WorldWideScience

Sample records for bonneville power administration

  1. Bonneville Power Administration 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  2. Bonneville Power Administration 1991 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

  3. Bonneville Power Administration 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  4. Bonneville Power Administration 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  5. Bonneville Power Administration`s Commercial Sector Conservation Market.

    Energy Technology Data Exchange (ETDEWEB)

    Gordan, Frederick M. [Pacific Energy Associates, Inc. (United States)

    1992-11-10

    Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

  6. Pressurization test results: Bonneville Power Administration Energy Conservation Study

    Energy Technology Data Exchange (ETDEWEB)

    Krinkel, D.L.; Dickeroff, D.J.; Casey, J.; Grimsrud, D.T.

    1980-12-01

    Results are presented of air leakage measurements in 18 single-family detached houses at the Midway substation, Hanford, Washington, performed as part of the Bonneville Power Administration's Energy Conservation Study. The change in energy consumption following various retrofit strategies is compared. Air leakage was measured in each house with the fan pressurization technique, before and after the retrofits were installed. No significant change was found in infiltration rates in those houses receiving either no retrofits or insulation only; and average reduction of 17% in leakage area was found in the houses retrofitted with storm doors and windows. There appears to be great potential for further savings in energy use from reduced infiltration, and the study is being extended to investigate this.

  7. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  8. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  9. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Englin, J E; Gygi, K F

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs.

  10. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    International Nuclear Information System (INIS)

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs

  11. Comparisons among participants and nonparticipants in the Bonneville Power Administration residential weatherization pilot program

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; Goeltz, R.; Bronfman, B.

    1985-01-01

    Between 1980 and 1982, the Bonneville Power Administration (BPA) operated a Residential Weatherization Pilot Program. The program offered free home energy audits and zero-interest loans to encourage installation of retrofit measures in electrically heated homes. The households that participated in the BPA program differed considerably from households eligible for the program that did not participate. Generally, participants had larger families, more education, higher incomes, and had fewer retrofit measures in place before the program started than did the nonparticipants. 5 references, 1 figure, 5 tables.

  12. Evaluation plan for the Bonneville Power Administration residential energy-conservation programs. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; Berry, L.; Bronfman, B.H.; Johnson, K.E.; Tepel, R.; Trimble, J.L.

    1982-07-01

    A detailed plan is presented for evaluation of the residential energy conservation programs offered by the Bonneville Power Administration (BPA) to the utilities in its four-state region. The steps suggested to conduct a comprehensive evaluation of the program are concisely stated, and include: evaluation planning, data collection and processing, analysis of evaluation issues (energy savings, cost-effectiveness, differences between participants and nonparticipants, and comparison of heat loss methodology results with data), and evaluation outputs. The programs to be evaluated include the shower flow restrictor program, water heater wrap program, and the residential weatherization program. (LEW)

  13. Process evaluation of the Bonneville Power Administration Interim Residential Weatherization Program

    Energy Technology Data Exchange (ETDEWEB)

    Lerman, D.I.; Bronfman, B.H.

    1984-08-01

    A process evaluation of the Bonneville Power Administration (BPA) Interim Residential Weatherization Program was conducted between December of 1983 and March of 1984. For this evaluation seven of the utility participants were visited, as were the four BPA area offices serving those utilities. Interviews were also conducted with key staff members at BPA headquarters in Portland. This report describes the Interim Program and the elements of the BPA organizational structure involved in management of the program. It deals also with the implementation process at the seven utilities involved in the evaluation; perceptions of the key actors as to the strengths and weaknesses of the program; the adequacy of the BPA reimbursement for utility administrative expenses; and finally lessons for the Long-Term Program, the BPA residential program which followed the Interim Program in October 1983.

  14. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  15. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program

    International Nuclear Information System (INIS)

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives

  16. Design and operation of the 30-MJ superconducting magnetic-storage system on the Bonneville Power Administration bus

    International Nuclear Information System (INIS)

    A superconducting magnetic-energy-storage (SMES) unit is suitable for power-system stabilization because it can provide positive damping by absorbing or releasing energy with a relatively fast response time, 10 ms. In the fall of 1982, an SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration as an experiment in monitoring, predicting and improving system stability. This paper reports principally on the system testing

  17. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  18. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    Energy Technology Data Exchange (ETDEWEB)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  19. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Naomi

    2011-07-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  20. Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

    DEFF Research Database (Denmark)

    Makarov, Yuri V.; Yang, Bo; DeSteese, John G.;

    2009-01-01

    This paper addresses the issue of mitigating additional intermittency and fast ramps that are expected to occur at high penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator (C...

  1. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C S; Burk, K W; Driver, C J; Liljegren, J C; Neitzel, D A; Schwartz, M N; Dana, M T; Laws, G L; Mahoney, L A; Rhoads, K

    1992-04-01

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.

  2. Multifunctional data acquisition and analysis and optical sensors: a Bonneville Power Administration (BPA) update

    Science.gov (United States)

    Erickson, Dennis C.; Donnelly, Matt K.

    1995-04-01

    The authors present a design concept describing a multifunctional data acquisition and analysis architecture for advanced power system monitoring. The system is tailored to take advantage of the salient features of low energy sensors, particularly optical types. The discussion of the system concept and optical sensors is based on research at BPA and PNL and on progress made at existing BPA installations and other sites in the western power system.

  3. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Science.gov (United States)

    2012-05-03

    ... fields, sensitive plants and animals, soil erosion, wetlands, floodplains, and fish and water resources... Substation in Western Montana to load centers west of the Cascades and to market hubs serving the entire Northwest power market. With this Notice of Intent, BPA is initiating the public scoping process for the...

  4. Operational Impacts of Wind Energy Resources in the Bonneville Power Administration Control Area - Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    Makarov, Yuri V.; Lu, Shuai

    2008-07-15

    This report presents a methodology developed to study the future impact of wind on BPA power system load following and regulation requirements. The methodology uses historical data and stochastic processes to simulate the load balancing processes in the BPA power system, by mimicking the actual power system operations. Therefore, the results are close to reality, yet the study based on this methodology is convenient to conduct. Compared with the proposed methodology, existing methodologies for doing similar analysis include dispatch model simulation and standard deviation evaluation on load and wind data. Dispatch model simulation is constrained by the design of the dispatch program, and standard deviation evaluation is artificial in separating the load following and regulation requirements, both of which usually do not reflect actual operational practice. The methodology used in this study provides not only capacity requirement information, it also analyzes the ramp rate requirements for system load following and regulation processes. The ramp rate data can be used to evaluate generator response/maneuverability requirements, which is another necessary capability of the generation fleet for the smooth integration of wind energy. The study results are presented in an innovative way such that the increased generation capacity or ramp requirements are compared for two different years, across 24 hours a day. Therefore, the impact of different levels of wind energy on generation requirements at different times can be easily visualized.

  5. 75 FR 60745 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2010-10-01

    ... Bonneville Power Administration Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville... of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which... administration of its purchases of goods and services, including construction, are available in printed form...

  6. The Bonneville Power Administration new energy-efficient homes programs: Final environmental impact statement: Volume 1, Assessing indoor air quality options

    International Nuclear Information System (INIS)

    BPA has underway marketing and incentive programs to encourage the construction of new energy-efficient homes that comply with Model Conservation Standards (MCS) developed by the Northwest Power Planning Council. These homes are designed to have lower infiltration rates than current building practices provide, which is likely to contribute to increased levels of indoor air pollutants, and may adversely affect the health of occupants. BPA's current and past new homes programs maintained ventilation rates comparable to those found in current practice homes by requiring balanced mechanical ventilation. BPA now proposes to give builders and consumers more flexibility by increasing the options for protecting indoor air quality in its new homes programs. This proposal is the impetus for this Environmental Impact Statement (EIS), which was prepared for BPA by Pacific Northwest Laboratory. BPS is preparing this EIS to assess whether other techniques maintain indoor air quality comparable to that found in homes built using current practices. Although many pollutants are potentially of great concern, our analysis concentrates on radon and formaldehyde. It is based on measured concentrations of these pollutants and measured ventilation rates in current practice. Ventilation was measured using fan pressurization tests, which measure only air leakage, and perfluorocarbon tracer gas (PFT) tests, which account for ventilation from mechanical devices and occupant behavior in addition to air leakage. These tests yielded two different estimates. We used these data to estimate pollutant concentrations and lifetime cancer rates under three alternative actions. Under all of the alternatives, radon had a much greater effect than formaldehyde. 102 refs

  7. Power Subscription Strategy: Administrator`s Record of Decision.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1998-12-01

    The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

  8. 77 FR 58984 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2012-09-25

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... at the following Internet address: http://www.bpa.gov/corporate/business/bpi . Copies of...

  9. 76 FR 63290 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2011-10-12

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... at the following Internet address: http://www.bpa.gov/corporate/business/bpi . Copies of...

  10. 78 FR 57372 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2013-09-18

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... at the following Internet address: http://www.bpa.gov/corporate/business/bpi . Copies of...

  11. Evaluation of Bonneville`s 1988 and 1989 Residential Weatherization Program: A Northwest study of program dynamics

    Energy Technology Data Exchange (ETDEWEB)

    Brown, M.A.; White, D.L.

    1992-12-01

    This study continues the series of evaluations of the Bonneville Power Administration`s long-term Residential Weatherization Program (RWP) by examining the energy saved by its 1988 and 1989 participants. The sample of participants for this study was drawn from 10 utilities covering the region`s three climate zones. Six of these utilities were included in the 1988 RWP evaluation, and eight of them were included in the 1989 RWP evaluation. This study analyzes data on 356 participating households in 1988, 433 participants in 1989, and a comparison group of 1170 nonparticipants in 1988 and 1466 in 1989. Previous evaluations of Bonneville`s earlier weatherization programs provide an historic context for analyzing program dynamics.

  12. Process evaluation of the Bonneville Power Administration Residential Weatherization Pilot Program

    Energy Technology Data Exchange (ETDEWEB)

    Lerman, D.I.; Bronfman, B.H.; Tonn, B.

    1983-10-01

    An evaluation of the BPA Residential Weatherization Pilot Program is described. Data for this report were gathered at the eleven public utilities participating in the program, at the BPA area and district offices serving these utilities, and at BPA headquarters. This process evaluation of the Pilot Program documents the history of the program, outlines the implementation strategies adopted by the Pilot utilities, describes the role of the BPA area and district offices in the program, and indicates what was learned by BPA and the utilities in the period the program operated.

  13. Bonneville Power Administration, Lower Columbia Region: Noxious Weed Management, 1996 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration, Portland, OR; Oregon Department of Agriculture Noxious Weed Control Program

    1996-01-01

    During the 1996 season ODA executed the contract between BPA and ODA. Execution of this contract included the following activities: Survey for target noxious weeds, such as Gorse; collection and redistribution of biological control agents, for example, Apion seed weevils for Scotch broom, bioagents for diffuse and spotted knapweed, Gorse spider mite, and gall fly releases for control of Canada thistle and bull thistle; and control of isolated infestations of Gorse on BPA rights-of-way. Training was provided for line crews at the Chemawa, Alevy and North Bend districts. The purpose of the program is to assist BPA in the integrated prevention and control of noxious weed species on BPA transmission line maintenance right-of-ways.

  14. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  15. Environmental Assessment for power marketing policy for Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Southwestern Power Administration (Southwestern) needs to renew expiring power sales contracts with new term (10 year) sales contracts. The existing contracts have been in place for several years and many will expire over the next ten years. Southwestern completed an Environmental Assessment on the existing power allocation in June, 1979 (a copy of the EA is attached), and there are no proposed additions of any major new generation resources, service to discrete major new loads, or major changes in operating parameters, beyond those included in the existing power allocation. Impacts from a no action plan, proposed alternative, and market power for less than 10 years are described.

  16. Environmental Assessment for power marketing policy for Southwestern Power Administration

    International Nuclear Information System (INIS)

    Southwestern Power Administration (Southwestern) needs to renew expiring power sales contracts with new term (10 year) sales contracts. The existing contracts have been in place for several years and many will expire over the next ten years. Southwestern completed an Environmental Assessment on the existing power allocation in June, 1979 (a copy of the EA is attached), and there are no proposed additions of any major new generation resources, service to discrete major new loads, or major changes in operating parameters, beyond those included in the existing power allocation. Impacts from a no action plan, proposed alternative, and market power for less than 10 years are described

  17. 78 FR 63177 - Order on Voluntary Remand and Clarifying Policy on Filing of Reactive Power Service Rate...

    Science.gov (United States)

    2013-10-23

    ... Generation Sources Service (reactive power) to the Bonneville Power Administration (Bonneville or BPA) is a....'' \\5\\ The Commission stated that ``Chehalis has been providing reactive power to BPA pursuant to an... interconnection agreement between Chehalis and BPA was required to be filed prior to May 2005, even though it...

  18. Southeastern Power Administration 2007 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  19. Southwestern Power Administration Annual Report 2012

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  20. Southwestern Power Administration Annual Report 2011

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-04-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  1. Southwestern Power Administration Annual Report 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-09-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  2. Southeastern Power Administration 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  3. Western Area Power Administration customer database

    Energy Technology Data Exchange (ETDEWEB)

    Sandahl, L.J.; Lee, A.D.; Wright, G.A.; Durfee, D.L.

    1993-05-01

    This report describes a comprehensive customer database compiled by the Pacific Northwest Laboratory (PNL) to assist with analyses conducted as part of the Western Area Power Administration Energy Planning and Management Program Environmental Impact Statement (EIS). The database was used by PNL as a tool to help select a sample of Western customers for potential participation in the Organizational Impacts Analysis case studies, and was used as part of the Utility Impact Analysis to identify sources and costs of auxiliary power. Secondary information sources were used predominantly to compile one year of system related information on the Western customers (over 600) included in the database. This information was useful for its intended purposes; however, year-to-year information may not be consistent across utilities and not all information was available for each utility.

  4. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

  5. 77 FR 26001 - Southwest Power Pool; Western Area Power Administration; Basin Electric Cooperative; Heartland...

    Science.gov (United States)

    2012-05-02

    ... Energy Regulatory Commission Southwest Power Pool; Western Area Power Administration; Basin Electric Cooperative; Heartland Consumers Power District; Notice of Petition for Declaratory Order Take notice that on... Administration (Western), Basin Electric Power Cooperative (Basin Electric), and Heartland Consumers...

  6. Southwestern Power Administration Annual Report 2008

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  7. Southeastern Power Administration 2012 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast. Sincerely, Kenneth E. Legg Administrator

  8. Southwestern Power Administration Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-01-01

    “Renewable energy” isn’t just a catchphrase at Southwestern Power Administration (Southwestern). It describes the hydroelectric energy we market, and the energy that Southwestern’s employees bring to work every day, constantly challenging themselves to become more eff ective and effi cient in providing aff ordable, environmentally clean power to the American people. As Southwestern’s new Administrator, I have had the opportunity to view our operations from a fresh perspective, and I’m proud to share with you how a focus on continual improvement has been evident in accomplishments throughout the agency during fi scal year (FY) 2007. When the North American Electric Reliability Corporation (NERC) implemented new reliability standards, we met applicable implementation dates and exceeded NERC’s control performance standards throughout the year. When tasked with reducing the agency’s carbon footprint, we found ways to achieve an 8.7% reduction in energy intensity from last year without impacting our operational capabilities. And when faced with record-breaking infl ows into the reservoir projects from which we market power, we capitalized on the opportunity to provide customers with signifi cant quantities of supplemental energy. Our supplemental sales this year not only saved customers over $122 million, but increased Southwestern’s revenues -- a huge win-win for Southwestern’s ratepayers and the Nation’s taxpayers alike. Southwestern is proud of its role in protecting National and economic security by contributing to the diverse supply of domestically produced energy, operating and maintaining a safe and reliable transmission system, and ensuring good stewardship of our Nation’s water resources and environment. In FY 2007, Southwestern continued to repay all power costs to the American taxpayers by marketing and delivering approximately 5.6 billion kilowatthours of hydropower at cost-based rates to customers in our six-state region. This energy

  9. Environmental Audit of the Alaska Power Administration

    International Nuclear Information System (INIS)

    This report documents the results of the Comprehensive Baseline Environmental Audit of the Alaska Power Administration (APA) headquartered in Juneau, Alaska. This Audit was conducted by the US Department of Energy's (DOE's) Office of Environmental Audit (EH-24) from August 24 to December 8, 1992. The scope of the Audit was comprehensive, covering all environmental programs and activities with the exception of those relating to the National Environmental Policy Act (NEPA). Specifically considered was the compliance status of APA regarding Federal, state, and local statutes and regulations, DOE Orders and Directives, and best management practices. The technical disciplines addressed by the Audit were: air, surface water/drinking water, groundwater, waste management, toxic and chemical materials, quality assurance, inactive waste sites, and environmental management. Due to the nature of the activities carried out at the two Federal hydroelectric projects operated by APA, the area of radiation was not investigated during the Audit

  10. Western Area Power Administration. Combined power system financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-26

    This report presents the results of the independent certified public accountants` audit of the Western Area Power Administration`s combined power system statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Westerns internal control structure disclosed three new reportable conditions concerning the lack of: (1) a reconciliation of stores inventory from subsidiary ledgers to summary financial information, (2) communication of interest during construction and related adjustments to interest on Federal investment, and (3) a system to prevent and detect power billing errors. None of the conditions were considered to be material weaknesses. Western provided concurrence and corrective action plans. The auditors` report on Western`s compliance with laws and regulations also disclosed two new instances of noncompliance. Western failed to calculate nonreimbursable expenses in accordance with the Grand Canyon Protection Act and had an unexplained difference in gross Federal investment balances used to calculate interest on Federal investment. Western provided concurrence and corrective action plans for the instances.

  11. Impacts of Western Area Power Administration`s power marketing alternatives on electric utility systems

    Energy Technology Data Exchange (ETDEWEB)

    Veselka, T.D.; Portante, E.C.; Koritarov, V. [and others

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration`s Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western`s Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated.

  12. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead Evaluation Volume II - Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, W.M.

    1995-01-01

    This report included the appendices for 1992-1993 Bonneville appliance efficiency program: showerhead evaluation. It consists of nine appendices, titled: Bonneville documents; overview of research projects; Puget Power and Light persistence study; hot-water flow analyses and assumptions documentation; regional end-use metering program; showerhead and faucet aerator performance assessment; Bonneville showerhead program distribution methods by participating utility; water- and energy-saving measure distribution methods literature review; REMP study load shape results.

  13. Environmental Management Audit: Southwestern Power Administration (Southwestern)

    International Nuclear Information System (INIS)

    This report documents the results of the Environmental Management Audit completed for the Southwestern Power Administration. During this Audit, activities and records were reviewed and personnel interviewed. The onsite portion of the Southwestern Audit was conducted from November 30 through December 11, 1992, by the US Department of Energy's Office of Environmental Audit (EH-24). EH-24 carries out independent assessments of Department of Energy (DOE) facilities and activities as part of the Assistant Secretary's Environmental Audit Program. This program is designed to evaluate the status of DOE facilities/activities regarding compliance with laws, regulations, DOE Orders, formal written procedures, compliance agreements, and Best Management Practices (BMPs). This internal oversight function plays an important role in improving the compliance status of DOE operations. The Environmental Management Audit stresses DOE's policy that it is the responsibility of line management to conduct operations in an environmentally sound and safe manner. The Environmental Management Audit focuses on management systems and programs, whereas the Environmental Baseline Audit conducted in March 1991 focused on specific compliance issues. The scope of the Southwestern Environmental Management Audit included a review of all systems and functions necessary for effective environmental management. Specific areas of review included: Organizational Structure; Environmental Commitment; Environmental Protection Programs; Formality of Environmental Programs; Internal and External Communication; Staff Resources, Training, and Development; and Program Evaluation, Reporting, and Corrective Action

  14. 75 FR 65624 - Southeastern Power Administration; Notice of Filing

    Science.gov (United States)

    2010-10-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southeastern Power Administration; Notice of Filing October 19, 2010. Take... Southeastern Power Administration (Southeastern) Rate Order No. SEPA- 53, for the sale of power...

  15. 75 FR 65624 - Western Area Power Administration; Notice of Filing

    Science.gov (United States)

    2010-10-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing October 19, 2010. Take notice that on September 30, 2010, Western Area Power Administration submitted a tariff filing...

  16. 76 FR 58805 - Western Area Power Administration; Notice of Filing

    Science.gov (United States)

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Area Power Administration; Notice of Filing Take notice that on September 7, 2011, the Western Area Power Administration submitted its Rate Order No. WAPA-156,...

  17. Evaluation of Bonneville's 1988 and 1989 Residential Weatherization Program: A Northwest study of program dynamics

    Energy Technology Data Exchange (ETDEWEB)

    Brown, M.A.; White, D.L.

    1992-12-01

    This study continues the series of evaluations of the Bonneville Power Administration's long-term Residential Weatherization Program (RWP) by examining the energy saved by its 1988 and 1989 participants. The sample of participants for this study was drawn from 10 utilities covering the region's three climate zones. Six of these utilities were included in the 1988 RWP evaluation, and eight of them were included in the 1989 RWP evaluation. This study analyzes data on 356 participating households in 1988, 433 participants in 1989, and a comparison group of 1170 nonparticipants in 1988 and 1466 in 1989. Previous evaluations of Bonneville's earlier weatherization programs provide an historic context for analyzing program dynamics.

  18. Southeastern Power Administration 2011 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-31

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to

  19. Southwestern Power Administration Update, October- December 2004

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-12-01

    On October 29, 2004, Southwestern and Southwest Power Pool, Inc. (SPP) reached agreement on interim arrangements to be implemented after the October 31, 2004, expiration of the membership agreement between the two parties. According to Jim McDonald, Director of Southwestern’s Division of Customer Service, the interim agreement forged between Southwestern and SPP seeks to minimize impacts to SPP as well as to Southwestern and its customers while Southwestern and SPP work on a seams/coordination agreement to succeed the expired membership agreement.

  20. The energy behind the power. Southwestern Power Administration 1994 annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This is the Southwestern Power Administration 1994 annual report. The topics of the report include a letter to the secretary; an overview including the mission statement, a description of the Southwestern Federal Power System, financial statement, performance measurements, national performance review; year in review, summary of results, financial and statistical data and the Southwestern Power Administration Organization.

  1. 2012 Annual Report [WESTERN AREA POWER ADMINISTRATION

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

  2. Network wind power over the Pacific Northwest

    Energy Technology Data Exchange (ETDEWEB)

    Hewson, E W; Baker, R W; Barber, D A; Peterson, B

    1978-09-01

    Since 1975 the Bonneville Power Administration (BPA) has been sponsoring wind power research at Oregon State University. A feasibility study that initially concentrated on the wind power potential in the Columbia River Gorge has expanded to the BPA service area which covers Washington, Oregon, Idaho, western Montana and northern Nevada. Previous BPA reports have documented the progress of this research.

  3. Electricity savings among participants three years after weatherization in Bonneville's 1986 residential weatherization program

    Energy Technology Data Exchange (ETDEWEB)

    White, D.L.; Brown, M.A.

    1990-09-01

    To ensure proper assessment of its weatherization activities, the Bonneville Power Administration (Bonneville) has examined several cohorts of participants in various phases of its Long-Term Residential Weatherization Program (Long-Term RWP). Beginning in 1980, energy savings one, two, and three years after program participation have been evaluated. This study, which continues the series of Bonneville's ongoing evaluation of weatherization activities, examines electricity savings three years after weatherization in the 1986 Long-Term RWP. Electricity bills were weather-adjusted using the Princeton Scorekeeping Method (PRISM). Normalized Annual Consumption (NAC) was calculated for each participant and control household for which data were available. Gross energy savings were calculated by subtracting a household's NAC for each postretrofit year (1986--87, 1986--88, and 1988--89) from its preretrofit NAC (1985--86). Household level data were aggregated and examined at the utility level allowing the calculation of average net savings, which is the difference between gross savings by nonparticipants and participants. Utility-level data were then weighted, based on the extent of each utility's participation in the Long-Term RWP in 1986, to allow the identification of overall program savings. 29 refs., 5 figs., 14 tabs.

  4. Southwestern Power Administration annual site environmental report CY 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    This report provides a synopsis of Southwestern Power Administration`s (Southwestern`s) effectiveness in managing its operations in an environmentally responsible manner. In CY 1997, the Office of Environmental, Safety, and Health was reorganized and incorporated into the Division of Acquisition and Property. The Division of Acquisition, Property, and Environmental Management maintains responsibility for development, oversight, and implementation of environmental programs. Senior Management at Southwestern has taken actions to increase environmental awareness throughout the organization. During CY 1997, (Southwestern) was not involved in any known programs or activities that had adverse impacts on the environment. The 1997 Environmental Appraisal, a portion of Southwestern`s Self-Assessment and Appraisal Program, indicated approximately 90% compliance with Southwestern`s written environmental programs. Southwestern continued to function throughout CY 1997 in an operations and maintenance posture with minor substation projects.

  5. Seven Global Goals. 2013 annual report, Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    For over 70 years, Southwestern has marketed and delivered reliable, renewable, and affordable hydropower, partnering with Federal power stakeholders and others in the industry to make sure the lights stay on. This kind of effective, efficient, and cost conscious operation is made possible only by hard work and dedication. Southwestern employees work individually and as a team to meet seven comprehensive agency goals that touch on all aspects of the agency’s operations. Dubbed the “Seven Global Goals” by Administrator Chris Turner, these objectives identify specific, measurable targets that support Southwestern’s mission and reinforce its responsibilities toward its customers and the Nation.

  6. Annual Report to the Bonneville Power Administration, Reporting Period: April 2008 - February 2009 [re: "Survival and Growth in the Columbia River Plume and north California Current"].

    Energy Technology Data Exchange (ETDEWEB)

    Northwest Fisheries Science Center, NOAA Fisheries; Cooperative Institute for Marine Resources Studies, Oregon State University; OGI School of Science & Engineering, Oregon Health Sciences University.

    2009-07-17

    We have made substantial progress toward our objectives outlined in our BPA supported proposal entitled 'Columbia River Basin Juvenile Salmonids: Survival and Growth in the Columbia River Plume and northern California Current' which we report on herein. During 2008, we were able to successfully conduct 3 mesoscale cruises. We also were able to conduct 7 biweekly predator cruises, along with substantial shore-based visual observations of seabirds. Detailed results of the mesoscale cruises are available in the Cruise Reports and summarized in the next section. We have taken a proactive approach to getting the results of our research to fisheries managers and the general public. We have begun to make annual predictions based on ocean conditions of the relative survival of juvenile coho and Chinook salmon well before they return as adults. This is based on both biological and physical indicators that we measure during our surveys or collect from outside data sources. Examples of our predictions for 2009 and 2010 are available on the following web site: http://www.nwfsc.noaa.gov/research/divisions/fed/oeip/a-ecinhome.cfm.

  7. Western Area Power Administration combined power system financial statements, 30 September 1995 and 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The attached report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on Western`s 1995 statements. Their reports on Western`s internal control structure and on compliance with laws and regulations are also provided.

  8. Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Allison, T.; Griffes, P.; Edwards, B.K.

    1995-03-01

    This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

  9. Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju [Pacific Northwest National Laboratory

    2008-08-08

    From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the

  10. 30 CFR 44.22 - Administrative law judges; powers and duties.

    Science.gov (United States)

    2010-07-01

    ... hearing, may file with the Chief Administrative Law Judge of the Department of Labor a motion to be... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Administrative law judges; powers and duties... MANDATORY SAFETY STANDARDS Hearings § 44.22 Administrative law judges; powers and duties. (a) Powers....

  11. Southwestern Power Administration Combined Financial Statements, 2006-2009

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-09-01

    We have audited the accompanying combined balance sheets of the Southwestern Federal Power System (SWFPS), as of September 30, 2009, 2008, 2007, and 2006, and the related combined statements of revenues and expenses, changes in capitalization, and cash flows for the years then ended. As described in note 1(a), the combined financial statement presentation includes the hydroelectric generation functions of another Federal agency (hereinafter referred to as the generating agency), for which Southwestern Power Administration (Southwestern) markets and transmits power. These combined financial statements are the responsibility of the management of Southwestern and the generating agency. Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the combined financial statements are free of material misstatement. An audit includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of Southwestern and the generating agency’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the combined financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall combined financial statement presentation. We believe that our audits provide a reasonable basis for our opinion. In our opinion, the combined financial statements referred to above present fairly, in all material respects, the respective financial position of the Southwestern Federal Power

  12. Keeping current, June 1998. Issues 98: Securing the value of the federal Columbia River power system

    International Nuclear Information System (INIS)

    This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management

  13. Air quality analysis for the Western Area Power Administration's 2004 Power Marketing Plan Environmental Impact Statement

    International Nuclear Information System (INIS)

    The Western Area Power Administration (Western) markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of firm power (plus 100 MW of seasonal peaking capacity) from the Central Valley Project (CVP) and other resources. Western's mission is to sell and deliver electricity generated from these resources. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Further, Western's hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by other regulatory agencies. The Sierra Nevada Region proposes to develop a marketing plan that defines the products and services it would offer beyond the year 2004 and the eligibility and allocation criteria for its electric power resources. Because determining levels of long-term firm power resources to be marketed and subsequently entering into contracts for the delivery of related products and services could be a major Federal action with potentially significant impacts to the human environment, the 2004 Power Marketing Plan Environmental Impact Statement (2004 EIS) is being prepared. Decisions made by the Sierra Nevada Region on how and when to supply power to its customers would influence the operation of power plants within the Western Systems Coordinating Council (WSCC). If the resources affected are thermal resources, this could in turn affect the amount, timing, and location of pollutant emissions to the air at locations throughout the western United States. This report has been produced in conjunction with the 2004 EIS to provide a more detailed discussion of the air quality implications of the 2004 power marketing plan

  14. Impacts of Western Area Power Administration's power marketing alternatives on electric utility systems

    International Nuclear Information System (INIS)

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration's Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western's Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated

  15. Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN

    International Nuclear Information System (INIS)

    The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG ampersand E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it's new marketing plan

  16. 78 FR 65641 - Recommendation From the Western Area Power Administration To Pursue Regional Transmission...

    Science.gov (United States)

    2013-11-01

    ... Area Power Administration, 2900 4th Avenue North, Billings, MT 59101-1266. FOR FURTHER INFORMATION... Administration, 2900 4th Avenue North, Billings, MT 59101-1266, telephone (406) 255- 2910, email sundsted@wapa....gov/ugp/Environment/default.htm . Dated: October 29, 2013. Mark A. Gabriel, Administrator....

  17. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  18. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  19. Bonneville - Hood River Vegetation Management Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  20. Bonneville Project: CFD of the Spillway Tailrace

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2012-11-19

    US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

  1. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  2. Southwestern Power Administration Annual Report 2004-2006

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-01-01

    Confidence Commitment Cooperation These are words that spring to mind regarding Southwestern Power Administration’s performance during fiscal years (FY) 2004-2006 By offering innovative, customer-oriented service, working to improve system reliability and efficiency, and partnering with customers and other Federal power stakeholders, Southwestern has certainly exhibited all three of these qualities during these challenging yet productive years In fact, our cooperative working relationships were critical to our success during the severe and widespread drought conditions which prevailed throughout Southwestern’s marketing area for much of 2005-2006 When we proposed a temporary energy deferral program, our customers came on board by voluntarily taking less Federal hydropower than they were entitled to, enabling us to preserve system storage and fulfill our contract obligations during the crucial summer months of 2006 The U S Army Corps of Engineers (Corps) also helped improve our drought situation by allowing Southwestern more operational flexibility on a regional level Despite the challenges this critical drought period presented, Southwestern remained committed to fulfilling our mission and strategic goals From FY 2004 through FY 2006, we marketed and delivered all available Federal hydropower while meeting and even exceeding the reliability standards of the North American Electric Reliability Corporation (NERC) Our Power Operations Training Center in Springfield, Missouri, was cited as an “Example of Excellence” during a NERC readiness audit in October 2006; and as we have every year since NERC began measuring, Southwestern far exceeded the accepted NERC compliance ratings for power system operations reliability Our commitment to excellence and accountability has kept our repayment goals on target as well Revenues were sufficient to repay all annual expenses and the required principal investment in the Federal hydropower facilities Furthermore, the original

  3. Impacts of Western Area Power Administration`s power marketing alternatives on retail electricity rates and utility financial viability

    Energy Technology Data Exchange (ETDEWEB)

    Bodmer, E.; Fisher, R.E.; Hemphill, R.C.

