  1. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  2. Safety upgrading of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. It consist of next chapters: (1) Introductory speeches; (2) Nuclear power plant WWER 440; (3) Safety improvement; (4) Bohunice Nuclear power plants subsidiary; (5) Siemens; (6) REKON; (7) VUJE Trnava, Inc. - Engineering, Design and Research Organisation; (8) Album

  3. Heat delivery from Bohunice NPP, Slovakia

    International Nuclear Information System (INIS)

    Paley, I.

    1998-01-01

    Experience with nuclear district heating in the Slovak Republic is reported. The heating system of the town of Trnava is supplied by the Bohunice NPP and conventional sources. Construction of the hot water heating system from the Bohunice NPP began in 1983. Commercial operation began on 10 December 1987. Heat delivery has gradually increased from 478 TJ in 1988, to 1,104 TJ in 1995. The heat cost is low, resulting in an increasing number of consumers. (author)

  4. Lifetime evaluation of Bohunice NPP components

    International Nuclear Information System (INIS)

    Kupca, L.

    2001-01-01

    The paper discuss some aspects of the main primary components lifetime evaluation program in Bohunice NPP which is performed by Nuclear Power Plant Research Institute (NPPRI) Trnava in cooperation with Bohunice and other organizations involved. Facts presented here are based on the NPPRI research report which is regularly issued after each reactor fuel campaign under conditions of project resulted from the contract between NPPRI and Bohunice NPP. For the calculations, there has been used some computer codes adapted (or made) by NPPRI and the results are just the conclusive and very brief, presented here in Tables (Figures). (authors)

  5. NPP Bohunice experience with ASSET services

    International Nuclear Information System (INIS)

    Klimo, J.

    1996-01-01

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author)

  6. NPP Bohunice experience with ASSET services

    Energy Technology Data Exchange (ETDEWEB)

    Klimo, J [Bohunice NPP (Slovakia)

    1997-12-31

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author).

  7. Operational experiences feedback in Bohunice NPP

    Energy Technology Data Exchange (ETDEWEB)

    Betak, A [NPP Bohunice (Slovakia)

    1997-10-01

    The presentation reviews the following issues: OEF team in Bohunice NPP - structure; training and qualification: ASSET seminars on Prevention of incidents - INES manual handling, NRA-NRC the training on event investigation methods, NU - the training on HPES; legislation - documentation prepared in the frame of QA programme; results of OEF team activities; ASSET mission Dukovany - Experiences; the perspective activities.

  8. Safety enhancement in NPP Bohunice

    International Nuclear Information System (INIS)

    Lipar, M.; Mihalik, M.

    1997-01-01

    The upgrading and safety enhancement of both the Bohunice V-1 and V-2 reactors is described in detail. The total estimated cost of the gradual reconstruction of these two units during 1996 to 1999 is 180 mil. US dollars. For the 1995 to 1997 period, the actions common for both units include a quality assurance programme, a personnel training programme, installation of a multifunction simulator, implementation of symptom-oriented operation procedures, installation of diagnostic systems, of a site security system, and of a teledosimetric system. At present, the main maintenance tasks are: to carry out major repair of units, to remedy service interruptions, to enhance equipment service availability, to enhance the technical level of corrective actions at equipment. Investment into maintenance level upgrade has grown from 7.5 mil. Slovak crowns in 1994 to estimated 32 mil. in 2000. The partners of international cooperation are mentioned. (M.D.)

  9. Optimization of radiation protection at Bohunice NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Svitek, J.

    2003-01-01

    Bohunice Nuclear Power Plant is situated in south - western part of Slovakia about 50 km away from Bratislava. There are four PWR reactors 440 MW e each - two units with reactors WWER - 230 (V1 NPP) and two units with WWER - 213 (V2 NPP). requirements for the optimization process are given in the mentioned Code No.12 of Ministry of Health. Code 12 stipulates the technical and organizational requirements for proving the Rational Achievable Level (RAL) of radiation protection. This level can be proved by means of the comparison of the dose distribution to the costs of protection. An example of two figures of dose constraints is: collective dose 20 man mSv for the specific task; individual exposure 1 mSv per day. The values of the financial equivalents of personal exposure - so called the alpha coefficients - are used for the calculation of the benefit of proposed measures. Impact of legislative changes into Bohunice NPP and optimization process are presented. Apparently the new law and the associate code created a base of transparent and understandable policy of radiation protection and optimization in Slovak Republic. The radiation protection legislative was implemented into the praxis and persons became familiar with it. Defining clear and unambiguous terms facilitated the communication between users and the regulatory body - State Health Institute. Optimization was generally accepted by the workers and managers and began to be a part of safety culture of operation at nuclear power plants. (authors)

  10. Experience of Bohunice V-1 NPP

    International Nuclear Information System (INIS)

    Dobik, Dobroslav

    2000-01-01

    Slovakia remains significantly dependent on imports of primary energy sources, which represent as much as 80% of the demand. Of the total consumption of electricity in Slovakia, 40% was generated in nuclear power plant units in 1998. Slovakia operates 6 units with WWER 440 nuclear reactors. Slovakia is the signatory of all important international agreements and conventions in the field of nuclear energy, and its legislation is in an advanced stage of approximation to European Union law. This is a very important aspect, showing Slovakia's approach to nuclear safety. In 1993 Slovakia accepted the commitments of the UN Convention on Climate Changes, including a reduction of greenhouse gases to 1990 levels by the year 2000. Moreover, as an internal target Slovakia has set the reaching of the 'Toronto Objective', i.e. 20% reduction in CO x , emissions through the year 2005 as compared to 1988. In our opinion, this is not possible without nuclear energy. Time has shown, that the political aspects are more powerful, especially if you underestimate their importance over the than the technical ones. In the case of Bohunice V-1 NPP the political aspects were on the following levels: 1. Slovak republic (Czechoslovakia), political changes, decisions of the government; 2. European Union - Agenda 2000, Accession criteria, nuclear safety criteria, EBRD; 3. Austria as a neighbouring country. Starting with year 1990, 23 expert missions took place at Bohunice V-1 NPP by now. The only criteria for further operation should have been Nuclear safety, which is supervised by NRA SR. It was fully in compliance with EU policy, each country is solely responsible for its energy sector and for nuclear energy use. Our satisfaction lasted not too long. Following negotiation with EU on the highest political level, driven by willingness to be invited for negotiation of accession on the Helsinki Summit, the Slovak government decided on September 14th, on Bohunice V-1 Units shutdown in 2006 and 2008

  11. Modernization and safety improvement project of the NPP V-2 Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    2000-01-01

    This contribution deals with the form, present state, and results of the Nuclear Power Plants Research Institute (the Slovak acronym is VUJE - Vyskumny Ustav Jadrovych Elektrarni) participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project. A short description of VUJE history, activity, and results is also presented as well as NPPs Jaslovske Bohunice characterization. VUJE was established in 1977 and deals with scientific and research needs of nuclear power plants, such as design, construction, commissioning and operation. The next fields of VUJE activity are, NPP reconstruction, NPP personnel training, radioactive waste management technology, and NPP decommissioning. The nuclear power plant, Jaslovske Bohunice, is situated approximately 15 km from the district town of Trnava in the southwestern region of the Slovak Republic. The construction of the first Czechoslovak NPP A-1 began on this site in 1957 .The construction of the double-unit NPP V-1 with WWER-440 (type V-230) reactor began in 1972. The first unit of NPP V-1 began operation in 1978 and the second in 1980. NPPs construction on the Bohunice site continued with NPP V-2, which has two units with WWER-440 (type V-213) reactors. Unit 1 and Unit 2 of NPP V-2 were commissioned in 1984 and 1985, respectively. Slovak electric utility Slovenske elektrarne (SE) is the owner/commissioner of NPP V-2. This NPP is responsible for more than 20% of the total electrical energy production of SE, making it an essential supporter of the Slovak economy. (authors)

  12. Fuel leak testing performance at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Slugen, V.; Krnac, S.; Smiesko, I.

    1995-01-01

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR's. 1 tab., 2 figs., 3 refs

  13. Fuel leak testing performance at NPP Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slugen, V; Krnac, S [Slovak Technical Univ., Bratislava (Slovakia); Smiesko, I [Nuclear Powr Plant EBO, Jaslovske Bohuce (Slovakia)

    1996-12-31

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR`s. 1 tab., 2 figs., 3 refs.

  14. Metamorphosis of NPP A1, V1, V2

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.

    2005-01-01

    In this book the history of construction, commissioning and exploitation of NPP A1, NPP V1 and NPP V2 in Jaslovske Bohunice is presented on documentary photos. Vicinity around of these NPPs is presented, too

  15. The Bohunice NPP V-1 units nuclear safety upgrading

    International Nuclear Information System (INIS)

    Mlcuch, M.

    2000-01-01

    Safety upgrading and operational reliability improvement was carried out by the Bohunice NPP V-1 staff continuously since the plant commissioning. By now, more than 1200 minor or major modifications have been implemented, either by the NPP maintenance staff or by the contractors. Based on findings of safety assessment missions invited by Bohunice NPP in 1990 - 1991, the Czecho-slovak Nuclear Regulatory Authority (CSKAE) issued the decision No. 5/91 of 81 safety upgrading measures to be taken in different areas. These improvements are referred to as the 'Small Reconstruction of the Bohunice V-1 NPP'. Realization of measures during Small reconstruction of the Bohunice NPP V-1 became a power plant, which further operation is acceptable from safety point of view, but it is also necessary further safety improvement. During the period of the Small Reconstruction the development of a Safety Report for the Gradual reconstruction has been completed. Based on this report the SR Nuclear Regulatory Authority issued the Decision No. 1/94, in which requires 59 upgrading measures in different areas to be addressed. The development of Basic Engineering of the Gradual Reconstruction has been contracted to the Siemens AG. Implementation of safety measures are provided through contract with the consortium REKON (which consists of Siemens AG company and Nuclear Power Plants Research Institute Trnava) and other Czech, Russian and Slovak companies. The Gradual Reconstruction of Bohunice NPP V-1 will be finished in 2000. By implementation of the measures carried out during Gradual Reconstruction achievement of an internationally acceptable nuclear safety level will be reached. (author)

  16. Radiation protection in Bohunice NPP. Description of present status

    International Nuclear Information System (INIS)

    Dobis, L.

    2001-01-01

    Radiation protection (RP) at Bohunice NPP has reached the high international standard. The fact was approved by several independent international missions (OSART , WANO, WENRA, ...). A lot of modifications have been done in order to improve the standard of radiation protection. All the BSS requirements have been implemented into the plant regulations before the State Law No 290/1996 and 470/2000 came into the force. Internal audits are regularly performed at NPP in order to reveal potential deficiencies. In 2001 there were 4 such audits focused on quality assurance, software operation, LBB concept and limits and condition of safe operation. State Health Institute, the regulatory body in the radiation protection, performs the inspection at least ones a month. Good relationship with the inspectors of State Health Institute also contributes to the safe operation of the NPP. There were not any radiation accident. All anomalies or radiation events are investigated at a plant level. The results of root cause analysis and proposal of corrective actions are provided to IAEA and WANO databases for the distribution. The Radiation protection department of Bohunice NPP cooperates with the other Czech and Slovak NPPs. Regular meetings on radiation protection and lately also on emergency preparedness are organized. The cooperation is excellent. Occupational exposure is reviewed also with respect of ISOE data. Bohunice NPP (even with high dose burden caused by reconstruction of V1 NPP) can be found in the first half of world PWR speaking about the collective exposure per reactor. V2 NPP itself reaches the lowest collective exposure in the world. All doses are below the limits and kept ALARA. ALARA system has been established already in 1997 at Bohunice NPP and its results are obvious for example looking at dose results during the reconstruction works at V1 NPP. The operation of Bohunice NPP has negligible influence to its surroundings. The values of gas and liquid effluents move

  17. Personnel education and training at Bohunice NPP

    International Nuclear Information System (INIS)

    Malovec, J.

    1998-01-01

    Procedure for education and training of all the personnel employed at Bohunice Nuclear power plant is presented in detail describing the training system structure, kinds of training, staff members qualification development, short term and long term tasks needed to assure attaining the training objectives. The proposed Staff Members Lifetime education implementation project contains basic starting points, measures to be implemented by 1998. It was prepared on the basis of a primary analysis which confirmed the existing need for implementing the lifetime education system

  18. Risk-informed decision making during Bohunice NPP safety upgrading

    International Nuclear Information System (INIS)

    Lipar, M.; Muzikova, E.; Kubanyi, J.

    2001-01-01

    The paper summarizes some facts of risk-informed regulation developments within UJD regulatory environment. Based on national as well as international operating experience and indications resulted from PSA, Nuclear Regulatory Authority of the Slovak Republic (UJD) since its constituting in 1993 has devoted an effort to use PSA technology to support the regulatory policy in Slovakia. The PSA is considered a complement, not a substitute, to the deterministic approach. Suchlike integrated approach is used in decision making processes and the final decision on scope and priorities is based on it. The paper outlines risk insights used in the decision making process concerning Bohunice NPP safety upgrading and focuses on the role of PSA results in Gradual Reconstruction of Bohunice VI NPP. Besides, two other examples of the PSA results application to the decision making process are provided: the assessment of proposal of modifications to the main power supply diagram (incorporation of generator switches) and the assessment of licensee request for motor generator AOT (Allowable Outage Time) extension. As an example of improving support of Bohunice V-2 risk-informed operations, concept of AOT calculations and Bohunice V-2 Risk Monitor Project are briefly described. (author)

  19. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2009-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  20. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2008-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  1. New Emergency control center of Slovenske Elektrarne Bohunice NPP

    International Nuclear Information System (INIS)

    Pecko, E.

    2012-01-01

    Emergency preparedness of nuclear power plant and operation assurance in case of a possible emergency calls to have devices for emergency response with equipment for rapid detection and continuous evaluation of anticipated events. Chief executive body designated to manage a nuclear power plant during major events is the emergency committee (EC). Emergency Committee is a part of the Emergency Response Organization (ERO). The following centers are on alert to ensure the activities of the ERO - Emergency Response office: - control room (CR) and emergency control room (ECR); - emergency management center (EMC); - Monitoring Centre (MC); - emergency backup control center (EBCC); - congregations of civil protection (CP) and CP shelters; - communications with warning and notification system (VARVYR). From a historical and practical point of view in the vicinity of Jaslovske Bohunice has been set up a joint emergency control center. The center was located on the territory of the former already inoperative V1 NPP. V1 NPP is currently integrated into the organizational structure of JAVYS. Operating Bohunice V2 NPP plant is a designated part of the Slovenske Elektrarne, a. s., whose majority owner is an Italian operator ENEL. In terms of various relevant factors, it was decided to build a new emergency management center on the territory of operating V2 NPP, meet the current standards.

  2. Monitoring of Persons at the Exit from Bohunice NPP

    International Nuclear Information System (INIS)

    Kaizer, J.; Svitek, J.

    2001-01-01

    Full text: IAEA defines the principal requirement 'defence in depth' as a multilayer system in its authorised document - International Basic Safety Standards for Protection against Ionising Radiation, Safety Series No. 115. The principle of the multilayer system is: a failure at one zone is compensated or corrected at subsequent zones. The main argument why Bohunice NPP modernised its monitoring system at the exit from NPP was the implementation of the principle 'defence in depth'. Several instruments PM7 (Eberline) equipped with the plastic scintillation detectors had been bought because of the modernisation. The instruments had to be integrated into overall security system NPP without any restriction to the number of passing people. The supplier had to modify the basic instrument operation. NPP required a 'dynamic' monitoring version, this means the operation without stopping of a person within the instrument. After the modification the value of the RDA (Reliable Detectable Activity) of the instruments PM7 was within the interval 9.25-10.4 kBq for 137 Cs (dotted source in the middle of the instrument). RDA for the mix of activation products was 2-3 times lower. In conclusion of our paper the results of the monitoring are presented within tree years as well as a discussion about these results. Maximum values of contaminations measured were very low (several kBq) that represented very low risk from potential exposure. (author)

  3. Monitoring of activity of the persons and vehicles at the exit from the NPP Bohunice

    International Nuclear Information System (INIS)

    Dobis, L.; Kaizer, J.; Svitek, J.

    1998-01-01

    In this paper the technical description of the monitoring of activity of the persons and vehicles at the exit from the NPP Bohunice as well as the results of monitoring during last six months are described

  4. Chemistry monitoring and diagnostic system at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Smiesko, Ivan; Figedy, Stefan

    2012-09-01

    This paper provides a description of water chemistry monitoring and diagnostic system installed at Slovak NPP Jaslovske Bohunice. System has complex architecture and covers laboratory data, chemistry and radiochemistry on-line monitoring data, process data acquisition and processing and diagnostics. Pre-filtered data from process computer and chemistry on-line monitors are recorded together with laboratory data in the ORACLE-based information system CHEMIS with many presentation and processing features. Brief information is given about the basic features of a newly developed diagnostic system for early detection and identification of anomalies incoming in the water chemistry regime of the primary and secondary circuit of VVER-440 type unit. This system, called SACHER (System of Analysis of Chemical Regime) has been installed within the major modernization project at the NPP Bohunice in the Slovak Republic. System SACHER has been developed fully in MATLAB environment. Diagnostic system works exclusively with available on-line data as an operation personnel support application allowing effective response to adverse chemistry events/trends. The availability of prompt information about the chemical conditions of the primary and secondary circuit is very important in order to prevent the undue corrosion and deposit build-up processes within the plant systems. The typical chemical information systems that exist and work at the NPPs give the user values of the measured quantities together with their time trends and other derived values. It is then the experienced user's role to recognize the situation the monitored process is in and make the subsequent decisions and take the measures. The SACHER system, based on the computational intelligence techniques, inserts the elements of intelligence into the overall chemical information system. It has the modular structure with the following most important modules: - normality module- its aim is to recognize that the process

  5. Principles and criteria for environmental restoration of the contaminated banks near NPP Bohunice

    International Nuclear Information System (INIS)

    Slavik, O.; Moravek, J.

    1995-01-01

    The 18 km long banks of the Bohunice NPP waste water recipient are contaminated by 137 Cs as a result of two accidents on the CO 2 cooled NPP-A1 unit in 1976 and 1977. Contamination acceptance limits 6 or 8 Bq 137 Cslg of soil, depending on contaminated area size, were derived on the basis of developed principles, and approved by the authorities. Removing and safe burial of 1,100 m 3 of contaminated soil from steep area and 15 cm thick clean soil covering on about 1ha of flat area of the contaminated banks is planned in frame of the re-considered restoration project implementation in 1995/96. (author)

  6. Bituminization plant Jaslovske Bohunice

    International Nuclear Information System (INIS)

    1999-01-01

    In this leaflet the principle of the bituminization plant for radioactive concentrate (the intermediate liquid radioactive waste generated during the NPP A1, V-1, V-2 operations) solidification used in the Bohunice Radwaste Treatment Centre (BSC RAO) is presented

  7. Programmes design for Bohunice NPP personnel other than control room operators

    International Nuclear Information System (INIS)

    Kalincik, L.

    2002-01-01

    This paper deals with project development of training programmes for non-licenced NPP personnel-masters, field operators, maintenance and technical supporting personnel. The programme development focuses on the part stage and on the job training at NPP. Bohunice NPP belongs to plants with higher specific number of personnel per installed power capacity. This factor also influenced the choice of programmes design. Undermentioned procedure is one of various approaches to SAT exploitation for training programmes design. (author)

  8. Planning for environmental restoration of the contaminated banks near NPP Bohunice

    International Nuclear Information System (INIS)

    Slavik, O.; Moravek, J.; Vladar, M.

    1995-01-01

    The 18 km long banks of the Bohunice NPP waste water recipient are contaminated by cesium-137 as a result of two accidents on the CO 2 cooled NPP A 1 unit in 1976 and 1977. Since 1992, all he contaminated waste waters dumping from NPP Bohunice has been carried out directly to the Vah River through a specially constructed 15 km long pipeline. The final extent of contamination in the Bohunice site is represented. The overall contaminated area in this site with cesium-137 activity above 1 Bq/g of soil is about 67000 m 2 and thus, the corresponding volume of top 20 cm thick soil layer is about 13000 m 3 . For optimizing less costly remedial measures (warning signs...) an agreed scenario with a pre-estimated factor factor collective dose 2.10 -7 man.Sv.y -1 /(m 2 .Bq 137 Cs.g -1 ) was applied. Limitation of individual effective doses according to a site specific stay scenario was also considered for this purposes with a limiting value of 0.25 mSv/y. Cost analysis of available remedial techniques were carried out, too. Two techniques have been selected for the contaminated banks restoration project: 1) removing/disposal of 20 cm soil top layer from steep and unengineered banks, and 2) mechanical dilution/fixation of contamination by clean 15 cm soil cover for the contaminated flat areas. Two-fold reduction of anticipated potential radiation risk were accepted, maximally, for the lastly mentioned technique, however cost saving is considerable (about 10-time lower the cost comparing to removing/disposal technique one). The basic acceptance limits AL for 137 Cs in soil and criteria size of continuously contaminated bank areas were derived as: AL 200 = 6.0 Bq/g and 800 m 2 (300 m) or AL 50 8.0 Bq/g and 200 m 2 (80 m) for removing/disposal of the soil on steep unengineered banks. For clean soil covering technique the resulting limits are in an interval AL 50C = 8 up to 16 Bq/g. According to the criteria developed, it is necessary to subject to restoration about 11000 m 2 of

  9. Preliminary results of scoop samples analysis from reactor pressure vessels of Bohunice V-1 NPP

    International Nuclear Information System (INIS)

    Kupca, L.

    1997-01-01

    In the paper are presented the main goals and results from the scoop specimen analysis performed on the both RPVs WWER-440/230 in Jaslovske Bohunice V-1 NPPs. Main tasks of this complex activity were: model experiments for analysis procedures optimisation; chemical analysis; hardness measurements on the RPV and bulk samples; microstructure analysis; scanning electron microscope and microprobe analysis; gamma spectrometry; brittle fracture temperature evaluation; trends of brittle fracture temperature growth after annealing procedure. In conclusions and recommendations are discussed the planned activities in the field of both RPVs integrity evaluation for the future operation of the NPP Jaslovske Bohunice V-1. (author)

  10. Decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    Anon

    2009-01-01

    In this presentation the Operation history of A1 NPP, Project 'Decommissioning of A1 NPP' - I stage, Project 'Decommissioning of A1 NPP ' - II stage and Next stages of Project 'Decommissioning of A1 NPP ' are discussed.

  11. Resin intrusion into the primary circuit of NPP Jaslovske Bohunice V-1

    International Nuclear Information System (INIS)

    Grezdo, O.; Mraz, V.

    2005-01-01

    During the refueling at the first unit of Bohunice NPP in 2005 a lot of sediment was found on the upper storage rack. This sediment was identification as a filter resin. Resin was found in most of the fuel assemblies, pipes and tanks of the primary circuit and his auxiliary systems. Resin producer and WANO network was contacted in order to get information about similar events. Management of Bohunice NPP made a decision that primary circuit, fuel assemblies and auxiliary systems have to be cleaned. Subsequent cleaning extended outage by 31 days. This paper summarizes causes, existing consequences and corrective actions. Accent was put on the hydraulic characteristics of the primary circuit measurement, power distribution core monitoring and the primary circuit water quality verification (Authors)

  12. Practical experience with the leaky-fuel monitoring at Bohunice NPP

    International Nuclear Information System (INIS)

    Kacmar, M.; Cizek, J.

    2001-01-01

    The first part of this paper describes practical experience with the fuel monitoring in operating reactors from point of view possible leakages. Summarized in the paper are numbers leaky fuel assemblies both for NPP and for particular units. Some failure causes are discussed for operational conditions of Bohunice NPP. In the second part of paper critical power ramps on hot fuel rod of leaky fuel assemblies are analysed to eliminate failures from PCI. The main aim of the paper is the need to understand the mechanism and causes of failures (Authors)

  13. Project Management Unit for decommissioning of NPP Bohunice VI (2003-2014)

    International Nuclear Information System (INIS)

    Gonzalez Fernandez-conde, A.; Brochet, I.; Ferreira, A.

    2015-01-01

    From October 2003 until december 2014 the Consortium consisting of Iberdrola Engineering and Construction (leader). Empresarios Agrupados Internacional, and Indra Sistemas has carried out the project Project Management Unit ((PMU) for the decommissioning of Bohunice V1 NPP (units 1 and 2), type VVER-440/V-230 in Slovakia. during the first phase (2003-2007) EdF was also part of the Consortium. The project is funded by the Bohunice International Decommissioning Support Fund (BIDSF) administered by the RBRD. The main objective of the project is to provide the necessary engineering and resources of project management for planning, execution, management, coordination and monitoring of all tasks in support of the decommissioning. (Author)

  14. Thirtieth anniversary of reactor accident in A-1 Nuclear Power Plant Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Kuruc, J.; Matel, L.

    2007-01-01

    The facts about reactor accidents in A-1 Nuclear Power Plant Jaslovske Bohunice, Slovakia are presented. There was the reactor KS150 (HWGCR) cooled with carbon dioxide and moderated with heavy water. A-1 NPP was commissioned on December 25, 1972. The first reactor accident happened on January 5, 1976 during fuel loading. This accident has not been evaluated according to the INES scale up to the present time. The second serious accident in A-1 NPP occurred on February 22, 1977 also during fuel loading. This INES level 4 of reactor accident resulted in damaged fuel integrity with extensive corrosion damage of fuel cladding and release of radioactivity into the plant area. The A-1 NPP was consecutively shut down and is being decommissioned in the present time. Both reactor accidents are described briefly. Some radioecological and radiobiological consequences of accidents and contamination of area of A-1 NPP as well as of Manivier Canal and Dudvah River as result of flooding during the decommissioning are presented (authors)

  15. Commissioning tests at Bohunice NPP V1 unit 2 after reconstruction in 1998

    International Nuclear Information System (INIS)

    Pajtinka, A.; Tvaroska, V.; Wiening, K.-H.; Mueller, B.

    2000-01-01

    The last and the most extensive stage in the reconstruction project of the Bohunice NPP started in July 1998. The main activities performed during a 6-month scheduled unit 2 outage included: - Installation of a new emergency core cooling system with an increased capacity according to the defined broader break spectrum for LOCA; - Reconstruction of the existing confinement spray system and installation of a new confinement pressure suppression system; - Completion of upgrading measures to increase the reliability of emergency power supply systems (replacement of low voltage switchgear, installation of new cabling for all loads important to safety, installation of new motor-generators and rectifier sets); - Connection to the plant and commissioning of the new reactor protection system. Comprehensive tests and checks performed on completion of installation work on the modified mechanical, electrical and I and C systems were important reasons for the absence of major problems during restart of the unit after the several project implementation phases. Operating experience at unit 2 since its recommissioning in January 1999 has confirmed that the required safety standards have been met and that operational reliability has been substantially increased at the sometime. Periodic testing is being performed in accordance with the limits and conditions for safe operation of Bohunice NPP. To date all these tests were completed without significant problems. The functions implemented in the new technology met the test program criteria, which were approved with authority, in all essential areas. Through the close cooperation of the partners involved and through the combined efforts of the various engineering and operating disciplines, technical and scheduling problems could be immediately identified and quickly resolved. In general, these kinds of projects require optimum cooperation among the parties involved. Modernization of the NPP Bohunice V1 unit 2 has shown, that all

  16. Status of steam generator tubing integrity at Jaslovske Bohunice NPP

    International Nuclear Information System (INIS)

    Cepcek, S.

    1997-01-01

    Steam generator represents one of the most important component of nuclear power plants. Especially, loss of tubing integrity of steam generators can lead to the primary coolant leak to secondary circuit and in worse cases to the unit shut down or to the PTS events occurrence. Therefore, to ensure the steam generator tubing integrity and the current knowledge about tube degradation propagation and development is of the highest importance. In this paper the present status of steam generator tubing integrity in operated NPP in Slovak Republic is presented

  17. The preliminary results of the thermal annealing processes performed on the RPVs NPP V-1 in Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L; Brezina, M; Beno, P [Vyskumny Ustav Jadrovych Elektrarni, Trnava (Slovakia)

    1994-12-31

    Samples of weld and base metal above and below the weld were taken from RPV material in the V-230 type NPP V-1 in Bohunice; hardness measurements were carried out across the weld on the external surface of the RPV under the thermal shielding, before and after annealing. Results are presented and the annealing procedure efficiency is discussed. (authors). 13 refs., 5 figs.

  18. Planning for environmental restoration of the contaminated banks near NPP Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slavik, O; Moravek, J [Nuclear Power Plants Research Institute, a.s., Trnava (Slovakia); Vladar, M [Inst. of Preventive and Clinical Medicine, Bratislava (Slovakia)

    1996-12-31

    The 18 km long banks of the Bohunice NPP waste water recipient are contaminated by cesium-137 as a result of two accidents on the CO{sub 2} cooled NPP A{sub 1} unit in 1976 and 1977. Since 1992, all he contaminated waste waters dumping from NPP Bohunice has been carried out directly to the Vah River through a specially constructed 15 km long pipeline. The final extent of contamination in the Bohunice site is represented. The overall contaminated area in this site with cesium-137 activity above 1 Bq/g of soil is about 67000 m{sup 2} and thus, the corresponding volume of top 20 cm thick soil layer is about 13000 m{sup 3}. For optimizing less costly remedial measures (warning signs...) an agreed scenario with a pre-estimated factor factor collective dose 2.10{sup -7} man.Sv.y{sup -1}/(m{sup 2}.Bq{sup 137}Cs.g{sup -1}) was applied. Limitation of individual effective doses according to a site specific stay scenario was also considered for this purposes with a limiting value of 0.25 mSv/y. Cost analysis of available remedial techniques were carried out, too. Two techniques have been selected for the contaminated banks restoration project: 1) removing/disposal of 20 cm soil top layer from steep and unengineered banks, and 2) mechanical dilution/fixation of contamination by clean 15 cm soil cover for the contaminated flat areas. Two-fold reduction of anticipated potential radiation risk were accepted, maximally, for the lastly mentioned technique, however cost saving is considerable (about 10-time lower the cost comparing to removing/disposal technique one). The basic acceptance limits AL for {sup 137}Cs in soil and criteria size of continuously contaminated bank areas were derived as: AL{sub 200} = 6.0 Bq/g and 800 m{sup 2} (300 m) or AL{sub 50} 8.0 Bq/g and 200 m{sup 2} (80 m) for removing/disposal of the soil on steep unengineered banks. For clean soil covering technique the resulting limits are in an interval AL{sub 50C} = 8 up to 16 Bq/g. (Abstract Truncated)

  19. Fuel utilization experience in Bohunice NPP and regulatory requirements for implementation of progressive fuel management strategies

    Energy Technology Data Exchange (ETDEWEB)

    Patenyi, V [Nuclear Regulatory Authority, Bratislava (Slovakia); Darilek, P; Majercik, J [Vyskumny Ustav Jadrovych Elektrarni, Trnava (Slovakia)

    1994-12-31

    The experience gained in fuel utilization and the basic requirements for fuel licensing in the Slovak NPPs is described. The original project of WWER-440 reactors supposes 3-year fuel cycle with cycle length of about 320 full power days (FPD). Since 1984 it was reduced to 290 FPD. Based on the experience of other countries, a 4-year fuel cycle utilization started in 1987. It is illustrated with data from the Bohunice NPP units. Among 504 fuel assemblies left for the fourth burnup cycle no leakage was observed. The mean burnup achieved in the different units varied from 33.1 to 38.5 Mwd/kg U. The new fuel assemblies used are different from the recent ones in construction, thermohydraulics, water-uranium ratio, enrichment and material design. To meet the safety criteria, regulatory requirements for exploitation of new fuel in WWER-440 were formulated by the Nuclear Regulatory Authority of Slovak Republic. 1 tab., 5 refs.

  20. Main features of buildings and structures important to safety of units V1 and V2 of Bohunice NPP

    International Nuclear Information System (INIS)

    David, M.

    1993-01-01

    The program of seismic upgrading of Bohunice NPPs has been started in the year 1989 (after finishing of new seismic input). Since that time the seismic upgrading of Main building of NPP V1 has already been realized, structural as well as technological parts. Beside that the designs of seismic upgrading of other structures of NPP V1 and V2 have been completed. It has been proved that the seismic upgrading of NPPs with reactors WWER 440 is very complicated, but still possible, even in the case with high seismic intensity. It would be not possible to fulfill this complicated task without the help of IAEA Missions. The activities of IAEA experts in the program of Bohunice NPPs upgrading are appreciated very much

  1. Analysis of the mortality development of the population in the surroundings of Bohunice NPP using Fuzzy logic methods

    International Nuclear Information System (INIS)

    Letkovicova, M.; Durov, M.; Stehlikova, B.

    2001-01-01

    We pursue the vicinity of Bohunice NPP. The vicinity has cyclic form with radius of 30 km, what represents an area approximately 2 800 km 2 . This area of pursued vicinity is requisite by the security report of Bohunice NPP. To the presumptive calculations we used the complete databases of Register of death, Register of municipalities and of Register of age structure of the inhabitants of the Slovak republic from 1993 to 1999, fully-fashioned in Statistical authority of the Slovak republic. We work with databases, which don't contain personal identifications. We pursue the evolution of the mortality by the indicators of the mortality, calculated by the WHO. By the literary sources and by our experience is necessary the sum at least of three years to calculation of stable demographic and epidemiological parameters. Therefore we work with the method of short time series. The basic observed unit, which is represented by one value of the indicator, is one municipality. All our assessing analyses are calculated from triennial sums of all indicators, so we work with man-years. Advanced report is the adjusted extract from Complex report on situation of environment and health of the inhabitants in vicinity of Bohunice NPP in 1999, which was advanced by our society in March 2001. (authors)

  2. Evaluation of seismic resistance of low voltage switchgear, NPP V1 Jaslovske Bohunice, Slovakia

    International Nuclear Information System (INIS)

    Zeman, P.

    1999-01-01

    During this year, company Stevenson and Associates took part in the project of evaluation of seismic resistance of NPP V-1 Jaslovske Bohunice in Slovakia. It was responsible for a part of electrical equipment, mainly for the evaluation of low voltage switchgears. There were four steps of the evaluation: Detailed Walkdown; Application of GIP-WWER Methodology; Developing, of In Cabinet Response Spectra; and Evaluation of Acceptance of Formerly Performed Relay Tests According to the Russian Standard OEG l-330.00-3). Tests performed according to the Russian Standard OAG are acceptable only if the tested subject shows just one dominant natural frequency in the significant energy frequency range. If there is no knowledge of modal properties of the tested subject (that is a frequent situation because test reports usually contain only generalized Fourier loading spectrum) the enveloping of In Cabinet Response Spectra (ICRS) in all significant energy frequency ranges by Response Spectra (RS) of harmonic signal on one arbitrary frequency. This criteria is usually not satisfied because the shake tables used for the tests are not able to produce the sufficient level of excitation in the low frequency range. It may lead to the demand for test repeating

  3. Information letter 6. Information about operation of GovCo, a.s. and plant SE-NPP Bohunice during June 2006

    International Nuclear Information System (INIS)

    2006-07-01

    In this leaflet results of exploitation of four units of the Bohunice V-1 and V-2 NPPs are presented. The electricity and heat production in June 2006 are reviewed. Within a June 2006 the electricity was produced in GovCo, a.s.: 289.150 GWh (block 1), 262.103 GWh (block 2), totally 551.253 GWh, and 321.515 GWh within a January - June 2006 and in SE-EBO, NPP V2: 278.896 GWh (block 3), 0 GWh (block 4), totally 278.896 GWh, and 2778.249 GWh within a January - June 2006. The heat production in June 2006 was 38 212 GJ, and within a January - June 2006 it was produced 1 098 605 GJ of heat. Processing and storage of radioactive wastes in GovCo, a.s. - Decommissioning of Nuclear Installations and Spent Fuel and Rad-waste Management (VYZ) is presented. Thirty-two pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in January 2006. Sixteen fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 1132 pieces of fibre-concrete containers, which represent 15.72 per cent of storage capacity (7200 containers). The technique of SE-VYZ in decommissioning of A1 NPP is described

  4. The results of the surveillance specimen program performed in the RPVs NPP V-2 in Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L; Beno, P [Vyskumny Ustav Jadrovych Elektrarni, Trnava (Slovakia); Cepeek, S [Atomova Elektraren Bohunice, Jaslovske Bohunice (Slovakia); Tomasich, M [Slovak Nuclear Society, Bratislava (Slovakia)

    1994-12-31

    After a description of the mechanical and chemical characteristics of the materials (steels, welded joints) used in the pressure vessels of the WWER-440 V-213 type, the present status of the Bohunice NPP Unit 3 and 4 pressure vessel embrittlement assessment programme is presented: neutron flux monitoring and calculations, detector accuracy, irradiation temperature monitoring, reactor core fuel loading calculation, materials, number and types of surveillance specimens, specimen testing. Results are given for 5 years of irradiation: mechanical properties, transition temperatures, lifetime evaluation. 4 refs., 13 figs., 6 tabs.

  5. Experimental lysimetric device NPP A-1

    International Nuclear Information System (INIS)

    Matusek, I.; Plsko, J.

    2002-01-01

    In the frame of decommissioning of the NPP A-1 in the locality Jaslovske Bohunice the problem of remedial measures in scope of radioactive contaminated soils is also studied. These soils have originated in the area of the NPP A-1 by different mechanisms as the result of leakages from technology and in the present time they represent the secondary source of contamination of underground waters. Contaminated soils represent the particularity, because we can characterize them as voluminous radioactive contaminated residues with low-level or very low-level activity. EKOSUR Company in the frame of active underground water protection suggested more remedial measures. Two basic tasks are solved in the field of the contaminated soils: rehabilitation of contaminated soils or temporary immobilisation of radionuclides in the contaminated volumes, deposition of rehabilitated soils in the storage of landfill type. In the frame of engineering solution of the landfill storage the question of technology of own deposition of contaminated soils into storage area is important from the safety viewpoint. Therefore the Experimental lysimetric device was built for half-operational test of suggested technologies. This device contains 6 pieces of lysimeters with 6 active volumes of approximately 1 cubic meter. The aim of suggested and in the present time realised experiments is the practical modelling of influence of filtering of waters into storage of contaminated soils in configurational and qualitative different conditions of deposition of soils (for example exploitation of sorption materials). Also the structure of un-rehabilitated soils by the influence of natural downfalls activity is modelled in one lysimeter. In this issue the authors deal with the construction of lysimetric device, proposed experiments as like as gained results of observations. (authors)

  6. Radwaste Treatment Centre Jaslovske Bohunice

    International Nuclear Information System (INIS)

    2000-01-01

    In this leaflet the Bohunice Radwaste Treatment Centre (BSC RAO) is presented. BSC RAO is designed to process and treat liquid and solid radwaste, arising from the NPP A-1 decommissioning, from NPPs V-1, V-2, and Mochovce operations, as well as institutional radwaste of diverse institutional (hospitals, research institutes) in the Slovak Republic. Transport, sorting, incineration, compacting, concentration and cementation of radwaste as well as monitoring of emission are described

  7. Computer modelling the potential benefits of amines in NPP Bohunice secondary circuit

    International Nuclear Information System (INIS)

    Fountain, M.J.; Smiesko, I.

    1998-01-01

    The use of computer modelling of PWR and WWER secondary circuit chemistry was already demonstrated in the past. The model was used to illustrate the technical and economic advantages, compared with ammonia, of using an 'advanced', high basicity, low volatility amines to raise the liquid phase pH(T) in the moisture separator and other areas swept by wet steam. Since the 1995, this technique has been successfully applied to a number of power plants and the computer model has been progressively developed. This paper describes the preliminary results of an ongoing assessment being carried out for the VVER 440 plants at Bohunice. The work for Bohunice is being funded by the 'Know How Fund', a department in the British Government's Foreign and Commonwealth Office. (J.P.N.)

  8. The Modernization Program and Power Up-rate at NPP V2 Jaslovske Bohunice, Slovak Republic

    International Nuclear Information System (INIS)

    Reznik, Vladivoj; Krajmer, Imrich

    2010-01-01

    Slovenske Elektrarne, a.s. is a second largest utility company in the Central and Eastern Europe that owns an optimal production portfolio comprised of nuclear, thermal and hydroelectric power plants. There are two nuclear power plants Bohunice and Mochovce both operate with two units and another two units Mochovce 3 and 4 are currently under construction. Electricity at Nuclear power plant Bohunice V2 is generated by two 440 MW units that had gradually been connected to the power network over the period between 1984 and 1985. In the construction of the nuclear power plant V2 the concept of pressurized water reactors was adopted and the Soviet-era design WWER 440 used. The upgrading of Nuclear Power Plant Bohunice V2 is based on three main points: Modernization, Power up-rate, and Ageing monitoring program. The main targets of the modernization project were: Increasing of the Nuclear Safety and of the Nuclear operational reliability, and Seismic improvement. This modernization program is in full compliance with IAEA requirements and with the decisions from the Nuclear Regulatory Agency of the Slovak Republic (UJD) and achievement of the probabilistic safety criteria in accordance with IAEA recommendations. Except that is ensured a safe, reliable, economical and effective electricity and heat generation. Achieved results are based for further prolongation of the operation life time up to 60 years. (authors)

  9. Decommissioning of NPP A1 - HWGCR type

    International Nuclear Information System (INIS)

    Burclova, J.

    1998-01-01

    Prototype nuclear power plant A-1 located at Jaslovske Bohunice, was a HWGCR with channel type reactor KS 150 (refuelling during operation) and capacity of 143 MWe. Single unit has been constructed with reactor hall building containing reactor vessel, heavy water system and equipment for spent fuel handling. Another compartment of main building contents coolant system piping, six steam generators and six turbo compressors, the turbine hall was equipped by three turbines. Unit also shares liquid radwaste treatment and storage buildings and ventilation systems including chimney. It started operation in 1972 and was shutdown in 1977 after primary coolant system integrity accident. In 1979 a final decision was made to decommission this plant. The absence of waste treatment technologies and repository and not sufficient storage capacity affected the planning and realization of decommissioning for NPP A-1. The decommissioning policy for the first stage is for lack of regulations based on 'case by case' strategy. For these reasons and for not existence of Decommissioning Found until 1995 the preferred decommissioning option is based on differed decommissioning with safe enclosure of confinement. Transfer of undamaged spent fuel cooled in organic coolant to Russia was finished in 1990. It was necessary to develop new technology for the damaged fuel preparation for transport. The barriers check-up and dismantling of secondary circuit and cooling towers was performed during 1989/90. The complex plan for the first phase of A-1 decommissioning - the status with treated operational radwaste, removed contamination and restored treated waste and spent fuel (in case of interruption of transfer to Russia) was developed in 1993-1994. Under this project bituminization of all liquid operational radwaste (concentrates) was performed during 1995/96, vitrification of inorganic spent fuel coolant started at 1996, decontamination of spent fuel pool coolant occurs (under AEA Technology

  10. Selective Leaching of aerosol particles collected by cascade impactor in the ventilation stack of NPP V1 in Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Rulik, P; Beckova, V; Bucina, I; Foltanova, S; Poliak, R [National Radiation Protection Institute, Prague (Czech Republic)

    1996-12-31

    The study was apart of investigation of the size distribution of aerosol in air effluents from NPP V1 Jaslovske Bohunice. The evaluation the possible relationship between aerodynamic diameter of aerosol particles and chemical forms of radionuclides attached to the discharged aerosol was tried. Selective leaching was used for speciation of radionuclides present in the aerosol particles and for the estimation of their behaviour in the environment and absorption in gastro-intestinal tract. Activity concentrations of the radionuclides in the air, collected on collection substrates taken from individual impact stages and on back-up filter, were determined by sensitive gamma-spectrometric analysis using high purity Ge detectors. For the individual groups seven leaching steps were used. Following 12 radionuclides: silver-110m, cobalt-58, cobalt-60, cesium-134, cesium-137, manganese-54, ruthenium-103, antimony-124, antimony-125, tin-113, zinc-65, zirconium-95. Result shows that the leached fraction of the of the activity concentration does not depend on the size of the aerosol particles. (J.K.) 3 tabs., 3 figs.

  11. Accident localization system with jet condensers for VVER 440-V 230 NPP at Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Murani, J.

    1995-01-01

    The operational safety of the V1 nuclear power plant (NPP) is unsatisfactory and does not correspond to present requirements as to nuclear safety. Further NPP operation after 1995 is conditional on nuclear safety enhancement to a level comparable with that in West European countries. This aim should be achieved by a principal reconstruction involving in addition to others also backfitting the V1 NPP with technical facilities aimed at coping with a design basis accident (DBA).To cope with such an accident the Power Equipment Research Institute (VUEZ) designed an accident localization system with jet condensers. This system consists of (a) an air trap (one for each unit, mutually interconnected) with an expansion bell enclosed within, placed on a plate with 200 pipes of jet condensers passing through, and (b) a connecting duct between the hermetic zone and the air trap. The vertical jet condenser is an essential element of the system designed for steam condensation. Apart from condensation it serves as a water seal separating units 1 and 2.Demonstration tests of the jet condenser (model 1:1) condensing function were carried out at the testing unit of the All-Union Research Institute for NPP Operation (VNIIAES), Moscow in Kashir, 11-22 September 1992. These experiments proved the jet condenser ability to ensure complete condensation of the steam produced. Experimental verification of the sealing function (model 1:1) was carried out at the testing unit of the VUEZ Tlmace. These experiments concerning the dynamics and overpressure in the free space above the pool were close to the conditions in the air trap during DBA. The jet condenser height was proved to be sufficient to ensure the sealing function. Design and experimental work has been implemented in close cooperation with Russian experts Mr. V.N. Bulynin from the VNIIAES, Moscow, and Mr. M.V. Kuznecov from the Scientific and Engineering Center for Nuclear and Radiological Safety, Moscow. (orig.)

  12. Post-reconstruction full power and shut down level 2 PSA study for Unit 1 of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    Kovacs, Z.

    2003-01-01

    The level 2 PSA model of the J. Bohunice V1 NPP was developed in the RISK SPECTRUM Professional code with the following objectives: to identify the ways in which radioactive releases from the plant can occur following the core damage; to calculate the magnitudes and frequency of the release; to provide insights into the plant behaviour during a severe accident; to provide a framework for understanding containment failure modes; the impact of the phenomena that could occur during and following core damage and have the potential to challenge the integrity of the confinement; to support the severe accident management and development of SAMGs. The magnitudes of release categories are calculated using: the MAAP4/VVER for reactor operation and shutdown mode with closed reactor vessel and the MELCOR code for shutdown mode with open reactor vessel. In this paper an overview of the Level 2 PSA methodology; description of the confinement; the interface between the level 1 and 2 PSA and accident progression analyses are presented. An evaluation of the confinement failure modes and construction of the confinement event trees as well as definition of release categories, source term analysis and sensitivity analyses are also discussed. The presented results indicate that: 1)for the full power operation - there is an 25% probability that the confinement will successfully maintain its integrity and prevent an uncontrolled fission product release; the most likely mode of release from the confinement is a confinement bypass after SGTM with conditional probability of 30%; the conditional probability for the confinement isolation failure probability without spray is 5%, for early confinement failure at the vessel failure is 4%, for other categories 1% or less; 2) for the shutdown operating modes - the shutdown risk is high for the open reactor vessel and open confinement; important severe accident sequences exists for release categories: RC5.1, RC5.2 and RC6.2

  13. NPP A-1 decommissioning - Phase I

    International Nuclear Information System (INIS)

    Krstenik, A.; Blazek, J.

    2000-01-01

    Nuclear power plant A-1 with output 150 MW e , with metallic natural uranium fuelled, CO 2 cooled and heavy water moderated reactor had been prematurely finally shut down in 1977. It is necessary to mention that neither operator nor regulatory and other authorities have been prepared for the solution of such situation. During next two consecutive years after shutdown main effort of operator focused on technical and administrative activities which are described in the previous paper together with approach, condition and constraints for NPP A-1 decommissioning as well as the work and research carried out up to the development and approval of the Project for NPP A-1 decommissioning - I. phase. Subject of this paper is description of: (1) An approach to NPP A -1 decommissioning; (2) An approach to development of the project for NPP A-1 decommissioning; (3) Project - tasks, scope, objectives; (4) Mode of the Project realisation; (5) Progress achieved up to the 1999 year. (authors)

  14. Analytical and experimental verification of confinement upgrading for Bohunice NPP V1

    International Nuclear Information System (INIS)

    Tkac, A.

