  1. Delivering construction projects using innovative building technologies

    CSIR Research Space (South Africa)

    Ampofo-Anti, Naalamkai

    2017-07-01

    Full Text Available . Figure 1: IBT delivery flowchart Proceedings 11th Built Environment Conference 6 th August – 8 th August 2017 Delivering construction projects using innovative building technologies Durban, South Africa 5. REFERENCES Ampofo-Anti, N...

  2. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

  3. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  4. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  5. Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia

    Directory of Open Access Journals (Sweden)

    Jian Li

    2014-08-01

    Full Text Available Building Information Modelling (BIM is a process involving the creation and management of objective data with property, unique identity and relationship. In the Architecture, Engineering and Construction (AEC industry, BIM is adopted a lot in the lifecycle of buildings because of the high integration of information that it enables. Four-dimensional (4D computer-aided design (CAD has been adopted for many years to improve the construction planning process. BIM is adopted throughout buildings' lifecycles, in design, construction and operation. This paper presents five large-scale public and financial projects that adopt BIM in the design, construction and operational phases. Different uses of BIM are compared and contrasted in the context of the separate backgrounds. It is concluded that productivity is improved where BIM is used to enable easy sharing and integration of information and convenient collaboration.

  6. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    Science.gov (United States)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  7. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  8. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  9. Challenges of the expansive use of Building Information Modeling (BIM in construction projects

    Directory of Open Access Journals (Sweden)

    Hannele Kerosuo

    2015-06-01

    Full Text Available Building information modeling (BIM is an emerging modeling technology which challenges existing work procedures and practices in the construction industry. In this article we study the challenges, problems and potential expansions of BIM as a tool in the design, construction and operation of buildings. For this purpose the interfaces between different parties are examined in Finnish construction projects. The methodological approach of the study is cultural-historical activity theory, according to which a new artifact becomes a mediating instrument when the participatory subjects reconfigure the entire activity. The implementation of BIM is now spreading from the design activity to other phases of the construction projects, but its use is still limited in the projects' other three interfaces. BIM is an evolving set of software developed for various purposes which is locally 'combined' to fit the circumstances and capabilities of the stakeholders of the construction process.

  10. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    OpenAIRE

    Gurmu, Argaw Tarekegn; Aibinu, Ajibade Ayodeji; Chan, Toong Khuan

    2016-01-01

    This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry...

  11. A Novel Evaluation Method for Building Construction Project Based on Integrated Information Entropy with Reliability Theory

    Directory of Open Access Journals (Sweden)

    Xiao-ping Bai

    2013-01-01

    Full Text Available Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  12. A novel evaluation method for building construction project based on integrated information entropy with reliability theory.

    Science.gov (United States)

    Bai, Xiao-ping; Zhang, Xi-wei

    2013-01-01

    Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  13. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    Directory of Open Access Journals (Sweden)

    Argaw Tarekegn Gurmu

    2016-09-01

    Full Text Available This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.

  14. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  15. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  16. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures

  17. Building defects in Danish construction: project characteristics influencing the occurrence of defects at handover

    DEFF Research Database (Denmark)

    Schultz, Casper Siebken; Jørgensen, Kirsten; Bonke, Sten

    2015-01-01

    Defects in construction have gained much attention from both the public and academia. Danish construction is no exception and a number of political initiatives have been established to address the unsatisfying amounts of defects. One of the political initiatives, benchmarking, collects and provides...... those with many and/or serious defects. The article reviews the results from studying two quantitative data sets: (I) benchmarking data from 329 building projects and 621 contracts and (II) questionnaire data from an electronic survey comprising 130 contractors. This study provides in-depth knowledge...

  18. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  19. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  20. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  1. Review: Barr, Michael and Zlatko Skrbiš (2008, Constructing Singapore. Elitism, Ethnicity and the Nation-Building Project

    Directory of Open Access Journals (Sweden)

    Boris Michel

    2009-01-01

    Full Text Available Review of the monograph: Barr, Michael and Zlatko Skrbiš, Constructing Singapore. Elitism, Ethnicity and the Nation-Building Project, Copenhagen: NIAS Press, 2008, ISBN 978-87-7694-029-4, 304 pages

  2. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  3. Project-Based Market Competition and Policy Implications for Sustainable Developments in Building and Construction Sectors

    Directory of Open Access Journals (Sweden)

    Min-Ren Yan

    2015-11-01

    Full Text Available Building and construction sectors are significant contributors to the global economy, but their energy consumption necessitates greater commitment to sustainable developments. There is therefore a growing demand for green innovation in the form of cleaner production and policies to meet the modern requirements of sustainability. However, the nature in which public work is undertaken is in an environment of project-based market competition, whereby contractors routinely bid for contracts under specific project awarding systems, and variations are accompanied with the unique scope of individual projects before the final goods or services are delivered. A comprehensive understanding of the characteristics and contractors’ behavior in systems could help to identify the leverage points of policies. This paper proposes a system dynamics model, with quantitative analysis and simulations, to demonstrate the problems of a system with different project awarding systems and ineffective market performance. The framework of market efficiency and performance measures has been proposed to evaluate the project-based competition mechanism. Managerial policy implications for market efficiency and sustainable developments can thus be systematically discussed and compared through iterative computer simulations and scenario analysis.

  4. VERTICAL PROJECTION EFFICIENCY OF PIVOT POINTS USING ELECTRONIC TACHEOMETER DURING CONSTRUCTION OF BUILDINGS AND STRUCTURES

    Directory of Open Access Journals (Sweden)

    M. S. Nesterenok

    2014-01-01

    Full Text Available The paper shows that functional limitation of zenith devices and introduction of modern high-accuracy electronic tacheometers should lead to substitution of the mentioned devices for tacheometers in geodesic works concerning vertical projection of pivot points of the constructed buildings and structures. However the electronic tacheometer has not been considered in the function of a zenith device in ТКП 45-1.03-26-2006.Special experiemnts and practical works executed by UE “Geokart” has proved that in accordance with its design the electronic tacheometer equipped with a compensator for small inclinations and zenith prism attachment for ocular can be applied as a vertical projection device while setting sighting line of a telescope in a fixed vertical position. Corresponding experiments have been carried out for multi-storied building of business centre located in the M. Tank Street in Minsk in order to obtain comparative characteristics of vertical projection accuracy with the help of tacheometer TOPCON GPT 7501 and zenith device PZL-100. An initial point of the staked grid has been situated at the elevation ±0,0 м, standard graph elevation has been equal to +49,5 м (concrete slab of the 14th floor, projection height referred to the device has been equal to Н = 47,8 м. Both devices have been set on the same stand using a purpose made adaptive device in order to exclude centering errors. Deviation in position of final projection points on the standard graph which were obtained with the help of two devices has been equal to 1.2 mm, that testifies practical equal accuracy of the zenith device and tacheometer for vertical projection function.Additional advantage of the electronic tacheometer in comparison with special vertical projection devi ces lies in the fact that in the case of a certain misalignment of geodesic openings in intermediate floors ta- cheometer deviating from the vertical makes it possible to carry out initial point

  5. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  6. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  7. The latest application of Hitachi's state-of-the-art construction technology and further evolution towards new build NPP projects

    International Nuclear Information System (INIS)

    Akagi, K.; Morita, K.; Miyahara, R.; Murayama, K.; Deir, C.; Akahori, S.

    2008-01-01

    Shika Nuclear Power Station Unit No.2 began commercial operation in March 2006 as one of the latest new-build projects in the world. Hitachi-GE Nuclear Energy Ltd. (Hitachi) was the main contractor and supplied the entire plant including engineering, manufacturing of all major reactor and turbine-generator components, and executed the installation and commissioning. Hitachi completed the project on schedule and on budget owing in large part to its highly reliable advanced construction technology. This article describes Hitachi's unsurpassed advanced construction technology being applied to the current new-build projects in Japan. Furthermore, this article addresses a possible form of applications to new build nuclear power plants in North America. (author)

  8. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  9. Analisis Kecelakaan Kerja Pada Proyek Bangunan Gedung (Analysis of Work Accident on Building Construction Projects)

    OpenAIRE

    Ferdiansyah, Deni; Winarno, Setya; M, Faisol A

    2009-01-01

    Work accidents and fatalities often happen in construction industry, thus a study on this matter to promote safety management needs a thorough analysis of their elements. The purpose of this paper is to identify various types of accidents, cost of accident and insurance premium, and also the correlation between the types of accidents and their costs. The data was collected from thirty construction projects around Daerah Istimewa Yogyakarta province and surrounding areas. These data included t...

  10. Major factors contributing to the construction waste generation in building projects of Iraq

    Directory of Open Access Journals (Sweden)

    Khaleel Tareq

    2018-01-01

    Full Text Available Due to the economic growth and improvement of the construction industry witnessed by most countries, there has become a crucial need for employing modern possibilities in the construction sector to build taller, longer and deeper structures. However, one aspect that heads forward with the same intensity is the generation of 100 million tons of construction waste every year. This generation has occurred due to several factors with different levels of importance. Hence, this study reveals 15 factors influencing construction waste generation and categorizes them into 3 groups, (materials management on site, (materials handling, transportation and storage and (site management and practices. A questionnaire survey of 100 respondents was distributed among different engineers to assess the construction waste factors. Results showed that damage of materials on site, double handling of materials and incompetent contractor’s technical staff were the most significant factors of each category with Relative Importance Indexes (RII of 0.866, 0.844 and 0.83, respectively. These findings will help the practitioners to reduce construction waste quantities in sites and improve waste management performance factors to control the construction waste problems.

  11. Development of Occupational Safety and Health Requirement Management System (OSHREMS Software Using Adobe Dreamweaver CS5 for Building Construction Project

    Directory of Open Access Journals (Sweden)

    Abas Nor Haslinda

    2017-01-01

    Full Text Available The construction industry sector is considered as being risky with frequent and high accident rate. According to Social Security Organization (SOCSO, the construction accidents has arisen from time to time. Construction Industry Development Board (CIDB has developed the Safety and Health Assessment System in Construction (SHASSIC for evaluating the performance of a contractor in construction project by setting out the safety and health management and practices, however the requirement checklist provided is not comprehensive. Therefore, this study aims to develop a software system for facilitating OSH in building construction project, namely OSH requirements management system (OSHREMS, using Adobe Dreamweaver CS5 and Sublime Text as PHP editor. The results from a preliminary study which was conducted through interviews showed that, the respondents were only implementing the basic requirements that comply with legislations, with the absence of appropriate and specific guideline in ensuring occupational safety and health (OSH at the workplace. The tool will be benefits for contractors and other parties to effectively manage the OSH requirements for their projects based on project details.

  12. Radioactive materials in construction projects

    International Nuclear Information System (INIS)

    Herrmann, Ralf; Ohlendorf, Frank; Kaltz, Andrea Christine

    2014-01-01

    Till 1990 residues often of the former uranium mining were partly used as building material for road construction, terrain compensation and house construction in Saxony. These recommendations for action are addressed to applicants, planners and building constructors in the engineering and construction sector. It provides information for planning, preliminary investigations, applications, construction supervision related to radiation protection measures and documentation of construction projects where radioactive materials are expected.

  13. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk

  14. Preliminary analysis of projected construction employment effects of building the defense waste processing facility at the Savannah River Plant

    International Nuclear Information System (INIS)

    Garey, R.B.; Blair, L.M.; Craig, R.L.; Stevenson, W.

    1981-09-01

    This study estimates the probable effects of constructing the DWPF on the surrounding labor markets. Analyses are based on data from the local and regional labor markets, information from experts on local construction activities, information on the labor requirements of the Vogtle Power Plant (two nuclear reactors) being built by Georgia Power Company in Burke County, Georgia, and an econometric model of the construction labor market, based on several surveys of workers building three Tennessee Valley Authority nuclear power plants. The results of this study are reported in three parts. In Part I, completed in May 1980, we describe the 1979 (base year) employment levels within the local and regional labor markets surrounding SRP, from which most DWPF construction workers are likely to be drawn. In Part II, completed in June 1980, we define the four local sources of construction employment that will compete for craftsmen when DWPF is built. Also in Part II, most of the projected impacts of the DWPF reference immobilization alternative (one of several alternatives that may be chosen) are reported. Several construction schedules and labor demand scenarios for the reference alternative are considered. In Part III, completed in January 1981, most of the estimated impacts of the DWPF alternative referred to as the staged process alternative are reported. Several construction schedules and labor demand scenarios for this alternative are considered

  15. Radioactive air emissions notice of construction for Canister Storage Building (revised sealing configuration for spent nuclear fuel) - Project W-379

    International Nuclear Information System (INIS)

    Kamberg, L.D.

    1998-01-01

    The purpose of this Notice of Construction (NOC) is to provide a rewritten NOC for obtaining regulatory approval for changes to the previous Canister Storage Building (CSB) NOCs (WDOH, 1996 and EPA, 1996) as were approved by the Washington State Department of Health (WDOH, 1996a) and US Environmental Protection Agency (EPA, 1996a). These changes are because of a revised sealing configuration of the multi-canister overpacks (MCOS) that are used to store the SNF. A flow schematic of the SNF Project is provided in Figure 1-1. A separate notification of startup will be provided apart from this NOC

  16. Streamlining Demand Fulfilment Chain in Construction Projects : The Case of a Pre Engineered Steel Building Manufacturer

    NARCIS (Netherlands)

    Roosmalen, K.; van Weele, A.; Ashayeri, J.

    2010-01-01

    Practical implications – The results of this paper clearly verify the need for mind change among Pre Engineered and Structural Steel Building firms operating in the Middle-East. Supply chain management methods should be used to improve competitiveness.

  17. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  18. Post-Tensioned Concrete Long-Span Slabs in Projects of Modern Building Construction

    Science.gov (United States)

    Szydlowski, Rafal; Labuzek, Barbara

    2017-10-01

    Nowadays, design of modern an architectural building structures requires the use of slender and free from numerous supports slabs. The most suitable solution for above requirements are the post-tensioned slabs with unbounded tendons. Slabs prestressed by unbounded tendons are successfully used worldwide for several decades. During that time many recommendations dealing with the forming of geometry and prestressing, dimensioning and erection technology were issued. During the recent years prestressed slabs characterized by span and slenderness substantially exceeding recommended limitations were designed and erected with success in Poland. During the slabs erection and in two years of their using, the deflection of three oversized slabs were monitoring. In spite of designed the slabs significantly larger and slenderer than the recommended maximum value of span and span to depth ratio, the deflection of the slabs is definitely far from the limit value. The paper shows the geometry, characteristic and deflection of erected slabs and conclusion. Description of a very large span slab (21.3m), that was designed regarded to the information obtained from the previous realisation, is presented in this paper.

  19. Bellanca building, Yellowknife : building envelope retrofit project

    Energy Technology Data Exchange (ETDEWEB)

    Rajewski, G. [A.D. Williams Engineering Inc., Edmonton, AB (Canada)

    2008-07-01

    The Bellanca building is a ten-story, commercial office building, located in Yellowknife, Northwest Territories. The owner was concerned about annual fuel consumption, relative to other buildings of similar size. Tenants reported cold drafts and some ice build-up had been reported in the past, on the exterior of the cladding. In addition, some water penetration had occurred during rainfall. This presentation provided background information on the Bellanca building and discussed a building envelope retrofit project. A.D. Williams was hired in late 2006 in order to provide an opinion on the present condition of the building envelope. This presentation described the site investigation and presented an interior and exterior review of the building. It also presented a thermographic survey in order to map thermal anomalies and establish trends. Following acceptance of the report on findings, one of five options was selected for further development. This included removal of existing cladding, exterior gypsum wallboard, fiberglass insulation and application of BASF Walltite CT foam, sheathing, rigid insulation, drainage plane and new cladding. The preliminary design was then presented. This paper also described the tender and award of the contract; construction phase; and substantial completion of the project. tabs, figs.

  20. Building Design & Construction - Sustainability

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-11-01

    Offers a brief history of green building; presents the results of a specially commissioned survey; and analyzes the chief trends, issues, and published research, based on interviews with dozens of experts and participants in green building.

  1. Occupational risk of building construction

    International Nuclear Information System (INIS)

    Aneziris, O.N.; Topali, E.; Papazoglou, I.A.

    2012-01-01

    This paper presents the quantification of occupational risk of a building construction project. Risk assessment is based on the Occupational Risk Model (ORCA) developed under the Workgroup Occupational Risk Model project (WORM), in the Netherlands, for quantifying occupational risk. This model assesses occupational risk of a worker, by taking into account his various tasks, activities and their hazards. Risk is evaluated for three types of consequences: recoverable injury, permanent injury and death. The occupational risk model is based on a set of 63 bowties, which assess risk owing to different hazards such as fall from ladder, scaffold, roofs, falling object, struck by moving vehicle, contact by moving parts, etc. ORCA calculates the risk profile of a building construction site, consisting of thirty-eight workers in different job positions, such as operators of excavators, loaders, compaction equipment, workers in excavation and framing phases, etc. All risk profiles of workers have been quantified and jobs have been ranked according to their risk. Workers installing timber formworks have the highest fatality risk (1.57×10 −3 /yr), followed by the workers installing reinforcement (1.52×10 −3 /yr).

  2. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  3. Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.

  4. Energy management at public-private partnerships. A reference model for energy efficient building construction projects; Energiemanagement bei Oeffentlich-Privaten Partnerschaften. Ein Referenzmodell fuer energieeffiziente Hochbauprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Heidel, Robin

    2013-04-01

    The enhancement of the energy efficiency reduces the life cycle costs of real estates, and is an important component in achieving global climate goals. In the construction and operation of public building constructions, the state has to assume the function of a role model. Due to the budgetary position of the public authority continuously in deficit, the alternative form of procurement public-private partnerships will become increasingly important. The author of the contribution under consideration reports on the design of building construction projects of public-private partnerships in order to guarantee an energy efficient operation. A reference model with process descriptions for the single phases of the project is developed. The author describes the possible benefit of this model by means of an application example.

  5. Collect, analyze and data base for building up the investment reports of Center for Nuclear Science and Technology construction project

    International Nuclear Information System (INIS)

    Pham Quang Minh; Tran Chi Thanh; Cao Dinh Thanh; Mai Dinh Trung; Hoang Sy Than; Nguyen Nhi Dien; Trinh Van Giap; Le Ba Thuan; Vu Tien Ha

    2014-01-01

    Following the Contract No.19/HD/NVCB dated July 10, 2013 signed by the President of Vietnam Atomic Energy Institute (VINATOM), an additional ministerial Project was approval by the Decision No. 526/QD-VNLNT dated July 8, 2013 by the VINATOM President in order to implement an important task for VINATOM. This project was implemented by the Institute for Nuclear Science and Technology (INST) in Hanoi as management organization and VINATOM as the owner of project results. Main objectives of this Project are to support national budget for implementing to collected the general report from previous projects which are relevant to CNEST and new research reactor, IAEA guidance documents, documents provided by ROSATOM in seminars in 2010, 2012 and 2013, report from expert visits of Ministry of Science and Technology and completed the general report about the construction project of CNEST. (author)

  6. Digital Handover of Data from Building Projects to Building Operation

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    pro-jects to building operation. This project started in 2004 with research and analyses fol-lowed by development of a proposal for client requirements and in 2005 a first test on a real construction project has been carried out. After revision of the requirements a second test will be started early...... and construction and on the other side in building opera-tion and facilities management. In Denmark the government has launched a development program called Digital Construction and one of the projects concerns specifying require-ments for building clients in relation to digital handover of data from construction...... by a consortium called DACaPo consisting of a building client/facilities manager, a consulting company, a contractor and a university institute. This paper presents some of the results from the project with the main focus on the initial research....

  7. Collapse simulation of building constructions

    Directory of Open Access Journals (Sweden)

    Nekrest'yanov Viktor Nikolaevich

    Full Text Available The physical reasons for building structures destruction are both the forces arising at stress-strain state of construction elements and external influences arising at emergency situations, as well as their moments, impulses and periodic impulses with the frequencies close to of fluctuations frequencies of construction elements. We shall call the mathematical calculation models for the parameters-reasons of destructions the basic models. The basic models of destruction of building structures elements allow not only providing necessary level of reliability and survivability of the elements and the construction as a whole already at the stage of their design, but also giving the chance, at their corresponding completion, to provide rational decisions on the general need of recovery works and their volume depending on destruction level. Especially important for rational design decisions development, which ensure the demanded constructional safety of building structures, is library creation of the basic mathematical models of standard processes of bearing elements destructions for standard construction designs for the purpose of the further forecast (assessment of the level and probabilities of standard destructions. Some basic mathematical models of destructions processes of the standard elements of building structures are presented in the present article. A model of accounting for construction defects and a model of obtaining requirements to probabilities of partial destructions of a construction are given. Both of these models are probabilistic.

  8. Assessing students' sentiments towards the use of a Building Information Modelling (BIM) learning platform in a construction project management course

    Science.gov (United States)

    Suwal, Sunil; Singh, Vishal

    2018-07-01

    Building Information Modelling (BIM) tools and processes are increasingly adopted and implemented in the construction industry. Consequently, BIM education is considered increasingly important in Architecture, Engineering and Construction (AEC) education. While most of the research and literature on BIM education in engineering studies has focused on BIM implementation strategies, processes, benefits, and challenges, there is limited study on students' perception towards the implementation of BIM courses, or about online BIM learning platforms, or about the BIM tools themselves. Therefore, this paper takes the first steps towards addressing this gap. This study analyses students' (57 students) perception and sentiments towards the use of an online BIM learning platform and explores the potential implications of the findings for BIM education. The findings suggest that online BIM learning platforms are highly rated by students as a positive learning experience, indicating the need for greater integration of such tools and approaches in AEC courses.

  9. Building constructions: architecture and nature

    Directory of Open Access Journals (Sweden)

    Mayatskaya Irina

    2017-01-01

    Full Text Available The problem of optimization of building structures is considered in architectural bionic modeling on the bionic principle basis. It is possible to get a reliable and durable constructions by studying the structure and the laws of organization of natural objects. Modern architects have created unique buildings using the bionic approach. There are such properties as symmetry, asymmetry, self-similarity and fractality used in the modern architecture. Using the methods of fractal geometry in the design of architectural forms allows finding a variety of constructive solutions.

  10. Green Construction in Building Renovation

    Directory of Open Access Journals (Sweden)

    Ksit Barbara

    2016-06-01

    Full Text Available Modern materials and construction solutions draw more and more attention to ecology and building certification. Among the criteria appearing in revitalization, an important element is bringing plants back into heavily urbanized areas. In its natural form, this is not possible to carry out everywhere, often requiring large amounts of space. Nowadays, however, there are a number of green roofs and green wall systems, allowing “greener” construction without making significant changes in the urban environment.

  11. Automation in building and construction

    NARCIS (Netherlands)

    Gassel, van F.J.M.

    2010-01-01

    De komende 30 jaar zal naar verwachting de werkkracht in Nederland van 11 miljoen naar 10 miljoen mensen afnemen (van Bronswijk, 2010). Willen we dezelfde hoeveelheid taken blijven uitvoeren dan zuIlen we extra hulpmiddelen moeten inzetten. Automation in Building and Construction is het

  12. A profile of wood use in nonresidential building construction

    Science.gov (United States)

    H. N. Spelter; R. G. Anderson

    This report presents estimates of the amounts of lumber, glued-laminated lumber, trusses, plywood, particleboard, hardboard, and wood shingles used in new nonresidential building construction in the United States. Use of wood products is shown for several building types, project sizes, and building components. The estimates are based on a survey of 489 projects under...

  13. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  14. Development of Building Envelope Constructions

    DEFF Research Database (Denmark)

    Tommerup, Henrik Monefeldt; Munch-Andersen, Jørgen; Esbensen, Peter Kjær

    2000-01-01

    It is expected that the heat insulation demands in the Danish Building Regulations will be further increased around 2005, in order to reduce the heating demand and the CO2-emission. A simple increase of the insulation thickness of common wall types seems not to be attractive due to the increased...... effect of the 2-dimensional heat loss, the large wall thickness, and the costs of the wide foundation. Therefore, new types of walls have been developed. It is sought to minimise the total heat loss as well as the material consumption. The target was to come up with new walls for which the construction...

  15. Green Construction in Building Renovation

    Science.gov (United States)

    Ksit, Barbara; Majcherek, Michał

    2016-06-01

    Modern materials and construction solutions draw more and more attention to ecology and building certification. Among the criteria appearing in revitalization, an important element is bringing plants back into heavily urbanized areas. In its natural form, this is not possible to carry out everywhere, often requiring large amounts of space. Nowadays, however, there are a number of green roofs and green wall systems, allowing "greener" construction without making significant changes in the urban environment. The article includes a presentation and analysis of selected solutions of biological surfaces known as green roofs and green walls, specifying various solutions and their most important features. The case study focuses primarily on material and design solutions, as well as the potential benefits, risks and limitations in their use. Plants structures on the surfaces of vertical and horizontal partitions continue to be a very interesting alternative to take into account when applying for grants, such as LEED or BREEAM certificates.

  16. Method of constructing reactor buildings

    International Nuclear Information System (INIS)

    Hyuga, Takenori; Nagai, Fumio; Akutsu, Masayoshi.

    1985-01-01

    Purpose: To shorten the construction period for LMFBR type reactors, as well as smoothly introduce high pressure steams generated in concretes upon loss of coolant accidents to the outside of the system. Method: After disposing a liner plate as a chamber lining of reactor buildings, heat insulation materials having steam discharge channels at the outer surface are attached to the outside of the liner plate and, further, an organic films are disposed to the outside of the heat insulation materials. Then, concretes are spiked to the outside of the organic films using the liner plate and the heat insulation material as the mold for concretes. In this way, the construction period can be shortened by utilizing the liner plate and the heat insulation materials as the mold for concretes, as well as steams at high temperature resulted in the concretes upon loss of coolant accidents can smoothly be discharged to the outside of the system. (Moriyama, K.)

  17. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  18. Handbook of energy use for building construction

    Energy Technology Data Exchange (ETDEWEB)

    Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  19. Handbook of energy use for building construction

    Science.gov (United States)

    Stein, R. G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, railroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. Emphasis is given to new building construction; however, some information for the other parts of the construction industry is also included. Building designers are provided with information to determine the energy required for buildings construction and to evaluate the energy required for alternative materials, assemblies, and methods. It is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  20. Earth construction: traditional building techniques of Bhutan

    Directory of Open Access Journals (Sweden)

    João M. Guedes

    2018-01-01

    Full Text Available NCREP – Consultancy in Rehabilitation of Built Heritage Ltd., surveyed the constructive features of Bhutan's vernacular rammed earth built heritage, as part of a project financed by the World Bank and commissioned by the Division for the Conservation of Heritage Sites (DCHS of the Department of Culture - Ministry of Home and Cultural Affairs of Bhutan. This work, which aimed at better understanding the structural behaviour of this heritage and, based on this information, proposing measures to mitigate its seismic risk, included the study of 18 traditional rammed earth buildings in two villages in the Punakha district. The surveys were conducted house-to-house, based on a DCHS script, and included surveys of artisans responsible for building these constructive typologies, supported by a questionnaire integrated within the project, to collect information on the procedures, rites and practices followed in these constructions. This article focuses only on the first part of the work; it presents the main constructive characteristics assessed from the survey carried out on this built heritage and compiles the results of the surveys of the artisans.

  1. Management Of Building Projects

    OpenAIRE

    Niko Majdandzic; Tadija Lovric; Vido Peric

    2006-01-01

    In this work we have shown the concept of logistic support in management in building production and in building of objects, which is realised in Enterprise resource Planning – ERP system ERPINSG, developed in Informatic firm Informatic engineering – ININ in Slavonski Brod, and in cooperation with scientists of catedra for informatics of Faculty of Mechanical Engineering and users from building firms.

