WorldWideScience

Sample records for bridges electric

  1. Electrical Actuation Technology Bridging

    Science.gov (United States)

    Hammond, Monica (Compiler); Sharkey, John (Compiler)

    1993-01-01

    This document contains the proceedings of the NASA Electrical Actuation Technology Bridging (ELA-TB) Workshop held in Huntsville, Alabama, September 29-October 1, 1992. The workshop was sponsored by the NASA Office of Space Systems Development and Marshall Space Flight Center (MSFC). The workshop addressed key technologies bridging the entire field of electrical actuation including systems methodology, control electronics, power source systems, reliability, maintainability, and vehicle health management with special emphasis on thrust vector control (TVC) applications on NASA launch vehicles. Speakers were drawn primarily from industry with participation from universities and government. In addition, prototype hardware demonstrations were held at the MSFC Propulsion Laboratory each afternoon. Splinter sessions held on the final day afforded the opportunity to discuss key issues and to provide overall recommendations. Presentations are included in this document.

  2. Polymeric salt bridges for conducting electric current in microfluidic devices

    Science.gov (United States)

    Shepodd, Timothy J [Livermore, CA; Tichenor, Mark S [San Diego, CA; Artau, Alexander [Humacao, PR

    2009-11-17

    A "cast-in-place" monolithic microporous polymer salt bridge for conducting electrical current in microfluidic devices, and methods for manufacture thereof is disclosed. Polymeric salt bridges are formed in place in capillaries or microchannels. Formulations are prepared with monomer, suitable cross-linkers, solvent, and a thermal or radiation responsive initiator. The formulation is placed in a desired location and then suitable radiation such as UV light is used to polymerize the salt bridge within a desired structural location. Embodiments are provided wherein the polymeric salt bridges have sufficient porosity to allow ionic migration without bulk flow of solvents therethrough. The salt bridges form barriers that seal against fluid pressures in excess of 5000 pounds per square inch. The salt bridges can be formulated for carriage of suitable amperage at a desired voltage, and thus microfluidic devices using such salt bridges can be specifically constructed to meet selected analytical requirements.

  3. Floating liquid bridge tensile behavior: Electric-field-induced Young's modulus measurements

    Science.gov (United States)

    Teschke, Omar; Mendez Soares, David; Valente Filho, Juracyr Ferraz

    2013-12-01

    A floating bridge is formed spontaneously when high voltage is applied to polar fluids in two capillary tubes that were in contact and then separated. This bridge bends under its own weight, and its bending profile was used to calculate its Young's modulus. For electric field intensities of ˜106 V/m, water bridges exhibit viscoelastic behavior, with Young's moduli of ˜24 MPa; dimethylsulfoxide (DMSO) bridges exhibited Young's moduli of ˜60 kPa. The scheme devised to measure the voltage drop across the water bridge for high voltages applied between the electrodes shows that the bulk water resistance decreases with increasing voltage.

  4. Imaging voids beneath bridge bent using electrical resistivity tomography.

    Science.gov (United States)

    2014-02-01

    Five electrical resistivity tomography (ERT) profiles and borehole control were acquired beneath two bridges on the bank of the : Gasconade River in order to determine extension of the underground water-filled openings in rock encountered during a dr...

  5. Structure of the floating water bridge and water in an electric field.

    Science.gov (United States)

    Skinner, Lawrie B; Benmore, Chris J; Shyam, Badri; Weber, J K R; Parise, John B

    2012-10-09

    The floating water bridge phenomenon is a freestanding rope-shaped connection of pure liquid water, formed under the influence of a high potential difference (approximately 15 kV). Several recent spectroscopic, optical, and neutron scattering studies have suggested that the origin of the bridge is associated with the formation of anisotropic chains of water molecules in the liquid. In this work, high energy X-ray diffraction experiments have been performed on a series of floating water bridges as a function of applied voltage, bridge length, and position within the bridge. The two-dimensional X-ray scattering data showed no direction-dependence, indicating that the bulk water molecules do not exhibit any significant preferred orientation along the electric field. The only structural changes observed were those due to heating, and these effects were found to be the same as for bulk water. These X-ray scattering measurements are supported by molecular dynamics (MD) simulations which were performed under electric fields of 10(6) V/m and 10(9) V/m. Directional structure factor calculations were made from these simulations parallel and perpendicular to the E-field. The 10(6) V/m model showed no significant directional-dependence (anisotropy) in the structure factors. The 10(9) V/m model however, contained molecules aligned by the E-field, and had significant structural anisotropy.

  6. Size effects in electrical behavior of high-Tc thin-film bridges

    International Nuclear Information System (INIS)

    Afanasyev, A.S.; Gubankov, V.N.; Divin, Y.Y.

    1991-01-01

    This paper reports on the size effects in electrical characteristics of polycrystalline YBa 2 Cu 3 O 7-x thin-film bridges studied in the temperature range 4-300K. It is shown, that at T > T c the decrease of bridge widths w from 200 to 10 μm leads to the increase of resistance R in several times and to the change in R □ (T) behavior □ from metallic type to activation type. At □ T approx-lt T c the R □ (w) values exponentially increased when the width w was decreased under some definite size L. At T c the index I c (T) ∼ (T - T) α changed from 3 to 1 if bridge width was decreased. Experimental data are discussed within the model, which takes into account large-scale percolation processes in the system of different intergrain Josephson junctions, where characteristic length L 0 of critical subnetwork is much larger than the grain size

  7. Do We Need Gas as a Bridging Fuel? A Case Study of the Electricity System of Switzerland

    Directory of Open Access Journals (Sweden)

    Paula Díaz

    2017-06-01

    Full Text Available Many future electricity scenarios, including those from the International Energy Agency, use natural gas to bridge the transition to renewables, in particular as a means of balancing intermittent generation from new renewables. Given that such strategies may be inconsistent with strategies to limit climate change to below 2 °C, we address the question of whether such use of gas is necessary or cost effective. We conduct a techno-economic case study of Switzerland, using a cost optimization model. We explore a range of electricity costs, comparing scenarios in which gas is used as a source of base-load power, a source of balancing capacity, and not used at all. Costs at the high end of the range show that a complete decarbonization increases system-wide costs by 3% compared to a gas bridging scenario, and 13–46% compared to a carbon-intensive scenario, depending on the relative shares of solar and wind. Costs at the low end of the range show that system-wide costs are equal or lower for both completely decarbonized and gas bridging scenarios. In conclusion, gas delivers little to no cost savings as a bridging fuel in a system that switches to wind and solar.

  8. The Relation between the Electric Conductance of Nanostructure Bridge and Friedel Sum Rule

    International Nuclear Information System (INIS)

    Kotani, Y; Shima, N; Makoshi, K

    2012-01-01

    We analyze the electric conductance through nanostructure bridges in terms of phase-shifts, which satisfy the Friedel sum rule. The phase-shifts are given by solving the eigenvalue equation obtained by extending the method applied to a single impurity problem in a metal. The local charge neutrality condition is introduced through the Friedel sum rule. It is analytically shown that the electric conductance can increase as the two electrodes separate with the condition in which the phase-shifts satisfy the Friedel sum rule. The increment of the distance between two electrodes is obtained by gradually separating interatomic distance.

  9. 49 CFR 236.766 - Locking, movable bridge.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  10. Significant manipulation of output performance of a bridge-structured spin valve magnetoresistance sensor via an electric field

    Science.gov (United States)

    Zhang, Yue; Yan, Baiqian; Ou-Yang, Jun; Wang, Xianghao; Zhu, Benpeng; Chen, Shi; Yang, Xiaofei

    2016-01-01

    Through principles of spin-valve giant magnetoresistance (SV-GMR) effect and its application in magnetic sensors, we have investigated electric-field control of the output performance of a bridge-structured Co/Cu/NiFe/IrMn SV-GMR sensor on a PZN-PT piezoelectric substrate using the micro-magnetic simulation. We centered on the influence of the variation of uniaxial magnetic anisotropy constant (K) of Co on the output of the bridge, and K was manipulated via the stress of Co, which is generated from the strain of a piezoelectric substrate under an electric field. The results indicate that when K varies between 2 × 104 J/m3 and 10 × 104 J/m3, the output performance can be significantly manipulated: The linear range alters from between -330 Oe and 330 Oe to between -650 Oe and 650 Oe, and the sensitivity is tuned by almost 7 times, making it possible to measure magnetic fields with very different ranges. According to the converse piezoelectric effect, we have found that this variation of K can be realized by applying an electric field with the magnitude of about 2-20 kV/cm on a PZN-PT piezoelectric substrate, which is realistic in application. This result means that electric-control of SV-GMR effect has potential application in developing SV-GMR sensors with improved performance.

  11. OnWien Bridge Oscillators as Modified Multi-vibrators

    DEFF Research Database (Denmark)

    Lindberg, Erik

    2014-01-01

    A tutorial introduction to electrical oscilla- tors. Investigating Wien bridge oscillators as modified multi-vibrators. Introducing chaotic behavior into a Wien bridge oscillator by means of adding a simple nonlinear cir- cuit as a load of one of the amplifier input terminals......A tutorial introduction to electrical oscilla- tors. Investigating Wien bridge oscillators as modified multi-vibrators. Introducing chaotic behavior into a Wien bridge oscillator by means of adding a simple nonlinear cir- cuit as a load of one of the amplifier input terminals...

  12. Numerical Simulation on the Liquid Bridge Formation by the Applied Electric Pulse

    Science.gov (United States)

    Hong, Jin Seok; Kang, In Seok

    2010-11-01

    In this work, liquid bridge (LB) formation by the applied electric field is analyzed numerically. Numerical simulation captures the temporal behavior of liquid surface during the LB formation between a top plate and a bottom nozzle. Numerical results show the three stages of LB formation; interface elevation, impact/fast spreading and slow spreading/stabilization. The effect of the applied voltage pulse is also studied in terms of minimal electrical energy for LB formation. Non-linear behavior such as bubble trapping at the impact of liquid to plate is also captured and explained qualitatively. Grounded and floating plate is considered. The wetting criterion for LB formation is suggested and explained in terms of capillary pressure. The linear decrease of the final contact radius with the top plate contact angle is shown from the numerical results. In addition, the effects of the liquid properties on the dynamics are briefly discussed.

  13. Real-time and wearable functional electrical stimulation system for volitional hand motor function control using the electromyography bridge method

    Directory of Open Access Journals (Sweden)

    Hai-peng Wang

    2017-01-01

    Full Text Available Voluntary participation of hemiplegic patients is crucial for functional electrical stimulation therapy. A wearable functional electrical stimulation system has been proposed for real-time volitional hand motor function control using the electromyography bridge method. Through a series of novel design concepts, including the integration of a detecting circuit and an analog-to-digital converter, a miniaturized functional electrical stimulation circuit technique, a low-power super-regeneration chip for wireless receiving, and two wearable armbands, a prototype system has been established with reduced size, power, and overall cost. Based on wrist joint torque reproduction and classification experiments performed on six healthy subjects, the optimized surface electromyography thresholds and trained logistic regression classifier parameters were statistically chosen to establish wrist and hand motion control with high accuracy. Test results showed that wrist flexion/extension, hand grasp, and finger extension could be reproduced with high accuracy and low latency. This system can build a bridge of information transmission between healthy limbs and paralyzed limbs, effectively improve voluntary participation of hemiplegic patients, and elevate efficiency of rehabilitation training.

  14. Significant manipulation of output performance of a bridge-structured spin valve magnetoresistance sensor via an electric field

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Yue; Yan, Baiqian; Ou-Yang, Jun; Zhu, Benpeng; Chen, Shi; Yang, Xiaofei, E-mail: hust-yangxiaofei@163.com [School of Optical and Electronic Information, Huazhong University of Science and Technology, Wuhan 430074 (China); Wang, Xianghao [School of Information Engineering, Wuhan University of Technology, Wuhan 430070 (China)

    2016-01-28

    Through principles of spin-valve giant magnetoresistance (SV-GMR) effect and its application in magnetic sensors, we have investigated electric-field control of the output performance of a bridge-structured Co/Cu/NiFe/IrMn SV-GMR sensor on a PZN-PT piezoelectric substrate using the micro-magnetic simulation. We centered on the influence of the variation of uniaxial magnetic anisotropy constant (K) of Co on the output of the bridge, and K was manipulated via the stress of Co, which is generated from the strain of a piezoelectric substrate under an electric field. The results indicate that when K varies between 2 × 10{sup 4 }J/m{sup 3} and 10 × 10{sup 4 }J/m{sup 3}, the output performance can be significantly manipulated: The linear range alters from between −330 Oe and 330 Oe to between −650 Oe and 650 Oe, and the sensitivity is tuned by almost 7 times, making it possible to measure magnetic fields with very different ranges. According to the converse piezoelectric effect, we have found that this variation of K can be realized by applying an electric field with the magnitude of about 2–20 kV/cm on a PZN-PT piezoelectric substrate, which is realistic in application. This result means that electric-control of SV-GMR effect has potential application in developing SV-GMR sensors with improved performance.

  15. Significant manipulation of output performance of a bridge-structured spin valve magnetoresistance sensor via an electric field

    International Nuclear Information System (INIS)

    Zhang, Yue; Yan, Baiqian; Ou-Yang, Jun; Zhu, Benpeng; Chen, Shi; Yang, Xiaofei; Wang, Xianghao

    2016-01-01

    Through principles of spin-valve giant magnetoresistance (SV-GMR) effect and its application in magnetic sensors, we have investigated electric-field control of the output performance of a bridge-structured Co/Cu/NiFe/IrMn SV-GMR sensor on a PZN-PT piezoelectric substrate using the micro-magnetic simulation. We centered on the influence of the variation of uniaxial magnetic anisotropy constant (K) of Co on the output of the bridge, and K was manipulated via the stress of Co, which is generated from the strain of a piezoelectric substrate under an electric field. The results indicate that when K varies between 2 × 10 4  J/m 3 and 10 × 10 4  J/m 3 , the output performance can be significantly manipulated: The linear range alters from between −330 Oe and 330 Oe to between −650 Oe and 650 Oe, and the sensitivity is tuned by almost 7 times, making it possible to measure magnetic fields with very different ranges. According to the converse piezoelectric effect, we have found that this variation of K can be realized by applying an electric field with the magnitude of about 2–20 kV/cm on a PZN-PT piezoelectric substrate, which is realistic in application. This result means that electric-control of SV-GMR effect has potential application in developing SV-GMR sensors with improved performance

  16. The likelihood of failures in the operation of the lifting mechanism electrical hook bridge crane

    Directory of Open Access Journals (Sweden)

    Ritenman I.L.

    2017-09-01

    Full Text Available Given the application of the methods of analysis of types and consequences of failures (FMEA analysis to assess the technical risk of occurrence of emergency situations during the operation of the lifting mechanism electrical hook bridge crane. The technique allows to identify the limiting elements and to determine the significance of effects in the design of the lifting mechanism, to develop measures to reduce the risk of the occurrence of an emergency.

  17. Floating liquid bridge charge dynamics

    Science.gov (United States)

    Teschke, Omar; Soares, David Mendez; Gomes, Whyllerson Evaristo; Valente Filho, Juracyr Ferraz

    2016-01-01

    The interaction of liquid with electric fields is investigated in a configuration where up to 13 kV are applied between electrodes resulting in a 106 V/m electric field in the capillaries and where there is the formation of a free-standing fluid bridge in the interelectrode gap. The Mott-Gurney equation was fitted to the measured ionization current vs applied voltage curve which indicates that the ionization rate at the high-voltage anode electrode dimethylsulfoxide (DMSO) interface and space charging in the interelectrode gap determine the floating liquid bridge current for a given cathode-to-anode voltage. Space charge effects were measured in the cathode becker and also at the liquid bridge since the ionized charges at the anode migrate to the bridge outer surface and decrease the interfacial tension from 43 mJ/m2 to 29 mJ/m2. Two distinct structural regions then form the bridge, a charged plastic (bulk modulus ˜100 MPa) conducting outer layer with a surface conductivity of ˜10-9 Ω-1, which shapes and supports the floating fluid structure, and an inner liquid cylinder, where DMSO molecules flow.

  18. Experimental investigation of the stability of the floating water bridge

    Science.gov (United States)

    Montazeri Namin, Reza; Azizpour Lindi, Shiva; Amjadi, Ahmad; Jafari, Nima; Irajizad, Peyman

    2013-09-01

    When a high voltage is applied between two beakers filled with deionized water, a floating bridge of water is formed in between exceeding the length of 2 cm when the beakers are pulled apart. Currently two theories regarding the stability of the floating water bridge exist, one suggesting that the tension caused by electric field in the dielectric medium is holding the bridge and the other suggesting surface tension to be responsible for the vertical equilibrium. We construct experiments in which the electric field and the geometry of the bridge are measured and compared with predictions of theories of the floating water bridge stability. We use a numerical simulation for estimation of the electric field. Our results indicate that the two forces of dielectric and surface tensions hold the bridge against gravity simultaneously and, having the same order of magnitude, neither of the two forces are negligible. In bridges with larger diameters, the effect of dielectric tension is slightly more in the vertical equilibrium than surface tension. Results show that the stability can be explained by macroscopic forces, regardless of the microscopic changes in the water structure.

  19. Building water bridges in air: Electrohydrodynamics of the floating water bridge

    Science.gov (United States)

    Marín, Álvaro G.; Lohse, Detlef

    2010-12-01

    The interaction of electrical fields and liquids can lead to a phenomenon that defies intuition. Some famous examples can be found in electrohydrodynamics as Taylor cones, whipping jets, or noncoalescing drops. A less famous example is the floating water bridge: a slender thread of water held between two glass beakers in which a high voltage difference is applied. Surprisingly, the water bridge defies gravity even when the beakers are separated at distances up to 2 cm. In this paper, experimental measurements and simple models are proposed and discussed for the stability of the bridge and the source of the flow, revealing an important role of polarization forces on the stability of the water bridge. On the other hand, the observed flow can only be explained due to the non-negligible free charge present in the surface. In this sense, the floating water bridge can be considered as an extreme case of a leaky dielectric liquid [J. R. Melcher and G. I. Taylor, Annu. Rev. Fluid Mech. 1, 111 (1969)].

  20. Building water bridges in air: Electrohydrodynamics of the floating water bridge

    NARCIS (Netherlands)

    Gomez Marin, Alvaro; Lohse, Detlef

    2010-01-01

    The interaction of electrical fields and liquids can lead to a phenomenon that defies intuition. Some famous examples can be found in electrohydrodynamics as Taylor cones, whipping jets, or noncoalescing drops. A less famous example is the floating water bridge: a slender thread of water held

  1. Experimental studies of influence of different electrodes on bridging in contaminated transformer oil

    OpenAIRE

    Mahmud, S.; Chen, G.; Golosnoy, I.O.; Wilson, G.; Jarman, P.

    2015-01-01

    Contaminated transformer oil has been tested under non uniform electric fields and the effect of different electrode systems presented in this paper. Three different electric fields were examined i.e. DC, AC and DC biased AC. These experiments revealed that with all the different electrodes arrangements, contaminated particles always formed bridges between electrodes under DC electric field. The bridges were thicker and more particles were attracted with more uniform electric field (spherical...

  2. Electrical modeling of semiconductor bridge (SCB) BNCP detonators with electrochemical capacitor firing sets

    Energy Technology Data Exchange (ETDEWEB)

    Marx, K.D. [Sandia National Labs., Livermore, CA (United States); Ingersoll, D.; Bickes, R.W. Jr. [Sandia National Labs., Albuquerque, NM (United States)

    1998-11-01

    In this paper the authors describe computer models that simulate the electrical characteristics and hence, the firing characteristics and performance of a semiconductor bridge (SCB) detonator for the initiation of BNCP [tetraammine-cis-bis (5-nitro-2H-tetrazolato-N{sup 2}) cobalt(III) perchlorate]. The electrical data and resultant models provide new insights into the fundamental behavior of SCB detonators, particularly with respect to the initiation mechanism and the interaction of the explosive powder with the SCB. One model developed, the Thermal Feedback Model, considers the total energy budget for the system, including the time evolution of the energy delivered to the powder by the electrical circuit, as well as that released by the ignition and subsequent chemical reaction of the powder. The authors also present data obtained using a new low-voltage firing set which employed an advanced electrochemical capacitor having a nominal capacitance of 350,000 {micro}F at 9 V, the maximum voltage rating for this particular device. A model for this firing set and detonator was developed by making measurements of the intrinsic capacitance and equivalent series resistance (ESR < 10 m{Omega}) of a single device. This model was then used to predict the behavior of BNCP SCB detonators fired alone, as well as in a multishot, parallel-string configuration using a firing set composed of either a single 9 V electrochemical capacitor or two of the capacitors wired in series and charged to 18 V.

  3. Method and device for current driven electric energy conversion

    DEFF Research Database (Denmark)

    2012-01-01

    Device comprising an electric power converter circuit for converting electric energy. The converter circuit comprises a switch arrangement with two or more controllable electric switches connected in a switching configuration and controlled so as to provide a current drive of electric energy from...... configurations such as half bridge buck, full bridge buck, half bridge boost, or full bridge boost. A current driven conversion is advantageous for high efficient energy conversion from current sources such as solar cells or where a voltage source is connected through long cables, e.g. powerline cables for long...... an associated electric source connected to a set of input terminals. This is obtained by the two or more electric swiches being connected and controlled to short-circuit the input terminals during a part of a switching period. Further, a low pass filter with a capacitor and an inductor are provided to low pass...

  4. Controlling the electrical properties of ZnO films by forming zinc and oxide bridges by a plasma and electron-assisted process

    Directory of Open Access Journals (Sweden)

    Norihiro Shimoi

    2012-06-01

    Full Text Available A new method to produce electrically steady ZnO films without any heating process has been developed by using plasma and electron beams to facilitate bonding between the metallic component and the oxygen on coated ZnO films. Both plasma atmosphere and electron beams can function as sources of nonequilibrium bonding energy, forming bridges between the zinc present in the zinc complex and the oxygen in the ZnO particles to construct a zinc-oxide thin film. Our results confirm that it is possible to achieve low conductive characteristics by controlling the acceleration voltage of electrons used to irradiate the ZnO coating. The electrically steady films fabricated have various potential applications, being particularly well-suited to electrical devices on a plastic medium.

  5. Controlling the electrical properties of ZnO films by forming zinc and oxide bridges by a plasma and electron-assisted process

    Energy Technology Data Exchange (ETDEWEB)

    Shimoi, Norihiro; Tanaka, Yasumitsu [Graduate School of Environmental Studies, Tohoku University, 6-6-20 Aoba, Aramaki, Aoba-ku, Sendai 980-8579 (Japan); Harada, Takamitsu [Sendai Technology Center, Consumer-Professional and Devices Group, Sony Corporation, 3-4-1 Sakuragi, Tagajo 985-0842 (Japan); Tanaka, Shun-ichiro [Institute of Multidisciplinary Research for Advanced Materials, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai 980-8577 (Japan)

    2012-06-15

    A new method to produce electrically steady ZnO films without any heating process has been developed by using plasma and electron beams to facilitate bonding between the metallic component and the oxygen on coated ZnO films. Both plasma atmosphere and electron beams can function as sources of nonequilibrium bonding energy, forming bridges between the zinc present in the zinc complex and the oxygen in the ZnO particles to construct a zinc-oxide thin film. Our results confirm that it is possible to achieve low conductive characteristics by controlling the acceleration voltage of electrons used to irradiate the ZnO coating. The electrically steady films fabricated have various potential applications, being particularly well-suited to electrical devices on a plastic medium.

  6. Energy harvesting on highway bridges.

    Science.gov (United States)

    2011-01-01

    A concept for harvesting energy from the traffic-induced loadings on a highway bridge using piezoelectric : materials to generate electricity was explored through the prototype stage. A total of sixteen lead-zirconate : titanate (PZT) Type 5A piezoel...

  7. Germanium-overcoated niobium Dayem bridges

    International Nuclear Information System (INIS)

    Holdeman, L.B.; Peters, P.N.

    1976-01-01

    Overcoating constriction microbridges with semiconducting germanium provides additional thermal conductivity at liquid-helium temperatures to reduce the effects of self-heating in these Josephson junctions. Microwave-induced steps were observed in the I-V characteristics of an overcoated Dayem bridge fabricated in a 15-nm-thick niobium film; at 4.2 K (T/sub c/-T=2.6 K), at least 20 steps could be counted. No steps were observed in the I-V characteristics of the bridge prior to overcoating. In addition, the germanium overcoat can protect against electrical disturbances at room temperature

  8. Hybrid Modulation of Bidirectional Three-Phase Dual-Active-Bridge DC Converters for Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Yen-Ching Wang

    2016-06-01

    Full Text Available Bidirectional power converters for electric vehicles (EVs have received much attention recently, due to either grid-supporting requirements or emergent power supplies. This paper proposes a hybrid modulation of the three-phase dual-active bridge (3ΦDAB converter for EV charging systems. The designed hybrid modulation allows the converter to switch its modulation between phase-shifted and trapezoidal modes to increase the conversion efficiency, even under light-load conditions. The mode transition is realized in a real-time manner according to the charging or discharging current. The operation principle of the converter is analyzed in different modes and thus design considerations of the modulation are derived. A lab-scaled prototype circuit with a 48V/20Ah LiFePO4 battery is established to validate the feasibility and effectiveness.

  9. Raman scattering measurements on a floating water bridge

    Energy Technology Data Exchange (ETDEWEB)

    Ponterio, R C; Aliotta, F; Vasi, C; Fontanella, M E; Saija, F [CNR-Istituto per i Processi Chimico-Fisici, V.le F. D' Alcontres 37, 98158, Messina (Italy); Pochylski, M [Faculty of Physics, Adam Mickiewicz University, ul. Umultowska 85, 61-614 Poznan (Poland)

    2010-05-05

    It was observed that when polarized by an intense electric field, water is able to self-arrange into macroscopic cylindrical wires that can hang up and remain floating against gravity. This phenomenon is now known as a 'water bridge'. Several attempts have been made to give an explanation of this apparently unusual behaviour of water. A number of experiments have been performed with the aim of probing any possible structural change of bulk water, after application of the electric field. None of the available findings appear conclusive at the moment. Here we report the results of the first Raman scattering experiment on floating water bridges. The inter-molecular OH-stretching band has been investigated and the results have been compared with those from bulk water. Some changes in the scattering profiles after application of the electric field are shown to have a structural origin. The bridges have been obtained, for the first time, in a vertical geometry and under application of an alternating field. The adopted geometry has allowed us to reveal a clear asymmetry between opposite direct current biasing, which can be related to the nature of the charge carriers.

  10. Raman scattering measurements on a floating water bridge

    International Nuclear Information System (INIS)

    Ponterio, R C; Aliotta, F; Vasi, C; Fontanella, M E; Saija, F; Pochylski, M

    2010-01-01

    It was observed that when polarized by an intense electric field, water is able to self-arrange into macroscopic cylindrical wires that can hang up and remain floating against gravity. This phenomenon is now known as a 'water bridge'. Several attempts have been made to give an explanation of this apparently unusual behaviour of water. A number of experiments have been performed with the aim of probing any possible structural change of bulk water, after application of the electric field. None of the available findings appear conclusive at the moment. Here we report the results of the first Raman scattering experiment on floating water bridges. The inter-molecular OH-stretching band has been investigated and the results have been compared with those from bulk water. Some changes in the scattering profiles after application of the electric field are shown to have a structural origin. The bridges have been obtained, for the first time, in a vertical geometry and under application of an alternating field. The adopted geometry has allowed us to reveal a clear asymmetry between opposite direct current biasing, which can be related to the nature of the charge carriers.

  11. Raman scattering measurements on a floating water bridge

    Science.gov (United States)

    Ponterio, R. C.; Pochylski, M.; Aliotta, F.; Vasi, C.; Fontanella, M. E.; Saija, F.

    2010-05-01

    It was observed that when polarized by an intense electric field, water is able to self-arrange into macroscopic cylindrical wires that can hang up and remain floating against gravity. This phenomenon is now known as a 'water bridge'. Several attempts have been made to give an explanation of this apparently unusual behaviour of water. A number of experiments have been performed with the aim of probing any possible structural change of bulk water, after application of the electric field. None of the available findings appear conclusive at the moment. Here we report the results of the first Raman scattering experiment on floating water bridges. The inter-molecular OH-stretching band has been investigated and the results have been compared with those from bulk water. Some changes in the scattering profiles after application of the electric field are shown to have a structural origin. The bridges have been obtained, for the first time, in a vertical geometry and under application of an alternating field. The adopted geometry has allowed us to reveal a clear asymmetry between opposite direct current biasing, which can be related to the nature of the charge carriers.

  12. The likelihood of failures in the operation of the mechanism of movement of a cargo truck electrical hook bridge crane

    Directory of Open Access Journals (Sweden)

    Ritenman I.L.

    2018-03-01

    Full Text Available Given the application of the methods of analysis of types and consequences of failures (FMEA analysis to assess the technical risk of occurrence of emergency situations during the operation of the lifting mechanism electrical hook bridge crane. The technique allows to identify the limiting elements and to determine the significance of effects in the design of the lifting mechanism, to develop measures to reduce the risk of the occurrence of an emergency.

  13. The likelihood of failures in the operation of the mechanism of movement of a cargo truck electrical hook bridge crane

    Directory of Open Access Journals (Sweden)

    Ritenman I.L.

    2017-12-01

    Full Text Available Given the application of the methods of analysis of types and consequences of failures (FMEA analysis to assess the technical risk of occurrence of emergency situations during the operation of the lifting mechanism electrical hook bridge crane. The technique allows to identify the limiting elements and to determine the significance of effects in the design of the lifting mechanism, to develop measures to reduce the risk of the occurrence of an emergency.

  14. Half bridge resonant converter for ignition of thermal plasmas

    International Nuclear Information System (INIS)

    Pena E, L.

    1997-01-01

    In this work the background, design, implementation and performance of a half bridge resonant converter (HBRC) used as an electronic ignition system for arc plasma torch generation is presented. The significance of the design lies in its simplicity, versatility and low cost. The system operates like a high voltage supply attached to electrodes before gaseous breakdown and like open circuit when electric arc is established. Resonant converter is implemented with a high voltage and high speed power driver intended for control the power MOSFET transistors connected in half bridge topology with L C load. The HBRC operates besides interference into domestic electric supply line (120 V, 60 Hz) as well electric measurement devices. Advantages and limitations of the converter are reviewed. Experimental impedance variation in the medium as a function of frequency operation and some experiences in striking arcs are also presented. (Author)

  15. Electric fields and quantum wormholes

    NARCIS (Netherlands)

    Engelhardt, D.; Freivogel, B.; Iqbal, N.

    2015-01-01

    Electric fields can thread a classical Einstein-Rosen bridge. Maldacena and Susskind have recently suggested that in a theory of dynamical gravity the entanglement of ordinary perturbative quanta should be viewed as creating a quantum version of an Einstein-Rosen bridge between the particles, or a

  16. Self-catalytic growth of unmodified gold nanoparticles as conductive bridges mediated gap-electrical signal transduction for DNA hybridization detection.

    Science.gov (United States)

    Zhang, Jing; Nie, Huagui; Wu, Zhan; Yang, Zhi; Zhang, Lijie; Xu, Xiangju; Huang, Shaoming

    2014-01-21

    A simple and sensitive gap-electrical biosensor based on self-catalytic growth of unmodified gold nanoparticles (AuNPs) as conductive bridges has been developed for amplifying DNA hybridization events. In this strategy, the signal amplification degree of such conductive bridges is closely related to the variation of the glucose oxidase (GOx)-like catalytic activity of AuNPs upon interaction with single- and double-stranded DNA (ssDNA and dsDNA), respectively. In the presence of target DNA, the obtained dsDNA product cannot adsorb onto the surface of AuNPs due to electrostatic interaction, which makes the unmodified AuNPs exhibit excellent GOx-like catalytic activity. Such catalytic activity can enlarge the diameters of AuNPs in the glucose and HAuCl4 solution and result in a connection between most of the AuNPs and a conductive gold film formation with a dramatically increased conductance. For the control sample, the catalytic activity sites of AuNPs are fully blocked by ssDNA due to the noncovalent interaction between nucleotide bases and AuNPs. Thus, the growth of the assembled AuNPs will not happen and the conductance between microelectrodes will be not changed. Under the optimal experimental conditions, the developed strategy exhibited a sensitive response to target DNA with a high signal-to-noise ratio. Moreover, this strategy was also demonstrated to provide excellent differentiation ability for single-nucleotide polymorphism. Such performances indicated the great potential of this label-free electrical strategy for clinical diagnostics and genetic analysis under real biological sample separation.

  17. Sustainability of bridge foundations using electrical resistivity imaging and induced polarization to support transportation safety.

    Science.gov (United States)

    2014-04-01

    As of September 2007, there were 67,240 U.S. bridges in the National Bridge Inventory classified as having unknown : foundations (FHWA 2008). The bridges spanning rivers are of critical importance due to the risks of potential scour. In fact, it is :...

  18. Copper ion fluxes through the floating water bridge under strong electric potential.

    Science.gov (United States)

    Giuliani, Livio; D'Emilia, Enrico; Lisi, Antonella; Grimaldi, Settimio; Brizhik, Larissa; Del Giudice, Emilio

    2015-01-01

    We have performed a series of experiments applying high voltage between two electrodes, immersed in two beakers containing bidistilled water in a way similar to experiments conducted by Fuchs and collaborators, which showed that a water bridge can be formed between the two containers. We also observed the formation of water bridge. Moreover, choosing different pairs of electrodes depending on the material they are made up of, we observed that copper ions flow can pass along the bridge if the negative electrode is made up of copper. We show that the direction of the flux not only depends on the applied electrostatic field but on the relative electronegativity of the electrodes too. These results open new perspectives in understanding the properties of water. We suggest a possible explanation of the obtained results.

  19. MAFIA simulation and cold model test of three types of bridge coupler

    International Nuclear Information System (INIS)

    Chang, C.R.; Yao, C.G.; Swenson, D.A.; Funk, L.W.; Raparia, D.

    1992-01-01

    In the new design of the SSC CCL, the total number of bridge couplers has increased from 50 to 63, and their maximum length increased from 37.2 to 46.1 cm. Choosing a bridge coupler that gives maximum coupling, minimum power flow, phase shift and fabrication cost becomes important. The conventional TM010 single cavity bridge coupler used in LAMPF and Fermilab will have severe mode mixing problem when the bridge length is over 30 cm, and the coupling is very weak. Three types of bridge coupler have been proposed: (1) TM012 single cavity bridge coupler; (2) electrically coupled multi-cavity bridge coupler and (3) magnetically coupled multi-cavity bridge coupler. This paper presents both MAFIA simulations and cold model tests results. Each bridge coupler has its unique characteristics with advantages and disadvantages, but all three are superior to the conventional coupler. (Author) 6 figs., tab., 2 refs

  20. Method of controlling switching of a multiphase inductor-converter bridge. [Patent application

    Science.gov (United States)

    Kustom, R.L.; Fuja, R.E.

    In an inductor-convertor circuit for transferring electrical energy between a storage coil and a load coil through a storage thyristor bridge, a load thyristor bridge, and a set of commutating capacitors, operation is improved by a method of changing the rate of delivery of energy in a given direction. The change in rate corresponds to a predetermined change in phase angle between the load bridge and the storage bridge, and comprises changing the phase of the bridge by two steps, each equal to half the predetermined change and occurring 180/sup 0/ apart. The method assures commutation and minimizes imbalances that lead otherwise to overvoltages. 11 figures.

  1. Floating and flying ferrofluid bridges induced by external magnetic fields

    Science.gov (United States)

    Ma, Rongchao; Zhou, Yixin; Liu, Jing

    2015-04-01

    A ferrofluid is a mixture that exhibits both magnetism and fluidity. This merit enables the ferrofluid to be used in a wide variety of areas. Here we show that a floating ferrofluid bridge can be induced between two separated boards under a balanced external magnetic field generated by two magnets, while a flying ferrofluid bridge can be induced under an unbalanced external magnetic field generated by only one magnet. The mechanisms of the ferrofluid bridges were discussed and the corresponding mathematical equations were also established to describe the interacting magnetic force between the ferro particles inside the ferrofluid. This work answered a basic question that, except for the well-known floating water bridges that are related to electricity, one can also build up a liquid bridge that is related to magnetism.

  2. Structural behavior of concrete box bridge using embedded FBG sensors

    Science.gov (United States)

    Chung, Wonseok; Kang, Donghoon

    2012-04-01

    For the structural monitoring of railway bridges, electromagnetic interference (EMI) is a significant problem as modern railway lines are powered by high-voltage electric power feeding systems. Fiber optic sensing systems are free from EMI and have been successfully applied in civil engineering fields. This study presents the application of fiber Bragg grating (FBG)-based sensing systems to precast concrete box railway bridges. A 20 m long full-scale precast concrete box railway girder was fabricated and tested in order to identify its static performance. The experimental program involved the measurement of the nonlinear static behavior until failure. Multiplexed FBG strain sensors were embedded along the length of steel rebar and a strain-induced wavelength shift was measured in order to monitor internal strains. The measured values from the FBG-based sensors are compared with the results using electric signal-based sensors. The results show that the FBG sensing system is promising and can improve the efficiency of structural monitoring for modern railway bridges.

  3. Cross-Quint-Bridge Resistor

    Science.gov (United States)

    Hannaman, David J.; Lieneweg, Udo; Buehler, Martin G.; Mantalas, Linda

    1991-01-01

    Integrated-circuit conductive test pattern intended to provide data on effects of design widths and design spacings upon actual widths of conductive lines. Provides for electrical measurements both on lines of unknown width and on features having known dimensions. Data from measurements on five bridges used to determine four parameters of mathematical model describing system. In principle, pattern determines effects of width and spacing and interaction between them.

  4. An overheight vehicle bridge collision monitoring system using piezoelectric transducers

    Science.gov (United States)

    Song, G.; Olmi, C.; Gu, H.

    2007-04-01

    With increasing traffic volume follows an increase in the number of overheight truck collisions with highway bridges. The detection of collision impact and evaluation of the impact level is a critical issue in the maintenance of a concrete bridge. In this paper, an overheight collision detection and evaluation system is developed for concrete bridge girders using piezoelectric transducers. An electric circuit is designed to detect the impact and to activate a digital camera to take photos of the offending truck. Impact tests and a health monitoring test were conducted on a model concrete bridge girder by using three piezoelectric transducers embedded before casting. From the experimental data of the impact test, it can be seen that there is a linear relation between the output of sensor energy and the impact energy. The health monitoring results show that the proposed damage index indicates the level of damage inside the model concrete bridge girder. The proposed overheight truck-bridge collision detection and evaluation system has the potential to be applied to the safety monitoring of highway bridges.

  5. INCREASED RELIABILITY OF ELECTRIC BLASTING

    OpenAIRE

    Kashuba, Oleh Ivanovych; Skliarov, L I; Skliarov, A L

    2017-01-01

    The problems of improving reliability of an electric blasting method using electric detonators with nichrome filament bridges. It was revealed that in the calculation of the total resistance of the explosive network it is necessary to increase to 24% of the nominal value

  6. 49 CFR 236.757 - Lock, electric.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Lock, electric. 236.757 Section 236.757... Lock, electric. A device to prevent or restrict the movement of a lever, a switch or a movable bridge, unless the locking member is withdrawn by an electrical device, such as an electromagnet, solenoid or...

  7. Aqueous electrolyte surfaces in strong electric fields: molecular insight into nanoscale jets and bridges

    Science.gov (United States)

    Jirsák, Jan; Moučka, Filip; Škvor, Jiří; Nezbeda, Ivo

    2015-04-01

    Exposing aqueous surfaces to a strong electric field gives rise to interesting phenomena, such as formation of a floating water bridge or an eruption of a jet in electrospinning. In an effort to account for the phenomena at the molecular level, we performed molecular dynamics simulations using several protocols on both pure water and aqueous solutions of sodium chloride subjected to an electrostatic field. All simulations consistently point to the same mechanisms which govern the rearrangement of the originally planar surface. The results show that the phenomena are primarily governed by an orientational reordering of the water molecules driven by the applied field. It is demonstrated that, for pure water, a sufficiently strong field yields a columnar structure parallel to the field with an anisotropic arrangement of the water molecules with their dipole moments aligned along the applied field not only in the surface layer but over the entire cross section of the column. Nonetheless, the number of hydrogen bonds per molecule does not seem to be affected by the field regardless of its strength and molecule's orientation. In the electrolyte solutions, the ionic charge is able to overcome the effect of the external field tending to arrange the water molecules radially in the first coordination shell of an ion. The ion-water interaction interferes thus with the water-electric field interaction, and the competition between these two forces (i.e., strength of the field versus concentration) provides the key mechanism determining the stability of the observed structures.

  8. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  9. Raman scattering investigation of the water-bridge phenomenon: Some preliminary results

    Directory of Open Access Journals (Sweden)

    Francesco Aliotta

    2010-09-01

    Full Text Available A floating water-bridge is formed if a high-voltage direct current is applied between two beakers filled of chemically pure water. Raman spectra of the OH-stretching region have been obtained at ambient condition of temperature and pressure. These preliminary results seem to indicate that the hydrogen-bond structure is only slightly modified by the presence of the electric field applied to form the floating water-bridge in agreement with recent neutron scattering investigation. In fact, the polarized Raman spectrum of the pure water and of the water-bridge is almost superimposable. We are planning to carry out further spectroscopic analysis, at different thermodynamic conditions, for better understanding the role played by the hydrogen-bond in driving the formation of the floating water-bridge.

  10. Vertically oriented graphene bridging active-layer/current-collector interface for ultrahigh rate supercapacitors.

    Science.gov (United States)

    Bo, Zheng; Zhu, Weiguang; Ma, Wei; Wen, Zhenhai; Shuai, Xiaorui; Chen, Junhong; Yan, Jianhua; Wang, Zhihua; Cen, Kefa; Feng, Xinliang

    2013-10-25

    Dense networks of graphene nanosheets standing vertically on a current collector can work as numerous electrically conductive bridges to facilitate charge transport and mitigate the constriction/spreading resistance at the interface between the active material and the current collector. The vertically oriented graphene-bridged supercapacitors present excellent rate and power capabilities. © 2013 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  11. Theory of the Maxwell pressure tensor and the tension in a water bridge.

    Science.gov (United States)

    Widom, A; Swain, J; Silverberg, J; Sivasubramanian, S; Srivastava, Y N

    2009-07-01

    A water bridge refers to an experimental "flexible cable" made up of pure de-ionized water, which can hang across two supports maintained with a sufficiently large voltage difference. The resulting electric fields within the de-ionized water flexible cable maintain a tension that sustains the water against the downward force of gravity. A detailed calculation of the water bridge tension will be provided in terms of the Maxwell pressure tensor in a dielectric fluid medium. General properties of the dielectric liquid pressure tensor are discussed along with unusual features of dielectric fluid Bernoulli flows in an electric field. The "frictionless" Bernoulli flow is closely analogous to that of a superfluid.

  12. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  13. Shockwave generation by a semiconductor bridge operation in water

    Energy Technology Data Exchange (ETDEWEB)

    Zvulun, E.; Toker, G.; Gurovich, V. Tz.; Krasik, Ya. E. [Physics Department, Technion, Haifa 32000 (Israel)

    2014-05-28

    A semiconductor bridge (SCB) is a silicon device, used in explosive systems as the electrical initiator element. In recent years, SCB plasma has been extensively studied, both electrically and using fast photography and spectroscopic imaging. However, the value of the pressure buildup at the bridge remains unknown. In this study, we operated SCB devices in water and, using shadow imaging and reference beam interferometry, obtained the velocity of the shock wave propagation and distribution of the density of water. These results, together with a self-similar hydrodynamic model, were used to calculate the pressure generated by the exploding SCB. In addition, the results obtained showed that the energy of the water flow exceeds significantly the energy deposited into the exploded SCB. The latter can be explained by the combustion of the aluminum and silicon atoms released in water, which acts as an oxidizing medium.

  14. Electric-gun studies of conductors in high magnetic fields and experiments in dynamic flux compression

    International Nuclear Information System (INIS)

    Osher, J.E.; Chau, H.H.; Lee, R.S.; Tipton, R.E.; Weingart, R.C.

    1990-01-01

    Electric guns operate by discharging a fast capacitor bank through a thin, metallic bridge-foil load. The explosion of the foil and the accompanying magnetic forces acting on the bridge-foil plasma accelerate a thin flyer plate of dielectric material initially placed on top of the bridge foil. In hypervelocity impact studies with the linear electric gun, a thin, flat flyer is punched out of a cover sheet of dielectric (or dielectric/metallic composite) material by the explosion of the bridge foil and accelerated down a short barrel to impact on a target. In the coaxial gun, a cylindrical bridge foil is used to implode a cylindrical dielectric or dielectric/metallic composite (liner) flyer to produce a high peak compression through axial convergence. In this paper the authors discuss the range of currents, their rate of rise, and the magnetic fields attained by their fast capacitor banks, which supply power to the electric gun to explode the bridge foil. Also included is a study of the change of resistance of the bridge-foil element as a function of time for various flyer mass loadings for the linear geometry of the gun

  15. A new solution of measuring thermal response of prestressed concrete bridge girders for structural health monitoring

    International Nuclear Information System (INIS)

    Jiao, Pengcheng; Borchani, Wassim; Hasni, Hassene; Lajnef, Nizar

    2017-01-01

    This study develops a novel buckling-based mechanism to measure the thermal response of prestressed concrete bridge girders under continuous temperature changes for structural health monitoring. The measuring device consists of a bilaterally constrained beam and a piezoelectric polyvinylidene fluoride transducer that is attached to the beam. Under thermally induced displacement, the slender beam is buckled. The post-buckling events are deployed to convert the low-rate and low-frequency excitations into localized high-rate motions and, therefore, the attached piezoelectric transducer is triggered to generate electrical signals. Attaching the measuring device to concrete bridge girders, the electrical signals are used to detect the thermal response of concrete bridges. Finite element simulations are conducted to obtain the displacement of prestressed concrete girders under thermal loads. Using the thermal-induced displacement as input, experiments are carried out on a 3D printed measuring device to investigate the buckling response and corresponding electrical signals. A theoretical model is developed based on the nonlinear Euler–Bernoulli beam theory and large deformation assumptions to predict the buckling mode transitions of the beam. Based on the presented theoretical model, the geometry properties of the measuring device can be designed such that its buckling response is effectively controlled. Consequently, the thermally induced displacement can be designed as limit states to detect excessive thermal loads on concrete bridge girders. The proposed solution sufficiently measures the thermal response of concrete bridges. (paper)

  16. A new solution of measuring thermal response of prestressed concrete bridge girders for structural health monitoring

    Science.gov (United States)

    Jiao, Pengcheng; Borchani, Wassim; Hasni, Hassene; Lajnef, Nizar

    2017-08-01

    This study develops a novel buckling-based mechanism to measure the thermal response of prestressed concrete bridge girders under continuous temperature changes for structural health monitoring. The measuring device consists of a bilaterally constrained beam and a piezoelectric polyvinylidene fluoride transducer that is attached to the beam. Under thermally induced displacement, the slender beam is buckled. The post-buckling events are deployed to convert the low-rate and low-frequency excitations into localized high-rate motions and, therefore, the attached piezoelectric transducer is triggered to generate electrical signals. Attaching the measuring device to concrete bridge girders, the electrical signals are used to detect the thermal response of concrete bridges. Finite element simulations are conducted to obtain the displacement of prestressed concrete girders under thermal loads. Using the thermal-induced displacement as input, experiments are carried out on a 3D printed measuring device to investigate the buckling response and corresponding electrical signals. A theoretical model is developed based on the nonlinear Euler-Bernoulli beam theory and large deformation assumptions to predict the buckling mode transitions of the beam. Based on the presented theoretical model, the geometry properties of the measuring device can be designed such that its buckling response is effectively controlled. Consequently, the thermally induced displacement can be designed as limit states to detect excessive thermal loads on concrete bridge girders. The proposed solution sufficiently measures the thermal response of concrete bridges.