    2000-01-01

    The scope of this paper is to provide a brief description of confinement improvement for NPP V-1 and supporting thermal-hydraulic analyses and experimental results. Series of analyses are performed in the process of the designing of an improved confinement system. Based on the analytical results obtained in the PHARE Project NS01/91 'Confinement and Improved ECCS Evaluation' as well as on additional activities performed after its finishing, additional modifications have been proposed during the designing. It is required to minimize the construction works EWST ceiling, while final solution shall fulfil acceptance criteria set forth in Decision 1/94 of Slovak Regulatory Authority (UJD). The technical requirement of the UJD is related to confinement. IAEA recommendations are taken into account. Due to new definitions of DBA and BDBA first considerations were connected and oriented on possible value of pressure peak increasing. As a result of the structural analysis limiting values for hermetic zone are determined. Some design modifications of the hermetic zone are proposed

  15. Information letter 10. Information about operation of Jadrova vyradovacia spolocnost, a.s. and plants SE-NPP Bohunice during October 2006

    International Nuclear Information System (INIS)

    2006-11-01

    In this leaflet results of exploitation of four units of the Bohunice V1 and V2 NPPs are presented. The electricity and heat production in October 2006 are reviewed. Within a October 2006 the electricity was produced in NPP V1: 313.778 GWh (block 1), 209.838 GWh (block 2), totally 523.616 GWh, and 5125.651 GWh within a January - October 2006. Within a October 2006 the NPP V2: blocks 3 and 4 has worked on nominal power. Processing and storage of radioactive wastes in Jadrova vyradovacia spolocnost (JAVYS) is presented. Seventeen pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in October 2006. Thirty-eight fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 1234 pieces of fibre-concrete containers, which represent 17.14 percent of storage capacity (7200 containers)

  16. Information letter 12. Information about operation of Jadrova vyradovacia spolocnost, a.s. and plants SE-NPP Bohunice during December 2006

    International Nuclear Information System (INIS)

    2007-01-01

    In this leaflet results of exploitation of four units of the Bohunice V1 and V2 NPPs are presented. The electricity and heat production in December 2006 are reviewed. Within a December 2006 the electricity was produced in NPP V1: 301.221 GWh (block 1), 281.125 GWh (block 2), totally 582.346 GWh, and 6179.205 GWh within a January - December 2006. Within a November 2006 the NPP V2: the block 3 and block 4 has worked in stabile regime according to needs of regulation. Processing and storage of radioactive wastes in Jadrova vyradovacia spolocnost (JAVYS) is presented. Twenty pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in December 2006. Eight fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 1260 pieces of fibre-concrete containers, which represent 17.50 per cent of storage capacity (7200 containers)

  17. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  18. Information letter 2. Information about operation of plants SE-NPP Bohunice and SE-VYZ during February 2005

    International Nuclear Information System (INIS)

    2005-03-01

    In this leaflet results of exploitation of four units of the Bohunice V-1 and V-2 NPPs are presented. The electricity and heat production in February 2005 are reviewed. Within a February 2005 the electricity was produced: 217 GWh (block 1), 281 GWh (block 2), 277 GWh (block 3), 282 GWh (block 4), totally 1057 GWh, and 2271 GWh within a January - February 2005. The heat production in February 2005 was 266 506 GJ, and within a January - February 2005 it was produced 531 849 GJ of heat. On February 17 Slovak minister of economy Pavol Rusko and general director of ENEL Paolo Scaroni signed the agreement on acquisition of 66 per cent of Slovenske elektrarne (SE) by Italian ENEL for 840 million Eur. SE has capacity of around 7 GW (83 per cent of total Slovakian capacity). In 2004 SE generated 26 TWh of electricity. Processing and storage of radioactive wastes in Decommissioning of Nuclear Installations and Spent Fuel and Rad-waste Management (SE-VYZ) is presented. Since beginning of this year 58 fibre-concrete containers have been filled up in Bohunice processing centre of radioactive wastes. Twenty-three pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in February 2005. Twenty fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 830 pieces of fibre-concrete containers, which represent 11.53 per cent of storage capacity (7200 containers). Bohunice processing centre of radioactive wastes was put into active operation just before five years

  19. Information letter 3. Information about operation of plants SE-NPP Bohunice and SE-VYZ during March 2006

    International Nuclear Information System (INIS)

    2006-04-01

    In this leaflet results of exploitation of four units of the Bohunice V-1 and V-2 NPPs are presented. The electricity and heat production in March 2006 are reviewed. Within a March 2006 the electricity was produced: 294.020 GWh (block 1), 287.684 GWh (block 2), 292.636 GWh (block 3), 237.806 GWh (block 4), totally 1112 GWh, and 3330 GWh within a January - March 2005. The heat production in January 2006 was 253 057 GJ, and within a January - March 2006 it was produced 896 226 GJ of heat. Processing and storage of radioactive wastes in Decommissioning of Nuclear Installations and Spent Fuel and Rad-waste Management (SE-VYZ) is presented. Twenty-one pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in March 2006. Sixteen fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 1080 pieces of fibre-concrete containers, which represent 15.00 per cent of storage capacity (7200 containers). Celebration of ten years operation of SE-VYZ is described

  20. Information letter 1. Information about operation of plants SE-NPP Bohunice and SE-VYZ during January 2006

    International Nuclear Information System (INIS)

    2006-02-01

    In this leaflet results of exploitation of four units of the Bohunice V-1 and V-2 NPPs are presented. The electricity and heat production in January 2006 are reviewed. Within a January 2006 the electricity was produced: 249.149 GWh (block 1), 293.272 GWh (block 2), 305.479 GWh (block 3), 308.378 GWh (block 4), totally 1156 GWh. The heat production in January 2006 was 354 397 GJ. Processing and storage of radioactive wastes in Decommissioning of Nuclear Installations and Spent Fuel and Rad-waste Management (SE-VYZ) is presented. Twenty-two pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in January 2006. Sixteen fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 1048 pieces of fibre-concrete containers, which represent 14.55 per cent of storage capacity (7200 containers)

  1. Foreword by the director of Bohunice NPPs

    International Nuclear Information System (INIS)

    1998-01-01

    In this foreword the director briefly describes activities of the NPP Bohunice in 1997. Main activities were: electric and heat production , the V-1 NPP Gradual Reconstruction Programme, nuclear safety programmes, environment protection, international co-operation as well as national and international public information

  2. Experience with humidity monitoring and leak detection system SMU-V at the Jaslovske Bohunice V-1 NPP

    International Nuclear Information System (INIS)

    Macko, O.

    1996-01-01

    Within the paper a brief technical description of SMU-V system is presented including algorithms for measured data evaluation, assessment of experience acquired the system operation and prospective VUEZ activities aimed at the developed of systems for NPP primary circuit leak detection based on humidity monitoring. System SMU-V is used to diagnose dangerous conditions during which integrity of the pipeline could be impaired resulting in absolute humidity increase in the monitored volume. (author)

  3. Primary system hydraulic characteristics after modification of reactor coolant pumps' impeller wheels at Bohunice NPP executed in 2012 and 2013

    International Nuclear Information System (INIS)

    Hermansky, Jozef; Zavodsky, Martin

    2014-01-01

    A coolant flow through the reactor is usually determined after annual outages at Slovak NPP (VVER 440) in two distinct ways. First method is determination on the basis of the secondary system parameters - measurement of thermal balances. The value achieved by this method is used as the input parameter in the Table of allowed reactor operation modes. The second method draws from the primary system parameters - measurement of primary system hydraulic characteristics. Flow nozzles used for the measurement of feed water flow behind high pressure heaters were replaced at both Bohunice Units during outages in 2008. The feed water flow behind high pressure heaters is one of the main parameters used for the determination of coolant flow through the reactor by the first method. Compared to the measurement executed during previous fuel cycles, the calculated coolant flow through the reactor decreased considerably after the change of flow nozzles. The imaginary change of coolant flow through the reactor at Unit 3 was -1,6 %; and at Unit 4 -2,6 %. This change was not proved by the parallel measurement of primary system hydraulic characteristics. Later it was found out that the original flow nozzles used for 25 years were substantially deposited (original inner diameter of the nozzles was reduced by about 0,6-0,9 mm). Therefore feed water flow measurement was untrustworthy within the recent years. On the findings stated above, Bohunice NPP has decided to increase coolant flow through the reactor by changing the reactor coolant pumps impeller wheels. The modification of impellers wheels is planned within years 2012 to 2014. During the outages in 2013 two impeller wheels were replaced at both units. Nowadays Unit 4 is operated with all 6 new impeller wheels and Unit 3 with four new impeller wheels. Modification of last two impeller wheels at Unit 3 will be performed during the outage in 2014. On account of impeller wheels modification, non-standard measurement of PS hydraulic

  4. Bohunice V-1 and V-2 approach for achieving high availability, reliability and safety

    International Nuclear Information System (INIS)

    Lipar, M.; Kerak, J.; Rohar, S.

    1998-01-01

    Long term operating experience of Bohunice units maintenance activities are overviewed in the paper. Based on common experience of WWER NPP operators, separate maintenance department was established at Bohunice NPP in very early stage of plant operation. Maintenance management, maintenance planning, outage management, diagnostics and monitoring, inspection technologies and backfitting activities are described particularly to demonstrate the capability of Bohunice maintenance department for most complex repairs and maintenance works of nuclear power plant components and equipment, including reactor and turbine itself. (author)

  5. Forty years of atmospheric radiocarbon monitoring around Bohunice nuclear power plant, Slovakia

    International Nuclear Information System (INIS)

    Povinec, P.P.; Chudy, M.; Sivo, A.; Simon, J.; Holy, K.; Richtarikova, M.

    2009-01-01

    Radiocarbon variations in the atmospheric CO 2 with attenuating amplitudes and decreasing mean values with typical maxima in summer and minima in winter have been observed since 1967 in two localities of Slovakia, in Bratislava and Zlkovce, situated about 60 km NE from Bratislava, only 5 km from the Bohunice Nuclear Power Plant (NPP). The 14 C record in Bratislava has been influenced mainly by fossil CO 2 emissions, in contrast to the Zlkovce record which has been more variable, as it has clearly been affected by operation of the Bohunice NPP. However, during specific meteorological conditions with NE transport of air masses to Bratislava, the effect of the Bohunice NPP has been visible in Bratislava as well. Maximum 14 C concentrations (up to 120% above a natural background) were observed around A1 NPP which used CO 2 with admixture of air as a cooling agent. The 14 C concentrations around four pressurized light water reactors were up to 30% above the background. The Δ 14 C values in the heavily polluted atmosphere of Bratislava were up to 10% and at Zlkovce up to 5% lower than the European clean air represented by the Jungfraujoch Δ 14 C data. Later the Δ 14 C values were similar at both sites, and from 2003 they were close to the European clean air levels. The observed Δ 14 C behaviour in the atmosphere provides a unique evidence of decreased fossil fuel CO 2 emissions in the region, as well as the long-term effect of the Bohunice NPP on the Bratislava and Zlkovce stations. The estimated annual radiation doses to the local public due to digestion of radiocarbon contaminated food have been estimated to be around 3 μSv

  6. Development of decontamination technology for the decommissioned Bohunice A-1 nuclear power plant

    International Nuclear Information System (INIS)

    Krejci, F.; Majersky, D.; Solcanyi, M.; Sekely, S.; Kucharik, D.

    1991-01-01

    The main results of investigation into the decontamination technology for the equipment and buildings of the decommissioned A-1 nuclear power plant, achieved by the Nuclear Power Plants Research Institute in Trnava over the 1988-1990 period, are summarized. Mobile decontamination and recirculation equipment has been developed for pre-disassembling decontamination. A solution containing formic acid (19 g/l), EDTA-Na 4 (6 g/l) and thiourea (0.5 g/l) was used for decontamination of low-alloy steels; for materials from the steam generators and turbo-compressors, the decontamination factor (DF) of this solution was 30 to 150 per decontamination cycle. For high-alloy steels, a two-stage process comprising the use of an oxidation solution and a reduction solution appeared suitable. The oxidation solution contained potassium permanganate (0.6 g/l) and nitric acid (0.4 g/l), whereas the reduction solution, viz. Citrox 21, contained citric acid (0.5 g/l), oxalic acid (1.0 g/l) and EDTA-NA 4 (2.5 g/l). The DF is 10 to 50 in one oxidation-reduction cycle and 50-100 in two cycles. For the post-disassembling chemical decontamination, the contaminated material was cut into pieces 70 to 80 cm long, freed from grease and decontaminated chemically by submerging in the solution while applying treatment by ultrasound. A technology of electrochemical decontamination has also been developed. It appeared particularly suitable for structural materials of the primary coolant circuit comprising austenitic stainless steels and low-alloy steels after pre-disassembling chemical decontamination with remainders of the corrosion layer, and for structural materials of the secondary coolant circuit after chemical post-disassembling decontamination. Research in the field of decontamination of the building parts and of the outer surfaces of the structural materials concentrated mainly on the use of decontamination foams. Foaming solutions have been developed for the decontamination of PESL floors and

  7. Slovak power stations, Nuclear power plants Jaslovske Bohunice. (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. These activities are reported under the headings: (1) Foreword by the director of Bohunice NPPs; (2) Management of Bohunice NPPs Subsidiary Plant; (3) The most significant events of the year 1997; (4) Electricity and heat production; (5) Safety; (6) Bohunice NPPs operation impact on environment; (7) The V-1 NPP and V-2 NPP upgrading; (8) Maintenance; (9) Capital construction; (10) Economic balance; (11) International co-operation; (12) Human sources; (12) Public relations

  8. Implementation of the II. Stage decommissioning of A1 NPP

    International Nuclear Information System (INIS)

    Ficher, T.

    2015-01-01

    Presentation is focused on the implementation of the II. stage decommissioning of A1 NPP. Introductory part focuses on brief characteristics of the power plant with a history of operation, basic technical parameters and actions that were made after operation. The next section describes the basic schedule for decommissioning, structure of management and implementation of the II. stage decommissioning of the A1 NPP and objectives of the individual stages. The last and largest part of the presentation is devoted to detailed description of the II. stage decommissioning of the A1 NPP, its individual tasks and verbal and visual description of the activities that were performed. Presented is decommissioning of the technology and construction of external objects NPP A1 including storage tanks for liquid RAW, next are presented activities carried out in the Main Production Unit - decommissioning of non-operating technologies in various places/rooms, management of waste arising from these activities, treatment of case of A1 long-term spent fuel storage and long-term spent fuel storage. The subsequent section is devoted to the management and handling of contaminated soil, concrete and construction waste, including management of VLLW. (authors)

  9. Decommissioning of the NPP A-1 heavy water management system

    International Nuclear Information System (INIS)

    Medved, J.; Rezbarik, J.; Vargovcik, L.; Vykukel, I.

    2015-01-01

    The paper deals with experience and techniques in the application of decontamination technology and remotely controlled robotic devices for the decontamination and dismantling of the heavy water management system during undergoing decommissioning process of the A-1 NPP as well as treatment of arising liquid waste All of these activities are characterized by high level of radioactivity and contamination. (authors)

  10. Radiological characterisation of contaminated concretes from the object 44/20 of NPP A1

    International Nuclear Information System (INIS)

    Slavik, O.; Listjak, M.; Pely, I.; Soos, F.

    2005-01-01

    Results of radiological characterisation of contaminated concretes from object 44/20 of the NPP A-1 Jaslovske Bohunice are summarized in this work. These works were carried out in VUJE in the laboratory of environmental dosimetry in 2004 and partially in 2005. The main results of radiological characterisation can be summarised as follow: (1) Contamination of concretes is in all cases surficial, it reaches up to 5-10 mm, the dominant contaminant is 137 Cs; (2) The spawn concrete is mostly contaminated only from one side (one being adjacent to the ceiling concrete), crucial part of them is even on this side contaminated in very low level complying with free release level; (3) The ceiling concrete blocks are contaminated mostly on one side, only (the inner side of shafts), their decontamination will require removing of about 5 mm thick surface layer. (4) The floor concrete is covered by heavily contaminated dust 137 CS, 100-500 Bq/g), originating from sorting of the wet RAW .Its decontamination will require removing of 10 mm thick surface concrete layer; (5) The core samples taken from the whole depth profile of the ceiling concrete show also only surface contamination, samples prepared from the deeper layers have not demonstrated any contamination in these layers. Control measurements of deeper concrete layers, however, went on with negative results also in year 2005; (6) The relative content for 90 Sr in these concretes is in average about 8%, for 241 Am determined by gamma-spectrometry is 0.4% and for 239 , 240 Pu determined radiochemically is 0.33% in comparison with the content of 137 Cs. (authors)

  11. Monitoring of primary circuit and reactor of NPP A-1

    International Nuclear Information System (INIS)

    Prazska, M.; Majersky, M.; Rezbarik, J.; Sekely, S.; Vozarik, P.; Walthery, R.; Stuller, P.

    2005-01-01

    Nuclear Power Plant A-1 in Jaslovske Bohunice was commissioned in 1972. Heavy water moderated, carbon dioxide cooled channel type reactor was shut down after two accidents in 1977. During more serious second accident, the reduced coolant flow caused local overheating of the fuel and consequent damage/melting of the fuel channel. Both accidents had led to the damage of several fuel assemblies with extensive local damage of fuel claddings. As a consequence, the main cooling circuit was significantly contaminated by fission products and long-life alpha nuclides. The detailed monitoring of dose rates, smearable contamination and sampling of contamination was performed. Extended monitoring in reacto vessel, primary circuit pipes, turbo-compressors, steam generators, main valves, gas tanks and also heavy water system with collectors, coolers, distilling and purification station, pumps and valves was done. Appropriate devices and procedures for the monitoring and examination of the installations were prepared and applied. Obtained results will serve for the future planning of the decontamination and decommissioning works. The 3-D model of the reactor that had been developed as part of this Project proved invaluable for orientation, visualisation, planning and analysis of results. Dose rates were measured in the technological channels from the reactor hall floor to the bottom of the hot gas chamber in decrements of 1 m and 0.5 m. The highest absolute values of dose rates were found in channels located in the middle of the reactor (up to 1900 mGy/h in the active zone region). It is estimated that the total contaminated area of primary circuit equipment (pipework, steam generators and turbo-compressors) is some 48 000 m 2 . It follows that the total gamma contamination is of the order of 10 14 to 10 15 Bq and total alpha contamination 10 11 to 10 13 Bq. The total amount of deposits in the gas circuit is about 14.3 tons. (authors)

  12. Redevelopment drawing off of underground waters - a tool for lowering of environmental influences of the decommissioned A-1 NPP on the environment

    International Nuclear Information System (INIS)

    Kostolansky, M.; Benko, J.; Plsko, J.; Machyniak, P.

    2003-01-01

    Decommissioned A-1 NPP is the main source of radioactive contamination of the underground waters in the locality of nuclear energetic facilities in Jaslovske Bohunice. This situation is the consequence of historical as well as present leaks of the radioactive contamination into geological surroundings of the locality. The tritium is the determining radionuclide. The remedial measures were accepted for solution of this negative influence on the environment. The aim of these measures was the minimisation of influence of the underground waters. One of instruments, which supply the decreasing of environmental influence of the decommissioned A-1 NPP on underground waters, is the also redevelopment drawing off of underground waters. In this paper is briefly said the process of planning of the optimal technology and of the parameters of redevelopment drawing off of underground waters in the area of the A-1 NPP and its realisation. The main part of the paper is dedicated to the evaluation of results of realisation of the redevelopment drawing off of underground waters and to the total evaluation of this measure for assigning of protection of underground waters, their resources and right function of water divisions of this locality in the meaning of applicable legislation. (authors)

  13. Information about environmental effects of Bohunice NPPs V-1 and V-2 within February 2002

    International Nuclear Information System (INIS)

    2002-01-01

    In this leaflet the results of monitoring of chemical gaseous and liquid effluents into the rivers Vah and Dudvah as well as of radiation monitoring of Bohunice V-1 and V-2 NPPs are presented. The radioactive effluents within a February 2002 (for NPP V-1 and NPP V-2, respectively) were: 0.571 TBq and 0.664 TBq of rare gases, 0.711 MBq and 0.244 MBq of aero-soles, 2.121 MBq and 0.138 MBq of iodine, 2.022 MBq and 0.564 MBq of corrosive and fission products, and 1.420 TBq and 1.643 TBq of tritium. For the period January - February 2002 these radioactive effluents represent for rare gases 1.286 TBq for NPP V-1 and 1.475 TBq for NPP V-2 (2.761 TBq (0.069% of annually limit (AL) for the locality Bohunice), for aerosols 2.645 MBq for NPP V-1 and 0.542 MBq for NPP V-2 (3.187 MBq (0.002% of AL for the locality Bohunice), for corrosive and fission products 3.848 MBq for NPP V-1 and 1.510 MBq for NPP V-2 (5.358 MBq (0.01% of AL) for the locality Bohunice), and for iodine 2.616 MBq for NPP V-1 and 0.279 MBq (2.894 MBq (0.002% of AL) for the locality Bohunice), and for tritium it is 2.395 TBq for NPP V-1 and 3.532 TBq for NPP V-2 (5.358 TBq (13.56% of AL) for the locality Bohunice

  14. Management of very low level waste from decommissioning of the A-1 Jaslovske Bohunice nuclear power plant in Slovakia

    International Nuclear Information System (INIS)

    Burclova, J.; Konecny, L.; Mrskova, A.

    2000-01-01

    Efforts were made to accelerate decommissioning, particularly of the nuclear power plant A1 of the HWGCR type. Progress made and current developments in this subject area are reviewed. Radioactive waste categories are described along with release criteria. An overview is provided on contaminated scrap and the sorting of contaminated soil and concrete. (author)

  15. Monitoring program of surrounding of the NPP SE-EBO

    International Nuclear Information System (INIS)

    Dobis, L.; Kostial, J.

    1997-01-01

    The paper dealt with monitoring program of radiation control of surrounding of the NPP Bohunice, which has the aim: (1) to ensure the control of influence of work of the NPP Bohunice on the environment in their surrounding; (2) to ensure the back-ground for regular brief of control and supervisory organs about condition of the environment in surrounding of the NPP Bohunice; (3) to maintain the expected technical level of control of the NPP Bohunice and to exploit optimally the technical means; (4) to solicit permanently the data about the radioactivity of environment in surrounding of the NPP Bohunice for forming of files of the data; (5) to exploit purposefully the technical equipment, technical workers and to maintain their in permanent emergency and technical eligibility for the case of the breakdown; (6) to obtain permanently the files of the values for qualification of the reference levels. This program of monitoring includes the radiation control of surrounding of the NPP Bohunice, in the time of normal work of power-station's blocks, inclusively of all types of trouble-shooting and repairer works in surrounding of the NPP Bohunice, up to distance 20 km from power-station. The monitoring includes: outlets from the NPP Bohunice, monitoring of radiation characteristics in surrounding of the NPP Bohunice, (aerosols, fall-outs, soil), the links of food chains: (grass and fodder, milk, agriculture products), hydrosphere in surrounding (surface waters, drink water, bores of radiation control in complex of the NPP Bohunice, components of the hydrosphere), measurement of radiation from external sources (measurement of the dose rates, measurement of the doses [sk

  16. Recent events at Bohunice NPP Slovak Republic

    International Nuclear Information System (INIS)

    Lipar, M.

    1996-01-01

    During a filter regeneration in the steam generators (SG) blow down purification system at full power, approximately 900 litres of NaOH penetrated through a condensate collection tank into the main turbine condenser and subsequently into three SGs. The penetration occurred because of a valve left open during the filter regeneration due to a valve configuration error. The water in the tree SGs foamed, causing unexpected behaviour in SG level indicators which led to a reactor scram. By exceeding the pH value of feedwater for 7 minutes, the technical specification were violated, until the unit was brought into hot shut-down mode. Figs

  17. Operation diagnostics of the reactor coolant pumps in the Jaslovske Bohunice nuclear power plant, CSSR

    International Nuclear Information System (INIS)

    Bahna, J.; Jaros, I.; Oksa, G.

    1990-01-01

    The state of the art of the materials basis, the diagnostics methods used, organization of data collection and processing, and some results of routine and specific investigations concerned with diagnosis of the reactor coolant pump in the Jaslovske Bohunice NPP V-1 are presented. Some information is given about the reactor coolant pump monitor developed in the VUJE. (author)

  18. Eco information 9. Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, locality of Bohunice, within September 2014

    International Nuclear Information System (INIS)

    2014-10-01

    In this leaflet the results of monitoring of chemical gaseous and liquid effluents into the rivers Vah and Dudvah as well as of radiation monitoring of Bohunice V1 NPP, Interim Spent Fuel Storage (MSVP), Bohunice Radioactive Waste Processing Centre (VK808 - BSC), The Main Production Unit (VK 46A - HVB) and Bitumenation Lines (VK 46B - BL) are presented. The radioactive effluents into atmosphere within January - September 2014 (for NPP V1, MSVP, BSC, HVB and BL, respectively) were: 1.483 MBq (0.002 of AL) for V1, 0.087 MBq (0.029% of AL) for MSVP, 0.084 MBq (0.060% of AL) for BSC, 0.400 MBq (0.061% of AL) for HVB and 0.028 MBq (0.020% of AL) for BL of aero-soles. The radioactive effluents into atmosphere and hydrosphere within a September 2014 for NPP V1, MSVP, and VK 808 BSC, respectively, were: 0.258 MBq (V1), 0.007 MBq (VK MSVP), 0.018 MBq (VK 808 BSC), 0.005 MBq (VK 46A) and 0.002 MBq (VK 46B) of aero-soles into atmosphere; 1.169 MBq (V1 and MSVP) and 0.522 MBq (TSU RAO and NPP A1) of corrosive and fission products, and 0.002 GBq (V1 and MSVP) and 16.740 GBq (TSU RAO and NPP A1) of tritium into the Vah River and 0.000 GBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) of corrosive and fission products and 0.000 GBq of tritium (V1) and 0.000 GBq of tritium (TSU RAO and NPP A1) into the Dudvah River). For the period January - September 2014 these radioactive effluents into recipient of Vah River represent for corrosive and fission products 12.402 MBq (0.095% of AL for V1 and MSVP) and 5.010 MBq (0.042% of AL for TSU RAO and MSVP); and for tritium it is 8.382 GBq (0.419% of AL) for V1 and MSVP, and 98.415 GBq (0.984% of AL) for TSU RAO and NPP A1 (into the Vah River) and for corrosive and fission products 0.000 MBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) (0.0000 of AL) of tritium (into the Dudvah River). Chemical effluents are reported, too.

  19. Eco information 1. Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, locality of Bohunice, within January 2016

    International Nuclear Information System (INIS)

    2016-02-01

    In this leaflet the results of monitoring of chemical gaseous and liquid effluents into the rivers Vah and Dudvah as well as of radiation monitoring of Bohunice V1 NPP, Interim Spent Fuel Storage (MSVP), Bohunice Radioactive Waste Processing Centre (VK808 - BSC), The Main Production Unit (VK 46A - HVB) and Bitumenation Lines (VK 46B - BL) are presented. The alpha radioactive effluents into atmosphere within January 2016 (for NPP V1, MSVP, BSC, HVB and BL, respectively) were: 0.051 MBq (0.0001 of AL) for V1, 0.006 MBq (0.002% of AL) for MSVP, 0.007 MBq (0.005% of AL) for BSC, 0.027 MBq (0.004% of AL) for HVB and 0.003 MBq (0.002% of AL) for BL of aero-soles. The radioactive effluents into atmosphere and hydrosphere within a January 2016 for NPP V1, MSVP, and VK 808 BSC, respectively, were: 0.051 MBq (V1), 0.006 MBq (VK MSVP), 0.007 MBq (VK 808 BSC), 0.027 MBq (VK 46A) and 0.003 MBq (VK 46B) of aero-soles into atmosphere; 0.192 MBq (V1 and MSVP) and 0.346 MBq (TSU RAO and NPP A1) of corrosive and fission products, and 0.001 GBq (V1 and MSVP) and 10.991 GBq (TSU RAO and NPP A1) of tritium into the Vah River and 0.000 GBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) of corrosive and fission products and 0.000 GBq of tritium (V1) and 0.000 GBq of tritium (TSU RAO and NPP A1) into the Dudvah River). For the period January - January 2016 these radioactive effluents into recipient of Vah River represent for corrosive and fission products 0.192 MBq (0.0015% of AL for V1 and MSVP) and 0.346 MBq (0.003% of AL for TSU RAO and MSVP); and for tritium it is 0.001 GBq (0.00003% of AL) for V1 and MSVP, and 10.991 GBq (0.110% of AL) for TSU RAO and NPP A1 (into the Vah River) and for corrosive and fission products 0.000 MBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) (0.0000 of AL) of tritium (into the Dudvah River). Chemical effluents are reported, too.

  20. Eco information 4 Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, locality of Bohunice, within April 2016

    International Nuclear Information System (INIS)

    2016-05-01

    In this leaflet the results of monitoring of chemical gaseous and liquid effluents into the rivers Vah and Dudvah as well as of radiation monitoring of Bohunice V1 NPP, Interim Spent Fuel Storage (MSVP), Bohunice Radioactive Waste Processing Centre (VK808 - BSC), The Main Production Unit (VK 46A - HVB) and Bitumenation Lines (VK 46B - BL) are presented. The alpha radioactive effluents into atmosphere within January - April 2016 (for NPP V1, MSVP, BSC, HVB and BL, respectively) were: 0.141 MBq (0.0002 of AL) for V1, 0.027 MBq (0.006% of AL) for MSVP, 0.029 MBq (0.016% of AL) for BSC, 0.127 MBq (0.015% of AL) for HVB and 0.009 MBq (0.006% of AL) for BL of aero-soles. The radioactive effluents into atmosphere and hydrosphere within a April 2016 for NPP V1, MSVP, and VK 808 BSC, respectively, were: 0.017 MBq (V1), 0.008 MBq (VK MSVP), 0.006 MBq (VK 808 BSC), 0.029 MBq (VK 46A) and 0.003 MBq (VK 46B) of aero-soles into atmosphere; 0.880 MBq (V1 and MSVP) and 0.397 MBq (TSU RAO and NPP A1) of corrosive and fission products, and 0.315 GBq (V1 and MSVP) and 7.163 GBq (TSU RAO and NPP A1) of tritium into the Vah River and 0.000 GBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) of corrosive and fission products and 0.000 GBq of tritium (V1) and 0.000 GBq of tritium (TSU RAO and NPP A1) into the Dudvah River). For the period January - April 2016 these radioactive effluents into recipient of Vah River represent for corrosive and fission products 2.658 MBq (0.0204% of AL for V1 and MSVP) and 1.744 MBq (0.015% of AL for TSU RAO and MSVP); and for tritium it is 0.736 GBq (0.03679% of AL) for V1 and MSVP, and 31.833 GBq (0.318% of AL) for TSU RAO and NPP A1 (into the Vah River) and for corrosive and fission products 0.000 MBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) (0.0000 of AL) of tritium (into the Dudvah River). Chemical effluents are reported, too.

  1. Eco information 2. Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, locality of Bohunice, within February 2016

    International Nuclear Information System (INIS)

    2016-03-01

    In this leaflet the results of monitoring of chemical gaseous and liquid effluents into the rivers Vah and Dudvah as well as of radiation monitoring of Bohunice V1 NPP, Interim Spent Fuel Storage (MSVP), Bohunice Radioactive Waste Processing Centre (VK808 - BSC), The Main Production Unit (VK 46A - HVB) and Bitumenation Lines (VK 46B - BL) are presented. The alpha radioactive effluents into atmosphere within January - February 2016 (for NPP V1, MSVP, BSC, HVB and BL, respectively) were: 0.100 MBq (0.001 of AL) for V1, 0.013 MBq (0.004% of AL) for MSVP, 0.017 MBq (0.012% of AL) for BSC, 0.048 MBq (0.007% of AL) for HVB and 0.005 MBq (0.003% of AL) for BL of aero-soles. The radioactive effluents into atmosphere and hydrosphere within a February 2016 for NPP V1, MSVP, and VK 808 BSC, respectively, were: 0.049 MBq (V1), 0.007 MBq (VK MSVP), 0.011 MBq (VK 808 BSC), 0.020 MBq (VK 46A) and 0.002 MBq (VK 46B) of aero-soles into atmosphere; 0.706 MBq (V1 and MSVP) and 0.738 MBq (TSU RAO and NPP A1) of corrosive and fission products, and 0.419 GBq (V1 and MSVP) and 7.479 GBq (TSU RAO and NPP A1) of tritium into the Vah River and 0.000 GBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) of corrosive and fission products and 0.000 GBq of tritium (V1) and 0.000 GBq of tritium (TSU RAO and NPP A1) into the Dudvah River). For the period January - February 2016 these radioactive effluents into recipient of Vah River represent for corrosive and fission products 0.898 MBq (0.0069% of AL for V1 and MSVP) and 1.084 MBq (0.009% of AL for TSU RAO and MSVP); and for tritium it is 0.420 GBq (0.02098% of AL) for V1 and MSVP, and 18.470 GBq (0.185% of AL) for TSU RAO and NPP A1 (into the Vah River) and for corrosive and fission products 0.000 MBq (V1 and MSVP) and 0.000 MBq (TSU RAO and NPP A1) (0.0000 of AL) of tritium (into the Dudvah River). Chemical effluents are reported, too.

  2. Internal communication at Bohunice NPPs

    International Nuclear Information System (INIS)

    Dobdk, Dobroslav

    1999-01-01

    Communication is the base of everyday existence of a modern person and every company. It is not easy to work in this area in a changing 'eastern' country. Many tools, which are used are in the mind of people connected with 'propaganda'. I would like to share our experience with you. The goal of an internal communication is to spread and provide continuous current of objective information between the management of Bohunice NPPs and its personnel and between the personnel itself. Communication with the Bohunice NPPs employees helps to get acquainted with their opinions and ideas concerning the subsidiary and nuclear power industry

  3. ALARA radiation protection applications at NPP A1 decommissioning using VISPLAN planning tool

    International Nuclear Information System (INIS)

    Slavik, O.; Kucharova, D.; Listjak, M.

    2005-01-01

    The SCK.CEN developed during the BR3 reactor decommissioning a graphical interfaced 3D dose assessment tool aimed at the above mentioned dose optimization problems. The tool was improved further and commercialized under the name VISIPLAN 3D ALARA planning tool. The use of VISIPLAN tool at NPP A1 decommissioning was advised by EDF within the IAEA TCP SLR/4008 project missions as a component of a 3D technological chain ensuring acquisition and evaluation of digitized information leading to ALARA optimisation of the developed decommissioning working procedures (see Fig. 1). VISIPLAN license was purchased by IAEA and granted to VUJE and NPP A1 within the IAEA TCP project SLR/4008, covering also the necessary basic and advanced training (at NPP A1 real decommissioning environment), and is currently used by VUJE analysts at NPP A1 decommissioning as an ALARA tool for intervention planning and optimisation. The VISIPLAN allows a fast dose assessment for work planned in a radioactive environment. The calculations are based on a 3D model of the work place. This PC-based tool is user friendly and calculates a detailed dose account for different work scenarios defined by the ALARA analyst, taking into account worker position, work duration and subsequent geometry and source distribution changes. The VISIPLAN methodology is described. The VISIPLAN tool was applied to several ALARA studies carried out by the VUJE within development and analysis of various Work Programs for NPP Al decommissioning tasks. The applications ranged from simpler to complex ALARA planning tasks covering simple shielding applications to selection of the most suitable order of complex working procedures. Removal of inner liners from underground reservoirs 6/1 and 6/2 as well as Dismantling of pipes and components from a (hostile) 60 m corridor are described. (authors)

  4. Bohunice V-1. Review of safety upgrading and operating experiences

    International Nuclear Information System (INIS)

    Korec, J.; Kuschel, D.

    2000-01-01

    The Bohunice site in the Slovak Republic has two Russian-designed twin-unit nuclear power plants, one equipped with reactors of the WWER 440/230 type, the other with type WWER 440/213 reactors. Two older units (V-1) started commercial operation in late 1978 and 1980 respectively and have been supplying electricity to the national grid since that time without any events that could have degraded plant safety level. In the period prior to 1990 the utility Slovenske Elektrarne (S.E.) performed extensive modifications and upgrades to the original design of the two older units V-1 NPP. Furthermore, significant steps in safety improvement for Bohunice NPP V-1 have been made since 1990. Following the political restructuring of the former Czechoslovakia and the country's new open-door policy towards western organizations, several international expert missions were focused on evaluation of Bohunice NPP safety status level and operational reliability, particularly targeting the two older units. Based on recommendations of individual expert missions and complementary deterministic and probabilistic safety analyses performed by S.E., the Czechoslovak Nuclear Regulatory Authority issued the Resolution No. 5/91 defining 81 measures concerning further safety and reliability improvement of Bohunice V1 .A range of short-term and long-term upgrades was prioritised in terms of importance to plant safety and work to implement these measures commenced in the early nineties. During the 'Small Reconstruction' from 1991 to 1993 some of the short term upgrading measures were realized to eliminate the most serious safety deficits, thus to achieve a significant reduction in core damage frequency and a major improvement in confinement integrity. In this paper and presentation the goals of the gradual reconstruction project, basic engineering, detailed engineering and realization, last major stage of Unit 2 upgrade, as well as final stage of Unit 1 upgrade in early 2000 are presented

  5. Rapid separation and determination of 107Pd in radioactive waste produced during NPP A-1 decommissioning

    International Nuclear Information System (INIS)

    Boris Andris; Miroslav Prazsky; Ferdinand Sebesta

    2015-01-01

    Procedure for 107 Pd determination in radioactive wastes coming from decommissioning of NPP A-1 is proposed and verified. 107 Pd was separated and purified by Pd precipitation with dimethylglyoxime (DMG) and/or ferric hydroxide precipitation. 107 Pd yield was determined gravimetrically by weighing the Pd(DMG) 2 precipitate. 107 Pd counting was performed using liquid scintillation counter (LSC-TDCR) and scintillation cocktail Hionic Fluor. In all analyzed samples the determined activities of 107 Pd were lower than MDA. Nevertheless such analyses permit the decision concerning the storage of solidified wastes in the Mochovce regional repository. (author)

  6. The NPPR Trnava participation in the NPP V-2 modernisation and safety improvement project

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    1999-01-01

    The presented contribution deals with form, present state and results of Nuclear Power Plants Research Inst.e participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project.(author)

  7. NPP Mochovce - a project of extraordinay significance

    International Nuclear Information System (INIS)

    Chwolik, I.; Debru, M.

    2000-01-01

    In this paper and in this presentation the reactor safety upgrading of two blocks of the NPP V-1 Bohunice, some results of participation on safety upgrading by the German-French consortium EUCOM (Framatome and Siemens-KWU) are presented. (author)

  8. Pilot exemption of the controlled area from regulatory control at NPP A1 -lessons learned

    International Nuclear Information System (INIS)

    Slaninka, A.; Listjak, M.; Slavik, O.; Rau, L.

    2014-01-01

    The contribution includes the lessons learned within frame of the radiological characterisation of surface ground layer in the NPP A1 site of area approximately 60 m2 (9 x 7 m) that was a part of Controlled area. Aim of the characterisation was a demonstration that the area fulfils the requirements to exemption from Controlled area for purpose of decommissioning activities carry out within frame of II. stage of NPP A1 decommissioning project.The requirements on free release of materials into the environment were applied (e.g. 300 Bq/kg for single 137 Cs). Radiological characterisation was performed by two independent methods; in situ scintillation gamma spectrometry and systematic sampling in regular grid followed by gamma spectrometry analyses in accredited laboratory of VUJE, Inc. (S-219). This improved the quality of monitoring and at the same time it enabled the inter-comparison of results obtained by both mentioned independent methods.Characterised ground area was partitioned to smaller sub-areas of 4 m2. At ground layer of 20 cm it means approximately 1000 kg of ground (in compliance with requirements on reference area at even activity distribution according to government regulation No 345/2006) The results of measurements showed that under appropriate conditions (sufficiently low radiation background, on interfering external sources) also the designed in situ method is effective and reliable tool for contaminated ground layer identification. In addition the in situ method is more effective in terms of time and cost consumption on unit of monitored area. (authors)

  9. REKO - Bohunice V-1. Experience with instrumentation and control system

    International Nuclear Information System (INIS)

    Arbet, L.; Ziska, D.; Golan, P.; Karaba, P.; Krupa, S.; Wiening, K.-H.

    2000-01-01

    In this paper and in presentation some results of upgrading of the NPP Bohunice V-1 are presented. For the first time, extensive upgrades are performed in all safety-related areas of both units with VVER 440/230 reactors. These upgrades focused on: - Expansion and upgrading of the process safety systems; - Replacement of the safety I and C system with a TELEPERM XS-based system; - Spatial separation of safety equipment; - Modernisation of the electrical auxiliary power systems; - Seismic upgrading and fire protection; - Improvement of the man-machine interface. This upgrade is considered exemplary around the world. The most extensive stage of gradual reconstruction of Unit 2 was completed according to the schedule in January 1999. For the first time, a reactor which incorporates state-of-the-art digital I and C in its reactor protection system is on-line. (author)

  10. Bohunice Simulator Data Collection Project

    International Nuclear Information System (INIS)

    Cillik, Ivan; Prochaska, Jan

    2002-01-01

    The paper describes the way and results of human reliability data analysis collected as a part of the Bohunice Simulator Data Collection Project (BSDCP), which was performed by VUJE Trnava, Inc. with funding support from the U.S. DOE, National Nuclear Security Administration. The goal of the project was to create a methodology for simulator data collection and analysis to support activities in probabilistic safety assessment (PSA) and human reliability assessment for Jaslovske Bohunice nuclear power plant consisting of two sets of twin units: two VVER 440/V-230 (V1) and two VVER 440/V-213 (V2) reactors. During the project training of V-2 control room crews was performed at VUJE-Trnava simulator. The simulator training and the data collection were done in parallel. The main goal of BSDCP was to collect suitable data of human errors under simulated conditions requiring the use of symptom-based emergency operating procedures (SBEOPs). The subjects of the data collection were scenario progress time data, operator errors, and real-time technological parameters. The paper contains three main parts. The first part presents preparatory work and semi-automatic computer-based methods used to collect data and to check technological parameters in order to find hidden errors of operators, to be able to retrace the course of each scenario for purposes of further analysis, and to document the whole training process. The first part gives also an overview of collected data scope, human error taxonomy, and state classifications for SBEOP instructions coding. The second part describes analytical work undertaken to describe time distribution necessary for execution of various kinds of instructions performed by operators according to the classification for coding of SBEOP instructions. It also presents the methods used for determination of probability distribution for different operator errors. Results from the data evaluation are presented in the last part of the paper. An overview of

  11. Bohunice Simulator Data Collection Project

    International Nuclear Information System (INIS)

    Cillik, I.; Prochaska, J.

    2002-01-01

    The paper describes the way and results of human reliability data analysis collected as a part of the Bohunice Simulator Data Collection Project (BSDCP), which was performed by VUJE Trnava, Inc. with funding support from the U.S. DOE, National Nuclear Security Administration. The goal of the project was to create a methodology for simulator data collection and analysis to support activities in probabilistic safety assessment (PSA) and human reliability assessment for Jaslovske Bohunice nuclear power plant consisting of two sets of twin units: two VVER 440/V-230 (V1) and two VVER 440/V-213 (V2) reactors. During the project, training of V-2 control room crews was performed at VUJE Trnava simulator. The simulator training and the data collection were done in parallel. The main goal of BSDCP was to collect suitable data of human errors under simulated conditions requiring the use of symptom-based emergency operating procedures (SBEOPs). The subjects of the data collection were scenario progress time data, operator errors, and real-time technological parameters. The paper contains three main parts. The first part presents preparatory work and semi-automatic computer-based methods used to collect data and to check technological parameters in order to find hidden errors of operators, to be able to retrace the course of each scenario for purposes of further analysis, and to document the whole training process. The first part gives also an overview of collected data scope, human error taxonomy, and state classifications for SBEOP instructions coding. The second part describes analytical work undertaken to describe time distribution necessary for execution of various kinds of instructions performed by operators according to the classification for coding of SBEOP instructions. It also presents the methods used for determination of probability distribution for various operator errors. Results from the data evaluation are presented in the last part of the paper. An overview of

  12. New free-release and sorting monitors developed for NPP A-1 decommissioning, Slovakia - 59071

    International Nuclear Information System (INIS)

    Slavik, Ondrej; Listjak, Martin; Kravar, Kamil; Slaninka, Alojz; Pely, Igor

    2012-01-01

    A pilot free-release monitoring post with a 600 L container monitor was developed and metrological tested within the 2. stage of NPP A1 decommissioning project. In order to reduce the volume of contaminated soil monitoring a conceptual design of fast sorting loader shovel monitor (loader's spoon) was proposed and tested within the project as well. The free-release monitoring post makes use of a pair of electrically cooled lead shielded semiconductor detectors placed into a mounting rack ensuring measurements in either horizontal (container monitoring) or vertical (drum monitoring) counting geometry. For evaluation of measured HPGe spectra the Canberra -Packard ISOCS detection efficiency calculation code was used. A loader is used to change the measured side of the 600 L container. For metrological certification of this monitor a special prototype test container with 24 rod sources inside a regular grid was necessary to design and to use. The mentioned above vertical counting geometry together with an additional drum rotator ensures standard free release monitoring of materials in 200 l rotating drums. Successful metrological qualification of the both counting geometries at SMU Bratislava showed 20 % accuracy class. A pair of NaI(Tl) detectors and a measurement and navigation frame ensuring loader shovel fixation in counting position are used for the fast sorting monitoring. The navigation of loader and its shovel to the counting geometry should be as fast as possible. The monitored results shall be indicated by a prompt light indication system (apart from storing on HDD). MCNP 5 calculation code was used for assessment of gross gamma 137 Cs detection efficiency. The estimated MDA for a pair of 2'' x 2'' Na(Tl) detectors and 30 s acquisition time is about 90 Bq/kg. However, due to the counting geometry deviations from calculated values the uncertainty of measurements can be relatively high. Hence, the system is applicable for sorting monitoring only. (authors)

  13. Slovak Electric, plc, Bohunice Nuclear Power Plant

    International Nuclear Information System (INIS)

    1999-01-01

    A brief account of activities carried out by the Bohunice Nuclear Power Plant in 1998 is presented. These activities are reported under the headings: (1) Operation and electric power generation; (2) Nuclear and radiation safety; (3) Maintenance and scheduled refuelling out-gages; (4) Investment and WWER units upgrading; (5) Power Plants Personnel; (6) Public relations

  14. Lessons learned from the decommissioning process affected by an accident during operation. The case of A1 NPP in Slovakia

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Timulak, Jan; Pekar, Anton; Niznansky, Vojtech; Konecny, Ladislav

    2007-01-01

    Decommissioning of NPP's with standard shutdown is currently well known process. The A1 NPP in Slovakia was shutdown in 1977 after the accident in the core which caused the damage of the fuel and contamination of systems. Long period from 1977 to 2008 was needed to manage issues resulting from affecting the systems and structures of A1 NPP and the environment by the accident. Management of the damaged spent fuel, decontamination of the primary circuit and other processes generated large amounts of alpha bearing waste, mostly liquid, having sludge phases with specific physical-chemical and radiological properties. Up to 1994, the approach for eliminating the consequences of the accident was based on safety priorities. The systematic approach, which includes also the rehabilitation of the affected environment, was implemented in the period 1994-2008. The process includes also establishing of the decommissioning infrastructure, legislative and funding system with the aim to implement the standard decommissioning procedures after 2008. However, the specific aspects, especially the level and radio-nuclide composition of contamination of systems and structures will remain. For final decommissioning 2008-2033, the approach was selected which foresees four licensed phases. This approach enables proper planning and performing of individual decommissioning phases. (authors)

  15. Strategy of a Slovak back-end part of nuclear energy and financing of decommissioning of NPP A1

    International Nuclear Information System (INIS)

    Slugen, V.

