WorldWideScience

Sample records for bpa bonneville power

  1. Bonneville Power Administration 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  2. BPA Statutes.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1999-08-01

    This report contains the Bonneville Power Administration's (BPA's) authorizing statutes--the Bonneville Project Act, the Federal Columbia River Transmission System Act, the Pacific Northwest Electric Power Planning and Conservation Act and other laws that contain provisions that define BPA's mission and affect the way it is carried out.

  3. Bonneville Power Administration (BPA) and Washington Public Power Supply System (WPPSS). Part III. Oversight hearing before the Subcommittee on Mining, Forest Management, and Bonneville Power Administration of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Eight Congress, Second Session, March 28 and August 2, 1984

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Part III of the hearing record contains the testimony of Peter Johnson, Bonneville Power Administration (BPA) Administrator, and Energy Secretary Donald Hodel on the subject of BPA's contracts with the Washington Public Power Supply System (WPPSS) in which BPA will assume responsibility of WPPSS nuclear projects 1, 2, and 3. At issue was whether the contracts exceed BPA's authority and the protection of BPA's $1.9 billion invested in the projects. Johnson denied any secret agreements and emphasized that the intent was to preserve the assets for the federal government and federal power system. On the second hearing day, Hodel explained DOE's involvement in the agreements and its concurrence with BPA because of related litigation. An appendix with additional correspondence and statements submitted for the record follows the testimony

  4. Bonneville Power Administration 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  5. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  6. Draft Environmental Impact Statement: BPA/Puget Power Northwest Washington Transmission Project

    International Nuclear Information System (INIS)

    1993-11-01

    Bonneville Power Administration (BPS) and Puget Sound Power ampersand Light (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the city of Bellingham starting in 1995. The upgrades of the interconnected 230,000 volt (230-kV) and 115-kV systems are needed to increase the reliability of the local transmission system and to increase the import capacity on a nearby US-Canada 500-kV intertie by about 850 megawatts (MW). The increase in north-south transfer capability would be shared by BPA and Puget Power (about 425 MW each). Other actions would include replacement of an existing BPA 230-kV single-circuit, wood-pole H-frame transmission line with a lattice-steel double-circuit line; an existing Puget Power 115-kV single wood-pole transmission line rebuild, two short 115-kV Puget Power lines added at BPA's Bellingham Substation; and improvements made at existing BPA and Puget Power substations

  7. BPA Facts

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-03-01

    The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comes from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability

  8. Hydropower operations data management at Bonneville Power Administration

    International Nuclear Information System (INIS)

    Dies, R.

    2006-01-01

    The decision support software used by Bonneville Power Administration (BPA) in its operation of the Federal Columbia River Power System in the Pacific northwest was presented along with examples of water resources data and information regarding weather and stream flow. Water resources data is used extensively in hydropower operations for planning purposes through to real-time operations. This includes long-term historical hydrology and realtime system information on snow cover, river discharges and water elevations. Since the data comes from many different sources, the quality and frequency varies, with sample intervals ranging from seconds to days. Some data may be intermittent and transmitted only when thresholds are reached. Data can be communication via SCADA telemetry, the Internet, direct satellite feed, telephone or fax. The key requirement for a decision support system is the reliable and easily accessed compilation of all this data. The BPA uses long-term planning models, system-wide generation scheduling applications, and near-real-time optimization of generating units. It was suggested that the hydrologic forecasting community could benefit from the utility's experience using these applications. tabs., figs

  9. Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

    DEFF Research Database (Denmark)

    Makarov, Yuri V.; Yang, Bo; DeSteese, John G.

    2009-01-01

    This paper addresses the issue of mitigating additional intermittency and fast ramps that are expected to occur at high penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator...

  10. BPA Prepares for the 21st Century.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-04-01

    This is a brief review of the state of the Bonneville Power Administration. It reviews BPA`s competitive status, fish and wildlife funding, cost structure of the federal system, subscription sales of electricity, emergency cost recovery, cost reduction measures, transmission access and operation, and the 1998 power rate case decision making process.

  11. Bonneville Power Administration 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  12. Inflow forecasting at BPA

    Energy Technology Data Exchange (ETDEWEB)

    McManamon, A. [Bonneville Power Administration, Portland, OR (United States)

    2007-07-01

    The Columbia River Power System operates with consideration for flood control, endangered species, navigation, irrigation, water supply, recreation, other fish and wildlife concerns and power production. The Bonneville Power Association (BPA) located in Portland, Oregon is responsible for 35-40 per cent of the power consumed within the region. This presentation discussed inflow power concerns at BPA. The presentation illustrated elevational relief of projects; annual and daily variability; the hydrologic cycle; national river service weather forecasting service (NRSWFS); components of NRSWFS; and hydrologic forecast locations. Project operations and inventory were included along with a comparison of the 71-year average unregulated flow with regulated flow at the Dalles. Consistency between short-term and long-term forecasts and long-term streamflow forecasts were also illustrated in graphical format. The presentation also discussed the issue of reducing model and parameter uncertainty; reducing initial conditions uncertainty; snow updating; and reducing meteorological uncertainty. tabs., figs.

  13. BPA/Lower Valley transmission project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration and Lower Valley Power and Light, Inc. propose to solve a voltage stability problem in the Jackson and Afton, Wyoming areas. Lower Valley buys electricity from BPA and then supplies it to the residences and businesses of the Jackson and Afton, Wyoming areas. BPA is considering five alternatives. For the Agency Proposed Action, BPA and Lower Valley would construct a new 115-kV line from BPA's Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA's Teton Substation near Jackson in Teton County, Wyoming. The new line would be next to an existing 115-kV line. The Single-Circuit Line Alternative has all the components of the Agency Proposed Action except that the entire line would be supported by single-circuit wood pole H-frame structures. the Short Line Alternative has all the components of the Single-Circuit Line Alternative except it would only be half as long. BPA would also construct a new switching station near the existing right-of-way, west or north of Targhee Tap. Targhee Tap would then be removed. For the Static Var Compensation Alternative, BPA would install a Static Var Compensator (SVC) at Teton or Jackson Substation. An SVC is a group of electrical equipment placed at a substation to help control voltage on a transmission system. The No Action Alternative assumes that no new transmission line is built, and no other equipment is added to the transmission system

  14. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume I

    International Nuclear Information System (INIS)

    1985-01-01

    This Record of Decision (ROD) sets forth the Bonneville Power Administration's (BPA) reasons for settling litigation over the delay in constructing Washington Public Power Supply System (Supply System) Nuclear Project No. 3 (WNP-3). The litigation concerns the decision in May 1983 to defer construction until financing becomes available to the Supply System and a demonstrable need for the Project is established. The construction deferral was made at the request of the Administrator of BPA, a federal power marketing agency in the Pacific Northwest. BPA is obligated to pay principal and interest on bonds sold by the Supply System to finance 70 percent of the project. The construction delay was opposed by the project's minority owners, four Northwest investor-owned utilities (companies) which collectively own 30 percent of the project

  15. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  16. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  17. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program

    International Nuclear Information System (INIS)

    Glantz, C.S.; Burk, K.W.; Driver, C.J.; Liljegren, J.C.; Neitzel, D.A.; Schwartz, M.N.; Dana, M.T.; Laws, G.L.; Mahoney, L.A.; Rhoads, K.

    1992-04-01

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives

  18. Load Composition Model Workflow (BPA TIP-371 Deliverable 1A)

    Energy Technology Data Exchange (ETDEWEB)

    Chassin, David P.; Cezar, Gustavo V.; /SLAC

    2017-07-17

    This project is funded under Bonneville Power Administration (BPA) Strategic Partnership Project (SPP) 17-005 between BPA and SLAC National Accelerator Laboratory. The project in a BPA Technology Improvement Project (TIP) that builds on and validates the Composite Load Model developed by the Western Electric Coordinating Council's (WECC) Load Modeling Task Force (LMTF). The composite load model is used by the WECC Modeling and Validation Work Group to study the stability and security of the western electricity interconnection. The work includes development of load composition data sets, collection of load disturbance data, and model development and validation. This work supports reliable and economic operation of the power system. This report was produced for Deliverable 1A of the BPA TIP-371 Project entitled \\TIP 371: Advancing the Load Composition Model". The deliverable documents the proposed work ow for the Composite Load Model, which provides the basis for the instrumentation, data acquisition, analysis and data dissemination activities addressed by later phases of the project.

  19. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C S; Burk, K W; Driver, C J; Liljegren, J C; Neitzel, D A; Schwartz, M N; Dana, M T; Laws, G L; Mahoney, L A; Rhoads, K

    1992-04-01

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.

  20. Draft environmental impact statement - BPA/Lower Valley transmission project

    International Nuclear Information System (INIS)

    1997-06-01

    Bonneville Power Administration and Lower Valley Power and Light, Inc., propose to solve a voltage stability problem in the Jackson and Afton, Wyoming areas. For the Agency Proposed Action, BPA and Lower Valley would construct a new 115-kV line from BPA's Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA's Teton Substation near Jackson in Teton County, Wyoming. The new line would be next to an existing 115-kV line. Most of the line would be supported by a mix of single-circuit wood pole H-frame structures would be used. The Single-Circuit Line Alternative has all the components of the Agency Proposed Action except that the entire line would be supported by single-circuit structures. The Short Line Alternative has all the components of the Single-Circuit Line Alternative except it would then be removed. For the Static Var Compensation Alternative, BPA would install a Static Var Compensator (SVC) at Teton or Jackson Substation. An SVC is a group of electrical equipment placed at a substation to help control voltage on a transmission system. The No Action Alternative assumes that no new transmission line is built, and no other equipment is added to the transmission system. The USFS (Targhee and Bridger-Teton National Forests) must select al alternative based on their needs and objectives, decide if the project complies with currently approved forest plans, decide if special use permits or easements are needed for construction, operation, and maintenance of project facilities, and decide if they would issue special use permits and letters of consent to grant easements for the project

  1. BPA's Eighth Annual Energy Conservation Management Conference : Proceedings.

    Energy Technology Data Exchange (ETDEWEB)

    Energy Conservation Management Conference (8th : 1981); United States. Bonneville Power Administration.

    1981-01-01

    The five-year energy conservation program at Bonneville Power Administration (BPA) is described at the conference. An overview of the program is presented. Topics covered in panel discussions include: how utilities can work effectively with weatherization contractors, homebuilders, energy auditors, and weatherization material suppliers; mechanisms for implementing conservation programs in the commercial sector; experiences gained in existing residential weatherization programs; and streamlining relationships between consumers, utilities, and BPA in providing services and getting feedback. The planning, programming, technical assistance, and engineering thrusts of BPA's conservation programs are discussed. Indoor air quality, renewable energy, and the regulator's role in relationships to energy conservation are discussed. Passive solar programs, DOE initiatives in solar and conservation for buildings, conservation potential in the commercial and industrial sectors, and current conservation research and development are also discussed. (MCW)

  2. Bonneville - Hood River Vegetation Management Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  3. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  4. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    International Nuclear Information System (INIS)

    Englin, J.E.; Gygi, K.F.

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs

  5. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  6. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

  7. Indoor temperature changes after retrofit: inferences based on electricity billing data for nonparticipants and participants in the BPA Residential Weatherization Program

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; White, D.

    1985-07-01

    This report discusses changes in indoor temperatures in response to retrofit improvements. The data on which this analysis is based are from an evaluation of the Bonneville Power Administration (BPA) interim Residential Weatherization Program. The BPA program, operated through participating private and public utilities throughout the Pacific Northwest, offered financial assistance (generally a cash rebate) to encourage installation of energy-efficiency improvements to existing homes in the region. These retrofits included attic, wall, floor and heating duct insulation; storm windows and doors; clock thermostats; and caulking and weatherstripping. This program, which operated during 1982 and 1983, weatherized 104 thousand homes at a total cost to BPA of $157 million. In mid-1983, staff at Oak Ridge National Laboratory and Evaluation Research Corporation began an evaluation of the BPA program. The primary focus of this evaluation was assessment of the actual electricity saving that can be attributed to the program (Hirst, et al., 1985). These savings estimates were used to help assess the economic attractiveness of the program to participants, the BPA power system, and the Pacific Northwest region as a whole.

  8. 77 FR 15096 - Bonneville Power Administration; Notice of Compliance Filing

    Science.gov (United States)

    2012-03-14

    ... Commission's Order.\\1\\ \\1\\ Iberdrola Renewables, Inc. v. Bonneville Power Admin., 137 FERC ] 61,185 (2011... the Web site that enables subscribers to receive email notification when a document is added to a...

  9. Bonneville Power Administration`s Commercial Sector Conservation Market.

    Energy Technology Data Exchange (ETDEWEB)

    Gordan, Frederick M. [Pacific Energy Associates, Inc. (United States)

    1992-11-10

    Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

  10. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  11. Amendment of the assured delivery provisions of BPA's Long-Term Intertie Access Policy and increased assured delivery: Access for non-scheduling utilities. Record of decision

    International Nuclear Information System (INIS)

    1994-06-01

    Bonneville Power Administration's BPA's preferred alternative for providing non-Federal Pacific Northwest-Pacific Southwest (PNW-PSW) Intertie access is to adopt the Capacity Ownership alternative combined with the Increased Assured Delivery--Access for Non-Scheduling Utilities alternative. BPA's decision to offer Capacity Ownership was documented in a March 1994 Non-Federal Capacity Ownership Record of Decision (ROD). This ROD documents BPA's decision to facilitate PNW-PSW Intertie access by proceeding with (1) bidirectional Increased Assured Delivery--Access for Non Scheduling Utilities; and (2) amending the Assured Delivery provisions of BPA's Long-Term Intertie Access Policy (LTIAP). Given that the various non-Federal PNW-PSW Intertie access alternatives in the NFP EIS all allowed for different types of contracts, little environmental impact difference among the alternatives was found. Rather, environmental impact was found to be associated with whether exchange contracts or firm power sales contracts would predominate. Such impacts and related environmental analysis are discussed further in section 3.0 of this ROD

  12. Expanded BPA residential weatherization program: summary of regional health effects

    International Nuclear Information System (INIS)

    Sandusky, W.F.; Thor, P.W.; Alton, C.C.; Mellinger, P.J.; Cross, F.T.

    1984-11-01

    The Final Environmental Impact Statement (FEIS) for the Bonneville Power Administration (BPA) Expanded Residential Weatherization Program has been completed, printed, and distributed. This document incorporates numerous revisions based on both oral and written comments received during the public comment of the Draft Environmental Impact Statement (DEIS). The estimates of regional health effects were revised to incorporate results of the second Pacific Northwest Residential Energy Survey (PNWRES). The FEIS now expresses the estimated regional health effects in terms of incidence of cancers per 100,000 people exposed, which allows comparison to be made to the annual average risk of fatality by other causes. The estimates of regional health effects are also compared to health effects resulting from supplying and operating a conventional coal plant at a power level equal to the amount of energy saved from installation of additional tightening measures. Numerical results for the estimated health effects described above are provided. A summary of the comments received on the DEIS is also provided, along with estimated health effects associated with the Environmentally Preferred and BPA Preferred Alternatives to the Proposed Action. 8 refs., 3 figs., 5 tabs

  13. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Science.gov (United States)

    2013-07-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ13-10-000] United States Department of Energy; Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice... (OATT) and a Petition for Declaratory Order requesting the Commission find that Bonneville's OATT, as...

  14. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for...

  15. 75 FR 78694 - Proposed Residential Exchange Program Settlement Agreement Proceeding (REP-12); Public Hearing...

    Science.gov (United States)

    2010-12-16

    ..., 2010, on BPA's Web site at http://www.bpa.gov/corporate/ratecase/2012/rep-12.cfm . Hard copies of these.... Bonneville Power Admin., 928 F.2d 905 (9th Cir. 1991). Due to the burdensome, expensive and contentious... Electric v. Bonneville Power Admin., 501 F.3d 1009 (9th Cir. 2007) (PGE), the Court found that BPA had...

  16. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  17. Power Subscription Strategy: Administrator`s Record of Decision.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1998-12-01

    The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

  18. Operating years 1993 through 1995 power purchases

    International Nuclear Information System (INIS)

    1991-12-01

    Bonneville Power Administration (BPA) is obligated to supply electric power to its contractual customers. Based on a forecast of growing customer loads and assuming Critical Period water conditions in the Columbia River Basin, BPA is planning to meet a firm energy deficit during the four operating years (OY) 1992 through 1995, i.e., August 1991 through July 1995. BPA has executed several power purchase agreements to cover the projected OY 1992 deficit. The proposed action is to extend two existing one-year power purchase agreements for an additional three years to cover the four-year Critical Period energy deficit. The extension of these two one-year power purchase agreements would: (1) increase BPA's firm energy load-carrying capability; (2) allow BPA to meet its firm energy contractual commitments over the remaining three years of the four-year Critical Period from August 1, 1992, to July 31, 1995; (3) provide flexibility for BPA's use of hydroelectric resources over the Critical Period; and (4) increase system reliability. Under Critical Period water conditions, absent the proposed action, projected loads would exceed the capability of the Federal power system to serve those loads. The purpose of BPA's proposed action is to assure consistency with its statutory responsibilities, including those found in the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act)

  19. Annual Review of BPA-Funded Projects in Natural and Artificial Propagation of Salmonids, March 27-29, 1985, Holiday Inn Airport, Portland, Oregon.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1985-04-01

    The Fish and Wildlife Division of Bonneville Power Administration (BPA) hosted a meeting for contractors to present the results of fiscal year 1984 research conducted to implement the Northwest Power Planning Council's Fish and Wildlife Program. The meeting focused on those projects specifically related to natural and artificial propagation of salmonids. The presentations were held at the Holiday Inn Airport in Portland, Oregon, on March 27-29, 1985. This document contains abstracts of the presentations from that meeting. Section 1 contains abstracts on artificial propagation, fish health, and downstream migration, and Section 2 contains abstracts on natural propagation and habitat improvement. The abstracts are indexed by BPA Project Number and by Fish and Wildlife Program Measure. The registered attendees at the meeting are listed alphabetically in Appendix A and by affiliation in Appendix B.

  20. Northwest power gamble: Washington utilities go for broke on nuclear; region's citizens make conservation bid

    International Nuclear Information System (INIS)

    Brummer, J.

    1981-01-01

    The Washington Public Power Supply System (WPPSS) is asking for a reactor construction moratorium in an effort to get fast relief from the Bonneville Power Administration (BPA), which is authorized to guarantee power purchases from new power plants. Supporters of nuclear power plants as well as those of the soft energy path are watching to see how BPA will handle its mandate against acquiring new thermal plants until conservation and renewable energy potentials are exhausted. BPA can subvert the Pacific Northwest Power Act with 20-year contracts based on conventional forecasts despite evidence that new plants are unneeded. There is also evidence that the public rejects the idea of a moral obligation to bail out nuclear power cost overruns at taxpayer expense. The negotiations involve not only WPPSS and BPA, but Moody's Investor Service and environmental groups

  1. 75 FR 60745 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2010-10-01

    ... Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed from power revenues... financial assistance policy. The BFAI also comprise BPA's rules governing implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR Part 220 Cost Principles for...

  2. 75 FR 39241 - Hooper Springs Project

    Science.gov (United States)

    2010-07-08

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Hooper Springs Project AGENCY: Bonneville... (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs... proposed project would address voltage stability and reliability concerns of two of BPA's full requirements...

  3. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-11-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

  4. Climate Change Impacts on Water and Energy for Army Installations

    Science.gov (United States)

    2015-09-01

    CO; Houston, TX; Santa Fe, NM, Salt Lake City, UT; Carson City and Los Vegas, NV; and San Fran- cisco , CA (Melillo, Richmond, and Yohe 2014). This...United States, have already affected the Bonneville Power Administration (BPA). BPA markets electric power from the Bonneville Dam located on the...the electricity generated in the Electricity Market Module (EMM) region* and therefore this work’s forecast of the increase in future electricity gen

  5. 75 FR 15430 - Chief Joseph Hatchery Program

    Science.gov (United States)

    2010-03-29

    ... production program and hatchery facilities. The National Oceanic and Atmospheric Administration's National... DEPARTMENT OF ENERGY Bonneville Power Administration Chief Joseph Hatchery Program AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record...

  6. The power of competition

    International Nuclear Information System (INIS)

    Fuqua, G.L.; Pratt, J.H.; Elliot, J.

    1995-01-01

    The change-over from regulated monopolies to a non-regulated competitive market in the electric utility industry was discussed in terms of marketing and survival strategies for utilities it the newly competitive marketplace. The impact of low natural gas prices was prominently discussed as a danger to hydroelectricity generators because high efficiency turbine generators that are now available. Surplus power capacity in both the Canadian and US markets were discussed. The effects of independent power producers selling electricity wholesale to private utilities was also debated on account of its potential to change the role of the electric utility. The situation of the Bonneville Power Association (BPA), a self-financed government agency, as owner of 15 000 miles of transmission grid that is not allowed to own generation plants, was described. Strategies developed by BPA in an effort to adapt to the competitive market were described and were successful

  7. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  8. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  9. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... would be generated from their proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat...

  10. Bonneville Power Administration: financial fallout from termination of WPPSS nuclear projects 4 and 5. Oversight hearings before the Subcommittee on Mining, Forest Management, and Bonneville Power Administration of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Eighth Congress, First Session, February 14 and 15, 1983

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Peter T. Johnson, Administrator of the Bonneville Power Administration, and a representative of the Washington Public Power Supply System (WPPSS) described the financial situation resulting from the cancellations and cost overruns of WPPSS nuclear projects that have left the area with an unacceptable debt. Four panels representing area utilities and electric cooperatives described their financial positions on the second day of hearings. Two appendices with additional material from Bonneville, WPPSS, the Department of the Interior, and others follow the testimony

  11. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-05-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this booklet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  12. Power Subscription Strategy

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-12-21

    This document lays out the Bonneville Power Administration`s Power Subscription Strategy, a process that will enable the people of the Pacific Northwest to share the benefits of the Federal Columbia river Power System after 2001 while retaining those benefits within the region for future generations. The strategy also addresses how those who receive the benefits of the region`s low-cost federal power should share a corresponding measure of the risks. This strategy seeks to implement the subscription concept created by the Comprehensive Review in 1996 through contracts for the sale of power and the distribution of federal power benefits in the deregulated wholesale electricity market. The success of the subscription process is fundamental to BPA`s overall business purpose to provide public benefits to the Northwest through commercially successful businesses.

  13. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  14. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  15. Design and operation of the 30-MJ superconducting magnetic-storage system on the Bonneville Power Administration bus

    International Nuclear Information System (INIS)

    Schermer, R.I.; Barron, M.H.; Boenig, H.J.

    1983-01-01

    A superconducting magnetic-energy-storage (SMES) unit is suitable for power-system stabilization because it can provide positive damping by absorbing or releasing energy with a relatively fast response time, 10 ms. In the fall of 1982, an SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration as an experiment in monitoring, predicting and improving system stability. This paper reports principally on the system testing

  16. 18 CFR 35.30 - General provisions.

    Science.gov (United States)

    2010-04-01

    ... utilities to the Administrator of the Bonneville Power Administration (BPA) at the average system cost (ASC... determined by BPA in accordance with 18 CFR part 301. (b) Effectiveness of rates. (1) During the period... requirements. Within 15 business days of the date of issuance of the BPA report on a utility's ASC, the utility...

  17. The future of GPS-based electric power system measurements, operation and control

    Energy Technology Data Exchange (ETDEWEB)

    Rizy, D.T. [Oak Ridge National Lab., TN (United States); Wilson, R.E. [Western Area Power Administration, Golden, CO (United States); Martin, K.E.; Litzenberger, W.H. [Bonneville Power Administration, Portland, OR (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Overholt, P.N. [Dept. of Energy, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States)

    1998-11-01

    Much of modern society is powered by inexpensive and reliable electricity delivered by a complex and elaborate electric power network. Electrical utilities are currently using the Global Positioning System-NAVSTAR (GPS) timekeeping to improve the network`s reliability. Currently, GPS synchronizes the clocks on dynamic recorders and aids in post-mortem analysis of network disturbances. Two major projects have demonstrated the use of GPS-synchronized power system measurements. In 1992, the Electric Power Research Institute`s (EPRI) sponsored Phase Measurements Project used a commercially available Phasor Measurements Unit (PMU) to collect GPS-synchronized measurements for analyzing power system problems. In 1995, Bonneville Power Administration (BPA) and Western Area Power Administration (WAPA) under DOE`s and EPRI`s sponsorship launched the Wide Area Measurements (WAMS) project. WAMS demonstrated GPS-synchronized measurements over a large area of their power networks and demonstrated the networking of GPS-based measurement systems in BPA and WAPA. The phasor measurement technology has also been used to conduct dynamic power system tests. During these tests, a large dynamic resistor was inserted to simulate a small power system disturbance.

  18. Conductor qualification tests for the 30-MJ Bonneville Power Administration SMES coil

    International Nuclear Information System (INIS)

    Schermer, R.I.; Boenig, H.J.; Henke, M.; Turner, R.D.; Schramm, R.

    1980-01-01

    The 30-MJ energy storage coil for the Bonneville Power Administration requires a low-loss, cryostable conductor that is able to carry 4.9 kA in a field of 2.8 T and will maintain its properties over 10 8 partial discharge cycles. The multi-level cable which satisfies these requirements has been extensively tested at various stages in its development and in its final form. Tests have been performed to determine the effect of manufacturing options on ac losses, low temperature electrical resistivity, stability, and fatigue resistance of the insulated conductor. This paper will concentrate on the stability and fatigue tests which have not previously been reported

  19. Survey of magnetic fields near BPA 230-kV and 500-kV transmission lines

    International Nuclear Information System (INIS)

    Perrin, N.; Aggarwal, R.P.

    1991-01-01

    The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs

  20. Business plan: Supplemental draft environmental impact statement. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS

  1. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  2. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-06-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the EMF (electric and magnetic fields) produced by power lines and other electrical devices affect our health. Although no adverse health effects of electric power EMF have been confirmed, there is continued scientific uncertainty about this issue. Research on EMF is ongoing throughout the world. The purpose of this booklet is to answer some common questions that the BPA (Bonneville Power Administration) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  3. 78 FR 57372 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2013-09-18

    ... established in 1937 as a Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed... implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR Part 220 Cost Principles for Educational Institutions (Circular A-21); 2 CFR Part 225 Cost Principles for...

  4. 76 FR 63290 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2011-10-12

    ... established in 1937 as a Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed... implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR part 220 Cost Principles for Educational Institutions (CircularA-21); 2 CFR part 225 Cost Principles for...

  5. 77 FR 58984 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2012-09-25

    ... established in 1937 as a Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed... implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR Part 220 Cost Principles for Educational Institutions (CircularA-21); 2 CFR Part 225 Cost Principles for...

  6. Northeast Oregon Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1996-08-01

    Development of the hydropower system in the Columbia River Basin has had far-reaching effects on many species of wildlife. The Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the Federal portion of this system, as allocated to the purpose of power production. BPA needs to mitigate for loss of wildlife habitat in the Snake River Subbasin

  7. Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

    2010-04-01

    Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

  8. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume II. Exhibits

    International Nuclear Information System (INIS)

    1985-01-01

    This exchange is between BPA and Portland General Electric Company, Puget Sound Power and Light Company, and the Washington Water Power Company. Pacific Power and Light Company (Pacific) is not initially a party to the exchange. Pacific may at any time prior to January 1, 1994 elect on at least 12 months notice to enter the exchange provided that if BPA determines to resume full plant construction Pacific must elect or forego the option within 6 months after construction is resumed. If the plant is terminated at a time when the option has not been exercised, the option may not thereafter be exercised. If Pacific elects to make the exchange effective and the plant is later terminated prior to the effective data of the exchange, the exchange will become effective on the specified data, unless, prior to such data. Pacific notifies BPA that is rescinds such prior election

  9. 48 CFR 915.404-4 - Profit.

    Science.gov (United States)

    2010-10-01

    ... TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4 Profit. (c)(4)(i) Contracting officer...) and Bonneville Power Administration (BPA) functions. Pursuant to section 602(d) (13) and (20) of the...

  10. A Study to Determine the Biological Feasibility of a New Fish Tagging System; Annual Report 1994-1996.

    Energy Technology Data Exchange (ETDEWEB)

    Downing, Sandra L.; Frost, Deborah A.; Jonasson, Bruce F.; Nunnallee, Edmund P.; Peterson, Bradley W.; Prentice, Earl F.; Snell, Glen A.

    1998-11-01

    A multiyear program to evaluate the technical and biological feasibility of a new identification system for salmonids established between the Bonneville Power Administration (BPA) and the National Marine Fisheries Service (NMFS) in 1983.

  11. Draft 1992 Resource Program : Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future resource needs -- how much new resource development is needed by BPA, which types of resources to acquire and option, how to go about acquiring them, and how much to spend. The Northwest Power Planning Council completed a new Northwest Power Plan in 1991. This Draft Resource Program describes how BPA proposes to do its part to meet the Council's regional resource objectives.

  12. Ground source heat pump retrofit at North Bonneville, WA City Hall

    Energy Technology Data Exchange (ETDEWEB)

    Hughey, M. [Skamania Co. PUD No. 1, Carson, WA (United States)

    1997-12-31

    In 1995, the City of North Bonneville, WA installed a 10-ton Ground Source Heat Pump (GSHP) to replace the electric resistance furnace in its 4,000 square, foot City Hall. North Bonneville is 30 miles east of Portland, Oregon, at river level in the Columbia River Gorge. Funded jointly by the Bonneville Power Administration, the State of Washington and the City, this project has successfully reduced the heating cost of City Hall by nearly one-half while dramatically increasing comfort. It has become a commercial model in the Pacific Northwest for assessing values of commercial GSHP retrofits. This interim report compares estimated savings with actual experience for the first operating year. Projected savings were $1,500; actual savings were $1,390 prior to adjustment for extreme weather. Adjusted savings for Heating Year 1996 were $1,490, a 47 percent decrease. Maintenance savings (not itemized) were in addition to this amount. Monitoring continues in 1997.

  13. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  14. 1991 Pacific Northwest loads and resources study, Pacific Northwest economic and electricity use forecast

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides detailed documentation of the load forecast scenarios and assumptions used in preparing BPA's 1991 Pacific Northwest Loads and Resources Study (the Study). This is one of two technical appendices to the Study; the other appendix details the utility-specific loads and resources used in the Study. The load forecasts and assumption were developed jointly by Bonneville Power Administration (BPA) and Northwest Power Planning Council (Council) staff. This forecast is also used in the Council's 1991 Northwest Conservation and Electric Power Plan (1991 Plan)

  15. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  16. LGR adult trap data - Operation of the adult trap at Lower Granite Dam

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This Bonneville Power Administration (BPA) - funded project pays for NOAA staff to operate the adult salmon trap located in the fish ladder at Lower Granite Dam. The...

  17. Issue update: a regional settlement proposal to resolve the Washington Nuclear Plant No. 3 lawsuit

    International Nuclear Information System (INIS)

    1985-08-01

    The Bonneville Power Administration (BPA) announced on August 2, 1985, that a number of substantive changes suggested by public comment on the Washington Nuclear Plant No. 3 settlement had been agreed to in principle by BPA and four private utilities. Since that date the details of these changes have been resolved, and the proposed settlement is now being offered for public review and comment

  18. Development of High-Efficiency Low-Lift Vapor Compression System - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Katipamula, Srinivas; Armstrong, Peter; Wang, Weimin; Fernandez, Nicholas; Cho, Heejin; Goetzler, W.; Burgos, J.; Radhakrishnan, R.; Ahlfeldt, C.

    2010-03-31

    PNNL, with cofunding from the Bonneville Power Administration (BPA) and Building Technologies Program, conducted a research and development activity targeted at addressing the energy efficiency goals targeted in the BPA roadmap. PNNL investigated an integrated heating, ventilation and air conditioning (HVAC) system option referred to as the low-lift cooling system that potentially offers an increase in HVAC energy performance relative to ASHRAE Standard 90.1-2004.

  19. 1991 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 1.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    This publication provides detailed documentation of the load forecast scenarios and assumptions used in preparing BPA's 1991 Pacific Northwest Loads and Resources Study (the Study). This is one of two technical appendices to the Study; the other appendix details the utility-specific loads and resources used in the Study. The load forecasts and assumption were developed jointly by Bonneville Power Administration (BPA) and Northwest Power Planning Council (Council) staff. This forecast is also used in the Council's 1991 Northwest Conservation and Electric Power Plan (1991 Plan).

  20. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  1. Increased Levels of Harvest and Habitat Law Enforcement and Public Awareness for Anadromous Salmonids and Resident Fish in the Columbia River Basin -- Demonstration Period, 1992--1994, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    NeSmith, Frank (Idaho Department of Fish and Game, Boise, ID); Long, Mack (Montana Department of Fish, Wildlife and Paks, Kalispell, MT); Matthews, Dayne (Washington Department of Fish and Wildlife, Olympia, WA)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin.

  2. Increased levels of harvest and habitat law enforcement and public awareness for anadromous salmonids and resident fish in the Columbia River Basin - Demonstration period, 1992-1994. Final report

    International Nuclear Information System (INIS)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin

  3. Bisphenol A (BPA)

    Science.gov (United States)

    ... Smoke Cockroaches Dust Mites Pets & Animals Pollen Aloe Vera Arsenic Bisphenol A (BPA) Bisphenol A (BPA) Cell ... including use in some food and drink packaging, e.g., water and infant bottles, compact discs, impact- ...

  4. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  5. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  6. Wildlife Mitigation Program. Record of Decision

    International Nuclear Information System (INIS)

    1997-06-01

    Bonneville Power Administration (BPA) has decided to adopt a set of Descriptions (goals, strategies, and procedural requirements) that apply to future BPA-funded wildlife mitigation projects. Various. sources-including Indian tribes, state agencies, property owners, private conservation groups, or other Federal agencies-propose wildlife mitigation projects to the Northwest Power Planning Council (Council) for BPA funding. Following independent scientific and public reviews, Council then selects projects to recommend for BPA funding. BPA adopts this set of prescriptions to standardize the planning and implementation of individual wildlife mitigation projects. This decision is based on consideration of potential environmental impacts evaluated in BPA's Wildlife Mitigation Program Final Environmental Impact Statement (DOE/EIS-0246) published March, 20, 1997, and filed with the Environmental Protection Agency (EPA) the week of March 24, 1997 (EPA Notice of Availability Published April 4, 1997, 62 FR 65, 16154). BPA will distribute this Record of Decision to all known interested and affected persons, groups, tribes, and agencies

  7. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  8. On the Use of Energy Storage Technologies for Regulation Services in Electric Power Systems with Significant Penetration of Wind Energy

    DEFF Research Database (Denmark)

    Yang, Bo; Makarov, Yuri; Desteese, John

    2008-01-01

    Energy produced by intermittent renewable resources is sharply increasing in the United States. At high penetration levels, volatility of wind power production could cause additional problems for the power system balancing functions such as regulation. This paper reports some partial results...... and frequently changing regulation signal. Several energy storage options have been analyzed based on thirteen selection criteria. The evaluation process resulted in the selection of flywheels, pumped hydro electric power (or conventional hydro electric power) plant and sodium sulfur or nickel cadmium batteries...... of a project work, recently conducted by the Pacific Northwest National Laboratory (PNNL) for Bonneville Power Administration (BPA). The project proposes to mitigate additional intermittency with the help of Wide Area Energy Management System (WAEMS) that would provide a two-way simultaneous regulation service...

  9. Grande Ronde Basin endemic spring chinook salmon supplementation program

    International Nuclear Information System (INIS)

    1998-02-01

    As part of its responsibilities under the Northwest Power Act (Pacific Northwest Electric Power Planning and Conservation Act of 1980), Bonneville Power Administration (BPA) must mitigate the loss of fish, wildlife, and related spawning grounds and habitat attributable to power production at federal hydroelectric dams on the Columbia River and its tributaries. The federal dams have been identified as a major source of mortality for the listed Snake River salmon stocks. BPA also has responsibilities under the Endangered Species Act (ESA) of 1973 to operate in a way that does not jeopardize the continued existence of listed species and to use its agency resources to conserve listed species

  10. The Bonneville Power Administration new energy-efficient homes programs: Final environmental impact statement: Volume 1, Assessing indoor air quality options

    International Nuclear Information System (INIS)

    1988-03-01

    BPA has underway marketing and incentive programs to encourage the construction of new energy-efficient homes that comply with Model Conservation Standards (MCS) developed by the Northwest Power Planning Council. These homes are designed to have lower infiltration rates than current building practices provide, which is likely to contribute to increased levels of indoor air pollutants, and may adversely affect the health of occupants. BPA's current and past new homes programs maintained ventilation rates comparable to those found in current practice homes by requiring balanced mechanical ventilation. BPA now proposes to give builders and consumers more flexibility by increasing the options for protecting indoor air quality in its new homes programs. This proposal is the impetus for this Environmental Impact Statement (EIS), which was prepared for BPA by Pacific Northwest Laboratory. BPS is preparing this EIS to assess whether other techniques maintain indoor air quality comparable to that found in homes built using current practices. Although many pollutants are potentially of great concern, our analysis concentrates on radon and formaldehyde. It is based on measured concentrations of these pollutants and measured ventilation rates in current practice. Ventilation was measured using fan pressurization tests, which measure only air leakage, and perfluorocarbon tracer gas (PFT) tests, which account for ventilation from mechanical devices and occupant behavior in addition to air leakage. These tests yielded two different estimates. We used these data to estimate pollutant concentrations and lifetime cancer rates under three alternative actions. Under all of the alternatives, radon had a much greater effect than formaldehyde. 102 refs

  11. Shillapoo Wildlife Area 2007 Follow-up HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-03-01

    In April and May 2007 the Regional HEP Team (RHT) conducted a follow-up HEP analysis on the Egger (612 acres) and Herzog (210 acres) parcels located at the north end of the Shillapoo Wildlife Area. The Egger and Herzog parcels have been managed with Bonneville Power Administration funds since acquired in 1998 and 2001 respectively. Slightly more than 936 habitat units (936.47) or 1.14 HUs per acre was generated as an outcome of the 2007 follow-up HEP surveys. Results included 1.65 black-capped chickadee HUs, 280.57 great blue heron HUs, 581.45 Canada goose HUs, 40 mallard HUs, and 32.80 mink HUs. Introduction A follow-up Habitat Evaluation Procedures (HEP) (USFWS 1980) analysis was conducted by the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) during April and May 2007 to document changes in habitat quality and to determine the number of habitat units (HUs) to credit Bonneville Power Administration (BPA) for providing operation and maintenance (O&M) funds since WDFW acquired the parcels. The 2007 follow-up HEP evaluation was limited to Shillapoo Wildlife Area (SWA) parcels purchased with Bonneville Power Administration funds. D. Budd (pers. comm.) reported WDFW purchased the 612 acre Egger Farms parcel on November 2, 1998 for $1,737,0001 and the 210 acre Herzog acquisition on June 21, 2001 for $500,000 with Memorandum of Agreement funds (BPA and WDFW 1996) as partial fulfillment of BPA's wildlife mitigation obligation for construction of Bonneville and John Day Dams (Rasmussen and Wright 1989). Anticipating the eventual acquisition of the Egger and Herzog properties, WDFW conducted HEP surveys on these lands in 1994 to determine the potential number of habitat units to be credited to BPA. As a result, HEP surveys and habitat unit calculations were completed as much as seven years prior to acquiring the sites. The term 'Shillapoo Wildlife Area' will be used to describe only the Herzog and Egger parcels in this

  12. BPA efforts to protect salmon and supply energy

    International Nuclear Information System (INIS)

    Geiselman, J.; Schiewe, R.

    1993-01-01

    The Bonneville Power Administration has sought to increase numbers of anadromous fish in the Columbia River for many years. In spite of these efforts, numbers of some species have continued to decline while others increased. As a result, several species of Salmon from the Snake River portion of the Columbia River basin have been listed as threatened or endangered under the Endangered Species Act. This presentation will identify analytical tools used to assess fish mitigation measures and the changes in power production and marketing expected from implementation of the National Marine Fisheries Service Recovery Plan and the Northwest Power Planning Council's Fish and Wildlife Program

  13. Labelling of 4-dihydroxyborylphenylalanine(BPA) with 99Tcm and biodistribution of 99Tcm-DMG-BPA

    International Nuclear Information System (INIS)

    Xiao Yan; Tu Jing; Tang Xiuhuan; Tang Lingtian; Wang Xiangyun

    2005-01-01

    BPA(4-dihydroxyborylphenylalanine) has being used in clinical trials for treatment of cancer with boron neutron capture therapy (BNCT) technology for its selective accumulation in tumors. BPA is prepared according to the published synthetic procedure. A new BATO complex is synthesized with dimethylglyoxime, BPA, and 99 Tc m O 4 - as the starting materials via a template reaction. The biodistribution of 99 Tc m -DMG-BPA is studied. The results demonstrate that the complex is selectively accumulated in tumor and slowly cleared from it, the uptake in tumor is higher than in blood, heart, muscle and most of the other organs. The uptake ratio of tumor-to-tissue increased along with time. At 4 hour after injection, the uptake ratio of tumor to muscle reached 6.0, tumor/blood 4.5, tumor/heart 6.0, tumor/lung 3.0, tumor/liver 0.41, and tumor/kidney 0.134. The possible molecular structure of 99 Tc m -DMG-BPA complex is predicated by ab inito MO calculation. (authors)

  14. 123I-BPA and 123I-BPA-fructose complex as a new radiopharmaceutical for the imaging of amino acid transport in tumor

    International Nuclear Information System (INIS)

    Choi, T. H.; Choi, C. W.; Woo, K. S.; Chung, W. S.; Lim, S. J.; Lee, S. J.; Hong, S. W.; Lim, S. M.

    1999-01-01

    Boronophenylalanine (BPA) as derivative of phenylalanine, was used to treatment for glioma and melanoma in BNCT. We labeled BPA with radioiodides for tumor imaging of amino acid transport with gamma camera. Because of limited solubility of BAP, I-BPA-Fructose(I-BPA was complexed with fructose) to increase solubility. I-BPA was labeled by chloramine T coated bead method. Serum stability of I-BPA analyzed by HPLC at 37 .deg. C. Cellular uptake of I-BPA and I-BPA-Fructose was compared in 9L glioma and B16 melanoma. To see biodistribution, I-BPA 9x10 5 Bq(20 μg/100 μl) or I-BPA-Fructose 9x10 5 Bq(20 μg/fructose 55 μg/100 μl) was injected to B16 melanoma bearing C57 mice. In tumor bearing mice at 30 min, 1, 2, 24 hr after injection of tracers (n-4 per group). In 24hr, radiochemical purity of I-BPA in serum was retained above 90%. In cultured cells the maximum uptake was observed at 60min. In 9L glioma cells, %uptake of I-BPA and I-BPA-Fructose was 2.05, 2.6 at 60min. But in B16 melanoma, %uptake of I-BPA and I-BPA and-Fructose was 2.57, 6.62 at 60 min. In melanoma bearing mice, tumor/muscle ratio of I-BPA in 30 min, 1hr, 2hr, 24hr after injection was 1.48, 2.19, 2.28, 0.29 and %ID/g of tumor was 6.25, 5.17, 3.52, 0.29. Tumor/muscle ratio of I-BPA-Fructose was 1.51, 2.05, 2.1, 2.84 in 30 min, 1hr, 2hr, 24hr post-injection and %ID/g of tumor was 4.61, 3.65, 2.93, 0.71. The radioactivity was excreted mainly via hepatobiliary tract to the intestine. I-BPA was stable in serum upto 24hr. Uptake of I-BPA-Fructose was higher than I-BPA in melanoma cells. I-BPA-Fructose, is a promising tumor imaging radiopharmaceutical in some tumors

  15. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  16. Mid-Columbia Coho Reintroduction Feasibility Project. Final Environmental Assessment and Finding of No Significant Impact

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact

  17. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  18. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  19. Bisphenol A (BPA) in U.S. food.

    Science.gov (United States)

    Schecter, Arnold; Malik, Noor; Haffner, Darrah; Smith, Sarah; Harris, T Robert; Paepke, Olaf; Birnbaum, Linda

    2010-12-15

    Bisphenol A (BPA) is a chemical used for lining metal cans and in polycarbonate plastics, such as baby bottles. In rodents, BPA is associated with early sexual maturation, altered behavior, and effects on prostate and mammary glands. In humans, BPA is associated with cardiovascular disease, diabetes, and male sexual dysfunction in exposed workers. Food is a major exposure source. We know of no studies reporting BPA in U.S. fresh food, canned food, and food in plastic packaging in peer reviewed journals. We measured BPA levels in 105 fresh and canned foods, foods sold in plastic packaging, and in cat and dog foods in cans and plastic packaging. We detected BPA in 63 of 105 samples, including fresh turkey, canned green beans, and canned infant formula. Ninety-three of these samples were triplicates which had similar detected levels. Detected levels ranged from 0.23 to 65.0 ng/g ww and were not associated with type of food or packaging but did vary with pH. BPA levels were higher for foods of pH 5 compared to more acidic and alkaline foods. Detected levels were comparable to those found by others. Further research is indicated to determine BPA levels in U.S. food in larger, representative sampling.

  20. Legacy Panorama on Spirit's Way to 'Bonneville'

    Science.gov (United States)

    2005-01-01

    [figure removed for brevity, see original site] Click on the image for Legacy Panorama on Spirit's Way to 'Bonneville' (QTVR) This view captured by the panoramic camera on NASA's Mars Exploration Rover Spirit nearly a year ago is called Spirit's 'Legacy' panorama. It combines many frames acquired during Spirit's 59th through 61st martian days, or sols (March 3 to 5, 2004) from a position about halfway between the landing site and the rim of 'Bonneville Crater.' The location is within the transition from the relatively smooth plains to the more rocky and rugged blanket of material ejected from Bonneville by the force of the impact that dug the crater. The panorama spans 360 degrees and consists of images obtained in 78 individual pointings. The camera took images though 5 different filter at each pointing. This mosaic is an approximately true-color rendering generated using the images acquired through filters centered at wavelengths of 750, 530, and 480 nanometers. The Columbia Memorial Station lander can be seen about 200 meters (about 650 feet) in the distance by following the rover tracks back toward right of center in the mosaic and zooming in.

  1. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  2. Non-Federal participation in AC Intertie: Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) is considering action in two areas: (1) non-Federal access to the AC Intertie, and, (2) BPA Intertie marketing. BPA's preferred alternative for non-Federal access is the Capacity Ownership alternative combined with the Increased Assured Delivery -- Access for Non-Scheduling Utilities alternative; the preferred alternative for BPA Intertie marketing is the Federal Marketing and Joint Ventures alternative. BPA considered these two areas previously in its Intertie Development and Use EIS of April 1988. The EIS resulted in BPA decisions to participate in the construction of the Third AC Intertie, to allow non-Federal access to BPA's share of the Pacific Northwest-Pacific Southwest (PNW-PSW) Intertie (AC and DC lines) pursuant to a Long-Term Intertie Access Policy (LTIAP), and to pursue BPA's export marketing alternative. The decision on allowing direct financial non-Federal participation in the Third AC line was deferred to a later, separate process, examined here. Also, BPA's export marketing objectives must now be examined in view of changed operations of Columbia River hydro facilities for improved fish survival

  3. Non-Federal Participation in AC Intertie : Final Environmental Impact Statement. Volume 1: Environmental Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    Bonneville Power Administration (BPA) is considering action in two areas: (1) non-Federal access to the AC Intertie, and, (2) BPA Intertie marketing. BPA`s preferred alternative for non-Federal access is the Capacity Ownership alternative combined with the Increased Assured Delivery -- Access for Non-Scheduling Utilities alternative; the preferred alternative for BPA Intertie marketing is the Federal Marketing and Joint Ventures alternative. BPA considered these two areas previously in its Intertie Development and Use EIS of April 1988. The EIS resulted in BPA decisions to participate in the construction of the Third AC Intertie, to allow non-Federal access to BPA`s share of the Pacific Northwest-Pacific Southwest (PNW-PSW) Intertie (AC and DC lines) pursuant to a Long-Term Intertie Access Policy (LTIAP), and to pursue BPA`s export marketing alternative. The decision on allowing direct financial non-Federal participation in the Third AC line was deferred to a later, separate process, examined here. Also, BPA`s export marketing objectives must now be examined in view of changed operations of Columbia River hydro facilities for improved fish survival.

  4. Hot Springs-Garrison Fiber Optic Project

    International Nuclear Information System (INIS)

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA's substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA

  5. Hot Springs-Garrison Fiber Optic Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA`s substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA.

  6. StreamNet: FY 1999 annual progress report

    International Nuclear Information System (INIS)

    Columbia River Inter-Tribal Fish Commission

    2000-01-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The views of this report are the author's and do not necessarily represent the views of BPA. This annual report covers progress made by: Columbia River Inter-Tribal Fish Commission Idaho; Department of Fish and Game; Montana Department of Fish, Wildlife and Parks; Oregon Department of Fish and Wildlife; Pacific States Marine Fisheries Commission; Shoshone-Bannock Tribes; US Fish and Wildlife Service; Washington Department of Fish and Wildlife; and FY1999 StreamNet Quickplan

  7. Evaluation of carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 1 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity

  8. BPA riparian fencing and alternative water development projects completed within Asotin Creek Watershed ; 2000 and 2001 Asotin Creek fencing final report of accomplishments

    International Nuclear Information System (INIS)

    Johnson, B.J.Bradley J.

    2002-01-01

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife's (WDFW) Priority WRIA's by ''At-Risk Stock Significance Map'', it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for endangered salmonids since 1994. The ''Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00'' teamed BPA and the Governor's Salmon Recovery Funding to plant approximately 84

  9. Continental Illinois National Bank v. Washington: does the contract clause mandate the completion of nuclear power plants at all costs

    International Nuclear Information System (INIS)

    Snowden, E.A.