  17. Detection and characterization of corrosion of bridge cables by time domain reflectometry

    Science.gov (United States)

    Liu, Wei; Hunsperger, Robert G.; Folliard, Kevin; Chajes, Michael J.; Barot, Jignesh; Jhaveri, Darshan; Kunz, Eric

    1999-02-01

    In this paper, we develop and demonstrate a nondestructive evaluation technique for corrosion detection of embedded or encased steel cables. This technique utilizes time domain reflectometry (TDR), which has been traditionally used to detect electrical discontinuities in transmission lines. By applying a sensor wire along with the bridge cable, we can model the cable as an asymmetric, twin-conductor transmission line. Physical defects of the bridge cable will change the electromagnetic properties of the line and can be detected by TDR. Furthermore, different types of defects can be modeled analytically, and identified using TDR. TDR measurement results from several fabricated bridge cable sections with built-in defects are reported.

  18. Myocardial Bridge

    Science.gov (United States)

    ... Center > Myocardial Bridge Menu Topics Topics FAQs Myocardial Bridge En español Your heart is made of muscle, ... surface of the heart. What is a myocardial bridge? A myocardial bridge is a band of heart ...

  19. Bridging Climate Change Resilience and Mitigation in the Electricity Sector Through Renewable Energy and Energy Efficiency: Emerging Climate Change and Development Topics for Energy Sector Transformation

    Energy Technology Data Exchange (ETDEWEB)

    Cox, Sarah L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hotchkiss, Elizabeth L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bilello, Daniel E [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Watson, Andrea C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Holm, Alison [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-11-03

    Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growing electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.

  20. Two-dimensional neutron scattering in a floating heavy water bridge

    International Nuclear Information System (INIS)

    Fuchs, Elmar C; Baroni, Patrick; Noirez, Laurence; Bitschnau, Brigitte

    2010-01-01

    When a high voltage is applied to pure water in two filled beakers kept close to each other, a connection forms spontaneously, giving the impression of a floating water bridge. This phenomenon is of special interest, since it comprises a number of phenomena currently tackled in modern water science. In this work, the first two-dimensional structural study of a floating heavy water bridge is presented as a function of the azimuthal angle. A small anisotropy in the angular distribution of the intensity of the first structural peak was observed, indicating a preferred orientation of a part of the D 2 O molecules along the electric field lines without breaking the local tetrahedral symmetry. The experiment is carried out by neutron scattering on a D 2 O bridge.

  1. Two-dimensional neutron scattering in a floating heavy water bridge

    Science.gov (United States)

    Fuchs, Elmar C.; Baroni, Patrick; Bitschnau, Brigitte; Noirez, Laurence

    2010-03-01

    When a high voltage is applied to pure water in two filled beakers kept close to each other, a connection forms spontaneously, giving the impression of a floating water bridge. This phenomenon is of special interest, since it comprises a number of phenomena currently tackled in modern water science. In this work, the first two-dimensional structural study of a floating heavy water bridge is presented as a function of the azimuthal angle. A small anisotropy in the angular distribution of the intensity of the first structural peak was observed, indicating a preferred orientation of a part of the D2O molecules along the electric field lines without breaking the local tetrahedral symmetry. The experiment is carried out by neutron scattering on a D2O bridge.

  2. Split-cross-bridge resistor for testing for proper fabrication of integrated circuits

    Science.gov (United States)

    Buehler, M. G. (Inventor)

    1985-01-01

    An electrical testing structure and method is described whereby a test structure is fabricated on a large scale integrated circuit wafer along with the circuit components and has a van der Pauw cross resistor in conjunction with a bridge resistor and a split bridge resistor, the latter having two channels each a line width wide, corresponding to the line width of the wafer circuit components, and with the two channels separated by a space equal to the line spacing of the wafer circuit components. The testing structure has associated voltage and current contact pads arranged in a two by four array for conveniently passing currents through the test structure and measuring voltages at appropriate points to calculate the sheet resistance, line width, line spacing, and line pitch of the circuit components on the wafer electrically.

  3. The Akashi Kaikyo Bridge and the Storebælt Bridge

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1999-01-01

    With the completion of the Akashi Kaikyo Bridge and the Storebælt East Bridge the development of the suspension bridge technology in the 20th century has manifested itself in two impressive structures. With the present echnology may bridges of similar (and also more modest) dimensions...... will undoubtedly be built far into the next century. For bridges going beyond the spans of existing bridges it is, however, likely that new concepts will be developed....

  4. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  5. Evaluation of high temperature superconductive thermal bridges for space borne cryogenic detectors

    Science.gov (United States)

    Scott, Elaine P.

    1996-01-01

    Infrared sensor satellites are used to monitor the conditions in the earth's upper atmosphere. In these systems, the electronic links connecting the cryogenically cooled infrared detectors to the significantly warmer amplification electronics act as thermal bridges and, consequently, the mission lifetimes of the satellites are limited due to cryogenic evaporation. High-temperature superconductor (HTS) materials have been proposed by researchers at the National Aeronautics and Space Administration Langley's Research Center (NASA-LaRC) as an alternative to the currently used manganin wires for electrical connection. The potential for using HTS films as thermal bridges has provided the motivation for the design and the analysis of a spaceflight experiment to evaluate the performance of this superconductive technology in the space environment. The initial efforts were focused on the preliminary design of the experimental system which allows for the quantitative comparison of superconductive leads with manganin leads, and on the thermal conduction modeling of the proposed system. Most of the HTS materials were indicated to be potential replacements for the manganin wires. In the continuation of this multi-year research, the objectives of this study were to evaluate the sources of heat transfer on the thermal bridges that have been neglected in the preliminary conductive model and then to develop a methodology for the estimation of the thermal conductivities of the HTS thermal bridges in space. The Joule heating created by the electrical current through the manganin wires was incorporated as a volumetric heat source into the manganin conductive model. The radiative heat source on the HTS thermal bridges was determined by performing a separate radiant interchange analysis within a high-T(sub c) superconductor housing area. Both heat sources indicated no significant contribution on the cryogenic heat load, which validates the results obtained in the preliminary conduction

  6. Tidal Energy Conversion Installation at an Estuarine Bridge Site: Resource Evaluation and Energy Production Estimate

    Science.gov (United States)

    Wosnik, M.; Gagnon, I.; Baldwin, K.; Bell, E.

    2015-12-01

    The "Living Bridge" project aims to create a self-diagnosing, self-reporting "smart bridge" powered by a local renewable energy source, tidal energy - transforming Memorial Bridge, a vertical lift bridge over the tidal Piscataqua River connecting Portsmouth, NH and Kittery, ME, into a living laboratory for researchers, engineers, scientists, and the community. The Living Bridge project includes the installation of a tidal turbine at the Memorial Bridge. The energy converted by the turbine will power structural health monitoring, environmental and underwater instrumentation. Utilizing locally available tidal energy can make bridge operation more sustainable, can "harden" transportation infrastructure against prolonged grid outages and can demonstrate a prototype of an "estuarine bridge of the future". A spatio-temporal tidal energy resource assessment was performed using long term bottom-deployed Acoustic Doppler Current Profilers (ADCP) at two locations: near the planned deployment location in 2013-14 for 123 days and mid-channel in 2007 for 35 days. Data were evaluated to determine the amount of available kinetic energy that can be converted into usable electrical energy on the bridge. Changes in available kinetic energy with ebb/flood and spring/neap tidal cycles and electrical energy demand were analyzed. The target deployment site exhibited significantly more energetic ebb tides than flood tides, which can be explained by the local bathymetry of the tidal estuary. A system model is used to calculate the net energy savings using various tidal generator and battery bank configurations. Different resource evaluation methodologies were also analyzed, e.g., using a representative ADCP "bin" vs. a more refined, turbine-geometry-specific methodology, and using static bin height vs. bin height that move w.r.t. the free surface throughout a tidal cycle (representative of a bottom-fixed or floating turbine deployment, respectively). ADCP operating frequencies and bin

  7. Railroad Bridges

    Data.gov (United States)

    Department of Homeland Security — Bridges-Rail in the United States According to The National Bridge Inspection Standards published in the Code of Federal Regulations (23 CFR 650.3), a bridge isA...

  8. Implementation of Bridge Management System on Interurban Bridge in Maluku Province

    Directory of Open Access Journals (Sweden)

    Erwin Marasabessy

    2015-05-01

    Full Text Available Bridges as transport infrastructures play a vital role in smoothing traffic flows. The success of a bridge in playing its role and serving its function depends on its management. The Directorate General of Highways of the Ministry of Public Work has used a system to manage bridges known as the Bridge Management System (BMS. The system allows a systematic plan and provides a uniform procedure for all bridge operation activities on the national and provincial level. Data from Implementation Agency of National Inter-Urban Roads of Area IX, Northern Maluku in 2011 indicates that the total length of national roads in Maluku Province is 15,238.01 M, with a total of 562 bridges. In Ambon Island, especially, there are 52 bridges totaling 1,176.25 m in length. The study was conducted at several inter-urban bridges in Maluku Province of Ambon Island: Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari and Wai Tua bridges. Assessment of bridge structure conditions was conducted visually to determine the conditions of the existing bridges comprehensively by referring to the Bridge Management System (BMS complemented with a computer-based Bridge Management Information System (BMIS. Condition scores for the five bridges—Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua, according to Bridge Management System, are 2, 1, 2, 1, and 2 respectively. The scores of the five bridges indicate that their physical condition can be categorized as good or with minor defects. Based on technical screening, the proposed treatment for Wai Batu Merah, Wai Ruhu, Wai Lawa, dan Wai Tua bridges is the rehabilitation of their sub-elements. As for the Wai Yari Bridge, the treatment will be maintained regularly. The defect repair costs are IDR 149,138,238.00, IDR 81,048,000.00, IDR 174,579,106.10, IDR 79,233,324.01 and IDR 238,323,258.60 for Wai Batu, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua Bridges, respectively.

  9. Research on Multidisciplinary Optimization Design of Bridge Crane

    Directory of Open Access Journals (Sweden)

    Tong Yifei

    2013-01-01

    Full Text Available Bridge crane is one of the most widely used cranes in our country, which is indispensable equipment for material conveying in the modern production. In this paper, the framework of multidisciplinary optimization for bridge crane is proposed. The presented research on crane multidisciplinary design technology for energy saving includes three levels, respectively: metal structures level, transmission design level, and electrical system design level. The shape optimal mathematical model of the crane is established for shape optimization design of metal structure level as well as size optimal mathematical model and topology optimal mathematical model of crane for topology optimization design of metal structure level is established. Finally, system-level multidisciplinary energy-saving optimization design of bridge crane is further carried out with energy-saving transmission design results feedback to energy-saving optimization design of metal structure. The optimization results show that structural optimization design can reduce total mass of crane greatly by using the finite element analysis and multidisciplinary optimization technology premised on the design requirements of cranes such as stiffness and strength; thus, energy-saving design can be achieved.

  10. Long-term bridge performance high priority bridge performance issues.

    Science.gov (United States)

    2014-10-01

    Bridge performance is a multifaceted issue involving performance of materials and protective systems, : performance of individual components of the bridge, and performance of the structural system as a whole. The : Long-Term Bridge Performance (LTBP)...

  11. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  12. Bridge health monitoring metrics : updating the bridge deficiency algorithm.

    Science.gov (United States)

    2009-10-01

    As part of its bridge management system, the Alabama Department of Transportation (ALDOT) must decide how best to spend its bridge replacement funds. In making these decisions, ALDOT managers currently use a deficiency algorithm to rank bridges that ...

  13. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  14. Characteristics of a plasma flow field produced by a metal array bridge foil explosion

    Science.gov (United States)

    Junying, WU; Long, WANG; Yase, LI; Lijun, YANG; Manzoor, SULTAN; Lang, CHEN

    2018-07-01

    To improve the energy utilization efficiency of metal bridge foil explosion, and increase the function range of plasmas, array bridge foil explosion experiments with different structures were performed. A Schlieren photographic measurement system with a double-pulse laser source was used to observe the flow field of a bridge foil explosion. The evolution laws of plasmas and shock waves generated by array bridge foil explosions of different structures were analyzed and compared. A multi-phase flow calculation model was established to simulate the electrical exploding process of a metal bridge foil. The plasma equation of state was determined by considering the effect of the changing number of particles and Coulomb interaction on the pressure and internal energy. The ionization degree of the plasma was calculated via the Saha–Eggert equation assuming conditions of local thermal equilibrium. The exploding process of array bridge foils was simulated, and the superposition processes of plasma beams were analyzed. The variation and distribution laws of the density, temperature, pressure, and other important parameters were obtained. The results show that the array bridge foil has a larger plasma jet diameter than the single bridge foil for an equal total area of the bridge foil. We also found that the temperature, pressure, and density of the plasma jet’s center region sharply increase because of the superposition of plasma beams.

  15. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Science.gov (United States)

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  16. Track-Bridge Longitudinal Interaction of Continuous Welded Rails on Arch Bridge

    Directory of Open Access Journals (Sweden)

    Rong Chen

    2013-01-01

    Full Text Available Taking arch bridges, including deck, half-through, and through arch bridges (short for DAB, HTAB, and TAB as examples, mechanics analysis models of longitudinal interaction between continuously welded rails (short for CWRs and arch bridges are established. Based on the finite element method (FEM, the longitudinal interaction calculation software of CWR on arch bridges has been developed. Focusing on an HTAB, the tension, compression, and deflection conditions are calculated and analyzed. The results show that the mechanics analysis models of three types of arch bridges can truly reflect the real state of the structure; the calculation software can be used for systematic research of the CWR on arch bridge; as for HTAB, temperature difference of arch rib has a small effect on rail tension/compression, and arch bridge can be simplified as a continuous beam for rail tension/compression additional force calculation; in calculation of deflection conditions of HTAB, it is suggested that train loads are arranged on half span and full span and take the direction of load entering bridge into account. Additionally, the deflection additional force variation of CFST basket handle arch bridge is different from that of ordinary bridge.

  17. 46 CFR 113.35-7 - Electric engine order telegraph systems; operations.

    Science.gov (United States)

    2010-10-01

    ... transmitter handle automatically connects that transmitter electrically to the engineroom indicator and simultaneously disconnects electrically all other transmitters. The reply pointers of all transmitters must... manually operated transfer switch which will disconnect the system in the unattended navigating bridge must...

  18. Bridges

    NARCIS (Netherlands)

    Zant, W.

    2017-01-01

    We estimate to what extent bridges in Mozambique lead to transport cost reductions and attribute these reductions to key determinants, in particular road distance, road quality and crossing borders. For identification we exploit the introduction of a road bridge over the Zambezi river, in August

  19. Experimental studies of current sharing in parallel driven Graetz bridge units for diurnal superconductive magnetic energy storage

    International Nuclear Information System (INIS)

    Kustom, R.L.; Akita, S.; Okada, H.; Skiles, J.

    1985-01-01

    Superconductive Magnetic Energy Storage (SMES) coils for diurnal load leveling and system peaking are envisioned to operate at hundreds of thousands of amperes and a few kilovolts. The interface between the SMES coil and the electric utility is envisioned to be Graetz bridges using SCR switches. Many parallel SCR switches or bridge units will have to operate in parallel because of the high operating current of the coil. Current balancing on parallel Graetz bridges driving a single 8-hy superconducting coil has been achieved on a laboratory model using delay-angle control with an LSI 11/2 microprocessor and external digital control hardware

  20. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  1. Myocardial Bridging

    Directory of Open Access Journals (Sweden)

    Shi-Min Yuan

    2016-02-01

    Full Text Available Abstract Myocardial bridging is rare. Myocardial bridges are most commonly localized in the middle segment of the left anterior descending coronary artery. The anatomic features of the bridges vary significantly. Alterations of the endothelial morphology and the vasoactive agents impact on the progression of atherosclerosis of myocardial bridging. Patients may present with chest pain, myocardial infarction, arrhythmia and even sudden death. Patients who respond poorly to the medical treatment with β-blockers warrant a surgical intervention. Myotomy is a preferred surgical procedure for the symptomatic patients. Coronary stent deployment has been in limited use due to the unsatisfactory long-term results.

  2. The hepatic bridge.

    Science.gov (United States)

    Sugarbaker, Paul H

    2018-07-01

    The hepatic bridge forms a tunnel of liver parenchyma that may obscure peritoneal metastases associated with the round ligament. Visualization and then resection of nodules associated with this structure is necessary. The incidence of a hepatic bridge and the extent that it covered the round ligament was determined in consecutive patients. Extent of coverage of the round ligament by the hepatic bridge was determined: Class 1 indicates up to one-third of the round ligament obscured, Class 2 up to two-thirds and Class 3 more than two-thirds. In 102 patients in whom the round ligament of the liver could be completely visualized, 50 had a hepatic bridge. Class 1 was 22 (44%) of the bridges, Class 2 was 16 (32%) and Class 3 was 12 (24%). A hepatic bridge was more frequently present in 28 of 45 male patients (62%) vs. 22 of 57 female patients (38%). Approximately one-half of our patients having cytoreductive surgery for peritoneal metastases were observed to have a hepatic bridge. Up to 56% of these patients have Class 2 or 3 hepatic bridge and may require division of the hepatic bridge to completely visualize the contents of the tunnel created by this structure. Copyright © 2018 Elsevier Ltd, BASO ~ The Association for Cancer Surgery, and the European Society of Surgical Oncology. All rights reserved.

  3. Bridge resource program.

    Science.gov (United States)

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...

  4. Aqueous Electrolyte Surfaces in Strong Electric Fields: Molecular Insight into Nanoscale Jets and Bridges.

    Czech Academy of Sciences Publication Activity Database

    Jirsák, J.; Moučka, F.; Škvor, J.; Nezbeda, Ivo

    2015-01-01

    Roč. 113, č. 8 (2015), s. 848-853 ISSN 0026-8976 Institutional support: RVO:67985858 Keywords : molecular dynamics * floating water bridge * electrospinning Subject RIV: CF - Physical ; Theoretical Chemistry Impact factor: 1.837, year: 2015

  5. Bridged graphite oxide materials

    Science.gov (United States)

    Herrera-Alonso, Margarita (Inventor); McAllister, Michael J. (Inventor); Aksay, Ilhan A. (Inventor); Prud'homme, Robert K. (Inventor)

    2010-01-01

    Bridged graphite oxide material comprising graphite sheets bridged by at least one diamine bridging group. The bridged graphite oxide material may be incorporated in polymer composites or used in adsorption media.

  6. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    Science.gov (United States)

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  7. Experimental Validation of a Numerical Model for Three-Dimensional High-Speed Railway Bridge Analysis by Comparison with a Small-Scale Model

    DEFF Research Database (Denmark)

    Sneideris, J.; Bucinskas, Paulius; Agapii, L.

    2015-01-01

    The aim of this paper is to perform dynamic analysis of a multi-span railway bridge interacting with the underlying soil. A small-scale model of a bridge structure is constructed for experimental testing and the results are compared with a computational model. The computational model in this paper...... dimensional 10-degrees-of-freedom system. The subsoil model utilizes Green’s function for a horizontally layered half-space. The small-scale experimental model consists of bridge deck, columns and footings which are made from Plexiglas. An electric vehicle travels along the bridge deck on a track to simulate...

  8. Guardrails for Use on Historic Bridges: Volume 2—Bridge Deck Overhang Design

    OpenAIRE

    Frosch, Robert J.; Morel, Adam J.

    2016-01-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridges can be subject to protection because of the role they play in aesthetics. Unfortunately, original railings on historic bridges do not typically meet current crash-test requirements and typically do not meet current standards for railing height and...

  9. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction

    Science.gov (United States)

    2017-09-01

    Concrete bridge decks are directly exposed to daily traffic loads and may experience some surface cracking caused by excessive stress or fatigue accumulation, which requires repair or replacement. Among typical bridges in North America, bridge decks ...

  10. Design and operation of a transistorised bridge-type detector for burn-out in boiling heat transfer experiments

    Energy Technology Data Exchange (ETDEWEB)

    Salt, K J; Wintle, C A [Reactor Development Division, Atomic Energy Establishment, Winfrith, Dorchester, Dorset (United Kingdom)

    1964-04-15

    Theoretical, technical and operational details of an instrument to protect heater rods in heat transfer burn-out experiments from actual rupture under electrical heating, by a Wheatstone bridge method. (author)

  11. Design and operation of a transistorised bridge-type detector for burn-out in boiling heat transfer experiments

    International Nuclear Information System (INIS)

    Salt, K.J.; Wintle, C.A.

    1964-04-01

    Theoretical, technical and operational details of an instrument to protect heater rods in heat transfer burn-out experiments from actual rupture under electrical heating, by a Wheatstone bridge method. (author)

  12. Cable Supported Bridges

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    Cable supported bridges in the form of suspension bridges and cable-stayed bridges are distinguished by their ability to overcome large spans.The book concentrates on the synthesis of cable supported bridges, covering both design and construction aspects. The analytical part covers simple methods...... to quantify the different structural configurations and allows a preliminary optimization of the main structure.Included are the most recent advances in structural design, corrosion protection of cables, aerodynamic safety, and erection procedures....

  13. Gas supply triggers development at Connaught Bridge

    Energy Technology Data Exchange (ETDEWEB)

    Jeffs, E.

    Malaysia aims to become a fully developed country by the year 2020, which means a steady 20% annual rate of growth of electricity demand to the end of the century. Much of this growth is centered in the area around Kuala Lumpur so that Tenaga Nasional Bhd (Tenaga) urgently needs to bring new generating capacity into the capital area. Access to gas on the west coast of the malay peninsula has given Tenaga Nasional Berhad the opportunity to convert their Connaught Bridge power station to a combined cycle and to install four open-cycle gas turbines. The expansion of Connaught Bridge is the first of several projects which are being developed. In early 1991, as site preparation was getting under way for the combined cycle, Tenaga ordered eight gas turbines for peak load duty from NEI-ABB Gas Turbines. Four of these are the 150 MW Type GT13E with water injection for NOx control which have been installed in parallel with the construction of the steam cycle on the Connaught Bridge site. At sea level and 32[degrees]C site ambient, these gas turbines are rated 130MW on gas for a total 520MW of peak load capacity. The last of these was synchronized on 12 October last year. There are no plans to convert these to combined cycles.

  14. Bridge Programs in Illinois: Results of the 2010 Illinois Bridge Status Survey

    Science.gov (United States)

    Taylor, J. L.; Harmon, T.

    2010-01-01

    This report provides a summary of major results of the Illinois Bridge Status Survey, administered online between April and June 2010. The purpose of the survey was to understand the extent to which bridge programs are being implemented in Illinois, as well as to build an online directory of bridge programs. Bridge programs are an emerging…

  15. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Science.gov (United States)

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  16. Drill pipe bridge plug

    International Nuclear Information System (INIS)

    Winslow, D.W.; Brisco, D.P.

    1991-01-01

    This patent describes a method of stopping flow of fluid up through a pipe bore of a pipe string in a well. It comprises: lowering a bridge plug apparatus on a work string into the pipe string to a position where the pipe bore is to be closed; communicating the pipe bore below a packer of the bridge plug apparatus through the bridge plug apparatus with a low pressure zone above the packer to permit the fluid to flow up through the bridge plug apparatus; engaging the bridge plug apparatus with an internal upset of the pipe string; while the fluid is flowing up through the bridge plug apparatus, pulling upward on the work string and the bridge plug apparatus and thereby sealing the packer against the pipe bore; isolating the pipe bore below the packer from the low pressure zone above the packer and thereby stopping flow of the fluid up through the pipe bore; disconnecting the work string from the bridge plug apparatus; and maintaining the bridge plug apparatus in engagement with the internal upset and sealed against the pipe bore due to an upward pressure differential applied to the bridge plug apparatus by the fluid contained therebelow

  17. A floating water bridge produces water with excess charge

    Science.gov (United States)

    Fuchs, Elmar C.; Sammer, Martina; Wexler, Adam D.; Kuntke, Philipp; Woisetschläger, Jakob

    2016-03-01

    Excess positive and negative Bjerrum-defect like charge (protonic and ‘aterprotonic’, from ancient Greek ἄ'τɛρ, ‘without’) in anolyte and catholyte of high voltage electrolysis of highly pure water was found during the so-called ‘floating water bridge’ experiment. The floating water bridge is a special case of an electrohydrodynamic liquid bridge and constitutes an intriguing phenomenon that occurs when a high potential difference (~kV cm-1) is applied between two beakers of water. To obtain such results impedance spectroscopy was used. This measurement technique allows the depiction and simulation of complex aqueous systems as simple electric circuits. In the present work we show that there is an additional small contribution from the difference in conductivity between anolyte and catholyte which cannot be measured with a conductivity meter, but is clearly visible in an impedance spectrum.

  18. Bridging Anticoagulation

    Science.gov (United States)

    ... clinical centers in the United States, Canada, and Brazil. A more detailed description of the study is ... Your Personal Message Send Message Share on Social Media Bridging Anticoagulation The BRIDGE Study Investigators Circulation. 2012; ...

  19. Bridging the Gap

    DEFF Research Database (Denmark)

    Kramer Overgaard, Majken; Broeng, Jes; Jensen, Monika Luniewska

    Bridging the Gap (BtG) is a 2-year project funded by The Danish Industry Foundation. The goal of Bridging the Gap has been to create a new innovation model which will increase the rate at which Danish universities can spinout new technology ventures.......Bridging the Gap (BtG) is a 2-year project funded by The Danish Industry Foundation. The goal of Bridging the Gap has been to create a new innovation model which will increase the rate at which Danish universities can spinout new technology ventures....

  20. Long Span Bridges in Scandinavia

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1998-01-01

    The first Scandinavian bridge with a span of more than 500 m was the Lillebælt Suspension Bridge opened to traffic in 1970.Art the end of the 20th century the longest span of any European bridge is found in the Storebælt East Bridge with a main span of 1624 m. Also the third longest span in Europe...... is found in Scandinavia - the 1210 m span of the Höga Kusten Bridge in Sweden.The Kvarnsund Bridge in Norway was at the completion in 1991 the longest cable-stayed bridge in the world, and the span of 530 m is still thge longest for cable-stayed bridges in concrete. The Øresund Bridge with its sapn of 490...

  1. Half bridge resonant converter for ignition of thermal plasmas; Convertidor resonante de medio puente para la ignicion de plasmas termicos

    Energy Technology Data Exchange (ETDEWEB)

    Pena E, L

    1998-12-31

    In this work the background, design, implementation and performance of a half bridge resonant converter (HBRC) used as an electronic ignition system for arc plasma torch generation is presented. The significance of the design lies in its simplicity, versatility and low cost. The system operates like a high voltage supply attached to electrodes before gaseous breakdown and like open circuit when electric arc is established. Resonant converter is implemented with a high voltage and high speed power driver intended for control the power MOSFET transistors connected in half bridge topology with L C load. The HBRC operates besides interference into domestic electric supply line (120 V, 60 Hz) as well electric measurement devices. Advantages and limitations of the converter are reviewed. Experimental impedance variation in the medium as a function of frequency operation and some experiences in striking arcs are also presented. (Author).

  2. An Empirical Model for Estimating the Probability of Electrical Short Circuits from Tin Whiskers-Part I

    Science.gov (United States)

    Courey, Karim; Wright, Clara; Asfour, Shihab; Bayliss, Jon; Ludwig, Larry

    2008-01-01

    Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that has a currently unknown probability associated with it. Due to contact resistance, electrical shorts may not occur at lower voltage levels. In this experiment, we study the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From this data, we can estimate the probability of an electrical short, as a function of voltage, given that a free tin whisker has bridged two adjacent exposed electrical conductors. In addition, three tin whiskers grown from the same Space Shuttle Orbiter card guide used in the aforementioned experiment were cross sectioned and studied using a focused ion beam (FIB).

  3. Integral Abutment and Jointless Bridges

    Directory of Open Access Journals (Sweden)

    Cristian-Claudiu Comisu

    2005-01-01

    Full Text Available Integral bridges, or integral abutment and jointless bridges, as they are more commonly known in the USA, are constructed without any movement joints between spans or between spans and abutments. Typically these bridges have stub-type abutments supported on piles and continuous bridge deck from one embankment to the other. Foundations are usually designed to be small and flexible to facilitate horizontal movement or rocking of the support. Integrally bridges are simple or multiple span ones that have their superstructure cast integrally with their substructure. The jointless bridges cost less to construct and require less maintenance then equivalent bridges with expansion joints. Integral bridges present a challenge for load distribution calculations because the bridge deck, piers, abutments, embankments and soil must all be considered as single compliant system. This paper presents some of the important features of integral abutment and jointless bridge design and some guidelines to achieve improved design. The goal of this paper is to enhance the awareness among the engineering community to use integral abutment and jointless bridges in Romania.

  4. Bridge deterioration models to support Indiana's bridge management system.

    Science.gov (United States)

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  5. Automatic Bridge Control System

    OpenAIRE

    M. Niraimathi; S.Sivakumar; R.Vigneshwaran; R.Vinothkumar; P.Babu

    2012-01-01

    Bridge vibration control is an important issue whose purpose is to extend the structural service life of bridges. Normally, the bridge is modeled as an elastic beam or plate subject to a moving vehicle. However, the moving truck on a bridge is a complicated problem that must still be researched. In this paper, wepropose a new method, to overcome the huge load in the bridge a load cell is used at the entry which will monitor the load continuously at both ends. To escape from the heavy water fl...

  6. An Investigation of the Electrical Short Circuit Characteristics of Tin Whiskers

    Science.gov (United States)

    Courey, Karim J.

    2008-01-01

    Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that has a currently unknown probability associated with it. Due to contact resistance electrical shorts may not occur at lower voltage levels. In this experiment, we study the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From this data we can estimate the probability of an electrical short, as a function of voltage, given that a free tin whisker has bridged two adjacent exposed electrical conductors. Also, three tin whiskers grown from the same Space Shuttle Orbiter card guide used in the aforementioned experiment were cross-sectioned and studied using a focused ion beam (FIB). The rare polycrystalline structure seen in the FIB cross section was confirmed using transmission electron microscopy (TEM). The FIB was also used to cross section two card guides to facilitate the measurement of the grain size to determine that the tin plating on the card guides had a bright finish.

  7. A floating water bridge produces water with excess charge

    International Nuclear Information System (INIS)

    Fuchs, Elmar C; Sammer, Martina; Wexler, Adam D; Kuntke, Philipp; Woisetschläger, Jakob

    2016-01-01

    Excess positive and negative Bjerrum-defect like charge (protonic and ‘aterprotonic’, from ancient Greek ατερ, ‘without’) in anolyte and catholyte of high voltage electrolysis of highly pure water was found during the so-called ‘floating water bridge’ experiment. The floating water bridge is a special case of an electrohydrodynamic liquid bridge and constitutes an intriguing phenomenon that occurs when a high potential difference (∼kV cm −1 ) is applied between two beakers of water. To obtain such results impedance spectroscopy was used. This measurement technique allows the depiction and simulation of complex aqueous systems as simple electric circuits. In the present work we show that there is an additional small contribution from the difference in conductivity between anolyte and catholyte which cannot be measured with a conductivity meter, but is clearly visible in an impedance spectrum. (paper)

  8. Existing Steel Railway Bridges Evaluation

    Science.gov (United States)

    Vičan, Josef; Gocál, Jozef; Odrobiňák, Jaroslav; Koteš, Peter

    2016-12-01

    The article describes general principles and basis of evaluation of existing railway bridges based on the concept of load-carrying capacity determination. Compared to the design of a new bridge, the modified reliability level for existing bridges evaluation should be considered due to implementation of the additional data related to bridge condition and behaviour obtained from regular inspections. Based on those data respecting the bridge remaining lifetime, a modification of partial safety factors for actions and materials could be respected in the bridge evaluation process. A great attention is also paid to the specific problems of determination of load-caring capacity of steel railway bridges in service. Recommendation for global analysis and methodology for existing steel bridge superstructure load-carrying capacity determination are described too.

  9. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Science.gov (United States)

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  10. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Science.gov (United States)

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  11. Hydraulic modeling of flow impact on bridge structures: a case study on Citarum bridge

    Science.gov (United States)

    Siregar, R. I.

    2018-02-01

    Flood waves because of the rapid catchment response to high intense rainfall, breaches of flood defenses may induce huge impact forces on structures, causing structural damage or even failures. Overflowing stream that passes over the bridge, it means to discharge flood water level is smaller than the capacity of the river flow. In this study, the researches present the methodological approach of flood modeling on bridge structures. The amount of force that obtained because of the hydrostatic pressure received by the bridge at the time of the flood caused the bridge structure disrupted. This paper presents simulation of flow impact on bridge structures with some event flood conditions. Estimating the hydrostatic pressure developed new model components, to quantify the flow impact on structures. Flow parameters applied the model for analyzing, such as discharge, velocity, and water level or head that effect of bridge structures. The simulation will illustrate the capability of bridge structures with some event flood river and observe the behavior of the flow that occurred during the flood. Hydraulic flood modeling use HEC-RAS for simulation. This modeling will describe the impact on bridge structures. Based on the above modelling resulted, in 2008 has flood effect more than other years on the Citarum Bridge, because its flow overflow on the bridge.

  12. Existing Steel Railway Bridges Evaluation

    Directory of Open Access Journals (Sweden)

    Vičan Josef

    2016-12-01

    Full Text Available The article describes general principles and basis of evaluation of existing railway bridges based on the concept of load-carrying capacity determination. Compared to the design of a new bridge, the modified reliability level for existing bridges evaluation should be considered due to implementation of the additional data related to bridge condition and behaviour obtained from regular inspections. Based on those data respecting the bridge remaining lifetime, a modification of partial safety factors for actions and materials could be respected in the bridge evaluation process. A great attention is also paid to the specific problems of determination of load-caring capacity of steel railway bridges in service. Recommendation for global analysis and methodology for existing steel bridge superstructure load-carrying capacity determination are described too.

  13. Light-weight aluminium bridges and bridge decks. An overview of recent applications

    NARCIS (Netherlands)

    Maljaars, J.; Soetens, F.; Kluyver, D. de

    2008-01-01

    The last decades have shown a large increase in the application of aluminium alloys for light-weight bridges. For bridge construction, aluminium alloys have some specific advantages, but also some points of attention. This paper deals with some recent projects of aluminium bridges, and for these

  14. Experimental design for the evaluation of high-T(sub c) superconductive thermal bridges in a sensor satellite

    Science.gov (United States)

    Scott, Elaine P.; Lee, Kasey M.

    1994-01-01

    Infrared sensor satellites, which consist of cryogenic infrared sensor detectors, electrical instrumentation, and data acquisition systems, are used to monitor the conditions of the earth's upper atmosphere in order to evaluate its present and future changes. Currently, the electrical connections (instrumentation), which act as thermal bridges between the cryogenic infrared sensor and the significantly warmer data acquisition unit of the sensor satellite system, constitute a significant portion of the heat load on the cryogen. As a part of extending the mission life of the sensor satellite system, the researchers at the National Aeronautics and Space Administration's Langley Research Center (NASA-LaRC) are evaluating the effectiveness of replacing the currently used manganin wires with high-temperature superconductive (HTS) materials as the electrical connections (thermal bridges). In conjunction with the study being conducted at NASA-LaRC, the proposed research is to design a space experiment to determine the thermal savings on a cryogenic subsystem when manganin leads are replaced by HTS leads printed onto a substrate with a low thermal conductivity, and to determine the thermal conductivities of HTS materials. The experiment is designed to compare manganin wires with two different types of superconductors on substrates by determining the heat loss by the thermal bridges and providing temperature measurements for the estimation of thermal conductivity. A conductive mathematical model has been developed and used as a key tool in the design process and subsequent analysis.

  15. Development of bridge girder movement criteria for accelerated bridge construction.

    Science.gov (United States)

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  16. Active Control of Suspension Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper some recent research on active control of very long suspension bridges, is presented. The presentation is based on research work at Aalborg University, Denmark. The active control system is based on movable flaps attached to the bridge girder. Wind load on bridges with or without...... flaps attached to the girder is briefly presented. A simple active control system is discussed. Results from wind tunnel experiments with a bridge section show that flaps can be used effectively to control bridge girder vibrations. Flutter conditions for suspension bridges with and without flaps...

  17. Morphological aspects of myocardial bridges.

    Science.gov (United States)

    Lujinović, Almira; Kulenović, Amela; Kapur, Eldan; Gojak, Refet

    2013-11-01

    Although some myocardial bridges can be asymptomatic, their presence often causes coronary disease either through direct compression of the "tunnel" segment or through stimulation and accelerated development of atherosclerosis in the segment proximally to the myocardial bridge. The studied material contained 30 human hearts received from the Department of Anatomy. The hearts were preserved 3 to 5 days in 10% formalin solution. Thereafter, the fatty tissue was removed and arterial blood vessels prepared by careful dissection with special reference to the presence of the myocardial bridges. Length and thickness of the bridges were measured by the precise electronic caliper. The angle between the myocardial bridge fibre axis and other axis of the crossed blood vessel was measured by a goniometer. The presence of the bridges was confirmed in 53.33% of the researched material, most frequently (43.33%) above the anterior interventricular branch. The mean length of the bridges was 14.64 ± 9.03 mm and the mean thickness was 1.23 ± 1.32 mm. Myocardial bridge fibres pass over the descending blood vessel at the angle of 10-90 degrees. The results obtained on a limited sample suggest that the muscular index of myocardial bridge is the highest for bridges located on RIA, but that the difference is not significant in relation to bridges located on other branches. The results obtained suggest that bridges located on other branches, not only those on RIA, could have a great contractive power and, consequently, a great compressive force, which would be exerted on the wall of a crossed blood vessel.

  18. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Science.gov (United States)

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  19. Remarks on crack-bridging concepts

    International Nuclear Information System (INIS)

    Bao, G.; Suo, Z.

    1992-01-01

    The article draws upon recent work by us and our colleagues on metal and ceramic matrix composites for high temperature engines. The central theme here is to deduce mechanical properties, such as toughness, strength and notch-ductility, from bridging laws that characterize inelastic processes associated with fracture. A particular set of normalization is introduced to present the design charts, segregating the roles played by the shape, and the scale, of a bridging law. A single material length, γ 0 E/σ 0 , emerges, where γ 0 is the limiting-separation, σ 0 the bridging-strength, and E the Young's modulus of the solid. It is the huge variation of this length-from a few manometers for atomic bond, to a meter for cross-over fibers - that underlies the richness in material behaviors. Under small-scale bridging conditions, γ 0 E/σ 0 is the only basic length scale in the mechanics problem and represents, with a pre-factor about 0.4, the bridging zone size. A catalog of small-scale bridging solutions is compiled for idealized bridging laws. Large-scale bridging introduces a dimensionless group, a/(γ 0 E/σ 0 ), where a is a length characterizing the component. The group plays a major role in all phenomena associated with bridging, and provides a focus of discussion in this article. For example, it quantifies the bridging scale when a is the unbridged crack length, and notch-sensitivity when a is hole radius. The difference and the connection between Irwin's fracture mechanics and crack bridging concepts are discussed. It is demonstrated that fracture toughness and resistance curve are meaningful only when small-scale bridging conditions prevail, and therefore of limited use in design with composites. Many other mechanical properties of composites, such as strength and notch-sensitivity, can be simulated by invoking large-scale bridging concepts. 37 refs., 21 figs., 3 tabs

  20. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  1. Cooperativity of complex salt bridges

    OpenAIRE

    Gvritishvili, Anzor G.; Gribenko, Alexey V.; Makhatadze, George I.

    2008-01-01

    The energetic contribution of complex salt bridges, in which one charged residue (anchor residue) forms salt bridges with two or more residues simultaneously, has been suggested to have importance for protein stability. Detailed analysis of the net energetics of complex salt bridge formation using double- and triple-mutant cycle analysis revealed conflicting results. In two cases, it was shown that complex salt bridge formation is cooperative, i.e., the net strength of the complex salt bridge...

  2. Comprehensive evaluation of fracture critical bridges.

    Science.gov (United States)

    2014-02-01

    Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In a fracture critical bridge a failure of a tension member leads to collapse of the bridge. However, ...

  3. Timber in Bridge Structures

    OpenAIRE

    Detkin, Viktoria

    2016-01-01

    The purpose of this final year project was to study the properties of timber as a structural material and the suitability of wood in load bearing members for bridge structures. For a case study, an existing timber bridge was selected. Due to its condition the bridge should be replaced. The design of a new bridge with steel beams holding a glulam deck was made. During the case study the replacement of steel beams by glulam timber ones was discussed. Some calculations were made in order to ...

  4. An energy-harvesting power supply for underwater bridge scour monitoring sensors

    Science.gov (United States)

    Wang, Yuli; Li, Yingjie; He, Longzhuang; Shamsi, Pourya; Zheng, Yahong R.

    2018-03-01

    The natural force of scouring has become one of the most critical risk endangering the endurance of bridges, thus leading to the necessity of deploying underwater monitoring sensors to actively detect potential scour holes under bridges. Due to the difficulty in re-charging batteries for underwater sensors, super capacitors with energy harvesting (EH) means are exploited to prolong the sustainability of underwater sensors. In this paper, an energy harvesting power supply based on a helical turbine is proposed to power underwater monitoring sensors. A small helical turbine is designed to convert water flow energy to electrical energy with favorable environmental robustness. A 3-inch diameter, 2.5-inch length and 3-bladed helical turbine was designed with two types of waterproof coupling with the sensor housing. Both designs were prototyped and tested under different flow conditions and we get valid voltage around 0.91 V which is enough to power monitoring sensor. The alternating current (AC) electrical energy generated by the helical turbine is then rectified and boosted to drive a DC charger for efficiently charging one super capacitor. The charging circuit was designed, prototyped and tested thoroughly with the helical turbine harvester. The results were promising, that the overall power supply can power an underwater sensor node with wireless transceivers for long-term operations

  5. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Science.gov (United States)

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  6. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Science.gov (United States)

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  7. Simulation of multivariate diffusion bridges

    DEFF Research Database (Denmark)

    Bladt, Mogens; Finch, Samuel; Sørensen, Michael

    We propose simple methods for multivariate diffusion bridge simulation, which plays a fundamental role in simulation-based likelihood and Bayesian inference for stochastic differential equations. By a novel application of classical coupling methods, the new approach generalizes a previously...... proposed simulation method for one-dimensional bridges to the mulit-variate setting. First a method of simulating approzimate, but often very accurate, diffusion bridges is proposed. These approximate bridges are used as proposal for easily implementable MCMC algorithms that produce exact diffusion bridges...

  8. Bony ankylosis following thermal and electrical injury

    Energy Technology Data Exchange (ETDEWEB)

    Balen, P.F.; Helms, C.A. [Dept. of Radiology, Duke University Medical Center, Durham, NC (United States)

    2001-07-01

    Objective. Bony ankylosis has been described following trauma, paralysis, psoriasis, Reiter's syndrome, ankylosing spondylitis, juvenile chronic arthritis and rheumatoid arthritis. Reports of bony ankylosis following thermal and electrical injury are limited.Design and patients. Thirteen cases of burn-related joint ankylosis in four patients are presented.Conclusion. Patients with burns from thermal or electrical injury may develop bony ankylosis among other radiographic manifestations. This bony ankylosis may result either from bridging extra-articular heterotopic ossification with preservation of the underlying joint or from intra-articular fusion due to joint destruction. (orig.)

  9. Steel-soil composite bridge

    DEFF Research Database (Denmark)

    Du, Guangli; Pettersson, Lars; Karoumi, Raid

    2017-01-01

    viability, while their environmental performance is overlooked. Today’s designers are urged to seek new design options to reduce the environmental burdens. Sweden owns more than 24574 bridges and most of them are short spans. Among them, the slab frame bridge (CFB) is a common solution. Soil steel composite...... bridge (SSCB), alternatively, is a functionally equivalent solution to CFB and shows advantages in low cost and easy construction. This paper compares the environmental performance between these two bridge types based on life cycle assessment (LCA). The analysis and result shows that, the SSCB...

  10. The potential of natural gas as a bridging technology in low-emission road transportation in Germany

    Directory of Open Access Journals (Sweden)

    Wang-Helmreich Hanna

    2012-01-01

    Full Text Available Greenhouse gas emission reductions are at the centre of national and international efforts to mitigate climate change. In road transportation, many politically incentivised measures focus on increasing the energy efficiency of established technologies, or promoting electric or hybrid vehicles. The abatement potential of the former approach is limited, electric mobility technologies are not yet market-ready. In a case study for Germany, this paper focuses on natural gas powered vehicles as a bridging technology in road transportation. Scenario analyses with a low level of aggregation show that natural gas-based road transportation in Germany can accumulate up to 464 million tonnes of CO2-equivalent emission reductions until 2030 depending on the speed of the diffusion process. If similar policies were adopted EU-wide, the emission reduction potential could reach a maximum of about 2.5 billion tonnes of CO2-equivalent. Efforts to promote natural gas as a bridging technology may therefore contribute to significant emissions reductions.

  11. Chaos in electric drive systems analysis control and application

    CERN Document Server

    Chau, K T

    2011-01-01

    In Chaos in Electric Drive Systems: Analysis, Control and Application authors Chau and Wang systematically introduce an emerging technology of electrical engineering that bridges abstract chaos theory and practical electric drives. The authors consolidate all important information in this interdisciplinary technology, including the fundamental concepts, mathematical modeling, theoretical analysis, computer simulation, and hardware implementation. The book provides comprehensive coverage of chaos in electric drive systems with three main parts: analysis, control and application. Corresponding drive systems range from the simplest to the latest types: DC, induction, synchronous reluctance, switched reluctance, and permanent magnet brushless drives.The first book to comprehensively treat chaos in electric drive systemsReviews chaos in various electrical engineering technologies and drive systemsPresents innovative approaches to stabilize and stimulate chaos in typical drivesDiscusses practical application of cha...

  12. National Bridge Inventory (NBI) Bridges

    Data.gov (United States)

    Department of Homeland Security — The NBI is a collection of information (database) describing the more than 600,000 of the Nation's bridges located on public roads, including Interstate Highways,...

