  1. Guidelines to restoring structural integrity of covered bridge members

    Science.gov (United States)

    Ronald W. Anthony

    2018-01-01

    These guidelines are designed for decision makers (selectmen, county commissioners, city planners, preservation officers, etc.) that have responsibility for repairing and maintaining existing covered bridges to help them understand what goes into making effective decisions about how, and when, to repair a covered bridge. The purpose of these guidelines is to present...

  2. AE characteristic for monitoring of fatigue crack in steel bridge members

    Science.gov (United States)

    Yoon, Dong-Jin; Jung, Juong-Chae; Park, Philip; Lee, Seung-Seok

    2000-06-01

    Acoustic emission technique was employed for the monitoring of crack activity in both steel bridge members and laboratory specimen. Laboratory experiment was carried out to identify AE characteristics of fatigue cracks for compact tension specimen. The relationship between a stress intensity factor and AE signals activity as well as conventional AE parameter analysis was discussed. A field test was also conducted on a railway bridge, which contain several fatigue cracks. Crack activities were investigated while in service with strain measurement. From the results, in the laboratory tests, the features of three parameters such as the length of crack growth, the AE energy, and the cumulative AE events, showed the almost same trend in their increase as the number of fatigue cycle increased. From the comparisons of peak amplitude and AE energy with stress intensity factor, it was verified that the higher stress intensity factors generated AE signals with higher peak amplitude and a large number of AE counts. In the field test, real crack propagation signals were captured and the crack activity was verified in two cases.

  3. Species Identification and Design Value Estimation of Wooden Members in Covered Bridges

    Science.gov (United States)

    Alex C. Wiedenhoeft; David E. Kretschmann

    2014-01-01

    Covered timber bridges are historic structures with unique aesthetic value. To preserve this value and maintain bridges in service, robust evaluation of their performance and safety is necessary. The strength of the timber found in covered bridges can vary considerably, not only because of age and condition, but also because of species and grade. For the practicing...

  4. Bridges

    NARCIS (Netherlands)

    Zant, W.

    2017-01-01

    We estimate to what extent bridges in Mozambique lead to transport cost reductions and attribute these reductions to key determinants, in particular road distance, road quality and crossing borders. For identification we exploit the introduction of a road bridge over the Zambezi river, in August

  5. BRIDGE OVER TROUBLED WATERS? THE MOST "CENTRAL" MEMBERS OF PSYCHOLOGY AND PHILOSOPHY ASSOCIATIONS CA. 1900.

    Science.gov (United States)

    Green, Christopher D; Heidari, Crystal; Chiacchia, Daniel; Martin, Shane M

    2016-07-01

    There are many different ways to assess the significance of historical figures. Often we look at the influence of their writings, or at the important offices they held with disciplinary institutions such as universities, journals, and scholarly societies. In this study, however, we took a novel approach: we took the complete memberships, ca. 1900, of four organizations-the American Psychological Association, the Western Philosophical Association, the American Philosophical Association, and the Southern Society for Philosophy and Psychology-and visualized them as a network. We then identified individuals who "bridged" between two or more of these groups and considered what might be termed their "centrality" to the psychological-philosophical community of their time. First, we examined these figures qualitatively, briefly describing their lives and careers. Then we approached the problem mathematically, considering several alternative technical realizations of "centrality" and then explaining our reasons for choosing eigenvector centrality as the best for our purposes. We found a great deal of overlap among the results of the qualitative and quantitative approaches, but also some telling differences. J. Mark Baldwin, Edward Buchner, Christine Ladd Franklin, and Frank Thilly consistently emerged as highly central figures. Some more marginal figures such as Max Meyer, and Frederick J. E. Woodbridge, Edward A. Pace, Edward H. Griffin played interesting roles as well. © 2016 Wiley Periodicals, Inc.

  6. Total Artificial Heart Implantation as a Bridge to Heart Transplantation in an Active Duty Service Member With Amyloid Cardiomyopathy.

    Science.gov (United States)

    Scully, Michael S; Wessman, Dylan E; McKee, James M; Francisco, Gregory M; Nayak, Keshav R; Kobashigawa, Jon A

    2017-03-01

    Cardiac involvement by light-chain (AL) amyloid occurs in up to 50% of patients with primary AL amyloidosis. The prognosis of amyloid heart disease is poor with 1-year survival rates of 35 to 40%. Historically, heart transplantation was considered controversial for patients with AL amyloid cardiomyopathy (CM) given the systemic nature of the disease and poor survival. We present a case report of an active duty service member diagnosed with advanced cardiac amyloid who underwent total artificial heart transplant as a bridge to heart transplant and eventual autologous stem cell transplant. A 47-year-old active duty male initially evaluated for atypical chest pain was found to have severe concentric left ventricular hypertrophy on echocardiogram but normal voltage on electrocardiogram. Cardiac magnetic resonance imaging, laboratory studies, and bone marrow biopsy established the diagnosis of cardiac amyloidosis. At the time of diagnosis, the patient's prognosis was very poor with a median survival of 5 months on the basis of the Mayo Clinic revised prognostic staging system for amyloidosis. The patient developed rapidly progressive left ventricular dysfunction and heart failure leading to cardiac arrest. The patient received a total artificial heart as a bridge to orthotopic heart and kidney transplantation and eventual stem cell transplant. He continues to be in remission and has a fair functional capacity without restriction in activities of daily living or moderate exercise. Amyloid CM is a rare and devastating disease. The natural course of the disease has made heart transplant in these patients controversial. Modern advancements in chemotherapies and advanced heart failure treatments have improved outcomes for select patients with AL amyloid CM undergoing heart transplantation. There is ongoing research seeking improvement in treatment options and outcomes for patients with this deadly disease. Reprint & Copyright © 2017 Association of Military Surgeons of the U.S.

  7. Trinuclear ruthenium dioxolene complexes based on the bridging ligand hexahydroxytriphenylene: electrochemistry, spectroscopy, and near-infrared electrochromic behaviour associated with a reversible seven-membered redox chain.

    Science.gov (United States)

    Grange, Christopher S; Meijer, Anthony J H M; Ward, Michael D

    2010-01-07

    The trinuclear complexes [{(R2bipy)2Ru}3(mu3-HHTP)](PF6)3 [1(PF6)3, R = H; 2(PF6)3, R = 4-tBu] contain three {Ru(R2bipy)2}2+ fragments connected to the triangular tris-chelating ligand hexahydroxytriphenylene (H6HHTP). This bridging ligand contains three dioxolene-type binding sites, each of which can reversibly convert between dianionic catecholate (cat), monoanionic semiquinone (sq) or neutral quinone (q) redox states. The bridging ligand as a whole can therefore exist in seven different redox states from fully reduced [cat,cat,cat]6- through to fully oxidised, neutral [q,q,q]. Cyclic voltammetry of 1(PF6)3 in MeCN reveals six redox processes of which the three at more positive potentials (the sq/q couples) are reversible but the three at more negative potentials (the sq/cat couples) are irreversible with distorted wave shapes due to the insolubility of the reduced forms of the complex. In contrast, the more soluble complex 2(PF6)3 displays six reversible one-electron redox processes making all components of a seven-membered redox chain accessible. UV/Vis/NIR spectro-electrochemical studies reveal rich spectroscopic behaviour, with--in particular--very intense transitions in the near-IR region in many of the oxidation states associated with Ru(II)-->(dioxolene) MLCT and bridging ligand centred pi-pi* transitions. TDDFT calculations were used to analyse the electronic spectra in all seven oxidation states; the calculated spectra generally show very good agreement with experiment, which has allowed a fairly complete assignment of the low-energy transitions. The strong electrochromism of the complexes in the near-IR region has formed the basis of an optical window in which a thin film of 1(PF6)3 or 2(PF6)3 on a conductive glass surface can be reversibly and rapidly switched between redox states that alternate between strongly absorbing or near-transparent at 1100 nm, with--for 2(PF6)3--the switching being stable and reversible in water over thousands of cycles.

  8. Comprehensive evaluation of fracture critical bridges.

    Science.gov (United States)

    2014-02-01

    Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In a fracture critical bridge a failure of a tension member leads to collapse of the bridge. However, ...

  9. Myocardial Bridge

    Science.gov (United States)

    ... Center > Myocardial Bridge Menu Topics Topics FAQs Myocardial Bridge En español Your heart is made of muscle, ... surface of the heart. What is a myocardial bridge? A myocardial bridge is a band of heart ...

  10. Timber in Bridge Structures

    OpenAIRE

    Detkin, Viktoria

    2016-01-01

    The purpose of this final year project was to study the properties of timber as a structural material and the suitability of wood in load bearing members for bridge structures. For a case study, an existing timber bridge was selected. Due to its condition the bridge should be replaced. The design of a new bridge with steel beams holding a glulam deck was made. During the case study the replacement of steel beams by glulam timber ones was discussed. Some calculations were made in order to ...

  11. Railroad Bridges

    Data.gov (United States)

    Department of Homeland Security — Bridges-Rail in the United States According to The National Bridge Inspection Standards published in the Code of Federal Regulations (23 CFR 650.3), a bridge isA...

  12. Bridging Anticoagulation

    Science.gov (United States)

    ... clinical centers in the United States, Canada, and Brazil. A more detailed description of the study is ... Your Personal Message Send Message Share on Social Media Bridging Anticoagulation The BRIDGE Study Investigators Circulation. 2012; ...

  13. The future of rapid bridge deck replacement.

    Science.gov (United States)

    2015-06-01

    Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose : inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction : techniques often use precast member...

  14. Nondestructive testing for bridge diagnosis

    International Nuclear Information System (INIS)

    Oshima, Toshiyuki; Mikami, Shuichi; Yamazaki, Tomoyuki

    1997-01-01

    There are many motivations for bridge diagnosis using Nondestructive testing (NDT) to monitor its integrity. The measured frequency and damping on real bridge are compared in one figure as a function of span length and general aspects are explained. These date were measured in every construction of bridges and applied to design new bridges. Ultrasonic testing is also well used for concrete and steel members mainly to detect internal damages or delaminations. Detail analysis on reflected waves gives us more accurate information about the defect. Experimental results are shown as examples in this paper.

  15. Myocardial Bridging

    Directory of Open Access Journals (Sweden)

    Shi-Min Yuan

    2016-02-01

    Full Text Available Abstract Myocardial bridging is rare. Myocardial bridges are most commonly localized in the middle segment of the left anterior descending coronary artery. The anatomic features of the bridges vary significantly. Alterations of the endothelial morphology and the vasoactive agents impact on the progression of atherosclerosis of myocardial bridging. Patients may present with chest pain, myocardial infarction, arrhythmia and even sudden death. Patients who respond poorly to the medical treatment with β-blockers warrant a surgical intervention. Myotomy is a preferred surgical procedure for the symptomatic patients. Coronary stent deployment has been in limited use due to the unsatisfactory long-term results.

  16. Guide for In-Place Treatment of Covered and Timber Bridges

    Science.gov (United States)

    Stan Lebow; Grant Kirker; Robert White; Terry Amburgey; H. Michael Barnes; Michael Sanders; Jeff Morrell

    2012-01-01

    Historic covered bridges and current timber bridges can be vulnerable to damage from biodeterioration or fire. This guide describes procedures for selecting and applying in-place treatments to prevent or arrest these forms of degradation. Vulnerable areas for biodeterioration in covered bridges include members contacting abutments, members near the ends of bridges...

  17. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  18. National Bridge Inventory (NBI) Bridges

    Data.gov (United States)

    Department of Homeland Security — The NBI is a collection of information (database) describing the more than 600,000 of the Nation's bridges located on public roads, including Interstate Highways,...

  19. History of cable-stayed bridges

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1999-01-01

    The principle of supporting a bridge deck by inclined tension members leading to towers on either side of the span has been known for centuries. However, the real development of cable-stayed bridges did not begin before the 1950s. Since then the free span has been increased from 183 m in the Strö...

  20. Project LOCAL - Bridging The Gap

    Science.gov (United States)

    Haven, Robert N.

    1975-01-01

    Project LOCAL, a not-for-profit regional consortium, offers a broad spectrum of in-service training courses tailored to meet the needs of educators in various disciplines and levels of experience. The purpose of these offerings is to bridge the communication gap between innovative centers in computer-oriented education and staff members in Boston…

  1. Bridged graphite oxide materials

    Science.gov (United States)

    Herrera-Alonso, Margarita (Inventor); McAllister, Michael J. (Inventor); Aksay, Ilhan A. (Inventor); Prud'homme, Robert K. (Inventor)

    2010-01-01

    Bridged graphite oxide material comprising graphite sheets bridged by at least one diamine bridging group. The bridged graphite oxide material may be incorporated in polymer composites or used in adsorption media.

  2. Building Bridges

    DEFF Research Database (Denmark)

    The report Building Bridges adresses the questions why, how and for whom academic audience research has public value, from the different points of view of the four working groups in the COST Action IS0906 Transforming Audiences, Transforming Societies – “New Media Genres, Media Literacy and Trust...... in the Media”, “Audience Interactivity and Participation”, “The Role of Media and ICT Use for Evolving Social Relationships” and “Audience Transformations and Social Integration”. Building Bridges is the result of an ongoing dialogue between the Action and non-academic stakeholders in the field of audience......, Brian O’Neill, Andra Siibak, Sascha Trültzsch-Wijnen, Nicoletta Vittadini, Igor Vobič and Frauke Zeller. Stakeholder feedback from: Michelle Arlotta (DeAgostini), Andreea M. Costache (Association of Consumers of Audiovisual Media in Catalonia/TAC), Francesco Diasio (AMARC Europe), Marius Dragomir (Open...

  3. Mathematical bridges

    CERN Document Server

    Andreescu, Titu; Tetiva, Marian

    2017-01-01

    Building bridges between classical results and contemporary nonstandard problems, Mathematical Bridges embraces important topics in analysis and algebra from a problem-solving perspective. Blending old and new techniques, tactics and strategies used in solving challenging mathematical problems, readers will discover numerous genuine mathematical gems throughout that will heighten their appreciation of the inherent beauty of mathematics. Most of the problems are original to the authors and are intertwined in a well-motivated exposition driven by representative examples. The book is structured to assist the reader in formulating and proving conjectures, as well as devising solutions to important mathematical problems by making connections between various concepts and ideas from different areas of mathematics. Instructors and educators teaching problem-solving courses or organizing mathematics clubs, as well as motivated mathematics students from high school juniors to college seniors, will find Mathematical Bri...

  4. Salt bridges: geometrically specific, designable interactions.

    Science.gov (United States)

    Donald, Jason E; Kulp, Daniel W; DeGrado, William F

    2011-03-01

    Salt bridges occur frequently in proteins, providing conformational specificity and contributing to molecular recognition and catalysis. We present a comprehensive analysis of these interactions in protein structures by surveying a large database of protein structures. Salt bridges between Asp or Glu and His, Arg, or Lys display extremely well-defined geometric preferences. Several previously observed preferences are confirmed, and others that were previously unrecognized are discovered. Salt bridges are explored for their preferences for different separations in sequence and in space, geometric preferences within proteins and at protein-protein interfaces, co-operativity in networked salt bridges, inclusion within metal-binding sites, preference for acidic electrons, apparent conformational side chain entropy reduction on formation, and degree of burial. Salt bridges occur far more frequently between residues at close than distant sequence separations, but, at close distances, there remain strong preferences for salt bridges at specific separations. Specific types of complex salt bridges, involving three or more members, are also discovered. As we observe a strong relationship between the propensity to form a salt bridge and the placement of salt-bridging residues in protein sequences, we discuss the role that salt bridges might play in kinetically influencing protein folding and thermodynamically stabilizing the native conformation. We also develop a quantitative method to select appropriate crystal structure resolution and B-factor cutoffs. Detailed knowledge of these geometric and sequence dependences should aid de novo design and prediction algorithms. Copyright © 2010 Wiley-Liss, Inc.

  5. Bridge resource program.

    Science.gov (United States)

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...

  6. Bridge management systems: An asset management tool for road structures

    CSIR Research Space (South Africa)

    Nordengen, Paul A

    2012-10-01

    Full Text Available Culverts Ret Walls Buildings Traffic Storm water Etc ? Combined Priorities and Budget Optimised Programme Bridge Project Funding ? Road projects and bridge projects compete for the same ?pot? of funds ? Road failures are more common and more... & retaining walls 18. Longitudinal members 8. Surfacing/ballast (decks & arches) 9. Deck drainage 19. Transverse members 10. Kerbs/sidewalks 20. Deck slabs & arches 11. Parapets & handrails 21. Miscellaneous Condition Survey ? Survey is required...

  7. Bridge element deterioration rates.

    Science.gov (United States)

    2008-10-01

    This report describes the development of bridge element deterioration rates using the NYSDOT : bridge inspection database using Markov chains and Weibull-based approaches. It is observed : that Weibull-based approach is more reliable for developing b...

  8. Bridge vehicle impact assessment.

    Science.gov (United States)

    2011-12-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  9. Bridge Scour Technology Transfer

    Science.gov (United States)

    2018-01-24

    Scour and flooding are the leading causes of bridge failures in the United States and therefore should be monitored. New applications of tools and technologies are being developed, tested, and implemented to reduce bridge scour risk. The National Coo...

  10. LTBP bridge performance primer.

    Science.gov (United States)

    2013-12-01

    "The performance of bridges is critical to the overall performance of the highway transportation system in the United States. However, many critical aspects of bridge performance are not well understood. The reasons for this include the extreme diver...

  11. Design of Usui bridge (PC cable stayed bridge). Usuihashi (PC shachokyo) no sekkei ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Kido, M.; Iizuka, Y. (Japan Highway Public Corp., Tokyo (Japan)); Tanaka, S.; Otsuka, K. (P.S. Concrete Co. Ltd. Kajima Corp. Joint Venture, Tokyo (Japan)); Kitakuni, S. (Kajima Corp., Tokyo (Japan))

    1991-11-30

    Structure and design of single suspension PC cable bridge, which is first kind of high way bridge in Japan and aiming to start for general use by March, 1993, are reported. As a construction outline, main construction quantity and general layout of the whole bridge together with the selective detail and characteristics of the diagonal member, tower, main girder and tower support member, are cited. Design conditions( load, materials, allowable stress and others ), basic plan of the design, and structure analysis( surface stress framed structure analysis, stereoscopic framework analysis and FEM analysis of local stress ) are explained. Design of structure member like main girder is based on diagonal member tension, wave shearing force, level of diagonal strain stress, bending stress when diagonal member anchors the deformed main tower caused by living load during earth quake, principal stress of main tower junction and local stress etc. Main tower support member design is based on the results of corbel shearing force at varied cross section and main stress, and diagonal member design is decided by allowable stress. Diagonal member anchorage traverse beam design depends on bending moment of traverse beam and shearing force. 3 refs., 15 figs., 1 tab.

  12. Cable Supported Bridges

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    Cable supported bridges in the form of suspension bridges and cable-stayed bridges are distinguished by their ability to overcome large spans.The book concentrates on the synthesis of cable supported bridges, covering both design and construction aspects. The analytical part covers simple methods...... to quantify the different structural configurations and allows a preliminary optimization of the main structure.Included are the most recent advances in structural design, corrosion protection of cables, aerodynamic safety, and erection procedures....

  13. Development of flexural vibration inspection techniques to rapidly assess the structural health of rural bridge systems

    Science.gov (United States)

    Brian K. Brashaw; Robert Vatalaro; Xiping Wang; Kevin Sarvela; James P. Wacker

    2008-01-01

    Approximately 4,000 vehicle bridges in the State of Minnesota contain structural timber members. Recent research at the University of Minnesota Duluth Natural Resources Research Institute (UMD NRRI) has been conducted on vibration testing of timber bridges as a means of developing rapid in-place testing techniques for assessing the structural health of bridges. The...

  14. Principles of Bridge Reliability

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Nowak, Andrzej S.

    The paper gives a brief introduction to the basic principles of structural reliability theory and its application to bridge engineering. Fundamental concepts like failure probability and reliability index are introduced. Ultimate as well as serviceability limit states for bridges are formulated......, and as an example the reliability profile and a sensitivity analyses for a corroded reinforced concrete bridge is shown....

  15. Automatic Bridge Control System

    OpenAIRE

    M. Niraimathi; S.Sivakumar; R.Vigneshwaran; R.Vinothkumar; P.Babu

    2012-01-01

    Bridge vibration control is an important issue whose purpose is to extend the structural service life of bridges. Normally, the bridge is modeled as an elastic beam or plate subject to a moving vehicle. However, the moving truck on a bridge is a complicated problem that must still be researched. In this paper, wepropose a new method, to overcome the huge load in the bridge a load cell is used at the entry which will monitor the load continuously at both ends. To escape from the heavy water fl...

  16. Monitoring system of arch bridge for safety network management

    Science.gov (United States)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  17. Drill pipe bridge plug

    International Nuclear Information System (INIS)

    Winslow, D.W.; Brisco, D.P.

    1991-01-01

    This patent describes a method of stopping flow of fluid up through a pipe bore of a pipe string in a well. It comprises: lowering a bridge plug apparatus on a work string into the pipe string to a position where the pipe bore is to be closed; communicating the pipe bore below a packer of the bridge plug apparatus through the bridge plug apparatus with a low pressure zone above the packer to permit the fluid to flow up through the bridge plug apparatus; engaging the bridge plug apparatus with an internal upset of the pipe string; while the fluid is flowing up through the bridge plug apparatus, pulling upward on the work string and the bridge plug apparatus and thereby sealing the packer against the pipe bore; isolating the pipe bore below the packer from the low pressure zone above the packer and thereby stopping flow of the fluid up through the pipe bore; disconnecting the work string from the bridge plug apparatus; and maintaining the bridge plug apparatus in engagement with the internal upset and sealed against the pipe bore due to an upward pressure differential applied to the bridge plug apparatus by the fluid contained therebelow

  18. Bridge over troubled water?

    DEFF Research Database (Denmark)

    Svendsen, Gunnar Lind Haase; Nannestad, Peter; Svendsen, Gert Tinggaard

    2008-01-01

    The problem of integrating non-Western immigrants into Western welfare states is the focus of this paper. To address this issue, we suggest a social capital approach in which we apply the conceptual pair of bridging social capital (BR), which connects an individual to the broader social structure...... relationship between the levels of bridging and bonding capital, suggesting that bonding social capital in the immigrant group does not seem to impede the establishment of the bridging social capital needed for integration....

  19. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  20. The hepatic bridge.

    Science.gov (United States)

    Sugarbaker, Paul H

    2018-07-01

    The hepatic bridge forms a tunnel of liver parenchyma that may obscure peritoneal metastases associated with the round ligament. Visualization and then resection of nodules associated with this structure is necessary. The incidence of a hepatic bridge and the extent that it covered the round ligament was determined in consecutive patients. Extent of coverage of the round ligament by the hepatic bridge was determined: Class 1 indicates up to one-third of the round ligament obscured, Class 2 up to two-thirds and Class 3 more than two-thirds. In 102 patients in whom the round ligament of the liver could be completely visualized, 50 had a hepatic bridge. Class 1 was 22 (44%) of the bridges, Class 2 was 16 (32%) and Class 3 was 12 (24%). A hepatic bridge was more frequently present in 28 of 45 male patients (62%) vs. 22 of 57 female patients (38%). Approximately one-half of our patients having cytoreductive surgery for peritoneal metastases were observed to have a hepatic bridge. Up to 56% of these patients have Class 2 or 3 hepatic bridge and may require division of the hepatic bridge to completely visualize the contents of the tunnel created by this structure. Copyright © 2018 Elsevier Ltd, BASO ~ The Association for Cancer Surgery, and the European Society of Surgical Oncology. All rights reserved.

  1. Bridging the Gap

    DEFF Research Database (Denmark)

    Kramer Overgaard, Majken; Broeng, Jes; Jensen, Monika Luniewska

    Bridging the Gap (BtG) is a 2-year project funded by The Danish Industry Foundation. The goal of Bridging the Gap has been to create a new innovation model which will increase the rate at which Danish universities can spinout new technology ventures.......Bridging the Gap (BtG) is a 2-year project funded by The Danish Industry Foundation. The goal of Bridging the Gap has been to create a new innovation model which will increase the rate at which Danish universities can spinout new technology ventures....

  2. Bridge health monitoring metrics : updating the bridge deficiency algorithm.

    Science.gov (United States)

    2009-10-01

    As part of its bridge management system, the Alabama Department of Transportation (ALDOT) must decide how best to spend its bridge replacement funds. In making these decisions, ALDOT managers currently use a deficiency algorithm to rank bridges that ...

  3. Long-term bridge performance high priority bridge performance issues.

    Science.gov (United States)

    2014-10-01

    Bridge performance is a multifaceted issue involving performance of materials and protective systems, : performance of individual components of the bridge, and performance of the structural system as a whole. The : Long-Term Bridge Performance (LTBP)...

  4. Members of the Agency

    International Nuclear Information System (INIS)

    2007-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.63) is Palau which deposited its Instrument of Acceptance of the Statute on 2 March 2007. The Attachment hereto shows the dates on which the present 144 Member States became Members [fr

  5. Members of the Agency

    International Nuclear Information System (INIS)

    2007-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.63) is Palau which deposited its Instrument of Acceptance of the Statute on 2 March 2007. The Attachment hereto shows the dates on which the present 144 Member States became Members [es

  6. National Bridge Inventory System (NBI)

    Data.gov (United States)

    Department of Transportation — The NBI System is the collection of bridge inspection information and costs associated with bridge replacements of structurally deficient bridges on and off the NHS....

  7. Virtual Bridge Design Challenge

    Science.gov (United States)

    Mitts, Charles R.

    2013-01-01

    This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…

  8. Bridge the Gap

    DEFF Research Database (Denmark)

    Marselis, Randi

    2017-01-01

    This article focuses on photo projects organised for teenage refugees by the Society for Humanistic Photography (Berlin, Germany). These projects, named Bridge the Gap I (2015), and Bridge the Gap II (2016), were carried out in Berlin and brought together teenagers with refugee and German...

  9. Covered Bridge Security Manual

    Science.gov (United States)

    Brett Phares; Terry Wipf; Ryan Sievers; Travis Hosteng

    2013-01-01

    The design, construction, and use of covered timber bridges is all but a lost art in these days of pre-stressed concrete, high-performance steel, and the significant growth both in the volume and size of vehicles. Furthermore, many of the existing covered timber bridges are preserved only because of their status on the National Registry of Historic Places or the...

  10. The floating water bridge

    International Nuclear Information System (INIS)

    Fuchs, Elmar C; Woisetschlaeger, Jakob; Gatterer, Karl; Maier, Eugen; Pecnik, Rene; Holler, Gert; Eisenkoelbl, Helmut

    2007-01-01

    When high voltage is applied to distilled water filled in two glass beakers which are in contact, a stable water connection forms spontaneously, giving the impression of a floating water bridge. A detailed experimental analysis reveals static and dynamic structures as well as heat and mass transfer through this bridge

  11. Students design composite bridges

    NARCIS (Netherlands)

    Stark, J.W.B.; Galjaard, J.C.; Brekelmans, J.W.P.M.

    1999-01-01

    The paper gives an overview of recent research on steel-concrete composite bridge design by students of Delft University of Technology doing their master's thesis. Primary objective of this research was to find possibilities for application of steel-concrete composite bridges in the Netherlands,

  12. Learning bridge tool to improve student learning, preceptor training, and faculty teamwork.

    Science.gov (United States)

    Karimi, Reza; Cawley, Pauline; Arendt, Cassandra S

    2011-04-11

    To implement a Learning Bridge tool to improve educational outcomes for pharmacy students as well as for preceptors and faculty members. Pharmacy faculty members collaborated to write 9 case-based assignments that first-year pharmacy (P1) students worked with preceptors to complete while at experiential sites. Students, faculty members, and preceptors were surveyed about their perceptions of the Learning Bridge process. As in our pilot study,(1) the Learning Bridge process promoted student learning. Additionally, the Learning Bridge assignments familiarized preceptors with the school's P1 curriculum and its content. Faculty teamwork also was increased through collaborating on the assignments. The Learning Bridge assignments provided a compelling learning environment and benefited students, preceptors, and faculty members.

  13. Fatigue-Prone Details in Steel Bridges

    Directory of Open Access Journals (Sweden)

    Mohsen Heshmati

    2012-11-01

    Full Text Available This paper reviews the results of a comprehensive investigation including more than 100 fatigue damage cases, reported for steel and composite bridges. The damage cases are categorized according to types of detail. The mechanisms behind fatigue damage in each category are identified and studied. It was found that more than 90% of all reported damage cases are of deformation-induced type and generated by some kind of unintentional or otherwise overlooked interaction between different load-carrying members or systems in the bridge. Poor detailing, with unstiffened gaps and abrupt changes in stiffness at the connections between different members were also found to contribute to fatigue cracking in many details.

  14. An effective Handling of Thermal Bridges in the EPBD Context

    DEFF Research Database (Denmark)

    Erhorn, Hans; Erhorn-Kluttig, Heike; Thomsen, Kirsten Engelund

    The ASIEPI project has collected and analysed international and national information from up to 17 EU Member States plus Norway on the topic of thermal bridges in buildings. Seven different aspects have been addressed, ranging from EU Member States’ approaches in regulations to quantification...... of thermal bridge effects to the energy balance, used software tools and thermal bridge atlases, available good practice guidance and promotion of good building practice to the execution quality and advanced thermal bridge driven technical developments. This report presents the gathered knowledge, draws...... conclusions, shows good country examples and gives recommendations to specific groups of audience such as policy makers and standardisation bodies but also to educational institutions, building professionals, building owners and the building industry on how to improve the quality of building component...

  15. IceBridge: Bringing a Field Campaign Home

    Science.gov (United States)

    Woods, J.; Beck, J.; Bartholow, S.

    2015-12-01

    IceBridge, a six-year NASA mission, is the largest airborne survey of Earth's polar ice ever flown. It will yield an unprecedented three-dimensional view of Arctic and Antarctic ice sheets, ice shelves and sea ice. These flights will provide a yearly, multi-instrument look at the behavior of the rapidly changing features of the Greenland and Antarctic ice. Data collected during IceBridge will help scientists bridge the gap in polar observations between NASA's Ice, Cloud and Land Elevation Satellite (ICESat) -- in orbit since 2003 -- and ICESat-2, planned for 2017. ICESat stopped collecting science data in 2009, making IceBridge critical for ensuring a continuous series of observations. IceBridge will use airborne instruments to map Arctic and Antarctic areas once a year at a minimum, with new campaigns being developed during the Arctic melt season. IceBridge flights are conducted in the spring and summer for the Arctic and in the fall over Antarctica. Other smaller airborne surveys around the world are also part of the IceBridge campaign. IceBridge actively engages the public and educators through a variety of outlets ranging from communications strategies through social media outlets, to larger organized efforts such as PolarTREC. In field activities include blog posts, photo updates, in flight chat sessions, and more intensive live events to include google hangouts, where field team members can interact with the public during a scheduled broadcast. The IceBridge team provides scientists and other team members with the training and support to become communicators in their own right. There is an exciting new initiative where IceBridge will be collaborating with Undergraduate and Graduate students to integrate the next generation of scientists and communicators into the Science Teams. This will be explored through partnerships with institutions that are interested in mentoring through project based initiatives.

  16. Bridge technology report

    CERN Document Server

    2013-01-01

    Please note this is a Short Discount publication. As LANs have proliferated, new technologies and system concepts have come to the fore. One of the key issues is how to interconnect networks. One means of interconnection is to use a 'bridge'. Other competing technologies are repeaters, routers, and gateways. Bridges permit traffic isolation, connect network segments together and operate at the MAC layer. Further, because they operate at the MAC layer, they can handle a variety of protocols such as TCP/IP, SNA, and X.25. This report focuses on the specific technology of bridging two netw

  17. Construction of the Chamagawa bridge; Chamagawabashi no seko

    Energy Technology Data Exchange (ETDEWEB)

    Kawado, A.; Okawa, M. [Honshu-Shikoku Bridge Authority, Tokyo (Japan); Yoshii, M.; Oda, I.

    1997-09-30

    The Chamagawa Bridge is a reinforced concrete fixed-arch bridge which is located at the northern end of Awaji Island, 1.5 km away from the Honshu-Shikoku linking large-scale Akashi Strait Bridge. This paper describes the design and construction of the bridge. Overhang construction method using cable stayed members was adopted. Against the tensile stress generated in the arch-ring under construction, reaction force was burdened with cable stayed columns, anchor blocks and ground anchors by regulating stress using cable stayed members and by resisting using PC steel rods arranging in the arch-ring. For the construction of arch-ring, a space was made for fabricating a specific large-scale movable working vehicle by the grounding support. Then, overhang construction was started. For the construction of overhang, construction of cable stayed members, regulation of stress, and tension of ground anchors were conducted with the construction of each block. The construction of linking block in the center was conducted by hanging support method after the specific large-scale movable working vehicle was taken to pieces. After the connection of arch-ring, tensile forces of cable stayed members and ground anchors were released. The bridge was completed in the down road in 1997. 1 ref., 21 figs., 6 tabs.

  18. Bridge removal plan requirements.

    Science.gov (United States)

    2011-04-15

    This report provides resources that detail specifications and guidelines related to bridge removal plans across the : United States. We have organized the information into three sections: : ! National Guidance : Includes language from AASHTO specific...

  19. Bridged Race Population Estimates

    Data.gov (United States)

    U.S. Department of Health & Human Services — Population estimates from "bridging" the 31 race categories used in Census 2000, as specified in the 1997 Office of Management and Budget (OMB) race and ethnicity...

  20. Bridging Humanism and Behaviorism.

    Science.gov (United States)

    Chu, Lily

    1980-01-01

    Humanistic behaviorism may provide the necessary bridge between behaviorism and humanism. Perhaps the most humanistic approach to teaching is to learn how certain changes will help students and how these changes can be accomplished. (Author/MLF)

  1. Cooperativity of complex salt bridges

    OpenAIRE

    Gvritishvili, Anzor G.; Gribenko, Alexey V.; Makhatadze, George I.

