WorldWideScience

Sample records for bolivia-brazil gas pipeline

  1. Environmental management programs of the Bolivia-Brazil gas pipeline; Programa de gestao ambiental do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Helio Joaquim dos [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    One of the largest South America's enterprises of energy integration of the Bolivia/Brazil gas pipeline in Brazilian side own and operated by TBG has interacted with 05 states, 137 districts and 06 environment governmental entities (IBAMA and States' department) of environment multilateral financial institutions and group of ten of other governmental and not governmental organizations. The level of approved investment was of the order of 1,5 billion dollars, of which about 29 million had been destined the ambient activities. Thus, without precedents in Brazil this work presents the plan of ambient management of the enterprise, created to develop and implement the ambient programs during the construction and operation of the gas pipeline stage. The work here presented will give prominence to the programs of ambient compensation and social communication inside Brazil. (author)

  2. Internal lining of the Bolivia-Brazil gas pipeline: a PETROBRAS experience

    Energy Technology Data Exchange (ETDEWEB)

    Taves, J.M.D.V.; Sanandres, S.R.; Quintela, J.P. [PETROBRAS (Brazil); Ferreira, S.R.; Fazanaro, A.G. [CONBAF (Brazil)

    1999-07-01

    For the first time in Brazil a large gas pipeline, compared to the largest ones existing in other continents, was designed and built. Reaching for gas transportation high efficiency, an internal coating was applied to obtain a smooth and uniform surface and to reduce the flow friction. The pipe roughness values, with and without coating, considered on technical and economical studies, which determined the application of 5,400,000 m{sup 2} of a 60 {mu}m thick epoxy film inside the pipes must be confirmed. By the time that the original specification had to be modified during application, special care needed to be taken during the gas line construction in order to preserve coating quality until operation starts. (author)

  3. Case history: recovery of the Bolivia-Brazil natural gas pipeline at the Vocoroca reservoir crossing Parana state; Caso historico: recuperacao da travessia do gasoduto Bolivia-Brazil no reservatorio da barragem de Vocoroca-Parana

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Hudson Regis; Vasconcellos, Carlos Renato Aragonez de [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The Bolivia-Brazil Natural Gas Pipeline - GASBOL - begins in the city of Santa Cruz of La Sierra, in Bolivia, arriving in Canoas (RS), in Brazil, traveling an extension of 3.150 Km. Of this total, 2.593 Km are in Brazilian soil. In the kilometer 526+500m of the south spread, GASBOL crosses the reservoir of the Vocoroca's dam (COPEL), which had its operational level reduced, in face of the station of the droughts that usually reaches the area in the months of March to September. The lowing of the reservoir caused the turn of the course of Fojo River (Sao Joaozinho River) to its natural quota, forming a waterfall, whose hydraulic gradient caused the removal of the sediment and part of the foundation soil, discovering the pipe that was with space free from approximately 13 m of length. This paper discusses the solution adopted, as well as the several details of the recovery project, besides geotechnical and hydraulic studies and the aspects of safety of the Gas Pipeline. (author)

  4. A historical case in the Bolivia-Brazil natural gas pipeline: slope on the Curriola River; Caso historico no Gasoduto Bolivia-Brasil: encosta no Rio Curriola

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Hudson Regis; Vasconcellos, Carlos Renato Aragonez de [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The Bolivia-Brazil Natural Gas Pipeline has 2.593 kilometers since Rio Grande City in Bolivia until Canoas City, in south Brazil. The pipeline crosses a lot of types of geological fields and difficult topography. The south spread of the gas pipeline is the most interesting because of its hard topography combined with the variety of geological materials, such as, colluvium deposits and debris flow areas. Curriola River is located at the kilometer 408, north part of Parana State. In this area, the pipeline crosses slopes of 45 degrees of inclination. The down part of Curriola's slope is composed by a non-resistance material (clay and little rock blocks) with a high porosity. Every year, during the rainy seasons, tension cracks are observed evidencing the earth movement. The slope stability is above the minimum expected for pipeline operation. The aim of this paper is to present the site characterization of the Curriola River Slope, together with all the investigation made in order to supply the studies with condensed information for the slope stabilization. (author)

  5. A historical case in the Bolivia-Brazil Natural Gas Pipeline: five years of stress monitoring at the Curriola river slope

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Joao Carlos de [Transportadora Brasileira Gasoduto Bolivia-Brasil S.A., Rio de Janeiro, RJ (Brazil); Goncalves Junior, Armando Albertazzi; Viotti, Matias Roberto [Universidade Federal de Santa Catarina (UFSC), Florianopolis, SC (Brazil)

    2009-07-01

    The Bolivia-Brazil Natural Gas Pipeline is approximately 3,500 kilometers long since the city of Rio Grande, in Bolivia, until the city of Canoas, in the South of Brazil. The south spread of the pipeline - approximately 850 kilometers long - is characterized by a steep topography combined with a variety of geological sites, such as colluviums deposits and debris flow areas. Within such a scenario, a spot nearby Curriola River, as can be seen in Figure 1.a, it shows hillsides with slopes of almost 40 degrees of inclination. Every year, mainly along the rainy season, mass movements tend to overburden the pipeline, jeopardizing its integrity. Because of this, geotechnical works have been done and, since 2004 up to 2008, mechanical stress surveys were applied. This paper aims to summarize all mechanical investigations made, including residual stresses assessment, the variation of the state of mechanical stresses along those years, methodology and full interpretation of the data acquired. From this gross data, internal pressure loading and residual stresses have been discounted from the combined stresses assessed, so as to indicate only the ground interaction and main direction of the corresponding loading. All this together with geotechnical models is intended to support mitigation measures for global stress relieving and preserving the pipeline's integrity. (author)

  6. Efficiency analysis on the use of internal lining in the Bolivia-Brazil gas pipeline; Analise da eficiencia do uso de revestimento interno na tubulacao do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Silva, Marcos Jose Moraes da [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Bittencourt, Maria Angelica Santos; Coelho Junior, Robson Teixeira [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The internal lining in gas pipelines aims the reduction of roughness and, consequently, the friction factor, therefore resulting in a reduction of pressure drop in natural gas flowing. During Bolivia-Brazil gas pipeline basic design, the cost benefit of internal coating was analyzed, in terms of friction factor reduction and distances between Compressor Stations. It was observed an increase of transport capacity and reduction of compressors' power, thus leading to its utilization. Since the pipeline is already in operation, using a SCADA system with Advanced Functions, a comparison between the current real friction factor in the pipeline with that theoretical values used during the design phase becomes possible. Through this comparison, it is possible to evaluate internal coating's efficiency, quantifying its real benefit for gas pipelines. (author)

  7. Remote monitoring of cathodic protection rectifiers of the Bolivia-Brazil Gas Pipeline using low orbit satellite telephone; Monitoracao remota de retificadores de protecao catodica do Gasoduto Bolivia-Brasil utilizando telefone via satelite de baixa orbita

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Jorge Fernando Pereira [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The present paper has for objective to present the information collected during definitions, development, implementation, testing and operation phases of the Pilot System for monitoring of the Cathodic Protection Rectifiers MS-10 and SP-09, installed on the Bolivia-Brazil Gas Pipeline. The adopted solution for the Pilot System includes, basically, communication through low-earth satellite telephone, inter linked to the public telephone net, acquisition and data transmission system (Remote Terminal Unit) and data reception in the Supervision and Control Room. (author)

  8. Design and stabilization works of the km 767 slope of Bolivia-Brazil gas pipeline; Projeto e obra de estabilizacao do talude do km 767 do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Hudson R.; Vasconcellos, Carlos Renato Aragonez de [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The Bolivia-Brazil Natural Gas Pipeline starts at Santa Cruz de La Sierra city, in Bolivia, and goes until Canoas City (RS) in Brazil, with a total extent of 3,150 km. The pipeline crosses in the 2,593 km established in Brazilian soil, the most diverse types of geology and geomorphology. Along the line, the right-of-way (ROW) also crosses a lot of roads, railways, rivers and lakes. During a routine inspection (foot patrol), signs of instability were detected at an embankment slope of a highway of the Santa Catarina state, at the pipeline crossing. An eventual failure of this slope could put the pipeline at risk. The aim of this paper is to present the aspects of the stabilizations phases, since field investigation, design, works, instrumentation, until monitoring. Emphasis is given to the design criteria to pipeline safety. The solution adopted is composite by soil nailing, a changing of slope inclination and superficial drainage system. (author)

  9. Bolivia-Brazil gas pipeline: a study on the economic viability; Gasoduto Bolivia-Brasil: um estudo sobre a viabilidade economica

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Fabiano Ionta Andrade; Almeida, Isaque da Silva [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil); Guerra, Sinclair Mallet Guy [Universidade de Sao Paulo (USP), SP (Brazil)

    2008-07-01

    In the year of 2003 the Brazilian government, as form of to stimulate the demand for natural gas in the country and to promote the success of the investment accomplished in the construction of the pipe line Bolivia-Brazil, it lowered the price of the Bolivian commodity' in US$0,85/MMBTU. In the end of 2005 and mainly in 2006, the current Bolivian president Evo Morales nationalized the energy reservations of your country. To main change it is related to the price of sale of the Bolivian input. The values stipulated in contract they were broken and new negotiations are in process. The maximum capacity of transport of natural gas was reached in 2007. However, before the crisis established due to the measure taken by the government from Bolivia, Brazil suspended the investments in compressors and the projections of increase of this capacity were stagnated. One of the forecasts was to increase in at least more 50% of the current capacity or even in 100% in a more promising scenery. Before this context this research makes the analysis of economical viability regarding the construction of the pipe line Bolivia-Brazil in agreement with three sceneries. The first of them suggests that the investments foreseen in compressors it was stopped and, this way, the pipe line will operate it ties the end of the amortization with your current maximum capacity. The second scenery already suggests that the investments were not interrupted, in other words, the current maximum capacity was overcome in 50%. Similarly to the previous ones, the third scenery makes reference the overrun of the current capacity in 100%. The methodology used for such an analysis it was lent of the financial mathematics and it is treated of the calculation of TIR and of VPL. Both studies show that in agreement with TIR (15%) and VPL the economical viability is satisfactory. The president of PETROBRAS is renegotiating the contract and the investments will probably be retaken. This measured it seeks to

  10. Network transportation model with capacity restrictions for the Bolivia Brazil gas pipeline influence area; Modelo de transporte em rede com restricoes de capacidade para a area de influencia do Gasoduto Bolivia Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Patricia Mannarino; Carpio, Lucio Guido Tapia [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Programa de Planejamento Energetico

    2004-07-01

    We present the application of a network transportation model, with capacity restrictions, to determine the minimal cost of supply of a group of markets at the Bolivia Brazil Gas Pipeline influence area, as a function of city gate price. We consider the potential of integration of pipeline transportation at the South Cone, looking forward to supply the Brazilian market. The city gate price consists of the sum of commodity price plus transportation tariffs over every gas pipeline through which the gas passes (except distribution pipelines). There is no distinction related to product quality (e.g. heating value) among suppliers, or among end uses (thermal, thermoelectric or chemical). The model is numerically solved by linear programming. Flow direction alternatives and transportation tariffs alternatives (postal and by zone) are proposed. The model allows, among other applications: identification of the lowest cost supply strategy, identification of network flow capacity bottlenecks, determination of operation and expansion marginal costs using dual solution analysis, investigation of alternative sceneries through sensibility analysis and appreciation of non-optimal solutions that might be attractive. (author)

  11. Analysis of the changes in the consumption profile of the system use gas in Bolivia-Brazil Gas Pipeline after integration with the Campinas-Rio Gas Pipeline; Analise das alteracoes do perfil de consumo de gas de sistema no Gasoduto Bolivia-Brasil apos a interligacao deste gasoduto com o Campinas-Rio

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Almir Beserra dos; Bisaggio, Helio da Cunha; Veloso, Luciano de Gusmao [Agencia Nacional do Petroleo, Gas Natural e Biocombustiveis (ANP), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The natural gas pipeline transport is carried out by one or more compression stations. Each station possesses one or more compressors. The compressor's fuel is usually natural gas itself. The amount of natural gas consumed by the compressors fluctuates daily according to the demand at the city-gates. The daily operational result of a pipeline is known as imbalance. The imbalance is the difference between the natural gas entering into a in a pipeline and the volume delivered in the city-gates added to system use gas. The imbalance analyses in a pipeline that uses natural gas powered compressors requires the analyses of the system use gas. The aim of this work is to study the system use gas in the Bolivia-Brazil pipeline using the available data from the Superintendencia de Comercializacao e Movimentacao de Petroleo, seus Derivados e Gas Natural - ANP and compare the change of the volume consumed before and after the entry into operation of the Campinas-Rio gas pipeline. (author)

  12. Elaboration of sustainable capacity maps of Bolivia-Brazil pipeline; Elaboracao de cartas de capacidade sustentavel na area de influencia do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Hernandes, Gilberto L.S. [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Daitx, Elias C.; Rueda, Jairo J.R.; Caetano, Norton R. [UNESP, Rio Claro, SP (Brazil). Inst. de Geociencias e Ciencias Exatas; Mattos, Juercio T. de [UNESP, Bauru, SP (Brazil). Faculdade de Arquitetura, Artes e Comunicacao

    2005-07-01

    The analysis of drainage net allows to identify features of relief symmetry and/or not symmetry and know its morpho structure (high and low structural). The interpretation of relief and drainage texture elements at Landsat/ETM7+ satellite images allows to identify the geo environmental zoning. The integration between morpho structural maps and geo environmental zones maps produces sustainable capacity maps. In the Bolivia-Brazil Gas Pipeline influence area, the evaluation of sustainable capacity shapes the interrelation among gas pipeline and physical environment and allows classify more geological and geotechnical favorable areas to gas pipeline maintenance. Gas pipeline regions located at 'High Sustainable Capacity' need few maintenance. However, gas pipeline regions at 'Low/Very Low Sustainable Capacity' need constant investment and monitoring. (author)

  13. Metrological control of the gas flow and analysis of mass conservation in Bolivia-Brasil gas pipeline; Controle metrologico da vazao de gas e analise da conservacao de massa no gasoduto Bolivia-Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Palhares, Julio Cesar [TBG - Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Orlando, Alcir de Faro; Frota, Mauricio Nogueira [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Curso de Pos-graduacao em Metrologia para Qualidade Industrial

    2005-07-01

    International gas pipelines reflect a integrated commerce and impose a metrological challenge for the custody transferences that indistinctly imply in significant economic impact. This work argues the complex analysis of the mass balance and expression of uncertainties of the Gasoduto Bolivia-Brasil (3.150 Km of length, 557 Km in Bolivian territory and 2.593 Km that cross Brazil of West for East), today carrying approximately 60% from its maximum capacity (30 million of cubic meters daily), operating for the Transportadora Brasileira Gasoduto Bolivia Brasil S.A., a enterprise controlled by PETROBRAS Gas S/A (GASPETRO). The TBG measuring methods always taking care of the necessities of the customers as well as being lined up with the changes of the natural gas market. In six years of existence, the TBG came along with the legislation created for regulating agency in formation and adjusted to the establishment of the contract inspector, important landmarks of the evolution of the market. This work presents the definitions that guide the metrological subjects of the TBG, making use of efficient tools in answers for each demand and searching to satisfy its proper necessities, the necessities of its customers and the new demands of the regulating agency. (author)

  14. Improvement activities to soil stabilization near Bolivia-Brazil gas pipeline crossing through an embankment over a corrugated drainage pipe, at Km 247 in Mato Grosso do Sul, Brazil; Melhorias para estabilidade do gasoduto Bolivia-Brasil em cruzamento de aterro sobre tubo de drenagem tipo ARMCO, no km 247 em Mato Grosso do Sul

    Energy Technology Data Exchange (ETDEWEB)

    Jorge, Kemal Vieira [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil); Costa, Cesar Augusto [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Campo Grande, MS (Brazil). Gerencia Regional Centro Oeste (CRGO)

    2005-07-01

    A hundred and seventy kilometers from Campo Grande city, on Mato Grosso do Sul State, the Brasil-Bolivia Gas Pipeline crosses a 8,5 meters high landfill, over a drainage systems made of a 2,8 meters of diameter corrugated pipe. This drainage pipe was installed to allow the drainage of the valley, and the landfill above it was built so the Gas pipeline could cross easier the 80 meters deep and 30 degree vertices valley. This paper illustrates the work tasks and solutions taken to monitor and guarantee the integrity of the drainage and landfill structures, as well as the integrity of the Gas Pipeline. Some of the work tasks illustrated are the investigation of the support conditions of the Gas Pipeline, the analysis of a drainage system under the pipeline, on a rocky soil, the analysis of the stability of the landfill, the construction of a gravity retaining walls and the monitoring of the deformations on the drainage pipe. (author)

  15. The repair of ground cover of Bolivia-Brazil gas pipeline near Paraguay River crossing, in a swamp soft soil region, using geo synthetics reinforced backfilling; Reparo da cobertura do gasoduto Bolivia-Brasil junto ao Rio Paraguai, em trecho com solo mole, utilizando aterro reforcado com geosinteticos

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Cesar Augusto; Jorge, Kemal Vieira; Bechuate Filho, Pedro [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Campo Grande, MS (Brazil). Gerencia Regional Centro Oeste (CRGO); Teixeira, Sidnei H.C. [Geohydrotech Engenharia S.C. Ltda., Braganca Paulista, SP (Brazil)

    2005-07-01

    TBG - Transportadora Gasoduto Bolivia-Brasil S.A, executes routine maintenance works at the Gas Pipeline Right of Way, seeking its integrity. In the wetlands of Pantanal, near the Paraguay river crossing, the organic-alluvial soil was submitted to the process of subsidence. This process, associated with the river water flow erosion, shrank the soil volume and diminished or extinguished the pipeline land cover. The pipeline was exposed to the environment, and submitted to tension stresses and the risk of low cycle fatigue during the floods. The cathodic protection system also had to be evaluated, specially in the drought. To mitigate the problem, the embankment technique was adopted using sandy soil, reinforced with polyester geo-webs and with woven polipropene geo-textiles. The solution also used geo-webs with soil-cement as protection elements against the degradation of the geo-textiles blankets. Some monitoring works are associated with those interventions: monitoring of cathodic protection; topographical verification of horizontal and vertical displacements of the pipeline; levels of land covering, and rainfalls and flood measurement. The base of the embankment was built with hydraulic transported soil, and at the end consistently supported the gas pipeline. (author)

  16. Economic approach of pipelines: TBG (Transportadora Brasileira Gasoduto Brasil-Bolivia) case; Analise economica de gasoduto: o caso TBG (Transportadora Brasileira Gasoduto Brasil-Bolivia)

    Energy Technology Data Exchange (ETDEWEB)

    Pinho, Celso P.; Pettendorfer, Erick P. [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The objective of this paper is offer to the industry an example of successful project finance in an emergent country. The Bolivia-Brazil pipeline was projected to develop an industry of natural gas in Brazil. The total costs invested was around US$ 1, 5 billion (Brazilian side) and BID, BIRD, CAF, BEI, BNDES- Finame, Marubeni, Mediocredito with main lenders. There are tree contracts with Ship or Pay clauses that are the main guarantees of the project. We will describe the mains variables of this project and the economic model that was created to calculate the tariff and project all financial reports of Bolivia-Brazil Pipeline. (author)

  17. Integration Strategy for the Southern Cone Gas Networks

    OpenAIRE

    World Bank

    2007-01-01

    Experts from the governments of Argentina, Bolivia, Brazil, Chile, Paraguay, Peru and Uruguay, who participated in this strategic study for the Southern Cone Gas Pipeline Networks, combined their efforts to identify a shared energy alternative which would help boost the development of natural gas in the sub region, and, thus, its sustainable economic development. This study was developed i...

  18. Loading and stress analysis of gas pipeline structures; Analise de esforcos e tensoes em estruturas de gasodutos durante despressurizacoes

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Frota, Cristiane Souto [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil); Silva, Luis Fernando Figueira da; Carvalho, Marcio da Silveira [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica; Savi, Marcelo Amorim [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Dept. de Engenharia Mecanica; Pacheco, Pedro Manuel Calas Lopes [Centro Federal de Educacao Tecnologica do Rio de Janeiro (CEFET-RJ), Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Repairing and maintenance activities on Bolivia-Brazil gas pipeline often need blow down lines. During the blow down process, the high speed of discharging gases imposes great efforts to the structures. A detailed analysis of this situation is essential for a safe operation. This paper describes two phases of a project, developed under TBG coordination. It consists in analyzing the stress and forces involved in this operation, in order to design facilities to blow down pipes and develop a safe blow down procedure for the gas pipeline. The first phase consists of a supersonic flowing simulation in the blow down gas pipeline device. The pressure behavior, mass flow and the speed at the device's ending point are calculated for different operational conditions. In the second phase, the equivalent loading caused by blow down operations is used as input in a stress analysis program to determine stress, critical sessions evaluation and material recommendations for blow down devices. (author)

  19. Integrity management of Brazil-Bolivia gas pipeline to reduce risks due third party damage

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcellos, Carlos Renato Aragonez de; Monte, Oswaldo [PETROBRAS, Rio de Janeiro, RJ (Brazil); Colen, Eustaquio; Cunha, Roberto de Souza; Oliveira, Hudson Regis de [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Lima, Rogerio de Souza [RSL Consultoria Geoprojetos (Brazil); Schultz Neto, Walter [Milton Braga Assessoria Tecnica (Brazil)

    2005-07-01

    The Bolivia-Brazil Natural Gas Pipeline has 2.600 kilometers from Rio Grande City in Bolivia to Canoas City, in the south of Brazil. The right-of-way crosses a lot of types of topography and areas subjected to various kinds of anthropological actions, like areas in class locations 3, locals under agricultural activities, forests and minerals explorations, and near constructions of highway and railway, industrial constructions, new pipelines in the same right-of -way, channels, dams, that requires special projects to avoid that the gas pipeline could be subject to strengths that were not consider in the original design. The aim of this paper is to present the jobs developed by TBG during seven years of gas pipeline operations, as public awareness program, procedures to design, construct and inspect specials constructions along and near the right-of -way, control of mineral and forest explorations, monitoring and controlling of excavations on the right-of-way to install new pipelines and optical cables, to reduce risks of gas pipeline damage due third party, as a component of TBG' Managing Integrity Gas Pipeline Program. (author)

  20. 77 FR 70543 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2012-11-26

    ... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under... TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and...

  1. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2013-11-26

    ... gas pipelines and for hazardous liquid pipelines. Both committees were established under the Federal... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous...

  2. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  3. TBG's equipment for gas pipeline repair and bypass in service; Equipamentos da TBG para execucao de reparos e bypass em operacao no Gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Lemgruber, Nelson Arthur Pinto; Vasconcellos, Carlos Renato Aragonez de; Frota, Cristiane Souto [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The Bolivia-Brazil Natural Gas Pipeline - GASBOL - begins in the city of Santa Cruz of La Sierra, in Bolivia, arriving in Canoas (RS), in Brazil, traveling an extension of 3.150 km. TBG is the owner and operator from 2.593 km in Brazilian soil, with maximum nominal diameter 32 inches, capacity of transportations until 30 million cubic meter a day, and MAOP 100 bar. This work presents the main available resources in TBG for repair of the gas pipeline, as clamps for small repairs, bolt-on clamps, equipment for hot tapping and execution of by pass in-service, cold cutter machine, air movers for removal the gas of the line, and movable systems of emergency illumination. The location of the equipment is detailed, the main technical and operational characteristics, as well as aspects observed in simulated accomplished in the operational units of TBG and presents the planning for acquisition of new equipment. (author)

  4. Legal and regulatory possibility of connection between interstate natural gas distribution networks instead of constructing transport pipelines; Possibilidade juridoco-regulatoria da conexao interestadual entre redes de distribuicao de gas natural como alternativa a construcao de gasodutos de transporte

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Gustavo Mano [Andrade, Mano - Advogados, Rio de Janeiro, RJ (Brazil)

    2012-07-01

    According to Revista Brasil Energia (2011a), the local natural gas distribution concessionaire in the State of Sao Paulo Gas Brasiliano Distribuidora - GBD, plans to expand its distribution pipeline network in western Sao Paulo up to the border of the State of Minas Gerais, near the region known as Minas Triangle where a connection with the pipeline network of the State of Minas Gerais' natural gas distribution company, Companhia de Gas de Minas Gerais - GASMIG shall be built in order to supply natural gas to an ammonia plant to be built by PETROBRAS in the City of Uberaba. Still according to the publication, the project described above would be an alternative to the construction of a transportation pipeline that, since the enforcement of the Gas Law - Law No. 11.909/09 (Brasil, 2009), should be subject to concession contracts preceded by a complex, and probably delayed, planning and procurement. However, there is a transportation pipeline project, deriving from the Bolivia-Brazil transportation pipeline near the city of Sao Carlos, in Sao Paulo, crossing the Minas Triangle and finishing in the State of Goias. This project is owned by TGBC Company. The existence of two gas pipeline projects with very similar paths to supply virtually the same regions and based on different regulatory frameworks, one consisting of a connection between the distribution networks of different States and another based on the concept of pipeline transportation of gas under the legal and regulatory federal jurisdiction raises the discussion about the possibility of legal and regulatory interstate connections of distribution pipeline networks as an alternative to planning, allocation and construction of a transportation pipelines. This article aims to examine the legal and regulatory foundations of both alternatives and delineate the limits of performance of States and Federal Government on legislation and regulation concerning the movement of natural gas pipeline through the Country

  5. 77 FR 2126 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-01-13

    ... Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety... 72878), titled: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements... registry of pipeline and liquefied natural gas operators. FOR FURTHER INFORMATION CONTACT: Jamerson...

  6. The Alaskan gas pipeline conflict

    Energy Technology Data Exchange (ETDEWEB)

    Savich, P.; Fraser, N.M.; Hippel, K.W.

    1983-03-01

    A new conflict analysis technique is employed to study the dispute surrounding the selection of a natural gas pipeline route to transport gas from the American state of Alaska and also northern Canada to southern markets in the United States and Canada. The improved metagame analysis algorithm is the type of conflict analysis method that is used for providing a framework to study systematically the Alaskan gas pipeline controversy and to put the historical information into proper perspective. In addition, the methodology is utilized for predicting the possible feasible political solutions to the conflict.

  7. Anping-Nanjing Gas Pipeline Formally Commissioned

    Institute of Scientific and Technical Information of China (English)

    Zhang Jicheng

    2006-01-01

    @@ On January 17, 2006, gas from Changqing gasfield in northern Shaanxi Province was poured into Anping-Nanjing gas pipeline, marking that the trunk line was successfully brought into operation and the West-East Gas Pipeline and No.2 Shaanxi-Beijing pipeline were successfully connected. Pressure was boosted immediately after its commissioning to ensure gas supply to Beijing and Shanghai. Gas supply to part areas along this pipeline will begin by May, 2006.

  8. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    .... On October 18, 2010 (75 FR 63774) PHMSA published an ANPRM titled ``Pipeline Safety: Safety of On... rules (65 FR 75378; 12/1/ 2000 and 67 FR 2136; 1/16/2002) requiring IM Programs for hazardous liquid pipeline operators. In 2003, similar IM regulations were enacted for gas pipelines (68 FR 69778;...

  9. North Slope pipeline work strong; gas pipeline project deferred

    Energy Technology Data Exchange (ETDEWEB)

    Hale, D.

    1982-09-01

    Over 225 miles of insulated pipelines will be installed on the North Slope as part of a 5-year, $10.5 billion program by Sohio and Arco to maintain output from the field to feed the trans-Alaska oil pipeline. New lines are for waterflood supply systems, low pressure production systems, produced water handling, and gas handling. Pipeline construction is quite active at both Prudhoe Bay and at Kuparuk Field. Future projects include an oil line to the Beaufort Sea, the Polar Gas Project, the Arctic Pilot project, and the Northern Tier Pipeline.

  10. PETROCHINA WEST EAST GAS PIPELINE & SALES COMPANY

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ PetroChina West East Gas Pipeline & Sales Company, a regional company directly under PetroChina Company Limited (PetroChina), is responsible for the construction and operation of the West-East Gas Pipeline Project, and the gas marketing and sales of the natural gas market in China.

  11. California Natural Gas Pipelines: A Brief Guide

    Energy Technology Data Exchange (ETDEWEB)

    Neuscamman, Stephanie [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pezzola, Genny [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  12. Necessary conditions for the planning on the natural gas market; Condicoes necessarias para o planejamento no mercado de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Edmar de; Iootty, Mariana

    2007-07-01

    In 2004, the natural gas agents discovered a radical change in the sector panoram. Since 1998, when the Bolivia-Brazil gas pipeline was inaugurated, the market situation was a supply excess. The major problem of the distributors and the PETROBRAS was how to accelerate the market development to accomplish with the contract for buying natural gas compromised with Bolivia. From 2004 on progressively, the supply insurance occupied the discussions agenda. The agents discovered to be real the risks of the supply not to follow the demand.

  13. Future impact on natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Croom, J.H.

    1982-01-01

    The future for natural gas pipelines is forecast by examining the sources and uses of energy today and projecting respective changes. No significant changes are expected over the next 20 yr in natural gas usage, but regionally, some demand shift could impact certain gas transmission facilities. The conclusion is that natural gas will continue to displace oil in some stationary uses, while coal will displace natural gas in some power plant and feedstock applications. Although these shifts will result in some regional construction activity, they will probably not necessitate major arterial increases to the pipeline network. However, significant changes in supply sources may have a major impact on pipeline planning and construction.

  14. China Oil & Gas Pipeline Survey & Design Institute, Pipeline

    Institute of Scientific and Technical Information of China (English)

    Bureau of CNPC; Zhao Surong

    1995-01-01

    @@ China Oil/Gas Pipeline Bureau(P.B) is the only professional organization in China specialized in oil/gas pipelines design and construction since 1980s. It has ever cooperated with certain number of well known companies from Japan,USA, Germany, Canada, as well as Italy in the designs of many large oil/gas pipeline projects, during the course of which, personnel from P.B accumulated much experience in international project designs. During the execution of each particular project, they strictly followed the common-use international codes and standards with computers as the auxiliary design system combined with the self-developed software. All its clients showed their trust in this organization and gave it high praise for its outstanding survey, design and technical service.

  15. Pipelines jockey to serve Florida gas market

    International Nuclear Information System (INIS)

    This paper reports that Florida Gas Transmission Corp. (FGT), Houston, appears to have taken the lead in competition to serve Florida's growing gas markets. Florida Power and Light (FPL), Miami, decided to reserve transportation capacity on FGT's proposed Phase III expansion rather than the Sun Coast pipeline proposed by United Gas Pipe Line Co. (UGPL), Houston, and Coastal Corp. unit ANR Pipeline Co., Detroit (OGJ, Aug. 31, p. 31). Withdrawal of FPL, Florida's largest electric utility, from Sun Coast left the proposed 560 mile, 400 MMcfd intrastate gas transmission pipeline with only one major prospective client, Florida Power Corp., St. Petersburg. That forces UGPL and ANR to dissolve the partnership

  16. Black powder in gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sherik, Abdelmounam [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Despite its common occurrence in the gas industry, black powder is a problem that is not well understood across the industry, in terms of its chemical and physical properties, source, formation, prevention or management of its impacts. In order to prevent or effectively manage the impacts of black powder, it is essential to have knowledge of its chemical and physical properties, formation mechanisms and sources. The present paper is divided into three parts. The first part of this paper is a synopsis of published literature. The second part reviews the recent laboratory and field work conducted at Saudi Aramco Research and Development Center to determine the compositions, properties, sources and formation mechanisms of black powder in gas transmission systems. Microhardness, nano-indentation, X-ray Diffraction (XRD), X-ray Fluorescence (XRF) and Scanning Electron Microscopy (SEM) techniques were used to analyze a large number of black powder samples collected from the field. Our findings showed that black powder is generated inside pipelines due to internal corrosion and that the composition of black powder is dependent on the composition of transported gas. The final part presents a summary and brief discussion of various black powder management methods. (author)

  17. City gates maintenance - TBG experience; Experiencia da TBG na manutencao de estacoes de entrega de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, Adir de Brito; Tavares, Cipriano Homem; Pinto, Jose Eduardo Christovao [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Owner and sole operator in Brasilian territory of the Bolivia-Brazil Gas Pipeline (GASBOL), the largest of its kind in South America, TBG started operations on July 1 st, 1999. Since then, it has ensured transportation of Bolivian natural gas into Brazil swiftly and safely. This paper relates the TBG experiences on Natural Gas City Gates maintenance and its components like filtering, heating, pressure reducing redundant valves, turbine meters, flow computers, solar panel power supply, satellite monitoring system, acquired by 6 years of operation of Brazil Bolivia Gas Pipe Line. It describes the definitions of maintenance plans using RCM - Reliability-centered Maintenance concepts and the most important learning experiences. (author)

  18. STATUS AND PROSPECT OF OIL AND GAS PIPELINES IN CHINA

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    @@ With the exploration and development of natural gas and the increase of crude oil import, the industry of China's Oil and Gas Pipelines has witnessed rapid development. Especially the gas pipeline industry is entering a peak period of development. Thanks to the completion and operation of large-scale pipeline projects including West-East Gas Transportation Pipeline project,Shanxi-Beijing Gas Pipeline Ⅱ, Ji-Ning Pipeline,Huaiyang-Wuhan Pipeline, Guangdong LNG Pipeline,Western Pipeline and Pearl River Delta Oil Product Pipeline, many trans-regional gas and oil pipeline networks with initial scale have been gradually established and improved in China. Meanwhile, the metallurgy,manufacturing and construction level of pipelines has been greatly developed, achieving world top level. The next five years is still a peak period of development for China's gas and oil pipeline industry which will enjoy a broader prospect.

  19. Australia's changing natural gas and pipeline industry

    International Nuclear Information System (INIS)

    The future is bright for continued development of Australia's natural gas pipeline infrastructure, as well as for privatization and private energy infrastructure growth. Gas demands are growing and the development of open access principles for all natural gas transmission and distribution pipelines heralds a much more market focused industry. Within the next few years gas-on-gas competition will apply to supply, pipelines, and retail marketing. No longer will operators be able to pass on high costs resulting from inefficiencies to their customers. This article describes the changing Australian gas industry, evaluates the drivers for change and looks at ways the industry is responding to new regulatory regimes and the development and use of new pipeline technology

  20. 77 FR 16471 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-03-21

    ...: Implementation of the National Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and... registry of pipeline and liquefied natural gas operators. This notice provides updates to the information... the Federal Register (75 FR 72878) titled: ``Pipeline Safety: Updates to Pipeline and...

  1. 76 FR 28326 - Pipeline Safety: National Pipeline Mapping System Data Submissions and Submission Dates for Gas...

    Science.gov (United States)

    2011-05-17

    ... Systems and Liquefied Natural Gas Annual Reports AGENCY: Pipeline and Hazardous Materials Safety... operators of gas transmission and gathering systems and Liquefied Natural Gas (LNG) facilities that they... to Pipeline and Liquefied Natural Gas Reporting Requirements'' (One Rule). This rulemaking...

  2. Market Brief : Turkey oil and gas pipelines

    International Nuclear Information System (INIS)

    This report presented some quick facts about oil and gas pipelines in Turkey and presented opportunities for trade. The key players and customers in the oil and gas sector were described along with an export check list. Turkey is looking into becoming an energy bridge between oil and gas producing countries in the Middle East, Central Asia and Europe. The oil and gas sectors are dominated by the Turkish Petroleum Corporation, a public enterprise dealing with exploration and production, and the State Pipeline Corporation which deals with energy transmission. They are also the key buyers of oil and gas equipment in Turkey. There are several pipelines connecting countries bordering the Caspian Sea. Opportunities exist in the areas of engineering consulting as well as contracting services for oil and gas pipeline transmission and distribution. Other opportunities lie in the area of pipeline construction, rehabilitation, materials, equipment, installation, and supervisory control and data acquisition (SCADA) systems. Currently, the major players are suppliers from Italy, Germany, France, United States and Japan. Turkey has no trade barriers and imported equipment and materials are not subjected to any restriction. The oil and gas market in Turkey expected in increase by an average annual growth rate of 15 per cent from 2001 to 2003. A brief description of pipeline projects in Turkey was presented in this report along with a list of key contacts and support services. 25 refs., 1 append

  3. BC Alaska-Canada gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    MacDonald, K. [BP Canada Energy Company, Calgary, AB (Canada). BP Alaska Canada Gas Pipelines

    2006-07-01

    The Alaska natural gas pipeline project was discussed in relation to the Canadian oil and gas industry and pipeline infrastructure. Total project costs for the pipeline were estimated at approximately $20 billion. Options out of Alberta include increasing existing capacity to the west coast, as well as expanding pipeline capacity to supply midwest and east coast markets. Existing pipeline systems will be expanded, and a new pipeline from Alaska to Chicago has been proposed. The gas pipeline project is expected to be the largest private construction project in the history of North America, and will provide 6500 jobs in both the United States and Canada. Project challenges to date have included the development of relationships with Aboriginals and First Nations groups in Canada and the United States, as well as ensuring access to efficient, competitive market-based regulatory processes. Project risks to date have included capital and operating cost over-runs, regulatory and legal delays, completion risks, and commodity price risks. Stranded gas act processes were discussed, as well as fiscal contracts related to the legislative and public process. Elements of the fiscal contract were provided, as well as details of First Nations relationships and Crown consultation processes. tabs., figs.

  4. Review of Oil and Gas Pipeline Construction in 2007

    Institute of Scientific and Technical Information of China (English)

    Qu Hong

    2008-01-01

    @@ China's pipeline industry has developed for 50 years till 2008. In the past 10 years, more than 50,000 kilometers of long-distance oil and gas pipelines have been constructed,of which gas pipelines reached about 30,000 kilometers,crude oil pipelines about 17,000 kilometers, and product oil pipelines about 7,000 kilometers. Oil and gas pipeline networks across regions have taken shape.

  5. 78 FR 41496 - Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees

    Science.gov (United States)

    2013-07-10

    ... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Meetings of the Gas and Liquid... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under.... ACTION: Notice of advisory committee meeting. SUMMARY: This notice announces a public meeting of the...

  6. Multinational Gas Pipeline Hopeful on Schedule

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    @@ The Kovykta project, which will transport natural gas from Russia's Eastern Siberia to China and Republic of Korea, might come out ahead over the Sino-Russian oil pipeline project. China and Russia are negotiating the price of the piped gas and the result of negotiations will likely be seen in three to four months, TNK-BP President and Chief Executive Officer Robert Dudley recently said,adding that he is confident that natural gas from Kovykta will start flowing through the pipeline by the end of 2008 as planned.

  7. Shaan-Jing Gas Transmission Pipeline

    Institute of Scientific and Technical Information of China (English)

    Deng Diqun

    1997-01-01

    @@ The gas transmission pipeline under construction from Shaan-Gan-Ning Gas Field, western China to Beijing,is of the longest transmission distance and the largest diameter of the kind so far in China. Under complex geomorphologic and geological conditions along its stretch, strict criteria are demanded for its engineering design and construction.

  8. Emergency gas pipeline transportation with computer documentation

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-08-01

    Methods developed by the staff of the Federal Energy Regulatory Commission in cooperation with the natural gas industry to expedite the emergency transfer of natural gas are described. The majority of the United States' natural gas fields are concentrated in the south central region, comprised of Louisiana, Oklahoma, and Texas together with adjacent areas offshore in the Gulf of Mexico. This is the major source area for gas consumed in the northern, northeastern, southeastern, and far western population/industrial centers. The geographic pattern of gas flow through interstate pipelines emanates in gas producing areas and terminates in gas consuming areas. There are many other areas in the United States which produce gas but the amounts are comparatively small compared with Texas, Louisiana, and offshore Louisiana production. The various interconnections associated with a given pipeline for both receipts and deliveries are defined. The maximum volume capability in MMCFD and the volume being delivered in MMCFD are to be considered as estimated volumes. These volumes do not represent absolute volumes that are available but rather volumes for general planning purposes to define the magnitude of each interconnection. If an actual transportation route is desired, a routing may be derived from this report which then must be checked for actual volumes at a particular point in time. It is always possible that at the time of interest, there is no available capacity or deliveries.The data and information are arranged by pipeline company name followed by which companies supply gas to the named pipeline and to which companies the named pipeline delivers gas. Each receipt or delivery location is defined by the county and state.

  9. A Cheap Levitating Gas/Load Pipeline

    OpenAIRE

    Bolonkin, Alexander

    2008-01-01

    Design of new cheap aerial pipelines, a large flexible tube deployed at high altitude, for delivery of natural (fuel) gas, water and other payload over a long distance is delineated. The main component of the natural gas is methane which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg (1 pound). The lightweight film flexible pipeline can be located in air at high altitude and, as such, does not damage the environment. Using the lift ...

  10. Northwest Asia - gas market outlook: LNG vs. pipeline gas

    International Nuclear Information System (INIS)

    The share of natural gas in Northeast Asia's energy mix is quite low despite that the region currently dominates the world LNG trade. In the long term, the region's rapid expansion of gas demand in the coming decades looks very likely, but the LNG dominance in the region's gas market will collapse in parallel with the introduction of a long distance pipeline gas. The most likely timing of pipeline gas introduction in Northeast Asian gas market seems to be during the second half of the next decade. (Author)

  11. A Cheap Levitating Gas/Load Pipeline

    CERN Document Server

    Bolonkin, Alexander

    2008-01-01

    Design of new cheap aerial pipelines, a large flexible tube deployed at high altitude, for delivery of natural (fuel) gas, water and other payload over a long distance is delineated. The main component of the natural gas is methane which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg (1 pound). The lightweight film flexible pipeline can be located in air at high altitude and, as such, does not damage the environment. Using the lift force of this pipeline and wing devices payloads of oil, water, or other fluids, or even solids such as coal, cargo, passengers can be delivered cheaply at long distance. This aerial pipeline dramatically decreases the cost and the time of construction relative to conventional pipelines of steel which saves energy and greatly lowers the capital cost of construction. The article contains a computed project for delivery 24 billion cubic meters of gas and tens of million tons of oil, water or other payload per year.

  12. PetroChina Sees Gas Pipeline Profit in Four Years

    Institute of Scientific and Technical Information of China (English)

    Xiao Lu

    2002-01-01

    @@ Sebei-Xining- Lanzhou pipeline put into operation PetroChina, the nation's largest gas producer,recently said that the US$280-million gas pipeline in Northwest China would generate profits within four years.

  13. Liquid holdup in wet-gas pipelines

    International Nuclear Information System (INIS)

    An experimental study of two-phase flow was conducted to investigate liquid holdup in wet-gas pipelines. The liquid-holdup data were obtained by passing spheres through a 1,333-ft [406.3-m] -long, 3.068-in. [77.93-mm] -ID horizontal pipe and measuring the liquid volumes removed. Three different two-phase mixtures were used. The holdup data were compared with predicted holdup values and were used to evaluate a mechanistic model for stratified flow. None of the methods could accuratly predict liquid holdup in this low-holdup region. Two new empirical liquid-holdup correlations for horizontal flow were proposed. The first is strictly for wet-gas pipelines (0< y/sub L/<0.35); the second is for any horizontal pipeline (0< y/sub L/<1.0)

  14. Foreign Giants Take Gas Pipeline Stake Equally

    Institute of Scientific and Technical Information of China (English)

    Xie Ye

    2002-01-01

    @@ Oil giants Royal/Dutch, ExxonMobil and Russia's Gazprom have agreed to take 15 percent stakes each in China's US$5.6 billion natural gas pipeline project,clearing away the final obstacles blocking the kickoff of the repeatedly delayed project, according to the latest reports from news media in early July.

  15. Microwave Radar Detection of Gas Pipeline Leaks

    Science.gov (United States)

    Gopalsami, N.; Kanareykin, D. B.; Asanov, V.; Bakhtiari, S.; Raptis, A. C.

    2003-03-01

    We are developing a microwave radar sensing and imaging system to detect and locate gas leaks in natural gas pipelines. The underlying detection principle is radar backscattering from the index-of-refraction inhomogeneities introduced by the dispersion of methane in air. An essential first step in the development effort is modeling to estimate the radar cross section. This paper describes the modeling results and the experimental efforts underway to validate the model. For the case of leaks from small holes in a pressurized gas pipeline, we modeled the gas dynamics of the leak jet to determine the plume geometry and the variation of methane concentration in air as a function of distance from the leak source. From the static and dynamic changes in the index of refraction in the turbulent plume, the radar backscatter cross sections were calculated. The results show that the radar cross sections of the leak plumes should be detectable by special-purpose radars.

  16. Natural gas pipeline leaks across Washington, DC.

    Science.gov (United States)

    Jackson, Robert B; Down, Adrian; Phillips, Nathan G; Ackley, Robert C; Cook, Charles W; Plata, Desiree L; Zhao, Kaiguang

    2014-01-01

    Pipeline safety in the United States has increased in recent decades, but incidents involving natural gas pipelines still cause an average of 17 fatalities and $133 M in property damage annually. Natural gas leaks are also the largest anthropogenic source of the greenhouse gas methane (CH4) in the U.S. To reduce pipeline leakage and increase consumer safety, we deployed a Picarro G2301 Cavity Ring-Down Spectrometer in a car, mapping 5893 natural gas leaks (2.5 to 88.6 ppm CH4) across 1500 road miles of Washington, DC. The δ(13)C-isotopic signatures of the methane (-38.2‰ ± 3.9‰ s.d.) and ethane (-36.5 ± 1.1 s.d.) and the CH4:C2H6 ratios (25.5 ± 8.9 s.d.) closely matched the pipeline gas (-39.0‰ and -36.2‰ for methane and ethane; 19.0 for CH4/C2H6). Emissions from four street leaks ranged from 9200 to 38,200 L CH4 day(-1) each, comparable to natural gas used by 1.7 to 7.0 homes, respectively. At 19 tested locations, 12 potentially explosive (Grade 1) methane concentrations of 50,000 to 500,000 ppm were detected in manholes. Financial incentives and targeted programs among companies, public utility commissions, and scientists to reduce leaks and replace old cast-iron pipes will improve consumer safety and air quality, save money, and lower greenhouse gas emissions.

  17. Research into the transmission of natural gas by gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Gadonneix, P.

    1998-12-31

    This paper is the press release of the talk given at the `Gaz de France scientific meeting with the press` by P. Gadonneix, chairman of Gaz de France company, on October 7, 1998. The aim of this talk concerns the new French and European supply link for bringing natural gas from the Norwegian North Sea fields. This new supply link is the first direct link between Norway and France and the NorFra gas pipeline which brings natural gas from the North Sea to France is the longest offshore pipeline in the world. The `Artere des Hauts de France` pipeline (the largest diameter gas pipeline ever laid in France) is devoted to the transfer of natural gas from Dunkerque to the Gournay-sur-Aronde underground storage site. This paper describes successively: the French European gas supply hub, the NorFra project, the Artere des Hauts de France pipeline, the network performance research, the safety and quality guaranties, the reduction of overland natural gas transmission costs (improvement of pipe-laying techniques and optimization of line route and welding operations), the specific techniques used for road and river crossing (micro-tunnel digging, river-crossing ditches) and for anchoring (buoyancy compensation). Finally, the environmental impact of the laying operations is briefly described. (J.S.)

  18. Gas supplies of interstate/natural gas pipeline companies 1989

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-18

    This publication provides information on the interstate pipeline companies' supply of natural gas during calendar year 1989, for use by the FERC for regulatory purposes. It also provides information to other Government agencies, the natural gas industry, as well as policy makers, analysts, and consumers interested in current levels of interstate supplies of natural gas and trends over recent years. 5 figs., 18 tabs.

  19. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... August 25, 2011, (76 FR 53086) PHMSA published in the Federal Register an Advance Notice of Proposed... by email at mike.israni@dot.gov . SUPPLEMENTARY INFORMATION: On August 25, 2011, (76 FR 53086), PHMSA... Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 RIN 2137-AE72 Pipeline...

  20. Engineering Design of Shaanxi-Beijing Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    Xiang Bo; Mei Sanqiang; Wang Wei

    1996-01-01

    @@ Steel pipes of Φ660×60 are used in the gas pipeline,totaling 860 km in length,from Shaan-Gan-Ning gas field,to Beijing(Shaan-Jing pipeline for short).The maximum operating pressure of the pipeline is designed to be 6.3Mpa,and the maximum annual natural gas deliverability is set to be 2×109m3.

  1. Development Prospect of Oil & Gas Pipelines of CNPC

    Institute of Scientific and Technical Information of China (English)

    Feng Yaorong; Chen Hao; Zhang Jinjun; Zhang Kegang

    2008-01-01

    Prospect of engineering technologies for pipelines in China In recent years, China National Petroleum Corporation (CNPC) has made remarkable achievements in the field of oil and gas transmission pipeline engineering. The demand for oil and gas has increased a lot, along with the rapid development of national economy and the improvement of people's living standard. In the days to come, China will witness an even greater development in the engineering construction of oil and gas transmission pipelines.

  2. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  3. Current Status and Prospects of Oil and Gas Pipelines in China

    Institute of Scientific and Technical Information of China (English)

    Pu Ming

    2010-01-01

    @@ By the end of 2009,the total length of existing oil and gas pipelines in China had reached 75×103 km.The pipelines include 38×103 km of gas pipelines,20×103km of crude oil pipelines and 17×103 km of oil product pipelines,framing a trans-regional pipeline network for the oil and gas delivery.

  4. Development Prospect of Oil & Gas Pipelines of CNPC

    Institute of Scientific and Technical Information of China (English)

    Feng Yaorong; Chen Hao; Zhang Jinjun; Zhang Kegang

    2008-01-01

    @@ Technology progress of oil & gas pipelines transportation project of CNPC since the 11th Five-Year Plan period An introduction to oil & gas pipelines transportationproject As a large industrious system, pipelines transportation industry is playing a more and more important role in oil and natural gas industry even in the world economy.Thanks to the efforts of 40 years, substantial progress has been achieved in the oil & gas pipelines construction in China. Till now, long distance oil & gas transportation trunk pipelines with large caliber have been completed one after another, with a total length exceeding 50 thousand kilometers (kin). CNPC boasts a long distancel and oil transportation pipeline of 30 thousand km.

  5. Managing changes of location classes of gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Sergio B.; Sousa, Antonio Geraldo de [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Most of the gas pipeline design codes utilize a class location system, where the design safety factor and the hydrostatic test factor are determined according to the population density in the vicinities of the pipeline route. Consequently, if an operator is requested or desires to maintain an existing gas pipeline in compliance with its design code, it will reduce the operational pressure or replace pipe sections to increase the wall thickness whenever a change in location class takes place. This article introduces an alternative methodology to deal with changes in location classes of gas pipelines. Initially, selected codes that utilize location class systems are reviewed. Afterwards, a model for the area affected by an ignition following a natural gas pipeline leak is described. Finally, a methodology to determine the MAOP and third part damage mitigation measures for gas transport pipelines that underwent changes in location class is presented. (author)

  6. Natural gas pipelines: emerging market challenges

    International Nuclear Information System (INIS)

    The Australian gas industry has come a long way in recent years. Most of the formerly government owned gas transmission, distribution and retail businesses have been privatised; major utility companies have been fundamentally restructured; the convergence of energy markets has seen many companies stepping outside the boundaries of their traditional businesses; and national competition policy has led to profound changes in the regulatory landscape. Yet despite the magnitude of these changes, it is clear that the journey of competitive reform has a long way to go. The Australian Gas Association's Industry Development Strategy identifies the potential for gas to increase its share of Australia's primary energy market, from around 18 percent at present to 22 percent by 2005, and 28 percent by 2015. Our analysis, using ACIL's Eastern Australian Gas Model, clearly shows that in the absence of major new sources of gas, these challenging targets will not be met and, indeed, there will be an increasing supply shortfall. However, with the emergence of new competitive supply sources such as Papua New Guinea and the Timor Sea, our modelling suggests that most of this demand can be satisfied at prices which will maintain gas' competitiveness in energy markets. Such developments provide both opportunities and challenges for the industry. In particular, they will profoundly affect the owners and operators of transmission pipeline systems. (Authors)

  7. Natural Gas Gathering and Transporting Pipeline Networks in Sichuan Province

    Institute of Scientific and Technical Information of China (English)

    Zhou Xuehou

    1995-01-01

    @@ It is over 30 years since Baxian-Chongqing Gas Transmission Pipeline has been put into operation in 1960s. So far approximately 8 000 km pipelines of various kinds have been built in Sichuan, among which about 1 800 km are gas pipelines (the maximum diameter of 720 mm ),therefor a gathering pipeline system has been established which connects more than 80 gas fields over ten of major industrial cities in Sichuan, such as Chengdu, Chongqing,Zigong, Luzhou, Daxian, Deyang, Mianyang, Nanchong,and more than 600 large and medium size end-users and the chemical fertilizer manufacturing bases in the neighboring provinces of Yunnan and Guizhou.

  8. Research on Optimization Operation of Urban Gas Pipeline Network

    Institute of Scientific and Technical Information of China (English)

    田一梅; 迟海燕; 李鸿; 周颖

    2003-01-01

    The optimization operation of gas pipeline network is investigated in this paper. Based on the theories of system optimization and the multi-object decision, a mathematical model about the multi-object optimization operation of gas pipeline network is established, in line with the demand of urban gas pipeline network operation. At the same time, an effective solution of the mathematical model is presented. A calculating software about optimization operation is compiled, coupling the actual operation of gas pipeline network. It can be applied to the operation of the gas pipeline network. The software was examined by real examples. The results indicated that 2.13%00 energy consumption and 3.12%oo gas supply cost can be reduced through optimization operation.

  9. 77 FR 28331 - Standards for Business Practices for Interstate Natural Gas Pipelines

    Science.gov (United States)

    2012-05-14

    ... Business Practices for Interstate Natural Gas Pipelines, notice of proposed rulemaking, 77 FR 10415 (Feb... Natural Gas Pipelines AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Request for additional... North American Energy Standards Board (NAESB) applicable to natural gas pipelines. The...

  10. Continuously Innovating Technology of Oil and Gas Pipeline in China

    Institute of Scientific and Technical Information of China (English)

    Yao Shihong; Yang Tianbing

    2009-01-01

    @@ Through fifty years' development and effort,oil and gas pipeline industry in China has created a selfdevelopment way under the country's characteristics which relies on scientific and technological innovation and introduction,assimilation and re-innovation.Along with the completion and application of West-East Gas Transmission Pipeline Ⅰ and starting construction of Line West-East Gas Transmission Pipeline Ⅱ,in the main technology field such as design and construction,the whole oil and gas pipeline industry has reached the international advanced level,even some have reached the international top level at present.Thanks to the development process of current economic globalization and technology internationalization,scientific and technological innovation as the inevitable choice to realize continuous,effective,fast and harmonious development of China oil and gas pipeline technology.

  11. 77 FR 34123 - Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines

    Science.gov (United States)

    2012-06-08

    ... published on December 4, 2009, (74 FR 63906). The rule required that operators of gas distribution pipelines... pipeline industry representatives on topics relating to their experiences implementing the distribution... to all. There is no cost to attend. The meeting will be held at the OMNI Hotel, 1300 Houston...

  12. Flags pipeline - first phase of UK gas gathering system

    Energy Technology Data Exchange (ETDEWEB)

    1983-06-01

    The Far North Liquids and Associated Gas System (FLAGS pipeline) is described. The building specifications for the pipeline are reviewed, and the end use of the pipeline to transport oil, natural gas liquids, and natural gas from the Brent field in the North Sea is discussed. Other fields now on the FLAGS include the Cormorant, Ninian, and North West Hutton fields, and the Magnus, Murchison, and Thistle fields will be added during 1983. The refinery and gas processing facilities on shore in Scotland also are described. Both building and operating problems are mentioned.