  13. Wright-Fisher diffusion bridges.

    Science.gov (United States)

    Griffiths, Robert C; Jenkins, Paul A; Spanò, Dario

    2017-10-06

    The trajectory of the frequency of an allele which begins at x at time 0 and is known to have frequency z at time T can be modelled by the bridge process of the Wright-Fisher diffusion. Bridges when x=z=0 are particularly interesting because they model the trajectory of the frequency of an allele which appears at a time, then is lost by random drift or mutation after a time T. The coalescent genealogy back in time of a population in a neutral Wright-Fisher diffusion process is well understood. In this paper we obtain a new interpretation of the coalescent genealogy of the population in a bridge from a time t∈(0,T). In a bridge with allele frequencies of 0 at times 0 and T the coalescence structure is that the population coalesces in two directions from t to 0 and t to T such that there is just one lineage of the allele under consideration at times 0 and T. The genealogy in Wright-Fisher diffusion bridges with selection is more complex than in the neutral model, but still with the property of the population branching and coalescing in two directions from time t∈(0,T). The density of the frequency of an allele at time t is expressed in a way that shows coalescence in the two directions. A new algorithm for exact simulation of a neutral Wright-Fisher bridge is derived. This follows from knowing the density of the frequency in a bridge and exact simulation from the Wright-Fisher diffusion. The genealogy of the neutral Wright-Fisher bridge is also modelled by branching Pólya urns, extending a representation in a Wright-Fisher diffusion. This is a new very interesting representation that relates Wright-Fisher bridges to classical urn models in a Bayesian setting. Copyright © 2017 Elsevier Inc. All rights reserved.

  14. Three-phase electric drive with modified electronic smoothing inductor

    DEFF Research Database (Denmark)

    Singh, Yash Veer; Rasmussen, Peter Omand; Andersen, Torben Ole

    2010-01-01

    This paper presents a three-phase electric drive with a modified electronic smoothing inductor (MESI) having reduced size of passive components. The classical electronic smoothing inductor (ESI) is able to control a diode bridge output current and also reduce not only mains current harmonics...

  15. National Bridge Inventory System (NBI)

    Data.gov (United States)

    Department of Transportation — The NBI System is the collection of bridge inspection information and costs associated with bridge replacements of structurally deficient bridges on and off the NHS....

  16. Extracorporeal Life Support Bridge to Ventricular Assist Device: The Double Bridge Strategy.

    Science.gov (United States)

    Marasco, Silvana F; Lo, Casey; Murphy, Deirdre; Summerhayes, Robyn; Quayle, Margaret; Zimmet, Adam; Bailey, Michael

    2016-01-01

    In patients requiring left ventricular assist device (LVAD) support, it can be difficult to ascertain suitability for long-term mechanical support with LVAD and eventual transplantation. LVAD implantation in a shocked patient is associated with increased morbidity and mortality. Interest is growing in the utilization of extracorporeal life support (ECLS) as a bridge-to-bridge support for these critically unwell patients. Here, we reviewed our experience with ECLS double bridging. We hypothesized that ECLS double bridging would stabilize end-organ dysfunction and reduce ventricular assist device (VAD) implant perioperative mortality. We conducted a retrospective review of prospectively collected data for 58 consecutive patients implanted with a continuous-flow LVAD between January 2010 and December 2013 at The Alfred Hospital, Melbourne, Victoria, Australia. Twenty-three patients required ECLS support pre-LVAD while 35 patients underwent LVAD implantation without an ECLS bridge. Preoperative morbidity in the ECLS bridge group was reflected by increased postoperative intensive care duration, blood loss, blood product use, and postoperative renal failure, but without negative impact upon survival when compared with the no ECLS group. ECLS stabilization improved end-organ function pre-VAD implant with significant improvements in hepatic and renal dysfunction. This series demonstrates that the use of ECLS bridge to VAD stabilizes end-organ dysfunction and reduces VAD implant perioperative mortality from that traditionally reported in these "crash and burn" patients. Copyright © 2015 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  17. Synthesis and characterization of self-bridged silver vanadium oxide/CNTs composite and its enhanced lithium storage performance.

    Science.gov (United States)

    Liang, Liying; Liu, Haimei; Yang, Wensheng

    2013-02-07

    The improvement of the electrochemical properties of electrode materials with large capacity and good capacity retention is becoming an important task in the field of lithium ion batteries (LIBs). We designed a function-oriented hybrid material consisting of silver vanadium oxide (β-AgVO(3)) nanowires modified with uniform Ag nanoparticles and multi-walled carbon nanotubes (CNTs) as a high-performance cathode material for LIBs. The Ag nanoparticles which precipitated automatically in the synthetic process act as a bridge between the β-AgVO(3) nanowires and CNTs, creating a self-bridged network structure. The Ag particles at the junction of the nanowires and CNTs facilitate electron transport from the CNTs to the nanowires, and thereby improve the electrical conductivity of the β-AgVO(3) nanowires and the composite. Moreover, the self-bridged network is hierarchically porous with a high surface area. When used as a cathode material, this composite electrode reveals high discharge capacities, excellent rate capability, and good cycling stability. The improved performance of the composite arises from its unique nanosized β-AgVO(3) nanowires with short diffusion pathway for lithium ions, efficient electron collection and transfer in the presence of Ag nanoparticles, together with excellent electrical conductivity of CNTs.

  18. Cascaded resonant bridge converters

    Science.gov (United States)

    Stuart, Thomas A. (Inventor)

    1989-01-01

    A converter for converting a low voltage direct current power source to a higher voltage, high frequency alternating current output for use in an electrical system where it is desired to use low weight cables and other circuit elements. The converter has a first stage series resonant (Schwarz) converter which converts the direct current power source to an alternating current by means of switching elements that are operated by a variable frequency voltage regulator, a transformer to step up the voltage of the alternating current, and a rectifier bridge to convert the alternating current to a direct current first stage output. The converter further has a second stage series resonant (Schwarz) converter which is connected in series to the first stage converter to receive its direct current output and convert it to a second stage high frequency alternating current output by means of switching elements that are operated by a fixed frequency oscillator. The voltage of the second stage output is controlled at a relatively constant value by controlling the first stage output voltage, which is accomplished by controlling the frequency of the first stage variable frequency voltage controller in response to second stage voltage. Fault tolerance in the event of a load short circuit is provided by making the operation of the first stage variable frequency voltage controller responsive to first and second stage current limiting devices. The second stage output is connected to a rectifier bridge whose output is connected to the input of the second stage to provide good regulation of output voltage wave form at low system loads.

  19. Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges

    Science.gov (United States)

    Moran Yanez, Luis M.

    The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.

  20. Strength monitoring of bridge constructions and features of its application. Part 2. Continuous monitoring of bridge construction status

    Directory of Open Access Journals (Sweden)

    Ovchinnikov Igor Georgievich

    2014-06-01

    Full Text Available The article describes a system of continuous monitoring of bridge constructions — a system of observation over the operating conditions and behavior of the bridge structure, which is aimed at ensuring the preservation of its functional application properties within the specified limits, realized on the continuous, long-term basis with the use of instrumentation and ensures on-line presentation of information on the status of structure. To illustrate, one may consider the existing systems of continuous monitoring for a number of bridge constructions in the United States, Japan, Europe, South Korea, Greece and Russia. The article suggests to examine the systems of continuous monitoring of «Commodore John Barry» truss bridge, «Akashi-Kaikyo» suspension bridge, «Siggenthal» reinforced-concrete arch bridge, «Nimhe» suspension bridge, «Jindo»cable-stayed bridge, «Yandzhon» suspension bridge, «Banghwa» bridge, «Seohae» bridge and «Rio-Antirrio» bridge. In addition one may consider monitoring of the longitudinal launching of the bridge superstructures over the Volga River near the village Pristannoye in Saratov region. Finally, it was drawn the conclusion that monitoring of bridge constructions from the standpoint of their consumers is aimed at solving such important problems as preservation of bridge structures, increase in service life of bridge structures through timely detection of faults and their elimination, as well as preservation of bridge structure carrying capacity by controlling their behavior during the operation and improving the efficiency of expenditure of monetary resources for repair activities by correct determination of time and type of the necessary repair.

  1. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Science.gov (United States)

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  2. Modification of genetic effect of gamma irradiation by electric current

    International Nuclear Information System (INIS)

    Grigor'eva, N.N.; Shakhbazov, V.G.

    1985-01-01

    The effect of direct electric current of different value and polarity on genetic sequences of γ-irradiation of Vicia faba seedlings has been studied. The previously found modifying effect of direct electric current is confirmed. The extent and character of this effect depend on the value and polarity of current as well as time between irradiation and electric effects. Current effect modes having no effect on irradiated seedlings protecting cells from injury and the modes aggravating radiation effect have been found. At certain modes the effects of direct electric current on irradiated seedlings changes in the rearrangement spectrum are observed, particularly the number of bridges is increased

  3. Principles of Bridge Reliability

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Nowak, Andrzej S.

    The paper gives a brief introduction to the basic principles of structural reliability theory and its application to bridge engineering. Fundamental concepts like failure probability and reliability index are introduced. Ultimate as well as serviceability limit states for bridges are formulated......, and as an example the reliability profile and a sensitivity analyses for a corroded reinforced concrete bridge is shown....

  4. Design and construction of superstructure in prestressed concrete cable-stayed bridge. ; Aomori Bay Bridge. PC shachokyo jobuko no sekkei to seko. ; Aomori Bay Bridge

    Energy Technology Data Exchange (ETDEWEB)

    Ishibashi, T.; Fujimori, S.; Oba, M.; Tsuyoshi, T. (East Japan Railway Co., Tokyo (Japan))

    1991-12-01

    Aomori Bay Bridge is a 1,219m long elevated bridge, a part of No.2 Bay Highway of 1,993m in total length crossing over Aomori railway station which was planned in ordecr to integrate the port facilities of Aomori Harbor and expedite cargo traffic smoothly. Of this Bay Bridge, its main bridge portion crossing over Aomori railway station and the sea area was planned as a continuous prestressed concrete cable-stayed bridge of 498m in total length and consisting of three portions including the central portion in which the main span between the central bridge piers was 240m. It is scheduled to open in the summer of 1992. With regard to the design of this bridge, special care for the view of the bridge has been taken covering from the structure style to the accessories. For this bridge, a large scale underground continuous wall solid base with a box-shaped section consisting of 6 chambers was adopted for the base of a main tower. It has the cantilever suspension structure of the wide girder with the inverted Y-shaped pylons. For its stav cable, was adopted a large capacity stay cable with standard tensile strength of 1,942 fabricated on the site and for its covering tube, a FRP tube was adopted. In this article, the construction of the main girder and stay cables, and the construction control during their installation by projection are reported. 7 refs., 14 figs., 9 tabs.

  5. Highly conductive bridges between graphite spheres to improve the cycle performance of a graphite anode in lithium-ion batteries

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Hongyu [IM and T Ltd., Advanced Research Center, Saga University, Yoga-machi 1341, Saga 840-0047 (Japan); Umeno, Tatsuo; Mizuma, Koutarou [Research Center, Mitsui Mining Co. Ltd., Hibiki-machi 1-3, Wakamatsu-ku, Kitakyushu 808-0021 (Japan); Yoshio, Masaki [Advanced Research Center, Saga University, Yoga-machi 1341, Saga 840-0047 (Japan)

    2008-01-10

    Spherical carbon-coated natural graphite (SCCNG) is a promising anode material for lithium-ion batteries, but the smooth surface of graphite spheres is difficult to wet with an aqueous binder solution, and lacks electrical contacts. As a result, the cycle performance of such a graphite anode material is not satisfactory. An effective method has been introduced to tightly connect adjacent SCCNG particles by a highly conductive binder, viz. acetylene black bridges. The effect of the conductive bridges on the cyclability of SCCNG electrode has been investigated. (author)

  6. Impact Coefficient Analysis of Long-Span Railway Cable-Stayed Bridge Based on Coupled Vehicle-Bridge Vibration

    Directory of Open Access Journals (Sweden)

    Yongle Li

    2015-01-01

    Full Text Available Compared with medium and small span bridges, very limited attention has been paid on the research of the impact coefficient of long-span railway bridges. To estimate the impact effects of long-span railway bridges subjected to moving vehicles, a real long-span railway cable-stayed bridge is regarded as the research object in this study, and a coupled model of vehicle-bridge system is established. The track irregularities are taken as the system excitation and the dynamic responses of the vehicle-bridge system are calculated. The impact effects on main girder, stayed cable, bearings, and bridge tower are discussed at various vehicle speeds. The results show that different components of the long-span railway cable-stayed bridge have different impact coefficients. Even for each part, the impact coefficient is also different at different local positions. It reveals that the impact coefficients in the actual situation may have significant differences with the related code clauses in the present design codes.

  7. Fabrication and Characterization of MWCNT-Based Bridge Devices

    KAUST Repository

    Chappanda, Karumbaiah N.; Batra, Nitin M; Holguin, Jorge; Da Costa, Pedro M. F. J.; Younis, Mohammad I.

    2017-01-01

    Carbon nanotubes (CNTs) are one of the most actively researched structural materials due to their interesting electrical, mechanical, and chemical properties. Unlike single walled carbon nanotubes (SWCNTs), little work has been focused on multi-walled carbon nanotubes (MWCNTs) and their potential for practical devices. Here, we have fabricated bridge-shape devices integrating MWCNTs (> 50 nm in outer diameter) using three processes: optical lithography, electron beam-induced platinum deposition, and surface micromachining. Each device consists of a doubly-clamped nanotube suspended over gold electrodes on a highly conductive Si substrate. The suspended nanotubes are characterized individually using Raman spectroscopy and semiconductor parameters analysis and, overall, show, high crystallinity and low electrical resistance. The spring constants of doubly-clamped nanotubes were characterized using atomic force microscopy force-displacement measurements, with values as high as 70 N/m observed. Highly stiff MWCNTs are promising for a variety of applications, such as resonators and electrical interconnects. Through simulations, we estimate the resonance frequencies and pull-in voltages of these suspended nano-structures. The dependence of key parameters, such as the nanotube's length, Young's modulus, axial stress, and wall thickness is also discussed.

  8. Fabrication and Characterization of MWCNT-Based Bridge Devices

    KAUST Repository

    Chappanda, Karumbaiah N.

    2017-08-21

    Carbon nanotubes (CNTs) are one of the most actively researched structural materials due to their interesting electrical, mechanical, and chemical properties. Unlike single walled carbon nanotubes (SWCNTs), little work has been focused on multi-walled carbon nanotubes (MWCNTs) and their potential for practical devices. Here, we have fabricated bridge-shape devices integrating MWCNTs (> 50 nm in outer diameter) using three processes: optical lithography, electron beam-induced platinum deposition, and surface micromachining. Each device consists of a doubly-clamped nanotube suspended over gold electrodes on a highly conductive Si substrate. The suspended nanotubes are characterized individually using Raman spectroscopy and semiconductor parameters analysis and, overall, show, high crystallinity and low electrical resistance. The spring constants of doubly-clamped nanotubes were characterized using atomic force microscopy force-displacement measurements, with values as high as 70 N/m observed. Highly stiff MWCNTs are promising for a variety of applications, such as resonators and electrical interconnects. Through simulations, we estimate the resonance frequencies and pull-in voltages of these suspended nano-structures. The dependence of key parameters, such as the nanotube\\'s length, Young\\'s modulus, axial stress, and wall thickness is also discussed.

  9. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  10. Salt-bridge energetics in halophilic proteins.

    Science.gov (United States)

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are -3.0 kcal mol-1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of -5.0 kcal mol-1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (-10 kcal mol-1) exceeds than that of bridge term (-7 kcal mol-1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its

  11. Bridge the Gap

    DEFF Research Database (Denmark)

    Marselis, Randi

    2017-01-01

    This article focuses on photo projects organised for teenage refugees by the Society for Humanistic Photography (Berlin, Germany). These projects, named Bridge the Gap I (2015), and Bridge the Gap II (2016), were carried out in Berlin and brought together teenagers with refugee and German...

  12. Bridge technology report

    CERN Document Server

    2013-01-01

    Please note this is a Short Discount publication. As LANs have proliferated, new technologies and system concepts have come to the fore. One of the key issues is how to interconnect networks. One means of interconnection is to use a 'bridge'. Other competing technologies are repeaters, routers, and gateways. Bridges permit traffic isolation, connect network segments together and operate at the MAC layer. Further, because they operate at the MAC layer, they can handle a variety of protocols such as TCP/IP, SNA, and X.25. This report focuses on the specific technology of bridging two netw

  13. Development of a digital solar simulator based on full-bridge converter

    Science.gov (United States)

    Liu, Chen; Feng, Jian; Liu, Zhilong; Tong, Weichao; Ji, Yibo

    2014-02-01

    With the development of solar photovoltaic, distribution schemes utilized in power grid had been commonly application, and photovoltaic (PV) inverter is an essential equipment in grid. In this paper, a digital solar simulator based on full-bridge structure is presented. The output characteristic curve of system is electrically similar to silicon solar cells, which can greatly simplify research methods of PV inverter, improve the efficiency of research and development. The proposed simulator consists on a main control board based on TM320F28335, phase-shifted zero-voltage-switching (ZVS) DC-DC full-bridge converter and voltage and current sampling circuit, that allows emulating the voltage-current curve with the open-circuit voltage (Voc) of 900V and the short-circuit current (Isc) of 18A .When the system connected to a PV inverter, the inverter can quickly track from the open-circuit to the maximum power point and keep stability.

  14. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Science.gov (United States)

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  15. Road Bridges and Culverts, Bridge dataset only includes bridges maintained by Johnson County Public Works in the unincorporated areas, Published in Not Provided, Johnson County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Road Bridges and Culverts dataset current as of unknown. Bridge dataset only includes bridges maintained by Johnson County Public Works in the unincorporated areas.

  16. Laboratory Testing of Precast Bridge Beck Panel Transverse Connections for Use in Accelerated Bridge Construction

    OpenAIRE

    Porter, Scott D.

    2009-01-01

    Precast concrete bridge deck panels have been used for decades to accelerate bridge construction. Cracking of the transverse connection between panels is a common problem that can damage deck overlays and cause connection leaking leading to corrosion of lower bridge elements. To better understand the behavior of bridge deck transverse female-to-female connections, shear and moment lab testing were performed at Utah State University for the Utah Department of Transportation. Two existing UDOT ...

  17. Human Errors and Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Nowak, A. S.

    on basis of reliability profiles for bridges without human errors are extended to include bridges with human errors. The first rehabilitation distributions for bridges without and with human errors are combined into a joint first rehabilitation distribution. The methodology presented is illustrated...... for reinforced concrete bridges....

  18. A bridge with a view, a view with a bridge : Identifying design considerations for bridges to strengthen regional identity

    NARCIS (Netherlands)

    Smits, J.E.P.; van der Hoeven, F.D.

    2015-01-01

    This paper discusses design considerations for creating high quality infrastructural artefacts with an emphasis on bridges. The authors pursue a design study and analysis approach to highlight the specifics of infrastructure design for regional identity, based on their own work on a bridge

  19. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    Science.gov (United States)

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  20. BUILDING A BETTER GLUTEAL BRIDGE: ELECTROMYOGRAPHIC ANALYSIS OF HIP MUSCLE ACTIVITY DURING MODIFIED SINGLE-LEG BRIDGES.

    Science.gov (United States)

    Lehecka, B J; Edwards, Michael; Haverkamp, Ryan; Martin, Lani; Porter, Kambry; Thach, Kailey; Sack, Richard J; Hakansson, Nils A

    2017-08-01

    Gluteal strength plays a role in injury prevention, normal gait patterns, eliminating pain, and enhancing athletic performance. Research shows high gluteal muscle activity during a single-leg bridge compared to other gluteal strengthening exercises; however, prior studies have primarily measured muscle activity with the active lower extremity starting in 90 ° of knee flexion with an extended contralateral knee. This standard position has caused reports of hamstring cramping, which may impede optimal gluteal strengthening. The purpose of this study was to determine which modified position for the single-leg bridge is best for preferentially activating the gluteus maximus and medius. Cross-Sectional. Twenty-eight healthy males and females aged 18-30 years were tested in five different, randomized single-leg bridge positions. Electromyography (EMG) electrodes were placed on subjects' gluteus maximus, gluteus medius, rectus femoris, and biceps femoris of their bridge leg (i.e., dominant or kicking leg), as well as the rectus femoris of their contralateral leg. Subjects performed a maximal voluntary isometric contraction (MVIC) for each tested muscle prior to performing five different bridge positions in randomized order. All bridge EMG data were normalized to the corresponding muscle MVIC data. A modified bridge position with the knee of the bridge leg flexed to 135 ° versus the traditional 90 ° of knee flexion demonstrated preferential activation of the gluteus maximus and gluteus medius compared to the traditional single-leg bridge. Hamstring activation significantly decreased (p bridge by flexing the active knee to 135 ° instead of 90 ° minimizes hamstring activity while maintaining high levels of gluteal activation, effectively building a bridge better suited for preferential gluteal activation. 3.

  1. The violin bridge as filter.

    Science.gov (United States)

    Bissinger, George

    2006-07-01

    The violin bridge filter role was investigated using modal and acoustic measurements on 12 quality-rated violins combined with systematic bridge rocking frequency f(rock) and wing mass decrements deltam on four bridges for two other violins. No isolated bridge resonances were observed; bridge motions were complex (including a "squat" mode near 0.8 kHz) except for low frequency rigid body pivot motions, all more or less resembling rocking motion at higher frequencies. A conspicuous broad peak near 2.3 kHz in bridge driving point mobility (labeled BH) was seen for good and bad violins. Similar structure was seen in averaged bridge, bridge feet, corpus mobilities and averaged radiativity. No correlation between violin quality and BH driving point, averaged corpus mobility magnitude, or radiativity was found. Increasing averaged-over-f(rock) deltam(g) from 0 to 0.12 generally increased radiativity across the spectrum. Decreasing averaged-over-deltam f(rock) from 3.6 to 2.6 kHz produced consistent decreases in radiativity between 3 and 4.2 kHz, but only few-percent decreases in BH frequency. The lowest f(rock) values were accompanied by significantly reduced radiation from the Helmholtz A0 mode near 280 Hz; this, combined with reduced high frequency output, created overall radiativity profiles quite similar to "bad" violins among the quality-rated violins.

  2. Role of multiprotein bridging factor 1 in archaea: bridging the domains?

    NARCIS (Netherlands)

    Koning, de B.; Blombach, F.; Wu Hao,; Brouns, S.J.J.; Oost, van der J.

    2009-01-01

    MBF1 (multiprotein bridging factor 1) is a highly conserved protein in archaea and eukaryotes. It was originally identified as a mediator of the eukaryotic transcription regulator BmFTZ-F1 (Bombyx mori regulator of fushi tarazu). MBF1 was demonstrated to enhance transcription by forming a bridge

  3. 23 CFR 650.809 - Movable span bridges.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  4. In Situ TEM Creation and Electrical Characterization of Nanowire Devices

    DEFF Research Database (Denmark)

    Kallesøe, Christian; Wen, Cheng-Yen; Booth, Timothy J.

    2012-01-01

    bridge devices in situ and relate these to the structure. We also describe processes to modify the contact and the nanowire surface after device formation. The technique we describe allows the direct analysis of the processes taking place during device formation and use, correlating specific nanoscale......We demonstrate the observation and measurement of simple nanoscale devices over their complete lifecycle from creation to failure within a transmission electron microscope. Devices were formed by growing Si nanowires, using the vapor–liquid–solid method, to form bridges between Si cantilevers. We...... structural and electrical parameters on an individual device basis....

  5. Functional nerve recovery after bridging a 15 mm gap in rat sciatic nerve with a biodegradable nerve guide

    NARCIS (Netherlands)

    Meek, MF; Klok, F; Robinson, PH; Nicolai, JPA; Gramsbergen, A; van der Werf, J.F.A.

    2003-01-01

    Recovery of nerve function was evaluated after bridging a 15 mm sciatic nerve gap in 51 rats with a biodegradable poly(DL-lactide-epsilon-caprolactone) nerve guide. Recovery of function was investigated by analysing the footprints, by analysing video recordings of gait, by electrically eliciting the

  6. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  7. Nonlinearity in oscillating bridges

    Directory of Open Access Journals (Sweden)

    Filippo Gazzola

    2013-09-01

    Full Text Available We first recall several historical oscillating bridges that, in some cases, led to collapses. Some of them are quite recent and show that, nowadays, oscillations in suspension bridges are not yet well understood. Next, we survey some attempts to model bridges with differential equations. Although these equations arise from quite different scientific communities, they display some common features. One of them, which we believe to be incorrect, is the acceptance of the linear Hooke law in elasticity. This law should be used only in presence of small deviations from equilibrium, a situation which does not occur in widely oscillating bridges. Then we discuss a couple of recent models whose solutions exhibit self-excited oscillations, the phenomenon visible in real bridges. This suggests a different point of view in modeling equations and gives a strong hint how to modify the existing models in order to obtain a reliable theory. The purpose of this paper is precisely to highlight the necessity of revisiting the classical models, to introduce reliable models, and to indicate the steps we believe necessary to reach this target.

  8. Coupling vibration research on Vehicle-bridge system

    Science.gov (United States)

    Zhou, Jiguo; Wang, Guihua

    2018-01-01

    The vehicle-bridge coupling system forms when vehicle running on a bridge. It will generate a relatively large influence on the driving comfort and driving safe when the vibration of the vehicle is bigger. A three-dimensional vehicle-bridge system with biaxial seven degrees of freedom has been establish in this paper based on finite numerical simulation. Adopting the finite element transient numerical simulation to realize the numerical simulation of vehicle-bridge system coupling vibration. Then, analyze the dynamic response of vehicle and bridge while different numbers of vehicles running on the bridge. Got the variation rule of vertical vibration of car body and bridge, and that of the contact force between the wheel and bridge deck. The research results have a reference value for the analysis about the vehicle running on a large-span cabled bridge.

  9. On equivalent resistance of electrical circuits

    Science.gov (United States)

    Kagan, Mikhail

    2015-01-01

    While the standard (introductory physics) way of computing the equivalent resistance of nontrivial electrical circuits is based on Kirchhoff's rules, there is a mathematically and conceptually simpler approach, called the method of nodal potentials, whose basic variables are the values of the electric potential at the circuit's nodes. In this paper, we review the method of nodal potentials and illustrate it using the Wheatstone bridge as an example. We then derive a closed-form expression for the equivalent resistance of a generic circuit, which we apply to a few sample circuits. The result unveils a curious interplay between electrical circuits, matrix algebra, and graph theory and its applications to computer science. The paper is written at a level accessible by undergraduate students who are familiar with matrix arithmetic. Additional proofs and technical details are provided in appendices.

  10. Nondestructive testing for bridge diagnosis

    International Nuclear Information System (INIS)

    Oshima, Toshiyuki; Mikami, Shuichi; Yamazaki, Tomoyuki

    1997-01-01

    There are many motivations for bridge diagnosis using Nondestructive testing (NDT) to monitor its integrity. The measured frequency and damping on real bridge are compared in one figure as a function of span length and general aspects are explained. These date were measured in every construction of bridges and applied to design new bridges. Ultrasonic testing is also well used for concrete and steel members mainly to detect internal damages or delaminations. Detail analysis on reflected waves gives us more accurate information about the defect. Experimental results are shown as examples in this paper.

  11. Salt bridges: geometrically specific, designable interactions.

    Science.gov (United States)

    Donald, Jason E; Kulp, Daniel W; DeGrado, William F

    2011-03-01

    Salt bridges occur frequently in proteins, providing conformational specificity and contributing to molecular recognition and catalysis. We present a comprehensive analysis of these interactions in protein structures by surveying a large database of protein structures. Salt bridges between Asp or Glu and His, Arg, or Lys display extremely well-defined geometric preferences. Several previously observed preferences are confirmed, and others that were previously unrecognized are discovered. Salt bridges are explored for their preferences for different separations in sequence and in space, geometric preferences within proteins and at protein-protein interfaces, co-operativity in networked salt bridges, inclusion within metal-binding sites, preference for acidic electrons, apparent conformational side chain entropy reduction on formation, and degree of burial. Salt bridges occur far more frequently between residues at close than distant sequence separations, but, at close distances, there remain strong preferences for salt bridges at specific separations. Specific types of complex salt bridges, involving three or more members, are also discovered. As we observe a strong relationship between the propensity to form a salt bridge and the placement of salt-bridging residues in protein sequences, we discuss the role that salt bridges might play in kinetically influencing protein folding and thermodynamically stabilizing the native conformation. We also develop a quantitative method to select appropriate crystal structure resolution and B-factor cutoffs. Detailed knowledge of these geometric and sequence dependences should aid de novo design and prediction algorithms. Copyright © 2010 Wiley-Liss, Inc.

  12. An Expert System for Concrete Bridge Management

    DEFF Research Database (Denmark)

    Brito, J. de; Branco, F. A.; Thoft-Christensen, Palle

    1997-01-01

    The importance of bridge repair versus new bridge construction has risen in recent decades due to high deterioration rates that have been observed in these structures. Budgets both for building new bridges and keeping the existing ones are always limited. To help rational decision-making, bridge...... management systems are presently being implemented by bridge authorities in several countries. The prototype of an expert system for concrete bridge management is presented in this paper, with its functionality relying on two modules. The inspection module relies on a periodic acquisition of field...... information complemented by a knowledge-based interactive system, BRIDGE-1. To optimize management strategies at the headquarters, the BRIDGE-2 module was implemented, including three submodules: inspection strategy, maintenance and repair....

  13. Model predictive control for a dual active bridge inverter with a floating bridge

    OpenAIRE

    Chowdhury, Shajjad; Wheeler, Patrick W.; Gerada, C.; Patel, Chintan

    2016-01-01

    This paper presents a Model Predictive Control technique applied to a dual active bridge inverter where one of the bridges is floating. The proposed floating bridge topology eliminates the need for isolation transformer in a dual inverter system and therefore reduces the size, weight and losses in the system. To achieve multilevel output voltage waveforms the floating inverter DC link capacitor is charged to the half of the main DC link voltage. A finite-set Model Predictive Control technique...

  14. Bridge over troubled water?

    DEFF Research Database (Denmark)

    Svendsen, Gunnar Lind Haase; Nannestad, Peter; Svendsen, Gert Tinggaard

    2008-01-01

    The problem of integrating non-Western immigrants into Western welfare states is the focus of this paper. To address this issue, we suggest a social capital approach in which we apply the conceptual pair of bridging social capital (BR), which connects an individual to the broader social structure...... relationship between the levels of bridging and bonding capital, suggesting that bonding social capital in the immigrant group does not seem to impede the establishment of the bridging social capital needed for integration....

  15. Bridge and steel structures. History and vision on bridge erection; Kyoryo kokozobutsu. Kasetsu gijutsu no shorai

    Energy Technology Data Exchange (ETDEWEB)

    Mukai, S.; Hayashi, T. [Sumitomo Heavy Industries, Ltd., Tokyo (Japan)

    1998-08-20

    This paper describes the progress of bridge erection technology. It introduces the results of cable erection, rotated/extruded erection, and cantilever erection. The cable erection is a multi point suspension erection using cables. For the rotated/extruded erection, the monolithic construction is conducted on a working yard set in a right angle to the construction position, and the horizontal beams of the bridge piers (corbel girders) are constructed by the rotated method using a slewing base incorporated around the bridge piers at one side. For the construction of stiffening girders of Innoshima-ohashi Bridge of Honshu-Shikoku Joint Bridge in 1978, trussed face bar blocks were extruded from the main tower in order using a travel crane. For the suspension bridges and cable stayed bridges, main towers were erected using various types of cranes. The erection of Tamashima-ohashi Bridge with a weight of 500 ton using an offshore floating crane is introduced as a large block method. Analysis methods and measurement techniques at the site are used in order to analyze the shape in each step under the erection and to ensure the accurate final complete shape. Reduction of the construction cost, improvement of erection technology, and technology development for large-scale projects are subjects in the future. 22 refs., 8 figs., 1 tab.

  16. Dragon bridge - the world largest dragon-shaped (ARCH steel bridge as element of smart city

    Directory of Open Access Journals (Sweden)

    Chinh Luong Minh

    2016-01-01

    Full Text Available Dragon Bridge - The world’s largest dragon-shaped steel bridge, with an installation cost of $85 million USD, features 6 lanes for two separate directions, 666 meters of undulating steel in the shape of a dragon in the Ly Dynasty, the symbol of prosperity in Vietnamese culture. This unique and beautifully lit bridge, which also breathes fire and sprays water. It’s the purposeful integration of the lighting hardware articulates the dragon’s form, and the fire-breathing dragon head. This project transcends the notion of monumental bridge with dynamic colour-changing lighting, creating an iconic sculpture in the skyline that is both reverent and whimsical. The signature feature of the bridge was the massive undulating support structure resembling a dragon flying over the river. The dragon is prominent in Vietnamese culture as a symbol of power and nobility. Dragon Bridge stands out as a model of innovation. It has received worldwide attention in the design community and from the global media for its unique arch support system. Dragon Bridge serves as an example of how aesthetic quality of a design can serve cultural, economic and functional purposes. The article presents design solutions of the object and the evaluation of the technical condition before putting the facility into service.

  17. Experimental investigation of different fill materials in arch bridges with particular focus on Pearl-Chain Bridges

    DEFF Research Database (Denmark)

    Lund, Mia Schou Møller; Hansen, Kurt Kielsgaard; Hertz, Kristian Dahl

    2016-01-01

    Pearl-Chain Bridge technology is a recently developed prefabricated arch solution for road and railway bridges allowing faster, more environmentally friendly, and cheaper bridge construction. This study compared the strength and durability properties of three different types of fill material...

  18. Bridge element deterioration rates.

    Science.gov (United States)

    2008-10-01

    This report describes the development of bridge element deterioration rates using the NYSDOT : bridge inspection database using Markov chains and Weibull-based approaches. It is observed : that Weibull-based approach is more reliable for developing b...

  19. Bridge-Vehicle Impact Assessment

    Science.gov (United States)

    2011-08-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  20. Bridge vehicle impact assessment.

    Science.gov (United States)

    2011-12-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  1. Wireless Smart Sensor Network System Using SmartBridge Sensor Nodes for Structural Health Monitoring of Existing Concrete Bridges

    Science.gov (United States)

    Gaviña, J. R.; Uy, F. A.; Carreon, J. D.

    2017-06-01

    There are over 8000 bridges in the Philippines today according to the Department of Public Works and Highways (DPWH). Currently, visual inspection is the most common practice in monitoring the structural integrity of bridges. However, visual inspections have proven to be insufficient in determining the actual health or condition of a bridge. Structural Health Monitoring (SHM) aims to give, in real-time, a diagnosis of the actual condition of the bridge. In this study, SmartBridge Sensor Nodes were installed on an existing concrete bridge with American Association of State Highway and Transportation Officials (AASHTO) Type IV Girders to gather vibration of the elements of the bridge. Also, standards on the effective installation of SmartBridge Sensor Nodes, such as location and orientation was determined. Acceleration readings from the sensor were then uploaded to a server, wherein they are monitored against certain thresholds, from which, the health of the bridge will be derived. Final output will be a portal or webpage wherein the information, health, and acceleration readings of the bridge will be available for viewing. With levels of access set for different types of users, the main users will have access to download data and reports. Data transmission and webpage access are available online, making the SHM system wireless.

  2. Horizontal bridges in polar dielectric liquids

    Science.gov (United States)

    Woisetschläger, Jakob; Wexler, Adam D.; Holler, Gert; Eisenhut, Mathias; Gatterer, Karl; Fuchs, Elmar C.

    2012-01-01

    When a high-voltage direct-current is applied to two beakers filled with polar liquid dielectrica like water or methanol, a horizontal bridge forms between the two beakers. By repeating a version of Pellat's experiment, it is shown that a horizontal bridge is stable by the action of electrohydrodynamic pressure. Thus, the static and dynamic properties of the phenomenon called a `floating water bridge' can be explained by the gradient of Maxwell pressure, replenishing the liquid within the bridge against any drainage mechanism. It is also shown that a number of liquids can form stable and long horizontal bridges. The stability of such a connection, and the asymmetry in mass flow through such bridges caused by the formation of ion clouds in the vicinity of the electrodes, is also discussed by two further experiments.

  3. LTBP bridge performance primer.

    Science.gov (United States)

    2013-12-01

    "The performance of bridges is critical to the overall performance of the highway transportation system in the United States. However, many critical aspects of bridge performance are not well understood. The reasons for this include the extreme diver...

  4. 33 CFR 115.70 - Advance approval of bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  5. Numerical analysis of dynamic response of vehicle–bridge coupled system on long-span continuous girder bridge

    Directory of Open Access Journals (Sweden)

    Lipeng An

    2016-07-01

    Full Text Available To systematically study the vehicle–bridge coupled dynamic response and its change rule with different parameters, a vehicle model with seven degrees of freedom was built and the total potential energy of vehicle space vibration system was deduced. Considering the stimulation of road roughness, the dynamic response equation of vehicle–bridge coupled system was established in accordance with the elastic system principle of total potential energy with stationary value and the “set-in-right-position” rule. On the basis of the self-compiled Fortran program and bridge engineering, the dynamic response of long-span continuous girder bridge under vehicle load was studied. This study also included the calculation of vehicle impact coefficient, evaluation of vibration comfort, and analysis of dynamic response parameters. Results show the impact coefficient changes with lane number and is larger than the value calculated by the “general code for design of highway bridges and culverts (China”. The Dieckmann index of bridge vibration is also related to lane number, and the vibration comfort evaluation is good in normal conditions. The relevant conclusions from parametric analyses have practical significance to dynamic design and daily operation of long-span continuous girder bridges in expressways. Safety and comfort are expected to improve significantly with further control of the vibration of vehicle–bridge system.

  6. Bridge Scour Technology Transfer

    Science.gov (United States)

    2018-01-24

    Scour and flooding are the leading causes of bridge failures in the United States and therefore should be monitored. New applications of tools and technologies are being developed, tested, and implemented to reduce bridge scour risk. The National Coo...

  7. Revised Rules for Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Jensen, F. M.; Middleton, C.

    This paper is based on research performed for the Highway Agency, London, UK under the project DPU/9/44 "Revision of Bridge Assessment Rules Based on Whole Life Performance: Concrete Bridges" It contains details of a methodology which can be used to generate Whole Life (WL) reliability profiles....... These WL reliability profiles may be used to establish revised rules for Concrete Bridges....

  8. The stories of two bridges in Ghana

    DEFF Research Database (Denmark)

    Andreasen, Jørgen

    2004-01-01

    Public participation in bridge building was promoted by un habitat in the village of Mankrong. The neighbouring village did not participate in the construction of their bridge. The first flooding washed the second bridge down while the "participative bridge" stood up....

  9. Bridging the Gap

    DEFF Research Database (Denmark)

    Dahlberg, Rasmus

    2016-01-01

    The fixed link between Denmark and Sweden connects two busy cities and a large international airport with many of its travelers and employees. 18,000 vehicles and 160 passenger trains transport each day more than 70,000 people across the combined road and rail Øresund Bridge and through the Øresu...... in its final report to the Danish and Swedish transport authorities while drawing upon experiences from two recent comparable cases of infrastructure disruptions: The Champlain Bridge (2009) and the Forth Road Bridge (2015).......The fixed link between Denmark and Sweden connects two busy cities and a large international airport with many of its travelers and employees. 18,000 vehicles and 160 passenger trains transport each day more than 70,000 people across the combined road and rail Øresund Bridge and through the Øresund...... Tunnel, approximately 25,000 of them critical to the regional work market. Even though the risk analysis states that the likelihood of a long-term closure (100C days) is very low Danish and Swedish transport authorities have demanded that the infrastructure operator conducts a survey of the preparedness...

  10. A probabilistic analysis of electrical equipment vulnerability to carbon fibers

    Science.gov (United States)

    Elber, W.

    1980-01-01

    The statistical problems of airborne carbon fibers falling onto electrical circuits were idealized and analyzed. The probability of making contact between randomly oriented finite length fibers and sets of parallel conductors with various spacings and lengths was developed theoretically. The probability of multiple fibers joining to bridge a single gap between conductors, or forming continuous networks is included. From these theoretical considerations, practical statistical analyses to assess the likelihood of causing electrical malfunctions was produced. The statistics obtained were confirmed by comparison with results of controlled experiments.

  11. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction : research brief

    Science.gov (United States)

    2017-09-01

    This study is to develop simulation methodology to conduct the dynamic assessment of bridge deck performance subjected to traffic. Concrete bridge decks are exposed to daily traffic loads and may experience some surface cracking caused by excessive s...

  12. Development of a precast bridge deck overhang system for the rock creek bridge.

    Science.gov (United States)

    2008-12-01

    Precast, prestressed panels are commonly used at interior beams for bridges in Texas. The use of these : panels provides ease of construction, sufficient capacity, and good economy for the construction of : bridges in Texas. Current practice for the ...

  13. Field performance of timber bridges. 13, Mohawk Canal stress-laminated bridge

    Science.gov (United States)

    P. D. Hilbrich Lee; X. Lauderdale

    The Mohawk Canal bridge was constructed in August 1994, just outside Roll, Arizona. It is a simple-span, double-lane, stress-laminated deck superstructure, approximately 6.4 m (21 ft) long and 10.4 m (34 ft) wide and constructed with Combination 16F-V3 Douglas Fir glued-laminated timber beam laminations. The performance of the bridge was monitored continuously for 2...

  14. Development of inspection robots for bridge cables.

    Science.gov (United States)

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  15. Horizontal bridges in polar dielectric liquids

    Energy Technology Data Exchange (ETDEWEB)

    Woisetschlaeger, Jakob [Graz University of Technology, Experimental Turbomachinery Research and Optical Measurement Group, Institute for Thermal Turbomachinery and Machine Dynamics, Graz (Austria); Wexler, Adam D.; Fuchs, Elmar C. [Wetsus, Center of Excellence for Sustainable Water Technology, Leeuwarden (Netherlands); Holler, Gert [Graz University of Technology, Institute of Electrical Measurement and Measurement Signal Processing, Graz (Austria); Eisenhut, Mathias [Graz University of Technology, Institute of Analytical Chemistry and Food Chemistry, Graz (Austria); Gatterer, Karl [Graz University of Technology, Institute of Physical and Theoretical Chemistry, Graz (Austria)

    2012-01-15

    When a high-voltage direct-current is applied to two beakers filled with polar liquid dielectrica like water or methanol, a horizontal bridge forms between the two beakers. By repeating a version of Pellat's experiment, it is shown that a horizontal bridge is stable by the action of electrohydrodynamic pressure. Thus, the static and dynamic properties of the phenomenon called a 'floating water bridge' can be explained by the gradient of Maxwell pressure, replenishing the liquid within the bridge against any drainage mechanism. It is also shown that a number of liquids can form stable and long horizontal bridges. The stability of such a connection, and the asymmetry in mass flow through such bridges caused by the formation of ion clouds in the vicinity of the electrodes, is also discussed by two further experiments. (orig.)

  16. Lean Construction Applications for Bridge Inspection

    Science.gov (United States)

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  17. Spread prestressed concrete slab beam bridges.

    Science.gov (United States)

    2015-04-01

    TxDOT uses prestressed slab beam bridges for short-span bridges ranging from approximately 3050 ft in : length. These bridges have precast, pretensioned slab beams placed immediately adjacent to one another : with a cast-in-place slab made composi...

  18. Hydrodynamic forces on inundated bridge decks

    Science.gov (United States)

    2009-05-01

    The hydrodynamic forces experienced by an inundated bridge deck have great importance in the design of bridges. Specifically, the drag force, lift force, and the moment acting on the bridge deck under various levels of inundation and a range of flow ...

  19. Development of Inspection Robots for Bridge Cables

    Directory of Open Access Journals (Sweden)

    Hae-Bum Yun

    2013-01-01

    Full Text Available This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  20. Design and construction of Chiburiko Bridge (stress ribbon bridge). Chiburiko bashi (tsurishoban kyo) no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Kamisakoda, K; Tokuyama, S; Sano, K; Onuma, K [Kashima Corp., Tokyo (Japan)

    1992-07-30

    Chiburiko Bridge lies across Chiburiko which is a lake for agricultural water, and is used by people, carts and cars for administration. It is a stressed-ribbon bridge with the road surface made with concrete covered bands of cables stretched between abutments, and is the first highway bridge in Japan. A report is made on the plan and construction of the bridge. Integration of the precast slab with the cast-in-place concrete as well as mutual integration of the precast slabs are validated by the use of a reproduced model of a part of the bridge. Floor slabs are suspended by cables, and can be constructed with no form nor support by integrating cast-in-place concrete with the precast slabs on mutually joined precast slabs. It has been said that the stressed-ribbon bridge has a structure suitable for long span bridges because it has a simple structure. Studies, however, seems to be necessary on the impact caused by running of vehicles and on the wind resisting stability. 3 refs., 17 figs., 2 tabs.

  1. The South Carolina bridge-scour envelope curves

    Science.gov (United States)

    Benedict, Stephen T.; Feaster, Toby D.; Caldwell, Andral W.

    2016-09-30

    The U.S. Geological Survey, in cooperation with the South Carolina Department of Transportation, conducted a series of three field investigations to evaluate historical, riverine bridge scour in the Piedmont and Coastal Plain regions of South Carolina. These investigations included data collected at 231 riverine bridges, which lead to the development of bridge-scour envelope curves for clear-water and live-bed components of scour. The application and limitations of the South Carolina bridge-scour envelope curves were documented in four reports, each report addressing selected components of bridge scour. The current investigation (2016) synthesizes the findings of these previous reports into a guidance manual providing an integrated procedure for applying the envelope curves. Additionally, the investigation provides limited verification for selected bridge-scour envelope curves by comparing them to field data collected outside of South Carolina from previously published sources. Although the bridge-scour envelope curves have limitations, they are useful supplementary tools for assessing the potential for scour at riverine bridges in South Carolina.

  2. Assessment of structural condition of Libeň Bridge

    Directory of Open Access Journals (Sweden)

    Kněž Petr

    2017-01-01

    Full Text Available The paper presents diagnostic and load tests of the Inundation bridge which is part of a group of bridges called The Libeň bridge group in Prague. The Libeň bridge group consists of two arched and several framed bridges spanning the Vltava river. One of the vaulted bridges consists of 5 arches and the other vaulted bridge (called Inundation bridge consists of only one arch. Arched bridges are extraordinary structures with both technical and historical value. Since the inundation bridge has the largest arch of whole group, it was selected for testing purposes. The bridge is assembled with three-hinged arch made of concrete. The hinges are made of reinforced concrete and lead contact slabs. Detailed measurements of geometry and material properties were made on the bridge. Based on these measurements a computer model was created to verify the behavior of the structure. Both static and dynamic calculations were performed. Measurements of dynamic characteristics were made during normal operation and with hydraulic vibration exciter. This article will focus on comparing the results of dynamic calculation of the modeled structure and properties measured on real structure excited by hydraulic vibration exciter.