    2014-01-01

    The base for all consideration about financing of decommissioning of NPPs after accident should be the national Strategy of a Back-end of Nuclear Energy. In case of the Slovak Republic, there exist roles stated in actual Strategy which was issued by Slovak Government at 21.5.2008 and prepared by National nuclear found of SR. This Strategy was currently up-grated and given to the discussions before acceptance at national level by Government. Financing of decommissioning costs of NPP A1 was recalculated and adapted according to the actual state of art in available technology as well as human potential in Slovakia. (authors)

  16. Comparison of Planning, Management and Organizational Aspects of Nuclear Power Plants A1 and V1 Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Stubna, M.; Michal, V., E-mail: Marian.Stubna@vuje.sk, E-mail: V.Michal@iaea.org [VUJE, Inc. Trnava (Slovakia); Daniska, V., E-mail: Daniska@decom.sk [DECOM, Inc. Trnava (Slovakia); Sirota, J., E-mail: Sirota.Jan@javys.sk [JAVYS, Inc. Bratislava, (Slovakia)

    2013-08-15

    This contribution deals with planning, management and organizational aspects of decommissioning of NPP shut down due to the accident (prototype NPP A1) and NPP shut down after normal operation (NPP V1). The A1 and V1 NPPs are located very close in Bohunice nuclear site however both plants have very different technology and operational history. The preparation of A1 NPP decommissioning strategy and relevant decommissioning plans was long term process, because the plant was shut down after the accident in 1977 and decommissioning was implemented first time in Slovakia with many specific difficulties. The decommissioning planning of V1 NPP was shorter and easier, because the plant was shut down after normal operation, there were lessons learned from the A1 NPP decommissioning planning, available legislation, available financing etc. Development of decommissioning strategies, preparation and planning for decommissioning, development of legislation for decommissioning, management of decommissioning projects and other aspects are described and compared. Lessons learned are formulated on the basis of analysis of past, ongoing and planned decommissioning activities in Slovakia. (author)

  17. Irradiation Embrittlement Monitoring Programs of RPV's in the Slovak Republic NPP's

    International Nuclear Information System (INIS)

    Kupca, Ludovik

    2006-01-01

    Four types of surveillance programs were (are) realized in Slovak NPP's: 'Standard Surveillance Specimen Program' (SSSP) was finished in Jaslovske Bohunice V-2 Nuclear Power Plant (NPP) Units 3 and 4, 'Extended Surveillance Specimen Program' (ESSP), was prepared for Jaslovske Bohunice NPP V-2 with aim to validate the SSSP results, For the Mochovce NPP Unit 1 and 2 was prepared completely new surveillance program 'Modern Surveillance Specimen Program' (MSSP), based on the philosophy that the results of MSSP must be available during all NPP service life, For the Bohunice V-1 NPP was finished 'New Surveillance Specimen Program' (NSSP) coordinated by IAEA, which gave arguments for prolongation of service life these units for minimum 20 years, New Advanced Surveillance Specimen Program (ASSP) for Bohunice V-2 NPP (units 3 and 4) and Mochovce NPP (units 1, 2) is approved now. ASSP is dealing with the irradiation embrittlement of heat affected zone (HAZ) and RPV's austenitic cladding, which were not evaluated till this time in surveillance programs. SSSP started in 1979 and was finished in 1990. ESSP program started in 1995 and will be finished in 2007, was prepared with aim of: increasing of neutron fluence measurement accuracy, substantial improvement the irradiation temperature measurement, fixed orientation of samples to the centre of the reactor core, minimum differences of neutron dose for all the Charpy-V notch and COD specimens, the dose rate effect evaluation. In the year 1996 was started the new surveillance specimen program for the Mochovce RPV's unit-1 and 2, based on the fundamental postulate - to provide the irradiation embrittlement monitoring till the end of units operation. The 'New Surveillance Specimen Program' (NSSP) prepared in the year 1999 for the Bohunice V-1 NPP was finished in the year 2004. Main goal of this program was to evaluate the weld material properties degradation due to the irradiation and recovery efficiency by annealing too. The

  18. Selection of optimal treatment procedures for non-standard radioactive waste arising from decommissioning of NPP after accident

    Energy Technology Data Exchange (ETDEWEB)

    Strážovec, Roman, E-mail: strazovec.roman@javys.sk [Institute of Nuclear and Physical Engineering, Slovak University of Technology in Bratislava, Ilkovičova 3, 812 19 Bratislava (Slovakia); JAVYS, a.s., Tomášikova 22, 821 02 Bratislava (Slovakia); Hrnčíř, Tomáš [DECOM, a.s., Sibírska 1, 917 01 Trnava (Slovakia); Lištjak, Martin [Institute of Nuclear and Physical Engineering, Slovak University of Technology in Bratislava, Ilkovičova 3, 812 19 Bratislava (Slovakia); VUJE, a.s., Okružná 5, 918 64 Trnava (Slovakia); Nečas, Vladimír [Institute of Nuclear and Physical Engineering, Slovak University of Technology in Bratislava, Ilkovičova 3, 812 19 Bratislava (Slovakia)

    2016-05-15

    The decommissioning of nuclear power plants is becoming a standard industrial activity where the optimization processes of partial activities are inevitable mainly for technical and economic reasons. In Slovakia, the decommissioning of A1 NPP is very specific case because A1 NPP is rare type of NPP (prototype) and furthermore its operation was affected by the accident. A large number of specific non-standard radioactive waste, such as long-time storage cases (hereinafter LSC), that is not usually present within the decommissioning projects of NPP with a regular termination of operation, represent one of the significant consequences of the accident and issues arisen from follow-up activities. The presented article describes the proposal of processing and conditioning of non-standard radioactive waste (such as LSC), together with description of methodology applied in the proposal for update of waste acceptance criteria for the processing and conditioning of radioactive waste (hereinafter RAW) within Bohunice Radioactive waste Treatment and Conditioning Centre (hereinafter RWTC). The results of performed detailed analysis are summarized into new waste acceptance criteria for technological lines keeping in mind safety principles and requirements for protection of operating personnel, the public and the environment.

  19. Chemical composition determination of Bohunice 1 and 2 RPVs and hardness measurements of RPVs material

    International Nuclear Information System (INIS)

    Kupca, L.; Brezina, M.; Beno, P.; Kniz, I.

    1994-01-01

    The base informations of all activities concerning the material properties recovery performed before and after annealing procedure on the first two units V-230 type in NPP V-1, are the topic of this paper. The samples of weld and base metal from both RPVs NPP V-1 were prepared by special apparatus in the very narrow gap between the outside surface of the RPV and the reactor thermal shielding in the reactor cavity, from the critical circumferential weld joint no.4. The chemical composition of the samples was analyzed in Nuclear Power Plants Research Institute (VUJE) laboratories. Except these results achieved from the analysis of the irradiated samples are presented the evaluation results of the chemical composition influence on the RPVs materials brittle fracture temperatures. All these results which served as input data for the irradiation embrittlement recovery evaluation of the both RPV NPP V-1 in Jaslovske Bohunice, are presented in the form of the trend curves for both RPVs. (author). 10 refs, 7 figs, 1 tab

  20. Upgrading of the radiation protection system at the V1 NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Kaizer, J.; Svitek, J.

    2003-01-01

    The original radiation protection system at Bohunice V1 NPP from the 1970s was upgraded so as to meet current national as well as international standards. The article describes the upgrading of the radiation control system (teledosimetry, emergency measurement in the hermetic zone, liquid discharges, gaseous discharges, service water, remote measurement, hygiene loop, contamination monitoring at the controlled zone exit and activity monitoring at the NPP exit, special laundry, instrument calibration), dosimetry, software, and personnel contamination inspection/measurement. (author)

  1. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  2. Experience in modernization of safety I and C in VVER 440 nuclear power plants Bohunice V1 and Paks

    International Nuclear Information System (INIS)

    Martin, M.

    2000-01-01

    For nuclear power plants which have been in operation for more than 15 years, backfitting or even complete replacement of the instrumentation and control (I and C) equipment becomes an increasingly attractive option, motivated not only by the objective to reduce the cost of I and C system maintenance and repair but also to prolong or at least to safeguard the plant life-time: optimized spare-part management through use of standard equipment; reduction of number and variety of different items of equipment by implementing functions stepwise in application software; adding new functionality in the application software which was not possible in the old technology due to lack of space; safeguarding of long-term After-Sales-Service. Some years ago Bohunice V1 NPP, Slovak Republic and Paks NPP, Hungary intended to replace parts of their Safety I and C, mainly the Reactor Trip System, the Reactor Limitation System and the Neutron Flux Excore Instrumentation and Monitoring Systems. After a Basic Engineering Phase in Bohunice V1 and a Feasibility Study in Paks both plants decided to use the Siemens' Digital Safety I and C System TELEPERM XS to modernize their plants. Both Bohunice, Unit 2 and Paks, Unit 1 have been back on line for over six months with the new Digital Safety I and C. At the present time Bohunice, Unit 1 and within the next few months Paks, Unit 2 will be replaced. Trouble-free start-ups and no major problems under operation in the first two plants were based on: thorough understanding of the VVER 440 technology; comprehensive planning together with the plant operators and authorities; the possibility to adapt TELEPERM XS to every plant type; the execution of extensive pre-operational tests. Regarding these modernization measures Siemens, as well as the above Operators, have gained considerable experience in the field of I and C Modernization in VVER 440 NPPs. Important aspects of this experience are: how to transfer the VVER technology to TELEPERM XS; how to

  3. Backfitting of Nuclear Power Plant Bohunice V1 in Slovakia

    International Nuclear Information System (INIS)

    Ferenc, M.

    1999-01-01

    Nuclear power plants in the Slovak Republic generate almost 55 % of electricity. The operating organization and the Nuclear Regulatory Authority of the Slovak Republic pay a great attention to safe and reliable operation of four units with VVER 440 reactors at Bohunices site and one in Mochovce side. Engineering and design organizations in cooperation with well known international companies prepare evaluation of safety conditions, safety analyses and projects for the implementation of modifications to upgrade the nuclear safety of the units in operation. A gradual safety upgrading (reconstruction) of the V-1 Bohunice plant has been in progress, a modernization of the V-2 Bohunice plant is being prepared. Simultaneously the commissioning of Unit 2 at the Mochovce plant is being implemented.(author)

  4. The V-1 NPP and V-2 NPP upgrading

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in the V-1 NPP and V-2 NPP upgrading as well as maintenance carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. The V-1 NPP applied the so called 'Small Backfitting Programme'covering 81 points of the Czechoslovak Atomic energy Commission Decree No 5/91. Continual upgrading continued after the Backfitting Programme completion with the Safety Report and following Nuclear Regulatory Authority of Slovak Republic (NRA SR) Decrees No 1/94 and 110/94 setting spheres and procedure for adopting and implementation of measures enabling the units to operate further on. Results of expert missions, analyses and assessments of components identified by Basic Engineering became the basis for the development of the Gradual Reconstruction Programme. The Programme outputs underwent economic and probabilistic assessing their contribution to nuclear safety. This process resulted in finalizing the Gradual Reconstruction Programme which started to be implemented in 1996 and will be completed in 1999. It is implemented by the REKON consortium and covers 17 areas including Instrumentation and Control, self-consumption emergency supply, leakage monitoring, emergency core cooling system, seismic reinforcement and radioactivity localisation. Both units will reach internationally acceptable safety standards for the remaining life-time period. The V-2 NPP Upgrading and Safety Enhancement Programme includes results of activities performed in the course of last years to define all important activities leading to enhancement of nuclear safety and performance reliability and effectiveness within the plant life-time period and to establish conditions for extending the life-time of these units for 40 years. The V-2 NPP Upgrading and Safety Enhancement Programme aims to assure safe operation with a probability of the core damages less than 10 -4 /reactor · year

  5. Management of the Bohunice RPVs annealing procedures

    International Nuclear Information System (INIS)

    Repka, M.

    1994-01-01

    The program of annealing regeneration procedure of RPVs units 1 and 2 of NPP V-1 (EBO) realization in the year 1993, is the topic of this paper. In the paper the following steps are described in detail: the preparation works, the annealing procedure realization schedule and safety management: starting with zero conditions, assembling of annealing apparatus, annealing procedure, cooling down and disassembling procedure of annealing apparatus. At the end the programs of annealing of both RPVs including the dosimetry measurements are discussed and evaluated. (author). 3 figs

  6. VUJE experience with large scale projects and their applicability to the future of the Slovak energy system

    International Nuclear Information System (INIS)

    Ferenc, M.

    2004-01-01

    In this presentation author deals with participation of VUJE Trnava, Inc. on the reconstruction of the Bohunice V1 NPP, on modernisation of the Bohunice V2 NPP, and on of the projects in nuclear energy industry including of decommissioning of the Bohunice A1 NPP

  7. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  8. Radioactive waste handling at the Mochovce NPP, 1998-2008

    International Nuclear Information System (INIS)

    Vasickova, Gabriela

    2009-01-01

    The radioactive waste management system at the Mochovce NPP is described. The system addresses technical aspects as well as administrative provisions related to radioactive waste generated within the controlled area, from the waste generation phase to waste sorting, packaging, storage, recording, measurement, and transportation to the Bohunice waste processing facility or transfer to the Mochovce liquid radioactive waste treatment facility. The article also addresses conditions for release from the controlled area to the environment for radioactive waste which can be exempt from the institutional administrative control system or released to the environment on the basis of a valid permission issued by the relevant regulatory authority

  9. Seismic re-evaluation criteria for Bohunice V1 reconstruction

    International Nuclear Information System (INIS)

    Campbell, R.; Schlund, H.; Warnken, L.

    2001-01-01

    Bohunice V1 in Slovakia is a Russian designed two unit WWER 440, Model 230 Pressurized Water Reactor. The plant was not originally designed for earthquake. Subsequent and ongoing reassessments now confirm that the seismic hazard at the site is significant. EBO, the plant owner has contracted with a consortium lead by Siemens AG (REKON) to do major reconstruction of the plant to significantly enhance its safety systems by the addition of new systems and the upgrading of existing systems. As part of the reconstruction, a complete seismic assessment and upgrading is required for existing safety relevant structures, systems and components. It is not practical to conduct this reassessment and upgrading using criteria applied to new design of nuclear power plants. Alternate criteria may be used to achieve adequate safety goals. Utilities in the U.S. have faced several seismic issues with operating NPPs and to resolve these issues, alternate criteria have been developed which are much more cost effective than use of criteria for new design. These alternate criteria incorporate the knowledge obtained from investigation of the performance of equipment in major earthquakes and include provisions for structures and passive equipment to deform beyond the yield point, yet still provide their essential function. IAEA has incorporated features of these alternate criteria into draft Technical Guidelines for application to Bohunice V1 and V2. REKON has developed plant specific criteria and procedures for the Bohunice V1 reconstruction that incorporate major features of the U.S. developed alternate criteria, comply to local codes and which envelop the draft IAEA Technical Guidelines. Included in these criteria and procedures are comprehensive walkdown screening criteria for equipment, piping, HVAC and cable raceways, analytical criteria which include inelastic energy absorption factors defined on an element basis and testing criteria which include specific guidance on interpretation

  10. Fire fighting precautions at Bohunice Atomic Power Plants

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    Some shortcomings are discussed of the project design of fire protection at the V-1 and V-2 nuclear power plants. The basic shortcoming of the system is insufficient division of the units for fire protection. Fire fighting measures are described for cable areas, switch houses and outside transformers, primary and secondary circuits and auxiliary units. Measures are presented for increasing fire safety in Jaslovske Bohunice proceedi.ng from experience gained with a fire which had occurred at a nuclear power plant in Armenia. (E.S.)

  11. Reuse of discharged fuel in Bohunice-1,2 units

    International Nuclear Information System (INIS)

    Chrapciak, V.; Majercik, J.; Kacmar, M.

    2003-01-01

    During the reconstruction of Bohunice-1,2 units (1997 - 2001), their cycle lengths dropped to very short values. Because of 4-year limit to fuel residence time, refuelling with fresh 2.4 % enriched assemblies seemed to be a solution of the problem. The paper describes the implementation of a final decision to reuse 3.6 % enriched fuel discharged after 3-year irradiation in previous cycles. This decision led to a large-scale moving of discharged assemblies from spent fuel pools back to reactors (Authors)

  12. Bohunice NPPs - Part of the Slovak's economy (sustainable) development

    International Nuclear Information System (INIS)

    Dobak, Dobroslav

    2001-01-01

    Of the total consumption of electricity in Slovakia, 42% was generated in nuclear power plant units in 1999. Slovakia operates 6 units with a WWER 440 nuclear reactors, 4 of them are at Bohunice site and 2 at Mochovce. The Nuclear Regulatory Authority of SR is not the only regulatory body controlling nuclear activity. Both - the system of nuclear activities regulation in Slovakia as well as the approach to Nuclear Safety enhancement of the operator were positively judged by IAEA and WENRA. In 1993 -Slovakia has accepted the commitments of the UN Convention on Climate Changes, including a reduction of greenhouse gases to 1990 levels by the year 2000. Moreover, as an internal target Slovakia has set the reaching of the ,'Toronto Objective', i.e. 20% reduction in CO x emissions through the year 2005 as compared to 1988. Taking into account the actual situation as well as natural conditions for some renewable sources utilisation, the target won't be reached without nuclear energy. The nuclear energy is free of emissions, does not burn oxygen, and with the share of production in Slovakia will remain significant contributor. To the environment protection it contributes also by replacing fossil heat plants with heat delivery for the region. In case of radiological wastes the environment protection is ensured by very strict system of control, evidence, treatment and repository. To conclude, Bohunice NPPs were, are and will remain very important part of the Slovak's economy, creating conditions for its (sustainable) development

  13. Report of the IPERS (International Peer Review Service) review mission for the Bohunice-V2 nuclear power plant Level 1 probabilistic safety assessment in the Slovak Republic 17 to 28 January 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services (IPERS) review of the probabilistic safety assessment (PSA) for the Bohunice-V2 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and the plant operator. The results presented herein reflect the views of the international experts carrying out the review. They are provided for consideration by the responsible authorities of the Slovak Republic. 12 refs, 4 tabs

  14. Application of Moessbauer spectroscopy on corrosion products of NPP

    Energy Technology Data Exchange (ETDEWEB)

    Dekan, J., E-mail: julius.dekan@stuba.sk; Lipka, J.; Slugen, V. [Institute of Nuclear and Physical Engineering, Faculty of Electrical Engineering and Information Technology, SUT (Slovakia)

    2013-04-15

    Steam generator (SG) is generally one of the most important components at all nuclear power plants (NPP) with close impact to safe and long-term operation. Material degradation and corrosion/erosion processes are serious risks for long-term reliable operation. Steam generators of four VVER-440 units at nuclear power plants V-1 and V-2 in Jaslovske Bohunice (Slovakia) were gradually changed by new original 'Bohunice' design in period 1994-1998, in order to improve corrosion resistance of SGs. Corrosion processes before and after these design and material changes in Bohunice secondary circuit were studied using Moessbauer spectroscopy during last 25 years. Innovations in the feed water pipeline design as well as material composition improvements were evaluated positively. Moessbauer spectroscopy studies of phase composition of corrosion products were performed on real specimens scrapped from water pipelines or in form of filters deposits. Newest results in our long-term corrosion study confirm good operational experiences and suitable chemical regimes (reduction environment) which results mostly in creation of magnetite (on the level 70 % or higher) and small portions of hematite, goethite or hydrooxides. Regular observation of corrosion/erosion processes is essential for keeping NPP operation on high safety level. The output from performed material analyses influences the optimisation of operating chemical regimes and it can be used in optimisation of regimes at decontamination and passivation of pipelines or secondary circuit components. It can be concluded that a longer passivation time leads more to magnetite fraction in the corrosion products composition.

  15. Safety improvement programme of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    2000-01-01

    A brief overview is given of the power sources in Slovakia which include 6 operational reactor units (4 at Jaslovske Bohunice and 2 at Mochovce) and 2 units under construction (at Mochovce). The efforts undertaken in the past 10 years and aimed at upgrading the nuclear safety of the two older (V-230 Soviet type) units at Bohunice are highlighted. The relevant regulatory decisions are dealt with and the measures already carried out are listed. Also characterized are several IAEA international safety assessment missions and safety-aimed meetings which took place in 1998 and 1999 and are of concern to the older Bohunice units. (A.K.)

  16. Belene NPP

    International Nuclear Information System (INIS)

    Tsvetanov, P.

    1990-01-01

    The book presents the main results of the studies of the Bulgarian Academy of Sciences (BAS) on the construction of a new nuclear power plant at Belene on the Danube river. The programme of the studies comprises five areas: the socio-economic and energy development and the necessity of the commissioning; a technical project and design level of the equipment (safety, radioactivity control, waste disposal and economic efficiency of the power plant); the seismic properties of the construction site; the corresponding risk and design features of the plant; the ecological impacts of the NPP and public opinion. The studies in the different areas have been carried out by independent teams, fully responsible for the formulated topical conclusions. The general opinion of the BAS voiced in the book is that the construction of Belene NPP is not sufficiently substantiated and is considered unacceptable. 94 refs., 53 fig., 56 tabs. (R.Ts.)

  17. District heating by the Bohunice nuclear power plant

    International Nuclear Information System (INIS)

    Metke, E.; Skvarka, P.

    1984-01-01

    Technical and economical aspects of district heating by the electricity generating nuclear plants in Czechoslovakia are discussed. As a first stage of the project, 240 MW thermal power will be supplied using bleeding lines steam from the B-2 nuclear power plant at Jaslovske Bohunice to heat up water at a central station to 130 grad C. The maximal thermal power that can be produced for district heating by WWER type reactors with regular condensation turbines is estimated to be: 465 MW for a WWER-440 reactor with two 220 MWe turbines and 950 MW for a WWER-1000 reactor with a Skoda made 1000 MWe turbine using a three-stage scheme to heat up water from 60 grad C to 150 grad C. The use of satelite heating turbines connected to the steam collector is expected to improve the efficiency. District heating needs will de taken into account for siting of the new power plants

  18. Seismic evaluation and strengthening of Bohunice nuclear power plant structures

    International Nuclear Information System (INIS)

    Shipp, J.G.; Short, S.A.; Grief, T.; Borov, V.; Kuzma, J.

    2001-01-01

    A seismic assessment and strengthening investigation is being performed for selected structures at the Bohunice V1 Nuclear Power Plant in Slovakia. Structures covered in this paper include the reactor building complex and the emergency generator station. The emergency generator station is emphasized in the paper as work is nearly complete while work on the reactor building complex is ongoing at this time. Seismic evaluation and strengthening work is being performed by a cooperative effort of Siemens and EQE along with local contractors. Seismic input is the interim Review Level Earthquake (horizontal peak ground acceleration of 0.3 g). The Bohunice V1 reactor building complex is a WWER 4401230 nuclear power plant that was originally built in the mid-1970s but had extensive seismic upgrades in 1991. Siemens has performed three dimensional dynamic analyses of the reactor building complex to develop seismic demand in structural elements. EQE is assessing seismic capacities of structural elements and developing strengthening schemes, where needed. Based on recent seismic response analyses for the interim Review Level Earthquake which account for soil-structure interaction in a rigorous manner, the 1991 seismic upgrade has been found to be inadequate in both member/connection strength and in providing complete load paths to the foundation. Additional strengthening is being developed. The emergency generator station was built in the 1970s and is a two-story unreinforced brick masonry (URM) shear wall building above grade with a one story reinforced concrete shear wall basement below grade. Seismic analyses and testing of the URM walls has been performed to assess the need for building strengthening. Required structural strengthening for in-plane forces consists of revised and additional vertical steel framing and connections, stiffening of horizontal roof bracing, and steel connections between the roof and supporting walls and pointing of two interior transverse URM

  19. Mitsubishi nuclear technologies and construction of new Bohunice

    International Nuclear Information System (INIS)

    Yoshizu, T.

    2009-01-01

    Mitsubishi Heavy Industries (MHI) has setup Generation III+ category power plant technologies both in large and middle size reactors as a key player in the global market of nuclear plant suppliers. MHI has developed 1,700 MWe class Advanced Pressurized Water Reactor for European utilities, EU-APWR, utilizing the APWR technology in Japan. The plant configuration is based on the proven technologies from MHI's ample experiences, but various advanced technologies are adopted to achieve enhanced safety, reliability, and economy. For the regions without large grid capacity, middle-sized nuclear power plant will be an attractive option for the utilities. Joint Venture ATMEA with AREVA NP will serve ATMEA1. The ATMEA1 will offer 1,100 MWe output with superior operation performance based on reliable and proven technologies. Mitsubishi has experience of half century for all of 26 PWR plants in Japan. The latest plant is Tomari Unit 3 of 1,000 MWe, which has completed the construction work and now in the final commissioning test. Tomari Unit 3 applies some advanced technologies such as all digital I and C, which are to be implemented in the EU-APWR. Based on this construction experience, Mitsubishi can contribute any kind of demands for New Bohunice 5 th unit project with the total engineering capability. (author)

  20. Termination of exploitation of V 1 NPP - BIDSF projects

    International Nuclear Information System (INIS)

    Pnackova, L.

    2004-01-01

    In this paper the interview with engineer Peter Hlbocky, director of division of the Project of decommissioning of V 1 Nuclear Power Plant in Jaslovske Bohunice is presented. Project Manager Unit (PMU) was formed on the basis of directive of the General Director of the Slovenske elektrarne, a.s. The Director of the Division of decommissioning of the V 1 NPP and at the same time the Main manager of the PMU is engineer Peter Hlbocky. On this project participate 19 employees of the Slovenske elektrarne, a. s. (SE), 6 abroad employees of the consortium IBERINCO, 15 employees of the VUEZ and 25 abroad employees on the detached place of work in the Spain and France

  1. Mochovce NPP simulator

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Mochovce NPP simulator basic features and detailed description of its characteristics are presented with its performance, certification and application for training of NPP operators as well as the training scenario

  2. The common project for completion of Bubbler Condenser Qualification (Bohunice, Mochovce, Dukovany and Paks NPPs)

    International Nuclear Information System (INIS)

    Jaroslav, H.; Pavol, B.

    2003-01-01

    Described is the common project for completion of bubbler condenser qualification for nuclear power plants in Bohunice, Mochovice, Dukovany and Paks. Functionality of the bubbler condenser was elaborated during the simulation of the main steam line brake, medium break and small break LOCA. On this basis the appropriate operation of bubbler condenser containment under accident conditions can be positively confirmed

  3. Final results of the gradual reconstruction of Bohunice VI in Slovakia and evaluation of the reconstruction by international missions

    International Nuclear Information System (INIS)

    Ferenc, M.

    2001-01-01

    The gradual reconstruction of the Bohunice V1 nuclear power plant (Slovakia) represents the most extensive reconstruction of a nuclear power plant in operation as implemented worldwide up to now. Extensive reconstruction works in both civil construction and process parts, in instrumentation and control part, and in electric part enhanced both nuclear safety and operational reliability of Bohunice V1 in a significant way.(author)

  4. Decommissioning of Brennilis NPP

    International Nuclear Information System (INIS)

    Baize, Jean-Marc

    1998-01-01

    This EDF press communique give information related to the decommissioning of the Brennilis NPP. The following five items are developed in this report: 1. the level-2 decommissioning operations at the Brennilis NPP; 2. the Brennilis NPP, a pilot operation from the commissioning up to the decommissioning; 3. history of the Brennilis NPP decommissioning; 4. the types of radioactive wastes generated by the Brennilis NPP decommissioning; 5. the Brennilis NPP - a yard management as a function of the wastes. The document contains also seven appendices addressing the following subjects: 1. the share of decommissioning assigned to EDF and the decommissioning steps; 2. the EDF installations in course of decommissioning; 3. the CEA decommissioned installations or in course of decommissioning; 4. regulations; 5. costs; 6. waste management - principles; 7. data on the decommissioning yard

  5. NPP life management (abstracts)

    International Nuclear Information System (INIS)

    Litvinskij, L.L.; Barbashev, S.V.

    2002-01-01

    Abstracts of the papers presented at the International conference of the Ukrainian Nuclear Society 'NPP Life Management'. The following problems are considered: modernization of the NPP; NPP life management; waste and spent nuclear fuel management; decommissioning issues; control systems (including radiation and ecological control systems); information and control systems; legal and regulatory framework. State nuclear regulatory control; PR in nuclear power; training of personnel; economics of nuclear power engineering

  6. Polish media and public opinion on NPP Mochovce commissioning

    International Nuclear Information System (INIS)

    Latek, Stanislaw

    1999-01-01

    The so called 'Mochovce Problem' was one of the major topics in Polish media in the period from May to July 1998. The nuclear power plant commissioning caused an unexpectedly strong reaction, especially in the newspapers, slightly less so in electronic media. Faced with clearly hostile media reaction to Mochovce NPP, the National Atomic Energy Agency representatives, together with atomic and nuclear experts, undertook to change these attitudes. In numerous interviews, letters to the editors and talks with journalists, they attempted to correct the mistakes, explain the true safety situation in the nuclear power plant, by whom it was constructed, who supervised and tested the systems and so on. The completion of Mochovce NPP construction improved significantly the electricity balance in Slovakia, thus decreasing the pressure for continuing the operation of older Bohunice V1 units beyond their design lifetime. For this reason, as well as in view of striving for improvement in environmental factors beyond Polish southern border, especially after Kyoto/97 decisions on greenhouse gases emissions, the public opinion in Poland should support the Mochovce NPP construction. In 1996 Poland has signed with Slovakia a bilateral inter-governmental agreement on the prompt notification on nuclear accidents and on the cooperation in the nuclear safety and radiological protection matters. On the basis of this agreement the experts from Polish National Atomic Energy Agency are in perpetual contact with Slovakian Nuclear Regulatory Body and in each and every moment can obtain full and comprehensive information on the plant parameters iportant for nuclear safety. The experts explanations, together with the NAEA top management visit to the plant itself, brought some results. The media became less aggressive, and Polish public and authorities - contrary to the Austrians - do not protest loudly against the commissioning of this newest European NPP. Now, in December 1998, the tune of

  7. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  8. The LBB methodology application results performed on the safety related piping of NPP V-1 in Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L.; Beno, P. [Nuclear Power Plants Research Institute, Trnava (Slovakia)

    1997-04-01

    A broad overview of the leak before break (LBB) application to the Slovakian V-1 nuclear power plant is presented in the paper. LBB was applied to the primary cooling circuit and surge lines of both WWER 440 type units, and also used to assess the integrity of safety related piping in the feed water and main steam systems. Experiments and calculations performed included analyses of stresses, material mechanical properties, corrosion, fatigue damage, stability of heavy component supports, water hammer, and leak rates. A list of analysis results and recommendations are included in the paper.

  9. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  10. Current status of LTO licensing programme for Bohunice nuclear power plant

    International Nuclear Information System (INIS)

    Borak, J.; Kupca, L.

    2012-01-01

    The objective of long term operation (LTO) licensing programme for Bohunice nuclear power plant is to demonstrate that the relevant structures and components shall perform their functions throughout the entire LTO period during which they shall meet all the relevant safety requirements. All the activities-which should result in utility's request to obtain the licence for LTO-must be performed in line with the relevant legal basis. As of May 2012, the anticipated duration of currently running programme is thirteen months. All relevant documentation, required by the established legal basis, shall be submitted to the licensing authority one year before the Unit 3 design life expiry. (author)

  11. Design of fuel loading for Bohunice V-1 Unit 2 reaktor for fuel cycle No.19

    International Nuclear Information System (INIS)

    Majercik, J.

    1998-01-01

    The report contains description of the design of fuel loading for the fuel cycle No. 19 in the V-1 Bohunice Unit 2 reactor. Input data and computer codes used for the development of the design are shown. The fuel loading is characterized by the assortment of the fuel loaded and by the scheme of re shuffling of assemblies in the core. An evaluation of basic neutronic core parameters as relates to the compliance with safety criteria is a part of the report as well

  12. Radiological characterisation on V1 NPP technological systems and buildings - Contamination

    International Nuclear Information System (INIS)

    Hanzel, Richard; Rapant, Tibor; Svitek, Jaroslav

    2012-01-01

    Since 2001, the preparation of V1 NPP practical decommissioning has been supported and partly financed by the Bohunice International Decommissioning Support Fund, under the administration of the European bank for Reconstruction and development. AMEC Nuclear Slovakia, together with partners STM Power and EWN GmbH, performed BIDSF B.4 project - Decommissioning database development. The main purpose of the B6.4 project was to develop a comprehensive physical and radiological inventory database to support RAW management development of the decommissioning studies and decommissioning project of Bohunice V1 NPP. AMEC Nuclear Slovakia was responsible mainly for DDB design, planning documents and physical and radiological characterization including sampling and analyses of the plant controlled area. The objective of V1 NPP radiological characterization was summarisation of sampling and analyses results, description of methodology used for radiological characterization and determination of the V1 NPP radiological inventory. Results of the characterization survey included the identification and distribution of contamination in buildings, structures, and other site facilities or other impacted media. The characterization survey clearly identified those portions of the site that have been affected by site activities and are contaminated. The survey also identified the portions of the site that have not been affected by these activities and can be marked as 'not impacted'. Radiological data have been presented also on the basis of index RAI level, where 5 radiological classes have been defined. On the basis of sampling and analyses results following radiological parameters have been assigned to all impacted components and civil structures included in DDB: dose rate in contact, dose rate in distance 1 m, external surface contamination, internal surface contamination and volume/mass contamination. Each room in controlled area has been described by following radiological parameters

  13. Radiological characterisation of V1 NPP technological systems and buildings - Activation

    International Nuclear Information System (INIS)

    Kristofova, Kristina; Rapant, Tibor; Svitek, Jaroslav

    2012-01-01

    V1 NPP at Jaslovske Bohunice site has been finally shutdown after 28 years of successful operation in 2006 (Unit 1) and 2008 (Unit 2). At present, both units are finally shutdown and since July 2011 under decommissioning license. The preparation of V1 NPP decommissioning has been supported and partly financed by the Bohunice International Decommissioning Support Fund (BIDSF), under the administration of the European Bank for Reconstruction and Development. From 06/2008 to 12/2011 AMEC Nuclear Slovakia, together with partners STM Power and EWN GmbH, carried out BIDSF B6.4 project - Decommissioning database development (DDB). The main purpose of the B6.4 project was to develop a physical and radiological inventory database to support V1 NPP decommissioning process planning and performance. One of the specific deliverable tasks within the B6.4 project was deliverable D12 - Characterization of activated equipment and civil structures based on measurement, sampling and analyses performed on the samples. The scope of deliverable services within D12 task consisted of: 1. Categorization of activated components ; 2. Development of single working programs for their radiological monitoring and sampling ; 3. Preparation of sampling device and revision of all handling equipment; 4. Dose rate monitoring and sampling of: - Civil structures from reactors shaft on both units ; - Components placed in HLW storage, (so called 'Mogilnik') - connection rods, absorbers ; of control rod assemblies and neutron flux measurement channels ; - Reactor pressure vessel and shielding assemblies at both units of V1 NPP, reactor; internals from Unit 2 of V1 NPP; 5. Analysis of samples ; 6. Determination of radiological inventory ; 7. Import of radiological data for activated components into DDB. During sampling, mainly remotely controlled sampling device and radiation resistant camera with LED lightening for visual checking of all performed activities was used. In total, 125 samples have been taken

  14. Environment monitoring and residents health condition monitoring of nuclear power plant Bohunice region

    International Nuclear Information System (INIS)

    Letkovicova, M.; Rehak, R.; Stehlikova, B.; Celko, M.; Hraska, S.; Klocok, L.; Kostial, J.; Prikazsky, V.; Vidovic, J.; Zirko, M.; Beno, T.; Mitosinka, J.

    1998-01-01

    The report contents final environment evaluation and selected characteristic of residents health physics of nuclear power plant Bohunice region. Evaluated data were elaborated during analytical period 1993-1997.Task solving which results are documented in this final report was going on between 1996- 1998. The report deals in individual stages with the following: Information obtaining and completing which characterize demographic situation of the area for the 1993-1997 period; Datum obtaining and completing which contain selected health physics characteristics of the area residents; Database structures for individual data archiving from monitoring and collection; Brief description of geographic information system for graphic presentation of evaluation results based on topographic base; Digital mapping structure description; Results and evaluation of radionuclide monitoring in environment performed by Environmental radiation measurements laboratory by the nuclear power plant Bohunice for the 1993-1997 period. Demographic situation evaluation and selected health physics characteristics of the area of nuclear power plant residents for the 1993-1997 period are summarized in the final part of the document. Monitoring results and their evaluation is processed in graph, table, text description and map output forms. Map outputs are processed in the geographic information system Arc View GIS 3.0a environment

  15. Nuclear installations in Slovakia accords to the convention definition

    International Nuclear Information System (INIS)

    1998-01-01

    In this part the nuclear power plants Bohunice - Units V-1 and V-2 and NPP Mochovce (description of units, safety reports and safety improvement programs) are described. Description of Bohunice A-1, history and current status of the NPP A-1 and NPP decommissioning program are included. In next parts interim spent fuel storage, technologies of Raw processing and treatment, and treated and solid Raw storage sites are described

  16. EMAS at Doel NPP

    International Nuclear Information System (INIS)

    Nolan, Peter; Thoelen, Els

    1998-01-01

    In October 1995, Doel NPP of Electrabel, Belgium opted to seek registration under the EC Eco-management and Audit Scheme (EMAS). A comprehensive environmental management system (EMS) has been introduced and implemented, encompassing all four PWRs and the supporting departments. A critical step was to seek certification from an accredited environmental auditing body against the International Standard ISO 14001. This provided the foundation for the publicly available environmental statement required by EMAS. The complications of achieving EMAS at a time when national and international standards were being re-formulated were successfully overcome and Doel NPP passed its EMAS audit in June 1997. (author)

  17. Cooperation of the SKODA Works in physical starting of the A-1 nuclear power plant

    International Nuclear Information System (INIS)

    Zbytovsky, A.

    1974-01-01

    Co-ordinated research and development efforts of the SKODA Works in the construction, commissioning and start-up of the A-1 nuclear power plant at Jaslovske Bohunice are described. The share of the SKODA Works in the cooperation with allied institutions in the USSR and with two Czechoslovak institutions, i.e., the Nuclear Research Institute at Rez and the Nuclear Power Plant at Bohunice, is detailed and documented by a schedule of experiments aimed at verifying the A-1 calculated parameters in actual operation. (L.O.)

  18. Treatment and conditioning of solid and liquid raw

    International Nuclear Information System (INIS)

    Jakubec, R.

    2015-01-01

    Jadrova a vyradovacia spolocnost, a.s. (JAVYS) implements activities within the processes of treatment and conditioning of radioactive waste (RAW) at two nuclear facilities, one of them located in Bohunice - Technologies for treatment and conditioning of RAW. This nuclear facility includes: Bohunice RAW treatment centre, bituminization lines, waste water purification station and technologies for sorting, fragmentation and decontamination of metallic RAW. The Bohunice RAW treatment centre (BRTC) in Bohunice processes and conditions liquid and solid radioactive waste produced during the A1 NPP and V1 NPP decommissioning, waste from the operation of V2 NPP in Bohunice as well as from the operation of NPP EMO 1,2 in Mochovce. The BRTC includes the following technological facilities: sorting, high-pressure compaction, incineration, concentration and cementation. Treatment of radioactive wastes in the BRTC is described. (authors)

  19. Temelin NPP commissioning experiences

    International Nuclear Information System (INIS)

    Hanus, V.

    2002-01-01

    The Building Permit for the Temelin NPP with four VVER units was issued in 1986, which is a long time ago. Since then, however, was taken a route that is very different from what anybody imagined. Described are the legislative and design changes and given is a current condition of the power plant

  20. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  1. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP KRSKO. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and the results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economical aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling all activities necessary for the decommissioning of the NPP KRSKO are presented. (author)

  2. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP Krsko. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for a decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill the decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economic aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling of all activities necessary for the decommissioning of the NPP Krsko are presented. (author)

  3. Two managerial grids in NPP

    International Nuclear Information System (INIS)

    Zhao Hui

    2012-01-01

    Today, the nuclear power corporation (NPC) enjoys the profit of LCEP (the low carbon economic policy). at the same time, they also enduring more and more pressure. For example, the partner competition or the NPP potential occupational risk . The efficient counterplot of risk is the self-ability cultivation. It is essential to research the NPP managerial flow. The nuclear power plant (NPP) unit is a carrier of the NPC enterprise management system, and has taken on a new look 'pull one portion then the whole moving'. The NPP has three systematical characters, the security responsibility center, the man-machine system and the input-output system. The manufacturing system and the enterprise management system are the great constituents of the NPP managerial flows. Means of systems analysis, we can find out the truth of the NPP running interface. In CHINA, there are many operating experiences near 20 years. It indicates that the NPP manufacturing system and the enterprise system are the roots of the nuclear power corporation, the core of the all NPP systems must be based on it. So the ability cultivation is the work core to NPP. It is reliably to ensure the NPP to be up against problems, for instance, the security duty, the costing control and the man-machine system running harmoniously. This paper introduces the NPP managerial flow and the present state of QNPC, also come up with a proposal to refer for the NPC development actions of collective measure, specialization, standardization, fine. (author)

  4. SE-VYZ - Decommissioning of Nuclear Installations, Radioactive Waste and Spent Fuel Management

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    In this presentations processes of radioactive waste treatment in the Bohunice Radioactive Waste Processing Center (SE-VYZ), Jaslovske Bohunice are presented. Decommissioning of the A-1 NPP is also presented. Disposal of conditioned radioactive waste in fibre concrete containers (FCC) are transported to Mochovce from Jaslovske Bohunice by the transport truck where are reposited in the National radioactive waste repository Mochovce. The Interim spent fuel storage facility (ISFSF) is included into this presentation

  5. Evaluation of an external exposure of a worker during manipulation with waste packages stored in Bohunice radioactive waste treatment centre

    International Nuclear Information System (INIS)

    Slimak, A.; Hrncir, T.; Necas, V.

    2012-01-01

    The paper briefly describes current state of radioactive waste management as well as radioactive waste treatment and conditioning technologies used in Bohunice Radioactive Waste Treatment Centre. Radioactive Waste management includes pretreatment, treatment, conditioning, storage, transport and disposal of radioactive waste. Presented paper deals with the evaluation of an external exposure of a worker during manipulation with fibre-reinforced concrete container stored under shelter object. The external exposure of a worker was evaluated using VISIPLAN 3D ALARA code. (Authors)

  6. Welding electrode for peripheral welds of A-1 reactor pressure vessel

    International Nuclear Information System (INIS)

    Lakatos, L.

    1975-01-01

    The properties are outlined of the VUZ-AC1-52 welding electrode used in welding the Bohunice A-1 reactor pressure vessel. The mechanical properties of welded joints after the final thermal treatment are summed up. (J.K.)

  7. Dukovany NPP operation

    International Nuclear Information System (INIS)

    Vlcek, Jaroslav

    2010-01-01

    The topics discussed include: Dukovany NPP among CEZ Group power plants; International missions at the plant; Plant operation results; and Strategic goals and challenges. Historical data are presented in the graphical form, such as the unit capacity factor, unplanned capability loss factor, unplanned automatic scrams, fuel reliability, industrial safety accident rate, collective radiation exposure, WANO index, power generation data, and maximum achievable power by the end of year. Also discussed were the company culture and human resources, maintenance, power uprate, and related phenomena. (P.A.)

  8. Cernavoda NPP Knowledge Transfer

    International Nuclear Information System (INIS)

    Valache, C. M.

    2016-01-01

    Full text: The paper presents a description of the Knowledge Transfer (KT) process implemented at Cernavoda NPP, its designing and implementation. It is underlined that applying a KT approach should improve the value of existing processes of the organization through: • Identifying business, operational and safety risks due to knowledge gaps, • Transfer of knowledge from the ageing workforce to the peers and/or the organization, • Continually learning from successes and failures of individual or teams, • Convert tacit knowledge to explicit knowledge, • Improving operational and safety performance through creating both new knowledge and better access to existing knowledge. (author

  9. Operation safety at Ignalina NPP

    International Nuclear Information System (INIS)

    Zheltobriukh, G.

    1999-01-01

    An improvement of operational safety at Ignalina NPP covers: improvement of management structure and safety culture; symptom-based emergency operating procedures; staff training and full scope simulator; program of components ageing; metal inspection; improvement of fire safety. The first plan of Ignalina NPP Safety culture development for 1997 purposed to the SAR recommendation implementation was prepared and approved by the General Director

  10. Preparation for Ignalina NPP decommissioning

    International Nuclear Information System (INIS)

    Medeliene, D.

    2004-01-01

    Latest developments of atomic energy in Lithuania, works done to prepare Ignalina NPP for final shutdown and decommissioning are described. Information on decommissioning program for Ignalina NPP unit 1, decommissioning method, stages and funding is presented. Other topics: radiation protection, radioactive waste management and disposal. Key facts related to nuclear energy in Lithuania are listed

  11. Analysis of events significant with regard to safety of Bohunice V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Suchomel, J.; Maron, V.; Kmosena, J.

    1986-01-01

    An analysis was made of operating safety of the V-1 nuclear power plant in Jaslovske Bohunice for the years 1980 - 1983. Of the total number of 676 reported failures only three were events with special safety significance, namely a complete loss of power supply for own consumption from the power grid, a failure of pins on the collectors of steam generators, and a failure of the heads of heat technology inspection channels. The failures were categorized according to the systems used in the USSR and in the USA and compared with data on failures in nuclear power plants in the two countries. The conclusions show that the operation of the V-1 nuclear power plant achieves results which are fully comparable with those recorded in 9 WWER-440 power plants operating in various countries. The average coefficient of availability is 0.72 and ranks the power plant in the fourth place among the said 9 plants. A comparison of the individual power plant units showed that of the total number of 22, the first unit of the V-1 plant ranks fifth with a coefficient of 0.78 and the second unit with a coefficient of 0.69 ranks 15th. (Z.M.)

  12. NPP Prevlaka - Preparation of construction

    International Nuclear Information System (INIS)

    Bojic, K.

    1984-01-01

    On the basis of study 'Optimal electricity generation structure till the year 2000' production of 3 x 500 MWe in nuclear power plants has been anticipated. Second Croatian-Slovenian NPP project will be based on the same principles the first one (NPP Krsko) was based on. Preconstruction investigation studies are performed at site Prevlaka on river Sava downstream of Zagreb. Licensing procedure has started with republic Urban countryside planning activities. Preconstruction activities are planned to be finished by the end of 1986. while the construction is expected to start during 1987. Parallel to investigation studies for NPP Prevlaka, evaluation of nuclear technology and reactor type is planned to be made. (author)

  13. The seismic reassessment Mochovce NPP

    International Nuclear Information System (INIS)

    Baumeister, P.

    2004-01-01

    The design of Mochovce NPP was based on the Novo-Voronez type WWER-440/213 reactor - twin units. Seismic characteristic of this region is characterized by very low activity. Mochovce NPP site is located on the rock soil with volcanic layer (andesit). Seismic reassessment of Mochovce NPP was done in two steps: deterministic approach up to commissioning confirmed value Horizontal Peak Ground Acceleration HPGA=0.1 g and activities after commissioning as a consequence of the IAEA mission indicate higher hazard values. (author)

  14. Technology for NPP decantate treatment realized at Kola NPP

    International Nuclear Information System (INIS)

    Stakhiv, Michael; Avezniyazov, Slava; Savkin, Alexander; Fedorov, Denis; Dmitriev, Sergei; Kornev, Vladimir

    2007-01-01

    At Moscow SIA 'Radon' jointly with JSC 'Alliance Gamma', the technology for NPP Decantate Treatment was developed, tested and realized at Kola NPP. This technology consists of dissolving the salt residue and subsequent treatment by ozonization, separation of the deposits formed from ozonization and selective cleaning by ferro-cyanide sorbents. The nonactive salt solution goes to an industrial waste disposal site or a repository specially developed at NPP sites for 'exempt waste' products by IAEA classification. This technology was realized at Kola NPP in December 2006 year. At this time more than 1000 m 3 of decantates log time stored are treated. It allows solving very old problem to empty decantates' tanks at NPPs in environmentally safe manner and with high volume reduction factor. (authors)

  15. NPOESS Preparatory Project (NPP) Science Overview

    Science.gov (United States)

    Butler, James J.

    2011-01-01

    NPP Instruments are: (1) well understood thanks to instrument comprehensive test, characterization and calibration programs. (2) Government team ready for October 25 launch followed by instrument activation and Intensive Calibration/Validation (ICV). NPP Data Products preliminary work includes: (1) JPSS Center for Satellite Applications and Research (STAR) team ready to support NPP ICV and operational data products. (2) NASA NPP science team ready to support NPP ICV and EOS data continuity.

  16. Workflow in Almaraz NPP

    International Nuclear Information System (INIS)

    Gonzalez Crego, E.; Martin Lopez-Suevos, C.