    1984-01-01

    Although the Washington Public Power Supply System (WPPSS)/Bonneville Power Administration (BPA) contracts were substantially impaired, the reasoning by which the Ninth Circuit court found the WPPSS/bondholders contracts to be unconstitutionally impaired is flawed. Because none of the cases before or since United States Trust have found legislation unconstitutional without a showing of a substantial impairment, the case should be limited to its facts and not used as a precedent. The relative burdens imposed on the bondholders by stopping construction are small compared to the cost to the ratepayers of completing unneeded plants. The court should have upheld the cost study requirement of Initiative 394 even if it believed the voter approval requirement was unjustified. The cost study requirement's impairment of the contracts was negligible or nonexistant. 130 references

  10. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  11. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  12. Wildlife mitigation program. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information

  13. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  14. Resource programs: Draft Environmental Impact Statement Resource Programs

    International Nuclear Information System (INIS)

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program's Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS

  15. Air, hand wipe, and surface wipe sampling for Bisphenol A (BPA) among workers in industries that manufacture and use BPA in the United States.

    Science.gov (United States)

    Hines, Cynthia J; Jackson, Matthew V; Christianson, Annette L; Clark, John C; Arnold, James E; Pretty, Jack R; Deddens, James A

    2017-11-01

    For decades, bisphenol A (BPA) has been used in making polycarbonate, epoxy, and phenolic resins and certain investment casting waxes, yet published exposure data are lacking for U.S. manufacturing workers. In 2013-2014, BPA air and hand exposures were quantified for 78 workers at six U.S. companies making BPA or BPA-based products. Exposure measures included an inhalable-fraction personal air sample on each of two consecutive work days (n = 146), pre- and end-shift hand wipe samples on the second day (n = 74 each), and surface wipe samples (n = 88). Potential determinants of BPA air and end-shift hand exposures (after natural log transformation) were assessed in univariate and multiple regression mixed models. The geometric mean (GM) BPA air concentration was 4.0 µg/m 3 (maximum 920 µg/m 3 ). The end-shift GM BPA hand level (26 µg/sample) was 10-times higher than the pre-shift level (2.6 µg/sample). BPA air and hand exposures differed significantly by industry and job. BPA air concentrations and end-shift hand levels were highest in the BPA-filled wax manufacturing/reclaim industry (GM Air = 48 µg/m 3 , GM Hand-End = 130 µg/sample) and in the job of working with molten BPA-filled wax (GM Air = 43 µg/m 3 , GM Hand-End = 180 µg/sample), and lowest in the phenolic resins industry (GM Air = 0.85 µg/m 3 , GM Hand-End = 0.43 µg/sample) and in the job of flaking phenolic resins (GM AIR = 0.62 µg/m 3 , GM Hand-End = 0.38 µg/sample). Determinants of increased BPA air concentration were industry, handling BPA containers, spilling BPA, and spending ≥50% of the shift in production areas; increasing age was associated with lower air concentrations. BPA hand exposure determinants were influenced by high values for two workers; for all other workers, tasks involving contact with BPA-containing materials and spending ≥50% of the shift in production areas were associated with increased BPA hand levels. Surface wipe BPA levels were significantly lower in

  16. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  17. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  18. Sustainability at BPA 2013

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-12-01

    THIS IS THE THIRD YEAR BPA has reported on sustainability program accomplishments. The report provides an opportunity to review progress made on sustainability initiatives, evaluate how far we have come and how much we can improve. The program has demonstrated maturation as the concepts of sustainability and resource conservation are communicated and understood. The sustainability program started as an employee-driven “grass roots” effort in 2010. Sustainability is becoming a consideration in how work is performed. The establishment of several policies supporting sustainability efforts proves the positive progress being made. In 2009, BPA became a founder and member of The Climate Registry, a nonprofit collaboration that sets standards to calculate, verify and report greenhouse gas emissions. This year, BPA completed and published our Greenhouse Gas inventory for the years of 2009, 2010 and 2011. The 2012 inventory is currently in the process of third-party verification and scheduled for public release in January 2014. These inventories provide a concrete measure of the progress we are making.

  19. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  20. StreamNet; 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River Inter-Tribal Fish Commission

    2000-01-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The views of this report are the author's and do not necessarily represent the views of BPA. This annual report covers progress made by: Columbia River Inter-Tribal Fish Commission Idaho; Department of Fish and Game; Montana Department of Fish, Wildlife and Parks; Oregon Department of Fish and Wildlife; Pacific States Marine Fisheries Commission; Shoshone-Bannock Tribes; US Fish and Wildlife Service; Washington Department of Fish and Wildlife; and FY1999 StreamNet Quickplan.

  1. Neurotoxicity of low bisphenol A (BPA) exposure for young male mice: Implications for children exposed to environmental levels of BPA

    International Nuclear Information System (INIS)

    Zhou, Yuanxiu; Wang, Zhouyu; Xia, Minghan; Zhuang, Siyi; Gong, Xiaobing; Pan, Jianwen; Li, Chuhua; Fan, Ruifang; Pang, Qihua; Lu, Shaoyou

    2017-01-01

    To investigate the neuron toxicities of low-dose exposure to bisphenol A (BPA) in children, mice were used as an animal model. We examined brain cell damage and the effects of learning and memory ability after BPA exposure in male mice (4 weeks of age) that were divided into four groups and chronically received different BPA treatments for 8 weeks. The comet assay and hippocampal neuron counting were used to detect the brain cell damage. The Y-maze test was applied to test alterations in learning and memory ability. Long term potentiation induction by BPA exposure was performed to study the potential mechanism of performance. The percentages of tail DNA, tail length and tail moment in brain cells increased with increasing BPA exposure concentrations. Significant differences in DNA damage were observed among the groups, including between the low-dose and control groups. In the Y-maze test, the other three groups qualified for the learned standard one day earlier than the high-exposed group. Furthermore, the ratio of qualified mice in the high-exposed group was always the lowest among the groups, indicating that high BPA treatment significantly altered the spatial memory performance of mice. Different BPA treatments exerted different effects on the neuron numbers of different regions in the hippocampus. In the CA1 region, the high-exposed group had a significant decrease in neuron numbers. A non-monotonic relationship was observed between the exposure concentrations and neuron quantity in the CA3 region. The hippocampal slices in the control and medium-exposed groups generated long-term potentiation after induction by theta burst stimulation, but the low-exposed group did not. A significant difference was observed between the control and low-exposed groups. In conclusion, chronic exposure to a low level of BPA had adverse effects on brain cells and altered the learning and memory ability of adolescent mice. - Highlights: • Low dose BPA exposure could lead to DNA

  2. Evaluation of Carrying Capacity : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 1 of 4, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Johnson, Gary E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity.

  3. Marion Industrial Substation project

    International Nuclear Information System (INIS)

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines

  4. BPA/Lower Valley transmission project. Final environmental impact statement. Appendix C

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration is investigating the feasibility of constructing an additional transmission line, which for the most part will be adjacent to the existing transmission line. This would require the construction or acquisition of additional access roads, used for routine and emergency maintenance and construction activities. A survey was conducted to map any occurrences of threatened, endangered and sensitivity plant species and weed species along the Swan Valley-Teton Line. This report contains Appendix C

  5. BPA/Lower Valley transmission project. Final environmental impact statement. Appendix F

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration is investigating the feasibility of constructing an additional transmission line, which for the most part will be adjacent to the existing transmission line. This would require the construction or acquisition of additional access roads, used for routine and emergency maintenance and construction activities. A survey was conducted to map any occurrences of threatened, endangered and sensitivity plant species and weed species along the Swan Valley-Teton Line. This report contains Appendix F

  6. Corona performance of a compact 230-kV line

    International Nuclear Information System (INIS)

    Chartier, V.L.; Blair, D.E.

    1994-01-01

    Permitting requirements and the acquisition of new rights-of-way for transmission facilities has in recent years become increasingly difficult for most utilities, including Puget Sound Power and Light Company. In order to maintain a high degree of reliability of service while being responsive to public concerns regarding the siting of high voltage (HV) transmission facilities, Puget Power has found it necessary to more heavily rely upon the use of compact lines in franchise corridors. Compaction does, however, precipitant increased levels of audible noise (AN) and radio and TV interference (RI and TVI) due to corona on the conductors and insulator assemblies. Puget Power relies upon the Bonneville Power Administration (BPA) Corona and Field Effects computer program to calculate AN and RI for new lines. Since there was some question of the program's ability to accurately represent quiet 230-kV compact designs, a joint project was undertaken with BPA to verify the program's algorithms. Long-term measurements made on an operating Puget Power 230-kV compact line confirmed the accuracy of BPA's AN model; however, the RI measurements were much lower than predicted by the BPA computer and other programs. This paper also describes how the BPA computer program can be used to calculate the voltage needed to expose insulator assemblies to the correct electric field in single test setups in HV laboratories

  7. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  8. Environmental Effects of BPA

    Directory of Open Access Journals (Sweden)

    Laura Canesi

    2015-07-01

    Full Text Available Research on bisphenol A (BPA as an environmental contaminant has now major regulatory implications toward the ecosystem health, and hence it is incumbent on scientists to do their research to the highest standards possible, in order that the most appropriate decisions are made to mitigate the impacts to aquatic wildlife. However, the contribution given so far appears rather fragmented. The present overview aims to collect available information on the effects of BPA on aquatic vertebrates and invertebrates to provide a general scenario and to suggest future developments toward more comprehensive approaches useful for aquatic species protection.

  9. Bisphenol A (BPA) in the serum of pet dogs following short-term consumption of canned dog food and potential health consequences of exposure to BPA.

    Science.gov (United States)

    Koestel, Zoe L; Backus, Robert C; Tsuruta, Kaoru; Spollen, William G; Johnson, Sarah A; Javurek, Angela B; Ellersieck, Mark R; Wiedmeyer, Charles E; Kannan, Kurunthachalam; Xue, Jingchuan; Bivens, Nathan J; Givan, Scott A; Rosenfeld, Cheryl S

    2017-02-01

    Bisphenol A (BPA) is a widely present endocrine disruptor chemical found in many household items. Moreover, this chemical can bioaccumulate in various terrestrial and aquatic sources; thereby ensuring continual exposure of animals and humans. For most species, including humans, diet is considered the primary route of exposure. However, there has been little investigation whether commercial-brands of dog foods contain BPA and potential health ramifications of BPA-dietary exposure in dogs. We sought to determine BPA content within dog food, whether short-term consumption of these diets increases serum concentrations of BPA, and potential health consequences, as assessed by potential hematological, serum chemistry, cortisol, DNA methylation, and gut microbiome changes, in dogs associated with short-term dietary exposure to BPA. Fourteen healthy privately-owned dogs were used in this study. Blood and fecal samples were collected prior to dogs being placed for two-weeks on one of two diets (with one considered to be BPA-free), and blood and fecal samples were collected again. Serum/plasma samples were analyzed for chemistry and hematology profiles, cortisol concentrations, 5-methylcytosine in lymphocytes, and total BPA concentrations. Fecal samples were used for microbiome assessments. Both diets contained BPA, and after two-weeks of being on either diet, dogs had a significant increase in circulating BPA concentrations (pre-samples=0.7±0.15ng/mL, post-samples=2.2±0.15ng/mL, pfood increased circulating BPA concentrations in dogs comparable to amounts detected in humans, and greater BPA concentrations were associated with serum chemistry and microbiome changes. Dogs, who share our internal and external environments with us, are likely excellent indicators of potential human health concerns to BPA and other environmental chemicals. These findings may also have relevance to aquatic and terrestrial wildlife. Copyright © 2016 Elsevier B.V. All rights reserved.

  10. Study to Determine the Biological Feasibility of a New Fish Tagging System, 1998-2000 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Downing, Sandra L.

    2001-05-01

    Since 1984, the National Marine Fisheries Service (NMFS) in cooperation with the Bonneville Power Administration (BPA) has conducted an ongoing research and development project to expand and improve technology for Passive-Integrated-Transponder tags (PIT tags) throughout the Columbia River Basin (CRB). Work conducted as part of this project during 1999-2000 was divided into six individual projects, which are covered separately in this report.

  11. Habitat Evaluation Procedures (HEP) Report; Steigerwald Lake National Wildlife Refuge, Technical Report 2000-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Allard, Donna

    2001-09-01

    Steigenvald Lake National Wildlife Refuge (NWR, refuge) was established as a result of the U. S. Army Corps of Engineers (COE) transferring ownership of the Stevenson tract located in the historic Steigerwald Lake site to the U.S. Fish and Wildlife Service (FWS, Service) for the mitigation of the fish and wildlife losses associated with the construction of a second powerhouse at the Bonneville Dam on the Columbia River and relocation of the town of North Bonneville (Public Law 98-396). The construction project was completed in 1983 and resulted in the loss of approximately 577 acres of habitat on the Washington shore of the Columbia River (USFWS, 1982). The COE determined that acquisition and development of the Steigenvald Lake area, along with other on-site project management actions, would meet their legal obligation to mitigate for these impacts (USCOE, 1985). Mitigation requirements included restoration and enhancement of this property to increase overall habitat diversity and productivity. From 1994 to 1999, 317 acres of additional lands, consisting of four tracts of contiguous land, were added to the original refuge with Bonneville Power Administration (BPA) funds provided through the Washington Wildlife Mitigation Agreement. These tracts comprised Straub (191 acres), James (90 acres), Burlington Northern (27 acres), and Bliss (9 acres). Refer to Figure 1. Under this Agreement, BPA budgeted $2,730,000 to the Service for 'the protection, mitigation, and enhancement of wildlife and wildlife habitat that was adversely affected by the construction of Federal hydroelectric dams on the Columbia River or its tributaries' in the state of Washington (BPA, 1993). Lands acquired for mitigation resulting from BPA actions are evaluated using the habitat evaluation procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the Federal Columbia

  12. Facilitation of the Estuary/Ocean Subgroup and the Expert Regional Technical Group, Annual Report for 2015

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-08-01

    This document is the annual report for the period September 1, 2014 through August 31, 2015 for the project—Facilitation of the Estuary/Ocean Subgroup (EOS) and the Expert Regional Technical Group (ERTG). Pacific Northwest National Laboratory (PNNL) conducted the project for the Bonneville Power Administration (BPA). The EOS and ERTG are part of the research, monitoring, and evaluation (RME) and habitat restoration efforts, respectively, developed by the Action Agencies (BPA, U.S. Army Corps of Engineers [Corps or USACE], and U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS) and implemented under the Columbia Estuary Ecosystem Restoration Program (CEERP). BPA/Corps (2015) explain the CEERP and the role of RME and the ERTG. For the purposes of this report, the lower Columbia River and estuary (LCRE) includes the floodplain from Bonneville Dam down through the lower river and estuary into the river’s plume in the ocean. The main purpose of this project is to facilitate EOS and ERTG meetings and work products. Other purposes are to provide technical support for CEERP adaptive management, CEERP restoration design challenges, and tributary RME. From 2002 through 2008, the EOS worked to design the federal RME program for the estuary/ocean (Johnson et al. 2008). From 2009 to the present day, EOS activities have involved RME implementation; however, EOS activities were minimal during the current reporting period. PNNL provided technical support to CEERP’s adaptive management process by convening 1.2 meetings of the Action Agencies (AAs) and drafting material for the “CEERP 2015 Restoration and Monitoring Plan” (BPA/Corps 2015).

  13. Presence and leaching of bisphenol a (BPA) from dental materials

    Science.gov (United States)

    Becher, Rune; Wellendorf, Hanne; Sakhi, Amrit Kaur; Samuelsen, Jan Tore; Thomsen, Cathrine; Bølling, Anette Kocbach; Kopperud, Hilde Molvig

    2018-01-01

    Abstract BPA has been reported to leach from some resin based dental restorative materials and materials used for orthodontic treatment. To confirm and update previous findings, especially in light of the new temporary lower threshold value for tolerable daily BPA intake, we have investigated the leaching of BPA from 4 composite filling materials, 3 sealants and 2 orthodontic bonding materials. The materials were either uncured and dissolved in methanol or cured. The cured materials were kept in deionized water for 24 hours or 2 weeks. Samples were subsequently analyzed by ultra-performance liquid chromatography coupled to mass spectrometry (UPLC-MS-MS). The composite filling material Tetric EvoFlow® and the fissure sealant DELTON® showed significantly higher levels of BPA leaching compared to control samples for all test conditions (uncured, 24 h leaching and 2 weeks leaching). There were no significant differences in amount of leached BPA for any of the tested materials after 24 hours compared to 2 weeks. These results show that BPA is still released from some dental materials despite the general concern about potential adverse effects of BPA. However, the amounts of BPA were relatively low and most likely represent a very small contribution to the total BPA exposure. PMID:29868625

  14. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  15. Longview District Operations and Maintenance Headquarters: Environmental assessment

    International Nuclear Information System (INIS)

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives

  16. Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY09 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.

    2009-10-22

    This document is the annual report for fiscal year 2009 (FY09) for the project called Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers [Corps or USACE], U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS).

  17. [Research on characteristic of interrelationship between toxic organic compound BPA and Chlorella vulgaris].

    Science.gov (United States)

    Chen, Shan-Jia; Chen, Xiu-Rong; Yan, Long; Zhao, Jian-Guo; Zhang, Fei; Jiang, Zi-Jian

    2014-04-01

    The effects of different concentrations of bisphenol A (BPA) on Chlorella vulgaris and removal capacity of BPA by Chlorella vulgaris were investigated. Results showed that a low concentration (0-20 mg x L(-1)) of BPA promoted the growth of Chlorella vulgaris, whereas a relative high concentration (20-50 mg x L(-1)) of BPA inhibited the growth of Chlorella vulgaris, and the inhibition effect was positively correlated with the concentration of BPA. Likewise, a high dose of initial BPA (> 20 mg x L(-1)) led to a decline in the content of chlorephyll a. Chlorella vulgaris had BPA removal capacity when initial BPA concentration ranged from 2 mg x L(-1) to 50 mg x L(-1). There was positive correlation between the removal rate of BPA per cell and initial BPA concentration. The removal rate of BPA was the highest when initial BPA was 50 mg x L(-1), which appeared between lag phase and logarithmic phase.

  18. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence

  19. Computational fluid dynamics simulations of the Late Pleistocene Lake Bonneville flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-01-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s−1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y−1 Pa−1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the

  20. Computational Fluid Dynamics simulations of the Late Pleistocene Lake Bonneville Flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-06-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s-1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y-1 Pa-1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the outflow to grow from 10

  1. Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes -- Habitat for Humanity The Woods

    Energy Technology Data Exchange (ETDEWEB)

    Lubliner, Michael [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Howard, Luke [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Hales, David [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Kunkle, Rick [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Gordon, Andy [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Spencer, Melinda [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program

    2016-02-18

    The Woods is a Habitat for Humanity (HFH) community of ENERGY STAR Homes Northwest (ESHNW)-certified homes located in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report, and includes significant billing analysis and cost effectiveness research from a collaborative, ongoing Ductless Heat Pump (DHP)research effort for Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH. Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH.

  2. Hood River Production Program Review, Final Report 1991-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Underwood, Keith; Chapman, Colin; Ackerman, Nicklaus

    2003-12-01

    This document provides a comprehensive review of Bonneville Power Administration (BPA) funded activities within the Hood River Basin from 1991 to 2001. These activities, known as the Hood River Production Program (HRPP), are intended to mitigate for fish losses related to operation of federal dams in the Columbia River Basin, and to contribute to recovery of endangered and/or threatened salmon and steelhead, as directed by Nation Oceanic and Atmospheric Administration - Fisheries (NOAA Fisheries). The Environmental Impact Statement (EIS) for the HRPP, which authorized BPA to fund salmon and steelhead enhancement activities in the Hood River Basin, was completed in 1996 (BPA 1996). The EIS specified seven years of monitoring and evaluation (1996-2002) after program implementation to determine if program actions needed modification to meet program objectives. The EIS also called for a program review after 2002, that review is reported here.

  3. Biomonitoring Equivalents for bisphenol A (BPA).

    Science.gov (United States)

    Krishnan, Kannan; Gagné, Michelle; Nong, Andy; Aylward, Lesa L; Hays, Sean M

    2010-10-01

    Recent efforts worldwide have resulted in a growing database of measured concentrations of chemicals in blood and urine samples taken from the general population. However, few tools exist to assist in the interpretation of the measured values in a health risk context. Biomonitoring Equivalents (BEs) are defined as the concentration or range of concentrations of a chemical or its metabolite in a biological medium (blood, urine, or other medium) that is consistent with an existing health-based exposure guideline. BE values are derived by integrating available data on pharmacokinetics with existing chemical risk assessments. This study reviews available health-based exposure guidance values for bisphenol A (BPA) from Health Canada, the United States Environmental Protection Agency (USEPA) and the European Food Safety Authority (EFSA). BE values were derived based on data on BPA urinary excretion in humans. The BE value corresponding to the oral provisional tolerable daily intake (pTDI) of 25 microg/kg-d from Health Canada is 1mg/L (1.3mg/g creatinine); value corresponding to the US EPA reference dose (RfD) and EFSA tolerable daily intake (TDI) estimates (both of which are equal to 50 microg/kg-d) is 2mg/L (2.6 mg/g creatinine). These values are estimates of the 24-h average urinary BPA concentrations that are consistent with steady-state exposure at the respective exposure guidance values. These BE values may be used as screening tools for evaluation of central tendency measures of population biomonitoring data for BPA in a risk assessment context and can assist in prioritization of the potential need for additional risk assessment efforts for BPA relative to other chemicals. Copyright (c) 2010 Elsevier Inc. All rights reserved.

  4. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  5. 1985 consumer segmentation: Assessment of the market for conservation in the Northwest: Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, B.M.; Hattrup, M.P.; Nordi, R.T.; Shankle, S.A.; Ivey, D.L.

    1987-05-01

    This report presents information on consumer attitudes toward conservation, past and intended conservation behaviors, and utility-sponsored conservation program participation levels. The information was collected by means of random telephone surveys of households in Idaho, Oregon, Washington, and Western Montana. Pacific Northwest Laboratory (PNL) conducted analyses of the survey results for the Bonneville Power Administration (BPA) to obtain a better understanding of consumer attitudes and behaviors and to facilitate conservation program planning, design, and marketing.

  6. BPA uptake in rat tissues after partial hepatectomy

    Energy Technology Data Exchange (ETDEWEB)

    Slatkin, D.N.; Nawrocky, M.M.; Coderre, J.A.; Fisher, C.D.; Joel, D.D.; Lombardo, D.T.; Micca, P.L.

    1996-12-31

    In boron neutron capture therapy (BNCT), boron given as boronophenylalanine (BPA) accumulates transiently not only in tumors but also in normal tissues. Average boron concentrations in transplanted 9L gliosarcoma tumors of 20 rats were 2.5 to 3.7 times concentrations found in blood. Although boron levels in a variety of tissues were also higher than blood the concentrations were less than the lowest found in the tumor. Further note than although BPA is a structural analogue of phenylalanine (Phe), the pathway of BPA uptake into regenerating liver may not be linked to Phe uptake mechanisms.

  7. Sustaining the Northwest way of life

    International Nuclear Information System (INIS)

    1991-08-01

    These Discussion Papers are from a number of organizations with a high stake in the future performance of the Bonneville Power Administration. Bonneville solicited papers from other organizations to assure a broaded-based discussion of the topics for the 1991 Programs in Perspective. PIP meetings will be held throughout the Northwest in September. PIP runs on a two-year cycle. The first year is aimed at discussion of broad, strategic issues. The second year evaluates specific program levels for all Bonneville programs and test them for affordability against financial constraints. This year's PIP focuses on strategic-issues discussion. It specifically asks for regional discussion to help put some flesh on the skeleton of Bonneville's own vision for its future: ''Best for the Northwest Through Teamwork B... P... A... The Most Competitive and Socially Responsible Power System in the Nation'' Specific topics are (1) achieving social responsibility and (2) conserving Northwest competitiveness. Bonneville executives chose this vision as a means of directing the organization into and beyond the 1990s. It guides the 3000 plus employees of the agency in their day-to-day operations. By asking for discussion of the terms ''Most Competitive'' and ''Socially Responsible'' in the 1991 PIP, Bonneville intends to better understand the diverse needs of its customers and constituents, and to become of even greater service to the Northwest. The papers are designed to help stimulate thought about the dimensions of the future direction of BPA. Bonneville intends that the real substance of PIP will occur in the meetings themselves. We hope that these papers will provoke new thinking, and that the interchange of views in the meetings will produce new approaches to the issues

  8. The judgement of simultaneous commutation failure in HVDC about hierarchical connection to AC grid

    Science.gov (United States)

    Li, Ming; Song, Xinli; Huang, Daoshan; Liu, Wenzhuo; Zhao, Shutao; Ye, Xiaohui; Meng, Hang

    2017-09-01

    The hierarchical connection to AC grid at inverter sides in UHVDC has been take in several projects. This paper introduced the frame of the connection mode in hierarchical access system and compared it with the traditional one at the case of HVDC-Cigre. Then the criterion of commutation failure according to the same valves current was deduced. In order to verify the accuracy of the criterion, this paper used PSD-BPA (Bonneville Power Administration) to simulate the setting voltage drop in the East China power grid and certified the correctness of the formula.

  9. Hydraulic alterations resulting from hydropower development in the Bonneville Reach of the Columbia River

    Science.gov (United States)

    Hatten, James R.; Batt, Thomas R.

    2010-01-01

    We used a two-dimensional (2D) hydrodynamic model to simulate and compare the hydraulic characteristics in a 74-km reach of the Columbia River (the Bonneville Reach) before and after construction of Bonneville Dam. For hydrodynamic modeling, we created a bathymetric layer of the Bonneville Reach from single-beam and multi-beam echo-sounder surveys, digital elevation models, and navigation surveys. We calibrated the hydrodynamic model at 100 and 300 kcfs with a user-defined roughness layer, a variable-sized mesh, and a U.S. Army Corps of Engineers backwater curve. We verified the 2D model with acoustic Doppler current profiler (ADCP) data at 14 transects and three flows. The 2D model was 88% accurate for water depths, and 77% accurate for velocities. We verified a pre-dam 2D model run at 126 kcfs using pre-dam aerial photos from September 1935. Hydraulic simulations indicated that mean water depths in the Bonneville Reach increased by 34% following dam construction, while mean velocities decreased by 58%. There are numerous activities that would benefit from data output from the 2D model, including biological sampling, bioenergetics, and spatially explicit habitat modeling.

  10. Power Lines and Crops Can Be Good Neighbors

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-08-01

    Two of the Pacific Northwest’s greatest economic assets are its wealth of agriculture and its clean and reliable electricity fueled largely by hydropower. Sometimes the two intersect. Transmission lines carrying electricity to the region’s farms, businesses and homes must, of necessity, span large areas where people grow crops and orchards. To ensure a safe and reliable flow of electricity across these expanses, trees and other vegetation must be managed to certain standards. At the same time, the Bonneville Power Administration — which owns and operates three-quarters of the region’s high-voltage transmission — recognizes the importance of our region’s agricultural bounty. We are committed to working with individuals and agricultural communities to facilitate ongoing land-use activities in transmission rights-of-way as long as those uses are compatible with transmission safety and reliability standards. Our goal with vegetation management is to keep you and your property safe while protecting the reliability of our region’s electricity system. By working together, BPA and landowners can protect the system and public safety.

  11. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  12. Evidence that bisphenol A (BPA) can be accurately measured without contamination in human serum and urine, and that BPA causes numerous hazards from multiple routes of exposure

    Science.gov (United States)

    vom Saal, Frederick S.; Welshons, Wade V.

    2016-01-01

    There is extensive evidence that bisphenol A (BPA) is related to a wide range of adverse health effects based on both human and experimental animal studies. However, a number of regulatory agencies have ignored all hazard findings. Reports of high levels of unconjugated (bioactive) serum BPA in dozens of human biomonitoring studies have also been rejected based on the prediction that the findings are due to assay contamination and that virtually all ingested BPA is rapidly converted to inactive metabolites. NIH and industry-sponsored round robin studies have demonstrated that serum BPA can be accurately assayed without contamination, while the FDA lab has acknowledged uncontrolled assay contamination. In reviewing the published BPA biomonitoring data, we find that assay contamination is, in fact, well controlled in most labs, and cannot be used as the basis for discounting evidence that significant and virtually continuous exposure to BPA must be occurring from multiple sources. PMID:25304273

  13. Characteristics of BPA removal from water by PACl-Al13 in coagulation process.

    Science.gov (United States)

    Xiaoying, Ma; Guangming, Zeng; Chang, Zhang; Zisong, Wang; Jian, Yu; Jianbing, Li; Guohe, Huang; Hongliang, Liu

    2009-09-15

    This paper discussed the coagulation characteristics of BPA with polyaluminum chloride (PACl-Al(13)) as coagulant, examined the impact of coagulation pH, PACl-Al(13) dosage, TOC (total organic carbon) and turbidity on BPA removal, and analyzed the possible dominant mechanisms in water coagulation process. Formation and performance of flocs during coagulation processes were monitored using photometric dispersion analyzer (PDA). When the concentration of humic acid matters and turbidity was low in the solution, the experimental results showed that the removal of BPA experienced increase and subsequently decrease with the PACl-Al(13) dosage increasing. The optimal PACl-Al(13) dosage was found at BPA/PACl-Al(13)=1:2.6(M/M) under our experiment conditions. Results show that the maximum BPA removal efficiency occurred at pH 9.0 due to the adsorption by Al(13) aggregates onto BPA rather than charge neutralization mechanism by polynuclear aluminous salts in the solution. The humic acid matters and kaolin in the solution have significant effect on BPA removal with PACl-Al(13) in the coagulation. The BPA removal will be weakened at high humic matters. The removal rate of BPA increased and subsequently decreased with the turbidity increasing.

  14. Status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam, annual progress report, July 1986 - March 1987.; ANNUAL

    International Nuclear Information System (INIS)

    Oregon Department of Fish and Wildlife; Washington Department of Fisheries

    1987-01-01

    Measure 804(e)(8) of the Northwest Power Planning Council (NPPC) Fish and Wildlife Program states that Bonneville Power Administration (BPA) ''shall fund research to determine the impacts of development and operation of the hydroelectric power system on sturgeon in the Columbia River Basin...'' In June 1985, BPA sponsored a workshop to define and list in priority order research needs in the basin (Fickeisen 1985a). In December 1985, BPA submitted a research program implementation plan (Fickeisen 1985b) to the NPPC. The purpose of the plan is to provide guidance for conducting research necessary to address four objectives identified by regional fishery interests for protecting, mitigating and enhancing white sturgeon populations in the Columbia River basin. The plan's objectives are: (1) Assess the current status of Columbia River basin white sturgeon stocks. (2) Provide the basis to evaluate the need for protection, mitigation and enhancement of white sturgeon in the Columbia River system. (3) Provide information that can be used to evaluate potential methods of protection, mitigation and enhancement of existing stocks. (4) Provide tools to assess the effectiveness of protection, mitigation and enhancement efforts

  15. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1986-1987 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McCabe, Jr., George T. (National Marine Fisheries Service, Environmental and Technical Services Division, Portland, OR); Beckman, Lance G. (US Fish and Wildlife Service, Portland, OR); Kreitman, Gayle (Washington Department of Fisheries, Olympia, WA)

    1987-06-01

    Measure 804(e)(8) of the Northwest Power Planning Council (NPPC) Fish and Wildlife Program states that Bonneville Power Administration (BPA) ''shall fund research to determine the impacts of development and operation of the hydroelectric power system on sturgeon in the Columbia River Basin...'' In June 1985, BPA sponsored a workshop to define and list in priority order research needs in the basin (Fickeisen 1985a). In December 1985, BPA submitted a research program implementation plan (Fickeisen 1985b) to the NPPC. The purpose of the plan is to provide guidance for conducting research necessary to address four objectives identified by regional fishery interests for protecting, mitigating and enhancing white sturgeon populations in the Columbia River basin. The plan's objectives are: (1) Assess the current status of Columbia River basin white sturgeon stocks. (2) Provide the basis to evaluate the need for protection, mitigation and enhancement of white sturgeon in the Columbia River system. (3) Provide information that can be used to evaluate potential methods of protection, mitigation and enhancement of existing stocks. (4) Provide tools to assess the effectiveness of protection, mitigation and enhancement efforts.

  16. Sustaining the Northwest Way of Life.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration. Customer Services.

    1991-08-01

    These Discussion Papers are from a number of organizations with a high stake in the future performance of the Bonneville Power Administration. Bonneville solicited papers from other organizations to assure a broaded-based discussion of the topics for the 1991 Programs in Perspective. PIP meetings will be held throughout the Northwest in September. PIP runs on a two-year cycle. The first year is aimed at discussion of broad, strategic issues. The second year evaluates specific program levels for all Bonneville programs and test them for affordability against financial constraints. This year's PIP focuses on strategic-issues discussion. It specifically asks for regional discussion to help put some flesh on the skeleton of Bonneville's own vision for its future: Best for the Northwest Through Teamwork B... P... A... The Most Competitive and Socially Responsible Power System in the Nation'' Specific topics are (1) achieving social responsibility and (2) conserving Northwest competitiveness. Bonneville executives chose this vision as a means of directing the organization into and beyond the 1990s. It guides the 3000 plus employees of the agency in their day-to-day operations. By asking for discussion of the terms Most Competitive'' and Socially Responsible'' in the 1991 PIP, Bonneville intends to better understand the diverse needs of its customers and constituents, and to become of even greater service to the Northwest. The papers are designed to help stimulate thought about the dimensions of the future direction of BPA. Bonneville intends that the real substance of PIP will occur in the meetings themselves. We hope that these papers will provoke new thinking, and that the interchange of views in the meetings will produce new approaches to the issues.

  17. Supplement Analysis for the Transmission System Vegetation Management Program (DOE/EIS-0285/SA-113-1) Updates 9/27/02 SA-113 - Big Eddy-Ostrander Transmission Corridor

    Energy Technology Data Exchange (ETDEWEB)

    Hutchinson, Kenneth [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-12-02

    To perform remedial vegetation management for keeping vegetation a safe distance away from electric power facilities and controlling noxious weeds within a section of BPA's Big Eddy-Ostrander Transmission Corridor. During a site review conducted in late fall of 2001, the inspector observed various species of hardwood trees resprouted from stumps. The new vegetative growth encroached on the required “Minimum Safe Distance” between the top of vegetation and the conductor cables. The management action is necessary to reduce the current and potential future hazards that tall-growing vegetation poses to transmission conductors. In addition, BPA will include weed control as part of their remedial vegetation management action. Noxious weeds occur within the corridor. Under a 1999 Executive Order, all federal agencies are required to detect and control noxious weeds. In addition, BPA is required under the 1990 amendment to the Noxious Weed Act (7 USC 2801-2814) to manage undesirable plants on federal land. Also, the Bonneville Power Administration (BPA) has responsibility to manage noxious weeds under the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS).1 State statutes and regulations also mandate action by BPA and the USFS to control noxious weeds. The Oregon Department of Agriculture (ODA) has requested that agencies aggressively control these weeds before additional spread occurs.

  18. Business plan in brief. Draft

    International Nuclear Information System (INIS)

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization

  19. 1993 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 2, Book 1, Energy.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-12-01

    The 1993 Pacific Northwest Loads and Resources Study establishes the Bonneville Power Administration`s (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this technical appendix detailing loads and resources for each major Pacific and Northwest generating utility, (2) a summary of Federal system and Pacific Northwest region loads and resources, and (3) a technical appendix detailing forecasted Pacific Northwest economic trends and loads. This analysis updates the 1992 Pacific Northwest Loads and Resources Study Technical Appendix published in December 1992. This technical appendix provides utility-specific information that BPA uses in its long-range planning. It incorporates the following for each utility (1) Electrical demand firm loads; (2) Generating resources; and (3) Contracts both inside and outside the region. This document should be used in combination with the 1993 Pacific Northwest Loads and Resources Study, published in December 1993, because much of the information in that document is not duplicated here.

  20. Stability of bisphenol A (BPA) in oil-in water emulsions under riboflavin photosensitization.

    Science.gov (United States)

    Jang, Eun Yeong; Park, Chan Uk; Kim, Mi-Ja; Lee, JaeHwan

    2012-08-01

    Effects of riboflavin photosensitization on the degradation of bisphenol A (BPA) were determined in oil-in-water (O/W) emulsions containing ethylenediaminetetraacetic acid (EDTA) or sodium azide, which are a metal chelator or a singlet oxygen quencher, respectively. Also, the distribution of BPA between the continuous and dispersed phases in O/W emulsions was analyzed by high-performance liquid chromatography (HPLC). The concentration of BPA in O/W emulsions significantly decreased by 38.6% after 2 h under visible light irradiation and in the presence of riboflavin (P riboflavin photosensitization (P riboflavin photodegradation in O/W emulsions. Concentration of BPA, an endocrine disrupting chemical, was decreased significantly in oil-in-water emulsions under riboflavin and visible light irradiation. BPA in continuous aqueous phase was major target of riboflavin photosensitization. However, BPA was distributed more densely in lipid phase and more protected from riboflavin photosensitized O/W emulsions. This study can help to decrease the level of BPA in foods made of O/W emulsions containing riboflavin, which could be displayed under visible light irradiation. © 2012 Institute of Food Technologists®

  1. Superconducting magnetic energy storage (SMES) program, January 1-December 31, 1981

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1982-02-01

    Work reported is on the development of a 30 MJ superconducting magnetic energy storage (SMES) unit for use by the Bonneville Power Administration (BPA) to stabilize power oscillations on their Pacific AC Intertie. The 30 MJ superconducting coil manufacture was completed. Design of the seismic mounting of the coil to the nonconducting dewar lid and a concrete foundation is complete. The superconducting application VAR (SAVAR) control study indicated a low economic advantage and the SAVAR program was terminated. An economic and technological evaluation of superconducting fault current limiter (SFCL) was completed and the results are reported

  2. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  3. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  4. From BPA to its analogues: Is it a safe journey?

    Science.gov (United States)

    Usman, Afia; Ahmad, Masood

    2016-09-01

    Bisphenol-A (BPA) is one of the most abundant synthetic chemicals in the world due to its uses in plastics. Its widespread exposure vis-a-vis low dose effects led to a reduction in its safety dose and imposition of ban on its use in infant feeding bottles. This restriction paved the way for the gradual market entry of its analogues. However, their structural similarity to BPA has put them under surveillance for endocrine disrupting potential. The application of these analogues is increasing and so are the studies reporting their toxicity. This review highlights the reasons which led to the ban of BPA and also reports the exposure and toxicological data available on its analogues. Hence, this compilation is expected to answer in a better way whether the replacement of BPA by these analogues is safer or more harmful? Copyright © 2016. Published by Elsevier Ltd.

  5. Developmental exposure to bisphenol A (BPA) alters sexual differentiation in painted turtles (Chrysemys picta)

    Science.gov (United States)

    Jandegian, Caitlin M.; Deem, Sharon L.; Bhandari, Ramji K.; Holliday, Casey M.; Nicks, Diane; Rosenfeld, Cheryl S.; Selcer, Kyle; Tillitt, Donald E.; vom Saal, Fredrick S.; Velez, Vanessa; Yang, Ying; Holliday, Dawn K.

    2015-01-01

    Environmental chemicals can disrupt endocrine signaling and adversely impact sexual differentiation in wildlife. Bisphenol A (BPA) is an estrogenic chemical commonly found in a variety of habitats. In this study, we used painted turtles (Chrysemys picta), which have temperature-dependent sex determination (TSD), as an animal model for ontogenetic endocrine disruption by BPA. We hypothesized that BPA would override TSD and disrupt sexual development. We incubated farm-raised turtle eggs at the male-producing temperature (26 °C), randomly assigned individuals to treatment groups: control, vehicle control, 17β-estradiol (E2, 20 ng/g-egg) or 0.01, 1.0, 100 μg BPA/g-egg and harvested tissues at hatch. Typical female gonads were present in 89% of the E2-treated “males”, but in none of the control males (n = 35). Gonads of BPA-exposed turtles had varying amounts of ovarian-like cortical (OLC) tissue and disorganized testicular tubules in the medulla. Although the percentage of males with OLCs increased with BPA dose (BPA-low = 30%, BPA-medium = 33%, BPA-high = 39%), this difference was not significant (p = 0.85). In all three BPA treatments, SOX9 patterns revealed disorganized medullary testicular tubules and β-catenin expression in a thickened cortex. Liver vitellogenin, a female-specific liver protein commonly used as an exposure biomarker, was not induced by any of the treatments. Notably, these results suggest that developmental exposure to BPA disrupts sexual differentiation in painted turtles. Further examination is necessary to determine the underlying mechanisms of sex reversal in reptiles and how these translate to EDC exposure in wild populations.

  6. Exposure assessment to bisphenol A (BPA) in Portuguese children by human biomonitoring.

    Science.gov (United States)

    Correia-Sá, Luísa; Kasper-Sonnenberg, Monika; Schütze, André; Pälmke, Claudia; Norberto, Sónia; Calhau, Conceição; Domingues, Valentina F; Koch, Holger M

    2017-12-01

    Exposure to bisphenol A (BPA) is known to be widespread and available data suggests that BPA can act as an endocrine disruptor. Diet is generally regarded as the dominant BPA exposure source, namely through leaching to food from packaging materials. The aim of this study was to evaluate the exposure of 110 Portuguese children (4-18 years old), divided in two groups: the regular diet group (n = 43) comprised healthy normal weight/underweight children with no dietary control; the healthy diet group (n = 67) comprised children diagnosed for obesity/overweight (without other known associated diseases) that were set on a healthy diet for weight control. First morning urine samples were collected and total urinary BPA was analyzed after enzymatic hydrolysis via on-line HPLC-MS/MS with isotope dilution quantification. Virtually, all the children were exposed to BPA, with 91% of the samples above the LOQ (limit of quantification) of 0.1 μg/L. The median (95th percentile) urinary BPA levels for non-normalized and creatinine-corrected values were 1.89 μg/L (16.0) and 1.92 μg/g creatinine (14.4), respectively. BPA levels in the regular diet group were higher than in the healthy diet group, but differences were not significant. Calculated daily BPA intakes, however, were significantly higher in children of the regular diet group than in children of healthy diet group. Median (95th percentile) daily intakes amounted to 41.6 (467) ng/kg body weight/day in the regular diet group, and 23.2 (197) ng/kg body weight/day in the healthy diet group. Multiple logistic regression analysis revealed that children in the healthy diet group had 33% lower intakes than children in the regular diet group (OR 0.67; 95% CI 0.51-0.89). For both groups, however, urinary BPA levels and daily BPA intakes were within the range reported for other children's populations and were well below health guidance values such as the European Food Safety Authority (EFSA) temporary tolerable daily intake

  7. Molecular analysis of the apoptotic effects of BPA in acute myeloid leukemia cells

    Directory of Open Access Journals (Sweden)

    Del Pozzo Giovanna

    2009-06-01

    Full Text Available Abstract Background: BPA (bisphenol A or 2,2-bis(4-hydroxy-phenolpropane is present in the manufacture of polycarbonate plastic and epoxy resins, which can be used in impact-resistant safety equipment and baby bottles, as protective coatings inside metal food containers, and as composites and sealants in dentistry. Recently, attention has focused on the estrogen-like and carcinogenic adverse effects of BPA. Thus, it is necessary to investigate the cytotoxicity and apoptosis-inducing activity of this compound. Methods: Cell cycle, apoptosis and differentiation analyses; western blots. Results: BPA is able to induce cell cycle arrest and apoptosis in three different acute myeloid leukemias. Although some granulocytic differentiation concomitantly occurred in NB4 cells upon BPA treatment, the major action was the induction of apoptosis. BPA mediated apoptosis was caspase dependent and occurred by activation of extrinsic and intrinsic cell death pathways modulating both FAS and TRAIL and by inducing BAD phosphorylation in NB4 cells. Finally, also non genomic actions such as the early decrease of both ERK and AKT phosphorylation were induced by BPA thus indicating that a complex intersection of regulations occur for the apoptotic action of BPA. Conclusion: BPA is able to induce apoptosis in leukemia cells via caspase activation and involvement of both intrinsic and extrinsic pathways of apoptosis.

  8. Business Case for Nonintrusive Load Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hao, He [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-05-01

    This report explores how utilities, researchers, and consumers could benefit from a lower cost approach to submetering using non-intrusive load monitoring (NILM). NILM is a process of using data from a single point of monitoring, such as a utility smart meter, to provide an itemized accounting of end use energy consumption in residential and small commercial buildings. Pacific Northwest National Laboratory (PNNL) prepared this report for the Bonneville Power Administration (BPA). PNNL participated in an advisory group as part of a research project sponsored by the U.S. Department of Energy (DOE), the Bonneville Power Administration, and the State of Washington. The Electric Power Research Institute (EPRI) convened the advisory committee for two workshops held to identify ways in which NILM may be used. PNNL, on behalf of DOE, helped to cosponsor the first of these workshops. Results of an end-use monitoring study of a bank branch conducted by PNNL are also presented for purposes of illustrating the need for better data in energy savings modeling (DOE 2013a).

  9. Information retrieval system: impacts of water-level changes on uses of federal storage reservoirs of the Columbia River.

    Energy Technology Data Exchange (ETDEWEB)

    Fickeisen, D.H.; Cowley, P.J.; Neitzel, D.A.; Simmons, M.A.

    1982-09-01

    A project undertaken to provide the Bonneville Power Administration (BPA) with information needed to conduct environmental assessments and meet requirements of the National Environmental Policy Act (NEPA) and the Pacific Northwest Electric Power Planning and Conservation Act (Regional Act) is described. Access to information on environmental effects would help BPA fulfill its responsibilities to coordinate power generation on the Columbia River system, protect uses of the river system (e.g., irrigation, recreation, navigation), and enhance fish and wildlife production. Staff members at BPA identified the need to compile and index information resources that would help answer environmental impact questions. A computer retrieval system that would provide ready access to the information was envisioned. This project was supported by BPA to provide an initial step toward a compilation of environmental impact information. Scientists at Pacific Northwest Laboratory (PNL) identified, gathered, and evaluated information related to environmental effects of water level on uses of five study reservoirs and developed and implemented and environmental data retrieval system, which provides for automated storage and retrieval of annotated citations to published and unpublished information. The data retrieval system is operating on BPA's computer facility and includes the reservoir water-level environmental data. This project was divided into several tasks, some of which were conducted simultaneously to meet project deadlines. The tasks were to identify uses of the five study reservoirs, compile and evaluate reservoir information, develop a data entry and retrieval system, identify and analyze research needs, and document the data retrieval system and train users. Additional details of the project are described in several appendixes.

  10. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  11. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  12. Extensive metabolism and route-dependent pharmacokinetics of bisphenol A (BPA) in neonatal mice following oral or subcutaneous administration

    International Nuclear Information System (INIS)

    Draganov, Dragomir I.; Markham, Dan A.; Beyer, Dieter; Waechter, John M.; Dimond, Stephen S.; Budinsky, Robert A.; Shiotsuka, Ronald N.; Snyder, Stephanie A.; Ehman, Kimberly D.; Hentges, Steven G.

    2015-01-01

    Orally administered bisphenol A (BPA) undergoes efficient first-pass metabolism to produce the inactive conjugates BPA-glucuronide (BPA-G) and BPA-sulfate (BPA-S). This study was conducted to evaluate the pharmacokinetics of BPA, BPA-G and BPA-S in neonatal mice following the administration of a single oral or subcutaneous (SC) dose. This study consisted of 3 phases: (1) mass-balance phase in which effective dose delivery procedures for oral or SC administration of 3 H-BPA to postnatal day three (PND3) mice were developed; (2) pharmacokinetic phase during which systemic exposure to total 3 H-BPA-derived radioactivity in female PND3 mice was established; and (3) metabolite profiling phase in which 50 female PND3 pups received either a single oral or SC dose of 3 H-BPA. Blood was collected from 5 pups/route/time-point at various times post-dosing, the blood plasma samples were pooled by group, and time-point and samples were profiled by HPLC with fraction collection. Fractions were analyzed for total radioactivity and data used to reconstruct radiochromatograms and to integrate individual peaks. The identity of the BPA, BPA-G, and BPA-S peaks was confirmed using authentic standards and LC–MS/MS analysis. The result of this study revealed that female PND3 mice have the capacity to metabolize BPA to BPA-G, BPA-S and other metabolites after both routes of administration. Systemic exposure to free BPA is route-dependent as the plasma concentrations were lower following oral administration compared to SC injection

  13. Superconducting magnetic energy storage (SMES) program. Progress report, January 1-December 31, 1982

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1983-05-01

    Work reported is on the development of a 30 MJ superconducting magnetic energy storage (SMES) unit, its installation at the Bonneville Power Administration (BPA) Tacoma Substation, and the preliminary site tests in preparation for its use to stabilize power oscillations on the BPA Pacific AC Inertie. The seismic mounting of the 30 MJ superconducting coil to the dewar lid was completed. The manufacture and testing of the nonconducting dewar were completed. The 5 kV vapor cooled leads were assembled and tested. The refrigerator was placed in operation at the Tacoma Substation and tested by making liquid helium in a 500 l dewar. The refrigerator was connected to the coil dewar and is now used for cooling the 30 MJ coil and dewar with extended purification of the circulating helium to remove contaminants. All equipment was shipped and installed at the BPA Tacoma Substation. Assembly of the 30 MJ coil into the nonconducting dewar was done at the BPA Covington facility and transported to the Tacoma Substation. Substation preparation was completed by 11-1-82. BPA, at considerable expense, did an excellent job preparing the site and assisting with the SMES unit installation. All equipment is in place and operable except for components of the computer control and for full refrigeration of the 30 MJ coil. The converter was tested with the output shorted with the input transformers connected to the 13.8 kV. A new schedule for the SMES operation was established

  14. Saying Goodbye to 'Bonneville' Crater

    Science.gov (United States)

    2004-01-01

    [figure removed for brevity, see original site] Annotated Image NASA's Mars Exploration Rover Spirit took this panoramic camera image on sol 86 (March 31, 2004) before driving 36 meters (118 feet) on sol 87 toward its future destination, the Columbia Hills. This is probably the last panoramic camera image that Spirit will take from the high rim of 'Bonneville' crater, and provides an excellent view of the ejecta-covered path the rover has journeyed thus far. The lander can be seen toward the upper right of the frame and is approximately 321 meters (1060 feet) away from Spirit's current location. The large hill on the horizon is Grissom Hill. The Colombia Hills, located to the left, are not visible in this image.