  3. Electricity generation from the mud by using microbial fuel cell

    Directory of Open Access Journals (Sweden)

    Idris Sitinoor Adeib

    2016-01-01

    Full Text Available Microbial fuel cells (MFCs is a bio-electrochemical device that harnesses the power of respiring microbes to convert organic substrates directly into electrical energy. This is achieved when bacteria transfer electrons to an electrode rather than directly to an electron acceptor. Their technical feasibility has recently been proven and there is great enthusiasm in the scientific community that MFCs could provide a source of “green electricity”. Microbial fuel cells work by allowing bacteria to do what they do best, oxidize and reduce organic molecules. Bacterial respiration is basically one big redox reaction in which electrons are being moved around. The objective is to generate electricity throughout the biochemical process using chemical waste basically sludge, via microbial fuel cells. The methodology includes collecting sludge from different locations, set up microbial fuel cells with the aid of salt bridge and observing the results in voltage measurement. The microbial fuel cells consist of two chambers, iron electrodes, copper wire, air pump (to increase the efficiency of electron transfer, water, sludge and salt bridge. After several observations, it is seen that this MFC can achieve up until 202 milivolts (0.202volts with the presence of air pump. It is proven through the experiments that sludge from different locations gives different results in term of the voltage measurement. This is basically because in different locations of sludge contain different type and amount of nutrients to provide the growth of bacteria. Apart from that, salt bridge also play an important role in order to transport the proton from cathode to anode. A longer salt bridge will give a higher voltage compared to a short salt bridge. On the other hand, the limitations that this experiment facing is the voltage that being produced did not last long as the bacteria activity slows down gradually and the voltage produced are not really great in amount. Lastly to

  4. Students design composite bridges

    NARCIS (Netherlands)

    Stark, J.W.B.; Galjaard, J.C.; Brekelmans, J.W.P.M.

    1999-01-01

    The paper gives an overview of recent research on steel-concrete composite bridge design by students of Delft University of Technology doing their master's thesis. Primary objective of this research was to find possibilities for application of steel-concrete composite bridges in the Netherlands,

  5. 33 CFR 118.140 - Painting bridge piers.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  6. Superconductivity in small metal bridges

    International Nuclear Information System (INIS)

    Hannah, E.C.

    1975-01-01

    Josephson effects in weaklinks are discussed for low and high frequency regimes using simple perturbation techniques. It is proven that no measurement of the supercurrent dependence upon frequency above the Riedel peak frequency can be made using rf sources whose frequencies are below the Riedel peak. Thus the bulk of work done in the field on the high frequency structure of the Josephson current is shown to be invalid. Metal bridges shorter than a newly defined temperature independent length for superconductors, l/sub PHONON/, are proven to be identical in their Josephson current behavior to tunneling junctions. The BCS gap equation is generalized to include voltage gradient effects on pairs within the bridge. The oscillation frequency for long bridges (l/sub BRIDGE/ greater than l/sub PHONON/) is shown to be limited to less than 10'' Hz. An experimental test of the new voltage dependent gap is made as well as tests of the pair reforming time of bridges

  7. Bridge scour monitoring technologies : development of evaluation and selection protocols for application on river bridges in Minnesota.

    Science.gov (United States)

    2010-03-01

    Bridge failure or loss of structural integrity can result from scour of riverbed sediment near bridge abutments or : piers during high-flow events in rivers. In the past 20 years, several methods of monitoring bridge scour have been : developed spann...

  8. Electrical aspects of rainout

    International Nuclear Information System (INIS)

    Rosenkilde, C.E.

    1981-01-01

    Rainout commonly denotes the aggregate of phenomena associated with precipitation scavenging of radioactivity from a cloud of nuclear debris that is within a natural rain cloud. (In contrast, the term, washout, is applicable when the nuclear cloud is below the rain cloud and the term, fallout, commonly denotes the direct gravitational settling of contaminated solid material from a nuclear cloud.) Nuclear debris aerosols may be scavenged within natural clouds by a variety of different physical processes which may involve diffusion, convection, impaction, nucleation, phoresis, turbulence, and/or electricity among others. Processes which involve electrical aspects are scrutinized for their susceptibility to the intimate presence of the radioactive-cloud environment. This particular choice of electrical processes is not accidental. Nearly all of the listed processes were examined earlier by Williams. His rough estimates suggested that electrical effects, and to a lesser extent turbulence, could enhance the scavenging of those submicron aerosols which reside in the size-range that bridges the minimum in the scavenging rate coefficient which is commonly called the Greenfield gap. This minimum in the scavenging-rate coefficient is created by the simultaneous reduction of scavenging via diffusion and the reduction of scavenging via inertial impaction. However, Williams omitted the specific influence of a radioactive environment. This report aims to remedy this omission

  9. Multiple Bistability in Quinonoid-Bridged Diiron(II) Complexes: Influence of Bridge Symmetry on Bistable Properties.

    Science.gov (United States)

    van der Meer, Margarethe; Rechkemmer, Yvonne; Breitgoff, Frauke D; Marx, Raphael; Neugebauer, Petr; Frank, Uta; van Slageren, Joris; Sarkar, Biprajit

    2016-11-21

    Quinonoid bridges are well-suited for generating dinuclear assemblies that might display various bistable properties. In this contribution we present two diiron(II) complexes where the iron(II) centers are either bridged by the doubly deprotonated form of a symmetrically substituted quinonoid bridge, 2,5-bis[4-(isopropyl)anilino]-1,4-benzoquinone (H 2 L2') with a [O,N,O,N] donor set, or with the doubly deprotonated form of an unsymmetrically substituted quinonoid bridge, 2-[4-(isopropyl)anilino]-5-hydroxy-1,4-benzoquinone (H 2 L5') with a [O,O,O,N] donor set. Both complexes display temperature-induced spin crossover (SCO). The nature of the SCO is strongly dependent on the bridging ligand, with only the complex with the [O,O,O,N] donor set displaying a prominent hysteresis loop of about 55 K. Importantly, only the latter complex also shows a pronounced light-induced spin state change. Furthermore, both complexes can be oxidized to the mixed-valent iron(II)-iron(III) form, and the nature of the bridge determines the Robin and Day classification of these forms. Both complexes have been probed by a battery of electrochemical, spectroscopic, and magnetic methods, and this combined approach is used to shed light on the electronic structures of the complexes and on bistability. The results presented here thus show the potential of using the relatively new class of unsymmetrically substituted bridging quinonoid ligands for generating intriguing bistable properties and for performing site-specific magnetic switching.

  10. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  11. 33 CFR 118.100 - Retroreflective panels on bridge piers.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Retroreflective panels on bridge... SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.100 Retroreflective panels on bridge piers. The... 12 inches square. (c) To mark bridge piers or channel sides on bridges not required to have bridge...

  12. Concrete-Filled Steel Tube Arch Bridges in China

    Directory of Open Access Journals (Sweden)

    Jielian Zheng

    2018-02-01

    Full Text Available In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key construction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world’s longest CFST arch bridge—the First Hejiang Yangtze River Bridge. The main construction technologies of reinforced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges—the Guangxi Yongning Yong River Bridge and the Yunnan–Guangxi Railway Nanpan River Bridge—is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges. Keywords: Concrete-filled steel tube (CFST arch bridge, Steel-reinforced concrete arch bridge, Cable-stayed fastening-hanging cantilever assembly, Vacuum-assisted pouring in-tube concrete, Adjusting load by stay cables

  13. Reliability Modeling of Double Beam Bridge Crane

    Science.gov (United States)

    Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li

    2018-05-01

    This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.

  14. LIGHT BRIDGE IN A DEVELOPING ACTIVE REGION. I. OBSERVATION OF LIGHT BRIDGE AND ITS DYNAMIC ACTIVITY PHENOMENA

    International Nuclear Information System (INIS)

    Toriumi, Shin; Katsukawa, Yukio; Cheung, Mark C. M.

    2015-01-01

    Light bridges, the bright structures that divide the umbra of sunspots and pores into smaller pieces, are known to produce a wide variety of activity events in solar active regions (ARs). It is also known that the light bridges appear in the assembling process of nascent sunspots. The ultimate goal of this series of papers is to reveal the nature of light bridges in developing ARs and the occurrence of activity events associated with the light bridge structures from both observational and numerical approaches. In this first paper, exploiting the observational data obtained by Hinode, the Interface Region Imaging Spectrograph, and the Solar Dynamics Observatory, we investigate the detailed structure of the light bridge in NOAA AR 11974 and its dynamic activity phenomena. As a result, we find that the light bridge has a weak, horizontal magnetic field, which is transported from the interior by a large-scale convective upflow and is surrounded by strong, vertical fields of adjacent pores. In the chromosphere above the bridge, a transient brightening occurs repeatedly and intermittently, followed by a recurrent dark surge ejection into higher altitudes. Our analysis indicates that the brightening is the plasma heating due to magnetic reconnection at lower altitudes, while the dark surge is the cool, dense plasma ejected from the reconnection region. From the observational results, we conclude that the dynamic activity observed in a light bridge structure such as chromospheric brightenings and dark surge ejections are driven by magnetoconvective evolution within the light bridge and its interaction with the surrounding magnetic fields

  15. LIGHT BRIDGE IN A DEVELOPING ACTIVE REGION. I. OBSERVATION OF LIGHT BRIDGE AND ITS DYNAMIC ACTIVITY PHENOMENA

    Energy Technology Data Exchange (ETDEWEB)

    Toriumi, Shin; Katsukawa, Yukio [National Astronomical Observatory of Japan, 2-21-1 Osawa, Mitaka, Tokyo 181-8588 (Japan); Cheung, Mark C. M., E-mail: shin.toriumi@nao.ac.jp [Lockheed Martin Solar and Astrophysics Laboratory, 3251 Hanover Street, Building/252, Palo Alto, CA 94304 (United States)

    2015-10-01

    Light bridges, the bright structures that divide the umbra of sunspots and pores into smaller pieces, are known to produce a wide variety of activity events in solar active regions (ARs). It is also known that the light bridges appear in the assembling process of nascent sunspots. The ultimate goal of this series of papers is to reveal the nature of light bridges in developing ARs and the occurrence of activity events associated with the light bridge structures from both observational and numerical approaches. In this first paper, exploiting the observational data obtained by Hinode, the Interface Region Imaging Spectrograph, and the Solar Dynamics Observatory, we investigate the detailed structure of the light bridge in NOAA AR 11974 and its dynamic activity phenomena. As a result, we find that the light bridge has a weak, horizontal magnetic field, which is transported from the interior by a large-scale convective upflow and is surrounded by strong, vertical fields of adjacent pores. In the chromosphere above the bridge, a transient brightening occurs repeatedly and intermittently, followed by a recurrent dark surge ejection into higher altitudes. Our analysis indicates that the brightening is the plasma heating due to magnetic reconnection at lower altitudes, while the dark surge is the cool, dense plasma ejected from the reconnection region. From the observational results, we conclude that the dynamic activity observed in a light bridge structure such as chromospheric brightenings and dark surge ejections are driven by magnetoconvective evolution within the light bridge and its interaction with the surrounding magnetic fields.

  16. Bridge Aesthetics and Structural Honesty

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1999-01-01

    In bridges the overall form must be chosen with due respect to the transmission of forces if efficient structures shall be created, The design must therefore be governed by experienced structural engineers - in some cases assisted by aesthetic advisers on specific issues. Some basic requirements...... decisive for choosing the form of trusses, arches and cable-stayed bridges are outlined, and several examples show bridges designed without giving priority to the structural aspects....

  17. Strategies For The Replacement Of Historic Bridge Guardrails

    OpenAIRE

    Clauss, Adam J.

    2014-01-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridges can be subject to protection because of the role they play in aesthetics. Unfortunately, original railings on historic bridges do not typically meet current crash-test requirements and typically do not meet current standards for railing height and...

  18. When, where and how the bridge breaks: anaphase bridge breakage plays a crucial role in gene amplification and HSR generation

    International Nuclear Information System (INIS)

    Shimizu, Noriaki; Shingaki, Kenta; Kaneko-Sasaguri, Yukiko; Hashizume, Toshihiko; Kanda, Teru

    2005-01-01

    Amplified genes are frequently localized on extrachromosomal double minutes (DMs) or in chromosomal homogenously staining regions (HSRs). We previously showed that a plasmid bearing a mammalian replication initiation region could efficiently generate DMs and HSRs after transfection into human tumor cell lines. The Breakage-Fusion-Bridge (BFB) cycle model, a classical model that explains how HSRs form, could also be used to explain how the transfected plasmids generate HSRs. The BFB cycle model involves anaphase bridge formation due to the presence of dicentric chromosomes, followed by the breakage of the bridge. In this study, we used our plasmid-based model system to analyze how anaphase bridges break during mitosis. Dual-color fluorescence in situ hybridization analyses revealed that anaphase bridges were most frequently severed in their middle irrespective of their lengths, which suggests that a structurally fragile site exists in the middle of the anaphase bridge. Breakage of the chromosomal bridges occurred prior to nuclear membrane reformation and the completion of cytokinesis, which indicates that mechanical tension rather than cytokinesis is primarily responsible for severing anaphase bridges. Time-lapse observation of living cells revealed that the bridges rapidly shrink after being severed. If HSR length was extended too far, the bridge could no longer be resolved and became tangled depending on the tension. The unbroken bridge appeared to inhibit the completion of cytokinesis. These observations strongly suggest that anaphase bridges are highly elastic and that the length of the spindle axis determines the maximal HSR length

  19. 33 CFR 118.70 - Lights on swing bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on swing bridges. 118.70 Section 118.70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each...

  20. 33 CFR 118.65 - Lights on fixed bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on fixed bridges. 118.65 Section 118.65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable...

  1. 23 CFR 650.409 - Evaluation of bridge inventory.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge inventory, a sufficiency rating will be assigned to each bridge by the Secretary in accordance with the...

  2. Effects of Electrolyte on Floating Water Bridge

    OpenAIRE

    Hideo Nishiumi; Fumitaka Honda

    2009-01-01

    Fuchs found phenomena that when high voltage is applied to deionized water filled in two contacted beakers, a floating water bridge forms spontaneously. In this paper, we examined flow direction of water bridge and what effects the addition of electrolytes such as NaCl, NaOH, and N H 4 C l to the floating water bridge would give. We found that ionization degree reduced the length of water bridge though insoluble electrolyte A l 2 O 3 had no effect on the length of water bridge.

  3. A data management infrastructure for bridge monitoring

    Science.gov (United States)

    Jeong, Seongwoon; Byun, Jaewook; Kim, Daeyoung; Sohn, Hoon; Bae, In Hwan; Law, Kincho H.

    2015-04-01

    This paper discusses a data management infrastructure framework for bridge monitoring applications. As sensor technologies mature and become economically affordable, their deployment for bridge monitoring will continue to grow. Data management becomes a critical issue not only for storing the sensor data but also for integrating with the bridge model to support other functions, such as management, maintenance and inspection. The focus of this study is on the effective data management of bridge information and sensor data, which is crucial to structural health monitoring and life cycle management of bridge structures. We review the state-of-the-art of bridge information modeling and sensor data management, and propose a data management framework for bridge monitoring based on NoSQL database technologies that have been shown useful in handling high volume, time-series data and to flexibly deal with unstructured data schema. Specifically, Apache Cassandra and Mongo DB are deployed for the prototype implementation of the framework. This paper describes the database design for an XML-based Bridge Information Modeling (BrIM) schema, and the representation of sensor data using Sensor Model Language (SensorML). The proposed prototype data management framework is validated using data collected from the Yeongjong Bridge in Incheon, Korea.

  4. Railway bridge monitoring during construction and sliding

    Science.gov (United States)

    Inaudi, Daniele; Casanova, Nicoletta; Kronenberg, Pascal; Vurpillot, Samuel

    1997-05-01

    The Moesa railway bridge is a composite steel concrete bridge on three spans of 30 m each. The 50 cm thick concrete deck is supported on the lower flanges of two continuous, 2.7 m high I-beams. The bridge has been constructed alongside an old metallic bridge. After demolishing this one, the new bridge has been slid for 5 m by 4 hydraulic jacks and positioned on the refurbished piles of the old bridge. About 30 fiber optic, low-coherence sensors were imbedded in the concrete deck to monitor its deformations during concrete setting and shrinkage, as well as during the bridge sliding phase. In the days following concrete pour it was possible to follow its thermal expansion due to the exothermic setting reaction and the following thermal and during shrinkage. The deformations induced by the additional load produced by the successive concreting phases were also observed. During the bridge push, which extended over six hours, the embedded and surface mounted sensors allowed the monitoring of the curvature variations in the horizontal plane due to the slightly uneven progression of the jacks. Excessive curvature and the resulting cracking of concrete could be ruled out by these measurements. It was also possible to observe the bridge elongation under the heating action of the sun.

  5. On the effect of nuclear bridge modes on donor-acceptor electronic coupling in donor-bridge-acceptor molecules

    International Nuclear Information System (INIS)

    Davis, Daly; Toroker, Maytal Caspary; Speiser, Shammai; Peskin, Uri

    2009-01-01

    We report a theoretical study of intra-molecular electronic coupling in a symmetric DBA (donor-bridge-acceptor) complex, in which a donor electronic site is coupled to an acceptor site by way of intervening orbitals of a molecular bridge unit. In the off-resonant (deep tunneling) regime of electronic transport, the lowest unoccupied molecular orbitals (MO's) of the DBA system are split into distinguishable donor/acceptor and bridge orbitals. The effect of geometrical changes at the bridge on the donor/acceptor electronic energy manifold is studied for local stretching and bending modes. It is demonstrated that the energy splitting in the manifold of donor/acceptor unoccupied MOs changes in response to such changes, as assumed in simple McConnell-type models. Limitations of the simple models are revealed where the electronic charging of the bridge orbitals correlates with increasing donor/acceptor orbital energy splitting only for stretching but not for bending bridge modes.

  6. IceBridge Mission Flight Reports

    Data.gov (United States)

    National Aeronautics and Space Administration — The IceBridge Mission Flight Reports data set contains flight reports from NASA Operation IceBridge Greenland, Arctic, Antarctic, and Alaska missions. Flight reports...

  7. Bridges analysis, design, structural health monitoring, and rehabilitation

    CERN Document Server

    Bakht, Baidar

    2015-01-01

    This book offers a valuable guide for practicing bridge engineers and graduate students in structural engineering; its main purpose is to present the latest concepts in bridge engineering in fairly easy-to-follow terms. The book provides details of easy-to-use computer programs for: ·      Analysing slab-on-girder bridges for live load distribution. ·      Analysing slab and other solid bridge components for live load distribution. ·      Analysing and designing concrete deck slab overhangs of girder bridges under vehicular loads. ·      Determining the failure loads of concrete deck slabs of girder bridges under concentrated wheel loads. In addition, the book includes extensive chapters dealing with the design of wood bridges and soil-steel bridges. Further, a unique chapter on structural health monitoring (SHM) will help bridge engineers determine the actual load carrying capacities of bridges, as opposed to their perceived analytical capacities. The chapter addressing structures...

  8. Virtual Bridge Design Challenge

    Science.gov (United States)

    Mitts, Charles R.

    2013-01-01

    This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…

  9. The floating water bridge

    International Nuclear Information System (INIS)

    Fuchs, Elmar C; Woisetschlaeger, Jakob; Gatterer, Karl; Maier, Eugen; Pecnik, Rene; Holler, Gert; Eisenkoelbl, Helmut

    2007-01-01

    When high voltage is applied to distilled water filled in two glass beakers which are in contact, a stable water connection forms spontaneously, giving the impression of a floating water bridge. A detailed experimental analysis reveals static and dynamic structures as well as heat and mass transfer through this bridge

  10. MODERN ASPECTS OF BRIDGES MONITORING

    Directory of Open Access Journals (Sweden)

    M. I. Kazakevych

    2007-12-01

    Full Text Available The major concepts of the elaboration and realization of the bridge construction monitoring systemic approach are presented in this paper. The main peculiarity of the bridge monitoring modern aspect is pointed out here, namely, the transition from the demands of providing the reliability to the demands of providing the whole complex of the structure consumer qualities. The criteria of diagnostics of the bridge exploitation reliability as the fundamental aim of monitoring are formulated here.

  11. 75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Science.gov (United States)

    2010-10-07

    ... INFORMATION CONTACT: Ms. Ann Shemaka, Office of Bridge Technology, HIBT-30, (202) 366-1575, or Mr. Thomas Everett, Office of Bridge Technology, HIBT-30, (202) 366-4675, Federal Highway Administration, 1200 New... is categorized by the following material types, which are identified in the NBI: steel, concrete, pre...

  12. 77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Science.gov (United States)

    2012-08-31

    ... INFORMATION CONTACT: Ms. Ann Shemaka, Office of Bridge Technology, (202) 366-1575, or via email at [email protected] or Mr. Thomas Everett, Office of Bridge Technology, (202) 366-4675, or via email at thomas... the NBI: steel, concrete, pre-stressed concrete, and other. The category ``other'' includes wood...

  13. 76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Science.gov (United States)

    2011-09-06

    ... INFORMATION CONTACT: Ms. Ann Shemaka, Office of Bridge Technology, HIBT-30, (202) 366-1575, or Mr. Thomas Everett, Office of Bridge Technology, HIBT-30, (202) 366-4675, Federal Highway Administration, 1200 New... is categorized by the following material types, which are identified in the NBI: steel, concrete, pre...

  14. Prosthetic rehabilitation using adhesive bridge and fixed-fixed bridge on the maxilla and telescopic crown overdenture on mandible

    Directory of Open Access Journals (Sweden)

    Indah Sulistiawaty

    2016-12-01

    Full Text Available Prosthetic rehabilitation is the rehabilitation process of masticatory and esthetics function for patients missing teeth and alveolar bone by means of manufacture and installation of dentures. The prosthetic rehabilitation commonly used include denture adhesive bridge, fixed-fixed bridge, as well as telescopic overdenture. Adhesive bridge is bridge denture consisting of single pontic and two retainer wings attached to the abutment using cement or resin. Fixed-fixed bridge is a bridge denture with rigid connectors on both ends of the pontics, whereas the telescopic crown Overdenture is a removable denture that uses linked precision on the original tooth in the form of primary coping on abutment and secondary coping on the denture. To expose the procedures of prosthetic rehabilitation using adhesive bridge and fixed-fixed bridge on the maxilla and telescopic crown Overdenture on mandible. Male patients aged 32 years came with complaints of difficulty to chew food because he had lost some teeth behind. In the maxilla, teeth are lost in the region of 15 and 16 performed by making the fixed-fixed bridge with abutment teeth 14 and 17. Loss of teeth in the region of 26, performed the manufacture of adhesive bridge with a box preparation on the occlusal 25 and 27. In the mandible, tooth loss in the region of 36,37,46, and 47 performed manufacture of telescopic crown Overdenture with primer coping on the teeth 35.38, 45, and 48 and the secondary coping on a metal frame. Prosthetic rehabilitation especially in the case of loss of back teeth is very important because with the denture patients can chew properly and maintain the stomatognathic system.

  15. Remediation: Higher Education's Bridge to Nowhere

    Science.gov (United States)

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  16. The Principle of the Micro-Electronic Neural Bridge and a Prototype System Design.

    Science.gov (United States)

    Huang, Zong-Hao; Wang, Zhi-Gong; Lu, Xiao-Ying; Li, Wen-Yuan; Zhou, Yu-Xuan; Shen, Xiao-Yan; Zhao, Xin-Tai

    2016-01-01

    The micro-electronic neural bridge (MENB) aims to rebuild lost motor function of paralyzed humans by routing movement-related signals from the brain, around the damage part in the spinal cord, to the external effectors. This study focused on the prototype system design of the MENB, including the principle of the MENB, the neural signal detecting circuit and the functional electrical stimulation (FES) circuit design, and the spike detecting and sorting algorithm. In this study, we developed a novel improved amplitude threshold spike detecting method based on variable forward difference threshold for both training and bridging phase. The discrete wavelet transform (DWT), a new level feature coefficient selection method based on Lilliefors test, and the k-means clustering method based on Mahalanobis distance were used for spike sorting. A real-time online spike detecting and sorting algorithm based on DWT and Euclidean distance was also implemented for the bridging phase. Tested by the data sets available at Caltech, in the training phase, the average sensitivity, specificity, and clustering accuracies are 99.43%, 97.83%, and 95.45%, respectively. Validated by the three-fold cross-validation method, the average sensitivity, specificity, and classification accuracy are 99.43%, 97.70%, and 96.46%, respectively.

  17. Effects of Electrolyte on Floating Water Bridge

    Directory of Open Access Journals (Sweden)

    Hideo Nishiumi

    2009-01-01

    spontaneously. In this paper, we examined flow direction of water bridge and what effects the addition of electrolytes such as NaCl, NaOH, and NH4Cl to the floating water bridge would give. We found that ionization degree reduced the length of water bridge though insoluble electrolyte Al2O3 had no effect on the length of water bridge.

  18. LIGHT BRIDGE IN A DEVELOPING ACTIVE REGION. II. NUMERICAL SIMULATION OF FLUX EMERGENCE AND LIGHT BRIDGE FORMATION

    International Nuclear Information System (INIS)

    Toriumi, Shin; Katsukawa, Yukio; Cheung, Mark C. M.

    2015-01-01

    Light bridges, the bright structure dividing umbrae in sunspot regions, show various activity events. In Paper I, we reported on an analysis of multi-wavelength observations of a light bridge in a developing active region (AR) and concluded that the activity events are caused by magnetic reconnection driven by magnetconvective evolution. The aim of this second paper is to investigate the detailed magnetic and velocity structures and the formation mechanism of light bridges. For this purpose, we analyze numerical simulation data from a radiative magnetohydrodynamics model of an emerging AR. We find that a weakly magnetized plasma upflow in the near-surface layers of the convection zone is entrained between the emerging magnetic bundles that appear as pores at the solar surface. This convective upflow continuously transports horizontal fields to the surface layer and creates a light bridge structure. Due to the magnetic shear between the horizontal fields of the bridge and the vertical fields of the ambient pores, an elongated cusp-shaped current layer is formed above the bridge, which may be favorable for magnetic reconnection. The striking correspondence between the observational results of Paper I and the numerical results of this paper provides a consistent physical picture of light bridges. The dynamic activity phenomena occur as a natural result of the bridge formation and its convective nature, which has much in common with those of umbral dots and penumbral filaments

  19. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  20. Investigation of Aerodynamic Interference between Twin Deck Bridges

    Energy Technology Data Exchange (ETDEWEB)

    Sitek, M. A. [Argonne National Lab. (ANL), Argonne, IL (United States). Energy Systems Division. Transportation Research and Analysis Computing Center (TRACC); Bojanowski, C. [Argonne National Lab. (ANL), Argonne, IL (United States). Energy Systems Division. Transportation Research and Analysis Computing Center (TRACC); Lottes, S. A. [Argonne National Lab. (ANL), Argonne, IL (United States). Energy Systems Division. Transportation Research and Analysis Computing Center (TRACC)

    2016-05-01

    Construction of a twin bridge can be a cost effective and minimally disruptive way to increase capacity when an existing bridge is not near the end of its service life. With ever growing vehicular traffic, when demand approaches the capacity of many existing roads and bridges. Remodeling a structure with an insufficient number of lanes can be a good solution in case of smaller and less busy bridges. Closing down or reducing traffic on crossings of greater importance for the construction period, however, can result in major delays and revenue loss for commerce and transportation as well as increasing the traffic load on alternate route bridges. Multiple-deck bridges may be the answer to this issue. A parallel deck can be built next to the existing one, without reducing the flow. Additionally, a new bridge can be designed as a twin or multi-deck structure. Several such structures have been built throughout the United States, among them: - The New NY Bridge Project - the Tappan Zee Hudson River Crossing, - SR-182 Columbia River Bridge, - The Thaddeus Kosciusko Bridge (I-87), - The Allegheny River Bridge, Pennsylvania, which carries I76, - Fred Hartman Bridge, TX, see Figure 1.2. With a growing number of double deck bridges, additional, more detailed, studies on the interaction of such bridge pairs in windy conditions appears appropriate. Aerodynamic interference effects should be examined to assure the aerodynamic stability of both bridges. There are many studies on aerodynamic response of single deck bridges, but the literature on double-deck structures is not extensive. The experimental results from wind tunnels are still limited in number, as a parametric study is required, they can be very time consuming. Literature review shows that some investigation of the effects of gap-width and angle of wind incidence has been done. Most of the CFD computational studies that have been done were limited to 2D simulations. Therefore, it is desirable to investigate twin decks

  1. Review of Energy Harvesters Utilizing Bridge Vibrations

    Directory of Open Access Journals (Sweden)

    Farid Ullah Khan

    2016-01-01

    Full Text Available For health monitoring of bridges, wireless acceleration sensor nodes (WASNs are normally used. In bridge environment, several forms of energy are available for operating WASNs that include wind, solar, acoustic, and vibration energy. However, only bridge vibration has the tendency to be utilized for embedded WASNs application in bridge structures. This paper reports on the recent advancements in the area of vibration energy harvesters (VEHs utilizing bridge oscillations. The bridge vibration is narrowband (1 to 40 Hz with low acceleration levels (0.01 to 3.8 g. For utilization of bridge vibration, electromagnetic based vibration energy harvesters (EM-VEHs and piezoelectric based vibration energy harvesters (PE-VEHs have been developed. The power generation of the reported EM-VEHs is in the range from 0.7 to 1450000 μW. However, the power production by the developed PE-VEHs ranges from 0.6 to 7700 μW. The overall size of most of the bridge VEHs is quite comparable and is in mesoscale. The resonant frequencies of EM-VEHs are on the lower side (0.13 to 27 Hz in comparison to PE-VEHs (1 to 120 Hz. The power densities reported for these bridge VEHs range from 0.01 to 9539.5 μW/cm3 and are quite enough to operate most of the commercial WASNs.

  2. Electricity generation using microbial fuel cells

    Energy Technology Data Exchange (ETDEWEB)

    Mohan, Y.; Manoj Muthu Kumar, S.; Das, D. [Department of Biotechnology, Indian Institute of Technology, Kharagpur 721302 (India)

    2008-01-15

    Conversion of biomass into electricity is possible using microbial fuel cells (MFCs). The present paper deals with the studies of a two-chambered salt bridge MFC using Enterobacter cloacae IIT-BT 08 in MYG medium. The effect of different electron mediators, concentration of the mediator, ionic strength (salt concentration) of the medium and the surface area of the salt-bridge in contact with the anode and cathode chambers on the power generation in MFCs are reported. In the case of methyl viologen (MV) (0.1 mM) as the electron mediator, the voltage generation was 0.4 V but no current was detected. Different concentrations of methylene blue (MB) were also studied as the mediator. A maximum voltage of 0.37 V was seen at 0.05 mM MB, whereas a maximum current and power of 56.7{mu} A and 19.2{mu} W, respectively, were observed in the case of 0.03 mM MB with a voltage of 0.34 V. The corresponding power density and current density of 9.3mW/m{sup 2} and 27.6mA/m{sup 2}, respectively, were obtained. When the surface area of the salt bridge in contact with the anode and cathode chambers was increased, a proportionate improvement in the power output from 19.2 to 708{mu} W was detected. The maximum power density and current density of 236mW/m{sup 2} and 666.7mA/m{sup 2}, respectively, which are found to be very promising for a salt bridge MFC were observed. (author)

  3. Fatigue Testing of Dental Bridges on Selected Examples

    Directory of Open Access Journals (Sweden)

    Urban Dariusz

    2017-03-01

    Full Text Available The paper presents example tests of the functional quality of selected designs of dental bridges. These were: porcelain bridges on a metal base (cobalt based alloy, porcelain bridges on a zirconia base (zirconia ceramic – Zirkon Zahn, and full zirconia bridges (Zirkon Zahn. For the purpose of the study, durability of bridges in cyclic fatigue testing was adopted as a measure of their quality. The tests were carried out on a Zwick Roell Z010 universal testing machine. They consisted in cyclic loading and unloading of dental bridges mounted on gypsum models at a loading force of F= 400 [N] and a frequency of load of f= 1 [Hz]. Each bridge was subjected to a cycle of 7200 loads. The results show that there are no significant differences in the functional quality of the bridges.

  4. Vehicle - Bridge interaction, comparison of two computing models

    Science.gov (United States)

    Melcer, Jozef; Kuchárová, Daniela

    2017-07-01

    The paper presents the calculation of the bridge response on the effect of moving vehicle moves along the bridge with various velocities. The multi-body plane computing model of vehicle is adopted. The bridge computing models are created in two variants. One computing model represents the bridge as the Bernoulli-Euler beam with continuously distributed mass and the second one represents the bridge as the lumped mass model with 1 degrees of freedom. The mid-span bridge dynamic deflections are calculated for both computing models. The results are mutually compared and quantitative evaluated.

  5. Seismic Passive Control of Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    Hosam-Eddin M. Ali

    1995-01-01

    Full Text Available A three-dimensional modeling procedure is proposed for cable-stayed bridges with rubber, steel, and lead energy dissipation devices. The passive control technique is investigated by considering the response of bridge models with and without energy dissipation devices. The impact of various design parameters on the seismic response of current and future bridge designs is studied. Appropriate locations and properties of the passive devices can achieve better performance for cable-stayed bridges by balancing the significant reduction in earthquake-induced forces against tolerable displacements. Proper design of passive systems can help provide solutions for retro-fitting some existing bridges.

  6. Istanbul Bridge Conference 2014

    CERN Document Server

    Gülkan, Polat; Mahmoud, Khaled

    2016-01-01

      The book includes peer-reviewed contributions selected from presentations given at the Istanbul Bridge Conference 2014, held from August 11 – 13 in Istanbul, Turkey. It reports on the current challenges in bridge engineering faced by professionals around the globe, giving a special emphasis to recently developed techniques, innovations and opportunities. The book covers key topics in the field, including modeling and analysis methods; construction and erection techniques; design for extreme events and condition assessment and structural health monitoring. There is a balanced presentation of theory, research and practice. This book, which provides the readers with a comprehensive and timely reference guide on current practices in bridge engineering, is intended for professionals, academic researchers and students alike.

  7. A Polish approach to FRP bridges

    Science.gov (United States)

    Siwowski, Tomasz; Rajchel, Mateusz

    2017-12-01

    The paper presents initial results of a new approach to FRP composite bridge construction that is presently being developed and tested in Poland. The concept combines lightweight concrete with FRP composites to create a durable highly optimised structure. The paper describes the bridge system itself and presents the research results on its development. The basic design is presented together with research results on its development: FEM analysis and a range of static test results of full-scale bridge beam experiments. The paper finishes with some test results of a full scale bridge that was constructed near Rzeszow in December 2015.

  8. Virginia Bridge Information Systems Laboratory.

    Science.gov (United States)

    2014-06-01

    This report presents the results of applied data mining of legacy bridge databases, focusing on the Pontis and : National Bridge Inventory databases maintained by the Virginia Department of Transportation (VDOT). Data : analysis was performed using a...

  9. Reliability Assessment of Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Middleton, C. R.

    This paper is partly based on research performed for the Highways Agency, London, UK under the project DPU/9/44 "Revision of Bridge Assessment Rules Based on Whole Life Performance: concrete bridges". It contains the details of a methodology which can be used to generate Whole Life (WL) reliability...... profiles. These WL reliability profiles may be used to establish revised rules for concrete bridges. This paper is to some extend based on Thoft-Christensen et. al. [1996], Thoft-Christensen [1996] et. al. and Thoft-Christensen [1996]....

  10. Complex Testing of the Bridges

    Directory of Open Access Journals (Sweden)

    Savić Adrijana

    2016-01-01

    Full Text Available This article describes the process of examining bridges. AB road bridge, founded on the columns by the Karpoš system and damaged due to erosive action of the river, is given as an example. The first tests of the bridge are conducted on the impact load of V 300, because of the appearance of longitudinal cracks. The results of the columns testing are presented in this paper, as well as the rehabilitation measures thus increasing the load capacity of the column.

  11. Final Environmental Assessment, Horse Creek Bridge Replacement

    Science.gov (United States)

    2010-10-01

    existing bridge pipes that have failed and replace the failed structure with a new, prefabricated pedestrian bridge within the original bridge footprint...vehicles, nor designed for support of standard passenger vehicle loads. The bridge would be a single prefabricated unit consisting of a steel grate...placed on new concrete abutments built on the existing foundations on the creek banks, and put in place by a crane operating from the vehicle parking

  12. Stabilizer for seismically exposed bridge cranes

    International Nuclear Information System (INIS)

    Engelke, M.; Kuhr, H.

    1982-01-01

    The invention concerns a stabilizer for seismically exposed bridge cranes in reactor buildings. The trolley and the crane bridge are fitted with the stabilizer consisting of a bipartite safety catch which is connected with a joint and able to take up the vertical loads during an earthquake. This stabilizer is suitable for all kinds of bridge cranes operated in seismically active regions

  13. SURGERY OF SYMPTOMATIC MYOCARDIAL BRIDGING

    Directory of Open Access Journals (Sweden)

    N. Maghamipour N. Safaei

    2007-06-01

    Full Text Available Myocardial bridging with systolic compression of the left anterior descending coronary artery (LAD may be associated with myocardial ischemia. In symptomatic myocardial bridging unresponsive to medical treatment, surgical unroofing of the left LAD can be performed. Little information is available about the long-term prognosis of patients with this coronary anomaly after the surgical unroofing, so we decided to evaluate the result of this operation. A total of 26 patients underwent surgical unroofing of myocardial bridging. Patients had a myocardial bridge of at least 3 cm in length in the middle of LAD and with more than 70% compression during systole. Unroofing was performed with cardiopulmonary bypass in 16 and with off pump technique in 10 patients. In 6 patients repeat angiographies for control of myotomy were done. In one of them a nonsignificant 20% narrowing was seen. Postoperative scintigraphic and angiographic studies demonstrated restoration of coronary flow and myocardial perfusion without residual myocardial bridges under beta-stimulation in 24 patients. Two patients had residual narrowing. With off pump technique, 1 patient had perforation of the right ventricle and 1 patient underwent reoperation because of incomplete unroofing during the first operation. None of the patients with cardiopulmonary bypass technique had residual chest pain or other complications. Surgical unroofing of myocardial bridging with the aid of cardiopulmonary bypass is a safe and easy procedure with low operative risk and with excellent functional results.

  14. Modal analysis of cable-stayed UHPC bridge

    Directory of Open Access Journals (Sweden)

    Tej Petr

    2017-01-01

    Full Text Available This paper deals with the dynamic analysis of cable-stayed UHPC bridge over the Vltava river near town Melnik in Czech Republic, Europe. Bridge serves for pedestrians and cyclists. This work aims to familiarize the reader with dynamic calculations carried out and the results obtained, describing the dynamic properties of proposed bridge. The construction of bridge is designed as a cable-stayed structure with prestressed bridge deck consisting of prefabricated UHPC panels and reversed “V” shaped steel pylon with height of approximately 40 meters. The deck is anchored using 24 steel hangers in one row in a steel pylon - 17 ropes in the main span and 7 cables on the other side. Range of the main span is 99.18 meters and the secondary span is 31.9 m. Deck width is 4.5 meters with 3.0 meters passing space. The bridge is designed for the possibility of passage of vehicles weighting up to 3.5 tonnes. Deck panels are made of UHPC with reinforcement. At the edge of the bridge on the side of the shorter span the bridge deck is firmly connected with abutment and on the other deck it is stored using a pair of sliding bearings.

  15. Microwave Josephson generation in thin film superconducting bridges

    International Nuclear Information System (INIS)

    Gubankov, V.N.; Koshelets, V.P.; Ovsyannikov, G.A.

    1975-01-01

    Thin-film bridges have some advantage over other types of superconducting weak links: good definition of electromagnetic parameters and of weak region geometry. Up to now Josephson properties of bridges have been investigated by using indirect methods (the effect of magnetic field on the critical current I 0 , the bridge behavior in a microwave field, etc.). Direct experimental observation of Josephson radiation from autonomous thin film bridges is reported. Microwave radiation in tin bridges of 'variable' thickness has been investigated where the thickness of the film forming the bridge is far less than the thickness of the bank films. (Auth.)

  16. Progressive electricity tariffs for consumers in Germany?; Progressive Stromtarife fuer Verbraucher in Deutschland?

    Energy Technology Data Exchange (ETDEWEB)

    Tews, Kerstin [Freie Univ. Berlin (Germany). Forschungszentrum fuer Umweltpolitik

    2011-10-15

    More than a quarter of electricity use in Germany is accounted for by private households. This market segment holds vast saving potentials which are not sufficiently made use of to date. If efficiency of electricity use is to serve as a bridge to an era of a nuclear-free power supply, the political realm must find ways of addressing the existing saving potentials more effectively. One possible instrument for creating incentives to save electricity on the demand side is seen in a system of progressive tariffs. How such a system would need to be designed in order to be compatible with the regime of a liberalised electricity market has yet to be investigated however.

  17. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  18. Estimating bridge stiffness using a forced-vibration technique for timber bridge health monitoring

    Science.gov (United States)

    James P. Wacker; Xiping Wang; Brian Brashaw; Robert J. Ross

    2006-01-01

    This paper describes an effort to refine a global dynamic testing technique for evaluating the overall stiffness of timber bridge superstructures. A forced vibration method was used to measure the frequency response of several simple-span, sawn timber beam (with plank deck) bridges located in St. Louis County, Minnesota. Static load deflections were also measured to...

  19. Design aids of NU I-girders bridges.

    Science.gov (United States)

    2010-05-01

    Precast prestressed concrete I-Girder bridges have become the most dominant bridge system in the United States. In the early design : stages, preliminary design becomes a vital first step in designing an economical bridge. Within the state of Nebrask...

  20. Faster bridge construction using precast substructures : brief.

    Science.gov (United States)

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  1. BUILDING "BRIDGES" WITH QUALITY ASSURANCE

    Science.gov (United States)

    The papr describes how, rather than building "bridges" across centuries, quality assurance (QA) personnel have the opportunity to build bridges across technical disciplines, between public and private organizations, and between different QA groups. As reviewers and auditors of a...

  2. Inspection Based Evaluation of a Danish Road Bridge

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper it is shown how an inspection-based evaluation of a Danish road bridge may be performed using the BRIDGE1 and BRIDGE2 bridge management systems produced within the EC-supported research programme "Assessment of Performance and Optimal Strategies for Inspection and Maintenance...

  3. Violin Bridge Mobility Analysis under In-Plane Excitation

    Directory of Open Access Journals (Sweden)

    Cheng-Zhong Zhang

    2013-11-01

    Full Text Available The vibration of a violin bridge is a dynamic contact vibration with two interfaces: strings-bridge, and bridge feet-top plate. In this paper, the mobility of an isolated bridge under in-plane excitation is explored using finite element modeling based on the contact vibration model. Numerical results show that the dynamic contact stiffness in the two contact interfaces has a great impact on the bridge mobility. A main resonance peak is observed in the frequency range of 2–3 kHz in the frequency response of the isolated bridge when the contact stiffness is smaller than a critical threshold. The main resonance peak frequency is affected by the contact stiffness as well. In order to verify the numerical findings, a novel experimental system is then designed on the basis of a piezoelectric dynamometer for bridge mobility analysis. Experimental results confirm the impact of the dynamic contact stiffness on the bridge mobility.

  4. Violin bridge mobility analysis under in-plane excitation.

    Science.gov (United States)

    Zhang, Cheng-Zhong; Zhang, Guang-Ming; Ye, Bang-Yan; Liang, Li-Dong

    2013-11-08

    The vibration of a violin bridge is a dynamic contact vibration with two interfaces: strings-bridge, and bridge feet-top plate. In this paper, the mobility of an isolated bridge under in-plane excitation is explored using finite element modeling based on the contact vibration model. Numerical results show that the dynamic contact stiffness in the two contact interfaces has a great impact on the bridge mobility. A main resonance peak is observed in the frequency range of 2-3 kHz in the frequency response of the isolated bridge when the contact stiffness is smaller than a critical threshold. The main resonance peak frequency is affected by the contact stiffness as well. In order to verify the numerical findings, a novel experimental system is then designed on the basis of a piezoelectric dynamometer for bridge mobility analysis. Experimental results confirm the impact of the dynamic contact stiffness on the bridge mobility.

  5. Monitoring bridge scour using fiber optic sensors.

    Science.gov (United States)

    2015-04-01

    The scouring process excavates and carries away materials from the bed and banks of streams, and from : around the piers and abutments of bridges. Scour undermines bridges and may cause bridge failures due to : structural instability. In the last 30 ...

  6. Covered Bridge Security Manual

    Science.gov (United States)

    Brett Phares; Terry Wipf; Ryan Sievers; Travis Hosteng

    2013-01-01

    The design, construction, and use of covered timber bridges is all but a lost art in these days of pre-stressed concrete, high-performance steel, and the significant growth both in the volume and size of vehicles. Furthermore, many of the existing covered timber bridges are preserved only because of their status on the National Registry of Historic Places or the...

  7. Development and Field Testing of a Model to Simulate a Demonstration of Le Chatelier's Principle Using the Wheatstone Bridge Circuit.

    Science.gov (United States)

    Vickner, Edward Henry, Jr.

    An electronic simulation model was designed, constructed, and then field tested to determine student opinion of its effectiveness as an instructional aid. The model was designated as the Equilibrium System Simulator (ESS). The model was built on the principle of electrical symmetry applied to the Wheatstone bridge and was constructed from readily…

  8. Public response to bridge colors.

    Science.gov (United States)

    1973-01-01

    To determine people's reactions to bridges painted in colors as white, yellow, green, blue, red, brown, black, and aluminum, two test bridges were selected in Charlottesville, Virginia. One was painted a different color each month and the other was k...

  9. Dynamic behaviour of prestressed concrete bridges

    International Nuclear Information System (INIS)

    Javor, T.

    1982-01-01

    The paper presents the results of experimental research of dynamic effects on prestressed concrete bridges in dynamic load tests using testing vehicles. The bridges were passed over in both directions at various speeds also running over an artificial unevenness to produce impact loads. From investigated bridges are shown the dynamic quantities such as dynamic coefficients, natural frequency, logarithmical decrement of damping, etc. (orig.) [de

  10. Salt bridge as a gatekeeper against partial unfolding.

    Science.gov (United States)

    Hinzman, Mark W; Essex, Morgan E; Park, Chiwook

    2016-05-01

    Salt bridges are frequently observed in protein structures. Because the energetic contribution of salt bridges is strongly dependent on the environmental context, salt bridges are believed to contribute to the structural specificity rather than the stability. To test the role of salt bridges in enhancing structural specificity, we investigated the contribution of a salt bridge to the energetics of native-state partial unfolding in a cysteine-free version of Escherichia coli ribonuclease H (RNase H*). Thermolysin cleaves a protruding loop of RNase H(*) through transient partial unfolding under native conditions. Lys86 and Asp108 in RNase H(*) form a partially buried salt bridge that tethers the protruding loop. Investigation of the global stability of K86Q/D108N RNase H(*) showed that the salt bridge does not significantly contribute to the global stability. However, K86Q/D108N RNase H(*) is greatly more susceptible to proteolysis by thermolysin than wild-type RNase H(*) is. The free energy for partial unfolding determined by native-state proteolysis indicates that the salt bridge significantly increases the energy for partial unfolding by destabilizing the partially unfolded form. Double mutant cycles with single and double mutations of the salt bridge suggest that the partially unfolded form is destabilized due to a significant decrease in the interaction energy between Lys86 and Asp108 upon partial unfolding. This study demonstrates that, even in the case that a salt bridge does not contribute to the global stability, the salt bridge may function as a gatekeeper against partial unfolding that disturbs the optimal geometry of the salt bridge. © 2016 The Protein Society.

