WorldWideScience

Sample records for biomedical equipment maintenance

  1. Laboratory equipment maintenance: a critical bottleneck for strengthening health systems in sub-Saharan Africa?

    Science.gov (United States)

    Fonjungo, Peter N; Kebede, Yenew; Messele, Tsehaynesh; Ayana, Gonfa; Tibesso, Gudeta; Abebe, Almaz; Nkengasong, John N; Kenyon, Thomas

    2012-02-01

    Properly functioning laboratory equipment is a critical component for strengthening health systems in developing countries. The laboratory can be an entry point to improve population health and care of individuals for targeted diseases - prevention, care, and treatment of TB, HIV/AIDS, and malaria, plus maternal and neonatal health - as well as those lacking specific attention and funding. We review the benefits and persistent challenges associated with sustaining laboratory equipment maintenance. We propose equipment management policies as well as a comprehensive equipment maintenance strategy that would involve equipment manufacturers and strengthen local capacity through pre-service training of biomedical engineers. Strong country leadership and commitment are needed to assure development and sustained implementation of policies and strategies for standardization of equipment, and regulation of its procurement, donation, disposal, and replacement.

  2. Optimal Medical Equipment Maintenance Service Proposal Decision Support System combining Activity Based Costing (ABC) and the Analytic Hierarchy Process (AHP).

    Science.gov (United States)

    da Rocha, Leticia; Sloane, Elliot; M Bassani, Jose

    2005-01-01

    This study describes a framework to support the choice of the maintenance service (in-house or third party contract) for each category of medical equipment based on: a) the real medical equipment maintenance management system currently used by the biomedical engineering group of the public health system of the Universidade Estadual de Campinas located in Brazil to control the medical equipment maintenance service, b) the Activity Based Costing (ABC) method, and c) the Analytic Hierarchy Process (AHP) method. Results show the cost and performance related to each type of maintenance service. Decision-makers can use these results to evaluate possible strategies for the categories of equipment.

  3. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  4. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  5. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  6. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  7. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  8. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  9. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  10. 21 CFR 58.63 - Maintenance and calibration of equipment.

    Science.gov (United States)

    2010-04-01

    ... GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.63 Maintenance and... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Maintenance and calibration of equipment. 58.63..., maintenance, testing, calibration, and/or standardization of equipment, and shall specify, when appropriate...

  11. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  12. 21 CFR 211.67 - Equipment cleaning and maintenance.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment cleaning and maintenance. 211.67 Section 211.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... Equipment cleaning and maintenance. (a) Equipment and utensils shall be cleaned, maintained, and, as...

  13. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  14. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  15. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  16. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  17. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  18. The application and practice of predictive maintenance at CANDU equipment management

    International Nuclear Information System (INIS)

    Yu Guangting

    2014-01-01

    The equipment in Qinshan CANDU unit is characterized by large number and complex structure. Some equipment failure has no relation with the operation time, it is impossible to avoid the failure of these equipment only by periodical maintenance. To improve the equipment reliability, increase the equipment usability and decrease the maintenance cost, for important equipment related to nuclear safety and generating electricity, it is required to perform condition monitoring and the predictive maintenance (PdM). According to different characteristics of equipment, it is required to use suitable equipment condition monitoring method, content and frequency. In this way, some potential equipment failure can be found, preventive maintenance can be arranged in advance, and equipment maintenance management can be optimized. (author)

  19. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  20. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  1. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  2. 40 CFR 792.63 - Maintenance and calibration of equipment.

    Science.gov (United States)

    2010-07-01

    ... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.63 Maintenance and..., maintenance, testing, calibration, and/or standardization of equipment, and shall specify, when appropriate... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Maintenance and calibration of...

  3. 40 CFR 160.63 - Maintenance and calibration of equipment.

    Science.gov (United States)

    2010-07-01

    ...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Equipment § 160.63 Maintenance and calibration of..., maintenance, testing, calibration, and/ or standardization of equipment, and shall specify, when appropriate... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Maintenance and calibration of...

  4. Evaluation of artillery equipment maintenance support capability based on grey clustering

    Science.gov (United States)

    Zhai, Mei-jie; Gao, Peng

    2017-12-01

    This paper, the theory and method of evaluating the capability of equipment maintenance support in China and abroad are studied, from the point of view of the combat task of artillery troops and the strategic attachment in the future military struggle. This paper establishes the framework of the evaluation Index system of the equipment maintenance support capability of the artillery units, and applies the grey clustering method to the evaluation of the equipment maintenance support capability of the artillery units, and finally evaluates the equipment maintenance and support capability of the artillery brigade as an example, and analyzes the evaluation results. This paper finds out the outstanding problems existing in the maintenance and support of military equipment, and puts forward some constructive suggestions, in order to improve the status of military equipment maintenance and support and improve the level of future equipment maintenance.