    2000-01-01

    Almaraz NPP decided to incorporate Workflow into its information system in response to the need to provide exhaustive follow-up and monitoring of each phase of the different procedures it manages. Oracle's Workflow was chosen for this purpose and it was integrated with previously developed applications. The objectives to be met in the incorporation of Workflow were as follows: Strict monitoring of procedures and processes. Detection of bottlenecks in the flow of information. Notification of those affected by pending tasks. Flexible allocation of tasks to user groups. Improved monitoring of management procedures. Improved communication. Similarly, special care was taken to: Integrate workflow processes with existing control panels. Synchronize workflow with installation procedures. Ensure that the system reflects use of paper forms. At present the Corrective Maintenance Request module is being operated using Workflow and the Work Orders and Notice of Order modules are about to follow suit. (Author)

  17. Shock absorber in Ignalina NPP

    International Nuclear Information System (INIS)

    Bulavas, A.; Muralis, J.

    1996-09-01

    Theoretical calculation and experimental analysis of models of shock absorber in Ignalina NPP is presented. The results obtained from the investigation with model of shock absorber coincide with the theoretical calculation. (author). 2 figs., 3 refs

  18. Dukovany NPP - Safely 16 TERA

    International Nuclear Information System (INIS)

    Vlcek, J.

    2008-01-01

    In this presentation increasing of power output of the Dukovany NPP is reviewed. To operate all Dukovany Units safely with the perspective of long-term operation (LTO) of 50 - 60 years it is proposed.

  19. Selection of NPP for Kazakhstan

    International Nuclear Information System (INIS)

    Zhotabaev, Zh.R.

    2003-01-01

    Commercial NPP for Kazakhstan should to meet to several main requirements: 1). Safety operation (accident probability not more than 10 -6 1/p. year). 2). High efficiency > 40 %. 3). Possibility of use for high-temperature chemistry and hydrogen production. 4). Possibility for manufacturing of considerable part of equipment in Kazakhstan. 5). Possibility for fuel production and reprocessing in Kazakhstan. 6). Independence from existence of large water-supply sources. Comparative analysis of several NPP with different reactors (WWR-1000, Candu, BREST, VG-400; graphite molten salt reactor) shows that NPP with the graphite molten salt reactor meets to all above requirements, but hydrogen production it is possible by more complete 4-stage technology, since coolant temperature is 800 Deg. C. The principle advantage is possibility of manufacturing of main equipment and fuel in Kazakhstan that reduce the cost of NPP construction and operation

  20. Modernization programme at Dukovany NPP

    International Nuclear Information System (INIS)

    Trnka, M.

    2000-01-01

    The main goal of each NPP is to produce electricity safely, economically and without influence to environment. For Dukovany NPP it means to upgrade all documentation and perform the Equipment Upgrading Programme. All these activities are time and money consuming and therefore the determination of priority of all items was necessary. In the presentation there are mentioned some important changes in documentation, results of PSA studies and reason for Equipment Upgrading Programme performance. It was selected the most important item from the list of Equipment Upgrading Programme the I and C upgrading. Management has decided that Dukovany NPP will become among the best NPPs with WWER type of reactor. It seems this decision is the best way how to extend lifetime of the NPP. (author)

  1. Psychology of NPP operation safety

    International Nuclear Information System (INIS)

    Tret'yakov, V.P.

    1993-01-01

    The book is devoted to psychologic investigations into different aspects of NPP operative personnel activities. The whole set of conditions on which successful and accident-free personnel operation depends, is analysed. Based on original engineering and socio-psychologic investigations complex psychologic support for NPP personnel and a system of training and upkeep of operative personnel skills are developed. The methods proposed have undergone a practical examination and proved their efficiency. 154 refs., 12 figs., 9 tabs

  2. NPP Decommissioning: the concept; state of activities

    International Nuclear Information System (INIS)

    Nemytov, S.; Zimin, V.

    2001-01-01

    The main principles of NPP decommissioning concept in Russia are given. The conditions with fulfillment of works on NPP unit pre-decommissioning and decommissioning including: development of the normative documentation, creation of special fund for financing NPP decommissioning activities, deriving the Gosatomnadzor license for decommissioning of shut down NPP units, development of the equipment and technologies for waste and spent fuel management are presented. The decommissioning cost and labour intensity of one WWER-440 unit are shown. The practical works, executed on shut down units at Beloyarsk NPP (Unit1 and 2) and Novo Voronezh NPP (Unit 1 and 2) are outlined

  3. Spain in South Ukraine NPP

    International Nuclear Information System (INIS)

    Ibanez, M.

    1994-01-01

    A Technical Assistance Protocol was signed between the Governments of the GIS and the Commission of the European Union (CEU) on August 2, 1991 and this was the starting point of the TACIS program. In this article, the activities described are those related to the TACIS-92/93/94 on site technical assistance to South Ukraine NPP (SUK NPP). Within the scope of the TACIS 92 Program the CEU and the Ukrainian Authorities agreed a list of projects to be implemented at South Ukraine NPP with the aim to improve the operational safety of the plant. This part of the program is called TACIS 92 on-site activities. The total budget allocated to these projects is a MECU. The European Union ''utility'' selected to lead this program at South Ukraine NPP was UNESA and the first contract to cover our activities was signed in July 1993 between the CEU (Mr. Pablo Benavides) and UNESA (Mr. Pedro Rivero). The projects will be implemented at SUK NPP but according to the contract UNESA is ''The Consultant'' and GOSKOMATON (The Ukrainian Sate Committee on Nuclear Power Utilization) is the ''Recipient Institution''. (Author)

  4. Emergency preparedness at Ignalina NPP

    International Nuclear Information System (INIS)

    Kairys, A.

    1998-01-01

    Brief review of Ignalina NPP safety upgrading and personnel preparedness to act in cases of accidents is presented. Though great activities are performed in enhancing the plant operation safety, the Ignalina NPP management pays a lot of attention to preparedness for emergency elimination and take measures to stop emergency spreading. A new Ignalina NPP emergency preparedness plan was drawn up and became operational. It is the main document to carry out organizational, technical, medical, evacuation and other activities to protect plant personnel, population, the plant and the environment from accident consequences. Great assistance was rendered by Swedish experts in drawing this new emergency preparedness plan. The plan consists of 3 parts: general part, operative part and appendixes. The plan is applied to the Ignalina NPP personnel, Special and Fire Brigade and also to other contractor organizations personnel carrying out works at Ignalina NPP. There are set the following emergency classes: incident, emergency situation, alert, local emergency, general emergency. Separate intervention level corresponds to each emergency class. Overview of personnel training to act in case of an emergency is also presented

  5. Regulatory approach to NPP ageing in Bulgaria

    International Nuclear Information System (INIS)

    Vassilev, D.

    2000-01-01

    In this contribution summary information of Kozloduy NPP units is presented. The nuclear legislation, regulatory approach for managing safety aspects on NPP ageing, short term programme, complex programme PRG'97 ant other aspects of ageing management are discussed

  6. Some problems of NPP personnel training

    International Nuclear Information System (INIS)

    Vajshnis, P.P.; Kumkov, L.P.; Omel'chuk, V.V.

    1984-01-01

    Shortcomings of NPP personnel training are discussed. Development of full-scale training systems is necessary for qualitative training operative personnel. Primary problems that should be necessarily solved for ensuring effective training NPP personnel are considered

  7. We should use nuclear power plants as good as possible

    International Nuclear Information System (INIS)

    Kaplanova, J.

    2004-01-01

    In this paper visit of Austrian journalist Christian Hunger (redactor of the Austrian broadcast OE1) on the Jaslovske Bohunice NPP and Mochovce NPP is described. Upgrade of the Jaslovske Bohunice NPP and finishing of a building of the Mochovce NPP as well as shut-down of the first and second blocks of the Jaslovske Bohunice NPP are discussed

  8. Radiocarbon in the Atmosphere of the Žlkovce Monitoring Station of the Bohunice NPP: 25 Years of Continuous Monthly Measurements

    Czech Academy of Sciences Publication Activity Database

    Povinec, P.; Sivo, A.; Ješkovský, M.; Světlík, Ivo; Richtáriková, M.; Kaizer, J.

    2015-01-01

    Roč. 57, č. 3 (2015), s. 355-362 ISSN 0033-8222 Institutional support: RVO:61389005 Keywords : nuclear power plant s * C-14 * carbon-14 Subject RIV: BG - Nuclear , Atomic and Molecular Physics, Colliders Impact factor: 4.565, year: 2015

  9. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Kastchiev, G.

    1999-01-01

    Extensive review of the NPP Safety is presented including tasks of Ministry of Health, Ministry of Internal Affairs, Ministry of Environment and Waters, Ministry of Defense in the field of national system for monitoring the nuclear power. In the frame of national nuclear safety legislation Bulgaria is in the process of approximation of the national legislation to that of EC. Detailed analysis of the status of regulatory body, its functions, organisation structure, responsibilities and future tasks is included. Basis for establishing the system of regulatory inspections and safety enforcement as well as intensification of inspections is described. Assessment of safety modifications is concerned with complex program for reconstruction of Units 1-4 of Kozloduy NPP, as well as for modernisation of Units 5 and 6. Qualification and licensing of the NPP personnel, Year 2000 problem, priorities and the need of international assistance are mentioned

  10. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  11. Safety culture at Mochovce NPP

    International Nuclear Information System (INIS)

    Markus, Jozef; Feik, Karol

    2002-01-01

    This article presents the approach of Mochovce NPP to the Safety culture. It presents activities, which have been taken by Mochovce NPP up to date in the area of Safety culture enhancement with the aim of getting the term into the subconscious of each employee, and thus minimising the human factor impact on occurrence of operational events in all safety areas. The article furthermore presents the most essential information on how the elements characterising a continuous progress in reaching the planned Safety culture goals of the company management have been implemented at Mochovce NPP, as well as the management's efforts to get among the best nuclear power plant operators in this area and to be an example for the others. (author)

  12. Radioactive wastes management of NPP

    International Nuclear Information System (INIS)

    Klyuchnikov, A.A.; Pazukhin, Eh.M.; Shigera, Yu. M.; Shigera, V.Yu.

    2005-01-01

    Modern knowledge in the field of radiation waste management on example of the most serious man-made accident at Chernobyl NPP are illuminated. This nuclear power plant that after accident in 1986 became in definite aspect an experimental scientific ground, includes all variety of problems which have to be solved by NPP personnel and specialists from scientific organizations. This book is aimed for large sphere of readers. It will be useful for students, engineers, specialists and those working in the field of nuclear power, ionizing source and radiation technology use for acquiring modern experience in nuclear material management

  13. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  14. NPP Krsko secondary side analysis

    International Nuclear Information System (INIS)

    Fabijan, Lj.

    1987-01-01

    The purpose of this work is to analyze secondary side thermohydraulics response on steam generator tube plugging in order to ensure nominal NPP power. We had established that the additional opening of the governing valve No. 3 and 4 can compensate pressure drop caused by steam generator tube plugging. Two main steam flows with four governing valves were simulated. Steam expansion in turbine and feed water system was modeled separately. All important process point and steam moisture changes impact on nominal NPP power were analysed. (author)

  15. Mochovce NPP safety measures evaluation from point of view of operational safety enhancement

    International Nuclear Information System (INIS)

    Cillik, I.; Vrtik, L.

    2000-01-01

    Mochovce NPP consists of four reactor units of WWER 440/V213 type and it is located in the south-middle part of Slovakia. At present first unit operated and the second one under the construction finishing. As these units represent second generation of WWER reactor design, the additional safety measures (SM) were implemented to enhance operational and nuclear safety according to the recommendations of performed international audits and operational experience based on exploitation of other similar units (as Dukovany and J. Bohunice NPPs). These requirements result into a number of SMs grouped according to their purpose to reach recent international requirements on nuclear and operational safety. The paper presents the bases used for safety measures establishing including their grouping into the comprehensive tasks covering different areas of safety goals as well as structural organization of a project management of including participating companies and work performance. More, results are given regarding contribution of selected SMs to the total core damage frequency decreasing. (author)

  16. PSA analysis focused on Mochovce NPP safety measures evaluation from operational safety point of view

    International Nuclear Information System (INIS)

    Cillik, I.; Vrtik, L.

    2001-01-01

    Mochovce NPP consists of four reactor units of WWER 440/V213 type and it is located in the south-middle part of Slovakia. At present first unit operated and the second one under the construction finishing. As these units represent second generation of WWER reactor design, the additional safety measures (SM) were implemented to enhance operational and nuclear safety according to the recommendations of performed international audits and operational experience based on exploitation of other similar units (as Dukovany and J. Bohunice NPPs). These requirements result into a number of SMs grouped according to their purpose to reach recent international requirements on nuclear and operational safety. The paper presents the bases used for safety measures establishing including their grouping into the comprehensive tasks covering different areas of safety goals as well as structural organization of a project management of including participating companies and work performance. More, results are given regarding contribution of selected SMs to the total core damage frequency decreasing.(author)

  17. Safety aspects of NPP ageing

    International Nuclear Information System (INIS)

    1995-01-01

    Preparation of safety practices on assessment and management of aging of major NPP components important to safety, CRP on management of aging of concrete containment buildings, CRP on management of aging of in-containment instrumentation and control cables are outlined

  18. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  19. VUJE Trnava, Inc. - Engineering, Design and Research Organisation

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. This chapter contains information about VUJE: It consists of next parts: (1) From VUJE history (1977-2001); (2) Human resources (Development of staff; Structure of employees 1999); (3) VUJE activities: (Diagnostics; Nuclear safety; Radiation safety; Commissioning and operation; Personnel training; Information technology; Electric grids; Conventional power); (4) Significant projects of VUJE are presented: Gradual reconstruction with safety upgrading of the V1 Bohunice nuclear power plant; Modernization of the V2 Bohunice NPP; Completion of the Republic Repository of Radioactive Wastes in Mochovce; Decommissioning of the A1 NPP Bohunice; Development of simulators; Physical and power commissioning of NPPs; Construction of high voltage line Varin - Sucany

  20. Observation and modeling of NPP for Pinus elliottii plantation in subtropical China

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Based on the stem analysis of 59 individuals of Pinus elliottii in combination with tree biomass models, we calculated annual biomass increment of forest plots at Qianyanzhou Ecological Station, Chinese Academy of Sciences in subtropical China. In addition, canopy layer and community NPP were calcu- lated based on 12 years’ litter fall data. NPP of the 21-year-old forest was estimated by using the BIOME BGC model; and both measured NPP and estimated NPP were compared with flux data. Community biomass was 10574 g·m-2; its distribution patterns in tree layer, shrub layer, herbaceous layer, tree root, herbaceous and shrub roots and fine roots were 7542, 480, 239, 1810, 230, 274 and 239 g·m-2, respectively. From 1999 to 2004, the average annual growth rate and litter fall were 741 g·m-2·a-1 (381.31 gC·m-2·a-1) and 849 g·m?2·a?1 (463 gC·m-2·a-1), respectively. There was a significant corre- lation between annual litter fall and annual biomass increment; and the litter fall was 1.19 times the biomass increment of living trees. From 1985 to 2005, average NPP and GPP values based on BGC modeling were 630.88 (343.31 - 906.42 gC·m-2·a-1) and 1 800 gC·m-2·a-1 (1351.62 - 2318.26 gC·m-2·a-1). Regression analysis showed a linear relationship (R2=0.48) between the measured and simulated tree layer NPP values. NPP accounted for 30.2% (25.6%-32.9%) of GPP, while NEP ac- counted for 57.5% (48.1%-66.5%) of tree-layer NPP and 41.74% (37%-52%) of stand NPP. Soil respi- ration accounted for 77.0% of measured tree NPP and 55.9% of the measured stand NPP. NEE based on eddy covariance method was 12.97% higher than the observed NEP.

  1. ASSET experience at Paks NPP

    International Nuclear Information System (INIS)

    Szabo, I.

    1997-01-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones

  2. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  3. ASSET experience at Paks NPP

    Energy Technology Data Exchange (ETDEWEB)

    Szabo, I [Operational Safety Dept., Paks NPP, Paks (Hungary)

    1997-10-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones.

  4. Nuclear Fuel in Cofrentes NPP

    International Nuclear Information System (INIS)

    2002-01-01

    Fuel is an essential in the nuclear power generating business because of its direct implications on safety, generating costs and the operating conditions and limitations of the facility. Fuel management in Cofrentes NPP has been targeted at optimized operation, enhanced reliability and the search for an in-depth knowledge of the design and licensing processes that will provide Iberdrola,as the responsible operator, with access to independent control of safety aspects related to fuel and free access to manufacturing markets. (Author)

  5. NPP Krsko Living PSA Concept

    International Nuclear Information System (INIS)

    Vrbanic, I.; Spiler, J.

    2000-01-01

    NPP Krsko developed PSA model of internal and external initiators within the frame of the Individual Plant Examination (IPE) project. Within this project PSA model was used to examine the existing plant design features. In order to continue with use of this PSA model upon the completion of IPE in various risk-informed applications in support of plant operation and evaluations of design changes, an appropriate living PSA concept needed to be defined. The Living PSA concept is in NPP Krsko considered as being a set of activities pursued in order to update existing PSA model in a manner that it appropriately represents the plant design, operation practice and history. Only a PSA model which is being updated in this manner can serve as a platform for plant-specific risk informed applications. The NPP Krsko living PSA concept is based on the following major ponts. First, the baseline PSA model is defined, which is to be maintained and updated and which is to be reference point for any risk-informed application. Second, issues having a potential for impact on baseline PSA model are identified and procedure and responsibilities for their permanent monitoring and evaluation are established. Third, manner is defined in which consequential changes to baseline PSA model are implemented and controlled, together with associated responsibilities. Finally, the process is defined by which the existing version of baseline PSA model is superseded by a new one. Each time a new version of baseline PSA model is released, it would be re-quantified and the results evaluated and interpreted. By documenting these re-quantifications and evaluations of results in a sequence, the track is being kept of changes in long-term averaged risk perspective, represented by long-term averaged frequencies of core damage and pre-defined release categories. These major topics of NPP Krsko living PSA concept are presented and discussed in the paper. (author)

  6. Welding facilities for NPP assembling

    International Nuclear Information System (INIS)

    Rojtenberg, S.S.

    1987-01-01

    Recommendations concerning the choice of equipment for welding in pre-assembling work shops, in the enlarging assembling shops and at the assembling site, are given. Advanced production automatic welders and semiautomatic machines, applied during the NPP equipment assembling as well as automatic machines specially produced for welding the main reactor components and pipelines are described. Automatic and semiautomatic machine and manual welding post supply sources are considered

  7. New approach of second Romanian NPP siting

    International Nuclear Information System (INIS)

    Mauna, Traian

    2010-01-01

    The NPP sitting studies in Romania began before 1975. The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units. Gained the experience from Cernavoda NPP sitting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the NPP Cernavoda project to the new parameters of close water cooling circuit and hard less and no rock foundation strata. The studies were carrying out in different stages on the inner rivers Olt, Mures, Somes in Transylvania historical region. This paper tries to reconsider shortly the old analysis according to the last IAEA Safety Standards, taking into account the new NPP generation requirement. Paper is focused on geological aspects and other local sites characteristics. (authors)

  8. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  9. On the NPP structural reliability

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    Reviewed are the main statements peculiarities and possibilities of the first branch guiding technical material (GTM) ''The methods of calculation of structural reliability of NPP and its systems at the stage of projecting''. It is stated, that in GTM presented are recomendations on the calculation of reliability of such specific systems, as the system of the reactor control and protection the system of measuring instruments and automatics and safe systems. GTM are based on analytical methods of modern theory of realibility with the Use of metodology of minimal cross sections of complex systems. It is stressed, that the calculations on the proposed methods permit to calculate a wide complex of reliability parameters, reflecting separately or together prorerties of NPP dependability and maintainability. For NPP, operating by a variable schedule of leading, aditionally considered are parameters, characterizing reliability with account of the proposed regime of power change, i.e. taking into account failures, caused by decrease of the obtained power lower, than the reguired or increase of the required power higher, than the obtained

  10. Determining the contributions of urbanisation and climate change to NPP variations over the last decade in the Yangtze River Delta, China.

    Science.gov (United States)

    Wu, Shaohua; Zhou, Shenglu; Chen, Dongxiang; Wei, Zongqiang; Dai, Liang; Li, Xingong

    2014-02-15

    Terrestrial net primary production (NPP) is an important measure of global change, and identifying the relative contributions of urbanisation and climate change to NPP is important for understanding the impact of human and natural influences on terrestrial systems and the carbon cycle. The objective of this study was to reveal how urbanisation and climate drive changes in NPP. Satellite-based estimates of NPP collected over a 12-year period (1999-2010) were analysed to identify NPP variations in the Yangtze River Delta. Temporal and spatial analysis methods were used to identify the relationships among NPP, nighttime light urbanisation index values, and climatic factors from pixel to regional scales. The NPP of the entire Yangtze River Delta decreased slightly at a rate of -0.5 g C m(-2)a(-1) from 1999 to 2010, but this change was not significant. However, in the urban region, NPP decreased significantly (pclimate change to NPP variation. The results revealed that the urbanisation factor is the main driving force for NPP change in high-speed urbanisation areas, and the factor accounted for 47% of the variations. However, in the forest and farm regions, the NPP variation was mainly controlled by climate change and residual factors. Copyright © 2013 Elsevier B.V. All rights reserved.

  11. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  12. Ignalina NPP: living and working conditions

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The conference was devoted to discuss the social problems related with the operation of Ignalina NPP. The main topics are the following: analysis of public opinion of surrounding region of Ignalina NPP including neighbouring Daugavpils district in Latvia, environment impact evaluation of Daugavpils district, assessment of the influence of Ignalina NPP operation to the development of business in the region, investigation of problems of Visaginas town - residence of Ignalina NPP personnel. The specificity of Visaginas (former Sniechkus) is defined by the majority of non-native Lithuanians living there. Cultural transformation and political organization of the region were surveyed as well

  13. Radiation monitoring in the NPP environment, control of radioactivity in NPP-environment system

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1987-01-01

    Problems of radiation monitoring and control of the NPP-environment system (NPPES) are considered. Radiation control system at the NPP and in the environment provides for the control of the NPP, considered as the source of radioactive releases in the environment and for the environmental radiation climate control. It is shown, that the radiation control of the NPP-environment system must be based on the ecological normalization principles of the NPP environmental impacts. Ecological normalization should be individual for the NPP region of each ecosystem. The necessity to organize and conduct radiation ecological monitoring in the NPP regions is pointed out. Radiation ecological monitoring will provide for both environmental current radiation control and information for mathematical models, used in the NPPES radiation control

  14. Cernavoda NPP simulator - next generation

    International Nuclear Information System (INIS)

    Tatar, F.; Ionescu, T.; Dascalu, M.

    2003-01-01

    Demand for extending the amount of training and scope for Cernavoda Unit 1 as well as the new trend in the simulator owners world, led to a change in the Romanian philosophy of simulator specification. Up to now the training was conducted on a Full Scope simulator, a 1:1 replica of Cernavoda Unit 1 reference plant. The present task is to define the simulation facilities and structure capable to meet the requirements for training, qualification and licensing of personnel for both Cernavoda Unit 1 and Unit 2. Obviously, the Cernavoda Unit 2 belongs to the same technological family but has rather different control room layout. Since this target requires a new simulator the costs would be rather high in accordance to the degree of automation of Cernavoda NPP. Therefore, depending on training requirements and financing, the Cernavoda Unit 1 simulator modernization, which also provides an alternative to full scope control room simulator, may be a viable option. Therefore the solution that with discuss for Cernavoda training extension is the migration of Cernavoda Unit 1 simulator to state-of-the-art. Consequently, the Cernavoda Unit 1 simulator modernization task will be organized as project including the following major items: 1. Rehost existing U1 simulation software from VAX 4500 to: - Best commercial multi-processor server for simulation server (HP, O/S Linux); - Best commercial single processor PC for I/O communications (HP, O/S Linux); 2. Replace DCC with enhanced emulated version: Best commercial individual PC for DCC emulation (HP, O/S Windows); Support for actual keyboards; Replacement of RAMTEK System and CONRAC Monitors with X terminals or PC's; 3. Conversion of AutoCAD-based panel graphic pages to RAVE-based; 4. Install the required software tools for developing enhanced simulation modules; 5. Replace the simulation modules with advanced modules; 6. Replace the present Windows Instructor Facilities with ISIS; 7. Development of a selection of MCR-U1 virtual

  15. Display systems for NPP control

    International Nuclear Information System (INIS)

    Rozov, S.S.

    1988-01-01

    Main trends in development of display systems used as the means for image displaying in NPP control systems are considered. It is shown that colour display devices appear to be the most universal means for concentrated data presentation. Along with digital means the display systems provide for high-speed response, sufficient for operative control of executive mechanisms. A conclusion is drawn that further development of display systems will move towards creation of large colour fields (on reflection base or with multicolour gas-discharge elements)

  16. Emergency preparedness at Barsebaeck NPP in Sweden

    International Nuclear Information System (INIS)

    Olsson, R.; Lindvall, C.

    1998-01-01

    On-site emergency preparedness plan at Barsebaeck NPP is presented. In an emergency the responsibility of the NPP is to alarm the emergency organizations, spend all efforts to restore safe operation, assess the potential source term as to size and time, protect their own personnel, inform personnel and public. Detailed emergency procedures overview is provided

  17. Safety culture in Ignalina NPP, regulatory view

    Energy Technology Data Exchange (ETDEWEB)

    Maksimovas, G [VATESI (Lithuania)

    1997-09-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP.

  18. Safety culture in Ignalina NPP, regulatory view

    International Nuclear Information System (INIS)

    Maksimovas, G.

    1997-01-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP

  19. Constructive approaches to the space NPP designing

    International Nuclear Information System (INIS)

    Eremin, A.G.; Korobkov, L.S.; Matveev, A.V.; Trukhanov, Yu.L.; Pyshko, A.P.

    2000-01-01

    An example of designing a space NPP intended for power supply of telecommunication satellite is considered. It is shown that the designing approach based on the introduction of a leading criterion and dividing the design problems in two independent groups (reactor with radiation shield and equipment module) permits to develop the optimal design of a space NPP [ru

  20. Chernobyl NPP accident. Overcoming experience. Acquired lessons

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    This book is devoted to the 20 anniversary of accident on the Chernobyl NPP unit 4. History of construction, causes of the accident and its consequences, actions for its mitigation are described. Modern situation with Chernobyl NPP decommissioning and transferring of 'Ukryttya' shelter into ecologically safe system are mentioned. The future of Chernobyl site and exclusion zone was discussed

  1. Seismic characterization of the NPP Krsko site

    International Nuclear Information System (INIS)

    Obreza, J.

    2000-01-01

    The goal of NPP Krsko PSA Project Update was the inclusion of plant changes (i.e. configuration/operational related) through the period January 1, 1993 till the OUTAGE99 (April 1999) into the integrated Internal/External Level 1/Level 2 NPP Krsko PSA RISK SPECTRUM model. NPP Krsko is located on seismotectonic plate. Highest earthquake was recorded in 1917 with magnitude 5.8 at a distance of 7-9 km. Site (founded) on Pliocene sediments which are as deep as several hundred meters. No surface faulting at the Krsko site has been observed and thus it is not to be expected. NPP Krsko is equipped with seismic instrumentation, which allows it to complete OBE (SSE). The seismic PSA successfully showed high seismic margin at Krsko plant. NPP Krsko seismic design is based on US regulations and standards

  2. Radiation supervision - NPPs A-1, V-1, V-2

    International Nuclear Information System (INIS)

    2000-01-01

    In this leaflet the radiation supervision of the nuclear power plants A-1, V-1, V-2 is presented. Off-site radiation supervision laboratory is a part of monitoring scheme of the NPPs. More than 1150 samples are taken from the environment annually. The tele-dosimetric system was constructed to improve the quality of the Bohunice NPPs operation impacts supervision. It has been running in a continuous operation from 1992 and providing supervision of the nuclear power plant off-site area within 25 kilometres. The tele-dosimetric system is described

  3. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  4. The primary circuit materials properties results analysis performed on archive material used in NPP V-1 and Kola NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L.; Beno, P. [Nuclear Power Plants Research Institute Inc., Trnava (Slovakia)

    1997-04-01

    A very brief summary is provided of a primary circuit piping material properties analysis. The analysis was performed for the Bohunice V-1 reactor and the Kola-1 and -2 reactors. Assessment was performed on Bohunice V-1 archive materials and primary piping material cut from the Kola units after 100,000 hours of operation. Main research program tasks included analysis of mechanical properties, corrosion stability, and microstructural properties. Analysis results are not provided.

  5. Does climate directly influence NPP globally?

    Science.gov (United States)

    Chu, Chengjin; Bartlett, Megan; Wang, Youshi; He, Fangliang; Weiner, Jacob; Chave, Jérôme; Sack, Lawren

    2016-01-01

    The need for rigorous analyses of climate impacts has never been more crucial. Current textbooks state that climate directly influences ecosystem annual net primary productivity (NPP), emphasizing the urgent need to monitor the impacts of climate change. A recent paper challenged this consensus, arguing, based on an analysis of NPP for 1247 woody plant communities across global climate gradients, that temperature and precipitation have negligible direct effects on NPP and only perhaps have indirect effects by constraining total stand biomass (Mtot ) and stand age (a). The authors of that study concluded that the length of the growing season (lgs ) might have a minor influence on NPP, an effect they considered not to be directly related to climate. In this article, we describe flaws that affected that study's conclusions and present novel analyses to disentangle the effects of stand variables and climate in determining NPP. We re-analyzed the same database to partition the direct and indirect effects of climate on NPP, using three approaches: maximum-likelihood model selection, independent-effects analysis, and structural equation modeling. These new analyses showed that about half of the global variation in NPP could be explained by Mtot combined with climate variables and supported strong and direct influences of climate independently of Mtot , both for NPP and for net biomass change averaged across the known lifetime of the stands (ABC = average biomass change). We show that lgs is an important climate variable, intrinsically correlated with, and contributing to mean annual temperature and precipitation (Tann and Pann ), all important climatic drivers of NPP. Our analyses provide guidance for statistical and mechanistic analyses of climate drivers of ecosystem processes for predictive modeling and provide novel evidence supporting the strong, direct role of climate in determining vegetation productivity at the global scale. © 2015 John Wiley & Sons Ltd.

  6. Study on human factor at NPP

    International Nuclear Information System (INIS)

    Nopp, I.

    1984-01-01

    Factors affecting the reliabilty of the reactor control by an NPP operator are considered on the base of the Czechoslovakia NPP operating experience. The reliability level of NPP operators depends on objective factors (conditions and regime of labour) determining the labour productivity and on subjective ones (psychological morale, physical and mental abilities and occupational level of personnel). Problems of the effect of physical and mental abilities and professional level on the reliability of personnel are considered to be the most important ones. The effect of individual abilities and specific features of the human body on changes in his occupational abilities can be estimated only to a certain degree

  7. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  8. A brief overview of Ignalina NPP safety issues

    International Nuclear Information System (INIS)

    Almenas, K.; Ushpuras, E.

    1998-01-01

    A description of the safety of Ignalina NPP in a very popular form is presented. Answers to the most frequently recurring questions concerning the Ignalina NPP are provided based on recently completed international studies. Questions are like these: can a similar accident to the one that occurred in Chernobyl take place at Ignalina NPP, does the Ignalina NPP have a containment, what are the probabilities and potential consequences of accidents, etc. The brochure contains a short description of Ignalina NPP safety improvement programs

  9. Krsko NPP radioactive waste characteristics

    International Nuclear Information System (INIS)

    Skanata, D.; Kroselj, V.; Jankovic, M.

    2007-01-01

    In May 2005 Krsko NPP initiated the Radioactive Waste Characterization Project and commissioned its realization to the consulting company Enconet International, Zagreb. The Agency for Radwaste Management was invited to participate on the Project. The Project was successfully closed out in August 2006. The main Project goal consisted of systematization the existing and gathering the missing radiological, chemical, physical, mechanical, thermal and biological information and data on radioactive waste. In a general perspective, the Project may also be considered as a part of broader scope of activities to support state efforts to find a disposal solution for radioactive waste in Slovenia. The operational low and intermediate level radioactive waste has been structured into 6 waste streams that contain evaporator concentrates and tank sludges, spent ion resins, spent filters, compressible and non-compressible waste as well as specific waste. For each of mentioned waste streams, process schemes have been developed including raw waste, treatment and conditioning technologies, waste forms, containers and waste packages. In the paper the main results of the Characterization Project will be briefly described. The results will indicate that there are 17 different types of raw waste that have been processed by applying 9 treatment/conditioning technologies. By this way 18 different waste forms have been produced and stored into 3 types of containers. Within each type of container several combinations should be distinguished. Considering all of this, there are 34 different types of waste packages altogether that are currently stored in the Solid Radwaste Storage Facility at the Krsko NPP site. Because of these findings a new identification system has been recommended and consequently the improvement of the existing database on radioactive waste has been proposed. The potential areas of further in depth characterization are indicated. In the paper a brief description on the

  10. Experience from replacement and check of thermocouples during reconstruction of in-reactor temperature measurements at Bohunice V-1 units 1 and 2

    International Nuclear Information System (INIS)

    Slanina, M.; Stanc, J.

    2001-01-01

    Replacement of thermocouples in the protection tube blocks was a key phase of the reconstruction of in-reactor temperature measurements at Bohunice V-1 with regard to the success, reliability and impact on safety of unit operation. The replacement consisted of reliable and safe withdrawal of 216 old thermocouples, their disposal and installation of new thermocouples into dry channels. In the material presented, this phase of reconstruction is described in details, with focus on the evaluation of replacement quality and check activities carried out at the new installed thermocouples. (Authors)

  11. Results of physics start-up tests of Mochovce and Bohunice units with 2-nd generation Gd fuel (average enrichment 4.87 %)

    International Nuclear Information System (INIS)

    Polakovic, F.

    2015-01-01

    There are presented main features of the fuel and the list of experimental neutron-physical characteristics measured during physics start-up tests.All together there were carried out 14 physics start-ups at Bohunice and Mochovce Units with the new type of fuel. Differences between theoretical and experimental neutron-physical characteristics were statistically processed and compared with the tests acceptance criteria. There are summarized results of reactor physics start-ups with 2-nd generation Gd fuel usage [ru

  12. Application of control computer system TESLA RPP-16 in the Bohunice nuclear power plant

    International Nuclear Information System (INIS)

    Spetko, V.

    1976-01-01

    The reasons are given for the installation of a computer at the A-1 nuclear power plant in Czechoslovakia with regard to applied research. The configuration, placement, and software of the computer system is described. The programmes are written in the SAM and FORTRAN-IV languages. The knowledge acquired in the course of tests and the prospect of the future installation of computer control equipment in the A-1 nuclear power plant are described. (J.P.)

  13. Treatment of NPP wastes using vitrification

    International Nuclear Information System (INIS)

    Sobolev, I.A.; Lifanov, F.A.; Stefanovsky, S.V.; Kobelev, A.P.; Savkin, A.E.; Kornev, V.I.

    1998-01-01

    Glass-based materials to immobilize various liquid and solid radioactive wastes generated at nuclear power plants (NPP) were designed. Glassy waste forms can be produced using electric melting including a cold crucible melting. Leach rate of cesium was found to be 10 -5 -10 -6 g/(cm 2 day) (IAEA technique). Volume reduction factor after vitrification reached 4-5. Various technologies for NPP waste vitrification were developed. Direct vitrification means feeding of source waste into the melter with formation of glassy waste form to be disposed. Joule heated ceramic melter, and cold crucible were tested. Process variables at treatment of Kursk, Chernobyl (RBMK), Kalinin, Novovoronezh (VVER) NPP wastes were determined. The most promising melter was found to be the cold crucible. Pilot plant based on the cold crucibles has been designed and constructed. Solid burnable NPP wastes are incinerated and slags are incorporated in glass. (author)

  14. Environmental impact assessment of NPP decommissioning

    International Nuclear Information System (INIS)

    Hinca, R.

    2009-01-01

    In this presentation the following potential impacts of decommissioning of NPP are discussed: - Impacts on population; Impacts on natural environment; Land impacts; Impacts on urban complex and land utilisation; Possible impacts on area as a result of failure.

  15. Radiation ecological monitoring in NPP region

    International Nuclear Information System (INIS)

    Egorov, Yu.A.; Kazakov, S.V.

    1985-01-01

    The known principle of sanitary-hygienic regulation of NPP radiation effect on man and environment is analyzed. An ecological approach is required to optimize NPP relations with the environment and to regulate radioactivity of the NPP - environment system. The ecological approach envisages the development of standards of permissible concentrations of radioactive and chemical substances (as well as heat) in natural environment, taking into account their synergism, corresponding to ecologically permissible response reactions of biota to their effect. The ecological approach also comprises the sanitary-hygienic principle of radiation protection of man. Attention is paid to ecological monitoring in NPP region, comprising consideration of factors, affecting the environment, evaluation of the actual state of the environment, prediction of the environmental state, evaluation of the expected environmental state

  16. NPP operation and modern high technologies

    International Nuclear Information System (INIS)

    Kuznetsov, V.V.

    1992-01-01

    Examples are considered of modern high technology introduction into daily practice of NPP operation, namely: satellite communication systems, robots, non-destructive testing, optical-fiber techniques, laser measuring means and others

  17. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  18. Nuclear Power Plant (NPP) safety in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    The multidisciplinary aspects of the activities involved in the nuclear power plant (NPP) licensing, are presented. The activities of CNEN's technical staff in the licensing of Angra-1 and Angra-2 power plants are shown. (E.G.) [pt

  19. Cuba: Juragua NPP. Project Control. Annex 5

    International Nuclear Information System (INIS)

    Serradet, M.A.

    1999-01-01

    This annex deals with project control. The long suspension of Juragua NPP has affected personnel, equipment and site structures. Efforts are being made to revive the plant and to protect existing resources (assets). An action plan has been prepared. (author)

  20. Training human resource for NPP in Vietnam

    International Nuclear Information System (INIS)

    Nguyen, Trung Tinh; Dam, Xuan Hiep

    2008-01-01

    Vietnam will establish the first NPP in the near future. With us the first important thing is the human resource, but now there is no university in Vietnam training nuclear engineers. In EPU (Electric Power University), now we are preparing for training nuclear engineers. In this paper, we review the nuclear man power and the way to train the high quality human resource for NPP and for other nuclear application in Vietnam. (author)

  1. Ignalina NPP Safety Analysis: Models and Results

    International Nuclear Information System (INIS)

    Uspuras, E.

    1999-01-01

    Research directions, linked to safety assessment of the Ignalina NPP, of the scientific safety analysis group are presented: Thermal-hydraulic analysis of accidents and operational transients; Thermal-hydraulic assessment of Ignalina NPP Accident Localization System and other compartments; Structural analysis of plant components, piping and other parts of Main Circulation Circuit; Assessment of RBMK-1500 reactor core and other. Models and main works carried out last year are described. (author)

  2. Radionuclide localization at the Chernobyl' NPP territory

    International Nuclear Information System (INIS)

    Mamaev, L.A.; Galkin, G.A.; Khrabrov, S.L.; Polyakov, A.S.; Mikhejkin, S.V.

    1989-01-01

    Experience is generalized of using different dust suppression (DS) compounds during Chernobyl' accident consequence elimination. Polymer DS compounds were used at the NPP operating site; the compounds kept dust-like radioactive contaminations during 1-2 months. DS at the country was realized by means of the compound on base of latex. The conclusion is made that the DS measures improved radiation situation in the NPP zone. 7 refs

  3. Knowledge Management and Organizational Proficiency with NPP

    International Nuclear Information System (INIS)

    Marler, M.

    2016-01-01

    Full text: The pace of new NPP construction, startup, and operation is straining the supply of proficient operators, technicians, and engineers. This technical brief explains an approach implemented by a US nuclear utility to capture and transfer knowledge possessed by proficient workers to new workers using the VISION learning content management system. This approach could also be used to accelerate worker proficiency in new NPP organizations. (author

  4. Suomi NPP Ground System Performance

    Science.gov (United States)

    Grant, K. D.; Bergeron, C.

    2013-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). JPSS will replace the afternoon orbit component and ground processing system of the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA. The JPSS satellites will carry a suite of sensors designed to collect meteorological, oceanographic, climatological and geophysical observations of the Earth. The first satellite in the JPSS constellation, known as the Suomi National Polar-orbiting Partnership (Suomi NPP) satellite, was launched on 28 October 2011, and is currently undergoing product calibration and validation activities. As products reach a beta level of maturity, they are made available to the community through NOAA's Comprehensive Large Array-data Stewardship System (CLASS). CGS's data processing capability processes the satellite data from the Joint Polar Satellite System satellites to provide environmental data products (including Sensor Data Records (SDRs) and Environmental Data Records (EDRs)) to NOAA and Department of Defense (DoD) processing centers operated by the United States government. CGS is currently processing and delivering SDRs and EDRs for Suomi NPP and will continue through the lifetime of the Joint Polar Satellite System programs. Following the launch and sensor activation phase of the Suomi NPP mission, full volume data traffic is now flowing from the satellite through CGS's C3, data processing, and data delivery systems. Ground system performance is critical for this operational system. As part of early system checkout, Raytheon measured all aspects of data acquisition, routing, processing, and delivery to ensure operational performance requirements are met, and will continue to be met throughout the mission. Raytheon developed a tool to measure, categorize, and

  5. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  6. Decommissioning Study of Oskarshamn NPP

    International Nuclear Information System (INIS)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  7. Decommissioning study of Forsmark NPP

    International Nuclear Information System (INIS)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  8. ORSEC technological risks, Blayais NPP

    International Nuclear Information System (INIS)

    2016-01-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Blayais NPP (Gironde, France)

  9. Decommissioning Study of Oskarshamn NPP

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  10. Decommissioning study of Forsmark NPP

    Energy Technology Data Exchange (ETDEWEB)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  11. Changing NPP consumption patterns in the Holocene: from Megafauna "liberated" NPP to "ecological bankruptcy"

    Science.gov (United States)

    Doughty, C.

    2015-12-01

    There have been vast changes in how net primary production (NPP) is consumed by humans and animals during the Holocene beginning with a potential increase in availability following the Pleistocene megafauna extinctions. This was followed by the development of agriculture which began to gradually restrict availability of NPP for wild animals. Finally, humans entered the industrial era using non-plant based energies to power societies. Here I ask the following questions about these three energy transitions: 1. How much NPP energy may have become available following the megafauna extinctions? 2. When did humans, through agriculture and domestic animals, consume more NPP than wild mammals in each country? 3. When did humans and wild mammals use more energy than was available in total NPP in each country? To answer this last question I calculate NPP consumed by wild animals, crops, livestock, and energy use (all converted to units of MJ) and compare this with the total potential NPP (also in MJ) for each country. We develop the term "ecological bankruptcy" to refer to the level of consumption where not all energy needs can be met by the country's NPP. Currently, 82 countries and a net population of 5.4 billion are in the state of ecologically bankruptcy, crossing this threshold at various times over the past 40 years. By contrast, only 52 countries with a net population of 1.2 billion remain ecologically solvent. Overall, the Holocene has seen remarkable changes in consumption patterns of NPP, passing through three distinct phases. Humans began in a world where there was 1.6-4.1% unclaimed NPP to consume. From 1700-1850, humans began to consume more than wild animals (globally averaged). At present, >82% of people live in countries where not even all available plant matter could satisfy our energy demands.

  12. Automatic control system at the ''Loviisa'' NPP

    International Nuclear Information System (INIS)

    Kukhtevich, I.V.; Mal'tsev, B.K.; Sergievskaya, E.N.

    1980-01-01

    Automatic control system of the Loviisa-1 NPP (Finland) is described. According to operation conditions of Finland power system the Loviisa-1 NPP must operate in the mode of week and day control of loading schedule and participate in current control of power system frequency and capacity. With provision for these requirements NPP is equipped with the all-regime system for automatic control functioning during reactor start-up, shut-down, in normal and transient regimes and in emergency situations. The automatic control system includes: a data subsystem, an automatic control subsystem, a discrete control subsystem including remote, a subsystem for reactor control and protection and overall station system of protections: control and dosimetry inside the reactor. Structures of a data-computer complex, discrete control subsystems, reactor control and protection systems, neutron flux control system, inside-reactor control system, station protection system and system for control of fuel element tightness are presented in short. Two-year experience of the NPP operation confirmed advisability of the chosen volume of automatization. The Loviisa-1 NPP operates successfully in the mode of the week and day control of supervisor schedule and current control of frequency (short-term control)

  13. Environmental impact of the NPP Krsko

    International Nuclear Information System (INIS)

    Novosel, N.

    1996-01-01

    The Ministry of Economic Affairs has for six years now been monitoring the operation of the Krsko NPP (NEK) and its impact on the environment. A bulletin titled 'NEK - Energy and Environment' is being issued every three months. It contains information on operation of the Krsko NPP for the previous three months, a graph of duration of temperature increase of water in the Sava river (delta T) in that period, an assessment of the radiological impact of Krsko NPP on the environment through an equivalent dose cumulatively throughout the calendar year, and a short current text related to Krsko NPP. The Ministry of Economic Affairs organizes a press conference on every issue of the bulletin, as an attempt of introducing this subject to the media and to the public. This paper contains a review of information given in the NEK bulletin from 1990 to 1995 with a special emphasis on the contribution of the Krsko NPP to the artificially caused radiation on the border between the Republic of croatia and the Republic of Slovenia. (author)

  14. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  15. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  16. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  17. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4G. Paks NPP: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    related to different structures or systems of Paks NPP and Kozloduy NPP Unit 5/6 and experience data (previous laboratory results or earthquake experience) for WWER type NPPs. The reports from the CRP participants have been compiled in volumes of IAEA Working Material grouped under five broad categories. This volume covers the following subjects: structural response of Paks NPP; Evaluation of seismic resistance of low voltage switchgear, Bohunice V1 NPP; final report of the seismic investigations at Paks NPP; report on vibration test of the scale worm tank model; plan of shaking table test of worm tank model; dynamic response of the Paks NPP chimney; vibration analysis of the Paks NPP stacks; functionality of WWER electrical, instrumentation and control components; dynamic analysis of Paks reactor building structures; and computational-experimental examination and ensuring of equipment and pipelines seismic resistance at starting and operation WWER type NPPs

  18. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  19. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Stuller, J.; Brandejs, P.; Miasnikov, A.; Svab, M.

    1999-01-01

    In beginning, a history of legislative process regulating industrial utilisation of nuclear energy is given, including detailed list of decrees issued by the first regulatory body supervising Czech nuclear installations - Czechoslovak Atomic Energy Commission (CSKAE). Current status of nuclear regulations and radiation protection, especially in connection with Atomic Act (Act No 18/1997 Coll.), is described. The Atomic Act transfers into the Czech legal system a number of obligations following from the Vienna Convention on Civil Liability for Nuclear Damage and Joint Protocol relating to the Application of the Vienna and Paris Convention, to which the Czech Republic had acceded. Actual duties and competence of current nuclear regulatory body - State Office for Nuclear Safety (SUJB) - are given in detail. Execution of the State supervision of peaceful utilisation of nuclear energy and ionising radiation is laid out in several articles of the Act, which comprises: control activities of the SUJB, remedial measures, penalties. Material and human resources are sufficient for fulfilment of the basic functions for which SUJB is authorised by the law. For 1998, the SUJB allotted staff of 149, approximately 2/3 of that number are nuclear safety and radiation protection inspectors. The SUJB budget for 1998 is approximately 180 million Czech crowns (roughly 6 million US dollars). Inspection activity of SUJB is carried out in three different ways: routine inspections, planned specialised inspections, inspections as a response to a certain situation (ad-hoc inspections). Approach to the licensing of major plant upgrades and backfittings are mainly illustrated on the Temelin NPP licensing. Regulatory position and practices concerning review activities are presented. (author)

  20. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  1. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  2. New trends in designing NPP control boards

    International Nuclear Information System (INIS)

    Kondrat'ev, V.V.