  11. IceBridge: Bringing a Field Campaign Home

    Science.gov (United States)

    Woods, J.; Beck, J.; Bartholow, S.

    2015-12-01

    IceBridge, a six-year NASA mission, is the largest airborne survey of Earth's polar ice ever flown. It will yield an unprecedented three-dimensional view of Arctic and Antarctic ice sheets, ice shelves and sea ice. These flights will provide a yearly, multi-instrument look at the behavior of the rapidly changing features of the Greenland and Antarctic ice. Data collected during IceBridge will help scientists bridge the gap in polar observations between NASA's Ice, Cloud and Land Elevation Satellite (ICESat) -- in orbit since 2003 -- and ICESat-2, planned for 2017. ICESat stopped collecting science data in 2009, making IceBridge critical for ensuring a continuous series of observations. IceBridge will use airborne instruments to map Arctic and Antarctic areas once a year at a minimum, with new campaigns being developed during the Arctic melt season. IceBridge flights are conducted in the spring and summer for the Arctic and in the fall over Antarctica. Other smaller airborne surveys around the world are also part of the IceBridge campaign. IceBridge actively engages the public and educators through a variety of outlets ranging from communications strategies through social media outlets, to larger organized efforts such as PolarTREC. In field activities include blog posts, photo updates, in flight chat sessions, and more intensive live events to include google hangouts, where field team members can interact with the public during a scheduled broadcast. The IceBridge team provides scientists and other team members with the training and support to become communicators in their own right. There is an exciting new initiative where IceBridge will be collaborating with Undergraduate and Graduate students to integrate the next generation of scientists and communicators into the Science Teams. This will be explored through partnerships with institutions that are interested in mentoring through project based initiatives.

  12. Bridge Deterioration Prediction Model Based On Hybrid Markov-System Dynamic

    Directory of Open Access Journals (Sweden)

    Widodo Soetjipto Jojok

    2017-01-01

    Full Text Available Instantaneous bridge failure tends to increase in Indonesia. To mitigate this condition, Indonesia’s Bridge Management System (I-BMS has been applied to continuously monitor the condition of bridges. However, I-BMS only implements visual inspection for maintenance priority of the bridge structure component instead of bridge structure system. This paper proposes a new bridge failure prediction model based on hybrid Markov-System Dynamic (MSD. System dynamic is used to represent the correlation among bridge structure components while Markov chain is used to calculate temporal probability of the bridge failure. Around 235 data of bridges in Indonesia were collected from Directorate of Bridge the Ministry of Public Works and Housing for calculating transition probability of the model. To validate the model, a medium span concrete bridge was used as a case study. The result shows that the proposed model can accurately predict the bridge condition. Besides predicting the probability of the bridge failure, this model can also be used as an early warning system for bridge monitoring activity.

  13. Quantum Bidding in Bridge

    Science.gov (United States)

    Muhammad, Sadiq; Tavakoli, Armin; Kurant, Maciej; Pawłowski, Marcin; Żukowski, Marek; Bourennane, Mohamed

    2014-04-01

    Quantum methods allow us to reduce communication complexity of some computational tasks, with several separated partners, beyond classical constraints. Nevertheless, experimental demonstrations of this have thus far been limited to some abstract problems, far away from real-life tasks. We show here, and demonstrate experimentally, that the power of reduction of communication complexity can be harnessed to gain an advantage in a famous, immensely popular, card game—bridge. The essence of a winning strategy in bridge is efficient communication between the partners. The rules of the game allow only a specific form of communication, of very low complexity (effectively, one has strong limitations on the number of exchanged bits). Surprisingly, our quantum technique does not violate the existing rules of the game (as there is no increase in information flow). We show that our quantum bridge auction corresponds to a biased nonlocal Clauser-Horne-Shimony-Holt game, which is equivalent to a 2→1 quantum random access code. Thus, our experiment is also a realization of such protocols. However, this correspondence is not complete, which enables the bridge players to have efficient strategies regardless of the quality of their detectors.

  14. Re-Assessment of Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper two aspects of re-assessment of the reliability of concrete bridges are discussed namely modelling of the corrosion of reinforcement and updating of uncertain variables. The main reason for deterioration of concrete bridges is corrosion of the reinforcement. Therefore, modelling...

  15. Rapid replacement/construction of bridges.

    Science.gov (United States)

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  16. 33 CFR 118.80 - Lights on bascule bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on bascule bridges. 118.80 Section 118.80 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.80 Lights on bascule bridges. (a) Lift span lights. Each lift span of...

  17. Precast Pearl-Chain concrete arch bridges

    DEFF Research Database (Denmark)

    Halding, Philip Skov; Hertz, Kristian Dahl; Schmidt, Jacob Wittrup

    2015-01-01

    A Pearl-Chain Bridge is a closed-spandrel arch bridge consisting of a number of straight pre-fabricated so called Super-Light Deck elements put together in an arch shape by post-tensioning cables. Several Pearl-Chain arches can be positioned adjacent to each other by a crane to achieve a bridge...... of a desired width. On top of the arch is a filling material to level out the surface of the above road. The filling only transfers vertical loads to the arch. The geometry and material properties of Super-Light Decks are presented, and we refer to several fullscale tests of Pearl-Chain arches where...... the technology was used. We also study other important components and details in the Pearl-Chain Bridge concept and review the effects of different types of loads. A theoretical case study of a circular 30 m span Pearl-Chain Bridge is presented showing the influence of a number of parameters: The number of post...

  18. Determination of in-situ strength on selected bridge element concrete girder and slab of Nagtahan bridge using rebound hammer test

    International Nuclear Information System (INIS)

    Uy, Bernadette Betsy B.; Banaga, Renato T.

    2013-01-01

    This study examined the extent of the damage due to fire on the affected areas of the bridge structure. The need to assess the damage of the Nagtahan Bridge is very useful to provide appropriate measures in the repair or in the reinforcement of the bridge, hence will ensure its strength and integrity. The study included two (2) spans of the bridge deck/slab with specific locations of the bridge that were subjected for testing. The Rebound Hammer was used as a preliminary test in evaluating the bridge condition. Its capability is to assess the in-place uniformity of concrete, to delineate regions in a structure of poor quality or deteriorated concrete, and to estimate the in-place strength; and ultimately, for relative comparison between the different structures of the bridge. With the use of the NDT Rebound Hammer Test, the researchers were able to determine whether or not the in-situ strength of the bridge's concrete has been weakened due to fire. The DPW-Standard Specification is the government acceptable manual, containing the acceptance criteria, used as the basis for standard construction procedures in the department.(author)

  19. Structural health monitoring of an existing PC box girder bridge with distributed HCFRP sensors in a destructive test

    Science.gov (United States)

    Yang, Caiqian; Wu, Zhishen; Zhang, Yufeng

    2008-06-01

    The application of hybrid carbon fiber reinforced polymer (HCFRP) sensors was addressed to monitor the structural health of an existing prestressed concrete (PC) box girder bridge in a destructive test. The novel HCFRP sensors were fabricated with three types of carbon tows in order to realize distributed and broad-based sensing, which is characterized by long-gauge length and low cost. The HCFRP sensors were bonded on the bottom and side surfaces of the existing bridge to monitor its structural health. The gauge lengths of the sensors bonded on the bottom and side surfaces were 1.5 m and 1.0 m, respectively. The HCFRP sensors were distributed on the bridge for two purposes. One was to detect damage and monitor the structural health of the bridge, such as the initiation and propagation of new cracks, strain distribution and yielding of steel reinforcements. The other purpose was to monitor the propagation of existing cracks. The good relationship between the change in electrical resistance and load indicates that the HCFRP sensors can provide actual infrastructures with a distributed damage detection and structural health monitoring system. Corrections were made to this article on 13 May 2008. The corrected electronic version is identical to the print version.

  20. Structural health monitoring of an existing PC box girder bridge with distributed HCFRP sensors in a destructive test

    International Nuclear Information System (INIS)

    Yang Caiqian; Wu Zhishen; Zhang Yufeng

    2008-01-01

    The application of hybrid carbon fiber reinforced polymer (HCFRP) sensors was addressed to monitor the structural health of an existing prestressed concrete (PC) box girder bridge in a destructive test. The novel HCFRP sensors were fabricated with three types of carbon tows in order to realize distributed and broad-based sensing, which is characterized by long-gauge length and low cost. The HCFRP sensors were bonded on the bottom and side surfaces of the existing bridge to monitor its structural health. The gauge lengths of the sensors bonded on the bottom and side surfaces were 1.5 m and 1.0 m, respectively. The HCFRP sensors were distributed on the bridge for two purposes. One was to detect damage and monitor the structural health of the bridge, such as the initiation and propagation of new cracks, strain distribution and yielding of steel reinforcements. The other purpose was to monitor the propagation of existing cracks. The good relationship between the change in electrical resistance and load indicates that the HCFRP sensors can provide actual infrastructures with a distributed damage detection and structural health monitoring system. Corrections were made to this article on 13 May 2008. The corrected electronic version is identical to the print version

  1. Future Trends in Reliability-Based Bridge Management

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    Future bridge management systems will be based on simple stochastic models predicting the residual strength of structural elements. The current deterministic management systems are not effective in optimizing e.g. the life cycle cost of a bridge or a system of bridges. A number of important factors...

  2. Assessment of Replacement Bridge using Proof Load Test

    Science.gov (United States)

    Sundru, Saibabu

    2017-11-01

    This work begins with an overview of the condition assessment of old bridge and explained reasons for demolishing of the bridge. Briefly presented flexural analysis of two stage post-tensioned prestressed concrete girder, which will be replace the old (new bridge). Construction of I-girder and composite girder at first stage and second stage prestressing respectively is explained with figures. Assessment of the load-caring capacity of the one span of the replacement bridge with simple supports using proof load test is presented which is mandatory according to Indian standards. Weighted sand bags were used to load the bridge up to a predetermined service load with impact factor. Deflections of the I-girders of the bridge were measured at selected locations along and across the bridge span and compared with computed values. Linear response was observed during loading and unloading. Considering the load test results, theoretical estimation and criteria as stipulated in codes of practice, it can be inferred that prestressed concrete I-girder bridge span has adequate capacity to carry the loads and hence, deemed to have passed the test.

  3. Planning of Tatara Bridge. Chodai shachokyo-Tataraohashi-no keikaku gaiyo

    Energy Technology Data Exchange (ETDEWEB)

    Okukawa, A. (Honshu-Shikoku Bridge Authority, Tokyo (Japan))

    1991-12-05

    The outline of the Tatara Bridge is given to introduce the features of the entire structural system and fundamental problems concerning the construction of the huge cable stayed bridge. The central span of the bridge is 890m. The topography and geological features of the bridging point are reviewed, and social conditions such as being in a national park, safety for sailing, etc. are taken into consideration for various technological studies on the construction of the huge bridge. Bridge piers are provided in the side spans and appropriate counter weight is loaded to design a more economical bridge which is more suitable for the topography as compared with a suspension bridge. The cable stayed bridge requires no anchorage which is necessary for a suspension bridge with very little topological alteration, and an excellent result is obtained both in cost and term of construction as compared with a suspension bridge. The rigidity of the cable stayed bridge is high, and the stability of the resistance to wind of the structure is also very satisfactory. As a result, it is concluded that the bridge can be designed and constructed using currently available technologies, and a cable stayed bridge is selected in August, 1990 as the type for the Tatara Bridge. 9 figs., 1 tab.

  4. 33 CFR 118.85 - Lights on vertical lift bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  5. TMACS test procedure TP012: Panalarm software bridge

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date

  6. Running Safety of Trains under Vessel-Bridge Collision

    Directory of Open Access Journals (Sweden)

    Yongle Li

    2015-01-01

    Full Text Available To optimize the sensor placement of the health monitoring system, the dynamic behavior of the train-bridge system subjected to vessel-collision should be studied in detail firstly. This study thus focuses on the characteristics of a train-bridge system under vessel-bridge collision. The process of the vessel-bridge collision is simulated numerically with a reliable finite element model (FEM. The dynamic responses of a single car and a train crossing a cable-stayed bridge are calculated. It is shown that the collision causes significant increase of the train’s lateral acceleration, lateral wheelset force, wheel unloading rate, and derailment coefficient. The effect of the collision on the train’s vertical acceleration is much smaller. In addition, parametric studies with various train’s positions, ship tonnage, and train speed are performed. If the train is closer to the vessel-bridge collision position or the ship tonnage is larger, the train will be more dangerous. There is a relatively high probability of running danger at a low speed, resulting from longer stay of the train on the bridge. The train’s position, the ship tonnage, and the train speed must be considered when determining the most adverse conditions for the trains running on bridges under vessel-bridge collision.

  7. Fatigue test on aluminium bridges

    NARCIS (Netherlands)

    Maljaars, J.; Soetens, F.; Straalen, van IJ.J.

    2005-01-01

    Traffic bridges are subjected to variable loads and should therefore be checked on fatigue. Especially low weight materials, like aluminium, are sensitive to fatigue, because the variable load is a substantial part of the total load. This paper shows the structural design of an aluminium bridge

  8. Vulnerability of bridges to fire

    DEFF Research Database (Denmark)

    Giuliani, Luisa; Crosti, C.; Gentili, F.

    2012-01-01

    Even if recent effort in developing methodology and measures for design structures against fire and explosions has been mostly focused on buildings, bridges can also be very sensitive to those actions, as witnesses by some recent bridge accidents, which caused major economic losses and also endan...

  9. Bridge employment after early retirement: a bridge to better postretirement well-being of older adults?

    NARCIS (Netherlands)

    Dingemans, E.

    2012-01-01

    Using a retirement arrangement does not necessarily mean that people retire fulltime. The phenomenon of bridge employment, already studied in the US, becomes increasingly popular among older adults in the Netherlands. The question is to what extent bridge employment can be beneficial for well-being

  10. High Voltage Gain Dual Active Bridge Converter with an Extended Operation Range for Renewable Energy Systems

    DEFF Research Database (Denmark)

    Zhang, Zhe; Tomas Manez, Kevin; Yudi, Xiao

    2018-01-01

    Bridge (P2DAB) converter, i.e. low-voltage (LV) side parallel and high-voltage (HV) side series, is proposed to achieve high voltage gain and low current stress over switching devices and transformer windings. Given the unmodified P2DAB power stage, by regulating the phase-shift angle between......Developing bidirectional dc-dc converters has become a critical research topic and gains more and more attention in recent years due to the extensive applications of smart grids with energy storages, hybrid and electrical vehicles and dc microgrids. In this paper, a Partial Parallel Dual Active...... the paralleled active bridges, the power equations and voltage gain are then modified, and therefore the operation range can be extended effectively. The operating principles of the proposed converter and its power characteristics under various operation modes are studied, and the design constraints...

  11. A 15-meter Multi-Gigabit W-band Bidirectional Wireless Bridge in Fiber-Optic Access Networks

    DEFF Research Database (Denmark)

    Pang, Xiaodan; Vegas Olmos, Juan José; Lebedev, Alexander

    2013-01-01

    . The down-converted signal is re-modulated on to the lightwave and transmit further through the fiber-optic system. In the uplink, both up-and down-conversion are performed by electrical means. Furthermore, we investigate both passive and active wireless transmitters in this work for both downlink......We present a bidirectional wireless bridge in the W-band enabling the seamless convergence between the wireless and fiber-optic access networks. In the downlink, a 16 Gbit/s QPSK signal is photonically up-converted at the wireless transmitter and electrically down-converted at the wireless receiver...... and uplink transmissions. With an active wireless transmitter, up to 15 meters wireless transmission is successfully achieved with a BER below the 7% FEC limit in the downlink....

  12. A Novel Concrete-Based Sensor for Detection of Ice and Water on Roads and Bridges.

    Science.gov (United States)

    Tabatabai, Habib; Aljuboori, Mohammed

    2017-12-14

    Hundreds of people are killed or injured annually in the United States in accidents related to ice formation on roadways and bridge decks. In this paper, a novel embedded sensor system is proposed for the detection of black ice as well as wet, dry, and frozen pavement conditions on roads, runways, and bridges. The proposed sensor works by detecting changes in electrical resistance between two sets of stainless steel poles embedded in the concrete sensor to assess surface and near-surface conditions. A preliminary decision algorithm is developed that utilizes sensor outputs indicating resistance changes and surface temperature. The sensor consists of a 102-mm-diameter, 38-mm-high, concrete cylinder. Laboratory results indicate that the proposed sensor can effectively detect surface ice and wet conditions even in the presence of deicing chlorides and rubber residue. This sensor can further distinguish black ice from ice that may exist within concrete pores.

  13. A Simple and Universal Resistive-Bridge Sensors Interface

    Directory of Open Access Journals (Sweden)

    Sergey Y. YURISH

    2011-02-01

    Full Text Available Resistive-bridge sensors are widely used in various sensor systems. There are many sensor signal conditioners from different manufacturers for such sensing elements. However, no one existing on the modern market integrated converter for resistive bridge sensors can work with both: resistive-bridge sensing elements and resistive-to-frequency and -duty-cycle converters’ outputs. A proposed and described in the article universal interface for resistive-bridge sensing elements and bridge-output-to-frequency and/or duty cycle converters based on the designed Universal Sensors and Transducers Interface (USTI integrated. It is based on a simple, cost effective three-point measuring technique and does not require any additional active components. The USTI IC is realized in a standard CMOS technology. The active supply current at operating voltage +4.5 V and clock frequency 20 MHz is not more than 9.5 mA This paper reports experimental results with a strain gauges bridge emulator and differential pressure resistive bridge sensor SX30GD2.

  14. Prestressed concrete cable-stayed bridge; PC shachokyo `Tajiri sky bridge` no seko

    Energy Technology Data Exchange (ETDEWEB)

    Kaida, Y.; Tsujino, F. [Osaka Prefectural Government Office, Osaka (Japan); Yamamoto, T.; Hishiki, Y.; Saito, K.

    1995-01-30

    The outline on the execution of PC cable-stayed bridge `Tajiri Sky Bridge` which was built at the opposite coast of Kansai International Airport was reported. This bridge is a double-sided suspension PC cable-stayed bridge with a tower height of 93.6 m having a main beam which is 26.3 m wide, featuring H-type main tower with one side beam, a smooth main beam structure, the leg top part with a large section, etc. A large-capacity factory manufacturing type non-grout cable with a pull strength of 1,900 ton class was adopted for the diagonal bracing. The leg top part is in a massive concrete structure so that, for avoiding the crack of cement due to temperature, a low heat build-up furnace cement was adopted, the water reducing agent was used, pre-cooling and side-clamping PC steel material were adopted and moderate pre-stress was introduced. In the execution of the connection part of the main beam, for preventing the deflection fluctuation due to the change of the main beam/main tower/diagonal bracing due to temperature and vibration due to wind, the earth anchor was used to tentatively fix the extended part. During execution, the wind velocity was strong reaching 25 m/s, which did not produce any problems. 1 ref., 24 figs., 3 tabs.

  15. BRIDGES for Young Adolescents in North Dakota.

    Science.gov (United States)

    Harris, Mary McDonnell

    The BRIDGES Project was initiated to explore ways for North Dakota to provide young people with stronger bridges from childhood to adulthood. This report summarizes recommendations of the 1990-91 Governor's Task Force on Early Adolescence. The recommendations concern practical actions for the building of bridges by the following groups: (1)…

  16. Lifetime Reliability Assessment of Concrete Slab Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    A procedure for lifetime assesment of the reliability of short concrete slab bridges is presented in the paper. Corrosion of the reinforcement is the deterioration mechanism used for estimating the reliability profiles for such bridges. The importance of using sensitivity measures is stressed....... Finally the produce is illustrated on 6 existing UK bridges....

  17. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Science.gov (United States)

    2010-07-01

    ... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the... Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, in San Francisco Bay, California. (b... siren, radio, flashing light, or other means, the operator of a vessel shall proceed as directed. [COTP...

  18. Rectified tunneling current response of bio-functionalized metal-bridge-metal junctions.

    Science.gov (United States)

    Liu, Yaqing; Offenhäusser, Andreas; Mayer, Dirk

    2010-01-15

    Biomolecular bridged nanostructures allow direct electrical addressing of electroactive biomolecules, which is of interest for the development of bioelectronic and biosensing hybrid junctions. In the present paper, the electroactive biomolecule microperoxidase-11 (MP-11) was integrated into metal-bridge-metal (MBM) junctions assembled from a scanning tunneling microscope (STM) setup. Before immobilization of MP-11, the Au working electrode was first modified by a self-assembled monolayer of 1-undecanethiol (UDT). A symmetric and potential independent response of current-bias voltage (I(t)/V(b)) was observed for the Au (substrate)/UDT/Au (tip) junction. However, the I(t)/V(b) characteristics became potential dependent and asymmetrical after binding of MP-11 between the electrodes of the junction. The rectification ratio of the asymmetric current response varies with gate electrode modulation. A resonant tunneling process between metal electrode and MP-11 enhances the tunneling current and is responsible for the observed rectification. Our investigations demonstrated that functional building blocks of proteins can be reassembled into new conceptual devices with operation modes deviating from their native function, which could prove highly useful in the design of future biosensors and bioelectronic devices. Copyright 2009 Elsevier B.V. All rights reserved.

  19. Wind tunnel test of musi VI bridge

    Science.gov (United States)

    Permata, Robby; Andika, Matza Gusto; Syariefatunnisa, Risdhiawan, Eri; Hermawan, Budi; Noordiana, Indra

    2017-11-01

    Musi VI Bridge is planned to cross the Musi River in Palembang City, South Sumatera Province, Indonesia. The main span is a steel arch type with 200 m length and side span length is 75 m. Finite element analysis results showed that the bridge has frequency ratio for torsional and heaving mode (torsional frequency/heaving frequency)=1.14. This close to unity value rises concern about aerodynamic behaviour and stability of the bridge deck under wind loading. Sectional static and free vibration wind tunnel test were performed to clarify this phenomena in B2TA3 facility in Serpong, Indonesia. The test followed the draft of Guide of Wind Tunnel Test for Bridges developed by Indonesian Ministry of Public Works. Results from wind tunnel testing show that the bridge is safe from flutter instability and no coupled motion vibration observed. Therefore, low value of frequency ratio has no effect to aerodynamic behaviour of the bridge deck. Vortex-induced vibration in heaving mode occurred in relatively low wind velocity with permissible maximum amplitude value.

  20. Methanol, Ethanol and Propanol in EHD liquid bridging

    International Nuclear Information System (INIS)

    Fuchs, Elmar C; Wexler, Adam D; Agostinho, Luewton L F; Ramek, Michael; Woisetschläger, Jakob

    2011-01-01

    When a high-voltage direct-current is applied to two beakers filled with water or polar liquid dielectrica, a horizontal bridge forms between the two beakers. In this work such bridges made of methanol, ethanol, 1-propanol and 2-propanol are investigated with polarimetry and thermography. Whereas methanol, ethanol and 1-propanol bridges become warm like a water bridge, a 2-propanol bridge cools down relative to the surroundings. It is shown how the different stability of the primary and secondary alcoholate ions and the resulting small difference in conductivity between 1-propanol and 2-propanol is responsible for this novel effect.

  1. The shape, stability and breakage of pendant liquid bridges

    Science.gov (United States)

    Padday, J. F.; Pétré, G.; Rusu, C. G.; Gamero, J.; Wozniak, G.

    1997-12-01

    Pendant liquid bridges are defined as pendant drops supporting a solid axisymmetric endplate at their lower end. The stability and shape properties of such bridges are defined in terms of the capillary properties of the system and of the mass and radius of the lower free-floating endplate. The forces acting in the pendant liquid bridge are defined exactly and expressed in dimensionless form. Numerical analysis has been used to derive the properties of a given bridge and it is shown that as the bridge grows by adding more liquid to the system a maximum volume is reached. At this maximum volume, the pendant bridge becomes unstable with the length of the bridge increasing spontaneously and irreversibly at constant volume. Finally the bridge breaks with the formation of a satellite drop or an extended thread. The bifurcation and breakage processes have been recorded using a high-speed video camera with a digital recording rate of up to 6000 frames per second. The details of the shape of the bridge bifurcation and breakage for many pendant bridge systems have been recorded and it is shown that satellite drop formation after rupture is not always viscosity dependent. Bifurcation and breakage in simulated low gravity demonstrated that breakage was very nearly symmetrical about a plane through the middle of the pendant bridge.

  2. Seismic response computations for a long span bridge

    International Nuclear Information System (INIS)

    McCallen, D.B.

    1994-01-01

    The authors are performing large-scale numerical computations to simulate the earthquake response of a major long-span bridge that crosses the San Francisco Bay. The overall objective of the study is to estimate the response of the bridge to potential large-magnitude earthquakes generated on the nearby San Andreas and Hayward earthquake faults. Generation of a realistic model of the bridge system is complicated by the existence of large pile group foundations that extend deep into soft, saturated clay soils, and by the numerous expansion joints that segment the overall bridge structure. In the current study, advanced, nonlinear, finite element technology is being applied to rigorously model the detailed behavior of the bridge system and to shed light on the influence of the foundations and joints of the bridge

  3. Shear evaluation of tapered bridge girder panels with steel corrugated webs near the supports of continuous bridges

    OpenAIRE

    Zevallos, E.; Hassanein, M.F.; Real Saladrigas, Esther; Mirambell Arrizabalaga, Enrique

    2016-01-01

    Because of public construction budgets were cut over the last few years, new bridge girders with corrugated webs to reduce the construction costs have become more widely studied and used. In spite that tapered bridge girders with corrugated webs (BGCWs) are used in modern bridges, their shear strength and behaviour rarely exists in literature. Based on available literature, the web of the linearly tapered BGCWs may be divided into three typologies with different structural response to shear f...

  4. Blasting detonators incorporating semiconductor bridge technology

    Energy Technology Data Exchange (ETDEWEB)

    Bickes, R.W. Jr.

    1994-05-01

    The enormity of the coal mine and extraction industries in Russia and the obvious need in both Russia and the US for cost savings and enhanced safety in those industries suggests that joint studies and research would be of mutual benefit. The author suggests that mine sites and well platforms in Russia offer an excellent opportunity for the testing of Sandia`s precise time-delay semiconductor bridge detonators, with the potential for commercialization of the detonators for Russian and other world markets by both US and Russian companies. Sandia`s semiconductor bridge is generating interest among the blasting, mining and perforation industries. The semiconductor bridge is approximately 100 microns long, 380 microns wide and 2 microns thick. The input energy required for semiconductor bridge ignition is one-tenth the energy required for conventional bridgewire devices. Because semiconductor bridge processing is compatible with other microcircuit processing, timing and logic circuits can be incorporated onto the chip with the bridge. These circuits can provide for the precise timing demanded for cast effecting blasting. Indeed tests by Martin Marietta and computer studies by Sandia have shown that such precise timing provides for more uniform rock fragmentation, less fly rock, reduce4d ground shock, fewer ground contaminants and less dust. Cost studies have revealed that the use of precisely timed semiconductor bridges can provide a savings of $200,000 per site per year. In addition to Russia`s vast mineral resources, the Russian Mining Institute outside Moscow has had significant programs in rock fragmentation for many years. He anticipated that collaborative studies by the Institute and Sandia`s modellers would be a valuable resource for field studies.

  5. 0-6722 : spread prestressed concrete slab beam bridges.

    Science.gov (United States)

    2014-08-01

    The Texas Department of Transportation uses : precast prestressed concrete slab beam bridges for : shorter-span bridges of approximately 3050 ft in : length. Conventional slab beam bridges have slab : beams placed immediately adjacent to one anoth...

  6. Building Bridges One Line at a Time

    Science.gov (United States)

    Grigsby, Cathy Murray

    2012-01-01

    In this article, first-grade students were taught the different kinds of lines that were part of the construction of various bridges--the curved lines of the arches of stone bridges, straight lines connecting the cables of a suspension bridge, vertical lines, horizontal lines, and so on. They gained practice in drawing structures and in fine brush…

  7. SURVEY RESULTS AND TESTING OF RAILWAY BRIDGES

    Directory of Open Access Journals (Sweden)

    I. H. Haniiev

    2010-03-01

    Full Text Available The article is devoted to the survey and testing of railway bridges by the State Joint-Stock Railway Company «Uzbekiston Temir Yollari» («Uzbekistan Railways». It is stated that in the existing rules on determination of the capacity of bridges the recommendations on taking into account the cumulative deflection to the moment of technical diagnostics of spans on the bridge capacity are absent. The author states on the need to develop a method for determining the wear of spans on restriction of the residual deflection in the bridge floor slabs.

  8. 23 CFR 650.705 - Application for discretionary bridge funds.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  9. Performance Deterioration of Heavy-Haul Railway Bridges under Fatigue Loading Monitored by a Multisensor System

    Directory of Open Access Journals (Sweden)

    Zhiwu Yu

    2018-01-01

    Full Text Available Heavy-haul railway bridges play an increasingly essential role in the transportation in China due to the increasing transport volume. The performance deterioration of the scale models of a typical heavy-haul railway bridge under fatigue loading is monitored in this work, based on a multisensor system including the fiber-reinforced polymer optical fiber Bragg grating and electrical resistance strain gauges, linear variable displacement transducer, and accelerometer. Specifically, by monitoring/observing on the failure mode, fatigue life, load-midspan deflection response, material strain development, and so forth, this work develops an S-N model by comparing the relationship between fatigue life and rebar stress range with that between fatigue life and load level and proposes a damage evolution model considering the coupling of the stiffness degradation and inelastic deformation of specimens. It is found that the fatigue life of specimens is determined by the fatigue life of the rebar at the bottom and it may be lower than 2.0 million cycles with a 30-ton axle weight when environmental factors are taken into account. The predictions of the models agree well with experimental results. Therefore, this work furthers the understanding of the fatigue performance deterioration of the bridges by using a multisensor system.

  10. New conceptual design of portable bamboo bridge for emergency purposes

    Science.gov (United States)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  11. Assessment of a nanoparticle bridge platform for molecular electronics measurements

    International Nuclear Information System (INIS)

    Jafri, S H M; Blom, T; Leifer, K; Stroemme, M; Welch, K; Loefaas, H; Grigoriev, A; Ahuja, R

    2010-01-01

    A combination of electron beam lithography, photolithography and focused ion beam milling was used to create a nanogap platform, which was bridged by gold nanoparticles in order to make electrical measurements and assess the platform under ambient conditions. Non-functionalized electrodes were tested to determine the intrinsic response of the platform and it was found that creating devices in ambient conditions requires careful cleaning and awareness of the contributions contaminants may make to measurements. The platform was then used to make measurements on octanethiol (OT) and biphenyldithiol (BPDT) molecules by functionalizing the nanoelectrodes with the molecules prior to bridging the nanogap with nanoparticles. Measurements on OT show that it is possible to make measurements on relatively small numbers of molecules, but that a large variation in response can be expected when one of the metal-molecule junctions is physisorbed, which was partially explained by attachment of OT molecules to different sites on the surface of the Au electrode using a density functional theory calculation. On the other hand, when dealing with BPDT, high yields for device creation are very difficult to achieve under ambient conditions. Significant hysteresis in the I-V curves of BPDT was also observed, which was attributed primarily to voltage induced changes at the interface between the molecule and the metal.

  12. A cloud-based information repository for bridge monitoring applications

    Science.gov (United States)

    Jeong, Seongwoon; Zhang, Yilan; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.

    2016-04-01

    This paper describes an information repository to support bridge monitoring applications on a cloud computing platform. Bridge monitoring, with instrumentation of sensors in particular, collects significant amount of data. In addition to sensor data, a wide variety of information such as bridge geometry, analysis model and sensor description need to be stored. Data management plays an important role to facilitate data utilization and data sharing. While bridge information modeling (BrIM) technologies and standards have been proposed and they provide a means to enable integration and facilitate interoperability, current BrIM standards support mostly the information about bridge geometry. In this study, we extend the BrIM schema to include analysis models and sensor information. Specifically, using the OpenBrIM standards as the base, we draw on CSI Bridge, a commercial software widely used for bridge analysis and design, and SensorML, a standard schema for sensor definition, to define the data entities necessary for bridge monitoring applications. NoSQL database systems are employed for data repository. Cloud service infrastructure is deployed to enhance scalability, flexibility and accessibility of the data management system. The data model and systems are tested using the bridge model and the sensor data collected at the Telegraph Road Bridge, Monroe, Michigan.

  13. The I-35W bridge Project Website

    DEFF Research Database (Denmark)

    Kampf, Constance

    How can websites be used to rebuild trust?  In August 2007, the Interstate Highway 35-W bridge in Minneapolis, MN collapsed during rush hour.  Although many people were rescued and casualties were as limited as could be expected due to quick and effective intervention, the image of a major bridge...... collapsing during rush hour damaged the Minnesota Department of Transportation's reputation and resulted in the loss of public trust for the organization.  The ensuing bridge reconstruction project included a project website intended to rebuild this trust through transparency, community involvement......, and the use of multimodal features.  This paper looks at the I35-W bridge reconstruction project in Minneapolis through web-based communication by the Minnesota Department of Transportation (MnDOT) about the project. The MnDOT bridge reconstruction website will be examined using a combination of 1). Weick...

  14. Investigation on the performance of bridge approach slab

    Directory of Open Access Journals (Sweden)

    Abdelrahman Amr

    2018-01-01

    Full Text Available In Egypt, where highway bridges are to be constructed on soft cohesive soils, the bridge abutments are usually founded on rigid piles, whereas the earth embankments for the bridge approaches are directly founded on the natural soft ground. Consequently, excessive differential settlement frequently occurs between the bridge deck and the bridge approaches resulting in a “bump” at both ends of the bridge deck. Such a bump not only creates a rough and uncomfortable ride but also represents a hazardous condition to traffic. One effective technique to cope with the bump problem is to use a reinforced concrete approach slab to provide a smooth grade transition between the bridge deck and the approach pavement. Investigating the geotechnical and structural performance of approach slabs and revealing the fundamental affecting factors have become mandatory. In this paper, a 2-D finite element model is employed to investigate the performance of approach slabs. Moreover, an extensive parametric study is carried out to appraise the relatively optimum geometries of approach slab, i.e. slab length, thickness, embedded depth and slope, that can yield permissible bumps. Different geo-mechanical conditions of the cohesive foundation soil and the fill material of the bridge embankment are examined.

  15. History of cable-stayed bridges

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1999-01-01

    The principle of supporting a bridge deck by inclined tension members leading to towers on either side of the span has been known for centuries. However, the real development of cable-stayed bridges did not begin before the 1950s. Since then the free span has been increased from 183 m in the Strö...

  16. A Hierarchical Analysis of Bridge Decision Makers ... The Role of New Technology Adoption in the Timber Bridge Market: Special Project

    Science.gov (United States)

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1995-01-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...

  17. Intercellular bridges in vertebrate gastrulation.

    Directory of Open Access Journals (Sweden)

    Luca Caneparo

    Full Text Available The developing zebrafish embryo has been the subject of many studies of regional patterning, stereotypical cell movements and changes in cell shape. To better study the morphological features of cells during gastrulation, we generated mosaic embryos expressing membrane attached Dendra2 to highlight cellular boundaries. We find that intercellular bridges join a significant fraction of epiblast cells in the zebrafish embryo, reaching several cell diameters in length and spanning across different regions of the developing embryos. These intercellular bridges are distinct from the cellular protrusions previously reported as extending from hypoblast cells (1-2 cellular diameters in length or epiblast cells (which were shorter. Most of the intercellular bridges were formed at pre-gastrula stages by the daughters of a dividing cell maintaining a membrane tether as they move apart after mitosis. These intercellular bridges persist during gastrulation and can mediate the transfer of proteins between distant cells. These findings reveal a surprising feature of the cellular landscape in zebrafish embryos and open new possibilities for cell-cell communication during gastrulation, with implications for modeling, cellular mechanics, and morphogenetic signaling.

  18. Characterization of bridge foundations workshop report.

    Science.gov (United States)

    2013-11-01

    "In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge foundations. To narrow the focus and develop a research roadmap for the program, a workshop on Characterization of Bridge Foundations...

  19. An efficient CMOS bridging fault simulator with SPICE accuracy

    NARCIS (Netherlands)

    Di, C.; Jess, J.A.G.

    1996-01-01

    This paper presents an alternative modeling and simulation method for CMOS bridging faults. The significance of the method is the introduction of a set of generic-bridge tables which characterize the bridged outputs for each bridge and a set of generic-cell tables which characterize how each cell

  20. 33 CFR 118.110 - Daymarks and lateral lighting on bridges.

    Science.gov (United States)

    2010-07-01

    ... bridges. 118.110 Section 118.110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.110 Daymarks and lateral lighting on bridges. (a... through bridges with U.S. aids to navigation system lateral marks and lights installed on the...

  1. Some aspects of technical models within bridge management system

    Directory of Open Access Journals (Sweden)

    Grković Slobodan

    2015-01-01

    Full Text Available Bridge Management System (BMS represents a rational and systematic approach to organizing and conducting of all activities related to bridge maintenance. Main goal of BMS is helping the bridge owner to make an optimal decision with respect to bridge maintenance budget, whether it is dedicated to one bridge or to group of bridges, by securing that the decision is made on the basis of Life-Cycle Cost (LCC estimates. The structure of BMS is based on condition rating and Bridge Database (BD, Deterioration model (DM, Cost Model for evaluation of costs and Optimization Model for choosing the most rational maintenance strategy. Relationship between bridge condition rating and DM with maintenance costs within BMS is very important. Predictions regarding future intensity and rate of bridge deterioration depends on multitude of factors and it is a consequence of several simultaneous actions and deterioration processes (DP which need to be included into DMs. DMs are mostly based on modeling of physical and chemical actions and processes or they are based on statistical analysis of large number of data regarding the condition of existing bridges, or on artificial intelligence models, etc. Stochastic models based on Markov processes are applied within more advanced contemporary BMS. Due to social and economic circumstances and lack of financial resources over the last two decades in Republic of Serbia bridge maintenance was neglected and creation of BD was discontinued. The paper deliberates some aspects of technical models within BMS, with DMs being pointed out, development of BD within bridge maintenance in Republic of Serbia and it gives an overview of sophisticated BMS and current advances in this field.

  2. Monitoring system of arch bridge for safety network management

    Science.gov (United States)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  3. A Comparison of Limb-Socket Kinematics of Bone-Bridging and Non-Bone-Bridging Wartime Transtibial Amputations

    Science.gov (United States)

    2012-05-16

    each successive loading interval. Subset analysis was performed on the basis of amputation type (bone bridging or non bone bridging) and suspension...fitting, patient care. Washington, DC: US Government Printing Office; 1969. 2. Ertl J. Uber amputationsstumpfe. Chirurg. 1949;20:218 24. 3. Pinto MA

  4. Suspension Bridge Flutter for Girder with Separate Control Flaps

    DEFF Research Database (Denmark)

    Huynh, T.; Thoft-Christensen, Palle

    Active vibration control of long span suspension bridge flutter using separated control flaps (SFSC) has shown to increase effectively the critical wind speed of bridges. In this paper, an SFSC calculation based on modal equations of the vertical and torsional motions of the bridge girder including...... the flaps is presented. The length of the flaps attached to the girder, the flap configuration and the flap rotational angles are parameters used to increase the critical wind speed of the bridge. To illustrate the theory a numerical example is shown for a suspension bridge of 1000m+2500m+1000m span based...... on the Great Belt Bridge streamlined girder....

  5. Two high-frequency mutual inductance bridges with high resolution

    NARCIS (Netherlands)

    Flokstra, Jakob; Gerritsma, G.J.; Kreuwel, H.J.M.; van der Marel, L.C.

    1980-01-01

    Two mutual inductance bridges are described for operation up to about 100 kHz. Special attention is paid to the sensitivity and resolution of the bridges. Both bridges can be used to measure variations of about 10 pH in the mutual inductance. The first bridge consists of passive elements only

  6. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Bridges not requiring a USCG permit. 650.805 Section 650... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... permit is not required for bridge construction. This determination shall be made at an early stage of...

  7. Using rotating liquid bridges as accelerometers

    Energy Technology Data Exchange (ETDEWEB)

    Montanero, J.M. [Universidad de Extremadura, Badajoz (Spain). Dept. de Electronica e Ingenieria Electromecanica; Cabezas, G.; Acero, J.; Zayas, F.

    1999-07-01

    Liquid bridges have recently been proposed as fluid accelerometers that could be used to measure very small inertial forces under microgravity conditions [Meseguer et al., microgravity sci. technol. IX/2 (1996)]. The essential idea is to infer the values of such inertial forces from the liquid bridge interface contour, whose shape obviously depends on the values of such forces (apart from the bridge volume and the geometry of the supporting disks). Following a similar procedure, in this paper we explore the use of rotating axisymmetric liquid bridges to measure the residual axial gravity and the rotation rate of the liquid bridge regarded as a solid body. In light off the difficulties involved in performing experiments on Earth, the role of empirical data is played by an accurate numerical solution of the Young-Laplace equation. The values of both the axial gravity and angular speed are obtained by fitting the approximate analytical expressions derived in this paper to the numerical solution of the Young-Laplace equation. The comparison between the predicted and actual values of the variables of interest shows a satisfactory agreement, supporting the suitability of the procedure. (orig.)

  8. Advanced materials for control of post-earthquake damage in bridges

    International Nuclear Information System (INIS)

    Shrestha, Kshitij C; Saiidi, M Saiid; Cruz, Carlos A

    2015-01-01

    This paper presents analytical modeling to study the seismic response of bridge systems with conventional and advanced details. For validation, a 33 m quarter-scale model of a four-span bridge incorporating innovative materials and details seismically tested on the shake tables at the University of Nevada, Reno was taken. The bridge specimen involved use of advanced materials and details to reduce damage at plastic hinges and minimize residual displacements. A three-dimensional, nonlinear model incorporating the response of the innovative materials was developed to study the bridge response using the finite-element software OpenSees. Existing finite-element formulations were used to capture the response of the advanced materials used in the bridge. The analytical model was found to be able to reproduce comparable bent displacements and bent shear forces within reasonable accuracy. The validated model was further used to study different types of bridges under suite of scaled bi-directional near-fault ground motions. Comparisons were made on behavior of five different bridge types, first conventional reinforced concrete bridge, second post-tensioned column bridge, third bridge with elastomeric rubber elements at the plastic hinge zone, fourth bridge with nickel–titanium superelastic shape memory alloy (SMA) reinforcing bar and fifth bridge with CuAlMn superelastic SMA reinforcing bar. Both the SMA used bridges also utilized engineered cementitious composite element at the plastic hinge zone. The results showed effectiveness of the innovative interventions on the bridges in providing excellent recentering capabilities with minimal damage to the columns. (paper)

  9. Building Bridges

    DEFF Research Database (Denmark)

    The report Building Bridges adresses the questions why, how and for whom academic audience research has public value, from the different points of view of the four working groups in the COST Action IS0906 Transforming Audiences, Transforming Societies – “New Media Genres, Media Literacy and Trust...... in the Media”, “Audience Interactivity and Participation”, “The Role of Media and ICT Use for Evolving Social Relationships” and “Audience Transformations and Social Integration”. Building Bridges is the result of an ongoing dialogue between the Action and non-academic stakeholders in the field of audience......, Brian O’Neill, Andra Siibak, Sascha Trültzsch-Wijnen, Nicoletta Vittadini, Igor Vobič and Frauke Zeller. Stakeholder feedback from: Michelle Arlotta (DeAgostini), Andreea M. Costache (Association of Consumers of Audiovisual Media in Catalonia/TAC), Francesco Diasio (AMARC Europe), Marius Dragomir (Open...

  10. Mathematical bridges

    CERN Document Server

    Andreescu, Titu; Tetiva, Marian

    2017-01-01

    Building bridges between classical results and contemporary nonstandard problems, Mathematical Bridges embraces important topics in analysis and algebra from a problem-solving perspective. Blending old and new techniques, tactics and strategies used in solving challenging mathematical problems, readers will discover numerous genuine mathematical gems throughout that will heighten their appreciation of the inherent beauty of mathematics. Most of the problems are original to the authors and are intertwined in a well-motivated exposition driven by representative examples. The book is structured to assist the reader in formulating and proving conjectures, as well as devising solutions to important mathematical problems by making connections between various concepts and ideas from different areas of mathematics. Instructors and educators teaching problem-solving courses or organizing mathematics clubs, as well as motivated mathematics students from high school juniors to college seniors, will find Mathematical Bri...

  11. Free energy landscape of a minimalist salt bridge model.

    Science.gov (United States)

    Li, Xubin; Lv, Chao; Corbett, Karen M; Zheng, Lianqing; Wu, Dongsheng; Yang, Wei

    2016-01-01

    Salt bridges are essential to protein stability and dynamics. Despite the importance, there has been scarce of detailed discussion on how salt bridge partners interact with each other in distinct solvent exposed environments. In this study, employing a recent generalized orthogonal space tempering (gOST) method, we enabled efficient molecular dynamics simulation of repetitive breaking and reforming of salt bridge structures within a minimalist salt-bridge model, the Asp-Arg dipeptide and thereby were able to map its detailed free energy landscape in aqueous solution. Free energy surface analysis shows that although individually-solvated states are more favorable, salt-bridge states still occupy a noticeable portion of the overall population. Notably, the competing forces, e.g. intercharge attractions that drive the formation of salt bridges and solvation forces that pull the charged groups away from each other, are energetically comparable. As the result, the salt bridge stability is highly tunable by local environments; for instance when local water molecules are perturbed to interact more strongly with each other, the population of the salt-bridge states is likely to increase. Our results reveal the critical role of local solvent structures in modulating salt-bridge partner interactions and imply the importance of water fluctuations on conformational dynamics that involves solvent accessible salt bridge formations. © 2015 The Protein Society.

  12. A Novel Concrete-Based Sensor for Detection of Ice and Water on Roads and Bridges

    Directory of Open Access Journals (Sweden)

    Habib Tabatabai

    2017-12-01

    Full Text Available Hundreds of people are killed or injured annually in the United States in accidents related to ice formation on roadways and bridge decks. In this paper, a novel embedded sensor system is proposed for the detection of black ice as well as wet, dry, and frozen pavement conditions on roads, runways, and bridges. The proposed sensor works by detecting changes in electrical resistance between two sets of stainless steel poles embedded in the concrete sensor to assess surface and near-surface conditions. A preliminary decision algorithm is developed that utilizes sensor outputs indicating resistance changes and surface temperature. The sensor consists of a 102-mm-diameter, 38-mm-high, concrete cylinder. Laboratory results indicate that the proposed sensor can effectively detect surface ice and wet conditions even in the presence of deicing chlorides and rubber residue. This sensor can further distinguish black ice from ice that may exist within concrete pores.