    1995-03-01

    Changes in power contract terms for customers of Western`s Salt Lake City Area Office affect electricity rates for consumers of electric power in Arizona, Colorado, Nevada, New Mexico, Utah, and Wyoming. The impacts of electricity rate changes on consumers are studied by measuring impacts on the rates charged by individual utility systems, determining the average rates in regional areas, and conducting a detailed rate analysis of representative utility systems. The primary focus is an evaluation of the way retail electricity rates for Western`s preference customers vary with alternative pricing and power quantity commitment terms under Western`s long-term contracts to sell power (marketing programs). Retail rate impacts are emphasized because changes in the price of electricity are the most direct economic effect on businesses and residences arising from different Western contractual and operational policies. Retail rates are the mechanism by which changes in cost associated with Western`s contract terms are imposed on ultimate consumers, and rate changes determine the dollar level of payments for electric power incurred by the affected consumers. 41 figs., 9 tabs.

  4. 2014 annual site environmental report, Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-12-31

    Southwestern Power Administration’s Annual Site Environmental Report (ASER) serves as the chief reporting mechanism for site environmental performance information within the Department of Energy and as a valuable resource for shared and collaborative environmental protection and performance information to Agency stakeholders and members of the public living near Southwestern Power Administration’s (Southwestern) facilities and transmission line rights-of-ways. This ASER meets the requirements of Department of Energy (DOE) Order 231.B. Southwestern’s key environmental involvement includes an emphasis on the protection of ecological resources which is effectively accomplished through environmental program elements such as protecting water resources, generation of clean hydropower energy, oil spill prevention practices, elimination of green-house gas emissions, and comprehensive project reviews to ensure the protection of living organisms, migratory birds, Federally threatened or endangered species, and historic or cultural resources. Southwestern continues to actively minimize effects to natural resources and strive for continual improvement in the area of environmental compliance and sustainability while achieving the agency mission to market and deliver Federal hydroelectric power.

  5. Relationship between School Administrators' Organizational Power Sources and Teachers' Organizational Citizenship Behaviors

    Science.gov (United States)

    Altinkurt, Yahya; Yilmaz, Kursad

    2012-01-01

    The main purpose of the research was to determine correlation between school administrators' organizational power sources and teachers' organizational citizenship behaviors in primary schools. The research was a correlational survey model study. 275 participants were randomly chosen for the research. The data were collected by "Administrators'…

  6. Exploring Paradoxes of Power in Small College Writing Administration Composition Studies

    Science.gov (United States)

    Jones, Libby Falk

    2004-01-01

    Drawing on concepts and practices from the fields of communication, conflict management, leadership, and feminist theory, as well as on her experience as a teacher-administrator, the author explores perceptions, sources, and consequences of power. She argues that effective small college writing administrators must understand the availability of…

  7. Administration

    DEFF Research Database (Denmark)

    Bogen handler om den praksis, vi kalder administration. Vi er i den offentlige sektor i Danmark hos kontorfolkene med deres sagsmapper, computere, telefoner,, lovsamlinger,, retningslinier og regneark. I bogen udfoldes en mangfoldighed af konkrete historier om det administrative arbejde fra...... forskellige områder i den offentlige sektor. Hensigten er at forstå den praksis og faglighed der knytter sig til det administrative arbejde...

  8. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  9. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  10. 1998-1999 evaluation of fall chinook and chum salmon spawning below Bonneville, The Dalles, John Day and McNary dams

    International Nuclear Information System (INIS)

    This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6

  11. Outline of Nuclear Power Training Center of the Tomari Administration Office

    International Nuclear Information System (INIS)

    At the Nuclear Power Training Center of the Tomari Administration Office of Hokkaido Electric Power Co., Inc. (NTC), maintenance technicians, plant operators, and other technical staff are receiving practical training in order to ensure adequate availability of properly trained technical staff for safe and stable operation of the Tomari Nuclear Power Station. The training program at NTC commenced in October, 1993. This paper describes special features of the training facilities, course matter, and the results of instruction given during fiscal, 1994. (author)

  12. Western Area Power Administration combined power system financial statements September 30, 1994 and 1993 and management overview and performance measurements

    Energy Technology Data Exchange (ETDEWEB)

    Marwick, P.

    1994-12-31

    The attached report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1994. The auditors have expressed an unqualified opinion on Western`s 1994 statements. Their reports on Western`s internal control structure and on compliance with laws and regulations are also provided. Western was established in December 1977, and has the responsibility for the Federal electric power marketing and transmission functions in 15 central and western states. Western markets power, as required by existing law, at the lowest possible rates consistent with sound business principles to recover the costs of operation and capital invested in power facilities.

  13. A Statistical Approach to Planning Reserved Electric Power for Railway Infrastructure Administration

    OpenAIRE

    M. Brabec; Pelikán, E. (Emil); Konár, O. (Ondřej); Kasanický, I.; Juruš, P. (Pavel); Sadil, J.; Blažek, P.

    2013-01-01

    One of the requirements on railway infrastructure administration is to provide electricity for day-to-day operation of railways. We propose a statistically based approach for the estimation of maximum 15-minute power within a calendar month for a given region. This quantity serves as a basis of contracts between railway infrastructure administration and electricity distribution system operator. We show that optimization of the prediction is possible, based on underlying loss function deriv...

  14. On Administrative Prosecutorial Power%论行政检察权

    Institute of Scientific and Technical Information of China (English)

    李小东

    2014-01-01

    目前,我国学术界对行政检察权的界定大多停留在检察机关对行政诉讼所实施的监督方面,缺少了对行政行为的监督的界定。既然检察机关是宪法所规定的法定的法律监督机关,那么行政检察权就应当包含对行政诉讼和行政行为的监督,对行政行为的监督主要体现为提起行政诉讼。这一方面是履行检察机关的法律监督职能,另一方面能够更好的保护行政相对人的合法权益,有利于加强对行政行为的检察监督,也有利于增强行政执法的公信力。%At present,the academic definitions of administrative prosecutorial power mostly stay in the prosecutorial supervision over the implementation of the administrative proceedings,without the consideration of the definition of administrative action supervision. Since prosecutors are statutory legal supervisory authority by the Constitution, then the administrative supervision of prosecutorial power should contain administrative proceedings and administra-tive acts,supervision of administrative acts mainly as administrative proceedings. This aspect is to perform legal su-pervision prosecution,as well as to better protect the legitimate rights and interests administrative counterpart. It is conducive to strengthen the prosecutorial supervision of administrative acts,and to enhance the credibility of law enforcement.

  15. Revised Environmental Assessment for the Sacramento Area Office Western Area Power Administration, 1994 Power Marketing Plan

    International Nuclear Information System (INIS)

    This document presents information on power marketing; expiring contracts; economic methods and assumptions; detailed power supply cost data; guidelines and acceptance criteria for conservation and renewable energy projects; hourly flow impacts graphs; difference in hydro dispatch; generation data; flow data; fishery resources of the Sacramento River; and water quality

  16. Administrative Court of Munich, judgement of June 26, 1985 (security of nuclear power plants)

    International Nuclear Information System (INIS)

    The decision of the Administrative Court of Munich is dealing with the protection of the nuclear power station of Isar I in Ohu. The use of shotguns for the protection of objects and persons ouside of private properties is a danger for public security. Consequently shotguns are not qualified for the protection of nuclear power stations (sec. 7 para. 2 No. 5 of the Atomic Energy Act). (CW)

  17. 76 FR 15221 - Organization and Delegation of Powers and Duties; Assistant Secretary for Administration

    Science.gov (United States)

    2011-03-21

    ... and Procedures (44 FR 11034). There are no costs associated with this rule. B. Executive Order 13132... 49 CFR Part 1 RIN 9991-AA56 Organization and Delegation of Powers and Duties; Assistant Secretary for Administration AGENCY: Office of the Secretary of Transportation. ACTION: Final rule. SUMMARY: This...

  18. The Prediction Power of Servant and Ethical Leadership Behaviours of Administrators on Teachers' Job Satisfaction

    Science.gov (United States)

    Güngör, Semra Kiranli

    2016-01-01

    The purpose of this study is to identify servant leadership and ethical leadership behaviors of administrators and the prediction power of these behaviors on teachers' job satisfaction according to the views of schoolteachers. This research, figured in accordance with the quantitative research processes. The target population of the research has…

  19. 75 FR 17913 - Maintenance and Vegetation Management Along Existing Western Area Power Administration...

    Science.gov (United States)

    2010-04-08

    ... the transmission lines from vegetation- caused interference with the maintenance and operation of the... vegetation that, at mature height, presents a risk to transmission line maintenance and operation, and allow... Management Along Existing Western Area Power Administration Transmission Line Rights of Way on...

  20. 78 FR 9936 - Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program...

    Science.gov (United States)

    2013-02-12

    ..., 2011, HUD published a notice at 76 FR 17936 that announced HUD's FHA Home Energy Retrofit Loan Pilot... URBAN DEVELOPMENT Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Pilot Program AGENCY: Office of the Assistant Secretary for Housing--Federal...

  1. Impacts on irrigated agriculture of changes in electricity costs resulting from Western Area Power Administration's power marketing alternatives

    International Nuclear Information System (INIS)

    Irrigation is a major factor in the growth of US agricultural productivity, especially in western states, which account for more than 85% of the nation's irrigated acreage. In some of these states, almost all cropland is irrigated, and nearly 50% of the irrigation is done with electrically powered pumps. Therefore, even small increases in the cost of electricity could have a disproportionate impact on irrigated agriculture. This technical memorandum examines the impacts that could result from proposed changes in the power marketing programs of the Western Area Power Administration's Salt Lake City Area Office. The changes could increase the cost of power to all Western customers, including rural municipalities and irrigation districts that rely on inexpensive federal power to pump water. The impacts are assessed by translating changes in Western's wholesale power rate into changes in the cost of pumping water as an input for agricultural production. Farmers can adapt to higher electricity prices in many ways, such as (1) using different pumping fuels, (2) adding workers and increasing management to irrigate more efficiently, and (3) growing more drought-tolerant crops. This study projects several responses, including using less groundwater and planting fewer waterintensive crops. The study finds that when dependence on Western's power is high, the cost of power can have a major effect on energy use, agricultural practices, and the distribution of planted acreage. The biggest percentage changes in farm income would occur (1) in Nevada and Utah (however, all projected changes are less than 2% of the baseline) and (2) under the marketing alternatives that represent the lowest capacity and energy offer considered in Western's Electric Power Marketing Environmental Impact Statement. The aggregate impact on farm incomes and the value of total farm production would be much smaller than that suggested by the changes in water use and planted acreage

  2. State, power, administration: Marxist and Foucauldian perspectives on state development in Britain, 1832-1918

    OpenAIRE

    Neocleous, Mark

    1995-01-01

    This thesis seeks to contribute an original account of state power by reconceptualising the state-civil society distinction through the category of political administration. Through an analysis of the development of the state in Britain between 1832 and 1918 it seeks to show why such a reconceptualisation is necessary and the features which distinguish it from other accounts. This task is performed via an immanent critique of the work of Hegel, Marx and Foucault. It is argued that historical ...

  3. Alpha and beta EEG power reflects L-dopa acute administration in parkinsonian patients

    Science.gov (United States)

    Melgari, Jean-Marc; Curcio, Giuseppe; Mastrolilli, Francesca; Salomone, Gaetano; Trotta, Laura; Tombini, Mario; di Biase, Lazzaro; Scrascia, Federica; Fini, Rita; Fabrizio, Emma; Rossini, Paolo Maria; Vernieri, Fabrizio

    2014-01-01

    Aim: To evaluate the effect of an acute L-dopa administration on eye-closed resting state electroencephalographic (EEG) activity of cognitively preserved Parkinsonian patients. Methods: We examined 24 right-handed patients diagnosed as uncomplicated probable Parkinson’s disease (PD). Each patient underwent Unified Parkinson’s Disease Rating Scale (UPDRS)-part-III evaluation before and 60 min after an oral load of L-dopa-methyl-ester/carbidopa 250/25 mg. Resting condition eyes-closed EEG data were recorded both pre- and post L-dopa load. Absolute EEG power values were calculated at each scalp derivation for Delta, Theta, Alpha and Beta frequency bands. UPDRS scores (both global and subscale scores) and EEG data (power values of different frequency bands for each scalp derivation) were submitted to a statistical analysis to compare Pre and Post L-Dopa conditions. Finally, a correlation analysis was carried out between EEG spectral content and UPDRS scores. Results: Considering EEG power spectral analysis, no statistically significant differences arose on Delta and Theta bands after L-dopa intake. Conversely, Alpha and Beta rhythms significantly increased on centro-parietal scalp derivations, as a function of L-dopa administration. Correlation analysis indicated a significant negative correlation between Beta power increase on centro-parietal areas and UPDRS subscores (Rigidity of arms and Bradykinesia). A minor significant negative correlation was also found between Alpha band increase and resting tremor. Conclusions: Assuming that a significant change in EEG power spectrum after L-dopa intake may be related to dopaminergic mechanisms, our findings are consistent with the hypothesis that dopaminergic defective networks are implicated in cortical oscillatory abnormalities at rest in non-demented PD patients. PMID:25452725

  4. Alpha and beta EEG power reflects L-dopa acute administration in parkinsonian patients

    Directory of Open Access Journals (Sweden)

    Jean-Marc eMelgari

    2014-11-01

    Full Text Available Aim. To evaluate the effect of an acute L-dopa administration on eye-closed resting state electroencephalographic (EEG activity of cognitively preserved Parkinsonian patients. Methods. We examined 24 right-handed patients diagnosed as uncomplicated probable Parkinson’s disease (PD. Each patient underwent UPDRS-part-III evaluation before and 60 minutes after an oral load of L-dopa-methyl-ester/carbidopa 250/25 mg. Resting condition eyes-closed EEG data were recorded both pre- and post L-dopa load. Absolute EEG power values were calculated at each scalp derivation for Delta, Theta, Alpha and Beta frequency bands. UPDRS scores (both global and subscale scores and EEG data (power values of different frequency bands for each scalp derivation were submitted to a statistical analysis to compare Pre e Post L-Dopa conditions. Finally, a correlation analysis was carried out between EEG spectral content and UPDRS scores. Results. Considering EEG power spectral analysis, no statistically significant differences arose on Delta and Theta bands after L-dopa intake. Conversely, Alpha and Beta rhythms significantly increased on centro-parietal scalp derivations, as a function of L-dopa administration. Correlation analysis indicated a significant negative correlation between Beta power increase on centro-parietal areas and UPDRS subscores (Rigidity of arms and Bradykinesia. A minor significant negative correlation was also found between Alpha band increase and resting tremor. Conclusions. Assuming that a significant change in EEG power spectrum after L-dopa intake may be related to dopaminergic mechanisms, our findings are consistent with the hypothesis that dopaminergic defective networks are implicated in cortical oscillatory abnormalities at rest in non-demented PD patients.

  5. Legal control of discretionary powers in Ghana: lessons from English administrative law theory

    Directory of Open Access Journals (Sweden)

    K. B. Mensah

    1998-01-01

    Full Text Available This paper develops along the following line. First, we shall attempt to explain what discretion is, why it has become vety important in the modem administrative state, and the dangers that it poses in a democratic legal system. It then looks at the problems which have to be faced in justifying judicial review of discretion. It takes an in depth analysis of legal liberalism and functionalism. Aimed with these 'lenses', it attempts to explain the theoretical basis of two important Ghanaian cases, Re Akoto , and People's Popular Paity v Attorney General (PPP v AG'. It examines the provisions which regulate the use of discretionary powers in the Ghanaian 1993 Constitution and it looks at the choices we have to make from the various theories and the development of the administrative state in Ghana.

  6. Federal supervisory powers in administrative action on behalf of the Federal Government

    International Nuclear Information System (INIS)

    The Federal Government's authority to give instructions in matters of public administration pursuant to Art. 85 III GG has been gaining in significance over the last few years in the course of federal disputes about the licenses issued to the NUKEM company under atomic energy law, or about the licensing of the Kalkar fast breeder reactor. Proceeding from the above federal controversy about issues relating to atomic energy law, the author extends his study to the general constitutional level, investigating the provisions of the German constitution relating to the supervisory power and the authority to give instructions on the part of the Federal Government, and the rights and means of the Laender governments to defend their administrative rights. (orig.)

  7. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  8. Administrative competence of regions in connection with the establishment of power plants

    International Nuclear Information System (INIS)

    This paper which is divided into two parts, analyses the concept of competence underlying the regulations concerning the transfer of certain state duties to the regions. The author considers that this concept does not seem adaptable to the various functions the regions are required to discharge in the energy field. A description follows of the technical and administrative authority given to the regions in the licensing process for power-producing plants. The second part of the paper deals with recent regulations concerning energy conservation and development of alternative energy sources, in the context of regional competence. (NEA)

  9. Western Area Power Administration combined power system financial statements, September 30, 1996 and 1995 (with independent auditors` report thereon)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statements. The auditors` report on Western`s internal control structure disclosed two new reportable conditions and discussed the status of an unresolved condition from prior years. The new conditions involved the write-off of aging accounts receivable and the understatement of interest expense for inactive construction work orders. These reportable conditions are not considered to be material weaknesses. Western concurred with the audit recommendations and is responsible for necessary corrective actions. The auditors also considered the overview and performance measure data for completeness and material consistency with the basic financial statements as noted in the internal control report. The report also disclosed an additional reportable condition directed to the Bureau of Reclamation (Reclamation) which is not considered to be a material weakness. Reclamation concurred with the audit recommendation and is responsible for necessary corrective action. The auditors` report on Western`s compliance with laws and regulations disclosed two new instances of noncompliance involving interest charges on all construction costs funded with Federal appropriations and other capitalized costs. The report also discussed the status of one instance of noncompliance from prior years. Western provided concurrence and corrective action plans for all of these instances of noncompliance.

  10. On the Integration Theory of Academic Power and Administrative Power%学术权力与行政权力整合论析

    Institute of Scientific and Technical Information of China (English)

    高宏

    2011-01-01

    大学内部存在科层组织和学术组织两个组织体系,相应地产生了行政权力和学术权力。教育与文化的冲突、大学规模的不断扩大,加大了行政权力和学术权力之间的冲突。加强行政权力与学术权力的规范性建设,实施行政权力与学术权力适度交叉,拓宽民主决策、管理和监督渠道,充分发挥校长在两大权力系统中的枢纽作用,这些都是解决学术权力与行政权力矛盾与冲突问题的可行性措施,也是建立现代大学制度的关键。%There exist two organizational systems of bureaucratic organization and academic organization in the university itself. Correspondingly, it results in university's administrative power and academic power. The conflict of education and culture, the continuous expansion of university, increase the conflict of administrative power and academic power. Strengthening the normative construction of administrative power and academic power, properly playing the role of academic power, implementing the moderate cross of administrative power and academic power, broadening the democratic decision-making, management and supervision channels, giving full play to the pivotal role of principal in two power systems, they are the feasible measures to solve the contradiction and conflict of academic power and administrative power, but also the key to establishing a modern university system.

  11. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Science.gov (United States)

    2012-09-11

    ... Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427) AGENCY... Grapevine Canyon Wind Project was published in the Federal Register (77 FR 34041). After considering the... proposed wind park would be built in one or more phases, dependent on one or more power sale contracts....

  12. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  13. 论行政调查权的授予%On Empowerment of Administrative Investigation Power

    Institute of Scientific and Technical Information of China (English)

    汤俪瑾

    2012-01-01

      When regulating the empowerment of administrative investigation power the reality of China’s rule of administrative law and categorization should be taken into consideration as basis to distinguish discretionary investigation from mandatory investigation in order to mainly solve the problems of the application of the legal reservation principle and relation between general empowerment and specific empowerment. With regard to the legal reservation principle, mandatory empowerment should be applied to strictly but discretionary investigation not. With regard to general empowerment and specific empowerment, the former should be based on both the general empowerment by organic laws of administrative bodies and the specific empowerment by administrative behavior laws, while the later can be carried out under only the cooperation of the counterpart so long as administrative bodies are generally empowered in organic laws.%  规范行政调查权的授予,应当考虑我国的行政法治现实,以类型化为基础,区别任意性调查与强制性调查,主要解决法律保留原则的适用问题和概括授权与具体授权问题。关于法律保留原则,强制性调查必须严格适用;任意性调查无须苛责。关于概括授权与具体授权,强制性调查应当以行政机关组织法的概括授权为基础,再加上行政行为法的具体授权;任意性调查只要行政机关具有组织法上的概括职权,就可以在取得相对人配合的情况下实施。

  14. Pulsed Power Science and Technology: A Strategic Outlook for the National Nuclear Security Administration (Summary)

    Energy Technology Data Exchange (ETDEWEB)

    Sinars, Daniel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Scott, Kimberly Carole [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Edwards, M. John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Olson, Russell Teall [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-10-17

    Major advances in pulsed power technology and applications over the last twenty years have expanded the mission areas for pulsed power and created compelling new opportunities for the Stockpile Stewardship Program (SSP). This summary document is a forward look at the development of pulsed power science and technology (PPS&T) capabilities in support of the next 20 years of the SSP. This outlook was developed during a three month long tri-lab study on the future of PPS&T research and capabilities in support of applications to: (1) Dynamic Materials, (2) Thermonuclear Burn Physics and Inertial Confinement Fusion (ICF), and (3) Radiation Effects and Nuclear Survivability. It also considers necessary associated developments in next-generation codes and pulsed power technology as well as opportunities for academic, industry, and international engagement. The document identifies both imperatives and opportunities to address future SSP mission needs. This study was commissioned by the National Nuclear Security Administration (NNSA). A copy of the memo request is contained in the Appendix. NNSA guidance received during this study explicitly directed that it not be constrained by resource limitations and not attempt to prioritize its findings against plans and priorities in other areas of the national weapons program. That prioritization, including the relative balance amongst the three focus areas themselves, must of course occur before any action is taken on the observations presented herein. This unclassified summary document presents the principal imperatives and opportunities identified in each mission and supporting area during this study. Proceeding this area-specific outlook, we discuss a cross-cutting opportunity to increase the shot capacity on the Z pulsed power facility as a near term, cost effective way to broadly impact PPS&T for SSP as well as advancing the science and technology to inform future SSMP milestones over the next 5-10 years. The final page of the

  15. 14 CFR 406.109 - Administrative law judges-powers and limitations.

    Science.gov (United States)

    2010-01-01

    .... (1) The administrative law judge must file with the FDMS, or instruct the party to file with the FDMS... administrative law judge must file with the FDMS a copy of each ruling and order issued by the administrative law... administrative law judge may disqualify himself or herself at any time. A party may file a motion, pursuant...

  16. Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

    2010-04-01

    Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

  17. Income distribution impacts of changes in Western Area Power Administration electricity prices. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rose, A.; Frias, O. [Pennsylvania State Univ., University Park, PA (United States). Dept. of Mineral Economics

    1993-06-01

    The purpose of this report is to present the methodology and results of an analysis of income distribution impacts associated with changes in the Western Area Power Administration (WAPA) marketing program. The focus will be on the distribution of personal income across eleven brackets in each of nine sub-regions of the WAPA market area. Moreover, these results will be translated into an assessment of the number of people who stand to gain or lose as a result of the policies and the size of these income changes. Most economic impact analyses are performed at an aggregate level. The results are typically presented in terms of net benefits, or a listing of changes in employment, output, income, or prices. What is neglected is the distribution of impacts across the affected population. These distributional impacts are important for several reasons. First, there is the normative judgmental issue of distributional justice, or equity. This addresses concerns about income disparities in general, or whether the poor, or any other group, are shouldering a disproportionate share of any burden or are failing to share significantly in any gain.

  18. Above Bonneville passage and propagation cost effectiveness analysis

    International Nuclear Information System (INIS)

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region

  19. Alaska Power Administration federal power program financial statements with supplementary information September 30, 1993 and September 30, 1992 with auditors` reports thereon

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-14

    The mission of the Alaska Power Administration is to operate and maintain Alaska`s Federal hydroelectric generation and transmission facilities in an efficient, reliable, safe, and environmentally sensitive manner. The power from the facilities is marketed in a manner so as to repay their federal debt and provide widespread use of the power resources at the lowest cost to consumers consistent with sound business principles. This document presents fiscal 1993 accomplishments, future plans, results of operations, sales and revenues, expenses, debt service, repayment status, net cash flow, system reliability, and a report of independent accountants.

  20. Administrators' Power Usage Styles and Their Impact on the Organizational Culture in Colleges of Education: A Case Study

    Science.gov (United States)

    Ozcan, Kenan; Karatas, Ibrahim Hakan; Caglar, Çaglar; Polat, Murat

    2014-01-01

    The main purpose of this study is to determine how power usage styles of administrators of faculties of education influence the organizational culture in their respective faculties in Turkey. Using the phenomenological method, a qualitative research method, researchers studied a group comprised of 20 academics from 7 different colleges of…

  1. 75 FR 78730 - Federal Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot...

    Science.gov (United States)

    2010-12-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Federal Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit... Fund to enable HUD to catalyze innovations in the residential energy efficiency sector that have...

  2. Conceptions of Power among Senior Women Administrators at Liberal Arts Colleges in the Upper Midwestern United States

    Science.gov (United States)

    Enke, Kathryn

    2014-01-01

    Women are underrepresented in senior-level leadership positions in higher education institutions, and their experiences are underrepresented in research about leadership and power in higher education. This qualitative study engaged women senior administrators at liberal arts colleges in the Upper Midwestern United States to better understand how…

  3. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J. [Pacific Northwest Lab., Richland, WA (United States); Roybal, A.L. [Western Area Power Administration, Golden, CO (United States)

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  4. Western Area Power Administration annual site environmental report for calendar year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-12-31

    This document outlines the accomplishments and status of the environmental program of the Western Area Power Administration (Western) for calendar year 2005. In 2005, Western submitted 190 reports to state and local emergency response personnel and had 60 California Hazardous Materials Business Plans in place as required under the Emergency Planning and Community Right-to-Know Act. These reports identify the hazardous substances contained at these sites. At sites where potential oil spills could harm surrounding ecosystems and waterways, Western prepares Spill Prevention, Control, and Countermeasure (SPCC) plans. These plans identify measures to prevent spills from harming the environment, such as identifying the need for secondary containment at facilities. Western currently has SPCC plans for 154 facilities in 13 states. In 2005, Western updated 19 SPCC plans and prepared one new plan. Western operated under 107 environmental permits in 2005. Western evaluates the impact of its planned actions on the environment by preparing National Environmental Policy Act documentation. In 2005, Western completed or was working on 60 categorical exclusions, 18 environmental assessments and eight environmental impact statements, issued six Findings of No Significant Impact, and prepared four Mitigation Action Plans. Western held several public workshops/meetings and consulted with 70 American Indian Tribes for various projects. In 2005, Western was working on or had completed 11 Section 7 consultations under the Endangered Species Act. In 2005, Western recycled more than 3,600 metric tons of electrical equipment, mineral oil dielectric fluid, asphalt, fluorescent and metal halide light bulbs, wood poles and crossarms, and other items as well as office waste. Western made $437,816 worth of purchases containing recovered content materials. Western met the requirement of Executive Order 13148, Greening the Government through Leadership in Environmental Management to have its

  5. Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

    1996-11-01

    The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG&E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it`s new marketing plan.

  6. An Examination Regarding Educational Administration in the Context of Foucault’s Power Analysis

    OpenAIRE

    Şentürk, İlknur; Turan, Selahattin

    2012-01-01

    Background. Educational administration is a field that requires disciplinary collaboration and working in theory and practice. However, especially in Turkey, it can be said that theoretical and practical information produced in educational administration has reference retrieval from business administration, economy, management, organization and similar areas. In this context, it can be said that ontological, epistemological and methodological dilemmas and deadlocks are experienced due to not ...

  7. 5 CFR 2423.31 - Powers and duties of the Administrative Law Judge at the hearing.

    Science.gov (United States)

    2010-01-01

    ... decision and recommended order in the case. (d) Bench decisions. Upon joint motion of the parties, the Administrative Law Judge may issue an oral decision at the close of the hearing when, in the Judge's discretion... briefs with the Administrative Law Judge, pursuant to § 2423.33. If the decision is announced orally,...

  8. Fast-Track Design Efforts Using CFD: Bonneville Second Powerhouse

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Ebner, Laurie L.; Richmond, Marshall C.

    2007-10-10

    A set of three-dimensional, computational fluid dynamics (CFD) models were developed and used for the Bonneville Project tailrace to study the impact of a proposed outfall structure on the tailrace hydraulics; these structures were designed to improve the survival of downstream migrant (juvenile) salmon. Flows were simulated by solving the Reynolds-Averaged Navier-Stokes equations together with a two-equation k-epsilon turbulences model in a commercial CFD code. The numerical model was validated using field-measured velocity data. The model results identified undesirable combinations of outfall location and operational scenarios and helped to identify the location in which the outfall structure was built. The numerical model provided a relatively low-cost tool to rapidly simulate and visualize the flow field for multiple proposed outfall locations for a large number of operational scenarios. The visualizations of the results from the CFD model provided insights to hydraulic engineers and fisheries biologists working on the design and placement of the outfall structure.

  9. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  10. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  11. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    International Nuclear Information System (INIS)

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  12. Relative survival of juvenile chinook salmon (Oncorhynchus tshawyischa) through a Bonneville dam on the Columbia River

    International Nuclear Information System (INIS)

    The Bonneville Dam second powerhouse bypass system for juvenile salmon has one 6.1-m submersible travelling screen in each intake of all eight turbines, for a total of 24 screens. These screens set up a hydraulic cushion that deflects juvenile salmon away from the turbine intakes and into vertical bulkhead slots, from which they exit by their own volition into a collection gallery that travels the length of the powerhouse to a dewatering station and the outlet. A multiple-year evaluation was conducted on the comparative survival of subyearling chinook salmon through various passage modes at the dam. Using this information, operational scenarios could then be formulated to provide additional juvenile protection while meeting power system demands. In the summer, the juvenile salmon that passed through the bypass system had significantly lower survival rates than upper and lower turbine, spillway, and downstream control groups. Predation by northern squawfish (Ptychocheilus oregonensis) was suspected to have been the cause of high mortalities among bypassed fish. No significant differences existed between survival rates of upper and lower turbine groups. 7 refs., 2 figs., 1 tab

  13. A Scenario Generation Method for Wind Power Ramp Events Forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Ming-Jian; Ke, De-Ping; Sun, Yuan-Zhang; Gan, Di; Zhang, Jie; Hodge, Bri-Mathias

    2015-07-03

    Wind power ramp events (WPREs) have received increasing attention in recent years due to their significant impact on the reliability of power grid operations. In this paper, a novel WPRE forecasting method is proposed which is able to estimate the probability distributions of three important properties of the WPREs. To do so, a neural network (NN) is first proposed to model the wind power generation (WPG) as a stochastic process so that a number of scenarios of the future WPG can be generated (or predicted). Each possible scenario of the future WPG generated in this manner contains the ramping information, and the distributions of the designated WPRE properties can be stochastically derived based on the possible scenarios. Actual data from a wind power plant in the Bonneville Power Administration (BPA) was selected for testing the proposed ramp forecasting method. Results showed that the proposed method effectively forecasted the probability of ramp events.

  14. The operation of nuclear power plants in the conflict between administrative law and criminal law

    International Nuclear Information System (INIS)

    The conflicting interests of administrative law and criminal law give rise to a number of burdensome conditions to be met by the operators of nuclear plants. Of course, it is one of the peculiarities of criminal law that nobody can decide for himself whether he wants to become involved in it. There is probably no other choice than meeting, with a good blend of composure and cleverness, the criteria now surrounding the operation of a nuclear facility. (orig.)

  15. The psychological mechanism of making administrative decisions in the bodies of state power.

    OpenAIRE

    Aleksandr VORONOV

    2016-01-01

    The concept of psychological mechanism as the basic category of professional activity is articulated in the article. The specifics of making administrative and government decisions in government bodies of Ukraine are characterised. The concept of psychological mechanisms of making managerial decisions is presented. The model of psychological mechanisms of making managerial decisions in government bodies is formed and described. It is shown that the model involves psychological ...