  2. Building the feedback system of project experience,and expediting the scientific development of nuclear power construction

    International Nuclear Information System (INIS)

    Zhou Hai

    2009-01-01

    In accord with the status of the energy structure and electric power demand in China, the Chinese government has made the strategy of developing nuclear power actively. Confronting the good chance for nuclear power development, the writer takes the Fangjiashan nuclear power project as an example, puts forward a viewpoint that establishing the nuclear power project experience summarization and feedback system is an urgent need for expediting the scientific development of nuclear power. It also demonstrates the necessity, feasibility, and detailed measures, etc. (authors)

  3. How clients influence building projects - a comparison of the construction industry and the petroleum industry in Norway

    OpenAIRE

    Evju, Mads; Mai, Nam Bao Nguyen

    2014-01-01

    Master's thesis in Industrial economics Several studies indicate the need for competence and quality improvement in the Norwegian construction industry. Findings show that diversity in client groups can lead to different levels of competence. This poses many challenges to the industry and those involved, all of which will be highlighted in this thesis. The objective of this thesis is to provide an understanding of how clients’ levels of competence and focus can influence the final resu...

  4. Introduction of Building Information Modeling (BIM) Technologies in Construction

    Science.gov (United States)

    Milyutina, M. A.

    2018-05-01

    The issues of introduction of building information modeling (BIM) in construction industry are considered in this work. The advantages of this approach and perspectives of the transition to new design technologies, construction process management, and operation in the near future are stated. The importance of development of pilot projects that should identify the ways and means of verification of the regulatory and technical base, as well as economic indicators in the transition to Building Information Technologies in the construction, is noted.

  5. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  6. Research Progress of Building Materials Used in Construction Land

    Science.gov (United States)

    Niu, Yan

    2018-01-01

    Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.

  7. Improving Building Performance through Integrating Constructability in the Design Process

    OpenAIRE

    Ezzat Othman, Ayman Ahmed

    2011-01-01

    The traditional procurment approaches commonly adopted in construction projects and the involvement of multitude of various project participants with diverse objectives, skills and interests tended to separate design from construction.This separation obstructs contractors from providing designers with construction feedback and suggestions for design improvement, which ultimately hampers the improvement of building performance. Because of the importance of the design phase and the vit...

  8. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  9. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  10. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  11. Green Building and School Construction.

    Science.gov (United States)

    DiNola, Ralph; Guerra, Jerry

    2002-01-01

    Discusses the benefits of green, or high-performance, buildings, such as health and comfort, cost effectiveness, and sustainability. Explores the barriers to their use by schools--most notably cost. Offers suggestions on overcoming these barriers. (EV)

  12. Building information models for astronomy projects

    Science.gov (United States)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  13. Transformation of Malaysian Construction Industry with Building Information Modelling (BIM

    Directory of Open Access Journals (Sweden)

    Latiffi Aryani Ahmad

    2016-01-01

    Full Text Available Building Information Modelling (BIM is a revolution of technology and a process that transformed the way building is planned, designed, analysed, constructed and managed. The revolution of technology and process could increase the quality of construction projects. The knowledge of BIM has been expanding in many countries including Malaysia. Since its inception, the use of BIM has broadened up widely with different purposes. The aims of this paper is to investigate the BIM implementation and uses in Malaysian construction projects. The methodologies adopted for structuring this paper are by using literature review and semi-structured interview with construction players that have experienced and being involved in projects using BIM. The purpose of literature review is to illustrate on the pervious research on the subject matter. Meanwhile, the purpose of interviews is to explore the involvement of construction players, years of experience in projects using BIM and BIM uses in construction projects. The findings revealed that BIM has been implemented in Malaysia since 2007 by various construction players, which are client, architect, C&S engineer, M&E engineer, QS, contractor, facilities manager and BIM consultant. The findings also revealed that BIM is used for project’ visualisation, improving project design, detecting design clashes, quantity take off and operation and maintenance. Further work will be focused on the current practices of construction players in projects using BIM.

  14. PERCEPTION OF BUILDING CONSTRUCTION WORKERS TOWARDS SAFETY, HEALTH AND ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    C.R. CHE HASSAN

    2007-12-01

    Full Text Available The construction industry is known as one of the most hazardous activities. Therefore, safety on the job site is an important aspect with respect to the overall safety in construction. This paper assesses the safety level perception of the construction building workers towards safety, health and environment on a construction job site in Kuala Lumpur, Malaysia. The above study was carried out by choosing 5 selected large building construction projects and 5 small building construction projects respectively in and around Kuala Lumpur area. In the present study, an exhaustive survey was carried out in these 10 project site areas using a standard checklist and a detailed developed questionnaire. The checklist comprised 17 divisions of safety measurements which are considered and perceived to be important from the safety point of view and was assessed based on the score obtained. The questionnaire comprised the general information with 36 safety attitude statements on a 1-5 Likert scale which was distributed to 100 construction workers. The results of the checklist show the difference of safety levels between the large and small projects. The study revealed that the large projects shown a high and consistent level in safety while the small projects shown a low and varied safety levels. The relationship between the factors can be obtained from the questionnaire. They are organizational commitment, factor influencing communication among workmates, worker related factors, personal role and supervisors’ role factors, obstacles to safety and safe behavior factors and management commitment at all levels in line with the management structure and risk taking behavioral factors. The findings of the present study revealed invaluable indications to the construction managers especially in improving the construction workers’ attitude towards safety, health and environment and hence good safety culture in the building construction industries.

  15. Potential and Benefits of Building Information Modeling (BIM) During Pre-Construction, Construction and Post Construction Stage

    OpenAIRE

    Aw Nien Wei; Md Azree Othuman Mydin

    2017-01-01

    The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology current...

  16. Key performance indicators for project success on innovative building technology projects

    CSIR Research Space (South Africa)

    Mphahlele, Cathy

    2015-12-01

    Full Text Available unconventional building methods can only be deemed to satisfy by way of rational design or Agrèment certification”. Delivering projects through IBTs has introduced a construction environment that has different procurement, supply chain management, building...

  17. REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6

    OpenAIRE

    Piyush Pramod Bagade* & Prof. Abhijit Bhirud

    2018-01-01

    Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...

  18. Solar building construction. Town planning - construction planning. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schempp, D.; Krampen, M.; Moellring, F.

    1994-01-01

    The book discusses the problems of solar energy use under the following aspects: Town planing; Typology of green solar architecture; Typologie of solar architecture; Vegetation in green solar architecture; Planning and simulation; Building materials; Ventilation, illumination; Research projects. (HW) [de

  19. Implementation of project based learning on the Prakerin subject of vocational high school students of the building engineering to enhance employment skill readiness of graduates in the construction services field

    Science.gov (United States)

    Sugandi, Machmud

    2017-09-01

    Implementation of the Prakerin subject in the field of Building Engineering study program in vocational high school (VHS) are facing many issues associated to non-compliance unit of work in the industry and the expected competencies in learning at school. Project Based Learning (PBL) is an appropriate model learning used for Prakerin subject to increase student competence as the extension of the Prakerin implementation in the construction industry services. Assignments based on the selected project during their practical industry work were given to be completed by student. VHS students in particular field of Building Engineering study program who has been completed Prakerin subject will have a better job readiness, and therefore they will have an understanding on the knowledge, skills, and attitudes and good vision on the construction project in accordance with their experience during Prakerin work in the industry.

  20. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  1. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  2. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  3. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  4. AP1000 shield building: a constructability challenge

    International Nuclear Information System (INIS)

    Di Giuseppe, Giovanni; Bonanno, Domenico

    2010-01-01

    The AP1000 Shield Building, an enhanced structure which surrounds the containment vessel, consists of standard Reinforced Concrete (RC) and composite Steel and Concrete (SC) construction. In the SC module the surface steel plates, (with attached shear studs and angles) filled with concrete, act as the steel reinforcement in concrete. This is a relatively new design technology that required the appropriate use of structural codes, supplemented with information from applicable tests on similar composite steel and concrete construction. Being a newer design concept, existing codes do not provide explicit guidance on SC construction so a review of literature and test data on composite structures similar to AP1000 shield building was done in order to confirm the technical basis for the design. The SC walls, air inlet structure and roof of the Shield Building will be constructed using modular construction practices and then transported to site and lifted into place. These modules, working also as permanent form-work, will be filled with high strength Self- Consolidating Concrete. (SCC) This paper provides a focused and integrated presentation of the enhanced shield building design methodology, testing, constructability and inspection. (authors)

  5. Potential and Benefits of Building Information Modeling (BIM During Pre-Construction, Construction and Post Construction Stage

    Directory of Open Access Journals (Sweden)

    Aw Nien Wei

    2017-11-01

    Full Text Available The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology currently used in the construction industry is the AutoCAD (Automatic computeraided design. AutoCAD is a commercial software application for 2D and 3D computer-aided design (CAD and drafting develop by Autodesk. Generally, all the drawing design from Autocad will be exchanged among the stakeholder in the form of paper. Information exchanged among them mostly involves a lot of documents and drawings. This practice creates errors because of documents and drawings are mostly in a paper-based format that is not properly managed which results in miscommunication among them. Having wrong information in the construction process could hinder the productivity of projects because in a construction project information is one of the important construction materials. Building Information Modeling (BIM is one of the newly software in the architecture, engineering, and construction (AEC industries to ensure all parties receive the right information. BIM technology is also an intelligent model of a building constructed digitally in the way of 3D. The software will generate model containing the information needed to support the construction, fabrication, and procurement activities that needed to realize the building. This paper will discuss on potential and benefits of BIM during pre-construction stage, construction stage and during post construction stage

  6. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria.

  7. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria. 

  8. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  9. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  10. Knowledge transfer from building operation to construction

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Chatzilazarou, Stamatia

    2017-01-01

    Purpose: To investigate how knowledge that derives from operation and maintenance of buildings can be stored and transferred in order to be reused in a future building project? Design/methodology/approach: The paper is theoretically based on knowledge management with a particular focus...... on interdepartmental knowledge transfer between departments responsible for operation and management and departments responsible for building projects in organisations with large and fast changing building portfolios. The paper includes a case study of the FM organisation of the Technical University of Denmark...... with data collection mainly by interviews with managers and staff in the relevant departments in this organisation. Findings: The case organisation seems to be aware of the importance of sharing and transferring their organisational knowledge. Over the last five years, the organisation has developed...

  11. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  12. Constructive use of holographic projections

    International Nuclear Information System (INIS)

    Schroer, Bert

    2008-01-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  13. Constructive use of holographic projections

    Energy Technology Data Exchange (ETDEWEB)

    Schroer, Bert [Centro Brasileiro de Pesquisas Fisicas (CBPF), Rio de Janeiro, RJ (Brazil); Institut fuer Theoretische Physik der FU, Berlin (Germany)

    2008-07-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  14. Building the future of healthcare. Part III: managing the build. Hospital leaders are moving forward using specialized IT tools to help them manage today's complex new-construction projects.

    Science.gov (United States)

    Lawrence, Daphne

    2010-05-01

    Hospital leaders are increasing making use of project management information systems (PMIS), which are built around documentation and communication of project-specific information. PMIS solutions are being applied to the daunting challenge of managing the large volumes of information involved in new construction projects. Project management tools usually utilize a portal. These tools can interface with administrative systems for best effect. CIOs and other senior executives emphasize that good leadership and execution are fundamental to success, and that automated project management tools are supports, not substitutes for good strategic planning and execution.

  15. Handling construction waste of building demolition

    Directory of Open Access Journals (Sweden)

    Vondráčková Terezie

    2018-01-01

    Full Text Available Some building defects lead to their demolition. What about construction and demolition waste? According to the Waste Act 185/2001 Coll. and its amendment 223/2015 Coll., which comes into force on January 1, 2017, the production of waste has to be reduced because, as already stated in the amendment to Act No. 229/2014 Coll., the ban on landfilling of waste will apply from 2024 onwards. The main goals of waste management can thus be considered: Preventing or minimizing waste; Waste handling to be used as a secondary raw material - recycling, composting, combustion and the remaining waste to be dumped. Company AZS 98 s. r. o. was established, among other activities, also for the purpose of recycling construction and demolition waste. It operates 12 recycling centers throughout the Czech Republic and therefore we have selected it for a demonstration of the handling of construction and demolition waste in addressing the defects of the buildings.

  16. DEVELOPMENT OF ESTIMATION METHODS OF ORGANIZATIONAL AND TECHNOLOGICAL RELIABILITY LEVEL OF BUILDINGS AND STRUCTURES IN PROJECTS OF BIOPHER-SUPPORTING CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    CHERNYSHEV D. О.

    2017-03-01

    Full Text Available Summary. The article is devoted to the search of advanced analytical tools and methodical-algorithmic techniques of organizational and technological and stochastic evaluation, risks and threats overcoming during the implementation of biosphere construction projects. The application expediency of theory and methods of wavelet analysis in the study of non-stationary stochastic oscillations of complex spatial structures is substantiated due to the need for more accurate prediction of their dynamic behavior and identification of the structures characteristics in the frequency-time space.

  17. Y-12 Sustainable Design Principles for Building Design and Construction

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, J. G.

    2008-11-01

    B&W Y-12 is committed to modernizing the Y-12 complex to meet future needs with a sustainable and responsive infrastructure and to integrating sustainability principles and practices into Y-12 work (Y72-001, B&W Y-12 Environmental, Safety and Health Policy). This commitment to sustainability and specifically sustainable design of buildings is also incorporated into Presidential Executive Orders (EO), DOE Orders (DOE O), and goals. Sustainable building design is an approach to design, construct, and operate facilities in an efficient and environmentally sound manner that will produce a healthful, resource-efficient and productive working environment that is inherently protective of the environment. The DOE has established the following 5 Guiding Principles for High Performance Sustainable Building (HPSB), and has issued directives that require Y-12 to incorporate the principles and a number of supporting specific practices and techniques into building design, construction and renovation projects: (1) Employ Integrated Design Principles; (2) Optimize Energy Performance; (3) Protect and Conserve Water; (4) Enhance Indoor Environmental Quality; and (5) Reduce Environmental Impact of Materials. The purpose of this document is to present the required sustainable building principles, practices and techniques, summarize the key drivers for incorporating them into Y-12 projects, and present additional recommendations and resources that can be used to support sustainable buildings to enhance the environmental and economic performance of the Y-12 Complex.

  18. Integrated sustainable urban infrastructures in building projects

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Quitzau, Maj-Britt; Elle, Morten

    2007-01-01

    Current strategies in urban planning and development merely promote standardized building solutions, while failing to prioritize innovative approaches of integration between building projects and sustainable urban infrastructures. As a result of this, urban infrastructures – the urban veins...... – are outdated from a sustainability perspective. This paper looks into more holistic ways of approaching building projects and discuss whether this provide a basis for an increased integration of urban infrastructures within building projects. In our study, we especially emphasise how conventional ways...... of approaching building projects are influenced by lock-in of existing infrastructural systems and compare this with two examples of more holistic ways of approaching building projects, developed by two architecture firms. The paper points out that such holistic perspective in building projects provide...

  19. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  20. Construction of a Solid State Research Facility, Building 3150

    International Nuclear Information System (INIS)

    1993-07-01

    The Department of Energy (DOE) proposes to construct a new facility to house the Materials Synthesis Group (MSG) and the Semiconductor Physics Group (SPG) of the Solid State Division, Oak Ridge National Laboratory (ORNL). The location of the proposed action is Roane County, Tennessee. MSG is involved in the study of crystal growth and the preparation and characterization of advanced materials, such as high-temperature superconductors, while SPG is involved in semiconductor physics research. All MSG and a major pardon of SPG research activities are now conducted in Building 2000, a deteriorating structure constructed in the 1940. The physical deterioration of the roof; the heating, ventilation, and air conditioning (HVAC) system; and the plumbing make this building inadequate for supporting research activities. The proposed project is needed to provide laboratory and office space for MSG and SPG and to ensure that research activities can continue without interruption due to deficiencies in the building and its associated utility systems

  1. Nuclear new build: Financing and project management

    International Nuclear Information System (INIS)

    Keppler, Jan Horst; Cometto, Marco

    2015-01-01

    As there are more nuclear power reactors under construction today than at any time in history, the authors present in a first part an economic and financial analysis comparing the respective exposure of gas-fired and nuclear power generation to electricity price uncertainty and examine the option of leaving the market in the case of a permanent fall in electricity prices. In a second part, the study more specifically addresses the financial risk associated with the development of a new nuclear project, taking into account not only uncertainty about the future evolution of prices but also about the cost of construction and operations, as well as the implications of different ratios of fixed cost to variable cost for bondholders and equity investors. The authors then address the issue of the management of new build projects and their supply chains, as the nuclear industry is undergoing a number of important developments with massive and discontinuous technological changes that are underway as generation II nuclear power plants (NPPs) are substituted by larger and more complex generation III/III+ plants. The loss of skill and human capital as engineers of the nuclear building boom of the 1970's and 1980's retire must also be factored in, as well as the reconfiguration of the global supply chain, which is driven both by new possibilities in data management, externalisation and logistics, and a secular shift of activity from the United States, Japan, Europe and Korea to China, Southeast Asia and the Middle East

  2. Project materials [Commercial High Performance Buildings Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-01-01

    The Consortium for High Performance Buildings (ChiPB) is an outgrowth of DOE'S Commercial Whole Buildings Roadmapping initiatives. It is a team-driven public/private partnership that seeks to enable and demonstrate the benefit of buildings that are designed, built and operated to be energy efficient, environmentally sustainable, superior quality, and cost effective.

  3. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  4. The construction of a PWR power station reactor building liner

    International Nuclear Information System (INIS)

    Skirving, N.; Goulding, J.S.; Gibson, J.A.

    1991-01-01

    Cleveland Bridge and Engineering Co Ltd (CBE) are constructing the Reactor Building Liner Plate containment of the Sizewell 'B' Power Station for Nuclear Electric Ltd. This has entailed extensive offsite prefabrication of components and their subsequent erection at Sizewell. It has been necessary to engineer temporary supporting mechanisms to enable manufacture and erection to proceed, yet also to withstand wet concrete forces during the progressive construction. The Reactor Building Liner Plate is a safety related system and as such, in addition to strict compliance with the ASME code, the Quality Assurance (QA) requirements of BS 5882 are applicable. A dedicated Project Team was established by CBE to control and direct the work. Equally important as satisfying the rigorous Q.A. requirements has been the need to meet programme and budget. This paper details CBE execution of the Project. (author)

  5. The application of micro UAV in construction project

    Science.gov (United States)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  6. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    K. Kolesnikova

    2017-06-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  7. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    Katerina Kolesikova

    2017-05-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  8. Communication of Ergonomics in building and construction.

    Science.gov (United States)

    Wiberg, Viveca

    2012-01-01

    For the coming years SWEA is planning for communication and information actions. One of the sectors concerned is the building and construction industry. Focus of the information is to avoid accidents and injuries, and how companies by themselves can prevent risks. The objective of the information is to increase awareness among all stakeholders in order to secure that they are willing and able to reduce risks for workers. At the conference two brochures will be presented. They are designed to provide information and knowledge about specific risks of occupational accidents and occupational diseases which occur frequently during construction work and how they can be prevented. They are directed to all those who are involved in the construction process at different stages and who are subject to SWEAs rules and regulations. New identified risk groups are e.g. students, apprentices, self-employed, and foreign workers temporarily working in Sweden. We also see that work is still being carried out in narrow installation spaces during erection stage of buildings because the people responsible for the drawings do not take notice of the need for sufficient space to do the work. SWEA experienced that it is difficult to reach all the groups concerned with the message about how to avoid injuries and unnecessary musculoskeletal disorders.

  9. IMPROVING TRADITIONAL BUILDING REPAIR CONSTRUCTION QUALITY USING HISTORIC BUILDING INFORMATION MODELING CONCEPT

    Directory of Open Access Journals (Sweden)

    T. C. Wu

    2013-07-01

    Full Text Available In addition to the repair construction project following the repair principles contemplated by heritage experts, the construction process should be recorded and measured at any time for monitoring to ensure the quality of repair. The conventional construction record methods mostly depend on the localized shooting of 2D digital images coupled with text and table for illustration to achieve the purpose of monitoring. Such methods cannot fully and comprehensively record the 3D spatial relationships in the real world. Therefore, the construction records of traditional buildings are very important but cannot function due to technical limitations. This study applied the 3D laser scanning technology to establish a 3D point cloud model for the repair construction of historical buildings. It also broke down the detailed components of the 3D point cloud model by using the concept of the historic building information modeling, and established the 3D models of various components and their attribute data in the 3DGIS platform database. In the construction process, according to the time of completion of each stage as developed on the construction project, this study conducted the 3D laser scanning and database establishment for each stage, also applied 3DGIS spatial information and attribute information comparison and analysis to propose the analysis of differences in completion of various stages for improving the traditional building repair construction quality. This method helps to improve the quality of repair construction work of tangible cultural assets of the world. The established 3DGIS platform can be used as a power tool for subsequent management and maintenance.

  10. Evaluation of Building Projects Using Earned Value Technique ...

    African Journals Online (AJOL)

    This study evaluates building construction projects using the Earned Value Analysis technique, the Experimental Approach, and Value Concept Analysis. The aim was to compare the cost incurred for an identified amount of work done on a project with the cost budgeted for the same work. The results were used to calculate ...

  11. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  12. BARRIERS AND CHALLENGES OF BUILDING INFORMATION MODELLING IMPLEMENTATION IN JORDANIAN CONSTRUCTION INDUSTRY

    OpenAIRE

    Mohammed A.KA. AL-Btoush*, Ahmad Tarmizi Haron

    2017-01-01

    Construction companies are faced with the need to innovatively integrate the construction process and address project development challenges. One way of doing that is the integration of building information modelling (BIM) in the building design and development cycles. However, due to the lack of clear understanding and the absence of a holistic implementation guideline, many companies are unable to fully achieve BIM potentials or implement BIM in their project and building lifecycle. BIM imp...

  13. Sustainable construction - the standard for all public building?

    Energy Technology Data Exchange (ETDEWEB)

    Handyside, R. [Richard Handyside Construction Resources (United Kingdom)

    2002-01-01

    This article argues for the need for foresight and planning to achieve sustainable development in the construction of public buildings. Reasons why sustainable development fails are highlighted, and the key factors that go to make a development sustainable are listed and involve the choice and layout of the site, site services, the fitting of spaces to the required purpose, the arrangement of rooms to achieve maximum use of natural light, heat and air, and the choice of construction materials and finishes. The balancing of short and long-term costs, and the use of life-cycle costs in every project are discussed.

  14. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  15. Construction and building of a compact RFQ spiral structure for the stopping of highly charged heavy ion beams for the HITRAP project of the GSI

    International Nuclear Information System (INIS)

    Hofmann, B.

    2007-01-01

    For experiments of the atomic-physics group of the GSI in Darmstadt an ion stopper is built, which will make low-energetic, extremely highly charged ions available. The plannings for the so-called HITRAP (highly charged ion's trap) began at the beginning of the ninetieth. With this facility highly-charged heavy ions shall be stopped in two stages to very low, thermal velocities, and be available for highly precise mass spectroscopy, measurements of the g factor of the bound electron of hydrogen-like ions, and other atomic-physics experiments. This decelerator facility shall first be built in the reinjection channel behind the ESR with the possibility, to apply all components later in teh extension of the GSI in the framework of the FAIR project in the facility for low-energetic antiprotons and ions to be newly built. the present thesis treats the development and the building of an integrated RFQ debuncher stopping accelerator, which represents a part of the HITRAP stopping structures. By this the ion beam is stopped from the IH stopping accelerator with an energy of 500 keV/u to 5 keV/u. By the integrated spiral buncher the beam can be fitted in energy and energy deviation to the subsequent cooler trap. In this thesis the foundations of the particle dynamics in a RFQ accelerator for the stopping of particle beams were worked out and realized, the particle-dynamics calculations necessary for the lay-out of such a structure performed with RFQSim, suitable RF structures with the simulation program Microwave Studio developed and studied, as well as the thermal load of the structures studied with the finite-element code ALGOR. A further, central topic of this thesis is the building and the tuning of the RFQ structure in order to reach a homogeneous as possible field distribution along the electrodes. Measurements of the fields in the RFQ were performed with a disturbing condenser, at the debuncher with a disturbing body. After successfully performed vacuum tests at the

  16. Design project SP-RA, Construction specifications of the sanitary corridor - SP building; Idejni projekat SP-RA, Gradjevinski opis sanitarnog propusnika - objekat

    Energy Technology Data Exchange (ETDEWEB)

    Bon, B [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1956-11-09

    According to the design task the sanitary corridor satisfies the needs of both RA reactor and HL (Hot laboratory) buildings. This building is located between RA and HL buildings and is connected to both by corridors 3,3 m wide. The access to the building is from the south, i.e. from the local road in the Vinca Institute. [Serbo-Croat] Prema projektnom zadatku sanitarni propusnik zadovoljava potrebe objekata RA i HL. Zgrada je situirana izmedju ova dva objekta. Sa objektima RA i HL vezana je komunikativnim hodnikom sirine 3,3 m. Prilaz zgradi je sa juzne strane, odnosno sa internog puta Instituta Vinca.

  17. Renovation versus New Construction and Building Decision Tool for Educational Facilities

    OpenAIRE

    Pope, Carrie; Marks, Eric; Back, Edward; Leopard, Tim; Love, Thomas

    2016-01-01

    Renovation of an existing building is an accomplished stem of the construction industry because it supplies financial diversification for construction stakeholders. Although several construction planning tools and stakeholder alignment exercises have been developed, no tool exists to assist project owners to decide between renovating an existing building and new construction with a comprehensive decision criteria. The objective of this research is to create and test a renovation versus new bu...

  18. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  19. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  20. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  1. New build CANDU in Canada - development and application of information management systems for latest construction technology

    International Nuclear Information System (INIS)

    Asakura, S.; Akane, N.; Byrne, J.; Canas, B.; Kereliuk, S.; Akahori, S.

    2007-01-01

    In the wake of recent events representing growing nuclear energy interest in Canada, AECL and Hitachi are sharing each other's expertise as each company has its own unique and unrivalled capability in managing new build construction projects. This paper addresses some of the key strategies used to execute successfully a New CANDU build project, by focusing on recent developments and implementations in the construction and project management fields and by highlighting the use of cutting edge information technology. These strategies are designed to achieve and maximize their benefit to the New Build CANDU project team, to AECL/Hitachi as well as customers, partners and suppliers. (author)

  2. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Scheib, J.; Pless, S.; Torcellini, P.

    2014-08-01

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy use requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.

  3. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  4. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  5. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  6. Wood: a construction material for tall buildings

    Science.gov (United States)

    Wimmers, Guido

    2017-12-01

    Wood has great potential as a building material, because it is strong and lightweight, environmentally friendly and can be used in prefabricated buildings. However, only changes in building codes will make wood competitive with steel and concrete.

  7. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  8. Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery

    Directory of Open Access Journals (Sweden)

    Sungmin Yun

    2017-06-01

    Full Text Available Despite the efforts for sustainability studies in building and infrastructure construction, the sustainability issues in industrial construction remain understudied. Further, few studies evaluate sustainability and benchmark sustainability issues in industrial construction from a management perspective. This study presents a phase-based benchmarking framework for evaluating sustainability practices use focusing on industrial facilities project. Based on the framework, this study quantifies and assesses sustainability practices use, and further sorts the results by project phase and major project characteristics, including project type, project nature, and project delivery method. The results show that sustainability practices were implemented higher in the construction and startup phases relative to other phases, with a very broad range. An assessment by project type and project nature showed significant differences in sustainability practices use, but no significant difference in practices use by project delivery method. This study contributes to providing a benchmarking method for sustainability practices in industrial facilities projects at the project phase level. This study also discusses and provides an application of phase-based benchmarking for sustainability in industrial construction.

  9. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  10. 27 CFR 19.271 - Construction of buildings

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Construction of buildings 19.271 Section 19.271 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU... Construction of buildings Buildings in which spirits, denatured spirits, articles, or wines are produced...

  11. Wood and Other Materials Used to Construct Nonresidential Buildings - Canada

    Science.gov (United States)

    David B. McKeever; Joe Elling

    2014-01-01

    Low-rise nonresidential building construction is an important market in Canada for lumber, engineered wood products, structural wood panels, and nonstructural wood panels. This report examines wood products consumption in 2012 for construction of selected low-rise nonresidential buildings types that have six or fewer stories. Buildings with more than six stories are...