    1981-01-01

    A short analytical summary of the latest developments and future trends in designing NPP control boards is given. The designs of the Westinghause and the Hynkley-Point NPP control boards are described in detail. The essence of the advanced control board concept consists , firstly, in expanded use of computer-controlled displays for the sake of reducing the content of unimportant information presented to an operator, and, secondary, in better account of human possibilities to convert the NPP operation information into a more suitable form. An enlarged use of the direct digital reactor control utilizing microprocessors is expected. Besides, the employment of full-scale control board mock-ups and information desks as well as testing newly-developed control boards at computer reactor simulators are concluded to be used at all-growing rate [ru

  3. Qinshan NPP large break LOCA safety analysis

    International Nuclear Information System (INIS)

    Shi Guobao; Tang Jiahuan; Zhou Quanfu; Wang Yangding

    1997-01-01

    Qinshan NPP is the first nuclear power plant in the mainland of China, a 300 MW(e) two-loop PWR. Large break LOCA is the design-basis accident of Qinshan NPP. Based on available computer codes, the own analysis method which complies with Appendix k of 10 CFR 50 has been established. The RELAP4/MOD7 code is employed for the calculations of blowdown, refill and reflood phase of the RCS respectively. The CONTEMPT-LT/028 code is used for the containment pressure and temperature analysis. The temperature transient in the hot rod is calculated using the FRAP-6T code. Conservative initial and functional assumptions were adopted during Qinshan NPP large break LOCA analysis. The results of the analysis show the applicable acceptance criteria for the loss-of-coolant accident are met

  4. Safeguards at Kozloduy NPP - Experience and expectations

    International Nuclear Information System (INIS)

    Elenkov, Todor

    2001-01-01

    Bulgaria is a party of Non Proliferation Treaty since 5 September 1969. The agreement between IAEA and Bulgaria - INFCIRC 178 - has been in force since 29 February 1972. At that time Bulgaria had one research reactor IRT-2000 in Sofia and two power reactors of WWER-440 type under construction. Now at Kozloduy NPP site there are 4 facilities, which consist of 4 WWER-440 and 2 WWER-1000 type power reactors, producing almost 50% of the electricity in Bulgaria and 1 wet away from reactor spent fuel storage. In 1991 under the green movements and social pressure, the research reactor in Sofia was closed and the construction of the second NPP in Belene with 2 WWER-1000 type reactors was halted. After the transfer in 1994 of the fresh fuel from the research reactor to Kozloduy due to security reasons practically NPP Kozloduy remains the only significant (from safeguards point of view) nuclear site in Bulgaria. In 1972 a 'Nuclear Fuel' group was formed at the Physicists Department in NPP Kozloduy with responsibilities to carry out for safeguards records and reports, fresh and spent fuel transport and control. In 1990 this group was transferred to the Safety Section and since 1992 it exists as 'Control and Accounting for of the Nuclear Materials' - a section in the Safety Department. Currently the section serves all four facilities in NPP Kozloduy and has four people: section head, chief inspector and two inspectors. The main activities of the section include: a) Control of the nuclear fuel location as well as meeting the storage and transport conditions regulations; b) Control of the conditions for normal operations of the installed IAEA surveillance systems; c) Preparation of documents for licensing of fresh and spent nuclear fuel transport; d) Preparation of the official information on nuclear materials location and quantity; e) Preparation of accounting records and the reports for IAEA (ICR, PIL, MBR); f) Co-ordination of the IAEA safeguards inspection activities at NPP

  5. Reactor plant for Belene NPP completion

    International Nuclear Information System (INIS)

    Dragunov, Yu. G.; Ryzhov, S. B.; Ermakov, D. N.; Repin, A. I.

    2004-01-01

    Construction of 'Belene' NPP was started at the end of 80-ties using project U-87 with V-320 reactor plant, general designer of this plant is OKB 'Gidropress'. At the beginning of 90-ties, on completing the considerable number of deliveries and performance of civil engineering work at the site the NPP construction was suspended. Nowadays, considering the state of affairs at the site and the work performed by Bulgarian Party on preservation of the equipment delivered, the most perspective is supposed to be implementation of the following versions in completing 'Belene' NPP: for completion of Unit 1 - reactor plant VVER-1000 on the basis of V-320 reactor with the maximum use of the delivered equipment (V-320M) having the extended service life and safety improvement; for Unit 2 - advanced reactor plant VVER-1000. For the upgraded reactor plant V-230M the basic solutions and characteristics are presented, as well as the calculated justification of strength and safety analyses, design of the reactor core and fuel cycle, instrumentation and control systems, application of the 'leak-before break' in the project and implementation of safety measures. For the modernised reactor plant V-392M the main characteristics and basic changes are presented, concerning reactor pressure vessel, steam generator, reactor coolant pump set. Design of NPP with the modernized reactor plant V-320M meets the up-to-date requirements and can be licensed for completion and operation. In the design of NPP with the advanced reactor plant the basic solutions and the equipment are used that are similar to those used in standard reactor plant V-320 and new one with VVER-1000 under construction and completion in Russia, and abroad. Compliance of reactor design with the up-to-date international requirements, considering the extended service life of the main equipment, shows its rather high potential for implementation during completion of 'Belene' NPP

  6. Overview of Cernavoda NPP training programme

    International Nuclear Information System (INIS)

    Valache, Cornelia

    2005-01-01

    Full text: The paper presents a general assessment of Cernavoda NPP personnel training programme, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is the one responsible for the training of Unit 1 and 2 staff. PTAD is structured in such a manner as to support and respond to all Cernavoda NPP training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programmes are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programmes are structured on the initial and continuing personnel training. Their content and goals respond to the training specific needs for each plant major job family. In order to successfully support NPP training programmes, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. There are also a number of general areas for improvement of PTAD activity, such as operators and maintenance training, initial and continuing training of both Unit 1 and 2 staff. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  7. Perspectives of NPP personnel training in the future?

    International Nuclear Information System (INIS)

    Khess, R.E.

    1996-01-01

    Problems of the NPP personnel education are discussed during radical reorganization of the state regulation of energy production and distribution when nuclear energetics will appears in the market conditions. Effective methods of the NPP personnel training developed by the corporation GPU Nuclear are given. Potentials of the application of simulators and computerized programs for increasing the NPP personnel education efficiency are considered

  8. Organization of monitoring of agricultural products in NPP region

    International Nuclear Information System (INIS)

    Panteleev, L.I.; Spirin, E.V.; Sanzharova, N.I.

    1990-01-01

    Problem of organizing chemical and radiation monitoring of agricultural products in NPP region is considered. Attention is paid to monitoring during NPP siting and designing, to monitoring of radioactive contamination of agricultural products under normal NPP operation, emergency situations and decommissioning

  9. Current status of Chernobyl NPP decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Strategy of Chernobyl NPP decommissioning with the decommissioning license 2002-2064 is presented. The main activities at the stage of ChNPP units shutdown (2002 - 2012) are: units maintenance in safe state; decommissioning infrastructure construction; unloading of SNF – main activity determining the stage duration; systems and elements final shutdown; decommissioning life-support systems reconstruction; Comprehensive engineering and radiation survey (CERS); dismantling of the reactor facilities external equipment; removal of RAW from units; decommissioning documentation development. The decommissioning activities main results are presented

  10. Radioactive waste problems in the Kozloduy NPP

    International Nuclear Information System (INIS)

    Videnov, N.; Stanchev, V.

    1995-01-01

    An average volume of 1400 m 3 a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed

  11. NPP Krsko natural circulation performance evaluation

    International Nuclear Information System (INIS)

    Segon, Velimir; Bajs, Tomislav; Frogheri, Monica

    1999-01-01

    The present document deals with an evaluation of the natural circulation performance of the Krsko nuclear power plant. Two calculation have been performed using the NPP Krsko nodalization (both similar to the LOBI A2-77 natural circulation experiment) - the first with the present steam generators at NPP Krsko (Westinghouse, 18% plugged), the second with the future steam generators (Siemens, 0% plugged). The results were evaluated using the natural circulation flow map derived in /1/, and were compared to evaluate the influence of the new steam generators on the natural circulation performance. (author)

  12. Low-water considerations for NPP sites

    International Nuclear Information System (INIS)

    Jensen, J.; Frank, T.; Wahl, T.

    2009-01-01

    In the frame of reactor safety considerations flood protection and the evaluation of low-water events are safety relevant issues. Therefore low-water statistics were performed for the coastal region Cuxhaven and the Elbe river estuary. The consideration of the longitudinal profile of water levels during low-tide in connection with surface water effects, morphodynamic changes of the river and anthropogenic modifications is of importance for conclusions concerning the NPP sites in some distance of the reference tide gauge. The authors performed a statistical low-tide analysis for the NPP sites Brunsbuettel and Brokdorf.

  13. Knowledge management during decommissioning of Chornobyl NPP

    International Nuclear Information System (INIS)

    Gora, A.D.; Kuchinskij, V.K.; Stel'makh, D.A.; Tsivun, T.A.

    2010-01-01

    The article deals with issues on knowledge management during decommissioning by the example of the Chornobyl NPP. This includes how the duration of decommissioning stage, change in organization goal and final state of the site influence on human resources and knowledge management system. The main attention is focused on human assets and intellectual strength of Chornobyl NPP. Mathematical dependencies are proposed to substantiate numerical values. An analysis is given for the current situation, and forecast estimates for values dynamics is performed. The conclusion gives solutions on providing experienced staff in the future.

  14. Radioactive waste problems in the Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Videnov, N; Stanchev, V [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    An average volume of 1400 m{sup 3} a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed.

  15. Medical consequences of NPP and TPP operation

    International Nuclear Information System (INIS)

    Bliznakov, V.

    1996-01-01

    Results from a comparative analysis of health conditions of the staff in the Kozloduy NPP and the Maritsa Iztok TPP are reported. It is found that the general disease incidence with temporary incapacity for work of Kozloduy workers is lower than those data for the workers at thermal power stations. The incidence of some social diseases like neoplasms, TBC, hypertension, ischemia etc. is also lower for the staff of NPP. No cases of radiation injuries have been registered for a period of 21 years

  16. Nuclear fuel operation at Balakovo NPP

    International Nuclear Information System (INIS)

    Morozov, A.

    2015-01-01

    The presentation addressed the positive experience of the TVS-2M assemblies implementation at Balakovo NPP in 18 month fuel cycles, at uprated power (104%) and the usage of the axial profiled Gd-rods in order to minimize the power peaking factors and linear heat rate in the upper part in some of the fuel rods. The results of the test operation of fuel rods with different claddings, made by E110M, E125 and E635M alloys at Balakovo NPP were also provided. The recently observed problem with the “white crust” on the cladding surfaces was also discussed

  17. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  18. NPP Krsko small break LOCA analysis

    International Nuclear Information System (INIS)

    Mavko, B.; Petelin, S.; Peterlin, G.

    1987-01-01

    Parametric analysis of small break loss of coolant accident for the Krsko NPP was calculated by using RELAP5/MOD1 computer code. The model that was used in our calculations has been improved over several years and was previously tested in simulation (s) of start-up tests and known NPP Krsko transients. In our calculations we modelled automatic actions initiated by control, safety and protection systems. We also modelled the required operator actions as specified in emergency operating instructions. In small-break LOCA calculations, we varied break sizes in the cold leg. The influence of steam generator tube plugging on small break LOCA accidents was also analysed. (author)

  19. Proceedings of the 14th International Meeting NUSIM 2006. Joint Slovak, Czech and German Seminar on Nuclear Power

    International Nuclear Information System (INIS)

    2006-01-01

    During April 26-28, 2006 was carried out The 14 th Annual Nuclear Safety Information Meeting, NUSIM 2006. Scientific conference deals with problems of reactor safety upgrading, mainly of two blocks of the NPP V-1 Bohunice as well as decommissioning of the NPP A-1 Bohunice. Other problems of the nuclear engineering were discussed. The Conference proceeded in the following sessions: (I) Survey on the Situation of Nuclear Power in the Partner Countries; (II) Experiences with WWER operation. Almost 100 participants from the Slovak Republic, Austria, Serbia and Montenegro, Czech Republic and Germany took part in the conference. Thirty-three scientific lectures and three papers were presented.

  20. External flood probabilistic safety analysis of a coastal NPP

    International Nuclear Information System (INIS)

    Pisharady, Ajai S.; Chakraborty, M.K.; Acharya, Sourav; Roshan, A.D.; Bishnoi, L.R.

    2015-01-01

    External events pose a definitive challenge to safety of NPP, solely due to their ability to induce common cause failures. Flooding incidents at Le Blayais NPP, France, Fort Calhoun NPP, USA and Fukushima Daiichi have pointed to the importance of external flooding as an important contributor to NPP risk. A methodology developed for external flood PSA of a coastal NPP vulnerable to flooding due to tsunami, cyclonic storm and intense local precipitation is presented in this paper. Different tasks for EFPSA has been identified along with general approach for completing each task

  1. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  2. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  3. Radioactive source management in Daya Bay NPP

    International Nuclear Information System (INIS)

    Mao Chun Yang

    2000-01-01

    'Small sources causes big accidents' had occurred worldwide many times. Radioactive source management in Nuclear Power Plant in very important for its safety record. This paper introduces the way and experience of radioactive source management in Daya Bay NPP from aspects of clarifying the responsibilities, centralizing the management of high radioactivity sources, work process management and experience feedback etc. (author)

  4. Jose Cabrera NPP severe accident management activities

    International Nuclear Information System (INIS)

    Blanco, J.; Almeida, P.; Saiz, J.; Sastre, J.L.; Delgado, R.

    1998-01-01

    To prepare a common acting plan with respect to Severe Accident Management, in 1994 was founded the severe accident management ''ad-hoc'' working group from the Spanish Westinghouse PWR Nuclear Power Plant Owners Group. In this group actively collaborated the Jose Cabrera NPP Training Centre and the Department of Nuclear Engineering of UNION FENOSA. From this moment, Jose Cabrera NPP began the planning of its specific Severe Accident Management Program, which main point are Severe Accident Management Guidelines (SAMG). To elaborate this guidelines, the Spanish translation of Westinghouse Owners Group (WOG) Severe Accident Management Guidelines were considered the reference documents. The implementation of this Guidelines to Jose Cabrera NPP started on January 1997. Once the specific guidelines have been implemented to the plant, training activities for the personnel involved in severe accident issues will be developed. To prepare the training exercises MAAP4 code will be used, and with this intention, a specific Jose Cabrera NPP MAAP-GRAAPH screen has been developed. Furthermore, a wide selection of MAAP input files for the simulation of different scenarios and accidental events is available. (Author)

  5. External hazards considered for Paks NPP

    International Nuclear Information System (INIS)

    Kiss, Tibor

    2000-01-01

    PAKS NPP was built according to Soviet construction standards which took into account meteorological aspects but no documents for other external hazards were available. Main activities concerning earthquakes cover reevaluation of the plant site, seismic safety technological concept, improving the seismic resistance, installation of seismic monitoring and protection system, and seismic PSA

  6. Maintenance training centre at NPP Paks, Hungary

    International Nuclear Information System (INIS)

    Babos, K.

    1996-01-01

    The lecture shows the feature of WWER-440/213 units maintenance, the existing maintenance training system, the necessity of the change in maintenance training system at NPP Paks. The author introduces the would-be maintenance training centre, the training facilities and the main tasks related to the maintenance training. (author)

  7. Safety culture development at Daya Bay NPP

    International Nuclear Information System (INIS)

    Zhang Shanming

    2001-01-01

    From view on Organization Behavior theory, the concept, development and affecting factors of safety culture are introduced. The focuses are on the establishment, development and management practice for safety culture at Daya Bay NPP. A strong safety culture, also demonstrated, has contributed greatly to improving performance at Daya Bay

  8. Development of the NPP Kozloduy informational system

    Energy Technology Data Exchange (ETDEWEB)

    Katsarov, Y; Manchev, B [Risk Engineering Ltd., Sofia (Bulgaria)

    1996-12-31

    A unified computer system to be implemented in the Kozloduy NPP is described. It allows to generate all general indicators and documents for plant operation needed according to the national regulation and WANO Performance Indicators. The system combines multi-purpose data collection with probabilistic analysis, evaluation of the human factor and optimization of the regulated verification of the equipment. 3 refs.

  9. NPP radioactive waste processing and solidification

    International Nuclear Information System (INIS)

    Nikiforov, A.S.; Polyakov, A.S.; Zakharova, K.P.

    1983-01-01

    The problems of proce-sing NPP intermediate level- and low-level liquid radioactive wastes (LRW) are considered. Various methods are compared of LWR solidification on the base of bituminization, cement grouting and inclusion into synthetic resins. It is concluded that the considered methods ensure radioactive radionuclides effluents into open hydronetwork at the level below the sanitary, standards

  10. Biotic elements of NPP techno-ecosystem

    International Nuclear Information System (INIS)

    Protasov, A.A.; Silaeva, A.A.

    2013-01-01

    Specific features of biotic elements in the NPP techno-ecosystems were considered and compared with natural ecosystems. Relationships between biotic communities and environmental factors that are specific to the techno-ecosystems were discussed, and the problems of limitation of biological hindrances in operation of equipment, principles of hydrobiological and environmental monitoring were considered.

  11. Slovakia: Mochovce NPP. Project control. Annex 10

    International Nuclear Information System (INIS)

    Bodorik, K.

    1999-01-01

    This annex deals with project control. Mochovce NPP suffered considerable delay primarily due to lack of money. This situation was corrected and construction resumed in 1996. Throughout the 'dormant' period the plant received considerable support from the major contractors, who maintained skeleton staff at site. Significant safety and managerial improvements are being introduced and a strategic plan for the plant has been developed. (author)

  12. Development of NPP safety regulation in Russia

    International Nuclear Information System (INIS)

    Vishnevsky, Y.G.; Gutsalov, A.T.; Bukrinsky, A.M.; Gordon, B.G.

    1999-01-01

    The presentation describes the organisation scheme of Russian safety regulatory bodies, their tasks and responsibilities. Legislative and regulatory basis of NPP safety regulations rely on the federal laws: Law on the Use of Nuclear Energy and Law on Radiation Safety of the Population. Role of international cooperation and Improvement of regulatory activities in Russia are emphasised

  13. Sitting Safety Aspects of Second Romanian NPP

    International Nuclear Information System (INIS)

    Mauna, T.

    2010-01-01

    The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units like the Wolsong applied design project for nuclear island. For the BOP parts the ASALDO-GE project was applied with the careful about the interface connection NSP requirements. The new NPP sitting studies began from 1982 in a serious manner as first part on Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. For develop the all package of the studies in concordance with the first IAEA Safety Standards recommendations. Till the 1982 the first mission of design and research multi-branch of specialists team was to adapt the NPP Cernavoda project having a open water cooling circuit to the new parameters of close water cooling circuit. But the team was looking at the other type of NPP for sitting. Also in the same time was studied the possibility of NSP foundation on hard less or soft soil foundation strata in connection with safety aspects. The close circuit of cooling water means others parameters of systems and need very large cooling towers. Also must be reconsidering the safety systems design and performance as new solution. In the south of Transylvania historical region in Romania the Olt River run from west to east having medium multi annual flow around 70 m3/s. The Olt River has a chain of small hydropower in operation and other planned. From geological and geophysical points of view two main faults, along the Olt river valley, one of this having seismically small activities was detected. Site region geotechnical studies show small quantity underground natural gas, salt and peat. The initial nuclear program has imposed 4 NPP units site near Olt River. Taking into account the orogenesis, water cooling needs and other local feature can't be built more than two NPP units on a site. This paper tries to reconsider the old analysis from the last IAEA Safety Standards point of view taking into account the new

  14. Considerations related to Cernavoda NPP lifetime management

    International Nuclear Information System (INIS)

    Cojan, Mihail

    2007-01-01

    Cernavoda NPP, the first CANDU in Europe, is one of the original CANDU 6 plants and the first CANDU 6 producing over 706 MWe. While the first series of CANDU 6 plants (which entered service in the early 1980 s) have now reached the 2/3 of their 30 years design life, the Cernavoda NPP was put into service on the 2nd December 1996. After 10 years of operation the Plant Life Management (PLiM) Program for Cernavoda should be an increasingly important program to Utility ('CNE - Prod') in order to protect the investment and the continued success of plant operation. The goal of the paper is to present some considerations related to Cernavoda NPP lifetime management. The Plant Life Management Program, known as PLiM Program is concerned with the analysis of technical limits of the safe operation - from the point of view of nuclear safety - in NPP units, aiming at attaining the planned 30 years life duration and its extension to 40 or even 50 years of safe and economical operation. For the CANDU reactors the so-called PLiM and PLEX Programs are just applied. These are applied research programs that approach with priority the current practices for assessing the capability of safe operation within the limits of nuclear safety (fitness-for-service assessment). These programs also approach inspection, monitoring are prevention of degrading due to the ageing of critical systems, structures and components (CSSCs). As each nuclear plant is somewhat different in its components and systems, materials composition, procurement, construction, and operational history, directed research and development programs into materials behavior, monitoring techniques, and methods to mitigate ageing are required to support the lifetime management. Over the past 6 years, INR Pitesti (Institute for Nuclear Research - Romania) has been working on R and D Programs to support a comprehensive and integrated Cernavoda NPP Life Management Program (PLiM) that will see the Cernavoda NPP successfully and

  15. Safety Analysis Report for Ignalina NPP

    International Nuclear Information System (INIS)

    Negrivoda, G.

    1997-01-01

    In December 1994 an agreement was signed between the European Bank for Reconstruction and Development and the Republic of Lithuania for the grant of 32.86 MECU for the safety Improvement at Ignalina NPP. One of the conditions for the provision of the grant, was a requirement for an in-depth analysis of the safety level at Ignalina NPP in the scope and according to the standards acceptable for a western nuclear power plant, and to publish a Safety Analysis Report (SAR). The report should investigate and analyze any factor that could limit a safe operation of the plant, and provide recommendations for actual safety improvements. According to the agreement, Lithuania had to finalize the SAR until 31 December, 1995. The bank has also organized and financed investigation of safety at Ignalina NPP and preparation of the SAR. EBRD made an agreement with Sweden's Vattenfall, which subcontracted well-known companies from Canada, USA, Germany, etc., and also the Russian Research and Development Institute of Power Engineering (NIKIET), reactor designer of Ignalina NPP. The SAR is a very comprehensive document and contains about 8000 pages of text, diagrams and tables. The main findings of the SAR are provided in the article. A large number of discrepancies with modern rules and western practices was detected, but they were not proved to be serious enough to require reactors shutdown. Based on the recommendations of the SAR Ignalina NPP has worked out Safety Improvement Program No. 2 (SIP-2), which is planned for three years and will cost 486 MLT. (author)

  16. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  17. Modernization of the oldest Swedish NPP

    International Nuclear Information System (INIS)

    Hagberth, Ronald

    1998-01-01

    OKG operates three BWR units of ABB design: Oskarshamn 1 with a net capacity of 440' MW, Oskarshamn 2 of 600 MW and Oskarshamn 3 of 1160 MW. Oskarshamn 1 NPP was commissioned in 1972 as the first commercial nuclear unit in Sweden. After more than twenty years of successful operation, the unit is now also the first reactor in Sweden to undergo a large safety modernization program. In the year 2000 the Oskarshamn 1 NPP will be modernized to a high level of safety standard and ready for operation for another period of at least 20 years. Experience gained can be used when modernizing other NPPs. The investment program for life extension is reasonable and shows that NPPs can be operated with an expected life span of more than 40 years at an ever-increasing safety level and still be very competitive in a deregulated market. (author)

  18. Intelligent system for accident identification in NPP

    International Nuclear Information System (INIS)

    Hernandez, J.L.

    1998-01-01

    Accidental situations in NPP are great concern for operators, the facility, regulatory bodies and the environmental. This work proposes a design of intelligent system aimed to assist the operator in the process of decision making initiator events with higher relative contribution to the reactor core damage occur. The intelligent System uses the results of the pre-operational Probabilistic safety Assessment and the Thermal hydraulic Safety Analysis of the NPP Juragua as source for building its knowledge base. The nucleus of the system is presented as a design of an intelligent hybrid from the combination of the artificial intelligence techniques fuzzy logic and artificial neural networks. The system works with variables from the process of the first circuit, second circuit and the containment and it is presented as a model for the integration of safety analyses in the process of decision making by the operator when tackling with accidental situations

  19. Quality of Industry Support to NPP Krsko

    International Nuclear Information System (INIS)

    Nemcic, K.

    2008-01-01

    NPP Krsko developed program for Supplier evaluation and performance. During the regular control of suppliers and evaluation of industry support to NPP Krsko quality problems were reported. Different quality systems were evaluated and different suppliers as: design organizations, equipment manufacturers, material vendors were audited or surveillance was performed. This paper discuss and report various cases where quality issues were problems based on audit results and present actions and efforts undertaken by the NE Krsko Quality Assurance Department to improve performance of the contractors, vendors, suppliers. New and different quality standards as approach in numerous articles are described as improvement or quality changes but also 'different opinion exist'. This paper also presents the author view and approach how to solve the possible future problems with different quality systems and organisations used by industry who support daily operation of NE Krsko and give recommendations for future nuclear projects.(author)

  20. SAT for NPP personnel training in USA

    International Nuclear Information System (INIS)

    Spinney, R.

    1995-01-01

    This discussion addressed the experience with the application of SAT at USA NPPs. In particular, the transition of NPP training processes, staff composition, and reporting structure from the TMI accident to present. As well, oversight and guidance activities of the INPO and more intensive inspection by the NRC began during this period. The average NPP training staff grew to 30-40 per unit, along with a change in reporting line from plant to corporate management. With the reduction of resources occurring in the late 1980s, overall training staff size decreased, the composition changed, and reporting line reverted to plant management. The overall lessons-learned for application of the SAT consisted of the need for simplification, management involvement, and exploitation of the technology

  1. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  2. NPP Temelin. Status of safety improvements

    International Nuclear Information System (INIS)

    1999-01-01

    The WWER-1000 Temelin NPP under construction has been subjected as other NPPs of the same type to numerous project reviews resulting in quite a number of recommendations for design changes. Results of the IAEA mission to review the resolution of WWER-1000 safety issues at Temelin NPP are cited in this paper. The main conclusions emphasize that a combination of eastern and western technology and practices led to safety improvements in comparison with the international practices. Plant managers are clearly committed to implementation of operational programs which are consistent with effective western operational safety practices. Considerable effort remains to bring planned programs to successful implementation, in particular in meeting the need to foster strong safety culture among all personnel

  3. Organizational aspects of NPP operator training

    International Nuclear Information System (INIS)

    Vel'chinskij, V.I.

    1992-01-01

    The main points of the document regulating the selection, prepation, permission for work and in-service control of NPP personnel developed on the basis of the IAEA requirements are considered. The specialists engaged for work are subjected to qualification, medical, professional, psychological and psychophysiological selections. The scheduled monthly instructive lessons are conducted during the work. The antiaccident and fire-fighting trainings are organized not rarely than twice in three months

  4. Current status of NPP generation IV

    International Nuclear Information System (INIS)

    Yohanes Dwi Anggoro; Dharu Dewi; Nurlaila; Arief Tris Yuliyanto

    2013-01-01

    Today development of nuclear technology has reached the stage of research and development of Generation IV nuclear power plants (advanced reactor systems) which is an innovative development from the previous generation of nuclear power plants. There are six types of power generation IV reactors, namely: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), and Super Critical Water-cooled Reactor (SCWR). The purpose of this study is to know the development of Generation IV nuclear power plants that have been done by the thirteen countries that are members of the Gen IV International Forum (GIF). The method used is review study and refers to various studies related to the current status of research and development of generation IV nuclear power. The result of this study showed that the systems and technology on Generation IV nuclear power plants offer significant advances in sustainability, safety and reliability, economics, and proliferation resistance and physical protection. In addition, based on the research and development experience is estimated that: SFR can be used optimally in 2015, VHTR in 2020, while NPP types GFR, LFR, MSR, and SCWR in 2025. Utilization of NPP generation IV said to be optimal if fulfill the goal of NPP generation IV, such as: capable to generate energy sustainability and promote long-term availability of nuclear fuel, minimize nuclear waste and reduce the long term stewardship burden, has an advantage in the field of safety and reliability compared to the previous generation of NPP and VHTR technology have a good prospects in Indonesia. (author)

  5. AGNES - safety reassessment of Paks NPP

    International Nuclear Information System (INIS)

    Gado, J.

    1995-01-01

    The main goal of the AGNES (Advanced General and New Evaluation of Safety) project for the reassessment of the safety of Paks Nuclear Power Plant, Hungary, was to improve the safety culture of the technology at Paks. A report was prepared on the reassessment of the Paks NPP safety. The analysis was divided into four groups: systems analysis, analysis of design basis accidents, severe accident analysis, and level 1 probabilistic safety analysis. Proposed safety enhancement measures are discussed. (N.T.)

  6. Design safety improvements of Kozloduy NPP

    International Nuclear Information System (INIS)

    Hinovski, I.

    1999-01-01

    Design safety improvements of Kozloduy NPP, discussed in detail, are concerned with: primary circuit integrity; reactor pressure vessel integrity; primary coolant piping integrity; primary coolant overpressure protection; leak before break status; design basis accidents and transients; severe accident analysis; improvements of safety and support systems; containment/confinement leak tightness and strength; seismic safety improvements; WWER-1000 control rod insertion; upgrading and modernization of Units 5 and 6; Year 2000 problem

  7. Aspects of accident management in Cernavoda NPP

    International Nuclear Information System (INIS)

    Dascalu, N.

    1999-01-01

    As a general conclusion, the accident management system as implemented at Cerna voda NPP is expected to be appropriate for handling a severe accident, should it occur, in such a way that the environmental radiological consequences would be insignificant and radiation exposure of the personnel be within recommendations. It is recognized, however, that continued development and verification of the system as well as effective personnel training programs are essential to maintain the safety level achieved. (author)

  8. On some methods of NPP functional diagnostics

    International Nuclear Information System (INIS)

    Babkin, N.A.

    1988-01-01

    Methods for NPP functional diagnosis, in which space and time dependences for controlled variable anomalous deviations change are used as characteristic features, are suggested. The methods are oriented for operative recognition of suddenly appearing defects and envelop quite a wide range of possible anomalous effects in an onject under diagnostics. Analysis of transients dynamic properties caused by a failure is realized according to the rules, which do not depend on the character of anomalous situation development

  9. Supercompaction of radioactive waste at NPP Krsko

    International Nuclear Information System (INIS)

    Fink, K.; Sirola, P.

    1996-01-01

    The problem of radioactive waste management is both scientifically and technically complex and also deeply emotional issue. In the last twenty years the first two aspects have been mostly resolved up to the point of safe implementation. In the Republic of Slovenia, certain fundamentalist approaches in politics and the use of radioactive waste problem as a political tool, brought the final radioactive repository siting effort to a stop. Although small amounts of radioactive waste are produced in research institutes, hospitals and industry, major source of radioactive waste in Slovenia is the Nuclear Power Plant Krsko. When Krsko NPP was originally built, plans were made to construct a permanent radioactive waste disposal facility. This facility was supposed to be available to receive waste from the plant long before the on site storage facility was full. However, the permanent disposal facility is not yet available, and it became necessary to retain the wastes produced at the plant in the on-site storage facility for an extended period of time. Temporary radioactive storage capacity at the plant site has limited capacity and having no other options available NPP Krsko is undertaking major efforts to reduce waste volume generated to allow normal operation. This article describes the Radioactive Waste Compaction Campaign performed from November, 1994 through November, 1995 at Krsko NPP, to enhance the efficiency and safety of storage of radioactive waste. The campaign involved the retrieval, segmented gamma-spectrum measurement, dose rate measurement, compaction, re-packaging, and systematic storage of radioactive wastes which had been stored in the NPP radioactive waste storage building since plant commissioning. (author)

  10. Using bentonite for NPP liquid waste treatment

    International Nuclear Information System (INIS)

    Bui Dang Hanh

    2015-01-01

    During operation, nuclear power plants (NPPs) release a large quantity of water waste containing radionuclides required treatment for protection of the radiation workers and the environment. This paper introduces processes used to treat water waste from Paks NPP in Hungary and it also presents the results of a study on the use of Vietnamese bentonite to remove radioactive Caesium from a simulated water waste containing Cs. (author)

  11. Perspectives of Living PSA in NPP Krsko

    International Nuclear Information System (INIS)

    Vrbanic, I.; Kastelan, M.

    1996-01-01

    Nuclear power plant Krsko has completed the Level 1/Level 2 Probabilistic Safety Analysis (PSA) for internal initiating events and is in the process of completing the same for the external initiators. The analysis completed up to now has provided a valuable insight into a plant risk profile. In NPP Krsko there is a plan to use the PSA model as a permanent tool for the risk based applications and incorporate it into a decision making process. In order to achieve this there is a need to permanently maintain the PSA model in a manner that it reflects both the plan configuration/design at a time point and the operational experience up to the time point. All the activities aimed toward keeping the PSA model up-to-dated in this sense are usually referred to as a Living PSA (LPSA) program. NPP Krsko is in the process of defining and proceduralizing a LPSA program that would be plant specific and based on known world practices. Further, in order to be suitable for risk based applications the PSA model must be flexible in a sense that modifications to the base case model may be done easily and requantifications performed quickly as to evaluate various conditions imposed by real or hypothetical situations. NPP Krsko PSA model has been based on licensing type software. The requirements specified above dictate the transfer of the overall model to an application oriented software of newer generation with larger capabilities. The transfer becomes a part of a mentioned ongoing effort aimed at establishing LPSA model and concept. The paper present this effort and the perspectives of LPSA concept and risk based applications in NPP Krsko. (author)

  12. Simulation of reinforced concrete NPP structures

    International Nuclear Information System (INIS)

    Zverev, A.B.; Yaskevich, E.E.; Tarannikov, V.N.; Loginov, A.Ya.; Lagutov, V.I.

    1989-01-01

    Analysis of stress-strained state of NPP frame structures at different stages of their operation using the method of physical simulation, is conducted. Comparison of model investigations to the data of full-scale deformation measurement allows one to define the strength resource of the structures under operation. Bench test layout and results of investigations into strength, deformation, thermal-physical and acoustic emission parameters of the investigated processes during model loading, are presented

  13. Conference: Nuclear Safety at the Ignalina NPP - Achievements and Challenges

    International Nuclear Information System (INIS)

    1999-01-01

    Brief description of conference which took place in Vilnius on 8-9 April 1999 is presented. The aim of the international conference is to review the work carried out, to evaluate its influence on the nuclear safety, to get acquainted with the safety system of the Ignalina NPP. On December 31, the Ignalina NPP celebrated its 15 year anniversary. During that period the Ignalina NPP has produced more than 182 billion kWh of electricity. Nuclear power is not only immense economic benefit but also a syndrome of fear of an atomic bomb and the Chernobyl accident that has formed over the years. Numerous comprehensive international studies have been performed at the Ignalina NPP. After the Chernobyl accident many steps have been taken to improve the safety of the Ignalina NPP. The introduced changes guaranteed that the void coefficient remained negative in all possible circumstances. The Ignalina NPP is intensively preparing for licensing of unit 1

  14. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  15. Ageing management database development for PWR NPP steam generator

    International Nuclear Information System (INIS)

    Liu Hongyun; Xu Liangjun; Xiong Changhuai; Wang Xianyuan

    2005-01-01

    Steam generator (SG) is one of the key safe important equipment of NPP, which is covered by NPP aging management program. Steam Generator Aging Management Dabatase (SGAMDB) is developed to provide necessary information for SG aging management. RINPO is developing SGAMDB for domestic NPP. This system contains information and data about SG design, manufacture, operation and maintenance. The information include NPP fundamental data, SG design data, SG aging mechanism, SG operation data, SG ISI data, SG maintenance data and SG evaluation interface. The system runs at the intranet of Qinshan-1 NPP with B/S mode. It can provide information inquire and fundamental analysis for NPP SG aging team and SG aging researcher's. In addition, it provides necessary information and data for SG aging analysis and evaluation, such as all pressure test process and flaws of tubes, and collects the analysis results. (authors)

  16. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  17. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  18. Safety parameter display system for Kalinin NPP

    International Nuclear Information System (INIS)

    Andreev, V.I.; Videneev, E.N.; Tissot, J.C.; Joonekindt, D.; Davidenko, N.N.; Shaftan, G.I.; Dounaev, V.G.; Neboyan, V.T.

    1995-01-01

    The paper discusses the safety parameter display system (SPDS), which is being designed for Kalinin NPP. The assessment of the safety status of the plant is done by the continuous monitoring of six critical safety functions and the corresponding status trees. Besides, a number of additional functions are realized within the scope of KlnNPP, aimed at providing the operator and the safety engineer in the main control room with more detailed information in accidental situation as well as during the normal operation. In particular, these functions are: archiving, data logs and alarm handling, safety actions monitoring, mnemonic diagrams indicating the state of main technological equipment and basic plant parameters, reference data, etc. As compared with the traditional scope of functions of this kind of systems, the functionality of KlnNPP SPDS is significantly expanded due to the inclusion in it the operator support function ''computerized procedures''. The basic SPDS implementation platform is ADACS of SEMA GROUP design. The system architecture includes two workstations in the main control room: one is for reactor operator and the other one for safety engineer. Every station has two CRT screens which ensures computerized procedures implementation and provides for extra services for the operator. Also, the information from the SPDS is transmitted to the local crisis center and to the crisis center of the State utility organization concern ''Rosenergoatom''. (author). 3 refs, 6 figs, 1 tab

  19. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  20. Tritium liquid effluents from the Krsko NPP

    International Nuclear Information System (INIS)

    Savli, S.; Krizman, M.; Nemec, T.; Cindro, M.; Stritar, A.; Vokal Nemec, B.; Janzekovic, H.

    2007-01-01

    In the past, 12-months' fuel cycles in the Krsko NPP had not caused any problems regarding compliance with its Technical Specifications and license limits on liquid tritium releases (20 TBq/year, 8 TBq/three months). The first 18-months' fuel cycle, which was introduced in 2004, required fuel with higher enrichment, higher boron concentration in the primary coolant and more fuel rods with burnable poisons. In 2005, the NPP operated without refueling outage for the whole year and produced the highest amount of energy so far. Due to these facts and a few unplanned shutdowns and power reductions, production of tritium and releases increased strongly in 2005. As a result, the Krsko NPP hardly succeeded to stay within regulatory limits on tritium releases. However, the three-months' limit was exceeded in the first quarter of 2006. On the basis of conclusions acquired from the SNSA's study and practice of other European countries the SNSA considerably increased the annual limit of permitted liquid tritium releases (from 20 TBq to 45 TBq) and abolished the three-months' limit. At the same time, the SNSA reduced the limit of fission and activation products by halves. (author)

  1. Knowledge management in the NPP domain

    International Nuclear Information System (INIS)

    Nilsen, Svein; Bisio, Rossella; Ludvigsen, Jan Tore

    2004-03-01

    This report gives an outlook on Knowledge Management (KM) activities within NPP related establishments as of today. There may be less activity in the NPP world as compared to many other industrial sectors. Still there is an awakening within the NPP industry demanding that KM should be attended to at a larger scale. The most notable reason for this is maybe an imminent increase in the number of people going into retirement. The types of establishments involved cover the major kinds such as utilities, research institutes and worldwide nuclear organizations. The report sums up a few of those efforts that are presently being implemented. Moreover the report looks at general advancements within the field of knowledge management. Simply stated the endeavours belong to either one of two classes. The first class emphasize the use of technology to solve knowledge management problems. The second class regard knowledge management as a problem pertaining to human factors and organizational issues. This report maintain that knowledge management initiatives should make due considerations to both perspectives. This report also sums up the Halden Reactor Project short term KM initiative. (Author)

  2. On psichological problem of NPP operation and control

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1994-01-01

    The role of psichological factor as a reserve for increasing NPP safety connected with human factor is discussed. It is emphasized that the process of NPP personnel professional training should not be restricted by formation of a certain set of knowledge, skills and experience. It is necessary to initiate ability for constant self-developing. Control for assurance of effective interaction of the whole NPP personnel is an important problem

  3. Safety Culture Survey in Krsko NPP

    International Nuclear Information System (INIS)

    Strucic, M.; Bilic Zadric, T.

    2008-01-01

    The high level of nuclear safety, stability and competitiveness of electricity production, and public acceptability are the main objectives of Krsko Nuclear Power Plant. This is achievable only in environment where strong Safety Culture is taking dominant place in the way how employees communicate, perform tasks, share their ideas and attitudes, and demonstrate their concern in all aspects of work and coexistence. To achieve these objectives, behaviour of all employees as well as specific ethical values must become more transparent and that must arise from the heart of organization. Continuous ongoing and periodic self assessments of Safety Culture in Krsko NPP present major tools in implementation process of this approach. Benefits from Periodic interdisciplinary focused self assessment approach, which main intention is finding the strengths and potential areas for improvements, was used second time to assess the area of Safety Culture in Krsko NPP. Main objectives of self assessment, performed in 2006, were to increase the awareness of the present culture, to serve as a basis for improvement and to keep track of the effects of change or improvement over a longer period of time. For the purpose of effective self assessment, extensive questionnaire was used to obtain information that is representative for whole organization. Wide range of questions was chosen to cover five major characteristics of safety culture: Accountability for safety is clear, Safety is integrated into all activities, Safety culture is learning-driven, Leadership for safety is clear and Safety is a clearly recognized value. 484 Krsko NPP employees and 96 contractors were participated in survey. 70-question survey provided information that was quantified and results compared between groups. Anonymity of participant, as well as their willingness to contribute in this assessment implicates the high level of their openness in answering the questions. High number of participant made analysis of

  4. Main principles of NPP project ecological expert investigation

    International Nuclear Information System (INIS)

    Dibobes, I.K.; Revina, S.K.; Glushkov, V.P.

    1983-01-01

    NPP project ecological expert investigation among the other objectives is to provide implementation of standards, rules and requirements as well as government decrees and international obligations of the USSR concerning the environment protection. The expert investigation takes into consideration both environment protection, regional, resources, ecological, demographic and economic aspects. The NPP siting and the local environment and resources state are estimated as well as the structure of utilization of the latter, the expected damage to the environment due to NPP construction and the measures directed towards the optimal using of natural resources. On the basis of the presented issues suggestions about NPP projects coordination with Goskomgidromet's institutions are given [ru

  5. Dissemination of Knowledge about NPP Instrumentation and Control Systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.

    2016-01-01

    Full text: Instrumentation and control (I&C) systems are the most variable part in the nuclear power plants (NPP) comparatively with any other NPP systems. This statement is connected with the wide use of computers, rapid changes in information technologies, with the appearance of new computer complex electronic components, e.g., field programmable gate arrays (FPGA) and with appropriate point of their insertion into NPP I&C life cycle. The changes in NPP I&C systems require the dissemination of the knowledge about these systems. Lessons after Fukushima accident increase necessity of these actions. The elaboration and following dissemination of this knowledge took place in different directions: • Writing and issue of three new books about NPP I&C systems for specialists and for students which were issued in Ukrainian and USA public houses (the last book was issued in 2014); • Organization of five international scientific technical conferences, devoted to NPP I&C safety problems; • Elaboration of national (Ukrainian) standards and regulations pertaining to safety important NPP I&C systems (the last standard was issued in 2015) and participation in elaboration of international standards; • Lecturing for university students, NPP specialists and I&C designers. These actions in all directions are added to IAEA activity in the area NPP I&C systems (e.g., IAEA NP-T-3.12 “Core Knowledge on I&C systems in NPP”). (author

  6. Leningrad NPP and energetics of north-western Russia

    International Nuclear Information System (INIS)

    Belov, I.

    2000-01-01

    Problems of Leningrad NPP operating units modernization, their design service life finishing by year of 2010, are discussed. To assure safe operation of unit 1 investments in the amount of 30 mln. dol are necessary. Estimations suggest economic efficiency of the measures, permitting saving of 300 mln. dol worth of gas. Unfortunately, without a rise in tariff for electric power produced by NPP it seems impossible. It is recommended that substantiated tariffs are set for electric power produced by NPP starting from January, 2000. The measure is indispensable for raising investment funds intended for operating NPP modernization [ru

  7. Probabilistic assessment of NPP safety under aircraft impact

    International Nuclear Information System (INIS)

    Birbraer, A.N.; Roleder, A.J.; Arhipov, S.B.

    1999-01-01

    Methodology of probabilistic assessment of NPP safety under aircraft impact is described below. The assessment is made taking into account not only the fact of aircraft fall onto the NPP building, but another casual parameters too, namely an aircraft class, velocity and mass, as well as point and angle of its impact with the building structure. This analysis can permit to justify the decrease of the required structure strength and dynamic loads on the NPP equipment. It can also be especially useful when assessing the safety of existing NPP. (author)

  8. Near Regional and Site Investigations of the Temelin NPP Site

    International Nuclear Information System (INIS)

    Prachar, Ivan; Vacek, Jiri; Heralecky, Pavel

    2011-01-01

    The Temelin NPP is worldwide through heated discussion with nuclear energetic opposition. In addition this discussion goes beyond a border of the Czech Republic. On the other side, results of several international supervisions shown that Temelin NPP is fully comparable with the safest nuclear power plants in the world regarding its technical design and safety functions. This presentation deals with the near regional and site investigations of the Temelin NPP Site. It must be noted that although the Temelin site is situated in the area with low seismicity, item of seismicity is a basic argument against Temelin NPP and therefore a detail seismic hazard assessment was performed

  9. Predisposal of Radioactive Waste from NPP 1000 MWe

    International Nuclear Information System (INIS)

    Suryantoro

    2007-01-01

    Predisposal of radioactive waste from NPP 1000 MW which was planned to be operated in 2016 has been conducted. In this study NPP applying PWR type was assumed. This assessment comprises all aspects of radioactive waste coming from NPP. One through cycle was chosen consequently no reprocessing step will be conducted. The assessment shows that technologically all radioactive waste treatment process rising from NPP operation has similarities to the existing radioactive waste process conducted by RWI which has lower scale of waste amount. (author)

  10. From the chronicle of training of Dukovany NPP staff

    International Nuclear Information System (INIS)

    2005-01-01

    The long way the Dukovany NPP had to go before the plant staff was fully qualified and skilled is described. First the training concept was prepared, then the necessary training facilities were set up, lecturers and instructors were hired and trained, training programmes and training materials were developed, and ultimately the first training course was launched in 1979. A training NPP was constructed and a full-scope simulator of the Dukovany NPP was set up. The current status of organization of NPP staff training by the CEZ utility is highlighted. (author)

  11. Training center of Rovenskaya NPP. The experience of creation

    International Nuclear Information System (INIS)

    Fedorov, O.M.; Aristov, B.N.

    1991-01-01

    Experience in creation of a teaching-training centre at the Rovno NPP, which uses means available at unified NPPs, at most is discussed. The centre hardware complex functions include the event filing and providing for user-friendly interface with NPP technical personnel under training. The system of personnel training at the Rovno NPP teaching-training centre gives an opportunity to analyze accidents and emergency conditions more completely and carefully. The taching analysis of failures and accidents by a NPP operators using the complex of the teaching-training centre hardware sufficiently improves knowledge of particular accidents

  12. Chernobyl NPP decommissioning efforts - Past, Present and Future. Decommissioning Efforts on Chernobyl NPP site - Past, Present

    International Nuclear Information System (INIS)

    Kuchinskiy, V.

    2017-01-01

    Two unique large-scale projects are underway at the moment within the Chernobyl - Exclusion zone - Shelter object transformation into ecologically safe system and the decommissioning of 3 Chernobyl NPP Units. As a result of beyond design accident in 1986 the entire territory of the industrial site and facilities located on it was heavily contaminated. Priority measures were carried out at the damaged Unit under very difficult conditions to reduce the accident consequences and works to ensure nuclear and radiation safety are continuous, and the Unit four in 1986 was transformed into the Shelter object. Currently, works at the Shelter object are in progress. Under assistance of the International Community new protective construction was built above the existing Shelter object - New Safe Confinement, which will ensure the SO Safety for the long term - within up to 100 years. The second major project is the simultaneous decommissioning of Chernobyl NPP Units 1, 2 and 3. Currently existing Chernobyl NPP decommissioning Strategy has been continuously improved starting from the Concept of 1992. Over the years the following was analyzed and taken into account: the results of numerous research and development works, international experience in decommissioning, IAEA recommendations, comments and suggestions from the governmental and regulatory bodies in the fields of nuclear energy use and radioactive waste management. In 2008 the final decommissioning strategy option for Chernobyl NPP was approved, that was deferred gradual dismantling (SAFSTOR). In accordance with this strategy, decommissioning will be carried out in 3 stages (Final Shutdown and Preservation, Safe Enclosure, Dismantling). The SAFSTOR strategy stipulates: -) the preservation of the reactor, the primary circuit and the reactor compartment equipment; -) the dismantling of the equipment external in relation to the reactor; -) the safe enclosure (under the supervision); -) the gradual dismantling of the primary

  13. Planning for Environmental Restoration in Slovak Republic

    International Nuclear Information System (INIS)

    Slavik, O.; Moravek, J.

