WorldWideScience

Sample records for booster ramping power

  1. Performance of the ramping power supplies for the APS booster synchrotron

    International Nuclear Information System (INIS)

    Carwardine, J.A.; Milton, S.V.; McGhee, D.G.

    1995-01-01

    The Advanced Photon Source (APS) booster ramp cycle is completed within 250ms and repeated at 2Hz. Separate phase-controlled power supplies deliver current to each of the dipole, quadrupole, and sextupole magnet families. Tracking requirements are particularly challenging because of the fast (non-resonant) ramp. In order to meet the requirements, both conventional regulation and cycle-to-cycle adaptation are used. The power supply system and its performance are described

  2. High power fast ramping power supplies

    Energy Technology Data Exchange (ETDEWEB)

    Marneris,I.; Bajon, E.; Bonati, R.; Sandberg, J.; Roser, T.; Tsoupas, N.

    2009-05-04

    Hundred megawatt level fast ramping power converters to drive proton and heavy ion machines are under research and development at accelerator facilities in the world. This is a leading edge technology. There are several topologies to achieve this power level. Their advantages and related issues will be discussed.

  3. Detecting and characterising ramp events in wind power time series

    International Nuclear Information System (INIS)

    Gallego, Cristóbal; Cuerva, Álvaro; Costa, Alexandre

    2014-01-01

    In order to implement accurate models for wind power ramp forecasting, ramps need to be previously characterised. This issue has been typically addressed by performing binary ramp/non-ramp classifications based on ad-hoc assessed thresholds. However, recent works question this approach. This paper presents the ramp function, an innovative wavelet- based tool which detects and characterises ramp events in wind power time series. The underlying idea is to assess a continuous index related to the ramp intensity at each time step, which is obtained by considering large power output gradients evaluated under different time scales (up to typical ramp durations). The ramp function overcomes some of the drawbacks shown by the aforementioned binary classification and permits forecasters to easily reveal specific features of the ramp behaviour observed at a wind farm. As an example, the daily profile of the ramp-up and ramp-down intensities are obtained for the case of a wind farm located in Spain

  4. Power Supply of the Booster Magnets for the ILSF Synchrotron

    Directory of Open Access Journals (Sweden)

    O Ahmadi

    2017-08-01

    Full Text Available The Iranian Light Source Facility (ILSF booster main specifications including 250 ms ramp up, 2Hz repetition rate, and quasi-sinusoidal wave shape, up to this point have been the basis for calculations. Each family of magnets including Dipole, Quadrupole and Sextupoles will feed by individual power supply. In order to maintain constant transverse tunes and chromaticity while the beam is accelerated, quadrupole and sextupole magnet currents must closely track the current in the dipole magnets. In booster rings, feeding the high inductance load, tracking of Quadrupole and sextupole magnets, reducing output current fluctuation and having a precise high bandwidth current regulation system are particular challenges. In order to meet the requirements, it is necessary to have a fully digital controller to achieve a fast regulation system. The prototype power supply and its test results are described in this paper  

  5. A survey on wind power ramp forecasting.

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, C.; Gama, J.; Matias, L.; Botterud, A.; Wang, J. (Decision and Information Sciences); (INESC Porto)

    2011-02-23

    The increasing use of wind power as a source of electricity poses new challenges with regard to both power production and load balance in the electricity grid. This new source of energy is volatile and highly variable. The only way to integrate such power into the grid is to develop reliable and accurate wind power forecasting systems. Electricity generated from wind power can be highly variable at several different timescales: sub-hourly, hourly, daily, and seasonally. Wind energy, like other electricity sources, must be scheduled. Although wind power forecasting methods are used, the ability to predict wind plant output remains relatively low for short-term operation. Because instantaneous electrical generation and consumption must remain in balance to maintain grid stability, wind power's variability can present substantial challenges when large amounts of wind power are incorporated into a grid system. A critical issue is ramp events, which are sudden and large changes (increases or decreases) in wind power. This report presents an overview of current ramp definitions and state-of-the-art approaches in ramp event forecasting.

  6. Nuclear and thermal power plant power ramping capability

    International Nuclear Information System (INIS)

    Golovach, E.A.

    1983-01-01

    The possibilities of step power increase by NPP and TPP units under emergency conditions of power grids operation are considered. The data analysis has shown that power units ramping capability with WWER-440, WWER-1000 and RBMK-1000 reactors is higher than that of 300 MW power units on fossil fuel, at the initial time interval (0-30 s). These NPP power units satisfy as to ramping capability the energy system requirements. Higher NPP power units ramping capability is explained by the fact that relative pressure before turbine valves is decreased less than in straight-through boilers while the steam volumes time constant of steam separator-superheaters is less than that of intermediate superheatings. Higher power unit ramping capability with WWER-440 and RBMK-1000 reactors as compared with the WWER-1000 reactor is pointed out as well as the increase of WWER-1000 power unit capability using high-speed turbines

  7. Fuel cladding mechanical interaction during power ramps

    International Nuclear Information System (INIS)

    Guerin, Y.

    1985-01-01

    Mechanical interaction between fuel and cladding may occur as a consequence of two types of phenomenon: i) fuel swelling especially at levels of caesium accumulation, and ii) thermal differential expansion during power changes. Slow overpower ramps which may occur during incidental events are of course one of the circumstances responsible for this second type of fuel cladding mechanical interaction (FCMI). Experiments and analysis of this problem that have been done at C.E.A. allow to determine the main parameters which will fix the level of stress and the risk of damage induced by the fuel in the cladding during overpower transients

  8. The Studsvik power transient programs Demo-Ramp II and Trans-Ramp I

    International Nuclear Information System (INIS)

    Bergenlid, U.; Lysell, G.; Mogard, H.; Roennberg, G.

    1984-01-01

    The Studsvik Demo-Ramp II och Trans-Ramp I are internationally sponsored research programs. The main objectives are similar in both programs: to study the effects on the PCI/SCC failure process of short time power transients, above the failure threshold where cladding failure (FP leakage) is expected to occur after a sufficient hold time. Demo-Ramp II is completed, whereas, at present, Trans-Ramp I is in progress. Test fuel rods of standard BWR design are used. The fuel rods have been base-irradiated in a power reactor (burn-up in the range 18 to 29 MWd/kg U) and subsequently ramp tested in the R2 reactor. Extensive examinations of the rods have been performed. In the Demo-Ramp II program a large number of incipient cladding cracks were observed to be formed more rapidly than expected, based on previous knowledge. It was possible to operate one rod for a very short time above the failure threshold without SCC crack formation. One objective of the Trans-Ramp I program is to define more closely the power-time region above the failure threshold where the rods remain intact after power transients. (author)

  9. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  10. Power flow control using quadrature boosters

    Science.gov (United States)

    Sadanandan, Sandeep N.

    A power system that can be controlled within security constraints would be an advantage to power planners and real-time operators. Controlling flows can lessen reliability issues such as thermal limit violations, power stability problems, and/or voltage stability conditions. Control of flows can also mitigate market issues by reducing congestion on some lines and rerouting power to less loaded lines or onto preferable paths. In the traditional control of power flows, phase shifters are often used. More advanced methods include using Flexible AC Transmission System (FACTS) Controllers. Some examples include Thyristor Controlled Series Capacitors, Synchronous Series Static Compensators, and Unified Power Flow Controllers. Quadrature Boosters (QBs) have similar structures to phase-shifters, but allow for higher voltage magnitude during real power flow control. In comparison with other FACTS controllers QBs are not as complex and not as expensive. The present study proposes to use QBs to control power flows on a power system. With the inclusion of QBs, real power flows can be controlled to desired scheduled values. In this thesis, the linearized power flow equations used for power flow analysis were modified for the control problem. This included modifying the Jacobian matrix, the power error vector, and calculating the voltage injected by the quadrature booster for the scheduled real power flow. Two scenarios were examined using the proposed power flow control method. First, the power flow in a line in a 5-bus system was modified with a QB using the method developed in this thesis. Simulation was carried out using Matlab. Second, the method was applied to a 30-bus system and then to a 118-bus system using several QBs. In all the cases, the calculated values of the QB voltages led to desired power flows in the designated line.

  11. Prediction of power-ramp defects in CANDU fuel

    International Nuclear Information System (INIS)

    Gillespie, P.; Wadsworth, S.; Daniels, T.

    2010-01-01

    Power ramps result in fuel pellet expansion and can lead to fuel sheath failures by fission product induced stress corrosion cracking (SCC). Historically, empirical models fit to experimental test data were used to predict the onset of power-ramp failures in CANDU fuel. In 1988, a power-ramped fuel defect event at PNGS-1 led to the refinement of these empirical models. This defect event has recently been re-analyzed and the empirical model updated. The empirical model is supported by a physically based model which can be used to extrapolate to fuel conditions (density, burnup) outside of the 1988 data set. (author)

  12. CFD Assessment of Forward Booster Separation Motor Ignition Overpressure on ET XT 718 Ice/Frost Ramp

    Science.gov (United States)

    Tejnil, Edward; Rogers, Stuart E.

    2012-01-01

    Computational fluid dynamics assessment of the forward booster separation motor ignition over-pressure was performed on the space shuttle external tank X(sub T) 718 ice/frost ramp using the flow solver OVERFLOW. The main objective of this study was the investigation of the over-pressure during solid rocket booster separation and its affect on the local pressure and air-load environments. Delta pressure and plume impingement were investigated as a possible contributing factor to the cause of the debris loss on shuttle missions STS-125 and STS-127. A simplified computational model of the Space Shuttle Launch Vehicle was developed consisting of just the external tank and the solid rocket boosters with separation motor nozzles and plumes. The simplified model was validated by comparison to full fidelity computational model of the Space Shuttle without the separation motors. Quasi steady-state plume solutions were used to calibrate the thrust of the separation motors. Time-accurate simulations of the firing of the booster-separation motors were performed. Parametric studies of the time-step size and the number of sub-iterations were used to find the best converged solution. The computed solutions were compared to previous OVERFLOW steady-state runs of the separation motors with reaction control system jets and to ground test data. The results indicated that delta pressure from the overpressure was small and within design limits, and thus was unlikely to have contributed to the foam losses.

  13. A criterion and mechanism for power ramp defects

    International Nuclear Information System (INIS)

    Garlick, A.; Gravenor, J.G.

    1978-02-01

    The problem of power ramp defects in water reactor fuel pins is discussed in relation to results recently obtained from ramp experiments in the Steam Generating Heavy Water Reactor. Cladding cracks in the defected fuel pins were similar, both macro- and micro structurally, to those in unirradiated Zircaloy exposed to iodine stress-corrosion cracking (scc) conditions. Furthermore, when the measured stress levels for scc in short-term tests were taken as a criterion for ramp defects, UK fuel modelling codes were found to give a useful indication of defect probability under reactor service conditions. The likelihood of sticking between fuel and cladding is discussed and evidence presented which suggests that even at power a degree of adhesion may be expected in some fuel pins. The ramp defect mechanism is discussed in terms of fission product scc, initiation being by intergranular penetration and propagation by cleavage when suitably orientated grains are exposed to large dilatational stresses ahead of the main crack. (author)

  14. Power ramp tests of BWR-MOX fuels

    International Nuclear Information System (INIS)

    Asahi, K.; Oguma, M.; Higuchi, S.; Kamimua, K.; Shirai, Y.; Bodart, S.; Mertens, L.

    1996-01-01

    Power ramp test of BWR-MOX and UO 2 fuel rods base irradiated up to about 60 GWd/t in Dodewaard reactor have been conducted in BR2 reactor in the framework of the international DOMO programme. The MOX pellets were provided by BN (MIMAS process) and PNC (MH method). The MOX fuel rods with Zr-liner and non-liner cladding and the UO 2 fuel rods with Zr-liner cladding remained intact during the stepwise power ramp tests to about 600 W/cm, even at about 60 GWd/t

  15. Power ramp performance of some 15 x 15 PWR test fuel rods tested in the STUDSVIK SUPER-RAMP and SUPER-RAMP extension projects

    International Nuclear Information System (INIS)

    Djurle, S.

    2000-01-01

    This paper presents results obtained from the STUDSVIK SUPER-RAMP (SR) and SUPER-RAMP EXTENSION (SRX) projects. As parts of these projects test fuel rods of the same PWR type were base irradiated in the Obrigheim power reactor and power ramp tested in the STUDSVIK R2 reactor. Some of the rods were ramped using an inlet coolant water temperature 50 deg. C below the normal one. Fabricated data on the test fuel rods are presented as well as data on the base irradiation, interim examination, conditioning irradiation, power ramp irradiation and results of the post irradiation examination. The data on the change of diameter at ridges due to power ramping have shown that a lower clad temperature during ramping leads to smaller deformations. Most likely this may be explained as due to a smaller creep rate in the cladding at the lower temperature, resulting in a more severe stress situation. The combination of low cladding temperature, high ramp terminal level and the presence of a stress corrosion agent may have caused the failure of one of the test rods. (author)

  16. Modelling of pellet-clad interaction during power ramps

    International Nuclear Information System (INIS)

    Zhou, G.; Lindback, J.E.; Schutte, H.C.; Jernkvist, L.O.; Massih, A.R.; Massih, A.R.

    2005-01-01

    A computational method to describe the pellet-clad interaction phenomenon is presented. The method accounts for the mechanical contact between fragmented pellets and the zircaloy clad, as well as for chemical reaction of fission products with zircaloy during power ramps. Possible pellet-clad contact states, soft, hard and friction, are taken into account in the computational algorithm. The clad is treated as an elastic-plastic-viscoplastic material with irradiation hardening. Iodine-induced stress corrosion cracking is described by using a fracture mechanics-based model for crack propagation. This integrated approach is used to evaluate two power ramp experiments made on boiling water reactor fuel rods in test reactors. The influence of the pellet-clad coefficient of friction on clad deformation is evaluated and discussed. Also, clad deformations, pellet-clad gap size and fission product gas release for one of the ramped rods are calculated and compared with measured data. (authors)

  17. IFPE/CNEA-MOX-RAMP, CNEA Power Ramp Irradiations with (PHWR) MOX Fuels

    International Nuclear Information System (INIS)

    Marino, Armando Carlos; Turnbull, J.A.

    2000-01-01

    Description: The irradiation of the first MOX nuclear fuel rods fabricated in Argentina began in 1986. These experiences were made in the HFR-Petten reactor, Holland. The six rods were fabricated in the a Facility (GAID-CNEA-Argentina). The first rod has been used for destructive pre-irradiation characterization in the KFK (Kernforschungszentrum Karlsruhe), Germany. The second one was a pathfinder for calibrating HFR systems in Petten. Two other rods included pellets doped with iodine. The first contained mostly CsI whilst the second contained elemental iodine. The concentration of iodine was intended to simulate a burn-up of 15000 MWd/ton(M). The power histories were defined from calculations performed with the BACO code. A 15 day cycle was assumed with a power history that induced PCMI during power cycling. The last high power period was maintained until stress corrosion cracking (SCC) was induced. Two further un-doped rods were used in a sub-program named BU15. Here a burn-up of 15000 MWd/ton(M) was achieved at a low power followed by a final power ramp for one of the rods. The ramp was similar to that used for the Iodine test. The HFR irradiation was conducted satisfactorily. The objective was to attempt a correspondence in behaviour between the doped rods and BU15 rods. PIE detected the presence of micro-cracks inside the cladding of the iodine doped rods. Ramping of the BU15 rod was interrupted when an increase of coolant activity was detected. After discharge, a visual inspection of the rod showed the presence of a small circular hole in the cladding. Additional PIE showed that the hole was due to a SCC failure

  18. Evaluation of axial fission gas transport in power ramping experiments

    International Nuclear Information System (INIS)

    Kinoshita, Motoyasu

    1986-01-01

    The LINUS code calculates advective and diffusional transport of fission gas towards an upper plenum through the pellet-cladding gap. The basic equations were modified for analyzing a multi-component gas mixture in the gap and also for dealing with opening and/or closing of the gap, which induces additional axial gas flow. Analysis of the Petten ramp experiment shows that helium pressurization is effective in suppressing an ascending rate of fission gas concentration. After the maximum concentration is achieved through power ramping, the gas concentration could be described by a steady state analytical solution which does not depend on the filling gas pressure. (author)

  19. Power Ramp Limitation capabilities of Large PV Power Plants with Active Power Reserves

    DEFF Research Database (Denmark)

    Bogdan, Craciun; Kerekes, Tamas; Sera, Dezso

    2017-01-01

    Power Ramp Limitation (PRL) is likely to become a requirement for large scale photovoltaic power plants (LPVPPs) in order to allow the increase of PV penetration levels. Especially in islands with reduced inertia capability, this problem is more stringent: high power ramp can be caused by either...... fast irradiance changes or other participant generators for example wind power, or loads. In order to compensate for the power mismatch, LPVPPs must use Active Power Reserve (APR), by either curtailment or auxiliary storage. The paper proposes a PRL control structure for dynamic APR sizing...... and deployment. The selected test case is the power system of Puerto Rico (PREPA), modeled using the modified IEEE 12 bus benchmark system, with different levels of PV penetration. It is shown that LPVPP with PRL can effectively reduce the ramping rate of the participating generators. Considering that the large...

  20. Development of the power ramping facility at JMTR

    International Nuclear Information System (INIS)

    Nakata, Hirokatsu; Sezaki, Katsuji; Nakazaki, Chosaburo; Ishii, Tadahiko; Ito, Haruhiko; Abe, Hiroshi

    1985-03-01

    The LWR fuel power ramping facility have been being developed at JMTR since 1978. This report, following previous reports, JAERI-M 8533 and 9343, summarizes the results of performance test performed in 1981 on the 3 He power controlled boiling water capsule, which is a basic part of the facility. Various measurements were carried out during reactor operation on each part of the capsule, i.e. capsule itself, capsule control unit and 3 He power control unit, after a long-time cold run test of the units. Through the test, it was confirmed that the capsule satisfies the specifications which stated that LWR fuel pin should be power-ramped under BWR conditions up to 50 kW/m with a change factor of more than 2, and that the control units operate in a good condition. (author)

  1. Developing the World's Most Powerful Solid Booster

    Science.gov (United States)

    Priskos, Alex S.; Frame, Kyle L.

    2016-01-01

    NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are underway with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing

  2. Power ramping/cycling experience and operational recommendations in KWU power plants

    International Nuclear Information System (INIS)

    Jan, R. von; Wunderlich, F.; Holzer, R.

    1980-01-01

    The power cycling and ramping experience of KWU is based on experiments in test and commercial reactors, and on evaluation of plant operation (PHWR, PWR and BWR). Power cycling of fuel rods have never lead to PCI failures. In ramping experiments, for fast ramps PCI failure thresholds of 480/420 W/cm are obtained at 12/23 GWd/t(U) burn-up for pressurized PWR fuel. No failures occurred during limited exceedance of the threshold with reduced ramp rate. Operational recommendations used by KWU are derived from experiments and plant experience. The effects of ramping considerations on plant operation is discussed. No rate restrictions are required for start-ups during an operating cycle or load follow operation within set limits for the distortion of the local power distribution. In a few situations, e.g. start-up after refueling, ramp rates of 1 to 5 %/h are recommended depending on plant and fuel design

  3. Investigation of WWER fuel behaviour under MIR power ramps

    International Nuclear Information System (INIS)

    Bibilashvili, Yu.K.; Novikov, V.V.; Agafonov, S.N.

    1996-01-01

    The paper discusses results of experimental WWER fuel investigation under power ramps. Specificity of using the research reactor ''MIR'' to accomplish scheduled power rating of fuel is considered. The paper presents the methodology of experiments using irradiation facility ''TEST''. Reactor experiments were performed at burn-up ∼ 10000 MW.day/t UO 2 using standard fuel pins and the ones having backfitted fuel and cladding. (author). 7 figs, 1 tab

  4. Power ramp tests of high burnup BWR segment rods

    International Nuclear Information System (INIS)

    Hayashi, H.; Etoh, Y.; Tsukuda, Y.; Shimada, S.; Sakurai, H.

    2002-01-01

    Lead use assemblies (LUAs) of high burnup 8x8 fuel design for Japanese BWRs were irradiated up to 5 cycles in Fukushima Daini Nuclear Power Station No. 2 Unit. Segment rods were installed in LUAs and used for power ramp tests in Japanese Material Test Reactor (JMTR). Post irradiation examinations (PIEs) of segment rods were carried out at Nippon Nuclear Fuel Development Co., Ltd. before and after ramp tests. Maximum linear heat rates of LUAs were kept above 300 W/cm in the first cycle, above 250 W/cm in the second and third cycles and decreased to 200 W/cm in the fourth cycle and 80 W/cm in the fifth cycle. The integrity of high burnup 8x8 fuel was confirmed up to the bundle burnup of 48 GWd/t after 5 cycles of irradiation. Systematic and high quality data were collected through detailed PIEs. The main results are as follows. The oxide on the outer surface of cladding tubes was uniform and its thickness was less than 20 micro-meter after 5 cycles of irradiation and was almost independent of burnup. Hydrogen contents in cladding tubes were less than 150 ppm after 5 cycles of irradiation, although hydrogen contents increased during the fourth and fifth irradiation cycles. Mechanical properties of cladding tubes were on the extrapolated line of previous data up to 5 cycles of irradiation. Fission gas release rates were in the low level (mainly less than 6%) up to 5 cycles of irradiation due to the design to decrease pellet temperature. Pellet-cladding bonding layers were observed after the third cycle and almost full bonding was observed after the fifth cycle. Pellet volume increased with burnup in proportion to solid swelling rate up to the forth cycle. After the fifth cycle, slightly higher pellet swelling was confirmed. Power ramp tests were carried out and satisfactory performance of Zr-lined cladding tube was confirmed up to 60 GWd/t (segment average burnup). One segment rod irradiated for 3 cycles failed by a single step ramp test at terminal ramp power of 614 W

  5. Development of 3He-BOCA power ramping facility, 1

    International Nuclear Information System (INIS)

    Nakata, Hirokatsu; Ishii, Tadahiko; Itoh, Haruhiko; Abe, Hiroshi; Nakazaki, Chozaburo

    1979-11-01

    Development of a He-3 power controlled boiling water capsule, 3 He-BOCS, for LWR fuels power ramping test in JMTR has been carried out since 1978 on a five-year program; in the reactor, irradiation tests of various fuels and structual materials have been made since 1969. Using stagnant-pressurized water as a thermal medium, the capsule provides pressure and temperature conditions similar to those in LWRs. Heat generation of a fuel pin can be controlled by a He-3 gas screen surrounding the capsule. The facility is capable of testing numbers of both fresh and irradiated fuel pins under LWR operating conditions for power ramping and cycling. After explaining the operating priciples of 3 He-BOCA and the development program, the following are described: the results of preliminary out-of-pile test on heat conductive characteristics of the capsule and a conceptual design of the 3 He-BOCA for power ramping of a short fuel pin from 250 W/cm to 500 W/cm under BWR conditions. (author)

  6. Dipole power supply for National Synchrotron Light Source Booster upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1992-01-01

    The booster at the NSLS is being upgraded from .75 to 2 pulses per second. To accomplish this, new power supplies for the dipole, quadrupole, and sextupole magnets have been designed and are being constructed. This paper will outline the design of the dipole power supply and control system, and will present results obtained thus far

  7. Digital signal array processor for NSLS booster power supply upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second. To accomplish this, new power supplied for the dipole, quadrupole, and sextupole have been installed. This paper will outline the design and function of the digital signal processor used as the primary control element in the power supply control system

  8. Preliminary study of AC power feeders for AGS booster

    International Nuclear Information System (INIS)

    Meth, M.

    1992-01-01

    It has been proposed that the AGS Heavy Ion/Proton Booster be excited directly from the electric power distribution system without intervening an energy storage buffer such as an MG set or a magnetic energy buffer. The average power requirement of the AGS Booster is less than many single-loads presently housed on the lab site. However, the power swing will be the largest single pulsating load on the lab site. The large power swings will impact on the power grid producing utility-line disturbances such as voltage fluctuations and harmonic generation. Thus, it is necessary to carefully evaluate the quality of the electric power system resulting from the interconnection, such that the utility system is not degraded either on the lab site or at LILCO's substation

  9. The AGS Booster main ring power supply system

    International Nuclear Information System (INIS)

    Soukas, A.; Hughes, K.; Sandberg, J.; Toldo, F.; Zhang, S.Y.

    1989-01-01

    The AGS Booster is being designed as a very versatile particle accelerator. Its primary function is to be a high quality injector to the currently operating Alternating Gradient Synchrotron (AGS). The Booster/AGS combination will produce proton intensities greater than 5 x 10 13 protons per pulse (ppp), and accelerate heavy ions, with mass up to 200, to a maximum energy of 15 GeV per atomic mass unit (GeV/amu). The power supply for the Booster Main Ring (BMRPS) has to accommodate a wide range of cycles and a wide range of operating parameters. The cycles range from storage for several seconds to rapid cycling at 7.5 Hz. The peak output power is 18 MW. This paper will describe the AGS Booster machine powering requirements, the choice of power supply, the a.c. circuit tie-in and its associated problems and some of the details of the design of the BMRPS. 9 refs., 2 figs

  10. 76 FR 11680 - Digital Low Power Television, Television Translator, and Television Booster Stations and Digital...

    Science.gov (United States)

    2011-03-03

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and Digital Class A... Commission's Rules to Establish Rules for Digital Low Power, Television Translator, and Television Booster... Digital Low Power Television Translator, Television Booster Stations, and to Amend Rules for Digital Class...

  11. Windscale nuclear power development laboratories power ramp experience in the Winfrith SGHWR (UK)

    International Nuclear Information System (INIS)

    Garlick, A.; Sumerling, R.; Stuttard, A.; Bond, G.G.; Howl, D.A.; Fox, W.N.; Cordall, D.; Cornell, R.M.

    SGHWR fuel has sufficient power ramping capability to permit considerable latitude in fuel management schemes. However, beyond some limiting ramping conditions, there is risk of fuel defecting. Controlled ramp experiments were therefore carried out in the reactor in order to determine the defect mechanism and define the fuel operating limitations. Cladding cracks produced during these power ramps are considered to have been a consequence of fission product stress-corrosion attack. A critical stress level for cracking, based on laboratory stress corrosion tests, have been used successfully in conjunction with computer codes to calculate cladding stresses and strains in fuel rods. Initial analysis of the conditions under which a fuel element defected at 11.6 MWd/kgU suggests that the threshold stress for failure may be decreased compared with elements at lower burn-up (5-6 MWd/kgU)

  12. Analysis of mechanical and chemical pellet-clad interaction during power ramps

    International Nuclear Information System (INIS)

    Vogl, W.; Hering, W.; Peehs; Lavake, J.

    1979-01-01

    A research and development program is being conducted by KWU and C-E to investigate Pellet/Clad Interaction (PCI) in LWR fuel rods during power ramping. Out-of-pile iodine stress corrosion cracking studies, in-pile ramp experiments and hot cell chemical and metallographical post-irradiation examinations are being performed to study and evaluate both the power limitations and the basic mechanisms of PCI as well as practical methods to improve ramping performance. (orig.)

  13. An effective heuristic for combined heat-and-power production planning with power ramp constraints

    International Nuclear Information System (INIS)

    Rong, Aiying; Lahdelma, Risto

    2007-01-01

    Combined heat-and-power (CHP) production is an increasingly important technology for its efficient utilization of primary-energy resources and for reducing CO 2 emissions. In the CHP plant, the generation of heat-and-power follows a joint characteristic, which makes the determination of both the marginal power production cost (MPPC) and the feasible operating region for the plant more complicated than for the power-only generation plant. Due to the interdependence between heat and power production, the power-ramp constraints, which limit how much the power production of a CHP plant may increase or decrease between two successive periods, may also imply constraints on the heat production. In this paper, we investigate the impact of power-ramp constraints on CHP production planning and develop a robust heuristic for dealing with the power-ramp constraints based on the solution to the problem with relaxed ramp-constraints (RRC). Numerical results based on realistic production models show that the heuristic can generate high-quality solutions efficiently. (author)

  14. Optimized Swinging Door Algorithm for Wind Power Ramp Event Detection: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Mingjian; Zhang, Jie; Florita, Anthony R.; Hodge, Bri-Mathias; Ke, Deping; Sun, Yuanzhang

    2015-08-06

    Significant wind power ramp events (WPREs) are those that influence the integration of wind power, and they are a concern to the continued reliable operation of the power grid. As wind power penetration has increased in recent years, so has the importance of wind power ramps. In this paper, an optimized swinging door algorithm (SDA) is developed to improve ramp detection performance. Wind power time series data are segmented by the original SDA, and then all significant ramps are detected and merged through a dynamic programming algorithm. An application of the optimized SDA is provided to ascertain the optimal parameter of the original SDA. Measured wind power data from the Electric Reliability Council of Texas (ERCOT) are used to evaluate the proposed optimized SDA.

  15. Power ramp testing method for PWR fuel rod at research reactor

    International Nuclear Information System (INIS)

    Zhou Yidong; Zhang Peisheng; Zhang Aimin; Gao Yongguang; Wang Huarong

    2003-01-01

    A tentative power ramp test for short PWR fuel rod has been conducted at the Heavy Water Research Reactor (HWRR) in China Institute of Atomic Energy (CIAE). The test fuel rod was cooled by the circulating water in the test loop. The power ramp was realized by moving solid neutron-absorbing screen around the fuel rod. The linear power of the fuel rod increased from 220 W/cm to 340 W/cm with a power ramp rate of 20 W/cm/min. The power of the fuel rod was monitored by both in-core thermal and nuclear measurement sensors in the test rig. This test provides experiences for further developing the power ramp test methods for PWR fuel rods at research reactor. (author)

  16. Assessment on Startup Ramp Rate and Threshold Power of OPR1000

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kiyoung; Kim, Yongbae; Cha, Gyunho; Kim, Yongdeog [Korea Hydro and Nuclear Power Co., Ltd., Daejeon (Korea, Republic of)

    2014-05-15

    This paper summarizes PCI assessment according to several startup ramp rates and threshold power assessment of OPR1000. The definition of threshold power is maximum value in power range that can increase startup ramp rate rapidly. FALCON code is used for PCI assessment and it is analyzed for once-burned fuel because it is the most sensitive to PCI failure. The objective of the PCI analysis is to assess the cladding stress state under various power ramp conditions at the peak power node location. The PCI analyses were conducted for the once-burned fuel from the start of the second cycle to plant power 100%. This paper presents both the PCI analysis according to startup ramp rates and threshold power assessment result like below. · The more startup ramp rate is increased, the more PCI failure probability is decreased in low power range (≤ 40%). · PCI failure is not occurred even though startup ramp rate is 10%/hr until the plant power reaches 55%.

  17. Assessment on Startup Ramp Rate and Threshold Power of OPR1000

    International Nuclear Information System (INIS)

    Kim, Kiyoung; Kim, Yongbae; Cha, Gyunho; Kim, Yongdeog

    2014-01-01

    This paper summarizes PCI assessment according to several startup ramp rates and threshold power assessment of OPR1000. The definition of threshold power is maximum value in power range that can increase startup ramp rate rapidly. FALCON code is used for PCI assessment and it is analyzed for once-burned fuel because it is the most sensitive to PCI failure. The objective of the PCI analysis is to assess the cladding stress state under various power ramp conditions at the peak power node location. The PCI analyses were conducted for the once-burned fuel from the start of the second cycle to plant power 100%. This paper presents both the PCI analysis according to startup ramp rates and threshold power assessment result like below. · The more startup ramp rate is increased, the more PCI failure probability is decreased in low power range (≤ 40%). · PCI failure is not occurred even though startup ramp rate is 10%/hr until the plant power reaches 55%

  18. Power ramp tests of MOX fuel rods. HBWR irradiation with the instrument rig, IFA-591

    International Nuclear Information System (INIS)

    Ozawa, Takayuki; Abe, Tomoyuki

    2006-03-01

    Plutonium-uranium mixed oxide (MOX) fuel rods of instrumental rig IFA-591 were ramped in HBWR to study the Advanced Thermal Reactor (ATR) MOX fuel behavior during transient operation and to determine a failure threshold of the MOX fuel rods. Eleven segments were base-irradiated in ATR 'FUGEN' up to 18.4 GWd/t. Zirconium liner claddings were adopted for four segments of them. As the results of non-destructive post irradiation examinations (PIEs) after the base-irradiation and before the ramp tests, no remarkable behavior affecting the integrity of fuel assembly and fuel rod was confirmed. All segments to be used for the ramp tests, which consisted of the multi-step ramp tests and the single-step ramp tests, had instrumentations for in-pile measurements of cladding elongation or plenum pressure, and heated up to the maximum linear power of 58.3-68.4 kW/m without failure. The major results of ramp tests are as follows: There is no difference in PCMI behaviors between two type rods of Zry-2 and Zirconium liner claddings from the in-pile measurements of cladding elongation and plenum pressure. The computations of cladding elongation and inner pressure gave slightly lower elongation and pressure than the in-pile measurements during the ramp-test. However, the cladding relaxation during the power hold was in good agreement, and the fission gas release behavior during cooling down could be evaluated by taking into account the relaxation of contact pressure between pellet and cladding. Although the final power during IFA-591 ramp tests reached the higher linear power than the failure threshold power of UO 2 fuel rods, no indication of fuel failure was observed during the ramp tests. The cladding relaxation due to the creep deformation of the MOX pellets at high temperature could be confirmed at the power steps during the multi-ramp test. The fission gas release due to the emancipation from PCMI stress was observed during the power decreasing. The burn-up dependence could be

  19. Prediction of power ramp defects - development of a physically based model and evaluation of existing criteria

    International Nuclear Information System (INIS)

    Notley, M.J.F.; Kohn, E.

    2001-01-01

    Power-ramp induced fuel failure is not a problem in the present CANDU reactors. The current empirical correlations that define probability of failure do not agree one-with-another and do not allow extrapolation outside the database. A new methodology, based on physical processes, is presented and compared to data. The methodology calculates the pre-ramp sheath stress and the incremental stress during the ramp, and whether or not there is a defect is predicted based on a failure threshold stress. The proposed model confirms the deductions made by daSilva from an empirical 'fit' to data from the 1988 PNGS power ramp failure incident. It is recommended that daSilvas' correlation be used as reference for OPG (Ontario Power Generation) power reactor fuel, and that extrapolation be performed using the new model. (author)

  20. Power cycling and ramp test in R-2 and Mihama Unit 2 for MHI PWR fuels

    International Nuclear Information System (INIS)

    Baba, T.; Takahashi, T.; Kubo, H.; Fujiwara, Y.; Kondo, Y.

    1983-01-01

    Up to the present time, Mitsubishi has manufactured approximately 3000 fuel assemblies for Japanese PWRs, of which performance in reactors is satisfactory under base load operation. For the forthcoming load following age in Japan, expected in mid eighties, Mitsubishi is performing various R and D programs, so that load following operation can be smoothly introduced with current good performance maintained. R and D programs consist of two phases. One is the verification and demonstration of power ramping and cycling capability of the current design fuels, and the other is the development of remedy fuels with more operational margin. This paper describes the recent results obtained for the former phase, especially for the following two programs: (1) Power cycling and ramp test in R-2; (2) Power ramp demonstration (PRD) in Mihama Unit 2 (PRD-1). PIE works for power cycling and ramp test rods have been almost completed. The second PRD will be performed early in 1983

  1. 76 FR 44821 - Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend...

    Science.gov (United States)

    2011-07-27

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend Rules... Digital Low Power Television, Television Translator, and Television Booster Stations and to Amend Rules... translator facilities in the 700 MHz band. These provisions provide procedures for a primary wireless...

  2. 76 FR 72849 - Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend...

    Science.gov (United States)

    2011-11-28

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and To Amend Rules... for Digital Low Power Television, Television Translator, and Television Booster Stations and to Amend... television, TV translator, and Class A television station DTV licensees''). The Commission has also revised...

  3. 75 FR 63766 - Digital Low Power Television, Television Translator, and Television Booster Stations and Digital...

    Science.gov (United States)

    2010-10-18

    ...] Digital Low Power Television, Television Translator, and Television Booster Stations and Digital Class A... TV, TV Translator or TV Booster Station, FCC Form 346; 47 CFR 74.793(d); LPTV Out-of-Core Digital... collection requirements: 47 CFR 74.793(d) proposes that certain digital low power and TV translator stations...

  4. Power supply for 700 MeV booster ring dipole and quadrupole magnets

    International Nuclear Information System (INIS)

    Thipsay, A.P.; Kotaiah, S.; Ramamurthi, S.S.

    1993-01-01

    The power supply to energize main coils of the booster dipole and quadrupole magnets which are connected in series is discussed. The current in this coils is increased from 28.6 Amps at injection energy (20 MeV) to 1000 Amps at the extraction energy (700 MeV) in 0.2 sec with a stability of 0.1%. Current is maintained at 1000 Amps for 0.05 to 0.166 sec with 0.02% stability after which the current is brought down fast to the injection energy level to get the required repetition rate of 2 Hz. The rectifier stage uses four fully controlled thyristorised bridges connected in series which are switched selectively at different times to get the required trapezoidal current waveform. In the ramp down period, all the bridges are operated in the inverter mode, whereby the stored energy in the magnets is fed back to the mains. An inductor and a capacitor is used as a passive filter to attenuate the voltage ripple to the rectifier. Two capacitor banks in the passive filter are switched selectively while ramping and flat top periods to reduce the error in current within tolerable limits. An active filter is used to further reduce ripple current in magnets. The current control circuit is characterized by two loops, one with voltage feedback and the other with a current feedback. A feed forward correction is also given in the voltage feedback loop to account for the charge in the inductance of the magnets at different current levels. (author). 2 figs

  5. Solar Power Ramp Events Detection Using an Optimized Swinging Door Algorithm: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Mingjian; Zhang, Jie; Florita, Anthony; Hodge, Bri-Mathias; Ke, Deping; Sun, Yuanzhang

    2015-08-07

    Solar power ramp events (SPREs) are those that significantly influence the integration of solar power on non-clear days and threaten the reliable and economic operation of power systems. Accurately extracting solar power ramps becomes more important with increasing levels of solar power penetrations in power systems. In this paper, we develop an optimized swinging door algorithm (OpSDA) to detection. First, the swinging door algorithm (SDA) is utilized to segregate measured solar power generation into consecutive segments in a piecewise linear fashion. Then we use a dynamic programming approach to combine adjacent segments into significant ramps when the decision thresholds are met. In addition, the expected SPREs occurring in clear-sky solar power conditions are removed. Measured solar power data from Tucson Electric Power is used to assess the performance of the proposed methodology. OpSDA is compared to two other ramp detection methods: the SDA and the L1-Ramp Detect with Sliding Window (L1-SW) method. The statistical results show the validity and effectiveness of the proposed method. OpSDA can significantly improve the performance of the SDA, and it can perform as well as or better than L1-SW with substantially less computation time.

  6. Suitability of representative electrochemical energy storage technologies for ramp-rate control of photovoltaic power

    Science.gov (United States)

    Jiang, Yu; Fletcher, John; Burr, Patrick; Hall, Charles; Zheng, Bowen; Wang, Da-Wei; Ouyang, Zi; Lennon, Alison

    2018-04-01

    Photovoltaic (PV) systems can exhibit rapid variances in their power output due to irradiance changes which can destabilise an electricity grid. This paper presents a quantitative comparison of the suitability of different electrochemical energy storage system (ESS) technologies to provide ramp-rate control of power in PV systems. Our investigations show that, for PV systems ranging from residential rooftop systems to megawatt power systems, lithium-ion batteries with high energy densities (up to 600 Wh L-1) require the smallest power-normalised volumes to achieve the ramp rate limit of 10% min-1 with 100% compliance. As the system size increases, the ESS power-normalised volume requirements are significantly reduced due to aggregated power smoothing, with high power lithium-ion batteries becoming increasingly more favourable with increased PV system size. The possibility of module-level ramp-rate control is also introduced, and results show that achievement of a ramp rate of 10% min-1 with 100% compliance with typical junction box sizes will require ESS energy and power densities of 400 Wh L-1 and 2300 W L-1, respectively. While module-level ramp-rate control can reduce the impact of solar intermittence, the requirement is challenging, especially given the need for low cost and long cycle life.

  7. Control of Fermilab Booster tunes

    International Nuclear Information System (INIS)

    Johnson, R.P; Meisner, K.; Sandberg, B.

    1977-01-01

    Control of the radial and vertical tunes of the booster is implemented using ramped correction quadrupoles. Minor modifications to the power supply cards for the 48 (previously) dc correction quadrupoles allow ''the tunes'' to be continuously programmed or held constant throughout the 33 ms acceleration cycle. This capability is in addition to the usual use of these quadrupoles to be independently varied to correct for harmonic distortions in the lattice. An automatic computer program measures and displays the tunes vs. time in the cycle to monitor performance and to allow the ramps to be adjusted by the machine operator

  8. Survey of the power ramp performance testing of KWU'S PWR UO 2, fuel

    Science.gov (United States)

    Ga¨rtner, M.; Fischer, G.

    1987-06-01

    To determine the power ramp performance of KWU's PWR UO 2 fuel, 134 fuel rodlets with burnups of up to 46 GWd/ t (U) and several fuel assemblies with 19 to 30 GWd/t (U) burnup were ramped in power in the research reactors HFR Petten/The Netherlands and R2 Studsvik/Sweden and in the power plants KWO and KWB-A/Germany, respectively. The power ramp tests demonstrate decreasing resistance of the PWR fuel rods to PCI (pellet-to-clad interaction) up to fuel burnups of 35 GWd/t (U) and a reversal effect at higher burnups. The fuel rods can be operated free of defects at fast power transients to linear heat generation rates of up to 400 W/cm, at least.Power levels of up to 490 W/cm can be reached without defects by reducing the ramp rate. After reshuffling according to an out-in scheme, 1-cycle fuel assemblies may return to rod powers of up to 480 W/cm with a power increase rate of up to 10 W/(cm min) without fuel rod damage. Set points basing on these test results and incorporated into the power distribution control and power density limitation system of KWU's advanced power plants guarantee safe plant operation under normal and load follow operating conditions.

  9. Extrapolating power-ramp performance criteria for current and advanced CANDU fuels

    Energy Technology Data Exchange (ETDEWEB)

    Tayal, M.; Chassie, G.G

    2000-06-01

    To improve the precision and accuracy of power-ramp performance criteria for high-burnup fuel, we have examined in-reactor fuel performance data as well as out-reactor test data. The data are consistent with some of the concepts used in the current formulations for defining fuel failure thresholds, such as size of power-ramp and extent of burnup. Our review indicates that there is a need to modify some other aspects of the current formulations; therefore, a modified formulation is presented in this paper. The improvements mainly concern corrodent concentration and its relationships with threshold stress for failure. The new formulation is consistent with known and expected trends such as strength of Zircaloy in corrosive environment, timing of the release of fission products to the pellet-to-sheath gap, CANLUB coating, and fuel burnup. Because of the increased precision and accuracy, the new formulation is better able to identify operational regimes that are at risk of power-ramp failures; this predictive ability provides enhanced protection to fuel against power-ramp defects. At die same time, by removing unnecessary conservatisms in other areas, the new formulation permits a greater range of defect-free operational envelope as well as larger operating margins in regions that are, in fact, not prone to power-ramp failures. (author)

  10. Japanese programme on the development of high duty fuel and related power ramping tests

    Energy Technology Data Exchange (ETDEWEB)

    Mishima, Y

    1983-06-01

    Power ramping tests hitherto planned or carried out in Japan can be classified into two categories: 1) the tests programme by private organizations on fuel behaviour under various conditions of power ramping, in participating international programmes; and 2) a partially government sponsored programme, which was officially inaugurated in 1981 under the title of High-Duty Fuel Development Programme. The latter has been carried out by the Nuclear Power Engineering Test Centre, based on the schedule decided by the MITI Committee (chaired by the author), for a period of 10 years. These programmes will be described with emphasis on the latter (National Programme). (author)

  11. Japanese programme on the development of high duty fuel and related power ramping tests

    International Nuclear Information System (INIS)

    Mishima, Y.

    1983-01-01

    Power ramping tests hitherto planned or carried out in Japan can be classified into two categories: 1) the tests programme by private organizations on fuel behaviour under various conditions of power ramping, in participating international programmes; and 2) a partially government sponsored programme, which was officially inaugurated in 1981 under the title of High-Duty Fuel Development Programme. The latter has been carried out by the Nuclear Power Engineering Test Centre, based on the schedule decided by the MITI Committee (chaired by the author), for a period of 10 years. These programmes will be described with emphasis on the latter (National Programme). (author)

  12. Performance evaluation of UO2-Zr fuel in power ramp tests

    International Nuclear Information System (INIS)

    Knudsen, P.; Bagger, C.

    1977-01-01

    In power reactors using UO 2 -Zr fuel, rapid power increases may lead to failures in fuel pins that have been irradiated at steady or decreasing heat loads. This paper presents results which extend the experience with power ramp performance of high burn-up fuel pins. A test fuel element containing both pellet and vipac UO 2 -Zr fuel pins was irradiated in the HBWR at Halden for effectively 2 1/2 years to an average burn-up of 21,000 MWD/te UO 2 at gradually decreasing power levels. The subsequent non-destructive characterization revealed formation of transverse cracks in the vipac fuel columns. After the HBWR irradiation, five of the fuel pins were power ramp tested individually in the DR 3 Reactor at Riso. The ramp rates in this test series were in the range 3-60 W/cm min. The maximum local heat loads seen in the ramp tests were 20-120% above the highest levels experienced at the same axial positions during the HBWR irradiation. Three pellets and one vipac fuel pin failed, whereas another vipac pin gave no indication of clad penetration. Profilometry after the ramp testing indicated the formation of small ridges for both types of fuel pins. For vipac fuel, the ridges were less regularly distributed along the pin length than for pellet fuel. Neutron radiography revealed the formation of additional transverse and longitudinal fuel cracks during the power ramps for both types of fuel pins. The observed failures seemed to be marginal since little or no indication as to the locations of the clad penetrations could be derived from the non-destructive post-irradiation examinations. The cases have been analyzed by means of the Danish fuel performance codes. The calculations, which are in general agreement with the observations, are discussed. The results of the investigations indicate qualitative similarities in over power performance of the two fuel types

  13. Probabilistic Wind Power Ramp Forecasting Based on a Scenario Generation Method

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Qin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Florita, Anthony R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Krishnan, Venkat K [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hodge, Brian S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cui, Mingjian [University of Texas at Dallas; Feng, Cong [University of Texas at Dallas; Wang, Zhenke [University of Texas at Dallas; Zhang, Jie [University of Texas at Dallas

    2018-02-01

    Wind power ramps (WPRs) are particularly important in the management and dispatch of wind power and currently drawing the attention of balancing authorities. With the aim to reduce the impact of WPRs for power system operations, this paper develops a probabilistic ramp forecasting method based on a large number of simulated scenarios. An ensemble machine learning technique is first adopted to forecast the basic wind power forecasting scenario and calculate the historical forecasting errors. A continuous Gaussian mixture model (GMM) is used to fit the probability distribution function (PDF) of forecasting errors. The cumulative distribution function (CDF) is analytically deduced. The inverse transform method based on Monte Carlo sampling and the CDF is used to generate a massive number of forecasting error scenarios. An optimized swinging door algorithm is adopted to extract all the WPRs from the complete set of wind power forecasting scenarios. The probabilistic forecasting results of ramp duration and start-time are generated based on all scenarios. Numerical simulations on publicly available wind power data show that within a predefined tolerance level, the developed probabilistic wind power ramp forecasting method is able to predict WPRs with a high level of sharpness and accuracy.

  14. Probabilistic Wind Power Ramp Forecasting Based on a Scenario Generation Method: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Qin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Florita, Anthony R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Krishnan, Venkat K [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hodge, Brian S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cui, Mingjian [Univ. of Texas-Dallas, Richardson, TX (United States); Feng, Cong [Univ. of Texas-Dallas, Richardson, TX (United States); Wang, Zhenke [Univ. of Texas-Dallas, Richardson, TX (United States); Zhang, Jie [Univ. of Texas-Dallas, Richardson, TX (United States)

    2017-08-31

    Wind power ramps (WPRs) are particularly important in the management and dispatch of wind power, and they are currently drawing the attention of balancing authorities. With the aim to reduce the impact of WPRs for power system operations, this paper develops a probabilistic ramp forecasting method based on a large number of simulated scenarios. An ensemble machine learning technique is first adopted to forecast the basic wind power forecasting scenario and calculate the historical forecasting errors. A continuous Gaussian mixture model (GMM) is used to fit the probability distribution function (PDF) of forecasting errors. The cumulative distribution function (CDF) is analytically deduced. The inverse transform method based on Monte Carlo sampling and the CDF is used to generate a massive number of forecasting error scenarios. An optimized swinging door algorithm is adopted to extract all the WPRs from the complete set of wind power forecasting scenarios. The probabilistic forecasting results of ramp duration and start time are generated based on all scenarios. Numerical simulations on publicly available wind power data show that within a predefined tolerance level, the developed probabilistic wind power ramp forecasting method is able to predict WPRs with a high level of sharpness and accuracy.

  15. Evaluations on power ramp data of PWR fuels by FROST and THERMOST codes

    International Nuclear Information System (INIS)

    Murai, K.; Ogawa, S.; Nuno, H.; Kondo, Y.

    1987-01-01

    An evaluation is presented of power ramp data of Mitsubishi's PWR fuel rods tested in R-2, Studsvik, which was analysed by FROST and THERMOST codes. The analyses give good predictions for measured diameter changes and on-power rod elongations. The work indicates that FROST is capable of analysing both radial and axial pellet-cladding mechanism interaction (PCMI) appropriately, and that predicted states of PCMI (i.e. stress and strain which cannot be measured directly) are considered to be reliable. The ramp data used in the present analyses were obtained in two joint programmes with five Japanese PWR utilities (KEPCO, KYEPCO, SEPCO, HEPCO, and JAPCO). (UK)

  16. IAEA specialists' meeting on power ramping and cycling behaviour of water reactor fuel. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-06-01

    At its fourth Annual Meeting, the IAEA International Working Group on Water Reactor Fuel Performance and Technology (IWGFPT) recommended that the Agency should hold a second Specialists' Meeting on 'Power Ramping and Cycling Behaviour of Water Reactor Fuel'. As research activities related to power ramping and cycling of water reactor fuel have been pursued vigorously, it was the objective of this meeting to review and discuss today's State of the Art and current understanding of water reactor fuel behaviour related to this these. Emphasis should be on practical experience and experimental investigations. The meeting was organised in five sessions: Power ramping and power cycling programs in power and and research reactors; Experimental methods; Power ramping and cycling results; Investigations and results of separate effects, especially related to PCI, defect mechanism, mechanical response, fuel design, and specially related to fission gas release; Operational strategies, recommendations and economic implications. The session chairmen, together with the speakers, prepared and presented reports with summary, conclusions and recommendations of the individual sessions. These reports are added to this summary report.

  17. IAEA specialists' meeting on power ramping and cycling behaviour of water reactor fuel. Summary report

    International Nuclear Information System (INIS)

    1983-06-01

    At its fourth Annual Meeting, the IAEA International Working Group on Water Reactor Fuel Performance and Technology (IWGFPT) recommended that the Agency should hold a second Specialists' Meeting on 'Power Ramping and Cycling Behaviour of Water Reactor Fuel'. As research activities related to power ramping and cycling of water reactor fuel have been pursued vigorously, it was the objective of this meeting to review and discuss today's State of the Art and current understanding of water reactor fuel behaviour related to this these. Emphasis should be on practical experience and experimental investigations. The meeting was organised in five sessions: Power ramping and power cycling programs in power and and research reactors; Experimental methods; Power ramping and cycling results; Investigations and results of separate effects, especially related to PCI, defect mechanism, mechanical response, fuel design, and specially related to fission gas release; Operational strategies, recommendations and economic implications. The session chairmen, together with the speakers, prepared and presented reports with summary, conclusions and recommendations of the individual sessions. These reports are added to this summary report

  18. Power ramping test in the JMTR for PCI study of water reactor fuel

    International Nuclear Information System (INIS)

    Nakata, H.; Kanbara, M.; Ichikawa, M.

    1984-01-01

    Power ramping test is essential for PCI study of water reactor fuel. Boiling water capsules have been used for the tests in the JMTR. Heat generation of fuel rod in the capsule can be changed by the He-3 power control facility during reactor operation. Four specially designed fuel rods have been ramped to about 41-43 kW/m; two of them have small gaps filled with iodine, the other two are equipped with centerline temperature thermocouple. Fuel rod elongation detector is equipped to each capsule. For the fuel rods with small gap, unique contraction followed by ordinary fuel relaxation behaviour was observed right after the fast ramping. None of them failed. Future programme includes a series of tests of fuel rods irradiated in the high-pressure water loop at the JMTR and a verification test of remedy fuel which allows daily-load-following operation of BWRs. (author)

  19. Prospects of power ramping and cycling supervision in Finnish power reactors

    Energy Technology Data Exchange (ETDEWEB)

    Antila, M; Kaikkonen, H T [Imatran Voima Oy, Helsinki (Finland); Mannola, E [Teollisuuden Voima Oy Industries Kraft Ab, Helsinki (Finland)

    1983-06-01

    Since 1977 2x440 MWe PWR and 2x660 MWe BWR nuclear power has been taken in operation in Finland, which until the middle of 1982 has given favourable fuel operating experiences from 10 reactor years. This paper describes the core supervision systems of the plants especially from the viewpoint of ramp surveillance and the potentials and needs to improve the supervision capability to meet the future needs in case more load follow operation is required. As a special feature for Imatran Voima is the demand of general basic understanding of the behaviour of Loviisa reactors' fuel in different operating conditions. A possibility to investigate the fuel seem to be power cycling tests in Loviisa reactors. (author)

  20. Prospects of power ramping and cycling supervision in Finnish power reactors

    International Nuclear Information System (INIS)

    Antila, M.; Kaikkonen, H.T.; Mannola, E.

    1983-01-01

    Since 1977 2x440 MWe PWR and 2x660 MWe BWR nuclear power has been taken in operation in Finland, which until the middle of 1982 has given favourable fuel operating experiences from 10 reactor years. This paper describes the core supervision systems of the plants especially from the viewpoint of ramp surveillance and the potentials and needs to improve the supervision capability to meet the future needs in case more load follow operation is required. As a special feature for Imatran Voima is the demand of general basic understanding of the behaviour of Loviisa reactors' fuel in different operating conditions. A possibility to investigate the fuel seem to be power cycling tests in Loviisa reactors. (author)

  1. Operational experiences of the spallation neutron source superconducting linac and power ramp-up

    International Nuclear Information System (INIS)

    Kim, Sang-Ho

    2009-01-01

    The spallation neutron source (SNS) is a second generation pulsed neutron source and designed to provide a 1-GeV, 1.44-MW proton beam to a mercury target for neutron production. Since the commissioning of the accelerator complex in 2006, the SNS has started its operation for neutron production and beam power ramp-up has been in progress toward the design goal. All subsystems of the SNS were designed and developed for substantial improvements compared to existing accelerators because the design beam power is almost an order of magnitude higher compared to existing neutron facilities and the achievable neutron scattering performance will exceed present sources by more than a factor of 20 to 100. In this paper, the operational experiences with the SNS Superconducting Linac (SCL), Power Ramp-up Plan to reach the design goal and the Power Upgrade Plan (PUP) will be presented including machine, subsystem and beam related issues.

  2. Critical heat flux phenomena in flow boiling during step wise and ramp wise power transients

    International Nuclear Information System (INIS)

    Celata, G.P.; Cumo, M.; D'Annibale, F.; Farello, G.E.; Abou Said, S.

    1987-01-01

    The present paper deals with the results of an experimental investigation of the forced flow critical heat flux during power transients in a vertically heated channel. Experiments were carried out with a Refrigerant-12 1oop employing a circular test section which was electrically and uniformly heated. The power transients were performed with the step-wise and ramp-wise increase of the power to the test section. The test parameters included several values of the initial power (before the transient) and the final power (at the end of the transient) in the case of step-wise transients and the slope of the ramp in the case of ramp-wise transients. The pressure and specific mass flow rate, which were kept constant during the power transient,were varied from 1.2 to 2.7 MPa and 850 to 1500 Kg/sm 2 , respectively. Correlations of the experimental data for the time-to-crisis in terms of the independent parameters of the system are also proposed and verified for different values of pressure,mass flow rate, and inlet subcooling

  3. Magnet power supply system for the ALS storage ring and booster

    International Nuclear Information System (INIS)

    Jackson, L.T.; Luchini, K.; Lutz, I.