  12. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  13. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    OpenAIRE

    Voytolovskiy Nikolay; Trebukhin Anatoliy; Shoshinov Vitaly

    2017-01-01

    This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment projec...

  14. Research projects and capacity building

    CSIR Research Space (South Africa)

    Breen, CM

    2004-10-01

    Full Text Available A World Bank long-term perspective study on Sub-Saharan Africa highlighted the need to build human and institutional capacity in virtually all sectors and countries. In South Africa, establishment of a democratic government in 1994 saw increased...

  15. Nuclear New Build: Insights into Financing and Project Management

    International Nuclear Information System (INIS)

    Horst Keppler, Jan; Cometto, Marco; Kim, Sang-Baik; Sozoniuk, Vladislav; Rothwell, Geoffrey; Thompson, Orme; Savage, Chris; Mancini, Mauro; Leigne, Philippe; Bickford, Erica; Crozat, Matt

    2015-01-01

    Nuclear new build has been progressing steadily since the year 2000, with the construction of 94 new reactors initiated and 56 completed reactors connected to the grid. Among these new reactors are some of the first generation III/III+ reactors of their kind. Drawing on a combination of conceptual analysis, expert opinion and seven in-depth case studies, this report provides policy makers and stakeholders with an overview of the principal challenges facing nuclear new build today, as well as ways to address and overcome them. It focuses on the most important challenges of building a new nuclear power plant, namely assembling the conditions necessary to successfully finance and manage highly complex construction processes and their supply chains. Different projects have chosen different paths, but they nonetheless share a number of features. Financing capital-intensive nuclear new build projects requires, for example, the long-term stabilisation of electricity prices whether through tariffs, power purchase agreements or contracts for difference. In construction, the global convergence of engineering codes and quality standards would also promote both competition and public confidence. In addition, change management, early supply chain planning and 'soft issues' such as leadership, team building and trust have emerged over and again as key factors in the new build construction process. This report looks at ongoing trends in these areas and possible ways forward. (authors)

  16. New Orleans Capacity Building Pilot Project

    Science.gov (United States)

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  17. Pattern of accidents in building construction sites in Obio Akpor ...

    African Journals Online (AJOL)

    Background: Building construction workers are engaged in a dangerous job, exposing them ... The leading cause building site accidents include falls from unsafe working ... Data collected in Excel spread sheet were analyzed and presented in ...

  18. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Science.gov (United States)

    Venkrbec, Vaclav; Bittnerova, Lucie

    2017-12-01

    Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  19. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  20. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  1. Value Triangles in the Management of Building Projects

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2013-01-01

    The purpose of this paper is to investigate value triangles and their implementation in the management of building projects. The paper is based on results from a research project on space strategies and building values, which included a major case study of the development of facilities for Danish...... Broadcasting Corporation (DR) over time. The conventional iron triangle of quality, cost and schedule for project management is the theoretical starting point, but this is seen as mainly being related to process integrity in the construction stage. It is supplemented by a similar value triangle of cultural...... value, use value and quality of realization for product integrity, mainly for the design stage. Based on this framework an evaluation is made of the value management in six of DR’s building projects from the first around 1930 to the most recent – the new headquarters DR Byen finalised in 2009...

  2. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  3. Digital building planning - digital construction; Digitale Gebaeudeplanung - digitales Bauen

    Energy Technology Data Exchange (ETDEWEB)

    Friedrichs, K. [Karlsruhe Univ. (T.H.) (Germany). Fakultaet fuer Architektur

    1995-12-31

    In chapter 3 of the anthology about building control the following aspects are discussed: digital building planning and digital construction, which are characterised by an increasing complexity of planning, buildings, construction technology and construction processes. In this respect the digital-technical scenarios, passive and active objects as well as digital construction are described. (BWI) [Deutsch] Kapitel 3 des Sammelbandes ueber Building Control ist den Themen Digitale Gebaeudeplanung und Digitales Bauen gewidmet, die durch die zunehmende Komplexitaet von Planung, Gebaeuden, Bautechnologien und -prozessen bedingt sind. In diesem Zusammenhang werden folgende Themen angesprochen: Digitale technische Szenarien, passive und aktive Objekte sowie digitales Bauen. (BWI)

  4. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    Directory of Open Access Journals (Sweden)

    Voytolovskiy Nikolay

    2017-01-01

    Full Text Available This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment project risks were specified on the basis of interconnection of risk and project effectiveness. Risk management procedure at realization of the developer project was developed.

  5. Vacuum Insulation Panels Applied in Building Constructions

    NARCIS (Netherlands)

    Tenpierik, M.J.

    2010-01-01

    Due to sustainability and due to international treaties, it is desired and required to reduce greenhouse gas emissions drastically. One contributor to these emissions is the burning of fossil fuels for generating power and electricity to be used in and for buildings. Buildings and building-related

  6. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  7. Biomass furnace: projection and construction

    Energy Technology Data Exchange (ETDEWEB)

    Melo, Fernanda Augusta de Oliveira; Silva, Juarez Sousa e; Silva, Denise de Freitas; Sampaio, Cristiane Pires; Nascimento Junior, Jose Henrique do [Universidade Federal de Vicosa (DEA/UFV), MG (Brazil). Dept. de Engenharia Agricola

    2008-07-01

    Of all the ways to convert biomass into thermal energy, direct combustion is the oldest. The thermal-chemical technologies of biomass conversion such as pyrolysis and gasification, are currently not the most important alternatives; combustion is responsible for 97% of the bio-energy produced in the world (Demirbas, 2003). For this work, a small furnace was designed and constructed to use biomass as its main source of fuel, and the combustion chamber was coupled with a helical transporter which linked to the secondary fuel reservoir to continually feed the combustion chamber with fine particles of agro-industrial residues. The design of the stove proved to be technically viable beginning with the balance of mass and energy for the air heating system. The proposed heat generator was easily constructed as it made use of simple and easily acquired materials, demanding no specialized labor. (author)

  8. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  9. Computer integrated construction at AB building in reprocessing plant

    International Nuclear Information System (INIS)

    Takami, Masahiro; Azuchi, Takehiro; Sekiguchi, Kenji

    1999-01-01

    JNFL (Japan Nuclear Fuel Limited) is now processing with construction of the spent nuclear fuel reprocessing plant at Rokkasho Village in Aomori Prefecture, which is coming near to the busiest period of construction. Now we are trying to complete the civil work of AB Building and KA Building in a very short construction term by applying CIC (Computer Integrated Construction) concept, in spite of its hard construction conditions, such as the massive and complicated building structure, interferences with M and E (Mechanical and Electrical) work, severe winter weather, remote site location, etc. The key technologies of CIC are three-dimensional CAD, information network, and prefabrication and mechanization of site work. (author)

  10. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  11. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  12. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  13. Project quality management critical success factors for buildings

    CERN Document Server

    Low, Sui Pheng

    2014-01-01

    The book presents the development of the Construction Quality Assessment System (CONQUAS), Singapore’s de facto quality performance measurement system, explains the application of the Quality Management System (QMS) to manage CONQUAS and identifies 33 critical success factors (CSFs) for achieving high CONQUAS scores. Through CONQUAS, the reader benefits from understanding how the Singapore government developed and implemented the first objective system for measuring what many building professionals have perceived to be elusive quality standards in the construction industry. The book presents both the theoretical concepts as well as the practical aspects to achieving strategic Project Quality Management that is anchored on the CSFs to building best practices. To realistically reflect the practical aspects and challenging issues faced by stakeholders in the construction industry, questionnaire surveys were conducted with building professionals to distinguish the importance level and extent of adoption of the ...

  14. Improving Productivity in Building Construction – by Repetitions in Products, Processes, and Organisations

    DEFF Research Database (Denmark)

    Bekdik, Baris

    This thesis builds on several studies with connection to the lack of productivity in build-ing construction. It seeks to enhance the conditions for improving productivity in the fragmented building construction industry, by exploring how a modular thinking of products, processes and organisations...... can be reapplied on new building construction projects. Complexity theory is used for diagnosis and modularity theory for the remedy towards the high degree of complexity, which is seen as the root of unproductivity. De-sign Research Methodology is followed to structure and organise the different...... from the practitioner’s perspective. In the second part of the exploratory study, examples of the fragmented kinds of modu-lar applications around the world are compiled in order to demonstrate the inconsistent use, but still universal appeal that the approach carries with respect to building construc-tion...

  15. FRAGMENTATION ISSUE IN MALAYSIAN INDUSTRIALISED BUILDING SYSTEM (IBS PROJECTS

    Directory of Open Access Journals (Sweden)

    MOHD NASRUN MOHD NAWI

    2014-02-01

    Full Text Available As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialised Building System (IBS, as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach. This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a number of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded.

  16. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  17. Three Construction Projects with Wood Scraps

    Science.gov (United States)

    Levine, Elizabeth

    1977-01-01

    Wood, a natural material, appeals to children of all ages. Wood construction allows children the flexibility of moving parts of their work around until they are satisfied with the arrangement. Three projects are described. (Author/RK)

  18. Commercial Buildings Partnerships - Overview of Higher education projects

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Robinson, Alastair [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Regnier, Cindy [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-02-01

    The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits are designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.

  19. 9 CFR 108.8 - Construction of buildings.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Construction of buildings. 108.8 Section 108.8 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF... LICENSED ESTABLISHMENTS § 108.8 Construction of buildings. (a) The floors, walls, ceilings, partitions...

  20. Industrial robots application in the construction of buildings and structures

    Directory of Open Access Journals (Sweden)

    Verzhbovskiy Gennady

    2017-01-01

    Full Text Available Proposals on the use of modernized industrial robots in the construction of low-rise buildings are formulated. The necessary parameters of such a mechanism are established. The time necessary for building the walls of a two-story house is determined. Features of the robots use on the construction site are described.

  1. IT-investigation in the building construction industry

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt

    1995-01-01

    An investigation of the level of computing in the Danish construction industry. A quantitative and qualitative level was stated among architects, engineers, building owners, contractors a.o. use of computing......An investigation of the level of computing in the Danish construction industry. A quantitative and qualitative level was stated among architects, engineers, building owners, contractors a.o. use of computing...

  2. 29 CFR 779.335 - Sales of building materials for residential or farm building construction.

    Science.gov (United States)

    2010-07-01

    ... materials for residential or farm building construction. Section 3(n) of the Act, as amended, excludes from... 29 Labor 3 2010-07-01 2010-07-01 false Sales of building materials for residential or farm building construction. 779.335 Section 779.335 Labor Regulations Relating to Labor (Continued) WAGE AND...

  3. Prototypical Rod Construction Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report

  4. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  5. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  6. 2nd International Conference on Construction and Building Research

    CERN Document Server

    Fernández-Plazaola, Igor; Hidalgo-Delgado, Francisco; Martínez-Valenzuela, María; Medina-Ramón, Francisco; Oliver-Faubel, Inmaculada; Rodríguez-Abad, Isabel; Salandin, Andrea; Sánchez-Grandia, Rafael; Tort-Ausina, Isabel; Construction and Building Research

    2014-01-01

    Many areas of knowledge converge in the building industry and therefore research in this field necessarily involves an interdisciplinary approach. Effective research requires strong relations between a broad variety of scientific and technological domains and more conventional construction or craft processes, while also considering advanced management processes, where all the main actors permanently interact. This publication takes an interdisciplinary approach grouping various studies on the building industry chosen from among the works presented for the 2nd International Conference on Construction and Building Research. The papers examine aspects of materials and building systems; construction technology; energy and sustainability; construction management; heritage, refurbishment and conservation. The information contained within these pages may be of interest to researchers and practitioners in construction and building activities from the academic sphere, as well as public and private sectors.

  7. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  8. Environmental and Energy Aspects of Construction Industry and Green Buildings

    Science.gov (United States)

    Kauskale, L.; Geipele, I.; Zeltins, N.; Lecis, I.

    2017-04-01

    Green building is an important component of sustainable real estate market development, and one of the reasons is that the construction industry consumes a high amount of resources. Energy consumption of construction industry results in greenhouse gas emissions, so green buildings, energy systems, building technologies and other aspects play an important role in sustainable development of real estate market, construction and environmental development. The aim of the research is to analyse environmental aspects of sustainable real estate market development, focusing on importance of green buildings at the industry level and related energy aspects. Literature review, historical, statistical data analysis and logical access methods have been used in the research. The conducted research resulted in high environmental rationale and importance of environment-friendly buildings, and there are many green building benefits during the building life cycle. Future research direction is environmental information process and its models.

  9. DEVELOPMENT OF THE STATE SUPPORT FORMS PROJECTS IN INDUSTRIAL BUILDING

    Directory of Open Access Journals (Sweden)

    I. M. Meilanov

    2016-01-01

    Full Text Available Aim. The topicality of the research is stipulated by the objective necessity of the organizational and economic mechanism improvement of the state support projects of the industrial building. The aim of the research is the development of conceptual provisions and methodological foundations of financial projects creating conditions for economic growth of Russia based on the construction and putting into effect industrial objects.Methods. In the course of the research the system, subject-functional and structural approaches were implemented to solve the problems set widening the scope of the complex approach to assessment of the current operating mechanism of the state financial support of the projects and financial volume; to criteria stipulation of the most effective projects contest selection: to the search of the investment resources accumulation instrument into industrial building.Results. It is stipulated that state investment policy in industrial building mechanism oriented to define rational investment volumes and their branch, reproductive, technological and territorial structure; option of the building branch development priority; increase of the investment projects efficiency realization. The dynamics of the state support in the form of subsidies and budget investments into creation of the industrial building objects is analytically summarized. It is determined that the peculiarity of the modern state support projects of industrial building is transition from budget allocations distribution between branches and regions to selective and partial financing of specific investment projects on competitive basis. Some tactics of state and private partnership attracting private capital without losing strategic state control under systems and objects are defined. As an effective form of the industrial building support projects it is proposed to use a concession model form: projecting - building- financing- ownership - exploitation

  10. Round table: The New Constructions; New Build; IAEA Services Nuclear Power Reactor Technologies Construction and Operation

    International Nuclear Information System (INIS)

    Choho, Tarik; Ward, Tony; Koshy, Thomas; )

    2014-01-01

    The first round-table of Atoms for the Future 2014 focused on the topic of 'The new construction'. Attendees had the opportunity to see Tarik Choho, Chief Commercial Executive Officer at AREVA, Tony Ward, Partner and Head of Power and Utilities at EY, as well as Thomas Koshy, Head of Nuclear Power technology Development Section at the IAEA, share their respective point of view and discuss together. They first started with their own presentation before sitting together at the discussion panel. Tarik Choho explained that there are many opportunities for new builds around the world, and especially in new comer countries. Thomas Koshy brought his expert point of view as an international regulator. He showed that the technology landscape also includes new designs as well as non-electricity generation uses. Those two aspects could bring both opportunities and challenges for licensing. Tony Ward showed how difficult it was to finance such a capitalistically intensive project as a new build, and how one could try to find an electricity retail price which is acceptable for both the general private consumer and the plant operator. All speakers agreed that preparation was core to a nuclear new build project. They also pointed out that every project involves more and more actors, and that it could be challenging to let everyone have the appropriate say

  11. Knowledge Management Practice on Construction Project ...

    African Journals Online (AJOL)

    Likewise, the results further indicated 19 benefits of KM practice for improving construction project performance and include: improve project quality, cost and time; practice and process improvement; encourage effective teamwork and innovation; improve the client satisfaction; boost productivity of employees and processes; ...

  12. Construction of Buildings on Peat: Case Studies and Lessons Learned

    Directory of Open Access Journals (Sweden)

    Mahmod Ali Abdul-Wadoud

    2016-01-01

    Full Text Available Building construction on soft soils including on peat has many challenges and difficulties. The failed and deteriorated buildings have a big impact on the community. The IConCEES International Workshop 2015 which was conducted on October 2015 convened as a joint venture between Universiti Tun Hussein Onn Malaysia (UTHM and the University College of Technology Sarawak (UCTS. The aim was to invite regional experts from academia and the industry to formally present and discuss the various construction problems encountered when working with peat. The discussions were divided into two divisions; infrastructure and building construction. This paper discusses the outcomes of the workshop and focuses on the factors and relevant challenges when constructing buildings on peat. The experts have discussed regulatory and construction issues including: drainage issues, site investigation practices, monitoring and construction guidelines. A few suggestions were outlined as a remedy to these problems and to better assist the peat practitioner at work.

  13. A Knotworking Guideline for Building Projects

    DEFF Research Database (Denmark)

    Rasmussen, Mai; Gade, Anne Nørkjær; Jensen, Rasmus Lund

    2017-01-01

    to collaborate occurs. The Finnish method, Knotworking AEC, emphasizes both collaboration and structure of building projects, which accommodates the lack of collaboration in the practices of the AEC sector. However, the recent development of Knotworking AEC implies a lack of written articles on Knotworking AEC...... experiments were analysed by practice theoretical methods. The result of this research is a Knotworking Guideline for Building Projects indicating both the phases, the participants and the tasks of each phase. The contribution of the resultlies in the conduction of a Knotworking session from both a practical...

  14. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  15. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  16. Reducing construction waste: A study of urban infrastructure projects.

    Science.gov (United States)

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Singapore's Aarden City Construction and Green Building Development

    Science.gov (United States)

    Xiong, Chenhui; Chen, Jian

    2018-05-01

    The government of Singapore has a high demand for city construction planning always adhere to the implementation of "garden city " theory. Singapore’s government has been following the "sustainable" of Singapore's requirement and fully embodies the "green building" and "environmental protection"concept. To set the ecological construction and protection of water resources as the total target, minimize damage to the environment of economic development, make Singapore a pioneer "green building". In recent years, the Chinese government is promoting green building but harvest little, in this case, for the development of "green building", China can draw lessons from Singapore's experience.

  18. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  19. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  20. Evaluation of Passive Vents in New Construction Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, Sean [Steven Winter Associates, Inc., Norwalk, CT (United States); Berger, David [Steven Winter Associates, Inc., Norwalk, CT (United States); Zuluaga, Marc [Steven Winter Associates, Inc., Norwalk, CT (United States)

    2016-02-01

    Exhaust ventilation and corresponding outdoor air strategies are being implemented in high-performance new construction multifamily buildings to meet program or code requirements for improved indoor air quality, but a lack of clear design guidance is resulting in poor performance of these systems despite the best intentions of the programs or standards. CARB's 2014 'Evaluation of Ventilation Strategies in New Construction Multifamily Buildings' consistently demonstrated that commonly used outdoor air strategies are not performing as expected. Of the four strategies evaluated in 2014, the exhaust ventilation system that relied on outdoor air from a pressurized corridor was ruled out as a potential best practice due to its conflict with meeting requirements within most fire codes. Outdoor air that is ducted directly to the apartments was a strategy determined to have the highest likelihood of success, but with higher first costs and operating costs. Outdoor air through space conditioning systems was also determined to have good performance potential, with proper design and execution. The fourth strategy, passive systems, was identified as the least expensive option for providing outdoor air directly to apartments, with respect to both first costs and operating costs. However, little is known about how they actually perform in real-world conditions or how to implement them effectively. Based on the lack of data available on the performance of these low-cost systems and their frequent use in the high-performance building programs that require a provision for outdoor air, this research project sought to further evaluate the performance of passive vents.

  1. Incorporating Lean Construction agent into the Building Standards Act: the Spanish case study

    Directory of Open Access Journals (Sweden)

    Brioso Xavier

    2016-12-01

    Full Text Available There is a demand for lean construction in Europe; even though lean construction is still an emerging field and there is growing interest, there are no regulations on this topic. The main objective of this research is to regulate this role when in a project and to define and develop a building agent structure, according to the Building Standards Act (LOE by its acronym in Spanish, to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain, there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, who are defined in the courts as “constructive managers” or similar. For this reason, courts could establish in the future several liabilities for the lean construction specialist and other agents of the project, depending on their actions and based on the implementation of the lean project delivery system, the target value design and the integrated project delivery. Conversely, it is possible that the level of action of the lean construction specialist may comprise design management, construction management and contract management. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the lean construction specialist. The creation of the following agents is proposed: design manager, construction manager and contract manager, definitions that are developed in this study. These agents are loosely defined, because any project manager, building information modeling manager or similar may act as one or as more-than-one of them. Finally, the creation of the lean construction manager is also proposed, as the agent who takes on the role of the design manager, construction manager and contract manager, but focused on the lean production principles.

  2. Investigation on factors that contribute to the abandonment of building in construction industry in Malaysia

    Science.gov (United States)

    Farhayu Ariffin, Nur; Jaafar, Mohd Faizal Md; Idris Ali, Mohamad; Irwan Ramli, Noram; Muthusamy, Khairunisa; Shukor Lim, Nor Hasanah Abdul

    2018-03-01

    In Malaysia, the construction sector is one of the important sectors that contribute to economic growth and employments. However, a major concern facing the construction industry is the growing rate of delays in project delivery. In the worse cases, the projects were abandoned due to some reasons when the contract period ended. Abandoned building defines as construction work that has been continuously stalled for 6 months or more, during the project completion period or beyond the scheduled date of completion. When the projects become abandoned, it gives an adverse effect on many parties such as the developer, contractor, consultant and also client. According to previous researchers, the abandonment of building causes a serious problem and need some mitigation plan to avoid this problem from occurring. This study will investigate the fundamental factors that contribute to the abandonment of building and projects in Malaysia based on the current data of the abandoned building in most states in Malaysia. The data was collected from the respondents who is in the construction industry and had experience working with abandoned housing project. Form the respondents perspective, it shows that the main factor contribute to the building abandonment is due to the financial problem facing by the developer company.

  3. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  4. Analyzing delay causes in Egyptian construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2014-01-01

    Full Text Available Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

  5. The Insight of Industrialised Building System (IBS By Bumiputera Construction Players

    Directory of Open Access Journals (Sweden)

    Muhammad W. M. N. W.

    2016-01-01

    Full Text Available The term Industrialised Building System (IBS is widely recognised by construction players in Malaysia since its first implementation since 1960s for IBS pilot projects of Pekeliling Flats and Rifle Range Flats. The aim for the implementation is to promote better system in delivering construction end-products which offers efficiency and effectiveness. At the same time, Bumiputera construction players are the majority of parties in construction industry especially in Small and Medium Enterprises (SMEs. Therefore, the purpose of this paper is to identify the perception and awareness of IBS implementation among Bumiputera players. It is found that, Bumiputera construction players have sound knowledge on the IBS and optimistic towards further implementation for future projects. Nonetheless, issues on payment methods and coordination of IBS project delivery are found to be the negative perceptions which are considered as hindrance for Bumiputera construction players’ involvement in IBS project.

  6. Identification of critical factors affecting flexibility in hospital construction projects.

    Science.gov (United States)

    Olsson, Nils E O; Hansen, Geir K

    2010-01-01

    This paper analyzes the dynamics relating to flexibility in a hospital project context. Three research questions are addressed: (1) When is flexibility used in the life cycle of a project? (2) What are the stakeholders' perspectives on project flexibility? And (3) What is the nature of the interaction between flexibility in the process of a project and flexibility in terms of the characteristics of a building? Flexibility is discussed from both a project management point of view and from a hospital architecture perspective. Flexibility in project life cycle and from a stakeholder perspective is examined, and the interaction between flexibility in scope lock-in and building flexibility is investigated. The results are based on case studies of four Norwegian hospital projects. Information relating to the projects has been obtained from evaluation reports, other relevant documents, and interviews. Observations were codified and analyzed based on selected parameters that represent different aspects of flexibility. One of the cases illustrates how late changes can have a significant negative impact on the project itself, contributing to delays and cost overruns. Another case illustrates that late scope lock-in on a limited part of the project, in this case related to medical equipment, can be done in a controlled manner. Project owners and users appear to have given flexibility high priority. Project management teams are less likely to embrace changes and late scope lock-in. Architects and consultants are important for translating program requirements into physical design. A highly flexible building did not stop some stakeholders from pushing for significant changes and extensions during construction.

  7. Construction Operations Building Information Exchange (COBIE)

    Science.gov (United States)

    2007-06-01

    Swalley U.S. Department of State, Overseas Buildings Operations Toby Wilson U.S. Army, Corps of Engineers, Engineer R&D Center Jeff Wix AEC3 The...exchanged in COBIE. To map those information exchanges to the IFC model, the Information Delivery Manual (IDM) process [ Wix 2007] was also used. The...Folksonomy. Wikimedia Foundation. http://en.wikipedia.org/wiki/Folksonomy/, accessed 3 August 2007. Wix , Jeffrey. 2007. Information Delivery Manual

  8. Deployable bamboo structure project: A building life-cycle report

    Science.gov (United States)

    Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.

    2017-11-01

    Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.

  9. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  10. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  11. Cost-derived indices for building design and construction ...

    African Journals Online (AJOL)

    Also as multiples of gfi, substructure cost index, sci and roofing cost index, rci could predict componental costs of substructure and roofing for phased development purposes. Keywords: Cost Indices, Building Design, Building Construction Journal of Modeling, Design and Management of Engineering Systems, Vol.

  12. Assessment of natural radiation exposure inside a newly constructed building

    International Nuclear Information System (INIS)

    Shukla, V.K.; Sadasivan, S.; Nambi, K.S.V.; Sundaram, V.K.

    1994-01-01

    Naturally occurring radionuclides in building materials are one of the sources of radiation exposure to the population. Several building materials used for a newly constructed building complex were analysed for 40 K, 238 U radioactivity by gamma ray spectrometry. The external gamma dose inside the complex was evaluated by using the computer code QAD-CGGP. External dose rate was also measured by using scintillation gamma monitor. Calculated and the measured dose rate values are discussed. (author). 11 refs., 2 figs., 2 tabs

  13. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  14. JET Project: progress in construction and management

    International Nuclear Information System (INIS)

    Bertolini, E.

    1978-01-01

    The JET Project of the European Community aims to construct and operate one of the largest Tokamak Devices foreseen at present in the field of Fusion Research. The aim of the experiment is to produce and study plasma conditions approaching those needed in a thermonuclear reactor and therefore will involve operation with deuterium--tritium gas

  15. New constructive solutions for building of transport construction facilities

    Directory of Open Access Journals (Sweden)

    Babayev Vladimir

    2017-01-01

    Full Text Available New structural systems for civil and transport engineering were examined. The basis for the formation of the proposed reinforced concrete structures is the ideology of reducing its dead weight, with a given bearing capacity, the realization of which is accomplished by burial during concreting large-sized liners of a given shape and manufactured from lightweight, inexpensive composite materials. The process of erecting these systems is presented in two forms: for flat structures - using self-tightening concrete, and for curvilinear ones - by using shotcrete technologies. The second direction is presented by steel-reinforced concrete structures. These structural systems were created on the basis of innovative component and methods of rationalization of parameters. The basis of the above methods is a compiler which includes the finite element method, adaptive evolution method and special iterative procedures. Experimental verification of structural solutions and formation procedures for suggested systems was performed. Comparison between theoretical and experimental data is given. Suggested systems were implemented in a number of building companies.

  16. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  17. Design Solutions for Sustainable Construction of Pre Engineered Steel Buildings

    Directory of Open Access Journals (Sweden)

    Muhammad Umair Saleem

    2018-05-01

    Full Text Available Sustainable construction of ecofriendly infrastructure has been the priority of worldwide researchers. The induction of modern technology in the steel manufacturing industry has enabled designers to get the desired control over the steel section shapes and profiles resulting in efficient use of construction material and manufacturing energy required to produce these materials. The current research study is focused on the optimization of steel building costs with the use of pre-engineered building construction technology. Construction of conventional steel buildings (CSB incorporates the use of hot rolled sections, which have uniform cross-section throughout the length. However, pre-engineered steel buildings (PEB utilize steel sections, which are tailored and profiled based on the required loading effects. In this research study, the performance of PEB steel frames in terms of optimum use of steel sections and its comparison with the conventional steel building is presented in detail. A series of PEB and CSB steel frames is selected and subjected to various loading conditions. Frames were analyzed using Finite Element Based analysis tool and design was performed using American Institute of Steel Construction design specifications. Comparison of the frames has been established in terms of frame weights, lateral displacements (sway and vertical displacements (deflection of the frames. The results have clearly indicated that PEB steel frames are not only the most economical solution due to lesser weight of construction but also have shown better performance compared to CSB frames.

