WorldWideScience

Sample records for bonneville dam 2004-2005

  1. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  2. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence

  3. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Friesen, Thomas A. (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-02-01

    Pacific salmon Oncorhynchus spp. populations have declined over the last century due to a variety of human impacts. Chum salmon O. keta populations in the Columbia River have remained severely depressed for the past several decades, while upriver bright (URB) fall Chinook salmon O. tschawytscha populations have maintained relatively healthy levels. For the past seven years we have collected data on adult spawning and juvenile emergence and outmigration of URB fall Chinook and chum salmon populations in the Ives and Pierce islands complex below Bonneville Dam. In 2004, we estimated 1,733 fall Chinook salmon and 336 chum salmon spawned in our study area. Fall Chinook salmon spawning peaked 19 November with 337 redds and chum salmon spawning peaked 3 December with 148 redds. Biological characteristics continue to suggest chum salmon in our study area are similar to nearby stocks in Hardy and Hamilton creeks, and Chinook salmon we observe are similar to upriver bright stocks. Temperature data indicated that 2004 brood URB fall Chinook salmon emergence began on 6 January and ended 27 May 2005, with peak emergence occurring 12 March. Chum salmon emergence began 4 February and continued through 2 May 2005, with peak emergence occurring on 21 March. Between 13 January and 28 June, we sampled 28,984 juvenile Chinook salmon and 1,909 juvenile chum salmon. We also released 32,642 fin-marked and coded-wire tagged juvenile fall Chinook salmon to assess survival. The peak catch of juvenile fall Chinook salmon occurred on 18 April. Our results suggested that the majority of fall Chinook salmon outmigrate during late May and early June, at 70-80 mm fork length (FL). The peak catch of juvenile chum salmon occurred 25 March. Juvenile chum salmon appeared to outmigrate at 40-55 mm FL. Outmigration of chum salmon peaked in March but extended into April and May.

  4. Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

    2008-12-01

    In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific

  5. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rien, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-03-01

    We report on our progress from April 2004 through March 2005 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  6. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  7. Lower Granite Dam Smolt Monitoring Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mensik, Fred; Rapp, Shawn; Ross Doug (Washington Department of Fish and Wildlife, Olympia, WA)

    2005-11-01

    The 2004 fish collection season at Lower Granite Dam (LGR) was characterized by above average water temperatures, below average flows and spill, low levels of debris. The number of smolts collected for all species groups (with the exception of clipped and unclipped sockeye/kokanee) exceeded all previous collection numbers. With the continued release of unclipped supplementation chinook, steelhead and sockeye above LGR, we can not accurately distinguish wild chinook, wild steelhead and wild sockeye/kokanee from hatchery reared unclipped chinook and sockeye/kokanee in the sample. Wild steelhead can be identified from hatchery steelhead by the eroded dorsal and pectoral fins exhibited on unclipped hatchery steelhead. The numbers in the wild columns beginning in 1998 include wild and unclipped hatchery origin smolts. This season a total of 11,787,539 juvenile salmonids was collected at LGR. Of these, 11,253,837 were transported to release sites below Bonneville Dam, 11,164,132 by barge and 89,705 by truck. An additional 501,395 fish were bypassed to the river due to over-capacity of the raceways and for research purposes. According to the PTAGIS database, 177,009 PIT-tagged fish were detected at LGR in 2004. Of these, 105,894 (59.8%) were bypassed through the PIT-tag diversion system, 69,130 (39.1%) were diverted to the raceways to be transported, 1,640 (0.9%) were diverted to the sample tank, sampled and then transported, 345 (0.2%) were undetected at any of the bypass, raceway or sample exit monitors.

  8. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  9. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  10. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  11. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  12. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  13. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  14. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  15. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  16. 1998-1999 evaluation of fall chinook and chum salmon spawning below Bonneville, The Dalles, John Day and McNary dams

    International Nuclear Information System (INIS)

    Naald, W.D. van der

    2001-01-01

    This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6

  17. Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

    2008-03-12

    The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

  18. Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1; FINAL

    International Nuclear Information System (INIS)

    Carlson, Thomas J

    2001-01-01

    This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories

  19. White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2005-08-01

    We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  20. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  1. Lower Granite Dam Smolt Monitoring Program, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mensik, Fred; Rapp, Shawn; Ross, Doug (Washington Department of Fish and Wildlife, Olympia, WA)

    2007-01-01

    The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers

  2. Lower Granite Dam Smolt Monitoring Program, Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Menski, Fred

    2007-01-01

    The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers

  3. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  4. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batten, G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  5. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam Report C, Annual Progress Report April 2003 - March 2004

    Science.gov (United States)

    Parsley, Michael J.; Gadomski, Dena M.; Kofoot, Pete

    2005-01-01

    River discharge and water temperatures that occurred during April through July 2003 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Although optimal spawning temperatures in the four tailraces occurred for less than two weeks, they coincided with a period of relatively high river discharge. Bottom-trawl sampling in Bonneville and The Dalles Reservoirs revealed the presence of young-of-the-year (YOY) white sturgeon in Bonneville Reservoir, but none were captured in The Dalles Reservoir. A comparison of five years of indices of abundance of YOY sturgeon from sampling done by ODFW with gillnets and the USGS with bottom trawls was completed. Despite obvious differences in gear sampling characteristics (e.g. one gear is actively fished, one passively fished), it appears that either gear can be used to assess relative trends in YOY white sturgeon abundance. The analyses suffered due to poor catches of YOY fish, as YOY were only captured in The Dalles Reservoir during three of the five years of comparison sampling, and during only one of four years in John Day Reservoir. However, both gears detected the presence or absence of YOY white sturgeon within a reservoir equally. That is, if any YOY white sturgeon were captured in any year in a reservoir, both gears captured at least one fish, and if one gear failed to collect any YOY white sturgeon, both gears failed. Concerns have been raised that the Wang et al. (1985) egg development relationships for Sacramento River white sturgeon may not be applicable to Columbia Basin stocks. However, using laboratory experiments with white sturgeon eggs incubated at 10, 12, 15, and 18o C, we found no significant differences in development rates of eggs of Columbia, Kootenai, Snake, and Sacramento river fish.

  6. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  7. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  8. Hydraulic alterations resulting from hydropower development in the Bonneville Reach of the Columbia River

    Science.gov (United States)

    Hatten, James R.; Batt, Thomas R.

    2010-01-01

    We used a two-dimensional (2D) hydrodynamic model to simulate and compare the hydraulic characteristics in a 74-km reach of the Columbia River (the Bonneville Reach) before and after construction of Bonneville Dam. For hydrodynamic modeling, we created a bathymetric layer of the Bonneville Reach from single-beam and multi-beam echo-sounder surveys, digital elevation models, and navigation surveys. We calibrated the hydrodynamic model at 100 and 300 kcfs with a user-defined roughness layer, a variable-sized mesh, and a U.S. Army Corps of Engineers backwater curve. We verified the 2D model with acoustic Doppler current profiler (ADCP) data at 14 transects and three flows. The 2D model was 88% accurate for water depths, and 77% accurate for velocities. We verified a pre-dam 2D model run at 126 kcfs using pre-dam aerial photos from September 1935. Hydraulic simulations indicated that mean water depths in the Bonneville Reach increased by 34% following dam construction, while mean velocities decreased by 58%. There are numerous activities that would benefit from data output from the 2D model, including biological sampling, bioenergetics, and spatially explicit habitat modeling.

  9. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  10. Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Lynn (Nez Perce Soil and Conservation District, Lewiston, ID)

    2006-07-01

    The ''Restoring Anadromous Fish Habitat in the Big Canyon Creek Watershed'' is a multi-phase project to enhance steelhead trout in the Big Canyon Creek watershed by improving salmonid spawning and rearing habitat. Habitat is limited by extreme high runoff events, low summer flows, high water temperatures, poor instream cover, spawning gravel siltation, and sediment, nutrient and bacteria loading. Funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council's Fish and Wildlife Program, the project assists in mitigating damage to steelhead runs caused by the Columbia River hydroelectric dams. The project is sponsored by the Nez Perce Soil and Water Conservation District. Target fish species include steelhead trout (Oncorhynchus mykiss). Steelhead trout within the Snake River Basin were listed in 1997 as threatened under the Endangered Species Act. Accomplishments for the contract period September 1, 2004 through October 31, 2005 include; 2.7 riparian miles treated, 3.0 wetland acres treated, 5,263.3 upland acres treated, 106.5 riparian acres treated, 76,285 general public reached, 3,000 students reached, 40 teachers reached, 18 maintenance plans completed, temperature data collected at 6 sites, 8 landowner applications received and processed, 14 land inventories completed, 58 habitat improvement project designs completed, 5 newsletters published, 6 habitat plans completed, 34 projects installed, 2 educational workshops, 6 displays, 1 television segment, 2 public service announcements, a noxious weed GIS coverage, and completion of NEPA, ESA, and cultural resources requirements.

  11. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  12. Western Pond Turtle Head-starting and Reintroduction; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Van Leuven, Susan; Allen, Harriet; Slavin, Kate (Washington Department of Fish and Wildlife, Wildlife Management Program, Olympia, WA)

    2005-09-01

    population. Bonneville Power Administration (BPA) funded approximately 75% of program activities in the Columbia River Gorge from October 2004 through September 2005.

  13. End-of-year-closure 2004/2005

    CERN Multimedia

    Human Resources Department

    2004-01-01

    As announced in Weekly Bulletin Nº 3/2004, the Laboratory will be closed from Saturday 18 December 2004 to Sunday 2 January 2005 inclusive. This period consists of 16 days: 4 days' official holiday, i.e. 24, 25 and 31 December 2004 and 1st January 2005; 6 days' special paid leave in accordance with Article R II 4.34 of the Staff Regulations, i.e. 20, 21, 22, 27, 28, and 29 December 2004; 1 Saturday, i.e. 18 December 2004; 2 days, 23 December 2004 to compensate for 25 December 2004 and 30 December 2004 to compensate for 1st January 2005 (Article R II 4.33 of the Staff Regulations); 3 Sundays, i.e. 19 and 26 December 2004 and 2 January 2005. The first working day in the New Year will be Monday 3 January 2005. Further information will be available from Department Secretariats, specifically concerning the conditions applicable to members of the personnel who are required to work during this period. Human Resources Department Tel. 74474

  14. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam

    International Nuclear Information System (INIS)

    Nigro, A.A.

    1991-09-01

    We report on our progress from April 1990 through March 1991 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from NcNary Dam; to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam; to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams; and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights of results of this work in the Dalles, Bonneville and John Day reservoirs are included in the four pages included in this report

  15. Relative survival of juvenile chinook salmon (Oncorhynchus tshawyischa) through a Bonneville dam on the Columbia River

    International Nuclear Information System (INIS)

    Ferguson, J.

    1993-01-01

    The Bonneville Dam second powerhouse bypass system for juvenile salmon has one 6.1-m submersible travelling screen in each intake of all eight turbines, for a total of 24 screens. These screens set up a hydraulic cushion that deflects juvenile salmon away from the turbine intakes and into vertical bulkhead slots, from which they exit by their own volition into a collection gallery that travels the length of the powerhouse to a dewatering station and the outlet. A multiple-year evaluation was conducted on the comparative survival of subyearling chinook salmon through various passage modes at the dam. Using this information, operational scenarios could then be formulated to provide additional juvenile protection while meeting power system demands. In the summer, the juvenile salmon that passed through the bypass system had significantly lower survival rates than upper and lower turbine, spillway, and downstream control groups. Predation by northern squawfish (Ptychocheilus oregonensis) was suspected to have been the cause of high mortalities among bypassed fish. No significant differences existed between survival rates of upper and lower turbine groups. 7 refs., 2 figs., 1 tab

  16. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1990-09-01

    We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

  17. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martinson, Rick D.; Kovalchuk, Gregory M.; Ballinger, Dean (Pacific States Marine Fisheries Commission, The Dalles, OR)

    2006-04-01

    2005 was an average to below average flow year at John Day and Bonneville Dams. A large increase in flow in May improved migration conditions for that peak passage month. Spill was provided April through August and averaged about 30% and 48% of river flow at John Day and Bonneville Dams, respectively. Water temperature graphs were added this year that show slightly lower than average water temperature at John Day and slightly higher than average temperatures at Bonneville. The number of fish handled at John Day decreased from 412,797 in 2004 to 195,293 this year. Of the 195,293 fish, 120,586 (61.7%) were collected for researchers. Last year, 356,237 (86.3%) of the fish sampled were for researchers. This dramatic decline is the result of (1) fewer research fish needed (2) a smaller, lighter tag which allowed for tagging of smaller fish, and (3) a larger average size for subyearling chinook. These factors combined to reduce the average sample rate to 10.8%, about half of last year's rate of 18.5%. Passage timing at John Day was similar to previous years, but the pattern was distinguished by larger than average passage peaks for spring migrants, especially sockeye. The large spike in mid May for sockeye created a very short middle 80% passage duration of just 16 days. Other spring migrants also benefited from the large increase in flow in May. Descaling was lower than last year for all species except subyearling chinook and below the historical average for all species. Conversely, the incidence of about 90% of the other condition factors increased. Mortality, while up from last year for all species and higher than the historical average for all species except sockeye, continued to be low, less than 1% for all species. On 6 April a slide gate was left closed at John Day and 718 fish were killed. A gate position indicator light was installed to prevent reoccurrences. Also added this year was a PIT tag detector on the adult return-to-river flume. For the first time

  18. Walla Walla River Fish Passage Operations Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2004-2005 project year, there were 590 adult summer steelhead, 31 summer steelhead kelts (Oncorhynchus mykiss), 70 adult bull trout (Salvelinus confluentus); 80 adult and 1 jack spring Chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 13, 2004, and June 16, 2005. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by ODFW in order to enumerate fish passage. Of the total, 143 adult summer steelhead and 15 summer steelhead kelts were enumerated at the west ladder at Nursery Bridge Dam during the video efforts between February 4 and May 23, 2005. Operation of the Little Walla Walla River

  19. LULI 2004-2005 activity report; LULI rapport scientifique 2004-2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This document gathers the main results obtained by scientists from the LULI (laboratory for the use of intense lasers) unit in 2004-2005. It is made up of 40 short articles and is organized around 5 topics: 1) laser-matter interaction, 2) hydrodynamics, shocks, material treatment, 3) atom physics, X-ray lasers, 4) progress in optics for power lasers, and 5) instrumentation and other advances.

  20. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rakowski, Cynthia L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Perkins, William A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Richmond, Marshall C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  1. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

    2001-05-01

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  2. Higher demand and production in 2004, but growth wavers in 2005 : markets for paper, paperboard and woodpulp, 2004-2005

    Science.gov (United States)

    Peter J. Ince; Eduard Akim; Bernard Lombard; Tomas Parik

    2005-01-01

    Global pulp, paper and paperboard markets improved in 2004 and 2005, as indicated by generally higher prices for most pulp, paper and paperboard products in comparison with 2003. While growth in demand was quite robust in 2004, by the end of the first half of 2005, markets appeared more hesitant and prices appeared to waver or reach a plateau. Within the UNECE region,...

  3. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004

    International Nuclear Information System (INIS)

    Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J.; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

    2005-01-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than ∼7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile

  4. An Investigation on Water Quality of Darlik Dam Drinking Water using Satellite Images

    Directory of Open Access Journals (Sweden)

    Erhan Alparslan

    2010-01-01

    Full Text Available Darlik Dam supplies 15% of the water demand of Istanbul Metropolitan City of Turkey. Water quality (WQ in the Darlik Dam was investigated from Landsat 5 TM satellite images of the years 2004, 2005, and 2006 in order to determine land use/land cover changes in the watershed of the dam that may deteriorate its WQ. The images were geometrically and atmospherically corrected for WQ analysis. Next, an investigation was made by multiple regression analysis between the unitless planetary reflectance values of the first four bands of the June 2005 Landsat TM image of the dam and WQ parameters, such as chlorophyll-a, total dissolved matter, turbidity, total phosphorous, and total nitrogen, measured at satellite image acquisition time at seven stations in the dam. Finally, WQ in the dam was studied from satellite images of the years 2004, 2005, and 2006 by pattern recognition techniques in order to determine possible water pollution in the dam. This study was compared to a previous study done by the authors in the Küçükçekmece water reservoir, also in Istanbul City.

  5. Wind River Watershed Restoration 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, Patrick J.; Jezorek, Ian G. [U.S. Geological Survey

    2008-11-10

    (PIT) tags to track growth and movement of individuals. We snorkeled nine stream sections during 2004. Juvenile steelhead populations have varied greatly between streams and between years. Numbers of age-0 steelhead have increased substantially since 2000 within the MINE reach (rkm 35.0-40.0) section of the upper Wind River. Because of potential negative interactions with steelhead, naturally spawned populations of introduced juvenile Chinook salmon are of concern in the mainstem of the Wind River. During 2004, we deployed over 3,000 PIT tags in the Wind River subbasin, primarily in juvenile steelhead, but also in juvenile Chinook. We are compiling a dataset of recapture information on these tagged fish as well as interrogation information from Bonneville Dam and other sites. The habitat and fish data collected have been used in Ecosystem Diagnosis and Treatment modeling efforts, the Wind River Subbasin Plan, and the Total Maximum Daily Load report from Washington Department of Ecology. Continued monitoring of changes in habitat, combined with data on fish populations, will help guide planning efforts of land and fish managers. As long-term active and passive restoration actions are implemented in the Wind River and its tributaries, these data will provide the ability to measure change. Because the Wind River subbasin has no steelhead hatchery or supplementation, these data will be useful to compare population trends in subbasins with hatchery or supplementation management.

  6. Teatriankeet 2004/2005

    Index Scriptorium Estoniae

    2005-01-01

    Vastavad Ü. Aaloe, J. Allik, R. Avestik, M. Balbat, K. Eberhart, S. Karja, E. Kekelidze, M. Kolk, G. Kordemets, J. Kulli, V.-S. Maiste, R. Neimar, M. Pesti, P.-R. Purje, J. Rähesoo, A. Saro, I. Sillar, Ü. Tonts, L. Tormis, B. Tuch, V. Vahing. Nimetatud ka parimad lavastused 2004/2005 - "Julia" (Eesti Draamateater, lav. T. Ojasoo), "Tõde ja õigus" (Tallinna Linnateater, lav. E. Nüganen), "Põrgu wärk" (MTÜ R.A.A.A.M., lav. H. Toompere jun)

  7. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

    2005-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than {approx}7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s/m), (3) make water

  8. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.; McKinstry, C.; Cook, C. [Pacific Northwest National Laboratory

    2005-02-01

    This report documents a four-year study(a) to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss) at the entrance to the forebay of the third powerplant at Grand Coulee Dam. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). In this report, emphasis is placed on the methodology and results associated with the fourth project year and compared with findings from the previous years to provide an overall project summary. Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power and Conservation Council Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph dams on the Columbia River (Figure S.1). A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish, including kokanee and rainbow trout, were entrained annually at Grand Coulee Dam. Analysis of the data found that 85% of the total entrainment occurred at the dam's third powerplant. Because these entrainment rates represent a significant loss to the tribal fisheries upstream of the dam, they have been judged unacceptable to fishery managers responsible for perpetuating the fishery in Lake Roosevelt. In an effort to reduce fish entrainment rates, the scope of work for the Chief Joseph Kokanee Enhancement Project was modified in 2001 to include a multiyear study of the efficacy of using strobe lights to deter fish from entering the third powerplant forebay. Pacific Northwest National Laboratory initiated the four-year study in collaboration with Colville

  9. Legacy Panorama on Spirit's Way to 'Bonneville'

    Science.gov (United States)

    2005-01-01

    [figure removed for brevity, see original site] Click on the image for Legacy Panorama on Spirit's Way to 'Bonneville' (QTVR) This view captured by the panoramic camera on NASA's Mars Exploration Rover Spirit nearly a year ago is called Spirit's 'Legacy' panorama. It combines many frames acquired during Spirit's 59th through 61st martian days, or sols (March 3 to 5, 2004) from a position about halfway between the landing site and the rim of 'Bonneville Crater.' The location is within the transition from the relatively smooth plains to the more rocky and rugged blanket of material ejected from Bonneville by the force of the impact that dug the crater. The panorama spans 360 degrees and consists of images obtained in 78 individual pointings. The camera took images though 5 different filter at each pointing. This mosaic is an approximately true-color rendering generated using the images acquired through filters centered at wavelengths of 750, 530, and 480 nanometers. The Columbia Memorial Station lander can be seen about 200 meters (about 650 feet) in the distance by following the rover tracks back toward right of center in the mosaic and zooming in.

  10. Spokane Tribal Hatchery, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2006-03-01

    Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to rainbow trout catch and harvest rates while the impact on the kokanee fishery was minimal. Success of the Lake Roosevelt kokanee artificial production program appears to be limited primarily owing to predation, precocity and high entrainment rates through Grand Coulee Dam. Recommendations for future hatchery/net pen operations include use of stocks compatible or native to the upper Columbia River, continue kokanee fry and post-smolt releases, 100% triploid hatchery stock rainbow trout used and adipose fin clip hatchery stock rainbow trout prior to release. The Spokane Tribal Hatchery is funded by the Bonneville Power Administration under directives by the Northwest Power Conservation Council Columbia River Basin Fish & Wildlife Program, Resident Fish Substitution Measures, 1987 to current (Subbasin Plan), as partial mitigation for anadromous and resident fish losses in the blocked areas above Chief Joseph and Grand Coulee Dams.

  11. JAERI TANDEM annual report 2004. April 1, 2004 - March 31, 2005

    International Nuclear Information System (INIS)

    Ishii, Tetsuro; Takeuchi, Suehiro; Oshima, Masumi; Nagame, Yuichiro; Chiba, Satoshi; Sataka, Masao

    2006-01-01

    This annual report describes research activities, which have been performed with the JAERI tandem accelerator and its energy booster from April 1, 2004 to March 31, 2005. Summary reports of 48 papers, and lists of publication, personnel and cooperative research with universities are contained. The JAERI (Japan Atomic Energy Research Institute) have been unified with JNC (Japan Nuclear Fuel Cycle Development Institute) and became JAEA (Japan Atomic Energy Agency) on October 1st, 2005. (author)

  12. Kansas Satellite Image Database (KSID) 2004-2005

    Data.gov (United States)

    Kansas Data Access and Support Center — The Kansas Satellite Image Database (KSID) 2004-2005 consists of terrain-corrected, precision rectified spring, summer, and fall Landsat 5 Thematic Mapper (TM)...

  13. Official holidays in 2004 and end-of-year closure 2004/2005

    CERN Multimedia

    2004-01-01

    (Application of Articles R II 4.33 and R II 4.34 of the Staff Regulations) Official holidays in 2004 (in addition to the end-of-year holidays): - Friday, 9th April (Good Friday) - Monday, 12th April (Easter Monday) - Thursday, 20th May (Ascension Day) - Friday, 21st May Compensation granted for 1st May (Article R II 4.33 of the Staff Regulations) - Monday, 31st May (Whit Monday) - Thursday, 9th September ("Jeûne genevois") Annual closure of the site of the Organization and day of special leave granted by the Director-General: The Laboratory will be closed from Saturday, 17th December 2004 to Sunday, 2nd January 2005 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 3rd January 2005. Human Resources Division Tel. 74128

  14. LULI 2004-2005 activity report

    International Nuclear Information System (INIS)

    2005-01-01

    This document gathers the main results obtained by scientists from the LULI (laboratory for the use of intense lasers) unit in 2004-2005. It is made up of 40 short articles and is organized around 5 topics: 1) laser-matter interaction, 2) hydrodynamics, shocks, material treatment, 3) atom physics, X-ray lasers, 4) progress in optics for power lasers, and 5) instrumentation and other advances

  15. Training in AB Department 2004/2005

    CERN Document Server

    Schinzel, Josi; CERN. Geneva. AB Department

    2006-01-01

    This note provides an overview of the training attended by members of the AB Department during the years 2004 and 2005, giving a break-down of the different courses and costs as well as training directions. It describes the organisation of training in the department, and evolution in training directions and planning.

  16. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.

  17. Surveillance van respiratoire infectieziekten in 2004/2005.

    NARCIS (Netherlands)

    Dijkstra, F.; Plas, S.M. van der; Wilbrink, B.; Jong, J.C. de; Bartelds, A.I.M.

    2005-01-01

    In order to gain more clear understanding of the epidemiology of a selection of respiratory infectious diseases in The Netherlands in the season 2004/2005, epidemiological data about a selection of respiratory syndromes and pathogens (influenza-like illnesses, other acute respiratory infections,

  18. Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.

  19. Water, Ice, and Meteorological Measurements at South Cascade Glacier, Washington, Balance Years 2004 and 2005

    Science.gov (United States)

    Bidlake, William R.; Josberger, Edward G.; Savoca, Mark E.

    2007-01-01

    Winter snow accumulation and summer snow and ice ablation were measured at South Cascade Glacier, Washington, to estimate glacier mass-balance quantities for balance years 2004 and 2005. The North Cascade Range in the vicinity of South Cascade Glacier accumulated smaller than normal winter snowpacks during water years 2004 and 2005. Correspondingly, the balance years 2004 and 2005 maximum winter snow balances of South Cascade Glacier, 2.08 and 1.97 meters water equivalent, respectively, were smaller than the average of such balances since 1959. The 2004 glacier summer balance (-3.73 meters water equivalent) was the eleventh most negative during 1959 to 2005 and the 2005 glacier summer balance (-4.42 meters water equivalent) was the third most negative. The relatively small winter snow balances and unusually negative summer balances of 2004 and 2005 led to an overall loss of glacier mass. The 2004 and 2005 glacier net balances, -1.65 and -2.45 meters water equivalent, respectively, were the seventh and second most negative during 1953 to 2005. For both balance years, the accumulation area ratio was less than 0.05 and the equilibrium line altitude was higher than the glacier. The unusually negative 2004 and 2005 glacier net balances, combined with a negative balance previously reported for 2003, resulted in a cumulative 3-year net balance of -6.20 meters water equivalent. No equal or greater 3-year mass loss has occurred previously during the more than 4 decades of U.S. Geological Survey mass-balance measurements at South Cascade Glacier. Accompanying the glacier mass losses were retreat of the terminus and reduction of total glacier area. The terminus retreated at a rate of about 17 meters per year during balance year 2004 and 15 meters per year during balance year 2005. Glacier area near the end of balance years 2004 and 2005 was 1.82 and 1.75 square kilometers, respectively. Runoff from the basin containing the glacier and from an adjacent nonglacierized basin was

  20. Annual report of Kansai Research Establishment 2004. April 1, 2004 - March 31, 2005

    International Nuclear Information System (INIS)

    Harami, Taikan; Mizuki, Jun'ichiro; Aoki, Katsutoshi; Baba, Yuji; Murakami, Yoichi; Kobayashi, Keisuke; Sakai, Toru; Nagashima, Akira; Yamakawa, Koichi; Nagashima, Keisuke; Daido, Hiroyuki; Koike, Masato; Yamagiwa, Mituru; Bulanov, Sergei V.; Minehara, Eisuke

    2006-01-01

    This report is the sixth issue of the annual report of Kansai Research Establishment, Japan Atomic Energy Research Institute. It covers status report of R and D and results of experiments conducted at the Advanced Photon Research Center and Synchrotron Radiation Research Center during the period from April 1, 2004 to March 31, 2005. The JAERI (Japan Atomic Energy Research Institute) have been unified with JNC (Japan Nuclear Cycle Development Institute) and became JAEA (Japan Atomic Energy Agency) on October 1st, 2005. (author)

  1. Saying Goodbye to 'Bonneville' Crater

    Science.gov (United States)

    2004-01-01

    [figure removed for brevity, see original site] Annotated Image NASA's Mars Exploration Rover Spirit took this panoramic camera image on sol 86 (March 31, 2004) before driving 36 meters (118 feet) on sol 87 toward its future destination, the Columbia Hills. This is probably the last panoramic camera image that Spirit will take from the high rim of 'Bonneville' crater, and provides an excellent view of the ejecta-covered path the rover has journeyed thus far. The lander can be seen toward the upper right of the frame and is approximately 321 meters (1060 feet) away from Spirit's current location. The large hill on the horizon is Grissom Hill. The Colombia Hills, located to the left, are not visible in this image.

  2. LGR adult trap data - Operation of the adult trap at Lower Granite Dam

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This Bonneville Power Administration (BPA) - funded project pays for NOAA staff to operate the adult salmon trap located in the fish ladder at Lower Granite Dam. The...

  3. Epidemiological and virological assessment of influenza activity in Europe, during the 2004-2005 winter.

    NARCIS (Netherlands)

    Meijer, A.; Paget, W.J.; Meerhoff, T.J.; Brown, C.S.; Meuwissen, L.E.; Velden, J. van der

    2006-01-01

    The 2004-2005 influenza season in Europe started in late December 2004 and the first influenza activity occurred in the west and southwest (Spain, United Kingdom and Ireland). Influenza activity then moved gradually east across Europe during January and early February 2005, and from late February

  4. Biological assessment of the advanced turbine design at Wanapum Dam, 2005

    Energy Technology Data Exchange (ETDEWEB)

    Dauble, D. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Z. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Richmond, M. C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moursund, R. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, T. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rakowski, C. L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Duncan, J. P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-08-01

    Three studies were conducted to evaluate the biological performance of an advanced design turbine installed at Unit 8 of Wanapum Dam on the Columbia River in 2005 versus a conventional Kaplan turbine, Unit 9. The studies included an evaluation of blade-strike using deterministic and probabilistic models, integrated analysis of the response of the Sensor Fish to sever hydraulic events within the turbine system, and a novel dye technique to measure injury to juvenile salmonids in the field.

  5. Relation between flows and dissolved oxygen in the Roanoke River between Roanoke Rapids Dam and Jamesville, North Carolina, 2005-2009

    Science.gov (United States)

    Wehmeyer, Loren L.; Wagner, Chad R.

    2011-01-01

    The relation between dam releases and dissolved-oxygen concentration, saturation and deficit, downstream from Roanoke Rapids Dam in North Carolina was evaluated from 2005 to 2009. Dissolved-oxygen data collected at four water-quality monitoring stations downstream from Roanoke Rapids Dam were used to determine if any statistical relations or discernible quantitative or qualitative patterns linked Roanoke River in-stream dissolved-oxygen levels to hydropower peaking at Roanoke Rapids Dam. Unregulated tributaries that inundate and drain portions of the Roanoke River flood plain are crucial in relation to in-stream dissolved oxygen. Hydropower peaking from 2005 to 2009 both inundated and drained portions of the flood plain independently of large storms. The effects of these changes in flow on dissolved-oxygen dynamics are difficult to isolate, however, because of (1) the variable travel time for water to move down the 112-mile reach of the Roanoke River from Roanoke Rapids Dam to Jamesville, North Carolina, and (2) the range of in-situ conditions, particularly inundation history and water temperature, in the flood plain. Statistical testing was conducted on the travel-time-adjusted hourly data measured at each of the four water-quality stations between May and November 2005-2009 when the weekly mean flow was 5,000-12,000 cubic feet per second (a range when Roanoke Rapids Dam operations likely affect tributary and flood-plain water levels). Results of this statistical testing indicate that at the 99-percent confidence interval dissolved-oxygen levels downstream from Roanoke Rapids Dam were lower during peaking weeks than during non-peaking weeks in three of the five years and higher in one of the five years; no data were available for weeks with peaking in 2007. For the four years of statistically significant differences in dissolved oxygen between peaking and non-peaking weeks, three of the years had statistically signficant differences in water temperature. Years

  6. Were the hydro dams financed by the World Bank from 1976 to 2005 worthwhile?

    International Nuclear Information System (INIS)

    Awojobi, Omotola; Jenkins, Glenn P.

    2015-01-01

    Because hydro dams are complex to design and usually involve long-term planning, they are particularly susceptible to cost and time overruns. The controversy surrounding their development remains an unresolved issue in the energy policy debate. This study re-examines the cost issues associated with a portfolio of 58 dams that were financed by the World Bank from 1976 to 2005. Further, an estimate is made of the value of the benefits produced by these investments to determine the magnitude of economic rates of return for the individual projects and the overall portfolio of dams. Even though this portfolio of dams suffered substantially from cost overruns, the net contribution of these dams has been positive and substantial. The ex-post real economic rate of return for the entire portfolio is estimated to be greater than 17 percent. The important policy implication of this study is that each investment in a hydro dam needs to be appraised taking into consideration the distribution and probabilities of costs that might be incurred, as well as the potential benefits. Adequate margins must exist of ex-ante benefits over costs to account for the risks of cost overruns. - Highlights: • An ex-post evaluation is made of hydroelectric dams financed by the World Bank. • Cost overruns, time overruns, and the cost of time overruns are measured. • The PV of benefits produced by this portfolio was 1.8 times the PV of the costs. • Real cost overruns were 27% and cost of time overruns 3.5% of ex-ante costs. • Risks of cost overruns must be evaluated in relation to projected benefits of dams.

  7. Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

  8. Comparative Survival Study (CSS) of Hatchery PIT-tagged Spring/Summer Chinook; Migration Years 1997-2002 Mark/Recapture Activities and Bootstrap Analysis, 2003-2004 Biennial Report.

    Energy Technology Data Exchange (ETDEWEB)

    Berggren, Thomas J.; Franzoni, Henry; Basham, Larry R. (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2003-11-01

    Granite Dam. When D = 1, there is no difference in survival rate after hydrosystem passage. When D < 1, then transported smolts die at a greater rate after release below Bonneville Dam than smolts that have migrated in-river to below Bonneville Dam Major objectives of the CSS include: (1) development of a long-term index of transport SAR to in-river SAR for Snake River hatchery and wild spring and summer Chinook smolts measured at Lower Granite Dam; (2) develop a long-term index of survival rates from release of smolts at Snake River hatcheries to return of adults to the hatcheries; (3) compute and compare the overall SARs for selected upriver and downriver spring and summer Chinook hatchery and wild stocks; and (4) begin a time series of SARs for use in hypothesis testing and in the regional long-term monitoring and evaluation program. Primary CSS focus in this report is for wild and hatchery spring/summer Chinook that outmigrated in 1997 to 2002 and their respective adult returns through 2004.

  9. Bonneville - Hood River Vegetation Management Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  10. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

    2006-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The

  11. The extended teamwork 2004/2005 exploratory study. Study plan

    International Nuclear Information System (INIS)

    Skjerve, Ann Britt; Strand, Stine; Skraaning, Gyrd Jr.; Nihlwing, Christer; Helgar, Stein; Olsen, Asle; Kvilesjoe, Hans Oeyvind; Meyer, Geir; Droeivoldsmo, Asgeir; Svengren, Haakan

    2005-09-01

    The report documents the study plan for the Extended Teamwork 2004/2005 exploratory study, which is performed within the Extended Teamwork HRP research program. The purpose of the research program is to generate ideas on how teamwork in nuclear power plants may be affected by the introduction of new operational concepts. The Extended Teamwork 2004/2005 exploratory study contributes with empirical knowledge on the effect of a new operational concept, implying increased automation levels, changed operator roles, redefined competence requirements to the operators, and new technologies to support co-operation, on teamwork. The Extended Teamwork 2004/2005 exploratory study covered occurrences during the early transition phase, i.e., from the time the operators are introduced to the possible future operational environment, to the time they have completed the twelve scenarios comprised by the study. The study assessed how familiarity with operation in the possible future operational environment may affect the extent and quality of co-operation. The report accounts for the motivation for performing the exploratory study, and explains the research question. It describes the theoretical approach, which is based on Co-operation Theory, the human-centered automation approach, and theories on co-operation across distances, and introduces the concept extended teamwork. It also describes the method applied: it provides a detailed description of the possible future operational environment, including requirements with respect to autonomy and authority - both for humans and for automatic agents, and describes the technology applied to support co-operation in the control-room team. In addition, all measurement techniques applied in the study are accounted for (system logs, questionnaires, interviews, etc.). (Author)

  12. Israel Seminar 2004-2005

    CERN Document Server

    Schechtman, Gideon

    2007-01-01

    This collection of original papers related to the Israeli GAFA seminar (on Geometric Aspects of Functional Analysis) during the years 2004-2005 follows the long tradition of the previous volumes that reflect the general trends of the Theory and are a source of inspiration for research. Most of the papers deal with different aspects of the Asymptotic Geometric Analysis, ranging from classical topics in the geometry of convex bodies, to inequalities involving volumes of such bodies or, more generally, log-concave measures, to the study of sections or projections of convex bodies. In many of the papers Probability Theory plays an important role; in some limit laws for measures associated with convex bodies, resembling Central Limit Theorems, are derive and in others probabilistic tools are used extensively. There are also papers on related subjects, including a survey on the behavior of the largest eigenvalue of random matrices and some topics in Number Theory.

  13. Bonneville Power Administration`s Commercial Sector Conservation Market.

    Energy Technology Data Exchange (ETDEWEB)

    Gordan, Frederick M. [Pacific Energy Associates, Inc. (United States)

    1992-11-10

    Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

  14. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  15. A multi-year analysis of passage and survival at McNary Dam, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Walker, C.E.; Perry, R.W.

    2011-01-01

    We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.

  16. National Fire Plan Research and Development 2004-2005 accomplishment report

    Science.gov (United States)

    Michael W. Hilbruner; Paul Keller

    2007-01-01

    This report highlights accomplishments achieved by USDA Forest Service National Fire Plan Research and Development projects from 2004 through 2005 in four key areas: firefighting, rehabilitation and restoration, hazardous fuels reduction, and community assistance. These highlights illustrate the broad range of knowledge and tools introduced and generated by the...

  17. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Dept. of Fish and Wildlife, Portland, OR (USA))

    1989-09-01

    We report on our progress from April 1988 through March 1989 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. Highlights of results of our work in the Dalles and Bonneville reservoirs are: using setlines, we caught 1,586 sturgeon in The Dalles Reservoir and 484 sturgeon in Bonneville Reservoir in 1988. Fork length of fish caught ranged from 34 cm to 274 cm. Of the fish caught we marked 1,248 in The Dalles Reservoir and 341 in Bonneville Reservoir. Of the fish marked in 1988, we recaptured 82 in The Dalles Reservoir and none in Bonneville Reservoir. We recaptured 89 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 35 fish marked in 1988 and 16 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 2 sturgeon marked in 1988 in Bonneville Reservoir. Individual papers were processed separately for the data base.