  15. [Substance monograph on bisphenol A (BPA) - reference and human biomonitoring (HBM) values for BPA in urine. Opinion of the Human Biomonitoring Commission of the German Federal Environment Agency (UBA)].

    Science.gov (United States)

    2012-09-01

    Bisphenol A (BPA) is used for the production of polycarbonates and synthetic resins. Many of the items that contain BPA, for example polycarbonate bottles and coated cans, are commodities from which BPA can migrate into food and drinks, resulting in ubiquitous exposure of the population. Numerous animal studies and in vitro tests have shown that BPA acts as an "endocrine disruptor". Because of the still incomplete understanding of the complex and contradictory effects of BPA at doses below the NOAEL, the toxicological significance of recent findings is uncertain. The German HBM Commission takes notice that the risk assessment is currently in flux and that in the EU and other countries precautionary bans on BPA have been introduced. In the light of the extensive and growing body of literature, the Commission does not see itself in a position to resolve this controversy, nor to answer the question of the relevance of observed effects of low BPA doses on human health. The Commission has derived reference values (RV95) and TDI-based HBM I values for total BPA in urine. The RV95 values are 30 μg/l for 3-5 year olds, 15 μg/l for 6-14 year olds, and 7 μg/l for 20-29 year olds. The HBM I value for children is 1.5 mg/l and 2.5 mg/l for adults, respectively. The Commission emphasizes that the HBM values will require immediate adjustment should the current TDI of 0.05 mg/kg bw/day be changed. For the practical application of HBM, the Commission recommends an assessment based on the RV95. Confirmed exceedance of the RV95 by repeat measurements should prompt a search for the possible source(s), following the ALARA principle.

  16. Mid-Columbia coho reintroduction feasibility project. Preliminary environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC's Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan

  17. Mid-Columbia Coho Salmon Reintroduction Feasibility Project : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State) Department of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC`s Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan.

  18. Facilitation of the Estuary/Ocean Subgroup and the Expert Regional Technical Group, Fiscal Year 2013 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Sather, Nichole K.

    2013-10-30

    This project covers facilitation of the Estuary/Ocean Subgroup (EOS) for federal research, monitoring, and evaluation (RME) and the Expert Regional Technical Group (ERTG) for estuary habitat restoration. The EOS is part of the research, monitoring, and evaluation effort that the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers [Corps], U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The EOS is tasked by National Marine Fisheries Service (NMFS) and the Action Agencies (AAs) to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the river’s plume in the ocean. Initiated in 2002, the EOS is composed of members from BPA, the Corps, NMFS, and Pacific Northwest National Laboratory’s (PNNL’s) Marine Sciences Laboratory, and other agencies as necessary.

  19. BPA/Lower Valley transmission project. Final environmental impact statement. Appendices A, B, D, E, G-N

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration is investigating the feasibility of constructing an additional transmission line, which for the most part will be adjacent to the existing transmission line. This would require the construction or acquisition of additional access roads, used for routine and emergency maintenance and construction activities. A survey was conducted to map any occurrences of threatened, endangered and sensitivity plant species and weed species along the Swan Valley-Teton Line. This report contains Appendices A, B, D, E, G--N

  20. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach of the Columbia River, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John; Nugent, Michael; Brock, Wendy (Washington Department of Fish and Wildlife, Olympia, WA)

    2002-05-29

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the fourth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2000 field season.

  1. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  2. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach of the Columbia River, 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John

    2002-01-24

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the third year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1999 field season.

  3. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach in the Columbia River, 1998 Interim Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John; Newsome, Todd; Nugent, Michael (Washington Department of Fish and Wildlife, Olympia, WA)

    2001-07-27

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.

  4. Pleistocene Lake Bonneville and Eberswalde Crater of Mars: Quantitative Methods for Recognizing Poorly Developed Lacustrine Shorelines

    Science.gov (United States)

    Jewell, P. W.

    2014-12-01

    The ability to quantify shoreline features on Earth has been aided by advances in acquisition of high-resolution topography through laser imaging and photogrammetry. Well-defined and well-documented features such as the Bonneville, Provo, and Stansbury shorelines of Late Pleistocene Lake Bonneville are recognizable to the untrained eye and easily mappable on aerial photos. The continuity and correlation of lesser shorelines must rely quantitative algorithms for processing high-resolution data in order to gain widespread scientific acceptance. Using Savitsky-Golay filters and the geomorphic methods and criteria described by Hare et al. [2001], minor, transgressive, erosional shorelines of Lake Bonneville have been identified and correlated across the basin with varying degrees of statistical confidence. Results solve one of the key paradoxes of Lake Bonneville first described by G. K. Gilbert in the late 19th century and point the way for understanding climatically driven oscillations of the Last Glacial Maximum in the Great Basin of the United States. Similar techniques have been applied to the Eberswalde Crater area of Mars using HRiSE DEMs (1 m horizontal resolution) where a paleolake is hypothesized to have existed. Results illustrate the challenges of identifying shorelines where long term aeolian processes have degraded the shorelines and field validation is not possible. The work illustrates the promises and challenges of indentifying remnants of a global ocean elsewhere on the red planet.

  5. Structural Analysis of the Bacterial Proteasome Activator Bpa in Complex with the 20S Proteasome.

    Science.gov (United States)

    Bolten, Marcel; Delley, Cyrille L; Leibundgut, Marc; Boehringer, Daniel; Ban, Nenad; Weber-Ban, Eilika

    2016-12-06

    Mycobacterium tuberculosis harbors proteasomes that recruit substrates for degradation through an ubiquitin-like modification pathway. Recently, a non-ATPase activator termed Bpa (bacterial proteasome activator) was shown to support an alternate proteasomal degradation pathway. Here, we present the cryo-electron microscopy (cryo-EM) structure of Bpa in complex with the 20S core particle (CP). For docking into the cryo-EM density, we solved the X-ray structure of Bpa, showing that it forms tight four-helix bundles arranged into a 12-membered ring with a 40 Å wide central pore and the C-terminal helix of each protomer protruding from the ring. The Bpa model was fitted into the cryo-EM map of the Bpa-CP complex, revealing its architecture and striking symmetry mismatch. The Bpa-CP interface was resolved to 3.5 Å, showing the interactions between the C-terminal GQYL motif of Bpa and the proteasome α-rings. This docking mode is related to the one observed for eukaryotic activators with features specific to the bacterial complex. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Occupational exposure to bisphenol A (BPA) in a plastic injection molding factory in Malaysia.

    Science.gov (United States)

    Kouidhi, Wided; Thannimalay, Letchumi; Soon, Chen Sau; Ali Mohd, Mustafa

    2017-07-14

    The purpose of this study has been to assess ambient bisphenol A (BPA) levels in workplaces and urine levels of workers and to establish a BPA database for different populations in Malaysia. Urine samples were collected from plastic factory workers and from control subjects after their shift. Air samples were collected using gas analyzers from 5 sampling positions in the injection molding unit work area and from ambient air. The level of BPA in airborne and urine samples was quantified by the gas chromatography mass spectrometry - selected ion monitoring (GCMS-SIM) analysis. Bisphenol A was detected in the median range of 8-28.3 ng/m³ and 2.4-3.59 ng/m³ for the 5 sampling points in the plastic molding factory and in the ambient air respectively. The median urinary BPA concentration was significantly higher in the workers (3.81 ng/ml) than in control subjects (0.73 ng/ml). The urinary BPA concentration was significantly associated with airborne BPA levels (ρ = 0.55, p Malaysia are occupationally exposed to BPA. Int J Occup Med Environ Health 2017;30(5):743-750. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  7. Exposure to the BPA-Substitute Bisphenol S Causes Unique Alterations of Germline Function.

    Directory of Open Access Journals (Sweden)

    Yichang Chen

    2016-07-01

    Full Text Available Concerns about the safety of Bisphenol A, a chemical found in plastics, receipts, food packaging and more, have led to its replacement with substitutes now found in a multitude of consumer products. However, several popular BPA-free alternatives, such as Bisphenol S, share a high degree of structural similarity with BPA, suggesting that these substitutes may disrupt similar developmental and reproductive pathways. We compared the effects of BPA and BPS on germline and reproductive functions using the genetic model system Caenorhabditis elegans. We found that, similarly to BPA, BPS caused severe reproductive defects including germline apoptosis and embryonic lethality. However, meiotic recombination, targeted gene expression, whole transcriptome and ontology analyses as well as ToxCast data mining all indicate that these effects are partly achieved via mechanisms distinct from BPAs. These findings therefore raise new concerns about the safety of BPA alternatives and the risk associated with human exposure to mixtures.

  8. Dormaier and Chester Butte 2007 Follow-up Habitat Evaluation Procedures Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-01-01

    Follow-up habitat evaluation procedures (HEP) analyses were conducted on the Dormaier and Chester Butte wildlife mitigation sites in April 2007 to determine the number of additional habitat units to credit Bonneville Power Administration (BPA) for providing funds to enhance, and maintain the project sites as partial mitigation for habitat losses associated with construction of Grand Coulee Dam. The Dormaier follow-up HEP survey generated 482.92 habitat units (HU) or 1.51 HUs per acre for an increase of 34.92 HUs over baseline credits. Likewise, 2,949.06 HUs (1.45 HUs/acre) were generated from the Chester Butte follow-up HEP analysis for an increase of 1,511.29 habitat units above baseline survey results. Combined, BPA will be credited with an additional 1,546.21 follow-up habitat units from the Dormaier and Chester Butte parcels.

  9. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  10. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  11. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  12. Washington wildlife mitigation projects. Final programmatic environmental assessment and finding of no significant impact

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities

  13. Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

  14. Protect Anadromous Salmonids in the Mainstem Corridor, Monitoring and Evaluation, Annual Report 200-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Vigg, Steven; Johnson, John

    2002-02-01

    In this annual Monitoring & Evaluation (M&E) report to the Bonneville Power Administration (BPA), we summarize significant activities and performance measures resultant from enhanced protection by Columbia River Inter-Tribal Fisheries Enforcement (CRITFE) in the mainstem corridor (BPA Project 2000-056). This report covers the Fiscal Year (FY) 2000 performance period -- May 15, 2000 to May 14, 2001. Quarterly progress reports have previously been submitted to BPA and are posted on the M&E Web site (www.Eco-Law.net) -- for the time period April-December 2000 (Vigg 2000b,c,d) and for the period January-June 2001 (Vigg 2001a,b). We also present comprehensive data representing the first quarter of year 2000 in this report for a pre-project comparison. In addition, we have analyzed specific annual enforcement statistics to evaluate trends during the baseline period 1996-2000. Additional statistics and more years of comprehensive baseline data are now being summarized, and will be presented in future M&E annual reports--to provide a longer time series for evaluation of trends in input, output and outcome performance standards.

  15. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities

    International Nuclear Information System (INIS)

    Hawkes, L.A.; Martinson, R.D.; Absolon, R.F.

    1993-05-01

    The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relative run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC's Fish Passage Data System (FPDS)

  16. Biodistribution of BPA and BSH after single, repeated and simultaneous administrations for neutron-capture therapy of cancer

    Energy Technology Data Exchange (ETDEWEB)

    Ichikawa, H. [Faculty of Pharmaceutical Sciences and Cooperative Research Center of Life Sciences, Kobe Gakuin University, 1-1-3 Minatojima, Chuo-ku, Kobe 650-8586 (Japan)], E-mail: ichikawa@pharm.kobegakuin.ac.jp; Taniguchi, E. [Faculty of Pharmaceutical Sciences and Cooperative Research Center of Life Sciences, Kobe Gakuin University, 1-1-3 Minatojima, Chuo-ku, Kobe 650-8586 (Japan); Fujimoto, T. [Department of Orthopaedic Surgery, Hyogo Cancer Center, Akashi 673-0021 (Japan); Fukumori, Y. [Faculty of Pharmaceutical Sciences and Cooperative Research Center of Life Sciences, Kobe Gakuin University, 1-1-3 Minatojima, Chuo-ku, Kobe 650-8586 (Japan)

    2009-07-15

    The effect of administration mode of L-BPA and BSH on the biodistribution in the melanoma-bearing hamsters was investigated. In single intravenous (i.v.) administration, BSH (100 mg BSH/kg) showed no significant retention of {sup 10}B in all the tissues, including tumors, while long-term retention of {sup 10}B in the tumor, muscle and brain was observed with L-BPA (500 mg BPA/kg). The dose escalation of L-BPA and the simultaneous single administration of L-BPA and BSH were not so effective at increasing boron accumulation in tumor after bolus i.v. injection. The boron concentration in tumor was 41 {mu}g B/g after single bolus i.v. injection even at the dose of 1000 mg BPA/kg. In contrast, two sequential bolus i.v. injections of L-BPA with the dose of 500 mg BPA/kg each was found to be effective at increasing {sup 10}B accumulation in the tumor; the maximum {sup 10}B concentration in the tumor reached 52 {mu}g B/g at 3 h after the second i.v. injection.

  17. Developmental programming: interaction between prenatal BPA exposure and postnatal adiposity on metabolic variables in female sheep.

    Science.gov (United States)

    Veiga-Lopez, Almudena; Moeller, Jacob; Sreedharan, Rohit; Singer, Kanakadurga; Lumeng, Carey; Ye, Wen; Pease, Anthony; Padmanabhan, Vasantha

    2016-02-01

    Among potential contributors for the increased incidence of metabolic diseases is the developmental exposure to endocrine-disrupting chemicals such as bisphenol A (BPA). BPA is an estrogenic chemical used in a variety of consumer products. Evidence points to interactions of BPA with the prevailing environment. The aim of this study was to assess the effects of prenatal exposure to BPA on postnatal metabolic outcomes, including insulin resistance, adipose tissue distribution, adipocyte morphometry, and expression of inflammatory markers in adipose tissue as well as to assess whether postnatal overfeeding would exacerbate these effects. Findings indicate that prenatal BPA exposure leads to insulin resistance in adulthood in the first breeder cohort (study 1), but not in the second cohort (study 2), which is suggestive of potential differences in genetic susceptibility. BPA exposure induced adipocyte hypertrophy in the visceral fat depot without an accompanying increase in visceral fat mass or increased CD68, a marker of macrophage infiltration, in the subcutaneous fat depot. Cohens effect size analysis found the ratio of visceral to subcutaneous fat depot in the prenatal BPA-treated overfed group to be higher compared with the control-overfed group. Altogether, these results suggest that exposure to BPA during fetal life at levels found in humans can program metabolic outcomes that lead to insulin resistance, a forerunner of type 2 diabetes, with postnatal obesity failing to manifest any interaction with prenatal BPA relative to insulin resistance and adipocyte hypertrophy. Copyright © 2016 the American Physiological Society.

  18. Effects of riboflavin photosensitization on the degradation of bisphenol A (BPA) in model and real-food systems.

    Science.gov (United States)

    Ha, Dong-Oh; Jeong, Min Kyu; Park, Chan Uk; Park, Min Hee; Chang, Pahn-Shick; Lee, Jae Hwan

    2009-06-01

    Effects of riboflavin photosensitizations on the stability of bisphenol A (BPA), a well-known endocrine disrupting chemical, were studied in model and real-food systems by high-performance liquid chromatography (HPLC). Concentration of BPA was significantly decreased under light exposure (P 0.05). Addition of 50, 100, and 200 microM sodium azide significantly increased the stability of BPA in riboflavin photosensitization with concentration dependent manner (P canned tea beverages with different phenolic contents. BPA was more stable in the beverage sample with higher total phenolic contents and free radical scavenging ability. The photodegradation of BPA in riboflavin photosensitization can be an efficient way to decrease the concentration of BPA from environmental or food systems.

  19. Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

    2008-12-01

    In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific

  20. 1998-1999 evaluation of fall chinook and chum salmon spawning below Bonneville, The Dalles, John Day and McNary dams

    International Nuclear Information System (INIS)

    Naald, W.D. van der

    2001-01-01

    This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6

  1. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  2. Long-term BPA infusions. Evaluation in the rat brain tumor and rat spinal cord models

    International Nuclear Information System (INIS)

    Coderre, J.A.; Micca, P.L.; Nawrocky, M.M.; Joel, D.D.; Morris, G.M.

    2000-01-01

    In the BPA-based dose escalation clinical trial, the observations of tumor recurrence in areas of extremely high calculated tumor doses suggest that the BPA distribution is non-uniform. Longer (6-hour) i.v. infusions of BPA are evaluated in the rat brain tumor and spinal cord models to address the questions of whether long-term infusions are more effective against the tumor and whether long-term infusions are detrimental in the central nervous system. In the rat spinal cord, the 50% effective doses (ED 50 ) for myeloparesis were not significantly different after a single i.p. injection of BPA-fructose or a 6 hour i.v. infusion. In the rat 9L gliosarcoma brain tumor model, BNCT following 2-hr or 6-hr infusions of BPA-F produced similar levels of long term survival. (author)

  3. Research and Development Report, Fiscial Year 1989-1990.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-08-01

    Since the 1940s, the Bonneville Power Administrative (BPA), has sought to advance an efficient system to provide the Pacific Northwest region with safe, reliable, and cost-effective electrical power. Research and development (R D) activities support that mission. Each biennium, R D managers issue a digest report of the various programs and activities in each of the technological arenas. The report covers a few projects, considered as yielding particularly significant results, as spotlights. Others are described less fully; in some cases with a simple annotation. The report's divisions correspond to the major categories of R D projects: fish and wildlife, energy resources, and transmission technology. 18 figs., 4 tabs.

  4. Annual coded wire tag program, Washington: Missing production groups. Annual report for 1998

    International Nuclear Information System (INIS)

    Byrne, J.; Fuss, H.

    1999-01-01

    The Bonneville Power Administration (BPA) funds the ''Annual Coded Wire Tag Program--Missing Production Groups for Columbia River Hatcheries'' project. The WDFW project has three main objectives: (1) coded-wire tag at least one production group of each species at each Columbia Basin hatchery to enable evaluation of survival and catch distribution over time, (2) recover coded-wire tags from the snouts of fish tagged under objective 1 and estimate survival, contribution, and stray rates for each group, and (3) report the findings under objective 2 for all broods of chinook, and coho released from WDFW Columbia Basin hatcheries

  5. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  6. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  7. Developmental programming: Prenatal BPA treatment disrupts timing of LH surge and ovarian follicular wave dynamics in adult sheep

    International Nuclear Information System (INIS)

    Veiga-Lopez, A.; Beckett, E.M.; Abi Salloum, B.; Ye, W.; Padmanabhan, V.

    2014-01-01

    Developmental exposure to BPA adversely affects reproductive function. In sheep, prenatal BPA treatment induces reproductive neuroendocrine defects, manifested as LH excess and dampened LH surge and perturbs early ovarian gene expression. In this study we hypothesized that prenatal BPA treatment will also disrupt ovarian follicular dynamics. Pregnant sheep were treated from days 30 to 90 of gestation with 3 different BPA doses (0.05, 0.5, or 5 mg/kg BW/day). All female offspring were estrus synchronized and transrectal ultrasonography was performed daily for 22 days to monitor ovarian follicular and corpora lutea dynamics. Blood samples were collected to assess preovulatory hormonal changes and luteal progesterone dynamics. Statistical analysis revealed that the time interval between the estradiol rise and the preovulatory LH surge was shortened in the BPA-treated females. None of the three BPA doses had an effect on corpora lutea, progestogenic cycles, and mean number or duration of ovulatory and non-ovulatory follicles. However, differences in follicular count trajectories were evident in all three follicular size classes (2–3 mm, 4–5 mm, and ≥ 6 mm) of prenatal BPA-treated animals compared to controls. Number of follicular waves tended also to be more variable in the prenatal BPA-treated groups ranging from 2 to 5 follicular waves per cycle, while this was restricted to 3 to 4 waves in control females. These changes in ovarian follicular dynamics coupled with defects in time interval between estradiol rise and preovulatory LH release are likely to lead to subfertility in prenatal BPA-treated females. - Highlights: • Prenatal BPA shortens interval between estradiol rise and preovulatory LH surge. • Prenatal BPA affects follicular count trajectory and follicular wave occurrence. • Prenatal BPA does not affect ovulatory rate and progesterone dynamics

  8. Developmental programming: Prenatal BPA treatment disrupts timing of LH surge and ovarian follicular wave dynamics in adult sheep

    Energy Technology Data Exchange (ETDEWEB)

    Veiga-Lopez, A.; Beckett, E.M.; Abi Salloum, B. [Department of Pediatrics, University of Michigan, Ann Arbor, MI (United States); Ye, W. [Department of Biostatistics, University of Michigan, Ann Arbor, MI (United States); Padmanabhan, V., E-mail: vasantha@umich.edu [Department of Pediatrics, University of Michigan, Ann Arbor, MI (United States); The Reproductive Sciences Program, University of Michigan, Ann Arbor, MI (United States)

    2014-09-01

    Developmental exposure to BPA adversely affects reproductive function. In sheep, prenatal BPA treatment induces reproductive neuroendocrine defects, manifested as LH excess and dampened LH surge and perturbs early ovarian gene expression. In this study we hypothesized that prenatal BPA treatment will also disrupt ovarian follicular dynamics. Pregnant sheep were treated from days 30 to 90 of gestation with 3 different BPA doses (0.05, 0.5, or 5 mg/kg BW/day). All female offspring were estrus synchronized and transrectal ultrasonography was performed daily for 22 days to monitor ovarian follicular and corpora lutea dynamics. Blood samples were collected to assess preovulatory hormonal changes and luteal progesterone dynamics. Statistical analysis revealed that the time interval between the estradiol rise and the preovulatory LH surge was shortened in the BPA-treated females. None of the three BPA doses had an effect on corpora lutea, progestogenic cycles, and mean number or duration of ovulatory and non-ovulatory follicles. However, differences in follicular count trajectories were evident in all three follicular size classes (2–3 mm, 4–5 mm, and ≥ 6 mm) of prenatal BPA-treated animals compared to controls. Number of follicular waves tended also to be more variable in the prenatal BPA-treated groups ranging from 2 to 5 follicular waves per cycle, while this was restricted to 3 to 4 waves in control females. These changes in ovarian follicular dynamics coupled with defects in time interval between estradiol rise and preovulatory LH release are likely to lead to subfertility in prenatal BPA-treated females. - Highlights: • Prenatal BPA shortens interval between estradiol rise and preovulatory LH surge. • Prenatal BPA affects follicular count trajectory and follicular wave occurrence. • Prenatal BPA does not affect ovulatory rate and progesterone dynamics.

  9. Exposure assessment of adult intake of bisphenol A (BPA) with emphasis on canned food dietary exposures

    OpenAIRE

    Lorber, Matthew; Schecter, Arnold; Paepke, Olaf; Shropshire, William; Christensen, Krista; Birnbaum, Linda

    2015-01-01

    Bisphenol A (BPA) is a high-volume, synthetic compound found in epoxy resins and plastics used in food packaging. Food is believed to be a major source of BPA intake. In this study, we measured the concentration of BPA in convenience samplings of foodstuffs purchased in Dallas, Texas. Sampling entailed collection of 204 samples of fresh, frozen, and canned foods in two rounds in 2010. BPA was positive in 73% of the canned food samples, while it was found in only 7% of non-canned foods at low ...

  10. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rakowski, Cynthia L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Perkins, William A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Richmond, Marshall C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  11. Occupational exposure to bisphenol A (BPA) in a plastic injection molding factory in Malaysia

    OpenAIRE

    Wided Kouidhi; Letchumi Thannimalay; Chen Sau Soon; Mustafa Ali Mohd

    2017-01-01

    Objectives: The purpose of this study has been to assess ambient bisphenol A (BPA) levels in workplaces and urine levels of workers and to establish a BPA database for different populations in Malaysia. Material and Methods: Urine samples were collected from plastic factory workers and from control subjects after their shift. Air samples were collected using gas analyzers from 5 sampling positions in the injection molding unit work area and from ambient air. The level of BPA in airborne and u...

  12. Low-dose BPA exposure alters the mesenchymal and epithelial transcriptomes of the mouse fetal mammary gland.

    Directory of Open Access Journals (Sweden)

    Perinaaz R Wadia

    Full Text Available Exposure of rodent fetuses to low doses of the endocrine disruptor bisphenol A (BPA causes subtle morphological changes in the prenatal mammary gland and results in pre-cancerous and cancerous lesions during adulthood. To examine whether the BPA-induced morphological alterations of the fetal mouse mammary glands are a associated with changes in mRNA expression reflecting estrogenic actions and/or b dependent on the estrogen receptor α (ERα, we compared the transcriptomal effects of BPA and the steroidal estrogen ethinylestradiol (EE2 on fetal mammary tissues of wild type and ERα knock-out mice. Mammary glands from fetuses of dams exposed to vehicle, 250 ng BPA/kg BW/d or 10 ng EE2/kg BW/d from embryonic day (E 8 were harvested at E19. Transcriptomal analyses on the ductal epithelium and periductal stroma revealed altered expression of genes involved in the focal adhesion and adipogenesis pathways in the BPA-exposed stroma while genes regulating the apoptosis pathway changed their expression in the BPA-exposed epithelium. These changes in gene expression correlated with previously reported histological changes in matrix organization, adipogenesis, and lumen formation resulting in enhanced maturation of the fat-pad and delayed lumen formation in the epithelium of BPA-exposed fetal mammary glands. Overall similarities in the transcriptomal effects of BPA and EE2 were more pronounced in the epithelium, than in the stroma. In addition, the effects of BPA and EE2 on the expression of various genes involved in mammary stromal-epithelial interactions were suppressed in the absence of ERα. These observations support a model whereby BPA and EE2 act directly on the stroma, which expresses ERα, ERβ and GPR30 in fetal mammary glands, and that the stroma, in turn, affects gene expression in the epithelium, where ERα and ERβ are below the level of detection at this stage of development.

  13. Bisphenol A (BPA) in China: a review of sources, environmental levels, and potential human health impacts.

    Science.gov (United States)

    Huang, Y Q; Wong, C K C; Zheng, J S; Bouwman, H; Barra, R; Wahlström, B; Neretin, L; Wong, M H

    2012-07-01

    Bisphenol A (BPA), identified as an endocrine disruptor, is an industrially important chemical that is used as a raw material in the manufacture of many products such as engineering plastics (e.g., epoxy resins/polycarbonate plastics), food cans (i.e., lacquer coatings), and dental composites/sealants. The demand and production capacity of BPA in China have grown rapidly. This trend will lead to much more BPA contamination in the environmental media and in the general population in China. This paper reviews the current literature concerning the pollution status of BPA in China (the mainland, Hong Kong, and Taiwan) and its potential impact on human health. Due to potential human health risks from long-term exposure to BPA, body burden of the contaminant should be monitored. Copyright © 2011 Elsevier Ltd. All rights reserved.

  14. Fish Passage Center 2001 annual report.; ANNUAL

    International Nuclear Information System (INIS)

    Fish Passage Center

    2002-01-01

    Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of Biological Opinion

  15. Estrogens in the wrong place at the wrong time: Fetal BPA exposure and mammary cancer.

    Science.gov (United States)

    Paulose, Tessie; Speroni, Lucia; Sonnenschein, Carlos; Soto, Ana M

    2015-07-01

    Iatrogenic gestational exposure to diethylstilbestrol (DES) induced alterations of the genital tract and predisposed individuals to develop clear cell carcinoma of the vagina as well as breast cancer later in life. Gestational exposure of rodents to a related compound, the xenoestrogen bisphenol-A (BPA) increases the propensity to develop mammary cancer during adulthood, long after cessation of exposure. Exposure to BPA during gestation induces morphological alterations in both the stroma and the epithelium of the fetal mammary gland at 18 days of age. We postulate that the primary target of BPA is the fetal stroma, the only mammary tissue expressing estrogen receptors during fetal life. BPA would then alter the reciprocal stroma-epithelial interactions that mediate mammogenesis. In addition to this direct effect on the mammary gland, BPA is postulated to affect the hypothalamus and thus in turn affect the regulation of mammotropic hormones at puberty and beyond. Copyright © 2014 Elsevier Inc. All rights reserved.

  16. Prediction and evaluation of route dependent dosimetry of BPA in rats at different life stages using a physiologically based pharmacokinetic model

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Xiaoxia, E-mail: Xiaoxia.Yang@fda.hhs.gov; Doerge, Daniel R.; Fisher, Jeffrey W.

    2013-07-01

    Bisphenol A (BPA) has received considerable attention throughout the last decade due to its widespread use in consumer products. For the first time a physiologically based pharmacokinetic (PBPK) model was developed in neonatal and adult rats to quantitatively evaluate age-dependent pharmacokinetics of BPA and its phase II metabolites. The PBPK model was calibrated in adult rats using studies on BPA metabolism and excretion in the liver and gastrointestinal tract, and pharmacokinetic data with BPA in adult rats. For immature rats the hepatic and gastrointestinal metabolism of BPA was inferred from studies on the maturation of phase II enzymes coupled with serum time course data in pups. The calibrated model predicted the measured serum concentrations of BPA and BPA conjugates after administration of 100 μg/kg of d6-BPA in adult rats (oral gavage and intravenous administration) and postnatal days 3, 10, and 21 pups (oral gavage). The observed age-dependent BPA serum concentrations were partially attributed to the immature metabolic capacity of pups. A comparison of the dosimetry of BPA across immature rats and monkeys suggests that dose adjustments would be necessary to extrapolate toxicity studies from neonatal rats to infant humans. - Highlights: • A PBPK model predicts the kinetics of bisphenol A (BPA) in young and adult rats. • BPA metabolism within enterocytes is required for fitting of oral BPA kinetic data. • BPA dosimetry in young rats is different than adult rats and young monkeys.

  17. Prediction and evaluation of route dependent dosimetry of BPA in rats at different life stages using a physiologically based pharmacokinetic model

    International Nuclear Information System (INIS)

    Yang, Xiaoxia; Doerge, Daniel R.; Fisher, Jeffrey W.

    2013-01-01

    Bisphenol A (BPA) has received considerable attention throughout the last decade due to its widespread use in consumer products. For the first time a physiologically based pharmacokinetic (PBPK) model was developed in neonatal and adult rats to quantitatively evaluate age-dependent pharmacokinetics of BPA and its phase II metabolites. The PBPK model was calibrated in adult rats using studies on BPA metabolism and excretion in the liver and gastrointestinal tract, and pharmacokinetic data with BPA in adult rats. For immature rats the hepatic and gastrointestinal metabolism of BPA was inferred from studies on the maturation of phase II enzymes coupled with serum time course data in pups. The calibrated model predicted the measured serum concentrations of BPA and BPA conjugates after administration of 100 μg/kg of d6-BPA in adult rats (oral gavage and intravenous administration) and postnatal days 3, 10, and 21 pups (oral gavage). The observed age-dependent BPA serum concentrations were partially attributed to the immature metabolic capacity of pups. A comparison of the dosimetry of BPA across immature rats and monkeys suggests that dose adjustments would be necessary to extrapolate toxicity studies from neonatal rats to infant humans. - Highlights: • A PBPK model predicts the kinetics of bisphenol A (BPA) in young and adult rats. • BPA metabolism within enterocytes is required for fitting of oral BPA kinetic data. • BPA dosimetry in young rats is different than adult rats and young monkeys

  18. Evaluation of utility residential energy conservation programs: A Pacific Northwest example

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E; Bronfman, B; Goeltz, R; Keating, K; Lerman, D; Timble, J

    1984-03-01

    This paper describes a detailed quantitative evaluation of the Residential Weatherization Pilot Program, operated by the Bonneville Power Administration from 1980 through 1982. The program provided free energy audits to more than 6000 electrically-heated homes and gave zero-interest loans to weatherize almost 4000 of these audited homes. The total cost of the program was almost $8 million. Using actual electricity consumption records for program participants and nonparticipants, we calculated the energy-saving effect of the pilot program in several ways and always reached the same conclusion. Households that received an audit and weatherization loan reduced their annual electricity consumption by about 3500 kWh relative to what they would have done without the program; this 3500 kWh is the saving that can be directly attributed to the program. Using a simple net present worth approach, the authors computed program benefits and costs for participating households, the BPA power system, and the Pacific Northwest region as a whole. Under a wide range of assumptions concerning discount rate, years until the weatherization loan is repaid, program energy saving, and BPA's marginal cost of power, the program is economically attractive from all three perspectives.

  19. Perinatal BPA Exposure Induces Hyperglycemia, Oxidative Stress and Decreased Adiponectin Production in Later Life of Male Rat Offspring

    Directory of Open Access Journals (Sweden)

    Shunzhe Song

    2014-04-01

    Full Text Available The main object of the present study was to explore the effect of perinatal bisphenol A (BPA exposure on glucose metabolism in early and later life of male rat offspring, and to establish the potential mechanism of BPA-induced dysglycemia. Pregnant rats were treated with either vehicle or BPA by drinking water at concentrations of 1 and 10 µg/mL BPA from gestation day 6 through the end of lactation. We measured the levels of fasting serum glucose, insulin, adiponectin and parameters of oxidative stress on postnatal day (PND 50 and PND100 in male offspring, and adiponectin mRNA and protein expression in adipose tissue were also examined. Our results showed that perinatal exposure to 1 or 10 µg/mL BPA induced hyperglycemia with insulin resistance on PND100, but only 10 µg/mL BPA exposure had similar effects as early as PND50. In addition, increased oxidative stress and decreased adiponectin production were also observed in BPA exposed male offspring. Our findings indicated that perinatal exposure to BPA resulted in abnormal glucose metabolism in later life of male offspring, with an earlier and more exacerbated effect at higher doses. Down-regulated expression of adiponectin gene and increased oxidative stress induced by BPA may be associated with insulin resistance.

  20. Exposure to BPA in Children—Media-Based and Biomonitoring-Based Approaches

    Directory of Open Access Journals (Sweden)

    Krista L.Y. Christensen

    2014-04-01

    Full Text Available Bisphenol A (BPA is used in numerous industrial and consumer product applications resulting in ubiquitous exposure. Children’s exposure is of particular concern because of evidence of developmental effects. Childhood exposure is estimated for different age groups in two ways. The “forward” approach uses information on BPA concentrations in food and other environmental media (air, water, etc. combined with average contact rates for each medium. The “backward” approach relies on urinary biomonitoring, extrapolating backward to the intake which would have led to the observed biomarker level. The forward analysis shows that BPA intakes are dominated by canned food consumption, and that intakes are higher for younger ages. Mean intake estimates ranged from ~125 ng/kg-day for 1 year-olds to ~73 ng/kg-day among 16–20 years olds. Biomonitoring-based intakes show the same trend of lower intakes for older children, with an estimate of 121 (median to 153 (mean ng/kg-day for 2–6 years, compared with 33 (median to 53–66 (mean ng/kg-day for 16–20 years. Infant intakes were estimated to range from ~46 to 137 ng/kg-day. Recognizing uncertainties and limitations, this analysis suggests that the “forward” and “backward” methods provide comparable results and identify canned foods as a potentially important source of BPA exposure for children.

  1. Androgen and Progesterone Receptors Are Targets for Bisphenol A (BPA, 4-Methyl-2,4-bis-(P-HydroxyphenylPent-1-Ene--A Potent Metabolite of BPA, and 4-Tert-Octylphenol: A Computational Insight.

    Directory of Open Access Journals (Sweden)

    Mohd Rehan

    Full Text Available Exposure to toxic industrial chemicals that have capacity to disrupt the endocrine system, also known as endocrine disrupting chemicals (EDCs, has been increasingly associated with reproductive problems in human population. Bisphenol A (BPA; 4,4'-(propane-2,2-diyldiphenol and 4-tert-octylphenol (OP; 4-(1,1,3,3-tetramethylbutylphenol are among the most common environmental contaminants possessing endocrine disruption properties and are present in plastics, epoxy resins, detergents and other commercial products of common personal and industrial use. A metabolite of BPA, 4-Methyl-2,4-bis(4-hydroxyphenylpent-1-ene (MBP is about 1000 times more biologically active compared to BPA. Epidemiological, clinical, and experimental studies have shown association of BPA and OP with adverse effects on male and female reproductive system in human and animals. The endocrine disruption activity can occur through multiple pathways including binding to steroid receptors. Androgen receptor (AR and progesterone receptor (PR are critical for reproductive tract growth and function. Structural binding characterization of BPA, MBP, and OP with AR and PR using molecular docking simulation approaches revealed novel interactions of BPA with PR, and MBP and OP with AR and PR. For BPA, MBP, and OP, five AR interacting residues Leu-701, Leu-704, Asn-705, Met-742, and Phe-764 overlapped with those of native AR ligand testosterone, and four PR interacting residues Leu-715, Leu-718, Met-756, and Met-759 overlapped with those of PR co-complex ligand, norethindrone. For both the receptors the binding strength of MBP was maximum among the three compounds. Thus, these compounds have the potential to block or interfere in the binding of the endogenous native AR and PR ligands and, hence, resulting in dysfunction. The knowledge of the key interactions and the important amino-acid residues also allows better prediction of potential of xenobiotic molecules for disrupting AR- and PR

  2. West Foster Creek Expansion Project 2007 HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-02-01

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  3. Preliminary Feasibility Assessment of Integrating CCHP with NW Food Processing Plant #1: Modeling Documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Michael G.; Srivastava, Viraj; Wagner, Anne W.; Makhmalbaf, Atefe; Thornton, John

    2014-01-01

    The Pacific Northwest National Laboratory (PNNL) has launched a project funded by the Bonneville Power Association (BPA) to identify strategies for increasing industrial energy efficiency and reducing energy costs of Northwest Food Processors Association (NWFPA) plants through deployment of novel combinations and designs of variable-output combined heat and power (CHP) distributed generation (DG), combined cooling, heating and electric power (CCHP) DG and energy storage systems. Detailed evaluations and recommendations of CHP and CCHP DG systems will be performed for several Northwest (NW) food processing sites. The objective is to reduce the overall energy use intensity of NW food processors by 25% by 2020 and by 50% by 2030, as well as reducing emissions and understanding potential congestion reduction impacts on the transmission system in the Pacific Northwest.

  4. Environmental assessment and finding of no significant impact: Hungry Horse--Columbia Falls line rebuild and relocation project

    International Nuclear Information System (INIS)

    1993-09-01

    Bonneville Power Administration (BPA) has identified a need to rebuild the Hungry Horse-Columbia Falls 115,000-volt (115-kV) transmission line to 230-kV. This line supplies power to customers in the area of Columbia Falls, Montana, and integrates generation at the US Bureau of Reclamation's (USBR) Hungry Horse Dam into BPA's transmission grid. There are several problems with the existing system. The Hungry Horse-Columbia Falls 1 15-kV line is 45 years old and requires excessive maintenance. The USBR has decided to replace their aging 115-kV transformers at the dam with 230-kV transformers, which also would increase their operational flexibility. With the small conductor size and voltage of the line presently being used, significant amounts of energy are lost as the power moves across the line. Transformer failure at Hungry Horse Dam has led to joint planning between BPA and the USBR. (USBR and the US Forest Service are cooperating agencies on the proposed project.) The proposal to eliminate the 115-kV equipment and convert to 230-kV operation was the least costly of the options studied. By rebuilding the line, maintenance costs (and time required for outages) would be reduced. The increased generation at the USBR dam would be safely and consistently transmitted over the improved system, and less energy would be lost from the line, a cost and energy savings

  5. Wind River Watershed Restoration, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Jezorek, Ian G.; Connolly, Patrick J.; Munz, Carrie [U.S. Geological Survey

    2008-11-10

    This report summarizes work completed by U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) in the Wind River subbasin during the period April 2005 through March 2006 under Bonneville Power Administration (BPA) contract 22095. During this period, we collected temperature, flow, and habitat data to characterize habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. We also conducted electrofishing and snorkeling surveys to determine juvenile salmonid populations within select study areas throughout the subbasin. Portions of this work were completed with additional funding from U.S. Fish and Wildlife Service (USFWS) and the Lower Columbia Fish Enhancement Group (LCFEG). A statement of work (SOW) was submitted to BPA in March 2005 that outlined work to be performed by USGS-CRRL. The SOW was organized by work elements, with each describing a research task. This report summarizes the progress completed under each work element.

  6. Analysis of organizational options for the uranium enrichment enterprise in relation to asset divesture

    International Nuclear Information System (INIS)

    Harrer, B.J.; Hattrup, M.P.; Dase, J.E.; Nicholls, A.K.

    1986-08-01

    This report presents a comparison of the characteristics of some prominent examples of independent government corporations and agencies with respect to the Department of Energy's (DOE) uranium enrichment enterprise. The six examples studied were: the Bonneville Power Administration (BPA); the Tennessee Valley Authority (TVA); the Synthetic Fuels Corporation (SYNFUELS); the Consolidated Rail Corporation (CONRAIL); the British Telecommunications Corporation (British TELECOM); and the Communications Satellite Organization (COMSAT), in order of decreasing levels of government ownership and control. They range from BPA, which is organized as an agency within DOE, to COMSAT, which is privately owned and free from almost all regulations common to government agencies. Differences in the degree of government involvement in these corporations and in many other characteristics serve to illustrate that there are no accepted standards for defining the characteristics of government corporations. Thus, historical precedent indicates considerable flexibility would be available in the development of enabling legislation to reorganize the enrichment enterprise as a government corporation or independent government agency

  7. Field review of fish habitat improvement projects in central Idaho

    International Nuclear Information System (INIS)

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  8. Prevention of lung cancer by remediation of residential exposure to radon daughters

    International Nuclear Information System (INIS)

    Mahaffey, J.A.; Cross, F.T.; Johnson, J.R.; Baechler, M.C.

    1991-01-01

    The United States Bonneville Power Administration (BPA), as part of an energy conservation programme in the states of Washington, Oregon, Idaho, Wyoming, and Montana, has collected over 36,000 residential radon concentration measurements. Data were collected between 1983 and 1989 with ambient α etched track dosemeters. Based on the linear risk coefficient from the BEIR IV report for lifetime lung cancer in smokers and non-smokers, numbers of lung cancer cases attributable to radon exposure were predicted. Numbers of baseline lung cancer cases and numbers of these that were preventable by remediation were also estimated. Remediation to 10 pCi.1 -1 , to 4 pCi.1 -1 , and to outdoor levels were considered. With vital statistics data, results were extrapolated to populations in the states represented by the BPA data. Costs of remediation were estimated. Results were evaluated in terms of cost per cancer saved and per cent reduction in fatal lung cancer cases from the baseline estimate. (author)

  9. Electroenzymatic oxidation of bisphenol A (BPA) based on the hemoglobin (Hb) film in a membraneless electrochemical reactor

    International Nuclear Information System (INIS)

    Tang Tiantian; Hou Juying; Ai Shiyun; Qiu Yanyan; Ma Qiang; Han Ruixia

    2010-01-01

    This paper presents a novel electroenzymatic method for the treatment of bisphenol A (BPA) in a membraneless electrochemical reactor. The electrochemical reactor was arranged with a stainless steel and an enzymatic film as anode and cathode, respectively. The enzymatic film was formed by immobilizing hemoglobin (Hb) on carbon fiber. In the membraneless electrochemical reactor, hydrogen peroxide (H 2 O 2 ) was generated in situ in cathode and BPA was oxidated and removed by the combining Hb with H 2 O 2 . The experimental conditions for electrogeneration of H 2 O 2 and electroremoval of BPA were optimized. Experimental results showed that in supplied voltage 2.4 V, pH 5.0 and oxygen flow rate 25 mL/min, the electrogeneration of H 2 O 2 and the electroenzymatic removal of BPA were highest. Under optimal operation conditions, the removal efficiency of BPA reached 50.7% in 120 min and then kept constant when further prolonging the period of reaction. Compared with electrochemical and biochemical methods, the removal of BPA through electroenzymatic method was comparatively favorable.

  10. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

  11. Developmental programming: Prenatal BPA treatment disrupts timing of LH surge and ovarian follicular wave dynamics in adult sheep

    Science.gov (United States)

    Veiga-Lopez, A; Beckett, EM; Abi Salloum, B; Ye, W; Padmanabhan, V

    2014-01-01

    Developmental exposure to BPA adversely affects reproductive function. In sheep, prenatal BPA treatment induces reproductive neuroendocrine defects, manifested as LH excess and dampened LH surge and perturbs early ovarian gene expression. In this study we hypothesized that prenatal BPA treatment will also disrupt ovarian follicular dynamics. Pregnant sheep were treated from days 30 to 90 of gestation with 3 different BPA doses (0.05, 0.5, or 5 mg/kg BW/day). All female offspring were estrus synchronized and transrectal ultrasonography was performed daily for 22 days to monitor ovarian follicular and corpora lutea dynamics. Blood samples were collected to assess hormonal preovulatory changes and luteal progesterone dynamics. Statistical analysis revealed that the time interval between the estradiol rise and the preovulatory LH surge was shortened in the BPA-treated females. None of the three BPA doses had an effect on corpora lutea, progestogenic cycles, and mean or duration of ovulatory and non-ovulatory follicles. However, differences in follicular count trajectories were evident in all three follicular size classes (2–3 mm, 4–5 mm, and ≥ 6 mm) of prenatal BPA-treated animals compared to controls. Number of follicular waves tended also to be more variable in the prenatal BPA-treated groups ranging from 2 to 5 follicular waves per cycle, while this was restricted to 3 to 4 waves in control females. These changes in ovarian follicular dynamics coupled with defects in time interval between estradiol rise and preovulatory LH release are likely to lead to subfertility in prenatal BPA-treated females. PMID:24923655

  12. Natural Propagation and Habitat Improvement Idaho: Lolo Creek and Upper Lochsa, Clearwater National Forest.

    Energy Technology Data Exchange (ETDEWEB)

    Espinosa, F.A. Jr.; Lee, Kristine M.

    1991-01-01

    In 1983, the Clearwater National Forest and the Bonneville Power Administration (BPA) entered into a contractual agreement to improve anadromous fish habitat in selected tributaries of the Clearwater River Basin. This agreement was drawn under the auspices of the Northwest Power Act of 1980 and the Columbia River basin Fish and Wildlife Program (section 700). The Program was completed in 1990 and this document constitutes the Final Report'' that details all project activities, costs, accomplishments, and responses. The overall goal of the Program was to enhance spawning, rearing, and riparian habitats of Lolo Creek and major tributaries of the Lochsa River so that their production systems could reach full capability and help speed the recovery of salmon and steelhead within the basin.

  13. Natural propagation and habitat improvement Idaho: Lolo Creek and Upper Lochsa, Clearwater National Forest

    International Nuclear Information System (INIS)

    Espinosa, F.A. Jr.; Lee, K.M.

    1991-01-01

    In 1983, the Clearwater National Forest and the Bonneville Power Administration (BPA) entered into a contractual agreement to improve anadromous fish habitat in selected tributaries of the Clearwater River Basin. This agreement was drawn under the auspices of the Northwest Power Act of 1980 and the Columbia River basin Fish and Wildlife Program (section 700). The Program was completed in 1990 and this document constitutes the ''Final Report'' that details all project activities, costs, accomplishments, and responses. The overall goal of the Program was to enhance spawning, rearing, and riparian habitats of Lolo Creek and major tributaries of the Lochsa River so that their production systems could reach full capability and help speed the recovery of salmon and steelhead within the basin

  14. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  15. Positron emission tomography and [{sup 18}F]BPA: A perspective application to assess tumour extraction of boron in BNCT

    Energy Technology Data Exchange (ETDEWEB)

    Menichetti, L. [Department of PET and Radiopharmaceutical Chemistry, C.N.R. Institute of Clinical Physiology, Pisa (Italy)], E-mail: luca.menichetti@ifc.cnr.it; Cionini, L. [Unit of Radiotherapy, AOUP-University Hospital, Pisa (Italy); Sauerwein, W.A. [Department of Radiation Oncology, University Duisburg-Essen, University Hospital Essen (Germany); Altieri, S. [University of Pavia, Department of Nuclear Physics, Pavia (Italy); Solin, O.; Minn, H. [Turku PET Centre, University of Turku (Finland); Salvadori, P.A. [Department of PET and Radiopharmaceutical Chemistry, C.N.R. Institute of Clinical Physiology, Pisa (Italy)

    2009-07-15

    Positron emission tomography (PET) has become a key imaging tool in clinical practice and biomedical research to quantify and study biochemical processes in vivo. Physiologically active compounds are tagged with positron emitters (e.g. {sup 18}F, {sup 11}C, {sup 124}I) while maintaining their biological properties, and are administered intravenously in tracer amounts (10{sup -9}-10{sup -12} M quantities). The recent physical integration of PET and computed tomography (CT) in hybrid PET/CT scanners allows a combined anatomical and functional imaging: nowadays PET molecular imaging is emerging as powerful pharmacological tool in oncology, neurology and for treatment planning as guidance for radiation therapy. The in vivo pharmacokinetics of boron carrier for BNCT and the quantification of {sup 10}B in living tissue were performed by PET in the late nineties using compartmental models based on PET data. Nowadays PET and PET/CT have been used to address the issue of pharmacokinetic, metabolism and accumulation of BPA in target tissue. The added value of the use of L-[{sup 18}F]FBPA and PET/CT in BNCT is to provide key data on the tumour extraction of {sup 10}B-BPA versus normal tissue and to predict the efficacy of the treatment based on a single-study patient analysis. Due to the complexity of a binary treatment like BNCT, the role of PET/CT is currently to design new criteria for patient enrolment in treatment protocols: the L-[{sup 18}F]BPA/PET methodology could be considered as an important tool in newly designed clinical trials to better estimate the concentration ratio of BPA in the tumour as compared to neighbouring normal tissues. Based on these values for individual patients the decision could be made whether BNCT treatment could be advantageous due to a selective accumulation of BPA in an individual tumour. This approach, applicable in different tumour entities like melanoma, glioblastoma and head and neck malignancies, make this methodology as reliable

  16. Electroenzymatic oxidation of bisphenol A (BPA) based on the hemoglobin (Hb) film in a membraneless electrochemical reactor.