    2008-01-01

    The energetic contribution of complex salt bridges, in which one charged residue (anchor residue) forms salt bridges with two or more residues simultaneously, has been suggested to have importance for protein stability. Detailed analysis of the net energetics of complex salt bridge formation using double- and triple-mutant cycle analysis revealed conflicting results. In two cases, it was shown that complex salt bridge formation is cooperative, i.e., the net strength of the complex salt bridge...

  2. Long Span Bridges in Scandinavia

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1998-01-01

    The first Scandinavian bridge with a span of more than 500 m was the Lillebælt Suspension Bridge opened to traffic in 1970.Art the end of the 20th century the longest span of any European bridge is found in the Storebælt East Bridge with a main span of 1624 m. Also the third longest span in Europe...... is found in Scandinavia - the 1210 m span of the Höga Kusten Bridge in Sweden.The Kvarnsund Bridge in Norway was at the completion in 1991 the longest cable-stayed bridge in the world, and the span of 530 m is still thge longest for cable-stayed bridges in concrete. The Øresund Bridge with its sapn of 490...

  3. Nonlinearity in oscillating bridges

    Directory of Open Access Journals (Sweden)

    Filippo Gazzola

    2013-09-01

    Full Text Available We first recall several historical oscillating bridges that, in some cases, led to collapses. Some of them are quite recent and show that, nowadays, oscillations in suspension bridges are not yet well understood. Next, we survey some attempts to model bridges with differential equations. Although these equations arise from quite different scientific communities, they display some common features. One of them, which we believe to be incorrect, is the acceptance of the linear Hooke law in elasticity. This law should be used only in presence of small deviations from equilibrium, a situation which does not occur in widely oscillating bridges. Then we discuss a couple of recent models whose solutions exhibit self-excited oscillations, the phenomenon visible in real bridges. This suggests a different point of view in modeling equations and gives a strong hint how to modify the existing models in order to obtain a reliable theory. The purpose of this paper is precisely to highlight the necessity of revisiting the classical models, to introduce reliable models, and to indicate the steps we believe necessary to reach this target.

  4. Condition assessment of timber bridges. 2, Evaluation of several stress-wave tools

    Science.gov (United States)

    Brian K. Brashaw; Robert J. Vatalaro; James P. Wacker; Robert J. Ross

    2005-01-01

    This study was conducted to evaluate the accuracy and reliability of several stress-wave devices widely used for locating deteriorated areas in timber bridge members. Bridge components containing different levels of natural decay were tested using various devices. The specimens were then sawn (along their length) into slabs to expose their interior condition. The...

  5. Active Control of Suspension Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper some recent research on active control of very long suspension bridges, is presented. The presentation is based on research work at Aalborg University, Denmark. The active control system is based on movable flaps attached to the bridge girder. Wind load on bridges with or without...... flaps attached to the girder is briefly presented. A simple active control system is discussed. Results from wind tunnel experiments with a bridge section show that flaps can be used effectively to control bridge girder vibrations. Flutter conditions for suspension bridges with and without flaps...

  6. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  7. Health monitoring of precast bridge deck panels reinforced with glass fiber reinforced polymer (GFRP) bars.

    Science.gov (United States)

    2012-03-01

    The present research project investigates monitoring concrete precast panels for bridge decks that are reinforced with Glass Fiber Reinforced Polymer (GFRP) bars. Due to the lack of long term research on concrete members reinforced with GFRP bars, lo...

  8. Istanbul Bridge Conference 2014

    CERN Document Server

    Gülkan, Polat; Mahmoud, Khaled

    2016-01-01

      The book includes peer-reviewed contributions selected from presentations given at the Istanbul Bridge Conference 2014, held from August 11 – 13 in Istanbul, Turkey. It reports on the current challenges in bridge engineering faced by professionals around the globe, giving a special emphasis to recently developed techniques, innovations and opportunities. The book covers key topics in the field, including modeling and analysis methods; construction and erection techniques; design for extreme events and condition assessment and structural health monitoring. There is a balanced presentation of theory, research and practice. This book, which provides the readers with a comprehensive and timely reference guide on current practices in bridge engineering, is intended for professionals, academic researchers and students alike.

  9. Bridge deterioration models to support Indiana's bridge management system.

    Science.gov (United States)

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  10. Development of bridge girder movement criteria for accelerated bridge construction.

    Science.gov (United States)

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  11. Study on the structural characteristics of extradosed concrete bridges; Ekusutoradozudo kyo no kozo tokusei ni kansuru ichikosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Y. [Japan Highway Public Corp., Tokyo (Japan); Kasuga, A. [Sumitomo Construction Co. Ltd., Tokyo (Japan); Yamazaki, J. [Nihon Univ., Tokyo (Japan). Coll. of Science and Engineering

    1997-03-31

    Parameters are analyzed to provide data for deciding, in the planning and designing stages, whether a cable stayed bridge or an extradosed bridge should be adopted. Comparative investigation of the vibration properties of both types of bridges is also referred to. The result of the study on the structural properties of the cable stayed road bridge and the extradosed road bridge is introduced. Based on the concept of the extradosed bridge, designers are now able to select without restraint the after load sharing rate of the diagonal members. Parameter analysis of a diagonal member reinforced 3-span continuous beam is performed. By introducing indices showing the load sharing rate of the diagonal member, the cable stayed bridge can be distinguished logically from the extradosed bridge in designing. It is found important that the height of the main tower is set to approximately 10% the length of the center span for the construction of the extradosed bridge. The vibration properties of the cable stayed bridge and the extradosed bridge of the same scale are compared. 7 refs., 18 figs., 6 tabs.

  12. BUILDING "BRIDGES" WITH QUALITY ASSURANCE

    Science.gov (United States)

    The papr describes how, rather than building "bridges" across centuries, quality assurance (QA) personnel have the opportunity to build bridges across technical disciplines, between public and private organizations, and between different QA groups. As reviewers and auditors of a...

  13. Bridge-Vehicle Impact Assessment

    Science.gov (United States)

    2011-08-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  14. Virginia Bridge Information Systems Laboratory.

    Science.gov (United States)

    2014-06-01

    This report presents the results of applied data mining of legacy bridge databases, focusing on the Pontis and : National Bridge Inventory databases maintained by the Virginia Department of Transportation (VDOT). Data : analysis was performed using a...

  15. Public response to bridge colors.

    Science.gov (United States)

    1973-01-01

    To determine people's reactions to bridges painted in colors as white, yellow, green, blue, red, brown, black, and aluminum, two test bridges were selected in Charlottesville, Virginia. One was painted a different color each month and the other was k...

  16. Existing Steel Railway Bridges Evaluation

    Science.gov (United States)

    Vičan, Josef; Gocál, Jozef; Odrobiňák, Jaroslav; Koteš, Peter

    2016-12-01

    The article describes general principles and basis of evaluation of existing railway bridges based on the concept of load-carrying capacity determination. Compared to the design of a new bridge, the modified reliability level for existing bridges evaluation should be considered due to implementation of the additional data related to bridge condition and behaviour obtained from regular inspections. Based on those data respecting the bridge remaining lifetime, a modification of partial safety factors for actions and materials could be respected in the bridge evaluation process. A great attention is also paid to the specific problems of determination of load-caring capacity of steel railway bridges in service. Recommendation for global analysis and methodology for existing steel bridge superstructure load-carrying capacity determination are described too.

  17. Existing Steel Railway Bridges Evaluation

    Directory of Open Access Journals (Sweden)

    Vičan Josef

    2016-12-01

    Full Text Available The article describes general principles and basis of evaluation of existing railway bridges based on the concept of load-carrying capacity determination. Compared to the design of a new bridge, the modified reliability level for existing bridges evaluation should be considered due to implementation of the additional data related to bridge condition and behaviour obtained from regular inspections. Based on those data respecting the bridge remaining lifetime, a modification of partial safety factors for actions and materials could be respected in the bridge evaluation process. A great attention is also paid to the specific problems of determination of load-caring capacity of steel railway bridges in service. Recommendation for global analysis and methodology for existing steel bridge superstructure load-carrying capacity determination are described too.

  18. Looking Beyond the Bridge

    DEFF Research Database (Denmark)

    Jahn, Elke; Rosholm, Michael

    We perform a comprehensive analysis of the stepping-stone effect of temporary agency employment on unemployed workers. Using the timing-of-events approach, we not only investigate whether agency employment is a bridge into regular employment but also analyze its effect on post-unemployment wages...

  19. Bridging a Cultural Gap

    Science.gov (United States)

    Leviatan, Talma

    2008-01-01

    There has been a broad wave of change in tertiary calculus courses in the past decade. However, the much-needed change in tertiary pre-calculus programmes--aimed at bridging the gap between high-school mathematics and tertiary mathematics--is happening at a far slower pace. Following a discussion on the nature of the gap and the objectives of a…

  20. Building a Straw Bridge

    Science.gov (United States)

    Teaching Science, 2015

    2015-01-01

    This project is for a team of students (groups of two or three are ideal) to design and construct a model of a single-span bridge, using plastic drinking straws as the building material. All steps of the design, construction, testing and critiquing stages should be recorded by students in a journal. Students may like to include labelled diagrams,…

  1. Bridging the Gap?

    Science.gov (United States)

    Salter, Colin

    2009-01-01

    The political context of the conversion of the Historic Tramway Bridge, adjacent to Sandon Point in Bulli (NSW, Australia), and how this was exploited to serve predetermined ends, illustrates that technologies can be designed to have particular social (and political) effects. Through reflection on this relatively small engineering project, this…

  2. Quantum Bidding in Bridge

    Science.gov (United States)

    Muhammad, Sadiq; Tavakoli, Armin; Kurant, Maciej; Pawłowski, Marcin; Żukowski, Marek; Bourennane, Mohamed

    2014-04-01

    Quantum methods allow us to reduce communication complexity of some computational tasks, with several separated partners, beyond classical constraints. Nevertheless, experimental demonstrations of this have thus far been limited to some abstract problems, far away from real-life tasks. We show here, and demonstrate experimentally, that the power of reduction of communication complexity can be harnessed to gain an advantage in a famous, immensely popular, card game—bridge. The essence of a winning strategy in bridge is efficient communication between the partners. The rules of the game allow only a specific form of communication, of very low complexity (effectively, one has strong limitations on the number of exchanged bits). Surprisingly, our quantum technique does not violate the existing rules of the game (as there is no increase in information flow). We show that our quantum bridge auction corresponds to a biased nonlocal Clauser-Horne-Shimony-Holt game, which is equivalent to a 2→1 quantum random access code. Thus, our experiment is also a realization of such protocols. However, this correspondence is not complete, which enables the bridge players to have efficient strategies regardless of the quality of their detectors.

  3. Bridging the Transition Gap

    Science.gov (United States)

    2013-05-23

    period and provide recommendations to guide future research and policy development. 4 DEFINING THE TRANSITIONAL SECURITY GAP There have been...BRIDGING THE TRANSITION GAP A Monograph by MAJ J.D. Hansen United States Army School of Advanced Military Studies United States Army...suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704

  4. Bridging the Gaps.

    Science.gov (United States)

    Netzer, Greg

    1995-01-01

    Discusses a model water quality monitoring project, Project Bridge, established to train minority girls about to enter eighth grade in scientific procedures followed by hands-on experimentation. Students spent a week monitoring water in an urban stream and analyzing results. (LZ)

  5. Bridging the Gap

    DEFF Research Database (Denmark)

    Dahlberg, Rasmus

    2016-01-01

    The fixed link between Denmark and Sweden connects two busy cities and a large international airport with many of its travelers and employees. 18,000 vehicles and 160 passenger trains transport each day more than 70,000 people across the combined road and rail Øresund Bridge and through the Øresu...... in its final report to the Danish and Swedish transport authorities while drawing upon experiences from two recent comparable cases of infrastructure disruptions: The Champlain Bridge (2009) and the Forth Road Bridge (2015).......The fixed link between Denmark and Sweden connects two busy cities and a large international airport with many of its travelers and employees. 18,000 vehicles and 160 passenger trains transport each day more than 70,000 people across the combined road and rail Øresund Bridge and through the Øresund...... Tunnel, approximately 25,000 of them critical to the regional work market. Even though the risk analysis states that the likelihood of a long-term closure (100C days) is very low Danish and Swedish transport authorities have demanded that the infrastructure operator conducts a survey of the preparedness...

  6. Revised Rules for Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Jensen, F. M.; Middleton, C.

    This paper is based on research performed for the Highway Agency, London, UK under the project DPU/9/44 "Revision of Bridge Assessment Rules Based on Whole Life Performance: Concrete Bridges" It contains details of a methodology which can be used to generate Whole Life (WL) reliability profiles....... These WL reliability profiles may be used to establish revised rules for Concrete Bridges....

  7. Simulation of multivariate diffusion bridges

    DEFF Research Database (Denmark)

    Bladt, Mogens; Finch, Samuel; Sørensen, Michael

    We propose simple methods for multivariate diffusion bridge simulation, which plays a fundamental role in simulation-based likelihood and Bayesian inference for stochastic differential equations. By a novel application of classical coupling methods, the new approach generalizes a previously...... proposed simulation method for one-dimensional bridges to the mulit-variate setting. First a method of simulating approzimate, but often very accurate, diffusion bridges is proposed. These approximate bridges are used as proposal for easily implementable MCMC algorithms that produce exact diffusion bridges...

  8. Recent design methods for prestressed concrete cable stayed bridge; PC shachokyo no sekkei gijutsu no genjo

    Energy Technology Data Exchange (ETDEWEB)

    Otsuka, K. [Kajima Corp., Tokyo (Japan)

    1995-02-01

    The number of constructed prestressed concrete cable stayed bridges reached nearly 100 in Japan, and the technique has greatly developed. In this article, the current status of design techniques for prestressed concrete cable stayed bridges were introduced along with the examples of constructed bridges for the analysis method and the design method for each structure part while introducing the current examples of constructed bridges. Also, this kind of extra-dosed prestressed concrete bridge and prestressed concrete bridge with prestressed concrete stays were reported. Standards have been prepared including a chapter for the prestressed concrete cable stayed bridges in the Road Bridge Guideline document in February 1990. Load to be noticed as the characteristics peculiar to the prestressed concrete cable stayed bridges includes the shock due to live load, temperature change, and execution error of a tower. For example, 1/1000 of the total tower height is generally considered as the execution error of the tower. A diagonal member is manufactured at factories and in fields and has both advantages and disadvantages. The linear analysis of plane framework is general. Damping of and earthquakeproof designs against the wind and earthquake of the diagonal member were also provided. 11 refs., 17 figs., 2 tabs.

  9. Integral Abutment and Jointless Bridges

    Directory of Open Access Journals (Sweden)

    Cristian-Claudiu Comisu

    2005-01-01

    Full Text Available Integral bridges, or integral abutment and jointless bridges, as they are more commonly known in the USA, are constructed without any movement joints between spans or between spans and abutments. Typically these bridges have stub-type abutments supported on piles and continuous bridge deck from one embankment to the other. Foundations are usually designed to be small and flexible to facilitate horizontal movement or rocking of the support. Integrally bridges are simple or multiple span ones that have their superstructure cast integrally with their substructure. The jointless bridges cost less to construct and require less maintenance then equivalent bridges with expansion joints. Integral bridges present a challenge for load distribution calculations because the bridge deck, piers, abutments, embankments and soil must all be considered as single compliant system. This paper presents some of the important features of integral abutment and jointless bridge design and some guidelines to achieve improved design. The goal of this paper is to enhance the awareness among the engineering community to use integral abutment and jointless bridges in Romania.

  10. Construction of Daiichi Tamagawa bridge; Daiichi Tamagawa kyoryo no seko

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, O.; Tsuyoshi, T. [East Japan Railway Company, Tokyo (Japan); Ota, T.; Sato, S. [Tekken Corp., Tokyo (Japan)

    1997-05-30

    This paper describes the construction of Daiichi Tamagawa Bridge for JR Tazawako Line, which was reconstructed with the Akita Shinkansen Project apart from the existing line. This bridge is a three-span continuous PC cable stayed bridge. To avoid operation accidents due to snow and ice, independent two-column type with a height of 11 m without beam was employed for the main tower. For the construction of upper part, overhang election construction method was adopted, which can be applied all the year round. The main girder has a single box cross section, and a width of 5.5 m and a beam height of 2.3 m. This was also constructed by the overhang construction method. To reduce the construction period, the main tower was constructed by the precast block construction method. The whole bridge was divided into six blocks by considering the hoist performance of cranes. Reinforcement against bearing pressure and cleavage due to the cable tensile force was conducted by adopting saddle structure for the main tower. Oblique members were jointed with the main girder using lateral beams projected from lateral side of girder. Totally seven PC cables were used for each oblique member. Measurements and management during the overhang construction were also described. The construction was over without problems in August, 1996. This bridge is under test operation using test run vehicles. 2 refs., 20 figs., 7 tabs.

  11. Cable-stayed PC bridge with inclined main tower. Hachinohe port island bridge; Keisha shuto to yusuru 2 keikan renzoku PC shachokyo. Hachinoheko port island renrakykyo (kasho)

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, A. [Hachinohe Institute of Technology, Aomori (Japan)

    1994-09-15

    The design and construction of the inclined main bridge, which is being constructed at the mouth of the Hachinohe Harbor (in Japan), are outlined in this paper. This connecting bridge has an overall length of 265.56 m, and consists of the main bridge member of asymmetric 2 cable-stayed PC bridge and the 3 cable-stayed PC box member bridge. An asymmetric design was employed for the main bridge frame to ensure the access space for small ships passing between bridge girders, easy maintenance and service, improved economy, and excellent view. The main tower is a single-pillar reinforced concrete structure with an inclination of 15{degree} and 47 m in height. Forty-eight diagonal cables are arranged so that 12 cable trains are connected to the main tower on the right and left sides respectively, and the back-stay cable structure is used for each upper 3 cable trains to improve safety against the earthquake. The main beam is made by a prestressed concrete structure with inverse trapezoidal 3-chamber frame section. This structure is superior in increasing the safety against wind. Steel tube sheet-pile well is selected for the bridge pier base, and debris layer is selected as a support layer for the base. For the construction of the lower bridge section, sand conversion through predrilling of rubble-mound and debris layer was executed. The underwater non-separative concrete and embedded type frame are used around the bridge piers and its surrounding. For the construction of the upper bridge section, steel frames are used inside the main tower to ensure the construction precision. 7 figs.

  12. Electrical Actuation Technology Bridging

    Science.gov (United States)

    Hammond, Monica (Compiler); Sharkey, John (Compiler)

    1993-01-01

    This document contains the proceedings of the NASA Electrical Actuation Technology Bridging (ELA-TB) Workshop held in Huntsville, Alabama, September 29-October 1, 1992. The workshop was sponsored by the NASA Office of Space Systems Development and Marshall Space Flight Center (MSFC). The workshop addressed key technologies bridging the entire field of electrical actuation including systems methodology, control electronics, power source systems, reliability, maintainability, and vehicle health management with special emphasis on thrust vector control (TVC) applications on NASA launch vehicles. Speakers were drawn primarily from industry with participation from universities and government. In addition, prototype hardware demonstrations were held at the MSFC Propulsion Laboratory each afternoon. Splinter sessions held on the final day afforded the opportunity to discuss key issues and to provide overall recommendations. Presentations are included in this document.

  13. BALKANS: Building bridges

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    At a time when upheaval and political unrest in some Balkan countries gives cause for concern, it is good to know that physics, once again, is building bridges between nations. The new international mobility in the region was marked by a major activity of the Balkan Physical Union - the first Balkan School of Physics, held on the banks of the Bosphorus during the first two weeks of September

  14. Feature of extradosed PC bridge and its design; Daihenshin keburu PC kyo no tokucho to sono sekkei

    Energy Technology Data Exchange (ETDEWEB)

    Komiya, M. [Japan Bridge and Structure Institute Inc., Tokyo (Japan)

    1997-03-31

    A PC bridge with the eccentricity of the external cable increased by protruding the deviated member to the outside of the beam for more effective use of the external cable is called a `PC bridge with tendons of large eccentricity.` The extradosed bridge of main beam/cable joint type is a PC bridge with the external cable arranged via a tower-shaped eccentric member provided at the intermediate support, and resembles morphologically a cable stayed bridge having a very low tower. There are two types of extradosed bridges, i.e. a type with concrete coated external cable (cable stayed slab bridge) and the other with non-coated external cable (external cable stayed bridge). Features, structural planning and designing of the general external cable stayed bridge are shown. The features are the possession of intermediate characteristics of those of the PC beam bridge and the PC cable stayed bridge from the viewpoints of structural property, workability, economic efficiency, and scenic property. Outline of the plan, selection of structural data, design of the external cable, and structural characteristics in the ultimate state are discussed. 19 refs., 18 figs., 15 tabs.

  15. Glued structural members

    Science.gov (United States)

    Russell C. Moody; Jen Y. Liu

    1999-01-01

    Glued structural members are manufactured in a variety of configurations. Structural composite lumber (SCL) products consist of small pieces of wood glued together into sizes common for solid-sawn lumber. Glued-laminated timber (glulam) is an engineered stress-rated product that consists of two or more layers of lumber in which the grain of all layers is oriented...

  16. CERN welcomes new members

    Science.gov (United States)

    2017-08-01

    Lithuania is on course to become an associate member of CERN, pending final approval by the Lithuanian parliament. Associate membership will allow representatives of the Baltic nation to take part in meetings of the CERN Council, which oversees the Geneva-based physics lab.

  17. DUBNA: Member States

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The political upheaval in what was the Soviet Union was reflected in an Extraordinary Plenipotentiaries Committee of Joint Institute for Nuclear Research (JINR) Member States, held in Dubna, near Moscow, on 10-13 December, with representatives of eleven sovereign republics of the former Soviet State taking part

  18. Supporting Members and Friends

    Science.gov (United States)

    2005-10-01

    Thank you! Over the past year, AGU has received 12,104 gifts, both large and small, from members and friends. The Union has also received corporate contributions, National Science Foundation grants, and support from the National Oceanographic Partnership Program and National Association of Geoscience Teachers. Together their generosity has benefited AGU non revenue producing programs that are critical to our science and the future health of the Union. The following list gratefully acknowledges annual gifts of $100 or more and cumulative giving of $5,000 or more. The 1919 Society ($100,000 or more) and Benefactors ($5,000-$99,999) recognize single major gifts and cumulative contributions. Three circles acknowledge annual giving: President's Circle ($1,000 or more), Leadership Circle ($200-$999), and Supporters Circle ($100-$199). Supporting Life Members, who contribute a one-time gift of $1,200 in addition to lifetime dues, are among our most loyal Supporters.

  19. Morphological aspects of myocardial bridges.

    Science.gov (United States)

    Lujinović, Almira; Kulenović, Amela; Kapur, Eldan; Gojak, Refet

    2013-11-01

    Although some myocardial bridges can be asymptomatic, their presence often causes coronary disease either through direct compression of the "tunnel" segment or through stimulation and accelerated development of atherosclerosis in the segment proximally to the myocardial bridge. The studied material contained 30 human hearts received from the Department of Anatomy. The hearts were preserved 3 to 5 days in 10% formalin solution. Thereafter, the fatty tissue was removed and arterial blood vessels prepared by careful dissection with special reference to the presence of the myocardial bridges. Length and thickness of the bridges were measured by the precise electronic caliper. The angle between the myocardial bridge fibre axis and other axis of the crossed blood vessel was measured by a goniometer. The presence of the bridges was confirmed in 53.33% of the researched material, most frequently (43.33%) above the anterior interventricular branch. The mean length of the bridges was 14.64 ± 9.03 mm and the mean thickness was 1.23 ± 1.32 mm. Myocardial bridge fibres pass over the descending blood vessel at the angle of 10-90 degrees. The results obtained on a limited sample suggest that the muscular index of myocardial bridge is the highest for bridges located on RIA, but that the difference is not significant in relation to bridges located on other branches. The results obtained suggest that bridges located on other branches, not only those on RIA, could have a great contractive power and, consequently, a great compressive force, which would be exerted on the wall of a crossed blood vessel.

  20. Bridge Aesthetics and Structural Honesty

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1999-01-01

    In bridges the overall form must be chosen with due respect to the transmission of forces if efficient structures shall be created, The design must therefore be governed by experienced structural engineers - in some cases assisted by aesthetic advisers on specific issues. Some basic requirements...... decisive for choosing the form of trusses, arches and cable-stayed bridges are outlined, and several examples show bridges designed without giving priority to the structural aspects....

  1. MODERN ASPECTS OF BRIDGES MONITORING

    Directory of Open Access Journals (Sweden)

    M. I. Kazakevych

    2007-12-01

    Full Text Available The major concepts of the elaboration and realization of the bridge construction monitoring systemic approach are presented in this paper. The main peculiarity of the bridge monitoring modern aspect is pointed out here, namely, the transition from the demands of providing the reliability to the demands of providing the whole complex of the structure consumer qualities. The criteria of diagnostics of the bridge exploitation reliability as the fundamental aim of monitoring are formulated here.

  2. Offers for our members

    CERN Multimedia

    Staff Association

    2018-01-01

    Summer is coming, enjoy our offers for the aquatic parcs! Walibi : Tickets "Zone terrestre": 25 € instead of 31 €. Access to Aqualibi: 5 € instead of 8 € on presentation of your Staff Association member ticket. Free for children under 100 cm. Car park free. * * * * * Aquaparc : Day ticket: – Children: 33 CHF instead of 39 CHF – Adults : 33 CHF instead of 49 CHF Bonus! Free for children under 5.  

  3. Offers for our members

    CERN Multimedia

    Staff Association

    2017-01-01

    Summer is here, enjoy our offers for the aquatic parcs! Walibi : Tickets "Zone terrestre": 24 € instead of 30 €. Access to Aqualibi: 5 € instead of 6 € on presentation of your SA member ticket. Free for children under 100 cm. Car park free. * * * * * Aquaparc : Day ticket: – Children: 33 CHF instead of 39 CHF – Adults : 33 CHF instead of 49 CHF Bonus! Free for children under 5.

  4. Offers for our members

    CERN Multimedia

    Staff Association

    2017-01-01

    Summer is coming, enjoy our offers for the aquatic parcs! Walibi : Tickets "Zone terrestre": 24 € instead of 30 €. Access to Aqualibi: 5 € instead of 6 € on presentation of your SA member ticket. Free for children under 100 cm. Car park free. * * * * * Aquaparc : Day ticket: – Children: 33 CHF instead of 39 CHF – Adults : 33 CHF instead of 49 CHF Bonus! Free for children under 5.

  5. [Comment on] BOSP members

    Science.gov (United States)

    Richman, Barbara T.

    The new Board on Ocean Science and Policy (BOSP) (Eos, June 7, 1983, p. 402) met for the first time on May 4. John B. Slaughter, former director of the National Science Foundation and now chancellor of the University of Maryland in College Park, is the board's chairman. Other board members are D. James Baker, Jr. (University of Washington, Seattle); Kirk Bryan (Geophysical Fluid Dynamics Laboratory, Princeton University); John P. Craven (University of Hawaii); Charles L. Drake (Dartmouth College); Paul M. Fye (Woods Hole Oceanographic Institution); Edward D. Goldberg (Scripps Institution of Oceanography); G. Ross Heath (Oregon State University); Judith T. Kildow (Massachusetts Institute of Technology); John A. Knauss (University of Rhode Island); James J. McCarthy (Museum of Comparative Zoology, Harvard University); H. William Menard (Scripps Institution of Oceanography); C. Barry Raleigh (Lamont-Doherty Geological Observatory); Roger Revelle (University of California, San Diego); David A. Ross (Woods Hole Oceanographic Institution); Brian J. Rothschild (University of Maryland); William M. Sackett (University of South Florida); John H. Steele (Woods Hole Oceanographic Institution); and Carl Wunsch (MIT). Wallace Broecker (Lamont-Doherty Geological Observatory), an original board member, resigned after the first meeting. Broecker told Eos that combining the science and policy boards resulted in a new board whose mission is too broad. A new board member will be appointed in Broecker's place

  6. Steel-soil composite bridge

    DEFF Research Database (Denmark)

    Du, Guangli; Pettersson, Lars; Karoumi, Raid

    2017-01-01

    viability, while their environmental performance is overlooked. Today’s designers are urged to seek new design options to reduce the environmental burdens. Sweden owns more than 24574 bridges and most of them are short spans. Among them, the slab frame bridge (CFB) is a common solution. Soil steel composite...... bridge (SSCB), alternatively, is a functionally equivalent solution to CFB and shows advantages in low cost and easy construction. This paper compares the environmental performance between these two bridge types based on life cycle assessment (LCA). The analysis and result shows that, the SSCB...

  7. Bridge Crossing Simulator

    Science.gov (United States)

    2014-10-07

    is counted as. Per the TDTC, a test bridge with longitudinal and/or lateral symmetry under non- eccentric loading can be considered as 1, 2, or 4...Level Run036 3 MLC70T (tracked) BA Run046 6 AB Run055 9 AB Run060 9 BA Run064 12 BA Run071 15 AB Run155 3 MLC96W ( wheeled ) AB...Run331 9 AB Run359 15 AB Run430 12 MLC96W ( wheeled ) BA Run434 12 AB Run447 3 BA Bank Condition: Side Slope, Even Strain Channels High

  8. Consideration on extradosed prestressed concrete road bridge; Dorokyo ni okeru daihenshin PC keburu kyo

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, A.; Honma, A. [Japan Highway Public Corp., Tokyo (Japan)

    1997-03-31

    The details of the investigation on the Odawara Blue Way Bridge for which extradosed type is employed are provided, and a report is made about the situation of the study on the future construction of the 2nd Tomei-Meishin Expressway. The extradosed PC bridge is considered to have intermediate structural characteristics of those of the conventional beam bridge and PC cable stayed bridge, and is expected to be applied to bridges having approximately from 100 to 200m span. The features of the extradosed PC bridge is outlined. Approximately 1/35 beam height on the intermediate support and 1/10 main tower height against the center span are considered to be proper. PC steel products can be used efficiently because stress fluctuation of diagonals and the load sharing rate of the diagonal member are less than those of the PC cable stayed bridge and safety factor similar to that of general internal cable can be adopted. Construction works for the main tower and the diagonal member are easy due to low height of the main tower, and the bridge is advantageous also in the maintenance control because no beam is required. 5 refs., 8 figs., 2 tabs.

  9. Nondestructive testing of a weld repair on the I-65 Bridge over the Ohio River at Louisville.

    Science.gov (United States)

    2009-06-01

    Nondestructive evaluation methods were applied to verify the structural integrity of a fracture critical structural member on the I-65 John F. Kennedy Memorial Bridge over the Ohio River at Louisville. Several nondestructive evaluation methods includ...

  10. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  11. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  12. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Science.gov (United States)

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  13. The Members of the Agency

    International Nuclear Information System (INIS)

    2007-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.63) is Palau which deposited its Instrument of Acceptance of the Statute on 2 March 2007. The Attachment hereto shows the dates on which the present 144 Member States became Members

  14. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.67) is Cambodia which deposited its Instrument of Acceptance of the Statute on 23 November 2009. The Attachment hereto shows the dates on which the present 151 Member States became Members

  15. The Members of the Agency

    International Nuclear Information System (INIS)

    2008-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.64) is Nepal which deposited its Instrument of Acceptance of the Statute on 8 July 2008. The Attachment hereto shows the dates on which the present 145 Member States became Members

  16. The Members of the Agency

    International Nuclear Information System (INIS)

    2006-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.61) are Belize, Mozambique and Malawi, which deposited their Instruments of Acceptance of the Statute on 31 March 2006, 18 September 2006 and 2 October 2006 respectively. The Attachment hereto shows the dates on which the present 142 Member States became Members

  17. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.66) are Bahrain, Burundi, Congo and Lesotho which deposited their Instruments of Acceptance of the Statute on 23 June 2009, 24 June 2009, 15 July 2009 and 13 July 2009, respectively. The Attachment hereto shows the dates on which the present 150 Member States became Members

  18. The Members of the Agency

    International Nuclear Information System (INIS)

    2006-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.62) is Montenegro which deposited its Instrument of Acceptance of the Statute on 30 October 2006. The Attachment hereto shows the dates on which the present 143 Member States became Members

  19. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.66) are Bahrain, Burundi, Congo and Lesotho which deposited their Instruments of Acceptance of the Statute on 23 June 2009, 24 June 2009, 15 July 2009 and 13 July 2009, respectively. The Attachment hereto shows the dates on which the present 150 Member States became Members [ru

  20. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.67) is Cambodia which deposited its Instrument of Acceptance of the Statute on 23 November 2009. The Attachment hereto shows the dates on which the present 151 Member States became Members [fr

  1. The Members of the Agency

    International Nuclear Information System (INIS)

    2006-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.61) are Belize, Mozambique and Malawi, which deposited their Instruments of Acceptance of the Statute on 31 March 2006, 18 September 2006 and 2 October 2006 respectively. The Attachment hereto shows the dates on which the present 142 Member States became Members [fr

  2. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.66) are Bahrain, Burundi, Congo and Lesotho which deposited their Instruments of Acceptance of the Statute on 23 June 2009, 24 June 2009, 15 July 2009 and 13 July 2009, respectively. The Attachment hereto shows the dates on which the present 150 Member States became Members [fr

  3. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.65) is the Sultanate of Oman which deposited its Instrument of Acceptance of the Statute on 5 February 2009. The Attachment hereto shows the dates on which the present 146 Member States became Members [fr

  4. The Members of the Agency

    International Nuclear Information System (INIS)

    2005-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.59) is the Islamic Republic of Mauritania, which deposited the instrument of acceptance of the Statute on 23 November 2004. The Attachment hereto shows the dates on which the present 138 Member States became Members

  5. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.66) are Bahrain, Burundi, Congo and Lesotho which deposited their Instruments of Acceptance of the Statute on 23 June 2009, 24 June 2009, 15 July 2009 and 13 July 2009, respectively. The Attachment hereto shows the dates on which the present 150 Member States became Members [es

  6. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.67) is Cambodia which deposited its Instrument of Acceptance of the Statute on 23 November 2009. The Attachment hereto shows the dates on which the present 151 Member States became Members [es

  7. The Members of the Agency

    International Nuclear Information System (INIS)

    2006-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.60) is Chad, which deposited the instrument of acceptance of the Statute on 2 November 2005. The Attachment hereto shows the dates on which the present 139 Member States became Members

  8. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.65) is the Sultanate of Oman which deposited its Instrument of Acceptance of the Statute on 5 February 2009. The Attachment hereto shows the dates on which the present 146 Member States became Members [es

  9. The Members of the Agency

    International Nuclear Information System (INIS)

    2003-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.58) is Kyrgyzstan, which deposited the instrument of acceptance of the Statute on 10 September 2003. The list shows the dates on which the present 137 Member States became Members

  10. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.65) is the Sultanate of Oman which deposited its Instrument of Acceptance of the Statute on 5 February 2009. The Attachment hereto shows the dates on which the present 146 Member States became Members

  11. The Members of the Agency

    International Nuclear Information System (INIS)

    2009-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.67) is Cambodia which deposited its Instrument of Acceptance of the Statute on 23 November 2009. The Attachment hereto shows the dates on which the present 151 Member States became Members [ru

  12. Offers for our members

    CERN Multimedia

    Staff Association

    2013-01-01

    Summer is here, enjoy our offers for the aquatic parcs! Walibi : Tickets "Zone terrestre": 21 € instead of 26 €. Access to Aqualibi: 5 € instead of 8 € on presentation of your SA member ticket. Free for children (3-11 years old) before 12 h 00. Free for children under 3, with limited access to the attractions. Car park free. * * * * * Aquaparc : Day ticket: – Children: 30 CHF instead of 39 CHF – Adults : 36 CHF instead of 49 CHF Bonus! Free for children under 5.