    1995-01-01

    The restoration in the Slovak Republic concerns to the contaminated banks of the waste water recipient of the Bohunice Nuclear Power Plant. The identified contamination, consisting mainly of 137 Cs, is a result of two accidents on the CO 2 -cooled and heavy water moderated NPP Bohunice-A1 unit of NPP Bohunice complex. Two type of radiation risk scenarios, namely the bank use and contaminated soil (from bank) use scenario were investigated in relation to decision making on the planning for restoration of the contaminated banks. Results of dose assessments and the approach to planning for restoration of contaminated banks are summarized in the paper. Some details from the worked out technical design of the contaminated soil removal from the banks and its safe disposal in a near surface isolated basin are introduced in the paper too

  14. Proceedings of the 9th NUSIM 2000 Conference. Joint Slovak, Czech and German Seminar on Nuclear Power

    International Nuclear Information System (INIS)

    2000-01-01

    Scientific conference deals with problems of reactor safety upgrading, mainly of two blocks of the NPP V-1 Bohunice as well as decomissioning of the NPP A-1 Bohunice. Other problems of the nuclear engineering were discussed. Totally, 201 participants from the Slovak Republic, Czech Republic and Germany and from other countries took part in the conference. The Conference included the following sessions: (i): Survey on the situation of nuclear power in the partner countries; (ii) Mochovce design safety enhacement and operational experience; (iii) Bohunice V-1 safety upgrading and operational experience; (iv) Decomissioning, spent fuel and radwaste management; (v) Young Generation Presentation. Proceedings contains thirty one papers dealing with the scope of INIS

  15. Calculation of radiation dose rate above water layer of Interim Spent Fuel Storage Jaslovske Bohunice by the point Kernels (VISIPLAN) and Monte Carlo (MCNP4C) methods

    International Nuclear Information System (INIS)

    Slavik, O.; Kucharova, D.; Listjak, M.; Fueloep, M.

    2008-01-01

    The aim of this paper is to evaluate maximal dose rate (DR) of gamma radiation above different configurations of reservoirs with spent nuclear fuel with cooling period 1.8 year and to compare by buildup factor method (Visiplan) and Monte Carlo simulations and to appreciate influence of scattered photons in the case of calculation of fully filled fuel transfer storage (FTS). On the ground of performed accounts it was shown, that relative contributions of photons from adjacent reservoirs are in the case buildup factor method (Visiplan) similar to Monte Carlo simulations. It means, that Visiplan can be used also for valuation of contributions of of dose rates from neighbouring reservoirs. It was shown, that calculations of DR by Visiplan are conservatively overestimated for this source of radiation and thickness of shielding approximately 2.6 - 3 times. Also following these calculations resulted, that by storage of reservoirs with cooling period 1.8 years in FTS is not needed any additional protection measures for workers against primal safety report. Calculated DR also above fully filled FTS by these reservoirs in Jaslovske Bohunice is very low on the level 0.03 μSv/h. (authors)

  16. Calculation of radiation dose rate above water layer of Interim Spent Fuel Storage Jaslovske Bohunice by the point Kernels (VISIPLAN) and Monte Carlo (MCNP4C) methods

    International Nuclear Information System (INIS)

    Slavik, O.; Kucharova, D.; Listjak, M.; Fueloep, M.

    2009-01-01

    The aim of this paper is to evaluate maximal dose rate (DR) of gamma radiation above different configurations of reservoirs with spent nuclear fuel with cooling period 1.8 year and to compare by buildup factor method (Visiplan) and Monte Carlo simulations and to appreciate influence of scattered photons in the case of calculation of fully filled fuel transfer storage (FTS). On the ground of performed accounts it was shown, that relative contributions of photons from adjacent reservoirs are in the case buildup factor method (Visiplan) similar to Monte Carlo simulations. It means, that Visiplan can be used also for valuation of contributions of of dose rates from neighbouring reservoirs. It was shown, that calculations of DR by Visiplan are conservatively overestimated for this source of radiation and thickness of shielding approximately 2.6 - 3 times. Also following these calculations resulted, that by storage of reservoirs with cooling period 1.8 years in FTS is not needed any additional protection measures for workers against primal safety report. Calculated DR also above fully filled FTS by these reservoirs in Jaslovske Bohunice is very low on the level 0.03 μSv/h. (authors)

  17. Design of NPP of new generation being constructed at the Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitsky, V.

    1999-01-01

    The design of a new generation NPP is described, underscoring advances in physical attributes and passive safety systems based on experiences with earlier designs at operating NPPs. This paper elaborates on systems for handling and storing radioactive wastes, on refinements in containment measures and on experimental and analytic validation of critical design factors. (author)

  18. Feasibility study for NPP Mochovce Units 3 and 4 completion

    International Nuclear Information System (INIS)

    Tomik, L.; Chakraborty, S.; Hoffelner, W.; Stoian, A.

    2004-01-01

    The system dynamic approach presented in this study by modelling the behaviour of Slovak market on the basis of system dynamic model (Forrester model), enables real mix in the extend of 12 years and helps understanding of the market limits. In addition this tool can be used for sensitivity calculations depending on many parameters to develop possible trends in the economic development of the Slovak Republic. If both nuclear power options are maintained then it becomes obvious that electric excess energy is produced and could be exported. This export option remains for the situation that a strong growth of the gross national product is assumed without any increase in energy efficiency. Between these extremes is the scenario that Bohunice 1, 2 off is balanced by Mochovce 3, 4 on and increasing demand this will lead to more moderate but still not negligible potential of CO 2 increase. Switching off Bohunice 1, 2 and not switching on Mochovce 3, 4 leads to energy need which must be counterbalanced either by investments in other power plants or by import energy. As far as domestic production is concerned even assuming 50 % CHP production leads to partly remarkable additional CO 2 -production which might infringe on a long term basis with the Kyoto goals. Assuming additional CO 2 -emissions from increasing traffic real problems can be expected in such a case. To maintain national nuclear capabilities in Slovakia is very important for today and for future of nuclear energy option in enlarged European Union. (authors)

  19. Jpss System Architecture Npp to the Future

    Science.gov (United States)

    Furgerson, J.; Trumbower, G.

    2012-12-01

    The National Oceanic and Atmospheric Administration (NOAA) is acquiring the next-generation weather and environmental satellite system, named the Joint Polar Satellite System (JPSS). The National Aeronautics and Space Administration (NASA) serves as the acquisition and development agent. JPSS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA in the 1330 local time of ascending node (LTAN) orbit. The Suomi National Polar-orbiting Partnership (NPP) was launched into the 1330 LTAN orbit on October 28, 2011, and carries advanced sensors which will be featured on JPSS. It serves as a bridge mission and provides continuity for the NASA Earth Observation System and the POES. JPSS-1 is scheduled to launch in 2017. The Defense Meteorological Satellite Program (DMSP) managed by the DoD is operating in the 1730 LTAN orbit. The DoD is developing the Defense Weather Satellite Follow-on (WSF) system which will continue in the 1730 orbit. NASA is developing the Common Ground System (CGS) with the capability to process data from both the JPSS and WSF constellations. The CGS will be operated by NOAA. This poster will provide a top level status update of the program, as well as an overview of the JPSS system architecture. The space segment carries a suite of sensors that collect meteorological, oceanographic, and climatological observations of the earth and atmosphere. The system design allows centralized mission management and delivers high quality environmental products to military, civil and scientific users through a Command, Control, and Communication Segment (C3S). The data processing for NPP/JPSS is accomplished through an Interface Data Processing Segment (IDPS)/Field Terminal Segment (FTS) that processes NPP/JPSS satellite data to provide environmental data products to NOAA and DoD processing centers as well as remote terminal users.

  20. Corporate portal system at PAKS NPP, Hungary

    International Nuclear Information System (INIS)

    2009-01-01

    The new Corporate Portal System (CPS) of Paks NPP was launched in November 2006. The portal is based on one of the latest technologies, Plumtree Enterprise WEB 5.0. The main purpose of the installation of the new technology was to serve the working culture change, to give a platform to access all information and applications including the integrated process model used at the NPP. The new technology also supports those goals which were defined in the organization development programme: e.g. to improve internal communication with the establishment of communities of practice. Installation of the CPS has provided a powerful tool for knowledge management; it is possible to share and find all information through a controlled access in documents from various sources, to have links to people, portlets and different communities. Document management of the Paks NPP is supported by the integration of the Document 5 application, as the new Electronic Data Management System (EDMS) and the CPS. Depending on their access rights, all users of the CPS, through Microsoft Internet Explorer, can access technical, economic and human resources documents which are stored anywhere on the internal network (file servers, EDMS, old INRANET). The CPS is also accessible from the internet through a secure connection. The main concept is the integration of all applications to one platform and to help users to find all information they need. An access control list specifies which users and groups have access to an object (and what kind of access privileges they have such as read, select, edit, admin)

  1. Strategy for decommissioning of NPP's in Germany

    International Nuclear Information System (INIS)

    Rittscher, D.; Sterner, H.

    2003-01-01

    According to German Atomic Law, two different strategies are possible, i.e. direct dismantling and safe enclosure before dismantling. Both approaches have their advantages and disadvantages. Taking into account the site and plant specific conditions the optimal strategy can be evaluated. Both approaches have been applied in Germany in the past. The German Atomic Law and the Radiation Protection Ordinance (June 2002) were adapted recently (July 2002). Additionally, the life operation time of the German NPP's was fixed in a new law (April 2002): Orderly Termination of the Commercial Production of Nuclear Electricity. These issues have made it necessary for the power utilities to review the strategies applied. As long as the final disposal in Germany is still an open issue, the construction of local Interim Stores is necessary to be able to dismantle a NPP. The basic strategies are not excluding each other and it seems clear today, that the optimal approach is a combination of these strategies, e.g. dismantling of all auxiliary systems and leaving activated parts for a longer SE period. Within this approach the advantages of both basic strategies have been integrated in one. The EWN GmbH has developed such integrated but still different approaches for the decommissioning projects of the Kernkraftwerke Greifswald (KGR) and the Arbeitsgemeinschaft Versuchsreaktor (AVR) Juelich. It can be stated that the decommissioning of a NPP does not present technical issues of concern, but is more a project management issue, although surrounded by sometime intricate political and juridical boundary conditions. A major strategy change is to be expected only when final disposal capacities are available in the future. (authors)

  2. Contamination control by laundry monitor at NPP

    International Nuclear Information System (INIS)

    Singh, Vishwanath P.; Rana, P.K.; Lokeshwar Rao, S.; Managanvi, S.S.

    2010-01-01

    The operation of nuclear power reactor produces electricity as well as small quantity of radioactive waste as gaseous, liquid and solid. The waste contains radionuclides produced by fission and activation in reactor systems with wide spectrum of energy and half life. The long-lived nuclides Sr, Cs, Ba, Iodine and Co etc compared to short-lived are important in view of radiation protection. The radioactive contamination on the materials, human body or other places where it is undesirable is enormously harmful to workers at Nuclear Power Plant (NPP). The spread of radioactive from controlled areas is very complex problem for power reactor plant management

  3. Preparation of NPP Dukovany periodic safety review

    International Nuclear Information System (INIS)

    Dubsky, L.; Vymazal, P.

    2004-01-01

    Dukovany NPP in Czech Republic performs a periodic safety review for the second time after approximately 20 years of operation. The history of the Safety Report and its transformation into an internationally accepted form complying with IAEA standards is described. The deterministic and probabilistic assessment of the plant's safety-related design and state is applied to determine whether and to what extend the relevant protective goals are fulfilled by the existing plant design. A description of the step-by-step process is presented together with the creation of methods and criteria for PSR evaluation prepared by Nuclear Research Institute Rez

  4. Chernobyl NPP accident: a year later

    International Nuclear Information System (INIS)

    Asmolov, V.G.; Borovoj, A.A.; Demin, V.F.

    1988-01-01

    Consideration is being given to measures on liquidation of Chernobyl accident aftereffects, conducted since August, 1986. One of the most important measures lay in construction of the ''shelter'', which must provide long-term conservation of accidental unit. Works on decontamination of reactor area and contaminated populated regions were continued. Measures on providing safety of population and its health protection were performed. An attention was paid to long-term investigations on studying delayed aftereffects of the accident, monitoring of invironment, development and introduction of measures on improving NPP safety. Prospects of further development of nuclear power engeneering and possibilities of improving its safety are considered

  5. WWER-type NPP spray ponds screen

    International Nuclear Information System (INIS)

    Nikolova, M.; Jordanov, M.; Denev, J.; Markov, D.

    2003-01-01

    The objective of this study is to develop a protection screen of WWER-type NPP spray ponds. The screen design is to ensure reduction of the water droplets blown by the wind and, if possible, their return back to the spray ponds. The cooling capacity of the ponds is not to be changed below the design level for safety reasons. Computational fluid dynamics analysis is used to assess the influence of each design variant on the behavior of the water droplets distribution. Two variants are presented here. The one with plants is found not feasible. The second variant, with steel screen and terrain profile modification is selected for implementation. (author)

  6. The accidents during shutdown conditions Temelin NPP

    International Nuclear Information System (INIS)

    Sykora, M.; Mlady, O.

    1996-01-01

    Two parallel activities oriented for the accidents during shutdown conditions are performed at Temelin NPP: Development of symptom based emergency operating procedures (EOPs) applicable for the accidents which could occur during operational modes 1 through 4; independent evaluation of plant safety as part of the Temelin Shutdown probabilistic assessment to define the accidents which could occur during mode 5 and 6 for which the EOPs must be extended. Both these activities are in progress now because Temelin plant is still in the construction phase

  7. Experience in exchanging pipes in NPP containments

    International Nuclear Information System (INIS)

    Russell, D.J.

    1987-01-01

    Very careful planning and scheduling of NPP retrofit projects involving replacement of piping, valves, pumps and steam generators is essential. To meet the schedule, the approved design engineering documents must be prepared in good time. A viable electronic data processing program must be adopted to track progress and feedback on-site, and care must be exercised during the last phase of the project, i.e. in preparation of the documentation packages. In addition, there must be training of a sufficient number of skilled and responsible personnel, and all necessary job positions must be manned adequately, with close attention paid to health physics

  8. Safe 15 Terawatt of Temelin NPP

    International Nuclear Information System (INIS)

    Sula, M.

    2010-01-01

    In this work author presents a project Safe 15 Terawatt realised on the Temelin NPP. This project is one of the eight key projects of the CEZ group, associated in the 'Programme of efficiency'. The project started in June 2007 with long-term goals for horizon of year 2012. The safety indicators will be reached of the first quarter level of world's nuclear power plant - by the end of the first decade. By the end of year 2012 we will have achieved annual production of 15 billion kWh - in the Czech Republic: 15 Terawatt.

  9. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  10. Social consequences of closing the Ignalina NPP

    International Nuclear Information System (INIS)

    Baubinas, R.; Burneika, D.

    2001-01-01

    The possible social consequences of closing the Ignalina Nuclear Power Plant are studied. The social and economical situation in Visaginas and in the Utena region as a precondition for possible social consequences is shown. Also, two main groups of factors that can possibly influence the situation in the labour market are analysed. The problems of the enterprises that create working places and of the inhabitants of Visaginas whose possible behaviour can affect the situation in the labour market are discussed. Also, some proposals to neutralize the social costs of closing the Ignalina NPP are made. (author)

  11. Characterization of Ignalina NPP RBMK Reactors Graphite

    International Nuclear Information System (INIS)

    Hacker, P.J.; Neighbour, G.B.; Levinskas, R.; Milcius, D.

    2001-01-01

    The paper concentrates on the investigations of the initial physical properties of graphite used in production of graphite bricks of Ignalina NPP. These graphite bricks are used as nuclear moderator and major core structural components. Graphite bulk density is calculated by mensuration, pore volumes are measured by investigation of helium gas penetration in graphite pore network, the Young's modulus is determined using an ultrasonic time of flight method, the coefficient of thermal expansion is determined using a Netzsch dilatometer 402C, the fractured and machined graphite surfaces are studied using SEM, impurities are investigated qualitatively by EDAX, the degree of graphitization of the material is tested using X-ray diffraction. (author)

  12. Students education and training for Slovak NPP

    International Nuclear Information System (INIS)

    Lipka, J.; Slugen, V.; Hascik, J.; Miglierini, M.

    2004-01-01

    Slovak University of Technology is the largest and also the oldest university of technology in Slovakia. Surely more than 50% of high-educated technicians who work nowadays in nuclear industry have graduated from this university. The Department of Nuclear Physics and Technology of the Faculty of Electrical Engineering and Information Technology as a one of seven faculties of this University feels responsibility for proper engineering education and training for Slovak NPP operating staff. The education process is realised via undergraduate (Bc.), graduate (MSc.) and postgraduate (PhD.) study as well as via specialised training courses in a frame of continuous education system. (author)

  13. Core power capability verification for PWR NPP

    International Nuclear Information System (INIS)

    Xian Chunyu; Liu Changwen; Zhang Hong; Liang Wei

    2002-01-01

    The Principle and methodology of pressurized water reactor nuclear power plant core power capability verification for reload are introduced. The radial and axial power distributions of normal operation (category I or condition I) and abnormal operation (category II or condition II) are simulated by using neutronics calculation code. The linear power density margin and DNBR margin for both categories, which reflect core safety, are analyzed from the point view of reactor physics and T/H, and thus category I operating domain and category II protection set point are verified. Besides, the verification results of reference NPP are also given

  14. Mochovce NPP safety improvement and completion

    International Nuclear Information System (INIS)

    1997-01-01

    6th Nuclear society information meeting dealt with the completion of the Mochovce NPP with regard to implementation of safety measures. It was aimed to next problems: I. 'Survey' presentation on the situation of the nuclear power industry in partner countries; II. Basic technical presentations; III. Presentations of operators of the other VVER 440/213 NPPs on their activities in the field of safety improvement in relation to IAEA recommendations; IV. Technical solutions of safety improvements ranked with IAEA degree 3 (Report SC 108 VVER); V: Technical solutions of selected Safety Measures ranked with IAEA degree 2 and 1 (Report SC 108 VVER)

  15. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  16. Nuclear Oversight Function at Krsko NPP

    International Nuclear Information System (INIS)

    Bozin, B.; Kavsek, D.

    2010-01-01

    The nuclear oversight function is used at the Krsko NPP constructively to strengthen safety and improve performance. Nuclear safety is kept under constant examination through a variety of monitoring techniques and activities, some of which provide an independent review. The nuclear oversight function at the Krsko NPP is accomplished by Quality and Nuclear Oversight Division (SKV). SKV has completed its mission through a combination of compliance, performance and effectiveness-based assessments. The performance-based assessment is an assessment using various techniques (observations, interviews, walk-downs, document reviews) to assure compliance with standards and regulations, obtain insight into performance, performance trends and also to identify opportunities to improve effectiveness of implementation. Generally, the performance-based approach to oversight function is based on some essential elements. The most important one which is developed and implemented is an oversight program (procedure). The program focuses on techniques, activities and objectives commensurate with their significance to plant operational safety. These techniques and activities are: self-assessments, assessments, audits, performance indicators, monitoring of corrective action program (CAP), industry independent reviews (such as IAEA's OSART and WANO Peer Review), industry benchmarking etc. Graded approach is an inherent product of a performance based program and ranking process. It is important not only to focus on the highest ranked performance based attributes but to lead to effective utilization of an oversight program. The attributes selected for oversight need to be based on plant specific experience, current industry operating experience, supplier's performance and quality issues. Collaboration within the industry and effective utility oversight of processes and design activities are essential for achieving good plant performance. So the oversight program must integrate relevant

  17. Sociological investigations on Ignalina NPP and within its surroundings

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The purpose of this study was to determine the impact of Ignalina NPP and Visaginas town on the social territorial processes in the region and to reveal the impact of Ignalina NPP on the regional economic, social, demographic, political and cultural processes in the context of ecological and psychological affect. According to the results of this research three quarters of the inhabitants and the functionaries of local administration hold an opinion that operation of Ignalina NPP posses threat for the population and environment. Meanwhile they are sure that danger of Ignalina NPP is not critical. 21 - 35 % of the local administrators speak for the closure of Ignalina NPP , whereas half of Visaginas residents and three quarters of the local administrators indicate that operation of reactors is expedient. Over 90% of the population do not have sufficient information on the operation of Ignalina NPP. In the opinion of the rest Lithuanian people Ignalina NPP zone is related with the physical danger and the image of Visaginas residents as the 'others', 'strangers'. More than 90% of Ignalina NPP employees are Russian speaking, not native Lithuanians. The social relations of Visaginas with the environment are poor as a result of the situation of the town, lack of communications and cultural self isolation. (author)

  18. Selection of index complex for the NPP operator activity efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Kolesnik, A I; Chertorizhskij, E A

    1984-01-01

    Preconditions for choice of NPP operator activity efficiency index are determined. Results of the choice are given and a method for determination of generalized and particular parameters by means of which NPP operator activity efficiency can be estimated is considered. An algorithm of diagnosis of reason for unsuccess of operator activity based on assessment of psychological factors of complicacy is suggested.

  19. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  20. NPP electrical price and tariff in the world

    International Nuclear Information System (INIS)

    Mochamad Nasrullah and Sriyana

    2010-01-01

    Construction of a Nuclear Power Plant (NPP) is always become a controversial issue. Nuclear utility and other party which support the NPP present a calculation of NPP electricity cost too optimistic. However for utility and other party that contra to nuclear present a calculation of NPP electricity cost too pessimistic. This study present to reduce the controversy of nuclear cost. In this study, capital cost (Engineering Procurement Construction, EPC) was taken from Asian, America and Europe, operating and maintenance cost uses experience data of PLN, and nuclear fuel cost uses data year of 2008 with high price, low price and average price scenario. The methodological tools used to compare electricity generation cost was LEGECOST, a program developed by IAEA (International Atomic Energy Agency), while for electricity tariff- price calculation using a program developed by PLN research and development center. With the discount rate 10%, the result shows that the cheapest electricity generation cost of NPP is less than 40 mills/kWh, and average electricity tariff was 55 mills/kWh. In the Europe countries the electricity tariff more expensive than NPP in Asia. However generating cost and electricity tariff of NPP in United Stated of America (USA) less competitive because investment cost more expensive. Generating cost and electricity tariff was different at each country depend on salary, labor wage, materials price, construction specification, regulation related to NPP and environment aspect. (author)

  1. Transition cycle fuel management problems of NPP Krsko

    International Nuclear Information System (INIS)

    Petrovic, B.; Pevec, D.; Smuc, T.; Urli, N.

    1989-01-01

    Transition cycle fuel management problems are described and illustrated using results and experience attained during core reload design of NPP Krsko. Improved version of computer code package PSU-LEOPARD/Mcrac is successfully applied to NPP Krsko loading pattern design. (author)

  2. Using the digital reactor control systems at NPP

    International Nuclear Information System (INIS)

    Schirl, G.; Hertel, J.

    2006-01-01

    A conception of application of the digital reactor control systems (RCS) at NPP is presented. The digital RCS architecture and safety ensuring are considered. The strategy and algorithm of the operating NPP equipping with the new digital RCS are given too [ru

  3. Use of NESTLE computer code for NPP transition process analysis

    International Nuclear Information System (INIS)

    Gal'chenko, V.V.

    2001-01-01

    A newly created WWER-440 reactor model with use NESTLE code is discussed. Results of 'fast' and 'slow' transition processes based on it are presented. This model was developed for Rovno NPP reactor and it can be used also for WWER-1000 reactor in Zaporozhe NPP

  4. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  5. Project No. 10 - Partial restoration of Ignalina NPP territory

    International Nuclear Information System (INIS)

    2000-01-01

    At present Ignalina NPP territory makes a total of 2544 ha of land. Due to termination of construction activity development and due to the decision taken to shutdown unit 1 the need in such a territory fell off. For normal and safe operation of Ignalina NPP 1440 ha is enough, including 1237 ha for of Ignalina NPP administrative area and 203 ha for auxiliary objects. Ignalina NPP will have to rearrange territory, forestry that was damaged during the construction activities of the plant and to restore the damaged farmlands and to pass the rearranged forestry that belonged to the Ignalina NPP to the Ministry of Forestry. The total estimated cost of the project is about 1.042 M EURO

  6. Economical aspect of the decommissioning for NPP

    International Nuclear Information System (INIS)

    Daryoko, M.

    1998-01-01

    The estimated, analysed and founding of the economical aspect at decommissioning of Nuclear Power Plant (NPP) have been studied. The data that have been obtained from literature, then the calculation and analysing have been done base to the future condition. The cost for NPP decommissioning depend on the internal factor such as type, capacity and safe storage time, and the external factor such as policy, manpower and the technology preparation. The successfulness of funding, depend on the rate of inflation, discount rate of interest and the currency fluctuation. For the internal factor, the influence of the type of the reactor (BWR or PWR) to the decommissioning cost is negligible, the big reactor capacity (±1100 MW), and the safe storage between 30 to 100 years are recommended, and for the external factor, specially Indonesia, to meet the future need the ratio of decommissioning cost and capital cost will be lower than in develop countries at the present (10%). The ratio between decommissioning fund and electricity generation cost relatively very low, are more less than 1.79 % for 30 years safe storage, and discount rate of interest 3%, or more less than 0.30 % for safe storage 30 years, and discount rate of interest 6%. (author)

  7. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  8. Plant lifetime management at Jose Cabrera NPP

    International Nuclear Information System (INIS)

    Martin, Jorge; Garcia, Piedad

    1998-01-01

    This paper presents the results obtained during the development and implementation of the Jose Cabrera NPP Lifetime Management Program according to the methodology applied in the Plant. The implementation of the Lifetime Management Program began in 1995 with the elaboration of the annual revision document 'Lifetime Management Plan', which describes the level of development of the Lifetime Management activities, the results that have been obtained during the implementation of the Program, and the schedule of the upcoming activities. The drawing up of a weighted list of 135 important components and the elaboration of 17 dossiers integrating the ageing mechanisms analysis and its corresponding evaluation, control and mitigation methods, were the result of the activities completed during 1996. A group of 62 component/degradation phenomena pairs with a high degradation risk classification has been considered within the scope of the activity 'Assessment of Maintenance Practices. Improvement Proposal', performed by the plant during 1997 and the first term of 1998 in parallel with other Lifetime Management related activities. The results obtained within this activity have revealed for the components included in the scope of the assessment that the associated degradation phenomena are practically covered by the current maintenance, inspection and testing practices. Recommendations and improvements of the maintenance practices have been particularly proposed from a technical, supporting, proceeding and documentary point of view, and currently an analysis is being made in relation to the feasibility of implementing them at the Jose Cabrera NPP. (author)

  9. NPP unusual events: data, analysis and application

    International Nuclear Information System (INIS)

    Tolstykh, V.

    1990-01-01

    Subject of the paper are the IAEA cooperative patterns of unusual events data treatment and utilization of the operating safety experience feedback. The Incident Reporting System (IRS) and the Analysis of Safety Significant Event Team (ASSET) are discussed. The IRS methodology in collection, handling, assessment and dissemination of data on NPP unusual events (deviations, incidents and accidents) occurring during operations, surveillance and maintenance is outlined by the reports gathering and issuing practice, the experts assessment procedures and the parameters of the system. After 7 years of existence the IAEA-IRS contains over 1000 reports and receives 1.5-4% of the total information on unusual events. The author considers the reports only as detailed technical 'records' of events requiring assessment. The ASSET approaches implying an in-depth occurrences analysis directed towards level-1 PSA utilization are commented on. The experts evaluated root causes for the reported events and some trends are presented. Generally, internal events due to unexpected paths of water in the nuclear installations, occurrences related to the integrity of the primary heat transport systems, events associated with the engineered safety systems and events involving human factor represent the large groups deserving close attention. Personal recommendations on how to use the events related information use for NPP safety improvement are given. 2 tabs (R.Ts)

  10. Corrective action program at Krsko NPP

    Energy Technology Data Exchange (ETDEWEB)

    Skaler, F; Divjak, G; Kavsek, D [NPP Krsko, Krsko (Slovenia)

    2004-07-01

    The Krsko NPP develops software that enables electronic reporting of all kind of deviations and suggestions for improvement at the plant. All the employees and permanent subcontractors have the access to the system and can report deviations. NPP has centralized decision process for the distribution of reported deviation. At this point all direct actions are electronically tracked. The immediate benefits of this new tool were: Reporting threshold has been lowered; Number of reporting people has increased; One computerized form for all processes; Decision, which process will solve the deviation, is centralized; All types of deviation are in the same environment; Our experiences of the processes are incorporated in the program; Control of work that has been done; Archiving is electronic only. Software basic data: Application system Corrective action program is a WEB application. Data is stored in Oracle 8.1.7 i database. Users access application through PL/SQL gateway on Oracle 9i Application Server 1.0.2. using Microsoft Internet Explorer browsers(Version 5 or later). Reports are implemented by Oracle Reports 6i. Menus are designed by Apycom Java Menus and Buttons v4.23. Our Presentation will include: Basic idea; Implementation change management; Demonstration of the program.(author)

  11. Utilization of NPP Krsko plant specific simulator

    International Nuclear Information System (INIS)

    Fifnja, I.; Pribozic, F.; Krajnc, J.

    2002-01-01

    NPP Krsko started with licensed operator training using its own plant-specific full scope simulator in April 2000. Today, two years after simulator was completed, the benefits of simulator use are visible in various fields. The simulator was effectively used to conduct licensed operator continuing training and practical examinations. Two-year continuous training program was designed to help maintain and improve operator performance. The simulator was also used to provide just-in-time training prior to plant evolutions. Together with licensed operators the non-licensed operators are also included into simulator training to provide affective team training opportunity and to foster good communication and increase scenario realism. Now, the first group of initial licensed operator training using plant-specific simulator is also almost completed. It is the first time that NPP Krsko training department conducted complete initial training and this will represent the great experience for future training. Besides training, the simulator was also utilized for procedure development and validation, operating standards development, testing of plant modifications and other activities, like emergency preparedness procedures validation and training exercises.(author)

  12. Forsmark NPP I and C modernization strategy

    International Nuclear Information System (INIS)

    Hallen, J.; Rydahl, I.; Kloow, L.

    2003-01-01

    By the year 2000, the Forsmark NPP was halfway through the planned plant life. As early as 1995, Forsmark realized that the old analog I and C equipment would need to be replaced before 2005. At the Forsmark NPP they had strength of a vision of an integrated modernization and a strategy to reach the vision. Without vision and strategy, the plant could end up with a fragmented plant I and C-architecture that is not cost-effective or operable. This paper will address several questions that led to the current modernization program in Forsmark, the more important questions are: What would happen if the modernization would be postponed? Which main requirements were to be achieved by means of the modernization strategy? The goal of a completed plant modernization program is a totally integrated system solution and what factors were considered during the modernization? How to gain acceptance from the operational staff in designing Control Room and Soft Control Displays? What are the important roles for the staff and organization to reach the end goal? What has been the experience to date and what are the lessons learned? Thanks to the long term co-operation between Forsmark and Westinghouse the modernization has been very successful for both parties. (orig.)

  13. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  14. Fiddle at financing of Mochovce NPP

    International Nuclear Information System (INIS)

    Beer, G.

    2003-01-01

    Slovak police found out and documented racket in financing of third and fourth block of Mochovce NPP. Damage should be 144 millions Slovak crowns. Investigator consequently accused twenty-three Slovaks from foundation, trump up and supporting of criminal group and deception. Two persons are suggested to be taken to custody. Skoda Praha, which was general supplier of construction for 1,5 billions Slovak crowns, in 2001 allowed to create a connection to let the finances between Slovenske elektrarne, a.s., Bratislava as investor and Skoda as subcontractor to be paid through three mediator companies. Companies got authorization to balance the relationship among all interested subjects. Confused network of 118 treaties was created. They invoiced reward from money current based on these treaties. Reward represented up to 70 per cent of transferred resources in some cases. According to Minister of Domestic Affairs Vladimir Palko it will be necessary to find out where is actually the money. For the time being nobody from NPP is among accused. (Author)

  15. Brief Assessment of Krsko NPP Decommissioning Costs

    International Nuclear Information System (INIS)

    Skanata, D.; Medakovic, S.; Debrecin, N.

    2000-01-01

    The first part of the paper gives a brief description of decommissioning scenarios and models of financing the decommissioning of NPPs. The second part contains a review of decommissioning costs for certain PWR plants with a brief description of methods used for that purpose. The third part of the paper the authors dedicated to the assessment of decommissioning costs for Krsko NPP. It does not deal with ownership relations and obligations ensuing from them. It starts from the simple point that decommissioning is an structure of the decommissioning fund is composed of three basic cost items of which the first refers to radioactive waste management, the second to storage and disposal of the spent nuclear fuel and the third to decommissioning itself. The assessment belongs to the category of preliminary activities and as such has a limited scope and meaning. Nevertheless, the authors believe that it offers a useful insight into the basic costs that will burden the decommissioning fund of Krsko NPP. (author)

  16. Corrective action program at Krsko NPP

    International Nuclear Information System (INIS)

    Skaler, F.; Divjak, G.; Kavsek, D.

    2004-01-01

    The Krsko NPP develops software that enables electronic reporting of all kind of deviations and suggestions for improvement at the plant. All the employees and permanent subcontractors have the access to the system and can report deviations. NPP has centralized decision process for the distribution of reported deviation. At this point all direct actions are electronically tracked. The immediate benefits of this new tool were: Reporting threshold has been lowered; Number of reporting people has increased; One computerized form for all processes; Decision, which process will solve the deviation, is centralized; All types of deviation are in the same environment; Our experiences of the processes are incorporated in the program; Control of work that has been done; Archiving is electronic only. Software basic data: Application system Corrective action program is a WEB application. Data is stored in Oracle 8.1.7 i database. Users access application through PL/SQL gateway on Oracle 9i Application Server 1.0.2. using Microsoft Internet Explorer browsers(Version 5 or later). Reports are implemented by Oracle Reports 6i. Menus are designed by Apycom Java Menus and Buttons v4.23. Our Presentation will include: Basic idea; Implementation change management; Demonstration of the program.(author)

  17. Monitors for the surveillance of NPP components

    International Nuclear Information System (INIS)

    Giera, H.D.; Grabner, A.; Hessel, G.; Koeppen, H.E.; Liewers, P.; Schumann, P.; Weiss, F.P.; Kunze, U.; Pfeiffer, G.

    1985-01-01

    Noise diagnostics have reached a level where it is possible and efficient to integrate this method as far as possible into the control and safety system of the NPP. The communication between the noise diagnostic system and the plant operator is the main problem of integration. It is necessary to refine the diagnostic results in such a manner that the operator can use them without being skilled in noise analysis respectively without contacting a noise specialist. Moreover, in this way the noise specialist can be released from routine surveillance. For selected processes which have already intensively been investigated because of their inherent risk this can be achieved by means of autonomously working monitors. Independently the monitors perform signal processing and diagnosis. In general this means that they classify the technical condition of the monitored component into one of the two categories: ''normal'' or ''anomalous''. The result will be annunciated to the plant operator who will in the first step of the development contact the noise specialist only if anomalies have occurred in order to clarify the cause. At the NPP ''Bruno Leuschner'' Greifswald, three hardware monitors for loose parts detection, control rod surveillance and main coolant pump diagnosis are being tested. Additionally a so-called software monitor for diagnosing the pressure vessel vibrations is in preparation. The techniques and the hardware used for the monitors as well as planned further improvements of the integration of noise diagnostics into the control and safety system are discussed in this paper. (author)

  18. Can the Ignalina NPP be safe?

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Many countries started using nuclear power before Lithuania, the IAEA and NEA were established and have been functioning efficiently, numerous conventions have been signed that control nuclear activities, nuclear safety regulations and standards have been set. Lithuania which is striving to integrate into the West European structures and to become a member of the 'club' of the world's nuclear states, has become a full and equal member of the IAEA and recognises its recommendations. Furthermore, it has signed or joined international conventions and is doing its best to introduce the practice of controlling nuclear safety applied in western countries. Nuclear safety cannot be taken as something finite that does not change. The requirements of nuclear and radiation safety are continuously redefined taking into consideration scientific discoveries and inventions as well as technical progress. Safety assurance can be the only criterion that should determine whether the nuclear power plant can be operated in Lithuania. The safety analysis report confirmed that the Ignalina NPP can be safely operated until the channel-graphite gap closes. The experiments conducted to date have convincingly shown that by the year 2000 the gap will not close in any of the fuel channels of unit 1. It can be hoped that the submitted studies, analyses and assessments will confirm that the Ignalina NPP meets Lithuania's nuclear safety requirements that have been drawn up in compliance with the recommendations of IAEA

  19. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  20. Automated personal dosimetry monitoring system for NPP

    International Nuclear Information System (INIS)

    Chanyshev, E.; Chechyotkin, N.; Kondratev, A.; Plyshevskaya, D.

    2006-01-01

    Full text: Radiation safety of personnel at nuclear power plants (NPP) is a priority aim. Degree of radiation exposure of personnel is defined by many factors: NPP design, operation of equipment, organizational management of radiation hazardous works and, certainly, safety culture of every employee. Automated Personal Dosimetry Monitoring System (A.P.D.M.S.) is applied at all nuclear power plants nowadays in Russia to eliminate the possibility of occupational radiation exposure beyond regulated level under different modes of NPP operation. A.P.D.M.S. provides individual radiation dose registration. In the paper the efforts of Design Bureau 'Promengineering' in construction of software and hardware complex of A.P.D.M.S. (S.H.W. A.P.D.M.S.) for NPP with PWR are presented. The developed complex is intended to automatize activities of radiation safety department when caring out individual dosimetry control. The complex covers all main processes concerning individual monitoring of external and internal radiation exposure as well as dose recording, management, and planning. S.H.W. A.P.D.M.S. is a multi-purpose system which software was designed on the modular approach. This approach presumes modification and extension of software using new components (modules) without changes in other components. Such structure makes the system flexible and allows modifying it in case of implementation a new radiation safety requirements and extending the scope of dosimetry monitoring. That gives the possibility to include with time new kinds of dosimetry control for Russian NPP in compliance with IAEA recommendations, for instance, control of the equivalent dose rate to the skin and the equivalent dose rate to the lens of the eye S.H.W. A.P.D.M.S. provides dosimetry control as follows: Current monitoring of external radiation exposure: - Gamma radiation dose measurement using radio-photoluminescent personal dosimeters. - Neutron radiation dose measurement using thermoluminescent

  1. Report on Fukushima Daiichi NPP precursor events

    International Nuclear Information System (INIS)

    2014-01-01

    The main questions to be answered by this report were: The Fukushima Daiichi NPP accident, could it have been prevented? If there is a next severe accident, may it be prevented? To answer the first question, the report addressed several aspects. First, the report investigated whether precursors to the Fukushima Daiichi NPP accident existed in the operating experience; second, the reasons why these precursors did not evolve into a severe accident. Third, whether lessons learned from these precursor events were adequately considered by member countries; and finally, if the operating experience feedback system needs to be improved, based on the previous analysis. To address the second question which is much more challenging, the report considered precursor events identified through a search and analysis of the IRS database and also precursors events based on risk significance. Both methods can point out areas where further work may be needed, even if it depends heavily on design and site-specific factors. From the operating experience side, more efforts are needed to ensure timely and full implementation of lessons learnt from precursor events. Concerning risk considerations, a combined use of risk precursors and operating experience may drive to effective changes to plants to reduce risk. The report also contains a short description and evaluation of selected precursors that are related to the course of the Fukushima Daiichi NPP accident. The report addresses the question whether operating experience feedback can be effectively used to identify plant vulnerabilities and minimize potential for severe core damage accidents. Based on several of the precursor events national or international in-depth evaluations were started. The vulnerability of NPPs due to external and internal flooding has clearly been addressed. In addition to the IRS based investigation, the WGRISK was asked to identify important precursor events based on risk significance. These precursors have

  2. ATUCHA I NPP - Emergency drill practice

    International Nuclear Information System (INIS)

    Sanda, Alejandro; Rosales, Gabriel

    2008-01-01

    Full text: Atucha I NPP performs an Emergency Drill Practice once a year. Its main goals are: -) Fulfill the requirements of the Argentine Nuclear Regulatory Authority (ARN) regarding Atucha I NPP's Operating License; -) Fulfill the commitment with the community regarding the safe and reliable operation Atucha I NPP; -) Verify the response of the Civil Organizations, Security Forces, and Armed Forces, as well as the correct application of the Emergency Plan; -) Perform the 'General Alarm Drill' periodic control; -) Perform a re-training of the members of the Security Advisor Internal Committee (CIAS) on the Internal and External Aspects of the Emergency Plan and on the related procedures; -) Test the Emergency Communications System. New goals are added every year, considering the Drill's scope. This drill comprises two different kinds of practices: Internal practices (practices in the station, with our personnel) and external practices (practices outside the station with governmental organizations). Internal practices comprise: -) Internal and external communications practices; -) Acoustic alarms; -) Personnel gathering in the Meeting Points; -) Safety of selected Meeting Points; -) Personnel count, selective evacuation; -) Iodide Potassium pills distribution; -) CICE (Internal Group for Emergency Control) Coordination. External practices comprise: -) Nuclear Regulatory Authority; -) Argentine Navy, Comando Area Naval Fluvial, Base Naval Zarate; -) Lima firemen; -) Zarate firemen; -) Municipal Civil Defense (Zarate and Lima); -) National Guard, Escuadron Atucha; -) Zarate Regional Hospital; -) Lima Police Department; -) Zarate Police Department; -) Argentine Coast Guard, Zarate; -) Local radios: Radio FM Libre, FM El Sitio; -) First Aid clinic. The following activities are performed together with the aforementioned organizations: -) Formation of an 'Operative committee'; -) Evacuation of citizens in a 3 km radio; -) Control of every access to Lima; -) Control of

  3. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  4. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  5. NPP Krsko Containment Response Following Main Steam Line Break

    International Nuclear Information System (INIS)

    Spalj, S.; Grgic, D.; Cavlina, N.

    2000-01-01

    This paper presents the calculation of thermohydraulic environmental parameters (pressure and temperature) inside containment of Krsko NPP after postulated Main Steam Line Break (MSLB) accident. This analysis was done as a part of the ambient parameters specification in the frame of the NPP Krsko Equipment Qualification (EQ) project. The RELAP5/mod2 computer code was used for the determination of MSLB mass and energy release and computer code GOTHIC was used to calculate pressure and temperature profiles inside NPP Krsko containment. The analysis was performed for spectrum of break sizes to account for possible steam superheating during accidents with smaller break sizes. (author)

  6. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  7. A reliability evaluation method for NPP safety DCS application software

    International Nuclear Information System (INIS)

    Li Yunjian; Zhang Lei; Liu Yuan

    2014-01-01

    In the field of nuclear power plant (NPP) digital i and c application, reliability evaluation for safety DCS application software is a key obstacle to be removed. In order to quantitatively evaluate reliability of NPP safety DCS application software, this paper propose a reliability evaluating method based on software development life cycle every stage's v and v defects density characteristics, by which the operating reliability level of the software can be predicted before its delivery, and helps to improve the reliability of NPP safety important software. (authors)

  8. Construction of Belene NPP in Bulgaria

    International Nuclear Information System (INIS)

    JSC Atomstroyexport

    2010-01-01

    Presentations concluding remarks: ASE has performed its scope of responsibilities under the Agreement of 29.11.2006 and has achieved great results regarding both the Technical part of the Project and its organization; Though there is a number of unsettled issues under the Project, in particular, the issue related to financing, ASE is willing to continue the Project and works on its development; The Russian Party believes that in case the activities under the Project are continued, Belene NPP will be constructed with high quality and within the time limits prescribed in the Agreement of 29.11.2006: 59 months before Unit 1 take-over into operation and 71 month before Unit 2 take-over into operation, starting from concreting of foundation slab of Unit 1 Reactor building

  9. Crushed stone production plant for NPP building

    International Nuclear Information System (INIS)

    Obolenskij, V.Ya.

    1982-01-01

    The project of the granite-crushed stone quarry - the large modern plant producing building materials, is presented. The quarry is designated for providing NPP and other power objects building with high-strength crushed stone. The plant consists of: quarry; crushing-sorting plant with maintenance objects arranged on its ground; basis and service stores of explosive materials; tail facility and purifying systems; water supply purifying stations; water storage basin. The plant is reserved for 2335 thousand m 3 yearly utoput of crushed stone; the staff consists of 535 persons, the budgeted cost of building is 26.6 million rubles. Physicochemical characteristics of granosyenites of the ''Granitnoye'' deposit - the raw material resource base of the plant and technological scheme of the crushing-sorting plant are given. Planned measures on building organization and recultivation of disturbed grounds are presented

  10. Students education and training for Slovak NPP

    International Nuclear Information System (INIS)

    Slugen, V.; Lipka, J.; Hascik, J.; Miglierini, M.

    2005-01-01

    Slovak University of Technology is the largest and also the oldest university of technology in Slovakia. It is certain that more than 50% of the highly-educated technicians who are currently working in the nuclear industry have graduated from this university. The Department of Nuclear Physics and Technology of the Faculty of Electrical Engineering and Information Technology as one of the seven faculties of this University feels the responsibility to impart proper engineering education and training for Slovak NPP operating staff. The education process is realised via undergraduate (BSc), graduate (MSc) and postgraduate (PhD) study as well as via specialised training courses within the framework of a continuous education system. (author)

  11. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    Experience has shown that number of minor events and near misses, usually without immediate or significant impact to plant safety and reliability, are precursors of significant or severe events due to the same or similar root or apparent cause(s). It is therefore desirable to identify and analyze weaknesses of the precursor problems (events) in order to prevent occurrence of significant events. Theoretically, significant events could be prevented from occurring if the root cause(s) of these precursor problems could be identified and eliminated. The Operating Experience Program identifies such event precursors and by reporting them to the industry, plant specific corrective actions can be taken to prevent events at other operational plants. The intent of the Operating Experience Program is therefore to improve nuclear power plant safety and reliability of the operating nuclear power plants. Each plant develops its own Operating Experience Program in order to learn from the in-house operating experience as well as from the world community of nuclear plants. The effective use of operating experience includes analyzing both plant and industry events in order to identify fundamental weaknesses and then determining appropriate plant-specific actions that will minimize the likelihood of similar events. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed it own Operating Experience Program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The Operating Experience Program is a part of the Corrective Action Program, which is among top management programs, thus program is strongly encouraged by top management. The purpose of Operating Experience Program is to provide guidance for using, sharing, and evaluating operating experience information

  12. N-16 monitors: Almaraz NPP experience

    International Nuclear Information System (INIS)

    Adrada, J.

    1997-01-01

    Almaraz Nuclear Power Plant has installed N-16 monitors - one per steam generator - to control the leakage rate through the steam generator tubes after the application of leak before break (LBB) criteria for the top tube sheet (TTS). After several years of operation with the N-16 monitors, Almaraz NPP experience may be summarized as follows: N-16 monitors are very useful to follow the steam generator leak rate trend and to detect an incipient tube rupture; but they do not provide an exact absolute leak rate value, mainly when there are small leaks. The evolution of the measured N-16 leak rates varies along the fuel cycle, with the same trend for the 3 steam generators. This behaviour is associated with the primary water chemistry evolution along the cycle

  13. Environmental qualification program for Krsko NPP

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Freeland, K.R.; Spalj, S.

    1998-01-01

    NEK plant components, including those critical to safe plant operation, deteriorate and wear over service life due to the effects of aging and harsh environmental conditions. Since the plant environment is a source of common-cause failures, an Environmental Qualification (EQ) program is required to ensure and demonstrate the ability of safety-related equipment to perform its design safety function during a design-basis (DBE), even after aging over its service life in the plant. EQ is a requirement for plants licensed by the US NRC, in accordance with 10 CFR 50.49, Regulatory Guide 1.89, NUREG-0588, and IEEE-323. This paper presents the current EQ Program status at Krsko NPP.(author)

  14. Fuel consumption organization at the Kola NPP

    International Nuclear Information System (INIS)

    Matveev, A.A.; Ignatenko, E.I.; Volkov, A.P.; Trofimov, B.A.