    1993-05-01

    The Magnet Power Supply System is described by specification, design, hardware, and operating experience. A unique system for the one Hz, 1.5 GeV Booster, where the wideband QF and QD power supplies track the dipole current to within 0.1% at injection will be detailed. AC distribution system considerations related to inverting the stored energy of the booster magnet back into power grid will be discussed. The rational for linear correctors and individual quad supplies (225 total units) will be placed within the context of the storage-ring requirements

  4. Software environment and configuration for the DSP controlled NSLS booster power supplies

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second by means of the installation of new dipole, quadrupole, and sextupole power supplies. The control system of these power supplies employs general purpose digital signal processing modules, and therefore, software support is required. This paper outlines the development system configuration, and the software environment

  5. Review of power ramp irradiations with different pellet L/D ratios and thicknesses of CANLUB layers

    International Nuclear Information System (INIS)

    2009-01-01

    Power ramps in fuel during normal operation can result in Stress Corrosion Cracking (SCC) failures. Experimental evidence shows that pellets with smaller L/D ratios produce smaller circumferential ridges at pellet interface, the location where power ramps failures commonly occur. This may reduce the power ramp damage to the sheath, thereby improving the ability of the fuel sheath to withstand SCC. CANLUB coatings have demonstrated beneficial effects with respect to SCC. It is speculated that the coating acts as a chemical barrier by interacts with the corrosive fission products reducing the amount of corrosive species to reach susceptible areas of the sheath surface. This reduced concentration of corrosive products may enable the sheath to resist higher levels of incremental stresses/strains and therefore survive severe power-ramps. This work focuses on the review of experimental information that substantiates the effect of pellets with lower L/D ratios and thicker CANLUB layers on SCC sheath failures. (author)

  6. Elements of the system for RF power input into linear accelerator-injector for booster

    International Nuclear Information System (INIS)

    Mazurov, E.V.; Mal'tsev, I.G.; Shalashov, I.M.

    1981-01-01

    The elements of the original system for RF power input into 30 MeV linear accelerator-injector for the IHEP proton synchrotron booster are considered. A 3 dB coaxial directional coupler (T-bridge) is describedd. The characteristics of the bridge containing elements and the parameters of ballast matched load are given [ru

  7. Influence of the hold period on the fuel rod behaviour during a power ramp

    International Nuclear Information System (INIS)

    Bourreau, S.; Lansiart, S.; Couffin, P.; Verdeau, C.; Decroix, G.M.; Grandjean, M.-C.; Hugot, H.; Mermaz, F.; Van Schel, E.

    2000-01-01

    This paper presents three examples of power ramp tests performed in the OSIRIS experimental reactor, located at Saclay (France). The rods tested during these experiments stem from the same segmented 'mother' rod, pre-irradiated for two cycles in a French PWR. They underwent very similar power transient conditions, except for the hold time at Ramp Terminal Level (RTL) - respectively 41.5 kW/m (J12/2), 40.7 kW/m (J12/4) and 39.5 kW/m (J12/5) for RTL, but zero (J12/2), 16 minutes (J12/4) and 12 hours (J12/5) for the hold time at RTL. No failure was detected for any of the three experiments despite the relatively high mechanical stress applied to the cladding in the case of J12/2. Moreover, although no hold time was maintained at RTL, a permanent deformation clearly appeared on the clad during the power transient. An analysis of the cladding deformation has also been undertaken concerning the J12/2, J12/4 and J12/5 experiments. This study was realized by carrying out post-calculations of the three experiments with a 2D fuel modelling code using the finite element method. The computations satisfactorily reproduce the influence of hold time on the cladding deformation during the power transients, especially for the J12/2 and J12/4 experiments with hold times enclosing the failure times experimentally observed for power ramp tests. For the hold time of 12 hours, the micrographic observations of the fuel, compared to the case of the 16 minutes hold time, support the hypothesis of weak but noticeable gaseous swelling. (author)

  8. Power ramp rate capabilities of a 5 kW proton exchange membrane fuel cell system with discrete ejector control

    Science.gov (United States)

    Nikiforow, K.; Pennanen, J.; Ihonen, J.; Uski, S.; Koski, P.

    2018-03-01

    The power ramp rate capabilities of a 5 kW proton exchange membrane fuel cell (PEMFC) system are studied theoretically and experimentally for grid support service applications. The fuel supply is implemented with a fixed-geometry ejector and a discrete control solution without any anode-side pressure fluctuation suppression methods. We show that the stack power can be ramped up from 2.0 kW to 4.0 kW with adequate fuel supply and low anode pressure fluctuations within only 0.1 s. The air supply is implemented with a centrifugal blower. Air supply ramp rates are studied with a power increase executed within 1 and 0.2 s after the request, the time dictated by grid support service requirements in Finland and the UK. We show that a power ramp-up from 2.0 kW to 3.7 kW is achieved within 1 s with an initial air stoichiometry of 2.5 and within 0.2 s with an initial air stoichiometry of 7.0. We also show that the timing of the power ramp-up affects the achieved ancillary power capacity. This work demonstrates that hydrogen fueled and ejector-based PEMFC systems can provide a significant amount of power in less than 1 s and provide valuable ancillary power capacity for grid support services.

  9. Wind Power Ramp Events Prediction with Hybrid Machine Learning Regression Techniques and Reanalysis Data

    Directory of Open Access Journals (Sweden)

    Laura Cornejo-Bueno

    2017-11-01

    Full Text Available Wind Power Ramp Events (WPREs are large fluctuations of wind power in a short time interval, which lead to strong, undesirable variations in the electric power produced by a wind farm. Its accurate prediction is important in the effort of efficiently integrating wind energy in the electric system, without affecting considerably its stability, robustness and resilience. In this paper, we tackle the problem of predicting WPREs by applying Machine Learning (ML regression techniques. Our approach consists of using variables from atmospheric reanalysis data as predictive inputs for the learning machine, which opens the possibility of hybridizing numerical-physical weather models with ML techniques for WPREs prediction in real systems. Specifically, we have explored the feasibility of a number of state-of-the-art ML regression techniques, such as support vector regression, artificial neural networks (multi-layer perceptrons and extreme learning machines and Gaussian processes to solve the problem. Furthermore, the ERA-Interim reanalysis from the European Center for Medium-Range Weather Forecasts is the one used in this paper because of its accuracy and high resolution (in both spatial and temporal domains. Aiming at validating the feasibility of our predicting approach, we have carried out an extensive experimental work using real data from three wind farms in Spain, discussing the performance of the different ML regression tested in this wind power ramp event prediction problem.

  10. Power ramping, cycling and load following behaviour of water reactor fuel

    International Nuclear Information System (INIS)

    1988-05-01

    The present meeting was scheduled by the International Atomic Energy Agency upon proposal of the Members of the International Working Group on Water Reactor Fuel Performance and Technology. Sixty-three participants representing 15 countries and one international organization attended the meeting. Twenty papers were presented during three technical sessions, followed by panel discussions which allowed to formulate the conclusions of the meeting and recommendations to the Agency. The objective of this Technical Committee Meeting is to review the ''State-of-the-Art'', make critical comments and recommendations with the aim of improving fuel reliability and assure integrity of the cladding and core materials when subjected to ramping and cycling sequences. The Meeting was organized in three sessions: Session 1. ''Mechanical Behaviour and Fission Gas Release'' (7 papers); Session 2. ''Power Ramping and Power Cycling Demonstration Programmes in Research Reactors'' (5 papers); Session 3. ''Fuel Behaviour in Power Reactors'' (9 papers). Between the sessions, the session chairmen, together with the speakers, prepared and presented reports with summary, conclusions and recommendations of the individual sessions. These reports are added to this summary report. A separate abstract was prepared for each of these 21 presentations. Refs, figs and tabs

  11. Design criteria and candidate electrical power systems for a reusable Space Shuttle booster.

    Science.gov (United States)

    Merrifield, D. V.

    1972-01-01

    This paper presents the results of a preliminary study to establish electrical power requirements, investigate candidate power sources, and select a representative power generation concept for the NASA Space Shuttle booster stage. Design guidelines and system performance requirements are established. Candidate power sources and combinations thereof are defined and weight estimates made. The selected power source concept utilizes secondary silver-zinc batteries, engine-driven alternators with constant speed drive, and an airbreathing gas turbine. The need for cost optimization, within safety, reliability, and performance constraints, is emphasized as being the most important criteria in design of the final system.

  12. NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

    Science.gov (United States)

    Priskos, Alex

    2016-01-01

    NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant

  13. FEMAXI-7 analysis on behavior of medium and high burnup BWR fuels during base-irradiation and power ramp

    Energy Technology Data Exchange (ETDEWEB)

    Ogiyanagi, Jin, E-mail: ohgiyanagi.jin@jaea.go.jp [Japan Atomic Energy Agency, 2-4 Shirane, Shirakata, Tokai-mura, Naka-gun, Ibaraki 319-1195 (Japan); Hanawa, Satoshi; Suzuki, Motoe; Nagase, Fumihisa [Japan Atomic Energy Agency, 2-4 Shirane, Shirakata, Tokai-mura, Naka-gun, Ibaraki 319-1195 (Japan)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer Two power ramp experiments of BWR fuels were analyzed by FEMAXI-7 code. Black-Right-Pointing-Pointer Calculated FGR and cladding deformation showed reasonable agreement with PIE data. Black-Right-Pointing-Pointer High temperature FGR could be predicted by the enhanced Turnbull FG diffusion constant. Black-Right-Pointing-Pointer Local PCMI model in the code could reasonably predict cladding ridging deformation. - Abstract: Irradiation behavior of medium and high burnup BWR fuels during base-irradiation and subsequent power ramp test is analyzed by a fuel performance code FEMAXI-7. The code has a 1.5-D cylindrical geometry (4 axial segments) to have a coupled solution of thermal analysis and FEM mechanical analysis. Two kinds of target fuels are selected; one was subjected to a power ramp test in the DR3 reactor at RISO after the base-irradiation in a commercial BWR, and the other was subjected to the power ramp test in the DR3 reactor after the base-irradiation in the Halden boiling water reactor. The calculated values such as fission gas release after the base-irradiation and a cladding diameter profile before and after the ramp test show a reasonable agreement with measured data. In addition, the calculated ridging deformation of the cladding before and after the ramp test, which is obtained by using a local pellet-cladding mechanical interaction (PCMI) analysis geometry in FEMAXI-7, is compared with the measured data, and it is found that the FEMAXI-7 code is applicable to the local PCMI analysis of medium and high burnup rods under normal operation and power ramp conditions.

  14. Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    2015-10-19

    The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

  15. Energy Storage Requirements for PV Power Ramp Rate Control in Northern Europe

    Directory of Open Access Journals (Sweden)

    Julius Schnabel

    2016-01-01

    Full Text Available Photovoltaic (PV generators suffer from fluctuating output power due to the highly fluctuating primary energy source. With significant PV penetration, these fluctuations can lead to power system instability and power quality problems. The use of energy storage systems as fluctuation compensators has been proposed as means to mitigate these problems. In this paper, the behavior of PV power fluctuations in Northern European climatic conditions and requirements for sizing the energy storage systems to compensate them have been investigated and compared to similar studies done in Southern European climate. These investigations have been performed through simulations that utilize measurements from the Tampere University of Technology solar PV power station research plant in Finland. An enhanced energy storage charging control strategy has been developed and tested. Energy storage capacity, power, and cycling requirements have been derived for different PV generator sizes and power ramp rate requirements. The developed control strategy leads to lesser performance requirements for the energy storage systems compared to the methods presented earlier. Further, some differences on the operation of PV generators in Northern and Southern European climates have been detected.

  16. Methods for acquiring data in power ramping experiments with WWER fuel rods at high burnup

    Energy Technology Data Exchange (ETDEWEB)

    Bobrov, S N; Grachev, A F; Ovchinnikov, V A; Poliakov, I S; Matveev, N P [Research Inst. of Atomic Reactors, Dimitrovgrad (Russian Federation); Novikov, V V [Institute of Inorganic Materials, Moscow (Russian Federation)

    1997-08-01

    A programme on in-pile test which involve fuel burnup up to 60 MWd/kg and up to 12 fuel rods in the experimental rig is considered. Testing methods with reference to the MIR-M1 reactor are reported. Power ramping regime can be realized either by an increase of the total reactor capacity or by displacement of the nearest to the experimental cell control rods or by combination of these two ways. A total thermal capacity of the fuel rod cluster is determined by means of the thermal balance technique. The thermal capacity of each separate fuel rod can be estimated from the distribution of their relative activity within the accuracy range 5-10%. The important condition for this procedure is to keep the initial distribution of the fuel rod heating during power ramping. Means of instrumentation are described. They are standard detectors of loop facilities and transducers installed both in the irradiation rigs and fuel rods. Different ways of processing data on the fuel rod loss of integrity are reported. When the time of fuel rod loss of tightness is placed in correspondence with its capacity, processing can be made either on the maximum fuel rod heat load or on that at crack location. The information acquired in the experiments on the burnup values, heat rating distribution, kinetics of fission product gas emission, fuel rod elongation, fuel rod diameter changes, crack availability and fission products migration is used for the development and verification of calculation codes. (author). 1 ref., 4 figs, 1 tab.

  17. Booster main magnet power supply, present operation and potential future upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

    2011-03-28

    The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

  18. Determination of allowable ramp power levels to maintain the mechanical integrity for 14x14, 16x16 and 17x17 KOFAs

    International Nuclear Information System (INIS)

    Lee, Chan Bok; Kim, Ki Hang; Kim, Kyu Tae

    1991-11-01

    Transient behavior of the fuel rods with various rod power histories for 17x17 KOFA fuels has been calculated and evaluated, and sensitivity analyses of the key parameters such as rod power history before ramp, fast neutron flux and cycle length have also been performed. Results show that cladding strain is more limiting in determining the allowable ramp power level than fuel centerline temperature, and neutron flux has greatest influence on fuel transient behavior among rod power history before ramp, fast neutron flux and cycle length. Based upon the above results, allowable ramp power levels versus burnup for 14x14, 16x16 and 17x17 KOFA fuels were determined for the rods with different initial power levels of F xy = 0.6, 0.8, 1.0 and 1.2, which shows that the rod with lower initial power level gives lower allowable ramp power level. It can be said, therefore, that if the ramp power level of the rod at certain initial power level and burnup is less than the corresponding allowable ramp power level, the transient behavior of the rod satisfy the fuel rod design criteria. (Author)

  19. Third SCIP modeling workshop. Beneficial impact of slow power ramp on PCI performance

    International Nuclear Information System (INIS)

    Arimescu, V.I.; Vallejo, I.; Karlsson, J.

    2014-01-01

    The paper presents the Third SCIP Modeling Workshop (MWS) that was organized to investigate the PCI mitigating effects of lowering the ramp rate. To that end, the Super Ramp-Extension BWR low ramp-rate subprogram of Studsvik's International Super-Ramp (SR) Program, comprising 8 tests, was used together with a set of SCIP single-step and staircase ramps. The modeling exercise was joined by 11 participants using 10 fuel performance codes from industry, research and regulatory organizations. The paper succinctly presents both the areas where reasonable agreement was achieved, as well as the more important differences. Especially, the predicted cladding stresses have been found to differ significantly and some fuel code groupings were identified. Preliminary conclusions are succinctly presented, the highlight being that pure mechanical effects do not seem to fully explain the slow ramps' benefits - the competition between the oxide formation and healing and the SCC-aggressive agent chemical attack could be an important dynamic factor contributing to slow ramp benefits. (author)

  20. Operational status of the AGS Booster Main Ring Magnet Power Supply

    International Nuclear Information System (INIS)

    Soukas, A.; Bannon, M.; Geller, J.; McNerney, A.J.; Sandberg, J.; Toldo, F.; Zhang, S.Y.

    1992-01-01

    The Booster is a multipurpose accelerator interposed between a 200 MeV linac, a pair of 15 MV Tandem Van deGraaf accelerators, and the AGS. It can operate on slow cycles of 0.3 Hertz pulse repetition frequency up to a maximum of 7.5 Hertz. The different cycles, from long front porches for long injection or accumulation periods or flattops for slow extraction, to normal fast extraction cycles, accommodate protons, heavy ions (h.i.) and polarized protons. One of the systems enabling the flexible Booster operation is the Main Ring Magnet Power Supply (MRPS) system. It consist of a series connection of six, 1000 volt, multiphase rectifiers together with by pass switches. Two of the six operate at currents up to 6 kA and the rest up to 3 kA. All bypass switches are rated for 6 kA. The system is equipped with passive, damped LCRC filters as well as an active transformer coupled correction system. The MRPS is connected directly to the Long Island 69 Kv bus via a dedicated 20 MVA transformer. The choice of a series of modules enables the very flexible cycle generation and at the same time minimizes the deleterious effects of power factor and harmonics on the ac lines

  1. Fabrication of a CANFLEX-RU designed bundle for power ramp irradiation test in NRU

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Moon Sung

    2000-11-01

    The BDL-443 CANFLEX-RU bundle AKW was fabricated at Korea Atomic Energy Research Institute (KAERI) for power ramp irradiation testing in NRU reactor. The bundle was fabricated with IDR and ADU fuel pellets in adjacent elements and contains fuel pellets enriched to 1.65 wt% {sup 235}U in the outer and intermediate rings and also contains pellets enriched to 2.00 wt% {sup 235}U in the inner ring. This bundle does not have a center element to allow for insertion on a hanger bar. KAERI produced the IDR pellets with the IDR-source UO{sub 2} powder supplied by BNFL. ADU pellets were fabricated and supplied by AECL. Bundle kits (Zircaloy-4 end plates, end plugs, and sheaths with brazed appendages) manufactured at KAERI earlier in 1996 were used for the fabrication of the bundle. The CANFLEX bundle was fabricated successfully at KAERI according to the QA provisions specified in references and as per relevant KAERI drawings and technical specification. This report covers the fabrication activities performed at KAERI. Fabrication processes performed at AECL will be documented in a separate report.

  2. Fabrication of a CANFLEX-RU designed bundle for power ramp irradiation test in NRU

    International Nuclear Information System (INIS)

    Cho, Moon Sung

    2000-11-01

    The BDL-443 CANFLEX-RU bundle AKW was fabricated at Korea Atomic Energy Research Institute (KAERI) for power ramp irradiation testing in NRU reactor. The bundle was fabricated with IDR and ADU fuel pellets in adjacent elements and contains fuel pellets enriched to 1.65 wt% 235 U in the outer and intermediate rings and also contains pellets enriched to 2.00 wt% 235 U in the inner ring. This bundle does not have a center element to allow for insertion on a hanger bar. KAERI produced the IDR pellets with the IDR-source UO 2 powder supplied by BNFL. ADU pellets were fabricated and supplied by AECL. Bundle kits (Zircaloy-4 end plates, end plugs, and sheaths with brazed appendages) manufactured at KAERI earlier in 1996 were used for the fabrication of the bundle. The CANFLEX bundle was fabricated successfully at KAERI according to the QA provisions specified in references and as per relevant KAERI drawings and technical specification. This report covers the fabrication activities performed at KAERI. Fabrication processes performed at AECL will be documented in a separate report

  3. Design and development of microcontroller based programmable ramp generator for AC-DC converter for simulating decay power transient in experimental facility for nuclear power plants

    International Nuclear Information System (INIS)

    Srivastava, Gaurava Deep; Kulkarni, R.D.

    2015-01-01

    In nuclear power plants, fuel is subjected to a wide range of power and temperature transients during normal and abnormal conditions. The reactor setback and step-back power pattern, fast temperature profile occurred during Loss of Coolant Accident and decay power followed by shutdown of power plant are the typical transients in nuclear power plant. For a variety of reactor engineering and reactor safety related study, one needs to simulate these transients in experimental facility. In experimental facilities, high response AC-DC converters are used to handle these power and temperature transients safely in a controlled manner for generating a database which is utilized for design of thermal hydraulic system, development of computer codes, study of reliability of reactor safety system, etc. for nuclear power plants. The paper presents the methodology developed for simulating the typical reactor decay power transient in an experimental facility. The design and simulation of AC-DC power electronic converter of 3 MW capacity is also presented. The microcontroller based programmable ramp generator is designed and hardware implemented for feeding reference voltage to the closed loop control system of AC-DC converter for obtaining the decay power profile at the converter output. The typical decay power transient of the nuclear power plant is divided into several small power ramps for simulating the transient. The signal corresponding to each power ramp is generated by programmable ramp generator and fed to the comparator for generating control signal for the converter. The actual decay power transient obtained from the converter is compared with the theoretical decay power transient. (author)

  4. Metallographic examination of (uth) O2 and UO2 fuel tested in power ramp conditions in triga reactor

    International Nuclear Information System (INIS)

    Ioncescu, M.; Uta, O.

    2015-01-01

    The purpose of this paper is to determine the behavior of two fuel experimental elements (EC1 and EC2), by destructive post-irradiation examination. The fuel elements were mounted inside a pattern port, one in extension of the other and irradiated in power ramp conditions in order to check their behavior. Fuel element 1 (EC1) contains (UTh)O''2 pellet, and other one (EC2) UO''2 pellet. The results of destructive post-irradiation examination are evidenced by metallographic and ceramographic analyses. The data obtained from the post-irradiation examinations are used, first to confirm the security, reliability and nuclear fuel performance, and second, for the development of CANDU fuel. The results obtained by destructive examinations regarding the integrity, sheath hydrating and oxidation as well as the structural modifications are typical for fuel elements tested in power ramp conditions. (authors)

  5. Does a booster intervention augment the preventive effects of an abbreviated version of the coping power program for aggressive children?

    Science.gov (United States)

    Lochman, John E; Baden, Rachel E; Boxmeyer, Caroline L; Powell, Nicole P; Qu, Lixin; Salekin, Karen L; Windle, Michel

    2014-01-01

    Booster interventions have been presumed to be important methods for maintaining the effects of evidence-based programs for children with behavioral problems, but there has been remarkably little empirical attention to this assumption. The present study examines the effect of a child-oriented booster preventive intervention with children who had previously received an abbreviated version (24 child sessions, 10 parent sessions) of the Coping Power targeted prevention program. Two hundred and forty-one children (152 boys, 89 girls) were screened as having moderate to high levels of aggressive behavior in 4th grade, then half were randomly assigned to receive the abbreviated Coping Power program in 5th grade, and half of the preventive intervention children were then randomly assigned to a Booster condition in 6th grade. The Booster sessions consisted of brief monthly individual contacts, and were primarily with the children. Five assessments across 4 years were collected from teachers, providing a three-year follow-up for all children who participated in the project. Results indicated that the abbreviated Coping Power program (one-third shorter than the full intervention) had long-term effects in reducing children's externalizing problem behaviors, proactive and reactive aggression, impulsivity traits and callous-unemotional traits. The Booster intervention did not augment these prevention effects. These findings indicate that a briefer and more readily disseminated form of an evidence-based targeted preventive intervention was effective. The findings have potential implications for policy and guidelines about possible intervention length and booster interventions.

  6. Modelling of pellet cladding interaction during power ramps in PWR rods by means of Transuranus fuel rod analysis code

    International Nuclear Information System (INIS)

    Di Marcello, V.; Luzzi, L.

    2008-01-01

    Pellet-cladding interaction (PCI) in PWR type rods subjected to power ramps was analysed by means of TRANSURANUS (TU) fuel rod performance code. PCI phenomena depend on the fuel power history - i.e. by several irradiation and thermal induced phenomena occurring in the fuel rod and mutually interacting during its life in reactor - and may become critical for cladding integrity under accidental conditions. Ten test fuel rods, whose power histories and post irradiation experiment (PIE) data were available from the OECD/NEA-IAEA International Fuel Performance Experiment (UTE) database through the Studsvik SUPER-RAMP Project, were simulated by TRANSURANUS. During a power ramp pellet gaseous swelling can be inhibited by cladding pressure and can be over-predicted by a normal operation swelling model. This phenomenon was simulated by a new formulation of a fuel swelling model already available in the code, in order to consider hot pressing of inter-granular -fuel porosity due to the high hydrostatic stress resulting from PCI: it was found that TRANSURANUS, as a result of the proposed swelling formulation as well as of the accurate modelling of the other phenomena occurring during irradiation, gives correct predictions on PCI induced fuel rod failures. In addition, PCI failure threshold identified by TRANSURANUS was compared with the technological limits known in literature: the possibility of relaxing these limits for low burn-up values and the preponderance of the European fuel rod design in front of PCI emerged from TU analyses. Finally, a good agreement was found between TU evaluations and PIE data, with regard to fission gas release, fuel grain growth, and creep, corrosion and elongation of the cladding. (authors)

  7. Analysis of power ramp rate and minimum power controllability of the MMS model for a plant dynamics analysis of a Prototype SFR

    International Nuclear Information System (INIS)

    Kim, Eui Kwang; Kim, Dehee; Joo, Hyungkook; Lee, Taeho

    2014-01-01

    A full plant dynamic model was developed for a prototype SFR using the Modular Modeling System (MMS). It includes the modeling of various subsystems such as the neutronics, primary and intermediate sodium systems of the NSSS, steam and water systems of the BOP, BOP controls, and the supervisory plant controls. The NSSS model is subdivided into component models, such as a Core, IHXs, Pumps, SGs, and the rest of the NSSS loop model. The BOP model is subdivided into a steam subsystem, feedwater subsystem, and preheater subsystem. Plant transient tests were performed to study the operational considerations. It includes varying the power ramp rate and studying the controllability at minimum power. Plant transient tests were performed to study operational considerations by using the MMS model for a prototype SFR. It includes varying the power ramp rate, studying the controllability at the minimum power set point. At a power ramp rate of higher than 2%, the steam temperature has a large deviation from the target. As the power set point decreases, the PHTS hot leg temperature and steam temperature tend to have higher deviations. After further refinement of the MMS model, it can be useful for developing the plant operation logics of the prototype SFR

  8. Fuel rod failure due to marked diametral expansion and fuel rod collapse occurred in the HBWR power ramp experiment

    International Nuclear Information System (INIS)

    Yanagisawa, Kazuaki

    1985-12-01

    In the power ramp experiment with the BWR type light water loop at the HBWR, the two pre-irradiated fuel rods caused an unexpected pellet-cladding interaction (PCI). One occurred in the fuel rod with small gap of 0.10 mm, which was pre-irradiated up to the burn-up of 14 MWd/kgU. At high power, the diameter of the rod was increased markedly without accompanying significant axial elongation. The other occurred in the rod with a large gap of 0.23 mm, which was pre-irradiated up to the burn-up of 8 MWd/kgU. The diameter of the rod collapsed during a diameter measurement at the maximum power level. The causes of those were investigated in the present study by evaluating in-core data obtained from equipped instruments in the experiment. It was revealed from the investigation that these behaviours were attributed to the local reduction of the coolant flow occurred in the region of a transformer in the ramp rig. The fuel cladding material is seemed to become softened due to temperature increase caused by the local reduction of the coolant flow, and collapsed by the coolant pressure, either locally or wholly depending on the rod diametral gap existed. (author)

  9. Dynamic compensation of the Silver self-powered neutron detector in the ramp program at the OSIRIS reactor

    International Nuclear Information System (INIS)

    Moulin, D.J.

    1994-01-01

    The Silver self-powered neutron detector (SPND) is a common detector used in the ramp program at the OSIRIS reactor. The Silver SPND signal is a reference during steady states, but its response is too slow for monitoring transient tests. In order to compensate for the inherent time delay a mathematical processing method of the Silver SPND signal was developed. Based on a convolution-type resolution of the kinetics equations, a dynamic compensation algorithm can be used for transient conditions as well as steady state conditions. A computer program reconstructs, in real-time, the dynamic neutron flux sensed by the Silver detector from the current measured between the emitter and the collector of the SPND. Although this method decreases slightly the signal-to-noise ratio, it maintains the SPND's characteristics and reduces the response time from about 10 minutes to less than 4 seconds for a step change in flux. This provides for prompt and accurate measurement of fuel rod power during ramp experiments in the OSIRIS reactor. This development makes the Silver SPND very suitable for many on-line monitoring applications

  10. Overview on international experimental programmes on power ramping and fission gas release

    International Nuclear Information System (INIS)

    Knaab, H.; Lang, P.M.; Mogard, H.

    1983-01-01

    During the last years a number of internationally sponsored experimental programmes were initiated to study the LWR fuel behaviour during ramping and fission gas release at higher burnup levels. Common interest and the limited availability of experimental facilities and appropriate test fuel rods have led to valuable cooperation of many organizations throughout the nuclear community. These programmes are performed by the experimental staff from research centers with their experimental facilities. Fuel vendors and several utilities contribute by supply and irradiation of test fuel rods. The aim of this paper is to provide a synopsis of the following programmes: Studsvik Projects: Interramp, Overramp, Superramp, Demoramp I and II; Petten, High Burnup PWR Ramp Test Programme; Mol, Tribulation Programme; BNWL, High Burnup Effects Programme; Risoe Fission Gas Project; Related tasks within the OECD Halden Reactor Project. The objectives of the programme, their work scope and main results will be summarized on the basis of presently available information. An outlook to future proposed programmes will be given. (author)

  11. Overview on international experimental programmes on power ramping and fission gas release

    International Nuclear Information System (INIS)

    Knaab, H.; Lang, P.M.

    1985-01-01

    During the last few years a number of internationally sponsored experimental programmes have been initiated to study LWR fuel behaviour during ramping and fission gas release at high burnup levels. Common interest and the limited availability of experimental facilities and appropriate test fuel rods have led to valuable cooperation between many organizations throughout the nuclear community. These programmes are carried out by experienced staff from research centres using the centres' experimental facilities. Fuel vendors and several utilities contribute by supplying and irradiating the test fuel rods. The aim of this paper is to provide a synopsis of the following programmes: (a) Studsvik Projects: Interramp, Demoramp I and II, Overramp, Superramp; (b) Petten, High Burnup PWR Ramp Test Programme; (c) Mol, Tribulation Programme; (d) BNWL, High Burnup Effects Programme; (e) Riso Fission Gas Project; and (f) related tasks within the OECD Halden Reactor Project. The objectives of the programmes, their scope and the main results will be summarized. An overview of proposed future programmes will be given. (author)

  12. Responses of platinum, vanadium and cobalt self-powered flux detectors near simulated booster rods in a ZED-2 mockup of a Bruce reactor core

    International Nuclear Information System (INIS)

    French, P.M.; Shields, R.B.; Kroon, J.C.

    1978-02-01

    The static responses of Pt, V and Co self-powered detectors have been compared with copper-foil neutron activation profiles in reference and perturbed Bruce reactor core mockups assembled in the ZED-2 test reactor at Chalk River Nuclear Laboratories. The results indicate that the normalized response of each self-powered detector is an accurate measure of the thermal-neutron flux at locations greater than one lattice pitch from either a booster rod or the core boundary. They indicate that, in the Bruce booster/detector configuration, the normalized static Pt response overestimates the neutron flux by less than 3.5% upon full booster-rod insertion. (author)

  13. A 4 MA, 500 ns pulsed power generator CQ-4 for characterization of material behaviors under ramp wave loading.

    Science.gov (United States)

    Wang, Guiji; Luo, Binqiang; Zhang, Xuping; Zhao, Jianheng; Sun, Chengwei; Tan, Fuli; Chong, Tao; Mo, Jianjun; Wu, Gang; Tao, Yanhui

    2013-01-01

    A pulsed power generator CQ-4 was developed to characterize dynamic behaviors of materials under ramp wave loading, and to launch high velocity flyer plates for shock compression and hypervelocity impact experiments of materials and structures at Institute of Fluid Physics, China Academy of Engineering Physics. CQ-4 is composed of twenty capacitor and primary discharge switch modules with total capacitance of 32 μF and rated charging voltage of 100 kV, and the storage energy is transmitted by two top and bottom parallel aluminum plates insulated by twelve layers of polyester film with total thickness of 1.2 mm. Between capacitor bank and chamber, there are 72 peaking capacitors with total capacitance of 7.2 μF and rated voltage of 120 kV in parallel, which are connected with the capacitor bank in parallel. Before the load, there is a group of seven secondary self-breaking down switches connected with the total circuit in series. The peaking capacitors and secondary switches are used to shape the discharging current waveforms. For short-circuit, the peak current of discharging can be up to 3 ~ 4 MA and rise time varies from 470 ns to 600 ns when the charging voltages of the generator are from 75 kV to 85 kV. With CQ-4 generator, some quasi-isentropic compression experiments under ramp wave loadings are done to demonstrate the ability of CQ-4 generator. And some experiments of launching high velocity flyer plates are also done on CQ-4. The experimental results show that ramp wave loading pressure of several tens of GPa on copper and aluminum samples can be realized and the velocity of aluminum flyer plate with size of 10 mm × 6 mm × 0.35 mm can be accelerated to about 11 km/s and the velocity of aluminum flyer plate with size of 10 mm × 6 mm × 0.6 mm can be up to about 9 km/s, which show that CQ-4 is a good and versatile tool to realize ramp wave loading and shock compression for shock physics.

  14. Assessment of the prediction capability of the TRANSURANUS fuel performance code on the basis of power ramp tested LWR fuel rods

    International Nuclear Information System (INIS)

    Pastore, G.; Botazzoli, P.; Di Marcello, V.; Luzzi, L.

    2009-01-01

    The present work is aimed at assessing the prediction capability of the TRANSURANUS code for the performance analysis of LWR fuel rods under power ramp conditions. The analysis refers to all the power ramp tested fuel rods belonging to the Studsvik PWR Super-Ramp and BWR Inter-Ramp Irradiation Projects, and is focused on some integral quantities (i.e., burn-up, fission gas release, cladding creep-down and failure due to pellet cladding interaction) through a systematic comparison between the code predictions and the experimental data. To this end, a suitable setup of the code is established on the basis of previous works. Besides, with reference to literature indications, a sensitivity study is carried out, which considers the 'ITU model' for fission gas burst release and modifications in the treatment of the fuel solid swelling and the cladding stress corrosion cracking. The performed analyses allow to individuate some issues, which could be useful for the future development of the code. Keywords: Light Water Reactors, Fuel Rod Performance, Power Ramps, Fission Gas Burst Release, Fuel Swelling, Pellet Cladding Interaction, Stress Corrosion Cracking

  15. The evaluation of failure stress and released amount of fission product gas of power ramped rod by fuel behaviour analysis code 'FEMAXI-III'

    International Nuclear Information System (INIS)

    Yanagisawa, Kazuaki; Fujita, Misao

    1984-01-01

    Pellet-Cladding Interaction(PCI) related in-pile failure of Zircaloy sheathed fuel rod is in general considered to be caused by combination of pellet-cladding mechanical interaction(PCMI) with fuel-cladding chemical interaction(FCCI). An understanding of a basic mechanism of PCI-related fuel failure is therefore necessary to get actual cladding hoop stress from mechanical interaction and released amounts of fission product(FP) gas of aggressive environmental agency from chemical interaction. This paper describes results of code analysis performed on fuel failure to cladding hoop stress and amounts of FP gas released under the condition associated with power ramping. Data from Halden(HBWR) and from Studsvik(R2) are used for code analysis. The fuel behaviour analysis code ''FEMAXI-III'' is used as an analytical tool. The followings are revealed from the study: (1) PCI-related fuel failure is dependent upon cladding hoop stress and released amounts of FP gas at power ramping. (2) Preliminary calculated threshold values of hoop stress and of released amounts of FP gas to PCI failure are respectively 330MPa, 10% under the Halden condition, 190MPa, 5% under the Inter ramp(BWR) condition, and 270MPa, 14% under the Over ramp(PWR) condition. The values of hoop stress calculated are almost in the similar range of those obtained from ex-reactor PCI simulated tests searched from references published. (3) The FEMAXI-III code verification is made in mechanical manner by using in-pile deformation data(diametral strain) obtained from power ramping test undertaken by JAERI. While, the code verification is made in thermal manner by using punctured FP gas data obtained from post irradiation examination performed on non-defected power ramped fuel rods. The calculations are resulted in good agreements to both, mechanical and thermal experimental data suggesting the validity of the code evaluation. (J.P.N.)

  16. LWR fuel rod testing facilities in high flux reactor (HFT) Petten for investigation of power cycling and ramping behaviour

    Energy Technology Data Exchange (ETDEWEB)

    Markgraf, J; Perry, D; Oudaert, J [Commission of the European Communities, Joint Reserach Centre, Petten Establishment, Petten (Netherlands)

    1983-06-01

    LWR fuel rod irradiation experiments are being performed in HFR's Pool Side Facility (PSF) by means of pressurized boiling water capsules (BWFC). For more than 6 years the major application of these devices has been in performing irradiation programs to investigate the power ramp behaviour of PWR and BWR rods which have been pre-irradiated in power reactors. Irradiation devices with various types of monitoring instrumentation are available, e.g. for fuel rod length, fuel stack length, fuel rod internal pressure and fuel rod central temperature measurements. The application scope covers PWR and BWR fuel rods, with burn-up levels up to 45 MWd/kg(U), max. linear heat generation rates up to 700 W/cm and simulation of constant power change rates between 0.05 and 1000 W/cm.min. The paper describes the different designs of LWR fuel rod testing facilities and associated non-destructive testing devices in use at the HFR Petten. It also addresses the new test capabilities that will become available after exchange of the HFR vessel in 1983. Furthermore it shows some typical results. (author)

  17. Beam Based RF Voltage Measurements and Longitudinal Beam Tomography at the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Bhat, C. M. [Fermilab; Bhat, S. [Fermilab

    2017-10-19

    Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two decades. Therefore, understanding the Booster in great detail is important as we continue to improve its performance. For example, it is important to know accurately the available RF power in the Booster by carrying out beam-based measurements in order to specify the needed upgrades to the Booster RF system. Since the Booster magnetic field is changing continuously measuring/calibrating the RF voltage is not a trivial task. Here, we present a beam based method for the RF voltage measurements. Data analysis is carried out using computer programs developed in Python and MATLAB. The method presented here is applicable to any RCS which do not have flat-bottom and flat-top in the acceleration magnetic ramps. We have also carried out longitudinal beam tomography at injection and extraction energies with the data used for RF voltage measurements. Beam based RF voltage measurements and beam tomography were never done before for the Fermilab Booster. The results from these investigations will be very useful in future intensity upgrades.

  18. Analog fault diagnosis based on ramping power supply current signature clusters

    NARCIS (Netherlands)

    Somayajula, S.A.S.; Sanchez-Sinencio, E.; Pineda de Gyvez, J.

    1996-01-01

    Measurement of power supply currents was found to be very useful for testing CMOS IC's because of its potential to detect a large class of manufacturing defects. However, this technique was used mainly for fault detection and was confined to digital circuits. In this paper, we present a suited

  19. A Cost-Effective Power Ramp-Rate Control Strategy for Single-Phase Two-Stage Grid-Connected Photovoltaic Systems

    DEFF Research Database (Denmark)

    Sangwongwanich, Ariya; Yang, Yongheng; Blaabjerg, Frede

    2016-01-01

    In the case of a wide-scale adoption of grid-connected Photovoltaic (PV) systems, more fluctuated power will be injected into the grid due to the intermittency of solar PV energy. A sudden change in the PV power can potentially induce grid voltage fluctuations, and thus challenge the stability......-point. Experiments conducted on a 3-kW single-phase two-stage grid-connected PV system have verified that the proposed solution can accomplish fast dynamics, high accuracy, and high robustness in the power ramp-rate control for PV systems....

  20. 47 CFR 73.3572 - Processing of TV broadcast, Class A TV broadcast, low power TV, TV translators, and TV booster...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Processing of TV broadcast, Class A TV broadcast, low power TV, TV translators, and TV booster applications. 73.3572 Section 73.3572... Rules Applicable to All Broadcast Stations § 73.3572 Processing of TV broadcast, Class A TV broadcast...

  1. The Booster

    CERN Multimedia

    1972-01-01

    Where the beams from the Booster's four rings begin to recombine, before transfer to the PS. On the left are dipoles for vertical steering, and on the right is the tank containing two septum magnets which form the first combining element.

  2. Design of the 150 kW, 46-62 MHz power amplifier for the TRIUMF KAON factory booster ring

    International Nuclear Information System (INIS)

    Kwiatkowski, S.; Enegren, T.; Poirier, R.L.

    1988-06-01

    The rf amplifiers for the KAON Factory booster ring must be capable of reactively compensating (detuning) for the injected/extracted beam load as well as providing the beam power and the cavity losses. In order to insure the stability of the rf system under heavy transient and steady state beam loading conditions it is necessary to equip the power amplifiers with fast rf feedback with sufficient gain and bandwidth to reduce the apparent Q of the rf amplifier system as seen by the beam and the other feedback loops. The maximum gain and bandwidth of such a feedback loop is limited by the propagation delay around the feedback path. To minimize the propagation delay a 2.4 kW two stage solid state driver will be used to drive the cathode of the Eimac Y567B tetrode to give an overall propagation delay less than 30 nS. The design features of the rf amplifier to meet the above conditions will be described and test results reported. (Author) (7 refs., 7 figs.)

  3. Immunity booster

    International Nuclear Information System (INIS)

    Stefanescu, Ioan; Titescu, Gheorghe; Tamaian, Radu; Haulica, Ion; Bild, Walther

    2002-01-01

    The immunity booster is, according to its patent description, microbiologically pure water with an D/(D+H) isotopic concentration of 100 ppm, with physical-chemical characteristics similar to those of distilled water. It is obtained by sterilization of a mixture of deuterium depleted water, with a 25 ppm isotopic concentration, with distilled water in a volume ratio of 4:6. Unlike natural immunity boosters (bacterial agents as Bacillus Chalmette-Guerin, Corynebacterium parvum; lipopolysaccharides; human immunoglobulin) or synthetical products (levamysol; isoprinosyne with immunostimulating action), which cause hypersensitivity and shocks, thrill, fever, sickness and the immunity complex disease, the water of 100 ppm D/(D + H) isotopic concentration is a toxicity free product. The testing for immune reaction of the immunity booster led to the following results: - an increase of cell action capacity in the first immunity shielding stage (macrophages), as evidenced by stimulation of a number of essential characterizing parameters, as well as of the phagocytosis capacity, bactericide capacity, and opsonic capacity of serum; - an increase of the number of leucocyte particularly of the granulocyte in peripheral blood, produced especially when medullar toxic agents like caryolysine are used; - it hinders the effect of lowering the number of erythrocytes in peripheral blood produced by experimentally induced chronic inflammation; - an increase of nonspecific immunity defence capacity against specific bacterial aggression of both Gram-positive bacteria (Streptococcus pneumoniae 558 ) and of the Gram-negative ones (Klebsiella pneumoniae 507 ); - an increase of immunity - stimulating activity (proinflamatory), like that of levamisole as evidenced by the test of stimulation of experimentally induced inflammation by means of carrageenan. The following advantages of the immunity booster are stressed: - it is toxicity free and side effect free; - can be orally administrated as

  4. Experimental evidence of oxygen thermo-migration in PWR UO{sub 2} fuels during power ramps using in-situ oxido-reduction indicators

    Energy Technology Data Exchange (ETDEWEB)

    Riglet-Martial, Ch., E-mail: chantal.martial@cea.fr; Sercombe, J.; Lamontagne, J.; Noirot, J.; Roure, I.; Blay, T.; Desgranges, L.

    2016-11-15

    The present study describes the in-situ electrochemical modifications which affect irradiated PWR UO{sub 2} fuels in the course of a power ramp, by means of in-situ oxido-reduction indicators such as chromium or neo-formed chemical phases. It is shown that irradiated fuels (of nominal stoichiometry close to 2.000) under temperature gradient such as that occurring during high power transients are submitted to strong oxido-reduction perturbations, owing to radial migration of oxygen from the hot center to the cold periphery of the pellet. The oxygen redistribution, similar to that encountered in Sodium Fast Reactors fuels, induces a massive reduction/precipitation of the fission products Mo, Ru, Tc and Cr (if present) in the high temperature pellet section and the formation of highly oxidized neo-formed grey phases of U{sub 4}O{sub 9} type in its cold section, of lower temperature. The parameters governing the oxidation states of UO{sub 2} fuels under power ramps are finally debated from a cross-analysis of our results and other published information. The potential chemical benefits brought by oxido-reductive additives in UO{sub 2} fuel such as chromium oxide, in connection with their oxygen buffering properties, are discussed.

  5. NSLS-II booster timing system

    International Nuclear Information System (INIS)

    Cheblakov, P.; Karnaev, S.; De Long, J.

    2012-01-01

    NSLS-II light source includes the main storage ring with beam lines and injection part consisting of 200 MeV linac, a full-energy 3 GeV booster synchrotron and two transport lines. The booster timing system is a part of NSLS-II timing system which uses hardware from MicroResearch Finland: Event Generator (EVG) and Event Receivers (EVRs). The booster timing is based on the events coming from NSLS-II EVG: 'Pre-Injection', 'Injection', 'Pre-Extraction', 'Extraction'. These events are referenced to the selected RF bucket of the storage ring and correspond to the first RF bucket of the booster. EVRs provide triggers both for the injection and the extraction pulse devices. EVRs also provide the timing of booster cycle operation and generation of events for cycle-to-cycle updates of pulsed and ramping parameters, and synchronization of the booster beam instrumentation devices. This paper describes the final design of the booster timing system. The timing system functional diagrams and block diagram are presented. (authors)

  6. Ram booster

    Science.gov (United States)

    Brand, Vance D. (Inventor); Morgan, Walter Ray (Inventor)

    2011-01-01

    The present invention is a space launch system and method to propel a payload bearing craft into earth orbit. The invention has two, or preferably, three stages. The upper stage has rocket engines capable of carrying a payload to orbit and provides the capability of releasably attaching to the lower, or preferably, middle stage. Similar to the lower stage, the middle stage is a reusable booster stage that employs all air breathing engines, is recoverable, and can be turned-around in a short time between missions.

  7. Climatological attribution of wind power ramp events in East Japan and their probabilistic forecast based on multi-model ensembles downscaled by analog ensemble using self-organizing maps

    Science.gov (United States)

    Ohba, Masamichi; Nohara, Daisuke; Kadokura, Shinji

    2016-04-01

    Severe storms or other extreme weather events can interrupt the spin of wind turbines in large scale that cause unexpected "wind ramp events". In this study, we present an application of self-organizing maps (SOMs) for climatological attribution of the wind ramp events and their probabilistic prediction. The SOM is an automatic data-mining clustering technique, which allows us to summarize a high-dimensional data space in terms of a set of reference vectors. The SOM is applied to analyze and connect the relationship between atmospheric patterns over Japan and wind power generation. SOM is employed on sea level pressure derived from the JRA55 reanalysis over the target area (Tohoku region in Japan), whereby a two-dimensional lattice of weather patterns (WPs) classified during the 1977-2013 period is obtained. To compare with the atmospheric data, the long-term wind power generation is reconstructed by using a high-resolution surface observation network AMeDAS (Automated Meteorological Data Acquisition System) in Japan. Our analysis extracts seven typical WPs, which are linked to frequent occurrences of wind ramp events. Probabilistic forecasts to wind power generation and ramps are conducted by using the obtained SOM. The probability are derived from the multiple SOM lattices based on the matching of output from TIGGE multi-model global forecast to the WPs on the lattices. Since this method effectively takes care of the empirical uncertainties from the historical data, wind power generation and ramp is probabilistically forecasted from the forecasts of global models. The predictability skill of the forecasts for the wind power generation and ramp events show the relatively good skill score under the downscaling technique. It is expected that the results of this study provides better guidance to the user community and contribute to future development of system operation model for the transmission grid operator.

  8. Technical assessment of electric heat boosters in low-temperature district heating based on combined heat and power analysis

    DEFF Research Database (Denmark)

    Cai, Hanmin; You, Shi; Wang, Jiawei

    2018-01-01

    This paper provides a technical assessment of electric heat boosters (EHBs) in low-energy districts. The analysis is based on a hypothetical district with 23 terraced single-family houses supplied by both a lowtemperature district heating (LTDH) network and a low-voltage network (LVN). Two case...

  9. Control of the neutronic and thermohydraulic conditions of power ramps in an irradiation loop for PWR fuel rod; Controle des conditions neutroniques et thermohydrauliques des rampes de puissance dans une boucle d`irradiation de combustibles de reacteur a eau pressurisee

    Energy Technology Data Exchange (ETDEWEB)

    Moulin, D J.F.

    1993-09-10

    In order to study the power transients effects on PWR fuel rod clad, ramp tests in a pressurized water loop, are carried out at OSIRIS reactor. The present thesis deals with the on-line control of the device, during power ramp and conditioning irradiation. Based on a convolution-type resolution of the kinetics equations, a dynamic compensation of the Silver self-powered neutron detector was developed. With this method, the uncertainty of the ramp end-point is lower than 1%, thus it is very suited for monitoring both transient, as well as steady state conditions. Furthermore, a thermohydraulic model of the irradiation device is described: heat transfer equations, including gamma heating in materials, are solved to obtain temperatures and thermal fluxes of steady states. Results from the model and temperature measurements of the coolant are used together for fuel power determination, in real time. The clad external temperature profile is also calculated and displayed, to improve the irradiation monitoring. (author), 51 refs., 12 annexes, 66 figs.

  10. Integrated Three-Voltage-Booster DC-DC Converter to Achieve High Voltage Gain with Leakage-Energy Recycling for PV or Fuel-Cell Power Systems

    Directory of Open Access Journals (Sweden)

    Chih-Lung Shen

    2015-09-01

    Full Text Available In this paper, an integrated three-voltage-booster DC-DC (direct current to direct current converter is proposed to achieve high voltage gain for renewable-energy generation systems. The proposed converter integrates three voltage-boosters into one power stage, which is composed of an active switch, a coupled-inductor, five diodes, and five capacitors. As compared with conventional high step-up converters, it has a lower component count. In addition, the features of leakage-energy recycling and switching loss reduction can be accomplished for conversion efficiency improvement. While the active switch is turned off, the converter can inherently clamp the voltage across power switch and suppress voltage spikes. Moreover, the reverse-recovery currents of all diodes can be alleviated by leakage inductance. A 200 W prototype operating at 100 kHz switching frequency with 36 V input and 400 V output is implemented to verify the theoretical analysis and to demonstrate the feasibility of the proposed high step-up DC-DC converter.

  11. Ramp Management in RHIC

    International Nuclear Information System (INIS)

    Kewisch, J.; Van Zeijts, J.; Peggs, S.; Satogata, T.

    1999-01-01

    In RHIC, magnets and RF cavities are controlled by Wave Form Generators (WFGs), simple real time computers which generate the set points. The WFGs are programmed to change set points from one state to another in a synchrotronized way. Such transition is called a ''Ramp'' and consists of a sequence of ''stepping stones'' which contain the set point of every WFG controlled device at a point in time. An appropriate interpolation defines the set points between these stepping stones. This report describes the implementation of the ramp system. The user interface, tools to create and modify ramps, interaction with modeling tools and measurements and correction programs are discussed

  12. A column level, low power, 1 M sample/s double ramp A/D converter for monolithic active pixel sensors in high energy physics

    International Nuclear Information System (INIS)

    Pillet, N.; Heini, S.; Hu, Y.

    2010-01-01

    Monolithic active pixel sensors (MAPS) using standard low cost CMOS technologies available from industrial manufacturers have demonstrated excellent tracking performances for minimum ionizing particles. The need for highly granular, fast, thin sensors with a full digital output drives an R and D effort, aiming to design and optimize a low power high speed A/D converter integrated at the column level. Following this main issue, a double digital ramp A/D converter has been proposed for CMOS monolithic active pixel sensors in this paper. This A/D converter responds to the constraints of size, power dissipation and precision for CMOS sensors for particle detection. It also represents a first step in order to reach the high speed of conversion needed for this kind of application. The A/D converter has a resolution of 4 bits for conversion speed of 1 M sample/s with only 264 μW of static consumption in a very particular pitch of 25 μmx900 μm.

  13. Implementation of Ramp Control in RHIC

    International Nuclear Information System (INIS)

    Kewisch, J.

    1999-01-01

    After the injection of beam into RHIC the beam energy is ramped from 10.8 GeV/u to 108 GeV/u and the beta function of the interaction points is reduced from 10 meters to 1 meter. The set points for magnet power supplies and RF cavities is changed during such ramps in concert. A system of Wave Form Generators (WFGs), interconnected by a Real Time Data Link (RTDL) and Event Link is used to control these devices. RHIC ramps use a two level system of WFGs: one transmits the beam energy and a ''pseudo time'' variable as functions of time via RTDL; the other calculates the device set points as functions of these RTDL variables. Energy scaling, saturation correction and the wiring of interaction region quadruples is performed on the second level. This report describes the configuration and implementation of the software, firmware and hardware of the RHIC ramp system

  14. Wind Plant Ramping Behavior

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Kemper, J.

    2009-12-01

    With the increasing wind penetrations, utilities and operators (ISOs) are quickly trying to understand the impacts on system operations and planning. This report focuses on ramping imapcts within the Xcel service region.

  15. Simulations Of Transverse Stacking In The NSLS-II Booster

    International Nuclear Information System (INIS)

    Fliller, R. III; Shaftan, T.

    2011-01-01

    The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster. The linac needs to deliver 15 nC in 80 - 150 bunches to the booster every minute to achieve current stability goals in the storage ring. This is a very stringent requirement that has not been demonstrated at an operating light source. We have developed a scheme to transversely stack two bunch trains in the NSLS-II booster in order to alleviate the charge requirements on the linac. This scheme has been outlined previously. In this paper we show particle tracking simulations of the tracking scheme. We show simulations of the booster ramp with a stacked beam for a variety of lattice errors and injected beam parameters. In all cases the performance of the proposed stacking method is sufficient to reduce the required charge from the linac. For this reason the injection system of the NSLS-II booster is being designed to include this feature. The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster. The injectors must provide 7.5nC in bunch trains 80-150 bunches long every minute for top off operation of the storage ring. Top off then requires that the linac deliver 15nC of charge once losses in the injector chain are taken into consideration. This is a very stringent requirement that has not been demonstrated at an operating light source. For this reason we have developed a method to transversely stack two bunch trains in the booster while maintaining the charge transport efficiency. This stacking scheme has been discussed previously. In this paper we show the simulations of the booster ramp with a single bunch train in the booster. Then we give a brief overview of the stacking scheme. Following, we show the results of stacking two bunch trains in the booster with varying beam emittances and train separations. The behavior of the beam through the ramp is examined showing that it is possible to stack two bunch trains in the booster.

  16. Tracking study of hadron collider boosters

    Energy Technology Data Exchange (ETDEWEB)

    Machida, S.; Bourianoff, G.; Huang, Y.; Mahale, N.

    1992-07-01

    A simulation code SIMPSONS (previously called 6D-TEASE T) of single- and multi-particle tracking has been developed for proton synchrotrons. The 6D phase space coordinates are calculated each time step including acceleration with an arbitrary ramping curve by integration of the rf phase. Space-charge effects are modelled by means of the Particle In Cell (PIC) method. We observed the transverse emittance growth around the injection energy of the Low Energy Booster (LEB) of the Superconducting Super Collider (SSC) with and without second harmonic rf cavities which reduce peak line density. We also employed the code to see the possible transverse emittance deterioration around the transition energy in the Medium Energy Booster (MEB) and to estimate the emittance dilution due to an injection error of the MEB.

  17. Tune measurement in the NSLS booster synchrotron

    International Nuclear Information System (INIS)

    Blum, E.B.; Nawrocky, R.

    1993-01-01

    The NSLS booster synchrotron can accelerate an electron beam from approximately 80 to 750 MeV in 0.7 sec. The betatron tunes can change during acceleration by as much as 0.1 units, causing beam loss as they cross resonance lines. Precise measurements with a conventional swept spectrum analyzer have always been difficult because of the rapid variation of tune as the magnets are ramped. We are now using a system based on a Tektronix 3052 digital spectrum analyzer that can obtain a complete frequency spectrum over a 10 MHz bandwidth in 200 μsec. Betatron oscillations are stimulated for the measurements by applying white noise to the beam through stripline electrodes. We will describe the instrumentation, our measurements of tune as a function time during the acceleration cycle, and the resulting improvements to the booster operation

  18. Identifying Wind and Solar Ramping Events: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Florita, A.; Hodge, B. M.; Orwig, K.

    2013-01-01

    Wind and solar power are playing an increasing role in the electrical grid, but their inherent power variability can augment uncertainties in power system operations. One solution to help mitigate the impacts and provide more flexibility is enhanced wind and solar power forecasting; however, its relative utility is also uncertain. Within the variability of solar and wind power, repercussions from large ramping events are of primary concern. At the same time, there is no clear definition of what constitutes a ramping event, with various criteria used in different operational areas. Here the Swinging Door Algorithm, originally used for data compression in trend logging, is applied to identify variable generation ramping events from historic operational data. The identification of ramps in a simple and automated fashion is a critical task that feeds into a larger work of 1) defining novel metrics for wind and solar power forecasting that attempt to capture the true impact of forecast errors on system operations and economics, and 2) informing various power system models in a data-driven manner for superior exploratory simulation research. Both allow inference on sensitivities and meaningful correlations, as well as the ability to quantify the value of probabilistic approaches for future use in practice.

  19. The PS booster

    CERN Multimedia

    CERN PhotoLab

    1972-01-01

    The PS booster which accelerates protons from the linac at an energy of 50 MeV to an energy of 800 MeV before injecting them into the main magnet ring of the synchrotron. The booster consists of four superposed rings. In the photograph can be seen the input beam line from the linac and the output beam lines, where beams from the four booster levels have been combined into two beams before final recombination.

  20. Resistors Improve Ramp Linearity

    Science.gov (United States)

    Kleinberg, L. L.

    1982-01-01

    Simple modification to bootstrap ramp generator gives more linear output over longer sweep times. New circuit adds just two resistors, one of which is adjustable. Modification cancels nonlinearities due to variations in load on charging capacitor and due to changes in charging current as the voltage across capacitor increases.

  1. Freeway ramp management in Pennsylvania.

    Science.gov (United States)

    2011-03-31

    This research identified the opportunities to implement ramp management strategies on freeways in Pennsylvania. The research : explored the need to integrate local arterial traffic signal systems with ramp management strategies to reduce the impacts ...