    Science.gov (United States)

    Tang, Tiantian; Hou, Juying; Ai, Shiyun; Qiu, Yanyan; Ma, Qiang; Han, Ruixia

    2010-09-15

    This paper presents a novel electroenzymatic method for the treatment of bisphenol A (BPA) in a membraneless electrochemical reactor. The electrochemical reactor was arranged with a stainless steel and an enzymatic film as anode and cathode, respectively. The enzymatic film was formed by immobilizing hemoglobin (Hb) on carbon fiber. In the membraneless electrochemical reactor, hydrogen peroxide (H(2)O(2)) was generated in situ in cathode and BPA was oxidated and removed by the combining Hb with H(2)O(2). The experimental conditions for electrogeneration of H(2)O(2) and electroremoval of BPA were optimized. Experimental results showed that in supplied voltage 2.4 V, pH 5.0 and oxygen flow rate 25 mL/min, the electrogeneration of H(2)O(2) and the electroenzymatic removal of BPA were highest. Under optimal operation conditions, the removal efficiency of BPA reached 50.7% in 120 min and then kept constant when further prolonging the period of reaction. Compared with electrochemical and biochemical methods, the removal of BPA through electroenzymatic method was comparatively favorable. Copyright 2010 Elsevier B.V. All rights reserved.

  17. Above Bonneville passage and propagation cost effectiveness analysis

    International Nuclear Information System (INIS)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region

  18. Above Bonneville Passage and Propagation Cost Effectiveness Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

  19. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

    2001-05-01

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  20. Application of the boron neutron capture therapy to undifferentiated thyroid cancer using two boron compounds (BPA and BOPP)

    International Nuclear Information System (INIS)

    Viaggi, Mabel; Dagrosa, Maria A.; Juvenal, Guillermo J.; Pisarev, Mario A.; Longhino, Juan M.; Blaumann, Hernan R.; Calzetta Larrieu, Osvaldo A.; Kahl, Stephen B.

    2004-01-01

    We have shown the selective uptake of boronophenylalanine (BPA) by undifferentiated thyroid cancer (UTC) human cell line ARO, both in vitro and in vivo. Moreover, a 50% histologic cure of mice bearing the tumor was observed when the complete boron neutron capture therapy was applied. More recently we have analyzed the biodistribution of BOPP (tetrakis-carborane carboxylate ester of 2,4-bis-(ba-dihydroxyethyl)-deutero-porphyrin IX) and showed that when BOPP was injected 5 days before BPA, and the animals were sacrificed 60 min after the ip injection of BPA, a significant increase in boron uptake by the tumor was found (38-45ppm with both compounds Vs. 20 ppm with BPA alone). Five days post the ip BOPP injection and 1 hr after BPA, the ratios were: tumor/blood 3,75; tumor /distal skin 2. Other important ratios were tumor/thyroid 6,65 and tumor/lung 3,8. The present studies were performed in mice transplanted with ARO cells and injected with BOPP and BPA. Only in mice treated with the neutron beam and injected with the boronated compounds we observed a 100% control of tumor growth. Two groups of mice received different total absorbed doses: 3.00 and 6.01 Gy, but no further improvement in the outcome was found compared to the previous results using BPA alone (4.3 Gy). (author)

  1. First clinical results on the finnish study on BPA-mediated BNCT in glioblastoma

    International Nuclear Information System (INIS)

    Kankaanranta, L.; Seppaelae, T.; Kallio, M.

    2000-01-01

    An open phase I dose-escalation boron neutron capture therapy (BNCT) study on glioblastoma multiforme (GBM) was initiated at the BNCT facility FiR 1, Espoo, Finland, in May 1999. The aim of the study is to investigate the safety of boronophenylalanine (BPA)-mediated BNCT. Ten GBM patients were treated with a 2-field treatment plan using one fraction. BPA-F was used as the 10 B carrier infused as a fructose solution 290 mg BPA/kg over 2-hours prior to irradiation with epithermal neutrons. Average doses to the normal brain, contrast enhancing tumour, and the target ranged from 3.0 to 5.6 Gy (W), from 35.1 to 66.7 Gy (W), and from 29.6 to 53.6 Gy (W), respectively. BNCT was associated with acceptable toxicity. The median follow-up is 9 months (range, 3 to 16 months) post diagnosis in July 2000. Seven of the 10 patients have recurrent or persistent GBM, and the median time to progression is 8 months. Only one patient has died, and the estimated 1-year overall survival is 86%. Five of the recurrent tumours were treated with external beam photon radiation therapy to the total dose of 30-40 Gy with few acute side-effects. These preliminary findings suggest that acute toxicity of BPA-mediated BNCT is acceptable when average brain doses of 5.6 Gy (W) or less are used. The followup time is too short to evaluate survival, but the estimated 1-year survival of 86% achieved with BNCT followed by conventional photon irradiation at the time of tumour progression is encouraging and emphasises the need of further investigation of BPA-mediated BNCT. (author)

  2. Biodistribution of p-borophenylalanine (BPA) in dogs with spontaneous undifferentiated thyroid carcinoma (UTC)

    International Nuclear Information System (INIS)

    Dagrosa, M.A.; Viaggi, M.; Rebagliati, R. Jimenez; Castillo, V.A.; Batistoni, D.; Cabrini, R.L.; Castiglia, S.; Juvenal, G.J.; Pisarev, M.A.

    2004-01-01

    Human undifferentiated thyroid carcinoma (UTC) is a very aggressive tumor which lacks an adequate treatment. The UTC human cell line ARO has a selective uptake of BPA in vitro and after transplanting into nude mice. Applications of boron neutron capture therapy (BNCT) to mice showed a 100% control of growth and a 50% histological cure of tumors with an initial volume of 50 mm 3 or less. As a further step towards the potential application in humans we have performed the present studies. Four dogs with diagnosis of spontaneous UTC were studied. A BPA-fructose solution was infused during 60 min and dogs were submitted to thyroidectomy. Samples of blood and from different areas of the tumors (and in one dog from normal thyroid) were obtained and the boron was determined by ICP-OES. Selective BPA uptake by the tumor was found in all animals, the tumor/blood ratios ranged between 2.02 and 3.76, while the tumor/normal thyroid ratio was 6.78. Individual samples had tumor/blood ratios between 8.36 and 0.33. These ratios were related to the two histological patterns observed: homogeneous and heterogeneous tumors. We confirm the selective uptake of BPA by spontaneous UTC in dogs and plan to apply BNCT in the future

  3. Biodistribution of p-borophenylalanine (BPA) in dogs with spontaneous undifferentiated thyroid carcinoma (UTC)

    Energy Technology Data Exchange (ETDEWEB)

    Dagrosa, M.A. E-mail: aledagrosa@fibertel.com.ar; Viaggi, M.; Rebagliati, R. Jimenez; Castillo, V.A.; Batistoni, D.; Cabrini, R.L.; Castiglia, S.; Juvenal, G.J.; Pisarev, M.A

    2004-11-01

    Human undifferentiated thyroid carcinoma (UTC) is a very aggressive tumor which lacks an adequate treatment. The UTC human cell line ARO has a selective uptake of BPA in vitro and after transplanting into nude mice. Applications of boron neutron capture therapy (BNCT) to mice showed a 100% control of growth and a 50% histological cure of tumors with an initial volume of 50 mm{sup 3} or less. As a further step towards the potential application in humans we have performed the present studies. Four dogs with diagnosis of spontaneous UTC were studied. A BPA-fructose solution was infused during 60 min and dogs were submitted to thyroidectomy. Samples of blood and from different areas of the tumors (and in one dog from normal thyroid) were obtained and the boron was determined by ICP-OES. Selective BPA uptake by the tumor was found in all animals, the tumor/blood ratios ranged between 2.02 and 3.76, while the tumor/normal thyroid ratio was 6.78. Individual samples had tumor/blood ratios between 8.36 and 0.33. These ratios were related to the two histological patterns observed: homogeneous and heterogeneous tumors. We confirm the selective uptake of BPA by spontaneous UTC in dogs and plan to apply BNCT in the future.

  4. Enhancing Skin Permeation of Biphenylacetic Acid (BPA) Using Salt Formation with Organic and Alkali Metal Bases.

    Science.gov (United States)

    Pawar, Vijay; Naik, Prashant; Giridhar, Rajani; Yadav, Mange Ram

    2015-01-01

    In the present study, a series of organic and alkali metal salts of biphenylacetic acid (BPA) have been prepared and evaluated in vitro for percutaneous drug delivery. The physicochemical properties of BPA salts were determined using solubility measurements, DSC, and IR. The DSC thermogram and FTIR spectra confirmed the salt formation with organic and alkali metal bases. Among the series, salts with organic amines (ethanolamine, diethanolamine, triethanolamine, and diethylamine) had lowered melting points while the alkali metal salt (sodium) had a higher melting point than BPA. The in vitro study showed that salt formation improves the physicochemical properties of BPA, leading to improved permeability through the skin. Amongst all the prepared salts, ethanolamine salt (1b) showed 7.2- and 5.4-fold higher skin permeation than the parent drug at pH 7.4 and 5.0, respectively, using rat skin.

  5. Bisphenol A (BPA) aggravates multiple low-dose streptozotocin-induced Type 1 diabetes in C57BL/6 mice.

    Science.gov (United States)

    Cetkovic-Cvrlje, Marina; Thinamany, Sinduja; Bruner, Kylie A

    2017-12-01

    Type 1 diabetes (T1D) is a T-cell-mediated autoimmune disorder characterized by destruction of insulin-producing pancreatic β-cells. Whereas epidemiological data implicate environmental factors in the increasing incidence of T1D, their identity remains unknown. Though exposure to bisphenol A (BPA) has been associated with several disorders, no epidemiologic evidence has linked BPA exposure and T1D. The goal of this study was to elucidate diabetogenic potentials of BPA and underlying mechanisms in the context of T-cell immunity, in a multiple low-dose streptozotocin (MLDSTZ)-induced autoimmune mouse T1D model. C57BL/6 mice were orally exposed to 1 or 10 mg BPA/L starting at 4 wk of age; diabetes was induced at 9 wk of age with STZ. T-cell composition, function, and insulitis levels were studied at Days 11 and 50 during diabetes development (i.e. post-first STZ injection). Results showed both BPA doses increased diabetes incidence and affected T-cell immunity. However, mechanisms of diabetogenic action appeared divergent based on dose. Low-dose BPA fits a profile of an agent that exhibits pro-diabetogenic effects via T-cell immunomodulation in the early stages of disease development, i.e. decreases in splenic T-cell subpopulations [especially CD4 + T-cells] along with a trend in elevation of splenic T-cell formation of pro-inflammatory cytokines (IFN-γ, TNF-α, and IL-6). In contrast, high-dose BPA did not affect T-cell populations and led to decreased levels of IFN-γ and TNF-α. Both treatments did not affect insulitis levels at the disease early stage, but aggravated it later on. By the study end, besides decreasing T-cell proliferative capacity, low-dose BPA did not affect other T-cell-related parameters, including cytokine secretion, comparable to the effects of high-dose BPA. In conclusion, this study confirmed BPA as a potential diabetogenic compound with immunomodulatory mechanisms of action - in the context of T-cell immunity - that seemed to be dose

  6. The molecular mechanism of bisphenol A (BPA as an endocrine disruptor by interacting with nuclear receptors: insights from molecular dynamics (MD simulations.

    Directory of Open Access Journals (Sweden)

    Lanlan Li

    Full Text Available Bisphenol A (BPA can interact with nuclear receptors and affect the normal function of nuclear receptors in very low doses, which causes BPA to be one of the most controversial endocrine disruptors. However, the detailed molecular mechanism about how BPA interferes the normal function of nuclear receptors is still undiscovered. Herein, molecular dynamics simulations were performed to explore the detailed interaction mechanism between BPA with three typical nuclear receptors, including hERα, hERRγ and hPPARγ. The simulation results and calculated binding free energies indicate that BPA can bind to these three nuclear receptors. The binding affinities of BPA were slightly lower than that of E2 to these three receptors. The simulation results proved that the binding process was mainly driven by direct hydrogen bond and hydrophobic interactions. In addition, structural analysis suggested that BPA could interact with these nuclear receptors by mimicking the action of natural hormone and keeping the nuclear receptors in active conformations. The present work provided the structural evidence to recognize BPA as an endocrine disruptor and would be important guidance for seeking safer substitutions of BPA.

  7. CLARITY-BPA: Effects of chronic bisphenol A exposure on the immune system: Part 2 - Characterization of lymphoproliferative and immune effector responses by splenic leukocytes.

    Science.gov (United States)

    Li, Jinpeng; Bach, Anthony; Crawford, Robert B; Phadnis-Moghe, Ashwini S; Chen, Weimin; D'Ingillo, Shawna; Kovalova, Natalia; Suarez-Martinez, Jose E; Zhou, Jiajun; Kaplan, Barbara L F; Kaminski, Norbert E

    2018-03-01

    Bisphenol A (BPA) is commonly used in the manufacturing of a wide range of consumer products, including polycarbonate plastics, epoxy resin that lines beverage and food cans, and some dental sealants. Consumption of food and beverages containing BPA represents the primary route of human BPA exposure, which is virtually ubiquitous. An increasing number of studies have evaluated the effects of BPA on immune responses in laboratory animals that have reported a variety of effects some of which have been contradictory. To address the divergent findings surrounding BPA exposure, a comprehensive chronic treatment study of BPA was conducted in Sprague-Dawley rats, termed the Consortium Linking Academic and Regulatory Insights on Toxicity of BPA (CLARITY-BPA). As a participant in the CLARITY-BPA project, our studies evaluated the effects of BPA on a broad range of immune function endpoints using spleen cells isolated from BPA or vehicle treated rats. This comprehensive assessment included measurements of lymphoproliferation in response to mitogenic stimuli, immunoglobulin production by B cells, and cellular activation of T cells, NK cells, monocytes, granulocytes, macrophages and dendritic cells. In total, 630 different measurements in BPA treated rats were performed of which 35 measurements were statistically different from vehicle controls. The most substantive alteration associated with BPA treatment was the augmentation of lymphoproliferation in response to pokeweed mitogen stimulations in 1 year old male rats, which was also observed in the reference estrogen ethinyl estradiol treated groups. With the exception of the aforementioned, the statistically significant changes associated with BPA treatment were mostly sporadic and not dose-dependent with only one out of five BPA dose groups showing a statistical difference. In addition, the observed BPA-associated alterations were mostly moderate in magnitude and showed no persistent trend over the one-year time period

  8. Impairment of learning and memory performances induced by BPA: Evidences from the literature of a MoA mediated through an ED.

    Science.gov (United States)

    Mhaouty-Kodja, Sakina; Belzunces, Luc P; Canivenc, Marie-Chantal; Schroeder, Henri; Chevrier, Cécile; Pasquier, Elodie

    2018-03-29

    Many rodent studies and a few non-human primate data report impairments of spatial and non-spatial memory induced by exposure to bisphenol A (BPA), which are associated with neural modifications, particularly in processes involved in synaptic plasticity. BPA-induced alterations involve disruption of the estrogenic pathway as established by reversal of BPA-induced effects with estrogenic receptor antagonist or by interference of BPA with administered estradiol in ovariectomised animals. Sex differences in hormonal impregnation during critical periods of development and their influence on maturation of learning and memory processes may explain the sexual dimorphism observed in BPA-induced effects in some studies. Altogether, these data highly support the plausibility that alteration of learning and memory and synaptic plasticity by BPA is essentially mediated by disturbance of the estrogenic pathways. As memory function in humans involves similar signaling pathways, this mode of action of BPA has the potential to alter human cognitive abilities. Copyright © 2018. Published by Elsevier B.V.

  9. A highly sensitive and specific capacitive aptasensor for rapid and label-free trace analysis of Bisphenol A (BPA) in canned foods.

    Science.gov (United States)

    Mirzajani, Hadi; Cheng, Cheng; Wu, Jayne; Chen, Jiangang; Eda, Shigotoshi; Najafi Aghdam, Esmaeil; Badri Ghavifekr, Habib

    2017-03-15

    A rapid, highly sensitive, specific and low-cost capacitive affinity biosensor is presented here for label-free and single step detection of Bisphenol A (BPA). The sensor design allows rapid prototyping at low-cost using printed circuit board material by benchtop equipment. High sensitivity detection is achieved through the use of a BPA-specific aptamer as probe molecule and large electrodes to enhance AC-electroelectrothermal effect for long-range transport of BPA molecules toward electrode surface. Capacitive sensing technique is used to determine the bounded BPA level by measuring the sample/electrode interfacial capacitance of the sensor. The developed biosensor can detect BPA level in 20s and exhibits a large linear range from 1 fM to 10 pM, with a limit of detection (LOD) of 152.93 aM. This biosensor was applied to test BPA in canned food samples and could successfully recover the levels of spiked BPA. This sensor technology is demonstrated to be highly promising and reliable for rapid, sensitive and on-site monitoring of BPA in food samples. Copyright © 2016 Elsevier B.V. All rights reserved.

  10. Might iodomethyl-α-tyrosine be a surrogate for BPA in BNCT?

    International Nuclear Information System (INIS)

    Miura, Michiko; Micca, P.L.; Nawrocky, M.M.; Slatkin, D.N.

    1996-01-01

    A single-photon emission computed tomography [SPECT] imaging agent that is an analogue of a boron carrier for boron neutron-capture therapy [BNCT] of cerebral gliomas would be useful for assessing the kinetics of boron uptake in tumors and in the surrounding brain tissues noninvasively. BNCT is based on the interaction of thermalized neutrons with 10 B nuclei in the targeted tumor. For BNCT of brain tumors, it is crucial that 10 B concentrations in radiosensitive regions of the brain be minimal since malignant cells and vital brain tissues are often inter-mingled at the margins of the tumor. Currently, boronophenylalanine [BPA]-mediated BNCT is undergoing preliminary clinical study for postoperative radiotherapy of glioblastorna multiforme at Brookhaven National Laboratory. Investigators in Japan are developing 18 F-fluoroboronophenylaianine [FBPA] as a positron 18 F (T 1/2 = 110 min), which is usually emission tomography [PET] surrogate for BPA. generated at a cyclotron dedicated to PET, is generally a minimally perturbing substitute for the 2-H on the aromatic ring because of its small size and the strong covalent bond it forms with carbon. However, SPECT has potential advantages over PET: (1) SPECT is clinically more widely available at lower cost; (2) most radioisotopes for the synthesis of SPECT agents can be purchased; (3) SPECT is less difficult to implement. It is thought that the quality of images derived from the two techniques would each be sufficiently informative for BNCT treatment planning purposes, provided that the SPECT and PET agents being considered were both pharmacokinetic surrogates for BPA. This study evaluated the use of 123 I alpha methyltyrosine as a surrogate for BPA in BNCT

  11. Might iodomethyl-{alpha}-tyrosine be a surrogate for BPA in BNCT?

    Energy Technology Data Exchange (ETDEWEB)

    Miura, Michiko; Micca, P.L.; Nawrocky, M.M.; Slatkin, D.N.

    1996-12-31

    A single-photon emission computed tomography [SPECT] imaging agent that is an analogue of a boron carrier for boron neutron-capture therapy [BNCT] of cerebral gliomas would be useful for assessing the kinetics of boron uptake in tumors and in the surrounding brain tissues noninvasively. BNCT is based on the interaction of thermalized neutrons with {sup 10}B nuclei in the targeted tumor. For BNCT of brain tumors, it is crucial that {sup 10}B concentrations in radiosensitive regions of the brain be minimal since malignant cells and vital brain tissues are often inter-mingled at the margins of the tumor. Currently, boronophenylalanine [BPA]-mediated BNCT is undergoing preliminary clinical study for postoperative radiotherapy of glioblastorna multiforme at Brookhaven National Laboratory. Investigators in Japan are developing {sup 18}F-fluoroboronophenylaianine [FBPA] as a positron {sup 18}F (T{sub 1/2} = 110 min), which is usually emission tomography [PET] surrogate for BPA. generated at a cyclotron dedicated to PET, is generally a minimally perturbing substitute for the 2-H on the aromatic ring because of its small size and the strong covalent bond it forms with carbon. However, SPECT has potential advantages over PET: (1) SPECT is clinically more widely available at lower cost; (2) most radioisotopes for the synthesis of SPECT agents can be purchased; (3) SPECT is less difficult to implement. It is thought that the quality of images derived from the two techniques would each be sufficiently informative for BNCT treatment planning purposes, provided that the SPECT and PET agents being considered were both pharmacokinetic surrogates for BPA. This study evaluated the use of {sup 123}I alpha methyltyrosine as a surrogate for BPA in BNCT.

  12. Preliminary estimation of infantile exposure to BPA based on the standard quality of baby bottles distributed in Isfahan urban society

    Directory of Open Access Journals (Sweden)

    Zohreh Abdi Moghadam

    2013-01-01

    Full Text Available Aims: This study was aimed to estimate the bisphenol A (BPA intake from baby bottles, considering the diversity and the standard quality of the baby bottles distributed in an Isfahan urban society. Materials and Methods: A cross-sectional study was performed in Isfahan in 2011. Baby shops ( n = 33 and drug stores ( n = 7 in four district areas were included in the study. The distribution of baby bottles was investigated regarding their brand, origin, and being labeled "BPA free." Estimation of exposure to BPA from baby bottles was made based on the national and international representative data. Results: The products marked as "BPA free" were found among the western products and limited to two of the selected areas. No "BPA free" marked baby bottle was distinguished among the Iranian made products. Of the 8% exclusively formula-fed infants, 90% may be the high consumers of BPA from polycarbonate baby bottles, with an intake of 1.5-2 μg/kg b.w./day for the moderate and 7.5-10 μg/kg b.w./day in case of worse condition. Conclusion: Considering the current globally accepted threshold daily intake (TDI for BPA, primary exposure estimation is that feeding using non-BPA-free baby bottles is not a serious health concern in Iran. Thought that threshold level of TDI is discussed to be reduced in future, improvement and revision of the national standards can be effective in reducing the exposure to BPA in Iranian infants so as to provide large margin of safety for them.

  13. Urinary BPA measurements in children and mothers from six European member states

    DEFF Research Database (Denmark)

    Covaci, Adrian; Hond, Elly Den; Geens, Tinne

    2015-01-01

    -mother pairs were recruited through schools or population registers from six European member states (Belgium, Denmark, Luxembourg, Slovenia, Spain and Sweden). Children (5-12y) and mothers donated a urine sample. Information on socio-demographic characteristics, life style, dietary habits, and educational...... determinants. Consumption of canned food and social class (represented by the highest educational level of the family) were the most important predictors for the urinary levels of BPA in mothers and children. The individual BPA levels in children were significantly correlated with the levels in their mothers...

  14. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  15. Rapid Diagnosis of IHN Virus Infection in Salmon and Steelhead Trout, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Leong, JoAnn Ching

    1984-12-01

    The main objective for this study was the development of a rapid diagnostic method for IHN virus in fish tissue samples. The rationale for developing new techniques for diagnosing IHNV infection was that present methods were time consuming and dependent on virus neutralization by specific antisera, a reagent that was not readily available or reliable. Fish pathologists required a rapid detection method which was sensitive enough to detect virus strain differences so that they could provide data for effective management decisions in controlling the spread of IHNV. Bonneville Power Administration's (BPA) role in efforts in fish diseases and more generically the protection, mitigation, and enhancement of Columbia River salmon and steelhead populations, is mandated by Congress through the Pacific Northwest Electric Power Planning and Conservation Act (Regional Act), Pub. L. 96-501. Section 4 (h) of the Regional Act directs the Northwest Power Planning Council to develop a Fish and Wildlife Program. BPA's Administrator is authorized in Section 4 (h) (10) (A) to ''use funds and the authorities available to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries''. The fund is to be used to implement measures that are consistent with the Council's Fish and Wildlife Program. The research detailed in this final report is consistent with these objectives. This final report has been prepared as part of BPA's policy to encourage the preservation and dissemination of research results by publication in scientific journals.

  16. Environmental Assessment : Squawfish Management Program : Final.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  17. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  18. Ashland Area Support Substation Project

    International Nuclear Information System (INIS)

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power ampersand Light Company's (PP ampersand L) 115-kilovolt (kV) transmission lines and through PP ampersand L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP ampersand L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP ampersand L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them

  19. Exposure assessment of adult intake of bisphenol A (BPA) with emphasis on canned food dietary exposures.

    Science.gov (United States)

    Lorber, Matthew; Schecter, Arnold; Paepke, Olaf; Shropshire, William; Christensen, Krista; Birnbaum, Linda

    2015-04-01

    Bisphenol A (BPA) is a high-volume, synthetic compound found in epoxy resins and plastics used in food packaging. Food is believed to be a major source of BPA intake. In this study, we measured the concentration of BPA in convenience samplings of foodstuffs purchased in Dallas, Texas. Sampling entailed collection of 204 samples of fresh, frozen, and canned foods in two rounds in 2010. BPA was positive in 73% of the canned food samples, while it was found in only 7% of non-canned foods at low concentrations. The results of this food sampling program were used to calculate adult dietary intakes of BPA. A pathway approach combined food intakes, a "canned fraction" parameter which described what portion of total intake of that food came from canned products, and measured food concentrations. Dietary intakes were calculated as 12.6 ng/kg-day, of which 12.4 ng/kg-day was from canned foods. Canned vegetable intakes alone were 11.9 ng/kg-day. This dietary intake was compared to total intakes of BPA estimated from urine measurements of the National Health and Nutrition Examination Survey (NHANES). Total adult central tendency intakes ranged from 30 to 70 ng/kg-day for NHANES cycles between 2005 and 2010. Three possibilities were explored to explain the difference between these two approaches for intake estimation. Not all foods which may have been canned, particularly canned beverages such as soft drinks, were sampled in our food sampling program. Second, non-food pathways of exposure may be important for adults, including thermal paper exposures, and dust and air exposures. Finally, our canned food concentrations may not be adequately representative of canned foods in the United States; they were found to be generally lower compared to canned food concentrations measured in six other worldwide food surveys including three in North America. Our finding that canned food concentrations greatly exceeded non-canned concentrations was consistent with other studies, and

  20. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  1. Habitat Evaluation Procedures Report; Graves Property - Yakama Nation.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul; Muse, Anthony

    2008-02-01

    A habitat evaluation procedures (HEP) analysis was conducted on the Graves property (140 acres) in June 2007 to determine the number of habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the property as partial mitigation for habitat losses associated with construction of McNary Dam. HEP surveys also documented the general ecological condition of the property. The Graves property was significantly damaged from past/present livestock grazing practices. Baseline HEP surveys generated 284.28 habitat units (HUs) or 2.03 HUs per acre. Of these, 275.50 HUs were associated with the shrubsteppe/grassland cover type while 8.78 HUs were tied to the riparian shrub cover type.

  2. The status of Tsukuba BNCT trial: BPA-based boron neutron capture therapy combined with X-ray irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Yamamoto, T., E-mail: tetsu_tsukuba@yahoo.co.jp [Department of Neurosurgery, Graduate School of Comprehensive Human Science, University of Tsukuba, Tennodai 1-1-1, Tsukuba (Japan)] [Department of Radiation Oncology, Graduate School of Comprehensive Human Science, University of Tsukuba, Tennodai 1-1-1, Tsukuba (Japan); Nakai, K. [Department of Neurosurgery, Graduate School of Comprehensive Human Science, University of Tsukuba, Tennodai 1-1-1, Tsukuba (Japan); Nariai, T. [Department of Neurosurgery, Tokyo Medical and Dental University, Yushima 1-5-45, Bunkyo-ku, Tokyo (Japan); Kumada, H.; Okumura, T.; Mizumoto, M.; Tsuboi, K. [Department of Radiation Oncology, Graduate School of Comprehensive Human Science, University of Tsukuba, Tennodai 1-1-1, Tsukuba (Japan); Zaboronok, A.; Ishikawa, E.; Aiyama, H.; Endo, K.; Takada, T.; Yoshida, F.; Shibata, Y.; Matsumura, A. [Department of Neurosurgery, Graduate School of Comprehensive Human Science, University of Tsukuba, Tennodai 1-1-1, Tsukuba (Japan)

    2011-12-15

    The phase II trial has been prepared to assess the effectiveness of BPA (250 mg/kg)-based NCT combined with X-ray irradiation and temozolomide (75 mg/m{sup 2}) for the treatment of newly diagnosed GBM. BPA uptake is determined by {sup 18}F-BPA-PET and/or {sup 11}C-MET-PET, and a tumor with the lesion to normal ratio of 2 or more is indicated for BNCT. The maximum normal brain point dose prescribed was limited to 13.0 Gy or less. Primary end point is overall survival.

  3. Statistical Modeling of Large Wind Plant System's Generation - A Case Study

    International Nuclear Information System (INIS)

    Sabolic, D.

    2014-01-01

    This paper presents simplistic, yet very accurate, descriptive statistical models of various static and dynamic parameters of energy output from a large system of wind plants operated by Bonneville Power Administration (BPA), USA. The system's size at the end of 2013 was 4515 MW of installed capacity. The 5-minute readings from the beginning of 2007 to the end of 2013, recorded and published by BPA, were used to derive a number of experimental distributions, which were then used to devise theoretic statistical models with merely one or two parameters. In spite of the simplicity, they reproduced experimental data with great accuracy, which was checked by rigorous tests of goodness-of-fit. Statistical distribution functions were obtained for the following wind generation-related quantities: total generation as percentage of total installed capacity; change in total generation power in 5, 10, 15, 20, 25, 30, 45, and 60 minutes as percentage of total installed capacity; duration of intervals with total generated power, expressed as percentage of total installed capacity, lower than certain pre-specified level. Limitation of total installed wind plant capacity, when it is determined by regulation demand from wind plants, is discussed, too. The models presented here can be utilized in analyses related to power system economics/policy, which is also briefly discussed in the paper. (author).

  4. Late Pleistocene Hansel Valley basaltic ash, northern Lake Bonneville, Utah, USA

    Science.gov (United States)

    Miller, D.M.; Oviatt, Charles G.; Nash, B.P.

    2008-01-01

    The Hansel Valley ash bed lies within 5 cm of the base of deposits of Lake Bonneville (???28 ka) in the vicinity of Great Salt Lake and provides a useful stratigraphic marker for this area of the lake basin. However, it has not been matched to an eruptive edifice, presumably because such an edifice was eroded by waves of Lake Bonneville. We present data for the chemical composition of the tephra and for possible matching lavas and tephras of the region, as well as grain size data for the tephra in an attempt to identify the location of the eruption. Matches with other tephras are negative, but lavas near the coarsest ash deposits match well with the distinctive high values of TiO2 and P2O5 of the ash. Neither chemistry nor grain size data points uniquely to a source area, but an area near the northwest shore of Great Salt Lake and within Curlew Valley is most likely. The Hansel Valley ash is an example of an ash that has no direct numerical date from proximal deposits, despite considerable study, yet nonetheless is useful for stratigraphic studies by virtue of its known stratigraphic position and approximate age. Basaltic tephras commonly are not as widespread as their rhyolitic counterparts, and in some cases apparently are produced by eruptive sources that are short lived and whose edifices are not persistent. ?? 2007 Elsevier Ltd and INQUA.

  5. Holding thermal receipt paper and eating food after using hand sanitizer results in high serum bioactive and urine total levels of bisphenol A (BPA.

    Directory of Open Access Journals (Sweden)

    Annette M Hormann

    Full Text Available Bisphenol A (BPA is an endocrine disrupting environmental contaminant used in a wide variety of products, and BPA metabolites are found in almost everyone's urine, suggesting widespread exposure from multiple sources. Regulatory agencies estimate that virtually all BPA exposure is from food and beverage packaging. However, free BPA is applied to the outer layer of thermal receipt paper present in very high (∼20 mg BPA/g paper quantities as a print developer. Not taken into account when considering thermal paper as a source of BPA exposure is that some commonly used hand sanitizers, as well as other skin care products, contain mixtures of dermal penetration enhancing chemicals that can increase by up to 100 fold the dermal absorption of lipophilic compounds such as BPA. We found that when men and women held thermal receipt paper immediately after using a hand sanitizer with penetration enhancing chemicals, significant free BPA was transferred to their hands and then to French fries that were eaten, and the combination of dermal and oral BPA absorption led to a rapid and dramatic average maximum increase (Cmax in unconjugated (bioactive BPA of ∼7 ng/mL in serum and ∼20 µg total BPA/g creatinine in urine within 90 min. The default method used by regulatory agencies to test for hazards posed by chemicals is intra-gastric gavage. For BPA this approach results in less than 1% of the administered dose being bioavailable in blood. It also ignores dermal absorption as well as sublingual absorption in the mouth that both bypass first-pass liver metabolism. The elevated levels of BPA that we observed due to holding thermal paper after using a product containing dermal penetration enhancing chemicals have been related to an increased risk for a wide range of developmental abnormalities as well as diseases in adults.

  6. Holding thermal receipt paper and eating food after using hand sanitizer results in high serum bioactive and urine total levels of bisphenol A (BPA).

    Science.gov (United States)

    Hormann, Annette M; Vom Saal, Frederick S; Nagel, Susan C; Stahlhut, Richard W; Moyer, Carol L; Ellersieck, Mark R; Welshons, Wade V; Toutain, Pierre-Louis; Taylor, Julia A

    2014-01-01

    Bisphenol A (BPA) is an endocrine disrupting environmental contaminant used in a wide variety of products, and BPA metabolites are found in almost everyone's urine, suggesting widespread exposure from multiple sources. Regulatory agencies estimate that virtually all BPA exposure is from food and beverage packaging. However, free BPA is applied to the outer layer of thermal receipt paper present in very high (∼20 mg BPA/g paper) quantities as a print developer. Not taken into account when considering thermal paper as a source of BPA exposure is that some commonly used hand sanitizers, as well as other skin care products, contain mixtures of dermal penetration enhancing chemicals that can increase by up to 100 fold the dermal absorption of lipophilic compounds such as BPA. We found that when men and women held thermal receipt paper immediately after using a hand sanitizer with penetration enhancing chemicals, significant free BPA was transferred to their hands and then to French fries that were eaten, and the combination of dermal and oral BPA absorption led to a rapid and dramatic average maximum increase (Cmax) in unconjugated (bioactive) BPA of ∼7 ng/mL in serum and ∼20 µg total BPA/g creatinine in urine within 90 min. The default method used by regulatory agencies to test for hazards posed by chemicals is intra-gastric gavage. For BPA this approach results in less than 1% of the administered dose being bioavailable in blood. It also ignores dermal absorption as well as sublingual absorption in the mouth that both bypass first-pass liver metabolism. The elevated levels of BPA that we observed due to holding thermal paper after using a product containing dermal penetration enhancing chemicals have been related to an increased risk for a wide range of developmental abnormalities as well as diseases in adults.

  7. Holding Thermal Receipt Paper and Eating Food after Using Hand Sanitizer Results in High Serum Bioactive and Urine Total Levels of Bisphenol A (BPA)

    Science.gov (United States)

    Hormann, Annette M.; vom Saal, Frederick S.; Nagel, Susan C.; Stahlhut, Richard W.; Moyer, Carol L.; Ellersieck, Mark R.; Welshons, Wade V.; Toutain, Pierre-Louis; Taylor, Julia A.

    2014-01-01

    Bisphenol A (BPA) is an endocrine disrupting environmental contaminant used in a wide variety of products, and BPA metabolites are found in almost everyone’s urine, suggesting widespread exposure from multiple sources. Regulatory agencies estimate that virtually all BPA exposure is from food and beverage packaging. However, free BPA is applied to the outer layer of thermal receipt paper present in very high (∼20 mg BPA/g paper) quantities as a print developer. Not taken into account when considering thermal paper as a source of BPA exposure is that some commonly used hand sanitizers, as well as other skin care products, contain mixtures of dermal penetration enhancing chemicals that can increase by up to 100 fold the dermal absorption of lipophilic compounds such as BPA. We found that when men and women held thermal receipt paper immediately after using a hand sanitizer with penetration enhancing chemicals, significant free BPA was transferred to their hands and then to French fries that were eaten, and the combination of dermal and oral BPA absorption led to a rapid and dramatic average maximum increase (Cmax) in unconjugated (bioactive) BPA of ∼7 ng/mL in serum and ∼20 µg total BPA/g creatinine in urine within 90 min. The default method used by regulatory agencies to test for hazards posed by chemicals is intra-gastric gavage. For BPA this approach results in less than 1% of the administered dose being bioavailable in blood. It also ignores dermal absorption as well as sublingual absorption in the mouth that both bypass first-pass liver metabolism. The elevated levels of BPA that we observed due to holding thermal paper after using a product containing dermal penetration enhancing chemicals have been related to an increased risk for a wide range of developmental abnormalities as well as diseases in adults. PMID:25337790

  8. {sup 11}B-NMR spectroscopic study on the interaction of epinephrine and p-BPA

    Energy Technology Data Exchange (ETDEWEB)

    Ichihara, K.; Yoshino, K. [Shinshu Univ., Department of Chemistry, Matsumoto, Nagano (Japan)

    2000-10-01

    It is studied that p-BPA (p-bronophenylalanine) which formed complex with catechol functional group has interaction with epinephrine by {sup 11}B-NMR. Two {sup 11}B-NMR resonance signals were observed at pH 7.0. The signal at 29.6 ppm is assigned to p-BPA and at 10.8 ppm is assigned to that of complex. We can determine complex formation constants (logK') in various pH. (author)

  9. Bacterial proteasome activator bpa (rv3780) is a novel ring-shaped interactor of the mycobacterial proteasome.

    Science.gov (United States)

    Delley, Cyrille L; Laederach, Juerg; Ziemski, Michal; Bolten, Marcel; Boehringer, Daniel; Weber-Ban, Eilika

    2014-01-01

    The occurrence of the proteasome in bacteria is limited to the phylum of actinobacteria, where it is maintained in parallel to the usual bacterial compartmentalizing proteases. The role it plays in these organisms is still not fully understood, but in the human pathogen Mycobacterium tuberculosis (Mtb) the proteasome supports persistence in the host. In complex with the ring-shaped ATPase Mpa (called ARC in other actinobacteria), the proteasome can degrade proteins that have been post-translationally modified with the prokaryotic ubiquitin-like protein Pup. Unlike for the eukaryotic proteasome core particle, no other bacterial proteasome interactors have been identified to date. Here we describe and characterize a novel bacterial proteasome activator of Mycobacterium tuberculosis we termed Bpa (Rv3780), using a combination of biochemical and biophysical methods. Bpa features a canonical C-terminal proteasome interaction motif referred to as the HbYX motif, and its orthologs are only found in those actinobacteria encoding the proteasomal subunits. Bpa can inhibit degradation of Pup-tagged substrates in vitro by competing with Mpa for association with the proteasome. Using negative-stain electron microscopy, we show that Bpa forms a ring-shaped homooligomer that can bind coaxially to the face of the proteasome cylinder. Interestingly, Bpa can stimulate the proteasomal degradation of the model substrate β-casein, which suggests it could play a role in the removal of non-native or damaged proteins.

  10. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  11. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  12. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  13. Does bisphenol A induce superfeminization in Marisa cornuarietis? Part II: toxicity test results and requirements for statistical power analyses.

    Science.gov (United States)

    Forbes, Valery E; Aufderheide, John; Warbritton, Ryan; van der Hoeven, Nelly; Caspers, Norbert

    2007-03-01

    This study presents results of the effects of bisphenol A (BPA) on adult egg production, egg hatchability, egg development rates and juvenile growth rates in the freshwater gastropod, Marisa cornuarietis. We observed no adult mortality, substantial inter-snail variability in reproductive output, and no effects of BPA on reproduction during 12 weeks of exposure to 0, 0.1, 1.0, 16, 160 or 640 microg/L BPA. We observed no effects of BPA on egg hatchability or timing of egg hatching. Juveniles showed good growth in the control and all treatments, and there were no significant effects of BPA on this endpoint. Our results do not support previous claims of enhanced reproduction in Marisa cornuarietis in response to exposure to BPA. Statistical power analysis indicated high levels of inter-snail variability in the measured endpoints and highlighted the need for sufficient replication when testing treatment effects on reproduction in M. cornuarietis with adequate power.

  14. Contribution of a submerged membrane bioreactor in the treatment of synthetic effluent contaminated by Bisphenol-A: Mechanism of BPA removal and membrane fouling

    International Nuclear Information System (INIS)

    Seyhi, Brahima; Drogui, Patrick; Buelna, Gerardo; Azaïs, Antonin; Heran, Marc

    2013-01-01

    A submerged membrane bioreactor has been operated at the laboratory scale for the treatment of a synthetic effluent containing Bisphenol-A (BPA). COD, NH 4 –N, PO 4 –P and BPA were eliminated respectively, at 99%, 99%, 61% and 99%. The increase of volumetric loading rate from 0 to 21.6 g/m 3 /d did not affect the performance of the MBR system. However, the removal rate decreased rapidly when the BPA loading rate increased above 21.6 g/m 3 /d. The adsorption process of BPA on the biomass was very well described by Freundlich and Langmuir isotherms. Subsequently, biodegradation of BPA occurred and followed the first order kinetic reaction, with a constant rate of 1.13 ± 0.22 h −1 . During treatment, membrane fouling was reversible in the first 84 h of filtration, and then became irreversible. The membrane fouling was mainly due to the accumulation of suspended solid and development of biofilm on the membrane surface. -- Highlights: •High BPA removal rates (up to 99%) were obtained in the MBR. •A limit of the toxicity of 21.6 g/m 3 /d of BPA was recorded for the MBR. •The first order kinetic model described very well the biodegradation process for BPA. •The kinetic rates (0.61–1.13 h −1 ) depend on BPA loading (0.10–0.50 mg/g TSS). •The initial organic loading (0.04 and 0.20 g COD g −1 TSS) did not affect the kinetic. -- High BPA removal rates (up to 99%) were obtained in the MBR, with a limit of the toxicity closed to 21.6 g/m 3 /d of BPA

  15. Staphylococcus aureus host cell invasion and virulence in sepsis is facilitated by the multiple repeats within FnBPA.

    Directory of Open Access Journals (Sweden)

    Andrew M Edwards

    2010-06-01

    Full Text Available Entry of Staphylococcus aureus into the bloodstream can lead to metastatic abscess formation and infective endocarditis. Crucial to the development of both these conditions is the interaction of S. aureus with endothelial cells. In vivo and in vitro studies have shown that the staphylococcal invasin FnBPA triggers bacterial invasion of endothelial cells via a process that involves fibronectin (Fn bridging to alpha(5beta(1 integrins. The Fn-binding region of FnBPA usually contains 11 non-identical repeats (FnBRs with differing affinities for Fn, which facilitate the binding of multiple Fn molecules and may promote integrin clustering. We thus hypothesized that multiple repeats are necessary to trigger the invasion of endothelial cells by S. aureus. To test this we constructed variants of fnbA containing various combinations of FnBRs. In vitro assays revealed that endothelial cell invasion can be facilitated by a single high-affinity, but not low-affinity FnBR. Studies using a nisin-inducible system that controlled surface expression of FnBPA revealed that variants encoding fewer FnBRs required higher levels of surface expression to mediate invasion. High expression levels of FnBPA bearing a single low affinity FnBR bound Fn but did not invade, suggesting that FnBPA affinity for Fn is crucial for triggering internalization. In addition, multiple FnBRs increased the speed of internalization, as did higher expression levels of FnBPA, without altering the uptake mechanism. The relevance of these findings to pathogenesis was demonstrated using a murine sepsis model, which showed that multiple FnBRs were required for virulence. In conclusion, multiple FnBRs within FnBPA facilitate efficient Fn adhesion, trigger rapid bacterial uptake and are required for pathogenesis.

  16. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  17. Dynamics of bisphenol A (BPA) and bisphenol S (BPS) in the European paper cycle: Need for concern?

    DEFF Research Database (Denmark)

    Pivnenko, Kostyantyn; Laner, David; Astrup, Thomas Fruergaard

    2018-01-01

    in toxicological profiles have raised concerns that the use of bisphenol S (BPS) as a substitute for BPA may result in yet another situation of a problematic chemical being distributed in consumer products. This study provides a comprehensive evaluation of the current knowledge of BPA and BPS use in thermal paper...

  18. Vascular parameters continue to decrease post-exposure with simultaneous, but not individual exposure to BPA and hypoxia in zebrafish larvae.

    Science.gov (United States)

    Cypher, Alysha D; Fetterman, Bryce; Bagatto, Brian

    2018-04-01

    How fish respond to hypoxia, a common stressor, can be altered by simultaneous exposure to pollutants like bisphenol A (BPA), a plasticizer. BPA is cardiotoxic and interferes with the hypoxia inducible factor pathway (HIF-1α), therefore disrupting the hypoxic response. Co-exposure to hypoxia and BPA also causes severe bradycardia and reduced cardiac output in zebrafish larvae. The purpose of this work was to determine how the cardiovascular effects of co-exposure vary with BPA concentration and persist beyond exposure. Zebrafish embryos were exposed to 0, 0.01, 0.1, 1, and 100 μg/L of BPA during normoxia (>6.0 mg/L O 2 ) and hypoxia (2.0 ± 0.5 mg/L O 2 ) between 1 h post fertilization (hpf) and late hatching (72-96 hpf). Heart rate, cardiac output, and red blood cell (RBC) velocity were determined through video microscopy and digital motion analysis at late hatching and 10 days post fertilization (dpf), several days post exposure. In comparison to the hypoxic control, RBC velocity was 25% lower with 0.01 μg/L BPA and hypoxia at late hatching. At 10 dpf, the difference in RBC velocity between these treatments doubled, despite several days of recovery. This coincided with a 24% thinner outer diameter for caudal vein but no effect on cardiac or developmental parameters. Statistical interactions between BPA and oxygen concentration were found for arterial RBC velocity at both ages. Because the co-occurrence of both stressors is extremely common, it would be beneficial to understand how BPA and hypoxia interact to affect cardiovascular function during and after exposure. Copyright © 2018 Elsevier Inc. All rights reserved.

  19. Prenatal exposure to BPA alters the epigenome of the rat mammary gland and increases the propensity to neoplastic development.

    Directory of Open Access Journals (Sweden)

    Eugen Dhimolea

    Full Text Available Exposure to environmental estrogens (xenoestrogens may play a causal role in the increased breast cancer incidence which has been observed in Europe and the US over the last 50 years. The xenoestrogen bisphenol A (BPA leaches from plastic food/beverage containers and dental materials. Fetal exposure to BPA induces preneoplastic and neoplastic lesions in the adult rat mammary gland. Previous results suggest that BPA acts through the estrogen receptors which are detected exclusively in the mesenchyme during the exposure period by directly altering gene expression, leading to alterations of the reciprocal interactions between mesenchyme and epithelium. This initiates a long sequence of altered morphogenetic events leading to neoplastic transformation. Additionally, BPA induces epigenetic changes in some tissues. To explore this mechanism in the mammary gland, Wistar-Furth rats were exposed subcutaneously via osmotic pumps to vehicle or 250 µg BPA/kg BW/day, a dose that induced ductal carcinomas in situ. Females exposed from gestational day 9 to postnatal day (PND 1 were sacrificed at PND4, PND21 and at first estrus after PND50. Genomic DNA (gDNA was isolated from the mammary tissue and immuno-precipitated using anti-5-methylcytosine antibodies. Detection and quantification of gDNA methylation status using the Nimblegen ChIP array revealed 7412 differentially methylated gDNA segments (out of 58207 segments, with the majority of changes occurring at PND21. Transcriptomal analysis revealed that the majority of gene expression differences between BPA- and vehicle-treated animals were observed later (PND50. BPA exposure resulted in higher levels of pro-activation histone H3K4 trimethylation at the transcriptional initiation site of the alpha-lactalbumin gene at PND4, concomitantly enhancing mRNA expression of this gene. These results show that fetal BPA exposure triggers changes in the postnatal and adult mammary gland epigenome and alters gene

  20. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  1. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  2. Development of a network-based information infrastructure for fisheries and hydropower information in the Columbia River Basin : Final project report; TOPICAL

    International Nuclear Information System (INIS)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-01-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program

  3. Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.

