WorldWideScience

Sample records for booster ramping power

  1. High power fast ramping power supplies

    Energy Technology Data Exchange (ETDEWEB)

    Marneris,I.; Bajon, E.; Bonati, R.; Sandberg, J.; Roser, T.; Tsoupas, N.

    2009-05-04

    Hundred megawatt level fast ramping power converters to drive proton and heavy ion machines are under research and development at accelerator facilities in the world. This is a leading edge technology. There are several topologies to achieve this power level. Their advantages and related issues will be discussed.

  2. Detecting and characterising ramp events in wind power time series

    International Nuclear Information System (INIS)

    Gallego, Cristóbal; Cuerva, Álvaro; Costa, Alexandre

    2014-01-01

    In order to implement accurate models for wind power ramp forecasting, ramps need to be previously characterised. This issue has been typically addressed by performing binary ramp/non-ramp classifications based on ad-hoc assessed thresholds. However, recent works question this approach. This paper presents the ramp function, an innovative wavelet- based tool which detects and characterises ramp events in wind power time series. The underlying idea is to assess a continuous index related to the ramp intensity at each time step, which is obtained by considering large power output gradients evaluated under different time scales (up to typical ramp durations). The ramp function overcomes some of the drawbacks shown by the aforementioned binary classification and permits forecasters to easily reveal specific features of the ramp behaviour observed at a wind farm. As an example, the daily profile of the ramp-up and ramp-down intensities are obtained for the case of a wind farm located in Spain

  3. Power Supply of the Booster Magnets for the ILSF Synchrotron

    Directory of Open Access Journals (Sweden)

    O Ahmadi

    2017-08-01

    Full Text Available The Iranian Light Source Facility (ILSF booster main specifications including 250 ms ramp up, 2Hz repetition rate, and quasi-sinusoidal wave shape, up to this point have been the basis for calculations. Each family of magnets including Dipole, Quadrupole and Sextupoles will feed by individual power supply. In order to maintain constant transverse tunes and chromaticity while the beam is accelerated, quadrupole and sextupole magnet currents must closely track the current in the dipole magnets. In booster rings, feeding the high inductance load, tracking of Quadrupole and sextupole magnets, reducing output current fluctuation and having a precise high bandwidth current regulation system are particular challenges. In order to meet the requirements, it is necessary to have a fully digital controller to achieve a fast regulation system. The prototype power supply and its test results are described in this paper  

  4. A survey on wind power ramp forecasting.

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, C.; Gama, J.; Matias, L.; Botterud, A.; Wang, J. (Decision and Information Sciences); (INESC Porto)

    2011-02-23

    The increasing use of wind power as a source of electricity poses new challenges with regard to both power production and load balance in the electricity grid. This new source of energy is volatile and highly variable. The only way to integrate such power into the grid is to develop reliable and accurate wind power forecasting systems. Electricity generated from wind power can be highly variable at several different timescales: sub-hourly, hourly, daily, and seasonally. Wind energy, like other electricity sources, must be scheduled. Although wind power forecasting methods are used, the ability to predict wind plant output remains relatively low for short-term operation. Because instantaneous electrical generation and consumption must remain in balance to maintain grid stability, wind power's variability can present substantial challenges when large amounts of wind power are incorporated into a grid system. A critical issue is ramp events, which are sudden and large changes (increases or decreases) in wind power. This report presents an overview of current ramp definitions and state-of-the-art approaches in ramp event forecasting.

  5. Nuclear and thermal power plant power ramping capability

    International Nuclear Information System (INIS)

    Golovach, E.A.

    1983-01-01

    The possibilities of step power increase by NPP and TPP units under emergency conditions of power grids operation are considered. The data analysis has shown that power units ramping capability with WWER-440, WWER-1000 and RBMK-1000 reactors is higher than that of 300 MW power units on fossil fuel, at the initial time interval (0-30 s). These NPP power units satisfy as to ramping capability the energy system requirements. Higher NPP power units ramping capability is explained by the fact that relative pressure before turbine valves is decreased less than in straight-through boilers while the steam volumes time constant of steam separator-superheaters is less than that of intermediate superheatings. Higher power unit ramping capability with WWER-440 and RBMK-1000 reactors as compared with the WWER-1000 reactor is pointed out as well as the increase of WWER-1000 power unit capability using high-speed turbines

  6. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  7. Prediction of power-ramp defects in CANDU fuel

    International Nuclear Information System (INIS)

    Gillespie, P.; Wadsworth, S.; Daniels, T.

    2010-01-01

    Power ramps result in fuel pellet expansion and can lead to fuel sheath failures by fission product induced stress corrosion cracking (SCC). Historically, empirical models fit to experimental test data were used to predict the onset of power-ramp failures in CANDU fuel. In 1988, a power-ramped fuel defect event at PNGS-1 led to the refinement of these empirical models. This defect event has recently been re-analyzed and the empirical model updated. The empirical model is supported by a physically based model which can be used to extrapolate to fuel conditions (density, burnup) outside of the 1988 data set. (author)

  8. A criterion and mechanism for power ramp defects

    International Nuclear Information System (INIS)

    Garlick, A.; Gravenor, J.G.

    1978-02-01

    The problem of power ramp defects in water reactor fuel pins is discussed in relation to results recently obtained from ramp experiments in the Steam Generating Heavy Water Reactor. Cladding cracks in the defected fuel pins were similar, both macro- and micro structurally, to those in unirradiated Zircaloy exposed to iodine stress-corrosion cracking (scc) conditions. Furthermore, when the measured stress levels for scc in short-term tests were taken as a criterion for ramp defects, UK fuel modelling codes were found to give a useful indication of defect probability under reactor service conditions. The likelihood of sticking between fuel and cladding is discussed and evidence presented which suggests that even at power a degree of adhesion may be expected in some fuel pins. The ramp defect mechanism is discussed in terms of fission product scc, initiation being by intergranular penetration and propagation by cleavage when suitably orientated grains are exposed to large dilatational stresses ahead of the main crack. (author)

  9. Power ramp tests of BWR-MOX fuels

    International Nuclear Information System (INIS)

    Asahi, K.; Oguma, M.; Higuchi, S.; Kamimua, K.; Shirai, Y.; Bodart, S.; Mertens, L.

    1996-01-01

    Power ramp test of BWR-MOX and UO 2 fuel rods base irradiated up to about 60 GWd/t in Dodewaard reactor have been conducted in BR2 reactor in the framework of the international DOMO programme. The MOX pellets were provided by BN (MIMAS process) and PNC (MH method). The MOX fuel rods with Zr-liner and non-liner cladding and the UO 2 fuel rods with Zr-liner cladding remained intact during the stepwise power ramp tests to about 600 W/cm, even at about 60 GWd/t

  10. Power ramp performance of some 15 x 15 PWR test fuel rods tested in the STUDSVIK SUPER-RAMP and SUPER-RAMP extension projects

    International Nuclear Information System (INIS)

    Djurle, S.

    2000-01-01

    This paper presents results obtained from the STUDSVIK SUPER-RAMP (SR) and SUPER-RAMP EXTENSION (SRX) projects. As parts of these projects test fuel rods of the same PWR type were base irradiated in the Obrigheim power reactor and power ramp tested in the STUDSVIK R2 reactor. Some of the rods were ramped using an inlet coolant water temperature 50 deg. C below the normal one. Fabricated data on the test fuel rods are presented as well as data on the base irradiation, interim examination, conditioning irradiation, power ramp irradiation and results of the post irradiation examination. The data on the change of diameter at ridges due to power ramping have shown that a lower clad temperature during ramping leads to smaller deformations. Most likely this may be explained as due to a smaller creep rate in the cladding at the lower temperature, resulting in a more severe stress situation. The combination of low cladding temperature, high ramp terminal level and the presence of a stress corrosion agent may have caused the failure of one of the test rods. (author)

  11. Modelling of pellet-clad interaction during power ramps

    International Nuclear Information System (INIS)

    Zhou, G.; Lindback, J.E.; Schutte, H.C.; Jernkvist, L.O.; Massih, A.R.; Massih, A.R.

    2005-01-01

    A computational method to describe the pellet-clad interaction phenomenon is presented. The method accounts for the mechanical contact between fragmented pellets and the zircaloy clad, as well as for chemical reaction of fission products with zircaloy during power ramps. Possible pellet-clad contact states, soft, hard and friction, are taken into account in the computational algorithm. The clad is treated as an elastic-plastic-viscoplastic material with irradiation hardening. Iodine-induced stress corrosion cracking is described by using a fracture mechanics-based model for crack propagation. This integrated approach is used to evaluate two power ramp experiments made on boiling water reactor fuel rods in test reactors. The influence of the pellet-clad coefficient of friction on clad deformation is evaluated and discussed. Also, clad deformations, pellet-clad gap size and fission product gas release for one of the ramped rods are calculated and compared with measured data. (authors)

  12. IFPE/CNEA-MOX-RAMP, CNEA Power Ramp Irradiations with (PHWR) MOX Fuels

    International Nuclear Information System (INIS)

    Marino, Armando Carlos; Turnbull, J.A.

    2000-01-01

    Description: The irradiation of the first MOX nuclear fuel rods fabricated in Argentina began in 1986. These experiences were made in the HFR-Petten reactor, Holland. The six rods were fabricated in the a Facility (GAID-CNEA-Argentina). The first rod has been used for destructive pre-irradiation characterization in the KFK (Kernforschungszentrum Karlsruhe), Germany. The second one was a pathfinder for calibrating HFR systems in Petten. Two other rods included pellets doped with iodine. The first contained mostly CsI whilst the second contained elemental iodine. The concentration of iodine was intended to simulate a burn-up of 15000 MWd/ton(M). The power histories were defined from calculations performed with the BACO code. A 15 day cycle was assumed with a power history that induced PCMI during power cycling. The last high power period was maintained until stress corrosion cracking (SCC) was induced. Two further un-doped rods were used in a sub-program named BU15. Here a burn-up of 15000 MWd/ton(M) was achieved at a low power followed by a final power ramp for one of the rods. The ramp was similar to that used for the Iodine test. The HFR irradiation was conducted satisfactorily. The objective was to attempt a correspondence in behaviour between the doped rods and BU15 rods. PIE detected the presence of micro-cracks inside the cladding of the iodine doped rods. Ramping of the BU15 rod was interrupted when an increase of coolant activity was detected. After discharge, a visual inspection of the rod showed the presence of a small circular hole in the cladding. Additional PIE showed that the hole was due to a SCC failure

  13. Power Ramp Limitation capabilities of Large PV Power Plants with Active Power Reserves

    DEFF Research Database (Denmark)

    Bogdan, Craciun; Kerekes, Tamas; Sera, Dezso

    2017-01-01

    Power Ramp Limitation (PRL) is likely to become a requirement for large scale photovoltaic power plants (LPVPPs) in order to allow the increase of PV penetration levels. Especially in islands with reduced inertia capability, this problem is more stringent: high power ramp can be caused by either...... fast irradiance changes or other participant generators for example wind power, or loads. In order to compensate for the power mismatch, LPVPPs must use Active Power Reserve (APR), by either curtailment or auxiliary storage. The paper proposes a PRL control structure for dynamic APR sizing...... and deployment. The selected test case is the power system of Puerto Rico (PREPA), modeled using the modified IEEE 12 bus benchmark system, with different levels of PV penetration. It is shown that LPVPP with PRL can effectively reduce the ramping rate of the participating generators. Considering that the large...

  14. Dipole power supply for National Synchrotron Light Source Booster upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1992-01-01

    The booster at the NSLS is being upgraded from .75 to 2 pulses per second. To accomplish this, new power supplies for the dipole, quadrupole, and sextupole magnets have been designed and are being constructed. This paper will outline the design of the dipole power supply and control system, and will present results obtained thus far

  15. Digital signal array processor for NSLS booster power supply upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second. To accomplish this, new power supplied for the dipole, quadrupole, and sextupole have been installed. This paper will outline the design and function of the digital signal processor used as the primary control element in the power supply control system

  16. Preliminary study of AC power feeders for AGS booster

    International Nuclear Information System (INIS)

    Meth, M.

    1992-01-01

    It has been proposed that the AGS Heavy Ion/Proton Booster be excited directly from the electric power distribution system without intervening an energy storage buffer such as an MG set or a magnetic energy buffer. The average power requirement of the AGS Booster is less than many single-loads presently housed on the lab site. However, the power swing will be the largest single pulsating load on the lab site. The large power swings will impact on the power grid producing utility-line disturbances such as voltage fluctuations and harmonic generation. Thus, it is necessary to carefully evaluate the quality of the electric power system resulting from the interconnection, such that the utility system is not degraded either on the lab site or at LILCO's substation

  17. 76 FR 11680 - Digital Low Power Television, Television Translator, and Television Booster Stations and Digital...

    Science.gov (United States)

    2011-03-03

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and Digital Class A Television Stations AGENCY: Federal Communications Commission. ACTION: Final rule; announcement of effective... Commission's Rules to Establish Rules for Digital Low Power, Television Translator, and Television Booster...

  18. Pressurized heavy water reactor fuel behaviour in power ramp conditions

    International Nuclear Information System (INIS)

    Ionescu, S.; Uta, O.; Parvan, M.; Ohai, D.

    2009-01-01

    In order to check and improve the quality of the Romanian CANDU fuel, an assembly of six CANDU fuel rods has been subjected to a power ramping test in the 14 MW TRIGA reactor at INR. After testing, the fuel rods have been examined in the hot cells using post-irradiation examination (PIE) techniques such as: visual inspection and photography, eddy current testing, profilometry, gamma scanning, fission gas release and analysis, metallography, ceramography, burn-up determination by mass spectrometry, mechanical testing. This paper describes the PIE results from one out of the six fuel rods. The PIE results concerning the integrity, dimensional changes, oxidation, hydriding and mechanical properties of the sheath, the fission-products activity distribution in the fuel column, the pressure, volume and composition of the fission gas, the burn-up, the isotopic composition and structural changes of the fuel enabled the characterization of the behaviour of the Romanian CANDU fuel in power ramping conditions performed in the TRIGA materials testing reactor

  19. Windscale nuclear power development laboratories power ramp experience in the Winfrith SGHWR (UK)

    International Nuclear Information System (INIS)

    Garlick, A.; Sumerling, R.; Stuttard, A.; Bond, G.G.; Howl, D.A.; Fox, W.N.; Cordall, D.; Cornell, R.M.

    SGHWR fuel has sufficient power ramping capability to permit considerable latitude in fuel management schemes. However, beyond some limiting ramping conditions, there is risk of fuel defecting. Controlled ramp experiments were therefore carried out in the reactor in order to determine the defect mechanism and define the fuel operating limitations. Cladding cracks produced during these power ramps are considered to have been a consequence of fission product stress-corrosion attack. A critical stress level for cracking, based on laboratory stress corrosion tests, have been used successfully in conjunction with computer codes to calculate cladding stresses and strains in fuel rods. Initial analysis of the conditions under which a fuel element defected at 11.6 MWd/kgU suggests that the threshold stress for failure may be decreased compared with elements at lower burn-up (5-6 MWd/kgU)

  20. The high power RF system for the KEK booster synchrotron

    International Nuclear Information System (INIS)

    Ezura, Eizi; Nakanishi, Hiroshi; Kudo, Kikuo; Toda, Makoto; Ebihara, Kiyokazu.

    1977-03-01

    Design features and procedures of the high power RF system for the KEK booster synchrotron are described. The system consists of an RF power amplifier, a ferrite-loaded accelerating cavity and an automatic cavity-tuning system. The RF voltage program and the ferrite properties, which are the determining factors for the general design and the operational performance of the system, are discussed. Procedures for estimating the power requirements are presented for both the RF power amplifier and the ferrite bias supply. A general description of the system is also given. (auth.)

  1. CANDU fuel sheath behavior in power ramp conditions

    International Nuclear Information System (INIS)

    Ionescu, S.; Uta, O; Parvan, M.

    2009-01-01

    The purpose of this work is to determine by post-irradiation examination, the behavior of CANDU domestic fuel, irradiated in TRIGA14 reactor MW(th), into a multiple / various power ramp test. After testing, the fuel rods have been examined in the hot cells using post-irradiation examination (PIE) techniques such as: visual inspection and photography, eddy current testing, profilometry, gamma scanning, fission gas release and analysis, metallography, ceramography, burn-up determination by mass spectrometry, mechanical testing. This paper describes the PIE results from one out of six fuel rods. The PIE results concerning the integrity, dimensional changes, oxidation, hydriding and mechanical properties of the sheath, the fission-products activity distribution in the fuel column, the pressure, volume and composition of the fission gas, the burn-up, the isotopic composition and structural changes of the fuel are used to confirm the security, reliability, fuel performance, and also for Romanian CANDU fuel development program. (authors)

  2. CANDU 6 fuel behaviour in power ramp conditions

    International Nuclear Information System (INIS)

    Ionescu, S.; Uta, O.; Parvan, M.

    2009-01-01

    The facilities in the Institute for Nuclear Research at Pitesti allow the testing, handling and examination of nuclear fuel and irradiated materials. The most important facilities are the TRIGA Steady State Research and Material Test Reactor and the Post-Irradiation Examination Laboratory (PIEL). The purpose of this work is to determine by post-irradiation examination, the behavior of CANDU fuel, irradiated in 14 MW TRIGA reactor. The fuel was irradiated in power ramp conditions. The results of post-irradiation examination are: - Visual inspection and photography of the outer appearance of sheath; - Profilometry (diameter, bending, ovality) and length measuring; - Determination of axial and radial distribution of the fusion products activity by gamma scanning and tomography; - Microstructural characterization by metallographic and ceramographic analyzes; - Mechanical properties determination. The data obtained from the post-irradiation examination are used to confirm the security, reliability and nuclear fuel performance and for increasing of CANDU fuel performance. (authors)

  3. An effective heuristic for combined heat-and-power production planning with power ramp constraints

    International Nuclear Information System (INIS)

    Rong, Aiying; Lahdelma, Risto

    2007-01-01

    Combined heat-and-power (CHP) production is an increasingly important technology for its efficient utilization of primary-energy resources and for reducing CO 2 emissions. In the CHP plant, the generation of heat-and-power follows a joint characteristic, which makes the determination of both the marginal power production cost (MPPC) and the feasible operating region for the plant more complicated than for the power-only generation plant. Due to the interdependence between heat and power production, the power-ramp constraints, which limit how much the power production of a CHP plant may increase or decrease between two successive periods, may also imply constraints on the heat production. In this paper, we investigate the impact of power-ramp constraints on CHP production planning and develop a robust heuristic for dealing with the power-ramp constraints based on the solution to the problem with relaxed ramp-constraints (RRC). Numerical results based on realistic production models show that the heuristic can generate high-quality solutions efficiently. (author)

  4. Low energy booster resonant power supply system

    International Nuclear Information System (INIS)

    Jach, C.

    1990-01-01

    During the particle-acceleration period, the magnet guide-field intensity, along the equilibrium orbit must rise from a minimum field (corresponding to injection energy) to the peak field, at which the protons attain their maximum energy. The field must then be reduced to its minimum value and the cycle repeated. This operation is achieved by excitation of the guide-field magnets with a 10 Hz sinusoidal waveform, which is biased by superimposing a dc component on the ac component excitation, giving a field variation of the form: b(t) = B dc - B ac sin (2π ft) where f is the magnet excitation frequency (nominally 10 Hz). Aside from saturation effects in the magnets and chokes, b(t) may be considered as a linear function of the magnet current (design of network magnetic elements should not allow more than 1% saturation, i.e., peak field should not exceed 1.25 T). With this assumption, the magnet power supply generates a current of the form (Figure 1) i m (t) = I dc - I ac sin (2π ft). 7 figs., 3 tabs

  5. Power-Capacity and Ramp-Capability Reserves for Wind Integration in Power-Based UC

    NARCIS (Netherlands)

    Morales Espana, G.; Baldick, Ross; García-González, Javier; Ramos, Andres

    2015-01-01

    This paper proposes a power-based network-constrained unit commitment (UC) model as an alternative to the traditional deterministic UCs to deal with wind generation uncertainty. The formulation draws a clear distinction between power-capacity and ramp-capability reserves to deal with wind production

  6. Optimized Swinging Door Algorithm for Wind Power Ramp Event Detection: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Mingjian; Zhang, Jie; Florita, Anthony R.; Hodge, Bri-Mathias; Ke, Deping; Sun, Yuanzhang

    2015-08-06

    Significant wind power ramp events (WPREs) are those that influence the integration of wind power, and they are a concern to the continued reliable operation of the power grid. As wind power penetration has increased in recent years, so has the importance of wind power ramps. In this paper, an optimized swinging door algorithm (SDA) is developed to improve ramp detection performance. Wind power time series data are segmented by the original SDA, and then all significant ramps are detected and merged through a dynamic programming algorithm. An application of the optimized SDA is provided to ascertain the optimal parameter of the original SDA. Measured wind power data from the Electric Reliability Council of Texas (ERCOT) are used to evaluate the proposed optimized SDA.

  7. Power ramp testing method for PWR fuel rod at research reactor

    International Nuclear Information System (INIS)

    Zhou Yidong; Zhang Peisheng; Zhang Aimin; Gao Yongguang; Wang Huarong

    2003-01-01

    A tentative power ramp test for short PWR fuel rod has been conducted at the Heavy Water Research Reactor (HWRR) in China Institute of Atomic Energy (CIAE). The test fuel rod was cooled by the circulating water in the test loop. The power ramp was realized by moving solid neutron-absorbing screen around the fuel rod. The linear power of the fuel rod increased from 220 W/cm to 340 W/cm with a power ramp rate of 20 W/cm/min. The power of the fuel rod was monitored by both in-core thermal and nuclear measurement sensors in the test rig. This test provides experiences for further developing the power ramp test methods for PWR fuel rods at research reactor. (author)

  8. Analyzing the Impact of Solar Power on Multi-Hourly Thermal Generator Ramping

    Energy Technology Data Exchange (ETDEWEB)

    Rosenkranz, Joshua-Benedict; Brancucci Martinez-Anido, Carlo; Hodge, Bri-Mathias

    2016-04-08

    Solar power generation, unlike conventional forms of electricity generation, has higher variability and uncertainty in its output because solar plant output is strongly impacted by weather. As the penetration rate of solar capacity increases, grid operators are increasingly concerned about accommodating the increased variability and uncertainty that solar power provides. This paper illustrates the impacts of increasing solar power penetration on the ramping of conventional electricity generators by simulating the operation of the Independent System Operator -- New England power system. A production cost model was used to simulate the power system under five different scenarios, one without solar power and four with increasing solar power penetrations up to 18%, in terms of annual energy. The impact of solar power is analyzed on six different temporal intervals, including hourly and multi-hourly (2- to 6-hour) ramping. The results show how the integration of solar power increases the 1- to 6-hour ramping events of the net load (electric load minus solar power). The study also analyzes the impact of solar power on the distribution of multi-hourly ramping events of fossil-fueled generators and shows increasing 1- to 6-hour ramping events for all different generators. Generators with higher ramp rates such as gas and oil turbine and internal combustion engine generators increased their ramping events by 200% to 280%. For other generator types--including gas combined-cycle generators, coal steam turbine generators, and gas and oil steam turbine generators--more and higher ramping events occurred as well for higher solar power penetration levels.

  9. Power ramp tests of MOX fuel rods. HBWR irradiation with the instrument rig, IFA-591

    International Nuclear Information System (INIS)

    Ozawa, Takayuki; Abe, Tomoyuki

    2006-03-01

    Plutonium-uranium mixed oxide (MOX) fuel rods of instrumental rig IFA-591 were ramped in HBWR to study the Advanced Thermal Reactor (ATR) MOX fuel behavior during transient operation and to determine a failure threshold of the MOX fuel rods. Eleven segments were base-irradiated in ATR 'FUGEN' up to 18.4 GWd/t. Zirconium liner claddings were adopted for four segments of them. As the results of non-destructive post irradiation examinations (PIEs) after the base-irradiation and before the ramp tests, no remarkable behavior affecting the integrity of fuel assembly and fuel rod was confirmed. All segments to be used for the ramp tests, which consisted of the multi-step ramp tests and the single-step ramp tests, had instrumentations for in-pile measurements of cladding elongation or plenum pressure, and heated up to the maximum linear power of 58.3-68.4 kW/m without failure. The major results of ramp tests are as follows: There is no difference in PCMI behaviors between two type rods of Zry-2 and Zirconium liner claddings from the in-pile measurements of cladding elongation and plenum pressure. The computations of cladding elongation and inner pressure gave slightly lower elongation and pressure than the in-pile measurements during the ramp-test. However, the cladding relaxation during the power hold was in good agreement, and the fission gas release behavior during cooling down could be evaluated by taking into account the relaxation of contact pressure between pellet and cladding. Although the final power during IFA-591 ramp tests reached the higher linear power than the failure threshold power of UO 2 fuel rods, no indication of fuel failure was observed during the ramp tests. The cladding relaxation due to the creep deformation of the MOX pellets at high temperature could be confirmed at the power steps during the multi-ramp test. The fission gas release due to the emancipation from PCMI stress was observed during the power decreasing. The burn-up dependence could be

  10. Prediction of power ramp defects - development of a physically based model and evaluation of existing criteria

    International Nuclear Information System (INIS)

    Notley, M.J.F.; Kohn, E.

    2001-01-01

    Power-ramp induced fuel failure is not a problem in the present CANDU reactors. The current empirical correlations that define probability of failure do not agree one-with-another and do not allow extrapolation outside the database. A new methodology, based on physical processes, is presented and compared to data. The methodology calculates the pre-ramp sheath stress and the incremental stress during the ramp, and whether or not there is a defect is predicted based on a failure threshold stress. The proposed model confirms the deductions made by daSilva from an empirical 'fit' to data from the 1988 PNGS power ramp failure incident. It is recommended that daSilvas' correlation be used as reference for OPG (Ontario Power Generation) power reactor fuel, and that extrapolation be performed using the new model. (author)

  11. Solar Power Ramp Events Detection Using an Optimized Swinging Door Algorithm: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Mingjian; Zhang, Jie; Florita, Anthony; Hodge, Bri-Mathias; Ke, Deping; Sun, Yuanzhang

    2015-08-07

    Solar power ramp events (SPREs) are those that significantly influence the integration of solar power on non-clear days and threaten the reliable and economic operation of power systems. Accurately extracting solar power ramps becomes more important with increasing levels of solar power penetrations in power systems. In this paper, we develop an optimized swinging door algorithm (OpSDA) to detection. First, the swinging door algorithm (SDA) is utilized to segregate measured solar power generation into consecutive segments in a piecewise linear fashion. Then we use a dynamic programming approach to combine adjacent segments into significant ramps when the decision thresholds are met. In addition, the expected SPREs occurring in clear-sky solar power conditions are removed. Measured solar power data from Tucson Electric Power is used to assess the performance of the proposed methodology. OpSDA is compared to two other ramp detection methods: the SDA and the L1-Ramp Detect with Sliding Window (L1-SW) method. The statistical results show the validity and effectiveness of the proposed method. OpSDA can significantly improve the performance of the SDA, and it can perform as well as or better than L1-SW with substantially less computation time.

  12. Power supply for 700 MeV booster ring dipole and quadrupole magnets

    International Nuclear Information System (INIS)

    Thipsay, A.P.; Kotaiah, S.; Ramamurthi, S.S.

    1993-01-01

    The power supply to energize main coils of the booster dipole and quadrupole magnets which are connected in series is discussed. The current in this coils is increased from 28.6 Amps at injection energy (20 MeV) to 1000 Amps at the extraction energy (700 MeV) in 0.2 sec with a stability of 0.1%. Current is maintained at 1000 Amps for 0.05 to 0.166 sec with 0.02% stability after which the current is brought down fast to the injection energy level to get the required repetition rate of 2 Hz. The rectifier stage uses four fully controlled thyristorised bridges connected in series which are switched selectively at different times to get the required trapezoidal current waveform. In the ramp down period, all the bridges are operated in the inverter mode, whereby the stored energy in the magnets is fed back to the mains. An inductor and a capacitor is used as a passive filter to attenuate the voltage ripple to the rectifier. Two capacitor banks in the passive filter are switched selectively while ramping and flat top periods to reduce the error in current within tolerable limits. An active filter is used to further reduce ripple current in magnets. The current control circuit is characterized by two loops, one with voltage feedback and the other with a current feedback. A feed forward correction is also given in the voltage feedback loop to account for the charge in the inductance of the magnets at different current levels. (author). 2 figs

  13. 76 FR 72849 - Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend...

    Science.gov (United States)

    2011-11-28

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend Rules for Digital Class A Television Stations AGENCY: Federal Communications Commission. ACTION: Final rule... for Digital Low Power Television, Television Translator, and Television Booster Stations and to Amend...

  14. Extrapolating power-ramp performance criteria for current and advanced CANDU fuels

    International Nuclear Information System (INIS)

    Tayal, M.; Chassie, G.G.

    2000-06-01

    To improve the precision and accuracy of power-ramp performance criteria for high-burnup fuel, we have examined in-reactor fuel performance data as well as out-reactor test data. The data are consistent with some of the concepts used in the current formulations for defining fuel failure thresholds, such as size of power-ramp and extent of burnup. Our review indicates that there is a need to modify some other aspects of the current formulations; therefore, a modified formulation is presented in this paper. The improvements mainly concern corrodent concentration and its relationships with threshold stress for failure. The new formulation is consistent with known and expected trends such as strength of Zircaloy in corrosive environment, timing of the release of fission products to the pellet-to-sheath gap, CANLUB coating, and fuel burnup. Because of the increased precision and accuracy, the new formulation is better able to identify operational regimes that are at risk of power-ramp failures; this predictive ability provides enhanced protection to fuel against power-ramp defects. At die same time, by removing unnecessary conservatisms in other areas, the new formulation permits a greater range of defect-free operational envelope as well as larger operating margins in regions that are, in fact, not prone to power-ramp failures. (author)

  15. Japanese programme on the development of high duty fuel and related power ramping tests

    International Nuclear Information System (INIS)

    Mishima, Y.

    1983-01-01

    Power ramping tests hitherto planned or carried out in Japan can be classified into two categories: 1) the tests programme by private organizations on fuel behaviour under various conditions of power ramping, in participating international programmes; and 2) a partially government sponsored programme, which was officially inaugurated in 1981 under the title of High-Duty Fuel Development Programme. The latter has been carried out by the Nuclear Power Engineering Test Centre, based on the schedule decided by the MITI Committee (chaired by the author), for a period of 10 years. These programmes will be described with emphasis on the latter (National Programme). (author)

  16. Probabilistic Wind Power Ramp Forecasting Based on a Scenario Generation Method: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Qin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Florita, Anthony R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Krishnan, Venkat K [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hodge, Brian S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cui, Mingjian [Univ. of Texas-Dallas, Richardson, TX (United States); Feng, Cong [Univ. of Texas-Dallas, Richardson, TX (United States); Wang, Zhenke [Univ. of Texas-Dallas, Richardson, TX (United States); Zhang, Jie [Univ. of Texas-Dallas, Richardson, TX (United States)

    2017-08-31

    Wind power ramps (WPRs) are particularly important in the management and dispatch of wind power, and they are currently drawing the attention of balancing authorities. With the aim to reduce the impact of WPRs for power system operations, this paper develops a probabilistic ramp forecasting method based on a large number of simulated scenarios. An ensemble machine learning technique is first adopted to forecast the basic wind power forecasting scenario and calculate the historical forecasting errors. A continuous Gaussian mixture model (GMM) is used to fit the probability distribution function (PDF) of forecasting errors. The cumulative distribution function (CDF) is analytically deduced. The inverse transform method based on Monte Carlo sampling and the CDF is used to generate a massive number of forecasting error scenarios. An optimized swinging door algorithm is adopted to extract all the WPRs from the complete set of wind power forecasting scenarios. The probabilistic forecasting results of ramp duration and start time are generated based on all scenarios. Numerical simulations on publicly available wind power data show that within a predefined tolerance level, the developed probabilistic wind power ramp forecasting method is able to predict WPRs with a high level of sharpness and accuracy.

  17. Probabilistic Wind Power Ramp Forecasting Based on a Scenario Generation Method

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Qin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Florita, Anthony R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Krishnan, Venkat K [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hodge, Brian S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cui, Mingjian [University of Texas at Dallas; Feng, Cong [University of Texas at Dallas; Wang, Zhenke [University of Texas at Dallas; Zhang, Jie [University of Texas at Dallas

    2018-02-01

    Wind power ramps (WPRs) are particularly important in the management and dispatch of wind power and currently drawing the attention of balancing authorities. With the aim to reduce the impact of WPRs for power system operations, this paper develops a probabilistic ramp forecasting method based on a large number of simulated scenarios. An ensemble machine learning technique is first adopted to forecast the basic wind power forecasting scenario and calculate the historical forecasting errors. A continuous Gaussian mixture model (GMM) is used to fit the probability distribution function (PDF) of forecasting errors. The cumulative distribution function (CDF) is analytically deduced. The inverse transform method based on Monte Carlo sampling and the CDF is used to generate a massive number of forecasting error scenarios. An optimized swinging door algorithm is adopted to extract all the WPRs from the complete set of wind power forecasting scenarios. The probabilistic forecasting results of ramp duration and start-time are generated based on all scenarios. Numerical simulations on publicly available wind power data show that within a predefined tolerance level, the developed probabilistic wind power ramp forecasting method is able to predict WPRs with a high level of sharpness and accuracy.

  18. IAEA specialists' meeting on power ramping and cycling behaviour of water reactor fuel. Summary report

    International Nuclear Information System (INIS)

    1983-06-01

    At its fourth Annual Meeting, the IAEA International Working Group on Water Reactor Fuel Performance and Technology (IWGFPT) recommended that the Agency should hold a second Specialists' Meeting on 'Power Ramping and Cycling Behaviour of Water Reactor Fuel'. As research activities related to power ramping and cycling of water reactor fuel have been pursued vigorously, it was the objective of this meeting to review and discuss today's State of the Art and current understanding of water reactor fuel behaviour related to this these. Emphasis should be on practical experience and experimental investigations. The meeting was organised in five sessions: Power ramping and power cycling programs in power and and research reactors; Experimental methods; Power ramping and cycling results; Investigations and results of separate effects, especially related to PCI, defect mechanism, mechanical response, fuel design, and specially related to fission gas release; Operational strategies, recommendations and economic implications. The session chairmen, together with the speakers, prepared and presented reports with summary, conclusions and recommendations of the individual sessions. These reports are added to this summary report

  19. Power ramping test in the JMTR for PCI study of water reactor fuel

    International Nuclear Information System (INIS)

    Nakata, H.; Kanbara, M.; Ichikawa, M.

    1984-01-01

    Power ramping test is essential for PCI study of water reactor fuel. Boiling water capsules have been used for the tests in the JMTR. Heat generation of fuel rod in the capsule can be changed by the He-3 power control facility during reactor operation. Four specially designed fuel rods have been ramped to about 41-43 kW/m; two of them have small gaps filled with iodine, the other two are equipped with centerline temperature thermocouple. Fuel rod elongation detector is equipped to each capsule. For the fuel rods with small gap, unique contraction followed by ordinary fuel relaxation behaviour was observed right after the fast ramping. None of them failed. Future programme includes a series of tests of fuel rods irradiated in the high-pressure water loop at the JMTR and a verification test of remedy fuel which allows daily-load-following operation of BWRs. (author)

  20. Power ramp failures in water reactor fuel elements. Experience from power reactors, likely mechanisms and potential remedies

    International Nuclear Information System (INIS)

    Gittus, J.H.; Pickman, D.O.

    1980-01-01

    Power ramp failure experience in PWR, BWR, CANDU, and SGHWR fuel elements is reviewed. The mechanism of failure is described and the proven and potential remedies are listed and the actual or hoped-for benefits explained. Power ramp failures are produced, most probably, by stress corrosion cracking of the Zircaloy fuel sheaths. The stress is produced by thermal expansion of the UO 2 pellet, which stretches the clad and can produce yielding. The stress is highest in arcs of cladding that bridge cracks in the pellet. Iodine vapour, produced by transmutation is the likely corrodant in the stress corrosion failure process. It is probably released by the radiolytic dissociation of CsI and diffuses as interstitial atoms to the UO 2 grain boundaries from which it escapes to attack the clad. Power reactor experience shows that there is a threshold rating, below which failure is unlikely and that power can be safety ramped to above threshold levels providing this is done slowly. Prepressurisation with helium seems to have halved the power ramp failure rate in PWRs whilst the adoption of hollow pellets virtually eliminated power ramp failures in AGR. CANLUB, a pellet clad barrier layer, has reduced the failure rate in CANDU. Other remedies, such as copper barrier layers and fission product retentive pellets are under development

  1. Modelling decremental ramps using 2- and 3-parameter "critical power" models.

    Science.gov (United States)

    Morton, R Hugh; Billat, Veronique

    2013-01-01

    The "Critical Power" (CP) model of human bioenergetics provides a valuable way to identify both limits of tolerance to exercise and mechanisms that underpin that tolerance. It applies principally to cycling-based exercise, but with suitable adjustments for analogous units it can be applied to other exercise modalities; in particular to incremental ramp exercise. It has not yet been applied to decremental ramps which put heavy early demand on the anaerobic energy supply system. This paper details cycling-based bioenergetics of decremental ramps using 2- and 3-parameter CP models. It derives equations that, for an individual of known CP model parameters, define those combinations of starting intensity and decremental gradient which will or will not lead to exhaustion before ramping to zero; and equations that predict time to exhaustion on those decremental ramps that will. These are further detailed with suitably chosen numerical and graphical illustrations. These equations can be used for parameter estimation from collected data, or to make predictions when parameters are known.

  2. Operational experiences of the spallation neutron source superconducting linac and power ramp-up

    International Nuclear Information System (INIS)

    Kim, Sang-Ho

    2009-01-01

    The spallation neutron source (SNS) is a second generation pulsed neutron source and designed to provide a 1-GeV, 1.44-MW proton beam to a mercury target for neutron production. Since the commissioning of the accelerator complex in 2006, the SNS has started its operation for neutron production and beam power ramp-up has been in progress toward the design goal. All subsystems of the SNS were designed and developed for substantial improvements compared to existing accelerators because the design beam power is almost an order of magnitude higher compared to existing neutron facilities and the achievable neutron scattering performance will exceed present sources by more than a factor of 20 to 100. In this paper, the operational experiences with the SNS Superconducting Linac (SCL), Power Ramp-up Plan to reach the design goal and the Power Upgrade Plan (PUP) will be presented including machine, subsystem and beam related issues.

  3. 76 FR 44821 - Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend...

    Science.gov (United States)

    2011-07-27

    ... this proceeding in order to allow a timely and successful completion of the low power television digital transition. Although Congress established a hard deadline of June 12, 2009 for full power stations...] Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend Rules...

  4. 75 FR 63766 - Digital Low Power Television, Television Translator, and Television Booster Stations and Digital...

    Science.gov (United States)

    2010-10-18

    ... complete the low power television station digital transition. Although Congress established a hard deadline of June 12, 2009 for full-power stations to cease analog operations and begin operating only in...] Digital Low Power Television, Television Translator, and Television Booster Stations and Digital Class A...

  5. Analysis of pellet cladding mechanical interaction margins in PWR fuel under power ramp condition

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jong Sung; Lee, Jin Seok; Kim, Hyeong Koo; Chung, Jing On [Korea Nuclear Fuel, Daejeon (Korea, Republic of); Mitchell, David; Aleshin, Yuriy [Westinghouse Electric Company, South Carolina (Colombia)

    2008-10-15

    Small flaws in PWR and BWR fuel such as a missing pellet surface (MPS), pellet fragmentation and cladding defects, play an important role during conditions when there is pellet-cladding mechanical interaction (PCMI) under power ramp conditions. In order to confirm the margin against PWR fuel failure by PCMI with the pellet and cladding imperfections, first the separating hoop stress for cladding failure is determined using the ANSYS FEA model for failed and intact fuel rods under various power ramp conditions. Second, the idealized rod power history is developed to achieve the maximum uniform cladding stress during the normal operational transients. Finally, the stress multiplication factor is calculated with the FEA model to deal with the effect of various shapes and sizes of MPS, pellet fragmentation and cladding defects on the PCMI behavior. Then the stress multiplication factor with pellet imperfections and cladding defects allowed by manufacturing tolerances is applied to the fuel performance analysis code results using the idealized power history to confirm margin to PCMI under power ramp condition.

  6. Magnet power supply system for the ALS storage ring and booster

    International Nuclear Information System (INIS)

    Jackson, L.T.; Luchini, K.; Lutz, I.

    1993-05-01

    The Magnet Power Supply System is described by specification, design, hardware, and operating experience. A unique system for the one Hz, 1.5 GeV Booster, where the wideband QF and QD power supplies track the dipole current to within 0.1% at injection will be detailed. AC distribution system considerations related to inverting the stored energy of the booster magnet back into power grid will be discussed. The rational for linear correctors and individual quad supplies (225 total units) will be placed within the context of the storage-ring requirements

  7. Software environment and configuration for the DSP controlled NSLS booster power supplies

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second by means of the installation of new dipole, quadrupole, and sextupole power supplies. The control system of these power supplies employs general purpose digital signal processing modules, and therefore, software support is required. This paper outlines the development system configuration, and the software environment

  8. Influence of the hold period on the fuel rod behaviour during a power ramp

    International Nuclear Information System (INIS)

    Bourreau, S.; Lansiart, S.; Couffin, P.; Verdeau, C.; Decroix, G.M.; Grandjean, M.-C.; Hugot, H.; Mermaz, F.; Van Schel, E.

    2000-01-01

    This paper presents three examples of power ramp tests performed in the OSIRIS experimental reactor, located at Saclay (France). The rods tested during these experiments stem from the same segmented 'mother' rod, pre-irradiated for two cycles in a French PWR. They underwent very similar power transient conditions, except for the hold time at Ramp Terminal Level (RTL) - respectively 41.5 kW/m (J12/2), 40.7 kW/m (J12/4) and 39.5 kW/m (J12/5) for RTL, but zero (J12/2), 16 minutes (J12/4) and 12 hours (J12/5) for the hold time at RTL. No failure was detected for any of the three experiments despite the relatively high mechanical stress applied to the cladding in the case of J12/2. Moreover, although no hold time was maintained at RTL, a permanent deformation clearly appeared on the clad during the power transient. An analysis of the cladding deformation has also been undertaken concerning the J12/2, J12/4 and J12/5 experiments. This study was realized by carrying out post-calculations of the three experiments with a 2D fuel modelling code using the finite element method. The computations satisfactorily reproduce the influence of hold time on the cladding deformation during the power transients, especially for the J12/2 and J12/4 experiments with hold times enclosing the failure times experimentally observed for power ramp tests. For the hold time of 12 hours, the micrographic observations of the fuel, compared to the case of the 16 minutes hold time, support the hypothesis of weak but noticeable gaseous swelling. (author)

  9. Power ramp rate capabilities of a 5 kW proton exchange membrane fuel cell system with discrete ejector control

    Science.gov (United States)

    Nikiforow, K.; Pennanen, J.; Ihonen, J.; Uski, S.; Koski, P.

    2018-03-01

    The power ramp rate capabilities of a 5 kW proton exchange membrane fuel cell (PEMFC) system are studied theoretically and experimentally for grid support service applications. The fuel supply is implemented with a fixed-geometry ejector and a discrete control solution without any anode-side pressure fluctuation suppression methods. We show that the stack power can be ramped up from 2.0 kW to 4.0 kW with adequate fuel supply and low anode pressure fluctuations within only 0.1 s. The air supply is implemented with a centrifugal blower. Air supply ramp rates are studied with a power increase executed within 1 and 0.2 s after the request, the time dictated by grid support service requirements in Finland and the UK. We show that a power ramp-up from 2.0 kW to 3.7 kW is achieved within 1 s with an initial air stoichiometry of 2.5 and within 0.2 s with an initial air stoichiometry of 7.0. We also show that the timing of the power ramp-up affects the achieved ancillary power capacity. This work demonstrates that hydrogen fueled and ejector-based PEMFC systems can provide a significant amount of power in less than 1 s and provide valuable ancillary power capacity for grid support services.

  10. Wind Power Ramp Events Prediction with Hybrid Machine Learning Regression Techniques and Reanalysis Data

    Directory of Open Access Journals (Sweden)

    Laura Cornejo-Bueno

    2017-11-01

    Full Text Available Wind Power Ramp Events (WPREs are large fluctuations of wind power in a short time interval, which lead to strong, undesirable variations in the electric power produced by a wind farm. Its accurate prediction is important in the effort of efficiently integrating wind energy in the electric system, without affecting considerably its stability, robustness and resilience. In this paper, we tackle the problem of predicting WPREs by applying Machine Learning (ML regression techniques. Our approach consists of using variables from atmospheric reanalysis data as predictive inputs for the learning machine, which opens the possibility of hybridizing numerical-physical weather models with ML techniques for WPREs prediction in real systems. Specifically, we have explored the feasibility of a number of state-of-the-art ML regression techniques, such as support vector regression, artificial neural networks (multi-layer perceptrons and extreme learning machines and Gaussian processes to solve the problem. Furthermore, the ERA-Interim reanalysis from the European Center for Medium-Range Weather Forecasts is the one used in this paper because of its accuracy and high resolution (in both spatial and temporal domains. Aiming at validating the feasibility of our predicting approach, we have carried out an extensive experimental work using real data from three wind farms in Spain, discussing the performance of the different ML regression tested in this wind power ramp event prediction problem.

  11. Irradiation devices for experiences on power ramps and cyclings at the CEA/DERPE

    International Nuclear Information System (INIS)

    Friboulet, C.; Roche, M.

    1987-05-01

    In this paper the authors describe briefly the irradiation devices used by the CEA/DERPE. These irradiation devices are of two types: irradiation specimen capsule (AQUILON, BOSS, GRIFFON), water loop (ISABELLE 1, JET-POMPE, ISABELLE 4, IRENE, OPERA) in which the conditions are those of PWR Reactor. They are implanted in the OSIRIS and SILOE reactors with a thermal neutron flux of 2.5 10 14 n/cm 2 .s. In the pool reactor non destructive tests can be made on pin fuels to give valuable informations on their behaviour under power ramps and cyclings [fr

  12. NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

    Science.gov (United States)

    Priskos, Alex

    2016-01-01

    NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant

  13. Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    2015-10-19

    The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

  14. Energy Storage Requirements for PV Power Ramp Rate Control in Northern Europe

    Directory of Open Access Journals (Sweden)

    Julius Schnabel

    2016-01-01

    Full Text Available Photovoltaic (PV generators suffer from fluctuating output power due to the highly fluctuating primary energy source. With significant PV penetration, these fluctuations can lead to power system instability and power quality problems. The use of energy storage systems as fluctuation compensators has been proposed as means to mitigate these problems. In this paper, the behavior of PV power fluctuations in Northern European climatic conditions and requirements for sizing the energy storage systems to compensate them have been investigated and compared to similar studies done in Southern European climate. These investigations have been performed through simulations that utilize measurements from the Tampere University of Technology solar PV power station research plant in Finland. An enhanced energy storage charging control strategy has been developed and tested. Energy storage capacity, power, and cycling requirements have been derived for different PV generator sizes and power ramp rate requirements. The developed control strategy leads to lesser performance requirements for the energy storage systems compared to the methods presented earlier. Further, some differences on the operation of PV generators in Northern and Southern European climates have been detected.

  15. Booster main magnet power supply, present operation and potential future upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

    2011-03-28

    The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

  16. Operational status of the AGS Booster Main Ring Magnet Power Supply

    International Nuclear Information System (INIS)

    Soukas, A.; Bannon, M.; Geller, J.; McNerney, A.J.; Sandberg, J.; Toldo, F.; Zhang, S.Y.

    1992-01-01

    The Booster is a multipurpose accelerator interposed between a 200 MeV linac, a pair of 15 MV Tandem Van deGraaf accelerators, and the AGS. It can operate on slow cycles of 0.3 Hertz pulse repetition frequency up to a maximum of 7.5 Hertz. The different cycles, from long front porches for long injection or accumulation periods or flattops for slow extraction, to normal fast extraction cycles, accommodate protons, heavy ions (h.i.) and polarized protons. One of the systems enabling the flexible Booster operation is the Main Ring Magnet Power Supply (MRPS) system. It consist of a series connection of six, 1000 volt, multiphase rectifiers together with by pass switches. Two of the six operate at currents up to 6 kA and the rest up to 3 kA. All bypass switches are rated for 6 kA. The system is equipped with passive, damped LCRC filters as well as an active transformer coupled correction system. The MRPS is connected directly to the Long Island 69 Kv bus via a dedicated 20 MVA transformer. The choice of a series of modules enables the very flexible cycle generation and at the same time minimizes the deleterious effects of power factor and harmonics on the ac lines

  17. Post irradiation tests on CANDU fuel irradiated in power ramp conditions

    International Nuclear Information System (INIS)

    Ionescu, Silviu; Uta, Octavian; Parvan, Marcel; Gentea, Cristian; Ichim, Ovidiu

    2008-01-01

    Nuclear Research Branch Pitesti disposes of facilities, which allow the testing, manipulation and examination of nuclear fuel and of irradiated structure materials in CANDU reactor from Cernavoda NPP. These facilities imply the materials testing reactor TRIGA and the Post-Irradiation Examination Laboratory (PIEL). The purpose of this work is to determine by post-irradiate examination, the behavior of CANDU indigenous fuel, irradiated in 14 MW(th) TRIGA reactor into a multiple/various power ramp tests. The results of post-irradiate examination consist of: - Visual inspection and photography of the outer appearance of sheath; - Profilometry (diameter, bending, ovalization) and length measuring; - Determination of axial and radial distribution of the fission products activity by gamma scanning and tomography; - measurement of pressure, volume and isotopic composition of fission gas; - Microstructural characterization by metallographic and ceramographic analyzes; - Isotopic composition and burn-up determination; - Mechanical properties determination. The obtained data from the post-irradiate examinations are used, on one hand, in order to confirm the security, reliability and nuclear fuel performance, and on the other hand, for further optimization of the CANDU fuel. (authors)

  18. Fabrication of a CANFLEX-RU designed bundle for power ramp irradiation test in NRU

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Moon Sung

    2000-11-01

    The BDL-443 CANFLEX-RU bundle AKW was fabricated at Korea Atomic Energy Research Institute (KAERI) for power ramp irradiation testing in NRU reactor. The bundle was fabricated with IDR and ADU fuel pellets in adjacent elements and contains fuel pellets enriched to 1.65 wt% {sup 235}U in the outer and intermediate rings and also contains pellets enriched to 2.00 wt% {sup 235}U in the inner ring. This bundle does not have a center element to allow for insertion on a hanger bar. KAERI produced the IDR pellets with the IDR-source UO{sub 2} powder supplied by BNFL. ADU pellets were fabricated and supplied by AECL. Bundle kits (Zircaloy-4 end plates, end plugs, and sheaths with brazed appendages) manufactured at KAERI earlier in 1996 were used for the fabrication of the bundle. The CANFLEX bundle was fabricated successfully at KAERI according to the QA provisions specified in references and as per relevant KAERI drawings and technical specification. This report covers the fabrication activities performed at KAERI. Fabrication processes performed at AECL will be documented in a separate report.

  19. Calculation of Booster power requirements and power line flicker for 1.5 GeV proton operation

    International Nuclear Information System (INIS)

    Meth, A.; Ratti, A.

    1992-01-01

    The Booster power requirements and power line flicker has been previously calculated for the 1 GEV proton cycle. Since then the maximum proton energy has been increased to 1.5 GEV, and the cycle period increased from 100 to 133 millisec. the design manual lists the peak magnet current as 2220A (previous value of 1672A). The maximum stored energy is increased by a factor of 1.763 and the power swing is increased by a factor of 1.32; increasing the flicker approximately by this factor. The required magnet voltage has been calculated and is given for the dipole and quadrupole strings. The total power at the AC bus bar isgiven. To calculate the reactive power, the dipole excitation is assumed to consist of 5--1000 volt supplies in series and sequentially switched. The quadrupole supply consist of 5--175 volt supplies in series and sequentially switched

  20. Does a booster intervention augment the preventive effects of an abbreviated version of the coping power program for aggressive children?

    Science.gov (United States)

    Lochman, John E; Baden, Rachel E; Boxmeyer, Caroline L; Powell, Nicole P; Qu, Lixin; Salekin, Karen L; Windle, Michel

    2014-01-01

    Booster interventions have been presumed to be important methods for maintaining the effects of evidence-based programs for children with behavioral problems, but there has been remarkably little empirical attention to this assumption. The present study examines the effect of a child-oriented booster preventive intervention with children who had previously received an abbreviated version (24 child sessions, 10 parent sessions) of the Coping Power targeted prevention program. Two hundred and forty-one children (152 boys, 89 girls) were screened as having moderate to high levels of aggressive behavior in 4th grade, then half were randomly assigned to receive the abbreviated Coping Power program in 5th grade, and half of the preventive intervention children were then randomly assigned to a Booster condition in 6th grade. The Booster sessions consisted of brief monthly individual contacts, and were primarily with the children. Five assessments across 4 years were collected from teachers, providing a three-year follow-up for all children who participated in the project. Results indicated that the abbreviated Coping Power program (one-third shorter than the full intervention) had long-term effects in reducing children's externalizing problem behaviors, proactive and reactive aggression, impulsivity traits and callous-unemotional traits. The Booster intervention did not augment these prevention effects. These findings indicate that a briefer and more readily disseminated form of an evidence-based targeted preventive intervention was effective. The findings have potential implications for policy and guidelines about possible intervention length and booster interventions.

  1. Analysis of power ramp rate and minimum power controllability of the MMS model for a plant dynamics analysis of a Prototype SFR

    International Nuclear Information System (INIS)

    Kim, Eui Kwang; Kim, Dehee; Joo, Hyungkook; Lee, Taeho

    2014-01-01

    A full plant dynamic model was developed for a prototype SFR using the Modular Modeling System (MMS). It includes the modeling of various subsystems such as the neutronics, primary and intermediate sodium systems of the NSSS, steam and water systems of the BOP, BOP controls, and the supervisory plant controls. The NSSS model is subdivided into component models, such as a Core, IHXs, Pumps, SGs, and the rest of the NSSS loop model. The BOP model is subdivided into a steam subsystem, feedwater subsystem, and preheater subsystem. Plant transient tests were performed to study the operational considerations. It includes varying the power ramp rate and studying the controllability at minimum power. Plant transient tests were performed to study operational considerations by using the MMS model for a prototype SFR. It includes varying the power ramp rate, studying the controllability at the minimum power set point. At a power ramp rate of higher than 2%, the steam temperature has a large deviation from the target. As the power set point decreases, the PHTS hot leg temperature and steam temperature tend to have higher deviations. After further refinement of the MMS model, it can be useful for developing the plant operation logics of the prototype SFR

  2. Fuel rod failure due to marked diametral expansion and fuel rod collapse occurred in the HBWR power ramp experiment

    International Nuclear Information System (INIS)

    Yanagisawa, Kazuaki

    1985-12-01

    In the power ramp experiment with the BWR type light water loop at the HBWR, the two pre-irradiated fuel rods caused an unexpected pellet-cladding interaction (PCI). One occurred in the fuel rod with small gap of 0.10 mm, which was pre-irradiated up to the burn-up of 14 MWd/kgU. At high power, the diameter of the rod was increased markedly without accompanying significant axial elongation. The other occurred in the rod with a large gap of 0.23 mm, which was pre-irradiated up to the burn-up of 8 MWd/kgU. The diameter of the rod collapsed during a diameter measurement at the maximum power level. The causes of those were investigated in the present study by evaluating in-core data obtained from equipped instruments in the experiment. It was revealed from the investigation that these behaviours were attributed to the local reduction of the coolant flow occurred in the region of a transformer in the ramp rig. The fuel cladding material is seemed to become softened due to temperature increase caused by the local reduction of the coolant flow, and collapsed by the coolant pressure, either locally or wholly depending on the rod diametral gap existed. (author)

  3. Dynamic compensation of the Silver self-powered neutron detector in the ramp program at the OSIRIS reactor

    International Nuclear Information System (INIS)

    Moulin, D.J.

    1994-01-01

    The Silver self-powered neutron detector (SPND) is a common detector used in the ramp program at the OSIRIS reactor. The Silver SPND signal is a reference during steady states, but its response is too slow for monitoring transient tests. In order to compensate for the inherent time delay a mathematical processing method of the Silver SPND signal was developed. Based on a convolution-type resolution of the kinetics equations, a dynamic compensation algorithm can be used for transient conditions as well as steady state conditions. A computer program reconstructs, in real-time, the dynamic neutron flux sensed by the Silver detector from the current measured between the emitter and the collector of the SPND. Although this method decreases slightly the signal-to-noise ratio, it maintains the SPND's characteristics and reduces the response time from about 10 minutes to less than 4 seconds for a step change in flux. This provides for prompt and accurate measurement of fuel rod power during ramp experiments in the OSIRIS reactor. This development makes the Silver SPND very suitable for many on-line monitoring applications

  4. A 4 MA, 500 ns pulsed power generator CQ-4 for characterization of material behaviors under ramp wave loading.

    Science.gov (United States)

    Wang, Guiji; Luo, Binqiang; Zhang, Xuping; Zhao, Jianheng; Sun, Chengwei; Tan, Fuli; Chong, Tao; Mo, Jianjun; Wu, Gang; Tao, Yanhui

    2013-01-01

    A pulsed power generator CQ-4 was developed to characterize dynamic behaviors of materials under ramp wave loading, and to launch high velocity flyer plates for shock compression and hypervelocity impact experiments of materials and structures at Institute of Fluid Physics, China Academy of Engineering Physics. CQ-4 is composed of twenty capacitor and primary discharge switch modules with total capacitance of 32 μF and rated charging voltage of 100 kV, and the storage energy is transmitted by two top and bottom parallel aluminum plates insulated by twelve layers of polyester film with total thickness of 1.2 mm. Between capacitor bank and chamber, there are 72 peaking capacitors with total capacitance of 7.2 μF and rated voltage of 120 kV in parallel, which are connected with the capacitor bank in parallel. Before the load, there is a group of seven secondary self-breaking down switches connected with the total circuit in series. The peaking capacitors and secondary switches are used to shape the discharging current waveforms. For short-circuit, the peak current of discharging can be up to 3 ~ 4 MA and rise time varies from 470 ns to 600 ns when the charging voltages of the generator are from 75 kV to 85 kV. With CQ-4 generator, some quasi-isentropic compression experiments under ramp wave loadings are done to demonstrate the ability of CQ-4 generator. And some experiments of launching high velocity flyer plates are also done on CQ-4. The experimental results show that ramp wave loading pressure of several tens of GPa on copper and aluminum samples can be realized and the velocity of aluminum flyer plate with size of 10 mm × 6 mm × 0.35 mm can be accelerated to about 11 km/s and the velocity of aluminum flyer plate with size of 10 mm × 6 mm × 0.6 mm can be up to about 9 km/s, which show that CQ-4 is a good and versatile tool to realize ramp wave loading and shock compression for shock physics.