  13. Black powder removal in a Mexico gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Morrow, John R. [TDW Services, Inc., New Castle, DE (United States); Drysdale, Colin; Warterfield, Bob D. [T.D.Williamson, Inc., Tulsa, OK (United States)

    2008-07-01

    This paper focuses on the cleaning methodology and operational constrains involved with the removal of black powder in a high pressure natural gas transmission pipeline. In this case, the accumulation of black powder along the pipeline system over the seven year period since it was put into service was creating significant problems in the areas of maintenance, customer relations, and cost to the pipeline operator due to clogging of filters, reduced gas flow, and penalties as result of non-compliant delivery contracts. The pipeline cleaning project consisted of running cleaning pigs or scrappers with batches of cleaning solution through each section of the pipeline while dealing with such factors as three (3) pipeline section lengths in excess of 160 kms (100 miles), gas flow velocity fluctuations, shutdowns, and gas delivery schedule requirements. The cleaning program for the entire pipeline system included the use of chemical and diesel based cleaning solution, running multiple cleaning pigs, liquid injection and separation system, mobile storage tanks, various equipment and personnel for logistical support. Upon completion of the cleaning program, the level of black powder and other solids in all pipeline sections was reduced to approximately 0.5% liquid/solid ratio and the pipeline system returned to normal optimum operation. (author.

  14. Environmental analysis for pipeline gas demonstration plants

    Energy Technology Data Exchange (ETDEWEB)

    Stinton, L.H.

    1978-09-01

    The Department of Energy (DOE) has implemented programs for encouraging the development and commercialization of coal-related technologies, which include coal gasification demonstration-scale activities. In support of commercialization activities the Environmental Analysis for Pipeline Gas Demonstration Plants has been prepared as a reference document to be used in evaluating potential environmental and socioeconomic effects from construction and operation of site- and process-specific projects. Effluents and associated impacts are identified for six coal gasification processes at three contrasting settings. In general, impacts from construction of a high-Btu gas demonstration plant are similar to those caused by the construction of any chemical plant of similar size. The operation of a high-Btu gas demonstration plant, however, has several unique aspects that differentiate it from other chemical plants. Offsite development (surface mining) and disposal of large quantities of waste solids constitute important sources of potential impact. In addition, air emissions require monitoring for trace metals, polycyclic aromatic hydrocarbons, phenols, and other emissions. Potential biological impacts from long-term exposure to these emissions are unknown, and additional research and data analysis may be necessary to determine such effects. Possible effects of pollutants on vegetation and human populations are discussed. The occurrence of chemical contaminants in liquid effluents and the bioaccumulation of these contaminants in aquatic organisms may lead to adverse ecological impact. Socioeconomic impacts are similar to those from a chemical plant of equivalent size and are summarized and contrasted for the three surrogate sites.

  15. Energy geopolitics and Iran-Pakistan-India gas pipeline

    International Nuclear Information System (INIS)

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  16. Virtual Pipeline System Testbed to Optimize the U.S. Natural Gas Transmission Pipeline System

    Energy Technology Data Exchange (ETDEWEB)

    Kirby S. Chapman; Prakash Krishniswami; Virg Wallentine; Mohammed Abbaspour; Revathi Ranganathan; Ravi Addanki; Jeet Sengupta; Liubo Chen

    2005-06-01

    The goal of this project is to develop a Virtual Pipeline System Testbed (VPST) for natural gas transmission. This study uses a fully implicit finite difference method to analyze transient, nonisothermal compressible gas flow through a gas pipeline system. The inertia term of the momentum equation is included in the analysis. The testbed simulate compressor stations, the pipe that connects these compressor stations, the supply sources, and the end-user demand markets. The compressor station is described by identifying the make, model, and number of engines, gas turbines, and compressors. System operators and engineers can analyze the impact of system changes on the dynamic deliverability of gas and on the environment.

  17. Numerical modeling of fires on gas pipelines

    International Nuclear Information System (INIS)

    When natural gas is released through a hole on a high-pressure pipeline, it disperses in the atmosphere as a jet. A jet fire will occur when the leaked gas meets an ignition source. To estimate the dangerous area, the shape and size of the fire must be known. The evolution of the jet fire in air is predicted by using a finite-volume procedure to solve the flow equations. The model is three-dimensional, elliptic and calculated by using a compressibility corrected version of the k - ξ turbulence model, and also includes a probability density function/laminar flamelet model of turbulent non-premixed combustion process. Radiation heat transfer is described using an adaptive version of the discrete transfer method. The model is compared with the experiments about a horizontal jet fire in a wind tunnel in the literature with success. The influence of wind and jet velocity on the fire shape has been investigated. And a correlation based on numerical results for predicting the stoichiometric flame length is proposed. - Research highlights: → We developed a model to predict the evolution of turbulent jet diffusion flames. → Measurements of temperature distributions match well with the numerical predictions. → A correlation has been proposed to predict the stoichiometric flame length. → Buoyancy effects are higher in the numerical results. → The radiative heat loss is bigger in the experimental results.

  18. Pressure equivalents in industrial gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Metel' kov, V.P.

    1980-01-01

    Pressure equivalence is a mathematical concept used to explain action and load parameters for pipelines. These two parameters are congruent to pressures encountered in pipelines. The research examined pressure equivalence in 820 by 8 millimeter pipelines in the Samotlor region and took into account the influence of support jams during first and second category jamming. It was determined that the absolute dimensions to pressure pulsations were significantly larger than plus or minus ten percent from (Prab) and even exceeded (Prab) in certain instances. The ratios at which (Prab) can be exceeded vary with relation to the jam supports and the maximum variations stem from yield in the metal pipelines themselves. The above concepts can be used to study the effects of pressure equivalence upon loads and pressures of Samotlor field pipelines and to select appropriate pipeline planning and construction methods. The conclusions drawn are valid for industrial surface pipelines used at below limit pressures. Annular and daily temperature variations in the outside air are considered with regard to their effect upon the pressure equivalence within the lower sections of the pipeline. Deviations here have been noted to exceed (formula). It was observed that in the case of underground pipelines, operated at below limit pressures, pressure equivalence occured in the upper section of the pipeline.

  19. Risk from transport of gas by pipeline ''kokui-perm''

    International Nuclear Information System (INIS)

    Full text of publication follows: the length of gas pipelines in Russia is 142 thousands km, 62 % are pipelines of the large diameters. Annually on gas pipelines in Russia there are more than 70 large accidents, more than 50 % from them is accompanied by ignition of gas. The average ecological looses from accident is: destruction arable lands - 78 hectares; removing from consumption agricultural soils - 6,2 hectares; destruction forests - 47,5 hectares. In work the reasons of accidents on gas pipelines of different diameters are analyzed. So, for pipelines a diameter of 1220 mm by the reasons of accidents are: marriage of civil and erection works - 39, 1 %; outside corrosion - 35,9 %; mechanical damages - 9,4 %; defects of pipes - 6,2 %; defects of the factory equipment - 1,6 %; nature disasters and other reasons - 7,8 %. In work the results of risk analysis on a gas pipeline 'Kokui - Perm' are analysed. The gas pipeline 'Kokui - Perm' passes near 22 towns and countries, crosses 15 highways, 2 rail ways, 15 rivers. In work the concrete recommendations for management of risk and safety of the population are given. (author)

  20. Gas pipeline monitoring in Europe by Satellite SAR

    NARCIS (Netherlands)

    Smith, A.J.E.

    2002-01-01

    At present, gas pipeline networks in Europe are routinely monitored by vehicle and air patrols to protect them against damage by soil movement and third part interference. Because of the expenses, pipeline operators are investigating the possibilities to replace these traditional monitoring methods

  1. The Admission and Academic Placement of Students from Selected South American Countries: Bolivia, Brazil, Paraguay, Uruguay. A Workshop Report, September-October, 1977.

    Science.gov (United States)

    Aldrich-Langen, Caroline, Ed.

    Information about the educational systems of Bolivia, Brazil, Paraguay, and Uruguay that may be helpful to U.S. college admission officers is presented. For each of the four countries, information is provided on: country facts, the educational system, primary and secondary education, higher education, other institutions, placement recommendations,…

  2. Hot continent: South America is open for fast growth in the natural gas sector

    International Nuclear Information System (INIS)

    Opportunities for participation in the rapid expansion of the natural gas sector in South America following privatization and deregulation initiatives, were examined on a country-by-country basis. In Colombia and Venezuela opportunities exist primarily in domestic development of the gas sector, whereas in the countries of the southern cone - Argentina, Bolivia, Brazil, Chile, Paraguay, Peru and Uruguay - the situation is said to be ripe for energy sector integration. Currently, a second regional pipeline link, with a capacity of 129 Bcf/year, is nearing completion, which will carry gas from west Argentina to Santiago, Chile, to supplement the 77 Bcf/year pipeline carrying gas from Bolivia to the Argentine border, where it connects with a trunk line to supply the Buenos Aires market. A Canadian Energy Research Institute study, to be published in the summer of 1997, focuses on the various pipeline links being put forward to integrate the gas resources in the southern cone with existing and potential gas markets. The integration scenarios examined are predicted to reveal both economic and commercial merit for the pipeline corridors. Canadian energy and pipeline companies are said to be well positioned to take advantage of the opportunities resulting from these initiatives, and to help making the vision of an integrated gas pipeline network in the southern cone of South America a reality

  3. Gas Pipelines, LP and LNG, Published in unknown, DCP Midstream.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Gas Pipelines, LP and LNG dataset, was produced all or in part from Field Survey/GPS information as of unknown. Data by this publisher are often provided in...

  4. 78 FR 53190 - Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on...

    Science.gov (United States)

    2013-08-28

    ... Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal AGENCY: Pipeline... seal. Hazardous liquid and natural gas pipeline operators should ] verify if they have any TDW LRCs... and Flanged Fittings. These LRCs were manufactured for use on hazardous liquid and natural...

  5. 77 FR 58616 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-09-21

    ... Systems'' and the ``Incident Report--Natural and Other Gas Transmission and Gathering Pipeline Systems... Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems... Natural Gas Association of America (INGAA)--Trade Association (11) Northeast Gas Association...

  6. Gas pipeline optimization using adaptive algorithms

    Energy Technology Data Exchange (ETDEWEB)

    Smati, A.; Zemmour, N. [INH, Boumerdes (Algeria)

    1996-12-31

    Transmission gas pipeline network consume significant amounts of energy. Then, minimizing the energy requirements is a challenging task. Due to the nonlinearity and poor knowledge of the system states, several results, based on the optimal control theory, are obtained only for simple configurations. In this paper an optimization scheme in the face of varying demand is carried out. It is based on the use of a dynamic simulation program as a plant model and the Pareto set technique to sell out useful experiments. Experiments are used for the identification of regression models based on an original class of functions. The nonlinear programming algorithm results. Its connection with regression models permits the definition off-line, and for a long time horizon, of the optimal discharge pressure trajectory for all the compressor stations. The use of adaptive algorithms, with high frequency, permits one to cancel the effect of unknown disturbances and errors in demand forecasts. In this way, an on-line optimization scheme using data of SCADA system is presented.

  7. West-East Gas Pipeline Starts Trial Operation

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    @@ The eastern section of the West-East gas pipeline, which is from Jingbian County in Shaanxi Province to Shanghai, started trial operation on October 1, warming up for the commercial operation of the pipeline slated on January 1, 2004. PetroChina held a grand ceremony to celebrate the trial operation in Jingbian, a major gas production base of PetroChina Changqing Oil Field Company.

  8. Current Status and Prospects of Oil and Gas Pipelines in China

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ By the end of 2008,the total length of existing oil and gas pipelines in China had reached 6.3×104 km.These pipelines include 3.2×104 km of natural gas pipelines,1.8×104 km of crude oil pipelines and 1.3×104 km of oil products pipelines,laying the foundation for establishing a network of trans-regional oil and gas pipelines.

  9. A Low-Cost Natural Gas/Freshwater Aerial Pipeline

    CERN Document Server

    Bolonkin, A; Bolonkin, Alexander; Cathcart, Richard

    2007-01-01

    Offered is a new type of low-cost aerial pipeline for delivery of natural gas, an important industrial and residential fuel, and freshwater as well as other payloads over long distances. The offered pipeline dramatically decreases the construction and operation costs and the time necessary for pipeline construction. A dual-use type of freight pipeline can improve an arid rural environment landscape and provide a reliable energy supply for cities. Our aerial pipeline is a large, self-lofting flexible tube disposed at high altitude. Presently, the term "natural gas" lacks a precise technical definition, but the main components of natural gas are methane, which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg. The lightweight film flexible pipeline can be located in the Earth-atmosphere at high altitude and poses no threat to airplanes or the local environment. The authors also suggest using lift force of this pipeline in tandem with wing devices for che...

  10. Current State and Prospect of China's Oil and Gas Pipeline Deveopment

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    By the end of 2010, China has completed 85,000 kilometers of oil and gas pipelines in length, of which natural gas pipelines were 45,000 kilometers, crude oil pipelines were 22,000 kilometers, and products pipelines were 18,000 kilometers. An oil and gas

  11. THE SELECTION OF GAS PIPELINE ROUTE ON THE PLAN OF GAS SUPPLIED AREA

    Directory of Open Access Journals (Sweden)

    O. N. Medvedevа

    2011-07-01

    Full Text Available Problem statement. Selection of gas pipeline route exercises significant influence on the func-tioning of gas distribution system. The optimal solution of this problem would substantially reduce costs for construction and operation of gas supply system.Results and conclusions. In this paper, we give some recommendations on design of branch gas pipelines to increase the effectiveness of their operation. The results of technical and economic studies of gas distribution systems are presented. To determine the optimal variant of the gas pipe-line, we designed software package which allows to optimize simultaneously the pressure distribu-tion over the gas network and geometrical parameters.

  12. Deliverability on the interstate natural gas pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Deliverability on the Interstate Natural Gas Pipeline System examines the capability of the national pipeline grid to transport natural gas to various US markets. The report quantifies the capacity levels and utilization rates of major interstate pipeline companies in 1996 and the changes since 1990, as well as changes in markets and end-use consumption patterns. It also discusses the effects of proposed capacity expansions on capacity levels. The report consists of five chapters, several appendices, and a glossary. Chapter 1 discusses some of the operational and regulatory features of the US interstate pipeline system and how they affect overall system design, system utilization, and capacity expansions. Chapter 2 looks at how the exploration, development, and production of natural gas within North America is linked to the national pipeline grid. Chapter 3 examines the capability of the interstate natural gas pipeline network to link production areas to market areas, on the basis of capacity and usage levels along 10 corridors. The chapter also examines capacity expansions that have occurred since 1990 along each corridor and the potential impact of proposed new capacity. Chapter 4 discusses the last step in the transportation chain, that is, deliverability to the ultimate end user. Flow patterns into and out of each market region are discussed, as well as the movement of natural gas between States in each region. Chapter 5 examines how shippers reserve interstate pipeline capacity in the current transportation marketplace and how pipeline companies are handling the secondary market for short-term unused capacity. Four appendices provide supporting data and additional detail on the methodology used to estimate capacity. 32 figs., 15 tabs.

  13. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)]. E-mail: vermajnu@gmail.com

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this

  14. Major gas projects in Latin America. Issues and perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Khelil, C. [World Bank (United States)

    1997-11-01

    The Latin American energy demand will reach 677 MTOE by 2010, a 50% increase over 1995. There will be a major shift towards use of natural gas in power generation. US 503 10{sup 9} Dollars will be required over 1995-2010 to discover and develop hydrocarbon reserves, build the pipeline system as well as generate and distribute electricity. US 19 10{sup 9} Dollars will be required for gas pipelines and LNG projects in the region. Improvements in the policy, legal and regulatory framework are required in many countries to attract the needed investments. Several major gas projects are being implemented or planned in the region: Colombia Enron-built pipeline, Peru Camisea project, Chile Nova gas pipeline from Argentina, the Bolivia-Brazil pipeline and others. The World Bank group has been assisting countries in developing a competitive business environment and can provide, when needed, comfort to lenders in project financing through a guarantee scheme in several large complex cross border projects. (au)

  15. Polish Standard of the Technical Safety of Transmission Gas Pipelines

    International Nuclear Information System (INIS)

    The document is presenting the idea of the CNGI Norm called The Polish Standard of the Technical Safety of Transmission Gas Pipelines and the way of using it by companies associated in the Chamber of the Natural Gas Industry in the business activity. It will be applied to improve the quality and reliability of gas transmission after full opening of Polish natural gas market. (author)

  16. China Greatly Benefits from the West-East Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    @@ Statistics of the relevant department of China show that the West-East Gas Pipeline has boosted the rate of natural gas in China's primary energy mix from 2.2% to 3%, thus improving the safety of China's energy supply.

  17. Statistics of interstate natural gas pipeline companies, 1991

    International Nuclear Information System (INIS)

    This report, presents financial and operating information of all major interstate natural gas pipeline companies that operated in the United States during 1991. This report is used by the Federal Energy Regulatory Commission (FERC), State utility commissions, other government agencies, and the general public. The information is taken from FERC Form 2, ''Annual Report of Major Natural Gas Companies,'' as filed with FERC

  18. City gates: commissioning and start-up; Comissionamento e pre-operacao de estacoes de entrega de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Tavares, Cipriano Homem; Roz, Fabio da; Batista Filho, Jaire Medeiro; Pinto, Jose Eduardo Christovao [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Owner and sole operator in Brasilian territory of the Bolivia-Brazil Gas Pipeline (GASBOL), the largest of its kind in South America, TBG started operations on July 1 st, 1999. Since then, it has ensured transportation of Bolivian natural gas into Brazil swiftly and safely. This paper relates the TBG experiences on Natural Gas City Gates commissioning and pre-operation. It describes the maintenance and operation vision from the phases of the implementation project since the documents analysis and going through the risks analysis, works permissions, area liberation to gasification, calibration, and equipment adjusts. The special conditions related to the beginning of operation is also described: Consumption bellow the City Gate specification and relationship with the distribution concessionaire. (author)

  19. Regulatory reform for natural gas pipelines: The effect on pipeline and distribution company share prices

    Science.gov (United States)

    Jurman, Elisabeth Antonie

    1997-08-01

    The natural gas shortages in the 1970s focused considerable attention on the federal government's role in altering energy consumption. For the natural gas industry these shortages eventually led to the passage of the Natural Gas Policy Act (NGPA) in 1978 as part of the National Energy Plan. A series of events in the decade of the 1980s has brought about the restructuring of interstate natural gas pipelines which have been transformed by regulators and the courts from monopolies into competitive entities. This transformation also changed their relationship with their downstream customers, the LDCs, who no longer had to deal with pipelines as the only merchants of gas. Regulatory reform made it possible for LDCs to buy directly from producers using the pipelines only for delivery of their purchases. This study tests for the existence of monopoly rents by analyzing the daily returns of natural gas pipeline and utility industry stock price data from 1982 to 1990, a period of regulatory reform for the natural gas industry. The study's main objective is to investigate the degree of empirical support for claims that regulatory reforms increase profits in the affected industry, as the normative theory of regulation expects, or decrease profits, as advocates of the positive theory of regulation believe. I also test Norton's theory of risk which predicts that systematic risk will increase for firms undergoing deregulation. Based on a sample of twelve natural gas pipelines, and 25 utilities an event study concept was employed to measure the impact of regulatory event announcements on daily natural gas pipeline or utility industry stock price data using a market model regression equation. The results of this study provide some evidence that regulatory reforms did not increase the profits of pipeline firms, confirming the expectations of those who claim that excess profits result from regulation and will disappear, once that protection is removed and the firms are operating in

  20. Research on airborne infrared leakage detection of natural gas pipeline

    Science.gov (United States)

    Tan, Dongjie; Xu, Bin; Xu, Xu; Wang, Hongchao; Yu, Dongliang; Tian, Shengjie

    2011-12-01

    An airborne laser remote sensing technology is proposed to detect natural gas pipeline leakage in helicopter which carrying a detector, and the detector can detect a high spatial resolution of trace of methane on the ground. The principle of the airborne laser remote sensing system is based on tunable diode laser absorption spectroscopy (TDLAS). The system consists of an optical unit containing the laser, camera, helicopter mount, electronic unit with DGPS antenna, a notebook computer and a pilot monitor. And the system is mounted on a helicopter. The principle and the architecture of the airborne laser remote sensing system are presented. Field test experiments are carried out on West-East Natural Gas Pipeline of China, and the results show that airborne detection method is suitable for detecting gas leak of pipeline on plain, desert, hills but unfit for the area with large altitude diversification.

  1. 75 FR 72877 - Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements

    Science.gov (United States)

    2010-11-26

    ... . SUPPLEMENTARY INFORMATION: I. Background On July 2, 2009, (74 FR 31675) PHMSA published a Notice of Proposed... distribution and hazardous liquid pipelines (August 17, 2009; 74 FR 41496). The use of these new forms were... that ignites a gas relief vent that is designed to close and snuff out the resulting fire with...

  2. Design for internal corrosion resistance of sales gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Kolts, Juri [ConocoPhillips, Bartlesville, OK (United States)

    2004-07-01

    Three aspects of internal corrosion of sales gas pipelines are discussed, especially for use during the design phases of a project. These include corrosion by salts at water contents less than saturation, corrosion by glycol solutions at water contents less than saturation, and by short term wetting of the pipeline by upsets or commissioning. Water salt, but especially sea-salt, promotes corrosion of pipeline steel at water contents significantly less than saturation. At relative humidity between 23 and 100%, sea-salt absorbs water from 'dry' gas and promotes corrosion. The corrosion rate increases with increasing relative humidity. The corrosion measured in the laboratory is low, but can be significant for pipelines with a long design life. One method of reducing likelihood of such corrosion is by specifying clean water slugs after hydro-testing. Corrosion by glycol/water mixtures has been well investigated by the industry. This paper describes the corrosion in humid environments. The glycol concentration remains in equilibrium with the gas phase, thus the water/glycol ratio in a pipeline varies with temperature and pressure. The corrosion rate increases with decreasing temperature, because the greater water dilution of glycol with decreasing temperature overcomes the increasing corrosion rate from elevating temperature. Short-term exposure of internal pipeline surfaces can occur during upsets or from certain aspects of commissioning. The duration of exposure in wet environments can be estimated, sometimes, by measuring the degree of water saturation in pipeline gas. At low temperatures, iron supersaturation can play an important role in reducing corrosion after water exposure under stagnant conditions. (author)

  3. Real gas flow simulation in damaged distribution pipelines

    International Nuclear Information System (INIS)

    The paper discusses chosen issues concerning damaged gas pipelines. Attention is paid to modelling the steady-state flow of natural gas in distribution pipelines, and the most commonly applied models of isothermal and adiabatic flow are evaluated for both the ideal and the real gas properties. A method of accounting for a leakage by means of a reference flow equation with a discharge coefficient is presented, and the dependency of the discharge coefficient on pressure is demonstrated both with literature data and the authors' experimental results. A relevant computational study of a pipeline failure is presented for a high- and a medium pressure pipeline. The importance of an appropriate choice of the flow model (isothermal or adiabatic flow of real or ideal gas) is demonstrated by the results of the study. It is shown that accounting for the variability of the discharge coefficient is required if medium pressure pipelines are analysed. However, it is eventually shown that the impact of the discharge coefficient on the predicted outflow rate is of lesser importance than that of the applied flow model. -- Highlights: ► Comparison of real/ideal gas, isothermal/adiabatic gas flow in a damaged pipeline. ► Variability of the discharge coefficient with pressure is demonstrated. ► Isothermal model predicts wrong values of downstream pressure, not just temperature. ► Isothermal model may cause significant error (for 2 case studies is >20%). ► Error in the discharge coefficient has a weak influence on the predicted flow rate.

  4. Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W.; Antonia, O.; Penev, M.

    2013-03-01

    The United States has 11 distinct natural gas pipeline corridors: five originate in the Southwest, four deliver natural gas from Canada, and two extend from the Rocky Mountain region. This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipelines.

  5. Interaction between soils and gas pipelines

    Science.gov (United States)

    Karpachevskii, L. O.; Goroshevskii, A. V.; Zubkova, T. A.

    2011-03-01

    The interaction between pipelines and soils manifests itself in the soil disturbance in the course of the pipe installation, in the transformation of the water and temperature regimes in the trenches, and in the appearance of corrosion and cracks on the pipe walls. The more contrasting the soil water regime in the pipe-adjacent sections of the trench, the greater the amount of the pipe damage. The damage of the pipe insulation activates the pipe corrosion. The emission of gases (H2S, CH4, CO2, CO, and H2) and the activity of sulfate-reducing bacteria are the main causes of the pipes' destruction. The humus content and the redox potential decrease, and the soil density and concentrations of ferrous compounds increase in the soils of the trench zone. Accidents along pipelines occur most often in the area of serozems and chestnut soils, and this is related to the salinization in the lower soil horizons and to the contrasting soil water regime near the pipe. The number of accidents along the pipelines installed into soddy-podzolic soils is lower.

  6. 78 FR 70163 - Communication of Operational Information between Natural Gas Pipelines and Electric Transmission...

    Science.gov (United States)

    2013-11-22

    ...\\ The Commission recognizes that some vertically-integrated transmission operators may have marketing... 284 Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission... Communication of Operational Information between Natural Gas Pipelines and Electric Transmission...

  7. Development Of A Centrifugal Hydrogen Pipeline Gas Compressor

    Energy Technology Data Exchange (ETDEWEB)

    Di Bella, Francis A. [Concepts NREC, White River Junction, VY (United States)

    2015-04-16

    Concepts NREC (CN) has completed a Department of Energy (DOE) sponsored project to analyze, design, and fabricate a pipeline capacity hydrogen compressor. The pipeline compressor is a critical component in the DOE strategy to provide sufficient quantities of hydrogen to support the expected shift in transportation fuels from liquid and natural gas to hydrogen. The hydrogen would be generated by renewable energy (solar, wind, and perhaps even tidal or ocean), and would be electrolyzed from water. The hydrogen would then be transported to the population centers in the U.S., where fuel-cell vehicles are expected to become popular and necessary to relieve dependency on fossil fuels. The specifications for the required pipeline hydrogen compressor indicates a need for a small package that is efficient, less costly, and more reliable than what is available in the form of a multi-cylinder, reciprocating (positive displacement) compressor for compressing hydrogen in the gas industry.

  8. Numerical Recovery of Gas Flows in Pipeline Systems

    Directory of Open Access Journals (Sweden)

    Vadim E. Seleznev

    2012-01-01

    Full Text Available Optimal control, prevention and investigation of accidents, and detection of discrepancies in estimated gas supply and distribution volumes are relevant problems of trunkline operation. Efficient dealing with these production tasks is based on the numerical recovery of spacetime distribution of nonisothermal transient flow parameters of transmitted gas mixtures based on full-scale measurements in a substantially limited number of localities spaced considerable distances apart along the gas pipelines. The paper describes a practical method of such recovery by defining and solving a special identification problem. Simulations of product flow parameters in extended branched pipelines, involving calculations of the target function and constraint function for the identification problem of interest, are done in the 1D statement. In conclusion, results of practical application of the method in the gas industry are briefly discussed.

  9. Simulation of non-isothermal transient flow in gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira Junior, Luis Carlos; Soares, Matheus; Lima, Enrique Luis; Pinto, Jose Carlos [Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Quimica; Muniz, Cyro; Pires, Clarissa Cortes; Rochocz, Geraldo [ChemTech, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Modeling of gas pipeline usually considers that the gas flow is isothermal (or adiabatic) and that pressure changes occur instantaneously (quasi steady state approach). However, these assumptions are not valid in many important transient applications (changes of inlet and outlet flows/pressures, starting and stopping of compressors, changes of controller set points, among others). Besides, the gas properties are likely to depend simultaneously on the pipe position and on the operation time. For this reason, a mathematical model is presented and implemented in this paper in order to describe the gas flow in pipeline when pressure and temperature transients cannot be neglected. The model is used afterwards as a tool for reconciliation of available measured data. (author)

  10. Blending Hydrogen into Natural Gas Pipeline Networks. A Review of Key Issues

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Antonia, O. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-03-01

    This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipelines. Blending hydrogen into the existing natural gas pipeline network has also been proposed as a means of increasing the output of renewable energy systems such as large wind farms.

  11. 77 FR 65508 - Annual Charge Filing Procedures for Natural Gas Pipelines

    Science.gov (United States)

    2012-10-29

    ... Energy Regulatory Commission 18 CFR Part 154 Annual Charge Filing Procedures for Natural Gas Pipelines... filing requirements for natural gas pipelines that choose to recover Commission-assessed annual charges through an annual charge adjustment (ACA) clause. Currently, natural gas pipelines utilizing an ACA...

  12. 78 FR 18968 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2013-03-28

    ... Energy Regulatory Commission Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on March 8, 2013, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, 7th... directed to Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of America LLC, 3250 Lacey...

  13. 76 FR 4516 - Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines

    Science.gov (United States)

    2011-01-26

    ... Reporting Requirements for Natural Gas Pipelines, Order No. 710, 73 FR 19389 (Apr. 10, 2008), FERC Stats... Reporting Requirements for Natural Gas Pipelines, Notice of Proposed Rulemaking, 75 FR 35700 (June 23, 2010... for Natural Gas Pipeline, Notice of Proposed Rulemaking, 72 FR 54860 (Sept. 27, 2007), FERC...

  14. Application of Dry Air Drying Techniques on West-East Gas Pipeline Project

    Institute of Scientific and Technical Information of China (English)

    GaoJianguo; XieLigong; DaiZongyu

    2004-01-01

    Based on the pre-eommissioning requirements of gas pipeline, the basic principles and influential factors of dry air drying adopted in long distance gas pipelines, and states in detail the technological flow and the equipment required, etc. are introduced, which will have practical significance in drying operation on gas pipeline.

  15. Upgrading Algeria-Italy trans-Mediterranean natural gas pipeline

    International Nuclear Information System (INIS)

    The first trans-Mediterranean pipeline system, which went into service in 1983, had to be doubled in capacity in order to meet increased European demand for Algerian natural gas. After a brief review of the contractual, planning and construction history of the first pipeline, this paper discusses the strategies taken which led to the decision to double the line's capacity. Descriptions are then given of the different construction phases realized in Tunisia, the Sicilian Channel and Italian mainland. Focus is on construction schedules, problems and solutions. The report comes complete with details of project financing, organizing, materials supply programs, innovative technology applications, design philosophy and construction techniques

  16. Satellite Radar Interferometry For Risk Management Of Gas Pipeline Networks

    Science.gov (United States)

    Ianoschi, Raluca; Schouten, Mathijs; Bas Leezenberg, Pieter; Dheenathayalan, Prabu; Hanssen, Ramon

    2013-12-01

    InSAR time series analyses can be fine-tuned for specific applications, yielding a potential increase in benchmark density, precision and reliability. Here we demonstrate the algorithms developed for gas pipeline monitoring, enabling operators to precisely pinpoint unstable locations. This helps asset management in planning, prioritizing and focusing in-situ inspections, thus reducing maintenance costs. In unconsolidated Quaternary soils, ground settlement contributes to possible failure of brittle cast iron gas pipes and their connections to houses. Other risk factors include the age and material of the pipe. The soil dynamics have led to a catastrophic explosion in the city of Amsterdam, which triggered an increased awareness for the significance of this problem. As the extent of the networks can be very wide, InSAR is shown to be a valuable source of information for identifying the hazard regions. We monitor subsidence affecting an urban gas transportation network in the Netherlands using both medium and high resolution SAR data. Results for the 2003-2010 period provide clear insights on the differential subsidence rates in the area. This enables characterization of underground motion that affects the integrity of the pipeline. High resolution SAR data add extra detail of door-to-door pipeline connections, which are vulnerable due to different settlements between house connections and main pipelines. The rates which we measure represent important input in planning of maintenance works. Managers can decide the priority and timing for inspecting the pipelines. The service helps manage the risk and reduce operational cost in gas transportation networks.

  17. Engineering considerations for corrosion monitoring of gas gathering pipeline systems

    Energy Technology Data Exchange (ETDEWEB)

    Braga, T.G.; Asperger, R.G.

    1987-01-01

    Proper corrosion monitoring of gas gathering pipelines requires a system review to determine the appropriate monitor locations and types of monitoring techniques. This paper develops and discusses a classification of conditions such as flow regime and gas composition. Also discussed are junction categories which, for corrosion monitoring, need to be considered from two points of view. The first is related to fluid flow in the line and the second is related corrosion inhibitor movement along the pipeline. The appropriate application of the various monitoring techniques such as coupons, hydrogen detectors, electrical resistance probe and linear polarization probes are discussed in relation to flow regime and gas composition. Problems caused by semi-conduction from iron sulfide are considered. Advantages and disadvantages of fluid gathering methods such as pots and flow-through drips are discussed in relation to their reliability as on-line monitoring locations.

  18. Safety distance between underground natural gas and water pipeline facilities

    International Nuclear Information System (INIS)

    A leaking water pipe bursting high pressure water jet in the soil will create slurry erosion which will eventually erode the adjacent natural gas pipe, thus causing its failure. The standard 300 mm safety distance used to place natural gas pipe away from water pipeline facilities needs to be reviewed to consider accidental damage and provide safety cushion to the natural gas pipe. This paper presents a study on underground natural gas pipeline safety distance via experimental and numerical approaches. The pressure–distance characteristic curve obtained from this experimental study showed that the pressure was inversely proportional to the square of the separation distance. Experimental testing using water-to-water pipeline system environment was used to represent the worst case environment, and could be used as a guide to estimate appropriate safety distance. Dynamic pressures obtained from the experimental measurement and simulation prediction mutually agreed along the high-pressure water jetting path. From the experimental and simulation exercises, zero effect distance for water-to-water medium was obtained at an estimated horizontal distance at a minimum of 1500 mm, while for the water-to-sand medium, the distance was estimated at a minimum of 1200 mm. - Highlights: • Safe separation distance of underground natural gas pipes was determined. • Pressure curve is inversely proportional to separation distance. • Water-to-water system represents the worst case environment. • Measured dynamic pressures mutually agreed with simulation results. • Safe separation distance of more than 1200 mm should be applied

  19. In Fair Weather Prepare for Foul ---In-service integrity inspection of oil/gas pipeline

    Institute of Scientific and Technical Information of China (English)

    ZhangZhaotian; XiongXiaoyun

    2003-01-01

    Pipeline transportation is one of the major ways for the oil/gas transmission. To ensure the safety of oil/gas transmission pipeline is very important because of its primary role in national economic development and people' s life quality improvement. In China, 20 000km of oil/gas pipelines are at work and 10 000km pipelines are being or will be constructed.

  20. Experimental Study of Surface Detection of Gas Pipeline Buried in Soil

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    Pipeline is a key segment in the transportation of city gas and its safety affects the safety of industrial and domestic application. The characteristics of Shi Dongkou east gas steel pipeline buried in soil were discussed and its parameters related to safety were measured, including the state of anticorrosive layer, the soil resistivity,the natural potential and the protective potential of gas pipeline. The experimental results were confirmed by excavating, which are of value to the knowledge of the gas pipeline buried in soil in Shanghai. The experimental data were analyzed which provide the scientific basis for the assurance of the gas pipeline safety and the reparation of anticorrosivelayer.

  1. Economics of LNG and pipeline gas export from GC C

    International Nuclear Information System (INIS)

    This paper briefly reviews the economic and non-economic considerations underlying gas exports from the GC C and the Arabian Peninsula in general. It addresses four themes: policy issues, political risks, technical risks and economics. It examines the distance between the regional resource areas and the major gas markets in the Far East and Europe, and examines the implications for moving gas to those markets in liquid form or by pipeline, in terms of number of LNG vessels required, and capital costs. (Author)

  2. Programs of environmental administration of GASBOL and its results; Programas de gestao ambiental do GasBol e seus resultados

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Helio Joaquim dos; Figliuolo, Marilu [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    One of the largest South America's enterprises of energy integration of the Bolivia/Brazil gas pipeline in Brazilian side, owned and operated by TBG, has interacted with 05 states, 137 districts and 06 environment governmental entities (Environmental and States department) of environment multilateral financial institutions and group of ten of other governmental and not governmental organizations. As a result of the Environmental Impact Studies and Environmental Impact Reports (EIA/RIMA) required for the project implementation, was developed an Environmental Management Plan - EMP, which addressed the following compensation plans: Socio - Economic Compensation Plan, Indigenous Peoples Development Plan - PDI and Ecological Compensation Plan. This report presents a summary of the compensation plans, the criteria utilized for the projects determination and the evaluation of the results, after 6 years, according to the established targets. (author)

  3. A comparison of natural gas pipeline options for the North

    International Nuclear Information System (INIS)

    High prices and high demand for natural gas in the North American market, combined with a more positive investment climate, have renewed interest in the development of natural gas reserves in the Mackenzie Delta region of the Northwest Territories and Prudhoe Bay in Alaska. A prerequisite to developing these resources is construction of a pipeline. This report describes the results of an analysis of five of the six pipeline options which have been considered in recent years. The options considered are: (1) Mackenzie Valley Stand Alone, (2) a combination onshore Alaska North Slope with Mackenzie Valley, (3) a combination offshore Alaska North Slope with Mackenzie Valley, (4) the Alaska Natural Gas Transmission System (ANGTS) and (5) a combination of ANGTS and Dempster Lateral. The Mackenzie Valley with the Prudhoe Bay Onshore route was not included because benefits and costs are considered to be very similar to those of the Mackenzie Valley with Prudhoe Bay Offshore route. Both these would connect Alaska gas with gas from the Mackenzie Delta and ship both down the Mackenzie Valley. The report presents results of an analysis which focused on capital costs, employment and fiscal benefits to the Northwest Territories, employment and fiscal benefits to Canada, pipeline tolls and producer revenues. Results show that both the Northwest Territories and Canada as a whole would benefit most from a Mackenzie Valley and Offshore Prudhoe Bay Pipeline route because economic, employment and fiscal impacts are the highest. Tolls are also projected to be the lowest with this option; this would result in higher revenues to producers. Although all routes have the potential to affect the geology, hydrology, climate and biological aspects of the areas surrounding them, the environmental impacts for all routes appear to be moderate for the construction phase and low to negligible for the operation. Environmental implications are discussed in detail in Appendix B. 25 refs., 43 tabs., 9

  4. 78 FR 44900 - Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission...

    Science.gov (United States)

    2013-07-25

    ... natural gas pipelines for the purpose of promoting reliable service or operational planning is reasonable... flow rates.'' \\40\\ In addition, this standard ensures that natural gas pipelines have relevant planning information to assist in maintaining the operational integrity and reliability of pipeline service, as well...

  5. Foam for Flow Assurance in Gas-Condensate Pipelines

    OpenAIRE

    Karam, Thereza

    2013-01-01

    Use of foam in the oil industry is employed for lifting cuttings in drilling operations, for removal of liquid loading in vertical wells and for increasing oil recovery. Limited researches discussed the foam applicability as a flow assurance practice. This study is an initial attempt to investigate the possibility of using foam to remove or reduce liquid accumulations in horizontal gas-condensate pipelines. The different rheological models of foam had been examined along with the correspondin...

  6. 75 FR 16337 - Standards for Business Practices for Interstate Natural Gas Pipelines

    Science.gov (United States)

    2010-04-01

    ... natural gas pipeline business practices and electronic communications to incorporate by reference into its... Standards Board (NAESB). This rule upgrades the Commission's current business practice and communication... regulations to standardize the business practices and communication methodologies of interstate pipelines...

  7. Market brief : the oil and gas market in Bolivia

    International Nuclear Information System (INIS)

    This report presents a market overview of the oil and gas sector in Bolivia and describes the potential for Canadian suppliers to enter into joint ventures to establish local production facilities and transfer technology expertise. Bolivia has an estimated 54.9 trillion cubic feet of natural gas reserves and 440.5 million barrels of proven oil reserves. The main hope for future economic growth in Bolivia hinges on increasing natural gas exports. Opportunities for Canadian companies exist in exploration, production and pipeline construction. There is also a demand for drilling machinery equipment, pipeline components and services for the expansion of the proposed Bolivia-Brazil pipeline. The largest energy company in Bolivia is Repsol YPF which operates through its subsidiary Empress Petrolera Andina. The largest end-users of oil and gas equipment and services include domestic upstream operators and international oil majors and international exploration and production companies. This report describes the key factors shaping market growth along with the competitive environment, local capabilities, international competition and the Canadian position. Considerations for market-entry in Bolivia were also outlined

  8. MODELING AND AVAILABILITY ANALYZES OF A COMPLEX GAS PIPELINE NETWORK

    Energy Technology Data Exchange (ETDEWEB)

    Ainouche, A.; Ainouche, H.

    2007-07-01

    The network reliability, in the way of security of supply of international markets, is proved to be an essential criterion for the conservation of the market shares and the conquest of new customers. In relation with the importance and the existing configurations diversity of gas pipelines networks, the obtaining of a global availability model of a network is difficult to implement by the use of a classic approach based on the analysis of the whole of failure risks, the definition of their probability and the estimation of their impact in term of productivity. This because mainly of the huge dimensions of the phase space that would result from such a conception. To get round this problem we implemented a systemic type approach for the modeling of the availability of a complex gas pipelines network. The approach of modeling is of 'bottom-up' type. The model of coordination is a model of flow maximization whose formalization requires the representation of the gas pipeline network by the graphs theory. The developed tool can also be used as a stand of experimentation and to define by simulation the impact of every decision having the tendency to improve the availability of the network. (auth)

  9. CHARACTERIZATION OF EXTERNAL INDUCED CORROSION DEGRADATION OF AJAOKUTA-ABUJA GAS PIPELINE SYSTEM, NIGERIA

    OpenAIRE

    ADEDIPE OYEWOLE

    2011-01-01

    Characterization of External Induced corrosion degradation of Ajaokuta- Abuja gas pipeline system was successfully carried out. The objective of this work is to analyze the mechanism of corrosion, analyze the effect of the corrosion on oil and gas pipeline and to evaluate the corrosion potential of a pipeline route. These were achieved by carrying out resistivity experiment on every one kilometer on the right of way (ROW) of the pipeline. Soil and water aggressiveness test was also carried ou...

  10. Essays on the economics of natural gas pipelines

    Science.gov (United States)

    Oliver, Matthew E.

    The natural gas pipeline transportation industry is comprised of a primary market and a secondary market. In the primary market, pipelines sell 'firm' transport capacity contracts to gas traders, local distribution companies, and other parties. The (per unit) secondary market value of transport is rarely comparable to the regulated primary market two-part tariff. When and where available capacity in the secondary market is scarce, its value can far exceed the primary market tariffs paid by firm contract holders, generating scarcity rents. The following essays demonstrate that this phenomenon has predictable effects on natural gas spot prices, firm capacity reservations, the pipeline's capacity construction and expansion decisions, and the economic welfare of producers and consumers at the market hubs connected by the pipeline. Chapter 1 provides a theoretical framework for understanding how pipeline congestion affects natural gas spot prices within the context of the current regulatory environment, and empirically quantifies this effect over a specific regional pipeline network. As available pipeline capacity over a given route connecting two hubs becomes scarce, the spot prices for gas at the hubs are driven apart---a phenomenon indicative of some market friction that inhibits the ability of spot price arbitrage to fully integrate the two prices, undermining economic efficiency. The theoretical component of Chapter 1 illuminates a potential source of this friction: the deregulated structure of the secondary market for gas transportation services. To support and quantify the predictions of the theoretical model, the empirical component demonstrates that the effect of congestion on the secondary market value of transport---the key factor in driving apart spot prices---can be quite strong. Coefficient estimates indicate that dramatic increases in transport costs are likely to result from marginal increases in congestion. This result has important implications because

  11. The research on natural gas pipeline transportation price formulation method

    Directory of Open Access Journals (Sweden)

    YU Wenjia

    2014-02-01

    Full Text Available This paper will introduce a method of natural gas pipeline transportation price on the basis of two-part tariff.Distance,investment and income have been taken into consideration.The total fee is divided into three parts:reservation fee,usage fee and peak-load regulation fee.Because there are different types of users in the natural gas market who show great difference in the continuity and reliability of gas supply,capacity of bearing price,elastic demand and balance use of gas,according to the method,the different types of users can pay reasonable fee.This method not only considers the investment income recovery but also considers the different types of users paying a reasonable fee.We hope the new pricing model can give a reference to the development of China's natural gas industry.

  12. 75 FR 51031 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2010-08-18

    ... Energy Regulatory Commission Natural Gas Pipeline Company of America LLC; Notice of Application August 12, 2010. Take notice that on July 30, 2010, Natural Gas Pipeline Company of America LLC (Natural Gas...), and sections 157.7 and 157.18 of the Commission's regulations under the Natural Gas Act (NGA)...

  13. Remote laser detection of natural gas leakages from pipelines

    International Nuclear Information System (INIS)

    A differential absorption lidar based on a tunable TEA CO2 laser emitting at 42 lines of the 'hot' 0111 - 1110 band in the range from 10.9 to 11.4 μm is developed for detecting natural gas leakages from oil pipelines by measuring the ethane content in the atmosphere. The ethane detection sensitivity is 0.9 ppm km. The presence of methane does not distort the measurement results. The developed lidar can detect the natural gas leakage from kilometre heights at the flying velocities up to 200 km h-1 and a probe pulse repetition rate of 5 Hz. (laser applications and other topics in quantum electronics)

  14. Dynamical Mechanisms of Effects of Landslides on Long Distance Oil and Gas Pipelines

    Institute of Scientific and Technical Information of China (English)

    MA Qingwen; WANG Chenghua; KONG Jiming

    2006-01-01

    According to the investigations on the oil and gas pipelines such as the Lan-Cheng-Chong pipeline and the Southwest pipeline, there are two ways of laying pipeline: pipelines paralleling (approximately) to the main slide direction and pipelines perpendicular (approximately) to the main slide direction. If earth-retaining walls have been built for pipelines paralleling to the main slide direction, they will prevent the lands from sliding; On the contrary, without earth-retaining walls, the sharp broken rocks in the backfilling soil will scratch the safeguard of the pipeline when the landslides take place. Pipelines perpendicular to the main slide direction can be classified into four types according to the relative positions between pipelines and landslides: Pipelines over the slide planes, pipelines inside the fracture strips of slide planes, pipelines below the slide planes and pipelines behind the backsides of landslides. The different dynamical mechanisms of the process in which landslide acts against pipelines are analyzed based on whether the pipelines are equipped with fixed frusta, because the sliding resistance depends on whether and how many fixed frusta are equipped and the distance between frusta.

  15. Practical approach on gas pipeline compression system availability analysis

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney Pereira dos [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Kurz, Rainer; Lubomirsky, Matvey [Solar Turbines, San Diego, CA (United States)

    2009-12-19

    Gas pipeline projects traditionally have been designed based on load factor and steady state flow. This approach exposes project sponsors to project sustainability risks due to potential losses of revenues and transportation contract penalties related to pipeline capacity shortage as consequence of compressor unit's unavailability. Such unavailability should previously be quantified during the design phase. This paper presents a case study and a methodology that highlights the practical benefits of applying Monte Carlo simulation for the compression system availability analysis in conjunction with quantitative risk analysis and economic feasibility study. Project economics main variables and their impacts on the project NPV (Net Present Value) are evaluated with their respective statistics distribution to quantify risk and support decision makers to adopt mitigating measures to guarantee competitiveness while protecting project sponsors from otherwise unpredictable risks. This practical approach is compared to load factor approach and the results are presented and evaluated. (author)

  16. Leak in spiral weld in a 16 inches gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Fazzini, Pablo G.; Bona, Jeremias de [GIE S.A., Mar del Plata (Argentina); Otegui, Jose L. [University of Mar del Plata (Argentina)

    2009-07-01

    This paper discusses a failure analysis after a leak in the spiral weld of a 16 inches natural gas pipeline, in service since 1974. The leak was the result of the coalescence of two different defects, on each surface of the pipe wall, located in the center of the inner cord of the helical DSAW weld. Fractographic and metallographic studies revealed that the leak was a combination of three conditions. During fabrication of the pipe, segregation in grain boundary grouped in mid weld. During service, these segregations underwent a process of selective galvanic corrosion. One of these volumetric defects coincided with a tubular pore in the outer weld. Pigging of the pipeline in 2005 for cleaning likely contributed to the increase of the leak flow, when eliminating corrosion product plugs. Although these defects are likely to repeat, fracture mechanics shows that a defect of this type is unlikely to cause a blowout. (author)

  17. Field validation of a dynamic model for an MFL ILI tool in gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Botros, K. K. [Nova Chemical Research and Technology Centre, Calgary, Alberta, (Canada); Golshan, H. [TransCanada Pipelines Ltd, Calgary, Alberta, (Canada)

    2010-07-01

    The pipeline industry uses pigs for numerous operations such as dewatering, cleaning and inspection. Pigs used on gas pipelines are subject to stringent parameters. For example, the inclination in the section of the pipeline affects driving pressure and velocity. The study investigated the behaviour and performance of pigs in gas pipelines. A dynamic model was developed for the movement of pigs in an inclined pipeline section, taking into consideration the effects of gas properties, wall friction, by-pass flow for speed control, differential pressure across the pig, seal efficiency and gap flows. Field data from pigging a 158 km NPS 18 gas pipeline on TransCanada's pipeline system in Alberta are used for field validation of the model. It is found that the developed model is stable. The comparison between field data and model results demonstrated the accuracy of the model, within +/- 8% of St. Deviation.

  18. Electricity and gas regulation in Latin America

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, Peter N.

    1998-08-01

    Contains Executive Summary and Chapters on: Background Information; The Electricity Chain; The Gas Chain; The Regulatory Structure; International Activity; Argentina; Bolivia; Brazil; Chile; Colombia; Mexico; Peru; Venezuela; Central America; Other Latin American Markets; Non-Latin America Markets; The Caribbean. (Author)

  19. GASDUC-3: a gas pipeline with neutralization of greenhouse gases

    Energy Technology Data Exchange (ETDEWEB)

    D' Oliveira, Celso A.; Paula, Eliane H. de; Freire, Dilian A.D. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    PETROBRAS seeks to develop its projects following the contemporary premises of sustainable development. The Cabiunas-REDUC-3 Gas Pipeline (GASDUC-3), an undertaking from the Transportadora Associada de Gas - TAG (Associated Gas Transporter) in progress by PETROBRAS, is an example showing that interfacing with the environment can overcome legal questions to reach the realm of awareness and community spirit. In addition to the many programs directed specifically towards the fulfillment of environmental regulations, as defined by competent agencies, the GASDUC-3 is also inserted in the Carbon Free Program. In the Carbon Free Program, all the GHG emissions into the atmosphere during the construction of the gas pipeline will be compensated for with the neutralization of carbon through reforestation. Such initiative is considered unheard of in works with pipelines worldwide. An inventory that quantified the emission of GHG during the implementation of GASDUC-3 made it possible to quantify the reforestation to be implemented and to calculate the number of native species to be planted for absorption - during the course of their growth - of this same amount of carbon dioxide from the atmosphere. The trees are being planted especially in Permanent Preservation Areas (PPA), located in the Unidades de Conservacao do Bioma Mata Atlantica (Conservation Units of the Atlantic Forest Biome), inside the influence region of the gas pipeline, in accordance with the competent environmental agencies and owners. In this way, in addition to fixing carbon and contributing to the deceleration of global warming, the project also cooperates with the preservation of hydro and soil resources and the local and regional biodiversity. The recapturing of the already emitted GHG through reforestation faces bureaucratic and economic difficulties in order to be implemented, different from the emission reduction projects which are widely disseminated by means of Clean Development Mechanisms (CDM

  20. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits...) computes and publishes the project cost and annual limits for natural gas pipelines blanket construction... Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  1. 76 FR 62395 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2011-10-07

    ... Energy Regulatory Commission Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on September 20, 2011, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road... sections 7(b) and 7(c) of the Natural Gas Act (NGA), an application to abandon and construct...

  2. 75 FR 36376 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2010-06-25

    ... Federal Energy Regulatory Commission Natural Gas Pipeline Company of America LLC; Notice of Application June 17, 2010. Take notice that on June 8, 2010, Natural Gas Pipeline Company of America LLC (Natural..., pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA), an application to abandon two...

  3. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits...) computes and publishes the project cost and annual limits for natural gas pipelines blanket construction... practice and procedure, Natural Gas, Reporting and recordkeeping requirements. Jeff C. Wright,...

  4. 75 FR 35700 - Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines

    Science.gov (United States)

    2010-06-23

    ... for Natural Gas Pipelines June 17, 2010. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION... Natural Gas Pipelines, Order No. 710, FERC Stats. & Regs. ] 31,267 (2008), order on reh' g and... revised its financial forms, statements, and reports for natural gas companies, contained in FERC Form...

  5. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits... (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy...

  6. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits AGENCY... publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for... CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  7. 78 FR 67350 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2013-11-12

    ... Energy Regulatory Commission Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on October 18, 2013 Natural Gas Pipeline Company of America LLC (Natural), at 3250 Lacey Road... Natural Gas Act (NGA) and Part 157 of the Commission's regulations, for a certificate of...

  8. Numerical simulation of wall temperature on gas pipeline due to radiation of natural gas during combustion

    Directory of Open Access Journals (Sweden)

    Ilić Marko N.

    2012-01-01

    Full Text Available This paper presents one of the possible hazardous situations during transportation of gas through the international pipeline. It describes the case when at high-pressure gas pipeline, due to mechanical or chemical effect, cracks and a gas leakage appears and the gas is somehow triggered to burn. As a consequence of heat impingement on the pipe surface, change of material properties (decreasing of strength at high temperatures will occur. In order to avoid greater rapture a reasonable pressure relief rate needs to be applied. Standards in this particular domain of depressurizing procedure are not so exact (DIN EN ISO 23251; API 521. This paper was a part of the project to make initial contribution in defining the appropriate procedure of gas operator behaving during the rare gas leakage and burning situations on pipeline network. The main part of the work consists of two calculations. The first is the numerical simulation of heat radiation of combustible gas, which affects the pipeline, done in the FLUENT software. The second is the implementation of obtained results as a boundary condition in an additional calculation of time resolved wall temperature of the pipe under consideration this temperature depending on the incident flux as well as a number of other heat flow rates, using the Matlab. Simulations were done with the help of the “E.ON Ruhrgas AG” in Essen.

  9. Condition prediction models for oil and gas pipelines using regression analysis

    OpenAIRE

    El-Abbasy, M.; Senouci, A; Zayed, T.; Mirahadi, F.; Parvizsedghy, L.

    2014-01-01

    Although they are the safest means of transporting oil and gas products, pipelines can sometimes fail with hazardous consequences and large business losses. The decision to replace, repair, or rehabilitate depends mainly on the condition of the pipeline. Assessing and predicting its condition is therefore a key step in the maintenance plan of a pipeline. Several models have recently been developed to predict pipeline failures and conditions. However, most of these models were limited to the u...

  10. Application of New Techniques, Materials and Technologies in West-East Gas Transportation Pipeline Project

    Institute of Scientific and Technical Information of China (English)

    DongXu

    2004-01-01

    With the application of new techniques, materials and technologies in West-East Gas Transportation Pipeline (WEGTP) project, the design concept of domestic pipeline industrial construction has been updated, speeding up the development and improvement of the strength as a whole in aspects of smelting industry, pipe fabrication, pipeline construction and equipment manufacture, making China's pipeline industry catch up with the trend of development of the world advanced level.