    Energy Technology Data Exchange (ETDEWEB)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-05-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

  4. Developmental bisphenol A (BPA) exposure leads to sex-specific modification of hepatic gene expression and epigenome at birth that may exacerbate high-fat diet-induced hepatic steatosis

    International Nuclear Information System (INIS)

    Strakovsky, Rita S.; Wang, Huan; Engeseth, Nicki J.; Flaws, Jodi A.; Helferich, William G.; Pan, Yuan-Xiang; Lezmi, Stéphane

    2015-01-01

    Developmental bisphenol A (BPA) exposure increases adulthood hepatic steatosis with reduced mitochondrial function. To investigate the potential epigenetic mechanisms behind developmental BPA-induced hepatic steatosis, pregnant Sprague–Dawley rats were dosed with vehicle (oil) or BPA (100 μg/kg/day) from gestational day 6 until postnatal day (PND) 21. After weaning, offspring were either challenged with a high-fat (HF; 45% fat) or remained on a control (C) diet until PND110. From PND60 to 90, both BPA and HF diet increased the fat/lean ratio in males only, and the combination of BPA and HF diet appeared to cause the highest ratio. On PND110, Oil-HF, BPA-C, and BPA-HF males had higher hepatic lipid accumulation than Oil-C, with microvesicular steatosis being marked in the BPA-HF group. Furthermore, on PND1, BPA increased and modified hepatic triglyceride (TG) and free fatty acid (FFA) compositions in males only. In PND1 males, BPA increased hepatic expression of FFA uptake gene Fat/Cd36, and decreased the expression of TG synthesis- and β-oxidation-related genes (Dgat, Agpat6, Cebpα, Cebpβ, Pck1, Acox1, Cpt1a, Cybb). BPA altered DNA methylation and histone marks (H3Ac, H4Ac, H3Me2K4, H3Me3K36), and decreased the binding of several transcription factors (Pol II, C/EBPβ, SREBP1) within the male Cpt1a gene, the key β-oxidation enzyme. In PND1 females, BPA only increased the expression of genes involved in FFA uptake and TG synthesis (Lpl, Fasn, and Dgat). These data suggest that developmental BPA exposure alters and reprograms hepatic β-oxidation capacity in males, potentially through the epigenetic regulation of genes, and further alters the response to a HF diet. - Highlights: • Developmental BPA exposure exacerbates HF-diet induced steatosis in adult males. • Gestational BPA exposure increases hepatic lipid accumulation in neonatal males. • BPA decreases Cpt1a and other hepatic β-oxidation genes in neonatal males. • BPA alters neonatal male Cpt1a

  5. Developmental bisphenol A (BPA) exposure leads to sex-specific modification of hepatic gene expression and epigenome at birth that may exacerbate high-fat diet-induced hepatic steatosis

    Energy Technology Data Exchange (ETDEWEB)

    Strakovsky, Rita S.; Wang, Huan; Engeseth, Nicki J. [Department of Food Science and Human Nutrition, University of Illinois Urbana-Champaign (United States); Flaws, Jodi A. [Department of Comparative Biosciences, University of Illinois Urbana-Champaign (United States); Helferich, William G. [Department of Food Science and Human Nutrition, University of Illinois Urbana-Champaign (United States); Pan, Yuan-Xiang, E-mail: yxpan@illinois.edu [Department of Food Science and Human Nutrition, University of Illinois Urbana-Champaign (United States); Lezmi, Stéphane, E-mail: slezmi@illinois.edu [Department of Pathobiology, University of Illinois Urbana-Champaign (United States)

    2015-04-15

    Developmental bisphenol A (BPA) exposure increases adulthood hepatic steatosis with reduced mitochondrial function. To investigate the potential epigenetic mechanisms behind developmental BPA-induced hepatic steatosis, pregnant Sprague–Dawley rats were dosed with vehicle (oil) or BPA (100 μg/kg/day) from gestational day 6 until postnatal day (PND) 21. After weaning, offspring were either challenged with a high-fat (HF; 45% fat) or remained on a control (C) diet until PND110. From PND60 to 90, both BPA and HF diet increased the fat/lean ratio in males only, and the combination of BPA and HF diet appeared to cause the highest ratio. On PND110, Oil-HF, BPA-C, and BPA-HF males had higher hepatic lipid accumulation than Oil-C, with microvesicular steatosis being marked in the BPA-HF group. Furthermore, on PND1, BPA increased and modified hepatic triglyceride (TG) and free fatty acid (FFA) compositions in males only. In PND1 males, BPA increased hepatic expression of FFA uptake gene Fat/Cd36, and decreased the expression of TG synthesis- and β-oxidation-related genes (Dgat, Agpat6, Cebpα, Cebpβ, Pck1, Acox1, Cpt1a, Cybb). BPA altered DNA methylation and histone marks (H3Ac, H4Ac, H3Me2K4, H3Me3K36), and decreased the binding of several transcription factors (Pol II, C/EBPβ, SREBP1) within the male Cpt1a gene, the key β-oxidation enzyme. In PND1 females, BPA only increased the expression of genes involved in FFA uptake and TG synthesis (Lpl, Fasn, and Dgat). These data suggest that developmental BPA exposure alters and reprograms hepatic β-oxidation capacity in males, potentially through the epigenetic regulation of genes, and further alters the response to a HF diet. - Highlights: • Developmental BPA exposure exacerbates HF-diet induced steatosis in adult males. • Gestational BPA exposure increases hepatic lipid accumulation in neonatal males. • BPA decreases Cpt1a and other hepatic β-oxidation genes in neonatal males. • BPA alters neonatal male Cpt1a

  6. Clinical results of BNCT for malignant gliomas using BSH and BPA simultaneously

    International Nuclear Information System (INIS)

    Miyatake, Shin-ichi; Kawabata, Shinji; Kajimoto, Yoshinaga

    2006-01-01

    Since 2002 to 2006, we applied BNCT for 41 cases of malignant gliomas. We used 3 different protocols. In each protocol, we used BSH and BPA simultaneously. In protocol 1, BSH 5g/body and BPA 250 mg/kg were used for consecutive 13 cases. Median survival time (MST) of newly diagnosed 4 cases of GB was 23 months after diagnosis. 2 cases were still alive. All cases including recurrent ones showed radiographic improvement. Eight out of 12 cases showed more than 50% mass reduction on images. Major cause of death was CSF dissemination. In protocol 2, BNCT were applied for 4 patients, two times with one to 2 week-interval. MST after BNCT was 13.3 months. In protocol 3, BPA 700 mg/kg were used with 20 to 30 Gy XRT after BNCT. XRT boost was applied especially for deeper part of the tumor. In protocol 3, 6 newly diagnosed GB patients were observed more than 16 months. 3 were dead and 3 were still alive on the preparation of this abstract. MST of these 6 patients was 17.3 months after diagnosis. In each protocol, radiation necrosis was the problem for recurrent cases, while removal of the necrosis prolonged the survival and recovered the neurological deficits. (author)

  7. CTUIR Grande Ronde River Watershed Restoration Program McCoy Creek/McIntyre Creek Road Crossing, 1995-1999 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2000-08-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Bonneville Power Administration (BPA) entered into a contract agreement beginning in 1996 to fund watershed restoration and enhancement actions and contribute to recovery of fish and wildlife resources and water quality in the Grande Ronde River Basin. The CTUIR's habitat program is closely coordinated with the Grande Ronde Model Watershed Program and multiple agencies and organizations within the basin. The CTUIR has focused during the past 4 years in the upper portions of the Grande Ronde Subbasin (upstream of LaGrande, Oregon) on several major project areas in the Meadow, McCoy, and McIntyre Creek watersheds and along the mainstem Grande Ronde River. This Annual Report provides an overview of individual projects and accomplishments.

  8. From lab to field: Geotechnical properties for predicting embankment settlement on Lake Bonneville deposits

    International Nuclear Information System (INIS)

    Hoagland, K.C.; Sampaco, C.L.; Anderson, L.R.; Caliendo, J.A.; Rausher, L.; Keane, E.

    1994-01-01

    The results of a laboratory analysis, to determine geotechnical properties of lacustrine Lake Bonneville deposits, within the I-15 corridor of Salt Lake City, Utah, is presented. Laboratory vertical and horizontal consolidation coefficients are compared with those back-calculated from observed, field settlement data and linear relationships established. The results are used to select vertical and horizontal field coefficients and predict settlement rate of an existing embankment, scheduled for enlargement. 27 refs., 9 figs

  9. Study plan for evaluating carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 2 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one report of four that the Pacific Northwest National Laboratory (PNNL) staff used to address Measure 7.1A in the Northwest Power Planning Council's (Council) fish and Wildlife Program (Program) dated December 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for the development of a study plan based on the critical uncertainties and research needs identified during the evaluation. In the evaluation of carrying capacity the authors concluded that defining capacity and listing the determinants of capacity is not a simple exercise. Capacity is a complex variable among the attributes that all together define salmon performance. To pursue the capacity parameter, that is, a single number or set of numbers that quantify how many salmon the basin or any part of the basin can support, will not lead to the development of a useful study plan. To increase understanding of ecology, carrying capacity, and limiting factors, it is necessary to deal with the complexity of the sustained performance of salmon in the Columbia River Basin. This report describes the elements of a study plan that could be used to increase the understanding of ecology, carrying capacity, and limiting factors that influence salmon survival under current conditions

  10. Superconducting magnetic energy storage (SMES) program. Progress report, January 1-December 31, 1980

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1981-03-01

    Work is reported on the development of two superconducting magnetic energy storage (SMES) units. One is a 30-MJ unit for use by the Bonneville Power Administration (BPA) to stabilize power oscillations on their Pacific AC Intertie, and the second is a 1- to 10-GWh unit for use as a diurnal load leveling device. Emphasis has been on the stabilizing system. The manufacturing phase of the 30-MJ superconducting coil was initiated and the coil fabrication has advanced rapidly. The two converter power transformers were manufactured, successfully factory tested, and shipped. One transformer reached the Tacoma Substation in good condition; the other was dropped enroute and has been returned to the factory for rebuilding. Insulation of the 30-MJ coil has been examined for high voltage effects apt to be caused by transients such as inductive voltage spikes from the protective dump circuit. The stabilizing system converter and protective energy dump system were completed, factory tested, and delivered

  11. Antelope--Fossil rebuild project

    International Nuclear Information System (INIS)

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project

  12. Tests of the 30-MJ superconducting magnetic-energy storage unit

    International Nuclear Information System (INIS)

    Boenig, H.J.; Dean, J.W.; Rogers, J.D.; Schermer, R.I.; Hauer, J.F.

    1983-01-01

    A 30-MJ (8.4 kWh) superconducting magnetic energy storage (SMES) unit with a 10-MW converter was installed during the later months of 1982 at the Bonneville Power Administration (BPA) Tacoma substation in Tacoma, Washington. The unit, which is capable of absorbing and releasing up to 10 MJ of energy at a frequency of 0.35 Hz, was designed to damp the dominant power swing mode of the Pacific AC Intertie. Extensive tests were performed with the unit during the first half of 1983. This paper will review the major components of the storage unit and describe the startup and steady state operating experience with the coil, dewar, refrigerator and converter. The unit has absorbed power up to a level of 11.8 Mw. Real power was modulated following a sinusoidal power demand with frequencies from 0.1 to 1.2 Hz and a power level up to +- 8.3 MW. The unit has performed in accordance with design expectations and no major problems have developed

  13. Evaluation of the toxic effect of endocrine disruptor Bisphenol A (BPA) in the acute and chronic toxicity tests with Pomacea lineata gastropod.

    Science.gov (United States)

    de Andrade, André Lucas Correa; Soares, Priscila Rafaela Leão; da Silva, Stephannie Caroline Barros Lucas; da Silva, Marília Cordeiro Galvão; Santos, Thamiris Pinheiro; Cadena, Marilia Ribeiro Sales; Soares, Pierre Castro; Cadena, Pabyton Gonçalves

    2017-07-01

    Bisphenol A (BPA) is a plasticizer and a risk when it interacts with organisms, and can cause changes in the development and reproduction of them. This study aimed to evaluate the effects of BPA, by acute and chronic toxicity tests with neonates and adults of Pomacea lineata. Adults and neonates were divided into groups exposed to BPA (1-20mg/L), or 17β-estradiol (1mg/L) and control in the acute and chronic toxicity tests. Behavior, heart rate, reproduction and hemolymph biochemical analysis were measured. In the acute toxicity test, the 96-h LC 50 with adults was 11.09 and with neonates was 3.14mg/L. In this test, it was observed lethargic behavior and an increase of 77.6% of aspartate aminotransferase in the adults' hemolymph (ptest, it was observed behaviors associated with reproduction, as Copulate, in the groups exposed to BPA. The results that were found in this study proved that BPA is a potentially toxic agent to Pomacea lineata according to biological parameters evaluated. These data contribute to the understanding of BPA toxic effects' in the aquatic invertebrates. Copyright © 2017 Elsevier Inc. All rights reserved.

  14. Models for estimation of the 10B concentration after BPA-fructose complex infusion in patients during epithermal neutron irradiation in BNCT

    International Nuclear Information System (INIS)

    Ryynaenen, Paeivi M.; Kortesniemi, Mika; Coderre, Jeffrey A.; Diaz, Aidnag Z.; Hiismaeki, Pekka; Savolainen, Sauli E.

    2000-01-01

    Purpose: To create simple and reliable models for clinical practice for estimating the blood 10 B time-concentration curve after p-boronophenylalanine fructose complex (BPA-F) infusion in patients during neutron irradiation in boron neutron capture therapy (BNCT). Methods and Materials: BPA-F (290 mg BPA/kg body weight) was infused i.v. during two hours to 10 glioblastoma multiforme patients. Blood samples were collected during and after the infusion. Compartmental models and bi-exponential function fit were constructed based on the 10 B blood time-concentration curve. The constructed models were tested with data from six additional patients who received various amounts of infused BPA-F and data from one patient who received a one-hour infusion of 170 mg BPA/kg body weight. Results: The resulting open two-compartment model and bi-exponential function estimate the clearance of 10 B after 290 mg BPA/kg body weight infusion from the blood with satisfactory accuracy during the first irradiation field (1 ppm, i.e., 7%). The accuracy of the two models in predicting the clearance of 10 B during the second irradiation field are for two-compartment model 1.0 ppm (8%) and 0.2 ppm (2%) for bi-exponential function. The models predict the average blood 10 B concentration with an increasing accuracy as more data points are available during the treatment. Conclusion: By combining the two models, a robust and practical modeling tool is created for the estimation of the 10 B concentration in blood after BPA-F infusion

  15. Enhancing Skin Permeation of Biphenylacetic Acid (BPA) Using Salt Formation with Organic and Alkali Metal Bases

    OpenAIRE

    PAWAR, Vijay; NAIK, Prashant; GIRIDHAR, Rajani; YADAV, Mange Ram

    2014-01-01

    In the present study, a series of organic and alkali metal salts of biphenylacetic acid (BPA) have been prepared and evaluated in vitro for percutaneous drug delivery. The physicochemical properties of BPA salts were determined using solubility measurements, DSC, and IR. The DSC thermogram and FTIR spectra confirmed the salt formation with organic and alkali metal bases. Among the series, salts with organic amines (ethanolamine, diethanolamine, triethanol-amine, and diethylamine) had lowered ...

  16. Estrogenic effects of several BPA analogs in the developing zebrafish brain

    Directory of Open Access Journals (Sweden)

    Joel eCano-Nicolau

    2016-03-01

    Full Text Available Important set of studies have demonstrated the endocrine disrupting activity of Bisphenol A (BPA. The present work aimed at defining estrogenic-like activity of several BPA structural analogs, including BPS, BPF, BPAF, and BPAP, on 4-day or 7-day post-fertilization (dpf zebrafish larva as an in vivo model. We measured the induction level of the estrogen-sensitive marker cyp19a1b gene (Aromatase B, expressed in the brain, using three different in situ/in vivo strategies: 1 Quantification of cyp19a1b transcripts using RT-qPCR in wild type 7-dpf larva brains exposed to bisphenols ; 2 Detection and distribution of cyp19a1b transcripts using in situ hybridization on 7-dpf brain sections (hypothalamus; and 3 Quantification of the cyp19a1b promoter activity in live cyp19a1b-GFP transgenic zebrafish (EASZY assay at 4-dpf larval stage. These three different experimental approaches demonstrated that BPS, BPF or BPAF exposure, similarly to BPA, significantly activates the expression of the estrogenic marker in the brain of developing zebrafish. In vitro experiments using both reporter gene assay in a glial cell context and competitive ligand binding assays strongly suggested that up-regulation of cyp19a1b is largely mediated by the zebrafish estrogen nuclear receptor alpha (zfERα. Importantly, and in contrast to other tested bisphenol A analogs, the bisphenol AP (BPAP did not show estrogenic activity in our model.

  17. Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN

    International Nuclear Information System (INIS)

    Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

    1996-11-01

    The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG ampersand E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it's new marketing plan

  18. CLARITY-BPA: Effects of chronic Bisphenol A exposure on the immune system: Part 1 - Quantification of the relative number and proportion of leukocyte populations in the spleen and thymus.

    Science.gov (United States)

    Li, Jinpeng; Bach, Anthony; Crawford, Robert B; Phadnis-Moghe, Ashwini S; Chen, Weimin; D'Ingillo, Shawna; Kovalova, Natalia; Suarez-Martinez, Jose E; Zhou, Jiajun; Kaplan, Barbara L F; Kaminski, Norbert E

    2018-03-01

    Bisphenol A (BPA) is extensively used in manufacturing of a broad range of consumer products worldwide. Due to its widespread use, human exposure to BPA is virtually ubiquitous. Broad human exposure coupled with a large scientific literature describing estrogenic activity of BPA in animals has raised public health concerns. To comprehensively evaluate the health effects of BPA exposure, a chronic toxicity study using a wide-range of BPA doses (2.5-25000 μg/kg bw/day) was conducted jointly by the NTP, thirteen NIEHS-supported grantees, and the FDA, which is called the Consortium Linking Academic and Regulatory Insights on Toxicity of BPA (CLARITY-BPA). As a participant in the CLARITY-BPA project, the objective of the current study was to evaluate the effects of chronic BPA exposure in Sprague-Dawley rats on the relative number and proportion of defined leukocyte populations in the spleen and the thymus. Toward this end, lymphoid tissues from a total of 641 rats were assayed after being continuously dosed with BPA or controls for up to one year. To comprehensively evaluate the effects of BPA on leukocyte compositions, extensive endpoints that cover major populations of leukocytes were assessed, including B cells, T cells, NK cells, granulocytes, monocytes, macrophages and dendritic cells. In total, of the 530 measurements in BPA-treated rats, 10 measurements were statistically different from vehicle controls and were mainly associated with either the macrophage or dendritic cell populations. Most, if not all, of these alterations were found to be transient with no persistent trend over the one-year time period. In addition, the observed BPA-associated alterations were mostly moderate in magnitude and not dose-dependent. Due to the aforementioned, it is unlikely that the observed BPA-mediated changes alone would adversely affect immune competence. Copyright © 2018 Elsevier B.V. All rights reserved.

  19. 18 CFR 301.3 - Filing procedures.

    Science.gov (United States)

    2010-04-01

    ... FOR SALES FROM UTILITIES TO BONNEVILLE POWER ADMINISTRATION UNDER NORTHWEST POWER ACT § 301.3 Filing procedures. (a) Bonneville's ASC review procedures. The procedures established by Bonneville's Administrator... Bonneville's ASC review procedures. (b) Exchange Period. The Exchange Period will be equal to the term of...

  20. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  1. Relative survival of juvenile chinook salmon (Oncorhynchus tshawyischa) through a Bonneville dam on the Columbia River

    International Nuclear Information System (INIS)

    Ferguson, J.

    1993-01-01

    The Bonneville Dam second powerhouse bypass system for juvenile salmon has one 6.1-m submersible travelling screen in each intake of all eight turbines, for a total of 24 screens. These screens set up a hydraulic cushion that deflects juvenile salmon away from the turbine intakes and into vertical bulkhead slots, from which they exit by their own volition into a collection gallery that travels the length of the powerhouse to a dewatering station and the outlet. A multiple-year evaluation was conducted on the comparative survival of subyearling chinook salmon through various passage modes at the dam. Using this information, operational scenarios could then be formulated to provide additional juvenile protection while meeting power system demands. In the summer, the juvenile salmon that passed through the bypass system had significantly lower survival rates than upper and lower turbine, spillway, and downstream control groups. Predation by northern squawfish (Ptychocheilus oregonensis) was suspected to have been the cause of high mortalities among bypassed fish. No significant differences existed between survival rates of upper and lower turbine groups. 7 refs., 2 figs., 1 tab

  2. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  3. Wind River Watershed Restoration, 2006-2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, Patrick J.; Jezorek, Ian G.; Munz, Carrie S. [U.S. Geological Survey

    2008-11-04

    This report summarizes work completed by U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) in the Wind River subbasin during the period April 2006 through March 2007 under Bonneville Power Administration (BPA) contract 26922. During this period, we collected temperature, flow, and habitat data to characterize physical habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. We also conducted electrofishing and snorkeling surveys to determine juvenile salmonid populations within select study areas throughout the subbasin. Portions of this work were completed with additional funding from U.S. Fish and Wildlife Service (USFWS) and the Lower Columbia Fish Enhancement Group (LCFEG). Funding from USFWS was for work to contribute to a study of potential interactions between introduced Chinook salmon Oncorhynchus tshawytscha and wild steelhead O. mykiss. Funding from LCFEG was for work to evaluate the effects of nutrient enrichment in small streams. A statement of work (SOW) was submitted to BPA in March 2006 that outlined work to be performed by USGS-CRRL. The SOW was organized by work elements, with each describing a research task. This report summarizes the progress completed under each work element.

  4. Washington Windplant No. 1: Botanical resources field survey. Appendix B to Washington Windplant No. 1 EIS

    International Nuclear Information System (INIS)

    1994-12-01

    KENETECH Windpower, Inc., has applied to Klickitat County for a conditional use permit to construct and operate a 115 Megawatt windfarm on an approximately 5110 hectare (12,630 acre) site in the Columbia Hills near Goldendale, Washington. A transmission services agreement between the Bonneville Power Administration (BPA) and utilities purchasing the Project's output will also be required. Klickitat County and BPA initiated the preparation of a joint SEPA/NEPA Environmental Impact Statement, under the authority of the Washington State Environmental Policy Act and the National Environmental Policy Act. The EIS addresses, among other issues, the Project's potential impact on rare, threatened or endangered, and sensitive plant species and communities as well as plant species of potential cultural importance. A field survey along potential impact corridors (turbine strings, roadways, and the transmission line alignment) was conducted between April and June, 1994 in order to identify rare plant species, high-quality native plant communities, and plant species of potential cultural importance present in these corridors. In addition, habitat maps of the entire 5110-ha project area were field verified. This report contains the results of that survey and an assessment of the potential project impacts

  5. A cancer research UK pharmacokinetic study of BPA-mannitol in patients with high grade glioma to optimise uptake parameters for clinical trials of BNCT

    International Nuclear Information System (INIS)

    Green, S.; James, N.D.; Cruickshank, G.S.

    2006-01-01

    This presentation will describe a human pharmacokinetic study which is scheduled to begin recruitment in Summer 2006. The study has been ongoing for approximately 4 years to develop the necessary protocols, validate boron assays and to develop a new formulation of BPA. The study population will be patients with glioblastoma multiforme and the study focuses on the route of infusion (intra venous or intra carotid artery) and in each will assess the effect of administration of mannitol (as a blood-brain barrier disrupter). Mannitol will be administered as a bolus at the beginning of a two hour infusion of BPA. The BPA formulation (BPA - mannitol) is also new and avoids some of the problems of low solubility associated with BPA-fructose as well as the potential risk of fructose intolerance. The approach will include stereotactic biopsy which is necessary to confirm diagnosis. Tissue samples collected will include needle biopsy samples of tumour and brain around tumour for estimation of BPA transporter expression, together with microdialysis catheter collection of extra-cellular fluid and routine collection of blood and urine for BPA levels. Where possible, according to surgical plan and the route of entry, samples of cerebro-spinal will also be collected. These data will be used to develop a pharmacokinetic model following the general approach already established by others in the field. This paper presents initial pre-clinical studies on the BPA-mannitol formulation and some assay validation work together with suggestions for approaches to normalisation of the macroscopic boron assays using simultaneous measurement of Mg levels in tissue. (author)

  6. 1993 Pacific Northwest Loads and Resources Study.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-12-01

    The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

  7. Hydrology and surface morphology of the Bonneville Salt Flats and Pilot Valley Playa, Utah

    Science.gov (United States)

    Lines, Gregory C.

    1979-01-01

    The Bonneville Salt Flats and Pilot Valley are in the western part of the Great Salt Lake Desert in northwest Utah. The areas are separate, though similar, hydrologic basins, and both contain a salt crust. The Bonneville salt crust covered about 40 square miles in the fall of 1976, and the salt crust in Pilot Valley covered 7 square miles. Both areas lack any noticeable surface relief (in 1976, 1.3 feet on the Bonneville salt crust and 0.3 foot on the Pilot Valley salt crust).The salt crust on the Salt Flats has been used for many years for automobile racing, and brines from shallow lacustrine deposits have been used for the production of potash. In recent years, there has been an apparent conflict between these two major uses of the area as the salt crust has diminished in both thickness and extent. Much of the Bonneville Racetrack has become rougher, and there has also been an increase in the amount of sediment on the south end of the racetrack. The Pilot Valley salt crust and surrounding playa have been largely unused.Evaporite minerals on the Salt Flats and the Pilot Valley playa are concentrated in three zones: (1) a carbonate zone composed mainly of authigenic clay-size carbonate minerals, (2) a sulfate zone composed mainly of authigenic gypsum, and (3) a chloride zone composed of crystalline halite (the salt crust). Five major types of salt crust were recognized on the Salt Flats, but only one type was observed in Pilot Valley. Geomorphic differences in the salt crust are caused by differences in their hydrologic environments. The salt crusts are dynamic features that are subject to change because of climatic factors and man's activities.Ground water occurs in three distinct aquifers in much of the western Great Salt Lake Desert: (1) the basin-fill aquifer, which yields water from conglomerate in the lower part of the basin fill, (2) the alluvial-fan aquifer, which yields water from sand and gravel along the western margins of both playas, and (3) the

  8. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  9. Hydromania II: Journey of the Oncorhynchus. Summer Science Camp Curriculum 1994.

    Energy Technology Data Exchange (ETDEWEB)

    Moura, Joan; Swerin, Rod

    1995-01-01

    The Hydromania II curriculum was written for the third in a series of summer science camp experiences targeting students in grades 4--6 who generally have difficulty accessing supplementary academic programs. The summer science camp in Portland is a collaborative effort between Bonneville Power Administration (BPA), the US Department of Energy (DOE), and the Portland Parks and Recreation Community Schools Program along with various other cooperating businesses and organizations. The curriculum has also been incorporated into other summer programs and has been used by teachers to supplement classroom activities. Camps are designed to make available, affordable learning experiences that are fun and motivating to students for the study of science and math. Inner-city, under-represented minorities, rural, and low-income families are particularly encouraged to enroll their children in the program.

  10. A Study to Determine the Biological Feasibility of a New Fish Tagging System : Annual Report 1990-1993.

    Energy Technology Data Exchange (ETDEWEB)

    Prentice, Earl F.; Maynard, D.J.; Downing, S.L. (and others)

    1994-01-01

    In 1983, the National Marine Fisheries Service (NMFS) began a multiyear cooperative research program with the Bonneville Power Administration (BPA) to evaluate a new miniaturized identification system that could be used with salmonids. The system is referred to as the passive-integrated-transponder (PIT) tagging and interrogation system. The program has focused on determining the effects of PIT tags on juvenile and adult salmonids, as well as the development and evaluation of tagging and interrogation methods. Earlier results of the program have been reported in annual reports and journal articles cited in this report. This report covers the work per formed from 1990 through 1993. For convenience, the report is divided into three sections: (1) Interrogation and separation systems at Columbia River Basin dams; (2) Systems development and evaluation; and (3) Information and technology transfer.

  11. Lake Roosevelt Fisheries Monitoring Program; 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L.; Scholz, Allan T.; Griffith, James R.

    1990-10-01

    In the Northwest Power Planning Council's 1987 Columbia River Basin Fish and Wildlife Program (NPPC 1987), the Council directed the Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries as partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam [Section 903 (g)(l)(C)]. The hatcheries will produce kokanee salmon for outplanting into Lake Roosevelt as well as rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen program. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. The monitoring program included the following components: (1) a year-round, reservoir-wide, creel survey to determine angler use, catch rates and composition, and growth and condition of fish; (2) assessment of kokanee, rainbow, and walleye (Stizostedion vitreum) feeding habits and densities of their preferred prey, and; (3) a mark and recapture study designed to assess the effectiveness of different locations where hatchery-raised kokanee and net pen reared rainbow trout are released. The above measures were adopted by the Council based on a management plan, developed by the Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and National Park Service, that examined the feasibility of restoring and enhancing Lake Roosevelt fisheries (Scholz et al. 1986). In July 1988, BPA entered into a contract with the Spokane Indian Tribe to initiate the monitoring program. The projected duration of the monitoring program is through 1995. This report contains the results of the monitoring program from August 1988 to December 1989.

  12. 1998 BPA habitat projects completed within the Asotin Creek Watershed, WA; Ridge-Top to Ridge-Top Habitat Projects; 1998 BPA Completion Report - November 1999

    International Nuclear Information System (INIS)

    Johnson, Bradley J.

    2000-01-01

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred forty-six projects have been implemented through the ACMWP as of 1998. Fifty-nine of these projects were funded in part through Bonneville Power Administration's 1998 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; one hundred thirty-nine pools were created with these structures. Three miles of stream benefited from riparian improvements such as fencing, vegetative plantings, and noxious weed control. Two alternative water developments were completed, providing off-stream-watering sources for livestock. 20,500 ft of upland terrace construction, seven sediment basin construction, one hundred eighty-seven acres of grass seeding, eight hundred fifty acres of direct seeding and eighteen sediment basin cleanouts were implemented to reduce sediment production and delivery to streams in the watershed

  13. Biodistribution study with combined administration of BPA and BSH for BNCT in the hamster cheek pouch oral cancer model

    International Nuclear Information System (INIS)

    Garabalino, M A; Heber, E M; Monti Hughes, A; Pzzi, E C C; Molinari, A J; Niggg, D W; Bauer, W; Trivillin, V A; Schwint, A E

    2012-01-01

    We previously proved the therapeutic potential of the chemically non-selective boron compound decahydrodecaborate (GB-10) as a stand-alone boron carrier for BNCT in the hamster cheek pouch oral cancer model with no toxic effects in normal or precancerous tissue. Although GB-10 is not taken up selectively by oral tumor tissue, selective tumor lethality would result from selective aberrant tumor blood vessel damage. Furthermore, BNCT efficacy was enhanced when GB-10 and boronophenylalanine (BPA) were administered jointly. The fact that sodium mercaptoundecahydro-closo-dodecaborate (BSH) is being investigated clinically as a stand-alone boron agent for BNCT of brain tumors and in combination with BPA for recurrent head and neck malignancies makes it a particularly interesting boron compound to explore. Based on the working hypothesis that BSH would conceivably behave similarly to GB-10 in oral cancer, we previously performed biodistribution studies with BSH alone in the hamster cheek pouch oral cancer model. The aim of the present study was to perform biodistribution studies of BSH + BPA administered jointly in the hamster cheek pouch oral cancer model as a starting point to contribute to the knowledge of (BSH+BPA)-BNCT radiobiology and optimize therapeutic efficacy. The right cheek pouch of Syrian hamsters was subjected to topical administration of a carcinogen twice a week for 12 weeks. Once the exophytic tumors, i.e. squamous cell carcinomas, had developed, the animals were used for biodistribution studies with BSH + BPA. Three administration protocols with different proportions of each of the compounds were assessed: 1. BSH, 50 mg 10 B/kg, iv + BPA, 15.5 mg 10 B/kg, ip; 2. BSH, 34.5 mg 10 B/kg, iv + BPA, 31 mg 10 B/kg, ip; 3. BSH, 20 mg 10 B/kg, iv + BPA, 46.5 mg 10 B/kg, ip. Groups of animals were euthanized 4 h after the administration of BSH and 3 h after the administration of BPA. Samples of blood, tumor, precancerous and normal pouch and other tissues with

  14. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  15. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  16. Analytical determination of bisphenol A (BPA) and bisphenol analogues in paper products by GC-MS/MS.

    Science.gov (United States)

    Jurek, A; Leitner, E

    2017-07-01

    Bisphenol A (BPA; 4-[2-(4-hydroxyphenyl)propan-2-yl]phenol), a suspected endocrine disruptor with a weak estrogenic activity, is used in a variety of consumer products, including food-contact materials made of paper and cardboard products. Due to restrictions on the use of BPA because of its potential health risks, BPA is gradually being replaced by other bisphenols because no limitations exist for these substances. This study presents a method for the simultaneous analysis of BPA, bisphenol AF (BPAF), bisphenol B (BPB), bisphenol E (BPE), bisphenol F (BPF) and bisphenol S (BPS) in paper and board products using gas chromatography-tandem mass spectrometry (GC-MS/MS). Paper samples were extracted by liquid extraction, as well as by Folch extraction, derivatised with N,O-bis(trimethylsilyl)trifluoroacetamide (BSTFA) and the results compared. The developed method showed good linearity (R 2  > 0.9965) and precision, yielding relative standard deviations (RSDs) of less than 16.6% for reproducibility and 19.8% for repeatability. The limits of detection and limits of quantification for the different bisphenols ranged from 0.23 to 2.70 µg kg - 1 paper and from 0.78 to 9.10 µg kg - 1 paper, respectively. Analysis of different paper products (recycled, virgin fibre) showed that all the analysed bisphenols were present in the samples, except for BPAF and BPB. A calculation of the 'worst-case' scenario assuming a maximum potential migration of 100% of the analytes into food showed that the analysed products can be assumed to be safe regarding the migration of bisphenols.

  17. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  18. Impact of low-dose chronic exposure to Bisphenol A (BPA) on adult male zebrafish adaption to the environmental complexity: Disturbing the color preference patterns and reliving the anxiety behavior.

    Science.gov (United States)

    Li, Xiang; Sun, Ming-Zhu; Li, Xu; Zhang, Shu-Hui; Dai, Liang-Ti; Liu, Xing-Yu; Zhao, Xin; Chen, Dong-Yan; Feng, Xi-Zeng

    2017-11-01

    The extensive usage of xenobiotic endocrine disrupting chemicals (XEDCs), such as Bisphenol A (BPA), has created obvious threat to aquatic ecosystems worldwide. Although a comprehensive understanding of the adverse effect of BPA on behaviors and physiology have been proven, the potential impact of low-dose BPA on altering the basic ability of aquatic organism in adapting to the surrounded complex environment still remains elusive. In this research, we report that treatment of adult male zebrafish with chronic (7 weeks) low-dose (0.22 nM-2.2 nM) BPA, altered the ability in adapting the complex environment by disturbing the natural color preference patterns. In addition, chronic 50 ng/L (0.22 nM) BPA exposure alleviated the anxiety behavior of male zebrafish confronted with the novel environment by enhancing the preference towards light in the light/dark preference test. This phenotype was associated with less expression of serotonin (5-TH) in the hypothalamus and the down-regulation of tyrosine hydroxylase (TH) in brain tissues. As such, our results show that low-dose BPA remnant in surface waters altered zebrafish behavior that are known to have ecological and evolutionary consequences. Here we reported that the impact of chronic low-dose BPA exposure on the basic capability of zebrafish to adapt to the environmental complexity. Specifically, BPA at low concentration, under the environmental safety level and 3000-fold lower than the accepted human daily exposure, interfered with the ability to discriminate color and alleviate anxiety induced by the novel environment, which finally altered the capability of male zebrafish to adapt to the environmental complexity. These findings revealed the ecological effect of low-dose BPA and regular BPA concentration standard are not necessarily safe. The result also provided the consideration of retuning the hazard concentration level of BPA. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Keeping current, June 1998. Issues 98: Securing the value of the federal Columbia River power system

    International Nuclear Information System (INIS)

    1998-06-01

    This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management

  20. Securing the Value of the Federal Columbia River Power System, Keeping Current, June 1998, Issue 98.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-06-01

    This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management.

  1. Radiobiology of BNCT mediated by GB-10 and GB-10+BPA in experimental oral cancer

    Energy Technology Data Exchange (ETDEWEB)

    Trivillin, Veronica A.; Heber, Elisa M.; Itoiz, Maria E.; Nigg, David; Calzetta, Osvaldo; Blaumann, Herman; Longhino, Juan; Schwint, Amanda E. E-mail: schwint@cnea.gov.ar

    2004-11-01

    We previously reported biodistribution and pharmacokinetic data for GB-10 (Na{sub 2}{sup 10}B{sub 10}H{sub 10}) and the combined administration of GB-10 and boronophenylalanine (BPA) as boron delivery agents for boron neutron capture therapy (BNCT) in the hamster cheek pouch oral cancer model. The aim of the present study was to assess, for the first time, the response of hamster cheek pouch tumors, precancerous tissue and normal tissue to BNCT mediated by GB-10 and BNCT mediated by GB-10 and BPA administered jointly using the thermalized epithermal beam of the RA-6 Reactor at the Bariloche Atomic Center. GB-10 exerted 75.5% tumor control (partial+complete remission) with no damage to precancerous tissue around tumor or to normal tissue. Thus, GB-10 proved to be a therapeutically efficient boron agent in this model despite the fact that it is not taken up selectively by oral tumor tissue. GB-10 exerted a selective effect on tumor blood vessels leading to significant tumor control with a sparing effect on normal tissue. BNCT mediated by the combined administration of GB-10 and BPA resulted in a reduction in the dose to normal tissue and would thus allow for significant escalation of dose to tumor without exceeding normal tissue tolerance.

  2. Radiobiology of BNCT mediated by GB-10 and GB-10+BPA in experimental oral cancer

    International Nuclear Information System (INIS)

    Trivillin, Veronica A.; Heber, Elisa M.; Itoiz, Maria E.; Nigg, David; Calzetta, Osvaldo; Blaumann, Herman; Longhino, Juan; Schwint, Amanda E.

    2004-01-01

    We previously reported biodistribution and pharmacokinetic data for GB-10 (Na 2 10 B 10 H 10 ) and the combined administration of GB-10 and boronophenylalanine (BPA) as boron delivery agents for boron neutron capture therapy (BNCT) in the hamster cheek pouch oral cancer model. The aim of the present study was to assess, for the first time, the response of hamster cheek pouch tumors, precancerous tissue and normal tissue to BNCT mediated by GB-10 and BNCT mediated by GB-10 and BPA administered jointly using the thermalized epithermal beam of the RA-6 Reactor at the Bariloche Atomic Center. GB-10 exerted 75.5% tumor control (partial+complete remission) with no damage to precancerous tissue around tumor or to normal tissue. Thus, GB-10 proved to be a therapeutically efficient boron agent in this model despite the fact that it is not taken up selectively by oral tumor tissue. GB-10 exerted a selective effect on tumor blood vessels leading to significant tumor control with a sparing effect on normal tissue. BNCT mediated by the combined administration of GB-10 and BPA resulted in a reduction in the dose to normal tissue and would thus allow for significant escalation of dose to tumor without exceeding normal tissue tolerance

  3. 18 CFR 301.2 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... SALES FROM UTILITIES TO BONNEVILLE POWER ADMINISTRATION UNDER NORTHWEST POWER ACT § 301.2 Definitions... Period ASC. Average System Cost review process (ASC review process). The administrative proceeding conducted before Bonneville under Bonneville's ASC review procedures in which a Utility's ASC is determined...

  4. BPA review of Washington Public Power Supply System, Projects 1 and 3 (WNP 1 and 3), construction schedule and financing assumptions

    International Nuclear Information System (INIS)

    1984-01-01

    This document contains the following appendices: Data provided By Supply System Regarding Costs and Schedules; Basic Supply System Data and Assumptions; Detailed Modeling of Net Present Values; Origin and Detailed Description of the System Analysis Mode; Decision Analysis Model; Pro Forma Budget Expenditure Levels for Fiscal years 1984 through 1990; Financial Flexibility Analysis - Discretionary/Nondiscretionary Expenditure Levels; Detailed Analysis of BPA's Debt Structure Under the 13 Pro Forma Budget Scenarios for Fiscal Years 1984 through 1990; Wertheim and Co., Inc., August 30, 1984 Letter; Project Considerations and Licensing/Regulatory Issues, Supply System September 15, 1984 Letter; and Summary of Litigation Affecting WNP 1 and 3, and WNP 4 and 5

  5. Significance of Selective Predation and Development of Prey Protection Measures for Juvenile Salmonids in the Columbia and Snake River Reservoirs: Annual Progress Report, February 1991-February 1992.

    Energy Technology Data Exchange (ETDEWEB)

    Poe, Thomas P.

    1992-12-31

    This document is the 1991 annual report of progress for the Bonneville Power Administration (BPA) research Project conducted by the US Fish and Wildlife Service (FWS). Our approach was to present the progress achieved during 1991 in a series of separate reports for each major project task. Each report is prepared in the format of a scientific paper and is able to stand alone, whatever the state of progress or completion. This project has two major goals. One is to understand the significance of selective predation and prey vulnerability by determining if substandard juvenile salmonids (dead, injured, stressed, diseased, or naive) are more vulnerable to predation by northern squawfish, than standard or normal juvenile salmonids. The second goal is to develop and test prey protection measures to control predation on juvenile salmonids by reducing predator-smolt encounters or predator capture efficiency.

  6. Boron biodistribution for BNCT in the hamster cheek pouch oral cancer model: Combined administration of BSH and BPA

    Energy Technology Data Exchange (ETDEWEB)

    D.W. Nigg; William Bauer; Various Others

    2014-06-01

    Sodium mercaptoundecahydro-closo-dodecaborate (BSH) is being investigated clinically for BNCT. We examined the biodistribution of BSH and BPA administered jointly in different proportions in the hamster cheek pouch oral cancer model. The 3 assayed protocols were non-toxic, and showed preferential tumor boron uptake versus precancerous and normal tissue and therapeutic tumor boron concentration values (70–85 ppm). All 3 protocols warrant assessment in BNCT studies to contribute to the knowledge of (BSH+BPA)-BNCT radiobiology for head and neck cancer and optimize therapeutic efficacy.

  7. BPA and BSH accumulation in experimental tumors

    International Nuclear Information System (INIS)

    Patel, H.; Sedgwick, E.M.

    2000-01-01

    The accumulation of boronated compounds into tumors is a critical component to the success of BNCT. To date, great variability has been demonstrated in the tumor:blood ratio achieved in samples both from different patients and within samples taken from the same patient. The factors that probably influence the level of uptake include the vascular perfusion within the tumor, the permeability of these vessels and the viability of the tumor cells themselves. These experiments were designed to measure these various factors in different experimental tumor models and to relate these measurements to the uptake of both BPA (Boronophenylalanine) and BSH (Sodiumborocaptate). They demonstrate that within different tumors there can be wide variations in the vascular parameters. In addition, the viability of the tumor cells may also be an important determinant of tumor uptake. (author)

  8. 10B-NMR determination of 10B-BPA, 10B-BPA–fructose complex and total 10B in blood for BNCT

    International Nuclear Information System (INIS)

    Yoshino, K.; Yabe, T.; Hattori, T.; Saito, K.; Ishikawa, A.; Ohki, H.

    2014-01-01

    First spontaneous, noninvasive determination method of 10 B-BPA, 10 B-BPA–fructose complex, and total 10 B in blood is described. 10 B-NMR measurement with 100,000 FT accumulation enables us to obtain the result within 100 min/sample. The detection limits for the simultaneous analysis were 3 ppm, 3 ppm and 6 ppm for 10 B-BPA, 10 B-BPA–fructose complex and total 10 B respectively in this study. By this method, we can actually discuss behavior of the 10 B-BPA–fructose complex in blood. - Highlights: • First 10 B-NMR determination of 10 B-BPA and 10 B-BPA–fructose complex in blood. • Total 10 B concentration in blood could be obtained by this method • The detection limit was 3 ppm for total 10 B

  9. South Fork Snake River/Palisades Wildlife Mitigation Project: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan to compensate for losses of wildlife and wildlife habitat due to hydroelectric development at Palisades Dam. The Idaho Department of Fish and Game drafted the plan, which was completed in May 1993. This plan recommends land and conservation easement acquisition and wildlife habitat enhancement measures. These measures would be implemented on selected lands along the South Fork of the Snake River between Palisades Dam and the confluence with the Henry`s Fork, and on portions of the Henry`s Fork located in Bonneville, Madison, and Jefferson Counties, Idaho. BPA has prepared an Environmental Assessment evaluating the proposed project. The EA also incorporates by reference the analyses in the South Fork Snake River Activity/Operations Plan and EA prepared jointly in 1991 by the Bureau of Land Management and the Forest Service. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  10. Modification of Bisphenol-A Based Bismaleimide Resin (BPA-BMI) with an Allyl-Terminated Hyperbranched Polyimide (AT-PAEKI)

    National Research Council Canada - National Science Library

    Qin, Haihu; Mather, Patrick T; Baek, Jong-Beom; Tan, Loon-Seng

    2006-01-01

    ... bismaleimide resin (BPA-BMI). This was pursued in anticipation of improvements in processability as well as physical properties including glass transition temperature, elastic modulus, and fracture toughness...

  11. Augmented fish health monitoring

    International Nuclear Information System (INIS)

    Michak, P.; Rogers, R.; Amos, K.

    1991-05-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Historically, all agencies involved with fish health in the Columbia Basin were conducting various levels of fish health monitoring, pathogen screening and collection. The goals of this project were; to identify, develop and implement a standardized level of fish health methodologies, develop a common data collection and reporting format in the area of artificial production, evaluate and monitor water quality, improve communications between agencies and provide annual evaluation of fish health information for production of healthier smolts. This completion report will contain a project evaluation, review of the goals of the project, evaluation of the specific fish health analyses, an overview of highlights of the project and concluding remarks. 8 refs., 1 fig., 4 tabs

  12. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  13. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

    2012-05-31

    The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

  14. Lower Red River Meadow Stream Restoration Project

    International Nuclear Information System (INIS)

    1996-05-01

    As part of a continuing effort to restore anadromous fish populations in the South Fork Clearwater River basin of Idaho, Bonneville Power Administration (BPA) proposes to fund the Lower Red River Meadow Restoration Project (Project). The Project is a cooperative effort with the Idaho Soil and Water Conservation District, Nez Perce National Forest, Idaho Department of Fish and Game (IDFG), and the Nez Perce Tribe of Idaho. The proposed action would allow the sponsors to perform stream bank stabilization, aquatic and riparian habitat improvement activities on IDFG's Red River Management Area and to secure long-term conservation contracts or agreements for conducting streambank and habitat improvement activities with participating private landowners located in the Idaho County, Idaho, study area. This preliminary Environmental Assessment (EA) examines the potential environmental effects of stabilizing the stream channel, restoring juvenile fish rearing habitat and reestablishing a riparian shrub community along the stream

  15. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  16. Use of fluorine-18-BPA PET images and image registration to enhance radiation treatment planning for boron neutron capture therapy

    Science.gov (United States)

    Khan, Mohammad Khurram

    The Monte-Carlo based simulation environment for radiation therapy (SERA) software is used to simulate the dose administered to a patient undergoing boron neutron capture therapy (BNCT). Point sampling of tumor tissue results in an estimate of a uniform boron concentration scaling factor of 3.5. Under conventional treatment protocols, this factor is used to scale the boron component of the dose linearly and homogenously within the tumor and target volumes. The average dose to the tumor cells by such a method could be improved by better methods of quantifying the in-vivo 10B biodistribution. A better method includes radiolabeling para-Boronophenylalanine (p-BPA) with 18F and imaging the pharmaceutical using positron emission tomography (PET). This biodistribution of 18F-BPA can then be used to better predict the average dose delivered to the tumor regions. This work uses registered 18F-BPA PET images to incorporate the in-vivo boron biodistribution within current treatment planning. The registered 18F-BPA PET images are then coupled in a new computer software, PET2MRI.m, to linearly scale the boron component of the dose. A qualititative and quantitative assessment of the dose contours is presented using the two approaches. Tumor volume, tumor axial extent, and target locations are compared between using MRI or PET images to define the tumor volume. In addition, peak-to-normal brain value at tumor axial center is determined for pre and post surgery patients using 18F-BPA PET images. The differences noted between the registered GBM tumor volumes (range: 34.04--136.36%), tumor axial extent (range: 20--150%), and the beam target location (1.27--4.29 cm) are significantly different. The peak-to-normal brain values are also determined at the tumor axial center using the 18F-BPA PET images. The peak-to-normal brain values using the last frame of the pre-surgery study for the GBM patients ranged from 2.05--3.4. For post surgery time weighted PET data, the peak

  17. Dynamics of participation and supply of services in the Hood River Conservation Project

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; Goeltz, R.

    1986-07-01

    The Hood River Conservation Project (HRCP) is a major residential retrofit demonstration project. HRCP is funded by the Bonneville Power Administration (BPA) and run by Pacific Power and Light Company. The project was conducted in the community of Hood River, Oregon, will cost $21 million, and will last for three years (mid-1983 through 1986). Installation of applicable retrofit measures was completed by the end of 1985; data collection, analysis, and report writing will continue through 1986. This report documents the extent to which households participated in HRCP. Differences between participants and eligible nonparticipants are examined. Similarly, differences among participants as a function of when they signed up for HRCP are analyzed. The report also examines the dynamics of program services (i.e., times between audit requests and audit, and between audit and installation of measures). These analyses are based on data from the roughly 3500 Hood River homes eligible for HRCP, 3189 of which received free home energy audits and 2988 of which received HRCP-financed retrofit measures.

  18. Restoring Anadromous Fish Habitat in the Lapwai Creek Watershed, Technical Report 2003-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Lynn

    2007-02-01

    The Restoring Anadromous Fish Habitat in the Lapwai Creek Watershed is a multi-phase project to enhance steelhead trout in the Lapwai Creek watershed by improving salmonid spawning and rearing habitat. Habitat is limited by extreme high runoff events, low summer flows, high water temperatures, poor instream cover, spawning gravel siltation, and sediment, nutrient and bacteria loading. Funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council's Fish and Wildlife Program, the project assists in mitigating damage to steelhead runs caused by the Columbia River hydroelectric dams. The project is sponsored by the Nez Perce Soil and Water Conservation District (District). Target fish species include steelhead trout (Oncorhynchus mykiss). Steelhead trout within the Snake River Basin were listed in 1997 as threatened under the Endangered Species Act. Accomplishments for the contract period December 1, 2003 through February 28, 2004 include; seven grade stabilization structures, 0.67 acres of wetland plantings, ten acres tree planting, 500 linear feet streambank erosion control, two acres grass seeding, and 120 acres weed control.