  18. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    2005-07-01

    The runoff volume for 2004 was below average throughout the Columbia Basin. At The Dalles the January-July runoff volume was 77% of average or 83.0 MAF. Grand Coulee, Hungry Horse, and Libby were below their Biological Opinion reservoir target elevations on April 10 at the beginning of the spring salmon migration season. All major storage reservoirs except Libby, Grand Coulee, Hungry Horse, Dworshak, and Brownlee were within a few feet of full by the end of June and early July. Overall, NOAA Biological Opinion seasonal flow targets were not met at any project for either spring or summer migrations of salmon and steelhead. Overall, spill was reduced in 2004. Implementation of Biological Opinion spill for fish passage measures was wrought with contention in 2004, particularly for summer spill which was finally the subject of litigation. The spring migration spill season began with debate among the fishery mangers and tribes and action agencies regarding spill at Bonneville Dam for the Spring Creek Hatchery release. The USFWS agreed to a spill test versus a corner collector operation to determine the best route for survival for these fish. The USFWS agreement includes no spill for early Spring Creek Hatchery releases for the next two years. Spring spill at Snake River transportation sites was eliminated after April 23, and transportation was maximized. The federal operators and regulators proposed to reduce Biological Opinion summer spill measures, while testing the impact of those reductions. This proposal was eventually rejected in challenges in the Federal Ninth Circuit Court. The Corps of Engineers reported that spill at Bonneville Dam in the 2002 to 2004 period was actually lower than reported due to a spill calibration error at the project. Because flows were low and spill levels were easily controlled few fish were observed with any signs of Gas Bubble Trauma. The annual Smolt Monitoring Program was implemented and provided in-season timing and passage

  19. KURRI progress report 2004. April 2004 - March 2005

    International Nuclear Information System (INIS)

    2005-01-01

    the 3 issues as general researches. This progress report also includes organization, research divisions and laboratories, operation and development of facilities, radiation protection and monitoring, publications from April 2004 to March 2005, meeting, seminars and visiting scientists, and committee members. (J.P.N.)

  20. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  1. Estonie 2004-2005 : y a-t-il un pilote dans l'avion? / Antoine Chalvin

    Index Scriptorium Estoniae

    Chalvin, Antoine

    2005-01-01

    Ülevaade sündmustest Eesti poliitikas ja majanduses: valitsuskoalitsiooni lagunemine, sotsiaalpoliitika ning tervishoiu probleemid, Eesti-Vene piirileping, majandusnäitajad, Eesti-Prantsusmaa suhted, EL-iga liitumise mõjud. Tabelid. Lisad: Eesti poliitiliste sündmuste kronoloogia 2004-2005; Valimistulemused alates 2001; Valitsuse koosseis juunis 2005

  2. Progress report on neutron science. April 1, 2004 - March 31, 2005

    International Nuclear Information System (INIS)

    Kurihara, Kazuo; Moriai, Atsushi; Matsuda, Masaaki

    2005-09-01

    This issue summarizes research progress in neutron science at Japan Atomic Energy Research Institute (JAERI) by utilizing the research reactor JRR-3 during the period between April 1, 2004 and March 31, 2005. This report contains highlights in research by 13 neutron research groups at JAERI and 91 summary articles. (author)

  3. Aylmer Dam : past, present and future; Barrage Aylmer : passe, present et futur

    Energy Technology Data Exchange (ETDEWEB)

    Giguere, H; Lehoux, B; Toma, G [Quebec Ministere du Developpement durable, de l' Environnement et des Parcs, Quebec, PQ (Canada). Centre d' Expertise Hydrique

    2006-07-01

    The Aylmer gravity dam was built in 1953 in Weedon in Quebec's Eastern Townships. The water reservoir retained by the Aylmer Dam has a capacity of 201,928,700 cubic metres and many houses and cottages now line its shores. As such, the water level must be kept high during the summer holiday season. The initial purpose of the dam was for log transportation, the regulation of the Saint-Francois River and the production of electricity. The retention structure belongs to the Quebec government and is managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). Underwater inspection of the dam in 1998 showed signs of erosion damage that required repair. Five of the dam's seven sluices were equipped with stop logs while the others had metallic floodgates. The damage was caused by the preferential use of the 2 floodgates over the years. This paper described the 3 phases for modernizing the evacuation devices of this dam. The first phase began in 2003 with the repair of the dam. The second phase involved the construction of a more modern building in 2004, and the third phase involved the replacement of wooden girders with heated metallic sluices in 2005. The modernization of this dam has reduced the time for required for water evacuation operations during all seasons and has eliminated the danger linked to de-icing techniques. 1 ref., 8 figs.

  4. Summaries of research and development activities by using JAERI computer system in FY2004 (April 1, 2004 - March 31, 2005)

    International Nuclear Information System (INIS)

    2005-08-01

    Center for Promotion of Computational Science and Engineering (CCSE) of Japan Atomic Energy Research Institute (JAERI) installed large computer systems including super-computers in order to support research and development activities in JAERI. CCSE operates and manages the computer system and network system. This report presents usage records of the JAERI computer system and the big users' research and development activities by using the computer system in FY2004 (April 1, 2004 - March 31, 2005). (author)

  5. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  6. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. Clemson University. Sector: Research Institutions

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  7. Atmospheric processes in reaction of Northern Sumatra Earthquake sequence Dec 2004-Apr 2005

    Science.gov (United States)

    Ouzounov, D.; Pulinets, S.; Cervone, G.; Singh, R.; Taylor, P.

    2005-05-01

    This work describes our first results in analyzing data from different and independent sources ûemitted long-wavelength radiation (OLR), surface latent heat flux (SHLF) and GPS Total Electron Content (TEC) collected from ground based (GPS) and satellite TIR (thermal infra-red) data sources (NOAA/AVHRR, MODIS). We found atmosphere and ionosphere anomalies one week prior to both the Sumatra-Andaman Islands earthquake (Dec 26, 2004) and M 8.7 - Northern Sumatra, March 28, 2005. We analyzed 118 days of data from December 1, 2004 through April 1, 2005 for the area (0°-10°,north latitude and 90°-100° east longitude) which included 125 earthquakes with M>5.5. Recent analysis of the continuous OLR from the Earth surface indicates anomalous variations (on top of the atmosphere) prior to a number of medium to large earthquakes. In the case of M 9.0 - Sumatra-Andaman Islands event, compared to the reference fields for the months of December between 2001 and 2004, we found strongly OLR anomalous +80 W/m2 signals (two sigma) along the epicentral area on Dec 21, 2004 five days before the event. In the case of M8.7 March 28, 2005 anomalues signatures over the epicenter appears on March 26 is much weaker (only +20W/m2) and have a different topology. Anomalous values of SHLF associated with M9.0 - Sumatra-Andaman Islands were found on Dec 22, 2005 (SLHF +280Wm2) and less intensity on Mar 23, 2005 (SLHF +180Wm2). Ionospheric variations (GPS/TEC) associated with the Northern Sumatra events were determine by five Regional GPS network stations (COCO, BAKO, NTUS, HYDE and BAST2). For every station time series of the vertical TEC (VTEC) were computed together with correlation with the Dst index. On December 22, four days prior to the M9.0 quake GPS/TEC data reach the monthly maximum for COCO with minor DST activity. For the M 8.7-March 28 event, the increased values of GPS/TEC were observed during four days (March 22-25) in quiet geomagnetic background. Our results need additional

  8. The impact of asthma medication guidelines on asthma controller use and on asthma exacerbation rates comparing 1997-1998 and 2004-2005.

    Science.gov (United States)

    Rank, Matthew A; Liesinger, Juliette T; Ziegenfuss, Jeanette Y; Branda, Megan E; Lim, Kaiser G; Yawn, Barbara P; Shah, Nilay D

    2012-01-01

    The relationship between asthma controller medication use and exacerbation rates over time is unclear at the population level. To estimate the change in asthma controller medication use between 2 time periods as measured by the controller-to-total asthma medication ratio and its association with changes in asthma exacerbation rates between 1997-1998 and 2004-2005. The study design was a cross-sectional population-level comparison between individuals from 1997-1998 and 2004-2005. Study participants were individuals aged 5 to 56 years identified as having asthma in the Medical Expenditure Panel Survey (MEPS). The main outcome measures were a controller-to-total asthma medication ratio greater than 0.5 and asthma exacerbation rates (dispensing of systemic corticosteroid or emergency department visit/hospitalization for asthma) in 1997-1998 compared with 2004-2005. The proportion of individuals with a controller-to-total asthma medication ratio greater than 0.5, when adjusted for other demographic factors, has improved by 16.1% (95% CI: 10.8%, 21.3%) for all individuals from 1997-1998 to 2004-2005. Annual asthma exacerbation rates did not change significantly in any group from 1997-1998 to 2004-2005 (0.27/year to 0.23/year). African American and Hispanic individuals with asthma had higher asthma exacerbation rates and a lower proportion with a controller-to-total asthma medication ratio greater than 0.5 than whites in both 1997-1998 and 2004-2005; however, these differences were not statistically significant. An increase in asthma controller-to-total medication ratio in a sample reflective of the US population was not associated with a decreased asthma exacerbation rate comparing 1997-1998 and 2004-2005. Copyright © 2012 American College of Allergy, Asthma & Immunology. Published by Elsevier Inc. All rights reserved.

  9. Water Power in The Wilderness: The History of Bonneville Lock and Dam

    Science.gov (United States)

    1997-01-01

    yards of material. Reinforced concrete cutoff walls at each abutment and reinforced concrete coun- terfort type upstream wing walls, along with...at the ends of the dam, the abutment Blasting of boulder no. 8 for navigation channel at Cascade Rapids . walls had to be built over 150 feet high...completion of the entire north section during 1936-37, the contractors placed a prefabricated struc- tural steel cofferdam over the crest section

  10. Injury Profile in Women Shotokan Karate Championships in Iran (2004-2005)

    OpenAIRE

    Halabchi, Farzin; Ziaee, Vahid; Lotfian, Sarah

    2007-01-01

    The aims of this paper were to record injury rates among Iranian women competitive Shotokan karate athletes and propose possible predisposing factors. A prospective recording of the injuries resulting from all matches in 6 consecutive women national Shotokan Karate Championships in all age groups in Iran (season 2004-2005) was performed. Data recorded included demographic characteristics (Age and Weight), athletic background (rank, years of experience, time spent training and previous injurie...

  11. Influenza uitbraken in verpleeghuizen 2004-2005: wat zijn de consequenties voor het komende griepseizoen?

    NARCIS (Netherlands)

    Sande, M. van der; Ruijs, H.; Cools, H.; Meijer, A.; Plas, S. van der; Morroy, G.

    2005-01-01

    Voorafgaand aan het influenzaseizoen 2004/2005 verschenen het LCI draaiboek Explosies van luchtweginfecties in instellingen en de NVVA-richtlijn Influenzapreventie in verpleeghuizen en verzorgingshuizen. Beide werden van theoretische commentaren voorzien in onder andere TvT en het Nederlands

  12. Juvenile salmonid monitoring in the White Salmon River, Washington, post-Condit Dam removal, 2016

    Science.gov (United States)

    Jezorek, Ian G.; Hardiman, Jill M.

    2017-06-23

    Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and removed completely in 2012, allowing anadromous salmonids access to habitat that had been blocked for nearly 100 years. A multi-agency workgroup concluded that the preferred salmonid restoration alternative was natural recolonization with monitoring to assess efficacy, followed by a management evaluation 5 years after dam removal. Limited monitoring of salmon and steelhead spawning has occurred since 2011, but no monitoring of juveniles occurred until 2016. During 2016, we operated a rotary screw trap at river kilometer 2.3 (3 kilometers downstream of the former dam site) from late March through May and used backpack electrofishing during summer to assess juvenile salmonid distribution and abundance. The screw trap captured primarily steelhead (Oncorhynchus mykiss; smolts, parr, and fry) and coho salmon (O. kisutch; smolts and fry). We estimated the number of steelhead smolts at 3,851 (standard error = 1,454) and coho smolts at 1,093 (standard error = 412). In this document, we refer to O. mykiss caught at the screw trap as steelhead because they were actively migrating, but because we did not know migratory status of O. mykiss caught in electrofishing surveys, we simply refer to them as O. mykiss or steelhead/rainbow trout. Steelhead and coho smolts tagged with passive integrated transponder tags were subsequently detected downstream at Bonneville Dam on the Columbia River. Few Chinook salmon (O. tshawytscha) fry were captured, possibly as a result of trap location or effects of a December 2015 flood. Sampling in Mill, Buck, and Rattlesnake Creeks (all upstream of the former dam site) showed that juvenile coho were present in Mill and Buck Creeks, suggesting spawning had occurred there. We compared O. mykiss abundance data in sites on Buck and Rattlesnake Creeks to pre-dam removal data. During 2016, age-0 O. mykiss were more abundant in Buck Creek than in 2009 or

  13. Tricomoníase: prevalência no gênero feminino em Sergipe no biênio 2004-2005 Trichomoniasis: prevalence in the female gender in 2004-2005 in Sergipe State, Brazil

    Directory of Open Access Journals (Sweden)

    Mayra Santos Almeida

    2010-06-01

    Full Text Available A tricomoníase é uma protozoose causada pelo Trichomonas vaginalis, que desencadeia uma ampla variedade de manifestações clínicas, podendo estar associada à transmissão do vírus da imunodeficiência humana, câncer cervical, infertilidade, entre outros. No Brasil, a incidência varia entre 20 e 40%. A via primária de transmissão é pelo contato sexual e o diagnóstico laboratorial pode ser realizado através da Reação de Polimerase em Cadeia (PCR, isolamento em meios de cultura e exame do conteúdo vaginal à fresco e/ou corados pelos métodos de Giemsa e Papanicolau. Esse último possui limitações na detecção de patologias consideradas DST, a exemplo da tricomoníase. Esse artigo trata da prevalência de tricomoníase em mulheres usuárias dos laboratórios conveniados ao Ministério da Saúde, na faixa etária de 19 a 44 anos, que foram submetidas ao teste de Papanicolau, em 2004-2005, no Estado de Sergipe. Os resultados revelaram que, em 206.034 usuárias, 7.349 apresentaram tricomoníase, sendo que 3.788 em 2004 e 3.498 em 2005. Observou-se que a prevalência estimada em Sergipe, no biênio estudado, não corrobora com a realidade brasileira, fato esse que pode estar atrelado ao diagnóstico executado.Trichomoniasis is a disease caused by the protozoan Trichomonas vaginalis, which initiates a wide variety of clinical manifestations. It may be associated with human immunodeficiency virus, cervical cancer, infertility and other diseases. Its incidence ranges from 20% up to 40% in Brazil. The primary channel of transmission is by sexual contact and laboratorial diagnostic may be performed by chain polymerase reaction (CPR, culture medium isolation, fresh vaginal content exam and/or colored by Giemsa and Papanicolau methods. The later has limitations in the detection of pathologies considered sexually transmissible, like Thricomoniasis. This work deals with prevalence of Thricomoniasis in users of laboratories associated with the

  14. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  15. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  16. Severe maternal morbidity for 2004-2005 in the three Dublin maternity hospitals.

    LENUS (Irish Health Repository)

    Murphy, Cliona M

    2012-02-01

    OBJECTIVE: To assess the prevalence and causes of severe maternal morbidity in Dublin over a two year period from 2004 to 2005. STUDY DESIGN: A prospective cohort study from January 2004 to December 2005 was undertaken in the three large maternity hospitals in Dublin, which serve a population of 1.5 million people. All are tertiary referral centres for obstetrics and neonatology and have an annual combined delivery rate of circa 23,000 births. Cases of severe maternal morbidity were identified. A systems based classification was used. The primary cause of maternal morbidity and the number of events experienced per patient was recorded. RESULTS: We identified 158 women who fulfilled the definition for severe maternal morbidity, giving a rate of 3.2 per 1000 maternities. There were two maternal deaths during the time period giving mortality to morbidity ratio of 1:79. The commonest cause of severe morbidity was vascular dysfunction related to obstetric haemorrhage. Eclampsia comprised 15.4% of cases. Intensive care or coronary care admission occurred in 12% of cases. CONCLUSION: The prevalence of severe maternal morbidity in this population is 3.2\\/1000 maternities. Obstetric haemorrhage was the main cause of severe maternal morbidity.

  17. Proceedings of the Canadian Dam Association's 2005 annual conference : 100 years of dam experience : balancing tradition and innovation. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-09-01

    This conference provided a forum to promote discussion on improving the management and safety of dams. It featured 8 technical sessions as well as workshops to discuss dam safety guidelines and guidelines for extreme flood analyses and their applications. It also featured workshops on instrumentation and performance monitoring of dams; tailing dam closures and reclamation; and, practical approaches to emergency preparedness for dam owners. The discussions provided details on large hydropower development projects, their innovations in environmental impact assessment, mitigation, and monitoring. The conference included a technical component led by experts on dams and tailings facilities. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and safety guidelines. All 24 presentations at this conference have been catalogued separately for inclusion in this database

  18. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. The Citadel. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  19. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. Lander University. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  20. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. Winthrop University. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  1. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. Medical University of South Carolina. Sector: Research Institutions

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  2. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. University of South Carolina Columbia. Sector: Research Institutions

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  3. The SPEAR3 Vacuum System - An Analysis of the First Two Years of Operation (2004 and 2005)

    International Nuclear Information System (INIS)

    Armenta, R.

    2005-01-01

    SPEAR 3, a synchrotron radiation source at the Stanford Linear Accelerator Center, has been in operation for the past two years. SPEAR 3 was designed to achieve high beam lifetimes while operating at a higher current level than previously achieved with SPEAR 2. Maintaining high electron beam lifetimes within the ring allows users to perform their experiments with a consistent supply of high current synchrotron radiation. The purpose of this analysis is to evaluate the SPEAR 3 vacuum system's performance during the 2004 and 2005 runs while considering methods to optimize and improve vacuum system conditioning, especially within the pumping system, so that a recommended plan of action can be created for the FY 2006 run. Monitoring the dynamics of the electron beam within the ring can be a difficult task. Pressure data obtained from the gages attached to pumps, temperature data obtained from thermocouples located at various locations around the ring, and beam lifetime projections help to provide some indication of the health of the electron beam, but the true conditions within the beam chamber can only be extrapolated. Data collected from sensors (gauges, thermocouples, etc.) located around the ring can be viewed and extracted from a program created at the Stanford Synchrotron Radiation Laboratory (SSRL) called Historyplot. Manipulation and analysis of data was performed with the commercially available programs Matlab and Excel. The data showed that the beam lifetimes in 2005 were much greater than they were in 2004, but it did not provide a clear indication as to why this occurred. One variable of major importance between the 2004 and 2005 runs is the Titanium Sublimation Pump (TSP) flash frequency (flashing is the process in which Titanium from filaments within the pump is sublimated onto the wall surfaces of the pump, where it removes gas molecules from the system by chemisorption). The data indicated that pressures in 2005 could have been lower, based on a

  4. Lower Granite dam smolt monitoring program: annual report, 2000; ANNUAL

    International Nuclear Information System (INIS)

    Morrill, Charles

    2000-01-01

    The 2000 fish collection season at Lower Granite was characterized by lower than average spring flows and spill, low levels of debris, cool water temperatures, increased unclipped yearling and subyearling chinook smolts, and 8,300,546 smolts collected and transported compared to 5,882,872 in 1999. With the continued release of unclipped supplementation chinook and steelhead above Lower Granite Dam, we can no longer accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. Although some table titles in this report still show ''wild'' column headings, the numbers in these columns for 1999 and 2000 include wild and unclipped hatchery origin smolts. The increases over previous years reflect the increased supplementation. A total of 8,300,546 juvenile salmonids were collected at Lower Granite Dam. Of these, 187,862 fish were bypassed back to the river and 7,950,648 were transported to release sites below Bonneville Dam, 7,778,853 by barge and 171,795 by truck. A total of 151,344 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 1,361,006 smolts (16.4% of the total collection)

  5. Energy law - Actual problems 2004/2005; Energierecht - Aktuelle Probleme 2004/2005

    Energy Technology Data Exchange (ETDEWEB)

    Schwintowski, H.P. (ed.)

    2006-07-01

    The book under consideration contains contributions to current problems in the range of energy law which have led to intensive discussions in the years 2005 and 2006. These contributions consider franchise agreements, energy contracting, regional subset distribution systems and long-term supply contracts.

  6. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  7. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. Francis Marion University. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  8. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. College of Charleston. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  9. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. Coastal Carolina University. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  10. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    International Nuclear Information System (INIS)

    Englin, J.E.; Gygi, K.F.

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs

  11. Olympic dam expansion - a clear future for uranium

    International Nuclear Information System (INIS)

    Hunt, G.

    2008-01-01

    After BHP Billiton's acquisition of Olympic Dam in northern South Australia in 2005, an important early decision was to undertake a major drilling campaign to better define the resource. Between 2005 and 2007, the drilling almost doubled the resource. BHP Billiton's 2007 annual report indicated the Olympic Dam mineral resource estimate is 7.855 B dry metric tonnes at metal grades of 0.86% Copper, 0.29 kg per tonne Uranium Oxide, 0.3 g/t Gold and 1.6 g/t Silver.

  12. System-Wide Significance of Predation on Juvenile Salmonids in Columbia and Snake River Reservoirs : Annual Report 1992.

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, James H.; Poe, Thomas P.

    1993-12-01

    Northern squawfish (Ptychocheilus oregonensis) predation on juvenile salmonids was characterized during 1992 at ten locations in the Columbia River below Bonneville Dam and at three locations in John Day Reservoir. During the spring and summer, 1,487 northern squawfish were collected in the lower Columbia River and 202 squawfish were sampled in John Day Reservoir. Gut content data, predator weight, and water temperature were used to compute a consumption index (CI) for northern squawfish, and overall diet was also described. In the Columbia River below Bonneville Dam, northern squawfish diet was primarily fish (spring 69%; summer 53%), most of which were salmonids. Salmonids were also the primary diet component in the Bonneville Dam tailrace, John Day Dam forebay, and the McNary Dam tailrace. Crustaceans were the dominant diet item at the John Day mid-reservoir location, although sample sizes were small. About half of the non-salmonid preyfish were sculpins. The consumption index (CI) of northern squawfish was generally higher during summer than during spring. The highest CI`s were observed during summer in the tailrace boat restricted zones of Bonneville Dam (CI = 7.8) and McNary Dam (CI = 4.6). At locations below Bonneville Dam, CI`s were relatively low near Covert`s Landing and Rooster Rock, higher at four locations between Blue Lake and St. Helens, and low again at three downriver sites (Kalama, Ranier, and Jones Beach). Northern squawfish catches and CI`s were noticeably higher throughout the lower Columbia compared to mid-reservoir sites further upriver sampled during 1990--92. Predation may be especially intense in the free-flowing section of the Columbia River below Bonneville Dam. Smallmouth bass (Micropterus dolomieui; N = 198) ate mostly fish -- 25% salmonids, 29% sculpins, and 46% other fish. Highest catches of smallmouth bass were in the John Day Dam forebay.

  13. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

    2004-02-01

    We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  14. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2003-12-01

    We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  15. Washington Phase II Fish Diversion Screen Evaluations in the Yakima River Basin, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Vucelick, Jessica; McMichael, Geoffrey; Chamness, Mickie [Pacific Northwest National Laboratory

    2006-02-01

    In 2004, the Pacific Northwest National Laboratory (PNNL) evaluated 25 Phase II fish screen sites in the Yakima River Basin as part of a multi-year project for the Bonneville Power Administration on the effectiveness of fish screening devices. PNNL collected data to determine whether velocities in front of the screens and in the bypasses met the National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries, formerly the National Marine Fisheries Service (NMFS)) criteria to promote safe and timely fish passage. In addition, PNNL conducted underwater video surveys to evaluate the environmental and operational conditions of the screen sites with respect to fish passage. Based on evaluations in 2004, PNNL concluded that: (1) In general, water velocity conditions at the screen sites met fish passage criteria set by NOAA Fisheries. (2) Conditions at most facilities would be expected to provide for safe juvenile fish passage. (3) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well-greased and operative. (4) Removal of sediment buildup and accumulated leafy and woody debris could be improved at some sites. (5) Conditions at some facilities indicate that operation and/or maintenance should be modified to improve passage conditions for juvenile fish. For example, Taylor has had problems meeting bypass flow and submergence operating criteria since the main river channel shifted away from the site 2 years ago, and Fruitvale consistently has had problems meeting bypass flow criteria when the water is low. (6) Continued problems at Gleed point to design flaws. This site should be considered for redesign or replacement.

  16. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    International Nuclear Information System (INIS)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes)

  17. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

  18. Bonneville Power Administration 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  19. The December 2004-January 2005 floods in the Garden Route region of the Southern Cape, South Africa

    Directory of Open Access Journals (Sweden)

    Johan Tempelhoff

    2009-04-01

    Full Text Available The December 2004-January 2005 floods in the Garden Route region of the Southern Cape in South Africa have had a significant impact on local development and economic activities, tourism products andlocal institutions. This article aims to capture the dynamism between a number of related fields within the context of transdisciplinary research. Qualitative research methods were used to target a representative sample of the affected population. This article considers the history of the flooding events of December 2004/January 2005 along the Garden Route, as well as the manner in which emergency/disaster management personnel responded to the crisis. The effect of the floods on the tourism sector along the Garden Route was researched in general and the effects of the floods on tourists, local residents, and particularly communities in disadvantaged areas were specifically determined. The research reflects on the disaster risk management strategies that were in place at the time of the floods to determine what local authorities could have done to cope with the potential conditions of crisis. The research found that although some tourism products were severely affected, the 2004/2005 floods did not have a significant impact on the number of tourists frequenting the area. In terms of disaster risk management, concerns remain regarding the lack of the following factors: capacity, adequate early warning systems, proper infrastructure maintenance, local institutions, and an in-depth understanding of the disaster risk profile of the area.

  20. [Evolution of food supply (apart from school catering) between 2004/2005 and 2009/2010 in middle- and high-schools of Aquitaine, France].

    Science.gov (United States)

    Langevin, C; Carriere, C; Delmas, C; Péchaud, M; Barberger-Gateau, P; Maurice, S; Thibault, H

    2013-02-01

    The aim of this study was to assess the evolution of food supply (apart from school catering) between school years 2004/2005 and 2009/2010, in middle- and high-schools from the Aquitaine region (southwest France), in order to evaluate the impact of actions conducted within the framework and the program Nutrition, Prevention and Health of children and adolescents in Aquitaine (southwest France). Two surveys were carried out among all middle- and high-schools of the Aquitaine region in 2004/2005 (n=536) and 2009/2010 (n=539) within the framework of a regional multidisciplinary public health program "Nutrition, prevention and health of children and teenagers in Aquitaine". For both 2004/2005 and 2009/2010, data were collected using the same questionnaire and dealt with school characteristics and modalities of food supply (apart from school catering). Response rate was 84.1% in 2004/2005 and 79.6% in 2009/2010. The proportion of schools offering food to pupils (apart from school catering) significantly decreased in 5 years (from 80.1% to 50.1%, Pcatering) has also been improved: less sweet and fat food, more bread and fruits. This study shows an overall improvement of food supply apart from school catering (food sale, free food and vending machines) in middle- and high-schools from the Aquitaine region (southwest France) between 2004/2005 and 2009/2010. This improvement is related to the proportion of schools offering food (quantitative improvement), as well as to the composition of food supply (qualitative improvement). These results show an improvement of food supply (apart from school catering), suggesting that actions implemented in the framework of the program "Nutrition, prevention and health of children and adolescents in Aquitaine" may have led to these improvements. Copyright © 2012 Elsevier Masson SAS. All rights reserved.

  1. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. South Carolina State University. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  2. Report: Audit of Financial Statements As of and for the Years Ended September 30, 2005 and 2004

    Science.gov (United States)

    Report #2006-1-00080, September 28, 2006. CSB's financial statements, as of and for the years ended September 30, 2005 and 2004, are presented fairly, in all material respects, in conformity with accounting principles generally accepted in the USA.

  3. Characterizing the Fish Passage Environment at The Dalles Dam Spillway: 2001-2004

    Energy Technology Data Exchange (ETDEWEB)

    Richmond, Marshall C.; Carlson, Thomas J.; Serkowski, John A.; Cook, Chris B.; Duncan, Joanne P.; Perkins, William A.

    2007-10-10

    The spill environment at The Dalles Dam in 2001-2004 was characterized using a field-deployed autonomous sensor (the so-called Sensor Fish), computational fluid dynamics (CFD) modeling, and Lagrangian particle tracking. The sensor fish has a self-contained capability to digitally the record pressure and triaxial accelerations it was exposed to following its release into the spillway. After recovery downstream of the tailrace, the data stored in the memory of the sensor are downloaded and stored for analysis. The spillway, stilling basin, and tailrace hydrodynamics were simulated using an unsteady, free-surface, three-dimensional CFD code that solved the Reynolds-averaged Navier-Stokes equations in conjunction with a two-equation turbulence model. The results from the CFD simulations were then used in a Lagrangian particle tracking model that included the effects of mass, drag, and buoyancy in the particle equation of motion. A random walk method was used to simulate the effects of small-scale turbulence on the particle motion. Several operational and structural conditions were evaluated using the Sensor Fish, CFD, and particle tracking. Quantifying events such as strike and stilling basin retention time characterized exposure conditions in the spill environment.

  4. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. University of South Carolina Upstate. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  5. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. University of South Carolina Aiken. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  6. 2004-05 Performance Year Ratings Impacting Fiscal Year 2005-06. University of South Carolina Beaufort. Sector: Four-Year Colleges and Universities

    Science.gov (United States)

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    This series of documents contains performance scoring information for 2004-2005 for individual institutions of higher education in South Carolina. This information is used in establishing 2005-2006 fiscal year allocations. Data includes: (1) Degrees Awarded; (2) Enrollment; (3) Average SAT score; (4) Faculty; (5) Tuition; and (6) Financial…

  7. Ground source heat pump retrofit at North Bonneville, WA City Hall

    Energy Technology Data Exchange (ETDEWEB)

    Hughey, M. [Skamania Co. PUD No. 1, Carson, WA (United States)

    1997-12-31

    In 1995, the City of North Bonneville, WA installed a 10-ton Ground Source Heat Pump (GSHP) to replace the electric resistance furnace in its 4,000 square, foot City Hall. North Bonneville is 30 miles east of Portland, Oregon, at river level in the Columbia River Gorge. Funded jointly by the Bonneville Power Administration, the State of Washington and the City, this project has successfully reduced the heating cost of City Hall by nearly one-half while dramatically increasing comfort. It has become a commercial model in the Pacific Northwest for assessing values of commercial GSHP retrofits. This interim report compares estimated savings with actual experience for the first operating year. Projected savings were $1,500; actual savings were $1,390 prior to adjustment for extreme weather. Adjusted savings for Heating Year 1996 were $1,490, a 47 percent decrease. Maintenance savings (not itemized) were in addition to this amount. Monitoring continues in 1997.

  8. Grain-size evolution in suspended sediment and deposits from the 2004 and 2008 controlled-flood experiments in Marble and Grand Canyons, Arizona

    Science.gov (United States)

    Draut, Amy E.; Topping, David J.; Rubin, David M.; Wright, Scott A.; Schmidt, John C.

    2010-01-01

    Since the closure of Glen Canyon Dam in 1963, the hydrology, sediment supply, and distribution and size of modern alluvial deposits in the Colorado River through Grand Canyon have changed substantially (e.g., Howard and Dolan, 1981; Johnson and Carothers, 1987; Webb et al., 1999; Rubin et al., 2002; Topping et al., 2000, 2003; Wright et al., 2005; Hazel et al., 2006). The dam has reduced the fluvial sediment supply at the upstream boundary of Grand Canyon National Park by about 95 percent. Regulation of river discharge by dam operations has important implications for the storage and redistribution of sediment in the Colorado River corridor. In the absence of natural floods, sediment is not deposited at elevations that regularly received sediment before dam closure. There has been a systemwide decrease in the size and number of subaerially exposed fluvial sand deposits since the 1960s, punctuated by episodic aggradation during the exceptional high-flow intervals in the early 1980s and by sediment input from occasional tributary floods (Beus and others, 1985; Schmidt and Graf, 1990; Kearsley et al., 1994; Schmidt et al., 2004; Wright et al., 2005; Hazel et al., 2006). Fluvial sandbars are an important component of riparian ecology that, among other functions, enclose eddy backwaters that form native-fish habitat, provide a source for eolian sand that protects some archaeological sites, and are used as campsites by thousands of river-runners annually (Rubin et al., 1990; Kearsley et al., 1994; Neal et al., 2000; Wright et al., 2005; Draut and Rubin, 2008).

  9. Stagnation in body mass index in Denmark from 1997/1998 to 2004/2005, but with geographical diversity

    DEFF Research Database (Denmark)

    Svendstrup, Mathilde; Knudsen, Nils Jacob; Jørgensen, Torben

    2011-01-01

    INTRODUCTION: We analyzed the trend in body mass index (BMI) as well as in the prevalence of overweight and obesity among Danish adults, mainly women, from 1997/1998 to 2004/2005 and evaluated any regional differences. MATERIAL AND METHODS: Data were drawn from two cross-sectional population...

  10. Computational fluid dynamics simulations of the Late Pleistocene Lake Bonneville flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-01-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s−1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y−1 Pa−1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the

  11. Computational Fluid Dynamics simulations of the Late Pleistocene Lake Bonneville Flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-06-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s-1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y-1 Pa-1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the outflow to grow from 10

  12. Fish ladder of Lajeado Dam: migrations on one-way routes?

    Directory of Open Access Journals (Sweden)

    Angelo Antônio Agostinho

    Full Text Available Fish ladders are generally conceived to reestablish connectivity among critical habitats for migratory species, thus mitigating the impacts of the blockage of migration routes by dams. If this management tool is to be meaningful for conserving fish species, it must provide a fully permeable connection and assure both upward and downward movements. However, because reservoirs have very different hydrodynamics than the original river, it is expected that, at least in the inner area, they may constitute an additional barrier to this movement, especially for descending fish. Thus, the present study sought to determine if migratory fish and their offspring disperse downstream from the dam after ascending a ladder and spawning in the upper reaches of a basin. To achieve this purpose, we evaluated the limitation imposed by lentic areas to the descent of eggs, larvae and adults of migratory species; we also determined the abundance and composition of larvae present in the plankton near the dam, and compared the intensity of the upward and downward movements of adult fish. Samples of ichthyoplankton were taken upriver, inside the reservoir, in the river downstream from the dam, and in the forebay of the Lajeado Dam on the Tocantins River (Luis Eduardo Magalhães Hydroelectric Plant, from October, 1999 through September, 2004. The densities of fish ascending and descending the ladder were determined experimentally on eight occasions, from June, 2004 to March, 2005. Due to difficulties in identifying the true fish origin (up or down in the environments connected by the fish passage system, the evaluation of the distribution of migratory fish in reservoirs was based on the landings of the commercial fishery conducted along the Itaipu Reservoir during the four years preceding (2001 through 2003 the construction of the lateral channel (fish-passage mechanism. Fish eggs and larvae drifting down the Tocantins River did not appear in samples taken in the lower

  13. A study to analyze IAEA planning of 2004-2005 programme and to establish cooperation directions with the IAEA

    International Nuclear Information System (INIS)

    Oh, K. B.; Lee, K. S.; Lee, B. W.; Ko, H. S.; Ryu, J. S.; Lee, T. J.; Kim, M. R.

    2003-07-01

    The objective of this study is to utilize the IAEA effectively through reflecting Korea's opinion fully for the planning of the Agency's 20042005 Programme. This study first analyzed the current status of the IAEA Programme and Budget and reviewed the issues relevant to Korea. Second, this study assessed the IAEA 20042005 Programme and drew up Korea's opinion for it. The official document including the opinions was submitted to the Secretariat. In reviewing the Programme, this study considered the strengths of Korea related to the Programme. Also some projects and CRPs, which can be lead by Korea, were proposed. The IAEA 20042005 Programme reflected well the technical and social changes and its structure seems to be proper. The budget was proposed to be increased over 10%, violating the zero-real growth principle. This seems to be inevitable considering the increase of safeguards activities. However, there should be prepared some measures to avoid rapid increase of the burdens of the Member States. In the process of the planning of the IAEA 20042005 Programme, the following points should be emphasized. First, SMR activities should be given a high priority considering the high interests of developing countries and be set up as a separate project as in the 2002∼2003 Programme. Second, more budget should be allocated for Project A.4.04(Support for demonstration of nuclear seawater desalination), considering the highest priority of the project in Program A. Third, it's better to change the title of Subprogram C.3 to 'Nuclear knowledge Preservation' to stick to the original rationale of the subprogram. There is a need for further activities such as establishing and implementing the concept of international nuclear school based on the result of the feasibility study done in 2002∼2003. Fourth, further activities needs to be added to the Project D.2.03 for the efficient conversion to high density, low enriched uranium in Member States; for instance, review

  14. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat

  15. Piimatootmine : [1999-2004 Eestis] / Matti Piirsalu

    Index Scriptorium Estoniae

    Piirsalu, Matti, 1947-

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 11-13. Põllumajanduse kogutoodangust moodustas piimatootmine 2004. a. hinnanguliselt 29%. Diagrammid

  16. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Science.gov (United States)

    2013-07-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ13-10-000] United States Department of Energy; Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice... (OATT) and a Petition for Declaratory Order requesting the Commission find that Bonneville's OATT, as...

  17. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    dam and the methods of monitoring techniques applied by various disciplines. Some results have been obtained from this method for nearly eight years are presented in this work. In addition, the results of bathymetric surveys between 2005 and 2010 will be compared using the cross sections where the maximum changes occurred on the dam bottom of the reservoir area.