  16. VMware vSphere PowerCLI Reference Automating vSphere Administration

    CERN Document Server

    Dekens, Luc; Sizemore, Glenn; van Lieshout, Arnim; Medd, Jonathan

    2011-01-01

    Your One-Stop Reference for VMware vSphere Automation If you manage vSphere in a Windows environment, automating routine tasks can save you time and increase efficiency. VMware vSphere PowerCLI is a set of pre-built commands based on Windows PowerShell that is designed to help you automate vSphere processes involving virtual machines, datacenters, storage, networks, and more. This detailed guide-using a practical, task-based approach and real-world examples-shows you how to get the most out of PowerCLI's handy cmdlets. Learn how to: Automate vCenter Server and ESX/ESX(i) Server deployment and

  17. Northwest power gamble: Washington utilities go for broke on nuclear; region's citizens make conservation bid

    International Nuclear Information System (INIS)

    The Washington Public Power Supply System (WPPSS) is asking for a reactor construction moratorium in an effort to get fast relief from the Bonneville Power Administration (BPA), which is authorized to guarantee power purchases from new power plants. Supporters of nuclear power plants as well as those of the soft energy path are watching to see how BPA will handle its mandate against acquiring new thermal plants until conservation and renewable energy potentials are exhausted. BPA can subvert the Pacific Northwest Power Act with 20-year contracts based on conventional forecasts despite evidence that new plants are unneeded. There is also evidence that the public rejects the idea of a moral obligation to bail out nuclear power cost overruns at taxpayer expense. The negotiations involve not only WPPSS and BPA, but Moody's Investor Service and environmental groups

  18. Alaska Power Administration Federal Power Program financial statements with supplementary information September 30, 1994 and September 30, 1993 with auditors` reports thereon

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-13

    The attached report presents the results of our audit of the Department of Energy`s Alaska Power Administration (APA) financial statements as of September 30, 1994. In our opinion, the APA statements are fairly presented in all material respects in accordance with generally accepted accounting principles. our reports on the APA internal control structure and on its compliance with laws and regulations are also provided. The US Government, through the Department of Energy, operates APA at two sites to provide hydroelectric power to Juneau and Anchorage, Alaska. Additional information about APA is provided in the notes to the financial statements. The 1994 financial statement audit was made under provisions of the Inspector General Act (5 USC. App.), as amended, the Chief Financial Officers (CFO) Act (31 USC 1500) and the Office of Management and Budget implementing guidance to the CFO Act. The auditors` work was conducted in accordance with generally accepted government auditing standards.

  19. Siting of nuclear power plants and administration in cities, towns and villages

    International Nuclear Information System (INIS)

    For the siting problems, there are many explanations and documents from the side to construct nuclear power plants, but few which makes assertion from the side of accepting the plants. However, present difficulties in the siting problems of nuclear power plants cannot be solved if the assertion of the accepting side is neglected. The details from the start of the siting to now in Tsuruga city are described. It is tried to explain the situation with the documents expressing opinions, demands and petitions, and replies exchanged between Tsuruga city and the government, Fukui Prefecture, and the related power companies, and the related laws. The details include the failures and accidents of nuclear plants reported to date. The reasons why the mayors or headmen of towns or villages want to invite the nuclear power plants are that the development of their region can be expected, and favorable influence results in to the regional economy, and further they can cooperate with the national policy. However, opposition movements are the most embarrassing affairs for them, and it is due to the condition that they cannot give the satisfactory answer to the opposing people so far. They cannot but depend solely on the responsibility of the government to safety. On the organizations of cities, towns and villages accepting nuclear power plants and the influence on local community, detailed reports are presented using various documents on preparation, antidisaster plan, radiation monitoring organization, movement of population, the effects regarding tax system and finance, influence on the life of inhabitants and others. (Wakatsuki, Y.)

  20. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence

  1. Outline of the Nuclear Power Training Center of Tomari Administration Office

    International Nuclear Information System (INIS)

    At the Nuclear Power Training Center of Hokkaido Electric Power Company, Inc. (NTC), maintenance technicians, plant operators and other technicians are educated and provided with practical training in order to cultivate the human resources necessary for the safe and stable operation of Tomari Nuclear Power Station. The NTC is at the site of the Tomari plant and the training at NTC began in October, 1993. A full scale model of plant simulator for education and training has been installed. Also a full size model of Mechanical, Instrument and Control system, and Electric training facilities have been completed. The operational training of normal start-up, shut-down, and abnormal condition of the Tomari plant, disassembly, inspection, rebuilding, adjustment of the equipment and malfunction training under simulated conditions can be conducted with near reality using these facilities. Not only has the education and training been carried out annually as scheduled, but also NTC has been used by the staff of our company and related industries as a place of independent education and training. This paper describes the special features of the training facilities, the training plans and the training results for the last fiscal year 1995. (author)

  2. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  3. Governmental control of public expenditure in the constitutional State: thoughts regarding General Comptroller sanctioning powers approval on functional administrative responsibility

    Directory of Open Access Journals (Sweden)

    Erika García Cobián Castro

    2013-12-01

    Full Text Available Constitutional doctrine has little addressed on the General Comptroller of the Republic and its controlling function of public resources execution and management. Efforts have been made to explain this situation in other realities, regarding high budgetary, accounting and auditing content needed to carry out auditing activities constitutionally assigned to this kind of entities. Nevertheless, identifying competences of the General Comptroller of the Republic and its nature of autonomous constitutional body shapes an important expression of Constitutional State and the principle of powers division. This entity controls State’s Public Budget execution contributing to constitutional property protection, legality of budget implementation and the appropriate management of public resources, also the «efficiency» of social needs, proper functioning of public administration and prevention of corruption, among others duties. This article analyzes the constitutional mission of the General Comptroller in a Constitutional State promoting the process of given a constitutional status to the legal system in its area of influence, also optimizing constitutional properties protected. For such purpose, the 29622 recent law («Law that modifies the 27785 Organic Law of National Control System and the General Comptroller of the Republic extending powers in order to sanction in accordance of functional administrative responsibility» shall be used as object of constitutional analysis.

  4. SAT administrator

    International Nuclear Information System (INIS)

    SAT Administrator is the Information System for Nuclear Power Plant Personnel Training Program Design. It supports the design of training programs in the following phases: job analysis; task analysis; competency analysis; task competency association; definition of learning objectives to competencies; training program design; definition of test items. The general structure of the database and management software supports application of the SAT Administrator in any nuclear power installation

  5. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  6. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-11-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

  7. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-05-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this booklet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  8. 行政权滥用的预测与防范%Prediction and Precaution for Abusing the Administrative Powers

    Institute of Scientific and Technical Information of China (English)

    崔卓兰; 杜一平

    2012-01-01

    行政主体面对在执法中潜在的隐患和未来的不利因素时,因缺乏较好的认知意识和防范机制,在面对权力欲、金钱欲和物质欲望的刺激时容易丧失免疫力,导致以权谋私、权钱交易等为求利益而滥用行政权的问题产生。行政权滥用严重干扰了经济与社会的健康发展,阻碍了国家法治目标的实现。行政权滥用具有事先预防的可能性,本文以政府自身建设为基点,通过对执法程序中可能存在行政权滥用的环节进行事前预测和分析,提出了科学有效的事前防范与控制机制,以此作为实现依法行政的制度保障。%When the administrative agencies face the latent dangers and coming disadvantageous factors with law enforcement, due to the worse cognition and prevention system, and the worship for power, money and material, tend to depart from principle, problems of abusing of authority for personal gains will easily occur, with the exchange of right and money, whereas, it has the possibilities for the administrative agencies to take precautions against the abuse of authority in advance. This paper bases on the government self - improvement, predicts and analyses problems of authority abuse during the enforcement, proposes a scientific and effective precaution and control mechanism, to achieve security supervision system of law - based administration.

  9. The Legislative Council of the Hong Kong Special AdministrativeRegion: a study of its role, powers andfunctions in Hong Kong's political system

    OpenAIRE

    Gu, Yu; 顾瑜

    2013-01-01

     The dissertation assesses the level of autonomy of the Legislative Council (Legco) of the Hong Kong Special Administrative Region (HKSAR) and examines how the Legco exercises its legislative power, scrutinizes public finance and checks the executive in Hong Kong’s changing political system. After the return of sovereignty over Hong Kong to China, the initiation power of the legislature of the HKSAR receives more extensive restrictions under the Basic Law than the colonial time. The idea...

  10. On the Use of Energy Storage Technologies for Regulation Services in Electric Power Systems with Significant Penetration of Wind Energy

    DEFF Research Database (Denmark)

    Yang, Bo; Makarov, Yuri; Desteese, John;

    2008-01-01

    and frequently changing regulation signal. Several energy storage options have been analyzed based on thirteen selection criteria. The evaluation process resulted in the selection of flywheels, pumped hydro electric power (or conventional hydro electric power) plant and sodium sulfur or nickel cadmium batteries......Energy produced by intermittent renewable resources is sharply increasing in the United States. At high penetration levels, volatility of wind power production could cause additional problems for the power system balancing functions such as regulation. This paper reports some partial results...... of a project work, recently conducted by the Pacific Northwest National Laboratory (PNNL) for Bonneville Power Administration (BPA). The project proposes to mitigate additional intermittency with the help of Wide Area Energy Management System (WAEMS) that would provide a two-way simultaneous regulation service...

  11. A Study of the Spawning Ecology and Early Life History Survival of Bonneville Cutthroat Trout

    OpenAIRE

    Budy, Phaedra; Wood, Sarah; Roper, Brett

    2012-01-01

    We completed a large-scale field experiment in four tributaries of the Logan River, Utah, where the largest metapopulation of imperiled Bonneville cutthroat trout Oncorhynchus clarkii utah persists. We documented the spatial and temporal distributions of spawners, quantified substrate use versus substrate availability, and evaluated differences in hatch and emergence fry success between and among sites in relation to habitat characteristics. We observed considerable variability in the timing,...

  12. Improved Stratigraphic Interpretation of Dense Lacustrine Carbonates from Lake Bonneville, UT

    Science.gov (United States)

    Steponaitis, E.; McGee, D.; Quade, J.

    2014-12-01

    Recent work on the past hydroclimate of the Bonneville Basin has utilized dense, laminated carbonate deposits that formed beneath the surface of Lake Bonneville starting around 26 ka (McGee et al. 2012). These calcite and aragonite deposits form in calm, protected spaces that have been submerged by the lake, including hillside caves, cracks in bedrock, and interstitial spaces in tufa and abandoned beach gravel deposits. Dense lacustrine carbonates are very useful for paleoclimate studies because they can be used to develop continuous records of lake chemistry anchored by precise U-Th dates. However, many questions remain about the conditions in which these dense carbonates form: at what depth range do these carbonates form, and can basal and top ages help constrain the lake level curve? Do coeval carbonates formed at different depths in the lake preserve information about vertical gradients in lake water properties like δ18O and 87Sr/86Sr? To address these questions and others, this study examines a sequence of dense lacustrine carbonates deposited within bedrock, tufa, and abandoned shoreline gravels from Stansbury Island, UT. We use U-Th dating, local stratigraphic interpretations, and previously established lake level constraints to draw insights into the formation and context of these deposits. Improved understanding of dense lacustrine carbonates will facilitate more detailed and accurate interpretations of their stratigraphic significance, and ultimately, aid the development of improved paleoclimate records from Lake Bonneville and beyond. McGee, D., et al. 2012. Lacustrine Cave Carbonates : Novel Archives of Paleohydrologic Change in the Bonneville Basin (Utah , USA). Earth and Planetary Science Letters (351-352): 182-194.

  13. Genetic diversity and divergence among freshwater mussel (Anodonta) populations in the Bonneville Basin of Utah.

    Science.gov (United States)

    Mock, K E; Brim-Box, J C; Miller, M P; Downing, M E; Hoeh, W R

    2004-05-01

    Populations of the freshwater mussel genus Anodonta appear to be in a state of rapid decline in western North America, following a trend that unfortunately seems to be prevalent among these animals (Mollusca: Unionoida). Here we describe the patterns of molecular divergence and diversity among Anodonta populations in the Bonneville Basin, a large sub-basin of the Great Basin in western North America. Using amplified fragment length polymorphism (AFLP) analysis, we found a striking lack of nuclear diversity within some of these populations, along with a high degree of structuring among populations (FST = 0.61), suggesting post-Pleistocene isolation, due either to a long-term loss of hydrologic connectivity among populations or to more recent fish introductions. We also found evidence of recent hybridization in one of these populations, possibly mediated by fish-stocking practices. Using mitochondrial sequence data, we compared the Bonneville Basin populations to Anodonta in several other drainages in western North America. We found a general lack of resolution in these phylogenetic reconstructions, although there was a tendency for the Bonneville Basin Anodonta (tentatively A. californiensis) to cluster with A. oregonensis from the adjacent Lahontan Basin in Nevada. We recommend further investigation of anthropogenic factors that may be contributing to the decline of western Anodonta and a broad-scale analysis and synthesis of genetic and morphological variation among Anodonta in western North America. PMID:15078447

  14. Pleistocene Lake Bonneville as an analog for extraterrestrial lakes and oceans: Chapter 21

    Science.gov (United States)

    Chan, M.A.; Jewell, P.; Parker, T.J.; Ormo, J.; Okubo, Chris; Komatsu, G.

    2016-01-01

    Geomorphic confirmation for a putative ancient Mars ocean relies on analog comparisons of coastal-like features such as shoreline feature attributes and temporal scales of process formation. Pleistocene Lake Bonneville is one of the few large, geologically young, terrestrial lake systems that exemplify well-preserved shoreline characteristics that formed quickly, on the order of a thousand years or less. Studies of Lake Bonneville provide two essential analog considerations for interpreting shorelines on Mars: (1) morphological variations in expression depend on constructional vs erosional processes, and (2) shorelines are not always correlative at an equipotential elevation across a basin due to isostasy, heat flow, wave setup, fetch, and other factors. Although other large terrestrial lake systems display supporting evidence for geomorphic comparisons, Lake Bonneville encompasses the most integrated examples of preserved coastal features related to basin history, sediment supply, climate, and fetch, all within the context of a detailed hydrograph. These collective terrestrial lessons provide a framework to evaluate possible boundary conditions for ancient Mars hydrology and large water body environmental feedbacks. This knowledge of shoreline characteristics, processes, and environments can support explorations of habitable environments and guide future mission explorations.

  15. Coordination of Environmental Administrative Power and Citizen's Environmental%论环境行政权与公民环境权的协调

    Institute of Scientific and Technical Information of China (English)

    俞泉峰

    2013-01-01

    An economic freedom thoughts inspire people greedy, People act recklessly, care for nobody and explore natural resources, destroy the ecological balance which cause serious ecological crisis. In order to safeguard the public interest, environmental administrative power extends out from the traditional administrative power, and also give to the citizens environmental right to achieve the "source control". But the defects are subject to the complexity of environmental issues and environmental administrative power itself, ]The two appear dislocation.This paper extended the ideas and discussed the coordination of environment administrative power and citizen's environmental right.%  自由经济思潮激发人们贪婪的逐利欲,肆无忌惮地掠夺自然资源,破坏生态平衡,引发严重的生态危机。为维护公共利益,环境行政权从传统的行政权中延伸出来,亦赋予公民以环境权,以期达到“源头控制”,但受制于环境问题的复杂性及环境行政权本身的缺陷,二者出现错位。该文顺延上述思路,讨论环境行政权与公民环境权的协调。

  16. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1985-08-01

    The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The Guidelines allow for individual approaches to organizational structures to account for differences in plant size, number of operating units, number of plant sites, and the individual utility approach to providing technical support. These unique approaches, however, should meet the criteria of a reasoned, fully developed, and logically consistent focus on the user's organization in terms of organization of work, policies and procedures, staffing, and external relationships.

  17. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Science.gov (United States)

    2010-05-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of...

  18. The reform of the Indian power sector: administrations for sale. Transforming the state electricity boards into enterprises

    International Nuclear Information System (INIS)

    The present thesis is about the reforms in the electricity sector in India, and more specifically about those in the State Electricity Boards (SEBs), organisations responsible for generation, transmission and distribution of electricity at the level of each of the States of India. The thesis is interested in practical questions of industrial economy such as: what is the impact of de-integration on the functioning of the SEBs?, impact of the creation of regulatory committees?, of privatisation?. Going beyond the critical analysis of the proposed reforms, the thesis also puts forward certain practical propositions as regards the way of reforming the SEBs. The thesis is divided in two parts (of four chapters each). The first part analyses and characterizes the functioning of a SEB. It presents practical description of the organisational characteristics, but also of their linking to the decision making mechanisms at work. On the theoretical plane, it settles the debate on the validity of the analytical concept of soft budget constraint for a SEB, and specifies the modalities of an analysis in terms of property rights, as well as the pertinence of several concepts derived from that of cost. The second part deals with the ongoing reforms and those to be implemented. It defines the concept of enterprising and proposes a critical discussion of the ongoing reforms, in the light of the normative criterion of enterprisation. It distinguishes conceptually and in the practical analysis, the 'structural' reforms (corporatisation, de-integration, and setting up of regulatory commissions) on the one hand and the questions of privatisation on the other. It proposes a model explaining the 'trade off' between public enterprisation and rapid privatisation. The first chapter situates the SEBs in the Indian power sector, shows the limit of the analyses in terms of lack of funds or political interference. Chapter 2 makes a critical presentation of the various tools offered to the

  19. The future of GPS-based electric power system measurements, operation and control

    Energy Technology Data Exchange (ETDEWEB)

    Rizy, D.T. [Oak Ridge National Lab., TN (United States); Wilson, R.E. [Western Area Power Administration, Golden, CO (United States); Martin, K.E.; Litzenberger, W.H. [Bonneville Power Administration, Portland, OR (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Overholt, P.N. [Dept. of Energy, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States)

    1998-11-01

    Much of modern society is powered by inexpensive and reliable electricity delivered by a complex and elaborate electric power network. Electrical utilities are currently using the Global Positioning System-NAVSTAR (GPS) timekeeping to improve the network`s reliability. Currently, GPS synchronizes the clocks on dynamic recorders and aids in post-mortem analysis of network disturbances. Two major projects have demonstrated the use of GPS-synchronized power system measurements. In 1992, the Electric Power Research Institute`s (EPRI) sponsored Phase Measurements Project used a commercially available Phasor Measurements Unit (PMU) to collect GPS-synchronized measurements for analyzing power system problems. In 1995, Bonneville Power Administration (BPA) and Western Area Power Administration (WAPA) under DOE`s and EPRI`s sponsorship launched the Wide Area Measurements (WAMS) project. WAMS demonstrated GPS-synchronized measurements over a large area of their power networks and demonstrated the networking of GPS-based measurement systems in BPA and WAPA. The phasor measurement technology has also been used to conduct dynamic power system tests. During these tests, a large dynamic resistor was inserted to simulate a small power system disturbance.

  20. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  1. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  2. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  3. Variability in Large-Scale Wind Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Kiviluoma, Juha; Holttinen, Hannele; Weir, David; Scharff, Richard; Soder, Lennart; Menemenlis, Nickie; Cutululis, Nicolaos A.; Lopez, Irene Danti; Lannoye, Eamonn; Estanqueiro, Ana; Gomez-Lazaro, Emilio; Zhang, Qin; Bai, Jianhua; Wan, Yih-Huei; Milligan, Michael

    2016-09-01

    The paper demonstrates the characteristics of wind power variability and net load variability in multiple power systems based on real data from multiple years. Demonstrated characteristics include probability distribution for different ramp durations, seasonal and diurnal variability and low net load events. The comparison shows regions with low variability (Sweden, Spain and Germany), medium variability (Portugal, Ireland, Finland and Denmark) and regions with higher variability (Quebec, Bonneville Power Administration and Electric Reliability Council of Texas in North America; Gansu, Jilin and Liaoning in China; and Norway and offshore wind power in Denmark). For regions with low variability, the maximum 1 h wind ramps are below 10% of nominal capacity, and for regions with high variability, they may be close to 30%. Wind power variability is mainly explained by the extent of geographical spread, but also higher capacity factor causes higher variability. It was also shown how wind power ramps are autocorrelated and dependent on the operating output level. When wind power was concentrated in smaller area, there were outliers with high changes in wind output, which were not present in large areas with well-dispersed wind power.

  4. Principles on administrative implementation of nuclear safety regulations. Case study of the investigation framework by nuclear regulation authority on the shatter zones at the Tsuruga Power Station

    International Nuclear Information System (INIS)

    The investigation by experts commissioned by the Nuclear Regulations Authority (NRA) concluded that 'the D-1' shatter zone directly beneath the base mat of the Tsuruga Power Station Unit 2 might be an active fault. According to NRA's interpretation of regulations, an active fault beneath critical facilities alone disables their operations. The administrative procedure of this investigation and conclusion, however, raised three regulatory problems as follows; the deficiency to effectively reflect associated scientific knowledge to evolve, insufficient institutional independence of risk assessment from risk management, and legal difficulty in conducting administrative dispute to enforce administrative remedies. This report, through analyzing these regulatory problems, proposes the following three regulatory reforms in order to alleviate them. (1) Reform internal consultative experts committees appointed by the NRA, which are excercizing decisive influences on administrative disposition while without any statutory basis, into a statutory council or a special purpose committee under the Act for Establishement of Nuclear Regulation Authority. (2) Substantialize institutional separation of risk assessment from risk management in NRA by statutory measures. (3) Make procedures and rules concerning experts' deliberative judgements into administrative bylaws to the extent necessary to secure accountability and self-regulation in the NRA. (author)

  5. Power

    OpenAIRE

    Samuel Bowles; Herbert Gintis

    2007-01-01

    We consider the exercise of power in competitive markets for goods, labour and credit. We offer a definition of power and show that if contracts are incomplete it may be exercised either in Pareto-improving ways or to the disadvantage of those without power. Contrasting conceptions of power including bargaining power, market power, and consumer sovereignty are considered. Because the exercise of power may alter prices and other aspects of exchanges, abstracting from power may miss essential a...

  6. Power and status. Administration, appointment policies, and social hierarchies in the Roman Empire (193-284 AD)

    NARCIS (Netherlands)

    Mennen, I.A.M.

    2010-01-01

    This study defines changing power and status relations between the highest ranking representatives of Roman imperial power at the central level, particularly in a period when the central level came under tremendous pressure, AD 193-284. Prosopography has been used as the principal method for analyzi

  7. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  8. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rakowski, Cynthia L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Perkins, William A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Richmond, Marshall C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  9. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

    2001-05-01

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  10. Strengthening the soft power of army's administration in the field drill%强化驻训部队管理的“软实力”

    Institute of Scientific and Technical Information of China (English)

    张波

    2012-01-01

    Based on the reality of the armyrs administration in the field drill, the thesis aims at meeting the requirements of the new times and military revolution for the army's administration. It mainly analyzes the specific methods of strengthening the soft power of the armyrs administration in the field drill, and probes into the effective ways of putting ideological education in the first place, securing the mechanism and regulations and logistical supplies, which provides a new thought for the armyts administration .%肾贴驻训部队管理实际,着眼时代发展和军事变革对部队管理教育的新要求,着力阐释了强化驻训部队管理“软实力”的具体手段,探讨了思想教育为先、组织制度保证、跟进保障到位等有效途径,为驻训部队搞好管理工作开辟了新思路。

  11. THE NEED OF RETHINKING THE PUBLIC ADMINISTRATION SYSTEM IN THE CONTEXT OF THE GROWING POWER OF THE CIVIL SOCIETY

    OpenAIRE

    NEAMTU FLORENTINA

    2013-01-01

    Worldwide, the trend of the last twenty years has been that of globalization and the intense development of the social systems. In this context, nation states are put in a completely new position in which institutions and administrative systems should be flexible to accommodate these changes. In the new coordinates of established geopolitical framework, central and local government is the defining factors in economic competitiveness of a country or economic region. A very important aspect of ...

  12. The DOE Wide Area Measurement System (WAMS) Project -- Demonstration of dynamic information technology for the future power system

    Energy Technology Data Exchange (ETDEWEB)

    Mittelstadt, W.A. [Bonneville Power Administration (United States); Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States); Krause, P.E.; Wilson, R.E. [Western Power Administration (United States); Overholt, P.N. [USDOE (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

    1995-12-31

    In 1989 the Bonneville Power Administration (BPA) and the Western Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands in an environment characterized by increased competition, a wider range of services and vendors, and much narrower operating margins. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI).

  13. Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

    2005-06-01

    This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

  14. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batten, G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  15. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  16. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  17. Relative survival of juvenile chinook salmon through Bonneville Dam on the Columbia River

    International Nuclear Information System (INIS)

    This paper reports on preliminary results of a multiple year study which indicate that juvenile chinook salmon passing through the juvenile bypass system at Bonneville Dam second powerhouse during the summer have significantly lower survival rates compared to other treatment groups (upper and lower turbine, spillway, and downstream control). The spillway groups had the highest survival rate, followed by the downstream, frontroll, turbines, and finally, the bypass groups. There was no significant difference between the survival rates of the upper and lower turbine groups. Estimates of long term survival using adult returns are incomplete at this time. However, both the juvenile and adult data indicate the passage through the juvenile bypass system versus the turbines does not improve the survival of subyearling juvenile chinook salmon

  18. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  19. Optimum testing intervals of building emergency power supply systems in tall buildings in the Hong Kong Special Administrative Region

    Science.gov (United States)

    Kwok, Yu Fat

    The main objective of this study is to develop a model for the determination of optimum testing interval (OTI) of non-redundant standby plants. This study focuses on the emergency power generators in tall buildings in Hong Kong. The model for the reliability, which is developed, is applicable to any non-duplicated standby plant. In a tall building, the mobilisation of occupants is constrained by its height and the building internal layout. Occupant's safety, amongst other safety considerations, highly depends on the reliability of the fire detection and protection system, which in turn is dependent on the reliability of the emergency power generation plants. A thorough literature survey shows that the practice used in determining OTI in nuclear plants is generally applicable. Historically, the OTI in these plants is determined by balancing the testing downtime and reliability gained from frequent testing. However, testing downtime does not exist in plants like emergency power generator. Subsequently, sophisticated models have taken repairing downtime into consideration. In this study, the algorithms for the determination of OTI, and hence reliability of standby plants, are reconsidered. A new concept is introduced into the subject. A new model is developed for such purposes which embraces more realistic factors found in practice. System aging and the finite life cycle of the standby plant are considered. Somewhat more pragmatic is that the Optimum Overhauling Interval can also be determined from this new model. System unavailability grow with time, but can be reset by test or overhaul. Contrary to fixed testing intervals, OTI is determined whenever system point unavailability exceeds certain level, which depends on the reliability requirement of the standby system. An optimum testing plan for lowering this level to the 'minimum useful unavailability' level (see section 9.1 for more elaboration) can be determined by the new model presented. Cost effectiveness is

  20. Administrative decisions

    International Nuclear Information System (INIS)

    This article reviews relevant administrative decisions that have been taken in various countries during the last semester of 1999 and the first one of 2000. In Argentina, an inter-ministerial commission has been settled to examine the prospects of completing the construction of the Atucha-2 unit. In Sweden, an agreement has been signed between Sydkraft, Vattenfall and the Swedish government on a compensation plan for the early shutdown of the Barsebaeck unit 1. In Switzerland, the government of the canton of Bern has rejected a constitutional initiative requesting the shutdown of the Muehleberg nuclear power plant. (A.C.)

  1. Power

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård; Fogsgaard, Morten

    2016-01-01

    In this chapter, we will explore the dynamics of power in processes of creativity, and show its paradoxical nature as both a bridge and a barrier to creativity in organisations. Recent social psychological experimental research (Slighte, de Dreu & Nijstad, 2011) on the relation between power...... and creativity suggests that when managers give people the opportunity to gain power and explicate that there is reason to be more creative, people will show a boost in creative behaviour. Moreover, this process works best in unstable power hierarchies, which implies that power is treated as a negotiable...... and floating source for empowering people in the organisation. We will explore and discuss here the potentials, challenges and pitfalls of power in relation to creativity in the life of organisations today. The aim is to demonstrate that power struggles may be utilised as constructive sources of creativity...

  2. 行政权力网上公开透明运行系统分析%Internet Open and Transparent Operation of Administrative Power System Analysis

    Institute of Scientific and Technical Information of China (English)

    张同武

    2011-01-01

    行政权力网上公开透明运行,是在推进服务型政府、廉洁政府和法治政府建设进程中提出的政务创新理念,实质是以规范行政权力运行为目的,以电子政务网络为载体,以现代信息技术为支撑,实现权力法定、程序固化、裁量限定,行政权力事项全程网上公开透明运行,并对权力运行全过程进行实时动态监察监控。通过推进行政权力网上公开透明运行,能够逐步提高部门的行政效率;促进政府管理方式的创新;能够不断的在运行过程中创新监察手段,从源头深化防治腐败的工作;搭建互动平台,推动政府决策的科学化、民主化;规范了各部门运行机制,提升了电子政务的水平。通过不断的落实这一理念就能够确保权力真正在阳光下运行。%Internet open and transparent operation of administrative power,is to promote the service-oriented government,clean government and rule of law,the government made the process of building the concept of government innovation,the real executive power is a standard operation for the purpose of e-government network as the carrier,to modern information technology support,to achieve the statutory powers,curing process,limited discretion,the executive power issues throughout the Internet open and transparent operation,and the power to run the whole process of real-time dynamic monitoring of monitoring.The Internet by promoting open and transparent operation of administrative power,to gradually increase the department's administrative efficiency;promote government management of innovation;can continue the process of innovation in the operation monitoring means,from the source to deepen corruption prevention work;build an interactive platform to promote government decision-making scientific and democratic;regulate the various departments operating mechanism,enhance the level of e-government.Through continuous implementation of this

  3. Power

    OpenAIRE

    Hafford-Letchfield, Trish

    2015-01-01

    This chapter looks at the concept of power in social work by focusing on what this means as a ‘professional’ and theorizes competing discourses of empowerment in social work and its key concepts, drawing in particular on the explanatory powers of critical theorist Michel Foucault (1991). The chapter problematizes the concept of power by explicitly drawing on both users’ and carers’ accounts from the literature to demonstrate different external and internal influences on the root causes of dis...

  4. Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Larry; Wright, Patrick

    1990-10-01

    The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat, 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs.

  5. Movement and Habitat Use of Bonneville Cutthroat Trout (Oncorhynchus Clarki Utah): A Case Study In the Temple Fork Watershed

    OpenAIRE

    Lokteff, Ryan L.

    2014-01-01

    Movement patterns and habitat use of Bonneville cutthroat trout (Oncorhynchus clarki utah) in tributaries of the Logan River watershed are greatly aected by habitat alterations created by North American Beaver (Castor canadensis). Evaluation of cutthroat trout habitat use in these watersheds is also complicated by biotic interactions with invasive brown trout (Salmo trutta) and brook trout (Salvelinus fontinalis). My objectives in this thesis were to 1.) Evaluate the passage of beaver dams by...

  6. Stratigraphy and chronology of offshore to nearshore deposits associated with the Provo shoreline, Pleistocene Lake Bonneville, Utah

    Science.gov (United States)

    Godsey, H.S.; Oviatt, Charles G.; Miller, D.M.; Chan, M.A.

    2011-01-01

    Stratigraphic descriptions and radiocarbon data from eleven field locations are presented in this paper to establish a chronostratigraphic framework for offshore to nearshore deposits of Lake Bonneville. Based on key marker beds and geomorphic position, the deposits are interpreted to have accumulated during the period from the late transgressive phase, through the overflowing phase, into the regressive phase of the lake. Radiocarbon ages of sediments associated with the Provo shoreline indicate that Lake Bonneville dropped rapidly from the Provo shoreline at about 12,600 14C yr BP (15,000 cal yr B.P.). The presence of one or more sand beds in the upper part of the Provo-aged marl indicates rapid lowering of lake level or storm events at the end of the Provo episode. An accurate understanding of the timing and nature of Lake Bonneville's climate-driven regression from the Provo shoreline is critical to correlations with records of regional and hemispheric climate change. The rapid descent of the lake from the Provo shoreline correlates with the decline of Lakes Lahontan and Estancia, and with the onset of the B??lling-Aller??d warming event. ?? 2011 Elsevier B.V.