  2. Automated tuning of the advanced photon source booster synchrotron

    International Nuclear Information System (INIS)

    Biedron, S.G.; Milton, S.V.

    1997-01-01

    The acceleration cycle of the Advanced Photon Source (APS) booster synchrotron is completed within 223 ms and is repeated at 2 Hz. Unless properly corrected, transverse and longitudinal injection errors can lead to inefficient booster performance. In order to simplify daily operation, automated tuning methods have been developed. Through the use of beam position monitor (BPM) reading, transfer line corrector magnets, magnet ramp timing, and empirically determined response functions, the injection process is optimized by correcting the first turn trajectory to the measured closed orbit. These tuning algorithms and their implementation are described here along with an evaluation of their performance

  3. PS Booster - Festive colloquium

    CERN Multimedia

    2012-01-01

    A festive colloquium will be held to celebrate the 40th anniversary of the PS Booster on Friday, 28 September at 2 p.m. in the CERN council chamber. The meeting will be open to everybody. Read more on the PS Booster in the CERN Bulletin and in the CERN Courier.

  4. AGS Booster prototype magnets

    Energy Technology Data Exchange (ETDEWEB)

    Danby, G.; Jackson, J.; Lee, Y.Y.; Phillips, R.; Brodowski, J.; Jablonski, E.; Keohane, G.; McDowell, B.; Rodger, E.

    1987-03-19

    Prototype magnets have been designed and constructed for two half cells of the AGS Booster. The lattice requires 2.4m long dipoles, each curved by 10/sup 0/. The multi-use Booster injector requires several very different standard magnet cycles, capable of instantaneous interchange using computer control from dc up to 10 Hz.

  5. AGS booster prototype magnets

    International Nuclear Information System (INIS)

    Danby, G.; Jackson, J.; Lee, Y.Y.; Phillips, R.; Brodowski, J.; Jablonski, E.; Keohane, G.; McDowell, B.; Rodger, E.

    1987-01-01

    Prototype magnets have been designed and constructed for two half cells of the AGS Booster. The lattice requires 2.4m long dipoles, each curved by 10 0 . The multi-use Booster injector requires several very different standard magnet cycles, capable of instantaneous interchange using computer control from dc up to 10 Hz

  6. MEASUREMENTS AND MODELING OF EDDY CURRENT EFFECTS IN BNL'S AGS BOOSTER

    International Nuclear Information System (INIS)

    BROWN, K.A.; AHRENS, L.; GARDNER, C.; GLENN, J.W.; HARVEY, M.; MENG, W.; ZENO, K.

    2006-01-01

    Recent beam experiments at BNL's AGS Booster have enabled us to study in more detail the effects of eddy currents on the lattice structure and our control over the betatron tune. The Booster is capable of operating at ramp rates as high as 9 T/sec. At these ramp rates eddy currents in the vacuum chambers significantly alter the fields and gradients seen by the beam as it is accelerated. The Booster was designed with these effects in mind and to help control the field uniformity and linearity in the Booster Dipoles special vacuum chambers were designed with current windings to negate the affect of the induced eddy currents. In this report results from betatron tune measurements and eddy current simulations will be presented. We will then present results from modeling the accelerator using the results of the magnetic field simulations and compare these to the measurements

  7. RAMP 2003 summary report

    International Nuclear Information System (INIS)

    Moats, D.; Stanley, S.; Abundo, L.; Theriault, C.; Bruce, G.; Gibbons, W.

    2003-01-01

    This report summarized key findings of the 2003 Regional Aquatics Monitoring Program (RAMP) annual technical report. RAMP was formed in 1997 to monitor the health of rivers and lakes in the oil sands region of Alberta and to assess the potential impacts of oil sands development. It was also developed to collect baseline data and compare it with environmental assessment predictions made by oil sand operators in the Wood Buffalo region. In 2003, RAMP monitored fish and fish habitats in the oil sands region, as well as water and sediment quality. Data was also collected on benthic invertebrates; wetlands vegetation; lake acidification data; hydrology; and climate. Studies focused on the Athabasca River and its tributaries; smaller tributaries of the Muskeg River; the North Steepbank River; and the Christina River. Data from wetlands in the vicinity of current and proposed oil sands developments was collected together with data from 50 acid-sensitive lakes in northeastern Alberta. RAMP monitoring activities in 2003 increased in response to increased resource exploitation activities in the region. Information from climate and hydrologic monitoring stations was analyzed in order to model changes resulting from oil sands development. Water levels were monitored to measure discharge, ice thickness, and water depth of selected lakes and streams. Water and sediment quality analyses were conducted to establish the physical and chemical features of the water bodies in the RAMP study area. The analyses suggested that water quality was consistent with previous years. Inputs from tributaries in the oil sands region did not obviously impact water quality in the Athabasca River. Higher levels of polycyclic aromatic hydrocarbons (PAHs) were noted at stations in the oil sands regions. Benthic communities monitored in the study were within expected ranges for undisturbed communities in the region. A RAMP fish monitoring program indicated that spawning runs in the Muskeg River have

  8. BROOKHAVEN: Booster boost

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    After three months of intensive dedicated machine studies, Brookhaven's new Booster accelerated 5 x 10 13 protons over four cycles, about 85% of the design intensity. This was made possible by careful matching of Linac beam into the Booster and by extensive resonance stop band corrections implemented during Booster acceleration. The best single cycle injection into the AGS Alternating Gradient Synchrotron was 1.14 x 10 13 protons from the Booster. 1.05 x 10 13 protons were kept in the AGS, a 92% combined efficiency of extraction, transfer, and injection. The maximum injected 1994 shutdown period, enabling the 1994 physics run to make use of the full Booster intensity and go for the stated AGS objective of 4x10 13 protons per pulse

  9. RAMP 2005 technical report

    International Nuclear Information System (INIS)

    2006-01-01

    This technical report provided details of all monitoring activities conducted by the Regional Aquatics Monitoring Program (RAMP), which was initiated in 1997 to examine the impacts of oil sands mining development on aquatic systems in the region. RAMP's objective is to integrate aquatic monitoring activities in order to identify long-term trends and regional issues related to the environment in the Regional Municipality of Wood Buffalo. In 2005, RAMP focused on key components of boreal aquatic ecosystems. This report provided full outlines of all climate and hydrology monitoring activities; water and sedimentation analyses; and studies of benthic communities in rivers, lakes, and deltas. Sets of measurements endpoints were used to represent the health and integrity of valued environmental resources. Satellite imager was used to estimate activities related to oil sands developments. The report was divided into subsections which related monitoring activities for various rivers and tributaries in the region. Small and negligible calculated changes were observed in hydrologic conditions in the Athabasca River mainstem. No discernible changes in water and sediment quality were observed that could positively be ascribed to oil sands developments in the region. Very little evidence suggested that fish populations had changed as a result of increased activities in the region. The influence of oil sands development activities on the aquatic resources of the Athabasca River mainstem were minor and mostly undetectable. The results of fish tissue studies from the lower Athabasca River showed that concentrations of mercury in fish tissues occurred at levels that posed a high risk to subsistence fishers. A higher number of metal concentrations in some lakes in the region was attributed to natural causes. The results of a sentinel species monitoring program conducted at the Ells River watershed were also included. Recommendations for further refining RAMP programs were also

  10. The CEA-FRAGEMA ramp test programme for the study of the effect of power cycling on PCI at high burn-up

    International Nuclear Information System (INIS)

    Joseph, J.; Atabek, R.; Trotabas, M.

    1983-01-01

    The ramp test programme developed jointly by FRAGEMA and CEA is presented. Today, more than thirty PWR fuel rods have been ramp-tested in experimental reactors SILOE and OSIRIS. Nineteen fuel rods, named 'PRISCA', were base irradiated in BR3 and twelve fuel rods have been refabricated in hot cell by the FABRICE technique. The average fuel burn-up lies between 11 GWd.tU -1 and 46 GWd.tU -1 . In the major cases, the flux profile, during ramp-test, was decentred with respect to the base irradiated flux, and allows to obtain much more information than with a centred flux profile. The failure threshold was established under a set of more than thirty fuel rods of various designs. In particular, the post irradiation examinations allow to locate all rupture locations and thus to define precisely the threshold condition for failure of fuel rods. As an example, the results obtained in the PRISCA 109 experiments are presented. The refabricated fuel rods FABRICE behave identically, with regard to PCI, rather than PRISCA rods. An example of load follow transient in a PWR reactor is presented, and indicates any risk of failure due to PCI. (author)

  11. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  12. The influence of the reactivity ramp on the course of the power transient in the MARK 1A core of the SNR 300

    International Nuclear Information System (INIS)

    Froehlich, R.; Schmuck, P.

    1976-01-01

    The course of a hypothetic transient overpower accident caused by the onset of a not further specified reactivity ramp accompanied by the simultaneous failure of both shutdown systems must be analyzed in the SNR 300 Mark 1A core licensing procedure. The present study is limited to the discussion of the starting and shutdown phases of such accidents for the fresh core. Depending on the operational state of the reactor, the core geometry is still intact during the starting phase. In the following shutdown phase (core disassembly phase), large-scale mass transfer leads to the nuclear shutdown of the reactor. (orig./AK) [de

  13. Portable and Lightweight Ramp Structure

    Science.gov (United States)

    2001-04-09

    long side of which is in abutting relationship with the 12 short side of the end of the ramp. Fastener receivers are equi- 13 spaced in duplicate...The modular sections are conveniently prefabricated 18 1 and provided in kit form to the number of sections corresponding 2 to the desired ramp

  14. Accelerating RF cavity of the Booster

    CERN Multimedia

    CERN PhotoLab

    1983-01-01

    Each of the 4 PS Booster rings has a single accelerating cavity.It consists of 2 quarter-wave ferrite-loaded resonators. 2 figure-of-eight loops tune the frequency throughout the accelerating cycle, from 3 to 8 MHz (from 50 MeV at injection to the original Booster energy of 800 MeV, 2 GeV today). The cavities have a flat design, to fit the ring-to-ring distance of 36 cm, and are forced-air cooled. The 2 round objects in the front-compartments are the final-stage power-tetrodes. See also 8111095.

  15. GRYPHON: Air launched space booster

    Science.gov (United States)

    1993-06-01

    's mission control center. The Structures group was responsible for ensuring the structural integrity of the vehicle. Their designs included the payload shroud, payload support structure, exterior hull and engine support struts. The Gryphon's power requirements were determined by the Power/Thermal/Attitude Control Group. booster aircraft connection. *This included the design of the connection structure and the drop mechanism. -This group also designed the vehicle assembly facility and identified possible ground bases for the plane.

  16. Emittance measurement and modeling for the Fermilab Booster

    Directory of Open Access Journals (Sweden)

    Xiaobiao Huang

    2006-01-01

    Full Text Available Turn-by-turn beam profile data measured at the Fermilab Booster are studied. Lattice models with experimental accelerator ramping parameters are used to obtain the lattice functions for data analysis. We studied the horizontal and vertical emittance growth behavior in different stages of a booster ramping cycle and its relation to the beam intensity. The transverse and longitudinal components in the horizontal beam width are separated by a fitting model which makes use of the different scaling rules of the beam momentum. We analyze the post-transition horizontal beam size oscillation based on a model where the longitudinal phase-space mismatch has resulted from rf voltage mismatch during the transition-energy crossing. We carried out systematic multiparticle simulation to show that the source of the vertical emittance growth is a combination of the random errors in skew-quadrupole and dipole fields, and the systematic Montague resonance. The effect of random quadrupole field is small for the Fermilab Booster because the betatron envelope tunes are reasonably far away from the half-integer stop band.

  17. Booster parameter list

    International Nuclear Information System (INIS)

    Parsa, Z.

    1986-10-01

    The AGS Booster is designed to be an intermediate synchrotron injector for the AGS, capable of accelerating protons from 200 MeV to 1.5 GeV. The parameters listed include beam and operational parameters and lattice parameters, as well as parameters pertaining to the accelerator's magnets, vacuum system, radio frequency acceleration system, and the tunnel. 60 refs., 41 figs

  18. The use of real-time off-site observations as a methodology for increasing forecast skill in prediction of large wind power ramps one or more hours ahead of their impact on a wind plant.

    Energy Technology Data Exchange (ETDEWEB)

    Martin Wilde, Principal Investigator

    2012-12-31

    ABSTRACT Application of Real-Time Offsite Measurements in Improved Short-Term Wind Ramp Prediction Skill Improved forecasting performance immediately preceding wind ramp events is of preeminent concern to most wind energy companies, system operators, and balancing authorities. The value of near real-time hub height-level wind data and more general meteorological measurements to short-term wind power forecasting is well understood. For some sites, access to onsite measured wind data - even historical - can reduce forecast error in the short-range to medium-range horizons by as much as 50%. Unfortunately, valuable free-stream wind measurements at tall tower are not typically available at most wind plants, thereby forcing wind forecasters to rely upon wind measurements below hub height and/or turbine nacelle anemometry. Free-stream measurements can be appropriately scaled to hub-height levels, using existing empirically-derived relationships that account for surface roughness and turbulence. But there is large uncertainty in these relationships for a given time of day and state of the boundary layer. Alternatively, forecasts can rely entirely on turbine anemometry measurements, though such measurements are themselves subject to wake effects that are not stationary. The void in free-stream hub-height level measurements of wind can be filled by remote sensing (e.g., sodar, lidar, and radar). However, the expense of such equipment may not be sustainable. There is a growing market for traditional anemometry on tall tower networks, maintained by third parties to the forecasting process (i.e., independent of forecasters and the forecast users). This study examines the value of offsite tall-tower data from the WINDataNOW Technology network for short-horizon wind power predictions at a wind farm in northern Montana. The presentation shall describe successful physical and statistical techniques for its application and the practicality of its application in an operational

  19. Solar ramping distributions over multiple timescales and weather patterns

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, Bri-Mathias; Hummon, Marissa; Orwig, Kirsten [National Renewable Energy Laboratory, Golden, CO (United States)

    2011-07-01

    As greater amounts of solar power are included in the power system it is becoming increasingly important to have a better characterization of the variability of solar power over the timescales that are relevant to power system operations. In this paper, we examine the distribution of ramp events that occur in global horizontal irradiance measurements from a number of sites in the western United States. The distributions are found to be significantly non-normal over multiple timescales from 1 minute to 1 hour. A hyberbolic distribution is suggested for more accurately representing the observed ramp distributions. Additionally, the ramp distributions that occur during different classifications of weather patterns are characterized and significant differences are observed between patterns. (orig.)

  20. Summary of Booster Development and Qualification Report

    Energy Technology Data Exchange (ETDEWEB)

    Francois, Elizabeth G. [Los Alamos National Laboratory; Harry, Herbert H. [Los Alamos National Laboratory; Hartline, Ernest L. [Los Alamos National Laboratory; Hooks, Daniel E. [Los Alamos National Laboratory; Johnson, Carl E. [Los Alamos National Laboratory; Morris, John S. [Los Alamos National Laboratory; Novak, Alan M. [Los Alamos National Laboratory; Ramos, Kyle J. [Los Alamos National Laboratory; Sanders, Victor E. [Los Alamos National Laboratory; Scovel, Christina A. [Los Alamos National Laboratory; Lorenz, Thomas [LLNL; Wright, Mark [AWE; Botcher, Tod [PANTEX; Marx, Erin [NSWC-IHDIV; Gibson, Kevin [NSWC-IHDIV

    2012-06-21

    This report outlines booster development work done at Los Alamos National Laboratory from 2007 to present. The booster is a critical link in the initiation train of explosive assemblies, from complex devices like nuclear weapons to conventional munitions. The booster bridges the gap from a small, relatively sensitive detonator to an insensitive, but massive, main charge. The movement throughout the explosives development community is to use more and more insensitive explosive components. With that, more energy is needed out of the booster. It has to initiate reliably, promptly, powerfully and safely. This report is divided into four sections. The first provides a summary of a collaborative effort between LANL, LLNL, and AWE to identify candidate materials and uniformly develop a testing plan for new boosters. Important parameters and the tests required to measure them were defined. The nature of the collaboration and the specific goals of the participating partners has changed over time, but the booster development plan stands on its own merit as a complete description of the test protocol necessary to compare and qualify booster materials, and is discussed in its entirety in this report. The second section describes a project, which began in 2009 with the Department of Defense to develop replacement booster formulations for PBXN-7. Replacement of PBXN-7 was necessary because it contained Triaminotrinitrobenzene (TATB), which was becoming unavailable to the DoD and because it contained Cyclotrimethylenetrinitramine (RDX), which was sensitive and toxic. A LANL-developed explosive, Diaminoazoxyfurazan (DAAF), was an important candidate. This project required any replacement formulation be a drop-in replacement in existing munitions. This project was timely, in that it made use of the collaborative booster development project, and had the additional constraint of matching shock sensitivity. Additionally it needed to be a safety improvement, and a performance

  1. Mathematical modeling of compression processes in air-driven boosters

    International Nuclear Information System (INIS)

    Li Zeyu; Zhao Yuanyang; Li Liansheng; Shu Pengcheng

    2007-01-01

    The compressed air in normal pressure is used as the source of power of the air-driven booster. The continuous working of air-driven boosters relies on the difference of surface area between driven piston and driving piston, i.e., the different forces acting on the pistons. When the working surface area of the driving piston for providing power is greater than that of the driven piston for compressing gas, the gas in compression chamber will be compressed. On the basis of the first law of thermodynamics, the motion regulation of piston is analyzed and the mathematical model of compression processes is set up. Giving a calculating example, the vary trends of gas pressure and pistons' move in working process of booster have been gotten. The change of parameters at different working conditions is also calculated and compared. And the corresponding results can be referred in the design of air-driven boosters

  2. An efficiency booster for energy conversion in natural circulation loops

    International Nuclear Information System (INIS)

    Wang, Dongqing; Jiang, Jin

    2016-01-01

    Highlights: • Low driving power conversion efficiency of natural circulation loops is proved. • The low conversion efficiency leads to low heat transfer capacity of such loops. • An efficiency booster is designed with turbine to increase the efficiency. • Performance of the proposed booster has been numerically simulated. • The booster drastically enhances heat transfer capacity of such loops. - Abstract: In this paper, the capacity of a natural circulation loop for transferring heat from a heat source to a heat sink has been analyzed. It is concluded that the capacity of the natural circulation loop depends on the conversion efficiency of the thermal energy from the heat source to the driving force for the circulation of the flow. The low conversion efficiency leading to weak driving force in such loops has been demonstrated analytically and validated through simulation results. This issue has resulted in a low heat transfer capacity in the circulation loop. To increase the heat transfer capacity, one has to improve this efficiency. To meet such a need, a novel efficiency booster has been developed in this paper. The booster essentially increases the flow driving force and hence significantly improves the overall heat transfer capacity. Design and analysis of this booster have been performed in detail. The performance has been examined through extensive computer simulations. It is concluded that the booster can indeed drastically improve the heat transfer capacity of the natural circulation loop.

  3. An efficiency booster for energy conversion in natural circulation loops

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Dongqing, E-mail: wangdongqing@stu.xjtu.edu.cn [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shaanxi 710049 (China); Beijing Computational Science Research Center, Beijing 100084 (China); Jiang, Jin, E-mail: jjiang@eng.uwo.ca [Department of Electrical and Computer Engineering, The University of Western Ontario, London, Ontario N6A 5B9 (Canada); Beijing Computational Science Research Center, Beijing 100084 (China)

    2016-08-01

    Highlights: • Low driving power conversion efficiency of natural circulation loops is proved. • The low conversion efficiency leads to low heat transfer capacity of such loops. • An efficiency booster is designed with turbine to increase the efficiency. • Performance of the proposed booster has been numerically simulated. • The booster drastically enhances heat transfer capacity of such loops. - Abstract: In this paper, the capacity of a natural circulation loop for transferring heat from a heat source to a heat sink has been analyzed. It is concluded that the capacity of the natural circulation loop depends on the conversion efficiency of the thermal energy from the heat source to the driving force for the circulation of the flow. The low conversion efficiency leading to weak driving force in such loops has been demonstrated analytically and validated through simulation results. This issue has resulted in a low heat transfer capacity in the circulation loop. To increase the heat transfer capacity, one has to improve this efficiency. To meet such a need, a novel efficiency booster has been developed in this paper. The booster essentially increases the flow driving force and hence significantly improves the overall heat transfer capacity. Design and analysis of this booster have been performed in detail. The performance has been examined through extensive computer simulations. It is concluded that the booster can indeed drastically improve the heat transfer capacity of the natural circulation loop.

  4. Model for RHIC ramp controls

    International Nuclear Information System (INIS)

    Kewisch, J.; Mane, V.; Clifford, T.; Hartmann, H.; Kahn, T.; Oerter, B.; Peggs, S.

    1994-01-01

    This paper introduces the hardware and software concepts for the implementation of the ramp controls. The hardware part of the ramp controls consists of a number of multi-purpose Wave Form Generators (WFGS) which control the settings of accelerator hardware directly or indirectly by controlling their WFG. A Real Time Data Link (RTDL) data transfer system connects the WFGs in a three layer architecture. To the usual two layers which generate an independent timing signal and dependent set points, respectively, an intermediate layer is added which produces accelerator parameters such as the magnet strength. The task of the bottom layer is therefore reduced to the function of implementing those parameters. This architecture de-couples two independent functions which axe normally folded together. The function of the hardware becomes modular and easily maintainable. The ramp control software is layered in the same way. Between the top layer (the ramp procedure application program) and the bottom layer (the hardware interface) an additional layer of ''manager'' programs allow operation of accelerator subsystems

  5. Rural Alaska Mentoring Project (RAMP)

    Science.gov (United States)

    Cash, Terry

    2011-01-01

    For over two years the National Dropout Prevention Center (NDPC) at Clemson University has been supporting the Lower Kuskokwim School District (LKSD) in NW Alaska with their efforts to reduce high school dropout in 23 remote Yup'ik Eskimo villages. The Rural Alaska Mentoring Project (RAMP) provides school-based E-mentoring services to 164…

  6. Fox-7 for Insensitive Boosters

    Science.gov (United States)

    2010-08-01

    cavitation , and therefore nucleation, to occur at each frequency. As well as producing ultrasound at different frequencies, the method of delivery of...processing techniques using ultrasound , designed to optimise FOX-7 crystal size and morphology to improve booster formulations, and results from these...7 booster formulations. Also included are particle processing techniques using ultrasound , designed to optimise FOX-7 crystal size and morphology

  7. SUPER-RAMP PK2 cases by START-3. Preliminary Report

    International Nuclear Information System (INIS)

    Novikov, Vladimir; Kuznetsov, Vladimir; Chulkin, Dmitriy

    2013-01-01

    The Studsvik SUPER-RAMP Project, an internationally sponsored research project, investigated the failure propensity of typical LWR fuel in the form of test rods when subjected to power ramps, after base irradiation to high burn-up. The following information summarizing the project is abstracted from the Final Report of the SUPER-RAMP project (STSR-32). The Project power ramped 28 individual PWR rods and 16 BWR rods. The PWR rods were all tested using high ramp rates. Due to different objectives for the BWR subprogramme, one set of the BWR rods was tested using a high ramp rate, and another set were tested with a very slow ramp rate. All rods underwent a thorough examination programme, comprising characterisation prior to base irradiation, examination between base and ramp irradiation and examination after ramp irradiation. This consisted of 6 groups of rods with variations in design and material parameters. The rods were base irradiated in a power reactor environment KK Obrigheim or BR-3 at time averaged heat ratings mainly in the range 14-26 kW/m to peak burn-ups in the range 33-45 MWd/kgU and were subsequently ramp tested in the research reactor R2 at Studsvik, Sweden. The result can be summarized as follows: In this document some calculations are made on the PK2 group fuel rods. The rods were standard rods manufactured by Kraftwerk Union AG/Combustion Engineering (KWU/CE). All these rods sustained ramping to power levels in the range 41 to 49 kW/m and power changes 16-24 kW/m without failure, in spite of large deformations, fuel restructuring and fission gas release particularly for the PK2 rods. Though the results of this paper seem to be based on the incomplete dataset (ambiguity in power raise rates, undefined fuel pellet and cladding surface roughness), we think that START-3 Zircalloy-4 model requires further improvements. In order to do them, we kindly ask IAEA to provide us with more detailed irradiation histories (more than 3 axial zones, power increase

  8. Evaluation of the thermal-mechanical performance of fuel rods of a BWR during a power ramp using the FUELSIM code

    International Nuclear Information System (INIS)

    Pantoja C, R.

    2010-01-01

    To avoid the risk to environment due to release of radioactive material, because of occurrence of an accident, it is the priority of the design and performance of the diverse systems of safety of a commercial nuclear power plant. The safety of nuclear power plants requires, therefore, monitoring those parameters having some direct or indirect effect on safety. The thermal limits are values set for those parameters considered having most impact on the safe operation of a nuclear power reactor. Some thermal limits monitoring requires the thermal-mechanical analysis of the rods containing the nuclear fuel. The fuel rod thermal-mechanical behavior under irradiation is a complex process in which there exists a great deal of interrelated physical and chemical phenomena, so that the fuel rod performance analysis in the core of a nuclear power reactor is generally accomplished by using computer codes, which integrate several of the phenomena that are expected to occur during the lifetime of the fuel rod in the core. The main application of the thermal-mechanical analysis codes is the prediction of occurrence of conditions and/or phenomena that could lead to the deterioration or even mechanical failure of the fuel rod cladding, as, for example, the pellet-cladding interaction. In the operation of a nuclear power reactor, fuel preconditioning operations refer to the operational procedures employed to reduce the fuel rod failure probability due to fuel-cladding interaction, specially during reactor startup. Preconditioning simulations are therefore necessary to determine in advance limit values for the power that can be generated in a fuel rod, and thus avoiding any rod damage. In this work, a first analysis of the thermal-mechanical performance of typical fuel rods used in nuclear reactors of the type BWR 5/6, as those two nuclear reactors in Laguna Verde, Veracruz, is performed. This study includes two types of fuel rods: one from a fuel assembly design with an array 8 x 8

  9. Superconducting linac booster

    International Nuclear Information System (INIS)

    Srinivasan, B.; Betigeri, M.G.; Pandey, M.K.; Pillay, R.G.; Kurup, M.B.

    1997-01-01

    The report on superconducting LINAC booster, which is a joint project of Bhabha Atomic Research Centre (BARC) and Tata Institute of Fundamental Research (TIFR), brings out the work accomplished so far towards the development of the technology of superconducting LINAC to boost the energy of ions from the 14UD Pelletron. The LINAC is modular in construction with each module comprising of a helium cryostat housing four lead-plated quarter wave resonators. The resonators are superconducting for temperatures below 7.19K. An energy boost of 2 MeV/q per module is expected to be achieved. The first module and the post-tandem superbuncher have been fabricated and tested on the LINAC beam line. This report gives a summary of the technological achievements and also brings out the difficulties encountered during the R and D phase. (author)

  10. PS Booster Orbit Correction

    CERN Document Server

    Chanel, M; Rumolo, G; Tomás, R; CERN. Geneva. AB Department

    2008-01-01

    At the end of the 2007 run, orbit measurements were carried out in the 4 rings of the PS Booster (PSB) for different working points and beam energies. The aim of these measurements was to provide the necessary input data for a PSB realignment campaign during the 2007/2008 shutdown. Currently, only very few corrector magnets can be operated reliably in the PSB; therefore the orbit correction has to be achieved by displacing (horizontally and vertically) and/or tilting some of the defocusing quadrupoles (QDs). In this report we first describe the orbit measurements, followed by a detailed explanation of the orbit correction strategy. Results and conclusions are presented in the last section.

  11. Global Decoupling on the RHIC Ramp

    CERN Document Server

    Luo, Yun; Della Penna, Al; Fischer, Wolfram; Laster, Jonathan S; Marusic, Al; Pilat, Fulvia Caterina; Roser, Thomas; Trbojevic, Dejan

    2005-01-01

    The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC). In the polarized proton run, the betatron tunes are required to keep almost constant on the ramp to avoid spin resonance line crossing and the beam polarization loss. Some possible correction schemes on the ramp, like three-ramp correction, the coupling amplitude modulation and the coupling phase modulaxtion, have been found. The principles of these schemes are shortly reviewed and compared. Operational results of their applications on the RHIC ramps are given.

  12. Ramp Metering Influence on Freeway Operational Safety near On-ramp Exits

    Directory of Open Access Journals (Sweden)

    Chiu Liu, PhD, PE, PTOE

    2013-06-01

    Full Text Available Ramp metering has been widely installed in urban areas where congestion on a freeway or an expressway may occur recurrently during weekday peak periods to enhance mainline throughput and reduce system-wide delay. These operational benefits may also help reduce vehicular emissions and improve air quality in urban areas. However, the impact on traffic safety due to ramp metering hasn't been explored in details before. Supported by physical understanding and arguments, we characterize the ramp metering influence on freeway safety by examining vehicular collisions near on-ramp exits within the ramp meter operating hours before and after the activation of the ramp metering. Collisions for a sample of 19 operating ramp meters along several freeways in northern California were collected and organized to show that ramp metering can help reduce freeway collisions at the vicinity of on-ramp exits. It was found that the average reductions on freeway collisions in the vicinity of an on-ramp exit are around 36%. Although most of the reduced collisions belong to the property damage only category, a 36% reduction shows the significant safety benefit of ramp metering. The traffic congestion induced by each collision, especially during peak hours when ramp metering is in operation, could last for an hour or two. Consequently, ramp metering must be contributing to the reduction of non-recurrent congestion in addition to mitigating recurrent congestion, which is better documented. This study strongly supports the implementation of ramp metering in California.

  13. START-3 calculations of SUPER-RAMP (FUMEX-III) cases

    International Nuclear Information System (INIS)

    Chulkin, D.; Kuznetsov, V.; Krupkin, A.; Bogatyr, S.; Novikov, V.

    2011-01-01

    The Studsvik SUPER-RAMP Project, an internationally sponsored research project, investigated the failure propensity of typical LWR fuel in the form of test rods when subjected to power ramps, after base irradiation. The Project power ramped 28 individual PWR rods and 16 BWR rods. The PWR rods were all tested using high ramp rates. Due to different objectives for the BWR subprogram, one set of the BWR rods was tested using a high ramp rate, and another set were tested with a very slow ramp rate. The rods were base irradiated in a power reactor environment KK Obrigheim or BR-3 at time averaged heat ratings mainly in the range 14-26 kW/m to peak bum-ups in the range 33-45 MWd/kgU and were subsequently ramp tested in the research reactor R2 at Studsvik, Sweden. In this presentation some calculations are made on the PK2 group fuel rods. The rods were standard rods manufactured by Kraftwerk Union AG/Combustion Engineering (KWU/CE). Calculations have shown reasonable coincidence of calculated and experimental FGR and reasonable prediction of dimensional behavior of fuel rod. Following the lead taken in the original FUMEX CRP, a number of simplified cases were constructed in order to investigate mathematical stability and more easily compare model and code predictions without the vagaries of real power histories. In this presentation, each case is outlined together with the reason for its inclusion before presenting the results and comparing the predictions

  14. Conceptual design report: superconducting booster

    International Nuclear Information System (INIS)

    1983-01-01

    The Superconducting Booster project includes the construction of a new high-voltage injector and buncher for the existing tandem, a magnetic transport system, an rf linac with superconducting resonators, and a rebuncher-debuncher. The booster will fit in existing space so that a new building is not required. The layout of the accelerator is given in Fig. I-1. The University of Washington is contributing approximately $1 M to this project

  15. Estimating the Probability of Wind Ramping Events: A Data-driven Approach

    OpenAIRE

    Wang, Cheng; Wei, Wei; Wang, Jianhui; Qiu, Feng

    2016-01-01

    This letter proposes a data-driven method for estimating the probability of wind ramping events without exploiting the exact probability distribution function (PDF) of wind power. Actual wind data validates the proposed method.

  16. Booster LINAC project: introduction

    International Nuclear Information System (INIS)

    Storm, D.W.

    1984-01-01

    During the past year the DOE awarded a contract to build the superconducting booster proposed in 1982. Although the majority of the funds ($8M) of the project are construction funds included in the DOE contract, part of the project is to be done with state funds ($1.03M) and part with the operating funds (3 FTE personnel as well as costs of prototyping the resonators). Therefore it is appropriate to outline the progress in this report. The overall design was changed somewhat from that described in last year's Annual Report. Instead of 12 split ring resonators optimized for beta = 0.10 and 12 for beta = 0.16, the author has chosen to use 16 quarter wave resonators optimized for beta = 0.09 and 16 for beta = 0.18. The quarter wave resonators, which have two accelerating gaps instead of the three of the split rings, have a wider transit time factor, which is favorable for accelerating a broader range of particle masses. The quarter wave resonators are to be built of lead plated copper, following the design of Ben-Zvi and Brennan

  17. Review of Wind Energy Forecasting Methods for Modeling Ramping Events

    Energy Technology Data Exchange (ETDEWEB)

    Wharton, S; Lundquist, J K; Marjanovic, N; Williams, J L; Rhodes, M; Chow, T K; Maxwell, R

    2011-03-28

    Tall onshore wind turbines, with hub heights between 80 m and 100 m, can extract large amounts of energy from the atmosphere since they generally encounter higher wind speeds, but they face challenges given the complexity of boundary layer flows. This complexity of the lowest layers of the atmosphere, where wind turbines reside, has made conventional modeling efforts less than ideal. To meet the nation's goal of increasing wind power into the U.S. electrical grid, the accuracy of wind power forecasts must be improved. In this report, the Lawrence Livermore National Laboratory, in collaboration with the University of Colorado at Boulder, University of California at Berkeley, and Colorado School of Mines, evaluates innovative approaches to forecasting sudden changes in wind speed or 'ramping events' at an onshore, multimegawatt wind farm. The forecast simulations are compared to observations of wind speed and direction from tall meteorological towers and a remote-sensing Sound Detection and Ranging (SODAR) instrument. Ramping events, i.e., sudden increases or decreases in wind speed and hence, power generated by a turbine, are especially problematic for wind farm operators. Sudden changes in wind speed or direction can lead to large power generation differences across a wind farm and are very difficult to predict with current forecasting tools. Here, we quantify the ability of three models, mesoscale WRF, WRF-LES, and PF.WRF, which vary in sophistication and required user expertise, to predict three ramping events at a North American wind farm.

  18. Effect of PWR Re-start ramp rate on pellet-cladding interactions

    International Nuclear Information System (INIS)

    Yagnik, S.K.; Chang, B.C.; Sunderland, D.J.

    2005-01-01

    To mitigate pellet-cladding interaction (PCI) leading to fuel rod failures, fuel suppliers specify reactor power ramp rate limitations during reactor start-up after an outage. Typical re-start ramp rates are restricted and range between 3-4% per hour of full reactor power above a threshold power level. Relaxation of threshold power and ramp rate restrictions has the potential to improve plant economics. The paper will compare known re-start power ascension procedures employed in the US, German, French and Korean PWRs after a refuelling outage. A technical basis for optimising power ascension procedures during reactor start-up can be developed using analytical modelling. The main objective of the modelling is to determine the potential for PCI failure for various combinations of threshold power levels and ramp rate levels. A key element of our analysis is to estimate the decrease in margin to cladding failure by ISCC based on a time-temperature-stress failure criterion fashioned Act a cumulative cladding damage index. The analysis approach and the cladding damage model will be described and the results from three case studies based on the FALCON fuel rod behaviour code will be reported. We conclude that the PCI behaviour is more affected by ramp rate and threshold power than by the fuel design and that the fuel power history is the most important parameter. (authors)

  19. Ramp generator circuit for probe diagnostics using microcontroller for LHCD system

    International Nuclear Information System (INIS)

    Virani, C G; Sharma, P K

    2010-01-01

    It is well known that in LHCD system, the rf power coupling between antenna and plasma strongly depends on the edge plasma parameter. Thus it is mandatory to monitor edge plasma parameter to establish proper impedance matching condition when LHCD power is launched into the plasma. For SST1 LHCD system, we intend to monitor the edge plasma parameter employing electric probes, connected to the grill antenna sides for the said purpose. In SST1, initially LHCD system would couple rf power to plasmas lasting for small durations. Gradually the power and pulse length would be increased to eventually get 1000 seconds plasma. To monitor the edge plasma parameter, over such a wide spectrum (say few millisecond to seconds) during the above campaign, a flexible measurement scheme is desired which would cater to entire spectrum of operation. Normally a ramp is utilized to bias the electric probe, which yields various plasma parameters. To cater our requirement, the ramp generator must have facility to change ramp-up rate to meet our pulse length requirement. Further during SST operation, the human access near the machine would not be permitted and ramp circuit might not be accessible for manual settings. Thus remote setting facility to change ramp-up rate is also desired. Keeping these constraints in mind, a ramp circuit has been designed using Analog Device micro-controller ADuC842. The circuit has both manual and remote setting facility. Ramp generator parameters like Ramp-up rate, Trigger mode, number of cycles, etc. can be set from PC through RS-485 serial link. Initially low voltage (0-5V) ramp signal is generated using micro-controller and inbuilt DAC. This low voltage ramp is then amplified with PA-85 op-amp to get desired probe biasing voltage (-110V to +110V). The ramp period can be change form (1ms to 1000 ms) to cater to different plasma pulse length. Programming for micro-controller is done in structured language-C with the help of ''Keil'' IDE. In this paper, a

  20. Numerical Study of Quench Protection for Fast-Ramping Accelerator Magnets

    CERN Document Server

    Schwerg, N; Mess, K-N; Russenschuck, S

    2009-01-01

    The quench module of the ROXIE field computation program has been presented at previous conferences. In this paper we discuss recently implemented features that allow quench simulation of fast-ramping superconducting magnets. As the reliability of quench detection during the ramps depends on the signal to noise ratio, we simulate the influence of detection thresholds and the propagation of undetected quenches during the ramps. We also study the effect of an increased copper content and the feasibility of a self-protected magnet surviving a powering cycle with an undetected quench and without quench heater firing or energy-extraction system.

  1. Ramp generator circuit for probe diagnostics using microcontroller for LHCD system

    Energy Technology Data Exchange (ETDEWEB)

    Virani, C G; Sharma, P K, E-mail: cgvirani@ipr.res.i [Institute for Plasma Research, Bhat, Gandhinagar 382428 (India)

    2010-02-01

    It is well known that in LHCD system, the rf power coupling between antenna and plasma strongly depends on the edge plasma parameter. Thus it is mandatory to monitor edge plasma parameter to establish proper impedance matching condition when LHCD power is launched into the plasma. For SST1 LHCD system, we intend to monitor the edge plasma parameter employing electric probes, connected to the grill antenna sides for the said purpose. In SST1, initially LHCD system would couple rf power to plasmas lasting for small durations. Gradually the power and pulse length would be increased to eventually get 1000 seconds plasma. To monitor the edge plasma parameter, over such a wide spectrum (say few millisecond to seconds) during the above campaign, a flexible measurement scheme is desired which would cater to entire spectrum of operation. Normally a ramp is utilized to bias the electric probe, which yields various plasma parameters. To cater our requirement, the ramp generator must have facility to change ramp-up rate to meet our pulse length requirement. Further during SST operation, the human access near the machine would not be permitted and ramp circuit might not be accessible for manual settings. Thus remote setting facility to change ramp-up rate is also desired. Keeping these constraints in mind, a ramp circuit has been designed using Analog Device micro-controller ADuC842. The circuit has both manual and remote setting facility. Ramp generator parameters like Ramp-up rate, Trigger mode, number of cycles, etc. can be set from PC through RS-485 serial link. Initially low voltage (0-5V) ramp signal is generated using micro-controller and inbuilt DAC. This low voltage ramp is then amplified with PA-85 op-amp to get desired probe biasing voltage (-110V to +110V). The ramp period can be change form (1ms to 1000 ms) to cater to different plasma pulse length. Programming for micro-controller is done in structured language-C with the help of ''Keil'' IDE

  2. Tha AGS Booster high frequency rf system

    International Nuclear Information System (INIS)

    Sanders, R.; Cameron, P.; Damn, R.

    1988-01-01

    A high level rf system, including a power amplifier and cavity has been designed for the AGS Booster. It covers a frequency range of 2.4 to 4.2 Mhz and will be used to accelerate high intensity proton, and low intensity polarized proton beams to 1.5 GeV and heavy ions to 0.35 GeV per nucleon. A total accelerating voltage of up to 90kV will be provided by two cavities, each having two gaps. The internally cross-coupled, pushpull cavities are driven by an adjacently located power amplifier. In order to accommodate the high beam intensity, up to 0.75 /times/ 10 13 protons per bunch, a low plate resistance power tetrode is used. The tube anode is magnetically coupled to one of the cavity's two paralleled cells. The amplifier is a grounded cathode configuration driven by a remotely located solid state amplifier

  3. The AGS Booster control system

    International Nuclear Information System (INIS)

    Frankel, R.; Auerbach, E.; Culwick, B.; Clifford, T.; Mandell, S.; Mariotti, R.; Salwen, C.; Schumburg, N.

    1988-01-01

    Although moderate in size, the Booster construction project requires a comprehensive control system. There are three operational modes: as a high intensity proton injector for the AGS, as a heavy ion accelerator and injector supporting a wide range of ions and as a polarized proton storage injector. These requirements are met using a workstation based extension of the existing AGS control system. Since the Booster is joining a complex of existing accelerators, the new system will be capable of supporting multiuser operational scenarios. A short discussion of this system is discussed in this paper

  4. EBR-II high-ramp transients under computer control

    International Nuclear Information System (INIS)

    Forrester, R.J.; Larson, H.A.; Christensen, L.J.; Booty, W.F.; Dean, E.M.

    1983-01-01

    During reactor run 122, EBR-II was subjected to 13 computer-controlled overpower transients at ramps of 4 MWt/s to qualify the facility and fuel for transient testing of LMFBR oxide fuels as part of the EBR-II operational-reliability-testing (ORT) program. A computer-controlled automatic control-rod drive system (ACRDS), designed by EBR-II personnel, permitted automatic control on demand power during the transients

  5. 47 CFR 101.151 - Use of signal boosters.

    Science.gov (United States)

    2010-10-01

    ... authorized to operate multiple address systems in the 928-929/952-960 MHz and 932-932.5/941-941.5 MHz bands..., or portable station(s). The booster will fill in only weak signal areas and cannot extend the system... automatic gain control circuitry which will limit the total effective radiated power (ERP) of the unit to a...

  6. 47 CFR 90.219 - Use of signal boosters.

    Science.gov (United States)

    2010-10-01

    ... to operate radio systems in the frequency bands above 150 MHz may employ signal boosters at fixed... fill in only weak signal areas and cannot extend the system's normal signal coverage area. (b) Class A... effective radiated power (ERP) of the unit to a maximum of 5 watts under all conditions. Class B broadband...

  7. History of the ZGS 500 MeV booster.

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, J.; Martin; R.; Kustom, R.

    2006-05-09

    The history of the design and construction of the Argonne 500 MeV booster proton synchrotron from 1969 to 1982 is described. This accelerator has since been in steady use for the past 25 years to power the Argonne Intense Pulsed Neutron Source (IPNS).

  8. Multi-Physics Analysis of the Fermilab Booster RF Cavity

    International Nuclear Information System (INIS)

    Awida, M.; Reid, J.; Yakovlev, V.; Lebedev, V.; Khabiboulline, T.; Champion, M.

    2012-01-01

    After about 40 years of operation the RF accelerating cavities in Fermilab Booster need an upgrade to improve their reliability and to increase the repetition rate in order to support a future experimental program. An increase in the repetition rate from 7 to 15 Hz entails increasing the power dissipation in the RF cavities, their ferrite loaded tuners, and HOM dampers. The increased duty factor requires careful modelling for the RF heating effects in the cavity. A multi-physic analysis investigating both the RF and thermal properties of Booster cavity under various operating conditions is presented in this paper.

  9. LS1 Report: PS Booster prepares for beam

    CERN Multimedia

    Katarina Anthony

    2014-01-01

    With Linac2 already up and running, the countdown to beam in the LHC has begun! The next in line is the PS Booster, which will close up shop to engineers early next week. The injector will be handed over to the Operations Group who are tasked with getting it ready for active duty.   Taken as we approach the end of LS1 activities, this image shows where protons will soon be injected from Linac2 into the four PS Booster rings. Over the coming two months, the Operations Group will be putting the Booster's new elements through their paces. "Because of the wide range of upgrades and repairs carried out in the Booster, we have a very full schedule of tests planned for the machine," says Bettina Mikulec, PS Booster Engineer in Charge. "We will begin with cold checks; these are a wide range of tests carried out without beam, including system tests with power on/off and with varying settings, as well as verification of the controls system and timings." Amon...

  10. A differential-delay control for ramped magnet current

    Energy Technology Data Exchange (ETDEWEB)

    Murray, J. [State Univ. of New York, Stony Brook, NY (United States). Dept. of Electrical Engineering; Olsen, R. [Brookhaven National Lab., Upton, NY (United States)

    1992-11-01

    A differential-delay control system has been designed and implemented for the main dipole magnet power supply of the booster ring at the National Synchrotron Light Source at Brookhaven National Lab. The control algorithm was implemented on a floating-point digital signal processor; in tests, the use of digital signal-processing techniques gave a factor of ten improvement in the tracking response time, together with a modest improvement in tracking accuracy.

  11. A differential-delay control for ramped magnet current

    Energy Technology Data Exchange (ETDEWEB)

    Murray, J. (State Univ. of New York, Stony Brook, NY (United States). Dept. of Electrical Engineering); Olsen, R. (Brookhaven National Lab., Upton, NY (United States))

    1992-01-01

    A differential-delay control system has been designed and implemented for the main dipole magnet power supply of the booster ring at the National Synchrotron Light Source at Brookhaven National Lab. The control algorithm was implemented on a floating-point digital signal processor; in tests, the use of digital signal-processing techniques gave a factor of ten improvement in the tracking response time, together with a modest improvement in tracking accuracy.

  12. Diamond Light Source Booster fast orbit feedback system

    International Nuclear Information System (INIS)

    Gayadeen, S.; Duncan, S.R.; Christou, C.; Heron, M.T.; Rowland, J.

    2012-01-01

    The Fast Orbit Feedback system that has been installed on the Diamond Light Source Storage ring has been replicated on the Booster synchrotron in order to provide a test bed for the development of the Storage Ring controller design. To realise this the Booster is operated in DC mode. The electron beam is regulated in two planes using the Fast Orbit Feedback system, which takes the beam position from 22 beam position monitors for each plane, and calculates offsets to 44 corrector power supplies at a sample rate of 10 kHz. This paper describes the design and realization of the controller for the Booster Fast Orbit Feedback, presents results from the implementation and considers future development

  13. Proposed data acquisition system for the Fermilab Booster

    International Nuclear Information System (INIS)

    Bharadwaj, V.; Peggs, S.; Wu, G.; Saltmarsh, C.

    1991-01-01

    At present, studies involving the FNAL Booster (or in fact most accelerators) depend on knowing exactly what detector one has to look at and at what time. Because of this, most studies are done 'on-line' and involve looking for repetitive effects using a limited number of detectors. In this paper the authors propose to design a Booster Data Acquisition System (BDAQ) for the FNAL Booster. In essence this system consists of a large number of digitizers with circular memory buffers. After a machine cycle of interest, these buffers are frozen and then read out into a mass storage device. This paper discusses the hardware and software capabilities needed to make such a data acquisition system a powerful tool for doing accelerator physics studies and improving machine performance

  14. Pricing the Ramping Reserve and Capacity Reserve in Real Time Markets

    OpenAIRE

    Ye, Hongxing; Li, Zuyi

    2015-01-01

    The increasing penetration of renewable energy in recent years has led to more uncertainties in power systems. In order to maintain system reliability and security, electricity market operators need to keep certain reserves in the Security-Constrained Economic Dispatch (SCED) problems. A new concept, deliverable generation ramping reserve, is proposed in this paper. The prices of generation ramping reserves and generation capacity reserves are derived in the Affine Adjustable Robust Optimizat...

  15. Radiation-hard mid-power booster optical fiber amplifiers for high-speed digital and analogue satellite laser communication links

    Science.gov (United States)

    Stampoulidis, L.; Kehayas, E.; Stevens, G.; Henwood-Moroney, L.; Hosking, P.; Robertson, A.

    2017-11-01

    Optical laser communications (OLC) has been identified as the technology to enable high-data rate, secure links between and within satellites, as well as between satellites and ground stations with decreased mass, size, and electrical power compared to traditional RF technology.

  16. Subcriticality determination in ADS: Valina-Booster experiments

    International Nuclear Information System (INIS)

    Persson, C. M.; Gudowski, W.; Fokau, A.; Bournos, V.; Fokov, Y.; Routkovskaia, C.; Serafimovich, I.; Kiyavitskaya, H.

    2007-01-01

    A major problem in operating a full-scale subcritical accelerator-driven system (ADS) is to ensure sufficient margin to criticality. Therefore, reliable techniques for subcriticality monitoring are required. In order to develop such techniques, a full understanding of existing reactivity determination methods is essential. In this work, reactivity determination methods, such as pulsed neutron source methods and noise methods, are studied experimentally in the subcritical facility YALINA-Booster. YALINA-Booster: The subcritical assembly YALINA-Booster: recently constructed at the Joint Institute for Power and Nuclear Research - Sosny, consists of a subcritical core driven by an external neutron source. The neutron source is a powerful neutron generator consisting of a deuteron accelerator and a target of deuterium or tritium embedded in titanium. Through (d, d) - or (d, t)-reactions neutrons are created with energy around 2.5 MeV and 14.1 MeV respectively. Neutrons are born in the centre of the core and multiply through a lead matrix fuelled with highly enriched uranium (90% and 36%). This zone is referred to as the booster zone and is surrounded by a thermal zone, moderated by polyethylene. In order to reach sufficient high effective multiplication factor, the thermal zone is fuelled by approximately one thousand rods of 10% enriched uranium dioxide in cylindrical geometry. To prevent thermal neutrons from diffusing into the fast booster zone, an interface, consisting of boron carbide and natural uranium rods, is located between the zones. YALINA-Booster has a radial graphite reflector of thickness 24 cm. Experiments: Experiments using the neutron source in pulsed mode will be presented, relying on methods such as the area method and the method of prompt neutron decay rate determination. Moreover, results from noise analysis using for instance the Feynman-α method will be presented

  17. The PS Booster hits 40

    CERN Multimedia

    Joannah Caborn Wengler

    2012-01-01

    Many accelerators’ "round" birthdays are being celebrated at CERN these days – the PS turned 50 in 2009, the SPS was 35 in 2011, and this year it's the turn of the PS Booster to mark its 40th anniversary. Originally designed to accelerate 1013 protons to 800 MeV, it has far exceeded its initial design performance over the years.   The PS Booster in the 1970s. Imagine the scene: a group of accelerator physicists staring expectantly at a monitor, when suddenly a shout of joy goes up as a signal flickers across the screen. Does that sound familiar? Well, turn the clock back 40 years (longer hair, wider trouser legs) and you have the situation at the PS Booster on 26 May 1972. On that day, beam was injected into the Booster for the first time. “It was a real buzz,” says Heribert Koziol, then Chairman of the Running-in Committee. “We were very happy – and also a little relieved – when the beam finally...

  18. Linac boosters for electrostatic machines

    International Nuclear Information System (INIS)

    Ben-Zvi, I.; Brookhaven National Lab., Upton, NY

    1990-01-01

    A survey of linacs which are used as boosters to electrostatic accelerators is presented. Machines both operating and under construction, copper and superconducting, are reviewed. The review includes data on the accelerating structures, performance, rf and control, beam optics, budget, vacuum and cryogenics. (orig.)

  19. YALINA Booster subcritical assembly modeling and analyses

    International Nuclear Information System (INIS)

    Talamo, A.; Gohar, Y.; Aliberti, G.; Cao, Y.; Zhong, Z.; Kiyavitskaya, H.; Bournos, V.; Fokov, Y.; Routkovskaya, C.; Sadovich, S.

    2010-01-01

    Full text: Accurate simulation models of the YALINA Booster assembly of the Joint Institute for Power and Nuclear Research (JIPNR)-Sosny, Belarus have been developed by Argonne National Laboratory (ANL) of the USA. YALINA-Booster has coupled zones operating with fast and thermal neutron spectra, which requires a special attention in the modelling process. Three different uranium enrichments of 90%, 36% or 21% were used in the fast zone and 10% uranium enrichment was used in the thermal zone. Two of the most advanced Monte Carlo computer programs have been utilized for the ANL analyses: MCNP of the Los Alamos National Laboratory and MONK of the British Nuclear Fuel Limited and SERCO Assurance. The developed geometrical models for both computer programs modelled all the details of the YALINA Booster facility as described in the technical specifications defined in the International Atomic Energy Agency (IAEA) report without any geometrical approximation or material homogenization. Materials impurities and the measured material densities have been used in the models. The obtained results for the neutron multiplication factors calculated in criticality mode (keff) and in source mode (ksrc) with an external neutron source from the two Monte Carlo programs are very similar. Different external neutron sources have been investigated including californium, deuterium-deuterium (D-D), and deuterium-tritium (D-T) neutron sources. The spatial neutron flux profiles and the neutron spectra in the experimental channels were calculated. In addition, the kinetic parameters were defined including the effective delayed neutron fraction, the prompt neutron lifetime, and the neutron generation time. A new calculation methodology has been developed at ANL to simulate the pulsed neutron source experiments. In this methodology, the MCNP code is used to simulate the detector response from a single pulse of the external neutron source and a C code is used to superimpose the pulse until the

  20. Studsvik SUPER-RAMP-II: 9x9 Project

    International Nuclear Information System (INIS)

    Djurle, S.

    1991-12-01

    EPRI participated in an international program involving ramp-testing of 9 x 9 fuel rod segments in a test reactor in Sweden. The principal objective was to establish the pellet-cladding interaction (PCI) failure threshold for this type of fuel. Several segmented fuel rods were irradiated in Dresden-2 BWR with time-averaged linear heat ratings ranging from 13 to 17 kW/m up to average burnup ranging from 26 to 34 MWd/kgU. The segments were subsequently subjected to ramp-testing in the R2 reactor at Studsvik Nuclear. The ramp-testing consisted of an initial irradiation of peak linear heat rating between 12 to 16 kW/m for about two hours, followed by a rapid increase to a power level in the range of 36 to 50 kW/m. The upper power level was maintained for twelve hours or until the fuel failure was detected. The study concluded that for 9 x 9 fuel type the PCI failure threshold is ∼38 kW/m, independent of the burnup in the range of 26 to 34 MWd/kgU. This failure threshold is about 5 kW/m greater than that of traditional 8 x 8 design. Although the significance of this difference can be argued, the interim and final fuel examinations performed in this project by destructive and nondestructive methods revealed valuable detailed information on fuel performance, which is also documented and discussed in this report

  1. TRACY transient experiment databook. 3) Ramp feed experiment

    Energy Technology Data Exchange (ETDEWEB)

    Nakajima, Ken; Yamane, Yuichi; Ogawa, Kazuhiko; Aizawa, Eiju; Yanagisawa, Hiroshi; Miyoshi, Yoshinori [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-03-01

    This is a databook of TRACY ''ramp feed'' experiments. TRACY is a reactor to perform supercritical experiments using low-enriched uranyl nitrate aqueous solution. The excess reactivity of TRACY is 3$ at maximum, and it is inserted by feeding the solution to a core tank or by withdrawing a control rod, which is called as the transient rod, from the core. In the ramp feed experiment, the supercritical experiment is initiated by feeding the fuel solution to the core tank in a constant feed rate. The data in the present databook consist of datasheets and graphs. Experimental conditions and typical values of measured parameters are tabulated in the datasheet. In the graph, power and temperature profiles are plotted. Those data are useful for the investigation of criticality accidents with fissile solutions, and for validation of criticality accident analysis codes. (author)

  2. TRACY transient experiment databook. 2) ramp withdrawal experiment

    International Nuclear Information System (INIS)

    Nakajima, Ken; Yamane, Yuichi; Ogawa, Kazuhiko; Aizawa, Eiju; Yanagisawa, Hiroshi; Miyoshi, Yoshinori

    2002-03-01

    This is a databook of TRACY ''ramp withdrawal'' experiments. TRACY is a reactor to perform supercritical experiments using low-enriched uranyl nitrate aqueous solution. The excess reactivity of TRACY is 3$ at maximum, and it is inserted by feeding the solution to a core tank or by withdrawing a control rod, which is called as the transient rod, from the core. In the ramp withdrawal experiment, the supercritical experiment is initiated by withdrawing the transient rod from the core in a constant speed using a motor drive system. The data in the present databook consist of datasheets and graphs. Experimental conditions and typical values of measured parameters are tabulated in the datasheet. In the graph, power and temperature profiles are plotted. Those data are useful for the investigation of criticality accidents with fissile solutions, and for validation of criticality accident analysis codes. (author)

  3. Implementation of electron beam position measurement algorithm and embedded web server using MCS-51 microcontroller for Booster Synchrotron

    International Nuclear Information System (INIS)

    Shrivastava, B.B.; Chouhan, Manish; Puntambekar, T.A.; Tiwari, A.N.