  5. A 4 MA, 500 ns pulsed power generator CQ-4 for characterization of material behaviors under ramp wave loading

    Science.gov (United States)

    Wang, Guiji; Luo, Binqiang; Zhang, Xuping; Zhao, Jianheng; Sun, Chengwei; Tan, Fuli; Chong, Tao; Mo, Jianjun; Wu, Gang; Tao, Yanhui

    2013-01-01

    A pulsed power generator CQ-4 was developed to characterize dynamic behaviors of materials under ramp wave loading, and to launch high velocity flyer plates for shock compression and hypervelocity impact experiments of materials and structures at Institute of Fluid Physics, China Academy of Engineering Physics. CQ-4 is composed of twenty capacitor and primary discharge switch modules with total capacitance of 32μF and rated charging voltage of 100 kV, and the storage energy is transmitted by two top and bottom parallel aluminum plates insulated by twelve layers of polyester film with total thickness of 1.2 mm. Between capacitor bank and chamber, there are 72 peaking capacitors with total capacitance of 7.2 μF and rated voltage of 120 kV in parallel, which are connected with the capacitor bank in parallel. Before the load, there is a group of seven secondary self-breaking down switches connected with the total circuit in series. The peaking capacitors and secondary switches are used to shape the discharging current waveforms. For short-circuit, the peak current of discharging can be up to 3 ˜ 4 MA and rise time varies from 470 ns to 600 ns when the charging voltages of the generator are from 75 kV to 85 kV. With CQ-4 generator, some quasi-isentropic compression experiments under ramp wave loadings are done to demonstrate the ability of CQ-4 generator. And some experiments of launching high velocity flyer plates are also done on CQ-4. The experimental results show that ramp wave loading pressure of several tens of GPa on copper and aluminum samples can be realized and the velocity of aluminum flyer plate with size of 10 mm × 6 mm × 0.35 mm can be accelerated to about 11 km/s and the velocity of aluminum flyer plate with size of 10 mm × 6 mm × 0.6 mm can be up to about 9 km/s, which show that CQ-4 is a good and versatile tool to realize ramp wave loading and shock compression for shock physics.

  6. AlGaN/GaN-on-Si monolithic power-switching device with integrated gate current booster

    Science.gov (United States)

    Han, Sang-Woo; Jo, Min-Gi; Kim, Hyungtak; Cho, Chun-Hyung; Cha, Ho-Young

    2017-08-01

    This study investigates the effects of a monolithic gate current booster integrated with an AlGaN/GaN-on-Si power-switching device. The integrated gate current booster was implemented by a single-stage inverter topology consisting of a recessed normally-off AlGaN/GaN MOS-HFET and a mesa resistor. The monolithically integrated gate current booster in a switching FET eliminated the parasitic elements caused by external interconnection and enabled fast switching operation. The gate charging and discharging currents were boosted by the integrated inverter, which significantly reduced both rise and fall times: the rise time was reduced from 626 to 41.26 ns, while the fall time was reduced from 554 to 42.19 ns by the single-stage inverter. When the packaged monolithic power chip was tested under 1 MHz hard-switching operation with VDD = 200 V, the switching loss was found to have been drastically reduced, from 5.27 to 0.55 W.

  7. The calculation of the YALINA BOOSTER zero power sub critical assembly driven by external neutron sources: Brazillian contribution

    International Nuclear Information System (INIS)

    Carluccio, Thiago; Rossi, Pedro Carlos Russo; Maiorino, Jose Rubens

    2011-01-01

    The YALINA-Booster is an experimental zero power Accelerator Driven Reactor (ADS), which consists of a sub-critical assemby driven by external neutron sources. It has a fast spectrum booster zone in the center, surrounded by a thermal one. The sub-critical core is driven by external neutron sources. Several experiments have been proposed in the framework of IAEA Coordinated Reserch Project (CRP) on ADS. This work shows results obtained by IPEN modelling and simulating experiments proposed at CRP, using the MCNP code. The comparison among our results, the experimental one and the results obtained by other participants is being done by CRP coordinators. This coolaborative work has an important role in the qualification and improvement of calculational methodologies.

  8. Power ramp limitation and frequency support in large scale PVPPs without storage

    DEFF Research Database (Denmark)

    Craciun, Bogdan-Ionut; Spataru, Sergiu; Kerekes, Tamas

    2013-01-01

    Photovoltaic (PV) power generation started to become a mature technology and large scale PV Power Plants (PVPPs) operating in Maximum Power Point Tracking (MPPT) are not a solution anymore. During changes in the meteorological conditions, PVPPs output is directly influenced creating high power...

  9. Technical assessment of electric heat boosters in low-temperature district heating based on combined heat and power analysis

    DEFF Research Database (Denmark)

    Cai, Hanmin; You, Shi; Wang, Jiawei

    2018-01-01

    This paper provides a technical assessment of electric heat boosters (EHBs) in low-energy districts. The analysis is based on a hypothetical district with 23 terraced single-family houses supplied by both a lowtemperature district heating (LTDH) network and a low-voltage network (LVN). Two case...... studies are provided to show the active role of EHBs in a smart energy system (SES). The first case compares annual heat and power flow analyses for LTDH at five supply temperature levels, focusing on their impacts. The results show that district heating network (DHN) losses can be reduced by 35......% if the supply temperature is reduced from 70 C to 50 C, but the LVN peak power will have to be increased by up to 2% using heat boosting. The second case further aggregates EHBs to provide a fuel shift (FS) service for the DHN. The results show that while LVN peak power was increased by up to 4.3%, the basic...

  10. Spectrum analysis of the power line flicker induced by the electrical test of the prototype Booster dipole

    International Nuclear Information System (INIS)

    Meth, M.

    1992-01-01

    Testing of the prototype Booster dipole magnet at full current produced measurable disturbances of the beam position at the National Synchrotron Light Source. Power for the magnet and the NSLS are distributed from three substation transformers at Temple Place. Normally the substation configuration is for two independent 13.8 KV buses, derived from the 69 KV LILCO distribution. The buses are connected through a circuit breaker that is normally open circuited. Power for the magnet test is derived from one of the 13.8 KV buses and power for the NSLS is derived from the second bus. Coupling of the pulsating magnet load and the NSLS is at the 69 KV level. However, on the days that the interference was first observed at the NSLS only one-half of the substation transformers at Temple Place were in service. The 13.8 KV tie breaker was closed and the full substation load was supplied from this common bus. Thus the coupling between the pulsating magnet load and the NSLS was at the 13.8 KV level. Establishing the normal two bus configurations at Temple Place appeared to reduce the disturbance. These events suggested a controlled experiment to measure the magnet power swing and the induced powerline flicker; and from these measurements project the flicker on the lab site generated by the Booster operating at full energy. This experiment could corroborate the validity of the electrical models used in analyzing the power flow from the LILCO power grid and its distribution on the Lab site described in Accelerator Division Technical Note 220

  11. Beam Based RF Voltage Measurements and Longitudinal Beam Tomography at the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Bhat, C. M. [Fermilab; Bhat, S. [Fermilab

    2017-10-19

    Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two decades. Therefore, understanding the Booster in great detail is important as we continue to improve its performance. For example, it is important to know accurately the available RF power in the Booster by carrying out beam-based measurements in order to specify the needed upgrades to the Booster RF system. Since the Booster magnetic field is changing continuously measuring/calibrating the RF voltage is not a trivial task. Here, we present a beam based method for the RF voltage measurements. Data analysis is carried out using computer programs developed in Python and MATLAB. The method presented here is applicable to any RCS which do not have flat-bottom and flat-top in the acceleration magnetic ramps. We have also carried out longitudinal beam tomography at injection and extraction energies with the data used for RF voltage measurements. Beam based RF voltage measurements and beam tomography were never done before for the Fermilab Booster. The results from these investigations will be very useful in future intensity upgrades.

  12. The Control of Fluxes of Electric Power in Networks by Means of Phase-switching Booster Transformers

    Directory of Open Access Journals (Sweden)

    Govorov F.P.

    2016-12-01

    Full Text Available roblems of increasing the efficiency of the operation of electrical networks based on the utilization of booster transformers (BT with electronic control, applied on the base of active elements in smart electric grids of power systems and giving the function of automatic correction of the parameters of the network, assuring the conditions of optimal common operation are studied in the paper. The mathematic model of the processes in the electric networks with booster transformer has been developed; the opportunity of control by means of the phase-switching BT for power fluxes in the networks has been established. It has been shown that for the groups of switching the windings 1-5 of BT occurs additional consumption of power from the supply network, but for the groups 7-11 its recuperation to the load network. Respectively, switching the windings of BT to the group 1-5 assures the shift of load current to the direction of lag, but in the case of switching to the group 7-11 – towards the outrunning. Wherein, for the groups of switching 10-11 and 1-2 one can observe the increasing of the voltage at the output of BT, but for the groups 7-8 and 4-5 it is decreasing. Based on the analysis of the results of research the diagram and constructive models of the transformer have been proposed. The quasi-stationary and transient regimes were investigated and the conditions of reliable operation at these the regimes have been determined. The ways for increasing the efficient common operation for the transformer and network in the case of switching the thyristors into the circuit of the primary winding of the transformer have been proposed.

  13. A Cost-Effective Power Ramp-Rate Control Strategy for Single-Phase Two-Stage Grid-Connected Photovoltaic Systems

    DEFF Research Database (Denmark)

    Sangwongwanich, Ariya; Yang, Yongheng; Blaabjerg, Frede

    2016-01-01

    In the case of a wide-scale adoption of grid-connected Photovoltaic (PV) systems, more fluctuated power will be injected into the grid due to the intermittency of solar PV energy. A sudden change in the PV power can potentially induce grid voltage fluctuations, and thus challenge the stability......-point. Experiments conducted on a 3-kW single-phase two-stage grid-connected PV system have verified that the proposed solution can accomplish fast dynamics, high accuracy, and high robustness in the power ramp-rate control for PV systems....

  14. 47 CFR 73.3572 - Processing of TV broadcast, Class A TV broadcast, low power TV, TV translators, and TV booster...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Processing of TV broadcast, Class A TV broadcast, low power TV, TV translators, and TV booster applications. 73.3572 Section 73.3572... Rules Applicable to All Broadcast Stations § 73.3572 Processing of TV broadcast, Class A TV broadcast...

  15. Computer Aided Stroke-by-Stroke Visualization of Actual and Target Power Allows for Continuously Increasing Ramp Tests on Wind-Braked Rowing Ergometers.

    Science.gov (United States)

    Treff, Gunnar; Winkert, Kay; Machus, Katja; Steinacker, Jürgen M

    2017-10-16

    Ramp tests are continuously increasing exercise tests used for determination of maximal oxygen uptake (⩒O 2 max), which is identifiable by a plateau in ⩒O 2 despite increasing mechanical power output (LOAD). On wind-braked rowing ergometers (RowErg) it is hardly feasible to ensure a continuous increase in LOAD until test termination, because neither resistance nor stroke-frequency are externally adjustable, but depend on the rower. To enable ramp tests on rowing ergometers, we produced visual stroke-by-stroke feedback showing target and actual LOAD to the rower. The software supports automatic test termination (TERM auto ) if LOAD ceases to increase. We aimed to evaluate linearity of the LOAD-increment and calculate the difference between TERM auto and test duration at subjective exhaustion (TERM exhaust ). Twenty-eight highly trained male rowers performed a ramp test until subjective exhaustion on RowErg, targeting an increment of 35W•min -1 . LOAD was measured as work per time via external force and position sensors and visualized on a computer screen. TERM auto was deactivated, but all data were logged. Test duration at TERM exhaust was subsequently compared with virtual test duration at TERM auto calculated from the log files. Regression between time and LOAD was y=167+34.6W (r=.99). Individual correlations ranged from .97 to 1.0. TERM auto caused 12-35s shorter test durations than TERM exhaust in four rowers, leading to underestimation in ⩒O 2 max of 1.2% and 3.7% in two rowers. This setup allows one to perform ramp tests on RowErg with continuously increasing LOAD until TERM auto . In particular cases ⩒O2max might be slightly underestimated at TERM auto .

  16. Immunity booster

    International Nuclear Information System (INIS)

    Stefanescu, Ioan; Titescu, Gheorghe; Tamaian, Radu; Haulica, Ion; Bild, Walther

    2002-01-01

    The immunity booster is, according to its patent description, microbiologically pure water with an D/(D+H) isotopic concentration of 100 ppm, with physical-chemical characteristics similar to those of distilled water. It is obtained by sterilization of a mixture of deuterium depleted water, with a 25 ppm isotopic concentration, with distilled water in a volume ratio of 4:6. Unlike natural immunity boosters (bacterial agents as Bacillus Chalmette-Guerin, Corynebacterium parvum; lipopolysaccharides; human immunoglobulin) or synthetical products (levamysol; isoprinosyne with immunostimulating action), which cause hypersensitivity and shocks, thrill, fever, sickness and the immunity complex disease, the water of 100 ppm D/(D + H) isotopic concentration is a toxicity free product. The testing for immune reaction of the immunity booster led to the following results: - an increase of cell action capacity in the first immunity shielding stage (macrophages), as evidenced by stimulation of a number of essential characterizing parameters, as well as of the phagocytosis capacity, bactericide capacity, and opsonic capacity of serum; - an increase of the number of leucocyte particularly of the granulocyte in peripheral blood, produced especially when medullar toxic agents like caryolysine are used; - it hinders the effect of lowering the number of erythrocytes in peripheral blood produced by experimentally induced chronic inflammation; - an increase of nonspecific immunity defence capacity against specific bacterial aggression of both Gram-positive bacteria (Streptococcus pneumoniae 558 ) and of the Gram-negative ones (Klebsiella pneumoniae 507 ); - an increase of immunity - stimulating activity (proinflamatory), like that of levamisole as evidenced by the test of stimulation of experimentally induced inflammation by means of carrageenan. The following advantages of the immunity booster are stressed: - it is toxicity free and side effect free; - can be orally administrated as

  17. Ram booster

    Science.gov (United States)

    Brand, Vance D. (Inventor); Morgan, Walter Ray (Inventor)

    2011-01-01

    The present invention is a space launch system and method to propel a payload bearing craft into earth orbit. The invention has two, or preferably, three stages. The upper stage has rocket engines capable of carrying a payload to orbit and provides the capability of releasably attaching to the lower, or preferably, middle stage. Similar to the lower stage, the middle stage is a reusable booster stage that employs all air breathing engines, is recoverable, and can be turned-around in a short time between missions.

  18. NSLS-II booster timing system

    International Nuclear Information System (INIS)

    Cheblakov, P.; Karnaev, S.; De Long, J.

    2012-01-01

    NSLS-II light source includes the main storage ring with beam lines and injection part consisting of 200 MeV linac, a full-energy 3 GeV booster synchrotron and two transport lines. The booster timing system is a part of NSLS-II timing system which uses hardware from MicroResearch Finland: Event Generator (EVG) and Event Receivers (EVRs). The booster timing is based on the events coming from NSLS-II EVG: 'Pre-Injection', 'Injection', 'Pre-Extraction', 'Extraction'. These events are referenced to the selected RF bucket of the storage ring and correspond to the first RF bucket of the booster. EVRs provide triggers both for the injection and the extraction pulse devices. EVRs also provide the timing of booster cycle operation and generation of events for cycle-to-cycle updates of pulsed and ramping parameters, and synchronization of the booster beam instrumentation devices. This paper describes the final design of the booster timing system. The timing system functional diagrams and block diagram are presented. (authors)

  19. Climatological attribution of wind power ramp events in East Japan and their probabilistic forecast based on multi-model ensembles downscaled by analog ensemble using self-organizing maps

    Science.gov (United States)

    Ohba, Masamichi; Nohara, Daisuke; Kadokura, Shinji

    2016-04-01

    Severe storms or other extreme weather events can interrupt the spin of wind turbines in large scale that cause unexpected "wind ramp events". In this study, we present an application of self-organizing maps (SOMs) for climatological attribution of the wind ramp events and their probabilistic prediction. The SOM is an automatic data-mining clustering technique, which allows us to summarize a high-dimensional data space in terms of a set of reference vectors. The SOM is applied to analyze and connect the relationship between atmospheric patterns over Japan and wind power generation. SOM is employed on sea level pressure derived from the JRA55 reanalysis over the target area (Tohoku region in Japan), whereby a two-dimensional lattice of weather patterns (WPs) classified during the 1977-2013 period is obtained. To compare with the atmospheric data, the long-term wind power generation is reconstructed by using a high-resolution surface observation network AMeDAS (Automated Meteorological Data Acquisition System) in Japan. Our analysis extracts seven typical WPs, which are linked to frequent occurrences of wind ramp events. Probabilistic forecasts to wind power generation and ramps are conducted by using the obtained SOM. The probability are derived from the multiple SOM lattices based on the matching of output from TIGGE multi-model global forecast to the WPs on the lattices. Since this method effectively takes care of the empirical uncertainties from the historical data, wind power generation and ramp is probabilistically forecasted from the forecasts of global models. The predictability skill of the forecasts for the wind power generation and ramp events show the relatively good skill score under the downscaling technique. It is expected that the results of this study provides better guidance to the user community and contribute to future development of system operation model for the transmission grid operator.

  20. Segmental contributions to sagittal-plane whole-body angular momentum when using powered compared to passive ankle-foot prostheses on ramps.

    Science.gov (United States)

    Pickle, Nathaniel T; Silverman, Anne K; Wilken, Jason M; Fey, Nicholas P

    2017-07-01

    Understanding the effects of an assistive device on dynamic balance is crucial, particularly for robotic leg prostheses. Analyses of dynamic balance commonly evaluate the range of whole-body angular momentum (H). However, the contributions of individual body segments to overall H throughout gait may yield futher insights, specifically for people with transtibial amputation using powered prostheses. We evaluated segment contributions to H using Statistical Parametric Mapping to assess the effects of prosthesis type (powered vs passive) and ramp angle on segmental coordination. The slope main effect was significant in all segments, the prosthesis main effect was significant in the prosthetic leg (device and residuum) and trunk, and the slope by prosthesis interaction effect was significant in the prosthetic leg and trunk. The magnitude of contributions to sagittal-plane H from the prosthetic leg was larger when using the powered prosthesis. The trunk contributed more positive (backward) H after prosthetic leg toe-off when using the powered prosthesis on inclines, similar to the soleus muscle. However, trunk contributions to H on declines were similar when using a powered and passive prosthesis, suggesting that the powered prosthesis may not replicate soleus function when walking downhill. Our novel assessment method evaluated robotic leg prostheses not only based on local joint mechanics, but also considering whole-body biomechanics.

  1. Ramp Management in RHIC

    International Nuclear Information System (INIS)

    Kewisch, J.; Van Zeijts, J.; Peggs, S.; Satogata, T.

    1999-01-01

    In RHIC, magnets and RF cavities are controlled by Wave Form Generators (WFGs), simple real time computers which generate the set points. The WFGs are programmed to change set points from one state to another in a synchrotronized way. Such transition is called a ''Ramp'' and consists of a sequence of ''stepping stones'' which contain the set point of every WFG controlled device at a point in time. An appropriate interpolation defines the set points between these stepping stones. This report describes the implementation of the ramp system. The user interface, tools to create and modify ramps, interaction with modeling tools and measurements and correction programs are discussed

  2. Meniscal Ramp Lesions

    Science.gov (United States)

    Chahla, Jorge; Dean, Chase S.; Moatshe, Gilbert; Mitchell, Justin J.; Cram, Tyler R.; Yacuzzi, Carlos; LaPrade, Robert F.

    2016-01-01

    Meniscal ramp lesions are more frequently associated with anterior cruciate ligament (ACL) injuries than previously recognized. Some authors suggest that this entity results from disruption of the meniscotibial ligaments of the posterior horn of the medial meniscus, whereas others support the idea that it is created by a tear of the peripheral attachment of the posterior horn of the medial meniscus. Magnetic resonance imaging (MRI) scans have been reported to have a low sensitivity, and consequently, ramp lesions often go undiagnosed. Therefore, to rule out a ramp lesion, an arthroscopic evaluation with probing of the posterior horn of the medial meniscus should be performed. Several treatment options have been reported, including nonsurgical management, inside-out meniscal repair, or all-inside meniscal repair. In cases of isolated ramp lesions, a standard meniscal repair rehabilitation protocol should be followed. However, when a concomitant ACL reconstruction (ACLR) is performed, the rehabilitation should follow the designated ACLR postoperative protocol. The purpose of this article was to review the current literature regarding meniscal ramp lesions and summarize the pertinent anatomy, biomechanics, diagnostic strategies, recommended treatment options, and postoperative protocol. PMID:27504467

  3. Resistors Improve Ramp Linearity

    Science.gov (United States)

    Kleinberg, L. L.

    1982-01-01

    Simple modification to bootstrap ramp generator gives more linear output over longer sweep times. New circuit adds just two resistors, one of which is adjustable. Modification cancels nonlinearities due to variations in load on charging capacitor and due to changes in charging current as the voltage across capacitor increases.

  4. Automated tuning of the advanced photon source booster synchrotron

    International Nuclear Information System (INIS)

    Biedron, S.G.; Milton, S.V.

    1997-01-01

    The acceleration cycle of the Advanced Photon Source (APS) booster synchrotron is completed within 223 ms and is repeated at 2 Hz. Unless properly corrected, transverse and longitudinal injection errors can lead to inefficient booster performance. In order to simplify daily operation, automated tuning methods have been developed. Through the use of beam position monitor (BPM) reading, transfer line corrector magnets, magnet ramp timing, and empirically determined response functions, the injection process is optimized by correcting the first turn trajectory to the measured closed orbit. These tuning algorithms and their implementation are described here along with an evaluation of their performance

  5. PS Booster - Festive colloquium

    CERN Multimedia

    2012-01-01

    A festive colloquium will be held to celebrate the 40th anniversary of the PS Booster on Friday, 28 September at 2 p.m. in the CERN council chamber. The meeting will be open to everybody. Read more on the PS Booster in the CERN Bulletin and in the CERN Courier.

  6. BROOKHAVEN: Booster boost

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    After three months of intensive dedicated machine studies, Brookhaven's new Booster accelerated 5 x 10 13 protons over four cycles, about 85% of the design intensity. This was made possible by careful matching of Linac beam into the Booster and by extensive resonance stop band corrections implemented during Booster acceleration. The best single cycle injection into the AGS Alternating Gradient Synchrotron was 1.14 x 10 13 protons from the Booster. 1.05 x 10 13 protons were kept in the AGS, a 92% combined efficiency of extraction, transfer, and injection. The maximum injected 1994 shutdown period, enabling the 1994 physics run to make use of the full Booster intensity and go for the stated AGS objective of 4x10 13 protons per pulse

  7. RAMP 2003 summary report

    International Nuclear Information System (INIS)

    Moats, D.; Stanley, S.; Abundo, L.; Theriault, C.; Bruce, G.; Gibbons, W.

    2003-01-01

    This report summarized key findings of the 2003 Regional Aquatics Monitoring Program (RAMP) annual technical report. RAMP was formed in 1997 to monitor the health of rivers and lakes in the oil sands region of Alberta and to assess the potential impacts of oil sands development. It was also developed to collect baseline data and compare it with environmental assessment predictions made by oil sand operators in the Wood Buffalo region. In 2003, RAMP monitored fish and fish habitats in the oil sands region, as well as water and sediment quality. Data was also collected on benthic invertebrates; wetlands vegetation; lake acidification data; hydrology; and climate. Studies focused on the Athabasca River and its tributaries; smaller tributaries of the Muskeg River; the North Steepbank River; and the Christina River. Data from wetlands in the vicinity of current and proposed oil sands developments was collected together with data from 50 acid-sensitive lakes in northeastern Alberta. RAMP monitoring activities in 2003 increased in response to increased resource exploitation activities in the region. Information from climate and hydrologic monitoring stations was analyzed in order to model changes resulting from oil sands development. Water levels were monitored to measure discharge, ice thickness, and water depth of selected lakes and streams. Water and sediment quality analyses were conducted to establish the physical and chemical features of the water bodies in the RAMP study area. The analyses suggested that water quality was consistent with previous years. Inputs from tributaries in the oil sands region did not obviously impact water quality in the Athabasca River. Higher levels of polycyclic aromatic hydrocarbons (PAHs) were noted at stations in the oil sands regions. Benthic communities monitored in the study were within expected ranges for undisturbed communities in the region. A RAMP fish monitoring program indicated that spawning runs in the Muskeg River have

  8. The CEA-FRAGEMA ramp test programme for the study of the effect of power cycling on PCI at high burn-up

    International Nuclear Information System (INIS)

    Joseph, J.; Atabek, R.; Trotabas, M.

    1983-01-01

    The ramp test programme developed jointly by FRAGEMA and CEA is presented. Today, more than thirty PWR fuel rods have been ramp-tested in experimental reactors SILOE and OSIRIS. Nineteen fuel rods, named 'PRISCA', were base irradiated in BR3 and twelve fuel rods have been refabricated in hot cell by the FABRICE technique. The average fuel burn-up lies between 11 GWd.tU -1 and 46 GWd.tU -1 . In the major cases, the flux profile, during ramp-test, was decentred with respect to the base irradiated flux, and allows to obtain much more information than with a centred flux profile. The failure threshold was established under a set of more than thirty fuel rods of various designs. In particular, the post irradiation examinations allow to locate all rupture locations and thus to define precisely the threshold condition for failure of fuel rods. As an example, the results obtained in the PRISCA 109 experiments are presented. The refabricated fuel rods FABRICE behave identically, with regard to PCI, rather than PRISCA rods. An example of load follow transient in a PWR reactor is presented, and indicates any risk of failure due to PCI. (author)

  9. Understanding Micro-Ramp Control for Shock Boundary Layer Interactions

    National Research Council Canada - National Science Library

    Loth, Eric; Lee, Sang

    2008-01-01

    .... Of several candidate micro-VGs, micro-ramps have been found to significantly impact shock boundary layer interaction flows, while being cost-effective, physically robust, and requiring no power sources...

  10. 47 CFR 90.219 - Use of signal boosters.

    Science.gov (United States)

    2010-10-01

    ... effective radiated power (ERP) of the unit to a maximum of 5 watts under all conditions. Class B broadband signal boosters are limited to 5 watts ERP for each authorized frequency that the booster is designed to..., tunnels, underground areas, etc., or in remote areas, i.e., areas where there is little or no risk of...

  11. CEPC booster design study

    Science.gov (United States)

    Bian, Tianjian; Gao, Jie; Zhang, Chuang; Cui, Xiao-Hao; Wang, Yi-Wei; Bai, Sha; Su, Feng; Wang, Dou; Cai, Yun-Hai; Koratzinos, Michael

    2017-12-01

    In September 2012, Chinese scientists proposed a Circular Electron Positron Collider (CEPC) in China at 240 GeV center-of-mass energy for Higgs studies. The booster provides 120 GeV electron and positron beams to the CEPC collider for top-up injection at 0.1 Hz. The design of the full energy booster ring of the CEPC is a challenge. The ejected beam energy is 120 GeV and the injected beam energy is 6 GeV. In this paper we describe two alternative schemes, the wiggler bend scheme and the normal bend scheme. For the wiggler bend scheme, we propose to operate the booster ring as a large wiggler at low energy and as a normal ring at high energy to avoid the problem of very low dipole magnet fields. For the normal bend scheme, we implement the orbit correction to correct the earth field.

  12. Accelerating RF cavity of the Booster

    CERN Multimedia

    CERN PhotoLab

    1983-01-01

    Each of the 4 PS Booster rings has a single accelerating cavity.It consists of 2 quarter-wave ferrite-loaded resonators. 2 figure-of-eight loops tune the frequency throughout the accelerating cycle, from 3 to 8 MHz (from 50 MeV at injection to the original Booster energy of 800 MeV, 2 GeV today). The cavities have a flat design, to fit the ring-to-ring distance of 36 cm, and are forced-air cooled. The 2 round objects in the front-compartments are the final-stage power-tetrodes. See also 8111095.

  13. Using the transverse digital damper as a real-time tune monitor for the Booster synchrotron at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, N.; Lysenko, O.; /FERMILAB

    2011-08-01

    The Fermilab Booster is a fast ramping (15Hz) synchrotron which accelerates protons from 400MeV to 8GeV. During commissioning of a transverse digital damper system, it was shown that the damper could provide a measurement of the machine tune throughout the cycle by exciting just 1 of the 84 bunches with minimal impact on the machine operation. The algorithms used to make the measurement have been incorporated into the damper FPGA firmware allowing for real-time tune monitoring of all Booster cycles. A new Booster tune monitor was implemented in the digital damper which has minimal impact on the Booster operation. The tune measures the tunes in two planes over the energy ramping cycle with an accuracy of 0.01 in real time.

  14. Booster parameter list

    International Nuclear Information System (INIS)

    Parsa, Z.

    1986-10-01

    The AGS Booster is designed to be an intermediate synchrotron injector for the AGS, capable of accelerating protons from 200 MeV to 1.5 GeV. The parameters listed include beam and operational parameters and lattice parameters, as well as parameters pertaining to the accelerator's magnets, vacuum system, radio frequency acceleration system, and the tunnel. 60 refs., 41 figs

  15. The use of real-time off-site observations as a methodology for increasing forecast skill in prediction of large wind power ramps one or more hours ahead of their impact on a wind plant.

    Energy Technology Data Exchange (ETDEWEB)

    Martin Wilde, Principal Investigator

    2012-12-31

    ABSTRACT Application of Real-Time Offsite Measurements in Improved Short-Term Wind Ramp Prediction Skill Improved forecasting performance immediately preceding wind ramp events is of preeminent concern to most wind energy companies, system operators, and balancing authorities. The value of near real-time hub height-level wind data and more general meteorological measurements to short-term wind power forecasting is well understood. For some sites, access to onsite measured wind data - even historical - can reduce forecast error in the short-range to medium-range horizons by as much as 50%. Unfortunately, valuable free-stream wind measurements at tall tower are not typically available at most wind plants, thereby forcing wind forecasters to rely upon wind measurements below hub height and/or turbine nacelle anemometry. Free-stream measurements can be appropriately scaled to hub-height levels, using existing empirically-derived relationships that account for surface roughness and turbulence. But there is large uncertainty in these relationships for a given time of day and state of the boundary layer. Alternatively, forecasts can rely entirely on turbine anemometry measurements, though such measurements are themselves subject to wake effects that are not stationary. The void in free-stream hub-height level measurements of wind can be filled by remote sensing (e.g., sodar, lidar, and radar). However, the expense of such equipment may not be sustainable. There is a growing market for traditional anemometry on tall tower networks, maintained by third parties to the forecasting process (i.e., independent of forecasters and the forecast users). This study examines the value of offsite tall-tower data from the WINDataNOW Technology network for short-horizon wind power predictions at a wind farm in northern Montana. The presentation shall describe successful physical and statistical techniques for its application and the practicality of its application in an operational

  16. Summary of Booster Development and Qualification Report

    Energy Technology Data Exchange (ETDEWEB)

    Francois, Elizabeth G. [Los Alamos National Laboratory; Harry, Herbert H. [Los Alamos National Laboratory; Hartline, Ernest L. [Los Alamos National Laboratory; Hooks, Daniel E. [Los Alamos National Laboratory; Johnson, Carl E. [Los Alamos National Laboratory; Morris, John S. [Los Alamos National Laboratory; Novak, Alan M. [Los Alamos National Laboratory; Ramos, Kyle J. [Los Alamos National Laboratory; Sanders, Victor E. [Los Alamos National Laboratory; Scovel, Christina A. [Los Alamos National Laboratory; Lorenz, Thomas [LLNL; Wright, Mark [AWE; Botcher, Tod [PANTEX; Marx, Erin [NSWC-IHDIV; Gibson, Kevin [NSWC-IHDIV

    2012-06-21

    This report outlines booster development work done at Los Alamos National Laboratory from 2007 to present. The booster is a critical link in the initiation train of explosive assemblies, from complex devices like nuclear weapons to conventional munitions. The booster bridges the gap from a small, relatively sensitive detonator to an insensitive, but massive, main charge. The movement throughout the explosives development community is to use more and more insensitive explosive components. With that, more energy is needed out of the booster. It has to initiate reliably, promptly, powerfully and safely. This report is divided into four sections. The first provides a summary of a collaborative effort between LANL, LLNL, and AWE to identify candidate materials and uniformly develop a testing plan for new boosters. Important parameters and the tests required to measure them were defined. The nature of the collaboration and the specific goals of the participating partners has changed over time, but the booster development plan stands on its own merit as a complete description of the test protocol necessary to compare and qualify booster materials, and is discussed in its entirety in this report. The second section describes a project, which began in 2009 with the Department of Defense to develop replacement booster formulations for PBXN-7. Replacement of PBXN-7 was necessary because it contained Triaminotrinitrobenzene (TATB), which was becoming unavailable to the DoD and because it contained Cyclotrimethylenetrinitramine (RDX), which was sensitive and toxic. A LANL-developed explosive, Diaminoazoxyfurazan (DAAF), was an important candidate. This project required any replacement formulation be a drop-in replacement in existing munitions. This project was timely, in that it made use of the collaborative booster development project, and had the additional constraint of matching shock sensitivity. Additionally it needed to be a safety improvement, and a performance

  17. Dryden B-52 Launch Aircraft on Dryden Ramp

    Science.gov (United States)

    1996-01-01

    NASA's venerable B-52 mothership sits on the ramp in front of the Dryden Flight Research Center, Edwards, California. Over the course of more than 40 years, the B-52 launched numerous experimental aircraft, ranging from the X-15 to the X-38, and was also used as a flying testbed for a variety of other research projects. NASA B-52, Tail Number 008, is an air launch carrier aircraft, 'mothership,' as well as a research aircraft platform that has been used on a variety of research projects. The aircraft, a 'B' model built in 1952 and first flown on June 11, 1955, is the oldest B-52 in flying status and has been used on some of the most significant research projects in aerospace history. Some of the significant projects supported by B-52 008 include the X-15, the lifting bodies, HiMAT (highly maneuverable aircraft technology), Pegasus, validation of parachute systems developed for the space shuttle program (solid-rocket-booster recovery system and the orbiter drag chute system), and the X-38. The B-52 served as the launch vehicle on 106 X-15 flights and flew a total of 159 captive-carry and launch missions in support of that program from June 1959 to October 1968. Information gained from the highly successful X-15 program contributed to the Mercury, Gemini, and Apollo human spaceflight programs as well as space shuttle development. Between 1966 and 1975, the B-52 served as the launch aircraft for 127 of the 144 wingless lifting body flights. In the 1970s and 1980s, the B-52 was the launch aircraft for several aircraft at what is now the Dryden Flight Research Center, Edwards, California, to study spin-stall, high-angle-of attack, and maneuvering characteristics. These included the 3/8-scale F-15/spin research vehicle (SRV), the HiMAT (Highly Maneuverable Aircraft Technology) research vehicle, and the DAST (drones for aerodynamic and structural testing). The aircraft supported the development of parachute recovery systems used to recover the space shuttle solid rocket

  18. Mathematical modeling of compression processes in air-driven boosters

    International Nuclear Information System (INIS)

    Li Zeyu; Zhao Yuanyang; Li Liansheng; Shu Pengcheng

    2007-01-01

    The compressed air in normal pressure is used as the source of power of the air-driven booster. The continuous working of air-driven boosters relies on the difference of surface area between driven piston and driving piston, i.e., the different forces acting on the pistons. When the working surface area of the driving piston for providing power is greater than that of the driven piston for compressing gas, the gas in compression chamber will be compressed. On the basis of the first law of thermodynamics, the motion regulation of piston is analyzed and the mathematical model of compression processes is set up. Giving a calculating example, the vary trends of gas pressure and pistons' move in working process of booster have been gotten. The change of parameters at different working conditions is also calculated and compared. And the corresponding results can be referred in the design of air-driven boosters

  19. Non-Cooperative Regulation Coordination Based on Game Theory for Wind Farm Clusters during Ramping Events

    DEFF Research Database (Denmark)

    Qi, Yongzhi; Liu, Yutian; Wu, Qiuwei

    2017-01-01

    With increasing penetration of wind power in power systems, it is important to track scheduled wind power output as much as possible during ramping events to ensure security of the system. In this paper, a non‐cooperative coordination strategy based on the game theory is proposed for the regulation...... of wind farm clusters (WFCs) in order to track scheduled wind power of the WFC during ramping events. In the proposed strategy, a non‐cooperative game is formulated and wind farms compete to provide regulation to the WFC during ramping events. A regulation revenue function is proposed to evaluate...

  20. Twin Cities ramp meter evaluation : executive summary

    Science.gov (United States)

    2001-02-01

    This report details the results of a study on the traffic flow and safety impacts of ramp metering. The study served two important public purposes. 1. It thoroughly documented the benefits resulting from ramp metering to traffic operations and relate...

  1. Evaluation of the thermal-mechanical performance of fuel rods of a BWR during a power ramp using the FUELSIM code

    International Nuclear Information System (INIS)

    Pantoja C, R.

    2010-01-01

    To avoid the risk to environment due to release of radioactive material, because of occurrence of an accident, it is the priority of the design and performance of the diverse systems of safety of a commercial nuclear power plant. The safety of nuclear power plants requires, therefore, monitoring those parameters having some direct or indirect effect on safety. The thermal limits are values set for those parameters considered having most impact on the safe operation of a nuclear power reactor. Some thermal limits monitoring requires the thermal-mechanical analysis of the rods containing the nuclear fuel. The fuel rod thermal-mechanical behavior under irradiation is a complex process in which there exists a great deal of interrelated physical and chemical phenomena, so that the fuel rod performance analysis in the core of a nuclear power reactor is generally accomplished by using computer codes, which integrate several of the phenomena that are expected to occur during the lifetime of the fuel rod in the core. The main application of the thermal-mechanical analysis codes is the prediction of occurrence of conditions and/or phenomena that could lead to the deterioration or even mechanical failure of the fuel rod cladding, as, for example, the pellet-cladding interaction. In the operation of a nuclear power reactor, fuel preconditioning operations refer to the operational procedures employed to reduce the fuel rod failure probability due to fuel-cladding interaction, specially during reactor startup. Preconditioning simulations are therefore necessary to determine in advance limit values for the power that can be generated in a fuel rod, and thus avoiding any rod damage. In this work, a first analysis of the thermal-mechanical performance of typical fuel rods used in nuclear reactors of the type BWR 5/6, as those two nuclear reactors in Laguna Verde, Veracruz, is performed. This study includes two types of fuel rods: one from a fuel assembly design with an array 8 x 8

  2. Electrical characteristics of the SSC Low-Energy Booster Magnetic system

    International Nuclear Information System (INIS)

    Young, A.; Shafer, B.E.

    1993-01-01

    The purpose of this paper is to review the electrical design of the magnet system for the Superconducting Super Collider (SSC) Low-Energy Booster (LEB). The primary operating mode of the LEB is as a 10-Hz rapid-cycling proton synchrotron. In this mode, capacitor banks are used to make the entire magnet circuit resonant at 10 Hz. This resonant system thus eliminates the requirement of having to provide (and recover) a large amount of reactive power. The primary focus of this paper is to analyze the electrical properties of the magnet system. In addition to the 10-Hz mode, the magnet system is capable of operating as a 1-Hz ramped proton synchrotron, with flat open-quotes front porchesclose quotes and open-quotes flattopsclose quotes for injection and extraction. This mode is initiated through bypassing the choke-capacitor system and exciting the magnet system with a SCR power supply using predetermined waveforms. Both these operating modes (10 Hz and 1 Hz) are analyzed using SPICE (Version 3E)

  3. Global Decoupling on the RHIC Ramp

    CERN Document Server

    Luo, Yun; Della Penna, Al; Fischer, Wolfram; Laster, Jonathan S; Marusic, Al; Pilat, Fulvia Caterina; Roser, Thomas; Trbojevic, Dejan

    2005-01-01

    The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC). In the polarized proton run, the betatron tunes are required to keep almost constant on the ramp to avoid spin resonance line crossing and the beam polarization loss. Some possible correction schemes on the ramp, like three-ramp correction, the coupling amplitude modulation and the coupling phase modulaxtion, have been found. The principles of these schemes are shortly reviewed and compared. Operational results of their applications on the RHIC ramps are given.

  4. Ramp Metering Influence on Freeway Operational Safety near On-ramp Exits

    Directory of Open Access Journals (Sweden)

    Chiu Liu, PhD, PE, PTOE

    2013-06-01

    Full Text Available Ramp metering has been widely installed in urban areas where congestion on a freeway or an expressway may occur recurrently during weekday peak periods to enhance mainline throughput and reduce system-wide delay. These operational benefits may also help reduce vehicular emissions and improve air quality in urban areas. However, the impact on traffic safety due to ramp metering hasn't been explored in details before. Supported by physical understanding and arguments, we characterize the ramp metering influence on freeway safety by examining vehicular collisions near on-ramp exits within the ramp meter operating hours before and after the activation of the ramp metering. Collisions for a sample of 19 operating ramp meters along several freeways in northern California were collected and organized to show that ramp metering can help reduce freeway collisions at the vicinity of on-ramp exits. It was found that the average reductions on freeway collisions in the vicinity of an on-ramp exit are around 36%. Although most of the reduced collisions belong to the property damage only category, a 36% reduction shows the significant safety benefit of ramp metering. The traffic congestion induced by each collision, especially during peak hours when ramp metering is in operation, could last for an hour or two. Consequently, ramp metering must be contributing to the reduction of non-recurrent congestion in addition to mitigating recurrent congestion, which is better documented. This study strongly supports the implementation of ramp metering in California.

  5. Estimating the Probability of Wind Ramping Events: A Data-driven Approach

    OpenAIRE

    Wang, Cheng; Wei, Wei; Wang, Jianhui; Qiu, Feng

    2016-01-01

    This letter proposes a data-driven method for estimating the probability of wind ramping events without exploiting the exact probability distribution function (PDF) of wind power. Actual wind data validates the proposed method.

  6. Conceptual design report: superconducting booster

    International Nuclear Information System (INIS)

    1983-01-01

    The Superconducting Booster project includes the construction of a new high-voltage injector and buncher for the existing tandem, a magnetic transport system, an rf linac with superconducting resonators, and a rebuncher-debuncher. The booster will fit in existing space so that a new building is not required. The layout of the accelerator is given in Fig. I-1. The University of Washington is contributing approximately $1 M to this project

  7. Booster LINAC project: introduction

    International Nuclear Information System (INIS)

    Storm, D.W.

    1984-01-01

    During the past year the DOE awarded a contract to build the superconducting booster proposed in 1982. Although the majority of the funds ($8M) of the project are construction funds included in the DOE contract, part of the project is to be done with state funds ($1.03M) and part with the operating funds (3 FTE personnel as well as costs of prototyping the resonators). Therefore it is appropriate to outline the progress in this report. The overall design was changed somewhat from that described in last year's Annual Report. Instead of 12 split ring resonators optimized for beta = 0.10 and 12 for beta = 0.16, the author has chosen to use 16 quarter wave resonators optimized for beta = 0.09 and 16 for beta = 0.18. The quarter wave resonators, which have two accelerating gaps instead of the three of the split rings, have a wider transit time factor, which is favorable for accelerating a broader range of particle masses. The quarter wave resonators are to be built of lead plated copper, following the design of Ben-Zvi and Brennan

  8. Solid Rocket Booster-Illustration

    Science.gov (United States)

    1977-01-01

    This illustration is a cutaway of the solid rocket booster (SRB) sections with callouts. The Shuttle's two SRB's are the largest solids ever built and the first designed for refurbishment and reuse. Standing nearly 150-feet high, the twin boosters provide the majority of thrust for the first two minutes of flight, about 5.8 million pounds, augmenting the Shuttle's main propulsion system during liftoff. The major design drivers for the solid rocket motors (SRM's) were high thrust and reuse. The desired thrust was achieved by using state-of-the-art solid propellant and by using a long cylindrical motor with a specific core design that allows the propellant to burn in a carefully controlled marner. At burnout, the boosters separate from the external tank and drop by parachute to the ocean for recovery and subsequent refurbishment. The boosters are designed to survive water impact at almost 60 miles per hour, maintain flotation with minimal damage, and preclude corrosion of the hardware exposed to the harsh seawater environment. Under the project management of the Marshall Space Flight Center, the SRB's are assembled and refurbished by the United Space Boosters. The SRM's are provided by the Morton Thiokol Corporation.

  9. Effect of PWR Re-start ramp rate on pellet-cladding interactions

    International Nuclear Information System (INIS)

    Yagnik, S.K.; Chang, B.C.; Sunderland, D.J.

    2005-01-01

    To mitigate pellet-cladding interaction (PCI) leading to fuel rod failures, fuel suppliers specify reactor power ramp rate limitations during reactor start-up after an outage. Typical re-start ramp rates are restricted and range between 3-4% per hour of full reactor power above a threshold power level. Relaxation of threshold power and ramp rate restrictions has the potential to improve plant economics. The paper will compare known re-start power ascension procedures employed in the US, German, French and Korean PWRs after a refuelling outage. A technical basis for optimising power ascension procedures during reactor start-up can be developed using analytical modelling. The main objective of the modelling is to determine the potential for PCI failure for various combinations of threshold power levels and ramp rate levels. A key element of our analysis is to estimate the decrease in margin to cladding failure by ISCC based on a time-temperature-stress failure criterion fashioned Act a cumulative cladding damage index. The analysis approach and the cladding damage model will be described and the results from three case studies based on the FALCON fuel rod behaviour code will be reported. We conclude that the PCI behaviour is more affected by ramp rate and threshold power than by the fuel design and that the fuel power history is the most important parameter. (authors)

  10. Numerical Study of Quench Protection for Fast-Ramping Accelerator Magnets

    CERN Document Server

    Schwerg, N; Mess, K-N; Russenschuck, S

    2009-01-01

    The quench module of the ROXIE field computation program has been presented at previous conferences. In this paper we discuss recently implemented features that allow quench simulation of fast-ramping superconducting magnets. As the reliability of quench detection during the ramps depends on the signal to noise ratio, we simulate the influence of detection thresholds and the propagation of undetected quenches during the ramps. We also study the effect of an increased copper content and the feasibility of a self-protected magnet surviving a powering cycle with an undetected quench and without quench heater firing or energy-extraction system.

  11. Radiation-hard mid-power booster optical fiber amplifiers for high-speed digital and analogue satellite laser communication links

    Science.gov (United States)

    Stampoulidis, L.; Kehayas, E.; Stevens, G.; Henwood-Moroney, L.; Hosking, P.; Robertson, A.

    2017-11-01

    Optical laser communications (OLC) has been identified as the technology to enable high-data rate, secure links between and within satellites, as well as between satellites and ground stations with decreased mass, size, and electrical power compared to traditional RF technology.

  12. IFPE/KOLA-3-MIR-RAMP, KOLA-3 MIR test temperature during ramp, FGR and pressure at EOL, Bu up to 55 MWd/kg UO2

    International Nuclear Information System (INIS)

    Turnbull, J.A.

    2006-01-01

    Description: In 1996-97 a number of tests with the high burn up VVER-440 fuel under transient conditions were carried out in the MIR reactor (SSC RIAR). Fuel rods that had operated under normal operating conditions at the Kola NPP Unit 3 during 4- and 5 fuel cycles up to the maximum burnup of about 50 and 60 MWd/kgU were tested. The tests were carried out under single ramp conditions (RAMP experiment) and step by step power increase (FGR-1 and FGR-2 experiments). The objective of the experiments was to determine the power ramp influence on fuel rods state, to evaluate FGR induced-threshold linear power values, to study dependence between the linear power, temperature, structure and properties of the fuel. Nine re-fabricated fuel rods were tested in the above mentioned tests. All of these re-fabricated fuel rods (RFRs) were cut from fuel rods of the FA's 198 and 222. The positions of the RFRs, the average linear heat rate of the FAs 198 and 222 fuel rods during base irradiation, the operating conditions of the FA-198 and FA-222 fuel rods, details of the design values of the FA's 198 and 222 fuel rods and the main operating conditions of the Kola 3 during 5-9 fuel cycles are provided. RAMP test: The test rig with RFRs was installed for testing in the research reactor MIR in February 1996. During the RAMP experiment 3 non-equipped RFRs were tested under power ramp conditions. The RAMP test was divided into 3 stages: stage 1 - irradiation at initial power level (duration - ∼346 hours); stage 2 - power ramp from initial to maximal level (duration - ∼23 min); stage 3 - hold stage after ramp (duration - ∼107 hours). FGR-1 test: The FGR-1 experiment started in March 1996 and finished in April 1996. The test rig included three RFRs. Two were instrumented with pressure sensors while the third was not instrumented. FGR-2 test: The FGR-2 experiment was the second of the tests series directed to investigation of the thermal physical behaviour of VVER fuel at the different

  13. Tha AGS Booster high frequency rf system

    International Nuclear Information System (INIS)

    Sanders, R.; Cameron, P.; Damn, R.

    1988-01-01

    A high level rf system, including a power amplifier and cavity has been designed for the AGS Booster. It covers a frequency range of 2.4 to 4.2 Mhz and will be used to accelerate high intensity proton, and low intensity polarized proton beams to 1.5 GeV and heavy ions to 0.35 GeV per nucleon. A total accelerating voltage of up to 90kV will be provided by two cavities, each having two gaps. The internally cross-coupled, pushpull cavities are driven by an adjacently located power amplifier. In order to accommodate the high beam intensity, up to 0.75 /times/ 10 13 protons per bunch, a low plate resistance power tetrode is used. The tube anode is magnetically coupled to one of the cavity's two paralleled cells. The amplifier is a grounded cathode configuration driven by a remotely located solid state amplifier

  14. The AGS booster high frequency rf system

    International Nuclear Information System (INIS)

    Sanders, R.; Cameron, P.; Kamn, R.; Goldman, M.; Jablonski, E.; Keane, J.; McNerney, A.; Meth, M.; Plotkin, M.; Puglisi, M.; Ratti, A.

    1988-01-01

    This paper reports on a high level RF system, which includes a power amplifier and cavity designed for the AGS Booster. It covers a frequency range of 2.4 to 4.2 MHz and will be used to accelerate high intensity proton, and low intensity polarized proton beams to 1.5 GeV and heavy ions to 0.35 GeV per nucleon. A total accelerating voltage of up to 90kV will be provided by two cavities, each having two gaps. The internally cross-coupled, pushpull cavities are driven by an adjacently located power amplifier. In order to accommodate the high beam intensity, up to 0.75 x 10 13 protons per bunch, a low plate resistance power tetrode is used. The tube anode is magnetically coupled to one of the cavity's two paralleled cells. The amplifier is a grounded cathode configuration driven by a remotely located solid state amplifier

  15. ION BEAM POLARIZATION DYNAMICS IN THE 8 GEV BOOSTER OF THE JLEIC PROJECT AT JLAB

    Energy Technology Data Exchange (ETDEWEB)

    Kondratenko, A. M. [GOO Zaryad, Russkaya st., 41, Novosibirsk, 630058, Russia; Kondratenko, M. A. [GOO Zaryad, Russkaya st., 41, Novosibirsk, 630058, Russia; Morozov, Vasiliy [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Derbenev, Yaroslav S. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Lin, Fanglei; Zhang, Yuhong [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Filatov, Yuri [MIPT, Dolgoprudniy, Moscow Region, Russia

    2016-05-01

    In the Jefferson Lab’s Electron-Ion Collider (JLEIC) project, an injector of polarized ions into the collider ring is a superconducting 8 GeV booster. Both figure-8 and racetrack booster versions were considered. Our analysis showed that the figure-8 ring configuration allows one to preserve the polarization of any ion species during beam acceleration using only small longitudinal field with an integral less than 0.5 Tm. In the racetrack booster, to pre-serve the polarization of ions with the exception of deu-terons, it suffices to use a solenoidal Siberian snake with a maximum field integral of 30 Tm. To preserve deuteron polarization, we propose to use arc magnets for the race-track booster structure with a field ramp rate of the order of 1 T/s. We calculate deuteron and proton beam polari-zations in both the figure-8 and racetrack boosters includ-ing alignment errors of their magnetic elements using the Zgoubi code.

  16. History of the ZGS 500 MeV booster.

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, J.; Martin; R.; Kustom, R.

    2006-05-09

    The history of the design and construction of the Argonne 500 MeV booster proton synchrotron from 1969 to 1982 is described. This accelerator has since been in steady use for the past 25 years to power the Argonne Intense Pulsed Neutron Source (IPNS).

  17. 47 CFR 101.151 - Use of signal boosters.

    Science.gov (United States)

    2010-10-01

    ... automatic gain control circuitry which will limit the total effective radiated power (ERP) of the unit to a maximum of 5 watts under all conditions. Class B broadband signal boosters are limited to 5 watts ERP for... remote areas, i.e., areas where there is little or no risk of interference to other users. (e) The...

  18. Irradiation devices used in France to study the ramps

    International Nuclear Information System (INIS)

    Atabek, Rosemarie; Contenson, Ghislain de.

    1978-01-01

    Within the study on the fuel-cladding interaction, the CEA had to build devices for carrying out ramps on the fuel rods of the light water reactor system. Four types of devices have been developed and are operational, namely the BOSS and CADENCES devices in the OSIRIS pile and the BOUFFON and AQUILON devices in the SILOE pile. The power ramps are made of three kinds of fuel rods: experimental fuel rods specially designed for studying the UO 2 -cladding interaction, and pre-irradiated in the core of the experimental piles up to fast doses of 1x10 21 n/cm 2 (IRPHA and TIZ experiments); small rods made in a hot laboratory from long fuel rods from power reactors (FABRICE experiments); whole fuel rods not more than two metres long, previously irradiated in power reactors (PRISCA experiments). In the first part, the main characteristics of the four devices used for the ramps will be briefly recalled. In the second part, the complete diagram of a FABRICE re-irradiation in a BOSS device is given. All the operations are described from the fabrication in a hot laboratory to the results of the examinations after irradiation [fr

  19. Emulsion based cast booster - a priming system

    Energy Technology Data Exchange (ETDEWEB)

    Gupta, R.N.; Mishra, A.K. [National Institute of Rock Mechanics, KGF (India)

    2005-07-01

    This paper explores the potential of emulsion based cast booster to be used as primer to initiate bulk delivered emulsion explosives used in mines. An attempt has been made for comparative study between conventional cast booster and emulsion based cast booster in terms of the initiation process developed and their capability to develop and maintain the stable detonation process in the column explosives. The study has been conducted using a continuous velocity of detonation (VOD) measuring instrument. During this study three blasts have been monitored. In each blast two holes have been selected for study, the first hole being initiated with conventional cast booster while the other one with emulsion based cast booster. The findings of the study advocates that emulsion based cast booster is capable of efficient priming of bulk delivered column explosive with stable detonation process in the column. Further, the booster had advantages over the conventional PETN/TNT based cast booster. 5 refs., 2 figs., 1 tab., 1 photo.

  20. LS1 Report: PS Booster prepares for beam

    CERN Multimedia

    Katarina Anthony

    2014-01-01

    With Linac2 already up and running, the countdown to beam in the LHC has begun! The next in line is the PS Booster, which will close up shop to engineers early next week. The injector will be handed over to the Operations Group who are tasked with getting it ready for active duty.   Taken as we approach the end of LS1 activities, this image shows where protons will soon be injected from Linac2 into the four PS Booster rings. Over the coming two months, the Operations Group will be putting the Booster's new elements through their paces. "Because of the wide range of upgrades and repairs carried out in the Booster, we have a very full schedule of tests planned for the machine," says Bettina Mikulec, PS Booster Engineer in Charge. "We will begin with cold checks; these are a wide range of tests carried out without beam, including system tests with power on/off and with varying settings, as well as verification of the controls system and timings." Amon...

  1. Diamond Light Source Booster fast orbit feedback system

    International Nuclear Information System (INIS)

    Gayadeen, S.; Duncan, S.R.; Christou, C.; Heron, M.T.; Rowland, J.

    2012-01-01

    The Fast Orbit Feedback system that has been installed on the Diamond Light Source Storage ring has been replicated on the Booster synchrotron in order to provide a test bed for the development of the Storage Ring controller design. To realise this the Booster is operated in DC mode. The electron beam is regulated in two planes using the Fast Orbit Feedback system, which takes the beam position from 22 beam position monitors for each plane, and calculates offsets to 44 corrector power supplies at a sample rate of 10 kHz. This paper describes the design and realization of the controller for the Booster Fast Orbit Feedback, presents results from the implementation and considers future development

  2. Proposed data acquisition system for the Fermilab Booster

    International Nuclear Information System (INIS)

    Bharadwaj, V.; Peggs, S.; Wu, G.; Saltmarsh, C.

    1991-01-01

    At present, studies involving the FNAL Booster (or in fact most accelerators) depend on knowing exactly what detector one has to look at and at what time. Because of this, most studies are done 'on-line' and involve looking for repetitive effects using a limited number of detectors. In this paper the authors propose to design a Booster Data Acquisition System (BDAQ) for the FNAL Booster. In essence this system consists of a large number of digitizers with circular memory buffers. After a machine cycle of interest, these buffers are frozen and then read out into a mass storage device. This paper discusses the hardware and software capabilities needed to make such a data acquisition system a powerful tool for doing accelerator physics studies and improving machine performance

  3. A differential-delay control for ramped magnet current

    Energy Technology Data Exchange (ETDEWEB)

    Murray, J. [State Univ. of New York, Stony Brook, NY (United States). Dept. of Electrical Engineering; Olsen, R. [Brookhaven National Lab., Upton, NY (United States)

    1992-11-01

    A differential-delay control system has been designed and implemented for the main dipole magnet power supply of the booster ring at the National Synchrotron Light Source at Brookhaven National Lab. The control algorithm was implemented on a floating-point digital signal processor; in tests, the use of digital signal-processing techniques gave a factor of ten improvement in the tracking response time, together with a modest improvement in tracking accuracy.

  4. A differential-delay control for ramped magnet current

    Energy Technology Data Exchange (ETDEWEB)

    Murray, J. (State Univ. of New York, Stony Brook, NY (United States). Dept. of Electrical Engineering); Olsen, R. (Brookhaven National Lab., Upton, NY (United States))

    1992-01-01

    A differential-delay control system has been designed and implemented for the main dipole magnet power supply of the booster ring at the National Synchrotron Light Source at Brookhaven National Lab. The control algorithm was implemented on a floating-point digital signal processor; in tests, the use of digital signal-processing techniques gave a factor of ten improvement in the tracking response time, together with a modest improvement in tracking accuracy.

  5. The PS Booster hits 40

    CERN Multimedia

    Joannah Caborn Wengler

    2012-01-01

    Many accelerators’ "round" birthdays are being celebrated at CERN these days – the PS turned 50 in 2009, the SPS was 35 in 2011, and this year it's the turn of the PS Booster to mark its 40th anniversary. Originally designed to accelerate 1013 protons to 800 MeV, it has far exceeded its initial design performance over the years.   The PS Booster in the 1970s. Imagine the scene: a group of accelerator physicists staring expectantly at a monitor, when suddenly a shout of joy goes up as a signal flickers across the screen. Does that sound familiar? Well, turn the clock back 40 years (longer hair, wider trouser legs) and you have the situation at the PS Booster on 26 May 1972. On that day, beam was injected into the Booster for the first time. “It was a real buzz,” says Heribert Koziol, then Chairman of the Running-in Committee. “We were very happy – and also a little relieved – when the beam finally...