  7. Research for the Boundary of Government Power---In the Perspective of Administrative Law%论政府权力界限--以行政法治为视角

    Institute of Scientific and Technical Information of China (English)

    陈向芳; 邓薇

    2014-01-01

    Putting the power into system cage and letting it run in the sun , which is one of the main demands of Chinese society after the Third Plenary Session of the Eighteenth Central Committee of the Communist Party of China .Government power is authorized by the Constitution and laws , and the best “system cage” for it is setting le-gal boundaries .Administrative law is the important mechanism to control and standardize administrative power , which defines the boundaries and constraints for government power , sets the legal boundaries for the operation of government power .The boundaries of government power are power authorization , power guarantee and administra-tive responsibility .The constraints of government power are due process , rational administration and standardized administrative discretion .%把权力关进制度笼子,让权力在阳光下运行,是党的十八届三中全会之后中国社会的主要诉求之一。政府权力来源于宪法和法律的授权,为政府权力设定法律界限就是最好的“制度笼子”。行政法是控制和规范行政权力的重要机制,为政府权力的运行设定法律界限,规定了政府权力的边界范围和条件限制。政府权力的边界在于:职权法定、权利保障、行政责任;政府权力的限制在于:程序正当、合理行政、规范行政自由裁量权。

  8. Evaluation of Carrying Capacity : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 1 of 4, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Johnson, Gary E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity.

  9. Evaluation of carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 1 of 4, Final report

    International Nuclear Information System (INIS)

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity

  10. BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

  11. Draft Environmental Impact Statement: BPA/Puget Power Northwest Washington Transmission Project

    International Nuclear Information System (INIS)

    Bonneville Power Administration (BPS) and Puget Sound Power ampersand Light (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the city of Bellingham starting in 1995. The upgrades of the interconnected 230,000 volt (230-kV) and 115-kV systems are needed to increase the reliability of the local transmission system and to increase the import capacity on a nearby US-Canada 500-kV intertie by about 850 megawatts (MW). The increase in north-south transfer capability would be shared by BPA and Puget Power (about 425 MW each). Other actions would include replacement of an existing BPA 230-kV single-circuit, wood-pole H-frame transmission line with a lattice-steel double-circuit line; an existing Puget Power 115-kV single wood-pole transmission line rebuild, two short 115-kV Puget Power lines added at BPA's Bellingham Substation; and improvements made at existing BPA and Puget Power substations

  12. Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-06-04

    This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

  13. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Friesen, Thomas A. (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-02-01

    Pacific salmon Oncorhynchus spp. populations have declined over the last century due to a variety of human impacts. Chum salmon O. keta populations in the Columbia River have remained severely depressed for the past several decades, while upriver bright (URB) fall Chinook salmon O. tschawytscha populations have maintained relatively healthy levels. For the past seven years we have collected data on adult spawning and juvenile emergence and outmigration of URB fall Chinook and chum salmon populations in the Ives and Pierce islands complex below Bonneville Dam. In 2004, we estimated 1,733 fall Chinook salmon and 336 chum salmon spawned in our study area. Fall Chinook salmon spawning peaked 19 November with 337 redds and chum salmon spawning peaked 3 December with 148 redds. Biological characteristics continue to suggest chum salmon in our study area are similar to nearby stocks in Hardy and Hamilton creeks, and Chinook salmon we observe are similar to upriver bright stocks. Temperature data indicated that 2004 brood URB fall Chinook salmon emergence began on 6 January and ended 27 May 2005, with peak emergence occurring 12 March. Chum salmon emergence began 4 February and continued through 2 May 2005, with peak emergence occurring on 21 March. Between 13 January and 28 June, we sampled 28,984 juvenile Chinook salmon and 1,909 juvenile chum salmon. We also released 32,642 fin-marked and coded-wire tagged juvenile fall Chinook salmon to assess survival. The peak catch of juvenile fall Chinook salmon occurred on 18 April. Our results suggested that the majority of fall Chinook salmon outmigrate during late May and early June, at 70-80 mm fork length (FL). The peak catch of juvenile chum salmon occurred 25 March. Juvenile chum salmon appeared to outmigrate at 40-55 mm FL. Outmigration of chum salmon peaked in March but extended into April and May.

  14. Bypass system modification at Bonneville Dam on the Columbia River improved the survival of juvenile salmon

    Science.gov (United States)

    Ferguson, J.W.; Sandford, B.P.; Reagan, R.E.; Gilbreath, L.G.; Meyer, E.B.; Ledgerwood, R.D.; Adams, N.S.

    2007-01-01

    From 1987 to 1992, we evaluated a fish bypass system at Bonneville Dam Powerhouse 2 on the Columbia River. The survival of subyearling Chinook salmon Oncorhynchus tshawytscha released into the system ranged from 0.774 to 0.911 and was significantly lower than the survival of test fish released into turbines and the area immediately below the powerhouse where bypass system flow reentered the river. Yearling and subyearling Chinook salmon and yearling coho salmon O. kisutch released into the bypass system were injured or descaled. Also, levels of blood plasma cortisol and lactate were significantly higher in yearling and subyearling Chinook salmon that passed through the bypass system than in fish released directly into a net located over the bypass exit. This original system was then extensively modified using updated design criteria, and the site where juvenile fish reentered the river was relocated 2.8 km further downstream to reduce predation on bypassed fish by northern pikeminnow Ptychocheilus oregonensis. Based on studies conducted from 1999 to 2001, the new bypass system resulted in high fish survival, virtually no injuries to fish, fish passage times that were generally similar to water travel times, and mild stress responses from which fish recovered quickly. The mean estimated survival of subyearling Chinook salmon passing through the new bypass system was 0.946 in 2001, which was an usually low-flow year. Survival, physical condition, passage timing, and blood physiological indicators of stress were all useful metrics for assessing the performance of both bypass systems and are discussed. The engineering and hydraulic criteria used to design the new bypass system that resulted in improved fish passage conditions are described.

  15. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  16. 学术权力与行政权力包容的理论分析与制度安排%Theoretical Analysis and Institutional Arrangements of Inclusion between Academic Power and Administrative Power

    Institute of Scientific and Technical Information of China (English)

    王务均; 戴玉纯

    2014-01-01

    Inclusion idea,deriving from the theory of social solidarity,is the guiding ideology and effective way to solve the social problems of conflict and multiple interests strife ,and it is increasingly becoming a concept which can promote harmonious development of organizations and multiple subjects in recent years . The relationship between academic power and administrative power in the university is a classic case in the field of contemporary social conflict,contradictive but inseparable. Due to their commonly fundamental interest and goal, there are theoretical basis and can also build institutional arrangements of inclusion between them.%包容思想源自社会团结理论,是解决社会冲突问题和多元利益纷争的指导思想和有效方法,近年来越来越成为促进各类组织和多元主体和谐发展的观念。大学学术权力与行政权力的关系是当今社会冲突领域中的经典案例,两者既有区别又不能分离,由于根本利益和目标一致,它们之间存在包容的理论依据,能够建立包容的制度安排。

  17. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  18. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-06-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the EMF (electric and magnetic fields) produced by power lines and other electrical devices affect our health. Although no adverse health effects of electric power EMF have been confirmed, there is continued scientific uncertainty about this issue. Research on EMF is ongoing throughout the world. The purpose of this booklet is to answer some common questions that the BPA (Bonneville Power Administration) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  19. The reform of the Indian power sector: administrations for sale. Transforming the state electricity boards into enterprises; La reforme du secteur electrique de l'Inde: administrations a vendre. Transformer les state electricity boards en entreprises

    Energy Technology Data Exchange (ETDEWEB)

    Ruet, J

    2001-10-01

    The present thesis is about the reforms in the electricity sector in India, and more specifically about those in the State Electricity Boards (SEBs), organisations responsible for generation, transmission and distribution of electricity at the level of each of the States of India. The thesis is interested in practical questions of industrial economy such as: what is the impact of de-integration on the functioning of the SEBs?, impact of the creation of regulatory committees?, of privatisation?. Going beyond the critical analysis of the proposed reforms, the thesis also puts forward certain practical propositions as regards the way of reforming the SEBs. The thesis is divided in two parts (of four chapters each). The first part analyses and characterizes the functioning of a SEB. It presents practical description of the organisational characteristics, but also of their linking to the decision making mechanisms at work. On the theoretical plane, it settles the debate on the validity of the analytical concept of soft budget constraint for a SEB, and specifies the modalities of an analysis in terms of property rights, as well as the pertinence of several concepts derived from that of cost. The second part deals with the ongoing reforms and those to be implemented. It defines the concept of enterprising and proposes a critical discussion of the ongoing reforms, in the light of the normative criterion of enterprisation. It distinguishes conceptually and in the practical analysis, the 'structural' reforms (corporatisation, de-integration, and setting up of regulatory commissions) on the one hand and the questions of privatisation on the other. It proposes a model explaining the 'trade off' between public enterprisation and rapid privatisation. The first chapter situates the SEBs in the Indian power sector, shows the limit of the analyses in terms of lack of funds or political interference. Chapter 2 makes a critical presentation of the various tools

  20. Reliability centered maintenance of power transformers and circuit breakers

    Energy Technology Data Exchange (ETDEWEB)

    Purucker, S.L.; Goeltz, R.T. [Oak Ridge National Lab., TN (United States); Hemmelman, K.; Price, R. [Bonneville Power Administration, Van Couver, WA (United States)

    1992-08-01

    At the Bonneville Power Administration (BPA), we have historically maintained high voltage equipment. Including transformers and power circuit breakers, on a time driven basis. While this has served our needs in the past, newer methods are needed to effectively maintain the power system in future years. Today aging equipment, maintenance backlogs, and budget constraints are a reality. BPA has initiated a research and development project to examine reliability centered maintenance (RCM) as an alternative to time based maintenance on high voltage equipment. Under RCM, the performance of each place of equipment is to be monitored by observing many operating parameters. For example, with circuit breakers we will observe (measure) the trip time, accumulated contact wear using I{sup 2}T, timing of the mechanism, plus several other parameters. Equipment performing below a predetermined level, or equipment having accumulated a large amount of ``usage`` will receive maintenance. The maintenance will restore full performance and preserve an acceptable service life for that piece of equipment. To develop and evaluate RCM concepts, BPA is installing a prototype system at our Alvey Substation on 4 transformers and 25 breakers.

  1. 高校腐败遏制——强化行政权力的制衡与监督%Containment of Corruption in Colleges and Universities——Strengthening Restriction and Supervision on Administrative Power

    Institute of Scientific and Technical Information of China (English)

    樊晓云

    2012-01-01

    高校行政权力的失控和监督缺位,是导致高校腐败频发的主要原因,高校内部只有形成行政权力、学术权力和监督权力的"三权分立",并保持权力结构的良好平衡,才能够有效防范权力失控问题;通过强化网络监督,引入预防腐败网络监管平台,构建高校信息公开制度,形成高校有效的行政权力监督机制。%The out-of-control administrative power and vacancy of supervision cause the frequent occurrence of corruption in colleges and Universities.Only are the administrative power,academic power and supervisory authority independent separately,and a good balance of power structure should be kept,which can guard against the out-of-control power problem.By strengthening the network supervision,introducing the network supervision platform of corruption prevention,constructing the information openness system,and then the effective supervision mechanism on administrative power will be formed.

  2. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  3. Administrative Culture Vision is Our Government Executive Power Weakening and Countermeasures to Explore%行政文化视域下我国政府执行力弱化及对策探究

    Institute of Scientific and Technical Information of China (English)

    付耀华

    2011-01-01

    The government's executive power is the key to improve the management ability,is the comprehensive implementation of the scientific outlook on development,and promote the construction of harmonious society needs.Administrative culture is the soul of the administrative management,to the executive power of the government plays the role of play subtle influence.From the Angle of administrative culture discussed the cause of the weakening of the government's executive power and to find the relevant countermeasures,construction and that adapt to the execution culture,in our country the innovation of administrative culture,promote the development of the executive power of the effective way.%政府执行力是提高政府管理能力的关键,是全面贯彻落实科学发展观,推进和谐社会建设的需要。行政文化是行政管理之魂,其对政府执行力的发挥起到潜移默化的作用。从行政文化视角探讨政府执行力弱化的原因并找出相关对策,建构与之相适应的执行力文化,是促进我国行政文化的创新发展,提升政府执行力的有效途径。

  4. Power system identification toolbox: Phase two progress

    Energy Technology Data Exchange (ETDEWEB)

    Trudnowski, D.J.

    1994-08-01

    This report describes current progress on a project funded by the Bonneville Power Administration (BPA) to develop a set of state-of-the-art analysis software (termed the Power System Identification [PSI] Toolbox) for fitting dynamic models to measured data. The project is being conducted as a three-phase effort. The first phase, completed in late 1992, involved investigating the characteristics of the analysis techniques by evaluating existing software and developing guidelines for best use. Phase Two includes extending current software, developing new analysis algorithms and software, and demonstrating and developing applications. The final phase will focus on reorganizing the software into a modular collection of documented computer programs and developing user manuals with instruction and application guidelines. Phase Two is approximately 50% complete; progress to date and a vision for the final product of the PSI Toolbox are described. The needs of the power industry for specialized system identification methods are particularly acute. The industry is currently pushing to operate transmission systems much closer to theoretical limits by using real-time, large-scale control systems to dictate power flows and maintain dynamic stability. Reliably maintaining stability requires extensive system-dynamic modeling and analysis capability, including measurement-based methods. To serve this need, the BPA has developed specialized system-identification computer codes through in-house efforts and university contract research over the last several years. To make full integrated use of the codes, as well as other techniques, the BPA has commissioned Pacific Northwest Laboratory (PNL) to further develop the codes and techniques into the PSI Toolbox.

  5. Administrating Solr

    CERN Document Server

    Mohan, Surendra

    2013-01-01

    A fast-paced, example-based guide to learning how to administrate, monitor, and optimize Apache Solr.""Administrating Solr"" is for developers and Solr administrators who have a basic knowledge of Solr and who are looking for ways to keep their Solr server healthy and well maintained. A basic working knowledge of Apache Lucene is recommended, but this is not mandatory.

  6. The reform of the Indian power sector: administrations for sale. Transforming the state electricity boards into enterprises; La reforme du secteur electrique de l'Inde: administrations a vendre. Transformer les state electricity boards en entreprises

    Energy Technology Data Exchange (ETDEWEB)

    Ruet, J

    2001-10-01

    The present thesis is about the reforms in the electricity sector in India, and more specifically about those in the State Electricity Boards (SEBs), organisations responsible for generation, transmission and distribution of electricity at the level of each of the States of India. The thesis is interested in practical questions of industrial economy such as: what is the impact of de-integration on the functioning of the SEBs?, impact of the creation of regulatory committees?, of privatisation?. Going beyond the critical analysis of the proposed reforms, the thesis also puts forward certain practical propositions as regards the way of reforming the SEBs. The thesis is divided in two parts (of four chapters each). The first part analyses and characterizes the functioning of a SEB. It presents practical description of the organisational characteristics, but also of their linking to the decision making mechanisms at work. On the theoretical plane, it settles the debate on the validity of the analytical concept of soft budget constraint for a SEB, and specifies the modalities of an analysis in terms of property rights, as well as the pertinence of several concepts derived from that of cost. The second part deals with the ongoing reforms and those to be implemented. It defines the concept of enterprising and proposes a critical discussion of the ongoing reforms, in the light of the normative criterion of enterprisation. It distinguishes conceptually and in the practical analysis, the 'structural' reforms (corporatisation, de-integration, and setting up of regulatory commissions) on the one hand and the questions of privatisation on the other. It proposes a model explaining the 'trade off' between public enterprisation and rapid privatisation. The first chapter situates the SEBs in the Indian power sector, shows the limit of the analyses in terms of lack of funds or political interference. Chapter 2 makes a critical presentation of the various tools

  7. 2012 NOAA Ortho-rectified Color Mosaic of Oregon: Columbia River - Bonneville Dam to Lake Umatilla

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains ortho-rectified mosaic tiles, created as a product from the NOAA Integrated Ocean and Coastal Mapping (IOCM) initiative. The source imagery...

  8. The DOE Wide Area Measurement System (WAMS) Project: Demonstration of dynamic information technology for the future power system

    Energy Technology Data Exchange (ETDEWEB)

    Mittelstadt, W.A. [USDOE Bonneville Power Administration, Portland, OR (United States); Krause, P.E.; Wilson, R.E. [USDOE Western Area Power Administration, Golden, CO (United States); Overholt, P.N. [USDOE, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

    1996-07-01

    In 1989 the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands, in an environment where increased competition, a wider range of services and vendors, and much narrower operating margins all contribute to increased system efficiencies and capacity. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment--the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI). The WAMS project also brings added focus and resources to the evolving Western System Dynamic Information Network, or WesDINet. This is a collective response of the Western Systems Coordinating Council (WSCC) member utilities to their shared needs for direct information about power system characteristics, model fidelity, and operational performance. The WAMS project is a key source of the technology and backbone communications needed to make WesDINet a well integrated, cost effective enterprise network demonstrating the role of dynamic information technology in the emerging utility environment.

  9. 行政法视角下的高校职称评审权研究%Research on the Title Evaluation Power of Universities from the Perspective of Administrative Law

    Institute of Scientific and Technical Information of China (English)

    杨爱葵

    2012-01-01

    The power decentralization of title evaluation in universities has led to many social problems.The title evaluation essentially belongs to the category of administrative license,so the title evaluation power of universities needs to be seriously considered from the perspective of administrative law.University as an authorized administrative organ has the power to establish regulations and practice title evaluation,its exertion of authority should accord with the principle of administration according to law.Through the separation of evaluation and appointment,the autonomy in running a university can be effectively maintained.%高校职称评审权的下放引发了许多社会性问题。职称评审本质上属于行政许可范畴,需要通过行政法的视角对高校职称评审权进行认真思考。高校作为授权性行政主体,拥有规范制定权和职称评审的实施权,其权力的行使应符合依法行政的原则,通过实施评聘分离,可有效地维护高校办学自主权。

  10. Administrative Circulars

    CERN Multimedia

    Département des Ressources humaines

    2004-01-01

    Administrative Circular N° 2 (Rev. 2) - May 2004 Guidelines and procedures concerning recruitment and probation period of staff members This circular has been revised. It cancels and replaces Administrative Circular N° 2 (Rev. 1) - March 2000. Administrative Circular N° 9 (Rev. 3) - May 2004 Staff members contracts This circular has been revised. It cancels and replaces Administrative Circular N° 9 (Rev. 2) - March 2000. Administrative Circular N° 26 (Rev. 4) - May 2004 Procedure governing the career evolution of staff members This circular has also been revised. It Administrative Circulars Administrative Circular N° 26 (Rev. 3) - December 2001 and brings up to date the French version (Rev. 4) published on the HR Department Web site in January 2004. Operational Circular N° 7 - May 2004 Work from home This circular has been drawn up. Operational Circular N° 8 - May 2004 Dealing with alcohol-related problems...

  11. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  12. The power of competition

    International Nuclear Information System (INIS)

    The change-over from regulated monopolies to a non-regulated competitive market in the electric utility industry was discussed in terms of marketing and survival strategies for utilities it the newly competitive marketplace. The impact of low natural gas prices was prominently discussed as a danger to hydroelectricity generators because high efficiency turbine generators that are now available. Surplus power capacity in both the Canadian and US markets were discussed. The effects of independent power producers selling electricity wholesale to private utilities was also debated on account of its potential to change the role of the electric utility. The situation of the Bonneville Power Association (BPA), a self-financed government agency, as owner of 15 000 miles of transmission grid that is not allowed to own generation plants, was described. Strategies developed by BPA in an effort to adapt to the competitive market were described and were successful

  13. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1986-09-01

    Volumes 1 and 2 of this report are a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and are designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' These Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook (Vol. 2) is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorpoarted in the SRP.

  14. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    Volumes 1 and 2 of this report are a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and are designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' These Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook (Vol. 2) is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorpoarted in the SRP

  15. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for Nuclear Power Plant. Workbook for assessment of organization and management. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1985-08-01

    Purpose of the Workbook is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. The Workbook outlines criteria for evaluating a written organization/administration plan and ensures consistent and comprehensive review of organization plans and site visit materials. The Workbook is designed to assist the NRC reviewer in assembling and analyzing objective information deemed necessary for judging acceptability of the plan, but it does not itself make the judgment.

  16. Administrative Ecology

    Science.gov (United States)

    McGarity, Augustus C., III; Maulding, Wanda

    2007-01-01

    This article discusses how all four facets of administrative ecology help dispel the claims about the "impossibility" of the superintendency. These are personal ecology, professional ecology, organizational ecology, and community ecology. Using today's superintendency as an administrative platform, current literature describes a preponderance of…

  17. A Road Map for Success: How Northwest Manufactured Housing Conservation Efforts Revolutionized an Industry.

    Energy Technology Data Exchange (ETDEWEB)

    Gilbertson, William L.

    1993-04-01

    The evolution of an ongoing Bonneville Power Administration effort to improve the energy efficiency of manufactured homes is chronicled in this informal history. Over the past nine years, Bonneville`s manufactured housing project has undertaken many activities, including technical studies, cooperative ventures, design studies, and information dissemination. These activities are covered.

  18. Realisation of power systems and European nature conservation. The actual jurisdiction of the Federal Administrative Court; Realisierung von Energieanlagen und europaeischer Naturschutz. Die aktuelle Rechtsprechung des Bundesverwaltungsgerichts

    Energy Technology Data Exchange (ETDEWEB)

    Anger, Christoph [avocado rechtsanwaelte, Koeln (Germany)

    2011-03-15

    For a long time, the right of nature conservation and landscape conservation showed a shadowy existence in the approval of projects. Some actual decisions of the Supreme Court show that in the last years the nature conservation law developed to a central area of conflict in the licensing procedure. The contribution under consideration reports on the legal material using three selected problem areas from the law on the protection of area and law on the protection of species. On the one hand, the Federal Administrative Court (Leipzig, Federal Republic of Germany) always upgrades the requirements. However, on the other hand the Federal Administrative Court attaches great importance to practicability. The Federal Administrative Court often points to a way, how projects can be realized with a careful nature conservation related attendance also at difficult environmental conditions.

  19. Administrative Reform

    OpenAIRE

    Beh, LooSee

    2007-01-01

    This paper seeks to develop an understanding of the issues that public administrators should strive to provide in ethical practices and governance thus allowing distinctive administrative and social traditions that each country possess to flourish. Significant changes and continuities in the realm of government in contemporary China and Malaysia will be drawn upon. Recent developments have brought a sense of urgency in contrast to complacency with the status quo. This paper reviews pertinent ...

  20. Offentlig administration

    DEFF Research Database (Denmark)

    Nielsen, Elof Nellemann; Rehr, Preben René

    En undervisningsbog der henvender sig til administrationsbacheloruddannelsen. Kapitlerne er inddelt efter modulerne på uddannelsen og indeholder derfor elementer af administration, forvaltning, økonomistyring, innovation, samfundsvidenskabelige metoder og politisk styrede organisationer.......En undervisningsbog der henvender sig til administrationsbacheloruddannelsen. Kapitlerne er inddelt efter modulerne på uddannelsen og indeholder derfor elementer af administration, forvaltning, økonomistyring, innovation, samfundsvidenskabelige metoder og politisk styrede organisationer....

  1. 中国高校学术权力与行政权力冲突的根源分析--以组织制度为视角%Root cause analysis of China's university academic power and administrative power conflict--In the perspective of organization system

    Institute of Scientific and Technical Information of China (English)

    赵萍

    2015-01-01

    由于中国高校学术资源的分配一直掌握在行政权力手中,为获取更多的学术资源,学术权力与行政权力冲突日趋严重。本文以组织制度为视角,主要从内、外两方面因素对冲突的根源进行分析,即中国高校与政府关系上的政府本位和中国高校内部学术与行政关系上的行政本位。基于组织制度对学术权力与行政权力冲突的影响,提出解决出路:中国高校制度改革的规约对象的转型;完善法律依据;加强法制意识。%As China's university academic resources allocation has been controlled by administrative power, to get more and more academic resources, academic power and administrative power conflict has become increasingly serious. In this paper, in the perspective of organization system, mainly from two aspects of internal and external factors to analyze the root of the conflict, the Chinese government in terms of the relation between the university and government standard and Chinese universities internal administrative standard in terms of the relation between the academic and administrative. Based on organizational system of academic power and administrative power, the influence of conflict solution is put forward:specification of China's reform of higher education system transformation of object;Perfecting the legal basis;Strengthen the consciousness of rule of law.

  2. Normative Research on the National Education's Administrative Power List:A Case Study of the Ministry of Education Administrative Authority%国家教育行政权力清单的规范研究 ——以教育部行政权力为研究对象

    Institute of Scientific and Technical Information of China (English)

    刘虹; 张端鸿

    2016-01-01

    The system of power list is an effective means to promote the transformation of government functions and government decentralization. Through the study of the national education's administrative power list, this paper puts forward three conclusions. Firstly, ruling of the law and by the law is the basis of the power list system. Secondly, the list of administrative power in education should include not only directories sorted out by laws and regulations but also detailed information corresponding to the directories. Thirdly, the authority in educational administration should build up internal mechanisms to supervise the exercise of power and to pursue legal actions in case of abuse of power, in order to ensure the legitimate and rational exercise of power.%权力清单制度是促进政府职能转变、实现政府简政放权的一种有效手段.本文通过对国家教育行政权力清单的规范研究认为:依法梳理、设定教育行政部门职权边界是教育行政权力清单制度的基础;教育行政权力清单不仅应包括在法律法规基础上梳理出来的权力事项目录,更为重要的还应包括与事项目录相对应的事项详单;教育行政部门应当以责任清单的形式构建权力运行的内部审查机制以及权力被滥用之后的法律追究机制,以形成对教育行政权力运行的法律威慑,确保其行使的合法性和合理性.

  3. Power Lines and Crops Can Be Good Neighbors

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-08-01

    Two of the Pacific Northwest’s greatest economic assets are its wealth of agriculture and its clean and reliable electricity fueled largely by hydropower. Sometimes the two intersect. Transmission lines carrying electricity to the region’s farms, businesses and homes must, of necessity, span large areas where people grow crops and orchards. To ensure a safe and reliable flow of electricity across these expanses, trees and other vegetation must be managed to certain standards. At the same time, the Bonneville Power Administration — which owns and operates three-quarters of the region’s high-voltage transmission — recognizes the importance of our region’s agricultural bounty. We are committed to working with individuals and agricultural communities to facilitate ongoing land-use activities in transmission rights-of-way as long as those uses are compatible with transmission safety and reliability standards. Our goal with vegetation management is to keep you and your property safe while protecting the reliability of our region’s electricity system. By working together, BPA and landowners can protect the system and public safety.

  4. Administrative Reform

    DEFF Research Database (Denmark)

    Plum, Maja

    Through the example of a Danish reform of educational plans in early childhood education, the paper critically addresses administrative educational reforms promoting accountability, visibility and documentation. Drawing on Foucaultian perspectives, the relation between knowledge and governing...... of administrative technology, tracing how the humanistic values of education embed and are embedded within ‘the professional nursery teacher' as an object and subject of administrative practice. Rather than undermining the humanistic potential of education, it is argued that the technology of accounting......, implied in the reform, is analysed as a technology of accounting. A technology producing ‘the professional nursery teacher' as a reflective daily researcher, who outlives her pedagogical desire as an analytical care of the optimisation of ‘the learning child'. Thus, the paper analyses the micro physics...

  5. The Federal Administrative Court confirms unlawfulness of nuclear power moratorium. Political primacy is only valid in the bounds of justice; Bundesverwaltungsgericht bestaetigt Rechtswidrigkeit des Kernkraftmoratoriums. Primat der Politik gilt nur in den Schranken des Rechts

    Energy Technology Data Exchange (ETDEWEB)

    Leidinger, Tobias [Gleiss-Lutz Rechtsanwaelte, Duesseldorf (Germany)

    2014-03-15

    With its decision on December 20{sup th}, the Federal Administrative Court (BVwerfG) came to the legally valid conclusion that after the Fukushima nuclear power plant accident, the supervision court order related to the law on nuclear installation by the Hessian Ministry for the Environment, in order to stop operating nuclear power plants Biblis A and B for 3 months or rather not to put in operation again, was unlawful (BVwerfG 7 B 18.13 und 7 B 19.13). Beforehand, the Hessian Administrative Court (Hess. VGH) had already pronounced its judgement on February 27{sup th} 2013. The supervising orders were part of the so-called nuclear power moratorium. They were issued after the resolution of the federal government, at demand of the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) towards their nearby countries, and were identically executed by the supervisory authority of the other site-countries. Besides Biblis in Hesse, nuclear power plants in Neckarwestheim I and Philippsburg 1, Baden-Wurttemberg, Isar 1 in Bavaria, Unterweser in Lower Saxony, as well as Brunsbuettel in Schleswig-Holstein, were affected. However only RWE took legal action and was now affirmed - after the Hessian VGH verdict- by the highest German administrative court: The nuclear power moratorium - the first step to withdrawal of nuclear power in Germany - was unlawful. The decision taken by the BVerwG - as well as the one by the Hessian VGH - indicates a juridical clear and precise argumentation. The partially polemic and unobjective critic, which the VHG-verdict experienced, did not disguise, just as little as the political conflict concerning the withdrawal from nuclear energy, the view of federal judges, regarding the decision-relevant questions nor did they influence their reply. The political primacy finds its limits in the bounds of justice. Existing rights do not become thus a paper waste because there is a fundamental decision. This takes effectiveness for

  6. Computational Fluid Dynamics Modeling of the Bonneville Project: Tailrace Spill Patterns for Low Flows and Corner Collector Smolt Egress

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01

    In 2003, an extension of the existing ice and trash sluiceway was added at Bonneville Powerhouse 2 (B2). This extension started at the existing corner collector for the ice and trash sluiceway adjacent to Bonneville Powerhouse 2 and the new sluiceway was extended to the downstream end of Cascade Island. The sluiceway was designed to improve juvenile salmon survival by bypassing turbine passage at B2, and placing these smolt in downstream flowing water minimizing their exposure to fish and avian predators. In this study, a previously developed computational fluid dynamics model was modified and used to characterized tailrace hydraulics and sluiceway egress conditions for low total river flows and low levels of spillway flow. STAR-CD v4.10 was used for seven scenarios of low total river flow and low spill discharges. The simulation results were specifically examined to look at tailrace hydraulics at 5 ft below the tailwater elevation, and streamlines used to compare streamline pathways for streamlines originating in the corner collector outfall and adjacent to the outfall. These streamlines indicated that for all higher spill percentage cases (25% and greater) that streamlines from the corner collector did not approach the shoreline at the downstream end of Bradford Island. For the cases with much larger spill percentages, the streamlines from the corner collector were mid-channel or closer to the Washington shore as they moved downstream. Although at 25% spill at 75 kcfs total river, the total spill volume was sufficient to "cushion" the flow from the corner collector from the Bradford Island shore, areas of recirculation were modeled in the spillway tailrace. However, at the lowest flows and spill percentages, the streamlines from the B2 corner collector pass very close to the Bradford Island shore. In addition, the very flow velocity flows and large areas of recirculation greatly increase potential predator exposure of the spillway passed smolt. If there is

  7. 基于物联网供电所仓储建设与远程物料使用监控技术%Warehouse Construction of Power Supply Administration Based on Networking Materials and Remote Material Using Monitoring Techniques

    Institute of Scientific and Technical Information of China (English)

    吴宇红; 章建森

    2014-01-01

    针对供电所仓储物料进出库标准化和规范化管理问题,对 GPRS移动终端、RFID射频电子标签、PDA 手持终端和无线电子秤等进行研究,对出库物料至作业现场使用情况监管进行归纳,提出一种基于物联网供电所仓储与远程物料使用监控系统。研究结果表明,该监控系统能实时监管供电所仓储入库、出库、使用、退库、评估和盘点,有效进行精益化管理,实现抢修物料快速出库及作业现场工程质量的监管。%In view of the problems that exist in the import library standard of the warehouse material in the administration of power supply and standardization management,the paper studies the GPRS mobile terminal, Label of RFID and wireless electronic scale,sums up monitoring and management from the material out of the warehouse to the operation site,and suggests a monitoring system based on the warehouse networking material of the power supply administration and remote material using.The result shows that the system can real timely monitor the situations of the materials in and out of the warehouse of the power supply administration,during being used,returned,assessed or checked which can effectively help to conduct lean management,and help to achieve monitoring and management for repair materials rapidly out of the warehouse and the good quality of the engineering on the operation site.

  8. Database Administrator

    Science.gov (United States)

    Moore, Pam

    2010-01-01

    The Internet and electronic commerce (e-commerce) generate lots of data. Data must be stored, organized, and managed. Database administrators, or DBAs, work with database software to find ways to do this. They identify user needs, set up computer databases, and test systems. They ensure that systems perform as they should and add people to the…

  9. Administrative IT

    Science.gov (United States)

    Grayson, Katherine, Ed.