  19. Disruption of the hypothalamic-pituitary-thyroid axis in zebrafish embryo–larvae following waterborne exposure to BDE-47, TBBPA and BPA

    International Nuclear Information System (INIS)

    Chan, Winson K.; Chan, King Ming

    2012-01-01

    We performed waterborne exposures of 2,2′,4,4′-tetrabromodiphenyl ether (BDE-47), tetrabromobisphenol A (TBBPA) or bisphenol A (BPA) on zebrafish (Danio rerio) embryo–larvae and quantitatively measured the expression of genes belonging to the hypothalamic-pituitary-thyroid (HPT) axis to assess for adverse thyroid function. For analysis on the effects of BDE-47, TBBPA and BPA on the hypothalamic-pituitary-thyroid genes, zebrafish embryo–larvae were acutely exposed to lethal concentrations of the chemical agents in order to determine the 96 h-LC50 (96 h lethal median concentration) and 96 h-EC50 (96 h effective median concentration) values. Further exposures at sub-lethal concentrations were then carried out and total RNA samples were extracted to quantify the mRNA expression levels of the genes of interest. In larvae, BDE-47 was found to have significantly induced many genes of interest, namely thyroglobulin, thyroid peroxidase, thyroid receptors α and β, thyroid stimulating hormone, and transthyretin. TBBPA only significantly induced three genes of interest (thyroid receptor α, thyroid stimulating hormone, and transthyretin) while BPA only induced thyroid stimulating hormone. In embryos, BDE-47 significantly induced the sodium iodide symporter and thyroid stimulating hormone. TBBPA significantly induced thyroid receptor α and thyroid stimulating hormone, while BPA did not significantly induce any of the genes. Most genes were only induced at the 75% 96 h-LC50 or 96 h-EC50 value; however, thyroid peroxidase and thyroid stimulating hormone demonstrated upregulation in a level as little as the 10% 96 h-LC50 value. The present study provides a new set of data on zebrafish mRNA induction of hypothalamic-pituitary-thyroid genes from exposure to BDE-47, TBBPA, or BPA. This information would serve useful for elucidating the toxicological mechanism of brominated flame retardants, assessing appropriate safety levels in the environment for these compounds, as well

  20. Disruption of the hypothalamic-pituitary-thyroid axis in zebrafish embryo-larvae following waterborne exposure to BDE-47, TBBPA and BPA

    Energy Technology Data Exchange (ETDEWEB)

    Chan, Winson K. [Biochemistry Program, School of Life Sciences, Chinese University of Hong Kong, Sha Tin, Hong Kong (Hong Kong); Chan, King Ming, E-mail: kingchan@cuhk.edu.hk [Biochemistry Program, School of Life Sciences, Chinese University of Hong Kong, Sha Tin, Hong Kong (Hong Kong); Environmental Science Program, School of Life Sciences, Chinese University of Hong Kong, Sha Tin, Hong Kong (Hong Kong)

    2012-02-15

    We performed waterborne exposures of 2,2 Prime ,4,4 Prime -tetrabromodiphenyl ether (BDE-47), tetrabromobisphenol A (TBBPA) or bisphenol A (BPA) on zebrafish (Danio rerio) embryo-larvae and quantitatively measured the expression of genes belonging to the hypothalamic-pituitary-thyroid (HPT) axis to assess for adverse thyroid function. For analysis on the effects of BDE-47, TBBPA and BPA on the hypothalamic-pituitary-thyroid genes, zebrafish embryo-larvae were acutely exposed to lethal concentrations of the chemical agents in order to determine the 96 h-LC50 (96 h lethal median concentration) and 96 h-EC50 (96 h effective median concentration) values. Further exposures at sub-lethal concentrations were then carried out and total RNA samples were extracted to quantify the mRNA expression levels of the genes of interest. In larvae, BDE-47 was found to have significantly induced many genes of interest, namely thyroglobulin, thyroid peroxidase, thyroid receptors {alpha} and {beta}, thyroid stimulating hormone, and transthyretin. TBBPA only significantly induced three genes of interest (thyroid receptor {alpha}, thyroid stimulating hormone, and transthyretin) while BPA only induced thyroid stimulating hormone. In embryos, BDE-47 significantly induced the sodium iodide symporter and thyroid stimulating hormone. TBBPA significantly induced thyroid receptor {alpha} and thyroid stimulating hormone, while BPA did not significantly induce any of the genes. Most genes were only induced at the 75% 96 h-LC50 or 96 h-EC50 value; however, thyroid peroxidase and thyroid stimulating hormone demonstrated upregulation in a level as little as the 10% 96 h-LC50 value. The present study provides a new set of data on zebrafish mRNA induction of hypothalamic-pituitary-thyroid genes from exposure to BDE-47, TBBPA, or BPA. This information would serve useful for elucidating the toxicological mechanism of brominated flame retardants, assessing appropriate safety levels in the environment for

  1. Evaluation of the toxic effects of brominated compounds (BDE-47, 99, 209, TBBPA) and bisphenol A (BPA) using a zebrafish liver cell line, ZFL

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jie; Chan, King Ming, E-mail: kingchan@cuhk.edu.hk

    2015-02-15

    Highlights: • A homologous zebrafish thyroid hormone (TH) receptor (TR) reporter gene system was developed in a zebrafish liver cell-line (ZFL) to study the possible effects of chemicals on TR activities. • BPA was found to have antagonistic effects on T3 induced TR activity, BDE-47, BDE-99, and TBBPA did not show any interference of TR activity. • Down regulation of deiodinases and some sulfation enzymes or phase II enzymes by the tested chemicals indicated their impacts on TH eleiminations. • The up-regulation of tranthyretin by BDE-47 at 96 h long-term exposure gave a link to the CYP family for its role in producing a more toxic and oxidized form. - Abstract: The toxic effects of three polybrominated diphenyl ether (PBDE) congeners (BDE-47, -99, and -209), tetrabromobisphenol A (TBBPA) and bisphenol A (BPA), were evaluated by determining their 24 h and 96 h median lethal concentrations using a zebrafish liver cell line, ZFL. It was found that BDE-47, BDE-99 and TBBPA showed comparative cytotoxicity within the range of 1.2–4.2 μM, and were more toxic than BPA (367.1 μM at 24 h and 357.6 μM at 96 h). However, BDE-209 induced only 15% lethality with exposures up to 25 μM. The molecular stresses of BDE-47, -99, TBBPA and BPA involved in thyroid hormone (TH) homeostasis and hepatic metabolism were also investigated. Using a reporter gene system to detect zebrafish thyroid hormone receptor β (zfTRβ) transcriptional activity, the median effective concentration of triiodothyronine (T3) was determined to be 9.2 × 10{sup −11} M. BDE-47, BDE-99, TBBPA and BPA alone, however, did not exhibit zfTRβ agonistic activity. BPA displayed T3 (0.1 nM) induced zfTRβ antagonistic activity with a median inhibitory concentration of 19.3 μM. BDE-47, BDE-99 and TBBPA displayed no antagonistic effects of T3-induced zfTRβ activity. Target gene expressions were also examined under acute exposures. The significant inhibition of different types of deiodinases by all of

  2. Biotransformation of glyceryl trinitrate (GTN) in isolated bovine pulmonary artery (BPA) and bovine pulmonary vein (BPV)

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    A proposed mechanism of GTN-induced vasodilation requires biotransformation of GTN to glyceryl dinitrate (GDN). They have previously shown that GTN is metabolized to GDN during relaxation of isolated rabbit aorta. The authors have extended this study to include BPA and BPV and to determine if their sensitivity to GTN correlates with their ability to metabolize GTN. Strips of BPA and BPV were contracted submaximally with KCl and then incubated with 0.5 μM 14 C-GTN for 2 min. GTN-induced relaxation of these vessels was monitored and tissue GTN and metabolite concentrations were measured. Data are presented which support the above hypothesis that GTN biotransformation and relaxation occur together in vascular smooth muscle; however, there appear to be factors other than extent of GTN biotransformation that account for the difference in sensitivity to GTN of the artery and vein

  3. Idaho Habitat/Natural Production Monitoring, Pt. I: General Monitoring Subproject : Annual Progress Report 1990.

    Energy Technology Data Exchange (ETDEWEB)

    Rich, Bruce A.; Scully, Richard J.; Petrosky, Charles Edward

    1992-01-01

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss, hereafter called steelhead, and chinook salmon O. tshawytscha, hereafter called chinook, in the Clearwater and Salmon River drainages for the past seven years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. This evaluation project is also funded under the same authority (Fish and Wildlife Program, Northwest Power Planning Council). A mitigation record is being developed using increased carrying capacity and/or survival as the best measure of benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.

  4. 1H MRS of a boron neutron capture therapy 10B-carrier, L-p-boronophenylalanine-fructose complex, BPA-F: phantom studies at 1.5 and 3.0 T

    International Nuclear Information System (INIS)

    Heikkinen, S; Kangasmaeki, A; Timonen, M; Kankaanranta, L; Haekkinen, A-M; Lundbom, N; Vaehaetalo, J; Savolainen, S

    2003-01-01

    The quantification of a BNCT 10 B-carrier, L-p-boronophenylalanine-fructose complex (BPA-F), was evaluated using 1 H magnetic resonance spectroscopy ( 1 H MRS) with phantoms at 1.5 and 3.0 T. For proper quantification, relaxation times T 1 and T 2 are needed. While T 1 is relatively easy to determine, the determination of T 2 of a coupled spin system of aromatic protons of BPA is not straightforward with standard MRS sequences. In addition, an uncoupled concentration reference for aromatic protons of BPA must be used with caution. In order to determine T 2 , the response of an aromatic proton spin system to the MRS sequence PRESS with various echo times was calculated and the product of the response curve with exponential decay was fitted to the measured intensities. Furthermore, the response curve can be used to correct the intensities, when an uncoupled resonance is used as a concentration reference. BPA was quantified using both phantom replacement and internal water referencing methods with accuracies of ±5% and ±15%. Our phantom results suggest that in vivo studies on BPA concentration determination will be feasible

  5. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  6. Sharp-tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project

    International Nuclear Information System (INIS)

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation

  7. Columbia Estuary Ecosystem Restoration Program: Restoration Design Challenges for Topographic Mounds, Channel Outlets, and Reed Canarygrass

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Borde, Amy B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sinks, Ian A. [Columbia Land Trust, Vancouver, WA (United States); Cullinan, Valerie I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-31

    The purpose of this study was to provide science-based information to practitioners and managers of restoration projects in the Columbia Estuary Ecosystem Restoration Program (CEERP) regarding aspects of restoration techniques that currently pose known challenges and uncertainties. The CEERP is a program of the Bonneville Power Administration (BPA) and the U.S. Army Corps of Engineers (Corps), Portland District, in collaboration with the National Marine Fisheries Service and five estuary sponsors implementing restoration. The estuary sponsors are Columbia Land Trust, Columbia River Estuary Study Taskforce, Cowlitz Tribe, Lower Columbia Estuary Partnership, and Washington Department of Fish and Wildlife. The scope of the research conducted during federal fiscal year 2015 included three aspects of hydrologic reconnection that were selected based on available scientific information and feedback from restoration practitioners during project reviews: the design of mounds (also called hummocks, peninsulas, or berms); the control of reed canarygrass (Phalaris arundinaceae); and aspects of channel network design related to habitat connectivity for juvenile salmonids.

  8. Household energy conservation attitudes and behaviors in the Northwest: Tracking changes between 1983 and 1985

    Energy Technology Data Exchange (ETDEWEB)

    Fang, J.M.; Hattrup, M.P.; Nordi, R.T.; Shankle, S.A.; Ivey, D.L.

    1987-05-01

    Pacific Northwest Laboratory (PNL) has analyzed the changes in consumer energy conservation attitudes and behaviors in the Pacific Northwest between 1983 and 1985. The information was collected through stratified random telephone surveys on 2000 and 1058 households, respectively, for 1983 and 1985 in the Bonneville Power Administration (BPA) service area in Idaho, Oregon, Washington and Western Montana. This report covers four topic areas and tests two hypotheses. The topics are as follows: consumer perceptions and attitudes of energy use and conservation in the home; consumer perceptions of energy institutions and other entities; past and intended conservation actions and investments; and segmentation of homeowners into market prospect groups. The hypotheses tested are as follows: (1) There has been no change in the size and psychographic make-up of the original three market segments found in the 1983 survey analysis; and (2) image profiles of institutions with respect to familiarity, overall impression, and believability as sources of energy conservation information remain unchanged since 1983.

  9. Habitat Evaluation Procedures Report; Carl Property - Yakama Nation.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul; Muse, Anthony

    2008-02-01

    A baseline habitat evaluation procedures (HEP) analysis was conducted on the Carl property (160 acres) in June 2007 to determine the number of habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the property as partial mitigation for habitat losses associated with construction of McNary Dam. HEP surveys also helped assess the general ecological condition of the property. The Carl property appeared damaged from livestock grazing and exhibited a high percentage of invasive forbs. Exotic grasses, while present, did not comprise a large percentage of the available cover in most areas. Cover types were primarily grassland/shrubsteppe with a limited emergent vegetation component. Baseline HEP surveys generated 356.11 HUs or 2.2 HUs per acre. Habitat units were associated with the following HEP models: California quail (47.69 HUs), western meadowlark (114.78 HUs), mallard (131.93 HUs), Canada goose (60.34 HUs), and mink (1.38 HUs).

  10. Comparative study of two boron compounds (BPA and BOPP) for the application of BNCT to an animal model of undifferentiated thyroid cancer

    International Nuclear Information System (INIS)

    Dagrosa, Maria A.; Viaggi, Mabel; Juvenal, Guillermo; Pisarev, Mario A.

    2003-01-01

    Boron neutron capture therapy (BNCT) is based on the selective uptake of certain boron compounds by tumors. Once the uptake, relative to normal tissues, is equal of greater than 3, the tumoral area is irradiated with an appropriate neutron beam. The 10 B is then converted into 11 B and this decays releasing an atom of Li, gamma rays and alpha particles. These latter have a high linear energy transfer (LET) and will cause local damage, eventually killing the tumoral cells. At the present time several clinical trials are being conducted in different countries to treat patients with glioblastoma multiform and melanomas. So far the results obtained, specially with this last disease, are quite encouraging. Undifferentiated thyroid cancer (UTC) is a very aggressive tumor which does not respond to the therapies available at the present. Usually it has a very bad prognosis with a very short survival period. We have previously shown that the human UTC cell line ARO has an uptake of borophenylanine (BPA) significantly greater than normal thyroid or than human follicular adenoma cells in culture. Moreover, an animal model for UTC was developed in our laboratory by transplanting the human ARO cells into nude mice. This model closely resembles the evolution of human disease and even produces lung metastasis, like the human. In the present studies we have compared the uptake of two boron compounds: BPA and boronated porphyrin (BOPP). BPA was administered via ip in a dose of 600 mg/kg body weight, while BOPP was given either ip or iv, in doses of 10 and 100 mg/kg body weight. The animals were sacrificed at different times after the injection: up to 150 min for BPA and after 24 h with BOPP. The concentration of boron was determined by ICP-AES. The results obtained showed that the uptake of BPA was significantly greater in the tumoral area and in the infiltrated surrounding skin than in the other organs examined (liver, kidney, lung, mice thyroid, blood, spleen and distal skin

  11. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam Report C, Annual Progress Report April 2003 - March 2004

    Science.gov (United States)

    Parsley, Michael J.; Gadomski, Dena M.; Kofoot, Pete

    2005-01-01

    River discharge and water temperatures that occurred during April through July 2003 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Although optimal spawning temperatures in the four tailraces occurred for less than two weeks, they coincided with a period of relatively high river discharge. Bottom-trawl sampling in Bonneville and The Dalles Reservoirs revealed the presence of young-of-the-year (YOY) white sturgeon in Bonneville Reservoir, but none were captured in The Dalles Reservoir. A comparison of five years of indices of abundance of YOY sturgeon from sampling done by ODFW with gillnets and the USGS with bottom trawls was completed. Despite obvious differences in gear sampling characteristics (e.g. one gear is actively fished, one passively fished), it appears that either gear can be used to assess relative trends in YOY white sturgeon abundance. The analyses suffered due to poor catches of YOY fish, as YOY were only captured in The Dalles Reservoir during three of the five years of comparison sampling, and during only one of four years in John Day Reservoir. However, both gears detected the presence or absence of YOY white sturgeon within a reservoir equally. That is, if any YOY white sturgeon were captured in any year in a reservoir, both gears captured at least one fish, and if one gear failed to collect any YOY white sturgeon, both gears failed. Concerns have been raised that the Wang et al. (1985) egg development relationships for Sacramento River white sturgeon may not be applicable to Columbia Basin stocks. However, using laboratory experiments with white sturgeon eggs incubated at 10, 12, 15, and 18o C, we found no significant differences in development rates of eggs of Columbia, Kootenai, Snake, and Sacramento river fish.

  12. Is container type the biggest predictor of trace element and BPA leaching from drinking water bottles?

    Science.gov (United States)

    Rowell, Candace; Kuiper, Nora; Preud'Homme, Hugues

    2016-07-01

    The knowledge-base of bottled water leachate is highly contradictory due to varying methodologies and limited multi-elemental and/or molecular analyses; understanding the range of contaminants and their pathways is required. This study determined the leaching potential and leaching kinetics of trace elements, using consistent comprehensive quantitative and semi-quantitative (79 elements total) analyses, and BPA, using isotopic dilution and MEPS pre-concentration with UHPLC-ESI-QTOF. Statistical methods were used to determine confounders and predictors of leaching and human health risk throughout 12days of UV exposure and after exposure to elevated temperature. Various types of water were used to assess the impact of water quality. Results suggest Sb leaching is primarily dependent upon water quality, not container type. Bottle type is a predictor of elemental leaching for Pb, Ba, Cr, Cu, Mn and Sr; BPA was detected in samples from polycarbonate containers. Health risks from the consumption of bottled water increase after UV exposure. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Variability in large-scale wind power generation: Variability in large-scale wind power generation

    Energy Technology Data Exchange (ETDEWEB)

    Kiviluoma, Juha [VTT Technical Research Centre of Finland, Espoo Finland; Holttinen, Hannele [VTT Technical Research Centre of Finland, Espoo Finland; Weir, David [Energy Department, Norwegian Water Resources and Energy Directorate, Oslo Norway; Scharff, Richard [KTH Royal Institute of Technology, Electric Power Systems, Stockholm Sweden; Söder, Lennart [Royal Institute of Technology, Electric Power Systems, Stockholm Sweden; Menemenlis, Nickie [Institut de recherche Hydro-Québec, Montreal Canada; Cutululis, Nicolaos A. [DTU, Wind Energy, Roskilde Denmark; Danti Lopez, Irene [Electricity Research Centre, University College Dublin, Dublin Ireland; Lannoye, Eamonn [Electric Power Research Institute, Palo Alto California USA; Estanqueiro, Ana [LNEG, Laboratorio Nacional de Energia e Geologia, UESEO, Lisbon Spain; Gomez-Lazaro, Emilio [Renewable Energy Research Institute and DIEEAC/EDII-AB, Castilla-La Mancha University, Albacete Spain; Zhang, Qin [State Grid Corporation of China, Beijing China; Bai, Jianhua [State Grid Energy Research Institute Beijing, Beijing China; Wan, Yih-Huei [National Renewable Energy Laboratory, Transmission and Grid Integration Group, Golden Colorado USA; Milligan, Michael [National Renewable Energy Laboratory, Transmission and Grid Integration Group, Golden Colorado USA

    2015-10-25

    The paper demonstrates the characteristics of wind power variability and net load variability in multiple power systems based on real data from multiple years. Demonstrated characteristics include probability distribution for different ramp durations, seasonal and diurnal variability and low net load events. The comparison shows regions with low variability (Sweden, Spain and Germany), medium variability (Portugal, Ireland, Finland and Denmark) and regions with higher variability (Quebec, Bonneville Power Administration and Electric Reliability Council of Texas in North America; Gansu, Jilin and Liaoning in China; and Norway and offshore wind power in Denmark). For regions with low variability, the maximum 1 h wind ramps are below 10% of nominal capacity, and for regions with high variability, they may be close to 30%. Wind power variability is mainly explained by the extent of geographical spread, but also higher capacity factor causes higher variability. It was also shown how wind power ramps are autocorrelated and dependent on the operating output level. When wind power was concentrated in smaller area, there were outliers with high changes in wind output, which were not present in large areas with well-dispersed wind power.

  14. Early phase II study on BNCT in metastatic malignant melanoma using the boron carrier BPA (EORTC protocol 11011)

    International Nuclear Information System (INIS)

    Wittig, Andrea; Sauerwein, Wolfgang; Moss, Raymond

    2006-01-01

    The aim of the trial is to examine the clinical response of metastatic melanoma following BNCT with BPA. The trial contains an optional biodistribution sub-study, which is done if operable metastases are removed prior BNCT. BNCT is applied in 2 fractions at the HFR in Petten. In cases of diffuse brain metastases the whole brain is irradiated homogeneously using 5 irradiation beams from different directions. Up to now 4 patients suffering from multiple brain metastases (more than 20) have been included. In all cases we observed a partial response or no change in the irradiated volume. However, none of the patients survived more than 3 months. The pharmacokinetic of the BPA can be predicted very precisely using a two-compartment model. The treatment can be performed safety. (author)

  15. Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1; FINAL

    International Nuclear Information System (INIS)

    Carlson, Thomas J

    2001-01-01

    This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories

  16. Kootenai River Focus Watershed Coordination, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Munson, Bob; Munson, Vicki (Kootenai River Network, Libby, MT); Rogers, Rox (US Fish and Wildlife Service, Libby, MT)

    2003-10-01

    The Kootenai River Network Inc. (KRN) was incorporated in Montana in early 1995 with a mission ''to involve stakeholders in the protection and restoration of the chemical, physical and biological integrity of the Kootenai River Basin waters''. The KRN operates with funding from donations, membership dues, private, state and federal grants, and with funding through the Bonneville Power Administration (BPA) for a Focus Watershed Coordinator Program. The Focus Watershed Program is administered to KRN as of October 2001, through a Memorandum of Understanding. Katie Randall resigned her position as Watershed Coordinator in late January 2003 and Munson Consulting was contracted to fill that position through the BPA contract period ending May 30, 2003. To improve communications with in the Kootenai River watershed, the board and staff engaged watershed stakeholders in a full day KRN watershed conference on May 15 and 16 in Bonners Ferry, Idaho. This Annual General Meeting was a tremendous success with over 75 participants representing over 40 citizen groups, tribes and state/provincial/federal agencies from throughout northern Montana and Idaho as well as British Columbia and Alberta. Membership in the KRN increased during the course of the BPA 02/03 grant period. The board of directors grew in numbers during this same time frame and an Advisory Council was formed to assist in transboundary efforts while developing two reorganized KRN committees (Habitat/Restoration/Monitoring (HRM) and Communication/Education/Outreach (CEO)). These committees will serve pivotal roles in communications, outreach, and education about watershed issues, as well as habitat restoration work being accomplished throughout the entire watershed. During this BPA grant period, the KRN has capitalized on the transboundary interest in the Kootenai River watershed. Jim and Laura Duncan of Kimberley, British Columbia, have been instrumental volunteers who have acted as Canadian

  17. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batten, G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  18. A Road Map for Success: How Northwest Manufactured Housing Conservation Efforts Revolutionized an Industry.

    Energy Technology Data Exchange (ETDEWEB)

    Gilbertson, William L.

    1993-04-01

    The evolution of an ongoing Bonneville Power Administration effort to improve the energy efficiency of manufactured homes is chronicled in this informal history. Over the past nine years, Bonneville`s manufactured housing project has undertaken many activities, including technical studies, cooperative ventures, design studies, and information dissemination. These activities are covered.

  19. Enhanced uptake of BPA in the presence of nanoplastics can lead to neurotoxic effects in adult zebrafish

    NARCIS (Netherlands)

    Chen, Qiqing; Yin, Daqiang; Jia, Yunlu; Schiwy, Sabrina; Legradi, Jessica; Yang, Shouye; Hollert, Henner

    2017-01-01

    Plastic particles have been proven to be abundant in the aquatic environment, raising concerns about their potential toxic effects. In the present study, we determined the bioaccumulation potential of bisphenol A (BPA) in adult zebrafish (Danio rerio) in the absence and presence of nano-sized

  20. Evaluation of BPA uptake in clear cell sarcoma (CCS) in vitro and development of an in vivo model of CCS for BNCT studies.

    Science.gov (United States)

    Fujimoto, T; Andoh, T; Sudo, T; Fujita, I; Imabori, M; Moritake, H; Sugimoto, T; Sakuma, Y; Takeuchi, T; Sonobe, H; Epstein, Alan L; Akisue, T; Kirihata, M; Kurosaka, M; Fukumori, Y; Ichikawa, H

    2011-12-01

    Clear cell sarcoma (CCS), a rare malignant tumor with a predilection for young adults, is of poor prognosis. Recently however, boron neutron capture therapy (BNCT) with the use of p-borono-L-phenylalanine (BPA) for malignant melanoma has provided good results. CCS also produces melanin; therefore, the uptake of BPA is the key to the application of BNCT to CCS. We describe, for the first time, the high accumulation of boron in CCS and the CCS tumor-bearing animal model generated for BNCT studies. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. 48 CFR 339.7001 - Request for approval to make an award to other than a GSA BPA holder.

    Science.gov (United States)

    2010-10-01

    ... Use of General Services Administration Blanket Purchase Agreements for Independent Risk Analysis... micro-purchase threshold, that obtaining the required services from a source other than a GSA BPA holder... include additional supporting rationale to document the best value decision, as appropriate. ...

  2. Artificial neural networks to evaluate the boron concentration decreasing profile in Blood-BPA samples of BNCT patients

    Energy Technology Data Exchange (ETDEWEB)

    Garcia-Reiriz, Alejandro, E-mail: garciareiriz@gmail.com [Department of Analytical Chemistry, Faculty of Biochemical and Pharmaceutical Sciences, National University of Rosario, Rosario Institute of Chemistry (IQUIR-CONICET), Suipacha 531, Rosario S2002LRK (Argentina); Magallanes, Jorge [Comision Nacional de Energia Atomica, Av. Gral. Paz 1499, San Martin, B1650KNA, Buenos Aires (Argentina); Zupan, Jure [National Institute of Chemistry, Hajdrihova 19, SLO-1000 Ljubljana, Eslovenia (Slovenia); Liberman, Sara [Comision Nacional de Energia Atomica, Av. Gral. Paz 1499, San Martin, B1650KNA, Buenos Aires (Argentina)

    2011-12-15

    For the prediction of decay concentration profiles of the p-boronophenylalanine (BPA) in blood during BNCT treatment, a method is suggested based on Kohonen neural networks. The results of a model trained with the concentration profiles from the literature are described. The prediction of the model was validated by the leave-one-out method. Its robustness shows that it is mostly independent on small variations. The ability to fit retrospective experimental data shows an uncertainty lower than the two compartment model used previously. - Highlights: Black-Right-Pointing-Pointer We predicted decaying concentration profiles of BPA in blood during BNCT therapy. Black-Right-Pointing-Pointer Is suggested a method based on Kohonen neural networks. Black-Right-Pointing-Pointer The results show that it is very robust and mostly independent of small variations. Black-Right-Pointing-Pointer It has a better ability to fit retrospective experimental data. Black-Right-Pointing-Pointer The model could be progressively improved by adding new data to the training matrix.

  3. Artificial neural networks to evaluate the boron concentration decreasing profile in Blood-BPA samples of BNCT patients

    International Nuclear Information System (INIS)

    García-Reiriz, Alejandro; Magallanes, Jorge; Zupan, Jure; Líberman, Sara

    2011-01-01

    For the prediction of decay concentration profiles of the p-boronophenylalanine (BPA) in blood during BNCT treatment, a method is suggested based on Kohonen neural networks. The results of a model trained with the concentration profiles from the literature are described. The prediction of the model was validated by the leave-one-out method. Its robustness shows that it is mostly independent on small variations. The ability to fit retrospective experimental data shows an uncertainty lower than the two compartment model used previously. - Highlights: ► We predicted decaying concentration profiles of BPA in blood during BNCT therapy. ► Is suggested a method based on Kohonen neural networks. ► The results show that it is very robust and mostly independent of small variations. ► It has a better ability to fit retrospective experimental data. ► The model could be progressively improved by adding new data to the training matrix.

  4. Wigwam River juvenile bull trout and fish habitat monitoring program: 2000 data report; TOPICAL

    International Nuclear Information System (INIS)

    Cope, R.S.; Morris, K.J.

    2001-01-01

    The Wigwam River bull trout (Salvelinus confluentus) and fish habitat monitoring program is a trans-boundary initiative implemented by the British Columbia Ministry of Environment, Lands and Parks (MOE), in cooperation with Bonneville Power Administration (BPA). The Wigwam River is an important fisheries stream located in southeastern British Columbia that supports healthy populations of both bull trout and Westslope cutthroat trout (Figure 1.1). This river has been characterized as the single most important bull trout spawning stream in the Kootenay Region (Baxter and Westover 2000, Cope 1998). In addition, the Wigwam River supports some of the largest Westslope cutthroat trout (Oncorhynchus clarki lewisi) in the Kootenay Region. These fish are highly sought after by anglers (Westover 1999a, 1999b). Bull trout populations have declined in many areas of their range within Montana and throughout the northwest including British Columbia. Bull trout were blue listed as vulnerable in British Columbia by the B.C. Conservation Data Center (Cannings 1993) and although there are many healthy populations of bull trout in the East Kootenays they remain a species of special concern. Bull trout in the United States portion of the Columbia River were listed as threatened in 1998 under the Endangered Species Act by the U.S. Fish and Wildlife Service. The upper Kootenay River is within the Kootenai sub-basin of the Mountain Columbia Province, one of the eleven Eco-provinces that make up the Columbia River Basin. MOE applied for and received funding from BPA to assess and monitor the status of wild, native stocks of bull trout in tributaries to Lake Koocanusa (Libby Reservoir) and the upper Kootenay River. This task is one of many that was undertaken to ''Monitor and Protect Bull Trout for Koocanusa Reservoir'' (BPA Project Number 2000-04-00)

  5. Wigwam River Juvenile Bull Trout and Fish Habitat Monitoring Program : 2002 Data Report.

    Energy Technology Data Exchange (ETDEWEB)

    Cope, R.S. [Westslope Fisheries, Cranbrook, BC, Canada

    2003-03-01

    The Wigwam River bull trout (Salvelinus confluentus) and fish habitat monitoring program is a trans-boundary initiative implemented by the British Columbia Ministry of Water, Land, and Air Protection (MWLAP), in cooperation with Bonneville Power Administration (BPA). The Wigwam River is an important fisheries stream located in southeastern British Columbia that supports healthy populations of both bull trout and Westslope cutthroat trout (Figure 1). This river has been characterized as the single most important bull trout spawning stream in the Kootenay Region (Baxter and Westover 2000, Cope 1998). In addition, the Wigwam River supports some of the largest Westslope cutthroat trout (Oncorhynchus clarki lewisi) in the Kootenay Region. These fish are highly sought after by anglers (Westover 1999a, 1999b). Bull trout populations have declined in many areas of their range within Montana and throughout the northwest including British Columbia. Bull trout were blue listed as vulnerable in British Columbia by the B.C. Conservation Data Center (Cannings 1993) and although there are many healthy populations of bull trout in the East Kootenay they remain a species of special concern. Bull trout in the United States portion of the Columbia River were listed as threatened in 1998 under the Endangered Species Act by the U.S. Fish and Wildlife Service. The upper Kootenay River is within the Kootenai sub-basin of the Mountain Columbia Province, one of the eleven Eco-provinces that make up the Columbia River Basin. MWLAP applied for and received funding from BPA to assess and monitor the status of wild, native stocks of bull trout in tributaries to Lake Koocanusa (Libby Reservoir) and the upper Kootenay River. This task is one of many that were undertaken to ''Monitor and Protect Bull Trout for Koocanusa Reservoir'' (BPA Project Number 2000-04-00).

  6. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  7. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  8. Experimental Studies of Boronophenylalanine ({sup 10}BPA) Biodistribution for the Individual Application of Boron Neutron Capture Therapy (BNCT) for Malignant Melanoma Treatment

    Energy Technology Data Exchange (ETDEWEB)

    Carpano, Marina; Perona, Marina; Rodriguez, Carla [Department of Radiobiology, National Atomic Energy Commission, San Martín (Argentina); Nievas, Susana; Olivera, Maria; Santa Cruz, Gustavo A. [Department of Boron Neutron Capture Therapy, National Atomic Energy Commission, San Martín (Argentina); Brandizzi, Daniel; Cabrini, Romulo [Department of Radiobiology, National Atomic Energy Commission, San Martín (Argentina); School of Dentistry, University of Buenos Aires, Buenos Aires (Argentina); Pisarev, Mario [Department of Radiobiology, National Atomic Energy Commission, San Martín (Argentina); National Research Council of Argentina, Buenos Aires (Argentina); Department of Human Biochemistry, School of Medicine, University of Buenos Aires, Buenos Aires (Argentina); Juvenal, Guillermo Juan [Department of Radiobiology, National Atomic Energy Commission, San Martín (Argentina); National Research Council of Argentina, Buenos Aires (Argentina); Dagrosa, Maria Alejandra, E-mail: dagrosa@cnea.gov.ar [Department of Radiobiology, National Atomic Energy Commission, San Martín (Argentina); National Research Council of Argentina, Buenos Aires (Argentina)

    2015-10-01

    Purpose: Patients with the same histopathologic diagnosis of cutaneous melanoma treated with identical protocols of boron neutron capture therapy (BNCT) have shown different clinical outcomes. The objective of the present studies was to evaluate the biodistribution of boronophenilalanina ({sup 10}BPA) for the potential application of BNCT for the treatment of melanoma on an individual basis. Methods and Materials: The boronophenilalanine (BPA) uptake was evaluated in 3 human melanoma cell lines: MEL-J, A375, and M8. NIH nude mice were implanted with 4 10{sup 6} MEL-J cells, and biodistribution studies of BPA (350 mg/kg intraperitoneally) were performed. Static infrared imaging using a specially modified infrared camera adapted to measure the body infrared radiance of small animals was used. Proliferation marker, Ki-67, and endothelial marker, CD31, were analyzed in tumor samples. Results: The in vitro studies demonstrated different patterns of BPA uptake for each analyzed cell line (P<.001 for MEL-J and A375 vs M8 cells). The in vivo studies showed a maximum average boron concentration of 25.9 ± 2.6 μg/g in tumor, with individual values ranging between 11.7 and 52.0 μg/g of {sup 10}B 2 hours after the injection of BPA. Tumor temperature always decreased as the tumors increased in size, with values ranging between 37°C and 23°C. A significant correlation between tumor temperature and tumor-to-blood boron concentration ratio was found (R{sup 2} = 0.7, rational function fit). The immunohistochemical studies revealed, in tumors with extensive areas of viability, a high number of positive cells for Ki-67, blood vessels of large diameter evidenced by the marker CD31, and a direct logistic correlation between proliferative status and boron concentration difference between tumor and blood (R{sup 2} = 0.81, logistic function fit). Conclusion: We propose that these methods could be suitable for designing new screening protocols applied before melanoma BNCT

  9. Modeling and optimization of tissue 10B concentration and dosimetry for arbitrary BPA-F infusion schedules in humans

    International Nuclear Information System (INIS)

    Kiger, W.S. III; Newton, T.H.; Palmer, M.R.

    2000-01-01

    Separate compartmental models have been derived for the concentration of 10 B resulting from BPA-F infusion in the central vascular space (i.e., blood or, more appropriately, plasma) and in glioblastoma multiforme and normal brain. By coupling the model for the temporal variation of 10 B concentration in the central vascular space with that for tissue, the dynamic behavior of the 10 B concentration and the resulting dosimetry in the relevant tissues and blood may be predicted for arbitrary infusion schedules. This coupled model may be used as a tool for identifying the optimal time for BNCT irradiation and optimal BPA-F infusion schedule (i.e., temporal targeting) in humans without the need for expensive and time-consuming pharmacokinetic studies for every infusion schedule considered. This model was used to analyze the concentration profiles resulting from a wide range of infusion schedules and their implications for dosimetry. (author)

  10. Observing System Simulation Experiments (OSSEs) for the Mid-Columbia Basin

    Energy Technology Data Exchange (ETDEWEB)

    Zack, J; Natenberg, E J; Knowe, G V; Waight, K; Manobianco, J; Hanley, D; Kamath, C

    2011-09-13

    The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height ({approx}80 m). In this phase of the project the focus is on the Mid-Columbia Basin region, which encompasses the Bonneville Power Administration (BPA) wind generation area (Figure 1) that includes the Klondike, Stateline, and Hopkins Ridge wind plants. There are two tasks in the current project effort designed to validate the Ensemble Sensitivity Analysis (ESA) observational system deployment approach in order to move closer to the overall goal: (1) Perform an Observing System Experiment (OSE) using a data denial approach. The results of this task are presented in a separate report. (2) Conduct a set of Observing System Simulation Experiments (OSSE) for the Mid-Colombia basin region. This report presents the results of the OSSE task. The specific objective is to test strategies for future deployment of observing systems in order to suggest the best and most efficient ways to improve wind forecasting at BPA wind farm locations. OSSEs have been used for many years in meteorology to evaluate the potential impact of proposed observing systems, determine tradeoffs in instrument design, and study the most effective data assimilation methodologies to incorporate the new observations into numerical weather prediction (NWP) models (Atlas 1997; Lord 1997). For this project, a series of OSSEs will allow consideration of the impact of new observing systems of various types and in various locations.

  11. Idaho Habitat Evaluation for Off-Site Mitigation Record : Annual Report 1987.

    Energy Technology Data Exchange (ETDEWEB)

    Petrosky, Charles E.; Holubetz, Terry B. (Idaho Dept. of Fish and Game, Boise, ID (USA)

    1988-04-01

    The Idaho Department of Fish and Game has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead (Salmo gairdneri) and chinook salmon (Oncorhynchus tshawytscha) in the Clearwater and Salmon River drainages over the last four years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed to use increased smolt production at full seeding as the best measure of benefit from a habitat enhancement project. Determination of full benefit from a project depends on presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded attainment of full benefit of any habitat project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration. According to the BPA Work Plan, project implementors have the primary responsibility for measuring physical habitat and estimating habitat change. To date, Idaho habitat projects have been implemented primarily by the US Forest Service (USFS). The Shoshone-Bannock Tribes (SBT) have sponsored three projects (Bear Valley Mine, Yankee Fork, and the proposed East Fork Salmon River projects). IDFG implemented two barrier-removal projects (Johnson Creek and Boulder Creek) that the USFS was unable to sponsor at that time. The role of IDFG in physical habitat monitoring is primarily to link habitat quality and habitat change to changes in actual, or potential, fish production. Individual papers were processed separately for the data base.

  12. The results of a non-linear mathematical model for the kinetics of 10B after BPA-F infusion in BNCT

    International Nuclear Information System (INIS)

    Ryynaenen, P.; Savolainen, S.; Hiismaeki, P.; Kangasmaeki, A.

    2001-01-01

    The aim of this study was to create a model for the kinetics of 10 B in glioma patients after p-boronophenylalanine fructose complex (BPA-F) infusion in order to predict the 10 B concentration in blood during the neutron irradiations in BNCT. The more specific aim was to create a flexible model that would work with variable infusion duration and variable amounts of infused BRA, by forehand carrying out only 1 to 2 kinetic studies per different trials. Previously used bi-exponential fitting and open compartmental model are capable, but, however, heavy kinetic studies are needed before they are reliable enough. A model probe with a memory effect based on phenomenological findings was created. The model development was based on the data from 10 glioblastoma multiforme patients from the Brookhaven National Laboratory BNCT trials. These patients received i.v. 290 mg BPA/kg body weight as a fructose complex during two hours. Blood samples were collected during and after the infusion. The accuracy of the model was verified with distinctive fitting of 10 new glioma patient data from the Finnish BNCT-trials. The 10 B- concentration in whole blood samples was determined by ICP-AES method. In the study it is concluded that the constructed non-linear model is flexible and capable in describing the kinetics of 10 B concentration in blood after a single infusion of BPA-F. (author)

  13. Effects of BPA and E2 on expression profiles of genes related to hypothalamic-pituitary-gonadal axis of half-smooth tongue sole Cynoglossus semilaevis

    Science.gov (United States)

    Li, Fengling; Li, Zhaoxin; Wang, Qingyin; Zhai, Yuxiu

    2013-05-01

    Endocrine disrupting chemicals (EDCs) are increasingly viewed as persistent pollutants, similar to natural hormones in function. This paper describes the expression profiles of 7 genes ( DMRT, VTG GnRHR FSHR CYP17A CYP19A, and CYP19B) involved in sex steroid synthesis and action as well as sexual development in adult male and female Cynoglossus semilaevis, after exposure to different concentrations of Bisphenol A (BPA) and 17β-estradiol (E2). Both BPA (1, 10, 50, 125, and 250 mg/kg) and E2 (0.5, 5, and 10 mg/kg) induced changes in target gene expression, although the estrogenic effects of E2 as a model estrogen were stronger. Among the 7 genes, VTG CYP17A and CYP19 responded strongly to BPA or E2 exposure and can thus serve as reference biomarkers for estrogenic EDCs exposure in marine teleosts. These data will provide a window to establish a hypothalamic-pituitary-gonadal model in C. semilaevis to better understand the effect pathways of EDCs.

  14. Forrest Ranch Management and Implementation, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brent

    2004-01-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  15. Forrest Ranch Acquisition, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brent

    2003-08-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  16. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  17. Superconducting magnetic energy storage (SMES) program. Progress report, January 1-December 31, 1984

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1985-05-01

    The 30 MJ, 10 MW superconducting magnetic energy storage (SMES) system was devised to interact in the Western US Power System as an alternate means to damp unstable oscillations at 0.35 Hz on the Pacific HVAC Intertie. The SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration (BPA). The operating limits of the 30 MJ SMES unit were established, and different means of controlling real and reactive power were tested. The unit can follow a sinusoidal power demand signal with an amplitude of up to 8.6 MW with the converter working in a 12 pulse mode. When the converter operates in the constant VAR mode, a time varying real power demand signal of up to 5 MW can be met. Experiments showed that the Pacific ac Intertie has current and reactive power variations of the same frequency as the modulating frequency of the SMES device. Endurance tests were run to assess the reliability of the SMES subsystems with a narrow band noise input, which is characteristic of the modulation signal for stabilizer operation. During the endurance tests, parameters of the ac power system were determined. Converter short circuit tests, load tests under various control conditions, dc breaker tests for coil current interruption, and converter failure mode tests were conducted. The experimental operation of the SMES system was concluded and the operation was terminated in early 1984

  18. 77 FR 74842 - Sunshine Act Meeting Notice

    Science.gov (United States)

    2012-12-18

    ... Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville Power Administration. E-3 EL11-44-002... Horizon Wind Energy LLC v. Bonneville Power Administration. E-4 RM11-12-000 Availability of E-Tag... event is available through www.ferc.gov . Anyone with Internet access who desires to view this event can...

  19. Modeling Episodic Ephemeral Brine Lake Evaporation and Salt Crystallization on the Bonneville Salt Flats, Utah

    Science.gov (United States)

    Liu, T.; Harman, C. J.; Kipnis, E. L.; Bowen, B. B.

    2017-12-01

    Public concern about apparent reductions in the areal extent of the Bonneville Salt Flat (BSF) and perceived changes in inundation frequency has motivated renewed interest in the hydrologic and geochemical behavior of this salt playa. In this study, we develop a numerical modeling framework to simulate the relationship between hydrometeorologic variability, brine evaporation and salt crystallization processes on BSF. The BSF, locates in Utah, is the remnant of paleo-lake Bonneville, and is capped by up to 1 meter of salt deposition over a 100 km2 area. The BSF has two distinct hydrologic periods each year: a winter wet periods with standing surface brine and the summer dry periods when the brine is evaporated, exposing the surface salt crust. We develop a lumped non-linear dynamical models coupling conservation expressions from water, dissolved salt and thermal energy to investigate the seasonal and diurnal behavior of brine during the transition from standing brine to exposed salt at BSF. The lumped dynamic models capture important nonlinear and kinetic effects introduced by the high ionic concentration of the brine, including the pronounced effect of the depressed water activity coefficient on evaporation. The salt crystallization and dissolution rate is modeled as a kinetic process linearly proportional to the degree of supersaturation of brine. The model generates predictions of the brine temperature and the solute and solvent masses controlled by diurnal net radiation input and aerodynamic forcing. Two distinct mechanisms emerge as potential controls on salt production and dissolution: (1) evapo-concentration and (2) changes in solubility related to changes in brine temperature. Although the evaporation of water is responsible for ultimate disappearance of the brine each season ,variation in solubility is found to be the dominant control on diurnal cycles of salt precipitation and dissolution in the BSF case. Most salt is crystallized during nighttime, but the

  20. Exposición a Bisfenol A (BPA en mujeres embarazadas y su relación con la obesidad en sus hijos: revisión sistemática

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Gómez-Mercado

    2018-01-01

    Full Text Available Introducción: El bisfenol A (BPA es un contaminante químico no persistente que altera el funcionamiento normal del sistema endocrino. Se sugiere que la exposición prenatal se asocia con la obesidad en la descendencia. Objetivo: Revisar la literatura sobre la exposición al BPA en mujeres embarazadas y su relación con la obesidad en sus hijos. Metodología: Revisión sistemática de acuerdo a la guía PRISMA. Se realizaron búsquedas en las bases de datos Pubmed, ScienceDirect, Clinical Key, Medline, Ebsco y Scielo y el motor de búsqueda Google Scholar hasta el 30 de Abril de 2017 por dos investigadores independientes que utilizaron los mismos términos de búsqueda. Se incluyeron estudios prospectivos de cohorte realizados que midieron el BPA en la orina materna. Resultados: Se incluyeron 5 estudios con tamaños de muestra entre 297 y 757 binomios madre e hijo, se encontró asociación positiva entre la exposición prenatal a BPA con la circunferencia de cintura en niños de cuatro años β: 0.28 (IC95%:0.01 a 0.57 y el índice de masa grasa β: 0.31 (IC95%: 0.01 a 0.60 en dos de los estudios. Se observaron asociaciones positivas y/o negativas no significativas con índice de masa corporal y su puntaje Z, porcentaje de grasa, sobrepeso/obesidad, peso y talla al nacer, porcentaje de masa grasa. Conclusión: Los resultados de estudios epidemiológicos de cohorte, limita las afirmaciones sobre un vínculo causal entre la exposición prenatal BPA y la obesidad postnatal.

  1. Wastewater treatment facilities: Energy efficient improvements and cogeneration

    International Nuclear Information System (INIS)

    Kunkle, R.; Gray, R.; Delzel, D.

    1992-10-01

    The Washington State Energy Office (WSEO) has worked with both the Bonneville Power Administration (BPA) and the US Department of Energy to provide technical and financial assistance to local governments. Based on a recent study conducted by Ecotope for WSEO, local governments spend an estimated $45 million on utility bills statewide. Water and wastewater facilities account for almost a third of this cost. As a result, WSEO decided to focus its efforts on the energy intensive water and wastewater sector. The ultimate goal of this project was to develop mechanisms to incorporate energy efficiency improvements into wastewater treatment facilities in retrofits and during upgrades, remodels, and new construction. Project activities included the following: The review of the existing regulatory environment for treatment system construction, A summary of financing options for efficiency improvements in treatment facilities, A literature review of energy efficiency opportunities in treatment plants, Survey and site visits to characterize existing facilities in Washington State, Estimates of the energy efficiency and cogeneration potential in the sector, and A case study to illustrate the implementation of an efficiency improvement in a treatment facility

  2. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  3. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  4. Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.

  5. Snake River Sockeye Salmon Habitat and Limnological Research; 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Teuscher, David (Shoshone-Bannock Tribes, Fort Hall, ID); Wurtsbaugh, Wayne A. (Utah State University, Department of Fisheries and Wildlife, Ecology Center and Watershed Science Unit); Taki, Doug (Shoshone-Bannock Tribes, Fort Hall, ID)

    1994-06-01

    In 1990 the Shoshone-Bannock Tribes (SBT) petitioned the National Marine Fisheries Service (NMFS) to list Snake River Sockeye salmon as endangered. As a result, Snake River Sockeye were listed and the Bonneville Power Administration (BPA) began funding efforts to enhance sockeye stocks. Recovery efforts include development of a brood stock program, genetics work, describing fish community dynamics in rearing lakes, and completing limnology studies. The SBT, in cooperation with Idaho Department of Fish and Game (IDFG), are directing fish community and limnology studies. IDFG is managing the brood stock program. The University of Idaho and NMFS are completing genetics work. Part I of this document is the SBT 1993' annual report that describes findings related to fish community research. Part II is a document completed by Utah State University (USU). The SBT subcontracted USU to complete a limnology investigation on the Sawtooth Valley Lakes. Management suggestions in Part II are those of USU and are not endorsed by the SBT and may not reflect the opinions of SBT biologists.