    1981-01-01

    Problems of using NPPs in the power systems including hydroelectric power plants and NPPs are considered on the example of the Kola power system. The methods of the WWER-440 reactor fuel loading formation, reactor power forcing, optimization of volumes and time of the NPP main equipment planned maintenance are discussed. It is concluded that the optimal methods for the WWER-440 reactor fuel loading formation are the following: reactor make-up with the lesser number of fuel assemblies with maximum designed enrichment; for the case of decreased loading energy capacity displacement of make-up fuel with 2.4% enrichment by the fuel with 3.6% enrichment when preserving the designed number of make-up fuel assemblies [ru

  15. Feature article. Fukushima Daiichi NPP accident

    International Nuclear Information System (INIS)

    Ekarinai, Masashi; Ake, Yutaka; Narabayashi, Tadashi

    2011-01-01

    This special feature article consisted of five reports and the minutes of emergency discussion meeting on Fukushima Daiichi Nuclear Power Plant (NPP) accident. Effects of the accident on future electricity supply of electric utilities and also on business development of nuclear industries were discussed. Activities of senior network team of atomic energy society of Japan (AESJ) to conduct severe accident analysis and early restoration from the accident were introduced. Circulating injection reactor cooling system and zeolite decontamination system of accumulated contaminated water was proposed. Effects of the accident on overseas reaction on nuclear development were also reported as well as personal experience of the professor in the US west coast on communications. (T. Tanaka)

  16. Features of the Kozloduy NPP management system

    International Nuclear Information System (INIS)

    2016-01-01

    The Kozloduy NPP management system was built taking into account the specifics of the organizational structure and management of the Company, actual processes and practices, and is oriented towards future development, with the participation of all staff. Additional requirements integrated in the system that distinguish it from general industrial requirements of management systems are: priority of nuclear safety; safety culture; knowledge management including extraction and storage of 'hidden knowledge'; periodic self-assessments; use of graded response to the products and activities; use of 'conservative approach' in decision making;; possibilities for self learning and creating of a vision of 'leaders' and 'professional workers in nuclear energy

  17. Seismic analysis and design of NPP structures

    International Nuclear Information System (INIS)

    de Carvalho Santos, S.H.; da Silva, R.E.

    1989-01-01

    Numerical methods for static and dynamic analysis of structures, as well as for the design of individual structural elements under the applied loads are under continuous development, being very sophisticated methods nowadays available for the engineering practice. Nevertheless, this sophistication will be useless if some important aspects necessary to assure full compatability between analysis and design are disregarded. Some of these aspects are discussed herein. This paper presents an integrated approach for the seismic analysis and design of NPP structures: the development of models for the seismic analysis, the distribution of the global seismic forces among the seismic-resistant elements and the criteria for the design of the individual elements for combined static and dynamic forces are the main topics to be discussed herein. The proposed methodology is illustrated. Some examples taken from the project practice are presented for illustration the exposed concepts

  18. Electrohydraulic system to control NPP turbines

    International Nuclear Information System (INIS)

    Kosyak, Yu.F.; Virchenko, M.A.; Rozhanskij, V.E.; Rokhlenko, V.Yu.; Gapunin, A.Ya.; Zhornitskaya, T.Ya.; Rasskazov, I.Eh.; Butsenko, V.N.; Brajnin, L.S.; Makarenko, N.I.

    1985-01-01

    Operation regimes of electrohydraulic regulation system (EHRS) of NPP turbines, designed to control the turbine in start-up and working conditions, have been decribed. In start-up regimes EHRS ensures the testing of control valves of the turbine, the turn of the turbine from zero to the nominal rotation frequency (automatic, semiautomatic and manual regulation), turbine acceleration to test safety automatic systems, gradual change in rotation frequency during generator synchronization with circuit. Under working conditions EHRS ensures the maintenance of frequency, power and vapour pressure before the turbine. A block diagram of EHRS is presented. Sensors and electronic part of EHRS are supplied with triple reservation, which ensures a high relaibility of the system

  19. Control system for NPP powerfull turbines

    International Nuclear Information System (INIS)

    Osipenko, V.D.; Rozhanskij, V.E.; Rokhlenko, V.Yu.

    1985-01-01

    A control system for NPP 1000 MW turbines safety is described. The turbine safety system has a hydraulic drive to actuate in case of increasipg of rotational speed of a turbine rotor and an electrohydraulic drce to operate in case of pressure reduction in the lubrication system, axial displacement deviation, etc. The system is highly reliable due to application of a safety system without slide valves and long-term operation of hydraulic controls in guarding conditions; the system epsures multifunctional control with high accuracy and speed due to application of the intricate electronic part, high speed of response with a limited use of high pressure oil due to application of two-pressure pumps, pneumohydraulic accumulators and oil discharge valves. Steady-state serviceability of the system is maintained by devices for valve cooling dawn. A shockless change from electrohydraulic to hydraulic control channels is provided

  20. NPP Cernavoda Unit 2 Financing Completion Works

    International Nuclear Information System (INIS)

    Chirica, T.; Stefanescu, A.; Constantin, C.; Dobrin, M.

    2002-01-01

    NPP Cernavoda Unit 2 completion is the highest priority of the Romanian power sector strategy. The nuclear energy represents, through its technological features of adopted solution (a CANDU nuclear power plant) and also through technological and economical performance indicators, the best solution to fulfill the demands concerning the sustainable development and the electricity request. The guidelines of energy strategy regarding the nuclear sector development in Romania are framing in the general policy for energy system development at least costs and they are responding to requests concerning the environment and people protection. The paper presents the financing alternatives for Unit 2 completion works taking into consideration the financing market conditions. The paper presents the impact of the financing conditions on the project efficiency, as well as the facilities offered by the Romanian Government in order to support this project. (author)

  1. Training change control process at Cernavoda NPP

    International Nuclear Information System (INIS)

    Valache, Cornelia Mariana

    2005-01-01

    The paper presents the process of 'Training Change Control' at Cernavoda NPP. This process is a systematic approach that allows determination of the most effective training and/or non-training solutions for challenges that may influence the content and conditions for a training program or course. Changes may be the result of: - response to station systems or equipment modifications; - new or revised procedures; - regulatory requirements; - external organizations requirements; - internal evaluations meaning feedback from trainees, trainers, management or post-training evaluations; - self-assessments; - station condition reports; - operating experience (OPEX); - modifications of job scope; - management input. The Training Change Control Process at Cernavoda NPP includes the following aspects. The first step is the identification of all the initiating factors for a potential training change. Then, retain only those, which could have an impact on training and classify them in two categories: as deficiencies or as enhancement suggestions. The process is different for the two categories. The deficiency category supposes the application of the Training Needs Analysis (TNA) process. This is a performance-oriented process, resulting in more competent employees, solving existing and potential performance problems. By using needs analysis to systematically determine what people or courses and programs are expected to do and gathering data to reveal what they are really doing, we can receive a clear picture of the problem and then we can establish corrective action plans to fix it. The process is supported by plant subjects matter and by training specialists. On the other hand, enhancements suggestions are assessed by designated experienced persons and then are implemented in the training process. Regarding these two types of initiating factors for the training change control process, the final result consists of a training improvement, raising the effectiveness, efficiency or

  2. Digital Components in Swedish NPP Power Systems

    International Nuclear Information System (INIS)

    Karlsson, Mattias; Eriksson, Tage

    2015-01-01

    Swedish nuclear power plants have over the last 20 years of operation modernised or exchanged several systems and components of the electrical power system. Within these works, new components based on digital technology have been employed in order to realize functionality that was previously achieved by using electro-mechanical or analogue technology. Components and systems such as relay protection, rectifiers, inverters, variable speed drives and diesel-generator sets are today equipped with digital components. Several of the systems and components fulfil functions with a safety-role in the NPP. Recently, however, a number of incidents have occurred which highlight deficiencies in the design or HMI of the equipment, which warrants questions whether there are generic problems with some applications of digital components that needs to be addressed. The use of digital components has presented cost effective solutions, or even the only available solution on the market enabling a modernisation. The vast majority of systems using digital components have been operating without problems and often contribute to improved safety but the challenge of non-detectable, or non-identifiable, failure modes remain. In this paper, the extent to which digital components are used in Swedish NPP power systems will be presented including a description of typical applications. Based on data from maintenance records and fault reports, as well as interviews with designers and maintenance personnel, the main areas where problems have been encountered and where possible risks have been identified will be described. The paper intends to investigate any 'tell-tales' that could give signals of unwanted behaviour. Furthermore, particular benefits experienced by using digital components will be highlighted. The paper will also discuss the safety relevance of these findings and suggest measures to improve safety in the application of digital components in power systems. (authors)

  3. Plant performance monitoring program at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Kavsek, D.

    2004-01-01

    A high level of nuclear safety and plant reliability results from the complex interaction of a good design, operational safety and human performance. This is the reason for establishing a set of operational plant safety performance indicators, to enable monitoring of both plant performance and progress. Performance indicators are also used for setting challenging targets and goals for improvement, to gain additional perspective on performance relative to other plants and to provide an indication of a potential need to adjust priorities and resources to achieve improved overall plant performance. A specific indicator trend over a certain period can provide an early warning to plant management to evaluate the causes behind the observed changes. In addition to monitoring the changes and trends, it is also necessary to compare the indicators with identified targets and goals to evaluate performance strengths and weaknesses. Plant Performance Monitoring Program at Krsko NPP defines and ensures consistent collection, processing, analysis and use of predefined relevant plant operational data, providing a quantitative indication of nuclear power plant performance. When the program was developed, the conceptual framework described in IAEA TECDOC-1141 Operational Safety Performance Indicators for Nuclear Power Plants was used as its basis in order to secure that a reasonable set of quantitative indications of operational safety performance would be established. Safe, conservative, cautious and reliable operation of the Krsko NPP is a common goal for all plant personnel. It is provided by continuous assurance of both health and safety of the public and employees according to the plant policy stated in program MD-1 Notranje usmeritve in cilji NEK, which is the top plant program. Establishing a program of monitoring and assessing operational plant safety performance indicators represents effective safety culture of plant personnel.(author)

  4. Indicators to monitor NPP operational safety performance

    International Nuclear Information System (INIS)

    Gomez-Cobo, Ana

    2002-01-01

    Since December 1995 the IAEA activities on safety performance indicators focused on the elaboration of a framework for the establishment of an operational safety performance indicator programme. The development of this framework began with the consideration of the concept of NPP operational safety performance and the identification of operational safety attributes. For each operational safety attribute, overall indicators, envisioned as providing an overall evaluation of relevant aspects of safety performance, were established. Associated with each overall indicator is a level of strategic indicators intended to provide a bridge from overall to specific indicators. Finally each strategic indicator was supported by a set of specific indicators, which represent quantifiable measures of performance. The programme development was enhanced by pilot plant studies, conducted over a 15 month period from January 1998 to March 1999. The result of all this work is compiled in the IAEA-TECDOC-1141, to be published shortly. This paper presents a summary of this IAEA TECDOC. It describes the operational safety performance indicator framework proposed and discusses the results of and lessons learned from the pilot studies. Despite the efforts described, it is clear that additional research is still necessary in areas such as plant-specific adaptation of proposed frameworks in order to suit individual data collection systems and plant characteristics, indicator selection, indicator definition, goal setting, action thresholds, analysis of trends, indicator display systems, analysis of overall safety performance (i.e., aggregation or combination of indicators), safety culture indicators, qualitative indicators, and use of additional indicators to address issues such as industrial safety attitude and performance, staff welfare, and environmental compliance. This is the rationale for a new IAEA Coordinated Research Project on 'Development and application of indicators to monitor NPP

  5. Detection of primary coolant leaks in NPP

    International Nuclear Information System (INIS)

    Slavov, S.; Bakalov, I.; Vassilev, H.

    2001-01-01

    The thermo-hydraulic analyses of the SG box behaviour of Kozloduy NPP units 3 and 4 in case of small primary circuit leaks and during normal operation of the existing ventilation systems in order to determine the detectable leakages from the primary circuit by analysing different parameters used for the purposes of 'Leak before break' concept, performed by ENPRO Consult Ltd. are presented. The following methods for leak detection: measurement of relative air humidity in SG box (can be used for detection of leaks with flow rate 3.78 l/min within one hour at ambient parameters - temperature 40 0 - 60 0 C and relative humidity form 30% to 60%); measurement of water level in SG box sumps (can not be used for reliable detection of small primary circuit leakages with flow rate about 3.78 l/min); measurement of gaseous radioactivity in SG box( can be used as a general global indication for detection of small leakages from the primary circuit); measurement of condensate flow after the air coolers of P-1 venting system (can be used for primary circuit leak detection) are considered. For determination of the confinement behaviour, a model used with computer code MELCOR has been developed by ENPRO Consult Ltd. A brief summary based on the capabilities of the different methods of leak detection, from the point of view of the applicability of a particular method is given. For both Units 3 and 4 of Kozloduy NPP a qualified complex system for small leak detection is planned to be constructed. Such a system has to unite the following systems: acoustic system for leak detection 'ALUS'; system for control of the tightness of the main primary circuit pipelines by monitoring the local humidity; system for primary circuit leakage detection by measuring condensate run-off in collecting tank after ventilation system P-1 air coolers

  6. Benchmarking HRA methods against different NPP simulator data

    International Nuclear Information System (INIS)

    Petkov, Gueorgui; Filipov, Kalin; Velev, Vladimir; Grigorov, Alexander; Popov, Dimiter; Lazarov, Lazar; Stoichev, Kosta

    2008-01-01

    The paper presents both international and Bulgarian experience in assessing HRA methods, underlying models approaches for their validation and verification by benchmarking HRA methods against different NPP simulator data. The organization, status, methodology and outlooks of the studies are described

  7. Summary of NPP personnel training in Czech Republic

    International Nuclear Information System (INIS)

    1996-01-01

    The preparation of NPP personnel is one of the most important phases of the process of construction, commissioning, operation and maintenance of nuclear power facilities. The objective is to improve personnel abilities so that they would be able to assure reliable, safe and economic operation of these facilities with high investment costs. It is the purpose of Nuclear Training Centre Brno (NTC Brno) to provide training and services which are responsive to the technological demands and emerging educational standards and criteria of the NPP and the nuclear industry. Fulfilling this purpose is a challenging task. The staff of NTC Brno, in a joint effort with NPP Dukovany and NPP Temelin, has responded to the challenge with comprehensive programs aimed at meeting customers needs. The programs are broadly based, yet flexible so that they can incorporate specific customer requirements

  8. Investigation of interfacing NPP simulators with PSCAD software

    International Nuclear Information System (INIS)

    Zahedi, P.

    2006-01-01

    This paper demonstrates a new method of interfacing a NPP simulator with the PSCAD software so that the interaction between the plant dynamics and the grid dynamics can be studied. Through this method, data extracted from NPP simulator, as an object, will be communicated to a server running PSCAD software. This paper will illustrate the use of Remote Procedure Calls (RPC) as a distributed, client-server based application used to establish a connection between NPP simulator running on UNIX server and PSCAD running on a PC. Using this method, the called procedure need not exist in the same address space as the calling procedure. Communication protocols available in the NPP simulator are used to export data from the simulator. (author)

  9. IPEEE Review of other external events of the NPP Asco

    International Nuclear Information System (INIS)

    Canadell, F.; Aleman, A.; Beltran, F.; Pifarre, D.; Hernandez, H.; Gasca, C.

    2011-01-01

    Within the process of maintaining and updating the risk analysis of the NPP Asco, results from the review of the vulnerability study of the plant against severe accidents caused by external success (Individual Plant Examination of External Events, IPEEE).

  10. Seismic re-evaluation process in Medzamor-2 NPP

    International Nuclear Information System (INIS)

    Zadoyan, P.

    2000-01-01

    Seismic re-evaluation process for Medzamor-2 NPP describes the following topics: program implementation status; re-evaluation program structure; regulatory procedure and review plan; current tasks and practice; and regulatory assessment and research programs

  11. Radiological impact on the surrounding area of Cernavoda NPP operation

    International Nuclear Information System (INIS)

    Busnita, M.; Penescu, M.; Neacsu, L.; Ion, M.; Moldoveanu, E.

    1996-01-01

    The objective of this paper is to present the protective measures provided to Cernavoda NPP for population and environment in case of normal operation and accidental situations. The paper describes the nuclear safety concept with the two aspects, the technical safety and the radiation protection, respectively, which represent the theoretical basis of the NPP design, construction and operation. The assessment of the potential radiological effects of Cernavoda NPP operation on the population and other environmental factors have been done by using the following input data: the natural and social characteristics of the site and the technical characteristics of the plant. The effects of Cernavoda NPP operation are also exposed in health risks which are compared with the daily risks of the population exposed of the natural phenomena or to the activities like transportation, domestics or industrial. (author). 1 tab., 6 refs

  12. Introduction of the SAT based training programs at Paks NPP

    International Nuclear Information System (INIS)

    Kiss, I.

    1998-01-01

    An introduction of the SAT based training programs at Paks nuclear power plant is described in detail, including framework of project operation; project implementation; process of SAT applied at Paks NPP and the needs of its introduction

  13. Preparation of Long Term Operation in Dukovany NPP, Czech Republic

    International Nuclear Information System (INIS)

    Krivanek, R.; Sabata, M.

    2012-01-01

    Dukovany NPP in the south-east of the Czech Republic operates four VVER 440/213 type units. The first unit was commissioned in 1985 and the last one in 1987. The operational results of the whole NPP have been excellent and NPP permanently belongs between the first quartile of the best operated NPPs in the world in accordance with WANO factors. Large safety improvement programme have been implemented in last 15 years. The original design lifetime of main components is 30 years which means till 2015 and it is understandable that NPP is preparing for long-term operation (LTO). The paper is describing activities carried out and planned for safe and successful LTO. (author)

  14. NPP Mochovce units 1 and 2 diagnostic systems

    International Nuclear Information System (INIS)

    Heidenreich, S.

    1997-01-01

    In this paper the diagnostic systems (leak detection monitoring, vibration monitoring, lose parts monitoring, fatigue monitoring) of NPP Mochovce units 1 and 2 are presented. All of the designed diagnostic systems are personal computer based systems

  15. HANPP Collection: Global Patterns in Net Primary Productivity (NPP)

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Patterns in Net Primary Productivity (NPP) portion of the Human Appropriation of Net Primary Productivity (HANPP) Collection maps the net amount of solar...

  16. HANPP Collection: Global Patterns in Net Primary Productivity (NPP)

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Patterns in Net Primary Productivity (NPP) portion of the HANPP Collection maps the net amount of solar energy converted to plant organic matter through...

  17. Computerized systems of NPP operators support. (Psychological problems)

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1995-01-01

    Operator psychological problems arising in the work with NPP operators support computerized systems (OSCS) are considered. The conclusion is made that the OSCS intellectual application will bring the operator into dangerous dependence on his computerized assistant. To avoid this danger it is necessary by creation of the OSCS to divide specially the tasks areas of the operator and OSCS in order to assure the active role of the operator in the NPP control

  18. Studying the sampling representativeness in the NPP ventilation ducts

    International Nuclear Information System (INIS)

    Sosnovskij, R.I.; Fedchenko, T.K.; Minin, S.A.

    2000-01-01

    Measurements of the gas and aerosol voluminous activity in the NPP ventilation ducts are an important source of information on the radiation contaminants ingress into the environmental medium. These measurements include sampling, samples transport and proper measurements. The work is devoted to calculation of metrological characteristics of the sampling systems for the NPP gas-aerosol releases by different parameters of these systems and ventilation ducts. The results obtained are intended for application by designing such systems and their metrological certification [ru

  19. The psychological background about human error and safety in NPP

    International Nuclear Information System (INIS)

    Zhang Li

    1992-01-01

    A human error is one of the factors which cause an accident in NPP. The in-situ psychological background plays an important role in inducing it. The author analyzes the structure of one's psychological background when one is at work, and gives a few examples of typical psychological background resulting in human errors. Finally it points out that the fundamental way to eliminate the unfavourable psychological background of safety production is to establish the safety culture in NPP along with its characteristics

  20. Quantitative analysis of psychological personality for NPP operators

    International Nuclear Information System (INIS)

    Gao Jia; Huang Xiangrui

    1998-01-01

    The author introduces the relevant personality quantitative psychological research work carried out by 'Prognoz' Laboratory and Taiwan, and presents the primary results of the research for Chinese Nuclear Power Plant (NPP) operator's psychological personality assessment, which based on the survey of MMPI, and presents the main contents for the personality quantitative psychological research in NPP of China. And emphasizes the need to carry out psychological selection and training in nuclear industry

  1. Framatome Contribution to Chinese NPP Development and Standardization

    International Nuclear Information System (INIS)

    Charbonneau, S.

    1996-01-01

    First discussions in 1978 between Framatome and Chinese authorities about the supply of an NPP were successfully concluded in 1986 by the signature of the supply contracts (nuclear islands, conventional islands, nuclear fuel assemblies, and project management assistance) for the Daya Bay NPP. Since then teams of engineers and technicians from Framatome and other French companies, and from relevant Chinese institutes and agencies have gotten to know each other better and have deepened their relationships

  2. Assessment of financial expenditure for Rivne NPP power units decommissioning

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Salij, L.M.

    2007-01-01

    The article covers some financial aspects of developing a decommissioning concept for Rivne NPP power units with reactor VVER-440 and VVER-1000. Possible methodological approaches to costs estimate have been analyzed. Preliminary results of cost estimation are presented for two decommissioning options: deferred and immediate dismantling. Principally possible options for accumulating assets have been analyzed to finance measures related to Rivne NPP decommissioning. A mathematical model has been proposed for creating decommissioning financial reserve

  3. The main trends of work on lifetime management of NPP

    International Nuclear Information System (INIS)

    Dragunov, Yu.; Kurakov, Yu.

    1995-01-01

    The major trends of works on NPP lifetime management are discussed: Co-ordinating and organizational activities; studying the degradation processes and residual life; elaboration and implementation of the measures to maintain/enhance safety level of NPPs operating within design life; development of control principals of advanced NPPs aging and safe life; creation and development of regulations in the field of NPP aging and life management. 7 figs

  4. Morbidity with temporary disability in Kozloduy NPP workers

    International Nuclear Information System (INIS)

    Dobreva, B.; Novkirishki, V.

    1993-01-01

    Changes with time in indicators of disease incidence with temporary disability in Kozloduy NPP personnel have been studied for the period 1974-1991. The data were compared with those for 'Sofia-Iztok' TPP. The causes contributing to formation of the indicators of frequency, severity, and average duration were examined. No temporary disability because of radiation exposure has been recorded. As a whole, less temporary disability has been found at NPP than at TPP. (author)

  5. Tritium monitoring at NPP and enviromental area under survey

    International Nuclear Information System (INIS)

    Nurislamov, I.R.; Kham'yanov, L.P.; Panichkin, V.F.

    1983-01-01

    Methods and devices for tritium monitoring at NPP with the WWER-type reactors and the environment are described. Aqueous solutions of inorganic and organic compounds, water vapours in the air of NPP rooms and the environment atmosphere, free and bound water in soils and vegetation were the objects for monitoring. Methods of tritium sampling from the atmosphere as well as determination of its content in samples are presented. Special attention is paid to sample enrichment with tritium

  6. Hydrodynamics and sediment transport at Muria Peninsula NPP Site

    International Nuclear Information System (INIS)

    Heni Susiati; Berni A Subki; Harman A

    2011-01-01

    Coastal along the coast of the Muria Peninsula, particularly the location of the Muria NPP site candidate is a dynamic region, the interaction between physical oceanographic factors such as currents, waves and tides in the coastal sediments cause abrasion or accretion. Interactions have resulted in coastal dynamics needs to be considered in siting NPP is essential in order to plan. Capacity of hydro-oceanographic data is essential in order to plan the development of the Muria NPP. The process of selecting a safe site for hydro-oceanographic aspects carried out according to IAEA safety standards on site selection. For the evaluation stage of hydro oceanographic potential site (site survey stage), the analysis is more focused on the tidal along the northern coast, bathymetry, potential water resources and hydrologic systems in the Muria NPP siting locations, Jepara. The method used is a secondary, confirmation of field data collection and interpretation of modeling results. The results showed that the preparation for the construction of NPP need to be evaluated further to coastal conditions with respect to the increase coastal erosion in the area of prospective NPP siting. (author)

  7. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  8. Public opinion concerning completion of Khmelnitsky-2 and Rovno-4 NPP's construction for compensation of Chernobyl NPP shut-down

    International Nuclear Information System (INIS)

    Litvins'kij, L.L.; Novos'olov, G.M.; Majstrenko, O.V.; Sazonov, G.V.; Gryin, L.

    2001-01-01

    Interrogation of representation from non-government organizations and private persons from 46 countries about their opinion on completion of two NPP's construction revealed many comments about environmental effects, safety and economic aspects. These comments are analyzed by specialists

  9. Role of PRA in new NPP projects

    International Nuclear Information System (INIS)

    Julin, A.; Sandberg, J.; Virolainen, R.

    2012-01-01

    In Finland, a plant specific, Level 1 and 2 Probabilistic Risk Analysis (PRA) is required as a prerequisite for issuing the construction license and operating license. The use of PRA in various applications and the main insights are presented. These applications include e.g. PRA support to the design of SSCs (Systems, Structures and Components), definition of pre-service and in-service inspection programs, evaluation of the safety classification of SSCs, development of procedures, training and in definition of risk informed technical specifications, periodic testing and on-line preventive maintenance programs. In addition, PRA shall be used to assess the adequacy and coverage of the phase and system commissioning programs. Also the potential risks related to commissioning tests during nuclear test phase, shall be assessed with the help of PRA. In OL3 project, risk informed approach has been applied on a large scale for the first time in the design, construction and commissioning of a new NPP unit. Pre-nuclear commissioning tests have started at OL3 site and the plant is foreseen to begin commercial operation in 2013. Decisions have been made to launch new NPP projects. Teollisuuden Voima Oyj (TVO) is planning to build a new unit (OL4) at Olkiluoto site and a new utility, Fennovoima, is planning to build one unit at one of two alternative green field sites in Northern parts of Finland. Insights from PRAs of operating NPPs have been used in the evaluation of possible new sites to ensure that the site specific concerns and environmental conditions are adequately taken into account in the design of SSCs. Although the seismic activity at the Olkiluoto site is low, a comprehensive seismic risk analysis is being conducted. Its results support the review of the deterministic seismic design. For new sites, a probabilistic seismic hazard analysis has been carried out for the determination of the design earthquake. Experiences from OL3 licensing have been utilized in the

  10. EPC projects for EPR Flamanville 3 NPP

    International Nuclear Information System (INIS)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B.

    2010-01-01

    IBERDROLA Ingenieria y Construccion is carrying out a handful of activities in the EPR Flamanville 3 -FA3 NPP- context since 2007 matching oriented to position the company in the emerging marketplace of new nuclear power plants Generation III+, whose expectation for the next years is highly promising. IBERDROLA Ingenieria y Construccion leads 5 EPC -Engineering, Procurement and Commissioning- projects for FA3 NPP from the Nuclear Island till Sea Water Pumping Station as follows: - Design, procurement. fabrication, installation and testing of 21 shell and tubes heat-exchangers for the nuclear island. 12 out of these 17 HXs are conventional and will be designed according to ASME BPV code Section VIII and have to comply with PED 97/23/CE and ESPN. The remaining 5 HXs are nuclear and will be designed according to ASME BPV code Section III and have also to comply with PED and ESPN. - Design, procurement, fabrication and assembly of 9 demineralizers for different plant systems. Three of these Important To Safety (IPS) equipments have been manufactured according with ASME VIII codes and six of them with EN 13445 code plus additional requirements to comply with PED and final client requirements for nuclear island. - Design, fabrication and installation of qualified travelling water screening filters. The equipments furnished will be two nuclear safety qualified filters and associated equipment (cleaning water system and control system). Additionally some auxiliary devices such as grids, automatic trash rakes and stop gates are included in the contract. - Engineering, procurement, fabrication, erection and commissioning for the condensate treatment plant. This system includes a demineralizer tank, 5 filters, reactive injection mixer, pneumatic and manual valves, piping and instrumentation and control systems. - Engineering, procurement erection and commissioning for the electro-chlorination plant to protect the IPS piping for Condensate Water System for FA3. This system

  11. EPC projects for EPR Flamanville 3 NPP

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B. [Nuclear Generation Department, Iberdrola Ingenieria y Construccion, Avda. Manoteras 20, 28050 Madrid (Spain)

    2010-07-01

    IBERDROLA Ingenieria y Construccion is carrying out a handful of activities in the EPR Flamanville 3 -FA3 NPP- context since 2007 matching oriented to position the company in the emerging marketplace of new nuclear power plants Generation III+, whose expectation for the next years is highly promising. IBERDROLA Ingenieria y Construccion leads 5 EPC -Engineering, Procurement and Commissioning- projects for FA3 NPP from the Nuclear Island till Sea Water Pumping Station as follows: - Design, procurement. fabrication, installation and testing of 21 shell and tubes heat-exchangers for the nuclear island. 12 out of these 17 HXs are conventional and will be designed according to ASME BPV code Section VIII and have to comply with PED 97/23/CE and ESPN. The remaining 5 HXs are nuclear and will be designed according to ASME BPV code Section III and have also to comply with PED and ESPN. - Design, procurement, fabrication and assembly of 9 demineralizers for different plant systems. Three of these Important To Safety (IPS) equipments have been manufactured according with ASME VIII codes and six of them with EN 13445 code plus additional requirements to comply with PED and final client requirements for nuclear island. - Design, fabrication and installation of qualified travelling water screening filters. The equipments furnished will be two nuclear safety qualified filters and associated equipment (cleaning water system and control system). Additionally some auxiliary devices such as grids, automatic trash rakes and stop gates are included in the contract. - Engineering, procurement, fabrication, erection and commissioning for the condensate treatment plant. This system includes a demineralizer tank, 5 filters, reactive injection mixer, pneumatic and manual valves, piping and instrumentation and control systems. - Engineering, procurement erection and commissioning for the electro-chlorination plant to protect the IPS piping for Condensate Water System for FA3. This system

  12. Barsebaeck NPP in Sweden - Decommissioning Project

    International Nuclear Information System (INIS)

    Hakan, Lorentz

    2009-01-01

    Barsebaeck 1 and 2, type BWR (Boiling Water Reactor) with a capacity of 615 MWe was closed down permanently on 30 November 1999 respective 31 May 2005 due to political decision. Both units together have been in Service operation (Care and maintenance) since 1 December 2006. Barsebaeck NPP will stay in Service operation until beginning of 2018 when Dismantling operation begins with the aim of a free-realized site in the beginning of 2025. That means that the remaining buildings, including equipment should be declared free-released or dismantled. It would then be up to the owner, E.ON Kaernkraft Sverige AB (EKS) to decide what is to be done with the site in the future. There was a re-organisation at Barsebaeck Kraft AB (BKAB) in 1 January 2007 and the company is organised in the following areas of function: site service operation, decommissioning planning, new business and BO replacement. The Organisation at BKAB has gone down from 450 during operation of Barsebaeck 1 and 2 to 50 employees (2009-01-01) involved in Service operation of both units. But still there are in total 250 persons placed at Barsebaeck NPP with different kinds of job assignments. A lot of activities have been carried out since 2000 and up to now for example: - All nuclear fuel has been transported away to interim storage at CLAB in Oskarshamn. - BKAB have built up contact nets and competence by taking part in different kinds of national and international organisations (SKB, IAEA, OECD/NEA TAG, WNA, ENISS, WANO, EPRI etc) commissions. - The Electrical and operational systems have been rebuilt for the actual demands and requirements for the Service operation. - The central control room is unattended since 17 December 2007 and the supervision of the Service operation is handled by a system of VDI (duty engineers) and LOP (alarm operators). - Full system decontamination on unit 1 and 2. Barsebaeck's approach today and for the future dismantling are: - Safer; - Faster; - Cost effective. BKAB

  13. Increasing of leak-tightness of hermetic zone and other important components in NPPs

    International Nuclear Information System (INIS)

    Murani, J.

    2001-01-01

    The performed by VUEZ resealing works in the hermetic compartments/containment of WWER 440 and WWER 1000 NPPs in Slovakia (Jaslovske Bohunice V-1 NPP, Jaslovske Bohunice V-2 NPP, Mochovce NPP), the Czech Republic (Dukovany NPP, Temelin NPP) and Hungary (Pask NPP) are presented. The leakage rate from hermetic compartments at individual NPP reactor units are shown.The VUEZ activities in field of resealing of weld joints in pools and tanks in the Jaslovske Bohunice V-1 NPP and innovation of the seal of reactor pit protective hood (kolpak) are described. The principle of operation and practical experience of the SMU-V system implemented in the Jaslovske Bohunice V-1 NPP (WWER 440 - V 230) for NPP primary circuit leakage monitoring are also given

  14. The safety of Ignalina NPP and ecological danger in public opinion of inhabitants of Daugavpils region

    International Nuclear Information System (INIS)

    Peipinia, O.

    1998-01-01

    Inquest of Daugavpils' region pointed to a big anxiety for ecological danger of Ignalina NPP by inhabitants and experts. Absolute majority of respondents (73-78% inhabitants and 68-82% experts) apprehend the NPP as very dangerous and dangerous. More than half of respondents apprehend the dangerous increased during last two-three years. It is because no one has a good reference about situation, because tragic al Chernobyl NPP burst was on. The anxiety increases if the respondent lives nearer of NPP. Inhabitants of Daugavpils and it's region wants the better reference about situation, about future of Ignalina NPP after 2010 year, about securities means in case of NPP burst. (author)

  15. Ukrainian Nuclear Society International Conference 'Modernization of the NPP with VVER reactor' (abstracts)

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1999-01-01

    Abstracts of the papers presented at International conference of the Ukrainian Nuclear Society 'Modernization of the NPP with VVER reactor'. The following problems are considered: improving the NPP's safety and reliability; reactor modernization, the lifetime prolongation; increasing of the reactor operating characteristics; methods of capacity factor increasing: refueling control, maintenance control; technical and economical aspects of NPP modernization; modernization of the automated control system of the fuel process at the NPP's; technical features and methods for the continued radiation and technology control at the NPP's; training, increasing the staff qualification and NPP modernization

  16. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  17. NPP lifetime philosophy: the transatlantic difference

    International Nuclear Information System (INIS)

    Mowry, Christofer

    1998-01-01

    Fundamental institutional and cultural differences in the transatlantic nuclear power industries, and in particular those between the Nordic countries and the United States, have driven divergent plant life management strategies -strategies resulting in distinctly different plant performance. Recognition of the linkage between three key components of overall Nuclear Power Plant (NPP) performance - yearly O and M costs, safety, and effective plant lifetime -is based on different institutional perspectives. In the Nordic countries, explicit recognition of this linkage has been historically translated into an integrated approach to plant performance. American NPPs, however, have been forced to focus primarily on near term O and M performance and regulatory mandated investment. While Nordic NPPs view capital investment in plant lifetime management and modernization as necessary to avoid declining plant performance and the cost of replacement power, American NPPs exhibit reluctance for such investments due to the difficulty of justifying the associated short-term costs. The diverging histories of two NPPs of the same vintage and design, one in Sweden and one in the United States, exemplify the potential ramifications of these approaches. The Swedish plant continues to operate with excellent performance indicators, while undertaking a comprehensive and long-term modernization program. The American facility is likely to be decommissioned due to unsustainable economic performance. (author)

  18. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  19. SAT for NPP personnel training in Spain

    International Nuclear Information System (INIS)

    Gonzalez, M.

    1995-01-01

    The SAT process objectives as applied to Spanish NPPs are: Perform JTA for selected job positions at the NPPs; develop the associated training plans; develop training support media; prepare training instructors as teachers and as task analysts; develop a SAT database. A lesson-learned from the task assessments conducted at Spanish NPPs is that the final task list should be obtained with full participation of workers so that they feel the final training plan has been developed taking into account their own opinion and experience. The breakdown of the tasks into its elements and the concordant job performance measure was presented. The process of determining knowledge and skills associated with the task elements and the structure and use of the taxonomy codes (for component, system, and academic skills and knowledge) was shown and explained. Based on the Spanish experience, the average time devoted to analyze a complete task is 5.33 person-hours per task. This data has permitted training and plant management to allocate the NPP human resources to support the analysis phase of SAT (which can be very time-consuming)

  20. Nuclear fuel utilization at the Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Boyadzhiev, Z [Kombinat Atomna Energetika, Kozloduj (Bulgaria); Kharalampieva, Ts; Pejchinov, Ts

    1996-12-31

    Data on core loading and operation conditions during past fuel cycles of the Units 1 to 6 at the Kozloduy NPP are presented. The Units 1 and 2 have reached average discharge fuel burn-up of 31 MW d/kg U, the Unit 3 - 34 MW d/kg U and the Unit 4 - 36.5 MW d/kg U. By use of dummies and low-leakage core loading patterns for WWER-440 cores an effective reduction in reactor pressure vessel irradiation is obtained. By increasing the enrichment level and improving the characteristics of the Units 3 and 4, a design fuel cycles duration has been reduced by 5-10% in number of assemblies. Core loading design has been modelled using computer codes SPPS-1, BIPR-7, ALBOM, PROROC. A 3-year fuel cycle utilizing 4.4% enriched fuel proved to be more efficient for WWER-1000 by 15% reduction in fuel cost compared to the 2-year cycle. Future developments include improvements of the in-core monitoring system and process on-line simulation based on more accurate computer codes. 7 refs., 6 figs., 10 tabs.

  1. Shutdown chemistry optimization at Maanshan NPP

    International Nuclear Information System (INIS)

    Sun Yuanlung; Chuang Benjamin; Su Kouhwa; Kao Jueiting

    2009-01-01

    At Maanshan PWRs, a significant piping radiation buildup caused by crud burst from fuel surface in the beginning of RFO used to be blamed as a contribution to high personal exposures during outage. Therefore, several modifications on shutdown chemistry procedures such as, early lithium removal, rapid boration, dissolved hydrogen removal, extended RCP operation, and maintaining maximum let down flow, have been consecutively conducted since no.1RFO-16, 2006. The important operational and chemical parameters of modified shutdown chemistry procedures adopted in no.2 RFO-17, 2008 and superiority in low reading (2 mSv/hr) from let down heat exchangers area radiation monitor over 11mSv/hr of no.1 RFO-16 at the same area will be addressed in this paper. At the end of no.2 RFO-17, low personal exposures of 765 man-mSv (TLD)verified the absence of crud burst during shutdown chemistry process and broke records of Maanshan NPP as well. Even with a new job on PZR pre-emptive dissimilar weld overlay which exhausting 17.37% of total 797 man-mSv(TLD) in the latest no.1 RFO-18, 659 man-mSv (TLD) made another record low in the history of Maanshan. (author)

  2. Training needs analysis at Cernavoda NPP - Romania

    International Nuclear Information System (INIS)

    Georgescu, L.M.

    2002-01-01

    The paper is mainly on training needs analysis applied at Cernavoda NPP and will outline the Cernavoda (CNPP) approach in establishing what kind of training is necessary for CNPP employees, from the moment they are hired until they become qualified. The training methodology adapted at CNPP is one which adheres to the principles of the Systematic Approach to Training (SAT). SAT adoption at CNPP provides a broad integrated approach emphasizing not only technical knowledge and skills but also human factors knowledge, skills and attitudes. The analysis of SAT at CNPP consists of a 'table-top' analysis of training and qualification requirements. This paper will illustrate how a 'table-top' analysis by Subject Matter Experts is organized, carried out and recorded, and which categories of staff have begun this table-top analysis at CNPP. It will also give an example how this analysis is done: how the tasks of each job are rated, which are the used criteria, and how to proceed with the incorporation of the tasks into initial and continuing training, as appropriate. (author)

  3. Intranet portal at the Krsko NPP, Slovenia

    International Nuclear Information System (INIS)

    2016-01-01

    The intranet portal (named IntraNEK) at Krsko NPP serves as a single entry point to access the internet and various plant applications and links. The front page consists of the standard internet search bar and links to various applications that can either reside within the technological computer network (TRM) or within the plant business computer network. Access to the TRM applications is read only. Some applications on the business computer network are open to all personnel who log on to the network while some applications are restricted and secured, and require additional login entries. A selected link will open in a new window. Documents will open with the appropriate software tool depending on the document file format. Some categories of documents are available in image form only (e.g. procedures, drawings etc.), while some are available in fully searchable PDF format (e.g. technical specifications, updated safety analysis reports (USARs) etc.). Plant departments (organizational units) have their own pages accessible from the front page. Their pages contain links to their own information resources or links to other resources and applications, tailored to the department needs. During recent years a number of web based applications have been developed that are connected also with a common Oracle database. Some are designed to serve for data entry and browsing while others serve for browsing only

  4. Economic aspects of Dukovany NPP fuel cycle

    International Nuclear Information System (INIS)

    Vesely, P.; Borovicka, M.

    2001-01-01

    The paper discusses some aspects of high burnup program implementation at Dukovany NPP and its influence on the fuel cycle costs. Dukovany internal fuel cycle is originally designed as a three years cycle of the Out-In-In fuel reloading patterns. These reloads are not only uneconomical but they additionally increased the radiation load of the reactor pressure vessel due to high neutron leakage typical for Out-In-In loading pattern. To avoid the high neutron leakage from the core a transition to 4-year fuel cycle is started in 1987. The neutron leakage from the core is sequentially decreased by insertion of older fuel assemblies at the core periphery. Other developments in fuel cycle are: 1) increasing of enrichment in control assemblies (3.6% of U-235); 2) improvement in fuel assembly design (reduce the assembly shroud thickness from 2.1 to 1.6 mm); 3) introduction of Zr spacer grid instead of stainless steel; 4) introduction of new type of assembly with profiled enrichment with average value of 3.82%. Due to increased reactivity of the new assemblies the transition to the partial 5-year fuel cycle is required. Typical fuel loading pattern for 3, 3.5, 4 and 5-year cycles are shown in the presented paper. An evaluation of fuel cost is also discussed by using comparative analysis of different fuel cycle options. The analysis shows that introduction of the high burnup program has decrease relative fuel cycle costs

  5. NPP Krsko simulator training for operations personnel

    International Nuclear Information System (INIS)

    Pribozic, F.; Krajnc, J.

    2000-01-01

    Acquisition of a full scope replica simulator represents an important achievement for Nuclear power Plant Krsko. Operating nuclear power plant systems is definitely a set of demanding and complex tasks. The most important element in the goal of assuring capabilities for handling such tasks is efficient training of operations personnel who manipulate controls in the main control room. Use of a simulator during the training process is essential and can not be substituted by other techniques. This article gives an overview of NPP Krsko licensed personnel training historical background, current experience and plans for future training activities. Reactor operator initial training lasts approximately two and a half years. Training is divided into several phases, consisting of theoretical and practical segments, including simulator training. In the past, simulator initial training and annual simulator retraining was contracted, thus operators were trained on non-specific full scope simulators. Use of our own plant specific simulator and associated infrastructure will have a significant effect on the operations personnel training process and, in addition, will also support secondary uses, with the common goal to improve safe and reliable plant operation. A regular annual retraining program has successfully started. Use of the plant specific simulator assures consistent training and good management oversight, enhances conformity of operational practices and supports optimization of operating procedures. (author)

  6. Structural analysis of NPP components and structures

    International Nuclear Information System (INIS)

    Saarenheimo, A.; Keinaenen, H.; Talja, H.

    1998-01-01

    Capabilities for effective structural integrity assessment have been created and extended in several important cases. In the paper presented applications deal with pressurised thermal shock loading, PTS, and severe dynamic loading cases of containment, reinforced concrete structures and piping components. Hydrogen combustion within the containment is considered in some severe accident scenarios. Can a steel containment withstand the postulated hydrogen detonation loads and still maintain its integrity? This is the topic of Chapter 2. The following Chapter 3 deals with a reinforced concrete floor subjected to jet impingement caused by a postulated rupture of a near-by high-energy pipe and Chapter 4 deals with dynamic loading resistance of the pipe lines under postulated pressure transients due to water hammer. The reliability of the structural integrity analysing methods and capabilities which have been developed for application in NPP component assessment, shall be evaluated and verified. The resources available within the RATU2 programme alone cannot allow performing of the large scale experiments needed for that purpose. Thus, the verification of the PTS analysis capabilities has been conducted by participation in international co-operative programmes. Participation to the European Network for Evaluating Steel Components (NESC) is the topic of a parallel paper in this symposium. The results obtained in two other international programmes are summarised in Chapters 5 and 6 of this paper, where PTS tests with a model vessel and benchmark assessment of a RPV nozzle integrity are described. (author)

  7. Instrumentation database specific to Trillo I NPP

    International Nuclear Information System (INIS)

    Pereira Pagan, M.B.; Saenz de Tejada, P.; Fernandez Alvarez, A.; Haya, J.

    1997-01-01

    The analysis of data on electronic instrumentation components in the Trillo I PSA has involved and extra effort, basically due to the particular characteristics of these equipment items. This analysis has different aspects depending on the type of information used: Components whose data have been obtained from generic information sources (with or without Bayesian processing). Components whose data have been obtained from specific German studies (TUV) Components whose data have been based directly on the historical experience of Trillo I NPP Components whose data have been based on miscellaneous generic and specific sources This information can also be classified into: Micro components formed by a single module ar card Micro components: formed by set of instrumentation elements It can be further subdivided according to the operating conditions of the components: Equipment whose operation depends on the functions they perform in a particular system (eg. reactor protection system instrumentation channels) Equipment whose operation is not associated with particular conditions (eg. modules for motor-operated equipment). (Author)

  8. Nuclear fuel utilization in Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Boyadzhiev, Z; Kharalampieva, Ts; Pejchinov, Ts [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1994-12-31

    An assessment of fuel utilization in Kozloduy NPP units 1-6 is made on the basis of operational data obtained for a total of 62 fuel cycles. Basic characteristics of core loading and operation conditions are given. SPPS-1 and BIPR-7 codes are used to calculate assembly-wise power distributions for different full power days of a given cycle and unit. The data are compared with the measured values of these quantities. The analysis performed shows that the core loading option chosen has led to efficient fuel utilization without violation of the nuclear safety criteria. For WWER-440 (Units 1 - 4) this is expressed in effective reduction of the reactor vessel irradiation, maintaining the design duration of the fuel cycles at a reduced number of assemblies by a factor 5 - 5-10%, utilizing fuel with higher enrichment and implementing the 4-year fuel cycle. For WWER-1000 the improvements lead to: adoption of the 3-year fuel cycle utilizing fuel with 4.4% initial enrichment, implementation of improved fuel with a new type of absorbers and more effective low-leakage core loading patterns. 10 tabs., 6 figs., 7 refs.

  9. Lessons learnt from Ignalina NPP decommissioning project

    International Nuclear Information System (INIS)

    NAISSE, Jean-Claude

    2007-01-01

    The Ignalina Nuclear Power Plant (INPP) is located in Lithuania, 130 km north of Vilnius, and consists of two 1500 MWe RBMK type units, commissioned respectively in December 1983 and August 1987. On the 1. of May 2004, the Republic of Lithuania became a member of the European Union. With the protocol on the Ignalina Nuclear Power in Lithuania which is annexed to the Accession Treaty, the Contracting Parties have agreed: - On Lithuanian side, to commit closure of unit 1 of INPP before 2005 and of Unit 2 by 31 December 2009; - On European Union side, to provide adequate additional Community assistance to the efforts of Lithuania to decommission INPP. The paper is divided in two parts. The first part describes how, starting from this agreement, the project was launched and organized, what is its present status and which activities are planned to reach the final ambitious objective of a green field. To give a global picture, the content of the different projects that were defined and the licensing process will also be presented. In the second part, the paper will focus on the lessons learnt. It will explain the difficulties encountered to define the decommissioning strategy, considering both immediate or differed dismantling options and why the first option was finally selected. The paper will mention other challenges and problems that the different actors of the project faced and how they were managed and solved. The paper will be written by representatives of the Ignalina NPP and of the Project Management Unit. (author)

  10. Current technological trends in development of NPP systems

    International Nuclear Information System (INIS)

    Florescu, Gheorghe; Panaitescu, Valeriu

    2010-01-01

    The recent nuclear research issues look for new technologies and continuous progress in finding different and efficient solutions for sustained and upraising energy demand. The trend of increasing energy consumption and occurring of new and large consumers, especially from Asian countries, imposes finding of new means for clean, large scale and sustained energy production. NPPs availability was continuously monitored and improved; at the same time the safety of the nuclear energy production was under surveillance. The present development of the new technologies, the discoveries of new materials and development of efficient technological processes offer the opportunities for their appropriate implementation and use in the NPP system configurations and functioning/operation. The new technologies and scientific discoveries, and also the international cooperation, offer the opportunities to mitigate the actual barriers in order to cumulate and use advanced energy production, to find new energy sources and to build improved, reliable and safe power plants. The monitoring systems, intelligent sensors and SSCs, nanotechnologies and new/intelligent materials constitute the main ways for improvement of the NPP systems configuration and processes. The paper presents: - The state of the art in the level of the currently applied technologies for nuclear power systems development; - The actual technological limits that need to be over passed for improving the NPP systems ; - The main systems that need improvement and reconfiguration for development of currently operating NPPs as well as raising the operation efficiency, availability and total safety; - The actual energy production issues; - The key arguments in sustaining the R and D new NPP systems development; - Future trends in NPP development; - The limitations in industrial processes knowledge and use. Appropriate R and D in the field of NPP systems have specific characteristics that were considered in paper completion

  11. A comparison of the Kozloduy NPP and Temelin NPP I and C projects

    International Nuclear Information System (INIS)

    Cook, B.M.