  13. STUDY OF BRIDGE DECK A REVIEW

    OpenAIRE

    MISS. KSHITIJA S. BALWAN , MR. V. G. KHURD , MR. S. S. CHOUGULE

    2018-01-01

    The objective of this study was to understand the meaning of bridge deck. To know the different forms of decks used in bridge design. To understand different methods used for analysis of deck and study of box girder and its evolution

  14. Strategic Planning for the National Bridge Stock of Iran

    Directory of Open Access Journals (Sweden)

    Ali Sahrapeyma

    2013-06-01

    Full Text Available The National Bridge Stock of Iran consists of about 330,000 bridges, of which around 50% are older than 30 years. Since 2010, Iran Road Maintenance & Transportation Organization has started implementing a comprehensive Bridge Management System in order to manage this aged stock efficiently. To predict future conditions of bridge stock, a heuristic numerical method is presented. This methodology is based on Markovian process to model deterioration of bridge decks and a multi-objective optimization problem to find the best solutions. The optimization problem involves three decision variables regarding management strategies, and has three objectives regarding cost minimization. Constraints of the problem are the percentage of deficient bridges, the percentage of bridges under MR&Rs (Maintenance, Repair and Rehabilitation and the average value of condition scores. The results show that to avoid future challenges, the annual budget for bridge maintenance should be increased, the current maintenance strategy should be improved as soon as possible, and national manuals and instructions for inspection, condition rating and maintenance should be developed.

  15. Foot force models of crowd dynamics on a wobbly bridge.

    Science.gov (United States)

    Belykh, Igor; Jeter, Russell; Belykh, Vladimir

    2017-11-01

    Modern pedestrian and suspension bridges are designed using industry standard packages, yet disastrous resonant vibrations are observed, necessitating multimillion dollar repairs. Recent examples include pedestrian-induced vibrations during the opening of the Solférino Bridge in Paris in 1999 and the increased bouncing of the Squibb Park Bridge in Brooklyn in 2014. The most prominent example of an unstable lively bridge is the London Millennium Bridge, which started wobbling as a result of pedestrian-bridge interactions. Pedestrian phase locking due to footstep phase adjustment is suspected to be the main cause of its large lateral vibrations; however, its role in the initiation of wobbling was debated. We develop foot force models of pedestrians' response to bridge motion and detailed, yet analytically tractable, models of crowd phase locking. We use biomechanically inspired models of crowd lateral movement to investigate to what degree pedestrian synchrony must be present for a bridge to wobble significantly and what is a critical crowd size. Our results can be used as a safety guideline for designing pedestrian bridges or limiting the maximum occupancy of an existing bridge. The pedestrian models can be used as "crash test dummies" when numerically probing a specific bridge design. This is particularly important because the U.S. code for designing pedestrian bridges does not contain explicit guidelines that account for the collective pedestrian behavior.

  16. Hierarchical analysis of bridge decision makers : the role of new technology adoption in the timber bridge market : special project fiscal year 1992

    Science.gov (United States)

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...

  17. Application of bridging-law concepts to short-fibre composites

    DEFF Research Database (Denmark)

    Lindhagen, J.E.; Gamstedt, Kristofer; Berglund, L.A.

    2000-01-01

    This is the third paper in a series of four where notch sensitivity, fracture energy and bridging laws are studied in short-fibre polymer composites. Here, bridging laws are derived from experimental crack-opening profiles in centre-hole notched tensile specimens. The materials studied are three...... types of commercial glass-mat composites with different reinforcement structures and matrices. The materials have softening bridging laws and the calculated fracture energies from bridging laws are in good agreement with values determined directly by experiment. The calculated maximum local bridging...

  18. GaggleBridge: collaborative data analysis.

    Science.gov (United States)

    Battke, Florian; Symons, Stephan; Herbig, Alexander; Nieselt, Kay

    2011-09-15

    Tools aiding in collaborative data analysis are becoming ever more important as researchers work together over long distances. We present an extension to the Gaggle framework, which has been widely adopted as a tool to enable data exchange between different analysis programs on one computer. Our program, GaggleBridge, transparently extends this functionality to allow data exchange between Gaggle users at different geographic locations using network communication. GaggleBridge can automatically set up SSH tunnels to traverse firewalls while adding some security features to the Gaggle communication. GaggleBridge is available as open-source software implemented in the Java language at http://it.inf.uni-tuebingen.de/gb. florian.battke@uni-tuebingen.de Supplementary data are available at Bioinformatics online.

  19. Seismic Performance of Multi-Span RC Railway Bridges

    DEFF Research Database (Denmark)

    Georgakis, Christos; Barrau, Xavier

    2008-01-01

    Presently, there is no clear method for determining the optimal railway bridge design for a particular ground type and expected seismic intensity. Four main types of RC bridge dominate the current multi-span railway bridge design trends – the Simply Supported Beam, Continuous Box-Girder (CBG), CBG...

  20. Durability of Materials in Pearl-Chain Bridges

    DEFF Research Database (Denmark)

    Lund, Mia Schou Møller

    . The construction of the Pearl-Chain arch is simple. The arch is assembled on its side, next to the road that the bridge will span, by placing a number of plane prefabricated Super-Light Decks that consist of lightweight aggregate concrete and conventional concrete, in the desired arch shape. Mortar joints are cast...... is stabilized by casting a fill material between the spandrel walls of the arch. Finally, the road surface is cast on top of the fill material. New bridges are designed for a service lifetime of at least 100 years. Hence, the specifications of the materials used in Pearl-Chain Bridges are high. This PhD study...... and pervious concrete were also investigated. The most suitable fill material for Pearl-Chain Bridges depends on the particular bridge design; the results obtained and presented in the present PhD study provide guidance on how to decide which fill material is most suitable regarding strength, permeability...

  1. Chapter 10:Hardwoods for timber bridges

    Science.gov (United States)

    James P. Wacker; Ed T. Cesa

    2005-01-01

    This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  2. Identifying hidden sexual bridging communities in Chicago.

    Science.gov (United States)

    Youm, Yoosik; Mackesy-Amiti, Mary Ellen; Williams, Chyvette T; Ouellet, Lawrence J

    2009-07-01

    Bridge populations can play a central role in the spread of human immunodeficiency virus (HIV) by providing transmission links between higher and lower prevalence populations. While social network methods are well suited to the study of bridge populations, analyses tend to focus on dyads (i.e., risk between drug and/or sex partners) and ignore bridges between distinct subpopulations. This study takes initial steps toward moving the analysis of sexual network linkages beyond individual and risk group levels to a community level in which Chicago's 77 community areas are examined as subpopulations for the purpose of identifying potential bridging communities. Of particular interest are "hidden" bridging communities; that is, areas with above-average levels of sexual ties with other areas but whose below-average AIDS prevalence may hide their potential importance for HIV prevention. Data for this analysis came from the first wave of recruiting at the Chicago Sexual Acquisition and Transmission of HIV Cooperative Agreement Program site. Between August 2005 through October 2006, respondent-driven sampling was used to recruit users of heroin, cocaine, or methamphetamine, men who have sex with men regardless of drug use, the sex partners of these two groups, and sex partners of the sex partners. In this cross-sectional study of the sexual transmission of HIV, participants completed a network-focused computer-assisted self-administered interview, which included questions about the geographic locations of sexual contacts with up to six recent partners. Bridging scores for each area were determined using a matrix representing Chicago's 77 community areas and were assessed using two measures: non-redundant ties and flow betweenness. Bridging measures and acquired immunodeficiency syndrome (AIDS) case prevalence rates were plotted for each community area on charts representing four conditions: below-average bridging and AIDS prevalence, below-average bridging and above

  3. Aesthetic coatings for concrete bridge components

    Science.gov (United States)

    Kriha, Brent R.

    This thesis evaluated the durability and aesthetic performance of coating systems for utilization in concrete bridge applications. The principle objectives of this thesis were: 1) Identify aesthetic coating systems appropriate for concrete bridge applications; 2) Evaluate the performance of the selected systems through a laboratory testing regimen; 3) Develop guidelines for coating selection, surface preparation, and application. A series of site visits to various bridges throughout the State of Wisconsin provided insight into the performance of common coating systems and allowed problematic structural details to be identified. To aid in the selection of appropriate coating systems, questionnaires were distributed to coating manufacturers, bridge contractors, and various DOT offices to identify high performing coating systems and best practices for surface preparation and application. These efforts supplemented a literature review investigating recent publications related to formulation, selection, surface preparation, application, and performance evaluation of coating materials.

  4. 1,2-bridged quadricyclanes

    International Nuclear Information System (INIS)

    Hart, H.; Cheng-Tai Peng

    1982-01-01

    The readily available benzodihydropentalene 6 and dimethyl acetylenedicarboxylate react to give norbornadiene diester 8, with a three-carbon bridge from C 1 to C 2 . Irradiation of 8 gives the corresponding C 1 -C 2 bridged quadricyclane diester 9, a new ring system. Diester 9 is quite stable, reverting to 8 with a tsub(1/2) of 30 min at 170 0 C. The corresponding diacid 11, also prepared, reverts to its norbornadiene precursor at a considerably lower temperature, possibly as a consequence of acid catalysis. (author)

  5. Influence of Icing on Bridge Cable Aerodynamics

    DEFF Research Database (Denmark)

    Koss, Holger; Frej Henningsen, Jesper; Olsen, Idar

    2013-01-01

    In recent years the relevance of ice accretion for wind-induced vibration of structural bridge cables has been recognised and became a subject of research in bridge engineering. Full-scale monitoring and observation indicate that light precipitation at moderate low temperatures between zero and -5......°C may lead to large amplitude vibrations of bridge cables under wind action. For the prediction of aerodynamic instability quasi-steady models have been developed estimating the cable response magnitude based on structural properties and aerodynamic force coefficients for drag, lift and torsion...... forces of different bridge cables types. The experiments were conducted in a wind tunnel facility capable amongst others to simulate incloud icing conditions....

  6. Ambient Response Analysis of the Great Belt Bridge

    DEFF Research Database (Denmark)

    Brincker, Rune; Frandsen, Jeanette B.; Andersen, Palle

    2000-01-01

    In this paper an ambient response analysis of the Great Belt Bridge is presented. The Great Belt Bridge is one of the largest suspension bridges in the world, and the analysis was carried out in order to investigate the possibilities of estimating reliable damping values from the ambient response...

  7. Ways of ensuring the standard of bridge superstructures.

    OpenAIRE

    M.G. Malgin; V.I. Kiryan

    2011-01-01

    The structural features of welded railway bridges of the last century were considered. The basic causes of appearance of fatigue cracks in welded joints of railway bridges were assessed. Structural and technological ways of provision of the design life of operated and new-built welded railway bridges are discussed.

  8. Bridge monitoring by interferometric deformation sensors

    Science.gov (United States)

    Inaudi, Daniele; Vurpillot, Samuel; Casanova, Nicoletta

    1996-09-01

    In many concrete bridges, the deformations are the most relevant parameter to be monitored in both short and long- terms. Strain monitoring gives only local information about the material behavior and too many such sensors would therefore be necessary to gain a complete understanding of the bridge behavior. We have found that fiber optic deformation sensors, with measurement bases of the order of one to a few meters, can give useful information both during the first days after concrete pouring and in the long term. In a first phase it is possible to monitor the thermal expansion due to the exothermic setting reaction and successively the thermal and drying shrinkages. Thanks to the long sensor basis, the detection of a crack traverse to the measurement region becomes probable and the evolution of cracks can therefore be followed with a reduced number of sensors. In the long-term it is possible to measure the geometric deformations and therefore the creeping of the bridge under static loads, especially under its own weight. In the past two years, our laboratory has installed hundreds of fiber optic deformation sensors in more than five concrete, composite steel-concrete, refurbished and enlarged bridges (road, highway and railway bridges). The measuring technique relies on low-coherence interferometry and offers a resolution down to a few microns even for long-term measurements. This contribution briefly discusses the measurement technique and then focuses on the development of a reliable sensor for direct concrete embedding and on the experimental results obtained on these bridges.

  9. Guanidinium-Induced Denaturation by Breaking of Salt Bridges.

    Science.gov (United States)

    Meuzelaar, Heleen; Panman, Matthijs R; Woutersen, Sander

    2015-12-07

    Despite its wide use as a denaturant, the mechanism by which guanidinium (Gdm(+) ) induces protein unfolding remains largely unclear. Herein, we show evidence that Gdm(+) can induce denaturation by disrupting salt bridges that stabilize the folded conformation. We study the Gdm(+) -induced denaturation of a series of peptides containing Arg/Glu and Lys/Glu salt bridges that either stabilize or destabilize the folded conformation. The peptides containing stabilizing salt bridges are found to be denatured much more efficiently by Gdm(+) than the peptides containing destabilizing salt bridges. Complementary 2D-infrared measurements suggest a denaturation mechanism in which Gdm(+) binds to side-chain carboxylate groups involved in salt bridges. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  10. Bridging Redox Species-Coated Graphene Oxide Sheets to Electrode for Extending Battery Life Using Nanocomposite Electrolyte.

    Science.gov (United States)

    Huang, Yi Fu; Ruan, Wen Hong; Lin, Dong Ling; Zhang, Ming Qiu

    2017-01-11

    Substituting conventional electrolyte for redox electrolyte has provided a new intriguing method for extending battery life. The efficiency of utilizing the contained redox species (RS) in the redox electrolyte can benefit from increasing the specific surface area of battery electrodes from the electrode side of the electrode-electrolyte interface, but is not limited to that. Herein, a new strategy using nanocomposite electrolyte is proposed to enlarge the interface with the aid of nanoinclusions from the electrolyte side. To do this, graphene oxide (GO) sheets are first dispersed in the electrolyte solution of tungstosilicic salt/lithium sulfate/poly(vinyl alcohol) (SiWLi/Li 2 SO 4 /PVA), and then the sheets are bridged to electrode, after casting and evaporating the solution on the electrode surface. By applying in situ conductive atomic force microscopy and Raman spectra, it is confirmed that the GO sheets doped with RS of SiWLi/Li 2 SO 4 can be bridged and electrically reduced as an extended electrode-electrolyte interface. As a result, the RS-coated GO sheets bridged to LiTi 2 (PO 4 ) 3 //LiMn 2 O 4 battery electrodes are found to deliver extra energy capacity (∼30 mAh/g) with excellent electrochemical cycling stability, which successfully extends the battery life by over 50%.

  11. Measurements of bridges' vibration characteristics using a mobile phone

    Directory of Open Access Journals (Sweden)

    Z. M. C. Pravia

    Full Text Available ABSTRACTThis research presents an alternative way to perform a bridge inspection, which considers the dynamics parameters from the structure. It shows an experimental phase with use of a mobile phone to extract the accelerations answers from two concrete bridges, from those records is feasible to obtain natural frequencies using the Fast Fourier Transform (FFT.Numerical models with uses finite element model (FEM allow to determine the natural frequencies from the two concrete bridges and compare with the experimental phase of each one. The final results shows it's possible to use mobiles phones to extract vibration answers from concrete bridges and define the structural behavior of bridges from natural frequencies, this procedure could be used to evaluate bridges with lower costs.

  12. Gust loading on streamlined bridge decks

    DEFF Research Database (Denmark)

    Larose, Guy; Mann, Jakob

    1998-01-01

    The current analytical description of the buffeting action of wind on long-span bridges is based on the strip assumption. However, recent experiments on closed-box girder bridge decks have shown that this assumption is not valid and is the source of an important part of the error margin...... of the analytical prediction methods. In this paper, an analytical model that departs from the strip assumption is used to describe the gust loading on a thin airfoil. A parallel is drawn between the analytical model and direct measurements of gust loading on motionless closed-box girder bridge decks. Empirical...

  13. Resin-Bonded Bridges in vitro and in vivo

    NARCIS (Netherlands)

    Veen, Johannes Hilbrandt van der

    1988-01-01

    In this thesis in vitro and in vivo studies on the clinical application of resin-bonded bridges are described and discussed. The development of different types of resin-bonded bridges is described in chapter 1. The bridges are often made by boding a cast metal retainer fitted with and artificial

  14. Performance indicators for roadway bridges

    OpenAIRE

    Strauss, A.; Vidovic, A.; Zambon, I.; Dengg, F.; Tanasic, N.; Matos, José C.

    2016-01-01

    Publicado em "Maintenance, monitoring, safety, risk and resilience of bridges and bridge networks". ISBN 978-1-138-02851-7 The performance indicators should, by its definition, allow capturing the life-cycle degradation processes affecting maintenance plans or the remaining lifetime. The qualitative or quantitative performance indicators are obtained through visual inspections, non-destructive tests or monitoring systems. After their quantification and the comparison with the resp...

  15. Nanocrystalline Axially Bridged Iron Phthalocyanine Polymeric Conductor: (μ-Thiocyanato(phthalocyaninatoiron(III

    Directory of Open Access Journals (Sweden)

    Eiza Shimizu

    2016-01-01

    Full Text Available Skewered Iron(III phthalocyanine conducting polymer can be constructed with the utilization of axial thiocyanato ligands ((μ-thiocyanato(phthalocyaninatoiron(III; (FeIII(Pc(SCNn thereby creating additional avenues for electron transport through a linear SCN bridge, apart from the intermolecular π-π orbital overlap between the Pc molecules. In this paper, we report on the conversion of bulk FeIII(Pc(SCNn polymeric organic conductor into crystalline nanostructures through horizontal vapor phase growth process. The needle-like nanostructures are deemed to provide more ordered and, thus, more π-π interactive interskewer FeIII(Pc(SCNn polymer orientation, resulting in a twofold increase of its electrical conductivity per materials density unit.

  16. Probabilistic and sensitivity analysis of Botlek Bridge structures

    Directory of Open Access Journals (Sweden)

    Králik Juraj

    2017-01-01

    Full Text Available This paper deals with the probabilistic and sensitivity analysis of the largest movable lift bridge of the world. The bridge system consists of six reinforced concrete pylons and two steel decks 4000 tons weight each connected through ropes with counterweights. The paper focuses the probabilistic and sensitivity analysis as the base of dynamic study in design process of the bridge. The results had a high importance for practical application and design of the bridge. The model and resistance uncertainties were taken into account in LHS simulation method.

  17. Shaking Table Tests of Curved Bridge considering Bearing Friction Sliding Isolation

    Directory of Open Access Journals (Sweden)

    Lei Yan

    2016-01-01

    Full Text Available Specific to severe damage to curved bridges in earthquakes caused by the excessive force of the fixed bearings and piers, a new seismic design method on curved bridges considering bearing friction sliding isolation is proposed in this paper. Seismic model bridge and isolation model bridge with similarity ratio of 1/20 were made and the shaking table comparison test was conducted. The experimental results show that the isolation model curved bridge suffered less seismic damage than the seismic model curved bridge. The fundamental frequencies of the seismic model bridge and isolation model bridge decreased and the damping ratio increased with the increase of seismic intensity. Compared with seismic curved bridge, the maximum reduction rates of peak acceleration along the radial and tangential directions on the top of pier of the isolation model curved bridge were 47.3% and 55.5%, respectively, and the maximum reduction rate of the peak strain on the bottom of pier of the isolation model curved bridge was 43.4%. For the isolation model curved bridge, the maximum reduction rate of peak acceleration on the top of pier was 24.6% compared with that on the bottom of pier. The study results can provide experimental basis for the seismic design of curved bridges.

  18. Neighborhood Bridges: 2010-2011 Evaluation Report

    Science.gov (United States)

    Ingram, Debra

    2011-01-01

    In 2010-2011, students in twenty-five classrooms from eleven schools in the Minneapolis-Saint Paul metropolitan area participated in The Children's Theatre Company's Neighborhood Bridges (Bridges) program. The Children's Theatre Company contracted with the University of Minnesota's Center for Applied Research and Educational Improvement (CAREI) to…

  19. Ways of ensuring the standard of bridge superstructures.

    Directory of Open Access Journals (Sweden)

    M.G. Malgin

    2011-12-01

    Full Text Available The structural features of welded railway bridges of the last century were considered. The basic causes of appearance of fatigue cracks in welded joints of railway bridges were assessed. Structural and technological ways of provision of the design life of operated and new-built welded railway bridges are discussed.

  20. Longest cable-stayed bridge TATARA; Longest shachokyo Tatara Ohashi

    Energy Technology Data Exchange (ETDEWEB)

    Fujii, K. [Hiroshima University, Hiroshima (Japan). Faculty of Engineering

    1998-06-15

    The world`s longest cable-stayed bridge Tatara having a central span of 890 m had the both ends closed in August 1997, linking Namakuchi Island and Omishima Island. Final finishing work is continuing for opening of the West Seto Expressway in the spring of 1999. A cable-stayed bridge supports the bridge girders by perpendicular components of tensile force of cables stayed obliquely. On the other hand, there is a concern that the girders may have axial compression force generated due to horizontal components of the force from the cable tensile force, which can cause buckling of the girders. Therefore, in order to suspend the girders efficiently by increasing the perpendicular components of the cable force, and moreover to suppress the axial compression force on the girders, it is more advantageous to make bridge towers high, hence the towers of this bridge are highest among the bridges on the Shimanami Ocean Road. This bridge whose long girders are stayed with 21-stage multi cables presented a problem in designing the buckling in steel girders near the towers due to the horizontal components of the force generated by the bridge. Discussions were given, therefore, by using load withstanding force experiments using a whole bridge model of 1/50 scale, buckling experiments on full-size reinforcing plate models, and load withstanding force analysis using a tower model. A number of other technical discussions were repeated, by which the world`s longest cable-stayed bridge was completed. 9 figs., 1 tab.

  1. Noise Considerations in Resistance Bridges

    DEFF Research Database (Denmark)

    Diamond, Joseph M.

    1963-01-01

    A signal-to-noise analysis is made of the Wheatstone bridge, where the unknown and standard resistors may be at different temperatures, a situation which occurs in resistance thermometry. The limiting condition is assumed to be dissipation in the unknown resistor. It is shown that the ratio arms...... thermometry, where the noise in the unknown resistor will predominate strongly. An impedance step-up device (transformer or tuned circuit) is valuable in raising the bridge signal and noise level above the noise of the first amplifier tube. However, as the step-up ratio is increased, two counterfactors appear....... With certain assumptions about the noise and grid current of the first tube it is found that the equivalent temperature of a unity ratio (Mueller) bridge used for liquid helium measurements may be 400°K....

  2. T-section glulam timber bridge modules : modeling and performance

    Science.gov (United States)

    Paul A. Morgan; Steven E. Taylor; Michael A. Ritter; John M. Franklin

    1999-01-01

    This paper describes the design, modeling, and testing of two portable timber bridges, each consisting of two noninterconnected longitudinal glued-laminated timber (glulam) deck panels 1.8 m (6 ft) wide. One bridge is 12.2 m (40 ft) long while the other bridge is 10.7 m (35 ft) long. The deck panels are fabricated in a unique double-tee cross section. The bridges...

  3. Effects of Irregular Bridge Columns and Feasibility of Seismic Regularity

    Science.gov (United States)

    Thomas, Abey E.

    2018-05-01

    Bridges with unequal column height is one of the main irregularities in bridge design particularly while negotiating steep valleys, making the bridges vulnerable to seismic action. The desirable behaviour of bridge columns towards seismic loading is that, they should perform in a regular fashion, i.e. the capacity of each column should be utilized evenly. But, this type of behaviour is often missing when the column heights are unequal along the length of the bridge, allowing short columns to bear the maximum lateral load. In the present study, the effects of unequal column height on the global seismic performance of bridges are studied using pushover analysis. Codes such as CalTrans (Engineering service center, earthquake engineering branch, 2013) and EC-8 (EN 1998-2: design of structures for earthquake resistance. Part 2: bridges, European Committee for Standardization, Brussels, 2005) suggests seismic regularity criterion for achieving regular seismic performance level at all the bridge columns. The feasibility of adopting these seismic regularity criterions along with those mentioned in literatures will be assessed for bridges designed as per the Indian Standards in the present study.

  4. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  5. Sensing and Rating of Vehicle–Railroad Bridge Collision

    DEFF Research Database (Denmark)

    Vemuganti, Shreya; Ozdagli, Ali I.; Liu, Bideng

    2017-01-01

    Overhead collisions of trucks with low-clearance railway bridges cause more than half of the railway traffic interruptions over bridges in the United States. Railroad owners are required to characterize the damage caused by such events and assess the safety of subsequent train crossings. However...... and remotely quantify damage. This research proposes an impact rating strategy based on the information that best describes the consequences of vehicle-railway bridge collisions. A series of representative impacts were simulated using numerical finite element models of a steel railway bridge. Railway owners...... provided information about the bridge and impact characterization based on railway industry experience. The resulting nonlinear dynamic responses were evaluated with the proposed rating strategy to assess the effect of these impacts. In addition, a neural network methodology was implemented on a simplified...

  6. Bridge Creek IMW database - Bridge Creek Restoration and Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The incised and degraded habitat of Bridge Creek is thought to be limiting a population of ESA-listed steelhead (Oncorhynchus mykiss). A logical restoration approach...

  7. A fiber bridging model for fatigue delamination in composite materials

    International Nuclear Information System (INIS)

    Gregory, Jeremy R.; Spearing, S. Mark

    2004-01-01

    A fiber bridging model has been created to examine the effects of bridging on Mode I delamination fatigue fracture in a carbon fiber polymer-matrix composite. The model uses a cohesive zone law that is derived from quasi-static R-curves to determine the bridging energy applied in the bridged region. Timoshenko beam theory and an iterative self-consistent scheme are used to calculate the bridging tractions and displacements. After applying the bridging model to crack propagation data the scatter in the data was significantly reduced and clear trends were observed as a function of temperature that were not apparent previously. This indicated that the model appropriately accounted for the bridging in the experiments. Scanning electron microscopy crack opening displacement measurements were performed to validate the model's predictions. The measurements showed that the predictions were close to the actual bridging levels in the specimen

  8. Transmission investment and expansion planning in a restructured electricity market

    International Nuclear Information System (INIS)

    Wu, F.F; Wen, F.S.; Zheng, F.L.

    2006-01-01

    Transmission planning in a restructured electricity market becomes increasingly complicated. To bridge the gap between economic and engineering considerations, this survey paper suggests a framework to clarify the interactions among various economic and engineering issues by reviewing recent theoretical and practical progress in transmission investment and transmission planning methodology. Thus, the paper makes economic literature more accessible to the engineering community and engineering literature more accessible to the economic community interested in the subject. (author)

  9. Magnetic fluid bridge in a non-uniform magnetic field

    International Nuclear Information System (INIS)

    Pelevina, D.A.; Naletova, V.A.; Turkov, V.A.

    2017-01-01

    The shape of a magnetic fluid bridge between a horizontal ferrite rod of circular cross-section and a horizontal plate above the rod in a vertical applied uniform magnetic field is studied. Various static shapes of the bridges are obtained theoretically and experimentally for the same magnetic field value. Abrupt changes and the hysteresis of the bridge shape in alternating magnetic fields are observed experimentally. - Highlights: • Magnetic fluid bridge between rod and horizontal plate in magnetic field is studied. • Magnetic field is created by a ferrite rod in a uniform vertical magnetic field. • Various static bridge shapes for fixed field are obtained in theory and experiment. • A good agreement of experimental and theoretical results is obtained. • Hysteresis of the bridge shape in alternating field is observed experimentally.

  10. Magnetic fluid bridge in a non-uniform magnetic field

    Energy Technology Data Exchange (ETDEWEB)

    Pelevina, D.A., E-mail: pelevina.daria@gmail.com; Naletova, V.A.; Turkov, V.A.

    2017-06-01

    The shape of a magnetic fluid bridge between a horizontal ferrite rod of circular cross-section and a horizontal plate above the rod in a vertical applied uniform magnetic field is studied. Various static shapes of the bridges are obtained theoretically and experimentally for the same magnetic field value. Abrupt changes and the hysteresis of the bridge shape in alternating magnetic fields are observed experimentally. - Highlights: • Magnetic fluid bridge between rod and horizontal plate in magnetic field is studied. • Magnetic field is created by a ferrite rod in a uniform vertical magnetic field. • Various static bridge shapes for fixed field are obtained in theory and experiment. • A good agreement of experimental and theoretical results is obtained. • Hysteresis of the bridge shape in alternating field is observed experimentally.

  11. Evaluating the life cycle environmental impact of short span bridges

    DEFF Research Database (Denmark)

    Du, Guangli; Pettersson, Lars; Karoumi, Raid

    2016-01-01

    impact of the construction sector. Life cycle assessment (LCA) is a systematic method for assessing the environmental impact of products and systems, but its application in bridges is scarce. In Swede, most of the bridges are short spans and the type of concrete slab-frame bridge (CFB) accounts...... for a large share. Soil steel composite bridge (SSCB) is a functional equivalent solution for CFB. In order to mitigate the environmental burdens of short span bridges, this paper performed a comparative LCA study between these two types of bridge. The results indicate that the initial material consumption...

  12. A study on carbon nanotube bridge as a electromechanical memory device

    Science.gov (United States)

    Kang, Jeong Won; Ha Lee, Jun; Joo Lee, Hoong; Hwang, Ho Jung

    2005-04-01

    A nanoelectromechanical (NEM) nanotube random access memory (NRAM) device based on carbon nanotube (CNT) was investigated using atomistic simulations. For the CNT-based NEM memory, the mechanical properties of the CNT-bridge and van der Waals interactions between the CNT-bridge and substrate were very important. The critical amplitude of the CNT-bridge was 16% of the length of the CNT-bridge. As molecular dynamics time increased, the CNT-bridge went to the steady state under the electrostatic force with the damping of the potential and the kinetic energies of the CNT-bridge. The interatomic interaction between the CNT-bridge and substrate, value of the CNT-bridge slack, and damping rate of the CNT-bridge were very important for the operation of the NEM memory device as a nonvolatile memory.

  13. Tin Whisker Electrical Short Circuit Characteristics. Part 2

    Science.gov (United States)

    Courey, Karim J.; Asfour, Shihab S.; Onar, Arzu; Bayliss, Jon A.; Ludwig, Lawrence L.; Wright, Maria C.

    2009-01-01

    Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that has an unknown probability associated with it. Note however that due to contact resistance electrical shorts may not occur at lower voltage levels. In our first article we developed an empirical probability model for tin whisker shorting. In this paper, we develop a more comprehensive empirical model using a refined experiment with a larger sample size, in which we studied the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From the resulting data we estimated the probability distribution of an electrical short, as a function of voltage. In addition, the unexpected polycrystalline structure seen in the focused ion beam (FIB) cross section in the first experiment was confirmed in this experiment using transmission electron microscopy (TEM). The FIB was also used to cross section two card guides to facilitate the measurement of the grain size of each card guide's tin plating to determine its finish.

  14. Self-Aligned Growth of Organic Semiconductor Single Crystals by Electric Field.

    Science.gov (United States)

    Kotsuki, Kenji; Obata, Seiji; Saiki, Koichiro

    2016-01-19

    We proposed a novel but facile method for growing organic semiconductor single-crystals via solvent vapor annealing (SVA) under electric field. In the conventional SVA growth process, nuclei of crystals appeared anywhere on the substrate and their crystallographic axes were randomly distributed. We applied electric field during the SVA growth of 2,7-dioctyl[1]benzothieno[3,2-b][1]benzothiophene (C8-BTBT) on the SiO2/Si substrate on which a pair of electrodes had been deposited beforehand. Real-time observation of the SVA process revealed that rodlike single crystals grew with their long axes parallel to the electric field and bridged the prepatterned electrodes. As a result, C8-BTBT crystals automatically formed a field effect transistor (FET) structure and the mobility reached 1.9 cm(2)/(V s). Electric-field-assisted SVA proved a promising method for constructing high-mobility single-crystal FETs at the desired position by a low-cost solution process.

  15. BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges

    Science.gov (United States)

    Dang, N. S.; Shim, C. S.

    2018-04-01

    Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.

  16. Myocardial bridges of the coronary arteries in the human fetal heart.

    Science.gov (United States)

    Cakmak, Yusuf Ozgür; Cavdar, Safiye; Yalin, Aymelek; Yener, Nuran; Ozdogmus, Omer

    2010-09-01

    During the last century, many investigators reported on myocardial bridges in the adult human heart. In the present study, 39 human fetal hearts (the mean gestastional age was 30 weeks) were studied for myocardial bridging, and the results were correlated with adult data. Among the 39 (27 male and 12 female) fetal hearts studied, 26 bridges were observed on 18 fetal hearts (46.2%). Ten of the bridges had one myocardial bridge, whereas double myocardial bridges were observed in eight fetal hearts. The most frequent myocardial bridges were observed on the left anterior descending artery (LAD), which had 13 bridges (50%). Eight (30.7%) myocardial bridges were on the diagonal artery, and on the posterior descending artery there were five (19.3%). Myocardial bridges were not observed on the circumflex artery. The data presented in this study may provide potentially useful information for the preoperative evaluation of the newborn and may have a clinical implication for sudden fetal death.

  17. Overview of the National Timber Bridge Inspection Study

    Science.gov (United States)

    James P. Wacker; Brian K. Brashaw; Frank Jalinoos

    2013-01-01

    As many engineers begin to implement life cycle cost analyses within the preliminary bridge design phase, there is a significant need for more reliable data on the expected service life of highway bridges. Many claims are being made about the expected longevity of concrete and steel bridges, but few are based on actual performance data. Because engineers are least...

  18. Collapse of the Tacoma· N arrows Bridge

    Indian Academy of Sciences (India)

    something was noticeably wrong with the bridge. The span ... So spectacular was the motion at times that the bridge was soon nicknamed Galloping. Gertie, and visitors ... A stranded car can be seen on the top right corner. ... home from Cal Tech a small rubber model of the bridge which one of my mechanics had made for ...

  19. An expert system for the esthetic rating of bridges.

    Science.gov (United States)

    1990-01-01

    The expert system presented should facilitate the in-depth analysis of bridge esthetics and encourage high standards for the appearance of bridges. The procedure described systematically evaluates features of a target bridge in relation to a similar ...

  20. Implementation of sustainability in bridge design, construction and maintenance.

    Science.gov (United States)

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  1. “On a bridge in Berlin”

    DEFF Research Database (Denmark)

    Pihl, Ole Verner

    2013-01-01

    This is a self-reflective case study based on the development of the Graphic Novel: “On a bridge in Berlin.” The GN will be used as an introduction to the history of architecture as a part of the curriculum in Architecture and Design at Aalborg University, and as a more broadly introduction...... that jumps in time and place: it begins with Martin Heidegger´s quotation “The Bridge gathers to itself in its own way earth and sky, divinities and mortals”, and the bridge is a state of mind, a chronotope, a portal in time between past, present, and future. The methodological approach is based...

  2. Noise measurements on proximity effect bridges

    International Nuclear Information System (INIS)

    Decker, S.K.; Mercereau, J.E.

    1975-01-01

    Audio frequency noise density measurements were performed on weakly superconducting proximity effect bridges on using a cooled transformer and room temperature low noise preamplifier. The noise temperature of the measuring system is approximately 4 0 K for a 0.9 Ω resistor. Noise density was measured as a function of bias current and temperature for the bridges. Excess noise above that expected from Johnson noise for a resistor equal to the dynamic resistance of the bridges was observed in the region near the critical current of the device. At high currents compared to the critical current, the noise density closely approaches that given by Johnson noise

  3. Heavy Vehicles on Minor Highway Bridges

    DEFF Research Database (Denmark)

    Kirkegaard, Poul Henning; Nielsen, Søren R. K.; Enevoldsen, I.

    of heavier trucks moving at larger speeds, and partly because the authorities want to permit transportation of special heavy goods at a larger part of the road net. These needs will in many cases cause the strengthening of the bridges becomes necessary. In order to keep the expenses of such strengthening...... the results obtained using the numerical models given in details in "Heavy Vehicles on Minor Highway Bridges : dynamic modelling of vehicles and bridges". The models are established using a ordinary vehicle which consists of a 48 t Scania with a 3 axle tractor and a 3 axle trailer, joined in a flexible hinge...

  4. Super-bridges suspended over carbon nanotube cables

    Science.gov (United States)

    Carpinteri, Alberto; Pugno, Nicola M.

    2008-11-01

    In this paper the new concept of 'super-bridges', i.e. kilometre-long bridges suspended over carbon nanotube cables, is introduced. The analysis shows that the use of realistic (thus defective) carbon nanotube bundles as suspension cables can enlarge the current limit main span by a factor of ~3. Too large compliance and dynamic self-excited resonances could be avoided by additional strands, rendering the super-bridge anchored as a spider's cobweb. As an example, we have computed the limit main spans of the current existing 19 suspended-deck bridges longer than 1 km assuming them to have substituted their cables with carbon nanotube bundles (thus maintaining the same geometry, with the exception of the length) finding spans of up to ~6.3 km. We thus suggest that the design of the Messina bridge in Italy, which would require a main span of ~3.3 km, could benefit from the use of carbon nanotube bundles. We believe that their use represents a feasible and economically convenient solution. The plausibility of these affirmations is confirmed by a statistical analysis of the existing 100 longest suspended bridges, which follow a Zipf's law with an exponent of 1.1615: we have found a Moore-like (i.e. exponential) law, in which the doubling of the capacity (here the main span) per year is substituted by the factor 1.0138. Such a law predicts that the realization of the Messina bridge using conventional materials will only occur around the middle of the present century, whereas it could be expected in the near future if carbon nanotube bundles were used. A simple cost analysis concludes the paper.

  5. Super-bridges suspended over carbon nanotube cables

    International Nuclear Information System (INIS)

    Carpinteri, Alberto; Pugno, Nicola M

    2008-01-01

    In this paper the new concept of 'super-bridges', i.e. kilometre-long bridges suspended over carbon nanotube cables, is introduced. The analysis shows that the use of realistic (thus defective) carbon nanotube bundles as suspension cables can enlarge the current limit main span by a factor of ∼3. Too large compliance and dynamic self-excited resonances could be avoided by additional strands, rendering the super-bridge anchored as a spider's cobweb. As an example, we have computed the limit main spans of the current existing 19 suspended-deck bridges longer than 1 km assuming them to have substituted their cables with carbon nanotube bundles (thus maintaining the same geometry, with the exception of the length) finding spans of up to ∼6.3 km. We thus suggest that the design of the Messina bridge in Italy, which would require a main span of ∼3.3 km, could benefit from the use of carbon nanotube bundles. We believe that their use represents a feasible and economically convenient solution. The plausibility of these affirmations is confirmed by a statistical analysis of the existing 100 longest suspended bridges, which follow a Zipf's law with an exponent of 1.1615: we have found a Moore-like (i.e. exponential) law, in which the doubling of the capacity (here the main span) per year is substituted by the factor 1.0138. Such a law predicts that the realization of the Messina bridge using conventional materials will only occur around the middle of the present century, whereas it could be expected in the near future if carbon nanotube bundles were used. A simple cost analysis concludes the paper.

  6. Long-term behavior of integral abutment bridges : [technical summary].

    Science.gov (United States)

    2011-01-01

    Integral abutment bridges, a type of jointless bridge, are the construction option of choice when designing highway bridges in many parts of the country. Rather than providing an expansion joint to separate the substructure from the superstructure to...

  7. Simple model of cable-stayed bridge deck subjected to static wind loading

    Science.gov (United States)

    Kang, Yi-Lung; Wang, Yang Cheng

    1997-05-01

    Cable-stayed bridges have been known since 18th century with aesthetics design. The structural system and the structural behavior are significantly different from those of continuous bridges. Compared to continuous bridge, cable- stayed bridges have more flexure bridge deck than those of continuous bridges.On the other hand, cable-stayed bridges have less stiffness to resist wind loading especially for lateral loads. The first considering of bridge engineering is safety. In 1940's, Tacoma Narrows Suspension Bridge destroyed by wind loading is a good example even though it is not a cable-stayed bridge. After the bridge was destroyed, a lot of research articles have been published regarding cable supported bridge subjected to wind loading. In recent days, high strength materials have been served. The bridge engineers use the advantages to expand the span length of cable-stayed bridges. Due to the span length increased and the use of high strength materials, cable- stayed bridges have more significant nonlinear behavior subjected to wind loading. In this paper, a slice bridge deck of cable-stayed bridge connected to internal support cables is considered. The deck has been considered to be subjected to lateral static wind loading. Since cables can not take compressive force, the deck has strongly nonlinear behavior even though the materials are linear elastic. Several primary load combinations have ben considered in this paper such as the bridge deck supposed to be moved horizontally without rotation or the bridge deck supposed to be moved horizontally with rotational deformation. The mathematical formulas and the numerical solutions are found and represented in graphical forms. The results can be provided to bridge designers and researchers for further study of this type of structure subjected to wind loading.

  8. Radical polymerization of capillary bridges between micron-sized particles in liquid bulk phase as a low temperature route to produce porous solid materials.

    Science.gov (United States)

    Hauf, Katharina; Riazi, Kamran; Willenbacher, Norbert; Koos, Erin

    2017-10-01

    We present a generic and versatile low temperature route to produce macro-porous bodies with porosity and pore size distribution that are adjustable in a wide range. Capillary suspensions, where the minor fluid is a monomer, are used as pre-cursors. The monomer is preferentially located between the particles, creating capillary bridges, resulting in a strong, percolating network. Thermally induced polymerization of these bridges at temperatures below 100 °C for less than 5 hours and subsequent removal of the bulk fluid yields macroscopic, self-supporting solid bodies with high porosity. This process is demonstrated using methylmethacrylate and hydroxyethylmethacrlyate with glass particles as a model system. The produced PMMA had a molecular weight of about 500.000 g/mol and dispersity about three. Application specific porous bodies, including PMMA particles connected by PMMA bridges, micron-sized capsules containing phase change material with high inner surface, and porous graphite membranes with high electrical conductivity, are also shown.

  9. Monitoring Bridge Dynamic Deformation in Vibration by Digital Photography

    Science.gov (United States)

    Yu, Chengxin; Zhang, Guojian; Liu, Xiaodong; Fan, Li; Hai, Hua

    2018-01-01

    This study adopts digital photography to monitor bridge dynamic deformation in vibration. Digital photography in this study is based on PST-TBPM (photographing scale transformation-time baseline parallax method). Firstly, we monitor the bridge in static as a zero image. Then, we continuously monitor the bridge in vibration as the successive images. Based on the reference points on each image, PST-TBPM is used to calculate the images to obtain the dynamic deformation values of these deformation points. Results show that the average measurement accuracies are 0.685 pixels (0.51mm) and 0.635 pixels (0.47mm) in X and Z direction, respectively. The maximal deformations in X and Z direction of the bridge are 4.53 pixels and 5.21 pixels, respectively. PST-TBPM is valid in solving the problem that the photographing direction is not perpendicular to the bridge. Digital photography in this study can be used to assess bridge health through monitoring the dynamic deformation of a bridge in vibration. The deformation trend curves also can warn the possible dangers over time.

  10. 33 CFR 115.30 - Sufficiency of State authority for bridges.

    Science.gov (United States)

    2010-07-01

    ... for bridges. 115.30 Section 115.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.30 Sufficiency of State authority for bridges. An opinion of the attorney general of the State as to the sufficiency of State...

  11. Application of Artificial Intelligence for Bridge Deterioration Model

    Directory of Open Access Journals (Sweden)

    Zhang Chen

    2015-01-01

    Full Text Available The deterministic bridge deterioration model updating problem is well established in bridge management, while the traditional methods and approaches for this problem require manual intervention. An artificial-intelligence-based approach was presented to self-updated parameters of the bridge deterioration model in this paper. When new information and data are collected, a posterior distribution was constructed to describe the integrated result of historical information and the new gained information according to Bayesian theorem, which was used to update model parameters. This AI-based approach is applied to the case of updating parameters of bridge deterioration model, which is the data collected from bridges of 12 districts in Shanghai from 2004 to 2013, and the results showed that it is an accurate, effective, and satisfactory approach to deal with the problem of the parameter updating without manual intervention.

  12. Bridge Management Strategy Based on Extreme User Costs for Bridge Network Condition

    Directory of Open Access Journals (Sweden)

    Ladislaus Lwambuka

    2014-01-01

    Full Text Available This paper presents a practical approach for prioritization of bridge maintenance within a given bridge network. The maintenance prioritization is formulated as a multiobjective optimization problem where the simultaneous satisfaction of several conflicting objectives includes minimization of maintenance costs, maximization of bridge deck condition, and minimization of traffic disruption and associated user costs. The prevalence of user cost during maintenance period is twofold; the first case refers to the period of dry season where normally the traffic flow is diverted to alternative routes usually resurfaced to regain traffic access. The second prevalence refers to the absence of alternative routes which is often the case in the least developed countries; in this case the user cost referred to results from the waiting time while the traffic flow is put on hold awaiting accomplishment of the maintenance activity. This paper deals with the second scenario of traffic closure in the absence of alternative diversion routes which in essence results in extreme user cost. The paper shows that the multiobjective optimization approach remains valid for extreme cases of user costs in the absence of detour roads as often is the scenario in countries with extreme poor road infrastructure.

  13. Guardrails for Use on Historic Bridges: Volume 1—Replacement Strategies

    OpenAIRE

    Frosch, Robert J.; Kreger, Michael E.; Clauss, Adam J.

    2016-01-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridges can be subject to protection because of the role they play in aesthetics. Unfortunately, original railings on historic bridges do not typically meet current crash-test requirements and typically do not meet current standards for railing height and...

  14. Exploring the relevance of thiophene rings as bridge unit in acceptor-bridge-donor dyes on self-aggregation and performance in DSSCs.

    Science.gov (United States)

    Zarate, Ximena; Saavedra-Torres, Mario; Rodriguez-Serrano, Angela; Gomez, Tatiana; Schott, Eduardo

    2018-04-30

    The possibility of dye charge recombination in DSSCs remains a challenge for the field. This consists of: (a) back-transfer from the TiO 2 to the oxidized dye and (b) intermolecular electron transfer between dyes. The latter is attributed to dye aggregation due to dimeric conformations. This leads to poor electron injection which decreases the photocurrent conversion efficiency. Most organic sensitizers are characterized by an Acceptor-Bridge-Donor (A-Bridge-D) arrangement that is commonly employed to provide charge separation and, therefore, lowering the unwanted back-transfer. Here, we address the intermolecular electron transfer by studying the dimerization and photovoltaic performance of a group of A-Bridge-D structured dyes. Specifically, eight famous sulfur containing π-bridges were analyzed (A and D remained fixed). Through quantum mechanical and molecular dynamics approaches, it was found that the formation of weakly stabilized dimers is allowed. The dyes with covalently bonded and fused thiophene rings as Bridges, 6d and 7d as well as 8d with a fluorene, would present high aggregation and, therefore, high probability of recombination processes. Conversely, using TiO 2 cluster and surface models, delineated the shortest bridges to improve the adsorption energy and the stability of the system. Finally, the elongation of the bridge up to 2 and 3 units and their photovoltaic parameters were studied. These results showed that all the sensitizers are able to provide similar photocurrent outcomes, regardless of whether the bridge is elongated. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  15. Verification of LRFD Bridge Design and Analysis Software for INDOT

    OpenAIRE

    Varma, Amit H.; Seo, Jungil

    2009-01-01

    NCHRP Process 12-50 was implemented to evaluate and verify composite steel I-girder bridge design software used commonly in Indiana. A test-bed of twenty one bridges was developed with the guidance from an Indiana Department of Transportation appointed research advisory panel (RAP). The test-bed included five simple-span and sixteen multi-span bridge superstructures. More than 80 parameters were required to define a bridge and they include bridge span, girder spacing, number of beams, section...