    2006-01-01

    When it comes to Administrative IT solutions and processes, best practices range across the spectrum. Enterprise resource planning (ERP), student information systems (SIS), and tech support are prominent and continuing areas of focus. But widespread change can also be accomplished via the implementation of campuswide document imaging and sharing,…

  10. EMERGENCY RESPONSE OF THE ADMINISTRATION OF THE FEDERAL SERVICE FOR SURVEILLANCE ON CONSUMER RIGHTS PROTECTION AND HUMAN WELL-BEING IN SAKHALIN REGION TO THE FUKUSHIMA NUCLEAR POWER PLANT ACCIDENT

    Directory of Open Access Journals (Sweden)

    B. B. Darizhapov

    2011-01-01

    Full Text Available The article describes the experience of the Administration of the Federal Service for Surveillance on Consumer Rights Protection and Human Well-being in Sakhalin Region in organizing prevention of conditions that endanger the public radiation safety related to the nuclear accident at the Fukushima nuclear power plant. The authors present results of the measurements of the radiation situation in the Sakhalin region and propose ways to improve organizational and sanitary-hygienic measures aimed on ensuring public protectiony in events of radiation accidents.

  11. The Study on Privilege in Administrative Contract

    Institute of Scientific and Technical Information of China (English)

    于韬文

    2016-01-01

    With the continuous development of management methods, as the implementation means of administrative policy and social management ideal, the administrative contract has been widely accepted. Administrative areas contract to become the focus of people's attention. Administrative priority in administrative contract is to distinguish between private rights contract with the most critical characteristics of administrative contracts. But there are many problems of administrative priority in practice. In this paper, writer begins from the content of administrative priority and put forward myself proposals for the improvement of power supervision.

  12. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

    2009-09-01

    This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

  13. Quantifying the behavioral response of spawning chum salmon to elevated discharges from Bonneville Dam, Columbia River, USA

    Science.gov (United States)

    Tiffan, K.F.; Haskell, C.A.; Kock, T.J.

    2010-01-01

    Chum salmon Oncorhynchus keta that spawn in main-stem habitats below Bonneville Dam on the Columbia River, USA, are periodically subjected to elevated discharges that may alter spawning behaviour. We investigated behavioural responses of spawning chum salmon to increased water velocities associated with experimental increases in tailwater elevation using acoustic telemetry and a dual-frequency identification sonar. Chum salmon primarily remained near their redds at base tailwater elevations (3.5 m above mean sea level), but displayed different movement and behavioural responses as elevations were increased to either 4.1 or 4.7m for 8-h periods. When velocities remained suitable (activity as water velocities increased. However, when velocities exceeded 0.8m s-1, the females that remained on their redds exhibited increased swimming activity and digging virtually ceased. Female and male chum salmon that left their redds when velocities became unsuitable moved mean distances ranging from 32 to 58 m to occupy suitable velocities, but returned to their redds after tailwaters returned to base levels. Spawning events (i.e. egg deposition) were observed for five of nine pairs of chum salmon following tests indicating any disruptions to normal behaviour caused by elevated tailwaters were likely temporary. We believe a chum salmon's decision to either remain on, or leave, its redd during periods of unsuitably high water velocities reflects time invested in the redd and the associated energetic costs it is willing to incur. ?? 2009 John Wiley & Sons, Ltd.

  14. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  15. Control over Administrative Contract Formation

    Directory of Open Access Journals (Sweden)

    Frane Staničić

    2016-02-01

    Full Text Available Administrative contracts in Croatian legislation represent a novelty introduced into the General Administration Procedure Act in 2010. This is a novelty which has not proved to be successful in practice. Control over administrative contract formation is inevitable and is very significant for a number of reasons. Firstly, public legal bodies which form them do so by exercising their own public powers which are without doubt subject to legality control; secondly, in forming administrative contracts, public funds are used which must be controlled; thirdly, forming administrative contracts often touches on using public goods. Due to the restrictive interpretation of administrative contracts in Croatian legislation, this institute is indisputably only regulated in the General Taxation Act. However, for more than two decades contracts which satisfy all presumptions have existed in our law in order to be considered as administrative contracts. It is for this reason that control over contracts will be dealt with for contracts considered by the author to be administrative contracts. These are contracts on concessions and contracts on public procurement. How inadequate today’s regulation of control of administrative contract formation is will be demonstrated, particularly regarding contracts on concession and public procurement. Legislative changes will be proposed which should result in a more quality system of control over administrative contract formation. How control over administrative contract formation cannot be considered as separate from control over administrative contract execution will also be shown.

  16. Movement Patterns and Multi-Scale Factors That Influence Exotic Brook Trout And Endemic Bonneville Cutthroat Trout Distribution And Abundance In The Mill Creek Drainage, Utah

    OpenAIRE

    Nadolski, Benjamin Keith

    2008-01-01

    Introduced brook trout (Salvelinus fontinalis) are implicated as a primary factor leading to the decline in distribution and abundance of native cutthroat trout (Oncorhynchus clarkii). However, not all introductions are successful, suggesting local conditions influence the success of invasions. Therefore, I sought to determine the multi-scale factor(s) that influence brook trouts’ invasion success of native Bonneville cutthroat trout (Oncorhynchus clarkii utah) habitats in Mill Creek, Utah. I...

  17. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    International Nuclear Information System (INIS)

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam. In 2008, the Portland District of the U.S. Army Corps of Engineers contracted with the Pacific Northwest National Laboratory (PNNL) to conduct an acoustic telemetry study to evaluate a newly deployed 700-ft-long and 10-ft-deep behavioral guidance structure (BGS) located in the forebay of the Bonneville Dam second powerhouse (B2) and to estimate the survival of yearling Chinook salmon, subyearling Chinook salmon, and juvenile steelhead passing downstream through this powerhouse. The BGS was deployed to increase the survival of fish passing B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector, a surface flow outlet known to be a relatively benign route for downstream passage at this dam. Fish longer than 95 mm were surgically implanted with Juvenile Salmon Acoustic Telemetry System (JSATS) and passive integrated transponder (PIT) tags, held overnight in tanks supplied with continuous flow of river water to allow time for recovery from surgery and released upstream as part of two concurrent survival studies that were evaluating survival at John Day Dam and the Bonneville spillway. Tagged fish were released at or downstream of Arlington, Oregon, approximately 156 km upstream on the Columbia River. Additional release points included the tailwaters of John Day Dam and The Dalles Dam. The volitional movements of the tagged migrants were subsequently tracked through the B2 forebay to their eventual route of passage. Passage location was recorded and incorporated with detections from three downstream survival arrays to produce survival estimates. The tracked positions of fish in the forebay and passage distribution at B2 were evaluated to determine behavior relative to the BGS location.

  18. Cooperation of Leaders of CCP and Administrators from the Angle of Power Resource%从权力来源的视角论新形势下科研院所的党政配合

    Institute of Scientific and Technical Information of China (English)

    顾东黎

    2011-01-01

    Administrator responsibility system under the leader of Chinese Communist Party committee is accepted by research academies and institutes universally.With the change of social politics, economic surroundings and reform of cadre and personnel, it is very important to optimize this system.The writer demonstrates this system rational and legitimate from the angle of power resource, and analyzes it by the means of administration.The effective means of cooperation between administrative leaders and CCP leaders are founded.%党委领导下的院所长负责制是目前科研院所普遍实行的一种管理体制,随着社会政治、经济环境的变化以及人事制度改革.人才发展的需要,如何更好地发挥这一体制在科研院所的作用显得尤其重要.从权力来源角度的分析充分肯定了这一体制存在的合理、合法性,进而做行政学的分析,提出加强科研院所党政权力配合的有效途径.

  19. 75 FR 15430 - Chief Joseph Hatchery Program

    Science.gov (United States)

    2010-03-29

    ... Bonneville Power Administration Chief Joseph Hatchery Program AGENCY: Bonneville Power Administration (BPA... announces the availability of the ROD to implement the proposed action identified in BPA's Chief Joseph Hatchery Program Environmental Impact Statement (DOE/EIS-0384, November 2009). BPA has decided to fund...

  20. 75 FR 39241 - Hooper Springs Project

    Science.gov (United States)

    2010-07-08

    ... Bonneville Power Administration Hooper Springs Project AGENCY: Bonneville Power Administration (BPA... Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would be... 115-kV Lane Creek Substation, east of the City of Wayan, Idaho. The proposed project would...

  1. ADMINISTRATIVE CIRCULARS

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    N° 2 (Rev. 1) - March 2000Guidelines and procedures concerning recruitment and probation period of staff membersN° 9 (Rev. 2) - March 2000Staff members contractsN° 16 (Rev. 2) - January 2000TrainingN° 30 (Rev. 1) - January 2000Indemnities and reimbursements upon taking up appointment and termination of contractN° 32 - February 2000Principles and procedures governing complaints of harassmentThese circular have been amended (No 2, N° 9, N° 16 and N° 30) or drawn up (N° 32).Copies are available in the Divisional Secretariats.Note:\tAdministrative and operational circulars, as well as the lists of those in force, are available for consultation in the server SRV4_Home in the Appletalk zone NOVELL (as GUEST or using your Novell username and password), volume PE Division Data Disk.The Word files are available in the folder COM, folder Public, folder ADM.CIRC.docHuman Resources DivisionTel. 74128

  2. 试论我国行政权力监督缺位的根源及治理对策∗%On the Origin of Supervision Vacancy and Countermeasures to the Administrative Power

    Institute of Scientific and Technical Information of China (English)

    段朝晖; 马存娟; 杨公科

    2016-01-01

    s:administrative power is the core of public power.If administrative power supervision mechanism is not in place,the appearance of corruption is inevitable.At present,the study of corrup-tion,must start from the restriction of power supervision mechanism,to find the cause of its produce and management countermeasures.The author thinks that the cause of the current power corruption in China is mainly displays in:normal power restriction mechanism does not reach the designated po-sition,party supervisory mechanism can play a role not ideal,social supervision mechanism can be e-vaded,judicial supervision mechanism is difficult to carry out.Therefore,supervision and restraint of administrative power to obtain from the following aspects:first,establish a reasonable set of adminis-trative power,listing system,speed up the power of the government,with emphasis on the scientific definition of government functions,the power restriction mechanism;Secondly,set up the system of discipline inspection departments vertical leadership,expanding the scope of the inner-party democra-cy,improve Democratic Party supervision mechanism;Third,improving the capacity of the supervi-sion of the public,improve the system of letter-inquiring-and-accusing social supervision mechanism;Fourthly,build system of cross region of the people’s court and procuratorate,break the judicial pro-tection,an effective mechanism of judicial supervision.Process,the construction of the four major supervision mechanism of power restriction mechanism is the key operation,party supervision and so-cial supervision is an important part of the judicial supervision is fundamental.Only in this way,can the cage QuanLiGuan into system,formed from corruption, not corruption, don’t want to rot effective mechanism.%行政权力是公权力的核心。如行政权力的监督机制不到位,则腐败的出现就是不可避免的。对腐败问题的研究,必须从权力运行的制约监督机制入手,才能找

  3. A Shift of Power

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Administrative reforms are shifting prefecture government powers to the county level in an effort to boost local economies on July 8, the government of China’s southernmost Hainan Province announced that it was to hand over 177 of its administrative powers to county-level governments. The move practically dismantled the powers of the

  4. Administrative decisions

    International Nuclear Information System (INIS)

    On 17 January 2002, the Finnish Council of State (the Government) had issued a positive Decision in Principle on the application made by the utility Teollisuuden Voima Oy (TVO) to construct a new nuclear power plant unit (see Nuclear Law Bulletin No. 69). At that time, the Council of State also declared that the liability amount of nuclear operators should be raised significantly, and three ministers issued a statement according to which the 1987 Nuclear Energy Act (the text of this Act is reproduced in the Supplement to Nuclear Law Bulletin No. 41) should be amended to ensure that the nuclear operator has to bear liability for the costs of radioactive waste management for 50 years after the repository has been closed. (author)

  5. 20 CFR 901.43 - Administrative Law Judge.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Administrative Law Judge. 901.43 Section 901... Termination of Enrollment § 901.43 Administrative Law Judge. (a) Appointment. An administrative law judge... Administrative Law Judge. Among other powers, the Administrative Law Judge shall have authority, in...

  6. ROLE OF HOSPITAL ADMINISTRATION

    OpenAIRE

    UDAYSINH R. MANEPATIL

    2013-01-01

    Hospital administration is the management of the hospital as a business. The administration is made up of medical and health services managers (sometimes called health care executives and health care administrators) and assistant administrators. Administrations range in size and the duties of the administrator depends on the size of the administration.

  7. Research on the mode of the operation of the administrative power under the environment of electronic government%电子政务环境下行政权力运行方式研究

    Institute of Scientific and Technical Information of China (English)

    彭宗政

    2012-01-01

    分析了电子政务在线事务处理基本特征,针对涉及跨政府组织和部门提供一体化电子公共服务现状,提出了影响其运行和发展的诸因素.在研究相关文献基础上,重点分析了权力因素对电子政务在线事务处理的影响,构建了在电子政务环境下行政权力在结构、流转、授权方式、运行监督等方面模式,以期丰富政府信息化架构(GIA)理论体系.%This article analyses the basic characteristics of the online business used in the electronic government, putting forward several elements which make effects on the operation and development of the integration E-government public service provided by transgovernments and organizations. Based on the related scientific literatures, the article puts emphasis on the influences made by the power element on the on-line business of E-government, building the modules of the structure, circulation, empowering pattern and operation regulation of the administrative power under the environment of electronic government in order to enrich the theoretical system of GIA.

  8. Economical Radioisotope Power Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Almost all robotic space exploration missions and all Apollo missions to the moon used Radioisotopic Thermoelectric Generators (RTGs) to provide electrical power...

  9. Spacecraft Power Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase I project will develop the Spacecraft Power Monitor (SPM) which will use non-intrusive electrical monitoring (NEMO). NEMO transforms the power...

  10. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  11. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  12. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  13. 2012 NOAA Ortho-rectified Near-Infrared Mosaic of Oregon: Columbia River - Bonneville Dam to Lake Umatilla

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains ortho-rectified mosaic tiles, created as a product from the NOAA Integrated Ocean and Coastal Mapping (IOCM) initiative. The source imagery...

  14. Administrative Appeals and ADR in Danish Administrative Law

    DEFF Research Database (Denmark)

    Conradsen, Inger Marie; Gøtze, Michael

    2014-01-01

    Administrative Appeals, review, administrative tribunals, ombudsman, alternative dispute resolution......Administrative Appeals, review, administrative tribunals, ombudsman, alternative dispute resolution...

  15. 2011 Annual Report [WESTERN AREA POWER ADMINISTRATION

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-01-01

    Western’s achievements for 2011 are reported and include: Experienced a banner water year – meaning more hydropower delivered; Changed energy scheduling— to better support intermittent renewable resources; Maintained reliability— ensuring maximum use of the grid by reducing the frequency and duration of planned and unplanned outages; Connected communities— providing customers energy products and related services at cost-based rates; Managed transmission projects.

  16. Southwestern Power Administration 1993 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This booklet is divided into an overview (mission statement, map, performance, etc.), the year in review, financial and statistical report, financial and statistical report, financial and statistical data, and SPA organization.

  17. Coordinated Multi-Objective Control of Regulating Resources in Multi-Area Power Systems with Large Penetration of Wind Power Generation

    DEFF Research Database (Denmark)

    Nyeng, Preben; Yang, Bo; Ma, Jian;

    2008-01-01

    . The means are utilization of flywheel energy storage units, hydro power generation, and energy exchange among the participating control areas. The objective of the control algorithm is to respond to the control signals from the different system operators, whilst optimizing the hydro power plant operation...... by reducing the tear and wear on the mechanical parts and improving the energy efficiency of the plant. The performance of the WAEMS is simulated using a mathematical model, including hydro power plant and flywheel energy storage models. ACE measurements from the California ISO and Bonneville Power...

  18. LGR adult trap data - Operation of the adult trap at Lower Granite Dam

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This Bonneville Power Administration (BPA) - funded project pays for NOAA staff to operate the adult salmon trap located in the fish ladder at Lower Granite Dam....

  19. Water Quality - Monitoring the migrations of wild Snake River spring/summer Chinook salmon juveniles

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This is an ongoing Bonneville Power Administration funded project to annually collect, PIT tag, and release wild Chinook salmon parr in up to 17 streams of the...

  20. PIT Tag data - Monitoring the migrations of wild Snake River spring/summer Chinook salmon juveniles

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This is an ongoing Bonneville Power Administration funded project to annually collect, PIT tag, and release wild Chinook salmon parr in up to 17 streams of the...

  1. 14 CFR 302.17 - Administrative law judges.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Administrative law judges. 302.17 Section... Evidentiary Hearing Proceedings § 302.17 Administrative law judges. (a) Powers and delegation of authority. (1) An administrative law judge shall have the following powers, in addition to any others specified...

  2. 18 CFR 1310.3 - Assessment of administrative charge.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Assessment of administrative charge. 1310.3 Section 1310.3 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY ADMINISTRATIVE COST RECOVERY § 1310.3 Assessment of administrative charge. (a) Range of charges. Except...

  3. Senior Administrators Should Have Administrative Contracts.

    Science.gov (United States)

    Posner, Gary J.

    1987-01-01

    Recognizing that termination is viewed by the employee as the equivalent to capital punishment of a career, an administrative contract can reduce the emotional and financial entanglements that often result. Administrative contracts are described. (MLW)

  4. BPA Statutes.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1999-08-01

    This report contains the Bonneville Power Administration's (BPA's) authorizing statutes--the Bonneville Project Act, the Federal Columbia River Transmission System Act, the Pacific Northwest Electric Power Planning and Conservation Act and other laws that contain provisions that define BPA's mission and affect the way it is carried out.

  5. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  6. 49 CFR 386.54 - Administrative Law Judge.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Administrative Law Judge. 386.54 Section 386.54... General Rules and Hearings § 386.54 Administrative Law Judge. (a) Powers of an Administrative Law Judge. The Administrative Law Judge may take any action and may prescribe all necessary rules and...

  7. Hatchery Evaluation Report / Bonneville Hatchery - Urb Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1996-05-01

    This report presents the findings of the independent audit of the Bonneville Hatchery (Upriver bright [URB] Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of at two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

  8. Hatchery Evaluation Report / Bonneville Hatchery - Tule Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1996-05-01

    This report presents the findings of the independent audit of the Bonneville Hatchery (Tule Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

  9. Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

    2008-03-12

    The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

  10. Administration in an operating plant

    International Nuclear Information System (INIS)

    The importance of strict administrative procedures in the daily work is being demonstrated by commenting on events that occured in the operation of German nuclear power plants. The procedure for working in an area of the plant (pressurized medium, high-radioactive level, explosive of flammable mediums), where special measures for safe working have to be taken, is discussed in detail. The administrative problems during refuelling time are further on mentioned, especially the problems connected with administering more than 1,000 people with respect to health protection and sabotage protection. Some general comments on the influences from external causes (authorities, courts, etc.) are given. (orig./ORU)

  11. Issues and Ideas: Organization, Administration and Supervision.

    Science.gov (United States)

    Miller, Irving

    1982-01-01

    This article discusses the basic characteristics of organization, administration, supervision, and specific problems of human service organizations and relates them to the concept of power. The author proposes an integration of the two models of supervision so that the administrative and teaching functions will both be served. (Author)

  12. Administrative Data Repository (ADR)

    Data.gov (United States)

    Department of Veterans Affairs — The Administrative Data Repository (ADR) was established to provide support for the administrative data elements relative to multiple categories of a person entity...

  13. EPA Administrative Enforcement Dockets

    Data.gov (United States)

    U.S. Environmental Protection Agency — The EPA Administrative Enforcement Dockets database contains the electronic dockets for administrative penalty cases filed by EPA Regions and Headquarters. Visitors...

  14. Organization/Administration.

    Science.gov (United States)

    Chaffee, Ellen Earle

    Patterns that emerged from reviewing 26 syllabi for courses on organization and administration in higher education are discussed, and six sample syllabi are presented. The syllabi focused more on organization than administration. Of the 26 syllabi, 19 dealt with organization and administration generally; 5 with administration in a specific…

  15. Professor Runs the College:Origin of the Boundary Setting between Administrative Power and Academic Power%教授治院:中国大学行政权力与学术权力边界设置的原点

    Institute of Scientific and Technical Information of China (English)

    刘广明

    2015-01-01

    The key measure to promote academic power in Chinese universities is to set a reasonable boundary between administrative power and academic power. It’s better to set up institution of professor running the college in secondary colleges as the origin of the boundary. The theory basis of professor running the college is academic community,the essence of which is to share the power and to pursue the truth. The institution of professor running the college should embody the principles of open and fair and balancing the power. This institution has the legality in practice,and fit for the organizational features of the university. The importance for the institution of professor running the college playing the role as the origin of the boundary is to make sure of the points as following:Using scientific ideas as the precursor;using fitful governance institutes as the carrier;using the perfect institutions as guarantee,only by which can the institution of professor running college not to descend to the pitfall of the new bu_reaucratic model.%中国大学张扬学术权力的关键举措是在行政权力与学术权力二者之间设置合理的边界,设置边界的原点宜在大学二级学院实施教授治院。教授治院的理论依据是学术共同体理论,其精髓是均权和求真,教授治院必须体现公开公正和均权制衡二大原则。实践中,教授治院具有实施的合法性基础,也符合大学的组织特征。但要使教授治院真正起到边界原点的作用,还应该以科学的治理理念为先导,以适切的治理机构为载体,以完善的治理制度为保障,防止教授治院陷入新的官僚化模型之陷阱。

  16. 20th Anniversary Conference on World Bank Administrative Tribunal

    CERN Document Server

    2000-01-01

    Contents :"Review of discretionary power by international administrative tribunals" by Michel Gentot, "Checks exerted by administrative tribunals over the discretionary powers of international organizations" by Nicolas Valticos, "Comments" by Ranjan (C.F.) Amerasinghe, "The review of managerial discretion by international administrative tribunals" by Francisco Orrego Vicuña, "Some practical issue arising in international administrative tribunals" by Nassib G. Ziadé, "Aspects of judicial review of administrative action in the WBAT with comparative remarks" by Spyridon Flogaitis, "The International Monetary Fund Administrative Tribunal : its first six years" by Celia Goldman

  17. ORGANIZATION OF PUBLIC ADMINISTRATION

    OpenAIRE

    Mrkša, Jožica

    2012-01-01

    In the thesis titled Organization of Public Administration I concentrated in the review of national and foreign literature. My decision for this topic is based on the personal interest and relevance of the topic in this particular period of time. The purpose of my work was to present the public administration in general, with focus in public administration of Slovenia. At first, the theoretical background of public administration is presented, with following topics addressed: public administr...

  18. A Maximum Power Tracker for Improved Thermophotovoltaic Power Generation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Radioisotope Power Systems (RPS) are critical for future flagship exploration missions in space and on planetary surfaces. Small improvements in the RPS...

  19. 基于BPA的电网暂态稳定性概率评估%Probabilistic Transient Stability Assessment of Power System Based on BPA

    Institute of Scientific and Technical Information of China (English)

    陈浩; 张焰; 房鑫炎

    2007-01-01

    以研究电网暂态稳定性为目的,应用概率性方法进行分析计算,并以此来评估电网的暂态稳定情况,主要考虑了两个因素:电网故障的随机性和电力负荷变化的随机性,并在此基础上提出了用于评估电网暂态稳定性的概率指标,同时利用VC++灵活便捷的控制语言以及BPA(Bonneville Power Administration)软件计算暂态稳定的快速准确性,研究了适用于大型复杂电网暂态稳定性概率评估的接口技术,通过该接口技术希望能够大大地减少计算分析的时间.最后,通过对IEEE-9节点网络以及我国华东某地区2010年220kV规划电网进行分析计算,验证了所提方法的有效性同时证明了速度可以得到大大地减少.

  20. 基于BPA对配电网无功优化的研究%Study on Reactive Power Optimization of Distribution Networks in View of BPA

    Institute of Scientific and Technical Information of China (English)

    张磊; 任惠; 胡文平; 金超; 滕卫军

    2011-01-01

    对配电网无功优化中的补偿设备安装位置和补偿容量进行了研究,首先介绍了无功功率补偿的原则和方法,然后对配电网4种补偿方案进行了详细分析和对比,认为:对功率因数较低的变电站及线路应采用配电线路固定补偿方案.以河北南网某县级电网为算例,使用潮流计算软件BPA(Bonneville Power Administration)无功优化模块以及配电线路无功优化常用的"三分之二法则"进行无功优化的计算,确定了补偿设备的安装位置和补偿容量,对优化效益进行了分析.最后,给出了配电网无功优化的合理建议.

  1. Transportation Security Administration

    Science.gov (United States)

    ... content Official website of the Department of Homeland Security Transportation Security Administration A - Z Index What Can I Bring? Search form Apples Main menu Administrator Travel Security Screening Special Procedures TSA Pre✓® Passenger Support Travel ...

  2. Cloudera administration handbook

    CERN Document Server

    Menon, Rohit

    2014-01-01

    An easy-to-follow Apache Hadoop administrator's guide filled with practical screenshots and explanations for each step and configuration. This book is great for administrators interested in setting up and managing a large Hadoop cluster. If you are an administrator, or want to be an administrator, and you are ready to build and maintain a production-level cluster running CDH5, then this book is for you.

  3. Understanding land administration systems

    OpenAIRE

    P. Williamson, Ian; Enemark, Stig; Wallace, Judy; Rajabifard, Abbas

    2008-01-01

    This paper introduces basic land administration theory and highlights four key concepts that are fundamental to understanding modern land administration systems - firstly the land management paradigm and its influence on the land administration framework, secondly the role that the cadastre plays in contributing to sustainable development, thirdly the changing nature of ownership and the role of land markets, and lastly a land management vision that promotes land administration in support of ...

  4. Refinement for administrative policies

    OpenAIRE

    Dekker, M.A.C.; Etalle, S.

    2007-01-01

    Flexibility of management is an important requisite for access control systems as it allows users to adapt the access control system in accordance with practical requirements. This paper builds on earlier work where we defined administrative policies for a general class of RBAC models. We present a formal definition of administrative refinnement and we show that there is an ordering for administrative privileges which yields administrative refinements of policies. We argue (by giving an examp...

  5. Prognostics of Power MOSFET

    Data.gov (United States)

    National Aeronautics and Space Administration — This paper demonstrates how to apply prognostics to power MOSFETs (metal oxide field effect transistor). The methodology uses thermal cycling to age devices and...

  6. Radioisotope Power Supply Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Between 1998 and 2003, Hi-Z Technology developed and built a 40 mW radioisotope power supply (RPS) that used a 1 watt radioisotope heater unit (RHU) as the energy...

  7. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  8. Waivering as Governance: Federalism during the Obama Administration

    Science.gov (United States)

    Saultz, Andrew; McEachin, Andrew; Fusarelli, Lance D.

    2016-01-01

    This article analyzes how the Obama administration used executive power to grant waivers from federal education policies and assesses whether they used this power differently than previous administrations and in other sectors (e.g., health or welfare). The executive use of waivers to shape state policy is not a new trend. However, we find that…

  9. Bureaucratic Administration in Modern Society

    Directory of Open Access Journals (Sweden)

    Goga Gina Livioara

    2009-06-01

    Full Text Available In the European states, a responsible administration, from a political point of view,coordinated by law, competent and professional and neutral from a public point of view, has been thebasis for the European state for a long time and a dominant model of this type of administration isrepresented by the Weberian bureaucratic model, which emphasized the value of efficiency, consistency,continuity and predictability. Bureaucracy is indispensable in any state and very important in thedemocratic regimes. Weber asserted that the bureaucratic organisation obtained power in virtue of thedecrease of the economical and social differences. The modern state depends on a bureaucratic basis,but once established, bureaucracy is among the social structures that are most difficult to eliminate. Theemergence and development of the bureaucratic mechanisms has become a monster of the modernsociety, because the bureaucracy works in the opposite direction from democracy.

  10. Population patterns in World's administrative units

    CERN Document Server

    Fontanelli, Oscar; Cocho, Germinal; Li, Wentian

    2016-01-01

    While there has been an extended discussion concerning city population distribution, little has been said about administrative units. Even though there might be a correspondence between cities and administrative divisions, they are conceptually different entities and the correspondence breaks as artificial divisions form and evolve. In this work we investigate the population distribution of second level administrative units for 150 countries and propose the Discrete Generalized Beta Distribution (DGBD) rank-size function to describe the data. After testing the goodness of fit of this two parameter function against power law, which is the most common model for city population, DGBD is a good statistical model for 73% of our data sets and better than power law in almost every case. Particularly, DGBD is better than power law for fitting country population data. The fitted parameters of this function allow us to construct a phenomenological characterization of countries according to the way in which people are d...

  11. SolidWorks Administration Bible

    CERN Document Server

    Lombard, Matt

    2009-01-01

    What you need to prepare, install, and maintain SolidWorks. It's not enough to know how to use SolidWorks, if your job also requires you to install or maintain it, train new users, and implement standards. This in-depth guide was written for those of you who have to actually manage your company's SolidWorks system. From hardware selection to helping users to licensing and more, this is the everyday, bread-and-butter SolidWorks administration resource that IT and CAD managers have been seeking.:; SolidWorks is a powerful 3D solid modeling system that is popular with CAD users everywhere, but of

  12. Federal Energy Administration's contract with the Advertising Council, Inc. , for a public relations campaign on the need to save energy. Report to the chairman, Subcommittee on Energy and Power, House Committee on Interstate and Foreign Commerce

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-31

    This report is in response to a request for an audit of the Federal Energy Administration's contract with The Advertising Council, Inc., for a public-service advertising campaign on energy conservation. Significant aspects of the audit are summarized in the report's digest.

  13. Research to Identify Effective Antifungal Agents, 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Carl

    1993-10-01

    This study is a continuation of ``Research to Identify Effective Antifungal Agents'' sponsored by Bonneville Power Administration (Schreck et al. 1990, 1991, and 1992). The objectives of the present study were to select and evaluate candidate fungicides.

  14. Columbia River Basin Seasonal Volumes and Statistics, 1928-1989. 1990 Level Modified Streamflows Computed Seasonal Volumes 61-Year Statistics.

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Crook Company

    1993-04-01

    This report was prepared by the A.G. Crook Company, under contract to Bonneville Power Administration, and provides statistics of seasonal volumes and streamflow for 28 selected sites in the Columbia River Basin.

  15. Research to Identify Effective Antifungal Agents, 1991 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Carl

    1991-09-01

    This study is a continuation of ``Research to Identify Effective Antifungal Agents'' sponsored by Bonneville Power Administration (Schreck et al. 1990). The objectives of the present study was to evaluate up to 10 candidate fungicides.

  16. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2)

    Energy Technology Data Exchange (ETDEWEB)

    Barndt, Shawn L. [Bonneville Power Administration, Portland, OR (United States)

    2003-04-04

    Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways

  17. A Study to Determine the Biological Feasibility of a New Fish Tagging System; Annual Report 1994-1996.

    Energy Technology Data Exchange (ETDEWEB)

    Downing, Sandra L.; Frost, Deborah A.; Jonasson, Bruce F.; Nunnallee, Edmund P.; Peterson, Bradley W.; Prentice, Earl F.; Snell, Glen A.

    1998-11-01

    A multiyear program to evaluate the technical and biological feasibility of a new identification system for salmonids established between the Bonneville Power Administration (BPA) and the National Marine Fisheries Service (NMFS) in 1983.

  18. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project... Puget Sound Energy Inc., a Large Generator Interconnection Agreement for interconnection of up to...

  19. Evaluation of a Low-Cost Salmon Production Facility, 1984 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hickerson, Andrew W.; Hill, James M.

    1984-12-01

    This fiscal year 1984 study sponsored by the Bonneville Power Administration evaluates the presently existing low-cost salmon production facility operated and maintained by the Clatsop Economic Development Committee's Fisheries Project.

  20. Tucannon Stream/Riparian Restoration : Fiscal Year 1998 Habitat Projects.

    Energy Technology Data Exchange (ETDEWEB)

    Bruegman, Terry; Nordheim, Debbie

    1999-01-01

    In 1993 the Tucannon River was selected by the Bonneville Power Administration to be one of the three Washington Model Watersheds. This plan was developed to identify, protect, and restore fish habitat by utilizing sound technical information and citizen input.