  11. Fatigue assessment of a double submerged arc welded gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Fazzini, Pablo; Otegui, Jose Luis [Universidad Nacional Mar del Plata, Mar del Plata (Argentina). Instituto de Ciencia y Tecnologia de Materiales (INTEMA); Teutonico, Mauricio; Manfredi, Carlos [GIE S.A., Mar del Plata (Argentina)

    2005-07-01

    An uncommon blowout in a 24'' diameter, 7 mm thick API 5L X52 gas pipeline was due to fracture at the longitudinal double submerged arc weld. Oddly enough for gas pipelines, it was found that fatigue cracks had propagated from a large embedded weld defect of lack of fusion resulting from severe geometrical mismatch between inner and outer weld passes. What makes this failure particularly interesting is that: previous in line inspections failed to detect any defect, no evidence of third party damage was found, and very few large pressure cycles had been recorded during the last 5 years of service, which were believed to be representative of the entire service life of the pipeline. Fatigue tests were carried out to characterize propagation of fatigue cracks in weld metal, it was found that a large Paris exponent made the few large amplitude cycles most contributing to crack propagation. Crack growth path and striation patterns were studied. Fatigue growth was modelled by integrating experimental results and by extrapolating striation spacing in the fracture surface of the failed pipe. Crack growth path and striation patterns were studied. It was found that microstructure discontinuities govern propagation at low {delta}K, but one striation per cycle was produced at large {delta}K, due to a mostly ductile propagation mode. Fatigue growth was modelled by integrating experimental results and by extrapolating striation spacing in the fracture surface of the failed pipe. It was found that in the early life of the line many more large pressure cycles than expected had occurred. Good correspondence between predicted and actual fatigue lives was in this way obtained (author)

  12. Decision and risk assessment in natural gas pipeline planning

    Energy Technology Data Exchange (ETDEWEB)

    Craig, R.L. [Nova Gas Transmission Ltd., Calgary, Alberta (Canada). Business Development

    1996-12-01

    This paper will document the application and benefits of using a rigorous decision making and risk assessment process in a gas pipeline planning environment. A comprehensive step by step decision making procedure has been developed to disaggregate decision making into discrete stages and to apply tools and processes to each stage. The analyst and the decision maker work through each of the decision stages together and develop a thorough joint understanding of the problem. The result is better decisions. The risk assessment process forces the analyst to focus not only on facts or readily calculable variables but also on unknowns or uncertainties. Uncertainties invariably creep into the decision making process and serve to cloud and complicate the decision process. Risk assessment involves undertaking probabilistic assessments of uncertainties in order to understand their potential influence or impact on the decision. In this way, the decision maker understands the true range of risk and reward that accompanies each decision. This paper highlights this risk assessment process, and describes a risk assessment of a large scale gas pipeline decision involving $200 million in capital expenditures.

  13. Corrosion Prevention And Control In High Pressure Oil And Gas Transmission Pipelines

    International Nuclear Information System (INIS)

    At the start of the 1990s there were concerns over the increasing threat of corrosion to the integrity of high-pressure oil and gas transmission pipelines. For example: corrosion was the major cause of reportable incidents in North America (1]. Corrosion was the major cause of pipeline failure in the Gulf of Mexico [2]. Corrosion in a North American onshore oil pipeline had required over $1 billion in repairs(3]. Internal corrosion along the complete length of pipelines had resulted in replacement[4] . However, the worldwide published failure statistics indicate that the incidents of corrosion are not increasing year on year(5-9]. Indeed, CONCA WE[8,9] statistics (for pipelines In Western Europe) show that the failure rate from corrosion (the most likely failure mode with increasing age) has not increased with pipeline age (Figure 1). In fact the statistics for gas pipelines in Europe

  14. 77 FR 41975 - Southern Star Central Gas Pipeline, Inc.; Notice of Application

    Science.gov (United States)

    2012-07-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Application Take notice that on June 27, 2012, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed...

  15. 77 FR 38622 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2012-06-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on June 4, 2012, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro,...

  16. 78 FR 68835 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2013-11-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on October 31, 2013, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro,...

  17. 78 FR 25264 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on April 16, 2013, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro,...

  18. 78 FR 53746 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2013-08-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on August 13, 2013, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro,...

  19. 77 FR 14517 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2012-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on February 21, 2012 Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Highway 56,...

  20. 78 FR 13663 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2013-02-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on February 11, 2013, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, P.O. Box...

  1. 75 FR 8053 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2010-02-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization February 16, 2010. Take notice that on January 29, 2010, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700...

  2. The Technical Specification and Physical Performance Level of Line Pipes for West-East Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    FengBin; WangMaotang; LiuFangming; XiaoLiming

    2004-01-01

    The west-east gas transmission engineering is an important project attracting domestic and foreign attention. The gas pipeline used in this project is a gas pipeline with the longest distance, largest pipe diameter and highest transmission pressure in the history of petroleum pipeline construction of China. For the construction of top-rank gas pipeline in the world with high standard, high speed and high benefit, the key of specifying production of metallurgical and pipe-making enterprises and ensuring quality performance of the steel and steel pipe is to research and formulate a feasible and satisfactory technical Specification for engineering steel and steel pipe with international level. In this paper the author introduces the establishment of the technical specification for West-East gas pipeline project, and lays emphasis on the analysis and discussion of principle and method determining major technical indexes related to line pipes for West-East gas pipeline. The author also introduces actual material selection of gas pipeline home and abroad, and presents examination and application of the technical specification for West-East gas pipeline.

  3. Geohazard assessment lifecycle for a natural gas pipeline project

    Science.gov (United States)

    Lekkakis, D.; Boone, M. D.; Strassburger, E.; Li, Z.; Duffy, W. P.

    2015-09-01

    This paper is a walkthrough of the geohazard risk assessment performed for the Front End Engineering Design (FEED) of a planned large-diameter natural gas pipeline, extending from Eastern Europe to Western Asia for a total length of approximately 1,850 km. The geohazards discussed herein include liquefaction-induced pipe buoyancy, cyclic softening, lateral spreading, slope instability, groundwater rise-induced pipe buoyancy, and karst. The geohazard risk assessment lifecycle was comprised of 4 stages: initially a desktop study was carried out to describe the geologic setting along the alignment and to conduct a preliminary assessment of the geohazards. The development of a comprehensive Digital Terrain Model topography and aerial photography data were fundamental in this process. Subsequently, field geohazard mapping was conducted with the deployment of 8 teams of geoprofessionals, to investigate the proposed major reroutes and delve into areas of poor or questionable data. During the third stage, a geotechnical subsurface site investigation was then executed based on the results of the above study and mapping efforts in order to obtain sufficient data tailored for risk quantification. Lastly, all gathered and processed information was overlain into a Geographical Information database towards a final determination of the critical reaches of the pipeline alignment. Input from Subject Matter Experts (SME) in the fields of landslides, karst and fluvial geomorphology was incorporated during the second and fourth stages of the assessment. Their experience in that particular geographical region was key to making appropriate decisions based on engineering judgment. As the design evolved through the above stages, the pipeline corridor was narrowed from a 2-km wide corridor, to a 500-m corridor and finally to a fixed alignment. Where the geohazard risk was high, rerouting of the pipeline was generally selected as a mitigation measure. In some cases of high uncertainty in

  4. Planning the network of gas pipelines through modeling tools

    Energy Technology Data Exchange (ETDEWEB)

    Sucupira, Marcos L.L.; Lutif Filho, Raimundo B. [Companhia de Gas do Ceara (CEGAS), Fortaleza, CE (Brazil)

    2009-07-01

    Natural gas is a source of non-renewable energy used by different sectors of the economy of Ceara. Its use may be industrial, residential, commercial, as a source of automotive fuel, as a co-generation of energy and as a source for generating electricity from heat. For its practicality this energy has a strong market acceptance and provides a broad list of clients to fit their use, which makes it possible to reach diverse parts of the city. Its distribution requires a complex network of pipelines that branches throughout the city to meet all potential clients interested in this source of energy. To facilitate the design, analysis, expansion and location of bottlenecks and breaks in the distribution network, a modeling software is used that allows the network manager of the net to manage the various information about the network. This paper presents the advantages of modeling the gas distribution network of natural gas companies in Ceara, showing the tool used, the steps necessary for the implementation of the models, the advantages of using the software and the findings obtained with its use. (author)

  5. Ultrasonic semi-batch pigging of a gas pipeline; Ultraschallmolchung einer Gasleitung im Halbbatchverfahren

    Energy Technology Data Exchange (ETDEWEB)

    Erfurth, Jens; Stratmann, Jochen; Hille, Christian [Open Grid Europe GmbH, Essen (Germany)

    2012-11-01

    Ultrasonic inspections of pipelines need a contact fluid (e.g. water) between the sensor and pipe wall and can therefore not be carried out during operation of a gas pipeline. Further, in the project described sufficient spatial resolution of the data was only possible by semi-batch pigging in a completely water-filled pipeline. The inspection therefore had to be planned carefully on the basis of simulations.

  6. New technical and economic solutions for gas exploitation in the Amazon region (Peru-Brazil Pipeline)

    Energy Technology Data Exchange (ETDEWEB)

    Carrera, G.Z.; Santos, E.M. dos [Sao Paulo Univ., (Brazil)

    2000-07-01

    The oil and gas potential in Brazil's Amazon region and neighbouring countries was discussed with particular focus on the economic feasibility of developing a pipeline system to transport the resource from the reserves to potential markets. The natural gas energy option in particular, has been attracting governments and investors due to the lower capital cost required for gas-fired power plants as compared to hydroelectric systems that can still be developed in the region. It is also more competitive than current diesel or fuel oil power generation. Currently, the huge energy costs in the Brazilian Amazon region inhibit regional economic growth and development. It is estimated that the introduction of gas-fired power plants could reduce the regional generation cost to about $40 US MWh from $150 US MWh. The biggest challenge in doing so, however, lies in the large distances that separate the gas fields from the large cities where the market is concentrated. This paper presented the following 4 transportation options for linking the gas to markets in a transnational pipeline: (1) Pipeline Camisea - Porto Velho, (2) Pipeline Camisea - Porto Velho - Manaus, (3) Pipeline Camisea - Porto Velho - Caceres, and (4) Pipeline Camisea - Port Velho -Manaus combined with Porto Velho - Caceres. For each option, the authors described the route, the distances involved, the maximum gas flow forecasted, the pipeline diameter, the operational pressures and the requested compression stations. 5 refs., 4 tabs., 4 figs.

  7. Construction of the Second Weet-East Gas Pipeline Kicked Off

    Institute of Scientific and Technical Information of China (English)

    Zhang Lifeng

    2008-01-01

    @@ The operation of the second West-East Gas Pipeline was started in Xinjiang, Gansu, Ningxia, and Shaanxi on February 22, 2008. It is the nation's first large-scale pipeline project introducing natural gas from other countries, which will be used to transmit the natural gas from the Middle Asia and Xinjiang to the Pearl River Delta, the Yangtze River Delta, and the middle east China.

  8. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Science.gov (United States)

    2010-02-02

    ... final rule published December 4, 2009 (74 FR 63906), is correctly revised from February 2, 2010, to... INFORMATION: In FR Doc. E9-28467 appearing on page 63906 in the Federal Register of Friday, December 4, 2009... Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 RIN 2137-AE15 Pipeline...

  9. The Second International Conference on Northeast Asia Natural Gas Pipeline Held in Beijing

    Institute of Scientific and Technical Information of China (English)

    Chen Ying

    1997-01-01

    @@ The Second International Conference on Northeast Asia Natural Gas Pipeline co-sponsored by the National Pipeline Research Society of Japan, the Korea Pan-Asia Natural Gas Pipeline Association and China National Petroleum Corporation was held in Beijing, during September 23-24,1996. The 145 participants were from 13 countries, i.e.,Japan, South Korea, China, Russia, Mongolia, North Korea,Thailand, the USA, UK, Canada, Australia, Germany and Italy. The Conference mainly aimed at providing an opportunity for making a discussion on the Northeast Asia Pipeline and acted as a preparatory meeting to establish an organization for joint study on an international natural gas pipeline network in the Northeast Asia region.

  10. The international natural gas market : the role for developing countries

    International Nuclear Information System (INIS)

    In the year 2000, natural gas accounted for 24 per cent of global energy consumption. This is expected to rise to 27 per cent in 2020 because natural gas has many advantages over other fossil fuels. It is abundant, there are 60 years of reserves, plus it is a clean fuel that is being used increasingly for electric power generation. The main focus of this paper is to assess the role that will be played by developing countries in the natural gas industry in terms of natural gas supply on a global scale in the coming 20 years. A review is presented of the current status of companies involved in gas production, gas marketing, and gas distribution via pipeline. Industrialized countries currently hold 47 per cent of the world reserves of natural gas, but they produce 73 per cent of commercialized gas and they consume 85 per cent. In contrast, developing countries hold the remaining 53 per cent of the world reserves of natural gas, produce 27 per cent, but only consume 15 per cent. Six of the 12 top world gas producers are developing countries. These include Algeria, Indonesia, Iran, Saudi Arabia, Malaysia, and Mexico. Of these 6, only Algeria, Indonesia and Malaysia export natural gas. A large proportion of recent gas discoveries have occurred in developing countries such as Nigeria, Congo, Algeria, Argentina, Bolivia, Brazil, and Trinity and Tobago. This paper also presented an analysis of risks facing international developers is presented. The risks include those associated with gas market volatility and pipelines in developing countries. 3 refs., 4 tabs

  11. Karst hazard assessment in the design of the main gas pipeline (South Yakutia)

    Science.gov (United States)

    Strokova, L. A.; Dutova, E. M.; Ermolaeva, A. V.; Alimova, I. N.; Strelnikova, A. B.

    2015-11-01

    The paper represents the description of the zonal and regional geological factors of geoengineering conditions which characterize the territory in South Yakutia crossed by the designed main gas pipeline. Cryogenic processes and karst are considered to be the most dangerous hazards for gas pipeline maintenance. Karst hazard assessment of the gas pipeline section made in the course of the research has involved a complex of geological methods: geoengineering, geophysical, hydrogeological, and mapping. Sections prone to karst development have been identified. The authors have suggested the measures to protect potentially hazardous sections and to ensure timely informing on sinkhole collapses.

  12. SAFE AND EFFICIENT OPERATION OF THE WEST-EAST GAS PIPELINE FOR FIVE YEARS

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    @@ The West-East gas pipeline in China has been operated for five years since the commencement of operation on Oct.1st,2003,Over the past five years the pipeline has maintained its safe,stable and high efficint status and brought favorable economic ,social and environmental effects.

  13. Efficiency estimation of electrical protection in the underground oil and gas pipelines

    International Nuclear Information System (INIS)

    Full text : The method of determination damage, caused by installation of protectors unsufficient quantity in underground oil and gas pipelines group, is offered in this article. The method is based in comparison the pipeline protection zones among themselyes with a choice of protectors number

  14. Monitoring and prediction of geotechnical and environmental risks for security in natural gas transportation; Monitoramento e previsao de riscos geotecnicos e ambientais para seguranca no transporte do gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Chamecki, Paulo R.; Ligocki, Laryssa P.; Andrade, Heber A.C.; Manzolli, Andre; Horbatiuk, Borys W.D. [LACTEC - Instituto de Tecnologia para o Desenvolvimento, Curitiba, PR (Brazil); Strieder, Adelir J.; Quadros, Telmo F.P.; Buffon, Sergio A.; Stupf, Leonardo; Bressani, Luiz A.; Bica, Adriano V. Damiani [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil); Schiafino, Antonio V.; Bastos, Cesar B. [Fundacao Universidade Federal do Rio Grande (FURG), RS (Brazil); Radu, Marcos S.; Nascimento Filho, Lenart P. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Santoro, Alcides [Centro de Tecnologias do Gas (CTGAS), Natal, RN (Brazil); Vasconcellos, Carlos R.A.; Oliveira, Hudson R. [TBG - Transportadora Brasileira Gasoduto Bolivia-Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    In order to take care of the consumption issues, often the bands of pipelines have to cross regions that do not present ideal conditions in terms of geotechnical and geologic characteristics. The present work describes a research in progress, involving a partnership between LACTEC, UFRGS, RedeGasEnergia and FINEP, that aims the development of a methodology for instrumentation and remote monitoring of places which present risks to the infrastructure of the gas-lines and the environment, due to geological and geotechnical conditions, as well as the definition of these places. The methodology is practically concluded and will be applied in the place defined for the case study in natural gas Bolivia-Brazil gas-line. Satellite images are being used, along whit computational modeling, geophysical methods, exploratory boreholes and field and laboratory tests, for the definition of points of risk. In the remote monitoring, besides a data communication system, residual stress test of the pipelines, strain gauges and automatic instruments, inclinometers, piezometer and pluviometers are being used. (author)

  15. GASVOL 18'' gas pipeline - risk based inspection study

    Energy Technology Data Exchange (ETDEWEB)

    Bjoernoey, Ola H.; Etterdal, Birger A. [Det Norske Veritas (DNV), Oslo (Norway); Guarize, Rosimar; Oliveira, Luiz F.S. [Det Norske Veritas (DNV) (Brazil); Faertes, Denise; Dias, Ricardo [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes a risk based approach and inspection planning as part of the Pipeline Integrity Management (PIM) system for the 95.5 km long 18'' GASVOL gas pipeline in the South eastern region of Brazil transporting circa 5 000 000 m3 dry gas per day. Pipeline systems can be subject to several degradation mechanisms and inspection and monitoring are used to ensure system integrity. Modern pipeline regulations and codes are normally based on a core safety or risk philosophy. The detailed design requirements presented in design codes are practical interpretations established so as to fulfill these core objectives. A given pipeline, designed, constructed and installed according to a pipeline code is therefore the realization of a structure, which, along its whole length, meets the applicable safety objectives of that code. The main objective of Pipeline Integrity Management (PIM) is to control and document the integrity of the pipeline for its whole service life, and to do this in a cost-effective manner. DNV has a specific approach to RBI planning, starting with an initial qualitative assessment where pipelines and damage type are ranked according to risk and potential risk reduction by an inspection and then carried forward to a quantitative detailed assessment where the level of complexity and accuracy can vary based on availability of information and owner needs. Detailed assessment requires significant effort in data gathering. The findings are dependent upon the accuracy of the inspection data, and on DNV's interpretation of the pipeline reference system and simplifications in the inspection data reported. The following specific failure mechanisms were investigated: internal corrosion, external corrosion, third party interference, landslides and black powder. RBI planning, in general words, is a 'living process'. In order to optimize future inspections, it is essential that the analyses utilize the most recent information regarding

  16. Cracking resistance study of steel for gas pipelines; Badania odpornosci stali przeznaczonej na rurociagi gazowe

    Energy Technology Data Exchange (ETDEWEB)

    Wasiak, J.; Bilous, W.; Hajewska, E.; Szteke, W.; Wagner, T. [Institute of Atomic Energy, Otwock-Swierk (Poland)

    1996-12-31

    The results of cracking resistance of steel tubes for gas pipelines have been performed. The temperature dependence of mechanical properties of X56 steel used as tube material have been shown. 2 refs, 6 figs, 4 tabs.

  17. Oil and Gas Pipelines in the Gulf of Mexico from BOEM

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A line file representing locations of the pipeline infrastructure in the Gulf of Mexico associated with the oil and gas industry is presented. These layers were...

  18. Outer Continental Shelf Oil and Natural Gas Pipelines - Gulf of Mexico Region NAD 27

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This polyline data set contains the locations of oil and gas pipelines in the Gulf of Mexico Outer Continental Shelf federal waters that are associated with the oil...

  19. Social and Economic Benefits of the West-East Gas Pipeline Project

    Institute of Scientific and Technical Information of China (English)

    Li Xiangyang

    2002-01-01

    @@ On July 4 2002, a project attracting world attention, i.e., the West-East Gas Pipeline Project was declared in full-scale commencement. The project will write history with its enormous social and economic benefits.

  20. The tightness of the globe valves in the exploitations practice of the gas pipe-lines

    International Nuclear Information System (INIS)

    Technological units of the Transit Gas Pipeline (i.e. Compressor Stations, Valve Stations, Stations or National Network Service Installations) have been fitted with Ball Valves as shut-off devices (block valves). Internal tightness of the valves' seat becomes major factor in securing proper service conditions during normal pipeline operation as well as for isolating of pipeline sections in emergency situations (loss of pipeline integrity or uncontrolled gas escape). Internal tightness of the valves is being inspected during scheduled maintenance of the pipeline units. Any leak revealed during inspection is being repaired, following instructions provided in the Manufacturer's Valve Manual. After a time, some cases have been identified, when repair of the revealed leak was found to be difficult, despite close following of the repair manuals. The paper presents analysis of the issue and corrective actions taken accordingly. (authors)

  1. Alarm management in gas pipeline plant: a case study

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Juliano; Lima, Marcelo; Leitao, Gustavo; Guedes, Luiz Affonso [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil); Branco, Nicolau; Coelho, Robson; Elias, Gustavo Passos; Nunes, Marcelo [Transportadora Brasileira Gasoduto Bolivia-Brasil (TBG), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    In order to improve the requirements of industrial processes, many decision support systems have been introduced in recent years. In this context, the alarm management systems have great relevance. On the other hand, the informatics revolution allowed a great increase of information concerning the operation of the industrial processes. Currently, process operators handle an excessive number of about 1.500 alarms per day. Thus, this overdose of information implies in the discredit of alarms. Then, in order to improve the operation activities of industrial processes, it is mandatory to incorporate procedures to evaluate and rationalize alarms. Since the EMMUA191 Standard is the reference guide to alarm management, but it does not specify how to execute an alarm management procedure, in this paper, a systematic procedure to evaluate alarms configurations in industrial processes is proposed. This procedure is in line with EMMUA191 and is composed by the following steps: to use statistics analyses to identify problematic alarms, such as occurrence, intermittency, correlation, and flooding calculation; to indicate problematic alarm group; and to propose a set of actions to be implemented. To validate our proposal, we present a case study in a gas pipeline plant using the BR-AlarmExpert software. (author)

  2. The development of a natural gas transportation logistics management system

    International Nuclear Information System (INIS)

    Efficient management of the natural gas business chain - based on pipeline transmission networks and taking into consideration the interaction among the main players (e.g., shippers, suppliers, transmission companies and local distribution companies) - requires the use of decision-making support systems. These support systems maximise resources and mitigate contingencies due to gas supply shortfalls, operational contingencies from scheduled and non-scheduled equipment outages and market demand shortfalls. This study presents a practical use for technologies, such as a thermohydraulic simulation of gas flow through pipelines, a Monte Carlo simulation for compressor station availability studies, an economic risk evaluation related to potential revenue losses and contractual penalties and linear programming for the maximisation of income and the minimisation of contractual penalties. The proposed system allows the optimum availability level to be defined and maintained by the Transporter (by installing reserve capacity) to mitigate losses related to revenue and contractual penalties. It also economically identifies, quantifies and justifies the installation of stand-by compressor units that can mitigate the Transporter's exposure to losses caused by capacity shortfalls as a consequence of scheduled and non-scheduled outages. - Highlights: → We present a DSS to help the decision on investments on spare compressor units of pipelines systems. → The system may be applied to new or existing projects. → The system is able to estimate the revenue losses and the contractual penalties. → An economical evaluation shows the NPV for each configuration of spare units. → The method was applied to the case study of the Bolivia-Brazil gas pipeline.

  3. Seismic/geologic risks as factors in prioritizing gas pipeline system replacement

    International Nuclear Information System (INIS)

    During the past decade, Pacific Gas and Electric Company (PG and E) has intensified efforts to evaluate earthquake hazards and their potential effects on gas and electric power systems, with the goals of implementing reduction of earthquake vulnerability and increasing post-earthquake reliability. The earthquake lifeline engineering approach applied to the gas pipeline system involves identifying potential locations of high-probability, large-magnitude scenario earthquakes; developing seismic zonation maps for surface fault rupture, liquefaction potential, and slope-failure potential; evaluating the condition of the existing gas pipeline system and the consequences of the scenario earthquakes in order to assess and implement mitigations. This paper describes an example of application of this approach to modify the PG and E Gas Pipeline Replacement Program (GPRP), which is a long-term replacement of aging and leak-prone installed pipelines. An additional pipeline prioritization factor is defined and applied to accelerate the replacement of GPRP pipeline segments in areas subject to earthquake effects that are likely to increase gas leak potential

  4. Fresh Users Found for Cangzhou-Zibo Natural Gas Pipeline of PetroChina

    Institute of Scientific and Technical Information of China (English)

    FuHong

    2003-01-01

    On February 18, 2003,PetroChina signed a number of natural gas sales and supply contracts separately with Beijing Jinjie Energy Investment Co Ltd and Shangdong Jinjie Gas Co Ltd,identifying some new users for the Cangzhou-Zibo gas transmission pipeline. Under the agreements,

  5. 78 FR 19409 - Annual Charge Filing Procedures for Natural Gas Pipelines

    Science.gov (United States)

    2013-04-01

    ... Federal Energy Regulatory Commission 18 CFR Part 154 Annual Charge Filing Procedures for Natural Gas... revise the filing requirements for natural gas pipelines that choose to recover Commission-assessed annual charges through an annual charge adjustment (ACA) clause. Currently, natural gas...

  6. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  7. MECHANICAL PROPERTIES OF LONGITUDINAL SUBMERGED ARC WELDED STEEL PIPES USED FOR GAS PIPELINE OF OFFSHORE OIL

    Institute of Scientific and Technical Information of China (English)

    Z.Z. Yang; W. Tian; Q.R. Ma; Y.L. Li; J.K. Li; J.Z. Gao; H.B. Zhang; Y.H. Yang

    2008-01-01

    Since the development of offshore oil and gas, increased submarine oil and gas pipelines were installed. All the early steel pipes of submarine pipelines depended on importing because of the strict requirements of comprehensive properties, such as,anti-corrosion, resistance to pressure and so on. To research and develop domestic steel pipes used for the submarine pipeline, the Longitudinal-seam Submerged Arc Welded (LSAW) pipes were made of steel plates cut from leveled hot rolled coils by both the JCOE and UOE (the forming process in which the plate like the letter "J", "C", "O" or "U" shape, then expansion) forming processes. Furthermore, the mechanical properties of the pipe base metal and weld metal were tested, and the results were in accordance with the corresponding pipe specification API SPEC 5L or DNV-OS-F101, which showed that domestic LSAW pipes could be used for submarine oil and gas pipelines.

  8. Utilisation of gas pipelines - Application of new codes

    Energy Technology Data Exchange (ETDEWEB)

    Bjoernsen, T. [Norske Veritas Industri Norge A/S, Hoevik (Norway)

    1997-12-31

    Current design codes are based upon requirements and safety philosophies introduced many decades ago. Few updates have been done compared to code development in other industries. The changes in the pipeline industry with new pipeline scenarios, standardisation and requirements to cost reduction have forced the industry to reconsider the current codes and look for improvements. Topics in this paper cover: Historical background on codes and standards; pipeline failure statistics; motivation for changes in current codes; limit state based design and safety, risk and reliability; status and standardisation and code development; discussion. 5 figs.

  9. National Wildlife Refuge System Oil and Gas Pipelines

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This dataset is comprised of all pipeline activity, both past and present, located on National Wildlife Refuges. The dataset was acquired from the U.S. Department...

  10. Hybrid laser-gas metal arc welding (GMAW) of high strength steel gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Harris, Ian D.; Norfolk, Mark I. [Edison Welding Institute (EWI), Columbus, Ohio (United States)

    2009-07-01

    Hybrid Laser/arc welding process (HLAW) can complete 5G welds, assure weld soundness, material properties, and an acceptable geometric profile. Combining new lasers and pulsed gas metal arc welding (GMAW-P) has led to important innovations in the HLAW process, increasing travel speed for successful root pass welding. High power Yb fiber lasers allow a 10 kW laser to be built the size of a refrigerator, allowing portability for use on the pipeline right-of-way. The objective was to develop and apply an innovative HLAW system for mechanized welding of high strength, high integrity, pipelines and develop 5G welding procedures for X80 and X100 pipe, including mechanical testing to API 1104. A cost-matched JIP developed a prototype HLAW head based on a commercially available bug and band system (CRC-Evans P450). Under the US Department of Transportation (DOT) project, the subject of this paper, the system was used to advance pipeline girth welding productivity. External hybrid root pass welding achieved full penetration welds with a 4-mm root at a travel speed of 2.3-m/min. Welds were made 'double down' using laser powers up to 10 kW and travel speeds up to 3-m/min. The final objective of the project was to demonstrate the hybrid LBW/GMAW system under simulated field conditions. (author)

  11. Case Study - internal corrosion in natural gas pipelines; Estudo de caso - corrosao interna em dutos transportadores de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Nobrega, A.C.V. da; Barbosa, A.F.F.; Silva, D.R. da [Rio Grande do Norte Univ., Natal, RN (Brazil). Dept. de Quimica. Lab. de Corrosao]. E-mail: anacecilia@eol.com.br; andreafranciscab@yahoo.com; djalma@ccet.ufrn.br; Pimenta, G.S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Peixoto, D.G. [PETROBRAS S.A., Natal/Fortaleza, RN/CE (Brazil). Unidade de Negocios

    2003-07-01

    One of the aspects what more characterize the gas natural is the possibility of your state physical can be adapted the conditions of transport , since the zone where is producing until the region where it is consumer (distant only one from another), you can stand out this three principal alternatives: gas pipelines; in the form of liquefied, in cryogenic ships; in the form of derive compounds that can be liquids or solid. For susceptibilities to the corrosion of the carbons steels used in the equipment and natural gas pipelines of the production reservoirs until the denominated city gates, it makes be necessary to identify the acting corrosive agents and monitoring them along time, because, the failures for internal corrosion in natural gas pipelines can carry serious environmental problems, damages to the image of the distributors companies and prejudices related to operational continuity. Some aspects of the processing of the natural gas are argued, as well as your effect regarding the internal corrosion in natural gas pipelines. To leave of this analysis, it tries establishing a monitoring and controlling methodology of the internal corrosion in field for natural gas pipelines. For chemical characterization of the samples of the black powder were used analyses for Scanning Electron Microscopy, X-Ray Diffraction, X-Ray Fluorescence. (author)

  12. Optimization of the steady operation of Shaanxi to Beijing gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Changchun Wu [China University of Petroleum, Beijing (China); Peng Zhang [Beijing Huayou Gas Company (China); Hongsheng Cui [PetroChina, Beijing (China)

    2005-07-01

    Shaanxi to Beijing gas pipeline is the first one with intermediate compressor stations in China. With one reciprocating compressor station and three centrifugal compressor stations, the pipeline has an annual capacity of about 36..10{sup 8}m{sup 3}. Increasing gas demand in Beijing and commissioning of the three underground gas storage facilities connected to the pipeline make it to operate near to the capacity for most time of a year, which can be approximately considered as steady state. With the goal to minimize the energy cost of the pipeline, a dynamic programming model was established for its optimal steady operation, in which outlet pressures of each compressor station were defined as state variables and compression ratios as decision variables. The optimal solutions of the model showed that the energy cost could be reduced to different extent by means of optimal operation for the different flow-rates of the pipeline, and that the savings of the energy cost from optimal operation may be over 20% compared to the operation schemes specified by traditional experience in some cases. Furthermore, the guidelines for the optimal operation of gas pipelines were revealed from the analysis of the optimal solutions of the model. (author)

  13. Coalbed methane : evaluating pipeline and infrastructure requirements to get gas to market

    International Nuclear Information System (INIS)

    This Power Point presentation evaluated pipeline and infrastructure requirements for the economic production of coalbed methane (CBM) gas. Reports have suggested that capital costs for CBM production can be minimized by leveraging existing oil and gas infrastructure. By using existing plant facilities, CBM producers can then tie in to existing gathering systems and negotiate third party fees, which are less costly than building new pipelines. Many CBM wells can be spaced at an equal distance to third party gathering systems and regulated transmission meter stations and pipelines. Facility cost sharing, and contracts with pipeline companies for compression can also lower initial infrastructure costs. However, transmission pressures and direct connect options for local distribution should always be considered during negotiations. The use of carbon dioxide (CO2) commingling services was also recommended. A map of the North American gas network was provided, as well as details of Alberta gas transmission and coal pipeline overlays. Maps of various coal zones in Alberta were provided, as well as a map of North American pipelines. refs., tabs., figs

  14. A numerical study of liquid film distribution in wet natural gas pipelines

    Science.gov (United States)

    Gao, X. Q.; Zhao, Y. L.; Xu, W. W.; Guan, X. R.; Wang, J. J.; Jin, Y. H.

    2016-05-01

    The software of FLUENT was used to simulate the gas-liquid turbulent flow in wet natural gas pipeline of the Puguang gas field. The RNG k- ɛ model was used to simulate the turbulent flow, the Mixture model was used to simulate gas-liquid mixed phase, and the Eulerian wall film model was used to simulate the formation and development of liquid film. The gas phase flow field characteristics, the distribution of the axial and circumferential film thickness, and the droplet distribution in the pipeline were studied when the gas Reynolds number is 7.72 × 106(10.8m/s). The results can be concluded as followed: Liquid film distributes unevenly along the circumferential direction and mostly distributes under the pipeline wall because of gravity. The impact of the dean vortex and centrifugal force in the straight section can also influence the liquid film distribution. The wall shear stress distributions in horizontal straight pipeline is concerned with liquid membrane volatility, and consistent with the film volatility period, the wall shear stress reached the maximum value in a certain position of wave front. The influence of the wall shear stress on the film fluctuation in inclined pipeline is weakened by gravity and other factors.

  15. Development of a new solvent-free flow efficiency coating for natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Fogg, Graham A.; Morse, Jennifer [Bredero Shaw, Houston, TX (United States)

    2005-07-01

    Pipeline design engineers have traditionally considered external anti-corrosion coatings for the protection of gas transmission pipelines, with less consideration given to the benefits of internal flow efficiency coatings. This paper reviews the benefits of using a traditional solvent-based flow efficiency coating, and the relationship between the internal surface roughness of a pipe, the pressure drop across the pipeline, and the maximum flow rate of gas through the pipeline. To improve upon existing solvent-based flow efficiency coatings, a research program was undertaken to develop a solvent-free coating. The stages in the development of this coating are discussed, resulting in the plant application of the coating and final qualification to API RP 5L2. (author)

  16. Development of ecologically safe method for main oil and gas pipeline trenching

    Directory of Open Access Journals (Sweden)

    Akhmedov Asvar Mikdadovich

    2014-05-01

    Full Text Available Constructive, technical and technological reliability of major pipeline ensures ecological safety on different stages of life circle - beginning with project preparation activities up to the end of major pipeline operation. Even in the process of transition into new life circle stage, no matter if the pipeline needs major repairs or reconstruction, such technical and technological solutions should be found, which would preserve ecological stability of nature-anthropogenic system. Development of ecology protection technologies of construction, reconstruction and major repairs of main pipelines is of great importance not only for a region, but ensures ecological safety across the globe. The article presents a new way of trenching the main oil and gas pipeline, preservation and increase of ecological safety during its service. The updated technological plan is given in the paper for overhaul of the main oil and gas pipeline using the new technology of pipeline trenching. The suggested technical solution contributes to environment preservation with the help of deteriorating shells - the shells’ material decomposes into environment-friendly components: carbon dioxide, water and humus. The quantity of polluting agents in the atmosphere decreases with the decrease of construction term and quantity of technical equipment.

  17. CHARACTERIZATION OF EXTERNAL INDUCED CORROSION DEGRADATION OF AJAOKUTA-ABUJA GAS PIPELINE SYSTEM, NIGERIA

    Directory of Open Access Journals (Sweden)

    ADEDIPE OYEWOLE

    2011-11-01

    Full Text Available Characterization of External Induced corrosion degradation of Ajaokuta- Abuja gas pipeline system was successfully carried out. The objective of this work is to analyze the mechanism of corrosion, analyze the effect of the corrosion on oil and gas pipeline and to evaluate the corrosion potential of a pipeline route. These were achieved by carrying out resistivity experiment on every one kilometer on the right of way (ROW of the pipeline. Soil and water aggressiveness test was also carried out on soil and water sample of the pipeline route respectively. The resistivity result was considerably high, chemical analysis revealed that the soil and wateracidity is between the pH of 6.7 and 8.2 respectively, which is moderately alkaline in nature, which makes the soil environment not conducive for pipelines due to potential for corrosion attack. The chloride content of the soil and water were also high. Based on the experimental results, it was proposed that the pipe should be laid on2-5m below the ground and that the galvanic anode for cathodic protection be located 1m below the ground, in order to avoid corrosion. It is therefore necessary to note that characterization of external corrosion is quite different from internal pipeline corrosion characterization.

  18. 76 FR 7238 - Pipeline Safety: Dangers of Abnormal Snow and Ice Build-Up on Gas Distribution Systems

    Science.gov (United States)

    2011-02-09

    ... Build-Up on Gas Distribution Systems AGENCY: Pipeline and Hazardous Materials Safety Administration... owners and operators of petroleum gas and natural gas facilities of the need to take the appropriate steps to prevent damage to pipeline facilities from accumulated snow or ice. Past events on natural...

  19. Justification for internal coating of natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Asante, B. [NOVA Gas Transmission Ltd., Calgary, Alberta (Canada). System Design Dept.

    1995-12-31

    One of the major considerations in the design of a pipeline is the decision to coat or not to coat the pipe internally. This decision is essentially an economic one. It requires a detailed evaluation of the costs and benefits of internal coating over the projected life of the pipeline. Some of the benefits of internal coating have been confirmed by experimental studies conducted by various pipeline companies. These studies established, among other things, that coating pipes internally could increase pipeline capability by up to 15%. For lines with fixed capacities, this could mean substantial savings in associated compressor fuel and consequently, lower operating cost of transmission. There are also some intangible benefits associated with internal coating. For example, internal coating offers protection against corrosion due to atmospheric oxidation during storage and also due to the presence of corrosive components in the transported material during service. Coated pipes are also easier to inspect for defects such as dents, cracks, quench marks and weld undercuts, which may result in catastrophic failure of the line if undetected. A survey of some major pipeline companies in North America which employ internal coating indicated that most of these patrons regard it as merely ``good practice``. Thus, very few had a defensible procedure for adequately quantifying and justifying the application of internal coating. This paper outlines a procedure for adequately evaluating the costs and benefits of internal coating.

  20. Development of natural gas and pipeline capacity markets in the United States

    OpenAIRE

    Juris, Andrej

    1998-01-01

    Deregulation of the U.S. natural gas industry has been under way since the late 1970s. The industry was deregulated to create competitive markets in natural gas and its pipeline transportation, in the expectation that competition would guide transactions toward a more efficient outcome. The author provides an overview of the deregulation process and its effect on the development and functioning of natural gas and gas transportation markets in the United States. He analyzes the trading of pipe...

  1. Experimental research on biomimetic drag-reducing surface application in natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Luo, Yuehao; Zhang, Deyuan [Beihang Univ., Beijing (China). School of Mechanical Engineering and Automation

    2012-12-15

    In the context of natural gas pipelines the application of biomimetic drag-reducing technology has been proposed for the purpose of reducing wall resistance and increasing the transportation capacity by virtue of smooth internal coating. In this article, in order to validate the drag reduction effect, the precured micro-rolling technology (PCMRT) was adopted to fabricate the biomimetic drag-reducing pipes, and the field testing experiment with natural gas was performed for the first time, achieving a maximum drag reduction of 8.68%, which proves the feasibility of the application of this new technology in natural gas pipelines. (orig.)

  2. Hierarchical Leak Detection and Localization Method in Natural Gas Pipeline Monitoring Sensor Networks

    OpenAIRE

    Ning Yu; Renjian Feng; Jiangwen Wan; Yinfeng Wu; Yang Yu

    2011-01-01

    In light of the problems of low recognition efficiency, high false rates and poor localization accuracy in traditional pipeline security detection technology, this paper proposes a type of hierarchical leak detection and localization method for use in natural gas pipeline monitoring sensor networks. In the signal preprocessing phase, original monitoring signals are dealt with by wavelet transform technology to extract the single mode signals as well as characteristic parameters. In the initia...

  3. PetroChina Starts Construction of Zhongxian-Wuhan Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    @@ Senior Vice President of PetroChina Su Shulin made an announcement to start construction of Zhongxian-Wuhan gas pipeline at the ceremony held in Yichang, Hubei Province, on August 28 to kick off the pipeline project. Some high-ranking officials attended the kick-off ceremony, including Vice Mayor of Chongqing Municipality Wu Jianong, Vice Governor of Hunan Province Zheng Maoqing and Vice Governor of Hubei Province Ren Shimao.

  4. Integration of the commercial and operational systems for the supply of services related to the transportation of natural gas; Integracao entre sistema comercial e operacional para prestacao de servicos de transporte de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Faria, Jose Aurelio Carvalho de; Silva, Mauricio dos Santos [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Varon, Rene [Energy Solutions International Inc., Houston, TX (United States)

    2003-07-01

    Transportadora Brasileira Gasoduto Bolivia-Brazil S.A. - TBG, In order to perform with efficiency and quality, has always been committed to providing its customers with the best services and support. This commitment has been materialized with the recent implementation of a state-of-the-art technology that allows TBG to automatically manage all of its requests for services and to guarantee the delivery of gas to its customers is done in a safe way, optimizing pipeline capacity. To offer these levels of service, it was necessary to acquire a field proven solution capable of managing all commercial procedures as well as providing the right tools to operation to evaluate the capacity to move gas throughout the pipeline. Therefore the solution also was required to be easily integrated with existing operational and commercial tools such as the SCADA system and SAP R3 software. Reductions of fuel consumption and mitigation of risks against contractual penalties are some of the benefits reached. (author)

  5. 77 FR 22387 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-04-13

    ... Privacy Act Statement in the Federal Register published on April 11, 2000 (65 FR 19477) or visit http... transmission annual report) to provide a mechanism for owners and operators to identify those segments of..., Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and...

  6. 76 FR 78636 - Southern Star Central Gas Pipeline, Inc.; Supplemental Notice of Intent To Prepare an...

    Science.gov (United States)

    2011-12-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Supplemental Notice of Intent To Prepare an Environmental Assessment for the Proposed Alden Gas Storage Field Expansion Project and Request for Comments On Environmental...

  7. The use of the internal epoxy coating in the gas pipelines

    International Nuclear Information System (INIS)

    The subject of the presentation is to show the impact of internal pipe coating on capacity of the gas transit system. There are technical and economical aspects of internal coating application in the presentation. The technical attributes and the results of economical factors prove the benefit of the use the internal coating in the gas pipelines. (author)

  8. Mathematical model of a multi-loop network of gas pipelines at various modes of current

    Directory of Open Access Journals (Sweden)

    Orifjon Sh. Bozorov

    2012-05-01

    Full Text Available A method of hydraulic calculation of a multi-loop network of gas pipelines based on Kirchhoff’s laws is offered. As completing relations, the formula for the change of pressure on elementary sites of the horizontal gas pipe, received on the basis of Leybenzon’s generalized formula of resistance is used.

  9. THE DEVELOPMENT AND THE STRATEGY OF THE OIL AND GAS PIPELINES OF RUSSIA

    Science.gov (United States)

    Motomura, Masumi

    The Russian oil and gas industry earns more than half of the Russian tax revenue and foreign currency, and has been playing the role of the backbone of the state economy through the eras of the Soviet Union and the Russian Federation. With the elongation of distance to the European market from the oil producing regions, starting from Baku in the era of Imperial Russia to the Second Baku (Volga-Ural) and the third Baku (West Siberia) in turn, the role of the oil pipeline system as the transportation infrastructure became more and more important and the deployment of pipelines has become one of the indispensable pillars of oil strategy. Now, the oil pipeline network is to reach the Pacific Ocean, which will enable Northeast Asia to be added as a destination for Russian oil, with a result of expanding influence for Russia in these regions. On the other hand, gas exports from the Soviet Union to Eastern Europe started in 1967 by constructing a trunk pipeline from Ukraine, which was extended to West Germany in 1973, overcoming the confrontation between the East and the West and becoming a regional stabilizer. The United States considered this pipeline as an energy weapon and criticized this deal by saying that when Soviet gas flows to Western Europe, its political influence must flow like the gas itself. However, the Soviet Union collapsed in 1991, while gas transportation continued without any disruption. This is evidence that the gas pipeline from the Soviet Union was purely for a business purpose and was not politicized. Recently, Russia is aiming to export gas to northeastern Asia, which is expected to be a new stabilizer in this region, although different types of diffi culties (especially about the method of determination of the gas price) still need to be resolved.

  10. Oil and gas pipelines with hydrophobic surfaces better equipped to deal with gas hydrate flow assurance issues

    DEFF Research Database (Denmark)

    Perfeldt, Christine Malmos; Sharifi, Hassan; von Solms, Nicolas;

    2015-01-01

    Gas hydrate deposition can cause plugging in oil and gas pipelines with resultant flow assurance challenges. Presently, the energy industry uses chemical additives in order to manage hydrate formation, however these chemicals are expensive and may be associated with safety and environmental...... crystallizer. This indicates that 10 to 14 times less KHI is needed in the presence of a hydrophobically coated surface. These experimental studies suggest that the use of hydrophobic surfaces or pipelines could serve as an alternative or additional flow assurance approach for gas hydration mitigation...

  11. Research on Gas Hydrate Plug Formation under Pipeline-Like Conditions

    Directory of Open Access Journals (Sweden)

    Florian Stephan Merkel

    2015-01-01

    Full Text Available Hydrates of natural gases like methane have become subject of great interest over the last few decades, mainly because of their potential as energy resource. The exploitation of these natural gases from gas hydrates is seen as a promising mean to solve future energetic problems. Furthermore, gas hydrates play an important role in gas transportation and gas storage: in pipelines, particularly in tubes and valves, gas hydrates are formed and obstruct the gas flow. This phenomenon is called “plugging” and causes high operational expenditure as well as precarious safety conditions. In this work, research on the formation of gas hydrates under pipeline-like conditions, with the aim to predict induction times as a mean to evaluate the plugging potential, is described.

  12. Remote monitoring of a natural gas pipeline using fiber optic sensors

    Energy Technology Data Exchange (ETDEWEB)

    Cauchi, Sam; Morison, William Donald [Fiber Optic Systems Technology Inc. (FOX-TEK), Bedford, Nova Scotia (Canada)

    2009-07-01

    The pipeline network referred to herein transports natural gas from the NE part of British Columbia through Western Canada into the US Mid-West. Across over 2000 km of the operator's large diameter transmission pipeline system are numerous river crossings and other geotechnical hazards that are continuously identified and risk ranked using a variety of methods, including in line inspection and geotechnical surveys. One particular section of the operator's mainline near Edmonton, Alberta, where railway tracks have recently been installed overtop this vital natural gas transport pipeline, will be the focus of this paper. In order to protect the pipeline from soil stresses to be imposed by heavy cyclic loading during construction of the railway tracks and when trains begin passing overtop, protective concrete structures were constructed around the pipeline within the vicinity of the tracks. While these structures assist in maintaining the integrity of the pipeline in the presence of heavy loading forces, they simultaneously prevent any subsequent access to the pipeline for general inspection and repair. As a result, prior to the construction of the protective concrete structures, the operator made multiple modifications to the pipeline's integrity system within the area of the proposed tracks. This included the enhancement of the cathodic protection to further prevent external corrosion, and the installation of fiber optic strain gauges at multiple sites to ensure that strain levels remain within tolerable limits under the inaccessible area. Background information on operator's pipeline and the layout of the protective concrete structures and railways will be presented in addition to field data obtained using the fiber optic strain monitoring system. An introduction to fiber optic strain gauges will be given, followed by a discussion on the design and installation of the sensors themselves. The particular method used to analyze the strain data is

  13. Detection of gas leaks along pipelines by spectrally tuned infrared imaging

    Science.gov (United States)

    Gross, Werner; Hierl, Thomas; Scheuerpflug, H.; Schirl, U.; Schulz, Max J.

    1998-12-01

    We present a novel method developed for the localization of leaks along natural gas pipelines. Methane distributions in the atmosphere around the leaky pipeline are detected and visualized by spectrally tuned IR imaging. In contrast to conventional techniques which utilize laser radiation sources or scanning, we irradiate the overall region under investigation by 1 kW halogen lamps. The scene background is subtracted by a real-time computer evaluation of the image. The methane gas emitted from the leak creates a flickering cloud in the image which is easily recognized. Methane concentrations as low as 0.03 percent by volume are visible. The method was successfully tested under realistic conditions on a buried pipeline by a natural gas provider.

  14. For the North, from the North : Enbridge perspectives on a Mackenzie Valley gas pipeline

    International Nuclear Information System (INIS)

    The increase in natural gas demand and strong gas prices are the main driving forces behind northern pipeline development. While Western Canada can supply much of the demand growth to key markets in the Pacific Northwest, California, Eastern Canada, as well as the Eastern and Midwestern U.S. it is not expected to supply all the growth. Producers are acquiring land in the Northwest Territories (NWT) and planning to increase drilling activity. In February 2000, Imperial, Gulf, Shell and Mobil entered into an agreement to study the feasibility of developing Mackenzie Delta gas, a study in which Enbridge Inc. participated. Enbridge is the major transporter of Canadian crude oil and liquids and they have a growing involvement in natural gas transmission. They also own and operate the largest gas distribution company in Canada. They have extensive Northern experience and already operate two pipelines in the NWT. The proposed 2,100 km, 36 inch pipeline will transport 1.2 bcf/d of natural gas increasing to 1.7 bcf/d with more compression. Its estimated cost is $4.2 billion. Some of the economic risks of such a project include the need for large amounts of equity, timing of market development, competing sources of gas, and stability of gas prices. The multitude of regulatory processes are also complex. Clarity is needed in many jurisdictional processes. Support of indigenous people is also crucial. A historic January 25, 2000 meeting of Aboriginal leaders of the Northwest Territories resulted in a declaration of support for a Mackenzie Valley pipeline. Protecting the permafrost is also a priority when constructing and operating a pipeline in the North. It is unlikely that Mackenzie Delta gas will flow before 7 years .13 figs

  15. Safety appraisement on building natural gas pipeline over coal mining subsidence area

    Institute of Scientific and Technical Information of China (English)

    GUO Wei-jia; LIU Jin-xiao; WEN Xing-lin

    2007-01-01

    The target of the text is to scientifically appraise dynamic development of surface deformation in subsidence area and its influence on groundwork stability of natural pipe and then adopt some technological measures to ensure safe circulation of natural pipeline. Analysed the influence on natural pipeline from coal mining subsidence in the way of pipeline grade variation, vertical curve variation, transverse deformation, horizontal pull and compression deformation and pipe stress variation etc., and described detailed surface subsidence product and its used time among initial phase, active phase and decline phase in the course of surface movement deformation time. In the context of considering surface subsidence that doesn't reach basic latter end and residual subsidence quantity, the text confirmed the calculation method of residual deformation in surface subsidence area, and gave the technological measures about building natural gas pipeline in subsidence area finally.

  16. Locating Mechanical Damages Using Magnetic Flux Leakage Inspection in Gas Pipeline System

    International Nuclear Information System (INIS)

    Gas transmission pipelines are often inspected and monitored using the magnetic flux leakage method. An inspection vehicle known as a 'pig' is launched into the pipeline and conveyed along the pipe by the pressure of natural gas. The pig contains a magnetizer, an array of sensors and a microprocessor-based data acquisition system for logging data. This paper describes magnetic flux leakage (MFL) signal processing used for detecting mechanical damages during an in-line inspection. The overall approach employs noise removal and clustering technique. The proposed method is computationally efficient and can easily be implemented. Results are presented and verified by field tests from an application of the signal processing

  17. Dynamic Analysis of Pig through Two and Three Dimensional Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Malihe Mirshamsi

    2015-01-01

    Full Text Available This paper deals with the dynamic analysis and simulation of Pipeline Inspection Gage (PIG through the two and three dimensional gas pipelines. Continuity, momentum and the state equations are employed to achieve the gas flow parameters like density, velocity and pressure along the pipeline since the dynamic behavior of the pig depends on the flow field characteristics. Also, a differential equation which governs the dynamic behavior of the pig is derived. The pig is assumed to be a small rigid body with a bypass hole in its body. The variation of the diameter of the bypass port, which is controlled by a valve, is considered in this research. The path of the pig or geometry of the pipeline is assumed to be 2D and 3D curve. 2D and 3D simulations of the pig motion are performed individually using Rung- Kutta method and a case has been solved and discussed for each of them. The simulation results show that the derived equations are valid and effective for online estimating of the position, velocity and forces acting on the pig in gas pipelines at any time of the motion.

  18. North SEa pipelines: a survey of technology, regulation and use conflicts in oil and gas pipeline operation. Final report, Aug-Dec 78

    Energy Technology Data Exchange (ETDEWEB)

    Nothdurft, W.E.

    1980-02-01

    This project was undertaken to provide information on North Sea offshore pipelines and the processes used in route selection decision-making. It is designed to be used by persons involved in offshore oil and gas pipeline planning, including pipeline corridors and landfalls. A brief overview of offshore activity in both the United Kingdom and Norwegian sectors of the North Sea is presented, with special emphasis on the transportation systems established or proposed for the major commercial fields. The report then focuses on the specific issues arising from the installation and operation of each of these transportation systems. These issues include: regulations affecting pipeline placement, criteria for route selection, pipeline trenching and burial, and conflicts with the fishing industry in the North Sea.

  19. Numerical simulation of a gas pipeline network using computational fluid dynamics simulators

    Institute of Scientific and Technical Information of China (English)

    SELEZNEV Vadim

    2007-01-01

    This article describes numerical simulation of gas pipeline network operation using high-accuracy computational fluid dynamics (CFD) simulators of the modes of gas mixture transmission through long, multi-line pipeline systems (CFD-simulator).The approach used in CFD-simulators for modeling gas mixture transmission through long, branched, multi-section pipelines is based on tailoring the full system of fluid dynamics equations to conditions of unsteady, non-isothermal processes of the gas mixture flow. Identification, in a CFD-simulator, of safe parameters for gas transmission through compressor stations amounts to finding the interior points of admissible sets described by systems of nonlinear algebraic equalities and inequalities. Such systems of equalities and inequalities comprise a formal statement of technological, design, operational and other constraints to which operation of the network equipment is subject. To illustrate the practicability of the method of numerical simulation of a gas transmission network, we compare computation results and gas flow parameters measured on-site at the gas transmission enterprise.

  20. AIRBORNE, OPTICAL REMOTE SENSNG OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    Energy Technology Data Exchange (ETDEWEB)

    Jerry Myers

    2005-04-15

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. The scope of the work involved designing and developing an airborne, optical remote sensor capable of sensing methane and, if possible, ethane for the detection of natural gas pipeline leaks. Flight testing using a custom dual wavelength, high power fiber amplifier was initiated in February 2005. Ophir successfully demonstrated the airborne system, showing that it was capable of discerning small amounts of methane from a simulated pipeline leak. Leak rates as low as 150 standard cubic feet per hour (scf/h) were detected by the airborne sensor.

  1. Numerical forecasting surge in a piping of compressor shops of gas pipeline network

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    This paper presents a method of forecasting stable operation of gas compressor unit (GCU) centrifugal supercharger (CFS) installed on a piping of compressor shops servicing gas pipelines. The stability of superchargers operation is assessed in relation to the phenomenon of surge. Solution of this problem amounts to the development and numerical analysis of a set of ordinary differential equations. The set describes transmission of gas through a compressor shop as a fluid dynamics model with lumped parameters. The proposed method is oriented to wide application by specialists working in the gas industry. The practical application of this method can use all-purpose programming and mathematical software available to specialists of gas companies.

  2. A study on the development of repair procedure for gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Kim, W.S.; Kim, Y.P.; Baek, J.H. [R and D Center, Korea Gas Corporation, Ansan (Korea)

    1999-06-01

    In the buried natural gas pipelines, many defects may occur by construction faults, corrosion, third-party interference and ground movement. When a segment of a pipeline is found to be defective, one of the repair methods is to remove its contents and cut out the defective segment after shutting down the pipeline. However, the cost is extremely high in terms of venting and disrupting the gas supply. Therefore, most pipeline companies have developed in-service repair methods without removing the line from service. In general, in order to avoid removing the line from service, direct deposition of weld metal, full-encirclement sleeve, patches, stopple fittings, half-sole and branch connections are required. There are three important concerns in the sleeve-repair welding like other methods of in-service repair-welding. The first concern is the possibility of burn-through which is due to the localized heating and loss of meterial strength on the inner surface of pipe during the welding process. The pipe wall may burst under internal pressure if the loss in strength is too great. The second concern is the high cooling rates by the flowing gas which quickly removes heat from the pipe wall, resulting in accelerated cooling of the weld. Such rapid cooling rates promote the formation of hard heat affected zone microstructure making these welds susceptible to hydrogen cracking. The third concern is for the load carrying ability, such as tensile strength, fracture toughness and fatigue strength. This study was taken to investigate the effect of in-service welding conditions and assess the mechanical properties for the direct deposition welding and sleeve-repair welding of in-service gas pipelines and develope the welding procedure specification for in-service pipeline repair. 81 figs., 40 tabs.

  3. ASSOCIATED PETROLEUM GAS EFFICIENT UTILIZATION SYSTEM IN PIPELINES OPERATING

    Directory of Open Access Journals (Sweden)

    CHUHAREVA N.V.