  13. Offers for our members

    CERN Multimedia

    Staff Association

    2015-01-01

    Summer is here, enjoy our offers for the aquatic parcs! Walibi : Tickets "Zone terrestre": 21,50 € instead of 27 €. Access to Aqualibi: 5 € instead of 6 € on presentation of your SA member ticket. Free for children (3-11 years old) before 12:00 p.m. Free for children under 3, with limited access to the attractions. Car park free. * * * * * Aquaparc : Day ticket: – Children: 33 CHF instead of 39 CHF – Adults : 33 CHF instead of 49 CHF Bonus! Free for children under 5.

  14. Offers for our members

    CERN Multimedia

    Staff Association

    2016-01-01

    Summer is here, enjoy our offers for the aquatic parcs! Walibi : Tickets "Zone terrestre": 23 € instead of 29 €. Access to Aqualibi: 5 € instead of 6 € on presentation of your SA member ticket. Free for children (3-11 years old) before 12:00 p.m. Free for children under 3, with limited access to the attractions. Car park free. * * * * * Aquaparc : Day ticket: – Children: 33 CHF instead of 39 CHF – Adults : 33 CHF instead of 49 CHF Bonus! Free for children under 5.

  15. Cryogenic support member

    International Nuclear Information System (INIS)

    Niemann, R.C.; Gonczy, J.D.; Nicol, T.H.

    1987-01-01

    A cryogenic support member is described for restraining a cryogenic system comprising; a rod having a depression at a first end. The rod is made of non-metallic material. The non-metallic material has an effectively low thermal conductivity; a metallic plug; and a metallic sleeve. The plug and the sleeve are shrink-fitted to the depression in the rod and assembled thereto such that the plug is disposed inside the depression of the rod. The sleeve is disposed over the depression in the rod and the rod is clamped therebetween. The shrink-fit clamping the rod is generated between the metallic plug and the metallic sleeve

  16. Monitoring bridge scour using fiber optic sensors.

    Science.gov (United States)

    2015-04-01

    The scouring process excavates and carries away materials from the bed and banks of streams, and from : around the piers and abutments of bridges. Scour undermines bridges and may cause bridge failures due to : structural instability. In the last 30 ...

  17. Faster bridge construction using precast substructures : brief.

    Science.gov (United States)

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  18. Lean Construction Applications for Bridge Inspection

    Science.gov (United States)

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  19. Thermal effects in concrete members

    International Nuclear Information System (INIS)

    Kar, A.K.

    1977-01-01

    When subjected to temperature changes and restrained from free movement, a member develops stresses. Restrained members are sometimes assumed to act independently of other members. A method of analysis and design for thermal stresses in such members is provided. The method of analysis, based on the ultimate strength concept, greatly reduces the computational efforts for determining thermal effects in concrete members. Available charts and tables and the recommendations given herein simplify the design. (Auth.)

  20. The violin bridge as filter.

    Science.gov (United States)

    Bissinger, George

    2006-07-01

    The violin bridge filter role was investigated using modal and acoustic measurements on 12 quality-rated violins combined with systematic bridge rocking frequency f(rock) and wing mass decrements deltam on four bridges for two other violins. No isolated bridge resonances were observed; bridge motions were complex (including a "squat" mode near 0.8 kHz) except for low frequency rigid body pivot motions, all more or less resembling rocking motion at higher frequencies. A conspicuous broad peak near 2.3 kHz in bridge driving point mobility (labeled BH) was seen for good and bad violins. Similar structure was seen in averaged bridge, bridge feet, corpus mobilities and averaged radiativity. No correlation between violin quality and BH driving point, averaged corpus mobility magnitude, or radiativity was found. Increasing averaged-over-f(rock) deltam(g) from 0 to 0.12 generally increased radiativity across the spectrum. Decreasing averaged-over-deltam f(rock) from 3.6 to 2.6 kHz produced consistent decreases in radiativity between 3 and 4.2 kHz, but only few-percent decreases in BH frequency. The lowest f(rock) values were accompanied by significantly reduced radiation from the Helmholtz A0 mode near 280 Hz; this, combined with reduced high frequency output, created overall radiativity profiles quite similar to "bad" violins among the quality-rated violins.

  1. Fatigue test on aluminium bridges

    NARCIS (Netherlands)

    Maljaars, J.; Soetens, F.; Straalen, van IJ.J.

    2005-01-01

    Traffic bridges are subjected to variable loads and should therefore be checked on fatigue. Especially low weight materials, like aluminium, are sensitive to fatigue, because the variable load is a substantial part of the total load. This paper shows the structural design of an aluminium bridge

  2. Vulnerability of bridges to fire

    DEFF Research Database (Denmark)

    Giuliani, Luisa; Crosti, C.; Gentili, F.

    2012-01-01

    Even if recent effort in developing methodology and measures for design structures against fire and explosions has been mostly focused on buildings, bridges can also be very sensitive to those actions, as witnesses by some recent bridge accidents, which caused major economic losses and also endan...

  3. Fatigue evaluation for Tsing Ma Bridge using structural health monitoring data

    Science.gov (United States)

    Chan, Hung-tin Tommy; Ko, Jan Ming; Li, Zhao-Xia

    2001-08-01

    Fatigue assessment for the Tsing Ma Bridge (TMB) are presented based on the British standard BS5400 and the real-time structural health monitoring data under railway loading. TMB, as an essential portion of transport network for the Hong Kong airport, is the longest suspension bridge in the world carrying both highway and railway traffic. The bridge design has been mainly based on BS5400. A structural health monitoring system - Wind and Structural Health Monitoring System (WASHMS) for TMB has been operated since the bridge commissioning in May 1997. In order to assess the fatigue behavior of TMB under railway loading, strain gauges were installed on the bridge deck to measure the strain-time histories as soon as the bridge is loaded by a standard railway loading due to the service of an actual train. The strain-time history data at the critical members are then used to determine the stress spectrum, of which the rainflow method recommended for railway bridges by BS5400 is applied to count cycles of stress range. Miner's law is employed to evaluate fatigue damage and remaining service life of the bridge. The evaluated results of fatigue damage and remaining service life would help us to well understand about the fatigue design of the bridge and status in fatigue accumulation.

  4. A new multiconstraint method for determining the optimal cable stresses in cable-stayed bridges.

    Science.gov (United States)

    Asgari, B; Osman, S A; Adnan, A

    2014-01-01

    Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM). The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  5. A New Multiconstraint Method for Determining the Optimal Cable Stresses in Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    B. Asgari

    2014-01-01

    Full Text Available Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM. The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  6. Superconductivity in small metal bridges

    International Nuclear Information System (INIS)

    Hannah, E.C.

    1975-01-01

    Josephson effects in weaklinks are discussed for low and high frequency regimes using simple perturbation techniques. It is proven that no measurement of the supercurrent dependence upon frequency above the Riedel peak frequency can be made using rf sources whose frequencies are below the Riedel peak. Thus the bulk of work done in the field on the high frequency structure of the Josephson current is shown to be invalid. Metal bridges shorter than a newly defined temperature independent length for superconductors, l/sub PHONON/, are proven to be identical in their Josephson current behavior to tunneling junctions. The BCS gap equation is generalized to include voltage gradient effects on pairs within the bridge. The oscillation frequency for long bridges (l/sub BRIDGE/ greater than l/sub PHONON/) is shown to be limited to less than 10'' Hz. An experimental test of the new voltage dependent gap is made as well as tests of the pair reforming time of bridges

  7. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  8. Numerical investigation into thermal load responses of steel railway bridge

    Science.gov (United States)

    Saravana Raja Mohan, K.; Sreemathy, J. R.; Saravanan, U.

    2017-07-01

    Bridge design requires consideration of the effects produced by temperature variations and the resultant thermal gradients in the structure. Temperature fluctuation leads to expansion and contraction of bridges and these movements are taken care by providing expansion joints and bearings. Free movements of a member can be restrained by imposing certain boundary condition but at the same time considerable allowances should be made for the stresses resulting from this restrained condition since the additional deformations and stresses produced may affect the ultimate and serviceability limit states of the structure. If the reaction force generated by the restraints is very large, then its omission can lead to unsafe design. The principal objective of this research is to study the effects of temperature variation on stresses and deflection in a steel railway bridge. A numerical model, based on finite element analysis is presented for evaluating the thermal performance of the bridge. The selected bridge is analyzed and the temperature field distribution and the corresponding thermal stresses and strains are calculated using the finite element software ABAQUS. A thorough understanding of the thermal load responses of a structure will result in safer and dependable design practices.

  9. Evaluating the performance of skewed prestressed concrete bridge after strengthening

    Science.gov (United States)

    Naser, Ali Fadhil; Zonglin, Wang

    2013-06-01

    The objectives of this paper are to explain the application of repairing and strengthening methods on the damaged members of the bridge structure, to analyze the static and dynamic structural response under static and dynamic loads after strengthening, and to evaluate the structural performance after application of strengthening method. The repairing and strengthening methods which are used in this study include treatment of the cracks, thickening the web of box girder along the bridge length and adding internal pre-stressing tendons in the thickening web, and construct reinforced concrete cross beams (diaphragms) between two box girders. The results of theoretical analysis of static and dynamic structural responses after strengthening show that the tensile stresses are decreased and become less than the allowable limit values in the codes. The values of vertical deflection are decreased after strengthening. The values of natural frequencies after strengthening are increased, indicating that the strengthening method is effective to reduce the vibration of the bridge structure. Therefore, the strengthening methods are effective to improve the bearing capacity and elastic working state of the bridge structure and to increase the service life of the bridge structure.

  10. Bridging the Evaluation Gap

    Directory of Open Access Journals (Sweden)

    Paul Wouters

    2017-02-01

    Full Text Available Paul Wouters’ essay is concerned with bridging the gap between what we value in our academic work and how we are assessed in formal evaluation exercises. He reflects on the recent evaluation of his own center, and reminds us that it is productive to see evaluations not as the (obviously impossible attempt to produce a true representation of past work, but rather as the exploration and performance of “who one wants to be.” Reflecting on why STS should do more than just play along to survive in the indicator game, he suggests that our field should contribute to changing its very rules. In this endeavor, the attitude and sensibilities developed in our field may be more important than any specific theoretical concepts or methodologies.

  11. Linguistic Barriers and Bridges

    DEFF Research Database (Denmark)

    Thuesen, Frederik

    2016-01-01

    The influence of language on social capital in low-skill and ethnically diverse workplaces has thus far received very limited attention within the sociology of work. As the ethnically diverse workplace is an important social space for the construction of social relations bridging different social...... groups, the sociology of work needs to develop a better understanding of the way in which linguistic diversity influences the formation of social capital, i.e. resources such as the trust and reciprocity inherent in social relations in such workplaces. Drawing on theories about intergroup contact...... and intercultural communication, this article analyses interviews with 31 employees from two highly ethnically diverse Danish workplaces. The article shows how linguistic barriers such as different levels of majority language competence and their consequent misunderstandings breed mistrust and hostility, whilst...

  12. Majorana entanglement bridge

    Science.gov (United States)

    Plugge, Stephan; Zazunov, Alex; Sodano, Pasquale; Egger, Reinhold

    2015-06-01

    We study the concurrence of entanglement between two quantum dots in contact to Majorana bound states on a floating superconducting island. The distance between the Majorana states, the charging energy of the island, and the average island charge are shown to be decisive parameters for the efficiency of entanglement generation. We find that long-range entanglement with basically distance-independent concurrence is possible over wide parameter regions, where the proposed setup realizes a "Majorana entanglement bridge." We also study the time-dependent concurrence obtained after one of the tunnel couplings is suddenly switched on, which reveals the time scales for generating entanglement. Accurate analytical expressions for the concurrence are derived both for the static and the time-dependent cases. Our results indicate that entanglement formation in interacting Majorana devices can be fully understood in terms of an interplay of elastic cotunneling (also referred to as "teleportation") and crossed Andreev reflection processes.

  13. Electrothermally Tunable Bridge Resonator

    KAUST Repository

    Hajjaj, Amal Z.; Alcheikh, Nouha; Ramini, Abdallah; Hafiz, Md Abdullah Al; Younis, Mohammad I.

    2016-01-01

    This paper demonstrates experimentally, theoretically, and numerically a wide-range tunability of an in-plane clamped-clamped microbeam, bridge, and resonator compressed by a force due to electrothermal actuation. We demonstrate that a single resonator can be operated at a wide range of frequencies. The microbeam is actuated electrothermally, by passing a DC current through it. We show that when increasing the electrothermal voltage, the compressive stress inside the microbeam increases, which leads eventually to its buckling. Before buckling, the fundamental frequency decreases until it drops to very low values, almost to zero. After buckling, the fundamental frequency increases, which is shown to be as high as twice the original resonance frequency. Analytical results based on the Galerkin discretization of the Euler Bernoulli beam theory are generated and compared to the experimental data and to simulation results of a multi-physics finite-element model. A good agreement is found among all the results.

  14. Electrothermally Tunable Bridge Resonator

    KAUST Repository

    Hajjaj, Amal Z.

    2016-12-05

    This paper demonstrates experimentally, theoretically, and numerically a wide-range tunability of an in-plane clamped-clamped microbeam, bridge, and resonator compressed by a force due to electrothermal actuation. We demonstrate that a single resonator can be operated at a wide range of frequencies. The microbeam is actuated electrothermally, by passing a DC current through it. We show that when increasing the electrothermal voltage, the compressive stress inside the microbeam increases, which leads eventually to its buckling. Before buckling, the fundamental frequency decreases until it drops to very low values, almost to zero. After buckling, the fundamental frequency increases, which is shown to be as high as twice the original resonance frequency. Analytical results based on the Galerkin discretization of the Euler Bernoulli beam theory are generated and compared to the experimental data and to simulation results of a multi-physics finite-element model. A good agreement is found among all the results.

  15. Half Bridge Inductive Heater

    Directory of Open Access Journals (Sweden)

    Zoltán GERMÁN-SALLÓ

    2015-12-01

    Full Text Available Induction heating performs contactless, efficient and fast heating of conductive materials, therefore became one of the preferred heating procedure in industrial, domestic and medical applications. During induction heating the high-frequency alternating currents that heat the material are induced by means of electromagnetic induction. The material to be heated is placed inside the time-varying magnetic field generated by applying a highfrequency alternating current to an induction coil. The alternating electromagnetic field induces eddy currents in the workpiece, resulting resistive losses, which then heat the material. This paper describes the design of a power electronic converter circuit for induction heating equipment and presents the obtained results. The realized circuit is a low power half bridge resonant inverter which uses power MOS transistors and adequate driver circuits.

  16. Offers for our members

    CERN Multimedia

    Staff Association

    2013-01-01

    The Courir shops propose the following offer: 15% discount on all articles (not on sales) in the Courir shops (Val Thoiry, Annemasse and Neydens) and 5% discount on sales upon presentation of your Staff Association membership card and an identity card before payment. Summer is here, enjoy our offers for the aquatic parcs! Walibi : Tickets "Zone terrestre": 21 € instead of 26 €. Access to Aqualibi: 5 € instead of 8 € on presentation of your SA member ticket. Free for children (3-11 years old) before 12 h 00. Free for children under 3, with limited access to the attractions. Car park free. * * * * * Aquaparc : Day ticket: – Children: 30 CHF instead of 39 CHF – Adults : 36 CHF instead of 49 CHF Bonus! Free for children under 5.

  17. Offers for our members

    CERN Multimedia

    Association du personnel

    2013-01-01

    La banque LCL propose aux membres de l’Association du personnel les avantages suivants : – Un barème Privilège sur le Prêt immobilier – Des avantages tarifaires sur l’épargne, notamment l’assurance-vie. – Un taux préférentiel de prêt à la consommation. En outre, jusqu’au 30 septembre 2013, elle offre 50€ à tous les nouveaux clients, membres de l'Association du personnel. Summer is here, enjoy our offers for the aquatic parcs! Tickets "Zone terrestre" : 21 € instead of de 26 €. Access to Aqualibi : 5 euros instead of 8 euros on presentation of your SA member ticket. Free for children (3-11 years old) before 12 h 00. Free for children under 3, with limited access to the attractions. Free car park. * * * * * * * Full day ticket: – Children : 30 CHF instead of 39 CHF &...

  18. Offers for our members

    CERN Multimedia

    Staff Association

    2013-01-01

    The warm weather arrives, it's time to take advantage of our offers Walibi and Aquapark! Walibi : Tickets "Zone terrestre": 21 € instead of 26 € Access to Aqualibi: 5 € instead of 8 € on presentation of your SA member ticket. Free for children (3-11 years old) before 12 h 00. Free for children under 3, with limited access to the attractions. Car park free. * * * * * Aquaparc : Half-day ticket (5 hours): – Children: 26 CHF instead of 35 CHF – Adults : 32 CHF instead of 43 CHF Day ticket: – Children: 30 CHF instead of 39 CHF – Adults : 36 CHF instead of 49 CHF Free for children under 5.

  19. Cascaded resonant bridge converters

    Science.gov (United States)

    Stuart, Thomas A. (Inventor)

    1989-01-01

    A converter for converting a low voltage direct current power source to a higher voltage, high frequency alternating current output for use in an electrical system where it is desired to use low weight cables and other circuit elements. The converter has a first stage series resonant (Schwarz) converter which converts the direct current power source to an alternating current by means of switching elements that are operated by a variable frequency voltage regulator, a transformer to step up the voltage of the alternating current, and a rectifier bridge to convert the alternating current to a direct current first stage output. The converter further has a second stage series resonant (Schwarz) converter which is connected in series to the first stage converter to receive its direct current output and convert it to a second stage high frequency alternating current output by means of switching elements that are operated by a fixed frequency oscillator. The voltage of the second stage output is controlled at a relatively constant value by controlling the first stage output voltage, which is accomplished by controlling the frequency of the first stage variable frequency voltage controller in response to second stage voltage. Fault tolerance in the event of a load short circuit is provided by making the operation of the first stage variable frequency voltage controller responsive to first and second stage current limiting devices. The second stage output is connected to a rectifier bridge whose output is connected to the input of the second stage to provide good regulation of output voltage wave form at low system loads.

  20. Strengthening of Existing Bridge Structures for Shear and Bending with Carbon Textile-Reinforced Mortar

    Directory of Open Access Journals (Sweden)

    Martin Herbrand

    2017-09-01

    Full Text Available Increasing traffic loads and changes in code provisions lead to deficits in shear and flexural capacity of many existing highway bridges. Therefore, a large number of structures are expected to require refurbishment and strengthening in the future. This projection is based on the current condition of many older road bridges. Different strengthening methods for bridges exist to extend their service life, all having specific advantages and disadvantages. By applying a thin layer of carbon textile-reinforced mortar (CTRM to bridge deck slabs and the webs of pre-stressed concrete bridges, the fatigue and ultimate strength of these members can be increased significantly. The CTRM layer is a combination of a corrosion resistant carbon fiber reinforced polymer (CFRP fabric and an efficient mortar. In this paper, the strengthening method and the experimental results obtained at RWTH Aachen University are presented.

  1. Strengthening of Existing Bridge Structures for Shear and Bending with Carbon Textile-Reinforced Mortar.

    Science.gov (United States)

    Herbrand, Martin; Adam, Viviane; Classen, Martin; Kueres, Dominik; Hegger, Josef

    2017-09-19

    Increasing traffic loads and changes in code provisions lead to deficits in shear and flexural capacity of many existing highway bridges. Therefore, a large number of structures are expected to require refurbishment and strengthening in the future. This projection is based on the current condition of many older road bridges. Different strengthening methods for bridges exist to extend their service life, all having specific advantages and disadvantages. By applying a thin layer of carbon textile-reinforced mortar (CTRM) to bridge deck slabs and the webs of pre-stressed concrete bridges, the fatigue and ultimate strength of these members can be increased significantly. The CTRM layer is a combination of a corrosion resistant carbon fiber reinforced polymer (CFRP) fabric and an efficient mortar. In this paper, the strengthening method and the experimental results obtained at RWTH Aachen University are presented.

  2. Experimental Analysis of Stiffness of the Riveted Steel Railway Bridge Deck Members’ Joints

    Directory of Open Access Journals (Sweden)

    Gocál Jozef

    2014-12-01

    Full Text Available The paper deals with the real behaviour of the riveted steel railway bridge deck members’ connections with respect to their bending stiffness. Attention is paid to the stringer-to-cross beam connection as well as the cross beam-to-main girder connection. The stiffness of the two connections is investigated on the basis of evaluation of the experimentally determined stress response of the observed structural members to the actual traffic load on an existing railway bridge.

  3. Wright-Fisher diffusion bridges.

    Science.gov (United States)

    Griffiths, Robert C; Jenkins, Paul A; Spanò, Dario

    2017-10-06

    The trajectory of the frequency of an allele which begins at x at time 0 and is known to have frequency z at time T can be modelled by the bridge process of the Wright-Fisher diffusion. Bridges when x=z=0 are particularly interesting because they model the trajectory of the frequency of an allele which appears at a time, then is lost by random drift or mutation after a time T. The coalescent genealogy back in time of a population in a neutral Wright-Fisher diffusion process is well understood. In this paper we obtain a new interpretation of the coalescent genealogy of the population in a bridge from a time t∈(0,T). In a bridge with allele frequencies of 0 at times 0 and T the coalescence structure is that the population coalesces in two directions from t to 0 and t to T such that there is just one lineage of the allele under consideration at times 0 and T. The genealogy in Wright-Fisher diffusion bridges with selection is more complex than in the neutral model, but still with the property of the population branching and coalescing in two directions from time t∈(0,T). The density of the frequency of an allele at time t is expressed in a way that shows coalescence in the two directions. A new algorithm for exact simulation of a neutral Wright-Fisher bridge is derived. This follows from knowing the density of the frequency in a bridge and exact simulation from the Wright-Fisher diffusion. The genealogy of the neutral Wright-Fisher bridge is also modelled by branching Pólya urns, extending a representation in a Wright-Fisher diffusion. This is a new very interesting representation that relates Wright-Fisher bridges to classical urn models in a Bayesian setting. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Bridge Creek IMW database - Bridge Creek Restoration and Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The incised and degraded habitat of Bridge Creek is thought to be limiting a population of ESA-listed steelhead (Oncorhynchus mykiss). A logical restoration approach...

  5. Reliability Assessment of Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Middleton, C. R.

    This paper is partly based on research performed for the Highways Agency, London, UK under the project DPU/9/44 "Revision of Bridge Assessment Rules Based on Whole Life Performance: concrete bridges". It contains the details of a methodology which can be used to generate Whole Life (WL) reliability...... profiles. These WL reliability profiles may be used to establish revised rules for concrete bridges. This paper is to some extend based on Thoft-Christensen et. al. [1996], Thoft-Christensen [1996] et. al. and Thoft-Christensen [1996]....

  6. Complex Testing of the Bridges

    Directory of Open Access Journals (Sweden)

    Savić Adrijana

    2016-01-01

    Full Text Available This article describes the process of examining bridges. AB road bridge, founded on the columns by the Karpoš system and damaged due to erosive action of the river, is given as an example. The first tests of the bridge are conducted on the impact load of V 300, because of the appearance of longitudinal cracks. The results of the columns testing are presented in this paper, as well as the rehabilitation measures thus increasing the load capacity of the column.

  7. The Members of the Agency

    International Nuclear Information System (INIS)

    2003-01-01

    The document lists the 135 Member States of the Agency as of 19 March 2003. The new Member since the last issue of the list (INFCIRC/2/56) is the Republic of Honduras. The dates on which the present 135 Member States became Members are given in an Attachment. It also shows the States whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute

  8. The Members of the Agency

    International Nuclear Information System (INIS)

    1999-01-01

    The document lists the 130 Member States of the Agency as of 1 December 1999. The new Member since the last issue of the list (INFCIRC/2/52) is Angola. The dates on which the present 130 Member States became Members, and the state Honduras) whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute are given in an Attachment

  9. The Members of the Agency

    International Nuclear Information System (INIS)

    2002-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.55) is the Republic of Botswana, which deposited the instrument of acceptance of the Statute on 20 March 2002. The Attachment hereto shows the dates on which the present 134 Member States became Members. It also shows the State whose application for membership of the Agency has been approved by the General Conference, but which has not yet deposited an instrument of acceptance of the Statute

  10. The Members of the Agency

    International Nuclear Information System (INIS)

    2001-01-01

    The document lists the 132 Member States of the Agency as of 1 June 2001. The new Members since the last issue of the list (INFCIRC/2/53) are Central African Republic and Azerbaijan. The dates on which the present 132 Member States became Members are given in an Attachment. It also shows the States whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute

  11. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.69) is the Commonwealth of Dominica, which deposited its instrument of acceptance of the Statute on 17 February 2012. The Attachment hereto shows the dates on which the present 153 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  12. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.70) is Papua New Guinea, which deposited its instrument of acceptance of the Statute on 4 April 2012. The Attachment hereto shows the dates on which the present 154 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  13. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.69) is the Commonwealth of Dominica, which deposited its instrument of acceptance of the Statute on 17 February 2012. The Attachment hereto shows the dates on which the present 153 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [es

  14. The Members of the Agency

    International Nuclear Information System (INIS)

    2013-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.74) is Swaziland, which deposited its instrument of acceptance of the Statute on 15 February 2013. The Attachment hereto shows the dates on which the present 159 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  15. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.71) is Rwanda, which deposited its instrument of acceptance of the Statute on 4 September 2012. The Attachment hereto shows the dates on which the present 155 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  16. The Members of the Agency

    International Nuclear Information System (INIS)

    2011-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.68) is the Lao People's Democratic Republic which deposited its instrument of acceptance of the Statute on 4 November 2011. The Attachment hereto shows the dates on which the present 152 Member States deposited instruments of ratification or acceptance of the Statue with the depositary Government [fr

  17. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.73) is Trinidad and Tobago, which deposited its instrument of acceptance of the Statute on 9 November 2012. The Attachment hereto shows the dates on which the present 158 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [fr

  18. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.70) is Papua New Guinea, which deposited its instrument of acceptance of the Statute on 4 April 2012. The Attachment hereto shows the dates on which the present 154 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [ru

  19. Family members' experiences of autopsy

    NARCIS (Netherlands)

    Oppewal, F; Meyboom-de Jong, B

    Background. The experiences of family members will teach us how to handle an autopsy, the ultimate quality assessment tool. Objective. The aim of this study was to determine surviving family members' experience of autopsy. Method. Seven GPs were asked to approach surviving family members of

  20. The Members of the Agency

    International Nuclear Information System (INIS)

    2014-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.76) is Brunei Darussalam, which deposited its instrument of acceptance of the Statute on 18 February 2014. The Attachment hereto shows the dates on which the present 162 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [fr

  1. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.70) is Papua New Guinea, which deposited its instrument of acceptance of the Statute on 4 April 2012. The Attachment hereto shows the dates on which the present 154 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [fr

  2. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.71) is Rwanda, which deposited its instrument of acceptance of the Statute on 4 September 2012. The Attachment hereto shows the dates on which the present 155 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [fr

  3. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.69) is the Commonwealth of Dominica, which deposited its instrument of acceptance of the Statute on 17 February 2012. The Attachment hereto shows the dates on which the present 153 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [fr

  4. The members of the Agency

    International Nuclear Information System (INIS)

    1993-01-01

    The 42nd revision of INFCIRC/2 lists the 113 Member States of the International Atomic Energy Agency as of 1 January 1993. It includes Slovenia as a new Member State as of 21 September 1992, Cambodia replaces the former name ''Democratic Kampuchea'' and Czechoslovakia was deleted as it ceased to be a member of the Agency as of 1 January 1993 (INFCIRC/417)

  5. The Members of the Agency

    International Nuclear Information System (INIS)

    2011-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.68) is the Lao People's Democratic Republic which deposited its instrument of acceptance of the Statute on 4 November 2011. The Attachment hereto shows the dates on which the present 152 Member States deposited instruments of ratification or acceptance of the Statue with the depositary Government [es

  6. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.73) is Trinidad and Tobago, which deposited its instrument of acceptance of the Statute on 9 November 2012. The Attachment hereto shows the dates on which the present 158 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [es

  7. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.70) is Papua New Guinea, which deposited its instrument of acceptance of the Statute on 4 April 2012. The Attachment hereto shows the dates on which the present 154 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [es

  8. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.71) is Rwanda, which deposited its instrument of acceptance of the Statute on 4 September 2012. The Attachment hereto shows the dates on which the present 155 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [es

  9. The Members of the Agency

    International Nuclear Information System (INIS)

    2014-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.76) is Brunei Darussalam, which deposited its instrument of acceptance of the Statute on 18 February 2014. The Attachment hereto shows the dates on which the present 162 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [es

  10. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.72) are Fiji and Togo, which deposited their instruments of acceptance of the Statute on 2 November 2012 and 1 November 2012, respectively. The Attachment hereto shows the dates on which the present 157 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  11. The Members of the Agency

    International Nuclear Information System (INIS)

    2014-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.76) is Brunei Darussalam, which deposited its instrument of acceptance of the Statute on 18 February 2014. The Attachment hereto shows the dates on which the present 162 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  12. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.73) is Trinidad and Tobago, which deposited its instrument of acceptance of the Statute on 9 November 2012. The Attachment hereto shows the dates on which the present 158 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  13. The Members of the Agency

    International Nuclear Information System (INIS)

    2011-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.68) is the Lao People's Democratic Republic which deposited its instrument of acceptance of the Statute on 4 November 2011. The Attachment hereto shows the dates on which the present 152 Member States deposited instruments of ratification or acceptance of the Statue with the depositary Government

  14. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.71) is Rwanda, which deposited its instrument of acceptance of the Statute on 4 September 2012. The Attachment hereto shows the dates on which the present 155 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [ru

  15. Reliability Modeling of Double Beam Bridge Crane

    Science.gov (United States)

    Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li

    2018-05-01

    This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.

  16. The stories of two bridges in Ghana

    DEFF Research Database (Denmark)

    Andreasen, Jørgen

    2004-01-01

    Public participation in bridge building was promoted by un habitat in the village of Mankrong. The neighbouring village did not participate in the construction of their bridge. The first flooding washed the second bridge down while the "participative bridge" stood up....

  17. Human Errors and Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Nowak, A. S.

    on basis of reliability profiles for bridges without human errors are extended to include bridges with human errors. The first rehabilitation distributions for bridges without and with human errors are combined into a joint first rehabilitation distribution. The methodology presented is illustrated...... for reinforced concrete bridges....

  18. Effects of Electrolyte on Floating Water Bridge

    Directory of Open Access Journals (Sweden)

    Hideo Nishiumi

    2009-01-01

    spontaneously. In this paper, we examined flow direction of water bridge and what effects the addition of electrolytes such as NaCl, NaOH, and NH4Cl to the floating water bridge would give. We found that ionization degree reduced the length of water bridge though insoluble electrolyte Al2O3 had no effect on the length of water bridge.

  19. Longer Lasting Bridge Deck Overlays

    Science.gov (United States)

    2018-04-01

    The objective of this report is to determine the most effective method for bridge deck overlay construction and repair by assessing current practices; examining new products and technologies; and reviewing NCHRP (National Cooperative Highway Research...

  20. Energy harvesting on highway bridges.

    Science.gov (United States)

    2011-01-01

    A concept for harvesting energy from the traffic-induced loadings on a highway bridge using piezoelectric : materials to generate electricity was explored through the prototype stage. A total of sixteen lead-zirconate : titanate (PZT) Type 5A piezoel...

  1. Research notes : listening to bridges.

    Science.gov (United States)

    2008-09-01

    The Federal Highway Administration requires owners of structurally deficient bridges to repair, replace, restrict truck loads, or conduct analysis and testing to maintain a safe highway system. Past experiments on reinforced concrete beams showed aco...

  2. Linear Cracking in Bridge Decks

    Science.gov (United States)

    2018-03-01

    Concrete cracking in bridge decks remains an important issue relative to deck durability. Cracks can allow increased penetration of chlorides, which can result in premature corrosion of the reinforcing steel and subsequent spalling of the concrete de...

  3. Performance indicators for roadway bridges

    OpenAIRE

    Strauss, A.; Vidovic, A.; Zambon, I.; Dengg, F.; Tanasic, N.; Matos, José C.

    2016-01-01

    Publicado em "Maintenance, monitoring, safety, risk and resilience of bridges and bridge networks". ISBN 978-1-138-02851-7 The performance indicators should, by its definition, allow capturing the life-cycle degradation processes affecting maintenance plans or the remaining lifetime. The qualitative or quantitative performance indicators are obtained through visual inspections, non-destructive tests or monitoring systems. After their quantification and the comparison with the resp...