  18. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  19. Self-Organized Construction with Continuous Building Material

    DEFF Research Database (Denmark)

    Heinrich, Mary Katherine; Wahby, Mostafa; Divband Soorati, Mohammad

    2016-01-01

    Self-organized construction with continuous, structured building material, as opposed to modular units, offers new challenges to the robot-based construction process and lends the opportunity for increased flexibility in constructed artifact properties, such as shape and deformation. As an example...... investigation, we look at continuous filaments organized into braided structures, within the context of bio-hybrids constructing architectural artifacts. We report the result of an early swarm robot experiment. The robots successfully constructed a braid in a self-organized process. The construction process can...... be extended by using different materials and by embedding sensors during the self-organized construction directly into the braided structure. In future work, we plan to apply dedicated braiding robot hardware and to construct sophisticated 3-d structures with local variability in patterns of filament...

  20. Identification of coordination factors affecting building projects performance

    Directory of Open Access Journals (Sweden)

    Wesam Salah Alaloul

    2016-09-01

    Full Text Available Construction projects performance requires improvement to fulfil the complexity of the stakeholders’ needs and expectations. Coordination process is proposed as an efficient solution for weak performance of construction projects. Therefore, coordination factors are vital in ensuring a successful implementation of all project phases. This study aimed to identify and prioritise coordination factors that influence the performance of building projects in Malaysian context. A vast body of literature on coordination process was reviewed and resulted in 53 coordination factor. Three rounds of Delphi technique were conducted. The most effective coordination factors were ranked based on the Relative Importance Index (RII such as Scheduling (RII = 0.97, Quality assurance plan (RII = 0.93, and all parties’ participation in plans (RII = 0.89. These coordination factors have fulfilled the research gap and provided better management and higher performance for project parties. The results offer insightful perspectives to define the most effective coordination factors, for addressing the dependency between project tasks and the parties to enhance project performance.

  1. Measures to reduce construction time of high-rise buildings

    Science.gov (United States)

    Kolchedantsev, Leonid; Adamtsevich, Aleksey; Stupakova, Olga; Drozdov, Alexander

    2018-03-01

    The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily - decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the "thermos" method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.

  2. MATHEMATICAL MODEL DESIGNATED FOR THE ASSESSMENT OF THE INTEGRATED ENVIRONMENTAL LOAD PRODUCED BY A BUILDING PROJECT

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2012-10-01

    The theoretical background of the proposed approach consists in an integrated methodology implemented in the system engineering of construction projects. A building system may be represented as the aggregate of all stages of construction works and participants involved in them. The building system is object-oriented, and it is implemented under the impact of pre-determined environmental factors. The core constituent of the building system represents a Production Technology Module (PTM, or summarized groups of processes. The model formula designated for the assessment of the intensity of the ecological load produced by the construction project onto the environment may be represented as follows:

  3. Distributing Resources in a Construction Project

    DEFF Research Database (Denmark)

    Axel, Erik

    2015-01-01

    In the present paper the status of theories are discussed. It will be based on the fact that our understanding comes out of our common activity, and we will take point of departure in some empirical material from a construction project. We shall explore a conception of conflictual cooperation, wh...... that accordingly theories must change with the process, that they are dissolving in praxis. Keywords: arrangement, common cause, concept, conflictual cooperation, contradictions, design of square, praxis, procedure, resources, theory....

  4. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  5. The occupational safety on the construction sites of the farm production buildings in Finland

    Directory of Open Access Journals (Sweden)

    M. Hellstedt

    2013-09-01

    Full Text Available The size of farms has increased considerably during Finland's EU membership. The growth has meant big investments in the new production buildings. The buildings have been switched to big industrialhall- like constructions from small-scale ones which have contained own timber and own work contribution. The objective of the project financed by Farmers' Social Insurance Institution was to improve occupational safety on farm building construction and renovation sites by disseminating current safety practices and by developing ways of action which are better than the prevailing ones. The project consisted of a literature review, statistical analysis, as well as a farmer and designer interviews. In the statistical analysis the MATA occupational injuries insurance claims database on farmers’ claims during construction and renovation work for the years 2005 - 2008 was compared with the register of Federation of Accident Insurance Institutions on the construction workers' injuries. In comparing the reasons of the accidents a clear difference was found; poor scaffoldings and ladders are still the main culprits on farm accidents. Farmer interviews were used to assess occupational safety measures on the construction site, occurred injuries and their types, nearmiss situations and the underlying factors which have led to the injuries. Also construction safety deficiencies as well as the direct and indirect costs caused for instance because of the delay in completion of construction project were discussed. Designer interviews aimed to find out how occupational safety and health considerations are taken into account in farm building planning and counseling, and how this experience of the designers should be utilized in order to improve safety at the construction sites on farms. Farmers knew their obligations on occupational safety poorly. The situation was further worsened by the fact that on the site the supervisor tasks were only nominally executed. The

  6. Building Software, Building Community: Lessons from the Ropensci Project

    Science.gov (United States)

    Boettiger, C.

    2014-12-01

    rOpenSci is a developer collective originally formed in 2011 by graduate students and post-docs from ecology and evolutionary biology to collaborate on building software tools to facilitate a more open and synthetic approach in the face of transformative rise of large and heterogeneous data. Born on the internet (the collective only began through chance discussions over social media), we have grown into a widely recognized effort that supports an ecosystem of some 45software packages, engages scores of collaborators, has taught dozens of workshops around the world, and has secured over $480,000 in grant support. As young scientists working in an academic context largely without direct support for our efforts, we have first hand experience with most of the the technical and social challenges in developing sustainable scientific software. I will summarize our experiences, the challenges we have faced, and describe our approach and success in building an effective and diverse community around the rOpenSci project.

  7. Decisive management in selecting locations for development of construction projects

    Science.gov (United States)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  8. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  9. Construction of the main building network environment in IHEP

    International Nuclear Information System (INIS)

    Wang Yanming

    2004-01-01

    Based on the new network structure at IHEP, we re-constructed the network in Main Building at IHEP in order to realize the goal of steadily supporting the network application. We chose high performance and administrable switches and configured them properly. This improved that the network security, management ability. So the network at Main Building became more safe, steady, reliable and high-efficient. (authors)

  10. Sustainable construction building performance simulation and asset and maintenance management

    CERN Document Server

    2016-01-01

    This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.

  11. Building for a Changing Climate - Adaptation through planning and construction

    Energy Technology Data Exchange (ETDEWEB)

    2009-08-15

    Adaptation through planning and construction can help to reduce the negative effects of climate change, such as flooding, landslides, landslips, and erosion. The National Board of Housing, Building and Planning (Boverket) has conducted an analysis of how the Planning and Building Act can assist in the work towards climate change adaptation. This brochure provides guidance and support to for example property owners, developers, officials and decision makers in municipalities and the state

  12. Utilization of building information modeling in infrastructure’s design and construction

    Science.gov (United States)

    Zak, Josef; Macadam, Helen

    2017-09-01

    Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.

  13. Carbon footprint of construction using industrialised building system

    Science.gov (United States)

    Lim, P. Y.; Yahya, K.; Aminudin, E.; Zakaria, R.; Haron, Z.; Mohamad Zin, R.; Redzuan, A. A. H.

    2017-11-01

    Industrialised Building System (IBS) is more sustainable to the environment as compared to the conventional construction methods. However, the construction industry in Malaysia has low acceptance towards IBS due to the resistance to change and also lack of awareness towards sustainability development. Therefore, it is important to study the amount carbon footprint produced by IBS during its manufacturing and construction stage, and also the amount of carbon footprint produced by one meter square of gross floor area of IBS construction using Life Cycle Assessment (LCA) to ease future research through the comparison of the carbon footprint of IBS with the conventional building system. As a result, a case study on a residential type of construction in the vicinity of Johor Bahru, Malaysia was carried out to obtain the necessary data and result. From the data analysis, the amount of greenhouse gases (GHG) for a residential type IBS construction based on the raw materials and resources involved to manufacture and construct IBS components is 0.127 tonnes fossil CO2Eq per meter square. Raw material that contributed to the most amount of carbon footprint is Ordinary Portland Cement (OPC), followed by steel bars, autoclaved aerated blocks and diesel. The LCA data acquired will be very useful in implementing IBS in the residential type construction. As a result, the awareness towards sustainable construction using IBS can be improved.

  14. VARIANT FOR CONSTRUCTION, REPAIR OR RECONSTRUCTION OF BUILDING

    Directory of Open Access Journals (Sweden)

    S. N. Osipov

    2016-01-01

    Full Text Available In the XXI century moral depreciation concept comprises not only deterioration of outside appearance of construction elements in the course of time but accelerated fashion changes in respect of interior design and rapid increase in technical level for residence buildings. For this reason if average rate of building dilapidation in the buildings of series 1–335, 1–335А and 1–464А constructed in Minsk within the period of 1957–1975 and being operated till 2005–2006 has constituted 25–29 % and their moral depreciation has been equal to more than 40 % then rate of the moral depreciation has significantly increased in the XXI century. Such situation requires execution of special investigations. High operating rates of refinancing have led to the necessity for record keeping of initial expenses and repairability levels because selection of building construction, repair or reconstruction variant depends on these parameters. Repairability classification of main elements of residence buildings and premises has been proposed for regulation of such selection procedure. In this case it is recommended to take into account technological effectiveness of repair and technical service, verifiability, accessibility, easy dismountability, substitutability and interchangeability of construction elements and technical devices. The paper presents nomograms that permit to make easier practical calculations on determination of cost-efficient time period for operation of the element prior to its substitution at various refinancing rates and also for comparison of relative initial expenses according to time service. 

  15. Lifting Wing in Constructing Tall Buildings —Aerodynamic Testing

    Directory of Open Access Journals (Sweden)

    Ian Skelton

    2014-05-01

    Full Text Available This paper builds on previous research by the authors which determined the global state-of-the-art of constructing tall buildings by surveying the most active specialist tall building professionals around the globe. That research identified the effect of wind on tower cranes as a highly ranked, common critical issue in tall building construction. The research reported here presents a design for a “Lifting Wing,” a uniquely designed shroud which potentially allows the lifting of building materials by a tower crane in higher and more unstable wind conditions, thereby reducing delay on the programmed critical path of a tall building. Wind tunnel tests were undertaken to compare the aerodynamic performance of a scale model of a typical “brick-shaped” construction load (replicating a load profile most commonly lifted via a tower crane against the aerodynamic performance of the scale model of the Lifting Wing in a range of wind conditions. The data indicate that the Lifting Wing improves the aerodynamic performance by a factor of up to 50%.

  16. Problem of dynamic impacts upon NPP buildings and constructions

    International Nuclear Information System (INIS)

    Kosterev, A.E.

    1998-01-01

    Activities of IAEA member-states dealing with the problems of taking into account external natural and technogenic impacts (earthquakes, cyclones, hurricanes, aircraft crushes, air shock waves) when designing NPP buildings and constructions important for nuclear and radiation safety are briefly discussed. It is concluded that development of IAEA general recommendations for taking into account specific dynamic impacts will improve noticeably safety of NPPs being in operation both in Russia and all over the World as a result of reconstruction of safety-important buildings and constructions

  17. Building envelope for New Buildings and Energy Renovation of Existing Buildings. Project results

    DEFF Research Database (Denmark)

    Rudbeck, Claus Christian; Rose, Jørgen; Esbensen, Peter Kjær

    1999-01-01

    of heat- and moistureflow is insufficiently documented for large insulation thicknesses. Thermal bridges, for instance, plays a larger role for the overall heat loss in these constructions, and moisture in insulation materials will decrease the overall performance of the construction.Due to these facts...... on the following subjects:Scientific basis for calculation programs, Development of calculationsmethods for heat transfer, Development of new building envelope components, Roofing system based on wooden roof elements, Roofing system with drying properties, Moisture uptake and drying from brick constructions...

  18. Safety concerns related to modular/prefabricated building construction.

    Science.gov (United States)

    Fard, Maryam Mirhadi; Terouhid, Seyyed Amin; Kibert, Charles J; Hakim, Hamed

    2017-03-01

    The US construction industry annually experiences a relatively high rate of fatalities and injuries; therefore, improving safety practices should be considered a top priority for this industry. Modular/prefabricated building construction is a construction strategy that involves manufacturing of the whole building or some of its components off-site. This research focuses on the safety performance of the modular/prefabricated building construction sector during both manufacturing and on-site processes. This safety evaluation can serve as the starting point for improving the safety performance of this sector. Research was conducted based on Occupational Safety and Health Administration investigated accidents. The study found 125 accidents related to modular/prefabricated building construction. The details of each accident were closely examined to identify the types of injury and underlying causes. Out of 125 accidents, there were 48 fatalities (38.4%), 63 hospitalized injuries (50.4%), and 14 non-hospitalized injuries (11.2%). It was found that, the most common type of injury in modular/prefabricated construction was 'fracture', and the most common cause of accidents was 'fall'. The most frequent cause of cause (underlying and root cause) was 'unstable structure'. In this research, the accidents were also examined in terms of corresponding location, occupation, equipment as well as activities during which the accidents occurred. For improving safety records of the modular/prefabricated construction sector, this study recommends that future research be conducted on stabilizing structures during their lifting, storing, and permanent installation, securing fall protection systems during on-site assembly of components while working from heights, and developing training programmes and standards focused on modular/prefabricated construction.

  19. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  20. Community involvement in constructing village health buildings in Uganda and Sierra Leone.

    Science.gov (United States)

    Mitchell, M

    1995-11-01

    Three public health projects in Uganda and Sierra Leone are used to illustrate a new approach to construction of health buildings in villages. Emphasis is placed on community involvement. The health projects were comprehensive and relied on health education, employment of local village health workers, and establishment of village health committees. The objective of community involvement was described as encouragement of people to change their own diets and living conditions. This approach to primary health care is considered to be a strong basis for sustainable social development. Each of the three communities initiated the building projects slightly differently. There was a range of structures: traditional meeting halls, simple rooms with imported materials and a pit latrine, new buildings combining local and imported materials and labor, new nontraditional buildings, rehabilitated existing nontraditional buildings with imported labor and materials, and temporary mobile clinics. Community involvement was at different levels. All three projects were the result of a combined effort of national governments or mission hospitals, nongovernmental organizations, and the host community. The following should be considered before beginning construction: a suitable site, appropriate staff accommodation, the likely motivation of the host community, seasonality, local materials available, availability of skilled labor, and design. A plan of work during construction should include a building design, site supervision, transportation of local and non-local materials, unskilled labor, and skilled labor. Village health committees with or without government help would be responsible for maintenance of buildings after construction. A key feature of this approach is the assessment of the community's ability and capacity to contribute.

  1. Specific features of modern multifunctional high-rise building construction

    Science.gov (United States)

    Manukhina, Lyubov; Samosudova, Natal'ja

    2018-03-01

    The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.

  2. Environmental impact assessment for the Nova projects (Building 391 complex)

    International Nuclear Information System (INIS)

    Odell, B.N.

    1979-01-01

    The environmental impact assessment of the Nova projects (Building 391 Complex) describes (1) the proposed actions, (2) the existing environment in and around the Livermore Valley, and (3) the potential environmental impacts from the construction and operation of these facilities. It shows that the proposed action does not conflict with any Federal, State, Regional, or Local Plans and Programs. Possible alternatives to the proposed action are discussed. However, it is concluded that the proposed actions were the most reasonable of the alternatives and would involve relatively minor adverse environmental impacts

  3. Application of Supply Chain Performance Measurement in Scor Model at Building Project

    OpenAIRE

    Wibowo, Mochamad Agung; Sholeh, Moh Nur

    2016-01-01

    The supply chain has become a priority subject of management research and manufacturing theory in recent years. It has also become an interesting topic in the construction industry. Construction supply chain management is more concerned with the coordination of discrete quantities of materials delivered to a specific construction project. Currently, in some building project, there has been no standard indicators in measuring the performance of the supply chain. Therefore, further research is ...

  4. Commutative algebra constructive methods finite projective modules

    CERN Document Server

    Lombardi, Henri

    2015-01-01

    Translated from the popular French edition, this book offers a detailed introduction to various basic concepts, methods, principles, and results of commutative algebra. It takes a constructive viewpoint in commutative algebra and studies algorithmic approaches alongside several abstract classical theories. Indeed, it revisits these traditional topics with a new and simplifying manner, making the subject both accessible and innovative. The algorithmic aspects of such naturally abstract topics as Galois theory, Dedekind rings, Prüfer rings, finitely generated projective modules, dimension theory of commutative rings, and others in the current treatise, are all analysed in the spirit of the great developers of constructive algebra in the nineteenth century. This updated and revised edition contains over 350 well-arranged exercises, together with their helpful hints for solution. A basic knowledge of linear algebra, group theory, elementary number theory as well as the fundamentals of ring and module theory is r...

  5. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Directory of Open Access Journals (Sweden)

    Venkrbec Vaclav

    2017-12-01

    Full Text Available Building information modeling (BIM can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  6. TRIP RATES FOR CONDOMINIUM CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    Wirach Hirun

    2015-01-01

    Full Text Available The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1 trip rates for all vehicles, 2 trip rates for classified vehicles, and 3 trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.

  7. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  8. Unbonded prestressing tendons and their role in the construction of slender elements of buildings

    Science.gov (United States)

    Mieszczak, M.

    2018-03-01

    Steel unbonded tendons have been introduced in Europe for construction prestressing many years later than in the USA, Honkong, Singapore or Australia. In Poland, they appeared in the early 1990s. Despite their short application, in the last decade, the Institute of Materials and Building Constructions of the Cracow University of Technology in cooperation with the TCE Structural Design & Consulting company has developed and implemented several interesting and unique designs of building components, using the advantages of this type of prestressing. In the author’s work, apart from the short description of these tendons, several selected (own and foreign) projects of unique character have been presented.

  9. PROSPECTS OF ESTABLISHING EARTHQUAKE RESISTANT BUILDINGS FROM TUBE CONCRETE CONSTRUCTIONS

    Directory of Open Access Journals (Sweden)

    Abdujafar I. Akaev

    2017-01-01

    Full Text Available Abstract. Objectives The aim of the research is to find optimal design solutions for the erection of buildings that will ensure their reliability and durability, compliance with environmental requirements, fire resistance and earthquake resistance. In this regard, the task is to determine the advantages and prospects of erecting earthquake resistant buildings from tube concrete constructions, since they are distinct in constructive, technological and economic efficiency when are used as vertical load-bearing struts of high-rise buildings. Method The technique for calculating the strength of normal sections of eccentrically-compressed tube concrete elements uses a nonlinear deformation model, taking into account the joint operation of the steel shell and the concrete core under the conditions of triaxial compression. Results In the article the review of the newest world experience of using tube concrete as vertical load-bearing structures for public facilities from the standpoint of earthquake resistant construction is given. The international practices of public facility construction ranging in height from 100 to 600 m with the use of tube concrete technology, including regions with dangerous natural and man-made conditions, have been studied. The structural, operational and technological advantages and disadvantages of tube concrete technology are analysed. Methods for calculating the strength of concrete tube elements in the case of central compression are considered: according to the so-called deformation theory, the state of total destruction of both concrete and tube fluidity attained at maximum pressure are indicated by the beginning of "tube flow on the longitudinal axis". The advantages and disadvantages of both methods are shown. Factors constraining the introduction and wider application of tube concrete constructions in Russia are considered. Conclusion While the advantages of concrete tube constructions in their extensive

  10. Building Green: Construction for the 21st Century

    Science.gov (United States)

    Phillipson, Todd

    2012-01-01

    At Jefferson County Vocational School (JCVS) in Bloomingdale, Ohio, students get a lesson on building green with the construction of a home in the school's subdivision. The home is being built using Energy Star guidelines so that it may be identified as an Energy Star home. The goal for the Jefferson County Vocational Schools Board of Education…

  11. Appraisal of systematic training practices by building construction ...

    African Journals Online (AJOL)

    It was observed that 89.65% and 91.38% of the respondents agree that management and technical staff training is only embarked on when needed: that ITF ... of building construction workers serves a means of maintaining standards and ensuring that those who are newly engaged into existing jobs and practices are able ...

  12. Push an pull forces in the building and construction industry

    NARCIS (Netherlands)

    Frings-Dresen, M. H. W.; Windhorst, Judith; Hoozemans, M. J M; Van Der Beek, Allard J.; Van der Molen, Henk F.

    2000-01-01

    Push and pull activities are increasing in the building and construction industry. These activities can be assumed as one of the risk factors for the development of low back and upper extremity complaints. For a risk evaluation, besides the frequency and the duration of the activities, information

  13. Apprenticeship Bullying in the Building and Construction Industry

    Science.gov (United States)

    Riggall, Michaela; Skues, Jason; Wise, Lisa

    2017-01-01

    Purpose: The purpose of this paper is to explore the definition, prevalence, antecedents, consequences and coping behaviours associated with apprenticeship bullying in the building and construction industry. Design/methodology/approach: The sample comprises 13 participants aged between 22 and 27 (M = 23.8, SD = 1.26) who were all men who had…

  14. Evaluation of Passive Vents in New Construction Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, Sean [Steven Winter Associates, Norwalk, CT (United States); Berger, David [Steven Winter Associates, Norwalk, CT (United States); Zuluaga, Marc [Steven Winter Associates, Norwalk, CT (United States)

    2016-02-01

    Exhaust ventilation and corresponding outdoor air strategies are being implemented in high performance, new construction, multifamily buildings to meet program or code requirements for improved indoor air quality, but a lack of clear design guidance is resulting in poor performance of these systems despite the best intentions of the programs or standards.

  15. Energy plus standard in buildings constructed by housing associations?

    International Nuclear Information System (INIS)

    Stutterecker, Werner; Blümel, Ernst

    2012-01-01

    In order to achieve national, European and international energy goals, energy efficiency strategies in the building sector have to be implemented. The passive house standard and low energy standards are already successfully established in single dwelling houses. These high performance standards are starting to penetrate into the sector of housing associations. A case study about an apartment building constructed by a housing association is presented here. It describes the monitoring concept and the results of the 1st year of monitoring. Depending on the definition of the zero energy building standard (extent of loads included in the balancing), the building could be classified as an energy plus building or as a building, which uses more energy, than is supplied by on-site generation. If the building's total energy use (including user specific loads) is defined as load, only 34.5% of these loads were provided by the net energy output of the PV system. If only the heating energy demand is defined as load, the PV system even yielded a surplus of 45.6% of the energy load. -- Highlights: ► Energy monitoring of an apartment building constructed by a housing association. ► Planned as a Passive House with a semi-central ventilation system with decentralized heat pump technology. ► Total end energy demand of the building was 43 kWh/(m² a). ► Total net energy generation by the PV system was 15 kWh/(m² a). ► Apartment no. 1: 52% of the energy demand were used for heating and ventilation.

  16. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong.

    Science.gov (United States)

    Jaillon, L; Poon, C S; Chiang, Y H

    2009-01-01

    As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.

  17. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  18. Research methods of the parameters of residential buildings construction

    Directory of Open Access Journals (Sweden)

    Grigor’ev Vladimir Aleksandrovich

    Full Text Available The analysis of construction theory and practice shows that rational organizational and technological parameters of the construction of residential buildings should be based on the manifestation in time and space of the most important stages construction with their harmonization. Basing on the experience of normalizing the construction duration, it is advisable to express the complex of residential buildings’ construction processes by their basic stages - preparatory period, underground part, aboveground part, external engineering networks and land improvement. The main indicators of the development and implementation of optimization solutions are: the total duration of the construction, the duration of the preparation period, the duration of the construction of the underground part, the duration of the construction of the aboveground part, the duration of external engineering networks laying, the duration of land improvement. The indicators of the total duration of the construction of residential buildings, the construction the underground and aboveground parts are determined on the basis of the operation of one assembly crane on an object of up to four sections. In case of more sections two (three cranes are considered and the total construction duration is set depending on these conditions. The duration of the construction of multisectional buildings is determined basing on the simultaneous construction of the stages or their combination with a certain time shift. However, this approach requires a significant amount of optimization solutions due to its multivariance. Therefore, in order to reduce the volume of calculations in some cases, for example, when planning the development of districts and neighborhoods, statistical methods can be used for determining the duration of the construction basing on the compilation of optimization solutions. The total duration of the construction and the duration of the main stages are multiple

  19. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  20. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  1. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  2. Colorado Better Buildings Project. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strife, Susie [Boulder County, Boulder, CO (United States); Yancey, Lea [Boulder County, Boulder, CO (United States)

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  3. Evaluation for rigidity of box construction of nuclear reactor building

    International Nuclear Information System (INIS)

    Yamakawa, Tetsuo

    1979-01-01

    A huge box-shaped structure (hereafter, called box construction) of reinforced concrete is presently utilized as the reactor building structure in nuclear power plants. Evaluation of the rigidity of the huge box construction is required for making a vibration analysis model of nuclear reactor buildings. It is necessary to handle the box construction as the plates to which the force in plane is applied. This paper describes that the bending theory in elementary beam theory is equivalent to a peculiar, orthogonally anisotropic plate, the shearing rigidity and film rigidity in y direction of which are put to infinity and the Poisson's ratio is put to zero, viewed from the two-dimensional theory of elasticity. The form factor of 1.2 for shearing deformation in rectangular cross section was calculated from the parabolic distribution of shearing stress intensity, and it is the maximum value. The factor is equal to 1.2 for slender beams, but smaller than 1.2 for short and thick beams, having tendency to converge to 1.0. The non-conformity of boundary conditions regarding the shearing force at the both ends of cantilevers does not affect very seriously the evaluation of shearing rigidity. From the above results, it was found that the application of the theory to the box construction was able to give the rigidity evaluation with sufficient engineering accuracy. The theory can also be applied to the evaluation of tube type ultrahigh buildings. (Wakatsuki, Y.)

  4. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  5. Safety Culture in New Build Projects

    International Nuclear Information System (INIS)

    Reiman, T.

    2016-01-01

    The concept of culture emphasises the social factors that have an effect on the way hazards are perceived, risks are evaluated, risk management is conducted, the current safety level is interpreted, and what is considered normal and what abnormal. It also contributes to defining the correct ways to behave in situations and correct ways to talk about safety, risks or uncertainty. Culture is something the company has created for itself that then has an effect on the company. This effect is not necessarily perceived by the company itself, since the members of the organization consider all things that happen according to their cultural taken-for-granted assumptions (“business as usual”). Thus, safety culture can either hinder or advance nuclear safety. This depends on what the shared values and assumptions are, and how they are in line with, and influence, the organizational structures, practices, personnel and technology. Safety culture requires constant and systematic development, monitoring and review during the entire life-cycle of a nuclear facility. The pre-operational phase sets many unique requirements for nuclear safety culture. For example, some of the organizations and individuals involved in the project may have no insight on how safety culture relates to nuclear power plants. Companies that work in the conventional industry typically associate safety with occupational safety issues, not with nuclear safety. Further, it may be unclear how the construction phase affects nuclear safety of an operating plant. When workers are asked to perform their work differently than previously (e.g., in conventional construction sites), explanation has to be given. For example, structures, systems and components may have different functions during emergency that exceed or differ from their quality requirements during normal operation. The strict quality requirements and use of certain methods and procedures, documentation requirements, etc., may seem unimportant if

  6. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  7. Estimation of construction and demolition waste volume generation in new residential buildings in Spain.