  18. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  19. A study to analyze IAEA planning of 2004-2005 programme and to establish cooperation directions with the IAEA

    Energy Technology Data Exchange (ETDEWEB)

    Oh, K. B.; Lee, K. S.; Lee, B. W.; Ko, H. S.; Ryu, J. S.; Lee, T. J.; Kim, M. R

    2003-07-01

    The objective of this study is to utilize the IAEA effectively through reflecting Korea's opinion fully for the planning of the Agency's 2004{approx}2005 Programme. This study first analyzed the current status of the IAEA Programme and Budget and reviewed the issues relevant to Korea. Second, this study assessed the IAEA 2004{approx}2005 Programme and drew up Korea's opinion for it. The official document including the opinions was submitted to the Secretariat. In reviewing the Programme, this study considered the strengths of Korea related to the Programme. Also some projects and CRPs, which can be lead by Korea, were proposed. The IAEA 2004{approx}2005 Programme reflected well the technical and social changes and its structure seems to be proper. The budget was proposed to be increased over 10%, violating the zero-real growth principle. This seems to be inevitable considering the increase of safeguards activities. However, there should be prepared some measures to avoid rapid increase of the burdens of the Member States. In the process of the planning of the IAEA 2004{approx}2005 Programme, the following points should be emphasized. First, SMR activities should be given a high priority considering the high interests of developing countries and be set up as a separate project as in the 2002{approx}2003 Programme. Second, more budget should be allocated for Project A.4.04(Support for demonstration of nuclear seawater desalination), considering the highest priority of the project in Program A. Third, it's better to change the title of Subprogram C.3 to 'Nuclear knowledge Preservation' to stick to the original rationale of the subprogram. There is a need for further activities such as establishing and implementing the concept of international nuclear school based on the result of the feasibility study done in 2002{approx}2003. Fourth, further activities needs to be added to the Project D.2.03 for the efficient conversion to high density

  20. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

    2005-11-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The

  1. Antimicrobial resistence of Shigella species isolated during 2004 and 2005 from selected sites in Zimbabwe.

    Science.gov (United States)

    Ndlovu, N; Tarupiwa, A; Mudzori, J T

    2006-01-01

    To determine the predominant serotype and antibiotic sensitivity pattern of Shigella isolates during 2004 and 2005 in Zimbabwe. Cross sectional study. National Microbiology Reference Laboratory (NMRL), Harare, Zimbabwe. 259 clinical isolates of Shigella species isolated during 2004 and 2005 in Zimbabwe were studied. These samples had been referred to the NMRL for further testing. Serotype and antibiotic sensitivity pattern of Shigella species. Of the 259 clinical isolates of Shigella tested the following species were serotyped; 141 (54.4%) were S. flexneri; 70 (27%) S. sonnei; 38 (14.7%) S. dysenteriae and 10 (3.9%) S. boydii. About 4% of all Shigella isolates tested showed full sensitivity to commonly used antibiotics, 20.8% were resistant to one antibiotic only while 75.3% were resistant to at least two antibiotics. The most common resistance among Shigella species was to cotrimoxazole (89%), tetracycline (73%), ampicillin (49%) and chloramphenicol (41%). High susceptibility among Shigella species was observed to nalidixic acid (86%), ciprofloxacin (99%) and ceftazidine (99%). There was a low drug resistance of Shigella species to nalidixic acid, a drug of choice in Zimbabwe, except among Shigella dysenteriae type 1 strains. Continuous monitoring of the susceptibility patterns of Shigella species is important in order to detect the emergence of drug resistance and to update guidelines for antibiotic treatment in shigellosis.

  2. Brood Year 2004: Johnson Creek Chinook Salmon Supplementation Report, June 2004 through March 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Gebhards, John S.; Hill, Robert; Daniel, Mitch [Nez Perce Tribe

    2009-02-19

    The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River spring/summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek to spawn through artificial propagation. This was the sixth season of adult chinook broodstock collection in Johnson Creek following collections in 1998, 2000, 2001, 2002, and 2003. Weir installation was completed on June 21, 2004 with the first chinook captured on June 22, 2004 and the last fish captured on September 6, 2004. The weir was removed on September 18, 2004. A total of 338 adult chinook, including jacks, were captured during the season. Of these, 211 were of natural origin, 111 were hatchery origin Johnson Creek supplementation fish, and 16 were adipose fin clipped fish from other hatchery operations and therefore strays into Johnson Creek. Over the course of the run, 57 natural origin Johnson Creek adult chinook were retained for broodstock, transported to the South Fork Salmon River adult holding and spawning facility and held until spawned. The remaining natural origin Johnson Creek fish along with all the Johnson Creek supplementation fish were released upstream of the weir to spawn naturally. Twenty-seven Johnson Creek females were artificially spawned with 25 Johnson Creek males. Four females were diagnosed with high bacterial kidney disease levels resulting in their eggs being culled. The 27 females produced 116,598 green eggs, 16,531 green eggs were culled, with an average eye-up rate of 90.6% resulting in 90,647 eyed eggs. Juvenile fish were reared indoors at the McCall Fish Hatchery until November 2005 and then transferred to the outdoor rearing facilities during the Visual Implant Elastomer tagging operation

  3. 77 FR 15096 - Bonneville Power Administration; Notice of Compliance Filing

    Science.gov (United States)

    2012-03-14

    ... Commission's Order.\\1\\ \\1\\ Iberdrola Renewables, Inc. v. Bonneville Power Admin., 137 FERC ] 61,185 (2011... the Web site that enables subscribers to receive email notification when a document is added to a...

  4. Maaturism : [2004 Eestis] / Kristine Hindriks

    Index Scriptorium Estoniae

    Hindriks, Kristine

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 106-109. Tunnustatud maamajutusettevõtteid oli 2004. a. 546 ehk 10% enam kui möödunud aastal, neist kodumajutus ja puhkemajad moodustavad 55%, puhkekülad ning külalistemajad 29%, hostelid, hotellid, motellid kokku 16%. Diagrammid

  5. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study; FINAL

    International Nuclear Information System (INIS)

    Cook, Chris B; Richmond, Marshall C; Guensch, Greg

    2001-01-01

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating

  6. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  7. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1996. Annual report

    International Nuclear Information System (INIS)

    Smith, S.G.; Muir, W.D.; Hockersmith, E.E.; Achord, S.; Eppard, M.B.; Ruehle, T.E.; Williams, J.G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature

  8. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature.

  9. Phytoplankton composition of Sazlidere Dam lake, Istanbul, Turkey

    Directory of Open Access Journals (Sweden)

    Nese Yilmaz

    2013-05-01

    Full Text Available The phytoplankton composition of Sazlidere Dam lake was studied at 5 sampling sites between December 2003 - November 2005. A total of 67 taxa were recorded, representing Bacillariophyta (31, Chlorophyta (18, Cyanophyta (9, Chrysophyta (1, Cryptophyta (1, Dinophyta (3 and Euglenophyta (4. Bacillariophyta members constituted the dominant phytoplankton group in terms of species number. Nygaard’s compound index value and composition of phytoplankton indicate that the trophic state of Sazlidere Dam lake was changing from oligotrophic to mesotrophic.

  10. Feeding biology of the introduced fish roi, and its impact on Hawaiian reef fishes, January 2004 and January 2005, (NODC Accession 0002172)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Feeding biology of the introduced fish roi (Cephalopholis argus), and its impact on Hawaiian reef fishes and fisheries between January 2004 and January 2005. Roi...

  11. Pacific Lamprey Research and Restoration : Annual Report 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

    1998-08-05

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

  12. Internet cigarette purchasing among 9th grade students in western New York: 2000-2001 vs. 2004-2005.

    Science.gov (United States)

    Fix, Brian V; Zambon, Margaret; Higbee, Cheryl; Cummings, K Michael; Alford, Terry; Hyland, Andrew

    2006-09-01

    To assess trends and correlates of youth cigarette purchasing behavior on the Internet. In 2000-2001, Roswell Park Cancer Institute conducted a survey asking 7,019 ninth grade students in Erie and Niagara Counties in New York State about their tobacco use and purchasing habits, including use of the Internet to buy cigarettes. The 2004-2005 survey is a replication of the 2000-2001 survey. Both surveys used an anonymous, self-administered questionnaire survey. These data were combined in order to examine trends in youth smoking behavior. Students surveyed in 2004-2005 were 2.6 times more likely (95% CI: 1.5, 4.6) to have purchased cigarettes over the Internet in the 30 days prior to the survey than those surveyed in 2001 (5.2% to 1.6%); however, the intention to use the Internet as a cigarette source in the future did not change between survey periods. Youth online cigarette purchasing has increased but intention to use the Internet to purchase cigarettes in the future has remained the same, suggesting that this trend may be reaching a plateau. Recent public efforts to reduce online cigarette sales will need to be evaluated in order to determine which policy or combination of policies are most effective.

  13. Alkoholi tootmine ja turg : [2002-2004] / Katrin Karolin

    Index Scriptorium Estoniae

    Karolin, Katrin

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 45-47. 2004. a. 9 kuu alkoholi jaekäive ulatus 2,2 mld kroonini, mis on 13% suurem kui eelmise aasta samal perioodil. Tabelid: Alkohoolsete jookide tootmine Eestis (9 kuud 2002-2004); Alkoholi tarbimine elanike hinnangute alusel

  14. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kern, J. Chris; Ward, David L.; Farr, Ruth A. (Oregon Department of Fish and Wildlife)

    2002-02-01

    We report on our progress from April 2000 through March 2001 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), the U.S. Fish and Wildlife Service (USFWS; Report E), and Oregon State University (OSU; Report F). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 2000 through March 2001 are listed.

  15. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam, 1999-2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    2001-04-01

    We report on our progress from April 1999 through March 2000 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), and the U.S. Fish and Wildlife Service (USFWS; Report E). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1999 through March 2000 are given.

  16. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 1998-1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.

    2000-12-01

    The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia River Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.

  17. Coseismic and post-seismic signatures of the Sumatra 2004 December and 2005 March earthquakes in GRACE satellite gravity

    Science.gov (United States)

    Panet, I.; Mikhailov, V.; Diament, M.; Pollitz, F.; King, G.; de Viron, O.; Holschneider, M.; Biancale, R.; Lemoine, J.-M.

    2007-01-01

    The GRACE satellite mission has been measuring the Earth's gravity field and its temporal variations since 2002 April. Although these variations are mainly due to mass transfer within the geofluid envelops, they also result from mass displacements associated with phenomena including glacial isostatic adjustment and earthquakes. However, these last contributions are difficult to isolate because of the presence of noise and of geofluid signals, and because of GRACE's coarse spatial resolution (>400 km half-wavelength). In this paper, we show that a wavelet analysis on the sphere helps to retrieve earthquake signatures from GRACE geoid products. Using a wavelet analysis of GRACE geoids products, we show that the geoid variations caused by the 2004 December (Mw = 9.2) and 2005 March (Mw = 8.7) Sumatra earthquakes can be detected. At GRACE resolution, the 2004 December earthquake produced a strong coseismic decrease of the gravity field in the Andaman Sea, followed by relaxation in the area affected by both the Andaman 2004 and the Nias 2005 earthquakes. We find two characteristic timescales for the relaxation, with a fast variation occurring in the vicinity of the Central Andaman ridge. We discuss our coseismic observations in terms of density changes of crustal and upper-mantle rocks, and of the vertical displacements in the Andaman Sea. We interpret the post-seismic signal in terms of the viscoelastic response of the Earth's mantle. The transient component of the relaxation may indicate the presence of hot, viscous material beneath the active Central Andaman Basin. ?? 2007 The Authors Journal compilation ?? 2007 RAS.

  18. British Columbia Utilities Commission service plan 2004/2005 - 2006/2007

    International Nuclear Information System (INIS)

    2004-01-01

    The mandate of the British Columbia Utilities Commission (BCUC) is to ensure that customers receive safe, reliable and non-discriminatory energy services at fair rates from the utilities. It must also ensure that the shareholders of the utilities have a reasonable opportunity to earn a fair return on the invested capital. This report describes the following six key areas that underlie the Commission's strategic planning for the next 3 years: (1) regulation of automobile insurance, (2) energy policy implementation, (3) natural gas commodity costs, (4) commercial unbundling and customer choice, (5) energy trade, and (6) benchmarking. The report also describes strategic issues with reference to priorities, shifts and risk management. Alignment with the government's strategic plan was also reviewed. The financial outlook for 2003/04 and 2006/07 shows that the Commission intends to fully recover costs from the utilities it regulates. The budget for 2003/04 has increased somewhat from the forecasted amount for the same period reported in the previous year's service plan. This is due to an expanded mandate. Forecast values for the 2004/05 and 2005/06 planning periods have decreased slightly compared to the previous year's plan. tabs., figs

  19. Yakima River Species Interactions Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; Temple, Gabriel M.; Fritts, Anthony L. (Washington Department of Fish and Wildlife, Olympia, WA)

    2005-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from the Washington Department of Fish and Wildlife (WDFW) to the Bonneville Power Administration (BPA), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the thirteenth of a series of progress reports that address species interactions research and supplementation monitoring of fishes in response to supplementation of salmon and steelhead in the upper Yakima River basin (Hindman et al. 1991; McMichael et al. 1992; Pearsons et al. 1993; Pearsons et al. 1994; Pearsons et al. 1996; Pearsons et al. 1998, Pearsons et al. 1999, Pearsons et al. 2001a, Pearsons et al. 2001b, Pearsons et al. 2002, Pearsons et al. 2003, Pearsons et al. 2004). Journal articles and book chapters have also been published from our work (McMichael 1993; Martin et al. 1995; McMichael et al. 1997; McMichael and Pearsons 1998; McMichael et al. 1998; Pearsons and Fritts 1999; McMichael et al. 1999; McMichael et al. 1999; Pearsons and Hopley 1999; Ham and Pearsons 2000; Ham and Pearsons 2001; Amaral et al. 2001; McMichael and Pearsons 2001; Pearsons 2002, Fritts and Pearsons 2004, Pearsons et al. in press, Major et al. in press). This progress report summarizes data collected between January 1, 2004 and December 31, 2004. These data were compared to findings from previous years to identify general trends and make preliminary comparisons. Interactions between fish produced as part of the YKFP, termed target species or stocks, and other species or stocks (non-target taxa) may alter the population status of non-target species or stocks. This may occur through a variety of mechanisms, such as competition, predation, and interbreeding (Pearsons et al. 1994; Busack et al. 1997; Pearsons and Hopley 1999). Furthermore, the success of a supplementation program may

  20. Physical, chemical, and biological data collected during two research cruises in the Ross Sea, Antarctica from December 2004 to January 2005 and October to November 2005 for Ross Sea Sulfur Dynamics study (NODC Accession 0117322)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains transect data from two research cruises to the Ross Sea, Antarctica, aboard the RV Nathaniel B. Palmer (NBP) in December 2004 to January 2005...

  1. 2005 sales: organic growth of 3.7%; Chiffre d'affaires 2005: croissance organique de 3,7%

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-01-15

    The AREVA group's sales revenue for the year rose to 10,125 million euros, compared with 9,821 million euros in 2004, adjusted for the Connectors division, representing 3.1% growth in terms of reported data. Organic growth was up 3.7% for 2005. The nuclear divisions posted organic growth of 4.6%, signaled by: - growth in the Front End division (+5.2%) linked to the favorable price effect for uranium supplies and to climbing volumes in all of the division's businesses; - new projects in Finland, France and China and strong performance in services, the growth driver for the Reactors and Services division (+10.8%); - the drop in sales for the Back End division (-2.9%) following the 2004 completion of the support contract with Japanese customer JNFL; a contract extension for 2006 and 2007 was signed in late 2005. The Transmission and Distribution division recorded organic growth of 2.0%. The 5.8% increase in the second half of 2005 over 2004 offsets the downturn in the first half of 2005 compared with the same period in 2004, when a one-time peak was observed. New orders rose by 13.1% like-for-like over the period, resulting in a large backlog at the end of 2005. For the fourth quarter of 2005, the group recorded growth of 2.4% in reported data compared with the fourth quarter of 2004, and organic growth of 1.8%. Foreign exchange rate differences had a positive impact of 69 million euros.

  2. Detection and genetic characterization of norovirus strains circulating among infants and children with acute gastroenteritis in Japan during 2004-2005.

    Science.gov (United States)

    Phan, Tung Gia; Takanashi, Sayaka; Kaneshi, Kunio; Ueda, Yuichi; Nakaya, Shigekazu; Nishimura, Shuichi; Sugita, Kumiko; Nishimura, Tadashi; Yamamoto, Atsuko; Yagyu, Fumihiro; Okitsu, Shoko; Maneekarn, Niwat; Ushijima, Hiroshi

    2006-01-01

    A total of 752 fecal specimens collected during the period of July 2004 to June 2005 from infants and children with acute gastroenteritis from four different regions (Maizuru, Tokyo, Sapporo, and Osaka) of Japan were tested for the presence of norovirus by RT-PCR. It was found that 139 (18.5%) fecal specimens were positive for norovirus. Norovirus infection was detected almost all year round with the highest prevalence in January. Norovirus GII was the most predominant genogroup (98.6%; 137 of 139). The genotypes detected in this study were GI/1, GII/1, GII/3, GII/4, and GII/6. Of these, NoV GII/4 (known as the Lordsdale virus cluster) was re-emerging and became the leading genotype (77.7%). Meanwhile, the incidence of NoV GII/3 (known as the Arg320 virus cluster) has dropped rapidly, accounting for only 15.8%. Another interesting feature of the study was the identification of Picton03/AU-like recombinant NoV for the first time in Japan. Based on the genetic analysis, it was interesting to note that NoV GII/4 in 2004-2005 made a distinct cluster in comparison to other NoV GII/4 circulating in 2002-2003 and 2003-2004. Of note, "new recombinant variant designated GIIb" within NoV GII/3, which was first detected in Saga City, Japan in 2003-2004 in only one case, had increased, spreading widely in Japan and representing 45.5% (10 of 22). Further epidemiological studies should be conducted to determine whether this new recombinant variant strain will be dominant in Japan in the coming year.

  3. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  4. Erametsandus : [2002-2004] / Monika Lublo

    Index Scriptorium Estoniae

    Lublo, Monika, 1976-

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 112-118. 2001. a põllumajandusloenduse andmeil kuulus metsamaast 91% füüsilistele ja 9% juriidilistele isikutele. Tabelid

  5. Status of coastal forests of the Northern Sumatra in 2005 (after 2004’s tsunami catastrophe

    Directory of Open Access Journals (Sweden)

    ONRIZAL

    2016-04-01

    Full Text Available Abstract. Onrizal, Mansor M. 2015. Status of coastal forests of the Northern Sumatra in 2005 (after 2004’s tsunami catastrophe. Biodiversitas 17: 44-54. The first intensive ecological study of coastal vegetation including mangrove, littoral and peat swamp forests after the 2004 tsunami catastrophe in Northern Sumatra was conducted from January to December 2005 where 16 sampling sites along 2960km coastline in Northern Sumatra were selected. In each site, one quadrat of 100 m x 100 m was established and divided into 10 m x 10 m subplots where all standing trees of ≥ 2 cm diameter at breast height (DBH were identified to species level and measured. Overall 54,871 standing trees were recorded in 16 sites comprising 84 species in 65 genera and 37 families. Mangrove trees Rhizophora apiculata and R. mucronata were widely distributed and are dominant in most of the sampling sites. This indicated that these species have stronger resilient compared to other species. The highest value of Shannon-Wiener index of species and Evenness index of species was 3.03 and 0.85, respectively. It means that some sites were rich in biodiversity which harbors various species of plants. Subsequently, undisturbed coastal forests including mangroves, littoral forests and peat swamp forests characterized by dense stands, mixed species and structures play an important role in coastal protection against tsunami. Therefore, the coastal vegetation is needed to conserve the biodiversity and to maintain the production capacity as part of sustainable and longlasting vegetation bioshield.

  6. Pleistocene Lake Bonneville and Eberswalde Crater of Mars: Quantitative Methods for Recognizing Poorly Developed Lacustrine Shorelines

    Science.gov (United States)

    Jewell, P. W.

    2014-12-01

    The ability to quantify shoreline features on Earth has been aided by advances in acquisition of high-resolution topography through laser imaging and photogrammetry. Well-defined and well-documented features such as the Bonneville, Provo, and Stansbury shorelines of Late Pleistocene Lake Bonneville are recognizable to the untrained eye and easily mappable on aerial photos. The continuity and correlation of lesser shorelines must rely quantitative algorithms for processing high-resolution data in order to gain widespread scientific acceptance. Using Savitsky-Golay filters and the geomorphic methods and criteria described by Hare et al. [2001], minor, transgressive, erosional shorelines of Lake Bonneville have been identified and correlated across the basin with varying degrees of statistical confidence. Results solve one of the key paradoxes of Lake Bonneville first described by G. K. Gilbert in the late 19th century and point the way for understanding climatically driven oscillations of the Last Glacial Maximum in the Great Basin of the United States. Similar techniques have been applied to the Eberswalde Crater area of Mars using HRiSE DEMs (1 m horizontal resolution) where a paleolake is hypothesized to have existed. Results illustrate the challenges of identifying shorelines where long term aeolian processes have degraded the shorelines and field validation is not possible. The work illustrates the promises and challenges of indentifying remnants of a global ocean elsewhere on the red planet.

  7. Recent changes in Imja Glacial Lake and its damming moraine in the Nepal Himalaya revealed by in situ surveys and multi-temporal ASTER imagery

    International Nuclear Information System (INIS)

    Fujita, Koji; Sakai, Akiko; Nuimura, Takayuki; Yamaguchi, Satoru; Sharma, Rishi R

    2009-01-01

    Changes in the area and bathymetry of Imja Glacial Lake and in the elevation of its damming moraine, Khumbu region, Nepal Himalaya are investigated. Previously reported changes in the lake area have been updated by multi-temporal ASTER images, which revealed a decreased expansion rate after 2000. A provisional expansion of the lake observed in 2004, from which some studies concluded an accelerated lake expansion due to global warming, has, from 2005, subsided to the glacier surface. Bathymetric changes for the period 1992-2002 that were first obtained for Himalayan glacial lakes suggest that the melting of debris-covered ice beneath the lake is insignificant in terms of the increase in lake volume, and that the retreat of a glacier in contact with the lake by calving is essential for the lake's expansion. Changes in the height of a damming moraine for the period 2001-2007 suggest a continuous surface lowering near the lake, though the lowering rates are smaller than those for the period 1989-1994.

  8. Theses defended at Tunis Faculty of Medecine from 2004 to 2005: Scientific become and predictive factors of publications.

    Science.gov (United States)

    Elloumi, Hela; Bouarrouj, Reem; Chadli Debbiche, Ashraf; Mrabet, Ali; Dziri, Chadli

    2017-04-01

    Several theses are supported, every year, in the Faculty of Medicine of Tunis but their scientific become is this day unknown. The most part of specialities have not bibliometric data. This work had for objectives to study the still unknown future of theses of Tunis Faculty of Medecine during 2004-2005, in terms of publication in indexed reviews and to determine the predictive factors of their publication. This was a descriptive bibliometric study of theses supported at the Tunis Faculty of Medicine between January 1st, 2004 and december 31st, 2005. The data collected concerned :number of theses, involved specialities, discipline, type of theses, type of study, number of studied cases (theses. The publication of the theses has been sought in engines "Medline" and "scopus. Predictive factors for publication were sought. Six hundred and thirteen theses were supported, including 57.7% belonged to the medical disciplines. The attributed mention was "very honorable with the congratulations of the jury" in 71,0% of cases and "very honorable with the congratulations of the jury and the proposal at the price of thesis " in 24,0% of the cases. Thirteen comma four pourcent (13.4%) was the rate of publication. These theses were published when the attributed mention was "very honorable with the congratulations of the jury and the proposal at the price of thesis "(p=0.05), when the discipline was community (p theses-teacher- year was lower than 1 in 70% of cases and the index of becoming theses varied from 0 and 18.7 across all disciplines. The thesis were published in half of the cases in the the review"La Tunisie Médicale". The median of citation was 2 [0-66 citations]. The publication was found thanks to the name of the student which appeared as author in 61.0% of the theses. The student was first author in 12 cases (24.5%). The rate of publication of theses of Tunis Faculty of Medecine during 2004-2005 aws little raised by 13.4%. This rate should be considered as a basic

  9. International Atomic Energy Agency publications. Publications catalogue 2005 including full details of publications published in 2003-2004 and forthcoming in 2005 and a stocklist of publications published in 2001-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-03-15

    This Publications Catalogue lists all sales publications of the IAEA published in 2003, 2004 and forthcoming in 2005. Most IAEA publications are issued in English, some are also available in Arabic, Chinese, French, Russian or Spanish. This is indicated at the bottom of the book entry. A complete listing of all IAEA priced publications is available on the IAEA's web site: http://www.iaea.org/books.

  10. International Atomic Energy Agency publications. Publications catalogue 2005 including full details of publications published in 2003-2004 and forthcoming in 2005 and a stocklist of publications published in 2001-2002

    International Nuclear Information System (INIS)

    2005-03-01

    This Publications Catalogue lists all sales publications of the IAEA published in 2003, 2004 and forthcoming in 2005. Most IAEA publications are issued in English, some are also available in Arabic, Chinese, French, Russian or Spanish. This is indicated at the bottom of the book entry. A complete listing of all IAEA priced publications is available on the IAEA's web site: http://www.iaea.org/books

  11. De essentie van de daling in het aantal verkeersdoden : ontwikkelingen in 2004 en 2005, en nieuwe prognoses voor 2010 en 2020.

    NARCIS (Netherlands)

    Stipdonk, H.L. Aarts, L.T. Schoon, C.C. & Wesemann, P.

    2006-01-01

    The essence of the decrease in the number of road deaths; Developments in 2004 and 2005, and new prognoses for 2010 and 2020. During the last 15 to 20 years there was a 2.5% annual decrease in the number of road deaths. This decrease is attributed to all kinds of important, gradual improvements of

  12. Migratory Behavior and Survival of Juvenile Salmonids in the Lower Columbia River, Estuary, and Plume in 2010

    Energy Technology Data Exchange (ETDEWEB)

    McMichael, Geoffrey A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, John R. [Univ. of Washington, Seattle, WA (United States); Deters, Katherine A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Univ. of Washington, Seattle, WA (United States); Titzler, P. Scott [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, Michael S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Trott, Donna M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2011-09-01

    Uncertainty regarding the migratory behavior and survival of juvenile salmonids passing through the lower Columbia River and estuary after negotiating dams on the Federal Columbia River Power System (FCRPS) prompted the development and application of the Juvenile Salmon Acoustic Telemetry System (JSATS). The JSATS has been used to investigate the survival of juvenile salmonid smolts between Bonneville Dam (river kilometer (rkm) 236) and the mouth of the Columbia River annually since 2004. In 2010, a total of 12,214 juvenile salmonids were implanted with both a passive integrated transponder (PIT) and a JSATS acoustic transmitter. Using detection information from JSATS receiver arrays deployed on dams and in the river, estuary, and plume, the survival probability of yearling Chinook salmon and steelhead smolts tagged at John Day Dam was estimated form multiple reaches between rkm 153 and 8.3 during the spring. During summer, the survival probability of subyearling Chinook salmon was estimated for the same reaches. In addition, the influence of routes of passage (e.g., surface spill, deep spill, turbine, juvenile bypass system) through the lower three dams on the Columbia River (John Day, The Dalles, and Bonneville) on juvenile salmonid smolt survival probability from the dams to rkm 153 and then between rkm 153 and 8.3 was examined to increase understanding of the immediate and latent effects of dam passage on juvenile salmon survival. Similar to previous findings, survival probability was relatively high (>0.95) for most groups of juvenile salmonids from the Bonneville Dam tailrace to about rkm 50. Downstream of rkm 50 the survival probability of all species and run types we examined decreased markedly. Steelhead smolts suffered the highest mortality in this lower portion of the Columbia River estuary, with only an estimated 60% of the tagged fish surviving to the mouth of the river. In contrast, yearling and subyearling Chinook salmon smolts survived to the mouth

  13. 2005 sales: organic growth of 3.7%

    International Nuclear Information System (INIS)

    2006-01-01

    The AREVA group's sales revenue for the year rose to 10,125 million euros, compared with 9,821 million euros in 2004, adjusted for the Connectors division, representing 3.1% growth in terms of reported data. Organic growth was up 3.7% for 2005. The nuclear divisions posted organic growth of 4.6%, signaled by: - growth in the Front End division (+5.2%) linked to the favorable price effect for uranium supplies and to climbing volumes in all of the division's businesses; - new projects in Finland, France and China and strong performance in services, the growth driver for the Reactors and Services division (+10.8%); - the drop in sales for the Back End division (-2.9%) following the 2004 completion of the support contract with Japanese customer JNFL; a contract extension for 2006 and 2007 was signed in late 2005. The Transmission and Distribution division recorded organic growth of 2.0%. The 5.8% increase in the second half of 2005 over 2004 offsets the downturn in the first half of 2005 compared with the same period in 2004, when a one-time peak was observed. New orders rose by 13.1% like-for-like over the period, resulting in a large backlog at the end of 2005. For the fourth quarter of 2005, the group recorded growth of 2.4% in reported data compared with the fourth quarter of 2004, and organic growth of 1.8%. Foreign exchange rate differences had a positive impact of 69 million euros

  14. An Industrial-Based Consortium to Develop Premium Carbon Products from Coal, Annual Progress Report, October 1, 2004 through September 30, 2005

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Bruce G

    2006-03-01

    Since 1998, The Pennsylvania State University (PSU) has been successfully operating the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by PSU, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with PSU responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350. This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes PSU and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. A second contract was executed with DOE NETL starting in October 2003 to continue the activities of CPCPC. An annual funding meeting was held in October 2003 and the council selected ten projects for funding. Base funding for the projects is provided by NETL with matching funds from industry. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten projects have been completed and the final reports for these 2004 projects are attached. An annual funding meeting was held in November 2004 and the council

  15. Institute of Nuclear physics of Lyon - IPNL, Activity Report 2004-2005

    International Nuclear Information System (INIS)

    2006-01-01

    The Institute of Nuclear physics of Lyon (IPNL) is under the joint supervision of the Claude Bernard University of Lyon (UCBL) and the National Institute of Nuclear and particle physics (IN2P3) of the CNRS (National Centre for Scientific Research). The laboratory studies the properties and interactions of sub-atomic particles. Its activities are largely experimental, with groups involved in a wide range of national and international collaborations concerning particle and astro-particle physics, nuclear matter and the interactions of ions and cluster with matter. In addition, the Institute has important interdisciplinary and applied research activities related to: detectors R and D, confinement of radioactive waste, bio-medical imaging, measurement of environmental levels of radioactive elements. This document presents the activity of the Centre during the 2004-2005 years: 1 - Research topics: Quarks and Leptons; Astro-particles; Hadronic and nuclear matter; Theoretical physics; trans-disciplinary activities; 2 - Technical support to experiments (electronics, Computers, Mechanics, Instrumentation, Radiation protection, Accelerators, LABRADOR metrology service, Administration); 3 - Transverse activities (Training, Science and society, Communication, Documentation); 4 - Scientific life (publications, seminars, conferences, exhibitions, PhDs..); 5 - Manpower (Permanent training, Staff)

  16. Nuclear and high-energy physics laboratory - LPNHE. Activity report 2004-2005

    International Nuclear Information System (INIS)

    Debu, Pascal; Bassler, Ursula; Boratav, Murat; Lacour, Didier; Lebbolo, Herve; Cossin, Isabelle; Mathy, Jean-Yves

    2006-01-01

    The LPNHE is a joint research unit (UMR 7585) of the National Institute of Nuclear Physics and Particle Physics (IN2P3), Institute of the National Centre for Scientific Research (CNRS), UPMC and Paris Diderot Paris 7. It hosts several research teams and technical services (computers, electronics, mechanical), and two support services (administration, logistics). The laboratory is engaged in several major experimental programs pursued in the framework of international collaborations with very large research facilities around the world, centers of particle accelerators and observatories. The research programs cover current issues in particle physics, astro-particle and cosmology. This report presents the activities of the laboratory during the years 2004-2005: 1 - Forewords; 2 - Scientific activities: Physics with accelerators (LHC, Tevatron, CP Violation, future linear electron collider, Neutrino beams); Physics without accelerators (Cosmology and supernovae, high-energy gamma astronomy, extreme energy cosmic radiation, theoretical physics, physics-biology interface); 3 - Technical and administrative activities (electronics, computers, mechanics departments, Administration, health and safety, radiation protection); 4 - Laboratory life (Teaching, training, internships and PhDs); 5 - Internal activities (seminars, meetings..); 6 - External activities (Public information, relations with the industry, valorisation..); 7 - List of publications; 8 - Appendixes: organigram, staff

  17. Põllumajandussektori tulude areng 2004. aastal (EAA alusel) / Kristel Maidre

    Index Scriptorium Estoniae

    Maidre, Kristel, 1978-

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 87-89. Esialgsetel andmetel kujunes põllumajanduse majandusharu toodanguks koos toetustega 2004. a 7,3 mld krooni, millest tootetoetused taime- ja loomakasvatusele moodustasid 5,4% (392,9 mln krooni). Tabel

  18. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  19. Seasonal Juvenile Salmonid Presence and Migratory Behavior in the Lower Columbia River

    Energy Technology Data Exchange (ETDEWEB)

    Carter, Jessica A.; McMichael, Geoffrey A.; Welch, Ian D.; Harnish, Ryan A.; Bellgraph, Brian J.

    2009-04-30

    To facilitate preparing Biological Assessments of proposed channel maintenance projects, the Portland District of the U.S. Army Corps of Engineers contracted the Pacific Northwest National Laboratory to consolidate and synthesize available information about the use of the lower Columbia River and estuary by juvenile anadromous salmonids. The information to be synthesized included existing published documents as well as data from five years (2004-2008) of acoustic telemetry studies conducted in the Columbia River estuary using the Juvenile Salmon Acoustic Telemetry System. For this synthesis, the Columbia River estuary includes the section of the Columbia River from Bonneville Dam at river kilometer (Rkm) 235 downstream to the mouth where it enters the Pacific Ocean. In this report, we summarize the seasonal salmonid presence and migration patterns in the Columbia River estuary based on information from published studies as well as relevant data from acoustic telemetry studies conducted by NOAA Fisheries and the Pacific Northwest National Laboratory (PNNL) between 2004 and 2008. Recent acoustic telemetry studies, conducted using the Juvenile Salmon Acoustic Telemetry System (JSATS; developed by the Portland District of the U.S. Army Corps of Engineers), provided information on the migratory behavior of juvenile steelhead (O. mykiss) and Chinook salmon in the Columbia River from Bonneville Dam to the Pacific Ocean. In this report, Section 2 provides a summary of information from published literature on the seasonal presence and migratory behavior of juvenile salmonids in the Columbia River estuary and plume. Section 3 presents a detailed synthesis of juvenile Chinook salmon and steelhead migratory behavior based on use of the JSATS between 2004 and 2008. Section 4 provides a discussion of the information summarized in the report as well as information drawn from literature reviews on potential effects of channel maintenance activities to juvenile salmonids rearing in

  20. Environmental and effluent monitoring at ANSTO sites, 2004-2005

    International Nuclear Information System (INIS)

    Hoffmann, Emmy L.; Loosz, Tom; Ferris, John M.; Harrison, Jennifer J.

    2005-01-01

    This report presents the results of ANSTO's environmental and effluent monitoring at the Lucas Heights Science and Technology Centre (LHSTC) and the National Medical Cyclotron (NMC) sites, from July 2004 to June 2005. Effective doses to the critical group of members of the public potentially affected by routine airborne emissions from the LHSTC were less than 0.005 mSv/year. This estimated maximum potential dose is less than 24% of the ANSTO ALARA objective of 0.02 mSv/year, and much lower than the public dose limit of 1 mSv/year that is recommended by the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA). The effective doses to the critical group of members of the public potentially exposed to routine liquid effluent releases from the LHSTC have been realistically estimated as a quarter (or less) of the estimated doses to the critical group for airborne releases. The levels of tritium detected in groundwater and stormwater at the LHSTC were less than those set out in the Australian Drinking Water Guidelines. The airborne and liquid effluent emissions from the NMC were below both the ARPANSA-approved notification levels and Sydney Water limits for acceptance of trade wastewater to sewer. Results of environmental monitoring at both ANSTO sites confirm that the facilities continue to be operated well within regulatory limits. ANSTO's routine operations at the LHSTC and NMC make only a very small addition to the natural background radiation dose of ∼1.5 mSv/year experienced by members of the Australian public

  1. Wind River Watershed Restoration, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Jezorek, Ian G.; Connolly, Patrick J.; Munz, Carrie [U.S. Geological Survey

    2008-11-10

    This report summarizes work completed by U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) in the Wind River subbasin during the period April 2005 through March 2006 under Bonneville Power Administration (BPA) contract 22095. During this period, we collected temperature, flow, and habitat data to characterize habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. We also conducted electrofishing and snorkeling surveys to determine juvenile salmonid populations within select study areas throughout the subbasin. Portions of this work were completed with additional funding from U.S. Fish and Wildlife Service (USFWS) and the Lower Columbia Fish Enhancement Group (LCFEG). A statement of work (SOW) was submitted to BPA in March 2005 that outlined work to be performed by USGS-CRRL. The SOW was organized by work elements, with each describing a research task. This report summarizes the progress completed under each work element.

  2. Effects of the Operation of Kerr and Hungry Horse Dams on the Kokanee Fishery in the Flathead River System, 1979-1985 Final Research Report.

    Energy Technology Data Exchange (ETDEWEB)

    Clancy, Patrick

    1986-05-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. Studies concerning operation of the dam on the Flathead River aquatic biota began in 1979 and continued to 1982 under Bureau of Reclamation funding. These studies resulted in flow recommendations for the aquatic biota in the main stem Flathead River, below the influence of Hungry Horse Dam on the South Fork. Studies concerned specifically with kokanee salmon have continued under Bonneville Power Administration funding since 1982. This completion report covers the entire study period (September 1979 to June 1985). Major results of this study were: (1) development and refinement of methods to assess hydropower impacts on spawning and incubation success of kokanee; (2) development of a model to predict kokanee year class strength from Flathead River flows; and (3) implementation of flows favorable for successful kokanee reproduction. A monitoring program has been developed which will assess the recovery of the kokanee population as it proceeds, and to recommend management strategies to maintain management goals for the kokanee fishery in the river system.

  3. "Telling our stories": Print media interpretations of Moscow lesbians' life stories in 2004 and 2005.

    Science.gov (United States)

    Bingham, Natasha

    2017-01-02

    This article analyzes print media interviews of Moscow lesbians in Moskovsky Komsomolets in 2004 and 2005 using qualitative content analysis. The qualitative content analysis shows recurring and consistent themes: (1) the stereotypes lesbians face; (2) public negativity toward same-sex relations and the impact on their families; (3) the expectations of heterosexuality and all that that entails; (4) the existence of lesbian-only spaces in Russia and the importance of those spaces; and (5) the complexities of navigating motherhood, previous heterosexual relationships, and current partnerships. Analysis of print media representations of female same-sex sexuality in a period of economic prosperity, popular culture visibility, and before restrictive laws were passed that suppress homosexuality adds to the previous literature on lesbianism in Russia.