  4. Bridging the Gap (BRIEFING CHARTS)

    Science.gov (United States)

    2007-03-05

    1 Defense Advanced Research Projects Agency “Bridging the Gap ” Dr. Robert F. Leheny Deputy Director Report Documentation Page Form ApprovedOMB No...comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to...4. TITLE AND SUBTITLE Bridging the Gap 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER

  5. Evaluation of Dynamic Load Factors for a High-Speed Railway Truss Arch Bridge

    Directory of Open Access Journals (Sweden)

    Ding Youliang

    2016-01-01

    Full Text Available Studies on dynamic impact of high-speed trains on long-span bridges are important for the design and evaluation of high-speed railway bridges. The use of the dynamic load factor (DLF to account for the impact effect has been widely accepted in bridge engineering. Although the field monitoring studies are the most dependable way to study the actual DLF of the bridge, according to previous studies there are few field monitoring data on high-speed railway truss arch bridges. This paper presents an evaluation of DLF based on field monitoring and finite element simulation of Nanjing DaShengGuan Bridge, which is a high-speed railway truss arch bridge with the longest span throughout the world. The DLFs in different members of steel truss arch are measured using monitoring data and simulated using finite element model, respectively. The effects of lane position, number of train carriages, and speed of trains on DLF are further investigated. By using the accumulative probability function of the Generalized Extreme Value Distribution, the probability distribution model of DLF is proposed, based on which the standard value of DLF within 50-year return period is evaluated and compared with different bridge design codes.

  6. Impact of Plastic Hinge Properties on Capacity Curve of Reinforced Concrete Bridges

    Directory of Open Access Journals (Sweden)

    Nasim Shatarat

    2017-01-01

    Full Text Available Pushover analysis is becoming recently the most practical tool for nonlinear analysis of regular and irregular highway bridges. The nonlinear behaviour of structural elements in this type of analysis can be modeled through automated-hinge or user-defined hinge models. The nonlinear properties of the user-defined hinge model for existing highway bridges can be determined in accordance with the recommendations of the Seismic Retrofit Manual by the Federal Highway Administration (FHWA-SRM. Finite element software such as the software SAP2000 offers a simpler and easier approach to determine the nonlinear hinge properties through the automated-hinge model which are determined automatically from the member material and cross section properties. However, the uncertainties in using the automated-hinge model in place of user-defined hinge model have never been addressed, especially for existing and widened bridges. In response to this need, pushover analysis was carried out for four old highway bridges, of which two were widened using the same superstructure but with more attention to seismic detailing requirements. The results of the analyses showed noticeable differences in the capacity curves obtained utilizing the user-defined and automated-hinge models. The study recommends that bridge design manuals clearly ask bridge designers to evaluate the deformation capacities of existing bridges and widened bridges using user-defined hinge model that is determined in accordance with the provisions of the FHWA-SRM.

  7. SURGERY OF SYMPTOMATIC MYOCARDIAL BRIDGING

    Directory of Open Access Journals (Sweden)

    N. Maghamipour N. Safaei

    2007-06-01

    Full Text Available Myocardial bridging with systolic compression of the left anterior descending coronary artery (LAD may be associated with myocardial ischemia. In symptomatic myocardial bridging unresponsive to medical treatment, surgical unroofing of the left LAD can be performed. Little information is available about the long-term prognosis of patients with this coronary anomaly after the surgical unroofing, so we decided to evaluate the result of this operation. A total of 26 patients underwent surgical unroofing of myocardial bridging. Patients had a myocardial bridge of at least 3 cm in length in the middle of LAD and with more than 70% compression during systole. Unroofing was performed with cardiopulmonary bypass in 16 and with off pump technique in 10 patients. In 6 patients repeat angiographies for control of myotomy were done. In one of them a nonsignificant 20% narrowing was seen. Postoperative scintigraphic and angiographic studies demonstrated restoration of coronary flow and myocardial perfusion without residual myocardial bridges under beta-stimulation in 24 patients. Two patients had residual narrowing. With off pump technique, 1 patient had perforation of the right ventricle and 1 patient underwent reoperation because of incomplete unroofing during the first operation. None of the patients with cardiopulmonary bypass technique had residual chest pain or other complications. Surgical unroofing of myocardial bridging with the aid of cardiopulmonary bypass is a safe and easy procedure with low operative risk and with excellent functional results.

  8. Development of Inspection Robots for Bridge Cables

    Directory of Open Access Journals (Sweden)

    Hae-Bum Yun

    2013-01-01

    Full Text Available This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  9. Development of inspection robots for bridge cables.

    Science.gov (United States)

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  10. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction

    Science.gov (United States)

    2017-09-01

    Concrete bridge decks are directly exposed to daily traffic loads and may experience some surface cracking caused by excessive stress or fatigue accumulation, which requires repair or replacement. Among typical bridges in North America, bridge decks ...

  11. 33 CFR 118.100 - Retroreflective panels on bridge piers.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Retroreflective panels on bridge... SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.100 Retroreflective panels on bridge piers. The... 12 inches square. (c) To mark bridge piers or channel sides on bridges not required to have bridge...

  12. The Akashi Kaikyo Bridge and the Storebælt Bridge

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1999-01-01

    With the completion of the Akashi Kaikyo Bridge and the Storebælt East Bridge the development of the suspension bridge technology in the 20th century has manifested itself in two impressive structures. With the present echnology may bridges of similar (and also more modest) dimensions...... will undoubtedly be built far into the next century. For bridges going beyond the spans of existing bridges it is, however, likely that new concepts will be developed....

  13. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  14. Guardrails for Use on Historic Bridges: Volume 2—Bridge Deck Overhang Design

    OpenAIRE

    Frosch, Robert J.; Morel, Adam J.

    2016-01-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridges can be subject to protection because of the role they play in aesthetics. Unfortunately, original railings on historic bridges do not typically meet current crash-test requirements and typically do not meet current standards for railing height and...

  15. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.72) are Fiji and Togo, which deposited their instruments of acceptance of the Statute on 2 November 2012 and 1 November 2012, respectively. The Attachment hereto shows the dates on which the present 157 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [ru

  16. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.72) are Fiji and Togo, which deposited their instruments of acceptance of the Statute on 2 November 2012 and 1 November 2012, respectively. The Attachment hereto shows the dates on which the present 157 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [fr

  17. The Members of the Agency

    International Nuclear Information System (INIS)

    1999-01-01

    The document lists the 129 Member States of the Agency as of 1 June 1999. The new Member since the last issue of the list (INFCIRC/2/51) is Benin. The dates on which the present 129 states became Members, and the state (Honduras) whose application for membership of the Agency has been recommended by the Board of Governors to be considered at the 43rd session of the General Conference are given in an Attachment

  18. The Members of the Agency

    International Nuclear Information System (INIS)

    2012-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.72) are Fiji and Togo, which deposited their instruments of acceptance of the Statute on 2 November 2012 and 1 November 2012, respectively. The Attachment hereto shows the dates on which the present 157 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [es

  19. The Members of the Agency

    International Nuclear Information System (INIS)

    1995-01-01

    The new member since the last list of Member States of the Agency was issued (INFCIRC/2/Rev.44) is Yemen. The Attachment hereto shows the dates on which the 122 States became members of the Agency, as well as the State whose application for membership of the Agency was approved by the General Conference, but which has not yet deposited an instrument of acceptance of the Statute

  20. The Members of the Agency

    International Nuclear Information System (INIS)

    2014-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.75) are San Marino and the Bahamas, which deposited their instruments of acceptance of the Statute on 25 November 2013 and 7 January 2014, respectively. The Attachment hereto shows the dates on which the present 161 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [es

  1. The members of the Agency

    International Nuclear Information System (INIS)

    1994-01-01

    The new members since the last list of Member States of the Agency was issued (INFCIRC/2/Rev.42) are: Armenia, Coratia, the Czech Republic, Lithuania, the Marshall Islands, the Slovak Republic and Uzbekistan. The Attachment to the circular shows the dates on which the 120 States became members of the Agency, as well as those States whose application for membership of the Agency was approved by the General Conference, but who have not yet deposited an instrument of acceptance of the Statute

  2. The Members of the Agency

    International Nuclear Information System (INIS)

    1998-01-01

    The document lists the 128 Member States of the Agency as of 18 September 1998. The new Member since the last issue of the list (INFCIRC/2/50) is Burkina Faso. In an attachment the dates on which the present 128 states became Members, and the state (Benin) whose application for membership of the Agency has been recommended by the Board of Governors to be considered at the 42nd session of the General Conference are given

  3. The Members of the Agency

    International Nuclear Information System (INIS)

    2014-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.75) are San Marino and the Bahamas, which deposited their instruments of acceptance of the Statute on 25 November 2013 and 7 January 2014, respectively. The Attachment hereto shows the dates on which the present 161 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  4. The Members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-13

    The new member since the last list of Member States of the Agency was issued (INFCIRC/2/Rev.44) is Yemen. The Attachment hereto shows the dates on which the 122 States became members of the Agency, as well as the State whose application for membership of the Agency was approved by the General Conference, but which has not yet deposited an instrument of acceptance of the Statute.

  5. The members of the Agency

    International Nuclear Information System (INIS)

    1998-01-01

    The document lists the 127 Member States of the Agency as of 1 January 1998. The new Members since the last issue of of the list (INFCIRC/2/49) are Malta and the Republic of Moldova. In an attachment are given the dates on which the present 127 states become Members, the state (Burkina Faso) whose application for membership of the Agency has been approved by the General Conference but which has not deposited an instrument of acceptance of the Statute

  6. The members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-15

    The document lists the 127 Member States of the Agency as of 1 January 1998. The new Members since the last issue of of the list (INFCIRC/2/49) are Malta and the Republic of Moldova. In an attachment are given the dates on which the present 127 states become Members, the state (Burkina Faso) whose application for membership of the Agency has been approved by the General Conference but which has not deposited an instrument of acceptance of the Statute.

  7. The Members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-18

    The document lists the 128 Member States of the Agency as of 18 September 1998. The new Member since the last issue of the list (INFCIRC/2/50) is Burkina Faso. In an attachment the dates on which the present 128 states became Members, and the state (Benin) whose application for membership of the Agency has been recommended by the Board of Governors to be considered at the 42nd session of the General Conference are given

  8. The Members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-16

    The document lists the 129 Member States of the Agency as of 1 June 1999. The new Member since the last issue of the list (INFCIRC/2/51) is Benin. The dates on which the present 129 states became Members, and the state (Honduras) whose application for membership of the Agency has been recommended by the Board of Governors to be considered at the 43rd session of the General Conference are given in an Attachment.

  9. The Members of the Agency

    International Nuclear Information System (INIS)

    2014-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.75) are San Marino and the Bahamas, which deposited their instruments of acceptance of the Statute on 25 November 2013 and 7 January 2014, respectively. The Attachment hereto shows the dates on which the present 161 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government [fr

  10. Fiber optic corrosion sensing for bridges and roadway surfaces

    Science.gov (United States)

    Fuhr, Peter L.; Ambrose, Timothy P.; Huston, Dryver R.; McPadden, Adam P.

    1995-04-01

    In this paper we report the development of a fiber optic corrosion sensing system that complements and/or surpasses the capabilities of conventional corrosion sensing techniques. The sensing system is based on evanescent wave phenomena and in the configured sensor allows for the detection of general corrosion on and within materials. Based on the authors' experience installing may kilometers of fiberoptic sensors into large civil structures such as multistory buildings, hydroelectric dams, and railway/roadway bridges, we are (currently) embedding these sensors into bridge test members -- limited structures that are being subjected to accelerated corrosion testing conditions. Three Vermont Agency of Transportation bridges, one in a low salt use region, one in a medium salt use region, and the third in a high salt use region, are being selected and will be instrumented with these embedded fiber optic corrosion sensors. Monitoring of chloride penetration and rebar corrosion status will be measured during the course of a longitudinal study. The specific sensing mechanism and design for robustness (to allow survival of the embedding process during repaving of the bridges) are discussed and laboratory and initial field results are presented.

  11. The Members of the Agency

    International Nuclear Information System (INIS)

    2001-01-01

    The new Members since the last list of Member States was issued (INFCIRC/2/Rev.54) are the Republic of Tajikistan, which deposited the instrument of acceptance of the Statute on 10 September 2001 and the Federal Republic of Yugoslavia, which deposited the instrument of acceptance of the Statute on 31 October 2001. The Attachment hereto shows the dates on which the present 133 Member States became Members. It also shows the States whose applications for membership of the Agency have been approved by the General Conference, but which have not yet deposited an instrument of acceptance of the Statute

  12. The members of the Agency

    International Nuclear Information System (INIS)

    1996-01-01

    The document lists the 124 Member States of the Agency as of 1 September 1996. The new Member since the last issue of the list (INFCIRC/2/Rev.47) is Georgia. In an attachment are given the dates on which the 124 Member States became Members, the State (Latvia) whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute and the State (Republic of Moldova) whose application for membership has been recommended by the Board of Governors for approval by the General Conference

  13. The members of the Agency

    International Nuclear Information System (INIS)

    1996-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.46) is Bosnia and Herzegovina. The Attachment hereto shows the dates on which the present 123 Member States became Members. It also shows the States whose applications for membership of the Agency have been approved by the General Conference but which have not yet deposited an instrument of acceptance of the Statute and the State whose application for membership has been recommended by the Board of Governors for approval by the General Conference

  14. The Members of the Agency

    International Nuclear Information System (INIS)

    1995-01-01

    No new Member has joined the Agency since the last list of Member States was issued (INFCIRC/2/Rev.45). The Attachment hereto shows the dates on which the present 122 Member States became Members. It also shows the State whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute and the States whose applications for membership have been recommended by the Board of Governors for approval by the General Conference

  15. The Members of the Agency

    International Nuclear Information System (INIS)

    2003-01-01

    The document lists the 136 Member States of the Agency as of 6 May 2003. The new Members since the last issue of the list (INFCIRC/2/57) are Eritrea and the Republic of Seychelles. Cambodia withdrew from the Agency with effect from 26 March 2003. The dates on which the present 136 Member States became Members are given in an Attachment. It also shows the States whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute

  16. The members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-10

    The document lists the 124 Member States of the Agency as of 1 September 1996. The new Member since the last issue of the list (INFCIRC/2/Rev.47) is Georgia. In an attachment are given the dates on which the 124 Member States became Members, the State (Latvia) whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute and the State (Republic of Moldova) whose application for membership has been recommended by the Board of Governors for approval by the General Conference.

  17. The Members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-11

    No new Member has joined the Agency since the last list of Member States was issued (INFCIRC/2/Rev.45). The Attachment hereto shows the dates on which the present 122 Member States became Members. It also shows the State whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute and the States whose applications for membership have been recommended by the Board of Governors for approval by the General Conference.

  18. The members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-26

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.46) is Bosnia and Herzegovina. The Attachment hereto shows the dates on which the present 123 Member States became Members. It also shows the States whose applications for membership of the Agency have been approved by the General Conference but which have not yet deposited an instrument of acceptance of the Statute and the State whose application for membership has been recommended by the Board of Governors for approval by the General Conference.

  19. Estimation of Structure-Borne Noise Reduction Effect of Steel Railway Bridge Equipped with Floating Ladder Track and Floating Reinforced-Concrete Deck

    Science.gov (United States)

    Watanabe, Tsutomu; Sogabe, Masamichi; Asanuma, Kiyoshi; Wakui, Hajime

    A number of steel railway bridges have been constructed in Japan. Thin steel members used for the bridges easily tend to vibrate and generate structure-borne noise. Accordingly, the number of constructions of steel railway bridges tends to decrease in the urban areas from a viewpoint of environmental preservation. Then, as a countermeasure against structure-borne noise generated from steel railway bridges, we have developed a new type of the steel railway bridge equipped with a floating-ladder track and a floating reinforced-concrete (RC) deck. As a result of train-running experiment, it became apparent that the new steel railway bridge installed by double floating system has reduced a vibration velocity level by 10.5 dB(A) at main girder web as compared with a steel railway bridge installed by directly fastened track. This reduction effect was achieved by the ladder track and RC deck supported by resilient materials.

  20. Floating liquid bridge charge dynamics

    Science.gov (United States)

    Teschke, Omar; Soares, David Mendez; Gomes, Whyllerson Evaristo; Valente Filho, Juracyr Ferraz

    2016-01-01

    The interaction of liquid with electric fields is investigated in a configuration where up to 13 kV are applied between electrodes resulting in a 106 V/m electric field in the capillaries and where there is the formation of a free-standing fluid bridge in the interelectrode gap. The Mott-Gurney equation was fitted to the measured ionization current vs applied voltage curve which indicates that the ionization rate at the high-voltage anode electrode dimethylsulfoxide (DMSO) interface and space charging in the interelectrode gap determine the floating liquid bridge current for a given cathode-to-anode voltage. Space charge effects were measured in the cathode becker and also at the liquid bridge since the ionized charges at the anode migrate to the bridge outer surface and decrease the interfacial tension from 43 mJ/m2 to 29 mJ/m2. Two distinct structural regions then form the bridge, a charged plastic (bulk modulus ˜100 MPa) conducting outer layer with a surface conductivity of ˜10-9 Ω-1, which shapes and supports the floating fluid structure, and an inner liquid cylinder, where DMSO molecules flow.

  1. Noise Considerations in Resistance Bridges

    DEFF Research Database (Denmark)

    Diamond, Joseph M.

    1963-01-01

    A signal-to-noise analysis is made of the Wheatstone bridge, where the unknown and standard resistors may be at different temperatures, a situation which occurs in resistance thermometry. The limiting condition is assumed to be dissipation in the unknown resistor. It is shown that the ratio arms...... thermometry, where the noise in the unknown resistor will predominate strongly. An impedance step-up device (transformer or tuned circuit) is valuable in raising the bridge signal and noise level above the noise of the first amplifier tube. However, as the step-up ratio is increased, two counterfactors appear....... With certain assumptions about the noise and grid current of the first tube it is found that the equivalent temperature of a unity ratio (Mueller) bridge used for liquid helium measurements may be 400°K....

  2. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1969-01-01

    In this document the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials delivered by Members up to 30 June 1969 in compliance with requests the Agency had made under Article IX. D

  3. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1975-01-01

    In this document the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials which Members had delivered up to 30 June 1975, in compliance with requests the Agency had made under Article IX. D

  4. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1974-01-01

    In this document the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials which Members had delivered up to 31 March 1974, in compliance with requests the Agency had made under Article IX. D

  5. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1971-01-01

    In this document the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials which Members had delivered up to the end of 1970, in compliance with requests the Agency had made under Article IX. D

  6. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1973-01-01

    In this document the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials which Members had delivered up to the end of 1972, in compliance with requests the Agency had made under Article IX. D

  7. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1972-01-01

    In this document the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials which Members had delivered up to the end of 1971, in compliance with requests the Agency had made under Article IX. D

  8. Working with Difficult Group Members.

    Science.gov (United States)

    Kottler, Jeffrey A.

    1994-01-01

    Describes types of group members who are challenging in group settings including entitled, manipulative, and character-disordered clients. Provides suggestions for working with these group members, either as isolated cases or as homogenous populations, emphasizing the protection of other clients' rights. Includes 31 references. (Author/CRR)

  9. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    Science.gov (United States)

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  10. The Wien Bridge Oscillator Family

    DEFF Research Database (Denmark)

    Lindberg, Erik

    2006-01-01

    A tutorial in which the Wien bridge family of oscillators is defined and investigated. Oscillators which do not fit into the Barkhausen criterion topology may be designed. A design procedure based on initial complex pole quality factor is reported. The dynamic transfer characteristic of the ampli......A tutorial in which the Wien bridge family of oscillators is defined and investigated. Oscillators which do not fit into the Barkhausen criterion topology may be designed. A design procedure based on initial complex pole quality factor is reported. The dynamic transfer characteristic...

  11. Bridging the Vector Calculus Gap

    Science.gov (United States)

    Dray, Tevian; Manogue, Corinne

    2003-05-01

    As with Britain and America, mathematicians and physicists are separated from each other by a common language. In a nutshell, mathematics is about functions, but physics is about things. For the last several years, we have led an NSF-supported effort to "bridge the vector calculus gap" between mathematics and physics. The unifying theme we have discovered is to emphasize geometric reasoning, not (just) algebraic computation. In this talk, we will illustrate the language differences between mathematicians and physicists, and how we are trying reconcile them in the classroom. For further information about the project go to: http://www.physics.orst.edu/bridge

  12. 1,2-bridged quadricyclanes

    International Nuclear Information System (INIS)

    Hart, H.; Cheng-Tai Peng

    1982-01-01

    The readily available benzodihydropentalene 6 and dimethyl acetylenedicarboxylate react to give norbornadiene diester 8, with a three-carbon bridge from C 1 to C 2 . Irradiation of 8 gives the corresponding C 1 -C 2 bridged quadricyclane diester 9, a new ring system. Diester 9 is quite stable, reverting to 8 with a tsub(1/2) of 30 min at 170 0 C. The corresponding diacid 11, also prepared, reverts to its norbornadiene precursor at a considerably lower temperature, possibly as a consequence of acid catalysis. (author)

  13. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    Science.gov (United States)

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  14. An Expert System for Concrete Bridge Management

    DEFF Research Database (Denmark)

    Brito, J. de; Branco, F. A.; Thoft-Christensen, Palle

    1997-01-01

    The importance of bridge repair versus new bridge construction has risen in recent decades due to high deterioration rates that have been observed in these structures. Budgets both for building new bridges and keeping the existing ones are always limited. To help rational decision-making, bridge...... management systems are presently being implemented by bridge authorities in several countries. The prototype of an expert system for concrete bridge management is presented in this paper, with its functionality relying on two modules. The inspection module relies on a periodic acquisition of field...... information complemented by a knowledge-based interactive system, BRIDGE-1. To optimize management strategies at the headquarters, the BRIDGE-2 module was implemented, including three submodules: inspection strategy, maintenance and repair....

  15. Characterization of bridge foundations workshop report.

    Science.gov (United States)

    2013-11-01

    "In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge foundations. To narrow the focus and develop a research roadmap for the program, a workshop on Characterization of Bridge Foundations...

  16. IceBridge Mission Flight Reports

    Data.gov (United States)

    National Aeronautics and Space Administration — The IceBridge Mission Flight Reports data set contains flight reports from NASA Operation IceBridge Greenland, Arctic, Antarctic, and Alaska missions. Flight reports...

  17. Risk Mitigation for Highway and Railway Bridges

    Science.gov (United States)

    2009-02-01

    Performance of the transportation network strongly depends on the performance of bridges. Bridges constitute a vital part of the transportation infrastructure system and they are vulnerable to extreme events such as natural disasters (i.e., hurricane...

  18. Fiber reinforced polymer bridge decks : [technical summary].

    Science.gov (United States)

    2011-01-01

    A number of researchers have addressed the use of Fiber Reinforced Polymer (FRP) deck as a replacement solution for deteriorated bridge decks made of traditional materials. The use of new, advanced materials such as FRP is advantageous when the bridg...

  19. Final Environmental Assessment, Horse Creek Bridge Replacement

    Science.gov (United States)

    2010-10-01

    existing bridge pipes that have failed and replace the failed structure with a new, prefabricated pedestrian bridge within the original bridge footprint...vehicles, nor designed for support of standard passenger vehicle loads. The bridge would be a single prefabricated unit consisting of a steel grate...placed on new concrete abutments built on the existing foundations on the creek banks, and put in place by a crane operating from the vehicle parking

  20. The Members of the Agency

    International Nuclear Information System (INIS)

    1997-01-01

    The document lists the 125 Member States of the Agency as of 1 September 1997. The new Member since the last issue of the list (INFCIRC/2/Rev.48) is Latvia. In an Attachment are given the dates on which the present 125 States became Members, the State (Republic of Moldova) whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute and the States (Malta and Burkina Faso) whose applications for membership have been recommended by the Board of Governors for approval by the General Conference

  1. The Members of the Agency

    International Nuclear Information System (INIS)

    1994-01-01

    The new members since the last list of Member States of the Agency was issued (INFCIRC/2/Rev.43) are: Kazakhstan and the former Yugoslav Republic of Macedonia. The Democratic People's Republic of Korea withdrew from membership of the Agency as of 13 June 1994. The Attachment hereto shows the dates on which the 121 States became members of the Agency, as well as those States whose application for membership of the Agency was approved by the General Conference, but who have not yet deposited an instrument of acceptance of the Statute

  2. The Members of the Agency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-22

    The document lists the 125 Member States of the Agency as of 1 September 1997. The new Member since the last issue of the list (INFCIRC/2/Rev.48) is Latvia. In an Attachment are given the dates on which the present 125 States became Members, the State (Republic of Moldova) whose application for membership of the Agency has been approved by the General Conference but which has not yet deposited an instrument of acceptance of the Statute and the States (Malta and Burkina Faso) whose applications for membership have been recommended by the Board of Governors for approval by the General Conference.

  3. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Science.gov (United States)

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  4. Bridge Programs in Illinois: Results of the 2010 Illinois Bridge Status Survey

    Science.gov (United States)

    Taylor, J. L.; Harmon, T.

    2010-01-01

    This report provides a summary of major results of the Illinois Bridge Status Survey, administered online between April and June 2010. The purpose of the survey was to understand the extent to which bridge programs are being implemented in Illinois, as well as to build an online directory of bridge programs. Bridge programs are an emerging…

  5. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Science.gov (United States)

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  6. Optimizing Tailored Bus Bridging Paths

    NARCIS (Netherlands)

    Gu, Wei; Yu, Jie; Ji, Yuxiong; van der Gun, J.P.T.; Pel, A.J.; Zhang, H. Michael; van Arem, B.

    2017-01-01

    Metro disruptions due to unexpected events reduce transit system reliability, resulting in significant productivity loss and long passenger delays. Bus bridging strategy is often used to connect stations affected by metro disruptions such that passengers could continue their journey. The literature

  7. Bridge 47--Building Global Citizenship

    Science.gov (United States)

    Lappalainen, Rilli

    2018-01-01

    Preparing young people to solve the world's greatest challenges is necessary to achieve the Sustainable Development Goals, as recognized in Target 4.7 for global citizenship. The Bridge 47 Network brings together different perspectives and approaches in values-based education to provide a forum to examine the skills and competencies needed to be…

  8. Artropathies that produce osseous bridges

    International Nuclear Information System (INIS)

    Restrepo Suarez, Jose Felix; Iglesias Gamarra, Antonio; Calvo Paramo, Enrique

    2001-01-01

    In this paper, it is reviewed the most common artropathies that are presented with osseous bridging, with emphasis in the radiological finding of the spine. Also, it's showed other different radiological finding that can help in the differential diagnosis of this disease, such us the sacroilitis in the ankylosing spondylitis or the osteolysis in the psoriatic arthritis

  9. Exodermic bridge deck performance evaluation.

    Science.gov (United States)

    2010-07-01

    In 1998, the Wisconsin DOT completed a two"leaf bascule bridge in Green Bay with an exodermic deck system. The exodermic deck consisted of 4.5"in thick cast"in"place reinforced concrete supported by a 5.19"in tall unfilled steel grid. The concrete an...

  10. Evaluation of Summer Bridge Programs

    Science.gov (United States)

    Garcia, Lisa D.; Paz, Chiara C.

    2009-01-01

    Many colleges and universities in the United States offer summer programs for their incoming students. While programs are structured and administered in a variety of ways and target various student populations, the most common type of summer bridge program aims to serve historically underrepresented students and students of low socioeconomic…

  11. Intercellular bridges in vertebrate gastrulation.

    Directory of Open Access Journals (Sweden)

    Luca Caneparo

    Full Text Available The developing zebrafish embryo has been the subject of many studies of regional patterning, stereotypical cell movements and changes in cell shape. To better study the morphological features of cells during gastrulation, we generated mosaic embryos expressing membrane attached Dendra2 to highlight cellular boundaries. We find that intercellular bridges join a significant fraction of epiblast cells in the zebrafish embryo, reaching several cell diameters in length and spanning across different regions of the developing embryos. These intercellular bridges are distinct from the cellular protrusions previously reported as extending from hypoblast cells (1-2 cellular diameters in length or epiblast cells (which were shorter. Most of the intercellular bridges were formed at pre-gastrula stages by the daughters of a dividing cell maintaining a membrane tether as they move apart after mitosis. These intercellular bridges persist during gastrulation and can mediate the transfer of proteins between distant cells. These findings reveal a surprising feature of the cellular landscape in zebrafish embryos and open new possibilities for cell-cell communication during gastrulation, with implications for modeling, cellular mechanics, and morphogenetic signaling.

  12. Detection of Ultrafine Anaphase Bridges

    DEFF Research Database (Denmark)

    Bizard, Anna H; Nielsen, Christian F; Hickson, Ian D

    2018-01-01

    Ultrafine anaphase bridges (UFBs) are thin DNA threads linking the separating sister chromatids in the anaphase of mitosis. UFBs are thought to form when topological DNA entanglements between two chromatids are not resolved prior to anaphase onset. In contrast to other markers of defective...

  13. Accelerated bridge paint test program.

    Science.gov (United States)

    2011-07-06

    The accelerated bridge paint (AB-Paint) program evaluated a new Sherwin-Williams two-coat, : fast-curing paint system. The system is comprised of an organic zinc-rich primer (SW Corothane I : Galvapac One-Pack Zinc-Rich Primer B65 G11) and a polyurea...

  14. Nonlinear models of suspension bridges

    Czech Academy of Sciences Publication Activity Database

    Malík, Josef

    2006-01-01

    Roč. 321, č. 2 (2006), s. 828-850 ISSN 0022-247X Institutional research plan: CEZ:AV0Z30860518 Keywords : suspension bridges * principle of minimum energy Subject RIV: BA - General Mathematics Impact factor: 0.758, year: 2006

  15. Lifetime Reliability Assessment of Concrete Slab Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    A procedure for lifetime assesment of the reliability of short concrete slab bridges is presented in the paper. Corrosion of the reinforcement is the deterioration mechanism used for estimating the reliability profiles for such bridges. The importance of using sensitivity measures is stressed....... Finally the produce is illustrated on 6 existing UK bridges....

  16. BRIDGES for Young Adolescents in North Dakota.

    Science.gov (United States)

    Harris, Mary McDonnell

    The BRIDGES Project was initiated to explore ways for North Dakota to provide young people with stronger bridges from childhood to adulthood. This report summarizes recommendations of the 1990-91 Governor's Task Force on Early Adolescence. The recommendations concern practical actions for the building of bridges by the following groups: (1)…

  17. Building Bridges One Line at a Time

    Science.gov (United States)

    Grigsby, Cathy Murray

    2012-01-01

    In this article, first-grade students were taught the different kinds of lines that were part of the construction of various bridges--the curved lines of the arches of stone bridges, straight lines connecting the cables of a suspension bridge, vertical lines, horizontal lines, and so on. They gained practice in drawing structures and in fine brush…

  18. Stabilizer for seismically exposed bridge cranes

    International Nuclear Information System (INIS)

    Engelke, M.; Kuhr, H.

    1982-01-01

    The invention concerns a stabilizer for seismically exposed bridge cranes in reactor buildings. The trolley and the crane bridge are fitted with the stabilizer consisting of a bipartite safety catch which is connected with a joint and able to take up the vertical loads during an earthquake. This stabilizer is suitable for all kinds of bridge cranes operated in seismically active regions

  19. Dynamic behaviour of prestressed concrete bridges

    International Nuclear Information System (INIS)

    Javor, T.

    1982-01-01

    The paper presents the results of experimental research of dynamic effects on prestressed concrete bridges in dynamic load tests using testing vehicles. The bridges were passed over in both directions at various speeds also running over an artificial unevenness to produce impact loads. From investigated bridges are shown the dynamic quantities such as dynamic coefficients, natural frequency, logarithmical decrement of damping, etc. (orig.) [de

  20. Hydrodynamic forces on inundated bridge decks

    Science.gov (United States)

    2009-05-01

    The hydrodynamic forces experienced by an inundated bridge deck have great importance in the design of bridges. Specifically, the drag force, lift force, and the moment acting on the bridge deck under various levels of inundation and a range of flow ...

  1. Remediation: Higher Education's Bridge to Nowhere

    Science.gov (United States)

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  2. Spread prestressed concrete slab beam bridges.

    Science.gov (United States)

    2015-04-01

    TxDOT uses prestressed slab beam bridges for short-span bridges ranging from approximately 3050 ft in : length. These bridges have precast, pretensioned slab beams placed immediately adjacent to one another : with a cast-in-place slab made composi...

  3. Thermomechanical responses of concrete members strengthened with cfrp sheets

    Science.gov (United States)

    Alqurashi, Abdulaziz

    Strengthening structural members means to be able to carry additional loads. Since, 1990s, a lot of materials and techniques have been established to not only increasing the capacity of member but also facing deterioration. Deterioration has become one of the worst highly maintenance cost. According to The ASCE, 27.1% of all bridges in the United States are not effectual. This is because the high traffic reflects negatively to structural members and cause deterioration of these members. This problem has been cost a lot of money. In addition, FRP has approved that it can increase the capacity of member and overcome some disadvantages such as deterioration. Therefore, CFRP sheet has become widely used. However, high temperatures affect the performance of externally bonded CFRP sheet negatively. Investigation should be carried out on relaxation and flexural performance of members under different temperatures. Therefore, this thesis focus on analyzing and investigating the performance of strengthened members exposed to elevated temperatures (25 to 175 °C). The experimental program was divided to two main parts. First, 144 strengthen concrete blocks 100mm X 150mm X 75mm has been exposed to elevated temperatures. These blocks have two main categories, which are different CFRP sheet width, and different CFRP sheet length. Different CFRP width has three types, which are type 0.25B (25mm x 100mm), type 0.5B (50mm x 100mm) and type 0.75B (75mm x 100mm). Also, Different CFRP length has three types, which are type L e (bonded area of 50 mm by 90mm), 1.25 Le (area of 50mm by 125mm) and type 1.5Le (50mm by 137 mm). Second, studying the performance of RC beams exposed to elevated temperatures.

  4. 33 CFR 115.70 - Advance approval of bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  5. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  6. Thermal effects in concrete members

    International Nuclear Information System (INIS)

    Kar, A.K.