  6. A cancer research UK pharmacokinetic study of BPA-mannitol in patients with high grade glioma to optimise uptake parameters for clinical trials of BNCT

    Energy Technology Data Exchange (ETDEWEB)

    Cruickshank, G.S. [University of Birmingham and University Hospital Birmingham, Birmingham (United Kingdom)], E-mail: garth.cruickshank@uhb.nhs.uk; Ngoga, D.; Detta, A.; Green, S.; James, N.D.; Wojnecki, C.; Doran, J.; Hardie, J.; Chester, M.; Graham, N.; Ghani, Z. [University of Birmingham and University Hospital Birmingham, Birmingham (United Kingdom); Halbert, G.; Elliot, M.; Ford, S. [CR-UK Formulation Unit, University of Strathclyde, Glasgow (United Kingdom); Braithwaite, R.; Sheehan, T.M.T. [Regional Laboratory for Toxicology, Sandwell and West Birmingham Hospitals Trust, Birmingham (United Kingdom); Vickerman, J.; Lockyer, N. [Surface Analysis Research Centre, University of Manchester, Manchester (United Kingdom); Steinfeldt, H.; Croswell, G. [CR-UK Drug Development Office, London (United Kingdom)] (and others)

    2009-07-15

    This paper describes results to-date from a human pharmacokinetic study which began recruitment in December 2007. Results are presented for a single patient recruited in December 2007. A second patient was recruited in July 2008 but detailed data are not available at the time of writing. The trial is an open-label, non-comparative, non-therapeutic study of BPA-mannitol in patients with high-grade glioma, who will be undergoing stereotactic brain biopsy as part of the diagnostic process before definitive treatment. The study investigates the route of infusion (intra-venous (IV) or intra-carotid artery) and in each case will assess the effect of administration of mannitol as a blood-brain barrier disrupter. All cohorts will receive a 2 h infusion of BPA-mannitol, and for some cohorts an additional mannitol bolus will be administered at the beginning of this infusion. Measurements are made by inductively coupled plasma mass spectrometry (ICP-MS) of {sup 10}B concentration in samples of blood, urine, extra-cellular fluid in normal brain (via a dialysis probe), brain tissue around tumour and tumour tissue. Additional analysis of the tumour tissue is performed using secondary ion mass spectrometry (SIMS). The first patient was part of the cohort having intra-venous infusion without mannitol bolus. No serious clinical problems were experienced and the assay results can be compared with available patient data from other BNCT centres. In particular we note that the peak {sup 10}B concentration in blood was 28.1 mg/ml for a total BPA administration of 350 mg/kg which is very consistent with the previous experience with BPA-fructose reported by the Helsinki group.

  7. In vitro impact of bisphenols BPA, BPF, BPAF and 17β-estradiol (E2) on human monocyte-derived dendritic cell generation, maturation and function.

    Science.gov (United States)

    Švajger, Urban; Dolenc, Marija Sollner; Jeras, Matjaž

    2016-05-01

    Bisphenols (BPs) are widely spread pollutants that act as estrogen-like endocrine disruptors and are potentially affecting human health on a long run. We explored the effects of BPA, BPF and BPAF, on in vitro differentiation and maturation of MDDCs. Monocytes were treated with 17β-estradiol (E2) and each BP at the beginning of their differentiation into iMDDCs. We found that 10 and 50 μM of BPA and BPF, 10 and 30μM of BPAF and 10 and 50 nM of E2 did not affect cell viability. However, 50 μM of BPA and BPF, as well as 10 and 30 μM of BPAF, significantly decreased the endocytotic capacity of iMDDCs. Both, BPA (50 μM) and BPAF (30 μM) decreased the expression of CD1a and increased the amount of DC-SIGN molecules on iMDDCs. The E2 pre-treatment moderately decreased expression of CD80, CD86 and CD83 co-stimulatory molecules while increasing the numbers of HLA-DR on mMDDCs. Only BPAF significantly influenced the expression of CD80 and CD86 (both decreased), as well as CD83 and HLA-DR molecules (both increased) on mMDDCs. In addition, BPAF modulated DC maturation signaling pathways by lowering the phosphorylation of p65 NF-κB (nuclear factor-kappaB) and ERK (extracellular signal regulated kinase) 1/2 proteins. Consequently, the in vitro proliferation of allogeneic T cells, stimulated with differently pre-treated iMDDCs and mMDDCs, was significantly reduced only in case of BPAF. Copyright © 2016 Elsevier B.V. All rights reserved.

  8. A cancer research UK pharmacokinetic study of BPA-mannitol in patients with high grade glioma to optimise uptake parameters for clinical trials of BNCT

    International Nuclear Information System (INIS)

    Cruickshank, G.S.; Ngoga, D.; Detta, A.; Green, S.; James, N.D.; Wojnecki, C.; Doran, J.; Hardie, J.; Chester, M.; Graham, N.; Ghani, Z.; Halbert, G.; Elliot, M.; Ford, S.; Braithwaite, R.; Sheehan, T.M.T.; Vickerman, J.; Lockyer, N.; Steinfeldt, H.; Croswell, G.

    2009-01-01

    This paper describes results to-date from a human pharmacokinetic study which began recruitment in December 2007. Results are presented for a single patient recruited in December 2007. A second patient was recruited in July 2008 but detailed data are not available at the time of writing. The trial is an open-label, non-comparative, non-therapeutic study of BPA-mannitol in patients with high-grade glioma, who will be undergoing stereotactic brain biopsy as part of the diagnostic process before definitive treatment. The study investigates the route of infusion (intra-venous (IV) or intra-carotid artery) and in each case will assess the effect of administration of mannitol as a blood-brain barrier disrupter. All cohorts will receive a 2 h infusion of BPA-mannitol, and for some cohorts an additional mannitol bolus will be administered at the beginning of this infusion. Measurements are made by inductively coupled plasma mass spectrometry (ICP-MS) of 10 B concentration in samples of blood, urine, extra-cellular fluid in normal brain (via a dialysis probe), brain tissue around tumour and tumour tissue. Additional analysis of the tumour tissue is performed using secondary ion mass spectrometry (SIMS). The first patient was part of the cohort having intra-venous infusion without mannitol bolus. No serious clinical problems were experienced and the assay results can be compared with available patient data from other BNCT centres. In particular we note that the peak 10 B concentration in blood was 28.1 mg/ml for a total BPA administration of 350 mg/kg which is very consistent with the previous experience with BPA-fructose reported by the Helsinki group.

  9. Long-term effects of a binary mixture of perfluorooctane sulfonate (PFOS) and bisphenol A (BPA) in zebrafish (Danio rerio)

    DEFF Research Database (Denmark)

    Keiter, Susanne; Baumann, Lisa; Farber, H

    2012-01-01

    aimed at evaluating the long-term effects and toxicity-increasing behavior of PFOS in vivo using the zebrafish (Danio rerio). Fish were maintained in flow-through conditions and exposed to single and binary mixtures of PFOS and the endocrine disruptor bisphenol A (BPA) at nominal concentrations of 0...

  10. Estimates of dietary exposure to bisphenol A (BPA) from light metal packaging using food consumption and packaging usage data: a refined deterministic approach and a fully probabilistic (FACET) approach.

    Science.gov (United States)

    Oldring, P K T; Castle, L; O'Mahony, C; Dixon, J

    2014-01-01

    The FACET tool is a probabilistic model to estimate exposure to chemicals in foodstuffs, originating from flavours, additives and food contact materials. This paper demonstrates the use of the FACET tool to estimate exposure to BPA (bisphenol A) from light metal packaging. For exposure to migrants from food packaging, FACET uses industry-supplied data on the occurrence of substances in the packaging, their concentrations and construction of the packaging, which were combined with data from a market research organisation and food consumption data supplied by national database managers. To illustrate the principles, UK packaging data were used together with consumption data from the UK National Diet and Nutrition Survey (NDNS) dietary survey for 19-64 year olds for a refined deterministic verification. The UK data were chosen mainly because the consumption surveys are detailed, data for UK packaging at a detailed level were available and, arguably, the UK population is composed of high consumers of packaged foodstuffs. Exposures were run for each food category that could give rise to BPA from light metal packaging. Consumer loyalty to a particular type of packaging, commonly referred to as packaging loyalty, was set. The BPA extraction levels used for the 15 types of coating chemistries that could release BPA were in the range of 0.00005-0.012 mg dm(-2). The estimates of exposure to BPA using FACET for the total diet were 0.0098 (mean) and 0.0466 (97.5th percentile) mg/person/day, corresponding to 0.00013 (mean) and 0.00059 (97.5th percentile) mg kg(-1) body weight day(-1) for consumers of foods packed in light metal packaging. This is well below the current EFSA (and other recognised bodies) TDI of 0.05 mg kg(-1) body weight day(-1). These probabilistic estimates were compared with estimates using a refined deterministic approach drawing on the same input data. The results from FACET for the mean, 95th and 97.5th percentile exposures to BPA lay between the

  11. Transmission line capital costs

    International Nuclear Information System (INIS)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy's Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs

  12. Lake Roosevelt Fisheries Monitoring Program; 1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Janelle R.; Scholz, Allan T. (Eastern Washington University, Upper Columbia United Tribes Fisheries Research Center, Cheney, WA)

    1991-09-01

    As partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam, the Northwest Power Planning Council directed Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries on Lake Roosevelt (NPPC 1987 [Section 903 (g)(l)(C)]). The hatcheries are to produce 8 million kokanee salmon fry or 3.2 million adults for outplanting into Lake Roosevelt as well as 500,000 rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen programs. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. The monitoring program included the following components: (1) conduction of a year-round creel census survey to determine angler pressure, catch rates and composition, growth and condition of fish caught by anglers, and economic value of the fishery. Comparisons will be made before and after hatcheries are on-line to determine hatchery effectiveness; (2) conduct an assessment of kokanee, rainbow trout, and walleye feeding habits, growth rates, and densities of their preferred prey at different locations in the reservoir and how reservoir operations affect population dynamics of preferred prey organisms. This information will be used to determine kokanee and rainbow trout stocking locations, stocking densities and stocking times; (3) conduct a mark-recapture study designed to assess effectiveness of various release times and locations for hatchery-raised kokanee and net-pen raised rainbow so fish-loss over Grand Coulee Dam will be minimized, homing to egg collection sites will be improved and angler harvest will be increased. The above measures were adopted by the Council based on a management plan developed by Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and the National Park Service. This plan examined the

  13. Yakima Fisheries Project revised Draft Environmental Impact Statement: Summary

    International Nuclear Information System (INIS)

    1995-05-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and enhancement activities in the Yakima River Basin. The State of Washington and the Yakima Indian Nation would jointly direct the project. The Yakima River system is a promising location for mitigation and enhancement to compensate for stock losses from development and operation of hydroelectric projects elsewhere in the Columbia Basin. The YFP would help determine the role that supplementation might play in increasing natural production of anadromous salmonids throughout the Columbia Basin. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities. The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two alternatives have been proposed: Alternative 1 would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative 2 (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin. (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  14. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  15. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  16. Identification of secretaglobin Scgb2a1 as a target for developmental reprogramming by BPA in the rat prostate.

    Science.gov (United States)

    Wong, Rebecca Lee Yean; Wang, Quan; Treviño, Lindsey S; Bosland, Maarten C; Chen, Jing; Medvedovic, Mario; Prins, Gail S; Kannan, Kurunthachalam; Ho, Shuk-Mei; Walker, Cheryl Lyn

    2015-01-01

    Secretoglobins are a superfamily of secreted proteins thought to participate in inflammation, tissue repair, and tumorigenesis. Secretoglobin family 2A member 1 (Scgb2a1) is a component of prostatein, a major androgen-binding protein secreted by the rat prostate. Using a rat model for developmental reprogramming of susceptibility to prostate carcinogenesis, we identified, by RNA-seq, that Scgb2a1 is significantly upregulated (>100-fold) in the prostate of adult rats neonatally exposed to bisphenol A (BPA), with increased gene expression confirmed by quantitative RT-PCR and chromatin immunoprecipitation for histone H3 lysine 9 acetylation. Bisulfite analysis of both CpG islands located within 10 kb of the Scgb2a1 promoter identified significant hypomethylation of the CpG island upstream of the transcription start site of this gene in the reprogrammed prostate. These data suggest that expression of Scgb2a1 in the adult prostate could be epigenetically reprogrammed by BPA exposure during prostate development, with potential implications for cancer risk and response to chemotherapeutics associated with prostatein binding.

  17. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  18. Intuitionistic fuzzy evidential power aggregation operator and its application in multiple criteria decision-making

    Science.gov (United States)

    Jiang, Wen; Wei, Boya

    2018-02-01

    The theory of intuitionistic fuzzy sets (IFS) is widely used for dealing with vagueness and the Dempster-Shafer (D-S) evidence theory has a widespread use in multiple criteria decision-making problems under uncertain situation. However, there are many methods to aggregate intuitionistic fuzzy numbers (IFNs), but the aggregation operator to fuse basic probability assignment (BPA) is rare. Power average (P-A) operator, as a powerful operator, is useful and important in information fusion. Motivated by the idea of P-A power, in this paper, a new operator based on the IFS and D-S evidence theory is proposed, which is named as intuitionistic fuzzy evidential power average (IFEPA) aggregation operator. First, an IFN is converted into a BPA, and the uncertainty is measured in D-S evidence theory. Second, the difference between BPAs is measured by Jousselme distance and a satisfying support function is proposed to get the support degree between each other effectively. Then the IFEPA operator is used for aggregating the original IFN and make a more reasonable decision. The proposed method is objective and reasonable because it is completely driven by data once some parameters are required. At the same time, it is novel and interesting. Finally, an application of developed models to the 'One Belt, One road' investment decision-making problems is presented to illustrate the effectiveness and feasibility of the proposed operator.

  19. Annual Report to the Bonneville Power Administration, Reporting Period: April 2008 - February 2009 [re: "Survival and Growth in the Columbia River Plume and north California Current"].

    Energy Technology Data Exchange (ETDEWEB)

    Northwest Fisheries Science Center, NOAA Fisheries; Cooperative Institute for Marine Resources Studies, Oregon State University; OGI School of Science & Engineering, Oregon Health Sciences University.

    2009-07-17

    We have made substantial progress toward our objectives outlined in our BPA supported proposal entitled 'Columbia River Basin Juvenile Salmonids: Survival and Growth in the Columbia River Plume and northern California Current' which we report on herein. During 2008, we were able to successfully conduct 3 mesoscale cruises. We also were able to conduct 7 biweekly predator cruises, along with substantial shore-based visual observations of seabirds. Detailed results of the mesoscale cruises are available in the Cruise Reports and summarized in the next section. We have taken a proactive approach to getting the results of our research to fisheries managers and the general public. We have begun to make annual predictions based on ocean conditions of the relative survival of juvenile coho and Chinook salmon well before they return as adults. This is based on both biological and physical indicators that we measure during our surveys or collect from outside data sources. Examples of our predictions for 2009 and 2010 are available on the following web site: http://www.nwfsc.noaa.gov/research/divisions/fed/oeip/a-ecinhome.cfm.

  20. Pacific Northwest Electric Power Planning and Conservation Act : Legislative History of the Act to Assist the Electrical Consumers of the Pacific Northwest through use of the Federal Columbia River Power System to Achieve Cost-Effective Energy Conservation : P.L. 96-501, 94 Stat. 2697.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1981-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act became effective when it was signed into law by President Carter on December 5, 1980. This ended a four-year debate over legislation designed to plan and coordinate the region's energy future. This legislative history is an abbreviated version taken from the larger historical file maintained by the BPA Law Library. It is intended to assist BPA personnel and others who are studying the Northwest Power Act and working on its implementation. The documents included were selected for their value in determining what Congress meant in enacting the statute and to provide the researcher with a starting point for further investigation. These documents include: a history of the Act, a chronology of the legislative action leading to passage of the law; a section-by-section analysis of the Act; the Congressional Records of Senate and House debates on the bill and its amendments, and a list of Congressional committee hearings.

  1. Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

    2008-03-12

    The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

  2. Columbia River system operation review: Final environmental impact statement. Appendix R, Pacific Northwest Coordination agreement (PNCA)

    International Nuclear Information System (INIS)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region's non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region's power producers to maximize the power system's reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest's hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement

  3. Umatilla River Subbasin Fish Habitat Improvement Program, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-05-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat conditions. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, through the restoration of stable channel function. This report provides a summary of Program activities for the 2005 calendar year (January 1 through December 31, 2005), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance (O&M), and (4) Monitoring and Evaluation (M&E). This report also summarizes activities associated with Program Administration, Interagency Coordination, and Public Education.

  4. Bateria Psicológica para Avaliação da Atenção (BPA): desempenho de diferentes faixas etárias Batería Psicológica para Evaluación de la Atención (BPA): desempeño de distintos rangos etarios Psychological Battery for Attention Assessment (BPA): performance of different age groups

    OpenAIRE

    Fabián Javier Marín Rueda; Rebecca de Magalhães Monteiro

    2013-01-01

    O objetivo do estudo foi analisar o desempenho atencional em diferentes momentos da vida. Participaram 1.759 pessoas, de ambos os sexos, e com idades variando de 6 até 82 anos. O instrumento utilizado foi a Bateria Psicológica para Avaliação da Atenção (BPA), composta pelos testes de Atenção Concentrada, Atenção Dividida e Atenção Alternada. Os resultados estão de acordo com o apontado pela literatura ao relacionar a atenção com as diferentes etapas do desenvolvimento. Nesse sentido, observou...

  5. Are Ducted Mini-Splits Worth It?

    Energy Technology Data Exchange (ETDEWEB)

    Winkler, Jonathan M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Maguire, Jeffrey B [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Metzger, Cheryn E. [Pacific Northwest National Laboratory; Zhang, Jason [Pacific Northwest National Laboratory

    2018-02-01

    Ducted mini-split heat pumps are gaining popularity in some regions of the country due to their energy-efficient specifications and their ability to be hidden from sight. Although product and install costs are typically higher than the ductless mini-split heat pumps, this technology is well worth the premium for some homeowners who do not like to see an indoor unit in their living area. Due to the interest in this technology by local utilities and homeowners, the Bonneville Power Administration (BPA) has funded the Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL) to develop capabilities within the Building Energy Optimization (BEopt) tool to model ducted mini-split heat pumps. After the fundamental capabilities were added, energy-use results could be compared to other technologies that were already in BEopt, such as zonal electric resistance heat, central air source heat pumps, and ductless mini-split heat pumps. Each of these technologies was then compared using five prototype configurations in three different BPA heating zones to determine how the ducted mini-split technology would perform under different scenarios. The result of this project was a set of EnergyPlus models representing the various prototype configurations in each climate zone. Overall, the ducted mini-split heat pumps saved about 33-60% compared to zonal electric resistance heat (with window AC systems modeled in the summer). The results also showed that the ducted mini-split systems used about 4% more energy than the ductless mini-split systems, which saved about 37-64% compared to electric zonal heat (depending on the prototype and climate).

  6. Dust Measurement of Two Organophosphorus Flame Retardants, Resorcinol Bis(diphenylphosphate) (RBDPP) and Bisphenol A Bis(diphenylphosphate) (BPA-BDPP), Used as Alternatives for BDE-209

    NARCIS (Netherlands)

    Brandsma, S.H.; Sellström, U.; de Wit, C.A.; de Boer, J.; Leonards, P.E.G.

    2013-01-01

    Resorcinol bis(diphenylphosphate) (RBDPP) and bisphenol A bis(diphenylphosphate) (BPA-BDPP) are two halogen-free organophosphorus flame retardant (PFRs) that are used as an alternative for the decabromodiphenyl ether (Deca-BDE) technical mixture in TV/flatscreen housing and other electronic consumer

  7. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study; FINAL

    International Nuclear Information System (INIS)

    Cook, Chris B; Richmond, Marshall C; Guensch, Greg

    2001-01-01

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating

  8. Determination of BPA, BPB, BPF, BADGE and BFDGE in canned energy drinks by molecularly imprinted polymer cleaning up and UPLC with fluorescence detection.

    Science.gov (United States)

    Gallo, Pasquale; Di Marco Pisciottano, Ilaria; Esposito, Francesco; Fasano, Evelina; Scognamiglio, Gelsomina; Mita, Gustavo Damiano; Cirillo, Teresa

    2017-04-01

    A new method for simultaneous determination of five bisphenols in canned energy drinks by UPLC with fluorescence detection, after clean up on molecularly imprinted polymers, is herein described. The method was validated at two concentration levels, calculating trueness, repeatability and within-laboratory reproducibility, specificity, linearity of detector response, the limits of quantifications and the limits of detection for each bisphenol. The method is specific, reliable and very sensitive, allowing for determination of bisphenol F diglycidyl ether (BFDGE), bisphenol A (BPA), bisphenol B (BPB), bisphenol F (BPF) and bisphenol A diglycidyl ether (BADGE) down to 0.50ng/mL; it was employed to determine contamination levels from these bisphenols in forty energy drinks of different brands, collected from the market in Naples. BPA was detected in 17 out of 40 samples (42.5%); in some energy drinks also BPF, BADGE and BFDGE were determined. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. Ford Hatchery; Washington Department of Fish and Wildlife Fish Program, Hatcheries Division, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Lovrak, Jon; Ward, Glen

    2004-01-01

    Bonneville Power Administration's participation with the Washington Department of Fish and Wildlife, Ford Hatchery, provides the opportunity for enhancing the recreational and subsistence kokanee fisheries in Banks Lake. The artificial production and fisheries evaluation is done cooperatively through the Spokane Hatchery, Sherman Creek Hatchery (WDFW), Banks Lake Volunteer Net Pen Project, and the Lake Roosevelt Fisheries Evaluation Program. Ford Hatchery's production, together with the Sherman Creek and the Spokane Tribal Hatchery, will contribute to an annual goal of one million kokanee yearlings for Lake Roosevelt and 1.4 million kokanee fingerlings and fry for Banks Lake. The purpose of this multi-agency program is to restore and enhance kokanee salmon and rainbow trout populations in Lake Roosevelt and Banks Lake due to Grand Coulee Dam impoundments. The Ford Hatchery will produce 9,533 lbs. (572,000) kokanee annually for release as fingerlings into Banks Lake in October. An additional 2,133 lbs. (128,000) kokanee will be transferred to net pens on Banks Lake at Electric City in October. The net pen raised kokanee will be reared through the fall, winter, and early spring to a total of 8,533 lbs and released in May. While the origin of kokanee comes from Lake Whatcom, current objectives will be to increase the use of native (or, indigenous) stocks for propagation in Banks Lake and the Upper Columbia River. Additional stocks planned for future use in Banks Lake include Lake Roosevelt kokanee and Meadow Creek kokanee. The Ford Hatchery continues to produce resident trout (80,584 lb. per year) to promote the sport fisheries in trout fishing lakes in eastern Washington (WDFW Management, Region 1). Operation and maintenance funding for the increased kokanee program was implemented in FY 2001 and scheduled to continue through FY 2010. Funds from BPA allow for an additional employee at the Ford Hatchery to assist in the operations and maintenance associated

  10. Transmission System Vegetation Management Program. Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for Bonneville and the public, and interfere with their ability to maintain these facilities. They need to (1) keep vegetation away from the electric facilities; (2) increase their program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools they can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management

  11. 2007-2008 Annual Progress Report for BPA Grant Exp Restore Walla Walla River Flow

    Energy Technology Data Exchange (ETDEWEB)

    Bower, Bob [WWBWC (Walla Walla Basin Watershed Council)

    2009-07-10

    WWBWC and its partners have been working on a wide variety of conservation and aquifer recharge related activities including: monitoring groundwater and surface water conditions, creating a geospatial database for the Walla Walla River valley (project focal area), expanding aquifer recharge testing at the HBDIC site and conducting an extensive outreach/education program by which to share the information, ideas and potential solutions to our current water management issues in this basin. This report is an outline of those activities and is accompanied by individual program-component (attached as appendices) reports for the areas that BPA is assisting to fund these on-the-ground projects along with the innovative research and monitoring being done to further aquifer recharge as a water management tool for the Pacific Northwest.

  12. Rainwater Wildlife Area Habitat Evaluation Procedures Report; A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2004-01-01

    The 8,768 acre Rainwater Wildlife Area was acquired in September 1998 by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through an agreement with Bonneville Power Administration (BPA) to partially offset habitat losses associated with construction of the John Day and McNary hydroelectric facilities on the mainstem Columbia River. U.S. Fish and Wildlife Service (USFWS) Habitat Evaluation Procedures (HEP) were used to determine the number of habitat units credited to BPA for acquired lands. Upland and riparian forest, upland and riparian shrub, and grassland cover types are evaluated in this study. Targeted wildlife species include downy woodpecker (Picoides pubescens), black-capped chickadee (Parus atricopillus), blue grouse (Dendragapus obscurus), great blue heron (Ardea herodias), yellow warbler (Dendroica petechia), mink (Mustela vison), and Western meadowlark (Sturnella neglecta). Habitat surveys were conducted in 1998 and 1999 in accordance with published HEP protocols and included 65,300, 594m{sup 2}2 plots, and 112 one-tenth-acre plots. Between 153.3 and 7,187.46 acres were evaluated for each target wildlife mitigation species. Derived habitat suitability indices were multiplied by corresponding cover-type acreages to determine the number of habitat units for each species. The total baseline habitat units credited to BPA for the Rainwater Wildlife Area and its seven target species is 5,185.3 habitat units. Factors limiting habitat suitability are related to the direct, indirect, and cumulative effects of past livestock grazing, road construction, and timber harvest which have simplified the structure, composition, and diversity of native plant communities. Alternatives for protecting and improving habitat suitability include exclusion of livestock grazing, road de-commissioning/obliteration, reforestation and thinning, control of competing and unwanted vegetation (including noxious weeds), reestablishing displaced or reduced native

  13. Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, Scott

    2009-04-10

    Creek, an extirpated area, will be stocked (smolts and adults) with Catherine Creek origin salmon to initiate natural production in unseeded habitat, and to initiate future harvest opportunities. The current production levels have been incorporated into the U.S. v. Oregon Interim Management Agreement. The purpose of this contract is to integrate Bonneville Power Administration (BPA) efforts with the Lower Snake River Compensation Plan (LSRCP) program utilizing Lookingglass Hatchery as the primary rearing facility. BPA constructed an adult holding and spawning structure on the hatchery grounds; however, maintenance of this infrastructure was discontinued due to funding limitation and transferred to the LSRCP program in 2007. These integrated efforts focus on holding and spawning adults, rearing juveniles, fish health, and monitoring natural production (Redd counts) for Catherine Creek, Lostine River, and Upper Grande Ronde stocks.

  14. Pacific Lamprey Research and Restoration : Annual Report 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

    1998-08-05

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

  15. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  16. Habitat Evaluation Procedures (HEP) Report : Oleson Tracts of the Tualatin River National Wildlife Refuge, 2001-2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Allard, Donna; Smith, maureen; Schmidt, Peter

    2004-09-01

    Located in the northern Willamette River basin, Tualatin River National Wildlife Refuge (Refuge) was established in 1992 with an approved acquisition boundary to accommodate willing sellers with potentially restorable holdings within the Tualatin River floodplain. The Refuge's floodplain of seasonal and emergent wetlands, Oregon ash riparian hardwood, riparian shrub, coniferous forest, and Garry oak communities are representative of remnant plant communities historically common in the Willamette River valley and offer an opportunity to compensate for wildlife habitat losses associated with the Willamette River basin federal hydroelectric projects. The purchase of the Oleson Units as additions to the Refuge using Bonneville Power Administration (BPA) funds will partially mitigate for wildlife habitat and target species losses incurred as a result of construction and inundation activities at Dexter and Detroit Dams. Lands acquired for mitigation of Federal Columbia River Power System (FCRPS) impacts to wildlife are evaluated using the Habitat Evaluation Procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the FCRPS Loss Assessments and adopted as part of the Northwest Power and Conservation Council's Fish and Wildlife Program as a BPA obligation (NWPCC, 1994 and 2000). There are two basic management scenarios to consider for this evaluation: (1) Habitats can be managed without restoration activities to benefit wildlife populations, or (2) Habitats can be restored using a number of techniques to improve habitat values more quickly. Without restoration, upland and wetland areas may be periodically mowed and disced to prevent invasion of exotic vegetation, volunteer trees and shrubs may grow to expand forested areas, and cooperative farming may be employed to provide forage for migrating and wintering waterfowl. Abandoned cropland

  17. Fish Passage Assessment: Big Canyon Creek Watershed, Technical Report 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Christian, Richard

    2004-02-01

    This report presents the results of the fish passage assessment as outlined as part of the Protect and Restore the Big Canyon Creek Watershed project as detailed in the CY2003 Statement of Work (SOW). As part of the Northwest Power Planning Council's Columbia Basin Fish and Wildlife Program (FWP), this project is one of Bonneville Power Administration's (BPA) many efforts at off-site mitigation for damage to salmon and steelhead runs, their migration, and wildlife habitat caused by the construction and operation of federal hydroelectric dams on the Columbia River and its tributaries. The proposed restoration activities within the Big Canyon Creek watershed follow the watershed restoration approach mandated by the Fisheries and Watershed Program. Nez Perce Tribal Fisheries/Watershed Program vision focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects. We strive toward maximizing historic ecosystem productive health, for the restoration of anadromous and resident fish populations. The Nez Perce Tribal Fisheries/Watershed Program (NPTFWP) sponsors the Protect and Restore the Big Canyon Creek Watershed project. The NPTFWP has the authority to allocate funds under the provisions set forth in their contract with BPA. In the state of Idaho vast numbers of relatively small obstructions, such as road culverts, block thousands of miles of habitat suitable for a variety of fish species. To date, most agencies and land managers have not had sufficient, quantifiable data to adequately address these barrier sites. The ultimate objective of this comprehensive inventory and assessment was to identify all barrier crossings within the watershed. The barriers were then prioritized according to the

  18. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  19. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  20. Monitoring of downstream salmon and steelhead trout at federal hydroelectric facilities, annual report 2001.; ANNUAL

    International Nuclear Information System (INIS)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    2002-01-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River (Figure 1). The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration

  1. Microwave irradiation induced modifications on the interfaces in SAN/EVA/PVC and PVAc/BPA/PVP ternary polymer blends: Positron lifetime study

    International Nuclear Information System (INIS)

    Dinesh, Meghala; Chikkakuntappa, Ranganathaiah

    2013-01-01

    Ternary polymer blends of poly(styrene-co-acrylonitrile)/poly(ethylene-co-vinylacetate)/poly(vinyl chloride) (SAN/EVA/PVC) and poly(vinyl acetate)/bisphenol A/polyvinylpyrrolidone (PVAc/BPA/PVP) with different compositions have been prepared by solvent casting method and characterized by positron lifetime spectroscopy and differential scanning calorimetry DSC. Phase modifications have been induced by irradiating the blends with microwave radiation. These changes have been monitored by measuring the free-volume content in the blends. The results clearly show improved interactions between the constituent polymers of the blends upon microwave irradiation. However, the free-volume data and DSC measurements are found to be inadequate to reveal the changes at the interfaces and the interfaces determine the final properties of the blend. For this we have used hydrodynamic interaction (α ij ) approach developed by us to measure strength of hydrodynamic interaction at the interfaces. These results show that microwave irradiation stabilizes the interfaces if the blend contains strong polar groups. SAN/EVA/PVC blend shows an increased effective hydrodynamic interaction from −3.18 to −4.85 at composition 50/35/15 upon microwave irradiation and PVAc/BPA/PVP blend shows an increased effective hydrodynamic interaction from −3.81 to −7.57 at composition 20/50/30 after irradiation

  2. Microwave irradiation induced modifications on the interfaces in SAN/EVA/PVC and PVAc/BPA/PVP ternary polymer blends: Positron lifetime study

    Energy Technology Data Exchange (ETDEWEB)

    Dinesh, Meghala; Chikkakuntappa, Ranganathaiah, E-mail: crang1@rediffmail.com

    2013-09-01

    Ternary polymer blends of poly(styrene-co-acrylonitrile)/poly(ethylene-co-vinylacetate)/poly(vinyl chloride) (SAN/EVA/PVC) and poly(vinyl acetate)/bisphenol A/polyvinylpyrrolidone (PVAc/BPA/PVP) with different compositions have been prepared by solvent casting method and characterized by positron lifetime spectroscopy and differential scanning calorimetry DSC. Phase modifications have been induced by irradiating the blends with microwave radiation. These changes have been monitored by measuring the free-volume content in the blends. The results clearly show improved interactions between the constituent polymers of the blends upon microwave irradiation. However, the free-volume data and DSC measurements are found to be inadequate to reveal the changes at the interfaces and the interfaces determine the final properties of the blend. For this we have used hydrodynamic interaction (α{sub ij}) approach developed by us to measure strength of hydrodynamic interaction at the interfaces. These results show that microwave irradiation stabilizes the interfaces if the blend contains strong polar groups. SAN/EVA/PVC blend shows an increased effective hydrodynamic interaction from −3.18 to −4.85 at composition 50/35/15 upon microwave irradiation and PVAc/BPA/PVP blend shows an increased effective hydrodynamic interaction from −3.81 to −7.57 at composition 20/50/30 after irradiation.

  3. Acquiring energy savings in manufactured housing

    International Nuclear Information System (INIS)

    Davey, D.

    1993-01-01

    In 1991, the Northwest utilities faced a complex situation. They needed new sources of electrical power to avoid future deficits. A significant block of energy savings was available in the manufactured housing sector in the form of energy savings from increased insulation to new manufactured homes. The manufacturers were interested in saving the electricity in the homes, but would only deal with the utility sector as a whole. Half of the homes targeted were sited in investor-owned utility (IOU) service territories, and half in the public sector made up of utilities that purchased some or all of their electricity from the Bonneville Power Administration. Utilities agreed to acquire energy from manufacturers In the form of thermal efficiency measures specified by the Bonneville Power Administration. The program that resulted from over one year of negotiations was called the Manufactured Housing Acquisition Program, or MAP. Manufacturers, the utilities, State Energy Offices, the Northwest Power Planning Council and Bonneville all worked closely and with tenacity to build the program that went into effect on April 1, 1992, and should save the region between 7 and 9 megawatts, enough energy to supply 11,000 homes in the Northwest

  4. South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Grisak, Grant; Marotz, Brian

    2003-06-01

    In 1999, Montana Fish, Wildlife & Parks (MFWP) began a program aimed at conserving the genetically pure populations of westslope cutthroat trout in the South Fork Flathead River drainage. The objective of this program is to eliminate all of the exotic and hybrid trout that threaten the genetically pure westslope cutthroat populations in the South Fork Flathead. The exotic and hybrid trout populations occur in several headwater lakes and their outflow streams. In 2001 MFWP released a draft environmental assessment, pursuant to the Montana Environmental Policy Act (MEPA), that addressed the use of motorized equipment to deliver personnel and materials to some of these lakes in the Bob Marshall and Great Bear Wildernesses (Grisak 2001). After a 30-day public comment period, MFWP determined that the complexity of issues was too great and warranted a more detailed analysis. These issues included transportation options for personnel, equipment and materials, the use of motorized equipment in wilderness, fish removal methods, fish stocking, and the status and distribution of amphibian populations in the project area. Because the program also involves the U.S. Forest Service (USFS) and Bonneville Power Administration (BPA), the environmental analysis needs to comply with the National Environmental Policy Act (NEPA). In October 2001, pursuant to NEPA, MFWP, along with the USFS and BPA initiated an environmental assessment to address these issues. In June 2002, the three agencies determined that the scope of these issues warranted an Environmental Impact Statement. This specialist report describes the logistical, technical and biological issues associated with this project and provides an analysis of options for fish removal, transportation and fish stocking. It further analyzes issues and concerns associated with amphibian populations and creating new domesticated stocks of westslope cutthroat trout. Finally, this document provides a description of each lake, the best

  5. Shillapoo Wildlife Area, Annual Report 2007-2008.

    Energy Technology Data Exchange (ETDEWEB)

    Calkins, Brian

    2007-10-01

    This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 08 contract period October 1, 2007-September 30, 2008. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. Significant progress was realized in almost all major work types. Of particular note was progress made in tree plantings and pasture rehabilitation efforts. This year's tree planting effort included five sites detailed below and in terms of the number of plants was certainly the largest effort on the wildlife area to date in one season. The planting itself took a significant amount of time, which was anticipated. However, installation of mats and tubes took much longer than expected which impacted planned fence projects in particular. Survival of the plantings appears to be good. Improvement to the quality of waterfowl pasture habitats is evident on a number of sites due to replanting and weed control efforts. Continuing long-term weed control efforts will be key in improving this particular type of habitat. A prolonged cold, wet spring and a number of equipment breakdowns presented stumbling blocks that impacted schedules and ultimately progress on planned activities. The unusual spring weather delayed fieldwork on pasture planting projects as well as weed control and slowed the process of maintaining trees and shrubs. This time lag also caused the continued deferral of some of our fencing projects. The large brush hog mower had the driveline break twice and the smaller tractor had an engine failure that caused it to be down for over a month. We have modified our budget plan for next

  6. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  7. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  8. West Foster Creek 2007 Follow-up Habitat Evaluation Procedures (HEP) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-02-01

    A follow-up habitat evaluation procedures (HEP) analysis was conducted on the West Foster Creek (Smith acquisition) wildlife mitigation site in May 2007 to determine the number of additional habitat units to credit Bonneville Power Administration (BPA) for providing funds to enhance and maintain the project site as partial mitigation for habitat losses associated with construction of Grand Coulee Dam. The West Foster Creek 2007 follow-up HEP survey generated 2,981.96 habitat units (HU) or 1.51 HUs per acre for a 34% increase (+751.34 HUs) above baseline HU credit (the 1999 baseline HEP survey generated 2,230.62 habitat units or 1.13 HUs per acre). The 2007 follow-up HEP analysis yielded 1,380.26 sharp-tailed grouse (Tympanuchus phasianellus) habitat units, 879.40 mule deer (Odocoileus hemionus) HUs, and 722.29 western meadowlark (Sturnella neglecta) habitat units. Mule deer and sharp-tailed grouse habitat units increased by 346.42 HUs and 470.62 HUs respectively over baseline (1999) survey results due largely to cessation of livestock grazing and subsequent passive restoration. In contrast, the western meadowlark generated slightly fewer habitat units in 2007 (-67.31) than in 1999, because of increased shrub cover, which lowers habitat suitability for that species.

  9. Factors Affecting the Survival of Upstream Migrant Adult Salmonids in the Columbia River Basin : Recovery Issues for Threatened and Endangered Snake River Salmon : Technical Report 9 of 11.

    Energy Technology Data Exchange (ETDEWEB)

    Dauble, Dennis D.; Mueller, Robert P.

    1993-06-01

    The Bonneville Power Administration (BPA) is developing conservation planning documentation to support the National Marine Fisheries Service`s (NMFS) recovery plan for Columbia Basin salmonid stocks that are currently listed under the Endangered Species Act (ESA). Information from the conservation planning documentation will be used as a partial scientific basis for identifying alternative conservation strategies and to make recommendations toward conserving, rebuilding, and ultimately removing these salmon stocks from the list of endangered species. This report describes the adult upstream survival study, a synthesis of biological analyses related to conditions affecting the survival of adult upstream migrant salmonids in the Columbia River system. The objective of the adult upstream survival study was to analyze existing data related to increasing the survival of adult migrant salmonids returning to the Snake River system. The fate and accountability of each stock during its upstream migration period and the uncertainties associated with measurements of escapement and survival were evaluated. Operational measures that affected the survival of adult salmon were evaluated including existing conditions, augmented flows from upstream storage release, and drawdown of mainstem reservoirs. The potential impacts and benefits of these measures to each ESA stock were, also described based on considerations of species behavior and run timing.

  10. Monitoring of downstream salmon and steelhead at Federal hydroelectric facilities. Annual report 1993

    International Nuclear Information System (INIS)

    Wood, L.A.; Martinson, R.D.; Graves, R.J.; Carroll, D.R.; Killins, S.D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis

  11. Baselining PMU Data to Find Patterns and Anomalies

    Energy Technology Data Exchange (ETDEWEB)

    Amidan, Brett G.; Follum, James D.; Freeman, Kimberly A.; Dagle, Jeffery E.

    2016-10-25

    This paper looks at the application of situational awareness methodologies with respect to power grid data. These methodologies establish baselines that look for typical patterns and atypical behavior in the data. The objectives of the baselining analyses are to provide: real-time analytics, the capability to look at historical trends and events, and reliable predictions of the near future state of the grid. Multivariate algorithms were created to establish normal baseline behavior and then score each moment in time according to its variance from the baseline. Detailed multivariate analytical techniques are described in this paper that produced ways to identify typical patterns and atypical behavior. In this case, atypical behavior is behavior that is unenvisioned. Visualizations were also produced to help explain the behavior that was identified mathematically. Examples are shown to help describe how to read and interpret the analyses and visualizations. Preliminary work has been performed on PMU data sets from BPA (Bonneville Power Administration) and EI (Eastern Interconnect). Actual results are not fully shown here because of confidentiality issues. Comparisons between atypical events found mathematically and actual events showed that many of the actual events are also atypical events; however there are many atypical events that do not correlate to any actual events. Additional work needs to be done to help classify the atypical events into actual events, so that the importance of the events can be better understood.

  12. Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Lynn (Nez Perce Soil and Conservation District, Lewiston, ID)

    2006-07-01

    The ''Restoring Anadromous Fish Habitat in the Big Canyon Creek Watershed'' is a multi-phase project to enhance steelhead trout in the Big Canyon Creek watershed by improving salmonid spawning and rearing habitat. Habitat is limited by extreme high runoff events, low summer flows, high water temperatures, poor instream cover, spawning gravel siltation, and sediment, nutrient and bacteria loading. Funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council's Fish and Wildlife Program, the project assists in mitigating damage to steelhead runs caused by the Columbia River hydroelectric dams. The project is sponsored by the Nez Perce Soil and Water Conservation District. Target fish species include steelhead trout (Oncorhynchus mykiss). Steelhead trout within the Snake River Basin were listed in 1997 as threatened under the Endangered Species Act. Accomplishments for the contract period September 1, 2004 through October 31, 2005 include; 2.7 riparian miles treated, 3.0 wetland acres treated, 5,263.3 upland acres treated, 106.5 riparian acres treated, 76,285 general public reached, 3,000 students reached, 40 teachers reached, 18 maintenance plans completed, temperature data collected at 6 sites, 8 landowner applications received and processed, 14 land inventories completed, 58 habitat improvement project designs completed, 5 newsletters published, 6 habitat plans completed, 34 projects installed, 2 educational workshops, 6 displays, 1 television segment, 2 public service announcements, a noxious weed GIS coverage, and completion of NEPA, ESA, and cultural resources requirements.

  13. Annual coded wire tag program (Washington) missing production groups : annual report 2000; ANNUAL

    International Nuclear Information System (INIS)

    Dammers, Wolf; Mills, Robin D.

    2002-01-01

    The Bonneville Power Administration (BPA) funds the ''Annual Coded-wire Tag Program - Missing Production Groups for Columbia River Hatcheries'' project. The Washington Department of Fish and Wildlife (WDFW), Oregon Department of Fish and Wildlife (ODFW) and the United States Fish and Wildlife Service (USFWS) all operate salmon and steelhead rearing programs in the Columbia River basin. The intent of the funding is to coded-wire tag at least one production group of each species at each Columbia Basin hatchery to provide a holistic assessment of survival and catch distribution over time and to meet various measures of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. The WDFW project has three main objectives: (1) coded-wire tag at least one production group of each species at each Columbia Basin hatchery to enable evaluation of survival and catch distribution over time, (2) recover coded-wire tags from the snouts of fish tagged under objective 1 and estimate survival, contribution, and stray rates for each group, and (3) report the findings under objective 2 for all broods of chinook, and coho released from WDFW Columbia Basin hatcheries. Objective 1 for FY-00 was met with few modifications to the original FY-00 proposal. Under Objective 2, snouts containing coded-wire tags that were recovered during FY-00 were decoded. Under Objective 3, this report summarizes available recovery information through 2000 and includes detailed information for brood years 1989 to 1994 for chinook and 1995 to 1997 for coho

  14. 18 CFR 301.7 - Average System Cost methodology functionalization.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Average System Cost... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE SYSTEM COST METHODOLOGY FOR SALES FROM UTILITIES TO BONNEVILLE POWER ADMINISTRATION UNDER NORTHWEST POWER...

  15. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  16. Analysis about modeling MEC7000 excitation system of nuclear power unit

    Science.gov (United States)

    Liu, Guangshi; Sun, Zhiyuan; Dou, Qian; Liu, Mosi; Zhang, Yihui; Wang, Xiaoming

    2018-02-01

    Aiming at the importance of accurate modeling excitation system in stability calculation of nuclear power plant inland and lack of research in modeling MEC7000 excitation system,this paper summarize a general method to modeling and simulate MEC7000 excitation system. Among this method also solve the key issues of computing method of IO interface parameter and the conversion process of excitation system measured model to BPA simulation model. At last complete the simulation modeling of MEC7000 excitation system first time in domestic. By used No-load small disturbance check, demonstrates that the proposed model and algorithm is corrective and efficient.

  17. Institutional obligation

    International Nuclear Information System (INIS)

    Rowan, S.S.; Berwager, S.D.

    1988-01-01

    The institutional obligation is to act to meet primary responsibilities in the face of risks. There are risks involved in taking action, both of a quantifiable and unquantifiable nature. This paper explores weighing the risks, choosing approaches that balance primary obligations with broader ones, and presenting ethical philosophies upon which policies and strategies are based. Federal government organizations and utilities--and Bonneville Power Administration qualifies as both--have a variety of responsibilities to the public they serve. The common responsibility is that of service; for Bonneville the primary responsibility is to serve the energy related needs. It is this primary institutional obligation, as it relates to other responsibilities--and the resulting strategy for handling indoor air quality in Bonneville's new homes program--that this paper examines

  18. Hydrologic connections between environmental and societal change at the Bonneville Salt Flats, Utah

    Science.gov (United States)

    Bowen, B. B.; Harman, C. J.; Kipnis, E. L.; Liu, T.; Bernau, J. A.; Horel, J.

    2017-12-01

    The Bonneville Salt Flats (BSF) is an ephemeral and valued salt pan in northwestern Utah where a century of land speed racing and potash mining have created a complex and intertwined social and hydrologic system. The character of BSF changes on daily, weekly, monthly, annual, and geologic time scales in response to fluctuations in water balance, solute flux, and groundwater flow which is impacted by both local meteorology and water management associated with potash mining. In addition, the texture of the salt surface is changed by land use including racing activities, which impacts water fluxes through the crust. Ongoing research is focused on characterizing physical changes in the BSF environment and attributing observed changes in the landscape to specific processes and drivers. Five years of field observations and sampling, analyses of satellite imagery dating back the 1980s, and geochemical analysis of surface brines have shown that spatiotemporal changes in surface water and fluctuations in the surface salt footprint are linked to both climate and land use. Climate data over the last 30 years are examined to identify annual patterns in surface water balance at BSF to identify annual and seasonal climate constraints on flooding, evaporation, and desiccation cycles. A new weather station installed in the Fall of 2016 in the middle of BSF allows for unprecedented analyses of halite surface dynamics. Spatiotemporally dispersed stable isotope analyses of BSF surface brine samples constrain brine sources and evolution. An understanding of the processes that change the surface composition and texture through time inform interpretation of subsurface saline deposits at BSF. The wide range of temporal and spatial scales of observation help to guide to best management practices of this iconic natural resource.

  19. Sustainability at BPA 2012

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-12-01

    BPA’s Sustainability Action Plan is grounded in our commitment to environmental stewardship and Executive Order 13514 that calls on the federal agencies to “lead by example” by setting a 2020 greenhouse gas emissions target, increasing energy efficiency; reducing fleet petroleum consumption; conserving water; reducing waste; supporting sustainable communities; and leveraging federal purchasing power to promoting environmentally responsible products and technologies.

  20. Plastics derived endocrine disruptors (BPA, DEHP and DBP induce epigenetic transgenerational inheritance of obesity, reproductive disease and sperm epimutations.

    Directory of Open Access Journals (Sweden)

    Mohan Manikkam

    Full Text Available Environmental compounds are known to promote epigenetic transgenerational inheritance of adult onset disease in subsequent generations (F1-F3 following ancestral exposure during fetal gonadal sex determination. The current study was designed to determine if a mixture of plastic derived endocrine disruptor compounds bisphenol-A (BPA, bis(2-ethylhexylphthalate (DEHP and dibutyl phthalate (DBP at two different doses promoted epigenetic transgenerational inheritance of adult onset disease and associated DNA methylation epimutations in sperm. Gestating F0 generation females were exposed to either the "plastics" or "lower dose plastics" mixture during embryonic days 8 to 14 of gonadal sex determination and the incidence of adult onset disease was evaluated in F1 and F3 generation rats. There were significant increases in the incidence of total disease/abnormalities in F1 and F3 generation male and female animals from plastics lineages. Pubertal abnormalities, testis disease, obesity, and ovarian disease (primary ovarian insufficiency and polycystic ovaries were increased in the F3 generation animals. Kidney and prostate disease were only observed in the direct fetally exposed F1 generation plastic lineage animals. Analysis of the plastics lineage F3 generation sperm epigenome previously identified 197 differential DNA methylation regions (DMR in gene promoters, termed epimutations. A number of these transgenerational DMR form a unique direct connection gene network and have previously been shown to correlate with the pathologies identified. Observations demonstrate that a mixture of plastic derived compounds, BPA and phthalates, can promote epigenetic transgenerational inheritance of adult onset disease. The sperm DMR provide potential epigenetic biomarkers for transgenerational disease and/or ancestral environmental exposures.