  16. Expected damages of retrofitted bridges with RC jacketing

    Science.gov (United States)

    Montes, O.; Jara, J. M.; Jara, M.; Olmos, B. A.

    2015-07-01

    The bridge infrastructure in many countries of the world consists of medium span length structures built several decades ago and designed for very low seismic forces. Many of them are reinforced concrete structures that according to the current code regulations have to be rehabilitated to increase their seismic capacity. One way to reduce the vulnerability of the bridges is by using retrofitting techniques that increase the strength of the structure or by incorporating devices to reduce the seismic demand. One of the most common retrofit techniques of the bridges substructures is the use of RC jacketing; this research assesses the expected damages of seismically deficient medium length highway bridges retrofitted with reinforced concrete jacketing, by conducting a parametric study. We select a suite of twenty accelerograms of subduction earthquakes recorded close to the Pacific Coast in Mexico. The original structures consist of five 30 m span simple supported bridges with five pier heights of 5 m, 10 m, 15 m 20 and 25 m and the analyses include three different jacket thickness and three steel ratios. The bridges were subjected to the seismic records and non-linear time history analyses were carried out by using the OpenSEEs Plataform. Results allow selecting the reinforced concrete jacketing that better improves the expected seismic behavior of the bridge models.

  17. Expected damages of retrofitted bridges with RC jacketing

    International Nuclear Information System (INIS)

    Montes, O; Jara, J M; Jara, M; Olmos, B A

    2015-01-01

    The bridge infrastructure in many countries of the world consists of medium span length structures built several decades ago and designed for very low seismic forces. Many of them are reinforced concrete structures that according to the current code regulations have to be rehabilitated to increase their seismic capacity. One way to reduce the vulnerability of the bridges is by using retrofitting techniques that increase the strength of the structure or by incorporating devices to reduce the seismic demand. One of the most common retrofit techniques of the bridges substructures is the use of RC jacketing; this research assesses the expected damages of seismically deficient medium length highway bridges retrofitted with reinforced concrete jacketing, by conducting a parametric study. We select a suite of twenty accelerograms of subduction earthquakes recorded close to the Pacific Coast in Mexico. The original structures consist of five 30 m span simple supported bridges with five pier heights of 5 m, 10 m, 15 m 20 and 25 m and the analyses include three different jacket thickness and three steel ratios. The bridges were subjected to the seismic records and non-linear time history analyses were carried out by using the OpenSEEs Plataform. Results allow selecting the reinforced concrete jacketing that better improves the expected seismic behavior of the bridge models. (paper)

  18. Pilot testing of a hydraulic bridge exciter

    Directory of Open Access Journals (Sweden)

    Andersson Andreas

    2015-01-01

    Full Text Available This paper describes the development of a hydraulic bridge exciter and its first pilot testing on a full scale railway bridge in service. The exciter is based on a hydraulic load cylinder with a capacity of 50 kN and is intended for controlled dynamic loading up to at least 50 Hz. The load is applied from underneath the bridge, enabling testing while the railway line is in service. The system is shown to produce constant load amplitude even at resonance. The exciter is used to experimentally determine frequency response functions at all sensor locations, which serve as valuable input for model updating and verification. An FE-model of the case study bridge has been developed that is in good agreement with the experimental results.

  19. Post-Earthquake Traffic Capacity of Modern Bridges in California

    Science.gov (United States)

    2010-03-01

    Evaluation of the capacity of a bridge to carry self-weight and traffic loads after an earthquake is essential for a : safe and timely re-opening of the bridge. In California, modern highway bridges designed using the Caltrans : Seismic Design Criter...

  20. Detection of salt bridges to lysines in solution in barnase

    DEFF Research Database (Denmark)

    Hansen, Poul Erik; Williamson, Michael P.; Hounslow, Andrea M.

    2013-01-01

    We show that salt bridges involving lysines can be detected by deuterium isotope effects on NMR chemical shifts of the sidechain amine. Lys27 in the ribonuclease barnase is salt bridged, and mutation of Arg69 to Lys retains a partially buried salt bridge. The salt bridges are functionally important....

  1. Fabrication of ultrashort niobium variable-thickness bridges

    International Nuclear Information System (INIS)

    Goto, T.

    1982-01-01

    A simple technique for the fabrication of niobium variable-thickness bridges of length approx.0.1 μm is described. The bridges are found to operate as ideal Josephson junctions over a wide temperature range

  2. Bridging the Gap (BRIEFING CHARTS)

    Science.gov (United States)

    2007-03-05

    1 Defense Advanced Research Projects Agency “Bridging the Gap ” Dr. Robert F. Leheny Deputy Director Report Documentation Page Form ApprovedOMB No...comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to...4. TITLE AND SUBTITLE Bridging the Gap 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER

  3. Multi-Hazard Assessment of Scour Damaged Bridges with UAS-Based Measurements

    Science.gov (United States)

    Özcan, O.; Ozcan, O.

    2017-12-01

    Flood and stream induced scour occurring in bridge piers constructed on rivers is one of the mostly observed failure reasons in bridges. Scour induced failure risk in bridges and determination of the alterations in bridge safety under seismic effects has the ultimate importance. Thus, for the determination of bridge safety under the scour effects, the scour amount under bridge piers should be designated realistically and should be tracked and updated continuously. Hereby, the scour induced failures in bridge foundation systems will be prevented and bridge substructure design will be conducted safely. In this study, in order to measure the amount of scour in bridge load bearing system (pile foundations and pile abutments) and to attain very high definition 3 dimensional models of river flood plain for the flood analysis, unmanned aircraft system (UAS) based measurement methods were implemented. UAS based measurement systems provide new and practical approach and bring high precision and reliable solutions considering recent measurement systems. For this purpose, the reinforced concrete (RC) bridge that is located on Antalya Boğaçayı River, Turkey and that failed in 2003 due to flood-induced scour was selected as the case study. The amount of scour occurred in bridge piers and piles was determined realistically and the behavior of bridge piers under scour effects was investigated. Future flood effects and the resultant amount of scour was determined with HEC-RAS software by using digital surface models that were obtained at regular intervals using UAS for the riverbed. In the light of the attained scour measurements and expected scour after a probable flood event, the behavior of scour damaged RC bridge was investigated by pushover and time history analyses under lateral and vertical seismic loadings. In the analyses, the load and displacement capacity of bridge was observed to diminish significantly under expected scour. Thus, the deterioration in multi hazard

  4. Development of a numerical model for vehicle-bridge interaction analysis of railway bridges

    Science.gov (United States)

    Kim, Hee Ju; Cho, Eun Sang; Ham, Jun Su; Park, Ki Tae; Kim, Tae Heon

    2016-04-01

    In the field of civil engineering, analyzing dynamic response was main concern for a long time. These analysis methods can be divided into moving load analysis method and moving mass analysis method, and formulating each an equation of motion has recently been studied after dividing vehicles and bridges. In this study, the numerical method is presented, which can consider the various train types and can solve the equations of motion for a vehicle-bridge interaction analysis by non-iteration procedure through formulating the coupled equations for motion. Also, 3 dimensional accurate numerical models was developed by KTX-vehicle in order to analyze dynamic response characteristics. The equations of motion for the conventional trains are derived, and the numerical models of the conventional trains are idealized by a set of linear springs and dashpots with 18 degrees of freedom. The bridge models are simplified by the 3 dimensional space frame element which is based on the Euler-Bernoulli theory. The rail irregularities of vertical and lateral directions are generated by PSD functions of the Federal Railroad Administration (FRA).

  5. Guide for In-Place Treatment of Covered and Timber Bridges

    Science.gov (United States)

    Stan Lebow; Grant Kirker; Robert White; Terry Amburgey; H. Michael Barnes; Michael Sanders; Jeff Morrell

    2012-01-01

    Historic covered bridges and current timber bridges can be vulnerable to damage from biodeterioration or fire. This guide describes procedures for selecting and applying in-place treatments to prevent or arrest these forms of degradation. Vulnerable areas for biodeterioration in covered bridges include members contacting abutments, members near the ends of bridges...

  6. Risk Mitigation for Highway and Railway Bridges

    Science.gov (United States)

    2009-02-01

    Performance of the transportation network strongly depends on the performance of bridges. Bridges constitute a vital part of the transportation infrastructure system and they are vulnerable to extreme events such as natural disasters (i.e., hurricane...

  7. Development and validation of deterioration models for concrete bridge decks - phase 1 : artificial intelligence models and bridge management system.

    Science.gov (United States)

    2013-06-01

    This research documents the development and evaluation of artificial neural network (ANN) models to predict the condition ratings of concrete highway bridge decks in Michigan. Historical condition assessments chronicled in the national bridge invento...

  8. Bridge Condition Assessment based on Vibration Responses of Passenger Vehicle

    International Nuclear Information System (INIS)

    Miyamoto, Ayaho; Yabe, Akito

    2011-01-01

    In this paper, we propose a new method of assessing the condition of existing short- and medium-span reinforced/prestressed concrete bridges based on vibration monitoring data obtained from a public bus. This paper not only describes details of a prototype monitoring system that uses information technology and sensors capable of providing more accurate knowledge of bridge performance than conventional ways but also shows a few specific examples of bridge condition assessment based on vehicle vibrations measured by using an in-service public bus equipped with vibration measurement instrumentation. This paper also describes a sensitivity analysis of deteriorating bridges based on simulation of the acceleration response of buses conducted by the 'substructure method' employing a finite element model to verify the above bridge performance results. The main conclusions obtained in this study can be summarized as follows: (1) Because the vibration responses of passenger vehicles, such as buses, have a good linear relationship with the vibration responses of the target bridges, the proposed system can be used as a practical monitoring system for bridge condition assessment. (2) The results of sensitivity analysis performed by the substructure method show that bus vibration responses are useful for evaluating target bridge performance. (3) The proposed method was applied to a network of real bridges in a local area to evaluate its effectiveness. The results indicate that the proposed method can be used to prioritize the repair/strengthening works of existing bridges based on various vibration information in order to help bridge administrators establish rational maintenance strategies.

  9. Bridge scour countermeasure assessments at select bridges in the United States, 2014–16

    Science.gov (United States)

    Dudunake, Taylor J.; Huizinga, Richard J.; Fosness, Ryan L.

    2017-05-23

    In 2009, the Federal Highway Administration published Hydraulic Engineering Circular No. 23 (HEC-23) to provide specific design and implementation guidelines for bridge scour and stream instability countermeasures. However, the effectiveness of countermeasures implemented over the past decade following those guidelines has not been evaluated. Therefore, in 2013, the U.S. Geological Survey, in cooperation with the Federal Highway Administration, began a study to assess the current condition of bridge-scour countermeasures at selected sites to evaluate their effectiveness. Bridge-scour countermeasures were assessed during 2014-2016. Site assessments included reviewing countermeasure design plans, summarizing the peak and daily streamflow history, and assessments at each site. Each site survey included a photo log summary, field form, and topographic and bathymetric geospatial data and metadata. This report documents the study area and site-selection criteria, explains the survey methods used to evaluate the condition of countermeasures, and presents the complete documentation for each countermeasure assessment.

  10. Reserves in load capacity assessment of existing bridges

    Science.gov (United States)

    Žitný, Jan; Ryjáček, Pavel

    2017-09-01

    High percentage of all railway bridges in the Czech Republic is made of structural steel. Majority of these bridges is designed according to historical codes and according to the deterioration, they have to be assessed if they satisfy the needs of modern railway traffic. The load capacity assessment of existing bridges according to Eurocodes is however often too conservative and especially, braking and acceleration forces cause huge problems to structural elements of the bridge superstructure. The aim of this paper is to review the different approaches for the determination of braking and acceleration forces. Both, current and historical theoretical models and in-situ measurements are considered. The research of several local European state norms superior to Eurocode for assessment of existing railway bridges shows the big diversity of used local approaches and the conservativeness of Eurocode. This paper should also work as an overview for designers dealing with load capacity assessment, revealing the reserves for existing bridges. Based on these different approaches, theoretical models and data obtained from the measurements, the method for determination of braking and acceleration forces on the basis of real traffic data should be proposed.

  11. Electricity intensity backstop level to meet sustainable backstop supply technologies

    International Nuclear Information System (INIS)

    Verbruggen, Aviel

    2006-01-01

    The concept of a backstop level of electricity intensity is introduced and illustrated for the highest income economies of the world. The backstop level corresponds with the intensity that would be triggered by applying end-use electricity prices equal to the cost price of a fully sustainable electricity supply. Section 1 of the paper discusses the issue of electricity (also energy) intensity of economies. It is argued that identifying a 'demand for electricity intensity' bridges the gap between the high willingness to pay for electricity services on the one hand and the disinterested attitude of consumers regarding the invisible and impalpable product electricity on the other hand. Assessment of the demand curve for electricity intensity in a cross section of high income OECD countries comes to a long-run price elasticity of almost -1. Section 2 revives Nordhaus' concept of backstop supply technologies for weighing three power sources (fossil, nuclear, and renewable sources) in meeting today's criteria of sustainable backstop technology. Only renewable sources meet the main sustainability criteria, but the economic cost of a fully sustainable electricity supply will be elevated. The closing question of Section 3, that is, whether the countries can afford the high cost of backstop electricity supplies, is answered by indicating what reductions in intensity are required to keep the electricity bills stable. The targeted intensity level is called the backstop level, and provides a fixed point for electricity efficiency policies. The analysis supports the call for comprehensive and enduring tax reform policies

  12. Square function analysis of the Inductor-Converter Bridge

    International Nuclear Information System (INIS)

    Ehsani, M.; Kustom, R.L.

    1979-03-01

    The transfer of energy between two superconducting coils can be controlled with an Inductor-Converter Bridge (ICB) by changing the relative timing between the storage side bridge and the load side bridge. The average voltages on the coils have been previously derived as a function of relative timing between the two halves of the bridges and the relative currents in the two coils using a one-line, harmonic current source representation of each coil and its bridge network. Since the coil current in each of the ICB phases appears as bipolar rectangular pulses, an analysis based on unit step functions has been developed. The unit step function analysis leads to simple polynomial expressions relating the average coil voltages to relative timing. The new derivations are shown to have the same harmonic representation as previously developed. The polynomial expressions are more compatible to microprocessor control than are the harmonic function expressions

  13. Method for Measuring Small Nonlinearities of Electric Characteristics

    DEFF Research Database (Denmark)

    Guldbrandsen, Tom; Meyer, Niels I; Schjær-Jacobsen, Jørgen

    1965-01-01

    A method is described for measuring very small deviations from linearity in electric characteristics. The measurement is based on the harmonics generated by the nonlinear element when subjected to a sine wave signal. A special bridge circuit is used to balance out the undesired harmonics...... of the signal generator together with the first harmonic frequency. The set-up measures the small-signal value and the first and second derivative with respect to voltage. The detailed circuits are given for measuring nonlinearities in Ohmic and capacitive components. In the Ohmic case, a sensitivity...

  14. Design and construction of the Natorigawa Bridge; Natorigawa kyoryo no sekkei/seko

    Energy Technology Data Exchange (ETDEWEB)

    Murai, Y.; Oba, M.; Omurata, Y. [JR East Japan Railway Co., Tokyo (Japan); Miyauchi, M.; Iwasaki, I. [Taisei Corp., Tokyo (Japan)

    1997-03-31

    The Natorigawa Bridge is reconstructed. Out of the reconstruction work, a report is made mainly on the design of the superstructure work of the PC panel-stayed bridge and the details of the work. In selecting bridge type, PC simple through beam bridge, steel trussed bridge, PC cable-stayed bridge, and PC panel-stayed bridge are compared, and a 2-span continuous PC panel-stayed bridge is adopted. Its appearance resembles that of the cable-stayed bridge, but the structure resembles a girder bridge. The appropriate span length is the intermediate range between those of the girder bridge and the cable-stayed bridge. Its trafficability is excellent with little deformation by the running of trains because the main beam, diagonal panel, and the main tower are connected rigidly to provide high rigidity of the entire bridge. PRC structure is employed in consideration of the restriction to beam height and economical efficiency. Analyses by a FEM model using two dimensional plane elements and by a few plane frame models as well as comparison of sectional force are performed for this bridge, and a proper plane model is selected. Substructure work, superstructure work and measurement work are described. 3 refs., 16 figs., 6 tabs.

  15. Structural condition assessment of the bridge in Ostrava

    Directory of Open Access Journals (Sweden)

    Čech Jindřich

    2017-01-01

    Full Text Available This paper deals with the comparison of results of dynamic test and numerical modelling of a road bridge across the Dr. Kudela street in the street Rudná in Ostrava. The bridge is a reinforced concrete structure, made of post-tensioned KA-beams. On the bridge were verified material properties. Calculation model to validate the static and dynamic behavior of structures was created. On the bridge were measured dynamic properties (frequency, mode shapes and attenuation during excitation construction by hydraulic vibration exciter. Article will focus on comparing the results of the calculation of dynamic structures and properties measured on real structure upon excitation.

  16. Analytical investigation of bidirectional ductile diaphragms in multi-span bridges

    Science.gov (United States)

    Wei, Xiaone; Bruneau, Michel

    2018-04-01

    In the AASHTO Guide Specifications for Seismic Bridge Design Provisions, ductile diaphragms are identified as Permissible Earthquake-Resisting Elements (EREs), designed to help resist seismic loads applied in the transverse direction of bridges. When adding longitudinal ductile diaphragms, a bidirectional ductile diaphragm system is created that can address seismic excitations acting along both the bridge's longitudinal and transverse axes. This paper investigates bidirectional ductile diaphragms with Buckling Restrained Braces (BRBs) in straight multi-span bridge with simply supported floating spans. The flexibility of the substructures in the transverse and longitudinal direction of the bridge is considered. Design procedures for the bidirectional ductile diaphragms are first proposed. An analytical model of the example bridge with bidirectional ductile diaphragms, designed based on the proposed methodology, is then built in SAP2000. Pushover and nonlinear time history analyses are performed on the bridge model, and corresponding results are presented. The effect of changing the longitudinal stiffness of the bidirectional ductile diaphragms in the end spans connecting to the abutment is also investigated, in order to better understand the impact on the bridge's dynamic performance.

  17. An autonomous unmanned aerial vehicle sensing system for structural health monitoring of bridges

    Science.gov (United States)

    Reagan, Daniel; Sabato, Alessandro; Niezrecki, Christopher; Yu, Tzuyang; Wilson, Richard

    2016-04-01

    As civil infrastructure (i.e. bridges, railways, and tunnels) continues to age; the frequency and need to perform inspection more quickly on a broader scale increases. Traditional inspection and monitoring techniques (e.g., visual inspection, mechanical sounding, rebound hammer, cover meter, electrical potential measurements, ultrasound, and ground penetrating radar) may produce inconsistent results, require lane closure, are labor intensive and time-consuming. Therefore, new structural health monitoring systems must be developed that are automated, highly accurate, minimally invasive, and cost effective. Three-dimensional (3D) digital image correlation (DIC) systems have the merits of extracting full-field strain, deformation, and geometry profiles. These profiles can then be stitched together to generate a complete integrity map of the area of interest. Concurrently, unmanned aerial vehicles (UAVs) have emerged as valuable resources for positioning sensing equipment where it is either difficult to measure or poses a risk to human safety. UAVs have the capability to expedite the optical-based measurement process, offer increased accessibility, and reduce interference with local traffic. Within this work, an autonomous unmanned aerial vehicle in conjunction with 3D DIC was developed for monitoring bridges. The capabilities of the proposed system are demonstrated in both laboratory measurements and data collected from bridges currently in service. Potential measurement influences from platform instability, rotor vibration and positioning inaccuracy are also studied in a controlled environment. The results of these experiments show that the combination of autonomous flight with 3D DIC and other non-contact measurement systems provides a valuable and effective civil inspection platform.

  18. Geometry dependence of the magnetization reversal process in bridged dots

    International Nuclear Information System (INIS)

    Escobar, R.A.; Lage, E.; D’Albuquerque e Castro, J.; Altbir, D.; Ross, C.A.

    2017-01-01

    Based on Monte Carlo numerical simulations: results for the magnetization reversal process in thin circular Ni dots connected by a bridge are presented. The dependence of the process on both the width of the bridge and the orientation of the applied magnetic field has been investigated. It was found that when the applied magnetic field is set parallel to the bridge, the hysteresis curves are weakly dependent on the width of the bridge, being rather close to that of a single dot of the same diameter. On the other hand, when the magnetic field is applied perpendicularly to the bridge, a significant reduction in the coercivity of the system is obtained, even in the case of narrower bridges.

  19. Geometry dependence of the magnetization reversal process in bridged dots

    Energy Technology Data Exchange (ETDEWEB)

    Escobar, R.A. [Departamento de Física, CEDENNA, Universidad de Santiago de Chile, USACH, Av. Ecuador 3493, Santiago (Chile); Lage, E. [Department of Materials Science and Engineering, Massachusetts Institute of Technology, 02139 Cambridge, MA (United States); D’Albuquerque e Castro, J. [Instituto de Física, Universidade Federal do Rio de Janeiro, Caixa Postal 68528, Rio de Janeiro, RJ 21945-970 (Brazil); Altbir, D., E-mail: dora.altbir@usach.cl [Departamento de Física, CEDENNA, Universidad de Santiago de Chile, USACH, Av. Ecuador 3493, Santiago (Chile); Ross, C.A. [Department of Materials Science and Engineering, Massachusetts Institute of Technology, 02139 Cambridge, MA (United States)

    2017-06-15

    Based on Monte Carlo numerical simulations: results for the magnetization reversal process in thin circular Ni dots connected by a bridge are presented. The dependence of the process on both the width of the bridge and the orientation of the applied magnetic field has been investigated. It was found that when the applied magnetic field is set parallel to the bridge, the hysteresis curves are weakly dependent on the width of the bridge, being rather close to that of a single dot of the same diameter. On the other hand, when the magnetic field is applied perpendicularly to the bridge, a significant reduction in the coercivity of the system is obtained, even in the case of narrower bridges.

  20. Renovation techniques for fatigue cracked orthotropic steel bridge decks

    NARCIS (Netherlands)

    de Jong, F.B.P.

    2007-01-01

    This dissertation presents the research into renovation techniques for orthotropic steel bridge decks. These techniques are needed to solve fatigue problems in the decks of these bridges, as several fatigue cracks have been detected in the deck structure of these bridges the last decade. A

  1. PARAMETRIC STUDY OF SKEW ANGLE ON BOX GIRDER BRIDGE DECK

    OpenAIRE

    Shrikant D. Bobade *, Dr. Valsson Varghese

    2016-01-01

    Box girder bridge deck, is the most common type of bridges in world and India, it consists of several Slab or girders. The span in the direction of the roadway and connected across their tops and bottoms by a thin continuous structural stab, the longitudinal box girders can be made of steel or concrete. The Simple supported single span concrete bridge deck is presented in present study. Skewed bridges are suitable in highway design when the geometry of straight bridges is not possible. The sk...

  2. 33 CFR 401.52 - Limit of approach to a bridge.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Limit of approach to a bridge... approach to a bridge. (a) No vessel shall pass the limit of approach sign at any movable bridge until the bridge is in a fully open position and the signal light shows green. (b) No vessel shall pass the limit...

  3. Active Control of Long Bridges Using Flaps

    DEFF Research Database (Denmark)

    Hansen, H. I.; Thoft-Christensen, Palle

    The main problem in designing ultra-long span suspension bridges is flutter. A solution to this problem might be to introduce an active flap control system to increase the flutter wind velocity. The investigated flap control system consists of flaps integrated in the bridge girder so each flap...... is the streamlined part of the edge of the girder. Additional aerodynamic derivatives are shown for the flaps and it is shown how methods already developed can be used to estimate the flutter wind velocity for a bridge section with flaps. As an example, the flutter wind velocity is calculated for different flap...... configurations for a bridge section model by using aerodynamic derivatives for a flat plate. The example shows that different flap configurations can either increase or decrease the flutter wind velocity. for optimal flap configurations flutter will not occur....

  4. Active aerodynamic stabilisation of long suspension bridges

    DEFF Research Database (Denmark)

    Nissen, Henrik Ditlev; Sørensen, Paul Haase; Jannerup, Ole Erik

    2004-01-01

    The paper describes the addition of actively controlled appendages (flaps) attached along the length of the bridge deck to dampen wind-induced oscillations in long suppension bridges. A novel approach using control systems methods for the analysis of dynamic stability is presented. In order to make...... use of control analysis and design techniques, a linear model of the structural and aerodynamic motion around equilibriun is developed. The model is validated through comparison with finite element calculations and wind tunnel experimental data on the Great Belt East Bridge in Denmark. The developed...... active control scheme is local in that the flap control signal at a given longitudinal position along the bridge only depends on local motion measurements. The analysis makes use of the Nyquist stability criteria and an anlysis of the sensitivity function for stability analysis. The analysis shows...

  5. Bridge Suture for Successful McDonald Emergency Cerclage.

    Science.gov (United States)

    Tanaka, Masaaki; Hori, Yoshiaki; Shirafuji, Aya; Kato, Mitsunori; Kato, Jyun; Kobayashi, Hiroto; Tsuchida, Toru; Fukae, Tsukasa

    2017-01-01

    To create awareness about a surgical technique termed bridge suture, which is performed as a pretreatment before a McDonald cerclage is performed on an emergency to treat severe cervical insufficiency. Procedures for bridge suture were reviewed in detail and outcomes of 16 patients treated with bridge suture followed by McDonald cerclage were evaluated retrospectively. Using the bridge suture, the edges of uterine cervix were temporarily sutured and the external uterine os was closed, while the hourglass-shaped fetal membranes were concomitantly confined within the cervix; subsequently, a McDonald cerclage was performed. Over a 22-year period, 16 patients with a dilated cervix and bulging fetal membranes were treated using the technique of bridge suture followed by an emergency cerclage. The mean gestational age at cerclage was 22.5 weeks; the mean gestational age at delivery was 30.7 weeks; and the mean interval between cerclage and delivery was 8.2 weeks. In 15 out of 16 cases, cerclage was performed without encountering any complications. No maternal complications, including cervical laceration, were observed. The mean body weight of 17 neonates, including that of a twin, was 1,516 g and of them, 15 neonates survived. The important outcome of bridge suture is the replacement of fetal membranes back into the uterine cavity before McDonald's cerclage is performed. Pretreatment with bridge suture may facilitate the performance of a successful emergency cerclage and contribute to good maternal and neonatal outcomes. © 2016 S. Karger AG, Basel.

  6. Bivariate Gaussian bridges: directional factorization of diffusion in Brownian bridge models.

    Science.gov (United States)

    Kranstauber, Bart; Safi, Kamran; Bartumeus, Frederic

    2014-01-01

    In recent years high resolution animal tracking data has become the standard in movement ecology. The Brownian Bridge Movement Model (BBMM) is a widely adopted approach to describe animal space use from such high resolution tracks. One of the underlying assumptions of the BBMM is isotropic diffusive motion between consecutive locations, i.e. invariant with respect to the direction. Here we propose to relax this often unrealistic assumption by separating the Brownian motion variance into two directional components, one parallel and one orthogonal to the direction of the motion. Our new model, the Bivariate Gaussian bridge (BGB), tracks movement heterogeneity across time. Using the BGB and identifying directed and non-directed movement within a trajectory resulted in more accurate utilisation distributions compared to dynamic Brownian bridges, especially for trajectories with a non-isotropic diffusion, such as directed movement or Lévy like movements. We evaluated our model with simulated trajectories and observed tracks, demonstrating that the improvement of our model scales with the directional correlation of a correlated random walk. We find that many of the animal trajectories do not adhere to the assumptions of the BBMM. The proposed model improves accuracy when describing the space use both in simulated correlated random walks as well as observed animal tracks. Our novel approach is implemented and available within the "move" package for R.

  7. In-channel electrochemical detection in the middle of microchannel under high electric field.

    Science.gov (United States)

    Kang, Chung Mu; Joo, Segyeong; Bae, Je Hyun; Kim, Yang-Rae; Kim, Yongseong; Chung, Taek Dong

    2012-01-17

    We propose a new method for performing in-channel electrochemical detection under a high electric field using a polyelectrolytic gel salt bridge (PGSB) integrated in the middle of the electrophoretic separation channel. The finely tuned placement of a gold working electrode and the PGSB on an equipotential surface in the microchannel provided highly sensitive electrochemical detection without any deterioration in the separation efficiency or interference of the applied electric field. To assess the working principle, the open circuit potentials between gold working electrodes and the reference electrode at varying distances were measured in the microchannel under electrophoretic fields using an electrically isolated potentiostat. In addition, "in-channel" cyclic voltammetry confirmed the feasibility of electrochemical detection under various strengths of electric fields (∼400 V/cm). Effective separation on a microchip equipped with a PGSB under high electric fields was demonstrated for the electrochemical detection of biological compounds such as dopamine and catechol. The proposed "in-channel" electrochemical detection under a high electric field enables wider electrochemical detection applications in microchip electrophoresis.

  8. Fiber reinforced polymer bridge decks : [technical summary].

    Science.gov (United States)

    2011-01-01

    A number of researchers have addressed the use of Fiber Reinforced Polymer (FRP) deck as a replacement solution for deteriorated bridge decks made of traditional materials. The use of new, advanced materials such as FRP is advantageous when the bridg...

  9. A low-noise measurement system for scanning thermal microscopy resistive nanoprobes based on a transformer ratio-arm bridge

    Science.gov (United States)

    Świątkowski, Michał; Wojtuś, Arkadiusz; Wielgoszewski, Grzegorz; Rudek, Maciej; Piasecki, Tomasz; Jóźwiak, Grzegorz; Gotszalk, Teodor

    2018-04-01

    Atomic force microscopy (AFM) is a widely used technology for the investigation and characterization of nanomaterials. Its functionality can be easily expanded by applying dedicated extension modules, which can measure the electrical conductivity or temperature of a sample. In this paper, we introduce a transformer ratio-arm bridge setup dedicated to AFM-based thermal imaging. One of the key features of the thermal module is the use of a low-power driving signal that prevents undesirable tip heating during resistance measurement, while the other is the sensor location in a ratio-arm transformer bridge working in the audio frequency range and ensuring galvanic isolation of the tip, enabling contact-mode scanning of electronic circuits. The proposed expansion module is compact and it can be integrated onto the AFM head close to the cantilever. The calibration process and the resolution of 11 mK of the proposed setup are shown.

  10. Natural canopy bridges effectively mitigate tropical forest fragmentation for arboreal mammals.

    Science.gov (United States)

    Gregory, Tremaine; Carrasco-Rueda, Farah; Alonso, Alfonso; Kolowski, Joseph; Deichmann, Jessica L

    2017-06-20

    Linear infrastructure development and resulting habitat fragmentation are expanding in Neotropical forests, and arboreal mammals may be disproportionately impacted by these linear habitat clearings. Maintaining canopy connectivity through preservation of connecting branches (i.e. natural canopy bridges) may help mitigate that impact. Using camera traps, we evaluated crossing rates of a pipeline right-of-way in a control area with no bridges and in a test area where 13 bridges were left by the pipeline construction company. Monitoring all canopy crossing points for a year (7,102 canopy camera nights), we confirmed bridge use by 25 mammal species from 12 families. With bridge use beginning immediately after exposure and increasing over time, use rates were over two orders of magnitude higher than on the ground. We also found a positive relationship between a bridge's use rate and the number of species that used it, suggesting well-used bridges benefit multiple species. Data suggest bridge use may be related to a combination of bridge branch connectivity, multiple connections, connectivity to adjacent forest, and foliage cover. Given the high use rate and minimal cost, we recommend all linear infrastructure projects in forests with arboreal mammal populations include canopy bridges.

  11. Monitoring bridge scour using fiber optic sensors : [tech summary].

    Science.gov (United States)

    2015-04-01

    It is well known that scour is one of the major causes of bridge failures. In the last 30 years, more than 1,000 bridges collapsed in : the US and about 60% of the failures are related to the scour of bridges foundations. Due to the difficulty in ...

  12. SiC MOSFETs based split output half bridge inverter

    DEFF Research Database (Denmark)

    Li, Helong; Munk-Nielsen, Stig; Beczkowski, Szymon

    2014-01-01

    output. The double pulse test shows the devices' current during commutation process and the reduced switching losses of SiC MOSFETs compared to that of the traditional half bridge. The efficiency comparison is presented with experimental results of half bridge power inverter with split output...... and traditional half bridge inverter, from switching frequency 10 kHz to 100 kHz. The experimental results comparison shows that the half bridge with split output has an efficiency improvement of more than 0.5% at 100 kHz switching frequency....

  13. Study on the structure of bridge surface of the micro Fabry-Perot cavity tunable filter

    International Nuclear Information System (INIS)

    Meng Qinghua; Luo Huan; Bao Shiwei; Zhou Yifan; Chen Sihai

    2011-01-01

    Micro Fabry-Perot cavity tunable filters are widely applied in the area of Pushbroom Hyperspectral imaging, DWDM optical communication system and self-adaptive optics. With small volume, lower consumption and cost, the Micro Fabry-Perot cavity tunable filter can realize superior response speed, large spectral range, high definition and high reliability. By deposition metal membrane on silicon chip by MEMS technology, the micro Fabry-Perot cavity has been achieved, which is actuated by electrostatic force and can realize the function of an optical filter. In this paper, the micro-bridge structure of the micro Fabry-Perot cavity tunable filter has been studied. Finite element analysis software COMSOL Multiphysics has been adopted to design the structure of the micro-bridge of the micro filter. In order to simulate the working mechanism of the micro Fabry-Perot cavity and study the electrical and mechanical characteristics of the micro tunable filter,the static and dynamic characteriastics are analyzed, such as stress, displacement, transient response, etc. The corresponding parameters of the structure are considered as well by optimizition the filter's sustain structure.

  14. Monitoring Bridge Dynamic Responses Using Fiber Bragg Grating Tiltmeters.

    Science.gov (United States)

    Xiao, Feng; Chen, Gang S; Hulsey, J Leroy

    2017-10-20

    In bridge health monitoring, tiltmeters have been used for measuring rotation and curvature; however, their application in dynamic parameter identification has been lacking. This study installed fiber Bragg grating (FBG) tiltmeters on the bearings of a bridge and monitored the dynamic rotational angle. The dynamic features, including natural frequencies and mode shapes, have been identified successfully. The innovation presented in this paper is the first-time use of FBG tiltmeter readings to identify the natural frequencies of a long-span steel girder bridge. The identified results have been verified using a bridge finite element model. This paper introduces a new method for the dynamic monitoring of a bridge using FBG tiltmeters. Limitations and future research directions are also discussed in the conclusion.

  15. Monitoring Bridge Dynamic Responses Using Fiber Bragg Grating Tiltmeters

    Directory of Open Access Journals (Sweden)

    Feng Xiao

    2017-10-01

    Full Text Available In bridge health monitoring, tiltmeters have been used for measuring rotation and curvature; however, their application in dynamic parameter identification has been lacking. This study installed fiber Bragg grating (FBG tiltmeters on the bearings of a bridge and monitored the dynamic rotational angle. The dynamic features, including natural frequencies and mode shapes, have been identified successfully. The innovation presented in this paper is the first-time use of FBG tiltmeter readings to identify the natural frequencies of a long-span steel girder bridge. The identified results have been verified using a bridge finite element model. This paper introduces a new method for the dynamic monitoring of a bridge using FBG tiltmeters. Limitations and future research directions are also discussed in the conclusion.

  16. Measurement of gastrointestinal transmural electric potential difference in man.

    Science.gov (United States)

    Geall, M G; Code, C F; McIlrath, D C; Summerskill, W H

    1970-01-01

    Measurement, in man, of the electric potential difference between venous blood and the mucosal surface of the gastrointestinal tract gave identical values to the potential difference between mucosa and serosa. Various parts of the peritoneum were equipotential with venous blood. By contrast, skin-enteric potential difference varied with time and among different subjects because of a potential difference between skin and blood that is unpredictably reduced by skin injury. The results with electrolyte bridges of KCl in agar or of flowing KCl were identical.

  17. Hybrid FRP-concrete bridge deck system final report II : long term performance of hybrid FRP-concrete bridge deck system.

    Science.gov (United States)

    2009-06-01

    This report describes the investigation of the long term structural performance of a : hybrid FRP-concrete (HFRPC) bridge deck on steel girders. The study aimed at : assessing three long term aspects pertaining to the HFRPC bridge deck: (1) creep : c...

  18. Observing Bridge Dynamic Deflection in Green Time by Information Technology

    Science.gov (United States)

    Yu, Chengxin; Zhang, Guojian; Zhao, Yongqian; Chen, Mingzhi

    2018-01-01

    As traditional surveying methods are limited to observe bridge dynamic deflection; information technology is adopted to observe bridge dynamic deflection in Green time. Information technology used in this study means that we use digital cameras to photograph the bridge in red time as a zero image. Then, a series of successive images are photographed in green time. Deformation point targets are identified and located by Hough transform. With reference to the control points, the deformation values of these deformation points are obtained by differencing the successive images with a zero image, respectively. Results show that the average measurement accuracies of C0 are 0.46 pixels, 0.51 pixels and 0.74 pixels in X, Z and comprehensive direction. The average measurement accuracies of C1 are 0.43 pixels, 0.43 pixels and 0.67 pixels in X, Z and comprehensive direction in these tests. The maximal bridge deflection is 44.16mm, which is less than 75mm (Bridge deflection tolerance value). Information technology in this paper can monitor bridge dynamic deflection and depict deflection trend curves of the bridge in real time. It can provide data support for the site decisions to the bridge structure safety.

  19. Comparison of Ferry Boat and Highway Bridge Energy Use

    Directory of Open Access Journals (Sweden)

    Wayne D. Cottrell

    2011-01-01

    Full Text Available Passenger ferries serve a variety of transport needs in the U.S., such as providing vital links across bodies of water, and supplementing highway bridges. In some cases in which there is a ferry connection but no bridge, a bridge would be impractical; in other cases, a bridge might be feasible. The paper compares the energy consumption of ferries and motor vehicles on bridges, to determine which link is more fuel efficient. One finding is that limited data are available on ferry boat fuel consumption: despite there being 208 ferry boat operators in the U.S. as of 2008, only eight were providing energy use data to the National Transit Database. Examinations of three of the systems found that the passenger-MPG of the ferries ranged from 2.61 to 14.00 (1.11 to 5.95 km/L, while that of the motor vehicles on adjacent highway bridge connections ranged from 25.34 to 32.45 (10.77 to 13.79 km/L. Data from the eight systems are used to develop a ferry MPG model. The model is used to show that the Ryer Island and Charles Hall Ferries are less fuel efficient than hypothetical bridges in those locations. The fuel efficiencies and consumptions of the ferries would equal those of motor vehicles on the bridges, however, if smaller vessels were used, and if the frequency of service was reduced.

  20. Bridge Therapy Outcomes in Patients With Mechanical Heart Valves.

    Science.gov (United States)

    Delate, Thomas; Meisinger, Stephanie M; Witt, Daniel M; Jenkins, Daniel; Douketis, James D; Clark, Nathan P

    2017-11-01

    Bridge therapy is associated with an increased risk of major bleeding in patients with atrial fibrillation and venous thromboembolism (TE) without a corresponding reduction in TE. The benefits of bridge therapy in patients with mechanical heart valve (MHV) prostheses interrupting warfarin for invasive procedures are not well described. A retrospective cohort study was conducted at an integrated health-care delivery system. Anticoagulated patients with MHV interrupting warfarin for invasive diagnostic or surgical procedures between January 1, 2006, and March 31, 2012, were identified. Patients were categorized according to exposure to bridge therapy during the periprocedural period and TE risk (low, medium, and high). Outcomes validated via manual chart review included clinically relevant bleeding, TE, and all-cause mortality in the 30 days following the procedure. There were 547 procedures in 355 patients meeting inclusion criteria. Mean cohort age was 65.2 years, and 38% were female. Bridge therapy was utilized in 466 (85.2%) procedures (95.2%, 77.3%, and 65.8% of high, medium, and low TE risk category procedures, respectively). The 30-day rate of clinically relevant bleeding was numerically higher in bridged (5.8%; 95% confidence interval [CI], 3.9%-8.3%) versus not bridged procedures (1.2%; 95% CI, bridge therapy is common among patients with MHV and may be associated with increased bleeding risk. Further research is needed to determine whether bridge therapy reduces TE in patients with MHV interrupting warfarin for invasive procedures.

  1. Neuroversion: using electroconvulsive therapy as a bridge to deep brain stimulation implantation.

    Science.gov (United States)

    Williams, Nolan R; Sahlem, Greg; Pannu, Jaspreet; Takacs, Istvan; Short, Baron; Revuelta, Gonzalo; George, Mark S

    2017-02-01

    Parkinson's disease (PD) is a movement disorder with significant neuropsychiatric comorbidities. Electroconvulsive therapy (ECT) is effective in treating these neuropsychiatric symptoms; however, clinicians are reluctant to use ECT in patients with deep brain stimulation (DBS) implantations for fear of damaging the device, as well as potential cognitive side effects. Right unilateral ultra-brief pulse (RUL UBP) ECT has a more favorable cognitive side-effect profile yet has never been reported in PD patients with DBS implants. We present a case series of three patients with a history of PD that all presented with psychiatric decompensation immediately prior to planned DBS surgery. All three patients had DBS electrode(s) in place at the time and an acute course of ECT was utilized in a novel method to "bridge" these individuals to neurosurgery. The patients all experienced symptom resolution (psychosis and/or depression and/or anxiety) without apparent cognitive side effects. This case series not only illustrates that right unilateral ultra-brief pulse can be utilized in patients with DBS electrodes but also illustrates that this intervention can be utilized as a neuromodulatory "bridge", where nonoperative surgical candidates with unstable psychiatric symptoms can be converted to operative candidates in a manner similar to electrical cardioversion.

  2. Damage Identification for Prestressed Adjacent Box-Beam Bridges

    Directory of Open Access Journals (Sweden)

    Kenneth K. Walsh

    2014-01-01

    Full Text Available Structural health monitoring (SHM has gained considerable attention as a tool for monitoring the health of civil infrastructure. For bridge infrastructure, previous methods have focused on the detection of localized damage through modal parameters extracted from the longitudinal direction of the structure. This paper investigates a new damage detection method based on the change in the first vertical mode extracted from the transverse direction of the bridge. The mode is determined through application of modal curve fitting to frequency response functions (FRFs that are formed using vertical response data obtained in the direction perpendicular to the bridge’s longitudinal axis. Using this method, both local damage and global damage in the bridge reveal themselves as having a localized effect on the bridge response. Furthermore, damage is revealed in such a way that it enables differentiation of the damage types. To demonstrate the effectiveness of the method, modal parameters were extracted from acceleration data obtained from a finite element model of a full bridge. Analysis of the modal parameters showed that the proposed approach could not only detect both local and global bridge damage, but could also differentiate between damage types using only one mode shape. The proposed method was compared to a previously developed SHM method.

  3. An Accelerometer-Based Sensor System for Real-Time Bridge Scour Monitoring

    Directory of Open Access Journals (Sweden)

    Yi-Jie Hsieh

    2015-11-01

    Full Text Available With the fast global climate change, many bridge structures are facing the nature disasters such as earthquakes and floods. The damage of bridges can cause the severe cost of human life and property. The heavy rain brought by the typhoon in July and August in Taiwan causes the bridge scour and makes the damage or collapse for bridges. Since scour is one of the major causes for bridge failure, how to monitor the bridge scour becomes an important task in Taiwan. This paper presents a real-time bridge scour monitoring system based on accelerometer sensors. The presented sensor network consists of a gateway node and under-water sensor nodes with the wired RS-485 communication protocol. The proposed master-slave architecture of the bridge scour monitoring system owns the scalability and flexibility and is setup in the field currently. The experimental results in the field show the presented sensor system can detect the bridge scour effectively with our proposed scour detection algorithm in real time.

  4. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...

  5. Disulfide Bridges: Bringing Together Frustrated Structure in a Bioactive Peptide.

    Science.gov (United States)

    Zhang, Yi; Schulten, Klaus; Gruebele, Martin; Bansal, Paramjit S; Wilson, David; Daly, Norelle L

    2016-04-26

    Disulfide bridges are commonly found covalent bonds that are usually believed to maintain structural stability of proteins. Here, we investigate the influence of disulfide bridges on protein dynamics through molecular dynamics simulations on the cysteine-rich trypsin inhibitor MCoTI-II with three disulfide bridges. Correlation analysis of the reduced cyclic peptide shows that two of the three disulfide distances (Cys(11)-Cys(23) and Cys(17)-Cys(29)) are anticorrelated within ∼1 μs of bridge formation or dissolution: when the peptide is in nativelike structures and one of the distances shortens to allow bond formation, the other tends to lengthen. Simulations over longer timescales, when the denatured state is less structured, do not show the anticorrelation. We propose that the native state contains structural elements that frustrate one another's folding, and that the two bridges are critical for snapping the frustrated native structure into place. In contrast, the Cys(4)-Cys(21) bridge is predicted to form together with either of the other two bridges. Indeed, experimental chromatography and nuclear magnetic resonance data show that an engineered peptide with the Cys(4)-Cys(21) bridge deleted can still fold into its near-native structure even in its noncyclic form, confirming the lesser role of the Cys(4)-Cys(21) bridge. The results highlight the importance of disulfide bridges in a small bioactive peptide to bring together frustrated structure in addition to maintaining protein structural stability. Copyright © 2016 Biophysical Society. Published by Elsevier Inc. All rights reserved.

  6. Study on the Old Girders in the Widening Hollow Slab Girder Bridge

    Science.gov (United States)

    Wang, Ying; Zhang, Li Fang; Ma, Hai Yan

    2018-06-01

    Taking the bridge widening project of Shanghai-Hangzhou-Ningbo expressway widening construction project (China) as the background in this paper, the variation law of the internal force of the old bridge in the widening hollow slab girder bridge under vehicle load is studied, which is under the condition of different span lengths and different widening widths. Three different span lengths of the pre-tensioned prestressed hollow slab girder bridges are selected, the spatial finite element models of both the old bridge and the whole structure of widening bridge are established and calculated respectively by Midas/Civil software. The influences of widening and load increasing on the old bridges under the vehicle load are compared and analyzed. In addition, the authors also analyze the influences of different widening widths on the force state of old bridges under the condition of widening the same number of lane. Moreover , the effects on the old bridges that are caused by the uneven foundation settlement of widening bridge structure are also studied in this paper. This paper can provide some references for widening design of hollow slab bridges.

  7. RISK LEVEL ANALYSIS ON THE PREVENTIVE EROSION CAPACITY OF BRIDGES

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    Deficiency of the Preventive Erosion Capacity (PEC) of a bridge pier is the main factor leading to bridge failures. In this paper, the PEC of bridge piers was analyzed using the stochastic analysis method. The definitions of the reliability and risk level of a bridge pier subjected to water erosion were proposed and a computational model for erosion depth and risk level in was suggested.

  8. 305 Building 2 ton bridge crane and monorail assembly analysis

    International Nuclear Information System (INIS)

    Axup, M.D.