    1977-01-01

    The proposed method of analysis for concrete members subjected to temperature changes is consistent with the requirements of ultimate strength design. This also facilitates the provision of the same safety margin as for other loads. Due to cracks and creep in concrete, thermal stresses are nonlinear; they are dependent on the effective member stiffness, which in turn vary with the magnitude of loading. Therefore it is inconsistent to have an ultimate strength design in conjunction with an analysis based on the linear elastic theory. It is proposed that when the requirements of serviceability are met, the neutral axis corresponding to the ultimate load capacity conditions be considered for temperature-induced loadings. This conforms with the fact that the thermal load, because of creep and formation of cracks in the member, can be self-relieving as the failure load condition or ultimate capacity is approached. The maximum thermal load that can develop in dependent on the effective cross section of the member. Recommendations are made for determining the average effective member stiffness, which lies between the stiffness corresponding to the cracked (at ultimate condition) and the uncracked sections. In the proposed method, thermal stresses are not considered completely self-relieving. The stresses are considered simultaneously with stresses resulting from other causes. A step-by-step approach is presented for analysis and design of concrete members subjected to temperature changes

  7. Cyclodextrin ketones as oxidation catalysts: investigation of bridged derivatives

    DEFF Research Database (Denmark)

    Fenger, Thomas Hauch; Marinescu, Lavinia; Bols, Mikael

    2009-01-01

    A series of alpha-cyclodextrin derivatives containing a 3, 4 or 5 membered ether-linked bridge between the 6A and 6D oxygen atoms, with and without a ketone, were prepared. The synthesis used perbenzylated alpha-cyclodextrin A,D-diol as a starting material upon which O-alkylation and further modi...... derivatives were also made. The 6A,6D-di-O-(propa-2-on-1,3-diyl)-6C,6F-di-O-methyl and di-O-pivaloyl derivatives were also prepared. The new compounds were analysed for catalysis of the oxidation of amines and alcohols....

  8. Effects of Electrolyte on Floating Water Bridge

    OpenAIRE

    Hideo Nishiumi; Fumitaka Honda

    2009-01-01

    Fuchs found phenomena that when high voltage is applied to deionized water filled in two contacted beakers, a floating water bridge forms spontaneously. In this paper, we examined flow direction of water bridge and what effects the addition of electrolytes such as NaCl, NaOH, and N H 4 C l to the floating water bridge would give. We found that ionization degree reduced the length of water bridge though insoluble electrolyte A l 2 O 3 had no effect on the length of water bridge.

  9. Crossing borders via mental bridges

    DEFF Research Database (Denmark)

    Keil, Dirk

    The project studies cross-border regional integration in Europe drawing on the example of the emerging Danish-German Femern Belt Region. It focuses on cross-border networking within public administration as part of regional integra- tion. My central question is how national-cultural differences...... influence coopera- tion, coordination and collaboration in administrative cross-border networks. In this connection the project asks after the perception of regional integration seen from the different national backgrounds. The research concentrates on the group of decision makers within the field of public...... administration, and in specific on the attempt to initiate and promote cross-border regional integration via the building of mental bridges between Danish and German parts of the Femern Belt Region. Here one of the first projects aiming primarily at building mental bridges in the Femern Belt Region...

  10. Severe ASR damaged concrete bridges

    DEFF Research Database (Denmark)

    Antonio Barbosa, Ricardo; Gustenhoff Hansen, Søren

    2015-01-01

    Technical University of Denmark (DTU) and University of Southern Denmark (SDU) have conducted several full-scale experiments with severe ASR deteriorated bridges. This paper presents few and preliminary results from both the shear tests and the measuring of the material properties. The shear test...... show that the shear capacity is almost unaffected of ASR despite significant reduction in compressive concrete strength. Furthermore, measurements show a significant tensile reinforcement strain developed due to ASR expansion....

  11. External corners as heat bridges

    Energy Technology Data Exchange (ETDEWEB)

    Berber, J.

    1984-08-01

    The maximum additional heat loss in vertical external corners depending on wall thickness is determined. In order to amire at a low k-value, a much smaller wall thickness is required in externally insulated walls than in monolithic constructions; the greater loss of heat bridge with external insulation stands in contrast to a higher loss in thick, monolithic walls. In relation to total losses, the additional losses through external corners are practically negligible.

  12. Inspection Strategies for Concrete Bridges

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Thoft-Christensen, Palle

    1989-01-01

    In this paper an optimal inspection strategy for concrete bridges based on periodic routine and detailed inspections is presented. The failure mode considered is corrosion of the reinforcement due to chlorides. A simple modelling of the corrosion and of the inspection strategy is presented....... The optimal inspection strategy is determined from an optimization problem, where the design variables are time intervals between detailed inspections and the concrete cover. The strategy is illustrated on a simple structure, namely a reinforced concrete beam....

  13. Cross-Quint-Bridge Resistor

    Science.gov (United States)

    Hannaman, David J.; Lieneweg, Udo; Buehler, Martin G.; Mantalas, Linda

    1991-01-01

    Integrated-circuit conductive test pattern intended to provide data on effects of design widths and design spacings upon actual widths of conductive lines. Provides for electrical measurements both on lines of unknown width and on features having known dimensions. Data from measurements on five bridges used to determine four parameters of mathematical model describing system. In principle, pattern determines effects of width and spacing and interaction between them.

  14. Burnout in Female Faculty Members.

    Science.gov (United States)

    Cassidy-Vu, Lisa; Beck, Keli; Moore, Justin B

    2017-04-01

    Despite approximately equal numbers of male and female medical school graduates, women are entering academic medicine at a lower rate than their male colleagues. Of those who do assume a faculty position, female faculty members report higher levels of burnout, often attributable to gender-specific difficulties in clinical expectations and maintenance of work-life balance. Many of these struggles are attributable to issues that are amenable to supportive policies, but these policies are inconsistent in their availability and practice. This commentary presents evidence for inconsistencies in the day-to-day experience of female faculty members, and proposes solutions for the mitigation of the challenges experienced more often by female faculty members with the goal of diversifying and strengthening academic medicine.

  15. NASA Operation IceBridge Flies Into the Classroom!

    Science.gov (United States)

    Kane, M.

    2017-12-01

    Field research opportunities for educators is leveraged as an invaluable tool to increase public engagement in climate research and the geosciences. We investigate the influence of educator's authentic fieldwork by highlighting the post-field impacts of a PolarTREC Teacher who participated in two campaigns, including NASA Operation IceBridge campaign over Antarctica in 2016. NASA's Operation IceBridge has hosted PolarTREC teachers since 2012, welcoming five teachers aboard multiple flights over the Arctic and one over Antarctica. The continuity of teacher inclusion in Operation IceBridge campaigns has facilitated a platform for collaborative curriculum development and revision, integration of National Snow and Ice Data Center (NSIDC) data into multiple classrooms, and given us a means whereby students can interact with science team members. I present impacts to my teaching and classrooms as I grapple with "Big Data" to allow students to work directly with lidar and radar data, I examine public outreach impacts through analytics from virtual networking tools including social media, NASA's Mission Tools Suite for Education, and field blog interactions.

  16. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1966-01-01

    The information given in this document is divided into two parts. In part I the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials delivered by Members up to 31 December 1965 in compliance with requests the Agency had made under Article IX. D. Part III contains information about materials which had not been delivered by 31 December but which had been allocated, in accordance with Article XI. F. 1 of the Statute, to approved Agency projects for which project arrangements were in force on that date

  17. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1965-01-01

    The information given in this document is divided into two parts. In part I the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials delivered by Members up to 31 December 1964 in compliance with requests the Agency had made under Article IX. D. Part II contains information about materials which had not been delivered by 31 December but which had been allocated, in accordance with Article XI. F. 1 of the Statute, to approved Agency projects for which project arrangements were in force on that date

  18. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1968-01-01

    The information given in this document is divided into two parts. In part I the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials delivered by Members up to 30 June 1968 in compliance with requests the Agency had made under Article IX,D. Part II contains information about materials which had not been delivered by 30 June 1968 but which had been allocated, in accordance with Article XI.F.I of the Statute, to approved Agency projects for which project arrangements were in force on that date

  19. Dynamic and Fatigue Analysis of an 18th Century Steel Arch Bridge

    International Nuclear Information System (INIS)

    Boumechra, Nadir; Hamdaoui, Karim

    2008-01-01

    Within the 'Oran-Tlemcen' railway line realization project (159 km), several bridges were built by the Railroads Algerian West Company. 7 km from the east of Tlemcen city, this railway line must cross a very broken mountainous collar, that's why the French engineer 'Gustave Eiffel' was solicited to construct a 68 m length bridge. In 1890, an arch steel truss bridge was realized. The bridge presents 300 m of apron curvature radius and, currently, is considered as one of the most important monuments of the Algerian historical heritage. Considering the age of the bridge and the evolution of the railway loads in time, it was essential to check the good behavior of the studied structure. For that, analyses to verify the physical and mechanical properties of the growth iron members are made. A finite element model of the bridge was built and numerical simulations were drawn. The structural vibration conducted analysis permit to understand the behavior of this particular structure, then to evaluate (in detail) the rate of the structure fatigue

  20. Application of Composite Structures in Bridge Engineering. Problems of Construction Process and Strength Analysis

    Science.gov (United States)

    Flaga, Kazimierz; Furtak, Kazimierz

    2015-03-01

    Steel-concrete composite structures have been used in bridge engineering from decades. This is due to rational utilisation of the strength properties of the two materials. At the same time, the reinforced concrete (or prestressed) deck slab is more favourable than the orthotropic steel plate used in steel bridges (higher mass, better vibration damping, longer life). The most commonly found in practice are composite girder bridges, particularly in highway bridges of small and medium spans, but the spans may reach over 200 m. In larger spans steel truss girders are applied. Bridge composite structures are also employed in cable-stayed bridge decks of the main girder spans of the order of 600, 800 m. The aim of the article is to present the cionstruction process and strength analysis problems concerning of this type of structures. Much attention is paid to the design and calculation of the shear connectors characteristic for the discussed objects. The authors focused mainly on the issues of single composite structures. The effect of assembly states on the stresses and strains in composite members are highlighted. A separate part of problems is devoted to the influence of rheological factors, i.e. concrete shrinkage and creep, as well as thermal factors on the stresses and strains and redistribution of internal forces.

  1. Design, fabrication and erection of Queen Mall Bridge; Queen mall kyo no sekkei seisaku kasetsu

    Energy Technology Data Exchange (ETDEWEB)

    Arai, M.; Ishii, A.; Shinohara, T. [Sumitomo Heavy Industries, Ltd., Tokyo (Japan)

    1997-12-20

    This paper describes design, fabrication and erection of Queen Mall Bridge, which is a new landmark in Minato-Mirai Yokohama. This bridge is two-span continuous cable stayed pedestrian bridge with a roof, and has a length 72.2 m, a width 18 m and a weight about 1,050 t. This bridge connects between the Queen`s Square and the second floor of Pacifico Yokohama. Achieving harmonious impression of the newly designed bridge in this area, glass roof was employed and all-weld method was applied to the in-site jointing of main girders and main tower in addition to the essential structural design. Since all-weld method was applied to the in-site jointing, highly accurate fabrication was considered during the in-site jointing. Due to the heavy traffic of the road below the bridge, the erection time was shortened under the severe erection conditions at night by large block method. Especially, accuracy control was considered for the whole shape management. Pre-assemble of all members was conducted just near the erection site, only 500 m away from the site, to shorten the construction time. 1 ref., 5 figs.

  2. Remarks on crack-bridging concepts

    International Nuclear Information System (INIS)

    Bao, G.; Suo, Z.

    1992-01-01

    The article draws upon recent work by us and our colleagues on metal and ceramic matrix composites for high temperature engines. The central theme here is to deduce mechanical properties, such as toughness, strength and notch-ductility, from bridging laws that characterize inelastic processes associated with fracture. A particular set of normalization is introduced to present the design charts, segregating the roles played by the shape, and the scale, of a bridging law. A single material length, γ 0 E/σ 0 , emerges, where γ 0 is the limiting-separation, σ 0 the bridging-strength, and E the Young's modulus of the solid. It is the huge variation of this length-from a few manometers for atomic bond, to a meter for cross-over fibers - that underlies the richness in material behaviors. Under small-scale bridging conditions, γ 0 E/σ 0 is the only basic length scale in the mechanics problem and represents, with a pre-factor about 0.4, the bridging zone size. A catalog of small-scale bridging solutions is compiled for idealized bridging laws. Large-scale bridging introduces a dimensionless group, a/(γ 0 E/σ 0 ), where a is a length characterizing the component. The group plays a major role in all phenomena associated with bridging, and provides a focus of discussion in this article. For example, it quantifies the bridging scale when a is the unbridged crack length, and notch-sensitivity when a is hole radius. The difference and the connection between Irwin's fracture mechanics and crack bridging concepts are discussed. It is demonstrated that fracture toughness and resistance curve are meaningful only when small-scale bridging conditions prevail, and therefore of limited use in design with composites. Many other mechanical properties of composites, such as strength and notch-sensitivity, can be simulated by invoking large-scale bridging concepts. 37 refs., 21 figs., 3 tabs

  3. Construction of a composite cable stayed bridge. Karnali river bridge in Nepal. Gosei shachokyo no kensetsu. Karnali kawa kyoryo

    Energy Technology Data Exchange (ETDEWEB)

    Maeda, M.; Nakamura, K.; Shimodoi, H.; Amako, M.; Miyoshi, S.; Haruta, M.; Okada, S.; Kuroki, S. (Kawasaki Heavy Industries, Ltd., Tokyo (Japan))

    1994-07-20

    The present report reports the construction of Karnali River Bridge in Nepal by Kawasaki Heavy Industries, Ltd. The present bridge is a composite cable stayed bridge, two-spanned with a main span length of 325m and side span length of 175m. Having an about 125m-high single tower, it is 11.3m in breadth and 3m in main truss height. The main truss is supported by both faces of 30 cables per face, i.e., 60 cables. (Each of both main and side spans has 15 cables per face.) The design and construction are described with the following their itemization: design (bending moment properties in the erected system, composite structure of main truss and stress analysis at the time of erection). Wind resisting measures (measures for the wind resistant stability at the time of erection of both tower and main truss cantilever). Fabrication and transportation of steel structural members. Fabrication of precast floor plates (concrete mixing, and fabrication and curing of floor plates). Construction of tower foundation (tremie concrete and air concrete). Erection of upper structures (erection of tower, both main and side spans, and accuracy management). 14 figs., 4 tabs.

  4. Area-based initiatives – and their work in bonding, bridging and linking social capital

    DEFF Research Database (Denmark)

    Agger, Annika; Jensen, Jesper Ole

    2015-01-01

    In this article, we provide a conceptual and argumentative framework for studying how Area-based Initiatives (ABIs) can facilitate contact between networks in deprived neighbourhoods and external forms of power (linking social capital). These relations provide the residents and other members...... of social capital (bridging, bonding and linking). The article concludes that ABIs contribute to creating linking social capital, but the extent of the contribution depends on the level of bonding and bridging social capital in the area. We argue that public planners as well as evaluators of the ABIs should...

  5. Road Bridges and Culverts, Bridge dataset only includes bridges maintained by Johnson County Public Works in the unincorporated areas, Published in Not Provided, Johnson County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Road Bridges and Culverts dataset current as of unknown. Bridge dataset only includes bridges maintained by Johnson County Public Works in the unincorporated areas.

  6. ALA Salary Survey: Personal Members

    Science.gov (United States)

    American Libraries, 1971

    1971-01-01

    A survey of the members of the American Library Association revealed that the principal salary determinants are academic degree, type of employer and sex. The obvious differences in the earnings of men and women is not only found in the early experience years but any narrowing which does take place in the wage gap seems to take place at the…

  7. Slovenia joins IPPOG as member

    CERN Multimedia

    'marcelloni, claudia

    2018-01-01

    Slovenia became an official member of IPPOG on 19 April 2018. The MOU was signed by the head of Particle Physics Department at Jozef Stefan Institute representing Slovenia participation at IPPOG. Andrej Gorišek, country representative for Slovenia in IPPOG, brought the document to the meeting in Italy where IPPOG chairs signed it, confirming Slovenia membership to the collaboration.

  8. Horizontal bridges in polar dielectric liquids

    Science.gov (United States)

    Woisetschläger, Jakob; Wexler, Adam D.; Holler, Gert; Eisenhut, Mathias; Gatterer, Karl; Fuchs, Elmar C.

    2012-01-01

    When a high-voltage direct-current is applied to two beakers filled with polar liquid dielectrica like water or methanol, a horizontal bridge forms between the two beakers. By repeating a version of Pellat's experiment, it is shown that a horizontal bridge is stable by the action of electrohydrodynamic pressure. Thus, the static and dynamic properties of the phenomenon called a `floating water bridge' can be explained by the gradient of Maxwell pressure, replenishing the liquid within the bridge against any drainage mechanism. It is also shown that a number of liquids can form stable and long horizontal bridges. The stability of such a connection, and the asymmetry in mass flow through such bridges caused by the formation of ion clouds in the vicinity of the electrodes, is also discussed by two further experiments.

  9. Horizontal bridges in polar dielectric liquids

    Energy Technology Data Exchange (ETDEWEB)

    Woisetschlaeger, Jakob [Graz University of Technology, Experimental Turbomachinery Research and Optical Measurement Group, Institute for Thermal Turbomachinery and Machine Dynamics, Graz (Austria); Wexler, Adam D.; Fuchs, Elmar C. [Wetsus, Center of Excellence for Sustainable Water Technology, Leeuwarden (Netherlands); Holler, Gert [Graz University of Technology, Institute of Electrical Measurement and Measurement Signal Processing, Graz (Austria); Eisenhut, Mathias [Graz University of Technology, Institute of Analytical Chemistry and Food Chemistry, Graz (Austria); Gatterer, Karl [Graz University of Technology, Institute of Physical and Theoretical Chemistry, Graz (Austria)

    2012-01-15

    When a high-voltage direct-current is applied to two beakers filled with polar liquid dielectrica like water or methanol, a horizontal bridge forms between the two beakers. By repeating a version of Pellat's experiment, it is shown that a horizontal bridge is stable by the action of electrohydrodynamic pressure. Thus, the static and dynamic properties of the phenomenon called a 'floating water bridge' can be explained by the gradient of Maxwell pressure, replenishing the liquid within the bridge against any drainage mechanism. It is also shown that a number of liquids can form stable and long horizontal bridges. The stability of such a connection, and the asymmetry in mass flow through such bridges caused by the formation of ion clouds in the vicinity of the electrodes, is also discussed by two further experiments. (orig.)

  10. Understanding Heterogeneous Preferences of Cooperative Members

    NARCIS (Netherlands)

    Kalogeras, N.; Pennings, J.M.E.; Lans, van der I.A.; Garcia, P.; Dijk, van G.

    2009-01-01

    We study the heterogeneity in the preference structure of cooperative members. Using conjoint analysis the utility that members attach to intra-organizational and strategic attributes of their cooperative is elicited. Recognizing that members are not homogenous, a concomitant finitemixture

  11. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction : research brief

    Science.gov (United States)

    2017-09-01

    This study is to develop simulation methodology to conduct the dynamic assessment of bridge deck performance subjected to traffic. Concrete bridge decks are exposed to daily traffic loads and may experience some surface cracking caused by excessive s...

  12. Development of a precast bridge deck overhang system for the rock creek bridge.

    Science.gov (United States)

    2008-12-01

    Precast, prestressed panels are commonly used at interior beams for bridges in Texas. The use of these : panels provides ease of construction, sufficient capacity, and good economy for the construction of : bridges in Texas. Current practice for the ...

  13. A data management infrastructure for bridge monitoring

    Science.gov (United States)

    Jeong, Seongwoon; Byun, Jaewook; Kim, Daeyoung; Sohn, Hoon; Bae, In Hwan; Law, Kincho H.

    2015-04-01

    This paper discusses a data management infrastructure framework for bridge monitoring applications. As sensor technologies mature and become economically affordable, their deployment for bridge monitoring will continue to grow. Data management becomes a critical issue not only for storing the sensor data but also for integrating with the bridge model to support other functions, such as management, maintenance and inspection. The focus of this study is on the effective data management of bridge information and sensor data, which is crucial to structural health monitoring and life cycle management of bridge structures. We review the state-of-the-art of bridge information modeling and sensor data management, and propose a data management framework for bridge monitoring based on NoSQL database technologies that have been shown useful in handling high volume, time-series data and to flexibly deal with unstructured data schema. Specifically, Apache Cassandra and Mongo DB are deployed for the prototype implementation of the framework. This paper describes the database design for an XML-based Bridge Information Modeling (BrIM) schema, and the representation of sensor data using Sensor Model Language (SensorML). The proposed prototype data management framework is validated using data collected from the Yeongjong Bridge in Incheon, Korea.

  14. Railway bridge monitoring during construction and sliding

    Science.gov (United States)

    Inaudi, Daniele; Casanova, Nicoletta; Kronenberg, Pascal; Vurpillot, Samuel

    1997-05-01

    The Moesa railway bridge is a composite steel concrete bridge on three spans of 30 m each. The 50 cm thick concrete deck is supported on the lower flanges of two continuous, 2.7 m high I-beams. The bridge has been constructed alongside an old metallic bridge. After demolishing this one, the new bridge has been slid for 5 m by 4 hydraulic jacks and positioned on the refurbished piles of the old bridge. About 30 fiber optic, low-coherence sensors were imbedded in the concrete deck to monitor its deformations during concrete setting and shrinkage, as well as during the bridge sliding phase. In the days following concrete pour it was possible to follow its thermal expansion due to the exothermic setting reaction and the following thermal and during shrinkage. The deformations induced by the additional load produced by the successive concreting phases were also observed. During the bridge push, which extended over six hours, the embedded and surface mounted sensors allowed the monitoring of the curvature variations in the horizontal plane due to the slightly uneven progression of the jacks. Excessive curvature and the resulting cracking of concrete could be ruled out by these measurements. It was also possible to observe the bridge elongation under the heating action of the sun.

  15. Review of Energy Harvesters Utilizing Bridge Vibrations

    Directory of Open Access Journals (Sweden)

    Farid Ullah Khan

    2016-01-01

    Full Text Available For health monitoring of bridges, wireless acceleration sensor nodes (WASNs are normally used. In bridge environment, several forms of energy are available for operating WASNs that include wind, solar, acoustic, and vibration energy. However, only bridge vibration has the tendency to be utilized for embedded WASNs application in bridge structures. This paper reports on the recent advancements in the area of vibration energy harvesters (VEHs utilizing bridge oscillations. The bridge vibration is narrowband (1 to 40 Hz with low acceleration levels (0.01 to 3.8 g. For utilization of bridge vibration, electromagnetic based vibration energy harvesters (EM-VEHs and piezoelectric based vibration energy harvesters (PE-VEHs have been developed. The power generation of the reported EM-VEHs is in the range from 0.7 to 1450000 μW. However, the power production by the developed PE-VEHs ranges from 0.6 to 7700 μW. The overall size of most of the bridge VEHs is quite comparable and is in mesoscale. The resonant frequencies of EM-VEHs are on the lower side (0.13 to 27 Hz in comparison to PE-VEHs (1 to 120 Hz. The power densities reported for these bridge VEHs range from 0.01 to 9539.5 μW/cm3 and are quite enough to operate most of the commercial WASNs.

  16. A Polish approach to FRP bridges

    Science.gov (United States)

    Siwowski, Tomasz; Rajchel, Mateusz

    2017-12-01

    The paper presents initial results of a new approach to FRP composite bridge construction that is presently being developed and tested in Poland. The concept combines lightweight concrete with FRP composites to create a durable highly optimised structure. The paper describes the bridge system itself and presents the research results on its development. The basic design is presented together with research results on its development: FEM analysis and a range of static test results of full-scale bridge beam experiments. The paper finishes with some test results of a full scale bridge that was constructed near Rzeszow in December 2015.

  17. SURVEY RESULTS AND TESTING OF RAILWAY BRIDGES

    Directory of Open Access Journals (Sweden)

    I. H. Haniiev

    2010-03-01

    Full Text Available The article is devoted to the survey and testing of railway bridges by the State Joint-Stock Railway Company «Uzbekiston Temir Yollari» («Uzbekistan Railways». It is stated that in the existing rules on determination of the capacity of bridges the recommendations on taking into account the cumulative deflection to the moment of technical diagnostics of spans on the bridge capacity are absent. The author states on the need to develop a method for determining the wear of spans on restriction of the residual deflection in the bridge floor slabs.

  18. 23 CFR 650.409 - Evaluation of bridge inventory.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge inventory, a sufficiency rating will be assigned to each bridge by the Secretary in accordance with the...

  19. 23 CFR 650.809 - Movable span bridges.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  20. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  1. 33 CFR 118.70 - Lights on swing bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on swing bridges. 118.70 Section 118.70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each...

  2. 33 CFR 118.85 - Lights on vertical lift bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  3. 33 CFR 118.65 - Lights on fixed bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on fixed bridges. 118.65 Section 118.65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable...

  4. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Science.gov (United States)

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  5. Laboratory Testing of Precast Bridge Beck Panel Transverse Connections for Use in Accelerated Bridge Construction

    OpenAIRE

    Porter, Scott D.

    2009-01-01

    Precast concrete bridge deck panels have been used for decades to accelerate bridge construction. Cracking of the transverse connection between panels is a common problem that can damage deck overlays and cause connection leaking leading to corrosion of lower bridge elements. To better understand the behavior of bridge deck transverse female-to-female connections, shear and moment lab testing were performed at Utah State University for the Utah Department of Transportation. Two existing UDOT ...

  6. Community Members Draw the Line

    Directory of Open Access Journals (Sweden)

    Gregory Freeland

    2014-06-01

    Full Text Available This study investigates whether a community-based task force’s redistricting plan in Ventura County, California, positively affected fair representation, social equity issues, community interests, and the electoral process. Examination and evaluation of the organizational strategies and collaborations involved in the task force’s redistricting process find that the Board of Supervisors districts that members of the community drew were successful in improving and maintaining fair representation. This finding is based on comparing supervisorial votes and policies with community members’ votes on state propositions and local measures, in addition to conducting interviews with task force members, politicians, and community activists. This study finds that citizen participation in governmental processes improves overall community health and political participation.

  7. Power reactors in member states

    International Nuclear Information System (INIS)

    1975-01-01

    This is the first issue of a periodical computer-based listing of civilian nuclear power reactors in the Member States of the IAEA, presenting the situation as of 1 April 1975. It is intended as a replacement for the Agency's previous annual publication of ''Power and Research Reactors in Member States''. In the new format, the listing contains more information about power reactors in operation, under construction, planned and shut down. As far as possible all the basic design data relating to reactors in operation have been included. In future these data will be included also for other power reactors, so that the publication will serve to give a clear picture of the technical progress achieved. Test and research reactors and critical facilities are no longer listed. Of interest to nuclear power planners, nuclear system designers, nuclear plant operators and interested professional engineers and scientists

  8. New offer for our members

    CERN Document Server

    Staff Association

    2018-01-01

    Evolution 2, your specialist for Outdoor Adventures Be it for a ski lesson, a parachute jump or for a mountain bike descent, come live an unforgettable experience with our outdoor specialists. Benefit from a 10 % discount on all activities: Offer is open to SA members and their family members living in the same household, upon presentation of the membership card. Offer available for all bookings made between 1 June 2018 and 30 May 2019. Offer available on all the Evoltion2 sites. A wide range of summer and winter activities. More information on http://evolution2.com/ Contact and reservation : +33 (0)4.50.02.63.35 management@evolution2.com

  9. Materials Delivered by Member States

    International Nuclear Information System (INIS)

    1962-01-01

    The information given in this document is divided into two parts. In part I the Director General is reporting to the Members of the Agency, under Article IX. G of the Statute, the quantities of materials delivered up to 30 September 1962 by Member States in compliance with requests the Agency has made under Article IX. D. Part II contains information about materials which have not yet been delivered but which have been allocated, in accordance with Article XI. F. 1 of the Statute, to approved Agency projects for which project agreements were in force on 30 September 1962. Reports on subsequent deliveries of materials and revised information about allocated but undelivered materials will be issued from time to time

  10. Communication Among Melanoma Family Members

    Science.gov (United States)

    Bowen, Deborah J; Albrecht, Terrance; Hay, Jennifer; Eggly, Susan; Harris-Wei, Julie; Meischke, Hendrika; Burke, Wylie

    2017-01-01

    Interventions to improve communication among family members may facilitate information flow about familial risk and preventive health behaviors. This is a secondary analysis of the effects of an interactive website intervention aimed at increasing communication frequency and agreement about health risk among melanoma families. Participants were family units, consisting of one family member with melanoma identified from a previous research study (the case) and an additional first degree relative and a parent of a child 0–17. Family triads were randomized to receive access to the website intervention or to serve as control families. Family communication frequency and agreement about melanoma prevention behaviors and beliefs were measured at baseline and again at one year post randomization. Intervention participants of all three types significantly increased the frequency of communication to their first degree relatives (Parents, siblings, children; range =14–18 percentage points; all pcommunication about cancer risk. PMID:28248624

  11. New support line for members

    Science.gov (United States)

    AGU has recently established a new customer "support line"—solutions@agu.org—as the point of contact on AGU's staff for members and other individual constituents who have not been able to resolve issues or get questions answered promptly or to their satisfaction through customary channels.Over the past year, there have been many changes at AGU. Unfortunately—and perhaps as a result of these changes—communication with members and individual constituents has suffered. Some individuals report, for example, that e-mail messages are not answered to their satisfaction, or in a timely manner. Instructions on AGU's Web site are unclear in some areas. Problems related specifically to the transition to electronic publishing are cropping up.

  12. Thermal bridges of modern windows

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Møller, Eva B.; Nielsen, Anker

    2013-01-01

    if the window has an U-factor of 1 W/(m2·K) or lower. This paper describes the development of modern, energy efficient Danish windows with reduced thermal bridges. It focuses on materials, geometry, and sealing of window panes based on a literature review. Examples of modern windows are presented. Experience...... been an important driver for the development of new window solutions in Denmark, increasing the inner-surface temperature at the sealing of window panes. However, it will not stop complaints fromconsumers, as this temperature is calculated under standardized conditions. Increasing requirements...

  13. A bridge to advanced mathematics

    CERN Document Server

    Sentilles, Dennis

    2011-01-01

    This helpful workbook-style ""bridge"" book introduces students to the foundations of advanced mathematics, spanning the gap between a practically oriented calculus sequence and subsequent courses in algebra and analysis with a more theoretical slant. Part 1 focuses on logic and number systems, providing the most basic tools, examples, and motivation for the manner, method, and concerns of higher mathematics. Part 2 covers sets, relations, functions, infinite sets, and mathematical proofs and reasoning. Author Dennis Sentilles also discusses the history and development of mathematics as well a

  14. Nanoclusters a bridge across disciplines

    CERN Document Server

    Jena, Purusottam

    2010-01-01

    This comprehensive book on Nanoclusters comprises sixteen authoritative chapters written by leading researchers in the field. It provides insight into topics that are currently at the cutting edge of cluster science, with the main focus on metal and metal compound systems that are of particular interest in materials science, and also on aspects related to biology and medicine. While there are numerous books on clusters, the focus on clusters as a bridge across disciplines sets this book apart from others. Delivers cutting edge coverage of cluster science Covers a broad range of topics in

  15. Quantum Bridge Fabrication Using Photolithography

    International Nuclear Information System (INIS)

    Quinones, R.

    2001-01-01

    The need for high-speed performance electronics in computers integrated circuits and sensors, require the fabrication of low energy consumption diodes. Nano fabrication methods require new techniques and equipment. We are currently developing a procedure to fabricate a diode based on quantum-effects. The device will act like a traditional diode, but the nanometer scale will allow it to reach high speeds without over heating. This new diode will be on a nano-bridge so it can be attenuated by an electromagnetic wave. The goal is to obtain similar current vs voltage response as in a silicon diode

  16. Reduction of seismic response long-span PC cable-stayed bridge by passive dampers; Damper ni yoru saidai PC shachokyo no jishinji oto no teigen

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, T.; Yamanobe, S.; Niihara, Y. [Kajima Corp., Tokyo (Japan)

    1994-10-31

    It is important in designing a PC cable-stayed bridge to properly estimate the seismic response of the bridge for reduction of the response. In this paper, an improvement of the seismic resistance of PC cable-stayed bridges when dampers are installed between the deck and piers and lateral vibration of the deck is restricted is investigated using a time history response model. PC cable-stayed bridges with a span length of 400 m, particularly two types of bridges of harp and semi-harp are investigated and the following is found by analyzing the case where there are installed hysteresis type dampers (with 1 cm yield displacement and secondary rigidity assumed to be 1/10 times that of initial rigidity, the initial rigidity being parametrically changed.) or viscous type dampers (a damping factor is changed.) The result shows that the dampers can reduce the seismic response of a PC cable-stayed bridge and that a semi-harp configuration of stay cables where stay cable members are substantially vertically arranged is more effective than a harp configuration for the seismic performance of PC cable-stayed bridges. The damper partly bear inertial force of the bridge upon earthquake whereby tension of the stay cable members is reduced and bending moment of the deck is reduced. There is existing an optimum characteristic value of the damper concerning the bending moment of the piers. 5 refs., 7 figs., 2 tabs.

  17. Towards mobile staff members management

    Science.gov (United States)

    Encheva, Sylvia

    2017-07-01

    Todays project management requires a number of abilities which involve finding quick solutions to shortage of staff members with possession of specific qualities. When persons with team responsibilities are under pressure or due to various circumstances are unable to perform exhaustive search in databases, an interactive visualization tool can come in quite handy in finding good solutions unforeseen occurrences. In particular we propose application of selected graphs for facilitating mobile human resource management.

  18. Shielding member for thermonuclear device

    Energy Technology Data Exchange (ETDEWEB)

    Onozuka, Masanori

    1997-06-30

    In a thermonuclear device for shielding fast neutrons by shielding members disposed in a shielding vessel (vacuum vessel and structures such as a blanket disposed in the vacuum vessel), the shielding member comprises a large number of shielding wires formed fine and short so as to have elasticity. The shielding wires are sealed in a shielding vessel together with water, and when the width of the shielding vessel is changed, the shielding wires follow after the change of the width while elastically deforming in the shielding vessel, so that great stress and deformation are not formed thereby enabling to improve reliability. In addition, the length, the diameter and the shape of each of the shielding wires can be selected in accordance with the shielding space of the shielding vessel. Even if the shape of the shielding vessel is complicated, the shielding wires can be inserted easily. Accordingly, the filling rate of the shielding members can be changed easily. It can be produced more easily compared with a conventional spherical pebbles. It can be produced more easily than existent spherical shielding pebbles thereby enabling to reduce the production cost. (N.H.)