  5. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  6. 30 CFR 49.6 - Equipment and maintenance requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Equipment and maintenance requirements. 49.6... TRAINING MINE RESCUE TEAMS § 49.6 Equipment and maintenance requirements. (a) Each mine rescue station... indicates that a corrective action is necessary, the corrective action shall be made and the person shall...

  7. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  8. Comprehensive framework for preventive maintenance priority of medical equipment.

    Science.gov (United States)

    Saleh, Neven; Balestra, Gabriella

    2015-08-01

    Throughout the medical equipment life cycle, preventive maintenance is considered one of the most important stages that should be managed properly. However, the need for better management and control by giving a reasonable prioritization for preventive maintenance becomes essential. The purpose of this study is to develop a comprehensive framework for preventive maintenance priority of medical equipment using Quality Function Deployment (QFD) and Fuzzy Logic (FL). The quality function deployment is proposed in order to identify the most important criteria that could impact preventive maintenance priority decision; meanwhile the role of the fuzzy logic is to generate a priority index of the list of equipment considering those criteria. The model validation was carried out on 140 pieces of medical equipment belonging to two hospitals. In application, we propose to classify the priority index into five classes. The results indicate that the strong correlation existence between risk-based criteria and preventive maintenance priority decision.

  9. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  10. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  11. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  12. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  13. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  14. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  15. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  16. 32 CFR 935.140 - Motor vehicle maintenance and equipment.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor vehicle maintenance and equipment. 935.140... AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.140 Motor vehicle maintenance and equipment. (a) Each person who has custody of a motor vehicle on Wake Island shall present that vehicle for...

  17. Mobile equipment maintenance at Elk Valley Coal Corporation Fording River

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Major loading and support equipment, haul trucks, and the number of staff and hourly tradesmen working in the maintenance manpower division at Elk Valley Coal are listed. Maintenance strategies are safety, high maintenance of equipment availabilities and reliability, cost reduction, and maximized productivity of assets. Maintenance assets comprise a large shop, shovel and drill crew, machine shop, light vehicle facility, line crew, radio technicians, and cranes. Most maintenance work is completed in- house. Fording River uses a Computerized Maintenance Management System (CMMS) that was developed in-house to match business needs. Several examples of the application of Reliability Centered Maintenance (RCM) are described. 12 figs., 2 tabs.

  18. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  19. Development of support system for maintenance and administration of reprocessing plant equipment

    International Nuclear Information System (INIS)

    Iwasaki, Syogo; Taniguchi, Takayuki; Shiraishi, Yoshihiko; Isaka, Kazuo

    1998-01-01

    Each year, maintenance work is carried out for about 10,000 pieces of equipment, including mechanical devices, electric equipment and instruments, at the Tokai Reprocessing Plant. Ninety percent of such maintenance work is preventive maintenance. In order to manage the information about the maintenance work, a computer support system was developed between 1985 and 1992. Twenty-seven thousand pieces of equipment and 180,000 maintenance histories have already been registered in the system. The system has been used for planning inspections and replacement of equipment as well as checking their maintenance histories. Actual usage of the system has shown that some auxiliary functions need to be added. The system will therefore be improved and extended. (author)

  20. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  1. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  2. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  3. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  4. 33 CFR 104.260 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... procedures for identifying and responding to security system and equipment failures or malfunctions. ...

  5. Planning of maintenance of electrical equipment in nuclear plants/laboratories [Paper No.: VB-3

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Bhattacharyya, A.K.

    1981-01-01

    Satisfactory operating performance of electrical systems ensures continuous availability of power to the various plants and machinery in nuclear plant and laboratories. For effective optimal functioning of the electrical equipment and to reduce their down time, scheduled planning of maintenance to the equipment is essential. Maintenance of power plant, nuclear or fossil, and industrial plant and research laboratories demands essential ingredients such as right type of trained and motivated technical personnel, adoption of standard procedures for maintenance, adequate safety and protection for equipment, safety procedures adopted in the installation to prevent hazards to the workers, provision of adequate stores and inventories, facilities for quick repairs and testing of equipment and effective planning of procedures for their maintenance. While breakdown maintenance allows equipment to operate before it is repaired or replaced, preventive maintenance makes use of scheduled inspection and periodical equipment overhaul and has little value for predicting future continuous performances of equipment. The engineered maintenance is most advantageous and offers maximum operating time to reduce down time of the equipment while adding predictive testing technique to aid in determining the frequency of overhaul of equipment. The important checks to be conducted and preventive maintenance programme to be scheduled are discussed in this paper. The safety and reliable functioning of the electrical equipment depend on proper optimal design, selection of equipment, their installation, subsequent maintenance and strict compliance with safety regulations. (author)

  6. Management of radiological related equipments. Creating the equipment management database and analysis of the repair and maintenance records

    International Nuclear Information System (INIS)

    Eguchi, Megumu; Taguchi, Keiichi; Oota, Takashi; Kajiwara, Hiroki; Ono, Kiyotune; Hagio, Kiyofumi; Uesugi, Ekizo; Kajishima, Tetuo; Ueda, Kenji