  6. Linac boosters for electrostatic machines

    International Nuclear Information System (INIS)

    Ben-Zvi, I.; Brookhaven National Lab., Upton, NY

    1990-01-01

    A survey of linacs which are used as boosters to electrostatic accelerators is presented. Machines both operating and under construction, copper and superconducting, are reviewed. The review includes data on the accelerating structures, performance, rf and control, beam optics, budget, vacuum and cryogenics. (orig.)

  7. 78 FR 55648 - Signal Booster Rules

    Science.gov (United States)

    2013-09-11

    ... facilitate review of wireless providers' behavior regarding Consumer Signal Boosters, the R&O requires that... regarding consent for each Consumer Signal Booster that has received FCC certification as listed in a Public... each listed Consumer Signal Booster, wireless providers should publicly indicate whether they (1...

  8. Subcriticality determination in ADS: Valina-Booster experiments

    International Nuclear Information System (INIS)

    Persson, C. M.; Gudowski, W.; Fokau, A.; Bournos, V.; Fokov, Y.; Routkovskaia, C.; Serafimovich, I.; Kiyavitskaya, H.

    2007-01-01

    A major problem in operating a full-scale subcritical accelerator-driven system (ADS) is to ensure sufficient margin to criticality. Therefore, reliable techniques for subcriticality monitoring are required. In order to develop such techniques, a full understanding of existing reactivity determination methods is essential. In this work, reactivity determination methods, such as pulsed neutron source methods and noise methods, are studied experimentally in the subcritical facility YALINA-Booster. YALINA-Booster: The subcritical assembly YALINA-Booster: recently constructed at the Joint Institute for Power and Nuclear Research - Sosny, consists of a subcritical core driven by an external neutron source. The neutron source is a powerful neutron generator consisting of a deuteron accelerator and a target of deuterium or tritium embedded in titanium. Through (d, d) - or (d, t)-reactions neutrons are created with energy around 2.5 MeV and 14.1 MeV respectively. Neutrons are born in the centre of the core and multiply through a lead matrix fuelled with highly enriched uranium (90% and 36%). This zone is referred to as the booster zone and is surrounded by a thermal zone, moderated by polyethylene. In order to reach sufficient high effective multiplication factor, the thermal zone is fuelled by approximately one thousand rods of 10% enriched uranium dioxide in cylindrical geometry. To prevent thermal neutrons from diffusing into the fast booster zone, an interface, consisting of boron carbide and natural uranium rods, is located between the zones. YALINA-Booster has a radial graphite reflector of thickness 24 cm. Experiments: Experiments using the neutron source in pulsed mode will be presented, relying on methods such as the area method and the method of prompt neutron decay rate determination. Moreover, results from noise analysis using for instance the Feynman-α method will be presented

  9. TRACY transient experiment databook. 3) Ramp feed experiment

    International Nuclear Information System (INIS)

    Nakajima, Ken; Yamane, Yuichi; Ogawa, Kazuhiko; Aizawa, Eiju; Yanagisawa, Hiroshi; Miyoshi, Yoshinori

    2002-03-01

    This is a databook of TRACY ''ramp feed'' experiments. TRACY is a reactor to perform supercritical experiments using low-enriched uranyl nitrate aqueous solution. The excess reactivity of TRACY is 3$ at maximum, and it is inserted by feeding the solution to a core tank or by withdrawing a control rod, which is called as the transient rod, from the core. In the ramp feed experiment, the supercritical experiment is initiated by feeding the fuel solution to the core tank in a constant feed rate. The data in the present databook consist of datasheets and graphs. Experimental conditions and typical values of measured parameters are tabulated in the datasheet. In the graph, power and temperature profiles are plotted. Those data are useful for the investigation of criticality accidents with fissile solutions, and for validation of criticality accident analysis codes. (author)

  10. Lean Application to Manufacturing Ramp-Up

    DEFF Research Database (Denmark)

    Christensen, Irene; Rymaszewska, Anna

    2016-01-01

    product development process, that is, the ramp-up process, is a critical, early enabler of lean manufacturing. The manufacturing strategy literature conceptualizes a state of “leanness in operations,” which can consolidate both the concepts of lean and manufacturing ramp-up, providing a dual perspective......This article provides a theoretical overview of the concepts of lean and manufacturing ramp-up in an attempt to conceptualize the strategic areas in which lean philosophy and principles can be applied for continuous improvements. The application of lean principles during the final stage of a new....... Abstracting from the extant literature, the authors considered the competitiveness of manufacturing companies from two principal perspectives: the leanness of the ramp-up process and the new-value creation of quality managers. While much of the literature fails to acknowledge that the roots of lean actually...

  11. Rapid cycling superconducting booster synchrotron

    International Nuclear Information System (INIS)

    Dinev, D.; Agapov, N.; Butenko, A.

    2001-01-01

    The existing set of Nuclotron heavy ion sources, such as duoplasmatron, polarized deuteron, laser and electron beam ion sources permits to have ion beams over a wide range of masses. The main problem for us now is to gain high intensity of accelerator particles. It can be solved by means of multiturn injection of the low current beams into the booster, acceleration up to the intermediate energies, stripping and transferring into the main ring. A design study of this accelerator - the 250 MeV/Amu Nuclotron booster synchrotron at 1 Hz repetition rate and circumference of 84 m, has been completed. The lattice dipole and quadrupole magnets have an iron yoke coils, made of hollow superconductor, are cooled by two-phase Helium flow, as well as the Nuclotron magnets. (authors)

  12. A.C. losses in the SSC high energy booster dipole magnets

    International Nuclear Information System (INIS)

    Jayakumar, R.; Kovachev, V.; Orrell, D.; Snitchler, G.

    1992-01-01

    This paper reports on the baseline design for the SSC High Energy Booster (HEB) which has dipole bending magnets with a 50 mm aperture. An analysis of the cryogenic heat load due to A.C. losses generated in the HEB ramp cycle are reported for this magnet. Included in this analysis are losses from superconductor hysteresis, yoke hysteresis, strand eddy currents, and cable eddy currents. The A.C. loss impact of 2.5 μm vs. 6 μm filament conductor is presented. A 60 mm aperture design is also investigated

  13. Improving Wind Ramp Forecasts by the HRRR System via Statistical Postprocessing

    Science.gov (United States)

    Worsnop, Rochelle; Scheuerer, Michael; Hamill, Thomas M.

    2017-04-01

    Wind power forecasting is gaining enormous international significance as more and more countries and regions enact policies to increase the use of renewable energy. Wind ramps pose a particular challenge in decision-making processes in the wind energy industry since a sudden decrease or increase in wind energy production must be balanced by conventional power generators and could be costly for wind farm operators. In this study, we assess the performance of the High-Resolution Rapid Refresh (HRRR) numerical weather prediction model in predicting wind ramps with up to 12 hours of lead time at two wind tower locations in the United States. Novel statistical postprocessing methodology is used to generate scenarios of short-term wind power production; this probabilistic enhancement of the deterministic HRRR forecasts significantly improves the skill in predicting wind ramp events, and could be implemented by wind farm operators to support decision-making.

  14. Perception of duration of ramped and damped sounds with exponential and raised cosine ramps

    Science.gov (United States)

    Grassi, Massimo; Darwin, Christopher J.

    2002-05-01

    In the first experiment listeners were asked to adjust the duration of a steady-level sound in order to match the duration of 250-, 500-, 750-, or 1000-ms targets. Targets could be either steady in level, increasing in level with either a raised-cosine or an exponential ramp (ramped sounds), or the ramped sounds reversed in time (damped sounds). The results extended to longer durations than those reported by Schlauch et al. [J. Acoust. Soc. Am. 109, 2880-2887 (2001)]: damped sounds were matched as much shorter (~35% for exponential ramps, ~30% for raised-cosine ramps) and ramped sounds as slightly shorter (~10%) than steady-level sounds. In the second experiment, the subjective duration of all targets used in the first experiment was measured as the difference between reaction times to their onsets and their offsets. Although delays in reaction times to onsets of ramped targets could explain their slight underestimation, anticipations to offsets of damped targets were too small to explain their underestimation. The results of the research contradict the predictions of the AIM model [R. D. Patterson and T. Irino, J. Acoust. Soc. Am. 104, 2967-2979 (1998)], where ramped and damped sounds longer than 200 ms should be perceived as possessing similar subjective durations.

  15. Vertical septum magnets for distributing the beam to the 4 PS Booster rings

    CERN Multimedia

    Ordan, Julien Marius

    2017-01-01

    To facilitate H- injection from Linac4 to the PS Booster via the transfer line the BI.SMV10 (Booster Injection Septum Magnet Vertical) provides the vertical deflection of the 160 MeV H- beam to rings 1, 2 and 4 of the Booster. Currently this system is capable of deflecting 50 MeV protons and comprises an assembly of ferrite type magnets in an “omega” section vacuum tank (see fig. 1). The current system shall be replaced with a UHV compatible vacuum chamber incorporating 3 sets of double septum magnets, pulsed from 3 individual power supplies via transformers with 12:1 ratio.

  16. A rookie's guide to Booster operations. Booster technical note no. 231

    Energy Technology Data Exchange (ETDEWEB)

    Zeno, K. [Brookhaven National Lab. (BNL), Upton, NY (United States). Alternating Gradient Synchrotron Dept.

    1998-09-29

    The purpose of the Booster is to act as an injector for the AGS. It accelerates both protons and other ions. Proton acceleration is distinguished from the acceleration of other ions for several reasons. First, the experimental physics associated with protons, called High Energy Physics is different than that associated with other Ions, called Heavy Ion Physics. From the machine perspective, the process of injection of so called Heavy Ions (ions which are not protons), is distinctly different, from that of protons. A different preinjector, or injector for the Booster, is used for each case. For Protons, a 200 MeV Linear accelerator (The Linac) serves as a preinjector; for Heavy Ions, the Tandem Van De Graaf (The Tandem) is the preinjector. An attribute of the circulating beam which determines to a large degree what problems and what type of machine setup is involved is the beam intensity. The author's focus in this guide is on trying to convey the knowledge and experience involved in the operation of the Booster. Many of the problems encountered can be traced back to equipment failures, often power supplies. Although diagnostics are used, there can also be issues with the controls system itself. Problems with the controls system and prevent fixing or even finding a problem with a machine. The issue of improving a machines' performance can often involve trial and error and observations. The hard part is finding the relationships between things in the day to day operation of the machine. Abstractions about physics, information about controls and instrumentation, and purely empirical observations of how the machine behaves are all part of it.

  17. Micro-Ramps for Hypersonic Flow Control

    Directory of Open Access Journals (Sweden)

    Konstantinos Kontis

    2012-04-01

    Full Text Available Shock/boundary layer interaction (SBLI is an undesirable phenomenon, occurring in high-speed propulsion systems. The conventional method to manipulate and control SBLI is using a bleed system that involves the removal of a certain amount of mass of the inlet flow to control boundary layer separation. However, the system requires a larger nacelle to compensate the mass loss, larger nacelles contribute to additional weight and drag and reduce the overall performance. This study investigates a novel type of flow control device called micro-ramps, a part of the micro vortex generators (VGs family that intends to replace the bleed technique. Micro-ramps produce pairs of counter-rotating streamwise vortices, which help to suppress SBLI and reduce the chances of flow separation. Experiments were done at Mach 5 with two micro-ramp models of different sizes. Schlieren photography, surface flow visualization and infrared thermography were used in this investigation. The results revealed the detailed flow characteristics of the micro-ramp, such as the primary and secondary vortices. This helps us to understand the overall flow physics of micro-ramps in hypersonic flow and their application for SBLI control.

  18. Booster Double Harmonic Setup Notes

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, C. J. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2015-02-17

    The motivation behind implementing a booster double harmonic include the reduced transverse space charge force from a reduced peak beam current and reduced momentum spread of the beam, both of which can be achieved from flattening the RF bucket. RF capture and acceleration of polarized protons (PP) is first set up in the single harmonic mode with RF harmonic h=1. Once capture and acceleration have been set up in the single harmonic mode, the second harmonic system is brought on and programmed to operate in concert with the single harmonic system.

  19. Detailed magnetic model simulations of the H- injection chicane magnets for the CERN PS Booster Upgrade, including eddy currents and influence on beam dynamics

    CERN Document Server

    Benedetto, E; Borburgh, J; Carli, C; Martini, M; Forte, V

    2014-01-01

    The CERN PS Booster will be upgraded with an H- injection system. The chicanemagnets for the injection bump ramp-down in 5 ms and generate eddy currents in the inconel vacuum chamber which perturb the homogeneity of the magnetic field. The multipolar field components are extracted from 3D OPERA simulations and are included in the lattice model. The -beating correction is computed all along the ramp and complete tracking simulations including space-charge are performed to evaluate the impact of these perturbations and correction on beam dynamics.

  20. Quantum strongly secure ramp secret sharing

    DEFF Research Database (Denmark)

    Zhang, Paul; Matsumoto, Rytaro Yamashita

    2015-01-01

    Quantum secret sharing is a scheme for encoding a quantum state (the secret) into multiple shares and distributing them among several participants. If a sufficient number of shares are put together, then the secret can be fully reconstructed. If an insufficient number of shares are put together...... however, no information about the secret can be revealed. In quantum ramp secret sharing, partial information about the secret is allowed to leak to a set of participants, called an unqualified set, that cannot fully reconstruct the secret. By allowing this, the size of a share can be drastically reduced....... This paper introduces a quantum analog of classical strong security in ramp secret sharing schemes. While the ramp secret sharing scheme still leaks partial information about the secret to unqualified sets of participants, the strong security condition ensures that qudits with critical information can...

  1. The AGS Booster high frequency rf system

    International Nuclear Information System (INIS)

    Sanders, R.T.; Cameron, P.; Eng, W.; Goldman, M.A.; Jablonski, E.; Kasha, D.; Keane, J.; McNerney, A.; Meth, M.; Plotkin, M.; Puglisi, M.; Ratti, A.; Spitz, R.

    1991-01-01

    A high level rf system, including a power amplifier and cavity, has been designed and built for the AGS Booster. It covers a frequency range of 2.4 to 4.2 MHz and will be used to accelerate high intensity protons. Low intensity polarized protons and heavy ions, to the 1.5 GeV level. A total accelerating voltage of up to 90 kV will be provided by two cavities, each having two gaps. The internally cross coupled, pushpull cavities are driven by an adjacently located power amplifier. In order to accommodate beam intensities up to 0.75 x 10 13 protons per bunch, a low plate resistance power tetrode is used. The tube anode is magnetically coupled to one of the cavity's two parallel cells. The amplifier is a grounded cathode configuration driven by a remotely located solid-state amplifier. It has been tested in the laboratory at full gap voltage with satisfactory results. 5 refs., 2 figs., 1 tab

  2. The AGS Booster high frequency RF system

    International Nuclear Information System (INIS)

    Sanders, R.T.; Cameron, P.; Eng, W.; Goldman, M.A.; Jablonski, E.; Kasha, D.; Keane, J.; McNerney, A.; Meth, M.; Plotkin, M.; Puglisi, M.; Ratti, A.; Spitz, R.

    1991-01-01

    A high level RF system, including a power amplifier and cavity, has been designed and built for the AGS Booster. It covers a frequency range of 2.4 to 4.2 MHz and will be used to accelerate high intensity protons, low intensity polarized protons and heavy ions, to the 1.5 GeV level. A total accelerating voltage of up to 90 kV will be provided by two cavities, each having two gaps. The internally cross-coupled, pushpull cavities are driven by an adjacently located power amplifier. In order to accommodate beam intensities up to 0.75 x 10 13 protons per bunch, a low plate resistance power tetrode is used. The tube anode is magnetically coupled to one of the cavity's two parallel cells. The amplifier is a grounded cathode configuration driven by a remotely located solid-state amplifier. It has been tested in the laboratory at full gap voltage with satisfactory results

  3. Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Bhat, C. M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2015-10-28

    Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector accelerators, namely, the current 400 MeV LINAC and the Booster, are in progress under the Proton Improvement Plan (PIP). Proton Improvement Plan-II (PIP-II) proposes to replace the existing 400 MeV LINAC by a new 800 MeV LINAC, as an injector to the Booster which will increase Booster output power by nearly a factor of two from the PIP design value by the end of its completion. In any case, the Fermilab Booster is going to play a very significant role for nearly next two decades. In this context, I have developed and investigated a new beam injection scheme called "early injection scheme" (EIS) for the Booster with the goal to significantly increase the beam intensity output from the Booster thereby increasing the beam power to the HEP experiments even before PIP-II era. The scheme, if implemented, will also help improve the slip-stacking efficiency in the MI/RR. Here I present results from recent simulations, beam studies, current status and future plans for the new scheme.

  4. NASA's Space Launch System Advanced Booster Development

    Science.gov (United States)

    Robinson, Kimberly F.; Crumbly, Christopher M.; May, Todd A.

    2014-01-01

    The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for human space flight and scientific missions beyond Earth orbit. NASA is executing this development within flat budgetary guidelines by using existing engines assets and heritage technology to ready an initial 70 metric ton (t) lift capability for launch in 2017, and then employing a block upgrade approach to evolve a 130-t capability after 2021. A key component of the SLS acquisition plan is a three-phased approach for the first-stage boosters. The first phase is to expedite the 70-t configuration by completing development of the Space Shuttle heritage 5-segment solid rocket boosters (SRBs) for the initial flights of SLS. Since no existing boosters can meet the performance requirements for the 130-t class SLS, the next phases of the strategy focus on the eventual development of advanced boosters with an expected thrust class potentially double the current 5-segment solid rocket booster capability of 3.88 million pounds of thrust each. The second phase in the booster acquisition plan is the Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) effort, for which contracts were awarded beginning in 2012 after a full and open competition, with a stated intent to reduce risks leading to an affordable advanced booster. NASA has awarded ABEDRR contracts to four industry teams, which are looking into new options for liquid-fuel booster engines, solid-fuel-motor propellants, and composite booster structures. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an advanced booster. This paper will discuss the status of this acquisition strategy and its results toward readying both the 70 t and 130 t configurations of SLS. The third and final phase will be a full and open

  5. Field test of coordinated ramp metering (CRM).

    Science.gov (United States)

    2017-03-15

    This project has focused on field implementation and testing of a Coordinated Ramp Metering (CRM) algorithm at California State Route 99 : Northbound corridor in Sacramento between Calvine Road and the SR50 interchange after 12th Ave. It is a 9 mile ...

  6. Hangingwall accomodation styles in flat ramp trust

    NARCIS (Netherlands)

    Mulugeta, G.; Sokoutis, D.

    2003-01-01

    In this paper we study the dynamic and rheologic control of hanging wall accommodation in ramp-flat thrust models. In particular we vary the dimensionless ratio of shear strength to gravity stress to model hanging wall accommodation styles in different materials. In all models we require that the

  7. Tetanus Booster -A missed opportunity

    Directory of Open Access Journals (Sweden)

    Rajesh Gupta

    2014-06-01

    Full Text Available Tetanus a known childhood killer is an entirely preventable disease with tetanus toxoid (TT. Most of the research today is on neonatal tetanus owing to its high case fatality rate. Though the reported mortality with tetanus is lower in older age groups, the management of tetanus is still a challenge in resource constraint settings of developing countries like India. On this background the present study was designed to know the status of tetanus immunization among school going age group children. This was an OPD based survey targeting school going children (age of 5 to 18 years attending Pediatric out-patient department (OPD of a tertiary care teaching hospital. It was observed that out of 636, 299 (47% children were vaccinated for diphtheria, pertusis and tetanus (DPT booster at 5 years of age. Out of 374 children eligible for TT (10 to 16 years only 37 (9.8 % were immunized with TT at age 10 years. Out of 44 children at age of 16 years only 6 (13.6% were immunized. Though there are strategies to immunize school going children under routine immunization programme, official records documented that the immunization coverage for TT was 68% in school going age group. Majority of (80% the cases of tetanus were in non-neonatal age group (mainly school going group in Madhya Pradesh, India. Based on these observations it can be concluded that the tetanus immunization coverage among children of school going age was poor in the given setting.  Tetanus is an acute, spastic paralytic illness historically called lockjaw that is caused by the neurotoxin produced by Clostridium tetani. Tetanus occurs worldwide and is endemic in approximately 90 developing countries. Tetanus is an entirely preventable disease with active immunization with tetanus toxoid. A serum antibody titer of ≥0.01 U/mL is considered protective. [1] In India, according to National immunization schedule, active immunization against tetanus is done with administration of tetanus toxoid as

  8. Entry ramps in the Nagel-Schreckenberg model

    DEFF Research Database (Denmark)

    Pedersen, Morten Monrad; Ruhoff, Peder Thusgaard

    2002-01-01

    This paper describes a way of including entry ramps in the Nagel-Schreckenberg traffic model. The idea is to place what are called shadow cars on a highway next to cars on entry ramps, which enables the drivers to take ramp cars into account. The model is shown to capture important real...

  9. Main cycle controls for the AGS Booster synchrotron

    International Nuclear Information System (INIS)

    Culwick, B.B.; Yen, S.

    1991-01-01

    The AGS Booster is a separated function synchrotron with the main excitation coils of the dipoles and quadrupoles connected electrically in series. This circuit is driven by a complex modular power supply with current and voltage reference functions to obtain the desired magnetic fields as a function of time. The dipole cycle is defined by algebraic functions specifying the desired field profile as a function of time. These functions are processed through successive phases to convert to the signals needed to provide the power supply with one current and six voltage references. The user interface and algorithms to derive the control variables are described

  10. Main cycle controls for the AGS Booster synchrotron

    International Nuclear Information System (INIS)

    Culwick, B.B.; Yen, S.

    1991-01-01

    The AGS Booster is a separated function synchrotron with the main excitation coils of the dipoles and quadrupoles connected electrically in series. This circuit is driven by a complex modular power supply with current and voltage reference functions to obtain the desired magnetic fields as a function of time. The dipole cycle is defined by algebraic functions specifying the desired field profile as a function of time. These functions are processed through successive phases to convert to the signals needed to provide the power supply with one current and six voltage references. The user interface and algorithms to derive the control variables are described. 4 refs., 3 figs

  11. Research on recognition of ramp angle based on transducer

    Directory of Open Access Journals (Sweden)

    Wenhao GU

    2015-12-01

    Full Text Available Focusing on the recognition of ramp angle, the relationship between the signal of vehicle transducer and real ramp angle is studied. The force change of vehicle on the ramp, and the relationship between the body tilt angle and front and rear suspension scale is discussed. According to the suspension and tire deformation, error angle of the ramp angle is deduced. A mathematical model is established with Matlab/Simulink and used for simulation to generate error curve of ramp angle. The results show that the error angle increases with the increasing of the ramp angle, and the limit value can reach 6.5%, while the identification method can effectively eliminate this error, and enhance the accuracy of ramp angle recognition.

  12. Beam instrumentation in the AGS Booster

    International Nuclear Information System (INIS)

    Witkover, R.L.

    1991-01-01

    The AGS Booster was designed to accelerate low intensity (2 x 10 10 ) polarized protons, high intensity (1.5x10 13 ) protons and heavy ions through Au +33 . Coping with this wide range of beams, the 3 x 10 -11 Torr vacuum and the radiation environment presented challenges for the beam monitors. Some of the more interesting instrumentation design and performance during the recent Booster proton commissioning will be described

  13. New beam instrumentation in the AGS Booster

    International Nuclear Information System (INIS)

    Witkover, R.L.

    1991-01-01

    The AGS Booster was designed to accelerate beams from 2x10 10 polarized protons to 1.5x10 13 protons and heavy ions through Au +33 . The range of beam parameters and the high vacuum, and radiation environment presented challenges for the beam instrumentation. Some interesting beam monitors in the Booster and transport lines, will be described. Where available, results will be presented. 21 refs., 7 figs

  14. Gas Test Loop Booster Fuel Hydraulic Testing

    Energy Technology Data Exchange (ETDEWEB)

    Gas Test Loop Hydraulic Testing Staff

    2006-09-01

    The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3.

  15. Off ramp : a secondary school TDM program

    Energy Technology Data Exchange (ETDEWEB)

    Haq, F. [Better Environmentally Sound Transportation (BEST), Vancouver, BC (Canada)

    2002-07-01

    The cities of Vancouver and Victoria in British Columbia have implemented a high school vehicle trip reduction program entitled Off-Ramp. The program, created by BEST, is about youth empowerment to help youths lead their peers to walk, cycle, skateboard, in-line skate, or carpool to school for a sustainable environment. Students raise awareness through media and drama to counter pop images of driving as being cool. Sponsorship is very important to the success of the program.

  16. Ramping Performance Analysis of the Kahuku Wind-Energy Battery Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Corbus, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-11-01

    High penetrations of wind power on the electrical grid can introduce technical challenges caused by resource variability. Such variability can have undesirable effects on the frequency, voltage, and transient stability of the grid. Energy storage devices can be an effective tool in reducing variability impacts on the power grid in the form of power smoothing and ramp control. Integrating anenergy storage system with a wind power plant can help smooth the variable power produced from wind. This paper explores the fast-response, megawatt-scale, wind-energy battery storage systems that were recently deployed throughout the Hawaiian islands to support wind and solar projects.

  17. Orbital Payload Reductions Resulting from Booster and Trajectory Modifications for Recovery of a Large Rocket Booster

    Science.gov (United States)

    Levin, Alan D.; Hopkins, Edward J.

    1961-01-01

    An analysis was made to determine the reduction in payload for a 300 nautical mile orbit resulting from the addition of inert weight, representing recovery gear, to the first-stage booster of a three-stage rocket vehicle. The values of added inert weight investigated ranged from 0 to 18 percent of gross weight at lift off. The study also included the effects on the payload in orbit and the distance from the launch site at burnout and at impact caused by variation in the vertical rise time before the programmed tilt. The vertical rise times investigated ranged from 16-7 to 100 percent of booster burning time. For a vertical rise of 16.7 percent of booster burning time it was found that a 50-percent increase in the weight of the empty booster resulted in only a 10-percent reduction of the payload in orbit. For no added booster weight, increasing vertical rise time from 16-7 to 100 percent of booster burning time (so that the spent booster would impact in the launch area) reduced the payload by 37 percent. Increasing the vertical rise time from 16-7 to 50 percent of booster burning time resulted in about a 15-percent reduction in the impact distance, and for vertical rise times greater than 50-percent the impact distance decreased rapidly.

  18. Digital intelligent booster for DCC miniature train networks

    Science.gov (United States)

    Ursu, M. P.; Condruz, D. A.

    2017-08-01

    Modern miniature trains are now driven by means of the DCC (Digital Command and Control) system, which allows the human operator or a personal computer to launch commands to each individual train or even to control different features of the same train. The digital command station encodes these commands and sends them to the trains by means of electrical pulses via the rails of the railway network. Due to the development of the miniature railway network, it may happen that the power requirement of the increasing number of digital locomotives, carriages and accessories exceeds the nominal output power of the digital command station. This digital intelligent booster relieves the digital command station from powering the entire railway network all by itself, and it automatically handles the multiple powered sections of the network. This electronic device is also able to detect and process short-circuits and overload conditions, without the intervention of the digital command station.

  19. Progress on the IPNS Enriched Uranium Booster Target

    International Nuclear Information System (INIS)

    Knox, A.E.; Carpenter, J.M.; Bailey, J.L.

    1986-09-01

    We describe the Enriched Uranium Booster Target designed for use in Argonne's Intense Pulsed Neutron Source. This report contains a general description of the system, and descriptions of the thermal-hydraulic and loss-of-coolant accident analyses, of the neutronic, criticality and power density calculations, of the assessment of radiation and thermal cycling growth, and of the disk fabrication methods. We also describe the calculations of radionuclide buildup and the related hazards analysis and our calculations of the temperature and stress profiles in the disks, and briefly allude to considerations of security and safeguards

  20. Integrable RCS as a Proposed Replacement for Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Eldred, Jeffrey [Fermilab; Valishev, Alexander [Fermilab

    2017-03-07

    Integrable optics is an innovation in particle accelerator design that potentially enables a greater betatron tune spread and damps collective instabilities. An integrable rapid-cycling synchrotron (RCS) would be an effective replacement for the Fermilab Booster, as part of a plan to reach multi-MW beam power at 120 GeV for the Fermilab high-energy neutrino program. We provide an example integrable lattice with features of a modern RCS - dispersion-free drifts, low momentum compaction factor, superperiodicity, chromaticity correction, bounded beta functions, and separate-function magnets.

  1. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  2. Modelling of fission gas release in rods from the International DEMO-RAMP-II Project at Studsvik

    International Nuclear Information System (INIS)

    Malen, K.

    1983-01-01

    The DEMO-RAMP-II rods had a burn-up of 25-30 MWd/kg U. They were ramped to powers in the range 40-50 kW/m with hold times between 10 s and 4.5 minutes. In spite of the short hold times the fission gas release at the higher powers was more than 1%. With these short hold times it is natural to assume that mixing of released gas with plenum gas is limited. Modelling has been performed using GAPCONSV (a modified GAPCON-THERMAL-2) both with and without mixing of released gas with plenum gas. In particular for the high power-short duration ramps only the ''no mixing'' modelling yields release fractions comparable to the experimental values. (author)

  3. Solid Rocket Motor/Booster-Illustration

    Science.gov (United States)

    1976-01-01

    This image illustrates the solid rocket motor (SRM)/solid rocket booster (SRB) configuration. The Shuttle's two SRB's are the largest solids ever built and the first designed for refurbishment and reuse. Standing nearly 150-feet high, the twin boosters provide the majority of thrust for the first two minutes of flight, about 5.8 million pounds, augmenting the Shuttle's main propulsion system during liftoff. The major design drivers for the SRM's were high thrust and reuse. The desired thrust was achieved by using state-of-the-art solid propellant and by using a long cylindrical motor with a specific core design that allows the propellant to burn in a carefully controlled marner. At burnout, the boosters separate from the external tank and drop by parachute to the ocean for recovery and subsequent refurbishment. The boosters are designed to survive water impact at almost 60 miles per hour, maintain flotation with minimal damage, and preclude corrosion of the hardware exposed to the harsh seawater environment. Under the project management of the Marshall Space Flight Center, the SRB's are assembled and refurbished by the United Space Boosters. The SRM's are provided by the Morton Thiokol Corporation.

  4. Flying Off a Frictionless Curved Ramp

    Science.gov (United States)

    2015-06-01

    Conservation of mechanical energy. Resumen Una ecuación general se deriva para un punto a lo largo de una trayectoria curvada descendente, de una partícula...objeto empieza desde el reposo hasta un punto en que la pendiente de la curva es cero. La velocidad de lanzamiento y el ángulo se calculan para los...gravitational field having magnitude g . The particle loses contact with the track when it has speed 0 and when the slope of the ramp makes angle 0

  5. Ramp - Metering Algorithms Evaluated within Simplified Conditions

    Science.gov (United States)

    Janota, Aleš; Holečko, Peter; Gregor, Michal; Hruboš, Marián

    2017-12-01

    Freeway networks reach their limits, since it is usually impossible to increase traffic volumes by indefinitely extending transport infrastructure through adding new traffic lanes. One of the possible solutions is to use advanced intelligent transport systems, particularly ramp metering systems. The paper shows how two particular algorithms of local and traffic-responsive control (Zone, ALINEA) can be adapted to simplified conditions corresponding to Slovak freeways. Both control strategies are modelled and simulated using PTV Vissim software, including the module VisVAP. Presented results demonstrate the properties of both control strategies, which are compared mutually as well as with the initial situation in which no control strategy is applied

  6. Off-bucket Proton Losses during Ramping

    CERN Document Server

    Catalan-Lasheras, N

    1998-01-01

    In this paper, we report a study undertaken to determine whether longitudinal and transverse amplitudes become coupled before the loss of the off-bucket protons during the ramp. We compute the synchro tron as well as the betatron tune changes with momentum and determine if synchro-betatron resonances blow-up the transverse particle amplitude. A strong coupling might allow a betatron cleaning of the se particles before they are outside the momentum acceptance of the machine. We show that this is not the case, justifying the need of momentum cleaning.

  7. Ramp metering with an objective to reduce fuel consumption

    OpenAIRE

    Vreeswijk, Jacob Dirk; Woldeab, Zeremariam; de Koning, Anne; Bie, Jing

    2011-01-01

    Ramp meters successfully decrease congestion but leave a burden on the traffic situation at on-ramps. Chaotic queuing leads to many stop-and-go movements and causes inefficiency where fuel consumption is concerned. As part of the eCoMove project, complementary strategies are being designed and evaluated to reduce fuel consumption at metered on-ramps, using vehicle-to-infrastructure communication. This paper presents the design of two strategies, as well as their effect as derived from simulat...

  8. Evaluatie ramp in Bhopal in relatie tot arbeidsveiligheid

    OpenAIRE

    Pietersen, C.M.; Bruggeman, J.M.

    1987-01-01

    De ramp in Bhopal wordt geanalyseerd op het punt van procesveiligheid en arbeidsveiligheid. Geconcludeerd wordt dat de ramp te wijten is aan een samenloop van omstandigheden, een oorzakenstructuur. Met behulp van de TNO ongevallen - databank FACTS is geconcludeerd dat deze structuur nauwelijks afwijkt van andere ernstige ongevallen. De ramp in Bhopal was dan ook uitsluitend een uniek ongeval door de zeer fatale gevolgen. De belangrijkste lessen die uit Bhopal geleerd kunnen worden zijn ; het ...

  9. LHC Report: Intensity ramp-up

    CERN Multimedia

    Mike Lamont for the LHC Team

    2012-01-01

    The first stable beams at 4 TeV were declared on Thursday, 5 April with 3 bunches per beam. This marked the start of the intensity ramp-up, which aims to get back up to 1380 bunches per beam as quickly as is safely possible.   The next couple of days saw fills with 47, 84 and 264 bunches per beam and on Sunday, 8 April the move was made to 624 bunches. With the squeeze to 60 cm in place, 624 bunches with reasonably high bunch intensities of around 1.3 to 1.4 x1011 protons per bunch have already yielded respectable peak luminosities of up to 2.5 x1033 cm-2s-1. Following a lot of hard work during the Christmas technical stop, machine availability is very good at the moment. The ramp-up in the number of bunches is accompanied by a series of checks aimed to make sure the machine protection systems and operational procedures are in a good enough shape to safely deal with the beam intensity. 624 bunches at 4 TeV already represents an energy over 50 MJ and serious damage potential. The next few days sh...

  10. Accelerating RF cavity of the Booster

    CERN Multimedia

    CERN PhotoLab

    1981-01-01

    Each of the 4 PS Booster rings has a single accelerating cavity. It consists of 2 quarter-wave ferrite-loaded resonators. There are 2 figure-of-eight loops on the ferrite loads for tuning the frequency throughout the acceleration cycle, from 3 to 8 MHz (from 50 MeV at injection to the original Booster energy of 800 MeV, 2 GeV today). The cavities have a flat design, to fit the ring-to-ring distance of 36 cm. The tube for forced-air cooling is visible in the left front. See also 8301084.

  11. The AGS Booster Beam Position Monitor system

    International Nuclear Information System (INIS)

    Ciardullo, D.J.; Abola, A.; Beadle, E.R.; Smith, G.A.; Thomas, R.; Van Zwienen, W.; Warkentien, R.; Witkover, R.L.

    1991-01-01

    To accelerate both protons and heavy ions, the AGS Booster requires a broadband (multi-octave) beam position monitoring system with a dynamic range spanning several orders of magnitude (2 x 10 10 to 1.5 x 10 13 particles per pulse). System requirements include the ability to acquire single turn trajectory and average orbit information with ± 0.1 mm resolution. The design goal of ± 0.5 mm corrected accuracy requires that the detectors have repeatable linear performance after periodic bakeout at 300 degree C. The system design and capabilities of the Booster Beam Position Monitor will be described, and initial results presented. 7 refs., 5 figs

  12. Improvement of Digital Filter for the FNAL Booster Transverse Dampers

    Energy Technology Data Exchange (ETDEWEB)

    Zolkin, Timofey [Fermilab; Eddy, N. [Fermilab; Lebedev, V. [Fermilab

    2013-09-26

    Fermilab Booster has two transverse dampers which independently suppress beam instabilities in the horizontal and vertical planes. A suppression of the common mode signal is achieved by digital notch filter which is based on subtracting beam positions for two consecutive turns. Such system operates well if the orbit position changes sufficiently slow. Unfortunately it is not the case for FNAL Booster where the entire accelerating cycle consists of about 20000 turns, and successful transition crossing requires the orbit drifts up to about 10 μm/turn, resulting in excessive power, power amplifier saturation and loss of stability. To suppress this effect we suggest an improvement of the digital filter which can take into account fast orbit changes by using bunch positions of a few previous turns. To take into account the orbit change up toN-th order polynomial in time the system requires (N + 3) turns of “prehistory”. In the case of sufficiently small gain the damping rate and the optimal digital filter coefficients are obtained analytically. Numerical simulations verify analytical theory for the small gain and predict a system performance with gain increase.

  13. Progress on the Design of a Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Madrak, R. L. [Fermilab; Dey, J. E. [Fermilab; Duel, K. L. [Fermilab; Kuharik, J. C. [Fermilab; Pellico, W. A. [Fermilab; Reid, J. S. [Fermilab; Romanov, G. [Fermilab; Slabough, M. [Fermilab; Sun, D. [Fermilab; Tan, C. Y. [Fermilab; Terechkine, I. [Fermilab

    2016-10-01

    perpendicularly biased 2nd harmonic cavity is being designed and built for the Fermilab Booster. Its purpose is to flatten the bucket at injection and thus change the longitudinal beam distribution to decrease space charge effects. It can also help at extraction. The cavity frequency range is 76 – 106 MHz. The power amplifier will be built using the Y567B tetrode, which is also used for the fundamental mode cavities in the Fermilab Booster. We discuss recent progress on the cavity, the biasing solenoid design and plans for testing the tuner's garnet material

  14. A TEG Efficiency Booster with Buck-Boost Conversion

    Science.gov (United States)

    Wu, Hongfei; Sun, Kai; Zhang, Junjun; Xing, Yan

    2013-07-01

    A thermoelectric generator (TEG) efficiency booster with buck-boost conversion and power management is proposed as a TEG battery power conditioner suitable for a wide TEG output voltage range. An inverse-coupled inductor is employed in the buck-boost converter, which is used to achieve smooth current with low ripple on both the TEG and battery sides. Furthermore, benefiting from the magnetic flux counteraction of the two windings on the coupled inductor, the core size and power losses of the filter inductor are reduced, which can achieve both high efficiency and high power density. A power management strategy is proposed for this power conditioning system, which involves maximum power point tracking (MPPT), battery voltage control, and battery current control. A control method is employed to ensure smooth switching among different working modes. A modified MPPT control algorithm with improved dynamic and steady-state characteristics is presented and applied to the TEG battery power conditioning system to maximize energy harvesting. A 500-W prototype has been built, and experimental tests carried out on it. The power efficiency of the prototype at full load is higher than 96%, and peak efficiency of 99% is attained.

  15. Thermoeconomic model of a commercial transcritical booster refrigeration system

    DEFF Research Database (Denmark)

    Ommen, Torben Schmidt; Elmegaard, Brian

    2011-01-01

    For cooling applications in supermarkets, booster refrigeration systems operating in both transcritical and subcritical conditions are increasingly used. A thermodynamic model of a transcritical booster refrigeration plant is tailored to match the new generation of commercial refrigeration plants...

  16. Impacts of ramping inflexibility of conventional generators on strategic operation of energy storage facilities

    DEFF Research Database (Denmark)

    Nasrolahpour, Ehsan; Kazempour, Jalal; Zareipour, Hamidreza

    2016-01-01

    This paper proposes an approach to assist a pricemaker merchant energy storage facility in making its optimal operation decisions. The facility operates in a pool-based electricity market, where the ramping capability of other resources is limited. Also, wind power resources exist in the system....... The merchant facility seeks to maximize its profit through strategic inter-temporal arbitrage decisions, when taking advantage of those ramp limitations. The market operator, on the other hand, aims at maximizing the social welfare under wind power generation uncertainty. Thus, a stochastic bi......-level optimization model is proposed, taking into account the interactions between the storage facility and the market operator, and the existing market opportunities for the storage facility. The proposed bilevel model is then transformed into a Mathematical Program with Equilibrium Constraints (MPEC) that can...

  17. Ramp metering with an objective to reduce fuel consumption

    NARCIS (Netherlands)

    Vreeswijk, Jacob Dirk; Woldeab, Zeremariam; de Koning, Anne; Bie, Jing

    2011-01-01

    Ramp meters successfully decrease congestion but leave a burden on the traffic situation at on-ramps. Chaotic queuing leads to many stop-and-go movements and causes inefficiency where fuel consumption is concerned. As part of the eCoMove project, complementary strategies are being designed and

  18. Evaluatie ramp in Bhopal in relatie tot arbeidsveiligheid

    NARCIS (Netherlands)

    Pietersen, C.M.; Bruggeman, J.M.

    1987-01-01

    De ramp in Bhopal wordt geanalyseerd op het punt van procesveiligheid en arbeidsveiligheid. Geconcludeerd wordt dat de ramp te wijten is aan een samenloop van omstandigheden, een oorzakenstructuur. Met behulp van de TNO ongevallen - databank FACTS is geconcludeerd dat deze structuur nauwelijks

  19. 78 FR 21555 - Signal Booster Rules

    Science.gov (United States)

    2013-04-11

    ... unwanted emissions) for the applicable spectrum band; (2) automatically self-monitor certain operations and... licensee's allocated spectrum. (F) Out of Band Emission Limits. Booster out of band emissions (OOBE) shall.... Establishments in this industry have spectrum licenses and provide services using that spectrum, such as cellular...

  20. 30 CFR 57.8518 - Main and booster fans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Main and booster fans. 57.8518 Section 57.8518... and Underground § 57.8518 Main and booster fans. (a) All mine main and booster fans installed and used...-cycle shutdowns or planned or scheduled fan maintenance or fan adjustments where air quality is...

  1. An integrated aerodynamic-ramp-injector/plasma-torch-igniter for supersonic combustion applications with hydrocarbon fuels

    Science.gov (United States)

    Jacobsen, Lance Steven

    The first integrated, flush-wall, aero-ramp-fuel-injector/plasma-torch igniter and flame propagation system for supersonic combustion applications with hydrocarbon fuels was developed and tested. The main goal of this project was to develop a device which could be used to demonstrate that the correct placement of a plasma-torch-igniter/flame-holder in the wake of the fuel jets of an aero-ramp injector array could make sustained, efficient supersonic combustion with low losses and thermal loading possible in a high enthalpy environment. The first phase of the research effort was conducted at Mach 3.0 at a static pressure and temperature of 0.19 atm and 101 K. This phase involved component analyses to improve on the designs of the aero-ramp and plasma-torch as well as address integration and incorporation difficulties. The information learned from these experiments lead to the creation of the first prototype integrated aero-ramp/plasma torch design featuring a new simplified four-hole aero-ramp design. The second phase of the project consisted of experiments at Mach 2.4 involving a cold-flow mixing evaluation of the new aero-ramp design and a resizing of the device for incorporation into a scramjet flow path test rig at the Air Force Research Laboratories (AFRL). Experiments were performed at a static pressure and temperature of 0.25 atm and 131 K, and at injector-jet to freestream momentum flux ratios ranging from 1.0 to 3.3. Results showed the aero-ramp to mix at a considerably faster rate than the injector used in the AFRL baseline combustor configuration due to high levels of vorticity created by the injector array. The last phase of the research involved testing the final device design in a cold-flow environment at Mach 2.4 with ethylene fuel injection and an operational plasma torch with methane, nitrogen, a 90-percent nitrogen 10-percent hydrogen (by volume) mixture, and air feedstock gases. Experiments were performed with injector jet to freestream momentum

  2. Programmer's guide to the fuzzy logic ramp metering algorithm : software design, integration, testing, and evaluation

    Science.gov (United States)

    2000-02-01

    A Fuzzy Logic Ramp Metering Algorithm was implemented on 126 ramps in the greater Seattle area. This report documents the implementation of the Fuzzy Logic Ramp Metering Algorithm at the Northwest District of the Washington State Department of Transp...

  3. Safety and operational performance evaluation of four types of exit ramps on Florida's freeways (final report).

    Science.gov (United States)

    2010-12-01

    This project mainly focuses on exit ramp performance analysis of safety and operations. In addition, issues of advance guide sign for exit ramp are also mentioned. : Safety analysis evaluates safety performances of different exit ramps used in Florid...

  4. Fast current ramp experiments on TFTR

    International Nuclear Information System (INIS)

    Fredrickson, E.D.; McGuire, K.; Goldston, R.J.

    1987-05-01

    Electron heat transport on TFTR and other tokamaks is several orders of magnitude larger than neoclassical calculations would predict. Despite considerable effort, there is still no clear theoretical understanding of this anomalous transport. The electron temperature profile T/sub e/(r), shape has shown a marked consistency on many machines, including TFTR, for a wide range of plasma parameters and heating profiles. This could be an important clue as to the process responsible for this enhanced thermal transport. In this paper 'profile consistency' in TFTR is described and an experiment which uses a fast current ramp to transiently decouple the current density profile J(r), and the T/sub e/(r) profiles is discussed. From this experiment the influence of J(r) on electron temperature profile consistency can be determined

  5. Energy-efficient operation of a booster RF system for Taiwan light source operated in top-up mode

    International Nuclear Information System (INIS)

    Yeh, Meng-Shu; Wang, Chaoen; Chang, Lung-Hai; Chung, Fu-Tsai; Yu, Tsung-Chi; Lin, Ming-Chyuan; Chen, Ling-Jhen; Yang, Tz-Te; Chang, Mei-Hsia; Lin, Yu-Han; Tsai, Ming-Hsun; Lo, Chih-Hung; Liu, Zong-Kai

    2015-01-01

    Contemporary light sources operate in a top-up mode to maintain their photon intensity quasi-constant so as to improve significantly the thermal stability of the photon beam and to maximize ultimately the average photon flux at a designed maximum operational beam current. Operating in a top-up mode requires frequent beam injection from the synchrotron booster to the storage ring of the light source, but the injection intervals occupy only a tiny portion of the operational time of the integrated machine. To maintain a high operational reliability, the booster RF system practically operates necessarily under injection conditions around the clock and consumes full electric power whether during top-up injection or not. How to decrease the power consumption of the booster RF system during its stand-by time but not to sacrifice the reliability and availability of the RF system is obviously of fundamental interest for routine operation of the light source in a top-up mode. Here, an energy-efficient operation of a booster RF system adaptive to top-up operation of a light source is proposed that has been developed, realized and integrated into the booster RF system of the Taiwan Light Source (TLS), and routinely operated since the end of year 2008. The klystron cathode current and RF gap voltage of the booster's accelerating RF cavity are both periodically modulated to adapt the injection rhythm during top-up operation, which results in decreased consumption of electric power of the booster RF system by more than 78%. The impact on the reliability and availability of the booster RF system has been carefully monitored during the past five operational years, delivering more than 5000 h scheduled user beam time per year. The booster RF system retains its excellent reliability and availability as previously. Neither a decrease of the service time nor an induced reliability issue from the klystron or any high-power high-voltage component of the transmitter has been

  6. Phase transition of a new lattice hydrodynamic model with consideration of on-ramp and off-ramp

    Science.gov (United States)

    Zhang, Geng; Sun, Di-hua; Zhao, Min

    2018-01-01

    A new traffic lattice hydrodynamic model with consideration of on-ramp and off-ramp is proposed in this paper. The influence of on-ramp and off-ramp on the stability of the main road is uncovered by theoretical analysis and computer simulation. Through linear stability theory, the neutral stability condition of the new model is obtained and the results show that the unstable region in the phase diagram is enlarged by considering the on-ramp effect but shrunk with consideration of the off-ramp effect. The mKdV equation near the critical point is derived via nonlinear reductive perturbation method and the occurrence of traffic jamming transition can be described by the kink-antikink soliton solution of the mKdV equation. From the simulation results of space-time evolution of traffic density waves, it is shown that the on-ramp can worsen the traffic stability of the main road but off-ramp is positive in stabilizing the traffic flow of the main road.

  7. Space Launch System Accelerated Booster Development Cycle

    Science.gov (United States)

    Arockiam, Nicole; Whittecar, William; Edwards, Stephen

    2012-01-01

    With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study

  8. Maximum Current Ramp Rates, Required Accuracies and Protection for the Corrector Circuits

    CERN Document Server

    Brüning, Oliver Sim

    2001-01-01

    Although single corrector magnets are designed to be self-protected in case of a quench, the protection of some arc corrector magnets connected in series requires the installation of resistors parallel to the magnet to avoid overheating of the super-conducting wire or an unacceptable voltage level. The installation of a parallel resistor has an impact during the current ramp as a leakage current flows via the resistor due to the inductive voltage over the magnet. The required ramp rates and accuracy of the corrector excitations have been evaluated to check whether the leakage current is acceptable. If the leakage current is too high the power converter control might have to compensate for this effect. The additional heat load that appears due to the leakage current must be considered and stay within the allowed cryogenic-power budget. This note summarises the maximum current ramp rate and accuracies as well as the required value of parallel protection resistors for the LHC corrector circuits (MCS, MS, MQT, MQ...

  9. Investigation of the McDonnell-Douglas orbiter and booster shuttle models in proximity at Mach numbers 2.0 to 6.0. Volume 7: Proximity data at Mach 4 and 6, interference free and launch vehicle data

    Science.gov (United States)

    Trimmer, L. L.; Love, D. A.; Decker, J. P.; Blackwell, K. L.; Strike, W. T.; Rampy, J. M.

    1972-01-01

    Aerodynamic data obtained from a space shuttle abort stage separation wind tunnel test are presented. The .00556 scale models of the orbiter and booster configuration were tested in close proximity using dual balances during the time period of April 21 to April 27 1971. Data were obtained for both booster and orbiter over an angle of attack range from -10 to 10 deg for zero degree sideslip angle. The models were tested at several relative incidence angles and separation distances and power conditions. Plug nozzles utilizing air were used to simulate booster and orbiter plumes at various altitudes along a nominal ascent trajectory. Powered conditions were 100, 50, 25 and 0 percent of full power for the orbiter and 100, 50 and 0 percent of full power for the booster. Pitch control effectiveness data were obtained for both booster and orbiter with power on and off. In addition, launch vehicle data with and without booster power were obtained utilizing a single balance in the booster model. Data were also obtained with the booster canard off in close proximity and for the launch configuration.

  10. Inter-Organisational Coordination in Ramp-Up Execution

    DEFF Research Database (Denmark)

    Christensen, Irene; Karlsson, Christer

    While fast product development with early prototyping and reduction of both cycle time and lead time are major concerns, there is little research on ramp up management. This paper examines the structural complexity of the ramp-up processes including the interactions with suppliers and analyses...... the degree of fragmentation in the process planning and execution. Resource dependence theory (RDT) is used as central explanatory framework for inter-organisational interdependencies formation throughout the planning and execution of the ramp-up activities and milestones. This study aims at exploring inter...

  11. Cabling design of booster and storage ring construction progress of TPS

    Science.gov (United States)

    Wong, Y.-S.; Liu, K.-B.; Liu, C.-Y.; Wang, b.-S.

    2017-06-01

    The 2012 Taiwan Photon Source (TPS) cable construction project started after 10 months to complete the cable laying and installation of power supply. The circumference of the booster ring (BR) is 496.8 m, whereas that of the storage ring (SR) is 518.4 m. Beam current is set to 500 mA at 3.3 GeV. The paper on grounding systems discusses the design of the ground wire (cabling tray. The flow and size of the ground current are carefully evaluated to avoid grounded current from flowing everywhere, which causes interference problems. In the design of the TPS, special shielding will be established to isolate the effects of electromagnetic interference on the magnet and ground current. Booster ring dipoles are connected by a series of 54-magnet bending dipole; the cable size of its stranded wire measures 250 mm2, with a total length of 5000 m. Booster ring and storage ring quadrupoles have 150 magnets; the cable size of their stranded wire is 250 mm2, with a total length of 17000 m. Storage ring dipole consists of 48 magnets; the cable size of its stranded wire is 325 mm2, with a total length of 6000 m. This study discusses the power supply cabling design of the storage ring and booster ring construction progress of TPS. The sections of this paper are divided into discussions of the construction of the control and instrument area, cabling layout of booster ring and storage ring, as well as the installation and commission machine. This study also discusses the use of a high-impedance meter to determine the effect of cabling insulation and TPS power supply machine on energy transfer to ensure the use of safe and correct magnet.

  12. LMFBR with booster pump in pumping loop

    International Nuclear Information System (INIS)

    Rubinstein, H.J.

    1975-01-01

    A loop coolant circulation system is described for a liquid metal fast breeder reactor (LMFBR) utilizing a low head, high specific speed booster pump in the hot leg of the coolant loop with the main pump located in the cold leg of the loop, thereby providing the advantages of operating the main pump in the hot leg with the reliability of cold leg pump operation

  13. Measuring target for the PS Booster

    CERN Multimedia

    1971-01-01

    The measuring target for the PS Booster (originally 800 MeV, now 1.4 GeV). It measures the size of the beam by destroying all particles with amplitudes greater than the size of the fork, the position and width of which are adjustable. The plunging time is only 20 ms and the acceleration at the tip of the fork reaches 90 g. The servo-controlled linear motor is shown detached from the mechanism. See also 7602008.

  14. Evolution of solid rocket booster component testing

    Science.gov (United States)

    Lessey, Joseph A.

    1989-01-01

    The evolution of one of the new generation of test sets developed for the Solid Rocket Booster of the U.S. Space Transportation System. Requirements leading to factory checkout of the test set are explained, including the evolution from manual to semiautomated toward fully automated status. Individual improvements in the built-in test equipment, self-calibration, and software flexibility are addressed, and the insertion of fault detection to improve reliability is discussed.

  15. SNS RING STUDY AT THE AGS BOOSTER

    International Nuclear Information System (INIS)

    ZHANG, S.Y.; AHRENS, L.; BEEBE-WANG, J.; BLASKIEWICZ, M.; FEDOTOV, A.; GARDNER, C.; LEE, Y.Y.; LUCCIO, A.; MALITSKY, N.; ROSER, T.; WENG, W.T.; WEI, J.; ZENO, K.; REECE, K.; WANG, J.G.

    2000-01-01

    During the g-2 run at the BNL AGS in early 2000, a 200 MeV storage-ring-like magnetic cycle has been set-up and tuned at the Booster in preparing for the Spallation Neutron Source (SNS) accumulator ring study. In this article, we report the progress of the machine set-up, tuning, some preliminary studies, and the future plan

  16. Forward ramp and Twin Peaks - 3D

    Science.gov (United States)

    1997-01-01

    A lander petal and the forward ramp are featured in this image, taken by the Imager for Mars Pathfinder (IMP) on Sol 3. 3D glasses are necessary to identify surface detail. There are several prominent rocks, including Wedge at left; Shark, Half-Dome, and Pumpkin in the background; and Flat Top and Little Flat Top at center.Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is an operating division of the California Institute of Technology (Caltech). The Imager for Mars Pathfinder (IMP) was developed by the University of Arizona Lunar and Planetary Laboratory under contract to JPL. Peter Smith is the Principal Investigator.Click below to see the left and right views individually. [figure removed for brevity, see original site] Left [figure removed for brevity, see original site] Right

  17. LHC Report: Ramp-up complete

    CERN Multimedia

    Mike Lamont for the LHC Team

    2012-01-01

    The intensity ramp-up outlined in the last Bulletin continued more or less as planned, with some steady running with 1092 bunches followed by the final step-up to 1380 – the maximum number of bunches for the year.   Monday, 16 April was spent performing luminosity calibration. Under carefully controlled conditions and a special beam configuration, the experiments' luminosity measurements were calibrated against a measurement of the accelerator’s absolute luminosity obtained with Van der Meer scans. These scans give the beam sizes at the interaction point which, together with an accurate measurement of the beam and bunch currents (and other more subtle considerations), allow a precise measurement of the absolute luminosity. With the Van der Meer scans out of the way, the final step-up in the number of bunches to 1380 was made. This has resulted in an average peak luminosity of around 5.6x1033 cm-2s-1 in the general-purpose detectors (ATLAS and CMS have yet to publish th...

  18. Accelerating Science Driven System Design With RAMP

    Energy Technology Data Exchange (ETDEWEB)

    Wawrzynek, John [Univ. of California, Berkeley, CA (United States)

    2015-05-01

    Researchers from UC Berkeley, in collaboration with the Lawrence Berkeley National Lab, are engaged in developing an Infrastructure for Synthesis with Integrated Simulation (ISIS). The ISIS Project was a cooperative effort for “application-driven hardware design” that engages application scientists in the early parts of the hardware design process for future generation supercomputing systems. This project served to foster development of computing systems that are better tuned to the application requirements of demanding scientific applications and result in more cost-effective and efficient HPC system designs. In order to overcome long conventional design-cycle times, we leveraged reconfigurable devices to aid in the design of high-efficiency systems, including conventional multi- and many-core systems. The resulting system emulation/prototyping environment, in conjunction with the appropriate intermediate abstractions, provided both a convenient user programming experience and retained flexibility, and thus efficiency, of a reconfigurable platform. We initially targeted the Berkeley RAMP system (Research Accelerator for Multiple Processors) as that hardware emulation environment to facilitate and ultimately accelerate the iterative process of science-driven system design. Our goal was to develop and demonstrate a design methodology for domain-optimized computer system architectures. The tangible outcome is a methodology and tools for rapid prototyping and design-space exploration, leading to highly optimized and efficient HPC systems.

  19. Application of independent component analysis to Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Huang, X.B.; Lee, S.Y.; Prebys, E.; Tomlin, R.; /Indiana U. /Fermilab

    2005-01-01

    Autocorrelation is applied to analyze sets of finite-sampling data such as the turn-by-turn beam position monitor (BPM) data in an accelerator. This method of data analysis, called the independent component analysis (ICA), is shown to be a powerful beam diagnosis tool for being able to decompose sampled signals into its underlying source signals. They find that the ICA has an advantage over the principle component analysis (PCA) used in the model-independent analysis (MIA) in isolating independent modes. The tolerance of the ICA method to noise in the BPM system is systematically studied. The ICA is applied to analyze the complicated beam motion in a rapid-cycling booster synchrotron at the Fermilab. Difficulties and limitations of the ICA method are also discussed.

  20. Electrical breakdown in thin oxides during bias-temperature ramps

    International Nuclear Information System (INIS)

    Fleetwood, D.M.; Riewe, Leonard Charles; Winokur, Peter S.; Sexton, Frederick W.