  19. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Science.gov (United States)

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  20. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  1. Light-weight aluminium bridges and bridge decks. An overview of recent applications

    NARCIS (Netherlands)

    Maljaars, J.; Soetens, F.; Kluyver, D. de

    2008-01-01

    The last decades have shown a large increase in the application of aluminium alloys for light-weight bridges. For bridge construction, aluminium alloys have some specific advantages, but also some points of attention. This paper deals with some recent projects of aluminium bridges, and for these

  2. Extended lanthanide-transition metal arrays with cyanide bridges: syntheses, structures, and catalytic applications

    International Nuclear Information System (INIS)

    Liu Shengming; Poplaukhin, Pavel; Ding Errun; Plecnik, Christine E.; Chen Xuenian; Keane, Mark A.; Shore, Sheldon G.

    2006-01-01

    Systematic synthetic procedures produced several different structural types of extended lanthanide-transition metal (group 10) complexes with cyanide bridges. Of these, one-dimensional ladder arrays containing a Yb-Pd combination have been converted to bimetallic heterogeneous catalysts on an oxide (SiO 2 ) surface that is more effective than supported Pd alone. Two lanthanide-Cu(I) complexes have been prepared. One type, an inclusion complex consists of lanthanide(III) cations encapsulated in the pockets of a three-dimensional anionic array that contains Cu(I)-CN-Cu(I) bridges. The second type, an extended layer complex, consists of joined five-membered rings in a 'tile-like' pattern with Ln-CN-Cu and Cu-CN-Cu bridges

  3. Soil Structure Interaction for Integral Abutment Bridge Using Spring Analogy Approach

    International Nuclear Information System (INIS)

    Thanoon, W A; Abdulrazeg, A A; Jaafar, M S; Kohnehpooshi, O; Noorzaei, J

    2011-01-01

    The reaction of the backfill behind the abutments and adjacent to the piles plays a significant role in the behavior of the Integral bridge. The handling of soil-structure interaction in the analysis and design of integral abutment bridges has always been problematic due to its complexity. This study describes the implementation of a 2-D finite element model of IAB system which explicitly incorporates the soil response. The superstructure members and the pile have been represented by means of three-node isoperimetric beam elements with three degree of freedom per node. The Eight node isoperimetric quadrilateral element has been used to model the abutment. The backfill was idealized by uncoupled 'Winkler' spring. The applic1ability of this model is demonstrated by analyzing a single span IA bridge. The results have shown that the shear forces at the tops of the supported piles were only 12% to 16% of the load which at the top of abutment.

  4. Soil Structure Interaction for Integral Abutment Bridge Using Spring Analogy Approach

    Energy Technology Data Exchange (ETDEWEB)

    Thanoon, W A [Faculty Engineering, Nizwa University (Oman); Abdulrazeg, A A; Jaafar, M S; Kohnehpooshi, O [Department of Civil Engineering, University Putra Malaysia, 43400 Serdang, Selangor (Malaysia); Noorzaei, J, E-mail: jamal@eng.upm.edu.my [Institute of Advance Technology, University Putra Malaysia, 43400 Serdang, Selangor (Malaysia)

    2011-02-15

    The reaction of the backfill behind the abutments and adjacent to the piles plays a significant role in the behavior of the Integral bridge. The handling of soil-structure interaction in the analysis and design of integral abutment bridges has always been problematic due to its complexity. This study describes the implementation of a 2-D finite element model of IAB system which explicitly incorporates the soil response. The superstructure members and the pile have been represented by means of three-node isoperimetric beam elements with three degree of freedom per node. The Eight node isoperimetric quadrilateral element has been used to model the abutment. The backfill was idealized by uncoupled 'Winkler' spring. The applic1ability of this model is demonstrated by analyzing a single span IA bridge. The results have shown that the shear forces at the tops of the supported piles were only 12% to 16% of the load which at the top of abutment.

  5. A bridge with a view, a view with a bridge : Identifying design considerations for bridges to strengthen regional identity

    NARCIS (Netherlands)

    Smits, J.E.P.; van der Hoeven, F.D.

    2015-01-01

    This paper discusses design considerations for creating high quality infrastructural artefacts with an emphasis on bridges. The authors pursue a design study and analysis approach to highlight the specifics of infrastructure design for regional identity, based on their own work on a bridge

  6. Salt-bridge energetics in halophilic proteins.

    Science.gov (United States)

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are -3.0 kcal mol-1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of -5.0 kcal mol-1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (-10 kcal mol-1) exceeds than that of bridge term (-7 kcal mol-1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its

  7. Bridging history and social psychology

    DEFF Research Database (Denmark)

    Glaveanu, Vlad Petre; Yamamoto, Koji

    2012-01-01

    This special issue aims to bridge history and social psychology by bringing together historians and social psychologists in an exercise of reading and learning from each other’s work. This interdisciplinary exercise is not only timely but of great importance for both disciplines. Social psycholog......This special issue aims to bridge history and social psychology by bringing together historians and social psychologists in an exercise of reading and learning from each other’s work. This interdisciplinary exercise is not only timely but of great importance for both disciplines. Social...... psychologists can benefit from engaging with historical sources by being able to contextualise their findings and enrich their theoretical models. It is not only that all social and psychological phenomena have a history but this history is very much part of present-day and future developments. On the other...... hand historians can enhance their analysis of historical sources by drawing upon the conceptual tools developed in social psychology. They can “test” these tools and contribute to their validation and enrichment from completely different perspectives. Most important, as contributions to this special...

  8. The Bridge of Mandolin County

    Science.gov (United States)

    Lantz, Juliette M.; Feindt, Jenny E.; Lewellyn, Eric P. B.; Walczak, Mary M.

    1999-12-01

    The Bridge of Mandolin County is a case designed to teach the general chemistry principles of molar mass, ions and aqueous reactions, solubility rules, and inorganic nomenclature. Through the instructor-facilitated class discussion, students consider the options before the Mandolin Town Council regarding deicing the newly constructed bridge connecting Mandolin with a large nearby city. The students must decipher contradictory claims made on behalf of sodium chloride, the traditional deicer, and calcium magnesium acetate, a new environmentally friendly deicer, to arrive at the most cost-effective and environmentally appropriate deicing product. As they work through the analysis they raise questions that can be addressed in a laboratory setting. Four optional role-playing experiments are included, which can be used by the students to gather information helpful to resolution of the case. The case is intended to be used over two class periods, with a laboratory period in between, though suggestions for other models are provided. Laboratory procedures include an EDTA titration for Ca2+ and Mg2+, a gravimetric analysis, a qualitative examination of ions and solubility, an introduction to freezing point depression and measurement, and an experimental design activity. This case can also successfully be used without alteration in non-majors chemistry or environmental chemistry courses, or upper-level analytical or environmental chemistry courses.

  9. Design aids of NU I-girders bridges.

    Science.gov (United States)

    2010-05-01

    Precast prestressed concrete I-Girder bridges have become the most dominant bridge system in the United States. In the early design : stages, preliminary design becomes a vital first step in designing an economical bridge. Within the state of Nebrask...

  10. An expert system for the esthetic rating of bridges.

    Science.gov (United States)

    1990-01-01

    The expert system presented should facilitate the in-depth analysis of bridge esthetics and encourage high standards for the appearance of bridges. The procedure described systematically evaluates features of a target bridge in relation to a similar ...

  11. Long-term behavior of integral abutment bridges : [technical summary].

    Science.gov (United States)

    2011-01-01

    Integral abutment bridges, a type of jointless bridge, are the construction option of choice when designing highway bridges in many parts of the country. Rather than providing an expansion joint to separate the substructure from the superstructure to...

  12. Implementation of sustainability in bridge design, construction and maintenance.

    Science.gov (United States)

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  13. Seismic retrofit of spliced sleeve connections for precast bridge piers.

    Science.gov (United States)

    2017-03-01

    Grouted Splice Sleeve (GSS) connectors are being considered for connecting bridge columns, footings, and pier caps in Accelerated Bridge Construction (ABC). A repair technique for precast reinforced concrete bridge column-to-footing and column-to-pie...

  14. 0-6722 : spread prestressed concrete slab beam bridges.

    Science.gov (United States)

    2014-08-01

    The Texas Department of Transportation uses : precast prestressed concrete slab beam bridges for : shorter-span bridges of approximately 3050 ft in : length. Conventional slab beam bridges have slab : beams placed immediately adjacent to one anoth...

  15. Pilot Study for Investigating the Cyclic Response of the Recentering Bridge Bearing System Combined with the Friction Damper

    Directory of Open Access Journals (Sweden)

    Jong Wan Hu

    2016-01-01

    Full Text Available The bridge bearing is one of the component members which provide resting supports between piers and decks. The bridge bearing is intended to control longitudinal movement caused by traffic flow and thermal expansion, thereby reducing stress concentration. In high seismicity area, the bridge bearing has been utilized as the base isolation system to mitigate acceleration transferred from the ground. Although the existing bridge bearing installed between superstructure and substructure provides extra flexibility to the base of the entire structure, considerable permanent deformation occurs due to lack of recentering capacity after earthquake. It is required to spend extra cost for repairing impaired parts. The bridge bearings integrated with superelastic shape memory alloy (SMA devices used for upgrading the recentering effect into the friction damper are proposed in this study. The refined finite element (FE analyses are introduced to reproduce the response of such new structures under cyclic loading condition. The bridge bearing systems that maintain uniform recentering capability are designed with various friction coefficients so as to examine energy dissipation and residual deformation through FE analyses. After observing FE analysis results, optimal design for the recentering bridge bearing system will be proposed to take advantage of energy dissipation and self-centering capacity.

  16. Re-Assessment of Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper two aspects of re-assessment of the reliability of concrete bridges are discussed namely modelling of the corrosion of reinforcement and updating of uncertain variables. The main reason for deterioration of concrete bridges is corrosion of the reinforcement. Therefore, modelling...

  17. STUDY OF BRIDGE DECK A REVIEW

    OpenAIRE

    MISS. KSHITIJA S. BALWAN , MR. V. G. KHURD , MR. S. S. CHOUGULE

    2018-01-01

    The objective of this study was to understand the meaning of bridge deck. To know the different forms of decks used in bridge design. To understand different methods used for analysis of deck and study of box girder and its evolution

  18. Rapid replacement/construction of bridges.

    Science.gov (United States)

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  19. Neighborhood Bridges: 2010-2011 Evaluation Report

    Science.gov (United States)

    Ingram, Debra

    2011-01-01

    In 2010-2011, students in twenty-five classrooms from eleven schools in the Minneapolis-Saint Paul metropolitan area participated in The Children's Theatre Company's Neighborhood Bridges (Bridges) program. The Children's Theatre Company contracted with the University of Minnesota's Center for Applied Research and Educational Improvement (CAREI) to…

  20. Planar Hall effect bridge magnetic field sensors

    DEFF Research Database (Denmark)

    Henriksen, A.D.; Dalslet, Bjarke Thomas; Skieller, D.H.

    2010-01-01

    Until now, the planar Hall effect has been studied in samples with cross-shaped Hall geometry. We demonstrate theoretically and experimentally that the planar Hall effect can be observed for an exchange-biased ferromagnetic material in a Wheatstone bridge topology and that the sensor signal can...... Hall effect bridge sensors....

  1. Analysis of Biaxially Stressed Bridge Deck Plates

    DEFF Research Database (Denmark)

    Jönsson, Jeppe; Bondum, Tommi Højer

    2012-01-01

    The ultimate state analysis of bridge deck plates at the intersection zone between main girders and transverse beams is complicated by biaxial membrane stresses, which may be in compression or tension in either direction depending on the bridge configuration and the specific location. This paper...

  2. Chapter 10:Hardwoods for timber bridges

    Science.gov (United States)

    James P. Wacker; Ed T. Cesa

    2005-01-01

    This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  3. Bridges Over Troubled Waters: Theoretical Linguistics And ...

    African Journals Online (AJOL)

    This paper tries to construct a bridge between the concerns of theoretical linguistics and those of multilingualism and code-switching (CS) research. It argues that the primary special point of interaction between these fields lies in the question of potential equivalence between elements or categories, bridging across ...

  4. 7 CFR 1425.19 - Member cooperatives.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Member cooperatives. 1425.19 Section 1425.19... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS COOPERATIVE MARKETING ASSOCIATIONS § 1425.19 Member cooperatives. A CMA may obtain loans or LDP's on behalf of a member cooperative when the member...

  5. Strategies For The Replacement Of Historic Bridge Guardrails

    OpenAIRE

    Clauss, Adam J.

    2014-01-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridges can be subject to protection because of the role they play in aesthetics. Unfortunately, original railings on historic bridges do not typically meet current crash-test requirements and typically do not meet current standards for railing height and...

  6. The I-35W bridge Project Website

    DEFF Research Database (Denmark)

    Kampf, Constance

    How can websites be used to rebuild trust?  In August 2007, the Interstate Highway 35-W bridge in Minneapolis, MN collapsed during rush hour.  Although many people were rescued and casualties were as limited as could be expected due to quick and effective intervention, the image of a major bridge...... collapsing during rush hour damaged the Minnesota Department of Transportation's reputation and resulted in the loss of public trust for the organization.  The ensuing bridge reconstruction project included a project website intended to rebuild this trust through transparency, community involvement......, and the use of multimodal features.  This paper looks at the I35-W bridge reconstruction project in Minneapolis through web-based communication by the Minnesota Department of Transportation (MnDOT) about the project. The MnDOT bridge reconstruction website will be examined using a combination of 1). Weick...

  7. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  8. New conceptual design of portable bamboo bridge for emergency purposes

    Science.gov (United States)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  9. Einstein-Rosen 'bridge' revisited and lightlike thin-shell wormholes

    International Nuclear Information System (INIS)

    Guendelman, E.; Nissimov, E.; Pacheva, S.; Stoilov, M.

    2017-01-01

    We study in some detail the properties of the mathematically correct formulation of the classical Einstein-Rosen 'bridge' as proposed in the original 1935 paper, which was shown in a series of previous papers of ours to represent the simplest example of a static spherically symmetric traversable lightlike thin-shell wormhole. Thus, the original Einstein-Rosen 'bridge' is not equivalent to the concept of the dynamical and non-traversable Schwarzschild wormhole, also called 'Einstein-Rosen bridge' in modern textbooks on general relativity. The original Einstein-Rosen 'bridge' requires the presence of a special kind of 'exotic' matter source located on its throat which was shown to be the simplest member of the previously introduced by us class of lightlike membranes. We introduce and exploit the Kruskal-Penrose description of the original Einstein-Rosen 'bridge'. In particular, we explicitly construct closed timelike geodesics on the pertinent Kruskal-Penrose manifold.

  10. Modern techniques in prestressed concrete cable-stayed bridges. Puresutoresuto concrete shachokyo ni okeru atarashii gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Miyamoto, A. (Kobe Univ. (Japan). Faculty of Engineering)

    1994-03-31

    Because the prestressed concrete (PC) cable-stayed bridges combine the distinctive features such as a rationality of the structure or a structural beauty, it will not stay on a development of the technologies to make them longer and larger, and a rationalization of the execution, an investigation from various aspects such as the scenery design, material selection, pursuit of new structure and so forth will become necessary. In a main meeting, 15 volumes of paper on the most advanced technologies of PC cable-stayed bridges were presented. The presentations from Japan were 11 volumes, and occupied about 70%, and therefore a high interest to the PC cable-stayed bridges in Japan was inferred. In the presentation from Japan, there were many relevancies of the important study themes which would become a foundation for a development of PC cable-stayed bridges in the future, like ones that an improvement effect of dynamic behavior such as the aseismatic property, wind endurance and so forth was made as an objective, ones that a safety evaluation at an ultimate state as the oblique member anchoring part, main tower or entire structure was related, ones that a construction of the various control systems when the cable-stayed bridges were executed was concerned and so forth. 23 figs., 1 tab.

  11. Root coverage with bridge flap

    Directory of Open Access Journals (Sweden)

    Pushpendra Kumar Verma

    2013-01-01

    Full Text Available Gingival recession in anterior teeth is a common concern due to esthetic reasons or root sensitivity. Gingival recession, especially in multiple anterior teeth, is of huge concern due to esthetic reasons. Various mucogingival surgeries are available for root coverage. This case report presents a new bridge flap technique, which allows the dentist not only to cover the previously denuded root surfaces but also to increase the zone of attached gingiva at a single step. In this case, a coronally advanced flap along with vestibular deepening technique was used as root coverage procedure for the treatment of multiple recession-type defect. Here, vestibular deepening technique is used to increase the width of the attached gingiva. The predictability of this procedure results in an esthetically healthy periodontium, along with gain in keratinized tissue and good patient′s acceptance.

  12. Building bridges … and accelerators

    CERN Multimedia

    2009-01-01

    Lyn Evans, the LHC project leader, was awarded an honorary doctorate from the University of Geneva (UNIGE) to celebrate his role not just in building accelerators, but also in building bridges between nations. He was one of four notables honoured at the event on Friday 5 June, coinciding with the University’s 450th Anniversary. Lyn Evans arriving at the ceremony with Archbishop Desmond Tutu. "It was a big surprise when I found out I’d been nominated," recounts Evans, "but it was an even bigger surprise to find out with whom I’d been nominated". At the ceremony Evans was awarded the honorary doctorate along with three others: Archbishop Desmond Tutu, who was acclaimed for his fight against apartheid in South Africa, Mary Robinson, first woman president of Ireland and former United Nations’ high commissioner of human rights, and Pascal Lamy, Director-General of the World Trade Organization. The award ceremony, known as the �...

  13. Connecting people and information: how an African special library is building bridges

    CSIR Research Space (South Africa)

    Halland, Y

    2009-04-30

    Full Text Available : How an African Special Library is Building Bridges Yvonne Halland, BA Library Science Strategic Information Resources Coordinator CSIR Information Services Pretoria, South Africa Member, Science & Technology Division Noxolo Mniki... delivery, information literacy training and knowledge management. Although the CSIR library was at one time regarded as the top science & technology library in the country, the upward spiralling costs of information resources over the last twenty...

  14. Implementation of Bridge Management System on Interurban Bridge in Maluku Province

    Directory of Open Access Journals (Sweden)

    Erwin Marasabessy

    2015-05-01

    Full Text Available Bridges as transport infrastructures play a vital role in smoothing traffic flows. The success of a bridge in playing its role and serving its function depends on its management. The Directorate General of Highways of the Ministry of Public Work has used a system to manage bridges known as the Bridge Management System (BMS. The system allows a systematic plan and provides a uniform procedure for all bridge operation activities on the national and provincial level. Data from Implementation Agency of National Inter-Urban Roads of Area IX, Northern Maluku in 2011 indicates that the total length of national roads in Maluku Province is 15,238.01 M, with a total of 562 bridges. In Ambon Island, especially, there are 52 bridges totaling 1,176.25 m in length. The study was conducted at several inter-urban bridges in Maluku Province of Ambon Island: Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari and Wai Tua bridges. Assessment of bridge structure conditions was conducted visually to determine the conditions of the existing bridges comprehensively by referring to the Bridge Management System (BMS complemented with a computer-based Bridge Management Information System (BMIS. Condition scores for the five bridges—Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua, according to Bridge Management System, are 2, 1, 2, 1, and 2 respectively. The scores of the five bridges indicate that their physical condition can be categorized as good or with minor defects. Based on technical screening, the proposed treatment for Wai Batu Merah, Wai Ruhu, Wai Lawa, dan Wai Tua bridges is the rehabilitation of their sub-elements. As for the Wai Yari Bridge, the treatment will be maintained regularly. The defect repair costs are IDR 149,138,238.00, IDR 81,048,000.00, IDR 174,579,106.10, IDR 79,233,324.01 and IDR 238,323,258.60 for Wai Batu, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua Bridges, respectively.

  15. Hydraulic modeling of flow impact on bridge structures: a case study on Citarum bridge

    Science.gov (United States)

    Siregar, R. I.

    2018-02-01

    Flood waves because of the rapid catchment response to high intense rainfall, breaches of flood defenses may induce huge impact forces on structures, causing structural damage or even failures. Overflowing stream that passes over the bridge, it means to discharge flood water level is smaller than the capacity of the river flow. In this study, the researches present the methodological approach of flood modeling on bridge structures. The amount of force that obtained because of the hydrostatic pressure received by the bridge at the time of the flood caused the bridge structure disrupted. This paper presents simulation of flow impact on bridge structures with some event flood conditions. Estimating the hydrostatic pressure developed new model components, to quantify the flow impact on structures. Flow parameters applied the model for analyzing, such as discharge, velocity, and water level or head that effect of bridge structures. The simulation will illustrate the capability of bridge structures with some event flood river and observe the behavior of the flow that occurred during the flood. Hydraulic flood modeling use HEC-RAS for simulation. This modeling will describe the impact on bridge structures. Based on the above modelling resulted, in 2008 has flood effect more than other years on the Citarum Bridge, because its flow overflow on the bridge.

  16. Track-Bridge Longitudinal Interaction of Continuous Welded Rails on Arch Bridge

    Directory of Open Access Journals (Sweden)

    Rong Chen

    2013-01-01

    Full Text Available Taking arch bridges, including deck, half-through, and through arch bridges (short for DAB, HTAB, and TAB as examples, mechanics analysis models of longitudinal interaction between continuously welded rails (short for CWRs and arch bridges are established. Based on the finite element method (FEM, the longitudinal interaction calculation software of CWR on arch bridges has been developed. Focusing on an HTAB, the tension, compression, and deflection conditions are calculated and analyzed. The results show that the mechanics analysis models of three types of arch bridges can truly reflect the real state of the structure; the calculation software can be used for systematic research of the CWR on arch bridge; as for HTAB, temperature difference of arch rib has a small effect on rail tension/compression, and arch bridge can be simplified as a continuous beam for rail tension/compression additional force calculation; in calculation of deflection conditions of HTAB, it is suggested that train loads are arranged on half span and full span and take the direction of load entering bridge into account. Additionally, the deflection additional force variation of CFST basket handle arch bridge is different from that of ordinary bridge.

  17. Construction work of superstructure of twin harp bridge. Twin harp kyo jobuko no seko

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, H.; Sato, Y.; Kanazawa, Y. (Sumitomo Construction Kajima Corp. Dopy Construction Co. Ltd. Nihon Koatsu Concrete Co. Ltd. Joint Venture, Tokyo (Japan)); Sema, M. (Sumitomo Construction Co. Ltd., Tokyo (Japan))

    1991-11-30

    Construction plan outline of PC cable stayed bridge with main tower having one pillar structure is introduced and this is the first type of bridge in Japan with three continuous span design. Construction was commenced on 7 July, 1989 and was completed on 8 August, 1991 at south east of Ashahikawa, Hokkaido. Construction outline is consisted of Principal specifications, general layout of structure, construction order and overall stage of the construction work. Main tower is described by its outline, jump system, installation of diagonal member anchorage device, formwork and concrete structure, and cross beam construction has included four parts which are outline, capital part, projected part construction, lateral span and closure part, and central control span and closure part. Outline, cable guard and erection work, cable work, work Procedure of cable taut construction using total taut method, tension adjustment of cable and grouting, for diagonal member are explained. The construction control items specific to cable stayed bridge are diagonal member tension control( control of applied tension, change of tension with time and test taut ) and camber control. Practical vibration test was carried out on March, 1991. 8 refs., 15 figs., 5 tabs.

  18. “On a bridge in Berlin”

    DEFF Research Database (Denmark)

    Pihl, Ole Verner

    2013-01-01

    This is a self-reflective case study based on the development of the Graphic Novel: “On a bridge in Berlin.” The GN will be used as an introduction to the history of architecture as a part of the curriculum in Architecture and Design at Aalborg University, and as a more broadly introduction...... that jumps in time and place: it begins with Martin Heidegger´s quotation “The Bridge gathers to itself in its own way earth and sky, divinities and mortals”, and the bridge is a state of mind, a chronotope, a portal in time between past, present, and future. The methodological approach is based...

  19. Gust loading on streamlined bridge decks

    DEFF Research Database (Denmark)

    Larose, Guy; Mann, Jakob

    1998-01-01

    The current analytical description of the buffeting action of wind on long-span bridges is based on the strip assumption. However, recent experiments on closed-box girder bridge decks have shown that this assumption is not valid and is the source of an important part of the error margin...... of the analytical prediction methods. In this paper, an analytical model that departs from the strip assumption is used to describe the gust loading on a thin airfoil. A parallel is drawn between the analytical model and direct measurements of gust loading on motionless closed-box girder bridge decks. Empirical...

  20. Heavy Vehicles on Minor Highway Bridges

    DEFF Research Database (Denmark)

    Kirkegaard, Poul Henning; Nielsen, Søren R. K.; Enevoldsen, I.

    of heavier trucks moving at larger speeds, and partly because the authorities want to permit transportation of special heavy goods at a larger part of the road net. These needs will in many cases cause the strengthening of the bridges becomes necessary. In order to keep the expenses of such strengthening...... the results obtained using the numerical models given in details in "Heavy Vehicles on Minor Highway Bridges : dynamic modelling of vehicles and bridges". The models are established using a ordinary vehicle which consists of a 48 t Scania with a 3 axle tractor and a 3 axle trailer, joined in a flexible hinge...

  1. Noise measurements on proximity effect bridges

    International Nuclear Information System (INIS)

    Decker, S.K.; Mercereau, J.E.

    1975-01-01

    Audio frequency noise density measurements were performed on weakly superconducting proximity effect bridges on using a cooled transformer and room temperature low noise preamplifier. The noise temperature of the measuring system is approximately 4 0 K for a 0.9 Ω resistor. Noise density was measured as a function of bias current and temperature for the bridges. Excess noise above that expected from Johnson noise for a resistor equal to the dynamic resistance of the bridges was observed in the region near the critical current of the device. At high currents compared to the critical current, the noise density closely approaches that given by Johnson noise

  2. Building the Clinical Bridge: An Australian Success

    Directory of Open Access Journals (Sweden)

    Marianne Wallis

    2012-01-01

    Full Text Available Nursing effectiveness science includes primary, secondary, and translational, clinically focused research activities which aim to improve patient or client outcomes. It is imperative, for the successful conduct of a program of nursing effectiveness science, that a clinical bridge is established between academic and healthcare service facilities. An Australian example of the development of a robust clinical bridge through the use of jointly funded positions at the professorial level is outlined. In addition, an analysis of the practical application of Lewin’s model of change management and the contribution of both servant and transformational leadership styles to the bridge building process is provided.

  3. Family members' experiences with intensive care unit diaries when the patient does not survive.

    Science.gov (United States)

    Johansson, Maria; Wåhlin, Ingrid; Magnusson, Lennart; Runeson, Ingrid; Hanson, Elizabeth

    2018-03-01

    The aim of the study was to explore how family members experienced the use of a diary when a relative does not survive the stay in the intensive care unit (ICU). A qualitative method with a hermeneutic approach was used. Nine participants who read/wrote eight diaries in total were interviewed. The collected data were analysed using a hermeneutic technique inspired by Geanellos. The analysis revealed an overall theme 'the diary was experienced as a bridge connecting the past with the future', which was a metaphor referring to the temporal aspect where there was the period with the diary up until the patient's death and then the postbereavement period. The diary contributed to both a rational and emotional understanding of the death of the patient and disclosed glimmers of light that still existed before the illness deteriorated. Further, the diary bridged the space between family members themselves and between family and nursing staff. It helped to maintain a feeling of togetherness and engagement in the care of the patient which family members found comforting. Family members of nonsurvivors had a need to have the ICU time explained and expressed. The diary might work as a form of 'survival kit' to gain coherence and understanding; to meet their needs during the hospital stay; and, finally, to act as a bereavement support by processing the death of the patient. © 2017 Nordic College of Caring Science.

  4. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Science.gov (United States)

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  5. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Science.gov (United States)

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  6. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Science.gov (United States)

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  7. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Science.gov (United States)

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  8. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  9. Model predictive control for a dual active bridge inverter with a floating bridge

    OpenAIRE

    Chowdhury, Shajjad; Wheeler, Patrick W.; Gerada, C.; Patel, Chintan

    2016-01-01

    This paper presents a Model Predictive Control technique applied to a dual active bridge inverter where one of the bridges is floating. The proposed floating bridge topology eliminates the need for isolation transformer in a dual inverter system and therefore reduces the size, weight and losses in the system. To achieve multilevel output voltage waveforms the floating inverter DC link capacitor is charged to the half of the main DC link voltage. A finite-set Model Predictive Control technique...

  10. TMACS test procedure TP012: Panalarm software bridge

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date

  11. 33 CFR 118.80 - Lights on bascule bridges.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on bascule bridges. 118.80 Section 118.80 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.80 Lights on bascule bridges. (a) Lift span lights. Each lift span of...

  12. 49 CFR 236.766 - Locking, movable bridge.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  13. 33 CFR 118.140 - Painting bridge piers.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  14. 23 CFR 650.705 - Application for discretionary bridge funds.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  15. Inspection Based Evaluation of a Danish Road Bridge

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper it is shown how an inspection-based evaluation of a Danish road bridge may be performed using the BRIDGE1 and BRIDGE2 bridge management systems produced within the EC-supported research programme "Assessment of Performance and Optimal Strategies for Inspection and Maintenance...

  16. An efficient CMOS bridging fault simulator with SPICE accuracy

    NARCIS (Netherlands)

    Di, C.; Jess, J.A.G.

    1996-01-01

    This paper presents an alternative modeling and simulation method for CMOS bridging faults. The significance of the method is the introduction of a set of generic-bridge tables which characterize the bridged outputs for each bridge and a set of generic-cell tables which characterize how each cell

  17. Detection of salt bridges to lysines in solution in barnase

    DEFF Research Database (Denmark)

    Hansen, Poul Erik; Williamson, Michael P.; Hounslow, Andrea M.

    2013-01-01

    We show that salt bridges involving lysines can be detected by deuterium isotope effects on NMR chemical shifts of the sidechain amine. Lys27 in the ribonuclease barnase is salt bridged, and mutation of Arg69 to Lys retains a partially buried salt bridge. The salt bridges are functionally important....

  18. Two high-frequency mutual inductance bridges with high resolution

    NARCIS (Netherlands)

    Flokstra, Jakob; Gerritsma, G.J.; Kreuwel, H.J.M.; van der Marel, L.C.

    1980-01-01

    Two mutual inductance bridges are described for operation up to about 100 kHz. Special attention is paid to the sensitivity and resolution of the bridges. Both bridges can be used to measure variations of about 10 pH in the mutual inductance. The first bridge consists of passive elements only

  19. Bridge Over an Aging Population: Examining Longitudinal Relations Among Human Resource Management, Social Support, and Employee Outcomes Among Bridge Workers

    Science.gov (United States)

    Veth, Klaske N.; Van der Heijden, Beatrice I. J. M.; Korzilius, Hubert P. L. M.; De Lange, Annet H.; Emans, Ben J. M.

    2018-01-01

    This two-wave complete panel study aims to examine human resource management (HRM) bundles of practices in relation to social support [i.e., leader–member exchange (LMX), coworker exchange (CWX)] and employee outcomes (i.e., work engagement, employability, and health), within a context of workers aged 65+. Based upon the social exchange theory and the Job Demands-Resources (JD-R) framework, it was hypothesized that HRM bundles at Time 1 would increase bridge workers' outcomes at Time 2, and that this relationship would be mediated by perceptions of LMX and CWX at Time 2. Using a longitudinal design, hypotheses were tested in a unique sample of Dutch bridge employees (N = 228). Results of several structural equation modeling analyses revealed no significant associations between HRM bundles, and social support, moreover, no significant associations were found in relation to employee outcomes. However, the results of the best-fitting final model revealed the importance of the impact of social support on employee (65+) outcomes over time. PMID:29755386

  20. Bridge Over an Aging Population: Examining Longitudinal Relations Among Human Resource Management, Social Support, and Employee Outcomes Among Bridge Workers

    Directory of Open Access Journals (Sweden)

    Klaske N. Veth

    2018-04-01

    Full Text Available This two-wave complete panel study aims to examine human resource management (HRM bundles of practices in relation to social support [i.e., leader–member exchange (LMX, coworker exchange (CWX] and employee outcomes (i.e., work engagement, employability, and health, within a context of workers aged 65+. Based upon the social exchange theory and the Job Demands-Resources (JD-R framework, it was hypothesized that HRM bundles at Time 1 would increase bridge workers' outcomes at Time 2, and that this relationship would be mediated by perceptions of LMX and CWX at Time 2. Using a longitudinal design, hypotheses were tested in a unique sample of Dutch bridge employees (N = 228. Results of several structural equation modeling analyses revealed no significant associations between HRM bundles, and social support, moreover, no significant associations were found in relation to employee outcomes. However, the results of the best-fitting final model revealed the importance of the impact of social support on employee (65+ outcomes over time.

  1. Bridge Over an Aging Population: Examining Longitudinal Relations Among Human Resource Management, Social Support, and Employee Outcomes Among Bridge Workers.

    Science.gov (United States)

    Veth, Klaske N; Van der Heijden, Beatrice I J M; Korzilius, Hubert P L M; De Lange, Annet H; Emans, Ben J M

    2018-01-01

    This two-wave complete panel study aims to examine human resource management (HRM) bundles of practices in relation to social support [i.e., leader-member exchange (LMX), coworker exchange (CWX)] and employee outcomes (i.e., work engagement, employability, and health), within a context of workers aged 65+. Based upon the social exchange theory and the Job Demands-Resources (JD-R) framework, it was hypothesized that HRM bundles at Time 1 would increase bridge workers' outcomes at Time 2, and that this relationship would be mediated by perceptions of LMX and CWX at Time 2. Using a longitudinal design, hypotheses were tested in a unique sample of Dutch bridge employees ( N = 228). Results of several structural equation modeling analyses revealed no significant associations between HRM bundles, and social support, moreover, no significant associations were found in relation to employee outcomes. However, the results of the best-fitting final model revealed the importance of the impact of social support on employee (65+) outcomes over time.