    Science.gov (United States)

    Villoria Sáez, Paola; del Río Merino, Mercedes; Porras-Amores, César

    2012-02-01

    The management planning of construction and demolition (C&D) waste uses a single indicator which does not provide enough detailed information. Therefore the determination and implementation of other innovative and precise indicators should be determined. The aim of this research work is to improve existing C&D waste quantification tools in the construction of new residential buildings in Spain. For this purpose, several housing projects were studied to determine an estimation of C&D waste generated during their construction process. This paper determines the values of three indicators to estimate the generation of C&D waste in new residential buildings in Spain, itemizing types of waste and construction stages. The inclusion of two more accurate indicators, in addition to the global one commonly in use, provides a significant improvement in C&D waste quantification tools and management planning.

  8. Building information modelling (BIM) after ten years: Malaysian construction players’ perception of BIM

    Science.gov (United States)

    Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.

    2017-08-01

    Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.

  9. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  10. Application of Building Information Modeling (3D and 4D in Construction Sector in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2017-10-01

    Full Text Available Building Information Modeling (BIM is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world. The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a framework to application of BIM and identifying the benefits of this technology that would convince stakeholders for adopting BIM in the construction sector in Iraq. Through this research, the use of this technology has been clarified by using the proposed framework (application Revit software and linking it with the MS Project and Navisworks Manage software on the case study to identify the important benefits to be the beginning to apply the Building Information Modeling technology in the construction sector in Iraq. The research results indicated that such proposed framework can greatly improve the performance of the current state of project management through improving the project quality, cost saving and time-saving.

  11. Reducing failures rate within the project documentation using Building Information Modelling, especially Level of Development

    Directory of Open Access Journals (Sweden)

    Prušková Kristýna

    2018-01-01

    Full Text Available Paper´s focus is on differences between traditional modelling in 2D software and modelling within the BIM technology. Research uncovers failures connected to the traditional way of designing and construction of project documentation. There are revealed and shown mismatches within the project documentation. Solution within the Building information modelling Technology is outlined. As a reference, there is used experience with design of specific building in both ways of construction of project documentation: in the way of traditional modelling and in the way when using BIM technology, especially using Level of Development. Output of this paper is pointing to benefits of using advanced technology in building design, thus Building Information Modelling, especially Level of Development, which leads to reducing failures rate within the project documentation.

  12. Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model

    Directory of Open Access Journals (Sweden)

    Ming Li

    2017-09-01

    Full Text Available Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional architecture. Hence, it is especially important to improve its investment risk identification and management. This study adopts system dynamics and builds a risk identification feedback chart and risk flow chart, to comprehensively identify investment risks that projects in China may face and to process quantitative estimation of investment risk factors. Key factors influencing project investment risks are found, and corresponding measures are pointedly proposed. This paper may provide guidance and a reference for promoting the sound development of prefabricated construction in China.

  13. Project and construction of a digital chronoanalyser

    International Nuclear Information System (INIS)

    Cavalcante, M.A.

    1983-01-01

    The project, the construction and the operation tests of a new electronic system for measuring half-lives of nuclear excited states in the range from 10 -7 to 10 -5 seconds are presented. The proposed method uses logic circuits of the TTL family. The time scale is obtained from a phase locked-loop quartz oscillator; the formation instant of excited state of interest is obtained by JK flip-flop through its negative transition edge. This system uses ten channels of frequency counters, controlled by logic gates, to measure successively gamma rays emitted between the instant of birth of an excited state and its de excitation time. The performance of system was verified by gamma ray decay from 137 Cs and 60 Co. (Author) [pt

  14. Relationship between Performance of Quantity Surveying Students in Building Construction and Construction Measurement Courses

    Directory of Open Access Journals (Sweden)

    Olatunde Nathaniel Ayinde

    2018-01-01

    Full Text Available Stakeholders in the educational sector over the century have devoted substantial resources in seeking ways of improving students’ academic performance, yet, the desired improved academic performance has not been achieved. By appraising the relationship between the performance of Quantity Surveying (QS students in Building Construction and Construction Measurement courses; the study identified a major curriculum drafting deficiency in the QS programmes in Nigeria which if addressed could help achieve the much needed improved students’ academic performance. The specific objectives of the study were to determine the performance of QS students in Building construction and construction Measurement Courses; and to determine whether a relationship exist in the performances of QS students in the two subject areas. Purposive sampling technique was used to select Federal Polytechnic Ede, Osun State for the study. Random sampling technique was used to select 241 students who provide data for the study. Close ended questionnaire was used to collect data for the study and data was analyzed using frequency, percentile and correlation analysis. Finding indicates that 43% of the respondents on the average put up good performances in Building Construction Courses while only 19% of the respondents on the average had good grades in Construction Measurement Courses. Results also showed that a significant relationship exist between the performance of QS students in Building Construction and Construction Measurement courses as 83.3% (five out of six pair courses shows significant positive linear correlation. The study recommends that a quick curriculum re-adjustment should be initiated so as to enhance improved academic performance by QS Students especially in Construction Measurement courses.

  15. A Study of Work Based Learning For Construction Building Workers

    Science.gov (United States)

    Siregar, Syafiatun

    2018-03-01

    Work-based learning (WBL) is designed to improve the competence of participants. This study aims to apply the WBL and to develop attitudes, knowledge, skills, behaviors, and habits, which in turn can improve the competence of construction workers in the field to be sampled. This research was conducted on building construction workers in Medan City with 30 research subjects. The results showed that the evaluation of learning increased in phase I obtained the difference of the average score of 20.9 (the meeting I) and 25.50 (meeting II). The final result shows that the level of activity and competence increased significantly after WBL

  16. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  17. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  18. Constructions and classifications of projective Poisson varieties

    Science.gov (United States)

    Pym, Brent

    2018-03-01

    This paper is intended both as an introduction to the algebraic geometry of holomorphic Poisson brackets, and as a survey of results on the classification of projective Poisson manifolds that have been obtained in the past 20 years. It is based on the lecture series delivered by the author at the Poisson 2016 Summer School in Geneva. The paper begins with a detailed treatment of Poisson surfaces, including adjunction, ruled surfaces and blowups, and leading to a statement of the full birational classification. We then describe several constructions of Poisson threefolds, outlining the classification in the regular case, and the case of rank-one Fano threefolds (such as projective space). Following a brief introduction to the notion of Poisson subspaces, we discuss Bondal's conjecture on the dimensions of degeneracy loci on Poisson Fano manifolds. We close with a discussion of log symplectic manifolds with simple normal crossings degeneracy divisor, including a new proof of the classification in the case of rank-one Fano manifolds.

  19. Constructions and classifications of projective Poisson varieties.

    Science.gov (United States)

    Pym, Brent

    2018-01-01

    This paper is intended both as an introduction to the algebraic geometry of holomorphic Poisson brackets, and as a survey of results on the classification of projective Poisson manifolds that have been obtained in the past 20 years. It is based on the lecture series delivered by the author at the Poisson 2016 Summer School in Geneva. The paper begins with a detailed treatment of Poisson surfaces, including adjunction, ruled surfaces and blowups, and leading to a statement of the full birational classification. We then describe several constructions of Poisson threefolds, outlining the classification in the regular case, and the case of rank-one Fano threefolds (such as projective space). Following a brief introduction to the notion of Poisson subspaces, we discuss Bondal's conjecture on the dimensions of degeneracy loci on Poisson Fano manifolds. We close with a discussion of log symplectic manifolds with simple normal crossings degeneracy divisor, including a new proof of the classification in the case of rank-one Fano manifolds.

  20. Progressive building methods in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sikura, V.

    1980-01-01

    A detailed description is given of the new prospective technologies used in the construction of the Bohunice V-1 nuclear power plant. They include the use of steel and large-area forms, the use of profile sheets as a substitute for forms, assembled raw partitions, wall shells consisting of clamped porous concrete slabs, assembled roof shells, special finish of concrete walls, bearing wall deep foundation, the use of modern building machinery for concreting, reinforcing and welding works. (M.S.)

  1. Oriented strand board: new material for building construction

    International Nuclear Information System (INIS)

    Paridah Md Tahir; Ong, L.L.

    2001-01-01

    The paper will attempt to show the suitability and competitiveness of oriented strand board (OSB) in building construction. One important factor underlining the success of this product is the availability of the wood raw material. Plantation timbers such as rubberwood, paraserianthes falcataria, acacia crassicarpa, A. auriculiformis and A. mangium have been identified as the major source of this industry. We will focus on the domestic market as well as export market especially on the Asia Pacific region

  2. Materials development and field demonstration of high-recycled-content concrete for energy-efficient building construction; FINAL

    International Nuclear Information System (INIS)

    Ostowari, Ken; Nosson, Ali

    2000-01-01

    The project developed high-recycled-content concrete material with balanced structural and thermal attributes for use in energy-efficient building construction. Recycled plastics, tire, wool, steel and concrete were used as replacement for coarse aggregates in concrete and masonry production. With recycled materials the specific heat and thermal conductivity of concrete could be tailored to enhance the energy-efficiency of concrete buildings. A comprehensive field project was implemented which confirmed the benefits of high-recycled-content concrete for energy-efficient building construction

  3. Information-representation methods and tools or the Smart Swap Building strategic project

    Directory of Open Access Journals (Sweden)

    Marco Medici

    2016-06-01

    Full Text Available  Within the Smart Swap Building project for the housing renewal, the representative tool is an integrated part of the building design process and becomes an element to support complex decision-making processes, integrating different skills in different stages of the building life cycle. The use of Building Information Modeling (BIM tools not only allow a transparent design phase but covers the whole building process, relating technological and structural elements with construction scheduling (4D, cost estimation (5D, certification (6D and management of the life cycle (7D + CAFM, allowing more sustainable and aware choices.

  4. Evolution of building envelope construction techniques in coastal British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    Mattock, C.; Ito, K.; Oshikawa, T. [International Eco-House Inc., (Canada)

    1999-11-01

    Changes in the significant evolutionary development over the past 3 years in building envelope construction for multi storey wood frame housing in British Columbia are described. The urban areas of this region are characterized by a maritime climate which features a high frequency of wind driven rain and little accumulation of snow. Buildings are exposed to high wetting with little drying potential, and moderate temperatures allow for fungal growth even in the winter. While as in the rest of Canada wetting is often due to condensation of moisture contained in indoor air as it leaks out of the building, in British Columbia wind driven rain is a much larger source of moisture. Given this, the following principles of moisture control have been promoted to the B.C. building industry in order of priority: 1) deflection - using parts and elements of the building such as overhangs and flashings that reduce the exposure of the exterior walls to rain, 2) drainage - using envelope assemblies that will then redirect liquid water to the outside, 3) employing drying elements that promote drying through diffusion such as highly permeable wall sheathings, and 4) use of durable materials - using materials that resist rot such as treated lumber, stainless steel fastenings, etc. A variety of air barrier systems other than the conventional sealed polyethylene approach have been employed because of the introduction of recent building code requirements for enhanced airtightness and air barrier durability combined with the use of rain screen construction. This variety of air barrier systems includes: an airtight drywall, an exterior permeable membrane, and an exterior impermeable membrane.

  5. Construction Project Leadership from the Perspective of Islam

    OpenAIRE

    MUHAMAD ROSDI SENAM; KHAIRUDDIN ABDUL RASHID; AZILA AHMAD SARKAWI; RAPIAH MOHD. ZAINI

    2014-01-01

    Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project managem...

  6. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  7. Structure of steel reactor building and construction method therefor

    International Nuclear Information System (INIS)

    Yamakawa, Toshikimi.

    1997-01-01

    The building of the present invention contains a reactor pressure vessel, and has double steel plate walls endurable to elevation of inner pressure and keeping airtightness, and shielding concretes are filled between the double steel plate walls. It also has empty double steel plate walls not filled with concretes and has pipelines, vent ducts, wirings and a support structures for attaching them between the double steel plate walls. It is endurable to a great inner pressure satisfactory and keeps airtightness by the two spaced steel plates. It can be greatly reduced in the weight, and can be manufactured efficiently with high quality in a plant by so called module construction, and the dimension of the entire of the reactor building can be reduced. It is constructed in a dock, transported on the sea while having the space between the two steel plate walls as a ballast tanks, placed in the site, and shielding concretes are filled between the double steel plate walls. The term for the construction can be reduced, and the cost for the construction can be saved. (N.H.)

  8. Evaluation of Ventilation Strategies in New Construction Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, S.; Berger, D.; Zuluaga, M.

    2014-07-01

    In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the 'fresh' air is coming from is gaining significance as air-tightness standards for enclosures become more stringent, and the 'normal leakage paths through the building envelope' disappear. CARB researchers have found that the majority of high performance, new construction, multifamily housing in the Northeast use one of four general strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unit HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. Insufficient information is available to designers on how these various systems are best applied. Product performance data are based on laboratory tests, and the assumption is that products will perform similarly in the field. Proper application involves matching expected performance at expected building pressures, but there is no guarantee that those conditions will exist consistently in the finished building. This research effort, which included several weeks of building pressure monitoring, sought to provide field validation of system performance. The performance of four substantially different strategies for providing make-up air to apartments was evaluated.

  9. Building Information Modeling for Managing Design and Construction

    DEFF Research Database (Denmark)

    Berard, Ole Bengt

    outcome of construction work. Even though contractors regularly encounter design information problems, these issues are accepted as a condition of doing business and better design information has yet to be defined. Building information modeling has the inherent promise of improving the quality of design...... information for work tasks. * Amount of Information – the number of documents and files, and other media, should be appropriate for the scope. The criteria were identified by empirical studies and theory on information quality in the architectural, engineering and construction (AEC) industry and other fields......Contractors planning and executing construction work encounter many kinds of problems with design information, such as uncoordinated drawings and specification, missing relevant information, and late delivery of design information. Research has shown that missing design information and unintended...

  10. New instruments for dynamic building-construction : Computer as partner in construction

    NARCIS (Netherlands)

    van Rees, R.

    2007-01-01

    For dynamic processes to become possible in Building-Construction, ICT support is needed. Data access and data exchange needs to be ubiquitous. Existing research often only targets elaborate international standards (that don't really get off the ground because of international differences) or it

  11. Prevention of radioactive gas seeping into buildings through constructive materials

    International Nuclear Information System (INIS)

    Khaydarov, R.A.; Gapurova, O.U.; Khaydarov, R.R.

    2004-01-01

    Full text: One of possible method of realization of the terrorist acts is using gases and liquids, which easily permeate through the constructive materials of walls, floor, ceiling, roof, etc. into buildings by the capillary action of the pores. Toxic volatile organic compounds, organic and inorganic gases, radioactive elements, especially, which emits alpha particles can be used as the dangerous substances. Increased ventilation may help in removing the gases, but can actually increase the gases level by increasing the suction through the pores of concrete. If the gases and liquids are soluble in water and are easily volatilized from it, they can also get by groundwater up to underground structures and penetrate inside through opening and pores in concrete or pushed by hydrostatic pressure. The purpose of this work is creating a method to reduce concentration of toxic and radioactive gases in homes, buildings, underground buildings, tunnels, hangars, garages, bomb shelters, etc. The most effective method to prevent penetration of radionuclides into premises of buildings and underground structures through walls, roofs, floors is using special chemicals, which seal micropores inside the construction materials against gases. Worked out chemicals which consist of blend of polymeric compounds are described in the paper. Radioactive gases permeability in constructive materials after treatment by chemicals was studied. Influence of types of cement, sand and gypsum, preliminary treatment by different chemicals, different types of polymeric compounds, time between treatments, moisture of materials, time between preparation of chemicals and treatment of materials (aging of chemicals), time between treatment of concrete and testing (aging of treated concrete) were examined. Experiments have shown that our method allows reducing the coefficient of gas permeability 200 - 400 times

  12. Exploration of Team Integration in Spanish Multifamily Residential Building Construction

    OpenAIRE

    Pellicer, Eugenio; Sanz Benlloch, María Amalia; Esmaeili, B.; MOLENAAR, KEITH ROBERT

    2016-01-01

    Project delivery team integration generally involves early involvement of general contractors and key specialty contractors in the design process. Team integration has been found to improve an owner’s probability of success. However, during difficult economic times, owners can forego early team involvement and move toward low bid procurement to take advantage of competitive markets. This study explores the performance of integrated teams in the Spanish multifamily building constructi...

  13. A RISK BASED METHODOLOGY TO ASSESS THE ENERGY EFFICIENCY IMPROVEMENTS IN TRADITIONALLY CONSTRUCTED BUILDINGS

    Directory of Open Access Journals (Sweden)

    D. Herrera

    2013-07-01

    Full Text Available In order to achieve the CO2 reduction targets set by the Scottish government, it will be necessary to improve the energy efficiency of existing buildings. Within the total Scottish building stock, historic and traditionally constructed buildings are an important proportion, in the order of 19 % (Curtis, 2010, and represent cultural, emotional and identity values that should be protected. However, retrofit interventions could be a complex operation because of the several aspects that are involved in the hygrothermal performance of traditional buildings. Moreover, all these factors interact with each other and therefore need to be analysed as a whole. Upgrading the envelope of traditional buildings may produce severe changes to the moisture migration leading to superficial or interstitial condensation and thus fabric decay and mould growth. Retrofit projects carried out in the past have failed because of the misunderstanding, or the lack of expert prediction, of the potential consequences associated to the envelope's alteration. The evaluation of potential risks, prior to any alteration on building's physics in order to improve its energy efficiency, is critical to avoid future damage on the wall's performance or occupants' health and well being. The aim of this PhD research project is to point out the most critical aspects related to the energy efficiency improvement of traditional buildings and to develop a risk based methodology that helps owners and practitioners during the decision making process.

  14. Waste generated in high-rise buildings construction: a quantification model based on statistical multiple regression.

    Science.gov (United States)

    Parisi Kern, Andrea; Ferreira Dias, Michele; Piva Kulakowski, Marlova; Paulo Gomes, Luciana

    2015-05-01

    Reducing construction waste is becoming a key environmental issue in the construction industry. The quantification of waste generation rates in the construction sector is an invaluable management tool in supporting mitigation actions. However, the quantification of waste can be a difficult process because of the specific characteristics and the wide range of materials used in different construction projects. Large variations are observed in the methods used to predict the amount of waste generated because of the range of variables involved in construction processes and the different contexts in which these methods are employed. This paper proposes a statistical model to determine the amount of waste generated in the construction of high-rise buildings by assessing the influence of design process and production system, often mentioned as the major culprits behind the generation of waste in construction. Multiple regression was used to conduct a case study based on multiple sources of data of eighteen residential buildings. The resulting statistical model produced dependent (i.e. amount of waste generated) and independent variables associated with the design and the production system used. The best regression model obtained from the sample data resulted in an adjusted R(2) value of 0.694, which means that it predicts approximately 69% of the factors involved in the generation of waste in similar constructions. Most independent variables showed a low determination coefficient when assessed in isolation, which emphasizes the importance of assessing their joint influence on the response (dependent) variable. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  16. Measuring the effects of using ICT/BIM in construction projects

    DEFF Research Database (Denmark)

    Lambrecht, Jan Fuglsig; Vestergaard, Flemming; Karlshøj, Jan

    2016-01-01

    This paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects....... Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction...... projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case...

  17. Knowledge Discovery in Data in Construction Projects

    Directory of Open Access Journals (Sweden)

    Szelka J.

    2016-06-01

    Full Text Available Decision-making processes, including the ones related to ill-structured problems, are of considerable significance in the area of construction projects. Computer-aided inference under such conditions requires the employment of specific methods and tools (non-algorithmic ones, the best recognized and successfully used in practice represented by expert systems. The knowledge indispensable for such systems to perform inference is most frequently acquired directly from experts (through a dialogue: a domain expert - a knowledge engineer and from various source documents. Little is known, however, about the possibility of automating knowledge acquisition in this area and as a result, in practice it is scarcely ever used. It has to be noted that in numerous areas of management more and more attention is paid to the issue of acquiring knowledge from available data. What is known and successfully employed in the practice of aiding the decision-making is the different methods and tools. The paper attempts to select methods for knowledge discovery in data and presents possible ways of representing the acquired knowledge as well as sample tools (including programming ones, allowing for the use of this knowledge in the area under consideration.

  18. Unfavorable Communications Lead to Conflicts in Building Projects

    DEFF Research Database (Denmark)

    Ussing, Lene Faber; Wandahl, Søren

    2013-01-01

    The building industry in Denmark is accused of moving towards a conflict culture. The aim of this survey is, therefore, to investigate how the parties in the building industry experience this. The study answers the following two questions: Can unfavorable communications in a building project team...... of misunderstanding and conflicts depends on the way of communicating, and the degree of trust between the parties in a building project team depends on how familiar the parties are with each other. The results indicate that the building industry has to seek new ways of working together to obtain a better...... communication and more trust to each other....

  19. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  20. Research projects and capacity building | Breen | Water SA

    African Journals Online (AJOL)

    ... by capacity building in the context of research projects. Based on this interpretation, reasonable and unreasonable expectations with respect to the extent to which capacity building can be achieved within a given project duration are discussed. A model is suggested, which would improve understanding and delivery and ...

  1. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  2. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  3. Accident Causal Factors on the Building Construction Sites: A Review

    Directory of Open Access Journals (Sweden)

    Opeyemi Samuel Williams

    2018-01-01

    Full Text Available The concerns for cost, quality and timely delivery of projects have been in existence from time immemorial, whereas the passion for these should be extended to safe execution of site works by the construction participants, as safety of life is very paramount. However, high level of commitment that is essential for the safe execution of site works has become a taboo. Hence, a plethora of accidents takes place on the site ranging from falls from height, contact with working tools, vehicle-related, slip and trip, collapse, exposure to harmful substances, to lifting and handling object accidents. It is pertinent to know that, responsibility for accidents on site cuts across all project participants (clients, consultants, contractors, workers, as well as the construction site environment. Recognition of the construction participants and site environmental factors as agents of accident is the focus of this research. Through extensive review of literature, a copious number of factors were identified and subsequently grouped under five factors as client-related, consultant-related, contractor-related, construction workers-related, and construction site-related. However, there has been a dearth of research in the grouping of accident contributing factors. The identification and understanding of these factors will go a long way in mitigating construction accidents, coupled with proven measures taken in positively addressing them. Efforts to prevent these causative factors include inter alia elimination of hazards from design, effective safety management, adequate planning of activities and employment of seasoned professionals by the client. The contractors are to embark on staff safety auditing, set up safety committees, conduct regular training for staff, use innovative technology, uphold housekeeping and report accident occurrence, while strict adherence to safety regulations must be adopted by all construction operatives.

  4. Innovation in Management of Primary School Construction: Multi-Purpose Primary School Buildings in Bangladesh. Educational Building Report 18.

    Science.gov (United States)

    Constantinos, Fecadu

    This report deals with school building construction utilizing technology carried out by the Lutheran World Service/Rangpur Dinajpur Rehabilitation Service in Bangladesh. The purpose was to develop an alternative design for primary school constructions. The design, construction, and multipurpose use of the school buildings are described. Appended…

  5. Factors contributing to the waste generation in building projects of Pakistan

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.

    2016-01-01

    Generation of construction waste is a worldwide issue that concerns not only governments but also the building actors involved in construction industry. For developing countries like Pakistan, rising levels of waste generation, due to the rapid growth of towns and cities have become critical issue. Therefore this study is aimed to detect the factors, which are the main causes of construction waste generation. Questionnaire survey has been conducted to achieve this task and RIW (Relative Importance Weight) method has been used to analyze the results of this study. The important factors contributing to the generation of construction as identified in this study are: frequent changes/ revision in design during construction process; poor scheduling; unavailability of storage; poor workmanship; poor layout; inefficient planning and scheduling of resources and lack of coordination among supervision staff deployed at site. Based on the identified factors, the study also has presented some suggestions for the reduction of construction waste in building construction projects of Pakistan. (author)

  6. Innovative Organization of Project Activity of Construction Students

    Science.gov (United States)

    Stolbova, I. D.; Aleksandrova, E. P.; Krainova, M. N.

    2017-11-01

    The construction industry competitiveness depends on its equipping with information modeling technologies. This requires training and development of human resources. The advantages of BIM-technologies are considered. The requirements for the specialists capable of promoting information modeling technologies in the construction industry are discussed. For a wide application of BIM-technologies, the problem of training personnel with a new thinking must be solved. When preparing graduates of the major “Construction”, it is necessary to introduce innovative educational technologies aimed at building the students’ ability for team work, competences in the field of modern information and communication technologies, as well as design skills basing on spatial modeling. Graphic training is the first discipline of the professional orientation for construction students. In the context of training it is important to create such learning environment that is close to a professional one. The paper provides the examples of practice-oriented assignments based on the project method in the course of students’ independent work.

  7. The repetition effect in building and construction works

    DEFF Research Database (Denmark)

    Gottlieb, Stefan Christoffer; Haugbølle, Kim

    are then applied on the Public Transport Authorities' main account structure of units and costs, and a method for assessing the possibilities of achieving effects of repetition for each account is described. Finally, the report summarises the core conditions necessary to take into consideration in relation......This report summarises the results from the work undertaken for the Public Transport Authority on the effect of learning and repetition in building and construction works. The results are applied by the Public Transport Authority in a new budgeting model, while the agency investigates...

  8. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    Science.gov (United States)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  9. Environmental labelling of buildings and construction products: lessons for South Africa from global trends

    CSIR Research Space (South Africa)

    Ampofo-Anti, NL

    2012-07-01

    Full Text Available be informed by life cycle considerations. Environmental labelling in construction takes the form of whole building rating systems and construction product certification programmes. The First Generation building rating systems have to date experienced much...

  10. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  11. Knowledge Sharing Strategies for Large Complex Building Projects.

    Directory of Open Access Journals (Sweden)

    Esra Bektas

    2013-06-01

    Full Text Available The construction industry is a project-based sector with a myriad of actors such as architects, construction companies, consultants, producers of building materials (Anumba et al., 2005. The interaction between the project partners is often quite limited, which leads to insufficient knowledge sharing during the project and knowledge being unavailable for reuse (Fruchter et al. 2002. The result can be a considerable amount of extra work, delays and cost overruns. Design outcomes that are supposed to function as boundary objects across different disciplines can lead to misinterpretation of requirements, project content and objectives. In this research, knowledge is seen as resulting from social interactions; knowledge resides in communities and it is generated through social relationships (Wenger 1998, Olsson et al. 2008. Knowledge is often tacit, intangible and context-dependent and it is articulated in the changing responsibilities, roles, attitudes and values that are present in the work environment (Bresnen et al., 2003. In a project environment, knowledge enables individuals to solve problems, take decisions, and apply these decisions to actions. In order to achieve a shared understanding and minimize the misunderstanding and misinterpretations among project actors, it is necessary to share knowledge (Fong 2003. Sharing knowledge is particularly crucial in large complex building projects (LCBPs in order to accelerate the building process, improve architectural quality and prevent mistakes or undesirable results. However, knowledge sharing is often hampered through professional or organizational boundaries or contractual concerns. When knowledge is seen as an organizational asset, there is little willingness among project organizations to share their knowledge. Individual people may recognize the need to promote knowledge sharing throughout the project, but typically there is no deliberate strategy agreed by all project partners to address

  12. Causes of Low-Skilled Workers’ Performance in Construction Projects

    OpenAIRE

    Alhaji Ali Zannah; Aryani Ahmad Latiffi; Abdulazeez Umar Raji; Abdullahi Abba Waziri; Usman Mohammed 4

    2017-01-01

    Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achie...

  13. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  14. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  15. Implementation of building information modeling in Malaysian construction industry

    Science.gov (United States)

    Memon, Aftab Hameed; Rahman, Ismail Abdul; Harman, Nur Melly Edora

    2014-10-01

    This study has assessed the implementation level of Building Information Modeling (BIM) in the construction industry of Malaysia. It also investigated several computer software packages facilitating BIM and challenges affecting its implementation. Data collection for this study was carried out using questionnaire survey among the construction practitioners. 95 completed forms of questionnaire received against 150 distributed questionnaire sets from consultant, contractor and client organizations were analyzed statistically. Analysis findings indicated that the level of implementation of BIM in the construction industry of Malaysia is very low. Average index method employed to assess the effectiveness of various software packages of BIM highlighted that Bentley construction, AutoCAD and ArchiCAD are three most popular and effective software packages. Major challenges to BIM implementation are it requires enhanced collaboration, add work to a designer, interoperability and needs enhanced collaboration. For improving the level of implementing BIM in Malaysian industry, it is recommended that a flexible training program of BIM for all practitioners must be created.