    2000-01-01

    Electrical breakdown in thin oxides is assessed by a new bias-temperature ramp technique. No significant effect of radiation exposure on breakdown is observed for high quality thermal and nitrided oxides, up to 20 Mrad(SiO 2 )

  1. Phylogenetic Assessment Of Arthrocnemum Macrostachyum (Chenopodiaceae Genotypes, Using Ramp Markers

    Directory of Open Access Journals (Sweden)

    Saleh Basel

    2015-12-01

    Full Text Available Random amplified microsatellite polymorphism (RAMP marker technique was employed to test its usefulness for assessing phylogenetic relationships in three genotypes of Arthrocnemum macrostachyum (Moric. Moris. & Delponte from Syria. PCR reactions with 21 RAMP primer combinations (PCs distinguished 145 loci, 139 of which (95.862% were polymorphic. The (AG8TC/OPE18 primer combination generated the highest number of fragments (11 amplicons, and the (AC8T/OPE04 primer combination the fewest (4 amplicons. Average estimated polymorphic information content (PIC was 0.431, with an average marker index (MI of 2.836. Analysis by the unweighted pair group method using arithmetic averages (UPGMA was performed and a dendrogram was constructed. UPGMA cluster analysis based on RAMP markers distinguished genotype 2, suggested here to be a subspecies, from genotypes 1 and 3. In this study the RAMP marker method proved to be a reliable tool for discriminating and estimating genetic diversity within A. macrostachyum.

  2. Novel Surveillance Technologies for Airport Ramp Area Operations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the current research is to develop the concept, algorithms and software necessary for enabling a novel surveillance system for airports ramp areas....

  3. MRI can accurately detect meniscal ramp lesions of the knee.

    Science.gov (United States)

    Arner, Justin W; Herbst, Elmar; Burnham, Jeremy M; Soni, Ashish; Naendrup, Jan-Hendrik; Popchak, Adam; Fu, Freddie H; Musahl, Volker

    2017-12-01

    Posterior horn meniscal tears are commonly found in conjunction with anterior cruciate ligament (ACL) injury. Some believe tears in the posterior meniscocapsular zone, coined ramp lesions, are important to knee stability. The purpose of this study was to determine whether pre-operative MRI evaluation was able to accurately and reproducibly identify ramp lesions. Three blinded reviewers assessed MRIs twice for the presence of ramp lesions in patients undergoing ACL reconstruction. Sensitivity, specificity, negative predictive value, and positive predictive value for MRI were calculated based on arthroscopic diagnosis of a ramp lesion. Intra-class correlation coefficient was calculated to assess intra- and interobserver reliability of the MRI assessment between the three examiners. Significance was set at p lesions, while the other 77 had other meniscal pathology. Sensitivity of detecting a ramp lesion on MRI ranged from 53.9 to 84.6%, while specificity was 92.3-98.7%. Negative predictive value was 91.1-97.4%, while positive predictive value was 50.0-90.0%. Inter-rater reliability between three reviewers was moderate at 0.56. The observers had excellent intra-rater reliability ranging from 0.75 to 0.81. This study demonstrates high sensitivity and excellent specificity in detecting meniscal ramp lesions on MRI. Ramp lesions are likely more common and may have greater clinical implications than previously appreciated; the outcomes of untreated lesions must be investigated. Pre-operative identification of ramp lesions may aid clinicians in surgical planning and patient education to improve outcomes by addressing pathology which may have otherwise been missed. III.

  4. Oil Sands Regional Aquatics Monitoring Program (RAMP) 5 year report

    International Nuclear Information System (INIS)

    Fawcett, K.

    2003-05-01

    This 5 year report outlined and examined the activities of the Regional Aquatics Monitoring Program (RAMP) from its introduction in 1997 up to 2001. The RAMP is a multi-stakeholder program comprised of industry and government representatives as well as members of aboriginal groups and environmental organizations. The objectives of RAMP are to monitor aquatic environments in the oil sands region in order to allow for assessment of regional trends and cumulative effects, as well as to provide baseline data against which impact predictions of recent environmental impact assessments can be verified. Scientific programs conducted as part of RAMP during the 5-year period included water quality and sediment quality analyses; fish monitoring; benthic communities monitoring; water quality and aquatic vegetation analyses of wetlands; and hydrology and climate monitoring. RAMP's programs have expanded annually in scope as a result of increased oil sands development in the region. This report provided outlines of RAMP's individual program objectives and organizational structures, as well as details of all studies conducted for each year. Data were collected for all major study areas were presented, and program methodologies for assessing and identifying trends were outlined. refs., tabs., figs

  5. PDR with a foot-mounted IMU and ramp detection.

    Science.gov (United States)

    Jiménez, Antonio R; Seco, Fernando; Zampella, Francisco; Prieto, José C; Guevara, Jorge

    2011-01-01

    The localization of persons in indoor environments is nowadays an open problem. There are partial solutions based on the deployment of a network of sensors (Local Positioning Systems or LPS). Other solutions only require the installation of an inertial sensor on the person's body (Pedestrian Dead-Reckoning or PDR). PDR solutions integrate the signals coming from an Inertial Measurement Unit (IMU), which usually contains 3 accelerometers and 3 gyroscopes. The main problem of PDR is the accumulation of positioning errors due to the drift caused by the noise in the sensors. This paper presents a PDR solution that incorporates a drift correction method based on detecting the access ramps usually found in buildings. The ramp correction method is implemented over a PDR framework that uses an Inertial Navigation algorithm (INS) and an IMU attached to the person's foot. Unlike other approaches that use external sensors to correct the drift error, we only use one IMU on the foot. To detect a ramp, the slope of the terrain on which the user is walking, and the change in height sensed when moving forward, are estimated from the IMU. After detection, the ramp is checked for association with one of the existing in a database. For each associated ramp, a position correction is fed into the Kalman Filter in order to refine the INS-PDR solution. Drift-free localization is achieved with positioning errors below 2 meters for 1,000-meter-long routes in a building with a few ramps.

  6. Design of 3 GeV booster ring lattice

    Energy Technology Data Exchange (ETDEWEB)

    Etisken, O., E-mail: ozgur.etisken@cern.ch; Ciftci, A. K., E-mail: abbas.kenan.ciftci@cern.ch [Ankara University, Ankara (Turkey)

    2016-03-25

    The aim of this study is to design of a 3 GeV booster ring for the 3 GeV storage ring. Electrons are needed to be accelerated to 3.0 GeV from 0.15 GeV energy. In this frame, we studied on two options for booster ring; a compact booster and the booster that shares the same tunnel with the storage ring. The lattice type has been chosen FODO for both options, lattice parameters are calculated, sextupole magnets are used to decrease dynamic aperture problem and dynamic aperture calculations are also made with considering of the necessary conditions. After designing and calculating of the parameters, these designs have been compared with each other. In addition to this comparison, these booster design parameters have been compared with some world centers design parameters and the reliability of the booster design is seen. Beam optics, OPA and Elegant simulation programs have been used in the study calculations.

  7. Wind-Ramp-Forecast Sensitivity to Closure Parameters in a Boundary-Layer Parametrization Scheme

    Science.gov (United States)

    Jahn, David E.; Takle, Eugene S.; Gallus, William A.

    2017-09-01

    Wind ramps are relatively large changes in wind speed over a period of a few hours and present a challenge for electric utilities to balance power generation and load. Failures of boundary-layer parametrization schemes to represent physical processes limit the ability of numerical models to forecast wind ramps, especially in a stable boundary layer. Herein, the eight "closure parameters" of a widely used boundary-layer parameterization scheme are subject to sensitivity tests for a set of wind-ramp cases. A marked sensitivity of forecast wind speed to closure-parameter values is observed primarily for three parameters that influence in the closure equations the depth of turbulent mixing, dissipation, and the transfer of kinetic energy from the mean to the turbulent flow. Reducing the value of these parameters independently by 25% or by 50% reduces the overall average in forecast wind-speed errors by at least 24% for the first two parameters and increases average forecast error by at least 63% for the third parameter. Doubling any of these three parameters increases average forecast error by at least 67%. Such forecast sensitivity to closure parameter values provides motivation to explore alternative values in the context of a stable boundary layer.

  8. Dimensionless Analysis on the Characteristics of Pneumatic Booster Valve with Energy Recovery

    Directory of Open Access Journals (Sweden)

    Fan Yang

    2016-01-01

    Full Text Available Factories are increasingly reducing their air supply pressures in order to save energy. Hence, there is a growing demand for pneumatic booster valves to overcome the local pressure deficits in modern pneumatic systems. To further improve energy efficiency, a new type of booster valve with energy recovery (BVER is proposed. The BVER principle is presented in detail, and a dimensionless mathematical model is established based on flow rate, gas state, and energy conservation. The mathematics model was transformed into a dimensionless model by accurately selecting the reference values. Subsequently the dimensionless characteristics of BVER were found. BVER energy efficiency is calculated based on air power. The boost ratio is found to be mainly affected by the operational parameters. Among the structural ones, the recovery/boost chamber area ratio and the sonic conductance of the chambers are the most influential. The boost ratio improves by 15%–25% compared to that of a booster valve without an energy recovery chamber. The efficiency increases by 5%–10% depending on the supply pressure. A mathematical model is validated by experiment, and this research provides a reference for booster valve optimisation and energy saving.

  9. The PS Booster's ejection kicker: full house.

    CERN Multimedia

    CERN PhotoLab

    1971-01-01

    The modules of the Booster's four-storied full-aperture kicker pretty much fill their vacuum tank (front cover removed). In the original 800 MeV version, the delay-type modules were pulsed at 30 kV from a Pulse-Forming-Network (PFN), yielding a field risetime as short as 60 ns. The fieldstrength was 0.1 T at a current of 1200 A. The modules are made from steel plates and ferrite slabs. The ferrite's high initial outgassing rate presented a serious vacuum problem for a long time.

  10. The superconducting linac booster at the ANU

    International Nuclear Information System (INIS)

    Weisser, D.C.

    1995-02-01

    This report outlines the progress of the installation of the superconducting Linac booster at the Australian National University. The Linac is based upon four modules, three of which contain three split-loop resonators. The fourth cryostat was intended to be a superbuncher and so houses only one resonator. The first stage of Linac operation will employ only three modules with 2 MV/m from each resonator. It is expected that the implementation of all nine modules, in subsequent stages, would boost beams by 18 MV/q. The project has fostered productive international collaboration between UK and Australian scientists. 1 tab., 6 figs

  11. Position pickup of the PS Booster

    CERN Multimedia

    CERN PhotoLab

    1975-01-01

    The beam position around the 4 rings of the PS Booster (originally 800 MeV, now 1.4 GeV), is measured with electrostatic pickups (PU). They consist of a ceramic cylinder forming part of the vacuum chamber, and, in order to save space, they are located inside the multipole lenses. The inside of the ceramic is coated with a metallic layer, into which the form of the electrodes was cut by computer-controlled micro-sandblasting. Each PU has a pair of horizontal and a pair of vertical electrodes, as well as a separate intensity-sensing circular electrode.

  12. Low Energy Electron Cooler for NICA Booster

    CERN Document Server

    Denisov, A P

    2017-01-01

    BINP has developed an electron cooler to increase the ion accumulation efficiency in the NICA (Nuclotron-based Ion Collider fAcility) heavy ion booster (JINR, Dubna). Adjustment of the cooler magnetic system provides highly homogeneous magnetic field in the cooling section B trans/B long ≤ 4∙10-5 which is vital for efficient electron cooling. First experiments with an electron beam performed at BINP demonstrated the target DC current of 500 mA and electron energy 6 keV.

  13. The low energy booster project status

    International Nuclear Information System (INIS)

    Tuttle, G.W.

    1993-05-01

    In order to achieve the required injection momentum, the Superconducting Super Collider (SSC) has an accelerator chain comprised of a Linear Accelerator and three synchrotrons. The Low Energy Booster (LEB) is the first synchrotron in this chain. The LEB project has made significant progress in the development of major subsystems and conventional construction. This paper briefly reviews the performance requirements of the LEB and describes significant achievements in each of the major subsystem areas. Highlighted among these achievements are the LEB foreign collaborations with the Budker Institute of Nuclear Physics (BINP) located in Novosibirsk, Russia

  14. Commissioning and Early Operation for the NSLS-II Booster RF System

    Energy Technology Data Exchange (ETDEWEB)

    Marques, C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Cupolo, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Davila, P. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gao, F. [Brookhaven National Lab. (BNL), Upton, NY (United States); Goel, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Holub, B. [Brookhaven National Lab. (BNL), Upton, NY (United States); Kulpin, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); McDonald, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Oliva, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Papu, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ramirez, G. [Brookhaven National Lab. (BNL), Upton, NY (United States); Rose, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Sikora, R. [Brookhaven National Lab. (BNL), Upton, NY (United States); Sorrentino, C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Towne, N. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-03

    The National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (BNL) is a third generation 3GeV, 500mA synchrotron light source. We discuss the booster synchrotron RF system responsible for providing power to accelerate an electron beam from 200MeV to 3GeV. The RF system design and construction are complete and is currently in the operational phase of the NSLS-II project. Preliminary operational data is also discussed.

  15. Magnetic booster fast ignition macron accelerator

    Science.gov (United States)

    Winterberg, F.

    2006-11-01

    A new fast ignition scheme was recently proposed where the ignition is done by the impact of a small solid projectile accelerated to velocities in excess of 108cm/s, with the acceleration done in two steps: first, by laser ablation of a flyer plate, and second by injecting the flyer plate into a conical duct. The two principal difficulties of this scheme are as follows: first, the required large mass ratio for the laser ablation rocket propelled flyer plate, and second, the Rayleigh-Taylor instability of the flyer plate during its implosive compression in the conical duct. To overcome these difficulties, it is suggested to accelerate a projectile by a magnetic fusion booster stage, made up of a dense, wall-confined magnetized plasma brought to thermonuclear temperatures. After ignition, this plasma undergoes a thermonuclear excursion greatly increasing its pressure, resulting in the explosion of a weakened segment of the wall, with the segment becoming a fast moving projectile. The maximum velocity this projectile can reach is the velocity of sound of the booster stage plasma, which at a temperature of 108K is of the order 108cm/s.

  16. Magnetic booster fast ignition macron accelerator

    International Nuclear Information System (INIS)

    Winterberg, F.

    2006-01-01

    A new fast ignition scheme was recently proposed where the ignition is done by the impact of a small solid projectile accelerated to velocities in excess of 10 8 cm/s, with the acceleration done in two steps: first, by laser ablation of a flyer plate, and second by injecting the flyer plate into a conical duct. The two principal difficulties of this scheme are as follows: first, the required large mass ratio for the laser ablation rocket propelled flyer plate, and second, the Rayleigh-Taylor instability of the flyer plate during its implosive compression in the conical duct. To overcome these difficulties, it is suggested to accelerate a projectile by a magnetic fusion booster stage, made up of a dense, wall-confined magnetized plasma brought to thermonuclear temperatures. After ignition, this plasma undergoes a thermonuclear excursion greatly increasing its pressure, resulting in the explosion of a weakened segment of the wall, with the segment becoming a fast moving projectile. The maximum velocity this projectile can reach is the velocity of sound of the booster stage plasma, which at a temperature of 10 8 K is of the order 10 8 cm/s

  17. Off-ramps and on-ramps: keeping talented women on the road to success.

    Science.gov (United States)

    Hewlett, Sylvia Ann; Luce, Carolyn Buck

    2005-03-01

    Most professional women step off the career fast track at some point. With children to raise, elderly parents to care for, and other pulls on their time, these women are confronted with one off-ramp after another. When they feel pushed at the same time by long hours and unsatisfying work, the decision to leave becomes even easier. But woe to the woman who intends for that exit to be temporary. The on-ramps for professional women to get back on track are few and far between, the authors confirm. Their new survey research reveals for the first time the extent of the problem--what percentage of highly qualified women leave work and for how long, what obstacles they face coming back, and what price they pay for their time-outs. And what are the implications for corporate America? One thing at least seems clear: As market and economic factors align in ways guaranteed to make talent constraints and skill shortages huge issues again, employers must learn to reverse this brain drain. Like it or not, large numbers of highly qualified, committed women need to take time out of the workplace. The trick is to help them maintain connections that will allow them to reenter the workforce without being marginalized for the rest of their lives. Strategies for building such connections include creating reduced-hour jobs, providing flexibility in the workday and in the arc of a career, removing the stigma of taking time off, refusing to burn bridges, offering outlets for altruism, and nurturing women's ambition.

  18. 76 FR 26983 - Improving Wireless Coverage Through the Use of Signal Boosters

    Science.gov (United States)

    2011-05-10

    ... boosters must detect feedback or oscillation (such as may result from insufficient isolation between the... buildings, tunnels, parking structures, etc., but allow Class B signal boosters to be connected to external... booster use should be [[Page 26989

  19. Meniscal Ramp Lesions: Anatomy, Incidence, Diagnosis, and Treatment.

    Science.gov (United States)

    Chahla, Jorge; Dean, Chase S; Moatshe, Gilbert; Mitchell, Justin J; Cram, Tyler R; Yacuzzi, Carlos; LaPrade, Robert F

    2016-07-01

    Meniscal ramp lesions are more frequently associated with anterior cruciate ligament (ACL) injuries than previously recognized. Some authors suggest that this entity results from disruption of the meniscotibial ligaments of the posterior horn of the medial meniscus, whereas others support the idea that it is created by a tear of the peripheral attachment of the posterior horn of the medial meniscus. Magnetic resonance imaging (MRI) scans have been reported to have a low sensitivity, and consequently, ramp lesions often go undiagnosed. Therefore, to rule out a ramp lesion, an arthroscopic evaluation with probing of the posterior horn of the medial meniscus should be performed. Several treatment options have been reported, including nonsurgical management, inside-out meniscal repair, or all-inside meniscal repair. In cases of isolated ramp lesions, a standard meniscal repair rehabilitation protocol should be followed. However, when a concomitant ACL reconstruction (ACLR) is performed, the rehabilitation should follow the designated ACLR postoperative protocol. The purpose of this article was to review the current literature regarding meniscal ramp lesions and summarize the pertinent anatomy, biomechanics, diagnostic strategies, recommended treatment options, and postoperative protocol.

  20. Measuring modulated luminescence using non-modulated stimulation: Ramping the sample period

    DEFF Research Database (Denmark)

    Poolton, N.R.J.; Bøtter-Jensen, L.; Andersen, C.E.

    2003-01-01

    . Directly analogous results to LM-OSL can, however, be achieved with non-modulated excitation sources, by ramping the sample period (RSP) of luminescence detection. RSP-OSL has the distinct advantage over LM-OSL in that, since the excitation remains at full power, data accumulation times (that can...... be considerable) can be reduced by typically 50%. RSP methods are universally applicable and can be employed, for example, where the excitation source is constant heat, rather than light: here, iso-thermal decay of phosphorescence becomes recorded as a sequence of peaks, corresponding to de-trapping of charge...

  1. Identifying strategies to improve the effectiveness of booster seat laws

    Science.gov (United States)

    2008-05-01

    The objective of this project was to identify strategies to improve the effectiveness of booster seat laws. The project explored the possible factors that relate to the use and nonuse of booster seats, and examined the attitudes of law enforcement of...

  2. Enhancing the accelerated beam current in the booster synchrotron ...

    Indian Academy of Sciences (India)

    Based on these measured beam parameters, beam optics of a transport line was optimized and its results are alsodiscussed in this paper. This beam transport line is used to transport the electron beam from the 20MeV microtron to the booster synchrotron. The booster synchrotron works as a main injector for Indus-1 and ...

  3. An overview of Booster and AGS Polarized Proton Operations during Run 17

    Energy Technology Data Exchange (ETDEWEB)

    Zeno, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-10-11

    There were only a few differences in the setup between this year’s Polarized Proton run and the previous one (Run 15). Consequently, this note will focus on these differences as well as a few more notable studies done during the course of the run. This year, the Booster input intensity was kept around 7e11 for the majority of the run whereas in Run 15 it was kept around 9e11. It was lowered because there was some indication that the source polarization was higher with this lower input. Some of the polarization measurements that motivated this change will be discussed. Both the emittance and polarization on the AGS flattop show intensity dependence, thought to be related to the peak current, especially early in the AGS acceleration ramp. In Run 15, the AGS Rf was configured for h=8, but in this run h=6 was used to reduce the peak current and also to allow for the possibility of using a dual harmonic to reduce it further. Eventually, a dual harmonic configuration was used for the first 100 ms or so of the AGS acceleration cycle. Two cavities were set to h=12 and phased differently than the other 8 to accomplish this. Quad pumping was also used at Booster extraction to make the bunch injected into the AGS wider in order to match the dual harmonic bucket right at injection. This configuration, which was used for the majority of the run, will be described. Measurements of the intensity dependence of the transverse emittance and polarization with and without it will be compared.

  4. Superconducting racetrack booster for the ion complex of MEIC

    Energy Technology Data Exchange (ETDEWEB)

    Filatov, Yu [Joint Inst. for Nuclear Research (JINR), Dubna (Russian Federation); Moscow Inst. of Physics and Technology (MIPT), Moscow (Russian Federation); Kondratenko, A. M. [Science and Technique Laboratory ' Zaryad' , 630090, Novosibirsk, Russia; Kondratenko, M. A. [Science and Technique Laboratory ' Zaryad' , 630090, Novosibirsk, Russia; Kovalenko, A. [Joint Inst. for Nuclear Research (JINR), Dubna (Russian Federation); Derbenev, Yaroslav S. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Lin, Fanglei [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Morozov, Vasiliy S. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Zhang, Yuhong [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2016-02-01

    The current design of the Medium-energy Electron-Ion Collider (MEIC) project at Jefferson lab features a single 8 GeV/c figure-8 booster based on super-ferric magnets. Reducing the circumference of the booster by switching to a racetrack design may improve its performance by limiting the space charge effect and lower its cost. We consider problems of preserving proton and deuteron polarizations in a superconducting racetrack booster. We show that using magnets based on hollow high-current NbTi composite superconducting cable similar to those designed at JINR for the Nuclotron guarantees preservation of the ion polarization in a racetrack booster up to 8 GeV/c. The booster operation cycle would be a few seconds that would improve the operating efficiency of the MEIC ion complex.

  5. Design and Evaluation of a Clock Multiplexing Circuit for the SSRL Booster Accelerator Timing System - Oral Presentation

    Energy Technology Data Exchange (ETDEWEB)

    Araya, Million; /SLAC

    2015-08-25

    SPEAR3 is a 234 m circular storage ring at SLAC’s synchrotron radiation facility (SSRL) in which a 3 GeV electron beam is stored for user access. Typically the electron beam decays with a time constant of approximately 10hr due to electron lose. In order to replenish the lost electrons, a booster synchrotron is used to accelerate fresh electrons up to 3GeV for injection into SPEAR3. In order to maintain a constant electron beam current of 500mA, the injection process occurs at 5 minute intervals. At these times the booster synchrotron accelerates electrons for injection at a 10Hz rate. A 10Hz 'injection ready' clock pulse train is generated when the booster synchrotron is operating. Between injection intervalswhere the booster is not running and hence the 10 Hz ‘injection ready’ signal is not present-a 10Hz clock is derived from the power line supplied by Pacific Gas and Electric (PG&E) to keep track of the injection timing. For this project I constructed a multiplexing circuit to 'switch' between the booster synchrotron 'injection ready' clock signal and PG&E based clock signal. The circuit uses digital IC components and is capable of making glitch-free transitions between the two clocks. This report details construction of a prototype multiplexing circuit including test results and suggests improvement opportunities for the final design.

  6. Design and Evaluation of a Clock Multiplexing Circuit for the SSRL Booster Accelerator Timing System - Final Paper

    Energy Technology Data Exchange (ETDEWEB)

    Araya, Million

    2015-08-21

    SPEAR3 is a 234 m circular storage ring at SLAC’s synchrotron radiation facility (SSRL) in which a 3 GeV electron beam is stored for user access. Typically the electron beam decays with a time constant of approximately 10hr due to electron lose. In order to replenish the lost electrons, a booster synchrotron is used to accelerate fresh electrons up to 3GeV for injection into SPEAR3. In order to maintain a constant electron beam current of 500mA, the injection process occurs at 5 minute intervals. At these times the booster synchrotron accelerates electrons for injection at a 10Hz rate. A 10Hz 'injection ready' clock pulse train is generated when the booster synchrotron is operating. Between injection intervals-where the booster is not running and hence the 10 Hz ‘injection ready’ signal is not present-a 10Hz clock is derived from the power line supplied by Pacific Gas and Electric (PG&E) to keep track of the injection timing. For this project I constructed a multiplexing circuit to 'switch' between the booster synchrotron 'injection ready' clock signal and PG&E based clock signal. The circuit uses digital IC components and is capable of making glitch-free transitions between the two clocks. This report details construction of a prototype multiplexing circuit including test results and suggests improvement opportunities for the final design.

  7. PDR with a Foot-Mounted IMU and Ramp Detection

    Directory of Open Access Journals (Sweden)

    Jorge Guevara

    2011-09-01

    Full Text Available The localization of persons in indoor environments is nowadays an open problem. There are partial solutions based on the deployment of a network of sensors (Local Positioning Systems or LPS. Other solutions only require the installation of an inertial sensor on the person’s body (Pedestrian Dead-Reckoning or PDR. PDR solutions integrate the signals coming from an Inertial Measurement Unit (IMU, which usually contains 3 accelerometers and 3 gyroscopes. The main problem of PDR is the accumulation of positioning errors due to the drift caused by the noise in the sensors. This paper presents a PDR solution that incorporates a drift correction method based on detecting the access ramps usually found in buildings. The ramp correction method is implemented over a PDR framework that uses an Inertial Navigation algorithm (INS and an IMU attached to the person’s foot. Unlike other approaches that use external sensors to correct the drift error, we only use one IMU on the foot. To detect a ramp, the slope of the terrain on which the user is walking, and the change in height sensed when moving forward, are estimated from the IMU. After detection, the ramp is checked for association with one of the existing in a database. For each associated ramp, a position correction is fed into the Kalman Filter in order to refine the INS-PDR solution. Drift-free localization is achieved with positioning errors below 2 meters for 1,000-meter-long routes in a building with a few ramps.

  8. Effect of ramp-cavity on hydrogen fueled scramjet combustor

    Directory of Open Access Journals (Sweden)

    J.V.S. Moorthy

    2014-03-01

    Full Text Available Sustained combustion and optimization of combustor are the two challenges being faced by combustion scientists working in the area of supersonic combustion. Thorough mixing, lower stagnation pressure losses, positive thrust and sustained combustion are the key issues in the field of supersonic combustion. Special fluid mechanism is required to achieve good mixing. To induce such mechanisms in supersonic inflows, the fuel injectors should be critically shaped incurring less flow losses. Present investigations are focused on the effect of fuel injection scheme on a model scramjet combustor performance. Ramps at supersonic flow generate axial vortices that help in macro-mixing of fuel with air. Interaction of shocks generated by ramps with the fuel stream generates boro-clinic torque at the air & liquid fuel interface, enhancing micro-mixing. Recirculation zones present in cavities increase the residence time of the combustible mixture. Making use of the advantageous features of both, a ramp-cavity combustor is designed. The combustor has two sections. First, constant height section consists of a backward facing step followed by ramps and cavities on both the top and bottom walls. The ramps are located alternately on top and bottom walls. The complete combustor width is utilized for the cavities. The second section of the combustor is diverging area section. This is provided to avoid thermal choking. In the present work gaseous hydrogen is considered as fuel. This study was mainly focused on the mixing characteristics of four different fuel injection locations. It was found that injecting fuel upstream of the ramp was beneficial from fuel spread point of view.

  9. Analysis of failed ramps during the RHIC FY09 run

    Energy Technology Data Exchange (ETDEWEB)

    Minty, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2014-08-15

    The Relativistic Heavy Ion Collider (RHIC) is a versatile accelerator that supports operation with polarized protons of up to 250 GeV and ions with up to 100 GeV/nucleon. During any running period, various operating scenarios with different particle species, beam energies or accelerator optics are commissioned. In this report the beam commissioning periods for establishing full energy beams (ramp development periods) from the FY09 run are summarized and, for the purpose of motivating further developments, we analyze the reasons for all failed ramps.

  10. Vacuum chamber eddy current correction coil for the AGS booster

    International Nuclear Information System (INIS)

    Danby, G.; Jackson, J.

    1988-01-01

    This paper reports on the AGS Booster injector that performs a variety of functions. Heavy ion acceleration requires a bakeable, ultra-high vacuum system (VC). Acceleration for intense proton beams requires rapid cycling (B ≤10T/sec). If straight forward heavy walled VC are used, the field perturbations due to eddy currents are large. The state of the art lattice has highly distributed lumped sextupoles capable of substantially correcting the induced field nonlinearity. Nevertheless, for the very highest space charge-intensity limits, it is desirable to have the capability to remove eddy current fields at the source. Correction coils attached to the outside of the VC cancel its current aberrations over the required good field aperture. These can be passively powered by transformer action, using two turn windings around the magnet yoke. Programmed power supplies can also be used. This inexpensive additional correction option uses a three turn per quadrant coil which follows the local contour of the VC. Transverse movements of several mms of the VC will have no beam optical effect since the large field aberrations and their corrections have the same displace coordinates. Experimental and computer studies will be presented, as well as mechanical and electrical design of a simple method of construction

  11. Beam tests on a proton linac booster for hadron therapy

    CERN Document Server

    De Martinis, C; Berra, P; Birattari, C; Calabretta, L; Crandall, K; Giove, D; Masullo, M R; Mauri, M; Rosso, E; Rovelli, A; Serafini, L; Szeless, Balázs; Toet, D Z; Vaccaro, Vittorio G; Weiss, M; Zennaro, R

    2002-01-01

    LIBO is a 3 GHz modular side-coupled proton linac booster designed to deliver beam energies up to 200 MeV, as required for the therapy of deep seated tumours. The injected beam of 50 to 70 MeV is produced by a cyclotron like those in several hospitals and research institutes. A full-scale prototype of the first module with an input/output energy of 62/74 MeV, respectively, was designed and built in 1999 and 2000. Full power RF tests were carried out successfully at CERN using a test facility at LIL at the end of the year 2000. In order to prove the feasibility of the acceleration process, an experimental setup with this module was installed at the INFN Laboratorio Nazionale del Sud (LNS) in Catania during 2001. The superconducting cyclotron provided the 62 MeV test beam. A compact solid-state RF modulator with a 4 MW klystron, made available by IBA-Scanditronix, was put into operation to power the linac. In this paper the main features of the accelerator are reviewed and the experimental results obtained duri...

  12. Vacuum chamber eddy current correction coil for the AGS Booster

    International Nuclear Information System (INIS)

    Danby, G.; Jackson, J.

    1988-01-01

    The AGS Booster injector will perform a variety of functions. Heavy ion acceleration requires a bakeable, ultra-high vacuum system (VC). Acceleration for intense proton beams requires rapid cycling (B /preceq/ 10T/sec). If straight forward heavy walled VC are used, the field perturbations due to eddy currents are large. The state of the art lattice has highly distributed lumped sextupoles capable of substantially correcting the induced field nonlinearity. Nevertheless, for the very highest space charge-intensity limits, it is desirable to have the capability to remove eddy current fields at the source. Correction coils attached to the outside of the VC cancel its current aberrations over the required good field aperture. These can be passively powered by transformer action, using two turn windings around the magnet yoke. Programmed power supplies can also be used. This inexpensive additional correction option uses a three turn per quadrant coil which follows the local contour of the VC. Transverse movements of several mms of the VC will have no beam optical effect since the large field aberrations and their corrections have the same displaced coordinates. Experimental and computer studies will be presented, as well as mechanical and electrical design of a simple method of construction. 6 figs

  13. R & D on Beam Injection and Bunching Schemes in the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Bhat, C. M. [Fermilab

    2016-01-01

    Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the next decade, the current 400 MeV normal conducting LINAC will be replaced by an 800 MeV superconducting LINAC (PIP-II) with an increased beam power >50% of the PIP design goal. Both in PIP and PIP-II era, the existing Booster is going to play a very significant role, at least for next two decades. In the meanwhile, we have recently developed an innovative beam injection and bunching scheme for the Booster called "early injection scheme" that continues to use the existing 400 MeV LINAC and implemented into operation. This scheme has the potential to increase the Booster beam intensity by >40% from the PIP design goal. Some benefits from the scheme have already been seen. In this paper, I will describe the basic principle of the scheme, results from recent beam experiments, our experience with the new scheme in operation, current status, issues and future plans. This scheme fits well with the current and future intensity upgrade programs at Fermilab.

  14. The AGS Booster beam loss monitor system

    International Nuclear Information System (INIS)

    Beadle, E.R.; Bennett, G.W.; Witkover, R.L.

    1991-01-01

    A beam loss monitor system has been developed for the Brookhaven National Laboratory Booster accelerator, and is designed for use with intensities of up to 1.5 x 10 13 protons and carbon to gold ions at 50-3 x 10 9 ions per pulse. This system is a significant advance over the present AGS system by improving the sensitivity, dynamic range, and data acquisition. In addition to the large dynamic range achievable, it is adaptively shifted when high losses are detected. The system uses up to 80 argon filled ion chambers as detectors, as well as newly designed electronics for processing and digitizing detector outputs. The hardware simultaneously integrates each detector output, interfaces to the beam interrupt systems, and digitizes all 80 channels to 21 bits at 170 KHz. This paper discuses the design, construction, and operation of the system. 4 refs., 2 figs

  15. Pulsed neutron source very intense, Booster

    International Nuclear Information System (INIS)

    Abbate, J.M.

    1978-09-01

    A compact Accelerator-Booster (fast, pulsed and modulate reactivity research reactor) is a new and appropriate conception to use as a very intense thermal neutrons source. Its definition and feasibility have been already described in several studies showing its relative advantages in comparison with others kinds of facilities. This work, wich is part of one of those studies, contains a general analysis on the meis facility parameters and core and shielding theoretical calculations. The following results were obtained: Selection and test of a calculation system suitable to use in compact fast reactors; Development a method to perform estimations in some safety and shielding problems and obtainment of adequate theoretical predictions on the general performance. Moreover, final results for importent parameters of the feasibility study and predesign (critical mass and volume, lifetime, etc.) and others related to the use of plutonium oxide as fuel are given and then evaluations of different basic functions are showed. (author) [es

  16. Superconducting linac booster for NSC Pelletron

    International Nuclear Information System (INIS)

    Roy, A.; Prakash, P.N.; Ajithkumar, B.P.; Ghosh, S.; Changrani, T.; Mehta, R.; Sarkar, A.; Muralidhar, S.; Dutt, R.N.; Kumar, M.; Shepard, K.W.; and others.

    1996-01-01

    The progress made in the heavy ion superconducting linac booster project for the Nuclear Science Centre Pelletron accelerator is overviewed. Prototypes of the accelerating structure have been fabricated at Argonne National Laboratory and undergone several diagnostic tests. In the first phase heavy ions up to mass 80 will be accelerated to energies above the Coulomb barrier and in the second phase the mass limit would be increased to 120. The subsystems of the project are the basic accelerating structures, the RF instrumentation and control, the cryogenic system and the beam optics. Preliminary designs for the buncher and linac cryostats have been made. Several prototypes of RF electronics and control modules have been fabricated and tested. (R.P.)

  17. Rf beam control for the AGS Booster

    Energy Technology Data Exchange (ETDEWEB)

    Brennan, J.M.

    1994-09-26

    RF beam control systems for hadron synchrotrons have evolved over the past three decades into an essentially standard design. The key difference between hadron and lepton machines is the absence of radiation damping and existence of significant frequency variation in the case of hadrons. Although the motion of the hadron in the potential well of the rf wave is inherently stable it is not strongly damped. Damping must be provided by electronic feedback through the accelerating system. This feedback is typically called the phase loop. The technology of the rf beam control system for the AGS Booster synchrotron is described. First, the overall philosophy of the design is explained in terms of a conventional servo system that regulates the beam horizontal position in the vacuum chamber. The concept of beam transfer functions is fundamental to the mathematics of the design process and is reviewed. The beam transfer functions required for this design are derived from first principles. An overview of the beam signal pick-ups and high level rf equipment is given. The major subsystems, the frequency program, the heterodyne system, and beam feedback loops, are described in detail. Beyond accelerating the beam, the rf system must also synchronize the bunches in the Booster to the buckets in the AGS before transfer. The technical challenge in this process is heightened by the need to accomplish synchronization while the frequency is still changing. Details of the synchronization system are given. This report is intended to serve two purposes. One is to document the hardware and performance of the systems that have been built. The other is to serve as a tutorial vehicle from which the non-expert can not only learn the details of this system but also learn the principles of beam control that have led to the particular design choices made.

  18. Rf beam control for the AGS Booster

    International Nuclear Information System (INIS)

    Brennan, J.M.

    1994-01-01

    RF beam control systems for hadron synchrotrons have evolved over the past three decades into an essentially standard design. The key difference between hadron and lepton machines is the absence of radiation damping and existence of significant frequency variation in the case of hadrons. Although the motion of the hadron in the potential well of the rf wave is inherently stable it is not strongly damped. Damping must be provided by electronic feedback through the accelerating system. This feedback is typically called the phase loop. The technology of the rf beam control system for the AGS Booster synchrotron is described. First, the overall philosophy of the design is explained in terms of a conventional servo system that regulates the beam horizontal position in the vacuum chamber. The concept of beam transfer functions is fundamental to the mathematics of the design process and is reviewed. The beam transfer functions required for this design are derived from first principles. An overview of the beam signal pick-ups and high level rf equipment is given. The major subsystems, the frequency program, the heterodyne system, and beam feedback loops, are described in detail. Beyond accelerating the beam, the rf system must also synchronize the bunches in the Booster to the buckets in the AGS before transfer. The technical challenge in this process is heightened by the need to accomplish synchronization while the frequency is still changing. Details of the synchronization system are given. This report is intended to serve two purposes. One is to document the hardware and performance of the systems that have been built. The other is to serve as a tutorial vehicle from which the non-expert can not only learn the details of this system but also learn the principles of beam control that have led to the particular design choices made

  19. Booster Vaccination: The Role of Reduced Antigen Content Vaccines as a Preschool Booster

    Directory of Open Access Journals (Sweden)

    Giovanni Gabutti

    2014-01-01

    Full Text Available The need for boosters for tetanus, diphtheria, pertussis, and polio, starting from preschool age, is related to the waning immune protection conferred by vaccination, the elimination/reduction of natural boosters due to large-scale immunization programs, and the possibility of reintroduction of wild agents from endemic areas. Taking into account the relevance of safety/tolerability in the compliance with vaccination among the population, it have been assessed whether today enough scientific evidences are available to support the use of dTap-IPV booster in preschool age. The review of the literature was conducted using the PubMed search engine. A total of 41 works has been selected; besides, the documentation produced by the World Health Organization, the European Centre for Disease Control, and the Italian Ministry of Health has been consulted. Many recent papers confirm the opportunity to use a low antigenic dose vaccine starting from 4 to 6 years of age. There is also evidence that 10 years after immunization the rate of seroprotected subjects against diphtheria does not differ significantly between those vaccinated with paediatric dose (DTaP or reduced dose (dTaP or dTap product. The dTpa vaccine is highly immunogenic for diphtheria toxoids regardless of prior vaccination history (2 + 1 and 3 + 1 schedules.

  20. Developing an area-wide system for coordinated ramp meter control.

    Science.gov (United States)

    2008-12-01

    Ramp metering has been broadly accepted and deployed as an effective countermeasure : against both recurrent and non-recurrent congestion on freeways. However, many current ramp : metering algorithms tend to improve only freeway travels using local d...

  1. 9 CFR 313.1 - Livestock pens, driveways and ramps.

    Science.gov (United States)

    2010-01-01

    ... protruding objects which may, in the opinion of the inspector, cause injury or pain to the animals. Loose... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Livestock pens, driveways and ramps. 313.1 Section 313.1 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF...

  2. On Reynolds number dependence of micro-ramp-induced transition

    NARCIS (Netherlands)

    Ye, Q.; Schrijer, F.F.J.; Scarano, F.

    2018-01-01

    The variation of transitional flow features past a micro-ramp is investigated when the Reynolds number is decreased approaching the critical regime. Experiments are conducted in the incompressible flow spanning from supercritical to subcritical roughness-height-based Reynolds number ( , 730, 460

  3. Ramp-up of CHI Initiated Plasmas on NSTX

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, D; Bell, R E; LeBlanc, B; Roquemore, A L; Raman, R; Jarboe, T R; Nelson, B A

    2009-10-29

    Experiments on the National Spherical Torus (NSTX) have now demonstrated flux savings using transient coaxial helicity injection (CHI). In these discharges, the discharges initiated by CHI are ramped up with an inductive transformer and exhibit higher plasma current than discharges without the benefit of CHI initiation.

  4. RAMP: a computer system for mapping regional areas

    Science.gov (United States)

    Bradley B. Nickey

    1975-01-01

    Until 1972, the U.S. Forest Service's Individual Fire Reports recorded locations by the section-township-range system..These earlier fire reports, therefore, lacked congruent locations. RAMP (Regional Area Mapping Procedure) was designed to make the reports more useful for quantitative analysis. This computer-based technique converts locations expressed in...

  5. The phase transition of RDX under hydrostatic and ramp compression

    Science.gov (United States)

    Zheng, Xianxu; Zhang, Zhaohui; Zhao, Jun; Zeng, Daipeng; Zeng, Yangyang; Zhang, Xu

    2017-06-01

    The thermodynamic state of explosive was highly dependent on the phase transition structure and phase transition of explosive crystal. However, the phase transition details of explosive have never been characterized sufficiently under different compression conditions. In this study, both the hydrostatic and ramp compression were performed to examine the phase transition of RDX crystal. Based on our experimental results, we confirmed the α- γ phase transition onset around 4 GPa under hydrostatic compression, which agree with the published literature very well. In the ramp compression experiment, a 260 ns ramp compression up to 30 GPa was generated to compress the RDX single crystal along 020 crystal axis, the PDV signal indicated that the phase transition was induced around 2.8 GPa, and the phase transition induction time was about several tens nanoseconds. Our preliminary experiments suggest that the phase transition pressure of RDX have great relation with the compression history, that probably means the phase transition mechanism were quite different between the hydrostatic and ramp compression.

  6. Enhanced transparency ramp-type Josephson contacts through interlayer deposition

    NARCIS (Netherlands)

    Smilde, H.J.H.; Hilgenkamp, Johannes W.M.; Rijnders, Augustinus J.H.M.; Rogalla, Horst; Blank, David H.A.

    2002-01-01

    A thin interlayer is incorporated in ramp-type Josephson junctions to obtain an increased transparency. The interlayer restores the surface damaged by ion milling and has the advantage of an all in situ barrier deposition between two superconductors, leading to clean and well-defined interfaces. The

  7. The Assessment of Ramp Metering Based on Fuzzy Logic

    NARCIS (Netherlands)

    Taale, H.; Slager, Jan; Rosloot, Jeroen

    1996-01-01

    This paper deals with an assessment project and its results of an experiment with ramp metering based on fuzzy logic. In industrial processes and home appliances the control method based on fuzzy logic is being used more and
    more. In traffic control however the use of this method is still in a

  8. Linear optics survey of the BESSY II booster synchrotron

    Energy Technology Data Exchange (ETDEWEB)

    Volz, Paul; Jankowiak, Andreas; Ries, Markus [Helmholtz-Zentrum Berlin, Berlin (Germany)

    2016-07-01

    The proposed VSR upgrade for the BESSY II storage ring features photon pulses as short as 1.7 ps. The current injection system (linac, booster synchrotron, and transfer line) cannot provide electron bunches short enough to meet the required injection efficiency for TopUp operation. This contribution investigates if the momentum compaction factor of the booster synchrotron can be decreased just by changing the quadrupole strengths in the existing booster synchrotron lattice. It was found that by splitting the two quadrupole families into four the momentum compaction factor can be reduced.

  9. Logic and control module for the Fermilab booster beam damper

    International Nuclear Information System (INIS)

    Sandberg, B.R.

    1977-01-01

    A logic and control module is included in the electronic system of the booster superdamper. This module produces a 9-bit digital word that controls the delay of beam bunch position information in the Fermilab booster synchrotron so that it arrives at the damping electrodes at the same time as the bunch of beam to be corrected. This delay word generator also has an output feature that only allows delay time decreases as the booster synchrotron frequency program increases monotonically. Such a feature guards against low-index incidental FM from affecting the delay computations

  10. Break up of bound-N-spatial-soliton in a ramp waveguide

    NARCIS (Netherlands)

    Suryanto, A.; van Groesen, Embrecht W.C.

    2002-01-01

    We present an analytical and numerical investigation of the propagation of spatial solitons in a nonlinear waveguide with ramp linear refractive index profile (ramp waveguide). For the propagation of a single soliton beam in a ramp waveguide, the particle theory shows that the soliton beam follows a

  11. Numerical model for thermoeconomic diagnosis in commercial transcritical/subcritical booster refrigeration systems

    International Nuclear Information System (INIS)

    Ommen, Torben; Elmegaard, Brian

    2012-01-01

    Highlights: ► A transcritical booster refrigeration plant is modelled. ► We examine changes in cost flow at different operation parameters. ► The use of characteristic curves for diagnosis is studied. - Abstract: Transcritical/subcritical booster refrigeration systems are increasingly installed and used in Danish supermarkets. The systems operate in both transcritical and subcritical conditions dependent on the heat rejection performance and the ambient conditions. The plant consists of one refrigerant cycle supplying refrigerant for evaporators in both chilled and frozen display cases. In the paper, thermoeconomic theory is used to establish the cost of cooling at each individual temperature level based on operating costs. With a high amount of operating systems, faulty operation becomes an economic, and environmental, interest. A general solution for evaluation of these systems is considered, with the objective to reduce cost and power consumption of malfunctioning equipment in operation. An analysis of the use of thermoeconomic diagnosis methods is required, as these methods may prove applicable. To accommodate the analysis, a numerical model of a transcritical booster refrigeration plant is considered in this paper. Additionally the characteristic curves method is applied to the high pressure compressor unit of the refrigeration plant. The approach successfully determine whether an anomaly is intrinsic or induced in the component when no uncertainties are introduced in the steady state model.

  12. Novel Low Cost Booster Propulsion Development and Demonstration, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed contract effort is for the design, development and proof-of-concept demontration testing of a low cost, pressure-fed liquid rocket booster propulsion...

  13. Object-oriented programming techniques for the AGS Booster

    International Nuclear Information System (INIS)

    Skelly, J.F.

    1991-01-01

    The applications software developed for the control system of the AGS Booster Project was written in the object-oriented language, C++. A the start of the Booster Project, the programming staff of the AGS Controls Section comprised some dozen programmer/analysts, all highly fluent in C but novices in C++. During the coarse of this project, nearly the entire staff converted to using C++ for a large fraction of their assignments. Over 100 C++ software modules are now available for Booster and general AGS use, of which a large fraction are broadly applicable tools. The transition from C to C++ from a managerial perspective is discussed and an overview is provided of the ways in which object classes have been applied in Booster software development

  14. Superconducting LINAC booster for the pelletron accelerator at Bombay

    International Nuclear Information System (INIS)

    Pillay, R.G.; Kurup, M.B.; Jain, A.K.; Biswas, D.; Kori, S.A.; Srinivasan, B.

    1989-01-01

    A superconducting heavy ion linear accelerator being constructed as a booster for the 14 UD pelletron installed recently at Bombay. The work involved in this project and the progress made so far are reviewed. (author). 15 refs., 8 figs

  15. SIMULATIONS OF BOOSTER INJECTION EFFICIENCY FOR THE APS-UPGRADE

    Energy Technology Data Exchange (ETDEWEB)

    Calvey, J.; Borland, M.; Harkay, K.; Lindberg, R.; Yao, C.-Y.

    2017-06-25

    The APS-Upgrade will require the injector chain to provide high single bunch charge for swap-out injection. One possible limiting factor to achieving this is an observed reduction of injection efficiency into the booster synchrotron at high charge. We have simulated booster injection using the particle tracking code elegant, including a model for the booster impedance and beam loading in the RF cavities. The simulations point to two possible causes for reduced efficiency: energy oscillations leading to losses at high dispersion locations, and a vertical beam size blowup caused by ions in the Particle Accumulator Ring. We also show that the efficiency is much higher in an alternate booster lattice with smaller vertical beta function and zero dispersion in the straight sections.

  16. YALINA-booster subcritical assembly pulsed-neutron experiments : data processing and spatial corrections.

    Energy Technology Data Exchange (ETDEWEB)

    Cao, Y.; Gohar, Y.; Nuclear Engineering Division

    2010-10-11

    The YALINA-Booster experiments and analyses are part of the collaboration between Argonne National Laboratory of USA and the Joint Institute for Power & Nuclear Research - SOSNY of Belarus for studying the physics of accelerator driven systems for nuclear energy applications using low enriched uranium. The YALINA-Booster subcritical assembly is utilized for studying the kinetics of accelerator driven systems with its highly intensive D-T or D-D pulsed neutron source. In particular, the pulsed neutron methods are used to determine the reactivity of the subcritical system. This report examines the pulsed-neutron experiments performed in the YALINA-Booster facility with different configurations for the subcritical assembly. The 1141 configuration with 90% U-235 fuel and the 1185 configuration with 36% or 21% U-235 fuel are examined. The Sjoestrand area-ratio method is utilized to determine the reactivities of the different configurations. The linear regression method is applied to obtain the prompt neutron decay constants from the pulsed-neutron experimental data. The reactivity values obtained from the experimental data are shown to be dependent on the detector locations inside the subcritical assembly and the types of detector used for the measurements. In this report, Bell's spatial correction factors are calculated based on a Monte Carlo model to remove the detector dependences. The large differences between the reactivity values given by the detectors in the fast neutron zone of the YALINA-Booster are reduced after applying the spatial corrections. In addition, the estimated reactivity values after the spatial corrections are much less spatially dependent.

  17. Glide back booster wind tunnel model testing

    Science.gov (United States)

    Pricop, M. V.; Cojocaru, M. G.; Stoica, C. I.; Niculescu, M. L.; Neculaescu, A. M.; Persinaru, A. G.; Boscoianu, M.

    2017-07-01

    Affordable space access requires partial or ideally full launch vehicle reuse, which is in line with clean environment requirement. Although the idea is old, the practical use is difficult, requiring very large technology investment for qualification. Rocket gliders like Space Shuttle have been successfullyoperated but the price and correspondingly the energy footprint were found not sustainable. For medium launchers, finally there is a very promising platform as Falcon 9. For very small launchers the situation is more complex, because the performance index (payload to start mass) is already small, versus medium and heavy launchers. For partial reusable micro launchers this index is even smaller. However the challenge has to be taken because it is likely that in a multiyear effort, technology is going to enable the performance recovery to make such a system economically and environmentally feasible. The current paper is devoted to a small unitary glide back booster which is foreseen to be assembled in a number of possible configurations. Although the level of analysis is not deep, the solution is analyzed from the aerodynamic point of view. A wind tunnel model is designed, with an active canard, to enablea more efficient wind tunnel campaign, as a national level premiere.

  18. CT Scan of NASA Booster Nozzle

    Energy Technology Data Exchange (ETDEWEB)

    Schneberk, D; Perry, R; Thompson, R

    2004-07-27

    We scanned a Booster Nozzle for NASA with our 9 meV LINAC, AmSi panel scanner. Three scans were performed using different filtering schemes and different positions of the nozzle. The results of the scan presented here are taken from the scan which provided the best contrast and lowest noise of the three. Our inspection data shows a number of indications of voids in the outer coating of rubber/carbon. The voids are mostly on the side of the nozzle, but a few small voids are present at the ends of the nozzle. We saw no large voids in the adhesive layer between the Aluminum and the inner layer of carbon. This 3D inspection data did show some variation in the size of the adhesive layer, but none of the indications were larger than 3 pixels in extent (21 mils). We have developed a variety of contour estimation and extraction techniques for inspecting small spaces between layers. These tools might work directly on un-sectioned nozzles since the circular contours will fit with our tools a little better. Consequently, it would be useful to scan a full nozzle to ensure there are no untoward degradations in data quality, and to see if our tools would work to extract the adhesive layer.

  19. FCC-ee Pre-Booster Accelerators

    CERN Document Server

    Ogur, S; Zimmermann, F

    2017-01-01

    CERN’s ambitious new project, Future Circular Collider-ee, will have four operations as Z, W, H, and tt factories covering energies from 45.6 to 175 GeV. The main challenge of Z-operation is to achieve currents as high as 1450 mA; this will depend heavily on the injector. For this reason, we conclude that we need a high bunch charge of 3.3 × 1010, for both e− and e+, and fill 91 500 of each of those bunches into the collider. To achieve the goal, we have designed an S-band (2.856 GHz) normal conducting electron linac up to 6 GeV, which we will use to create and accelerate both electrons and positrons. Positrons will be created inside the linac at 4.46 GeV, will be accelerated up to 1.54 GeV at the linac, and will then be transferred to the designed damping ring. In this paper, we present the designed linac, damping ring, and the operational requirements of the 100 km booster.

  20. Improvement of seawater booster pump outlet check valve

    International Nuclear Information System (INIS)

    Li Xuning; Du Yansong; Huang Huimin

    2010-01-01

    Conventional island seawater booster pump set of QNPC 310 MWe unit are very important in the whole circulating cooling system, and the integrate function of seawater booster pump outlet check valve is the foundation of steady operation of the seawater booster pump set. The article mainly introduce that through the analyses to the reason to the problem that the seawater booster pump outlet check valve of QNPC 310 MWe unit appeared in past years by our team, and considering the influence of operation condition and circumstance, the team improve the seawater booster pump outlet check valve from swing check valve to shuttle check valve which operate more appropriately in the system. By the test of continuous practice, we make further modification to the inner structure of shuttle check valve contrapuntally, and therefore we solve the problem in seawater booster pump outlet check valve fundamentally which has troubled the security of system operation in past years, so we realize the aim of technical improvement and ensure that the system operate in safety and stability. (authors)

  1. Prosthodontic management of mandibular deviation using palatal ramp appliance

    Directory of Open Access Journals (Sweden)

    Prince Kumar

    2012-08-01

    Full Text Available Segmental resection of the mandible generally results in deviation of the mandible to the defective side. This loss of continuity of the mandible destroys the balance of the lower face and leads to decreased mandibular function by deviation of the residual segment toward the surgical site. Prosthetic methods advocated to reduce or eliminate mandibular deviation include intermaxillary fixation, removable mandibular guide flange, palatal ramp, implant-supported prosthesis and palatal guidance restorations which may be useful in reducing mandibular deviation and improving masticatory performance and efficiency. These methods and restorations would be combined with a well organized mandibular exercise regimen. This clinical report describes the rehabilitation following segmental mandibulectomy using palatal ramp prosthesis.

  2. ALTERNATIVE MATERIALS FOR RAMP-EDGE SNS JUNCTIONS

    International Nuclear Information System (INIS)

    Jia, Q.; Fan, Y.; Gim, Y.

    1999-01-01

    We report on the processing optimization and fabrication of ramp-edge high-temperature superconducting junctions by using alternative materials for both superconductor electrodes and normal-metal barrier. By using Ag-doped YBa 2 Cu 3 O 7-x (Ag:YBCO) as electrodes and a cation-modified compound of (Pr y Gd 0.6-y )Ca 0.4 Ba 1.6 La 0.4 Cu 3 O 7 (y = 0.4, 0.5, and 0.6) as a normal-metal barrier, high-temperature superconducting Josephson junctions have been fabricated in a ramp-edge superconductor/normal-metal/superconductor (SNS) configuration. By using Ag:YBCO as electrodes, we have found that the processing controllability /reproducibility and the stability of the SNS junctions are improved substantially. The junctions fabricated with these alternative materials show well-defined RSJ-like current vs voltage characteristics at liquid nitrogen temperature

  3. Engineering task plan for steam line ramp calculations

    International Nuclear Information System (INIS)

    DeSantis, G.N.; Freeman, R.D.

    1994-01-01

    The purpose of this document is to provide an approved work plan to perform calculations that verify the load limits of a proposed ramp over a steam line at the back side (East side) of SY Farm in support of work package 2W-94-00812/K. The objective of this supporting document is to provide Operations with a set of checked calculations that verify the ramp over the steam line at SY Farm will support a fully loaded concrete mixer truck without affecting the steam line. The calculations will be performed by an engineers from Facility Systems and independently checked and reviewed by another engineer. The calculations may then be added to the work package. If Operations decides to make any configuration changes to the steam line or surrounding area, Operations shall have these changes documented by an Engineering Change Notice (ECN). This ECN can be done by Facility Systems or any other engineering organization at the direction of Operations

  4. T-Craft Seabase Ramp Loads Model Test Data Report

    Science.gov (United States)

    2010-12-01

    connections and relative motions of the seabase. 15. SUBJECT TERMS Seabase, Seakeeping, LMSR, T-Craft, Ramp Loads 16. SECURITY CLASSIFICATION OF: a. REPORT...Acceleration 39 Applied Geomechanics Pro 3600 and Tilt Table 39 Acceleration Calibration by Inclination 39 Local Acceleration of Gravity 41...limit will be larger than the calibration uncertainty, especially when surface waves are involved. Acceleration Applied Geomechanics Pro 3600 and Tilt

  5. Ramp and periodic dynamics across non-Ising critical points

    Science.gov (United States)

    Ghosh, Roopayan; Sen, Arnab; Sengupta, K.

    2018-01-01

    We study ramp and periodic dynamics of ultracold bosons in an one-dimensional (1D) optical lattice which supports quantum critical points separating a uniform and a Z3 or Z4 symmetry broken density-wave ground state. Our protocol involves both linear and periodic drives which takes the system from the uniform state to the quantum critical point (for linear drive protocol) or to the ordered state and back (for periodic drive protocols) via controlled variation of a parameter of the system Hamiltonian. We provide exact numerical computation, for finite-size boson chains with L ≤24 using exact diagonalization (ED), of the excitation density D , the wave function overlap F , and the excess energy Q at the end of the drive protocol. For the linear ramp protocol, we identify the range of ramp speeds for which D and Q show Kibble-Zurek scaling. We find, based on numerical analysis with L ≤24 , that such scaling is consistent with that expected from critical exponents of the q -state Potts universality class with q =3 ,4 . For the periodic protocol, we show that the model displays near-perfect dynamical freezing at specific frequencies; at these frequencies D ,Q →0 and |F |→1 . We provide a semi-analytic explanation of such freezing behavior and relate this phenomenon to a many-body version of Stuckelberg interference. We suggest experiments which can test our theory.

  6. Radiance Measurement on Shock-Ramp Loaded Tin

    Science.gov (United States)

    Nguyen, Jeffrey; Akin, Minta; Asimow, Paul; Holmes, Neil

    2017-06-01

    An accurate material temperature is not only an essential component of an equation of state, but also a good measure of a phase transition, its kinetics, and associated thermal transport properties. In a series of experiments, we measured particle velocity and thermal emission at the tin-LiF interfaces on shock and ramp loading experiments. Using a graded density impactor, we drive the tin sample through melting with the initial shock and then further ramp-compress it back into the solid phase. Various configurations of experimental set-up were used to simultaneously measure particle velocity and thermal emission from which we deduce pressure, density, sound velocity and temperature. A gray body radiation is assumed in these calculations. We present here more recent results and updated analysis of shock-and-ramp-loaded tin experiments. The measured particle velocity shows a traditional signature for phase transition, while thermal radiance exhibits a change consistent with the heat of solidification. We will discuss here the mechanical and thermal aspects of this phase transition, its kinetics, and thermal transport issues in this experiment. This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344.