    2002-01-01

    In 1997, we established the committee of equipments maintenance and management in our department. We designed the database in order to classify and register all the radiological related equipments using Microsoft Access. The management of conditions and cost of each equipment has become easier, by keeping and recording the database in the equipments management ledger and by filing the history of repairs or maintenances occurred to modalities. We then accounted numbers, cost of repairs and downtimes from the data of the repair and maintenance records for four years, and we reexamined the causal analysis of failures and the contents of the regular maintenance for CT and MRI equipments that had shown the higher numbers of repairs. Consequently, we have found the improvement of registration method of the data and the more economical way to use of the cost of repair. (author)

  7. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  8. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  9. Maintenance of fire systems and equipment at Virginia Power

    International Nuclear Information System (INIS)

    Doubrely, E.B. Jr.

    1989-01-01

    The basics of fire protection systems maintenance are well codified and documented in the National Fire Codes published by the National Fire Protection Association. In addition, Insurers often promulgate minimum standards for fire protection systems design and maintenance to which they attach conditions of insurability. Regulatory agencies and even in-house corporate policies can impact the maintenance of fire protection systems and equipment. This presentation will focus on the various methods and alternate ways of performing system maintenance, whether required by code, insurer, or by some regulatory commitment at Virginia Powers North Anna and Surry nuclear power stations. The approach to performing similar work is handled differently at each station. This difference can be attributed to proximity to outside assistance as well as plant philosophy. In addition to station maintenance practices, a discussion of in-house servicing of portable fire suppression equipment is offered. 1 tab

  10. 33 CFR 106.255 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... Shelf (OCS) Facility Security Requirements § 106.255 Security systems and equipment maintenance. (a) Security systems and equipment must be in good working order and inspected, tested, calibrated, and...

  11. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  12. Diagnostics of heavy mining equipment during the scheduled preventive maintenance

    Science.gov (United States)

    Drygin, M. Yu; Kuryshkin, N. P.

    2018-01-01

    Intensification of production, economic globalization and dramatic downgrade of the workers’ professional skills lead to unacceptable technical state of heavy mining equipment. Equipment maintenance outage reaches 84 % of the total downtime, of which emergency maintenance takes up to 36 % of time, that excesses 429 hours per year fr one excavator. It is shown that yearly diagnostics using methods of non-destructive check allows to reduce emergency downtime by 47 %, and 55 % of revealed defects can be eliminated without breaking the technological cycle of the equipment.

  13. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  14. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  15. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  16. Procedure to evaluate and control efficiently the operations management of medical equipment in the maintenance unit of a health institution

    Directory of Open Access Journals (Sweden)

    Herrera-Galán Michael

    2018-01-01

    Full Text Available Maintenance management plays a very important role in the success of any company. As a consequence of this, in the year of 2013, a study was carried out in health facilities found in the South Eastern Region of Jamaica with the objective of evaluating the existing Maintenance Management Program for Medical Equipment. Among the results obtained, it showed that there is an inadequacy in the existing program whose principal deficiency is attributed to the operations management. As such, this work proposes a procedure for evaluating and controlling in an efficient manner the operations management within the Biomedical Department which forms part of the South East Regional Health Authority Maintenance Unit (SERHAMU, this latter is found on the premises of the Bustamante Hospital for Children (BHC, Jamaica. The method used to develop the procedure (GOMHO is based fundamentally on the design of: a codification system to identify control registers and to record failures associated with each equipment, a system of placing equipment into categories and further differentiating them based on the potential hazard such pose on the human body in the event of an operational failure. In addition, this procedure gives the SERHAMU at the BHC the opportunity to calculate the amount of human resources needed to carry out efficiently the preventative and corrective maintenance work being demanded on the department. During the implementation phase, the results demonstrated that from the control procedure designed there was an improvement in the planning and carrying out of maintenance work and a better system of monitoring the activities that are executed. Also, it was evidenced that there is a 61.53% of the amount of human resources needed to carry out the maintenance actions.

  17. 49 CFR 214.507 - Required safety equipment for new on-track roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... maintenance machines. 214.507 Section 214.507 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.507 Required safety equipment for new on-track roadway maintenance machines. (a) Each new on-track roadway maintenance machine shall be equipped with: (1...

  18. Facilities available for biomedical science research in the public universities in Lagos, Nigeria.

    Science.gov (United States)

    John, T A

    2010-03-01

    Across the world, basic medical scientists and physician scientists work on common platforms in state-of-the-arts laboratories doing translational research that occasionally results in bedside application. Biotechnology industries capitalise on useful findings for colossal profit.1 In Nigeria and the rest of Africa, biomedical science has not thrived and the contribution of publications to global high impact journals is low.2 This work investigated facilities available for modern biomedical research in Lagos public universities to extract culprit factors. The two public universities in Lagos, Nigeria were investigated by a cross sectional questionnaire survey of the technical staff manning biomedical science departments. They were asked about availability of 47 modern biomedical science research laboratory components such as cold room and microscopes and six research administration components such as director of research and grants administration. For convenient basic laboratory components such as autoclaves and balances, 50% responses indicated "well maintained and always functional" whereas for less convenient complex, high maintenance, state-of-the-arts equipment 19% responses indicated "well maintained and always functional." Respondents indicated that components of modern biomedical science research administration were 44% of expectation. The survey reveal a deficit in state-of the-arts research equipment and also a deficit in high maintenance, expensive equipment indicating that biomedical science in the investigated environment lacks the momentum of global trends and also lacks buoyant funding. In addition, administration supporting biomedical science is below expectation and may also account for the low contributions of research articles to global high impact journals.