    2015-01-01

    The Booster Synchrotron at RRCAT caters as Injector Machine for Indus-1 and Indus-2 with the repetition rate of 1Hz. In Booster Synchrotron, energy of electron bunches are increased from 20 MeV to 450 MeV (in ∼ 280 ms) and 550 MeV (in ∼ 340 ms ) for Indus-1 and Indus-2 respectively. An algorithm for microcontroller based beam position measurement system has been developed for the Booster Synchrotron to measure the fast changes in the beam position of electron bunches during energy ramping. In this paper, software implementation in microcontroller and its optimization to achieve beam position update rate of 1 kHz is discussed. (author)

  4. Lean Application to Manufacturing Ramp-Up

    DEFF Research Database (Denmark)

    Christensen, Irene; Rymaszewska, Anna

    2016-01-01

    . Abstracting from the extant literature, the authors considered the competitiveness of manufacturing companies from two principal perspectives: the leanness of the ramp-up process and the new-value creation of quality managers. While much of the literature fails to acknowledge that the roots of lean actually......This article provides a theoretical overview of the concepts of lean and manufacturing ramp-up in an attempt to conceptualize the strategic areas in which lean philosophy and principles can be applied for continuous improvements. The application of lean principles during the final stage of a new...... product development process, that is, the ramp-up process, is a critical, early enabler of lean manufacturing. The manufacturing strategy literature conceptualizes a state of “leanness in operations,” which can consolidate both the concepts of lean and manufacturing ramp-up, providing a dual perspective...

  5. Startup Ramp Rate Analysis for the OPR1000 Using FALCON Code

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ki-Young; Jung, Sung-hwan; Kim, Yong-Deok [Korea Hydro and Nuclear Power Co. Ltd, Daejeon (Korea, Republic of)

    2015-05-15

    Pelletcladding interaction (PCI) fuel failure results from a combination of mechanical and chemical interactions between the UO2 fuel pellets and Zircaloy cladding. Under restart operation conditions, the pellet-cladding gap may be closed and the differential thermal expansion can result in the stress concentrations on the cladding that may cause the fuel failure. This paper summarizes the PCI sensitivity assessment of the PLUS7 fuel during the OPR1000 startup. The objective of the PCI analysis is to assess the cladding stress state under various power ramp conditions at the peak power node location. Fuel-cladding gap is closed at about 10,000 MWD/MTU burnup. Maximum hoop stress is not sensitive about change of startup ramp rate in 0 - 40% power range. Maximum hoop stress is not sensitive about the intermittent increase(1%) of startup ramp rate in 40 - 100% power range.

  6. Startup Ramp Rate Analysis for the OPR1000 Using FALCON Code

    International Nuclear Information System (INIS)

    Kim, Ki-Young; Jung, Sung-hwan; Kim, Yong-Deok

    2015-01-01

    Pelletcladding interaction (PCI) fuel failure results from a combination of mechanical and chemical interactions between the UO2 fuel pellets and Zircaloy cladding. Under restart operation conditions, the pellet-cladding gap may be closed and the differential thermal expansion can result in the stress concentrations on the cladding that may cause the fuel failure. This paper summarizes the PCI sensitivity assessment of the PLUS7 fuel during the OPR1000 startup. The objective of the PCI analysis is to assess the cladding stress state under various power ramp conditions at the peak power node location. Fuel-cladding gap is closed at about 10,000 MWD/MTU burnup. Maximum hoop stress is not sensitive about change of startup ramp rate in 0 - 40% power range. Maximum hoop stress is not sensitive about the intermittent increase(1%) of startup ramp rate in 40 - 100% power range

  7. Rapid cycling superconducting booster synchrotron

    International Nuclear Information System (INIS)

    Dinev, D.; Agapov, N.; Butenko, A.

    2001-01-01

    The existing set of Nuclotron heavy ion sources, such as duoplasmatron, polarized deuteron, laser and electron beam ion sources permits to have ion beams over a wide range of masses. The main problem for us now is to gain high intensity of accelerator particles. It can be solved by means of multiturn injection of the low current beams into the booster, acceleration up to the intermediate energies, stripping and transferring into the main ring. A design study of this accelerator - the 250 MeV/Amu Nuclotron booster synchrotron at 1 Hz repetition rate and circumference of 84 m, has been completed. The lattice dipole and quadrupole magnets have an iron yoke coils, made of hollow superconductor, are cooled by two-phase Helium flow, as well as the Nuclotron magnets. (authors)

  8. AHF Booster Tracking with SIMPSONS.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, D. E. (David E.); Neri, F. (Filippo)

    2002-01-01

    The booster lattice for the Advanced Hydrotest Facility at Los Alamos was tracked in 3-D with the program SIMPSONS, using the full, symplectic lattice from TEAPOT, using the full set of magnet and misalignment errors, as well as full space-charge effects. The only corrections included were a rough closed-orbit correction and chromaticity correction. The lattice was tracked for an entire booster cycle, from multi-turn injection through acceleration to the top energy of 4 GeV, approximately 99,000 turns. An initial injection intensity of 4x1Ol2, injected in 25 turns, resulted in a final intensity of 3 . 2 {approx} 1 0a' {approx}t 4 GeV. Results of the tracking, including emittance growth, particle loss, and particle tune distributions are presented.

  9. AHF Booster Tracking with SIMPSONS

    International Nuclear Information System (INIS)

    Johnson, D.E.; Neri, F.

    2002-01-01

    The booster lattice for the Advanced Hydrotest Facility at Los Alamos was tracked in 3-D with the program SIMPSONS, using the full, symplectic lattice from TEAPOT, using the full set of magnet and misalignment errors, as well as full space-charge effects. The only corrections included were a rough closed-orbit correction and chromaticity correction. The lattice was tracked for an entire booster cycle, from multi-turn injection through acceleration to the top energy of 4 GeV, approximately 99,000 turns. An initial injection intensity of 4x1Ol2, injected in 25 turns, resulted in a final intensity of 3 . 2 ∼ 1 0a' ∼t 4 GeV. Results of the tracking, including emittance growth, particle loss, and particle tune distributions are presented.

  10. Integral Ramjet Booster Demonstration Program

    Science.gov (United States)

    1975-02-01

    vibration loads before motor firing at -65, +70, and +1650F, (2) The chambers are fabricated from roll and welded ( TIG ) L-605 sheet that is cold...Typical Integral Booster Internal Configuration Keyhole Grain Pressure and Thrust Versus Time (+700F, Sea Level) Keyhole Grain Pressure and...Thrust Versus Time (+1650F, Sea Level) Keyhole Grain Pressure and Thrust Versus Time (-65^, Sea Level) Radial-Slot Grain Design Radial-Slot Grain

  11. Vertical septum magnets for distributing the beam to the 4 PS Booster rings

    CERN Multimedia

    Ordan, Julien Marius

    2017-01-01

    To facilitate H- injection from Linac4 to the PS Booster via the transfer line the BI.SMV10 (Booster Injection Septum Magnet Vertical) provides the vertical deflection of the 160 MeV H- beam to rings 1, 2 and 4 of the Booster. Currently this system is capable of deflecting 50 MeV protons and comprises an assembly of ferrite type magnets in an “omega” section vacuum tank (see fig. 1). The current system shall be replaced with a UHV compatible vacuum chamber incorporating 3 sets of double septum magnets, pulsed from 3 individual power supplies via transformers with 12:1 ratio.

  12. Magnetic field errors tolerances of Nuclotron booster

    Science.gov (United States)

    Butenko, Andrey; Kazinova, Olha; Kostromin, Sergey; Mikhaylov, Vladimir; Tuzikov, Alexey; Khodzhibagiyan, Hamlet

    2018-04-01

    Generation of magnetic field in units of booster synchrotron for the NICA project is one of the most important conditions for getting the required parameters and qualitative accelerator operation. Research of linear and nonlinear dynamics of ion beam 197Au31+ in the booster have carried out with MADX program. Analytical estimation of magnetic field errors tolerance and numerical computation of dynamic aperture of booster DFO-magnetic lattice are presented. Closed orbit distortion with random errors of magnetic fields and errors in layout of booster units was evaluated.

  13. Optimal bidding strategy for microgrids in joint energy and ancillary service markets considering flexible ramping products

    International Nuclear Information System (INIS)

    Wang, Jianxiao; Zhong, Haiwang; Tang, Wenyuan; Rajagopal, Ram; Xia, Qing; Kang, Chongqing; Wang, Yi

    2017-01-01

    Highlights: •Flexible ramping products are modelled in the framework of a microgrid. •Microgrids’ optimal bidding model is proposed in energy and ancillary service markets. •A hybrid stochastic and robust optimization approach is adopted. •The effectiveness of the proposed bidding model is verified based on real-world data. -- Abstract: Due to the volatile nature of wind and photovoltaic power, wind farms and solar stations are generally thought of as the consumers of ramping services. However, a microgrid (MG) is able to strategically integrate various distributed energy resources (DERs) to provide both energy and ancillary services (ASs) for the bulk power system. To evaluate the ramping capabilities of an MG in the joint energy and AS markets, an optimal bidding strategy is developed in this paper considering flexible ramping products (FRPs). By aggregating and coordinating various DERs, including wind turbines (WTs), photovoltaic systems (PVs), micro-turbines (MTs) and energy storage systems (ESSs), the MG is able to optimally allocate the capacities for energy, spinning reserve and ramping. Taking advantage of the synergy among DERs, the MG can maximize its revenues from different markets. Moreover, the flexibility of the MG for the bulk power system can be fully explored. To address the uncertainties introduced by renewable generation and market prices, a hybrid stochastic/robust optimization (RO) approach is adopted. Case studies based on a real-world MG with various DERs demonstrate the market behavior of the MG using the proposed bidding model.

  14. A rookie's guide to Booster operations. Booster technical note no. 231

    Energy Technology Data Exchange (ETDEWEB)

    Zeno, K. [Brookhaven National Lab. (BNL), Upton, NY (United States). Alternating Gradient Synchrotron Dept.

    1998-09-29

    The purpose of the Booster is to act as an injector for the AGS. It accelerates both protons and other ions. Proton acceleration is distinguished from the acceleration of other ions for several reasons. First, the experimental physics associated with protons, called High Energy Physics is different than that associated with other Ions, called Heavy Ion Physics. From the machine perspective, the process of injection of so called Heavy Ions (ions which are not protons), is distinctly different, from that of protons. A different preinjector, or injector for the Booster, is used for each case. For Protons, a 200 MeV Linear accelerator (The Linac) serves as a preinjector; for Heavy Ions, the Tandem Van De Graaf (The Tandem) is the preinjector. An attribute of the circulating beam which determines to a large degree what problems and what type of machine setup is involved is the beam intensity. The author's focus in this guide is on trying to convey the knowledge and experience involved in the operation of the Booster. Many of the problems encountered can be traced back to equipment failures, often power supplies. Although diagnostics are used, there can also be issues with the controls system itself. Problems with the controls system and prevent fixing or even finding a problem with a machine. The issue of improving a machines' performance can often involve trial and error and observations. The hard part is finding the relationships between things in the day to day operation of the machine. Abstractions about physics, information about controls and instrumentation, and purely empirical observations of how the machine behaves are all part of it.

  15. Online Analysis of Wind and Solar Part I: Ramping Tool

    Energy Technology Data Exchange (ETDEWEB)

    Etingov, Pavel V.; Ma, Jian; Makarov, Yuri V.; Subbarao, Krishnappa

    2012-01-31

    To facilitate wider penetration of renewable resources without compromising system reliability concerns arising from the lack of predictability of intermittent renewable resources, a tool for use by California Independent System Operator (CAISO) power grid operators was developed by Pacific Northwest National Laboratory (PNNL) in conjunction with CAISO with funding from California Energy Commission. This tool predicts and displays additional capacity and ramping requirements caused by uncertainties in forecasts of loads and renewable generation. The tool is currently operational in the CAISO operations center. This is one of two final reports on the project.

  16. Development of hydraulic brake actuator for active brake control; Active brake seigyoyo yuatsu booster no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Konishi, Y; Hattori, M. Sugisawa, M.; Nishii, M [Aisin Seiki Co. Ltd., Aichi (Japan)

    1997-10-01

    Recently, application of active brake control systems of the vehicle are increasing. (Vehicle stability control, Panic brake assist ) We have developed a new hydraulic brake actuator for active brake control systems. New hydraulic brake actuator is composed of the three parts. (Hydraulic booster unit, Power supply unit, Control valve unit) This report describes the construction of the new hydraulic booster unit. 2 refs., 10 figs.

  17. Quantum strongly secure ramp secret sharing

    DEFF Research Database (Denmark)

    Zhang, Paul; Matsumoto, Rytaro Yamashita

    2015-01-01

    Quantum secret sharing is a scheme for encoding a quantum state (the secret) into multiple shares and distributing them among several participants. If a sufficient number of shares are put together, then the secret can be fully reconstructed. If an insufficient number of shares are put together...... however, no information about the secret can be revealed. In quantum ramp secret sharing, partial information about the secret is allowed to leak to a set of participants, called an unqualified set, that cannot fully reconstruct the secret. By allowing this, the size of a share can be drastically reduced....... This paper introduces a quantum analog of classical strong security in ramp secret sharing schemes. While the ramp secret sharing scheme still leaks partial information about the secret to unqualified sets of participants, the strong security condition ensures that qudits with critical information can...

  18. Analysis Balance Parameter of Optimal Ramp metering

    Science.gov (United States)

    Li, Y.; Duan, N.; Yang, X.

    2018-05-01

    Ramp metering is a motorway control method to avoid onset congestion through limiting the access of ramp inflows into the main road of the motorway. The optimization model of ramp metering is developed based upon cell transmission model (CTM). With the piecewise linear structure of CTM, the corresponding motorway traffic optimization problem can be formulated as a linear programming (LP) problem. It is known that LP problem can be solved by established solution algorithms such as SIMPLEX or interior-point methods for the global optimal solution. The commercial software (CPLEX) is adopted in this study to solve the LP problem within reasonable computational time. The concept is illustrated through a case study of the United Kingdom M25 Motorway. The optimal solution provides useful insights and guidances on how to manage motorway traffic in order to maximize the corresponding efficiency.

  19. Microprocessor-controlled, programmable ramp voltage generator

    International Nuclear Information System (INIS)

    Hopwood, J.

    1978-11-01

    A special-purpose voltage generator has been developed for driving the quadrupole mass filter of a residual gas analyzer. The generator is microprocessor-controlled with desired ramping parameters programmed by setting front-panel digital thumb switches. The start voltage, stop voltage, and time of each excursion are selectable. A maximum of five start-stop levels may be pre-selected for each program. The ramp voltage is 0 to 10 volts with sweep times from 0.1 to 999.99 seconds

  20. The AGS Booster high frequency rf system

    International Nuclear Information System (INIS)

    Sanders, R.T.; Cameron, P.; Eng, W.; Goldman, M.A.; Jablonski, E.; Kasha, D.; Keane, J.; McNerney, A.; Meth, M.; Plotkin, M.; Puglisi, M.; Ratti, A.; Spitz, R.

    1991-01-01

    A high level rf system, including a power amplifier and cavity, has been designed and built for the AGS Booster. It covers a frequency range of 2.4 to 4.2 MHz and will be used to accelerate high intensity protons. Low intensity polarized protons and heavy ions, to the 1.5 GeV level. A total accelerating voltage of up to 90 kV will be provided by two cavities, each having two gaps. The internally cross coupled, pushpull cavities are driven by an adjacently located power amplifier. In order to accommodate beam intensities up to 0.75 x 10 13 protons per bunch, a low plate resistance power tetrode is used. The tube anode is magnetically coupled to one of the cavity's two parallel cells. The amplifier is a grounded cathode configuration driven by a remotely located solid-state amplifier. It has been tested in the laboratory at full gap voltage with satisfactory results. 5 refs., 2 figs., 1 tab

  1. Booster Long 13 irradiation studies

    Energy Technology Data Exchange (ETDEWEB)

    Leveling, A.; Mokhov, N.; Moore, C.D.; /Fermilab

    1998-06-01

    Extraction from the Booster to the Main Ring occurred at Long Straight 13. The nature of the extraction process was such that 1% to 2% of the beam was lost in this region. There was an appreciable amount of beam extracted as shown in Table 1, which gives the yearly integrated intensities from 1973 to 1997. A simple model of the extraction losses was set up by Chandra Bhat utilizing the program CASIM. A sample output I shown in figure 1 which gives contours of stars/cm3 in the dirt, also schematically depicted are the three six feet deep sampling holes which were drilled to map out this cascade. One aspect of this study has been the study of the production of non-migrating nuclides and further study may in fact yield better values for the K parameter, the probability per star that an atom of the particular nuclide will be produced. Also the results of this study can give experimental numbers for the production of other nuclides when the amount of Na22 has been calculated. However, the most important part of this study has been the determination of the amount of tritium produced by extraction from the Booster and the experimentally determined migration rate. If we look at the top sample result in hole S2 of 777 pCi/ml of tritium and use the experimentally determined rate of migration and the depth to the aquifer of 13.1m, they calculate that the concentration will have decayed away to 1.1E-8 pCi/ml. If we look at the bottom sample, which is 11.3 m away from the aquifer, they calculate that the 116 pCi/ml will have decayed to 5.2E-8 pCi/ml. The conclusions is that the rate of migration determined over the 24 year irradiation history of the Booster extraction point is small enough that there is no problem with migration of tritium to the aquifer.

  2. Field test of coordinated ramp metering (CRM).

    Science.gov (United States)

    2017-03-15

    This project has focused on field implementation and testing of a Coordinated Ramp Metering (CRM) algorithm at California State Route 99 : Northbound corridor in Sacramento between Calvine Road and the SR50 interchange after 12th Ave. It is a 9 mile ...

  3. Hangingwall accomodation styles in flat ramp trust

    NARCIS (Netherlands)

    Mulugeta, G.; Sokoutis, D.

    2003-01-01

    In this paper we study the dynamic and rheologic control of hanging wall accommodation in ramp-flat thrust models. In particular we vary the dimensionless ratio of shear strength to gravity stress to model hanging wall accommodation styles in different materials. In all models we require that the

  4. NSRL Extraction Bump Control in the Booster

    International Nuclear Information System (INIS)

    Brennan, L.

    2008-01-01

    Due to inadequacies in the user interface of the booster orbit control system, a number of new tools were developed. The first priority was an accurate calculation of the winding currents given specific displacements at each extraction septa. Next, the physical limits of the power supplies (±600 amps) needed to be taken into account. In light of this limit, a system is developed that indicates to the user what the allowed values of one bump parameter are once the other two have been specified. Finally, techniques are developed to account for the orbit behavior once power supplies are requested to exceed their ±600 amp limit. This includes a recalculation of bump parameters and a calculation of the amplitude of the residuals. Following this, possible areas for further development are outlined. These techniques were computationally developed in Mathematica and tested in the Methodical Accelerator Design (MAD) program before they were implemented into the control system. At the end, a description of the implementation of these techniques in a new interface is described. This includes a depiction of the appearance and functionality of the graphical user interface, a description of the input and output flow, and an outline of how each important calculation is performed

  5. The AGS Booster vacuum systems

    International Nuclear Information System (INIS)

    Hseuh, H.C.

    1989-01-01

    The AGS Booster is a synchrotron for the acceleration of both protons and heavy ions. The design pressure of low 10 -11 mbar is required to minimize beam loss of the partially stripped heavy ions. To remove contaminants and to reduce outgassing, the vacuum chambers and the components located in them will be chemically cleaned, vacuum fired, baked then treated with nitric oxide. The vacuum sector will be insitu baked to a minimum of 200 degree C and pumped by the combination of sputter ion pumps and titanium sublimation pumps. This paper describes the design and the processing of this ultra high vacuum system, and the performance of some half-cell vacuum chambers. 9 refs., 7 figs

  6. Space Shuttle solid rocket booster

    Science.gov (United States)

    Hardy, G. B.

    1979-01-01

    Details of the design, operation, testing and recovery procedures of the reusable solid rocket boosters (SRB) are given. Using a composite PBAN propellant, they will provide the primary thrust (six million pounds maximum at 20 s after ignition) within a 3 g acceleration constraint, as well as thrust vector control for the Space Shuttle. The drogues were tested to a load of 305,000 pounds, and the main parachutes to 205,000. Insulation in the solid rocket motor (SRM) will be provided by asbestos-silica dioxide filled acrylonitrile butadiene rubber ('asbestos filled NBR') except in high erosion areas (principally in the aft dome), where a carbon-filled ethylene propylene diene monomer-neopreme rubber will be utilized. Furthermore, twenty uses for the SRM nozzle will be allowed by its ablative materials, which are principally carbon cloth and silica cloth phenolics.

  7. 9 CFR 313.1 - Livestock pens, driveways and ramps.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Livestock pens, driveways and ramps... INSPECTION AND CERTIFICATION HUMANE SLAUGHTER OF LIVESTOCK § 313.1 Livestock pens, driveways and ramps. (a) Livestock pens, driveways and ramps shall be maintained in good repair. They shall be free from sharp or...

  8. 40 CFR 1033.520 - Alternative ramped modal cycles.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Alternative ramped modal cycles. 1033... cycles. (a) Locomotive testing over a ramped modal cycle is intended to improve measurement accuracy at... locomotive notch settings. Ramped modal cycles combine multiple test modes of a discrete-mode steady-state...

  9. Impacts of ramping inflexibility of conventional generators on strategic operation of energy storage facilities

    DEFF Research Database (Denmark)

    Nasrolahpour, Ehsan; Kazempour, Jalal; Zareipour, Hamidreza

    2016-01-01

    This paper proposes an approach to assist a pricemaker merchant energy storage facility in making its optimal operation decisions. The facility operates in a pool-based electricity market, where the ramping capability of other resources is limited. Also, wind power resources exist in the system...

  10. Development and testing of an innovative short-term large wind ramp forecasting system

    Energy Technology Data Exchange (ETDEWEB)

    Zack, J.W. [AWS Truepower LLC, Troy, NY (United States)

    2010-07-01

    This PowerPoint presentation discussed a ramp forecasting tool designed for use in a region of Texas with a high wind-generating capacity. Large system-wide ramps frequently occur in the region, and curtailments are common due to transmission constraints. The average hourly load of the power system is 32,101 MW. Wind power capacity in the region is 9382 MW. However, actual production rarely exceeds 6500 MW due to the curtailments. The short-term ramp forecasting tool was designed to aid in grid management decisions for the 0-6 hour ahead period as well as to address issues related to wind farm time series data and the lack of situational awareness information. The tool provided rapid updates for grid point wind analysis with feature detection and tracking algorithms and a rapid update cycle model. The tool also featured a suite of web-based applications that included deterministic ramp even forecasts, power production time series forecasts, and situational awareness products that are updated every 15 minutes. A performance evaluation study of the tool was provided. tabs., figs.

  11. Start-up and ramp-up of the PLT tokamak by lower hybrid waves

    International Nuclear Information System (INIS)

    Jobes, F.C.; Bernabei, S.; Chu, T.K.

    1985-08-01

    Lower hybrid waves have been used on the PLT tokamak both to start the plasma current and to ramp it up from pre-existing levels. The waves, at 800 MHz, were launched from a 6-waveguide grill. The phasing between adjacent guides could be selected electronically, and thus the launched spectrum could be set and changed at will. For start-up, the waveguide phase difference was initially set at 0 0 in order to create a plasma, then switched to 90 0 to drive the current. Over 100 kA of plasma current, at a density of 0.5 to 1 x 10 12 cm -3 , was generated in this manner. Ramp-up experiments were performed under a wide variety of conditions. The most efficient ramp-up was found at the lowest plasma densities and with the fastest launched spectrum (n/sub e/ approx. 2 x 10 12 cm -3 , N/sub parallel/ approx. 1.6 peak); approx.20% of the launched RF power was converted to (increased) poloidal field energy. All of the ramp-up results are in excellent agreement with a theory which determines the efficiency of ramp-up from the consideration of the relative energy losses of the superthermal current-carrying electrons to collisions and to the opposing inductive E-field

  12. Main cycle controls for the AGS Booster synchrotron

    International Nuclear Information System (INIS)

    Culwick, B.B.; Yen, S.

    1991-01-01

    The AGS Booster is a separated function synchrotron with the main excitation coils of the dipoles and quadrupoles connected electrically in series. This circuit is driven by a complex modular power supply with current and voltage reference functions to obtain the desired magnetic fields as a function of time. The dipole cycle is defined by algebraic functions specifying the desired field profile as a function of time. These functions are processed through successive phases to convert to the signals needed to provide the power supply with one current and six voltage references. The user interface and algorithms to derive the control variables are described. 4 refs., 3 figs

  13. 47 CFR 74.733 - UHF translator signal boosters.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false UHF translator signal boosters. 74.733 Section... Translator, and TV Booster Stations § 74.733 UHF translator signal boosters. (a) The licensee of a UHF television broadcast translator station may be authorized to operate one or more signal boosters for the...

  14. Space shuttle booster multi-engine base flow analysis

    Science.gov (United States)

    Tang, H. H.; Gardiner, C. R.; Anderson, W. A.; Navickas, J.

    1972-01-01

    A comprehensive review of currently available techniques pertinent to several prominent aspects of the base thermal problem of the space shuttle booster is given along with a brief review of experimental results. A tractable engineering analysis, capable of predicting the power-on base pressure, base heating, and other base thermal environmental conditions, such as base gas temperature, is presented and used for an analysis of various space shuttle booster configurations. The analysis consists of a rational combination of theoretical treatments of the prominent flow interaction phenomena in the base region. These theories consider jet mixing, plume flow, axisymmetric flow effects, base injection, recirculating flow dynamics, and various modes of heat transfer. Such effects as initial boundary layer expansion at the nozzle lip, reattachment, recompression, choked vent flow, and nonisoenergetic mixing processes are included in the analysis. A unified method was developed and programmed to numerically obtain compatible solutions for the various flow field components in both flight and ground test conditions. Preliminary prediction for a 12-engine space shuttle booster base thermal environment was obtained for a typical trajectory history. Theoretical predictions were also obtained for some clustered-engine experimental conditions. Results indicate good agreement between the data and theoretical predicitons.

  15. Research on recognition of ramp angle based on transducer

    Directory of Open Access Journals (Sweden)

    Wenhao GU

    2015-12-01

    Full Text Available Focusing on the recognition of ramp angle, the relationship between the signal of vehicle transducer and real ramp angle is studied. The force change of vehicle on the ramp, and the relationship between the body tilt angle and front and rear suspension scale is discussed. According to the suspension and tire deformation, error angle of the ramp angle is deduced. A mathematical model is established with Matlab/Simulink and used for simulation to generate error curve of ramp angle. The results show that the error angle increases with the increasing of the ramp angle, and the limit value can reach 6.5%, while the identification method can effectively eliminate this error, and enhance the accuracy of ramp angle recognition.

  16. Tdap Booster Requirements for Secondary Schools

    Science.gov (United States)

    ... Experts State Information Tdap booster requirements for secondary schools State Td or Tdap Mandate for Sec School ... Checklists Standing Orders Storage & Handling Talking with Parents Temperature Logs Top Handouts Translations Vaccine Index >> view all ...

  17. 78 FR 29062 - Signal Booster Rules

    Science.gov (United States)

    2013-05-17

    ... number of FCC rules concerning signal boosters for consumer and industrial use. This document corrects a... chapter; the Maritime Services (ship earth station devices only) pursuant to part 80 of this chapter; and...

  18. Off ramp : a secondary school TDM program

    Energy Technology Data Exchange (ETDEWEB)

    Haq, F. [Better Environmentally Sound Transportation (BEST), Vancouver, BC (Canada)

    2002-07-01

    The cities of Vancouver and Victoria in British Columbia have implemented a high school vehicle trip reduction program entitled Off-Ramp. The program, created by BEST, is about youth empowerment to help youths lead their peers to walk, cycle, skateboard, in-line skate, or carpool to school for a sustainable environment. Students raise awareness through media and drama to counter pop images of driving as being cool. Sponsorship is very important to the success of the program.

  19. Beam instrumentation in the AGS Booster

    International Nuclear Information System (INIS)

    Witkover, R.L.

    1991-01-01

    The AGS Booster was designed to accelerate low intensity (2 x 10 10 ) polarized protons, high intensity (1.5x10 13 ) protons and heavy ions through Au +33 . Coping with this wide range of beams, the 3 x 10 -11 Torr vacuum and the radiation environment presented challenges for the beam monitors. Some of the more interesting instrumentation design and performance during the recent Booster proton commissioning will be described

  20. Gas Test Loop Booster Fuel Hydraulic Testing

    International Nuclear Information System (INIS)

    Gas Test Loop Hydraulic Testing Staff

    2006-01-01

    The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3

  1. Gas Test Loop Booster Fuel Hydraulic Testing

    Energy Technology Data Exchange (ETDEWEB)

    Gas Test Loop Hydraulic Testing Staff

    2006-09-01

    The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3.

  2. New beam instrumentation in the AGS Booster

    International Nuclear Information System (INIS)

    Witkover, R.L.

    1991-01-01

    The AGS Booster was designed to accelerate beams from 2x10 10 polarized protons to 1.5x10 13 protons and heavy ions through Au +33 . The range of beam parameters and the high vacuum, and radiation environment presented challenges for the beam instrumentation. Some interesting beam monitors in the Booster and transport lines, will be described. Where available, results will be presented. 21 refs., 7 figs

  3. Space shuttle booster separation motor design

    Science.gov (United States)

    Smith, G. W.; Chase, C. A.

    1976-01-01

    The separation characteristics of the space shuttle solid rocket boosters (SRBs) are introduced along with the system level requirements for the booster separation motors (BSMs). These system requirements are then translated into specific motor requirements that control the design of the BSM. Each motor component is discussed including its geometry, material selection, and fabrication process. Also discussed is the propellant selection, grain design, and performance capabilities of the motor. The upcoming test program to develop and qualify the motor is outlined.

  4. New beam instrumentation in the AGS Booster

    Energy Technology Data Exchange (ETDEWEB)

    Witkover, R.L.

    1991-01-01

    The AGS Booster was designed to accelerate beams from 2{times}10{sup 10} polarized protons to 1.5{times}10{sup 13} protons and heavy ions through Au{sup +33}. The range of beam parameters and the high vacuum, and radiation environment presented challenges for the beam instrumentation. Some interesting beam monitors in the Booster and transport lines, will be described. Where available, results will be presented. 21 refs., 7 figs.

  5. Design and A.C. loss considerations for the 60 mm dipole magnet in the High Energy Booster

    International Nuclear Information System (INIS)

    Snitchler, G.; Jayakumar, R.; Kovachev, V.; Orrell, D.

    1991-01-01

    The baseline design for the SSC High Energy Booster (HEB) has dipole bending magnets with a 50 mm aperture. A recent dynamic aperture study for the High Energy Booster (HEB) suggests that an increased aperture dipole magnet (DM) is desirable. Two cost neutral options for a 60 mm aperture HEBDM design are investigated. Field transfer function, field harmonics, and relative cost impact for these designs are presented. An analysis of the cryogenic heat load due to A.C. losses generated in the HEB ramp cycle are also reported. Included in this analysis are losses from superconductor hysteresis, yoke hysteresis, strand eddy currents, and cable eddy currents. The A.C. loss impact of 2.5 μm vs. 6 μm filament conductor is presented. Superconducting proximity effect is also considered for 2.5 μm filament conductors

  6. Design and A.C. loss considerations for the 60 mm dipole magnet in the high energy booster

    International Nuclear Information System (INIS)

    Snitchler, G.; Jayakumar, R.; Kovachev, V.; Orrell, D.

    1991-04-01

    The baseline design for the SSC High Energy Booster (HEB) has dipole bending magnets with a 50 mm aperture. A recent dynamic aperture study for the High Energy Booster (HEB) suggests that an increased aperture dipole magnet (DM) is desirable. Two cost neutral options for a 60 mm aperture HEBDM design are investigated. Field transfer function, field harmonics, and relative cost impact for these designs are presented. An analysis of the cryogenic heat and load due to A.C. losses generated in the HEB ramp cycle are also reported. Included in this analysis are losses from superconductor hysteresis, yoke hysteresis, strand eddy currents, and cable eddy currents. The A.C. loss impact of 2.5 μm vs. 6 μm filament conductor will be presented. Superconducting proximity effect is also considered for 2.5 μm filament conductors. 13 refs., 3 figs., 7 tabs

  7. Ramp injector scale effects on supersonic combustion

    Science.gov (United States)

    Trebs, Adam

    The combustion field downstream of a 10 degree compression ramp injector has been studied experimentally using wall static pressure measurement, OH-PLIF, and 2 kHz intensified video filtered for OH emission at 320 nm. Nominal test section entrance conditions were Mach 2, 131 kPa static pressure, and 756K stagnation temperature. The experiment was equipped with a variable length inlet duct that facilitated varying the boundary layer development length while the injector shock structure in relation to the combustor geometry remained nearly fixed. As the boundary within an engine varies with flight condition and does not scale linearly with the physical scale of the engine, the boundary layer scale relative to mixing structures of the engine becomes relevant to the problem of engine scaling and general engine performance. By varying the boundary layer thickness from 40% of the ramp height to 150% of the ramp height, changes in the combustion flowfield downstream of the injector could be diagnosed. It was found that flame shape changed, the persistence of the vortex cores was reduced, and combustion efficiency rose as the incident boundary layer grew.

  8. RF cogging in the FNAL Booster Accelerator

    International Nuclear Information System (INIS)

    William A. Pellico and Robert C. Webber

    2000-01-01

    The Fermilab Booster operates at a Radio Frequency (RF) harmonic number of 84 with beam in all buckets. One or two bunches of beam are systematically lost in the 8 GeV extraction process as beam is swept across a magnetic septum during the extraction kicker rise time. The prompt radiation and component activation resulting from this localized high energy beam loss become serious concerns as Booster beam throughput must be increased more than tenfold to meet the requirements of RUN II, NUMI, and MiniBooNE experiments. Synchronizing a gap in the beam to the firing of the extraction kickers, a relatively easy and standard practice in many machines, can eliminate the problem. This seemingly simple operation is greatly complicated in the Booster by the need to synchronize extraction to beam already circulating in the Main Injector. Coupled with the inflexibility of the Booster resonant magnetic cycle, cycle to cycle variations, and constraints inherent in the accelerator physics, that requirement forces active control of the gap's azimuthal position throughout the acceleration process as the revolution frequency sweeps rapidly. Until recently, the complexities of actually implementing and demonstrating this process in the Booster had not been worked out. This paper describes a successful demonstration of gap cogging in the Booster

  9. Septum magnets for booster ring

    International Nuclear Information System (INIS)

    Mishra, R.K.; Mhaskar, S.P.; Ramamurthi, S.S.

    1991-01-01

    Synchrotron radiation source facility in CAT will employ one septum magnet for the injection of 20 MeV electron beam from the microtron and another septum magnet for the extraction of 700 MeV electron beam from the booster synchrotron. The septum is a boundary that combines or separates the beam by providing the different deflecting fields on either side of this boundary. In this magnet, septum sheet must be as thin as possible to reduce the beam losses and fringing field must be very low. Two septum magnets have been designed, one has 2 mm thick septum sheet for the injection of beam and another one has 3 mm thick septum sheet for the extraction of beam. The field strength of injection and extraction septum magnets, is 0.15 T and 0.88 T respectively. The fringing field near the septum sheet is only 10 G and 30 G for the injection and extraction magnet respectively. The field simulation has been done by computer code PANDIRA. The field homogeneity within gap is ± 0.1%. The design details are discussed in this paper. (author). 4 refs., 1 tab., 1 fig

  10. Electronics for damping transverse instabilities for the Fermilab booster synchrotron

    International Nuclear Information System (INIS)

    Higgins, E.F. Jr.

    1977-01-01

    Transverse instabilities are controlled by an active beam damper which corrects the orbit of individual proton bunches in the Fermilab booster synchrotron. The corrective signals, which are in reality processed versions of the beam pick-up data, are applied to the beam via power amplifier/deflector electrodes approximately one turn after sensing the bunch position. The electronic systems of the damper are configured as a closed-loop feedback arrangement. A brief outline is given of the overall damper system configuration, and the beam position detector, coaxial cable delay system, and data receiver are described

  11. Progress on the IPNS Enriched Uranium Booster Target

    International Nuclear Information System (INIS)

    Knox, A.E.; Carpenter, J.M.; Bailey, J.L.

    1986-09-01

    We describe the Enriched Uranium Booster Target designed for use in Argonne's Intense Pulsed Neutron Source. This report contains a general description of the system, and descriptions of the thermal-hydraulic and loss-of-coolant accident analyses, of the neutronic, criticality and power density calculations, of the assessment of radiation and thermal cycling growth, and of the disk fabrication methods. We also describe the calculations of radionuclide buildup and the related hazards analysis and our calculations of the temperature and stress profiles in the disks, and briefly allude to considerations of security and safeguards

  12. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  13. Integrable RCS as a Proposed Replacement for Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Eldred, Jeffrey [Fermilab; Valishev, Alexander [Fermilab

    2017-03-07

    Integrable optics is an innovation in particle accelerator design that potentially enables a greater betatron tune spread and damps collective instabilities. An integrable rapid-cycling synchrotron (RCS) would be an effective replacement for the Fermilab Booster, as part of a plan to reach multi-MW beam power at 120 GeV for the Fermilab high-energy neutrino program. We provide an example integrable lattice with features of a modern RCS - dispersion-free drifts, low momentum compaction factor, superperiodicity, chromaticity correction, bounded beta functions, and separate-function magnets.

  14. Digital intelligent booster for DCC miniature train networks

    Science.gov (United States)

    Ursu, M. P.; Condruz, D. A.

    2017-08-01

    Modern miniature trains are now driven by means of the DCC (Digital Command and Control) system, which allows the human operator or a personal computer to launch commands to each individual train or even to control different features of the same train. The digital command station encodes these commands and sends them to the trains by means of electrical pulses via the rails of the railway network. Due to the development of the miniature railway network, it may happen that the power requirement of the increasing number of digital locomotives, carriages and accessories exceeds the nominal output power of the digital command station. This digital intelligent booster relieves the digital command station from powering the entire railway network all by itself, and it automatically handles the multiple powered sections of the network. This electronic device is also able to detect and process short-circuits and overload conditions, without the intervention of the digital command station.

  15. Non-Cooperative Regulation Coordination Based on Game Theory for Wind Farm Clusters during Ramping Events

    DEFF Research Database (Denmark)

    Qi, Yongzhi; Liu, Yutian; Wu, Qiuwei

    2017-01-01

    With increasing penetration of wind power in power systems, it is important to track scheduled wind power output as much as possible during ramping events to ensure security of the system. In this paper, a non‐cooperative coordination strategy based on the game theory is proposed for the regulation...... of the regulation revenue function according to the derived Nash equilibrium condition, the ER strategy is the Nash equilibrium of the regulation competition. Case studies were conducted with the power output data of wind farms from State Grid Jibei Electric Power Company Limited of China to demonstrate...

  16. Ramping Performance Analysis of the Kahuku Wind-Energy Battery Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Corbus, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-11-01

    High penetrations of wind power on the electrical grid can introduce technical challenges caused by resource variability. Such variability can have undesirable effects on the frequency, voltage, and transient stability of the grid. Energy storage devices can be an effective tool in reducing variability impacts on the power grid in the form of power smoothing and ramp control. Integrating anenergy storage system with a wind power plant can help smooth the variable power produced from wind. This paper explores the fast-response, megawatt-scale, wind-energy battery storage systems that were recently deployed throughout the Hawaiian islands to support wind and solar projects.

  17. Receptor activity modifying proteins (RAMPs) interact with the VPAC1 receptor: evidence for differential RAMP modulation of multiple signalling pathways

    International Nuclear Information System (INIS)

    Christopoulos, G.; Morfis, M.; Sexton, P.M.; Christopoulos, A.; Laburthe, M.; Couvineau, A.

    2001-01-01

    Full text: Receptor activity modifying proteins (RAMP) constitute a family of three accessory proteins that affect the expression and/or phenotype of the calcitonin receptor (CTR) or CTR-like receptor (CRLR). In this study we screened a range of class II G protein-coupled receptors (PTH1, PTH2, GHRH, VPAC1, VPAC2 receptors) for possible RAMP interactions by measurement of receptor-induced translocation of c-myc tagged RAMP1 or HA tagged RAMP3. Of these, only the VPAC1 receptor caused significant translocation of c-myc-RAMP1 or HA-RAMP3 to the cell surface. Co-transfection of VPAC1 and RAMPs did not alter 125 I-VIP binding and specificity. VPAC1 receptor function was subsequently analyzed through parallel determinations of cAMP accumulation and phosphoinositide (PI) hydrolysis in the presence and absence of each of the three RAMPs. In contrast to CTR-RAMP interaction, where there was an increase in cAMP Pharmacologisand a decrease in PI hydrolysis, VPAC1-RAMP interaction was characterized by a specific increase in agonist-mediated PI hydrolysis when co-transfected with RAMP2. This change was due to an enhancement of Emax with no change in EC 50 value for VIP. No significant change in cAMP accumulation was observed. This is the first demonstration of an interaction of RAMPs with a G protein-coupled receptor outside the CTR family and may suggest a more generalized role for RAMPs in modulating G protein-coupled receptor signaling. Copyright (2001) Australasian Society of Clinical and Experimental Pharmacologists and Toxicologists

  18. Modelling of fission gas release in rods from the International DEMO-RAMP-II Project at Studsvik

    International Nuclear Information System (INIS)

    Malen, K.

    1983-01-01

    The DEMO-RAMP-II rods had a burn-up of 25-30 MWd/kg U. They were ramped to powers in the range 40-50 kW/m with hold times between 10 s and 4.5 minutes. In spite of the short hold times the fission gas release at the higher powers was more than 1%. With these short hold times it is natural to assume that mixing of released gas with plenum gas is limited. Modelling has been performed using GAPCONSV (a modified GAPCON-THERMAL-2) both with and without mixing of released gas with plenum gas. In particular for the high power-short duration ramps only the ''no mixing'' modelling yields release fractions comparable to the experimental values. (author)

  19. Ramp discharge in Z-pinch

    Energy Technology Data Exchange (ETDEWEB)

    Gaber, W.H.; Beshara, A.B.; El-Bialy, A.B.; Masoud, M.M. [Plasma and Nuclear Fusion Dept., N.R.C., Atomic Energy Authority, Enshass (Egypt)

    2004-07-01

    A ramp Z-pinch discharge is designed and built in order to increase the pinch ratio and obtain a maximum contraction, and to increase the temperature. The discharge chamber is a cylindrical Pyrex tube of 25 cm long, 18.5 cm, 20 cm inner and outer diameter and two circular Aluminum plates of radius 15 cm separated by 21 cm are inserted into the tube. The tube is filled with He gas at 0.1 mbar. Two capacitor banks are used, the first bank 30 {mu}F and the second fast bank 1.3 {mu}F. The charging voltage was 8 kV for both banks. The discharge current and voltage of each bank are measured by potential divider and Rogowski coil respectively. Also the plasma inductance and resistance are obtained for each case. The plasma inductance has its peak value 300 nH at 4 {mu}s, while the plasma resistance has it minimum 8 m{omega} at the same time in the case of conventional discharge (single bank). In the case of ramp discharge, the inductance has two peaks 440 nH, 380 nH at 4 {mu}s, 9.5 {mu}s respectively, while the resistance has two minimum 4 m{omega}, 20 m{omega} at at 4 {mu}s, 9.5 {mu}s respectively. The temperature has been measure spectroscopically by using relative continuum intensity ratio method. The temperature has its peak value 38 eV at 4 {mu}s for single bank case, while it larger peak value 55 eV for ramp case. (orig.)

  20. Off-bucket Proton Losses during Ramping

    CERN Document Server

    Catalan-Lasheras, N

    1998-01-01

    In this paper, we report a study undertaken to determine whether longitudinal and transverse amplitudes become coupled before the loss of the off-bucket protons during the ramp. We compute the synchro tron as well as the betatron tune changes with momentum and determine if synchro-betatron resonances blow-up the transverse particle amplitude. A strong coupling might allow a betatron cleaning of the se particles before they are outside the momentum acceptance of the machine. We show that this is not the case, justifying the need of momentum cleaning.

  1. Ramp - Metering Algorithms Evaluated within Simplified Conditions

    Science.gov (United States)

    Janota, Aleš; Holečko, Peter; Gregor, Michal; Hruboš, Marián

    2017-12-01

    Freeway networks reach their limits, since it is usually impossible to increase traffic volumes by indefinitely extending transport infrastructure through adding new traffic lanes. One of the possible solutions is to use advanced intelligent transport systems, particularly ramp metering systems. The paper shows how two particular algorithms of local and traffic-responsive control (Zone, ALINEA) can be adapted to simplified conditions corresponding to Slovak freeways. Both control strategies are modelled and simulated using PTV Vissim software, including the module VisVAP. Presented results demonstrate the properties of both control strategies, which are compared mutually as well as with the initial situation in which no control strategy is applied

  2. Ramp - Metering Algorithms Evaluated within Simplified Conditions

    Directory of Open Access Journals (Sweden)

    Janota Aleš

    2017-12-01

    Full Text Available Freeway networks reach their limits, since it is usually impossible to increase traffic volumes by indefinitely extending transport infrastructure through adding new traffic lanes. One of the possible solutions is to use advanced intelligent transport systems, particularly ramp metering systems. The paper shows how two particular algorithms of local and traffic-responsive control (Zone, ALINEA can be adapted to simplified conditions corresponding to Slovak freeways. Both control strategies are modelled and simulated using PTV Vissim software, including the module VisVAP. Presented results demonstrate the properties of both control strategies, which are compared mutually as well as with the initial situation in which no control strategy is applied

  3. Ramp metering with an objective to reduce fuel consumption

    OpenAIRE

    Vreeswijk, Jacob Dirk; Woldeab, Zeremariam; de Koning, Anne; Bie, Jing

    2011-01-01

    Ramp meters successfully decrease congestion but leave a burden on the traffic situation at on-ramps. Chaotic queuing leads to many stop-and-go movements and causes inefficiency where fuel consumption is concerned. As part of the eCoMove project, complementary strategies are being designed and evaluated to reduce fuel consumption at metered on-ramps, using vehicle-to-infrastructure communication. This paper presents the design of two strategies, as well as their effect as derived from simulat...

  4. LHC Report: Intensity ramp-up

    CERN Multimedia

    Mike Lamont for the LHC Team

    2012-01-01

    The first stable beams at 4 TeV were declared on Thursday, 5 April with 3 bunches per beam. This marked the start of the intensity ramp-up, which aims to get back up to 1380 bunches per beam as quickly as is safely possible.   The next couple of days saw fills with 47, 84 and 264 bunches per beam and on Sunday, 8 April the move was made to 624 bunches. With the squeeze to 60 cm in place, 624 bunches with reasonably high bunch intensities of around 1.3 to 1.4 x1011 protons per bunch have already yielded respectable peak luminosities of up to 2.5 x1033 cm-2s-1. Following a lot of hard work during the Christmas technical stop, machine availability is very good at the moment. The ramp-up in the number of bunches is accompanied by a series of checks aimed to make sure the machine protection systems and operational procedures are in a good enough shape to safely deal with the beam intensity. 624 bunches at 4 TeV already represents an energy over 50 MJ and serious damage potential. The next few days sh...

  5. Accelerating RF cavity of the Booster

    CERN Multimedia

    CERN PhotoLab

    1981-01-01

    Each of the 4 PS Booster rings has a single accelerating cavity. It consists of 2 quarter-wave ferrite-loaded resonators. There are 2 figure-of-eight loops on the ferrite loads for tuning the frequency throughout the acceleration cycle, from 3 to 8 MHz (from 50 MeV at injection to the original Booster energy of 800 MeV, 2 GeV today). The cavities have a flat design, to fit the ring-to-ring distance of 36 cm. The tube for forced-air cooling is visible in the left front. See also 8301084.

  6. The AGS Booster Beam Position Monitor system

    International Nuclear Information System (INIS)

    Ciardullo, D.J.; Abola, A.; Beadle, E.R.; Smith, G.A.; Thomas, R.; Van Zwienen, W.; Warkentien, R.; Witkover, R.L.

    1991-01-01

    To accelerate both protons and heavy ions, the AGS Booster requires a broadband (multi-octave) beam position monitoring system with a dynamic range spanning several orders of magnitude (2 x 10 10 to 1.5 x 10 13 particles per pulse). System requirements include the ability to acquire single turn trajectory and average orbit information with ± 0.1 mm resolution. The design goal of ± 0.5 mm corrected accuracy requires that the detectors have repeatable linear performance after periodic bakeout at 300 degree C. The system design and capabilities of the Booster Beam Position Monitor will be described, and initial results presented. 7 refs., 5 figs

  7. Progress on the Design of a Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Madrak, R. L. [Fermilab; Dey, J. E. [Fermilab; Duel, K. L. [Fermilab; Kuharik, J. C. [Fermilab; Pellico, W. A. [Fermilab; Reid, J. S. [Fermilab; Romanov, G. [Fermilab; Slabough, M. [Fermilab; Sun, D. [Fermilab; Tan, C. Y. [Fermilab; Terechkine, I. [Fermilab

    2016-10-01

    perpendicularly biased 2nd harmonic cavity is being designed and built for the Fermilab Booster. Its purpose is to flatten the bucket at injection and thus change the longitudinal beam distribution to decrease space charge effects. It can also help at extraction. The cavity frequency range is 76 – 106 MHz. The power amplifier will be built using the Y567B tetrode, which is also used for the fundamental mode cavities in the Fermilab Booster. We discuss recent progress on the cavity, the biasing solenoid design and plans for testing the tuner's garnet material

  8. Design of the Zero Gradient Synchrotron Booster-II lattice

    International Nuclear Information System (INIS)

    Crosbie, E.A.; Foss, M.H.; Khoe, T.K.; Simpson, J.D.

    1975-01-01

    A 500 MeV booster was designed at the Argonne National Laboratory to increase the beam intensity from the Zero Gradient Synchrotron (ZGS). Many turns of H - ions from the 50 MeV linac will be injected into the booster and stripped to H + so that the ring will contain the maximum useful charge in each booster pulse. Several booster pulses will be injected into the ZGS to form one ZGS pulse. This machine is now under construction. (auth)

  9. 30 CFR 57.8518 - Main and booster fans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Main and booster fans. 57.8518 Section 57.8518... and Underground § 57.8518 Main and booster fans. (a) All mine main and booster fans installed and used...-cycle shutdowns or planned or scheduled fan maintenance or fan adjustments where air quality is...

  10. Present state of tandem superconductive booster of JAERI

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, Suehiro; Matsuda, Makoto; Kanazawa, Shuhei; Yoshida, Tadashi; Ouchi, Isao; Shoji, Tokio [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1996-12-01

    The superconductive booster constructed rear-stage accelerator of the tandem accelerator of the Tokai Research Establishment, JAERI (Japan Atomic Energy Research Institute), was completed in construction of its whole system on October, 1993, and through its beam accelerating test and remodulation its design characteristics were established on September, 1994. From November, 1994 to April, 1995 a repulsion-forming nuclear isolation apparatus was installed to modulate at target room, and was begun to use on June, 1995. The beam reaccelerated at the booster was used mainly for nuclear spectroscopy experiment, a collaborative research was developed using mini-crystal balls made by collecting from University of Tsukuba and so forth. The accelerating part of the booster is a phase independent setting type Linac consisting of 40 niobium superconducting holes with 1/4 wave-length type and 130 MHz in frequency, in which a hole can form 5 MV/m of accelerating electric field for 4 W of radio frequency spent power of 0.75 MV of accelerating voltage per hole, to form 30 MV of voltage in a whole. 4 holes are contained into each 10 cryostats, respectively. In accelerating tests, Si, Cl, Ni, Ge, Ag, I and Au ions are accelerated to establish 30 mV of total accelerating voltage in its design value, which reaches to their expected energy characteristics. Its used days in this year are 25 days after beginning of its use, and operating days of the cooling apparatus was 135 days in total. (G.K.)

  11. The impact of product complexity on ramp-up performance

    NARCIS (Netherlands)

    Pufall, A.A.; Fransoo, J.C.; Jong, de A.; Kok, de A.G.

    2012-01-01

    Fast product ramp-ups are crucial in consumer electronics because short product lifecycles prevail and profit margins diminish rapidly over time. Yet many companies fail to meet their volume, cost and quality targets and the ramp-up phase remains largely unexplored in new product and supply chain

  12. Status of design, development and test of the dipole magnets for the high energy booster

    International Nuclear Information System (INIS)

    Butler, J.M.; Boulios, G.; Finger, K.; Kaylor, L.; McConnon, A.; McConnon, S.; Osborne, S.; Sinnott, Z.; Pisz, F.; Swenson, C.

    1994-01-01

    Westinghouse Magnet Systems Division has a contract to design, develop, build and test the superconducting dipole magnets for the High Energy Booster. This paper covers the key requirements of the magnet and the design features to meet these requirements. Although similar to the Collider dipole magnets, there are some key differences in the functional requirements and design constraints which lead to design differences. Most significant is the requirement to prevent quench during bipolar operation at a ramp rate of 62 A/s compared to unipolar operation at 4 A/s for the Collider. Testing of 50 mm magnets made for the SSCL string test show that the design is sensitive to interstrand eddy currents and resultant heating at the higher ramp rate. The cryostat diameter is not constrained by the fixed distance between top and bottom rings as in the Collider. The authors are taking advantage of the additional space allowed. Emphasis in this paper is placed on the design differences and the reasons for them in both the cold mass and the cryostat. The cold testing requirements and plans for test facilities to carry out the tests are summarized

  13. Fast current ramp experiments on TFTR

    International Nuclear Information System (INIS)

    Fredrickson, E.D.; McGuire, K.; Goldston, R.J.

    1987-05-01

    Electron heat transport on TFTR and other tokamaks is several orders of magnitude larger than neoclassical calculations would predict. Despite considerable effort, there is still no clear theoretical understanding of this anomalous transport. The electron temperature profile T/sub e/(r), shape has shown a marked consistency on many machines, including TFTR, for a wide range of plasma parameters and heating profiles. This could be an important clue as to the process responsible for this enhanced thermal transport. In this paper 'profile consistency' in TFTR is described and an experiment which uses a fast current ramp to transiently decouple the current density profile J(r), and the T/sub e/(r) profiles is discussed. From this experiment the influence of J(r) on electron temperature profile consistency can be determined

  14. Energy-efficient operation of a booster RF system for Taiwan light source operated in top-up mode

    International Nuclear Information System (INIS)

    Yeh, Meng-Shu; Wang, Chaoen; Chang, Lung-Hai; Chung, Fu-Tsai; Yu, Tsung-Chi; Lin, Ming-Chyuan; Chen, Ling-Jhen; Yang, Tz-Te; Chang, Mei-Hsia; Lin, Yu-Han; Tsai, Ming-Hsun; Lo, Chih-Hung; Liu, Zong-Kai

    2015-01-01

    Contemporary light sources operate in a top-up mode to maintain their photon intensity quasi-constant so as to improve significantly the thermal stability of the photon beam and to maximize ultimately the average photon flux at a designed maximum operational beam current. Operating in a top-up mode requires frequent beam injection from the synchrotron booster to the storage ring of the light source, but the injection intervals occupy only a tiny portion of the operational time of the integrated machine. To maintain a high operational reliability, the booster RF system practically operates necessarily under injection conditions around the clock and consumes full electric power whether during top-up injection or not. How to decrease the power consumption of the booster RF system during its stand-by time but not to sacrifice the reliability and availability of the RF system is obviously of fundamental interest for routine operation of the light source in a top-up mode. Here, an energy-efficient operation of a booster RF system adaptive to top-up operation of a light source is proposed that has been developed, realized and integrated into the booster RF system of the Taiwan Light Source (TLS), and routinely operated since the end of year 2008. The klystron cathode current and RF gap voltage of the booster's accelerating RF cavity are both periodically modulated to adapt the injection rhythm during top-up operation, which results in decreased consumption of electric power of the booster RF system by more than 78%. The impact on the reliability and availability of the booster RF system has been carefully monitored during the past five operational years, delivering more than 5000 h scheduled user beam time per year. The booster RF system retains its excellent reliability and availability as previously. Neither a decrease of the service time nor an induced reliability issue from the klystron or any high-power high-voltage component of the transmitter has been

  15. Cabling design of booster and storage ring construction progress of TPS

    International Nuclear Information System (INIS)

    Wong, Y.-S.; Liu, K.-B.; Liu, C.-Y.; Wang, B.-S.

    2017-01-01

    The 2012 Taiwan Photon Source (TPS) cable construction project started after 10 months to complete the cable laying and installation of power supply. The circumference of the booster ring (BR) is 496.8 m, whereas that of the storage ring (SR) is 518.4 m. Beam current is set to 500 mA at 3.3 GeV. The paper on grounding systems discusses the design of the ground wire (< 0.2 Ω) with low impedance, power supply of the accelerator and cabling tray. The flow and size of the ground current are carefully evaluated to avoid grounded current from flowing everywhere, which causes interference problems. In the design of the TPS, special shielding will be established to isolate the effects of electromagnetic interference on the magnet and ground current. Booster ring dipoles are connected by a series of 54-magnet bending dipole; the cable size of its stranded wire measures 250 mm"2, with a total length of 5000 m. Booster ring and storage ring quadrupoles have 150 magnets; the cable size of their stranded wire is 250 mm"2, with a total length of 17000 m. Storage ring dipole consists of 48 magnets; the cable size of its stranded wire is 325 mm"2, with a total length of 6000 m. This study discusses the power supply cabling design of the storage ring and booster ring construction progress of TPS. The sections of this paper are divided into discussions of the construction of the control and instrument area, cabling layout of booster ring and storage ring, as well as the installation and commission machine. This study also discusses the use of a high-impedance meter to determine the effect of cabling insulation and TPS power supply machine on energy transfer to ensure the use of safe and correct magnet.