  2. Behavior of micropiles in bridge bent applications.

    Science.gov (United States)

    2010-12-01

    This project concerned the behavior of micropiles under lateral loads. The North Carolina Department of Transportation was specifically interested in the use of micropiles to support bridge bents. In this configuration micropiles would be subjected t...

  3. Active Control of Long Bridges Using Flaps

    DEFF Research Database (Denmark)

    Hansen, H. I.; Thoft-Christensen, Palle

    The main problem in designing ultra-long span suspension bridges is flutter. A solution to this problem might be to introduce an active flap control system to increase the flutter wind velocity. The investigated flap control system consists of flaps integrated in the bridge girder so each flap...... is the streamlined part of the edge of the girder. Additional aerodynamic derivatives are shown for the flaps and it is shown how methods already developed can be used to estimate the flutter wind velocity for a bridge section with flaps. As an example, the flutter wind velocity is calculated for different flap...... configurations for a bridge section model by using aerodynamic derivatives for a flat plate. The example shows that different flap configurations can either increase or decrease the flutter wind velocity. for optimal flap configurations flutter will not occur....

  4. Active aerodynamic stabilisation of long suspension bridges

    DEFF Research Database (Denmark)

    Nissen, Henrik Ditlev; Sørensen, Paul Haase; Jannerup, Ole Erik

    2004-01-01

    The paper describes the addition of actively controlled appendages (flaps) attached along the length of the bridge deck to dampen wind-induced oscillations in long suppension bridges. A novel approach using control systems methods for the analysis of dynamic stability is presented. In order to make...... use of control analysis and design techniques, a linear model of the structural and aerodynamic motion around equilibriun is developed. The model is validated through comparison with finite element calculations and wind tunnel experimental data on the Great Belt East Bridge in Denmark. The developed...... active control scheme is local in that the flap control signal at a given longitudinal position along the bridge only depends on local motion measurements. The analysis makes use of the Nyquist stability criteria and an anlysis of the sensitivity function for stability analysis. The analysis shows...

  5. Assuring bridge safety and serviceability in Europe

    Science.gov (United States)

    2010-08-01

    U.S. engineers need advanced tools and protocols to better assess and assure safety and serviceability of bridges. The Federal Highway Administration, American Association of State Highway and Transportation Officials, and National Cooperative Highwa...

  6. Influence of Icing on Bridge Cable Aerodynamics

    DEFF Research Database (Denmark)

    Koss, Holger; Frej Henningsen, Jesper; Olsen, Idar

    2013-01-01

    In recent years the relevance of ice accretion for wind-induced vibration of structural bridge cables has been recognised and became a subject of research in bridge engineering. Full-scale monitoring and observation indicate that light precipitation at moderate low temperatures between zero and -5......°C may lead to large amplitude vibrations of bridge cables under wind action. For the prediction of aerodynamic instability quasi-steady models have been developed estimating the cable response magnitude based on structural properties and aerodynamic force coefficients for drag, lift and torsion...... forces of different bridge cables types. The experiments were conducted in a wind tunnel facility capable amongst others to simulate incloud icing conditions....

  7. Pilot testing of a hydraulic bridge exciter

    Directory of Open Access Journals (Sweden)

    Andersson Andreas

    2015-01-01

    Full Text Available This paper describes the development of a hydraulic bridge exciter and its first pilot testing on a full scale railway bridge in service. The exciter is based on a hydraulic load cylinder with a capacity of 50 kN and is intended for controlled dynamic loading up to at least 50 Hz. The load is applied from underneath the bridge, enabling testing while the railway line is in service. The system is shown to produce constant load amplitude even at resonance. The exciter is used to experimentally determine frequency response functions at all sensor locations, which serve as valuable input for model updating and verification. An FE-model of the case study bridge has been developed that is in good agreement with the experimental results.

  8. Deterioration and cost information for bridge management.

    Science.gov (United States)

    2012-05-01

    This study applies contract bid tabulations and elementlevel condition records to develop elementlevel actions, : costs for actions, transition probabilities for models of deterioration of bridge elements, and transition probabilities : for imp...

  9. Key Royale bridge five year evaluation.

    Science.gov (United States)

    2013-06-01

    This report describes the design, construction, instrumentation, and five-year evaluation of the Key Royale Bridge substructure. The primary focus was the evaluation of the implementation of highly reactive supplementary cementitious materials (SCM) ...

  10. Recessed floating pier caps for highway bridges.

    Science.gov (United States)

    1973-01-01

    Presented are alternate designs for two existing bridges in Virginia - one with steel beams and the other with prestressed concrete beams - whereby the pier caps are recessed within the depth of the longitudinal beams. The purpose of this recession i...

  11. Aesthetic coatings for concrete bridge components

    Science.gov (United States)

    Kriha, Brent R.

    This thesis evaluated the durability and aesthetic performance of coating systems for utilization in concrete bridge applications. The principle objectives of this thesis were: 1) Identify aesthetic coating systems appropriate for concrete bridge applications; 2) Evaluate the performance of the selected systems through a laboratory testing regimen; 3) Develop guidelines for coating selection, surface preparation, and application. A series of site visits to various bridges throughout the State of Wisconsin provided insight into the performance of common coating systems and allowed problematic structural details to be identified. To aid in the selection of appropriate coating systems, questionnaires were distributed to coating manufacturers, bridge contractors, and various DOT offices to identify high performing coating systems and best practices for surface preparation and application. These efforts supplemented a literature review investigating recent publications related to formulation, selection, surface preparation, application, and performance evaluation of coating materials.

  12. Improved bridge joint materials and design details.

    Science.gov (United States)

    2017-06-01

    Expansion joints accommodate bridge movements that result from factors such as thermal expansion and contraction, concrete shrinkage, creep effects, live loading, settlement of the foundation and substructure, and environmental stressors. Expansion j...

  13. Life-cycle assessment of Nebraska bridges.

    Science.gov (United States)

    2013-05-01

    Life-cycle cost analysis (LCCA) is a necessary component in bridge management systems (BMSs) for : assessing investment decisions and identifying the most cost-effective improvement alternatives. The : LCCA helps to identify the lowest cost alternati...

  14. Life cycle costs for Alaska bridges.

    Science.gov (United States)

    2014-08-01

    A study was implemented to assist the Alaska Department of Transportation and Public Facilities (ADOT&PF) with life cycle costs for : the Alaska Highway Bridge Inventory. The study consisted of two parts. Part 1 involved working with regional offices...

  15. Multimedia package for LRFD concrete bridge design.

    Science.gov (United States)

    2009-02-01

    This Project developed a Load and Resistance Factor Design (LRFD) multimedia package to provide a practical introduction and an in-depth understanding of the technological advances in the design of concrete bridges. This package can be used to train ...

  16. Eddy current testing device using unbalance bridge

    International Nuclear Information System (INIS)

    Hoshikawa, H.; Koido, J.; Ishibashi, Y.

    1976-01-01

    An easily readjustable unbalance bridge has been invented and in utilizing the same, an eddy current testing equipment excellent in suppression of the lift-off effect and high in the detection sensitivity has been developed

  17. ERA OF NEW TECHNOLOGIES FOR BRIDGES CONSTRUCTIONS

    Directory of Open Access Journals (Sweden)

    S. V. Klyuchnyk

    2010-03-01

    Full Text Available In this paper the possibilities of protection of bridge structures from corrosion by thermal spraying of aluminum or zinc, which provides the long-term protection (approximately 50 years, are presented.

  18. Allegheny County-Owned Bridges Points

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset shows the location of bridges owned by Allegheny County as centroids. If viewing this description on the Western Pennsylvania Regional Data Center’s...

  19. International Focus: Highlighting APPA Members Worldwide

    Science.gov (United States)

    Glazner, Steve, Comp.

    2011-01-01

    While most APPA member institutions are located in the United States and Canada, there are also 45 of member institutions located internationally--from Australia and New Zealand to Southeast Asia to the Middle East to Europe. This article focuses on four of its international members: (1) American University of Kuwait (AUK); (2) American University…

  20. The Members of the Agency (French Edition)

    International Nuclear Information System (INIS)

    2013-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.74) is Swaziland, which deposited its instrument of acceptance of the Statute on 15 February 2013. The Attachment hereto shows the dates on which the present 159 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  1. The Members of the Agency (Spanish Edition)

    International Nuclear Information System (INIS)

    2013-01-01

    The new Member since the last list of Member States was issued (INFCIRC/2/Rev.74) is Swaziland, which deposited its instrument of acceptance of the Statute on 15 February 2013. The Attachment hereto shows the dates on which the present 159 Member States deposited instruments of ratification or acceptance of the Statute with the depositary Government

  2. Identifying hidden sexual bridging communities in Chicago.

    Science.gov (United States)

    Youm, Yoosik; Mackesy-Amiti, Mary Ellen; Williams, Chyvette T; Ouellet, Lawrence J

    2009-07-01

    Bridge populations can play a central role in the spread of human immunodeficiency virus (HIV) by providing transmission links between higher and lower prevalence populations. While social network methods are well suited to the study of bridge populations, analyses tend to focus on dyads (i.e., risk between drug and/or sex partners) and ignore bridges between distinct subpopulations. This study takes initial steps toward moving the analysis of sexual network linkages beyond individual and risk group levels to a community level in which Chicago's 77 community areas are examined as subpopulations for the purpose of identifying potential bridging communities. Of particular interest are "hidden" bridging communities; that is, areas with above-average levels of sexual ties with other areas but whose below-average AIDS prevalence may hide their potential importance for HIV prevention. Data for this analysis came from the first wave of recruiting at the Chicago Sexual Acquisition and Transmission of HIV Cooperative Agreement Program site. Between August 2005 through October 2006, respondent-driven sampling was used to recruit users of heroin, cocaine, or methamphetamine, men who have sex with men regardless of drug use, the sex partners of these two groups, and sex partners of the sex partners. In this cross-sectional study of the sexual transmission of HIV, participants completed a network-focused computer-assisted self-administered interview, which included questions about the geographic locations of sexual contacts with up to six recent partners. Bridging scores for each area were determined using a matrix representing Chicago's 77 community areas and were assessed using two measures: non-redundant ties and flow betweenness. Bridging measures and acquired immunodeficiency syndrome (AIDS) case prevalence rates were plotted for each community area on charts representing four conditions: below-average bridging and AIDS prevalence, below-average bridging and above

  3. Thermal Bridge Effects in Walls Separating Rowhouses

    DEFF Research Database (Denmark)

    Rose, Jørgen

    1997-01-01

    In this report the thermal bridge effects at internal wall/roof junctions in rowhouses are evaluated. The analysis is performed using a numerical calculation programme, and different solutions are evaluated with respect to extra heat loss and internal surface temperatures.......In this report the thermal bridge effects at internal wall/roof junctions in rowhouses are evaluated. The analysis is performed using a numerical calculation programme, and different solutions are evaluated with respect to extra heat loss and internal surface temperatures....

  4. Bridging the Gap Between Theory and Practice

    OpenAIRE

    Roy H.M. Sembel

    2015-01-01

    Some concerns in the field of Business Management regarding the gap between theory and practice have been raised by practitioners and academicians. This keynote speech describes some lessons learned from the academic literature regarding this gap (whether the gap really exists, and if it exists, whether it needs to be bridged or closed, and how to bridge or close this gap), and shares the author's personal and professional experiences of living as both an academician and a practitioner. The m...

  5. Dynamic Response of a Floating Bridge Structure

    OpenAIRE

    Viuff, Thomas; Leira, Bernt Johan; Øiseth, Ole; Xiang, Xu

    2016-01-01

    A theoretical overview of the stochastic dynamic analysis of a floating bridge structure is presented. Emphasis is on the wave-induced response and the waves on the sea surface are idealized as a zero mean stationary Gaussian process. The first-order wave load processes are derived using linear potential theory and the structural idealization is based on the Finite Element Method. A frequency response calculation is presented for a simplified floating bridge structure example emphasising the ...

  6. Preliminary bridge design navigation tool for novices

    OpenAIRE

    Boulanger, Sylvie

    1997-01-01

    The motivation of the thesis comes from the frustrations of young engineers confronted with real design problems. The inspiration of the thesis evolved from observations of bridge designers and analyses of bridge design competitions. Not only do designers adopt more than one strategy during design, they rarely perform a fixed sequence of tasks. Not only do designers consider more than one criterion during design, their priorities shift during the determination of parameters. The choice of tas...

  7. Preliminary bridge design navigation tool for novices

    OpenAIRE

    Boulanger, Sylvie; Hirt, Manfred A.

    2008-01-01

    The motivation of the thesis comes from the frustrations of young engineers confronted with real design problems. The inspiration of the thesis evolved from observations of bridge designers and analyses of bridge design competitions. Not only do designers adopt more than one strategy during design, they rarely perform a fixed sequence of tasks. Not only do designers consider more than one criterion during design, their priorities shift during the determination of parameters. The choice of tas...

  8. Salt bridge interactions within the β2 integrin α7 helix mediate force-induced binding and shear resistance ability.

    Science.gov (United States)

    Zhang, Xiao; Li, Linda; Li, Ning; Shu, Xinyu; Zhou, Lüwen; Lü, Shouqin; Chen, Shenbao; Mao, Debin; Long, Mian

    2018-01-01

    The functional performance of the αI domain α 7 helix in β 2 integrin activation depends on the allostery of the α 7 helix, which axially slides down; therefore, it is critical to elucidate what factors regulate the allostery. In this study, we determined that there were two conservative salt bridge interaction pairs that constrain both the upper and bottom ends of the α 7 helix. Molecular dynamics (MD) simulations for three β 2 integrin members, lymphocyte function-associated antigen-1 (LFA-1; α L β 2 ), macrophage-1 antigen (Mac-1; α M β 2 ) and α x β 2 , indicated that the magnitude of the salt bridge interaction is related to the stability of the αI domain and the strength of the corresponding force-induced allostery. The disruption of the salt bridge interaction, especially with double mutations in both salt bridges, significantly reduced the force-induced allostery time for all three members. The effects of salt bridge interactions of the αI domain α 7 helix on β 2 integrin conformational stability and allostery were experimentally validated using Mac-1 constructs. The results demonstrated that salt bridge mutations did not alter the conformational state of Mac-1, but they did increase the force-induced ligand binding and shear resistance ability, which was consistent with MD simulations. This study offers new insight into the importance of salt bridge interaction constraints of the αI domain α 7 helix and external force for β 2 integrin function. © 2017 Federation of European Biochemical Societies.

  9. Surface-micromachined rotatable member having a low-contact-area hub

    Science.gov (United States)

    Rodgers, M. Steven; Sniegowski, Jeffry J.; Krygowski, Thomas W.

    2003-11-18

    A surface-micromachined rotatable member formed on a substrate and a method for manufacturing thereof are disclosed. The surface-micromachined rotatable member, which can be a gear or a rotary stage, has a central hub, and an annulus connected to the central hub by an overarching bridge. The hub includes a stationary axle support attached to the substrate and surrounding an axle. The axle is retained within the axle support with an air-gap spacing therebetween of generally 0.3 .mu.m or less. The rotatable member can be formed by alternately depositing and patterning layers of a semiconductor (e.g. polysilicon or a silicon-germanium alloy) and a sacrificial material and then removing the sacrificial material, at least in part. The present invention has applications for forming micromechanical or microelectromechanical devices requiring lower actuation forces, and providing improved reliability.

  10. Surface--micromachined rotatable member having a low-contact-area hub

    Science.gov (United States)

    Rodgers, M. Steven; Sniegowski, Jeffry J.

    2002-01-01

    A surface-micromachined rotatable member formed on a substrate and a method for manufacturing thereof are disclosed. The surface-micromachined rotatable member, which can be a gear or a rotary stage, has a central hub, and an annulus connected to the central hub by an overarching bridge. The hub includes a stationary axle support attached to the substrate and surrounding an axle. The axle is retained within the axle support with an air-gap spacing therebetween of generally 0.3 .mu.m or less. The rotatable member can be formed by alternately depositing and patterning layers of a semiconductor (e.g. polysilicon or a silicon-germanium alloy) and a sacrificial material and then removing the sacrificial material, at least in part. The present invention has applications for forming micromechanical or microelectromechanical devices requiring lower actuation forces, and providing improved reliability.

  11. Wind tunnel test of musi VI bridge

    Science.gov (United States)

    Permata, Robby; Andika, Matza Gusto; Syariefatunnisa, Risdhiawan, Eri; Hermawan, Budi; Noordiana, Indra

    2017-11-01

    Musi VI Bridge is planned to cross the Musi River in Palembang City, South Sumatera Province, Indonesia. The main span is a steel arch type with 200 m length and side span length is 75 m. Finite element analysis results showed that the bridge has frequency ratio for torsional and heaving mode (torsional frequency/heaving frequency)=1.14. This close to unity value rises concern about aerodynamic behaviour and stability of the bridge deck under wind loading. Sectional static and free vibration wind tunnel test were performed to clarify this phenomena in B2TA3 facility in Serpong, Indonesia. The test followed the draft of Guide of Wind Tunnel Test for Bridges developed by Indonesian Ministry of Public Works. Results from wind tunnel testing show that the bridge is safe from flutter instability and no coupled motion vibration observed. Therefore, low value of frequency ratio has no effect to aerodynamic behaviour of the bridge deck. Vortex-induced vibration in heaving mode occurred in relatively low wind velocity with permissible maximum amplitude value.

  12. Members of the LHC Resources Review Boards

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Photo 01: Members of the LHCRRB visiting Point 2, hosting the ALICE experiment From l. to r. : W. Korda, Head of the VIP Office; P. Rimmer, CERN public relations, J. Seed, Member of the LHCRRB, J.-P. Revol, ALICE CERN Team Leader; J. Bartke, Member of the LHCRRB; F. Suransky, Member of the LHCRRB; J. Schukraft, Spokesperson, ALICE experiment and S. Molinari, VIP Office. Photo 02: Members of the LHC Resources Review Boards visiting the ALICE magnet at Point 2. L. to. r.: O. Dines-Hansen, H. Boggild, S. Irgens-Jensens, H.A. Gustafsson Photo 03: Members of the LHCRRB visiting Point 2, hosting the ALICE experiment From l. t to r.: J.Richter, Member of the LHCRRB; H. Gutbrod, Deputy Spokesperson, ALICE experiment; G. Paic, ALICE experiment; D. Muller, Member of the LHCRRB; P. Brau-Munzinger, ALICE experiment; R. Santo, Member of the LHCRRB, A. Van Rijn, Member of the LHCRRB; J. Engelen, Member of the LHCRRB.

  13. Indium-bridged [1]ferrocenophanes.

    Science.gov (United States)

    Bagh, Bidraha; Sadeh, Saeid; Green, Jennifer C; Müller, Jens

    2014-02-17

    Indium-bridged [1]ferrocenophanes ([1]FCPs) and [1.1]ferrocenophanes ([1.1]FCPs) were synthesized from dilithioferrocene species and indium dichlorides. The reaction of Li2fc⋅tmeda (fc = (H4C5)2Fe) and (Mamx)InCl2 (Mamx = 6-(Me2NCH2)-2,4-tBu2C6H2) gave a mixture of the [1]FCP (Mamx)Infc (4(1)), the [1.1]FCP [(Mamx)Infc]2 (4(2)), and oligomers [(Mamx)Infc]n (4(n)). In a similar reaction, employing the enantiomerically pure, planar-chiral (Sp,Sp)-1,1'-dibromo-2,2'-diisopropylferrocene (1) as a precursor for the dilithioferrocene derivative Li2fc(iPr2), equipped with two iPr groups in the α position, gave the inda[1]ferrocenophane 5(1) [(Mamx)Infc(iPr2)] selectively. Species 5(1) underwent ring-opening polymerization to give the polymer 5(n). The reaction between Li2fc(iPr2) and Ar'InCl2 (Ar' = 2-(Me2NCH2)C6H4) gave an inseparable mixture of the [1]FCP Ar'Infc(iPr2) (6(1)) and the [1.1]FCP [Ar'Infc(iPr2)]2 (6(2)). Hydrogenolysis reactions (BP86/TZ2P) of the four inda[1]ferrocenophanes revealed that the structurally most distorted species (5(1)) is also the most strained [1]FCP. Copyright © 2014 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  14. Bridge employment after early retirement: a bridge to better postretirement well-being of older adults?

    NARCIS (Netherlands)

    Dingemans, E.

    2012-01-01

    Using a retirement arrangement does not necessarily mean that people retire fulltime. The phenomenon of bridge employment, already studied in the US, becomes increasingly popular among older adults in the Netherlands. The question is to what extent bridge employment can be beneficial for well-being

  15. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  16. Role of multiprotein bridging factor 1 in archaea: bridging the domains?

    NARCIS (Netherlands)

    Koning, de B.; Blombach, F.; Wu Hao,; Brouns, S.J.J.; Oost, van der J.

    2009-01-01

    MBF1 (multiprotein bridging factor 1) is a highly conserved protein in archaea and eukaryotes. It was originally identified as a mediator of the eukaryotic transcription regulator BmFTZ-F1 (Bombyx mori regulator of fushi tarazu). MBF1 was demonstrated to enhance transcription by forming a bridge

  17. 75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Science.gov (United States)

    2010-10-07

    ... INFORMATION CONTACT: Ms. Ann Shemaka, Office of Bridge Technology, HIBT-30, (202) 366-1575, or Mr. Thomas Everett, Office of Bridge Technology, HIBT-30, (202) 366-4675, Federal Highway Administration, 1200 New... is categorized by the following material types, which are identified in the NBI: steel, concrete, pre...

  18. 77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Science.gov (United States)

    2012-08-31

    ... INFORMATION CONTACT: Ms. Ann Shemaka, Office of Bridge Technology, (202) 366-1575, or via email at [email protected] or Mr. Thomas Everett, Office of Bridge Technology, (202) 366-4675, or via email at thomas... the NBI: steel, concrete, pre-stressed concrete, and other. The category ``other'' includes wood...

  19. 76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Science.gov (United States)

    2011-09-06

    ... INFORMATION CONTACT: Ms. Ann Shemaka, Office of Bridge Technology, HIBT-30, (202) 366-1575, or Mr. Thomas Everett, Office of Bridge Technology, HIBT-30, (202) 366-4675, Federal Highway Administration, 1200 New... is categorized by the following material types, which are identified in the NBI: steel, concrete, pre...

  20. Estimating bridge stiffness using a forced-vibration technique for timber bridge health monitoring

    Science.gov (United States)

    James P. Wacker; Xiping Wang; Brian Brashaw; Robert J. Ross

    2006-01-01

    This paper describes an effort to refine a global dynamic testing technique for evaluating the overall stiffness of timber bridge superstructures. A forced vibration method was used to measure the frequency response of several simple-span, sawn timber beam (with plank deck) bridges located in St. Louis County, Minnesota. Static load deflections were also measured to...

  1. Bridge and steel structures. History and vision on bridge erection; Kyoryo kokozobutsu. Kasetsu gijutsu no shorai

    Energy Technology Data Exchange (ETDEWEB)

    Mukai, S.; Hayashi, T. [Sumitomo Heavy Industries, Ltd., Tokyo (Japan)

    1998-08-20

    This paper describes the progress of bridge erection technology. It introduces the results of cable erection, rotated/extruded erection, and cantilever erection. The cable erection is a multi point suspension erection using cables. For the rotated/extruded erection, the monolithic construction is conducted on a working yard set in a right angle to the construction position, and the horizontal beams of the bridge piers (corbel girders) are constructed by the rotated method using a slewing base incorporated around the bridge piers at one side. For the construction of stiffening girders of Innoshima-ohashi Bridge of Honshu-Shikoku Joint Bridge in 1978, trussed face bar blocks were extruded from the main tower in order using a travel crane. For the suspension bridges and cable stayed bridges, main towers were erected using various types of cranes. The erection of Tamashima-ohashi Bridge with a weight of 500 ton using an offshore floating crane is introduced as a large block method. Analysis methods and measurement techniques at the site are used in order to analyze the shape in each step under the erection and to ensure the accurate final complete shape. Reduction of the construction cost, improvement of erection technology, and technology development for large-scale projects are subjects in the future. 22 refs., 8 figs., 1 tab.

  2. Blasting detonators incorporating semiconductor bridge technology

    Energy Technology Data Exchange (ETDEWEB)

    Bickes, R.W. Jr.

    1994-05-01

    The enormity of the coal mine and extraction industries in Russia and the obvious need in both Russia and the US for cost savings and enhanced safety in those industries suggests that joint studies and research would be of mutual benefit. The author suggests that mine sites and well platforms in Russia offer an excellent opportunity for the testing of Sandia`s precise time-delay semiconductor bridge detonators, with the potential for commercialization of the detonators for Russian and other world markets by both US and Russian companies. Sandia`s semiconductor bridge is generating interest among the blasting, mining and perforation industries. The semiconductor bridge is approximately 100 microns long, 380 microns wide and 2 microns thick. The input energy required for semiconductor bridge ignition is one-tenth the energy required for conventional bridgewire devices. Because semiconductor bridge processing is compatible with other microcircuit processing, timing and logic circuits can be incorporated onto the chip with the bridge. These circuits can provide for the precise timing demanded for cast effecting blasting. Indeed tests by Martin Marietta and computer studies by Sandia have shown that such precise timing provides for more uniform rock fragmentation, less fly rock, reduce4d ground shock, fewer ground contaminants and less dust. Cost studies have revealed that the use of precisely timed semiconductor bridges can provide a savings of $200,000 per site per year. In addition to Russia`s vast mineral resources, the Russian Mining Institute outside Moscow has had significant programs in rock fragmentation for many years. He anticipated that collaborative studies by the Institute and Sandia`s modellers would be a valuable resource for field studies.

  3. New Quality Control Algorithm Based on GNSS Sensing Data for a Bridge Health Monitoring System

    Directory of Open Access Journals (Sweden)

    Jae Kang Lee

    2016-05-01

    Full Text Available This research introduces an improvement plan for the reliability of Global Navigation Satellite System (GNSS positioning solutions. It should be considered the most suitable methodology in terms of the adjustment and positioning of GNSS in order to maximize the utilization of GNSS applications. Though various studies have been conducted with regards to Bridge Health Monitoring System (BHMS based on GNSS, the outliers which depend on the signal reception environment could not be considered until now. Since these outliers may be connected to GNSS data collected from major bridge members, which can reduce the reliability of a whole monitoring system through the delivery of false information, they should be detected and eliminated in the previous adjustment stage. In this investigation, the Detection, Identification, Adaptation (DIA technique was applied and implemented through an algorithm. Moreover, it can be directly applied to GNSS data collected from long span cable stayed bridges and most of outliers were efficiently detected and eliminated simultaneously. By these effects, the reliability of GNSS should be enormously improved. Improvement on GNSS positioning accuracy is directly linked to the safety of bridges itself, and at the same time, the reliability of monitoring systems in terms of the system operation can also be increased.

  4. Coupling vibration research on Vehicle-bridge system

    Science.gov (United States)

    Zhou, Jiguo; Wang, Guihua

    2018-01-01

    The vehicle-bridge coupling system forms when vehicle running on a bridge. It will generate a relatively large influence on the driving comfort and driving safe when the vibration of the vehicle is bigger. A three-dimensional vehicle-bridge system with biaxial seven degrees of freedom has been establish in this paper based on finite numerical simulation. Adopting the finite element transient numerical simulation to realize the numerical simulation of vehicle-bridge system coupling vibration. Then, analyze the dynamic response of vehicle and bridge while different numbers of vehicles running on the bridge. Got the variation rule of vertical vibration of car body and bridge, and that of the contact force between the wheel and bridge deck. The research results have a reference value for the analysis about the vehicle running on a large-span cabled bridge.

  5. Precast Pearl-Chain concrete arch bridges

    DEFF Research Database (Denmark)

    Halding, Philip Skov; Hertz, Kristian Dahl; Schmidt, Jacob Wittrup

    2015-01-01

    A Pearl-Chain Bridge is a closed-spandrel arch bridge consisting of a number of straight pre-fabricated so called Super-Light Deck elements put together in an arch shape by post-tensioning cables. Several Pearl-Chain arches can be positioned adjacent to each other by a crane to achieve a bridge...... of a desired width. On top of the arch is a filling material to level out the surface of the above road. The filling only transfers vertical loads to the arch. The geometry and material properties of Super-Light Decks are presented, and we refer to several fullscale tests of Pearl-Chain arches where...... the technology was used. We also study other important components and details in the Pearl-Chain Bridge concept and review the effects of different types of loads. A theoretical case study of a circular 30 m span Pearl-Chain Bridge is presented showing the influence of a number of parameters: The number of post...

  6. A probabilistic bridge safety evaluation against floods.

    Science.gov (United States)

    Liao, Kuo-Wei; Muto, Yasunori; Chen, Wei-Lun; Wu, Bang-Ho

    2016-01-01

    To further capture the influences of uncertain factors on river bridge safety evaluation, a probabilistic approach is adopted. Because this is a systematic and nonlinear problem, MPP-based reliability analyses are not suitable. A sampling approach such as a Monte Carlo simulation (MCS) or importance sampling is often adopted. To enhance the efficiency of the sampling approach, this study utilizes Bayesian least squares support vector machines to construct a response surface followed by an MCS, providing a more precise safety index. Although there are several factors impacting the flood-resistant reliability of a bridge, previous experiences and studies show that the reliability of the bridge itself plays a key role. Thus, the goal of this study is to analyze the system reliability of a selected bridge that includes five limit states. The random variables considered here include the water surface elevation, water velocity, local scour depth, soil property and wind load. Because the first three variables are deeply affected by river hydraulics, a probabilistic HEC-RAS-based simulation is performed to capture the uncertainties in those random variables. The accuracy and variation of our solutions are confirmed by a direct MCS to ensure the applicability of the proposed approach. The results of a numerical example indicate that the proposed approach can efficiently provide an accurate bridge safety evaluation and maintain satisfactory variation.

  7. Nonlinear seismic analysis of continuous RC bridge

    Directory of Open Access Journals (Sweden)

    Čokić Miloš M.

    2017-01-01

    Full Text Available Nonlinear static analysis, known as a pushover method (NSPA is oftenly used to study the behaviour of a bridge structure under the seismic action. It is shown that the Equivalent Linearization Method - ELM, recommended in FEMA 440, is appropriate for the response analysis of the bridge columns, with different geometric characteristics, quantity and distribution of steel reinforcement. The subject of analysis is a bridge structure with a carriageway plate - a continuous beam with three spans, with the 24 + 40 + 24 m range. Main girder is made of prestressed concrete and it has a box cross section of a constant height. It is important to study the behaviour, not only in the transverse, but also in the longitudinal direction of the bridge axis, when analysing the bridge columns exposed to horizontal seismic actions. The columns were designed according to EN1992, parts 1 and 2. Seismic action analysis is conducted according to EN 1998: 2004 standard. Response spectrum type 1, for the ground type B, was applied and the analysis also includes 20% of traffic load. The analysis includes the values of columns displacement and ductility. To describe the behaviour of elements under the earthquake action in both - longitudinal and transverse direction, pushover curves were formed.

  8. Using rotating liquid bridges as accelerometers

    Energy Technology Data Exchange (ETDEWEB)

    Montanero, J.M. [Universidad de Extremadura, Badajoz (Spain). Dept. de Electronica e Ingenieria Electromecanica; Cabezas, G.; Acero, J.; Zayas, F.

    1999-07-01

    Liquid bridges have recently been proposed as fluid accelerometers that could be used to measure very small inertial forces under microgravity conditions [Meseguer et al., microgravity sci. technol. IX/2 (1996)]. The essential idea is to infer the values of such inertial forces from the liquid bridge interface contour, whose shape obviously depends on the values of such forces (apart from the bridge volume and the geometry of the supporting disks). Following a similar procedure, in this paper we explore the use of rotating axisymmetric liquid bridges to measure the residual axial gravity and the rotation rate of the liquid bridge regarded as a solid body. In light off the difficulties involved in performing experiments on Earth, the role of empirical data is played by an accurate numerical solution of the Young-Laplace equation. The values of both the axial gravity and angular speed are obtained by fitting the approximate analytical expressions derived in this paper to the numerical solution of the Young-Laplace equation. The comparison between the predicted and actual values of the variables of interest shows a satisfactory agreement, supporting the suitability of the procedure. (orig.)

  9. Finding Street Gang Members on Twitter

    OpenAIRE

    Balasuriya, Lakshika; Wijeratne, Sanjaya; Doran, Derek; Sheth, Amit

    2016-01-01

    Most street gang members use Twitter to intimidate others, to present outrageous images and statements to the world, and to share recent illegal activities. Their tweets may thus be useful to law enforcement agencies to discover clues about recent crimes or to anticipate ones that may occur. Finding these posts, however, requires a method to discover gang member Twitter profiles. This is a challenging task since gang members represent a very small population of the 320 million Twitter users. ...

  10. Suspension Bridge Flutter for Girder with Separate Control Flaps

    DEFF Research Database (Denmark)

    Huynh, T.; Thoft-Christensen, Palle

    Active vibration control of long span suspension bridge flutter using separated control flaps (SFSC) has shown to increase effectively the critical wind speed of bridges. In this paper, an SFSC calculation based on modal equations of the vertical and torsional motions of the bridge girder including...... the flaps is presented. The length of the flaps attached to the girder, the flap configuration and the flap rotational angles are parameters used to increase the critical wind speed of the bridge. To illustrate the theory a numerical example is shown for a suspension bridge of 1000m+2500m+1000m span based...... on the Great Belt Bridge streamlined girder....

  11. Vehicle - Bridge interaction, comparison of two computing models

    Science.gov (United States)

    Melcer, Jozef; Kuchárová, Daniela

    2017-07-01

    The paper presents the calculation of the bridge response on the effect of moving vehicle moves along the bridge with various velocities. The multi-body plane computing model of vehicle is adopted. The bridge computing models are created in two variants. One computing model represents the bridge as the Bernoulli-Euler beam with continuously distributed mass and the second one represents the bridge as the lumped mass model with 1 degrees of freedom. The mid-span bridge dynamic deflections are calculated for both computing models. The results are mutually compared and quantitative evaluated.