  19. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage

    International Nuclear Information System (INIS)

    Zhou, Xiaojun; Wu, Changjie; Li, Yanting; Xi, Lifeng

    2016-01-01

    A periodic preventive maintenance modeling method is proposed for leased equipment with continuous internal degradation and stochastic external shock damage considered simultaneously, which can facilitate the equipment lessor to optimize the maintenance schedule for the same kind of equipment rented by different lessees. A novel interactive mechanism between the continuous internal degradation and the stochastic external shock damage is established on the hazard rate of the equipment with integrating the imperfect effect of maintenance. Two improvement factors are defined for the modeling of imperfect maintenance. The number of failures resulting from internal degradation and from external shocks are both mathematically deduced based on this interactive mechanism. The optimal preventive maintenance scheme is obtained by minimizing the cumulative maintenance cost throughout the lease period. Numerical example shows that the proposed preventive maintenance model not only can reflect the reliability status of the equipment but also can clearly distinguish between the impact from internal degradation and that from external shocks. - Highlights: • We propose an imperfect periodic preventive maintenance model for leased equipment. • It can distinguish between the impact from internal degradation and that from external shocks. • An internal–external interactive mechanism is proposed. • Two improvement factors are introduced into the modeling of imperfect maintenance. • The model is helpful for the PM scheduling of the same equipment rented by different lessees.

  20. 46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Science.gov (United States)

    2010-10-01

    ... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...

  1. Evolving technologies drive the new roles of Biomedical Engineering.

    Science.gov (United States)

    Frisch, P H; St Germain, J; Lui, W

    2008-01-01

    Rapidly changing technology coupled with the financial impact of organized health care, has required hospital Biomedical Engineering organizations to augment their traditional operational and business models to increase their role in developing enhanced clinical applications utilizing new and evolving technologies. The deployment of these technology based applications has required Biomedical Engineering organizations to re-organize to optimize the manner in which they provide and manage services. Memorial Sloan-Kettering Cancer Center has implemented a strategy to explore evolving technologies integrating them into enhanced clinical applications while optimally utilizing the expertise of the traditional Biomedical Engineering component (Clinical Engineering) to provide expanded support in technology / equipment management, device repair, preventive maintenance and integration with legacy clinical systems. Specifically, Biomedical Engineering is an integral component of the Medical Physics Department which provides comprehensive and integrated support to the Center in advanced physical, technical and engineering technology. This organizational structure emphasizes the integration and collaboration between a spectrum of technical expertise for clinical support and equipment management roles. The high cost of clinical equipment purchases coupled with the increasing cost of service has driven equipment management responsibilities to include significant business and financial aspects to provide a cost effective service model. This case study details the dynamics of these expanded roles, future initiatives and benefits for Biomedical Engineering and Memorial Sloan Kettering Cancer Center.

  2. Study on the Management for the Nuclear Power Plant Maintenance and Equipment Reliability

    International Nuclear Information System (INIS)

    Yoon, Kyeongseop; Lee, Sangheon; Kim, Myungjin; Lee, Unjang

    2015-01-01

    In our country, many studies on the regulatory policy of the plant maintenance have ever been performed since 1998, but the relevant regulatory requirements were not established yet. These background mentioned above request us to study on the regulation policy and maintenance plan to improve the safety, reliability and efficiency of NPP. To solve these problems, in this study, we deduct the management methodology for the improvement of NPP maintenance and equipment reliability that is essential to secure the safety and efficiency of the commercial NPP. For analysis the maintenance and equipment reliability management methodology in overseas NPP. We studied maintenance and equipment reliability of USA, Canada and Europe(France, England, German). We also studied status and application condition of Korean NPP maintenance management technical development. We deducted an effective maintenance methodology that is needed to Korean NPP, as a result of comparison on the technical trend of the maintenance management between overseas and Korean, such like following. - Regulation form ·Specific provision of regulation requirement and application of form that is clarifying application standard - Maintenance management methodology, Maintenance management program. This results of study could be applied for regulation policy, law and guideline establishment of NPP maintenance, operation, supervision and a system establishment for maintenance management, education data about maintenance for NPP employees

  3. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  4. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  5. Radiology equipment maintenance and contract procurement in the UK.