  7. Hybrid boosters for future launch vehicles

    Science.gov (United States)

    Dargies, E.; Lo, R. E.

    There is a striking similarity in the design of the US Space Transportation System, the European ARI-ANE 5P and the Japanese II-II: they all use a high energy cryogenic core stage along with two large solid propellant rocket boosters (SRB's) in order to provide for a high lift-off thrust level. Prior to last years disasters with Challenger and Titan it was widely held that SRB's were cheap, uncomplicated and safe. Even before the revelation by these accidents of severe safety hazards, shuttle operations demonstrated that the SRB's were by no means as cheap as reusable systems ought to be. In addition, they became known as sources of considerable environmental pollution. In contrast, hybrid rocket propulsion systems offer the following potential advantages: • much higher savety level (TNT equivalent almost zero, shut-down capability in case of ignition failure of one unit, inert against unbonding) • choice of non-toxic propellant combinations • equal or higher specific performance For these reasons, system analysis were carried out to examine hybrids as potential alternative to SRB's. Various analytical tools (mass- and performance models, trajectory simulation etc.) were developed for parametrical studies of hybrid propulsion systems. Special attention was devoted to the well-known primary concern of hybrids: geometrical design of the solid fuel grain and regression rate of the ablating surface. Experimental data were used as input wherever possible. In 1985 first studies were carried out to find possible fields of application for hybrid rocket engines. A mass model and a performance model for hybrid rocket motors were developed, taking into account the peculiarities of hybrid combustion as there are i.e. low regression rate and shifting mixture ratio during operation. After some analytical work was done, hybrids proved to be a promising alternative to SRB's. Compared with solids, hybrids offer many advantages.

  8. Lactate minimum in a ramp protocol and its validity to estimate the maximal lactate steady state

    Directory of Open Access Journals (Sweden)

    Emerson Pardono

    2009-01-01

    Full Text Available http://dx.doi.org/10.5007/1980-0037.2009v11n2p174   The objectives of this study were to evaluate the validity of the lactate minimum (LM using a ramp protocol for the determination of LM intensity (LMI, and to estimate the exercise intensity corresponding to maximal blood lactate steady state (MLSS. In addition, the possibility of determining aerobic and anaerobic fitness was investigated. Fourteen male cyclists of regional level performed one LM protocol on a cycle ergometer (Excalibur–Lode consisting of an incremental test at an initial workload of 75 Watts, with increments of 1 Watt every 6 seconds. Hyperlactatemia was induced by a 30-second Wingate anaerobic test (WAT (Monark–834E at a workload corresponding to 8.57% of the volunteer’s body weight. Peak power (11.5±2 Watts/kg, mean power output (9.8±1.7 Watts/kg, fatigue index (33.7±2.3% and lactate 7 min after WAT (10.5±2.3 mmol/L were determined. The incremental test identified LMI (207.8±17.7 Watts and its respective blood lactate concentration (2.9±0.7 mmol/L, heart rate (153.6±10.6 bpm, and also maximal aerobic power (305.2±31.0 Watts. MLSS intensity was identified by 2 to 4 constant exercise tests (207.8±17.7 Watts, with no difference compared to LMI and good agreement between the two parameters. The LM test using a ramp protocol seems to be a valid method for the identification of LMI and estimation of MLSS intensity in regional cyclists. In addition, both anaerobic and aerobic fitness parameters were identified during a single session.

  9. Performance of ultra low temperature district heating systems with utility plant and booster heat pumps

    DEFF Research Database (Denmark)

    Ommen, Torben Schmidt; Thorsen, Jan Eric; Markussen, Wiebke Brix

    2017-01-01

    The optimal integration of booster heat pumps in ultra low temperature district heating (ULTDH) was investigated and compared to the performance of low temperature district heating. Two possible heat production technologies for the DH networks were analysed, namely extraction combined heat...... and power (CHP) and central heat pumps (HPs). The analysis focussed on the characteristic heat demands of newly build multi-story buildings and the results were based on the ratio of the individual demands compared to the total. It was found that the optimal return temperature was dependent on the forward...

  10. LS1 Report: first beams in the Booster

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Monday, 2 June, the Operations Group injected the first beams into the PS Booster (PSB). The PSB, the second machine in the LHC injector chain to be recommissioned (Linac2 was the first), also provides beams for non-LHC experiments, some of which will need beams for physics as early as this summer.   The PS Booster. The Operations Group has been back in control of the PS Booster for a month now, having taken over where the engineers and experts of the EN Department, who were responsible for the maintenance work, left off. The group first ran tests with no beam (known as “cold check-out”) to check and requalify all the machine instrumentation, from the control room to the ring itself. Now in beam mode, the Booster is being prepared both to begin supplying the PS at the end of June and, above all, for physics to restart in the ISOLDE experimental area. The PS Booster console in the CERN Control Centre. “We have around 15 types of beams to ‘prepa...

  11. Selection for optimal exit ramp type on Florida’s freeways based on operational analysis

    Directory of Open Access Journals (Sweden)

    Chen Wang

    2016-01-01

    Full Text Available In the State of Florida, several types of exit ramps are used, including single-lane exit ramp with a taper, single-lane exit ramp without a taper, two-lane exit ramp with an optional lane, and two-lane exit ramp without an optional lane. Drivers exiting freeways need to make maneuver decisions (lane change, lane merge, and decelerate prior to exit ramps in order to access cross roads at interchanges. Different exit ramp types lead to varying driving maneuvers when exiting, affecting the operational and safety performance on freeways. Based on the facts, there are several issues that need to be addressed in selecting the most optimum types of freeway exit ramps. This article mainly focuses on the comparison of operational performances of different ramp types and tries to present a method for choosing the optimal one. A data collection of 24 sites in Florida were conducted, and traffic simulations by Traffic Software Integrated System: Corridor Simulation were employed. Mathematical models were built to evaluate impacts of these ramps based on simulations. And an analytical hierarchy process method was applied to assign significance weight for all selected measures of effectiveness in terms of Florida questionnaire. Finally, an aggregate numerical evaluation was provided according to calculated data.

  12. Variability in large-scale wind power generation

    DEFF Research Database (Denmark)

    Kiviluoma, Juha; Holttinen, Hannele; Weir, David

    2016-01-01

    The paper demonstrates the characteristics of wind power variability and net load variability in multiple power systems based on real data from multiple years. Demonstrated characteristics include probability distribution for different ramp durations, seasonal and diurnal variability and low net ...

  13. Thermal instability observations during ramp tests in the Studsvik R2 reactor

    International Nuclear Information System (INIS)

    Roennberg, G.; Kjaer-Pedersen, N.

    1984-01-01

    A series of ramp tests on ENC-built BWR fuel from the Big Rock Point reactor was performed in September 1982 in the Studsvik R2 Reactor. The tests involved segmented rods with a burnup of 18 MWd/KgU, and constituted part of the Fuel Performance Improvement Program sponsored by the United States Department of Energy. Rods of different designs were tested. The reference design had solid, dished pellets and was unpressurized. The alternative designs were annular pellets and sphere-pac. Some of the rods with annular pellets were prepressurized, and some were not. During the ramp tests the rod power is controlled by a helium depressurization loop which causes a strictly linear power ramp versus time. The thermal output of the test rig is measured calorimetrically, the data immediately being recorded on a strip chart and later processed by a computer. Furthermore, elongation detectors permit the immediate recording of the rod length variation versus time. For some of the rods the thermal output went constant for a fraction of a minute after reaching a certain value, then continued to rise, while the helium depressurization continued to proceed linearly with time. For the duration of this plateau of the thermal output curve the slope of the elongation detector signal was significantly higher than before, but fell back to its original value after the plateau. This observation was made only for the reference rods. None of the annular rods, with or without prepressurization, nor the sphere-pac rods, showed the effect. When observed, the effect occurred at about 40 kw/m. The effect is attributed to fission gas release rapidly being enhanced by thermal feedback. The increase in stored energy associated with the temperature rise in the fuel causes the delay in thermal output. The larger available internal volume and/or the prepressurization of the annular rods, and the lack of a distinct fuel-clad gap for the sphere-pac rods prevented the effect from occurring in those other

  14. Applied Distributed Model Predictive Control for Energy Efficient Buildings and Ramp Metering

    Science.gov (United States)

    Koehler, Sarah Muraoka

    Industrial large-scale control problems present an interesting algorithmic design challenge. A number of controllers must cooperate in real-time on a network of embedded hardware with limited computing power in order to maximize system efficiency while respecting constraints and despite communication delays. Model predictive control (MPC) can automatically synthesize a centralized controller which optimizes an objective function subject to a system model, constraints, and predictions of disturbance. Unfortunately, the computations required by model predictive controllers for large-scale systems often limit its industrial implementation only to medium-scale slow processes. Distributed model predictive control (DMPC) enters the picture as a way to decentralize a large-scale model predictive control problem. The main idea of DMPC is to split the computations required by the MPC problem amongst distributed processors that can compute in parallel and communicate iteratively to find a solution. Some popularly proposed solutions are distributed optimization algorithms such as dual decomposition and the alternating direction method of multipliers (ADMM). However, these algorithms ignore two practical challenges: substantial communication delays present in control systems and also problem non-convexity. This thesis presents two novel and practically effective DMPC algorithms. The first DMPC algorithm is based on a primal-dual active-set method which achieves fast convergence, making it suitable for large-scale control applications which have a large communication delay across its communication network. In particular, this algorithm is suited for MPC problems with a quadratic cost, linear dynamics, forecasted demand, and box constraints. We measure the performance of this algorithm and show that it significantly outperforms both dual decomposition and ADMM in the presence of communication delay. The second DMPC algorithm is based on an inexact interior point method which is

  15. The Influence of Frontal and Lateral Ramps in Fold Thrust Belts on Structural Architecture and Erosion

    Science.gov (United States)

    Robinson, D. M.; McQuarrie, N.

    2016-12-01

    In fold thrust belts, horizontal and vertical motions (or flow) define the path that a particular rock or mineral takes to the surface of the Earth, which is dictated by the location of frontal and lateral ramps. Horizontal flow occurs between ramp locations while the vertical component of motion (or flow) dominates when rocks are traveling over the ramps. Frontal ramps are common features near the front (foreland) of a fold thrust belt. Foreland frontal ramps are the easiest to obtain data for, and from these data predict ramp geometry, because they are shallow and the ramp geometry is commonly expressed as changes in the dip of strata in the mapped geology. Less constrainable are the frontal ramps at depth in the hinterland of a fold thrust belt. However, these deep frontal ramps control the architecture of a fold thrust belt, influence the mapped surface geology, control active uplift and thus, are locations of focused erosion. We show kinematic models from Nepal that illustrate how the architecture (geometry of structures, dips of strata) changes in the fold thrust belt when the location of a frontal ramp is moved and how both thermochronologic data and accurate mapping limit the possibilities for the location of these hinterland frontal ramps. Lateral ramps at depth provide limits on the width of horizontal flow paths and encourage vertical flow paths that have orientations strongly oblique to the strike of the orogen. A challenge in fold thrust belts is to determine the most logical location for lateral ramps. We use examples from Nepal that highlight characteristics that can be used to define the location of lateral ramps. Both lateral and frontal ramps produce significant structural elevation and changes in topographic elevation and thus, are locations of focused erosion through time. Additionally, because material is moving both laterally and vertically in a brittle fold thrust belt, frontal and lateral ramps can control the origin of earthquakes as well

  16. Assessment of peak oxygen uptake during handcycling: Test-retest reliability and comparison of a ramp-incremented and perceptually-regulated exercise test.

    Directory of Open Access Journals (Sweden)

    Michael J Hutchinson

    Full Text Available To examine the reliability of a perceptually-regulated maximal exercise test (PRETmax to measure peak oxygen uptake ([Formula: see text] during handcycle exercise and to compare peak responses to those derived from a ramp-incremented protocol (RAMP.Twenty recreationally active individuals (14 male, 6 female completed four trials across a 2-week period, using a randomised, counterbalanced design. Participants completed two RAMP protocols (20 W·min-1 in week 1, followed by two PRETmax in week 2, or vice versa. The PRETmax comprised five, 2-min stages clamped at Ratings of Perceived Exertion (RPE 11, 13, 15, 17 and 20. Participants changed power output (PO as often as required to maintain target RPE. Gas exchange variables (oxygen uptake, carbon dioxide production, minute ventilation, heart rate (HR and PO were collected throughout. Differentiated RPE were collected at the end of each stage throughout trials.For relative [Formula: see text], coefficient of variation (CV was equal to 4.1% and 4.8%, with ICC(3,1 of 0.92 and 0.85 for repeated measures from PRETmax and RAMP, respectively. Measurement error was 0.15 L·min-1 and 2.11 ml·kg-1·min-1 in PRETmax and 0.16 L·min-1 and 2.29 ml·kg-1·min-1 during RAMP for determining absolute and relative [Formula: see text], respectively. The difference in [Formula: see text] between PRETmax and RAMP was tending towards statistical significance (26.2 ± 5.1 versus 24.3 ± 4.0 ml·kg-1·min-1, P = 0.055. The 95% LoA were -1.9 ± 4.1 (-9.9 to 6.2 ml·kg-1·min-1.The PRETmax can be used as a reliable test to measure [Formula: see text] during handcycle exercise in recreationally active participants. Whilst PRETmax tended towards significantly greater [Formula: see text] values than RAMP, the difference is smaller than measurement error of determining [Formula: see text] from PRETmax and RAMP.

  17. Assessment of peak oxygen uptake during handcycling: Test-retest reliability and comparison of a ramp-incremented and perceptually-regulated exercise test.

    Science.gov (United States)

    Hutchinson, Michael J; Paulson, Thomas A W; Eston, Roger; Goosey-Tolfrey, Victoria L

    2017-01-01

    To examine the reliability of a perceptually-regulated maximal exercise test (PRETmax) to measure peak oxygen uptake ([Formula: see text]) during handcycle exercise and to compare peak responses to those derived from a ramp-incremented protocol (RAMP). Twenty recreationally active individuals (14 male, 6 female) completed four trials across a 2-week period, using a randomised, counterbalanced design. Participants completed two RAMP protocols (20 W·min-1) in week 1, followed by two PRETmax in week 2, or vice versa. The PRETmax comprised five, 2-min stages clamped at Ratings of Perceived Exertion (RPE) 11, 13, 15, 17 and 20. Participants changed power output (PO) as often as required to maintain target RPE. Gas exchange variables (oxygen uptake, carbon dioxide production, minute ventilation), heart rate (HR) and PO were collected throughout. Differentiated RPE were collected at the end of each stage throughout trials. For relative [Formula: see text], coefficient of variation (CV) was equal to 4.1% and 4.8%, with ICC(3,1) of 0.92 and 0.85 for repeated measures from PRETmax and RAMP, respectively. Measurement error was 0.15 L·min-1 and 2.11 ml·kg-1·min-1 in PRETmax and 0.16 L·min-1 and 2.29 ml·kg-1·min-1 during RAMP for determining absolute and relative [Formula: see text], respectively. The difference in [Formula: see text] between PRETmax and RAMP was tending towards statistical significance (26.2 ± 5.1 versus 24.3 ± 4.0 ml·kg-1·min-1, P = 0.055). The 95% LoA were -1.9 ± 4.1 (-9.9 to 6.2) ml·kg-1·min-1. The PRETmax can be used as a reliable test to measure [Formula: see text] during handcycle exercise in recreationally active participants. Whilst PRETmax tended towards significantly greater [Formula: see text] values than RAMP, the difference is smaller than measurement error of determining [Formula: see text] from PRETmax and RAMP.

  18. Effects of ramp reset pulses on the address discharge in a shadow mask plasma display panel

    International Nuclear Information System (INIS)

    Yang Lanlan; Tu Yan; Zhang Xiong; Jiang Youyan; Zhang Jian; Wang Baoping

    2007-01-01

    A two-dimensional self-consistent numerical simulation model is used to analyse the effects of the ramp reset pulses on the address discharge in a shadow mask plasma display panel (SM-PDP). Some basic parameters such as the slope of the ramp pulse and the terminal voltage of the ramp reset period are varied to investigate their effects. The simulation results illustrate that the wall voltage is mainly decided by the terminal voltage and the firing voltage at the end of the ramp reset period. Moreover, the variation of the ramp slope will also bring a few modifications to the wall voltage. The priming particles in the beginning of the addressing period are related to the slope of the ramping down voltage pulse. The simulation results can help us optimize the driving scheme of the SM-PDP

  19. Optics Corrections with LOCO in the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Tan, Cheng-Yang [Fermilab; Prost, Lionel [Fermilab; Seiya, Kiyomi [Fermilab; Triplett, A. Kent [Fermilab

    2016-06-01

    The optics of the Fermilab Booster has been corrected with LOCO (Linear Optics from Closed Orbits). However, the first corrections did not show any improvement in capture efficiency at injection. A detailed analysis of the results showed that the problem lay in the MADX optics file. Both the quadrupole and chromatic strengths were originally set as constants independent of beam energy. However, careful comparison between the measured and calculated tunes and chromatcity show that these strengths are energy dependent. After the MADX model was modified with these new energy dependent strengths, the LOCO corrected lattice has been applied to Booster. The effect of the corrected lattice will be discussed here.

  20. Design study of CEPC Alternating Magnetic Field Booster

    CERN Document Server

    Bian, T; Cai, Y; Cui, X; Gao, J; Koratzinos, M; Su, F; Wang, D; Wang, Y; Xiao, M; Zhang, C

    2017-01-01

    The CEPC is a next generation circular e+e- collider proposed by China. The design of the full energy booster ring of the CEPC is especially challenging. The ejected beam energy is 120 GeV, but that of the injected beam is only 6 GeV. In a conventional approach, the low magnetic field of the main dipole magnets creates problems. We propose operating the booster ring as a large wiggler at low beam energies and as a normal ring at high energies to avoid the problem of very low dipole magnet fields.

  1. Injection and transfer lines of the PS Booster

    CERN Multimedia

    Photographic Service

    1972-01-01

    In the foreground is the vacuum chamber for the 50 MeV proton beam coming from the Linac. The tank held by white frames houses the "Vertical Distributor", which deflects the Linac beam to the levels of the Booster's 4 superposed rings. After acceleration in the Booster, originally to 800 MeV, today to 1.4 GeV, the beams from the 4 rings are combined in the vertical plane and transfered to the 26 GeV PS. The "Recombination Line", intersecting the injection line, crosses the picture from left to right.

  2. Design of the AGS Booster Beam Position Monitor electronics

    International Nuclear Information System (INIS)

    Ciardullo, D.J.; Smith, G.A.; Beadle, E.R.

    1991-01-01

    The operational requirements of the AGS Booster Beam Position Monitor system necessitate the use of electronics with wide dynamic range and broad instantaneous bandwidth. Bunch synchronization is provided by a remote timing sequencer coupled to the local ring electronics via digital fiber-optic links. The Sequencer and local ring circuitry work together to provide single turn trajectory or average orbit and intensity information, integrated over 1 to 225 bunches. Test capabilities are built in for the purpose of enhancing BPM system accuracy. This paper describes the design of the Booster Beam Position Monitor electronics, and presents performance details of the front end processing, acquisition and timing circuitry

  3. Analysis of resonance-driving imperfections in the AGS Booster

    International Nuclear Information System (INIS)

    Gardner, C.; Shoji, Y.; Danby, G.; Glenn, J.W.; Jackson, G.J.; Soukas, A.; van Asselt, W.; Whalen, C.

    1994-01-01

    At the design intensity of 1.5 x 10 13 ppp, the space charge tune shift in the AGS Booster at injection has been estimated to be about 0.35. The beam tunes are therefore spread over many lower order resonance lines and the associated stopbands must be corrected in order to minimize the amplitude growth due to resonance excitation. This requires proper compensation of the resonance-driving harmonics which result from random magnetic field errors. The observation and correction of second and third order resonance stopbands in the AGS Booster is reviewed, and an analysis of magnetic field imperfections based on the required corrections is given

  4. Observation and correction of resonance stopbands in the AGS Booster

    International Nuclear Information System (INIS)

    Gardner, C.; Shoji, Y.; Ahrens, L.; Glenn, J.W.; Lee, Y.Y.; Roser, T.; Soukas, A.; van Asselt, W.; Weng, W.T.

    1993-01-01

    At the design intensity of 1.5 x 10 13 ppp, the space charge tune shift in the AGS Booster at injection has been estimated to be about 0.35. Therefore, the beam is spread over may lower order resonance lines and the stopbands have to be corrected to minimize the amplitude growth by proper compensation of the driving harmonics resulting from random errors. The observation and correction of second and third order resonance stopbands in the AGS Booster, and the establishment of a favorable operating point at high intensity are discussed

  5. Hemodynamic Ramp Tests in Patients With Left Ventricular Assist Devices.

    Science.gov (United States)

    Uriel, Nir; Sayer, Gabriel; Addetia, Karima; Fedson, Savitri; Kim, Gene H; Rodgers, Daniel; Kruse, Eric; Collins, Keith; Adatya, Sirtaz; Sarswat, Nitasha; Jorde, Ulrich P; Juricek, Colleen; Ota, Takeyoshi; Jeevanandam, Valluvan; Burkhoff, Daniel; Lang, Roberto M

    2016-03-01

    This study tested whether combined invasive hemodynamic and echocardiographic ramp tests can help optimize patient management. Guidelines for optimizing speed and medications in continuous flow ventricular assist device (cfLVAD) patients are mainly based on expert opinion. Thirty-five cfLVAD patients (21 HeartMate II [Thoratec, Pleasanton, California] and 14 HVAD [HeartWare International, Framingham, Massachusetts]) underwent ramp tests with right heart catheterization (including central venous pressure [CVP], pulmonary artery pressure, pulmonary capillary wedge pressure [PCWP], and blood pressure) and echocardiography. Data were recorded at up to 9 speed settings. Speed changes were in steps of 400 revolutions per minute (RPM) for HeartMate II (8,000 to 12,000 RPM) and 100 RPM for HVAD (2,300 to 3,200 RPM) patients. Only 42.9% of patients had normal CVPs and PCWPs at their original RPM settings. Going from lowest to highest speeds, cardiac output improved by 0.16 ± 0.19 l/min/step (total change 1.28 ± 1.41 l/min) and PCWP decreased by 1.23 ± 0.85 mm Hg/step (total change 9.9 ± 6.5 mm Hg). CVP and systolic blood pressure did not change significantly with RPM. RPM were adjusted based on test results to achieve CVPs and PCWPs as close to normal limits as possible, which was feasible in 56% of patients. For the remainder, results indicated which type of medical management should be pursued. Use of combined hemodynamic and echocardiographic ramp tests in patients provides objective means of optimizing RPM, and has the potential to guide medical management. It remains to be tested whether this strategy has a beneficial impact on quality of life or clinical outcomes. Copyright © 2016 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  6. Dynamic Ramping Model Including Intraperiod Ramp-Rate Changes in Unit Commitment

    NARCIS (Netherlands)

    Correa-Posada, Carlos M.; Morales Espana, G.; Martinez, P. Dueñas; Sánchez-Martín, Pedro

    2017-01-01

    The growing increase of renewable generation worldwide is posing new challenges for a secure, reliable and economic operation of power systems. In order to face the uncertain and intermittent production of renewable sources, operating reserves must be allocated efficiently and accurately. Nowadays,

  7. Booster seat law enforcement : examples from Delaware, New Jersey, Pennsylvania, and Washington.

    Science.gov (United States)

    2010-02-01

    The objective of this study was to evaluate the implementation of State booster seat laws : (enhanced child restraint laws) and examine the most effective strategies that law enforcement agencies can : use to enforce booster seat laws. The research i...

  8. Distribution of CGRP and its receptor components CLR and RAMP1 in the rat retina

    DEFF Research Database (Denmark)

    Blixt, Frank W; Radziwon-Balicka, Aneta; Edvinsson, Lars

    2017-01-01

    (RAMP1). While there is a growing recognition that CGRP plays a key role in migraine, the function of CGRP in the retina has not been fully established. This study aims to investigate the distribution of CGRP and its two receptor components in the rat retina, visually by immunohistochemistry...... and quantitatively using flow cytometry. CGRP immunoreactivity was found in the Müller cells while CLR/RAMP1 was located in the nerve fiber layer. Furthermore, since almost all RAMP1 immunoreactive cells co-express CLR, we propose that RAMP1 expression in the retina reflects functional CGRP receptors....

  9. Predictive factors for anti-HBs status after 1 booster dose of hepatitis B vaccine.

    Science.gov (United States)

    Lu, I-Cheng; Jean, Mei-Chu Yen; Lin, Chi-Wei; Chen, Wei-Hung; Perng, Daw-Shyong; Lin, Chih-Wen; Chuang, Hung-Yi

    2016-09-01

    In Taiwan, infants need to receive 3 doses of hepatitis B virus (HBV) vaccine under the public health policy from the government. However, there are many young adults who even though received complete HBV vaccination in their childhood would lose the positive response of anti-hepatitis B surface antibody (HBs) and need the booster dose of HBV vaccine. The aim of our study is to determine the powerful predictive factor for screening the candidates who need only 1 booster dose of HB vaccine then they can regain positive postbooster anti-HBs status (≧10 mIU/mL) or protective postbooster anti-HBs status (≧100 mIU/mL).We recruited 103 university freshmen who were born after July 1986 with complete HBV vaccination in childhood, but displayed negative results for hepatitis B surface antigen and anti-HBs levels at their health examinations upon university entry. They received 1 booster dose of HB vaccine, and their anti-HBs titers were rechecked 4 weeks after the booster administration. Multivariate analysis logistic regression for positive postbooster anti-HBs status (≧10 mIU/mL, model 1) and protective postbooster anti-HBs status (≧100 mIU/mL, model 2) was done with predictive factors of prebooster anti-HBs level, body mass index, serum glutamate pyruvate transaminase level, and sex.Twenty-four students got positive postbooster anti-HBs status (10-100 mIU/mL) and 50 students got protective postbooster anti-HBs status (≧100 mIU/mL). In the model of multivariate analysis logistic regression for positive postbooster anti-HBs status (≧10 mIU/mL), prebooster anti-HBs level was the strongest predictive factor. The odds ratio was 218.645 and the P value was 0.001. Even in the model of multivariate analysis logistic regression for protective postbooster anti-HBs status (≧100 mIU/mL), prebooster anti-HBs level was still the strongest predictive factor, but the odds ratio of a protective booster effect was 2.143, with 95% confidence interval between 1

  10. Main results of the complex adjustment and physical start-up of the fast-cyclic 1.5 GeV protn synchrotron being the IHEP booster

    International Nuclear Information System (INIS)

    Aleev, E.A.; Bruk, V.L.; Glukhikh, L.A.

    1985-01-01

    The data obtained in the course of adjustment and commisioning of the booster synchrotron are given, the construction of which has lead to the complition of the new injection system for Serpukhov synchrotron. Structural features of the main booster systems are considered, particularly, ring electromagnet consisting of 12 periods; beam injection system (one-and multiturn modes); magnetic field correction system; accelerating system comprising 9 RF stations; power supplies beam extraction system; channel for beam transport and injection into main accelerator; control system; beam monitors. The booster adjastment has been performed under different operation modes. Maximum energy constituted 1.3-1.5 GeV. Maximum beam intensity at one-turn injection 2.5x10 11 protons per a pulse. Injection energy increase from 100 MeV to 1.5 GeV permits obtaining intensity in the main synchrotron ringup to 5x10 13 protons per cycle, which exceeds by an order the attained level

  11. Tailored ramp wave generation in gas gun experiments

    Directory of Open Access Journals (Sweden)

    Cotton Matthew

    2015-01-01

    Full Text Available Gas guns are traditionally used as platforms to introduce a planar shock wave to a material using plate impact methods, generating states on the Hugoniot. The ability to deliver a ramp wave to a target during a gas gun experiment enables access to different regions of the equation-of-state surface, making it a valuable technique for characterising material behaviour. Previous techniques have relied on the use of multi-material impactors to generate a density gradient, which can be complex to manufacture. In this paper we describe the use of an additively manufactured steel component consisting of an array of tapered spikes which can deliver a ramp wave over ∼ 2 μs. The ability to tailor the input wave by varying the component design is discussed, an approach which makes use of the design freedom offered by additive manufacturing techniques to rapidly iterate the spike profile. Results from gas gun experiments are presented to evaluate the technique, and compared with 3D hydrodynamic simulations.

  12. A study of supersonic mixing flow field with ramp injector

    Science.gov (United States)

    Yamane, Yoshiyuki; Sawaguchi, Seiichi; Ando, Yasunori; Aso, Shigeru; Fukuda, Masahiro

    1994-06-01

    The purposes of the present paper are to investigate the structure of supersonic mixing flow field in ram/scramjet combustor and to develop the CFD code which will be used for the design of the combustor. One type of parallel injection method with ramp injector has been studied numerically and experimentally. The patterns of shock waves obtained by numerical simulations agreed with experimental results in schlieren photograph. Comparisons of static pressure distributions on the wall surface showed good agreement qualitatively. Numerical results captured the structures of flow field clearly, which were generating process of a pair of streamwise vortices and vortical roll-up of the jet. Oblique shocks made injectant gas lift off from wall surface, as found in calculations and experiments. According to these results, it could be said that the CFD code used in this study was useful for investigation of fuel-air mixing in supersonic flow field with parallel injection. From the numerical results, it was confirmed that the streamwise vortices generated by ramp injector and interaction between mixing field and oblique shocks were key factors for enhancement of fuel-air mixing in ram/scramjet combustor.

  13. OPTIMAL SCHEDULING OF BOOSTER DISINFECTION IN WATER DISTRIBUTION SYSTEMS

    Science.gov (United States)

    Booster disinfection is the addition of disinfectant at locations distributed throughout a water distribution system. Such a strategy can reduce the mass of disinfectant required to maintain a detectable residual at points of consumption in the distribution system, which may lea...

  14. Booster HBV vaccination; is it really necessary? | Alavian | Egyptian ...

    African Journals Online (AJOL)

    Egyptian Journal of Pediatric Allergy and Immunology (The). Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 9, No 2 (2011) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Booster HBV vaccination; is it ...

  15. FNAL Booster intensity, extraction, and synchronization control for collider operation

    International Nuclear Information System (INIS)

    Ducar, R.J.; Lackey, J.R.; Tawzer, S.R.

    1987-03-01

    Booster operation for collider physics is considerably different than for fixed target operation. Various scenarios for collider physics, machine studies, and P-Bar targeting may require that the intensity vary from 5E10 PPP to 3E12 PPP at a 15 Hertz machine cycle rate. In addition to the normal Booster single turn extraction mode, collider operations require that the Booster inject into the Main Ring a small number of beam bunches for coalescing into a single high intensity bunch. These bunches must be synchronized such that the center bunch arrives in the RF bucket which corresponds to the zero phase of the coalescing cavity. The system implemented has the ability to deliver a precise fraction of the available 84 Booster beam bunches to Main Ring or to the P-Bar Debuncher via the newly installed AP-4 beam line for tune-up and studies. It is required that all of the various intensity and extraction scenarios be accommodated with minimal operator intervention

  16. Nonlinear effects and chromaticity studies for the AGS booster

    Energy Technology Data Exchange (ETDEWEB)

    Parsa, Zohreh [Brookhaven National Lab. (BNL), Upton, NY (United States)

    1987-06-01

    This is a summary of the presentation at the April and May 1987 Accelerator Physics seminars at the Physics Department. It includes a theoretical overview of our formalism and some results of our chromaticity studies for the operation of the Booster. Comparison of our analytic results and those obtained from program HARMON and tracking programs PATRICIA and ORBIT are also included.

  17. Simulation of proton RF capture in the AGS Booster

    International Nuclear Information System (INIS)

    Khiari, F.Z.; Luccio, A.U.; Weng, W.T.

    1988-01-01

    RF capture of the proton beam in the AGS Booster has been simulated with the longitudinal phase-space tracking code ESME. Results show that a capture in excess of 95% can be achieved with multiturn injection of a chopped beam

  18. Fnal booster intensity, extraction, and synchronization control for collider operation

    International Nuclear Information System (INIS)

    Ducar, R.J.; Lackey, J.R.; Tawzer, S.R.

    1987-01-01

    Booster operation for collider physics is considerably different than for fixed target operation. Various scenarios for collider physics, machine studies, and P-Bar targeting may require that the intensity vary from 5E10 PPP to 3E12 PPP at a 15 Hertz machine cycle rate. In addition to the normal Booster single turn extraction mode, collider operations require that the Booster inject into the Main Ring a small number of beam bunches for coalescing into a single high intensity bunch. These bunches must be synchronized such that the center bunch arrives in the RF bucket which corresponds to the zero phase of the coalescing cavity. The system implemented has the ability to deliver a precise fraction of the availability 84 Booster beam bunches to Main Ring or to the P-Bar Debuncher via the newly installed AP-4 beam line for tune-up and studies. It is required that all of the various intensity and extraction scenarios be accommodated with minimal operator intervention

  19. 47 CFR 74.733 - UHF translator signal boosters.

    Science.gov (United States)

    2010-10-01

    ... television broadcast translator station may be authorized to operate one or more signal boosters for the... signals of the parent translator without significantly altering any electrical characteristic of the... Television Broadcast Translator Stations (Form 346, for construction permits; 347, for license to cover...

  20. Innards of a New Injection Septum for the PS Booster

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    The original injection septum was replaced by this new one, of improved design. It is really 4 septum magnets, for the 4 levels of the Booster rings, mounted on a common structure and housed in a single tank. The 50 MeV proton beam from the linac enters the visible septum aperture and moves from right to left.

  1. Multipole stack for the 4 rings of the PS Booster

    CERN Multimedia

    CERN PhotoLab

    1976-01-01

    The PS Booster (originally 800 MeV, now 1.4 GeV) saw first beam in 1972, routine operation began in 1973. The strive for ever higher intensities required the addition of multipoles. Manufacture of 8 stacks of multipoles was launched in 1974, for installation in 1976. For details, see 7511120X.

  2. Enhancing the accelerated beam current in the booster synchrotron ...

    Indian Academy of Sciences (India)

    journal of. April 2016 physics pp. 847–860. Enhancing the accelerated beam current in the booster synchrotron by optimizing the transport line beam propagation ... method. The measured parameters have been used for beam transport line optimization and twiss parameters ... model WATEC 127 LH (CCIR) has been used.

  3. Competence in Lexical Boosters and Nativeness in Academic Writing of English: The Possible Relation

    Science.gov (United States)

    Demir, Cüneyt

    2017-01-01

    Boosters are an important metadiscourse device for writers because it creates an emphatic impression in the reader. In addition, the competence of metadiscourse devices such as boosters is crucial in having native-fluency in academic writing. Therefore, this avoidance of using boosters may spawn foreignness in non-native writers' academic texts.…

  4. Evaluation of the static belt fit provided by belt-positioning booster seats.

    Science.gov (United States)

    Reed, Matthew P; Ebert, Sheila M; Sherwood, Christopher P; Klinich, Kathleen D; Manary, Miriam A

    2009-05-01

    Belt-positioning booster seats are recommended for children who use vehicle seat belts as primary restraints but who are too small to obtain good belt fit. Previous research has shown that belt-positioning boosters reduce injury risk, but the belt fit produced by the wide range of boosters in the US market has not previously been assessed. The present study describes the development of a method for quantifying static belt fit with a Hybrid-III 6-year-old test dummy. The measurement method was applied in a laboratory seat mockup to 31 boosters (10 in both backless and highback modes) across a range of belt geometries obtained from in-vehicle measurements. Belt fit varied widely across boosters. Backless boosters generally produced better lap belt fit than highback boosters, largely because adding the back component moved the dummy forward with respect to the lap belt routing guides. However, highback boosters produced more consistent shoulder belt fit because of the presence of belt routing guides near the shoulder. Some boosters performed well on both lap belt and shoulder belt fit. Lap belt fit in dedicated boosters was generally better than in combination restraints that also can be used with an integrated harness. Results demonstrate that certain booster design features produce better belt fit across a wide range of belt geometries. Lap belt guides that hold the belt down, rather than up, and shoulder belt guides integrated into the booster backrest provided better belt fit.

  5. 78 FR 29062 - Signal Booster Rules

    Science.gov (United States)

    2013-05-17

    ... authorization or use if they operate at frequencies of 1.5 GHz or below and their effective radiated power (ERP) is 1.5 watts or more, or if they operate at frequencies above 1.5 GHz and their ERP is 3 watts or...

  6. Relationship between work rate and oxygen uptake in mitochondrial myopathy during ramp-incremental exercise

    Directory of Open Access Journals (Sweden)

    A.C. Gimenes

    2011-04-01

    Full Text Available We determined the response characteristics and functional correlates of the dynamic relationship between the rate (Δ of oxygen consumption ( O2 and the applied power output (work rate = WR during ramp-incremental exercise in patients with mitochondrial myopathy (MM. Fourteen patients (7 males, age 35.4 ± 10.8 years with biopsy-proven MM and 10 sedentary controls (6 males, age 29.0 ± 7.8 years took a ramp-incremental cycle ergometer test for the determination of the O2 on-exercise mean response time (MRT and the gas exchange threshold (GET. The ΔO2/ΔWR slope was calculated up to GET (S1, above GET (S2 and over the entire linear portion of the response (S T. Knee muscle endurance was measured by isokinetic dynamometry. As expected, peak O2 and muscle performance were lower in patients than controls (P O2/ΔWR than controls, especially the S2 component (6.8 ± 1.5 vs 10.3 ± 0.6 mL·min-1·W-1, respectively; P O2/ΔWR (S T and muscle endurance, MRT-O2, GET and peak O2 in MM patients (P O2/ΔWR below 8 mL·min-1·W-1 had severely reduced peak O2 values (O2 had lower ΔO2/ΔWR (P O2/ΔWR is typically reduced in patients with MM, being related to increased functional impairment and higher cardiopulmonary stress.

  7. Harmonic Mitigation Using a Polarized Ramp-time Current-Controlled Inverter

    Directory of Open Access Journals (Sweden)

    Lawrence J. Borle

    2010-12-01

    Full Text Available This paper describes the implementation of a shunt active power filter for a three-phase four-wire system to compensate for power quality problems generated by mixed non-linear loads, which are a combination of harmonic, reactive and unbalanced components. The filter is a three-phase current-controlled voltage source inverter (CC-VSI with a filter inductor at the AC output and a DC-bus capacitor. The CC-VSI is operated to directly control the grid current to be sinusoidal and in phase with the grid voltage without sensing the load currents. The switching is controlled using polarized ramp-time current control, which is based on the concept of zero average current error (ZACE with a fixed switching frequency. The laboratory experiment results indicate that the filter is able to mitigate predominantly the harmonics, as well as the reactive power, so that the grid currents are sinusoidal, in phase with the grid voltages and symmetrical although the grid voltage contains harmonics.

  8. Virtual stop line strategy to reduce fuel consumption of vehicles at ramp meters

    NARCIS (Netherlands)

    Woldeab, Z.; Vreeswijk, J.; Bie, J.

    2013-01-01

    Ramp meters successfully decrease congestion but leave a burden on the traffic situation at on-ramps. Chaotic queuing leads to many stop-and-go movements and causes inefficiency where fuel consumption is concerned. As part of the eCoMove project, complementary strategies are being designed and

  9. 29 CFR 1918.25 - Bridge plates and ramps (See also § 1918.86).

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Bridge plates and ramps (See also § 1918.86). 1918.25 Section 1918.25 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH... Means of Access § 1918.25 Bridge plates and ramps (See also § 1918.86). (a) Bridge and car plates...

  10. 40 CFR 86.1362-2010 - Steady-state testing with a ramped-modal cycle.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Steady-state testing with a ramped... Exhaust Test Procedures § 86.1362-2010 Steady-state testing with a ramped-modal cycle. This section describes how to test engines under steady-state conditions. For model years through 2009, manufacturers may...

  11. 40 CFR 86.1362-2007 - Steady-state testing with a ramped-modal cycle.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Steady-state testing with a ramped... Exhaust Test Procedures § 86.1362-2007 Steady-state testing with a ramped-modal cycle. This section describes how to test engines under steady-state conditions. Manufacturers may alternatively use the...

  12. Quantification of tsunami-induced flows on a Mediterranean carbonate ramp reveals catastrophic evolution

    NARCIS (Netherlands)

    Slootman, A.; Cartigny, M.J.B.; Moscariello, A.; Chiaradia, M.; de Boer, P.L.

    2016-01-01

    Cool-water carbonates are the dominant limestones in the Mediterranean Basin since the Early Pliocene. Their deposition typically resulted in ramp morphologies due to high rates of resedimentation. Several such fossil carbonate ramps are characterised by a bimodal facies stacking pattern, where

  13. A neutron booster for spallation sources—application to accelerator driven systems and isotope production

    Science.gov (United States)

    Galy, J.; Magill, J.; Van Dam, H.; Valko, J.

    2002-06-01

    One can design a critical system with fissile material in the form of a thin layer on the inner surface of a cylindrical neutron moderator such as graphite or beryllium. Recently, we have investigated the properties of critical and near critical systems based on the use of thin actinide layers of uranium, plutonium and americium. The thickness of the required fissile layer depends on the type of fissile material, its concentration in the layer and on the geometrical arrangement, but is typically in the μm-mm range. The resulting total mass of fissile material can be as low as 100 g. Thin fissile layers have a variety of applications in nuclear technology—for example in the design neutron amplifiers for medical applications and "fast" islands in thermal reactors for waste incineration. In the present paper, we investigate the properties of a neutron booster unit for spallation sources and isotope production. In those applications a layer of fissile material surrounds the spallation source. Such a module could be developed for spallation targets foreseen in the MYRRHA (L. Van Den Durpel, H. Aı̈t Abderrahim, P. D'hondt, G. Minsart, J.L. Bellefontaine, S. Bodart, B. Ponsard, F. Vermeersch, W. Wacquier. A prototype accelerator driven system in Belgium: the Myrrha project, Technical Committee Meeting on Feasibility and Motivation for Hybrid concepts for Nuclear Energy generation and Transmutation, Madrid, Spain, September 17-19, 1997 [1]). or MEGAPIE (M. Salvatores, G.S. Bauer, G. Heusener. The MEGAPIE initiative: executive outline and status as per November 1999, MPO-1-GB-6/0_GB, 1999 [2]) projects. With a neutron multiplication factor of the booster unit in the range 10-20 (i.e. with a keff of 0.9-0.95), considerably less powerful accelerators would be required to obtain the desired neutron flux. Instead of the powerful accelerators with proton energies of 1 GeV and currents of 10 mA foreseen for accelerator driven systems, similar neutron fluxes can be obtained

  14. Improvement of the Performance of Scheduled Stepwise Power Programme Changes within the European Power System

    DEFF Research Database (Denmark)

    Welfonder, E.; Weissbach, T.; Schulz, U.

    2008-01-01

    units. These power imbalances may occur within single control areas or between different control areas. Therefore, as a countermeasure, power output ramps with a standardised ramp duration of 2T ≤ 15 min are required so that no power imbalance occurs during scheduled power programme changes. After...... lead to remarkable power imbalances within the European Power System causing large unintended frequency deviations. In case of these – mostly negative – frequency deviations up to Δf = -150 mHz, considerably more than half of the primary control reserve is activated needlessly, which highly stresses...

  15. Variability of load and net load in case of large scale distributed wind power

    OpenAIRE

    Holttinen, Hannele; Kiviluoma, J.; Estanqueiro, Ana; Gómez-Lázaro, E.; Raw, Barry; Dobschinski, Jan; Meibon, Peter; Lannoye, Eamonn; Aigner, Tobias; Wan, Yih H.; Milligan, Michael

    2011-01-01

    Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates),number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the...

  16. Variability of load and net load in case of large scale distributed wind power

    OpenAIRE

    Holttinen, Hannele; Kiviluoma, Juha; Estanqueiro, Ana; Aigner, Tobias; Wan, Yih-Huei; Milligan, Michael R.

    2010-01-01

    Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net loa...

  17. Ramp-related incidents involving wheeled mobility device users during transit bus boarding/alighting.

    Science.gov (United States)

    Frost, Karen L; Bertocci, Gina; Smalley, Craig

    2015-05-01

    To estimate the prevalence of wheeled mobility device (WhMD) ramp-related incidents while boarding/alighting a public transit bus and to determine whether the frequency of incidents is less when the ramp slope meets the proposed Americans with Disabilities Act (ADA) maximum allowable limit of ≤9.5°. Observational study. Community public transportation. WhMD users (N=414) accessing a public transit bus equipped with an instrumented ramp. Not applicable. Prevalence of boarding/alighting incidents involving WhMD users and associated ramp slopes; factors affecting incidents. A total of 4.6% (n=35) of WhMD users experienced an incident while boarding/alighting a transit bus. Significantly more incidents occurred during boarding (6.3%, n=26) than during alighting (2.2%, n=9) (Pboard/alight when the ramp slope exceeded the proposed ADA maximum allowable ramp slope was 5.1 (95% confidence interval, 2.9-9.0; P9.5° and ramps deployed to street level are associated with a higher frequency of incidents and provision of assistance. Transit agencies should increase awareness among bus operators of the effect kneeling and deployment location (street/sidewalk) have on the ramp slope. In addition, ramp components and the built environment may contribute to incidents. When prescribing WhMDs, skills training must include ascending/descending ramps at slopes encountered during boarding/alighting to ensure safe and independent access to public transit buses. Copyright © 2015 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  18. The ability of laying pullets to negotiate two ramp designs as measured by bird preference and behaviour

    OpenAIRE

    Pettersson, Isabelle C.; Weeks, Claire A.; Norman, Kate I.; Nicol, Christine J.

    2017-01-01

    Background Laying hens are often kept in barn or free-range systems where they must negotiate level changes in the house to access resources. However, collisions and resultant keel fractures are commonplace. Producers sometimes add ramps to make raised areas more accessible but designs vary and very little research has investigated bird preference or behaviour when using different ramp designs, or the effect of ramp design on falls and collisions. Methods Two ramp designs were studied in an e...

  19. Frequency control of RF booster cavity in TRIUMF

    International Nuclear Information System (INIS)

    Fong, K.; Laverty, M.

    1993-01-01

    A booster is used in the TRIUMF cyclotron to increase the energy gain per turn for beam orbits corresponding to energies greater than 370 MeV. It operates at 92.24 MHz, the 4 th harmonic of the cyclotron main rf, and at a nominal voltage of 150 kV. Excitation is provided by a 90 kW rf system that is phase locked to the main rf. When the main rf is interrupted due to sparking or other causes, a controller built into the low frequency source of the booster rf system disables the phase-locked loop, and reconfigures the source as a temperature stabilized oscillator operating at the last locked frequency. When the cyclotron rf is restored it usually will be at different frequency. The oscillator tunes automatically to this new frequency. The acquisition time is extended by the controller to match the response time of the mechanical tuner in the cavity

  20. Non-inductive plasma initiation and plasma current ramp-up on the TST-2 spherical tokamak

    International Nuclear Information System (INIS)

    Takase, Y.; Ejiri, A.; Oosako, T.; Shinya, T.; Ambo, T.; Furui, H.; Kato, K.; Nakanishi, A.; Sakamoto, T.; Kakuda, H.; Wakatsuki, T.; Hashimoto, T.; Hiratsuka, J.; Kasahara, H.; Kumazawa, R.; Mutoh, T.; Saito, K.; Seki, T.; Moeller, C.P.; Nagashima, Y.

    2013-01-01

    Plasma current (I p ) start-up in a spherical tokamak (ST) by waves in the lower-hybrid (LH) frequency range was investigated on TST-2. A low current (∼1 kA) ST configuration can be formed by waves over a broad frequency range (21 MHz–8.2 GHz in TST-2), but further I p ramp-up (to ∼10 kA) is most efficient with waves in the LH frequency range. I p ramp-up to 15 kA was achieved with 60 kW of net RF power P RF in the fast wave (FW) polarization at 200 MHz excited by the inductively coupled combline antenna. X-ray measurements showed that the photon flux and temperature are higher in the direction opposite to I p , consistent with acceleration of electrons by a uni-directional RF wave. There is evidence that the LH wave is excited nonlinearly by the FW, based on the frequency spectra measured by magnetic probes. Similar efficiencies of I p ramp-up were obtained with the inductive combline antenna and the dielectric-loaded waveguide array (‘grill’) antenna, and tendencies for the current drive efficiency to increase with plasma current and toroidal field were observed. During operation of the grill antenna, wavevector components were measured by an array of magnetic probes. Results were qualitatively consistent with expectations based on dispersion relations for the FW and the LH wave. A capacitively coupled combline antenna has been developed to improve coupling to the plasma and the wavenumber spectrum of the excited LH wave, and will be tested in 2013. (paper)

  1. Unleashing the Charges: An Improved Reduction of Key Exoplanet Datasets and a Tool for Ramp Effect Correction

    Science.gov (United States)

    Zhou, Yifan

    2017-08-01

    Among HST's most lasting and iconic results are WFC3/IR observations of transiting exoplanets that provided exciting insights into atmospheres of planets ranging from super-earths to hot-Jupiters. However, all time-resolved WFC3/IR observations suffer from an often-limiting detector systematic: the ramp effect. Current efforts are forced to discard orbits most affected and to apply an empirical procedure to minimize the amplitude. We developed and demonstrated a powerful new, solid state physics-motivated detector model that accurately corrects for the ramp effect and reaches essentially photon-noise limited performance for even the most affected orbits. We propose here to apply our RECTE ramp charge trap correction to key archival datasets for which significant improvements are expected. We will also use these datasets to further test and document the RECTE correction on data acquired in different observing modes and to seek further improvements in RECTE's detector parameters. We will document and release RECTE, along with a data reduction cookbook, to the community. We also expect important improvements in the science results from the four key HST datasets.Our charge trap correction will help increasing HST's efficiency for infrared transit spectroscopy by about 20-25% (no more need to discard first orbits), saving dozens of orbits in the future, and will also improve the reliability and reproducibility of infrared time-domain observations. Our work is especially important for the most challenging transit and phase curve observations and will likely provide an example for an approach that can be utilized for JWST instruments with architectures similar to WFC3.

  2. Assessing the effectiveness of ramp-up during sonar operations using exposure models – a killer whale case study. (abstract)

    NARCIS (Netherlands)

    Benda-Beckmann, A.M. von; Wensveen, P.J.; Kvadsheim, P.H.; Lam, F.P.A.; Miller, P.J.O.; Tyack, P.L.; Ainslie, M.A.

    2013-01-01

    Ramp-up (or soft-start) procedures are commonly used to mitigate the impact of sound on marine mammals. Although this procedure is often adopted as a common-sense approach, studies that quantify the effectiveness of ramp-up are currently lacking. The effectiveness of ramp-up is investigated by

  3. A tool for model based diagnostics of the AGS Booster

    International Nuclear Information System (INIS)

    Luccio, A.

    1993-01-01

    A model-based algorithmic tool was developed to search for lattice errors by a systematic analysis of orbit data in the AGS Booster synchrotron. The algorithm employs transfer matrices calculated with MAD between points in the ring. Iterative model fitting of the data allows one to find and eventually correct magnet displacements and angles or field errors. The tool, implemented on a HP-Apollo workstation system, has proved very general and of immediate physical interpretation

  4. Design of the AGS Booster beam position monitor system

    Energy Technology Data Exchange (ETDEWEB)

    Beadle, E.; Brennan, J.M.; Ciardullo, D.J.; Savino, J.; Stanziani, V.; Thomas, R.; Van Zwienen, W.; Witkover, R.L.; Schulte, E. (Brookhaven National Lab., Upton, NY (USA); European Organization for Nuclear Research, Geneva (Switzerland))

    1989-01-01

    The AGS Booster beam position monitor system must cover a wide range of beam intensity and bunch length for proton and heavy ion acceleration. The detector is designed to maintain 0.1 mm local tolerance following 300{degree}C bakeout. The electronics will be located in the tunnel, communicating via fiber optic links to avoid ground loops. The design will be described and test results for prototype units presented. 5 refs., 4 figs.

  5. Placement Of O-Rings In Solid Rocket Booster

    Science.gov (United States)

    Wood, Charles

    1991-01-01

    Brief report proposes to modify placement of O-ring seals in joints of Solid Rocket Booster of Space Shuttle. Modified joint and seal essentially "inside-out" version of old joint and seal. O-rings placed between outer side of tang and clevis. Joint rotation pushes tang harder against O-rings, thereby making even tighter seal. Proposal derived from analysis of Space Shuttle Challenger disaster, attributed to failure of these O-ring seals.

  6. Study of an energy upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M E; Bartmann, W; Bartolome, S; Bertone, C; Blas, A; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Dahlen, P; Dobers, T; Findlay, A; Folch, R; Gilbert, N; Hansen, J; Hermanns, T; Jensen, S; Le Roux, P; Lopez-Hernandez, L A; Mahner, E; Masi, A; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Nonis, M; Olek, S; Paoluzzi, M; Pittet, S; Puccio, B; Raginel, V; Ruehl, I; Tan, J; Todd, B; Weterings, W; Widorski, W

    2011-01-01

    CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading for increased luminosity in the coming years. In order to overcome bottlenecks in the injector chain, an increase of the beam transfer energy from the CERN Proton Synchrotron Booster (PSB) to the Proton Synchrotron (PS) has been investigated as a possible upgrade scenario. This paper gives an overview of the technical solutions and summarizes the conclusions of the feasibility study.

  7. RF field control for Kaon Factory booster cavities

    International Nuclear Information System (INIS)

    Craig, S.T.; de Jong, M.S.

    1992-08-01

    A conceptual design is developed for control of the Kaon Factory booster rf accelerating fields. This design addresses control of cavity: tuning, voltage amplitude, and voltage phase angle. Time-domain simulations were developed to evaluate the proposed controllers. These simulations indicate that adequate tuning performance can be obtained with the combination of adaptive feed forward and proportional feedback control. Voltage amplitude and voltage phase can be adequately controlled using non-adaptive feed forward and proportional feedback control. (Author) (figs., tabs.)

  8. Power

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård; Fogsgaard, Morten

    2016-01-01

    In this chapter, we will explore the dynamics of power in processes of creativity, and show its paradoxical nature as both a bridge and a barrier to creativity in organisations. Recent social psychological experimental research (Slighte, de Dreu & Nijstad, 2011) on the relation between power...... and floating source for empowering people in the organisation. We will explore and discuss here the potentials, challenges and pitfalls of power in relation to creativity in the life of organisations today. The aim is to demonstrate that power struggles may be utilised as constructive sources of creativity...

  9. Beam lines from Linac 1 to PS and Booster

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    View against the direction of the proton beams. The 50 MeV Linac 1 is behind the concrete wall. Its beam emerges from the hole near the centre of the picture. A switching magnet directs the beam either to the PS (to the right in the sense of the beam; original injection line), or lets it go straight on to the Booster (originally 800 MeV, now 1.4 GeV). The huge drum in the line to the Booster is a "debuncher", driven by the 200 MHz RF of the linac. It reduces the beam's momentum spread. This was the last year of Linac 1 as provider of protons to the Booster. Linac 2, nearly completed at the time of this picture, took up trial delivery at the end of 1978, and routine delivery in 1979. The beam line from Linac 2, barely visible here, can be clearly seen on 7802260. Linac 1 had a second life as an ion accelerator.

  10. JAERI tandem-accelerator and tandem-booster

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, Tadashi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-03-01

    In 1982, aiming at the new development of atomic energy research, the tandem accelerator of Japan Atomic Energy Research Institute (JAERI) was installed. In fiscal year 1993, the superconducting boosters which can increase the ion energy by up to 4 times were added, and the research in the region below 1000 MeV became possible. Those are electrostatic type accelerators which are easy to be used especially in basic research field, and are useful for future research. The tandem accelerator has been operated while maintaining the first class performance as the accelerator for various kinds of heavy ion beam. It has the special shape among electrostatic type accelerators, and is excellent in the easiness of control and stability. The main particulars of the tandem accelerator are shown. As for the ion sources of the tandem accelerator, three cesium sputter type ion sources are installed on two high voltage stands. The kinds of the ions which can be accelerated are mainly negative ions. As the improvement, electron cyclotron resonance (ECR) ion sources are expected to be adopted. As for the tandem boosters, the 1/4 wavelength type resonance hollow cylinder was adopted. The constitution of the tandem boosters is explained. The way of utilizing the tandem accelerator system and the aim for hereafter are reported. (K.I.)

  11. Development of synchronized control method for shaking table with booster device. Verification of the capabilities based on both real facility and numerical simulator

    International Nuclear Information System (INIS)

    Kajii, Shin-ichirou; Yasuda, Chiaki; Yamashita, Toshio; Abe, Hiroshi; Kanki, Hiroshi

    2004-01-01

    In the seismic design of nuclear power plant, it is recently considered to use probability method in a addition to certainty method. The former method is called Seismic Probability Safety Assessment (Seismic PSA). In case of seismic PSA for some components of a nuclear power plant using a shaking table, it is necessary for some limited conditions with high level of accelerations such as actual conditions. However, it might be difficult to achieve the test conditions that a current shaking table based on hydraulic power system is intended for the test facility. Therefore, we have been planning out a test method in which both a current and another shaking table called a booster device are applied. This paper describes the verification test of a synchronized control between a current shaking table and a booster device. (author)

  12. Biomechanics of ramp descent in unilateral trans-tibial amputees: Comparison of a microprocessor controlled foot with conventional ankle-foot mechanisms.

    Science.gov (United States)

    Struchkov, Vasily; Buckley, John G

    2016-02-01

    Walking down slopes and/or over uneven terrain is problematic for unilateral trans-tibial amputees. Accordingly, 'ankle' devices have been added to some dynamic-response feet. This study determined whether use of a microprocessor controlled passive-articulating hydraulic ankle-foot device improved the gait biomechanics of ramp descent in comparison to conventional ankle-foot mechanisms. Nine active unilateral trans-tibial amputees repeatedly walked down a 5° ramp, using a hydraulic ankle-foot with microprocessor active or inactive or using a comparable foot with rubber ball-joint (elastic) 'ankle' device. When inactive the hydraulic unit's resistances were those deemed to be optimum for level-ground walking, and when active, the plantar- and dorsi-flexion resistances switched to a ramp-descent mode. Residual limb kinematics, joints moments/powers and prosthetic foot power absorption/return were compared across ankle types using ANOVA. Foot-flat was attained fastest with the elastic foot and second fastest with the active hydraulic foot (Ptypes. The greater negative 'ankle' work done when using the active hydraulic compared to other two ankle types, explains why there was a corresponding reduction in flexion and negative work at the residual knee. These findings suggest that use of a microprocessor controlled hydraulic foot will reduce the biomechanical compensations used to walk down slopes. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  13. Compatibility of booster seats and vehicles in the U.S. market.