  1. Annual stock assessment – CWT (USFWS): Annual report 2003

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 1989 the Bonneville Power Administration (BPA) began funding the evaluation of production groups of juvenile anadromous fish not being coded-wire tagged for...

  2. Emergent situation and rule of administrative law%紧急状态与行政法治

    Institute of Scientific and Technical Information of China (English)

    江必新

    2007-01-01

    Emergent administrative power is a necessary power for dealing with emergent situation. Although different emergent administrative powers under different constitutional systems are different in content, they share the same logic structure. The establishment and the execution of the emergent administrative power shall be subject to the regulation of law. The regulation of emergent administrative power requires for the adoption of various measures with attention to the balance of values.

  3. Personality Traits and Administrators

    OpenAIRE

    Anitha V

    2008-01-01

    Administration is the art of getting tasks done by utilizing the resources and coordinating the people. Administrators give trigger to the administration by coordinating, and directing all parts of an organization by managing the tangible and intangible resources of the organization. The qualities of leadership are therefore a critical determinant of organizational success. The theories of leadership (Trait to Transformational leadership theory) have strived to look into the aspects that make...

  4. Veterans Administration Databases

    Science.gov (United States)

    The Veterans Administration Information Resource Center provides database and informatics experts, customer service, expert advice, information products, and web technology to VA researchers and others.

  5. A Comparison of Climate Change in the Lahontan and Bonneville Basins with the GISP2 δ18O Record for the Period 45-11 cal ka (Invited)

    Science.gov (United States)

    Benson, L. V.; Lund, S.; Smoot, J.

    2010-12-01

    Paleomagnetic-secular-variation (PSV)-based age models for sediment cores from Pyramid Lake in the Lahontan Basin and the Blue Lake marshes in the Bonneville Basin were used to construct sedimentologic, isotopic, and mineralogic proxies of lake-size variation for the two pluvial lake systems for the period 45-11 cal ka (hereafter ka). Both PSV records indicate the presence of the Mono Lake and Laschamp excursions. These data, together with outcrop-based envelopes of lake-level variability, indicate that relatively dry intervals were associated with cold North Atlantic Heinrich events and relatively wet intervals were associated with warm Dansgaard-Oeschger interstades prior to the achievement of maximum pluvial conditions at ~15.5 ka. After this time, major wet intervals in both basins that occurred between ~13 and 11.6 ka were associated with the cold North Atlantic Younger Dryas event. Dry intervals may have been due to massive losses of ice from the Laurentide Ice Sheet during Heinrich events, which caused the polar jet stream to shift north of the two surface-water systems. The entrance of the First Americans into the northern Great Basin is dated to approximately 14.4 ka, a time when the climate was relatively dry. Evidence for human occupation of the Great Basin is lacking for the next 1100 years; i.e., the oldest western stemmed point site in the Great Basin dates to 13.3 ka. We suggest two hypotheses for this apparent cultural hiatus: (1) the climate had deteriorated to the point that people vacated the Great Basin, or (2) people moved to basin-bottom wetlands that persisted during the dry period; then the subsequent Younger Dryas wet interval erased the archaeological evidence deposited around low-elevation wetland sites.

  6. Judicial status of Supreme Court of Ukraine as a subject revision of administrative businesses in an ad-ministrative process

    OpenAIRE

    Кайдашев, Роман

    2016-01-01

    In this article the features of legal to status Supreme Court of Ukraine are investigated as a subject of revision of court decisions of administrative courts of Ukraine and decisions in matters about administrative crimes. The place of Supreme Court of Ukraine is exposed in the instance system of general courts, plenary powers of this court are certain at the revision of court decisions of administrative courts and decisions in business about an administrative crime.English abstractThe judic...

  7. CDS - Database Administrator's Guide

    Science.gov (United States)

    Day, J. P.

    This guide aims to instruct the CDS database administrator in: o The CDS file system. o The CDS index files. o The procedure for assimilating a new CDS tape into the database. It is assumed that the administrator has read SUN/79.

  8. Webmin administrator's cookbook

    CERN Document Server

    Karzynski, Michal

    2014-01-01

    Written in a cookbook format with practical recipes this book helps you to perform various administrative tasks using Webmin and enables you to perform common jobs more efficiently.This book is perfect for System administrators who want to learn more advanced concepts of Webmin and how it can help to set up a server for development, testing or deployment.

  9. Understanding land administration systems

    DEFF Research Database (Denmark)

    P. Williamson, Ian; Enemark, Stig; Wallace, Judy;

    2008-01-01

    This paper introduces basic land administration theory and highlights four key concepts that are fundamental to understanding modern land administration systems. Readers may recall the first part of the paper in October issue of Coordinates. Here is the concluding part that focuses on the changing...... role of ownership and the role of land markets. Udgivelsesdato: November...

  10. Oral administration of taxanes

    NARCIS (Netherlands)

    Malingré, M.M.

    2002-01-01

    Oral treatment with cytotoxic agents is to be preferred as this administration route is convenient to patients, reduces administration costs and facilitates the use of more chronic treatment regimens. For the taxanes paclitaxel and docetaxel, however, low oral bioavailability has limited development

  11. Administration for Student Development.

    Science.gov (United States)

    Bergen, J. J., Ed.

    This collection of papers focuses on school administration and its relation to students. It is contended that toay's student matures earlier; has higher expectations; is more affluent; is more isolated from adults; is more critical and outspoken; and, therefore, must be heard by teachers and administrators. A related document is EA 001578.…

  12. The School Personnel Administrator.

    Science.gov (United States)

    Knox, Rodney F.

    This paper provides an overview of the development of the school-personnel administrator role. It first describes the influence of the science-management and human-relations movements and the behavioral sciences on personnel administration and human resource management. It next discusses the role of the personnel-performance-appraisal system and…

  13. Postmodern Public Administration

    DEFF Research Database (Denmark)

    Bogason, Peter

    2005-01-01

    Discussion of the trends towards more uses of postmodern analysis within the discipline of public administration, particularly in the USA......Discussion of the trends towards more uses of postmodern analysis within the discipline of public administration, particularly in the USA...

  14. Centos system administration essentials

    CERN Document Server

    Mallett, Andrew

    2014-01-01

    If you are a Linux administrator who is looking to gain knowledge that differentiates yourself from the crowd, then this is the book for you. Beginners who have a keen interest to learn more about Linux administration will also progress quickly with this resourceful learning guide.

  15. Guidelines and workbook for of organization and administration of utilities seeking operating license for a nuclear power plant. Workbook for assessment of organization and management. Volume, 2, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1986-09-01

    This report is a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and is designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorporated in the SRP.

  16. Guidelines and workbook for of organization and administration of utilities seeking operating license for a nuclear power plant. Workbook for assessment of organization and management. Volume, 2, Revision 1

    International Nuclear Information System (INIS)

    This report is a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and is designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorporated in the SRP

  17. Legal principles of regulatory administration and nuclear safety regulation

    International Nuclear Information System (INIS)

    This research presents a critical analysis and evaluation of principles of administrative laws in order to provide framework of structural reform on the nuclear safety regulation system. The focus of this analysis and evaluation is centered around the area of origin of regulatory administrative laws; authorities of regulation; procedures of regulatory actions; regulatory enforcement; and administrative relief system. In chapter 2 the concept of regulatory administration is analysed. Chapter 3 identifies the origin of regulatory administration and the principles of administration laws. It also examines legal nature of the nuclear safety standard. In relation to regulatory authorities. Chapter 4 identifies role and responsibility of administration authorities and institutions. It also examines fundamental principles of delegation of power. Then the chapter discusses the nuclear safety regulation authorities and their roles and responsibilities. Chapter 5 classifies and examines regulatory administration actions. Chapter 6 evaluates enforcement measure for effectiveness of regulation. Finally, chapter 7 discusses the administrative relief system for reviewing unreasonable regulatory acts

  18. PowerCube: Integrated Power, Propulsion, and Pointing for CubeSats Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Tethers Unlimited, Inc. proposes to develop the PowerCube, an integrated power, propulsion, and pointing solution for CubeSats. The PowerCube combines three...

  19. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  20. Reducing the cost of administrative justice

    International Nuclear Information System (INIS)

    In virtually every sector of government regulation, the complaint has been lodged that the costs of administrative justice are too high. These costs in time, money, resources, and productivity can have a profound effect on the individual consumer. When applied to an energy technology such as nuclear power, costs of administrative justice can transcent time and money to have even more profound and pervasive soeietal effects. Societal costs can be expressed in terms of their impact on important national concerns, that is, the standard of living, technological superiority, and the national energy equation. Some views are presented on the interests involved in the regulation of nuclear power and what can be done to bring those interests into better balance so as to reduce the cost of administrative justice

  1. Administration and Jurisdictional Policy

    Directory of Open Access Journals (Sweden)

    Eduardo Hernando Nieto

    2009-06-01

    Full Text Available To what extent does studying jurisdictional politics need the knowledge of different administrative theories in general and the science of public administration in particular? This small text proposes such reflection and comes to the conclusion that it is impossible to propose a new approximation to this topic without considering the administrative theory, for that the specialists and thinkers will get more with the contact of this discipline from what it is called a multidisciplinary approach.

  2. Publication of administrative circular

    CERN Multimedia

    HR Department

    2009-01-01

    ADMINISTRATIVE CIRCULAR NO. 23 (REV. 2) – SPECIAL WORKING HOURS Administrative Circular No. 23 (Rev. 2) entitled "Special working hours", approved following discussion in the Standing Concertation Committee on 9 December 2008, will be available on the intranet site of the Human Resources Department as from 19 December 2008: http://cern.ch/hr-docs/admincirc/admincirc.asp It cancels and replaces Administrative Circular No. 23 (Rev. 1) entitled "Stand-by duty" of April 1988. A "Frequently Asked Questions" information document on special working hours will also be available on this site. Paper copies of this circular will shortly be available in Departmental Secretariats. Human Resources Department Tel. 78003

  3. PUBLICATION OF ADMINISTRATIVE CIRCULAR

    CERN Multimedia

    HR Department

    2008-01-01

    ADMINISTRATIVE CIRCULAR NO. 23 (REV. 2) – SPECIAL WORKING HOURS Administrative Circular No. 23 (Rev. 2) entitled "Special working hours", approved following discussion in the Standing Concertation Committee meeting of 9 December 2008, will be available on the intranet site of the Human Resources Department as from 19 December 2008: http://cern.ch/hr-docs/admincirc/admincirc.asp It cancels and replaces Administrative Circular No. 23 (Rev. 1) entitled "Stand-by duty" of April 1988. A "Frequently Asked Questions" information document on special working hours will also be available on this site. Paper copies of this circular will shortly be available in departmental secretariats. Human Resources Department Tel. 78003

  4. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin, Volume XV; Appraisal of the Relationship between Tag Detection Efficiency at Bonneville Dam and the Precision of In-River Survival Estimates of Returning PIT-Tagged Chinook Salmon, 2000 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Comas, Joes A.; Skalski, John R. (University of Washington, School of Fisheries, Seattle, WA)

    2000-07-01

    In the advent of the installation of a PIT-tag interrogation system in the Cascades Island fish ladder at Bonneville Dam, this report provides guidance on the anticipated precision of in-river survival estimates for returning adult salmonids, between Bonneville and Lower Granite dams, for various levels of system-wide adult detection probability at Bonneville Dam. Precision was characterized by the standard error of the survival estimates and the coefficient of variation of the survival estimates. The anticipated precision of in-river survival estimates for returning adult salmonids was directly proportional to the number of PIT-tagged smolts released and to the system-wide adult detection efficiency at Bonneville Dam, as well as to the in-river juvenile survival above Lower Granite Dam. Moreover, for a given release size and system-wide adult detection efficiency at Bonneville Dam, higher estuarine and marine survival rates also produced more precise survival estimates. With a system-wide detection probability of P{sub BA} = 1 at Bonneville Dam, the anticipated CVs for in-river survival estimate ranged between 9.4 and 20% with release sizes of 10,000 smolts. Moreover, if the system-wide adult detection efficiency at Bonneville Dam is less than maximum (i.e., P{sub BA} < 1), precision of CV {le} 20% could still be attained. For example, for releases of 10,000 PIT-tagged fish a CV of 20% in the estimates of in-river survival for returning adult salmon could be reach with system-wide detection probabilities of 0.2 {le} P{sub BA} {le} 0.6, depending on the tagging scenario.

  5. Efficient, Long-Lived Radioisotope Power Generator Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Radiation Monitoring Devices, Inc., (RMD) proposes to develop an alternative very long term, radioisotope power source with thermoelectric power conversion with...

  6. Veterans Health Administration (VHA)

    Data.gov (United States)

    Social Security Administration — The purpose of this agreement is for SSA to verify SSNs and other identifying information for the Department of Veterans Affairs, VHA. DVA will use the information...

  7. Humanism, Administration and Education

    DEFF Research Database (Denmark)

    Plum, Maja

    2012-01-01

    Abstract Through the example of a Danish reform of educational plans in early childhood education, this paper analyses the emergence of a new pedagogical desire related to administrative educational reforms promoting accountability, visibility and documentation. Two arguments are made: first......, it is argued that the changes in administrative practices during the last decade constitute a transformation, but also a reproduction of relations between knowledge and governing that goes back to the big expansion of the welfare state. Second, it is argued that these relations between knowledge and governing...... are not restricted to the administrative practices, but are part of education and its humanistic legacy as well. As such, the administrative demand of documentation becomes possible and recognisable through its reproductive elements. Elements that are constituted in a transformative conjunction in which...

  8. Administrative & Operational Circulars - Reminder

    CERN Multimedia

    HR Department

    2011-01-01

    All Administrative and Operational Circulars are available on the intranet site of the Human Resources Department at the following address: http://cern.ch/hr-docs/admincirc/admincirc.asp Department Head Office  

  9. Understanding land administration systems

    DEFF Research Database (Denmark)

    P. Williamson, Ian; Enemark, Stig; Wallace, Judy;

    2008-01-01

    in contributing to sustainable development, thirdly the changing nature of ownership and the role of land markets, and lastly a land management vision that promotes land administration in support of sustainable development and spatial enablement of society. We present here the first part of the paper. The second...... part focuses on the changing  role of ownership and the role of land markets, and a land management vision will be published in November issue of Coordinates. Udgivelsesdato: Oktober......This paper introduces basic land administration theory and highlights four key concepts that are fundamental to understanding modern land administration systems - firstly the land management paradigm and its influence on the land administration framework, secondly the role that the cadastre plays...

  10. Social Security Administration

    Science.gov (United States)

    ... Languages Sign in / up The United States Social Security Administration Cost-Of-Living Adjustment (COLA) Information about ... replacement Medicare card Change of Address my Social Security Check out your Social Security Statement , change your ...

  11. Administrative Discretionary Grant Data

    Data.gov (United States)

    Institute of Museum and Library Services — This dataset of administrative records contains discretionary grant recipients who were awarded funds by the Institute of Museum and Library Services from fiscal...

  12. Spatially enabled land administration

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    enabling of land administration systems managing tenure, valuation, planning, and development will allow the information generated by these activities to be much more useful. Also, the services available to private and public sectors and to community organisations should commensurably improve. Knowledge....... In other words: Good governance and sustainable development is not attainable without sound land administration or - more broadly – sound land management. The paper presents a land management vision that incorporates the benefits of ICT enabled land administration functions. The idea is that spatial...... the communication between administrative systems and also establish more reliable data due to the use the original data instead of copies. In Denmark, such governmental guidelines for a service-oriented ITarchitecture in support of e-government are recently adopted. Finally, the paper presents the role of FIG...

  13. SELinux policy administration

    CERN Document Server

    Vermeulen, Sven

    2013-01-01

    A step-by-step guide to learn how to set up security on Linux servers by taking SELinux policies into your own hands.Linux administrators will enjoy the various SELinux features that this book covers and the approach used to guide the admin into understanding how SELinux works. The book assumes that you have basic knowledge in Linux administration, especially Linux permission and user management.

  14. Learning Cassandra for administrators

    CERN Document Server

    Parthasarathy, Vijay

    2013-01-01

    This book is a practical, hands-on guide, taking the reader from the basics of using Cassandra though to the installation and the running.Learning Cassandra for Administrators is for administrators who manage a large deployment of Cassandra clusters, and support engineers who would like to install the monitoring tools and who are also in charge of making sure the cluster stays the same, ensuring that the service is always up and running.

  15. Education of System Administration

    OpenAIRE

    Feyrer, Hubert

    2007-01-01

    This article discusses education of system administration. Theoretical foundations cover psychology, learning theory, instruction theory, and instructional design, leading to an ideal progression for education, and related tools. The main part describes an existing class on system administration as given at the University of Applied Sciences (Fachhochschule, FH) Regensburg, Germany. It is analyzed for its history and target audience, the current curriculum, course layout, and for the didac...

  16. Administration for Defence Scientists

    Directory of Open Access Journals (Sweden)

    G. E. Gale

    1953-01-01

    Full Text Available All scientific work must be carried out against a background of adequate administrative support if it is to become effective and produce useful results. Administration is not a job for which we, as scientists, are particularly trained; and it is a thing of which we tend to fight shy, partly because, author suppose, most Of peoples are associate the administrator with highly unpleasant matters such as income tax, delays in getting our pay cheques, and so on - For that reason we do not feel, always pay  sufficient attention to administrative affairs ; rather like the ostrich, we try to escape from them by merely ignoring them. But that is a wrong and unfruitful attitude to adopt. All live so much under the activities of the trained administrator that should, if, it  give a great deal of thought to our own administrative problems deliberate and conscious thought to them-and make an honest and heart-searching self analysis regarding our own possible failings.

  17. Wind power and defense interests on Gotland. Presentation of a joint project between the County Administrative Board, Region Gotland and the Swedish Armed Forces in 2011; Vindkraft och foersvarsintressen paa Gotland. Redovisning av ett samverkansprojekt mellan Laensstyrelsen, Region Gotland och Foersvarsmakten 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The island of Gotland has a large potential for wind power production. An existing weather radar system, however, causes extensive restrictions for further development of wind power on Gotland. In a joint project during 2011 the County Administration Board of Gotland, the Municipality of Gotland and the Swedish Armed Forces have explored ways to overcome the existing conflicts. The project has been sponsored by the Swedish Energy Agency. Through the collaboration, the participants have gained a better understanding of various aspects of the conflicting interests. Studies have been carried out with the prospect to modelling alternative solutions to reduce the conflicts. The study regarding the radar system has been carried out by the Swedish Meteorological and Hydrological Inst.. This report present some practical solutions to avoid conflict in most of areas which are planned for wind power by the municipality. It is suggested that a complimentary radar can be built. A number of alternative localizations for the complimentary radar have been suggested and the potential effects for wind power production estimated. Costs for the suggested solutions have been calculated.

  18. Windows PowerShell 20 Bible

    CERN Document Server

    Lee, Thomas; Schill, Mark E; Tanasovski, Tome

    2011-01-01

    Here's the complete guide to Windows PowerShell 2.0 for administrators and developers Windows PowerShell is Microsoft's next-generation scripting and automation language. This comprehensive volume provides the background that IT administrators and developers need in order to start using PowerShell automation in exciting new ways. It explains what PowerShell is, how to use the language, and specific ways to apply PowerShell in various technologies. Windows PowerShell is Microsoft's standard automation tool and something that every Windows administrator will eventually have to understand; this b

  19. 基于NASA地球观测数据库的区域风电功率波动特性分析%Study on the Profiling of China's Regional Wind Power Fluctuation Using GEOS-5 Data Assimilation System of National Aeronautics and Space Administration of America

    Institute of Scientific and Technical Information of China (English)

    于大洋; 韩学山; 梁军; 宋曙光

    2011-01-01

    In China, inadequate historical wind data hinders the profiling of wind power fluctuation at the regional level, which is the fundamental work for the wind power integration. This paper proposes a method to assess the seasonal and diurnal wind power patters based on the wind speed data from the National Aeronautics and Space Administration (NASA) Goddard Earth Observing System Model, Version 5 Data Assimilation System (GEOS-5 DAS). The Gipe formula is applied to get the vertical distribution of the wind speed. The wind speed is transformed into the electric power according to the power curve of Vestas V90-2.0MW turbine. A quantitative analysis is made for six wind power bases in China to present the difference of seasonal wind power patters and the regional correlations of hourly wind power patters. The method and results provide the basis for the regional wind power scheduling and dispatching.%针对大范围和长期风速观测网络不完善、风资源数据缺乏的问题,提出利用美国航天局(NASA)Goddard地球观测系统数据同化系统的版本5(GEO-5 DAS)的全球风速数据,对国内大范围风电功率波动进行评估的方法.根据GEOS-5 DAS的50 m高度风速和Gipe公式得到风速的垂直分布,按照Vestas V90-2.0 Mw风电机组的功率特性曲线将风速转化为风电功率,得到不同时间尺度下的容量因数曲线.对中国正在建设的6个千万千瓦级风电基地的季节性风电功率波动、小时功率波动及其季节性差异和地域相关性进行了定量分析.所提出的分析方法和结果为区域风电科学规划和优化调度提供了科学的依据.

  20. 77 FR 40609 - Robert D. Willis Power Rate

    Science.gov (United States)

    2012-07-10

    ... Southwestern Power Administration Robert D. Willis Power Rate AGENCY: Southwestern Power Administration, DOE... replacements to the hydroelectric generating facilities. The Administrator has developed a proposed Robert D... September 30, 2016.\\1\\ \\1\\ FERC on April 27, 2009 confirmed and approved the existing Robert D. Willis...

  1. Behavioral Public Administration: Combining Insights from Public Administration and Psychology

    OpenAIRE

    Grimmelikhuijsen, Stephan; Jilke, Sebastian; Olsen, Asmus Leth; Tummers, Lars

    2015-01-01

    We propose behavioral public administration as a designated subfield in public administration which explicitly deals with the integration of theories and methods from psychology into the study of public administration. We discuss how scholars in public administration currently draw on both methodological and theoretical innovations in psychology and point to research questions in public administration which could benefit from further integration. Behavioral public administration cannot, and s...

  2. Case law and administrative decisions

    International Nuclear Information System (INIS)

    About the case law we find four parts, one concerns France and the judgement of the council of state on an application for annulment of the decree of 10 january 2003 authorizing Cogema to modify a major nuclear installation, a second one is in relation with the Usa through the ruling in relation to the sale of uranium enrichment services in the united States, decision concerning the Yucca mountain repository, Indiana michigan power company v. United States, natural resources defense council, snake river alliance, confederated tribes and bands of the Yakama indian Nation, Shoshone Bannock Tribes v. Abraham. For the third part devoted to European union it is question of the judgement of the European Court of justice in European union v. UK, the fourth part concerns administrative decisions with the early shutdown of Barsebaeck-2 in Sweden. (N.C.)

  3. Pro Python System Administration

    CERN Document Server

    Sileika, R

    2010-01-01

    As time goes on, system administrators are presented with increasingly complicated challenges. In the early days, a team of engineers might have had to look after one or two systems. These days, one engineer can administer hundreds or thousands of systems. System administrators are gradually replacing their tools with more advanced and flexible ones. One of the choices is Python. Structurally, Python is a modern, high-level language with a very clean syntax. Python comes with many built-in libraries that can make automation tasks easier. It also has extensive set of third-party libraries and a

  4. Practical JIRA Administration

    CERN Document Server

    Doar, Matthew

    2011-01-01

    If you're familiar with JIRA for issue tracking, bug tracking, and other uses, you know it can sometimes be tricky to set up and manage. In this concise book, software toolsmith Matt Doar clarifies some of the more confusing aspects by answering difficult and frequently asked questions about JIRA administration. Practical JIRA Administration shows you how JIRA is intended to be used, making it an ideal supplement to the extensive documentation already available. The book's chapters are loosely connected, so you can go straight to the information that best serves your needs. Understand the di

  5. Computer hardware fault administration

    Science.gov (United States)

    Archer, Charles J.; Megerian, Mark G.; Ratterman, Joseph D.; Smith, Brian E.

    2010-09-14

    Computer hardware fault administration carried out in a parallel computer, where the parallel computer includes a plurality of compute nodes. The compute nodes are coupled for data communications by at least two independent data communications networks, where each data communications network includes data communications links connected to the compute nodes. Typical embodiments carry out hardware fault administration by identifying a location of a defective link in the first data communications network of the parallel computer and routing communications data around the defective link through the second data communications network of the parallel computer.

  6. Linux System Administration

    CERN Document Server

    Adelstein, Tom

    2007-01-01

    If you're an experienced system administrator looking to acquire Linux skills, or a seasoned Linux user facing a new challenge, Linux System Administration offers practical knowledge for managing a complete range of Linux systems and servers. The book summarizes the steps you need to build everything from standalone SOHO hubs, web servers, and LAN servers to load-balanced clusters and servers consolidated through virtualization. Along the way, you'll learn about all of the tools you need to set up and maintain these working environments. Linux is now a standard corporate platform with user

  7. Pro SharePoint 2013 administration

    CERN Document Server

    Garrett, Robert

    2013-01-01

    Pro SharePoint 2013 Administration is a practical guide to SharePoint 2013 for intermediate to advanced SharePoint administrators and power users, covering the out-of-the-box feature set and capabilities of Microsoft's collaboration and business productivity platform. SharePoint 2013 is an incredibly complex product, with many moving parts, new features, best practices, and 'gotchas.' Author Rob Garrett distills SharePoint's portfolio of features, capabilities, and utilities into an in-depth professional guide-with no fluff and copious advice-that is designed from scratch to be the manual Micr

  8. Administration for Children and Families

    Science.gov (United States)

    ... Releases RSS Feeds Speeches Videos What is the Administration for Children & Families? The Administration for Children and Families (ACF) is a division ... more about the 100-day challenge Visit the Administration on Children, Youth and Families Website The Family ...

  9. 49 CFR 1503.607 - Administrative law judges.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Administrative law judges. 1503.607 Section 1503... PROCEDURES Rules of Practice in TSA Civil Penalty Actions § 1503.607 Administrative law judges. (a) Powers of...) Administer oaths and affirmations. (4) Issue subpoenas authorized by law. (5) Rule on offers of proof....

  10. Harnessing water power in the larger Hannover area. Study commissioned by the local administration union larger Hannover area; Nutzung der Wasserkraft im Grossraum Hannover. Eine Studie im Auftrag des Zweckverbandes Grossraum Hannover

    Energy Technology Data Exchange (ETDEWEB)

    Sahling, U. [comp.

    1992-12-31

    Within the framework of an inventory of possible sites for hydroelectric power plants in the larger Hannover area, 60 sites in the rural district of Hannover were more closely investigated. 57 of these were former water mills and 3 were hydraulic structures that have nothing to do with former water mills. 29 water mills are to be considered as dismantled in hydraulic engineering terms, 8 are in operation, and 20 are decommissioned. Furthermore, 2 weirs and 1 barrage were included in the investigation.- In the area of the city of Hannover, there are four more sites of hydroelectric power plants, of which one is dismantled, two are decommissioned and one is in operation.- In order to complement the inventory, object expertises of different depths were prepared for eight selected sites. They permit a qualified assessment of the chances of reactivation of each site, taking the respective specific conditions into account. At the same time, they represent a first step towards detailed advice for a prospective operator (orig.). [Deutsch] Im Rahmen der Studie zur Bestandserhebung von moeglichen Standorten fuer Wasserkraftanlagen im Grossraum Hannover wurden 60 Standorte im Landkreis Hannover naeher untersucht. Es handelt sich um 57 ehemalige Wassermuehlen und 3 wasserbauliche Anlagen, die nichts mit ehemaligen Wassermuehlen zu tun haben. 29 Wassermuehlen sind im wasserbaulichen Sinn als beseitigt anzusehen, 8 sind in Betrieb, 20 liegen still. Darueberhinaus wurden 2 Wehre und 1 Stauanlage in die Untersuchungen einbezogen. Im Gebiet der Stadt Hannover befinden sich 4 weitere Wassrkraftstandorte, von denen einer als beseitigt anzusehen ist, zwei stilliegen und einer in Betrieb ist. Ergaenzend zu der Bestandserhebung wurden fuer acht ausgewaehlte Standorte Objektgutachten unterschiedlicher Bearbeitungstiefe erstellt. Sie ermoeglichen eine qualifizierte Beurteilung der Reaktivierungschancen unter Beruecksichtigung der jeweiligen standortspezifischen Besonderheiten

  11. Refinement for administrative policies

    NARCIS (Netherlands)

    Dekker, M.A.C.; Etalle, S.

    2007-01-01

    Flexibility of management is an important requisite for access control systems as it allows users to adapt the access control system in accordance with practical requirements. This paper builds on earlier work where we defined administrative policies for a general class of RBAC models. We present a

  12. Refinement for Administrative Policies

    NARCIS (Netherlands)

    Dekker, M.A.C.; Etalle, S.

    2007-01-01

    Flexibility of management is an important requisite for access control systems as it allows users to adapt the access control system in accordance with practical requirements. This paper builds on earlier work where we defined administrative policies for a general class of RBAC models. We present a

  13. United States Fire Administration

    Science.gov (United States)

    ... Reduction: Getting the Most From the U.S. Fire Administration’s Daily National Operations Brief PDF 127 KB There ... staff. Follow us: Twitter Facebook YouTube U.S. Fire Administration 16825 S. Seton Ave. , Emmitsburg , MD 21727 USA 800‑ ...

  14. Educational Administration's Weber.

    Science.gov (United States)

    Gronn, Peter

    1994-01-01

    Discusses Max Weber's importance in Greenfield's work, particularly in Greenfield and Ribbins'"Greenfield on Educational Administration" (1993). In concentrating on human actors' subjective understanding, Greenfield was a faithful Weberian. However, he deviated from Weber by disavowing structural explanations of social and organizational…

  15. Urban School Administration.

    Science.gov (United States)

    McKelvey, Troy V., Ed.; Swanson, Austin D., Ed.

    This document contains 12 papers presented at an institute for urban school administrators designed to deal with the contemporary urban educational problems incident to school desegregation, social integration, and the equality of educational opportunity. The authors of the papers relate recent research findings to practical field experience, and…

  16. IVA: Improving Vocational Administration.

    Science.gov (United States)

    EPD Consortium D, Richardson, TX.

    These six instructional units are intended to provide instructors of vocational education administration with a systematic package of materials for their programs of preservice and/or inservice instruction and to provide materials which could be reproduced for learner use. These units cover the following subject matter: (1) federal legislation…

  17. Administrators Confront Student "Sexting"

    Science.gov (United States)

    Manzo, Kathleen Kennedy

    2009-01-01

    Cellphone-savvy students have created instructional and disciplinary challenges for educators for years. But the recent emergence of "sexting" by adolescents over their mobile phones caught many school administrators off guard, and the practice is prompting efforts around the country to craft policy responses. Students' sharing of nude or…

  18. A Treatise on Administration.

    Science.gov (United States)

    Moore, Thomas R.

    1988-01-01

    Expands Henri Fayol's definition of the administrative process to include a humanistic approach involving planning, organizing, implementing, controlling, evaluating, and satisfying functions. This empirical definition differs from some theoretical approaches by looking beyond resource consumption to consider ecological effects on the environment…

  19. Enterprise Mac administrators guide

    CERN Document Server

    Smith, William

    2015-01-01

    IT departments everywhere will be integrating Macs and Mac OS X into their IT infrastructure and this book will tell them how to do it. It will serve as an authoritative, useful and frequently referenced book on Mac OS X administration.

  20. Dual Mode Low Power Hall Thruster Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Sample and return missions desire and missions like Saturn Observer require a low power Hall thruster that can operate at high thrust to power as well as high...

  1. Probabilistic Fault Diagnosis in Electrical Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical power systems play a critical role in spacecraft and aircraft. This paper discusses our development of a diagnostic capability for an electrical power...

  2. AES Modular Power Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The goals of this project are to 1) develop modular power design concepts for human exploration flight vehicles (longer-term) and assess, develop, and/or...

  3. The Geopolitics of "Youth Power'

    Science.gov (United States)

    Schofer, Jerry P.

    1973-01-01

    Describes a method for estimating the possible dimensions of youth power in each community to assist in determining administrative responses to an enfranchised, and politically active, student body. (Author)

  4. High Power Betavoltaic Technology Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation will dramatically improve the performance of tritium-powered betavoltaic batteries through the development of a high-aspect ratio, expanded...