    2012-01-01

    Full Text Available N this article is described the most common ways of associated petroleum gas utilization, is conducted a brief analysis, is selected method of disposal when using gas turbines and is suggested ways to improve their efficiency.

  4. 78 FR 62012 - Transcontinental Gas Pipeline Company; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-10-11

    ... compressor station facilities along its existing pipeline system in Pennsylvania and New Jersey to provide...,540 horsepower of compression at its existing Compressor Station 195 in York County, Pennsylvania by replacing three existing natural gas-fired reciprocating engines and appurtenant facilities with two...

  5. Research & Development of Grade X70 LSAW Steel Pipes for West-East Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    WangXiaoxiang; SunQi

    2004-01-01

    In this article the research and development of X70 large diameter longitudinal seam submerged arc welded (LSAW) steel pipes for West-East Gas Transportation Pipeline project (WEGTP) in China are introduced, including the key technique, fabrication of pipe production line, mass production and the latest progress of LSAW steel pipe technique.

  6. New method of leak detecting in diagnostic of gas pipeline system

    International Nuclear Information System (INIS)

    This report describes new directions in gas transmission pipelines diagnostics as well as new methods and equipment used to detect leaks. It was also shown that efficient and functional diagnostics system is the necessary condition to keep the exploitation of transmission systems safe. (author)

  7. A wandering probe for tightness testing of the gas pipelines by means of the radiotracer method

    International Nuclear Information System (INIS)

    The report deals with the problem of the application of radiotracer techniques in the examination of the gas pipelines tightness. In particular, it gives a concise description of the construction of a special ''wandering probe'' for the localization of radiotracer leaks extorted in course of the measurements. (author)

  8. 76 FR 52253 - Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines

    Science.gov (United States)

    2011-08-22

    ... the required accounting systems necessary to allocate fuel costs to negotiated, discounted and... Reporting Requirements for Natural Gas Pipelines, Order No. 710-B, 76 FR 4516 (Jan. 26, 2011), 134 FERC ] 61... functions, including transportation, storage, gathering, and exploration/production, and should include,...

  9. Application and numerical simulation research on biomimetic drag-reducing technology for gas pipelining

    Energy Technology Data Exchange (ETDEWEB)

    Zhang Deyuan; Luo Yuehao; Chen Huawei [Beihang Univ., Beijing (China). School of Mechanical Engineering and Automation

    2011-06-15

    For the purpose of increasing the transmission capacity of gas pipelines, the internal coating technology has been vastly put into application, and a remarkable benefit has been achieved so far. However, with the reduction of wall roughness, the small convex parts are all completely submerged in the viscous sublayer, the gas pipeline becomes a 'hydraulic smooth pipe', even by smoothing the coating surface further, it is difficult to reduce wall friction. Therefore, in order to increase the transportation capacity on the basis of internal coating, the new methods and technologies should be researched and investigated, and perhaps, the biomimetic drag-reducing technology is a good approach. In this paper, according to the planning parameters of the second pipeline of the West-to-East gas transmission project, the best drag reducing effect grooves are calculated and designed, and based on the characteristics and properties of internal coating (AW-01 epoxy resin), the Pre-Cured Micro- Rolling Technology (PCMRT) is discussed and presented, the rolling equipment is also designed and analyzed, the rolling process can be easily added on the available production line. Aiming at the field operating parameters of the gas pipeline in China, and the drag-reducing effect of the grooved surface is analyzed and discussed comprehensively. In addition, the economic benefit of adopting the biomimetic drag reduction technology is investigated. (orig.)

  10. Recommendations on X80 steel for the design of hydrogen gas transmission pipelines

    International Nuclear Information System (INIS)

    By limiting the pipes thickness necessary to sustain high pressure, high-strength steels could prove economically relevant for transmitting large gas quantities in pipelines on long distance. Up to now, the existing hydrogen pipelines have used lower-strength steels to avoid any hydrogen embrittlement. The CATHY-GDF project, funded by the French National Agency for Research, explored the ability of an industrial X80 grade for the transmission of pressurized hydrogen gas in large diameter pipelines. This project has developed experimental facilities to test the material under hydrogen gas pressure. Indeed, tensile, toughness, crack propagation and disc rupture tests have been performed. From these results, the effect of hydrogen pressure on the size of some critical defects has been analyzed allowing proposing some recommendations on the design of X80 pipe for hydrogen transport. Cost of Hydrogen transport could be several times higher than natural gas one for a given energy amount. Moreover, building hydrogen pipeline using high grade steels could induce a 10 to 40% cost benefit instead of using low grade steels, despite their lower hydrogen susceptibility. (authors)

  11. 77 FR 43711 - Standards for Business Practices of Interstate Natural Gas Pipelines

    Science.gov (United States)

    2012-07-26

    ... Commission's FY 2009-2014 Strategic Plan \\13\\ objective of evaluating the feasibility of installing waste heat recovery systems as a way to promote the efficient design and operation of jurisdictional natural... Gas Pipelines, Notice of Proposed Rulemaking, 77 FR 10415 (Feb. 22, 2012), FERC Stats. & Regs. ]...

  12. The strategic priorities of the national oil and gas pipeline transport system development

    Directory of Open Access Journals (Sweden)

    Ірина Миколаївна Ісаєва

    2015-01-01

    Full Text Available The retrospective analysis of legal documents governing relations between Ukraine, Russia and the European Union as part of their energy policies was performed. The strategic interests of participating countries and the strategic priorities of the governance with national oil and gas pipeline transport system development in particular were designated

  13. Integral diagnostic in the failure causes of external corrosion of a natural gas transport pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Mora-Mendoza, J.L.; Saucedo-Robles, L.C.; Rodriguez-Clemente, H. [PEMEX Gas y Petroquimica Basica, Subdireccion de Ductos; Marina Nacional 329, Edificio B-1, Piso 8, Col. Huasteca, D.F., CP 11311 (Mexico); Gonzalez-Nunez, M.A. [Instituto de Investigaciones Electricas, Reforma 113, Col. Palmira, Cuernavaca, Morelos, CP 62490 (Mexico); Zavala-Olivares, G.; Hernandez-Gayosso, M.J. [Instituto Mexicano del Petroleo, Direccion de Exploracion y Produccion, Eje Central Lazaro Cardenas Norte 152, Col. San Bartolo Atepehuacan, D.F., CP 07730 (Mexico)

    2011-08-15

    The objective of this study consisted in investigating the possible causes which give rise to the presence of low wall pipe thicknesses on a 16'' natural gas transport pipeline, even though during the last 12-year period cathodic protection (CP) potentials were kept in the protection range at which external corrosion should not occur. Results from in-line inspection from a 16'' natural gas transport pipeline showed 46 indications with more than 80% wall thickness lost due to external corrosion in the second segment of the pipeline. Direct inspection at the indication locations, review of the CP system performance, pipeline maintenance programs and studies, allowed to make an integral diagnostic where it was found out that the main cause of external corrosion was an inappropriate coating application since the pipeline construction, this situation has originated the increase of CP shielding effects through time. (Copyright copyright 2011 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  14. An evaluation of the economic impacts associated with the Mackenzie Valley gas pipeline and Mackenzie Delta gas development

    International Nuclear Information System (INIS)

    The government of the Northwest Territories (NWT) and TransCanada PipeLines Ltd. signed a Memorandum of Understanding on July 28, 1999 identifying a mutual desire to develop the natural gas reserves of the NWT and to construct a pipeline. Both parties have requested an assessment of economic impacts associated with the development and production of gas reserves in the Mackenzie Delta and the construction and operation of a pipeline running from the Mackenzie Delta down the Mackenzie Valley to an interconnect with the TransCanada system in northern Alberta. This study presents an evaluation from the period 2002-2033, for two gas price scenarios. The report concludes that the overall Canadian impacts would be substantial and spread across all regions of Canada plus major sectors including: business services; transportation, communication, and utilities; wholesale and retail trade; construction; manufacturing; the oil and gas sector; and, services associated with mining. The development and production of natural gas reserves in the Mackenzie Delta would result in increases in: Canada's Gross Domestic Product, government revenues, investment revenues, and labour income. It would also result in an increase in total employment across Canada. Other benefits associated with the project include: significant opportunities for economic development in Canada's north; value added from upgrading of incremental gas liquids to petrochemical products; potential increased in discoveries in other areas along the route of the pipeline; potential savings to households in northern communities; savings to gas users in Canada because the incremental gas supply would keep prices low; and gains valued at up to $2.1 billion annually because of avoided greenhouse gas emissions. 38 refs., 14 tabs., 11 figs

  15. Oil and gas wells and pipelines on U.S. wildlife refuges: challenges for managers.

    Directory of Open Access Journals (Sweden)

    Pedro Ramirez

    Full Text Available The increased demand for oil and gas places a burden on lands set aside for natural resource conservation. Oil and gas development alters the environment locally and on a much broader spatial scale depending on the intensity and extent of mineral resource extraction. The current increase in oil and gas exploration and production in the United States prompted an update of the number of pipelines and wells associated with oil and gas production on National Wildlife Refuge System (NWRS lands. We obtained geospatial data on the location of oil and gas wells and pipelines within and close to the boundaries of NWRS lands (units acquired as fee simple (i.e. absolute title to the surface land by the U.S. Fish and Wildlife Service. We found that 5,002 wells are located in 107 NWRS units and 595 pipelines transect 149 of the 599 NWRS units. Almost half of the wells (2,196 were inactive, one-third (1,665 were active, and the remainder of the wells were either plugged and abandoned or the status was unknown. Pipelines crossed a total of 2,155 kilometers (1,339 miles of NWRS fee simple lands. The high level of oil and gas activity warrants follow up assessments for wells lacking information on production type or well status with emphasis on verifying the well status and identifying abandoned and unplugged wells. NWRS fee simple lands should also be assessed for impacts from brine, oil and other hydrocarbon spills, as well as habitat alteration associated with oil and gas, including the identification of abandoned oil and gas facilities requiring equipment removal and site restoration.

  16. Sulfate reducing bacteria detection in gas pipelines; Deteccao de bacterias redutoras de sulfato em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Lutterbach, Marcia Teresa S.; Oliveira, Ana Lucia C. de; Cavalcanti, Eduardo H. de S. [Instituto Nacional de Tecnologia (INT), Rio de Janeiro, RJ (Brazil). Div. de Corrosao e Degradacao]. E-mails: marciasl@int.gov.br; analucia@int.gov.br; eduardoh@int.gov.br

    2004-07-01

    Microbiology induced corrosion (MIC) process associated with sulfate reducing bacteria (BRS) are one of the most important matter of concern for the oil and gas industry as 77% of failures have been attributed this sort of degradation. Corrosion products found present in gas transportation pipelines, the so-called 'black-powder' problem, are also a nuisance and source of economic losses for the gas industry. According to the literature, the incidence of black-powder can be ascribed to the metabolism of BRS that can be found in the gas environment. Integrity monitoring programs of gas pipelines adopt pigging as an important tool for internal corrosion monitoring. Solid residue such as the black-powder, collected by pigging, as well as the condensed, can be seen as a very valuable samples for microbiological analyses that can be used to detect and quantify bacteria related to the incidence of MIC processes. In the present work results concerning samples collected by pigging and condensed are presented. Small populations of viable BRS have been found in the pipeline. It can be seen that the inclusion of microbiological analyses of solid and liquid residues as a complementary action in the integrity monitoring programs adopted by gas transportation industry can be very helpful on the decision making concerning preventive and corrective actions to be taken in order to maintain the CIM processes under control. (author)

  17. Urucu-Manaus gas pipeline: challenges and solutions; Gasoduto Urucu-Manaus: desafios e solucoes

    Energy Technology Data Exchange (ETDEWEB)

    Loureiro, Mauro de O.; Machado, Otto Luiz de M.; Moura, Marcos [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The challenge of building and develop a gas pipeline such as Urucu-Manaus, in the middle of Amazon rain forest, it is beyond to conventional engineering solutions that is common used in this kind of contract. The development of this venture join a large variety of activities since the several techniques of pipeline construction to the improvement the skills of the local workers but never to leave out important points such as integrated management of work, for instance, safety, environment care, health, communication with the involved parts, archaeology, goods and services acquisition, telecommunications and the mean of transportation to equipment and workers. (author)

  18. Auction design for gas pipeline transportation capacity-The case of Nabucco and its open season

    International Nuclear Information System (INIS)

    As a response to the Russian dominance of the EU's natural gas supplies and the EU's increasing gas demands, major gas pipeline projects are currently under way to enhance the EU's energy supply security. Oftentimes to raise financing and to allocate gas transportation capacities, auctions are carried out to allow gas shippers to book transportation rights. In recent years, auctions have emerged as one of the most successful allocation mechanisms in the microeconomic theory. However, different auction designs can lead to different outcomes making the choice of auction design a decisive one, especially for divisible-good auctions. This paper seeks to give a formulation of an optimal auction design for gas pipeline transportation capacity. Specifically three different mechanisms are tested: (i) NPV allocation; (ii) pro rata allocation; and (iii) optimization. In addition, Nabucco is taken as a case study to empirically show results of such auction designs. Results show that a trade-off between revenue optimization and fair allocation can be observed: allocation per optimization is the favorable auction design when revenue maximization is more important than fair allocation. On the other hand, pro rata allocation is the auction design to be chosen when fairness of allocation is considered most central. - Research highlights: → Auction design for gas pipeline transportation capacity. → Empirical market-survey of Nabucco pipeline project auction as input data. → Testing of three different allocation mechanisms: (i) NPV allocation; (ii) pro rata allocation; and (iii) optimization. → Results show a trade-off between revenue optimization and fair allocation. → Allocation per optimization is the favorable auction design when revenue maximization is more important than fair allocation. → On the other hand, pro rata allocation is the auction design to be chosen when fairness of allocation is considered most central.

  19. Auction design for gas pipeline transportation capacity-The case of Nabucco and its open season

    Energy Technology Data Exchange (ETDEWEB)

    Pickl, Matthias, E-mail: matthias.pickl@univie.ac.a [University of Vienna, Faculty of Business, Economics and Statistics (Austria); Wirl, Franz [University of Vienna, Faculty of Business, Economics and Statistics (Austria)

    2011-04-15

    As a response to the Russian dominance of the EU's natural gas supplies and the EU's increasing gas demands, major gas pipeline projects are currently under way to enhance the EU's energy supply security. Oftentimes to raise financing and to allocate gas transportation capacities, auctions are carried out to allow gas shippers to book transportation rights. In recent years, auctions have emerged as one of the most successful allocation mechanisms in the microeconomic theory. However, different auction designs can lead to different outcomes making the choice of auction design a decisive one, especially for divisible-good auctions. This paper seeks to give a formulation of an optimal auction design for gas pipeline transportation capacity. Specifically three different mechanisms are tested: (i) NPV allocation; (ii) pro rata allocation; and (iii) optimization. In addition, Nabucco is taken as a case study to empirically show results of such auction designs. Results show that a trade-off between revenue optimization and fair allocation can be observed: allocation per optimization is the favorable auction design when revenue maximization is more important than fair allocation. On the other hand, pro rata allocation is the auction design to be chosen when fairness of allocation is considered most central. - Research highlights: {yields} Auction design for gas pipeline transportation capacity. {yields} Empirical market-survey of Nabucco pipeline project auction as input data. {yields} Testing of three different allocation mechanisms: (i) NPV allocation; (ii) pro rata allocation; and (iii) optimization. {yields} Results show a trade-off between revenue optimization and fair allocation. {yields} Allocation per optimization is the favorable auction design when revenue maximization is more important than fair allocation. {yields} On the other hand, pro rata allocation is the auction design to be chosen when fairness of allocation is considered most central.

  20. The redefinition of the american and british gas industries: the regulation of the access load to the gas pipelines networks

    International Nuclear Information System (INIS)

    The transport and distribution networks regulation is the main stakes of the regulation reform of the gas industries. This thesis analyzes the models applied in The Usa and in the United Kingdom. The first part deals with the gas industries deregulation in these two countries, the impacts on the economy and the organization of the gas industries. The second part presents a theoretical approach of the regulation applied to the prices of the natural ags transport by gas pipelines. Regulation by the service cost price and by price cap are compared. (A.L.B.)

  1. Positive trends in european gas pipeline incidents; Tendances positives en matiere d'incidents sur les gazoducs europeens

    Energy Technology Data Exchange (ETDEWEB)

    Bolt, R. [EGIG, N.V. Nederlandse Gasunie (Netherlands)

    2000-07-01

    In order to demonstrate the continuing safety level of natural gas onshore transmission pipelines, there has been close co-operation, for many years, between a group of nine major natural gas transmission system operators in Western Europe. In 1982, this co-operation was formalized by the setting up of EGIG (European Gas pipeline Incident data Group). Pipeline incident data between 1970 and 1998 (involving unintentional release of gas) have been collected by the gas transmission system operators from their pipeline system. These data form an extensive database and are of direct relevance to pipeline design, operating and maintenance practices in Europe. In the light of this broad experience and degree of participation, the database can be used to monitor the safety record of European natural gas transmission systems. The overall incident frequency with an unintentional gas release over the period 1970 to 1998 is 0,480 incidents per year per 1000 km pipeline (in other words: one incident per year per 2083 km). However, the figure over the past 5 years is significantly lower: 0,211 incidents per year per 1000 km pipeline (in other words: one incident per year per 4740 km). The failure rate has decreased a factor 5 over the past 29 years. (author)

  2. Application Summary of Remote Sensing Technique of the West-East Gas Transportation Pipeline

    Institute of Scientific and Technical Information of China (English)

    WangWeimin

    2004-01-01

    The West-East Gas Transportation Pipeline (WEGTP) is a strategic project for the energy source transport, which is about 3900km long. The remote sensing technique has the unique superiority to obtain the geographic information. The remote sensing technique is used in WEGTP to interpret comprehensively the information of geology, landform and humane geography along the route of pipeline, and to update the topographic map along the route of Zhengzhou-Shanghai section pipeline, and to interpret finely the crossing point of the Nanjing Changjiang river crossing section. Through the overlap of TM image and the DEM, the complicated landform information can be grasped by the three dimensional flight over the section of complicated geography. The application achievements are managed with RS-GIS service system.

  3. Development of a Neural Fuzzy System for Advanced Prediction of Gas Hydrate Formation Rate in Pipeline

    Directory of Open Access Journals (Sweden)

    Mohammad Javad JALALNEZHAD

    2014-02-01

    Full Text Available With the development of the natural gas industry in the 20th century, the production, processing and distribution of natural gas under high-pressure conditions has become necessary. Under these conditions, it was found that the production and transmission pipelines were becoming blocked with what looked like to be ice. Hammerschmidt determined that hydrates were the cause of plugged natural gas pipelines. Gas hydrates and difficulties related to their formation in production and transmission pipelines and equipment, are the major concerns of the gas industry. The main objective of this study was to present a novel approach to access more accurate hydrate formation rate predicting models based on a combination of flow loop experimental data with learning power of adaptive neural-fuzzy inference systems and more than 900 data points of the , , , and i-  hydrate formation rate. Using this data set different predictive models were developed. It was found that such models can be used as powerful tools, with total errors less than 6 % for the developed models, in predicting hydrate formation rate in these cases.

  4. Evaluation of the sources of error in the linepack estimation of a natural gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Marco, Fabio Capelassi Gavazzi de [Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (TBG), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The intent of this work is to explore the behavior of the random error associated with determination of linepack in a complex natural gas pipeline based on the effect introduced by the uncertainty of the different variables involved. There are many parameters involved in the determination of the gas inventory in a transmission pipeline: geometrical (diameter, length and elevation profile), operational (pressure, temperature and gas composition), environmental (ambient / ground temperature) and those dependent on the modeling assumptions (compressibility factor and heat transfer coefficient). Due to the extent of a natural gas pipeline and the vast amount of sensor involved it is infeasible to determine analytically the magnitude of resulting uncertainty in the linepack, thus this problem has been addressed using Monte Carlo Method. The approach consists of introducing random errors in the values of pressure, temperature and gas gravity that are employed in the determination of the linepack and verify its impact. Additionally, the errors associated with three different modeling assumptions to estimate the linepack are explored. The results reveal that pressure is the most critical variable while the temperature is the less critical. In regard to the different methods to estimate the linepack, deviations around 1.6% were verified among the methods. (author)

  5. A Numerical Corrosion Rate Prediction Method for Direct Assessment of Wet Gas Gathering Pipelines Internal Corrosion

    Directory of Open Access Journals (Sweden)

    Wenlong Jia

    2012-10-01

    Full Text Available The paper introduces a numerical internal corrosion rate prediction method into the internal corrosion direct assessment (ICDA process for wet gas gathering pipelines based on the back propagation (BP, the genetic algorithm (GA and BP, and the particle swarm optimization and BP artificial neural networks (ANNs. The basic data were collected in accordance with the terms established by the National Association of Corrosion Engineers in the Wet Gas Internal Corrosion Direct Assessment (WG-ICDA SP0110, and the corrosion influencing factors, which are the input variables of the ANN model, are identified and refined by the grey relational analysis method. A total of 116 groups of basic data and inspection data from seven gathering pipelines in Sichuan (China are used to develop the numerical prediction model. Ninety-five of the 116 groups of data are selected to train the neural network. The remaining 21 groups of data are chosen to test the three ANNs. The test results show that the GA and BP ANN yield the smallest number of absolute errors and should be selected as the preferred model for the prediction of corrosion rates. The accuracy of the model was validated by another 54 groups of excavation data obtained from pipeline No. 8, whose internal environment parameters are similar to those found in the training and testing pipelines. The results show that the numerical method yields significantly better absolute errors than either the de Waard 95 model or the Top-of-Line corrosion model in WG-ICDA when applying the approach to specific pipelines, and it can be used to investigate a specific pipeline for which the data have been collected and the ANN has been developed in WG-ICDA SP0110.

  6. Operational Challenges in Gas-To-Liquid (GTL) Transportation Through Trans Alaska Pipeline System (TAPS)

    Energy Technology Data Exchange (ETDEWEB)

    Godwin A. Chukwu; Santanu Khataniar; Shirish Patil; Abhijit Dandekar

    2006-06-30

    Oil production from Alaskan North Slope oil fields has steadily declined. In the near future, ANS crude oil production will decline to such a level (200,000 to 400,000 bbl/day) that maintaining economic operation of the Trans-Alaska Pipeline System (TAPS) will require pumping alternative products through the system. Heavy oil deposits in the West Sak and Ugnu formations are a potential resource, although transporting these products involves addressing important sedimentation issues. One possibility is the use of Gas-to-Liquid (GTL) technology. Estimated recoverable gas reserves of 38 trillion cubic feet (TCF) on the North Slope of Alaska can be converted to liquid with GTL technology and combined with the heavy oils for a product suitable for pipeline transport. Issues that could affect transport of this such products through TAPS include pumpability of GTL and crude oil blends, cold restart of the pipeline following a prolonged winter shutdown, and solids deposition inside the pipeline. This study examined several key fluid properties of GTL, crude oil and four selected blends under TAPS operating conditions. Key measurements included Reid Vapor Pressure, density and viscosity, PVT properties, and solids deposition. Results showed that gel strength is not a significant factor for the ratios of GTL-crude oil blend mixtures (1:1; 1:2; 1:3; 1:4) tested under TAPS cold re-start conditions at temperatures above - 20 F, although Bingham fluid flow characteristics exhibited by the blends at low temperatures indicate high pumping power requirements following prolonged shutdown. Solids deposition is a major concern for all studied blends. For the commingled flow profile studied, decreased throughput can result in increased and more rapid solid deposition along the pipe wall, resulting in more frequent pigging of the pipeline or, if left unchecked, pipeline corrosion.

  7. Algorithms for near real-time detection of gas leaks from buried pipelines using hyperspectral imagery

    Science.gov (United States)

    Hoffmann, G. D.; Silver, E. A.; Pickles, W.; Male, E.

    2009-12-01

    Gas leaks from buried pipelines can directly impact the health of overlying vegetation. The leak can produce patches of highly stressed or dead vegetation. Plant health can be assessed remotely by measuring the depth of the chlorophyll absorption, which is located between 550 nm and 700 nm in reflectance imagery. Chlorophyll absorption is readily recognizable in multispectral and hyperspectral imagery as a strong absorption band centered on red light (typically 680 nm wavelength). We have examined several methods of measuring chlorophyll absorption with the goal of automating vegetation stress detection above underground pipelines in order to facilitate same-day detection of potential pipeline leak locations. One method, in which we measure vegetation stress as the ratio of the measured reflectance at peak absorption to the spectral continuum, was particularly successful. We compare the results of this measurement with a manual analysis of 0.18 m resolution imagery of several controlled CO2 leaks, finding the automatic analysis to be robust. High spatial resolution is shown to greatly increase the quality of the results, however, we show that this method works in even 3 m resolution imagery of an underground pipeline methane leak. This algorithm runs very quickly for large images. We are developing the image analysis algorithm to operate in real-time while flying buried pipeline right of way with hyperspectral sensors.

  8. Identification and assessment of trace contaminants associated with oil and gas pipelines abandoned in place

    Energy Technology Data Exchange (ETDEWEB)

    Thorne, W.E.R.; Basso, A.C.; Dhol, S.K. [Biophilia Inc., Calgary, Alberta (Canada)

    1996-12-31

    As more Alberta oil and gas fields become depleted, attention is being given to development of economically and environmentally sound abandonment procedures. The objective of this study was to identify and assess residual internal and external contaminants associated with abandoned pipelines, particularly those to be abandoned in place. Circumstances which might increase the risk of contaminant release, and other issues relating to residual pipeline contaminants, were also identified. It was found that there are thousands of different substances which could potentially be associated with abandoned pipelines. A wide range in the potential quantities of residual contaminants was also found. Of the issues identified, the effectiveness of pipeline pigging and cleaning procedures prior to abandonment was the most critical determinant of the potential quantities of residual contaminants. However, a number of trace contaminants, such as PCBs (Polychlorinated Biphenyls) and NORMs (Naturally Occurring Radioactive Materials) may remain after thorough cleaning. A brief review of the legislation and regulations from a number of jurisdictions shows that pipeline abandonment has only recently become an issue of concern. Regulations specific to abandonment are lacking, and more general regulations and guidelines are being applied on a contaminant-specific basis, or in terms of waste disposal requirements.

  9. GIS (Geographic Information Systems) based automatic tool for selection of gas pipeline corridors

    Energy Technology Data Exchange (ETDEWEB)

    Matos, Denise F.; Menezes, Paulo Cesar P.; Paz, Luciana R.L.; Garcia, Katia C.; Cruz, Cristiane B.; Pires, Silvia H.M.; Damazio, Jorge M.; Medeiros, Alexandre M.

    2009-07-01

    This paper describes a methodology developed to build total accumulated surfaces in order to better select gas pipelines corridor alternatives. The methodology is based on the minimization of negative impacts and the use of Geographic Information Systems (GIS), allowing an automatic method of construction, evaluation and selection of alternatives, that will contribute to the decision making process. It is important to emphasize that this paper follows the assumptions presented on the research reports of a project sponsored by the Ministry of Mines and Energy (MME) and elaborated at the Electric Power Research Center (CEPEL), called 'Development of a Geographic Information System to Oil and Gas Sectors in Brazil', and also the studies d GTW Project (Gas to Wire). Gas pipelines, as for their linear characteristic, may cross a variety of habitats and settlements, increasing the complexity of their environmental management. Considering this reality, this paper presents a methodology that takes into account different environmental criteria (layers), according to the area impacted. From the synthesis of the criteria it is presented the total accumulated surface. It is showed an example of a hypothetical gas pipeline connection between two points using the total accumulated surface. To select the 'impact scores' of the features, the gas pipeline was considered as a linear feature, but the result is a region, formed by pixels, each pixel with an accumulated impact score lower than some arbitrary measure. This region is called 'corridor', and it is the final result obtained using the proposed methodology. (author)

  10. 长输天然气管道泄漏回收研究%Research on Recovery of Natural Gas in Pipeline During Long-Distance Pipeline Leakage

    Institute of Scientific and Technical Information of China (English)

    马焱; 刘德俊; 李小月; 高钊; 王芙; 高吉庆; 孙皓

    2013-01-01

    长输天然气管道作为重要的能源运输工具,在保障安全高效性输送的同时,全面拉动了我国天然气城市化进程。国内处理管道泄露问题时,通常先放空管道内天然气再进行抢修工作,这样就造成了对天然气的大量浪费。设计了一套对长输管道放空天然气进行回收的车载压缩机组,并进行经济可行性分析。当发生泄露后,车量迅速到达截断阀室现场,将泄露段天然气回收注入至下一段管道,既节约能源,又减少了由于放空天然气带来的环境污染。%As important energy transportation means, the long-distance natural gas pipeline promotes the natural gas urbanization process in China as it can ensure safe efficiency natural gas transmission. When dealing with the problem of pipeline leak in China, natural gas in the pipeline is usually vented before carrying out the repair work,which can cause a lot of waste of natural gas. A set of vehicle compressor was designed, it can recover natural gas in long distance pipeline, and its economic feasibility was analyzed. When a leak occurs, recycling car will quickly reach the cut-off valve room scene, recycle natural gas of leak section and inject it into the next section of pipeline. It can save energy, and reduce the environmental pollution caused by venting natural gas.

  11. Natural gas and CO2 price variation: impact on the relative cost-efficiency of LNG and pipelines.

    Science.gov (United States)

    Ulvestad, Marte; Overland, Indra

    2012-06-01

    THIS ARTICLE DEVELOPS A FORMAL MODEL FOR COMPARING THE COST STRUCTURE OF THE TWO MAIN TRANSPORT OPTIONS FOR NATURAL GAS: liquefied natural gas (LNG) and pipelines. In particular, it evaluates how variations in the prices of natural gas and greenhouse gas emissions affect the relative cost-efficiency of these two options. Natural gas is often promoted as the most environmentally friendly of all fossil fuels, and LNG as a modern and efficient way of transporting it. Some research has been carried out into the local environmental impact of LNG facilities, but almost none into aspects related to climate change. This paper concludes that at current price levels for natural gas and CO2 emissions the distance from field to consumer and the volume of natural gas transported are the main determinants of transport costs. The pricing of natural gas and greenhouse emissions influence the relative cost-efficiency of LNG and pipeline transport, but only to a limited degree at current price levels. Because more energy is required for the LNG process (especially for fuelling the liquefaction process) than for pipelines at distances below 9100 km, LNG is more exposed to variability in the price of natural gas and greenhouse gas emissions up to this distance. If the prices of natural gas and/or greenhouse gas emission rise dramatically in the future, this will affect the choice between pipelines and LNG. Such a price increase will be favourable for pipelines relative to LNG.

  12. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reports by natural gas..., NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.9 Reports by natural gas pipeline companies on service interruptions and damage to facilities. (a)(1) Every natural gas company must report to...

  13. Investigations of pipeline reactions to detonations of radiolysis gas

    International Nuclear Information System (INIS)

    As a case of damage in a head spray cooling piping of a boiling-water reactor showed, detonations of radiolysis gas in safety-relevant tubes of nuclear power plants cannot be excluded in all cases. Radiolysis gas is a mixture of gaseous hydrogen and oxygen in stoichiometric ratio which is generated by dissociation of water under the influence of gamma and neutron radiation. Within the scope of a research project funded by the Federal Ministry of Economics and Technology (BMWi) the basis for the assessment of the related risk potential for plant operation shall, among others, be provided. Due to the high-rate response of the pipe to the detonation, multiple longitudinal cracks and fragmentation can occur. Detonation tests and numerical evaluations are performed to simulate detonations of radiolysis gas in thin-walled pipes. The radiolysis gas is simulated by mixing hydrogen and oxygen from gas bottles. Pipes made of austenitic steel with the nominal dimensions of OD x t = 114,30 mm x 6,02 mm are used for the tests. The internal pressure is 70 bar in all cases. In different tests, which are carried out at room temperature, the ratio of radiolysis gas in the pipe is varied and for the simulation of steam nitrogen is used as another filling medium. Next to the results of three detonation tests with a radiolysis gas ratio of 60% and 80% the results of tests, carried out for the experimental evaluation of the radiolysis gas reactions, with thick-walled vessels are presented. (orig.)

  14. Hydrogen gas explosions in pipelines - modeling and experimental investigations

    OpenAIRE

    Knudsen, Vegeir

    2007-01-01

    Gas explosions in closed pipes with a single obstacle have been investigated both numerically and experimentally. Most of the work is related to hydrogen and air mixtures, but other fuels have also been used. At the present time there does not exist a software tool or a numerical method that single-handedly can cover the whole range of phenomena in gas explosions. Computational fluid dynamics is also a developing field, even for fluid flow without chemical reactions. The objective of this wor...

  15. 77 FR 43586 - Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment...

    Science.gov (United States)

    2012-07-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Line V Pipeline Retirement Project and Request for Comments On Environmental Issues The staff of...

  16. Designing a reliable leak bio-detection system for natural gas pipelines

    International Nuclear Information System (INIS)

    Monitoring of natural gas (NG) pipelines is an important task for economical/safety operation, loss prevention and environmental protection. Timely and reliable leak detection of gas pipeline, therefore, plays a key role in the overall integrity management for the pipeline system. Owing to the various limitations of the currently available techniques and the surveillance area that needs to be covered, the research on new detector systems is still thriving. Biosensors are worldwide considered as a niche technology in the environmental market, since they afford the desired detector capabilities at low cost, provided they have been properly designed/developed and rationally placed/networked/maintained by the aid of operational research techniques. This paper addresses NG leakage surveillance through a robust cooperative/synergistic scheme between biosensors and conventional detector systems; the network is validated in situ and optimized in order to provide reliable information at the required granularity level. The proposed scheme is substantiated through a knowledge based approach and relies on Fuzzy Multicriteria Analysis (FMCA), for selecting the best biosensor design that suits both, the target analyte and the operational micro-environment. This approach is illustrated in the design of leak surveying over a pipeline network in Greece.

  17. Designing a reliable leak bio-detection system for natural gas pipelines.

    Science.gov (United States)

    Batzias, F A; Siontorou, C G; Spanidis, P-M P

    2011-02-15

    Monitoring of natural gas (NG) pipelines is an important task for economical/safety operation, loss prevention and environmental protection. Timely and reliable leak detection of gas pipeline, therefore, plays a key role in the overall integrity management for the pipeline system. Owing to the various limitations of the currently available techniques and the surveillance area that needs to be covered, the research on new detector systems is still thriving. Biosensors are worldwide considered as a niche technology in the environmental market, since they afford the desired detector capabilities at low cost, provided they have been properly designed/developed and rationally placed/networked/maintained by the aid of operational research techniques. This paper addresses NG leakage surveillance through a robust cooperative/synergistic scheme between biosensors and conventional detector systems; the network is validated in situ and optimized in order to provide reliable information at the required granularity level. The proposed scheme is substantiated through a knowledge based approach and relies on Fuzzy Multicriteria Analysis (FMCA), for selecting the best biosensor design that suits both, the target analyte and the operational micro-environment. This approach is illustrated in the design of leak surveying over a pipeline network in Greece. PMID:21177031

  18. An Experimental Simulation of Load-Leveling Through Adsorption for Natural Gas Pipeline System

    Institute of Scientific and Technical Information of China (English)

    周理; 陈海华

    2002-01-01

    A lo9adleveling method through adsorption was presented to adjust the supply quantity according to the consumption rate of natural gas with time,An experimental simulation set up was designed and used to test the load-leveling function for a real pipline system.A storage tank filled with activated carbon together with a filter constitutes the major part of the load-leveling facility,Pressure and temperature of the system,as well as the real gas output of the storage tank were recorded.It is proven that load-leveling by adsorption in technically feasible even for low pipeline pressure of natural gas supply system.

  19. Study and Application of Internal Coating Technique to Drag Reduction of the Trunk Pipeline for the West-East Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    HuShixin; QuShenyang; LinZhu

    2004-01-01

    Coverage layer coated in the internal wall of pipeline enables the friction drag to be reduced, the throughput and the gas transmission efficiency to be increased, the frequency of pigging and the number of the intermediate compressor station to be reduced, and the power consumption of the compressor to be decreased etc. The drag reduction is a high advanced scientific technique with outstanding economical benefit. The study and application of internal coating technique for drag reduction of 4000km trunk pipeline in West-East gas transmission pipeline (WEGTP) project are described, in which the main points are the drag reduction principle, coating process and the indoor study of this technique with own-decided knowledge property right at home.

  20. Friction factor in smooth and rough gas pipelines. An experimental study

    Energy Technology Data Exchange (ETDEWEB)

    Sletfjerding, Elling

    1999-01-01

    Flow of high pressure natural gas in pipelines has been studied experimentally. Pipeline flow of natural gas is characterized by high Reynolds numbers due to the low viscosity and relatively high density of pressurized gas. Friction factor correlations for high Reynolds number flow in smooth and rough pipes were developed. To study the effect of wall roughness on pipe flow at high Reynolds numbers 8 test pipes with different wall roughness were fabricated. The wall roughness in 6 of the test pipes was varied by adding glass beads in an epoxy coating applied on the pipe wall. One test pipe was treated with a smooth epoxy coating and one was left untreated. The inner diameter of the test pipes was 150 mm. Measurements of the pressure drop in the pipes were made in a closed flow loop at line pressures of 25, 70, 95 and 120 bar. The Reynolds number of the flow was varied in the range 2-30 million. The wall roughness of the test pipes was measured with a stylus instrument. Correlations between the directly measured wall roughness and the friction factor at fully rough flow conditions were presented. To characterize the wall roughness of the test pipes a parameter combining a measure of the roughness height (R{sub q}) and the texture of the wall roughness was used. Due to the high Reynolds number of the flow, minute irregularities of the pipe wall had significant effect on the friction factor in the pipe. The measured wall roughness of the test pipes was in the range 1.4 < R{sub q} <31 (my)m. The flow experiments in test pipes was compared with data from operating pipelines in the North Sea. The offshore pipelines are coated with the same epoxy coating as used in the test pipes. The friction factor in coated offshore gas pipelines showed smooth behavior when the additional pressure drop due to welds were accounted for. The study of coated gas pipelines showed that the friction factor was significantly lower than predicted by standard correlations.

  1. Considerations about the Urucu-Manaus gas pipeline design; Consideracoes sobre o projeto do gasoduto Urucu-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Villela, Claudio Henrique Lobianco G.; Correia, Luiz de Carvalho Dias [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The main purpose of this job is to present the characteristics that influenced the elaboration of the Urucu-Manaus Gas Pipeline Project and the difference between this pipeline and other pipelines already installed on the Amazon region. In this project were emphasized the aspects related to the route definition, mapping technologies that had not been utilized in our pipeline projects, the crossing of vast flooded areas, requiring specific studies, as well the minimization of the environment impacts, in this case the existence of animal species present only in this region. Other differential factor was the Rio Negro crossing, where the pipeline will be installed in the riverbed. The know-how attained with this project consolidates ever so the activity of building pipelines in tropical forest regions. (author)

  2. Dynamic behaviour of high-pressure natural-gas flow in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gato, L.M.C. [Department of Mechanical Engineering, Instituto Superior Tecnico, Technical University of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon (Portugal)]. E-mail: lgato@mail.ist.utl.pt; Henriques, J.C.C. [Department of Mechanical Engineering, Instituto Superior Tecnico, Technical University of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon (Portugal)]. E-mail: jcch@mail.ist.utl.pt

    2005-10-01

    The aim of the present study is the numerical modelling of the dynamic behaviour of high-pressure natural-gas flow in pipelines. The numerical simulation was performed by solving the conservation equations, for one-dimensional compressible flow, using the Runge-Kutta discontinuous Galerkin method, with third-order approximation in space and time. The boundary conditions were imposed using a new weak formulation based on the characteristic variables. The occurrence of pressure oscillations in natural-gas pipelines was studied as a result of the compression wave originated by the rapid closure of downstream shut-off valves. The effect of the partial reflection of pressure waves was also analyzed in the transition between pipes of different cross-sectional areas.

  3. Application of four dimensional matrix for thermal analysis of Slovak transit gas pipeline by program FENIX

    Science.gov (United States)

    Széplaky, Dávid; Varga, Augustín

    2016-06-01

    The contribution describes the principle of the FENIX program operation, which was designed to determine the temperature field of the transit pipeline for the transportation of natural gas. The program itself consists of several modules which are reciprocally linked. The basis of the program is the elementary balance method by means of which the unsteady heat transfer is assigned in several layers in different directions. The first step was to assess both the pressure and temperature of the natural gas mode, the second step is to determine the heat transfer through the walls of the pipes, and the last one is to determine the distribution of the temperature field in the surroundings of the pipeline.

  4. Natural Gas Pipeline Replacement Programs Reduce Methane Leaks and Improve Consumer Safety

    Science.gov (United States)

    Jackson, R. B.

    2015-12-01

    From production through distribution, oil and natural gas infrastructure provide the largest source of anthropogenic methane in the U.S. and the second largest globally. To examine the prevalence of natural gas leaks downstream in distribution systems, we mapped methane leaks across 595, 750, and 247 road miles of three U.S. cities—Durham, NC, Cincinnati, OH, and Manhattan, NY, respectively—at different stages of pipeline replacement of cast iron and other older materials. We compare results with those for two cities we mapped previously, Boston and Washington, D.C. Overall, cities with pipeline replacement programs have considerably fewer leaks per mile than cities without such programs. Similar programs around the world should provide additional environmental, economic, and consumer safety benefits.

  5. Phylogenetic characterization of a corrosive consortium isolated from a sour gas pipeline.

    Science.gov (United States)

    Jan-Roblero, J; Romero, J M; Amaya, M; Le Borgne, S

    2004-06-01

    Biocorrosion is a common problem in oil and gas industry facilities. Characterization of the microbial populations responsible for biocorrosion and the interactions between different microorganisms with metallic surfaces is required in order to implement efficient monitoring and control strategies. Denaturing gradient gel electrophoresis (DGGE) analysis was used to separate PCR products and sequence analysis revealed the bacterial composition of a consortium obtained from a sour gas pipeline in the Gulf of Mexico. Only one species of sulfate-reducing bacteria (SRB) was detected in this consortium. The rest of the population consisted of enteric bacteria with different characteristics and metabolic capabilities potentially related to biocorrosion. Therefore, several types of bacteria may be involved in biocorrosion arising from natural biofilms that develop in industrial facilities. The low abundance of the detected SRB was evidenced by environmental scanning electron microscopy (ESEM). In addition, the localized corrosion of pipeline steel in the presence of the consortium was clearly observed by ESEM after removing the adhered bacteria.

  6. Fuzzy Reliability Analysis for Seabed Oil-Gas Pipeline Networks Under Earthquakes

    Institute of Scientific and Technical Information of China (English)

    刘震; 潘斌

    2003-01-01

    The seabed oil-gas pipeline network is simplified to a network w i th stochastic edge-weight by means of the fuzzy graphics theory. With the help o f network analysis, fuzzy mathematics, and stochastic theory, the problem of rel iability analysis for the seabed oil-gas pipeline network under earthquakes is t ransformed into the calculation of the transitive closure of fuzzy matrix of the stochastic fuzzy network. In classical network reliability analysis, the node i s supposed to be non-invalidated; in this paper, this premise is modified by in t roducing a disposal method which has taken the possible invalidated node into a ccount. A good result is obtained by use of the Monte Carlo simulation analysis.

  7. Gas Pipelines, LP and LNG, pipedigitized, Published in 2000, 1:24000 (1in=2000ft) scale, Carbon County GIS.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Gas Pipelines, LP and LNG dataset, published at 1:24000 (1in=2000ft) scale, was produced all or in part from Other information as of 2000. It is described as...

  8. Interpreting concentration indices in the secondary market for natural gas transportation: The implication of pipeline residual rights

    International Nuclear Information System (INIS)

    In 1992, the U.S. Federal Energy Regulatory Commission created a secondary market for natural gas transportation whereby shippers holding firm transportation capacity on interstate natural gas pipelines can compete with the pipeline in the provision of transportation services. However, if a shipper does not use some of its contracted firm transportation capacity, the pipeline can resell that capacity as interruptible transportation. That is, the pipeline has residual rights with respect to firm transportation capacity contracted for by shippers. We demonstrate that these residual rights can have a significant effect on the competitiveness of the secondary market for natural gas transportation. A consequence of these residual rights is that the secondary market for natural gas transportation may be considerably more competitive than indicated by measures of concentration like the widely used Herfindahl-Hirschman Index. (author)

  9. Gas Pipelines, LP and LNG, Published in 1997, 1:4800 (1in=400ft) scale, County of Lexington.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Gas Pipelines, LP and LNG dataset, published at 1:4800 (1in=400ft) scale, was produced all or in part from Orthoimagery information as of 1997. Data by this...

  10. 78 FR 65637 - Sierrita Gas Pipeline LLC; Notice of Availability of the Draft Environmental Impact Statement for...

    Science.gov (United States)

    2013-11-01

    ...-inch-diameter natural gas pipeline in Pima County, Arizona; two meter stations; two pig launchers and two pig receivers; \\1\\ and \\1\\ A pig is an internal tool that can be used to clean and dry a...

  11. Dry Hyperbaric Gas Metal Arc Welding of Subsea Pipelines : Experiments and Modeling

    OpenAIRE

    Azar, Amin S.

    2012-01-01

    Ambitions in exploration of oil and gas fields at deeper water depth require continuous investigation and maintenance. The transportation pipelines laid in deep waters are both subjected to corrosion and buckling due to environmental phenomena. They may also often undergo branching (namely hot tapping) to redirect (or add to) the transportation paths. Mechanical joints and welding are both considered as available alternatives when sectioning and replacement of the pipes at shallow waters is n...

  12. Russian energy imperialism : the world maped along the gas pipelines

    OpenAIRE

    Baločkaitė, Rasa

    2012-01-01

    Energy imperialism refers to the use of natural resources for political purposes, i.e. weaponization of energy. At the state level, it means specific institutional structure, as the state building is predetermined by oil led developments. At the international level, it means international nets of energy dependency, centered around the mother state possessing oil, gas and other natural resources. In a paradox way, the so called Western world (Western Europe and North America) becomes increasin...

  13. Odourisation of CO2 pipelines in the UK: historical and current impacts of smell during gas transport

    OpenAIRE

    Kilgallon, Rachel; Gilfillan, Stuart; Haszeldine, Stuart; McDermott, Christoper

    2015-01-01

    Commercial scale Carbon Capture and Storage (CCS) will require CO2 to be transported from industrial point sources to storage sites, potentially over distances of hundreds of kilometres. One of the most efficient means of transporting fluids over large distances is via pipeline. Pipeline leaks can be problematic, especially when transporting colourless and odourless gases such as natural gas and CO2. One of the current methods of risk mitigation for natural gas transport is odourisation. The ...

  14. Application of groundwater aggressiveness assessment method for estimation of the karst process at main gas pipeline construction

    Science.gov (United States)

    Ermolaeva, A. V.

    2016-03-01

    Main pipelines maintenance is connected with hazard engineering and geological working conditions. The article deals with the use of groundwater aggressiveness assessment method to estimate the karst processes development during the construction of main gas pipelines. The possibility of using this method is analyzed on the example of the initial section of the designed gas pipeline “Power of Siberia” (section “Chayanda-Lensk"). The calculation of the nonequilibrium index Ca was made in accordance with the geotechnical survey data. The dependencies between the geomorphological features of the terrain and the natural waters aggressiveness were determined.

  15. Rejection of seamless pipe noise in magnetic flux leakage data obtained from gas pipeline inspection

    Science.gov (United States)

    Afzal, Muhammad; Udpa, Satish; Udpa, Lalita; Lord, William

    2000-05-01

    Natural gas is traditionally transmitted from production facilities to customer locations through a vast pipeline network. A major segment of this network employs seamless pipes. This is especially true for smaller diameter transmission and distribution lines. Manufacturing process associated with the production of seamless pipes contribute to a helical variation in the pipe along the axis. The deformation introduces an artifact in the data obtained from MFL inspection of these pipelines. This seamless pipe noise is usually correlated with signals generated by defects and other elements (joints, tees, etc.) in pipelines, and can therefore, mask their indications in MFL data. This warrants the need for methods to improve signal-to-noise ratio (SNR) in MFL data from seamless pipes. This paper presents a technique for detecting signals in MFL data from seamless pipes. The approach processes the data in various steps. First, a wavelet based denoising technique is applied to reduce the noise due to instrumentation and other sources. An adaptive filtering approach is then applied to reject seamless noise in the data. Since the inspection of pipelines typically generates vast amounts of data, it is imperative that the algorithm be computationally efficient. The processing method has to be robust in that it should be data independent. The approach described in this paper meet these criteria. Results from application of the approach to data from field tests are presented.

  16. A Robust Bayesian Approach to an Optimal Replacement Policy for Gas Pipelines

    Directory of Open Access Journals (Sweden)

    José Pablo Arias-Nicolás

    2015-06-01

    Full Text Available In the paper, we address Bayesian sensitivity issues when integrating experts’ judgments with available historical data in a case study about strategies for the preventive maintenance of low-pressure cast iron pipelines in an urban gas distribution network. We are interested in replacement priorities, as determined by the failure rates of pipelines deployed under different conditions. We relax the assumptions, made in previous papers, about the prior distributions on the failure rates and study changes in replacement priorities under different choices of generalized moment-constrained classes of priors. We focus on the set of non-dominated actions, and among them, we propose the least sensitive action as the optimal choice to rank different classes of pipelines, providing a sound approach to the sensitivity problem. Moreover, we are also interested in determining which classes have a failure rate exceeding a given acceptable value, considered as the threshold determining no need for replacement. Graphical tools are introduced to help decisionmakers to determine if pipelines are to be replaced and the corresponding priorities.

  17. Automation and high-efficiency of welding in pipeline; Gas pipeline ni okeru yosetsu no jidoka to konoritsuka

    Energy Technology Data Exchange (ETDEWEB)

    Kawanishi, N.; Masuda, H.; Hara, Y.; Kimura, M. [Osaka Gas Co. Ltd., Osaka (Japan); Iimura, M. [Tokyo Gas Co. Ltd., Tokyo (Japan); Hayashi, K. [Toho Gas Co. Ltd., Nagoya (Japan); Mori, K.; Suesawa, S. [Japan Gas Association, Tokyo (Japan)

    1997-11-01

    With objectives to develop technologies which can perform a welding work automatically at ultra-high speed, improve efficiency in construction works of building town gas transporting pipelines, and make the welding quality uniform, a program that will last for six years has been established to make necessary discussions. Using a horizontally fixed pipe, AP15L-X65, with a diameter of 750 mm and a plate thickness of 19 mm as the object of the discussions, the following four welding processes were selected to implement the development on each process in parallel: high-speed TIG welding, high-speed oscillating MAG welding, plasma welding, and electron beam welding. In March 1997 by which the former half of the project has been completed, an arc time of less than 30 minutes has been achieved as one of the development targets. Using sizes of problems in innovativeness in technologies, welding quality, and practical application as criteria for an interim evaluation, focuses were directed on four technologies. As a result, the electron beam welding was selected, which has achieved an epoch-making result in arc time while maintaining good quality. In the latter half of the project which will end in March 2000, promotion efforts will be continued for discussing how to solve problems in electron beam welding machines, and making developments and field tests thereon. 7 refs., 20 figs., 5 tabs.

  18. Qualification strategy for Fast-Pipetm for high pressure gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Salama, Mamdouh M. [ConocoPhillips Company, Houston, Texas (United States)

    2010-07-01

    High strength pipeline steels have been developed to transport gas and oil for very long distances and under difficult conditions. The manufacture of large diameter high pressure pipelines is a challenge. This report presents the qualification results and cost evaluation of the Fast-PipeTM concept, which uses hoop winding dry glass fiberglass to provide the required high pressure capacity. This paper explains the concept of the Fast-PipeTM, a detailed qualification program, and a risk analysis. The qualification program is presented in fifteen points, from the analytical models to predict pressure and bending strain capacities to the demonstration of repair procedures. This report finds that the results of the qualification cost evaluation of the Fast-PipeTM concept demonstrate the feasibility of the concept for use in high pressure gas pipelines as an alternative to high strength steels. It highlighted the simplicity in manufacturing and construction, the weld cap efficiency and also presents some issues relating to damage tolerance.

  19. Tunnel construction used as solution for the Cabiunas-REDUC-3 gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    D' Oliveira, Celso A.; Teixeira, Andre N. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The construction of tunnels for pipeline routes has started being adopted as a solution for technical, environmental and safety issues in the oil and gas industry. Although it is not yet a common practice, PETROBRAS decided to use this type of construction on part of 178 extension kilometers of the main line for the Cabiunas-REDUC-3 Gas Pipeline located in the Gavioes mountains in the district of Cachoeiras de Macacu (RJ). The project implementation follows a growing trend of combining efficiency and environmental protection during its execution. Because the region is full of steep grades and is located in an environmentally sensitive area, the use of a tunnel connection removes some of the risks associated with that type of terrain. Among the many technical challenges involved in the project, one must include: access through dense forest, moving personnel, building material and equipment over step terrain and providing protection from corrosion. And as far as protecting the environment is concerned, the use of a pipeline results in a significant reduction in the loss of native vegetation and damage to the ecosystem. To increase these advantages, PETROBRAS seeks to adopt the kinds of construction methods that are most adequate for the challenge at hand, while producing the best results for the project. Whether using new or tried-and-true methods, the focus is always on perfecting the quality of service provided. (author)

  20. Geological, geotechnical and hydrogeological setting of a gas pipeline failure near Brandon, Manitoba

    Energy Technology Data Exchange (ETDEWEB)

    Penner, L.; Mollard, G. [J.D. Mollard and Associates Ltd., Regina, SK (Canada); Holm, M. [AMEC, Regina, SK (Canada); Sutherby, R. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2003-07-01

    An in-service pipeline failure occurred on the TransCanada main line gas pipeline approximately 50 kilometres northeast of Brandon, Manitoba, on April 14, 2002. After a metallurgical analysis was performed, it was determined that the likely cause of the failure was stress corrosion cracking (SCC) of the near-neutral pH form, with the failure occurring on a 36-inch diameter high pressure natural gas pipeline. In addition, failures on the pipe and a failure location near the boundary between a till plain and a glaciodeltaic sand plain, seemed to indicate that the local environment influenced the failure mechanism. A study was initiated in June 2002 to help define the geoenvironmental conditions associated with the failure site and to investigate possible links between the failure mechanism and the site conditions. The study involved an airphoto and map study, a field study, and an assessment of geological and hydrogeological factors. The results of the study were presented and discussed. 7 refs., 1 tab., 10 figs.

  1. Numerical simulation of stress and deformation of in-service welding onto gas pipeline

    Institute of Scientific and Technical Information of China (English)

    Chen Yuhua; Wang Yong; Han Bin; Wang Zhengfang

    2006-01-01

    SYSWELD was used to simulate in-service welding process of gas pipeline of X70 pipeline steel. Welding thermal cycle, stress and deformation of in-service welded joint were studied. The results show that peak temperature of coarse grain heat-affected zone (CGHAZ) of in-service welding onto gas pipeline is the same with routine welding, but t8/5 ,t8/3 and t8/1 decrease at certain degree. For the zone near welded seam, axial stress and hoop stress in the inner pipe wall are compressive stress when welding source passes through the cross-section that is studied, but residual axial stress and residual hoop stress after welded are all tensile stress. Transient deformation and residual deformation are all convex deformation compared with the original pipe diameter size. Deformation achieves maximum when welding thermal source passes through the cross-section that is studied and then decreases during the cooling process after welding.