    2004-01-01

    Because Kozloduy NPP and Temelin NPP are both VVER 1000 plants of roughly the same vintage, they are very similar in design. However, from the viewpoint of their I and C modernization projects, there are significant differences between these plants. Some of these differences stem from the evolution of I and C technology over the relatively short period between the two projects. Other differences arise from the fact that the Kozloduy project is a phased upgrade of the I and C systems in an operating plant while the Temelin project was a 'one time' installation of the entire plant I and C system. This paper discusses these differences as well as trends in the nuclear I and C field that will shape the industry in the future. In addition to technology evolution, the comparative advantages or problems in phased upgrade versus 'one time' installations are discussed. Conclusions drawn provide insight for the planning of future I and C upgrades in VVERs and other types of nuclear power plants. (author)

  12. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  13. Spent fuel pool risk analysis for the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Hust' ak, S.; Jaros, M.; Kubicek, J. [UJV Rez, a.s., Husinec-Rez (Czech Republic)

    2013-07-01

    UJV Rez, a.s. maintains a Living Probabilistic Safety Assessment (Living PSA) program for Dukovany Nuclear Power Plant (NPP) in the Czech Republic. This project has been established as a framework for activities related to risk assessment and to support for risk-informed decision making at this plant. The most extensively used PSA application at Dukovany NPP is risk monitoring of instantaneous (point-in-time) risk during plant operation, especially for the purpose of configuration risk management during plant scheduled outages to avoid risk significant configurations. The scope of PSA for Dukovany NPP includes also determination of a risk contribution from spent fuel pool (SFP) operation to provide recommendations for the prevention and mitigation of SFP accidents and to be applicable for configuration risk management. This paper describes the analysis of internal initiating events (IEs) in PSA for Dukovany NPP, which can contribute to the risk from SFP operation. The analysis of those IEs was done more thoroughly in the PSA for Dukovany NPP in order to be used in instantaneous risk monitoring. (orig.)

  14. Technical innovations at NPP Dukovany - for safe and efficient operation

    International Nuclear Information System (INIS)

    Sabata, M.; Vasa, I.

    2000-01-01

    Inherent features of the NPP Dukovany design provide a significant confidence in its nuclear safety assurance; among these features should be emphasised the reactor core stability and its control and protection system capability to hold the reactor in safe state following scram or accident conditions. Nevertheless, NPP Dukovany was designed in the early seventies, and current requirements for nuclear safety assurance are more strict and/or specific as a result of the technical development and lessons learned from nuclear accidents. The paper compares the safety design base established at the time of NPP Dukovany project implementation and the current reference design base. The paper also presents procedures applied to implement technical and operational measures which are introduced to fulfil the current basic safety criteria. The scope of such measures applied at NPP Dukovany is compared with that of EU countries introduced for the same reason - to meet the updated safety related requirements. Examples of some innovations already implemented or under implementation give an idea how NPP Dukovany proceeds in reaching the goal of harmonising its safety with the requirements to be met before the Czech Republic becomes a member country of the European Union. (author)

  15. New appraisement of siting for a NPP on Mures river

    International Nuclear Information System (INIS)

    Traian Mauna

    2010-01-01

    The studies for a second NPP siting on inner Romanian rivers began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. The experience gained from Cernavoda NPP siting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the CANDU type NPP Cernavoda project to the new parameters of close water cooling circuit and of hard less or no rock foundation strata. The new sites conditions mean a lot of changes of CANDU license and a decrease the output power supplied to the national electric grid. The studies on the Mures river as alternative site of Olt river in Transylvania region began in 1986 and were stopped after 1990. This paper tries to reconsider shortly the old analysis focused on geological and geotechnical aspects and other local sites characteristics according to the last IAEA Safety Standards taking into account also the last types of NPP generations and the number of units. (author)

  16. Review of accident analyses performed at Mochovce NPP

    International Nuclear Information System (INIS)

    Siko, D.

    2000-01-01

    In this paper the review of accident analysis performed in NPP Mochovce V-1 is presented. The scope of these safety measures was defined and development in the T SSM for NPP Mochovce Nuclear Safety Improvements Report' issued in July 1995. The main objectives of these safety measures were the followings: (a) to establish the criteria for selection and classification of accidental events, as well as defining the list of initiating events to be analysed. Accident classification to the individual groups must be performed in accordance with RG 1.70 and IAEA recommendations 'Guidelines for Accidental Analysis of WWER NPP' (IAEA-EBR-WWER-01) to select boundary cases to be calculated from the scope of initiating events; (b ) to elaborate the accident analysis methodology that also includes acceptance criteria for their result evaluation, initial and boundary conditions, assumption related with the application of the single failure criteria, requirements on the analysis quality, used computer codes, as well as NPP models and input data for the accident analysis; (c) to perform the accident analysis for the Pre-operational Safety Report (POSAR); (d) to provide a synthetic report addressing the validity range of codes models and correlations, the assessment against relevant tests results, the evidence of the user qualification, the modernisation and nodding scheme for the plant and the justification of used computer codes. Analyses results showed that all acceptance criteria were met with satisfactory margin and design of the NPP Mochovce is accurate. (author)

  17. Feature extraction and sensor selection for NPP initiating event identification

    International Nuclear Information System (INIS)

    Lin, Ting-Han; Wu, Shun-Chi; Chen, Kuang-You; Chou, Hwai-Pwu

    2017-01-01

    Highlights: • A two-stage feature extraction scheme for NPP initiating event identification. • With stBP, interrelations among the sensors can be retained for identification. • With dSFS, sensors that are crucial for identification can be efficiently selected. • Efficacy of the scheme is illustrated with data from the Maanshan NPP simulator. - Abstract: Initiating event identification is essential in managing nuclear power plant (NPP) severe accidents. In this paper, a novel two-stage feature extraction scheme that incorporates the proposed sensor type-wise block projection (stBP) and deflatable sequential forward selection (dSFS) is used to elicit the discriminant information in the data obtained from various NPP sensors to facilitate event identification. With the stBP, the primal features can be extracted without eliminating the interrelations among the sensors of the same type. The extracted features are then subjected to a further dimensionality reduction by selecting the sensors that are most relevant to the events under consideration. This selection is not easy, and a combinatorial optimization technique is normally required. With the dSFS, an optimal sensor set can be found with less computational load. Moreover, its sensor deflation stage allows sensors in the preselected set to be iteratively refined to avoid being trapped into a local optimum. Results from detailed experiments containing data of 12 event categories and a total of 112 events generated with a Taiwan’s Maanshan NPP simulator are presented to illustrate the efficacy of the proposed scheme.

  18. External Events PSA for the Paks NPP

    International Nuclear Information System (INIS)

    Bareith, Attila; Karsa, Zoltan; Siklossy, Tamas; Vida, Zoltan

    2014-01-01

    Initially, probabilistic safety assessment of external events was limited to the analysis of earthquakes for the Paks Nuclear Power Plant in Hungary. The level 1 seismic PSA was completed in 2002 showing a significant contribution of seismic failures to core damage risk. Although other external events of natural origin had previously been screened out from detailed plant PSA mostly on the basis of event frequencies, a review of recent experience on extreme weather phenomena made during the periodic safety review of the plant led to the initiation of PSA for external events other than earthquakes in 2009. In the meantime, the accident of the Fukushima Dai-ichi Nuclear Power Plant confirmed further the importance of such an analysis. The external event PSA for the Paks plant followed the commonly known steps: selection and screening of external hazards, hazard assessment for screened-in external events, analysis of plant response and fragility, PSA model development, and risk quantification and interpretation of results. As a result of event selection and screening the following weather related external hazards were subject to detailed analysis: extreme wind, extreme rainfall (precipitation), extreme snow, extremely high and extremely low temperatures, lightning, frost and ice formation. The analysis proved to be a significant challenge due to scarcity of data, lack of knowledge, as well as limitations of existing PSA methodologies. This paper presents an overview of the external events PSA performed for the Paks NPP. Important methodological aspects are summarised. Key analysis findings and unresolved issues that need further elaboration are highlighted. Development of external events PSA for the Paks NPP was completed by the end of 2012. The analysis followed the commonly known steps: selection and screening of external hazards, hazard assessment for screened-in external events, analysis of plant response and fragility, PSA model development, and risk

  19. NPP Boreal Forest: Consistent Worldwide Site Estimates, 1965-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides estimates of above- and below-ground biomass, above- and below-ground NPP (ANPP and BNPP), and total NPP(TNPP) for selected North American and...

  20. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  1. NPP Krsko Severe Accident Management Guidelines Implementation

    International Nuclear Information System (INIS)

    Basic, I.; Krajnc, B.; Bilic-Zabric, T.; Spiler, J.

    2002-01-01

    Severe Accident Management is a framework to identify and implement the Emergency Response Capabilities that can be used to prevent or mitigate severe accidents and their consequences. The USA NRC has indicated that the development of a licensee plant specific accident management program will be required in order to close out the severe accident regulatory issue (Ref. SECY-88-147). Generic Letter 88-20 ties the Accident management Program to IPE for each plant. The SECY-89-012 defines those actions taken during the course of an accident by the plant operating and technical staff to: 1) prevent core damage, 2) terminate the progress of core damage if it begins and retain the core within the reactor vessel, 3) maintain containment integrity as long as possible, and 4) minimize offsite releases. The subject of this paper is to document the severe accident management activities, which resulted in a plant specific Severe Accident Management Guidelines implementation. They have been developed based on the Krsko IPE (Individual Plant Examination) insights, Generic WOG SAMGs (Westinghouse Owners Group Severe Accident Management Guidances) and plant specific documents developed within this effort. Among the required plant specific actions the following are the most important ones: Identification and documentation of those Krsko plant specific severe accident management features (which also resulted from the IPE investigations). The development of the Krsko plant specific background documents (Severe Accident Plant Specific Strategies and SAMG Setpoint Calculation). Also, paper discusses effort done in the areas of NPP Krsko SAMG review (internal and external ), validation on Krsko Full Scope Simulator (Severe Accident sequences are simulated by MAAP4 in real time) and world 1st IAEA Review of Accident Management Programmes (RAMP). (author)

  2. Achievements and challenges of Paks NPP

    International Nuclear Information System (INIS)

    Bajsz, J.; Katona, T.

    2002-01-01

    As the six year long safety upgrading program at Paks NPP is approaching its final stage this year, it is a good opportunity to draw the conclusion: what have been done and how have measures influenced the safety of the plant. In its first part the paper gives an overview of the program's main issues, assesses the results from the point of view of safety, reliability and cost effectiveness as well. In the second part a survey of future tasks follows: (1) Hungary is joining to the EU. The accession process so far has not revealed any major problems concerning nuclear safety which could be seen as obstacles toward the membership. However the plant should be ready to meet the increasing level of safety regulations. Further safety upgrading measures are planned, mostly in the field of severe accident management. (2) The electricity market liberalisation in Hungary will start in 2003 and being a EU member state, the full market opening will happen within a few years. The plant has to take into account the specificity of market functioning. The most important thing is to preserve the present cost advantage of nuclear electricity generation within the market conditions. The paper presents measures performed and planned to keep the unit generation cost competitive. (3) The first unit at Paks will mark its 20't'h anniversary this year. Lifetime management issues are at the centre of the engineering activities. The work already started to prepare the lifetime extension for 20 years. The program for the license renewal, which was elaborated jointly with the nuclear regulatory body will be described.(author)

  3. Vandellos 1 NPP decommissioning feedback experience

    International Nuclear Information System (INIS)

    Fernandez, Rodriguez A.

    2003-01-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  4. Integrated NPP life cycle management - Agency's approach

    International Nuclear Information System (INIS)

    Gueorguiev, B.

    2002-01-01

    administrative - managerial or/and social - political activities aimed at the achievement of an optimised long term save and reliable operation of the plant including its decommissioning. Optimisation of the plant operational life is the most economical option equivalent to providing additional generating capacity. In its turn optimisation of operational or service life means extension of the operational license to the extent possible having in mind that the plant performance continues to maintain its safety and competitiveness on the market. To meet these requirements the need for an integrated NPP life management approach is becoming more and more evident. The IAEA in response to the needs of the Member states is implementing several programmes including the project on engineering and management practices for optimisation of nuclear power plant service life including decommissioning. The Project scope includes different possible modes of IAEA operations for the purposes of information exchange and technology transfer. It means arrangements for technical, advisory and consultant group meetings, development of databases and guidance documents on proven practices, co-ordinated research projects, technical co-operation projects, expert services, training activities, co-operation with other International organizations and some others. A number of issues are under consideration. They include economic analysis and considerations related to decision on continued operation versus decommissioning, optimisation of operation/maintenance/In-service inspection regimes to facilitate life management programmes, aging management and mitigation measures with regard to control and instrumentation, primary and secondary circuit equipment integrity, assessment of structural materials, creation and development of supporting databases, preservation of knowledge including aspects of training and qualification of NPP personnel, work force aging, pre-shut down and decommissioning activities

  5. Vandellos 1 NPP decommissioning feedback experience

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Rodriguez A. [Empresa Nacional de Residuos Radioactivos, ENPRESA, Madrid (Spain)

    2003-07-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  6. To the problem of reliability standardization in computer-aided manufacturing at NPP units

    International Nuclear Information System (INIS)

    Yastrebenetskij, M.A.; Shvyryaev, Yu.V.; Spektor, L.I.; Nikonenko, I.V.

    1989-01-01

    The problems of reliability standardization in computer-aided manufacturing of NPP units considering the following approaches: computer-aided manufacturing of NPP units as a part of automated technological complex; computer-aided manufacturing of NPP units as multi-functional system, are analyzed. Selection of the composition of reliability indeces for computer-aided manufacturing of NPP units for each of the approaches considered is substantiated

  7. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  8. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  9. Validation of MCNP NPP Activation Simulations for Decommissioning Studies by Analysis of NPP Neutron Activation Foil Measurement Campaigns

    Directory of Open Access Journals (Sweden)

    Volmert Ben

    2016-01-01

    Full Text Available In this paper, an overview of the Swiss Nuclear Power Plant (NPP activation methodology is presented and the work towards its validation by in-situ NPP foil irradiation campaigns is outlined. Nuclear Research and consultancy Group (NRG in The Netherlands has been given the task of performing the corresponding neutron metrology. For this purpose, small Aluminium boxes containing a set of circular-shaped neutron activation foils have been prepared. After being irradiated for one complete reactor cycle, the sets have been successfully retrieved, followed by gamma-spectrometric measurements of the individual foils at NRG. Along with the individual activities of the foils, the reaction rates and thermal, intermediate and fast neutron fluence rates at the foil locations have been determined. These determinations include appropriate corrections for gamma self-absorption and neutron self-shielding as well as corresponding measurement uncertainties. The comparison of the NPP Monte Carlo calculations with the results of the foil measurements is done by using an individual generic MCNP model functioning as an interface and allowing the simulation of individual foil activation by predetermined neutron spectra. To summarize, the comparison between calculation and measurement serve as a sound validation of the Swiss NPP activation methodology by demonstrating a satisfying agreement between measurement and calculation. Finally, the validation offers a chance for further improvements of the existing NPP models by ensuing calibration and/or modelling optimizations for key components and structures.

  10. Core design methodology and software for Temelin NPP

    International Nuclear Information System (INIS)

    Havluj, F; Hejzlar, J.; Klouzal, J.; Stary, V.; Vocka, R.

    2011-01-01

    In the frame of the process of fuel vendor change at Temelin NPP in the Czech Republic, where, starting since 2010, TVEL TVSA-T fuel is loaded instead of Westinghouse VVANTAGE-6 fuel, new methodologies for core design and core reload safety evaluation have been developed. These documents are based on the methodologies delivered by TVEL within the fuel contract, and they were further adapted according to Temelin NPP operational needs and according to the current practice at NPP. Along with the methodology development the 3D core analysis code ANDREA, licensed for core reload safety evaluation in 2010, have been upgraded in order to optimize the safety evaluation process. New sequences of calculations were implemented in order to simplify the evaluation of different limiting parameters and output visualization tools were developed to make the verification process user friendly. Interfaces to the fuel performance code TRANSURANUS and sub-channel analysis code SUBCAL were developed as well. (authors)

  11. Ways of solving the problem of NPP evaporate concentrate storage

    International Nuclear Information System (INIS)

    Dmitriev, S.A.; Lifanov, F.A.; Savkin, A.E.; Lashchenov, S.M.

    2000-01-01

    The use of next engineering operations: isotope separation using oxidation, filtration and selective sorption methods, hardening and long term secondary radioactive waste disposal (cement compound from filtration stage and depleted sorbent on filters); concentration and preparation of dry salts from the radionuclide-free stillage residues were proposed for NPP waste reprocessing. The laboratory and pilot tests that demonstrated the possibility for purification of NPP stillage residues from radionuclides to the levels less than maximum permissible ones were conducted. The purified stillage residues are sent for the burial after drying. The calculations of material flows are treated by the example of the Kursk NPP stillage residue and the scheme of the waste retrieval is given [ru

  12. The local impacts of Borssele NPP closing down

    International Nuclear Information System (INIS)

    Mandos, J.L.

    2000-01-01

    The municipal council of Borsele considers that the use of nuclear energy is a question of national policy, but considers itself responsible for town and country planning, safety and employment. The two latter aspects are especially significant if plans for shutdown are concerned. Confidence in safety of the NPP in Borsele has increased in recent years due to transparent information policy of the power plant itself as well as the local government and most of the employees living in the area. If considering the circumstances under which the decision about the closure of NPP one could sees this is a purely political decision. The local government will continue the close cooperation with the National government and the Parliament in solving the problem of employment and social impact of NPP shutdown

  13. Main principles of the Chernobyl' NPP zone development

    International Nuclear Information System (INIS)

    Ignatenko, E.I.; Komarov, V.I.; Zverkov, V.V.; Proskuryakov, A.G.

    1989-01-01

    It is suggested to divide the Chernobyl' NPP zone into two parts, which are the alienation and evacuation (buffer) zones. The alienation zone includes the areas with greatest contamination around the Chernobyl' NPP. The population residence in this zone is forbidden. The watching method of working with short-time personnel residence is suggested to be used in this zone. The buffer zone is the territory out of the alienation zone boundaries including all settlements, from which the population is evacuated. Constant residence is permitted in the buffer zone for persons 50 and more years old with introduction of restrictions for diet and residence organization. The production activity in this zone includes operation of three units of the Chernobyl' NPP, works with the Ukrytie object and researches. Operations connected with radioactive waste processing and redisposal from places of storage is not recommended to be done. It is suggested to develop methods for local radioactive waste processing

  14. The Ignalina NPP and Y2K Problem

    International Nuclear Information System (INIS)

    Medeliene, D.

    2000-01-01

    Work on preparing the hardware and software of the Ignalina NPP for the year 2000 was started in December 1998. First of all, a Y2K project team was formed comprising 29 specialists. Some of these are the most experienced computer specialist, others co-ordinate work on the Y2K problem at the divisions of the NPP using computers or microprocessors. The project head was appointed and the schedule of work confirmed. In accordance with the schedule, the work was divided into twelve stages. The results showed that the preparations were adequate. On the New Year night the specialists of the Ignalina NPP Emergency Operation Centre worked together with the managers of the plant. Relation with other Lithuanian and international organisations was established. No any Y2K related event happened

  15. Computer Security of NPP Instrumentation and Control Systems: Cyber Threats

    International Nuclear Information System (INIS)

    Klevtsov, A.L.; Trubchaninov, S.A.

    2015-01-01

    The paper is devoted to cyber threats, as one of the aspects in computer security of instrumentation and control systems for nuclear power plants (NPP). The basic concepts, terms and definitions are shortly addressed. The paper presents a detailed analysis of potential cyber threats during the design and operation of NPP instrumentation and control systems. Eleven major types of threats are considered, including: the malicious software and hardware Trojans (in particular, in commercial-off-the-shelf software and hardware), computer attacks through data networks and intrusion of malicious software from an external storage media and portable devices. Particular attention is paid to the potential use of lower safety class software as a way of harmful effects (including the intrusion of malicious fragments of code) on higher safety class software. The examples of actual incidents at various nuclear facilities caused by intentional cyber attacks or unintentional computer errors during the operation of software of systems important to NPP safety.

  16. System for ecological monitoring and assessment for NPP site environment

    International Nuclear Information System (INIS)

    Vorob'ev, E.I.; Olejnikov, N.F.; Reznichenko, V.Yu.

    1987-01-01

    On the basis of the Leningrad NPP named after V.I. Lenin the development of a system for ecological monitoring and assessment (EMA) of the environment state and health of personnel and population has started in the EMA program framework. The program of ecological monitoring and assessment coordinates the works on the study of NPP effect on the nature and people, effect of separate factors and their combination, methods and models for the description of the effects, forecasting and evaluation, selection of the optimal protection strategies. Scientific foundations, structure and content of the EMA program are given to coordinate the works carried out according to the program with other works carried out in the country in this direction. The paper deals with the composition of monitoring parameters of the standard system of ecological monitoring of the environment for NPP

  17. The EC TACIS project 'Social impact of closing Chornobyl NPP' objectives, tasks and intended outcomes

    International Nuclear Information System (INIS)

    Schoen, A.

    2001-01-01

    Being part of the common activities of Slavutich and ChNPP, our EC TACIS project representatives already actively participated in the elaboration of the state programme aimed to ensure the social security of the ChNPP personnel and the population of Slavutich in the result of the final shut down of ChNPP

  18. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  19. NPP capital equipment life control facilities and tools

    International Nuclear Information System (INIS)

    Nekrasov, A.V.; Proskuryakov, K.N.

    2009-01-01

    Algorithms and simulation package for calculation of eigen modes of coolant pressure oscillations in equipment of primary coolant circuit of WWER-1000 NPP, tuned-circuit Q-factor of an oscillating contour of the coolant, fluctuation frequencies pass band and attenuation factors of were developed. Calculation results for cases of presence and absence of gaseous state radiolysis products in the coolant were obtained. Results analysis makes it possible to disclose operating conditions which result in raised vibrations, and to develop control response in NPP industrial control system for their prevention [ru

  20. NPP Temelin instrumentation and control system upgrade and verification

    International Nuclear Information System (INIS)

    Ubra, O.; Petrlik, J.

    1998-01-01

    Two units of Ver 1000 type of the Czech nuclear power plant Temelin, which are under construction are being upgraded with the latest instrumentation and control system delivered by WEC. To confirm that the functional design of the new Reactor Control and Limitation System, Turbine Control System and Plant Control System are in compliance with the Czech customer requirements and that these requirements are compatible with NPP Temelin upgraded technology, the verification of the control systems has been performed. The method of transient analysis has been applied. Some details of the NPP Temelin Reactor Control and Limitation System verification are presented.(author)

  1. NPP life management program - status report for Slovenia

    International Nuclear Information System (INIS)

    Glumac, B.

    1998-01-01

    Status report on NPP life management in Slovenia is dealing with possible life extension of NPP Krsko which comprises: replacement of steam generator; power upgrade; exchange of plant process computer; snubber reduction program, additional forced ventilation cooling system. Fuel improvements are predicted as well as the problems of storing spent fuel, low and intermediate waste if the plant is to operate through 2023 and possibly beyond that date. Related research activities are concerned with radiation damage, modelling of reactor core parameters by Monte Carlo calculations and PSA and severe accidents studies. Most of the activities are performed in cooperation with foreign organisations

  2. Experimental analysis of specification language impact on NPP software diversity

    International Nuclear Information System (INIS)

    Yoo, Chang Sik; Seong, Poong Hyun

    1998-01-01

    When redundancy and diversity is applied in NPP digital computer system, diversification of system software may be a critical point for the entire system dependability. As the means of enhancing software diversity, specification language diversity is suggested in this study. We set up a simple hypothesis for the specification language impact on common errors, and an experiment based on NPP protection system application was performed. Experiment result showed that this hypothesis could be justified and specification language diversity is effective in overcoming software common mode failure problem

  3. Problems of complex automation of process at a NPP

    International Nuclear Information System (INIS)

    Naumov, A.V.

    1981-01-01

    The importance of theoretical investigation in determining the level and quality of NPP automation is discussed. Achievements gained in this direction are briefly reviewed on the example of domestic NPPs. Two models of the problem solution on function distribution between the operator and technical means are outlined. The processes subjected to automation are enumerated. Development of the optimal methods of power automatic control of power units is one of the most important problems of NPP automation. Automation of discrete operations especially during the start-up, shut-down or in imergency situations becomes important [ru

  4. Start-up of NPP Krsko; Pokusno obratovanje NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Spiler, J; Aralica, J [Nuklearna elektrana Krsko, Krsko (Yugoslavia)

    1984-07-01

    The report describes a review of start-up program and its realisation. There are also described some more significant start-up results with their evaluation. The most significant operation criteria are compared between NPP Krsko and other similar plants in the world. The comparison shows that after the first contractors and operation personnel efforts have been accomplished, our first nuclear power plant is a safe and reliable source of electric power. At the end there are listed NPP Krsko start-up recommendations and experience. (author)

  5. Structure study and design of Qinshan NPP PCCV

    International Nuclear Information System (INIS)

    Xia Zufeng; Xu Yongzhi; Wang Tianzhen; Wu Jibiao

    1993-02-01

    The design process of Qinshan NPP (nuclear power plant) PCCV (prestressed concrete containment vessel) is summarized. The tendon test, structural description, design bases and analysis method are introduced. The arrangement for preventing concrete from cracking and design features of post-tensioning system and steel liner are presented. The results of model test and non-linear analysis for ultimate load in Qinshan NPP PCCV are also given. Through the integrity test of PCCV, it shows that the test values are in agreement with predicted values, the structure is excellent and the performance of leak tightness conforms to the safety requirements

  6. EOPs at NPP Temelin: Analytical support for EOPs verification

    International Nuclear Information System (INIS)

    Bica, M.

    1999-01-01

    The process of implementation of symptom-based emergency operating procedures (EOPs) started at the NPP Temelin in 1993. The process has the following phases: development of symptom-based EOPs; EOPs verification; EOPs validation; operating personnel training; EOPs control and experience feedback. The development of Temelin specific EOPs was based on technology and know-how transfer using the Emergency Response Guidelines Methodology developed by the Westinghouse Owner Group. In this lecture the implementation of symptom-based EOPs in the the NPP Temelin is described

  7. Corrosion strength monitoring of NPP component residual lifetime

    International Nuclear Information System (INIS)

    Denisov, V.G.; Belous, V.N.; Arzhaev, A.I.; Shuvalov, V.A.

    1994-01-01

    Importance of corrosion and fatigue monitoring; types of corrosion determine the NPP equipment life; why automated on-line corrosion and fatigue monitoring is preferable; major stages of lifetime monitoring system development; major groups of sensors for corrosion and strength monitoring system; high temperature on-line monitoring of water chemistry and corrosion; the RBMK-1000 NPP unit automatic water chemistry and corrosion monitoring scheme; examples of pitting, crevice and general corrosion forecast calculations on the basis of corrosion monitoring data; scheme of an experimental facility for water chemistry and corrosion monitoring sensor testing. 2 figs., 4 tabs

  8. Study on the risk-informed regulation of NPP

    International Nuclear Information System (INIS)

    Wang Chaogui

    2007-01-01

    The risk-informed regulation is a modern type of NPP safety management mode using both deterministic and probabilistic approaches. It is necessary to entirely and systematically study the associated regulations, standards and practices in order to promote the developments of risk-informed regulations in China. This paper introduces the risk-informed regulation, gives out the basic principles, method and acceptance risk criteria of risk-informed decision,making, discusses the PSA requirements for risk-informed decision-making and makes some suggestions about the application of risk-informed regulations in Chinese NPP. (authors)

  9. Disposal of the radioactive contaminated soils from the NPP site

    International Nuclear Information System (INIS)

    Matusek, I.; Plsko, J.; Sajtlava, M.; Hulla, J.; Kovacs, T.

    2004-01-01

    Disposal of contaminated soils at site of NPP is one of the most important task within the frame of research and development tasks of the NPP decommissioning. The works within this field can be seen in several areas. Considered soil activity monitoring, observation of its geo-technical and geo-chemical parameters, volume balance, research of the radio nuclides behaviour in the soil and simulation of their influence on the surrounding environment with special emphasis on underground water, project studies and construction of the disposal facility for contaminated soils. This work presents overview of gained results in the mentioned areas of the research and development. (author)

  10. The evolution of the fuel cycle in the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Bajgl, J [Jaderna Elektrarna, Dukovany (Czech Republic)

    1994-12-31

    The ten-year operational experience of four WWER-440 units in Dukovany NPP with a total number of 35 cycles is outlined. The strategy of fuel reloading has been changed from out-in schemes to low-leakage patterns. The linear pin power limitation will be introduced. The main physical limits and conditions for the NPP operation are listed. The main goal is to go to a full 4-year fuel cycle in which the burnup will be about 40 Mwd/kg U. 6 tabs.

  11. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  12. Cernavoda NPP: Training for safety and reliability

    International Nuclear Information System (INIS)

    Postolache, Laura Lia

    2001-01-01

    The safe and reliable operation of NPP require successful integration of plant and system design (1), programmes and procedures (2) and qualified human resources (3). Of these three components, station personnel and management have capability to influence and improve programmes and competence of qualified personnel. Qualifying personnel includes selection, training and evaluation that meet the established performance standards. Training, therefore prepares people to achieve such competence. The critical role of operations personnel has been rightly emphasized by every country with a nuclear power programme. So far as operation team is concerned, they have to work, on the one hand with exacting safety rules and at the same time, they have to do the right thing at all times. In essence, they have to be prepared for new, emergency situations as well as for routine work. The plant operation in the Control Room is essentially a man - machine interaction and a safe and reliable operation requires them to take high quality decisions even under stressful conditions. Here lies therefore the need for high competent and licensed operations engineers who will ensure operation within the operating license of the station under the all conditions. The development of a long-term comprehensive training for Operation Staff is a requirement. The program addresses the qualification requirements of the various nuclear positions on shift, the outline content of the required training programs and the evaluation per the Systematic Approach to Training (SAT). A nuclear operator's training begins the moment he/she enters the station. It takes four to six years to develop the skills required to demonstrate that the candidate is an appropriate choice for the position. Then there's a further about two years of intense training at the Training Center on a simulator. After successful completion of the program, the candidate is authorized by the CNCAN (National Commission for Control of Nuclear

  13. Flaw detection of welded joints in NPP equipment assembly

    International Nuclear Information System (INIS)

    Kesler, N.A.; Polevik, V.A.; Orlov, N.S.

    1984-01-01

    State of the art and prospects of development of ultrasonic and radiography testing of welded joints for quality used in NPP equipment assembly are considered. Recommendations are given on reducing the labour content with the use of these methods. Specifications for the developed facilities intended for automation and mechanization of the described quality control methods are presented

  14. Welding of large-size embelled fittings in NPP construction

    International Nuclear Information System (INIS)

    Semenov, N.A.; Savinov, O.A.

    1988-01-01

    Drawbacks of the accepted technology for peoducing embedded fittings are considered. Activities on modernization of the standard ADF-2001 automatic welding machine are described. Results of testing the samples of welded joints performed using the modernized automatic welding machine, and economic effect caused by its introduction at the balakovo NPP second unit construction are presented

  15. Radiation protection in decommissioning of the NPP V1

    International Nuclear Information System (INIS)

    Svitek, J.; Kaizer, J.; Siska, J.

    2014-01-01

    What's new in decommissioning of the NPP V1? In 2014 the first stage of the decommissioning should be finished. The program of the first stage was characterized by decommissioning of the non-contaminated facilities and buildings (facilities and buildings out of the control area). However, during the first stage, two key activities were done during which radiation protection had to be especially supervised: BIDSF project - Treatment and Conditioning of Wet Historical Waste - Sludge and Sorbents in the operational tanks NPP V1 (the treatment has been the condition of the regulatory body for the ending of the first stage) and preparation of decontamination of both primary circuits NPP (without reactors). In the year 2015, the second stage of decommissioning should be started. Program for the second stage is broad and it includes fragmentation and treatment of activated parts of the primary circuits (reactors, their internal parts, shielding cassettes). Modification of the radiation protection equipment on the NPP site has been made by BIDSF projects. During the first stage, two basic projects have been done: C12 - Refurbishment of the radiation protection monitoring equipment and C-10 - Free release of decommissioning materials. The present state of monitoring systems, as the result of the aforementioned projects, and the first experiences are main part of this presentation. Another activity, which prepared basic conditions for an execution of radiation protection in the second stage of decommissioning, was the preparation of documents for the procurement of license for the second stage of decommissioning. (authors)

  16. Some aspects of RPV integrity of Ukrainian NPP's

    International Nuclear Information System (INIS)

    Zaritsky, N.; Kovyrshin, V.; Zhukov, P.

    1998-01-01

    The operating organisations in Ukraine implement the main IAEA recommendations concerned with NPP operational safety. Sufficient substantiation of the measures for improvement of WWER-1000 NPPs safety and reliability is provided. General information (chemical compositions and mechanical properties of reactor pressure vessel materials) is already collected on all Ukrainian WWER-1000 NPPs and transferred to International database on Pressure Vessel materials

  17. The post-accidents exploitation of Chernobyl NPP

    International Nuclear Information System (INIS)

    Nosovskij, A.V.

    1996-01-01

    Problems facing the Chernobyl NPP personnel since its commissioning and during its post-accident operation are considered. The accomplished measures on improving the power units safety, normalization of the radiation situation as well as the impact of psychological factor at the safety culture level are discussed

  18. Analysis of flooding possibilities of premises of Ignalina NPP

    International Nuclear Information System (INIS)

    1999-01-01

    Analysis of flooding possibilities of premises with safety related equipment of Ignalina NPP was performed. In calculations codes SQUIRT and RELAP5 was used. In most cases it was found that it would be enough time to take corrective measure in the case of flooding accident

  19. The Chernobyl NPP decommissioning: Current status and alternatives

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Steinberg, N.

    1996-01-01

    After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations

  20. Low level radioactive waste disposal in Kozloduy NPP in Bulgaria

    International Nuclear Information System (INIS)

    Stanchev, V.

    2001-01-01

    Kozloduy NPP is the biggest power plant in the Republic of Bulgaria. It is in operation since 1974 and for the past 25 years it has generated over 263 billion kWh electric power. The NPP share in the total electric production in 1998 was about 50%. It has six units in operation - four WWER 440 B-230 and two WWER 1000 B-320. In the nuclear reactor operation the generation of radioactive waste (RAW) is an inevitable process. The waste must be conditioned, stored and disposed of in a safe manner. There are no national radioactive waste disposal facilities, for waste generated by an NPP, in Bulgaria to the moment. This situation necessitates the storage of operational RAW to be carried out on site for a long period of time (30 to 50 years). Following the principle for protection of human health and environment now and in the future, Kozloduy NPP adopted the concept for conditioning the RAW to a stable solid form and placing the waste in a package which should keep its features for a sufficiently long term so that the package can be safely transported to the disposal site. (author)

  1. Device to measure level in a steam drum of NPP

    International Nuclear Information System (INIS)

    Vinogradov, Yu.A.

    1988-01-01

    Gravitation-hydrostatic device for measuring coolant level in a steam drum of NPP is described. The device enables to improve the accuracy and sensitivity of measuring coolant level above and below the submerged perforated sheet of the steam drum and decrease the amount of levelling vessels in the unit by 50%. 1 fig

  2. Heat resistance insulation for NPP pipelines and components

    International Nuclear Information System (INIS)

    Yurchenko, V.G.; Nazarova, G.A.; Popov, A.M.; Matveeva, N.F.

    1986-01-01

    To insulate hot surfaces of NPP process equipment and pipes it is suggested to use heat resistant insulation of foam aminoimides (FAI). Relative toxicity of aceton and acetaldehyd evolved from FAI in the process of thermal and thermal-oxidative break-down was determined. FAI can be used at 200 deg C

  3. NPP safety and personnel training. XII International conference. Abstracts

    International Nuclear Information System (INIS)

    2011-01-01

    The 12th International conference NPP Safety and Personnel Training took place in Obninsk, October 4-7, 2011. The issues of nuclear technologies safety are considered.The problems of life-cycle management of nuclear facilities are discussed. The criteria of assessment of physical protection systems of nuclear facilities are presented [ru

  4. Regulatory review of NPP Krsko Periodic Safety Review

    International Nuclear Information System (INIS)

    Lovincic, D.; Muehleisen, A.; Persic, A.

    2004-01-01

    At the request of the Slovenian Nuclear Safety Administration (SNSA), Krsko NPP prepared a Periodic Safety Review (PSR) program in January 2001. This is the first PSR of NPP Krsko, the only nuclear power plant in Slovenia. The program was reviewed by the IAEA mission in May 2001 and approved by SNSA in July 2001. The program is made in accordance with the IAEA Safety Guide 'Periodic Safety Review of Operational Nuclear Power Plants' No. 50-SG-012 and with European practice. It contains a systematic review of operation of the NPP Krsko, including the review of the changes as a result of the modernization of the facility. The main tasks of PSR are review of plant status for each safety factor, development of aging and life cycle management program, review of seismic design and PSHA analysis and update of regulatory compliance program. The prioritization process of findings and action plan are also important tasks of PSR. The basic safety factors of the PSR review are: Operational Experience, Safety Assessment and Analyses, Equipment Qualification and Ageing Management, Safety Culture, Emergency Planing, Environmental Impact and Radioactive Waste, Compliance with license requirements and Prioritization. It had been agreed that SNSA will have reviewed all PSR reports generated during the PSR process. At the end of 2003 the PSR Summary Report with selected recommendations for action plan was completed and delivered to SNSA for review. The paper presents regulatory review of NPP Krsko PSR with emphasis on the evaluation of the PSR issues ranking process. (author)

  5. Cuba: Juragua NPP. Upgrades. Modifications and improvements. Annex 5A

    International Nuclear Information System (INIS)

    Gonzales Aguilera, H.

    1999-01-01

    This annex deals with upgrades - modifications and improvements. Planning for resumption of work at Juragua NPP is under way, and a strategic plan of upgrades and modifications has been prepared. The proposed improvements were categorized, reviewed by the regulatory body and generally approved. This annex outlines the format of the plan. (author)

  6. Survey of public participation potential regarding the Muria NPP program

    International Nuclear Information System (INIS)

    Yarianto-SBS; Sri Hariani Syarif; Heni Susiati; Imam Hamzah; Fepriadi

    2003-01-01

    Socio-culture aspect is a part of site feasibility evaluation of Nuclear Power Plant (NPP)program. Indonesia is under going democratization, therefore the paradigm of development has also been changed where the people have freedom or liberty and they can express their opinion independently. The people are significant factor that involving in the decision making of regional development.Even the socio-culture, such as social riot can reject the site. Therefore socio-culture aspect should be considered in the NPP site evaluation. The first step of the study,mapping of public participation potential should be conducted by field survey. The method used in there search is quantitative approach with field survey guided by questioner without any treatment of object sampled. Qualitative approach was also conducted by in-depth interview technique to collect more detailed information. Information were collected from general public without any stratification in the 10 km radius from NPP site. Sampling method used was full random sampling technique. The results of survey show that the most of the people have significant potential for participating in the NPP Program. Conducive atmosphere should be maintained by social setting, therefore the present good momentum will not be lost. (author)

  7. In-core fuel management for Cofrentes NPP

    International Nuclear Information System (INIS)

    Marco, M.

    1990-01-01

    Hidroelectrica Espanola has established an in-house nuclear analysis capability in Hidrola's Servicio de Ingenieria y Analisis Nucleares (SIAN). This article describes SIAN, its origins, resources, codes, and its work related to the company's 100%-owned Cofrentes NPP. 1 fig., 2 tabs

  8. Selection of suitable sites for NPP in Slovenia (stage 3)

    International Nuclear Information System (INIS)

    Grgic, M.; Fabjan, L.; Premru, U.

    1977-01-01

    Selection of suitable sites for nuclear power plants in Slovenia is considered. This includes the studies of available data on regional and local characteristics specified in general site suitability criteria for NPP. The most suitable selected sites will be included into land use urbanistic planning of Slovenia

  9. UA criterion for NPP safety estimation SALP program

    International Nuclear Information System (INIS)

    Gorynina, L.V.; Tishchenko, V.A.

    1992-01-01

    Adopted by NRC program SALR is considered. The program is intended for acquisition and estimation of data on the activities of forms having licences for NPP operation and (or) construction. The criteria for estimation and the mechanism for determination of the rating of the firm activity quality are discussed

  10. Improvement of waste release control in French NPP

    International Nuclear Information System (INIS)

    Samson, T.; Lucquin, E.; Dupin, M.; Florence, D.; Grisot, M.

    2002-01-01

    The new waste release control in French NPP is more restrictive than the old one and needs heavy investment to bring plants to compliance with it. The great evolutions are a chemical follow up on more chemicals with a higher measurement frequency and with lower maximum concentrations and a specific measurement of carbon 14. Regarding radioactive releases, a new counting has been settled and activity of carbon 14 release is now measured and no longer calculated. The evolution of the French regulation leads to develop specific procedures and analytical techniques in chemistry and in radiochemistry (UV spectrometric methods, carbon 14 measurements,..) EDF NPP operators have launched a voluntarist process to reduce their releases since the beginning and before the evolution of the regulation. EDF priorities in terms of environment care lead henceforth to implement a global optimisation of the impact for a better control of releases. The new regulation will help EDF to reach its goals because it covers all the aspects in one administrative document: it is seen as a real simplification and a clarification towards public. In addition, this new regulation fits in with international practices which will allow an easier comparison of results between EDF and foreign NPP. These big environmental concerns lead EDF to create a national dedicated laboratory (LAMEN) in charge of developing specific measurement procedures to be implemented either by NPP or by sub-contractor laboratories. (authors)

  11. Improving in organization of in-site planning for NPP

    International Nuclear Information System (INIS)

    Gitel'man, L.D.; Khanin, V.V.; Trunov, V.M.; Khanin, R.V.

    1986-01-01

    The organization of NPP section activity planning is considered. With regard to the structure of in-site plans by time and content, their distribution in organization control structure, order of plan development, stimulation, accounting and estimation of plan fulfillment, plan indices for each shop and plan-assignment form are developed

  12. Nuclear Power Plant Module, NPP-1: Nuclear Power Cost Analysis.

    Science.gov (United States)

    Whitelaw, Robert L.

    The purpose of the Nuclear Power Plant Modules, NPP-1, is to determine the total cost of electricity from a nuclear power plant in terms of all the components contributing to cost. The plan of analysis is in five parts: (1) general formulation of the cost equation; (2) capital cost and fixed charges thereon; (3) operational cost for labor,…

  13. Ecological radiation monotoring in NPP region, aims and tasks

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1986-01-01

    Aims and tasks of ecological radiation monitoring in the NPP region are discussed. The aims of monitoring are: to determine possible sequences of NPP radioactive release effects on ecosystems, taking place on the background of chemical and thermal pollution to develop standard of radiation effect on ecosystems; the aims includes also obtaining of information for forecasting and evaluating long-term radiation effects, establishment of factors characterizing the ecosystem state, establishment of a combined effect of radioactive wastes with chemical and thermal ones. Finally, the aim of monitoring consists in providing the natural object conservation in the NPP region under optimal operation conditions. Thus it is necessary to solve the following problems: to observe systematically release, transport and transformation, when transporting radioactive and chemical contaminants in terrestial and aquatic biocenoses, as well as injection and transport in them of waste heat; to observe systematically the natural physico-chemical, chemico-biological processes affecting the injection and transport of contaminants in ecosystem components; to observe systematically the natural and, probably, antropogenic processes; to carry out systematically observations of the ecosystem state in the NPP region and eco-systems-monitors

  14. Prospects of increasing the engineering level of NPP components

    International Nuclear Information System (INIS)

    Filippov, G.A.

    1987-01-01

    Consideration is being given to main problems related to development and industrial introduction of NPP components corresponding to the perspective world-wide engineering level. The nearest task in this field is to elevate the engineering level of developed and being produced power equipment up to the level of similar equipment, manufactured by leading foreign companies

  15. Operator reliability analysis during NPP small break LOCA

    International Nuclear Information System (INIS)

    Zhang Jiong; Chen Shenglin

    1990-01-01

    To assess the human factor characteristic of a NPP main control room (MCR) design, the MCR operator reliability during a small break LOCA is analyzed, and some approaches for improving the MCR operator reliability are proposed based on the analyzing results

  16. Evaluation of MODIS NPP and GPP products across multiple biomes.

    Science.gov (United States)

    David P. Turner; William D. Ritts; Warren B. Cohen; Stith T. Gower; Steve W. Running; Maosheng Zhao; Marcos H. Costa; Al A. Kirschbaum; Jay M. Ham; Scott R. Saleska; Douglas E. Ahl

    2006-01-01

    Estimates of daily gross primary production (GPP) and annual net primary production (NPP) at the 1 km spatial resolution are now produced operationally for the global terrestrial surface using imagery from the MODIS (Moderate Resolution Imaging Spectroradiometer) sensor. Ecosystem-level measurements of GPP at eddy covariance flux towers and plot-level measurements of...

  17. Nonlinear modal analysis in NPP dynamics: a proposal

    International Nuclear Information System (INIS)

    Suarez Antola, R.

    2005-07-01

    We propose and briefly suggest how to apply the analytical tools of nonlinear modal analysis (NMA) to problems of nuclear reactor kinetics, NPP dynamics, and NPP instrumentation and control. The proposed method is closely related with recent approaches by modal analysis using the reactivity matrix with feedbacks to couple neutron kinetics with thermal hydraulics in the reactors core. A nonlinear system of ordinary differential equations for mode amplitudes is obtained, projecting the dynamic equations of a model of NPP onto the eigenfunctions of a suitable adjoint operator. A steady state solution of the equations is taken as a reference, and the behaviour of transient solutions in some neighbourhood of the steady state solution is studied by an extension of Liapunov's First Method that enables to cope directly with the non-linear terms in the dynamics. In NPP dynamics these differential equations for the mode amplitudes are of polynomial type of low degree A few dominant modes can usually be identified. These mode amplitudes evolve almost independently of the other modes, more slowly and tending to slave the other mode amplitudes. Using asymptotic methods, it is possible to calculate a closed form analytical approximation to the response to finite amplitude perturbations from the given steady spatial pattern (the origin of the space of mode amplitudes).When there is finite amplitude instability, the method allows us to calculate the threshold amplitude as a well defined function of system's parameters. This is a most significant accomplishment that the other methods cannot afford

  18. Disposal of spent nuclear fuel from NPP Krsko

    International Nuclear Information System (INIS)

    Mele, I.

    2004-01-01

    In order to get a clear view of the future liabilities of Slovenia and Croatia regarding the long term management of radioactive waste and spent nuclear fuel produced by the NPP Krsko, an estimation of disposal cost for low and intermediate level waste (LILW) as well as for spent nuclear fuel is needed. This cost estimation represents the basis for defining the target value for the financial resources to be accrued by the two national decommissioning and waste disposal funds, as determined in the agreement between Slovenia and Croatia on the ownership and exploitation of the NPP Krsko from March 2003, and for specifying their financial strategies. The one and only record of the NPP Krsko spent fuel disposal costs was made in the NPP Krsko Decommissioning Plan from 1996 [1]. As a result of incomplete input data, the above SF disposal cost estimate does not incorporate all cost elements. A new cost estimation was required in the process of preparation of the Joint Decommissioning and Waste Management Programme according to the provisions of the above mentioned agreement between Slovenia and Croatia. The basic presumptions and reference scenario for the disposal of spent nuclear fuel on which the cost estimation is based, as well as the applied methodology and results of cost estimation, are presented in this paper. Alternatives to the reference scenario and open questions which need to be resolved before the relevant final decision is taken, are also briefly discussed. (author)

  19. NPP Krsko core calculations to improve operational safety

    International Nuclear Information System (INIS)

    Ivekovic, I.; Grgic, D.; Nemec, T.

    2007-01-01

    Calculation tools and methodology used to perform independent calculations of cumulative influence of different changes related to fuel and core operation of NPP Krsko were described. Some examples of steady state and transient results are used to illustrate potential improvements to understanding and reviewing plant safety. (author)

  20. Automated system for management of cementation line at Kursk NPP

    International Nuclear Information System (INIS)

    Petukhov, K.S.; Troshchenko, V.G.; Osintsev, V.V.; Molotkov, V.P.

    2005-01-01

    At Kursk NPP technological scheme of radioactive wastes tempering by dry cement mixture in continuously working mixer with continuous dosing of cement mixture components is accepted. The automated system designed for control and management of liquid radioactive wastes cementation in real time is represented [ru