    Science.gov (United States)

    Bing, Julie A; Agnew, Amanda M; Bolte, John H

    2018-05-19

    The objective of this study was to analyze booster and rear vehicle seat dimensions to identify the most frequent compatibility problems. Measurements were collected from 40 high-back and backless boosters and 95 left rear and center rear row seating positions in 50 modern vehicles. Dimensions were compared for 3,800 booster/vehicle seat combinations. For validation and estimation of tolerance and correction factors, 72 booster installations were physically completed and compared with measurement-based compatibility predictions. Dimensions were also compared to the International Organization for Standardization (ISO) volumetric envelopes of forward-facing child restraints and boosters. Seat belt buckles in outboard positions accommodated the width of boosters better than center positions (success rates of 85.4 and 34.7%, respectively). Adequate head restraint clearance occurred in 71.9 to 77.2% of combinations, depending on the booster's head support setting. Booster recline angles aligned properly with vehicle seat cushion angles in 71.5% of combinations. In cases of poor angle alignment, booster angles were more obtuse than the vehicle seat angles 97.7% of the time. Head restraint interference exacerbated angle alignment issues. Data indicate success rates above 90% for boosters being fully supported by the length of the seat cushion and for adequate height clearance with the vehicle roofline. Comparison to ISO envelopes indicates that most boosters on the U.S. market are taller and angled more obtusely than ISO target envelopes. This study quantifies some of the common interferences between boosters and vehicles that may complicate booster usage. Data are useful for design and to prioritize specific problem areas.

  14. A real-time crash prediction model for the ramp vicinities of urban expressways

    Directory of Open Access Journals (Sweden)

    Moinul Hossain

    2013-07-01

    Full Text Available Ramp vicinities are arguably the known black-spots on urban expressways. There, while maintaining high speed, drivers need to respond to several complex events such as maneuvering, reading road signs, route planning and maintaining safe distance from other maneuvering vehicles simultaneously which demand higher level of cognitive response to ensure safety. Therefore, any additional discomfort caused by traffic dynamics may induce driving error resulting in a crash. This manuscript presents a methodology for identifying these dynamically forming hazardous traffic conditions near the ramp vicinities with high resolution real-time traffic flow data. It separates the ramp vicinities into four zones – upstream and downstream of entrance and exit ramps, and builds four separate real-time crash prediction models. Around two year (December 2007 to October 2009 crash data as well as their matching traffic sensor data from Shibuya 3 and Shinjuku 4 expressways under the jurisdiction of Tokyo Metropolitan Expressway Company Limited have been utilized for this research. Random multinomial logit, a forest of multinomial logit models, has been used to identify the most important variables. Finally, a real-time modeling method, Bayesian belief net (BBN, has been employed to build the four models using ramp flow, flow and congestion index in the upstream and flow and speed in the downstream of the ramp location as variables. The newly proposed models could predict 50%, 42%, 43% and 55% of the future crashes with around 10% false alarm for the downstream of entrance, downstream of exit, upstream of entrance and upstream of exit ramps respectively. The models can be utilized in combination with various traffic smoothing measures such as ramp metering, variable speed limit, warning messages through variable message signs, etc. to enhance safety near the ramp vicinities.

  15. Deficiency of RAMP1 attenuates antigen-induced airway hyperresponsiveness in mice.

    Directory of Open Access Journals (Sweden)

    Manyu Li

    Full Text Available Asthma is a chronic inflammatory disease affecting the lung, characterized by breathing difficulty during an attack following exposure to an environmental trigger. Calcitonin gene-related peptide (CGRP is a neuropeptide that may have a pathological role in asthma. The CGRP receptor is comprised of two components, which include the G-protein coupled receptor, calcitonin receptor-like receptor (CLR, and receptor activity-modifying protein 1 (RAMP1. RAMPs, including RAMP1, mediate ligand specificity in addition to aiding in the localization of receptors to the cell surface. Since there has been some controversy regarding the effect of CGRP on asthma, we sought to determine the effect of CGRP signaling ablation in an animal model of asthma. Using gene-targeting techniques, we generated mice deficient for RAMP1 by excising exon 3. After determining that these mice are viable and overtly normal, we sensitized the animals to ovalbumin prior to assessing airway resistance and inflammation after methacholine challenge. We found that mice lacking RAMP1 had reduced airway resistance and inflammation compared to wildtype animals. Additionally, we found that a 50% reduction of CLR, the G-protein receptor component of the CGRP receptor, also ameliorated airway resistance and inflammation in this model of allergic asthma. Interestingly, the loss of CLR from the smooth muscle cells did not alter the airway resistance, indicating that CGRP does not act directly on the smooth muscle cells to drive airway hyperresponsiveness. Together, these data indicate that signaling through RAMP1 and CLR plays a role in mediating asthma pathology. Since RAMP1 and CLR interact to form a receptor for CGRP, our data indicate that aberrant CGRP signaling, perhaps on lung endothelial and inflammatory cells, contributes to asthma pathophysiology. Finally, since RAMP-receptor interfaces are pharmacologically tractable, it may be possible to develop compounds targeting the RAMP1/CLR

  16. Exergetic evaluation of heat pump booster configurations in a low temperature district heating network

    DEFF Research Database (Denmark)

    Ommen, Torben Schmidt; Elmegaard, Brian

    2012-01-01

    In order to minimise losses in a district heating network, one approach is to lower the temperature difference between working media and soil. Considering only direct heat exchange, the minimum forward temperature level is determined by the demand side, as energy services are required at a certain...... temperature. As domestic hot water is required at a temperature range where legionella is no longer a threat, forward temperatures in a traditional low temperature district heating network cannot be lowered beyond approximately 55 ºC. One solution is to boost the temperature of the forward tap water stream...... with a heat pump, as the remaining heat demands are often not required at temperature levels as high as the tap water. The scope of this work is to evaluate the power consumption and second law efficiency of booster heat pumps for tap water production in a low temperature district heating network. The heat...

  17. Design of Air-Cooled Beam Dump for Extraction Line of PS Booster

    CERN Document Server

    Perillo-Marcone, A; Venturi, V; Antonakakis, T; Vlachoudis, V; Nowak, E; Mason, G; Battistin, M; Czapski, M; Sgobba, S

    2013-01-01

    A new beam dump has been designed, which withstands the future proton beam extracted from the Proton Syncrotron Booster (PSB) at CERN, consisting of up to 1E14 protons per pulse at 2 GeV after its upgrade in 2018/2019. In order to be able to efficiently release the deposited heat, the new dump will be made out of a single cylindrical block of a copper alloy and cooled by forced ventilation. In order to determine the energy density distribution deposited by the beam in the dump, Monte Carlo simulations were performed using FLUKA, and thermomechanical analyses carried out by importing the energy density into Ansys. In addition, CFD simulations of the airflow were carried out in order to accurately estimate the heat transfer convection coefficient on the surface of the dump. This paper describes the design process and highlights the constraints of integrating a new dump for increased beam power into the existing facility.

  18. The Nucleation and Propagation of Thrust Ramps: Insights from Quantitative Analysis of Frictional Analog (Sandbox) Models

    Science.gov (United States)

    Sen, P.; Haq, S. S.; Marshak, S.

    2012-12-01

    Particle Imaging Velocimetry (PIV) provides a unique opportunity to analyze deformation in sandbox analog models at a scale that allows documentation of movement within and around individual shear structures. We employed PIV analysis to quantify deformation in sandbox experiments designed to simulate the initiation of thrust ramps developed during crustal shortening (i.e., contractional deformation). Our intent was to answer a long-standing question: Do ramps initiate at the tip of a detachment, or do they initiate in the interior of a deforming layer and propagate up-dip and down-dip until they link to the detachment at a location to the hinterland of the detachment's tip line? Most geometric studies of ramp-flat geometries in fold-thrust belts assume that ramps propagate up-dip from the tip of the detachment, and grow only in one direction. Field studies, in contrast, reveal that layer-parallel shortening structures develop to the foreland of the last ramp to form, suggesting that ramps initiate in a thrust sheet that has already undergone displacement above a detachment. Published sandbox models, using color-sand marker layers, support this idea. To test this idea further, we set up a model using a 3 m-long by 0.31-m wide glass-walled sandbox with a rigid backstop. The sand layer was sifted onto a sheet of mylar that could be pulled beneath the rigid backstop. Sand used in our experiments consisted of <250 μm-diameter grains. We carried out multiple runs using 4 cm, 5 cm and 6 cm-thick layers. Images were acquired over 1 mm displacement intervals using an 18 mega-pixel camera. By moving the camera at specific steps during the experiment, we sampled the development of several thrust ramps. The images taken during experimental runs were analyzed with a MATLAB-based program called 'PIV LAB' that utilizes an image cross-correlation subroutine to determine displacement fields of the sand particles. Our results demonstrate that: (1) thrust ramps initiate within the

  19. Rolling and aging in temperature-ramp soft adhesion

    Science.gov (United States)

    Boniello, Giuseppe; Tribet, Christophe; Marie, Emmanuelle; Croquette, Vincent; Zanchi, Dražen

    2018-01-01

    Immediately before adsorption to a horizontal substrate, sinking polymer-coated colloids can undergo a complex sequence of landing, jumping, crawling, and rolling events. Using video tracking, we studied the soft adhesion to a horizontal flat plate of micron-size colloids coated by a controlled molar fraction f of the poly(lysine)-grafted-poly(N-isopropylacrylamide) (PLL-g-PNIPAM) which is a temperature-sensitive polymer. We ramp the temperature from below to above Tc=32 ±1∘C , at which the PNIPAM polymer undergoes a transition, triggering attractive interaction between microparticles and surface. The adsorption rate, the effective in-plane (x -y ) diffusion constant, and the average residence time distribution over z were extracted from the Brownian motion records during last seconds before immobilization. Experimental data are understood within a rate-equations-based model that includes aging effects and includes three populations: the untethered, the rolling, and the arrested colloids. We show that preadsorption dynamics casts a characteristic scaling function α (f ) proportional to the number of available PNIPAM patches met by soft contact during Brownian rolling. In particular, the increase of in-plane diffusivity with increasing f is understood: The stickiest particles have the shortest rolling regime prior to arrest, so that their motion is dominated by the untethered phase.

  20. Micro-Ramps for External Compression Low-Boom Inlets

    Science.gov (United States)

    Rybalko, Michael; Loth, Eric; Chima, Rodrick V.; Hirt, Stefanie M.; DeBonis, James R.

    2010-01-01

    The application of vortex generators for flow control in an external compression, axisymmetric, low-boom concept inlet was investigated using RANS simulations with three-dimensional (3-D), structured, chimera (overset) grids and the WIND-US code. The low-boom inlet design is based on previous scale model 1- by 1-ft wind tunnel tests and features a zero-angle cowl and relaxed isentropic compression centerbody spike, resulting in defocused oblique shocks and a weak terminating normal shock. Validation of the methodology was first performed for micro-ramps in supersonic flow on a flat plate with and without oblique shocks. For the inlet configuration, simulations with several types of vortex generators were conducted for positions both upstream and downstream of the terminating normal shock. The performance parameters included incompressible axisymmetric shape factor, separation area, inlet pressure recovery, and massflow ratio. The design of experiments (DOE) methodology was used to select device size and location, analyze the resulting data, and determine the optimal choice of device geometry. The optimum upstream configuration was found to substantially reduce the post-shock separation area but did not significantly impact recovery at the aerodynamic interface plane (AIP). Downstream device placement allowed for fuller boundary layer velocity profiles and reduced distortion. This resulted in an improved pressure recovery and massflow ratio at the AIP compared to the baseline solid-wall configuration.

  1. Muscle synergy analysis in transtibial amputee during ramp ascending activity.

    Science.gov (United States)

    Mehryar, P; Shourijeh, M S; Maqbool, H F; Torabi, M; Dehghani-Sanij, A A

    2016-08-01

    In developed countries, the highest number of amputees are elderly with transtibial amputation. Walking on inclined surfaces is difficult for amputees due to loss of muscle volume and strength thereby transtibial amputees (TA) rely on the intact limb to maintain stability. The aim of this study was to use the concatenated non-negative matrix factorization (CNMF) technique to calculate muscle synergy components and compare the difference in muscle synergies and their associated activation profiles in the healthy and amputee groups during ramp ascending (RA) activity. Healthy subjects' dominant leg and amputee's intact leg (IL) were considered for recording surface electromyography (sEMG). The muscle synergies comparison showed a reasonable correlation between the healthy and amputee groups. This suggests the central nervous system (CNS) activates the same group of muscles synergistically. However, the activation coefficient profile (C) results indicated statistically significant difference (p amputee groups. The difference exhibited in activation profiles of amputee's IL could be due to the instability of the prosthetic leg during the GC which resulted in alteration of the IL muscles activations. This information will be useful in rehabilitation and in the future development of prosthetic devices by using the IL muscles information to control the prostheses.

  2. Improving Wind-Ramp Forecasts in the Stable Boundary Layer

    Science.gov (United States)

    Jahn, David E.; Takle, Eugene S.; Gallus, William A.

    2017-06-01

    The viability of wind-energy generation is dependent on highly accurate numerical wind forecasts, which are impeded by inaccuracies in model representation of boundary-layer processes. This study revisits the basic theory of the Mellor, Yamada, Nakanishi, and Niino (MYNN) planetary boundary-layer parametrization scheme, focusing on the onset of wind-ramp events related to nocturnal low-level jets. Modifications to the MYNN scheme include: (1) calculation of new closure parameters that determine the relative effects of turbulent energy production, dissipation, and redistribution; (2) enhanced mixing in the stable boundary layer when the mean wind speed exceeds a specified threshold; (3) explicit accounting of turbulent potential energy in the energy budget. A mesoscale model is used to generate short-term (24 h) wind forecasts for a set of 15 cases from both the U.S.A. and Germany. Results show that the new set of closure parameters provides a marked forecast improvement only when used in conjunction with the new mixing length formulation and only for cases that are originally under- or over-forecast (10 of the 15 cases). For these cases, the mean absolute error (MAE) of wind forecasts at turbine-hub height is reduced on average by 17%. A reduction in MAE values on average by 26% is realized for these same cases when accounting for the turbulent potential energy together with the new mixing length. This last method results in an average reduction by at least 13% in MAE values across all 15 cases.

  3. LHC Report: intensity ramp-up – familiar demons

    CERN Document Server

    Mike Lamont for the LHC team

    2015-01-01

    The first 2015 scrubbing run ended on Friday, 3 July and successfully delivered a well-scrubbed machine ready for operation with a 50 ns beam. This opened the way for the first phase of the so-called beam intensity ramp-up. The last couple of weeks have seen the number of bunches increase from 3 to 476 per beam via periods of 50, 144 and 300 bunches per beam.   The graph plots the rate of LHC beam dumps due to single-event effects (SEE) versus beam luminosity. It is an indication of the importance of tackling this issue.   To verify the full and proper functioning of all systems, operators need at least 3 fills and 20 hours of stable beams without significant problems. After 20 hours, an extensive checklist is signed off by the system experts before the next step up in the number of bunches. The systems involved include magnet protection, radio-frequency, beam instrumentation, collimation, operations, feedback, beam dump and injection. Increasing the total beam intensity poses a numb...

  4. Detecting, categorizing and forecasting large romps in wind farm power output using meteorological observations and WPPT

    DEFF Research Database (Denmark)

    Cutler, N.; Kay, M.; Jacka, K.

    2007-01-01

    The Wind Power Prediction Tool (WPPT) has been installed in Australia for the first time, to forecast the power output from the 65MW Roaring 40s Renewable Energy P/L Woolnorth Bluff Point wind form. This article analyses the general performance of WPPT as well as its performance during large romps...... are not as complicated as Woolnorth Bluff Point. Large ramps are considered critical events for a wind power forecast for energy trading as well as managing power system security. A methodology is developed to detect large ramp events in the wind farm power data. Forty-one large ramp events are detected over I year...... (swings) in power output. In addition to this, detected large ramps are studied in detail and categorized. WPPT combines wind speed and direction forecasts from the Australian Bureau of Meteorology regional numerical weather prediction model, MesoLAPS, with real-time wind power observations to make hourly...

  5. 47 CFR 74.735 - Power limitations.

    Science.gov (United States)

    2010-10-01

    ... Booster Stations § 74.735 Power limitations. (a) The maximum peak effective radiated power (ERP) of an...-13; and (2) 150 kW for UHF channels 14-69. (b) The maximum ERP of a digital low power TV, TV... either omnidirectional or directional antennas, where the ERP values of the vertically and horizontally...

  6. EFFECT OF A PREPREGNANCY PERTUSSIS BOOSTER DOSE ON MATERNAL ANTIBODY TITERS IN YOUNG INFANTS

    OpenAIRE

    Leuridan, Elke; HENS, Niel; Peeters, Natasja; de Witte, Liene; Van der Meeren, Olivier; Van Damme, Pierre

    2011-01-01

    To examine the influence of a pertussis booster vaccination on the transfer of maternal antibodies, 24 nonpregnant women received a tetanus, diphtheria, acellular pertussis booster vaccine between 2 consecutive pregnancies. Blood was drawn from mothers and off-spring. Efficient transplacental antibody transfer and significantly higher antibody titers against 3 pertussis antigens were observed in cord blood and in blood of 1-month-old infants born after a maternal booster vaccination compared ...

  7. A Comparative Study of Boosters in the Discussion Section of Medical and Applied Linguistics Articles

    OpenAIRE

    Islam NamazianDost

    2017-01-01

    This study tried to investigate the role of interpersonal meta-discourse markers such as boosters. In order to illuminate this relation, 15 medical and 15 applied linguistics articles were selected randomly from around 50 articles. Therefore, quantitative and qualitative methods were applied to answer the research questions to identify the frequency and percentage of booster employment in their discussion sections. Moreover, to determine the supposedly meaningful differences between booster a...

  8. Modelling ramp-up curves to reflect learning: improving capacity planning in secondary pharmaceutical production

    DEFF Research Database (Denmark)

    Hansen, Klaus Reinholdt Nyhuus; Grunow, Martin

    2015-01-01

    The experience gained during production ramp-up leads to an increase of the effective production capacity over time. However, full utilisation of production capacity is not always possible during ramp-up. In such cases, the experience gained and hence the available effective capacity...... are overestimated. We develop a new method, which captures ramp-up as a function of the cumulative production volume to better reflect the experience gained while producing the new product. The use of the more accurate and computationally effective approach is demonstrated for the case of secondary pharmaceutical...... production. Due to its regulatory framework, this industry cannot fully exploit available capacities during ramp-up. We develop a capacity planning model for a new pharmaceutical drug, which determines the number and location of new production lines and the build-up of inventory such that product...

  9. Advanced Modeling of Ramp Operations including Departure Status at Secondary Airports, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This project addresses three modeling elements relevant to NASA's IADS research and ATD-2 project, two related to ramp operations at primary airports and one related...

  10. Optimizing density down-ramp injection for beam-driven plasma wakefield accelerators

    Science.gov (United States)

    Martinez de la Ossa, A.; Hu, Z.; Streeter, M. J. V.; Mehrling, T. J.; Kononenko, O.; Sheeran, B.; Osterhoff, J.

    2017-09-01

    Density down-ramp (DDR) injection is a promising concept in beam-driven plasma wakefield accelerators for the generation of high-quality witness beams. We review and complement the theoretical principles of the method and employ particle-in-cell (PIC) simulations in order to determine constrains on the geometry of the density ramp and the current of the drive beam, regarding the applicability of DDR injection. Furthermore, PIC simulations are utilized to find optimized conditions for the production of high-quality beams. We find and explain the intriguing result that the injection of an increased charge by means of a steepened ramp favors the generation of beams with lower emittance. Exploiting this fact enables the production of beams with high charge (˜140 pC ), low normalized emittance (˜200 nm ) and low uncorrelated energy spread (0.3%) in sufficiently steep ramps even for drive beams with moderate peak current (˜2.5 kA ).

  11. First beam test of a combined ramp and squeeze at LHC

    CERN Document Server

    Wenninger, Jorg; Coello De Portugal - Martinez Vazquez, Jaime Maria; Gorzawski, Arkadiusz; Redaelli, Stefano; Schaumann, Michaela; Solfaroli Camillocci, Matteo; CERN. Geneva. ATS Department

    2015-01-01

    With increasing maturity of LHC operation it is possible to envisage more complex beam manipulations. At the same time operational efficiency receives increasing attention. So far ramping the beams to their target energy and squeezing the beams to smaller or higher beta are decoupled at the LHC. (De-)squeezing is always performed at the target energy, currently 6.5 TeV. Studies to combine the ramp and squeeze processes have been made for the LHC since 2011, but so far no experimental test with beam had ever performed. This note describes the first machine experiment with beam aiming at validating the combination of ramp and squeeze, the so-called combined ramp and squeeze (CRS).

  12. Tamping Ramping: Algorithmic, Implementational, and Computational Explanations of Phasic Dopamine Signals in the Accumbens

    Science.gov (United States)

    Lloyd, Kevin; Dayan, Peter

    2015-01-01

    Substantial evidence suggests that the phasic activity of dopamine neurons represents reinforcement learning’s temporal difference prediction error. However, recent reports of ramp-like increases in dopamine concentration in the striatum when animals are about to act, or are about to reach rewards, appear to pose a challenge to established thinking. This is because the implied activity is persistently predictable by preceding stimuli, and so cannot arise as this sort of prediction error. Here, we explore three possible accounts of such ramping signals: (a) the resolution of uncertainty about the timing of action; (b) the direct influence of dopamine over mechanisms associated with making choices; and (c) a new model of discounted vigour. Collectively, these suggest that dopamine ramps may be explained, with only minor disturbance, by standard theoretical ideas, though urgent questions remain regarding their proximal cause. We suggest experimental approaches to disentangling which of the proposed mechanisms are responsible for dopamine ramps. PMID:26699940

  13. Tamping Ramping: Algorithmic, Implementational, and Computational Explanations of Phasic Dopamine Signals in the Accumbens.

    Directory of Open Access Journals (Sweden)

    Kevin Lloyd

    2015-12-01

    Full Text Available Substantial evidence suggests that the phasic activity of dopamine neurons represents reinforcement learning's temporal difference prediction error. However, recent reports of ramp-like increases in dopamine concentration in the striatum when animals are about to act, or are about to reach rewards, appear to pose a challenge to established thinking. This is because the implied activity is persistently predictable by preceding stimuli, and so cannot arise as this sort of prediction error. Here, we explore three possible accounts of such ramping signals: (a the resolution of uncertainty about the timing of action; (b the direct influence of dopamine over mechanisms associated with making choices; and (c a new model of discounted vigour. Collectively, these suggest that dopamine ramps may be explained, with only minor disturbance, by standard theoretical ideas, though urgent questions remain regarding their proximal cause. We suggest experimental approaches to disentangling which of the proposed mechanisms are responsible for dopamine ramps.

  14. Exploration des cadres de construction des rampes d'accessibilité.

    Science.gov (United States)

    Yip, Julie; Herbane, Hakim; Poldma, Tiiu; Rousseau, Jacqueline

    2015-12-01

    Accessibility to buildings promotes social participation through the application of inclusive design. However, architectural frameworks for constructing accessibility ramps are based on scant scientific evidence. This article presents a statement of established standards for construction criteria for accessibility ramps and makes recommendations from the perspective of inclusive design. A literature review was performed using the databases Medline, OTseeker, PsycINFO, and CINAHL (2000 to 2013), combining keywords referring to: universal accessibility, inclusive design, accessibility ramps, biomechanics, obesity, and disabilities. Non-scientific literature was also explored (e.g. building codes). The fifty-eight articles selected were grouped under five themes: 1) ramps and users; 2) materials and climate; 3) visual reference; 4) "wayfinding"; 5) durability, aesthetics and culture. Recommendations encouraging interdisciplinary practice, pegged to inclusive design, are exhibited (e.g. tracking, tilt, contrast).

  15. A Ramp Cosine Cepstrum Model for the Parameter Estimation of Autoregressive Systems at Low SNR

    Directory of Open Access Journals (Sweden)

    Shaikh Anowarul Fattah

    2010-01-01

    Full Text Available A new cosine cepstrum model-based scheme is presented for the parameter estimation of a minimum-phase autoregressive (AR system under low levels of signal-to-noise ratio (SNR. A ramp cosine cepstrum (RCC model for the one-sided autocorrelation function (OSACF of an AR signal is first proposed by considering both white noise and periodic impulse-train excitations. Using the RCC model, a residue-based least-squares optimization technique that guarantees the stability of the system is then presented in order to estimate the AR parameters from noisy output observations. For the purpose of implementation, the discrete cosine transform, which can efficiently handle the phase unwrapping problem and offer computational advantages as compared to the discrete Fourier transform, is employed. From extensive experimentations on AR systems of different orders, it is shown that the proposed method is capable of estimating parameters accurately and consistently in comparison to some of the existing methods for the SNR levels as low as −5 dB. As a practical application of the proposed technique, simulation results are also provided for the identification of a human vocal tract system using noise-corrupted natural speech signals demonstrating a superior estimation performance in terms of the power spectral density of the synthesized speech signals.

  16. ECRH results during current ramp-up and post-pellet injection in FTU plasma

    International Nuclear Information System (INIS)

    Bracco, G.; Bruschi, A.; Buratti, P.

    2001-01-01

    Recent ECRH experiments in FTU have provided new results in two plasma scenarios, both characterized by the absence of the sawtooth activity and by flat or reversed q profiles. The first is the current ramp-up phase where low density plasmas have been heated up to high electron temperature. When the heating is localized on the plasma axis, the high additional power density has produced the evidence of a deformation of the bulk of the local electron distribution function, which is in agreement with the results of a detailed kinetic simulation. When off-axis heating is applied, no clear evidence of non-diffusive energy transport has been found. In the second scenario, ECRH has been applied on the high density plasma produced by pellet injection, resulting in strong ion heating as shown by the increase of the neutron yield. The analysis of this scenario shows that, when the post pellet phase is MHD quiescent, an enhanced energy confinement regime can be obtained with ECRH as found previously in ohmically heated post-pellet plasmas. (author)

  17. Fuel pin behavior under slow ramp-type transient-overpower conditions in the CABRI-FAST experiments

    International Nuclear Information System (INIS)

    Fukano, Yoshitaka; Onoda, Yuichi; Sato, Ikken; Charpenel, Jean

    2009-01-01

    In the CABRI-FAST experimental program, four in-pile tests were performed with slow power-ramp-type transient-overpower conditions (called hereafter as 'slow TOP') to study transient fuel pin behavior under inadvertent control rod withdrawal events in liquid metal cooled fast breeder reactors. Annular-pellet fuel pins were used in three tests, while a solid-pellet fuel pin was used in the other test. All of these pins were pre-irradiated in Phenix. The slow TOP test with a solid-pellet fuel pin was realized as a comparatory test against an existing test (E12) in the CABRI-2 program. In the CABRI-FAST test (BCF1), a power ramp rate of 3% Po/s was applied, while in the CABRI-2 test, 1% Po/s was adopted. Moreover, overpower condition was maintained for a few seconds beyond the observed pin failure in the BCF1 test. In spite of the different power ramp rates, evaluated fuel thermal conditions at the observed failure time are quite similar. The continued overpower condition in the BCF1 test resulted in gradual degradation of the pin structure providing information effective for evaluation of various accident scenarios. Three slow TOP tests with the annular fuel in the CABRI-FAST program resulted in no pin failure showing high failure threshold. Based on post-test examination data and a theoretical evaluation, it was concluded that intra-pin free spaces, such as central hole, macroscopic cracks and fuel-cladding gap effectively mitigated fuel cladding mechanical interaction. It was also clarified that cavity pressurization became effective only in case of very large amount of fuel melting. Furthermore, such cavity pressurization was effectively mitigated by a molten-fuel squirting into the upper blanket region pushing the blanket pellets upward. These CABRI FAST slow TOP tests, in combination with the existing CABRI and TREAT tests, provided an extended slow TOP test database with various fuel and transient conditions. (author)

  18. Truck acceleration behavior study and acceleration lane length recommendations for metered on-ramps

    OpenAIRE

    Yang, Guangchuan; Xu, Hao; Wang, Zhongren; Tian, Zong

    2016-01-01

    This paper investigated the actual truck acceleration capability at metered on-ramps. Truck acceleration performance data were collected through a video-based data collection method. A piecewise constant acceleration model was employed to capture truck acceleration characteristics. It was found that the existing acceleration length will affect truck drivers’ acceleration behavior. At the taper type ramp that has limited acceleration distance, acceleration profile indicated a decreasing trend ...

  19. The Line Operations Safety Audit Program: Transitioning From Flight Operations to Maintenance and Ramp Operations

    Science.gov (United States)

    2011-09-01

    A Line Operations Safety Audit ( LOSA ) is a voluntary safety program that collects safety data during normal airline operations and was originally...maintenance and ramp operations. This report provides a review of the use of LOSA , discusses LOSA’s essential operating characteristics, lessons learned on...the flight deck, and describes the extension of LOSA to maintenance and ramp operations. The research team developed tools for airlines and

  20. Beam Diagnosis and Lattice Modeling of the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Xiaobiao [Indiana Univ., Bloomington, IN (United States)

    2005-09-01

    A realistic lattice model is a fundamental basis for the operation of a synchrotron. In this study various beam-based measurements, including orbit response matrix (ORM) and BPM turn-by-turn data are used to verify and calibrate the lattice model of the Fermilab Booster. In the ORM study, despite the strong correlation between the gradient parameters of adjacent magnets which prevents a full determination of the model parameters, an equivalent lattice model is obtained by imposing appropriate constraints. The fitted gradient errors of the focusing magnets are within the design tolerance and the results point to the orbit offsets in the sextupole field as the source of gradient errors. A new method, the independent component analysis (ICA) is introduced to analyze multiple BPM turn-by-turn data taken simultaneously around a synchrotron. This method makes use of the redundancy of the data and the time correlation of the source signals to isolate various components, such as betatron motion and synchrotron motion, from raw BPM data. By extracting clean coherent betatron motion from noisy data and separates out the betatron normal modes when there is linear coupling, the ICA method provides a convenient means to measure the beta functions and betatron phase advances. It also separates synchrotron motion from the BPM samples for dispersion function measurement. The ICA method has the capability to separate other perturbation signals and is robust over the contamination of bad BPMs. The application of the ICA method to the Booster has enabled the measurement of the linear lattice functions which are used to verify the existing lattice model. The transverse impedance and chromaticity are measured from turn-by-turn data using high precision tune measurements. Synchrotron motion is also observed in the BPM data. The emittance growth of the Booster is also studied by data taken with ion profile monitor (IPM). Sources of emittance growth are examined and an approach to cure

  1. Evolution of plasma wakes in density up- and down-ramps

    Science.gov (United States)

    Zhang, C. J.; Joshi, C.; Xu, X. L.; Mori, W. B.; Li, F.; Wan, Y.; Hua, J. F.; Pai, C. H.; Wang, J.; Lu, W.

    2018-02-01

    The time evolution of plasma wakes in density up- and down-ramps is examined through theory and particle-in-cell simulations. Motivated by observation of the reversal of a linear plasma wake in a plasma density upramp in a recent experiment (Zhang et al 2017 Phys. Rev. Lett. 119 064801) we have examined the behaviour of wakes in plasma ramps that always accompany any plasma source used for plasma-based acceleration. In the up-ramp case it is found that, after the passage of the drive pulse, the wavnumber/wavelength of the wake starts to decrease/increase with time until it eventually tends to zero/infinity, then the wake reverses its propagation direction and the wavenunber/wavelength of the wake begins to increase/shrink. The evolutions of the wavenumber and the phase velocity of the wake as functions of time are shown to be significantly different in the up-ramp and the down-ramp cases. In the latter case the wavenumber of the wake at a particular position in the ramp increases until the wake is eventually damped. It is also shown that the waveform of the wake at a particular time after being excited can be precisely controlled by tuning the initial plasma density profile, which may enable a new type of plasma-based ultrafast optics.

  2. The magnetic field measurements of the booster synchrotron magnet

    International Nuclear Information System (INIS)

    Kumada, Masayuki; Sasaki, Hiroshi; Takikawa, Koji; Someya, Hirohiko; Kurosawa, Toshitake.

    1978-03-01

    The magnetic field properties of the booster synchrotron magnet are investigated. Method of the field measurement, magnetic field measuring system, its data acquisition system and procedure of data processing are described in detail, with a special emphasis on the accuracy in the measurement. The excitation dependences and distributions of the field strength, field gradient, multipole fields and their effective lengths are given and analyzed. The betatron tune and chromaticity are discussed by taking account of the effect of the fringing field as well as the multipole fields of focussing and defocussing sectors. (auth.)

  3. Liquid rocket booster integration study. Volume 5, part 1: Appendices

    Science.gov (United States)

    1988-01-01

    The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is the appendices of the five volume series.

  4. Making the Case for Reusable Booster Systems: The Operations Perspective

    Science.gov (United States)

    Zapata, Edgar

    2012-01-01

    Presentation to the Aeronautics Space Engineering Board National Research Council Reusable Booster System: Review and Assessment Committee. Addresses: the criteria and assumptions used in the formulation of current RBS plans; the methodologies used in the current cost estimates for RBS; the modeling methodology used to frame the business case for an RBS capability including: the data used in the analysis, the models' robustness if new data become available, and the impact of unclassified government data that was previously unavailable and which will be supplied by the USAF; the technical maturity of key elements critical to RBS implementation and the ability of current technology development plans to meet technical readiness milestones.

  5. Summary of the 70 GeV Booster Group

    International Nuclear Information System (INIS)

    Makdisi, Y.; Khiari, F.

    1985-06-01

    The energy range of the 70 GeV SSC booster makes it difficult to employ a single technique for preserving the beam polarization. Results of DEPOL calculations show that the expected resonance strengths are below the .5 x 10 -1 level, which poses no problem for resonance jumping. It was found that a single adiabatically energized Siberian snake will not significantly depolarize the beam. Thus one good solution to the mixing problem is that the snake magnets be energized during the acceleration cycle reaching maximum operating value at 20 GeV, where they take over the resonance jumping role. The possibility of adiabatically energizing two snakes was found to be feasible

  6. Solid Rocket Booster (SRB) Flight System Integration at Its Best

    Science.gov (United States)

    Wood, T. David; Kanner, Howard S.; Freeland, Donna M.; Olson, Derek T.

    2011-01-01

    The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads, environments and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. However, the in-flight data and postflight assessment process revealed the hardware was affected much more strongly than originally anticipated. Assembly and integration of the booster subsystems required acceptance testing of reused hardware components for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed

  7. Report on the access to the deposition areas of the repository. Shaft or Ramp?; Utredning roerande tilltraedesvaegar till djupfoervarets deponeringsomraaden. Schakt eller ramp?

    Energy Technology Data Exchange (ETDEWEB)

    Baeckblom, Goeran [Conrox (Sweden); Christiansson, Rolf; Hedin, Allan; Norman, Fredrik [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Lagerstedt, Leif [SwedPower AB, Stockholm (Sweden)

    2003-05-01

    During year 2002, SKB launched the site-specific engineering of the repository at the Oskarshamn and Oesthammar candidate sites. A part of the ongoing engineering work is to evaluate and possibly select type of access from surface to the underground deposition areas located at a depth of some 400 to 700 metres below the surface. The project objectives are to provide a basis for comparison and to compare generic options for access routes to the underground deposition areas, to formulate preliminary Design Justification Statements for the continued site-specific engineering of access routes to the underground repository and also to describe and exemplify methodology for optimisation of the repository engineering. In consideration of the requirements of SKB, several alternative access options are explored. The main alternatives are a ramp with one or two operational areas at the surface, a ramp with parallel excavation of a blind shaft and an alternative with shafts only. A suite of objective functions were employed in the evaluation of the main alternatives relating to long-term safety, occupational safety during construction and operation, environmental impact, sustainability of natural resources, total cost, schedules, flexibility and project risks. All alternatives studied are feasible and safe, but the alternative with a spiral ramp and a blind shaft is deemed to be the most favourable option. The alternative has the highest flexibility without any tangible disadvantages related neither to long-term safety, environmental impact nor to schedules. It is an advantage that ramp traffic is drastically reduced as rock and backfilling material is transported by the skip rather than by vehicles in the ramp, thereby reducing risks of accidents and fires in the ramp. The concurrent ramp and shaft excavation also shorten the construction period with 18 months for the underground excavations. The discounted total cost is however 100 million Swedish Kronor higher for this

  8. Magnet power supplies for the Advanced Light Source

    International Nuclear Information System (INIS)

    Jackson, L.T.; Lutz, I.C.

    1989-03-01

    The Lawrence Berkeley Laboratory (LBL) is building an Advanced Light Source (ALS) to produce synchrotron radiation. An electron linear accelerator, and a booster synchrotron are used to accelerate the electron beam to 1.5 GeV to fill the storage ring. This paper describes the power supplies used for the magnets in the booster and the storage ring and the interface requirements for computer control and monitoring the power supplies and magnet currents. 1 ref., 3 figs., 2 tabs

  9. M2-F2 Mated to B-52 Mothership on Ramp

    Science.gov (United States)

    1965-01-01

    tests in 1990. In addition, the B-52 served as the air launch platform for the first six Pegasus space boosters. During its many years of service, the B-52 has undergone several modifications. The first major modification was made by North American Aviation (now part of Boeing) in support of the X-15 program. This involved creating a launch-panel-operator station for monitoring the status of the test vehicle being carried, cutting a large notch in the right inboard wing flap to accommodate the vertical tail of the X-15 aircraft, and installing a wing pylon that enables the B-52 to carry research vehicles and test articles to be air-launched/dropped. Located on the right wing, between the inboard engine pylon and the fuselage, this wing pylon was subjected to extensive testing prior to its use. For each test vehicle the B-52 carried, minor changes were made to the launch-panel operator's station. Built originally by the Boeing Company, the NASA B-52 is powered by eight Pratt & Whitney J57-19 turbojet engines, each of which produce 12,000 pounds of thrust. The aircraft's normal launch speed has been Mach 0.8 (about 530 miles per hour) and its normal drop altitude has been 40,000 to 45,000 feet.. It is 156 feet long and has a wing span of 185 feet. The heaviest load it has carried was the No. 2 X-15 aircraft at 53,100 pounds. Project manager for the aircraft is Roy Bryant.

  10. Status of rf development work on a ferrite tuned amplifier cavity for the TRIUMF KAON factory booster ring

    International Nuclear Information System (INIS)

    Poirier, R.L.; Enegren, T.

    1987-01-01

    Of the five synchrotron rings in the proposed TRIUMF KAON factory, the Booster ring to accelerate the proton beam from 440 MeV to 3 GeV has the most demanding rf requirements, primarily because of the relatively large frequency swing of 46.1 MHz to 61.1 MHz at a high repetition rate of 50 Hz. In the current reference design, the Booster lattice has twelve 3.9 m drift spaces with 2.5 m in each drift space available for installation of rf cavities to provide a required effective acceleration voltage of up to 600 kV per turn i.e. 50 kV per cavity. Design and development studies of a suitable cavity-amplifier system are in progress. For the initial reference design a system based on the one used in the Fermilab booster synchrotron has been chosen. That is, a double-gap drift-tube cavity with parallel-biased ferrite tuners and excited with a directly coupled Eimac Y567B tetrode. To meet the tuning and voltage requirements within the various mechanical and other constraints such as tube-to-gap voltage ratio, ferrite power density and available space, the reference design had to be further modified and a cold model of the cavity and tuners was constructed from copper-covered cardboard cylinders. From the results of the cold model measurements a new reference design was established and design work has begun on a full power prototype of the cavity-amplifier system

  11. Atypical tropical sedimentation on a carbonate ramp off Mauritania

    Science.gov (United States)

    Michel, J.; Westphal, H.; Mateu-Vicens, G.; Gürs, K.

    2009-04-01

    Tropical shallow water carbonates are well known as coral reef systems. Here we present a modern example of tropical ramp where typical tropical carbonate elements are missing. The shelf off northern Mauritania is influenced by oceanic upwelling. The upwelling, nutrient-enriched waters warm up on the broad shelf to temperatures typical for many tropical environments. Another peculiarity of this shelf area is that Trade Winds introduce high amounts of eolian dust from the Sahara, further fertilizing the environment. The carbonate grain associations of this depositional setting reflect these conditions. The sediments collected in water depths between 10 and 150 m water depth are characterized by heterozoan carbonate grain associations. They vary from clean coarse-grained, almost pure carbonate sediments to fine-grained sediments with siliciclastic (dust) contents of about 50%. Carbonate components include abundant molluscs, worm tubes and bryozoans, as well as foraminifers, elements that are also abundant in extratropical sediments. While planktonic foraminifers represent the upwelling element, other components (e.g. molluscs) demonstrate the tropical origin of the sediment. The high-nutrient (and thus also low light-penetration) conditions are reflected in the fact that hermatypic shallow-water corals are absent as are calcareous green algae. The Mauritanian sediments represent an environment that is rare in the modern world but might have been more common in the geologic past when global temperatures were higher. On the basis of facies analyses, analogous sediments from the rock record could be misinterpreted as extratropical carbonates when using a high taxonomic level. Closer study allows to distinguish high-nutrient carbonate sediments from extra-tropical sediments, thus improving paleoclimatic reconstruction.

  12. 47 CFR 73.3521 - Mutually exclusive applications for low power television, television translators and television...

    Science.gov (United States)

    2010-10-01

    ... television, television translators and television booster stations. 73.3521 Section 73.3521 Telecommunication... Applicable to All Broadcast Stations § 73.3521 Mutually exclusive applications for low power television, television translators and television booster stations. When there is a pending application for a new low...

  13. Preparations for Upgrading the RF Systems of the PS Booster

    CERN Document Server

    Albright, Simon; Shaposhnikova, Elena

    2016-01-01

    The accelerators of the LHC injector chain need to be upgraded to provide the HL-LHC beams. The PS Booster, the first synchrotron in the LHC injection chain, uses three different RF systems (first, second and up to tenth harmonic) in each of its four rings. As part of the LHC Injector Upgrade the current ferrite RF systems will be replaced with broadband Finemet cavities, increasing the flexibility of the RF system. A Finemet test cavity has been installed in Ring 4 to investigate its effect on machine performance, especially beam stability, during extensive experimental studies. Due to large space charge impedance Landau damping is lost through most of the cycle in single harmonic operation, but is recovered when using the second harmonic and controlled longitudinal emittance blow-up. This paper compares beam parameters during acceleration with and without the Finemet test cavity. Comparisons were made using beam measurements and simulations with the BLonD code based on a full PS Booster impedance model. Thi...

  14. Design and testing of the AGS Booster BPM detector

    International Nuclear Information System (INIS)

    Thomas, R.; Ciardullo, D.J.; Van Zwienen, W.

    1991-01-01

    The AGS Booster beam position monitor system must accurately measure the position of beams and bunches over a wide range of intensity. The frequency of operation must also cover a wide range (600 kHz to 4.2 MHz) since the Booster accelerates both protons and heavy ions. Split-cylinder electrodes were chosen to monitor the position of the beam because of their good low frequency response and high linearity. The need to accelerate low-energy partially-stripped heavy ions requires the pick-up electrodes (PUEs) to operate in a 3 x 10 -11 torr vacuum. The PUEs are to measure the beam position to an absolute accuracy of ±0.5 mm and must therefore be mechanically stable despite the requirements that they be vacuum fired at 950 degree C and baked periodically to 300 degree C. This presentation describes both the mechanical design of the PUEs and the automated test procedure used to ensure the stability, accuracy, and linearity of each unit. 3 refs., 5 figs

  15. Development and evaluation of RAMP I - a practitioner's tool for screening of musculoskeletal disorder risk factors in manual handling.

    Science.gov (United States)

    Lind, Carl Mikael; Forsman, Mikael; Rose, Linda Maria

    2017-10-16

    RAMP I is a screening tool developed to support practitioners in screening for work-related musculoskeletal disorder risk factors related to manual handling. RAMP I, which is part of the RAMP tool, is based on research-based studies combined with expert group judgments. More than 80 practitioners participated in the development of RAMP I. The tool consists of dichotomous assessment items grouped into seven categories. Acceptable reliability was found for a majority of the assessment items for 15 practitioners who were given 1 h of training. The usability evaluation points to RAMP I being usable for screening for musculoskeletal disorder risk factors, i.e., usable for assessing risks, being usable as a decision base, having clear results and that the time needed for an assessment is acceptable. It is concluded that RAMP I is a usable tool for practitioners.

  16. Feasibility demonstration of booster cross-over system for 3 1/2 inch SRB/MLP frangible nut system

    Science.gov (United States)

    1983-01-01

    Recent testing of the SRB/MLP Frangible Nut System (SOS Part Number 114850-9/Boosters P/N 114848-3) at NASA indicated a need to reduce the function time between boosters (2) within a single frangible nut. These boosters are initiated separately by electrical impulse(s). Coupling the output of each detonator with an explosive cross-over would reduce the function time between boosters (independent of electrical impulse) while providing additional redundancy to the system. The objectives of this program were to: provide an explosive cross-over between boosters, reduce function time between boosters to less than one (1) millisecond within a given nut, reduce cost of boosters, be compatible with the existing frangible nut system, and meet requirements of USBI Spec's (nut 10SPC-0030, booster 10SPC-0031).

  17. Effect of reactor finiteness on the boundary condition at the surface of a booster section

    International Nuclear Information System (INIS)

    Wassef, W.A.

    1982-01-01

    Effect of reactor finiteness on the boundary condition at the surface of an absorbing booster embedded in the reactor core is studied and formulated. The model used in these calculations depends on the Pl-Transport coupling technique. This method takes into consideration the rigorous neutron transport behavior inside the booster medium, while the Pl-approximation in the bulk of the scattering medium surrounding the booster which can be considered infinite in most practical applications. The neutron flux gradient parallel to the surface of the booster is considered. The geometrical configuration of the reactor core cross section is circular or rectangular. Finiteness of the reactor is introduced in the general formulation through its dimensions or buckling. Extensive numerical results are given to demonstrate the dependence of the boundary condition at the surface of the booster section on the reactor finiteness and the different physical parameters

  18. Downscaling Solar Power Output to 4-Seconds for Use in Integration Studies (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Hummon, M.; Weekley, A.; Searight, K.; Clark, K.

    2013-10-01

    High penetration renewable integration studies require solar power data with high spatial and temporal accuracy to quantify the impact of high frequency solar power ramps on the operation of the system. Our previous work concentrated on downscaling solar power from one hour to one minute by simulation. This method used clearness classifications to categorize temporal and spatial variability, and iterative methods to simulate intra-hour clearness variability. We determined that solar power ramp correlations between sites decrease with distance and the duration of the ramp, starting at around 0.6 for 30-minute ramps between sites that are less than 20 km apart. The sub-hour irradiance algorithm we developed has a noise floor that causes the correlations to approach ~0.005. Below one minute, the majority of the correlations of solar power ramps between sites less than 20 km apart are zero, and thus a new method to simulate intra-minute variability is needed. These intra-minute solar power ramps can be simulated using several methods, three of which we evaluate: a cubic spline fit to the one-minute solar power data; projection of the power spectral density toward the higher frequency domain; and average high frequency power spectral density from measured data. Each of these methods either under- or over-estimates the variability of intra-minute solar power ramps. We show that an optimized weighted linear sum of methods, dependent on the classification of temporal variability of the segment of one-minute solar power data, yields time series and ramp distributions similar to measured high-resolution solar irradiance data.

  19. Incidence and Detection of Meniscal Ramp Lesions on Magnetic Resonance Imaging in Patients With Anterior Cruciate Ligament Reconstruction.

    Science.gov (United States)

    DePhillipo, Nicholas N; Cinque, Mark E; Chahla, Jorge; Geeslin, Andrew G; Engebretsen, Lars; LaPrade, Robert F

    2017-08-01

    Meniscal ramp lesions have been reported to be present in 9% to 17% of patients undergoing anterior cruciate ligament (ACL) reconstruction. Detection at the time of arthroscopy can be accomplished based on clinical suspicion and careful evaluation. Preoperative assessment via magnetic resonance imaging (MRI) has been reported to have a low sensitivity in identifying meniscal ramp lesions. To investigate the incidence of meniscal ramp lesions in patients with ACL tears and the sensitivity of preoperative MRI for the detection of ramp lesions. Case series; Level of evidence, 4. All patients who underwent ACL reconstruction by a single surgeon between 2010 and 2016 were included in this study, and patients with medial meniscal ramp lesions found at the time of arthroscopy were identified. The sensitivity of MRI compared with the gold standard of arthroscopic evaluation was determined by review of the preoperative MRI musculoskeletal radiologist report, mimicking the clinical scenario. The incidence was calculated based on arthroscopic findings, and the potential secondary signs of meniscal ramp tears were evaluated on MRI. In a consecutive series of 301 ACL reconstructions, 50 patients (33 male, 17 female) with a mean age of 29.6 years (range, 14-61 years) were diagnosed with a medial meniscal ramp lesion at arthroscopic evaluation (16.6% incidence). The sensitivity of MRI for ramp lesions was 48% based on the preoperative MRI report. A secondary finding of a posteromedial tibial bone bruise was identified on preoperative MRI in 36 of the 50 patients with ramp lesions in a retrospective MRI review by 2 orthopaedic surgeons. Medial meniscal ramp lesions were present in approximately 17% of 301 patients undergoing ACL reconstruction, and less than one-half were diagnosed on the preoperative MRI. A posteromedial tibial bone bruise was found to be a secondary sign of a ramp lesion in 72% of patients. Increased awareness of this potentially combined injury pattern is

  20. The oxygen uptake response to incremental ramp exercise: methodogical and physiological issues.

    Science.gov (United States)

    Boone, Jan; Bourgois, Jan

    2012-06-01

    An incremental ramp exercise is a protocol that is frequently used in the domain of exercise testing to get an insight into the exercise tolerance of both healthy active populations (including athletes) and patients, due to the specific characteristics of the protocol. The continuous and linear increase in work rate is not only less strenuous for populations with a very low exercise capacity but it requires the aerobic metabolism to adapt to the continuously changing conditions. Therefore, this protocol can provide important information on the adaptive capacity of individuals to exercise in non-steady-state conditions. The ramp exercise has also been used in the past two decades to get an insight into the underlying mechanisms of the oxygen uptake (·VO₂) response (and kinetics) to exercise. Against the expectations, it has been shown that the parameters that quantify the ·VO₂ response to ramp exercise do not completely correspond to those obtained from constant work-rate transitions and incremental step exercise. For that reason, it could be concluded that the ·VO₂ response is specific to ramp exercise, and thus is determined by other mechanisms than those which determine other protocols. Although the ·VO₂ response to ramp exercise has a high level of reproducibility and a uniform pattern can be observed, especially for the ·VO₂ response below the gas exchange threshold (GET) [above the GET, the ·VO₂ response is less clear], some prudence is necessary when interpreting potential differences in the ·VO₂ response between populations. Several methodological issues (e.g. baseline work rate, ramp slope) exert an important impact on the ·VO₂ response to ramp exercise. The main purpose of this review is to provide an overview of the methodological and physiological factors that have an impact on the ·VO₂ response to ramp exercise. It is of importance that exercise physiologists take these factors into consideration, not only prior to the

  1. Upper flow-regime structures in a Pleistocene carbonate ramp (Favignana, Italy): diagnostic criteria and implications

    Science.gov (United States)

    Slootman, Arnoud; Cartigny, Matthieu; de Boer, Poppe; Moscariello, Andrea

    2017-04-01

    This work presents key diagnostic criteria for the recognition of upper flow-regime sedimentary structures in clastic cool-water carbonate accumulations, illustrated by the excellent exposures of the Pleistocene carbonate ramp succession of Favignana Island (Italy). Cool-water carbonate sedimentation has dominated Mediterranean shelves since the Early Pliocene. Of the various types of marine limestones, cool-water carbonates behave most similar to siliciclastics. They typically develop ramp morphologies with skeletal sand and gravel, consisting of the remains of heterozoan organisms. Resedimentation of this loose carbonate debris during high-energy events such as storms and, more rarely, tsunamis is the norm. Off-ramp supercritical sediment density flows are important contributors to basinward sediment transport as evidenced by the prevalence of backset-stratification bounded by composite erosion surfaces, locally defining spoon-shaped scours-fills, in beds exceeding several metres in thickness. Sedimentary structures created by upper flow-regime bedforms like antidunes, chute-and-pools and cyclic steps as seen on Favignana Island, which form in association with in-phase waves and hydraulic jumps, are not commonly mentioned in carbonate ramp depositional models. For each of the bedforms we present diagnostic criteria to explain otherwise enigmatic sedimentary structures. Thick beds deposited by supercritical sediment density flows have major implications for the distribution of porosity and permeability in carbonate sandstone bodies, especially where they host hydrocarbon and/or water accumulations. The correct identification of upper flow-regime sedimentary structures in carbonate ramp accumulations is therefore important.

  2. Low-Tc ramp-type superconductor-insulator-superconductor Josephson junctions

    International Nuclear Information System (INIS)

    Podt, M; Flokstra, J; Rogalla, H

    2003-01-01

    Superconductor-insulator-superconductor Josephson junctions with an area smaller than 1 μm 2 are increasingly used for many applications because of their low capacitances and short switching times. The characteristics of analogue and digital SQUIDs, for example, can be improved using small-area Josephson junctions. We have developed Nb/Al, AlO x /Al/Nb junctions based on an edge geometry. These low-T c ramp-type junctions allow sub-μm 2 junction areas using micrometre resolution photolithography. The experimental I-V characteristics of the ramp-type junctions showed non-hysteretic behaviour. Using these ramp-type junctions, the first series of dc SQUIDs have been successfully developed. The characteristics of the ramp-type junctions and the dc SQUIDs have been investigated both experimentally and by using numerical simulations. The white flux noise level of a dc SQUID based on ramp-type junctions with an area of 0.2 μm x 12 μm was measured to be √S φ = 1.2μΦ 0 Hz -1/2

  3. Optimizing the current ramp-up phase for the hybrid ITER scenario

    International Nuclear Information System (INIS)

    Hogeweij, G.M.D.; Citrin, J.; Artaud, J.-F.; Imbeaux, F.; Litaudon, X.; Casper, T.A.; Köchl, F.; Voitsekhovitch, I.

    2013-01-01

    The current ramp-up phase for the ITER hybrid scenario is analysed with the CRONOS integrated modelling suite. The simulations presented in this paper show that the heating systems available at ITER allow, within the operational limits, the attainment of a hybrid q profile at the end of the current ramp-up. A reference ramp-up scenario is reached by a combination of NBI, ECCD (UPL) and LHCD. A heating scheme with only NBI and ECCD can also reach the target q profile; however, LHCD can play a crucial role in reducing the flux consumption during the ramp-up phase. The optimum heating scheme depends on the chosen transport model, and on assumptions of parameters like n e peaking, edge T e,i and Z eff . The sensitivity of the current diffusion on parameters that are not easily controlled, shows that development of real-time control is important to reach the target q profile. A first step in that direction has been indicated in this paper. Minimizing resistive flux consumption and optimizing the q profile turn out to be conflicting requirements. A trade-off between these two requirements has to be made. In this paper it is shown that fast current ramp with L-mode current overshoot is at the one extreme, i.e. the optimum q profile at the cost of increased resistive flux consumption, whereas early H-mode transition is at the other extreme. (paper)

  4. Estimation Of Genetic Changes In Rice Mutants After GAMMA Irradiation Using RAPD And RAMP Makers

    International Nuclear Information System (INIS)

    Hoang Thi My Linh; Phan Dinh Thai Son; Nguyen Thi Vang; Le Xuan Tham; Lou de Filippis

    2008-01-01

    Two Vietnamese rice mutants (M2-2 and M2-4 - second generation line 2 and line 4 respectively), induced by gamma irradiation were examined and compared to their parent (TT1), and the Australian cultivar Amaroo (Am) for genomic differences. Tissue cultured shoots provided high yields and good quality of DNA, especially with young rice tissue. Changes in DNA of the mutants in comparison to TT1 and Am were successfully assessed using two molecular techniques known as RAPD-PCR (Random Amplified Polymorphic DNA-Polymerase Chain Reaction) and RAMP-PCR (Random Amplified Microsatellite Polymorphism-Polymerase Chain Reaction). RAMP-PCR was better than RAPD-PCR at disclosing genetic changes between rice cultivars that were closely related, and only RAMP-PCR was able to detect polymorphic bands between TT1 and the mutants. The G-statistic demonstrated that comparisons between Am and TT1, M2-2 or M2-4 showed moderate genetic differentiation, but comparisons between TT1 and M2-2 or M2-4 showed low level of genetic differentiation. Percentage polymorphism between TT1, M2-2, M2-4 and Am detected by RAPD-PCR were similar to those detected by RAMP-PCR (about 10%). The results showed that RAMP-PCR is a versatile, sensitive and cost effective method for genomic analysis between cultivars and mutants. (author)

  5. A New Macro Model for Traffic Flow on a Highway with Ramps and Numerical Tests

    International Nuclear Information System (INIS)

    Tang Tieqiao; Huang Haijun; Zhang Ying; Wong, S.C.; Gao Ziyou

    2009-01-01

    In this paper, we present a new macro model for traffic flow on a highway with ramps based on the existing models. We use the new model to study the effects of on-off-ramp on the main road traffic during the morning rush period and the evening rush period. Numerical tests show that, during the two rush periods, these effects are often different and related to the status of the main road traffic. If the main road traffic flow is uniform, then ramps always produce stop-and-go traffic when the main road density is between two critical values, and ramps have little effect on the main road traffic when the main road density is less than the smaller critical value or greater than the larger critical value. If a small perturbation appears on the main road, ramp may lead to stop-and-go traffic, or relieve or even eliminate the stop-and-go traffic, under different circumstances. These results are consistent with real traffic, which shows that the new model is reasonable.

  6. A fast ramp rate thermally stimulated current technique to quantify electronic charge dynamics in thin films.

    Science.gov (United States)

    Lew, Connie; Thompson, Michael O

    2008-04-01

    Thermally stimulated current (TSC) techniques have been applied to study thermally activated events in many materials. However, the temperature ramp rates in traditional TSC are typically too slow (few degrees per minute) to monitor materials whose properties are strongly time dependent. A fast ramp rate TSC (FR-TSC) technique was developed with ramp rates of 1-5 K/s. This is up to 100 times faster than traditional TSC, so that material changes can be appropriately quantified in the time scale at which they take place. In this paper, the experimental design and challenges to achieve fast and stable ramp rates and to measure the low-level currents are discussed. The fast ramps were attained using a thermoelectric cooler, controlled by a proportional-integral-derivative feedback loop, for both heating and cooling. FR-TSC measurements (1 K/s and 20-100 degrees C) on poly(vinylidene fluoride-trifluoroethylene) ferroelectric thin films are discussed as an example material. From these measurements, thermally activated currents as well as irreversible and reversible charge dynamics were readily distinguished with multiple thermal cycles. These measurements suggest that this technique holds substantial promise in quantifying charge dynamics in fast response materials.