  16. Space Launch System Accelerated Booster Development Cycle

    Science.gov (United States)

    Arockiam, Nicole; Whittecar, William; Edwards, Stephen

    2012-01-01

    With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study

  17. Pressure-Equalizing Cradle for Booster Rocket Mounting

    Science.gov (United States)

    Rutan, Elbert L. (Inventor)

    2015-01-01

    A launch system and method improve the launch efficiency of a booster rocket and payload. A launch aircraft atop which the booster rocket is mounted in a cradle, is flown or towed to an elevation at which the booster rocket is released. The cradle provides for reduced structural requirements for the booster rocket by including a compressible layer, that may be provided by a plurality of gas or liquid-filled flexible chambers. The compressible layer contacts the booster rocket along most of the length of the booster rocket to distribute applied pressure, nearly eliminating bending loads. Distributing the pressure eliminates point loading conditions and bending moments that would otherwise be generated in the booster rocket structure during carrying. The chambers may be balloons distributed in rows and columns within the cradle or cylindrical chambers extending along a length of the cradle. The cradle may include a manifold communicating gas between chambers.

  18. Validation and Refinement of Prediction Models to Estimate Exercise Capacity in Cancer Survivors Using the Steep Ramp Test

    NARCIS (Netherlands)

    Stuiver, Martijn M.; Kampshoff, Caroline S.; Persoon, Saskia; Groen, Wim; van Mechelen, Willem; Chinapaw, Mai J. M.; Brug, Johannes; Nollet, Frans; Kersten, Marie-José; Schep, Goof; Buffart, Laurien M.

    2017-01-01

    Objective: To further test the validity and clinical usefulness of the steep ramp test (SRT) in estimating exercise tolerance in cancer survivors by external validation and extension of previously published prediction models for peak oxygen consumption (Vo2(peak)) and peak power output (W-peak).&

  19. Operational behaviour of CO{sub 2} booster systems; Betriebsverhalten von CO{sub 2}-Booster-Systemen

    Energy Technology Data Exchange (ETDEWEB)

    Javerschek, Oliver; Hieble, Tobias [BITZER Kuehlmaschinenbau GmbH, Sindelfingen (Germany)

    2011-07-01

    The operating characteristics of booster systems and the resulting operating conditions of CO{sub 2} booster systems in supermarket refrigeration are explained and discussed. Criteria and challenges of different operating and load conditions are gone into. Simulated and measured operating states of a small-scale booster system are compared and evaluated. [German] In der vorliegenden Veroeffentlichung werden unterschiedliche Betriebsverhalten und die daraus resultierenden Betriebsbedingungen von CO{sub 2}-Booster-Systemen in der Supermarktkaelte erlaeutert und diskutiert. Dabei werden wesentliche Kriterien und Herausforderungen bei den unterschiedlichen Betriebs- und Lastbedingungen besprochen. Ausserdem werden simulierte und gemessene Betriebszustaende einer kleinen Booster-Kaelteanlage vergleichend betrachtet und bewertet.

  20. Investigation of the McDonnell-Douglas orbiter and booster shuttle models in proximity at Mach numbers 2.0 to 6.0. Volume 7: Proximity data at Mach 4 and 6, interference free and launch vehicle data

    Science.gov (United States)

    Trimmer, L. L.; Love, D. A.; Decker, J. P.; Blackwell, K. L.; Strike, W. T.; Rampy, J. M.

    1972-01-01

    Aerodynamic data obtained from a space shuttle abort stage separation wind tunnel test are presented. The .00556 scale models of the orbiter and booster configuration were tested in close proximity using dual balances during the time period of April 21 to April 27 1971. Data were obtained for both booster and orbiter over an angle of attack range from -10 to 10 deg for zero degree sideslip angle. The models were tested at several relative incidence angles and separation distances and power conditions. Plug nozzles utilizing air were used to simulate booster and orbiter plumes at various altitudes along a nominal ascent trajectory. Powered conditions were 100, 50, 25 and 0 percent of full power for the orbiter and 100, 50 and 0 percent of full power for the booster. Pitch control effectiveness data were obtained for both booster and orbiter with power on and off. In addition, launch vehicle data with and without booster power were obtained utilizing a single balance in the booster model. Data were also obtained with the booster canard off in close proximity and for the launch configuration.

  1. Local linear heat rate ramps in the WWER-440 transient regimes

    International Nuclear Information System (INIS)

    Brik, A.N.; Bibilashvili, Ju.L.; Bogatyr, S.M.; Medvedev, A.V.

    1998-01-01

    The operation of the WWER-440 reactors must be accomplished in such a way that the fuel rods durability would be high enough during the whole operation period. The important factors determining the absence of fuel rod failures are the criteria limiting the core characteristics (fuel rod and fuel assembly power, local linear heat rate, etc.). For the transient and load follow conditions the limitations on the permissible local linear rate ramp are also introduced. This limitation is the result of design limit of stress corrosion cracking of the fuel cladding and depends on the local fuel burn-up. The control rod motion is accompanied by power redistribution, which, in principle, can result in violating the design and operation limitations. Consequently, this motion have to be such as the core parameters, including the local ramps of the linear heat generation rates would not exceed the permissible ones.The paper considers the problem of WWER-440 reactor control under transient and load follow conditions and the associated optimisation of local linear heat generation rate ramps. The main factors affecting the solution of the problem under consideration are discussed. Some recommendations for a more optimal reactor operation are given.(Author)

  2. Numerically controlled oscillator for the Fermilab Booster

    International Nuclear Information System (INIS)

    Crisp, J.L.; Ducar, R.J.

    1989-01-01

    In order to improve the stability of the Fermilab Booster low level rf system, a numerically controlled oscillator system is being constructed. Although the system has not been implemented to date, the design is outlined in this paper. The heart of the new system consists of a numerically synthesized frequency generator manufactured by the Sciteq Company. The 3 GHz/sec rate and 30 to 53 MHz range of the Booster frequency program required the design of a CAMAC based, fast-cycling (1 MHz), 65K x 32 bit, digital function generator. A 1 MHz digital adder and 12 bit analog to digital converter will be used to correct small program errors by phase locking the oscillator to the beam. 6 refs., 1 fig

  3. LMFBR with booster pump in pumping loop

    International Nuclear Information System (INIS)

    Rubinstein, H.J.

    1975-01-01

    A loop coolant circulation system is described for a liquid metal fast breeder reactor (LMFBR) utilizing a low head, high specific speed booster pump in the hot leg of the coolant loop with the main pump located in the cold leg of the loop, thereby providing the advantages of operating the main pump in the hot leg with the reliability of cold leg pump operation

  4. Results from the AGS Booster transverse damper

    International Nuclear Information System (INIS)

    Russo, D.; Brennan, M.; Meth, M.; Roser, T.

    1993-01-01

    To reach the design intensity of 1.5 x 10 13 protons per pulse in the AGS Booster, transverse coupled bunch instabilities with an estimated growth rate of 1500s -1 have to be dampened. A prototype transverse damper has been tested successfully using a one turn digital delay and closed orbit suppression implemented in a programmable gate array. An updated damper, which includes an algorithm to optimize damping for a changing betatron rune, will also be presented

  5. Measuring target for the PS Booster

    CERN Multimedia

    1971-01-01

    The measuring target for the PS Booster (originally 800 MeV, now 1.4 GeV). It measures the size of the beam by destroying all particles with amplitudes greater than the size of the fork, the position and width of which are adjustable. The plunging time is only 20 ms and the acceleration at the tip of the fork reaches 90 g. The servo-controlled linear motor is shown detached from the mechanism. See also 7602008.

  6. SNS RING STUDY AT THE AGS BOOSTER.

    Energy Technology Data Exchange (ETDEWEB)

    ZHANG, S.Y.; AHRENS, L.; BEEBE-WANG, J.; BLASKIEWICZ, M.; FEDOTOV, A.; GARDNER, C.; LEE, Y.Y.; LUCCIO, A.; MALITSKY, N.; ROSER, T.; WENG, W.T.; WEI, J.; ZENO, K.; REECE, K.; WANG, J.G.

    2000-06-30

    During the g-2 run at the BNL AGS in early 2000, a 200 MeV storage-ring-like magnetic cycle has been set-up and tuned at the Booster in preparing for the Spallation Neutron Source (SNS) accumulator ring study. In this article, we report the progress of the machine set-up, tuning, some preliminary studies, and the future plan.

  7. Improving short-term forecasting during ramp events by means of Regime-Switching Artificial Neural Networks

    Science.gov (United States)

    Gallego, C.; Costa, A.; Cuerva, A.

    2010-09-01

    Since nowadays wind energy can't be neither scheduled nor large-scale storaged, wind power forecasting has been useful to minimize the impact of wind fluctuations. In particular, short-term forecasting (characterised by prediction horizons from minutes to a few days) is currently required by energy producers (in a daily electricity market context) and the TSO's (in order to keep the stability/balance of an electrical system). Within the short-term background, time-series based models (i.e., statistical models) have shown a better performance than NWP models for horizons up to few hours. These models try to learn and replicate the dynamic shown by the time series of a certain variable. When considering the power output of wind farms, ramp events are usually observed, being characterized by a large positive gradient in the time series (ramp-up) or negative (ramp-down) during relatively short time periods (few hours). Ramp events may be motivated by many different causes, involving generally several spatial scales, since the large scale (fronts, low pressure systems) up to the local scale (wind turbine shut-down due to high wind speed, yaw misalignment due to fast changes of wind direction). Hence, the output power may show unexpected dynamics during ramp events depending on the underlying processes; consequently, traditional statistical models considering only one dynamic for the hole power time series may be inappropriate. This work proposes a Regime Switching (RS) model based on Artificial Neural Nets (ANN). The RS-ANN model gathers as many ANN's as different dynamics considered (called regimes); a certain ANN is selected so as to predict the output power, depending on the current regime. The current regime is on-line updated based on a gradient criteria, regarding the past two values of the output power. 3 Regimes are established, concerning ramp events: ramp-up, ramp-down and no-ramp regime. In order to assess the skillness of the proposed RS-ANN model, a single

  8. Momentum Cogging at the Fermilab Booster

    International Nuclear Information System (INIS)

    Seiya, K.; Drennan, C.C.; Pellico, W.; Triplett, A.K.; Waller, A.M.

    2012-01-01

    The Fermilab Booster has an upgrade plan called the Proton Improvement Plan (PIP). The flux throughput goal is 2E17 protons/hour which, is almost double the present flux, 1.1E17 protons/hour. The beam loss in the machine is going to be an issue. The Booster accelerates beam from 400 MeV to 8 GeV and extracts to the Main Injector (MI). The current cogging process synchronizes the extraction kicker gap to the MI by changing radial position of the beam during the cycle. The gap creation occurs at about 700 MeV, which is about 6 ms into the cycle. The cycle-to-cycle variations of the Booster are larger at lower energy. However, changing the radial position at low energy for cogging is limited because of aperture. Momentum cogging is able to move the gap creation to an earlier time by using dipole correctors and radial position feedback, and is able to control the revolution frequency and radial position at the same time. The new cogging is expected to reduce beam loss and not be limited by aperture. The progress of the momentum cogging system development is going to be discussed in this paper.

  9. LHC Report: Ramp-up complete

    CERN Multimedia

    Mike Lamont for the LHC Team

    2012-01-01

    The intensity ramp-up outlined in the last Bulletin continued more or less as planned, with some steady running with 1092 bunches followed by the final step-up to 1380 – the maximum number of bunches for the year.   Monday, 16 April was spent performing luminosity calibration. Under carefully controlled conditions and a special beam configuration, the experiments' luminosity measurements were calibrated against a measurement of the accelerator’s absolute luminosity obtained with Van der Meer scans. These scans give the beam sizes at the interaction point which, together with an accurate measurement of the beam and bunch currents (and other more subtle considerations), allow a precise measurement of the absolute luminosity. With the Van der Meer scans out of the way, the final step-up in the number of bunches to 1380 was made. This has resulted in an average peak luminosity of around 5.6x1033 cm-2s-1 in the general-purpose detectors (ATLAS and CMS have yet to publish th...

  10. Accelerating Science Driven System Design With RAMP

    Energy Technology Data Exchange (ETDEWEB)

    Wawrzynek, John [Univ. of California, Berkeley, CA (United States)

    2015-05-01

    Researchers from UC Berkeley, in collaboration with the Lawrence Berkeley National Lab, are engaged in developing an Infrastructure for Synthesis with Integrated Simulation (ISIS). The ISIS Project was a cooperative effort for “application-driven hardware design” that engages application scientists in the early parts of the hardware design process for future generation supercomputing systems. This project served to foster development of computing systems that are better tuned to the application requirements of demanding scientific applications and result in more cost-effective and efficient HPC system designs. In order to overcome long conventional design-cycle times, we leveraged reconfigurable devices to aid in the design of high-efficiency systems, including conventional multi- and many-core systems. The resulting system emulation/prototyping environment, in conjunction with the appropriate intermediate abstractions, provided both a convenient user programming experience and retained flexibility, and thus efficiency, of a reconfigurable platform. We initially targeted the Berkeley RAMP system (Research Accelerator for Multiple Processors) as that hardware emulation environment to facilitate and ultimately accelerate the iterative process of science-driven system design. Our goal was to develop and demonstrate a design methodology for domain-optimized computer system architectures. The tangible outcome is a methodology and tools for rapid prototyping and design-space exploration, leading to highly optimized and efficient HPC systems.

  11. Steady squares and hexagons on a subcritical ramp

    International Nuclear Information System (INIS)

    Hoyle, R.B.

    1995-01-01

    Steady squares and hexagons on a subcritical ramp are studied, both analytically and numerically, within the framework of the lowest-order amplitude equations. On the subcritical ramp, the external stress or control parameter varies continuously in space from subcritical to supercritical values. At the subcritical end of the ramp, pattern formation is suppressed, and patterns fade away into the conduction solution. It is shown that three-dimensional patterns may change shape on a subcritical ramp. A square pattern becomes a pattern of rolls as it fades, with the roll axes aligned in the direction orthogonal to that in which the control parameter varies. Hexagons in systems with horizontal midplane symmetry become a pattern of rectangles before reaching the conduction solution. There is a suggestion that hexagons in systems which lack this symmetry might fade away through a roll pattern. Numerical simulations are used to illustrate these phenomena

  12. Rf beam loading in the Brookhaven AGS with booster injection

    International Nuclear Information System (INIS)

    Zhang, S.Y.; Raka, E.; Weng, W.T.

    1992-01-01

    Multi-batch bunched beam loading during injection from the Booster to the AGS will be discussed. The full intensity beam injection to the upgraded AGS rf system with beam phase and radial feedbacks will be studied. It is shown that a beam phase feedback is necessary in order to guarantee a predictable hewn behavior after the first batch injection, otherwise the initial phase deviation for the following batch injections cannot be controlled. However, the effectiveness of the phase feedback control of the transient beam loading may be limited by an emittance blow up in the process. It is shown that a fast power amplifier feedback with a moderate gain can significantly reduce the transient effect of the bunched beam injection

  13. An independent system operator's perspective on operational ramp forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Porter, G. [New Brunswick System Operator, Fredericton, NB (Canada)

    2010-07-01

    One of the principal roles of the power system operator is to select the most economical resources to reliably supply electric system power needs. Operational wind power production forecasts are required by system operators in order to understand the impact of ramp event forecasting on dispatch functions. A centralized dispatch approach can contribute to a more efficient use of resources that traditional economic dispatch methods. Wind ramping events can have a significant impact on system reliability. Power systems can have constrained or robust transmission systems, and may also be islanded or have large connections to neighbouring systems. Power resources can include both flexible and inflexible generation resources. Wind integration tools must be used by system operators to improve communications and connections with wind power plants. Improved wind forecasting techniques are also needed. Sensitivity to forecast errors is dependent on current system conditions. System operators require basic production forecasts, probabilistic forecasts, and event forecasts. Forecasting errors were presented as well as charts outlining the implications of various forecasts. tabs., figs.

  14. Model based controls and the AGS booster controls system architecture

    International Nuclear Information System (INIS)

    Casella, R.A.

    1987-01-01

    For the past three years the Accelerator Controls Section has been responsible for the development of the Heavy Ion Transfer Line (HITL) used to inject heavy ions created at the Tandem Van de Graaff into the Alternating Gradient Synchrotron (AGS). This was recognized as an opportunity to test new ideas for control of a beam line, which if successful, could be implemented in an upgrade of the existing control system for the AGS. The in place control system for the AGS consisted of DEC PDP10 computer as the primary computer interface to the accelerator via three control room consoles, and keeper of the device database. For the HITL project it was decided to make the control system a true distributed network putting more computing power down at the device level via intelligent subsystems. A network of Apollo workstations was added at the host level. Apollos run a distributed operating system and are connected to each other by the Domain Token Ring Network. The Apollos were seen as the new primary computers for consoles with each console containing at least one Apollo. These hosts and all other subsystems are connected to each other via an in house developed LAN (RELWAY). The design of the control system developed for HITL was mostly successful. The proposed AGS Booster is designed to be a synchrotron injector for the AGS. With the forthcoming development of the Booster for the AGS an opportunity has again developed to implement new ideas for accelerator control. One weakness of the HITL control system is the limited cpu power and poor debugging facilities of the stations

  15. Oil Sands Regional Aquatics Monitoring Program (RAMP) 5 year report

    International Nuclear Information System (INIS)

    Fawcett, K.

    2003-05-01

    This 5 year report outlined and examined the activities of the Regional Aquatics Monitoring Program (RAMP) from its introduction in 1997 up to 2001. The RAMP is a multi-stakeholder program comprised of industry and government representatives as well as members of aboriginal groups and environmental organizations. The objectives of RAMP are to monitor aquatic environments in the oil sands region in order to allow for assessment of regional trends and cumulative effects, as well as to provide baseline data against which impact predictions of recent environmental impact assessments can be verified. Scientific programs conducted as part of RAMP during the 5-year period included water quality and sediment quality analyses; fish monitoring; benthic communities monitoring; water quality and aquatic vegetation analyses of wetlands; and hydrology and climate monitoring. RAMP's programs have expanded annually in scope as a result of increased oil sands development in the region. This report provided outlines of RAMP's individual program objectives and organizational structures, as well as details of all studies conducted for each year. Data were collected for all major study areas were presented, and program methodologies for assessing and identifying trends were outlined. refs., tabs., figs

  16. Low Energy Electron Cooler for NICA Booster

    CERN Document Server

    Denisov, A P

    2017-01-01

    BINP has developed an electron cooler to increase the ion accumulation efficiency in the NICA (Nuclotron-based Ion Collider fAcility) heavy ion booster (JINR, Dubna). Adjustment of the cooler magnetic system provides highly homogeneous magnetic field in the cooling section B trans/B long ≤ 4∙10-5 which is vital for efficient electron cooling. First experiments with an electron beam performed at BINP demonstrated the target DC current of 500 mA and electron energy 6 keV.

  17. The superconducting linac booster at the ANU

    International Nuclear Information System (INIS)

    Weisser, D.C.

    1995-02-01

    This report outlines the progress of the installation of the superconducting Linac booster at the Australian National University. The Linac is based upon four modules, three of which contain three split-loop resonators. The fourth cryostat was intended to be a superbuncher and so houses only one resonator. The first stage of Linac operation will employ only three modules with 2 MV/m from each resonator. It is expected that the implementation of all nine modules, in subsequent stages, would boost beams by 18 MV/q. The project has fostered productive international collaboration between UK and Australian scientists. 1 tab., 6 figs

  18. The injection and extraction of SSRF booster

    International Nuclear Information System (INIS)

    Li Yuan; Li Haohu; Liu Guimin; Li Deming

    2008-01-01

    The layout of injection and extraction system were introduced in this paper. The horizontal and vertical injection acceptance are about 23 πmm·mrad and 37 πmm·mrad, respectively, while emittance of the injected beam is 9 πmm·mrad (3σ). This ensures the high injection efficiency. Three slow kickers can form a good bump. The inside position of the entrance of septum is set to 15 mm, where the bumped beam and the extraction beam are 10 mm and 22 mm, respectively, far from the booster central orbit. (authors)

  19. The PS Booster's ejection kicker: full house.

    CERN Multimedia

    CERN PhotoLab

    1971-01-01

    The modules of the Booster's four-storied full-aperture kicker pretty much fill their vacuum tank (front cover removed). In the original 800 MeV version, the delay-type modules were pulsed at 30 kV from a Pulse-Forming-Network (PFN), yielding a field risetime as short as 60 ns. The fieldstrength was 0.1 T at a current of 1200 A. The modules are made from steel plates and ferrite slabs. The ferrite's high initial outgassing rate presented a serious vacuum problem for a long time.

  20. Position pickup of the PS Booster

    CERN Multimedia

    CERN PhotoLab

    1975-01-01

    The beam position around the 4 rings of the PS Booster (originally 800 MeV, now 1.4 GeV), is measured with electrostatic pickups (PU). They consist of a ceramic cylinder forming part of the vacuum chamber, and, in order to save space, they are located inside the multipole lenses. The inside of the ceramic is coated with a metallic layer, into which the form of the electrodes was cut by computer-controlled micro-sandblasting. Each PU has a pair of horizontal and a pair of vertical electrodes, as well as a separate intensity-sensing circular electrode.

  1. The low energy booster project status

    International Nuclear Information System (INIS)

    Tuttle, G.W.

    1993-05-01

    In order to achieve the required injection momentum, the Superconducting Super Collider (SSC) has an accelerator chain comprised of a Linear Accelerator and three synchrotrons. The Low Energy Booster (LEB) is the first synchrotron in this chain. The LEB project has made significant progress in the development of major subsystems and conventional construction. This paper briefly reviews the performance requirements of the LEB and describes significant achievements in each of the major subsystem areas. Highlighted among these achievements are the LEB foreign collaborations with the Budker Institute of Nuclear Physics (BINP) located in Novosibirsk, Russia

  2. Off-ramps and on-ramps: keeping talented women on the road to success.

    Science.gov (United States)

    Hewlett, Sylvia Ann; Luce, Carolyn Buck

    2005-03-01

    Most professional women step off the career fast track at some point. With children to raise, elderly parents to care for, and other pulls on their time, these women are confronted with one off-ramp after another. When they feel pushed at the same time by long hours and unsatisfying work, the decision to leave becomes even easier. But woe to the woman who intends for that exit to be temporary. The on-ramps for professional women to get back on track are few and far between, the authors confirm. Their new survey research reveals for the first time the extent of the problem--what percentage of highly qualified women leave work and for how long, what obstacles they face coming back, and what price they pay for their time-outs. And what are the implications for corporate America? One thing at least seems clear: As market and economic factors align in ways guaranteed to make talent constraints and skill shortages huge issues again, employers must learn to reverse this brain drain. Like it or not, large numbers of highly qualified, committed women need to take time out of the workplace. The trick is to help them maintain connections that will allow them to reenter the workforce without being marginalized for the rest of their lives. Strategies for building such connections include creating reduced-hour jobs, providing flexibility in the workday and in the arc of a career, removing the stigma of taking time off, refusing to burn bridges, offering outlets for altruism, and nurturing women's ambition.

  3. Compensation of dogleg effect in Fermilab Booster

    CERN Document Server

    Xiao Biao Huang

    2003-01-01

    The edge focusing of dogleg magnets in Fermilab Booster has been causing severe distortion to the horizontal linear optics. The doglegs are vertical rectangular bends, therefore the vertical edge focusing is canceled by body focusing and the overall effect is focusing in the horizontal plane. The maximum horizontal beta function is changed from 7m to 46.9m and maximum dispersion from 3.19m to 6.14m. Beam size increases accordingly. This is believed to be one of the major reasons of beam loss. In this technote we demonstrate that this effect can be effectively corrected with Booster's quadrupole correctors in short straight sections (QS). There are 24 QS correctors which can alter horizontal linear optics with negligible perturbation to the vertical plane. The currents of correctors are determined by harmonic compensation, i.e., cancellation of dogleg's harmonics that are responsible for the distortion with that of QS correctors. By considering a few leading harmonics, the ideal lattice can be partly restored....

  4. Identifying strategies to improve the effectiveness of booster seat laws

    Science.gov (United States)

    2008-05-01

    The objective of this project was to identify strategies to improve the effectiveness of booster seat laws. The project explored the possible factors that relate to the use and nonuse of booster seats, and examined the attitudes of law enforcement of...

  5. Thermodynamic investigation of a booster-assisted ejector refrigeration system

    International Nuclear Information System (INIS)

    Zhao, Hongxia; Zhang, Ke; Wang, Lei; Han, Jitian

    2016-01-01

    Highlights: • COP based on thermal input increases with booster outlet pressure. • Both entrainment ratio and area ratio increase with booster outlet pressure. • COP based on work is larger than compressor-based refrigeration system. • An optimum booster outlet pressure obtains maximum COP based on work. • Exergy destruction occurs mainly in ejector, condenser, evaporator and generator. - Abstract: In order to improve performance of ejector refrigeration system, a booster is added before an ejector to enhance secondary flow pressure, which is called a booster assisted refrigeration system. Based on mass, momentum and energy conservation, a 1D model of ejector for optimal performance prediction was presented and validated with experimental data. A detailed study of working characteristics of the booster assisted ejector refrigeration system was carried out and compared against conventional ejector refrigeration system and compressor based refrigeration system, on the basis of first and second laws of thermodynamics. Effects of booster outlet pressure on COP_t_h based on thermal energy and COP_w based on work input, and also on entrainment ratio and area ratio of ejector were studied. The exergy destruction rates were also computed and analyzed for components of the booster-assisted ejector refrigeration system. Ways to reduce exergy destruction were discussed.

  6. Measuring modulated luminescence using non-modulated stimulation: Ramping the sample period

    DEFF Research Database (Denmark)

    Poolton, N.R.J.; Bøtter-Jensen, L.; Andersen, C.E.

    2003-01-01

    . Directly analogous results to LM-OSL can, however, be achieved with non-modulated excitation sources, by ramping the sample period (RSP) of luminescence detection. RSP-OSL has the distinct advantage over LM-OSL in that, since the excitation remains at full power, data accumulation times (that can...... be considerable) can be reduced by typically 50%. RSP methods are universally applicable and can be employed, for example, where the excitation source is constant heat, rather than light: here, iso-thermal decay of phosphorescence becomes recorded as a sequence of peaks, corresponding to de-trapping of charge...

  7. An overview of Booster and AGS Polarized Proton Operations during Run 17

    Energy Technology Data Exchange (ETDEWEB)

    Zeno, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-10-11

    There were only a few differences in the setup between this year’s Polarized Proton run and the previous one (Run 15). Consequently, this note will focus on these differences as well as a few more notable studies done during the course of the run. This year, the Booster input intensity was kept around 7e11 for the majority of the run whereas in Run 15 it was kept around 9e11. It was lowered because there was some indication that the source polarization was higher with this lower input. Some of the polarization measurements that motivated this change will be discussed. Both the emittance and polarization on the AGS flattop show intensity dependence, thought to be related to the peak current, especially early in the AGS acceleration ramp. In Run 15, the AGS Rf was configured for h=8, but in this run h=6 was used to reduce the peak current and also to allow for the possibility of using a dual harmonic to reduce it further. Eventually, a dual harmonic configuration was used for the first 100 ms or so of the AGS acceleration cycle. Two cavities were set to h=12 and phased differently than the other 8 to accomplish this. Quad pumping was also used at Booster extraction to make the bunch injected into the AGS wider in order to match the dual harmonic bucket right at injection. This configuration, which was used for the majority of the run, will be described. Measurements of the intensity dependence of the transverse emittance and polarization with and without it will be compared.

  8. Superconducting racetrack booster for the ion complex of MEIC

    Energy Technology Data Exchange (ETDEWEB)

    Filatov, Yu [Joint Inst. for Nuclear Research (JINR), Dubna (Russian Federation); Moscow Inst. of Physics and Technology (MIPT), Moscow (Russian Federation); Kondratenko, A. M. [Science and Technique Laboratory ' Zaryad' , 630090, Novosibirsk, Russia; Kondratenko, M. A. [Science and Technique Laboratory ' Zaryad' , 630090, Novosibirsk, Russia; Kovalenko, A. [Joint Inst. for Nuclear Research (JINR), Dubna (Russian Federation); Derbenev, Yaroslav S. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Lin, Fanglei [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Morozov, Vasiliy S. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Zhang, Yuhong [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2016-02-01

    The current design of the Medium-energy Electron-Ion Collider (MEIC) project at Jefferson lab features a single 8 GeV/c figure-8 booster based on super-ferric magnets. Reducing the circumference of the booster by switching to a racetrack design may improve its performance by limiting the space charge effect and lower its cost. We consider problems of preserving proton and deuteron polarizations in a superconducting racetrack booster. We show that using magnets based on hollow high-current NbTi composite superconducting cable similar to those designed at JINR for the Nuclotron guarantees preservation of the ion polarization in a racetrack booster up to 8 GeV/c. The booster operation cycle would be a few seconds that would improve the operating efficiency of the MEIC ion complex.

  9. New Product Fumbles - Organizing for the Ramp-up Process

    DEFF Research Database (Denmark)

    Christensen, Irene

    This study examines rapid prototyping, also referred to as new production launch, or ramp-up time. A strong emphasis on speed is vital for the success of a product development and market launch. Managers concern themselves with organizing ramp-up activities into arrayed sequences to achieve...... production launch goals. These sequences are not only regarding prearranged linear milestones, but extensively reviewed and often reorganized complex activities, with the managerial goal of a wellconfigured productive process. The need to manage the final phase in product development is evident, because many...... of the development of products. This has been achieved by longitudinally studying a total of eight major development cases at a large Scandinavian manufacturing company over a period of three years. These development projects faced different challenges during the interface between R&D and ramp-up production...

  10. X-36 on Ramp Viewed from Above

    Science.gov (United States)

    1997-01-01

    This look-down view of the X-36 Tailless Fighter Agility Research Aircraft on the ramp at NASA's Dryden Flight Research Center, Edwards, California, clearly shows the unusual wing and canard design of the remotely-piloted aircraft. The NASA/Boeing X-36 Tailless Fighter Agility Research Aircraft program successfully demonstrated the tailless fighter design using advanced technologies to improve the maneuverability and survivability of possible future fighter aircraft. The program met or exceeded all project goals. For 31 flights during 1997 at the Dryden Flight Research Center, Edwards, California, the project team examined the aircraft's agility at low speed / high angles of attack and at high speed / low angles of attack. The aircraft's speed envelope reached up to 206 knots (234 mph). This aircraft was very stable and maneuverable. It handled very well. The X-36 vehicle was designed to fly without the traditional tail surfaces common on most aircraft. Instead, a canard forward of the wing was used as well as split ailerons and an advanced thrust-vectoring nozzle for directional control. The X-36 was unstable in both pitch and yaw axes, so an advanced, single-channel digital fly-by-wire control system (developed with some commercially available components) was put in place to stabilize the aircraft. Using a video camera mounted in the nose of the aircraft and an onboard microphone, the X-36 was remotely controlled by a pilot in a ground station virtual cockpit. A standard fighter-type head-up display (HUD) and a moving-map representation of the vehicle's position within the range in which it flew provided excellent situational awareness for the pilot. This pilot-in-the-loop approach eliminated the need for expensive and complex autonomous flight control systems and the risks associated with their inability to deal with unknown or unforeseen phenomena in flight. Fully fueled the X-36 prototype weighed approximately 1,250 pounds. It was 19 feet long and three feet

  11. Effect of ramp-cavity on hydrogen fueled scramjet combustor

    Directory of Open Access Journals (Sweden)

    J.V.S. Moorthy

    2014-03-01

    Full Text Available Sustained combustion and optimization of combustor are the two challenges being faced by combustion scientists working in the area of supersonic combustion. Thorough mixing, lower stagnation pressure losses, positive thrust and sustained combustion are the key issues in the field of supersonic combustion. Special fluid mechanism is required to achieve good mixing. To induce such mechanisms in supersonic inflows, the fuel injectors should be critically shaped incurring less flow losses. Present investigations are focused on the effect of fuel injection scheme on a model scramjet combustor performance. Ramps at supersonic flow generate axial vortices that help in macro-mixing of fuel with air. Interaction of shocks generated by ramps with the fuel stream generates boro-clinic torque at the air & liquid fuel interface, enhancing micro-mixing. Recirculation zones present in cavities increase the residence time of the combustible mixture. Making use of the advantageous features of both, a ramp-cavity combustor is designed. The combustor has two sections. First, constant height section consists of a backward facing step followed by ramps and cavities on both the top and bottom walls. The ramps are located alternately on top and bottom walls. The complete combustor width is utilized for the cavities. The second section of the combustor is diverging area section. This is provided to avoid thermal choking. In the present work gaseous hydrogen is considered as fuel. This study was mainly focused on the mixing characteristics of four different fuel injection locations. It was found that injecting fuel upstream of the ramp was beneficial from fuel spread point of view.

  12. H-mode access during plasma current ramp-up in TCV

    International Nuclear Information System (INIS)

    Martin, Y.; Behn, R.; Furno, I.; Labit, B.; Reimerdes, H.

    2014-01-01

    A recent TCV experiment has investigated the dependence of the L–H transition threshold power on the plasma current ramp-rate and the X-point height above the divertor target, which both have previously been seen to affect the transition behaviour. Systematic scans in ohmically heated plasmas do not show any dependence on the plasma current ramp-up rate. In contrast, the threshold power is found to increase by a factor of two while the X-point is moved from about 10 cm up to 35 cm above the vessel floor. However, further increase, up to 60 cm, does not lead to any further increase of the required power. The Fundamenski et al model is tested against the measurements. Estimates of the Wagner number (Wa) at L–H transitions are generally close to unity, in accordance with the model. In contrast, estimates of Wa before the L–H transition, i.e. in L-mode, do not show the expected evolution towards unity. (paper)

  13. Analysis of failed ramps during the RHIC FY09 run

    Energy Technology Data Exchange (ETDEWEB)

    Minty, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2014-08-15

    The Relativistic Heavy Ion Collider (RHIC) is a versatile accelerator that supports operation with polarized protons of up to 250 GeV and ions with up to 100 GeV/nucleon. During any running period, various operating scenarios with different particle species, beam energies or accelerator optics are commissioned. In this report the beam commissioning periods for establishing full energy beams (ramp development periods) from the FY09 run are summarized and, for the purpose of motivating further developments, we analyze the reasons for all failed ramps.

  14. Analysis of failed ramps during the RHIC FY09 run

    International Nuclear Information System (INIS)

    Minty, M.

    2014-01-01

    The Relativistic Heavy Ion Collider (RHIC) is a versatile accelerator that supports operation with polarized protons of up to 250 GeV and ions with up to 100 GeV/nucleon. During any running period, various operating scenarios with different particle species, beam energies or accelerator optics are commissioned. In this report the beam commissioning periods for establishing full energy beams (ramp development periods) from the FY09 run are summarized and, for the purpose of motivating further developments, we analyze the reasons for all failed ramps.

  15. Calculations of Fission Gas Release During Ramp Tests Using Copernic Code

    Energy Technology Data Exchange (ETDEWEB)

    Tong, Liu [Nuclear Fuel R and D Center, China Nuclear Power Technology Research Institute (CNPRI) (China)

    2013-03-15

    The report performed under IAEA research contract No.15951 describes the results of fuel performance evaluation of LWR fuel rods operated at ramp conditions using the COPERNIC code developed by AREVA. The experimental data from the Third Riso Fission Gas Project and the Studsvik SUPER-RAMP Project presented in the IFPE database of the OECD/NEA has been utilized for assessing the code itself during simulation of fission gas release (FGR). Standard code models for LWR fuel were used in simulations with parameters set properly in accordance with relevant test reports. With the help of data adjustment, the input power histories are restructured to fit the real ones, so as to ensure the validity of FGR prediction. The results obtained by COPERNIC show that different models lead to diverse predictions and discrepancies. By comparison, the COPERNIC V2.2 model (95% Upper bound) is selected as the standard FGR model in this report and the FGR phenomenon is properly simulated by the code. To interpret the large discrepancies of some certain PK rods, the burst effect of FGR which is taken into consideration in COPERNIC is described and the influence of the input power histories is extrapolated. In addition, the real-time tracking capability of COPERNIC is tested against experimental data. In the process of investigation, two main dominant factors influencing the measured gas release rate are described and different mechanisms are analyzed. With the limited predicting capacity, accurate predictions cannot be carried out on abrupt changes of FGR during ramp tests by COPERNIC and improvements may be necessary to some relevant models. (author)

  16. Vacuum chamber eddy current correction coil for the AGS Booster

    International Nuclear Information System (INIS)

    Danby, G.; Jackson, J.

    1988-01-01

    The AGS Booster injector will perform a variety of functions. Heavy ion acceleration requires a bakeable, ultra-high vacuum system (VC). Acceleration for intense proton beams requires rapid cycling (B /preceq/ 10T/sec). If straight forward heavy walled VC are used, the field perturbations due to eddy currents are large. The state of the art lattice has highly distributed lumped sextupoles capable of substantially correcting the induced field nonlinearity. Nevertheless, for the very highest space charge-intensity limits, it is desirable to have the capability to remove eddy current fields at the source. Correction coils attached to the outside of the VC cancel its current aberrations over the required good field aperture. These can be passively powered by transformer action, using two turn windings around the magnet yoke. Programmed power supplies can also be used. This inexpensive additional correction option uses a three turn per quadrant coil which follows the local contour of the VC. Transverse movements of several mms of the VC will have no beam optical effect since the large field aberrations and their corrections have the same displaced coordinates. Experimental and computer studies will be presented, as well as mechanical and electrical design of a simple method of construction. 6 figs

  17. Beam tests on a proton linac booster for hadron therapy

    CERN Document Server

    De Martinis, C; Berra, P; Birattari, C; Calabretta, L; Crandall, K; Giove, D; Masullo, M R; Mauri, M; Rosso, E; Rovelli, A; Serafini, L; Szeless, Balázs; Toet, D Z; Vaccaro, Vittorio G; Weiss, M; Zennaro, R

    2002-01-01

    LIBO is a 3 GHz modular side-coupled proton linac booster designed to deliver beam energies up to 200 MeV, as required for the therapy of deep seated tumours. The injected beam of 50 to 70 MeV is produced by a cyclotron like those in several hospitals and research institutes. A full-scale prototype of the first module with an input/output energy of 62/74 MeV, respectively, was designed and built in 1999 and 2000. Full power RF tests were carried out successfully at CERN using a test facility at LIL at the end of the year 2000. In order to prove the feasibility of the acceleration process, an experimental setup with this module was installed at the INFN Laboratorio Nazionale del Sud (LNS) in Catania during 2001. The superconducting cyclotron provided the 62 MeV test beam. A compact solid-state RF modulator with a 4 MW klystron, made available by IBA-Scanditronix, was put into operation to power the linac. In this paper the main features of the accelerator are reviewed and the experimental results obtained duri...

  18. Vacuum chamber eddy current correction coil for the AGS booster

    International Nuclear Information System (INIS)

    Danby, G.; Jackson, J.

    1988-01-01

    This paper reports on the AGS Booster injector that performs a variety of functions. Heavy ion acceleration requires a bakeable, ultra-high vacuum system (VC). Acceleration for intense proton beams requires rapid cycling (B ≤10T/sec). If straight forward heavy walled VC are used, the field perturbations due to eddy currents are large. The state of the art lattice has highly distributed lumped sextupoles capable of substantially correcting the induced field nonlinearity. Nevertheless, for the very highest space charge-intensity limits, it is desirable to have the capability to remove eddy current fields at the source. Correction coils attached to the outside of the VC cancel its current aberrations over the required good field aperture. These can be passively powered by transformer action, using two turn windings around the magnet yoke. Programmed power supplies can also be used. This inexpensive additional correction option uses a three turn per quadrant coil which follows the local contour of the VC. Transverse movements of several mms of the VC will have no beam optical effect since the large field aberrations and their corrections have the same displace coordinates. Experimental and computer studies will be presented, as well as mechanical and electrical design of a simple method of construction

  19. Superconducting linac booster for NSC Pelletron

    International Nuclear Information System (INIS)

    Roy, A.; Prakash, P.N.; Ajithkumar, B.P.; Ghosh, S.; Changrani, T.; Mehta, R.; Sarkar, A.; Muralidhar, S.; Dutt, R.N.; Kumar, M.; Shepard, K.W.; and others.

    1996-01-01

    The progress made in the heavy ion superconducting linac booster project for the Nuclear Science Centre Pelletron accelerator is overviewed. Prototypes of the accelerating structure have been fabricated at Argonne National Laboratory and undergone several diagnostic tests. In the first phase heavy ions up to mass 80 will be accelerated to energies above the Coulomb barrier and in the second phase the mass limit would be increased to 120. The subsystems of the project are the basic accelerating structures, the RF instrumentation and control, the cryogenic system and the beam optics. Preliminary designs for the buncher and linac cryostats have been made. Several prototypes of RF electronics and control modules have been fabricated and tested. (R.P.)

  20. Pulsed neutron source very intense, Booster

    International Nuclear Information System (INIS)

    Abbate, J.M.

    1978-09-01

    A compact Accelerator-Booster (fast, pulsed and modulate reactivity research reactor) is a new and appropriate conception to use as a very intense thermal neutrons source. Its definition and feasibility have been already described in several studies showing its relative advantages in comparison with others kinds of facilities. This work, wich is part of one of those studies, contains a general analysis on the meis facility parameters and core and shielding theoretical calculations. The following results were obtained: Selection and test of a calculation system suitable to use in compact fast reactors; Development a method to perform estimations in some safety and shielding problems and obtainment of adequate theoretical predictions on the general performance. Moreover, final results for importent parameters of the feasibility study and predesign (critical mass and volume, lifetime, etc.) and others related to the use of plutonium oxide as fuel are given and then evaluations of different basic functions are showed. (author) [es

  1. Autonomous booster device of a safety valve

    International Nuclear Information System (INIS)

    Namand, H.

    1983-01-01

    The invention concerns an autonomous booster device of a protection safety valve of a pressure vessel. The valve comprises a hollow structure, a seat connected with a mobile flap forming one piece with a stem and a calibration spring bearing on the stem and on the valve structure to maintain the flap bearing on the seat. The stem of the flap is prolongated in a box forming one piece with the valve structure and receives an added push of a spring. The box acts as a pressure device of which the piston can exercise on the stem a push opposite to and larger than the spring one. The feeding device of the pressure box is finally described in detail [fr

  2. The AGS Booster beam loss monitor system

    International Nuclear Information System (INIS)

    Beadle, E.R.; Bennett, G.W.; Witkover, R.L.

    1991-01-01

    A beam loss monitor system has been developed for the Brookhaven National Laboratory Booster accelerator, and is designed for use with intensities of up to 1.5 x 10 13 protons and carbon to gold ions at 50-3 x 10 9 ions per pulse. This system is a significant advance over the present AGS system by improving the sensitivity, dynamic range, and data acquisition. In addition to the large dynamic range achievable, it is adaptively shifted when high losses are detected. The system uses up to 80 argon filled ion chambers as detectors, as well as newly designed electronics for processing and digitizing detector outputs. The hardware simultaneously integrates each detector output, interfaces to the beam interrupt systems, and digitizes all 80 channels to 21 bits at 170 KHz. This paper discuses the design, construction, and operation of the system. 4 refs., 2 figs

  3. Technology for low cost solid rocket boosters.

    Science.gov (United States)

    Ciepluch, C.

    1971-01-01

    A review of low cost large solid rocket motors developed at the Lewis Research Center is given. An estimate is made of the total cost reduction obtainable by incorporating this new technology package into the rocket motor design. The propellant, case material, insulation, nozzle ablatives, and thrust vector control are discussed. The effect of the new technology on motor cost is calculated for a typical expandable 260-in. booster application. Included in the cost analysis is the influence of motor performance variations due to specific impulse and weight changes. It is found for this application that motor costs may be reduced by up to 30% and that the economic attractiveness of future large solid rocket motors will be improved when the new technology is implemented.

  4. Booster Vaccination: The Role of Reduced Antigen Content Vaccines as a Preschool Booster

    Directory of Open Access Journals (Sweden)

    Giovanni Gabutti

    2014-01-01

    Full Text Available The need for boosters for tetanus, diphtheria, pertussis, and polio, starting from preschool age, is related to the waning immune protection conferred by vaccination, the elimination/reduction of natural boosters due to large-scale immunization programs, and the possibility of reintroduction of wild agents from endemic areas. Taking into account the relevance of safety/tolerability in the compliance with vaccination among the population, it have been assessed whether today enough scientific evidences are available to support the use of dTap-IPV booster in preschool age. The review of the literature was conducted using the PubMed search engine. A total of 41 works has been selected; besides, the documentation produced by the World Health Organization, the European Centre for Disease Control, and the Italian Ministry of Health has been consulted. Many recent papers confirm the opportunity to use a low antigenic dose vaccine starting from 4 to 6 years of age. There is also evidence that 10 years after immunization the rate of seroprotected subjects against diphtheria does not differ significantly between those vaccinated with paediatric dose (DTaP or reduced dose (dTaP or dTap product. The dTpa vaccine is highly immunogenic for diphtheria toxoids regardless of prior vaccination history (2 + 1 and 3 + 1 schedules.

  5. Rf beam control for the AGS Booster

    International Nuclear Information System (INIS)

    Brennan, J.M.

    1994-01-01

    RF beam control systems for hadron synchrotrons have evolved over the past three decades into an essentially standard design. The key difference between hadron and lepton machines is the absence of radiation damping and existence of significant frequency variation in the case of hadrons. Although the motion of the hadron in the potential well of the rf wave is inherently stable it is not strongly damped. Damping must be provided by electronic feedback through the accelerating system. This feedback is typically called the phase loop. The technology of the rf beam control system for the AGS Booster synchrotron is described. First, the overall philosophy of the design is explained in terms of a conventional servo system that regulates the beam horizontal position in the vacuum chamber. The concept of beam transfer functions is fundamental to the mathematics of the design process and is reviewed. The beam transfer functions required for this design are derived from first principles. An overview of the beam signal pick-ups and high level rf equipment is given. The major subsystems, the frequency program, the heterodyne system, and beam feedback loops, are described in detail. Beyond accelerating the beam, the rf system must also synchronize the bunches in the Booster to the buckets in the AGS before transfer. The technical challenge in this process is heightened by the need to accomplish synchronization while the frequency is still changing. Details of the synchronization system are given. This report is intended to serve two purposes. One is to document the hardware and performance of the systems that have been built. The other is to serve as a tutorial vehicle from which the non-expert can not only learn the details of this system but also learn the principles of beam control that have led to the particular design choices made

  6. Boosters and barriers for direct cardiac reprogramming.

    Science.gov (United States)

    Talkhabi, Mahmood; Zonooz, Elmira Rezaei; Baharvand, Hossein

    2017-06-01

    Heart disease is currently the most significant cause of morbidity and mortality worldwide, which accounts for approximately 33% of all deaths. Recently, a promising and alchemy-like strategy has been developed called direct cardiac reprogramming, which directly converts somatic cells such as fibroblasts to cardiac lineage cells such as cardiomyocytes (CMs), termed induced CMs or iCMs. The first in vitro cardiac reprogramming study, mediated by cardiac transcription factors (TFs)-Gata4, Tbx5 and Mef2C-, was not enough efficient to produce an adequate number of fully reprogrammed, functional iCMs. As a result, numerous combinations of cardiac TFs exist for direct cardiac reprogramming of mouse and human fibroblasts. However, the efficiency of direct cardiac reprogramming remains low. Recently, a number of cellular and molecular mechanisms have been identified to increase the efficiency of direct cardiac reprogramming and the quality of iCMs. For example, microgrooved substrate, cardiogenic growth factors [VEGF, FGF, BMP4 and Activin A], and an appropriate stoichiometry of TFs boost the direct cardiac reprogramming. On the other hand, serum, TGFβ signaling, activators of epithelial to mesenchymal transition, and some epigenetic factors (Bmi1 and Ezh2) are barriers for direct cardiac reprogramming. Manipulating these mechanisms by the application of boosters and removing barriers can increase the efficiency of direct cardiac reprogramming and possibly make iCMs reliable for cell-based therapy or other potential applications. In this review, we summarize the latest trends in cardiac TF- or miRNA-based direct cardiac reprogramming and comprehensively discuses all molecular and cellular boosters and barriers affecting direct cardiac reprogramming. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Rf beam control for the AGS Booster

    Energy Technology Data Exchange (ETDEWEB)

    Brennan, J.M.

    1994-09-26

    RF beam control systems for hadron synchrotrons have evolved over the past three decades into an essentially standard design. The key difference between hadron and lepton machines is the absence of radiation damping and existence of significant frequency variation in the case of hadrons. Although the motion of the hadron in the potential well of the rf wave is inherently stable it is not strongly damped. Damping must be provided by electronic feedback through the accelerating system. This feedback is typically called the phase loop. The technology of the rf beam control system for the AGS Booster synchrotron is described. First, the overall philosophy of the design is explained in terms of a conventional servo system that regulates the beam horizontal position in the vacuum chamber. The concept of beam transfer functions is fundamental to the mathematics of the design process and is reviewed. The beam transfer functions required for this design are derived from first principles. An overview of the beam signal pick-ups and high level rf equipment is given. The major subsystems, the frequency program, the heterodyne system, and beam feedback loops, are described in detail. Beyond accelerating the beam, the rf system must also synchronize the bunches in the Booster to the buckets in the AGS before transfer. The technical challenge in this process is heightened by the need to accomplish synchronization while the frequency is still changing. Details of the synchronization system are given. This report is intended to serve two purposes. One is to document the hardware and performance of the systems that have been built. The other is to serve as a tutorial vehicle from which the non-expert can not only learn the details of this system but also learn the principles of beam control that have led to the particular design choices made.

  8. Effect of Ramping Requirement and Price Cap on Energy Price in a System with High Wind Penetration

    OpenAIRE

    Martin, Sebastián; Smeers, Yves; Aguado-Sanchez, Jose Antonio

    2015-01-01

    The European power market is currently retiring or mothballing large capacities of conventional plants, and at the same time incorporating a significant amount of non-dispatchable renewable generation, in particular wind. We analyse the mothballing process (and the resulting system) and study how they are affected by a price cap implemented in the energy only market, and by a possible implementation of ramping products in the system. Sebastian Martin, Yves Smeers, and Jose Aguado. Effect o...

  9. Ramp Technology and Intelligent Processing in Small Manufacturing

    Science.gov (United States)

    Rentz, Richard E.

    1992-01-01

    To address the issues of excessive inventories and increasing procurement lead times, the Navy is actively pursuing flexible computer integrated manufacturing (FCIM) technologies, integrated by communication networks to respond rapidly to its requirements for parts. The Rapid Acquisition of Manufactured Parts (RAMP) program, initiated in 1986, is an integral part of this effort. The RAMP program's goal is to reduce the current average production lead times experienced by the Navy's inventory control points by a factor of 90 percent. The manufacturing engineering component of the RAMP architecture utilizes an intelligent processing technology built around a knowledge-based shell provided by ICAD, Inc. Rules and data bases in the software simulate an expert manufacturing planner's knowledge of shop processes and equipment. This expert system can use Product Data Exchange using STEP (PDES) data to determine what features the required part has, what material is required to manufacture it, what machines and tools are needed, and how the part should be held (fixtured) for machining, among other factors. The program's rule base then indicates, for example, how to make each feature, in what order to make it, and to which machines on the shop floor the part should be routed for processing. This information becomes part of the shop work order. The process planning function under RAMP greatly reduces the time and effort required to complete a process plan. Since the PDES file that drives the intelligent processing is 100 percent complete and accurate to start with, the potential for costly errors is greatly diminished.

  10. Ramp-up of CHI Initiated Plasmas on NSTX

    International Nuclear Information System (INIS)

    Mueller, D.; Bell, M.G.; Bell, R.E.; LeBlanc, B.; Roquemore, A.L.; Raman, R.; Jarboe, T.R.; Nelson, B.A.; Soukhanovskii, V.

    2009-01-01

    Experiments on the National Spherical Torus (NSTX) have now demonstrated flux savings using transient coaxial helicity injection (CHI). In these discharges, the discharges initiated by CHI are ramped up with an inductive transformer and exhibit higher plasma current than discharges without the benefit of CHI initiation.

  11. Experiencing Production Ramp-Up Education for Engineers

    Science.gov (United States)

    Bassetto, S.; Fiegenwald, V.; Cholez, C.; Mangione, F.

    2011-01-01

    This paper presents a game of industrialisation, based on a paper airplane, that mimics real world production ramp-up and blends classical engineering courses together. It is based on a low cost product so that it can be mass produced. The game targets graduate students and practitioners in engineering fields. For students, it offers an experiment…

  12. On Reynolds number dependence of micro-ramp-induced transition

    NARCIS (Netherlands)

    Ye, Q.; Schrijer, F.F.J.; Scarano, F.

    2018-01-01

    The variation of transitional flow features past a micro-ramp is investigated when the Reynolds number is decreased approaching the critical regime. Experiments are conducted in the incompressible flow spanning from supercritical to subcritical roughness-height-based Reynolds number ( , 730, 460

  13. Ion-beam etching of ramps in thin film heterostructures

    International Nuclear Information System (INIS)

    Mozhaev, P. B.; Mozhaeva, Ju. E.; Komissinskii, P. V.

    2002-01-01

    Ion-beam patterning of thin films and heterostructures is one of the most common processes of fabrication of thin film devices and structures. 'Directed' nature of ion-beam etching provides a possibility to form certain profiles on the films surface, like shallow ramps, when etching is performed at some inclination angle. A simple geometrical model is presented, describing the formation of a ramp as a shadow of the mask on the film surface. Good agreement with the experiment can be obtained if the mask etching is taken into account. The etching at the opposite direction ('high-angle etching') also can be satisfactory described by the model. The profile of the slope - positive or negative curvature, pits near the end of the ramp - is discussed as a function of the etch rate dependence on the incidence angle. Such etch rate dependences for some often used materials were measured. An area of instability of the resulting ramp shape is found for the 'high-angle etching'. The model is compared with the experimental data reported by other groups. Finally ion-beam etching of a rotating sample at non-normal incidence is discussed, the results are compared with experimental data. (Authors)

  14. Inter-Organisational Coordination in Ramp-Up Execution

    DEFF Research Database (Denmark)

    Christensen, Irene; Karlsson, Christer

    the degree of fragmentation in the process planning and execution. Resource dependence theory (RDT) is used as central explanatory framework for inter-organisational interdependencies formation throughout the planning and execution of the ramp-up activities and milestones. This study aims at exploring inter...

  15. Developing an area-wide system for coordinated ramp meter control.

    Science.gov (United States)

    2008-12-01

    Ramp metering has been broadly accepted and deployed as an effective countermeasure : against both recurrent and non-recurrent congestion on freeways. However, many current ramp : metering algorithms tend to improve only freeway travels using local d...

  16. Logic and control module for the Fermilab booster beam damper

    International Nuclear Information System (INIS)

    Sandberg, B.R.

    1977-01-01

    A logic and control module is included in the electronic system of the booster superdamper. This module produces a 9-bit digital word that controls the delay of beam bunch position information in the Fermilab booster synchrotron so that it arrives at the damping electrodes at the same time as the bunch of beam to be corrected. This delay word generator also has an output feature that only allows delay time decreases as the booster synchrotron frequency program increases monotonically. Such a feature guards against low-index incidental FM from affecting the delay computations

  17. 47 CFR 74.1233 - Processing FM translator and booster station applications.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Processing FM translator and booster station... SERVICES FM Broadcast Translator Stations and FM Broadcast Booster Stations § 74.1233 Processing FM translator and booster station applications. (a) Applications for FM translator and booster stations are...

  18. Break up of bound-N-spatial-soliton in a ramp waveguide

    NARCIS (Netherlands)

    Suryanto, A.; van Groesen, Embrecht W.C.

    2002-01-01

    We present an analytical and numerical investigation of the propagation of spatial solitons in a nonlinear waveguide with ramp linear refractive index profile (ramp waveguide). For the propagation of a single soliton beam in a ramp waveguide, the particle theory shows that the soliton beam follows a

  19. Effects of micro-ramps on a shock wave/turbulent boundary layer interaction

    NARCIS (Netherlands)

    Blinde, P.L.; Humble, R.A.; Van Oudheusden, B.W.; Scarano, F.

    2009-01-01

    Stereoscopic particle image velocimetry is used to investigate the effects of micro-ramp sub-boundary layer vortex generators, on an incident shock wave/boundary layer interaction at Mach 1.84. Single- and double-row arrangements of micro-ramps are considered. The micro-ramps have a height of 20% of

  20. Design and operation of AFC ramp plates for track clearance on longwall faces

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, I R

    1975-10-01

    A study of the use of AFC ramp plates carried out in the University of Newcastle upon Tyne is reported. A 1/4-scale ramp plate test rig was designed and the effects of pushing force, ramp plate toe angle, track width and other factors were studied.