  16. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  17. Client's Constraining Factors to Construction Project Management

    African Journals Online (AJOL)

    factors as a significant system that constrains project management success of public and ... finance for the project and prompt payment for work executed; clients .... consideration of the loading patterns of these variables, the major factor is ...

  18. Assessing the influence of project management on quality during the early phases of construction projects

    Directory of Open Access Journals (Sweden)

    Ljevo Žanesa

    2018-12-01

    Full Text Available Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM processes that directly affect the quality of the delivered product (constructed building. This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives in terms of the indicators of quality of the delivered product. All par­ticipants, regardless of managerial perspective, believe that the most important indicator of the quality of prod­ucts for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046% of the basic set of vari­ables.

  19. Democracy Project: Building Citizenship through Schools | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Citizenship education in schools is a powerful tool to build people's ability to demand recognition of their ... and foster debate on strengthening democracy and citizenship through school education. ... Inclusive growth: Buzzword or innovation?

  20. Democracy Project: Building Citizenship through Schools | CRDI ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    , and ... materials and teachers' training modules on citizenship education. ... and the political class, frail government institutions, high social unrest, corruption, and ... Citizenship education in schools is a powerful tool to build people's ability to ...

  1. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  2. Building for a post-fossil era. Sustainable construction and operation of buildings; Bauen fuer die nachfossile Aera. Nachhaltiges Bauen und Betreiben von Gebaeuden

    Energy Technology Data Exchange (ETDEWEB)

    Daniels, Klaus [HL Beratungs- und Beteiligungs GmbH, Muenchen (Germany)

    2009-07-01

    The challenges of the 21st century will mostly be the result of the exploding world population, i.e. increasing instability because of the unequal distribution of wealth, fights over raw materials that are getting scarce, and the destruction of our natural resources. Increasingly, decision-makers are getting aware of the problems. This has consequences also for the process of building construction. For example, sustainability will be given greater attention in projecting and operation of buildings. (orig.)

  3. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  4. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  5. Overview of the ITER Tokamak complex building and integration of plant systems toward construction

    Energy Technology Data Exchange (ETDEWEB)

    Cordier, Jean-Jacques, E-mail: jean-jacques.cordier@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Bak, Joo-Shik [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Baudry, Alain [Engage Consortium, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Benchikhoune, Magali [Fusion For Energy (F4E), c/ Josep Pla, n.2, Torres Diagonal Litoral, E-08019 Barcelona (Spain); Carafa, Leontin; Chiocchio, Stefano [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Darbour, Romaric [Fusion For Energy (F4E), c/ Josep Pla, n.2, Torres Diagonal Litoral, E-08019 Barcelona (Spain); Elbez, Joelle; Di Giuseppe, Giovanni; Iwata, Yasuhiro; Jeannoutot, Thomas; Kotamaki, Miikka; Kuehn, Ingo; Lee, Andreas; Levesy, Bruno; Orlandi, Sergio [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Packer, Rachel [Engage Consortium, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Patisson, Laurent; Reich, Jens; Rigoni, Giuliano [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); and others

    2015-10-15

    The ITER Tokamak complex consists of Tokamak, diagnostic and tritium buildings. The Tokamak machine is located in the bioshield pit of the Tokamak building. Plant systems are implemented in the three buildings and are strongly interfacing with the Tokamak. The reference baseline (3D) configuration is a set of over 1000 models that today defines in an exhaustive way the overall layout of Tokamak and plant systems, needed for fixing the interfaces and to complete the construction design of the buildings. During the last two years, one of the main ITER challenges was to improve the maturity of the plant systems layout in order to confirm their integration in the building final design and freeze the interface definitions in-between the systems and to the buildings. The propagation of safety requirements in the design of the nuclear building like confinement, fire zoning and radiation shielding is of first priority. A major effort was placed by ITER Organization together with the European Domestic Agency (F4E) and the Architect Engineer as a joint team to fix the interfaces and the loading conditions to buildings. The most demanding systems in terms of interface definition are water cooling, cryogenic, detritiation, vacuum, cable trays and building services. All penetrations through the walls for piping, cables and other equipment have been defined, as well as all temporary openings needed for the installation phase. Project change requests (PCR) impacting the Tokamak complex buildings have been implemented in a tight allocated time schedule. The most demanding change was to implement a new design of the Tokamak basic machine supporting system. The 18 supporting columns of the cryostat (2001 baseline) were replaced at the end of 2012 by a concrete crown and radial concrete ribs linked to the basemat and to the bioshield surrounding the Tokamak. The change was implemented successfully in the building construction design to allow basemat construction phase being performed

  6. A financing model to solve financial barriers for implementing green building projects.

    Science.gov (United States)

    Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.

  7. A Financing Model to Solve Financial Barriers for Implementing Green Building Projects

    Science.gov (United States)

    Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379

  8. Decision-making in the Pre-design Stage of Sustainable Building Renovation Projects

    DEFF Research Database (Denmark)

    Gade, Anne Nørkjær; Jensen, Rasmus Lund; Larsen, Tine Steen

    2017-01-01

    There is a great potential in renovating our existing building stock, in terms of improving environmental, economic and social qualities. Meeting the increasing performance requirements for sustainable construction entails an increasing level of complexity in the design process of both new...... buildings and renovation projects. Decision support tools are one solution that can help the building owner manage this complexity. This study investigates the current decision-making processes among Danish professional building owners, in order to propose a conceptual framework for future decision support...... tools for sustainable renovation. Design Science Research Methodology has been used as the main methodological framework. Current practices for setting goals for sustainability, determining the current state of the buildings and prioritizing which buildings to renovate within a building portfolio, have...

  9. Continuous Briefing and User Participation in Building Projects

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    and the methods for user participation, identifies problem areas and point out possible improvements. The author has been actively involved in the project as deputy project director with re-sponsibility for the briefing process until spring 2005 and is now a researcher.......Briefing is not just about specifying needs as requirements but also about evaluating how well design pro-posals fulfill the needs and aspirations. Furthermore, briefing is not only about building design. Briefing starts at the pre-project stage to create a basis for the project decision...... into the building is required. A building project is often part of a change process of the organisation that is going to occupy the building, and this change process should be management carefully to reach a successful result. An important aspect of briefing is to manage the par-ticipation of the coming users...

  10. an appraisal of construction management practice in nigeria

    African Journals Online (AJOL)

    user

    Keywords: Construction Project, Management tools, Project delivery, Construction Industry, Nigeria. 1. ..... developing country” International Journal of Project. Management, Vol. 18, Number 3 ... Construction Industry Perspective”, Building &.

  11. Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

  12. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  13. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  14. Multy storey building project: Starlight Hotel

    OpenAIRE

    Vicarregui Guijarro, Pedro

    2016-01-01

    Following our client’s visions, we decided to build a multistory building which is going to fulfil all his requirements. The plot is located in Carl Klitgaards Vej 30, 9400 Nørresundby, next to the famous Limfjord and to the queen’s residence. This makes it suitable for a hotel because it will attract tourists from all over the world. The plot is placed 4 kilometres from the airport, which makes it comfortable for arriving foreign tourists. It is close to the city centre, which ...

  15. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  16. A review of BIM (Building Information Modeling) implementation in Indonesia construction industry

    Science.gov (United States)

    Suryadinata Telaga, Abdi

    2018-05-01

    Construction projects in Indonesia have been growing rapidly in the last three years. Therefore, construction management is very important to ensure completion of construction projects are within schedule and budget. Utilization of building information modeling (BIM) can increase the efficiency of a construction project. However, the implementation of BIM in Indonesia is still not known. This paper is intended to review the implementation of BIM in Indonesia through literature analysis. To find BIM articles in Indonesia, Firstly, searching was limited to English articles published in reputed journals or conferences. However the results were limited, then the search was expanded to the article using Indonesian languages that published in journal and conference. Based on the number of articles, the results showed that BIM research in Indonesia is still in a dearth. Furthermore, BIM study cases were conducted in a limited location and within a small population. Nevertheless, the literature shared the conclusion that BIM can increase project efficiency, but the implementation was hindered by high initial investment cost, inadequate human resources, small demand, and technology resistant. The research contributes to providing a current reported level of BIM implementation in Indonesia. In the future research to study of BIM implementation comprehensively in Indonesia is eminent.

  17. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  18. Adoption and Use of Interorganizational ICT in a Construction Project

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    The objective of this research is to explain why actors are not using interorganizational information and communication technology (ICT) in construction projects in the intended way, by determining the mechanisms that influence the way actors use this ICT over time during a construction project.

  19. Delay factors in failed construction projects in southwestern Nigeria ...

    African Journals Online (AJOL)

    This study was carried out with a view to showing the contribution of delay factors in the overall consideration of failed construction projects in south western Nigeria. This is considered necessary because the traditional view of construction project failure as consisting mainly of structural or functional failures tends to excuse ...

  20. Marginal Productivity Gained Through Prefabrication: Case Studies of Building Projects in Auckland

    Directory of Open Access Journals (Sweden)

    Wajiha Shahzad

    2015-02-01

    Full Text Available Several studies have documented benefits of prefabrication system (prefab compared to the traditional building system (TBS. However, the documented benefits have been anecdotal or fragmented with reports of isolated case study projects. Few studies have looked at the objectively quantified benefits from statistical significance point of view and across building types in New Zealand. This study contributes to filling this knowledge gap by analyzing cost and time-savings, and productivity improvement achievable by the use of prefab in place of the TBS. Records of completion times and final contract values of 66 building projects implemented using prefab in Auckland were collected. The building types included commercial, houses, apartments, educational, and community buildings. The project details included final contract sums, completion dates, gross floor areas, and number of floors. Based on these details, the equivalent completion times and the final cost estimates for similar buildings implemented using the TBS were obtained from the Rawlinsons construction data handbook and feedback from some designers and contractors. Marginal productivity outcome for each building project was computed as the product of the cost and time-savings achieved using the prefab. Results showed that the use of prefab in place of TBS resulted in 34% and 19% average reductions in the completion times and costs, respectively. This also translated to overall 7% average improvement in the productivity outcomes in the building projects. Univariate ANOVA-based hypothesis test results showed that ‘building type’ had no significant effects on the cost and productivity improvement outcomes, but had significant effect on the time savings analyzed in the case study projects. The greatest productivity gain of 11% was achieved in house projects. These evidence-based results could guide optimized use of prefab for specific building application. The hypothesis-testing outcome

  1. PRIVATE AND PUBLIC ENTERPRISE: FLETCHER CONSTRUCTION AND THE BUILDING OF NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Astrid Baker

    2002-01-01

    Full Text Available This paper shows how a New Zealand company, Fletcher Construction, created wealth in partnership with the state. The first Labour government was elected in 1935 with a firm commitment to full employment and a broad social security system. Because Labour’s determination to get things done through local industry coincided with James Fletcher’s, and then his son’s, drive for company expansion and profits. Fletchers’ design or construction of roads, wharves, saw-mills, flour mills, pulp mills, paper mills, factories, railway stations, university buildings, hospitals, department stores, office blocks, houses, and ownership and management of stone quarries, brickworks and forests, left a mark in almost every town and city in the country. Many projects required building methods and materials new to New Zealand, the innovative use of traditional materials, large-scale plant, specialist, skilled staff and technical know-how from United States and British construction and engineering firms. In this way Fletcher projects drew together many different suppliers, equipment makers, skilled tradesmen and financiers. As a provider of employment in construction and manufacturing, with easy access to established business and political leaders and a powerful influence on policy making, the company became a potent force in New Zealand’s full employment welfare state.

  2. Applications of building information model (BIM) in Malaysian construction industry

    Science.gov (United States)

    Tahir, M. M.; Haron, N. A.; Alias, A. H.; Al-Jumaa, A. T.; Muhammad, I. B.; Harun, A. N.

    2017-12-01

    Since the introduction of BIM in Malaysia in 2009, the technology adoption rate is slow when compared to other countries of the world. Most of the construction companies in Malaysia have an insight on the BIM concept but are yet to implement it in the management of their construction projects. By the year 2020, the Malaysian government will make BIM mandatory, this makes it important to carry out research on the possible applications of the technology. A qualitative method of enquiry was used for this study in Klang Valley using semistructured interview. The responses received were analysed using Principal component analysis (PCA). The result of the analysis showed that “quantity take-off and estimation”, “clash detection and coordination”, “integration and collaboration of stakeholders”, and “design and visualisation” as the main applications of BIM in Malaysia presently. The implication of this findings is that the Malaysian construction industry productivity is likely to increase to meet the demand of the population through the implementations of BIM. More also, BIM technology is regarded as the future of construction industry, which makes it very important for the industry.

  3. Constructing new working practices through project narratives

    NARCIS (Netherlands)

    Veenswijk, M.B.; Berendse, M.

    2008-01-01

    In this article we focus on the (internal and external) dynamics of New Public Management (NPM) in the daily life of project management. We concentrate on the ways NPM concepts work out in the realities of project actors. Based on recent research within the Dutch infrastructure sector, we analyse

  4. Expansive Learning in Construction Projects - a Contradiction in terms?

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Nissen, Søren Bülow; Beck, Frederikke

    2016-01-01

    This research is a preliminary study performed as part of a primary research into expansive learning in interorganizational network set up to solve a construction project. The construction industry has long had issues about productivity, which can be an indication of lack of learning. A case study...... acquisition and participation but not by expansive learning. The construction industry needs to accept that the learning generated from projects will be limited to learning by acquisition and participation. The interorganizational network cannot facilitate expansive learning while working on object......-fixed projects. Research in construction management fails to generate and document knowledge because of the limitations of case studies....

  5. Selective classification and quantification model of C&D waste from material resources consumed in residential building construction.

    Science.gov (United States)

    Mercader-Moyano, Pilar; Ramírez-de-Arellano-Agudo, Antonio

    2013-05-01

    The unfortunate economic situation involving Spain and the European Union is, among other factors, the result of intensive construction activity over recent years. The excessive consumption of natural resources, together with the impact caused by the uncontrolled dumping of untreated C&D waste in illegal landfills have caused environmental pollution and a deterioration of the landscape. The objective of this research was to generate a selective classification and quantification model of C&D waste based on the material resources consumed in the construction of residential buildings, either new or renovated, namely the Conventional Constructive Model (CCM). A practical example carried out on ten residential buildings in Seville, Spain, enabled the identification and quantification of the C&D waste generated in their construction and the origin of the waste, in terms of the building material from which it originated and its impact for every m(2) constructed. This model enables other researchers to establish comparisons between the various improvements proposed for the minimization of the environmental impact produced by building a CCM, new corrective measures to be proposed in future policies that regulate the production and management of C&D waste generated in construction from the design stage to the completion of the construction process, and the establishment of sustainable management for C&D waste and for the selection of materials for the construction on projected or renovated buildings.

  6. A Large Scale Problem Based Learning inter-European Student Satellite Construction Project

    DEFF Research Database (Denmark)

    Nielsen, Jens Frederik Dalsgaard; Alminde, Lars; Bisgaard, Morten

    2006-01-01

    that electronic communication technology was vital within the project. Additionally the SSETI EXPRESS project implied the following problems it didn’t fit to a standard semester - 18 months for the satellite project compared to 5/6 months for a “normal” semester project. difficulties in integrating the tasks......A LARGE SCALE PROBLEM BASED LEARNING INTER-EUROPEAN STUDENT SATELLITE CONSTRUCTION PROJECT This paper describes the pedagogical outcome of a large scale PBL experiment. ESA (European Space Agency) Education Office launched January 2004 an ambitious project: Let students from all over Europe build....... The satellite was successfully launched on October 27th 2005 (http://www.express.space.aau.dk). The project was a student driven project with student project responsibility adding at lot of international experiences and project management skills to the outcome of more traditional one semester, single group...

  7. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  8. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  9. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  10. Assessment of Carbon Emission Reduction for Buildings Projects in Malaysia-A Comparative Analysis

    Directory of Open Access Journals (Sweden)

    Klufallah Mustafa M. A.

    2014-01-01

    Full Text Available The Malaysian construction industry significantly contributes as an empowerment to its development vision of 2020 by reducing 40% of carbon emission. Moreover, this industry accounts as a threat to the environment, not only in terms of consumption of natural resources but also in emitting million tons of carbon emission annually. In fact, Malaysia is categorized the 30th in the world's ranking in carbon emission level. To mitigate the raise of carbon emission level from the buildings construction, several studies identified some of the effective carbon emission assessment tools for construction projects but it is lack of implementation in Malaysia. The green building index (GBI, Malaysian CIB Report has been introduced to assist the construction stakeholders in reducing the level of carbon emission and the impact of buildings on the environment. This paper presents an analysis of carbon emission from housing projects and office buildings in order to identify and quantify the main sources of carbon emission for each project and it proposes environmental friendly materials as replacement for conventional construction materials to achieve the implementation of sustainability in Malaysia.

  11. Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds

    Science.gov (United States)

    Information about the SFBWQP Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquat

  12. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  13. How an EAM solution could support a new build project?

    International Nuclear Information System (INIS)

    Luanco, E.

    2008-01-01

    In the context of the nuclear renaissance, the purpose of this paper is to address from an Enterprise Asset Management system (EAM) prospective the business needs of all the main stake holders of a new NPP? These are the Architect Engineers AE, the EPC and the future operator of a new NPP? It also covers the regulatory and asset life cycle management aspects of such a project. Besides meeting the US specific 10CFR part 52 requirements of the new combine construction and operating license (COL) process, we will review the generic ones which needs be satisfied no matter the country where this new build project is taking place. It also covers plant life cycle considerations with regards of the key information generated by the plant constructors and design providers which are of importance to the future NPP operators. All these requirements bring their own lot of issues that an appropriate EAM solution could address. Ventyx (formerly Indus International), is a nuclear EAM solutions provider for the passed 30 years and its solution used all over the world. This paper will review these requirements which could easily be supported by such a solution and review its potential key benefits it could bring to all involved parties. (authors)

  14. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  15. Build Artifacts in Sustainable Urban Projects

    DEFF Research Database (Denmark)

    Pinheiro-Croisel, Rebecca; Hernes, Tor

    2015-01-01

    This paper explores innovation and social behaviourist theory in relation to sustainable urban projects in the highly institutionalized public sector (towns). Using empirical data from France, we examine the dynamics of a design process in which unexpected practices generated innovative urban...... into a movement of collective action, which presupposed the acquisition of a new identity. Ultimately, our objective is to combine social behaviourist theory and innovation theory and to facilitate innovative design in urban projects....

  16. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  17. EVALUATION OF WOOD PERFORMANCE IN BUILDING CONSTRUCTION THROUGH SYSTEM APPROACH

    Directory of Open Access Journals (Sweden)

    Ricardo Pedreschi

    2005-09-01

    Full Text Available Building construction is considered to be the leading market for the wood industry, in developed and developingcountries. The greatest amount of wood produced in Brazil is consumed as firewood and energy, followed by production of celluloseand third as machined wood. The use of wood from planted forests can be increased. This would lead to a better use of naturalresources, and consequently to an increased sustainability of forest activity in many regions of the country. The performance of woodcan be observed from many different insights: symbolic performance, technical performance and economical performance, conductedby the method of systems approach to architecture. Usages of wood related to the performances of the material, with the redefinitionof parameters of use, elaborating a new culture linked to new technologies were outlined. This work diagnosed the usage of wood inbuilding construction based in system analysis. Through an opinion research related to the acceptation of the use of wood we observethe possibilities of utilization according to physical and mechanical proprieties, aesthetics and appearance performance and postoccupation.According to the results obtained related to the culture and knowledge about the use of wood from planted forest, it canconclude that there is not enough knowledge in this area, and it is, therefore, necessary to create an information system forprofessionals and for people in general.

  18. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  19. Impact of Construction Health & Safety Regulations on Project ...

    African Journals Online (AJOL)

    Impact of Construction Health & Safety Regulations on Project Parameters in Nigeria: Consultants and Contractors View. ... The study recommends that better attention is given to health and safety should as a project parameter and that related practice notes and guidelines should be evolved for all project stakeholders.

  20. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  1. Building a Uranium Heap Leach Project

    International Nuclear Information System (INIS)

    Schnell, Henry

    2014-01-01

    Despite all these we have seen many HL successes and many interesting projects coming down the pipe. • Previous experience in Uranium with previous ROM projects in France (Bessines, Langone), Niger (Somair), Canada (Agnew Lake) and other locations had provided some basic background. • Heap leach based on copper experience with crushed ore has operated for many years in Brazil (Caetite). • Many gold operations for many decades in all climates and continents. • Copper at +20% of production, many in Chile, but also now in many other countries. • Uranium with agglomerated crushed ores is now becoming more prominent – Somair, Imouraren, Trekkopje. • Work also ongoing for Ranger, Rossing, and in consideration for other projects. • Other notable work in Nickel, and multi-metal such as Talvivaara

  2. Evaluation of Ventilation Strategies in New Construction Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, S. [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States); Berger, D. [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States); Zuluaga, M. [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2014-07-01

    In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the "fresh" air is coming from is gaining significance as air-tightness standards for enclosures become more stringent. CARB researchers have found that most new high performance, multifamily housing in the Northeast use one of four strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unit HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. Insufficient information is available to designers on how these various systems are best applied. Product performance data are based on laboratory tests, but there is no guarantee that those conditions will exist consistently in the finished building. In this research project, CARB evaluated the four ventilation strategies in the field to validate system performance.

  3. Relations between constructive peculiarities and structural behavior in Venice buildings

    Directory of Open Access Journals (Sweden)

    Doglioni, F.

    2012-12-01

    Full Text Available Here we are synthetically describing some constructive peculiarities of Venice civil buildings, analyzing the relation with the features of their structural decay and behavior in the long run. We suppose Venetian buildings, especially those parts which are conceived to suit the lagoon environment, to have undergone an evolution made of some adjustments, which were based on the observation of damages in previous buildings. That is we suppose ancient builders to rely on their awareness of the behavior of structures yet to come, and to be able to forecast it in part. This process brought some building contrivances to perfection, as exclusive and enduring features of Venice, overcoming changes in style and architectural layout, till they grew into essential elements of a whole and adaptable “device”. This writing is meant for a concise interpretation of this device, which is the result of some research works carried out at Venice IUAV University.

    En este texto, se describen sintéticamente algunas peculiaridades de la edificación residencial de Venecia, analizando su relación con el abanico de problemas estructurales que caracterizan el comportamiento estructural del edificio a lo largo del tiempo. Se aventura la hipótesis que las construcciones venecianas y, en particular, algunos de sus detalles, concebidos específicamente para la laguna donde se enclava, han sido objeto de una adaptación evolutiva a través de la observación de los problemas estructurales de los edificios precedentes. Los alarifes venecianos aprendieron a tener en cuenta el comportamiento estructural posterior del edificio, que previeron en cierta medida. Este proceso ha llevado a perfeccionar algunos detalles constructivos exclusivos de Venecia que han perdurado en el tiempo, que han resistido impertérritos a mutaciones de estilo y de configuración arquitectónica, hasta constituir elementos esenciales de un aparato indivisible y adaptable cuya interpretaci

  4. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  5. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  6. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  7. An Architecture Design Project: "Building" Understanding

    Science.gov (United States)

    Bush, Sarah B.; Albanese, Judith; Karp, Karen S.; Karp, Matthew

    2017-01-01

    Middle school students need relevant, meaningful contexts to apply emerging mathematical ideas. In this project, through the context of an architecture investigation, seventh-grade students engaged in mathematics involving area, surface area, volume, ratios and proportional thinking, number sense, and technology integration. Students, working in…

  8. Project BASIC: Building Art Systems into Curriculum.

    Science.gov (United States)

    Benson, Cal; Doane, Mitzi

    1982-01-01

    Describes Duluth, Minnesota's interdisciplinary program, Project BASIC, which incorporates five major art forms into the elementary curriculum. Schools employ artists-in-residence and in-service training to expand teacher use of arts in the classroom. Results of a research study to measure gains in self-concept and creativity are included. (AM)

  9. Economic Analysis of USN-Based Data Acquisition Systems in Tall Building Construction

    Directory of Open Access Journals (Sweden)

    Hyunsu Lim

    2017-08-01

    Full Text Available The successful construction of tall buildings requires effective construction management based on various quantitative data. The recent development of ubiquitous sensor networks (USNs enables massive amounts of data to be collected in real-time. However, the application of USN-based data acquisition systems to repetitive tasks on typical floors of tall buildings can be inefficient, because this may involve the repetitive reinstallation of sensors and the repositioning of data loggers and routers to enable continuous data transfer. To minimize this cumbersome work, a modified data acquisition method using reusable sensor nodes and mobile devices can be a useful solution. This study analyzes the economic aspects of the USN-based systems for concrete temperature monitoring by using the activity-based costing technique. The case study shows that the modified system can reduce the process cost by about 19%. It can also reduce the resource input time of management by about 55%, freeing up time for other management activities. Moreover, the cost benefits should scale up as projects increasingly require more measurement and monitoring. This study should facilitate the application of USN-based information management systems, particularly for tall building construction.

  10. New projects in the ZGS buildings

    International Nuclear Information System (INIS)

    Brumwell, F.R.

    1996-01-01

    What the author proposes to do is to conduct a walk through the buildings and show a number of pictures of the activities, both old and new. The people who stayed at Argonne turned to new tasks so that the organization continued to be productive. The ZGS buildings did not stand empty, but were used in a variety of new programs reflecting the wide capability and ingenuity of the Argonne staff. Three conclusions can be drawn from this tour. The first is that the termination of a program like the ZGS has an up as well as a down side; it provides resources and opportunities for work in new research areas. The second is the contribution that the assets of the terminated program make to the continuation of the Laboratory. The ZGS facilities were able to serve a variety of new Argonne programs. Finally, everything depends on having a staff of people who can see and exploit unique opportunities to further the US R and D activities

  11. Impossible Geometric Constructions: A Calculus Writing Project

    Science.gov (United States)

    Awtrey, Chad

    2013-01-01

    This article discusses a writing project that offers students the opportunity to solve one of the most famous geometric problems of Greek antiquity; namely, the impossibility of trisecting the angle [pi]/3. Along the way, students study the history of Greek geometry problems as well as the life and achievements of Carl Friedrich Gauss. Included is…

  12. CLAIMS IN INTERNATIONAL CONSTRUCTION PROJECTS IN ...

    African Journals Online (AJOL)

    The most significant effect-of claims in international projects in Ethiopia has ... however, do not accept the decision of the Engineer, then an .... The original design of the roof framing for the ..... have experienced tIus problem making it a prime.

  13. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  14. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  15. Solar Heating/Cooling of Buildings: Current Building Community Projects. An Interim Report.

    Science.gov (United States)

    National Academy of Sciences - National Research Council, Washington, DC. Building Research Advisory Board.

    Projects being carried out by the private sector involving the use of solar energy for heating and cooling buildings are profiled in this report. A substantial portion of the data were collected from a broad cross-section of the building community. Data collection efforts also involved the canvassing of the nearly 200 trade and professional…

  16. Portfolio management for investment projects in the construction industry

    Directory of Open Access Journals (Sweden)

    Kozlov Alexander

    2017-01-01

    Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.

  17. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  18. Ergo project builds up to full production

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The East Rand Gold and Uranium Company (Ergo) - planned on a massive scale to recover gold, uranium and sulphuric acid from the slimes dams of the East Rand - captured imaginations both from a financial and a technical viewpoint. Operationally, the commissioning of the project is now well under way and satisfying profits have already been recorded. A broad look at the background and the design is given

  19. Ergo project builds up to full production

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The East Rand Gold and Uranium Company (ERGO) - planned on a massive scale to recover gold, uranium and sulphuric acid from the slimes dams of the East Rand - captured imaginations both from a financial and a technical viewpoint. Operationally, the commissioning of the project is now well under way and satisfying profits have already been recorded. A broad look at the background and the design is given

  20. Analysis of Building Envelope Construction in 2003 CBECS

    Energy Technology Data Exchange (ETDEWEB)

    Winiarski, David W.; Halverson, Mark A.; Jiang, Wei

    2007-06-01

    The purpose of this analysis is to determine "typical" building envelope characteristics for buildings built after 1980. We address three envelope components in this paper - roofs, walls, and window area. These typical building envelope characteristics were used in the development of DOE’s Reference Buildings .