  7. Capacity Estimation for On-Ramp Merging Section of Urban Expressway Based on Time Headway Loss

    Directory of Open Access Journals (Sweden)

    Xing-jian Xue

    2014-01-01

    Full Text Available This paper proposes a model for estimating capacity of on-ramp merging section of urban expressway based on dynamics and gap acceptance theory, considering lane-changing processes and time headway loss. Survey data were collected from on-ramp merging sections of shanghai urban expressway system and showed that capacity drop of on-ramp merging section is caused by drivers’ lane-changing which may lead to unsteady speed of vehicles and so prolonged time headway compared to the minimum time headway corresponding to the maximum capacity. Three parameters (optimal time headway, time headway loss, and interference quantity of lane-changing are given and a methodology by accumulating time headway loss due to lane-changing is developed to estimate the capacity drop. Results’ comparisons between real data and microsimulation of on-ramp merging sections and sensitivity analysis show that the proposed model can produce reliable and accurate results. This study also reveals that ramp flow and the difference between the optimal speed and the lane-changing speed of fleet have a great impact on capacity drop. This study is beneficial to evaluate congestion levels, to understand complex traffic phenomena, and so to find efficient solutions.

  8. Monte Carlo modeling and analyses of YALINA booster subcritical assembly, Part III : low enriched uranium conversion analyses.

    Energy Technology Data Exchange (ETDEWEB)

    Talamo, A.; Gohar, Y. (Nuclear Engineering Division)

    2011-05-12

    This study investigates the performance of the YALINA Booster subcritical assembly, located in Belarus, during operation with high (90%), medium (36%), and low (21%) enriched uranium fuels in the assembly's fast zone. The YALINA Booster is a zero-power, subcritical assembly driven by a conventional neutron generator. It was constructed for the purpose of investigating the static and dynamic neutronics properties of accelerator driven subcritical systems, and to serve as a fast neutron source for investigating the properties of nuclear reactions, in particular transmutation reactions involving minor-actinides. The first part of this study analyzes the assembly's performance with several fuel types. The MCNPX and MONK Monte Carlo codes were used to determine effective and source neutron multiplication factors, effective delayed neutron fraction, prompt neutron lifetime, neutron flux profiles and spectra, and neutron reaction rates produced from the use of three neutron sources: californium, deuterium-deuterium, and deuterium-tritium. In the latter two cases, the external neutron source operates in pulsed mode. The results discussed in the first part of this report show that the use of low enriched fuel in the fast zone of the assembly diminishes neutron multiplication. Therefore, the discussion in the second part of the report focuses on finding alternative fuel loading configurations that enhance neutron multiplication while using low enriched uranium fuel. It was found that arranging the interface absorber between the fast and the thermal zones in a circular rather than a square array is an effective method of operating the YALINA Booster subcritical assembly without downgrading neutron multiplication relative to the original value obtained with the use of the high enriched uranium fuels in the fast zone.

  9. Automatic delamination defect detection in radiographic sequence of rocket boosters

    International Nuclear Information System (INIS)

    Rebuffel, V.; Pires, S.; Caplier, A.; Lamarque, P.

    2003-01-01

    Solid rocket motors are routinely examined in real-time X-ray radioscopic mode. The large and cylindrical boosters are rotating between a high energy source and a two dimensional detector. The purpose of this control is to detect possible defects all through the sample. In the tangential configuration, the part of the object that intersects the X-rays beam is the peripheral one, allowing to detect the delamination defect between the propellant and the external metal envelope. But the defect detectability is very poor due to the strong attenuation of the X-rays through the motors. During the rotation of the booster, the system acquires a sequence of radiographs where the defects are visible over several successive instants. We have previously developed a real-time tomo-synthesis system, processing the radiographs on line, and based on a tomo-synthesis reconstruction algorithm in order to improve the signal-to-noise ratio. This system is installed at the industrial site of Kourou, and is currently used by the operators in charge of the visual inspection of the boosters. In this paper, we present a method that processes the digital images obtained by the system in the purpose of automatically extracting the delamination defects. Due to the size and the poor contrast of the defects, a single image is not sufficient to perform this detection. A spatio-temporal aspect is required for the algorithm to be robust and efficient. In a first step, the proposed method computes the apparent local displacement between the current radiograph and a reference one. This reference image is acquired at the beginning of the rotation, with few noise, and is supposed to be defect free. The apparent displacement is due to the non-perfect rotation positioning. It may be uniform or not, depending on the deformation of the insulation liner of the metallic wall. The images are then registered and compared. On the resulting difference image we apply a smoothed threshold to obtain an

  10. Design of the AGS Booster Ionization Profile Monitor

    International Nuclear Information System (INIS)

    Stillman, A.N.; Thern, R.E.; Witkover, R.L.; Van Zwienen, W.H.

    1991-01-01

    The AGS Booster Ionization Profile Monitor (IPM) must operate in a vacuum of about 3 x 10 -11 Torr. The ultra-high vacuum imposes certain requirements on detector gain and restrictions on construction techniques. Each detector is a two-stage microchannel plate with an integral substrate containing sixty-four printed anodes. Formed electrodes provide uniform collection fields without the use of resistors, which would be unacceptable in these vacuum conditions. An ultra-violet light calibrates the detector in its permanent mounting. An extra set of electrodes performs a first order correction to the perturbations imposed by the horizontal and vertical collection electrodes. This paper will present details of the design of the profile monitor. 4 refs., 2 figs

  11. Improved Longitudinal Blow-up and Shaving in the Booster

    CERN Document Server

    Hancock, S

    2013-01-01

    The low-intensity proton beam for p-Pb collisions in the LHC did not come back in the Booster at the beginning of 2013 anything like it had been set up at the end of 2012. In particular there were unexplained intensity fluctuations of ±100%. Although the root cause of the drift in performance was never established, its investigation revealed long-standing issues in the longitudinal plane which, when corrected, allowed single-bunch beams to be delivered with unprecedented reproducibility and control of both intensity and longitudinal emittance. The new approach was adopted for the ion run and subsequently for MDs at higher intensities, where it made possible a robust control of intensity at constant 6D phase space volume. Post-LS1, it may even provide a platform upon which to build a more exotic controlled longitudinal blow-up to generate higher intensity bunches with a flattened line density.

  12. Design and operation of the AGS Booster Ionization Profile Monitor

    International Nuclear Information System (INIS)

    Stillman, A.N.; Thern, R.E.; Van Zwienen, W.H.; Witkover, R.L.

    1991-01-01

    The AGS Booster Ionization Profile Monitor (IPM) must operate in a vacuum of about 3 x 10 -11 Torr. The ultra-high vacuum imposes certain requirements on detector gain and restrictions on construction techniques. Each detector is a two-stage micro-channel plate with an integral substrate containing sixty-four printed anodes. Formed electrodes provide uniform collection fields without the use of resistors, which would be unacceptable in these vacuum conditions. An ultra-violet light calibrates the detector in its permanent mounting. An extra set of electrodes performs a first order correction to the perturbations imposed by the horizontal and vertical collection electrodes. This paper will present details of the design of the profile monitor and recent operational results. 4 refs., 6 figs

  13. Multipole Stack for the 800 MeV PS Booster

    CERN Multimedia

    1975-01-01

    The 800 MeV PS Booster had seen first beam in its 4 superposed rings in 1972, routine operation began in 1973. In the strive for ever higher beam intensities, the need for additional multipole lenses became evident. After detailed studies, the manufacture of 8 stacks of multipoles was launched in 1974. Each stack consists of 4 superposed multipoles and each multipole has 4 concentric shells. From the innermost to the outermost shell, Type A contains octupole, skew-octupole, sextupole, skew-sextupole. Type B contains skew-octupole, skew-sextupole, vertical dipole, horizontal dipole. Completion of installation in 1976 opened the way to higher beam intensities. M. Battiaz is seen here with a multipole stack and its many electrical connections.

  14. The ramp rate dependence of the sextupole field in superconducting dipoles

    International Nuclear Information System (INIS)

    Ghosh, A.K.; Robins, K.E.; Sampson, W.B.

    1993-01-01

    Sextupole components are induced in the magnetic field of superconducting dipoles when the current is changed. The magnitude of this effect depends on the rate of change of field, the strand-to-strand resistance in the superconducting cable, and the twist pitch of the wire. Ramp rate measurements have been made on a number of SSC dipoles wound from conductors with different interstrand resistances. The technique employed uses an array of Hall probes sensitive to the sextupole field and can measure the difference for field increasing or decreasing as a function of axial position. Magnets with very low interstrand resistance exhibit a large axial oscillation in the sextupole field between up and down ramps which is rate dependent When the strand resistance is high the amplitude of this oscillation is almost independent of ramp rate

  15. Numerical solution of shock and ramp compression for general material properties

    Energy Technology Data Exchange (ETDEWEB)

    Swift, D C

    2009-01-28

    A general formulation was developed to represent material models for applications in dynamic loading. Numerical methods were devised to calculate response to shock and ramp compression, and ramp decompression, generalizing previous solutions for scalar equations of state. The numerical methods were found to be flexible and robust, and matched analytic results to a high accuracy. The basic ramp and shock solution methods were coupled to solve for composite deformation paths, such as shock-induced impacts, and shock interactions with a planar interface between different materials. These calculations capture much of the physics of typical material dynamics experiments, without requiring spatially-resolving simulations. Example calculations were made of loading histories in metals, illustrating the effects of plastic work on the temperatures induced in quasi-isentropic and shock-release experiments, and the effect of a phase transition.

  16. A programmable ramp waveform generator for PEMF exposure studies on chondrocytes.

    Science.gov (United States)

    Jahns, M; Durdle, N; Lou, E; Raso, V J

    2006-01-01

    Osteoarthritis is a debilitating joint disease where the surface of articular cartilage degrades and is unable to repair itself through natural processes. Controlling the migration of transplanted chondrocytes to the defective cartilage non-invasively could be a novel treatment for osteoarthritis. Our research group has performed an in-vitro investigation into the response of cultured human chondrocytes to pulsed electromagnetic fields (PEMF). Development of a treatment for osteoarthritis patients will require the use of a programmable waveform generator to generate the PEMF. This paper discusses the design and testing of a programmable ramp waveform generator for such purpose. When this ramp waveform generator is connected to the PEMF coil driver circuitry, it will be able to produce linearly ramping magnetic fields ranging in strength from 0.5 mT to 4.5 mT. It also has an attainable pulse width ranging from 6 ms to 100 ms, with a selectable duty cycle from 1% to 99%

  17. Booster fans : some considerations for their usage in underground coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Gillies, S.; Slaughter, C. [Missouri Univ. of Science and Technology, Rolla, MO (United States); Calizaya, F. [Utah Univ., Salt Lake City, UT (United States); Wu, H.W. [Gillies Wu Mining Technology Pty Ltd., Brisbane, QLD (Australia)

    2010-07-01

    This paper reported on a study that investigated the conditions under which booster fans can be used safely and efficiently in underground coal mines. Booster fans are installed in series with a main surface fan and are used to boost the air pressure of the ventilation air passing through it. Several coal mining countries use booster fans, but in the United States, they are only used in metal/non-metal mines due to concerns of uncontrolled recirculation. This study investigated installations of booster fans in non-US underground coal mines where safe and efficient atmospheric conditions are achieved. The purpose was to collect reliable information on airway resistances and flow requirements typical in large US coal mines. The study showed that safe booster fan installations are found in both high and low gas conditions, and sometimes where workings are located at great depths. The interlocking systems within the booster fan can control the underground fans and avoid recirculation when surface fans are unexpectedly turned off. Another purpose of the study was to determine when booster fans become a more viable solution in coal mines due to increases in air requirements at higher production rates. It was concluded that a new fan selection algorithm to produce recirculation-free ventilation designs will be developed to enable US coal mine operators to develop ventilation designs to extract coal seams from depths greater than 1000 m. 17 refs., 1 fig.

  18. Performance evaluation of DAAF as a booster material using the onionskin test

    Energy Technology Data Exchange (ETDEWEB)

    Morris, John S [Los Alamos National Laboratory; Francois, Elizabeth G [Los Alamos National Laboratory; Hooks, Daniel E [Los Alamos National Laboratory; Hill, Larry G [Los Alamos National Laboratory; Harry, Herbert H [Los Alamos National Laboratory

    2010-12-02

    Initiation of insensitive high explosive (IHE) formulations requires the use of a booster explosive in the initiation train. Booster material selection is crucial, as the initiation must reliably function across some spectrum of physical parameters. The interest in Diaminoazoxyfurazan (DAAF) for this application stems from the fact that it possesses many traits of an IHE but is shock sensitive enough to serve as an explosive booster. A hemispherical wave breakout test, termed the onionskin test, is one of the methods used to evaluate the performance of a booster material. The wave breakout time-position history at the surface of a hemispherical IHE charge is recorded and the relative uniformity of the breakout can be quantitatively compared between booster materials. A series of onionskin tests were performed to investigate breakout and propagation diaminoazoxyfurazan (DAAF) at low temperatures to evaluate ignition and detonation spreading in comparison to other explosives commonly used in booster applications. Some wave perturbation was observed with the DAAF booster in the onionskin tests presented. The results of these tests will be presented and discussed.

  19. Optimization of Modulation Waveforms for Improved EMI Attenuation in Switching Frequency Modulated Power Converters

    Directory of Open Access Journals (Sweden)

    Deniss Stepins

    2015-01-01

    Full Text Available Electromagnetic interference (EMI is one of the major problems of switching power converters. This paper is devoted to switching frequency modulation used for conducted EMI suppression in switching power converters. Comprehensive theoretical analysis of switching power converter conducted EMI spectrum and EMI attenuation due the use of traditional ramp and multislope ramp modulation waveforms is presented. Expressions to calculate EMI spectrum and attenuation are derived. Optimization procedure of the multislope ramp modulation waveform is proposed to get maximum benefits from switching frequency modulation for EMI reduction. Experimental verification is also performed to prove that the optimized multislope ramp modulation waveform is very useful solution for effective EMI reduction in switching power converters.

  20. Simulation of profile evolution from ramp-up to ramp-down and optimization of tokamak plasma termination with the RAPTOR code

    Science.gov (United States)

    Teplukhina, A. A.; Sauter, O.; Felici, F.; Merle, A.; Kim, D.; the TCV Team; the ASDEX Upgrade Team; the EUROfusion MST1 Team

    2017-12-01

    The present work demonstrates the capabilities of the transport code RAPTOR as a fast and reliable simulator of plasma profiles for the entire plasma discharge, i.e. from ramp-up to ramp-down. This code focuses, at this stage, on the simulation of electron temperature and poloidal flux profiles using prescribed equilibrium and some kinetic profiles. In this work we extend the RAPTOR transport model to include a time-varying plasma equilibrium geometry and verify the changes via comparison with ATSRA code simulations. In addition a new ad hoc transport model based on constant gradients and suitable for simulations of L-H and H-L mode transitions has been incorporated into the RAPTOR code and validated with rapid simulations of the time evolution of the safety factor and the electron temperature over the entire AUG and TCV discharges. An optimization procedure for the plasma termination phase has also been developed during this work. We define the goal of the optimization as ramping down the plasma current as fast as possible while avoiding any disruptions caused by reaching physical or technical limits. Our numerical study of this problem shows that a fast decrease of plasma elongation during current ramp-down can help in reducing plasma internal inductance. An early transition from H- to L-mode allows us to reduce the drop in poloidal beta, which is also important for plasma MHD stability and control. This work shows how these complex nonlinear interactions can be optimized automatically using relevant cost functions and constraints. Preliminary experimental results for TCV are demonstrated.

  1. Meniscal Ramp Lesion Repair by a Trans-septal Portal Technique.

    Science.gov (United States)

    Buyukdogan, Kadir; Laidlaw, Michael S; Miller, Mark D

    2017-08-01

    The identification of meniscal ramp lesions can be quite difficult or even impossible with conventional anterior arthroscopic viewing and working portals. Although even the use of transnotch viewing maneuvers into the posteromedial compartment increases the likelihood of diagnosis, it is the posteromedial and trans-septal portals that provide the best direct visualization of these many times "hidden lesions." In this surgical technique description, we describe a method to not only adequately visualize the ramp lesion, but also provide subtle variations to existing surgical techniques that can help limit injury to neurovascular structures as well as gain satisfactory vertical suture repair of this posteromedial meniscocapsular injury.

  2. Properties of Phase Transition of Traffic Flow on Urban Expressway Systems with Ramps and Accessory Roads

    International Nuclear Information System (INIS)

    Mei Chaoqun; Liu Yejin

    2011-01-01

    In this paper, we develop a cellular automaton model to describe the phase transition of traffic flow on urban expressway systems with on-off-ramps and accessory roads. The lane changing rules are given in detailed, the numerical results show that the main road and the accessory road both produce phase transitions. These phase transitions will often be influenced by the number of lanes, lane changing, the ramp flow, the input flow rate, and the geometry structure. (interdisciplinary physics and related areas of science and technology)

  3. Echocardiographic outflow pump ramp test in centrifugal-flow left ventricular assist device.

    Science.gov (United States)

    Iacovoni, Attilio; Vittori, Claudia; Fontana, Alessandra; Carobbio, Alessandra; Fino, Carlo; D'Elia, Emilia; Terzi, Amedeo; Senni, Michele

    2017-04-18

    This study sought to develop a novel echocardiogram outflow ramp test to detect device malfunctions in centrifugal-flow left ventricular assist devices (LVADs). This new ramp pump test is based on the direct analyses of systolic and diastolic ratio (S/D) Doppler velocity in the outflow cannula in the HeartWare LVAD during progressive increases in speed. The results showed that in patients with normal pump function, the Doppler velocity S/D ratio gradually decreased during LVAD speed increases. This test is easily performed and seems promising to detect normal pump function in patients assisted by a centrifugal flow LVAD.

  4. Case Report of Multiembolic Cerebrovascular Event Associated with Ramp Study Echocardiogram

    Directory of Open Access Journals (Sweden)

    Brian C. Butera

    2017-01-01

    Full Text Available The incidence of ramp test echocardiogram-associated embolic events in the setting of therapeutic anticoagulation is likely rare and has not been reported. We present such a case in a patient with a HeartMate II left ventricular assist device (LVAD whose serial head computed tomography images, deteriorating clinical course, and the multiembolic nature of the event suggest causality. If the pretest probability of pump thrombosis in an individual LVAD patient is sufficiently high, the potential risks of performing a ramp study echocardiogram may not be warranted, even in the setting of adequate anticoagulation.

  5. Deep repository for spent nuclear fuel. Facility description - Layout E. Spiral ramp with one operational area

    Energy Technology Data Exchange (ETDEWEB)

    Pettersson, Stig [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Forsgren, Ebbe [SwedPower AB, Stockholm (Sweden); Lange, Fritz [Lange Art AB, Stockholm (Sweden)

    2002-04-01

    This report documents a proposal for the design of the deep repository for spent nuclear fuel. The proposal is based on the principles that were formulated in the original KBS-3 study, but has been supplemented by investigations and experience to reflect current knowledge. The purpose of the report is to provide an integrated picture of the deep repository, as a basis for SKB's other work, e.g. environmental impact assessments, transport systems, safety issues and alternative locations, and to provide a co-ordinated account of the conditions and requirements concerning all of the necessary functions in the deep repository in order to have a well functioning facility. In addition, it should be possible to use the report as: a tool in the task of achieving a co-ordinated, safe and accepted design for the facility, a basis for further planning and costing, a basis for adaptation to geographic and other conditions for the particular location, a basis for information material, both within SKB and for interested parties outside, such as public authorities, municipalities and the general public. The capacity of the deep repository has been chosen on the basis of 40 years of operation of the Swedish nuclear power reactors, which will produce approximately 9,000 tons of uranium, equivalent to approximately 4,500 canisters. The design outlined is based on theoretical analyses of functions, safety requirements, procedures etc. that can be identified during the various phases of the construction and operation of the repository. In addition, preliminary organisation and staffing plans have been drawn up, for use as the basis for planning the necessary buildings. The report gives a vision of the overall layout and function of the facility, and a proposal for the design of all individual parts of the repository. The relationships between the various parts of the repository are described, both above and below ground, as is the interplay between the part above ground and part

  6. Deep repository for spent nuclear fuel. Facility description - Layout E. Spiral ramp with one operational area

    International Nuclear Information System (INIS)

    Pettersson, Stig; Forsgren, Ebbe; Lange, Fritz

    2002-04-01

    This report documents a proposal for the design of the deep repository for spent nuclear fuel. The proposal is based on the principles that were formulated in the original KBS-3 study, but has been supplemented by investigations and experience to reflect current knowledge. The purpose of the report is to provide an integrated picture of the deep repository, as a basis for SKB's other work, e.g. environmental impact assessments, transport systems, safety issues and alternative locations, and to provide a co-ordinated account of the conditions and requirements concerning all of the necessary functions in the deep repository in order to have a well functioning facility. In addition, it should be possible to use the report as: a tool in the task of achieving a co-ordinated, safe and accepted design for the facility, a basis for further planning and costing, a basis for adaptation to geographic and other conditions for the particular location, a basis for information material, both within SKB and for interested parties outside, such as public authorities, municipalities and the general public. The capacity of the deep repository has been chosen on the basis of 40 years of operation of the Swedish nuclear power reactors, which will produce approximately 9,000 tons of uranium, equivalent to approximately 4,500 canisters. The design outlined is based on theoretical analyses of functions, safety requirements, procedures etc. that can be identified during the various phases of the construction and operation of the repository. In addition, preliminary organisation and staffing plans have been drawn up, for use as the basis for planning the necessary buildings. The report gives a vision of the overall layout and function of the facility, and a proposal for the design of all individual parts of the repository. The relationships between the various parts of the repository are described, both above and below ground, as is the interplay between the part above ground and part below

  7. Report on the access to the deposition areas of the repository. Shaft or Ramp?

    International Nuclear Information System (INIS)

    Baeckblom, Goeran; Christiansson, Rolf; Hedin, Allan; Norman, Fredrik; Lagerstedt, Leif

    2003-05-01

    During year 2002, SKB launched the site-specific engineering of the repository at the Oskarshamn and Oesthammar candidate sites. A part of the ongoing engineering work is to evaluate and possibly select type of access from surface to the underground deposition areas located at a depth of some 400 to 700 metres below the surface. The project objectives are to provide a basis for comparison and to compare generic options for access routes to the underground deposition areas, to formulate preliminary Design Justification Statements for the continued site-specific engineering of access routes to the underground repository and also to describe and exemplify methodology for optimisation of the repository engineering. In consideration of the requirements of SKB, several alternative access options are explored. The main alternatives are a ramp with one or two operational areas at the surface, a ramp with parallel excavation of a blind shaft and an alternative with shafts only. A suite of objective functions were employed in the evaluation of the main alternatives relating to long-term safety, occupational safety during construction and operation, environmental impact, sustainability of natural resources, total cost, schedules, flexibility and project risks. All alternatives studied are feasible and safe, but the alternative with a spiral ramp and a blind shaft is deemed to be the most favourable option. The alternative has the highest flexibility without any tangible disadvantages related neither to long-term safety, environmental impact nor to schedules. It is an advantage that ramp traffic is drastically reduced as rock and backfilling material is transported by the skip rather than by vehicles in the ramp, thereby reducing risks of accidents and fires in the ramp. The concurrent ramp and shaft excavation also shorten the construction period with 18 months for the underground excavations. The discounted total cost is however 100 million Swedish Kronor higher for this

  8. Ramp Study Hemodynamics, Functional Capacity, and Outcome in Heart Failure Patients with Continuous-Flow Left Ventricular Assist Devices

    DEFF Research Database (Denmark)

    Jung, Mette H; Gustafsson, Finn; Houston, Brian

    2016-01-01

    Ramp studies-measuring changes in cardiac parameters as a function of serial pump speed changes (revolutions per minute [rpm])-are increasingly used to evaluate function and malfunction of continuous-flow left ventricular assist devices (CF-LVADs). We hypothesized that ramp studies can predict fu...

  9. Design of the New Wideband RF System for the CERN PS Booster

    CERN Document Server

    Paoluzzi, Mauro; Angoletta, Maria Elena; Arnaudon, Luca; Energico, Salvatore; Findlay, Alan; Haase, Matthias; Jaussi, Michael; Jones, Anthony; Landré, David; Molendijk, John; Quartullo, Danilo; Shaposhnikova, Elena

    2016-01-01

    For the renovation and upgrade of the CERN PS Booster (PSB) RF systems a development project was launched in 2012. The design, based on a new approach, aimed at replacing the existing tuned, narrowband RF systems with wideband, modular, solid-state driven units. A wide range of issues had to be addressed spanning from RF power production, radiation hardness of solid-state devices, active cancellation of beam-induced voltages, dedicated low-level electronics allowing multi-harmonic operation and beam stability. Following a three-year prototyping and testing campaign and two international reviews, the project endorsement came at the end of year 2015. It foresees the complete removal of present h1, h2 and h10 systems and the deployment of a new one covering all the frequency ranges from 1 MHz to 18 MHz. The four PSB rings will be equipped with 144 identical acceleration cells providing 24 kV total RF voltage per ring. This paper describes the design concepts, the retained solutions, the expected performances and...

  10. Design, construction and tests of a 3 GHz proton linac booster (LIBO) for cancer therapy

    Science.gov (United States)

    Berra, Paolo

    2007-12-01

    In the last ten years the use of proton beams in radiation therapy has become a clinical tool for treatment of deep-seated tumours. LIBO is a RF compact and low cost proton linear accelerator (SCL type) for hadrontherapy. It is conceived by TERA Foundation as a 3 GHz Linac Booster, to be mounted downstream of an existing cyclotron in order to boost the energy of the proton beam up to 200 MeV, needed for deep treatment (~25 cm) in the human body. With this solution it is possible to transform a low energy commercial cyclotron, normally used for eye melanoma therapy, isotope production and nuclear physics research, into an accelerator for deep-seated tumours. A prototype module of LIBO has been built and successfully tested with full RF power at CERN and with proton beam at INFN Laboratori Nazionali del Sud (LNS) in Catania, within an international collaboration between TERA Foundation, CERN, the Universities and INFN groups of Milan and Naples. The mid-term aim of the project is the technology transfer of the accumulated know-how to a consortium of companies and to bring this novel medical tool to hospitals. The design, construction and tests of the LIBO prototype are described in detail.

  11. Modeling ramp compression experiments using large-scale molecular dynamics simulation.

    Energy Technology Data Exchange (ETDEWEB)

    Mattsson, Thomas Kjell Rene; Desjarlais, Michael Paul; Grest, Gary Stephen; Templeton, Jeremy Alan; Thompson, Aidan Patrick; Jones, Reese E.; Zimmerman, Jonathan A.; Baskes, Michael I. (University of California, San Diego); Winey, J. Michael (Washington State University); Gupta, Yogendra Mohan (Washington State University); Lane, J. Matthew D.; Ditmire, Todd (University of Texas at Austin); Quevedo, Hernan J. (University of Texas at Austin)

    2011-10-01

    Molecular dynamics simulation (MD) is an invaluable tool for studying problems sensitive to atomscale physics such as structural transitions, discontinuous interfaces, non-equilibrium dynamics, and elastic-plastic deformation. In order to apply this method to modeling of ramp-compression experiments, several challenges must be overcome: accuracy of interatomic potentials, length- and time-scales, and extraction of continuum quantities. We have completed a 3 year LDRD project with the goal of developing molecular dynamics simulation capabilities for modeling the response of materials to ramp compression. The techniques we have developed fall in to three categories (i) molecular dynamics methods (ii) interatomic potentials (iii) calculation of continuum variables. Highlights include the development of an accurate interatomic potential describing shock-melting of Beryllium, a scaling technique for modeling slow ramp compression experiments using fast ramp MD simulations, and a technique for extracting plastic strain from MD simulations. All of these methods have been implemented in Sandia's LAMMPS MD code, ensuring their widespread availability to dynamic materials research at Sandia and elsewhere.

  12. The Role of Archives and Records Management in National Information Systems: A RAMP Study.

    Science.gov (United States)

    Rhoads, James B.

    Produced as part of the United Nations Educational, Scientific, and Cultural Organization (UNESCO) Records and Archives Management Programme (RAMP), this publication provides information about the essential character and value of archives and about the procedures and programs that should govern the management of both archives and current records,…

  13. Optimizing the current ramp-up phase for the hybrid ITER scenario

    NARCIS (Netherlands)

    Hogeweij, G. M. D.; Artaud, J. F.; Casper, T. A.; Citrin, J.; Imbeaux, F.; Kochl, F.; Litaudon, X.; Voitsekhovitch, I.; ITM-TF ITER Scenario Modelling Group,

    2013-01-01

    The current ramp-up phase for the ITER hybrid scenario is analysed with the CRONOS integrated modelling suite. The simulations presented in this paper show that the heating systems available at ITER allow, within the operational limits, the attainment of a hybrid q profile at the end of the current

  14. Optimizing density down-ramp injection for beam-driven plasma wakefield accelerators

    Directory of Open Access Journals (Sweden)

    A. Martinez de la Ossa

    2017-09-01

    Full Text Available Density down-ramp (DDR injection is a promising concept in beam-driven plasma wakefield accelerators for the generation of high-quality witness beams. We review and complement the theoretical principles of the method and employ particle-in-cell (PIC simulations in order to determine constrains on the geometry of the density ramp and the current of the drive beam, regarding the applicability of DDR injection. Furthermore, PIC simulations are utilized to find optimized conditions for the production of high-quality beams. We find and explain the intriguing result that the injection of an increased charge by means of a steepened ramp favors the generation of beams with lower emittance. Exploiting this fact enables the production of beams with high charge (∼140  pC, low normalized emittance (∼200  nm and low uncorrelated energy spread (0.3% in sufficiently steep ramps even for drive beams with moderate peak current (∼2.5  kA.

  15. Integrated Variable Speed Limits Control and Ramp Metering for Bottleneck Regions on Freeway

    Directory of Open Access Journals (Sweden)

    Ming-hui Ma

    2015-01-01

    Full Text Available To enhance the efficiency of the existing freeway system and therefore to mitigate traffic congestion and related problems on the freeway mainline lane-drop bottleneck region, the advanced strategy for bottleneck control is essential. This paper proposes a method that integrates variable speed limits and ramp metering for freeway bottleneck region control to relieve the chaos in bottleneck region. To this end, based on the analyses of spatial-temporal patterns of traffic flow, a macroscopic traffic flow model is extended to describe the traffic flow operating characteristic by considering the impacts of variable speed limits in mainstream bottleneck region. In addition, to achieve the goal of balancing the priority of the vehicles on mainline and on-ramp, increasing capacity, and reducing travel delay on bottleneck region, an improved control model, as well as an advanced control strategy that integrates variable speed limits and ramp metering, is developed. The proposed method is tested in simulation for a real freeway infrastructure feed and calibrates real traffic variables. The results demonstrate that the proposed method can substantially improve the traffic flow efficiency of mainline and on-ramp and enhance the quality of traffic flow at the investigated freeway mainline bottleneck.

  16. Simultaneous Provision of Flexible Ramping Product and Demand Relief by Interruptible Loads Considering Economic Incentives

    Directory of Open Access Journals (Sweden)

    Jiahua Hu

    2017-12-01

    Full Text Available To cope with the net load variability in real time, sufficient ramp capability from controllable resources is required. To address the issue of insufficient ramp capacity in real time operations, flexible ramping products (FRPs have been adopted by some Independent System Operators (ISOs in the USA as a new market design. The inherent variability and uncertainty caused by renewable energy sources (RESs call for new FRP providers apart from conventional generating units. The so-called interruptible load (IL has proved to be useful in maintaining the supply-demand balance by providing demand relief and can be a viable FRP provider in practice. Given this background, this work presents a stochastic real-time unit commitment model considering ramp requirement and simultaneous provision of IL for FRP and demand relief. Load serving entities (LSEs are included in the proposed model and act as mediators between the ISO and multiple ILs. In particular, incentive compatible contracts are designed to encourage customers to reveal their true outage costs. Case studies indicate both the system and LSEs can benefit by employing the proposed method and ILs can gain the highest profits by signing up a favorable contract.

  17. A Possible Alternative Exercise Test for Youths with Cystic Fibrosis : The Steep Ramp Test

    NARCIS (Netherlands)

    Bongers, Bart C.; Werkman, Maarten S.; Arets, H. G. M.; Takken, Tim; Hulzebos, H. J.

    Purpose: The steep ramp test (SRT) can be used to provide an indication of exercise capacity when gas exchange measurements are not possible. This study evaluated the clinical usefulness of the SRT in adolescents with cystic fibrosis (CF) and compared the physiological responses of the SRT with the

  18. Non-timber forest products: ramps in the Waynesville, NC watershed

    Science.gov (United States)

    Kristina Connor; Jim Chamberlain III; Hilliard Gibbs Jr.; Matt Winn

    2015-01-01

    The potential of forest farming was noted as far back as 1929, but the recognition of its importance dates back only 20 to 30 years. The U.S. market for harvested foods and medicinal plants from forests now exceeds $4 billion annually. Ramps (Allium tricoccum Aiton), or wild leeks, grow in patches in the rich moist forests of the eastern United...

  19. Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

    Science.gov (United States)

    Hayashi, Miwa; Hoang, Ty; Jung, Yoon C.; Malik, Waqar; Lee, Hanbong; Dulchinos, Victoria L.

    2015-01-01

    This paper proposes a new departure pushback decision-support tool (DST) for airport ramp-tower controllers. It is based on NASA's Spot and Runway Departure Advisor (SARDA) collaborative decision-making concept, except with the modification that the gate releases now are controlled by tactical pushback (or gate-hold) advisories instead of strategic pre-assignments of target pushback times to individual departure flights. The proposed ramp DST relies on data exchange with the airport traffic control tower (ATCT) to coordinate pushbacks with the ATCT's flow-management intentions under current operational constraints, such as Traffic Management Initiative constraints. Airlines would benefit in reduced taxi delay and fuel burn. The concept was evaluated in a human-in-the-loop simulation experiment with current ramp-tower controllers at the Charlotte Douglas International Airport as participants. The results showed that the tool helped reduce taxi time by one minute per flight and overall departure flight fuel consumption by 10-12% without reducing runway throughput. Expect Departure Clearance Time (EDCT) conformance also was improved when advisories were provided. These benefits were attained without increasing the ramp-tower controllers' workload. Additionally, the advisories reduced the ATCT controllers' workload.

  20. A RAMP marker linked to the tobacco black shank resistant gene ...

    African Journals Online (AJOL)

    Bulk segregant analysis (BSA) and randomly amplified microsatellite polymorphism (RAMP) were employed to analyze F2 individuals of the Yunyan 317×Hubei 517 to screen and characterize molecular markers linked to black shank resistant gene. A total of 800 arbitrary decamer oligonucleotide primerpairs were used for ...

  1. Truck acceleration behavior study and acceleration lane length recommendations for metered on-ramps

    Directory of Open Access Journals (Sweden)

    Guangchuan Yang

    2016-10-01

    Full Text Available This paper investigated the actual truck acceleration capability at metered on-ramps. Truck acceleration performance data were collected through a video-based data collection method. A piecewise constant acceleration model was employed to capture truck acceleration characteristics. It was found that the existing acceleration length will affect truck drivers’ acceleration behavior. At the taper type ramp that has limited acceleration distance, acceleration profile indicated a decreasing trend with distance. While for the ramp with an auxiliary lane that has sufficient acceleration distance, it was found that the acceleration behavior is to have a high acceleration rate in the beginning, then acceleration rate decrease with speed increase, and high acceleration rate again as drivers approach the merging area. Field data show that the truck acceleration performance data documented in the ITE’s (Institute of Transportation Engineers “Traffic Engineering Handbook” are much lower than the field collected data. Also, based on the regression analysis of speed versus distance profiles, it was found that the AASHTO’s (American Association of State Highway and Transportation Officials Green Book acceleration length design guidance is insufficient to accommodate trucks at metered on-ramps. The required acceleration lengths for medium and heavy trucks are approximately 1.3 and 1.6 times of the Green Book design guideline, respectively.

  2. Start-up and ramp-up of the PLT tokamak by lower hybrid waves

    International Nuclear Information System (INIS)

    Jobes, F.C.; von Goeler, S.; Bernabei, S.

    1985-01-01

    Lower hybrid current drive (LHCD) is an inherently steady-state means of maintaining the poloidal field of a tokamak reactor. However, the energy losses of LHCD, which are proportional to density, are projected to be too great in a fusion reactor for LHCD to be economically feasible during the burn state of the reaction cycle. The authors maintain that LHCD could be extremely useful in restoring poloidal field energy between burns. In situations not requiring a rapid build up, LHCD appears, by extrapolation from present experiments, to be capable of supplying the full required poloidal field energy. In this paper, experiments have been performed on PLT and other tokamaks to examine the role of LHCD in start-up and ramp-up, as well as to examine the efficiency of stady-state current drice. Both the start-up and the ramp-up experiments were quite successful, with the start-up experiment obtaining currents up to 20% of full current for PLT, and the ramp-up experiments obtaining ramp-up efficiencies of approximately 20%

  3. School Counselors' Roles in RAMP and PBIS: A Phenomenological Investigation (Part Two)

    Science.gov (United States)

    Goodman-Scott, Emily; Grothaus, Tim

    2018-01-01

    Researchers conducted a qualitative, phenomenological investigation of the lived experiences of a sample of 10 school counselors in current or recent RAMP (Recognized ASCA [American School Counselor Association] Model Program) schools that also implemented positive behavioral interventions and supports (PBIS) with high fidelity. Researchers found…

  4. Phase-ramp reduction in interseismic interferograms from pixel-offsets

    KAUST Repository

    Wang, Teng

    2014-05-01

    Interferometric synthetic aperture radar (InSAR) is increasingly used to measure interseismic deformation. Inaccurate satellite-orbit information, expressed as phase ramps across interseismic interferograms, is believed to be one of the main sources of error in such measurements. However, many interferograms exhibit higher phase gradients than expected from the reported orbital accuracy, suggesting that there are other error sources. Here, we show that interferogram phase ramps are in part caused by uncorrected satellite timing-parameter errors. We propose a two-step approach to reduce the phase ramps using pixel-offsets estimated between SAR amplitude images. The first step involves using a digital elevation model (DEM) to estimate absolute timing-parameter errors for the reference image of the SAR dataset and the second step updates the timing parameters of the master image for each interferogram. We demonstrate a clear ramp reduction on interseismic interferograms covering the North Anatolian Fault in eastern Turkey. The resulting interferograms show clear signs of interseismic deformation even before stacking. © 2014 IEEE.

  5. Eddy current heating of irregularly shaped plates by slow ramped fields

    International Nuclear Information System (INIS)

    Dresner, L.

    1979-01-01

    Theorems are presented for estimating eddy current heating of irregularly shaped plates by a perpendicular ramped field. The theorems, which are derived from two complementary variational principles, give upper and lower bounds to the eddy current heating. Illustrative results are given for rectangles, isosceles triangles, sectors of circular annuli, rhombuses, and L-shaped plates. A comparison is made with earlier work

  6. Efficiency promotion for an on-ramp system based on intelligent transportation system information

    International Nuclear Information System (INIS)

    Dong-Fan, Xie; Zi-You, Gao; Xiao-Mei, Zhao

    2010-01-01

    The effect of cars with intelligent transportation systems (ITSs) on traffic flow near an on-ramp is investigated by car-following simulations. By numerical simulations, the dependences of flux on the inflow rate are investigated for various proportions of cars with ITSs. The phase diagrams as well as the spatiotemporal diagrams are presented to show different traffic flow states on the main road and the on-ramp. The results show that the saturated flux on the main road increases and the free flow region is enlarged with the increase of the proportion of cars with ITS. Interestingly, the congested regions of the main road disappear completely when the proportion is larger than a critical value. Further investigation shows that the capacity of the on-ramp system can be promoted by 13% by using the ITS information, and the saturated flux on the on-ramp can be kept at an appropriate value by adjusting the proportion of cars with ITS. (general)

  7. TRACC_PB SOSS Integrated Traffic Simulation for CLT Ramp Operation

    Science.gov (United States)

    Okuniek, Nikolai; Zhu, Zhifan

    2017-01-01

    This presentation provides the current task under the NASA-DLR research collaboration for airport surface. It presents the effort done to adapt TRACC and SOSS software components to simulate airport (CLT) ramp area traffic management using TRACC's conflict free taxi trajectory optimization and SOSS's fast time simulation platform.

  8. AN OPTIMAL REPLENISHMENT POLICY FOR DETERIORATING ITEMS WITH RAMP TYPE DEMAND UNDER PERMISSIBLE DELAY IN PAYMENTS

    Directory of Open Access Journals (Sweden)

    Dr. Sanjay Jain

    2010-10-01

    Full Text Available The aim of this paper is to develop an optimal replenishment policy for inventory models of deteriorating items with ramp type demand under permissible delay in payments. Deterioration of items begins on their arrival in stock.  An example is also presented to illustrate the application of developed model.

  9. ITER-like current ramps in JET with ILW: experiments, modelling and consequences for ITER

    Czech Academy of Sciences Publication Activity Database

    Hogeweij, G.M.D.; Calabrò, G.; Sips, A.C.C.; Maggi, C.F.; De Tommasi, G.M.; Joffrin, E.; Loarte, A.; Maviglia, F.; Mlynář, Jan; Rimini, F.G.; Pütterich, T.

    2015-01-01

    Roč. 55, č. 1 (2015), 013009-013009 ISSN 0029-5515 Institutional support: RVO:61389021 Keywords : tokamak * ramp-up * JET * ITER Subject RIV: BL - Plasma and Gas Discharge Physics Impact factor: 4.040, year: 2015 http://iopscience.iop.org/article/10.1088/0029-5515/55/1/013009#metrics

  10. Enhancement of Nanosat Launch Vehicle Booster Main Engine Using 3D Additive Manufacturing Techniques

    Data.gov (United States)

    National Aeronautics and Space Administration — Applying additive manufacturing (AM) technology in development at NASA MSFC to improve a LOX/propylene booster engine for a nanosatellite launch vehicle. This...

  11. Injection Bucket Jitter Compensation Using Phase Lock System at Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Seiya, K. [Fermilab; Drennan, C. [Fermilab; Pellico, W. [Fermilab; Chaurize, S. [Fermilab

    2017-05-12

    The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster rf count and the Recycler Ring revolution marker. A one rf bucket jitter in the ex-traction bucket position results from the variability of the process that phase matches the Booster to the Recycler. However, the new slow phase lock process used to lock the frequency and phase of the Booster rf to the Recycler rf has been made digital and programmable and has been modified to correct the extraction notch position. The beam loss at the Recycler injection has been reduced by 20%. Beam studies and the phase lock system will be discussed in this paper.

  12. Effects of 1980 technology on weight of a recovery system for a one million pound booster

    Science.gov (United States)

    Eckstrom, C. V.

    1975-01-01

    The effects were evaluated of 1980 technology on the weight of recovery systems capable of decelerating a one-million-pound booster to vertical velocities of 60 or 30 ft/sec at sea level impact. A nominal set of booster staging conditions were assumed and there were no constraints on parachute size, number or type. The effects of new materials that would be available by 1980, the effects of booster attitude during entry, various parachute staging methods, parachute reefing schemes, parachute-retro rocket hybrid systems, and the effects of dividing the booster into separate pieces for recovery were evaluated. It was determined that for the systems considered, a hybrid parachute-retro-rocket recovery system would have the minimum weight. New materials now becoming available for parachute fabrication should result in a 37-percent reduction in hybrid recovery system weight for an impact velocity of 30 fps.

  13. Continuous synchronization scheme for TRIUMF KAON Factory Booster and Collector by heterodyne with intermediate frequency

    International Nuclear Information System (INIS)

    Koscielniak, S.R.

    1992-08-01

    Often it arises that several batches of protons must be transferred in box-car fashion from a Booster to Main Ring synchrotron. When the combination (i) large change in kinematic β, (ii) γ-transition close to γ-beam, (iii) small radial aperture confining Δp/p s steering, and (iv) absence of magnetic flat top, occur in the Booster, then conventional phase slip methods of synchronization become infeasible. An alternative is to heterodyne the Booster revolution frequency with an intermediate frequency (of predetermined phase variation) so as to produce a signal equal to a harmonic of the main ring revolution frequency. This allows elaboration of a synchronization control. This paper describes computer modelling of the synchronization technique, as applied to the KAON Factory Booster and Collector, including the effects of error sources and beam-control loops. 4 figs

  14. Study on the Structures of Two Booster Pellets Having High Initiation Capacity

    Science.gov (United States)

    Shuang-Qi, Hu; Hong-Rong, Liu; Li-shuang, Hu; Xiong, Cao; Xiang-Chao, Mi; Hai-Xia, Zhao

    2014-05-01

    Insensitive munitions (IM) improve the survivability of both weapons and their associated platforms, which can lead to a reduction in casualties, mission losses, and whole life costs. All weapon systems contain an explosive train that needs to meet IM criteria but reliably initiate a main charge explosive. To ensure that these diametrically opposed requirements can be achieved, new highly effective booster charge structures were designed. The initiation capacity of the two booster pellets was studied using varied composition and axial-steel-dent methods. The results showed that the two new booster pellets can initiate standard main charge pellets with less explosive mass than the ordinary cylindrical booster pellet. The numerical simulation results were in good agreement with the experiment results.

  15. Air Force Reusable Booster System A Quick-look, Design Focused Modeling and Cost Analysis Study

    Science.gov (United States)

    Zapata, Edgar

    2011-01-01

    Presents work supporting the Air force Reusable Booster System (RBS) - A Cost Study with Goals as follows: Support US launch systems decision makers, esp. in regards to the research, technology and demonstration investments required for reusable systems to succeed. Encourage operable directions in Reusable Booster / Launch Vehicle Systems technology choices, system design and product and process developments. Perform a quick-look cost study, while developing a cost model for more refined future analysis.

  16. Response to booster doses of hepatitis B vaccine among young adults who had received neonatal vaccination.

    Directory of Open Access Journals (Sweden)

    Paul K S Chan

    Full Text Available Newborns who have received hepatitis B immunization in 1980s are now young adults joining healthcare disciplines. The need for booster, pre- and post-booster checks becomes a practical question.The aim of this study is to refine the HBV vaccination policy for newly admitted students in the future.A prospective study on medical and nursing school entrants to evaluate hepatitis B serostatus and the response to booster doses among young adults.Among 212 students, 17-23-year-old, born after adoption of neonatal immunization, 2 (0.9% were HBsAg positive, 40 (18.9% were anti-HBs positive. At 1 month after a single-dose booster for anti-HBs-negative students, 14.5% had anti-HBs 100 mIU/mL, respectively. The anti-HBs levels were significantly higher for females than males (mean [SD]: 431 [418] vs. 246 [339] mIU/mL, P = 0.047. At 2-4 month after the third booster dose, 97.1% had anti-HBs >100 mIU/mL and 2.9% had 10-100 mIU/mL.Pre-booster check is still worthwhile to identify carriers among newly recruited healthcare workers born after adoption of neonatal immunization. A 3-dose booster, rather than a single dose, is required for the majority to achieve an anti-HBs level >100 mIU/mL, as memory immunity has declined in a substantial proportion of individuals. Cost-effectiveness of post-booster check for anti-HBs is low and should be further evaluated based on contextual specific utilization of results.

  17. Pertussis booster vaccine for adolescents and young adults in São Paulo, Brazil

    OpenAIRE

    Freitas, Angela Carvalho; Okano, Valdir; Pereira, Júlio Cesar Rodrigues

    2011-01-01

    OBJECTIVE: To develop a model to assess different strategies of pertussis booster vaccination in the city of São Paulo. METHODS: A dynamic stationary age-dependent compartmental model with waning immunity was developed. The "Who Acquires Infection from Whom" matrix was used to modeling age-dependent transmission rates. There were tested different strategies including vaccine boosters to the current vaccination schedule and three of them were reported: (i) 35% coverage at age 12, or (ii) 70% c...

  18. Multi-area unit commitment with ramp-rate limits

    International Nuclear Information System (INIS)

    Wang, C.; Shahidehpour, S.M.

    1992-01-01

    This paper reports that there are two tasks considered in power system generation scheduling. One is the unit commitment which determines the unit start up and shut down schedules in order to minimize the system fuel expenditure. The other is the economic dispatch which assigns the system load demand to the committed generating units for minimizing the power generation cost. The economic operation attracts a great deal of attention as a modest reduction in percentage fuel cost leads to a large saving in the system operation costs. Many studies for power system generation scheduling have successfully applied various mathematical algorithms such as Lagrangian relaxation, dynamic programming, and artificial intelligence techniques e.g., expert systems, artificial neural networks (ANN), etc. The AI techniques have incorporated the system practical operational policies in the mathematical techniques to improve system models considerably. The mechanism of ANN simulates the learning process of the human brain. One class of ANN learns the knowledge through examples, or training facts, composed by various inputs and their corresponding outputs. The extent of the intelligibility of ANN depends upon the diversity of the training facts. For an input which is not in the training facts, the trained ANN can estimate an output based on its previous knowledge about the problem

  19. A real time status monitor for transistor bank driver power limit resistor in boost injection kicker power supply

    Energy Technology Data Exchange (ETDEWEB)

    Mi, J.; Tan, Y.; Zhang, W.

    2011-03-28

    For years suffering of Booster Injection Kicker transistor bank driver regulator troubleshooting, a new real time monitor system has been developed. A simple and floating circuit has been designed and tested. This circuit monitor system can monitor the driver regulator power limit resistor status in real time and warn machine operator if the power limit resistor changes values. This paper will mainly introduce the power supply and the new designed monitoring system. This real time resistor monitor circuit shows a useful method to monitor some critical parts in the booster pulse power supply. After two years accelerator operation, it shows that this monitor works well. Previously, we spent a lot of time in booster machine trouble shooting. We will reinstall all 4 PCB into Euro Card Standard Chassis when the power supply system will be updated.

  20. Mixed Linear/Square-Root Encoded Single Slope Ramp Provides a Fast, Low Noise Analog to Digital Converter with Very High Linearity for Focal Plane Arrays

    Science.gov (United States)

    Wrigley, Christopher James (Inventor); Hancock, Bruce R. (Inventor); Newton, Kenneth W. (Inventor); Cunningham, Thomas J. (Inventor)

    2014-01-01

    An analog-to-digital converter (ADC) converts pixel voltages from a CMOS image into a digital output. A voltage ramp generator generates a voltage ramp that has a linear first portion and a non-linear second portion. A digital output generator generates a digital output based on the voltage ramp, the pixel voltages, and comparator output from an array of comparators that compare the voltage ramp to the pixel voltages. A return lookup table linearizes the digital output values.

  1. Occupational, speech and emotional therapy with students attending booster classes.

    Science.gov (United States)

    Regev, Dafna; Reiter, Shunit

    2011-01-01

    The current study reviews the work being carried out in the Naomi Therapeutic Center in Kiryat Yam, Israel. The staff in this Center decided to provide a holistic response (which includes occupational therapy, speech therapy and art therapy) to 50 elementary school special education students in five booster classes. The goal of the study was to enable these students to improve their self-image, demonstrate fewer classroom adaptive behavioral problems and bring them to function better in class by the end of the school year. Findings demonstrate that in the study group, students' self-image scores were significantly higher at the end of the intervention program than they were prior to the intervention (p = 0.040). In addition, the study group demonstrated a significant difference in adaptive behavior scores before and after the intervention, indicating fewer adaptive classroom behavior problems towards the end of the intervention (p = 0.034). Finally, findings indicate that there was a significant improvement in students' functioning on all of the occupational therapy categories.

  2. LHC Pilot Bunches from the CERN PS Booster

    CERN Document Server

    Benedikt, Michael

    2003-01-01

    For the first commissioning phase of the LHC, a single proton bunch is required. The production of this so-called "LHC pilot bunch" will follow a different scheme than the one of the nominal LHC proton bunch train. Both the transverse and the longitudinal LHC bunch characteristics should already be established in the PS Booster. The parameter space for the LHC pilot bunch spans a factor 66 in beam brightness. To cover the whole parameter space, a mixture of several ingredients was required: intensity adjustment with low voltage rf-capture; definition of the transverse emittance with shavers; controlled blow-up followed by longitudinal shaving to define the longitudinal emittance. All beam variants were produced on harmonic two, with only one bunch being sent to the downstream accelerator chain. To cover also the lowest intensity side, the Linac beam was reduced by a factor 5 with a "sieve". The pilot bunches corresponding to the "corners" of the parameter space and a few selected inner reference points were s...

  3. Slip-stacking Dynamics and the 20 Hz Booster

    Energy Technology Data Exchange (ETDEWEB)

    Eldred, Jeffery; Zwaska, Robert

    2015-03-01

    Slip-stacking is an accumulation technique used at Fermilab since 2004 which nearly doubles the proton intensity. The Proton Improvement Plan II intensity upgrades require a reduction in slip-stacking losses by approximately a factor of 2. We study the single-particle dynamics that determine the stability of slip-stacking particles. We introduce universal area factors to calculate the available phase space area for any set of beam parameters without individual simulation. We show the particle loss as a function of time. We calculate the injection efficiency as a function of longitudinal emittance and aspect-ratio. We demonstrate that the losses from RF single particle dynamics can be reduced by a factor of 4-10 (depending on beam parameters) by upgrading the Fermilab Booster from a 15-Hz cycle-rate to a 20-Hz cycle-rate. We recommend a change in injection scheme to eliminate the need for a greater momentum aperture in the Fermilab Recycler.

  4. [Postdoctoral lecturer thesis in medicine: academic competence or career booster?].

    Science.gov (United States)

    Sorg, H; Betzler, C; Grieswald, C; Schwab, C G G; Tilkorn, D J; Hauser, J

    2016-06-01

    The postdoctoral lecturer thesis in medicine represents an essential success factor for the career of a physician; however, there is controversial discussion on whether this reflects academic competence or is more a career booster. In this context we conducted a survey among postdoctoral medical lecturers with the aim to evaluate the significance of this qualification. The online survey was performed using a questionnaire requesting biographical parameters and subjective ratings of topics concerning the postdoctoral lecturer thesis. Overall 628 questionnaires were included in the study. The significance of the postdoctoral qualification was rated high in 68.6 % and was seen to be necessary for professional advancement in 71.0 %. The chances of obtaining a full professorship after achieving a postdoctoral qualification were rated moderate to low (68.1 %); nevertheless, 92.3 % would do it again and 86.5 % would recommend it to colleagues. Accordingly, 78.8 % were against its abolishment. Wishes for reforms included standardized federal regulations, reduced dependency on professors and more transparency. The postdoctoral lecturer qualification in medicine is highly valued and the majority of responders did not want it to be abolished. Although the chances for a full professorship were only rated low, successful graduation seems to be beneficial for the career; however, there is a need for substantial structural and international changes.

  5. Overview of the Pegasus Air-Launched Space Booster

    Science.gov (United States)

    Lindberg, Robert E.

    1989-09-01

    The Pegasus Air-Launched Space Booster is an innovative new space launch vehicle now under full-scale development in a privately-funded joint venture by Orbital Sciences Corporation (OSC) and Hercules Aerospace Company. Pegasus is a three-stage, solid-propellant, inertially-guided, all-composite winged vehicle that is launched at an altitude of 40,000 ft from its carrier aircraft. The 41,000 lb vehicle can deliver payloads as massive as 900 lb to low earth orbit. This status report on the Pegasus developemt program first details the advantages of the airborne launch concept, then describes the design and performance of the Pegasus vehicle and conlcludes with a review of the progress of the program from its conception in April 1987 through September 1989. First launch of Pegasus is scheduled for October 31, 1989, under contract to the Defense Advanced Research Projects Agency (DARPA). The second flight under the DARPA contract will be held several months later.

  6. Using Simple Statistical Analysis of Historical Data to Understand Wind Ramp Events

    Energy Technology Data Exchange (ETDEWEB)

    Kamath, C

    2010-01-29

    As renewable resources start providing an increasingly larger percentage of our energy needs, we need to improve our understanding of these intermittent resources so we can manage them better. In the case of wind resources, large unscheduled changes in the energy output, called ramp events, make it challenging to keep the load and the generation balanced. In this report, we show that simple statistical analysis of the historical data on wind energy generation can provide insights into these ramp events. In particular, this analysis can help answer questions such as the time period during the day when these events are likely to occur, the relative severity of positive and negative ramps, and the frequency of their occurrence. As there are several ways in which ramp events can be defined and counted, we also conduct a detailed study comparing different options. Our results indicate that the statistics are relatively insensitive to these choices, but depend on utility-specific factors, such as the magnitude of the ramp and the time interval over which this change occurs. These factors reflect the challenges faced by schedulers and operators in keeping the load and generation balanced and can change over the years. We conduct our analysis using data from wind farms in the Tehachapi Pass region in Southern California and the Columbia Basin region in Northern Oregon; while the results for other regions are likely to be different, the report describes the benefits of conducting simple statistical analysis on wind generation data and the insights that can be gained through such analysis.

  7. Sequence architecture of a Jurassic ramp succession from Gebel Maghara (North Sinai, Egypt: Implications for eustasy

    Directory of Open Access Journals (Sweden)

    Ahmed Awad Abdelhady

    2015-07-01

    Full Text Available The Jurassic succession at Gebel Maghara, North Sinai, Egypt, represents a mixed carbonate–siliciclastic sequence. Combining information from both fossils and rocks allowed a plausible reconstruction of the depositional environments and of the basin evolution. The Jurassic succession of Gebel Maghara was deposited on a ramp, and the architecture of the ramp facies was strongly controlled not only by sea–level changes but also by extensional tectonics in connection with rifting of the Tethys, North Gondwana. Seven tectonically modified thirdorder sequences (DS 1–DS 7 have been recognized. The first three sequences (DS 1–DS 3, ranging from the Toarcian to the Bajocian, record sea invasion (intertidal to shallow subtidal conditions across an intracratonic area as a result of eustatic sea–level changes during a quiescent rift stage. The remaining sequences (DS 4–DS 7 reflect open marine mid to outer ramp settings. Non–marine conditions around the Bajocian–Bathonian boundary, documented by caliche, represent the maximum regression of the sea. During an active extensional stage, horsts, which formerly acted as barriers separating the Maghara sub–basin from the main ocean, subsided. Subsequent rejuvenation and reactivation of faults shifted the homoclinal physiography of the ramp to a distally steepened ramp during the early Bathonian, creating a 200–m–thick deltaic wedge. Similar processes during the early Kimmeridgian created a calcirudite–calcarenite succession of slope origin. The diversity and the epifaunal/infaunal percentage of the macrofauna display a cyclic pattern which coincides more or less with the sequence stratigraphic architecture.

  8. True Triaxial Experimental Study of Rockbursts Induced By Ramp and Cyclic Dynamic Disturbances

    Science.gov (United States)

    Su, Guoshao; Hu, Lihua; Feng, Xiating; Yan, Liubin; Zhang, Gangliang; Yan, Sizhou; Zhao, Bin; Yan, Zhaofu

    2018-04-01

    A modified rockburst testing system was utilized to reproduce rockbursts induced by ramp and cyclic dynamic disturbances with a low-intermediate strain rate of 2 × 10-3-5 × 10-3 s-1 in the laboratory. The experimental results show that both the ramp and cyclic dynamic disturbances play a significant role in inducing rockbursts. In the tests of rockbursts induced by a ramp dynamic disturbance, as the static stress before the dynamic disturbance increases, both the strength of specimens and the kinetic energy of the ejected fragments first increase and then decrease. In the tests of rockbursts induced by a cyclic dynamic disturbance, there exists a rockburst threshold of the static stress and the dynamic disturbance amplitude, and the kinetic energy of the ejected fragments first increases and then decreases as the cyclic dynamic disturbance frequency increases. The main differences between rockbursts induced by ramp dynamic disturbances and those induced by cyclic dynamic disturbances are as follows: the rockburst development process of the former is characterized by an impact failure feature, while that of the latter is characterized by a fatigue failure feature; the damage evolution curve of the specimen of the former has a leap-developing form with a significant catastrophic feature, while that of the latter has an inverted S-shape with a remarkable fatigue damage characteristic; the energy mechanism of the former involves the ramp dynamic disturbance giving extra elastic strain energy to rocks, while that of the latter involves the cyclic dynamic disturbance decreasing the ultimate energy storage capacity of rocks.