  2. An approach to coating and cathodic protection design on long distance gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Bacchi, L.; Brugnetti, F.; Zanardo, F. [Snam Rete Gas, Milan (Italy); Castano, M. [Eni Gas and Power Div., Milan (Italy)

    2004-07-01

    This paper provided details of a pilot gas pipeline using X100 grade steel planned as part of the TAP project in Italy. The full-scale experimental line is located at a military base in Sardinia, and is comprised of two 48-inch diameter buried pipelines which extend for approximately 700 m. One of the lines is coated, has good cathodic protection (CP) and no mechanical damage. The other line has been mechanically damaged and has artificial defects in the pipe coating as well as areas that are subjected to bacteria cultures. The damaged line has also been divided into 3 parts that are protected with different levels of cathodic protection. The aim of the project is to examine the pipeline's susceptibility to environmentally assisted cracking, hydrogen embrittlement, and near-neutral stress corrosion cracking. A full scale burst test will be conducted on the undamaged line in order to analyze the mechanical behaviour of high-grade steel in optimal conditions. Three layer high density polyethylene (HDPE) and dual layer fusion bond epoxy lining are being considered by the project, which also aims to investigate the performance of field joint coatings. The project is also investigating power generation systems for CP. The CP systems will be monitored by periodic visits from technical operators as well as with the use of telemetry and remote control systems. Reference electrodes will be used to monitor the CP level of the pilot pipelines. A Cu-CuSO{sub 4} electrode will be used to monitor soil resistivity. It was concluded that the project will provide information concerning the reliability and duration of experimental electrodes, as well as the life cycle costs of corrosion protection in long-distance pipelines. 1 ref., 6 tabs., 3 figs.

  3. Gas Pipeline Transportation: Competing within Ex-Ante Increasing Returns to Scale and Sunk Costs Gas Pipeline Transportation: Competing within Ex-Ante Increasing Returns to Scale and Sunk Costs

    Directory of Open Access Journals (Sweden)

    Ricardo Raineri

    1997-03-01

    Full Text Available In the present decade the Chilean economy has witnessed a vigorous development in the natural gas industry, with cruel battles among competing corporations that look for the success of their gas pipeline projects. This paper analyzes industrial organization implications of gas pipeline transportation technology providing a theoretical foundation for what current believes on natural monopoly's saw as impossible: three gas wars and one gas-electric war. There are two key components that determine the capacity of a gas pipeline: ex-ante increasing returns to scale, and the commitment value of sunk costs, Contrarily to the standard paradigm on natural monopolies, it is shown that ex-ante increasing returns to scale with sunk costs are not sufficient to preclude entry by competing firms, implying that the scale economy in the natural gas pipeline industry does not make it a natural monopoly. Welfare analysis show that strategic entry deterrence has a positive effect on welfare, effect that results from the threat that the potential intruders impose on the incumbent firm. In the present decade the Chilean economy has witnessed a vigorous development in the natural gas industry, with cruel battles among competing corporations that look for the success of their gas pipeline projects. This paper analyzes industrial organization implications of gas pipeline transportation technology providing a theoretical foundation for what current believes on natural monopoly's saw as impossible: three gas wars and one gas-electric war. There are two key components that determine the capacity of a gas pipeline: ex-ante increasing returns to scale, and the commitment value of sunk costs, Contrarily to the standard paradigm on natural monopolies, it is shown that ex-ante increasing returns to scale with sunk costs are not sufficient to preclude entry by competing firms, implying that the scale economy in the natural gas pipeline industry does not make it a natural

  4. Cost Minimization Model of Gas Transmission Line for Indonesian SIJ Pipeline Network

    Directory of Open Access Journals (Sweden)

    Septoratno Siregar

    2003-05-01

    Full Text Available Optimization of Indonesian SIJ gas pipeline network is being discussed here. Optimum pipe diameters together with the corresponding pressure distribution are obtained from minimization of total cost function consisting of investment and operating costs and subjects to some physical (Panhandle A and Panhandle B equations constraints. Iteration technique based on Generalized Steepest-Descent and fourth order Runge-Kutta method are used here. The resulting diameters from this continuous optimization are then rounded to the closest available discrete sizes. We have also calculated toll fee along each segment and safety factor of the network by determining the pipe wall thickness, using ANSI B31.8 standard. Sensitivity analysis of toll fee for variation of flow rates is shown here. The result will gives the diameter and compressor size and compressor location that feasible to use for the SIJ pipeline project. The Result also indicates that the east route cost relatively less expensive than the west cost.

  5. Evaluating the economic impacts of pipeline useage on the Texas oil & gas supply chain

    Science.gov (United States)

    Singh, Jashandeep

    The objective of this dissertation is to find the minimum supply chain cost for the Texas oil and gas industry, when pipeline is used as the major mode of transporting oil. The problem is solved, by introducing a mixed -- integer linear programming model which will help in taking the necessary decisions based on the cost estimates for various scenarios. In order to meet the objective, specific objectives were put down to evaluate their impacts. First was to evaluate the economic impact of mode of transport and the infrastructure second was to evaluate the economic impact of refinery flow. Finally this dissertation aims at the mixed -- integer programming model to demonstrate the economic impacts of pipeline usage on the supply chain.

  6. Web-based continuous internal corrosion monitoring of a sweet natural gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Cauchi, Sam; Vorozcovs, Andrew [Fiber Optic Systems Technology Inc. (FOX-TEK), Bedford, Nova Scotia (Canada)

    2009-07-01

    Inspection of pipelines susceptible to internal corrosion is a key ingredient in maintaining their reliable throughput. While conventional inspection consisting of in line inspection, radiography and ultrasound remain the mainstay of most integrity programs, challenging circumstances in some cases make the availability of such data inadequate, cost prohibitive, and at times entirely unavailable. These scenarios include aggressive internal corrosion, expensive excavation conditions, low or stagnant flow, and non-piggable pipeline segments. While some gas pipelines in these circumstances are considered relatively low risk and low consequence, due to the significant reclamation costs and cleanup time associated with liquid pipelines, those areas identified as being high-risk are often high-consequence and thus require a specialized inspection solution. For areas deemed to be at high-risk, or areas of low-risk with high consequence, Electrical Field Mapping (EFM) has provided a practical solution to safe operation without introducing expensive and potentially dangerous dig programs. Historically, however, this inspection approach has required manual data acquisition as part of a scheduled EFM site visit schedule. Due to the tedious nature of this data acquisition approach, the remoteness of some pipeline inspection sites and the complexity of data analysis, it has been difficult to closely monitor the most critical assets on a continuous basis. The manual component of this approach also often eliminates EFM as a practical solution due to lack of properly trained personnel. In this paper, we will discuss a new approach to data acquisition where data is acquired, transmitted, analyzed, and displayed completely automatically and remotely with virtually no human overhead or recurring operating costs. An overview of the PinPoint monitoring setup covering 180 degrees of pipe circumference is described. This advanced EFM system allows operators to observe, essentially in real

  7. Reasons For The Experimental Research Of Gas Outflows Based On The Signals Of Weak Interactions Between The Tested Model Of The Gas Pipeline, And Tested Equalizer

    Directory of Open Access Journals (Sweden)

    Rafał Grądzki

    2015-09-01

    Full Text Available This article applies diagnosing issues outflows of gas pipelines using specialized research equipment - equalizers. Variant with only two measuring devices (equalizers, arranged on the inlet and outlet of the pipeline, and the standard pressure transducers and flow rate were considered. The signals from the system and research equipment (equalizers are the basis for the development of new method to test outflow of gas pipeline, which is based on the quotient of the power spectral density of signals generated by the equalizer (diagnoser and signals measured using standard pressure transducers and flow rate. Possible use to analysis the signals power will allow go from signal diagnostic for more effective parametric diagnostic.

  8. Natural gas pipeline transportation safety countermeasures%天然气管道安全输送对策分析

    Institute of Scientific and Technical Information of China (English)

    唐平

    2016-01-01

    For natural gas pipeline transportation safety problems in the process are analyzed,and proposed to improve the level of natural gas pipeline transportation safety and effective measures designed to contribute to a healthy development of China’s natural gas industry.%针对天然气管道安全输送过程中存在的问题进行了分析,并提出了提高天然气管道安全输送水平的有效对策,旨在为我国天然气产业的健康发展贡献一份力量。

  9. Use of Polyurethane Coating to Prevent Corrosion in Oil and Gas Pipelines Transfer

    Directory of Open Access Journals (Sweden)

    Amir Samimi

    2012-12-01

    Full Text Available Corrosion is one of the major problems in the oil and gas industry is one that automatically allocates huge sums annually. Polyurethane is a thermoses polymer with various applications. Using form this polymer has spread for military applications by Otto Bayer in 1930. In one general look polyurethane is product of Iso Syanate and ploy with each other, So that: Iso + ploy = polyurethane. Spend large cost for application and launching oil and gas transitions, has cleared the necessity protection from them agonist corrosion. In this direction protection coating with specific properties such as high electricity resistance presented to market by various companies that each of them has special advantage and disadvantages. In this research has tried while analysis coatings specifications of gas and oil transitional pipelines, has compared properties and common qualities of them with each other.

  10. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  11. Impact of the Keystone XL pipeline on global oil markets and greenhouse gas emissions

    Science.gov (United States)

    Erickson, Peter; Lazarus, Michael

    2014-09-01

    Climate policy and analysis often focus on energy production and consumption, but seldom consider how energy transportation infrastructure shapes energy systems. US President Obama has recently brought these issues to the fore, stating that he would only approve the Keystone XL pipeline, connecting Canadian oil sands with US refineries and ports, if it `does not significantly exacerbate the problem of carbon pollution'. Here, we apply a simple model to understand the implications of the pipeline for greenhouse gas emissions as a function of any resulting increase in oil sands production. We find that for every barrel of increased production, global oil consumption would increase 0.6 barrels owing to the incremental decrease in global oil prices. As a result, and depending on the extent to which the pipeline leads to greater oil sands production, the net annual impact of Keystone XL could range from virtually none to 110 million tons CO2 equivalent annually. This spread is four times wider than found by the US State Department (1-27 million tons CO2e), who did not account for global oil market effects. The approach used here, common in lifecycle analysis, could also be applied to other pending fossil fuel extraction and supply infrastructure.

  12. Pigging analysis for gas-liquid two phase flow in pipelines

    International Nuclear Information System (INIS)

    A new method to analyze transient phenomena caused by pigging in gas-liquid two-phase flow is developed. During pigging, a pipeline is divided into three sections by two moving boundaries, namely the pig and the leading edge of the liquid slug in front of the pig. The basic equations are mass, momentum and energy conservation equations. The boundary conditions at the moving boundaries are determined from the mass conservation across the boundaries, etc. A finite difference method is used to solve the equations numerically. The method described above is also capable of analyzing transient two-phase flow caused by pressure and flow rate changes. Thus the over-all analysis of transient two-phase flow in pipelines becomes possible. A series of air-water two-phase flow pigging experiments was conducted using 105.3 mm diameter and 1436.5 m long test pipeline. The agreement between the measured and the calculated results is very good

  13. Simulation of non-isothermal transients in gas/condensate pipelines using TVD scheme

    Energy Technology Data Exchange (ETDEWEB)

    Dukhovnaya, Y.; Adewumi, M.A. [Pennsylvania State Univ., University Park, PA (United States). Petroleum and Natural Gas Engineering

    2000-10-05

    A non-isothermal transient flow of gas/condensate in pipelines is discussed. The main objective of the model is to predict the distribution of major parameters along the pipeline. Two-fluid model coupled with dispersed with uniform droplet size flow regime is used to describe the flow. A non-isothermal condition is incorporated to the model through energy equations written for each phase. Energy and mass transfer between the phases are taken into consideration and regarded as a source/sink terms in phases' equations. Inertia terms in the phases' momentum equations are also included. An explicit, five-point, second-order accurate total variation diminishing (TVD) scheme is formulated to solve the system of governing equations. Special attention is given to the treatment of boundary conditions at inlet and outlet of the pipeline. TVD scheme is found to preserve the shock adequately, with small dispersion effect. The obtained results are found to be quantitatively descriptive; however, they can not be quantified because of the lack of experimental data. (orig.)

  14. Hierarchical Leak Detection and Localization Method in Natural Gas Pipeline Monitoring Sensor Networks

    Directory of Open Access Journals (Sweden)

    Ning Yu

    2011-12-01

    Full Text Available In light of the problems of low recognition efficiency, high false rates and poor localization accuracy in traditional pipeline security detection technology, this paper proposes a type of hierarchical leak detection and localization method for use in natural gas pipeline monitoring sensor networks. In the signal preprocessing phase, original monitoring signals are dealt with by wavelet transform technology to extract the single mode signals as well as characteristic parameters. In the initial recognition phase, a multi-classifier model based on SVM is constructed and characteristic parameters are sent as input vectors to the multi-classifier for initial recognition. In the final decision phase, an improved evidence combination rule is designed to integrate initial recognition results for final decisions. Furthermore, a weighted average localization algorithm based on time difference of arrival is introduced for determining the leak point’s position. Experimental results illustrate that this hierarchical pipeline leak detection and localization method could effectively improve the accuracy of the leak point localization and reduce the undetected rate as well as false alarm rate.

  15. Hierarchical leak detection and localization method in natural gas pipeline monitoring sensor networks.

    Science.gov (United States)

    Wan, Jiangwen; Yu, Yang; Wu, Yinfeng; Feng, Renjian; Yu, Ning

    2012-01-01

    In light of the problems of low recognition efficiency, high false rates and poor localization accuracy in traditional pipeline security detection technology, this paper proposes a type of hierarchical leak detection and localization method for use in natural gas pipeline monitoring sensor networks. In the signal preprocessing phase, original monitoring signals are dealt with by wavelet transform technology to extract the single mode signals as well as characteristic parameters. In the initial recognition phase, a multi-classifier model based on SVM is constructed and characteristic parameters are sent as input vectors to the multi-classifier for initial recognition. In the final decision phase, an improved evidence combination rule is designed to integrate initial recognition results for final decisions. Furthermore, a weighted average localization algorithm based on time difference of arrival is introduced for determining the leak point's position. Experimental results illustrate that this hierarchical pipeline leak detection and localization method could effectively improve the accuracy of the leak point localization and reduce the undetected rate as well as false alarm rate. PMID:22368464

  16. Application of higher-order TVD resolution for investigation of transients problems in natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Ibraheem, S.O.; Adewumi, M.A. [Pennsylvania State Univ., University Park, PA (United States)

    1996-12-31

    A higher-order numerical procedure is applied to simulate typical transient phenomena in natural gas transportation. Reliable modeling and prediction of transients features in transmission pipelines are desirable for optimal control of gas deliverability, design and implementation of active controls, and modeling of operational behavior of network peripheral equipment (e.g., chokes, valves, compressors, etc.). As an alternative to the Method of Characteristics (MOC) that is widely used presently, a higher-order Total Variation Diminishing (TVD) method is used to model some transient problems. This class of methods has the capability to capture fine-scale phenomena and provides a better resolution of frontal discontinuities. In this study, the TVD method is utilized in conjunction with upwind methods. Also, in order to ensure a stable time-stepping scheme over a wide range of Courant-Friedrich-Lewy (CFL) number, a special Runge-Kutta method is employed as the base solution algorithm to integrate the highly non-linear, hyperbolic equations which govern the transportation of natural gas in pipelines. The overall procedure is stable, robust and accurate when applied to solve practical problems with simulated pressure waves.

  17. Determination of flow rates of oil, water and gas in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Roach, G.J.; Watt, J.S.; Zastawny, H.W. [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Lucas Heights, NSW (Australia). Div. of Mineral Physics

    1993-12-31

    This paper describes a multiphase flow meter developed by CSIRO for determining of the flow rates of oil, water and gas in high pressure pipelines, and the results of a trial of this flow meter on an offshore oil platform. Two gamma-ray transmission gauges are mounted about a pipeline carrying the full flow of oil, water and gas. The flow rates are determined by combining single energy gamma-ray transmission measurements which determine the mass per unit area of fluids in the gamma-ray beam as a function of time, dual energy gamma-ray transmission (DUET) which determine the approximate mass fraction of oil in the liquids, cross-correlation of gamma-ray transmission measurements, with one gauge upstream of the other, which determines flow velocity, pressure and temperature measurements, and knowledge of the specific gravities of oil and (salt) water, and solubility of the gas in the liquids, all as a function of pressure and temperature. 3 figs.

  18. 76 FR 41788 - Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment...

    Science.gov (United States)

    2011-07-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Alden Gas Storage Field Expansion Project and Request for Comments on Environmental Issues The staff...

  19. FEATURES OF CORROSION ACTIVITY OF MICROBIAL COMMUNITIES OF GAS-PIPELINE FERROSPHERE LAID IN SANDY SOIL

    OpenAIRE

    Демченко, Н. Р.; Курмакова, I. М.; Третяк, О. П.

    2015-01-01

    Aim. To study the sulfidogenic microbial communities road gas-pipeline ferrospheres laid in the sandy soil and the determination of its composition was the aim of this research work. Methods. The method of limiting dilution (plating cell suspension to appropriate liquid selection medium) was used for detection and isolation of the components of communities of bacteria and microscopic fungi complex. Due to quantitative and qualitative composition, sulfidogenic community of ferrospheres in corr...

  20. Implementation of Optimal Pacing Scheme in Xinjiang's Oil and Gas Pipeline Leak Monitoring Network

    Directory of Open Access Journals (Sweden)

    Peng Zhou

    2011-01-01

    Full Text Available Flow against Xingjian’s oil and gas pipeline leakage and the pipe network sudden burst pipe to pipeline leakage flow for the application objects, Optimal pacing scheme is designed in pipeline leak monitoring. Based on the property of Markov chain for network data, a new estimator with particle filter is proposed for congestion control in this paper. In the context of a reconfigurable transport protocol framework, we propose a QoS aware Transport Protocol (QSTP, specifically designed to operate over QoS (Quality of Service enabled networks with bandwidth guarantee. The proposed scheme can adaptively adjust the network rate in real -time, so that it can efficiently avoid the traffic congestion. It proposes a Link Layer Adaptive Pacing (LLAP scheme that adaptively controls the offered load into the network. The algorithms actively probe the underlay network and compute virtual multicast trees by dynamically selecting the least loaded available paths on the overlay network. The low computational complexity of the proposed algorithms leads to time and resource saving, as shown through extensive experiments. The Simulation results show that Network congestion avoidance strategy with optimal pacing scheme can efficiently improve the bandwidth utilization, Transmission Control Protocol (TCP friendliness and reduce the packet drop rate in Pipeline Flux Leak Monitoring networks. Flood flow identified by the National Centre for testing: discussion group first proposed the use of particle filters to solve the new model can estimate the network congestion control problem. The results are sound, stable performance, efficiency 29%. Adaptive algorithm using the model proposed optimization scheme, to achieve accurate positioning of the leak, 0.05% measurement accuracy, positioning accuracy is improved 32%, more than 17% of the nodes in a more reliable routing path, reliable routing path of increase of 40%.

  1. Nord stream: not just a pipeline. An analysis of the political debates in the Baltic Sea region regarding the planned gas pipeline from Russia to Germany

    Energy Technology Data Exchange (ETDEWEB)

    Whist, Bendik Solum

    2008-11-15

    This report is an analysis of the planned gas pipeline from Russia to Germany through the Baltic Sea known as Nord Stream. Although not yet realised, the project has, since its birth, been the subject of harsh criticism and opposition by a significant number of states that consider themselves affected by the pipeline. Whereas the Baltic States and Poland have interpreted the pipeline as a politically motivated strategy that will increase Russia's leverage on them and threaten their energy security, the debate in Sweden was at first mostly concerned with the prospect of increased Russian military presence in the Swedish Exclusive Economic Zone. The potential environmental impact of the pipeline has been, and continues to be, an overarching concern shared by all the littoral states of the Baltic Sea. Proponents of Nord Stream, most notably Germany, Russia and the Nord Stream consortium, have largely dismissed the concerns as unwarranted and argue that the pipeline is a common European project that all EU-members should embrace, as it will provide much-needed gas to an increasingly energy-thirsty union. This report is an extensive study of the divergent attitudes and debates that have surged in the region regarding Nord Stream, and the aim is to provide plausible explanations as to why the interpretations of the project have been so different in the various states. The report is based on a variety of sources, including several first-hand interviews with researchers and government officials in the Baltic Sea region. (author). refs.,fig.,tabs

  2. Logistic management system for natural gas transportation by pipelines; Sistema de gestao de logistica de transporte de gas por gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney Pereira dos; Castro, Antonio Orestes de Salvo [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Leal, Jose Eugenio [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil)

    2008-07-01

    An efficient management of the natural gas business chain, based on pipeline transmission network and taking into consideration the interaction between the main players such as shippers, suppliers, transmission companies and local distribution companies, requires the use of decision-making support systems to maximize resources and mitigate contingencies due to gas supply shortfalls, operational contingencies from scheduled and non-scheduled equipment outages as well as market demand shortfalls. This work presents a practical utilization of technologies such as thermohydraulic simulation of gas flow through pipelines, Monte Carlo simulation for compressor station availability studies and economic risk evaluation related to potential revenue losses and contractual penalties and linear programming for maximization and minimization objective function. The proposed system allows the definition of the optimum availability level to be maintained by the Transporter, by means of installing redundancy, to mitigate losses related to revenue and contractual penalties. Identifies, quantifies and justifies economically the installation of stand-by compressor units, mitigating Transporter exposure to losses due to capacity shortfalls as consequence of scheduled and non-scheduled outages. (author)

  3. Vale do Aco pipeline: pipeline natural gas implementation in ArcelorMittal Monlevade steel work; Gasoduto Vale do Aco: implantacao do gas natural via gasoduto na ArcelorMittal Monlevade

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Eduardo Sergio da Silva; Arantes, Luiz Flavio Mourao; Ribeiro, Vicente Aleixo Pinheiro [ArcelorMittal Monlevade, Joao Monlevade, MG (Brazil)

    2011-12-21

    Since September 2010, ArcelorMittal Monlevade has gained flexibility and an important opportunity to reduce the cost of its energy mix due to the arrival of the Natural Gas (NG) via Steel Valley Pipeline. The proposal of the project included the substitution of the Liquefied Petroleum Gas (LPG), Fuel Oil and Compressed Natural Gas for natural gas via pipeline. To support the investment decision, in addition to domestic economic and technical aspects, the macro economic environment concerning the NG was also taken into account. This paper shows the analysis for adjustment of internal equipment, the structure of the contract, the conceptual project of the gas distribution built inside the main events, the gains achieved, the alternatives for the acquisition of NG and operational flexibility of ArcelorMittal Monlevade in case of interruption of supply of natural gas. (author)

  4. Environmental Impact Assessment (EIA of Gas Pipeline Transmission (Case Study: Duzduzan – Ahar

    Directory of Open Access Journals (Sweden)

    Saeed Karimi

    2014-12-01

    Full Text Available The national gas transmission Ahar – Duzduzan, transmit fresh gas in the West north of Iran. According to Iran’s environmental regulation, construction and operation of pipelines is required EIA studies. Due to this linear project it is required to develop a particular EIA methodology on this kind of projects. Therefore at first we attempted to get a real knowledge about environmental endnotes of project with library and field studies. Along with reviewing the technical resources of the project, attempted to identify all of the construction and operation activities. Finally two methods of explanatory checklist and simplified matrix selected for EIA. In The construction phase 19 micro activities have evaluated in front of about 12 environmental factors (in the various environments. In the construction phase, activities such as; excavation, embankment and excavation show the greatest negative impact on the whole environment of area. And the most important activity with positive effects on the aforementioned factors is manpower recruitment. Also In the operation phase 15 micro activities have evaluated in front of about 15 environmental factors (in the various environments. In the Operation phase activities such as; grazing, vehicle traffic and wastewater production can have negative effects. Most positive impacts on environmental factors are revenue and welfare, employment levels, commerce and manning activities, immigration control and air quality. Most of the Operation phase effects are positive which involve; exploitation of gas or natural gas transportation and gas pipeline monitoring. According to the developed methodology it is necessary to use RS and GIS tools in the study current environment situation, routing environmental alternatives and make land use maps of transmission path. With regard to all issues presented in explanatory checklist of this project and also previous clauses from the standpoint of environmental compliance

  5. An Improved Negative Pressure Wave Method for Natural Gas Pipeline Leak Location Using FBG Based Strain Sensor and Wavelet Transform

    Directory of Open Access Journals (Sweden)

    Qingmin Hou

    2013-01-01

    Full Text Available Methods that more quickly locate leakages in natural gas pipelines are urgently required. In this paper, an improved negative pressure wave method based on FBG based strain sensors and wavelet analysis is proposed. This method takes into account the variation in the negative pressure wave propagation velocity and the gas velocity variation, uses the traditional leak location formula, and employs Compound Simpson and Dichotomy Searching for solving this formula. In addition, a FBG based strain sensor instead of a traditional pressure sensor was developed for detecting the negative pressure wave signal produced by leakage. Unlike traditional sensors, FBG sensors can be installed anywhere along the pipeline, thus leading to high positioning accuracy through more frequent installment of the sensors. Finally, a wavelet transform method was employed to locate the pressure drop points within the FBG signals. Experiment results show good positioning accuracy for natural gas pipeline leakage, using this new method.

  6. Influence of the key parameters of suspended structures on the inherent frequency of oil and gas pipelines

    Science.gov (United States)

    Tao, S. Y.; Liu, Q. Y.; Wang, G. R.; Jiang, J. C.

    2015-10-01

    Inherent frequency is an important parameter that reflects the dynamic stability of fluid-conveying pipelines. In engineering applications, the inherent frequency of pipelines is usually increased to improve their dynamic stability. The flow velocity and pressure of oil and gas pipelines cannot be altered freely. Among all of the parameters that affect the inherent frequency of suspended pipelines, the flexural stiffness of the stiffening girder, the tensile force of the cable system, and the pipe-axial precompression force are the most important. Revealing the influence laws of these three parameters could provide theoretical support for engineering designs. In this paper, a suspended crossing pipeline project was simplified as a Hetenyi's elastic foundation model. The flexural stiffness of the stiffening girder and the tensile force of the cable system were simplified as the foundation parameters G and K, respectively. The influence regularities of G, K, and the pipe-axial precompression force T on the pipeline inherent frequency were analyzed. According to the numerical simulation results, the ranks of these three parameters in descending order of importance were G, T, and K. During construction, G should be increased as much as possible. If the inherent frequency needs to be improved while pipelines have already been built up, it should be firstly considered to increase T, to values higher than zero if possible. On this basis, the further improvement of K could achieve a better result.

  7. Capital structure in LNG infrastructures and gas pipelines projects: Empirical evidences and methodological issues

    International Nuclear Information System (INIS)

    This paper provides new empirical insights on the capital structure of project-financed LNG infrastructures and gas pipeline projects, by using data relating to projects whose financial close occurred between June 2004 and March 2011. Most results are consistent with the basic view of risk-averse funds suppliers. Especially, the projects located in risky countries and larger projects tend to exhibit lower debt ratios and less-concentrated equity ownerships. In addition, regasification projects appear to have a more diluted equity ownership. Methodological issues raised by the financing of these projects are also examined from a capital-budgeting perspective. In particular, the equity residual method, usually used by industrial practitioners to value these projects, should be adjusted. - Highlights: • This paper provides new empirical insights on the capital structure of project-financed LNG and gas pipeline infrastructures. • Most of our results are consistent with the basic view of risk-averse funds suppliers. • Projects located in risky countries exhibit lower debt ratios and less-concentrated equity ownerships. • Larger projects and regasification projects also have less concentrated equity ownerships. • From a capital-budgeting viewpoint, we examine methodological issues raised by the financing of these projects

  8. Monitoring internal corrosion in natural gas pipelines; Monitoracao da corrosao interna em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Nobrega, Ana C.V.; Silva, Djalma R.; Pimenta, Gutemberg S. [Universidade Federal do Rio Grande do Norte, Natal, RN (Brazil); Barbosa, Andrea F.F. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Centro de Pesquisas

    2003-07-01

    For susceptibilities to the corrosion of the pipelines and equipment made in carbon steel and used by the natural gas, it makes be necessary to identify the acting corrosive agents and monitoring them along time, controlling failures for internal corrosion. Also, of that process it origins the black powder (solid particles) that can not commit the structural integrity of the equipment, but it can also bring the company other implications very serious, like quality of the sold product, as well as stops due to blockages and wastes for erosion of the equipment. The monitoring methodology and control of the corrosion in field consisted of the use of corrosion test equipment, chemical characterization of samples of black powder and liquids and analysis of the operational data of processes and plants. Like this, it was identified for the gas pipeline in analysis the most responsible parameters for the corrosive action of the fluid, establishing a controlling methodology and operational actions to maintain the corrosion rates at safe levels and structural warranty of the same. (author)

  9. The monitoring system of the pipeline safety of the coal mine gas drainage based on the optic fiber sensing technology

    Science.gov (United States)

    Li, Yan-fang; Wei, Yubin; Zhang, Tingting; Zhao, Yanjie; Lv, Lei; Liu, Tong-yu

    2013-09-01

    Based on the technology of the spectrum absorption and the FBG, the monitoring system realize on line detection of the concentration of methane and oxygen, the temperature and the pressure of the gas in pipeline, and in order to improve the accuracy of the gas detection, we induce the compensation to the gas concentration using the data of the temperature and the pressure. In order to have a effective utilization of the methane in the coal mine gas drainage system, we have to have a accurate measurements of the concentration, the temperature and the pressure of the gas in pipeline. At the same time the dynamic monitoring of the concentration of Oxygen is a sign of the leakage of the pump. This paper gave some data detected in the field of the coal mine gas drainage system.

  10. Integration of Wind Energy, Hydrogen and Natural Gas Pipeline Systems to Meet Community and Transportation Energy Needs: A Parametric Study

    OpenAIRE

    Shahryar Garmsiri; Marc A. Rosen; Gordon Rymal Smith

    2014-01-01

    The potential benefits are examined of the “Power-to-Gas†(P2G) scheme to utilize excess wind power capacity by generating hydrogen (or potentially methane) for use in the natural gas distribution grid. A parametric analysis is used to determine the feasibility and size of systems producing hydrogen that would be injected into the natural gas grid. Specifically, wind farms located in southwestern Ontario, Canada are considered. Infrastructure requirements, wind farm size, pipeline capacity...

  11. 天然气长输管道运行优化%Operations of long-distance natural gas pipeline

    Institute of Scientific and Technical Information of China (English)

    吴东

    2015-01-01

    天然气管道运输由于较长的运输距离,面临着复杂的环境因素,要想确保燃气安全运输,必须加强管道的运行管理。如果天然气长输管道运行管理不当,不仅可能导致管道失效、介质泄漏,造成环境污染和经济损失,影响用气单位和天然气用户的正常生产生活;其潜在可能发生的燃烧爆炸事故具有更大的危险性。因此,必须采取相应措施减小安全隐患发生的可能性,加强天然气长输管道运行优化,保证管道的安全平稳运行。本文分析了天然气管道运输运行中的隐患问题,提出了天然气长输管道运行优化措施,以供参考。%Due to the long transport distances,natural gas pipeline faces complex environmental factors. In order to ensure the safe transport,it needs to strengthen the management of pipeline operation. If the long-distance gas pipeline is not properly managed,it may cause pipeline failure,and media leaks. And it will also cause environmental pollution and economic losses,which affects the normal production of gas units and gas users. Therefore,it must take appropriate measures to reduce the likelihood of the occurrence of a security risk,to optimize long-distance gas pipeline management,and to ensure pipeline running smoothly and safely. This paper will analyze the natural gas pipeline running problems,and come up with measures oflong-distance gas pipeline operation optimization.

  12. Simulation of transients in natural gas pipelines using hybrid TVD schemes

    Energy Technology Data Exchange (ETDEWEB)

    Junyang Zhou [Pennsylvania State Univ., Petroleum and Natural Gas Engineering, University Park, PA (United States); Adewumi, Michael A. [Pennsylvania State Univ., Petroleum and Natural Gas Section, University Park, PA (United States)

    2000-07-01

    The mathematical model describing transients in natural gas pipelines constitutes a non-homogeneous system of non-linear hyperbolic conservation laws. The time splitting approach is adopted to solve this non-homogeneous hyperbolic model. At each time step, the non-homogeneous hyperbolic model is split into a homogeneous hyperbolic model and an ODE operator. An explicit 5-point, second-order-accurate total variation diminishing (TVD) scheme is formulated to solve the homogeneous system of non-linear hyperbolic conservation laws. Special attention is given to the treatment of boundary conditions at the inlet and the outlet of the pipeline. Hybrid methods involving the Godunov scheme (TVD/Godunov scheme) or the Roe scheme (TVD/Roe scheme) or the Lax-Wendroff scheme (TVD/LW scheme) are used to achieve appropriate boundary handling strategy. A severe condition involving instantaneous closure of a downstream valve is used to test the efficacy of the new schemes. The results produced by the TVD/Roe and TVD/Godunov schemes are excellent and comparable with each other, while the TVD/LW scheme performs reasonably well. The TVD/Roe scheme is applied to simulate the transport of a fast transient in a short pipe and the propagation of a slow transient in a long transmission pipeline. For the first example, the scheme produces excellent results, which capture and maintain the integrity of the wave fronts even after a long time. For the second example, comparisons of computational results are made using different discretizing parameters. (Author)

  13. Simulation of transients in natural gas pipelines using hybrid TVD schemes

    Science.gov (United States)

    Zhou, Junyang; Adewumi, Michael A.

    2000-02-01

    The mathematical model describing transients in natural gas pipelines constitutes a non-homogeneous system of non-linear hyperbolic conservation laws. The time splitting approach is adopted to solve this non-homogeneous hyperbolic model. At each time step, the non-homogeneous hyperbolic model is split into a homogeneous hyperbolic model and an ODE operator. An explicit 5-point, second-order-accurate total variation diminishing (TVD) scheme is formulated to solve the homogeneous system of non-linear hyperbolic conservation laws. Special attention is given to the treatment of boundary conditions at the inlet and the outlet of the pipeline. Hybrid methods involving the Godunov scheme (TVD/Godunov scheme) or the Roe scheme (TVD/Roe scheme) or the Lax-Wendroff scheme (TVD/LW scheme) are used to achieve appropriate boundary handling strategy. A severe condition involving instantaneous closure of a downstream valve is used to test the efficacy of the new schemes. The results produced by the TVD/Roe and TVD/Godunov schemes are excellent and comparable with each other, while the TVD/LW scheme performs reasonably well. The TVD/Roe scheme is applied to simulate the transport of a fast transient in a short pipe and the propagation of a slow transient in a long transmission pipeline. For the first example, the scheme produces excellent results, which capture and maintain the integrity of the wave fronts even after a long time. For the second example, comparisons of computational results are made using different discretizing parameters. Copyright

  14. Estimating Greenhouse Gas Emissions Level of A Natural Gas Pipeline – Case Study from A to B Point in West Java-Indonesia

    Directory of Open Access Journals (Sweden)

    Dianita Cindy

    2016-01-01

    Full Text Available Indonesia is one of the highest greenhouse emitters in the world. As a response of this problem, Indonesia declared the national action plan to focus on national greenhouse gas (GHG reduction by 26 % by 2020. To achieve this target, Government puts energy sector as one of the top priorities since it is the second strongest contributor to national GHG emissions. The main purpose of this paper is to apply the method of fugitive emissions calculation to the existing natural gas pipeline in Indonesia. Fugitive emissions are the major component of GHG emissions from natural gas systems and methane (CH4, the primary component of natural gas pipeline, is a potent GHG. Tiered approaches from Interstate Natural Gas Association of America (INGAA are implemented in this paper as the estimation guidelines. A case study of a natural gas pipeline system in Indonesia is analyzed to compare the GHG emissions level resulted from Tier 1 and Tier 2 methods. In these methods, the input data are pipeline length, the number of compressor stations, and the number of meter and pressure regulation stations. In this case, the GHG emissions level of Tier 2 is significantly different from Tier 1. The variation of pipeline length shows that for the length under 479.2 miles, Tier 1 gives lower amount of CO2 equivalent than Tier 2. The differences of these estimation methods and results can be furtherly developed to provide relevant information and recommendation for the Companies and Government to record the emissions level from natural gas transmission pipeline according to their needs and purposes.

  15. [Research on lateral shearing interferometer for field monitoring of natural gas pipeline leak].

    Science.gov (United States)

    Zhang, Xue-Feng; Gao, Yu-Bin

    2012-09-01

    Aimed at the mechanical scanning spectroscopy equipment with poor anti-interference and anti-jamming ability, which affects the accuracy of its natural gas pipeline leak detection in the wild, a new type of lateral shearing interferometer system was designed. The system uses a beam splitter to get optical path difference by a mechanical scanning part, and it cancel the introduction of external vibration interference through the linkage between the two beam splitterw. The interference intensity of interference fringes produced was calculated, and analysis of a rotating beam splitter corresponds to the angle of the optical path difference function, solving for the maximum angle of the forward rotation and reverse rotation, which is the maximum optical path range. Experiments using the gas tank deflated simulated natural gas pipeline leak process, in the interference conditions, and the test data of the type WQF530 spectrometer and the new type of lateral shearing interferometer system were comparedt. The experimental results show that the relative error of both systems is about 1% in indoor conditions without interference. However, in interference environment, the error of WQF530 type spectrometer becomes larger, more than 10%, but the error of the new type of lateral shearing interferometer system is still below 5%. The detection accuracy of the type WQF530 spectrometer decreased significantly due to the environment. Therefore, the seismic design of the system can effectively offset power deviation and half-width increases of center wavelength caused by external interference, and compared to conventional mechanical scanning interferometer devices the new system is more suitable for field detection. PMID:23240445

  16. AIRBORNE, OPTICAL REMOTE SENSING OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    Energy Technology Data Exchange (ETDEWEB)

    Jerry Myers

    2003-05-13

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. This six-month technical report summarizes the progress for each of the proposed tasks, discusses project concerns, and outlines near-term goals. Ophir has completed a data survey of two major natural gas pipeline companies on the design requirements for an airborne, optical remote sensor. The results of this survey are disclosed in this report. A substantial amount of time was spent on modeling the expected optical signal at the receiver at different absorption wavelengths, and determining the impact of noise sources such as solar background, signal shot noise, and electronic noise on methane and ethane gas detection. Based upon the signal to noise modeling and industry input, Ophir finalized the design requirements for the airborne sensor, and released the critical sensor light source design requirements to qualified vendors. Responses from the vendors indicated that the light source was not commercially available, and will require a research and development effort to produce. Three vendors have responded positively with proposed design solutions. Ophir has decided to conduct short path optical laboratory experiments to verify the existence of methane and absorption at the specified wavelength, prior to proceeding with the light source selection. Techniques to eliminate common mode noise were also evaluated during the laboratory tests. Finally, Ophir has included a summary of the potential concerns for project success and has established future goals.

  17. A Study on Inhibitors for the Prevention of Hydrate Formation in Gas Transmission Pipeline

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Gas Hydrate is usually formed during the transportation and treatment of oil and gas,resulting in the plugging of gas pipeline and equipment. Three thermodynanic calculation formulas are analyzed to deal with this problem. The lowering of the freezing point of the inhibitors △T is used to calculate the formation temperature of natural gas hydrates. This is. considered to be a good approach because it is not limited by what kind and what concentration of inhibitors one uses. Besides, the rate of lowering of the freezing point could be easily measured. The result of testing methanol and mono-ethylene glycol in a reactor shows that adding 10% inhibitors to the reactor can prevent the hydrates formation.Kinetic inhibitors are favored in the present research. They are divided into two types, polymer and surface-active agents. Their characteristics, mechanisms, and application prospect are separately discussed.Polymer inhibitors exhibit better efficiency. The result of field application of VC-713 inhibiter is also given in this article. In practice, the combination of thermodynamic inhibitors and kinetic inhibitors gives better result.

  18. Energy Equation Derivation of the Oil-Gas Flow in Pipelines Dérivation de l’équation d’énergie de l’écoulement huile-gaz dans des pipelines

    OpenAIRE

    Duan J.M; Wang W; Zhang Y; Zheng L.J.; Liu H.S.; Gong J

    2012-01-01

    In the simulation of oil-gas pipeline multiphase flow, thermodynamic computation is an important process interacting with the hydraulic calculation and it influences the convergence of the program and the accuracy of the results. The form of the energy equation is the key to the thermodynamic computation. Based on the energy equation of oil-gas flow in pipeline, the Explicit Temperature Drop Formula (ETDF) is derived for oilgas steady state temperature calculation. This new energy equation ha...

  19. Offer a New Model to Prevent Formation of Hydrate in Gas Pipeline in Gas Refinery

    OpenAIRE

    Amir Samimi

    2012-01-01

    Water molecules by making hydrogen joint with its molecules creates holes in which quest molecules will be trapped and by creating van deer Waals joint with water molecules, hydrates crystals will be produced. Natural gas and crude oil in natural exist in underground reservoirs are in contact with water. Hydration needs condition which consists of having water in pipe line, high pressure (pressure always is high because of reinforcing gas pressure in gas transportation pipe lines), low temper...

  20. 77 FR 14006 - Proposed Development of the Alaska Stand Alone Gas Pipeline Project (ASAP), From the North Slope...

    Science.gov (United States)

    2012-03-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Proposed Development of the Alaska Stand Alone Gas Pipeline... January 20, 2012, issue of the Federal Register (77 FR No. 13), the U.S. Army Corps of Engineers...

  1. 77 FR 31347 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Availability of the Environmental Assessment...

    Science.gov (United States)

    2012-05-25

    ... markets in Ohio and Tennessee. \\1\\ A pipeline loop is a segment of pipe constructed parallel to an... stations to provide bi-directional natural gas flow: Station 219 in Mercer County, Station 303 in Venango... encourages electronic filing of comments and has expert staff available to assist you at (202) 502-8258...

  2. 76 FR 77994 - Brian Hamilton v. El Paso Natural Gas, El Paso Western Pipelines; Notice Announcing Docket Number...

    Science.gov (United States)

    2011-12-15

    ... Energy Regulatory Commission Brian Hamilton v. El Paso Natural Gas, El Paso Western Pipelines; Notice Announcing Docket Number Change On December 2, 2011, the Commission issued a notice in docket number RP12-220... docket number, RP12-220-000 and give the proceeding a new docket number. This notice changes the...

  3. Papers of the Canadian Energy Pipeline Association's 7. annual climate change workshop : energy efficiency and greenhouse gas reduction opportunities

    International Nuclear Information System (INIS)

    This conference focused on the role that Canadian pipeline companies will play in addressing greenhouse gas emissions. Ninety-five per cent of Canada's oil and gas is transported by pipeline. The Canadian Energy Pipeline Association (CEPA) is a national association representing all the major crude oil and natural gas transportation companies in Canada which operate 100,000 kilometres of pipeline in the country. CEPA's ongoing commitment to climate change includes a commitment to participate in the climate change process, share best management practices, develop energy efficient technology, and position Canadian companies so that they can be part of the solution. It was emphasized that a strong commitment to an effective innovation strategy will be crucial to a successful long term energy policy that meets both economic and environmental objectives. One of the key messages at the conference was that Canada's climate change policies should be consistent with those of the United States, its major trading partner, to ensure that Canada is not placed at a competitive disadvantage within North American and world energy markets. It was also noted that greenhouse gas emissions should be reduced in all consuming and producing sectors of the economy through energy efficiency practices and not through reductions in Canadian industry output for domestic or export markets. Five presentations were indexed separately for inclusion in the database. tabs., figs

  4. Application of pre-stressed technology in the crossing construction of the China–Myanmar Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Xuejun Wang

    2015-01-01

    Full Text Available Concrete structure is commonly used in the anchorages of a large cable-suspended pipeline crossing construction. With the increase of span and load, the stress on the concrete anchorages may rise rapidly. In case of traditional anchoring structure fixed by anchor rods, concrete cracking will occur, thereby reducing the anchorage life. To solve this problem, the pre-stressed structure was designed to effectively improve the efficiency of anchoring and reduce engineering cost. In the crossing construction of China–Myanmar Gas Pipeline, the pre-stressed technology was used to establish an effective pre-stressed anchoring system, which integrates the pre-stressed structures (e.g. tunnel anchorages in the anchors and the optimization measures (e.g. positioning mode, anchorage structure, concrete placement, pre-stressed, and medium injection, in line with the crossing structure and load features of this project. The system can delay the occurrence of concrete cracking and enhance the stress durability of the structure and anchoring efficiency. This technology has been successfully applied in the crossing construction of China–Myanmar Gas Pipeline, with good economic and social benefits, indicating that this technology is a new effective solution to the optimization of suspended pipeline anchorage structures, providing technical support for the development of pipeline crossing structure.

  5. Natural gas pipeline leak detector based on NIR diode laser absorption spectroscopy

    Science.gov (United States)

    Gao, Xiaoming; Fan, Hong; Huang, Teng; Wang, Xia; Bao, Jian; Li, Xiaoyun; Huang, Wei; Zhang, Weijun

    2006-09-01

    The paper reports on the development of an integrated natural gas pipeline leak detector based on diode laser absorption spectroscopy. The detector transmits a 1.653 μm DFB diode laser with 10 mW and detects a fraction of the backscatter reflected from the topographic targets. To eliminate the effect of topographic scatter targets, a ratio detection technique was used. Wavelength modulation and harmonic detection were used to improve the detection sensitivity. The experimental detection limit is 50 ppm m, remote detection for a distance up to 20 m away topographic scatter target is demonstrated. Using a known simulative leak pipe, minimum detectable pipe leak flux is less than 10 ml/min.

  6. Simplification of executive procedures for construction and assembly of terrestrial gas pipelines through illustrations

    Energy Technology Data Exchange (ETDEWEB)

    Filho, Mario D.C.; Bresci, Claudio T.; Dantas, Augusto Cesar de C.; Machado, Clara C. Torres S. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Sobreiro, Flavia L. [Telsan Engenharia, Belo Horizonte, MG (Brazil)

    2009-07-01

    This study aims to show a simple, efficient and fun method that seeks to minimize the weaknesses and help to increase the perception of risk analysis and systematization the operation discipline. This project uses the methodology of images illustrated in the executive procedures, and is based on the activities of construction and assembly, HSE and social communication in gas pipeline ventures, setting and maintaining access to practical information, yet are prepared a work instructions that summarize each process, as a form of material support in training. Among several objectives that have shaped the strategies for this project, the main is to provide the workforce engaged in the activities of field, greater facility in implementing the technical information contained in the procedures, from a wider and better understanding of the guidelines described in the documentation. (author)

  7. New test for oil soluble/water dispersible gas pipeline inhibitors

    Energy Technology Data Exchange (ETDEWEB)

    Stegmann, D.W.; Asperger, R.G.

    1987-01-01

    The wheel test provides good mixing of the condensate and water phases, the coupons are exposed to both phases. Therefore, the wheel test cannot distinguish between inhibitors that need continuous mixing of the these phases to maintain a water dispersion of the inhibitor and inhibitors that will self disperse into the water. This concept becomes important for pipelines in stratified flow where the water can settle out. In these cases with low turbulence, the inhibitor must self disperse into the water to be effective. The paper describes a test method to measure the effectiveness of an inhibitor and its ability to self disperse. The effectiveness of several inhibitors as predicted by the new test method is discussed relative to data from the wheel test and breaker tests. Field performance of these inhibitors in a gas gathering line, with liquids in stratified flow, are cities and compared with the results of the various laboratory tests.

  8. Real-time electronic monitoring of a pitted and leaking gas gathering pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Asperger, R.G.; Hewitt, P.G.

    1986-08-01

    Hydrogen patch, flush electrical resistance, and flush linear polarization proves wre used with flush coupons to monitor corrosion rates in a pitted and leaking sour gas gathering line. Four inhibitors were evaluated in stopping the leaks. Inhibitor residuals and the amount and ratio of water and condensate in the lines were measured at five locations along the line. The best inhibitor reduced reduced the pit-leak frequency by over a factor of 10. Inhibitor usage rate was optimized using the hydrogen patch current as a measure of the instantaneous corrosion rate. Improper pigging was identified as a cause of corrosion transients. This problem is discussed in relation to the pigging of pipelines in stratified flow where moving fluids are the carriers for continuously injected corrosion inhibitors.

  9. Factors influencing stress corrosion cracking of gas transmission pipelines: Detailed studies following a pipeline failure. Part 2: Pipe metallurgy and mechanical testing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmott, M.J.; Diakow, D.A.

    1996-12-31

    Following a failure caused by stress corrosion cracking (SCC) on an NPS 8 pipeline in the Nova Gas Transmission (NGTL) system, a detailed investigation was undertaken to understand the contributing factors resulting in the failure. Studies included site characterization using the NOVAProbe, followed by a detailed excavation, sampling, pipe replacement and subsequent metallurgical analysis. In total, 1.1 km of pipe was inspected and replaced. This paper will detail the results of pipe inspection, mechanical testing and metallurgical results of pipe inspection, mechanical testing and metallurgical analysis following excavation. Possible correlation of the results with potential SCC severity is discussed.

  10. A flameless catalytic combustion-based thermoelectric generator for powering electronic instruments on gas pipelines

    International Nuclear Information System (INIS)

    Highlights: ► MPPT is used to improve the feature that TEG output is sensitive to load variation. ► The improved feature makes TEG suitable to power electronic device on gas pipeline. ► Test shows heat transfer uniformity plays an important role in improving TEG output. ► It can get an optimized TEG by uniformly filling a thermal insulation material. - Abstract: This paper presents a flameless catalytic combustion-based thermoelectric power generator that uses commercial thermoelectric modules. The structure of the thermoelectric generator (TEG) is introduced and the power performance is measured based on a designed circuit system. The open circuit voltage of the TEG is about 7.3 V. The maximum power output can reach up to 6.5 W when the load resistance matches the TEG internal resistance. However, the system output is sensitive to load variation. To improve this characteristic, maximum power point tracking technique is used and results in an open circuit voltage of 13.8 V. The improved characteristic makes the TEG system a good charger to keep the lead acid battery fully charged so as to meet the needs of electronic instruments on gas pipelines. In addition, the combustion features have been investigated based on the temperature measurement. Test results show that the uniformity of combustion heat transfer process and the combustion chamber structure play important roles in improving system power output. It can get an optimized TEG system (maximum power output: 8.3 W) by uniformly filling a thermal insulation material (asbestos) to avoid a non-uniform combustion heat transfer process

  11. Transportation of natural gas : The impact of price variation on the choice between LNG and pipeline infrastructure

    OpenAIRE

    2011-01-01

    The long-distance transportation of natural gas, either in the form of liquefied natural gas (LNG) or by pipeline, is of great importance for both exporting and importing countries. Exporting countries depend on the revenue from exports. Energy security is a major concern for importing countries, especially for the European Union, which is dependent on imports. Long-distance transportation also requires large-scale capital investment in infrastructure involving both states, state-controlled c...

  12. An Improved Negative Pressure Wave Method for Natural Gas Pipeline Leak Location Using FBG Based Strain Sensor and Wavelet Transform

    OpenAIRE

    Qingmin Hou; Liang Ren; Wenling Jiao; Pinghua Zou; Gangbing Song

    2013-01-01

    Methods that more quickly locate leakages in natural gas pipelines are urgently required. In this paper, an improved negative pressure wave method based on FBG based strain sensors and wavelet analysis is proposed. This method takes into account the variation in the negative pressure wave propagation velocity and the gas velocity variation, uses the traditional leak location formula, and employs Compound Simpson and Dichotomy Searching for solving this formula. In addition, a FBG based strain...

  13. Comparative QRA (Quantitative Risk Analysis) of natural gas distribution pipelines in urban areas; Analise comparativa dos riscos da operacao de linhas de gas natural em areas urbanas

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Luiz Fernando S. de [Energy Solutions South America (Brazil); Cardoso, Cassia de O.; Storch, Rafael [Det Norske Veritas (DNV) (Brazil)

    2008-07-01

    The natural gas pipeline network grows around the world, but its operation inherently imposes a risk to the people living next to pipelines. Due to this, it is necessary to conduct a risk analysis during the environmental licensing in Brazil. Despite the risk analysis methodology is well established, some points of its application for the distribution pipelines are still under discussion. This paper presents a methodology that examines the influences of major projects and operating parameters on the risk calculation of a distribution pipeline accident in urban areas as well as the possible accident scenarios assessment complexity. The impact of some scenarios has been evaluated using a Computational Fluid Dynamics tool. The results indicate that, under certain conditions, the risks from the pipeline operation under operating pressures of 20 bar may be acceptable in location class 3 or even in class 4. These results play a very important role if management decisions on the growth of the distribution of natural gas network in densely populated areas as well as in the improvement of laws to control the activity of distribution of natural gas. (author)

  14. Pipelines integrity management in Transportadora de Gas del Sur; Gerenciamento de la integridad de gasoductos en Transportadora de Gas del Sur

    Energy Technology Data Exchange (ETDEWEB)

    Espineira, Eduardo [Transportadora de Gas del Sur (TGS) (Argentina). Gerencia de Integridad de Gasoductos

    2003-07-01

    To control the integrity of a buried gas pipeline system is not an easy task for a gas pipeline operator. As the threats that affect pipeline integrity are many, it is critical to obtain, visualize, and analyze a great quantity of data in order to ensure a safe and continuous gas supply. This task becomes even more complex in the case of pipelines installed long time ago, where time pays an important role in the formation and development of defects. It is essential to maintain a policy of permanent evaluation, monitoring and repair that allows to evaluate the integrity plan developed and to make the changes that might be necessary. The TGS pipeline system consists of 7400 Km of pipe with an average age of 30 years, going across a great variety of soils and zones with distinctive geographical features that demand the continuous investment of money. This study describes the integrity plan set up by TGS and its evolution in time, including the main tasks related to information gathering and analysis, as well as all rehabilitation tasks. The evaluation of the integrity plan implementation, and the evolution of failure rates in time with respect to the related investments are also described. Finally, the analysis includes the information management systems applied by TGS such as the Geographic Information System . (author)

  15. Design of a Prediction System for Hydrate Formation in Gas Pipelines using Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Ahmed Raed Moukhtar

    2016-09-01

    Full Text Available Before the evolution of the Wireless Sensor Networks (WSN technology, many production wells in the oil and gas industry were suffering from the gas hydration formation process, as most of them are remotely located away from the host location. By taking the advantage of the WSN technology, it is possible now to monitor and predict the critical conditions at which hydration will form by using any computerized model. In fact, most of the developed models are based on two well-known hand calculation methods which are the Specific gravity and K-Factor methods. In this research, the proposed work is divided into two phases; first, the development of a three prediction models using the Neural Network algorithm (ANN based on the specific gravity charts, the K-Factor method and the production rates of the flowing gas mixture in the process pipelines. While in the second phase, two WSN prototype models are designed and implemented using National Instruments WSN hardware devices. Power analysis is carried out on the designed prototypes and regression models are developed to give a relation between the sensing nodes (SN consumed current, Node-to-Gateway distance and the operating link quality. The prototypes controller is interfaced with a GSM module and connected to a web server to be monitored via mobile and internet networks.

  16. Importance of effective contract management of GasPacifico Pipeline Project : a case study

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, R.G.; Proctor, C. [GasPacifico Project (Argentina)

    2000-07-01

    This paper described the contracting challenges and bid evaluations for the GasPacifico Project which involved the construction of 543 km of NPS 20 and NPS 24 high pressure gas pipeline to connect natural gas reserves in the Province of Neuquen, Argentina to industrial and domestic markets in Concepcion, Chile. The line passes through difficult terrain in the Andes Mountain Range and Coastal Mountain Range. TransCanada International Ltd. (TCI) was responsible for the overall project management of the project from design, construction and contract administration. Call for bids on the project went out in March 1998 and contracts were awarded less than 5 months later in July 1998. TCI's objective was to ensure that the contractors had the experience, resources and financial ability to successfully complete the project. The work was divided into distinct contract packages on the basis of changes in pipe diameter, natural changes in topography, border between Argentina/Chile, and considerations related to the large number of landowners in agricultural and urban zones. Based on a review of pre-qualifications, 18 contractors were invited on a reconnaissance tour to familiarize the bidders with the project. When a review of the technical bids was completed, evaluation of the commercial bids began. When the difference in technical rating was very small, the lowest technically acceptable bidder was accepted. The project was constructed on schedule and under budget. It was noted that much of this success is a result of the contract selection process. 5 tabs., 3 figs.

  17. Evaluation and application of data sources for assessing operating costs for mechanical drive gas turbines in pipeline service

    Energy Technology Data Exchange (ETDEWEB)

    Smalley, A.J.; Mauney, D.A. [Southwest Research Inst., San Antonio, TX (United States); Ash, D.I. [Conoco Inc., Ponca City, OK (United States)

    1999-07-01

    The use of regression analysis of public domain data provided by interstate pipeline companies to the Federal Energy Regulatory Commission (FERC), combined with individual company equipment lists to generate information on cost of operations, maintenance, fuel gas used and the cost of fuel and power, is demonstrated. Methods of analysis and limitations are identified, and results of such regression analysis as average and variance of cost and fuel usage for industrial gas turbines and aeroderivative gas turbines are discussed. Comparison between gas turbine prime movers, reciprocating engine prime movers and electric motor drives are made, and annual costs per installed horsepower as a function of turbine size are calculated. 1 ref., 6 figs.