  4. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Mallette, Christine [Oregon Department of Fish and Wildlife

    2009-07-28

    We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  5. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; McMichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, X.; Fu, Tao

    2014-03-28

    bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

  6. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison H.A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jones, Bryan W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanson, Amanda C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Trott, Donna M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mcmichael, Geoffrey A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Brown, Richard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-15

    bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

  7. 2005 Guidelines for Advancement and Promotion

    CERN Multimedia

    Human Resources Department

    2005-01-01

    1. General The Director-General has now fixed the guidelines and schedule for the 2005 annual advancement review in the framework of the Merit Advancement and Promotion Scheme (MAPS). Procedures are set out in Administrative Circular N° 6 (Rev. 5). Decisions will be made, where possible, by 1 July 2005 except for career path changes for staff in Career Paths A to D which will be made by 31 October 2005 and applied retroactively to 1 July 2005. Departments are invited to comply strictly with the target date for the completion of the annual interviews which this year has been fixed at 15 March 2005. Exceptions due to particular circumstances (e.g. long-term absences) must be documented. As already announced in Weekly Bulletin 48/2004-22.11.2004 and further explained in Weekly Bulletin 3/2005-17.1.2005, the annual appraisal report should be completed using the electronic version in the EDH system. 2. Budget guidelines Within the annual advancement budget, the guideline allocations have been defi...

  8. Rainfall response to dam/irrigation projects in northern Nigeria ...

    African Journals Online (AJOL)

    In this paper, we examine the possibility that the increasing number and size of dam/irrigation projects in northern Nigeria are having a corresponding increase in rainfall in spite of the threat of climate change. We modeled the rainfall trends over 11 meteorological stations over a period of 34 years (1971 - 2004). The trends ...

  9. Annual summary of vital statistics: 2005.

    Science.gov (United States)

    Hamilton, Brady E; Miniño, Arialdi M; Martin, Joyce A; Kochanek, Kenneth D; Strobino, Donna M; Guyer, Bernard

    2007-02-01

    The general fertility rate in 2005 was 66.7 births per 1000 women aged 15 to 44 years, the highest level since 1993. The birth rate for teen mothers (aged 15 to 19 years) declined by 2% between 2004 and 2005, falling to 40.4 births per 1000 women, the lowest ever recorded in the 65 years for which there are consistent data. The birth rates for women > or = 30 years of age rose in 2005 to levels not seen in almost 40 years. Childbearing by unmarried women also increased to historic record levels for the United States in 2005. The cesarean-delivery rate rose by 4% in 2005 to 30.2% of all births, another record high. The preterm birth rate continued to rise (to 12.7% in 2005), as did the rate for low birth weight births (8.2%). The infant mortality rate was 6.79 infant deaths per 1000 live births in 2004, not statistically different from the rate in 2003. Pronounced differences in infant mortality rates by race and Hispanic origin continue, with non-Hispanic black newborns more than twice as likely as non-Hispanic white and Hispanic infants to die within 1 year of birth. The expectation of life at birth reached a record high in 2004 of 77.8 years for all gender and race groups combined. Death rates in the United States continued to decline, with death rates decreasing for 9 of the 15 leading causes. The crude death rate for children aged 1 to 19 years did not decrease significantly between 2003 and 2004. Of the 10 leading causes of death for 2004 in this age group, only the rates for influenza and pneumonia showed a significant decrease. The death rates increased for intentional self-harm (suicide), whereas rates for other causes did not change significantly for children. A large proportion of childhood deaths continue to occur as a result of preventable injuries.

  10. Liha tootmine : [2000-2004 Eestis liikide kaupa, s.h. ka kitseliha] / Matti Piirsalu

    Index Scriptorium Estoniae

    Piirsalu, Matti, 1947-

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 20-22. 2004. a. vähenes sealihatoodang 3%, lamba- ja kitseliha toodang 25%.Veise- ja linnuliha tootmine kasvas kubki 5%. Tabel: Lihatoodang aastatel 2000-2004

  11. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia.

    Science.gov (United States)

    Yewhalaw, Delenasaw; Legesse, Worku; Van Bortel, Wim; Gebre-Selassie, Solomon; Kloos, Helmut; Duchateau, Luc; Speybroeck, Niko

    2009-01-29

    Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam) and three 'control' villages (5 to 8 km from dam). The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Overall 1,855 children (905 girls and 950 boys) were surveyed. A total of 194 (10.5%) children were positive for malaria, of which, 117 (60.3%) for Plasmodium vivax, 76 (39.2%) for Plasmodium falciparum and one (0.5%) for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR) = 1.63, 95% CI = 1.15, 2.32) and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not significant (OR = 2.40, 95% CI = 0.84, 6.88). A

  12. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.

  13. Monitoring of downstream salmon and steelhead trout at federal hydroelectric facilities, annual report 2001.; ANNUAL

    International Nuclear Information System (INIS)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    2002-01-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River (Figure 1). The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration

  14. Powernext Day-AheadTM statistics April 30, 2005

    International Nuclear Information System (INIS)

    2005-04-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the April 30, 2005 update of Powernext Day-Ahead TM statistics: traded volumes and average prices from November 2001 to April 2005, monthly overview from April 2004 to April 2005 (volumes, prices and price spreads), weekly overview from January to April 2005, daily and hourly overview and market resilience for April 2005, power consumption in March and April 2005 (average consumption, average forecasted consumption and average price on Powernext Day-Ahead TM ), power consumption on the French hub from January to April 2005 and Powernext Day-Ahead TM prices, transfer capacities in April 2005 (daily capacity allocations for France-Germany, France-Switzerland and France-Spain, daily and monthly capacity allocations for France-Belgium, auction on the France-UK Interconnector, daily and yearly capacity allocation for France-Italy), temperature variations in France from November 2004 to April 2005 and average prices on Powernext Day-Ahead TM , and balancing mechanism for March-April 2005 (half-hourly imbalance settlement prices). (J.S.)

  15. Recent changes in Imja Glacial Lake and its damming moraine in the Nepal Himalaya revealed by in situ surveys and multi-temporal ASTER imagery

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, Koji; Sakai, Akiko; Nuimura, Takayuki [Graduate School of Environmental Studies, Nagoya University, Nagoya 464-8601 (Japan); Yamaguchi, Satoru [Snow and Ice Research Center, National Research Institute for Earth Science and Disaster Prevention, Nagaoka 940-0821 (Japan); Sharma, Rishi R [Department of Hydrology and Meteorology, Ministry of Environment, Science and Technology, Babar Mahal, Kathmandu (Nepal)

    2009-10-15

    Changes in the area and bathymetry of Imja Glacial Lake and in the elevation of its damming moraine, Khumbu region, Nepal Himalaya are investigated. Previously reported changes in the lake area have been updated by multi-temporal ASTER images, which revealed a decreased expansion rate after 2000. A provisional expansion of the lake observed in 2004, from which some studies concluded an accelerated lake expansion due to global warming, has, from 2005, subsided to the glacier surface. Bathymetric changes for the period 1992-2002 that were first obtained for Himalayan glacial lakes suggest that the melting of debris-covered ice beneath the lake is insignificant in terms of the increase in lake volume, and that the retreat of a glacier in contact with the lake by calving is essential for the lake's expansion. Changes in the height of a damming moraine for the period 2001-2007 suggest a continuous surface lowering near the lake, though the lowering rates are smaller than those for the period 1989-1994.

  16. A short-term study of the state of surface water acidification at Semenyih dam

    International Nuclear Information System (INIS)

    Kantasamy, Nesamalar; Sumari, S.M.; Salam, S.M.; Riniswani Aziz

    2007-01-01

    A short-term study was done to analyze the state of acidification of surface water at Semenyih Dam. This study is part of a continuous monitoring programme for Malaysia as a participatory country of EANET (Acid Monitoring Network in East Asia). Surface water samples were taken at selected points of the dam from February to December 2005. Temperature, electrical conductivity, pH, alkalinity, acid neutralizing capacity (ANC) as well as concentration of specific ionic species were measured, determined and analysed in this study. Present available sort-term study data indicates Semenyih Dam surface water is currently not undergoing acidification. (author)

  17. Kala töötlemine : [andmeid aastatest 1995-2004] / Maarja Purik

    Index Scriptorium Estoniae

    Purik, Maarja

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 49-52. Kalatöötlemise osatähtsus toiduainetööstuses moodustas 2004. a. 11,9% ja ekspordis 24,9%. Tabelid. Diagrammid

  18. Escapement and Productivity of Spring Chinook and Summer Steelhead in the John Day River Basin, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Wayne

    2007-04-01

    Chinook and 4,913 steelhead during the spring of 2005. We estimated that 130,144 (95% CL's 97,133-168,409) Chinook emigrated from the upper John Day subbasin past our seining area in the Mainstem John Day River (river kilometers 274-296) between February 4 and June 16, 2005. We also estimated that 32,601 (95% CL's 29,651 and 36,264) Chinook and 47,921 (95% CL's 35,025 and 67,366) steelhead migrated past our Mainstem rotary screw trap at river kilometer (rkm) 326 between October 4, 2004 and July 6, 2005. We estimated that 20,193 (95% CL's 17,699 and 22,983) Chinook and 28,980 (95% CL's 19,914 and 43,705) steelhead migrated past our Middle Fork trap (rkm 24) between October 6, 2004 and June 17, 2005. Seventy three percent of PIT tagged steelhead migrants were age-2 fish, 13.8% were age-3, 12.7% were age-2, and 0.3% were age 4. Spring Chinook SAR for the 2002 brood year was estimated at 2.5% (100 returns of 4,000 PIT tagged smolts). Preliminary steelhead SAR (excluding 2-ocean fish) for the 2004 tagging year was estimated at 1.61% (60 returns of 3,732 PIT-tagged migrants).

  19. Mahepõllumajandus : [1999-2004, ka ökomärgist] / Peeter Prass

    Index Scriptorium Estoniae

    Prass, Peeter

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk.43-45. Hinnanguliselt moodustas 2004. a. mahepõllundusega hõivatud maa üldisest põllumajandusmaast alla 5%. Piimalehmadest olid maheloomad veidi üle 2%. Diagrammid

  20. Analysis of past and future dam formation and failure in the Santa Cruz River (San Juan province, Argentina)

    Science.gov (United States)

    Penna, Ivanna M.; Derron, Marc-Henri; Volpi, Michele; Jaboyedoff, Michel

    2013-03-01

    Around 11.5 ∗ 106 m3 of rock detached from the eastern slope of the Santa Cruz valley (San Juan province, Argentina) in the first fortnight of January 2005. The rockslide-debris avalanche blocked the course, resulting in the development of a lake with maximum length of around 3.5 km. The increase in the inflow rate from 47,000-74,000 m3/d between April and October to 304,000 m3/d between late October and the first fortnight of November, accelerated the growing rate of the lake. On 12 November 2005 the dam failed, releasing 24.6 ∗ 106 m3 of water. The resulting outburst flood caused damages mainly on infrastructure, and affected the facilities of a hydropower dam which was under construction 250 km downstream from the source area. In this work we describe causes and consequences of the natural dam formation and failure, and we dynamically model the 2005 rockslide-debris avalanche with DAN3D. Additionally, as a volume ~ 24 ∗ 106 m3of rocks still remain unstable in the slope, we use the results of the back analysis to forecast the formation of a future natural dam. We analyzed two potential scenarios: a partial slope failure of 6.5 ∗ 106 m3 and a worst case where all the unstable volume remaining in the slope fails. The spreading of those potential events shows that a new blockage of the Santa Cruz River is likely to occur. According to their modeled morphometry and the contributing watershed upstream the blockage area, as the one of 2005, the dams would also be unstable. This study shows the importance of back and forward analysis that can be carried out to obtain critical information for land use planning, hazards mitigation, and emergency management.

  1. The 2005 European e-Business Readiness Index

    OpenAIRE

    Pennoni, Fulvia; Tarantola, Stefano; Latvala, Ari

    2006-01-01

    Assessment of the eEurope 2005 Action Plan Benchmarking Index “E-Business Readiness Composite Indicator” using data collected by National Statistical Institutes and harmonised by Eurostat, using surveys “ICT usage of enterprises”, with reference years 2003 and 2004. This report contains data from 26 countries as collected in 2004 and as reported by Eurostat in June 2005. Performed analyses include obustness analysis, uncertainty and sensitivity analysis for two categories of ICT (Adoption ...

  2. The results of screening examinations of breast cancer conducted from 2004 to 2005 in Sierpc poviat

    International Nuclear Information System (INIS)

    Nowicki, A.; Milecka, A.

    2007-01-01

    Background: Breast cancer is one of the most common malignant neoplasms among women in Poland. 11733 new cases were registered in 2003. Well organized screening examinations are the most effective method of fighting against breast cancer. Aim of study: The main objective of this work was a preliminary analysis of a prophylactic examination programme for breast cancer in Sierpc district performed by the Independent Unit of Public Health Care Centres in Sierpc during the period of 2004 to 2005. Material and methods: The research was performed based on retrospective analysis of files obtained from the Department of Radiology of the Independent Unit of Public Health Care Centres in Sierpc. Prophylactic examination for detection of breast cancer includes physical examination of the breast as well as mammography. Results: The research includes 1291 women, most of them at age 50-55 years (57.1 years on average). City residents represent the biggest group of women. Nearly half of women had their first menstruation at the age of 14 to 15 years. The last menstruation occurred at age between 46 and 50 years old most frequently. The average number of labours was 2.3 and 2.5 during the analyzed period. The first labour occurred most frequently in women at the age of 21 to 25 years old. Most of the women never took previously and still do not take hormonal medicines. 80% of women have done breast self examination but over half of them (60.8%) did it occasionally. Breast examination done by a gynaecologist was performed in 22% of women during the last year. Breast cancer did not occur among family members in most of the analyzed women. Breast pain was the most frequent complaint. Over half of women (64.6%) previously underwent mammography. The biggest group among them (31.1%) includes women who had mammography between 2003 and 2004. Adipose glandular breast texture was detected in near half of women (43.5%). The result of mammography was normal in most analyzed women (87.1%). A

  3. Characterization of landslide dams in the San Juan province (Argentina)

    Science.gov (United States)

    Penna, Ivanna; Longchamp, Celine; Derron, Marc-Henri; Jaboyedoff, Michel

    2013-04-01

    River blockages caused by landslide deposition are common phenomena in active mountain chains, influencing erosion-sedimentation patterns and acting as primary and secondary hazards. Regional scale analyses regarding their spatial distribution and morphometry allow establishing boundary conditions for their occurrence and stability, and determine differences among regions with different landscape and climatic conditions. Owing to the combination of endogenous and exogenous factors, landslide dams are frequent phenomena in the Andes. In the Argentinean NW and the Patagonian Andes, previous studies showed that stability of landslide dams determined by morphometric parameters generally matched satisfactorily with dam behavior, with some exceptions in which climatic component played an important role in dam longevity. Aiming to expand the knowledge of landslide dams in the Argentinean Andes, in this work we analyzed the stability of rock avalanche dams in the Pampeam flat slab subduction zone. In the study area, mountain dynamics creates suitable conditions for the occurrence of 34 rock avalanches with volumes up to 0.3 km3. They developed in deeply carved valleys (Cordillera) and Inter-thrust valleys (Precordillera). 22 impoundments of rivers resulted from channelized rock avalanches with long runouts (4-10 km) that blocked tributaries rivers, but most of them by rock avalanches that filled the valley bottom, with run up in the opposite slope and limited movement parallel to the valley axis. Most of the dams breached in unknown times, except for the last event that occurred on November 12th 2005. The quantification of morphometric parameters and contributing areas indicates the existence of dams with dimensionless blockage index above 2.75 (stable domain) and below 3.08 (instable domain). The Los Erizos dam in our study area and the Barrancas dam in the Patagonian Andes show that besides morphometric parameters, climatic conditions are decisive. Stable landslide dams

  4. Appointment with Climate 2005; Rendez-vous climat 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This document takes stock on the situation one year after the Climate Plan decided by the government in July 2004. It provides the allocutions of politicians occurred during the 14 and 15 November 2005 and a synthesis of the main questions and problems discussed during these two days. (A.L.B.)

  5. Enumeration of Salmonids in the Okanogan Basin Using Underwater Video, Performance Period: October 2005 (Project Inception) - 31 December 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Peter N.; Rayton, Michael D.; Nass, Bryan L.; Arterburn, John E.

    2007-06-01

    The Confederated Tribes of the Colville Reservation (Colville Tribes) identified the need for collecting baseline census data on the timing and abundance of adult salmonids in the Okanogan River Basin in order to determine basin and tributary-specific spawner distributions, evaluate the status and trends of natural salmonid production in the basin, document local fish populations, and augment existing fishery data. This report documents the design, installation, operation and evaluation of mainstem and tributary video systems in the Okanogan River Basin. The species-specific data collected by these fish enumeration systems are presented along with an evaluation of the operation of a facility that provides a count of fish using an automated method. Information collected by the Colville Tribes Fish & Wildlife Department, specifically the Okanogan Basin Monitoring and Evaluation Program (OBMEP), is intended to provide a relative abundance indicator for anadromous fish runs migrating past Zosel Dam and is not intended as an absolute census count. Okanogan Basin Monitoring and Evaluation Program collected fish passage data between October 2005 and December 2006. Video counting stations were deployed and data were collected at two locations in the basin: on the mainstem Okanogan River at Zosel Dam near Oroville, Washington, and on Bonaparte Creek, a tributary to the Okanogan River, in the town of Tonasket, Washington. Counts at Zosel Dam between 10 October 2005 and 28 February 2006 are considered partial, pilot year data as they were obtained from the operation of a single video array on the west bank fishway, and covered only a portion of the steelhead migration. A complete description of the apparatus and methodology can be found in 'Fish Enumeration Using Underwater Video Imagery - Operational Protocol' (Nass 2007). At Zosel Dam, totals of 57 and 481 adult Chinook salmon were observed with the video monitoring system in 2005 and 2006, respectively. Run

  6. The LNG Industry - 2004

    International Nuclear Information System (INIS)

    2005-04-01

    First estimates for the marketed production of natural gas in 2004 show a rise of about 2 % over 2003. The share of LNG in the gas trade accounts for 21.9 % of the total. This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2004, 3 - LNG imports - Sources of imports - Quantities received in 2005 by the importing countries from the exporting countries, 4 - LNG tankers, 5 - 21 Ships delivered in 2004, 6 - Tanker distribution (at the end of 2004), 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Long-term and medium-term contracts in force in 2004, 10 - Spot and short term quantities received in 2004 by the importing countries from the exporting countries, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  7. Institute of Nuclear Physics of Orsay - IPNO. Activity report 2004-2005

    International Nuclear Information System (INIS)

    2006-01-01

    The Institute of Nuclear Physics of Orsay (IPN Orsay) is undertaking nuclear physics research that is centered on the nature of matter and its ultimate constituents. By the nature of its scientific activities, the IPN is at the heart of a wide range of international collaborations. IPN Orsay is a unit of both the CNRS (National Centre of Scientific Research) and of the Paris-Sud University. It plays a vital role in experiments being carried out by wide-ranging collaborations at major experimental facilities most notably in Europe, the United States and Japan. Its own facilities allows the IPN to carry out fundamental theoretical and experimental research studies in nuclear physics, astro-particle physics, radiochemistry but also in pluri-disciplinary activities. This document presents the activity of the Institute during the 2004-2005 years: 1 - Scientific activities: Nuclear structure; Hadronic physics and matter; Astro-particles; Theoretical physics; Hot nuclei; Energy and Environment; Particle Matter Interactions; Physics-Biology-Medicine Interfaces in Neurobiology, Oncology and Genomic; Knowledge dissemination and communication; 2 - Technical activities: General and technical departments; Accelerators Division; 3 - Appendixes: Publications, Proceedings, Conferences, workshops, collaboration meetings, Internal seminars, External seminars, Heavy ions seminars, Theoretical seminars, Radiochemistry seminars, Seminars of general interest, Scientific events, Schools and lectures, Thesis, accreditations to supervise research, Books and works, 'Journal club', Staff, Visitors

  8. Financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B.; Decision and Information Sciences; Western Area Power Administration

    2010-04-21

    Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a ''without experiments'' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental

  9. Multi-point ground-based ULF magnetic field observations in Europe during seismic active periods in 2004 and 2005

    Directory of Open Access Journals (Sweden)

    G. Prattes

    2008-05-01

    Full Text Available We present the results of ground-based Ultra Low Frequency (ULF magnetic field measurements observed from June to August 2004 during the Bovec earthquake on 12 July 2004. Further we give information about the seismic activity in the local observatory region for an extended time span 2004 and 2005. ULF magnetic field data are provided by the South European Geomagnetic Array (SEGMA where the experience and heritage from the CHInese MAGnetometer (CHIMAG fluxgate magnetometer comes to application. The intensities of the horizontal H and vertical Z magnetic field and the polarization ratio R of the vertical and horizontal magnetic field intensity are analyzed taking into consideration three SEGMA observatories located at different close distances and directions from the earthquake epicenter. We observed a significant increase of high polarization ratios during strong seismic activity at the observatory nearest to the Bovec earthquake epicenter. Apart from indirect ionospheric effects electromagnetic noise could be emitted in the lithosphere due to tectonic effects in the earthquake focus region causing anomalies of the vertical magnetic field intensity. Assuming that the measured vertical magnetic field intensities are of lithospheric origin, we roughly estimate the amplitude of electromagnetic noise in the Earths crust considering an average electrical conductivity of <σ>=10−3 S/m and a certain distance of the observatory to the earthquake epicenter.

  10. Spokane Tribal Hatchery, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2005-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Fish produced by this project in 2004 to meet collective fish production and release goals included: 1,655,722 kokanee fingerlings, 537,783 rainbow trout fingerlings and 507,660 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to have a negative impact on adult kokanee returns and limits the

  11. The LNG Industry - 2005

    International Nuclear Information System (INIS)

    2006-04-01

    First estimates for the marketed production of natural gas in 2005 show a rise of about 1.5 % over 2004. The share of LNG in the gas trade accounts for almost 21 % of the total. This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2005, 3 - LNG imports - Sources of imports - Quantities received in 2005 by the importing countries from the exporting countries, 4 - LNG tankers, 5 - 18 Ships delivered in 2005, 6 - Tanker distribution, 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Long-term and medium-term contracts in force in 2005, 10 - Spot and short term quantities received in 2005 by the importing countries from the exporting countries, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  12. Police chief : homicide down, crime rate constant in 2004 / Aleksei Gunter

    Index Scriptorium Estoniae

    Gunter, Aleksei, 1979-

    2005-01-01

    Politseiameti teatel avastati 2004. aastal rekordarv kuritegusid. Politseiameti peadirektor Robert Antropov politseitööst ja ümberkorraldustest politseis 2004. aastal. Lisa: Politsei prioriteedid 2004 ja 2005 aastal

  13. Total 2004 results

    International Nuclear Information System (INIS)

    2005-02-01

    This document presents the 2004 results of Total Group: consolidated account, special items, number of shares, market environment, adjustment for amortization of Sanofi-Aventis merger-related intangibles, 4. quarter 2004 results (operating and net incomes, cash flow), upstream (results, production, reserves, recent highlights), downstream (results, refinery throughput, recent highlights), chemicals (results, recent highlights), Total's full year 2004 results (operating and net income, cash flow), 2005 sensitivities, Total SA parent company accounts and proposed dividend, adoption of IFRS accounting, summary and outlook, main operating information by segment for the 4. quarter and full year 2004: upstream (combined liquids and gas production by region, liquids production by region, gas production by region), downstream (refined product sales by region, chemicals), Total financial statements: consolidated statement of income, consolidated balance sheet (assets, liabilities and shareholder's equity), consolidated statements of cash flows, business segments information. (J.S.)

  14. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  15. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  16. Airborne thermal infrared imaging of the 2004-2005 eruption of Mount St. Helens

    Science.gov (United States)

    Schneider, D. J.; Vallance, J. W.; Logan, M.; Wessels, R.; Ramsey, M.

    2005-12-01

    A helicopter-mounted forward-looking infrared imaging radiometer (FLIR) documented the explosive and effusive activity at Mount St. Helens during the 2004-2005 eruption. A gyrostabilzed gimbal controlled by a crew member houses the FLIR radiometer and an optical video camera attached at the lower front of the helicopter. Since October 1, 2004 the system has provided an unprecedented data set of thermal and video dome-growth observations. Flights were conducted as frequently as twice daily during the initial month of the eruption (when changes in the crater and dome occurred rapidly), and have been continued on a tri-weekly basis during the period of sustained dome growth. As with any new technology, the routine use of FLIR images to aid in volcano monitoring has been a learning experience in terms of observation strategy and data interpretation. Some of the unique information that has been derived from these data to date include: 1) Rapid identification of the phreatic nature of the early explosive phase; 2) Observation of faulting and associated heat flow during times of large scale deformation; 3) Venting of hot gas through a short lived crater lake, indicative of a shallow magma source; 4) Increased heat flow of the crater floor prior to the initial dome extrusion; 5) Confirmation of new magma reaching the surface; 6) Identification of the source of active lava extrusion, dome collapse, and block and ash flows. Temperatures vary from ambient, in areas insulated by fault gouge and talus produced during extrusion, to as high as 500-740 degrees C in regions of active extrusion, collapse, and fracturing. This temperature variation needs to be accounted for in the retrieval of eruption parameters using satellite-based techniques as such features are sub-pixel size in satellite images.

  17. Vedelgaasi kasutamine Eestis 2005. aastal / Sandor Tabo

    Index Scriptorium Estoniae

    Tabo, Sandor

    2006-01-01

    2005. a. kasvas Eestis vedelgaasi tarbimine võrreldes 2004. aastaga 11%. Diagramm: Vedelgaasi tarbimine Eestis 2005. a. tonnides. Graafik: Vedelgaasi propaan maailmaturu hind USD/tonn. Tabel Eesti vedelgaasiäriühingute terminalide võimsuse ja müügiviiside kohta

  18. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  19. Above Bonneville passage and propagation cost effectiveness analysis

    International Nuclear Information System (INIS)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region

  20. Above Bonneville Passage and Propagation Cost Effectiveness Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

  1. Total 2004 results

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-02-01

    This document presents the 2004 results of Total Group: consolidated account, special items, number of shares, market environment, adjustment for amortization of Sanofi-Aventis merger-related intangibles, 4. quarter 2004 results (operating and net incomes, cash flow), upstream (results, production, reserves, recent highlights), downstream (results, refinery throughput, recent highlights), chemicals (results, recent highlights), Total's full year 2004 results (operating and net income, cash flow), 2005 sensitivities, Total SA parent company accounts and proposed dividend, adoption of IFRS accounting, summary and outlook, main operating information by segment for the 4. quarter and full year 2004: upstream (combined liquids and gas production by region, liquids production by region, gas production by region), downstream (refined product sales by region, chemicals), Total financial statements: consolidated statement of income, consolidated balance sheet (assets, liabilities and shareholder's equity), consolidated statements of cash flows, business segments information. (J.S.)

  2. Eesti maaelu arengukava 2004-2006 toetused / Ülle Puusta

    Index Scriptorium Estoniae

    Puusta, Ülle

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 71-72. Eesti maaelu arengukava meetmete rahastamisallikateks on EL-i eelarve (80%) ning Eesti riigieelarve (20%)

  3. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  4. Revised financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B.; Decision and Information Sciences; Western Area Power Administration, Colorado River Storage Project Management Center

    2011-01-11

    Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases

  5. Epidemiological and molecular surveillance of influenza and respiratory syncytial viruses in children with acute respiratory infections (2004/2005 season

    Directory of Open Access Journals (Sweden)

    Alessandra Zappa

    2008-03-01

    Full Text Available Objective. During the 2004/2005 influenza season an active virological surveillance of influenza viruses and respiratory syncytial virus (RSV was carried out to monitor the epidemiologic trend of acute respiratory infections (ARI in the paediatric community. Materials and methods. 100 patients (51 males, 49 females; mean age: 19 months, either treated at the Emergency Unit or hospitalized in the Pediatric Unit of “San Carlo Borromeo Hospital” (Milan, reporting symptoms related to ARI were enrolled. Pharyngeal swabs were collected for virological investigation by: 1 multiplexnested- PCR for the simultaneous identification of both influenza A and B viruses and RSV; 2 multiplex-nested- PCR for the subtyping of influenza A viruses (H1 and H3. Results. 12% (12/100 subjects were infected with influenza A virus, 4% (4/100 with influenza B virus and 14 (14% with RSV. Of all the 12 influenza A positive samples 4 (33.3% belonged to subtype H1 and 8 (66.7% to subtype H3. Bronchiolitis and bronchitis episodes were significantly higher among RSV-infected subjects than among influenza- infected subjects (42.8% vs 6.2%; p<0.05 and 35.7% vs 6.2%; p<0.05, respectively. Pneumonia episodes occurred similarly both in influenza-infected children and in RSV-infected ones. Conclusions. During the 2004/2005 influenza season, influenza viruses and RSV were liable for high morbidity among paediatric subjects.The present study underlies the importance of planning an active surveillance of respiratory viral infections among paediatric cases requiring hospitalization due to ARI.A thorough analysis of target population features, of viruses antigenic properties and seasonality will be decisive in the evaluation of each clinical event.

  6. AFSC/ABL: Lynn Canal Overwinter Acoustic Survey, 2004-2005

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The acoustic trawl database for Lynn Canals echo-trawl survey was conducted from 2001 to 2004 throughout southern Lynn Canal in southeast Alaska. Acoustic surveys...

  7. Evidence of deepwater spawning of fall chinook salmon (Oncorhynchus tshawytscha): spawning near Ives and Pierce Island of the Columbia River, 1999; ANNUAL

    International Nuclear Information System (INIS)

    Mueller, Robert P.; Dauble, Dennis D.

    2000-01-01

    Fall chinook salmon Oncorhynchus tshawytscha, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by Washington Department of Fisheries and Wildlife (WDFW) biologists in 1993 (Hymer 1997). Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and Ives island. Limited spawning ground surveys were conducted in the area around Ives and Pierce Islands during 1994-1997 and based on these surveys it was believed that fall chinook salmon successfully spawned in this area. The size of this population from 1994 to 1996 was estimated at 1,800 to 5,200 fish (Hymer 1997). Recently, chum salmon were also documented spawning downstream of Bonneville Dam. Chum salmon O. kisutch were listed as threatened under the Endangered Species Act (ESA) in March, 1999. There are several ongoing investigations to define the physical habitat characteristics associated with fall chinook and chum salmon spawning areas downstream of Bonneville Dam. A major concern is to determine what flows (i.e. surface elevations) are necessary to ensure their long-term survival. Our objective was to locate deepwater spawning locations in the main Columbia River channel and to collect additional data on physical habitat parameters at the site. This objective is consistent with the high priority that the Northwest Power Planning Council's Independent Advisory Board and the salmon managers have placed on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin

  8. Annual report of R and D activities in center for promotion of computational science and engineering from April 1, 2004 to March 31, 2005

    International Nuclear Information System (INIS)

    2005-09-01

    This report provides an overview of research and development activities in Center for Promotion of Computational Science and Engineering (CCSE), JAERI, in the fiscal year 2004 (April 1, 2004 - March 31, 2005). The activities have been performed by Research Group for Computational Science in Atomic Energy, Research Group for Computational Material Science in Atomic Energy, R and D Group for Computer Science, R and D Group for Numerical Experiments, and Quantum Bioinformatics Group in CCSE. The ITBL (Information Technology Based Laboratory) project is performed mainly by the R and D Group for Computer Science and the Research Group for Computational Science in Atomic Energy. According to the mid-term evaluation for the ITBL project conducted by the MEXT, the achievement of the ITBL infrastructure software developed by JAERI has been remarked as outstanding at the 13th Information Science and Technology Committee in the Subdivision on R and D Planning and Evaluation of the Council for Science and Technology on April 26th, 2004. (author)

  9. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  10. Alberta's reserves 2004 and supply/demand outlook 2005-2014

    International Nuclear Information System (INIS)

    Burrowes, A.; Marsh, R.; Ramdin, N.; Evans, C.; Kirsch, M.A.; Philp, L.; Fujda, M.; Stenson, J.; Sadler, K.; Sankey, G.; Hill, C.; Rahnama, F.; Habib, G.; MacGillivray, J.

    2005-01-01

    This document presents information on the state of reserves, supply, and demand for Alberta's energy resources including bitumen, crude oil, coalbed methane (CBM), conventional natural gas, natural gas liquids, sulphur, and coal. Estimates of initial reserves, remaining established reserves, and ultimate potential were also included, along with a 10-year supply and demand forecast for Alberta's energy resources. The document presents major forecast assumptions that influence Alberta's energy supply and demand. Some of the main variables affecting energy supply and demand include the global oil market, energy prices, Canadian economic performance and the economic outlook for Alberta. The development of Alberta's energy resources depends on reserve supply, costs of development, energy demands, conservation, and social, economic and environmental considerations. In 2004, raw bitumen production continued to grow and accounted for 69 per cent of Alberta's total crude oil and bitumen production. The value-added process of upgrading raw bitumen to synthetic crude oil was also expanded in 2004. Natural gas production from all sources in Alberta increased by 1 per cent compared with 2003. CBM development also increased greatly in 2004. Although it accounted for 80 per cent of the cumulative CBM production to date, it only contributed 0.5 per cent of the provincial total natural gas production. It is expected that CBM development will continue to increase in the coming years. For that reason, a separate estimate of CBM reserves was included. tabs., figs

  11. Bonneville Power Administration: financial fallout from termination of WPPSS nuclear projects 4 and 5. Oversight hearings before the Subcommittee on Mining, Forest Management, and Bonneville Power Administration of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Eighth Congress, First Session, February 14 and 15, 1983

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Peter T. Johnson, Administrator of the Bonneville Power Administration, and a representative of the Washington Public Power Supply System (WPPSS) described the financial situation resulting from the cancellations and cost overruns of WPPSS nuclear projects that have left the area with an unacceptable debt. Four panels representing area utilities and electric cooperatives described their financial positions on the second day of hearings. Two appendices with additional material from Bonneville, WPPSS, the Department of the Interior, and others follow the testimony

  12. Importance of using roller compacted concrete in techno-economic investigation and design of small dams

    Science.gov (United States)

    Rouissat, Bouchrit; Smail, N.; Zenagui, S.

    2017-12-01

    In recent years, and under constraints caused by persistent drought, Algeria has launched a new mobilization strategy for surface water resources from small and medium dams. However, by making a review of the studies and achievements of twenty small dams in the west of Algeria, some deficiencies appeared. In addition to reservoir siltation assessment, operation spillways have been the major constraint on the reliability of these types of dams. The objective of this paper is to use the roller compacted concrete (RCC) for small dams' design for the benefit it offers and its ability to incorporate spillways. The development of this reflection was applied to the Khneg Azir earth dam situated in southwest of Algeria. Its uncontrolled lateral spillway has registered significant damage following the flood of October 2005, amounted, at that time, to more than 100 million Algerian dinars (1 million US Dollars). The present research encompasses a technical and economical comparative analysis concerning multiple criteria dam design types coupled with the conjugation of the spillways. Thus, on the basis of financial estimates calculated for all design types, the variant RCC remains competitive with that of the earth dam's spillway isolated (Less than 40% of the cost). To assess the mechanical behavior of the foundations for both types of dams, (earth and RCC dams), numerical modeling has been undertaken, according to the comparative analysis of deformations in the foundations. Analysis of deformations showed that the average foundation deformations was between (0.052-0.85) m for earth dam and (0.023-0.373) m for RCC dam. These economical and technical considerations open up important prospects for the use of RCC in the design of small dams.

  13. FY 2005 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The Supplement to the President`s FY 2005 Budget reports on the FY 2004 research and development R and D activities and FY 2005 plans of the multiagency Networking...

  14. Fuel use and emissions from non-road machinery in Denmark from 1985-2004 - and projections from 2005-2030

    International Nuclear Information System (INIS)

    Winther, M.; Nielsen, Ole-Kenneth

    2006-01-01

    This report documents the updated 1985-2004 fuel use and emission inventory for non road machinery and recreational craft in Denmark. The inventory comprises the emission components of SO 2 , NO x , NMVOC, CH 4 , CO, CO 2 , N 2 O, NH 3 and TSP, and in addition a fuel use and emission forecast is presented from 2005-2030. The calculated results are grouped into the sub-sectors agriculture, forestry, industry, household/gardening and inland waterways, according to the structure of the CollectER database used for all Danish sources. The report explains the existing EU emission directives for non road machinery, the actual fuel use and emission factors used, sources of background and operational data, calculation methods and the calculated fuel use and emission results. (au)

  15. Monitoring of downstream salmon and steelhead at Federal hydroelectric facilities. Annual report 1993

    International Nuclear Information System (INIS)

    Wood, L.A.; Martinson, R.D.; Graves, R.J.; Carroll, D.R.; Killins, S.D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis

  16. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  17. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  18. Births: preliminary data for 2005.

    Science.gov (United States)

    Hamilton, Brady E; Martin, Joyce A; Ventura, Stephanie J

    2006-12-28

    This report presents preliminary data for 2005 on births in the United States. U.S. data on births are shown by age, live-birth order, race, and Hispanic origin of mother. Data on marital status, cesarean delivery, preterm births, and low birthweight (LBW) are also presented. Data in this report are based on 99.2 percent of births for 2005. The records are weighted to independent control counts of all births received in state vital statistics offices in 2005. Comparisons are made with 2004 data. The crude birth rate in 2005 was 14.0 births per 1,000 total population, unchanged from 2004. The general fertility rate, however, rose to 66.7 births per 1,000 women aged 15-44 years in 2005, the highest level since 1993. The birth rate for teenagers declined by 2 percent in 2005, falling to 40.4 births per 1,000 women aged 15-19 years, the lowest ever recorded in the 65 years for which a consistent series of rates are available. The rate declined for teenagers 15-17 years to 21.4 births per 1,000, but was essentially stable for older teenagers 18-19 years. The birth rate for women aged 20-24 years rose in 2005, whereas the rate for women aged 25-29 years was essentially unchanged. The birth rates for women aged 30 years and over rose to levels not seen in almost 40 years. Childbearing by unmarried women increased to record levels for the Nation in 2005. The birth rate rose 3 percent to 47.6 births per 1,000 unmarried women aged 15-44 years; the proportion of all births to unmarried women increased to 36.8 percent. The cesarean delivery rate rose by 4 percent in 2005 to 30.2 percent of all births, another record high for the Nation. The preterm birth rate continued to rise (to 12.7 percent in 2005) as did the rate for LBW births (8.2 percent).