  1. Third Expert Consultation on RAMP (RAMP III) (Helsinki, Finland, September 13, 15 and 20, 1986). Final Report.

    Science.gov (United States)

    United Nations Educational, Scientific and Cultural Organization, Paris (France). General Information Programme.

    Organized for the United Nations Educational, Scientific, and Cultural Organization (Unesco) by contract with the International Council on Archives (ICA), this meeting concerning the Records and Archives Management Programme (RAMP) was attended by 14 experts invited from Unesco member countries. Following a brief introduction, summaries are…

  2. Numerical model for thermoeconomic diagnosis in commercial transcritical/subcritical booster refrigeration systems

    International Nuclear Information System (INIS)

    Ommen, Torben; Elmegaard, Brian

    2012-01-01

    Highlights: ► A transcritical booster refrigeration plant is modelled. ► We examine changes in cost flow at different operation parameters. ► The use of characteristic curves for diagnosis is studied. - Abstract: Transcritical/subcritical booster refrigeration systems are increasingly installed and used in Danish supermarkets. The systems operate in both transcritical and subcritical conditions dependent on the heat rejection performance and the ambient conditions. The plant consists of one refrigerant cycle supplying refrigerant for evaporators in both chilled and frozen display cases. In the paper, thermoeconomic theory is used to establish the cost of cooling at each individual temperature level based on operating costs. With a high amount of operating systems, faulty operation becomes an economic, and environmental, interest. A general solution for evaluation of these systems is considered, with the objective to reduce cost and power consumption of malfunctioning equipment in operation. An analysis of the use of thermoeconomic diagnosis methods is required, as these methods may prove applicable. To accommodate the analysis, a numerical model of a transcritical booster refrigeration plant is considered in this paper. Additionally the characteristic curves method is applied to the high pressure compressor unit of the refrigeration plant. The approach successfully determine whether an anomaly is intrinsic or induced in the component when no uncertainties are introduced in the steady state model.

  3. Object-oriented programming techniques for the AGS Booster

    International Nuclear Information System (INIS)

    Skelly, J.F.

    1991-01-01

    The applications software developed for the control system of the AGS Booster Project was written in the object-oriented language, C++. A the start of the Booster Project, the programming staff of the AGS Controls Section comprised some dozen programmer/analysts, all highly fluent in C but novices in C++. During the coarse of this project, nearly the entire staff converted to using C++ for a large fraction of their assignments. Over 100 C++ software modules are now available for Booster and general AGS use, of which a large fraction are broadly applicable tools. The transition from C to C++ from a managerial perspective is discussed and an overview is provided of the ways in which object classes have been applied in Booster software development

  4. Object-oriented programming techniques for the AGS Booster

    International Nuclear Information System (INIS)

    Skelly, J.F.

    1992-01-01

    The applications software developed for the control system of the AGS Booster Project was written in the object-oriented language, C++. At the start of the Booster Project, the programming staff of the AGS Controls Section comprised some dozen programmer/analysts, all highly fluent in C but novices in C++. During the course of this project, nearly the entire staff converted to using C++ for a large fraction of their assignments. Over 100 C++ software modules are now available both for Booster and general AGS use, of which a large fraction are broadly applicable tools. The transition from C to C++ from a managerial perspective is discussed and an overview is provided of the ways in which object classes have been applied in Booster software development. (author)

  5. Superconducting LINAC booster for the pelletron accelerator at Bombay

    International Nuclear Information System (INIS)

    Pillay, R.G.; Kurup, M.B.; Jain, A.K.; Biswas, D.; Kori, S.A.; Srinivasan, B.

    1989-01-01

    A superconducting heavy ion linear accelerator being constructed as a booster for the 14 UD pelletron installed recently at Bombay. The work involved in this project and the progress made so far are reviewed. (author). 15 refs., 8 figs

  6. SIMULATIONS OF BOOSTER INJECTION EFFICIENCY FOR THE APS-UPGRADE

    Energy Technology Data Exchange (ETDEWEB)

    Calvey, J.; Borland, M.; Harkay, K.; Lindberg, R.; Yao, C.-Y.

    2017-06-25

    The APS-Upgrade will require the injector chain to provide high single bunch charge for swap-out injection. One possible limiting factor to achieving this is an observed reduction of injection efficiency into the booster synchrotron at high charge. We have simulated booster injection using the particle tracking code elegant, including a model for the booster impedance and beam loading in the RF cavities. The simulations point to two possible causes for reduced efficiency: energy oscillations leading to losses at high dispersion locations, and a vertical beam size blowup caused by ions in the Particle Accumulator Ring. We also show that the efficiency is much higher in an alternate booster lattice with smaller vertical beta function and zero dispersion in the straight sections.

  7. Design and status of the AGS booster accelerator

    International Nuclear Information System (INIS)

    Forsyth, E.B.; Lee, Y.Y.

    1987-01-01

    Comments are given on some areas of the design considered for the AGS Booster Accelerator, including lattice design, energy and repetition rate, injection, radio frequency system, and the vacuum system. The current status is then briefly described

  8. Design and status of the AGS booster accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, E.B.; Lee, Y.Y.

    1987-01-01

    Comments are given on some areas of the design considered for the AGS Booster Accelerator, including lattice design, energy and repetition rate, injection, radio frequency system, and the vacuum system. The current status is then briefly described. (LEW)

  9. Test results of the AGS Booster low frequency RF system

    International Nuclear Information System (INIS)

    Sanders, R.T.; Cameron, P.; Damm, R.; Dunbar, A.; Goldman, M.; Kasha, D.; McNerney, A.; Meth, M.; Ratti, A.; Spitz, R.

    1993-01-01

    The Band II RF system was originally built to support the Booster operations during the acceleration of heavy ions. Designed to sweep from 0.6 to 2.5 MHz, it was build and successfully tested over a much broader range reaching 4 MHz. Voltages up to more than 20 kV were reached over the design frequency range. The system consists of two stations, each of which is made of one single gap cavity directly driven by a grounded cathode push pull power amplifier. The low Q high permeability ferrites needed in the coaxial cavity in order to reach the lower end of the band make tuning extremely easy. Both systems were thoroughly tested both at single frequencies and on a sweep and are now installed in the ring, ready for operations. Static measurements showed no high-loss effects. The Band 11 system has been fully described in a previous paper; presented here are the results of the ''bench'' tests that lead to important performance improvements

  10. Thermoeconomic model of a commercial transcritical booster refrigeration system

    DEFF Research Database (Denmark)

    Ommen, Torben Schmidt; Elmegaard, Brian

    2011-01-01

    For cooling applications in supermarkets, booster refrigeration systems operating in both transcritical and subcritical conditions are increasingly used. A thermodynamic model of a transcritical booster refrigeration plant is tailored to match the new generation of commercial refrigeration plants...... of exergy for cooling. Second law analysis is needed to illustrate the characteristics of the plant at different load rates, according to the alternating load profile and corresponding to outdoor conditions. With the detailed model, different uses of the analysis are possible, including thermoeconomic...

  11. Booster gold beam injection efficiency and beam loss

    International Nuclear Information System (INIS)

    Zhang, S.Y.; Ahrens, L.A.

    1998-01-01

    The Relativistic Heavy Ion Collider (RHIC) at the BNL requires the AGS to provide Gold beam with the intensity of 10 9 ions per bunch. Over the years, the Tandem Van de Graaff has provided steadily increasing intensity of gold ion beams to the AGS Booster. However, the gold beam injection efficiency at the Booster has been found to decrease with the rising intensity of injected beams. As the result, for Tandem beams of the highest intensity, the Booster late intensity is lower than with slightly lower intensity Tandem beam. In this article, the authors present two experiments associated with the Booster injection efficiency and beam intensity. One experiment looks at the Booster injection efficiency by adjusting the Tandem beam intensity, and another looks at the beam life time while scraping the beam in the Booster. The studies suggest that the gold beam injection efficiency at the AGS Booster is related to the beam loss in the ring, rather than the intensity of injected beam or circulating beam. A close look at the effect of the lost gold ion at the Booster injection leads to the prediction that the lost gold ion creates large number of positive ions, and even larger number of electrons. The lost gold beam is also expected to create large numbers of neutral particles. In 1998 heavy ion run, the production of positive ions and electrons due to the lost gold beam has been observed. Also the high vacuum pressure due to the beam loss, presumably because of the neutral particles it created, has been measured. These results will be reported elsewhere

  12. Analysis of stationary fuel cell dynamic ramping capabilities and ultra capacitor energy storage using high resolution demand data

    Science.gov (United States)

    Meacham, James R.; Jabbari, Faryar; Brouwer, Jacob; Mauzey, Josh L.; Samuelsen, G. Scott

    Current high temperature fuel cell (HTFC) systems used for stationary power applications (in the 200-300 kW size range) have very limited dynamic load following capability or are simply base load devices. Considering the economics of existing electric utility rate structures, there is little incentive to increase HTFC ramping capability beyond 1 kWs -1 (0.4% s -1). However, in order to ease concerns about grid instabilities from utility companies and increase market adoption, HTFC systems will have to increase their ramping abilities, and will likely have to incorporate electrical energy storage (EES). Because batteries have low power densities and limited lifetimes in highly cyclic applications, ultra capacitors may be the EES medium of choice. The current analyses show that, because ultra capacitors have a very low energy storage density, their integration with HTFC systems may not be feasible unless the fuel cell has a ramp rate approaching 10 kWs -1 (4% s -1) when using a worst-case design analysis. This requirement for fast dynamic load response characteristics can be reduced to 1 kWs -1 by utilizing high resolution demand data to properly size ultra capacitor systems and through demand management techniques that reduce load volatility.

  13. Phase ramping and modulation of reflectometer signals

    International Nuclear Information System (INIS)

    Conway, G.D.; Bartlett, D.V.; Stoff, P.E.

    1999-01-01

    The phase and amplitude signals of JET heterodyne reflectometers show varying levels of high frequency turbulence superimposed on a slow changing mean. The phase signal also shows multi-radian (> 1 fringe) variations with two quite different time scales (2-10 ms and sub-ms). In both cases the mean reflected power, together with turbulent phase and amplitude fluctuation levels, are modulated synchronously with the are modulated synchronously with the phase fringes. The slow fringes appear to result radial movement of the cutoff layer with the amplitude modulation possibly due to multiple reflection between plasma and wall. The fast fringes occur in intermittent bursts and appear to be phase runaway resulting from antenna misalignment. Using a 2-D physical optics simulation code it is possible to replicate the fast bursts of phase runaway from steady-state turbulence and misaligned antennas. This offers a possible alternative explanation for some of the observations of bursting turbulence seen in reflectometer signals. (authors)

  14. Phase ramping and modulation of reflectometer signals

    International Nuclear Information System (INIS)

    Conway, G.; Bartlett, D.; Stott, P.

    1999-06-01

    The phase and amplitude signals of JET heterodyne reflectometers show varying levels of high frequency turbulence superimposed on a slow changing mean. The phase signal also shows multi-radian (>1 fringe) variations with two quite different time scales (2-10ms and sub-ms). In both cases the mean reflected power, together with turbulent phase and amplitude fluctuation levels, are modulated synchronously with the phase fringes. The slow fringes appear to result from radial movement of the cutoff layer with the amplitude modulation possibly due to multiple reflection between plasma and wall. The fast fringes occur in intermittent bursts and appear to be phase runaway resulting from antenna misalignment. Using a 2D physical optics simulation code it is possible to replicate the fast bursts of phase runaway from steady-state turbulence and misaligned antennas. This offers a possible alternative explanation for some of the observations of bursting turbulence seen in reflectometer signals. (author)

  15. Improvement of seawater booster pump outlet check valve

    International Nuclear Information System (INIS)

    Li Xuning; Du Yansong; Huang Huimin

    2010-01-01

    Conventional island seawater booster pump set of QNPC 310 MWe unit are very important in the whole circulating cooling system, and the integrate function of seawater booster pump outlet check valve is the foundation of steady operation of the seawater booster pump set. The article mainly introduce that through the analyses to the reason to the problem that the seawater booster pump outlet check valve of QNPC 310 MWe unit appeared in past years by our team, and considering the influence of operation condition and circumstance, the team improve the seawater booster pump outlet check valve from swing check valve to shuttle check valve which operate more appropriately in the system. By the test of continuous practice, we make further modification to the inner structure of shuttle check valve contrapuntally, and therefore we solve the problem in seawater booster pump outlet check valve fundamentally which has troubled the security of system operation in past years, so we realize the aim of technical improvement and ensure that the system operate in safety and stability. (authors)

  16. FCC-ee Pre-Booster Accelerators

    CERN Document Server

    Ogur, S; Zimmermann, F

    2017-01-01

    CERN’s ambitious new project, Future Circular Collider-ee, will have four operations as Z, W, H, and tt factories covering energies from 45.6 to 175 GeV. The main challenge of Z-operation is to achieve currents as high as 1450 mA; this will depend heavily on the injector. For this reason, we conclude that we need a high bunch charge of 3.3 × 1010, for both e− and e+, and fill 91 500 of each of those bunches into the collider. To achieve the goal, we have designed an S-band (2.856 GHz) normal conducting electron linac up to 6 GeV, which we will use to create and accelerate both electrons and positrons. Positrons will be created inside the linac at 4.46 GeV, will be accelerated up to 1.54 GeV at the linac, and will then be transferred to the designed damping ring. In this paper, we present the designed linac, damping ring, and the operational requirements of the 100 km booster.

  17. Glide back booster wind tunnel model testing

    Science.gov (United States)

    Pricop, M. V.; Cojocaru, M. G.; Stoica, C. I.; Niculescu, M. L.; Neculaescu, A. M.; Persinaru, A. G.; Boscoianu, M.

    2017-07-01

    Affordable space access requires partial or ideally full launch vehicle reuse, which is in line with clean environment requirement. Although the idea is old, the practical use is difficult, requiring very large technology investment for qualification. Rocket gliders like Space Shuttle have been successfullyoperated but the price and correspondingly the energy footprint were found not sustainable. For medium launchers, finally there is a very promising platform as Falcon 9. For very small launchers the situation is more complex, because the performance index (payload to start mass) is already small, versus medium and heavy launchers. For partial reusable micro launchers this index is even smaller. However the challenge has to be taken because it is likely that in a multiyear effort, technology is going to enable the performance recovery to make such a system economically and environmentally feasible. The current paper is devoted to a small unitary glide back booster which is foreseen to be assembled in a number of possible configurations. Although the level of analysis is not deep, the solution is analyzed from the aerodynamic point of view. A wind tunnel model is designed, with an active canard, to enablea more efficient wind tunnel campaign, as a national level premiere.

  18. Booster Applications Facility report, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Thieberger, P. (ed.)

    1991-06-01

    This report summarizes studies and planning performed by Brookhaven National Laboratory (BNL) personnel at the request of NASA for the design, construction and operation of experimental areas and facilities for utilization of ion beams from the BNL Booster synchrotron particle accelerator. These facilities would be primarily utilized to simulate space radiation for radiobiological research, shielding studies and detector calibrations. The feasibility of such a project has been established, preliminary designs and cost estimates have been developed and a formal proposal can be submitted pending DOE concurrence. The main body of this report consists of the material presented by BNL during the meeting with a NASA appointed Panel on December 10 and 11, 1990. The individual speakers have provided brief summaries of their talks and explanations of their figures. In addition there are two appendices. One, contains detailed discussion of the shared mode of operation and the corresponding beam compatibility tables. The second appendix contains cost estimate details. An executive summary on budgets and schedules has been added, containing possible phased construction and outfitting scenarios and the corresponding expense and commitment profiles as well as new operational cost estimates. Material contained in the executive summary reflects the correction of some errors and new studies performed in response to the NASA Panel suggestions.

  19. Vehicle operation characteristic under different ramp entrance conditions in underground road: Analysis, simulation and modelling

    Science.gov (United States)

    Yao, Qiming; Liu, Shuo; Liu, Yang

    2018-05-01

    An experimental design was used to study the vehicle operation characteristics of different ramp entrance conditions in underground road. With driving simulator, the experimental scenarios include left or right ramp with first, second and third service level, respectively, to collect vehicle speed, acceleration, lateral displacement and location information at the ramp entrance section. By using paired t-test and ANOVA, the influence factors of vehicle operating characteristics are studied. The result shows that effects of ramp layout and mainline traffic environment on vehicle operation characteristics are significant. The regression model of vehicle traveling distance on acceleration lane is established. Suggestions are made for ramp entrance design of underground road.

  20. Engineering task plan for steam line ramp calculations

    International Nuclear Information System (INIS)

    DeSantis, G.N.; Freeman, R.D.

    1994-01-01

    The purpose of this document is to provide an approved work plan to perform calculations that verify the load limits of a proposed ramp over a steam line at the back side (East side) of SY Farm in support of work package 2W-94-00812/K. The objective of this supporting document is to provide Operations with a set of checked calculations that verify the ramp over the steam line at SY Farm will support a fully loaded concrete mixer truck without affecting the steam line. The calculations will be performed by an engineers from Facility Systems and independently checked and reviewed by another engineer. The calculations may then be added to the work package. If Operations decides to make any configuration changes to the steam line or surrounding area, Operations shall have these changes documented by an Engineering Change Notice (ECN). This ECN can be done by Facility Systems or any other engineering organization at the direction of Operations

  1. Test results of BM109 magnet field stability during ramping

    International Nuclear Information System (INIS)

    Kristalinski, A.

    1992-12-01

    This report presents results of the measured lag between the current ramp and the following magnetic field rise in BM109 magnets. The purpose of these tests is to choose identical ramping programs for PC4AN1, PC4AN2 and PC4AN3 magnets. The lag occurs due to the large eddy currents in the magnets' solid iron cores. The experiment requires a magnetic field stability of 0.1% during beam presence. Using existing equipment and a program slope of 100 Amp/sec starting at Tl yields fields within the 0.05% of set value. Add to this 0.05% for P.S. regulation to meet the required field stability of 0.1%. This program yields annual savings of $200,000 (assuming 100% usage) . Additional savings can be made by using faster slopes, but this requires additional controls

  2. Reinforcement Learning for Ramp Control: An Analysis of Learning Parameters

    Directory of Open Access Journals (Sweden)

    Chao Lu

    2016-08-01

    Full Text Available Reinforcement Learning (RL has been proposed to deal with ramp control problems under dynamic traffic conditions; however, there is a lack of sufficient research on the behaviour and impacts of different learning parameters. This paper describes a ramp control agent based on the RL mechanism and thoroughly analyzed the influence of three learning parameters; namely, learning rate, discount rate and action selection parameter on the algorithm performance. Two indices for the learning speed and convergence stability were used to measure the algorithm performance, based on which a series of simulation-based experiments were designed and conducted by using a macroscopic traffic flow model. Simulation results showed that, compared with the discount rate, the learning rate and action selection parameter made more remarkable impacts on the algorithm performance. Based on the analysis, some suggestionsabout how to select suitable parameter values that can achieve a superior performance were provided.

  3. Prosthodontic management of mandibular deviation using palatal ramp appliance

    Directory of Open Access Journals (Sweden)

    Prince Kumar

    2012-08-01

    Full Text Available Segmental resection of the mandible generally results in deviation of the mandible to the defective side. This loss of continuity of the mandible destroys the balance of the lower face and leads to decreased mandibular function by deviation of the residual segment toward the surgical site. Prosthetic methods advocated to reduce or eliminate mandibular deviation include intermaxillary fixation, removable mandibular guide flange, palatal ramp, implant-supported prosthesis and palatal guidance restorations which may be useful in reducing mandibular deviation and improving masticatory performance and efficiency. These methods and restorations would be combined with a well organized mandibular exercise regimen. This clinical report describes the rehabilitation following segmental mandibulectomy using palatal ramp prosthesis.

  4. ALTERNATIVE MATERIALS FOR RAMP-EDGE SNS JUNCTIONS

    International Nuclear Information System (INIS)

    Jia, Q.; Fan, Y.; Gim, Y.

    1999-01-01

    We report on the processing optimization and fabrication of ramp-edge high-temperature superconducting junctions by using alternative materials for both superconductor electrodes and normal-metal barrier. By using Ag-doped YBa 2 Cu 3 O 7-x (Ag:YBCO) as electrodes and a cation-modified compound of (Pr y Gd 0.6-y )Ca 0.4 Ba 1.6 La 0.4 Cu 3 O 7 (y = 0.4, 0.5, and 0.6) as a normal-metal barrier, high-temperature superconducting Josephson junctions have been fabricated in a ramp-edge superconductor/normal-metal/superconductor (SNS) configuration. By using Ag:YBCO as electrodes, we have found that the processing controllability /reproducibility and the stability of the SNS junctions are improved substantially. The junctions fabricated with these alternative materials show well-defined RSJ-like current vs voltage characteristics at liquid nitrogen temperature

  5. Study on Trailing Edge Ramp of Supercritical Airfoil

    Science.gov (United States)

    2016-03-30

    China Abstract Trailing edge flow control method could improve the performance of supercritical airfoil with a small modification on the original...stall behaviour . As a result, the non-separation ramp could increase the thickness of airfoil, which benefits wing structure and aerodynamic...direction based on the original RAE2822 airfoil, which will thicken the airfoil. The interpolation is implemented as shown in Eqn. 1. This modification could

  6. Lower hybrid wave current ramp-up and plasma equilibrium

    International Nuclear Information System (INIS)

    Gong Xueyu

    1996-01-01

    Questions on lower hybrid driven current and plasma equilibrium are studied. With the induced electric field taken into account, a system of self-consistent equations is obtained. This theory has been applied to some moments of the current ramp-up phase for the Tokamak Engineering Test Breeder (TETB) to study the lower hybrid current drive and MHD equilibrium. So, better electron current and safety factor profiles are obtained

  7. Monte Carlo modeling and analyses of YALINA-booster subcritical assembly part 1: analytical models and main neutronics parameters

    International Nuclear Information System (INIS)

    Talamo, A.; Gohar, M. Y. A.; Nuclear Engineering Division

    2008-01-01

    This study was carried out to model and analyze the YALINA-Booster facility, of the Joint Institute for Power and Nuclear Research of Belarus, with the long term objective of advancing the utilization of accelerator driven systems for the incineration of nuclear waste. The YALINA-Booster facility is a subcritical assembly, driven by an external neutron source, which has been constructed to study the neutron physics and to develop and refine methodologies to control the operation of accelerator driven systems. The external neutron source consists of Californium-252 spontaneous fission neutrons, 2.45 MeV neutrons from Deuterium-Deuterium reactions, or 14.1 MeV neutrons from Deuterium-Tritium reactions. In the latter two cases a deuteron beam is used to generate the neutrons. This study is a part of the collaborative activity between Argonne National Laboratory (ANL) of USA and the Joint Institute for Power and Nuclear Research of Belarus. In addition, the International Atomic Energy Agency (IAEA) has a coordinated research project benchmarking and comparing the results of different numerical codes with the experimental data available from the YALINA-Booster facility and ANL has a leading role coordinating the IAEA activity. The YALINA-Booster facility has been modeled according to the benchmark specifications defined for the IAEA activity without any geometrical homogenization using the Monte Carlo codes MONK and MCNP/MCNPX/MCB. The MONK model perfectly matches the MCNP one. The computational analyses have been extended through the MCB code, which is an extension of the MCNP code with burnup capability because of its additional feature for analyzing source driven multiplying assemblies. The main neutronics parameters of the YALINA-Booster facility were calculated using these computer codes with different nuclear data libraries based on ENDF/B-VI-0, -6, JEF-2.2, and JEF-3.1

  8. Monte Carlo modeling and analyses of YALINA-booster subcritical assembly part 1: analytical models and main neutronics parameters.

    Energy Technology Data Exchange (ETDEWEB)

    Talamo, A.; Gohar, M. Y. A.; Nuclear Engineering Division

    2008-09-11

    This study was carried out to model and analyze the YALINA-Booster facility, of the Joint Institute for Power and Nuclear Research of Belarus, with the long term objective of advancing the utilization of accelerator driven systems for the incineration of nuclear waste. The YALINA-Booster facility is a subcritical assembly, driven by an external neutron source, which has been constructed to study the neutron physics and to develop and refine methodologies to control the operation of accelerator driven systems. The external neutron source consists of Californium-252 spontaneous fission neutrons, 2.45 MeV neutrons from Deuterium-Deuterium reactions, or 14.1 MeV neutrons from Deuterium-Tritium reactions. In the latter two cases a deuteron beam is used to generate the neutrons. This study is a part of the collaborative activity between Argonne National Laboratory (ANL) of USA and the Joint Institute for Power and Nuclear Research of Belarus. In addition, the International Atomic Energy Agency (IAEA) has a coordinated research project benchmarking and comparing the results of different numerical codes with the experimental data available from the YALINA-Booster facility and ANL has a leading role coordinating the IAEA activity. The YALINA-Booster facility has been modeled according to the benchmark specifications defined for the IAEA activity without any geometrical homogenization using the Monte Carlo codes MONK and MCNP/MCNPX/MCB. The MONK model perfectly matches the MCNP one. The computational analyses have been extended through the MCB code, which is an extension of the MCNP code with burnup capability because of its additional feature for analyzing source driven multiplying assemblies. The main neutronics parameters of the YALINA-Booster facility were calculated using these computer codes with different nuclear data libraries based on ENDF/B-VI-0, -6, JEF-2.2, and JEF-3.1.

  9. Booster Main Engine Selection Criteria for the Liquid Fly-Back Booster

    Science.gov (United States)

    Ryan, Richard M.; Rothschild, William J.; Christensen, David L.

    1998-01-01

    The Liquid Fly-Back Booster (LFBB) Program seeks to enhance the Space Shuttle system safety performance and economy of operations through the use of an advanced, liquid propellant Booster Main Engine (BME). There are several viable BME candidates that could be suitable for this application. The objective of this study was to identify the key criteria to be applied in selecting among these BME candidates. This study involved an assessment of influences on the overall LFBB utility due to variations in the candidate rocket engines' characteristics. This includes BME impacts on vehicle system weight, perfortnance,design approaches, abort modes, margins of safety, engine-out operations, and maintenance and support concepts. Systems engineering analyses and trade studies were performed to identify the LFBB system level sensitivities to a wide variety of BME related parameters. This presentation summarizes these trade studies and the resulting findings of the LFBB design teams regarding the BME characteristics that most significantly affect the LFBB system. The resulting BME choice should offer the best combination of reliability, performance, reusability, robustness, cost, and risk for the LFBB program.

  10. Frequency of booster injections of allergoids.

    Science.gov (United States)

    Norman, P S; Creticos, P S; Marsh, D G

    1990-01-01

    In 1982, 43 ragweed-sensitive patients receiving maintenance injections of full doses of ragweed allergoid were selected for a study of the immunologic and clinical efficacy of booster injections only four times a year. These patients had participated for 2 to 7 years as part of a trial of mixes of up to four allergoids to common pollens in the mid-Atlantic area tailored to each patient's skin test sensitivity. They were divided into a group (21 patients) to receive injections every 3 months and a group (22 patients) to receive injections about every 6 weeks (eight injections per year). Patients were rerandomized after 1 year so that half of each original group switched to the alternate treatment, and this program was continued until after the ragweed season of 1985. Thirty-four patients were still under study the last year. Doses, per injection, were 100 allergoid units (1 allergoid unit equals 100 PNU) of each allergen in the mixture. Symptom scores during the 8 weeks of each of the four ragweed seasons were not significantly higher in the 3-month treated group. IgG antibody levels to Amb a I (antigen E) were followed until early 1984 and were not significantly different in the two groups, even though the 6-week treated patients received a two times higher cumulative dose per year. Rates of local and systemic reactions (percent of injections eliciting reactions) were not different in the groups, which means that the 3-month treated group had about half as many reactions by virtue of taking half as many injections.(ABSTRACT TRUNCATED AT 250 WORDS)

  11. Transversely-biased ferrite-tuned cavity for the SSC booster

    International Nuclear Information System (INIS)

    Carlini, R.D.; Friedrichs, C. Jr.; Thiessen, H.A.

    1985-01-01

    Ferrite tuning of rf cavities is used to provide the change in frequency necessary as the velocity of particles in synchrotrons increases. A new technique in which the ferrite bias field is applied in a direction perpendicular to the rf field offers the possibility of greatly reducing the rf power dissipation in the ferrite. A possible 60 MHz design is discussed for the SSC booster. The cavity design is based on a simple coaxial quarter-wave resonator. A brief discussion is given fo the theory of perpendicular biasing. The measured electric Q's of five different microwave-type ferrite samples are reported and compared with the manufacturer's specifications. 9 fig

  12. Lactate minimum in a ramp protocol and its validity to estimate the maximal lactate steady state

    Directory of Open Access Journals (Sweden)

    Emerson Pardono

    2009-01-01

    Full Text Available http://dx.doi.org/10.5007/1980-0037.2009v11n2p174   The objectives of this study were to evaluate the validity of the lactate minimum (LM using a ramp protocol for the determination of LM intensity (LMI, and to estimate the exercise intensity corresponding to maximal blood lactate steady state (MLSS. In addition, the possibility of determining aerobic and anaerobic fitness was investigated. Fourteen male cyclists of regional level performed one LM protocol on a cycle ergometer (Excalibur–Lode consisting of an incremental test at an initial workload of 75 Watts, with increments of 1 Watt every 6 seconds. Hyperlactatemia was induced by a 30-second Wingate anaerobic test (WAT (Monark–834E at a workload corresponding to 8.57% of the volunteer’s body weight. Peak power (11.5±2 Watts/kg, mean power output (9.8±1.7 Watts/kg, fatigue index (33.7±2.3% and lactate 7 min after WAT (10.5±2.3 mmol/L were determined. The incremental test identified LMI (207.8±17.7 Watts and its respective blood lactate concentration (2.9±0.7 mmol/L, heart rate (153.6±10.6 bpm, and also maximal aerobic power (305.2±31.0 Watts. MLSS intensity was identified by 2 to 4 constant exercise tests (207.8±17.7 Watts, with no difference compared to LMI and good agreement between the two parameters. The LM test using a ramp protocol seems to be a valid method for the identification of LMI and estimation of MLSS intensity in regional cyclists. In addition, both anaerobic and aerobic fitness parameters were identified during a single session.

  13. Confinement and transport properties during current ramps in the ASDEX Upgrade tokamak

    Science.gov (United States)

    Fable, E.; Angioni, C.; Hobirk, J.; Pereverzev, G.; Fietz, S.; Hein, T.; ASDEX Upgrade Team

    2011-04-01

    A detailed analysis of experimental data from the ASDEX Upgrade tokamak is carried out to shed light on the properties of confinement and transport in the current ramp-up and ramp-down phases of the plasma discharge. The experimental database is used to identify the relevant ranges of parameters explored during the ramp-up and the ramp-down. The energy confinement time observed in the two ramps displays interesting evolution, in many cases attaining different values at the same current level between ramp-up and ramp-down. The possible reasons for this behaviour are investigated. Interpretative transport simulations are used as a tool to clarify the interplay between different parameters, which are coupled in a non-linear way. In addition, a theory-based transport model is used to understand the behaviour of confinement as observed in the experiment, evidencing the role of both turbulent and neoclassical transport. Linear gyrokinetic calculations are performed to identify the relevant turbulence regime, showing that a broad range of frequencies, in the trapped electron modes (TEMs) and in the ion temperature gradient modes (ITGs) regimes, is explored during both the ramp-up and ramp-down. In the same framework, a quasi-linear model is applied to calculate the value of the local logarithmic density gradient and compare it with the experimental value. Finally, first non-linear simulations of heat transport during the current ramps are presented.

  14. LS1 Report: first beams in the Booster

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Monday, 2 June, the Operations Group injected the first beams into the PS Booster (PSB). The PSB, the second machine in the LHC injector chain to be recommissioned (Linac2 was the first), also provides beams for non-LHC experiments, some of which will need beams for physics as early as this summer.   The PS Booster. The Operations Group has been back in control of the PS Booster for a month now, having taken over where the engineers and experts of the EN Department, who were responsible for the maintenance work, left off. The group first ran tests with no beam (known as “cold check-out”) to check and requalify all the machine instrumentation, from the control room to the ring itself. Now in beam mode, the Booster is being prepared both to begin supplying the PS at the end of June and, above all, for physics to restart in the ISOLDE experimental area. The PS Booster console in the CERN Control Centre. “We have around 15 types of beams to ‘prepa...

  15. Thermal instability observations during ramp tests in the Studsvik R2 reactor

    International Nuclear Information System (INIS)

    Roennberg, G.; Kjaer-Pedersen, N.

    1984-01-01

    A series of ramp tests on ENC-built BWR fuel from the Big Rock Point reactor was performed in September 1982 in the Studsvik R2 Reactor. The tests involved segmented rods with a burnup of 18 MWd/KgU, and constituted part of the Fuel Performance Improvement Program sponsored by the United States Department of Energy. Rods of different designs were tested. The reference design had solid, dished pellets and was unpressurized. The alternative designs were annular pellets and sphere-pac. Some of the rods with annular pellets were prepressurized, and some were not. During the ramp tests the rod power is controlled by a helium depressurization loop which causes a strictly linear power ramp versus time. The thermal output of the test rig is measured calorimetrically, the data immediately being recorded on a strip chart and later processed by a computer. Furthermore, elongation detectors permit the immediate recording of the rod length variation versus time. For some of the rods the thermal output went constant for a fraction of a minute after reaching a certain value, then continued to rise, while the helium depressurization continued to proceed linearly with time. For the duration of this plateau of the thermal output curve the slope of the elongation detector signal was significantly higher than before, but fell back to its original value after the plateau. This observation was made only for the reference rods. None of the annular rods, with or without prepressurization, nor the sphere-pac rods, showed the effect. When observed, the effect occurred at about 40 kw/m. The effect is attributed to fission gas release rapidly being enhanced by thermal feedback. The increase in stored energy associated with the temperature rise in the fuel causes the delay in thermal output. The larger available internal volume and/or the prepressurization of the annular rods, and the lack of a distinct fuel-clad gap for the sphere-pac rods prevented the effect from occurring in those other

  16. Safety aspects of pulsed YAYOI and Japan Linac Booster

    International Nuclear Information System (INIS)

    An, S.; Oka, Y.; Wakabayashi, J.

    1976-01-01

    The paper consists of two parts. The first part is concerned with safety aspects of pulsed YAYOI. Reactivity pulsed operation of YAYOI is performed with reactivity oscillating devices. Inherent safety characteristics due to dilation of metal fuel, a small amount of f.p. build up, reactor operation preserving fuel integrity and experience on transient experiments are the principal basis for safety assurance. Conditions for pulsed operation, namely, maximum allowable temperature, maximum number of repetition of pulsed operation and so on are derived from the consideration on the integrity of fuel. Instrumentation and control systems are reinforced by displacement meter in the core, interlock system, special timer for pulsed operation, additional scram conditions and reactivity meter. Accident analysis and safety evaluation indicate the conservative safety features of the facility. Concerning pulsed operation of YAYOI combined with Linac, special attention must be given to the design of Linac target placed in the core. In the second part are described the principal guide-lines and basic ideas for safety design of Japan Linac Booster (JLB). JLB is a U-Mo fueled and sodium cooled fast reactor with rotating reflector and Linac target in the core. The pulsed neutrons are injected into the core coincidentally with repetitive peaks of reactivity. Design of rotating reflector and Linac target system are the new and important safety problems not yet encountered in the usual sodium fast reactor design. The axis of the rotating reflector is horizontal, which avoids the collision of reflector block with core in the case of failure of rotating reflector. The separate cooling channels for target and the Linac electron beam control system are provided. Reactor shut down and power control systems must be carefully designed. Core meltdown and disassembly accident is considered as a hypothetical accident which is a basis for containment system design. (auth.)

  17. Applied Distributed Model Predictive Control for Energy Efficient Buildings and Ramp Metering

    Science.gov (United States)

    Koehler, Sarah Muraoka

    Industrial large-scale control problems present an interesting algorithmic design challenge. A number of controllers must cooperate in real-time on a network of embedded hardware with limited computing power in order to maximize system efficiency while respecting constraints and despite communication delays. Model predictive control (MPC) can automatically synthesize a centralized controller which optimizes an objective function subject to a system model, constraints, and predictions of disturbance. Unfortunately, the computations required by model predictive controllers for large-scale systems often limit its industrial implementation only to medium-scale slow processes. Distributed model predictive control (DMPC) enters the picture as a way to decentralize a large-scale model predictive control problem. The main idea of DMPC is to split the computations required by the MPC problem amongst distributed processors that can compute in parallel and communicate iteratively to find a solution. Some popularly proposed solutions are distributed optimization algorithms such as dual decomposition and the alternating direction method of multipliers (ADMM). However, these algorithms ignore two practical challenges: substantial communication delays present in control systems and also problem non-convexity. This thesis presents two novel and practically effective DMPC algorithms. The first DMPC algorithm is based on a primal-dual active-set method which achieves fast convergence, making it suitable for large-scale control applications which have a large communication delay across its communication network. In particular, this algorithm is suited for MPC problems with a quadratic cost, linear dynamics, forecasted demand, and box constraints. We measure the performance of this algorithm and show that it significantly outperforms both dual decomposition and ADMM in the presence of communication delay. The second DMPC algorithm is based on an inexact interior point method which is

  18. New Pulsed Orbit Bump Magnets for the Fermilab Booster Synchrotron

    CERN Document Server

    Lackey, James; John, Carson; Kashikhin, Vladimir; Makarov, Alexander; Prebys, Eric

    2005-01-01

    The beam from the Fermilab Linac is injected onto a bump in the closed orbit of the Booster Synchrotron where a carbon foil strips the electrons from the Linac’s negative ion hydrogen beam. Although the Booster itself runs at 15Hz, heat dissipation in the orbit bump magnets has been one limitation to the fraction of the cycles that can be used for beam. New, 0.28T pulsed window frame dipole magnets have been constructed that will fit into the same space as the old ones, run at the full repetition rate of the Booster, and provide a larger bump to allow a cleaner injection orbit. The new magnets use a high saturation flux density Ni-Zn ferrite in the yoke rather than laminated steel. The presented magnetic design includes two and three dimensional magnetic field calculations with eddy currents and ferrite nonlinear effects.

  19. Assessment of peak oxygen uptake during handcycling: Test-retest reliability and comparison of a ramp-incremented and perceptually-regulated exercise test.

    Science.gov (United States)

    Hutchinson, Michael J; Paulson, Thomas A W; Eston, Roger; Goosey-Tolfrey, Victoria L

    2017-01-01

    To examine the reliability of a perceptually-regulated maximal exercise test (PRETmax) to measure peak oxygen uptake ([Formula: see text]) during handcycle exercise and to compare peak responses to those derived from a ramp-incremented protocol (RAMP). Twenty recreationally active individuals (14 male, 6 female) completed four trials across a 2-week period, using a randomised, counterbalanced design. Participants completed two RAMP protocols (20 W·min-1) in week 1, followed by two PRETmax in week 2, or vice versa. The PRETmax comprised five, 2-min stages clamped at Ratings of Perceived Exertion (RPE) 11, 13, 15, 17 and 20. Participants changed power output (PO) as often as required to maintain target RPE. Gas exchange variables (oxygen uptake, carbon dioxide production, minute ventilation), heart rate (HR) and PO were collected throughout. Differentiated RPE were collected at the end of each stage throughout trials. For relative [Formula: see text], coefficient of variation (CV) was equal to 4.1% and 4.8%, with ICC(3,1) of 0.92 and 0.85 for repeated measures from PRETmax and RAMP, respectively. Measurement error was 0.15 L·min-1 and 2.11 ml·kg-1·min-1 in PRETmax and 0.16 L·min-1 and 2.29 ml·kg-1·min-1 during RAMP for determining absolute and relative [Formula: see text], respectively. The difference in [Formula: see text] between PRETmax and RAMP was tending towards statistical significance (26.2 ± 5.1 versus 24.3 ± 4.0 ml·kg-1·min-1, P = 0.055). The 95% LoA were -1.9 ± 4.1 (-9.9 to 6.2) ml·kg-1·min-1. The PRETmax can be used as a reliable test to measure [Formula: see text] during handcycle exercise in recreationally active participants. Whilst PRETmax tended towards significantly greater [Formula: see text] values than RAMP, the difference is smaller than measurement error of determining [Formula: see text] from PRETmax and RAMP.

  20. The Booster to AGS beam transfer fast kicker systems

    International Nuclear Information System (INIS)

    Zhang, W.; Bunicci, J.; Soukas, A.V.; Zhang, S.Y.

    1992-01-01

    The Brookhaven AGS Booster has a very successful commissioning period in June 1991. The third phase of that commissioning was a beam extraction test. The Booster extraction fast kicker (F3) deflected a 1.2 GeV proton beam from the Booster circulating orbit into the extraction septum aperture, partially down the extraction line to a temporary beam stop. Now, the Booster is committed to the AGS operations program for both heavy ion and proton beams. Thus, the Booster extraction and the corresponding AGS injection systems must operate routinely up to a pulse repetition frequency of 7.5 Hertz, and up to a beam energy of 1.5 Gev. The injection fast kicker is located in the A5 section of the AGS ring and is used to deflect the proton or heavy ion beam into its final AGS closed orbit. A distinctive feature of the AGS injection fast kicker modulators is the tail-bitting function required for proton beam injection. This enables the system to produce a fast current fall time to go along with the high current pulse amplitude with a fast rise time. The AGS injection fast kicker system has three pulse modulators, and each modulator consists of two thyratrons. The main PFN thyratrons switch on the current, and the tail bitting thyratrons are used to force the magnet current to decrease rapidly. Two digital pulse delay generators are used to align the main thyratrons and the tail bitting thyratrons respectively. The system has been tested and installed. The final commissioning of the Booster to AGS beam transfer line and injection is currently being undertaken. In this article, the system design, realization techniques and performance data will be presented

  1. Effects of Linear Falling Ramp Reset Pulse on Addressing Operation in AC PDP

    International Nuclear Information System (INIS)

    Liu Zujun; Liang Zhihu; Liu Chunliang; Meng Lingguo

    2006-01-01

    The effects of linear falling ramp reset pulse related to addressing operation in an alternating current plasma display panel (AC PDP) were studied. The wall charge waveforms were measured by the electrode balance method in a 12-inch coplanar AC PDP. The wall charge waveforms show the relationship between the slope ratio of the falling ramp reset pulse and the wall charges at the end of the falling ramp reset pulse which influences the addressing stability. Then the effects of the slope ratio of the linear falling ramp reset pulse on the addressing voltage and addressing time were investigated. The experimental results show that the minimum addressing voltage increases with the increase of the slope ratio of the falling ramp reset pulse, and so does the minimum addressing time. Based on the experimental results, the optimization of the addressing time and the slope ratio of the falling ramp pulse is discussed

  2. Effects of ramp reset pulses on the address discharge in a shadow mask plasma display panel

    International Nuclear Information System (INIS)

    Yang Lanlan; Tu Yan; Zhang Xiong; Jiang Youyan; Zhang Jian; Wang Baoping

    2007-01-01

    A two-dimensional self-consistent numerical simulation model is used to analyse the effects of the ramp reset pulses on the address discharge in a shadow mask plasma display panel (SM-PDP). Some basic parameters such as the slope of the ramp pulse and the terminal voltage of the ramp reset period are varied to investigate their effects. The simulation results illustrate that the wall voltage is mainly decided by the terminal voltage and the firing voltage at the end of the ramp reset period. Moreover, the variation of the ramp slope will also bring a few modifications to the wall voltage. The priming particles in the beginning of the addressing period are related to the slope of the ramping down voltage pulse. The simulation results can help us optimize the driving scheme of the SM-PDP

  3. Observation and correction of resonance stopbands in the AGS Booster

    International Nuclear Information System (INIS)

    Gardner, C.; Shoji, Y.; Ahrens, L.; Glenn, J.W.; Lee, Y.Y.; Roser, T.; Soukas, A.; van Asselt, W.; Weng, W.T.

    1993-01-01

    At the design intensity of 1.5 x 10 13 ppp, the space charge tune shift in the AGS Booster at injection has been estimated to be about 0.35. Therefore, the beam is spread over may lower order resonance lines and the stopbands have to be corrected to minimize the amplitude growth by proper compensation of the driving harmonics resulting from random errors. The observation and correction of second and third order resonance stopbands in the AGS Booster, and the establishment of a favorable operating point at high intensity are discussed

  4. Injection and transfer lines of the PS Booster

    CERN Multimedia

    Photographic Service

    1972-01-01

    In the foreground is the vacuum chamber for the 50 MeV proton beam coming from the Linac. The tank held by white frames houses the "Vertical Distributor", which deflects the Linac beam to the levels of the Booster's 4 superposed rings. After acceleration in the Booster, originally to 800 MeV, today to 1.4 GeV, the beams from the 4 rings are combined in the vertical plane and transfered to the 26 GeV PS. The "Recombination Line", intersecting the injection line, crosses the picture from left to right.

  5. Design study of CEPC Alternating Magnetic Field Booster

    CERN Document Server

    Bian, T; Cai, Y; Cui, X; Gao, J; Koratzinos, M; Su, F; Wang, D; Wang, Y; Xiao, M; Zhang, C

    2017-01-01

    The CEPC is a next generation circular e+e- collider proposed by China. The design of the full energy booster ring of the CEPC is especially challenging. The ejected beam energy is 120 GeV, but that of the injected beam is only 6 GeV. In a conventional approach, the low magnetic field of the main dipole magnets creates problems. We propose operating the booster ring as a large wiggler at low beam energies and as a normal ring at high energies to avoid the problem of very low dipole magnet fields.

  6. Analysis of resonance-driving imperfections in the AGS Booster

    International Nuclear Information System (INIS)

    Gardner, C.; Shoji, Y.; Danby, G.; Glenn, J.W.; Jackson, G.J.; Soukas, A.; van Asselt, W.; Whalen, C.

    1994-01-01

    At the design intensity of 1.5 x 10 13 ppp, the space charge tune shift in the AGS Booster at injection has been estimated to be about 0.35. The beam tunes are therefore spread over many lower order resonance lines and the associated stopbands must be corrected in order to minimize the amplitude growth due to resonance excitation. This requires proper compensation of the resonance-driving harmonics which result from random magnetic field errors. The observation and correction of second and third order resonance stopbands in the AGS Booster is reviewed, and an analysis of magnetic field imperfections based on the required corrections is given

  7. Fiber optics in the BNL Booster radiation environment

    International Nuclear Information System (INIS)

    Beadle, E.R.

    1991-01-01

    The Booster instrumentation uses analog and digital fiber optic links, designed to withstand at least 50 krads without performance degradation. The links use inexpensive and commercially available components that operate at a center wavelength of 820 nm. The analog link operates to 30 MHz over a 200 m fiber and can provide insertion gain. The digital link provides 60 ns timing pulses without the dispersive effects of coaxial cables. The optical fiber is a step-index hard clad silica type with a 200 micron core. This paper presents the component selection criteria, link design, installation, testing and performance for the optical links in the Booster instrumentation systems

  8. Design of the AGS Booster Beam Position Monitor electronics

    International Nuclear Information System (INIS)

    Ciardullo, D.J.; Smith, G.A.; Beadle, E.R.

    1991-01-01

    The operational requirements of the AGS Booster Beam Position Monitor system necessitate the use of electronics with wide dynamic range and broad instantaneous bandwidth. Bunch synchronization is provided by a remote timing sequencer coupled to the local ring electronics via digital fiber-optic links. The Sequencer and local ring circuitry work together to provide single turn trajectory or average orbit and intensity information, integrated over 1 to 225 bunches. Test capabilities are built in for the purpose of enhancing BPM system accuracy. This paper describes the design of the Booster Beam Position Monitor electronics, and presents performance details of the front end processing, acquisition and timing circuitry

  9. Measured longitudinal beam impedance of booster gradient magnets; TOPICAL

    International Nuclear Information System (INIS)

    James L Crisp and Brian J. Fellenz

    2001-01-01

    The Booster gradient magnets have no vacuum pipe which forces the beam image current to flow along the laminated pole tips. Both D and F style magnets were measured with a stretched wire to determine the longitudinal beam impedance caused by these laminations. Results are compared to calculations done 30 years ago. The inductive part of the magnet impedance is interesting because it partially compensates for the negative inductance effects of space charge on the beam. An R/L circuit consisting of 37K(center d ot) in parallel with between 40 and 100uH is a reasonable approximation to the total impedance of Booster magnet laminations

  10. Chromaticity measurement during beam energy ramp in Indus-2

    International Nuclear Information System (INIS)

    Husain, Riyasat; Vats, D.K.; Ghodke, A.D.

    2013-01-01

    Chromaticity is one of the important parameters of circular accelerators and plays crucial role in its operation. In Indus-2 storage ring the natural chromaticity is -19 and -12 in horizontal and vertical planes respectively. For the good injection at 550 MeV in Indus-2, chromaticity needs to be kept at (+1, +1). The corrected chromaticity does not remain constant during the energy ramp up to 2.5 GeV. We measured Indus-2 storage ring chromaticity by the conventional RF frequency change method. The measurement method and the result of the measurement are reported in this paper. (author)

  11. Pharmacological characterization of receptor-activity-modifying proteins (RAMPs) and the human calcitonin receptor.

    Science.gov (United States)

    Armour, S L; Foord, S; Kenakin, T; Chen, W J

    1999-12-01

    Receptor-activity-modifying proteins (RAMPs) are a family of single transmembrane domain proteins shown to be important for the transport and ligand specificity of the calcitonin gene-related peptide (CGRP) receptor. In this report, we describe the analysis of pharmacological properties of the human calcitonin receptor (hCTR) coexpressed with different RAMPs with the use of the Xenopus laevis melanophore expression system. We show that coexpression of RAMP3 with human calcitonin receptor changed the relative potency of hCTR to human calcitonin (hCAL) and rat amylin. RAMP1 and RAMP2, in contrast, had little effect on the change of hCTR potency to hCAL or rat amylin. When coexpressed with RAMP3, hCTR reversed the relative potency by a 3.5-fold loss in sensitivity to hCAL and a 19-fold increase in sensitivity to rat amylin. AC66, an inverse agonist, produced apparent simple competitive antagonism of hCAL and rat amylin, as indicated by linear Schild regressions. The potency of AC66 was changed in the blockade of rat amylin but not hCAL responses with RAMP3 coexpression. The mean pK(B) for AC66 to hCAL was 9.4 +/- 0.3 without RAMP3 and 9.45 +/- 0.07 with RAMP3. For the antagonism of AC66 to rat amylin, the pK(B) was 9.25 +/- 0.15 without RAMP3 and 8.2 +/- 0.35 with RAMP3. The finding suggests that RAMP3 might modify the active states of calcitonin receptor in such a way as to create a new receptor phenotype that is "amylin-like." Irrespective of the physiological association of the new receptor species, the finding that a coexpressed membrane protein can completely change agonist and antagonist affinities for a receptor raises implications for screening in recombinant receptor systems.

  12. Numerical Study of Quench Protection for Fast-Ramping Accelerator Magnets

    OpenAIRE

    Schwerg, N; Auchman, B; Mess, K-N; Russenschuck, S

    2009-01-01

    The quench module of the ROXIE field computation program has been presented at previous conferences. In this paper we discuss recently implemented features that allow quench simulation of fast-ramping superconducting magnets. As the reliability of quench detection during the ramps depends on the signal to noise ratio, we simulate the influence of detection thresholds and the propagation of undetected quenches during the ramps. We also study the effect of an increased copper content and the fe...

  13. Dynamic Ramping Model Including Intraperiod Ramp-Rate Changes in Unit Commitment

    NARCIS (Netherlands)

    Correa-Posada, Carlos M.; Morales Espana, G.; Martinez, P. Dueñas; Sánchez-Martín, Pedro

    2017-01-01

    The growing increase of renewable generation worldwide is posing new challenges for a secure, reliable and economic operation of power systems. In order to face the uncertain and intermittent production of renewable sources, operating reserves must be allocated efficiently and accurately. Nowadays,

  14. Space shuttle with common fuel tank for liquid rocket booster and main engines (supertanker space shuttle)

    Science.gov (United States)

    Thorpe, Douglas G.

    1991-01-01

    An operation and schedule enhancement is shown that replaces the four-body cluster (Space Shuttle Orbiter (SSO), external tank, and two solid rocket boosters) with a simpler two-body cluster (SSO and liquid rocket booster/external tank). At staging velocity, the booster unit (liquid-fueled booster engines and vehicle support structure) is jettisoned while the remaining SSO and supertank continues on to orbit. The simpler two-bodied cluster reduces the processing and stack time until SSO mate from 57 days (for the solid rocket booster) to 20 days (for the liquid rocket booster). The areas in which liquid booster systems are superior to solid rocket boosters are discussed. Alternative and future generation vehicles are reviewed to reveal greater performance and operations enhancements with more modifications to the current methods of propulsion design philosophy, e.g., combined cycle engines, and concentric propellant tanks.

  15. Liquid Rocket Booster (LRB) for the Space Transportation System (STS) Systems Study; Volume 1 - Executive Summary

    National Research Council Canada - National Science Library

    Ware, Larry

    1989-01-01

    ...) solid rocket boosters (SRBs) with liquid rocket boosters (LRBs), Figure 1.0-1. The main objectives of a LRB substitution for the SRB were increased STS safety and reliability and increased payload performance...

  16. Functional relevance of G-protein-coupled-receptor-associated proteins, exemplified by receptor-activity-modifying proteins (RAMPs).

    Science.gov (United States)

    Fischer, J A; Muff, R; Born, W

    2002-08-01

    The calcitonin (CT) receptor (CTR) and the CTR-like receptor (CRLR) are close relatives within the type II family of G-protein-coupled receptors, demonstrating sequence identity of 50%. Unlike the interaction between CT and CTR, receptors for the related hormones and neuropeptides amylin, CT-gene-related peptide (CGRP) and adrenomedullin (AM) require one of three accessory receptor-activity-modifying proteins (RAMPs) for ligand recognition. An amylin/CGRP receptor is revealed when CTR is co-expressed with RAMP1. When complexed with RAMP3, CTR interacts with amylin alone. CRLR, initially classed as an orphan receptor, is a CGRP receptor when co-expressed with RAMP1. The same receptor is specific for AM in the presence of RAMP2. Together with human RAMP3, CRLR defines an AM receptor, and with mouse RAMP3 it is a low-affinity CGRP/AM receptor. CTR-RAMP1, antagonized preferentially by salmon CT-(8-32) and not by CGRP-(8-37), and CRLR-RAMP1, antagonized by CGRP-(8-37), are two CGRP receptor isotypes. Thus amylin and CGRP interact specifically with heterodimeric complexes between CTR and RAMP1 or RAMP3, and CGRP and AM interact with complexes between CRLR and RAMP1, RAMP2 or RAMP3.

  17. Current ramp-up experiments in full current drive plasmas on TRIAM-1M

    International Nuclear Information System (INIS)

    Hanada, K.; Nakamura, K.; Hasegawa, M.

    2003-01-01

    Four types of plasma current ramp-up experiments were executed on TRIAM-1M in full lower hybrid current drive plasmas (LHCD: 8.2GHz, up to 0.4 MW, 8 x 2 grill antenna); 1) the current start up by the combination between electron cyclotron resonance heating (ECH: 170GHz, up to 0.2 MW, O-mode launching) and LHCD at the density of ∼2x10 19 m -3 at B t =6.7T, 2) the tail heating by the additional LHCD, 3) the bulk heating by ECH, 4) the spontaneous ramp up by the transition to enhanced current drive (ECD) mode. The time evolutions of plasma current during four types of ramp-up phase were investigated and an exponential type and a tangent-hyperbolic one were observed. The time evolutions of plasma current during the tail and the bulk heating show the exponential type except the tail heating with high n parallel and it has a tangent-hyperbolic one during the ECD mode and the current start-up. A simple model with two different time constants, which are a time defined by L/R, τ L/R , and a time caused by change of the effective refractive index along the magnetic field, τ, is proposed to explain two types of the time evolution of the plasma current. The estimated τ L/R is consistent with the calculated one from the plasma parameter. It is found that τ are less than τ L/R in the cases of the tail and the bulk heating, and comparable in the cases of the ECD mode, and more than τ L/R in the cases of the plasma start-up. This indicates that the value of the effective refractive index along the magnetic field, parallel >, develops during the ECD mode and the current start-up. The value of τ depends on the RF power. The estimated is close to the expected up-shifted n parallel due to the toroidal effect and the magnetic shear. (author)

  18. Numerical studies on the ramped density plasma lens

    International Nuclear Information System (INIS)

    Williams, R.L.; Katsouleas, T.

    1992-01-01

    We consider the so-called adiabatic plasma lens when the plasma density is ramped too quickly to be considered adiabatic. The lens length can be much shorter in such a case, but the final spot size is shown to be larger by a factor of √1+α 2 than for a slowly ramped plasma lens with the same initial and final density (where α=-β'/2 is proportional to the plasma density gradient). We find that the final spot size is the same whether or not the Courant-Snyder parameters of the beam (α and β) are matched to the lens. However, matched beams allow the plasma density to be lower while unmatched beams allow the lens to be shorter (for the same α and for the same final to initial plasma density ratio). Finally, we find that a smaller spot size can be obtained for a given lens length and density ratio by starting at smaller α and increasing α along the lens

  19. Modelling controlled VDE's and ramp-down scenarios in ITER

    Science.gov (United States)

    Lodestro, L. L.; Kolesnikov, R. A.; Meyer, W. H.; Pearlstein, L. D.; Humphreys, D. A.; Walker, M. L.