  18. Power line-induced ac potential on natural gas pipelines for complex rights-of-way configurations. Volume 4. Field verification of horizontal wire mitigation method. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, M.

    1984-04-01

    The joint use of common corridors for overhead electric power transmission lines and buried natural gas transmission pipelines is increasing. While many benefits accrue from the sharing of corridors, the coupling of electromagnetic energy onto the natural gas transmission pipelines is an undesired consequence of this joint usage. The steady-state pipeline voltage that can result may require mitigation as a safety measure. Many common corridors include multiple power lines and pipelines with complexities such as bonds or crossovers between the pipelines and terminating pipelines or insulators. This project has resulted in the development of the methodology and techniques for analyzing such complex common corridor coupling problems. Field tests were conducted to verify key aspects of the analysis.

  19. Criterions and Measures of Route Selection of Shallowly Embedded Long-Distance Oil and Gas Pipeline in Mountain Areas

    Institute of Scientific and Technical Information of China (English)

    WANG Chenghua; MA Qingwen; KONG Jiming; CHEN Zefu; LI Xiuzhen

    2006-01-01

    According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.

  20. In-service life estimation of damaged gas pipelines: Full-scale experiments and finite element analyses

    Directory of Open Access Journals (Sweden)

    Burgaud Guillaume

    2014-06-01

    Full Text Available Statistical analysis reveals that mechanical damage is the first cause of incidents on gas transmission pipelines. They can be created by third party activities such as excavator tooth impact or by interaction between the pipe and rocks. To manage the damaged pipeline safely without useless cost, there is a need to investigate the mechanical behaviour of dented pipelines under a varying internal pressure. The purpose of this study is to characterize the stress and strain field around defects in pipes submitted to cyclic pressure loadings in order to estimate their residual lifetime. Full 3D finite element analyses of the denting process followed by cyclic loading are performed. Full-scale experiments on dented sections are planned.

  1. On-line Detection of Gas Pipeline Based on the Real-Time Algorithm and Network Technology with Robot

    Institute of Scientific and Technical Information of China (English)

    YAN Bo; YAN Guo-zheng; DING Guo-qing; ZHOU Bing; FU Xi-guang; ZUO Jian-yong

    2004-01-01

    The detection system integrates control technology, network technology, video encoding and decoding, video transmiss-ion, multi-single chip microcomputer communication, dat-abase technology, computer software and robot technology. The robot can adaptively adjust its status according to diameter (from 400 mm to 650 mm) of pipeline. The maximum detection distance is up to 1 000 m. The method of video coding in the system is based on fractal transformation. The experiments show that the coding scheme is fast and good PSNR. The precision of on-line detection is up to 3% thickness of pipeline wall. The robot can also have a high precision of location up to 0.03 m. The control method is based on network and characterized by on-line and real-time. The experiment in real gas pipeline shows that the performance of the detection system is good.

  2. Offer a New Model to Prevent Formation of Hydrate in Gas Pipeline in Gas Refinery

    Directory of Open Access Journals (Sweden)

    Amir Samimi

    2012-12-01

    Full Text Available Water molecules by making hydrogen joint with its molecules creates holes in which quest molecules will be trapped and by creating van deer Waals joint with water molecules, hydrates crystals will be produced. Natural gas and crude oil in natural exist in underground reservoirs are in contact with water. Hydration needs condition which consists of having water in pipe line, high pressure (pressure always is high because of reinforcing gas pressure in gas transportation pipe lines, low temperature (temperature is always low in cold seasons of year, and presence of hydrate-making substances like methane, carbon dioxide, and... There are four methods to prevent hydration. This article will focus on analyzing synthetic inhibitors, and their function the task orders are as followed: 1. Synthetic investigation of hydrate formation with and without presence of inhibitor. 2. Using Kashchiev- Firozabad model and experimental data of gas transporting pipe lines for drawing synthetic graphs of gas hydrates formation with presence of synthetic inhibitors.

  3. AN ALTERNATE METHOD TO PREVENT SAND ABRASIVE EROSION IN PIPELINES FOR TRANSPORTING HIGH-SPEED NATURAL GAS

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    This paper presents an alternate method to re-move the sand carried by natural gas in the upstream pipelinestherefore preventing sand abrasive erosion in pipelines used intransporting high-speed natural gas. Conventionally, most ex-perts pay much attention to improving the anti-erosion charac-teristics of the pipeline materials to solve the problem of seri-ous abrasive erosion, but without significant success. Basedon the theory of multiphase flow and analysis of the character-istics of sandy jets, a new equipment named "Sand Catcher" isintroduced in this article. Experimental results show that theSand Catcher effectively removes most of the sand in the natu-ral gas and significantly reduces the abrasive erosion of thepipelines. The Sand Catcher can be widely applied in practicein the near future.

  4. The use of the natural-gas pipeline infrastructure for hydrogen transport in a changing market structure

    International Nuclear Information System (INIS)

    In this paper, the transport and distribution aspects of hydrogen during the transition period towards a possible full-blown hydrogen economy are carefully looked at. Firstly, the energetic and material aspects of hydrogen transport through the existing natural-gas (NG) pipeline infrastructure is discussed. Hereby, only the use of centrifugal compressors and the short-term security of supply seem to constitute a problem for the NG to hydrogen transition. Subsequently, the possibility of percentwise mixing of hydrogen into the NG bulk is dealt with. Mixtures containing up to 17 vol% of hydrogen should not cause difficulties. As soon as more hydrogen is injected, replacement of end-use applications and some pipelines will be necessary. Finally, the transition towards full-blown hydrogen transport in (previously carrying) NG pipelines is treated. Some policy guidelines are offered, both in a regulated and a liberalised energy (gas) market. As a conclusion, it can be stated that the use of hydrogen-natural gas mixtures seems well suited for the transition from natural gas to hydrogen on a distribution (low pressure) level. However, getting the hydrogen gas to the distribution grid, by means of the transport grid, remains a major issue. In the end, the structure of the market, regulated or liberalised, turns out not to be important. (author)

  5. Pipelines to Brussels: Natural gas exporters' strategies in a changing European gas market

    International Nuclear Information System (INIS)

    On the political level several different processes will influence the future of the European gas market. The possibilities of large increases in demand due to environmental concerns, and economic development, particularly in Eastern Europe, are beginning to change the buyer's market of the 1980's into a seller's market in the 1990's. Turning to the individual producers, one should not rule out a possible extension of the Dutch export contracts beyond 2010, but the main actors are likely to be the Russian Federation and Norway, as the Algerians are unlikely to stabilize their economy and the political uncertainties. The Russian Federation and Norway seem to be in the best position to capture the demand increase assumed in the next ten to twenty years. However, if the demand forecasts of today turn out to be accurate, there is no reason to worry about future competition between the Russian Federation and Norway. The demand increase would give room for both producers to export large volumes to the European market. Even a conservative estimate of gas demand at about 300 billion m3 in the year 2010, does give 90 billion m3 to be filled in by additional deliveries. The ''environmental-scenario'', where a substantial number of coal and oil fired power stations are replaced with gas stations, could easily push demand up to 450 billion m3. In this scenario gas would take a larger share of the total energy consumption in Europe. This could make importers more concerned with diversification of their gas imports. On the other hand, the pressure for cleaner fuels could obtain a higher priority than diversification, especially if the political situation stabilizes in the exporting countries: the Russian Federation and Algeria. It could come to a choice between a concentration of gas imports from the Russian Federation and Norway, and the more polluting use of coal and oil. The solution to this choice is not obvious. 26 refs., 11 figs

  6. A Case Study in Forensic Seismology: The 1998 Natural Gas Pipeline Explosion Near Carlsbad, New Mexico

    Science.gov (United States)

    Koper, K. D.; Wallace, T. C.; Aster, R. C.

    2002-12-01

    On August 19, 2000 two seismometer networks in southeastern New Mexico recorded signals from a natural gas pipeline explosion. The explosion killed 12 members of an extended family that had been camping on the banks of a nearby river. Analysis of the particle motion, arrival times, and durations of the seismic signals indicate that three impulsive events occurred with origin times of 11:26:18.8 +/- 1.9, 11:26:43.6 +/- 2.1, and 11:27:01.7 +/- 2.0 (GMT). Each event generated an Rg wave with group velocity of 1.7-2.0 km/s and an air-coupled Rayleigh wave with a group velocity of about 345 m/s. The air-coupled Rayleigh waves had especially large amplitudes because of a geometric waveguide created by an atmospheric temperature inversion at the time of the accident. The first event was due to the explosive blowout of the buried, high-pressure pipeline while the second event was due to the ignition of the vented natural gas. The nature of the third event is unclear, however it was likely created by a secondary ignition. There were also two extended seismic events that were coeval with the first two impulsive events. The first resulted from the pre-ignition venting of the gas and lasted for about 24~s, while the second resulted from the post-ignition roaring of the flames and lasted for about one hour. Many of the source constraints provided by the seismic data were not available from any other investigative technique and so were valuable to a diverse range of parties including the New Mexico State Police, law firms involved in litigation related to the accident, the National Transportation and Safety Board, and the general public. Especially important was the seismically derived time between the blowout and ignition. The 24.0~s lag indicates that the initial rending of the pipe did not cause the ignition and that a more likely source was the nearby campsite, and it also significantly affected the amount of punitive damages the families of the victims were due since the

  7. GMAW (Gas Metal Arc Welding) process development for girth welding of high strength pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Rajan, Vaidyanath; Daniel, Joe; Quintana, Marie [The Lincoln Electric Company, Cleveland, OH (United States); Chen, Yaoshan [Center for Reliable Energy Systems (CRES), Dublin, OH (United States); Souza, Antonio [Lincoln Electric do Brasil, Guarulhos, SP (Brazil)

    2009-07-01

    This paper highlights some of the results and findings from the first phase of a consolidated program co-funded by US Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA) and Pipeline Research Council Inc (PRCI) to develop pipe weld assessment and qualification methods and optimize X 100 pipe welding technologies. One objective of the program is to establish the range of viable welding options for X 100 line pipe, and define the essential variables to provide welding process control for reliable and consistent mechanical performance of the weldments. In this first phase, a series of narrow gap girth welds were made with pulsed gas metal arc welding (GMAW), instrumented with thermocouples in the heat affected zone (HAZ) and weld metal to obtain the associated thermal profiles, and instrumented to measure true energy input as opposed to conventional heat input. Results reveal that true heat input is 16%-22% higher than conventional heat input. The thermal profile measurements correlate very well with thermal model predictions using true energy input data, which indicates the viability of treating the latter as an essential variable. Ongoing microstructural and mechanical testing work will enable validation of an integrated thermal-microstructural model being developed for these applications. Outputs from this model will be used to correlate essential welding process variables with weld microstructure and hardness. This will ultimately enable development of a list of essential variables and the ranges needed to ensure mechanical properties are achieved in practice, recommendations for controlling and monitoring these essential variables and test methods suitable for classification of welding consumables. (author)

  8. Pipeline investigation report : natural gas compressor station occurrence : Gazoduc TQM Inc., December 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-02-01

    On December 28, 2000, a release of natural gas resulted in an explosion that destroyed the electrical and services building at the Gazoduc TQM East Hereford compressor station, damaging the compressor building. Before the occurrence, the station had been shut down due to a manual initiation of the station's emergency shutdown system. A maintenance person was sent to the station to reinitiate the electric motor-driven compressor unit. The on-site maintenance person was seriously injured. This report presents factual information about the accident, the injuries and the damage to equipment. It also reviews particulars of the pipeline system, the compressor station design, construction and operations. An analysis of the natural gas stream found an unknown product in the compressor station. A history of previous explosions, ruptures, leaks and fires was presented along with quality control programs. Findings as to the causes and contributing factors of the accident were revealed along with findings as to risk and safety actions. tabs., figs.

  9. AIRBORNE, OPTICAL REMOTE SENSING OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    Energy Technology Data Exchange (ETDEWEB)

    Jerry Myers

    2003-11-12

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. This second six-month technical report summarizes the progress made towards defining, designing, and developing the hardware and software segments of the airborne, optical remote methane and ethane sensor. The most challenging task to date has been to identify a vendor capable of designing and developing a light source with the appropriate output wavelength and power. This report will document the work that has been done to identify design requirements, and potential vendors for the light source. Significant progress has also been made in characterizing the amount of light return available from a remote target at various distances from the light source. A great deal of time has been spent conducting laboratory and long-optical path target reflectance measurements. This is important since it helps to establish the overall optical output requirements for the sensor. It also reduces the relative uncertainty and risk associated with developing a custom light source. The data gathered from the optical path testing has been translated to the airborne transceiver design in such areas as: fiber coupling, optical detector selection, gas filters, and software analysis. Ophir will next, summarize the design progress of the transceiver hardware and software development. Finally, Ophir will discuss remaining project issues that may impact the success of the project.

  10. Progress in Spiral Saw Steel Pipe Manufacturing Technology Promotes Construction of Oil/Gas Long-Distance Pipelines in West China

    Institute of Scientific and Technical Information of China (English)

    Huang Zhiqian

    1997-01-01

    @@ Introduction Since the tremendous development of oil and gas exploration achieved in West China at the beginning of 1990's, it is demanded to build several long-distance oil/gas pipelines to transmit the crude oil and natural gas from Tarimu Basin, Tuha Basin, Junggar Basin as well as Shaan-Gan-Ning Basin to the cities of Urumuqi,Klamayi, Xi'an and Beijing (details see Table 1). The total length of pipelines is more than 3 200 km, and the natural conditions along the pipelines are very harsh. This raises a challenge to the Chinese pipe manufacturing industry.

  11. Burst strength behaviour of an aging subsea gas pipeline elbow in different external and internal corrosion-damaged positions

    Directory of Open Access Journals (Sweden)

    Lee Geon Ho

    2015-05-01

    Full Text Available Evaluation of the performance of aging structures is essential in the oil and gas industry, where the inaccurate prediction of structural performance can have significantly hazardous consequences. The effects of structure failure due to the significant reduction in wall thickness, which determines the burst strength, make it very complicated for pipeline operators to maintain pipeline serviceability. In other words, the serviceability of gas pipelines and elbows needs to be predicted and assessed to ensure that the burst or collapse strength capacities of the structures remain less than the maximum allowable operation pressure. In this study, several positions of the corrosion in a subsea elbow made of API X42 steel were evaluated using both design formulas and numerical analysis. The most hazardous corrosion position of the aging elbow was then determined to assess its serviceability. The results of this study are applicable to the operational and elbow serviceability needs of subsea pipelines and can help predict more accurate replacement or repair times.

  12. Carbon dioxide corrosion: Modelling and experimental work applied to natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Loldrup Fosboel. P.

    2007-10-15

    CO{sub 2} corrosion is a general problem in the industry and it is expensive. The focus of this study is an oil gas production related problem. CO{sub 2} corrosion is observed in offshore natural gas transportation pipelines. A general overview of the problem is presented in chapter 1. The chemical system consists mainly of CO{sub 2}-Na{sub 2}CO{sub 3}-NaHCO{sub 3}-MEG-H{sub 2}O. Sodium is injected in the pipelines as NaOH in order to pH-stabilize the pipeline to avoid corrosion and MEG is injected in order to prevent gas hydrates. There are a great number of models available in the literature which may predict CO{sub 2} corrosion. These models are not very accurate and assume ideality in the main part of the equation. This thesis deals with aspect of improving the models to account for the non-ideality. A general overview and extension of the theory behind electrochemical corrosion is presented in chapter 2 to 4. The theory deals with the basic thermodynamics of electrolytes in chapter 2, the extension and general description of electrolyte mass transport in chapter 3, and the electrochemical kinetics of corrosion in chapter 4. A literature overview of CO{sub 2} corrosion is shown in chapter 5 and possible extensions of the models are discussed. A list of literature cites is given in chapter 6. The literature review in chapter 5 shows how FeCO{sub 3} plays a main part in the protection of steel. Especially the solubility of FeCO{sub 3} is an important factor. Chapter 7 discusses and validates the thermodynamic properties of FeCO{sub 3}. The study shows that there is a discrepancy in the properties of FeCO{sub 3}. Sets of consistent thermodynamic properties of FeCO{sub 3} are given. A mixed solvent electrolyte model is regressed in chapter 8 for the CO{sub 2}-Na{sub 2}CO{sub 3}-NaHCO{sub 3}-MEG-H{sub 2}O system. Parameters of the extended UNIQUAC model is fitted to literature data of VLE, SLE, heat excess and validated against heat capacity data. The model is also

  13. Gas Pipelines, LP and LNG, GasPipelines-This dataset represents the natural gas distribution facilities for portions of Davis, Salt Lake, and Utah Counties. These data were digitized as part of the State of Utah Comprehensive Emergency Management Earthquake Preparedness Program, 19, Published in 1990, 1:24000 (1in=2000ft) scale, State of Utah Automated Geographic Reference Center.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Gas Pipelines, LP and LNG dataset, published at 1:24000 (1in=2000ft) scale, was produced all or in part from Other information as of 1990. It is described as...

  14. Detection of Oil and Gas Pipeline Leak%油气管道泄漏检测技术

    Institute of Scientific and Technical Information of China (English)

    许旺松

    2011-01-01

    Pipeline transport was a rapidly developing field in oil and natural gas transmission because of its economical and convenient,but the leakage problem became a hazard to safe operation of pipelines,and was the main factor causing a variety of accidents.The pipeline leak detection technology was an important pipeline management techniques to prevent the leakage occurred(or after the timely detection of the leak).Therefore,the research pipeline leak detection technology for the safe operation of the pipeline was important.A systematic description of this technology,classification and comparison,and its development prospects were predicted.%管道输送因其经济方便,正在石油天然气等输送领域迅速发展,但泄漏问题已经成为危害管道安全运行、造成各种事故的主要因素。借助管道泄漏检测技术防止泄漏发生(或在泄漏发生后及时发现)是管道管理采取的重要技术手段。因此,研究管道泄漏检测技术对管道安全运行具有重要意义,本文对油气管道泄露技术进行了系统性介绍、分类和比较,并对其发展前景进行了预测。

  15. Patterns identification in supervisory systems of nuclear reactors installations and gas pipelines systems using self-organizing maps

    International Nuclear Information System (INIS)

    Self-Organizing Maps, SOM, of Kohonen were studied, implemented and tested with the aim of developing, for the energy branch, an effective tool especially for transient identification in nuclear reactors and for gas pipelines networks logistic supervision, by classifying operations and identifying transients or abnormalities. The digital system for the test was developed in Java platform, for the portability and scalability, and for belonging to free development platforms. The system, executed in personal computers, showed satisfactory results to aid in decision taking, by classifying IRIS (International Reactor Innovative and Secure) reactor operation conditions (data from simulator) and by classifying Southeast (owner: TRANSPETRO - Brazil) gas pipeline network. Various adaptations were needed for such business, as new topologies for the output layer of artificial neural network and particular preparation for the input data. (author)

  16. Pressure loss in natural gas pipelines: Experimental studies of gas-particle flow, wall roughness and drag reduction

    Energy Technology Data Exchange (ETDEWEB)

    Strupstad, Andre

    2009-05-15

    Laboratory experiments on air-particle flow were performed in a horizontal once-through flow rig, with internal pipe diameters of 24 mm. Reynolds number was 40000 - 180000, temperatures 20 deg. Celsius and pressure below 2 bara. Spherical polystyrene and magnetite particles with mean diameters from 64 mum to 175 mum were used. The pressure loss in the experiments was best expressed in terms of friction factor. Differential pressure drop gave limited information because reduction in this value was due to change in the gas properties during particle injection. The reduction in the differential pressure was due to the increase in the absolute pressure, which resulted in an increased gas density. This increased density, which with an approximately constant gas mass flow, resulted in a lower volume flow, and thereby a lower gas velocity. A lower gas velocity results in a lower differential pressure. A calculation of the friction factors, which increased, showed that these reductions in the differential pressures were not drag reductions. Roughness measurements were made on three types of surfaces with a stylus instrument: 47 epoxy coated steel surfaces as used in natural gas pipelines, 5 plexiglass surfaces used in our flow experiments, and 9 steel surfaces. The roughness profiles obtained were used to calculate amplitude roughness parameters and texture roughness parameters. Theory of gas-particle drag reduction in pipes was reviewed. Turbulence attenuation was a necessary but not a sufficient condition for drag reduction to occur. Small particle diameter was identified as an important condition for achieving drag reduction. Also, relevant parameters for achieving turbulence attenuation were identified, including the Stokes number, ratio between particle diameter and pipe diameter and the particle Reynolds number. In the flow experiments the gas friction factor increased by up to 16 % with injection of particles as compared to particle free flow. The increase depended

  17. Power-line-induced ac potential on natural-gas pipelines for complex rights-of-way configurations. Volume 1. Engineering analysis. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, M.

    1983-05-01

    While many benefits accrue from the sharing of corridors for overhead electric-power-transmission lines and buried natural-gas-transmission pipelines, the coupling of electromagnetic energy onto the natural gas transmission pipelines is an undesired consequence of this joint usage. Many common corridors include multiple power lines and pipelines with complexities such as bonds or crossovers between the pipelines and terminating pipelines or insulators. This project has resulted in the development of the methodology and techniques for analyzing such complex common-corridor coupling problems. Field tests were conducted to verify key aspects of the analysis. Two complementary methods have been developed for solving coupling problems on common corridors: a handbook that provides simplified procedures and graphical aids that can be used to analyze many less-complex common-corridor concerns, and a computer program that provides the means for analyzing a wide range of more complex configurations.

  18. Energy intensity, life-cycle greenhouse gas emissions, and economic assessment of liquid biofuel pipelines.

    Science.gov (United States)

    Strogen, Bret; Horvath, Arpad; Zilberman, David

    2013-12-01

    Petroleum fuels are predominantly transported domestically by pipelines, whereas biofuels are almost exclusively transported by rail, barge, and truck. As biofuel production increases, new pipelines may become economically attractive. Location-specific variables impacting pipeline viability include construction costs, availability and costs of alternative transportation modes, electricity prices and emissions (if priced), throughput, and subsurface temperature. When transporting alcohol or diesel-like fuels, pipelines have a lower direct energy intensity than rail, barge, and trucks if fluid velocity is under 1 m/s for 4-inch diameter pipelines and 2 m/s for 8-inch or larger pipelines. Across multiple hypothetical state-specific scenarios, profit-maximizing design velocities range from 1.2 to 1.9 m/s. In costs and GHG emissions, optimized pipelines outperform trucks in each state and rail and barge in most states, if projected throughput exceeds four billion liters/year. If emissions are priced, optimum design diameters typically increase to reduce pumping energy demands, increasing the cost-effectiveness of pipeline projects. PMID:24119498

  19. Pipeline Power

    OpenAIRE

    Hubert, Franz; Cobanli, Onur

    2012-01-01

    We use cooperative game theory to analyze the impact of three controversial pipeline projects on the power structure in the Eurasian trade of natural gas. Two of them, Nord Stream and South Stream, allow Russian gas to bypass transit countries, Ukraine and Belarus. Nord Stream's strategic value turns out to be huge, justifying the high investment cost for Germany and Russia. The additional leverage obtained through South Stream, in contrast, appears small. The third project, Nabucco, aims at ...

  20. Detecting Methane From Leaking Pipelines and as Greenhouse Gas in the Atmosphere

    Science.gov (United States)

    Riris, Haris; Numata, Kenji; Li, Steven; Wu, Stewart; Ramanathan, Anand; Dawsey, Martha

    2012-01-01

    Laser remote sensing measurements of trace gases from orbit can provide unprecedented information about important planetary science and answer critical questions about planetary atmospheres. Methane (CH4) is the second most important anthropogenically produced greenhouse gas. Though its atmospheric abundance is much less than that of CO2 (1.78 ppm vs. 380 ppm), it has much larger greenhouse heating potential. CH4 also contributes to pollution in the lower atmosphere through chemical reactions, leading to ozone production. Atmospheric CH4 concentrations have been increasing as a result of increased fossil fuel production, rice farming, livestock, and landfills. Natural sources of CH4 include wetlands, wild fires, and termites, and perhaps other unknown sources. Important sinks for CH4 include non-saturated soils and oxidation by hydroxyl radicals in the atmosphere. Remotely measuring CH4 and other biogenic molecules (such as ethane and formaldehyde) on Mars also has important implications on the existence of life on Mars. Measuring CH4 at very low (ppb) concentrations from orbit will dramatically improve the sensitivity and spatial resolution in the search for CH4 vents and sub-surface life on other planets. A capability has been developed using lasers and spectroscopic detection techniques for the remote measurements of trace gases in open paths. Detection of CH4, CO2, H2O, and CO in absorption cells and in open paths, both in the mid- IR and near-IR region, has been demonstrated using an Optical Parametric Amplifier laser transmitter developed at GSFC. With this transmitter, it would be possible to develop a remote sensing methane instrument. CH4 detection also has very important commercial applications. Pipeline leak detection from an aircraft or a helicopter can significantly reduce cost, response time, and pinpoint the location. The main advantage is the ability to rapidly detect CH4 leaks remotely. This is extremely important for the petrochemical industry

  1. 50 CFR 29.21-9 - Rights-of-way for pipelines for the transportation of oil, natural gas, synthetic liquid or...

    Science.gov (United States)

    2010-10-01

    ... transportation of oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced therefrom... Regulations § 29.21-9 Rights-of-way for pipelines for the transportation of oil, natural gas, synthetic liquid... of oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced...

  2. Gas pipeline from North Europe through Alps tunnels; Gazoduc provenant du Nord de l'Europe et passant par des tunnels sous les Alpes

    Energy Technology Data Exchange (ETDEWEB)

    Ruffa, D.; Pesaresi, G.; Raffaeli, E. [Snamprogetti, ENI Group (Italy)

    2000-07-01

    This paper summarises the peculiarities and problems faced during the design and construction phases for the implementation of some sections of the NPS 48 gas pipeline, inside several tunnels located in Swiss territory; in addition, the main aspects relevant to welding technologies and NDT (Non-Destructive Testing) are also outlined. The above mentioned pipeline sections were an integral part of the expansion plan for gas importation from the North Sea to Italy. The tunnels through which the pipeline was laid were already existing and the scope of the work was to replace the already existing NPS 34 gas pipeline and to install NPS 48 according to DIN 17172 (grade 445.7 TM or API grade 5L-X65, wall thicknesses 18.0, 21.2, 26.1 mm), subsequent to removal of the existing pipes. (authors)

  3. Sweden and the NEGP: A Pilot Study of the North European Gas Pipeline and Sweden's Dependence on Russian Energy

    International Nuclear Information System (INIS)

    Developments between 2004 and 2006 indicate that a North European Gas Pipeline (NEGP) through the Baltic Sea, from Russia to Germany, may be realised in the coming decade. This would provide Europe with yet another opportunity to diversify its import channels of gas. It is however reasonable to assume that the NEGP also could change the strategic pattern and be a source of friction. The NEGP may rock the regional stability and reduce the potential of the new EU members to become security providers in Europe's northern dimension. It also gives increased leverage and influence to Russia, a state that has moved in an authoritarian direction under President Putin. The aim of this pilot study is to elucidate on the NEGP pipeline and Sweden's increasing dependence on Russian energy. A subsidiary aim is to outline a set of concerns that have bearing on the situation for the EU and Baltic Sea Region and that need to be further addressed. In conclusion, the NEGP will enhance Russia's direct leverage on Poland, Ukraine, and Belarus, as it will allow Russia to turn off gas supplies without affecting exports to other parts of Europe. Russia will also increase its leverage over the states that will or may be connected to the NEGP (Germany, and possibly Belgium, Denmark, the Netherlands and the UK). Even if Sweden is not embracing the NEGP, it is today highly sensitive as it imports most of its energy. It is increasingly dependent on Russian oil and is partly dependent on imports of electricity from Russia. Should the NEGP materialise and Sweden becomes connected in the future, it would likely be dependent also on natural gas. It is of paramount importance for the energy security of the connected states how the pipeline is constructed and operated. If there will be technical possibilities for Russia to tamper with the flow of gas to individual states without affecting supply to others, there are tangible threats to the importing states

  4. Construction and assembly of the Urucu-Coari-Manaus gas pipeline; Construcao e montagem do gasoduto Urucu-Coari-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, Antonio E.; Sarno, Ruy [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    This paper aims to present the strategies adopted for the development of the construction and assembly of the Urucu-Coari-Manaus Gas Pipeline and its branches, emphasizing the logistics. With 662 km of extension and crossing 7 Amazonian counties, the construction of this pipeline will take in consideration particular aspects of the region (wavy relief, local population, Amazonian forest and diverse water bodies) and its interference in the works, mainly transport of workers and equipment, distribution of supplying points of fuels and foods, and localization of support work sites. Considering the importance of the region watercourses, techniques for its passages were studied, on a case by case basis and the conventional process, directional drilling and special launching for the passage of the Black river have been adopted. Moreover, this paper presents the activities summary of both environmental licensing process and pre communication related to the communities directly affected by the works, aiming at the beginning of the services of construction and assembly, as well as a story brief of the experiences gathered during the construction of the Poliduto and the Urucu-Coari Gas Pipeline, both constructed between the years of 1997 and 1999. (author)

  5. An ornithological study of alternate gas pipeline routes in Alaska, Yukon Territory and the Northwest Territories

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The study was an attempt to describe and estimate the numbers of species and relative densities of birds along the two alternate pipeline routes, and to arrive at...

  6. Modeling Hydrodynamic State of Oil and Gas Condensate Mixture in a Pipeline

    Directory of Open Access Journals (Sweden)

    Dudin Sergey

    2016-01-01

    Based on the developed model a calculation method was obtained which is used to analyze hydrodynamic state and composition of hydrocarbon mixture in each ith section of the pipeline when temperature-pressure and hydraulic conditions change.

  7. Fitness for service assessment of defects in oil and gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Teutonico, Jose Mauricio; Souza, Gerardo; Manfredi, Carlos [GIE A.S. (Argentina)

    2005-07-01

    During normal operation a pipeline generates a series of defects that can affect its integrity. At some stage during the pipeline life will require an assessment of these defects in order to determine their ability to maintain safe operation. Defects can be classified as geometric defects (gouges, plain dents, dents containing other defects), volumetric defects (external or internal corrosion) or planar defects (cracks, SCC). In this work a methodology to the characterization and determination of the severity of defects detected by an ILI inspection in pipelines is presented. A series of practical procedures and instructive has been developed based on international codes, national regulations and industry best practices. The repair approaches were defined from the risk level that the company it is disposed to assume. The contributed examples were collected in high pressure pipelines of different ages, located on diverse geographical locations and over different operation conditions. (author)

  8. 75 FR 32836 - Pipeline Safety: Workshop on Public Awareness Programs

    Science.gov (United States)

    2010-06-09

    ... Institute Interstate Natural Gas Association of America (8) Question & Answer Period. (9) Lessons Learned... challenges faced by the pipeline industry). Hazardous Liquid Gas Transmission/Gathering Natural Gas... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Workshop on Public...

  9. Recent hydrocarbon developments in Latin America: Key issues in the downstream oil sector

    Energy Technology Data Exchange (ETDEWEB)

    Wu, K.; Pezeshki, S.

    1995-03-01

    This report discusses the following: (1) An overview of major issues in the downstream oil sector, including oil demand and product export availability, the changing product consumption pattern, and refineries being due for major investment; (2) Recent upstream developments in the oil and gas sector in Argentina, Bolivia, Brazil, Chile, Colombia, Ecuador, Mexico, Peru, Trinidad and Tobago, and Venezuela; (3) Recent downstream developments in the oil and gas sector in Argentina, Chile, Colombia, Ecuador, Mexico, Peru, Cuba, and Venezuela; (4) Pipelines in Argentina, Bolivia, Brazil, Chile, and Mexico; and (5) Regional energy balance. 4 figs., 5 tabs.

  10. Recent hydrocarbon developments in Latin America: Key issues in the downstream oil sector

    International Nuclear Information System (INIS)

    This report discusses the following: (1) An overview of major issues in the downstream oil sector, including oil demand and product export availability, the changing product consumption pattern, and refineries being due for major investment; (2) Recent upstream developments in the oil and gas sector in Argentina, Bolivia, Brazil, Chile, Colombia, Ecuador, Mexico, Peru, Trinidad and Tobago, and Venezuela; (3) Recent downstream developments in the oil and gas sector in Argentina, Chile, Colombia, Ecuador, Mexico, Peru, Cuba, and Venezuela; (4) Pipelines in Argentina, Bolivia, Brazil, Chile, and Mexico; and (5) Regional energy balance. 4 figs., 5 tabs

  11. The impact of market changes on long-term take-or-pay export contracts for LNG and pipeline gas from Mena regions: lessons from Europe

    International Nuclear Information System (INIS)

    This paper examines the contracting structures and prices of liquefied natural gas (LNG) and gas pipeline projects, pricing arrangements in Great Britain, the continental West European gas price adjustment formula, and pricing of LNG transport by ship. The price review introduced in Continental North West European contracts, gas liberalisation and price shocks in Great Britain, the demise of British Gas, and gas liberalisation in continental Europe are discussed. Gas suppliers and European market liberalisation are considered, and MENA (Middle East and North Africa) gas supply arrangements, European buyers, and future price adjustment methods are addressed. (uk)

  12. Thermo-hydraulic modelling of the South East Gas Pipeline System - an integrated model; Modelagem termo-hidraulica do Sistema de Gasodutos do Sudeste : um modelo integrado

    Energy Technology Data Exchange (ETDEWEB)

    Vianna Neto, Armando M.; Santos, Arnaldo M.; Mercon, Eduardo G. [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper presents the development of an integrated simulation model, for the numerical calculation of thermal-hydraulic behaviors in the Brazilian southeast onshore gas pipeline flow system, remotely operated by TRANSPETRO's Gas Pipeline Control Centre (CCG). In its final application, this model is supposed to provide simulated results at the closer range to reality, in order to improve gas pipeline simulation studies and evaluations for the system in question. Considering the fact that numerical thermo-hydraulic simulation becomes the CCG's most important tool to analyze the boundary conditions to adjust the mentioned gas flow system, this paper seeks and takes aim to the optimization of the following prime attributions of a gas pipeline control centre: verification of system behaviors, face to some unit maintenance stop or procedure, programmed or not, or to some new gas outlet or inlet connection to the system; daily operational compatibility analysis between programmed and realized gas volumes; gas technical expedition and delivery analysis. Finally, all this work was idealized and carried out within the one-phase flow domain (dry gas) (author)

  13. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Science.gov (United States)

    2012-10-11

    ... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Communication During Emergency Situations AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice..., hazardous liquid, and liquefied natural gas pipeline facilities that operators should immediately...

  14. Creep Stress Analysis of Flue Gas Pipeline%烟气管道的高温蠕变应力分析

    Institute of Scientific and Technical Information of China (English)

    董晓敏; 赵海杰

    2014-01-01

    Some high temperature flue gas pipelines of petrochemical enterprises always run in 650 ~ 700 or so℃ for a long time. The researches show that the creep temperature of carbon steel pipeline is about 350 ℃, the creep temperature of alloy steel pipeline is about 420 ℃, the creep temperature of stainless steel pipeline is about 480 ℃.In this paper, by analyzing the operation conditions of an original high temperature flue gas export pipeline in a petrochemical plant, the pipeline arrangement was optimized by using stress analysis software CAESARII. The safety about the service life of pipeline under the condition of creep was assessed through calculating.%石油化工厂的部分高温烟气管道长期在650~700℃左右运行,研究表明,碳钢部件工作温度高于350℃、合金钢部件工作温度超过420℃、不锈钢部件工作超过480℃时,进入蠕变温度。通过对某石化厂原有高温烟气出口管道运行工况分析,运用 CAESARII 应力分析软件优化管道布置,并通过计算管道蠕变条件下服役年限进行安全评定。

  15. Multi-criteria aid for group decision making on gas pipeline risk analysis; Apoio multicriterio a decisao em grupo na analise de risco em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Yuri G.; Cavalcante, Cristiano A.V.; Brito, Anderson J. de M.; Almeida, Adiel T. de [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil)

    2008-07-01

    Risks are, by nature, subjective, and therefore, complex. They present multidimensional aspects and involve various stakeholders. The pipelines transmission and distribution of natural gas (NG) involve various scenarios of risks, resulting from the distinct environments where the supply chain of NG is inserted. This paper proposes a multi criteria model for group decision support, based on the GDSS PROMETHEE approach, for risk assessment in pipelines sections. The proposed model aims to establish a ranking between the sections of a pipeline network, in order to provide insights to the definition of risk mitigation actions. (author)

  16. Gas Pipelines, LP and LNG, Pipelines-This data set represents the oil and gas transmission pipelines in Utah and portions of Arizona, Colorado, Idaho, Nevada and New Mexico that appear on the 1:100,000 scale topographical map series from the U. S. Geological Survey (USGS)., Published in 2001, 1:100000 (1in=8333ft) scale, State of Utah Automated Geographic Reference Center.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Gas Pipelines, LP and LNG dataset, published at 1:100000 (1in=8333ft) scale, was produced all or in part from Other information as of 2001. It is described as...

  17. Surface electromagnetic technology for the external inspection of oil and gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mousatov, A.; Nakamura, E.; Delgado, O.; Flores, A. [Mexican Petroleum Institute, Mexico City (Mexico); Nakamura, E. [Moscow State University, Moscow (Russian Federation); Shevnin, V. [Moscow State University (Russian Federation)

    2009-07-01

    In this paper we present a surface electromagnetic technology for the non-destructive pipeline coating inspection (SEMPI). This technology allows: determination of the depth and plane position of pipelines, quantitative evaluation of the insulation resistance and delimitation of zones with coating damages, estimation of the performance of the cathodic protection system (CPS) and detection of its connections to out-of-service pipes and other grounded constructions, and assessment of the soil aggressively. The SEMPI technology is based on the approximation of pipelines by heterogeneous transmission lines with variable leakage conductance and pipe impedance to represent insulation coating and wall thickness damages. Based on the result of simulations, we have optimized the field measurements and developed the interpretation procedure of experimental data. The field operations include surface measurements of magnetic field, voltage on the control posts of the CPS and soil resistivity. In zones with coating damages the detailed measurements can be performed using magnetic or electric field to increase the resolution in localizing and evaluating the insulation damages. The SEMPI technology has been applied for inspections of pipelines with different technical characteristics in complicated environmental conditions. The examples presented in this work confirm the high efficiency of the developed technology for external integrity evaluation of pipelines. (author)

  18. GIS as a practical and powerful tool for gas pipeline design and planning; GIS como ferramenta pratica e poderosa para projeto e planejamento de gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney P. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Gas pipeline design and planning requires the management of huge quantity of information related to environmental, socio-economic and engineering data. To optimize the design process and guarantee a high level of quality and reliability a GIS solution was implemented that proved to be worth taking and adopted the state of the art of the technology available in the market. This paper will present the GIS solution implemented at PETROBRAS Gas and Energy based on APDM, a pipeline data model that is a result of a joint work that has been developed by specialized worldwide oil and gas companies. Two applications developed in house will also be presented, one is the application called Scenario Builder that is related to gas pipeline thermo-hydraulic simulation fully integrated with GIS technology and the other is called Project Viewer that provides different ways of having quick access and visualization of the existing and ongoing projects. (author)

  19. GENDER AND PUBLIC PARTICIPATION: A STUDY OF THE SWEDISH PUBLIC DEBATE ON THE NORD STREAM GAS PIPELINE FROM A GENDER PERSPECTIVE

    OpenAIRE

    MISSE WESTER; CAMILLA MÖRN

    2013-01-01

    This article focuses on public participation in Sweden during the planning of the Nord Stream gas pipeline. The pipeline runs from Russia to Germany, and passes close to the Swedish island of Gotland. Results from a survey study conducted among 990 Swedish citizens, where 200 respondents are residents on the island of Gotland, reveal that there are differences between men and women in how risks with this project were perceived. More women than men expressed a desire for more participatory pro...

  20. Open access to natural gas pipeline transportation in North America: Lessons for the European internal energy market

    International Nuclear Information System (INIS)

    The North American natural gas industry's experience with deregulation is described, with emphasis on the transition to competition and the conditions for viability under open access. Lessons learned from the North American experience are then examined for relevance to the European situation, which is emphasizing greater access to transmission systems. It is found likely that the European proposal will frequently operate only to facilitate negotiations among players already active in the gas market, and is less likely to introduce a large number of independent transactions or new merchants. Challenges for the system will include: government assurance of reliability to domestic gas users who have made arrangements with foreign suppliers; administration of pipeline grids; resolution of competing claims on available transmission services; planning for future suppliers; and impact on investment. 8 refs., 1 fig

  1. Integration of Wind Energy, Hydrogen and Natural Gas Pipeline Systems to Meet Community and Transportation Energy Needs: A Parametric Study

    Directory of Open Access Journals (Sweden)

    Shahryar Garmsiri

    2014-04-01

    Full Text Available The potential benefits are examined of the “Power-to-Gas” (P2G scheme to utilize excess wind power capacity by generating hydrogen (or potentially methane for use in the natural gas distribution grid. A parametric analysis is used to determine the feasibility and size of systems producing hydrogen that would be injected into the natural gas grid. Specifically, wind farms located in southwestern Ontario, Canada are considered. Infrastructure requirements, wind farm size, pipeline capacity, geographical dispersion, hydrogen production rate, capital and operating costs are used as performance measures. The model takes into account the potential production rate of hydrogen and the rate that it can be injected into the local gas grid. “Straw man” systems are examined, centered on a wind farm size of 100 MW integrating a 16-MW capacity electrolysis system typically producing 4700 kg of hydrogen per day.

  2. 中亚天然气管道发展现状与特点分析%Development and characteristics of Central Asian Natural Gas Pipelines

    Institute of Scientific and Technical Information of China (English)

    党学博; 李怀印

    2013-01-01

    Adjacent to China,Central Asia has significant geographic advantages on the pipelined natural gas trade.To make a good use of the natural gas resources in Central Asia,this paper makes a systematic research on the present development,distribution and recent development plan of the natural gas pipelines of Kazakhstan,Uzbekistan and Turkmenistan.Meanwhile,the paper also makes a detailed introduction to the significant natural gas export pipelines,including the Central Asia-Central District Gas Pipeline,Central Asia-China Gas Pipeline,Bukhara-Urals Gas Pipeline and Turkmenistan-Iran Gas Pipeline.Then the characteristics of the long-distance gas pipelines in Central Asia are summarized,including the uneven distribution of the pipelines,severe corrosion,difficulties in safe operation and control by national petroleum corporations or their subsidiary companies.%中亚与中国毗邻,管道天然气贸易拥有显著的地缘优势.为了更好地利用中亚天然气资源,系统研究了中亚地区哈萨克斯坦、乌兹别克斯坦、土库曼斯坦3国的天然气管道发展现状、分布特点及近期发展规划,详细介绍了中亚—中央、中亚—中国、布哈拉—乌拉尔、土库曼斯坦—伊朗等重要的天然气出口管道.在此基础上,总结了中亚天然气长输管道的特点,包括管道地区分布不均匀、腐蚀严重、安全运营难度大、基本被国家石油天然气公司或其子公司控制等.

  3. Dry hyperbaric gas metal arc welding of subsea pipelines: experiments and modeling

    Energy Technology Data Exchange (ETDEWEB)

    Azar, Amin S.

    2012-07-01

    Ambitions in exploration of oil and gas fields at deeper water depth require continuous investigation and maintenance. The transportation pipelines laid in deep waters are both subjected to corrosion and buckling due to environmental phenomena. They may also often undergo branching (namely hot tapping) to redirect (or add to) the transportation paths. Mechanical joints and welding are both considered as available alternatives when sectioning and replacement of the pipes at shallow waters is necessary, yet, welding is more promising for deep waters where remote operation is central. Fusion welding on the other hand comprises several technological detractions for sound operations under high ambient pressures disregarding its low cost and flexibility. The foremost detracting phenomenon in the arc welding is called 'arc root constriction', which is defined as arc geometry shrinkage under the increased pressure. Consequently, the power delivery to the weld pool at different pressure levels is a major worry. Effects of ionization and dissociation energies of different gases and mixtures, partial pressure of environmental gases including hydrogen and oxygen, gasification and degasification of the weld metal, inclusions that affect the phase transformation, absorption and desorption kinetics, oxidation and deoxidation reactions and many more are the phenomena that can possibly be altered by the gas type and ambient pressure level. Spattering and fume generation is a problematic issue since the arc is rather unstable under high pressure. Thus, seeking the effect of different chamber gas mixtures on welding parameters, final microstructure and mechanical properties is the main objective of this work.Statistical analysis of the collected voltage and current waveforms is carried out to identify the source of arc misbehavior and instability (discussed in Paper I). The stochastic parameters is related to the electrical stability and resolved into a number of varying

  4. Methanol incorporation in clathrate hydrates and the implications for oil and gas pipeline flow assurance and icy planetary bodies

    OpenAIRE

    Shin, Kyuchul; Udachin, Konstantin A.; Moudrakovski, Igor L.; Leek, Donald M.; Alavi, Saman; Ratcliffe, Christopher I.; Ripmeester, John A.

    2013-01-01

    One of the best-known uses of methanol is as antifreeze. Methanol is used in large quantities in industrial applications to prevent methane clathrate hydrate blockages from forming in oil and gas pipelines. Methanol is also assigned a major role as antifreeze in giving icy planetary bodies (e.g., Titan) a liquid subsurface ocean and/or an atmosphere containing significant quantities of methane. In this work, we reveal a previously unverified role for methanol as a guest in clathrate hydrate c...

  5. Reestablishment of wetland vegetation on gas pipeline rights-of-way in six different wetland ecosystems

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, R.E. Shem, L.; Wilkey, P.L. (Argonne National Lab., IL (United States)); Van Dyke, G.D. (Trinity Christian Coll. Palos Heights, IL (United States)); Hackney, C. (North Carolina Univ., Wilmington, NC (United States)); Gowdy, M. (Institute of Technology, Chicago, IL (United States))

    1992-05-01

    Vegetational surveys were carried out to compare reestablished vegetation on pipeline rights-of-way (ROWS) with that in adjacent natural ecosystems undisturbed by pipeline installation. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the ROW approximated or exceeded those in the adjacent natural area. In four ecosystems, the vegetation on the ROW was limited to a herbaceous layer by ROW maintenance; thus, the ROWs often involved a complex of species quite different from that found in the adjacent ecosystems.

  6. 加快管道建设是促进天然气消费的重要途径%Speed up the Pipeline Construction is the Major Way to Promote Gas Consumption

    Institute of Scientific and Technical Information of China (English)

    戚爱华

    2011-01-01

    管道运输作为天然气最主要的运输方式,在天然气的发展中起十分重要的作用.管道建设带动了天然气消费快速上升,管道运输使天然气消费区域扩大,使用气结构更趋合理.因此,大力发展天然气,管道运输必须先行.%As the main transportation way, pipelines have played a very important role in gas development.Pipeline construction has brought the rapidly rising of gas consumption. Pipeline transportation has expanded gas consumption area and made the gas utilization structure more reasonable. Therefore, to develop natural gas should develop pipelines first. To speed up gas pipeline construction and facilitate gas utilization is the implementation of the development in a green low carbon way.

  7. Gas supermarket: Dawn pipeline junction rises as a trading hub on a continental scale in southwestern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Faulkner, P.

    1999-11-01

    Dawn, Ontario, a small farming community near Sarnia's famed chemical valley is the site of the Union Gas Dawn Operations Centre. The region's capacity to store gas in geological formations beneath fertile fertile farm land will be used more and more with the completion of pipelines that will transmit more Alberta natural gas to markets in the eastern United States through Ontario. Its central location, a growing Ontario-Quebec market and prospects of more incoming gas appear to have conferred upon Dawn the status of a premier trading hub in Canada and maybe in North America, spurred on by regulatory regimes on both sides of the border that favour free trade in natural gas and the growing demand in the previously under-served northeastern United States materialize. The Dawn center trades gas for more than 100 energy companies, several of them electricity providers, that have been recently allowed to step into the market territory formerly occupied by Ontario Hydro. Natural gas is replacing coal burning power stations and to some extent, nuclear power in Ontario; the trend is also strong in the New England states, hence future demand for natural gas is likely to increase. It is this reasoning that underlies the construction of new pipelines, such as the Alliance Project, which will move gas from Alberta into the United States, back to Canada at Dawn, then back again into New York. If all goes according to plan, another new route called Millennium will run east from Dawn than travel under Lake Erie to join the Columbia Gas System that feeds New York City. Another line -- Vector -- that will geographically diversify west-east trading capabilities, also received FERC and NEB approval early in 1999. Yet another line by TriState, initially denied a US permit, recently received preliminary FERC approval, conditional upon approval by NEB. It is easy to see that with the spread of deregulation and competition, Dawn's role as a trading hub and as a storage

  8. Northern entanglement : Arctic gas pipeline plans caught in web of competing interests, but dire supply-demand forecasts indicate line will be built

    International Nuclear Information System (INIS)

    This article discussed land access and regulatory issues surrounding decisions to stop field work of the Mackenzie Valley pipeline in the spring of 2005. Although current supply and demand balances in natural gas markets argue that the pipeline will be beneficial, Imperial Oil and its partners have halted activities such as geotechnical data-gathering programs and preparatory work on contracting construction. The project's future depends on the successful resolution of First Nations land claims, governmental disputes and various activist groups protesting the pipeline's construction. Imperial Oil has suggested that the pipeline presents a significant opportunity for the people of the North to reduce their reliance on government and will create jobs and business opportunities for Aboriginal people. In the aftermath of work stoppage, Alberta's former Energy Minister stated that imports of Liquefied Natural Gas (LNG) and Alaska gas from the proposed Alaska Highway Pipeline Project may arrive on the market in advance of the Mackenzie Valley project, which would affect the project's financial future. It was noted that access and benefits agreements with First Nations stakeholders have yet to be reached. Lawsuits involving the Deh Cho First Nations were examined. It was also suggested that Imperial Oil has not included information on the Alberta portion of the project in its environmental impact assessment. It was concluded that if the Mackenzie Delta line isn't in service by 2010, North American consumers can expect to spend an extra $190 billion on gas from 2011 to 2020. 3 figs

  9. Planning of remote CP system monitoring for a new long-distance gas pipeline; Planung der KKS-Fernueberwachung einer neuen Ferngasleitung

    Energy Technology Data Exchange (ETDEWEB)

    Barthel, Juergen [Max Streicher GmbH und Co. KGaA, Delitzsch (Germany); Bette, Ulrich [Labor fuer Korrosionsschutz und Elektrotechnik der Technischen Akademie Wuppertal e.V., Wuppertal (Germany); Ewert, Mirko; Rau, Frank [Wingas GmbH und Co. KG, Kassel (Germany)

    2009-05-15

    The publication of DVGW Code GW 16 set off renewed discussion of the preconditions which a remote CP monitoring system for long-distance gas pipelines must fulfil in order to permit reduction of the labour and financial input for monitoring measurements in accordance with GW 10. Referred to DVGW Code GW 16 published in May, 2008, in which, inter alia, the categories were further differentiated, this would signify Category 2c, which requires verification of the effectiveness of the CP system for the entire protected system and the detection of wrapping fault points that are not completely protected. WINGAS began considering the optimization of the remote monitoring of new long-distance gas pipelines in mid-2003, since which time the ideas discussed have been updated in the context of the planned construction of new long-distance gas pipelines. This article outlines these considerations from the starting point up to the current planning status. (orig.)

  10. Calculating the Optimum Angle of Filament-Wound Pipes in Natural Gas Transmission Pipelines Using Approximation Methods.

    Science.gov (United States)

    Reza Khoshravan Azar, Mohammad; Emami Satellou, Ali Akbar; Shishesaz, Mohammad; Salavati, Bahram

    2013-04-01

    Given the increasing use of composite materials in various industries, oil and gas industry also requires that more attention should be paid to these materials. Furthermore, due to variation in choice of materials, the materials needed for the mechanical strength, resistance in critical situations such as fire, costs and other priorities of the analysis carried out on them and the most optimal for achieving certain goals, are introduced. In this study, we will try to introduce appropriate choice for use in the natural gas transmission composite pipelines. Following a 4-layered filament-wound (FW) composite pipe will consider an offer our analyses under internal pressure. The analyses' results will be calculated for different combinations of angles 15 deg, 30 deg, 45 deg, 55 deg, 60 deg, 75 deg, and 80 deg. Finally, we will compare the calculated values and the optimal angle will be gained by using the Approximation methods. It is explained that this layering is as the symmetrical. PMID:24891748

  11. Replacement of 13 valves by using an isolation plug in the 20 inches diameter main offshore gas pipeline at Cantarell oil field, Campeche Bay, Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Carvahal Reyes, Jorge Omar; Ulloa Ochoa, Carlos Manuel [PEMEX, Exploracion y Produccion, MX (Mexico)

    2009-12-19

    In 2002 we changed 13 valves on deck of one gas production platform called Nohoch-A-Enlace at Cantarell Offshore Oil Field. The 20'' diameter gas pipeline and 200 km of length, transport and deliver gas for others production platforms in the Gas Lift System, So 2 millions of oil barrels per day depends of the operation of this gas pipeline but there was 13 valves on pig traps to be changed after 20 years of service to high pressure (64 to 63 kg/cm{sup 2}). We could not stop the operation of this pipeline and some little gas leaks were eliminated in some parts of the valves. This pipeline has two risers so the gas can be injected by two sides of the ring of 20 Km. So we found the proper technology in order to isolate one riser nad change 8 valves and the isolate the other and change the 5, and the gas lift system never stop during the plug and maintenance operations on platform. In the first isolation plug operation this tool run 20 mts inside the riser and was actionated and resists 65 Kg/cm{sup 2} of gas pressure during 44 hours so we changed 8 valves: 2 of 20'', 2 of 10'', 3 of 4'' and 1 of 8'' diameter. In the second isolation the plug run 30 mts inside the second risers and resist 64 Kg/cm{sup 2} of gas during 46 hours and we changed 5 valves of 20'' diameter. In the paper I will describe all the details of this successful operations and procedures. Also the aspects of Health, Security and Environment that we prepared one year before this operations at platform. Pemex save almost 2.5 millions of dollars because the gas lift system never stop and all valves were changed and now we can run cleaning and inspection tools inside the full ring. We used the first isolation plug in Latin America and we want to share this experience to all the pipeline operators in the world as a good practice in pipeline maintenance using plugging technology in the main and large pipelines of high pressure. (author)

  12. Microbial corrosion and cracking in steel. A concept for evaluation of hydrogen-assisted stress corrosion cracking in cathodically protected high-pressure gas transmission pipelines

    DEFF Research Database (Denmark)

    Nielsen, Lars Vendelbo

    of high-strength pipeline steel and the concentration of hydrogen present in the steel. B. Determine the degree hydrogen absorption by cathodically protected steel exposed in natural soil sediment, which include activity of sulphate-reducing bacteria (SRB). C. Compare the above points with fracture......An effort has been undertaken in order to develop a concept for evaluation of the risk of hydrogen-assisted cracking in cathodically protected gas transmission pipelines. The effort was divided into the following subtasks: A. Establish a correlation between the fracture mechanical properties...... mechanical considerations on the level of stress intensity actually present in pipelines during normal operational conditions. The results were used for a discussion - based on well established fracture mechanical relations - on which set of conditions (CP-level and operating pipeline pressure) could give...