  19. k0-INAA for APM samples collected in period of June 2004 - March 2005 and some marine certified reference materials

    International Nuclear Information System (INIS)

    Dung, Ho Manh; Vu, Cao Dong; Y, Truong; Sy, Nguyen Thi

    2006-01-01

    The airborne particulate matter (APM) samples have been collected in 2004 using two types of polycarbonate membrane filter PM 2.5 and PM 2.5-10 at two sites of industrial (Ho Chi Mihn City) and rural (Dateh) regions in south of Vietnam. Three marine certified reference materials have been selected to establish a k0-NAA procedure for marine samples. The concentration of trace multi-element in the samples has been determined by the k 0 -INAA procedure using K o -DALAT software developed in Dalat NRI. About 28 elements in 224 APM samples collected at two areas of Dateh and HCMC of Vietnam in period from June, 2004 to March, 2005 were presented in report. The statistical analysis was applied to the data set to investigate the pollution source at sampling sites. The results proved that the k 0 -NAA on the Dalat research reactor is a reliable and effective analytical technique for characterization of trace multi-element in APM and marine samples for air and marine environmental pollution study in Vietnam. (author)

  20. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  1. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  2. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  3. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  4. Oceanographic water temperature and salinity profiles from CTD casts collected aboard the Navigation Response Team 6 in the Pacific Ocean from 2004-10-07 to 2005-07-19 (NODC Accession 0002666)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Temperature profile data were collected using CTD casts in the Northeast Pacific Ocean from the NAVIGATION RESPONSE TEAM 6 from 07 October 2004 to 19 July 2005. Data...

  5. Late Pleistocene Hansel Valley basaltic ash, northern Lake Bonneville, Utah, USA

    Science.gov (United States)

    Miller, D.M.; Oviatt, Charles G.; Nash, B.P.

    2008-01-01

    The Hansel Valley ash bed lies within 5 cm of the base of deposits of Lake Bonneville (???28 ka) in the vicinity of Great Salt Lake and provides a useful stratigraphic marker for this area of the lake basin. However, it has not been matched to an eruptive edifice, presumably because such an edifice was eroded by waves of Lake Bonneville. We present data for the chemical composition of the tephra and for possible matching lavas and tephras of the region, as well as grain size data for the tephra in an attempt to identify the location of the eruption. Matches with other tephras are negative, but lavas near the coarsest ash deposits match well with the distinctive high values of TiO2 and P2O5 of the ash. Neither chemistry nor grain size data points uniquely to a source area, but an area near the northwest shore of Great Salt Lake and within Curlew Valley is most likely. The Hansel Valley ash is an example of an ash that has no direct numerical date from proximal deposits, despite considerable study, yet nonetheless is useful for stratigraphic studies by virtue of its known stratigraphic position and approximate age. Basaltic tephras commonly are not as widespread as their rhyolitic counterparts, and in some cases apparently are produced by eruptive sources that are short lived and whose edifices are not persistent. ?? 2007 Elsevier Ltd and INQUA.

  6. Report of the IAEA Nuclear Data Section to the International Nuclear Data Committee for the period January 2004 - December 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, A L [International Atomic Energy Agency, Nuclear Data Section, Vienna (Austria)

    2006-05-15

    This report contains details of the main activities of the IAEA Nuclear Data Section (NDS) in 2004 and 2005, as information to the International Nuclear Data Committee (INDC). Work of NDS staff and their consultants has focused on the continued data development and ensuring adequate, trouble-free services to all users in Member States. This information is complemented with descriptions of other related activities in the reporting period, including meetings and publications. The atomic and molecular data programmes are presented to the INDC for their information only, since these specific activities are reviewed in depth by the A+M Subcommittee of the International Fusion Research Council. (author)

  7. Report of the IAEA Nuclear Data Section to the International Nuclear Data Committee for the period January 2004 - December 2005

    International Nuclear Information System (INIS)

    Nichols, A.L.

    2006-05-01

    This report contains details of the main activities of the IAEA Nuclear Data Section (NDS) in 2004 and 2005, as information to the International Nuclear Data Committee (INDC). Work of NDS staff and their consultants has focused on the continued data development and ensuring adequate, trouble-free services to all users in Member States. This information is complemented with descriptions of other related activities in the reporting period, including meetings and publications. The atomic and molecular data programmes are presented to the INDC for their information only, since these specific activities are reviewed in depth by the A+M Subcommittee of the International Fusion Research Council. (author)

  8. Status of air quality in arenas in the Abitibi-Temiscamingue 2004-2005

    International Nuclear Information System (INIS)

    Gagne, D.

    2005-01-01

    The air quality was checked in 24 of 26 arenas in Quebec's Abitibi-Temiscamingue region during the intensive tournament season from November 2004 to March 2005. Carbon monoxide (CO) levels were measured in 24 arenas, while nitrogen dioxide (NO 2 ) levels were measured in 22 arenas during and after intensive use of the ice surfacing machine. The air quality respected the public health criteria for CO and NO 2 in 87 and 95 per cent of the arenas, respectively. The main factors that influence the ambient air quality in the arenas included the maintenance of the ice surfacing machine, the system of radiant heating and ventilation of combustion gases. In more than half of the arenas, the ice surfacing machine had been tuned prior to the active season. In 28 per cent of the arenas, maintenance inspections were carried out only twice during the season. Two arenas were equipped with an electric ice surfacing machine. All arenas had a mechanical ventilation system. It was concluded that the proportion of arenas that do not respect public health criteria at the time of monitoring varied between 4 and 23 per cent. While the negligence of operators is often in question, the failures of ventilation systems or a contamination by external sources of CO are often unforeseeable. For these reasons, it was recommended that annual monitoring should be conducted by an external organization. 9 refs., 7 figs.

  9. Academic Training: 2004 - 2005 ACADEMIC TRAINING PROGRAMME

    CERN Multimedia

    Françoise Benz

    2004-01-01

    1st Term - 01 October to 17 December 2004 REGULAR LECTURE PROGRAMME New Trends in Fusion Research by A. Fasoli, EPFL, Lausanne, CH 11, 12, 13 October Physics at e+e- linear collider by K. Desch, DESY, Hamburg, D 15, 16, 17, 18, 19 November LECTURE SERIES FOR POSTGRADUATE STUDENTS Standard Model by R. Barbieri, CERN-PH-TH 6, 7, 8, 9 10 December The lectures are open to all those interested, without application. The abstract of the lectures, as well as any change to the above information (title, dates, time, place etc) will be published in the CERN Bulletin, the WWW, and by notices before each term and for each series of lectures.

  10. La fiscalización sin dientes en el gobierno del estado de Sonora 2004 y 2005

    Directory of Open Access Journals (Sweden)

    Nicolás Pineda Pablos

    2011-01-01

    Full Text Available Este trabajo aborda dos temas relacionados con la revisión de las cuentas públicas de la administración directa dependiente del ejecutivo del estado de Sonora. Uno es indagar qué tantas faltas o deficiencias se encuentran en la revisión de las cuentas públicas y cómo se hacen las observaciones y señalamientos. El segundo es ver si, en los casos de las observaciones, se aplican sanciones y si se busca reparar el daño. Para ello, se analizaron las observaciones de los informes de resultados de los años 2004 y 2005 y se indagó sobre los procedimientos de solventación y sanciones aplicadas. El estudio arroja que hay deficiencias serias en la de rendición de cuentas y que es vaga y difusa a la hora de resolver las deficiencias y de la aplicación de sanciones.

  11. INJURY PROFILE IN WOMEN SHOTOKAN KARATE CHAMPIONSHIPS IN IRAN(2004-2005

    Directory of Open Access Journals (Sweden)

    Farzin Halabchi

    2007-10-01

    Full Text Available The aims of this paper were to record injury rates among Iranian women competitive Shotokan karate athletes and propose possible predisposing factors. A prospective recording of the injuries resulting from all matches in 6 consecutive women national Shotokan Karate Championships in all age groups in Iran (season 2004-2005 was performed. Data recorded included demographic characteristics (Age and Weight, athletic background (rank, years of experience, time spent training and previous injuries, type, location and reason for the injury, and the result of the match. Results indicate 186 recorded injuries from a total of 1139 bouts involving 1019 athletes, therefore there were 0.163 injury per bout [C.I. 95%: 0.142-0.184] and 183 injuries per 1000 athletes [C.I. 95%: 159-205]. Injuries were most commonly located in the head and neck (55.4% followed by the lower limb (21%, upper limb (12.9% and trunk (10.8%. Punches (48. 4% were associated with more injuries than kicks (33.3%. The injuries consisted of muscle strain and contusion (81, 43.6%, hematoma and epistaxis (49, 26.3%, lacerations and abrasions (28, 15. 1%, concussion (13, 7%, tooth avulsion or subluxation (3, 1.6%, joint dislocation (3, 1.6% and fractures (3, 1.6%. In conclusion, as the majority of injuries are minor, and severe or longstanding injuries are uncommon, it can be argued that shotokan karate is a relatively safe for females, despite its image as a combat sport, where ostensibly the aim appears to injure your opponent. Further research is needed to evaluate the effective strategies to minimize the risk of injuries

  12. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  13. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  14. Climate Change Impacts on Water and Energy for Army Installations

    Science.gov (United States)

    2015-09-01

    CO; Houston, TX; Santa Fe, NM, Salt Lake City, UT; Carson City and Los Vegas, NV; and San Fran- cisco , CA (Melillo, Richmond, and Yohe 2014). This...United States, have already affected the Bonneville Power Administration (BPA). BPA markets electric power from the Bonneville Dam located on the...the electricity generated in the Electricity Market Module (EMM) region* and therefore this work’s forecast of the increase in future electricity gen

  15. Fuel use and emissions from non-road machinery in Denmark from 1985-2004 - and projections from 2005-2030

    Energy Technology Data Exchange (ETDEWEB)

    Winther, M.; Nielsen, Ole-Kenneth [National Environmental Research Inst. (Denmark)

    2006-08-31

    This report documents the updated 1985-2004 fuel use and emission inventory for non road machinery and recreational craft in Denmark. The inventory comprises the emission components of SO{sub 2}, NO{sub x}, NMVOC, CH{sub 4}, CO, CO{sub 2}, N{sub 2}O, NH{sub 3} and TSP, and in addition a fuel use and emission forecast is presented from 2005-2030. The calculated results are grouped into the sub-sectors agriculture, forestry, industry, household/gardening and inland waterways, according to the structure of the CollectER database used for all Danish sources. The report explains the existing EU emission directives for non road machinery, the actual fuel use and emission factors used, sources of background and operational data, calculation methods and the calculated fuel use and emission results. (au)

  16. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  17. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  18. Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2005-10-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River

  19. Report: Audit of EPA’s Fiscal 2005 and 2004 Consolidated Financial Statements

    Science.gov (United States)

    Report #2006-1-00015, November 14, 2005. EPA converted to a new payroll system in fiscal 2005. While EPA was able to resolve many issues arising from the conversion, we noted several reportable conditions.

  20. Academic Training: 2004 - 2005 ACADEMIC TRAINING PROGRAMME

    CERN Multimedia

    Françoise Benz

    2004-01-01

    1st Term - 01 October to 17 December 2004 REGULAR LECTURE PROGRAMME New Trends in Fusion Research by A. Fasoli, EPFL, Lausanne, CH 11, 12, 13 October Physics at e+e- linear collider by K. Desch, DESY, Hamburg, D 15, 16, 17, 18, 19 November LECTURE SERIES FOR POSTGRADUATE STUDENTS Standard Model by R. Barbieri, CERN-PH-TH 6, 7, 8, 9 10 December The lectures are open to all those interested, without application. The abstract of the lectures, as well as any change to the above information (title, dates, time, place etc) will be published in the CERN Bulletin, the WWW, and by notices before each term and for each series of lectures. ENSEIGNEMENT ACADEMIQUE ACADEMIC TRAINING Françoise Benz 73127 academic.training@cern.ch

  1. John Maynard Smith (1920-2004)

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 10; Issue 11. John Maynard Smith (1920-2004) - “One of the last Grand Evolutionary Theorists of the 20th Century”. Vidyanand Nanjundiah. General Article Volume 10 Issue 11 November 2005 pp 70-78 ...

  2. A multi-year analysis of spillway survival for juvenile salmonids as a function of spill bay operations at McNary Dam, Washington and Oregon, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Hansel, Hal C.; Perry, Russell W.; Evans, Scott D.

    2012-01-01

    We analyzed 6 years (2004-09) of passage and survival data collected at McNary Dam to examine how spill bay operations affect survival of juvenile salmonids passing through the spillway at McNary Dam. We also examined the relations between spill bay operations and survival through the juvenile fish bypass in an attempt to determine if survival through the bypass is influenced by spill bay operations. We used a Cormack-Jolly-Seber release-recapture model (CJS model) to determine how the survival of juvenile salmonids passing through McNary Dam relates to spill bay operations. Results of these analyses, while not designed to yield predictive models, can be used to help develop dam-operation strategies that optimize juvenile salmonid survival. For example, increasing total discharge typically had a positive effect on both spillway and bypass survival for all species except sockeye salmon (Oncorhynchus nerka). Likewise, an increase in spill bay discharge improved spillway survival for yearling Chinook salmon (Oncorhynchus tshawytscha), and an increase in spillway discharge positively affected spillway survival for juvenile steelhead (Oncorhynchus mykiss). The strong linear relation between increased spill and increased survival indicates that increasing the amount of water through the spillway is one strategy that could be used to improve spillway survival for yearling Chinook salmon and juvenile steelhead. However, increased spill did not improve spillway survival for subyearling Chinook salmon and sockeye salmon. Our results indicate that a uniform spill pattern would provide the highest spillway survival and bypass survival for subyearling Chinook salmon. Conversely, a predominantly south spill pattern provided the highest spillway survival for yearling Chinook salmon and juvenile steelhead. Although spill pattern was not a factor for spillway survival of sockeye salmon, spill bay operations that optimize passage through the north and south spill bays maximized

  3. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  4. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  5. Market Participation in the Age of Big Dams: The Belo Monte Hydroelectric Dam and Its Impact on Rural Agrarian Households

    Directory of Open Access Journals (Sweden)

    Aniseh S. Bro

    2018-05-01

    Full Text Available With rapid population growth comes the ever-important task of meeting the energy demand that this growth requires, and many of the world’s tropical regions have turned to hydropower to address the challenges associated with increasing energy consumption. Hydropower is an important energy policy issue in Brazil, and it is promoted as the preferred electricity option, because it is the least expensive in terms of long-term returns on investment; the Belo Monte dam in Northern Brazil provides an opportunity to study the effects of large investments in hydroelectric infrastructure on the surrounding local population. Using a matched panel data spanning 10 years (2005 to 2015, we study the impacts of Brazil’s Belo Monte dam on cocoa and other food crop producers in the region. We find that households have seen a decline in rural employment opportunities, and despite improvements in cocoa productivity households have experienced declining food production. With the construction of the dam largely completed, farmers must now face the challenges of decreased food access and shifts in employment opportunities, and while there are many advantages and opportunities associated with this new development, special policy considerations are necessary to ensure that there are safety nets in place to assist those who will see a decline in access to economic opportunities.

  6. Bonneville Power Administration 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  7. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  8. Proceedings of the Topical Sessions on Media Relations held in June 2004 and 2005

    International Nuclear Information System (INIS)

    2006-01-01

    An effective media strategy, including timely interaction with them is an indispensable tool for organisations or institutions involved in radioactive waste management. With this in mind, the Forum on Stakeholder Confidence (FSC) set up a Group on Communication and Outreach with a twofold objective: to assist FSC members in communicating with the radioactive waste management community, to assist FSC members in reaching a broader public. As part of this assignment, the Group organised two Topical Sessions on media strategy, in conjunction with the 2004 and 2005 FSC meetings. The main objective was to learn about the functioning of the media organisations, their structures and needs, with speakers chosen to represent the range of such media, as well as different countries and varying radioactive waste situations that may serve as illustrative examples, given the vast differences that may prevail between local, national, and international radioactive waste management situations and their treatment by the media. The sessions were attended by representatives of policy makers, regulators and implementers from the FSC organisations. The presentations and discussions illustrated current media strategies, best practices, successes and failures and lessons learn. These proceedings consist of a summary of the main points made by each speaker as well a collation of their papers

  9. G8 global partnership. 2004-2005-2006 activity report; Partenariat mondial du G8. Rapport d'activite 2004-2005-2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The Global Partnership Against the Spread of Weapons and Materials of Mass Destruction was launched by the heads of state and government of the G8 at the G8 summit in Kananaskis in June 2002. Fourteen other countries have since joined this G8 initiative. The aim of this partnership is to 'prevent terrorists, or those who harbor them, from acquiring or developing nuclear, chemical radiological and biological weapons, missiles, and related materials, equipment and technology'. Within the framework of the Partnership, the participants have agreed to support cooperation projects, starting with Russia, to promote non-proliferation, disarmament, the fight against terrorism and nuclear safety. The destruction of chemical weapons, the dismantling of decommissioned nuclear submarines, the disposal of fissile materials and the employment of former weapons scientists are among the priority concerns expressed. Ukraine has also been a beneficiary of this partnership since 2004. The participants in this initiative have agreed to contribute up to 20 billion dollars (up to 750 million euros from France) to support these projects over a period of ten years from 2002. A group of experts from the G8 on the Global Partnership (the GPWG = Global Partnership Working Group) meets regularly and gives an account of the progress made with this initiative in its annual report to the G8. These annual reports are published at the G8 summits. This document is the 2004 to 2006 activity report of the G8 global partnership.

  10. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zabel, Richard; Williams, John G.; Smith, Steven G. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2002-06-01

    In 2001, the National Marine Fisheries Service and the University of Washington completed the ninth year of a study to estimate survival and travel time of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from passive integrated transponder (PIT)-tagged fish. We PIT tagged and released at Lower Granite Dam a total of 17,028 hatchery and 3,550 wild steelhead. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream of the hydropower system and sites within the hydropower system. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using the Single-Release Model. Primary research objectives in 2001 were to: (1) estimate reach and project survival and travel time in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations; (2) evaluate relationships between survival estimates and migration conditions; and (3) evaluate the survival-estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2001 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures with a minimum of text. More details on methodology and statistical models used are provided in previous reports cited in the text. Results for summer-migrating chinook salmon will be reported separately.

  11. Status of air quality in arenas in the Abitibi-Temiscamingue 2004-2005; Portrait de la qualite de l'air dans les arenas de l'Abitibi-Temiscamingue 2004-2005

    Energy Technology Data Exchange (ETDEWEB)

    Gagne, D. (ed.)

    2005-09-13

    The air quality was checked in 24 of 26 arenas in Quebec's Abitibi-Temiscamingue region during the intensive tournament season from November 2004 to March 2005. Carbon monoxide (CO) levels were measured in 24 arenas, while nitrogen dioxide (NO{sub 2}) levels were measured in 22 arenas during and after intensive use of the ice surfacing machine. The air quality respected the public health criteria for CO and NO{sub 2} in 87 and 95 per cent of the arenas, respectively. The main factors that influence the ambient air quality in the arenas included the maintenance of the ice surfacing machine, the system of radiant heating and ventilation of combustion gases. In more than half of the arenas, the ice surfacing machine had been tuned prior to the active season. In 28 per cent of the arenas, maintenance inspections were carried out only twice during the season. Two arenas were equipped with an electric ice surfacing machine. All arenas had a mechanical ventilation system. It was concluded that the proportion of arenas that do not respect public health criteria at the time of monitoring varied between 4 and 23 per cent. While the negligence of operators is often in question, the failures of ventilation systems or a contamination by external sources of CO are often unforeseeable. For these reasons, it was recommended that annual monitoring should be conducted by an external organization. 9 refs., 7 figs.

  12. Beach morphology monitoring in the Elwha River Littoral Cell, 2004-2009

    Science.gov (United States)

    Warrick, Jonathon A.; George, Douglas A.; Stevens, Andrew W.; Eshleman, Jodi; Gelfenbaum, Guy; Kaminsky, George M.; Schwartz, Andrew K.; Bierne, Matt

    2007-01-01

    This report describes the methods used, data collected, and results of the Beach Morphology Monitoring Program in the Elwha River Littoral Cell, starting in 2004. The U.S. Geological Survey and the Washington State Department of Ecology collaborated in the data collection with the support of the local Lower Elwha Klallam Tribe. Beach monitoring efforts consisted of collecting topographic and bathymetric horizontal and vertical position data by using a Real Time Kinematic Differential Global Positioning System (RTK-DGPS). The monitoring program was designed to characterize the littoral system of the Elwha River before the scheduled removal of two large dams in 2012. A primary objective of this work is to quantitatively describe the topography and bathymetry of the Elwha River littoral system so that the effects of dam removal may be quantified. Sediment inputs following dam removal are hypothesized to result in (A) larger amounts of fine sediment grain-sizes entering the littoral system and, (B) a reduction or reversal of coastal erosion.

  13. Teraviljatoodete tootmine, tarbimine ja kaubandus : [1994-2004 Eestis] / Taavi Kuntu

    Index Scriptorium Estoniae

    Kuntu, Taavi

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 34-41. Teravilja, teraviljasaadusi ja muid toiduaineid töötlev tööstus annab väärtuseliselt ligikaudu 18% Eesti toiduainetööstuse kogutoodangust. Diagrammid. Tabel

  14. Umatilla River Subbasin Fish Habitat Improvement Program, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-05-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat conditions. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, through the restoration of stable channel function. This report provides a summary of Program activities for the 2005 calendar year (January 1 through December 31, 2005), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance (O&M), and (4) Monitoring and Evaluation (M&E). This report also summarizes activities associated with Program Administration, Interagency Coordination, and Public Education.

  15. Resultados econômicos da atividade leiteira na região de Lavras (MG nos anos 2004 e 2005: um estudo multicasos Economical results of milk production systems in Lavras region (MG throughout the years 2004 and 2005: a multicase study

    Directory of Open Access Journals (Sweden)

    M.A. Lopes

    2008-04-01

    Full Text Available Estudou-se a rentabilidade da atividade leiteira de 17 propriedades da região de Lavras/MG e identificaram-se os componentes que exerceram maior influência sobre os custos finais da atividade. Os dados foram coletados mensalmente durante o período de janeiro de 2004 a dezembro de 2005. Considerou-se a margem bruta, a margem líquida e o resultado (lucro ou prejuízo como indicadores de eficiência econômica. Os itens componentes do custo operacional efetivo que exerceram maior influência sobre os custos da atividade leiteira foram, em ordem decrescente, alimentação (55,9%, mão-de-obra (19,1%, despesas diversas (11,3%, energia (7,1%, sanidade (4,9%, ordenha (0,74%, impostos (0,74% e inseminação artificial (0,23%. A margem líquida e o resultado positivo indicam que os pecuaristas têm condições de produzir a médio e a longo prazo, com conseqüente capitalização. Os resultados do estudo não podem ser extrapolados por não se tratar de uma amostra probabilística.It was studied the profitability of the milk production in 17 properties in the region of Lavras (MG, and the components that had the greatest influence on the final costs of the business were identified. The data were monthly collected from January 2004 to December 2005. The gross margin, net margin, and the result (profit or loss were taken into consideration as indicators of economic efficiency. The component items of the effective operational cost that had the greatest influence upon the costs of dairy business were, in decreasing order, feeding (55.9%, labor (19.1%, different expenses (11.3%, energy (7.1%, health (4.9%, milking (0.74%, taxes (0.74%, and artificial insemination (0,23%. The net margin and the positive result show the farmers have conditions to produce in middle and long terms, with consequent capitalization. Although, the results of the study can not be extrapolated, since they do not represent a random sampling.

  16. Modeling lost production from destroyed platforms in the 2004-2005 Gulf of Mexico hurricane seasons

    International Nuclear Information System (INIS)

    Kaiser, Mark J.; Yu, Yunke; Jablonowski, Christopher J.

    2009-01-01

    Hurricanes Ivan, Katrina, and Rita passed through the Gulf of Mexico during 2004 and 2005 and resulted in the largest number of destroyed and damaged offshore oil and gas structures in the history of Gulf operations. In the final official government assessment, a total of 126 platforms were destroyed and over 183 structures were identified as having extensive damage. Production associated with wells and structures that are not redeveloped are classified as lost. The purpose of this paper is to derive functional relations that describe the likely contribution the collection of destroyed assets would have made to future production in the Gulf of Mexico. We estimate that the total remaining reserves from the set of destroyed structures range in value between 1.3 and 4.5 billion depending on the assumptions employed. We summarize the impact of the storms on the Gulf of Mexico oil and gas infrastructure and discuss the main issues involved in redevelopment decision making. A meta-model analytic framework is applied to perform sensitivity analysis and to explore the interactions of assumptions on model output. A discussion of the limitations of the analysis is presented. (author)

  17. CFBP and LPG market in 2004

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The French butane and propane committee (CFBP) has presented its activities in liquefied petroleum gases in its 2004 annual report. The success of its initiatives of promotion during the year 2004 has led the CFBP to launch a new campaign of advertisement since January 31, 2005. In its report, the CFBP stresses on the re-start up of the LPG fuel market. The sales of propane gas in tanks have raised by 5.2% between 2003 and 2004. The decay of the traditional market of gas cylinders has been practically stopped thanks to the sales dynamism of small (5-6 kg) cylinders and to the innovations added by some retailers on the 13 kg cylinders (level indicator). The sales of automotive LPG fuels have shown a slower decay during 2004. (J.S.)

  18. Technical Cooperation Report for 2004. Report by the Director General; Informe de Cooperacion Tecnica para 2004. Informe del Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-08-15

    The Technical Cooperation Report for 2004 highlights activities and achievements of the technical cooperation programme for the past year. During 2004, the Secretariat finalized the technical cooperation programme for the 2005-2006 biennium, which was approved by the Board of Governors in November 2004. A revised project appraisal process was carried out for the 2005-2006 programme, which yielded additional information regarding government commitment, national capabilities and project performance indicators and outcomes. Included in the 2005-2006 biennium is a strengthened programme for upgrading radiation protection infrastructure. The Secretariat used the experience of the past ten years, as well as conclusions from evaluations, to create a programme that would build upon the successes and lessons learned to provide the safe use of nuclear technology with well-regulated infrastructures. Activities carried out in 2004 built upon previous achievements through national and regional projects in many thematic areas. The programme continued to reinforce the capacity for cancer diagnosis and therapy by providing training and expertise and supporting the procurement of equipment. Consistent support for surveillance techniques using nuclear technology is helping to fight trans-boundary animal diseases, and is leading to countries becoming rinderpest-free. The Secretariat continued to provide expertise and support to assist with the repatriation of highly enriched uranium reactor fuel to the country of origin. The development of partnerships with other United Nations organizations, as well as non-governmental organizations, continues to be of great importance to the technical cooperation programme. In 2004, for example, a memorandum of understanding was signed with the Regional Office for Africa (AFRO) of the World Health Organization (WHO) to support the improvement of health conditions and to raise standards of health in the region. Extrabudgetary resources reached more

  19. Spatial and temporal variability in nutrients and carbon uptake during 2004 and 2005 in the eastern equatorial Pacific Ocean

    DEFF Research Database (Denmark)

    Palacz, A. P.; Chai, F.

    2012-01-01

    The eastern equatorial Pacific plays a great role in the global carbon budget due to its enhanced biological productivity linked to the equatorial upwelling. However, as confirmed by the Equatorial Biocomplexity cruises in 2004 and 2005, nutrient upwelling supply varies strongly, partly due...... and intraseasonal time scales. Here, high resolution Pacific ROMS-CoSiNE (Regional Ocean Modeling System-Carbon, Silicon, Nitrogen Ecosystem) model results were evaluated with in situ and remote sensing data. The results of model-data comparison revealed a good agreement in domain-average hydrographic....... In order to fully resolve the complexity of biological and physical interactions in the eastern equatorial Pacific, we recommended improving CoSiNE and other models by introducing more phytoplankton groups, variable Redfield and carbon to chlorophyll ratios, as well as resolving the Fe-Si co...

  20. TIARA annual report 2004

    International Nuclear Information System (INIS)

    Ohara, Yoshihiro; Arakawa, Kazuo; Tanaka, Shigeru; Narumi, Kazumasa; Yoshida, Masaru; Itoh, Hisayoshi; Yoshikawa, Masato; Tanaka, Atsushi; Kobayashi, Yasuhiko; Fukuda, Mitsuhiro; Otsubo, Michiro; Yokota, Watalu; Nakamura, Yoshiteru

    2006-01-01

    This annual report describes research and development activities which have been performed with the TIARA (Takasaki Ion Accelerators for Advanced Radiation Application) facilities from April 1, 2004 to March 31, 2005. The 126 of the presented papers are indexed individually. A list of publications, the type of research collaborations and organization of TIARA are also given as appendices. (J.P.N.)

  1. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  2. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  3. A Synthesis of Environmental and Plant Community Data for Tidal Wetland Restoration Planning in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Borde, Amy B.; Cullinan, Valerie I.

    2013-12-01

    This report reanalyzes and synthesizes previously existing environmental and plant community data collected by PNNL at 55 tidal wetlands and 3 newly restored sites in the lower Columbia River and estuary (LCRE) between 2005 and 2011. Whereas data were originally collected for various research or monitoring objectives of five studies, the intent of this report is to provide only information that will have direct utility in planning tidal wetland restoration projects. Therefore, for this report, all tidal wetland data on plants and the physical environment, which were originally developed and reported by separate studies, were tabulated and reanalyzed as a whole. The geographic scope of the data collected in this report is from Bonneville Lock and Dam to the mouth of the Columbia River

  4. Pelagic Project Mauritania 2005-2006

    NARCIS (Netherlands)

    Heessen, H.J.L.; Tjoe-Awie, P.J.; Haan, de D.; Ybema, M.S.

    2007-01-01

    The Pelagic Project Mauritania 2005-2006 was the continuation of two earlier, but similar, projects for the years 1998-2001 and 2002-2004. The project was carried out in cooperation between IMARES and IMROP and had as most important objectives to further the assessment of small pelagic species,

  5. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  6. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  7. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  8. The National Football League Combine: performance differences between drafted and nondrafted players entering the 2004 and 2005 drafts.

    Science.gov (United States)

    Sierer, S Patrick; Battaglini, Claudio L; Mihalik, Jason P; Shields, Edgar W; Tomasini, Nathan T

    2008-01-01

    The purpose of this study was to examine performance differences between drafted and nondrafted athletes (N = 321) during the 2004 and 2005 National Football League (NFL) Combines. We categorized players into one of 3 groups: Skill, Big skill, and Linemen. Skill players (SP) consisted of wide receivers, cornerbacks, free safeties, strong safeties, and running backs. Big skill players (BSP) included fullbacks, linebackers, tight ends, and defensive ends. Linemen (LM) consisted of centers, offensive guards, offensive tackles, and defensive tackles. We analyzed player height and mass, as well as performance on the following combine drills: 40-yard dash, 225-lb bench press test, vertical jump, broad jump, pro-agility shuttle, and the 3-cone drill. Student t-tests compared performance on each of these measures between drafted and nondrafted players. Statistical significance was found between drafted and nondrafted SP for the 40-yard dash (P ready themselves for the NFL Combine.

  9. Konjunktuuribaromeetrid : juuni 2005 / K. Martens, A. Vanamölder, E. Ahermaa...[jt.

    Index Scriptorium Estoniae

    2005-01-01

    Ilmunud ka: Konjunktuur : Quarterly Review of the Estonian Economy, 2005/Aug, nr. 2, lk. 13-42. Tööstus-, ehitus-, kaubandus-, teenindus- ja tarbijabaromeetri näitajad juunis 2005. Prognoosid lähikuudeks. Töötleva tööstuse investeeringud 2004. aastal, prognoos 2005. aastaks. Graafikud, diagrammid, tabelid

  10. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  11. From lab to field: Geotechnical properties for predicting embankment settlement on Lake Bonneville deposits

    International Nuclear Information System (INIS)

    Hoagland, K.C.; Sampaco, C.L.; Anderson, L.R.; Caliendo, J.A.; Rausher, L.; Keane, E.

    1994-01-01

    The results of a laboratory analysis, to determine geotechnical properties of lacustrine Lake Bonneville deposits, within the I-15 corridor of Salt Lake City, Utah, is presented. Laboratory vertical and horizontal consolidation coefficients are compared with those back-calculated from observed, field settlement data and linear relationships established. The results are used to select vertical and horizontal field coefficients and predict settlement rate of an existing embankment, scheduled for enlargement. 27 refs., 9 figs

  12. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  13. Hydrodynamic Simulation of the Columbia River, Hanford Reach, 1940--2004

    Energy Technology Data Exchange (ETDEWEB)

    Waichler, Scott R.; Perkins, William A.; Richmond, Marshall C.

    2005-06-15

    Many hydrological and biological problems in the Columbia River corridor through the Hanford Site require estimates of river stage (water surface elevation) or river flow and velocity. Systematic collection of river stage data at locations in the Hanford Reach began in 1991, but many environmental projects need river stage information at unmeasured locations or over longer time periods. The Modular Aquatic Simulation System 1D (MASS1), a one-dimensional, unsteady hydrodynamic and water quality model, was used to simulate the Columbia River from Priest Rapids Dam to McNary Dam from 1940 to 2004, providing estimates of water surface elevation, volumetric flow rate, and flow velocity at 161 locations on the Hanford Reach. The primary input data were bathymetric/topographic cross sections of the Columbia River channel, flow rates at Priest Rapids Dam, and stage at McNary Dam. Other inputs included Yakima River and Snake River inflows. Available flow data at a gaging station just below Priest Rapids Dam was mean daily flow from 1940 to 1986 and hourly thereafter. McNary dam was completed in 1957, and hourly stage data are available beginning in 1975. MASS1 was run at an hourly timestep and calibrated and tested using 1991--2004 river stage data from six Hanford Reach locations (areas 100B, 100N, 100D, 100H, 100F, and 300). Manning's roughness coefficient in the Reach above each river recorder location was adjusted using an automated genetic algorithm and gradient search technique in three separate calibrations, corresponding to different data subsets, with minimization of mean absolute error as the objective. The primary calibration was based on 1999, a representative year, and included all locations. The first alternative calibration also used all locations but was limited in time to a high-flow period during spring and early summer of 1997. The second alternative calibration was based on 1999 and included only 300 Area stage data. Model goodness-of-fit for all

  14. Brotes de rabia humana transmitida por vampiros en los municipios de Bajo y Alto Baudó, departamento del Chocó, Colombia 2004-2005

    OpenAIRE

    Jessika Valderrama; Ingrid García; Germán Figueroa; Edilberto Rico; Juliana Sanabria; Nicolás Rocha; Edgar Parra; Cecilia Saad; Andrés Páez

    2006-01-01

    Introducción. Entre mayo y julio de 2004 ocurrió en la comunidad Embera de Birrinchao de cuenca del río Purricha, Bajo Baudó, Chocó un brote de rabia humana con 14 víctimas. En enero de 2005 otro brote similar ocurrió en las comunidades negras de Pató y Nauca, Alto Baudó, Chocó, con tres nuevas víctimas. Objetivos. Describir los brotes de rabia humana transmitida por vampiros de mayor magnitud hasta ahora reportados en Colombia. Describir las técnicas diagnósticas utilizadas y las acciones...

  15. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  16. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  17. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  18. Airborne digital-image data for monitoring the Colorado River corridor below Glen Canyon Dam, Arizona, 2009 - Image-mosaic production and comparison with 2002 and 2005 image mosaics

    Science.gov (United States)

    Davis, Philip A.

    2012-01-01

    Airborne digital-image data were collected for the Arizona part of the Colorado River ecosystem below Glen Canyon Dam in 2009. These four-band image data are similar in wavelength band (blue, green, red, and near infrared) and spatial resolution (20 centimeters) to image collections of the river corridor in 2002 and 2005. These periodic image collections are used by the Grand Canyon Monitoring and Research Center (GCMRC) of the U.S. Geological Survey to monitor the effects of Glen Canyon Dam operations on the downstream ecosystem. The 2009 collection used the latest model of the Leica ADS40 airborne digital sensor (the SH52), which uses a single optic for all four bands and collects and stores band radiance in 12-bits, unlike the image sensors that GCMRC used in 2002 and 2005. This study examined the performance of the SH52 sensor, on the basis of the collected image data, and determined that the SH52 sensor provided superior data relative to the previously employed sensors (that is, an early ADS40 model and Zeiss Imaging's Digital Mapping Camera) in terms of band-image registration, dynamic range, saturation, linearity to ground reflectance, and noise level. The 2009 image data were provided as orthorectified segments of each flightline to constrain the size of the image files; each river segment was covered by 5 to 6 overlapping, linear flightlines. Most flightline images for each river segment had some surface-smear defects and some river segments had cloud shadows, but these two conditions did not generally coincide in the majority of the overlapping flightlines for a particular river segment. Therefore, the final image mosaic for the 450-kilometer (km)-long river corridor required careful selection and editing of numerous flightline segments (a total of 513 segments, each 3.2 km long) to minimize surface defects and cloud shadows. The final image mosaic has a total of only 3 km of surface defects. The final image mosaic for the western end of the corridor has

  19. SOLID WASTE INTEGRATED FORECAST TECHNICAL (SWIFT) REPORT FY2005 THRU FY2035 2005.0 VOLUME 2

    Energy Technology Data Exchange (ETDEWEB)

    BARCOT, R.A.

    2005-08-17

    This report provides up-to-date life cycle information about the radioactive solid waste expected to be managed by Hanford's Waste Management (WM) Project from onsite and offsite generators. It includes: (1) an overview of Hanford-wide solid waste to be managed by the WM Project; (2) multi-level and waste class-specific estimates; (3) background information on waste sources; and (4) comparisons to previous forecasts and other national data sources. The focus of this report is low-level waste (LLW), mixed low-level waste (MLLW), and transuranic waste, both non-mixed and mixed (TRU(M)). Some details on hazardous waste are also provided, however, this information is not considered comprehensive. This report includes data requested in December, 2004 with updates through March 31,2005. The data represent a life cycle forecast covering all reported activities from FY2005 through the end of each program's life cycle and are an update of the previous FY2004.1 data version.

  20. Evidence of increased toxic Alexandrium tamarense dinoflagellate blooms in the eastern Bering Sea in the summers of 2004 and 2005.