    2011-10-01

    Following the design reviews of recent years, the ITER poloidal-field coil-set design, including in-vessel coils (VS3), and the divertor configuration have settled down. The divertor and its material composition (the latter has not been finalized) affect the development of fiducial equilibria and scenarios together with the coils through constraints on strike-point locations and limits on the PF and control systems. Previously we have reported on our studies simulating controlled vertical events in ITER with the JCT 2001 controller to which we added a PID VS3 circuit. In this paper we report and compare controlled VDE results using an optimized integrated VS and shape controller in the updated configuration. We also present our recent simulations of alternate ramp-down scenarios, looking at the effects of ramp-down time and shape strategies, using these controllers. This work performed under the auspices of the U.S. Department of Energy by LLNL under Contract DE-AC52-07NA27344.

  20. 47 CFR 74.1290 - FM translator and booster station information available on the Internet.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false FM translator and booster station information... DISTRIBUTIONAL SERVICES FM Broadcast Translator Stations and FM Broadcast Booster Stations § 74.1290 FM translator and booster station information available on the Internet. The Media Bureau's Audio Division...

  1. Simulation of the capture process in the Fermilab Booster

    International Nuclear Information System (INIS)

    Stahl, S.; Ankenbrandt, C.

    1987-09-01

    A progress report on efforts to understand and improve adiabatic capture in the Fermilab Booster by experiment and simulation is presented. In particular, a new RF voltage program for capture which ameliorates transverse space-charge effects is described and simulated. 7 refs., 4 figs

  2. Simulation of proton RF capture in the AGS Booster

    International Nuclear Information System (INIS)

    Khiari, F.Z.; Luccio, A.U.; Weng, W.T.

    1988-01-01

    RF capture of the proton beam in the AGS Booster has been simulated with the longitudinal phase-space tracking code ESME. Results show that a capture in excess of 95% can be achieved with multiturn injection of a chopped beam

  3. Multipole stack for the 4 rings of the PS Booster

    CERN Multimedia

    CERN PhotoLab

    1976-01-01

    The PS Booster (originally 800 MeV, now 1.4 GeV) saw first beam in 1972, routine operation began in 1973. The strive for ever higher intensities required the addition of multipoles. Manufacture of 8 stacks of multipoles was launched in 1974, for installation in 1976. For details, see 7511120X.

  4. OPTIMAL SCHEDULING OF BOOSTER DISINFECTION IN WATER DISTRIBUTION SYSTEMS

    Science.gov (United States)

    Booster disinfection is the addition of disinfectant at locations distributed throughout a water distribution system. Such a strategy can reduce the mass of disinfectant required to maintain a detectable residual at points of consumption in the distribution system, which may lea...

  5. Booster HBV vaccination; is it really necessary? | Alavian | Egyptian ...

    African Journals Online (AJOL)

    Egyptian Journal of Pediatric Allergy and Immunology (The). Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 9, No 2 (2011) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Booster HBV vaccination; is it ...

  6. FNAL Booster intensity, extraction, and synchronization control for collider operation

    International Nuclear Information System (INIS)

    Ducar, R.J.; Lackey, J.R.; Tawzer, S.R.

    1987-03-01

    Booster operation for collider physics is considerably different than for fixed target operation. Various scenarios for collider physics, machine studies, and P-Bar targeting may require that the intensity vary from 5E10 PPP to 3E12 PPP at a 15 Hertz machine cycle rate. In addition to the normal Booster single turn extraction mode, collider operations require that the Booster inject into the Main Ring a small number of beam bunches for coalescing into a single high intensity bunch. These bunches must be synchronized such that the center bunch arrives in the RF bucket which corresponds to the zero phase of the coalescing cavity. The system implemented has the ability to deliver a precise fraction of the available 84 Booster beam bunches to Main Ring or to the P-Bar Debuncher via the newly installed AP-4 beam line for tune-up and studies. It is required that all of the various intensity and extraction scenarios be accommodated with minimal operator intervention

  7. Beam aperture and emittance growth in the AGS-Booster

    International Nuclear Information System (INIS)

    Parsa, Z.

    1987-01-01

    The authors have developed analytical tools for calculating the variation of particle action, smear and emittance growth due to nonlinear elements in accelerators (with second order perturbation theory in two dimensions). The authors' results for the AGS-Booster is presented

  8. Chromatic perturbation and resonance analysis for the AGS-Booster

    International Nuclear Information System (INIS)

    Parsa, Z.

    1987-01-01

    The authors investigated the nonlinear effects with the emphasis on nonlinear resonances. They present some of their findings, (e.g. the structure resonances; stop-bandwidths, etc.) for the AGS-Booster Lattice using program HARMON. Comparison with the results obtained from the algorithm ''NONLIN'' is presented

  9. Simulation of the capture process in the Fermilab Booster

    International Nuclear Information System (INIS)

    Stahl, S.; Ankenbrandt, C.

    1987-01-01

    A progress report on efforts to understand and improve adiabatic capture in the Fermilab Booster by experiment and simulation is presented. In particular, a new Rf voltage program for capture which ameliorates transverse space-charge effects is described and simulated

  10. Effect of trailing edge ramp on cavity flow structures and pressure drag

    International Nuclear Information System (INIS)

    Pey, Yin Yin; Chua, Leok Poh; Siauw, Wei Long

    2014-01-01

    Highlights: • Trailing edge ramps were used to reduce unsteadiness and pressure drag of a cavity. • Proper Orthogonal Decomposition was used to educe the coherent structures. • The 30° ramp was successful in redistributing the energy content within the cavity. • The 30° ramp guides the flow smoothly out of the cavity, reducing flow impingement. • A substantial reduction of pressure drag was achieved by the 30° ramp. -- Abstract: The effects of trailing edge ramp modifications on time-averaged velocity and pressure distributions within a cavity with a length to depth ratio of 2, at a speed of 15 m/s were investigated. The ramp angles were varied at 30°, 45° and 60° and ramp heights were varied at 0.25 times and 0.5 times of cavity depth. The mean flow within the cavity differed significantly from the baseline case when ramp angle was 30° and 45° with ramp height 0.5 times of cavity depth. At these 2 configurations, moment about the center of the cavity floor was reduced significantly. These could be attributed to the more steady flow within the cavity as compared to the baseline case. Spatial correlation of velocity in the cavity of ramp angle 30° showed that internal cavity flow was less sensitive to flow changes in the shear layer as compared to the baseline case. In the same cavity, snapshot Proper Orthogonal Decomposition revealed a redistribution of energy content where energetic structures exist only in the shear layer as opposed to energetic structures in both the shear layer and internal cavity for the baseline case. A reduction of pressure drag was also observed as the gentle ramp angle of 30° guides the flow smoothly out of the cavity and reduces trailing edge impingement

  11. Relationship between work rate and oxygen uptake in mitochondrial myopathy during ramp-incremental exercise

    Directory of Open Access Journals (Sweden)

    A.C. Gimenes

    2011-04-01

    Full Text Available We determined the response characteristics and functional correlates of the dynamic relationship between the rate (Δ of oxygen consumption ( O2 and the applied power output (work rate = WR during ramp-incremental exercise in patients with mitochondrial myopathy (MM. Fourteen patients (7 males, age 35.4 ± 10.8 years with biopsy-proven MM and 10 sedentary controls (6 males, age 29.0 ± 7.8 years took a ramp-incremental cycle ergometer test for the determination of the O2 on-exercise mean response time (MRT and the gas exchange threshold (GET. The ΔO2/ΔWR slope was calculated up to GET (S1, above GET (S2 and over the entire linear portion of the response (S T. Knee muscle endurance was measured by isokinetic dynamometry. As expected, peak O2 and muscle performance were lower in patients than controls (P O2/ΔWR than controls, especially the S2 component (6.8 ± 1.5 vs 10.3 ± 0.6 mL·min-1·W-1, respectively; P O2/ΔWR (S T and muscle endurance, MRT-O2, GET and peak O2 in MM patients (P O2/ΔWR below 8 mL·min-1·W-1 had severely reduced peak O2 values (O2 had lower ΔO2/ΔWR (P O2/ΔWR is typically reduced in patients with MM, being related to increased functional impairment and higher cardiopulmonary stress.

  12. Multiphysics modelling of the separation of suspended particles via frequency ramping of ultrasonic standing waves.

    Science.gov (United States)

    Trujillo, Francisco J; Eberhardt, Sebastian; Möller, Dirk; Dual, Jurg; Knoerzer, Kai

    2013-03-01

    A model was developed to determine the local changes of concentration of particles and the formations of bands induced by a standing acoustic wave field subjected to a sawtooth frequency ramping pattern. The mass transport equation was modified to incorporate the effect of acoustic forces on the concentration of particles. This was achieved by balancing the forces acting on particles. The frequency ramping was implemented as a parametric sweep for the time harmonic frequency response in time steps of 0.1s. The physics phenomena of piezoelectricity, acoustic fields and diffusion of particles were coupled and solved in COMSOL Multiphysics™ (COMSOL AB, Stockholm, Sweden) following a three step approach. The first step solves the governing partial differential equations describing the acoustic field by assuming that the pressure field achieves a pseudo steady state. In the second step, the acoustic radiation force is calculated from the pressure field. The final step allows calculating the locally changing concentration of particles as a function of time by solving the modified equation of particle transport. The diffusivity was calculated as function of concentration following the Garg and Ruthven equation which describes the steep increase of diffusivity when the concentration approaches saturation. However, it was found that this steep increase creates numerical instabilities at high voltages (in the piezoelectricity equations) and high initial particle concentration. The model was simplified to a pseudo one-dimensional case due to computation power limitations. The predicted particle distribution calculated with the model is in good agreement with the experimental data as it follows accurately the movement of the bands in the centre of the chamber. Crown Copyright © 2012. Published by Elsevier B.V. All rights reserved.

  13. Superconducting LINAC booster for the Mumbai pelletron

    Indian Academy of Sciences (India)

    relative to normal ones, a substantial reduction in electric power to maintain large electric fields can be ... Design and construction of a suitable cryogenic system. • Fabrication of ... The QWR is essentially an open-ended λ/4 coaxial transmission line capable of sup- ... helium, while the outer can is cooled by conduction.

  14. Harmonic Mitigation Using a Polarized Ramp-time Current-Controlled Inverter

    Directory of Open Access Journals (Sweden)

    Lawrence J. Borle

    2010-12-01

    Full Text Available This paper describes the implementation of a shunt active power filter for a three-phase four-wire system to compensate for power quality problems generated by mixed non-linear loads, which are a combination of harmonic, reactive and unbalanced components. The filter is a three-phase current-controlled voltage source inverter (CC-VSI with a filter inductor at the AC output and a DC-bus capacitor. The CC-VSI is operated to directly control the grid current to be sinusoidal and in phase with the grid voltage without sensing the load currents. The switching is controlled using polarized ramp-time current control, which is based on the concept of zero average current error (ZACE with a fixed switching frequency. The laboratory experiment results indicate that the filter is able to mitigate predominantly the harmonics, as well as the reactive power, so that the grid currents are sinusoidal, in phase with the grid voltages and symmetrical although the grid voltage contains harmonics.

  15. Quantification of tsunami-induced flows on a Mediterranean carbonate ramp reveals catastrophic evolution

    NARCIS (Netherlands)

    Slootman, A.; Cartigny, M.J.B.; Moscariello, A.; Chiaradia, M.; de Boer, P.L.

    2016-01-01

    Cool-water carbonates are the dominant limestones in the Mediterranean Basin since the Early Pliocene. Their deposition typically resulted in ramp morphologies due to high rates of resedimentation. Several such fossil carbonate ramps are characterised by a bimodal facies stacking pattern, where

  16. Modelling ramp-up curves to reflect learning: improving capacity planning in secondary pharmaceutical production

    DEFF Research Database (Denmark)

    Hansen, Klaus Reinholdt Nyhuus; Grunow, Martin

    2015-01-01

    availability at market launch is ensured. Our MILP model is applied to a real industry case study using three empirically observed ramp-up curves to demonstrate its value as decision support tool. We demonstrate the superiority of our volume-dependent method over the traditional time-dependent ramp......The experience gained during production ramp-up leads to an increase of the effective production capacity over time. However, full utilisation of production capacity is not always possible during ramp-up. In such cases, the experience gained and hence the available effective capacity...... are overestimated. We develop a new method, which captures ramp-up as a function of the cumulative production volume to better reflect the experience gained while producing the new product. The use of the more accurate and computationally effective approach is demonstrated for the case of secondary pharmaceutical...

  17. Optimization design of energy deposition on single expansion ramp nozzle

    Science.gov (United States)

    Ju, Shengjun; Yan, Chao; Wang, Xiaoyong; Qin, Yupei; Ye, Zhifei

    2017-11-01

    Optimization design has been widely used in the aerodynamic design process of scramjets. The single expansion ramp nozzle is an important component for scramjets to produces most of thrust force. A new concept of increasing the aerodynamics of the scramjet nozzle with energy deposition is presented. The essence of the method is to create a heated region in the inner flow field of the scramjet nozzle. In the current study, the two-dimensional coupled implicit compressible Reynolds Averaged Navier-Stokes and Menter's shear stress transport turbulence model have been applied to numerically simulate the flow fields of the single expansion ramp nozzle with and without energy deposition. The numerical results show that the proposal of energy deposition can be an effective method to increase force characteristics of the scramjet nozzle, the thrust coefficient CT increase by 6.94% and lift coefficient CN decrease by 26.89%. Further, the non-dominated sorting genetic algorithm coupled with the Radial Basis Function neural network surrogate model has been employed to determine optimum location and density of the energy deposition. The thrust coefficient CT and lift coefficient CN are selected as objective functions, and the sampling points are obtained numerically by using a Latin hypercube design method. The optimized thrust coefficient CT further increase by 1.94%, meanwhile, the optimized lift coefficient CN further decrease by 15.02% respectively. At the same time, the optimized performances are in good and reasonable agreement with the numerical predictions. The findings suggest that scramjet nozzle design and performance can benefit from the application of energy deposition.

  18. OXYGEN UPTAKE KINETICS DURING INCREMENTAL- AND DECREMENTAL-RAMP CYCLE ERGOMETRY

    Directory of Open Access Journals (Sweden)

    Fadıl Özyener

    2011-09-01

    Full Text Available The pulmonary oxygen uptake (VO2 response to incremental-ramp cycle ergometry typically demonstrates lagged-linear first-order kinetics with a slope of ~10-11 ml·min-1·W-1, both above and below the lactate threshold (ӨL, i.e. there is no discernible VO2 slow component (or "excess" VO2 above ӨL. We were interested in determining whether a reverse ramp profile would yield the same response dynamics. Ten healthy males performed a maximum incremental -ramp (15-30 W·min-1, depending on fitness. On another day, the work rate (WR was increased abruptly to the incremental maximum and then decremented at the same rate of 15-30 W.min-1 (step-decremental ramp. Five subjects also performed a sub-maximal ramp-decremental test from 90% of ӨL. VO2 was determined breath-by-breath from continuous monitoring of respired volumes (turbine and gas concentrations (mass spectrometer. The incremental-ramp VO2-WR slope was 10.3 ± 0.7 ml·min-1·W-1, whereas that of the descending limb of the decremental ramp was 14.2 ± 1.1 ml·min-1·W-1 (p < 0.005. The sub-maximal decremental-ramp slope, however, was only 9. 8 ± 0.9 ml·min-1·W-1: not significantly different from that of the incremental-ramp. This suggests that the VO2 response in the supra-ӨL domain of incremental-ramp exercise manifest not actual, but pseudo, first-order kinetics

  19. Ramp-related incidents involving wheeled mobility device users during transit bus boarding/alighting.

    Science.gov (United States)

    Frost, Karen L; Bertocci, Gina; Smalley, Craig

    2015-05-01

    To estimate the prevalence of wheeled mobility device (WhMD) ramp-related incidents while boarding/alighting a public transit bus and to determine whether the frequency of incidents is less when the ramp slope meets the proposed Americans with Disabilities Act (ADA) maximum allowable limit of ≤9.5°. Observational study. Community public transportation. WhMD users (N=414) accessing a public transit bus equipped with an instrumented ramp. Not applicable. Prevalence of boarding/alighting incidents involving WhMD users and associated ramp slopes; factors affecting incidents. A total of 4.6% (n=35) of WhMD users experienced an incident while boarding/alighting a transit bus. Significantly more incidents occurred during boarding (6.3%, n=26) than during alighting (2.2%, n=9) (Pboard/alight when the ramp slope exceeded the proposed ADA maximum allowable ramp slope was 5.1 (95% confidence interval, 2.9-9.0; P9.5° and ramps deployed to street level are associated with a higher frequency of incidents and provision of assistance. Transit agencies should increase awareness among bus operators of the effect kneeling and deployment location (street/sidewalk) have on the ramp slope. In addition, ramp components and the built environment may contribute to incidents. When prescribing WhMDs, skills training must include ascending/descending ramps at slopes encountered during boarding/alighting to ensure safe and independent access to public transit buses. Copyright © 2015 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  20. β-distribution for Reynolds stress and turbulent heat flux in relaxation turbulent boundary layer of compression ramp

    Science.gov (United States)

    Hu, YanChao; Bi, WeiTao; Li, ShiYao; She, ZhenSu

    2017-12-01

    A challenge in the study of turbulent boundary layers (TBLs) is to understand the non-equilibrium relaxation process after sep-aration and reattachment due to shock-wave/boundary-layer interaction. The classical boundary layer theory cannot deal with the strong adverse pressure gradient, and hence, the computational modeling of this process remains inaccurate. Here, we report the direct numerical simulation results of the relaxation TBL behind a compression ramp, which reveal the presence of intense large-scale eddies, with significantly enhanced Reynolds stress and turbulent heat flux. A crucial finding is that the wall-normal profiles of the excess Reynolds stress and turbulent heat flux obey a β-distribution, which is a product of two power laws with respect to the wall-normal distances from the wall and from the boundary layer edge. In addition, the streamwise decays of the excess Reynolds stress and turbulent heat flux also exhibit power laws with respect to the streamwise distance from the corner of the compression ramp. These results suggest that the relaxation TBL obeys the dilation symmetry, which is a specific form of self-organization in this complex non-equilibrium flow. The β-distribution yields important hints for the development of a turbulence model.

  1. Improving the performance of booster heat pumps using zeotropic mixtures

    DEFF Research Database (Denmark)

    Zühlsdorf, B.; Meesenburg, W.; Ommen, T. S.

    2018-01-01

    Abstract This study demonstrated an increase in the thermodynamic performance of a booster heat pump, which was achieved by choosing the working fluid among pure and mixed fluids. The booster heat pump was integrated in an ultra-low-temperature district heating network with a forward temperature...... of 40 °C to produce domestic hot water, by heating part of the forward stream to 60 °C, while cooling the remaining part to the return temperature of 25 °C. The screening of working fluids considered 18 pure working fluids and all possible binary mixtures of these fluids. The most promising solutions...... heat supply system while being economically competitive to pure fluids....

  2. Frequency control of RF booster cavity in TRIUMF

    International Nuclear Information System (INIS)

    Fong, K.; Laverty, M.

    1993-01-01

    A booster is used in the TRIUMF cyclotron to increase the energy gain per turn for beam orbits corresponding to energies greater than 370 MeV. It operates at 92.24 MHz, the 4 th harmonic of the cyclotron main rf, and at a nominal voltage of 150 kV. Excitation is provided by a 90 kW rf system that is phase locked to the main rf. When the main rf is interrupted due to sparking or other causes, a controller built into the low frequency source of the booster rf system disables the phase-locked loop, and reconfigures the source as a temperature stabilized oscillator operating at the last locked frequency. When the cyclotron rf is restored it usually will be at different frequency. The oscillator tunes automatically to this new frequency. The acquisition time is extended by the controller to match the response time of the mechanical tuner in the cavity

  3. Injection system of teh SSC Medium Energy Booster

    International Nuclear Information System (INIS)

    Mao, N.; Gerig, R.; McGill, J.; Brown, K.

    1994-04-01

    The Medium Energy Booster (MEB) is the third of the SSCL accelerators and the largest of the resistive magnet synchrotrons. It accelerates protons from an injection momentum of 12 GeV/c to a top momentum of 200 GeV/c. A beam injection system has been designed to inject the beam transferred from the Low Energy Booster onto the MEB closed orbit in the MEB injection insertion region. The beam is injected via a vertical bending Lambertson septum magnet and a horizontal kicker with appropriate matching and very little beam loss and emittance dilution. The beam optics of the injection system is described in this paper. The required parameters of the Lambertson septum magnet and the injection kicker are given

  4. Non-inductive plasma initiation and plasma current ramp-up on the TST-2 spherical tokamak

    International Nuclear Information System (INIS)

    Takase, Y.; Ejiri, A.; Oosako, T.; Shinya, T.; Ambo, T.; Furui, H.; Kato, K.; Nakanishi, A.; Sakamoto, T.; Kakuda, H.; Wakatsuki, T.; Hashimoto, T.; Hiratsuka, J.; Kasahara, H.; Kumazawa, R.; Mutoh, T.; Saito, K.; Seki, T.; Moeller, C.P.; Nagashima, Y.

    2013-01-01

    Plasma current (I p ) start-up in a spherical tokamak (ST) by waves in the lower-hybrid (LH) frequency range was investigated on TST-2. A low current (∼1 kA) ST configuration can be formed by waves over a broad frequency range (21 MHz–8.2 GHz in TST-2), but further I p ramp-up (to ∼10 kA) is most efficient with waves in the LH frequency range. I p ramp-up to 15 kA was achieved with 60 kW of net RF power P RF in the fast wave (FW) polarization at 200 MHz excited by the inductively coupled combline antenna. X-ray measurements showed that the photon flux and temperature are higher in the direction opposite to I p , consistent with acceleration of electrons by a uni-directional RF wave. There is evidence that the LH wave is excited nonlinearly by the FW, based on the frequency spectra measured by magnetic probes. Similar efficiencies of I p ramp-up were obtained with the inductive combline antenna and the dielectric-loaded waveguide array (‘grill’) antenna, and tendencies for the current drive efficiency to increase with plasma current and toroidal field were observed. During operation of the grill antenna, wavevector components were measured by an array of magnetic probes. Results were qualitatively consistent with expectations based on dispersion relations for the FW and the LH wave. A capacitively coupled combline antenna has been developed to improve coupling to the plasma and the wavenumber spectrum of the excited LH wave, and will be tested in 2013. (paper)

  5. RF field control for Kaon Factory booster cavities

    International Nuclear Information System (INIS)

    Craig, S.T.; de Jong, M.S.

    1992-08-01

    A conceptual design is developed for control of the Kaon Factory booster rf accelerating fields. This design addresses control of cavity: tuning, voltage amplitude, and voltage phase angle. Time-domain simulations were developed to evaluate the proposed controllers. These simulations indicate that adequate tuning performance can be obtained with the combination of adaptive feed forward and proportional feedback control. Voltage amplitude and voltage phase can be adequately controlled using non-adaptive feed forward and proportional feedback control. (Author) (figs., tabs.)

  6. RF field control for KAON Factory booster cavities

    International Nuclear Information System (INIS)

    Craig, S.T.; de Jong, M.S.

    1990-11-01

    A conceptual design is developed for control of the KAON Factory Booster rf accelerating fields. This design addresses control of cavity: tuning, voltage amplitude, and voltage phase angle. Time-domain simulations were developed to evaluated the proposed controllers. These simulations indicated that adequate tuning performance can be obtained with the combination of adaptive feed-forward and proportional feedback control. Voltage amplitude and voltage phase can be adequately controlled using non-adaptive feedforward and proportional feedback control

  7. Design of the AGS Booster beam position monitor system

    International Nuclear Information System (INIS)

    Beadle, E.; Brennan, J.M.; Ciardullo, D.J.; Savino, J.; Stanziani, V.; Thomas, R.; Van Zwienen, W.; Witkover, R.L.; Schulte, E.

    1989-01-01

    The AGS Booster beam position monitor system must cover a wide range of beam intensity and bunch length for proton and heavy ion acceleration. The detector is designed to maintain 0.1 mm local tolerance following 300 degree C bakeout. The electronics will be located in the tunnel, communicating via fiber optic links to avoid ground loops. The design will be described and test results for prototype units presented. 5 refs., 4 figs

  8. Construction and early commissioning results of the AGS Booster

    International Nuclear Information System (INIS)

    Weng, W.T.; Ahrens, L.; Damm, R.; McNerney, A.J.

    1991-01-01

    The AGS Booster synchrotron has been designed to accelerate protons from 200 MeV to 1.5 GeV and heavy ions from several MeV per nucleon to several hundred MeV per nucleon for all the nuclei up to gold. The design requirements and measurements results of major accelerator components and systems are presented. The early commissioning results of the injection is also presented. 12 refs., 9 figs., 2 tabs

  9. Study of an energy upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M E; Bartmann, W; Bartolome, S; Bertone, C; Blas, A; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Dahlen, P; Dobers, T; Findlay, A; Folch, R; Gilbert, N; Hansen, J; Hermanns, T; Jensen, S; Le Roux, P; Lopez-Hernandez, L A; Mahner, E; Masi, A; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Nonis, M; Olek, S; Paoluzzi, M; Pittet, S; Puccio, B; Raginel, V; Ruehl, I; Tan, J; Todd, B; Weterings, W; Widorski, W

    2011-01-01

    CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading for increased luminosity in the coming years. In order to overcome bottlenecks in the injector chain, an increase of the beam transfer energy from the CERN Proton Synchrotron Booster (PSB) to the Proton Synchrotron (PS) has been investigated as a possible upgrade scenario. This paper gives an overview of the technical solutions and summarizes the conclusions of the feasibility study.

  10. A Linac afterburner to supercharge the Fermilab booster

    International Nuclear Information System (INIS)

    Ankenbrandt M, Charles email = popovic@fnal.gov

    2002-01-01

    A Linac Afterburner is proposed to raise the energy of the beam injected into the Femrilab Booster from 400 MeV to about 600 MeV, thereby alleviating the longitudinal and transverse space-charge effects at low energy that currently limit its performance. The primary motivation is to increase the integrated luminosity of the Tevatron Collider in Run II, but other future programs would also recap substantial benefits. The estimated cost is $23M

  11. A tool for model based diagnostics of the AGS Booster

    International Nuclear Information System (INIS)

    Luccio, A.

    1993-01-01

    A model-based algorithmic tool was developed to search for lattice errors by a systematic analysis of orbit data in the AGS Booster synchrotron. The algorithm employs transfer matrices calculated with MAD between points in the ring. Iterative model fitting of the data allows one to find and eventually correct magnet displacements and angles or field errors. The tool, implemented on a HP-Apollo workstation system, has proved very general and of immediate physical interpretation

  12. Reusable Boosters in a European-Russian Perspective

    Science.gov (United States)

    Deneu, François; Ramiandrasoa, Fabienne

    2002-01-01

    In 2001, EADS and Khrunichev SRPSC have initiated and carried out a working group devoted to the analysis of potential common studies and developments in the field of space activities. This working group came up with several propositions of interest, among which, the use of reusable boosters issued from Khrunichev previous design appeared to be promising when applied to heavy type launchers. Although the results required to be confirmed by detailed studies prior to final conclusions, preliminary studies have shown the interest of Ariane 5 configurations using such reusable booster in view of reducing the specific and launch cost as well as potentially increasing the performance. In November 2001, EADS and KHRUNICHEV SRPSC have started a study on an Ariane 5 plus reusable boosters configuration. This study aims at obtaining a better understanding of the advantages and drawbacks attached to such a use. Technical feasibility is more in depth analysed, with all recurring and not recurring aspects (including launch infrastructure modifications). Programmatic aspects are also addressed in order to better assess potential economic advantages and unavoidable drawbacks. Beyond that the identification of what could be, for western Europe and Russian players, an efficient and pay- off industrial organisation, is also a study theme of importance. This papers intends to present the main results achieved within this study and the propositions for the future which are likely to provide western Europe and Russia with stronger positions in the competitive field of launch business.

  13. JAERI tandem-accelerator and tandem-booster

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, Tadashi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-03-01

    In 1982, aiming at the new development of atomic energy research, the tandem accelerator of Japan Atomic Energy Research Institute (JAERI) was installed. In fiscal year 1993, the superconducting boosters which can increase the ion energy by up to 4 times were added, and the research in the region below 1000 MeV became possible. Those are electrostatic type accelerators which are easy to be used especially in basic research field, and are useful for future research. The tandem accelerator has been operated while maintaining the first class performance as the accelerator for various kinds of heavy ion beam. It has the special shape among electrostatic type accelerators, and is excellent in the easiness of control and stability. The main particulars of the tandem accelerator are shown. As for the ion sources of the tandem accelerator, three cesium sputter type ion sources are installed on two high voltage stands. The kinds of the ions which can be accelerated are mainly negative ions. As the improvement, electron cyclotron resonance (ECR) ion sources are expected to be adopted. As for the tandem boosters, the 1/4 wavelength type resonance hollow cylinder was adopted. The constitution of the tandem boosters is explained. The way of utilizing the tandem accelerator system and the aim for hereafter are reported. (K.I.)

  14. Development of synchronized control method for shaking table with booster device. Verification of the capabilities based on both real facility and numerical simulator

    International Nuclear Information System (INIS)

    Kajii, Shin-ichirou; Yasuda, Chiaki; Yamashita, Toshio; Abe, Hiroshi; Kanki, Hiroshi

    2004-01-01

    In the seismic design of nuclear power plant, it is recently considered to use probability method in a addition to certainty method. The former method is called Seismic Probability Safety Assessment (Seismic PSA). In case of seismic PSA for some components of a nuclear power plant using a shaking table, it is necessary for some limited conditions with high level of accelerations such as actual conditions. However, it might be difficult to achieve the test conditions that a current shaking table based on hydraulic power system is intended for the test facility. Therefore, we have been planning out a test method in which both a current and another shaking table called a booster device are applied. This paper describes the verification test of a synchronized control between a current shaking table and a booster device. (author)

  15. Study on wake structure characteristics of a slotted micro-ramp with large-eddy simulation

    Energy Technology Data Exchange (ETDEWEB)

    Dong, Xiangrui; Chen, Yaohui; Dong, Gang; Liu, Yixin, E-mail: cyh873@163.com [National Key Laboratory of Transient Physics, Nanjing University of Science and Technology, Nanjing, 210094 (China)

    2017-06-15

    In this paper, a novel slotted ramp-type micro vortex generator (slotted micro-ramp) for flow separation control is simulated in the supersonic flow of Ma = 1.5, based on large eddy simulation combined with the finite volume method. The wake structure characteristics and control mechanisms of both slotted and standard micro-ramps are presented and discussed. The results show that the wake of standard micro-ramp includes a primary counter-rotating streamwise vortex pair, a train of vortex rings, and secondary vortices. The slotted micro-ramp has more complicated wake structures, which contain a confluent counter-rotating streamwise vortex pair and additional streamwise vortices, with the same rotation generated by slot and the vortex rings enveloping the vortex pair. The additional vortices generated by the slot of the micro-ramp can mix with the primary counter-rotating vortex pair, extend the life time, and strengthen the vortex intensity of primary vortex pair. Moreover, the slot can effectively alleviate, or even eliminate the backflow and decrease the profile drag induced by the standard micro-ramp, therefore improving the efficiency of separation control. (paper)

  16. Compatibility of booster seats and vehicles in the U.S. market.

    Science.gov (United States)

    Bing, Julie A; Agnew, Amanda M; Bolte, John H

    2018-05-19

    The objective of this study was to analyze booster and rear vehicle seat dimensions to identify the most frequent compatibility problems. Measurements were collected from 40 high-back and backless boosters and 95 left rear and center rear row seating positions in 50 modern vehicles. Dimensions were compared for 3,800 booster/vehicle seat combinations. For validation and estimation of tolerance and correction factors, 72 booster installations were physically completed and compared with measurement-based compatibility predictions. Dimensions were also compared to the International Organization for Standardization (ISO) volumetric envelopes of forward-facing child restraints and boosters. Seat belt buckles in outboard positions accommodated the width of boosters better than center positions (success rates of 85.4 and 34.7%, respectively). Adequate head restraint clearance occurred in 71.9 to 77.2% of combinations, depending on the booster's head support setting. Booster recline angles aligned properly with vehicle seat cushion angles in 71.5% of combinations. In cases of poor angle alignment, booster angles were more obtuse than the vehicle seat angles 97.7% of the time. Head restraint interference exacerbated angle alignment issues. Data indicate success rates above 90% for boosters being fully supported by the length of the seat cushion and for adequate height clearance with the vehicle roofline. Comparison to ISO envelopes indicates that most boosters on the U.S. market are taller and angled more obtusely than ISO target envelopes. This study quantifies some of the common interferences between boosters and vehicles that may complicate booster usage. Data are useful for design and to prioritize specific problem areas.

  17. A real-time crash prediction model for the ramp vicinities of urban expressways

    Directory of Open Access Journals (Sweden)

    Moinul Hossain

    2013-07-01

    Full Text Available Ramp vicinities are arguably the known black-spots on urban expressways. There, while maintaining high speed, drivers need to respond to several complex events such as maneuvering, reading road signs, route planning and maintaining safe distance from other maneuvering vehicles simultaneously which demand higher level of cognitive response to ensure safety. Therefore, any additional discomfort caused by traffic dynamics may induce driving error resulting in a crash. This manuscript presents a methodology for identifying these dynamically forming hazardous traffic conditions near the ramp vicinities with high resolution real-time traffic flow data. It separates the ramp vicinities into four zones – upstream and downstream of entrance and exit ramps, and builds four separate real-time crash prediction models. Around two year (December 2007 to October 2009 crash data as well as their matching traffic sensor data from Shibuya 3 and Shinjuku 4 expressways under the jurisdiction of Tokyo Metropolitan Expressway Company Limited have been utilized for this research. Random multinomial logit, a forest of multinomial logit models, has been used to identify the most important variables. Finally, a real-time modeling method, Bayesian belief net (BBN, has been employed to build the four models using ramp flow, flow and congestion index in the upstream and flow and speed in the downstream of the ramp location as variables. The newly proposed models could predict 50%, 42%, 43% and 55% of the future crashes with around 10% false alarm for the downstream of entrance, downstream of exit, upstream of entrance and upstream of exit ramps respectively. The models can be utilized in combination with various traffic smoothing measures such as ramp metering, variable speed limit, warning messages through variable message signs, etc. to enhance safety near the ramp vicinities.

  18. Deficiency of RAMP1 attenuates antigen-induced airway hyperresponsiveness in mice.

    Directory of Open Access Journals (Sweden)

    Manyu Li

    Full Text Available Asthma is a chronic inflammatory disease affecting the lung, characterized by breathing difficulty during an attack following exposure to an environmental trigger. Calcitonin gene-related peptide (CGRP is a neuropeptide that may have a pathological role in asthma. The CGRP receptor is comprised of two components, which include the G-protein coupled receptor, calcitonin receptor-like receptor (CLR, and receptor activity-modifying protein 1 (RAMP1. RAMPs, including RAMP1, mediate ligand specificity in addition to aiding in the localization of receptors to the cell surface. Since there has been some controversy regarding the effect of CGRP on asthma, we sought to determine the effect of CGRP signaling ablation in an animal model of asthma. Using gene-targeting techniques, we generated mice deficient for RAMP1 by excising exon 3. After determining that these mice are viable and overtly normal, we sensitized the animals to ovalbumin prior to assessing airway resistance and inflammation after methacholine challenge. We found that mice lacking RAMP1 had reduced airway resistance and inflammation compared to wildtype animals. Additionally, we found that a 50% reduction of CLR, the G-protein receptor component of the CGRP receptor, also ameliorated airway resistance and inflammation in this model of allergic asthma. Interestingly, the loss of CLR from the smooth muscle cells did not alter the airway resistance, indicating that CGRP does not act directly on the smooth muscle cells to drive airway hyperresponsiveness. Together, these data indicate that signaling through RAMP1 and CLR plays a role in mediating asthma pathology. Since RAMP1 and CLR interact to form a receptor for CGRP, our data indicate that aberrant CGRP signaling, perhaps on lung endothelial and inflammatory cells, contributes to asthma pathophysiology. Finally, since RAMP-receptor interfaces are pharmacologically tractable, it may be possible to develop compounds targeting the RAMP1/CLR

  19. A Project Of The 2.5 Gev Booster-synchrotron In Binp

    CERN Document Server

    Barbashin, V M; Kremyanskaya, E V; Kvardakov, V A; Levichev, E B; Mishnev, S I; Skrinsky, A N; Smaluk, V V

    2004-01-01

    A project of the 2.5 GeV booster synchrotron to provide effective injection of electron and positron beams into VEPP-2000 and VEPP-4M storage rings, and for future facilities, is developing in BINP. The beams are injected to synchrotron at 510 MeV energy from a damping ring, which is the part of the new injection facility [1]. Small transverse size of the beam extracted from the damping ring allows us to design the synchrotron with rather small acceptance. Therefore, the aperture can be reduced essentially, which also decreases dimensions of the magnets and their power-consuming. In this report, the synchrotron parameters are presented, the basic systems are briefly described.

  20. Performance of a correlator filter in betatron tune measurements and damping on the NSLS booster

    International Nuclear Information System (INIS)

    Galayda, J.

    1985-01-01

    A ''compensated correlator filter'', described by Kramer, et al. has been used for measurement and damping of betatron oscillations in the NSLS booster. The filter consists of a zero-degree power splitter, a 180-degree splitter, a length of 7/8'' air dielectric coaxial cable, and a short length of RG-58 cable. Connected to a beam position monitor, the output of the filter is proportional to the difference in transverse position of each bunch on subsequent turns. The useful bandwidth of the filter for damping rigid bunch oscillations extends from 10 MHz to 250 MHz, in contrast with the gigahertz bandwidth requirements for stochastic cooling, for which the filter was originally proposed. Attenuation of all rotation harmonics in this bandwidth is 40 to 60 dB

  1. An ep collider with Ecm = 1 TeV in a VLHC booster tunnel

    International Nuclear Information System (INIS)

    Barber, D. P.; Chojnacki, E.; Derrick, M.; Friedsam, H.; Gorski, A.; Hanuska, S.; Jagger, J.; Krakauer, D.; Norem, J.; Rotela, E.; Sen, T.; Sharma, S.; Teng, L.; Thompson, K.

    1999-01-01

    The low field option for the VLHC includes a 3 TeV proton booster with a circumference of 34 km. The authors are studying the option of an electron ring to fit in this tunnel which can produce ep collisions with a luminosity of 1 fb -1 /yr with a center of mass energy of 1 TeV. The machine would utilize superconducting rf and small low field magnets for the approximately 80 GeV electron beam. They describe the vacuum chamber/magnet system, rf power supply requirements, vacuum chamber cooling, interaction regions and installation of the facility in the tunnel, as well as provide preliminary estimates of beam stability and lifetimes

  2. Structural studies of YBCO ramp Josephson junctions for rapid single flux quantum circuits

    Energy Technology Data Exchange (ETDEWEB)

    Gustafsson, M.; Olsson, E.; Huang, M.Q.; Komissinski, P.V.; Mozhaev, P.B.; Ivanov, Z.G.

    1999-11-01

    Ramp-type Josephson junctions with barrier layers of Ga doped PrBa{sub 2}Cu{sub 3}O{sub 7{minus}{delta}} have been investigated using scanning and transmission electron microscopy. The microstructures have been correlated to the ramp geometry. The junctions exhibited low excess current. This is believed to be due to the uniform thickness of barrier layer deposited on the ion-milled edges. The uniformity of the barrier is presumed to be a result of the smooth ramp, which promoted uniform nucleation and epitaxial growth.

  3. Emittance Growth due to Crab Cavity Ramping for LHC Beam-1 Lattice

    CERN Document Server

    Morita, A

    2008-01-01

    In LHC upgrade scenarios using global crab crossing, it is desired to turn on the crab cavity only at top energy. Turning on the crab cavity could increase the emittance of the stored beam, since the transverse kick of the crab cavity excites betatron oscillations. For a sufficiently slow ramping speed of the crab cavity voltage, however, the changes in z-dependent closed orbit are sufficiently adiabatic that the emittance growth becomes negligible. In order to determine the safe ramping speed of the LHC crab-cavity voltage, the dependence of the emittance growth on the ramping speed is estimated via a 6D particle-tracking simulation.

  4. Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-10-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP). (author)

  5. The Nucleation and Propagation of Thrust Ramps: Insights from Quantitative Analysis of Frictional Analog (Sandbox) Models

    Science.gov (United States)

    Sen, P.; Haq, S. S.; Marshak, S.

    2012-12-01

    Particle Imaging Velocimetry (PIV) provides a unique opportunity to analyze deformation in sandbox analog models at a scale that allows documentation of movement within and around individual shear structures. We employed PIV analysis to quantify deformation in sandbox experiments designed to simulate the initiation of thrust ramps developed during crustal shortening (i.e., contractional deformation). Our intent was to answer a long-standing question: Do ramps initiate at the tip of a detachment, or do they initiate in the interior of a deforming layer and propagate up-dip and down-dip until they link to the detachment at a location to the hinterland of the detachment's tip line? Most geometric studies of ramp-flat geometries in fold-thrust belts assume that ramps propagate up-dip from the tip of the detachment, and grow only in one direction. Field studies, in contrast, reveal that layer-parallel shortening structures develop to the foreland of the last ramp to form, suggesting that ramps initiate in a thrust sheet that has already undergone displacement above a detachment. Published sandbox models, using color-sand marker layers, support this idea. To test this idea further, we set up a model using a 3 m-long by 0.31-m wide glass-walled sandbox with a rigid backstop. The sand layer was sifted onto a sheet of mylar that could be pulled beneath the rigid backstop. Sand used in our experiments consisted of <250 μm-diameter grains. We carried out multiple runs using 4 cm, 5 cm and 6 cm-thick layers. Images were acquired over 1 mm displacement intervals using an 18 mega-pixel camera. By moving the camera at specific steps during the experiment, we sampled the development of several thrust ramps. The images taken during experimental runs were analyzed with a MATLAB-based program called 'PIV LAB' that utilizes an image cross-correlation subroutine to determine displacement fields of the sand particles. Our results demonstrate that: (1) thrust ramps initiate within the

  6. Bayesian model calibration of ramp compression experiments on Z

    Science.gov (United States)

    Brown, Justin; Hund, Lauren

    2017-06-01

    Bayesian model calibration (BMC) is a statistical framework to estimate inputs for a computational model in the presence of multiple uncertainties, making it well suited to dynamic experiments which must be coupled with numerical simulations to interpret the results. Often, dynamic experiments are diagnosed using velocimetry and this output can be modeled using a hydrocode. Several calibration issues unique to this type of scenario including the functional nature of the output, uncertainty of nuisance parameters within the simulation, and model discrepancy identifiability are addressed, and a novel BMC process is proposed. As a proof of concept, we examine experiments conducted on Sandia National Laboratories' Z-machine which ramp compressed tantalum to peak stresses of 250 GPa. The proposed BMC framework is used to calibrate the cold curve of Ta (with uncertainty), and we conclude that the procedure results in simple, fast, and valid inferences. Sandia National Laboratories is a multi-mission laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  7. LHC Report: intensity ramp-up – familiar demons

    CERN Multimedia

    Mike Lamont for the LHC team

    2015-01-01

    The first 2015 scrubbing run ended on Friday, 3 July and successfully delivered a well-scrubbed machine ready for operation with a 50 ns beam. This opened the way for the first phase of the so-called beam intensity ramp-up. The last couple of weeks have seen the number of bunches increase from 3 to 476 per beam via periods of 50, 144 and 300 bunches per beam.   The graph plots the rate of LHC beam dumps due to single-event effects (SEE) versus beam luminosity. It is an indication of the importance of tackling this issue.   To verify the full and proper functioning of all systems, operators need at least 3 fills and 20 hours of stable beams without significant problems. After 20 hours, an extensive checklist is signed off by the system experts before the next step up in the number of bunches. The systems involved include magnet protection, radio-frequency, beam instrumentation, collimation, operations, feedback, beam dump and injection. Increasing the total beam intensity poses a numb...

  8. The operational status of the Booster injector for the AGS accelerator complex at BNL

    International Nuclear Information System (INIS)

    Ahrens, L.; Bleser, E.; Brennan, J.M.; Gardner, C.; Gill, E.; Glenn, J.W.; Reece, K.; Roser, T.; van Asselt, W.; Weng, W.T.

    1992-01-01

    The Booster synchrotron at Brookhaven National Laboratory has been incorporated into the accelerator chain at the Alternating Gradient Synchrotron (AGS) complex. After a successful first commissioning effort in the spring of 1991, the Booster has been part of this year's silicon, gold and proton physics runs. After a brief review of the Booster design goals, and of the early commissioning, this paper will summarize this year's activities

  9. Wind power forecast

    Energy Technology Data Exchange (ETDEWEB)

    Pestana, Rui [Rede Electrica Nacional (REN), S.A., Lisboa (Portugal). Dept. Systems and Development System Operator; Trancoso, Ana Rosa; Delgado Domingos, Jose [Univ. Tecnica de Lisboa (Portugal). Seccao de Ambiente e Energia

    2012-07-01

    Accurate wind power forecast are needed to reduce integration costs in the electric grid caused by wind inherent variability. Currently, Portugal has a significant wind power penetration level and consequently the need to have reliable wind power forecasts at different temporal scales, including localized events such as ramps. This paper provides an overview of the methodologies used by REN to forecast wind power at national level, based on statistical and probabilistic combinations of NWP and measured data with the aim of improving accuracy of pure NWP. Results show that significant improvement can be achieved with statistical combination with persistence in the short-term and with probabilistic combination in the medium-term. NWP are also able to detect ramp events with 3 day notice to the operational planning. (orig.)

  10. An innovational application of digital power supply controller on SSRF dynamic power supply

    International Nuclear Information System (INIS)

    Chen Huanguang; Li Rui; Guo Chunlong; Shen Tianjian; Li Deming

    2008-01-01

    Control structure of dynamic power supply using PSI controller in SLS and Diamond is introduced. For designing dynamic power supply using PSI controller in the booster of SSRF, an innovative application of PSI digital power supply controller has been developed. In the commissioning of SSRF, the dynamic power supplies performed perfectly. (authors)

  11. Power

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård; Fogsgaard, Morten

    2016-01-01

    and creativity suggests that when managers give people the opportunity to gain power and explicate that there is reason to be more creative, people will show a boost in creative behaviour. Moreover, this process works best in unstable power hierarchies, which implies that power is treated as a negotiable....... It is thus a central point that power is not necessarily something that breaks down and represses. On the contrary, an explicit focus on the dynamics of power in relation to creativity can be productive for the organisation. Our main focus is to elaborate the implications of this for practice and theory...

  12. Analysis of eddy currents in the walls of the ferrite tuned RF cavity for the TRIUMF Kaon factory booster synchrotron

    International Nuclear Information System (INIS)

    Enchevich, I.B.; Barnes, M.J.; Poirier, R.L.

    1991-05-01

    In the perpendicular biased ferrite tuned cavity of the proposed TRIUMF Kaon Factory Booster Synchrotron, magnetizing flux passes through the cavity walls. If special care is not taken to minimize eddy current loss in the walls, the dissipated power would be excessive and the magnetic fields set up by the eddy currents would disturb the magnetic field being applied. By electrically isolating the cooling structure from the cavity walls and introducing slots in the walls it is possible to bring to an acceptable level both the power loss and the maximal temperatures. Based on the measurements, an analytical model - essentially 3D - was derived and the eddy currents were predicted using the circuit analysis program PSpice. The calculated surface current and power distribution agree with measurements. PSpice can now be used to determine the effect of design changes on the eddy current and power distribution. (Author) 7 refs., 5 figs

  13. Tamping Ramping: Algorithmic, Implementational, and Computational Explanations of Phasic Dopamine Signals in the Accumbens.

    Directory of Open Access Journals (Sweden)

    Kevin Lloyd

    2015-12-01

    Full Text Available Substantial evidence suggests that the phasic activity of dopamine neurons represents reinforcement learning's temporal difference prediction error. However, recent reports of ramp-like increases in dopamine concentration in the striatum when animals are about to act, or are about to reach rewards, appear to pose a challenge to established thinking. This is because the implied activity is persistently predictable by preceding stimuli, and so cannot arise as this sort of prediction error. Here, we explore three possible accounts of such ramping signals: (a the resolution of uncertainty about the timing of action; (b the direct influence of dopamine over mechanisms associated with making choices; and (c a new model of discounted vigour. Collectively, these suggest that dopamine ramps may be explained, with only minor disturbance, by standard theoretical ideas, though urgent questions remain regarding their proximal cause. We suggest experimental approaches to disentangling which of the proposed mechanisms are responsible for dopamine ramps.

  14. First beam test of a combined ramp and squeeze at LHC

    CERN Document Server

    Wenninger, Jorg; Coello De Portugal - Martinez Vazquez, Jaime Maria; Gorzawski, Arkadiusz; Redaelli, Stefano; Schaumann, Michaela; Solfaroli Camillocci, Matteo; CERN. Geneva. ATS Department

    2015-01-01

    With increasing maturity of LHC operation it is possible to envisage more complex beam manipulations. At the same time operational efficiency receives increasing attention. So far ramping the beams to their target energy and squeezing the beams to smaller or higher beta are decoupled at the LHC. (De-)squeezing is always performed at the target energy, currently 6.5 TeV. Studies to combine the ramp and squeeze processes have been made for the LHC since 2011, but so far no experimental test with beam had ever performed. This note describes the first machine experiment with beam aiming at validating the combination of ramp and squeeze, the so-called combined ramp and squeeze (CRS).

  15. Advanced Modeling of Ramp Operations including Departure Status at Secondary Airports, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This project addresses three modeling elements relevant to NASA's IADS research and ATD-2 project, two related to ramp operations at primary airports and one related...

  16. Design for Fermilab main injector magnet ramps which account for hysteresis

    International Nuclear Information System (INIS)

    Brown, B.C.; Bhat, C.M.; Harding, D.J.; Martin, P.S.; Wu, G.

    1997-05-01

    Although the dominant fields in accelerator electromagnets are proportional to the excitation current, precise control of accelerator parameters requires a detailed understanding of the fields in Main Injector magnets including contribution from eddy currents, magnet saturation, and hysteresis. Operation for decelerating beam makes such considerations particularly significant. Analysis of magnet measurements and design of control system software is presented. Field saturation and its effects on low field hysteresis are accounted for in specifying the field ramps for dipole, quadrupole and sextupole magnets. Some simplifying assumptions are made which are accepted as limitations on the required ramp sequences. Specifications are provided for relating desired field ramps to required current ramps for the momentum, tune, and chromaticity control

  17. A Ramp Cosine Cepstrum Model for the Parameter Estimation of Autoregressive Systems at Low SNR

    Directory of Open Access Journals (Sweden)

    Zhu Wei-Ping

    2010-01-01

    Full Text Available A new cosine cepstrum model-based scheme is presented for the parameter estimation of a minimum-phase autoregressive (AR system under low levels of signal-to-noise ratio (SNR. A ramp cosine cepstrum (RCC model for the one-sided autocorrelation function (OSACF of an AR signal is first proposed by considering both white noise and periodic impulse-train excitations. Using the RCC model, a residue-based least-squares optimization technique that guarantees the stability of the system is then presented in order to estimate the AR parameters from noisy output observations. For the purpose of implementation, the discrete cosine transform, which can efficiently handle the phase unwrapping problem and offer computational advantages as compared to the discrete Fourier transform, is employed. From extensive experimentations on AR systems of different orders, it is shown that the proposed method is capable of estimating parameters accurately and consistently in comparison to some of the existing methods for the SNR levels as low as −5 dB. As a practical application of the proposed technique, simulation results are also provided for the identification of a human vocal tract system using noise-corrupted natural speech signals demonstrating a superior estimation performance in terms of the power spectral density of the synthesized speech signals.

  18. Key Performance Indicators for the Impact of Cognitive Assembly Planning on Ramp-Up Process

    OpenAIRE

    Buescher, Christian; Hauck, Eckart; Schilberg, Daniel; Jeschke, Sabina

    2012-01-01

    Within the ramp-up phase of highly automated assembly systems, the planning effort forms a large part of production costs. Due to shortening product lifecycles, changing customer demands, and therefore an increasing number of ramp-up processes, these costs even rise. So assembly systems should reduce these efforts and simultaneously be flexible for quick adaption to changes in products and their variants. A cognitive interaction system in the field of assembly planning systems is developed wi...

  19. Influence of Slip Condition on Unsteady Free Convection Flow of Viscous Fluid with Ramped Wall Temperature

    Directory of Open Access Journals (Sweden)

    Sami Ul Haq

    2015-01-01

    Full Text Available The objective of this study is to explore the influence of wall slip condition on a free convection flow of an incompressible viscous fluid with heat transfer and ramped wall temperature. Exact solution of the problem is obtained by using Laplace transform technique. Graphical results to see the effects of Prandtl number Pr, time t, and slip parameter η on velocity and skin friction for the case of ramped and constant temperature of the plate are provided and discussed.

  20. Fuel pin behavior under slow ramp-type transient-overpower conditions in the CABRI-FAST experiments

    International Nuclear Information System (INIS)

    Fukano, Yoshitaka; Onoda, Yuichi; Sato, Ikken; Charpenel, Jean

    2009-01-01

    In the CABRI-FAST experimental program, four in-pile tests were performed with slow power-ramp-type transient-overpower conditions (called hereafter as 'slow TOP') to study transient fuel pin behavior under inadvertent control rod withdrawal events in liquid metal cooled fast breeder reactors. Annular-pellet fuel pins were used in three tests, while a solid-pellet fuel pin was used in the other test. All of these pins were pre-irradiated in Phenix. The slow TOP test with a solid-pellet fuel pin was realized as a comparatory test against an existing test (E12) in the CABRI-2 program. In the CABRI-FAST test (BCF1), a power ramp rate of 3% Po/s was applied, while in the CABRI-2 test, 1% Po/s was adopted. Moreover, overpower condition was maintained for a few seconds beyond the observed pin failure in the BCF1 test. In spite of the different power ramp rates, evaluated fuel thermal conditions at the observed failure time are quite similar. The continued overpower condition in the BCF1 test resulted in gradual degradation of the pin structure providing information effective for evaluation of various accident scenarios. Three slow TOP tests with the annular fuel in the CABRI-FAST program resulted in no pin failure showing high failure threshold. Based on post-test examination data and a theoretical evaluation, it was concluded that intra-pin free spaces, such as central hole, macroscopic cracks and fuel-cladding gap effectively mitigated fuel cladding mechanical interaction. It was also clarified that cavity pressurization became effective only in case of very large amount of fuel melting. Furthermore, such cavity pressurization was effectively mitigated by a molten-fuel squirting into the upper blanket region pushing the blanket pellets upward. These CABRI FAST slow TOP tests, in combination with the existing CABRI and TREAT tests, provided an extended slow TOP test database with various fuel and transient conditions. (author)

  1. Flow control of micro-ramps on supersonic forward-facing step flow

    International Nuclear Information System (INIS)

    Zhang Qing-Hu; Zhu Tao; Wu Anping; Yi Shihe

    2016-01-01

    The effects of the micro-ramps on supersonic turbulent flow over a forward-facing step (FFS) was experimentally investigated in a supersonic low-noise wind tunnel at Mach number 3 using nano-tracer planar laser scattering (NPLS) and particle image velocimetry (PIV) techniques. High spatiotemporal resolution images and velocity fields of supersonic flow over the testing model were captured. The fine structures and their spatial evolutionary characteristics without and with the micro-ramps were revealed and compared. The large-scale structures generated by the micro-ramps can survive the downstream FFS flowfield. The micro-ramps control on the flow separation and the separation shock unsteadiness was investigated by PIV results. With the micro-ramps, the reduction in the range of the reversal flow zone in streamwise direction is 50% and the turbulence intensity is also reduced. Moreover, the reduction in the average separated region and in separation shock unsteadiness are 47% and 26%, respectively. The results indicate that the micro-ramps are effective in reducing the flow separation and the separation shock unsteadiness. (paper)

  2. Evolution of plasma wakes in density up- and down-ramps

    Science.gov (United States)

    Zhang, C. J.; Joshi, C.; Xu, X. L.; Mori, W. B.; Li, F.; Wan, Y.; Hua, J. F.; Pai, C. H.; Wang, J.; Lu, W.

    2018-02-01

    The time evolution of plasma wakes in density up- and down-ramps is examined through theory and particle-in-cell simulations. Motivated by observation of the reversal of a linear plasma wake in a plasma density upramp in a recent experiment (Zhang et al 2017 Phys. Rev. Lett. 119 064801) we have examined the behaviour of wakes in plasma ramps that always accompany any plasma source used for plasma-based acceleration. In the up-ramp case it is found that, after the passage of the drive pulse, the wavnumber/wavelength of the wake starts to decrease/increase with time until it eventually tends to zero/infinity, then the wake reverses its propagation direction and the wavenunber/wavelength of the wake begins to increase/shrink. The evolutions of the wavenumber and the phase velocity of the wake as functions of time are shown to be significantly different in the up-ramp and the down-ramp cases. In the latter case the wavenumber of the wake at a particular position in the ramp increases until the wake is eventually damped. It is also shown that the waveform of the wake at a particular time after being excited can be precisely controlled by tuning the initial plasma density profile, which may enable a new type of plasma-based ultrafast optics.