  5. Electricity: Public power, TVA, BPA, and competition. Hearing before the Subcommittee on Energy and Power of the Committee on Commerce, House of Representatives, One Hundred Fifth Congress, First session

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This is the 17th hearing of the Subcommittee on Energy and Power as it looks toward a competitive electricity market. This hearing looks at the role of public power in this mix. Public power and cooperatives supply approximately 25% of the American consumers. Bonneville Power Authority and the Tennessee Valley Authority are the largest two public power systems, and they present unique problems as one looks at the question of competition in the electric market. They both have large debt services which need to be dealt with, preferably without transferrance to the country as a whole. The committee hears testimony from 15 witnesses in this hearing, to gain a perspective on the question of public power and competition.

  6. Influencing Factors in China's Macro Tax Burden: A Perspective from Interference of Administration Power in Tax Collection and Management%从行政力量对税收征管的介入看中国宏观税负的影响因素

    Institute of Scientific and Technical Information of China (English)

    李文

    2012-01-01

    There is a variety of factors leading to the rising of tax burden in China. One of these is the interference of administration power in tax collection and management. The macro tax burden is influenced by the administration power intervening both the set objective and the management process of the tax collection. The direct reason of this special influence is for lack of necessary information on tax sources, absence of any effective evaluation mechanism on tax collection and management or legal regulation in a certain field, or soft budget constraint or imperfect tax system. The deep reason is for the low-transparent public finance or the ill-defined rules between the central government and local governments. For some reasons, the interference of administration power cannot be eliminated in a short time.%中国宏观税负水平的上升是由多种因素引起的,行政力量对税收征管的介入是其中的一个重要因素。行政力量通过介入税收征收目标制定和税收征收管理过程而影响宏观税负,这种特殊影响的直接成因是缺乏必要的税源信息、缺乏有效的税收征管评价机制、部分领域法律调节缺失、预算软约束、税收制度不完善;深层次成因是财政透明度较低.中央与地方政府问的规则不够规范。由于部一分成因在短期内很难改变。行政力量对税收征管的介入仍将在一段较长的时期内继续对宏观税负构成影响。

  7. History on foundation of Korea nuclear power

    International Nuclear Information System (INIS)

    This reports the history on foundation of Korea nuclear power from 1955 to 1980, which is divided ten chapters. The contents of this book are domestic and foreign affairs before foundation of nuclear power center, establishment of nuclear power and research center, early activity and internal conflict about nuclear power center, study for nuclear power business and commercialization of the studying ordeal over nuclear power administration and new phase, dispute for jurisdiction on nuclear power business and the process, permission for nuclear reactor, regulation and local administration, the process of deliberation and decision of reactor 3. 4 in Yonggwang, introduction of nuclear reprocessing facilities and activities for social organization.

  8. Behavioral Public Administration: Combining Insights from Public Administration and Psychology

    DEFF Research Database (Denmark)

    Grimmelikhuijsen, Stephan; Jilke, Sebastian; Olsen, Asmus Leth;

    2015-01-01

    We propose behavioral public administration as a designated subfield in public administration which explicitly deals with the integration of theories and methods from psychology into the study of public administration. We discuss how scholars in public administration currently draw on both...... methodological and theoretical innovations in psychology and point to research questions in public administration which could benefit from further integration. Behavioral public administration cannot, and should not, replace ‘conventional’ public administration, but it is complementary to it. Importantly......, behavioral public administration represents a two-way street in which public administration scholars use theories and methods from psychology, and psychologists, in turn, learn from our setting of political-administrative contexts to refine their theories and methods. Finally, we propose four principals...

  9. Waterloo or Milestone of the Bush Administration

    Institute of Scientific and Technical Information of China (English)

    YangHongxi; ChenKaiming; WangWei

    2005-01-01

    In the coming four years, the Middle East will continue to be the strategic focus of the United States. It can be seen in an analysis of the recent years's ituation that the Bush administration rather chose a war in the Middle East to achieve its strategic goals than used non-military measures to do the same thing. In the future the Bush administration might find it difficult to draw back from its policy on the Middle East, which will mean more losses than gains. This will probably continue to cause damage to both the soft and hard power of the U.S., and result in a downward trend of the U.S. power for a certain period of time.

  10. Land Administration Systems

    DEFF Research Database (Denmark)

    Enemark, Stig

    2014-01-01

    Land administration systems are the operational tool for conceptualizing rights, restrictions and responsibilities (RRRs) in land. Each of the rights, restrictions and responsibilities encompasses a human rights dimension that relates to the overall national land policies and should be unfolded as...... more than just rhetoric. This paper attempts to analyse the aspects of human rights in relation to land administration systems with a special focus on developing countries struggling to build adequate systems for governing the rights, restrictions and responsibilities in land. Human rights are the...... of being alive. Of special interest in relation to land and property is the right to own things and the right of food and adequate housing for all. More generally, human rights should be seen as an ethical responsibility of government to ensure that people enjoy some basic rights as human beings...

  11. Law Tackling Administrative Monopolies

    Institute of Scientific and Technical Information of China (English)

    WAN LIXIN

    2006-01-01

    @@ The long-anticipated anti-monopoly law needs to better address the crucial distinction between administrative and economic monopolies The first five months of 2oo6 saw a surge in the profits achieved by key State enterprises, especially in the eight sectors including petroleum, telecommunication and electricity, which achieved 285 billion yuan (US$36 billion) in profits, accounting for about 86 percent of the total, according to a July report. From the Stateowned Assets Supervision and Administration Commission of the State (SASAC). This news was both heartening and disquieting, for the most profitable sectors happen to be monopolistic enterprises, mostly upstream the production chain, who achieve their profitability at the expense of those companies further downstream. For years these sectors have been at the centre of the "bust-the-trust" storm.

  12. ATLAS TDAQ System Administration:

    CERN Document Server

    Lee, Christopher Jon; The ATLAS collaboration; Bogdanchikov, Alexander; Ballestrero, Sergio; Contescu, Alexandru Cristian; Dubrov, Sergei; Fazio, Daniel; Korol, Aleksandr; Scannicchio, Diana; Twomey, Matthew Shaun; Voronkov, Artem

    2015-01-01

    The ATLAS Trigger and Data Acquisition (TDAQ) system is responsible for the online processing of live data, streaming from the ATLAS experiment at the Large Hadron Collider (LHC) at CERN. The online farm is composed of ̃3000 servers, processing the data readout from ̃100 million detector channels through multiple trigger levels. During the two years of the first Long Shutdown (LS1) there has been a tremendous amount of work done by the ATLAS TDAQ System Administrators, implementing numerous new software applications, upgrading the OS and the hardware, changing some design philosophies and exploiting the High Level Trigger farm with different purposes. During the data taking only critical security updates are applied and broken hardware is replaced to ensure a stable operational environment. The LS1 provided an excellent opportunity to look into new technologies and applications that would help to improve and streamline the daily tasks of not only the System Administrators, but also of the scientists who wil...

  13. Moodle administration essentials

    CERN Document Server

    Henrick, Gavin

    2015-01-01

    If you are an experienced system administrator and know how to manage servers and set up web environments but now want to explore Moodle, this book is perfect for you. You'll get to grips with the basics and learn to manage Moodle quickly, focusing on essential tasks. Having prior knowledge of virtual learning environments would be beneficial, but is not mandatory to make the most of this book.

  14. Flexible Land Administration

    DEFF Research Database (Denmark)

    Enemark, Stig

    2014-01-01

    Security of tenure is widely considered to be the missing piece of the puzzle when it comes to eradication of poverty. And, as explained in the previous issue of Geoinformatics, the European Union is now placing land rights at the heart of EU development policy. This article presents a way forwar...... in terms of building flexible and "fit-for-purpose" land administration systems in developing countries. This will ensure security of tenure for all and sustainable management of the use of land....

  15. IPv6 Network Administration

    CERN Document Server

    Murphy, Niall Richard

    2009-01-01

    This essential guide explains what works, what doesn't, and most of all, what's practical about IPv6--the next-generation Internet standard. A must-have for network administrators everywhere looking to fix their network's scalability and management problems. Also covers other IPv6 benefits, such as routing, integrated auto-configuration, quality-of-services (QoS), enhanced mobility, and end-to-end security.

  16. A economia política dos governos FHC, Lula e Dilma: dominância financeira, bloco no poder e desenvolvimento econômico Economic policy during the Cardoso, Lula, and Rousseff administrations: financial dominance, power blocs and economic development

    Directory of Open Access Journals (Sweden)

    Rodrigo Alves Teixeira

    2012-12-01

    Full Text Available O presente texto analisa a relação da política macroeconômica e o desenvolvimento econômico com seus condicionantes políticos, desde 1995 até os dias atuais (governos FHC, Lula e Dilma, por meio da abordagem da economia política, aplicando os conceitos de dominância financeira, dependência e bloco no poder. Ao adotar tal método, partiu-se do pressuposto de que a adoção de determinada política econômica é decorrência: i dos condicionantes externos, atrelados, no caso brasileiro, à sua condição periférica; ii dos condicionantes internos associados à interação e conflitos de interesses econômicos e políticos das frações de classe no bloco no poder e em seus desenlaces no Estado. O texto conclui que as mudanças recentes no bloco no poder, entre o final do governo Lula e início do governo Dilma, conferiram maior autonomia ao Estado, especialmente diante da fração bancário-financeira, até então hegemônica, o que abre espaço para a retomada das políticas de desenvolvimento.This paper analyzes the relationship between macroeconomic policy and economic development and the political constraints of that relationship from 1995 until present day ( Cardoso, Lula and Dilma Rousseff. This analysis relies on the political economy approach, applying the concepts of financial domination, dependence and power blocs. By virute of this method, we assume that the adoption of certain economic policy is the result of: i the external constraints (which, in Brazil, are coupled with the country's status as a peripheral and dependent economy and ii the constraints associated with the internal interaction and conflicts of economic and political interests of class fractions in the power bloc and its influence on the State. The paper concludes that recent changes to the power bloc between the end of the Lula administration and the beginning of the Rousseff administration gave the government greater autonomy, particularly in relation to the

  17. Genesis of tax administration

    OpenAIRE

    Myskin, Y. I.

    2014-01-01

    The history of formation and development of tax administration is studied. The stages of genesis of tax administration are identified and described. The historically caused major trends in tax administration which are based on knowledge of the nature of causality are formulated. Досліджено історію становлення та розвитку управління оподаткуванням. Визначено та охарактеризовано етапи генезису управління оподаткуванням. На основі пізнання природи причинно-наслідкових зв’язків сфо...

  18. Transition report, United States Department of Energy: A report to the President-Elect. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy transition issues. The topics of the report include: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Defense Programs; New Production Reactors; Economic Regulatory Administration; Energy Information Administration; energy research; environment, safety and health; fossil energy; General Counsel; hearings and appeals, Inspector General, international affairs and energy emergencies; management and administration, minority economic impact; nuclear energy; policy, planning and analysis, radioactive waste management; and power marketing administrations: Bonneville Power Administration, Western Area Power Administration, Alaska Power Administration, Southeastern Power Administration, and Southwestern Power Administration.

  19. Highlights of Electric Power Industry in China

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    @@Reform and Development of Electric Power Management Before 1978, China's electric power industry,managed by the Central Government, was a vertically monopoly sector. Along with China's reformation of economy structure started in 1978, electric power industry has step on its road of restructuring and deregulation. Up to now administration of China's electric power industry underwent following reciprocative changes:

  20. The Administration of Tax Systems

    OpenAIRE

    John Hasseldine

    2010-01-01

    This chapter analyses recent developments in tax administration and best practice. The chapter begins by contextualizing tax administration through a discussion on the necessary separation between the operational tasks performed in tax administration and the more generic, but nevertheless crucial, issues of organization, strategy and internal management required in tax administration. The chapter then describes the recent genesis and the current context of tax administration - especially in E...

  1. Electrochemical Power Plant for Terrestrial Flight Platforms Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An electrochemical power plant is proposed by MicroCell Technologies to provide power to terrestrial flight platforms. Our power plant is based upon a proton...

  2. UML IN BUSINESS ADMINISTRATION

    OpenAIRE

    Daniel Ionita

    2010-01-01

    The article elaborates weather UML, primarily used in software engineering, can be a useful tool in business modeling and administration. By analyzing the advantages the modeling language has to offer we find that UML is visual and object oriented and that it is useful in expressing structure, interaction and behavior as well. With its help managers and business people can build models and diagrams to help put things into perspective. “Case Study 1” shows UML can be used as an analysis tool i...

  3. An Analysis of Administrative Corruption (Administrative Organizations of Yazd City

    Directory of Open Access Journals (Sweden)

    Mansour Haghighatian

    2013-02-01

    Full Text Available Introduction   Administrative corruption is a complicated and multi-faceted phenomenon that has many causes and ramifications, which manifest themselves in different forms in various countries and appear to be endemic of all social systems where authority is delegated. Although there might be different definitions of and approaches towards administrative corruption, the definition that has been put forward by the World Bank and Transparency International appears to be more general and comprehensive. It defines corruption as the abuse of public power, office, or resources by public or elected governmental officials for personal gain, e.g. by extortion, soliciting or offering bribes. Recent research findings indicate that organizational commitment and work satisfaction on the part of employees could be an effective antidote to administrative corruption. On the other hand, employee sense of equity and fairness also has been shown to be effective in enhancing organizational commitment. Last but not least, employee financial needs could play a significant part in their vulnerability to corruption. Therefore, the main aim of this paper is as follows: by utilizing the ideas of Selznick on organizational commitment, Merton's views on work satisfaction, Taylor's and Schwartz's ideas on financial needs, and Barnard's views on managerial capabilities, the relationships of these variables on administrative corruption were studied. The other purpose of the paper is to examine the effects of some other related variables like age, sex, level of education, job seniority, and marital status on administrative corruption.     Material and Methods   The research method was quantitative, data collection technique was survey, and the tool of data collection was questionnaire. The research population of the study consisted of all 44116 employees of public organizations of the city of Yazd. Using a stratified sampling technique, 16 administrative organizations

  4. New Sensing Application to Diagnose Power Semiconductor Aging in Actuator Power Drive Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — This paper presents a new sensing application to diagnose power semiconductor aging in power drive systems. It has been shown previously that device parasitic...

  5. Solid-State Thermionic Nuclear Power for Megawatt Propulsion, Planetary Surface and Commercial Power Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Thermionic (TI) power conversion is a promising technology first investigated for power conversion in the 1960’s, and of renewed interest due to modern...

  6. Silicon-Carbide (SIC) Multichip Power Modules (MCPMS) For Power Building Block Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase I project seeks to prove the feasibility of developing high power density modular power electronic building blocks...

  7. Unique Power Dense, Configurable, Robust, High-Voltage Power Supplies Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Princeton Power will develop and deliver three small, lightweight 50 W high-voltage power supplies that have a configurable output voltage range from 500 to 50...

  8. PowerCube: Integrated Power, Propulsion, and Pointing for CubeSats Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The PowerCube is a 1U CubeSat module that provides integrated propulsion, power, and precision pointing to enable the low-cost CubeSat platform to be used to...

  9. Cost-effectiveness of conservation upgrades in manufactured homes

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conner, C.C.; Englin, J.E.; Hadley, D.L.; Lucas, R.G.; Miller, N.E.; Monroe, W.H.

    1988-09-01

    This study addresses the costs of upgrading the efficiency of electrically heated manufactured homes in the Bonneville Power Administration's (Bonneville's) service territory. It was prepared by the Battelle Pacific Northwest Laboratory (PNL) for Bonneville under a Related Services Agreement with the US Department of Energy, Contract AC06-76RLO1830. Manufactured homes (commonly called mobile homes) represent a significant lost conservation resource in the region. Manufactured homes are required to meet national energy standards that do not reflect the recent increases in energy prices, and the preemptive nature of the national standards prevents local jurisdictions from establishing stricter requirements. Bonneville has undertaken several programs to analyze the efficiency of manufactured homes and encourage the industry to produce more efficient homes and consumers to increase their demand for efficient units. This study constitutes one portion of Bonneville's overall strategy. 45 refs.

  10. Administration of Educational Services: A Glossary of Basic Administration Terminology.

    Science.gov (United States)

    Wheelbarger, J. J.

    From "achievement motivation" and "administration" to "Theory Z" and "viscidity and hedonic tone," this glossary defines 87 terms as they are used in educational administration. The terms include philosophical, psychological, organizational, and social concepts, but they all are employed in the theory and practice of administration. A short…

  11. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin, Volume XIV; Appraisal of the Relationship between Tag Detection Efficiency at Bonneville Dam and the Precision in Estuarine and Marine Survival Estimates on Returning PIT Tagged Chinook Salmon, 2000 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Comas, Jose A.; Skalski, John R. (University of Washington, School of Fisheries, Seattle, WA)

    2000-07-01

    In the advent of the installation of a PIT-tag interrogation system in the Cascades Island fish ladder at Bonneville Dam, this report provides guidance on the anticipated precision of salmonid estuarine and marine survival estimates, for various levels of system-wide adult detection probability at Bonneville Dam. Precision was characterized by the standard error of the survival estimates and the coefficient of variation of the survival estimates. The anticipated precision of salmonid estuarine and marine survival estimates was directly proportional to the number of PIT-tagged smolts released and to the system-wide adult detection efficiency at Bonneville Dam, as well as to the in-river juvenile survival above Lower Granite Dam. Moreover, for a given release size and system-wide adult detection efficiency, higher estuarine and marine survivals did also produce more precise survival estimates. With a system-wide detection probability of P{sub BA} = 1 at Bonneville Dam, the anticipated CVs for the estuarine and marine survival ranged between 41 and 88% with release sizes of 10,000 smolts. Only with the 55,000 smolts being released from sites close to Lower Granite Dam and under high estuarine and marine survival, could CVs of 20% be attained with system detection efficiencies of less than perfect detection (i.e., P{sub BA} < 1).

  12. The Europeanization of Public Administration through the General Principles of Good Administration

    Directory of Open Access Journals (Sweden)

    Vasilica NEGRUŢ

    2011-08-01

    Full Text Available The general objective of the paper is based on an extremely present theme of real interest. Using the content analysis, through a descriptive documentary research, the present study aims at identifying the dimensions of the general principles of good administration, in the context of changes at European an implicitly at national level. To this purpose, an analisys of the specific objectives will be made: the concept of good administration, the national dimensions of the right to be heard, the right to access personal files as well as the motivation of administrative acts and the general principles regulated by the European Code of Good Administration will be underlined, in the context of institutional change determined by the Lisbon Treaty. Good administration defines the way in which institutions function, this being possible by ensuring the right to access information, a more efficient protection of fundamental rights as well as the right to defense, publication of acts and their motivation. Good administration is strongly connected to good government, the relation being in our opinion, from part to whole. The final purpose of good government and implicitly of good administration aims at accomplishing the general interest. The two concepts need a higher degree of transparency and responsibility in the public process. If governing represents the modality of exerting power, good government entails the imperative of the consensus of those governed regarding the objectives and methods of government, the responsibility of those governing, the efficiency of governing and the citizens’ right to be informed regarding the use and the distribution of the financial resources in the governing process. This new concept takes into account the implication of the citizens in the decision - making process, allowing a more efficient use of material, human, and financial resources. We assert thus that by applying the general principles of good administration

  13. Revenue Administrations and Corruption: Motivations, Opportunities and Fighting Methods

    Directory of Open Access Journals (Sweden)

    Serkan Benk

    2010-10-01

    Full Text Available Revenue administration is very important for a state’s economic development as it significantly affects its public expenditures capacity. But corruption in revenue administration can have a serious impact on fiscal sustainability by reducing the tax revenue of a government. Corruption in revenue administration also discourages honest taxpayers by making the black-market a more attractive alternative. Revenue administration is an attractive sector for corruption to take place as the opportunities and motivations to engage in illicit activity are numerous. The complexity of tax systems, the high discretionary powers of tax officials, the low cost of punishment, the pressure from tax evaders are only some factors creating environment for corruption in revenue administration. The aim of this study is to examine opportunities, motivations and fighting methods of corruption in revenue administrations.

  14. Supplement analysis, Southpoint power project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-16

    The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.

  15. Contact Center Manager Administration (CCMA)

    Data.gov (United States)

    Social Security Administration — CCMA is the server that provides a browser-based tool for contact center administrators and supervisors. It is used to manage and configure contact center resources...

  16. Administrative Law and Organization Theory

    Science.gov (United States)

    Evan, William M.

    1977-01-01

    Considered are some trends in American administrative law, some trends in organization theory, a model of the administrative process, and several potentially useful research strategies. The analysis has implications for comparative research on legal systems. (Author/LBH)

  17. Administrative Implications of Curriculum Reform

    Science.gov (United States)

    Abbott, Max G.; Eidell, Terry L.

    1970-01-01

    The director of the Center for the Advanced Study of Educational Administration at the University of Oregon and one of his associates discuss the new role of administration in an individual-oriented educational system. (AA)

  18. Functions Of Land Administration System

    OpenAIRE

    Oksana Sakal

    2012-01-01

    The theoretical basis and essence of some common and specific functions of land administration system as an integral mechanism of effective land use and land administration levels (case-study for forest and other land available for afforestation) are analysed.

  19. Administrative Dimensions of Tax Reform

    OpenAIRE

    Bird, Richard M.

    2003-01-01

    The best tax policy in the world is worth little if it cannot be implemented effectively. Tax policy design in developing countries must therefore take the administrative dimension of taxation carefully into account. What can be done may to a considerable extent determine what is done in any country. This paper discusses the relationship between tax policy and tax administration. When can policy lead administration? When must policy initiatives wait on administrative reform? How exactly can b...

  20. The interpretation of administrative contracts

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2014-06-01

    Full Text Available The article analyzes the principles of interpretation for administrative contracts, in French law and in Romanian law. In the article are highlighted derogations from the rules of contract interpretation in common law. Are examined the exceptions to the principle of good faith, the principle of common intention (willingness of the parties, the principle of good administration, the principle of extensive interpretation of the administrative contract. The article highlights the importance and role of the interpretation in administrative contracts.

  1. Administrators' Decisions about Resource Allocation

    Science.gov (United States)

    Knight, William E.; Folkins, John W.; Hakel, Milton D.; Kennell, Richard P.

    2011-01-01

    Do academic administrators make decisions about resource allocation differently depending on the discipline receiving the funding? Does an administrator's academic identity influence these decisions? This study explored those questions with a sample of 1,690 academic administrators at doctoral-research universities. Participants used fictional…

  2. What is BPA?

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-09-01

    This PR pamphlet explains what BPA (Bonneville Power Administration) is (a Federal agency with a Northwest focus). It plays a role in balancing river uses; power revenues pay BPA costs; renewable resource aspects are discussed; fish and wildlife protection are discussed; the BPA power grid is disucssed; and how BPA disposes of its power is discussed.

  3. The Concept of Appropriateness in Issuing Administrative Acts

    Directory of Open Access Journals (Sweden)

    Iulian Nedelcu

    2011-05-01

    Full Text Available Administrative acts are a legal way of organizing the execution and enforcement of the law. Law can not and should not establish all cases and all the ways, by means of which public administration bodies interfere with administrative actions, therefore administrative public bodies must have some initiative and ought to be able to assess the situations in which they will issue these acts and to appreciate their appropriateness. The appropriateness principle of administrative acts must be correlated with the legality principle. It can be concluded that the appropriateness principle underscores the power conferred by public administration, permitted in accordance with which it has the right and duty to judge when issuing an administrative compliance of the state of lawand facts, an appreciation that public administration is based on a single criterion: the interests of the community that they represent. Also, the very organization of the state as a state of law leads to the conclusion that the law – which is the materialization of the idea of justice – should be the standard on which the activity of human individuals report both to the quality of beneficiaries of the provisions and benefits of public administration and on the other hand as officials, public servants or ordinary employees in public administration system.

  4. 14 CFR 27.695 - Power boost and power-operated control system.

    Science.gov (United States)

    2010-01-01

    ... system. 27.695 Section 27.695 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated control system is used, an alternate system must be immediately available that allows continued...

  5. 14 CFR 29.695 - Power boost and power-operated control system.

    Science.gov (United States)

    2010-01-01

    ... system. 29.695 Section 29.695 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated control system is used, an alternate system must be immediately available that allows continued...

  6. 行政权力与社会权利:政府法治化的社会保障视角分析%Administrative Power and Social Rights:The Analysis of Social Security from the Perspective of Government Ruled by Law

    Institute of Scientific and Technical Information of China (English)

    朱艳敏

    2014-01-01

    作为一种特殊的资源配置机制,法律的存在不仅是社会关系的调节器,也是政府行政权力与公民社会权利之间的平衡杆。作为一种全新的管理形态,法治政府是实现行政权力规范运行的主要路径选择。与此同时,社会保障作为一种旨在保障公民生存权,实现社会公平的利益分配机制,也需要以法制化来维持制度的稳定性。对此,转变政府职能,加强社会保障立法,培育公民社会,有助于实现政府法治化与社会保障法制化之间互推式发展。%As a special allocated mechanism, the existence of law is not only the regulator of social relationship; but also the balance between the government's administrative power and citizen's social rights. As a new management pattern, the government ruled by law is the choice to make the operation of administrative authority standard. Meanwhile, Social security, as a protection to citizen's subsistence right and the interest distribution mechanism to social justice, also needs to be legalized to maintain the stability of the system. Therefore, the transformation of government functions, strengthening the legislation of social security and cultivating the civil society, can be beneficial to achieve the mutual development between the government ruled by law and social security ruled of law.

  7. 简政放权、放管结合下的监管问题研究--基于回应性监管理论的分析%Regulatory Issues of Streamline Administration and Decentralization and Delegating Power While Enforcing Government Regulations---Analysis Based on Theory of Responsive Regulation

    Institute of Scientific and Technical Information of China (English)

    陈自立

    2016-01-01

    With the new normal ofstreamline administration anddecentralization , the regulatory issues of del-egating power while enforcing government regulations become more important .The theory of responsive regu-lation of western countries provides reference methods for China ’ s regulatory problems .Facing the problems of the lack of supervision of the regulatory , single subject of supervision , regulatory methods backward and regulatory “revolving door”, China shouldabsorbcreatively core elements of the theory of responsive regula -tion ,construct a diversified regulatory system and participate in the diversification of the main responsibilities of the regulatory system , combined with the actual situation in China to ensure that the government would deepen the implementation of the administrative reform objectives .%随着简政放权步入新常态,放管结合中的监管问题变得越来越突出,西方国家的回应性监管理论为我国监管问题提供借鉴方法。面对我国监管领域出现的监管缺失、监管主体单一、监管方法落后和监管“旋转门”问题,我国应创造性地吸收回应性监管理论的核心要点,结合中国实际情况,构建监管手段多样化、参与主体多元化的权责分明的监管治理体系,保证政府深化行政改革目标的实现。

  8. Key Obama officials leave administration

    Science.gov (United States)

    Showstack, Randy

    2013-01-01

    Secretary of the Interior Ken Salazar is one of the latest members of the Obama administration to announce that he is leaving his position near the start of President Obama's second term in office. Salazar, who has served as interior secretary since January 2009, intends to leave the department by the end of March, the department noted on 16 January. Salazar joins a number of other key officials who are planning to leave the administration. They include Environmental Protection Agency administrator Lisa Jackson, National Oceanic and Atmospheric Administration administrator Jane Lubchenco, and U.S. Geological Survey director Marcia McNutt.

  9. 18 CFR 300.14 - Filings under section 7(k).

    Science.gov (United States)

    2010-04-01

    ...(k). 300.14 Section 300.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... section 7(k). Any application for Commission review and approval of a rate or rate schedules established by the Administrator of the Bonneville Power Administration pursuant to section 7(k) of the...

  10. Cultural Issues in Psychiatric Administration and Leadership.

    Science.gov (United States)

    Aggarwal, Neil Krishan

    2015-09-01

    This paper addresses cultural issues in psychiatric administration and leadership through two issues: (1) the changing culture of psychiatric practice based on new clinician performance metrics and (2) the culture of psychiatric administration and leadership in light of organizational cultural competence. Regarding the first issue, some observers have discussed the challenges of creating novel practice environments that balance business values of efficient performance with fiduciary values of treatment competence. This paper expands upon this discussion, demonstrating that some metrics from the Centers for Medicare & Medicaid Services, the nation's largest funder of postgraduate medical training, may penalize clinicians for patient medication behaviors that are unrelated to clinician performance. A focus on pharmacotherapy over psychotherapy in these metrics has unclear consequences for the future of psychiatric training. Regarding the second issue, studies of psychiatric administration and leadership reveal a disproportionate influence of older men in positions of power despite efforts to recruit women, minorities, and immigrants who increasingly constitute the psychiatric workforce. Organizational cultural competence initiatives can diversify institutional cultures so that psychiatric leaders better reflect the populations they serve. In both cases, psychiatric administrators and leaders play critical roles in ensuring that their organizations respond to social challenges.

  11. Southwestern Power Administration site environmental report for calendar year 1993

    International Nuclear Information System (INIS)

    During CY 93, Southwestern was not involved in any programs that had a direct effect on the environment, involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received an environmental management audit by the Department of Energy's Office of Environmental Audit (EH-24), during CY 1992. The purpose of the audit was to give Southwestern, DOE headquarters, and the Secretary an indication of the status of Southwestern management's effectiveness in discharging its duties in an environmentally responsible manner. The audit identified 17 findings. An action plan was developed and remediation of the findings has been accomplished. Several strengths were identified during the audit with regard to the environmental programs at Southwestern. Most importantly, senior management at Southwestern has taken actions to increase environmental awareness throughout the organization which is evidenced by the creation of the Environmental, Safety, Health, and Security Office

  12. Southwestern Power Administration site environmental report for calendar year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    During CY 93, Southwestern was not involved in any programs that had a direct effect on the environment, involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received an environmental management audit by the Department of Energy`s Office of Environmental Audit (EH-24), during CY 1992. The purpose of the audit was to give Southwestern, DOE headquarters, and the Secretary an indication of the status of Southwestern management`s effectiveness in discharging its duties in an environmentally responsible manner. The audit identified 17 findings. An action plan was developed and remediation of the findings has been accomplished. Several strengths were identified during the audit with regard to the environmental programs at Southwestern. Most importantly, senior management at Southwestern has taken actions to increase environmental awareness throughout the organization which is evidenced by the creation of the Environmental, Safety, Health, and Security Office.

  13. 77 FR 65546 - Western Area Power Administration; Notice of Filing

    Science.gov (United States)

    2012-10-29

    ... for the Western Rate Schedules database, to be effective July 14, 2011. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission...

  14. 29 CFR 417.6 - Powers of Administrative Law Judge.

    Science.gov (United States)

    2010-07-01

    ... Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS PROCEDURE FOR REMOVAL OF LOCAL LABOR ORGANIZATION OFFICERS Procedures To Determine... request for information or documentary evidence, or for contumacious conduct; (k) To grant continuances...

  15. Power Outages

    Science.gov (United States)

    ... Thunderstorms & Lightning Tornadoes Tsunamis Volcanoes Wildfires Main Content Power Outages This page provides basic safety tips and ... during and after a power outage. Before a Power Outage Build or restock your emergency preparedness kit , ...

  16. Congress examines administration's coal research priorities

    Science.gov (United States)

    Showstack, Randy

    2011-10-01

    While the Obama administration has proposed a shift in coal research funding to further emphasize carbon capture and sequestration (CCS) programs in its fiscal year (FY) 2012 budget request, Republicans and several witnesses at a 13 October hearing of a subcommittee of the House of Representatives' Committee on Science, Space, and Technology questioned those priorities, called for additional federal funding for coal research, and defended the use of coal as a major part of the U.S. energy sector. The administration's FY 2012 budget requests 291.4 million to fund the Department of Energy's (DOE) CCS and power systems program while zeroing out funding for DOE's fuels and power systems program (which includes funding for coal research) and shifting some of its line items to the CCS program. The FY 2011 continuing resolution has funded the fuels and power systems program at 400.2 million, including 142 million for carbon sequestration, 64.8 million for innovations for existing plants, and funding for other subprograms such as advanced integrated gasification combined cycle (52.9 million), fuel cells (49.8 million), and advanced research ($47.6 million).