    Directory of Open Access Journals (Sweden)

    Masafumi Natsuike

    Full Text Available The eastern Bering Sea has a vast continental shelf, which contains various endangered marine mammals and large fishery resources. Recently, high numbers of toxic A. tamarense resting cysts were found in the bottom sediment surface of the eastern Bering Sea shelf, suggesting that the blooms have recently occurred. However, little is known about the presence of A. tamarense vegetative cells in the eastern Bering Sea. This study's goals were to detect the occurrence of A. tamarense vegetative cells on the eastern Bering Sea shelf and to find a relationship between environmental factors and their presence. Inter-annual field surveys were conducted to detect A. tamarense cells and environmental factors, such as nutrients, salinity, chlorophyll a, and water temperature, along a transect line on the eastern Bering Sea shelf during the summers of 2004, 2005, 2006, 2009, 2012, and 2013. A. tamarense vegetative cells were detected during every sampling year, and their quantities varied greatly from year to year. The maximum cell densities of A. tamarense observed during the summers of 2004 and 2005 were much higher than the Paralytic shellfish poisoning warning levels, which are greater than 100-1,000 cells L-1, in other subarctic areas. Lower quantities of the species occurred during the summers of 2009, 2012, and 2013. A significant positive correlation between A. tamarense quantity and water temperature and significant negative correlations between A. tamarense quantity and nutrient concentrations (of phosphate, silicate, and nitrite and nitrate were detected in every sampling period. The surface- and bottom-water temperatures varied significantly from year to year, suggesting that water temperatures, which have been known to affect the cell growth and cyst germination of A. tamarense, might have affected the cells' quantities in the eastern Bering Sea each summer. Thus, an increase in the Bering Sea shelf's water temperature during the summer will

  1. Evidence of increased toxic Alexandrium tamarense dinoflagellate blooms in the eastern Bering Sea in the summers of 2004 and 2005.

    Science.gov (United States)

    Natsuike, Masafumi; Saito, Rui; Fujiwara, Amane; Matsuno, Kohei; Yamaguchi, Atsushi; Shiga, Naonobu; Hirawake, Toru; Kikuchi, Takashi; Nishino, Shigeto; Imai, Ichiro

    2017-01-01

    The eastern Bering Sea has a vast continental shelf, which contains various endangered marine mammals and large fishery resources. Recently, high numbers of toxic A. tamarense resting cysts were found in the bottom sediment surface of the eastern Bering Sea shelf, suggesting that the blooms have recently occurred. However, little is known about the presence of A. tamarense vegetative cells in the eastern Bering Sea. This study's goals were to detect the occurrence of A. tamarense vegetative cells on the eastern Bering Sea shelf and to find a relationship between environmental factors and their presence. Inter-annual field surveys were conducted to detect A. tamarense cells and environmental factors, such as nutrients, salinity, chlorophyll a, and water temperature, along a transect line on the eastern Bering Sea shelf during the summers of 2004, 2005, 2006, 2009, 2012, and 2013. A. tamarense vegetative cells were detected during every sampling year, and their quantities varied greatly from year to year. The maximum cell densities of A. tamarense observed during the summers of 2004 and 2005 were much higher than the Paralytic shellfish poisoning warning levels, which are greater than 100-1,000 cells L-1, in other subarctic areas. Lower quantities of the species occurred during the summers of 2009, 2012, and 2013. A significant positive correlation between A. tamarense quantity and water temperature and significant negative correlations between A. tamarense quantity and nutrient concentrations (of phosphate, silicate, and nitrite and nitrate) were detected in every sampling period. The surface- and bottom-water temperatures varied significantly from year to year, suggesting that water temperatures, which have been known to affect the cell growth and cyst germination of A. tamarense, might have affected the cells' quantities in the eastern Bering Sea each summer. Thus, an increase in the Bering Sea shelf's water temperature during the summer will increase the

  2. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2004-09-01

    a benefit for steelhead. Survivals for spring fish in the Lower Granite to McNary Dam and the McNary to Bonneville Dam reach were similar to recent years. Returning numbers of adult spring and summer chinook, coho and steelhead were less than observed in 2002, but far exceeded the ten-year average return numbers. Sockeye numbers were less than both the 2002 returning adults and the ten-year average number. However, fall chinook numbers surpassed all previous counts at Bonneville Dam since 1938. In 2003, about 81 million juvenile salmon were released from Federal, State, tribal or private hatcheries into the Columbia River Basin above Bonneville Dam. This was slightly less than the number released last year, but about average for the past several years.

  3. Vaccinatietoestand Nederland per 1 januari 2005

    NARCIS (Netherlands)

    Abbink F; Oomen PJ; Zwakhals SLN; Melker HE de; Ambler-Huiskes A; Landelijke Vereniging van; Inspectie voor de Gezondheidszorg; CIE

    2006-01-01

    In 2005 national coverage levels for all vaccines used in the Netherlands showed a further increase as compared to 2004. Immunization coverage figures exceed the 95% level and meet the standards provided by the World Health Organisation. The national immunization coverage in the Netherlands has

  4. Brancherapport: Z-org benchmarkonderzoek thuiszorg 2004.

    NARCIS (Netherlands)

    2005-01-01

    In 2004-2005 werd voor de derde keer binnen de thuiszorg een benchmarkonderzoek gehouden. Dit qua opzet en scope unieke onderzoek is gehouden onder de leden van Z-org. Het is een vergelijkend onderzoek onder klanten, medewerkers en binnen de zorgorganisaties zelf waarbij het de bedoeling is te leren

  5. Southwestern Power Administration Annual Report 2004-2006

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-01-01

    Confidence Commitment Cooperation These are words that spring to mind regarding Southwestern Power Administration’s performance during fiscal years (FY) 2004-2006 By offering innovative, customer-oriented service, working to improve system reliability and efficiency, and partnering with customers and other Federal power stakeholders, Southwestern has certainly exhibited all three of these qualities during these challenging yet productive years In fact, our cooperative working relationships were critical to our success during the severe and widespread drought conditions which prevailed throughout Southwestern’s marketing area for much of 2005-2006 When we proposed a temporary energy deferral program, our customers came on board by voluntarily taking less Federal hydropower than they were entitled to, enabling us to preserve system storage and fulfill our contract obligations during the crucial summer months of 2006 The U S Army Corps of Engineers (Corps) also helped improve our drought situation by allowing Southwestern more operational flexibility on a regional level Despite the challenges this critical drought period presented, Southwestern remained committed to fulfilling our mission and strategic goals From FY 2004 through FY 2006, we marketed and delivered all available Federal hydropower while meeting and even exceeding the reliability standards of the North American Electric Reliability Corporation (NERC) Our Power Operations Training Center in Springfield, Missouri, was cited as an “Example of Excellence” during a NERC readiness audit in October 2006; and as we have every year since NERC began measuring, Southwestern far exceeded the accepted NERC compliance ratings for power system operations reliability Our commitment to excellence and accountability has kept our repayment goals on target as well Revenues were sufficient to repay all annual expenses and the required principal investment in the Federal hydropower facilities Furthermore, the original

  6. PERILAKU RISIKO TINGGI PENULARAN HIV PADA REMAJA DI INDONESIA, 2004-2005

    Directory of Open Access Journals (Sweden)

    Dina Bisara Lolong

    2012-11-01

    Full Text Available The major routes for HIV transmission in Indonesia are injecting drug use and heterosexual activity. More than halve of the proportion of estimation 2006 of people living with HIV/AIDS were IDUs. Around 70 percent of all reported AIDS cases of IDUs in Indonesia occur among those in the age group of15-29 years. It indicates that young people are not only at high risk of contracting HIV infection but already constitute a significant percentage of people living with HIV/AIDS. This article is examines adolescent risk behavior on HIV transmission in Indonesia. The data were obtained from Behavioral Surveillance Survey 2004-2005 of 6352 female sex workers and 2969 their clients in 14 provinces, 1052 transsexual in four provinces, and 1795 IDUs in five cities as well as 1001 male student and 1159 female student in two cities. This survey reveals that adolescent's high risk behavior on HIV transmission is not only through injecting drug use but also through heterosexual. Of great concern is that 40 percent of the female sex workers and more than halve of IDUs aged 15-24 years. Findings also show that risk behavior is associated with age of respondent. Younger ages of IDUs were more like to have more than one sex partners and sharing needle; and again 27 percent of younger ages 15-19 year have started to be involved in high risk behavior as IDUs age below 15 compared to age 20-24 and 25+ nine and one percent respectively. Furthermore, the younger ages of sex workers and their clients were less likely to use condoms; and around 25-60 percent of them have begun to work as commercial sex workers age below 20.The findings of this survey raise concern about risk behavior of HIV transmission among adolescent. The need to focus more policy and program attention on adolescent sexuality and drug use behavior is compelling. Keywords : adolescence, risk behavior, HIV transmission

  7. Injury Profile in Women Shotokan Karate Championships in Iran (2004-2005)

    Science.gov (United States)

    Halabchi, Farzin; Ziaee, Vahid; Lotfian, Sarah

    2007-01-01

    The aims of this paper were to record injury rates among Iranian women competitive Shotokan karate athletes and propose possible predisposing factors. A prospective recording of the injuries resulting from all matches in 6 consecutive women national Shotokan Karate Championships in all age groups in Iran (season 2004-2005) was performed. Data recorded included demographic characteristics (Age and Weight), athletic background (rank, years of experience, time spent training and previous injuries), type, location and reason for the injury, and the result of the match. Results indicate 186 recorded injuries from a total of 1139 bouts involving 1019 athletes, therefore there were 0.163 injury per bout [C.I. 95%: 0.142-0.184] and 183 injuries per 1000 athletes [C.I. 95%: 159-205]. Injuries were most commonly located in the head and neck (55.4%) followed by the lower limb (21%), upper limb (12.9%) and trunk (10.8%). Punches (48. 4%) were associated with more injuries than kicks (33.3%). The injuries consisted of muscle strain and contusion (81, 43.6%), hematoma and epistaxis (49, 26.3%), lacerations and abrasions (28, 15. 1%), concussion (13, 7%), tooth avulsion or subluxation (3, 1.6%), joint dislocation (3, 1.6%) and fractures (3, 1.6%). In conclusion, as the majority of injuries are minor, and severe or longstanding injuries are uncommon, it can be argued that shotokan karate is a relatively safe for females, despite its image as a combat sport, where ostensibly the aim appears to injure your opponent. Further research is needed to evaluate the effective strategies to minimize the risk of injuries. Key points 186 injuries were recorded during women competitions. Incidence rates of 0.163 injury per bout and 183 injuries per 1000 athletes were calculated. The injuries were most commonly located in the head and neck. Muscle strain and contusion, hematoma and epistaxis constitute the majority of injuries. PMID:24198704

  8. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  9. Academic Training: 2004 - 2005 ACADEMIC TRAINING PROGRAMME

    CERN Multimedia

    Françoise Benz

    2004-01-01

    1st Term - 01 October to 17 December 2004 REGULAR LECTURE PROGRAMME New Trends in Fusion Research by A. Fasoli, EPFL, Lausanne, CH 11, 12, 13 October Physics at e+e- linear collider by K. Desch, DESY, Hamburg, D 15, 16, 17, 18, 19 November LECTURE SERIES FOR POSTGRADUATE STUDENTS Standard Model by R. Barbieri, CERN-PH-TH 6, 7, 8, 9 10 December The lectures are open to all those interested, without application. The abstract of the lectures, as well as any change to the above information (title, dates, time, place etc) will be published in the CERN Bulletin, the WWW, and by notices before each term and for each series of lectures. ENSEIGNEMENT ACADEMIQUE ACADEMIC TRAINING Françoise Benz 73127 academic.training@cern.ch If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form a...

  10. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  11. Geomorphic and vegetation changes in a meandering dryland river regulated by a large dam, Sauce Grande River, Argentina

    Science.gov (United States)

    Casado, Ana; Peiry, Jean-Luc; Campo, Alicia M.

    2016-09-01

    This paper investigates post-dam geomorphic and vegetation changes in the Sauce Grande River, a meandering dryland river impounded by a large water-conservation dam. As the dam impounds a river section with scarce influence of tributaries, sources for fresh water and sediment downstream are limited. Changes were inspected based on (i) analysis of historical photographs/imagery spanning pre- (1961) and post-dam (1981, 2004) channel conditions for two river segments located above and below the dam, and (ii) field survey of present channel conditions for a set of eight reference reaches along the river segments. Whilst the unregulated river exhibited active lateral migration with consequent adjustments of the channel shape and size, the river section below the dam was characterized by (i) marked planform stability (93 to 97%), and by (ii) vegetation encroachment leading to alternating yet localized contraction of the channel width (up to 30%). The present river displays a moribund, stable channel where (i) redistribution of sediment along the river course no longer occurs and (ii) channel forms constitute a remnant of a fluvial environment created before closing the dam, under conditions of higher energy. In addition to providing new information on the complex geomorphic response of dryland rivers to impoundment, this paper represents the very first geomorphic assessment of the regulated Sauce Grande and therefore provides an important platform to underpin further research assessing the geomorphic state of this highly regulated dryland river.

  12. G8 global partnership. 2004-2005-2006 activity report

    International Nuclear Information System (INIS)

    2007-01-01

    The Global Partnership Against the Spread of Weapons and Materials of Mass Destruction was launched by the heads of state and government of the G8 at the G8 summit in Kananaskis in June 2002. Fourteen other countries have since joined this G8 initiative. The aim of this partnership is to 'prevent terrorists, or those who harbor them, from acquiring or developing nuclear, chemical radiological and biological weapons, missiles, and related materials, equipment and technology'. Within the framework of the Partnership, the participants have agreed to support cooperation projects, starting with Russia, to promote non-proliferation, disarmament, the fight against terrorism and nuclear safety. The destruction of chemical weapons, the dismantling of decommissioned nuclear submarines, the disposal of fissile materials and the employment of former weapons scientists are among the priority concerns expressed. Ukraine has also been a beneficiary of this partnership since 2004. The participants in this initiative have agreed to contribute up to 20 billion dollars (up to 750 million euros from France) to support these projects over a period of ten years from 2002. A group of experts from the G8 on the Global Partnership (the GPWG = Global Partnership Working Group) meets regularly and gives an account of the progress made with this initiative in its annual report to the G8. These annual reports are published at the G8 summits. This document is the 2004 to 2006 activity report of the G8 global partnership

  13. Chixoy Dam Legacies: The Struggle to Secure Reparation and the Right to Remedy in Guatemala

    Directory of Open Access Journals (Sweden)

    Barbara Rose Johnston

    2010-06-01

    Full Text Available The World Commission on Dams brought global attention to the adverse costs of large dam development, including the disproportionate displacement of indigenous peoples and ethnic minorities and the extreme impoverishment of development refugees. The WCD recommended that governments, industry and financial institutions accept responsibility for flawed development and make proper reparation, including remedial activities such as the restoration of livelihood and land compensation for relocated communities. One exemplary case cited is Guatemala’s Chixoy dam. Completed in 1982, this internationally financed dam was built during a time when military dictatorships deployed policies of state-sponsored violence against a Mayan citizenry. Construction occurred without a resettlement plan, and forced displacement occurred through violence and massacre. This paper describes an attempt to implement WCD reparation recommendations in a context where no political will existed. To clarify events, abuses and meaningful remedy, an independent assessment process was established in 2003, auditing the development record, assessing consequential damages and facilitating the community articulation of histories and needs. The resulting 2005 study played a key role in reparation negotiations. The Chixoy case illustrates some of the more profound impacts of the WCD review. The WCD served as a catalyst in social movement formation and a force that expanded rights-protective space for dam-affected communities to negotiate an equitable involvement in development.

  14. Powernext futures statistics - August 31, 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the August 31, 2005 update of Powernext Futures TM statistics: year, quarter and month contracts for August 2005, base-load and peak-load contracts overview from March 2005 to August 2005 (daily volume in lots, open interest by delivery year in MWh, daily settlement price of the upcoming delivery period, base-load and peak-load price spreads), and market liquidity in August 2005 (average bid ask spread and availability). (J.S.)

  15. Powernext futures statistics - December 31, 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the December 31, 2005 update of Powernext Futures TM statistics: year, quarter and month contracts for December 2005, base-load and peak-load contracts overview from July 2005 to December 2005 (daily volume in lots, open interest by delivery year in MWh, daily settlement price of the upcoming delivery period, base-load and peak-load price spreads), and market liquidity in December 2005 (average bid ask spread and availability). (J.S.)

  16. Powernext futures statistics - November 30, 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The introduction of a power exchange in France is a direct response to the opening up of the European electricity markets. Powernext SA is a Multilateral Trading Facility in charge of managing an optional and anonymous organised exchange offering: - Day-ahead contracts for the management of volume risk on Powernext Day-Ahead TM since 21 November 2001, - Medium term contracts for the management of price risk on Powernext Futures TM since 18 June 2004. This document presents in a series of tables and graphics the November 30, 2005 update of Powernext Futures TM statistics: year, quarter and month contracts for November 2005, base-load and peak-load contracts overview from June 2005 to November 2005 (daily volume in lots, open interest by delivery year in MWh, daily settlement price of the upcoming delivery period, base-load and peak-load price spreads), and market liquidity in November 2005 (average bid ask spread and availability). (J.S.)

  17. Annual Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Swiboda, G [Institute of Atomic Energy, Otwock-Swierk (Poland)

    2006-07-01

    The Annual Report of the Institute of Atomic Energy describes the results of the research activities carried out in 2005. The document consist of seven parts: General Information; Operation and safety of MARIA reactor; Radiological protection and dosimetry; Nuclear Technology in Energy Generation; Solid State Physics; Nuclear techniques in Health and Environment Protection management of Hazards and in last section the list of published in 2004 papers, conferences, seminars, workshops, research projects and educational activities are presented.

  18. Annual Report 2005

    International Nuclear Information System (INIS)

    Swiboda, G.

    2006-01-01

    The Annual Report of the Institute of Atomic Energy describes the results of the research activities carried out in 2005. The document consist of seven parts: General Information; Operation and safety of MARIA reactor; Radiological protection and dosimetry; Nuclear Technology in Energy Generation; Solid State Physics; Nuclear techniques in Health and Environment Protection management of Hazards and in last section the list of published in 2004 papers, conferences, seminars, workshops, research projects and educational activities are presented

  19. Effects of Domestication on Predation Mortality and Competitive Dominance; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; Fritts, Anthony L.; Scott, Jennifer L. (Washington Department of Fish and Wildlife, Olympia, WA)

    2005-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from the Washington Department of Fish and Wildlife (WDFW) to the Bonneville Power Administration (BPA), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the second of a series of progress reports that address the effects of hatchery domestication on predation mortality and competitive dominance in the upper Yakima River basin (Pearsons et al. 2004). This progress report summarizes data collected between January 1, 2004 and December 31, 2004. Raising fish in hatcheries can cause unintended behavioral, physiological, or morphological changes in chinook salmon due to domestication selection. Domestication selection is defined by Busack and Currens 1995 as, ''changes in quantity, variety, or combination of alleles within a captive population or between a captive population and its source population in the wild as a result of selection in an artificial environment''. Selection in artificial environments could be due to intentional or artificial selection, biased sampling during some stage of culture, or unintentional selection (Busack and Currens 1995). Genetic changes can result in lowered survival in the natural environment (Reisenbichler and Rubin 1999). The goal of supplementation or conservation hatcheries is to produce fish that will integrate into natural populations. Conservation hatcheries attempt to minimize intentional or biased sampling so that the hatchery fish are similar to naturally produced fish. However, the selective pressures in hatcheries are dramatically different than in the wild, which can result in genetic differences between hatchery and wild fish. The selective pressures may be particularly prominent during the freshwater rearing stage where most mortality of wild fish occurs

  20. Assessment of Native Salmonids Above Hells Canyon Dam, Idaho, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Kevin A.; Lamansky, Jr., James A. (Idaho Department of Fish and Game, Boise, ID)

    2005-08-01

    In the western United States, exotic brook trout Salvelinus fontinalis frequently have a deleterious effect on native salmonids, and biologists often attempt to remove brook trout in streams using electrofishing. Although the success of electrofishing removal projects typically is low, few studies have assessed the underlying mechanisms of failure, especially in terms of compensatory responses. We evaluated the effectiveness of a three-year removal project in reducing brook trout and enhancing native salmonids in 7.8 km of an Idaho stream and looked for brook trout compensatory responses such as decreased natural mortality, increased growth, increased fecundity at length, or earlier maturation. Due to underestimates of the distribution of brook trout in the first year and personnel shortages in the third year, the multiagency watershed advisory group that performed the project fully treated the stream (i.e. multipass removals over the entire stream) in only one year. In 1998, 1999, and 2000, a total of 1,401, 1,241, and 890 brook trout were removed, respectively. For 1999 and 2000, an estimated 88 and 79% of the total number of brook trout in the stream were removed. For the section of stream that was treated in all years, the abundance of age-1 and older brook trout decreased by 85% from 1998 to 2003. In the same area, the abundance of age-0 brook trout decreased 86% from 1998 to 1999 but by 2003 had rebounded to near the original abundance. Abundance of native redband trout Oncorhynchus mykiss decreased for age-1 and older fish but did not change significantly for age-0 fish. Despite high rates of removal, total annual survival rate for brook trout increased from 0.08 {+-} 0.02 in 1998 to 0.20 {+-} 0.04 in 1999 and 0.21 {+-} 0.04 in 2000. Growth of age-0 brook trout was significantly higher in 2000 (the year after their abundance was lowest) compared to other years, and growth of age-1 and age-2 brook trout was significantly lower following the initial removal years but recovered by 2003. Few other brook trout demographic parameters changed appreciably over the course of the project. Electrofishing removals required 210 person-days of effort. Despite experiencing slight changes in abundance, growth, and survival, brook trout in Pikes Fork appeared little affected by three years of intensive removal efforts, most likely because mortality within the population was high prior to initiation of the project such that the removal efforts merely replaced natural mortality with exploitation.

  1. Publications 2004

    Directory of Open Access Journals (Sweden)

    2005-03-01

    Full Text Available Fabienne Blaise- F. Blaise, P. Judet de La Combe et Ph. Rousseau (éds. : Le Métier du mythe. Lectures d'Hésiode (Villeneuve d'Ascq, PUS, 1996 - traduction chinoise à paraître aux éditions Huaxia Publishing House of China, Pékin, en 2005.Jean Bollack- La Muerte de Antigona. La tragedia de Creonte. Traduction en espagnol de La Mort d'Antigone (Paris, PUF, 1999 par Arnaud Pons et de Xavier Riu, Arena Libros, coll. Tempo al Tempo, Madrid 2004,  144 p. -  Sentido contra sentido. ¿ Como se lee ?...

  2. Draft Budget of the Organization for the Fifty-First Financial Year 2005

    CERN Document Server

    2004-01-01

    A sa réunion du 15 septembre 2004 , le Comité des finances a recommandé au Conseil d'approuver le projet préliminaire de budget 2005 aux prix de 2004. La présente version tient compte des transferts du budget 2004 présentés dans le document "Budget 2004 - Transferts et dépassements de crédits" , du prélèvement dans la réserve pour imprévus pour le LHC indiqué dans le document "Réserve pour imprévus pour le LHC" et de divers ajustements mineurs. En conséquence, il est demandé au Comité des finances de recommander au Conseil d'approuver les modifications par rapport au projet préliminaire de budget 2005 présentées dans les tableaux de l'annexe 1.

  3. Technical Cooperation Report for 2004. Report by the Director General

    International Nuclear Information System (INIS)

    2005-08-01

    The Technical Cooperation Report for 2004 highlights activities and achievements of the technical cooperation programme for the past year. During 2004, the Secretariat finalized the technical cooperation programme for the 2005-2006 biennium, which was approved by the Board of Governors in November 2004. A revised project appraisal process was carried out for the 2005-2006 programme, which yielded additional information regarding government commitment, national capabilities and project performance indicators and outcomes. Included in the 2005-2006 biennium is a strengthened programme for upgrading radiation protection infrastructure. The Secretariat used the experience of the past ten years, as well as conclusions from evaluations, to create a programme that would build upon the successes and lessons learned to provide the safe use of nuclear technology with well-regulated infrastructures. Activities carried out in 2004 built upon previous achievements through national and regional projects in many thematic areas. The programme continued to reinforce the capacity for cancer diagnosis and therapy by providing training and expertise and supporting the procurement of equipment. Consistent support for surveillance techniques using nuclear technology is helping to fight trans-boundary animal diseases, and is leading to countries becoming rinderpest-free. The Secretariat continued to provide expertise and support to assist with the repatriation of highly enriched uranium reactor fuel to the country of origin. The development of partnerships with other United Nations organizations, as well as non-governmental organizations, continues to be of great importance to the technical cooperation programme. In 2004, for example, a memorandum of understanding was signed with the Regional Office for Africa (AFRO) of the World Health Organization (WHO) to support the improvement of health conditions and to raise standards of health in the region. Extrabudgetary resources reached more

  4. Technical Cooperation Report for 2004. Report by the Director General

    International Nuclear Information System (INIS)

    2005-08-01

    The Technical Cooperation Report for 2004 highlights activities and achievements of the technical cooperation programme for the past year. During 2004, the Secretariat finalized the technical cooperation programme for the 2005-2006 biennium, which was approved by the Board of Governors in November 2004. A revised project appraisal process was carried out for the 2005-2006 programme, which yielded additional information regarding government commitment, national capabilities and project performance indicators and outcomes. Included in the 2005-2006 biennium is a strengthened programme for upgrading radiation protection infrastructure. The Secretariat used the experience of the past ten years, as well as conclusions from evaluations, to create a programme that would build upon the successes and lessons learned to provide the safe use of nuclear technology with well-regulated infrastructures. Activities carried out in 2004 built upon previous achievements through national and regional projects in many thematic areas. The programme continued to reinforce the capacity for cancer diagnosis and therapy by providing training and expertise and supporting the procurement of equipment. Consistent support for surveillance techniques using nuclear technology is helping to fight trans-boundary animal diseases, and is leading to countries becoming rinderpest-free. The Secretariat continued to provide expertise and support to assist with the repatriation of highly enriched uranium reactor fuel to the country of origin. The development of partnerships with other United Nations organizations, as well as non-governmental organizations, continues to be of great importance to the technical cooperation programme. In 2004, for example, a memorandum of understanding was signed with the Regional Office for Africa (AFRO) of the World Health Organization (WHO) to support the improvement of health conditions and to raise standards of health in the region. Extrabudgetary resources reached more

  5. Technical Cooperation Report for 2004. Report by the Director General

    International Nuclear Information System (INIS)

    2005-08-01

    The Technical Cooperation Report for 2004 highlights activities and achievements of the technical cooperation programme for the past year. During 2004, the Secretariat finalized the technical cooperation programme for the 2005-2006 biennium, which was approved by the Board of Governors in November 2004. A revised project appraisal process was carried out for the 2005-2006 programme, which yielded additional information regarding government commitment, national capabilities and project performance indicators and outcomes. Included in the 2005-2006 biennium is a strengthened programme for upgrading radiation protection infrastructure. The Secretariat used the experience of the past ten years, as well as conclusions from evaluations, to create a programme that would build upon the successes and lessons learned to provide the safe use of nuclear technology with well-regulated infrastructures. Activities carried out in 2004 built upon previous achievements through national and regional projects in many thematic areas. The programme continued to reinforce the capacity for cancer diagnosis and therapy by providing training and expertise and supporting the procurement of equipment. Consistent support for surveillance techniques using nuclear technology is helping to fight trans-boundary animal diseases, and is leading to countries becoming rinderpest-free. The Secretariat continued to provide expertise and support to assist with the repatriation of highly enriched uranium reactor fuel to the country of origin. The development of partnerships with other United Nations organizations, as well as non-governmental organizations, continues to be of great importance to the technical cooperation programme. In 2004, for example, a memorandum of understanding was signed with the Regional Office for Africa (AFRO) of the World Health Organization (WHO) to support the improvement of health conditions and to raise standards of health in the region. Extrabudgetary resources reached more

  6. Technical Cooperation Report for 2004. Report by the Director General

    International Nuclear Information System (INIS)

    2005-07-01

    The Technical Cooperation Report for 2004 highlights activities and achievements of the technical cooperation programme for the past year. During 2004, the Secretariat finalized the technical cooperation programme for the 2005-2006 biennium, which was approved by the Board of Governors in November 2004. A revised project appraisal process was carried out for the 2005-2006 programme, which yielded additional information regarding government commitment, national capabilities and project performance indicators and outcomes. Included in the 2005-2006 biennium is a strengthened programme for upgrading radiation protection infrastructure. The Secretariat used the experience of the past ten years, as well as conclusions from evaluations, to create a programme that would build upon the successes and lessons learned to provide the safe use of nuclear technology with well-regulated infrastructures. Activities carried out in 2004 built upon previous achievements through national and regional projects in many thematic areas. The programme continued to reinforce the capacity for cancer diagnosis and therapy by providing training and expertise and supporting the procurement of equipment. Consistent support for surveillance techniques using nuclear technology is helping to fight trans-boundary animal diseases, and is leading to countries becoming rinderpest-free. The Secretariat continued to provide expertise and support to assist with the repatriation of highly enriched uranium reactor fuel to the country of origin. The development of partnerships with other United Nations organizations, as well as non-governmental organizations, continues to be of great importance to the technical cooperation programme. In 2004, for example, a memorandum of understanding was signed with the Regional Office for Africa (AFRO) of the World Health Organization (WHO) to support the improvement of health conditions and to raise standards of health in the region. Extrabudgetary resources reached more

  7. Technical Cooperation Report for 2004. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-15

    The Technical Cooperation Report for 2004 highlights activities and achievements of the technical cooperation programme for the past year. During 2004, the Secretariat finalized the technical cooperation programme for the 2005-2006 biennium, which was approved by the Board of Governors in November 2004. A revised project appraisal process was carried out for the 2005-2006 programme, which yielded additional information regarding government commitment, national capabilities and project performance indicators and outcomes. Included in the 2005-2006 biennium is a strengthened programme for upgrading radiation protection infrastructure. The Secretariat used the experience of the past ten years, as well as conclusions from evaluations, to create a programme that would build upon the successes and lessons learned to provide the safe use of nuclear technology with well-regulated infrastructures. Activities carried out in 2004 built upon previous achievements through national and regional projects in many thematic areas. The programme continued to reinforce the capacity for cancer diagnosis and therapy by providing training and expertise and supporting the procurement of equipment. Consistent support for surveillance techniques using nuclear technology is helping to fight trans-boundary animal diseases, and is leading to countries becoming rinderpest-free. The Secretariat continued to provide expertise and support to assist with the repatriation of highly enriched uranium reactor fuel to the country of origin. The development of partnerships with other United Nations organizations, as well as non-governmental organizations, continues to be of great importance to the technical cooperation programme. In 2004, for example, a memorandum of understanding was signed with the Regional Office for Africa (AFRO) of the World Health Organization (WHO) to support the improvement of health conditions and to raise standards of health in the region. Extrabudgetary resources reached more

  8. Technical Cooperation Report for 2004. Report by the Director General

    International Nuclear Information System (INIS)

    2005-08-01

    The Technical Cooperation Report for 2004 highlights activities and achievements of the technical cooperation programme for the past year. During 2004, the Secretariat finalized the technical cooperation programme for the 2005-2006 biennium, which was approved by the Board of Governors in November 2004. A revised project appraisal process was carried out for the 2005-2006 programme, which yielded additional information regarding government commitment, national capabilities and project performance indicators and outcomes. Included in the 2005-2006 biennium is a strengthened programme for upgrading radiation protection infrastructure. The Secretariat used the experience of the past ten years, as well as conclusions from evaluations, to create a programme that would build upon the successes and lessons learned to provide the safe use of nuclear technology with well-regulated infrastructures. Activities carried out in 2004 built upon previous achievements through national and regional projects in many thematic areas. The programme continued to reinforce the capacity for cancer diagnosis and therapy by providing training and expertise and supporting the procurement of equipment. Consistent support for surveillance techniques using nuclear technology is helping to fight trans-boundary animal diseases, and is leading to countries becoming rinderpest-free. The Secretariat continued to provide expertise and support to assist with the repatriation of highly enriched uranium reactor fuel to the country of origin. The development of partnerships with other United Nations organizations, as well as non-governmental organizations, continues to be of great importance to the technical cooperation programme. In 2004, for example, a memorandum of understanding was signed with the Regional Office for Africa (AFRO) of the World Health Organization (WHO) to support the improvement of health conditions and to raise standards of health in the region. Extrabudgetary resources reached more

  9. Hydropower operations data management at Bonneville Power Administration

    International Nuclear Information System (INIS)

    Dies, R.

    2006-01-01

    The decision support software used by Bonneville Power Administration (BPA) in its operation of the Federal Columbia River Power System in the Pacific northwest was presented along with examples of water resources data and information regarding weather and stream flow. Water resources data is used extensively in hydropower operations for planning purposes through to real-time operations. This includes long-term historical hydrology and realtime system information on snow cover, river discharges and water elevations. Since the data comes from many different sources, the quality and frequency varies, with sample intervals ranging from seconds to days. Some data may be intermittent and transmitted only when thresholds are reached. Data can be communication via SCADA telemetry, the Internet, direct satellite feed, telephone or fax. The key requirement for a decision support system is the reliable and easily accessed compilation of all this data. The BPA uses long-term planning models, system-wide generation scheduling applications, and near-real-time optimization of generating units. It was suggested that the hydrologic forecasting community could benefit from the utility's experience using these applications. tabs., figs

  10. Hydrology and surface morphology of the Bonneville Salt Flats and Pilot Valley Playa, Utah

    Science.gov (United States)

    Lines, Gregory C.

    1979-01-01

    The Bonneville Salt Flats and Pilot Valley are in the western part of the Great Salt Lake Desert in northwest Utah. The areas are separate, though similar, hydrologic basins, and both contain a salt crust. The Bonneville salt crust covered about 40 square miles in the fall of 1976, and the salt crust in Pilot Valley covered 7 square miles. Both areas lack any noticeable surface relief (in 1976, 1.3 feet on the Bonneville salt crust and 0.3 foot on the Pilot Valley salt crust).The salt crust on the Salt Flats has been used for many years for automobile racing, and brines from shallow lacustrine deposits have been used for the production of potash. In recent years, there has been an apparent conflict between these two major uses of the area as the salt crust has diminished in both thickness and extent. Much of the Bonneville Racetrack has become rougher, and there has also been an increase in the amount of sediment on the south end of the racetrack. The Pilot Valley salt crust and surrounding playa have been largely unused.Evaporite minerals on the Salt Flats and the Pilot Valley playa are concentrated in three zones: (1) a carbonate zone composed mainly of authigenic clay-size carbonate minerals, (2) a sulfate zone composed mainly of authigenic gypsum, and (3) a chloride zone composed of crystalline halite (the salt crust). Five major types of salt crust were recognized on the Salt Flats, but only one type was observed in Pilot Valley. Geomorphic differences in the salt crust are caused by differences in their hydrologic environments. The salt crusts are dynamic features that are subject to change because of climatic factors and man's activities.Ground water occurs in three distinct aquifers in much of the western Great Salt Lake Desert: (1) the basin-fill aquifer, which yields water from conglomerate in the lower part of the basin fill, (2) the alluvial-fan aquifer, which yields water from sand and gravel along the western margins of both playas, and (3) the

  11. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  12. Conductor qualification tests for the 30-MJ Bonneville Power Administration SMES coil

    International Nuclear Information System (INIS)

    Schermer, R.I.; Boenig, H.J.; Henke, M.; Turner, R.D.; Schramm, R.

    1980-01-01

    The 30-MJ energy storage coil for the Bonneville Power Administration requires a low-loss, cryostable conductor that is able to carry 4.9 kA in a field of 2.8 T and will maintain its properties over 10 8 partial discharge cycles. The multi-level cable which satisfies these requirements has been extensively tested at various stages in its development and in its final form. Tests have been performed to determine the effect of manufacturing options on ac losses, low temperature electrical resistivity, stability, and fatigue resistance of the insulated conductor. This paper will concentrate on the stability and fatigue tests which have not previously been reported

  13. CERN car stickers 2005

    CERN Multimedia

    Reception and Access Control Service - TS Department

    2004-01-01

    Please note that the car stickers for 2005 are now available. If you have not received the new one by internal mail, you should go along in person to the Registration Service (bldg. 55 - 1st floor), open non-stop from 7:30 to 16:30, taking with you your 2004 sticker and the log-book of your vehicle. Thank you for your collaboration. Reception and Access Control Service - TS Department.

  14. Kelt Reconditioning: A Research Project to Enhance Iteroparity in Columbia Basin Steelhead (Oncorhynchus mykiss), 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hatch, Douglas R.; Branstetter, Ryan; Whiteaker, John (Columbia River Inter-Tribal Fish Commission, Portland, OR)

    2004-11-01

    experiment. All steelhead kelts received hw-wiegandt multi vit dietary supplement as a means to improve initial nutrition. Long-term steelhead kelts received Moore-Clark pellets to provide essential minerals and nutrients necessary for gonadal redevelopment. Oxytetracycline was administered to all reconditioned fish to boost immune system response following the stress of initial capture. To control parasitic infestations two methods were used, first, after initial capture an intubation of Ivermectin{trademark} was administered to control internal parasites (e.g., Salmincola spp.). Next, a Formalin drip was used for the duration of reconditioning to prevent fungal outbreaks. Captured kelts were separated into three experimental groups: short-term reconditioning, long-term reconditioning, and direct transport and release. Success indicators for the short-term experiment include the proportion of fish that survived the reconditioning process and the proportion of fish that initiated a feeding response. Short-term kelts were reconditioned for 3 to 5 weeks. Surviving specimens were released for natural spawning on May 11, 2004. Survival-to-release was good for the short-term experiment, with a rate of 79.0%. Long-term steelhead kelts are currently being held for a 6-9 month period with a scheduled release in December 2004. Long-term success indicators include the proportion of fish that survived the reconditioning process and the proportion of surviving fish that successfully remature. Survival and rematuration for long-term kelts has not been determined and will be presented in the 2005 annual report. Direct transport and release kelts and short-term reconditioned kelts were radio or acoustic tagged to assess their travel time and migratory behaviors below Bonneville Dam. A total of 29 direct-transport and release kelts and 29 short-term reconditioned kelts received surgically implanted radio tags, and a total of 28 direct-transport/release and 26 short-term reconditioned fish

  15. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities, 1991

    International Nuclear Information System (INIS)

    Hawkes, L.A.; Martinson, R.D.; Smith, W.W.

    1992-04-01

    The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management

  16. International Atomic Energy Agency publications. Publications catalogue 2006 including full details of publications published in 2004-2005 and forthcoming in 2006 and a stocklist of publications published in 2002-2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    This Publications Catalogue lists all sales publications of the IAEA published in 2004, 2005 and forthcoming in 2006. Most IAEA publications are issued in English, some are also available in Arabic, Chinese, French, Russian or Spanish. This is indicated at the bottom of the book entry. A complete listing of all IAEA priced publications is available on the IAEA's web site: http://www.iaea.org/books.