    Science.gov (United States)

    Wright, Christopher J

    2012-01-01

    Radiology equipment maintenance has a similar financial value to new device acquisition over the lifetime of the device. Comprehensive style contracts are dominant largely due to their ease of use and the potential to control budgetary costs, but costs are high. Creative procurement solutions can offer better value. The corrective portion of comprehensive contracts is estimated to be between 50% (Mobile C-Arm) to 92% (CT), which equates to $29.4 million; 80% of the total contract costs within the research population of this study. Many organizations could free up cash by better managing their maintenance costs, potentially creating funding opportunities for new equipment.

  6. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  7. Maintenance optimization plan for essential equipment reliability

    International Nuclear Information System (INIS)

    Steffen, D.H.

    1996-02-01

    The Maintenance Optimization Plan (MOP) for Essential Equipment Reliability will furnish Tank Waste Remediation System (TWRS) management with a pro-active, forward-thinking process for maintaining essential structures, systems, and components (ESSC) at the Hanford Site tank farms in their designed condition, and to ensure optimum ESSC availability and reliability

  8. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  9. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Tabor, M.A.

    1988-01-01

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  10. [Determining biomedical equipment calibration in health care Institutions in the Risaralda Department of Colombia].

    Science.gov (United States)

    López-Isaza, Giovanni A; Llamosa-Rincón, Luis E

    2008-01-01

    Determining quality features related to tracking biomedical equipment calibration patterns and their electrical safety as implemented by Health Care Institutions in the Risaralda department. This was a descriptive study using non-probabilistic sampling and the criterion of a greater equipment inventory and service demand for Clinics, Aesthetic, Radiology and Dentistry Centres and Hospitals. Census; the instrument was applied to 32 health-care institutions distributed throughout the Risaralda departments 14 municipalities between September 2005 and January 2006. Hospitals was the category having a highest number of electro-medical equipment (56%). Pereira (the capital of Risaralda) had 81% of all electro-medical equipment. All the institutions lacked NTC-ISO-IEC-17025 accreditation regarding standards certified by the Superintendence of Industry and Commerce. None of the institutions externally contracted by the institutions being surveyed was accredited. There is a public health risk in the Risaralda department; all health-care institutions lacked NTC-ISO-IEC-17025 accreditation and external institutions (in turn being hired by them for calibrating their equipment) also lacked accreditation. Based on the information obtained from non-calibrated equipment having international patterns, there is a great danger that determining the quality of biomedical equipment calibration patterns may be erroneous. It also places health-care institutions at a competitive disadvantage when compared to other accredited institutions in Colombia or in other countries.

  11. Supporting developers in addressing maintenance aspects: an empirical study in the industrial equipment manufacturing industry

    NARCIS (Netherlands)

    Mulder, W.

    2016-01-01

    Addressing maintenance aspects has become increasingly important in development projects of industrial equipment. Developers of such equipment need to address the maintenance aspects in order to achieve competitive equipment and service offerings. This research focuses on the identification of the

  12. 18 CFR 367.9350 - Account 935, Maintenance of structures and equipment.

    Science.gov (United States)

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Operation and Maintenance Expense Chart of Accounts § 367.9350 Account 935, Maintenance of structures and equipment. This account must include materials used and expenses incurred in the maintenance of property owned, the cost of which is included in accounts 390 through 399 (§§ 367.3900 through...

  13. 30 CFR 77.516 - Electric wiring and equipment; installation and maintenance.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric wiring and equipment; installation and... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.516 Electric wiring and equipment; installation and maintenance. In addition to the requirements of §§ 77.503 and 77.506, all wiring and...

  14. A MAINTENANCE STRATEGY MODEL FOR STATIC EQUIPMENT USING INSPECTION METHODOLOGIES AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    J.K. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Mechanical equipment used on process plants can be categorised into two main types, namely static and rotating equipment. A brief survey at a number of chemical process plants indicated that a number of maintenance strategies exist and are used for rotating equipment. However, some of these strategies are not directly applicable to static equipment, although the risk-based inspection (RBI methodology has been developed for pressure vessels. A generalised risk-based maintenance strategy for all types of static equipment does not currently exist. This paper describes the development of an optimised model of inspection methodologies, maintenance strategies, and risk management principles that are generically applicable for static equipment. It enables maintenance managers and engineers to select an applicable maintenance strategy and inspection methodology, based on the operational and business risks posed by the individual pieces of equipment.

    AFRIKAANSE OPSOMMING: Meganiese toerusting wat op prosesaanlegte gebruik word kan in twee kategorieë verdeel word, naamlik statiese en roterende toerusting. 'n Bondige ondersoek by 'n aantal chemiese prosesaanlegte het aangedui dat 'n aantal strategieë vir instandhouding van roterende toerusting gebruik word, terwyl die risikogebaseerde inspeksiemetodologie wel vir drukvate gebruik word. 'n Algemene risikogebaseerde instandhoudingstrategie vir alle tipes statiese toerusting is egter nie tans beskikbaar nie. Hierdie artikel beskryf die ontwikkeling van 'n geoptimeerde model van inspeksiemetodologieë, instandhoudingstrategieë, en risikobestuursbeginsels wat algemeen gebruik kan word vir statiese toerusting. Dit stel die instandhouding-bestuurders en -ingenieurs in staat om 'n instandhoudingstrategie en inspeksie-metodologie te kies, gebaseer op die operasionele en besigheidsrisiko's van die individuele toerusting.