  1. Management of metrology in measuring of the displacement of building construction

    Directory of Open Access Journals (Sweden)

    Jiří Kratochvíl

    2007-06-01

    Full Text Available The metrology management of the measurement of the displacement of building construction is not regulated in the standard ČSN ISO 73 0405 - Measurement of the displacement of building construction. But the metrology management has to be included in the project of measurement of the displacement (Stage of project. Then we have to pay an attention to the metrological management during this measurement (Stage of realization and during the evaluation of this measurement (Stage of evaluation. We have to insist on the subsequent improving of metrology management within the frame of the next project (so-called feedback. The metrology management in the measurement of the displacement during the stages should be based on an application of statutory instruments and technical standards. We should insist especially on the system of standards for the quality control ISO 9000. Considering specialities of geodetic measurements it is necessary to adapt the metrology management. That is why it will differ from the metrology management in other fields of knowledge. This paper includes some steps of metrological provision which must not be ignored.

  2. How can new technology, improve façade construction of office building, in Iran

    OpenAIRE

    Saberi, Akbar

    2014-01-01

    It is evident that available technologies on office building sector in Shiraz relay on traditional construction especially on wet methods. Wet system process depends on human interpretation (The human interpretation is the basics of the systems) which cause major problems in construction quality. For this propose this dissertation focus on construction method in office building in Iran. Compared to wet construction, dry system is new technology in the construction industry. ...

  3. Exploring delay causes of road construction projects in

    Directory of Open Access Journals (Sweden)

    Remon F. Aziz

    2016-06-01

    Full Text Available Construction delays are a common phenomenon in civil engineering projects in Egypt including road construction projects. Therefore, it is essential to study and analyze causes of road construction delays. This paper studied a list of construction delay causes gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes and delay groups. A questionnaire and personal interviews have formed the basis of this paper listing 293 delay causes. The questionnaire survey was distributed to 500 construction participants and 389 were received who represent consultants, contractors and site/design engineers excluding the owner representing the government in road projects as one party only. Relative Importance Index (RII is calculated and according to the highest values the top twenty and the least twenty delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the paper. The test results reveal good correlation of causes and groups between contractors and site/design engineers and between consultants and site design engineers and a somewhat low correlation between contractors and consultants. So there are no root causes that can be taking for granted to be most or least effective delay causes. Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model. According to the analysis of case study, the most contributing causes and groups to delays were discussed, and some future recommendations were proposed in order to control and minimize delays in road construction projects. These findings can be helpful for project managers to mitigate the road construction delays in Egypt. In order to effectively overcome the road construction delays in developing countries, suggestions are made for fundamental and large

  4. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  5. Base Isolation for Seismic Retrofitting of a Multiple Building Structure: Design, Construction, and Assessment

    Directory of Open Access Journals (Sweden)

    Massimiliano Ferraioli

    2017-01-01

    Full Text Available The paper deals with the seismic retrofit of a multiple building structure belonging to the Hospital Centre of Avellino (Italy. At first, the paper presents the preliminary investigations, the in situ measurements and laboratory tests, and the seismic assessment of the existing fixed-base structures. Having studied different strategies, base isolation proved to be the more appropriate, also for the possibility offered by the geometry of the building to easily create an isolation interface at the ground level. The paper presents the design project, the construction process, and the details of the isolation intervention. Some specific issues of base isolation for seismic retrofitting of multiple building structures were lightened. Finally, the seismic assessment of the base-isolated building was carried out. The seismic response was evaluated through nonlinear time-history analysis, using the well-known Bouc-Wen model as the constitutive law of the isolation bearings. For reliable dynamic analyses, a suite of natural accelerograms compatible with acceleration spectra of Italian Code was first selected and then applied along both horizontal directions. The results were finally used to address some of the critical issues of the seismic response of the base-isolated multiple building structure: accidental torsional effects and potential poundings during strong earthquakes.

  6. Construction Project Leadership from the Perspective of Islam

    Directory of Open Access Journals (Sweden)

    MUHAMAD ROSDI SENAM

    2014-12-01

    Full Text Available Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project management literature calls for more project leadership research as leadership now is increasingly recognised as project success factor. Ethical dilemma and leadership crisis facing the project managers and business organisations reveals the shortcomings and inadequacies of the conventional non-Islamic leadership that is believed to be or that has not fully considered the religious, spiritual, moral and ethical dimensions. Examples of these theories of leadership are authentic leadership, servant leadership and ethical leadership. Therefore, recent trend from literature has implicitly suggested a new form of leadership for construction project manager which is spiritual, moral, values and ethical form of leadership. The uniqueness of Islam is that it does not separate religion and other aspects of human life activities. Construction and project activities are part of the whole economic and social transactions of a nation and thus it is part of Islam. Project management in particular leadership awaits divine intervention that is tied to God consciousness and accords with values and principles prescribed in the Quran and Sunnah. This research is intended to overcome the spiritual and religious shortcomings of the present leadership models by proposing an Islamic perspective of leadership for construction project manager.

  7. Construction of hydroelectric project generation: Focuses of the option value

    International Nuclear Information System (INIS)

    Villegas P, Clara Ines

    2002-01-01

    Work present work aims at the development of an analysis, that using the option value approach allows finding the optimal moment (from the environmental point of view), for the construction of an electrical project generation in a zone with determined environmental characteristics. The construction of the project, constitutes an irreversible decision and with uncertainty associated. The evolution of the environmental damage of the zone can be attracting through the variable C of environmental damage. The analysis developed here allows the characterization of a rule (or a barrier of environmental damage called C, which determines when, is optimal to construct the generation project or to conserve the ecosystems of the zone of location. Over this barrier, the construction of the project becomes optimal and below her the conservation of the ecosystems of the zone is privileged

  8. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  9. Facilitating value creation and delivery in construction projects via front-end loading

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2008-01-01

    -struction phase of the building projects. However it is in the early design phase that client value is established and the scene is set for everything that follows. Productivity in the construction phase is strongly dependent on performance of the design team and real client value will not be achieved...... if the building design does not meet client expectations (understanding the client as a wide range of stakeholders). Therefore a holistic view of the building process should be applied with a greater focus on the design phase and value creation. In Denmark a consulting engineering company has together...... with a major contractor developed a value based work-shop model that seeks to capture client values and manage the subsequent stages of the building process within a Lean framework striving to maximize value and reduce waste. This paper reports the initial findings of a joint research project between academic...

  10. Building America Case Study: Evaluation of Passive Vents in New-Construction Multifamily Buildings, New York, New York

    Energy Technology Data Exchange (ETDEWEB)

    2015-10-15

    Exhaust ventilation and corresponding outdoor air strategies are being implemented in high-performance new construction multifamily buildings to meet program or code requirements for improved indoor air quality, but a lack of clear design guidance is resulting in poor performance of these systems despite the best intentions of the programs or standards. CARB's 2014 'Evaluation of Ventilation Strategies in New Construction Multifamily Buildings' consistently demonstrated that commonly used outdoor air strategies are not performing as expected. Of the four strategies evaluated in 2014, the exhaust ventilation system that relied on outdoor air from a pressurized corridor was ruled out as a potential best practice due to its conflict with meeting requirements within most fire codes. Outdoor air that is ducted directly to the apartments was a strategy determined to have the highest likelihood of success, but with higher first costs and operating costs. Outdoor air through space conditioning systems was also determined to have good performance potential, with proper design and execution. The fourth strategy, passive systems, was identified as the least expensive option for providing outdoor air directly to apartments, with respect to both first costs and operating costs. However, little is known about how they actually perform in real-world conditions or how to implement them effectively. Based on the lack of data available on the performance of these low-cost systems and their frequent use in the high-performance building programs that require a provision for outdoor air, this research project sought to further evaluate the performance of passive vents.

  11. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  12. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  13. Engineer, procure, construct (EPC) for nuclear projects in OPG

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, M. [Ontario Power Generation, Toronto, Ontario (Canada)

    2011-07-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  14. Engineer, procure, construct (EPC) for nuclear projects in OPG

    International Nuclear Information System (INIS)

    Elliott, M.

    2011-01-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  15. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  16. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  17. Building on the Orange river project

    International Nuclear Information System (INIS)

    Skinner, J.

    1999-01-01

    The life of the World Commission on Dams (WCD) is due to end in mid-2000. In order to achieve its objective of making recommendations on the environmental, social, economic and institutional questions on dams, it will conduct up to ten case studies where the dams and river basins have been selected according to their age, function, regional representation and the lessons to be learned. The Orange River project in South Africa is being used as a pilot study for the other case studies and the reactions to the study are discussed. The case studies will focus on planning, implementation and operation of the dams with respect to their river basins. Six questions are listed and these will need to be answered to form a basis for a structured approach. To date, stakeholder meetings and fieldwork have highlighted four common generic difficulties and these are listed. A form for completion by interested parties was included with the article. (UK)

  18. Ranking of delay factors in construction projects after Egyptian revolution

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Time is one of the major considerations throughout project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Time delay is a very frequent phenomenon and is almost associated with nearly all constructing projects. However, little effort has been made to curtail the phenomenon, this research work attempts to identify, investigate, and rank factors perceived to affect delays in the Egyptian construction projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, researcher invited practitioners and experts, comprising a statistically representative sample to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of delay factors were identified in construction projects. Totally, ninety-nine (99 factors were short-listed to be made part of the questionnaire survey and were identified and categorized into nine (9 major categories. The survey was conducted with experts and representatives from private, public, and local general construction firms. The data were analyzed using Relative Importance Index (RII, ranking and simple percentages. Ranking of factors and categories was demonstrated according to their importance level on delay, especially after 25/1/2011 (Egyptian revolution. According to the case study results, the most contributing factors and categories (those need attention to delays were discussed, and some recommendations were made in order to minimize and control delays in construction projects. Also, this paper can serve as a guide for all construction parties with effective management in construction projects to achieve a competitive level of quality and a time effective project.

  19. Building a Roll-Off Roof Observatory A Complete Guide for Design and Construction

    CERN Document Server

    Hicks, John

    2009-01-01

    Almost every practical astronomer who takes the pursuit to its second level aspires to a fixed, permanent housing for his telescope, permitting its rapid and comfortable use and avoiding hours of setting-up time for each observing session. A roll-off roof observatory is the simplest and by far the most popular observatory design for today’s practical astronomers. Building a Roll-off Roof Observatory will help you decide whether to embark on the venture and will certainly provoke your enthusiasm for the project. The author, both an amateur astronomer and professional landscape architect, answers many of the common questions asked around observatory construction covering the following topics: Site planning, zoning, and by-law requirements common to most states, towns and municipalities Opportunities for locating the observatory Tailoring the observatory for your particular use Tools and structural components required to build it Variations in footing design to suit your soil conditions Variations possible in ...

  20. Overview of Building Information Modelling (BIM) adoption factors for construction organisations

    Science.gov (United States)

    Mohammad, W. N. S. Wan; Abdullah, M. R.; Ismail, S.; Takim, R.

    2018-04-01

    Improvement and innovation in building visualization, project coordination and communication are the major benefits generated by Building Information Modelling (BIM) for construction organisations. Thus, as many firms across the world would adopt BIM, however they do not know the clear direction in which path they are moving as there is no specific reference available for them to refer to. Hence, the paper seeks to identify the factors of BIM adoption from previous research. The methodology used in this paper is based on literature review from various sources such as conference articles and journals. Then, the findings were analysed using content analysis. The findings show that there are 24 factors found from literature that influence the adoption of BIM and four (4) factors such as vendor, organisational vision, knowledge, and implementation plan are among the least factors mentioned by previous researchers.

  1. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  2. Alignment between ICT and communication in construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2004-01-01

    Through rapid advancements in ICT, opportunities arise in enhancing communication between participants of different organisations in construction projects. The use of ICT in construction is, however, relatively limited and ineffective compared to other sectors such as the automotive or the aerospace

  3. Model for setting priority construction project objectives aligned with ...

    African Journals Online (AJOL)

    participants, including contractors, quantity surveyors, project managers, architects, and ..... (2004: 1) report that the global construction industry is plagued with ..... 1.2. Construction consultant/Developer. 2. 1.2. Engineering. 2. 1.2. Logistics. 2. 1.2 ...... supplychain/PPPFA%20-%20media.pdf> [Accessed: 2 June 2011].

  4. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section on establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.

  5. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  6. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  7. Construction Management: Building Schools Faster in the International Marketplace

    Science.gov (United States)

    Scarano, Joseph J.

    1976-01-01

    Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)

  8. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  9. Flammability tests for regulation of building and construction materials

    Science.gov (United States)

    K. Sumathipala

    2006-01-01

    The regulation of building materials and products for flammability is critical to ensure the safety of occupants in buildings and other structures. The involvement of exposed building materials and products in fires resulting in the loss of human life often spurs an increase in regulation and new test methods to address the problem. Flammability tests range from those...

  10. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  11. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  12. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  13. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  14. A new framework for construction project definition stage

    DEFF Research Database (Denmark)

    Pikas, Ergo; Oehmen, Josef; Koskela, Lauri

    2018-01-01

    One major reason for the poor performance of construction project delivery is related to the 'ill'- performed project definition stage. The emphasis on rational decision-making and methods have stifled the creativity important to problem structuring and solution generation. Problem is in the poor...

  15. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  16. IT Requirements Integration in High-Rise Construction Design Projects

    Science.gov (United States)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  17. Multiple Learning Strategies Project. Building Maintenance & Engineering. Visually Impaired.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is designed for visually impaired students in the vocational area of building maintenance and engineering. The twenty-eight learning modules are organized into six units: floor care, general maintenance tasks; restrooms; carpet care; power and hand tools; and cabinet construction. Each module, printed in large block…

  18. The American nuclear construction craftsmen: Will we be ready to build again?

    International Nuclear Information System (INIS)

    Bravo, R.

    1990-01-01

    The present state of nuclear plant maintenance and operations support reflects sexual, ethnic, and radical integration; continued educational advances; some computer literacy; mixed trades in maintenance; detailed training for maintenance and operations work in the operating plant; plant safety awareness and respect; need for top-quality, take the time to do it right mentality; and planning. With no new nuclear construction, what will be the specific talents, focus, and contributions that the craftsmen can be expected to bring to the project? To be prepared to successfully manage the next generation of nuclear plant construction, the industry must be acutely aware of the needs of the labor pool. To be aware of the needs requires an intimate knowledge of the present state of the craft talent, the changed expectations of their contributions, and the effects of new technologies, materials, methods, and individuals that will be used to design and build

  19. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  20. Quality monitoring in infrastructural design-build projects : the analysis of an audit-based monitoring system

    NARCIS (Netherlands)

    Favie, R.

    2010-01-01

    The roles of stakeholders in traditional construction projects were clear: the client was both responsible and liable for developing a detailed design and specifications and the construction companies had to build in accordance with these specifications. The use of integrated contracts e.g.

  1. Thinking Like a Whole Building: A Whole Foods Market New Construction Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Bonnema, E.; Doebber, I.; Hirsch, A.; McIntyre, M.; Scheib, J.

    2011-04-01

    Whole Foods Market participates in the U.S. Department of Energy's Commercial Building Partnerships (CBP) to identify and develop cost-effective, readily deployed, replicable energy efficiency measures (EEMs) for commercial buildings. Whole Foods Market is working with the National Renewable Energy Laboratory (NREL) on a retrofit and a new construction CBP project. Whole Foods Market's CBP new construction project is a standalone store in Raleigh, North Carolina. Whole Foods Market examined the energy systems and the interactions between those systems in the design for the new Raleigh store. Based on this collaboration and preliminary energy modeling, Whole Foods Market and NREL identified a number of cost-effective EEMs that can be readily deployed in other Whole Foods Market stores and in other U.S. supermarkets. If the actual savings in the Raleigh store - which NREL will monitor and verify - match the modeling results, each year this store will save nearly $100,000 in operating costs (Raleigh's rates are about $0.06/kWh for electricity and $0.83/therm for natural gas). The store will also use 41% less energy than a Standard 90.1-compliant store and avoid about 3.7 million pounds of carbon dioxide emissions.

  2. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  3. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  4. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  5. Project assessment for construction of new nuclear facility

    International Nuclear Information System (INIS)

    2013-01-01

    Project risk management is an important and integral part of project and quality management. It is also a key part of the due diligence process in making informed project decisions where in addition to the qualitative assessments quantitative ones shall be used to the extend practical. As part of the risk management process, risk identification, evaluation and mitigation must be an on-going activity at senior management levels throughout the planning, design, construction and commissioning phases of a new NPP

  6. High Performance Building Facade Solutions - PIER Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eleanor; Selkowitz, Stephen

    2009-12-31

    Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and

  7. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  8. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  9. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  10. Chapter 15: Commercial New Construction Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Energy Technology Data Exchange (ETDEWEB)

    Kurnik, Charles W. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Keates, Steven [ADM Associates, Inc., Atlanta, GA (United States)

    2017-10-09

    This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) or packages of measures where evaluators can analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol (IPMVP).

  11. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  12. Training program for energy conservation in new-building construction. Volume II. Energy conservation technology: for the building inspector

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    A Model Code for Energy Conservation in New Building Construction has been developed by those national organizations primarily concerned with the development and promulgation of model codes. The technical provisions are based on ASHRAE Standard 90-75 and are intended for use by state and local officials. This training manual contains the basic information necessary to acquaint the field building inspector with the concepts of energy conservation in buildings and instructs him in the basic techniques of field inspection of energy compliance.

  13. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  14. MUNI Ways and Structures Building Integrated Solar Membrane Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Randall

    2014-07-03

    renovated in 1998, but the existing roof had not been designed to carry a large load. Due to this fact, a complete roofing and structural analysis had to be performed to match the available roof loading to the existing and/or new solar PV technology, and BIPV was considered an excellent solution for this structure with the roof weight limitations. The solar BIPV system on the large roof area was estimated to provide about 25% of the total facility load with an average of 52,560 kWh per month. In order to accomplish the goals of the project, the following steps were performed: 1. SFPUC and consultants evaluated the structural capability of the facility roof, with recommendations for improvements necessary to accommodate the solar PV system and determine the suitable size of the system in kilowatts. The electrical room and switchgear were evaluated for any improvements necessary and to identify any constraints that might impede the installation of necessary inverters, transformers or meters. 2. Development of a design-build Request for Proposal (RFP) to identify the specifications for the solar PV system, and to include SFPUC technical specifications, equipment warranties and performance warranties. Due to potential labor issues in the local solar industry, SFPUC adjusted the terms of the RFP to more clearly define scope of work between electricians, roofers and laborers. 3. Design phase of project included electrical design drawings, calculations and other construction documents to support three submittals: 50% (preliminary design), 90% (detailed design) and 100% (Department of Building Inspection permit approved). 4. Installation of solar photovoltaic panels, completion of conduit and wiring work, connection of inverters, isolation switches, meters and Data Acquisition System by Contractor (Department of Public Works). 5. Commissioning of system, including all necessary tests to make the PV system fully functional and operational at its rated capacity of 100 kW (DC

  15. Study and constructive analysis of an office building

    OpenAIRE

    CORT AZCÁRRAGA, PAULA

    2015-01-01

    [EN] The development is based on the study and analysis of an office building located in Drongsesteenweg, Gent 9000. The building has 4 levels and basement. The structure is with prefabricated concrete, a very typical way to build in Belgium, only the basement was built in situ. Typology floor is hollow core slab, it is a prefabricated unidirectional floor. Stairs are prefabricated too, executed by a company specialized in this type works. To the facade they use two types of bricks, ceramic a...

  16. Causes of Low-Skilled Workers’ Performance in Construction Projects

    Directory of Open Access Journals (Sweden)

    Alhaji Ali Zannah

    2017-06-01

    Full Text Available Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achieved through a structured quantitative method of questionnaire distributed to 150 respondents that comprise of active stakeholders in the Nigerian construction industry. 111 responses representing 74 % were retrieved. The data were analysed using descriptive statistics and analysis of variance (ANOVA. The finding shows that; low wages of skilled, lack of sufficient skill acquisition centres and lack of incentive schemes for skilled workers were the most significant causes of low-skilled workers’ performance in the Nigerian construction industry. The homogenous analysis indicates that there are significant differences in perception of respondents on few variables whereas majority of respondents have similarities in most of the variables. The research findings indicate the need for stakeholders in the Nigerian construction industry to provide incentives and motivate skilled workers, provide training and retraining, conducive working condition, supply of quality materials and equipment, and proper site management in order improve low-skilled workers’ performance in Nigerian construction industry towards optimal performance.

  17. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    The published proceedings contain brief presentations concerning new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International scientific and technical conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of engineering Institutes of Islamic countries (FEIIC). (author)

  18. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    This issue contains papers, which reflect the most important achievements of new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International Scientific and Technical Conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of Engineering Institutes of Islamic Countries (FEIIC). (author)

  19. Internal structure of reactor building for Madras Atomic Power Project

    International Nuclear Information System (INIS)

    Pandit, D.P.

    1975-01-01

    The structural configuration and analysis of structural elements of the internal structure of reactor building for the Madras Atomic Power Project has been presented. Two methods of analysis of the internal structure, viz. Equivalent Plane Frame and Finite Element Method, are explained and compared with the use of bending moments obtained. (author)

  20. European indoor air quality audit project in 56 office buildings

    NARCIS (Netherlands)

    Bluyssen, P.M.; Oliveira Fernandes, E. de; Groes, L.; Clausen, G.H.; Fanger, F.O.; Valbjorn, O.; Bernhard, C.A.; Roulet, C.A.

    1996-01-01

    A European project started at the end of 1992, in which, in addition to current methods, trained sensory panels were used to investigate office buildings all over Europe. The main aim of this EC-Audit was to develop assessment procedures and guid-ance on ventilation and source control, to help

  1. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  2. 76 FR 13329 - Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building Services

    Science.gov (United States)

    2011-03-11

    ...] RIN 3090-AJ13 Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building.... SUMMARY: GSA is proposing to amend the General Services Administration Acquisition Regulation (GSAR) to amend the GSAR to restore guidance on making final payments under construction and building service...

  3. The effect of micro air movement on the heat and moisture characteristics of building constructions

    NARCIS (Netherlands)

    Schijndel, van A.W.M.

    2010-01-01

    The research focuses on the effect of air movement through building constructions. Although the typical air movement inside building constructions is quite small (velocity is of order ~10-5 m/s), this research shows the impact on the heat and moisture characteristics. The paper presents a case study

  4. The effect of micro air movement on the heat and moisture characteristics of building constructions

    NARCIS (Netherlands)

    Schijndel, van A.W.M.

    2008-01-01

    The research focuses on the effect of air movement through building constructions. Although the typical air movement inside building constructions is quite small (velocity is of order ~10-5 m/s), this research shows the impact on the heat and moisture characteristics. The paper presents a case study

  5. 13 CFR 120.131 - Leasing part of new construction or existing building to another business.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Leasing part of new construction or existing building to another business. 120.131 Section 120.131 Business Credit and Assistance... § 120.131 Leasing part of new construction or existing building to another business. (a) If the SBA...

  6. 29 CFR 779.336 - Sales of building materials for commercial property construction.

    Science.gov (United States)

    2010-07-01

    ... property construction. Sales of building materials to a contractor or speculative builder for the... 29 Labor 3 2010-07-01 2010-07-01 false Sales of building materials for commercial property construction. 779.336 Section 779.336 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION...

  7. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  8. Time to propagate green building construction concept for saving precious resources sustainable development

    International Nuclear Information System (INIS)

    Ali, Z.

    2005-01-01

    At present, we are constructing houses and buildings without giving any consideration to consumption of resources at the time of construction and consumption of resources for the use of such houses or buildings. ; Although green is our color but we are doing little about green building. Time has now come to propagate Green Building Construction Concepts in order to save our precious resources. The paper deals with dire need of awareness about conservation of water, conservation of energy, use of local materials, use of natural materials, etc. (author)

  9. Associations - Communities - Residents. Building together a citizen-based project of renewable energies - Methodological guide

    International Nuclear Information System (INIS)

    Ramard, Dominique; Fleury, Laurianne; Peyret, Albert; Ghesquiere, Christine; Kauber, Markus; Jourdain, Pierre

    2012-11-01

    This guide first outlines the challenges and stakes of citizen-based renewable energies: example of a necessary energy transition in Brittany, interest of a local production of renewable energies, examples in other European countries, and emergence of a citizen-based energy movement in France. The second part presents the four main phases of such a project (diagnosis, development, construction, and exploitation), the main issues to be addressed, and the main steps of a citizen-based renewable energy project (technical, legal and financial, and citizen-related aspects during the different phases). The third part describes how to elaborate a citizen-based project: by addressing the project dimensions, by defining a legal specification, by performing a provisional business model, by choosing an appropriate legal structure, by creating a project company, and by mobilizing local actors). The last part addresses how to finance the project: by building up own funds, by asking banks for support, and by citizen participation to investment

  10. Wood and Other Materials Used to Construct Nonresidential Buildings in the United States 2011 Executive Summary

    Science.gov (United States)

    David B. McKeever

    2013-01-01

    The construction of low-rise nonresidential buildings is an important market for lumber, engineered wood products, and structural and nonstructural wood panels in the United States. This report examines low-rise nonresidential buildings of six or fewer stories. Those with more than six stories are normally severely restricted by building codes from being wood framed....

  11. Wood and Other Materials Used to Construct Nonresidential Buildings in the United States 2011

    Science.gov (United States)

    Craig Adair; David B. McKeever; Chris Gaston; Margaret. Stewart

    2013-01-01

    The construction of low-rise nonresidential buildings is an important market for lumber, engineered wood products, and structural and nonstructural wood panels in the United States. This report examines low-rise nonresidential buildings of six or fewer stories. Those with more than six stories are normally severely restricted by building codes from being wood framed....

  12. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  13. Climate responsive and safe earthquake construction: a community building a school

    Directory of Open Access Journals (Sweden)

    Hari Darshan

    2011-10-01

    Full Text Available This article outlines environment friendly features, climate responsive features and construction features of a prototype school building constructed using green building technology. The school building has other additional features such as earthquake resistant construction, use of local materials and local technology. The construction process not only establishes community ownership, but also facilitates dissemination of the technology to the communities. Schools are effective media for raising awareness, disseminating technology and up-scaling the innovative approach. The approach is cost effective and sustainable for long-term application of green building technology. Furthermore, this paper emphasizes that such construction technology will be instrumental to build culture of safety in communities and reduce disaster risk.

  14. Modelling of energy consumption at construction of high-rise buildings

    Directory of Open Access Journals (Sweden)

    Korol Elena

    2018-01-01

    Full Text Available High-rise building structures in the course of its erection suppose primary use of methods provided for erection, concrete and external finishing works. Erection works do not differ significantly from usual ones: traditional equipment, accessories and techniques are used which are based on erection of structures in project position using a crane. Structures to be assembled in building frame include steel columns and beams, wall panels, form elements of columns, walls and floor structures. We can note heightened attention to operational control for quality of erection, but it is attributable to all works in the course of high-rise construction. During high-rise erection by means of cast in-situ reinforced concrete all formworks to be used do not have any special differences except systems specially designed for high-rise erection using sliding formwork or vertical traveling forms. In these systems special attention is paid to safety of elevated works. Working methods of placement and curing of concrete and structures as a whole remain traditional – the requirements for controlling such operations become toughened. The most evident differences in high-rise erection with regard to equipment, machinery and accessories used are in means provided for load transportation and safety of works at heights. Particularity of internal finishing works which are also obligatory during construction of skyscrapers allows not considering them in as technological differences from usual construction as far as the «height» of its execution is limited by height of particular floor and determined by price and building class.