  13. The new gas law and the concession of use of pipeline; A nova lei do gas e a concessao para uso de gasoduto

    Energy Technology Data Exchange (ETDEWEB)

    Fiad, Patricia S. [Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil). Faculdade de Direito; Lima, Juliana Cardoso de [Escritorio Doria, Jacobina, Rosado e Gondinho Advogados, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The development of the gas industry and the recent energy crises in Latin America demand an adequate answer from the legal framework. There are three main projects in course in Legislative which aim at regulating the gas industry specifically: Law Project n. 226 of 2005, of ex-senator Tourinho; Law Project n. 6.673 of 2006, of Executive; and Law Project n. 6.666 of 2006, of Deputy Luciano Zica. The pipeline is the materialization of the integration among the countries of the continent. The adoption of mechanisms to make feasible the regional integration and to stimulate the private sector, in order to react against the progressive deficit between consumption and exploration of energy, becomes fundamental to the industry. In compliance with the current legislation, the transportation of gas is made through authorization. The discussion focus on the possibility of public tender for concession of the service and how it would stimulate the market. (author)

  14. Dry hyperbaric gas metal arc welding of subsea pipelines: experiments and modeling

    Energy Technology Data Exchange (ETDEWEB)

    Azar, Amin S.

    2012-07-01

    Ambitions in exploration of oil and gas fields at deeper water depth require continuous investigation and maintenance. The transportation pipelines laid in deep waters are both subjected to corrosion and buckling due to environmental phenomena. They may also often undergo branching (namely hot tapping) to redirect (or add to) the transportation paths. Mechanical joints and welding are both considered as available alternatives when sectioning and replacement of the pipes at shallow waters is necessary, yet, welding is more promising for deep waters where remote operation is central. Fusion welding on the other hand comprises several technological detractions for sound operations under high ambient pressures disregarding its low cost and flexibility. The foremost detracting phenomenon in the arc welding is called 'arc root constriction', which is defined as arc geometry shrinkage under the increased pressure. Consequently, the power delivery to the weld pool at different pressure levels is a major worry. Effects of ionization and dissociation energies of different gases and mixtures, partial pressure of environmental gases including hydrogen and oxygen, gasification and degasification of the weld metal, inclusions that affect the phase transformation, absorption and desorption kinetics, oxidation and deoxidation reactions and many more are the phenomena that can possibly be altered by the gas type and ambient pressure level. Spattering and fume generation is a problematic issue since the arc is rather unstable under high pressure. Thus, seeking the effect of different chamber gas mixtures on welding parameters, final microstructure and mechanical properties is the main objective of this work.Statistical analysis of the collected voltage and current waveforms is carried out to identify the source of arc misbehavior and instability (discussed in Paper I). The stochastic parameters is related to the electrical stability and resolved into a number of varying

  15. Hot tapping and plugging in gas pipeline - GASCAB-I and GASDUC-I; Furacao em carga e plugueamento em gasodutos - GASCAB-I e GASDUC-I

    Energy Technology Data Exchange (ETDEWEB)

    Borges, Jeziel; Ciuffo, Mauro Cunha; Santa Cruz, Sergio de Freitas [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    It is difficult to accomplish interventions avoiding the shutdown on of the main lines during the operation of process plants or gas pipelines. It involves unit halt as well supply contract interruption, which can result heavy financial penalties with fines or cost due to profit loss. In such case it is necessary to use special techniques as hot tapping or line plugging. This paper aim to present the technical feasibility of applying line-plugging technique in a gas pipeline submitted to high pressure (82 kg f/cm{sup 2}) in non-straight section. It also presents the technical feasibility of repairing the fastening system of the connection plug. (author)

  16. China Construct Third West-East Pipeline to Boost Gas Supply

    Institute of Scientific and Technical Information of China (English)

    Liu Yan

    2012-01-01

    The third pipeline is a key project approved in 2012 by the State Council. The new project is expected to cost 125 billion yuan (US$19.7 billion) to build. The CNPC, Baosteel and China"s Social Security Fund agreed in May 2012 to jointly invest in the scheme through a joint venture company. The project is also open to private investment. As the top shareholder of the joint venture company, CNPC holds a 52-percent stake.

  17. 77 FR 5472 - Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations

    Science.gov (United States)

    2012-02-03

    ... amendments to the pipeline safety regulations (76 FR 73570). On January 12, 2012, the Interstate Natural Gas... Pipeline and Hazardous Materials Safety Administration 49 CFR Parts 191, 192 and 195 RIN 2137-AE59 Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations AGENCY: Pipeline and Hazardous...

  18. A hybrid Delphi-SWOT paradigm for oil and gas pipeline strategic planning in Caspian Sea basin

    International Nuclear Information System (INIS)

    The Caspian Sea basin holds large quantities of both oil and natural gas that could help meet the increasing global demand for energy resources. Consequently, the oil and gas potential of the region has attracted the attention of the international oil and gas industry. The key to realizing the energy producing potential of the region is the development of transnational export routes to take oil and gas from the landlocked Caspian Sea basin to world markets. The evaluation and selection of alternative transnational export routes is a complex multi-criteria problem with conflicting objectives. The decision makers (DMs) are required to consider a vast amount of information concerning internal strengths and weaknesses of the alternative routes as well as external opportunities and threats to them. This paper presents a hybrid model that combines strength, weakness, opportunity and threat (SWOT) analysis with the Delphi method. - Highlights: ► The evaluation and selection of the pipeline routes is a multi-criteria problem. ► A hybrid SWOT-Delphi method is proposed to evaluate five potential routes. ► The Southern and Northern routes are chosen as the best and second-best options. ► The second best option is identified to provide some degree of diversification.

  19. Push Force Analysis of Anchor Block of the Oil and Gas Pipeline in a Single-Slope Tunnel Based on the Energy Balance Method.

    Science.gov (United States)

    Yan, Yifei; Zhang, Lisong; Yan, Xiangzhen

    2016-01-01

    In this paper, a single-slope tunnel pipeline was analysed considering the effects of vertical earth pressure, horizontal soil pressure, inner pressure, thermal expansion force and pipeline-soil friction. The concept of stagnation point for the pipeline was proposed. Considering the deformation compatibility condition of the pipeline elbow, the push force of anchor blocks of a single-slope tunnel pipeline was derived based on an energy method. Then, the theoretical formula for this force is thus generated. Using the analytical equation, the push force of the anchor block of an X80 large-diameter pipeline from the West-East Gas Transmission Project was determined. Meanwhile, to verify the results of the analytical method, and the finite element method, four categories of finite element codes were introduced to calculate the push force, including CAESARII, ANSYS, AutoPIPE and ALGOR. The results show that the analytical results agree well with the numerical results, and the maximum relative error is only 4.1%. Therefore, the results obtained with the analytical method can satisfy engineering requirements.

  20. 76 FR 70217 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-11-10

    ... ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.'' That final rule... 72878), titled ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements... the Federal Register of its intent to create a national registry of pipeline and liquefied natural...

  1. Technological Change and Its Labor Impact in Five Energy Industries. Coal Mining/Oil and Gas Extraction/Petroleum Refining/Petroleum Pipeline Transportation/Electric and Gas Utilities.

    Science.gov (United States)

    Bureau of Labor Statistics (DOL), Washington, DC.

    This bulletin appraises major technological changes emerging in five American industries (coal mining, oil and gas extraction, petroleum refining, petroleum pipeline transportation, and electric and gas utilities) and discusses the impact of these changes on productivity and occupations over the next five to ten years. Its separate reports on each…

  2. FRACTAL RESEARCH ON CRACKS PROPAGATION OF GAS PIPELINE X52 STEEL WELDING LINE UNDER HYDROGEN ENVIRONMENT

    Institute of Scientific and Technical Information of China (English)

    S.H. Dong; Y.M. Lu; Y. Zhang; Q. Wu

    2001-01-01

    Based on the theory of hydrogen enhanced localized plasticity of the hydrogen induced cracking and considered the effect of residual stress produced by eliminated stress heattreatment, a fractal model of hydrogen induced cracking was presented, and a relationship among the effective surface energy T( H), fractal dimension D and stress intensity factor of hydrogen induced cracking, KIH, for welding pipeline under hydrogen environment was set up, from which the relationship of D and KIsCC is obtained. The model was verified experimentally to be correct.

  3. Research on On-line detection system for natural gas pipeline

    Institute of Scientific and Technical Information of China (English)

    Zuo Jianyong; Yan Guozheng; Ding Guoqing; Fu Xiguang; Zhang Yunwei

    2005-01-01

    Four methods for testing the thickness and defect of pipeline are compared and analyzed in this paper. The testing principle of magnetic leakage flux based on electromagnetism is discussed in detail. From the experiments of sensor character, the effects caused by some factors are found, which give some important information for sensor design, and this method is proved reasonable and effective. The mechanical and electrical structures of inspection equipment, as well as its working principle and technical features are introduced. In this paper, control flow and software design are discussed, too. This detection system has been successfully developed. Experiments show that this detection system has high resolution and can be put into practice.

  4. State and residual service life of gas and water pipelines of the first PE generation. Results of a DVGW research project; Integritaet von PE-Gas- und Wasserleitungen der ersten Generation. Ergebnisse eines DVGW-Forschungsvorhabens

    Energy Technology Data Exchange (ETDEWEB)

    Wuest, Juergen; Wenzel, Mirco [SKZ, Wuerzburg (Germany); Scholten, Frans; Wolters, Mannes [Kiwa Gas Technology, Apeldoorn (Netherlands); Heinemann, Juergen; Bockenheimer, Alexander [Technische Univ. Darmstadt (DE). Staatliche Materialpruefungsanstalt Darmstadt (MPA)

    2010-10-15

    Within the scope of a DVGW research project the KIWA, SKZ and MPA Darmstadt research institutes examined the condition and possible residual service life of gas and water pipelines of the first PE generation operating for more than 30 years. The creep rupture curves determined on the old pipelines are very similar to the ones ascertained approx. 40 years ago, allowing an extrapolation over at least another 25 years at service temperature upon expiry of the originally predicted service life of 50 years. Both the gas and water pipelines still show an actively effective thermal stabilization so that an early thermo-oxidative failure is not to be expected even after expiry of the originally estimated service life of 50 years. Nevertheless, public utilities operating gas and water pipelines made of PE of the first generation are recommended to closely observe the damage statistics/damage progression within the scope of the regular inspections of the pipeline network, thus being in a position to recognise ageing phenomena which indicate an end of the service life of the pipeline system in time and perform further examinations. (orig.)

  5. Quasi-distributed region selectable gas sensing for long distance pipeline maintenance

    International Nuclear Information System (INIS)

    In this work, a novel optical gas tele-monitoring concept is proposed. By following this concept, we construct a long distance region selectable gas sensing system, which can address gases of single and/or different types at multi-locations. This approach is based on optical spectroscopy of selected absorption lines of gas leakage. A gas line spectrum can be addressed from a long distance monitoring center using optical fiber, gas sensing region and region selector. The region selecting technique monitors the selected gas absorption and identifies the location of it simultaneously. The technique has potential to be applied to long distance lightweight fiber optic wide-region gas sensing. A multi-region tele-monitoring experiment using FBG monitor as spectroscopy unit, long propagation fibers, gas cells as leakage sensing regions and FBGs as region selectors is demonstrated. Available numbers and coverage of multi-sensing regions are estimated using loss of sensing unit and propagation. (paper)

  6. 基于城市燃气管道防腐设计的研究%Research on the Anticorrosion Design of Urban Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    王有之

    2015-01-01

    作为城市发展的重要燃气资源,天然气的正常输送是保障社会效益和企业经济效益的关键。为保证燃气资源的输送质量,必须采取有效措施控制燃气管道的腐蚀,尽可能减少燃气输送安全事故,降低管道输送成本,提高燃气输送的安全性。主要深入探究了城市燃气管道防腐设计的相关内容。%As the important gas resource of urban development, the normal transportation of natural gas is the key to protect the social benefit and the economic benefit of the enterprise. In order to ensure the transportation quality of gas resources, we must take effective measures to corrosion control of gas pipeline, as far as possible to reduce safety accidents in gas transportation, reducing the transportation cost of a pipeline, to improve the safety of gas transmission. The contents of anticorrosion design for urban gas pipeline are mainly explored in the main.

  7. 天然气管道泄漏扩散规律的数值模拟%Simulation study of natural gas pipeline leakage accident

    Institute of Scientific and Technical Information of China (English)

    刘寰宇; 林杭; 李晋; 卢江涛; 程猛猛

    2014-01-01

    近年来,由于天然气管道泄漏而导致火灾、爆炸的风险,对群众的安全、企业财产和环境等造成极大的威胁,因此,通过分析管道的泄漏模型,制定相应的对策保障天然气管道系统的安全、可靠的运行是非常有意义的。本文利用FLUENT对天然气管道泄漏扩散规律迚行了数值模拟,得到了甲烷的扩散规律及浓度分布规律,为有效预测天然气泄漏扩散的影响范围提供了依据。%Inrecent years, due to the natural gas pipeline leak and cause a risk of fire, explosion, the safety of people, property and the environment, such as enterprise caused great threat, therefore, through the analysis of pipeline leakage model to develop appropriate measures to protect the security of natural gas pipeline system and reliable operation is very meaningful. In this paper, FLUENT for natural gas pipeline leak was simulated diffusion law, has been the proliferation of rules and distribution of methaneconcentration, provide a basis for predicting the scope of effective diffusion of gas leaks.

  8. Study on safety management of long distance natural gas pipeline%天然气长输管道安全管理研究

    Institute of Scientific and Technical Information of China (English)

    陈云; 于培林

    2015-01-01

    对天然气长输管道的安全管理进行研究分析,探讨加强安全管理方法.%This paper investigates the safety management of natural gas pipeline to offer advice of strengthening safety management.

  9. Pipeline engineering

    CERN Document Server

    Liu, Henry

    2003-01-01

    PART I: PIPE FLOWSINTRODUCTIONDefinition and Scope Brief History of PipelinesExisting Major PipelinesImportance of PipelinesFreight (Solids) Transport by PipelinesTypes of PipelinesComponents of PipelinesAdvantages of PipelinesReferencesSINGLE-PHASE INCOMPRESSIBLE NEWTONIAN FLUIDIntroductionFlow RegimesLocal Mean Velocity and Its Distribution (Velocity Profile)Flow Equations for One-Dimensional AnalysisHydraulic and Energy Grade LinesCavitation in Pipeline SystemsPipe in Series and ParallelInterconnected ReservoirsPipe NetworkUnsteady Flow in PipeSINGLE-PHASE COMPRESSIBLE FLOW IN PIPEFlow Ana

  10. Countermeasures and Suggestions of Environmental Management of oil and gas Pipeline Disposal%油气管道弃置环境管理对策建议

    Institute of Scientific and Technical Information of China (English)

    杨爽

    2014-01-01

    在对我国油气废弃管道进行潜在环境影响分析的基础上,借鉴欧美发达国家油气废弃管道环境管理经验,指出了我国老旧管道环境管理存在的老旧管道现状不清、环境风险隐患大,管道弃置环境管理缺失,管道弃置技术薄弱、基础研究不足等问题,提出了开展现状调查、摸清底数、评估风险,明确主体责任、建立管道环境管理机制,开展相关试点研究、建立弃置管理技术规范,开展管道规划,优化新线路由等对策建议。%On the basis of potential environmental impact analysis of waste oil and gas pipeline in our country,Learning from the developed countries in Europe and America oil and gas waste pipeline environment management experience, the Article point out the existing problerm that environmental situation of the old pipeline is not clear, the hidden environmental risks is bigger, environmental management of disposed pipeline is deficiencied, disposal technology of pipeline is weak, basic research is lack. So the Article proposes countermeasures and suggestions that the development present situation investigation, find out the real situation, assess the risk, define the main body of responsibility, establish the pipeline environment management mechanism and Pilot study, establish related disposal management technical specification, developing the pipeline planning, new routing optimization and so on.

  11. Finite Element Modeling of Perturbation Fields due to Colonies of Stress Corrosion Cracks(SCCs) in a Gas Transmission Pipeline

    International Nuclear Information System (INIS)

    The detection of axial cracks using conventional MFL pig is a significant challenge in the gas pipeline inspection. In this study, a technique using interaction of circumferentially induced torrents with axial stress corrosion crack is presented. The feasibility of this technique is investigated using finite element modeling. Finite element analysis of such interaction is a difficult problem in terms of both computation time and memory requirements. The challenges arise due to the nonlinearity of material properties, the small sire of tight cracks relative to that of the magnetizer, and also time stepping involved in modeling velocity effects. This paper presents an approach based on perturbation methods. The overall analysis procedure is divided into 4 simple steps that can be performed sequentially. Modeling results show that this technique can effectively detect colonies of SCC as well as single SCC

  12. Treatment of discharge water from hydrostatic testing of natural gas pipelines. Volume 4. Topical report, January 1989-June 1992

    International Nuclear Information System (INIS)

    The report presents results developed from bench- and full-scale treatment testing conducted on discharge water from hydrostatic testing of natural gas pipelines. Bench-scale testing examined sedimentation with and without chemical coagulants for reducing iron and total suspended solids, aeration for removal of volatile organics, and activated carbon adsorption for removal of organic constituents. Treatment results are provided for a full-scale treatment process, which utilized a hay bale structure and adsorbent booms for removing suspended solids and oil from the discharge water. Detailed characterization results are presented for test water collected before and after treatment. Results developed from an economic analysis of other potential treatment/disposal alternatives are also presented. A total of eight approaches that may be applied for managing constituents present in hydrostatic test waters are examined. The report is Volume 4 of a five-volume report series

  13. Airborne detection of natural gas leaks from transmission pipelines by using a laser system operating in visual, near-IR, and mid-IR wavelength bands

    Science.gov (United States)

    Ershov, Oleg V.; Klimov, Alexey G.; Vavilov, Vladimir P.

    2006-04-01

    An airborne gas detection IR system which includes a laser, infrared imager and video-recorder is described. The sensitivity of the system to leaks from ground pipelines by the laser channel is about 100 ppm*m at 100 m (by methane). The IR thermographic channel plays an auxiliary role and the video channel allows better coordinate positioning of detected gas leaks in conjunction with a built-in GPS device.

  14. 天然气管道泄漏监控软件的设计%Design of Leakage Supervising Software for Natural Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    刘四运; 刘薇

    2015-01-01

    快速准确的检测出天然气输气管道的泄漏在保障天然气运输过程中起着非常重要的作用,该文通过对天然气管道泄漏监控软件的设计和讨论,针对监控软件的主要部分-泄漏预警进行了重点介绍,利用Visual C++技术,设计了一个实时监控天然气输气管道泄漏的软件,为保障天然气安全稳定的运输奠定了基础.%Fast and accurate detection of natural gas transmission pipeline gas leakage of gas transportation plays a very important role in the security, the paper discussed and designed the software of natural gas pipeline leakage monitoring, for the main part of the monitoring software-leakage warning are emphatically introduced, using the technology of Visual C++design a real-time monitoring of gas pipeline leak software, to safeguard the security and stability of the natural gas transportation.

  15. 天然气管网动态过程优化模型研究%Dynamic process optimization model for gas pipeline

    Institute of Scientific and Technical Information of China (English)

    庞喆; 韩涛

    2015-01-01

    通过研究寻求高效可行的解模算法,利用PNS模拟现场的各种工况建立天然气动态模型,用模型进行求解分析,验证并优化模型,设计出实用的程序软件进行管网优化.%The dynamic models for gas pipeline are built up by seeking effective and feasible solution modulus algorithm and simulating a variety of field conditions with PNS. The models are verified and optimized to design practical software for pipeline optimization.

  16. Alaska highway pipeline inquiry

    Energy Technology Data Exchange (ETDEWEB)

    Lysyk, K.M.; Bohmer, E.E.; Phelps, W.L.

    1977-01-01

    A public enquiry was held to determine the social and economic impacts associated with the proposed Alaska Highway pipeline. The pipeline was proposed to carry natural gas from Prudhoe Bay to the continental United States. The pipeline would follow the trans-Alaskan pipeline to Fairbanks, and follow the Alaska Highway through southern Yukon into northern British Columbia. The 48 inch pipe would operate at a pressure of 1,260 psi and would carry 2.4 billion cubic feet of gas per day, and could operate at that level for at least 25 years. Issues considered included alternative routes, employment and training, economic impact, social impact, the Yukon Indian land claim, the Dempster Lateral pipeline, planning and regulation, and compensation. The enquiry concluded that the government of Canada should not give approval in principle to the proposed pipeline through the southern Yukon without resolving the issues of an advanced payment towards the settlement of the Yukon Indian land claim, of compensation from the pipeline company, the establishment of a planning and control agency, and the deferral of the commencement of construction of the pipeline. 8 figs.

  17. Energy Equation Derivation of the Oil-Gas Flow in Pipelines Dérivation de l’équation d’énergie de l’écoulement huile-gaz dans des pipelines

    Directory of Open Access Journals (Sweden)

    Duan J.M

    2012-09-01

    Full Text Available In the simulation of oil-gas pipeline multiphase flow, thermodynamic computation is an important process interacting with the hydraulic calculation and it influences the convergence of the program and the accuracy of the results. The form of the energy equation is the key to the thermodynamic computation. Based on the energy equation of oil-gas flow in pipeline, the Explicit Temperature Drop Formula (ETDF is derived for oilgas steady state temperature calculation. This new energy equation has considered many factors, such as Joule-Thomson effect, pressure work, friction work and impact of terrain undulation and heat transfer Oil & Gas Science and Technology – Rev. IFP Energies nouvelles with the surroundings along the line. So it is an overall form of energy equation, which could describe the actual fact of multiphase pipeline accurately. Therefore, some standpoints in literatures on the temperature calculation of oil-gas two-phase flow in pipelines are reviewed. Elimination of temperature iteration loop and integration of the explicit temperature equation, instead of enthalpy energy equation, into the conjugated hydraulic and thermal computation have been found to improve the efficiency of algorithm. The calculation applied to both the component model, also applied to the black-oil model. This model is incorporated into the component model and black-oil model, respectively, and two simulations are carried out with two practical pipeline Yingmai-Yaha and Lufeng multiphase pipeline and the temperature results are compared with the simulation calculated by the OLGA and the measured. It is shown that this model has simulated the temperature distribution very well. Finally, we analyzed the influence of the specific heat capacity of oil and gas on the temperature of the mixture of fluids and the influence of the Joule-Thomson effect on the temperature distribution on the pipeline. It is shown that the Joule-Thomson coefficient is a key factor to

  18. GIS在油气长输管道完整性管理中的应用%Application of GIS in the Oil and Gas Pipeline Integrity Management

    Institute of Scientific and Technical Information of China (English)

    耿作孝; 林渊; 李晓宁

    2011-01-01

    传统油气长输管道完整性管理模式和手段在管道突发事故的应变能力、分析处理效率等方面已难以适应当今管道安全管理与监督的需要.为提高管道完整性管理业务综合分析与信息深层次集成的能力,结合油气长输管道距离长、空间跨度大、途径地理情况复杂、运行中发生的事件带有显著空间特征等特点,开发基于GIS的完整性管理系统,旨在以空间特征作为整合管道各种信息的纽带,充分发挥地理信息系统强大的空间数据处理和分析能力,提高长输管道风险识别、高后果区分析、完整性评价和决策支持的水平,以达到管道始终处于受控状态,持续改善管道安全性、可靠性和公众置信度的目的.%Nowadays, safety and environmental concerns from the public have emphasized the requirement for pipeline owners to demonstrate the safe operation of their facilities. Traditional oil & gas transmission Pipeline Integrity Management mode cannot meet the requirements of pipeline safety supervising in terms of dealing with an emergency, analysis and disposal efficiency. To improve the Pipeline Integrity Management business comprehensive analysis ability and information deep - level integration ability, combine with the characteristics that oil & gas transmission pipeline has a long distance and a big spatial span, by way of complex geographical situation, events happening in running have remarkable spatial feature, develop Pipeline Integrity Management System bases onGIS, aimed at using spatial feature as a link to integrate all pipeline information, make GIS spatial data treatment & analysis ability into full play, raise the level of oil & gas transmission Pipeline ability in risk identify, high consequence area analysis, integrity evaluation and decision supporting,to achieve the goal that pipeline always in controlled state, continuously improve pipeline security, reliability and public confidence

  19. Infrared thermographic pipeline leak detection systems for pipeline rehabilitation programs

    Science.gov (United States)

    Weil, Gary J.

    1998-03-01

    Computerized infrared thermographic pipeline inspection is now a refined and accurate process having been thoroughly proven to be an accurate, cost effective, and efficient technology for pipeline rehabilitation programs, during a 10 year development and testing process. The process has been used to test pipelines in chemical plants, water supply systems, steam lines, natural gas pipelines and sewer systems. Its non- contact, non-destructive ability to inspect large areas, from above ground, with 100% coverage and to locate subsurface leaks as well as the additional capability to locate voids and erosion areas surrounding pipelines, make its testing capabilities unique and highly desirable. This paper details the development of computerized infrared thermographic pipeline testing along with case histories illustrating its implementation problems and successes during various rehabilitation programs involving pipelines carrying water, gas, petroleum, and sewage.

  20. A new integrated planning model for gas compression and transmission through a complex pipeline network; Um novo modelo de planejamento integrado de compressao e escoamento de gas para uma rede complexa

    Energy Technology Data Exchange (ETDEWEB)

    Iamashita, Edson K. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Galaxe, Frederico; Arica, Jose [Universidade Estadual do Norte Fluminense (UENF), Campos dos Goytacases, RJ (Brazil)

    2005-07-01

    The aim of this paper is to show a new approach to solve integrated gas balance planning problems that defines the best compression and transmission strategy for a system with a large number of platforms or compression units that are interlinked with the delivery points through a complex gas pipeline network. For solving the proposed optimization problem is used a genetic meta-heuristic technique, where the fitness function of the algorithm is the Profit function of the gas balance, being considered the incomes and costs besides the pipeline network constraints, representing the compression system and transmission network near to the real operational condition. Newton Raphson's method is used to solve the nonlinear system that represents the calculation of the pressure drop in the gas pipeline network that can contain various cycles. This model could be used for design and optimization of gas pipeline networks, as well as for the gas balance planning of an existent network looking for the profit maximization. (author)

  1. Knowledge Discovery of Gas Pipeline Leak Detection%天然气管道泄漏检测中的知识发现

    Institute of Scientific and Technical Information of China (English)

    王秀芳; 王岩; 岳茂兴

    2012-01-01

    As rapid development of foreign and domestic natural gas pipeline construction, the safe operation of pipeline is particularly important in the current. Based on analyzing the cause of gas pipeline leak and using modal acoustic emission method and negative pressure wave method to detect the pipeline,to get pipeline detection information, through the pretreatment leak signal data, according to data mining algorithm realize natural gas potential information mining. Based on that use decision tree classification, DBSCN cluster analysis, K-nearest neighbor algorithm to realize the knowledge discovery process, looking for internal relations, development trend and potential rules, controlling the natural gas transmission beforehand and intelligent monitoring.%随着国内外天然气管道建设的迅速发展,管道的安全运行在当前尤为重要.通过对天然气管线泄漏原因的分析,采用模态声发射法和负压波法对管线进行检测,目的是获取管道检测信息,通过预处理泄露信号数据,针对数据通过预处理以取消数据差异和冗余,采取挖掘算法实现天然气潜信息挖掘,在此采用了决策树分类、DBSCN聚类分析、K近邻算法完成知识发现,寻找管道传输的内在联系、发展趋势及潜在规则,实现天然气传输的事前控制和智能监测.

  2. Calculation for influenced area of consequences of natural gas pipeline leaks%天然气管道泄漏后果影响区域的计算

    Institute of Scientific and Technical Information of China (English)

    谷志宇; 董绍华; 牛景弘; 史纪

    2013-01-01

    Hazards and potential influence areas of high-pressure natural gas pipeline leaks depend on the mode of leak, gas release, diffusion conditions and ignition methods. Taking the urban gas pipeline in service as an example, impacts of natural gas pipeline leaks are analyzed based on two cases of combustion and diffusion, potential influence areas and those for jet fire and vapor cloud diffusion under the condition of 15 cm-hole leak and pipeline pressures of 3.5 MPa and 4.0 MPa are calculated and represented graphically. The results show that in the case of a 15 cm-hole leak, it is safe more than 200 m from the pipeline at all events. Warning regions could be defined and emergency plans formulated based on this.%高压天然气管道泄漏危害和潜在影响区域取决于泄漏模式、气体释放、扩散条件和点燃方式等.以某城市在役燃气管道为例,针对燃烧和扩散两种情况对天然气管道泄漏的后果影响进行分析,计算15 cm孔洞泄漏、管道压力分别为3.5 MPa和4.0 MPa工况下的潜在影响区域、喷射火影响区域及蒸气云扩散影响区域.结果表明:对于15 cm孔洞泄漏,无论发生何种情况,距离管道200 m以外均安全,可以以此划定警戒区域,制定应急预案.

  3. 油气管道机器人技术研发进展%Research and development progress in oil and gas pipeline robotics

    Institute of Scientific and Technical Information of China (English)

    曹建树; 林立; 李杨; 李魁龙

    2013-01-01

    Pipeline robots integrated with smart mobile carrier and pipeline defect nondestructive testing technology are mainly used for detection, coating spraying, joint welding, foreign material removal and other maintenances of industrial pipelines such as oil and gas pipelines. Mode of motion is core technology of the pipeline robots, including active and passive modes. This paper elaborates technical features and difficulties of the pipeline robots using active motion modes such as bionic type, crawler type, screw driven type, vehicle type and supporting wheel type and those using passive motion mode are elaborated and enumerates products and technologies at home and overseas. Based on the above technology, a comparative analysis is carried out for overall performance of various technologies and key technical problems required to resolve for R&D of pipeline robots are proposed.%管道机器人综合了智能移动载体技术和管道缺陷无损检测技术,主要用于输油气管道的检测、喷涂、接口焊接、异物清理等检修维护作业.运动方式是管道机器人的技术核心,包括主动运动方式和被动运动方式两大类.系统阐述了仿生式、履带式、螺旋驱动式、车型式和支撑轮式等5种主动运动方式管道机器人及被动运动方式管道机器人PIG的技术特点和难点,例举了国内外现有产品和技术.对比分析了各种技术的综合性能,提出了管道机器人研发需要重点解决的技术问题.

  4. Mobile Measurement of Methane and Ethane for the Detection and Attribution of Natural Gas Pipeline Leaks Using Off-Axis Integrated Output Spectroscopy

    Science.gov (United States)

    Leen, J. B.; Spillane, S.; Gardner, A.; Hansen, P. C.; Gupta, M.; Baer, D. S.

    2015-12-01

    Natural gas leaks pose a risk to public safety both because of potential explosions as well as from the greenhouse gas potential of fugitive methane. The rapid and cost effective detection of leaks in natural gas distribution is critical to providing a system that is safe for the public and the environment. Detection of methane from a mobile platform (vehicles, aircraft, etc.) is an accepted method of identifying leaks. A robust approach to differentiating pipeline gas (thermogenic) from other biogenic sources is the detection of ethane along with methane. Ethane is present in nearly all thermogenic gas but not in biogenic sources and its presence can be used to positively identify a gas sample. We present a mobile system for the simultaneous measurement of methane and ethane that is capable of detecting pipeline leaks and differentiating pipeline gas from other biogenic sources such as landfills, swamps, sewers, and enteric fermentation. The mobile system consists of a high precision GPS, sonic anemometer, and methane/ethane analyzer based on off-axis integrated cavity output spectroscopy (OA-ICOS). In order to minimize the system cost and facilitate the wide use of mobile leak detection, the analyzer operates in the near-infrared portion of the spectrum where lasers and optics are significantly less costly than in the mid-infrared. The analyzer is capable of detecting methane with a precision of gas with 6% ethane). Finally, analysis of wind data provides an estimate of leak direction and distance. The system presented provides a robust, cost effective solution to natural gas leak detection and attribution to maximize safety and minimize greenhouse gas impacts of distribution systems.

  5. Application of gamma densitometry and statistical signal analysis to gas phase velocity measurements in pipeline hydrotransport

    Directory of Open Access Journals (Sweden)

    Zych Marcin

    2015-01-01

    Full Text Available The work presents selected methods of signal analysis used in the processing of data obtained from radiometric probes. The used data came from an exemplary study of a two-phase liquid-gas flow at the laboratory installation. In such rigs many possible transport types may be observed, i.e. slug, plug and bubble flow, and each of them gives different signal-to-noise ratio of recorded data. Therefore, available radiometric methods of gas phase velocity measurements give diverse accuracies. Authors consider several improvements of data acquisition and processing which increase possibility of the flow type recognition and higher accuracy of the gas phase velocity estimation.

  6. 76 FR 67160 - Southern Star Central Gas Pipeline, Inc.; Notice of Application

    Science.gov (United States)

    2011-10-31

    ... vertically at Southern Star's existing Alden Gas Storage Field located in Rice County, Kansas. Subsequent to... electronic submission of protests and interventions in lieu of paper using the ``eFiling'' link at...

  7. Air-drying Models for New-built Offshore Gas Pipelines%新建海底天然气管道干空气干燥模型研究

    Institute of Scientific and Technical Information of China (English)

    曹学文; 王立洋; 林宗虎

    2005-01-01

    Drying (conditioning) is an important procedure to prevent hydrate formation during gas pipeline gas-up and to protect pipelines against corrosion. The air-drying method is preferred in offshore gas pipelines pre-commissioning. The air-drying process of gas pipelines commonly includes two steps, air purging and soak test. The mass conservation and the phase equilibrium theory are applied to setting up the mathematical models of air purging, which can be used to simulate dry airflow rate and drying time. Fick diffusion law is applied to setting up the mathematical model of soak test, which can predict the water vapor concentration distribution. The results calculated from the purging model and the soak test model are in good agreement with the experimental data in the DF1-1 offshore production pipeline conditioning. The models are verified to be available for the air-drying project design of offshore gas pipelines. Some proposals for air-drying engineering and operational procedures are put forward by analyzing the air-drying process of DF1-1 gas-exporting pipelines.

  8. 77 FR 19414 - Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline Safety...

    Science.gov (United States)

    2012-03-30

    ... Natural Gas Pipelines The contractor will conduct a study on the ability of transmission pipeline facility... study will evaluate Class 3 and Class 4 areas of natural gas transmission pipelines. The contractor must... valves. This review will be for hazardous liquid and natural gas pipelines and determine how...

  9. Engineering Calculation Method of Electromagnetic Effect on Oil/Gas Pipelines from 1 000 kV AC Transmission Line Having Single-phase Ground Fault

    Institute of Scientific and Technical Information of China (English)

    ZHANG Wenliang; JIANG Jun; GUO Jian; LU Jiayu

    2012-01-01

    There will be more and more AC transmission lines near oil/gas pipelines in the future.So in order to determine the safe distance between them,simple and effective methods are required for engineers to efficiently evaluate the electromagnetic effect on oil/gas pipelines due to faults of AC transmission lines.In this paper,an easily handled fitting formula is obtained based on multiple calculation results,which is the maximum voltage on the pipeline anticorrosive coating produced by 1 000 kV AC transmission line under single phase ground fault.Although the calculation results obtained from the fitting formula differ from those gained by precise calculation with softwares,the verification of the formula shows that it is applicable for engineering calculation.This research could be applied to evaluate the electromagnetic effect of 1 000 kV AC transmission line under single-phase ground fault on nearby pipelines,as well as to determine the safe distance or the maximum parallel length.

  10. Urban natural gas pipeline prewarning system and SCADA technology%城市天然气管道预警系统&SCADA技术

    Institute of Scientific and Technical Information of China (English)

    郭道新

    2012-01-01

    随着我国近年来管道的大力发展,管道周边的第三方施工以及恶意破坏对管道安全带来了极大的危害.尤其是天然气管道,一旦发生第三方施工或者破坏导致的管道泄漏,后果很严重.如何在管道遭受破坏之前发现并制止危害事件是管道业主最为关心的问题!因此管道光纤预警技术的出现对于管道安全具有不可估量的意义.该文重点阐述西宁环城高压工程项目燃气通信光缆安全预警系统解决方案.%With the rapid development of natural gas pipeline in recent years, the third party construction around the pipeline and malicious damage have brought great harm to the pipeline safety. If natural gas leakage caused by third-party construction or malicious damage occurred, the consequence would be horrific. How to detect and stop the destruction before the pipeline is damaged is the deep concern for pipeline constructors. So the occurrence of optical fiber pipe warning technology has immeasurable significance for pipe security. This paper mainly describes the solutions of communication optical cable security warning system for Xining city high pressure gas project.

  11. Conference Proceedings: On the edge of change : opportunities in the gas business. Volume 1 - Get insights into gas supply, markets and storage, and pricing trends from major players; Volume 2 - Hear the insider's point of view on all new pipelines east of Chicago

    International Nuclear Information System (INIS)

    The 26 papers presented at this conference dealt with issues related to new opportunities for the natural gas industry. Principal topics addressed were: (1) the challenge of Canada/U.S. natural gas supply, (2) new competition issues, (3) Ontario's role in North American natural gas markets, (4) futures versus fundamentals and gas market price dynamics, (5) gas transportation in western Canada, (6) the future for offshore pipelines, and (7) pipeline projects from Chicago to markets in eastern Canada. tabs., figs

  12. The Struggle for Caspian Sea Oil-Gas Resources and Export Pipelines%里海油气资源与输出管道之争

    Institute of Scientific and Technical Information of China (English)

    张从容

    2012-01-01

    The article expounds on the abundant oil-gas resources potential possessed by Caspian Sea Region,analyzes the struggle tactics of Europe,USA,Russia and other parties being aimed at Caspian Sea oil-gas resources and emphatically concludes the distribution and setup of Caspian Sea oil-gas export pipelines.%里海地区具有丰富油气资源潜力,分析了欧美俄多方针对里海油气资源的争夺策略,重点归纳了里海油气外输管道的分布与格局。

  13. Security resolution minute for natural gas distribution pipeline; Minuta de resolucao de seguranca na distribuicao do gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Teles, Marcus de Barros [ARCE - Agencia Reguladora de Servicos Publicos Delegados do Estado do Ceara, Fortaleza, CE (Brazil)

    2003-07-01

    In the current scenery of natural gas distribution regulation, there is no specific resolution about security. The security is boarded in few concession contracts of some private gas companies, but not as principal theme. The security resolution minute presented in this paper aim break the direct and indirect causes of accidents, eliminating their potential. In this new point of view, the quality of services is the principal cause to guarantee the security of natural gas distribution systems. The methodology used to develop the minute was based on the research of Brazilian and American resolutions of state regulation agencies, concession contracts of private distribution gas companies, American code of federal regulation, ASME code for pressure piping B31.8 - 1999 edition and the NBR 12712 standard. The result of the research was the elaboration of an specific minute resolution of security that can be used as reference in the fiscalization of the natural gas distribution piping companies activities. This minute, can be an important instrument to avoid accidents and incidents, eliminating prejudices to the people, to properties, to environment and to the image of natural gas distribution companies and regulation agencies. (author)

  14. Cost analysis of teg-powered and solar-powered cathodic protection system for a-50 km long buried natural gas pipeline located in Sindh, Pakistan

    International Nuclear Information System (INIS)

    Corrosion leaks are of significant concern to oil and gas industry and is considered to be the largest controllable factor in pipeline safety. Cathodic Protection (CP) is a well-established method for preventing corrosion of metallic materials. Electrical power is required and it is usually difficult and expensive to install conventional power lines in remote areas for readily available power supply. Oil/gas organizations make use of thermo-electric generators (TEG), which is relatively expensive in terms of running expenditures. Utilization of renewable energies is now being widely explored due to potential danger of running out of natural resources and dates back mid of 20th century [I]. However, use of solar powered CP system for oil/gas pipelines hasn't been encouraged much in Pakistan, probably due to lack of understanding. A project was undertaken for designing a solar powered CP system for a 52.4 km buried gas pipeline located at Sui/Sara gas fields (Latitude 27.5) of Tullow Pakistan (Dev.) Ltd. in Dharki, Sindh, Pakistan. After detailed analysis of soil condition, electrochemical testing, local climatic variation and cost analysis, it has been revealed that use of solar power is quite feasible for the above-mentioned pipeline section. Cost analysis and comparison have also favored this system since the maintenance cost of the solar-powered system is much less compared to TEG system. Installation cost of the solar system is about 1.57 times the cost of TEG; however, the maintenance cost is only -20% of that for TEG system. The higher installation cost has been estimated to be recoverable in less than one year of service. (author)

  15. Environmental assessment on PETROBRAS pipeline projects: case study of Cacimbas-Catu gas pipeline; Engenharia de avaliacao ambiental no processo de concepcao de projetos de dutos da PETROBRAS - estudo de caso do Gasoduto Cacimbas (ES) - Catu (BA)

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Wilson Jose de; Pereira Junior, Edson R.; Fonseca, Renata A. Almeida; Rocha, Marcelo de Andrade; Soares, Luis Felipe [PETROBRAS Engenharia, RJ (Brazil). Engenharia de Avaliacao Ambiental

    2005-07-01

    The environmental assessment process is one of the most important phases in the implementation of pipeline projects. For that reason, new technologies and work procedures are used to perform the environmental assessment of areas where pipeways will be implemented. Since the quality of environmental assessment studies influences the social acceptance of projects and, consequently, the time required to obtain the environmental permits, PETROBRAS (Engenharia/IETEG/ETEG/EAMB) applies advanced technological tools to acquire remote sensing data (conventional / digital aero-surveys and satellite images), as well as software for digital image processing and integration and spatial analysis of information. Information about the physical, biological and socioeconomic environments are further verified and complemented through field trips using helicopters. This process makes it possible to identify environmentally favorable corridors to develop guidelines for the implementation of the pipeline, assuring its environmental feasibility, and produces relevant data to support the Environmental Impact Assessment Study, the Environmental Impact Assessment Report and the Risk Analysis Study. As an example of the application of this methodology, this paper presents results of the assessment of the Cacimbas / Catu gas pipeline, which is currently being permitted and is planned to be implemented in areas of high environmental complexity. (author)

  16. Correlation between designed wall thickness of gas pipelines and external and internal corrosion processes; Adequacao de espessura de parede projetada em funcao de processos de corrosao externa e interna em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, Jose Antonio da Cunha Ponciano [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia (COPPE). Programa de Engenharia Metalurgica

    2004-07-01

    Corrosion control on gas pipelines plays an important role on the assessment of pipeline integrity and reliability. In many countries a great extension of buried pipelines is used on transport and distribution systems. This extension will be certainly increased in a near future due to the increasing consumption of natural gas. Inadequate corrosion control can drive to pipeline failures, bringing up the possibility of accidents in populated or environmental protected areas, bringing together severe economical, legal and environmental consequences. Corrosion is frequently considered as a natural and inevitable phenomenon. Based upon this assumption, some recommendations are included on design standards of gas pipelines in order to compensate its detrimental effect. The aim of this work is to present a review of the correlation between external corrosion process and the guidelines established during the project phase of gas pipelines. It is intended to contribute for a better understanding of the impacts of corrosion on integrity, reliability and readiness of gas transport and distribution systems. Some aspects regarding external corrosion of pipelines extracted from technical papers will be summarised. Information provided will be compared to design criterion prescribed by the NBR 12712 Standard. (author)

  17. Finite element analysis of settlement of buried natural gas pipelines%天然气埋地管道沉降的有限元分析

    Institute of Scientific and Technical Information of China (English)

    李新慧

    2013-01-01

    埋地管道由于铺设在土体中,受力状态较地上管道复杂,尤其是敷设在软土地基上的管道,地基对管道承载能力差,管道将随着时间发生沉降现象.对某铺设在软土地基上的管道沉降进行现场测试及理论研究,运用ANSYS有限元分析软件进行模型建立,分析了不同的土质和内压等条件下管道的初始应力,得到了各影响因素对管道应力和位移的影响规律,可作为防治管线沉降参考.%The settlement of the buried natural gas pipelines is investigated.The load on the pipelines buried in ground,especially in soft and plastic soil ground,is much more complicated than that on the ground.Because of the pool load bearing capacity of the ground,the pipeline will settle with time.The settlement and stress of the buried pipelines are investigated based on the theories and experiments,and the FEM is used to analyze the stress distribution and displacement of the settled pipelines under different conditions such as soil properties and operation pressure.The results may be used as reference to protect the settlement of pipelines.

  18. Power-line-induced ac potential on natural-gas pipelines for complex rights-of-way configurations. Volume 2. Graphical analysis handbook. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, M.

    1983-05-01

    Joint use of common corridors for overhead electric-power-transmission lines and buried natural-gas-transmission pipelines results in undesired coupling of electromagnetic energy onto the natural-gas-transmission pipelines. The project has resulted in the development of the methodology and techniques for analyzing such complex common corridor coupling problems. Field tests were conducted to verify key aspects of the analysis. Two complementary methods have been developed for solving coupling problems on common corridors: a handbook that provides simplified procedures and graphical aids that can be used to analyze many less complex common corridor concerns, and a computer program that provides the means for analyzing a wide range of more complex configurations. This volume presents the simplified graphical analysis.

  19. Transient cavitation in pipelines

    NARCIS (Netherlands)

    Kranenburg, C.

    1974-01-01

    The aim of the present study is to set up a one-dimensional mathematical model, which describes the transient flow in pipelines, taking into account the influence of cavitation and free gas. The flow will be conceived of as a three-phase flow of the liquid, its vapour and non-condensible gas. The wa

  20. LNG versus pipelines: a case study applied to the actual unbalance in Northeastern natural gas market; GNL versus gasodutos: um estudo applicado ao atual desequilibrio do mercado nordestino de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Rechelo Neto, Carlos A. [Sao Paulo Univ., SP (Brazil). Inst. de Eletrotecnica e Energia. Programa Interunidades de Pos-graduacao em Energia; Sauer, Ildo L. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Unidade de Gas e Energia

    2005-07-01

    Against the backdrop of global oil industry trends and the specificity of the Brazilian energy sector, this study evaluates whether the option to develop a national market linked with a plan to export liquefied natural gas produced in Brazil is financially advantageous relative to the traditional pipeline alternative for the aim of satisfying the current natural gas deficit in the Northeast region. To this end, this dissertation analyses the economic conditions for Brazilian LNG in the international gas market, mainly for European and North-American gas markets. Employing a probabilistic analysis based on the Monte Carlo method and given the premises adopted and the amount of information available at the time of writing, the study concludes that, while the international LNG market has enjoyed vigorous growth in recent years, the option of using it as a strategy to develop local market is a less attractive investment choice compared with the pipeline alternative. (author)

  1. Ability for construction of administrative serve from gas pipelines; Competencia para constituicao de servidao administrativa dos dutos de gas

    Energy Technology Data Exchange (ETDEWEB)

    Souza Neto, Gaudencio Jeronimo de; Araujo, Izabella Maria Medeiros e; Mendonca, Fabiano Andre de Souza [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil). Faculdade de Direito

    2004-07-01

    The work in focus longs for to elucidate the relative question to the institution of administrative servitude for the passage of the natural gas ducts. Preliminarily, we will deal with the question of the the citizen's access of fuels, dedicating to the social function of the national system of supplying. We objectify to demonstrate the importance of the industry of the natural gas for the economic development of the country because it's an energy alternative to oil, more vulnerable to the oscillations of the international market. In this context, we stand out the relevance of the activities of transport and distribution as way of access to the natural gas and the necessary legal instrument to the viability of these activities, that it is the administrative servitude, through which the passage of the gas-lines in particular properties is possible. We will define who in the State is competent to declare the public utility of areas to institute the servitude and to forward the resultant of the authorization of the administrative proceeding. The used criterion is the principle of the predominance of the interest, that it is the general principle of the distribution of the abilities in the Federal Constitution. (author)

  2. Critical analyses of public participation as part of the environmental impact assessment process for the installation of gas pipeline / by Werner Petrick

    OpenAIRE

    Petrick, Werner Arthur

    2004-01-01

    The protection of the environment is becoming one of the most pressing concerns of mankind in the 21St century. South African Legislation requires an environmental impact assessment (EM) to obtain authorisation for executing certain activities. Constructing and operating a gas pipeline requires an authorisation from the relevant authorities under the EIA legislation. One of the objectives of an EIA is to ensure public involvement. South African legislation stipulates guid...

  3. Take-over and distribution of natural gas in Vienna - the high and low pressure pipeline systems. Uebernahme und Verteilung des Erdgases in Wien - die Hoch- und Niederdruckleitungssysteme

    Energy Technology Data Exchange (ETDEWEB)

    Gutleber, O. (Wiener Stadtwerke-Gaswerke, Vienna (Austria))

    1989-10-01

    For the distribution of some 830x10{sup 6} m{sup 3} of natural gas (1988) the Vienna gasworks operates a pipeline grid of 3 046 km, of which 485 km belong to the high-pressure grid and about 2 561 km to the low-pressure grid. This article describes the development of the Vienna supply system from 1899 to the present day with a discussion of pipe materials, operating values, corrosion control, etc. (orig.).

  4. Refurbishing of domestic natural gas service pipelines with Live Service Insertion; Sanierung von Erdgas-Hausanschluessen mit Live Service Insertion

    Energy Technology Data Exchange (ETDEWEB)

    Kittl, M.

    1996-03-01

    When using the `live service injection` refurbishing process, the old steel domestic connection is reproduced without any underground work. The refurbishing is done exclusively from the building cellar. A considerable reduction in costs from conventional methods of construction is therefore possible. The main application for `live service injection` is for supply undertakings with extensive refurbishment potential. Main pipelines and domestic connection pipes can be renewed at different times and independently of one another. This makes flexible and quick completion at site possible; the gas customer is only cut off from the supply for about four hours. (orig.) [Deutsch] Bei Einsatz des Sanierungsverfahrens Live Service Insertion wird der alte Stahl-Hausanschluss komplett ohne Tiefbau wiederhergestellt. Die Sanierung wird dabei ausschliesslich vom Gebaeudekeller aus vorgenommen. Eine erhebliche Kostenreduzierung zur konventionellen Bauweise ist damit moeeglich. Der Haupteinsatz fuer Live Service Insertion ergibt sich fuer Versorgungsunternehmen mit umfangreichem Sanierungspotential. Hauptleitungen und Hausanschlussleitungen koennen zeitlich getrennt und unabhaengig voneinander erneuert werden. Dadurch ist eine flexible und zuegige Baustellenabwicklung moeglich; der Gaskunde ist nur fuer etwa vier Stunden von der Versorgung getrennt. (orig.)

  5. Cost-cutting alternatives for the surface restoration when laying natural gas pipelines; Kostensenkende Alternativen der Oberflaechenwiederherstellung im Rohrleitungsbau

    Energy Technology Data Exchange (ETDEWEB)

    Strietzel, W.; Kittl, M.

    1995-05-01

    Increasing cost problems force gas utilities to look for alternative techniques in pipeline laying. Mobile bitumen recyclers and large-surface milling cutters may reduce dumping cost, driving cost and the cost for acquisition of new materials. The cost savings differ regionally, but they will get larger as dumping costs increase. the alternative techniques have additional advantages on the construction site. For example, waiting times are shorter, and cold asphalt need not applied in the winter season. The quality of reconstruction is the same for both techniques. Noise and pollutant emissions of the bitumen recycler and milling cutter are within the normal level of a construction site. In addition, recycling will help save raw materials. (orig.) [Deutsch] Durch zunehmenden Kostendruck auf die Erdgasversorgungsunternehmen werden Alternativen zu konventionellen Techniken in der Rohrleitungsverlegung notwendig. Der Einsatz von mobilen Bitumenrecyclern und Flaechenkaltfraesen kann Deponie-, Fahrt- und Anschaffungskosten fuer Neumaterial reduzieren. Je nach oertlicher Gegebenheit ist das Einsparpotential unterschiedlich gross, wird aber in Zukunft durch steigende Deponiegebuehren zunehmen. Der Einsatz der Alternativverfahren bringt zusaetzliche Vorteile bei der Baustellenabwicklung. So lassen sich z.B. Wartezeiten auf der Baustelle reduzieren, und das Aufbringen von Kaltasphalt waehrend der Winterzeit laesst sich vermeiden. Die Qualitaet der Wiederherstellung ist durch beide Alternativverfahren gegeben. Die Laerm- und Schadstoffemissionen des Bitumenrecyclers und der Fraese bleiben im vertretbaren Rahmen der normalen Baustellenabwicklung. Zudem werden durch Materialrecycling Rohstoffe gespart. (orig.)

  6. Causes of Increased Corrosion in Oil and Gas Pipelines in the Middle East

    OpenAIRE

    Amir Samimi

    2013-01-01

    Transfer tubes of petroleum are extensive network that responsible forpetroleum and gas transference from petroleum field under the sea to platform and to stores in coast related centers. Occasionally, some part of this network damages, because of corrosion and result in stop production and also disorder in transfer and distribution. This matter, in addition to direct cost for corrosion and its resulting events, that is financial damage, lead to irreparable damages toenvironment too. So, it i...

  7. Analysis of CO2 Separation from Flue Gas, Pipeline Transportation, and Sequestration in Coal

    Energy Technology Data Exchange (ETDEWEB)

    Eric P. Robertson

    2007-09-01

    This report was written to satisfy a milestone of the Enhanced Coal Bed Methane Recovery and CO2 Sequestration task of the Big Sky Carbon Sequestration project. The report begins to assess the costs associated with separating the CO2 from flue gas and then injecting it into an unminable coal seam. The technical challenges and costs associated with CO2 separation from flue gas and transportation of the separated CO2 from the point source to an appropriate sequestration target was analyzed. The report includes the selection of a specific coal-fired power plant for the application of CO2 separation technology. An appropriate CO2 separation technology was identified from existing commercial technologies. The report also includes a process design for the chosen technology tailored to the selected power plant that used to obtain accurate costs of separating the CO2 from the flue gas. In addition, an analysis of the costs for compression and transportation of the CO2 from the point-source to an appropriate coal bed sequestration site was included in the report.

  8. Numerical Simulation of Flow in Flowrate Measurement Section of Natural Gas Pipelines

    Institute of Scientific and Technical Information of China (English)

    Li Zhenlin; Zhang Yongxue

    2006-01-01

    The orifice-plate flowmeter and ultrasonic flowmeter are used widely for natural gas flowrate measurement, and the measurement accuracy is affected greatly by flow state. Numerical simulation was used to study the flow of natural gas in the diffusion pipe, and the length of the irregular flow induced by the diffuser or rectifier was computed. Simulation results indicated that the flow in the diffusion pipe was three-dimensional turbulent flow and the steady state flow was restored at 17 pipe-diameters downstream of the diffuser. The rectifiers equipped in the diffusion pipe showed good rectification effect, notwithstanding the induced irregular flow. Downstream the rectifier, the flow became symmetrical and uniform in a shorter length than the case without a rectifier. For the diffusion pipe equipped with plate rectifier, tube rectifier and tube-plate rectifier, the lengths at which uniformly distributed flow was restored were 12, 6 and 5 pipe-diameters downstream the rectifier respectively. On the basis of simulation results, the minimum installation length for flowmeters equipped in the diffusion pipe was determined. This provides a new method for improving natural gas measurement accuracy.

  9. 美国与加拿大油气管道的安全保护%Safety protection of oil and gas pipelines in US and Canada

    Institute of Scientific and Technical Information of China (English)

    卢海军; 赵勇昌; 冯治中; 戴联双; 高丽

    2013-01-01

    基于我国油气管道安全保护的多维防护体系存在的诸多不足和薄弱环节,分析了美国和加拿大在油气管道安全保护方面的法规制度、标准规范及两国石油企业在管道安全保护的相关规定.指出我国标准在规范人防、物防、技防等方面存在较大差距,介绍了美国和加拿大管道安全保护的实例和先进理念,结合国内当前在油气管道安全保卫的通常做法,对改进和加强我国油气管道安全保护工作提出了建议,即从建立监管机构、明确分工职责、建设安全防护技术体系等方面进行完善.%Since the multidimensional protection system of oil and gas pipelines in China has many shortages and weak links,this paper analyzes American and Canadian laws and standards on safety protection of oil and gas pipelines and relevant regulations on safety protections of pipelines in the petroleum enterprises in both countries.The paper points out that China's standards lag way behind in normal manual protection,physical protection,technical protection,etc,introduces examples and advanced ideas of safety protection of pipelines in US and Canada,in view of common practices in safety protection of oil and gas pipelines in China,puts forward suggestions on improving and strengthening safety protection of oil and gas pipelines,which include establishing supervision institution,making responsibility clear-cut and constructing safety protection technical system.