  15. Supporting industrial equipment development through a set of design-for-maintenance guidelines

    NARCIS (Netherlands)

    Mulder, W.; Basten, Robertus Johannes Ida; Jauregui Becker, Juan Manuel; Blok, Jeroen; Hoekstra, Sipke; Kokkeler, Frans; Marjanovic, Dorian; Storga, Mario; Pavkovic, Neven; Bojcetic, Nenad

    2014-01-01

    This paper presents a leaflet with design-for-maintenance guidelines. It aims at supporting developers of industrial equipment in their design-for-maintenance practices. The use of this leaflet should lead to increased attention for design-for-maintenance aspects and to improve idea generation. The

  16. Decision Support Procedure for Medical Equipment Maintenance Management

    NARCIS (Netherlands)

    Masmoudi, Malek; Houria, Zeineb Ben; Al Hanbali, Ahmad; Masmoudi, Faouzi

    2016-01-01

    Hospitals outsource several activities of the service support in order to focus on the core healthcare production as maintenance service. Recently, faced to the sophistication and the costs of medical equipment that continue to escalate, governments have implemented new reforms to control costs and

  17. Management of radiodiagnostic equipment: Implementation of self-maintenance project of the conventional x-ray equipment of Hospital Universitario Clementino Fraga Filho - HUCFF-UFRJ

    International Nuclear Information System (INIS)

    Couto, N.F. do; Azevedo, A.C.P.; Koch, H.A.

    2001-01-01

    The project aims the implantation of a management program, for the maintenance of the conventional X-ray equipment at HUCFF. It has been implemented through the training of the electronic technicians who work at the Hospital. Essential courses were organized such as: Basics of Radioprotection, Radiographs Techniques, and Maintenance of equipment of X-Rays. Equipment: a library with the schemes of the equipment is being assembled in collaboration with UNICAMP. In order to manage the process, a software was created using the tools of the total quality for control of the maintenance. Preliminary tests: the equipment and their working conditions were evaluated, as well as the level of the employees' satisfaction with their use. The creation of a new routine for maintenance seeks to assist the demands of the new legislation in Brazil 5, and also reduce the costs to improve the quality of the images in the Radiodiagnostic Service. (author)

  18. [Hospital clinical engineer orientation and function in the maintenance system of hospital medical equipment].

    Science.gov (United States)

    Li, Bin; Zheng, Yunxin; He, Dehua; Jiang, Ruiyao; Chen, Ying; Jing, Wei

    2012-03-01

    The quantity of medical equipment in hospital rise quickly recent year. It provides the comprehensive support to the clinical service. The maintenance of medical equipment becomes more important than before. It is necessary to study on the orientation and function of clinical engineer in medical equipment maintenance system. Refer to three grade health care system, the community doctors which is called General practitioner, play an important role as the gatekeeper of health care system to triage and cost control. The paper suggests that hospital clinical engineer should play similar role as the gatekeeper of medical equipment maintenance system which composed by hospital clinical engineer, manufacture engineer and third party engineer. The hospital clinical engineer should be responsible of guard a pass of medical equipment maintenance quality and cost control. As the gatekeeper, hospital clinical engineer should take the responsibility of "General engineer" and pay more attention to safety and health of medical equipment. The responsibility description and future transition? development of clinical engineer as "General Engineer" is discussed. More attention should be recommended to the team building of hospital clinical engineer as "General Engineer".

  19. Underwater fuel handling equipment maintenance. Verification of design assumptions, specific problems and tools, case study

    International Nuclear Information System (INIS)

    Kurek, J.B.

    1995-01-01

    The majority of CANDU Fuel Transfer System equipment at Pickering is located under fourteen feet of water, as dictated by the containment and shielding requirements. Such arrangement, however, creates specific problems with equipment maintenance. Each single piece of equipment serves two generating units, which means in case of defect- double losses on production, or two units shut down simultaneously for planned maintenance. The requirement for underwater maintenance was not anticipated at the design stage, which multiples the level of difficulty, and creates requirement for developing special tools for each work. Removal of the damaged fuel from the receiving bays and decontamination of submerged equipment is also part of the problem. The purpose of this presentation is to share our experience with the designers, operators, maintenance mechanics and technical personnel of the other CANDU generating stations

  20. Maintenance and test strategies to optimize NPP equipment performance

    International Nuclear Information System (INIS)

    Mayer, S.; Tomic, B.