  9. Effects of Booster Scraping in Polarized Proton Runs 2006 and 2008

    Energy Technology Data Exchange (ETDEWEB)

    Zhang,S.Y.; Ahrens, L.; Huang, H.; Zeno, K.

    2009-01-02

    Effects of the Booster vertical scraping on the RHIC beam polarization, the RHIC beam emittance, and on the Booster to AGS transfer efficiency and AGS transmission as well, are further studied. In [1], the strong dependence of the RHIC beam polarization and emittance on bunch intensity in proton run 2008 (pp08) is compared with the proton run 2006 (pp06), where the dependence is much weaker. The setting in the AGS Booster, mainly the vertical scraping, is suspected to having played a role in the different patterns in the two runs. In this note, we further study the effects of the Booster vertical scraping on the RHIC beam polarization, and on the RHIC beam emittance as well. With the improvement of the RHIC bunch intensity in mind, the Booster scraping effects on the Booster to AGS transfer (BtA) efficiency and the AGS transmission are also studied. For simplicity and to be more useful, only the RHIC fills after the one-week shutdown in pp06 and the fills using the AGS User 2 in pp08 are shown. For these fills, the machine settings in AGS are similar in pp06 and pp08 runs. Furthermore, this setting might be used for next polarized proton run, at least at the beginning of the run.

  10. Promoting exercise maintenance: how interventions with booster sessions improve long-term rehabilitation outcomes.

    Science.gov (United States)

    Fleig, Lena; Pomp, Sarah; Schwarzer, Ralf; Lippke, Sonia

    2013-11-01

    Follow-up intervention boosters are supposed to promote exercise maintenance beyond initial treatment. The current quasi-experimental study investigated the benefits of adding telephone-delivered intervention boosters to a self-management exercise intervention for rehabilitants. Psycho-social mechanisms by which the intervention boosters promote exercise maintenance were examined. Between 2009 and 2011, individuals in cardiac and orthopedic rehabilitation (N = 1,166) were allocated to either a self-management exercise intervention or a control group (i.e., questionnaire only). In addition to standard rehabilitation, participants in the intervention group were offered a series of telephone-delivered intervention boosters after 6 weeks and again after 6 months. Self-efficacy, action planning, and satisfaction with previous exercise outcomes were reassessed 12 months after discharge. Habit strength and exercise were measured 18 months after rehabilitation. The intervention with boosters promoted the maintenance of planning, self-efficacy, satisfaction, exercise, and habit strength. Changes in exercise were simultaneously mediated by changes in planning, self-efficacy, and satisfaction. Changes in habit strength were sequentially mediated by planning and exercise. Interventions with boosters that focus on action planning, self-efficacy, and satisfaction help to maintain self-directed postrehabilitation exercise. Frequent exercise performance, in turn, can strengthen exercise habits. PsycINFO Database Record (c) 2013 APA, all rights reserved.

  11. The Booster Break program: description and feasibility test of a worksite physical activity daily practice.

    Science.gov (United States)

    Taylor, Wendell C; Shegog, Ross; Chen, Vincent; Rempel, David M; Baun, MaryBeth Pappas; Bush, Cresendo L; Green, Tomas; Hare-Everline, Nicole

    2010-01-01

    Work breaks are underutilized opportunities to promote health. The Booster Break program is a co-worker led physical activity group session devoted exclusively to standard 15-minute work breaks. The purpose of this study was to report the fidelity, attendance, feasibility, and sustainability of the Booster Break program and to explore its potential impact. The study site was a small business that provides legal and court reporting services to lawyers. The company's services include legal videography, litigation, records retrieval, and videoconferencing to civil attorneys. Established in 1973, the organization has 14 employees (8 women and 6 men), from 32 to 66 years of age. For six months, this small business implemented the Booster Break program. Booster Break facilitators conducted the group sessions according to protocol, which included describing, cueing, and executing the physical activity sequence. During the six month period, 117 sessions were conducted. The average monthly attendance ranged from 76% to 86%. Participants significantly improved HDL cholesterol (p=0.04) and lost an average of 14 pounds. The Booster Break program is a feasible physical activity program for small business settings. The implications of the Booster Break program for future research in worksite settings are discussed.

  12. Effects of hepatitis B vaccine boosters on anti-HBs-negative children after primary immunization.

    Science.gov (United States)

    Lu, Shunshun; Ren, Jingjing; Li, Qian; Jiang, Zhenggang; Chen, Yongdi; Xu, Kaijin; Ruan, Bing; Yang, Shigui; Xie, Tiansheng; Yang, Linna; Li, Jing; Yao, Jun

    2017-04-03

    This study was aimed at evaluating the changes of hepatitis B surface antibody (anti-HBs) titer after booster vaccinations in 5-15-year-old children with negative antibodies (vaccination during infancy. The participants were divided into 3 groups according to their pre-booster anti-HBs level: Group I, vaccination (0-1-6 month, 20 µg), and changes in the levels of antibodies were examined at 4 time-points (one month after the first and the third dose, one year and 5 years after the third dose). The seroprotective rate (defined as anti-HBs ≥10.0 mIU/mL) among 225 subjects at the 4 time-points were 93.8%, 100%, 83.6% and 73.4%, respectively (χ 2 = 90.29, p anti-HBs geometric mean titer (GMT) in Group III were always higher than those in the other 2 groups (all p effect of a 3 -dose booster revaccination is good, and the booster-induced immune response was correlated with the pre-booster titer level, and ≥1.0 mIU/mL ensuring a robust positive response, whereas titers below this value may indicate the need for a course of booster vaccination.

  13. Pemodelan Dan Simulasi PV-Inverter Terintegrasi Ke Grid Dengan Kontrol Arus “Ramp Comparison Of Current Control”

    Directory of Open Access Journals (Sweden)

    Hazlif Nazif

    2015-09-01

    Full Text Available In this study, the operation of the ramp comparison current control is analyzed and simulated on a grid connected inverter used in a photovoltaic power plant. The model of the photovoltaic power plant is built using MATLAB / SIMULINK. Performance of the hardware are evaluated and analyzed by comparing the simulation and the theoretical results due to input parameter of the photovoltaic plant, i.e. temperature and irradiation. Simulations results showed the similarity with the theoretical results. Performances of the current control were evaluated by varying the amplitude and frequency of triangle wave as the modulation signal. For each frequency and the amplitude, the quality of the output current is analyzed by reviewing the generated current distortion. Simulation shows that for the triangle wave frequency of 1250 Hz, it was produced the current THD of 7.25%, while for the frequency 4950 Hertz, current THD obtained was 4.10%. These values indicate that the larger the triangle wave frequency was applied , the better the quality of the resulting current (low distortion. While, the effect of the triangle wave amplitude indicates that the higher the triangle wave’s amplitude, the poorer the quality of output currents would be obtained, for an amplitude of 15 Volts and frequency of 4950 Hz, the generated THD current was 4.10%, while for the amplitude of 20 Volts, the generated THD current was 4.31%.

  14. Types and characteristics of ramp-related motor vehicle crashes on urban interstate roadways in Northern Virginia.

    Science.gov (United States)

    McCartt, Anne T; Northrup, Veronika Shabanova; Retting, Richard A

    2004-01-01

    Freeway entrance and exit ramp interchanges are the sites of far more crashes per mile driven than other segments of interstate highways, but the characteristics and circumstances of ramp crashes have been the subject of relatively little recent research. This study examined a sample of 1,150 crashes that occurred on heavily traveled urban interstate ramps in Northern Virginia. Based on a review of diagrams and narrative descriptions from police crash reports, the most common crash types were identified and examined for different roadway locations and ramp designs and by whether at-fault drivers were entering or exiting the freeway. About half of all crashes occurred when at-fault drivers were in the process of exiting interstates, 36% occurred when drivers were entering, and 16% occurred at the midpoints of access roads or on ramps connecting two interstate freeways. Three major crash types--run-off-road, rear-end, and sideswipe/cutoff--accounted for 95% of crashes in the study. The crash type most frequently associated with exiting was run-off-road, and the types most common with entering drivers were rear-end or sideswipe/cutoff. Crashes most common on ramps--run-off-road crashes--frequently occurred when vehicles were exiting interstates at night, in bad weather, or on curved portions of ramps. Speed was often a factor. Crashes occurring on ramp margins (where ramps or access roads enter or exit) were most commonly of the sideswipe/cutoff type. These often involved at-fault passenger vehicles merging from entrance ramps into the sides of large trucks already on the freeway. The predominant crash type on access roads was rear-end crashes; congestion was a factor in these crashes. Alcohol was a reported factor in a sizeable proportion of run-off-road crashes occurring on ramps (14%) and ramp margins (30%). Candidate countermeasures for run-off-road crashes include geometric design changes to increase ramp design speed such as increasing curve radii. Speed

  15. Wind power variability and power system reserves in South Africa

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Litong-Palima, Marisciel; Hahmann, Andrea N.

    2017-01-01

    Variable renewable generation, primarily from wind and solar, introduces new uncertainties in the operation of power systems. This paper describes and applies a method to quantify how wind power development will affect the use of short-term automatic reserves in the future South African power...... system. The study uses a scenario for wind power development in South Africa, based on information from the South African transmission system operator (Eskom) and the Department of Energy. The scenario foresees 5% wind power penetration by 2025. Time series for wind power production and forecasts...... are simulated, and the duration curves for wind power ramp rates and wind power forecast errors are applied to assess the use of reserves due to wind power variability. The main finding is that the 5% wind power penetration in 2025 will increase the use of short-term automatic reserves by approximately 2%....

  16. Controlled release of 1-methylcyclopropene from its functionalised electrospun fibres under constant and linearly ramped humidity.

    Science.gov (United States)

    Neoh, Tze Loon; Ariyanto, Hermawan Dwi; Menéndez Galvan, Patricia; Yoshii, Hidefumi

    2017-10-01

    The methodology to electrospin polystyrene (PS) fibres functionalised with the inclusion complex between 1-methylcyclopropene (1-MCP) and α-cyclodextrin (α-CD) has been developed successfully. Due to limited availability, α-CD crystals instead of 1-MCP/α-CD complex were suspended in the electrospinning (ES) solutions to investigate the ES process. The ES solutions were characterised in terms of viscosity, conductivity and surface tension. Meanwhile, the fibres were subjected to scanning electron microscopy. The average fibre diameter was proportional to approximately one-sixth power of the capillary number of the ES solution. Viscosity, which was a function of PS concentration and α-CD loading, was the main property that dictated the spin ability of the ES solutions. ES fibres with 1.5-4.4 μm in diameter were produced with 12.5-20.0% (w/w) PS in ES solution and an equal amount of the inclusion complex for PS. In the case of the ES solutions of 20 wt% PS loaded with the inclusion complex from 0 to 100% (w/w) to PS, all the ES solutions were electrospinnable with the average diameter ranging from 3.8 to 4.6 μm. X-ray diffractometry indicated that the α-CD crystals were homogeneously suspended on the fibre mats. Confocal laser scanning microscopy showed that the crystals were suspended on the fibre mats while being coated with a layer of PS. The complex-functionalised fibre was formed from the ES solution of 20% PS and 50% (w/w) inclusion complex with the ES. The release characteristics of 1-methylcyclopropene (1-MCP) from the functionalised fibre and the inclusion complex were investigated real time under linearly ramping humidity conditions at constant temperatures with a home-built humidity regulating system coupled with gas chromatography. The irregular release profiles were successfully modelled and the activation energies of release for the functionalised fibre and inclusion complex were about 128 and 69 kJ/mol, respectively..

  17. X-2 on ramp with B-50 mothership and support crew

    Science.gov (United States)

    1956-01-01

    Air Force test pilot Capt. Iven Kincheloe stands in front of the Bell X-2 (46-674) on the ramp at Edwards Air Force Base, California. Behind the X-2 are ground support personnel, the B-50 launch aircraft and crew, chase planes, and support vehicles. Kincheloe had flown nearly 100 combat missions in Korea in an F-86 and was credited with shooting down 10 enemy aircraft. He then graduated from the Empire Test Pilot's School in Great Britain in December 1954, whereupon he was assigned to Edwards Air Force Base. He made four powered flights in the X-2. On September 7, 1956, he reached an altitude of 126,200 feet. After the death of Capt. Mel Apt and the loss of the X-2 #1 on September 27, 1956, in the first Mach 3 flight, Kincheloe was assigned as the Air Force project pilot for the X-15. Before he had a chance to fly that rocket-powered aircraft, Kincheloe himself lost his life on July 26, 1958, in an F-104 accident. The X-2 was a swept-wing, rocket-powered aircraft designed to fly faster than Mach 3 (three times the speed of sound). It was built for the U.S. Air Force by the Bell Aircraft Company, Buffalo, New York. The X-2 was flown to investigate the problems of aerodynamic heating as well as stability and control effectiveness at high altitudes and high speeds (in excess of Mach 3). Bell aircraft built two X-2 aircraft. These were constructed of K-monel (a copper and nickel alloy) for the fuselage and stainless steel for the swept wings and control surfaces. The aircraft had ejectable nose capsules instead of ejection seats because the development of ejection seats had not reached maturity at the time the X-2 was conceived. The X-2 ejection canopy was successfully tested using a German V-2 rocket. The X-2 used a skid-type landing gear to make room for more fuel. The airplane was air launched from a modified Boeing B-50 Superfortress Bomber. X-2 Number 1 made its first unpowered glide flight on Aug. 5, 1954, and made a total of 17 (4 glide and 13 powered) flights

  18. Modelling the Ohmic L-mode ramp-down phase of JET hybrid pulses using JETTO with Bohm-gyro-Bohm transport

    Science.gov (United States)

    Bizarro, João P. S.; Köchl, Florian; Voitsekhovitch, Irina; EFDA Contributors, JET

    2016-11-01

    The empirical Bohm-gyro-Bohm (BgB) transport model implemented in the JETTO code is used to predictively simulate the purely Ohmic (OH), L-mode current-ramp-down phase of three JET hybrid pulses, which combine two different ramp rates with two different electron densities (at the beginning of the ramp). The modelling is discussed, namely the strategy to reduce as much as possible the number of free parameters used to benchmark the model predictions against the experimental results. Hence, keeping the gas puffing rate as measured whilst controlling the line-averaged electron density via the recycling coefficient (which in the modelling is taken at the separatrix instead of the wall), one of the many possible ways to fix the total particle source, it is shown that the BgB model reproduces well the experimental data, as far as both average quantities (plasma internal inductance and volume-averaged electron temperature) and profiles (electron density and temperature) are concerned, with relative errors remaining mostly below 20 % . The sensitivenesses with respect to the recycling coefficient, the ion effective charge, the energy of neutrals entering the plasma through the separatrix and the need to introduce a particle pinch are assessed; the necessity for a proper sawtooth model if experimental results are to be reproduced is also shown. The strong non-linear coupling in a OH plasma between density, temperature and current (essentially via interplay between the power-balance equation, Joule’s heating with a temperature-dependent resistivity and the dependence of BgB transport coefficients on profile gradients) is put in evidence and analyzed in light of modelling results. It is still inferred from the modelling that the real value of the recycling coefficient at the separatrix (basically, the so-called fuelling efficiency times the actual recycling coefficient at the wall) must become close to one in the final stages of the discharges, when the gas puffing is

  19. What predicts postpartum pertussis booster vaccination? A controlled intervention trial.

    Science.gov (United States)

    Hayles, Elizabeth Helen; Cooper, Spring Chenoa; Wood, Nicholas; Sinn, John; Skinner, S Rachel

    2015-01-01

    'Cocooning' aims to protect susceptible infants from pertussis via caregiver vaccination. Control trials evaluating educational interventions to promote cocooning are lacking. We evaluated the role of message-framing vs. standard health information in promoting pertussis vaccination. We recruited postpartum women from a maternity hospital in Sydney, Australia (November 2010-July 2012). Participants self-completed a pertussis knowledge and attitudes questionnaire. We then assigned pertussis-susceptible (no pertussis vaccine ≤10 years) participants to receive a gain-framed, loss-framed pamphlet or control (Government Pertussis factsheet) using weekly sequential block allocation. Next, participants were offered a pertussis vaccine (dTpa) and completed a post-questionnaire on discharge. A baseline questionnaire was completed for 96.4% (1433/1486) of postpartum women approached. Missing data was excluded (n=29). Next, participants (1404) were screened for vaccine status: 324 (23%) reported prior pertussis booster vaccine receipt, leaving 1080 participants requiring vaccination. Among susceptible mothers, 70% (754/1080) were vaccinated post-intervention. Rates were similar between 'gain', 'loss' or 'control' pamphlets (69.1% vs. 71.8% vs. 68.8%; p=0.62). Intention to be vaccinated (OR 2.46, pvaccine benefits (OR: 1.61, pvaccine recommendation (OR 1.68; p=0.025; 95% CI: 1.07-2.65) were independent predictors of vaccine uptake. At discharge, overall pertussis vaccine coverage had increased from 23% to 77% among women screened (1078/1404). A cocooning strategy for pertussis vaccination can be highly effective when partially implemented within maternity hospitals, with information accompanied by a funded vaccine. Mothers were highly receptive to vaccination in the postnatal ward: facts about pertussis were as effective as message-framing in promoting a high uptake of 70%. Perceived vaccine benefits, intentions and vaccine recommendation were important predictors of uptake

  20. Hyporesponsiveness following booster immunization with bacterial polysaccharides is caused by apoptosis of memory B cells.

    Science.gov (United States)

    Brynjolfsson, Siggeir F; Henneken, Maren; Bjarnarson, Stefania P; Mori, Elena; Del Giudice, Giuseppe; Jonsdottir, Ingileif

    2012-02-01

    Repeated immunizations with polysaccharide (PS) vaccines cause hyporesponsiveness through undefined mechanisms. We assessed the effects of a PS booster on immune responses, frequency, and survival of PS-specific B-cell subpopulations in spleen and bone marrow. Neonatal mice were primed with meningococcus serotype C (MenC) conjugate MenC-CRM(197)+CpG1826, boosted with MenC-CRM(197), MenC-PS, or saline; subsequently, bromodeoxyuridine (BrdU) was injected daily intraperitoneally. MenC-PS-specific cells were labeled with fluorescent MenC-PS and phenotyped by flow cytometry. After MenC-PS booster, proliferating (BrdU(+)) MenC-PS-specific naive B cells (CD138(-)/B220(+); P = .0003) and plasma cells (CD138(+)/B220(-); P = .0002) in spleen were fewer than after saline booster. BrdU(+) MenC-PS-specific plasma cells were also reduced in bone marrow (P = .0308). Compared to saline, MenC-PS booster reduced BrdU(+) IgG(+) MenC-PS-specific B cells in spleen (P = .0002). Twelve hours after the MenC-PS booster, an increased frequency of apoptotic (AnnexinV(+)) MenC-PS-specific B cells in spleen was observed compared with MenC-CRM(197) (P = .0286) or saline (P = .001) boosters. We demonstrated that the MenC-PS booster significantly reduced the frequency of newly activated MenC-PS-specific B cells-mostly switched IgG(+) memory cells-by driving them into apoptosis. It shows directly that apoptosis of PS-specific memory cells is the cause of PS-induced hyporesponsiveness. These results should be taken into account prior to consideration of the use of PS vaccines.

  1. Space Transportation Booster Engine Configuration Study. Volume 3: Program Cost estimates and work breakdown structure and WBS dictionary

    Science.gov (United States)

    1989-01-01

    The objective of the Space Transportation Booster Engine Configuration Study is to contribute to the ALS development effort by providing highly reliable, low cost booster engine concepts for both expendable and reusable rocket engines. The objectives of the Space Transportation Booster Engine (STBE) Configuration Study were: (1) to identify engine development configurations which enhance vehicle performance and provide operational flexibility at low cost; and (2) to explore innovative approaches to the follow-on Full-Scale Development (FSD) phase for the STBE.

  2. MD-11 PCA - View of aircraft on ramp

    Science.gov (United States)

    1995-01-01

    This McDonnell Douglas MD-11 is taxiing to a position on the flightline at NASA's Dryden Flight Research Center, Edwards, California, following its completion of the first and second landings ever performed by a transport aircraft under engine power only (on Aug. 29, 1995). The milestone flight, with NASA research pilot and former astronaut Gordon Fullerton at the controls, was part of a NASA project to develop a computer-assisted engine control system that enables a pilot to land a plane safely when its normal control surfaces are disabled. The Propulsion-Controlled Aircraft (PCA) system uses standard autopilot controls already present in the cockpit, together with the new programming in the aircraft's flight control computers. The PCA concept is simple. For pitch control, the program increases thrust to climb and reduces thrust to descend. To turn right, the autopilot increases the left engine thrust while decreasing the right engine thrust. The initial Propulsion-Controlled Aircraft studies by NASA were carried out at Dryden with a modified twin-engine F-15 research aircraft.

  3. MD-11 PCA - Closeup view of aircraft on ramp

    Science.gov (United States)

    1995-01-01

    This McDonnell Douglas MD-11 has taxied to a position on the flightline at NASA's Dryden Flight Research Center, Edwards, California, following its completion of the first and second landings ever performed by a transport aircraft under engine power only (on Aug. 29, 1995). The milestone flight, with NASA research pilot and former astronaut Gordon Fullerton at the controls, was part of a NASA project to develop a computer-assisted engine control system that enables a pilot to land a plane safely when its normal control surfaces are disabled. The Propulsion-Controlled Aircraft (PCA) system uses standard autopilot controls already present in the cockpit, together with the new programming in the aircraft's flight control computers. The PCA concept is simple. For pitch control, the program increases thrust to climb and reduces thrust to descend. To turn right, the autopilot increases the left engine thrust while decreasing the right engine thrust. The initial Propulsion-Controlled Aircraft studies by NASA were carried out at Dryden with a modified twin-engine F-15 research aircraft.

  4. 47 CFR 74.707 - Low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.707 Low power TV and TV translator station protection. (a)(1) A low power TV or TV translator will be protected from interference from other...

  5. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  6. 47 CFR 74.795 - Digital low power TV and TV translator transmission system facilities.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator... DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.795 Digital low power TV and TV translator transmission system facilities. (a) A digital low power TV or TV translator station shall operate...

  7. 47 CFR 74.710 - Digital low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.710 Digital low power TV and TV translator station protection. (a) An application to construct a new low power TV, TV translator, or TV...

  8. 47 CFR 74.792 - Digital low power TV and TV translator station protected contour.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.792 Digital low power TV and TV translator station protected contour. (a) A digital low power TV or TV translator will be protected from...

  9. Numerical Study of Control of Flow Separation Over a Ramp with Nanosecond Plasma Actuator

    Science.gov (United States)

    Zheng, J. G.; Khoo, B. C.; Cui, Y. D.; Zhao, Z. J.; Li, J.

    2016-06-01

    The nanosecond plasma discharge actuator driven by high voltage pulse with typical rise and decay time of several to tens of nanoseconds is emerging as a promising active flow control means in recent years and is being studied intensively. The characterization study reveals that the discharge induced shock wave propagates through ambient air and introduces highly transient perturbation to the flow. On the other hand, the residual heat remaining in the discharge volume may trigger the instability of external flow. In this study, this type of actuator is used to suppress flow separation over a ramp model. Numerical simulation is carried out to investigate the interaction of the discharge induced disturbance with the external flow. It is found that the flow separation region over the ramp can be reduced significantly. Our work may provide some insights into the understanding of the control mechanism of nanosecond pulse actuator.

  10. The Tool Life of Ball Nose end Mill Depending on the Different Types of Ramping

    Directory of Open Access Journals (Sweden)

    Vopát Tomáš

    2014-12-01

    Full Text Available The article deals with the cutting tool wear measurement process and tool life of ball nose end mill depending on upward ramping and downward ramping. The aim was to determine and compare the wear (tool life of ball nose end mill for different types of copy milling operations, as well as to specify particular steps of the measurement process. In addition, we examined and observed cutter contact areas of ball nose end mill with machined material. For tool life test, DMG DMU 85 monoBLOCK 5-axis CNC milling machine was used. In the experiment, cutting speed, feed rate, axial depth of cut and radial depth of cut were not changed. The cutting tool wear was measured on Zoller Genius 3s universal measuring machine. The results show different tool life of ball nose end mills depending on the copy milling strategy.

  11. Investigation of ramped voltage stress to screen defective magnetic tunnel junctions

    Science.gov (United States)

    Choi, Chulmin; Sukegawa, Hiroaki; Mitani, Seiji; Song, Yunheub

    2018-01-01

    A ramped voltage stress (RVS) method to screen defective magnetic tunnel junctions (MTJs) is investigated in order to improve screen accuracy and shorten test time. Approximately 1500 MTJs with 1.25 nm thick tunnel barriers were fabricated for this evaluation, and normal MTJs show a 189% tunnel magnetoresistance ratio, a 365 Ω μm2 resistance-area product, and a 1.8 V breakdown voltage, which is enough for applying reliable screen tests. We successfully classified MTJs as normal MTJs having good characteristics or defective MTJs having insufficient endurance and showing resistance degradation after only short-term cycling. Using the RVS screen test with low ramp speed, it is demonstrated that remarkable screening performance and little dependence on temperature are obtained for short test time.

  12. Performance evaluation of booster materials in the plastic bonded explosive PBX 9502 in a hemispherical wave breakout test

    Energy Technology Data Exchange (ETDEWEB)

    Hooks, Daniel E [Los Alamos National Laboratory; Morris, John S [Los Alamos National Laboratory; Hill, Larry G [Los Alamos National Laboratory; Francois, Elizabeth [Los Alamos National Laboratory

    2008-01-01

    An explosive booster is normally required to initiate detonation in an insensitive high explosive (lHE). Booster materials must be ignitable by a conventional detonator and deliver sufficient energy and favorable pulse shape to initiate the IHE charge. The explosive booster should be as insensitive as reasonably possible to maintain the overall safety margin of the explosive assembly. A hemispherical wave breakout test termed the on ionskin test is one of the methods of testing the performance of booster materials in an initiation train assembly. There are several variations of this basic test which are known by other names. In this test, the wave breakout time-position history at the surface of a hemispherical IHE acceptor charge is recorded, and the relative uniformity of breakout allows qualitative comparison between booster candidates and quantitative comparison of several metrics. The results of a series of onionskin experiments evaluating the performance of some new booster formulations in the triaminotrinitrobenzene (TA TB) -based plastic bonded explosive PBX 9502 will be presented. The boosters were tested in an onionskin arrangement in which the booster pellet was cylindrical, and the tests were performed at a temperature of-55{sup o}C to emphasize variations in spreading performance. The modification from the traditional hemispherical geometry facilitated efficient explosive fabrication and charge assembly, but the results indicate that this geometry was not ideal for several reasons. Despite the complications arising from geometry, promising performance was observed from booster formulations including 3,3' -diamino-4,4'azoxyfurazan.

  13. Perseus High Altitude Remotely Piloted Aircraft on Ramp

    Science.gov (United States)

    1991-01-01

    The Perseus proof-of-concept vehicle waits on Rogers Dry Lake in the pre-dawn darkness before a test flight at the Dryden Flight Research Center, Edwards, California. Perseus B is a remotely piloted aircraft developed as a design-performance testbed under NASA's Environmental Research Aircraft and Sensor Technology (ERAST) project. Perseus is one of several flight vehicles involved in the ERAST project. A piston engine, propeller-powered aircraft, Perseus was designed and built by Aurora Flight Sciences Corporation, Manassas, Virginia. The objectives of Perseus B's ERAST flight tests have been to reach and maintain horizontal flight above altitudes of 60,000 feet and demonstrate the capability to fly missions lasting from 8 to 24 hours, depending on payload and altitude requirements. The Perseus B aircraft established an unofficial altitude record for a single-engine, propeller-driven, remotely piloted aircraft on June 27, 1998. It reached an altitude of 60,280 feet. In 1999, several modifications were made to the Perseus aircraft including engine, avionics, and flight-control-system improvements. These improvements were evaluated in a series of operational readiness and test missions at the Dryden Flight Research Center, Edwards, California. Perseus is a high-wing monoplane with a conventional tail design. Its narrow, straight, high-aspect-ratio wing is mounted atop the fuselage. The aircraft is pusher-designed with the propeller mounted in the rear. This design allows for interchangeable scientific-instrument payloads to be placed in the forward fuselage. The design also allows for unobstructed airflow to the sensors and other devices mounted in the payload compartment. The Perseus B that underwent test and development in 1999 was the third generation of the Perseus design, which began with the Perseus Proof-Of-Concept aircraft. Perseus was initially developed as part of NASA's Small High-Altitude Science Aircraft (SHASA) program, which later evolved into the

  14. Heart Rate Variability as a Measure of Airport Ramp-Traffic Controllers Workload

    Science.gov (United States)

    Hayashi, Miwa; Dulchinos, Victoria Lee

    2016-01-01

    Heart Rate Variability (HRV) has been reported to reflect the person's cognitive and emotional stress levels, and may offer an objective measure of human-operator's workload levels, which are recorded continuously and unobtrusively to the task performance. The present paper compares the HRV data collected during a human-in-the-loop simulation of airport ramp-traffic control operations with the controller participants' own verbal self-reporting ratings of their workload.

  15. Arthroscopic all-inside ramp lesion repair using the posterolateral transseptal portal view.

    Science.gov (United States)

    Keyhani, Sohrab; Ahn, Jin Hwan; Verdonk, René; Soleymanha, Mehran; Abbasian, Mohammadreza

    2017-02-01

    The purpose of this study was to evaluate and describe the clinical results and outcomes of a novel method for all-inside suture repair of medial meniscus ramp lesions through posteromedial and posterolateral transseptal portals during anterior cruciate ligament (ACL) reconstruction. Further, this investigation compared the posterolateral view to the notch view for diagnosis and repair. Between 2011 and 2014, 166 patients had ramp lesions concomitantly with ACL injury; 128 patients (107 men and 21 women) were enrolled in the study after qualification. All patients underwent repair of the posterior horn ramp lesion of the medial meniscus, using a suture hook device with PDS No. 1 through a posteromedial portal while viewing from the posterolateral transseptal portal during ACL reconstruction, with a minimum of a 2-year follow-up. Patients were followed up for a minimum of 2 years (range 24-47 months). Their average Lysholm score increased from 61.7 ± 3.2 preoperatively to 87.8 ± 3.9 at last follow-up (p < 0.001). Moreover, their average IKDC scores also improved from 53.6 ± 2.1 (pre-op) to 82.1 ± 3.5 (at last follow-up) (p < 0.001). The peroneal nerve and the popliteal neurovascular bundle were not damaged in any of the patients. This study provides evidence that the posterolateral transseptal technique protects neurovascular structures. This technique may be used safely and easily for repair of the posterior horn ramp lesion of the medial meniscus during ACL reconstruction. IV.

  16. Seat belt misuse among children transported in belt-positioning booster seats.

    Science.gov (United States)

    O'Neil, Joseph; Daniels, Dawn M; Talty, Judith L; Bull, Marilyn J

    2009-05-01

    Observe and report seat belt use among children transported in belt-positioning booster seats. We conducted a cross-sectional, observational survey of children transported in motor vehicles between 2006 and 2007. While drivers completed a survey reporting the child's age, weight and gender, and the driver's age, gender, race, income, education, and relationship to the child; a child passenger safety technician recorded vehicle seating location, restraint type, and use of the car safety seat harness or seat belt as appropriate for the child. Twenty-five fast food restaurants and discount department stores throughout Indiana. A convenience sample of drivers transporting children younger than 16 years. Seat belt use among children transported in belt-positioning booster seats. Seat belt misuse. Overall, 1446 drivers participated, 2287 children were observed with 564 children in belt-positioning booster seats. At least one seat belt misuse was observed for 64.8% of the children transported. Common misuses were the shoulder belt being placed over the booster seat armrest (35.8%); shoulder belt not at mid-shoulder position (28.5%), seat belt was too loose (24.5%), and the shoulder belt was either behind the child's back (9.1%) or under their arm (10.0%). There is a high frequency of seat belt misuses among children transported in booster seats. Advice to parents on appropriate car seat selection, and encouragement to parents to supervise seat belt use may decrease misuse.

  17. Midwife attitudes: an important determinant of maternal postpartum pertussis booster vaccination.

    Science.gov (United States)

    Robbins, Spring Chenoa Cooper; Leask, Julie; Hayles, Elizabeth Helen; Sinn, John K H

    2011-08-05

    The study was designed to determine the feasibility of implementing routine dTpa vaccination in the maternity ward to new mothers and to assess midwives' attitudes toward pertussis booster vaccination, their perceived susceptibility and severity of pertussis in their patients' communities, the perceived barriers and benefits of their patients' vaccinations, and their cues to action and self-efficacy in delivering the vaccine. A self-completed questionnaire was developed to evaluate constructs of the Health Belief Model as well as to measure midwife demographic information. Questionnaires were completed by midwives during in-services at both a public hospital and a private hospital in New South Wales, Australia. Midwives who perceived ease in integrating booster vaccination into their workload were more likely to have high self-efficacy in delivering booster vaccination, measured through perceived importance of the role as part of their job (r = .449, pvaccination as part of their role (r = .608, pvaccination (r = .528, ppertussis booster vaccination to mothers was their own perceived self-efficacy of providing the vaccination. To increase midwives' desire and confidence to provide pertussis booster to mothers, educational materials and skills workshops could be offered. Copyright © 2011 Elsevier Ltd. All rights reserved.

  18. Space Launch System Booster Separation Aerodynamic Database Development and Uncertainty Quantification

    Science.gov (United States)

    Chan, David T.; Pinier, Jeremy T.; Wilcox, Floyd J., Jr.; Dalle, Derek J.; Rogers, Stuart E.; Gomez, Reynaldo J.

    2016-01-01

    The development of the aerodynamic database for the Space Launch System (SLS) booster separation environment has presented many challenges because of the complex physics of the ow around three independent bodies due to proximity e ects and jet inter- actions from the booster separation motors and the core stage engines. This aerodynamic environment is dicult to simulate in a wind tunnel experiment and also dicult to simu- late with computational uid dynamics. The database is further complicated by the high dimensionality of the independent variable space, which includes the orientation of the core stage, the relative positions and orientations of the solid rocket boosters, and the thrust lev- els of the various engines. Moreover, the clearance between the core stage and the boosters during the separation event is sensitive to the aerodynamic uncertainties of the database. This paper will present the development process for Version 3 of the SLS booster separa- tion aerodynamic database and the statistics-based uncertainty quanti cation process for the database.

  19. Human subjects’ perception of indoor environment and their office work performance during exposures to moderate operative temperature ramps

    DEFF Research Database (Denmark)

    Kolarik, Jakub; Toftum, Jørn; Olesen, Bjarne W.

    2008-01-01

    sensation was also included. Subjects filled out questionnaires regarding perception of the environment and intensity of SBS symptoms. Subjects performed simulated office tasks (addition, text typing, proof reading, comprehension and reasoning). Results showed that all tested ramps were recognized...

  20. Fully non-inductive second harmonic electron cyclotron plasma ramp-up in the QUEST spherical tokamak

    Science.gov (United States)

    Idei, H.; Kariya, T.; Imai, T.; Mishra, K.; Onchi, T.; Watanabe, O.; Zushi, H.; Hanada, K.; Qian, J.; Ejiri, A.; Alam, M. M.; Nakamura, K.; Fujisawa, A.; Nagashima, Y.; Hasegawa, M.; Matsuoka, K.; Fukuyama, A.; Kubo, S.; Shimozuma, T.; Yoshikawa, M.; Sakamoto, M.; Kawasaki, S.; Nakashima, H.; Higashijima, A.; Ide, S.; Maekawa, T.; Takase, Y.; Toi, K.

    2017-12-01

    Fully non-inductive second (2nd) harmonic electron cyclotron (EC) plasma current ramp-up was demonstrated with a newlly developed 28 GHz system in the QUEST spherical tokamak. A high plasma current of 54 kA was non-inductively ramped up and sustained stably for 0.9 s with a 270 kW 28 GHz wave. A higher plasma current of 66 kA was also non-inductively achieved with a slow ramp-up of the vertical field. We have achieved a significantly higher plasma current than those achieved previously with the 2nd harmonic EC waves. This fully non-inductive 2nd harmonic EC plasma ramp-up method might be useful for future burning plasma devices and fusion reactors, in particular for operations at half magnetic field with the same EC heating equipment.

  1. Incremental artificial bee colony with local search to economic dispatch problem with ramp rate limits and prohibited operating zones

    International Nuclear Information System (INIS)

    Özyön, Serdar; Aydin, Doğan

    2013-01-01

    Highlights: ► Prohibited operating zone economic dispatch problem has been solved by IABC-LS. ► The losses used in the solution of the problem have been computed by B-loss matrix. ► IABC-LS method has been applied to three test systems in literature. ► The values obtained by IABC and IABC-LS are better than the results in literature. - Abstract: In this study, prohibited operating zone economic power dispatch problem which considers ramp rate limit, has been solved by incremental artificial bee colony algorithm (IABC) and incremental artificial bee colony algorithm with local search (IABC-LS) methods. The transmission line losses used in the solution of the problem have been computed by B-loss matrix. IABC, IABC-LS methods have been applied to three different test systems in literature which consist of 6, 15 and 40 generators. The attained optimum solution values have been compared with the optimum results in literature and have been discussed.

  2. Cyclostratigraphy and chemostratigraphy of a bioclastic storm-dominated carbonate ramp (late Pliensbachian, Iberian Basin)

    Science.gov (United States)

    Val, Jorge; Bádenas, Beatriz; Aurell, Marcos; Rosales, Idoia

    2017-06-01

    Deposition of regressive successions and coeval positive trend in the oxygen stable isotope record in relatively deep marine successions of the upper Pliensbachian of western European basins have been related to a cooling interlude within the warm greenhouse conditions of the Pliensbachian. Sedimentological, cyclostratigraphic and chemostratigraphic analyses carried out in two upper Pliensbachian successions exposed in the Iberian Chain (Obón and San Pedro localities, Spain) allowed the characterization of the imprint of this cooling interlude on the relatively shallow areas of the Iberian carbonate ramp. The upper Pliensbachian succession is characterized by skeletal limestones and encompasses proximal mid-ramp to proximal outer-ramp facies, in which resedimentation and reworking by storm-induced flows controlled the accumulation of bioclastic debris. Two orders of high-frequency, metre-scale sequences have been identified: bundles of beds, and deepening-shallowing sets of bundles. According to the age calibration (previous biostratigraphic data and new strontium isotopes data) and correlation with nearby sections, these sequences are suggested as formed in tune with the short-term and long-term eccentricity Milankovitch cycles. The isotopic data from brachiopod shells and belemnite rostra indicate progressively increasing δ18O and slightly decreasing δ13C trends for the uppermost Pliensbachian Spinatum Zone, reflecting the influence of cooling conditions. However, facies analysis reflects that the expected coeval long-term regression was interrupted by a tectonically driven transgressive event in the uppermost part of the Spinatum Zone.

  3. Resident-Assisted Montessori Programming (RAMP): training persons with dementia to serve as group activity leaders.

    Science.gov (United States)

    Camp, Cameron J; Skrajner, Michael J

    2004-06-01

    The purpose of this study was to determine the effects of an activity implemented by means of Resident-Assisted Montessori Programming (RAMP). Four persons with early-stage dementia were trained to serve as leaders for a small-group activity played by nine persons with more advanced dementia. Assessments of leaders' ability to learn the procedures of leading a group, as well as their satisfaction with this role, were taken, as were measures of players' engagement and affect during standard activities programming and RAMP activities. Leaders demonstrated the potential to fill the role of group activity leader effectively, and they expressed a high level of satisfaction with this role. Players' levels of positive engagement and pleasure during the RAMP activity were higher than during standard group activities. This study suggests that to the extent that procedural learning is available to persons with early-stage dementia, especially when they are assisted with external cueing, these individuals can successfully fill the role of volunteers when working with persons with more advanced dementia. This can provide a meaningful social role for leaders and increase access to high quality activities programming for large numbers of persons with dementia. Copyright 2004 The Gerontological Society of America

  4. Influence of Rapid Thermal Ramp Rate on Phase Transformation of Titanium Silicides

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, Glenn; Hu, Yao, Zhi; Smith, Paul Martin; Tay, Sing Pin; Thakur, Randhir; Yang, Jiting

    1999-05-03

    ULSI technology requires low resistance, stable silicides formed on small geometry lines. Titanium disilicide (TiSiz), which is the most widely used silicide for ULSI applications, exists in two crystallographic phases: the high resistance, metastable C49 phase and the low resistance, stable C54 phase. The major issue with TiSiz is the increasing thermal budget required to transform the C49 phase into the low resistance C54 phase as linewiths decrease below 0.25 pm. Annealing above 900"C to obtain this transformation often results in thermal degradation, so it is desirable to reduce the transformation temperature. The transformation temperature has been shown to be a fi.mction of many factors including microstructure, grain size, and impurities. In this paper we report an investig+ion of rapid thermal silicidation of titanium films (250, 400, and 600 A) on single crystalline silicon at temperatures from 300 to 1000"C. The ramp rates for these experiments are 5, 30, 70, and 200oC/s. The transformation temperature decreases as the ramp rate increases and as the initial film thickness increases. Scanning electron microscopy (SEM) is used to analyze the resultant film microstructure. The ramp rate influence on Ti silicidation is also investigated on polycrystalline Si lines with widths ranging from 0.27 to 3.0 pm.

  5. Spatial Influence Analysis of Traffic Safety in Diverging Areas between Freeway Segments and Off Ramps

    Directory of Open Access Journals (Sweden)

    Cuiping Zhang

    2015-01-01

    Full Text Available There tend to be more crashes occurring in freeway diverging segments due to increasing traffic conflicts between diverging vehicles and nondiverging vehicles. The diverging segments have a safety impact on the precedent basic segments and the following off ramps. It is always a challenge to accurately define the safety influential area of freeway diverging segments. In previous studies, fixed buffer in size is pregiven for crash frequency analysis in diverging segments, which lacks theoretical and practical support. In this study, the safety influential area was investigated from the statistical point of view. Data from a geocoded GIS crash database for Colorado Springs metropolitan area was used; the statistically significant factors associated with crash frequency were examined for the spatial influence of freeway diverging segments. Also, the generalized linear models with negative binomial link function were applied to predict the crash frequency for freeway diverging segments and off ramps based on the influential area. The results may give some insights into the causation of crashes on diverging segments and off-ramp intersections.

  6. Intelligent Ramp Control for Incident Response Using Dyna-Q Architecture

    Directory of Open Access Journals (Sweden)

    Chao Lu

    2015-01-01

    Full Text Available Reinforcement learning (RL has shown great potential for motorway ramp control, especially under the congestion caused by incidents. However, existing applications limited to single-agent tasks and based on Q-learning have inherent drawbacks for dealing with coordinated ramp control problems. For solving these problems, a Dyna-Q based multiagent reinforcement learning (MARL system named Dyna-MARL has been developed in this paper. Dyna-Q is an extension of Q-learning, which combines model-free and model-based methods to obtain benefits from both sides. The performance of Dyna-MARL is tested in a simulated motorway segment in the UK with the real traffic data collected from AM peak hours. The test results compared with Isolated RL and noncontrolled situations show that Dyna-MARL can achieve a superior performance on improving the traffic operation with respect to increasing total throughput, reducing total travel time and CO2 emission. Moreover, with a suitable coordination strategy, Dyna-MARL can maintain a highly equitable motorway system by balancing the travel time of road users from different on-ramps.

  7. Using Ramped Pyrolysis - Gas Chromatography - Mass Spectrometry to Evaluate Petroleum Hydrocarbons Following the Deepwater Horizon Oil Spill

    Science.gov (United States)

    Evans, M.; Rosenheim, B. E.; Bacosa, H. P.; Liu, J.; Liu, Z.

    2016-02-01

    In summer of 2010, the Deepwater Horizon oil spill polluted hundreds of miles of coastline along the Gulf of Mexico. A combination of human-mediated and natural weathering processes then altered the chemical composition (i.e. toxicity) of this spilled crude oil over time and space. One of the most important, yet challenging, aspects of oil spill science is to quantify these chemical changes in natural environments. In this study, we develop ramped pyrolysis - gas chromatography - mass spectrometry (Py-GC-MS) to address this challenge. In this technique, 0.1mg of freeze-dried sample is pyrolyzed over a gradual temperature ramp (50-650°C). The eluded gas is cold-trapped over different thermal ranges (a.k.a. thermal slicing) and each range is individually analyzed via GC-MS, yielding quantifiable, compound-specific results. Py-GC-MS with thermal slicing has never been used for petroleum hydrocarbon analysis, but it has many advantages - it uses minimal sample, is time efficient and does not require sample preparation (minimizing compound loss and increasing the analytical window). During development of this method, we analyzed oiled sediments and tar collected on Grand Isle, Louisiana from 2010-2012. We quantified n-alkane (C10-C38), polycyclic aromatic hydrocarbon (PAH) and hopane content and confirmed these results with traditional solvent extraction, silica gel fractionation and mass spectrometry. Overall, we found rapid depletion of n-alkanes and PAHs (>90% depletion) in all samples within one year of Deepwater Horizon. After this, n-alkanes were almost 100% depleted by 2012, while PAH degradation continued to a maximum total degradation of 99% and 98% in sediment and tar, respectively. This not only describes the fate of petroleum compounds in salt marshes and beach deposits over time, but also complements previous radiocarbon studies of the same samples showing different rates of degradation in different micro-environments. In addition, the results presented

  8. Solid Rocket Booster Large Main and Drogue Parachute Reliability Analysis

    Science.gov (United States)

    Clifford, Courtenay B.; Hengel, John E.

    2009-01-01

    The parachutes on the Space Transportation System (STS) Solid Rocket Booster (SRB) are the means for decelerating the SRB and allowing it to impact the water at a nominal vertical velocity of 75 feet per second. Each SRB has one pilot, one drogue, and three main parachutes. About four minutes after SRB separation, the SRB nose cap is jettisoned, deploying the pilot parachute. The pilot chute then deploys the drogue parachute. The drogue chute provides initial deceleration and proper SRB orientation prior to frustum separation. At frustum separation, the drogue pulls the frustum from the SRB and allows the main parachutes that are mounted in the frustum to unpack and inflate. These chutes are retrieved, inspected, cleaned, repaired as needed, and returned to the flight inventory and reused. Over the course of the Shuttle Program, several improvements have been introduced to the SRB main parachutes. A major change was the replacement of the small (115 ft. diameter) main parachutes with the larger (136 ft. diameter) main parachutes. Other modifications were made to the main parachutes, main parachute support structure, and SRB frustum to eliminate failure mechanisms, improve damage tolerance, and improve deployment and inflation characteristics. This reliability analysis is limited to the examination of the SRB Large Main Parachute (LMP) and drogue parachute failure history to assess the reliability of these chutes. From the inventory analysis, 68 Large Main Parachutes were used in 651 deployments, and 7 chute failures occurred in the 651 deployments. Logistic regression was used to analyze the LMP failure history, and it showed that reliability growth has occurred over the period of use resulting in a current chute reliability of R = .9983. This result was then used to determine the reliability of the 3 LMPs on the SRB, when all must function. There are 29 drogue parachutes that were used in 244 deployments, and no in-flight failures have occurred. Since there are no

  9. New Approaches in Reuseable Booster System Life Cycle Cost Modeling

    Science.gov (United States)

    Zapata, Edgar

    2013-01-01

    This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model

  10. New Approaches in Reusable Booster System Life Cycle Cost Modeling

    Science.gov (United States)

    Zapata, Edgar

    2013-01-01

    This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model

  11. Timing Tasks Synchronize Cerebellar and Frontal Ramping Activity and Theta Oscillations: Implications for Cerebellar Stimulation in Diseases of Impaired Cognition

    OpenAIRE

    Parker, Krystal L.

    2016-01-01

    Timing is a fundamental and highly conserved mammalian capability, yet the underlying neural mechanisms are widely debated. Ramping activity of single neurons that gradually increase or decrease activity to encode the passage of time has been speculated to predict a behaviorally relevant temporal event. Cue-evoked low-frequency activity has also been implicated in temporal processing. Ramping activity and low-frequency oscillations occur throughout the brain and could indicate a network-based...

  12. Numerical simulation of cantilevered ramp injector flow fields for hypervelocity fuel/air mixing enhancement

    Science.gov (United States)

    Schumacher, Jurgen Christian

    Increasing demand for affordable access to space and high speed terrestrial transport has spawned research interest into various air-breathing hypersonic propulsion systems. Propulsion concepts such as the supersonic combustion ramjet (scramjet) and the shock-induced combustion ramjet (shcramjet) utilize oxygen freely available in the atmosphere and thereby substantially reduce the weight penalty of on-board oxidizer tankage used in rocket based systems. Of key importance to the ultimate success of an air-breathing concept is the ability to efficiently mix the fuel with atmospheric air. In the case of a hypersonic air-breather the challenge is accentuated due to the requirement of supersonic combustion. Flow velocities through the combustor on the order of thousands of meters per second provide the fuel and air with only a brief time to adequately combine. Contemporary mixing augmentation methods to address this issue have focused on fuel injection devices which promote axial vortices to enhance the mixing process. Much research effort has been expended on investigation of ramp injectors for this purpose. The present study introduces a new ramp injector design, based on the conventional ramp injector, dubbed the cantilevered ramp injector. A two-pronged numerical approach was employed to investigate the mixing performance and characteristics of the cantilevered injector consisting of, (1) comparison with conventional designs and (2) a parametric study of various cantilevered injector geometries. A laminar, three-dimensional, multispecies flowsolver was developed in generalized coordinates to solve the Navier-Stokes equations for the flow fields of injected H2 into high-enthalpy air. The scheme consists of an upwind TVD scheme for discretization of the convective fluxes coupled with a semi-implicit LU-SGS scheme for temporal discretization. Through analysis of the numerical solutions, it has been shown that the cantilevered ramp injector is a viable fuel injection

  13. Refine fault geometry with broadband waveform modeling for earthquake source parameters: seismological evidence for the ramp-flat-ramp geometry of the Main Himalayan Thrust

    Science.gov (United States)

    WANG, X.; Wei, S.

    2016-12-01

    The April 25th 2015 Mw7.8 Gorkha Nepal earthquake is the largest earthquake occurred on the Main Himalayan Thrust (MHT) in modern instrumental period. According to the USGS catalog, there are 31 aftershocks with mb > 5, however, only 8 of them have Global Centroid Moment Tensor (GCMT) solutions. This is mainly because the long-period signals of the aftershocks are buried in the surface wave or the coda of the previous large event. The limited number of focal mechanism and poor horizontal location and depth in the global catalog obstruct us to unambiguously image the ruptured MHT which was known mainly from geological studies. In this study, we proposed a novel method that allows us to model the teleseismic P-waves up to 1.5Hz. This method uses well-constrained medium size earthquakes to establish amplitude amplification corrections for teleseismic stations that were later used to invert the high frequency waveform of other nearby events. The new approach enables us to invert the focal mechanism of some early aftershocks, which is not possible in current global catalogs. We also conduct high frequency waveform modeling of the teleseismic depth phases that provide strong constraints on earthquake depths (uncertainty within 1-2 km). For the earthquakes with good signal to noise ratio waveform records, we performed long period waveform inversion along with bootstrapping method to estimate the uncertainty of strike, dip and rake. The horizontal locations of all these earthquakes are re-determined by teleseismic relative relocation. For the Gorhka sequence, we obtained about a dozen events more than the GCMT catalog. The refined earthquake locations delineate a ramp-flat-ramp MHT geometry that is in agreement with the structure geology, receiver functions and gravity analysis. The flat (dip 7 degree) portion of the MHT is very consistent with coseismic rupture of the mainshock which has well-constrained slip distribution. We suggest that the ramps, both along the up

  14. Synchronization of the Zero Gradient Synchrotron (ZGS) and the fast-cycling booster II injector

    International Nuclear Information System (INIS)

    Rauchas, A.V.

    1977-01-01

    The planned method of booster injection into the ZGS requires the stacking of two booster beam bunches into the radial betatron phase space of the ZGS and necessitates precise synchronization of the two accelerators during the injection period. The requirement of maintaining independent radio-frequency (rf) steering control does not allow the frequencies of both accelerators to be locked. A synchronizer was developed which detects a coincidence zero crossing of the two rf's, anticipates the next coincidence, and at that time, generates trigger pulses for the booster extraction and ZGS injection systems. It also maintains control of the sequence in which the total phase space area of the ZGS is loaded. Synchronizer accuracy is obtained by using high speed digital logic circuits. Design considerations and system operation are discussed

  15. Immune responses of bison and efficacy after booster vaccination with Brucella abortus strain RB51.

    Science.gov (United States)

    Olsen, S C; McGill, J L; Sacco, R E; Hennager, S G

    2015-04-01

    Thirty-one bison heifers were randomly assigned to receive saline or a single vaccination with 10(10) CFU of Brucella abortus strain RB51. Some vaccinated bison were randomly selected for booster vaccination with RB51 at 11 months after the initial vaccination. Mean antibody responses to RB51 were greater (P RB51-vaccinated bison at 8, 16, and 24 weeks after the initial vaccination and at 8 weeks after the booster vaccination. The vaccinated bison had greater (P Brucella organisms in all tissues, except in retropharyngeal and supramammary lymph nodes. Our study suggests that RB51 booster vaccination is an effective vaccination strategy for enhancing herd immunity against brucellosis in bison. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  16. Design of imaginary transition gamma booster synchrotron for the Jefferson Lab EIC (JLEIC)

    Energy Technology Data Exchange (ETDEWEB)

    Bogacz, Alex [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2017-05-01

    Baseline design of the JLEIC booster synchrotron is presented. Its aim is to inject and accumulate heavy ions and protons at 285 MeV, to accelerate them to about 7 GeV, and finally to extract the beam into the ion collider ring. The Figure-8 ring features two 2600 achromatic arcs configured with negative momentum compaction optics, designed to avoid transition crossing for all ion species during the course of acceleration. The lattice also features a specialized high dispersion injection insert optimized to facilitate the transverse phase-space painting in both planes for multi-turn ion injection. Furthermore, the lattice has been optimized to ease chromaticity correction with two families of sextupoles in each plane. The booster ring is configured with super-ferric, 3 Tesla bends. We are presently launching optimization of the booster synchrotron design to operate in the extreme space-charge dominated regime.

  17. Design and optimization of a large flow rate booster pump in SWRO energy recovery system

    International Nuclear Information System (INIS)

    Lai, Z N; Wu, P; Wu, D Z; Wang, L Q

    2013-01-01

    Seawater reverse osmosis (SWRO) is a high energy-consumption industry, so energy efficiency is an important issue. Energy recovery systems, which contain a pressure exchanger and a booster pump, are widely used in SWRO plants. As a key part of energy recovery system, the difficulty of designing booster pumps lies in high inlet pressure, high medium causticity and large flow rate. High inlet pressure adds difficulties to seal design, and large flow rate and high efficiency requirement bring high demand for hydraulic design. In this paper, a 625 m 3 /h booster pump is designed and optimized according to the CFD (Computational Fluid Dynamics) simulation results. The impeller and volute is well designed, a new type of high pressure mechanical seal is applied and axial force is well balanced. After optimization based on blade redesign, the efficiency of the pump was improved. The best efficiency reaches more than 85% at design point according to the CFD simulation result

  18. Design and optimization of a large flow rate booster pump in SWRO energy recovery system

    Science.gov (United States)

    Lai, Z. N.; Wu, P.; Wu, D. Z.; Wang, L. Q.

    2013-12-01

    Seawater reverse osmosis (SWRO) is a high energy-consumption industry, so energy efficiency is an important issue. Energy recovery systems, which contain a pressure exchanger and a booster pump, are widely used in SWRO plants. As a key part of energy recovery system, the difficulty of designing booster pumps lies in high inlet pressure, high medium causticity and large flow rate. High inlet pressure adds difficulties to seal design, and large flow rate and high efficiency requirement bring high demand for hydraulic design. In this paper, a 625 m3/h booster pump is designed and optimized according to the CFD (Computational Fluid Dynamics) simulation results. The impeller and volute is well designed, a new type of high pressure mechanical seal is applied and axial force is well balanced. After optimization based on blade redesign, the efficiency of the pump was improved. The best efficiency reaches more than 85% at design point according to the CFD simulation result.

  19. DAST Mated to B-52 on Ramp - Close-up

    Science.gov (United States)

    1979-01-01

    a specially equipped Air Force helicopter recovered the drone in mid-air. On the ground, a pilot controlled the DAST vehicle from a remote cockpit while researchers in another room monitored flight data transmitted via telemetry. They made decisions on the conduct of the flight while the DAST was in the air. In case of failure in any of the ground systems, the DAST vehicle could also be flown to a recovery site using a backup control system in the F-104. The DAST Program experienced numerous problems. Only eighteen flights were achieved, eight of them captive (in which the aircraft flew only while still attached to the launch aircraft). Four of the flights were aborted and two resulted in crashes--one on June 12, 1980, and the second on June 1, 1983. Meanwhile, flight experiments with higher profiles, better funded remotely piloted research vehicles took priority over DAST missions. After the 1983 crash, which was caused by a malfunction that disconnected the landing parachute from the drone, the program was disbanded. Because DAST drones were considered expendable, certain losses were anticipated. Managers and researchers involved in other high-risk flight projects gained insights from the DAST program that could be applied to their own flight research programs. The DAST aircraft had a wingspan of 14 feet, four inches and a nose-to-tail length of 28 feet, 4 inches. The fuselage had a radius of about 2.07 feet. The aircraft's maximum loaded weight was about 2,200 pounds. It derived its power from a Continental YJ69-T-406 engine.

  20. Grid Support in Large Scale PV Power Plants using Active Power Reserves

    DEFF Research Database (Denmark)

    Craciun, Bogdan-Ionut

    Photovoltaic (PV) systems are in the 3rd place in the renewable energy market, after hydro and wind power. The increased penetration of PV within the electrical power system has led to stability issues of the entire grid in terms of its reliability, availability and security of the supply...... (ENTSO-E) to continuously upgrade their Network Codes (NCs), moving their focus to grid stabilization features. Considering the technical challenges present in the nowadays power systems, the work presented in this thesis focuses on frequency and power ramp control strategies provided by LPVPPs...... method targets the limitation of power fluctuation directly at the production site and, consequently, reduces the ramping stress of the participating plants. The aforementioned ancillary services rely on the use of APRs, a crucial element in their security of the supply. The thesis examines the use...