  10. Fundamental study on leak detection of underground gas pipeline using passive acoustic method; Judogata onkyo keisoku ni yoru maisetsu gas dokan hason kasho no kenshutsu ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Jinguji, M.; Imaizumi, H.; Kunimatsu, S.; Isei, T. [National Institute for Resources and Environment, Tsukuba (Japan)

    1997-05-27

    With an objective to detect gas leaking from an underground gas pipeline, discussions have been given on a method which utilizes acoustic characteristics of leakage. On leaking sound generated from damaged portions, the form of damaging was hypothesized as pinholes, and spectra of leaking sounds from holes with different diameters were measured. The dominant frequency decreases as the hole diameter increases, while it is in a region of relatively high frequency of 1 kHz or higher. However, detection from the ground surface was impossible when cover soil has thickness from 0.5 to 1.5 m. In an experiment to measure leaking sound inside the pipe, pressure in the pipe was adjusted to 0.02 atm which is a standard pressure for a low-pressure pipe, and the sound was measured when the hole diameters were varied. In any of the results obtained by varying the hole diameter, spectra having the dominant frequency in the region of 1 kHz or higher were measured. In addition, it was found that sound pressure difference of as much as 50 dB at maximum is generated as compared with a case of no sound leakage. The above results verified that monitoring the high frequency of 1 kHz or higher is effective in detecting leakage from small damages. 2 refs., 4 figs.

  11. Integrated natural gas pipeline control and customer service system of Gasum; Le systeme integre de controle des canalisations de gaz et de service au consommateur chez Gasum

    Energy Technology Data Exchange (ETDEWEB)

    Aho, J.; Manty, O.; Ahlnas, B. [Gasul Oy (Finland)

    2000-07-01

    Due to the rapid development of the information technology, ageing is not the only driving force for replacing old computer systems with more sophisticated ones. The Finnish natural Gas company, Gasum Oy, has recently taken into use a new control and monitoring system for natural gas pipeline. A special customer service system, developed by Gasum Oy, is closely connected to monitoring system. It provides up-to-date information to all customers of Gasum Oy. The information is layered in three confidential levels: general information, operational data and invoicing information. The system is operating interactively in confidential Extranet. Inside Gasum Oy to meet the needs of departments outside the control room, a new GID system is developed. GID is a way to present pipeline process data and its further modifications with a very user-friendly interface based on geographical map. The system is based on data warehouse architecture and it is working on company's Intranet. This makes it possible to present various secrecy level information based on user ID. Gasum's new SCADA is not only the base for operating the pipeline, but it also provides lot of vital information to other systems serving different user groups within natural gas business in Finland. (authors)

  12. Last 20 years of gas hydrates in the oil industry : challenges and achievements in predicting pipeline blockage

    Energy Technology Data Exchange (ETDEWEB)

    Estanga, D.A.; Creek, J.; Subramanian, S.; Kini, R.A. [Chevron Energy Technology Co., Houston, TX (United States)

    2008-07-01

    This paper reviewed how the successes of the past 20 years have shaped the new hydrate focus. It also outlined innovative tools for hydrate plugging prediction. Tools such as CSMHyK-OLGA were developed to address the design and operational challenges associated with offshore production regarding flow assurance in the area of gas hydrates. The effort to understand the complex behavior of gas hydrates in multiphase flow has resulted in new hydrate blockage models. Although the hydrate community continues to debate the impact of kinetics, agglomeration, and oil chemistry effects on hydrate blockage formation in pipelines and wellbores, the petroleum industry still relies on thermodynamic strategies that completely prevent hydrates in production systems. However, these complex strategies such as thermal insulation, electric heating, dead oil displacement, and methanol injection are costly, particularly for marginal fields. As such, research continues in developing a comprehensive multiphase flow simulator capable of handling the transient aspects of production operations, notably shut-in, restart, blowdown and blockage prediction. Model predictions are leading to new operating strategies based on risk management approach. This paper discussed the challenges and opportunities that have shifted the focus from prevention of hydrates to prevention of blockage. Some initial successes in the development of a first generation empirical tool for the prediction of hydrate blockages in flow lines were also presented along with new experimental data that explained how hydrate blockages can manifest in the field. It was concluded that additional research is needed to solve the problem of hydrate plugging mechanism. 12 refs., 6 figs.

  13. Long-term contracts for European gas supply - an empirical analysis of the changing nature of pipeline and LNG-contracts

    International Nuclear Information System (INIS)

    As the structure of the European natural gas market is evolving towards more competition and more diverse market structures than before, the nature of the long-term contracts for European natural gas supply is also undergoing change. Experience from other liberalization processes, such as in the U.S. or the UK, suggests that the importance of long-term contracts diminishes over time, but that they remain an important element of supply. In Europe long-term contracts are still considered as a firm basis for investment and financing of capital-intensive infrastructure with a high degree of asset and relationship-specificity. Literature on institutional economics also suggests that long-term contracts act as a device to overcome the ''hold-up'' problem of relationship-specific investments in infrastructure (Klein, Crawford, and Alchian, 1987; Williamson, 1975, 1985). On the other hand, Hartley and Brito (2002) show that more flexible markets also imply a lower degree of asset specificity, thus requiring less fixed contracts. This paper explores the changing nature of long-term contracts for European natural gas supply, with a particular focus on differences between contracts for pipeline gas and liquefied natural gas (LNG). Traditionally, Europe relied on very long-term contracts for pipeline gas (Russia, Norway, Algeria). More recently, increasing LNG supplies are contemplated as a more flexible source of natural gas: The international LNG market is becoming more flexible, LNG can be sourced from a variety of sellers, and the cost of LNG supplies and infrastructure is coming down rapidly (Jensen, 2004). Thus, the evaluation of investing in LNG infrastructure (and the so bought flexibility and possibility of arbitraging profits) may be higher than committing to fixed/predetermined flows of pipeline gas. We ask whether this is reflected in the observed contracts. The paper is based on standard contract theory (Bolton and Dewatripont, 2005). We apply a microeconomic

  14. 深挖沟铺管技术在渤西南联网供气项目上的应用%Application of the Pipeline-Laying Technology for Deep Trenching on the Gas Pipeline Network System of Boxi & Bonan Oil/Gas Fields

    Institute of Scientific and Technical Information of China (English)

    蒲玉成

    2012-01-01

    There is a great deal of methods in the submarine pipeline-laying, methods adopted are different from each other due to the various situations of seawater depth, geological conditions and so on. In order to avoid the damage by any kind of vessel anchoring at anchorage, and to ensure the safety of submarine pipelines, The project of the Gas Pipeline Network System of Boxi & Bonan Oil/gas Fields is carried out by Offshore Oil Engineering Co., Ltd. (COOEC) and Tianjin Junhao Offshore Engineering Co., Ltd. (JHHG) by the use of the contact type submersible jet flow spray gas lift type trenching machine (it's the patent facility), the submarine pipeline-laying and post-trenching works are first successfully completed with burial depth up to 4m for domestic deep trenching operation pipeline with. It is shown that the initiate procedure could be applied to more deep trenching works of the submarine pipeline in the future through this methodological description of the deep trenching, as well as could be recommended to that the submarine pipeline crossing sea-routes or the anchorage and the similar pipeline constructions which not only be able to protect pipelines but also have to ensure the sea-route unobstructed.%海底管道的铺设有很多种挖沟方法,因海水深度,地质条件等情况的不同,采用的方法也不相同.渤西南联网供气项目为避免锚地的各类船只抛描破坏,保证海管的安全,海洋石油工程股份有限公司和天津俊昊海洋工程有限公司在海底管道铺设和后挖沟施工中进行合作,采用接触武潜水射流喷冲气举式挖沟机(此系专利设备),首次成功完成了国内海管埋深达到4米的深挖沟作业.通过这次深挖沟埋管的实施,证明这种新的工艺,可以应用到更多的海底管道深挖沟埋管工程中,也可以应用到海管穿越航道、锚地等类似的既要保护管道又要保证通航安全的管道施工工程中.

  15. Microbial corrosion and cracking in steel. A concept for evaluation of hydrogen-assisted stress corrosion cracking in cathodically protected high-pressure gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Vendelbo Nielsen, L.

    1998-08-01

    An effort has been undertaken in order to develop a concept for evaluation of the risk of hydrogen-assisted cracking in cathodically protected gas transmission pipelines. The effort was divided into the following subtasks: A. Establish a correlation between the fracture mechanical properties of high-strength pipeline steel and the concentration of hydrogen present in the steel. B. Determine the degree hydrogen absorption by cathodically protected steel exposed in natural soil sediment, which include activity of sulphate-reducing bacteria (SRB). C. Compare the above points with fracture mechanical considerations on the level of stress intensity actually present in pipelines during normal operational conditions. The results were used for a discussion - based on well established fracture mechanical relations - on which set of conditions (CP-level and operating pipeline pressure) could give crack propagation. This resulted in threshold curves that can be used for assessment of the risk of hydrogen-assisted cracking as a function of operating pressure and hydrogen content - having the flaw size as discrete parameter. The results are to be used mainly on a conceptual basis, but it was indicated that the requirements for crack propagation include an overprotective CP-condition, a severe sulphate-reducing environment, as well as a large flaw (8 mm or a leak in the present case). A 1 mm flaw (which may be the maximum realistic flaw size) is believed to be unable to provoke crack propagation in this steel. (EG) EFP-95. 16 refs.

  16. Gas pipeline internal painting: an economical advantage; Uso da pintura interna em gasodutos: uma vantagem economica

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Christian E.; Santos, Paulo T. [Soco-Ril do Brasil S.A., Pindamonhangaba, SP (Brazil)]|[Faculdade de Engenharia Quimica de Lorena (FAENQUIL), SP (Brazil). Programa de Pos-graduacao em Engenharia Mecanica; Oliveira, Luiz C. [Confab Industrial S.A., Pindamonhangaba, SP (Brazil)]|[Faculdade de Engenharia Quimica de Lorena (FAENQUIL), SP (Brazil). Programa de Pos-graduacao em Engenharia Mecanica; Campos, Paulo H. [Confab Industrial S.A., Pindamonhangaba, SP (Brazil)

    2003-07-01

    Focusing the fabulous financial losses due to the corrosion problems, it had been necessary increase the range of new technologies and developments regarding material protection. The application of internal painting systems have become the most employed protection technical, showing a lot of benefits: improved flow characteristics of gas, reduced energy consumption of pumping, reduced pressure drops, easily application, inspection and maintenance, faster commissioning, reduced deposition of condensate and microorganism, excellent preventing corrosion during storage and operation, and others. The present paper describe the advantages and the technical and financial benefits of liquid epoxy internal coating. (author)

  17. Carbon Dioxide Corrosion::Modelling and Experimental Work Applied to Natural Gas Pipelines

    OpenAIRE

    Fosbøl, Philip Loldrup; Stenby, Erling Halfdan; Thomsen, Kaj

    2008-01-01

    Karbondioxid (CO2) korrosion er et udbredt og dyrt problem for industrien. I dette arbejde sættes fokus på et olie og gas relateret produktionsproblem, som findes i offshore naturgasrør. I fremtiden vil dette arbejde have stor betydning for CO2 transport i relation til CO2 capture i den danske energisektor. Problemet med CO2 korrosion i naturgasrør præsenteres. Det vises hvordan vand kondenserer fra den fugtige naturgas og danner en væske i rørene. Fra industriens side pH-stabiliserer man ved...

  18. Numerical Simulation of Oil-Gas Separation in Tee Pipeline%异径T型管道内油气分离过程数值模拟

    Institute of Scientific and Technical Information of China (English)

    姜凤利; 范开峰; 王卫强; 赵鹏; 张源李

    2011-01-01

    When the gas-liquid two-phase flows through tee pipeline, the distribution of two phase in two branch pipes is always uneven. There may be only gas branch in pipelines when it is serious, while the other export tube may be full of liquid. The numerical simulation on oil - gas two phase fluxion in different time by CFD was made and the oil and gas separation characteristics in branch pipes were get. The results show that there will be gas- liquid separation phenomenon in branch pipe when the oil and gas flow through branch pipe of tee pipeline, and close to the mouth branch the separation phenomenon is obvious. There is almost no separation phenomenon in certain distance of the branch mouth.%气液两相流经T型管后,两相介质在各自分支管内相态分布不均,严重时支管内可能只有气体,而主管内为气液混合物.借助CFD软件数值模拟了不同时刻分支处的流动情况,得到了分支管内油气分离特性.结果表明:油气流经T型分支管时,会在支管处出现气液分离现象,离分支口越近,分离现象越明显;当距分支口一定距离时,几乎没有分离现象.

  19. 49 CFR 192.629 - Purging of pipelines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Purging of pipelines. 192.629 Section 192.629... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.629 Purging of pipelines. (a) When a pipeline is being purged of air by use of gas, the gas must be released into one end of the line in...

  20. 天然气管道完整性检测数据收集与整合%Collection and Integration of Natural Gas Pipeline Integrity Testing Data

    Institute of Scientific and Technical Information of China (English)

    吕高峰; 王晓霖

    2013-01-01

    Testing data accuracy and completeness in the natural gas pipeline integrity management are very important. Aiming at the problems of big data volume, frequent update, data loss during collection and integration of data, combined with the actual operating conditions, a closed loop mode method was used to establish a detailed data structure plan for detecting data update to achieve collection and integration management of the pipeline integrity data. The integrated approach has been applied into a natural gas pipeline integrity management system, and can meet the requirements of natural gas pipeline inspection data management.%  检测数据的准确性、完整性在天然气管道完整性管理中十分重要。针对收集、整合检测数据的环节中数据量大、更新频繁、数据丢失等问题,结合实际运行状况,提出运用循环闭合模式方法对检测数据更新建立详细的数据结构表方案,实现了管道完整性数据收集整合管理。该数据循环整合方式已经应用于某天然气管道完整性管理系统检测数据管理,而且能够满足天然气管道检测数据管理要求。

  1. Transport diphasique de gaz et de condensat. Aspects techniques et économiques Technical and Economic Aspects of Two-Phase Pipelining of Gas and Condensate

    Directory of Open Access Journals (Sweden)

    Bourgeois T.

    2006-11-01

    Full Text Available L'évacuation diphasique de la production d'un gisement de gaz à condensat présente des avantages importants, en particulier sur le plan économique. Les caractéristiques des écoulements diphasiques sont exposées, avec les conséquences principales sur la définition d'un schéma d'exploitation. Une comparaison économique est ensuite présentée, pour illustrer la réduction des investissements qui peut être apportée par l'évacuation diphasique de la production. Enfin, les recherches françaises sur les écoulements diphasiques dans les conduites pétrolières sont brièvement décrites, ainsi qu'un exemple de calcul sur une conduite de gaz à condensat en exploitation diphasique. The two-phase pipelining of a wet gas field production presents many advantages, especially from an economic point of view. The characteristics of two-phase flow are described, together with their main consequences on the operational scheme. Then an economic comparison is made to illustrate the reduction in investment costs that can by achieved with two-phase pipelining. Research in France on two-phase flow in gas and condensate pipelines is briefly described, and an example is given of the designing of a wet-gas pipeline currently being operated in the two-phase mode.

  2. Source strength and dispersion of CO2 releases from high-pressure pipelines: CFD model using real gas equation of state

    International Nuclear Information System (INIS)

    Highlights: • Validated CFD models for decompression and dispersion of CO2 releases from pipelines. • Incorporation of real gas EOS into CFD code for source strength estimation. • Demonstration of better performance of SST k–ω turbulence model for jet flow. • Demonstration of better performance of real gas EOS compared to ideal gas EOS. • Demonstration of superiority of CFD models over a commercial risk assessment package. - Abstract: Transportation of CO2 in high-pressure pipelines forms a crucial link in the ever-increasing application of Carbon Capture and Storage (CCS) technologies. An unplanned release of CO2 from a pipeline presents a risk to human and animal populations and the environment. Therefore it is very important to develop a deeper understanding of the atmospheric dispersion of CO2 before the deployment of CO2 pipelines, to allow the appropriate safety precautions to be taken. This paper presents a two-stage Computational Fluid Dynamics (CFD) study developed (1) to estimate the source strength, and (2) to simulate the subsequent dispersion of CO2 in the atmosphere, using the source strength estimated in stage (1). The Peng–Robinson (PR) EOS was incorporated into the CFD code. This enabled accurate modelling of the CO2 jet to achieve more precise source strength estimates. The two-stage simulation approach also resulted in a reduction in the overall computing time. The CFD models were validated against experimental results from the British Petroleum (BP) CO2 dispersion trials, and also against results produced by the risk management package Phast. Compared with the measurements, the CFD simulation results showed good agreement in both source strength and dispersion profile predictions. Furthermore, the effect of release direction on the dispersion was studied. The presented research provides a viable method for the assessment of risks associated with CCS

  3. Causes of Increased Corrosion in Oil and Gas Pipelines in the Middle East

    Directory of Open Access Journals (Sweden)

    Amir Samimi

    2013-01-01

    Full Text Available Transfer tubes of petroleum are extensive network that responsible forpetroleum and gas transference from petroleum field under the sea to platform and to stores in coast related centers. Occasionally, some part of this network damages, because of corrosion and result in stop production and also disorder in transfer and distribution. This matter, in addition to direct cost for corrosion and its resulting events, that is financial damage, lead to irreparable damages toenvironment too. So, it is important to know the factors of making corrosion and leakage in tubes. In this article, we analyzed the reason of corrosion and leakage of tube that use for transfer petroleum fro, a field to platform in bed in the Persian Gulf area. Then we offer some recommendations and solutions for decrease andprevent from further events in this connection.

  4. 77 FR 34458 - Pipeline Safety: Requests for Special Permit

    Science.gov (United States)

    2012-06-11

    ..., Alaska. The pipeline is intended to transport natural gas from the oil and gas producers on the Alaskan... received from Norgasco, Inc., and BreitBurn Energy Company LP, two natural gas pipeline operators, seeking... permits from two natural gas pipeline operators, Norgasco, Inc., (``NI''), and BreitBurn Energy Company...

  5. Gas-liquid two-phase severe slugging in a pipeline-riser system with S-shaped flexible riser: Experiments and modeling

    Science.gov (United States)

    Li, Nailiang; Guo, Liejin; Li, Wensheng

    2013-07-01

    The objective of the present work is to investigate the air-water two-phase flow patterns in pipeline-riser system with an S-shaped flexible riser. The test loop with 50 mm ID consists of a horizontal pipeline with 114 m in length, a downward inclined section with 16 m in length, and an S-shaped flexible riser with 24 m in height when downward section inclined at -2° with respective to the horizontal. The inclination angle of the downward section varied from -2° to -5°. The liquid superficial velocity ranged from 0.03 to 1.5 m/s, and the gas superficial velocity from 0.4 to 6.0 m/s. Identification and characterization of flow regimes were attained by pressure at riser-base and liquid holdup at riser top. Severe slugging I, severe slugging II, transition flow and stable flows are observed to exist. Flow pattern maps for each declination are presented and the transition criteria are proposed. It's found that as higher liquid and gas velocity is required for the transition of the flow in the pipeline from stratified to intermittent with increasing the declination angle, severe slugging was observed to occur over a wilder range of flow conditions. The effect of riser geometry and separator pressure on the occurrence of the flow patterns was also examined. It shows that the S-bend tends to suppress the initiation of severe slugging.

  6. 天然气管道腐蚀穿孔失效分析%Corrosion Perforation Failure Analysis of a Natural Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    张云聪; 徐萌; 刘欣; 郭磊; 郭勇; 王亮; 汪海波

    2013-01-01

      要:采用宏观形貌分析、化学成分分析、显微组织分析、XRD物相分析和土壤环境分析等方法查找某居民小区中的埋地天然气管道穿孔泄漏的原因。结果表明:该管道外防腐层性能较差,在使用过程中发生破损,管壁在强腐蚀性土壤中发生腐蚀穿孔是导致管道泄漏的主要原因,并据此提出了建议和对策。%The fracture reason of a natural gas pipeline occurred perforation leak in a residential area was investigated by macro-morphology analysis, chemical composition analysis, microstructure analysis, XRD phase analysis and soil environmental analysis. The results show that due to the poor performance of the pipeline coating, it’s very easy to be damaged. When the pipeline was buried in highly corrosive soil, the corrosion perforation in the pipe wall became the main reason for the gas leak. According this, it provides the countermeasure and suggestion.

  7. A Novel Method to Enhance Pipeline Trajectory Determination Using Pipeline Junctions

    OpenAIRE

    Hussein Sahli; Naser El-Sheimy

    2016-01-01

    Pipeline inspection gauges (pigs) have been used for many years to perform various maintenance operations in oil and gas pipelines. Different pipeline parameters can be inspected during the pig journey. Although pigs use many sensors to detect the required pipeline parameters, matching these data with the corresponding pipeline location is considered a very important parameter. High-end, tactical-grade inertial measurement units (IMUs) are used in pigging applications to locate the detected p...

  8. 输气管道泄露检测技术进展%Research Progress in Leaking Detection Technology for Gas Transmission Pipelines

    Institute of Scientific and Technical Information of China (English)

    宫克; 冷俊; 潘一; 曹成龙; 王彦博; 康超男; 段元蒙

    2014-01-01

    Gas pipeline leak detection technology is a detection technology of discovering and making detection alarm reaction when the pipeline is becoming aging, corrosion, man-made destruction and its defects. The leakage from gas pipelines will not only bring huge economic loss, but also the leakage of natural gas is serious and hidden security danger. If the leakage cannot be found in time, it is easy to cause a major accident. Therefore, pipeline leak detection technology is a guarantee of the security of oil and gas transportation. In this paper, the leak detection technologies were classified, and principle analysis and adaptability evaluation of nine types of indirect detection techniques were carried out, including the infrared imaging detection technology, the negative pressure wave detection technology, the magnetic flux leakage detection technology, the distributed optical fiber leak detection technology and so on. Finally, the development prospect of the pipeline leak detection technology was discussed.%输气管道泄露检测技术是在管道出现老化、腐蚀、人为破坏和自身缺陷等问题时,及时发现并做出报警反应的检测技术。输气管道泄漏不仅会带来巨大的经济损失,而且外漏后的天然气也存在严重的安全隐患,如不及时发现,容易造成重大事故。因此管道检漏技术就是油气安全运输的保障。首先对检漏技术进行了分类,并着重对红外线成像检漏技术、负压波检测技术、漏磁检漏技术、分布式光纤检漏技术等9种新型的间接检漏技术进行了原理分析、进展介绍和适应性评价,最后对管道检漏技术的发展前景做出了展望。

  9. 输气管道泄漏音波传声特性及泄漏识别%Acoustic Transmission Property of Gas Pipeline Leakage

    Institute of Scientific and Technical Information of China (English)

    忻盛婷; 梁伟; 张来斌

    2013-01-01

    The basic principle of sound wave leakage detection and positioning was introduced in the paper.The acoustic transmission property of pipeline leakage sound wave was studied.The leakage detection platform of gas pipeline was applied to conduct the leakage detection test with different leaking hole diameters under different gas transmission pressures.The acoustic spectrum feature in different conditions was analyzedAccording to different characteristic quantities of signals,the hidden Markov model (HMM) was established in different conditions.The classification identification of pipeline leakage was conducted.The test analysis shows that the method has a desirable identification,proving that it is feasible to apply the HMM to the identification of gas pipeline leakage.Moreover,it has higher identification accuracy than support vector machine (SVM).The method provides the theoretical basis for further study of natural gas pipeline leakage.%介绍了音波泄漏检测与定位的基本原理,研究了管道泄漏音波的传声特性,利用输气管道泄漏检测平台进行了不同输气压力下不同泄漏孔径的泄漏检测试验,分析了不同条件下的声谱特征.根据管道泄漏音波不同信号特征量建立不同条件下的隐马尔可夫模型,对管道泄漏进行了分类识别.试验分析结果表明,该方法有较好的识别率,隐马尔可夫模型应用于输气管道泄漏识别是可行的,且比支持向量机具有更高的识别准确率.该方法为天然气管道泄漏的进一步研究提供了理论基础.

  10. Analysis and Discussion on Pipeline Layout in Gas Turbine Power Plant%燃机电厂管线综合布置分析与探讨

    Institute of Scientific and Technical Information of China (English)

    张水源

    2015-01-01

    To reasonably cope with the relationship between the layout of pipe rack channel and land-saving, the pa-per briefly introduces the pipeline characteristics of gas turbine power plant and analyzes the layout of pipelines in key areas based on a living example.%从工程实例出发,文章简单介绍了燃机电厂的管线特点,对厂区管线重点区域的具体布置方法进行了分析,以探讨在管廊通道与节约用地之间作出合理的选择。

  11. 输气管道压气站余热的利用%Waste heat utilization from compressor station of gas pipeline

    Institute of Scientific and Technical Information of China (English)

    徐铁军; 张伟伟; 吴中林

    2012-01-01

    Waste heat utilization from compressor stations of gas pipeline is an important means to improve pipeline operating level and energy saving and efficiency increase. In fuel-driven compressor station, the waste heat utilization can be achieved based on heat, electricity and machinery. This paper analyzes the utilization plans of waste heat in compressor station which are relatively mature or have great application potential, such as waste heat recovery boilers of gas turbine, gas turbine regenerative cycle, steam Rankine cycle, organic Rankine cycle, gas turbine inlet air cooling. Each plan has many application cases, but also has its limitations. Organic Rankine cycle is more mature and uses organic media, with better application prospects. Lithium bromide absorption refrigeration technology can use waste heat from gas turbine for refrigeration to improve the gas efficiency, and now is only applied in gas turbine power plants, but it can also be used in gas compressor stations. It is pointed out that when selecting waste heat recovery plans, a comprehensive assessment combined with existing conditions of gas compressor stations, unit performance, and operating mode and other factors should be carried out, this has certain significance for next stage reconstruction and construction of pipeline using waste heat in gas compression station.%燃驱压气站的余热利用有热、电和机械3种途径.分析比较了压气站中应用相对成熟或应用潜力较大的余热利用有方案:燃气轮机余热锅炉回收、燃气轮机回热循环、蒸汽郎肯循环、有机郎肯循环、燃气轮机进气制冷.各个方案均有较多应用业绩,但亦有其局限性,有机郎肯循环选用有机介质,技术较成熟,应用前景前较好,溴化锂吸收式制冷技术利用燃机废热对燃机进行进气制冷,以提高燃气效率,目前仅在燃机电站应用,亦可应用于压气站.选择余热利用方案时,应结合压气站现有条件、机组性

  12. Impacts of fuel oil substitution by natural gas in a pipeline network scheduling; Impactos da substituicao do oleo combustivel por gas natural na programacao de uma rede de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Souza Filho, Erito M.; Bahiense, Laura; Ferreira Filho, Virgilio J.M. [Coordenacao dos Programas de Pos-Graduacao de Engenharia (COPPE/UFRJ), RJ (Brazil)

    2012-07-01

    In recent decades, due to the advancement and computational methods for solving optimization problems, the number of articles addressing the scheduling of products has grown. The mathematical models developed have proved useful to schedule from a single pipeline with multiple products to complex networks of multiple pipelines. Moreover, the planning of these activities is of even greater importance when considering the existence of new environmental requirements to be applied to production and marketing of petroleum products. An example of this paradigm shift is the reduction in fuel oil consumption due to increased share of natural gas in the Brazilian energy matrix. In this context, this paper proposes a mathematical model to obtain feasible solutions for problems of scheduling a network of pipelines considering replacing all or part of the demand for fuel oil to natural gas. We tested the model on three real instances of a multi commodity network consists of 4 terminals, 4 refineries and 8 unidirectional pipelines, considering a planning horizon of one week. (author)

  13. Energy saving measures of Shaanxi-Beijing Natural Gas Pipeline System%陕京天然气管网系统的节能措施

    Institute of Scientific and Technical Information of China (English)

    宋明智; 程凤亭

    2012-01-01

    To reduce energy consumption of gas in logistics, Shannxi-Beijing Natural Gas Pipeline System is taken as a case to analyze the natural gas storage and transportation systems. In accordance with operating characteristics and energy consumption conditions of natural gas pipelines, compressor stations, distribution stations and gas storages as well as electric power and natural gas energy consumption in the production, by the use of thermal equilibrium of energy flow, energy cascade utilization, thermodynamic exergy value and other analysis methods, energy-saving measures are researched from different aspects. It is indicated that waste heat utilization, differential pressure power generation and gas storage transformation can be used for energy saving, and the feasibility of various energy-saving measures is analyzed. Exhaust temperature of gas compressor units in the natural gas pipeline network is higher, so the waste heat has a larger potential and value for recycling. Differential pressure, enthalpy and internal energy are calculated on the basis of differential pressure energy of pipeline network distribution stations and converted by the exergy analysis principle to indicate a higher energy use value. In accordance with relevant geological conditions, it is indicated that gas-fired unit exhaust, inert gas or CO2 can replace the natural gas as the bedding gas of the gas storage. This measure can reduce more than 50% of production energy consumption. The research results can provide a reference to the natural gas logistics enterprises to improve production processes and reduce energy consumption.%为降低天然气物流能耗,以陕京天然气管网系统为例,针对天然气储运体系展开分析,根据天然气运输管道、压气站、分输站和储气库运行特征和能耗情况,运用能源流动热平衡、能量梯阶利用和热力学值等分析方法,结合生产中电力和天然气能耗情况,进行不同角度的节能措施研究.指出

  14. Preventive, reducing and compensation actions for environmental impacts of Coari-Manaus gas pipeline; Medidas preventivas, mitigadoras e compensatorias de impactos socioambientais do Projeto Gasoduto Coari-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Mannarino, Ronaldo P. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Rangel, Antonio Carlos F. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Coordenacao de Projetos Especiais da Area de Gas e Energia

    2004-07-01

    The estimated reserve of natural gas of 124,5 billions m3 existent in the Solimoes basin it's the big thermometrical market existent on the Manaus city, actually supplied with liquid fuels, they had become economically viable the construction of a gas pipeline establishing connection it offers of the demand. However, given the complexity of the Amazonian landscape, the ambient aspects need to be studied with use of tools and methodologies integrators, also contemplating the social aspects. A multi discipline group of researches, led for Centro de Ciencias Ambientais from Universidade Federal do Amazonas - CCA/UFAM they had carried through diagnosis of the influences area of Coari-Manaus gas pipeline had as base research developed for PIATAM (Potenciais Impactos e Riscos Ambientais do Transporte de Petroleo e Gas no Amazonas) project during 24 months in the region enclosed for the tracing considered. During the study of UFAM and in the Official Audiences of the licence process had done consultation for the involved communities, and the results served of base for proposal to the prevention of negative impacts, reduce and compensation of inevitable impacts. The legal and institutional requisites are argued and are considered a way to consolidate the existing regulation on the subject having as basic premise the compatibility of the local and regional interests with the necessity of economic development of the country. (author)

  15. The Corrosion Protection of Buried Pipelines in the Gas Compressor Station%输气站场埋地管道的腐蚀与防护

    Institute of Scientific and Technical Information of China (English)

    郭莉; 程晓峰; 巩忠旺; 高扬; 刘严强

    2012-01-01

      The compressor station of natural gas transmission pipeline plays a vital role for the gas transmission systems. Soil corrosion is a main factor, which cause the leak accident of natural gas of the compressor station. In order to control the corrosion of buried pipelines in the gas compressor station effectively, the right anticorrosion coatings and cathodic protection system must be chosen.%  输气管道站场在天然气管网中有着极为重要的位置,腐蚀是造成站场泄漏事故的主要因素之一;因此,在天然气管道站场应用适宜有效的腐蚀防护技术对确保天然气管道系统的安全运行有着极为重要的意义。根据天然气站场的特点,针对性选择适宜的涂层材料和阴极保护方式是确保天然气站场免于腐蚀威胁的最有效手段。

  16. Discussion on Gas Pipeline Leakage Detection and Location Methods%燃气管道泄漏检测与定位方法探讨

    Institute of Scientific and Technical Information of China (English)

    徐亚辉; 段誉

    2012-01-01

    Pipeline is the main method of natural gas transportation. However, gas pipeline leak occurrs frequently due to corrosion, third-party damage and so on, not only affecting the normal transmission of gas, but can also causing environmental pollution, fire, explosion and posing a great threat to people's lives and property safety. So gas pipeline leak detection and location technology has great practical significance and broad application prospects. The current domestic and international methods of leak detection and location are introduced in this paper. And the advantages and disadvantages of various detection methods are pointed out and their application conditions are analyzed.%管道运输是天然气的主要输送方式,然而由于腐蚀、第三方破坏等原因导致的燃气管道泄漏事故时有发生,不仅造成自然资源的浪费、环境的污染,而且也影响正常的生产和生活,危害人类的身心健康,造成人类生命财产的巨大损失。因此,如何根据燃气管道运行信号,及时发现燃气管道泄漏并准确判断管道泄漏位置就具有重大的现实意义和广阔的应用前景。本文主要介绍了目前国内外燃气管道泄漏检测与定位方法的性能指标,指出了各种检测方法的优缺点及适用条件。

  17. Research on influence factors of hydrate formation in natural gas pipeline%天然气管线水合物生成影响因素研究

    Institute of Scientific and Technical Information of China (English)

    王海秀; 周锡堂

    2013-01-01

    介绍了天然气管线中水合物生成条件、以及水合物的生成对管线正常输送和安全运行的影响;提出了天然气管线水合物生成影响因素比较框图,对不同输送工况下管道中水合物的生成进行了分析,得出天然气管线中水合物生成影响因素有输量、起点压力、起点温度和管径,其中输量影响最大,起点压力影响最小,适当增大输量、提高起点温度、降低起点压力和减小管径,可以缩小水合物生成范围甚至避免水合物生成。%The formation of gas hydrate in natural gas pipeline could cause a serious impact on the normal and safe transportation of natural gas. The formation conditions of hydrate in the pipeline were introduced, and a block diagram for comparison of the influence factors of hydrate formation in the pipeline was proposed. Through analyzing the hydrate formation under the different transportation conditions in a concrete example, it was found that the factors affecting the formation of the hydrate contained transportation amount, initial pressure, initial temperature and pipe diameter, among them the most significant was the transportation amount and the lowest in importance was the initial pressure. The formation of gas hydrate could be reduced even avoided by properly increasing transportation amount, raising initial temperature and decreasing initial pressure and pipe diameter.

  18. 西气东输站场放空天然气回收需求与工艺%Recovery and process of stations vent gas In West-to-East Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    王洪喜; 孙盛; 吴中林; 关中原

    2012-01-01

    Gas venting in compressor station and offtake station in the long-distance gas pipeline mainly includes emergency venting and planned venting. The former has randomness with big volume gas venting in a turn, usually free of technical condition to recover, and the latter mainly refers to separator blow-off venting and periodic maintenance venting of compressors, with confirmed plans or periodicity and recovery economy. Statistics shows that the gas venting from compressor maintenance and separator blow-off accounts for more than 50% of the total venting volume in stations of West-to-East Gas Pipeline. Therefore, it is feasible and necessary to recover vented natural gas. To this end, a station vent natural gas recovery processing system with the core of CNG compressors is designed, which can recover the vented natural gas produced from equipment maintenance and blow-off in the station and re-inject it into the upstream pipeline, downstream pipeline or offtake pipeline to achieve the goal of energy saving and emission reduction.%天然气长输管道增压站和分输站放空主要包括紧急抢修放空和计划性放空,前者具有随机性,单次放空量大,不具备回收的技术条件,后者主要指分离器排污放空和压缩机定期检修放空,具有较强的计划性和一定的规律性,具有良好的回收基础条件和回收价值.西气东输管道站场压缩机检修和分离器排污两项放空量之和占总放空量的50%以上,对放空天然气进行回收是可行和必要的.为此,设计了一套以CNG压缩机为核心的站场放空天然气回收工艺系统,可对站场因设备维修、排污等产生的放空天然气进行回收并重新注入上游管道、下游管道或分输管道,达到节能减排的目的.

  19. Theoretical study and design of a low-grade heat-driven pilot ejector refrigeration machine operating with butane and isobutane and intended for cooling of gas transported in a gas-main pipeline

    KAUST Repository

    Petrenko, V.O.

    2011-11-01

    This paper describes the construction and performance of a novel combined system intended for natural gas transportation and power production, and for cooling of gas transported in a gas-main pipeline. The proposed system includes a gas turbine compressor, a combined electrogenerating plant and an ejector refrigeration unit operating with a hydrocarbon refrigerant. The combined electrogenerating plant consists of a high-temperature steam-power cycle and a low-temperature hydrocarbon vapor power cycle, which together comprise a binary vapor system. The combined system is designed for the highest possible effectiveness of power generation and could find wide application in gas-transmission systems of gas-main pipelines. Application of the proposed system would enable year-round power generation and provide cooling of natural gas during periods of high ambient temperature operation. This paper presents the main results of a theoretical study and design performance specifications of a low-grade heat-driven pilot ejector refrigeration machine operating with butane and isobutane. © 2010 Elsevier Ltd and IIR. All rights reserved.

  20. Numerical Simulation of Natural Gas Pipeline Leakage and Diffusion%埋地天然气管道泄漏扩散数值模拟

    Institute of Scientific and Technical Information of China (English)

    王健

    2015-01-01

    针对埋地天然气管道穿孔泄漏扩散问题,结合有限容积法,利用 Gambit2.4建立了天然气管道不同泄漏口径和不同环境温度的 CFD 仿真模型,利用 Fluent6.3分别对不同泄漏口直径(6.35、25.4、101.6 mm)和不同环境温度(0、10、30℃)泄漏工况下,气体在土壤中和空气中扩散规律进行了数值模拟。研究结果表明,随着泄漏口直径增加天然气危害范围逐渐增大,关闭泄漏管段两端阀门以后,气体扩散危害范围逐渐变小;随着环境温度的升高气体危害范围在竖直方向上有明显增加,在地面处危险区域也增加。研究结果为城市埋地天然气管道泄漏事故现场人员疏散及安全抢修提供了理论依据。%To study the diffusion of gas after piercing leakage of buried gas pipeline, combined with the finite volume method, CFD simulation model of the gas pipeline leakage under different leak caliber and different environmental temperature was established based on Gambit 2.4. By using Fluent6.3,gas diffusion rules in soil and air were respectively simulated under different leak caliber (6.35, 25.4, 101.6 mm) and different environmental temperature (0, 10, 30 ℃). The research results show that, with increasing of the leakage hole diameter, gas hazard scope gradually increases. After shutting off the valves at both ends of the leak pipeline, the gas diffusion hazard area gradually decreases. With the increase of environmental temperature, the gas hazard scope in the vertical direction significantly increases, the gas hazard scope on the ground also increases at the same time.

  1. 75 FR 2926 - Pipeline Safety: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator...

    Science.gov (United States)

    2010-01-19

    ... notice advises operators of gas, hazardous liquid, and carbon dioxide pipelines and liquefied natural gas...: Operators of Gas, Hazardous Liquid, and Carbon Dioxide Pipelines and Liquefied Natural Gas Facilities... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Reporting Drug and Alcohol...

  2. Discussion of natural gas pipeline pressure control system configuration%天然气长输管道压力调节系统配置探讨

    Institute of Scientific and Technical Information of China (English)

    李绪勇

    2014-01-01

    The principles and objectives of long distance gas pipeline pressure control system are described. Configuration of different pressure control system, composition of system and features of different conifguration are described. Selection of regulating valve used in pressure control system and integration of pressure control system and station control system are discussed. The Function of pressure control system, such as pressure regulation, lfow control, switching between main pipeline and backup pipeline, emergency control and so on, are discoursed.%简要介绍了天然气长输管道中压力调节系统的设计原则及目标,详细描述了国内压力调节系统主要的配置方式、系统构成及各配置方式的特点,探讨了调节阀的选型及压力调节系统与站控系统的集成,阐述了压力调节系统调压、限流、主备用管路切换及安全控制等功能的实现。

  3. Advanced functions using VBA for the Yacuiba Rio Grande (GASYRG) gas pipeline; Funcoes avancadas usando VBA no gasoduto Yacuiba Rio Grande

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The Yacuiba - Rio Grande Gas Pipeline is remote operated from the Supervision and Control Center (CSC) located in the offices of Transierra S.A. in Santa Cruz de la Sierra, Bolivia. This operation is made by means of a SCADA system based on satellite communication, it starts off at Yacuiba and finishes in Rio Grande, where it deliveries the export gas to Brazil. An Advanced Functions application was developed at the Transierra's CSC, This application runs under Intellution's iFix (HMI of the SCADA) in a Windows platform. It gathers transportation data in real time and by means of a mathematical process and a steady state simulation it makes the following on line calculations: Line Pack, Leak Detection, Transport Efficiency, Pressure Estimate in intermediate points and gas real velocity in the pipeline. The application was developed using Visual BASIC for Applications (VBA) (included in Intellution's iFix) and by means of an interphase to a historical server (iHistorian, Intellution) it is possible to store the obtained results, this integration also allows for the creation of graphs and trends with a great flexibility and to activate alarm points. With a practically null investment, this application replaces high cost specialized packages that are accessories to simulation or SCADA applications. (author)

  4. 压缩天然气管道输送应用分析%Application Analysis of Compressed Natural Gas Pipeline Transportation

    Institute of Scientific and Technical Information of China (English)

    赵辉; 金星; 胡晓露

    2015-01-01

    With the increasing of world energy demand, petroleum resources supply become nervous, in this situa⁃tion, we strengthen the developing of natural gas in our country. With the application of natural gas pipeline auto⁃mation technology, it meets the market demand, at the same time, also provides clean energy for people. This arti⁃cle mainly analyzed the transportation application of natural gas pipeline automation technology and provided cer⁃tain reference for related study.%随着世界能源需求量的增加,造成石油资源供应的短缺,在这种形势下,我国加大了天然气的开发力度。随着天然气管道自动化技术的应用,在满足市场需求的同时,也为人们提供了清洁能源。本文对压缩天然气输送应用进行了分析,为相关研究提供一定参考。

  5. Development of ultrasonic gas flowmeter for large diameter pipeline%大管径超声波煤气流量计的研制

    Institute of Scientific and Technical Information of China (English)

    王寅观; 孙庆德; 蒋勇; 杨海涛; 钟斐晖; 刘蔚; 杨光

    2000-01-01

    由同济大学声学研究所研制的大管径超声波煤气流量计,采用非介入式的超声波探头,直接进行煤气流量的连续在线检测,经过温度和压力的自动补偿后,其测量精度优于2%。超声波煤气流量计的最大测量管径为3 000 mm。%An ultrasonic gas flowmeter for large diameter pipeline has been developed by Institute of Acoustics of Tongji University. It uses non-intruded ultrasonic probes for online measurement of gas flow quantity.Its accuracy is better than 2% after the automatic correction of temperature and pressure. The largest measure ment diameter of pipeline of the ultrasonic gas flowmeter is 3 000 mm.

  6. Design of detection system for household natural gas pipeline leak%家庭天然气管道泄露监测系统的设计

    Institute of Scientific and Technical Information of China (English)

    陈菁; 刘然

    2015-01-01

    这里设计了一种结构简单且具有较强实用意义的家庭天然气管道泄漏检测系统。该系统基于AT82S52单片机收集信号,并针对天然气的特征进行各类气敏传感器的对比选择。使用MQ⁃2型半导体气敏传感器,用C语言进行程序编程,最终制作出的监测系统实物可以通过按键设定报警浓度上限。当空气中天然气的浓度超过预定值时会出现声光双重报警,且制作成本较低。%A detection system for household natural gas pipeline leak was designed ,which has simple structure and ob⁃servable practicability. This system is based on the AT82S52 to collect signals. Several gas sensitive sensors were compared for a the most proper one according to the characteristics of natural gas. MQ⁃2 semiconductor gas sensitive sensor was used to detect natural gas pipeline leakage. System software is programmed by C language. The upper limit of alarm concentration can be set by a simple keyboard. Both sound and light alarm appears by the system when the gas concentration in the air is beyond the preset value. The cost to make the system is low.

  7. Four years of oil-free full-metal shut-off slides for gas pipelines; Vier Jahre oelfreie rein metallisch dichtende Gasabsperrschieber

    Energy Technology Data Exchange (ETDEWEB)

    Linstedt, Holger; Seewald, Gerhard; Fugmann, Kay [TEC artec valves GmbH und Co. KG, Oranienburg (Germany)

    2010-07-01

    After several years of operation, oil-filled shut-off slides will slowly have soiled gas pipelines. Oil-free full-metal shut-off slides are advantageous both from an ecological and technical view. Serial production will reduce the cost and shorten delivery times. The slide presented in this contribution also enables double block and bleed testing after installation. Horizontal slides open up new fields of application. Complete cross-joint slides have a particularly high cost reduction effect. Radio monitoring and control is possible in remote areas. (orig.)

  8. Simulation and Optimization of Peak Shaving Scenario for Natural Gas Pipeline Network%天然气集输管道调峰优化策略分析

    Institute of Scientific and Technical Information of China (English)

    李冉; 许淘淘; 张延祥; 张光通

    2015-01-01

    在本论文中,笔者首先介绍了天然气集输管道的现状及发展趋势,而后对天然气集输管道调峰优化的原则进行了分析,最后对调峰优化的策略进行了深入探讨.%The status in quo and trends of the natural gas pipeline are introduced in this paper along with the principles and tactics of optimization for peak load regulation.

  9. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2012-01-01

    Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst.......Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst....

  10. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... safety regulations in connection with the Class 1 location portion of a 7.4 mile natural gas pipeline to... regulations contained in 49 CFR 192.121, to construct and operate a dual natural gas pipeline (7.4 miles long... natural gas from the North Fork Unit and deliver it to a sales pipeline operated by Enstar Natural...

  11. Research on Design Coefficient of Oil and Gas Pipeline Based on Reliability%基于可靠性的油气管道设计系数研究

    Institute of Scientific and Technical Information of China (English)

    张宏; 顾晓婷; 赵丽恒

    2011-01-01

    Determination of oil and gas pipeline design coefficient based on experience was conservative in the previous strength design. Most studies at home and abroad demonstrated the feasibility of improving oil and gas pipeline design coefficient in theory, but it didn't give calculation method of design coefficient based on reliability. In this paper, stresssirength interference theory was introduced to the research on design coefficient of oil and gas pipeline. Taking the West to East Gas Pipeline Project and its second project for example, the reliability of pipeline without defect or with volume defect was calculated quantitatively under design coefficient of 0. 72 and 0. 8, practical measures were proposed, and the theories were provided to reduce the oil and gas pipeline wall thickness increase the transportation pressure and save the pipeline cost.%以往的油气管道强度设计中,设计系数的确定常常以经验为依据,比较保守.国内外大多数研究均是从理论上论证了提高油气管道设计系数的可行性,并没有给出基于可靠性的设计系数的计算方法.将应力-强度干涉理论引入油气管道设计系数的研究中,以西气东输一线及二线为例,定量计算了0.72和0.8两种设计系数下无缺陷管道和含体积型缺陷管道的可靠度,并提出了切实可行的措施,为油气管道降低壁厚,提高输送压力,节约管道成本提供了理论支持.

  12. Co-Production of Olefins, Fuels, and Electricity from Conventional Pipeline Gas and Shale Gas with Near-Zero CO2 Emissions. Part I: Process Development and Technical Performance

    Directory of Open Access Journals (Sweden)

    Yaser Khojasteh Salkuyeh

    2015-04-01

    Full Text Available A novel polygeneration process is presented in this paper that co-produces olefins, methanol, dimethyl ether, and electricity from conventional pipeline natural gas and different kinds of shale gases. Technical analyses of many variants of the process are performed, considering differences in power generation strategy and gas type. The technical analysis results show that the efficiency of the plant varies between 22%–57% (HHV depending on the product portfolio. The efficiency is higher than a traditional methanol-to-olefin process, which enables it to be competitive with traditional naphtha cracking plants.

  13. 49 CFR 192.627 - Tapping pipelines under pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Tapping pipelines under pressure. 192.627 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.627 Tapping pipelines under pressure. Each tap made on a pipeline under pressure must be performed by a crew qualified to...

  14. Dual-tree complex wavelet transform and SVD based acoustic noise reduction and its application in leak detection for natural gas pipeline

    Science.gov (United States)

    Yu, Xuchao; Liang, Wei; Zhang, Laibin; Jin, Hao; Qiu, Jingwei

    2016-05-01

    During the last decades, leak detection for natural gas pipeline has become one of the paramount concerns of pipeline operators and researchers across the globe. However, acoustic wave method has been proved to be an effective way to identify and localize leakage for gas pipeline. Considering the fact that noises inevitably exist in the acoustic signals collected, noise reduction should be enforced on the signals for subsequent data mining and analysis. Thus, an integrated acoustic noise reduction method based on DTCWT and SVD is proposed in this study. The method is put forward based on the idea that noise reduction strategy should match the characteristics of the noisy signal. According to previous studies, it is known that the energy of acoustic signals collected under leaking condition is mainly concentrated in low-frequency portion (0-100 Hz). And ultralow-frequency component (0-5 Hz), which is taken as the characteristic frequency band in this study, can propagate a relatively longer distance and be captured by sensors. Therefore, in order to filter the noises and to reserve the characteristic frequency band, DTCWT is taken as the core to conduct multilevel decomposition and refining for acoustic signals and SVD is employed to eliminate noises in non-characteristic bands. Both simulation and field experiments show that DTCWT-SVD is an excellent method for acoustic noise reduction. At the end of this study, application in leakage localization shows that it becomes much easier and a little more accurate to estimate the location of leak hole after noise reduction by DTCWT-SVD.

  15. Market evaluation and investment planning in natural gas industry in Brazil: development of the net distribution pipeline; Avaliacao de mercado e planejamento de investimentos na industria de gas natural no Brasil: perspectivas de crescimento da malha de gasodutos de distribuicao

    Energy Technology Data Exchange (ETDEWEB)

    Avila, Pedro L.; Pamplona, Edson O. [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)

    2008-07-01

    This paper proposes to develop a real options model to decision-making investments in flexible technologies. As a result, finding a closed-form solution, derived from the partial differential equation of the value of flexibility provided by alternative fuels. However, you can present and analysis the results of a practical application using the method to solve real options problems known as binomial model. Initially presents a brief explanation on the method of discounted cash flow, its failures and changes to the real options analysis. In the sequence chart an overview of the natural gas industry on Brazil, emphasizing the need for consistent investments evaluations in the sector. The next section shows the proposed development of mathematical model for assessing the flexibility to choose, obtained by the exchange of fuel for transport of gas pipeline distribution of natural gas. The model takes as the case scenario where the flexible pipeline can carry both natural gas and hydrogen, and the evaluation of the option of exchanging input gives more value to the investment opportunity, and consider the optimum conditions where the option to be exercised. Keywords: Decision Making, Real Options; Natural Gas, Flexible Technology. (author)

  16. 天然气长输管道危险陛分析%Safety Analysis of Long-distanmce Natural Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    蒋培科

    2011-01-01

    天然气是目前工业、居民主要的能源,近年来随着工业化、城市化进程的不断加快,天然气管道输送安全已经成为公共领域安全生产的重要方面。如何通过数值模拟计算,来辨识各类天然气管道危险等级,已经成为防范事故,实现源头控制的重要手段。%At present, natural gas is the main energy sources of industry and daily life. With the more and more rapid development of industrialization and urbanization, the safety of natural gas transportation pipeline has been an important aspect of public safety field. So, identifying the risk rank of different natural pipeline by numerical simulation has been an important means for controlling dangerous source and preventing accident.

  17. 天然气管道泄漏爆炸事故风险分析%Analysis of the Leak Explosion Risk of Natural Gas Pipeline

    Institute of Scientific and Technical Information of China (English)

    张国军; 高志国; 申龙涉; 王秋莎; 代堪亮; 赵虎; 袁玉

    2012-01-01

    针对天然气管道泄漏爆炸,采用爆炸冲击波超压模型,结合TNT当量法对超压进行理论计算,确定了其爆炸事故的伤害范围,找到了影响超压的主要影响因素,提出了减小冲击波超压的措施,为制订天然气管道安全运行及应急预案提供了依据.%Aiming at leak explosion of the natural gas pipeline, blast shock wave overpressure model was used, combining with TNT equivalent method to calculate the overpressure. Then the range of explosion damage was determine, and the main factors that affect the overpressure were found. Therefore the measures to reduce the overpressure were put forward, which provides the basis for the natural gas pipeline operation safe and emergency.

  18. Fluid-structure interaction analysis and lifetime estimation of a natural gas pipeline centrifugal compressor under near-choke and near-surge conditions

    Science.gov (United States)

    Ju, Yaping; Liu, Hui; Yao, Ziyun; Xing, Peng; Zhang, Chuhua

    2015-11-01

    Up to present, there have been no studies concerning the application of fluid-structure interaction (FSI) analysis to the lifetime estimation of multi-stage centrifugal compressors under dangerous unsteady aerodynamic excitations. In this paper, computational fluid dynamics (CFD) simulations of a three-stage natural gas pipeline centrifugal compressor are performed under near-choke and near-surge conditions, and the unsteady aerodynamic pressure acting on impeller blades are obtained. Then computational structural dynamics (CSD) analysis is conducted through a one-way coupling FSI model to predict alternating stresses in impeller blades. Finally, the compressor lifetime is estimated using the nominal stress approach. The FSI results show that the impellers of latter stages suffer larger fluctuation stresses but smaller mean stresses than those at preceding stages under near-choke and near-surge conditions. The most dangerous position in the compressor is found to be located near the leading edge of the last-stage impeller blade. Compressor lifetime estimation shows that the investigated compressor can run up to 102.7 h under the near-choke condition and 200.2 h under the near-surge condition. This study is expected to provide a scientific guidance for the operation safety of natural gas pipeline centrifugal compressors.

  19. The importance of environmental communications in gas pipeline projects; A importancia da pre-comunicacao ambiental no licenciamento, implantacao e operacao de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Figueiredo, Marcia Bartolini; Sarno, Ruy Alberto Campos [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The Environmental Pre-Communication is a tool developed to identify the profiles of communities surrounding the marked area (lifestyle, resources, fragilities, beliefs, culture and wishes), how they make their living, and production (community dependence relationship with ecosystems, such as rivers and subsistence areas), social organization, needs and expectations. Besides developing a social economic diagnostic, pre-communication prepares a community perception study. Regarding gas pipelines, the area of study comprehends 200 m towards each side of gas pipeline right-of-way in rural areas and 400 m towards each side in urban areas. Pre-Communication diagnostic, which is included in the process of environmental licensing, is aimed at subsidizing EIS (Environmental Impact Statement), providing data which help to elaborate mitigating and compensatory plans and programs. Moreover, diagnostic information make it possible to run public forums before Public Hearings take place, aiming at clarifying specific community issues related to construction and reduction of resistances, avoiding problems and conflicts. Also, during the entrepreneurship implementation phase, there is the advantage to know the bordering community and its daily activities, increasing the effectiveness of Environmental Programs. (author)

  20. Fluid-structure Interaction Analysis and Lifetime Estimation of a Natural Gas Pipeline Centrifugal Compressor under Near-choke and Near-surge Conditions

    Institute of Scientific and Technical Information of China (English)

    JU Yaping; LIU Hui; YAO Ziyun; XING Peng; ZHANG Chuhua

    2015-01-01

    Up to present, there have been no studies concerning the application of fluid-structure interaction (FSI) analysis to the lifetime estimation of multi-stage centrifugal compressors under dangerous unsteady aerodynamic excitations. In this paper, computational fluid dynamics (CFD) simulations of a three-stage natural gas pipeline centrifugal compressor are performed under near-choke and near-surge conditions, and the unsteady aerodynamic pressure acting on impeller blades are obtained. Then computational structural dynamics (CSD) analysis is conducted through a one-way coupling FSI model to predict alternating stresses in impeller blades. Finally, the compressor lifetime is estimated using the nominal stress approach. The FSI results show that the impellers of latter stages suffer larger fluctuation stresses but smaller mean stresses than those at preceding stages under near-choke and near-surge conditions. The most dangerous position in the compressor is found to be located near the leading edge of the last-stage impeller blade. Compressor lifetime estimation shows that the investigated compressor can run up to 102.7 h under the near-choke condition and 200.2 h under the near-surge condition. This study is expected to provide a scientific guidance for the operation safety of natural gas pipeline centrifugal compressors.