    2000-01-01

    This paper proposes an approach to maintenance optimization of nuclear power plant components, which can help to increase both safety and availability. In order to evaluate the benefits of preventive maintenance on a quantitative basis, a software code has been developed for component performance and reliability simulation of safety related nuclear power plant equipment. A three state Markov model will be introduced, considering a degraded state in addition to an operational state and a failed state. (author)

  1. Fleet equipment performance measurement preventive maintenance model : final report.

    Science.gov (United States)

    2014-04-01

    The concept of preventive maintenance is very important in the effective management and deployment of : vehicle fleets. The Texas Department of Transportation (TxDOT) operates a large fleet of on-road and offroad : equipment. Newer engines and vehicl...

  2. Maintenance of electronic equipment at the Saclay Nuclear Research Centre

    International Nuclear Information System (INIS)

    Chicheportiche, Armand; Raoult, Norbert.

    1975-06-01

    The Test-Repair Group of the Saclay Electronics Services ensures the maintenance of electronic equipment available to users of the Saclay site. The more and more frequent use of microelectronics in these instruments increases the electronic operator density and the working and data transmission sequences are becoming difficult to understand. This leads to complications in the adjustment, testing and repairs. Ways and means are studied to facilitate maintenance while reducing the immobilization time of the equipment and the repair costs. The Saclay Electronics Services have developed a method of systematic test sequence formulation and breakdown diagnosis based on the properties of binary analysis. This method is used by a supplier of the CEA which has built the corresponding test equipment. Owing to the test programmmes established for each component of an apparatus it is possible for example to locate a faulty element on a plan including more than 100 integrated circuits and to replace it in no more than 10 minutes [fr

  3. Overall Equipment Efficiency (OEE Enhancement in Manufacture of Electronic Components & Boards Industry through Total Productive Maintenance Practices

    Directory of Open Access Journals (Sweden)

    Fam Soo-Fen

    2018-01-01

    Full Text Available In an environment of intense global competition, both creative and proven strategies need to be considered in order to bring about the effectiveness and efficiency in manufacturing operation. Total Productive Maintenance (TPM is one of the effective maintenance strategy in enhancing the equipment effectiveness and to achieve a significant competitive advantage. This research paper addresses the impact of three TPM pillars namely planned maintenance (PM, autonomous maintenance (AM and focused maintenance (FM on overall equipment effectiveness (OEE of die attach equipment in the production line of semiconductor industry. The effect of TPM on the OEE is also investigated depending on the equipment types, in where die attach process consist of two models-CANON and ESEC. The primary data was collected from an organization's database and was analysed by SPSS V23. The preliminary results of the analysis showed that the performance of OEE in ESEC is better than the CANON after the implementation of TPM. The analysis also showed that out of the three TPM practices deployed, planned maintenance of equipment by production and maintenance team played the biggest role in increasing the equipment effectiveness. In conclusion, this study provides insights the importance of implementing TPM in order to succeed in a highly demanding market arena.

  4. Service for maintenance of electronic equipment of the RA reactor, Report for 1977 - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1977-01-01

    This report describes the tasks and organizational structure of the Service for maintenance of electronic equipment of the RA reactor. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment related to the experimental devices [sr

  5. Sound recordings of road maintenance equipment on the Lincoln National Forest, New Mexico

    Science.gov (United States)

    D. K. Delaney; T. G. Grubb

    2004-01-01

    The purpose of this pilot study was to record, characterize, and quantify road maintenance activity in Mexican spotted owl (Strix occidentalis lucida) habitat to gauge potential sound level exposure for owls during road maintenance activities. We measured sound levels from three different types of road maintenance equipment (rock crusherlloader,...

  6. The maintenance of nuclear medicine equipments: the stakes in the liberal sector

    International Nuclear Information System (INIS)

    Fauchet, M.; Chambon, T.; Tellier, P.

    1994-01-01

    Maintenance of nuclear medicine installations is an obligation in the private sector (preventive maintenance to be sure of the detectors quality and of the associated software and hardware, corrective maintenance to be sure of the results quality and of the installations profitability). They must be negotiated at the time of the installations choice and added to the total cost of the equipment. Gamma cameras are chosen for illustrating these maintenance problems. (A.B.). 5 refs., 7 figs

  7. Liquid Metal Fast Breeder Reactor plant maintenance and equipment design

    International Nuclear Information System (INIS)

    Swannack, D.L.

    1982-01-01

    This paper provides a summary of maintenance equipment considerations and actual plant handling experiences from operation of a sodium-cooled reactor, the Fast Flux Test Facility (FFTF). Equipment areas relating to design, repair techniques, in-cell handling, logistics and facility services are discussed. Plant design must make provisions for handling and replacement of components within containment or allow for transport to an ex-containment area for repair. The modular cask assemblies and transporter systems developed for FFTF can service major plant components as well as smaller units. The plant and equipment designs for the Clinch River Breeder Reactor (CRBR) plant have been patterned after successful FFTF equipment

  8. Maintenance of electromechanical equipment in quality organization under operating conditions

    International Nuclear Information System (INIS)

    Mercier, J.P.