  15. Modelling of energy consumption at construction of high-rise buildings

    Science.gov (United States)

    Korol, Elena; Korol, Oleg

    2018-03-01

    High-rise building structures in the course of its erection suppose primary use of methods provided for erection, concrete and external finishing works. Erection works do not differ significantly from usual ones: traditional equipment, accessories and techniques are used which are based on erection of structures in project position using a crane. Structures to be assembled in building frame include steel columns and beams, wall panels, form elements of columns, walls and floor structures. We can note heightened attention to operational control for quality of erection, but it is attributable to all works in the course of high-rise construction. During high-rise erection by means of cast in-situ reinforced concrete all formworks to be used do not have any special differences except systems specially designed for high-rise erection using sliding formwork or vertical traveling forms. In these systems special attention is paid to safety of elevated works. Working methods of placement and curing of concrete and structures as a whole remain traditional - the requirements for controlling such operations become toughened. The most evident differences in high-rise erection with regard to equipment, machinery and accessories used are in means provided for load transportation and safety of works at heights. Particularity of internal finishing works which are also obligatory during construction of skyscrapers allows not considering them in as technological differences from usual construction as far as the «height» of its execution is limited by height of particular floor and determined by price and building class.

  16. Application of Updated Construction and Demolition Waste Reduction Policy to Army Projects

    Science.gov (United States)

    2015-12-01

    recovering materials for reuse and recycling from demolition, new construction, and renovation and repurposing projects. In its efforts to improve the...Building contents; reuse and recycling potential (including the follow- ing specific materials, products and components that are potentially re- usable...conventional demolition. Implement deconstruction wherever markets or on-site reuse opportunities exist or are anticipated.  Page 24, 3-7 REDUCE

  17. Technology Solutions Case Study: Design Guidance for Passive Vents in New Construction, Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-02-12

    In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.

  18. ESCO Project for Buildings of Government Agencies in Thailand

    Directory of Open Access Journals (Sweden)

    Prukvilailert Monchai

    2016-01-01

    Full Text Available In Thailand, Department of Alternative Energy Development and Efficiency (DEDE have organized the ESCO project to promote and encourage the use of machinery, materials and equipment having high efficiency for government buildings. ESCO company provides the invest and management for changing equipments in the buildings. In this paper, the evaluation of the project has been presented. The potential of electricity savings is about 77 million kwhr/year. It can reduce imports of crude oil about 6.58 thousand tons of crude oil (Ktoe/year. The budget to invest is BHT 1,504 million, with an average payback period of 4.85. However, we found that the establishment of the budget is the barriers. The recommendations and solutions using legal process have been presented to proceed the project in the future.

  19. Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-07-01

    Full Text Available Considering the cooperative relationship between owners and contractors in sustainable construction projects, as well as the synergistic effects created by cooperative behaviors, a cooperative incentive model was developed using game theory. The model was formulated and analyzed under both non-moral hazard and moral hazard situations. Then, a numerical simulation and example were proposed to verify the conclusions derived from the model. The results showed that the synergistic effect increases the input intensity of one party’s resource transfer into the increase of marginal utility of the other party, thus the owner and contractor are willing to enhance their levels of effort. One party’s optimal benefit allocation coefficient is positively affected by its own output efficiency, and negatively affected by the other party’s output efficiency. The effort level and expected benefits of the owner and contractor can be improved by enhancing the cooperative relationship between the two parties, as well as enhancing the net benefits of a sustainable construction project. The synergistic effect cannot lower the negative effect of moral hazard behaviors during the implementation of sustainable construction projects. Conversely, the higher levels of the cooperative relationship, the wider the gaps amongst the optimal values under both non-moral hazard and moral hazard situations for the levels of effort, expected benefits and net project benefits. Since few studies to date have emphasized the effects of cooperative relationship on sustainable construction projects, this study constructed a game-based incentive model to bridge the gaps. This study contributes significant theoretical and practical insights into the management of cooperation amongst stakeholders, and into the enhancement of the overall benefits of sustainable construction projects.

  20. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  1. Construction engineering and planning of buildings related to the EPR

    International Nuclear Information System (INIS)

    Kaercher, H.

    1995-01-01

    Among the site-independent unit buildings are the reactor building with annulus; building for safety systems with main control room; new fuel storage pit, emergency power unit, reactor auxiliaries, access building; conventional switchgear building, and the turbine building. All buildings housing safety-related systems are protected against external and internal influences. Among the design-determining external influences are earthquakes, explosion high-pressure wave and aircraft crash. Internal incidents are caused by failure of components and pipes. The most discussed incident in the connection is the failure of the reactor pressure vessel involving core melt release which is safely retained by special devices. Earlier 3D plant models made of plastic have been replaced by 3D CAE computer models. Thus the graphic data of CAD systems have been added to the immense amount of logistic programmes/process data chains. This leads to new planning tools which are able to safely process such amounts of data and at the same time notably reduce planning time and expense. The whole data processing concept is characterized by simple, consistent data structures according to a uniform data model. It enables continual treatment throughout all planning stages and data exchange through simple, uniformly structured interfaces. (orig./HP) [de

  2. Infrared survey of 50 buildings constructed during 100 years: thermal performances and damage conditions

    Science.gov (United States)

    Ljungberg, Sven-Ake

    1995-03-01

    Different building constructions and craftsmanship give rise to different thermal performance and damage conditions. The building stock of most industrial countries consists of buildings of various age, and constructions, from old historic buildings with heavy stone or wooden construction, to new buildings with heavy or light concrete construction, or modern steel or wooden construction. In this paper the result from a detailed infrared survey of 50 buildings from six Swedish military camps is presented. The presentation is limited to a comparison of thermal performance and damage conditions of buildings of various ages, functions, and constructions, of a building period of more than 100 years. The result is expected to be relevant even to civilian buildings. Infrared surveys were performed during 1992-1993, with airborne, and mobile short- and longwave infrared systems, out- and indoor thermography. Interpretation and analysis of infrared data was performed with interactive image and analyzing systems. Field inspections were carried out with fiber optics system, and by ocular inspections. Air-exchange rate was measured in order to quantify air leakages through the building envelope, indicated in thermograms. The objects studied were single-family houses, barracks, office-, service-, school- and exercise buildings, military hotels and restaurants, aircraft hangars, and ship factory buildings. The main conclusions from this study are that most buildings from 1880 - 1940 have a solid construction with a high quality of craftsmanship, relatively good thermal performance, due to extremely thick walls, and adding insulation at the attic floor. From about 1940 - 1960 the quality of construction, thermal performance and craftsmanship seem to vary a lot. Buildings constructed during the period of 1960 - 1990 have in general the best thermal performance due to a better insulation capacity, however, also one finds here the greatest variety of problems. The result from this

  3. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  4. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  5. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  6. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  7. Management of construction and demolition wastes as secondary building resources

    Science.gov (United States)

    Manukhina, Lyubov; Ivanova, Irina

    2017-10-01

    The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.

  8. 324 Building liquid waste handling and removal system project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  9. An Agent Based Approach for Project Management in Construction

    OpenAIRE

    Sencer, Safiye; Turgay, Tahsin

    2013-01-01

    Project management has an important role in terms of time, cost and flexibility. An agentbased architecture provides additional robustness, scalability, flexibility that is particularly appropriate for problems with a dynamic and distributed nature. Integrated agent based project management covers design and construction planning. It is combined with plan execution, tolerating both the design and plan, which may be changed as necessary. In this reason, the decision making process requires tha...

  10. Advanced FRP for flooring in buildings: a low carbon material application in the construction industry

    OpenAIRE

    Gao, Yijian

    2013-01-01

    Fibre-reinforced polymers (FRP) are building materials that permit both the improvement of long-term building performance and the simplification of the construction process, thanks to their high specific strength, low thermal conductivity, good environmental resistance, and ability to be formed into complex shapes. FRP materials are well-suited to fulfilling many building functions. By integrating traditionally separate building systems and layers into single function-integrated components, a...

  11. Determination of sustainable values for the parameters of the construction of residential buildings

    Science.gov (United States)

    Grigoreva, Larisa; Grigoryev, Vladimir

    2018-03-01

    For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  12. Determination of sustainable values for the parameters of the construction of residential buildings

    Directory of Open Access Journals (Sweden)

    Grigoreva Larisa

    2018-01-01

    Full Text Available For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  13. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  14. Structuring Requirements in a Multi-Project Environment in the Construction Industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    2012-01-01

    Being in control of requirements in building projects is vital, since it helps securing the often small profit margins and the reputation of the responsible company. Hence this research aims to introduce requirements management to the construction industry. By means of case study and action...... in this industry, yet, success is here defined as an accomplished and accepted implementation of requirements management processes that are used by the relevant project members in their daily work and where the benefits of implementing requirements management outweighs the cost of invested resources. Furthermore...... it is argued that when running technology development, product development, product platform development, and a portfolio of building projects at the same time the use of requirements management is advantageous and an intelligent way of structuring requirements is needed. This article also demonstrates...

  15. Nearly Zero Energy Buildings: An Overview of the Main Construction Features across Europe

    Directory of Open Access Journals (Sweden)

    Giulia Paoletti

    2017-05-01

    Full Text Available Nearly Zero Energy Buildings (nZEBs represent the backbone to achieve ambitious European goals in terms of energy efficiency and CO2 emissions reduction. As defined in the EPBD, by 31 December 2020, all of the new buildings will have to reach a target of nearly zero energy. This target encourages the adoption of innovative business models as well as the technology development in the building sector, aimed at reducing energy demand and exploiting local renewable energy sources (RES. Assessing the share of implementation and the performance of technologies in new or renovated nZEBs is strategic to identify the market trends and to define design guidelines with the most effective solutions according to the context. In this regard, this paper analyses the construction features of a set of nZEBs, collected in 17 European countries within the EU IEE ZEBRA2020 project, with a special focus on the influence of the boundary conditions on the technologies adopted. The results show a general high insulation level of the envelope and recurrent specific technologies in the Heating Ventilation Air Conditioning (HVAC system (i.e., heat pumps and mechanical ventilation, while the climatic conditions do not drive significantly the design approach and the nZEB features.

  16. The S-curve for forecasting waste generation in construction projects.

    Science.gov (United States)

    Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling

    2016-10-01

    Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Risk Factors of Building Apartments for University Talent through the Agent Construction Mode in China: Interrelationship and Prioritization

    Directory of Open Access Journals (Sweden)

    Zhengrong Liu

    2016-03-01

    Full Text Available Apartments for university talent (AUT, are apartments provided to staff at non-market price, in order to attract outstanding scholars from around the world to work in universities and improve educational quality. This has been a critical issue in achieving social sustainability in China during rapid urbanization and industrialization. The agent construction mode has been adopted to build AUT because universities usually lack relevant management experience. The agent construction mode is a type of turnkey engineer construction based on the principal-agent model, project bidding mode, engineering contracting projects, and project supervision system. Risk factors are important considerations for both universities and agent construction companies. Although some studies have investigated the risk factors, only a few studies have identified the hierarchical structure of relevant risk factors. Therefore, the interrelationship and prioritization of the risk factors remain unknown, and this situation presents a barrier to better risk management. This paper investigates the interrelationship of risk factors with interpretative structural modeling (ISM. In addition, fuzzy MICMAC (matric d’impacts croises-multiplication appliqué a un classemen analysis was conducted to prioritize the risk factors. The findings provide useful references for better risk management of building AUT through the agent construction mode. Although this study focuses on China, the analytical process can also be generalized to other research topics and other countries.

  18. Mechanisms and sources of radon entry in buildings constructed with modern technologies

    International Nuclear Information System (INIS)

    Zhukovsky, M.V.; Vasilyev, A.V.

    2014-01-01

    To investigate the influence of modern building construction technologies on the accumulation of radon indoor, 20 rooms in buildings constructed using mostly monolithic concrete or aerated concrete blocks have been studied. Dominance of the diffusion mechanism of radon entry in buildings constructed with modern technologies has been established. As a result of computer simulations it was found that the main contribution to the variability of radon concentration was made by changes in the ventilation rate. At a low ventilation rate ( -1 ) radon concentration above 200 Bq m -3 can be observed for residential buildings. There is a need for the regulation of the radium-specific activity in building materials. According to the estimates of this study, the content of 226 Ra in building materials should not exceed the value of 100 Bq kg -1 . (authors)

  19. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  20. causes of conflicts in construction projects in nigeria

    African Journals Online (AJOL)

    user

    NIGERIA. 2 DEPARTMENT OF ARCHITECTURE AND CIVIL ENGINEERING, CITY ... Thus, this study was aimed at identifying and assessing causes of conflicts in Nigeria .... technical specification, government intervention, ..... scale construction projects: A case study,” Constr. ... study of Bygga Villa, a Swedish triple helix e-.

  1. The use of interorganisational ICT in United States construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    In recent research, the use of ICT applications in real time construction projects have been documented and analysed extensively. However, there is a need for identifying and analysing in-depth the mechanisms influencing the use of interorganisational ICT applications and for solutions to eliminate

  2. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    Directory of Open Access Journals (Sweden)

    Özlem Tüz

    2013-12-01

    Full Text Available Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of the money. In this study, monitoring and measuring of the leverage ratio because of the displacement in cash inflows of construction projects which uses high leverage and low cash to do business in the sector is targeted. Cash need because of drifting the cash inflows may be seen due to the model. Work should be done in the early stages of the project with little capital but in the later stages, rapidly growing capital need arises.The values obtained from the model may be used to supply the capital held in the right time by anticipating the risks because of the delay in cashflow of construction projects which uses high leverage ratio.

  3. Information richness in construction projects: A critical social theory

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Greenwood, David

    2002-01-01

    Two important factors influencing the communication in construction projects are the interests of the people involved and the language spoken by the people involved. The objective of the paper is to analyse these factors by using recent insights in the information richness theory. The critical

  4. Performance-based procurement for low disturbance brdige construction projects

    NARCIS (Netherlands)

    Sebastian, R.; Claeson-Jonsson, C.; Di Giulio, R.

    2013-01-01

    Purpose – This paper aims to introduce a method of performance-based procurement, based on the most economically advantageous tender (MEAT), for low-disturbance bridge construction projects in urban environment. Design/methodology/approach – The first part of this paper reviews the key performance

  5. Development as an effective management system construction and investment projects

    Directory of Open Access Journals (Sweden)

    Beloborodov Roman S.

    2011-02-01

    Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.

  6. A two-factor method for appraising building renovation and energy efficiency improvement projects

    International Nuclear Information System (INIS)

    Martinaitis, Vytautas; Kazakevicius, Eduardas; Vitkauskas, Aloyzas

    2007-01-01

    The renovation of residential buildings usually involves a variety of measures aiming at reducing energy and building maintenance bills, increasing safety and market value, and improving comfort and aesthetics. A significant number of project appraisal methods in current use-such as calculations of payback time, net present value, internal rate of return or cost of conserved energy (CCE)-only quantify energy efficiency gains. These approaches are relatively easy to use, but offer a distorted view of complex modernization projects. On the other hand, various methods using multiple criteria take a much wider perspective but are usually time-consuming, based on sometimes uncertain assumptions and require sophisticated tools. A 'two-factor' appraisal method offers a compromise between these two approaches. The main idea of the method is to separate investments into those related to energy efficiency improvements, and those related to building renovation. Costs and benefits of complex measures, which both influence energy consumption and improve building constructions, are separated by using a building rehabilitation coefficient. The CCE is used for the appraisal of energy efficiency investments, while investments in building renovation are appraised using standard tools for the assessment of investments in maintenance, repair and rehabilitation

  7. Nuclear civil construction, an essential activity dedicated to outstanding projects

    International Nuclear Information System (INIS)

    Herve, G.

    2016-01-01

    The complexity of nuclear civil construction is directly linked to the safety requirements imposed on nuclear facilities: durability in terms of time, stability, containment, tightness, managing cracking and leakages, quality controls... These requirements imply specific measures for instance the concrete that is used for the containment building has a particular composition that gives it an enhanced resistance or the substantial thickness of the foundation raft implies monitoring the temperature at which the concrete is poured. The construction of the EPR at the Flamanville site is taken as an example. This construction involves 120.000 tonnes of concrete-reinforcement steels, 400.000 m"3 of concrete, 400 km of pipes and 1600 km of cables. (A.C.)

  8. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  9. Energy use for building construction. Final report, March 1, 1976--December 31, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Hannon, B M; Stein, R G; Segal, B; Serber, D; Stein, C

    1976-12-01

    Total (direct and indirect) energy requirements of the construction industry for 1967 were determined in order to examine the potential for energy savings. The Energy Input/Output Model developed at the Center for Advanced Computation, University of Illinois, was expanded to include 49 building and non-building construction sectors (new and maintenance). Total energy intensities were determined for these sectors, as well as energy requirements to final demand. Overall, the construction industry required about 6000 trillion Btu, or about 9% of the total U. S. energy requirement in 1967. About 20% of this requirement was for direct energy. Energy requirements were further broken down according to goods and services purchased by individual construction sectors, and energy distribution patterns were determined within each construction sector. Energy cost per unit for various building materials were calculated, as well as 1967 energy cost per square foot for building sectors. Laboratories required the most energy per square foot (2,074,056 Btu/SF), while Farm Service required the least (149,071 Btu/SF). Comparative interchangeable building assemblies were evaluated for their energy costs, including initial construction and lifetime maintenance energy. Tradeoffs between construction and operational energy costs were determined for a selected wall frame assembly with different exterior finishes and varying degrees of insulation. A study was initiated to determine industries in which direct energy use led to a significant amount of the energy embodied in New Building Construction for 1967. The resulting Energy Flow Chart is included.

  10. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction

    International Nuclear Information System (INIS)

    Diaz Prada, J. I.; Cubian, B.

    2014-01-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  11. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  12. Supply chain for new construction: buy where we build

    International Nuclear Information System (INIS)

    Cruz, J. L.; Bueno, S.

    2012-01-01

    A global supply strategy has been placed by Westinghouse in order to face the current and future constructions. And in this way, Westinghouse will be able to take advantage of benefit of Local Supply. this article shows the Westinghouse Global Supply Strategy, Local Supply considerations, the current state of supplier calcifications, and finally Memorandums of Understanding and Alliances agreed with local suppliers around the world to provide a suitable solution for the new construction needs. (Author)

  13. Information support of monitoring of technical condition of buildings in construction risk area

    Science.gov (United States)

    Skachkova, M. E.; Lepihina, O. Y.; Ignatova, V. V.

    2018-05-01

    The paper presents the results of the research devoted to the development of a model of information support of monitoring buildings technical condition; these buildings are located in the construction risk area. As a result of the visual and instrumental survey, as well as the analysis of existing approaches and techniques, attributive and cartographic databases have been created. These databases allow monitoring defects and damages of buildings located in a 30-meter risk area from the object under construction. The classification of structures and defects of these buildings under survey is presented. The functional capabilities of the developed model and the field of it practical applications are determined.

  14. Study on the Quality Management of Building Electricity Engineering Construction in the Whole Process

    Science.gov (United States)

    Qin, Minwu

    2018-05-01

    With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.

  15. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  16. Aligning building information model tools and construction management methods

    NARCIS (Netherlands)

    Hartmann, Timo; van Meerveld, H.J.; Vossebeld, N.; Adriaanse, Adriaan Maria

    2012-01-01

    Few empirical studies exist that can explain how different Building Information Model (BIM) based tool implementation strategies work in practical contexts. To help overcoming this gap, this paper describes the implementation of two BIM based tools, the first, to support the activities at an

  17. Air Tight: Building Inflatables/Inflatable Construction: Planning and Details

    Science.gov (United States)

    Kennedy, Kriss J.

    2016-01-01

    A design-build seminar consisting of students from Physics, Mechanical and Civil Engineering, Robotic, Material Science, Art, and Architecture who will work together on a deployable "closed-loop" inflatable greenhouse for Mars in theory, and an Earth analogue physical mockup on campus.

  18. ICT in building construction: prospects and challenges in developing ...

    African Journals Online (AJOL)

    For century, humans have created structures but the American wonder which is technology, made what seems impossible possible. The traditional adobe buildings with thatched roof and mud block have been developed to the modern skyscraper. Today, a house can be built with insulation and can be inflated or deflated to ...

  19. CONSTRUCTION PROJECTS VERSUS THE PROTECTION OF NATURE AND ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Elżbieta Hanna Szafranko

    2017-02-01

    Full Text Available Construction investments are related to the economic development of each country. Expansion of towns and settlements, construction, industrial, commercial and recreational objects and the communication network is necessary and results from regional development strategies. For their implementation it is necessary to prepare the area designated for their development. In many regions of our country area suitable for construction are increasingly limited, and furthermore investors often looks for an attractive investment location. For this reason, more and more construction projects dangerously close to areas of high natural value and protected and often are entering the these areas. To minimize the negative investment impact on the environment there are developed several variants of investment. Next, assessing the positive and negative effects, we choose the best, from the point of view of the surrounding environment solution. To illustrate the procedure example of analysis using the method proposed by the author, the indicator is shown.

  20. Dynamic Analysis of an Office Building due to Vibration from Road Construction Activities

    Science.gov (United States)

    Chik, T. N. T.; Kamil, M. R. H.; Yusoff, N. A.; Ibrahim, M. H. W.

    2018-04-01

    Construction activities are widely known as one of the predominant sources of man-made vibrations that able to create nuisance towards any adjacent building, and this includes the road construction operations. Few studies conclude the construction-induced vibration may be harmful directly and indirectly towards the neighbouring building. This lead to the awareness of study the building vibration response of concrete masonry load bearing system and its vibrational performance towards the road construction activities. This study will simulate multi-storey office building of Sekolah Menengah Kebangsaan (SMK) Bandar Enstek at Negeri Sembilan by using finite element vibration analyses. The excitation of transient loads from ground borne vibrations which triggered by the road construction activities are modelled into the building. The vibration response was recorded during in-situ ambient vibration test by using Laser Doppler Vibrometer (LDV), which specifically performed on four different locations. The finite element simulation process was developed in the commercial FEA software ABAQUS. Then, the experimental data was processed and evaluated in MATLAB ModalV to assess the vibration criteria of the floor in building. As a result, the vibration level of floor in building is fall under VC-E curve which was under the maximum permissible level for office building (VC-ISO). The vibration level on floor is acceptable within the limit that have been referred.

  1. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  2. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  3. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  4. Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements

    International Nuclear Information System (INIS)

    KLEM, M.J.

    2000-01-01

    In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the

  5. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  6. Towards a sustainable aesthetics. Architects constructing energy efficient buildings

    Energy Technology Data Exchange (ETDEWEB)

    Ryghaug, Marianne

    2002-07-01

    This interdisciplinary study discusses challenges in energy economising in Norway as they involve the architect profession and their role in affecting the energy standard in buildings. The main research question is separated into two component research questions. The first is to analyse how the reality orientation of the architect profession is constituted and maintained, and how this in turn influences their values in connection to energy related decisions. How is the architects' professional role conception reflected in the educational system and architect journals, and how is it expressed among the 'green outsiders' of the profession? The second component research question is related to decision-making processes regarding design processes, particularly concerning energy in buildings and the role played by the architects in these processes as they interact with other actors and within institutional frames.

  7. Towards a sustainable aesthetics. Architects constructing energy efficient buildings

    Energy Technology Data Exchange (ETDEWEB)

    Ryghaug, Marianne

    2002-07-01

    This interdisciplinary study discusses challenges in energy economising in Norway as they involve the architect profession and their role in affecting the energy standard in buildings. The main research question is separated into two component research questions. The first is to analyse how the reality orientation of the architect profession is constituted and maintained, and how this in turn influences their values in connection to energy related decisions. How is the architects' professional role conception reflected in the educational system and architect journals, and how is it expressed among the 'green outsiders' of the profession? The second component research question is related to decision-making processes regarding design processes, particularly concerning energy in buildings and the role played by the architects in these processes as they interact with other actors and within institutional frames.

  8. Considerations on safety against seismic excitations in the project of reactor auxiliary building and control building in nuclear power plants

    International Nuclear Information System (INIS)

    Santos, S.H.C.; Castro Monteiro, I. de

    1986-01-01

    The seismic requests to be considered in the project of main buildings of a nuclear power plant are discussed. The models for global seismic analysis of nuclear power plant structures, as well as models for global strength distribution are presented. The models for analysing reactor auxiliary building and control building, which together with the reactor building and turbine building form the main energy generation complex in a nuclear power plant, are described. (M.C.K.) [pt

  9. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  10. Thermal insulating system particularly adapted for building construction

    International Nuclear Information System (INIS)

    Dyar, H.G.

    1985-01-01

    This disclosure relates to an insulating system which is particularly adapted for insulating the walls, floors, ceilings and like structure of buildings and includes a panel having a hollow chamber or interior under negative pressure (vacuum) and being of a variety of external peripheral sizes and shapes to fit within areas defined by wall and/or floor and/or ceiling studs, beams, or the like, a plurality of springs, chains or the like for supporting the panel in generally spaced relationship to an associated building wall, ceiling, floor or like structure, and a plurality of pin-like elements of relatively small cross-sectional configuration normally spaced from the exterior surface of the panel for contacting a limited exterior surface area of the panel only upon the springs, chains or the like becoming inoperative which would in the absence of the pin-like elements result in direct contact between the panel and the associated building wall, ceiling, floor or like structure and thus reduce the insulating efficiency thereof

  11. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  12. Canister Storage Building (CSB) safety analysis report, phase 3: Safety analysis documentation supporting CSB construction

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1997-01-01

    The US Department of Energy established the K Basins Spent Nuclear Fuel Project to address safety and environmental concerns associated with deteriorating spent nuclear fuel presently stored under water in the Hanford Site's K Basins, which are located near the Columbia River. Recommendations for a series of aggressive projects to construct and operate systems and facilities to manage the safe removal of K Basins fuel were made in WHC-EP-0830, Hanford Spent Nuclear Fuel Recommended Path Forward, and its subsequent update, WHC-SD-SNF-SP-005, Hanford Spent Nuclear Fuel Project Integrated Process Strategy for K Basins Fuel. The integrated process strategy recommendations include the following steps: Fuel preparation activities at the K Basins, including removing the fuel elements from their K Basin canisters, separating fuel particulate from fuel elements and fuel fragments greater than 0.6 cm (0.25 in.) in any dimension, removing excess sludge from the fuel and fuel fragments by means of flushing, as necessary, and packaging the fuel into multicanister overpacks (MCOs); Removal of free water by draining and vacuum drying at a cold vacuum drying facility ES-122; Dry shipment of fuel from the Cold Vacuum Drying to the Canister Storage Building (CSB), a new facility in the 200 East Area of the Hanford Site

  13. An Assessment Of Compliance Of Building Construction Projects ...

    African Journals Online (AJOL)

    indirect impacts on the environment by displacement of communities and ... These pose threats to the existence of man and the sustenance of natural vegetation. Environmental Impact Assessment (EIA) is encapsulated as a practicable ...

  14. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    OpenAIRE

    Özlem Tüz; Şafak Ebesek

    2013-01-01

    Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of th...

  15. Control panel and indicators for production control in building projects

    Directory of Open Access Journals (Sweden)

    Orihuela Pablo

    2018-02-01

    Full Text Available In general, every project should have indicators that monitor compliance with established goals. In con­struction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper sub­mitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230, presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.

  16. Lessons for South Africa from global trends in environmental labelling of buildings and construction products

    CSIR Research Space (South Africa)

    Ampofo-Anti, NL

    2012-02-01

    Full Text Available This chapter examines the international state-of-the-art of environmental labelling of buildings and construction products; and discusses ways in which the emerging South African framework for environmental labelling could benefit from the lessons...

  17. Canister storage building (CSB) safety analysis report phase 3:safety analysis documentation supporting CSB construction

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-01-01

    The purpose of this report is to provide an evaluation of the Canister Storage Building (CSB) design criteria, the design's compliance with the applicable criteria, and the basis for authorization to proceed with construction of the CSB

  18. Simulation-based modeling of building complexes construction management

    Science.gov (United States)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  19. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  20. Characteristics of worker accidents on NYSDOT construction projects.

    Science.gov (United States)

    Mohan, Satish; Zech, Wesley C

    2005-01-01

    This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.