    1995-12-01

    The analyses in the appendix of this document evaluate the integrity of the existing bridge crane structure, as depicted on drawing H-3-34292, for a bridge crane and monorail assembly with a load rating of 2 tons. This bridge crane and monorail assembly is a modification of a 1 1/2 ton rated manipulator bridge crane which originally existed in the 305 building

  9. Isolated step-down DC -DC converter for electric vehicles

    Science.gov (United States)

    Kukovinets, O. V.; Sidorov, K. M.; Yutt, V. E.

    2018-02-01

    Modern motor-vehicle industrial sector is moving rapidly now towards the electricity-driving cars production, improving their range and efficiency of components, and in particular the step-down DC/DC converter to supply the onboard circuit 12/24V of electric vehicle from the high-voltage battery. The purpose of this article - to identify the best circuitry topology to design an advanced step-down DC/DC converters with the smallest mass, volume, highest efficiency and power. And this will have a positive effect on driving distance of electric vehicle (EV). On the basis of computational research of existing and implemented circuit topologies of step-down DC/DC converters (serial resonant converter, full bridge with phase-shifting converter, LLC resonant converter) a comprehensive analysis was carried out on the following characteristics: specific volume, specific weight, power, efficiency. The data obtained was the basis for the best technical option - LLC resonant converter. The results can serve as a guide material in the process of components design of the traction equipment for electric vehicles, providing for the best technical solutions in the design and manufacturing of converting equipment, self-contained power supply systems and advanced driver assistance systems.

  10. Optimal Wind Power Uncertainty Intervals for Electricity Market Operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ying; Zhou, Zhi; Botterud, Audun; Zhang, Kaifeng

    2018-01-01

    It is important to select an appropriate uncertainty level of the wind power forecast for power system scheduling and electricity market operation. Traditional methods hedge against a predefined level of wind power uncertainty, such as a specific confidence interval or uncertainty set, which leaves the questions of how to best select the appropriate uncertainty levels. To bridge this gap, this paper proposes a model to optimize the forecast uncertainty intervals of wind power for power system scheduling problems, with the aim of achieving the best trade-off between economics and reliability. Then we reformulate and linearize the models into a mixed integer linear programming (MILP) without strong assumptions on the shape of the probability distribution. In order to invest the impacts on cost, reliability, and prices in a electricity market, we apply the proposed model on a twosettlement electricity market based on a six-bus test system and on a power system representing the U.S. state of Illinois. The results show that the proposed method can not only help to balance the economics and reliability of the power system scheduling, but also help to stabilize the energy prices in electricity market operation.

  11. Assessment of concrete bridge decks with alkali silica reactions

    DEFF Research Database (Denmark)

    Eriksen, Kirsten; Jansson, Jacob; Geiker, Mette Rica

    2008-01-01

    Based on investigations of concrete from an approximately 40 years old bridge a procedure to support the management of maintenance and repair of alkali silica damaged bridges is proposed. Combined petrography and accelerated expansion testing were undertaken on cores from the Bridge at Skovdiget......, Bagsværd, Denmark to provide information on the damage condition as well as the residual reactivity of the concrete. The Danish Road Directory’s guidelines for inspection and assessment of alkali silica damaged bridges will be briefly presented, and proposed modifications will be describe...

  12. Design Optimization of Hybrid FRP/RC Bridge

    Science.gov (United States)

    Papapetrou, Vasileios S.; Tamijani, Ali Y.; Brown, Jeff; Kim, Daewon

    2018-04-01

    The hybrid bridge consists of a Reinforced Concrete (RC) slab supported by U-shaped Fiber Reinforced Polymer (FRP) girders. Previous studies on similar hybrid bridges constructed in the United States and Europe seem to substantiate these hybrid designs for lightweight, high strength, and durable highway bridge construction. In the current study, computational and optimization analyses were carried out to investigate six composite material systems consisting of E-glass and carbon fibers. Optimization constraints are determined by stress, deflection and manufacturing requirements. Finite Element Analysis (FEA) and optimization software were utilized, and a framework was developed to run the complete analyses in an automated fashion. Prior to that, FEA validation of previous studies on similar U-shaped FRP girders that were constructed in Poland and Texas is presented. A finer optimization analysis is performed for the case of the Texas hybrid bridge. The optimization outcome of the hybrid FRP/RC bridge shows the appropriate composite material selection and cross-section geometry that satisfies all the applicable Limit States (LS) and, at the same time, results in the lightest design. Critical limit states show that shear stress criteria determine the optimum design for bridge spans less than 15.24 m and deflection criteria controls for longer spans. Increased side wall thickness can reduce maximum observed shear stresses, but leads to a high weight penalty. A taller cross-section and a thicker girder base can efficiently lower the observed deflections and normal stresses. Finally, substantial weight savings can be achieved by the optimization framework if base and side-wall thickness are treated as independent variables.

  13. Optimal DG placement in deregulated electricity market

    International Nuclear Information System (INIS)

    Gautam, Durga; Mithulananthan, Nadarajah

    2007-01-01

    This paper presents two new methodologies for optimal placement of distributed generation (DG) in an optimal power flow (OPF) based wholesale electricity market. DG is assumed to participate in real time wholesale electricity market. The problem of optimal placement, including size, is formulated for two different objectives, namely, social welfare maximization and profit maximization. The candidate locations for DG placement are identified on the basis of locational marginal price (LMP). Obtained as lagrangian multiplier associated with active power flow equation for each node, LMP gives the short run marginal cost (SRMC) of electricity. Consumer payment, evaluated as a product of LMP and load at each load bus, is proposed as another ranking to identify candidate nodes for DG placement. The proposed rankings bridges engineering aspects of system operation and economic aspects of market operation and act as good indicators for the placement of DG, especially in a market environment. In order to provide a scenario of variety of DGs available in the market, several cost characteristics are assumed. For each DG cost characteristic, an optimal placement and size is identified for each of the objectives. The proposed methodology is tested in a modified IEEE 14 bus test system. (author)

  14. SOLUTION FOR AN EQUIPMENT OF RAILWAY BRIDGE MONITORING

    Directory of Open Access Journals (Sweden)

    Liviu Mihai SIMA

    2009-11-01

    Full Text Available This paper presents a solution for the railway bridges monitoring based on the use of already existing equipments in the railway installations and some new equipments based on photo-elements, as well. This kind of equipments can function in continue and discontinuous regime, means of them tracking down if the bridge piles suffered movements by different reasons. This aspect can put in danger the safety of the circulation on that bridge.

  15. 21 CFR 872.3770 - Temporary crown and bridge resin.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Temporary crown and bridge resin. 872.3770 Section... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Prosthetic Devices § 872.3770 Temporary crown and bridge resin. (a) Identification. A temporary crown and bridge resin is a device composed of a material, such as...

  16. 49 CFR 237.71 - Determination of bridge load capacities.

    Science.gov (United States)

    2010-10-01

    ... capacity shall be determined. (g) Bridge load capacity may be expressed in terms of numerical values related to a standard system of bridge loads, but shall in any case be stated in terms of weight and...) Bridge load capacity may be expressed in terms of both normal and maximum load conditions. Operation of...

  17. Analysis of Biaxially Stressed Bridge Deck Plates

    DEFF Research Database (Denmark)

    Jönsson, Jeppe; Bondum, Tommi Højer

    2012-01-01

    The ultimate state analysis of bridge deck plates at the intersection zone between main girders and transverse beams is complicated by biaxial membrane stresses, which may be in compression or tension in either direction depending on the bridge configuration and the specific location. This paper...

  18. Study on bridge checking evaluation based on deformation-Stress data

    Science.gov (United States)

    Shi, Jing Xian; Cheng, Ying Jie

    2018-06-01

    Bridge structure plays a very important role in human traffic. The evaluation of bridge structure after a certain period of operation has always been the focus of the bridge. Based on the data collected from the health inspection system of a continuous rigid frame bridge on a highway in Yunnan, China, it is found that there is a certain linear relationship between the deformation and stress of the bridge structure. In view of a specific section of the structure, the stress value of this section can be derived according to its deformation value. The coefficient K can be calculated by comparing the estimated value to the actual measured value. According to the range of the K value, the structural state of the bridge can be evaluated to a certain extent.

  19. Spin-accumulation effect in magnetic nano-bridge

    International Nuclear Information System (INIS)

    Khvalkovskii, A.V.; Zvezdin, A.A.; Zvezdin, K.A.; Pullini, D.; Perlo, P.

    2004-01-01

    Large values of magnetoresistance experimentally observed in magnetic nano-contacts and nano-wires are explained in terms of spin accumulation. The investigation of the spin-accumulation effect in magnetic nano-contacts (Phys. Rev. Lett. 82 (1999) 2923) and nano-bridges (JETP Lett. 75 (10) (2002) 613), which are considered to be very promising for various spintronic applications, is presented. The two-dimensional spin-diffusion problem in a magnetic nano-bridge is solved. Dependences of the specific resistance of the domain wall and of the distribution of non-equilibrium spin density on the nano-bridge geometry and the material parameters are obtained

  20. Nonlinear seismic analysis of continuous RC bridge

    Directory of Open Access Journals (Sweden)

    Čokić Miloš M.

    2017-01-01

    Full Text Available Nonlinear static analysis, known as a pushover method (NSPA is oftenly used to study the behaviour of a bridge structure under the seismic action. It is shown that the Equivalent Linearization Method - ELM, recommended in FEMA 440, is appropriate for the response analysis of the bridge columns, with different geometric characteristics, quantity and distribution of steel reinforcement. The subject of analysis is a bridge structure with a carriageway plate - a continuous beam with three spans, with the 24 + 40 + 24 m range. Main girder is made of prestressed concrete and it has a box cross section of a constant height. It is important to study the behaviour, not only in the transverse, but also in the longitudinal direction of the bridge axis, when analysing the bridge columns exposed to horizontal seismic actions. The columns were designed according to EN1992, parts 1 and 2. Seismic action analysis is conducted according to EN 1998: 2004 standard. Response spectrum type 1, for the ground type B, was applied and the analysis also includes 20% of traffic load. The analysis includes the values of columns displacement and ductility. To describe the behaviour of elements under the earthquake action in both - longitudinal and transverse direction, pushover curves were formed.

  1. 33 CFR 401.51 - Signaling approach to a bridge.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Signaling approach to a bridge... approach to a bridge. (a) Unless a vessel's approach has been recognized by a flashing signal, the master shall signal the vessel's presence to the bridge operator by VHF radio when it comes abreast of any of...

  2. Evaluation of fleet management techniques for timber highway bridges

    Science.gov (United States)

    Brent M. Phares; Travis K. Hosteng; Justin Dahlberg; Michael A. Ritter

    2011-01-01

    The general condition of the nation's bridges presents a complex management issue when considering cost, safety, and time. Consequently, the management of those bridges can become an overwhelming task. The need for a management system that is specific to rural systems may help to improve the management of this significant number of bridges. Although individual...

  3. Seismic retrofit of spliced sleeve connections for precast bridge piers.

    Science.gov (United States)

    2017-03-01

    Grouted Splice Sleeve (GSS) connectors are being considered for connecting bridge columns, footings, and pier caps in Accelerated Bridge Construction (ABC). A repair technique for precast reinforced concrete bridge column-to-footing and column-to-pie...

  4. Exploring of PST-TBPM in Monitoring Bridge Dynamic Deflection in Vibration

    Science.gov (United States)

    Zhang, Guojian; Liu, Shengzhen; Zhao, Tonglong; Yu, Chengxin

    2018-01-01

    This study adopts digital photography to monitor bridge dynamic deflection in vibration. Digital photography used in this study is based on PST-TBPM (photographing scale transformation-time baseline parallax method). Firstly, a digital camera is used to monitor the bridge in static as a zero image. Then, the digital camera is used to monitor the bridge in vibration every three seconds as the successive images. Based on the reference system, PST-TBPM is used to calculate the images to obtain the bridge dynamic deflection in vibration. Results show that the average measurement accuracies are 0.615 pixels and 0.79 pixels in X and Z direction. The maximal deflection of the bridge is 7.14 pixels. PST-TBPM is valid in solving the problem-the photographing direction not perpendicular to the bridge. Digital photography used in this study can assess the bridge health through monitoring the bridge dynamic deflection in vibration. The deformation trend curves depicted over time also can warn the possible dangers.

  5. Electrochemically-gated single-molecule electrical devices

    International Nuclear Information System (INIS)

    Guo, Shaoyin; Artés, Juan Manuel; Díez-Pérez, Ismael

    2013-01-01

    In the last decade, single-molecule electrical contacts have emerged as a new experimental platform that allows exploring charge transport phenomena in individual molecular blocks. This novel tool has evolved into an essential element within the Molecular Electronics field to understand charge transport processes in hybrid (bio)molecule/electrode interfaces at the nanoscale, and prospect the implementation of active molecular components into functional nanoscale optoelectronic devices. Within this area, three-terminal single-molecule devices have been sought, provided that they are highly desired to achieve full functionality in logic electronic circuits. Despite the latest experimental developments offer consistent methods to bridge a molecule between two electrodes (source and drain in a transistor notation), placing a third electrode (gate) close to the single-molecule electrical contact is still technically challenging. In this vein, electrochemically-gated single-molecule devices have emerged as an experimentally affordable alternative to overcome these technical limitations. In this review, the operating principle of an electrochemically-gated single-molecule device is presented together with the latest experimental methodologies to built them and characterize their charge transport characteristics. Then, an up-to-date comprehensive overview of the most prominent examples will be given, emphasizing on the relationship between the molecular structure and the final device electrical behaviour

  6. Bridge Failure Due to Inadequate Design of Bed Protection

    Science.gov (United States)

    Gupta, Yogita; Kaur, Suneet; Dindorkar, Nitin

    2017-12-01

    The shallow foundation is generally provided on non-erodible strata or where scour depth is less. It is also preferable for low perennial flow or standing water condition. In the present case study shallow foundation is adopted for box type bridge. The total length of the bridge is 132.98 m, consisting of eight unit of RCC box. Each unit is composed of three cell box. The bottom slab of box unit is acted as raft foundation, founded 500 mm below ground level. River bed protection work is provided on both upstream and downstream side along the whole length of the bridge as it is founded above scour level. The bridge collapsed during the monsoon just after two years of service. The present paper explains the cause of failure. This study on failure of the bridge illustrates the importance of bridge inspection before and after monsoon period and importance of the timely maintenance. Standard specifications of Indian Road Congress for the river bed protection work are also included.

  7. Application of superconducting coils to VAR control in electric power systems: a proposal

    International Nuclear Information System (INIS)

    Boenig, H.J.; Hassenzahl, W.V.

    1979-11-01

    During the last eight years, static VAR-control systems with thyristor-controlled, room-temperature reactors have been used in electrical systems for voltage control and system stabilization. In this proposal, we describe a new static VAR-control system that uses an asymmetrically controlled Graetz bridge and a superconducting dc coil. Preliminary studies indicate that the proposed system will have lower overall losses and that its capital cost and electrical characteristics are comparable to those of a conventional system. Three- and four-year programs for developing the electronic circuitry and superconducting coils for VAR control, culminating in the installation and testing of an approx. 40-MVAR system, are proposed

  8. Behavioral study of selected microorganisms in an aqueous electrohydrodynamic liquid bridge.

    Science.gov (United States)

    Paulitsch-Fuchs, Astrid H; Zsohár, Andrea; Wexler, Adam D; Zauner, Andrea; Kittinger, Clemens; de Valença, Joeri; Fuchs, Elmar C

    2017-07-01

    An aqueous electrohydrodynamic (EHD) floating liquid bridge is a unique environment for studying the influence of protonic currents (mA cm -2 ) in strong DC electric fields (kV cm -1 ) on the behavior of microorganisms. It forms in between two beakers filled with water when high-voltage is applied to these beakers. We recently discovered that exposure to this bridge has a stimulating effect on Escherichia coli. . In this work we show that the survival is due to a natural Faraday cage effect of the cell wall of these microorganisms using a simple 2D model. We further confirm this hypothesis by measuring and simulating the behavior of Bacillus subtilis subtilis , Neochloris oleoabundans, Saccharomyces cerevisiae and THP-1 monocytes. Their behavior matches the predictions of the model: cells without a natural Faraday cage like algae and monocytes are mostly killed and weakened, whereas yeast and Bacillus subtilis subtilis survive. The effect of the natural Faraday cage is twofold: First, it diverts the current from passing through the cell (and thereby killing it); secondly, because it is protonic it maintains the osmotic pressure in the cell wall, thereby mitigating cytolysis which would normally occur due to the low osmotic pressure of the surrounding medium. The method presented provides the basis for selective disinfection of solutions containing different microorganisms.

  9. Behavioral study of selected microorganisms in an aqueous electrohydrodynamic liquid bridge

    Directory of Open Access Journals (Sweden)

    Astrid H. Paulitsch-Fuchs

    2017-07-01

    Full Text Available An aqueous electrohydrodynamic (EHD floating liquid bridge is a unique environment for studying the influence of protonic currents (mA cm−2 in strong DC electric fields (kV cm−1 on the behavior of microorganisms. It forms in between two beakers filled with water when high-voltage is applied to these beakers. We recently discovered that exposure to this bridge has a stimulating effect on Escherichia coli.. In this work we show that the survival is due to a natural Faraday cage effect of the cell wall of these microorganisms using a simple 2D model. We further confirm this hypothesis by measuring and simulating the behavior of Bacillus subtilis subtilis, Neochloris oleoabundans, Saccharomyces cerevisiae and THP-1 monocytes. Their behavior matches the predictions of the model: cells without a natural Faraday cage like algae and monocytes are mostly killed and weakened, whereas yeast and Bacillus subtilis subtilis survive. The effect of the natural Faraday cage is twofold: First, it diverts the current from passing through the cell (and thereby killing it; secondly, because it is protonic it maintains the osmotic pressure in the cell wall, thereby mitigating cytolysis which would normally occur due to the low osmotic pressure of the surrounding medium. The method presented provides the basis for selective disinfection of solutions containing different microorganisms.

  10. Off-pump supra-arterial myotomy for myocardial bridging.

    Science.gov (United States)

    Crespo, Alejandro; Aramendi, José I; Hamzeh, Gadah; Voces, Roberto

    2008-09-01

    We report the results of surgery and midterm outcome in two patients with symptomatic myocardial bridging who underwent off-pump supra-arterial myotomy. Both patients were operated upon through a median sternotomy. The anterior wall of the heart was exposed in the same manner as in off-pump CABG. The left anterior descending coronary artery is unroofed from its myocardial bridge with the aid of a heart stabilizer and a blower. Neither heparin nor blood transfusion was required. Both patients survived the operation and are asymptomatic. Postoperative coronary angiogram showed good resolution of the muscle bridge in one patient. We conclude that in symptomatic patients with myocardial bridging despite medical therapy, surgical myotomy can be considered an adequate therapy. It can be safely done off-pump.

  11. A Wireless Sensor Network with Enhanced Power Efficiency and Embedded Strain Cycle Identification for Fatigue Monitoring of Railway Bridges

    OpenAIRE

    Feltrin, Glauco; Popovic, Nemanja; Flouri, Kallirroi; Pietrzak, Piotr

    2016-01-01

    Wireless sensor networks have been shown to be a cost-effective monitoring tool for many applications on civil structures. Strain cycle monitoring for fatigue life assessment of railway bridges, however, is still a challenge since it is data intensive and requires a reliable operation for several weeks or months. In addition, sensing with electrical resistance strain gauges is expensive in terms of energy consumption. The induced reduction of battery lifetime of sensor nodes increases the mai...

  12. The Seismic Response of High-Speed Railway Bridges Subjected to Near-Fault Forward Directivity Ground Motions Using a Vehicle-Track-Bridge Element

    Directory of Open Access Journals (Sweden)

    Chen Ling-kun

    2014-01-01

    Full Text Available Based on the Next Generation Attenuation (NGA project ground motion library, the finite element model of the high-speed railway vehicle-bridge system is established. The model was specifically developed for such system that is subjected to near-fault ground motions. In addition, it accounted for the influence of the rail irregularities. The vehicle-track-bridge (VTB element is presented to simulate the interaction between train and bridge, in which a train can be modeled as a series of sprung masses concentrated at the axle positions. For the short period railway bridge, the results from the case study demonstrate that directivity pulse effect tends to increase the seismic responses of the bridge compared with far-fault ground motions or nonpulse-like motions and the directivity pulse effect and high values of the vertical acceleration component can notably influence the hysteretic behaviour of piers.

  13. Design and erection of the MUSEUM BRIDGE; Bijutsu no sekai eno yume no kakehashi. MUSEUM BRIDGE no sekkei seko

    Energy Technology Data Exchange (ETDEWEB)

    Ishihara, S.; Tsunekawa, M.; Umda, A.; Kishimoto, Y.; Yotsukura, Y.; Miitsu, K.; Okada, S.; Furukawa, M. [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

    1998-12-20

    MUSEUM Projects for the religious corporation of Shinji-Shumeikai, at Shigaraki, Shiga prefecture. Fundamental design was by a project team led by the world-famous architect I.M. Pei. The museum is located in a prefectural park surrounded by forests. The design concept of the bridge aimed to connect Shangri-La (museum) to the real world. In order to satisfy this purpose, a cable-stayed bridge with external tendon was adopted as an original structure style, and details such as handrails, gratings, and gloss painting taken into consideration. The authors report the characteristics of the bridge and the sequence of erection. (author)

  14. Comparison of radiological and morphologic assessments of myocardial bridges.

    Science.gov (United States)

    Ercakmak, Burcu; Bulut, Elif; Hayran, Mutlu; Kaymaz, Figen; Bilgin, Selma; Hazirolan, Tuncay; Bayramoglu, Alp; Erbil, Mine

    2015-09-01

    In this study we aimed to compare the findings of coronary dual-source computed tomography angiography of myocardial bridges with cadaveric dissections. Forty-one isolated, non-damaged fresh sheep hearts were used in this study. Myocardial bridges of the anterior interventricular branch of the left coronary artery were demonstrated and analyzed by a coronary dual-source computed tomography angiography. Dissections along the left anterior interventricular branch of the left coronary artery were performed by using Zeiss OPMI pico microscope and the length of the bridges were measured. The depths of the myocardial bridges were measured from the stained sections by using the light microscope (Leica DM 6000B). MBs were found in all 41 hearts (100%) during dissections. Dual-source computed tomography angiography successfully detected 87.8% (36 of the 41 hearts) of the myocardial bridges measured on left anterior interventricular branch of left coronary artery. The lengths of the myocardial bridges were found 5-40 and 8-50 mm with dissection and dual-source computed tomography angiography, respectively. And the depths were found 0.7-4.5 mm by dual-source computed tomography angiography and 0.745-4.632 mm morphologically. Comparison of the mean values of the lengths showed statistically significantly higher values (22.0 ± 8.5, 17.7 ± 7.7 mm, p = 0.003) for the dissections. Radiological assessment also effectively discriminated complete bridges from incomplete ones. Our study showed that coronary computed tomography angiography is reliable in evaluating the presence and depth of myocardial bridges.

  15. Bridge condition assessment based on long-term strain monitoring

    Science.gov (United States)

    Sun, LiMin; Sun, Shouwang

    2011-04-01

    In consideration of the important role that bridges play as transportation infrastructures, their safety, durability and serviceability have always been deeply concerned. Structural Health Monitoring Systems (SHMS) have been installed to many long-span bridges to provide bridge engineers with the information needed in making rational decisions for maintenance. However, SHMS also confronted bridge engineers with the challenge of efficient use of monitoring data. Thus, methodologies which are robust to random disturbance and sensitive to damage become a subject on which many researches in structural condition assessment concentrate. In this study, an innovative probabilistic approach for condition assessment of bridge structures was proposed on the basis of long-term strain monitoring on steel girder of a cable-stayed bridge. First, the methodology of damage detection in the vicinity of monitoring point using strain-based indices was investigated. Then, the composition of strain response of bridge under operational loads was analyzed. Thirdly, the influence of temperature and wind on strains was eliminated and thus strain fluctuation under vehicle loads is obtained. Finally, damage evolution assessment was carried out based on the statistical characteristics of rain-flow cycles derived from the strain fluctuation under vehicle loads. The research conducted indicates that the methodology proposed is qualified for structural condition assessment so far as the following respects are concerned: (a) capability of revealing structural deterioration; (b) immunity to the influence of environmental variation; (c) adaptability to the random characteristic exhibited by long-term monitoring data. Further examination of the applicability of the proposed methodology in aging bridge may provide a more convincing validation.

  16. Bridging the Gaps.

    Science.gov (United States)

    Netzer, Greg

    1995-01-01

    Discusses a model water quality monitoring project, Project Bridge, established to train minority girls about to enter eighth grade in scientific procedures followed by hands-on experimentation. Students spent a week monitoring water in an urban stream and analyzing results. (LZ)

  17. Altered cross-bridge properties in skeletal muscle dystrophies

    Directory of Open Access Journals (Sweden)

    Aziz eGuellich

    2014-10-01

    Full Text Available Force and motion generated by skeletal muscle ultimately depends on the cyclical interaction of actin with myosin. This mechanical process is regulated by intracellular Ca2+ through the thin filament-associated regulatory proteins i.e.; troponins and tropomyosin. Muscular dystrophies are a group of heterogeneous genetic affections characterized by progressive degeneration and weakness of the skeletal muscle as a consequence of loss of muscle tissue which directly reduces the number of potential myosin cross-bridges involved in force production. Mutations in genes responsible for skeletal muscle dystrophies have been shown to modify the function of contractile proteins and cross-bridge interactions. Altered gene expression or RNA splicing or post-translational modifications of contractile proteins such as those related to oxidative stress, may affect cross-bridge function by modifying key proteins of the excitation-contraction coupling. Micro-architectural change in myofilament is another mechanism of altered cross-bridge performance. In this review, we provide an overview about changes in cross-bridge performance in skeletal muscle dystrophies and discuss their ultimate impacts on striated muscle function.

  18. Cable-stayed PC bridge with inclined main tower. Hachinohe port island bridge; Keisha shuto to yusuru 2 keikan renzoku PC shachokyo. Hachinoheko port island renrakykyo (kasho)

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, A. [Hachinohe Institute of Technology, Aomori (Japan)

    1994-09-15

    The design and construction of the inclined main bridge, which is being constructed at the mouth of the Hachinohe Harbor (in Japan), are outlined in this paper. This connecting bridge has an overall length of 265.56 m, and consists of the main bridge member of asymmetric 2 cable-stayed PC bridge and the 3 cable-stayed PC box member bridge. An asymmetric design was employed for the main bridge frame to ensure the access space for small ships passing between bridge girders, easy maintenance and service, improved economy, and excellent view. The main tower is a single-pillar reinforced concrete structure with an inclination of 15{degree} and 47 m in height. Forty-eight diagonal cables are arranged so that 12 cable trains are connected to the main tower on the right and left sides respectively, and the back-stay cable structure is used for each upper 3 cable trains to improve safety against the earthquake. The main beam is made by a prestressed concrete structure with inverse trapezoidal 3-chamber frame section. This structure is superior in increasing the safety against wind. Steel tube sheet-pile well is selected for the bridge pier base, and debris layer is selected as a support layer for the base. For the construction of the lower bridge section, sand conversion through predrilling of rubble-mound and debris layer was executed. The underwater non-separative concrete and embedded type frame are used around the bridge piers and its surrounding. For the construction of the upper bridge section, steel frames are used inside the main tower to ensure the construction precision. 7 figs.

  19. Bridges Over Troubled Waters: Theoretical Linguistics And ...

    African Journals Online (AJOL)

    This paper tries to construct a bridge between the concerns of theoretical linguistics and those of multilingualism and code-switching (CS) research. It argues that the primary special point of interaction between these fields lies in the question of potential equivalence between elements or categories, bridging across ...

  20. A bridge network maintenance framework for Pareto optimization of stakeholders/users costs

    International Nuclear Information System (INIS)

    Orcesi, Andre D.; Cremona, Christian F.

    2010-01-01

    For managing highway bridges, stakeholders require efficient and practical decision making techniques. In a context of limited bridge management budget, it is crucial to determine the most effective breakdown of financial resources over the different structures of a bridge network. Bridge management systems (BMSs) have been developed for such a purpose. However, they generally rely on an individual approach. The influence of the position of bridges in the transportation network, the consequences of inadequate service for the network users, due to maintenance actions or bridge failure, are not taken into consideration. Therefore, maintenance strategies obtained with current BMSs do not necessarily lead to an optimal level of service (LOS) of the bridge network for the users of the transportation network. Besides, the assessment of the structural performance of highway bridges usually requires the access to the geometrical and mechanical properties of its components. Such information might not be available for all structures in a bridge network for which managers try to schedule and prioritize maintenance strategies. On the contrary, visual inspections are performed regularly and information is generally available for all structures of the bridge network. The objective of this paper is threefold (i) propose an advanced network-level bridge management system considering the position of each bridge in the transportation network, (ii) use information obtained at visual inspections to assess the performance of bridges, and (iii) compare optimal maintenance strategies, obtained with a genetic algorithm, when considering interests of users and bridge owner either separately as conflicting criteria, or simultaneously as a common interest for the whole community. In each case, safety and serviceability aspects are taken into account in the model when determining optimal strategies. The theoretical and numerical developments are applied on a French bridge network.

  1. Finite element modelling for fatigue stress analysis of large suspension bridges

    Science.gov (United States)

    Chan, Tommy H. T.; Guo, L.; Li, Z. X.

    2003-03-01

    Fatigue is an important failure mode for large suspension bridges under traffic loadings. However, large suspension bridges have so many attributes that it is difficult to analyze their fatigue damage using experimental measurement methods. Numerical simulation is a feasible method of studying such fatigue damage. In British standards, the finite element method is recommended as a rigorous method for steel bridge fatigue analysis. This paper aims at developing a finite element (FE) model of a large suspension steel bridge for fatigue stress analysis. As a case study, a FE model of the Tsing Ma Bridge is presented. The verification of the model is carried out with the help of the measured bridge modal characteristics and the online data measured by the structural health monitoring system installed on the bridge. The results show that the constructed FE model is efficient for bridge dynamic analysis. Global structural analyses using the developed FE model are presented to determine the components of the nominal stress generated by railway loadings and some typical highway loadings. The critical locations in the bridge main span are also identified with the numerical results of the global FE stress analysis. Local stress analysis of a typical weld connection is carried out to obtain the hot-spot stresses in the region. These results provide a basis for evaluating fatigue damage and predicting the remaining life of the bridge.

  2. Biomechanical Comparison of Modified Suture Bridge Using Rip-Stop versus Traditional Suture Bridge for Rotator Cuff Repair

    Directory of Open Access Journals (Sweden)

    ZiYing Wu

    2016-01-01

    Full Text Available Purpose. To compare the biomechanical properties of 3 suture-bridge techniques for rotator cuff repair. Methods. Twelve pair-matched fresh-frozen shoulder specimens were randomized to 3 groups of different repair types: the medially Knotted Suture Bridge (KSB, the medially Untied Suture Bridge (USB, and the Modified Suture Bridge (MSB. Cyclic loading and load-to-failure test were performed. Parameters of elongation, stiffness, load at failure, and mode of failure were recorded. Results. The MSB technique had the significantly greatest load to failure (515.6±78.0 N, P=0.04 for KSB group; P<0.001 for USB group, stiffness (58.0±10.7 N/mm, P=0.005 for KSB group; P<0.001 for USB group, and lowest elongation (1.49±0.39 mm, P=0.009 for KSB group; P=0.001 for USB group among 3 groups. The KSB repair had significantly higher ultimate load (443.5±65.0 N than USB repair (363.5±52.3 N, P=0.024. However, there was no statistical difference in stiffness and elongation between KSB and USB technique (P=0.396 for stiffness and P=0.242 for elongation, resp.. The failure mode for all specimens was suture pulling through the cuff tendon. Conclusions. Our modified suture bridge technique (MSB may provide enhanced biomechanical properties when compared with medially knotted or knotless repair. Clinical Relevance. Our modified technique may represent a promising alternative in arthroscopic rotator cuff repair.

  3. Computer modeling of road bridge for simulation moving load

    Directory of Open Access Journals (Sweden)

    Miličić Ilija M.

    2016-01-01

    Full Text Available In this paper is shown computational modelling one span road structures truss bridge with the roadway on the upper belt of. Calculation models were treated as planar and spatial girders made up of 1D finite elements with applications for CAA: Tower and Bridge Designer 2016 (2nd Edition. The conducted computer simulations results are obtained for each comparison of the impact of moving load according to the recommendations of the two standards SRPS and AASHATO. Therefore, it is a variant of the bridge structure modeling application that provides Bridge Designer 2016 (2nd Edition identical modeled in an environment of Tower. As important information for the selection of a computer applications point out that the application Bridge Designer 2016 (2nd Edition we arent unable to treat the impacts moving load model under national standard - V600. .

  4. Ex Vivo Assay of Electrical Stimulation to Rat Sciatic Nerves: Cell Behaviors and Growth Factor Expression.

    Science.gov (United States)

    Du, Zhiyong; Bondarenko, Olexandr; Wang, Dingkun; Rouabhia, Mahmoud; Zhang, Ze

    2016-06-01

    Neurite outgrowth and axon regeneration are known to benefit from electrical stimulation. However, how neuritis and their surroundings react to electrical field is difficult to replicate by monolayer cell culture. In this work freshly harvested rat sciatic nerves were cultured and exposed to two types of electrical field, after which time the nerve tissues were immunohistologically stained and the expression of neurotrophic factors and cytokines were evaluated. ELISA assay was used to confirm the production of specific proteins. All cell populations survived the 48 h culture with little necrosis. Electrical stimulation was found to accelerate Wallerian degeneration and help Schwann cells to switch into migratory phenotype. Inductive electrical stimulation was shown to upregulate the secretion of multiple neurotrophic factors. Cellular distribution in nerve tissue was altered upon the application of an electrical field. This work thus presents an ex vivo model to study denervated axon in well controlled electrical field, bridging monolayer cell culture and animal experiment. It also demonstrated the critical role of electrical field distribution in regulating cellular activities. © 2015 Wiley Periodicals, Inc.

  5. NHDOT : process for municipally-managed state bridge aid program projects

    Science.gov (United States)

    2007-09-12

    The document sets for the requirements for a municipality which to manage the design and construction of a bridge rehabilitation or replacement project and receive Bridge Aid under the applicable provisions of RSA 234. Bridge Aid provided to a Munici...

  6. The Wien Bridge Oscillator Family

    DEFF Research Database (Denmark)

    Lindberg, Erik

    2006-01-01

    A tutorial in which the Wien bridge family of oscillators is defined and investigated. Oscillators which do not fit into the Barkhausen criterion topology may be designed. A design procedure based on initial complex pole quality factor is reported. The dynamic transfer characteristic of the ampli......A tutorial in which the Wien bridge family of oscillators is defined and investigated. Oscillators which do not fit into the Barkhausen criterion topology may be designed. A design procedure based on initial complex pole quality factor is reported. The dynamic transfer characteristic...

  7. Interaction between rivers and bridges in Tuscany (Italy)

    Science.gov (United States)

    Tartaglia, V.; Caporali, E.

    2003-04-01

    The natural adjustment phenomena of the rivers next to the crossing infrastructures, often due to the interaction with the structures themselves, cause damage risk conditions for a high number of structures. About 30 railway bridge sites in Tuscany, interested in the last 30 years by river bed instability, have been monitored. A standardized Bridge Site Inspection Form have been defined and used for the inspections to ensure data reliability and a computer-aided system for data collection have been developed. The system is composed by two components: (1) a GIS that contain the hydrological and geomorphological data layers; (2) a DBMS on which the geomorphological characteristics of the sites and the geometrical and structural characteristics of the bridges are stored with a relational structure. The observed damage mechanisms suggest to schematise the bridge-river interaction as the sum of two instability processes: (a) the lateral instability, when long term evolution of the stream or localized collapse phenomena of the banks can undermine the lateral bridge structures not meant to be exposed to flow (piers whit shallow foundation in the floodplain, long abutments, etc.); (b) vertical instability processes, when the river bed level degradation given by the sum of geomorphological phenomena at the basin scale (general scour) and at the site scale (contraction scour and local scour) can undermine the bridge foundations. To express synthetically the damage risk of bridges, due to instability phenomena of their crossed rivers, the use of a Risk Index is here proposed. The RI is calculated with a semi-qualitative method derived from the geomorphological observations and from the calculated values of some hydraulic variables, obtained by the regional frequency analysis of flood in Tuscany. The RI allows, even in lack of foundation depth data, to individuate the critical sites and to rank them for protection planning. Besides a threshold value of the Risk Index has been

  8. Einstein-Rosen 'bridge' needs lightlike brane source

    International Nuclear Information System (INIS)

    Guendelman, Eduardo; Kaganovich, Alexander; Nissimov, Emil; Pacheva, Svetlana

    2009-01-01

    The Einstein-Rosen 'bridge' wormhole solution proposed in the classic paper (Einstein and Rosen (1935) ) does not satisfy the vacuum Einstein equations at the wormhole throat. We show that the fully consistent formulation of the original Einstein-Rosen 'bridge' requires solving Einstein equations of bulk D=4 gravity coupled to a lightlike brane with a well-defined world-volume action. The non-vanishing contribution of Einstein-Rosen 'bridge' solution to the right-hand side of Einstein equations at the throat matches precisely the surface stress-energy tensor of the lightlike brane which automatically occupies the throat ('horizon straddling') - a feature triggered by the world-volume lightlike brane dynamics.

  9. Building the Clinical Bridge: An Australian Success

    Directory of Open Access Journals (Sweden)

    Marianne Wallis

    2012-01-01

    Full Text Available Nursing effectiveness science includes primary, secondary, and translational, clinically focused research activities which aim to improve patient or client outcomes. It is imperative, for the successful conduct of a program of nursing effectiveness science, that a clinical bridge is established between academic and healthcare service facilities. An Australian example of the development of a robust clinical bridge through the use of jointly funded positions at the professorial level is outlined. In addition, an analysis of the practical application of Lewin’s model of change management and the contribution of both servant and transformational leadership styles to the bridge building process is provided.

  10. Evaluation of streambed scour at bridges over tidal waterways in Alaska

    Science.gov (United States)

    Conaway, Jeffrey S.; Schauer, Paul V.

    2012-01-01

    The potential for streambed scour was evaluated at 41 bridges that cross tidal waterways in Alaska. These bridges are subject to several coastal and riverine processes that have the potential, individually or in combination, to induce streambed scour or to damage the structure or adjacent channel. The proximity of a bridge to the ocean and water-surface elevation and velocity data collected over a tidal cycle were criteria used to identify the flow regime at each bridge, whether tidal, riverine, or mixed, that had the greatest potential to induce streambed scour. Water-surface elevations measured through at least one tide cycle at 32 bridges were correlated to water levels at the nearest tide station. Asymmetry of the tidal portion of the hydrograph during the outgoing tide at 12 bridges indicated that riverine flows were stored upstream of the bridge during the tidal exchange. This scenario results in greater discharges and velocities during the outgoing tide compared to those on the incoming tide. Velocity data were collected during outgoing tides at 10 bridges that experienced complete flow reversals, and measured velocities during the outgoing tide exceeded the critical velocity required to initiate sediment transport at three sites. The primary risk for streambed scour at most of the sites considered in this study is from riverine flows rather than tidal fluctuations. A scour evaluation for riverine flow was completed at 35 bridges. Scour from riverine flow was not the primary risk for six tidally-controlled bridges and therefore not evaluated at those sites. Field data including channel cross sections, a discharge measurement, and a water-surface slope were collected at the 35 bridges. Channel instability was identified at 14 bridges where measurable scour and or fill were noted in repeated surveys of channel cross sections at the bridge. Water-surface profiles for the 1-percent annual exceedance probability discharge were calculated by using the Hydrologic

  11. Planar Hall effect bridge magnetic field sensors

    DEFF Research Database (Denmark)

    Henriksen, A.D.; Dalslet, Bjarke Thomas; Skieller, D.H.

    2010-01-01

    Until now, the planar Hall effect has been studied in samples with cross-shaped Hall geometry. We demonstrate theoretically and experimentally that the planar Hall effect can be observed for an exchange-biased ferromagnetic material in a Wheatstone bridge topology and that the sensor signal can...... Hall effect bridge sensors....

  12. U.S. Geological Survey - Virginia Department of Transportation: Bridge scour pilot study

    Science.gov (United States)

    Austin, Samuel H.

    2018-02-27

    BackgroundCost effective and safe highway bridge designs are required to ensure the long-term sustainability of Virginia’s road systems. The streamflows that, over time, scour streambed sediments from bridge piers inherently affect bridge safety and design costs. To ensure safety, bridge design must anticipate streambed scour at bridge piers over the lifespan of a bridge. Until recently Federal Highway Administration (FHWA) guidance provided only for scour estimates of granular, noncohesive, highly erosive material yielding overestimates of scour potential in instances when streambed materials offer some resistance to scour. This study seeks to estimate stream power and streambed scour for these more resistive sites, with bridge piers potentially established in cohesive soil or erodible rock. This new knowledge may provide significant construction cost savings while ensuring design and construction of safe highway bridges.

  13. Response estimation for a floating bridge using acceleration output only

    NARCIS (Netherlands)

    Petersen, Øyvind Wiig; Øiseth, Ole; Nord, Torodd Skjerve; Lourens, E.; Sas, P.; Moens, D.; van de Walle, A.

    2016-01-01

    The Norwegian Public Roads Administration is reviewing the possibility of using floating bridges as fjord crossings. The dynamic behaviour of very long floating bridges with novel designs are prone to uncertainties. Studying the dynamic behaviour of existing bridges is valuable for understanding

  14. Electricity from bagasse in Zimbabwe

    International Nuclear Information System (INIS)

    Mbohwa, C.; Fukuda, S.

    2003-01-01

    Zimbabwe has suffered electrical power shortages resulting in electrical energy imports rising to between 40% and 50% of total energy needs. Electricity generation capacity has stagnated at around 2000 Megawatts (MW e ) since 1985, when two thermal units totaling 440 MW e were completed at Hwange. The effective capacity is 1.75 GW e . The current plan is to increase capacity by installing 600 MW e at Hwange at a cost of at least US $ 600 million. Raising this level of capital is difficult hence over the last 15 years there has been a failure to increase capacity. This article is based on a study of bagasse cogeneration in Zimbabwe and Mauritius conducted over a two-year period. It discusses technology improvements that can be made in the sugar sector to improve process and energy efficiency for the purposes of becoming an independent power producer that supplies power to the grid continuously throughout the year. Power plant investment in the sugar industry offers a bridging and realizable alternative for electricity generation in Zimbabwe. Investment in a 35 MW e bagasse (moisturized fiber left when sugar has been extracted from sugarcane) system would require a capital of about US$ 35 million using modern technology based on experiences in Mauritius and Reunion. A technical and economic evaluation and analysis reveals that bagasse power development is technically and economically feasible if electricity is priced at the long-term marginal cost. At current import prices, financial assistance from the global environment facility and/or the clean development mechanism of the Kyoto protocol would be necessary. The solving of the current political and economic problems in the country would pave the way for attracting a technical partner and development, of bagasse power using domestic and international financing

  15. Critical traffic loading for the design of prestressed concrete bridge

    International Nuclear Information System (INIS)

    Hassan, M.I.U.

    2009-01-01

    A study has been carried out to determine critical traffic loadings for the design of bridge superstructures. The prestressed concrete girder bridge already constructed in Lahore is selected for the analysis as an example. Standard traffic loadings according to AASHTO (American Association of State Highway and Transportation Officials) and Pakistan Highway Standards are used for this purpose. These include (1) HL-93 Truck, (2) Lane and (3) Tandem Loadings in addition to (4) Military tank loading, (5) Class-A, (6) Class-B and (7) Class-AA loading, (8) NLC (National Logistic Cell) and (9) Volvo truck loadings. Bridge superstructure including transom beam is analyzed Using ASD and LRFD (Load and Resistance Factor Design) provisions of AASHTO specifications. For the analysis, two longer and shorter spans are selected. This includes the analysis of bridge deck; interior and exterior girder; a typical transom beam and a pier. Dead and live loading determination is carried out using both computer aided and manual calculations. Evaluation of traffic loadings is done for all the bridge components to find out the critical loading. HL-93 loading comes out to be the most critical loading and where this loading is not critical in case of bridge decks; a factor of 1.15 is introduced to make it equivalent with HL-93 -Ioading. SAP-2000 (Structural Engineering Services of Pakistan) and MS-Excel is employed for analysis of bridge superstructure subjected to this loading. Internal forces are obtained for the structural elements of the bridge for all traffic loadings mentioned. It is concluded that HL-93 loading can be used for the design of prestressed concrete girder bridge. Bridge design authorities like NHA (National Highway Authority) and different cities development authorities are using different standard traffic loadings. A number of suggestions are made from the results of the research work related to traffic loadings and method of design. These recommendations may be

  16. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with substantial...

  17. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  18. Mathematical models for suspension bridges nonlinear structural instability

    CERN Document Server

    Gazzola, Filippo

    2015-01-01

    This work provides a detailed and up-to-the-minute survey of the various stability problems that can affect suspension bridges. In order to deduce some experimental data and rules on the behavior of suspension bridges, a number of historical events are first described, in the course of which several questions concerning their stability naturally arise. The book then surveys conventional mathematical models for suspension bridges and suggests new nonlinear alternatives, which can potentially supply answers to some stability questions. New explanations are also provided, based on the nonlinear structural behavior of bridges. All the models and responses presented in the book employ the theory of differential equations and dynamical systems in the broader sense, demonstrating that methods from nonlinear analysis can allow us to determine the thresholds of instability.

  19. Towards a real-time Structural Health Monitoring of railway bridges

    OpenAIRE

    Vagnoli, Matteo; Remenyte-Prescott, Rasa; Andrews, John

    2017-01-01

    More than 350,000 railway bridges are present on the European railway network, making them a key infrastructure of the whole railway network. Railway bridges are continuously exposed to changing environmental threats, such as wind, floods and traffic load, which can affect safety and reliability of the bridge. Furthermore, a problem on a bridge can affect the whole railway network by increasing the vulnerability of the geographic area, served by the railway network. In this paper a Bayesian B...

  20. RECONSTRUCTION AND REINFORCEMENT OF BRIDGE ACROSS THE RIVER. SYLVA IN KUNGUR, RUSSIA

    Directory of Open Access Journals (Sweden)

    R. Ye. Heizn

    2010-04-01

    Full Text Available Sylva Bridge at Kungur city is one of the oldest road bridges in Perm region, the West Urals, Russia. Its erection was begun in 1912 and was interrupted with the First World War and the further events in Russia. The bridge was opened only in 1931. For 75 years of bridge operation the most part of bridge constructions has been acquired plural damages, both mechanical and corrosion. After the bridge inspection in 2003 and according to the calculations of its capacity, the decision on reconstruction of the bridge was accepted. The purpose of rehabilitation was to replace the timber deck by steel orthotropic deck with asphalt pavement. A new deck was to be engaged in combined action with the existing metal structures with the help of socles with high-strength bolts. Due to this, the bridge carrying capacity was increased as required by the present standards. In 2006, after tests, the bridge was opened for traffic.