  3. Beam Diagnosis and Lattice Modeling of the Fermilab Booster

    International Nuclear Information System (INIS)

    Huang, Xiaobiao

    2005-01-01

    A realistic lattice model is a fundamental basis for the operation of a synchrotron. In this study various beam-based measurements, including orbit response matrix (ORM) and BPM turn-by-turn data are used to verify and calibrate the lattice model of the Fermilab Booster. In the ORM study, despite the strong correlation between the gradient parameters of adjacent magnets which prevents a full determination of the model parameters, an equivalent lattice model is obtained by imposing appropriate constraints. The fitted gradient errors of the focusing magnets are within the design tolerance and the results point to the orbit offsets in the sextupole field as the source of gradient errors. A new method, the independent component analysis (ICA) is introduced to analyze multiple BPM turn-by-turn data taken simultaneously around a synchrotron. This method makes use of the redundancy of the data and the time correlation of the source signals to isolate various components, such as betatron motion and synchrotron motion, from raw BPM data. By extracting clean coherent betatron motion from noisy data and separates out the betatron normal modes when there is linear coupling, the ICA method provides a convenient means to measure the beta functions and betatron phase advances. It also separates synchrotron motion from the BPM samples for dispersion function measurement. The ICA method has the capability to separate other perturbation signals and is robust over the contamination of bad BPMs. The application of the ICA method to the Booster has enabled the measurement of the linear lattice functions which are used to verify the existing lattice model. The transverse impedance and chromaticity are measured from turn-by-turn data using high precision tune measurements. Synchrotron motion is also observed in the BPM data. The emittance growth of the Booster is also studied by data taken with ion profile monitor (IPM). Sources of emittance growth are examined and an approach to cure

  4. Report on the access to the deposition areas of the repository. Shaft or Ramp?; Utredning roerande tilltraedesvaegar till djupfoervarets deponeringsomraaden. Schakt eller ramp?

    Energy Technology Data Exchange (ETDEWEB)

    Baeckblom, Goeran [Conrox (Sweden); Christiansson, Rolf; Hedin, Allan; Norman, Fredrik [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Lagerstedt, Leif [SwedPower AB, Stockholm (Sweden)

    2003-05-01

    During year 2002, SKB launched the site-specific engineering of the repository at the Oskarshamn and Oesthammar candidate sites. A part of the ongoing engineering work is to evaluate and possibly select type of access from surface to the underground deposition areas located at a depth of some 400 to 700 metres below the surface. The project objectives are to provide a basis for comparison and to compare generic options for access routes to the underground deposition areas, to formulate preliminary Design Justification Statements for the continued site-specific engineering of access routes to the underground repository and also to describe and exemplify methodology for optimisation of the repository engineering. In consideration of the requirements of SKB, several alternative access options are explored. The main alternatives are a ramp with one or two operational areas at the surface, a ramp with parallel excavation of a blind shaft and an alternative with shafts only. A suite of objective functions were employed in the evaluation of the main alternatives relating to long-term safety, occupational safety during construction and operation, environmental impact, sustainability of natural resources, total cost, schedules, flexibility and project risks. All alternatives studied are feasible and safe, but the alternative with a spiral ramp and a blind shaft is deemed to be the most favourable option. The alternative has the highest flexibility without any tangible disadvantages related neither to long-term safety, environmental impact nor to schedules. It is an advantage that ramp traffic is drastically reduced as rock and backfilling material is transported by the skip rather than by vehicles in the ramp, thereby reducing risks of accidents and fires in the ramp. The concurrent ramp and shaft excavation also shorten the construction period with 18 months for the underground excavations. The discounted total cost is however 100 million Swedish Kronor higher for this

  5. Summary of the 70 GeV Booster Group

    International Nuclear Information System (INIS)

    Makdisi, Y.; Khiari, F.

    1985-06-01

    The energy range of the 70 GeV SSC booster makes it difficult to employ a single technique for preserving the beam polarization. Results of DEPOL calculations show that the expected resonance strengths are below the .5 x 10 -1 level, which poses no problem for resonance jumping. It was found that a single adiabatically energized Siberian snake will not significantly depolarize the beam. Thus one good solution to the mixing problem is that the snake magnets be energized during the acceleration cycle reaching maximum operating value at 20 GeV, where they take over the resonance jumping role. The possibility of adiabatically energizing two snakes was found to be feasible

  6. Making the Case for Reusable Booster Systems: The Operations Perspective

    Science.gov (United States)

    Zapata, Edgar

    2012-01-01

    Presentation to the Aeronautics Space Engineering Board National Research Council Reusable Booster System: Review and Assessment Committee. Addresses: the criteria and assumptions used in the formulation of current RBS plans; the methodologies used in the current cost estimates for RBS; the modeling methodology used to frame the business case for an RBS capability including: the data used in the analysis, the models' robustness if new data become available, and the impact of unclassified government data that was previously unavailable and which will be supplied by the USAF; the technical maturity of key elements critical to RBS implementation and the ability of current technology development plans to meet technical readiness milestones.

  7. Laser-plasma booster for ion post acceleration

    Directory of Open Access Journals (Sweden)

    Satoh D.

    2013-11-01

    Full Text Available A remarkable ion energy increase is demonstrated for post acceleration by a laser-plasma booster. An intense short-pulse laser generates a strong current by high-energy electrons accelerated, when this intense short-pulse laser illuminates a plasma target. The strong electric current creates a strong magnetic field along the high-energy electron current in plasma. During the increase phase in the magnetic field, a longitudinal inductive electric field is induced for the forward ion acceleration by the Faraday law. Our 2.5-dimensional particle-in-cell simulations demonstrate a remarkable increase in ion energy by several tens of MeV.

  8. Shielding for a tandem accelerator coupled to linac booster

    International Nuclear Information System (INIS)

    Bhattacharyya, S.; Bisht, J.S.; Venkataraman, G.

    1996-01-01

    Shielding calculation for the Beam-Hall-II of pelletron facility, augmented with linac booster in its phase-II at Nuclear Science Centre, New Delhi, has been done. An estimate is obtained by reduction factor method considering source radiation of monoenergetic neutrons, which is then compared with the detail computation using computer code ALICE considering total energy and angular distribution of neutrons. Another code ASFIT is used to take into account the build up of gamma dose from (n, gamma) reactions within the concrete shield incorporating new radiation weighting factors as recommended by ICRP-60. (author). 8 refs., 2 figs

  9. Nuclear power in space

    International Nuclear Information System (INIS)

    Aftergood, S.; Hafemeister, D.W.; Prilutsky, O.F.; Rodionov, S.N.; Primack, J.R.

    1991-01-01

    Nuclear reactors have provided energy for satellites-with nearly disastrous results. Now the US government is proposing to build nuclear-powered boosters to launch Star Wars defenses. These authors represent scientific groups that are opposed to the use of nuclear power in near space. The authors feel that the best course for space-borne reactors is to ban them from Earth orbit and use them in deep space

  10. Status of rf development work on a ferrite tuned amplifier cavity for the TRIUMF KAON factory booster ring

    International Nuclear Information System (INIS)

    Poirier, R.L.; Enegren, T.

    1987-01-01

    Of the five synchrotron rings in the proposed TRIUMF KAON factory, the Booster ring to accelerate the proton beam from 440 MeV to 3 GeV has the most demanding rf requirements, primarily because of the relatively large frequency swing of 46.1 MHz to 61.1 MHz at a high repetition rate of 50 Hz. In the current reference design, the Booster lattice has twelve 3.9 m drift spaces with 2.5 m in each drift space available for installation of rf cavities to provide a required effective acceleration voltage of up to 600 kV per turn i.e. 50 kV per cavity. Design and development studies of a suitable cavity-amplifier system are in progress. For the initial reference design a system based on the one used in the Fermilab booster synchrotron has been chosen. That is, a double-gap drift-tube cavity with parallel-biased ferrite tuners and excited with a directly coupled Eimac Y567B tetrode. To meet the tuning and voltage requirements within the various mechanical and other constraints such as tube-to-gap voltage ratio, ferrite power density and available space, the reference design had to be further modified and a cold model of the cavity and tuners was constructed from copper-covered cardboard cylinders. From the results of the cold model measurements a new reference design was established and design work has begun on a full power prototype of the cavity-amplifier system

  11. The effects on grid matching and ramping requirements, of single and distributed PV systems employing various fixed and sun-tracking technologies

    International Nuclear Information System (INIS)

    Solomon, A.A.; Faiman, D.; Meron, G.

    2010-01-01

    In this second paper, which studies the hourly generation data from the Israel Electric Corporation for the year 2006, with a view to adding very large-scale photovoltaic power (VLS-PV) plants, three major extensions are made to the results reported in our first paper. In the first extension, PV system simulations are extended to include the cases of 1- and 2-axis sun-tracking, and 2-axis concentrator photovoltaic (CPV) technologies. Secondly, the effect of distributing VLS-PV plants among 8 Negev locations, for which hourly metrological data exist, is studied. Thirdly, in addition to studying the effect of VLS-PV on grid penetration, the present paper studies its effect on grid ramping requirements. The principal results are as follows: (i) sun-tracking improves grid matching at high but not low levels of grid flexibility; (ii) geographical distribution has little effect on grid penetration; (iii) VLS-PV significantly increases grid ramping requirements, particularly for CPV systems, but not beyond existing ramping capabilities; (iv) geographical distribution considerably ameliorates this effect.

  12. Magnet power supplies for the Advanced Light Source

    International Nuclear Information System (INIS)

    Jackson, L.T.; Lutz, I.C.

    1989-03-01

    The Lawrence Berkeley Laboratory (LBL) is building an Advanced Light Source (ALS) to produce synchrotron radiation. An electron linear accelerator, and a booster synchrotron are used to accelerate the electron beam to 1.5 GeV to fill the storage ring. This paper describes the power supplies used for the magnets in the booster and the storage ring and the interface requirements for computer control and monitoring the power supplies and magnet currents. 1 ref., 3 figs., 2 tabs

  13. 47 CFR 73.3521 - Mutually exclusive applications for low power television, television translators and television...

    Science.gov (United States)

    2010-10-01

    ... television, television translators and television booster stations. 73.3521 Section 73.3521 Telecommunication... Applicable to All Broadcast Stations § 73.3521 Mutually exclusive applications for low power television, television translators and television booster stations. When there is a pending application for a new low...

  14. Preparations for Upgrading the RF Systems of the PS Booster

    CERN Document Server

    Albright, Simon; Shaposhnikova, Elena

    2016-01-01

    The accelerators of the LHC injector chain need to be upgraded to provide the HL-LHC beams. The PS Booster, the first synchrotron in the LHC injection chain, uses three different RF systems (first, second and up to tenth harmonic) in each of its four rings. As part of the LHC Injector Upgrade the current ferrite RF systems will be replaced with broadband Finemet cavities, increasing the flexibility of the RF system. A Finemet test cavity has been installed in Ring 4 to investigate its effect on machine performance, especially beam stability, during extensive experimental studies. Due to large space charge impedance Landau damping is lost through most of the cycle in single harmonic operation, but is recovered when using the second harmonic and controlled longitudinal emittance blow-up. This paper compares beam parameters during acceleration with and without the Finemet test cavity. Comparisons were made using beam measurements and simulations with the BLonD code based on a full PS Booster impedance model. Thi...

  15. Charge exchange injection for Nuclotron and Nuclotron booster

    International Nuclear Information System (INIS)

    Dinev, D.; Mikhajlov, V.

    2000-01-01

    The acceleration of polarized beams is between the major items in the JINR LHE's heavy ion superconducting synchrotron Nuclotron research programme. One effective way to increase the intensities of polarized deuteron beams is the application of the charge exchange injection into the Nuclotron. The paper represents the results of a new analytical description of the heavy ion stripping injection based on the Boltzmann kinetic equation. Expressions for the ion density evolution in the transverse phase plane for the emittance growth due to the elastic scattering and to energy losses in the stripping foil and for the number of successfully stored particles have been derived. These results have been applied to the stripping injection of polarized deuterons into the Nuclotron as well as to the stripping injection of heavy ions into the now under consideration Nuclotron rapid cycling booster. It has been shown that an estimated 40-fold intensity gain could be achieved for the stripping injection of polarized D - into the Nuclotron and that an effective stripping injection of light and medium ions into the booster could be realized

  16. Yalina booster subcritical assembly performance with low enriched uranium fuel

    International Nuclear Information System (INIS)

    Talamo, Alberto; Gohar, Yousry

    2011-01-01

    The YALINA Booster facility is a subcritical assembly located in Minsk, Belarus. The facility has special features that result in fast and thermal neutron spectra in different zones. The fast zone of the assembly uses a lead matrix and uranium fuels with different enrichments: 90% and 36%, 36%, or 21%. The thermal zone of the assembly contains 10% enriched uranium fuel in a polyethylene matrix. This study discusses the performance of the three YALINA Booster configurations with the different fuel enrichments. In order to maintain the same subcriticality level in the three configurations, the number of fuel rods in the thermal zone is increased as the uranium fuel enrichment in the fast zone is decreased. The maximum number of fuel rods that can be loaded in the thermal zone is about 1185. Consequently, the neutron multiplication of the configuration with 21% enriched uranium fuel in the fast zone is enhanced by changing the position of the boron carbide and the natural uranium absorber rods, located between the fast and the thermal zones, to form an annular rather than a square arrangement. (author)

  17. Yalina booster subcritical assembly performance with low enriched uranium fuel

    Energy Technology Data Exchange (ETDEWEB)

    Talamo, Alberto; Gohar, Yousry, E-mail: alby@anl.gov [Argonne National Laboratory, Lemont, IL (United States)

    2011-07-01

    The YALINA Booster facility is a subcritical assembly located in Minsk, Belarus. The facility has special features that result in fast and thermal neutron spectra in different zones. The fast zone of the assembly uses a lead matrix and uranium fuels with different enrichments: 90% and 36%, 36%, or 21%. The thermal zone of the assembly contains 10% enriched uranium fuel in a polyethylene matrix. This study discusses the performance of the three YALINA Booster configurations with the different fuel enrichments. In order to maintain the same subcriticality level in the three configurations, the number of fuel rods in the thermal zone is increased as the uranium fuel enrichment in the fast zone is decreased. The maximum number of fuel rods that can be loaded in the thermal zone is about 1185. Consequently, the neutron multiplication of the configuration with 21% enriched uranium fuel in the fast zone is enhanced by changing the position of the boron carbide and the natural uranium absorber rods, located between the fast and the thermal zones, to form an annular rather than a square arrangement. (author)

  18. Design and testing of the AGS Booster BPM detector

    International Nuclear Information System (INIS)

    Thomas, R.; Ciardullo, D.J.; Van Zwienen, W.

    1991-01-01

    The AGS Booster beam position monitor system must accurately measure the position of beams and bunches over a wide range of intensity. The frequency of operation must also cover a wide range (600 kHz to 4.2 MHz) since the Booster accelerates both protons and heavy ions. Split-cylinder electrodes were chosen to monitor the position of the beam because of their good low frequency response and high linearity. The need to accelerate low-energy partially-stripped heavy ions requires the pick-up electrodes (PUEs) to operate in a 3 x 10 -11 torr vacuum. The PUEs are to measure the beam position to an absolute accuracy of ±0.5 mm and must therefore be mechanically stable despite the requirements that they be vacuum fired at 950 degree C and baked periodically to 300 degree C. This presentation describes both the mechanical design of the PUEs and the automated test procedure used to ensure the stability, accuracy, and linearity of each unit. 3 refs., 5 figs

  19. Multi-year remote-sensing measurements of gasoline light-duty vehicle emissions on a freeway ramp

    International Nuclear Information System (INIS)

    Sjoedin, A.; Andreasson, K.

    2000-01-01

    On-road optical remote-sensing measurements of gasoline light-duty vehicle (LDV) emissions - CO, HC, NO - were conducted on a freeway ramp in Gothenburg, Sweden, in 1991, 1995 and 1998. Based on almost 30,000 emission measurements, the results show that both catalyst cars and non-catalyst cars emissions deteriorate over time, but also that the emission performance of new TWC-cars has improved significantly in recent years. Furthermore, it was found that fleet age rather than model year determines the rate of emission deterioration for TWC-cars for both CO and NO. The study demonstrates that remote sensing may constitute a powerful tool to evaluate real-world LDV emissions; however, daily field calibration procedures need to be developed in order to assure that the evolution in fleet average emissions can be accurately measured. (author)

  20. Effect of reactor finiteness on the boundary condition at the surface of a booster section

    International Nuclear Information System (INIS)

    Wassef, W.A.

    1982-01-01

    Effect of reactor finiteness on the boundary condition at the surface of an absorbing booster embedded in the reactor core is studied and formulated. The model used in these calculations depends on the Pl-Transport coupling technique. This method takes into consideration the rigorous neutron transport behavior inside the booster medium, while the Pl-approximation in the bulk of the scattering medium surrounding the booster which can be considered infinite in most practical applications. The neutron flux gradient parallel to the surface of the booster is considered. The geometrical configuration of the reactor core cross section is circular or rectangular. Finiteness of the reactor is introduced in the general formulation through its dimensions or buckling. Extensive numerical results are given to demonstrate the dependence of the boundary condition at the surface of the booster section on the reactor finiteness and the different physical parameters

  1. 47 CFR 73.827 - Interference to the input signals of FM translator or FM booster stations.

    Science.gov (United States)

    2010-10-01

    ... translator or FM booster stations. 73.827 Section 73.827 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Interference to the input signals of FM translator or FM booster stations. (a) An authorized LPFM station will not be permitted to continue to operate if an FM translator or FM booster station demonstrates that...

  2. A New Macro Model for Traffic Flow on a Highway with Ramps and Numerical Tests

    International Nuclear Information System (INIS)

    Tang Tieqiao; Huang Haijun; Zhang Ying; Wong, S.C.; Gao Ziyou

    2009-01-01

    In this paper, we present a new macro model for traffic flow on a highway with ramps based on the existing models. We use the new model to study the effects of on-off-ramp on the main road traffic during the morning rush period and the evening rush period. Numerical tests show that, during the two rush periods, these effects are often different and related to the status of the main road traffic. If the main road traffic flow is uniform, then ramps always produce stop-and-go traffic when the main road density is between two critical values, and ramps have little effect on the main road traffic when the main road density is less than the smaller critical value or greater than the larger critical value. If a small perturbation appears on the main road, ramp may lead to stop-and-go traffic, or relieve or even eliminate the stop-and-go traffic, under different circumstances. These results are consistent with real traffic, which shows that the new model is reasonable.

  3. A Density-Based Ramp Metering Model Considering Multilane Context in Urban Expressways

    Directory of Open Access Journals (Sweden)

    Li Tang

    2017-01-01

    Full Text Available As one of the most effective intelligent transportation strategies, ramp metering is regularly discussed and applied all over the world. The classic ramp metering algorithm ALINEA dominates in practical applications due to its advantages in stabilizing traffic flow at a high throughput level. Although ALINEA chooses the traffic occupancy as the optimization parameter, the classic traffic flow variables (density, traffic volume, and travel speed may be easier obtained and understood by operators in practice. This paper presents a density-based ramp metering model for multilane context (MDB-RM on urban expressways. The field data of traffic flow parameters is collected in Chengdu, China. A dynamic density model for multilane condition is developed. An error function represented by multilane dynamic density is introduced to adjust the different usage between lanes. By minimizing the error function, the density of mainstream traffic can stabilize at the set value, while realizing the maximum decrease of on-ramp queues. Also, VISSIM Component Object Model of Application Programming Interface is used for comparison of the MDB-RM model with a noncontrol, ALINEA, and density-based model, respectively. The simulation results indicate that the MDB-RM model is capable of achieving a comprehensive optimal result from both sides of the mainstream and on-ramp.

  4. Optimizing the current ramp-up phase for the hybrid ITER scenario

    International Nuclear Information System (INIS)

    Hogeweij, G.M.D.; Citrin, J.; Artaud, J.-F.; Imbeaux, F.; Litaudon, X.; Casper, T.A.; Köchl, F.; Voitsekhovitch, I.

    2013-01-01

    The current ramp-up phase for the ITER hybrid scenario is analysed with the CRONOS integrated modelling suite. The simulations presented in this paper show that the heating systems available at ITER allow, within the operational limits, the attainment of a hybrid q profile at the end of the current ramp-up. A reference ramp-up scenario is reached by a combination of NBI, ECCD (UPL) and LHCD. A heating scheme with only NBI and ECCD can also reach the target q profile; however, LHCD can play a crucial role in reducing the flux consumption during the ramp-up phase. The optimum heating scheme depends on the chosen transport model, and on assumptions of parameters like n e peaking, edge T e,i and Z eff . The sensitivity of the current diffusion on parameters that are not easily controlled, shows that development of real-time control is important to reach the target q profile. A first step in that direction has been indicated in this paper. Minimizing resistive flux consumption and optimizing the q profile turn out to be conflicting requirements. A trade-off between these two requirements has to be made. In this paper it is shown that fast current ramp with L-mode current overshoot is at the one extreme, i.e. the optimum q profile at the cost of increased resistive flux consumption, whereas early H-mode transition is at the other extreme. (paper)

  5. Numerical investigation of over expanded flow behavior in a single expansion ramp nozzle

    Science.gov (United States)

    Mousavi, Seyed Mahmood; Pourabidi, Reza; Goshtasbi-Rad, Ebrahim

    2018-05-01

    The single expansion ramp nozzle is severely over-expanded when the vehicle is at low speed, which hinders its ability to provide optimal configurations for combined cycle engines. The over-expansion leads to flow separation as a result of shock wave/boundary-layer interaction. Flow separation, and the presence of shocks themselves, result in a performance loss in the single expansion ramp nozzle, leading to reduced thrust and increased pressure losses. In the present work, the unsteady two dimensional compressible flow in an over expanded single expansion ramp nozzle has been investigated using finite volume code. To achieve this purpose, the Reynolds stress turbulence model and full multigrid initialization, in addition to the Smirnov's method for examining the errors accumulation, have been employed and the results are compared with available experimental data. The results show that the numerical code is capable of predicting the experimental data with high accuracy. Afterward, the effect of discontinuity jump in wall temperature as well as the length of straight ramp on flow behavior have been studied. It is concluded that variations in wall temperature and length of straight ramp change the shock wave boundary layer interaction, shock structure, shock strength as well as the distance between Lambda shocks.

  6. Beam dynamics calculations for the linac booster beam line

    International Nuclear Information System (INIS)

    Lu, J.Q.; Cramer, J.G.; Storm, D.W.

    1987-01-01

    Beam optics focusing characteristics both in the transverse and longitudinal directions of the superconducting linac booster beam line are calculated for different particles. Three computer programs, which are TRANSPORT, LYRA and ENTIME, are used to simulate particle motions. The first one is used to simulate the particle radial motions. The effects of energy increase on to the transverse phase space area are considered by putting in accelerating matrices of each resonators. The second program is used to simulate particle longitudinal motions. Beam longitudinal motions are calculated with program ENTIME also, with which visual pictures in the Energy-Time phase space can be displayed on the terminal screen. Besides, the stability of the particle periodic motions in the radial directions are considered and calculated

  7. Automatic delamination defect detection in radiographic sequence of rocket boosters

    International Nuclear Information System (INIS)

    Rebuffel, V.; Pires, S.; Caplier, A.; Lamarque, P.

    2003-01-01

    Solid rocket motors are routinely examined in real-time X-ray radioscopic mode. The large and cylindrical boosters are rotating between a high energy source and a two dimensional detector. The purpose of this control is to detect possible defects all through the sample. In the tangential configuration, the part of the object that intersects the X-rays beam is the peripheral one, allowing to detect the delamination defect between the propellant and the external metal envelope. But the defect detectability is very poor due to the strong attenuation of the X-rays through the motors. During the rotation of the booster, the system acquires a sequence of radiographs where the defects are visible over several successive instants. We have previously developed a real-time tomo-synthesis system, processing the radiographs on line, and based on a tomo-synthesis reconstruction algorithm in order to improve the signal-to-noise ratio. This system is installed at the industrial site of Kourou, and is currently used by the operators in charge of the visual inspection of the boosters. In this paper, we present a method that processes the digital images obtained by the system in the purpose of automatically extracting the delamination defects. Due to the size and the poor contrast of the defects, a single image is not sufficient to perform this detection. A spatio-temporal aspect is required for the algorithm to be robust and efficient. In a first step, the proposed method computes the apparent local displacement between the current radiograph and a reference one. This reference image is acquired at the beginning of the rotation, with few noise, and is supposed to be defect free. The apparent displacement is due to the non-perfect rotation positioning. It may be uniform or not, depending on the deformation of the insulation liner of the metallic wall. The images are then registered and compared. On the resulting difference image we apply a smoothed threshold to obtain an

  8. Multipole Stack for the 800 MeV PS Booster

    CERN Multimedia

    1975-01-01

    The 800 MeV PS Booster had seen first beam in its 4 superposed rings in 1972, routine operation began in 1973. In the strive for ever higher beam intensities, the need for additional multipole lenses became evident. After detailed studies, the manufacture of 8 stacks of multipoles was launched in 1974. Each stack consists of 4 superposed multipoles and each multipole has 4 concentric shells. From the innermost to the outermost shell, Type A contains octupole, skew-octupole, sextupole, skew-sextupole. Type B contains skew-octupole, skew-sextupole, vertical dipole, horizontal dipole. Completion of installation in 1976 opened the way to higher beam intensities. M. Battiaz is seen here with a multipole stack and its many electrical connections.

  9. Space shuttle solid rocket booster water entry cavity collapse loads

    Science.gov (United States)

    Keefe, R. T.; Rawls, E. A.; Kross, D. A.

    1982-01-01

    Solid rocket booster cavity collapse flight measurements included external pressures on the motor case and aft skirt, internal motor case pressures, accelerometers located in the forward skirt, mid-body area, and aft skirt, as well as strain gages located on the skin of the motor case. This flight data yielded applied pressure longitudinal and circumferential distributions which compare well with model test predictions. The internal motor case ullage pressure, which is below atmospheric due to the rapid cooling of the hot internal gas, was more severe (lower) than anticipated due to the ullage gas being hotter than predicted. The structural dynamic response characteristics were as expected. Structural ring and wall damage are detailed and are considered to be attributable to the direct application of cavity collapse pressure combined with the structurally destabilizing, low internal motor case pressure.

  10. Improved Longitudinal Blow-up and Shaving in the Booster

    CERN Document Server

    Hancock, S

    2013-01-01

    The low-intensity proton beam for p-Pb collisions in the LHC did not come back in the Booster at the beginning of 2013 anything like it had been set up at the end of 2012. In particular there were unexplained intensity fluctuations of ±100%. Although the root cause of the drift in performance was never established, its investigation revealed long-standing issues in the longitudinal plane which, when corrected, allowed single-bunch beams to be delivered with unprecedented reproducibility and control of both intensity and longitudinal emittance. The new approach was adopted for the ion run and subsequently for MDs at higher intensities, where it made possible a robust control of intensity at constant 6D phase space volume. Post-LS1, it may even provide a platform upon which to build a more exotic controlled longitudinal blow-up to generate higher intensity bunches with a flattened line density.

  11. Bench measurements of coupling impedance of AGS Booster components

    International Nuclear Information System (INIS)

    Ratti, A.; Shea, T.J.

    1991-01-01

    Quantifying instability thresholds for modern synchrotrons and storage rings requires some knowledge of the accelerator's coupling impedance. To this end, the wire technique has been implemented to measure the longitudinal coupling impedance of AGS Booster devices. The techniques are being refined to allow measurement of RHIC devices at higher frequencies. All the measurements are performed using an HP 8753 Network Analyzer controlled via GPIB by a Macintosh computer. The computer provides an environment for automated data acquisition, data analysis, and report generation. Resistive matches between the 50ω analyzer cables and the 300ω pipe-and-wire structure allow the use of a simple response calibration in the measurement of S21 to 400MHz. Results from ferrite loaded rf cavities, position monitors and kickers are presented. 4 refs., 4 figs

  12. CERN's PS Booster LLRF renovation : plans and initial beam tests

    CERN Document Server

    Angoletta, ME; Butterworth, A; Findlay, A; Leinonen, PM; Molendijk, JC; Pedersen, F; Sanchez-Quesada, J; Schokker, M

    2010-01-01

    In 2008 a project was started to renovate the CERN's PS Booster (PSB) low-level RF (LLRF). Required LLRF capabilities include frequency program, beam phase, radial and synchronization loops. The new LLRF will control the signals feeding the three RF cavities present in each ring; it will also shape the beam in a dual harmonic mode, operate a bunch splitting and create a longitudinal blow-up. The main benefits of this new LLRF are its full remote and cycle-to-cycle controllability, built-in observation capability and flexibility. The overall aim is to improve the robustness, maintainability and reliability of the PSB operation and to make it compatible with the injection from the future Linac4. This paper outlines the main characteristics of the software and hardware building blocks. Initial beam test results and hints on the main milestones and future work are also given.

  13. The new frontier in muscular dystrophy research: booster genes

    DEFF Research Database (Denmark)

    Engvall, Eva; Wewer, Ulla M

    2003-01-01

    More than 30 different forms of muscular dystrophy (MD) have been molecularly characterized and can be diagnosed, but progress toward treatment has been slow. Gene replacement therapy has met with great difficulty because of the large size of the defective genes and because of difficulties...... of the boosters are better understood, drugs may be developed to provide the boost to muscle. Some of the experiences in models of muscular dystrophy may inspire new approaches in other genetic degenerative diseases as well....... in delivering a gene to all muscle groups. Cell replacement therapy has also been difficult to realize. Will it even be possible to design specific therapy protocols for all MDs? Or is a more realistic goal to treat some of the secondary manifestations that are common to several forms of MD, such as membrane...

  14. EMG and oxygen uptake responses during slow and fast ramp exercise in humans.

    Science.gov (United States)

    Scheuermann, Barry W; Tripse McConnell, Joyce H; Barstow, Thomas J

    2002-01-01

    This study examined the relationship between muscle recruitment patterns using surface electromyography (EMG) and the excess O(2) uptake (Ex.V(O(2))) that accompanies slow (SR, 8 W min(-1)) but not fast (FR, 64 W min(-1)) ramp increases in work rate (WR) during exercise on a cycle ergometer. Nine subjects (2 females) participated in this study (25 +/- 2 years, +/- S.E.M.). EMG was obtained from the vastus lateralis and medialis and analysed in the time (root mean square, RMS) and frequency (median power frequency, MDPF) domain. Results for each muscle were averaged to provide an overall response and expressed relative to a maximal voluntary contraction (%MVC). Delta.V(O(2))/DeltaWR was calculated for exercise below (S(1)) and above (S(2)) the lactate threshold (LT) using linear regression. The increase in RMS relative to the increase in WR for exercise below the LT (DeltaRMS/DeltaWR-S(1)) was determined using linear regression. Due to non-linearities in RMS above the LT, DeltaRMS/DeltaWR-S(2) is reported as the difference in RMS (DeltaRMS) and the difference in WR (DeltaWR) at end-exercise and the LT. SR was associated with a higher (P exercise is not associated with the recruitment of additional motor units since Ex.V(O(2)) was observed during SR only. Compared to the progressive decrease in MDPF observed during FR, the MDPF remained relatively constant during SR suggesting that either (i) there was no appreciable recruitment of the less efficient type II muscle fibres, at least in addition to those recruited initially at the onset of exercise, or (ii) the decrease in MDPF associated with fatigue was offset by the addition of a higher frequency of type II fibres recruited to replace the fatigued motor units.

  15. The ramp rate dependence of the sextupole field in superconducting dipoles

    International Nuclear Information System (INIS)

    Ghosh, A.K.; Robins, K.E.; Sampson, W.B.

    1993-01-01

    Sextupole components are induced in the magnetic field of superconducting dipoles when the current is changed. The magnitude of this effect depends on the rate of change of field, the strand-to-strand resistance in the superconducting cable, and the twist pitch of the wire. Ramp rate measurements have been made on a number of SSC dipoles wound from conductors with different interstrand resistances. The technique employed uses an array of Hall probes sensitive to the sextupole field and can measure the difference for field increasing or decreasing as a function of axial position. Magnets with very low interstrand resistance exhibit a large axial oscillation in the sextupole field between up and down ramps which is rate dependent When the strand resistance is high the amplitude of this oscillation is almost independent of ramp rate

  16. An Improved Macro Model of Traffic Flow with the Consideration of Ramps and Numerical Tests

    Directory of Open Access Journals (Sweden)

    Zhongke Shi

    2015-01-01

    Full Text Available We present an improved macro model for traffic flow based on the existing models. The equilibrium point equation of the model is obtained. The stop-and-go traffic phenomenon is described in phase plane and the relationship between traffic jams and system instability is clearly shown in the phase plane diagrams. Using the improved model, some traffic phenomena on a highway with ramps are found in this paper. The numerical simulation is carried out to investigate various nonlinear traffic phenomena with a single ramp generated by different initial densities and vehicle generation rates. According to the actual road sections of Xi’an-Baoji highways, the situations of morning peak with several ramps are also analyzed. All these results are consistent with real traffic, which shows that the improved model is reasonable.

  17. Influence of the ramp angle on levitation characteristics of HTS maglev

    International Nuclear Information System (INIS)

    He Qingyong; Wang Jiasu; Zhang Longcai; Wang Suyu; Pan Siting

    2008-01-01

    The gradeability is one of the advantages of the high-temperature superconducting (HTS) maglev vehicle, and it is relative to the levitation characteristic of the maglev system on the ramp. The influence of the ramp angle on the levitation characteristics of the HTS maglev model was investigated. Some levitation characteristic parameters on the uphill guideway with different ramp angles were studied by the equivalent experiment, such as the levitation force, the levitation gap, the levitation stiffness and the guidance force. Compared with the experimental results on the horizontal guideway, it was found that the levitation gap increased, but the levitation force and the levitation stiffness decreased. The levitation gap and the levitation stiffness are considered as the main maglev characteristic parameters needed to be taken into account

  18. Micro-Ramp Flow Control for Oblique Shock Interactions: Comparisons of Computational and Experimental Data

    Science.gov (United States)

    Hirt, Stephanie M.; Reich, David B.; O'Connor, Michael B.

    2012-01-01

    Computational fluid dynamics was used to study the effectiveness of micro-ramp vortex generators to control oblique shock boundary layer interactions. Simulations were based on experiments previously conducted in the 15- by 15-cm supersonic wind tunnel at the NASA Glenn Research Center. Four micro-ramp geometries were tested at Mach 2.0 varying the height, chord length, and spanwise spacing between micro-ramps. The overall flow field was examined. Additionally, key parameters such as boundary-layer displacement thickness, momentum thickness and incompressible shape factor were also examined. The computational results predicted the effects of the microramps well, including the trends for the impact that the devices had on the shock boundary layer interaction. However, computing the shock boundary layer interaction itself proved to be problematic since the calculations predicted more pronounced adverse effects on the boundary layer due to the shock than were seen in the experiment.

  19. Tune and Chromaticity Control During Snapback and Ramp in 2015 LHC Operation

    CERN Document Server

    Schaumann, Michaela; Lamont, Mike; Solfaroli Camillocci, Matteo; Todesco, Ezio; Wenninger, Jorg

    2016-01-01

    Because of current redistribution on the superconducting cables, the harmonic components of the magnetic fields of the superconducting magnets in the Large Hadron Collider (LHC) show decay during the low field injection plateau. This results in tune and chromaticity variations for the beams. In the first few seconds of the ramp the original hysteresis state of the magnetic field is restored - the field snaps back. These fast dynamic field changes lead to strong tune and chromaticity excursions that, if not properly controlled, induce beam losses and potentially trigger a beam dump. A feed-forward system applies predicted corrections during the injection plateau and to the first part of the ramp to avoid violent changes of beam conditions. This paper discusses the snapback of tune and chromaticity as observed in 2015, as well as the control of beam parameters during the ramp. It also evaluates the quality of the applied feed-forward corrections and their reproducibility.

  20. AC bias operation of the perpendicular biased ferrite tuned cavity for the TRIUMF KAON Factory booster synchrotron

    International Nuclear Information System (INIS)

    Poirier, R.L.; Enegren, T.A.; Enchevich, I.B.

    1991-05-01

    The RF cavity for the booster synchrotron requires a frequency swing from 46 MHz at a repetition rate of 50 Hz and a maximum accelerating gap voltage of 65 kV. A DC biased prototype cavity built at LANL using perpendicular-biased yttrium-garnet ferrites, rather than the more conventional parallel-biased NiZn ferrites, has now undergone major reconstruction at TRIUMF for AC bias operation. RF signal level measurements have shown that the frequency swing at a repetition rate of 50 Hz can be accomplished and still handle the eddy current losses in the cavity structures with minimal effect on the magnetizing field. The prototype cavity is now undergoing high power RF tests with full power AC bias operation. The results of these tests and operational experience is reported. (Author) ref., 6 figs

  1. Validation of a ramp running protocol for determination of the true VO2max in mice

    Directory of Open Access Journals (Sweden)

    Mohamed Ayachi

    2016-08-01

    Full Text Available In the field of comparative physiology, it remains to be established whether the concept of VO2max is valid in the mouse and, if so, how this value can be accurately determined. In humans, VO2max is generally considered to correspond to the plateau observed when VO2 no longer rises with an increase in workload. In contrast, the concept of VO2peak tends to be used in murine studies. The objectives of the present study were to determine whether (i a continuous ramp protocol yielded a higher VO2peak than a stepwise, incremental protocol, and (ii the VO2peak measured in the ramp protocol corresponded to VO2max. The three protocols (based on intensity-controlled treadmill running until exhaustion with eight female FVB/N mice were performed in random order: (a an incremental protocol that begins at 10 m.min-1 speed and increases by 3 m.min-1 every 3 min. (b a ramp protocol with slow acceleration (3 m.min-2, and (c a ramp protocol with fast acceleration (12 m.min-2. Each protocol was performed with two slopes (0° and 25°. Hence, each mouse performed six exercise tests. We found that the value of VO2peak was protocol-dependent (p 8 mmol.l-1 and a respiratory exchange ratio >1. The total duration of the 3 m.min-2 0° ramp protocol was shorter than that of the incremental protocol. Taken as a whole, our results suggest that VO2max in the mouse is best determined by applying a ramp exercise protocol with slow acceleration and no treadmill slope.

  2. Booster fans : some considerations for their usage in underground coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Gillies, S.; Slaughter, C. [Missouri Univ. of Science and Technology, Rolla, MO (United States); Calizaya, F. [Utah Univ., Salt Lake City, UT (United States); Wu, H.W. [Gillies Wu Mining Technology Pty Ltd., Brisbane, QLD (Australia)

    2010-07-01

    This paper reported on a study that investigated the conditions under which booster fans can be used safely and efficiently in underground coal mines. Booster fans are installed in series with a main surface fan and are used to boost the air pressure of the ventilation air passing through it. Several coal mining countries use booster fans, but in the United States, they are only used in metal/non-metal mines due to concerns of uncontrolled recirculation. This study investigated installations of booster fans in non-US underground coal mines where safe and efficient atmospheric conditions are achieved. The purpose was to collect reliable information on airway resistances and flow requirements typical in large US coal mines. The study showed that safe booster fan installations are found in both high and low gas conditions, and sometimes where workings are located at great depths. The interlocking systems within the booster fan can control the underground fans and avoid recirculation when surface fans are unexpectedly turned off. Another purpose of the study was to determine when booster fans become a more viable solution in coal mines due to increases in air requirements at higher production rates. It was concluded that a new fan selection algorithm to produce recirculation-free ventilation designs will be developed to enable US coal mine operators to develop ventilation designs to extract coal seams from depths greater than 1000 m. 17 refs., 1 fig.

  3. Performance evaluation of DAAF as a booster material using the onionskin test

    Energy Technology Data Exchange (ETDEWEB)

    Morris, John S [Los Alamos National Laboratory; Francois, Elizabeth G [Los Alamos National Laboratory; Hooks, Daniel E [Los Alamos National Laboratory; Hill, Larry G [Los Alamos National Laboratory; Harry, Herbert H [Los Alamos National Laboratory

    2010-12-02

    Initiation of insensitive high explosive (IHE) formulations requires the use of a booster explosive in the initiation train. Booster material selection is crucial, as the initiation must reliably function across some spectrum of physical parameters. The interest in Diaminoazoxyfurazan (DAAF) for this application stems from the fact that it possesses many traits of an IHE but is shock sensitive enough to serve as an explosive booster. A hemispherical wave breakout test, termed the onionskin test, is one of the methods used to evaluate the performance of a booster material. The wave breakout time-position history at the surface of a hemispherical IHE charge is recorded and the relative uniformity of the breakout can be quantitatively compared between booster materials. A series of onionskin tests were performed to investigate breakout and propagation diaminoazoxyfurazan (DAAF) at low temperatures to evaluate ignition and detonation spreading in comparison to other explosives commonly used in booster applications. Some wave perturbation was observed with the DAAF booster in the onionskin tests presented. The results of these tests will be presented and discussed.

  4. Case Report of Multiembolic Cerebrovascular Event Associated with Ramp Study Echocardiogram

    Directory of Open Access Journals (Sweden)

    Brian C. Butera

    2017-01-01

    Full Text Available The incidence of ramp test echocardiogram-associated embolic events in the setting of therapeutic anticoagulation is likely rare and has not been reported. We present such a case in a patient with a HeartMate II left ventricular assist device (LVAD whose serial head computed tomography images, deteriorating clinical course, and the multiembolic nature of the event suggest causality. If the pretest probability of pump thrombosis in an individual LVAD patient is sufficiently high, the potential risks of performing a ramp study echocardiogram may not be warranted, even in the setting of adequate anticoagulation.

  5. Variations in detachment levels, ramp angles and wedge geometries along the Alberta thrust front

    Energy Technology Data Exchange (ETDEWEB)

    Spratt, D. A.; Lawton, D. C. [Calgary Univ., AB (Canada). Dept. of Geology and Geophysics

    1996-06-01

    In addition to the three stratigraphic horizons previously described by other investigators, six extensive Upper Cretaceous detachment horizons have been identified by detailed mapping, interpretation of high-resolution seismic data and regional correlation. Of the 984 ramp angles measured, the majority were found to fall between 10 degrees and 30 degrees. Ramp angles tended to decrease from north to south. This tendency was attributed to the thick sequence (2500 m) of competent rock involved in the deformation at Grande Cache, and the presence of multiple detachments and many thinner thrust sheets (100-500 m) in southern Alberta. 38 refs., 12 figs.

  6. Properties of Phase Transition of Traffic Flow on Urban Expressway Systems with Ramps and Accessory Roads

    International Nuclear Information System (INIS)

    Mei Chaoqun; Liu Yejin

    2011-01-01

    In this paper, we develop a cellular automaton model to describe the phase transition of traffic flow on urban expressway systems with on-off-ramps and accessory roads. The lane changing rules are given in detailed, the numerical results show that the main road and the accessory road both produce phase transitions. These phase transitions will often be influenced by the number of lanes, lane changing, the ramp flow, the input flow rate, and the geometry structure. (interdisciplinary physics and related areas of science and technology)

  7. Study of solid rocket motors for a space shuttle booster. Volume 1: Executive summary

    Science.gov (United States)

    1972-01-01

    The design, development, production, and launch support analysis for determining the solid propellant rocket engine to be used with the space shuttle are discussed. Specific program objectives considered were: (1) definition of engine designs to satisfy the performance and configuration requirements of the various vehicle/booster concepts, (2) definition of requirements to produce booster stages at rates of 60, 40, 20, and 10 launches per year in a man-rated system, and (3) estimation of costs for the defined SRM booster stages.

  8. Report on the access to the deposition areas of the repository. Shaft or Ramp?

    International Nuclear Information System (INIS)

    Baeckblom, Goeran; Christiansson, Rolf; Hedin, Allan; Norman, Fredrik; Lagerstedt, Leif

    2003-05-01

    During year 2002, SKB launched the site-specific engineering of the repository at the Oskarshamn and Oesthammar candidate sites. A part of the ongoing engineering work is to evaluate and possibly select type of access from surface to the underground deposition areas located at a depth of some 400 to 700 metres below the surface. The project objectives are to provide a basis for comparison and to compare generic options for access routes to the underground deposition areas, to formulate preliminary Design Justification Statements for the continued site-specific engineering of access routes to the underground repository and also to describe and exemplify methodology for optimisation of the repository engineering. In consideration of the requirements of SKB, several alternative access options are explored. The main alternatives are a ramp with one or two operational areas at the surface, a ramp with parallel excavation of a blind shaft and an alternative with shafts only. A suite of objective functions were employed in the evaluation of the main alternatives relating to long-term safety, occupational safety during construction and operation, environmental impact, sustainability of natural resources, total cost, schedules, flexibility and project risks. All alternatives studied are feasible and safe, but the alternative with a spiral ramp and a blind shaft is deemed to be the most favourable option. The alternative has the highest flexibility without any tangible disadvantages related neither to long-term safety, environmental impact nor to schedules. It is an advantage that ramp traffic is drastically reduced as rock and backfilling material is transported by the skip rather than by vehicles in the ramp, thereby reducing risks of accidents and fires in the ramp. The concurrent ramp and shaft excavation also shorten the construction period with 18 months for the underground excavations. The discounted total cost is however 100 million Swedish Kronor higher for this

  9. Deep repository for spent nuclear fuel. Facility description - Layout E. Spiral ramp with one operational area

    Energy Technology Data Exchange (ETDEWEB)

    Pettersson, Stig [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Forsgren, Ebbe [SwedPower AB, Stockholm (Sweden); Lange, Fritz [Lange Art AB, Stockholm (Sweden)

    2002-04-01

    This report documents a proposal for the design of the deep repository for spent nuclear fuel. The proposal is based on the principles that were formulated in the original KBS-3 study, but has been supplemented by investigations and experience to reflect current knowledge. The purpose of the report is to provide an integrated picture of the deep repository, as a basis for SKB's other work, e.g. environmental impact assessments, transport systems, safety issues and alternative locations, and to provide a co-ordinated account of the conditions and requirements concerning all of the necessary functions in the deep repository in order to have a well functioning facility. In addition, it should be possible to use the report as: a tool in the task of achieving a co-ordinated, safe and accepted design for the facility, a basis for further planning and costing, a basis for adaptation to geographic and other conditions for the particular location, a basis for information material, both within SKB and for interested parties outside, such as public authorities, municipalities and the general public. The capacity of the deep repository has been chosen on the basis of 40 years of operation of the Swedish nuclear power reactors, which will produce approximately 9,000 tons of uranium, equivalent to approximately 4,500 canisters. The design outlined is based on theoretical analyses of functions, safety requirements, procedures etc. that can be identified during the various phases of the construction and operation of the repository. In addition, preliminary organisation and staffing plans have been drawn up, for use as the basis for planning the necessary buildings. The report gives a vision of the overall layout and function of the facility, and a proposal for the design of all individual parts of the repository. The relationships between the various parts of the repository are described, both above and below ground, as is the interplay between the part above ground and part

  10. Deep repository for spent nuclear fuel. Facility description - Layout E. Spiral ramp with one operational area

    International Nuclear Information System (INIS)

    Pettersson, Stig; Forsgren, Ebbe; Lange, Fritz

    2002-04-01

    This report documents a proposal for the design of the deep repository for spent nuclear fuel. The proposal is based on the principles that were formulated in the original KBS-3 study, but has been supplemented by investigations and experience to reflect current knowledge. The purpose of the report is to provide an integrated picture of the deep repository, as a basis for SKB's other work, e.g. environmental impact assessments, transport systems, safety issues and alternative locations, and to provide a co-ordinated account of the conditions and requirements concerning all of the necessary functions in the deep repository in order to have a well functioning facility. In addition, it should be possible to use the report as: a tool in the task of achieving a co-ordinated, safe and accepted design for the facility, a basis for further planning and costing, a basis for adaptation to geographic and other conditions for the particular location, a basis for information material, both within SKB and for interested parties outside, such as public authorities, municipalities and the general public. The capacity of the deep repository has been chosen on the basis of 40 years of operation of the Swedish nuclear power reactors, which will produce approximately 9,000 tons of uranium, equivalent to approximately 4,500 canisters. The design outlined is based on theoretical analyses of functions, safety requirements, procedures etc. that can be identified during the various phases of the construction and operation of the repository. In addition, preliminary organisation and staffing plans have been drawn up, for use as the basis for planning the necessary buildings. The report gives a vision of the overall layout and function of the facility, and a proposal for the design of all individual parts of the repository. The relationships between the various parts of the repository are described, both above and below ground, as is the interplay between the part above ground and part below

  11. What determines product ramp-up performance? : a review of characteristics based on a case study at Nokia Mobile Phones

    NARCIS (Netherlands)

    Pufall, A.A.; Fransoo, J.C.; Kok, de A.G.

    2007-01-01

    We present a conceptual model to explore the essential characteristics that affect product ramp-up performance in the consumer electronics industry, specifically in the mobile phones sector. Our findings are based on data analysis within Nokia’s mobile phones business group. Fast product ramp-ups

  12. Implementation Guideline for Maintenance Line Operations Safety Assessment (M-LOSA) and Ramp LOSA (R-LOSA) Programs

    Science.gov (United States)

    2012-08-01

    Maintenance and/or Ramp LOSA)  Database  Observation protocol 16 hours; in person with hands-on observation and database practice 4. LOSA Database...Forms/Scenarios (Maintenance and/or Ramp LOSA)  Database  Observation protocol  Q&A Every year or every implementation run (whichever

  13. How does development lead time affect performance over the ramp-up lifecycle? : evidence from the consumer electronics industry

    NARCIS (Netherlands)

    Pufall, A.A.; Fransoo, J.C.; Jong, de A.; Kok, de A.G.

    2012-01-01

    In the fast-paced world of consumer electronics, short development lead times and efficient product ramp-ups are invaluable. The sooner and faster a firm can ramp-up production of a new product, the faster it can start to earn revenues, profit from early market opportunities, establish technology

  14. Optimization of Modulation Waveforms for Improved EMI Attenuation in Switching Frequency Modulated Power Converters

    Directory of Open Access Journals (Sweden)

    Deniss Stepins

    2015-01-01

    Full Text Available Electromagnetic interference (EMI is one of the major problems of switching power converters. This paper is devoted to switching frequency modulation used for conducted EMI suppression in switching power converters. Comprehensive theoretical analysis of switching power converter conducted EMI spectrum and EMI attenuation due the use of traditional ramp and multislope ramp modulation waveforms is presented. Expressions to calculate EMI spectrum and attenuation are derived. Optimization procedure of the multislope ramp modulation waveform is proposed to get maximum benefits from switching frequency modulation for EMI reduction. Experimental verification is also performed to prove that the optimized multislope ramp modulation waveform is very useful solution for effective EMI reduction in switching power converters.

  15. Regime-based supervisory control to reduce power fluctuations from offshore wind power plants

    DEFF Research Database (Denmark)

    Barahona Garzón, Braulio; Cutululis, Nicolaos Antonio; Trombe, Pierre-Julien

    2013-01-01

    Wind power fluctuations, especially offshore, can pose challenges in the secure and stable operation of the power system. In modern large offshore wind farms, there are supervisory controls designed to reduce the power fluctuations. Their operation is limited due to the fact that they imply loss...... that consider different wind power regimes to derive control setpoints by using a Markov-Switching AutoRegressive model. We evaluate the performance versus measured data in terms of power ramp characteristics and energy efficiency....

  16. Truck acceleration behavior study and acceleration lane length recommendations for metered on-ramps

    Directory of Open Access Journals (Sweden)

    Guangchuan Yang

    2016-10-01

    Full Text Available This paper investigated the actual truck acceleration capability at metered on-ramps. Truck acceleration performance data were collected through a video-based data collection method. A piecewise constant acceleration model was employed to capture truck acceleration characteristics. It was found that the existing acceleration length will affect truck drivers’ acceleration behavior. At the taper type ramp that has limited acceleration distance, acceleration profile indicated a decreasing trend with distance. While for the ramp with an auxiliary lane that has sufficient acceleration distance, it was found that the acceleration behavior is to have a high acceleration rate in the beginning, then acceleration rate decrease with speed increase, and high acceleration rate again as drivers approach the merging area. Field data show that the truck acceleration performance data documented in the ITE’s (Institute of Transportation Engineers “Traffic Engineering Handbook” are much lower than the field collected data. Also, based on the regression analysis of speed versus distance profiles, it was found that the AASHTO’s (American Association of State Highway and Transportation Officials Green Book acceleration length design guidance is insufficient to accommodate trucks at metered on-ramps. The required acceleration lengths for medium and heavy trucks are approximately 1.3 and 1.6 times of the Green Book design guideline, respectively.

  17. Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

    Science.gov (United States)

    Hayashi, Miwa; Hoang, Ty; Jung, Yoon C.; Malik, Waqar; Lee, Hanbong; Dulchinos, Victoria L.

    2015-01-01

    This paper proposes a new departure pushback decision-support tool (DST) for airport ramp-tower controllers. It is based on NASA's Spot and Runway Departure Advisor (SARDA) collaborative decision-making concept, except with the modification that the gate releases now are controlled by tactical pushback (or gate-hold) advisories instead of strategic pre-assignments of target pushback times to individual departure flights. The proposed ramp DST relies on data exchange with the airport traffic control tower (ATCT) to coordinate pushbacks with the ATCT's flow-management intentions under current operational constraints, such as Traffic Management Initiative constraints. Airlines would benefit in reduced taxi delay and fuel burn. The concept was evaluated in a human-in-the-loop simulation experiment with current ramp-tower controllers at the Charlotte Douglas International Airport as participants. The results showed that the tool helped reduce taxi time by one minute per flight and overall departure flight fuel consumption by 10-12% without reducing runway throughput. Expect Departure Clearance Time (EDCT) conformance also was improved when advisories were provided. These benefits were attained without increasing the ramp-tower controllers' workload. Additionally, the advisories reduced the ATCT controllers' workload.

  18. Start-up and ramp-up of the PLT tokamak by lower hybrid waves

    International Nuclear Information System (INIS)

    Jobes, F.C.; von Goeler, S.; Bernabei, S.

    1985-01-01

    Lower hybrid current drive (LHCD) is an inherently steady-state means of maintaining the poloidal field of a tokamak reactor. However, the energy losses of LHCD, which are proportional to density, are projected to be too great in a fusion reactor for LHCD to be economically feasible during the burn state of the reaction cycle. The authors maintain that LHCD could be extremely useful in restoring poloidal field energy between burns. In situations not requiring a rapid build up, LHCD appears, by extrapolation from present experiments, to be capable of supplying the full required poloidal field energy. In this paper, experiments have been performed on PLT and other tokamaks to examine the role of LHCD in start-up and ramp-up, as well as to examine the efficiency of stady-state current drice. Both the start-up and the ramp-up experiments were quite successful, with the start-up experiment obtaining currents up to 20% of full current for PLT, and the ramp-up experiments obtaining ramp-up efficiencies of approximately 20%

  19. Identification of anomalous Doppler resonance effect during current ramp down in HT-7 tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Li Erzhong, E-mail: rzhonglee@ipp.ac.c [Institute of Plasma Physics, Chinese Academy of Science, Hefei 230031 (China); Hu Liqun; Ling Bili; Liu Yong; Ti Ang; Zhou Reijie; Lu Hongwei; Gao Xiang [Institute of Plasma Physics, Chinese Academy of Science, Hefei 230031 (China)

    2010-09-21

    The abrupt steep jump of electron cyclotron emission (ECE) signals during current ramp-down has been observed and explained by an anomalous Doppler resonance effect (ADR). The identifying process of ADR was presented based on the fast Fourier transform (FFT) technique. The threshold value for triggering a steep jump on ECE signals has been identified under different discharge conditions.

  20. Effects of controlled element dynamics on human feedforward behavior in ramp-tracking tasks.

    Science.gov (United States)

    Laurense, Vincent A; Pool, Daan M; Damveld, Herman J; van Paassen, Marinus René M; Mulder, Max

    2015-02-01

    In real-life manual control tasks, human controllers are often required to follow a visible and predictable reference signal, enabling them to use feedforward control actions in conjunction with feedback actions that compensate for errors. Little is known about human control behavior in these situations. This paper investigates how humans adapt their feedforward control dynamics to the controlled element dynamics in a combined ramp-tracking and disturbance-rejection task. A human-in-the-loop experiment is performed with a pursuit display and vehicle-like controlled elements, ranging from a single integrator through second-order systems with a break frequency at either 3, 2, or 1 rad/s, to a double integrator. Because the potential benefits of feedforward control increase with steeper ramp segments in the target signal, three steepness levels are tested to investigate their possible effect on feedforward control with the various controlled elements. Analyses with four novel models of the operator, fitted to time-domain data, reveal feedforward control for all tested controlled elements and both (nonzero) tested levels of ramp steepness. For the range of controlled element dynamics investigated, it is found that humans adapt to these dynamics in their feedforward response, with a close to perfect inversion of the controlled element dynamics. No significant effects of ramp steepness on the feedforward model parameters are found.