  17. International Atomic Energy Agency publications. Publications catalogue 2006 including full details of publications published in 2004-2005 and forthcoming in 2006 and a stocklist of publications published in 2002-2003

    International Nuclear Information System (INIS)

    2006-03-01

    This Publications Catalogue lists all sales publications of the IAEA published in 2004, 2005 and forthcoming in 2006. Most IAEA publications are issued in English, some are also available in Arabic, Chinese, French, Russian or Spanish. This is indicated at the bottom of the book entry. A complete listing of all IAEA priced publications is available on the IAEA's web site: http://www.iaea.org/books

  18. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  19. De controle van collectieve leidingwaterinstallaties in 2005

    NARCIS (Netherlands)

    Dik HHJ; Versteegh A; IMD

    2007-01-01

    The Inspection of collective tapwater installations in 2005. Progress and findings. Since 2004 the drinking water companies in the Netherlands have, by law, had the task of inspecting connected tapwaterinstallations for both the risk of contamination of the public mains system and the risks posed

  20. I-NERI 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-01-01

    The International Nuclear Energy Research Initiative (I-NERI) supports the National Energy Policy by conducting research to advance the state of nuclear science and technology in the United States (U.S.). I-NERI sponsors innovative scientific and engineering research and development (R&D) in cooperation with participating countries. The R&D research performed under the I-NERI umbrella addresses the key issues affecting the future of nuclear energy and its global deployment. I-NERI research is directed towards improving cost performance, increasing proliferation resistance, enhancing safety, and improving the waste management of future nuclear energy systems. This I-NERI 2004 Annual Report serves to inform interested parties on the program's organization, progress of the collaborative research projects, and future planning for the program. The report covers the four years of I-NERI activity since the program's inception in fiscal year (FY) 2001. The motivation and series of events that led to the creation of the I-NERI program are discussed in Section 2. The participating countries in current I-NERI collaborative agreements are also presented. Section 3 presents an overview of the I-NERI goals and objectives, a work scope summary for the collaborative projects, and a summary of research project awards through the end of FY 2004. It also includes FY 2005 accomplishments and planned FY 2005 activities. A summary of programmatic accomplishments is presented in Section 4. Also included is a summary of new and existing projects, an overview of the I-NERI program funding, and the new collaborations anticipated in FY 2005. The R&D work scope for current I-NERI collaborative projects with Canada, France, Japan, the Organization for Economic Cooperation and Development/Nuclear Energy Agency (OECD/NEA), and the Republic of Korea are presented in Sections 5 through 9, respectively. For each participating country, an index of projects and a summary of FY 2004

  1. AREVA - first half 2005 sales figures; AREVA - chiffre d'affaires du 1. semestre 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    First half 2005 sales for the AREVA group were up 1.1% to 5,396 million euros and 2.6% like-for-like, compared with 5,339 million euros for the same period in 2004.The change in foreign exchange rates had a negative impact of nearly (34) million euros between these two periods, which was much less than between the first half of 2003 and the same period in 2004. Sales are up 1.1% compared with the first half of 2004 (up 2.6% like-for-like); the euros (17.3) M impact of IFRS adoption is limited to the Front End division; Energy is up: Nuclear Power: up 4.4% (up 5.5% like-for-like), driven by the Front End and Reactors and Services divisions; T and D: down 3.9% (-2.1% like-for-like) due to the one time peak observed in early 2004; Connectors sales are stable (+0.3% like-for-like): Automotive performed well, while the communication market continued to be a difficult one.

  2. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  3. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  4. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  5. National Trends of Antiparkinsonism Treatment in Taiwan: 2004–2011

    Directory of Open Access Journals (Sweden)

    Weng-Ming Liu

    2016-01-01

    Full Text Available Background. Several guidelines for Parkinson’s disease (PD management were recently updated. We examined temporal trends for antiparkinsonism drugs in Taiwan. Methods. Antiparkinsonism prescriptions, including levodopa, ergot/nonergot dopamine agonists (DAs, amantadine, selegiline, entacapone, and anticholinergics, were identified in the Taiwan National Health Insurance Database from 2004 to 2011. Time trend analyses were estimated assuming Poisson distribution. Results. A total of 19,302 PD patients in 2004 and 41,606 PD patients in 2011 were analyzed. Antiparkinsonism prescriptions increased significantly from 187,137 in 2004 to 414,587 in 2011. Levodopa monotherapy or combination therapy was the mainstay. Levodopa monotherapy comprised 37.4% of prescriptions in 2004 and 44.2% in 2011, with an annual increase rate of 18.14%. There was a substantially increasing trend of DA prescriptions, which were higher in younger-aged patients (<60 years than in older-aged group (p=0.0006. Among combination therapy, DA combined with levodopa or other antiparkinsonism medications became the main combinations for younger-aged patients after 2009. After 2005, the proportion of ergot DA usage markedly decreased and PD patients using nonergot DA increased. Conclusions. Levodopa was the major treatment from 2004 to 2011. There was a steeply increased trend of DA use, especially in younger-aged patients. Nonergot agents comprised the major DA group after 2005.

  6. Nuclear power 2005: European report

    International Nuclear Information System (INIS)

    Anon.

    2006-01-01

    In 2005, nuclear power plants were operated and/or built in eighteen European countries. Thirteen of these countries are members of EU-25. Five of the ten countries joining the European Union on May 1, 2004 operate nuclear power stations. A total of 204 power reactors with a gross power of 181,030 MWe and a net power of 171,8479 MWe were in operation at the end of the year. In 2005, no nuclear power plant was commissioned. Two nuclear power plants were decommissioned in Europe in the course of 2005. In Germany the Obrigheim NPP and in Sweden the Barsebaeck 2 NPP have been permanently shut down due to political decisions. As a result of ongoing technical optimization in some plants, involving increases in reactor power or generator power as well as commissioning of plants of higher capacity, nuclear generating capacity increased by approx. 1.6 GW. In late 2005, five nuclear generating units were under construction in Finland (1), Romania (1), and Russia (3). 148 nuclear power plants were operated in thirteen states of the European Union (EU-25). They had an aggregate gross power of 137,023 MWe and a net power of 130,415 MWe, generating approx. 970 billion gross kWh of electricity in 2005, thus again contributing some 31% to the public electricity supply in the EU-25. In largest share of nuclear power in electricity generation is found in France (80%), followed by 72% in Lithuania, 55% in the Slovak Republic, 55% in Belgium, and 51% in Ukraine. In several countries not operating nuclear power plants of their own, such as Italy, Portugal, and Austria, nuclear power makes considerable contributions to public electricity supply as a result of electricity imports. (All statistical data in the country report apply to 2004 unless indicated otherwise. This is the year for which sound preliminary data are currently available for the states listed.) (orig.)

  7. Walla Walla River Fish Passage Operations Program, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-12-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2003-2004 project year, there were 379 adult summer steelhead (Oncorhynchus mykiss), 36 adult bull trout (Salvelinus confluentus); 108 adult and 3 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 21, 2003, and June 30, 2004. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by the WWBNPME project in order to radio tag spring chinook adults. A total of 2 adult summer steelhead, 4 bull trout, and 23 adult spring chinook were enumerated at the west ladder at Nursery Bridge Dam during the trapping operations between May 6 and May 23, 2004. Operation of the Little Walla Walla

  8. Status and prospects for gas cooled reactor fuels. Proceedings of two IAEA meetings held in June 2004 and June 2005

    International Nuclear Information System (INIS)

    2009-04-01

    Recently, efforts to develop high temperature gas cooled reactors with an aim to building futuristic nuclear energy systems with advanced nuclear fuel cycles in the context of the Generation IV International Forum have increased significantly. In addition, several development projects are ongoing, focusing on the burning of weapons grade plutonium, including civil plutonium and other transuranic elements using the 'deep-burn concept', or 'inert matrix fuels', especially in the form of coated particles in gas cooled reactor systems. There is also considerable global interest in developing 'nuclear hydrogen' energy systems using high temperature gas cooled reactors. Apart from these developments, the value of preserving the large technology base developed in Germany, the United Kingdom and the United States of America, as well as information developed in other countries, has also been a subject of interest to the IAEA. At the second annual meeting of the 'technical working group on nuclear fuel cycles options and spent fuel management' (TWG-NFCO), held in Vienna from 28-30 May 2003, it was recommended to hold a technical meeting on Current Status and Future Prospects of Gas Cooled Reactor Fuels. The meeting should cover the technological progress that has been made in the last three years and plan future fabrication and qualification facilities for GCR/HTR fuel. TWG-NFCO considered it timely that this progress should be presented and discussed in the interested community. Recognizing the numerous activities being pursued in many Member States, the IAEA convened the technical meeting on this topic in June 2004 in Vienna. Consequently, an update meeting was held in June 2005, which was hosted by the Kharkov Institute of Physics and Technology of Ukraine to review and integrate the latest developments. This publication combines the results of the technical meeting of June 2004 and the meeting of June 2005. The proceedings presented here contain 25 in depth papers on the

  9. Bonneville Power Administration 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  10. The main fiscal dispositions in the domain of energy and mineral raw materials as foreseen by the 2005 finances law and by the last 2004 amended law

    International Nuclear Information System (INIS)

    2004-01-01

    This short paper summarizes in tables the main changes made in the 2005 French finances law and in the 2004 amended law about: the domestic tax on petroleum products (TIPP), the general tax on polluting activities (TGAP), the bio-fuel production units, the tax credits for the implementation of renewable energies in dwellings, the domestic tax on natural gas consumptions (TICGN) for greenhouse owners, the European harmonization of the added-value tax (TVA), the taxes on companies (IS), and the electric utility charges (CSPE). (J.S.)

  11. Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

    DEFF Research Database (Denmark)

    Makarov, Yuri V.; Yang, Bo; DeSteese, John G.

    2009-01-01

    This paper addresses the issue of mitigating additional intermittency and fast ramps that are expected to occur at high penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator...

  12. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  13. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  14. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  15. Nuclear power plants: 2005 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2006-01-01

    Nuclear power plants were available for power supply and under construction, respectively, in 32 countries of the world as per end of 2005. A total of 444 nuclear power plants, i.e. three plants more than at the end of 2004, with an aggregate gross power of approx. 389 GWe and an aggregate net power of 370 GWe, respectively, were in operation in 31 countries. The available capacity of nuclear power plants increased by some 4,5 GWe as a result of the capacities added by the four newly commissioned units of Higashidori 1 (Japan), Shika 2 (Japan), Tarapur 4 (India), and Tianwan 1 (China). In addition, unit A-1 of the Pickering nuclear power station in Canada, with 825 MWe, was restarted after a downtime of several years. Two plants were decommissioned for good in 2005: Obrigheim in Germany, and Barsebaeck 2 in Sweden. 23 nuclear generating units, i.e. one unit more than in late 2004, with an aggregate gross power of approx. 19 GWe were still under construction in nine countries by late 2005. In Pakistan, construction of a new project, Chasnupp 2, was started; in China, construction was begun of two units, Lingao Phase 2, units 3 and 4, and in Japan, the Shimane 3 generating unit is being built. (orig.)

  16. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  17. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  18. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  19. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  20. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  1. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  2. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  3. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  4. [Effects of self-adapting G-DRG system 2004 to 2006 on in-patient services payment in pediatric hematology and oncology patients of a university hospital].

    Science.gov (United States)

    Christaras, A; Schaper, J; Strelow, H; Laws, H-J; Göbel, U

    2006-01-01

    Reimbursement of inpatient treatment by daily constant charges is replaced by diagnosis- and procedure-related group system (G-DRG) in German acute care hospitals excerpt for psychiatry since 2004. Re-designs of G-DRG system were undertaken in 2005 and 2006. Parallel to implementation requirement- and resource-based self-adjustment of this new reimbursement system has been established by law. Adjustments performed in 2005 and 2006 are examined with respect to their effect on reimbursements in treatments of children with oncological, hematological, and immunological diseases. An unchanged population of 349 patients associated with 1,731 inpatient stays of a Clinic of Pediatric Oncology, Hematology, and Immunology in 2004 was analyzed by methods and means of G-DRG systems 2004, 2005, and 2006. DRGs and additional payments for drugs and procedures eligible for all and/or individual hospitals were calculated. G-DRG system 2005 resulted in overall reimbursement loss of 3.77 % compared to G-DRG 2004. G-DRG 2006 leads to slightly improved overall reimbursements compared to G-DRG 2005 by increasing DRG-based revenues. G-DRG 2006 effects 2.40 % reduction in overall reimbursement compared to G-DRG 2004. This loss includes ameliorating effects of additional payments for drugs and blood products already. Despite introduction of additional payments especially designed for children and teenagers in 2006, additional payment volume is decreased by 21.71 % from 2005 to 2006. G-DRG 2006 yields over-all reimbursement losses of 1.45 % in comparison to G-DRG 2004. Overall reimbursements include introduced additional payments for drugs and blood products. (Reimbursements resulting out of DRG payment alone drop by 14.73 % from 2004 to 2005, and increase by 3.26 % from 2005 to 2006 (2004 vs. 2006 11.95 %). Introduction of additional payments for drugs and blood products on a Germany-wide basis introduced in 2005 dampens DRG-based reimbursement losses. Despite introduction of dosage

  5. Slovensky plynarensky priemysel. Annual report 2004

    International Nuclear Information System (INIS)

    2005-01-01

    This Annual Report contains the review of the results of the joint stock company Slovensky plynarensky priemysel (SPP - Slovak Gas Industry) in relation to the year 2004. This report contains the following headings: (1) Statement by the Chairman of the Board of Directors; (2) Statement by the General Director; (3) ProgRes SPP - Profile of Changes; (4) Organisational Chart applicable since 1-st January 2005; (5) Board of Directors; (6) Supervisory Board; (7) Executive Management; (8) Business Activities; (9) Economic and Financial Highlights; (10) Capital Structure of Financial Sources Covering Assets; (11)Natural Gas Trade; (12) Natural Gas Distribution; (13) International Transmission of Natural Gas; (14) Human Resources; (15) Equity Holdings; (16) 2004 Summary Results; (17) Auditor's Report; (18) Environmental Protection; (19) Charity, Sponsoring, SPP Foundation; (20) Selected data from consolidated international financial statements for the year ended 31 December 2004 and Independent Auditor's Report

  6. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  7. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities -- 1995. Annual report 1995

    International Nuclear Information System (INIS)

    Martinson, R.D.; Graves, R.J.; Langeslay, M.J.; Killins, S.D.

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams

  8. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  9. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  10. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  11. Design and operation of the 30-MJ superconducting magnetic-storage system on the Bonneville Power Administration bus

    International Nuclear Information System (INIS)

    Schermer, R.I.; Barron, M.H.; Boenig, H.J.

    1983-01-01

    A superconducting magnetic-energy-storage (SMES) unit is suitable for power-system stabilization because it can provide positive damping by absorbing or releasing energy with a relatively fast response time, 10 ms. In the fall of 1982, an SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration as an experiment in monitoring, predicting and improving system stability. This paper reports principally on the system testing

  12. Understanding Hydrological Regime Alterations Caused by dams: the Santiago River case in the Andean Region of the Amazon Basin.

    Science.gov (United States)

    Rosero-Lopez, D.; Flecker, A.; Walter, M. T.

    2016-12-01

    Water resources in South America have been clearly targeted as key sources for hydropower expansion over the next 30 years. Ecuador, among the most biologically diverse countries in the world, has the highest density of hydropower dams, either operational, under construction, or planned, in the Amazon Basin. Ecuador's ambitious plan to change its energy portfolio is conceived to satisfy the country's demand and to empower the country to be the region's first hydroelectric energy exporter. The Santiago watershed located in the southeast part of the country has 39 facilities either under construction or in operation. The Santiago River and its main tributaries (Zamora and Upano) are expected to be impounded by large dams over the next 10 years. In order to understand the magnitude and potential impacts of regional dam development on hydrological regimes, a 35-year historical data set of stream discharge was analyzed. We examined flow regimes for time series between the construction of each dam, starting with the oldest and largest built in 1982 up until the most recent dam built in 2005. Preliminary results indicate a systematic displacement in flow seasonality following post-dam compared to pre-dam conditions. There are also notable differences in the distributions of peaks and pulses in post-dam flows. The range of changes from these results shows that punctuated and cumulative impacts are related to the size of each new impoundment. These observations and their implications to the livelihoods, biota, and ecosystems services in the Santiago watershed need to be incorporated into a broader cost-benefit analysis of hydropower generation in the western Amazon Basin.

  13. Performance appraisal and advancement exercise 2005

    CERN Multimedia

    Human Resources Department

    2004-01-01

    The 2005 performance appraisal and advancement exercise will start in the usual way with annual interviews between staff and their supervisors. These interviews should be held in the period from 15 November 2004 to 15 February 2005 [see Administrative Circular No 26 (Rev. 5) Annex II, § 3. For this exercise, the paper MAPS form has been replaced by an electronic form in the EDH system, which is available via EDH (on the EDH desktop under Other Tasks / HR & Training) No changes have been made to the contents of the form. HR Department will shortly provide further information on this subject. Human Resources Department Tel. 73566

  14. Surface water leakage, sedimentation and evaporation in arid regions: A case study of the Gargar dam, Algeria

    Directory of Open Access Journals (Sweden)

    Hassen Benfetta

    2017-12-01

    Full Text Available This study was carried out in order to assess the total capacity loss in Gargar dam, third-largest in Algeria, due to the mudding of the reservoir, intense evaporation and water leaks. We analysed the variation in leakage as a function of the reservoir level, and quantify losses due to leaks, sedimentation and evaporation. We relied on site visits and data obtained from the Algerian Agency for Dams and Transfers to assess the leakage volume; reservoir level; sedimentation and evaporation levels for the period 1988–2015. We present an updated report of this problem through the dam. We estimated total average losses of 23 million m3·year−1 for the period 1988–2015, made up of leakage (0.3 million m3·year−1, evaporation (18 million m3·year−1 and dead storage for 4.6 million m3·year−1. However, total losses for 2004 were estimated at 113.9 million m3, which increased to the alarming value of 166.8 million m3 in 2015. We suggest improving the waterproofness by a concrete screen, and reducing mudding and evaporation by reforestation, to increase the storage capacity of the dam.

  15. Kalapüük ja -varud : [2000-2005 Eestis] / Vahur Võrel

    Index Scriptorium Estoniae

    Võrel, Vahur

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 47-49. Kalapüügi mahust enamiku ehk 75% moodustab Läänemere kalapüük. Diagramm: Kalapüügi ja kalakasvatuse struktuur 2003. a (% kogumahust). Tabelid: Püügikogused ja väärtused 2000-2002; Läänemere püügikvoodid

  16. Energy in Sweden 2004

    International Nuclear Information System (INIS)

    2004-11-01

    Energy in Sweden is published annually by the Swedish Energy Agency. Energy in Sweden 2004, together with its statistics supplement, Energy in Sweden: Facts and Figures 2004, is intended to provide decision-makers, journalists and the public with a single source of easily available information on conditions and developments in the energy sector. In recent years, Swedish energy and environmental policy has been increasingly concentrated on establishing or improving the long-term conditions for efficient energy markets and efficient use of energy. Restructuring of the Swedish electricity market, greater internationalisation and the effects of the energy system on the wider environment and on climate are important factors that influence the direction of energy policy and so also development of the energy markets. The line that was started by the 2002 Energy Policy Agreement, under the name of Working Together for a Reliable, Efficient and Environmentally Aware Energy Supply (Bill no. 2001/02:143), continues. The shift in taxation policy to encourage the move towards a sustainable energy system and reduced environmental impact continues, as exemplified by the introduction of the electricity certificate system on 1st May 2003. The negotiations that were started in 2003 with a view to progressive shut-down of nuclear power generation were broken off in October 2004 without having reached agreement with the nuclear power companies. As soon as the breakdown of the negotiations was announced, the Government, together with the Left Party and the Centre Party, stated that Barsebaeck 2 will be closed in 2005. Sweden's climate policy is based on the Climate Strategy Act (Bill no. 2001/02:55), which was adopted by Parliament in March 2002. It is expected that trading in emission rights, in accordance with the EU Emissions Trading Directive, will start in January 2005, with publication of national emission rights allocations on 30th September 2004. One of the more important tasks

  17. Dissolved inorganic carbon, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using CTD, bottle and other instruments from the DISCOVERY in the Indian Ocean from 2004-12-13 to 2005-01-21 (NODC Accession 0113538)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0113538 includes chemical, discrete sample, physical and profile data collected from DISCOVERY in the Indian Ocean from 2004-12-13 to 2005-01-21 and...

  18. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  19. Defining ecological and economical hydropoweroperations: a framework for managing dam releasesto meet multiple conflicting objectives

    Science.gov (United States)

    Irwin, Elise R.

    2014-01-01

    Hydroelectric dams are a flexible source of power, provide flood control, and contribute to the economic growth of local communities through real-estate and recreation. Yet the impoundment of rivers can alter and fragment miles of critical riverine habitat needed for other competing needs such as downstream consumptive water use, fish and wildlife population viability, or other forms of recreation. Multiple conflicting interests can compromise progressive management especially with recognized uncertainties related to whether management actions will fulfill the objectives of policy makers, resource managers and/or facility owners. Decision analytic tools were used in a stakeholder-driven process to develop and implement a template for evaluation and prediction of the effects of water resource management of multiple-use systems under the context provided by R.L. Harris Dam on the Tallapoosa River, Alabama, USA. The approach provided a transparent and structured framework for decision-making and incorporated both existing and new data to meet multiple management objectives. Success of the template has been evaluated by the stakeholder governing body in an adaptive resource management framework since 2005 and is ongoing. Consequences of management of discharge at the dam were evaluated annually relative to stakeholder satisfaction to allow for adjustment of both management scenarios and objectives. This template can be applied to attempt to resolve conflict inherent in many dam-regulated systems where management decisions impact diverse values of stakeholders.

  20. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  1. Matahina Dam : lessons learned from an earthquake-related internal erosion incident at the Matahina Dam, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Gillon, M. [Damwatch Services Ltd., Wellington (New Zealand)

    2009-07-01

    This case history discussed internal erosion damage and crest subsidence caused by an earthquake at the Matahina Dam in New Zealand. The study showed that cracking and internal erosion was initiated during the 1967 reservoir filling operation. Located in an area of active volcanism and faulting, the dam is located on a river with extensive erosion through an ignimbrite flow. The dam's core is founded on compact Tertiary age sediments overlain by sand and gravel deposits beneath the shoulders of the dam. The earthquake caused a rupture along an unidentified fault trace 12 km from the dam. The horizontal base acceleration recorded at the dam was 3.25 m/s. Transverse cracking was observed at each abutment, and deformations were observed in the rockfill. An investigation program was conducted to determine the dam's integrity. Piezometer measurements showed widespread fluctuations. It was concluded that the lack of an effective filter was a significant design omission. 12 refs., 12 figs.

  2. AREVA - first half 2005 sales figures

    International Nuclear Information System (INIS)

    2005-07-01

    First half 2005 sales for the AREVA group were up 1.1% to 5,396 million euros and 2.6% like-for-like, compared with 5,339 million euros for the same period in 2004.The change in foreign exchange rates had a negative impact of nearly (34) million euros between these two periods, which was much less than between the first half of 2003 and the same period in 2004. Sales are up 1.1% compared with the first half of 2004 (up 2.6% like-for-like); the euros (17.3) M impact of IFRS adoption is limited to the Front End division; Energy is up: Nuclear Power: up 4.4% (up 5.5% like-for-like), driven by the Front End and Reactors and Services divisions; T and D: down 3.9% (-2.1% like-for-like) due to the one time peak observed in early 2004; Connectors sales are stable (+0.3% like-for-like): Automotive performed well, while the communication market continued to be a difficult one

  3. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  4. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  5. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-04-03

    This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2004, to June 30, 2005. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the Geomechanical Monitoring Program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists the references and bibliography.

  6. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1

    International Nuclear Information System (INIS)

    2006-01-01

    This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2004, to June 30, 2005. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the Geomechanical Monitoring Program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists the references and bibliography.

  7. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  8. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    Science.gov (United States)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  9. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  10. Radioactive waste management profiles. A compilation of data from the Net Enabled Waste Management Database (NEWMDB). No. 7, December 2005 (last updated 2005.12.15)

    International Nuclear Information System (INIS)

    2005-12-01

    This Profiles report is based on data collected using the NEWMDB from May to October 2005. The report was first published on line within the NEWMDB December 2005. Starting with NEWMDB version II (introduced January 2004) individual reports can be updated after a Profiles report is published. Please refer to the Profiles bookmark; the page that is accessed via this bookmark lists revisions to individual Profiles (if there are any)

  11. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  12. PRESSÃO CAMBIAL E A DECISÃO DE INTERNACIONALIZAÇÃO:O CASO MARCOPOLO NO PERÍODO 2004/2005

    Directory of Open Access Journals (Sweden)

    LEONARDO NELMI TREVISAN

    2006-01-01

    Full Text Available Este trabalho examina procedimentos de internacionalização de empresa brasileira,a Marcopolo, ao longo dos anos de 2004 e 2005.O objetivo não é debater aspectosconjunturais (pressão cambial, essencialmente mas acompanhar decisões organizacionaistomadas a partir dela. Internacionalização de empresas obedece a dois quadros teóricos: oeconômico e o organizacional. Estudo com 76 empresas brasileiras que operam em mercadosinternacionais mostrou a presença da “interpretação gradualista da Escola de Uppsala”, mas“resultados superiores” ocorrem com desempenho global e menor dependência ao mercadodoméstico. A adesão ao “paradigma eclético de produção internacional” ocorreu na Marcopoloque procurou além fronteiras os meios de obter "margens mais adequadas" de lucros. Ainternacionalização da Marcopolo foi menos um processo de ação comportamental e mais umareação às condições de produção locais adversas.

  13. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  14. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  15. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  16. Racismo en el fútbol profesional español (1ª y 2ª división. Temporadas 2004-05 y 2005-06. (Racism in the Spanish professional football (1st and 2nd division. Seasons 2004-05 and 2005-06.

    Directory of Open Access Journals (Sweden)

    Rodrigo Pardo García

    2008-07-01

    Full Text Available ResumenEn la presente investigación se analizan los incidentes racistas ocurridos en los partidos de liga del fútbol profesional español en 1ª y 2ª división durante las temporadas 2004-05 y 2005-06. Para realizar dicho análisis se han empleado tres fuentes oficiales: 1. Actas de la Comisión Nacional contra la Violencia en los Espectáculos Deportivos, 2. Informes trimestrales realizados por la Oficina Nacional del Deporte perteneciente a la Dirección General de la Policía, y 3. Actas arbitrales. Los resultados muestran cómo el número total de incidentes racistas se mantuvo prácticamente constante en ambas temporadas aunque en 2ª división el número de incidentes se duplicó. En cuanto a la tipología de los incidentes recogidos, el 79% hace relación a conductas e insultos racistas mientras que el 21% restante se refiere a la exhibición de simbología de carácter racista. También se muestran datos de los clubes cuyos seguidores han ocasionado más incidentes racistas; cuántos de esos incidentes fueron protagonizados por grupos ultras; así como el número de personas implicadas y las propuestas de sanción realizadas por la Comisión Nacional contra la Violencia. Por último se reflejan los colegiados que recogieron en sus actas arbitrales incidentes racistas y/o xenófobos. Abstract This investigation analyzes the racist incidents occurred during spanish proffesional football games of the 1st and 2nd division in the seasons 2004-05 and 2005-06. To conduct such analysis it was used three official sources: 1. Minutes of the National Committee against Violence in Public Spectacles, 2. Quarterly reports elaborated by the Sport National Bureau belonging to the Police National Department, and 3. Referees’ minutes. Results show how the total number of racist incidents was practically the same in both seasons, however in the 2nd division the number of incidents was twice as compared to the 1st division. Regarding the typology of

  17. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  18. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  19. Impact of uranium exploitation by Cogema-Areva subsidiaries in Niger. Assessment of analyses performed by the CRIIRAD laboratory in 2004 and at the beginning of 2005

    International Nuclear Information System (INIS)

    2005-01-01

    After a description of the uranium exploitation context (involved companies, production) in Arlit, Niger, by Cogema-Areva subsidiary companies, this report describes the context of controls performed by the CRIIRAD laboratory. Then, it reports and comments the contamination of underground so-called drinkable waters (contamination risks, Cogema statement, detection of a rather high concentration of alpha emitters, measurements performed in 2004 and 2005). The authors notice that water contamination is known by Cogema. Then, the report analyzes the issue of contaminated scrap metal dispersal, comments and criticizes the attitude of Cogema with respect to the associated risks. It comments the uranate transport accident which occurred in February 2004, the subsequent contamination, actions performed by Cogema, the associated health risks, and the statements made by Areva and Cogema. It also comments and analyzes the risks related to radioactive radon dusts inhalation around different sites and because of some technical practices, and Cogema statements about this issue. In conclusion, the authors outline the need of reinforced controls and of an epidemiological study, and outlines how Areva propagates wrong ideas

  20. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  1. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  2. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  3. Severe pediatric influenza in California, 2003-2005: implications for immunization recommendations.

    Science.gov (United States)

    Louie, Janice K; Schechter, Robert; Honarmand, Somayeh; Guevara, Hugo F; Shoemaker, Trevor R; Madrigal, Nora Y; Woodfill, Celia J I; Backer, Howard D; Glaser, Carol A

    2006-04-01

    The 2003-2004 influenza season was marked by both the emergence of a new drift "Fujian" strain of influenza A virus and prominent reports of increased influenza-related deaths in children in the absence of baseline data for comparison. In December 2003, the California Department of Health Services initiated surveillance of children who were hospitalized in California with severe influenza in an attempt to measure its impact and to identify additional preventive measures. From December 2003 to May 2005, surveillance of children who were hospitalized in PICUs or dying in the hospital with laboratory evidence of influenza was performed by hospital infection control practitioners and local public health departments using a standardized case definition and reporting form. In the 2003-2004 and 2004-2005 influenza seasons, 125 and 35 cases, respectively, of severe influenza in children were identified in California. The mean and median age of cases were 3.1 years and 1.5 years, with breakdown as follows: AAP) recommendations for immunization, but only 8 had been vaccinated. More than 3 times as many children were reported to be hospitalized in intensive care with influenza in California during the 2003-2004 season compared with the 2004-2005 season. Because children who are younger than 6 months remain at highest risk for severe influenza yet cannot currently be immunized, development and validation of preventive measures for them (eg, maternal immunization, breastfeeding, immunization of young infants and their close contacts) are urgently needed. ACIP's recent recommendation for influenza vaccination of children with conditions that can compromise respiratory function (eg, cognitive dysfunction, spinal cord injuries, seizure disorders, other neuromuscular disorders) is further supported by the frequency of underlying neurologic disease in these cases of severe influenza. A significant proportion of children with severe influenza in California, including children who are

  4. Energy balances 2005

    International Nuclear Information System (INIS)

    Anon.

    2006-01-01

    Denmark's energy consumption was 800 PJ in 2005 when corrected for the fuel consumption used for producing electricity for export. The consumption is 0,5 % higher than in 2004. Since 1975, the energy consumption has been on the same level with minor fluctuations which are mainly due to the climate. The energy balances is an account of production, import and export, and consumption of energy. The consumption is accounted as physical amounts as well as gross consumption. Also, accounts are presented of the costs of energy in basis prices and in market prices, including excises on energy, CO 2 , and SO 2 . (LN)

  5. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  6. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  7. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  8. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  9. Exploration and excavation of shipwrecks in Goa and adjoining waters 2004-2005

    Digital Repository Service at National Institute of Oceanography (India)

    Anon

    As a part of the Institutional Project, 'Application of geological and geophysical methods in marine archaeology and underwater explorations' (STS 0004), exploration and excavation of shipwrecks have been carried out from Nov 24-Dec 02, 2005 for 06...

  10. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities - 1996. Annual report

    International Nuclear Information System (INIS)

    Martinson, R.D.; Graves, R.J.; Mills, R.B.; Kamps, J.W.

    1997-08-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1996 The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville Dams. Monitoring data collected included: river conditions; total numbers of fish; numbers of fry, adult salmon, and incidental catch; daily and seasonal passage patterns; and fish condition. 10 refs., 16 figs., 5 tabs

  11. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  12. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  13. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  14. 75 FR 57063 - Distribution of the 2004 and 2005 Cable Royalty Funds

    Science.gov (United States)

    2010-09-17

    ..., Huron Consulting Group, Tr. at 36-37; John F. Wilson, Senior Vice President & Chief TV Programming... 1529; Jonda K. Martin, id. at 1529-30; Dr. Martin R. Frankel, Professor of Statistics and Computer...\\ regarding certain programming on Station WGN-TV (Chicago, Illinois) during the years 1998-99 and 2004-05...

  15. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  16. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  17. 2005. aasta arhitektuurivõistlused

    Index Scriptorium Estoniae

    2005-01-01

    Tulemused: Viljandi Metsakalmistu kabel: I - Andres Lember (Male Arhitektid); Tartu Vabaduse sild: I - Stanislav Shulman, Oleg Samohhin (Peterburi, Transmost); Tartu Mõisavahe kvartali hoonestuskava: I .- Ott Kadarik, Villem Tomiste, Mihkel Tüür (Kosmos); Seewaldi ala planeerimine: I - Jüri Martson, Rasmus Reinolt, Ivo-Martin Veelma (Lokomotiiv); Rotermanni kvartali arhitektuurivõistlus: I - Kosmos; aasta betoonehitis 2004: Ülemiste hotell Tallinnas, Martin Aunin; Lasnamäe Jumalaema kirik: I - Oleg Zhemtshugov (AB Z-Projekt), Nikolai Djatko, Jevgeni Kolomenkin; Pärnu vanalinna ja rannapiirkonna tänavakaubanduse inventari ja jäätmejaamade kujundus: I - Peeter Varrak; Kihnu sadamaala planeerimise ja hoonestamise ideevõistlus: I - Siiri Vallner, Kaire Nõmm, Helina Lass, Anna-Liisa Unt (Kavakava); Narva kolledzhi uus hoone: I - Katrin Koov, S. Vallner (Kavakava) ja Indrek Peil (Head Arhitektid); Randvere algkooli hoone: II - Inga Raukas (Arhitektuuriagentuur); Tartu Toomemäe valgustuse ja arhitektuursete väikevormide ideevõistlus: II - K. Koov ja Heidi Urb (Kabvakava) ning Maarja Kask, Ralf Lõoke, Karli Luik (Salto); Metsakalmistu arhitektide kalmeala: I - M. Kask, R. Lõoke; Skoone bastioni ideevõistlus: I - M. Kask, R. Lõoke, K. Luik (Salto); Mahtra talurahvamuuseum: I -Tomomi Hayashi, Hanno Grossschmidt; parim eramu 2004-2005: metallmaja Tabasalus, Muru & Pere; Tallinna loomaaia läänevärav: I - I. Raukas, Monika Löve, Oliver Soomets; parim puitehitis 2005: Naba lasteaed Pirital, arhitektid Vahur Sova, Lauri Saar, sisearhitekt Mari Tosmin; Pae karjääri revitaliseerimine: III - Veronika Valk, Kerli Raamsalu

  18. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  19. Water Use in Florida, 2005 and Trends 1950-2005

    Science.gov (United States)

    Marella, Richard L.

    2008-01-01

    Water is among Florida's most valued resources. The State has more than 1,700 streams and rivers, 7,800 freshwater lakes, 700 springs, 11 million acres of wetlands, and underlying aquifers yielding quantities of freshwater necessary for both human and environmental needs (Fernald and Purdum, 1998). Although renewable, these water resources are finite, and continued growth in population, tourism, and agriculture will place increased demands on these water supplies. The permanent population of Florida in 2005 totaled 17.9 million, ranking fourth in the Nation (University of Florida, 2006); nearly 86 million tourists visited the State (Orlando Business Journal, 2006). In 2005, Florida harvested two-thirds of the total citrus production in the United States and ranked fifth in the Nation net farm income (Florida Department of Agriculture and Consumer Services, 2006). Freshwater is vital for sustaining Florida's population, economy, and agricultural production. Accurate estimates reflecting water use and trends in Florida are compiled in 5-year intervals by the U.S. Geological Survey (USGS) in cooperation with the Florida Department of Environmental Protection (FDEP) and the Northwest Florida, St. Johns River, South Florida, Southwest Florida, and Suwannee River Water Management Districts (Marella, 2004). This coordinated effort provides the necessary data and information for planning future water needs and resource management. The purpose of this fact sheet is to present the highlights of water use in Florida for 2005 along with some significant trends in withdrawals since 1950.

  20. Natural dam failure in the eastern slope of the Central Andes of Argentina. Numerical modelling of the 2005 Santa Cruz river outburst flood

    Science.gov (United States)

    Penna, I.; Daicz, S.; Zlotnik, S.; Derron, M.-H.; Jaboyedoff, M.

    2012-04-01

    In the Central Andes of Argentina, ephemeral river blockage due to landslides deposition are common phenomena. During the first fortnight of January 2005, 11.5 * 106m3 of rock collapsed from the east slope of the Santa Cruz valley (San Juan province, Argentina). The rock mass displaced from 4300 m a.s.l., down to the valley bottom, at 2900 m a.s.l., and ran up the opposite flank of the valley. This produced the blockage of the Santa Cruz river and generated the Los Erizos lake. The rapid snow melting during the spring season caused the increase of the water level of the reservoir, leading to a process of overtopping on November 12th of 2005. 30 * 106m3 of water were released from the reservoir and the consequent outburst flood displaced along 250 km. From local reports of arrival times, we estimated that the outburst flood reduced its velocity from around 40 km/h near the source area to 6 km/h in its distal section. A road, bridges, and a mining post where destroyed. 75 tourists had to be rescued from the mountains using helicopters, and people from two localities had to be evacuated. Near its distal part, the flood damaged the facilities of the Caracoles power dam, which was under construction, and its inauguration had to be delayed one year due to the damage. The outburst flood produced changes in the morphology of the valley floor along almost all its path (erosion of alluvial fans, talus and terraces, and deposition of boulders). The most significant changes occurred in the first 70 km, especially upstream narrow sections, showing the importance of the backwater effects due to hydraulic ponding. In this work we carried out numerical simulations to obtain the velocity patterns of the flood, and compared them with those obtained from local reports. Furthermore, we analyze the relationship between the dynamics of the flood with the patterns of erosion and deposition near the source area.

  1. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  2. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  3. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2003-03-01

    This report presents results for year eleven in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible.

  4. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Will [comp.

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.