  12. Microwave Josephson generation in thin film superconducting bridges

    International Nuclear Information System (INIS)

    Gubankov, V.N.; Koshelets, V.P.; Ovsyannikov, G.A.

    1975-01-01

    Thin-film bridges have some advantage over other types of superconducting weak links: good definition of electromagnetic parameters and of weak region geometry. Up to now Josephson properties of bridges have been investigated by using indirect methods (the effect of magnetic field on the critical current I 0 , the bridge behavior in a microwave field, etc.). Direct experimental observation of Josephson radiation from autonomous thin film bridges is reported. Microwave radiation in tin bridges of 'variable' thickness has been investigated where the thickness of the film forming the bridge is far less than the thickness of the bank films. (Auth.)

  13. Evaluating the life cycle environmental impact of short span bridges

    DEFF Research Database (Denmark)

    Du, Guangli; Pettersson, Lars; Karoumi, Raid

    2016-01-01

    impact of the construction sector. Life cycle assessment (LCA) is a systematic method for assessing the environmental impact of products and systems, but its application in bridges is scarce. In Swede, most of the bridges are short spans and the type of concrete slab-frame bridge (CFB) accounts...... for a large share. Soil steel composite bridge (SSCB) is a functional equivalent solution for CFB. In order to mitigate the environmental burdens of short span bridges, this paper performed a comparative LCA study between these two types of bridge. The results indicate that the initial material consumption...

  14. GaggleBridge: collaborative data analysis.

    Science.gov (United States)

    Battke, Florian; Symons, Stephan; Herbig, Alexander; Nieselt, Kay

    2011-09-15

    Tools aiding in collaborative data analysis are becoming ever more important as researchers work together over long distances. We present an extension to the Gaggle framework, which has been widely adopted as a tool to enable data exchange between different analysis programs on one computer. Our program, GaggleBridge, transparently extends this functionality to allow data exchange between Gaggle users at different geographic locations using network communication. GaggleBridge can automatically set up SSH tunnels to traverse firewalls while adding some security features to the Gaggle communication. GaggleBridge is available as open-source software implemented in the Java language at http://it.inf.uni-tuebingen.de/gb. florian.battke@uni-tuebingen.de Supplementary data are available at Bioinformatics online.

  15. Assessment of the Reliability of Concrete Bridges

    DEFF Research Database (Denmark)

    Middleton, C. R.; Thoft-Christensen, Palle

    Although there has been a considerable amount of research into different aspects of concrete bridge reliability, it has still not been widely adopted in professional practice other than in the development and calibration of codes. This situation appears to be changing as there has been a signific......Although there has been a considerable amount of research into different aspects of concrete bridge reliability, it has still not been widely adopted in professional practice other than in the development and calibration of codes. This situation appears to be changing as there has been...... adopted to assist in achieving this goal. Rather than review the specific research on this subject this paper examines a number of key issues related to the practical application of reliability analysis to the assessment of concrete bridges....

  16. Bridge monitoring by interferometric deformation sensors

    Science.gov (United States)

    Inaudi, Daniele; Vurpillot, Samuel; Casanova, Nicoletta

    1996-09-01

    In many concrete bridges, the deformations are the most relevant parameter to be monitored in both short and long- terms. Strain monitoring gives only local information about the material behavior and too many such sensors would therefore be necessary to gain a complete understanding of the bridge behavior. We have found that fiber optic deformation sensors, with measurement bases of the order of one to a few meters, can give useful information both during the first days after concrete pouring and in the long term. In a first phase it is possible to monitor the thermal expansion due to the exothermic setting reaction and successively the thermal and drying shrinkages. Thanks to the long sensor basis, the detection of a crack traverse to the measurement region becomes probable and the evolution of cracks can therefore be followed with a reduced number of sensors. In the long-term it is possible to measure the geometric deformations and therefore the creeping of the bridge under static loads, especially under its own weight. In the past two years, our laboratory has installed hundreds of fiber optic deformation sensors in more than five concrete, composite steel-concrete, refurbished and enlarged bridges (road, highway and railway bridges). The measuring technique relies on low-coherence interferometry and offers a resolution down to a few microns even for long-term measurements. This contribution briefly discusses the measurement technique and then focuses on the development of a reliable sensor for direct concrete embedding and on the experimental results obtained on these bridges.

  17. Extracorporeal Life Support Bridge to Ventricular Assist Device: The Double Bridge Strategy.

    Science.gov (United States)

    Marasco, Silvana F; Lo, Casey; Murphy, Deirdre; Summerhayes, Robyn; Quayle, Margaret; Zimmet, Adam; Bailey, Michael

    2016-01-01

    In patients requiring left ventricular assist device (LVAD) support, it can be difficult to ascertain suitability for long-term mechanical support with LVAD and eventual transplantation. LVAD implantation in a shocked patient is associated with increased morbidity and mortality. Interest is growing in the utilization of extracorporeal life support (ECLS) as a bridge-to-bridge support for these critically unwell patients. Here, we reviewed our experience with ECLS double bridging. We hypothesized that ECLS double bridging would stabilize end-organ dysfunction and reduce ventricular assist device (VAD) implant perioperative mortality. We conducted a retrospective review of prospectively collected data for 58 consecutive patients implanted with a continuous-flow LVAD between January 2010 and December 2013 at The Alfred Hospital, Melbourne, Victoria, Australia. Twenty-three patients required ECLS support pre-LVAD while 35 patients underwent LVAD implantation without an ECLS bridge. Preoperative morbidity in the ECLS bridge group was reflected by increased postoperative intensive care duration, blood loss, blood product use, and postoperative renal failure, but without negative impact upon survival when compared with the no ECLS group. ECLS stabilization improved end-organ function pre-VAD implant with significant improvements in hepatic and renal dysfunction. This series demonstrates that the use of ECLS bridge to VAD stabilizes end-organ dysfunction and reduces VAD implant perioperative mortality from that traditionally reported in these "crash and burn" patients. Copyright © 2015 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  18. Dragon bridge - the world largest dragon-shaped (ARCH steel bridge as element of smart city

    Directory of Open Access Journals (Sweden)

    Chinh Luong Minh

    2016-01-01

    Full Text Available Dragon Bridge - The world’s largest dragon-shaped steel bridge, with an installation cost of $85 million USD, features 6 lanes for two separate directions, 666 meters of undulating steel in the shape of a dragon in the Ly Dynasty, the symbol of prosperity in Vietnamese culture. This unique and beautifully lit bridge, which also breathes fire and sprays water. It’s the purposeful integration of the lighting hardware articulates the dragon’s form, and the fire-breathing dragon head. This project transcends the notion of monumental bridge with dynamic colour-changing lighting, creating an iconic sculpture in the skyline that is both reverent and whimsical. The signature feature of the bridge was the massive undulating support structure resembling a dragon flying over the river. The dragon is prominent in Vietnamese culture as a symbol of power and nobility. Dragon Bridge stands out as a model of innovation. It has received worldwide attention in the design community and from the global media for its unique arch support system. Dragon Bridge serves as an example of how aesthetic quality of a design can serve cultural, economic and functional purposes. The article presents design solutions of the object and the evaluation of the technical condition before putting the facility into service.

  19. Structural bridging network position is associated with HIV status in a younger Black men who have sex with men epidemic.

    Science.gov (United States)

    Shah, Nirav S; Iveniuk, James; Muth, Stephen Q; Michaels, Stuart; Jose, Jo-Anne; Laumann, Edward O; Schneider, John A

    2014-02-01

    Younger Black men who have sex with men (BMSM) ages 16-29 have the highest rates of HIV in the United States. Despite increased attention to social and sexual networks as a framework for biomedical intervention, the role of measured network positions, such as bridging and their relationship to HIV risk has received limited attention. A network sample (N = 620) of BMSM respondents (N = 154) and their MSM and transgendered person network members (N = 466) was generated through respondent driven sampling of BMSM and elicitation of their personal networks. Bridging status of each network member was determined by a constraint measure and was used to assess the relationship between this bridging and unprotected anal intercourse (UAI), sex-drug use (SDU), group sex (GS) and HIV status within the network in South Chicago. Low, moderate and high bridging was observed in 411 (66.8 %), 81 (13.2 %) and 123 (20.0 %) of the network. In addition to age and having sex with men only, moderate and high levels of bridging were associated with HIV status (aOR 3.19; 95 % CI 1.58-6.45 and aOR 3.83; 95 % CI 1.23-11.95, respectively). Risk behaviors observed including UAS, GS, and SDU were not associated with HIV status, however, they clustered together in their associations with one another. Bridging network position but not risk behavior was associated with HIV status in this network sample of younger BMSM. Socio-structural features such as position within the network may be important when implementing effective HIV prevention interventions in younger BMSM populations.

  20. Bridging Real and Virtual: A Spiritual Challenge

    Directory of Open Access Journals (Sweden)

    Heim, Michael R.

    2017-05-01

    Full Text Available The question of how to bridge virtuality and reality intensified in 2016 with the release of several consumer products. The article begins by reviewing two anxieties about virtual reality raised at a 1999 conference. To address these anxieties, the paper draws on post-Jungian archetypal psychology (James Hillman, Thomas Moore and the retrieval of Renaissance theology (Marsilio Ficino. Two experiences with Samsung Gear VR then illustrate how classic archetypal elements can contribute to active procedures for bridging the virtual and the real.

  1. A Bridge Deflection Monitoring with GPS

    Science.gov (United States)

    Figurski, M.; Gałuszkiewicz, M.; Wrona, M.

    2007-01-01

    This paper introduces results of investigation carried on by The Applied Geomatics Section in Military University of Technology. Research includes possibilities of monitoring dynamic behavior of a bridge using high rate GPS data. Whole event was executed with collaboration of The Road and Bridge Management and The Warsaw Geodesy Company. Interdisciplinary approach with this project allows authors to get reliable information about investigating constructions and their respond for true traffic loading detected by GPS receivers. Way of compute data and used software (TRACK) are also shown in this paper.

  2. Experiments in a floating water bridge

    Science.gov (United States)

    Woisetschläger, Jakob; Gatterer, Karl; Fuchs, Elmar C.

    2010-01-01

    In a high-voltage direct-current experiment, a watery connection formed between two beakers filled with deionized water, giving the impression of a `floating water bridge'. Having a few millimeters diameter and up to 2.5 cm length, this watery connection reveals a number of interesting phenomena currently discussed in water science. Focusing on optical measurement techniques, the flow through the bridge was visualized and data were recorded such as flow velocity and directions, heat production, density fluctuations, pH values, drag force and mass transfer. To provide a better understanding of the basic phenomena involved the discussion references related literature.

  3. Dynamics of the floating water bridge

    International Nuclear Information System (INIS)

    Fuchs, Elmar C; Gatterer, Karl; Holler, Gert; Woisetschlaeger, Jakob

    2008-01-01

    When high voltage is applied to distilled water filled into two beakers close to each other, a water connection forms spontaneously, giving the impression of a floating water bridge (Fuchs et al 2007 J. Phys. D: Appl. Phys. 40 6112-4). This phenomenon is of special interest, since it comprises a number of phenomena currently tackled in modern water science. The build-up mechanism, the chemical properties and the dynamics of this bridge as well as related additional phenomena are presented and discussed

  4. V. Tormis: "Bridge of Song / Brian Hunt

    Index Scriptorium Estoniae

    Hunt, Brian

    1997-01-01

    Uuest heliplaadist "V. Tormis: "Bridge of Song" - Bridge of Song; Singing aboard ship; Brides Farewell; Kihnu Island Wedding Songs; 17 Estonian Wedding Songs; Three Estonian Game Songs; Four Estonian Lullabies. Estonian Radio Choir / Toomas Kapten. Finlandia 4509 96937-2; 56:52 DDD; "People of Kalevala" - God protect us from war; Vespian Winter; Eagle Flew From the North East; Plague Memory; Vainamoinen's Words of Wisdom; The Seventeenth Rune of Kalevala. National Male Choir of Estonia. Finlandia 0630 12245-2; 56:52 DDD

  5. Germanium-overcoated niobium Dayem bridges

    International Nuclear Information System (INIS)

    Holdeman, L.B.; Peters, P.N.

    1976-01-01

    Overcoating constriction microbridges with semiconducting germanium provides additional thermal conductivity at liquid-helium temperatures to reduce the effects of self-heating in these Josephson junctions. Microwave-induced steps were observed in the I-V characteristics of an overcoated Dayem bridge fabricated in a 15-nm-thick niobium film; at 4.2 K (T/sub c/-T=2.6 K), at least 20 steps could be counted. No steps were observed in the I-V characteristics of the bridge prior to overcoating. In addition, the germanium overcoat can protect against electrical disturbances at room temperature

  6. 7 CFR 1425.14 - Member business.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Member business. 1425.14 Section 1425.14 Agriculture... business. (a) At least 50 percent of a crop of an authorized commodity acquired by, or delivered to, a CMA... not be considered in determining the volume of member or nonmember business. ...

  7. Evaluation of damping property of long-span prestressed concrete cable-stayed bridges; Chodai PC shachokyo no gensui tokusei ni kansuru kosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Yamanobe, S.; Niihara, Y.; Minami, H.; Kono, T. [Kajima Corp., Tokyo (Japan)

    1999-09-30

    As to the dynamic design in the antiseismic design of PC cable-stayed bridges, evaluation of damping is important. Since it is difficult to evaluate damping property theoretically and analytically, a lot of studies have not been made about how to set up damping coefficients. In this study, using analytical models of existing long-span PC cable-stayed bridges, to clarify causes of damping of long-span PC cable-stayed bridge, the rate of strain energy in each member was examined. Equivalent damping coefficients of each member, effects of friction in movable bearing, and effects of basically radiational damping were studied. The correspondence with the results of the vibration experiments conventionally made were studied. (translated by NEDO)

  8. Bridging the Gap between Climate Research and Policy

    Science.gov (United States)

    Weiss, M.; Lambert, K. F.; Buonocore, J.; Driscoll, C. T.

    2016-12-01

    The weak link between science and policy jeopardizes the wellbeing of people and the planet. Climate change is a pressing example of this disconnect. Policies are not keeping pace with the best of our knowledge from climate change research. We are working to bridge the science-policy divide and advance climate solutions by focusing on the positive health, ecosystem, and economic benefits of policy action. In 2013, we brought together an interdisciplinary team to estimate the co-benefits of U.S. power plant carbon standards for air quality and health, plus the economic value of the benefits. The results demonstrate that strong carbon standards with flexible compliance options can change the power sector, yielding substantial air quality and health benefits nationwide. The results also show that the economic value of these benefits outweighs the costs nationally and regionally. We advanced the policy applications of this research through a strategic campaign with three key elements: media communication, targeted outreach, and information for policymakers. Our strategy was to build widespread awareness of the research outcomes via media engagement, amplify our message via targeted outreach to citizens groups, and inform policy solutions by sharing research results with decision makers. The research was reported in more than 600 unique news stories in mainstream media outlets and received social media posts by members of Congress and senior White House officials. We amplified the messages via 14 webinars for citizens groups. We also held 16 briefings for policymakers and the public, in addition to meetings with relevant policy staff. Regional, state and federal policy leaders have used the research to understand air quality and health benefits of power plant carbon standards. This model of pairing research with media communication, targeted outreach, and information for policymakers is effective for bridging the gap between climate research and policy, and can be

  9. CDC WONDER: Population - Bridged-Race July 1st Estimates

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Population - Bridged-Race July 1st Estimates online databases report bridged-race population estimates of the July 1st resident population of the United States,...

  10. Precision monitoring of bridge deck curvature change during replacement.

    Science.gov (United States)

    2016-05-01

    This project was focused on development and deployment of a system for monitoring vertical : displacement in bridge decks and bridge spans. The system uses high precision wireless inclinometer : sensors to monitor inclinations at various points of a ...

  11. Behavior and analysis of an integral abutment bridge.

    Science.gov (United States)

    2013-08-01

    As a result of abutment spalling on the integral abutment bridge over 400 South Street in Salt Lake City, Utah, the Utah Department of Transportation (UDOT) instigated research measures to better understand the behavior of integral abutment bridges. ...

  12. Fatigue Testing of Dental Bridges on Selected Examples

    Directory of Open Access Journals (Sweden)

    Urban Dariusz

    2017-03-01

    Full Text Available The paper presents example tests of the functional quality of selected designs of dental bridges. These were: porcelain bridges on a metal base (cobalt based alloy, porcelain bridges on a zirconia base (zirconia ceramic – Zirkon Zahn, and full zirconia bridges (Zirkon Zahn. For the purpose of the study, durability of bridges in cyclic fatigue testing was adopted as a measure of their quality. The tests were carried out on a Zwick Roell Z010 universal testing machine. They consisted in cyclic loading and unloading of dental bridges mounted on gypsum models at a loading force of F= 400 [N] and a frequency of load of f= 1 [Hz]. Each bridge was subjected to a cycle of 7200 loads. The results show that there are no significant differences in the functional quality of the bridges.

  13. A fiber bridging model for fatigue delamination in composite materials

    International Nuclear Information System (INIS)

    Gregory, Jeremy R.; Spearing, S. Mark

    2004-01-01

    A fiber bridging model has been created to examine the effects of bridging on Mode I delamination fatigue fracture in a carbon fiber polymer-matrix composite. The model uses a cohesive zone law that is derived from quasi-static R-curves to determine the bridging energy applied in the bridged region. Timoshenko beam theory and an iterative self-consistent scheme are used to calculate the bridging tractions and displacements. After applying the bridging model to crack propagation data the scatter in the data was significantly reduced and clear trends were observed as a function of temperature that were not apparent previously. This indicated that the model appropriately accounted for the bridging in the experiments. Scanning electron microscopy crack opening displacement measurements were performed to validate the model's predictions. The measurements showed that the predictions were close to the actual bridging levels in the specimen

  14. Cost and Ecological Feasibility of using UHPC in Highway Bridges

    Science.gov (United States)

    2017-11-15

    There is a growing interest in expanding the use of Ultra-high performance concrete (UHPC) from bridge deck joints for accelerated bridge construction to complex architectural and advanced structural applications. The high costs currently associated ...

  15. Violin bridge mobility analysis under in-plane excitation.

    Science.gov (United States)

    Zhang, Cheng-Zhong; Zhang, Guang-Ming; Ye, Bang-Yan; Liang, Li-Dong

    2013-11-08

    The vibration of a violin bridge is a dynamic contact vibration with two interfaces: strings-bridge, and bridge feet-top plate. In this paper, the mobility of an isolated bridge under in-plane excitation is explored using finite element modeling based on the contact vibration model. Numerical results show that the dynamic contact stiffness in the two contact interfaces has a great impact on the bridge mobility. A main resonance peak is observed in the frequency range of 2-3 kHz in the frequency response of the isolated bridge when the contact stiffness is smaller than a critical threshold. The main resonance peak frequency is affected by the contact stiffness as well. In order to verify the numerical findings, a novel experimental system is then designed on the basis of a piezoelectric dynamometer for bridge mobility analysis. Experimental results confirm the impact of the dynamic contact stiffness on the bridge mobility.

  16. Implementation guidance for accelerated bridge construction in South Dakota

    Science.gov (United States)

    2017-09-01

    A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time a...

  17. Violin Bridge Mobility Analysis under In-Plane Excitation

    Directory of Open Access Journals (Sweden)

    Cheng-Zhong Zhang

    2013-11-01

    Full Text Available The vibration of a violin bridge is a dynamic contact vibration with two interfaces: strings-bridge, and bridge feet-top plate. In this paper, the mobility of an isolated bridge under in-plane excitation is explored using finite element modeling based on the contact vibration model. Numerical results show that the dynamic contact stiffness in the two contact interfaces has a great impact on the bridge mobility. A main resonance peak is observed in the frequency range of 2–3 kHz in the frequency response of the isolated bridge when the contact stiffness is smaller than a critical threshold. The main resonance peak frequency is affected by the contact stiffness as well. In order to verify the numerical findings, a novel experimental system is then designed on the basis of a piezoelectric dynamometer for bridge mobility analysis. Experimental results confirm the impact of the dynamic contact stiffness on the bridge mobility.

  18. Economic impact of closing low-volume rural bridges.

    Science.gov (United States)

    2013-02-01

    The State of Kansas has approximately 25,464 bridges that are located on the state, county and : city roadway network. As the infrastructure in Kansas ages, bridges can become structurally : deficient or functionally obsolete. The Kansas Department o...

  19. A quadcopter with heterogeneous sensors for autonomous bridge inspection.

    Science.gov (United States)

    2014-02-01

    Continuously monitoring a bridges health by sensor technologies has been widely used to maintain the operation of : a : roadwork while protecting public users safety. However, monitoring and inspecting numerous bridges in a state is a labor : -...

  20. Effects of ambient temperature changes on integral bridges.

    Science.gov (United States)

    2008-09-01

    Integral bridges (IBs) are jointless bridges whereby the deck is continuous and monolithic with abutment walls. IBs are outperforming their non-integral counterparts in economy and safety. Their principal advantages are derived from the absence of ex...

  1. Bridge Deck Runoff: Water Quality Analysis and BMP Effectiveness

    Science.gov (United States)

    2010-12-01

    The Alaska Department of Transportation (ADOT) is responsible for more than 700 bridges - most span water bodies. Are these water bodies affected by stormwater runoff from ADOT bridges? What are the regulatory and economic constraints on the ADOT reg...

  2. Multidisciplinary health monitoring of a steel bridge deck structure

    NARCIS (Netherlands)

    Pahlavan, P.L.; Pijpers, R.J.M.; Paulissen, J.H.; Hakkesteegt, H.C.; Jansen, T.H.

    2013-01-01

    Fatigue cracks in orthotropic bridge decks are an important cause for the necessary renovation of existing bridges. Parallel utilization of various technologies based on different physical sensing principles can potentially maximize the efficiency of structural health monitoring (SHM) systems for

  3. Fabrication of ultrashort niobium variable-thickness bridges

    International Nuclear Information System (INIS)

    Goto, T.

    1982-01-01

    A simple technique for the fabrication of niobium variable-thickness bridges of length approx.0.1 μm is described. The bridges are found to operate as ideal Josephson junctions over a wide temperature range

  4. Assessing the need for intermediate diaphragms in prestressed concrete bridges.

    Science.gov (United States)

    2008-03-01

    Reinforced concrete intermediate diaphragms (IDs) are currently being used in prestressed concrete (PC) girder bridges in Louisiana. Some of the advantages of providing IDs are disputed in the bridge community; the use of IDs increases the cost and t...

  5. Shear capacity of in service prestressed concrete bridge girders.

    Science.gov (United States)

    2010-05-17

    The design of prestressed concrete bridge girders has changed significantly over the past several : decades. Specifically, the design procedure to calculate the shear capacity of bridge girders that : was used forty years ago is very different than t...

  6. Dynamic properties of stay cables on the Penobscot Narrows bridge.

    Science.gov (United States)

    2014-09-01

    Cable-stayed bridges have been recognized as the most efficient and cost effective structural form for medium to long : span bridges over the past several decades. With their widespread use, cases of serviceability problems associated with : large am...

  7. Strength monitoring of bridge constructions and features of its application. Part 2. Continuous monitoring of bridge construction status

    Directory of Open Access Journals (Sweden)

    Ovchinnikov Igor Georgievich

    2014-06-01

    Full Text Available The article describes a system of continuous monitoring of bridge constructions — a system of observation over the operating conditions and behavior of the bridge structure, which is aimed at ensuring the preservation of its functional application properties within the specified limits, realized on the continuous, long-term basis with the use of instrumentation and ensures on-line presentation of information on the status of structure. To illustrate, one may consider the existing systems of continuous monitoring for a number of bridge constructions in the United States, Japan, Europe, South Korea, Greece and Russia. The article suggests to examine the systems of continuous monitoring of «Commodore John Barry» truss bridge, «Akashi-Kaikyo» suspension bridge, «Siggenthal» reinforced-concrete arch bridge, «Nimhe» suspension bridge, «Jindo»cable-stayed bridge, «Yandzhon» suspension bridge, «Banghwa» bridge, «Seohae» bridge and «Rio-Antirrio» bridge. In addition one may consider monitoring of the longitudinal launching of the bridge superstructures over the Volga River near the village Pristannoye in Saratov region. Finally, it was drawn the conclusion that monitoring of bridge constructions from the standpoint of their consumers is aimed at solving such important problems as preservation of bridge structures, increase in service life of bridge structures through timely detection of faults and their elimination, as well as preservation of bridge structure carrying capacity by controlling their behavior during the operation and improving the efficiency of expenditure of monetary resources for repair activities by correct determination of time and type of the necessary repair.

  8. Simulation and modeling of the crushing behavior of structural members

    International Nuclear Information System (INIS)

    Toi, Yutaka

    1986-01-01

    The analysis of the crushing behavior (the behavior of compressive breakdown accompanied by super large deformation) of structural members is an important subject which becomes the base of the ultimate strength design of the structures which may cause collision accident such as automobiles, ships and aircrafts, and of those which are feared to be collided such as offshore structures, bridge piers and nuclear power plants. However, since it is a phenomenon of very strong nonlinearity, its analysis is accompanied by large difficulty. In this report, three kinds of the approach for this problem, that is, rigid-plastic theoretical analysis, the simulation using a rigid body and spring model and nonlinear finite element analysis, are explained, referring to the example of calculation by the authors on the non-axisymmetric crushing problem of cylindrical shells. In crushing problem, the matters of concern are the amount of collision energy which can be absorbed by the plastic deformation of structures and the amount of deformation. It can be said that the increase of calculation cost brings about the heightening of calculation accuracy. The nonlinear finite element analysis is promising because its calculation cost is expected to lower in future. (Kako, I.)

  9. Update of bridge design standards in Alabama for AASHTO LRFD seismic design requirements.

    Science.gov (United States)

    2013-11-01

    The Alabama Department of Transportation (ALDOT) has been required to update their bridge design to the LRFD Bridge Design Specifications. This transition has resulted in changes to the seismic design standards of bridges in the state. Multiple bridg...

  10. Soil-structure interaction studies for understanding the behavior of integral abutment bridges.

    Science.gov (United States)

    2012-03-01

    Integral Abutment Bridges (IAB) are bridges without any joints within the bridge deck or between the : superstructure and the abutments. An IAB provides many advantages during construction and maintenance of : a bridge. Soil-structure interactions at...

  11. Identification of a disulfide bridge important for transport function of SNAT4 neutral amino acid transporter.

    Directory of Open Access Journals (Sweden)

    Rugmani Padmanabhan Iyer

    Full Text Available SNAT4 is a member of system N/A amino acid transport family that primarily expresses in liver and muscles and mediates the transport of L-alanine. However, little is known about the structure and function of the SNAT family of transporters. In this study, we showed a dose-dependent inhibition in transporter activity of SNAT4 with the treatment of reducing agents, dithiothreitol (DTT and Tris(2-carboxyethylphosphine (TCEP, indicating the possible involvement of disulfide bridge(s. Mutation of residue Cys-232, and the two highly conserved residues Cys-249 and Cys-321, compromised the transport function of SNAT4. However, this reduction was not caused by the decrease of SNAT4 on the cell surface since the cysteine-null mutant generated by replacing all five cysteines with alanine was equally capable of being expressed on the cell surface as wild-type SNAT4. Interestingly, by retaining two cysteine residues, 249 and 321, a significant level of L-alanine uptake was restored, indicating the possible formation of disulfide bond between these two conserved residues. Biotinylation crosslinking of free thiol groups with MTSEA-biotin provided direct evidence for the existence of a disulfide bridge between Cys-249 and Cys-321. Moreover, in the presence of DTT or TCEP, transport activity of the mutant retaining Cys-249 and Cys-321 was reduced in a dose-dependent manner and this reduction is gradually recovered with increased concentration of H2O2. Disruption of the disulfide bridge also decreased the transport of L-arginine, but to a lesser degree than that of L-alanine. Together, these results suggest that cysteine residues 249 and 321 form a disulfide bridge, which plays an important role in substrate transport but has no effect on trafficking of SNAT4 to the cell surface.

  12. Simplified Analytical Method for Optimized Initial Shape Analysis of Self-Anchored Suspension Bridges and Its Verification

    Directory of Open Access Journals (Sweden)

    Myung-Rag Jung

    2015-01-01

    Full Text Available A simplified analytical method providing accurate unstrained lengths of all structural elements is proposed to find the optimized initial state of self-anchored suspension bridges under dead loads. For this, equilibrium equations of the main girder and the main cable system are derived and solved by evaluating the self-weights of cable members using unstrained cable lengths and iteratively updating both the horizontal tension component and the vertical profile of the main cable. Furthermore, to demonstrate the validity of the simplified analytical method, the unstrained element length method (ULM is applied to suspension bridge models based on the unstressed lengths of both cable and frame members calculated from the analytical method. Through numerical examples, it is demonstrated that the proposed analytical method can indeed provide an optimized initial solution by showing that both the simplified method and the nonlinear FE procedure lead to practically identical initial configurations with only localized small bending moment distributions.

  13. RISK LEVEL ANALYSIS ON THE PREVENTIVE EROSION CAPACITY OF BRIDGES

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    Deficiency of the Preventive Erosion Capacity (PEC) of a bridge pier is the main factor leading to bridge failures. In this paper, the PEC of bridge piers was analyzed using the stochastic analysis method. The definitions of the reliability and risk level of a bridge pier subjected to water erosion were proposed and a computational model for erosion depth and risk level in was suggested.

  14. T-section glulam timber bridge modules : modeling and performance

    Science.gov (United States)

    Paul A. Morgan; Steven E. Taylor; Michael A. Ritter; John M. Franklin

    1999-01-01

    This paper describes the design, modeling, and testing of two portable timber bridges, each consisting of two noninterconnected longitudinal glued-laminated timber (glulam) deck panels 1.8 m (6 ft) wide. One bridge is 12.2 m (40 ft) long while the other bridge is 10.7 m (35 ft) long. The deck panels are fabricated in a unique double-tee cross section. The bridges...

  15. 305 Building 2 ton bridge crane and monorail assembly analysis

    International Nuclear Information System (INIS)

    Axup, M.D.

    1995-12-01

    The analyses in the appendix of this document evaluate the integrity of the existing bridge crane structure, as depicted on drawing H-3-34292, for a bridge crane and monorail assembly with a load rating of 2 tons. This bridge crane and monorail assembly is a modification of a 1 1/2 ton rated manipulator bridge crane which originally existed in the 305 building

  16. Concrete-Filled Steel Tube Arch Bridges in China

    Directory of Open Access Journals (Sweden)

    Jielian Zheng

    2018-02-01

    Full Text Available In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key construction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world’s longest CFST arch bridge—the First Hejiang Yangtze River Bridge. The main construction technologies of reinforced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges—the Guangxi Yongning Yong River Bridge and the Yunnan–Guangxi Railway Nanpan River Bridge—is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges. Keywords: Concrete-filled steel tube (CFST arch bridge, Steel-reinforced concrete arch bridge, Cable-stayed fastening-hanging cantilever assembly, Vacuum-assisted pouring in-tube concrete, Adjusting load by stay cables

  17. Bonding and Bridging Forms of Social Capital in Wildlife Tourism Microentrepreneurship: An Application of Social Network Analysis

    Directory of Open Access Journals (Sweden)

    Birendra KC

    2018-01-01

    Full Text Available Tourism has been recognized as an important economic sector, requiring a high degree of involvement from the entrepreneurial sector to diversify tourism products and services to meet increasing demand. Tourism is often considered a tool for economic development and a strategy to improve the livelihoods of rural citizens. Specifically, nature-based tourism, such as wildlife tourism, is growing faster than tourism in general, providing a myriad of opportunities for small-scale entrepreneurial engagement. However, several obstacles exist for these small-scale tourism enterprises, such as a lack of social capital. This study examined a network of wildlife tourism microentrepreneurs for bonding and bridging forms of social capital using a social network analysis approach, where bonding and bridging social capital have their own interpretation. Thirty-seven in-person interviews were conducted with wildlife tourism microentrepreneurs from North Carolina’s Pamlico Sound Region. The study revealed that microentrepreneurs interacted with each other in a bridging network structure. The ability to reciprocate with other members of the network was essential for business success. The results identified four key bridging ties connecting potential sub-groups in the network, connected to each other in a redundant fashion. We concluded that the formation of a bridging network structure was a function of entrepreneurial phenomena that may not promote a highly trusted, well-connected network. The findings and implications are further discussed in the paper.

  18. Bridges with Trigonometry Equals Engineering Achievement

    Science.gov (United States)

    Gathing, Ahmed L.

    2011-01-01

    Exemplary and fun technology education classes in high schools are always welcome. The author introduces bridge building to his ninth graders and other students who comprise the Introduction to Engineering and Technology course within the first two months of the fall semester. In Georgia, Introduction to Engineering and Technology is the first of…

  19. Standard plans for timber bridge superstructures

    Science.gov (United States)

    James P. Wacker; Matthew S. Smith

    2001-01-01

    These standardized bridge plans are for superstructures consisting of treated timber. Seven superstructure types are includes: five longitudinal and two transverse deck systems. Both HS520 and HS25 loadings are included, along with L/360 and L/500 deflection criteria.

  20. Circuit bridging of components by smoke

    International Nuclear Information System (INIS)

    Tanaka, T.J.; Nowlen, S.P.; Anderson, D.J.

    1996-10-01

    Smoke can adversely affect digital electronics; in the short term, it can lead to circuit bridging and in the long term to corrosion of metal parts. This report is a summary of the work to date and component-level tests by Sandia National Laboratories for the Nuclear Regulatory Commission to determine the impact of smoke on digital instrumentation and control equipment. The component tests focused on short-term effects such as circuit bridging in typical components and the factors that can influence how much the smoke will affect them. These factors include the component technology and packaging, physical board protection, and environmental conditions such as the amount of smoke, temperature of burn, and humidity level. The likelihood of circuit bridging was tested by measuring leakage currents and converting those currents to resistance in ohms. Hermetically sealed ceramic packages were more resistant to smoke than plastic packages. Coating the boards with an acrylic spray provided some protection against circuit bridging. The smoke generation factors that affect the resistance the most are humidity, fuel level, and burn temperature. The use of CO 2 as a fire suppressant, the presence of galvanic metal, and the presence of PVC did not significantly affect the outcome of these results