  1. Bateria Psicológica para Avaliação da Atenção (BPA: desempenho de diferentes faixas etárias Batería Psicológica para Evaluación de la Atención (BPA: desempeño de distintos rangos etarios Psychological Battery for Attention Assessment (BPA: performance of different age groups

    Directory of Open Access Journals (Sweden)

    Fabián Javier Marín Rueda

    2013-04-01

    Full Text Available O objetivo do estudo foi analisar o desempenho atencional em diferentes momentos da vida. Participaram 1.759 pessoas, de ambos os sexos, e com idades variando de 6 até 82 anos. O instrumento utilizado foi a Bateria Psicológica para Avaliação da Atenção (BPA, composta pelos testes de Atenção Concentrada, Atenção Dividida e Atenção Alternada. Os resultados estão de acordo com o apontado pela literatura ao relacionar a atenção com as diferentes etapas do desenvolvimento. Nesse sentido, observou-se que houve um aumento de desempenho até o início da vida adulta, com um leve decréscimo a partir dos 30 anos, que fica mais evidente a partir dos 50 anos. Ainda, a ANOVA permitiu identificar seis faixas etárias que se diferenciaram claramente. Por fim, identificou-se que o desempenho em atenção dividida é inferior aos outros tipos de atenção. Sugerem-se novos estudos que permitam identificar e diferenciar um maior número de idades.El objetivo del estudio fue analizar la capacidad de atención en diferentes momentos de la vida. Participaron 1.759 personas, de ambos sexos, y con edades de 6 hasta 82 años. El instrumento utilizado fue la Batería Psicológica para Evaluación de la Atención (BPA, compuesta por los testes de Atención Concentrada, Atención Dividida y Atención Alternada. Los resultados están de acuerdo con lo mencionado por la literatura al relacionar la atención con las distintas etapas del desarrollo. En ese sentido, se observó que hubo un aumento en el desempeño hasta el inicio de la vida adulta, con una pequeña disminución a partir de los 30 años, que se queda más evidente a partir de los 50 años. Además, el ANOVA permitió identificar seis rangos etarios que se diferencian claramente. Finalmente, se identificó que el desempeño en atención dividida es inferior a los otros tipos de atención. Se sugieren nuevos estudios que permitan identificar y diferenciar un mayor número de edades.This study

  2. Risk Assessment Method of UHV AC/DC Power System under Serious Disasters

    Directory of Open Access Journals (Sweden)

    Rishang Long

    2016-12-01

    Full Text Available Based on the theory of risk assessment, the risk assessment method for an ultra-high voltage (UHV AC/DC hybrid power system under severe disaster is studied. Firstly, considering the whole process of cascading failure, a fast failure probability calculation method is proposed, and the whole process risk assessment model is established considering the loss of both fault stage and recovery stage based on Monte Carlo method and BPA software. Secondly, the comprehensive evaluation index system is proposed from the aspects of power system structure, fault state and economic loss, and the quantitative assessment of system risk is carried out by an entropy weight model. Finally, the risk assessment of two UHV planning schemes are carried out and compared, which proves the effectiveness of the research work.

  3. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  4. 18 CFR 301.5 - Changes in Average System Cost methodology.

    Science.gov (United States)

    2010-04-01

    ... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE... customers, or from three-quarters of Bonneville's direct-service industrial customers may initiate a...

  5. Process Document for the Conservation Competitive Bidding Pilot Program.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-09-01

    Bonneville Power Administration (Bonneville) is proposing to test competitive bidding for Conservation Resources to expand its existing resource acquisition capabilities. Competitive bidding may target specific types of electric end-uses or end-use sectors. It is a new acquisition approach through which Bonneville seeks to acquire resources that are not acquired through other existing or planned conservation programs. This proposal describes the conservation component of the all-source competitive acquisition approach that will be developed. It is expected that the combined resource acquisition effort will target about 100 average megawatts (aMW) as proposed in the 1990 Resource Program, although the exact amount has not yet been determined. Increasing the acquisition target will, to some extent, depend on whether the proposed pilot program is large enough to establish confidence in the approach.

  6. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  7. The BPA-substitute bisphenol S alters the transcription of genes related to endocrine, stress response and biotransformation pathways in the aquatic midge Chironomus riparius (Diptera, Chironomidae).

    Science.gov (United States)

    Herrero, Óscar; Aquilino, Mónica; Sánchez-Argüello, Paloma; Planelló, Rosario

    2018-01-01

    Bisphenol S (BPS) is an industrial alternative to the endocrine disruptor bisphenol A (BPA), and can be found in many products labeled "BPA-free". Its use has grown in recent years, and presently it is considered a ubiquitous emerging pollutant. To date there is a lack of information on the effects of BPS on invertebrates, although they represent more than 95% of known species in the animal kingdom and are crucial for the structure and proper function of ecosystems. In this study, real-time RT-PCR was used to determine the early detrimental effects of BPS on the transcriptional rate of genes in the model species Chironomus riparius, specifically those related to the ecdysone pathway (EcR, ERR, E74, Vtg, cyp18a1) crucial for insect development and metamorphosis, stress and biotransformation mechanisms (hsp70, hsp40, cyp4g, GPx, GSTd3) that regulate adaptive responses and determine survival, and ribosome biogenesis (its2, rpL4, rpL13) which is essential for protein synthesis and homeostasis. While 24-hour exposure to 0.5, 5, 50, and 500 μg/L BPS had no effect on larval survival, almost all the studied genes were upregulated following a non-monotonic dose-response curve. Genes with the greatest increases in transcriptional activity (fold change relative to control) were EcR (3.8), ERR (2), E74 (2.4), cyp18a1 (2.5), hsp70 (1.7), hsp40 (2.5), cyp4g (6.4), GPx (1.8), and GST (2.1), while others including Vtg, GAPDH, and selected ribosomal genes remained stable. We also measured the transcriptional activity of these genes 24 hours after BPS withdrawal and a general downregulation compared to controls was observed, though not significant in most cases. Our findings showed that BPS exposure altered the transcriptional profile of these genes, which may have consequences for the hormone system and several metabolic pathways. Although further research is needed to elucidate its mode of action, these results raise new concerns about the safety of BPA alternatives.

  8. Wildlife mitigation program final environmental impact statement

    International Nuclear Information System (INIS)

    1997-03-01

    BPA is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and improvement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative, i.e., not to establish program-wide standards. Five standardizing (action) alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information

  9. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  10. Development of a Natural Rearing System to Improve Supplemental Fish Quality, 1991-1995 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Maynard, Desmond J.; Flagg, Thomas A.; Mahnken, Conrad V.W.

    1996-08-01

    In this report, the National Marine Fisheries Service (NMFS), in collaboration with the Bonneville Power Administration (BPA), the Washington State Department of Fish and Wildlife (WDFW), and the US Fish and Wildlife Service (USFWS), presents research findings and guidelines for development and evaluation of innovative culture techniques to increase postrelease survival of hatchery fish. The Natural Rearing Enhancement System (NATURES) described in this report is a collection of experimental approaches designed to produce hatchery-reared chinook salmon (Oncorhynchus tshawytscha) that exhibit wild-like behavior, physiology, and morphology. The NATURES culture research for salmonids included multiple tests to develop techniques such as: raceways equipped with cover, structure, and natural substrates to promote development of proper body camouflage coloration; feed-delivery systems that condition fish to orient to the bottom rather than the surface of the rearing vessel; predator conditioning of fish to train them to avoid predators; and supplementing diets with natural live foods to improve foraging ability. The underlying assumptions are that NATURES will: (1) promote the development of natural cryptic coloration and antipredator behavior; (2) increase postrelease foraging efficiency; (3) improve fish health and condition by alleviating chronic, artificial rearing habitat-induced stress; and (4) reduce potential genetic selection pressures induced by the conventional salmon culture environment. A goal in using NATURES is to provide quality fish for rebuilding depleted natural runs.

  11. Eder Acquisition 2007 Habitat Evaluation Procedures Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-01-01

    A habitat evaluation procedures (HEP) analysis was conducted on the Eder acquisition in July 2007 to determine how many protection habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the project site as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. Baseline HEP surveys generated 3,857.64 habitat units or 1.16 HUs per acre. HEP surveys also served to document general habitat conditions. Survey results indicated that the herbaceous plant community lacked forbs species, which may be due to both livestock grazing and the late timing of the surveys. Moreover, the herbaceous plant community lacked structure based on lower than expected visual obstruction readings (VOR); likely a direct result of livestock impacts. In addition, introduced herbaceous vegetation including cultivated pasture grasses, e.g. crested wheatgrass and/or invader species such as cheatgrass and mustard, were present on most areas surveyed. The shrub element within the shrubsteppe cover type was generally a mosaic of moderate to dense shrubby areas interspersed with open grassland communities while the 'steppe' component was almost entirely devoid of shrubs. Riparian shrub and forest areas were somewhat stressed by livestock. Moreover, shrub and tree communities along the lower reaches of Nine Mile Creek suffered from lack of water due to the previous landowners 'piping' water out of the stream channel.

  12. Salmon River Habitat Enhancement, 1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, Mike

    1989-04-01

    This project was funded by the Bonneville Power Administration (BPA). The annual report contains three individual subproject papers detailing tribal fisheries work completed during the summer and fall of 1989. Subproject 1 contains summaries of evaluation/monitoring efforts associated with the Bear Valley Creek, Idaho enhancement project. Subproject 2 contains an evaluation of the Yankee Fork of the Salmon River habitat enhancement project. This report has been sub-divided into two parts: Part 1; stream evaluation and Part 2; pond series evaluation. Subproject 3 concerns the East Fork of the Salmon River, Idaho. This report summarizes the evaluation of the project to date including the 1989 pre-construction evaluation conducted within the East Fork drainage. Dredge mining has degraded spawning and rearing habitat for chinook salmon and steelhead trout in the Yankee Fork drainage of the Salmon River and in Bear Valley Creek. Mining, agricultural, and grazing practices degraded habitat in the East Fork of the Salmon River. Biological monitoring of the success of habitat enhancement for Bear Valley Creek and Yankee Fork are presented in this report. Physical and biological inventories prior to habitat enhancement in East Fork were also conducted. Four series of off-channel ponds of the Yankee Fork are shown to provide effective rearing habitat for chinook salmon. 45 refs., 49 figs., 24 tabs.

  13. Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement Summary.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho)

    1996-06-01

    This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe`s culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle.

  14. Nez Perce Tribal Hatchery Program: Draft environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1996-06-01

    This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe's culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle

  15. Annual coded wire tag program (Washington) missing production groups: annual report for 1997; ANNUAL

    International Nuclear Information System (INIS)

    Byrne, J.; Fuss, H.; Ashbrook, C.

    1998-01-01

    The Bonneville Power Administration (BPA) funds the ''Annual Coded Wire Tag Program - Missing Production Groups for Columbia River Hatcheries'' project. The Washington Department of Fish and Wildlife (WDFW), Oregon Department of Fish and Wildlife (ODFW) and the United States Fish and Wildlife Service (USFWS) all operate salmon and steelhead rearing programs in the Columbia River basin. The intent of the funding is to coded-wire tag at least one production group of each species at each Columbia Basin hatchery to provide a holistic assessment of survival and catch distribution over time and to meet various measures of the Northwest Power Planning Councils (NWPPC) Fish and Wildlife Program. The WDFW project has three main objectives: (1) coded-wire tag at least one production group of each species at each Columbia Basin hatchery to enable evaluation of survival and catch distribution over time, (2) recover coded-wire tags from the snouts of fish tagged under objective 1 and estimate survival, contribution, and stray rates for each group, and (3) report the findings under objective 2 for all broods of chinook, and coho released from WDFW Columbia Basin hatcheries. Objective 1 for FY-97 was met with few modifications to the original FY-97 proposal. Under Objective 2, snouts containing coded-wire tags that were recovered during FY-97 were decoded. Under Objective 3, survival, contribution and stray rate estimates for the 1991-96 broods of chinook and 1993-96 broods of coho have not been made because recovery data for 1996-97 fisheries and escapement are preliminary. This report summarizes recovery information through 1995

  16. 75 FR 70744 - Fiscal Year (FY) 2012-2013 Proposed Power Rate Adjustments Public Hearing and Opportunities for...

    Science.gov (United States)

    2010-11-18

    ... information about costs, load and resource forecasting, generation inputs pricing, segmentation, revenue... adopted the Market-Driven Alternative from the Business Plan EIS. This alternative was selected because, among other reasons, it allows BPA to: (1) Recover costs through rates; (2) competitively market BPA's...

  17. Enhanced heterogeneous photo-Fenton process modified by magnetite and EDDS: BPA degradation.

    Science.gov (United States)

    Huang, Wenyu; Luo, Mengqi; Wei, Chaoshuai; Wang, Yinghui; Hanna, Khalil; Mailhot, Gilles

    2017-04-01

    In this research, magnetite and ethylenediamine-N,N'-disuccinic acid (EDDS) are used in a heterogeneous photo-Fenton system in order to find a new way to remove organic contaminants from water. Influence of different parameters including magnetite dosage, EDDS concentration, H 2 O 2 concentration, and pH value were evaluated. The effect of different radical species including HO · and HO 2 · /O 2 ·- was investigated by addition of different scavengers into the system. The addition of EDDS improved the heterogeneous photo-Fenton degradation of bisphenol A (BPA) through the formation of photochemically efficient Fe-EDDS complex. This effect is dependent on the H 2 O 2 and EDDS concentrations and pH value. The high performance observed at pH 6.2 could be explained by the ability of O 2 ·- to generate Fe(II) from Fe(III) species reduction. GC-MS analysis suggested that the cleavage of the two benzene rings is the first degradation step followed by oxidation leading to the formation of the benzene derivatives. Then, the benzene ring was opened due to the attack of HO · radicals producing short-chain organic compounds of low molecular weight like glycerol and ethylene glycol. These findings regarding the capability of EDDS/magnetite system to promote heterogeneous photo-Fenton oxidation have important practical implications for water treatment technologies.

  18. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  19. The Pacific Northwest residential consumer: Perceptions and preferences of home heating fuels, major appliances, and appliance fuels

    Energy Technology Data Exchange (ETDEWEB)

    Harkreader, S.A.; Hattrup, M.P.

    1988-09-01

    In 1983 the Bonneville Power Administration contracted with the Pacific Northwest Laboratory (PNL) to conduct an analysis of the marketing environment for Bonneville's conservation activities. Since this baseline residential study, PNL has conducted two follow up market research projects: Phase 2 in 1985, and Phase 3, in 1988. In this report the respondents' perceptions, preferences, and fuel switching possibilities of fuels for home heating and major appliances are examined. To aid in effective target marketing, the report identifies market segments according to consumers' demographics, life-cycle, attitudes, and opinions.

  20. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2)

    Energy Technology Data Exchange (ETDEWEB)

    Barndt, Shawn L. [Bonneville Power Administration, Portland, OR (United States)

    2003-04-04

    Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways

  1. Evaluate the Restoration Potential of Snake River Fall Chinook Salmon Spawning Habitat, Status Report 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, T.P. [Pacific Northwest National Laboratory

    2009-01-08

    The Bonneville Power Administration (BPA) Project 2003-038-00, Evaluate the restoration potential of Snake River fall Chinook salmon spawning habitat, began in FY04 (15 December 2003) and continues into FY06. This status report is intended to summarize accomplishments during FY04 and FY05. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). This project evaluates the restoration potential of mainstem habitats for fall Chinook salmon. The studies address two research questions: 'Are there sections not currently used by spawning fall Chinook salmon within the impounded lower Snake River that possess the physical characteristics for potentially suitable fall Chinook spawning habitat?' and 'Can hydrosystem operations affecting these sections be adjusted such that the sections closely resemble the physical characteristics of current fall Chinook salmon spawning areas in similar physical settings?' Efforts are focused at two study sites: (1) the Ice Harbor Dam tailrace downstream to the Columbia River confluence, and (2) the Lower Granite Dam tailrace. Our previous studies indicated that these two areas have the highest potential for restoring Snake River fall Chinook salmon spawning habitat. The study sites will be evaluated under existing structural configurations at the dams (i.e., without partial removal of a dam structure), and alternative operational scenarios (e.g., varying forebay/tailwater elevations). The areas studied represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We are using a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats is the section extending downstream from the Wanapum Dam tailrace on the

  2. 1998 Pacific Northwest Loads and Resources Study: The White Book

    International Nuclear Information System (INIS)

    1998-01-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for inventory planning to determine BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The 1998 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1997 Pacific Northwest Loads and Resources Study

  3. 1998 Pacific Northwest Loads and Resources Study: The White Book.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for inventory planning to determine BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The 1998 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1997 Pacific Northwest Loads and Resources Study.

  4. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  5. 77 FR 26001 - Qualified Hydro 15, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-05-02

    ... have trash racks added. The existing 1,800-foot-long concrete-lined outlet tunnel would be lined with... Bonneville Power Administration Blue River substation; and (8) appurtenant facilities. The estimated annual...

  6. Plan estratégico agro industrial de calidad y ambiental, del sector pecuario de Córdoba, con base en las BPA, BPM y BPG

    OpenAIRE

    Estrada Toledo, Rosemberg de Jesús

    2014-01-01

    Artículo (Maestría en Desarrollo Sostenible y Medio Ambiente). Universidad de Manizales. Facultad de Ciencias Contables, Económicas y Administrativas, 2014 En esta investigación se tomó como referencia las actuales condiciones macroeconómicas del país y del departamento de Córdoba, proyectando una mayor adopción del uso en las Buenas Prácticas Agrícolas (BPA), Buenas Practicas Ganaderas (BPG) y Buenas Practicas Manufactureros (BPM) por parte del empresariado, sobre todo en la incorporaci...

  7. The BPA-substitute bisphenol S alters the transcription of genes related to endocrine, stress response and biotransformation pathways in the aquatic midge Chironomus riparius (Diptera, Chironomidae.

    Directory of Open Access Journals (Sweden)

    Óscar Herrero

    Full Text Available Bisphenol S (BPS is an industrial alternative to the endocrine disruptor bisphenol A (BPA, and can be found in many products labeled "BPA-free". Its use has grown in recent years, and presently it is considered a ubiquitous emerging pollutant. To date there is a lack of information on the effects of BPS on invertebrates, although they represent more than 95% of known species in the animal kingdom and are crucial for the structure and proper function of ecosystems. In this study, real-time RT-PCR was used to determine the early detrimental effects of BPS on the transcriptional rate of genes in the model species Chironomus riparius, specifically those related to the ecdysone pathway (EcR, ERR, E74, Vtg, cyp18a1 crucial for insect development and metamorphosis, stress and biotransformation mechanisms (hsp70, hsp40, cyp4g, GPx, GSTd3 that regulate adaptive responses and determine survival, and ribosome biogenesis (its2, rpL4, rpL13 which is essential for protein synthesis and homeostasis. While 24-hour exposure to 0.5, 5, 50, and 500 μg/L BPS had no effect on larval survival, almost all the studied genes were upregulated following a non-monotonic dose-response curve. Genes with the greatest increases in transcriptional activity (fold change relative to control were EcR (3.8, ERR (2, E74 (2.4, cyp18a1 (2.5, hsp70 (1.7, hsp40 (2.5, cyp4g (6.4, GPx (1.8, and GST (2.1, while others including Vtg, GAPDH, and selected ribosomal genes remained stable. We also measured the transcriptional activity of these genes 24 hours after BPS withdrawal and a general downregulation compared to controls was observed, though not significant in most cases. Our findings showed that BPS exposure altered the transcriptional profile of these genes, which may have consequences for the hormone system and several metabolic pathways. Although further research is needed to elucidate its mode of action, these results raise new concerns about the safety of BPA alternatives.

  8. Habitat Evaluation Procedures (HEP) Report : Rainwater Wildlife Area, 1998-2001 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2004-01-01

    The 8,768 acre Rainwater Wildlife Area was acquired in September 1998 by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through an agreement with Bonneville Power Administration (BPA) to partially offset habitat losses associated with construction of the John Day and McNary hydroelectric facilities on the mainstem Columbia River. U.S. Fish and Wildlife Service (USFWS) Habitat Evaluation Procedures (HEP) were used to determine the number of habitat units credited to BPA for acquired lands. Upland and riparian forest, upland and riparian shrub, and grassland rover types are evaluated in this study. Targeted wildlife species include downy woodpecker (Picoides pubescens), black-capped chickadee (Parus atricopillus), blue grouse (Dendragapus obscurus), great blue heron (Ardea herodias), yellow warbler (Dendroica petechia), mink (Mustela vison), and Western meadowlark (Sturnella neglects). Habitat surveys were conducted in 1998 and 1999 in accordance with published HEP protocols and included 65,300, 594m{sup 2} plots, and 112 one-tenth-acre plots. Between 153.3 and 7,187.46 acres were evaluated for each target wildlife mitigation species. Derived habitat suitability indices were multiplied by corresponding cover-type acreages to determine the number of habitat units for each species. The total baseline habitat units credited to BPA for the Rainwater Wildlife Area and its seven target species is 5,185.3 habitat units. Factors limiting habitat suitability are related to the direct, indirect, and cumulative effects of past livestock grazing, road construction, and timber harvest which have simplified the structure, composition, and diversity of native plant communities. Alternatives for protecting and improving habitat suitability include exclusion of livestock grazing, road de-commissioning/obliteration, reforestation and thinning, control of competing and unwanted vegetation (including noxious weeds), reestablishing displaced or reduced native

  9. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Friesen, Thomas A. (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-02-01

    Pacific salmon Oncorhynchus spp. populations have declined over the last century due to a variety of human impacts. Chum salmon O. keta populations in the Columbia River have remained severely depressed for the past several decades, while upriver bright (URB) fall Chinook salmon O. tschawytscha populations have maintained relatively healthy levels. For the past seven years we have collected data on adult spawning and juvenile emergence and outmigration of URB fall Chinook and chum salmon populations in the Ives and Pierce islands complex below Bonneville Dam. In 2004, we estimated 1,733 fall Chinook salmon and 336 chum salmon spawned in our study area. Fall Chinook salmon spawning peaked 19 November with 337 redds and chum salmon spawning peaked 3 December with 148 redds. Biological characteristics continue to suggest chum salmon in our study area are similar to nearby stocks in Hardy and Hamilton creeks, and Chinook salmon we observe are similar to upriver bright stocks. Temperature data indicated that 2004 brood URB fall Chinook salmon emergence began on 6 January and ended 27 May 2005, with peak emergence occurring 12 March. Chum salmon emergence began 4 February and continued through 2 May 2005, with peak emergence occurring on 21 March. Between 13 January and 28 June, we sampled 28,984 juvenile Chinook salmon and 1,909 juvenile chum salmon. We also released 32,642 fin-marked and coded-wire tagged juvenile fall Chinook salmon to assess survival. The peak catch of juvenile fall Chinook salmon occurred on 18 April. Our results suggested that the majority of fall Chinook salmon outmigrate during late May and early June, at 70-80 mm fork length (FL). The peak catch of juvenile chum salmon occurred 25 March. Juvenile chum salmon appeared to outmigrate at 40-55 mm FL. Outmigration of chum salmon peaked in March but extended into April and May.

  10. Evaluation of a Low-Cost Salmon Production Facility; 1988 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hill, James M.; Olson, Todd

    1989-05-01

    This fiscal year 1988 study sponsored by the Bonneville Power Administration evaluates an existing, small-scale salmon production facility operated and maintained by the Clatsop County Economic Development Committee's Fisheries Project.

  11. Columbia River Basin Seasonal Volumes and Statistics, 1928-1989. 1990 Level Modified Streamflows Computed Seasonal Volumes 61-Year Statistics.

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Crook Company

    1993-04-01

    This report was prepared by the A.G. Crook Company, under contract to Bonneville Power Administration, and provides statistics of seasonal volumes and streamflow for 28 selected sites in the Columbia River Basin.

  12. Open Access Transmission Tariff: Effective December 18, 1998 (Revised June 16, 1999).

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1999-06-16

    Bonneville will provide Network Integration Transmission Service pursuant to the terms and conditions contained in this Tariff and Service Agreement. The service that Bonneville will provide under this Tariff allows a Transmission Customer to integrate, economically dispatch and regulate its current and planned Network Resources to serve its Network Load. Network Integration Transmission Service also may be used by the Transmission Customer to deliver nonfirm energy purchases to its Network Load without additional charge. To the extent that the transmission path for moving power from a Network Resource to a Network Load includes the Eastern and Southern Interties, the terms and conditions for service over such intertie facilities are provided under Part 2 of this Tariff. Also, transmission service for third-party sales which are not designated as Network Load will be provided under Bonneville's Point-to-Point Transmission Service (Part 2 of this Tariff).

  13. Umatilla Basin Natural Production Monitoring and Evaluation; 1998-2002 Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-07-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME). Chapter One provides an overview of the entire report and shows how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. This chapter also provides background information relevant to the aquatic resources of the Umatilla River Basin. (Figure 1-1, Tables 1-1 and 1-2). Data and reports from this and previous efforts are available on the CTUIR website http://www.umatilla.nsn.us. This project was one of several subprojects of the Umatilla River Basin Fisheries Restoration Master Plan (CTUIR 1984, ODFW 1986) orchestrated to rehabilitate salmon and steelhead runs in the Umatilla River Basin. Subprojects in additions to this project include: Watershed Enhancement and Rehabilitation; Hatchery Construction and Operation; Hatchery Monitoring and Evaluation; Satellite Facility Construction and Operations for Juvenile Acclimation and Adult Holding and Spawning; Fish Passage Construction and Operation; Juvenile and Adult Passage Facility Evaluations; Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin, and Flow Augmentation to Increase Stream Flows below Irrigation Diversions.

  14. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME). Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.

  15. Historic Habitat Opportunities and Food-Web Linkages of Juvenile Salmon in the Columbia River Estuary, Annual Report of Research.

    Energy Technology Data Exchange (ETDEWEB)

    Bottom, Daniel L.; Simenstad, Charles A.; Campbell, Lance [Northwest Fisheries Science Center

    2009-05-15

    In 2002 with support from the U.S. Army Corps of Engineers (USACE), an interagency research team began investigating salmon life histories and habitat use in the lower Columbia River estuary to fill significant data gaps about the estuary's potential role in salmon decline and recovery . The Bonneville Power Administration (BPA) provided additional funding in 2004 to reconstruct historical changes in estuarine habitat opportunities and food web linkages of Columbia River salmon (Onchorhynchus spp.). Together these studies constitute the estuary's first comprehensive investigation of shallow-water habitats, including selected emergent, forested, and scrub-shrub wetlands. Among other findings, this research documented the importance of wetlands as nursery areas for juvenile salmon; quantified historical changes in the amounts and distributions of diverse habitat types in the lower estuary; documented estuarine residence times, ranging from weeks to months for many juvenile Chinook salmon (O. tshawytscha); and provided new evidence that contemporary salmonid food webs are supported disproportionately by wetland-derived prey resources. The results of these lower-estuary investigations also raised many new questions about habitat functions, historical habitat distributions, and salmon life histories in other areas of the Columbia River estuary that have not been adequately investigated. For example, quantitative estimates of historical habitat changes are available only for the lower 75 km of the estuary, although tidal influence extends 217 km upriver to Bonneville Dam. Because the otolith techniques used to reconstruct salmon life histories rely on detection of a chemical signature (strontium) for salt water, the estuarine residency information we have collected to date applies only to the lower 30 or 35 km of the estuary, where fish first encounter ocean water. We lack information about salmon habitat use, life histories, and growth within the long tidal

  16. Columbia River : Terminal Fisheries Research Report : Annual Report 1994.

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1996-12-01

    In 1993 the Northwest Power Planning Council recommended in its Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin.

  17. Water Quality - Monitoring the migrations of wild Snake River spring/summer Chinook salmon juveniles

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This is an ongoing Bonneville Power Administration funded project to annually collect, PIT tag, and release wild Chinook salmon parr in up to 17 streams of the...

  18. PIT Tag data - Monitoring the migrations of wild Snake River spring/summer Chinook salmon juveniles

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This is an ongoing Bonneville Power Administration funded project to annually collect, PIT tag, and release wild Chinook salmon parr in up to 17 streams of the...

  19. Development and Evaluation of Passive Integrated Transponder Tag Technology, 2000-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Downing, Sandra L.; Prentice, Earl F.; Nunnallee, Edmund P. [National Marine Fisheries Service

    2009-04-03

    Since 1984, the National Marine Fisheries Service (NMFS) in cooperation with the Bonneville Power Administration (BPA) has conducted a research project to develop and evaluate technology for passive-integrated-transponder tags (PIT tags) throughout the Columbia River Basin (CRB). Work conducted as part of this project between October 2000 and September 2002 (FY01 and FY02) was divided into seven individual elements, which are covered separately in this report. The efforts by personnel associated with this project have produced and will continue to produce products that aid resource stakeholders in assessing the effectiveness of actions taken to enhance the survival of juvenile and adult salmonids. These products and their uses include: (1) Survival and migration timing information on stocks to evaluate water management strategies and fish passage/collection facilities; (2) Data needed for the management and restoration of salmonids and other fish stocks listed under the Endangered Species Act (ESA); (3) Information required for the management of multiple species in a variety of habitats; and (4) Tools that enable fisheries researchers and managers to address previously unanswerable questions and critical uncertainties These products are also used in genetic, physiology, behavior, and captive broodstock research on endangered species. The continued development of PIT-tag technology will enable researchers and fisheries managers to address issues expressed in both of NMFS biological opinions for operation of the Federal Columbia River Power System (FCRPS)(NMFS 1995a, 2000) and the proposed Snake River Recovery Plan (NMFS 1995b; tasks 2.1.d, 2.3.b.4, 2.4.a, 2.6.c.2, and 2.9.d).

  20. Snake River Sockeye Salmon Habitat and Limnological Research; 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kohler, Andre E.; Taki, Doug (Shoshone-Bannock Tribes, Fort Hall, ID); Griswold, Robert G. (Biolines, Stanley, ID)

    2004-08-01

    In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list the Snake River sockeye salmon Oncorhynchus nerka as endangered. As a result of that petition the Snake River sockeye salmon was officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Program was implemented (Project Number 91-71, Intergovernmental Contract Number DE-BI79-91bp22548). This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of O. nerka. The Bonneville Power Administration (BPA) provides funding for this interagency recovery program through the Northwest Power Planning Council Fish and Wildlife Program (Council). Collaborators in the recovery effort include the National Marine Fisheries Service (NMFS), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), U.S. Forest Service (USFS), and the Shoshone-Bannock Tribe (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2001 calendar year. Project objectives include: (1) monitor over-winter survival and emigration of juvenile anadromous O. nerka stocked from the captive rearing program; (2) fertilize Redfish Lake, fertilization of Pettit and Alturas lakes was suspended for this year; (3) conduct kokanee (non-anadromous O. nerka) population surveys; (4) monitor spawning kokanee escapement and estimate fry recruitment on Fishhook, Alturas Lake, and Stanley Lake creeks; (5) evaluate potential competition and predation interactions between stocked juvenile O. nerka and a variety of fish species in Redfish, Pettit, and Alturas lakes; (6) monitor limnological parameters of Sawtooth Valley lakes to assess lake productivity.

  1. Assessment of Salmonids and their Habitat Conditions in the Walla Walla River Basin of Washington : 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mendel, Glen Wesley; Karl, David; Coyle, Terrence

    2001-11-01

    Concerns about the decline of native salmon and trout populations have increased among natural resource managers and the public in recent years. As a result, a multitude of initiatives have been implemented at the local, state, and federal government levels. These initiatives include management plans and actions intended to protect and restore salmonid fishes and their habitats. In 1998 bull trout were listed under the Endangered Species Act (ESA), as ''Threatened'', for the Walla Walla River and its tributaries. Steelhead were listed as ''Threatened'' in 1999 for the mid-Columbia River and its tributaries. These ESA listings emphasize the need for information about the threatened salmonid populations and their habitats. The Washington Department of Fish and Wildlife (WDFW) is entrusted with ''the preservation, protection, and perpetuation of fish and wildlife....[and to] maximize public recreational or commercial opportunities without impairing the supply of fish and wildlife (WAC 77. 12.010).'' In consideration of this mandate, the WDFW submitted a proposal in December 1997 to the Bonneville Power Administration (BPA) for a study to assess salmonid distribution, relative abundance, genetics, and the condition of their habitats in the Walla Walla River basin. The primary purposes of this project are to collect baseline biological and habitat data, to identify major data gaps, and to draw conclusions whenever possible. The study reported herein details the findings of the 2000 field season (March to November, 2000).

  2. Assessment of salmonids and their habitat conditions in the Walla Walla River Basin of Washington : 2000 annual report; ANNUAL

    International Nuclear Information System (INIS)

    Mendel, Glen Wesley; Karl, David; Coyle, Terrence

    2001-01-01

    Concerns about the decline of native salmon and trout populations have increased among natural resource managers and the public in recent years. As a result, a multitude of initiatives have been implemented at the local, state, and federal government levels. These initiatives include management plans and actions intended to protect and restore salmonid fishes and their habitats. In 1998 bull trout were listed under the Endangered Species Act (ESA), as ''Threatened'', for the Walla Walla River and its tributaries. Steelhead were listed as ''Threatened'' in 1999 for the mid-Columbia River and its tributaries. These ESA listings emphasize the need for information about the threatened salmonid populations and their habitats. The Washington Department of Fish and Wildlife (WDFW) is entrusted with ''the preservation, protection, and perpetuation of fish and wildlife....[and to] maximize public recreational or commercial opportunities without impairing the supply of fish and wildlife (WAC 77.12.010).'' In consideration of this mandate, the WDFW submitted a proposal in December 1997 to the Bonneville Power Administration (BPA) for a study to assess salmonid distribution, relative abundance, genetics, and the condition of their habitats in the Walla Walla River basin. The primary purposes of this project are to collect baseline biological and habitat data, to identify major data gaps, and to draw conclusions whenever possible. The study reported herein details the findings of the 2000 field season (March to November, 2000)

  3. Performance of ultrasonic and hydrogen peroxide technologies in removal of Bisphenol A from Aqueous solution

    Directory of Open Access Journals (Sweden)

    MH Dehghani

    2016-05-01

    Full Text Available Introduction:BPA is a non biodegradable antioxidant that has greatly hazardous for human and animals health. and Because of the eliminating alone fewness amount of the BPA during the wastewater treatment, wastewater that contains BPA can be source of pollution in aqueous solution. The objective of this study was Performance of ultrasonic and H2O2 technologies in removal of BPA from aqueous solution. Methods:Experiments of sonochemical was carried out with use of unit ultrasonicator (Elma, which in the two power 300 and 500W, frequencies at 35 and 130KHz. Hydrogen Peroxide in concentrations at 5, 15 and 30mg/lit was applied. Initial concentration BPA at limits 2, 5, 20 and 50 mg/lit which For measuring concentration of BPA used from Spectrometer UV/VIS Lambada 25 Perkin Elmer, Shelton unit. Results:The results demonstrated that hybrid ultrasonic and peroxide Hydrogen processes with Efficiency 98.65%,  has the highest efficiency in the removal of BPA. The most decomposition rate achieved at the frequency of 130 KHz and 500W assisted by 30mg/lit H2O2 at pH 11. Also the results demonstrated that with pH increase destruction rate BPA the increased by any three processes (ultrasonic, H2O2 and both hybrid. Conclusion:The results demonstrated that hybrid ultrasonic and peroxide Hydrogen processes can be used as a clean method and friendly environment for waters treatment are contains desirable BPA.

  4. 77 FR 50979 - Northwest Forest Plan Provincial Advisory Committees

    Science.gov (United States)

    2012-08-23

    ... Division, Bonneville Power Administration, Department of Defense, and Natural Resources Conservation... community. The PACs may invite a representative of the State Community Economic [[Page 50980..., individuals with demonstrated ability to represent minorities, women, and persons with disabilities. Dated...

  5. 76 FR 59394 - Big Eddy-Knight Transmission Project

    Science.gov (United States)

    2011-09-26

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Big Eddy-Knight Transmission Project AGENCY... Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. Construction of the Big Eddy-Knight Transmission Project will accommodate long-term firm transmission requests...

  6. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  7. Coeur d'Alene Tribe Fish, Water and Wildlife Program : Coeur d'Alene Tribe Trout Production Facility Master Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Peters, Ronald L.; Woodward-Lilengreen, Kelly L.; Vitale, Angelo J.

    1999-09-01

    The Northwest Power Planning Council (Council) receives and reviews proposals to mitigate for fish and wildlife losses and refers approved measures to Bonneville Power Administration (BPA) for funding. The Northwest Power Act (Act) calls on the Council to include measures in its Columbia River Basin Fish and Wildlife Program (Program) to address system-wide fish and wildlife losses. The Act further states that the Council may include in its Program measures that provide off-site mitigation--mitigation physically removed from the hydro project(s) that caused the need to mitigate. The Program includes a goal ''to recover and preserve the health of native resident fish injured by the hydropower system, where feasible, and, where appropriate, to use resident fish to mitigate for anadromous fish losses in the system.'' Among those recommended measures are off-site mitigation for losses of anadromous fisheries including the measure under analysis in this Coeur d'Alene Tribe Trout Production Facility Master Plan, proposed by the Coeur d'Alene Tribe. To meet the need for off-site mitigation for anadromous fish losses in the Columbia River Basin in a manner consistent with the objectives of the Council's Fish and Wildlife Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operations and maintenance of a trout production facility on the Coeur d'Alene Indian Reservation. Measures for establishing a Coeur d'Alene fish production facility have been a part of the Council's Program since 1987. The Coeur d'Alene Tribe Trout Production Facility is intended to rear and release westslope cutthroat trout into rivers and streams with the express purpose of increasing the numbers of fish spawning, incubating and rearing in the natural environment. It will use the modern technology that hatcheries offer to overcome the mortality resulting from habitat degradation in lakes, rivers, and

  8. Photocatalytic Degradation of Bisphenol A from Aqueous Solutions using TiO2 Nanoparticles and UV Illumination

    Directory of Open Access Journals (Sweden)

    Ramzan ali Dianati

    2014-12-01

    Full Text Available Background and Purpose: Bisphenol A (BPA is used to make certain plastics and epoxy resins. It is a non-biodegradable compound, and poses health risks to both humans and animals. The purpose of this study was to evaluate decomposition efficiency of BPA from aqueous solutions using UV irradiation. Materials and Methods: In this study, the photodegradation of BPA in water were carried out in a reactor equipped 6 W UV lamp. In order to obtain the optimum operational conditions, parameters such as BPA concentration (1-50 mg/l, TiO2 dosage (0.025-2 g/l, and pH (3-11 were evaluated. BPA concentration was measured by high-performance liquid chromatography. Results: The highest degradation was 90% and achieved in 60 min. BPA degradation efficiency can be effectively improved by increasing pH, decreasing the initial concentration and increasing TiO2 dosage. The optimal dose of TiO2 was measured at 0.5 g/l. The degradation decreases with increasing TiO2 dosage. Conclusion: Photocatalytic degradation by using TiO2 and low power UV lamp is applicable.

  9. The hamster cheek pouch (HCP) as an experimental model of oral cancer for BNCT: biodistribution and pharmacokinetics of BPA

    International Nuclear Information System (INIS)

    Kreimann, E.; Itoiz, M.E.; Dagrosa, A.; Garavaglia, R.; Farias, S.; Batistoni, D.; Schwint, A.E.

    2000-01-01

    We propose and validate the HCP model of oral cancer for BNCT studies. This model serves to explore new applications of the technique, study the biology of BNCT and assess Boron uptake in clinically relevant oral tissues. Tumors are induced by a process that mimics spontaneous malignant transformation instead of by the growth of implanted tumor cells. Syrian hamsters were submitted to tumor induction with a chemical carcinogenesis protocol and then used for biodistribution and pharmacokinetic studies of BPA. The data reveal selective uptake by tumor and, to a lesser degree, by precancerous tissue. Boron concentration in oral tissues and skin was higher than in blood, an issue of clinical relevance given that these tissues may be dose-limiting. Absolute and relative values of Boron concentration would be potentially therapeutic. Boron concentration exhibited a linear relationship with percentage of viable tissue in HCP tumors. The HCP model would provide a novel, contributory approach to BNCT research. (author)

  10. The 1992 Pacific Northwest Residential Energy Survey: Phase 1 : Book 1 : Getting Started.

    Energy Technology Data Exchange (ETDEWEB)

    Applied Management & Planning Group (firm); United States. Bonneville Power Administration. End-Use Research Section.

    1993-08-01

    This Executive Summary outlines the general processes employed in and the major findings from the conduct of Phase I of the Pacific Northwest Residential Energy Survey (PNWRES92-I) during the last quarter of 1992. This study was Bonneville`s third comprehensive residential survey of the region, conducted to provide data on energy usage, conservation awareness and behaviors, and associated consumer characteristics for use in forecasting and planning. The summary is divided into four sections: Background sets the stage with respect to the need for the survey, relates it to previous work, outlines the implementation processes, and summarizes the data products. Profiling the respondents summarizes the survey results under these six categories: Demographics; Housing Units; Room Inventory; Appliance Inventory; Air-Conditioning/Heating; Water-Heating; and Opinion. Reports and cross-tabulations describes the various individual documents. Bonneville Power Plus provides a short description of an Excel-spreadsheet-based software program that contains all of the tabulated material in a format that encourages browsing among the tables and charts, with special feature that they can be copied directly into other Windows-based documents.

  11. Plasticizers and BPA Residues in Tunisian and Italian Culinary Herbs and Spices.

    Science.gov (United States)

    Di Bella, Giuseppa; Ben Mansour, Hedi; Ben Tekaya, Asma; Beltifa, Asma; Potortì, Angela Giorgia; Saiya, Emanuele; Bartolomeo, Giovanni; Dugo, Giacomo; Lo Turco, Vincenzo

    2018-06-01

    In the present study, 18 plasticizers and residues in 10 different Tunisian and Italian culinary herbs and spices (black pepper, mint, caraway, coriander, oregano, rosemary, thyme, fennel, verbena, and laurel) were determined by GC/MS. Di-methylphthalate, di-(2-methylpropyl)adipate, di-n-butyladipate, di-propylphthalate, benzylbenzoate, di-phenylphthalate, and bisphenol A were lower than their LOQ in all 118 samples. Among the Tunisian samples, di-(2-ethylhexyl)phthalate was found in all types of samples and di-butylphthalate in 50% of types; all other phthalates were rarely dectected. Among the adipates, only di-methyladipate was found in 90% of types; di-ethyladipate was seldom found and di-(2-ethylhexyl)adipate only in samples of caraway. Di-(2-ethylhexyl)terephthalate was found in all types of samples; di-(2-ethylhexyl)sebacate was detected rarely but with high values. Among the Sicilian samples, di-ethylphthalate and di-(2-methylpropyl)phthalate were detected only in samples of mint; di-methyladipate, di-butylphthalate, and benzylbutylphthalate were identified in oregano and laurel; di-(2-ethylhexyl)terephthalate and di-(2-ethylhexyl)sebacate only in oregano. In any case, the results suggested that intake of these contaminants through spices and herbs is not a dangerous risk to the consumers. Probably, as already observed for the other food, these contaminants could result from pollution of the environment (air, water, and/or soil) and/or farming methods. Plasticizers and BPA in Tunisian and Italian spices were determined by GC/MS. Tunisian spices seem to contain more residues than Italian samples. Intake of these contaminants by spices is not a dangerous risk to the consumers. These pollutants could result from environmental pollution or agricultural practices. © 2018 Institute of Food Technologists®.

  12. Monte Carlo simulations of radioactive waste encapsulated by bisphenol-A polycarbonate and effect of bismuth-III oxide filler material

    International Nuclear Information System (INIS)

    Özdemir, Tonguç

    2017-01-01

    Radioactive waste generated from the nuclear industry and non-power applications should carefully be treated, conditioned and disposed according to the regulations set by the competent authority(ies). Bisphenol-a polycarbonate (BPA-PC), a very widely used polymer, might be considered as a potential candidate material for low level radioactive waste encapsulation. In this work, the dose rate distribution in the radioactive waste drum (containing radioactive waste and the BPA-PC polymer matrix) was determined using Monte Carlo simulations. Moreover, the change of mechanical properties of BPA-PC was estimated and their variation within the waste drum was determined for the periods of 15, 30 and 300 years after disposal to the final disposal site. The change of the dose rate within the waste drum with different contents of bismuth-III oxide were also simulated. It was concluded that addition of bismuth-III oxide filler decreases the dose delivered to the polymeric matrix due to photoelectric effect. - Highlights: • Bisphenol-a polycarbonate (BPA-PC) is a widely used polymeric material and have a considerable gamma radiation stability. • BPA-PC could have a potential candidate material for radioactive waste embedding. • Activity of the radioactive waste that could be embedded into the BPA-PC matrix was simulated. • Effect of bismuth-III-oxide filler to the BPA-PC matrix was determined.

  13. An Annotated Bibliography of HVDC Transmission and FACTS Devices, 1996-1997.

    Energy Technology Data Exchange (ETDEWEB)

    Litzenberger, Wayne H.; Varma, Rajiv K.; Flanagan, John D. [eds.

    1998-06-01

    This edition of the Annotated Bibliography of HVDC Transmission and FACTS Devices continues work begun in 1962 by the late Erik Bromberg, Bonneville Power Administration Librarian. His original bibliography covered the period 1932--1962. Subsequent editions were compiled by Bromberg, Val S. Lava, and Wayne Litzenberger, all of Bonneville Power Administration. Beginning with the 1991--1993 edition, the scope of the bibliography was expanded to include flexible ac transmission (FACTS) devices. This 1996--1997 edition also contains information for 1998. Preparation of the present edition took place primarily in May-June of 1998. All pertinent references have been included that were available to the editors at the time of preparation. Papers for the 1998 IEEE Winter and Summer Power Meetings and 1998 T and D Conference have been included. This edition contains the organizational affiliation of the first-named author as an aid to accessing the reference. Unfortunately, space limitations prevented the inclusion of the affiliations of all authors. Some minor editorial changes have been made to abstracts to ensure consistency in style and syntax.

  14. 2008 NWFSC Tidal Freshwater Genetics Results

    Energy Technology Data Exchange (ETDEWEB)

    David Teel

    2009-05-01

    Genetic Analysis of Juvenile Chinook Salmon for inclusion in 'Ecology of Juvenile Salmon in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta, Lower Columbia River, 2008. Annual Report to Bonneville Power Administration, Contract DE-AC05-76RL01830.'

  15. 76 FR 36532 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Science.gov (United States)

    2011-06-22

    ... Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind...), Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC (Complainants) filed a formal complaint against Bonneville Power Administration...

  16. 77 FR 2286 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-44-000] Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind Energy LLC v. Bonneville Power Administration; Notice of Designation of Certain Commission Personnel as...

  17. 2012 White Book, Pacific Northwest Loads and Resources Study

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-06

    The White Book is a planning analysis produced by BPA that informs BPA of its load and resource conditions for sales and purchases. The White Book provides a 10-year look at the expected obligations and resources in the Federal system and PNW region. The White Book is used as a planning tool for the Columbia River Treaty (Treaty) studies, as an information tool for customers and regional interests, and as a publication of information utilized by other planning entities for their analyses. The White Book is not used to guide day-to-day operations of the Federal Columbia River Power System (FCRPS) or determine BPA revenues or rates.

  18. Western GeoPower Corp. brochure : nature's own clean, renewable energy

    International Nuclear Information System (INIS)

    2004-10-01

    This brochure describes the most advanced geothermal project in Canada. British Columbia's Western GeoPower Corporation holds Canada's only geothermal lease issued for commercial production of electricity. The company's South Meager Geothermal Project is expected to bring 100 MW of generating capacity on stream in 2007 and an additional 100 MW in 2009. The project has a maximum potential of 250 MW. Geothermal energy was described as being the heat radiating from the Earth's molten core that can be harnessed to produce electricity, steam and hot water for industrial, commercial and residential use. This brochure explained how geothermal energy is created, where it is found, and its importance in the global energy scene. Potential geothermal power capacity is estimated to be 50,000 times the energy of all known petroleum reserves. Most countries of the Pacific Rim have developed geothermal resources to produce electricity. Iceland produces 80 per cent of its power requirements from geothermal energy. The cost of generating electricity from geothermal resources has been reduced by 25 per cent in the past decade due to technological advances. In addition, geothermal power plants receive incentives and premium prices related to their capacity. Geothermal power plants are extremely reliable and have a 95 per cent load capacity utilization. The thermal reservoir defined at South Meager has an areal extent of 4.5 to 7.5 square km and a thickness of 2,800 metres. This high temperature field located near Whistler, British Columbia is a major geothermal site with enough electricity for a city of about 500,000 people. The project is located near the province's main electricity grid which provides a direct link with the Bonneville Power Authority grid in the northwestern United States. The three phases of the South Meager Geothermal Project are: (1) resource confirmation in 2004-2005, (2) feasibility study, permitting and financing in 2005, and (3) project design and

  19. Snake River sockeye salmon habitat and limnological research, annual report 1999

    International Nuclear Information System (INIS)

    Griswold, Robert G.

    2001-01-01

    In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list the Snake River sockeye salmon (Oncorhynchus nerka) as endangered. As a result of that petition the Snake River sockeye salmon was officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991 the Snake River Sockeye Salmon Habitat and Limnological Research Program was implemented (Project Number 91-71, Intergovernmental Contract Number DE-BI79-91bp22548). This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of O. nerka. The Bonneville Power Administration (BPA) provides funding for this inter-agency recovery program through the Northwest Power Planning Council Fish and Wildlife Program (NPPCFWP). Collaborators in the recovery effort include the National Marine Fisheries Service (NMFS), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), U.S. Forest Service (USFS), and the Shoshone-Bannock Tribe (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 1999 calendar year. Project objectives include: (1) monitor over-winter survival and emigration of juvenile anadromous O. nerka stocked from the captive rearing program; (2) fertilize Pettit, and Alturas lakes, fertilization of Redfish Lake was suspended for this year; (3) conduct kokanee (nonanadromous O. nerka) population surveys; (4) monitor spawning kokanee escapement and estimate fry recruitment on Fishhook, Alturas Lake, and Stanley Lake creeks; (5) evaluate potential competition and predation interactions between stocked juvenile O. nerka and a variety of fish species in Redfish, Pettit, and Alturas lakes; (6) examine diet of emigrating O. nerka smolts; (7) monitor limnological parameters of Sawtooth Valley lakes to assess lake productivity

  20. Transition report, United States Department of Energy: A report to the President-Elect. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy transition issues. The topics of the report include: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Defense Programs; New Production Reactors; Economic Regulatory Administration; Energy Information Administration; energy research; environment, safety and health; fossil energy; General Counsel; hearings and appeals, Inspector General, international affairs and energy emergencies; management and administration, minority economic impact; nuclear energy; policy, planning and analysis, radioactive waste management; and power marketing administrations: Bonneville Power Administration, Western Area Power Administration, Alaska Power Administration, Southeastern Power Administration, and Southwestern Power Administration.