  5. Management Plan for Experimental Reintroduction of Sockeye into Skaha Lake; Proposed Implementation, Monitoring, and Evaluation, 2004 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wright, Howie; Smith, Howard (Okanagan Nation Alliance, Fisheries Department, Westbank, BC, Canada)

    2004-01-01

    Okanagan River sockeye salmon, which spawn near the town of Oliver, B.C., have their farther upstream migration limited by several water control and diversion dams. Stock numbers have been declining for many years and the Okanagan Native Alliance Fisheries Department (ONAFD) has been the principal advocate of a program to restore their numbers and range by reintroducing them into upstream waters where they may once have occurred in substantial numbers Some investigators have warned that without effective intervention Okanagan sockeye are at considerable risk of extinction. Among a host of threats, the quality of water in the single nursery areas in Osoyoos Lake. is deteriorating and a sanctuary such as that afforded in larger lakes higher in the system could be essential. Because the proposed reintroduction upstream has implications for other fish species, (particularly kokanee, the so-called ''landlocked sockeye'' which reside in many Okanagan lakes), the proponents undertook a three-year investigation, with funding from the Bonneville Power Administration and the Confederated Tribes of the Colville Reservation, to identify possible problem areas, and they committed to an interim experimental reintroduction to Skaha Lake where any problems could be worked out before a more ambitious reintroduction, (e.g. to Okanagan Lake) could be formally considered. The three-year investigation was completed in the spring of 2003. It included an assessment of risks from disease or the possible introduction of unwanted exotic species. It also considered the present quality and quantity of sockeye habitat, and opportunities for expanding or improving it. Finally ecological complexity encouraged the development of a life history model to examine interactions of sockeye with other fishes and their food organisms. While some problem areas were exposed in the course of these studies, they appeared to be manageable and the concept of an experimental reintroduction

  6. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  7. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  8. Waste statistics 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-04-07

    The 2004 reporting to the ISAG comprises 394 plants owned by 256 enterprises. In 2003, reports covered 403 plants owned by 273 enterprises. Waste generation in 2004 is compared to targets for 2008 in the government's Waste Strategy 2005-2008. The following summarises waste generation in 2004: 1) In 2004, total reported waste arisings amounted to 13,359,000 tonnes, which is 745,000 tonnes, or 6 per cent, more than in 2003. 2) If amounts of residues from coal-fired power plants are excluded from statistics, waste arisings in 2004 were 12,179,000 tonnes, which is a 9 per cent increase from 2003. 3) If amounts of residues from coal-fired power plants and waste from the building and construction sector are excluded from statistics, total waste generation in 2004 amounted to 7,684,000 tonnes, which is 328,000 tonnes, or 4 per cent, more than in 2002. In other words, there has been an increase in total waste arisings, if residues and waste from building and construction are excluded. Waste from the building and construction sector is more sensitive to economic change than most other waste. 4) The total rate of recycling was 65 per cent. The 2008 target for recycling is 65 per cent. The rate of recycling in 2003 was also 65 per cent. 5) The total amount of waste led to incineration amounted to 26 per cent, plus an additional 1 per cent left in temporary storage to be incinerated at a later time. The 2008 target for incineration is 26 per cent. These are the same percentage figures as applied to incineration and storage in 2003. 6) The total amount of waste led to landfills amounted to 8 per cent, which is one percentage point better than the overall landfill target of a maximum of 9 per cent landfilling in 2008. Also in 2003, 8 per cent of the waste was landfilled. 7) The targets for treatment of waste from individual sectors are still not being met: too little waste from households and the service sector is being recycled, and too much waste from industry is being

  9. Fast changes in seasonal forest communities due to soil moisture increase after damming

    Directory of Open Access Journals (Sweden)

    Vagner Santiago do Vale

    2013-12-01

    Full Text Available Local changes caused by dams can have drastic consequences for ecosystems, not only because they change the water regime but also the modification on lakeshore areas. Thus, this work aimed to determine the changes in soil moisture after damming, to understand the consequences of this modification on the arboreal community of dry forests, some of the most endangered systems on the planet. We studied these changes in soil moisture and the arboreal community in three dry forests in the Araguari River Basin, after two dams construction in 2005 and 2006, and the potential effects on these forests. For this, plots of 20m x10m were distributed close to the impoundment margin and perpendicular to the dam margin in two deciduous dry forests and one semi-deciduous dry forest located in Southeastern Brazil, totaling 3.6ha sampled. Besides, soil analysis were undertaken before and after impoundment at three different depths 0-10, 20-30 and 40-50cm. A tree minimum DBH of 4.77cm community inventory was made before T0 and at two T2 and four T4 years after damming. Annual dynamic rates of all communities were calculated, and statistical tests were used to determine changes in soil moisture and tree communities. The analyses confirmed soil moisture increases in all forests, especially during the dry season and at sites closer to the reservoir; besides, an increase in basal area due to the fast growth of many trees was observed. The highest turnover occurred in the first two years after impoundment, mainly due to the higher tree mortality especially of those closer to the dam margin. All forests showed reductions in dynamic rates for subsequent years T2-T4, indicating that these forests tended to stabilize after a strong initial impact. The modifications were more extensive in the deciduous forests, probably because the dry period resulted more rigorous in these forests when compared to semideciduous forest. The new shorelines created by damming increased soil

  10. Annual variation of hematology and plasma chemistry in shortnose sturgeon, Acipenser brevirostrum, during a dam-impeded spawning run.

    Science.gov (United States)

    Matsche, Mark A; Gibbons, Jarrett

    2012-12-01

    Shortnose sturgeon (Acipenser brevirostrum) spawning migrations on the Cooper River are impeded by Pinopolis Dam, Lake Moultrie, South Carolina. Sturgeon and other species aggregate below the dam in late winter/early spring and are subjected to a variety of stressors stemming from crowding, poor habitat quality, and injuries that appear to be caused by boat propeller or turbine strikes. Spawning has been documented in the tailrace, but reproductive success has not been verified as no juveniles have been captured. Fish within the dam tailrace were captured by gill net during winter, 2005 and 2007-2011, and physiological condition was assessed using a panel of hematologic and biochemical indices. Plasma phosphorus and calcium were significantly higher in females, while PCV and aspartate aminotransferase were significantly higher in males, indicating sex-specific physiological changes triggered during maturity. A marked leucopenia, accompanied by lymphopenia and neutrophilia, was evident in both sexes and was consistent across years, indicating that these fish were under chronic stress. Testosterone and estradiol levels and hematologic and biochemical reference intervals are provided for comparative purposes.

  11. The 2005 energy year in Finland: Electricity consumption down

    International Nuclear Information System (INIS)

    2006-01-01

    Electricity consumption declined by 2.5% in 2005, largely as a result of a six-week labour dispute in the paper indusry and mild weather conditions, according to a report on energy industry develop rents in 2005 published by Finnish Energy Industries. Over the longer term, energy consumption is forecast to grow by close to 2% a year. Water levels in waterways and water systems across the Nordic countries returned to normal in 2005 after a long period of reduced resources, stabilising hydropower output generally Following high levels of electricity exports westwards in 2004, electricity imports from the West reached almost record levels in Finland in 2005. Together with imports from Russia, Finland imported more electricity last year than ever before - and a full fifth of Finland's energy needs were covered by net electricity imports in 2005. Two thirds of imports came from Russia, with imports reaching almost the maximum capacity of the countries' interconnectors

  12. Malaysia and the United States 2004-2005: The Best of Times

    Science.gov (United States)

    2005-02-01

    personal style stands in sharp contrast to that of his acerbic predecessor, Dr. Mahathir bin Mohamad. On a visit to the White House in July 2004, Prime...not as outspoken or as critical as his predecessor Datuk Seri Dr. Mahathir bin Mohamad, but also a reflection of the importance Kuala Lumpur places on...cancelled some of the hugely expensive mega projects that were the hallmark of the Mahathir era. One of the most important aspects of the election was the

  13. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  14. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  15. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries

  16. Results of monitoring at Olkiluoto in 2005. Foreign materials

    International Nuclear Information System (INIS)

    Vuorio, M.

    2006-08-01

    In this report the use of foreign materials in ONKALO is reviewed. The material handbook includes materials allowed for use in ONKALO as well as those that are forbidden. This monitoring report covers the foreign materials and the amounts used in ONKALO during 2005. During that time the access tunnel was excavated from chainage 155 m to chainage 990 m (a total 38231 m 3 of excavated rock). This report also summarises the total amount of materials used in ONKALO since the start of construction (2004-2005). (orig.)

  17. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  18. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  19. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  20. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  1. 76 FR 56167 - Marine Mammals; Pinniped Removal Authority

    Science.gov (United States)

    2011-09-12

    ... problem interactions. See http://www.nwr.noaa.gov/Marine-Mammals/Seals-and-Sea-Lions/Sec-120-Authority.cfm... to the pinniped predation problem at Bonneville Dam and is not a na[iuml]ve animal that can be driven... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA681 Marine...

  2. Measuring taste impairment in epidemiologic studies: the Beaver Dam Offspring Study.

    Science.gov (United States)

    Cruickshanks, K J; Schubert, C R; Snyder, D J; Bartoshuk, L M; Huang, G H; Klein, B E K; Klein, R; Nieto, F J; Pankow, J S; Tweed, T S; Krantz, E M; Moy, G S

    2009-07-01

    Taste or gustatory function may play an important role in determining diet and nutritional status and therefore indirectly impact health. Yet there have been few attempts to study the spectrum of taste function and dysfunction in human populations. Epidemiologic studies are needed to understand the impact of taste function and dysfunction on public health, to identify modifiable risk factors, and to develop and test strategies to prevent clinically significant dysfunction. However, measuring taste function in epidemiologic studies is challenging and requires repeatable, efficient methods that can measure change over time. Insights gained from translating laboratory-based methods to a population-based study, the Beaver Dam Offspring Study (BOSS) will be shared. In this study, a generalized labeled magnitude scale (gLMS) method was used to measure taste intensity of filter paper disks saturated with salt, sucrose, citric acid, quinine, or 6-n-propylthiouracil, and a gLMS measure of taste preferences was administered. In addition, a portable, inexpensive camera system to capture digital images of fungiform papillae and a masked grading system to measure the density of fungiform papillae were developed. Adult children of participants in the population-based Epidemiology of Hearing Loss Study in Beaver Dam, Wisconsin, are eligible for this ongoing study. The parents were residents of Beaver Dam and 43-84 years of age in 1987-1988; offspring ranged in age from 21-84 years in 2005-2008. Methods will be described in detail and preliminary results about the distributions of taste function in the BOSS cohort will be presented.

  3. Pay Inequities for Recently Hired Faculty, 1988-2004

    Science.gov (United States)

    Porter, Stephen R.; Toutkoushian, Robert K.; Moore, John V., III

    2008-01-01

    The national media and academic journals have reported a sizable wage gap between men and women in academe--a gap that has persisted over time. Data from the National Center for Education Statistics for 2004-2005 show that the average salary for all male faculty ($69,337) exceeded the average salary for female faculty ($56,926) by almost 22%.…

  4. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  5. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  6. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  7. Geotechnical Analysis Report for July 2004 - June 2005, Volume 2, Supporting Data

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-03-20

    This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2005. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).

  8. Geotechnical Analysis Report for July 2004 - June 2005, Volume 2, Supporting Data

    International Nuclear Information System (INIS)

    2006-01-01

    This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2005. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).

  9. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  10. Worldwide Emerging Environmental Issues Affecting the U.S. Military. April 2004 - April 2005

    Science.gov (United States)

    2005-04-01

    Reactors ( RERTR ) held in Vienna, November 8-11. [November 2004. Military Implications and Sources] Revival of Nuclear Power in Asia Poses Security...Military Implications: If not already done, the military should contact the RERTR Program managed by the Argonne National Laboratory of the U.S

  11. Niveles de plomo sanguíneo en recién nacidos de La Oroya, 2004-2005

    Directory of Open Access Journals (Sweden)

    Godofredo Pebe

    2008-10-01

    Full Text Available Objetivo. Determinar los niveles de plomo en sangre de los recién nacidos (RN de menos de 12 horas de vida, en la ciudad de La Oroya. Material y métodos. Estudio descriptivo, transversal y prospectivo realizado entre junio de 2004 a junio de 2005 de una muestra de recién nacidos (RN de La Oroya, se usó un cuestionario para la madre gestante y se determinó los niveles de plomo en sangre venosa (2 mL utilizando la espectrofotometría por absorción atómica con llama de aire de acetileno. Los valores se expresan en microgramos de plomo por decilitro de sangre (μg/dL. Resultados. Se evaluσ 93 RN; el nivel promedio de plomo en sangre fue de 8,84 ± 0,57 μg/dL. El 75,3% (70/ RN tuvo niveles de plomo en sangre entre 6 a 10 μg/dL, y 24,7% (23 RN tuvo mαs de 10 μg/dL. Los RN de madres que viven en La Oroya Nueva tienen menos niveles de plomo que los que viven en La Oroya Antigua (p=0,002. Conclusiones. Los RN de la ciudad de La Oroya presentan elevados niveles de plomo en sangre, por lo que se requiere iniciar programas de prevención en las madres gestantes para evitar futuros daños a la salud de los recién nacidos.

  12. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  13. Effect of beaver dams on the hydrology of small mountain streams: Example from the Chevral in the Ourthe Orientale basin, Ardennes, Belgium

    Science.gov (United States)

    Nyssen, J.; Pontzeele, J.; Billi, P.

    2011-05-01

    SummaryThe European beaver ( Castor fiber) was recently reintroduced to Belgium, after an absence of more than 150 years; around 120 beaver dam systems have been established. In Europe, few studies consider the hydrological effects of those dams, and the spatial scale larger than that of one beaver pond system has not been addressed at all. This research focuses on the hydrological effects of a series of six beaver dams on the Chevral R., a second order tributary of the Ourthe Orientale R. in a forested area of the Ardennes. Thereby, also the Ourthe Orientale sub-basin itself was taken into account, being the area with probably the highest density of beaver dams in Belgium. The main research questions regarded: (1) the extent to which discharge peaks are reduced at the very location and well downstream of beaver dams and (2) the impact of the beaver dams on low flows. The first approach consisted of a temporal analysis of the Ourthe Orientale discharge and precipitation data for the periods 1978-2003 (before) and 2004-2009 (after the establishment of beaver dams in the sub-basin). The second study determined the in situ impact of the beaver dams: discharges were measured (September 2009-March 2010) upstream as well as downstream of the 0.52 ha beaver dam system on the Chevral river, and changes in water level within the system of six dams were monitored. Our findings indicate that there is a significant lowering of discharge peaks in the downstream river reaches due to the effect of the beaver dams. The temporal analysis of the Ourthe Orientale sub-basin shows an increase in the recurrence interval for major floods; for instance, the recurrence interval of a reference flood of 60 m 3 s -1 increased from 3.4 years to 5.6 years since the establishment of the beaver dams. At the scale of the Chevral beaver dams' site, we measured that the dams top off the peak flows, in addition delaying them by approximately 1 day. There are also increased low flows: Q355 (i.e. the

  14. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  15. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  16. WIPP 2004 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2005-09-30

    The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States (U.S.). In 2004, 8,839 cubic meters (m3) of TRU waste were emplaced at WIPP. From the first receipt of waste in March 1999 through the end of 2004, 25,809 m3 of TRU waste had been emplaced at WIPP. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of WIPP environmental resources. DOE Order 450.1, Environmental Protection Program; DOE Order 231.1A, Environment, Safety, and Health Reporting; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2004 Site Environmental Report (SER) summarizes environmental data from 2004 that characterize environmental management performance and demonstrate compliance with applicable federal and state regulations. This report was prepared in accordance with DOE Order 231.1A, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2004 (DOE, 2005). The order and the guidance require that DOE facilities submit an annual SER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) further requires that the SER be provided to the New Mexico Environment Department (NMED).

  17. WIPP 2004 Site Environmental Report

    International Nuclear Information System (INIS)

    2005-01-01

    The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States (U.S.). In 2004, 8,839 cubic meters (m3) of TRU waste were emplaced at WIPP. From the first receipt of waste in March 1999 through the end of 2004, 25,809 m3 of TRU waste had been emplaced at WIPP. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of WIPP environmental resources. DOE Order 450.1, Environmental Protection Program; DOE Order 231.1A, Environment, Safety, and Health Reporting; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2004 Site Environmental Report (SER) summarizes environmental data from 2004 that characterize environmental management performance and demonstrate compliance with applicable federal and state regulations. This report was prepared in accordance with DOE Order 231.1A, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2004 (DOE, 2005). The order and the guidance require that DOE facilities submit an annual SER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) further requires that the SER be provided to the New Mexico Environment Department (NMED).

  18. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  19. The 2005 energy situation in France; Bilan energetique de l'annee 2005 en France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-04-15

    After a year 2004 of economic revival, 2005 shows a crisis of the energy prices and a slow economic activity. The year is characterized by again a petroleum consumption decrease, a poor hydro electric power which generates an increase of the fossil fuels consumption and finally a little increase of the primary energy consumption and CO{sub 2} emissions. It provides more details on the economic and energy context, on the energy consumption and production and on the carbon dioxide emissions from the energy. (A.L.B.)

  20. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  1. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  2. First quarter 2005 sales data; Chiffre d'affaires du 1. trimestre 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-04-15

    This press release brings information on the AREVA group sales data. First quarter 2005 sales for the group were 2,496 millions of euros, up 3,6% year-on-year from 2,41 millions. The change in foreign exchange rates between the two periods show a negative impact of 22 millions euros, which is much lower than in the first quarter of 2004. It analyzes also in more details the situation of the front end, the reactors and service division, the back end division, the transmission and distribution division and the connectors division. (A.L.B.)

  3. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  4. Social norms for population displacements caused by large dams France, 20th century

    Directory of Open Access Journals (Sweden)

    Armelle Faure

    2009-03-01

    Full Text Available With the passage of time and insights from a number of historical studies it is now possible to take a look back at the way rural populations in France were displaced for the construction of large dams during and after the Second World War. Today, international standards relating to the social implications of dam development projects are imposed on dam builders by both governments and financing institutions. However, in the absence of these international social standards, how did population displacements take place in the past? This paper provides a retrospective look in the light of the current "protection policies" developed by the World Bank and the Asian Development Bank. Retrospective case studies are based on research conducted in the Alps by Virginie Bodon on Tignes and Serre-Ponçon for her doctoral thesis in history (1999 and on the book by D. Varaschin on Tignes. The author uses her own studies on the impact of the large dams of the Upper Dordogne, based on research conducted in departmental and municipal archives and on interviews with those who witnessed the implementation of displacement policies and with their children (1998-2005. The author draws on her experience as an anthropologist for the World Bank to analyse the ways in which these displacements were actually carried out. The forced displacements, euphemistically referred to as "involuntary resettlement" in discourses on development, took on increasing notoriety with the international energy crisis. The dams gave rise to an international debate on their social and environmental impacts, a debate continued by the World Commission on Dams. Today, when financing has again become available for the construction of new dams throughout the world, it seems opportune to provide some insights into the social implications of large dam development projects based on the experience of France, a country that has been, in many respects, one of the most innovative in the implementation of

  5. Performance of a surface bypass structure to enhance juvenile steelhead passage and survival at Lower Granite Dam, Washington

    Science.gov (United States)

    Adams, Noah S.; Plumb, John M.; Perry, Russell W.; Rondorf, Dennis W.

    2014-01-01

    An integral part of efforts to recover stocks of Pacific salmon Oncorhynchus spp. and steelhead O. mykiss in Pacific Northwest rivers is to increase passage efficacy and survival of juveniles past hydroelectric dams. As part of this effort, we evaluated the efficacy of a prototype surface bypass structure, the removable spillway weir (RSW), installed in a spillbay at Lower Granite Dam, Washington, on the Snake River during 2002, 2003, 2005, and 2006. Radio-tagged juvenile steelhead were released upstream from the dam and their route of passage through the turbines, juvenile bypass, spillway, or RSW was recorded. The RSW was operated in an on-or-off condition and passed 3–13% of the total discharge at the dam when it was on. Poisson rate models were fit to the passage counts of hatchery- and natural-origin juvenile steelhead to predict the probability of fish passing the dam. Main-effect predictor variables were RSW operation, diel period, day of the year, proportion of flow passed by the spillway, and total discharge at the dam. The combined fish passage through the RSW and spillway was 55–85% during the day and 37–61% during the night. The proportion of steelhead passing through nonturbine routes was 95% when the RSW was on during the day. The ratio of the proportion of steelhead passed to the proportion of water passing the RSW was from 6.3:1 to 10.0:1 during the day and from 2.7:1 to 5.2:1 during the night. Steelhead passing through the RSW exited the tailrace about 15 min faster than fish passing through the spillway. Mark–recapture single-release survival estimates for steelhead passing the RSW ranged from 0.95 to 1.00. The RSW appeared to be an effective bypass structure compared with other routes of fish passage at the dam.

  6. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  7. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  8. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  9. Standing Concertation Committee - Ordinary Meeting on 15 January 2005

    CERN Multimedia

    2005-01-01

    This meeting was devoted to the main topics summarised below. Follow-up from the meetings of the Finance Committee and Council in December 2004 The Chairman welcomed two new SCC members representing the Staff Association: Véronique Paris and Gianni Deroma. Expressing their best wishes for the New Year, the members of the SCC took note of a report by the Chairman on the outcome of these Committee meetings and of the Director-General's staff meeting on 10 January 2005, and discussed a number of internal follow-up actions. Work planning of the SCC & TREF The SCC agreed its calendar of ordinary sessions and its draft work planning for the first half of 2005, subject to including a number of matters outstanding from 2004. The Committee discussed internal preparation for the next meeting of TREF on 4 & 5 April devoted to items concerning the current 5-Yearly Review. The SCC also took note of the provisional scheduling of TREF meetings from May to September, which will be settled by...

  10. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  11. Analysis the dynamic response of earth dam in free vibration and forced by introducing the effect of the interaction dam foundation

    Directory of Open Access Journals (Sweden)

    Malika Boumaiza

    2018-01-01

    Full Text Available The present study concerns the analysis of the dynamic response of earth dam, in free and forced vibration (under the effect of earthquake using the finite element method. The analysis is carried out at the end of dam construction without filling. The behavior of the dam materials and the foundation is linear elastic. In free vibration, to better understand the effect of the dam foundation interaction, we will take into account different site conditions and see their influence on the free vibration characteristics of the dam. In forced vibration, to study the seismic response of the dam, the system is subjected to the acceleration of the Boumerdes earthquake of May 21, 2003 recorded at the station n ° 2 of the dam of Kaddara in the base, with a parametric study taking into account the influence of the main parameters such as the mechanical properties of the soil: rigidity, density.

  12. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  13. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites

  14. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  15. Map showing Features and Displacements of the Scenic Drive Landslide, La Honda, California, During the Period March 31, 2005-November 5, 2006

    Science.gov (United States)

    Wells, Ray E.; Rymer, Michael J.; Prentice, Carol S.; Wheeler, Karen L.

    2006-01-01

    The Scenic Drive landslide in La Honda, San Mateo County, California began movement during the El Ni?o winter of 1997-98. Recurrent motion occurred during the mild El Ni?o winter of 2004-2005 and again during the winter of 2005-06. This report documents the changing geometry and motion of the Scenic Drive landslide in 2005-2006, and it documents changes and persistent features that we interpret to reflect underlying structural control of the landslide. We have also compared the displacement history to near-real time rainfall history at a continuously recording gauge for the period October 2004-November 2006.

  16. VUEZ. Annual report 2005

    International Nuclear Information System (INIS)

    2006-01-01

    A brief account of activities carried out by the Vyskumny ustav energetickych zariadeni, a.s. (VUEZ) in 2005 is presented. These activities are reported under the headings: (1) Introductory address by the Chairman of the Board of Directors; (2) On the company; (3) Basic data; (4) Product portfolio and customer services; (5) Quality management system; (6) Human resources; (7) Economic data; (7) Adving, s.r.o.; (8) Basic data and company management; (9) Line of business; (10) Activities performed in the past year; (11) Economic data; (12) Contact persons and addresses. In 2005, a number of important events took place in VUEZ. On the home market, our main business partner was SE a.s. Company. The key works were performed at SE nuclear power plant sites in Jaslovske Bohunice and Mochovce. A considerable volume of works co-ordinated by our company was executed also for Vodohospodarska vystavba Bratislava at the Gabcikovo Dam. On the foreign market, VUEZ kept on carrying out ongoing projects of preparation for the Jaslovske Bohunice V1 NPP decommissioning in co-operation with a consortium of foreign companies. In the field of experimental research, another project was launched in co-operation with IRSN Paris. As to leak tightness improvement of hermetic compartments and integrated leakage rate tests in nuclear power plants, works were continued in foreign plants such as the Dukovany NPP, Czech Republic, and the Paks NPP, Hungary

  17. Kumutekitav arhitektuuriaasta 2005 = The Kumu-lative year in architecture 2005 / Liina Jänes, Karin Paulus

    Index Scriptorium Estoniae

    Jänes, Liina, 1977-

    2006-01-01

    Eesti Kultuurkapitali aastapreemia 2005 - Kumu Kunstimuuseum, arhitekt Pekka Vapaavuori. Objektipreemia - büroohoone City Plaza - Alver Trummal Arhitektid (Andres Alver, Tiit Trummal, Martin Melioranski, Indrek Rünkla). Arhitektuuri ja sisekujunduse parima terviku preemia - Jõelähtme golfiklubi, arhitekt Andres Siim, sisearhitekt Juta Lember. Tegevuaspreemia - Teddy Böckler, Tallinna raekoja pikaajalise uurimis- ja restaureerimistöö, raamatu "Tallinna raekoda : uurimine ja restaureerimine 1952-2004" eest. Teadustöö preemia - Karin Hallas-Murula, kahe eesti-soome teemalise arhitektuuriuurimuse eest: "Suurlinn Tallinn: Eliel Saarineni "Suur-Tallinna" projekt, 1913" ja "Soome-Eesti - sajand arhitektuurisuhteid"

  18. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  19. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  20. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  1. Lake Roosevelt White Sturgeon Recovery Project : Annual Progress Report, January 2003 – March 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Howell, Matthew D.; McLellan, Jason G. [Washington Department of Fish and Wildlife

    2009-07-15

    This report summarizes catch data collected from white sturgeon Acipenser transmontanus in Lake Roosevelt during limited setlining and gill netting activities in the fall of 2003, and documents progress toward development of a U.S. white sturgeon conservation aquaculture program for Lake Roosevelt. From 27-30 October, 42 overnight small mesh gill net sets were made between Marcus and Northport, WA for a total catch of 15 juvenile white sturgeon (275-488 mm FL). All sturgeon captured were of Canadian hatchery origin. These fish had been previously released as sub-yearlings into the Canadian portion (Keenleyside Reach) of the Transboundary Reach of the Columbia River during 2002 and 2003. Most sturgeon (n=14) were caught in the most upstream area sampled (Northport) in low velocity eddy areas. Five fish exhibited pectoral fin deformities (curled or stunted). Growth rates were less than for juvenile sturgeon captured in the Keenleyside Reach but condition factor was similar. Condition factor was also similar to that observed in juvenile sturgeon (ages 1-8) captured in the unimpounded Columbia River below Bonneville Dam between 1987-92. From 10-14 November, 28 overnight setline sets were made in the Roosevelt Reach between the confluence of the Spokane River and Marcus Island for a total catch of 17 white sturgeon (94-213 cm FL). Catch was greatest in the most upstream areas sampled, a distribution similar to that observed during a WDFW setline survey in Lake Roosevelt in 1998. The mean W{sub r} index of 110% for fish captured this year was higher than the mean W{sub r} of 91% for fish captured in 1998. Excellent fish condition hindered surgical examination of gonads as lipid deposits made the ventral body wall very thick and difficult to penetrate with available otoscope specula. Acoustic tags (Vemco model V16 coded pingers, 69 kHz, 48-month life expectancy) were internally applied to 15 fish for subsequent telemetry investigations of seasonal and reproductively

  2. Stratus Ocean Reference Station (20 deg. S, 85 deg. W) : Mooring Recovery and Deployment Cruise, R/V Ronald H. Brown Cruise 05-05, September 26, 2005-October 21, 2005

    National Research Council Canada - National Science Library

    Hutto, Lara; Weller, Robert; Lord, Jeff; Smith, Jason; Bouchard, Paul; Fairall, Chris; Pezoa, Sergio; Bariteau, Ludovic; Lundquist, Jessica; Ghate, Virendra

    2006-01-01

    .... During the October 2005 cruise of NOAA's R/V Ronald H. Brown to the ORS Stratus site, the primary activities were recovery of the WHOl surface mooring that had been deployed in December 2004, deployment of a new...

  3. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities

    International Nuclear Information System (INIS)

    Hawkes, L.A.; Martinson, R.D.; Absolon, R.F.

    1993-05-01

    The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relative run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC's Fish Passage Data System (FPDS)

  4. Effects of Chiloquin Dam on spawning distribution and larval emigration of Lost River, shortnose, and Klamath largescale suckers in the Williamson and Sprague Rivers, Oregon

    Science.gov (United States)

    Martin, Barbara A.; Hewitt, David A.; Ellsworth, Craig M.

    2013-01-01

    Chiloquin Dam was constructed in 1914 on the Sprague River near the town of Chiloquin, Oregon. The dam was identified as a barrier that potentially inhibited or prevented the upstream spawning migrations and other movements of endangered Lost River (Deltistes luxatusChasmistes brevirostris) suckers, as well as other fish species. In 2002, the Bureau of Reclamation led a working group that examined several alternatives to improve fish passage at Chiloquin Dam. Ultimately it was decided that dam removal was the best alternative and the dam was removed in the summer of 2008. The U.S. Geological Survey conducted a long-term study on the spawning ecology of Lost River, shortnose, and Klamath largescale suckers (Catostomus snyderi) in the Sprague and lower Williamson Rivers from 2004 to 2010. The objective of this study was to evaluate shifts in spawning distribution following the removal of Chiloquin Dam. Radio telemetry was used in conjunction with larval production data and detections of fish tagged with passive integrated transponders (PIT tags) to evaluate whether dam removal resulted in increased utilization of spawning habitat farther upstream in the Sprague River. Increased densities of drifting larvae were observed at a site in the lower Williamson River after the dam was removed, but no substantial changes occurred upstream of the former dam site. Adult spawning migrations primarily were influenced by water temperature and did not change with the removal of the dam. Emigration of larvae consistently occurred about 3-4 weeks after adults migrated into a section of river. Detections of PIT-tagged fish showed increases in the numbers of all three suckers that migrated upstream of the dam site following removal, but the increases for Lost River and shortnose suckers were relatively small compared to the total number of fish that made a spawning migration in a given season. Increases for Klamath largescale suckers were more substantial. Post-dam removal monitoring

  5. Trends in energy 2005. Utility value chain optimisation

    International Nuclear Information System (INIS)

    Fens, T.; IJsbrandy, C.; Van Druten, A.; De Rooij, S.; Van de Rhee, R.; Rookmaaker, J.; Spaans, P.; Pulles, L.

    2005-01-01

    Trends in Energy 2005 has been written around a number of events that were observed in research that was carried out in 2004: the full market opening mid 2004, the likely unbundling of distribution networks in some form, security of supply issues, fuel mix in the generation portfolio and the associated investment strategies, the rise of intelligent metering, certificates of origin for electricity, the most likely movement towards the suppliers model ('leveranciersmodel') and finally emissions management emerging from Kyoto that is coming into force. These events have been interpreted from the perspective of the units in the energy value chain: production, trade, transmission, distribution, metering and sales, the latter is the mostly the direct contact for the end customer

  6. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  7. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  8. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  9. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  10. Utilization of the fish ladder at the Engenheiro Sergio Motta Dam, Brazil, by long distance migrating potamodromous species

    Directory of Open Access Journals (Sweden)

    Sérgio Makrakis

    Full Text Available Utilization of the fish ladder installed at the Engenheiro Sergio Motta Dam (also known as Porto Primavera on the Paraná River, Southern Brazil, by long-distance migrating potamodromous species (sampling Protocol I, and ascending and descending movements (Protocol II were evaluated. Three pools along the fish ladder (designated as lower, middle, and upper were sampled monthly between December, 2004 and March, 2005 to determine the abundance of species in the ladder. The ascending and descending movements of the species in the ladder were also analyzed in the same period. In the samples for both protocols, 37 species representing 17 families and 5 orders (Characiformes, Siluriformes, Perciformes, Gymnotiformes, and Myliobatiformes were recorded. Characiformes were represented by 21 species. Long- distance migratory species (11 species predominated in the ladder (60% of the total number of individuals, with high abundance of Rhinelepis aspera (5645 individuals. For protocol I, mean abundance varied greatly among the months and pools, with lowest values in December and March for all pools, and highest in January for the lower pool due to high capture of R. aspera. Fish abundance declined from the lower to the upper pool, especially for R. aspera and Rhaphiodon vulpinus. For Protocol II, 17 species were recorded ascending the ladder, where Astyanax altiparanae and Leporinus friderici were the most abundant species (684 and 111 individuals, respectively. However, 18 species showed descending movements, with high captures of Metynnis maculatus and A. altiparanae (339 and 319 individuals, respectively. Twelve species (52% moved in both directions, and among the seven migratory species sampled, four were recorded ascending and descending, and three species only ascending the ladder. The fish ladder appears to selectively favor species with high swimming capabilities. A discussion is presented on the requirements for future research on attraction to the

  11. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  12. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  13. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  14. Geologic map of the Cochiti Dam quadrangle, Sandoval County, New Mexico

    Science.gov (United States)

    Dethier, David P.; Thompson, Ren A.; Hudson, Mark R.; Minor, Scott A.; Sawyer, David A.

    2011-01-01

    The Cochiti Dam quadrangle is located in the southern part of the Española Basin and contains sedimentary and volcanic deposits that record alluvial, colluvial, eolian, tectonic and volcanic processes over the past seventeen million years. The geology was mapped from 1997 to 1999 and modified in 2004 to 2008. The primary mapping responsibilities were as follows: Dethier mapped the surficial deposits, basin-fill sedimentary deposits, Miocene to Quaternary volcanic deposits of the Jemez volcanic field, and a preliminary version of fault distribution. Thompson and Hudson mapped the Pliocene and Quaternary volcanic deposits of the Cerros del Rio volcanic field. Thompson, Minor, and Hudson mapped surface exposures of faults and Hudson conducted paleomagnetic studies for stratigraphic correlations. Thompson prepared the digital compilation of the geologic map.

  15. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  16. Measuring energy conservation on Nova Scotia (NS) farms: A 2004 to 2011 comparison

    International Nuclear Information System (INIS)

    Bailey, J.A.; Duinker, P.; Amyotte, P.; Adams, M.; Khan, F.

    2016-01-01

    Many jurisdictions, including Nova Scotia (NS), have implemented policies and programs around energy. The NS government has targeted energy efficiency and more renewable energy as two main policy areas. The NS Department of Agriculture has taken initiative to provide support to implement energy conservation, energy efficiency and renewable energy opportunities in recent years but have these programs and policies been effective? A baseline energy use survey was conducted in 2005 and responses from mail surveys in 2012 (n = 273, 11.4% response rate) were used to measure the change in NS farm energy use data reported for 2004 and 2011. There have been significant reductions in energy use on NS farms. On average, NS farmers spent $8790 on energy expenses in 2011 compared to $11,228 in 2004. Adjusting for inflation, this is a 32% decrease, despite energy commodity pricing increases beyond the inflation rate. This is likely due to a decrease in energy use and a shift from gasoline use to diesel use. By the end of 2012, 36.0% of NS farmers (more than 860) had received some level of support to evaluate their energy options. This includes 410 energy audits compared to only 36 by the end of 2005. - Highlights: • Nova Scotia farmers decreased their energy costs by 32% between 2004 and 2011. • Energy reductions were likely due to decreased energy use and a shift in fuel use. • An estimated 374 NS farms had an energy audit between 2005 and 2012.

  17. Üldine kaubandus (toidukaupade turg) : toidukaupade väliskaubanduse bilanss [2003-2004] / Õrne Pill, Liia Laanes, Ene Maadvere

    Index Scriptorium Estoniae

    Pill, Õrne

    2005-01-01

    Ilmunud ka: Agriculture and the development of rural life : overview 2004/2005. - Tallinn, 2005, lk. 55-65. Põllumajandussaaduste ekspordimaht kasvas eelmise aasta sama perioodiga võrreldes 5,1% ning impordimaht vähenes 1,8%, kaubandusbilansi negatiivne saldo moodustas 4507,7 mln krooni. Diagrammid

  18. Characterization of the Kootenai River Algae Community and Primary Productivity Before and After Experimental Nutrient Addition, 2004–2007 [Chapter 2, Kootenai River Algal Community Characterization, 2009 KTOI REPORT].

    Energy Technology Data Exchange (ETDEWEB)

    Holderman, Charlie [Kootenai Tribe of Idaho; Bonners Ferry, ID; Anders, Paul [Cramer Fish Sciences; Moscow, ID; Shafii, Bahman [Statistical Consulting Services; Clarkston, WA

    2009-07-01

    The Kootenai River ecosystem (spelled Kootenay in Canada) has experienced numerous ecological changes since the early 1900s. Some of the largest impacts to habitat, biological communities, and ecological function resulted from levee construction along the 120 km of river upstream from Kootenay Lake, completed by the 1950s, and the construction and operation of Libby Dam on the river near Libby Montana, completed in 1972. Levee construction isolated tens of thousands of hectares of historic functioning floodplain habitat from the river channel downstream in Idaho and British Columbia (B.C.) severely reducing natural biological productivity and habitat diversity crucial to large river-floodplain ecosystem function. Libby Dam greatly reduces sediment and nutrient transport to downstream river reaches, and dam operations cause large changes in the timing, duration, and magnitude of river flows. These and other changes have contributed to the ecological collapse of the post-development Kootenai River ecosystem and its native biological communities. In response to large scale loss of nutrients, experimental nutrient addition was initiated in the North Arm of Kootenay Lake in 1992, in the South Arm of Kootenay Lake in 2004, and in the Kootenai River at the Idaho-Montana border during 2005. This report characterizes baseline chlorophyll concentration and accrual (primary productivity) rates and diatom and algal community composition and ecological metrics in the Kootenai River for four years, one (2004) before, and three (2005 through 2007) after nutrient addition. The study area encompassed a 325 km river reach from the upper Kootenay River at Wardner, B.C. (river kilometer (rkm) 445) downstream through Montana and Idaho to Kootenay Lake in B.C. (rkm 120). Sampling reaches included an unimpounded reach furthest upstream and four reaches downstream from Libby Dam affected by impoundment: two in the canyon reach (one with and one without nutrient addition), a braided reach

  19. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  20. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6