  17. Pragmatic power

    CERN Document Server

    Eccles, William

    2008-01-01

    Pragmatic Power is focused on just three aspects of the AC electrical power system that supplies and moves the vast majority of electrical energy nearly everywhere in the world: three-phase power systems, transformers, and induction motors. The reader needs to have had an introduction to electrical circuits and AC power, although the text begins with a review of the basics of AC power. Balanced three-phase systems are studied by developing their single-phase equivalents. The study includes a look at how the cost of ""power"" is affected by reactive power and power factor. Transformers are cons

  18. UML IN BUSINESS ADMINISTRATION

    Directory of Open Access Journals (Sweden)

    Daniel Ionita

    2010-12-01

    Full Text Available The article elaborates weather UML, primarily used in software engineering, can be a useful tool in business modeling and administration. By analyzing the advantages the modeling language has to offer we find that UML is visual and object oriented and that it is useful in expressing structure, interaction and behavior as well. With its help managers and business people can build models and diagrams to help put things into perspective. “Case Study 1” shows UML can be used as an analysis tool in business modeling to help increase the complexity and depth of the event or project that is being developed. “Case Study 2” attempts to prove that UML can also be efficiently used in finding solutions to newly appeared problems in a business environment. Despite the practicality of the Unified Modeling Language there is still some criticism brought to it. Some programmers consider it to be hard to learn and some developers claim that it is too abstract. The article concludes that despite the minor drawbacks; due to its adaptability and complex visual models, it is a very useful tool that adds value to the modeling of business structures and processes.

  19. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  20. Pacific Lamprey Research and Restoration : Annual Report 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

    1998-08-05

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

  1. Automated Fault Diagnostics, Prognostics, and Recovery in Spacecraft Power Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Fault detection and isolation (FDI) in spacecraft's electrical power system (EPS) has always received special attention. However, the power systems health...

  2. Integrated Three-Port Converters for Compact and Efficient Power Management Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To meet the increasing power demand of today's spacecraft systems, an integrated power electronics system capable of interfacing, and simultaneously controlling,...

  3. Integrated Three-Port Converters for Compact and Efficient Power Management Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To meet the ever-increasing power demand of today's spacecraft systems, an integrated power electronics system capable of interfacing, and simultaneously...

  4. 49 CFR 234.251 - Standby power.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Standby power. 234.251 Section 234.251 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., Inspection, and Testing Inspections and Tests § 234.251 Standby power. Standby power shall be tested at...

  5. The changing power equation in hospitals.

    Science.gov (United States)

    Rayburn, J M; Rayburn, L G

    1997-01-01

    This research traces the origins, development, and reasons for change in the power equation in the U.S. hospitals between physicians, administrators and accountants. The paper contains three major sections: a review of the literature concerning authority, power, influence, and institutional theory; a review of the development of the power of professions, especially physicians, accounting and healthcare administrators, and the power equilibrium of a hospital; and, a discussion of the social policy implications of the power struggle. The basis for physicians' power derives from their legal ability to act on which others are dependent, such as choosing which hospital to admit patients, order tests and procedures for their patients. The Federal Government's prospective payment system and the hospitals' related case-mix accounting systems appear to influence the power structure in hospitals by redistributing that power. The basis of the accountants' power base is control of financial information. Accountants have a definite potential for influencing which departments receive financial resources and for what purpose. This moves hospital accountants into the power equation. The basis of the hospital administrators' power is their formal authority in the organization. Regardless of what actions federal government agencies, hospital accountants, or hospital administrators take, physicians are expected to remain the dominant factor in the power equation. Without major environmental changes to gain control of physician services, only insignificant results in cost containment will occur. PMID:10163913

  6. Administrative procedures linked with power production facilities that use renewable energy sources. Report made in application of article 6 of directive 2001/77/CE from October 27, 2001; Les procedures administratives liees aux installations de production d'electricite d'origine renouvelable. Rapport fait en application de l'article 6 de la directive 2001/77/CE du 27/10/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-10-01

    This report presents an evaluation of the legislative and regulatory framework relative to power generation facilities that use renewable energy sources. It presents also the actions that have been carried out to reduce the obstacles to the development of these facilities (access to the power distribution and transportation grid). (J.S.)

  7. Virtual Reality and Public Administration

    OpenAIRE

    Tózsa, István

    2013-01-01

    This study serves as an introduction to how virtual reality systems could be applied in public administration and what research tasks would be necessary to accomplish a project. E-government solutions began to emerge in public administration approximately a decade ago all over the developed world. Administration service facilities via the Internet did not attract many customers, because of the digital divide. E-government solutions were extended to mobile devices as well, but the expected bre...

  8. Power Networks

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    @@Present States and Characteristics Since implementing reform and open policy,power industry in China has implemented the policy of separating govemment functions from enterprises, taking provincial power sectors as independent entities,integrating power networks, unified power dispatching and raising fund from various sources”, which has brought about rapid growth of power industry. With 12 years of continuous annual growth over 10,000 MW since 1988, the national total installed capacity reached 319.320.9 MW with an annual generation of 1368.482 TWh in 2000. To cope with the rapid growth of power source. all power networks in China have expanded correspondingly.

  9. Signs of a crisis and ways of its overcoming in the system of government administration

    OpenAIRE

    SYTNIK L.S.; BERVENOVA T.N.

    2014-01-01

    The paper characterizes government administration as a way to implement the state power; signs, forms and methods, structure of the mechanism of government administration; factors of formation of the style of the government-administration activity. The authors distinguish essential signs of the crisis in the government administration, the sequence of stages of crises emergence and aggravation; types of conflicts on the territorial component, reasons for revolutions, principles of overcoming; ...

  10. Decision from the Commission of Electricity Regulation (CRE) dated from May 2, 2002 about a dispute between the manager of the power transportation network (RTE) and the autonomous administration of Parisian transports (RATP) relative to the conditions of consideration of the multiplicity of power supply points in the contractual system of access to the power grid; Decision de la Commission de Regulation de l'Electricite (CRE) en date du 2 mai 2002 sur un different qui oppose le gestionnaire du Reseau de Transport d'Electricite (RTE) et la Regie Autonome des Transports Parisiens (RATP) relatif aux conditions de prise en compte de la multiplicite des points de livraison dans le dispositif contractuel d'acces au reseau electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-01

    This document is the analysis made by the French commission of electricity regulation (CRE) about a dispute between the French manager of the power transportation grid (RTE) and the autonomous administration of Parisian transports (RATP) about its contract of access to the grid for the power supply of the underground railway of Paris. The RATP requested a regrouping of all its 7 supply points in a single contract. After analysis of the hearings, the CRE considers that no discrimination exists in the contractual system proposed by the RTE and thus the RATP request has been rejected. (J.S.)

  11. Electric power annual 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  12. Intercommunal cooperation for the purpose of satisfying local power demand

    International Nuclear Information System (INIS)

    The article deals with the following: communal competences in the area of the power economy; forms of communal activity in the area of power supply; specific forms of communal cooperation; the procedure of communal cooperation; legal personality and internal organization; the local administration union as an instrument of power supply; categorization of the local administration union with respect to the legal system; the communal administrative agreement. (HSCH)

  13. Tidal-Fluvial and Estuarine Processes in the Lower Columbia River: I. Along-channel Water Level Variations, Pacific Ocean to Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jay, D. A.; Leffler, K.; Diefenderfer, Heida L.; Borde, Amy B.

    2015-03-01

    This two-part paper provides comprehensive time and frequency domain analyses and models of along-channel water level variations in the 234km-long Lower Columbia River and Estuary (LCRE) and documents the response of floodplain wetlands thereto. In Part I, power spectra, continuous wavelet transforms, and harmonic analyses are used to understand the influences of tides, river flow, upwelling and downwelling, and hydropower operations ("power-peaking") on the water level regime. Estuarine water levels are influenced primarily by astronomical tides and coastal processes, and secondarily by river flow. The importance of coastal and tidal influences decreases in the landward direction, and water levels are increasingly controlled by river flow variations at periods from ≤1 day to years. Water level records are only slightly non-stationary near the ocean, but become increasingly irregular upriver. Although astronomically forced tidal constituents decrease above the estuary, tidal fortnightly and overtide variations increase for 80-200km landward, both relative to major tidal constituents and in absolute terms.

  14. Wind power in power systems

    CERN Document Server

    Ackermann, Thomas

    2012-01-01

    The second edition of the highly acclaimed Wind Power in Power Systems has been thoroughly revised and expanded to reflect the latest challenges associated with increasing wind power penetration levels. Since its first release, practical experiences with high wind power penetration levels have significantly increased. This book presents an overview of the lessons learned in integrating wind power into power systems and provides an outlook of the relevant issues and solutions to allow even higher wind power penetration levels. This includes the development of standard wind turbine sim

  15. Coaches Guide to Sport Administration.

    Science.gov (United States)

    Leith, Larry M.

    This guide for athletic coaches offers a practical approach to the administrative functions of organizing, planning, leading, and controlling. Included are chapters on coaching administration, fund raising, organizing competitions, and designing effective budgets and controls. The guide addresses the following topics: (1) the categories of…

  16. Postmodernism in Higher Educational Administration

    Science.gov (United States)

    Demaris, Michalyn C.; Kritsonis, William Allan

    2007-01-01

    Postmodernism has many inferences that can be applied to the theory and practice of higher educational administration. Today, in higher education administrators are continuously focused on strategies that will ensure the future of minority educational institutions. As a result postmodernism is an important factor in the future of higher…

  17. Administrative Approaches to Educational Productivity.

    Science.gov (United States)

    Koski, William S.; Levin, Henry M.

    1998-01-01

    Presents an institutional framework for raising higher education productivity through administrative and organizational devices: first, by examining two theories for explaining rising higher education costs and their different policy consequences, and then by presenting an administrative process for improving productivity that focuses on…

  18. Toward an Applied Administrative Science.

    Science.gov (United States)

    Dunbar, Roger L. M.

    1983-01-01

    A study of 65 articles from the 1981 volumes of "Administrative Science Quarterly" and "Harvard Business Review," using smallest space analysis, found that the few studies adopting subjective (instead of objective) approaches to analyzing organizational change were most likely to provide a basis for an applied administrative science. (Author/RW)

  19. High specific power flexible integrated IMM photovoltaic blanket Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Originally designed for space applications, multi-junction solar cells have a high overall power conversion efficiency (>30%) which compares favorably to...

  20. Advanced Radiative Emitters for Radioisotope Thermophotovoltaic Power Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Radioisotope Power Systems (RPS) are critical for future flagship exploration missions in space and on planetary surfaces. Small improvements in the RPS...

  1. High Efficiency Hall Thruster Discharge Power Converter Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Busek leveraged previous, internally sponsored, high power, Hall thruster discharge converter development which allowed it to design, build, and test new printed...

  2. Emotional Intelligence in School Administrators

    Directory of Open Access Journals (Sweden)

    Emine BABAOĞLAN

    2010-04-01

    Full Text Available One of the variables that affects success in business life is emotional intelligence of working people. The purpose of this research is to identify whether the school administrators’ emotional intelligence scores differ meaningfully according to their gender, marital status, branch, being a principal or assistant principal, being elementary school administrator or high school administrator, having manegerial education course or not, educational background, period of occupational service, age, length of administration service, number of children. 180 administrators working as a principals and vise principals who worked in 2005 in Düzce elementary schools and high schools were surveyed in line with this aim. Mann-Whitney U-test, Kruskal Wallis test and ANOVA were used in order to find out groups that differ from others. It has been found that school administrators’ emotional intelligence scores differ meaningfully in terms of administrators’ branch and being elementary school administrator or high school.

  3. Court Administrators and the Judiciary — Partners in the Delivery of Justice

    Directory of Open Access Journals (Sweden)

    Wayne Stewart Martin

    2014-12-01

    Full Text Available This article examines several topics relating to the administration and governance of courts in democratic societies.  It includes a summary of the development of court administration as a profession, highlighting Australia and the United States.  The summary includes a discussion of how judges and court administrators must work together and coordinate their efforts in key areas of court administration and management.  The article also reviews separation of powers issues, highlighting the problems that emerge in systems in which oversight and administration of the courts is vested in the executive branch or power of government, most commonly in a justice ministry.  It reviews the practical advantages of having courts governed and managed through institutional mechanisms within the judicial power rather than the executive power.

  4. Administration on Intellectual and Developmental Disabilities

    Science.gov (United States)

    ... Us Home > Programs & Activities > Administration on Disabilities > AIDD Administration on Intellectual and Developmental Disabilities (AIDD) Realizing the ... AIDD has a new address and phone number: Administration for Intellectual and Developmental Disabilities, Administration for Community ...

  5. Normative Power

    DEFF Research Database (Denmark)

    The social sciences have many different understandings of ‘normative power', but in European Union (EU) studies normative power has three particular meanings. The first meaning of normative power is its emphasis on normative theory, that is, how we judge and justify truth claims in social science....... The second meaning of normative power is as a form of power that is ideational rather than material or physical. The third meaning of normative power is as a characterisation of an ideal type of international actor. Empirical studies of normative forms of power have analysed both the causal and constitutive...... effects of EU relations with the world in areas ranging from inter-regional relations, through traditional diplomacy, to environmental politics. Research areas of particular interest include the study of the interplay between physical, material and normative forms of power, as well as the constitutive...

  6. Power Electronics

    DEFF Research Database (Denmark)

    Iov, Florin; Ciobotaru, Mihai; Blaabjerg, Frede;

    2008-01-01

    The global electrical energy consumption is still rising and there is an urgent demand to increase the power capacity. It is expected that the power capacity has to be doubled within 20 years. The production, distribution and use of energy should be as efficient as possible and incentives to save...... energy at the end-user should also be set up. Deregulation of energy has in the past lowered the investment in larger power plants, which means the need for new electrical power sources will be high in the near future. Two major technologies will play important roles to solve the future problems. One...... is to change the electrical power production sources from the conventional, fossil (and short term) based energy sources to renewable energy resources. The other is to use high efficient power electronics in power generation, power transmission/distribution and end-user application. This paper discuss the most...

  7. Electric Power

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    @@ China Council for the Promotion of International Trade Electric Power Industry Office (CCPIT Electric Power), one of the pro-fessional industrial branches of China Council for the Promotion of International Trade (CCPIT), was established in 2006.

  8. Reasons for the cancellation of the administrative decision by the administrative court

    Directory of Open Access Journals (Sweden)

    Xhemazie Ibraimi

    2016-07-01

    Full Text Available Law enforcement is one of the main goals in the construction, development and strengthening of a state. The principle of legality presupposes respect, strict and mandatory implementation of the Constitution, laws and other legal acts by all state bodies, institutions and public authorities, officials, NGOs and citizens. The state as a whole through its powers controls the precise and uniform application of the Constitution and other legal acts together with the law. On the basis of these constitutional principles of a state the administration should act as well, in order to fulfill its duties and not to affect and prejudice the rights and interests of citizens. In order for this to be accomplished the administration should not violate the interests and rights of citizens as well as public interest. It is necessary for all stakeholders to respect and implement the fundamental constitutional principles, since all people are prone to make mistakes and violations of the rights of citizens, some of ignorance and others from the misapplication and misinterpretation of law. In order for all this activity to be regular by the executers of administrative power, it is necessary to carry out supervision and permanent control both in terms of the devolutive principle (the highest bodies control the underrated bodies.

  9. Power marketing

    International Nuclear Information System (INIS)

    One of the most significant developments in the US electric power industry in recent years has been the phenomenal growth of power marketing. What was barely a blimp on the radar screen in 1992 has turned out to be a jumbo jet. This article explains what is power marketing who are power marketers, what role play these players and what will be their longer-term impact on the traditional industry

  10. Nuclear power

    International Nuclear Information System (INIS)

    The subject is covered in chapters entitled: nuclear power certainties and doubts; nuclear power in the Western World to 2000; the frequency of core meltdown accidents; hidden costs of the accident at Three Mile Island; costs of nuclear accidents - implications for reactor choice; defining the risks of nuclear power; the uncertain economics of a nuclear power program; the economics of enabling decisions (Sizewell B as an enabling decision); trade in nuclear electricity; some pointers to the future. (U.K.)

  11. Low Cost Radiator for Fission Power Thermal Control Project

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA Glenn Research Center (GRC) is developing fission power system technology for future space transportation and surface power applications. The early systems are...

  12. Radiation Tolerant Low Power Precision Time Source Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The availability of small, low power atomic clocks is now a reality for ground-based and airborne navigation systems. Kernco's Low Power Precision Time Source...

  13. Accelerated Aging with Electrical Overstress and Prognostics for Power MOSFETs

    Data.gov (United States)

    National Aeronautics and Space AdministrationPower electronics play an increasingly important role in energy applications as part of their power converter circuits. Understanding the behavior of these devices,...

  14. Three Phase Resonant DC Power Converter for Ion Thrusters Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Our phase 1 study has revealed many significant benefits of a new class of DC-to-DC power converters with performance that cannot be matched by current flight power...

  15. Wide Output Range Power Processing Unit for Electric Propulsion Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A power supply concept capable of operation over 25:1 and 64:1 impedance ranges at full power has been successfully demonstrated in our Phase I effort at...

  16. Prognostics-Enabled Power Supply for ADAPT Testbed Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Ridgetop's role is to develop electronic prognostics for sensing power systems in support of NASA/Ames ADAPT testbed. The prognostic enabled power systems from...

  17. Diagnosing Faults in Electrical Power Systems of Spacecraft and Aircraft

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical power systems play a critical role in spacecraft and aircraft, and they exhibit a rich variety of failure modes. This paper discusses electrical power...

  18. Advanced Capacitors for High-Power Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — As the consumer and industrial requirements for compact, high-power-density, electrical power systems grow substantially over the next decade; there will be a...

  19. Low Cost Radiator for Fission Power Thermal Control Project

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA GRC is developing fission power system technology for future space transportation and surface power applications. The early systems are envisioned in the 10 to...

  20. Nuclear Systems (NS): Kilopower Small Fission Power Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Nuclear power systems enable human and robotic exploration missions to solar system locations where other power system alternatives are infeasible,...

  1. Administrative changes (Consequential Provisions) Act 1976, No. 91

    International Nuclear Information System (INIS)

    This Act which amends a series of Acts from the viewpoint of administrative changes also amends the Atomic Energy Act 1953 by laying down that the Territories of Papua and New Guinea are henceforth to be omitted from the list of Territories for which the Atomic Energy Commission must obtain approval from the competent Minister before exercising its powers. (NEA)

  2. An Analysis of Administrative Corruption (Administrative Organizations of Yazd City)

    OpenAIRE

    Mansour Haghighatian; Somayeh Karimizadeh; Javad Nazari

    2013-01-01

    Introduction   Administrative corruption is a complicated and multi-faceted phenomenon that has many causes and ramifications, which manifest themselves in different forms in various countries and appear to be endemic of all social systems where authority is delegated. Although there might be different definitions of and approaches towards administrative corruption, the definition that has been put forward by the World Bank and Transparency International appears to be more general and compreh...

  3. ROMANIAN ADMINISTRATIVE CAPACITY OF EUROPEAN FUNDS ABSOBTION

    Directory of Open Access Journals (Sweden)

    Irina Bosie (Ungureanu

    2011-12-01

    Full Text Available The capacity to absorb European funds is part of a state complex integrated admninistrative capacity, a component of a state as a whole. The analysis in this article starts from the theoretical development by studying the reports made by the Romanian Government, correlated with the European Union reports on funds and Romanian legislation. This analysis of the EU's structural funds, highlights the importance of accessing them and the degree to which Romania and member countries benefits of income support.European funds are meant to supplement a member of the Union funds to the extent that they are accessed through the projects. Money allocated on type of operation is distributed in amounts proportionate to that state needs. Money distributed will be justified by their realization of infrastructure projects, environment, transport, human resources development, rural and regional development.Theoretical research lay the foundation for determining administrative capacity in Romania from the first time of defining the concept until now. Empirical research reveals the degree of absorption of which is that Romania has in comparison with some EU countries, former socialist countries present democratic states.The absorption capacity of European funds determine the strength of a state administrative management issues in the management of monetary dated. Power in handling management administrative problems can be efficient in higher manner and it’s represented by cost-benefit analysis and the degree of satisfaction of citizen interest. As public services are financially supported and developed, the degree of citizen satisfaction is greater in an implemented decentralized administrative system.

  4. Digitale kort og administrative registre

    DEFF Research Database (Denmark)

    Hansen, H. S.; Skov-Petersen, H.

    Rapporten indeholder dels en beskrivelse af de vigtigste nationale databaser med stedfæstet information og dels en vejledning i sammenstilling imellem digitale kort og administrative registre. Rapportens første del beskriver de enkelte databaser med hensyn til bl.a. adgangsforhold, indhold og...... nøgler, hvoraf sidstnævnte spiller en afgørende rolle i forbindelse med sammenstilling af digitale kort og administrative registre. Rapportens anden del fokuserer på praktiske forsøg med sammenstilling af digitale kort og administrative register. Der gives anvisninger på sammenstilling af Bygnings- og...

  5. Transcultural perspectives in nursing administration.

    Science.gov (United States)

    Andrews, M M

    1998-11-01

    Population demographics are reshaping the healthcare work force with respect to race, ethnicity, gender, national origin, sexual orientation, age, handicap, disability, and related factors as national sensitivity to various forms of diversity grows. Given the demographic trends, it is inevitable that nurse administrators will need skill in transcultural administration as they manage diversity and identify the cultural origins of conflict in the multicultural workplace. Culture influences the manner in which administrators, staff and patients perceive, identify, define and solve problems. In this article, the complex and interrelated factors that influence workplace diversity are examined. PMID:9824983

  6. Environmental recordkeeping: The administrative record

    Energy Technology Data Exchange (ETDEWEB)

    Sprouse, B.S.

    1991-08-01

    This document provides information on an environmental records management system. It includes information on environmental recordkeeping; environmental regulations with emphasis on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); and the administrative record including a case study of the Hanford Site's administrative record system. This paper will focus on the following objectives: (1) Identify resources that can be used as reference tools; (2) understand the reasons for developing and maintaining an administrative record; and, (3) evaluate an existing system and identify means of complying with the regulations. 15 refs., 2 figs.

  7. Superconducting Resonant Inductive Power Coupling Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed effort will develop a technology to wirelessly and efficiently transfer power over hundreds of meters via resonant inductive coupling. The key...

  8. School Boards -- Losing Power or Influence

    Science.gov (United States)

    Wynia, Bob

    1973-01-01

    The authority of school boards is being eroded by teacher militancy, administrative professionalism, and technology. Boards are performing a legal rather than a deliberative function. Court decisions regarding due process are forcing important adjustments in board power. (Author/WM)

  9. Nanostructured electrodes for Solar Power Generation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The key to achieving high-power solar arrays for NASA applications is the development of high-efficiency, thin-film solar cells that can be fabricated directly on...

  10. EPA Facility Registry Service (FRS): Power Plants

    Data.gov (United States)

    U.S. Environmental Protection Agency — This GIS dataset contains data on power plants, based on the Energy Information Administration's EIA-860 dataset and supplemented with data from EPA's Facility...

  11. Self-Powered Magnetothermal Fluid Pump Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in the capabilities of electronics have enabled high power density devices. However, even in light of advances in electronics efficiency figures, the...

  12. High Power Helicon Plasma Propulsion Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed work seeks to develop and optimize an electrode-less plasma propulsion system that is based on a high power helicon (HPH) that is being developed...

  13. Non-Powered Spectrophotometry for Lighting Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The spectrum of a light affects crew health.  This solution does not require power or a calibration cycle. The premise is that an optical solution is...

  14. Modular Stirling Power System (MSPS) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Infinia Technology Corporation's (ITC) proposed Modular Stirling Power System (MSPS) is a free-piston Stirling system that addresses NASA needs in 12-kW increments....

  15. Deep Space Cryogenic Power Electronics Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Technology Application, Inc. (TAI) is proposing to demonstrate feasibility of implementing silicon germanium (SiGe) strained-gate technology in the power...

  16. High Power Helicon Plasma Propulsion Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A new thruster has been conceived and tested that is based on a high power helicon (HPH) plasma wave. In this new method of propulsion, an antenna generates and...

  17. Lunar Surface Solar Electric Power System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose a concentrated photovoltaic electric power system for lunar operations called C-Lite Lunar. The novel technology produces a near-term solar array system...

  18. Radioisotope Power Systems Technology Development Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Radioisotope Power Systems (RPS) is a multicenter, multiagency (with the Department of Energy (DOE)) program whose purpose is to manage the Science Mission...

  19. Low Power Reconfigurable FPGA Transponder Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Under this initiative, a prototype Ka-Band exciter and receiver are under development; suitable FPGAs that are lower power than the Virtex 5 but still compatible...

  20. Low Power Mass Spectrometer employing TOF Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A low power Mass Spectrometer employing multiple time of flight circuits for parallel processing is possible with a new innovation in design of the Time of flight...

  1. Power Divider

    OpenAIRE

    Chen, Yu Christine; Dhople, Sairaj

    2015-01-01

    This paper derives analytical closed-form expressions that uncover the contributions of nodal active- and reactive-power injections to the active- and reactive-power flows on transmission lines in an AC electrical network. Paying due homage to current- and voltage-divider laws that are similar in spirit, we baptize these as the power divider laws. Derived from a circuit-theoretic examination of AC power-flow expressions, the constitution of the power divider laws reflects the topology and vol...

  2. Nuclear power

    International Nuclear Information System (INIS)

    This chapter of the final report of the Royal Commission on Electric Power Planning in Ontario updates its interim report on nuclear power in Ontario (1978) in the light of the Three Mile Island accident and presents the commission's general conclusions and recommendations relating to nuclear power. The risks of nuclear power, reactor safety with special reference to Three Mile Island and incidents at the Bruce generating station, the environmental effects of uranium mining and milling, waste management, nuclear power economics, uranium supplies, socio-political issues, and the regulation of nuclear power are discussed. Specific recommendations are made concerning the organization and public control of Ontario Hydro, but the commission concluded that nuclear power is acceptable in Ontario as long as satisfactory progress is made in the disposal of uranium mill tailings and spent fuel wastes. (LL)

  3. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  4. Case and Administrative Support Tools

    Data.gov (United States)

    U.S. Environmental Protection Agency — Case and Administrative Support Tools (CAST) is the secure portion of the Office of General Counsel (OGC) Dashboard business process automation tool used to help...

  5. State Lands by Administrator - County

    Data.gov (United States)

    Minnesota Department of Natural Resources — DNR land ownership and administrative interest mapped to the PLS forty level. This layer merges the DNR Control Point Generated PLS layer with IBM mainframe-based...

  6. State Lands by Administrator - Wildlife

    Data.gov (United States)

    Minnesota Department of Natural Resources — DNR land ownership and administrative interest mapped to the PLS forty level. This layer merges the DNR Control Point Generated PLS layer with IBM mainframe-based...

  7. Managerial Techniques in Educational Administration.

    Science.gov (United States)

    Lane, John J.

    1983-01-01

    Management techniques developed during the past 20 years assume the rational bureaucratic model. School administration requires contingent techniques. Quality Circle, Theory Z, and the McKenzie 7-Framework are discussed as techniques to increase school productivity. (MD)

  8. The Land Administration Domain Model

    NARCIS (Netherlands)

    Lemmen, C.; Van Oosterom, P.J.M.; Bennett, R.

    2015-01-01

    Societal drivers including poverty eradication, gender equality, indigenous recognition, adequate housing, sustainable agriculture, food security, climate change response, and good governance, influence contemporary land administration design. Equally, the opportunities provided by technological dev

  9. US Fire Administration Fire Statistics

    Data.gov (United States)

    Department of Homeland Security — The U.S. Fire Administration collects data from a variety of sources to provide information and analyses on the status and scope of the fire problem in the United...

  10. HUD Administrative Law Judges Decisions

    Data.gov (United States)

    Department of Housing and Urban Development — This site contains substantive and precedential decisions issued by the Office of Administrative Law Judges. The site does not contain subsequent rulings or...

  11. Occupational Safety and Health Administration

    Science.gov (United States)

    ... Twitter Instagram RSS Subscribe Occupational Safety and Health Administration About OSHA A to Z Index Contact Us FAQs What's New English | Spanish MENU OSHA Search For Workers File a Complaint OSHA 10-Hour Card Personal Protective ...

  12. State Lands by Administrator - Forestry

    Data.gov (United States)

    Minnesota Department of Natural Resources — DNR land ownership and administrative interest mapped to the PLS forty level. This layer merges the DNR Control Point Generated PLS layer with IBM mainframe-based...

  13. State Lands by Administrator - Fisheries

    Data.gov (United States)

    Minnesota Department of Natural Resources — DNR land ownership and administrative interest mapped to the PLS forty level. This layer merges the DNR Control Point Generated PLS layer with IBM mainframe-based...

  14. Stockholm Power Tech. Power systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The proceedings from this symposium is presented in six volumes: Invited speakers` sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  15. Stockholm Power Tech. Power systems

    International Nuclear Information System (INIS)

    The proceedings from this symposium is presented in six volumes: Invited speakers' sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  16. THE ADMINISTRATIVE JUSTICE IN SPAIN: CURRENT SITUATION AND CHALLENGES

    Directory of Open Access Journals (Sweden)

    R.J. Sánchez

    2016-01-01

    Full Text Available Since the Spanish Constitution of 1978 there has been a full and effective administrative justice. The citizens have the possibility to request a judicial review of decisions taken by the public Administrations, while being either the owners of a subjective right or of a legitimate interest. The interim judicial protection is not limited to the suppression of the act or general provision and the Courts are invested with direct powers to enforce their sentences. However, different problematic issues about the inactivity of the public Administrations and the enforcement of sentences are the new challenges to ensure the administrative justice. To this it must be added that there are problems regarding the inefficient work of Courts.

  17. PostgreSQL administration essentials

    CERN Document Server

    Schönig, Hans-Jürgen

    2014-01-01

    If you are a database administrator who needs to get to grips with PostgreSQL quickly and efficiently, then this book is for you. This book will also be highly beneficial if you are a project leader or a developer who is interested in knowing more about database systems or bottleneck detection, as it will enable you to work more closely and cooperatively with your administrators.

  18. Administrative bias in South Africa

    Directory of Open Access Journals (Sweden)

    E S Nwauche

    2005-01-01

    Full Text Available This article reviews the interpretation of section 6(2(aii of the Promotion of Administrative Justice Act which makes an administrator “biased or reasonably suspected of bias” a ground of judicial review. In this regard, the paper reviews the determination of administrative bias in South Africa especially highlighting the concept of institutional bias. The paper notes that inspite of the formulation of the bias ground of review the test for administrative bias is the reasonable apprehension test laid down in the case of President of South Africa v South African Rugby Football Union(2 which on close examination is not the same thing. Accordingly the paper urges an alternative interpretation that is based on the reasonable suspicion test enunciated in BTR Industries South Africa (Pty Ltd v Metal and Allied Workers Union and R v Roberts. Within this context, the paper constructs a model for interpreting the bias ground of review that combines the reasonable suspicion test as interpreted in BTR Industries and R v Roberts, the possibility of the waiver of administrative bias, the curative mechanism of administrative appeal as well as some level of judicial review exemplified by the jurisprudence of article 6(1 of the European Convention of Human Rights, especially in the light of the contemplation of the South African Magistrate Court as a jurisdictional route of judicial review.

  19. Administration of punishment in school

    Directory of Open Access Journals (Sweden)

    Lalić Nataša Z.

    2003-01-01

    Full Text Available Giving consideration to punishment, one of the inevitable elements of school discipline, always reactivates the issue of punishment administration and its effects in school setting. Punishment is administered by a beforehand-determined intention, its general and final goal being the attempt to make a child change his/her behavior so as to more successfully take part in school life. The issue of how much it is justifiable to administer punishment, as a way of directing child’s behavior, is not only raised in professional discussions but occurs as a personal dilemma with parents, teachers and all those involved in child upbringing. The definition of punishment contains certain incompatible elements in attitudes, which is reflected in punishment administration within different social contexts. Based on the analysis of research results, the paper discusses all the elements the teacher should be well acquainted with, influencing the effectiveness of punishment. The effects of punishment administration depend, among other things, on the type of punishment, way in which a person experiences and perceives punishment and the way of administering it. Prior to punishment administration, as a means of directing child’s behavior factors influencing successfulness of punishment should be established consistency in punishment administration, postponement of punishment intensity of punishment, explanation for punishment administration, nature of interrelations between a child and a person punishing him/her.

  20. Nuclear Propulsion and Power Non-Nuclear Test Facility (NP2NTF): Preliminary Analysis and Feasibility Assessment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Nuclear reactors, which power nuclear propulsion and power systems, and the nuclear radiation and residual radioactivity associated with these systems, impose...