    1984-01-01

    The paper outlines the principles adopted by the Thermal Production Service of Electricite de France on the basis of the experience of the first years of operation of its 900 MW(e)PWR units for the purpose of improving quality organization in operating conditions in respect of the maintenance of electromechanical safety equipment. This organization is based on application of the usual principles for quality assurance, adapted in accordance with current French regulations. The paper first recalls the now traditional methods of applying the principles of quality organization in the area of equipment maintenance. It then defines particular so-called ''delicate'' activities which, in accordance with the above regulations, are subjected to additional quality organizational procedures; this applies in particular to the area of pre-maintenance preparation and studies and to the control exercised by the French safety authorities over the execution of those activities. The paper explains how the application of the regulations improves maintenance practices compared with standard quality organization. It describes how the attempt to establish a frontier between these two types of activity (current and ''delicate'') has led to the definition of a classification criterion which is technically correct and simple to use and is based on the professional skills of those performing each activity. The paper then describes in greater detail the principal rules for the performance of those tasks which come under the standard organization and those to which more stringent criteria apply. Lastly, it explains the thinking behind equipment surveillance programmes and the analysis of anomalies discovered through surveillance measures or brought to light by operating incidents, the aim of these being to benefit from the experience gained

  9. Evidence-based approach to the maintenance of laboratory and medical equipment in resource-poor settings.

    Science.gov (United States)

    Malkin, Robert; Keane, Allison

    2010-07-01

    Much of the laboratory and medical equipment in resource-poor settings is out-of-service. The most commonly cited reasons are (1) a lack of spare parts and (2) a lack of highly trained technicians. However, there is little data to support these hypotheses, or to generate evidence-based solutions to the problem. We studied 2,849 equipment-repair requests (of which 2,529 were out-of-service medical equipment) from 60 resource-poor hospitals located in 11 nations in Africa, Europe, Asia, and Central America. Each piece of equipment was analyzed by an engineer or an engineering student and a repair was attempted using only locally available materials. If the piece was placed back into service, we assumed that the engineer's problem analysis was correct. A total of 1,821 pieces of medical equipment were placed back into service, or 72%, without requiring the use of imported spare parts. Of those pieces repaired, 1,704 were sufficiently documented to determine what knowledge was required to place the equipment back into service. We found that six domains of knowledge were required to accomplish 99% of the repairs: electrical (18%), mechanical (18%), power supply (14%), plumbing (19%), motors (5%), and installation or user training (25%). A further analysis of the domains shows that 66% of the out-of-service equipment was placed back into service using only 107 skills covering basic knowledge in each domain; far less knowledge than that required of a biomedical engineer or biomedical engineering technician. We conclude that a great majority of laboratory and medical equipment can be put back into service without importing spare parts and using only basic knowledge. Capacity building in resource-poor settings should first focus on a limited set of knowledge; a body of knowledge that we call the biomedical technician's assistant (BTA). This data set suggests that a supported BTA could place 66% of the out-of-service laboratory and medical equipment in their hospital back

  10. Concerning some problems of heavy equipment maintenance in the Maritsa-Iztok Combine

    Energy Technology Data Exchange (ETDEWEB)

    Khristov, B

    1979-09-01

    Discusses low quality of repairs on mining equipment which causes extensive periods of idleness. The central service base at Radnevo not only lacks capacity to do repairs on heavy excavating equipment but is also poorly equipped with mobile cranes and service trucks to keep up adequate maintenance activity at working sites. Limited supply of spare parts is partly due to decreasing imports and partly to the lack of production facilities at the central service base. Undue delays are also caused by a lack of access roads, for example, the Troyanovo 1 mine cannot be reached by road even during the summer season. There are constant fluctuations of technical personnel and the number of specialists remaining past their first contract period is decreasing. Integration of all maintenance and repair operations, establishment of advanced training facilities and more economic use of equipment is recommended. (In Bulgarian)

  11. METHODOLOGY OF DETERMINATION OF QUALITY INDEX OF MAINTENANCE SERVICE SYSTEM OF POWER EQUIPMENT OF TRACTION SUBSTATIONS

    Directory of Open Access Journals (Sweden)

    O.O. Matusevych

    2016-03-01

    Full Text Available Purpose. The purpose of this paper is development of methodology for definition of a quality system of maintenance and repair (M and P power equipment of traction substations (TS of electrified railways operating under conditions of uncertainty based on expert information. Methodology. The basic tenets of the theory of fuzzy sets and marks, linguistic and interval estimates of experts were applied to solve this problem. Results. Analysis of the existing diversity of approaches to development of modern methods of improvement of M and P allows us to conclude that the improvement in the quality of the system is achieved by solving individual problems increase the operational reliability of power equipment of traction substations in the following main interrelated areas. There are technical, economic and organizational. The basis of the quality evaluation system is initial data and expertise developed version of the document formalized quality evaluation of electrical equipment of traction substations by experts. The choice of determining the level of Quality service system based on the marks, linguistic and interval estimates of experts, which are reflected in quantitative and / or qualitative form was done. The possible options for expert data presentation and their corresponding quantitative methods of calculating the integral index of quality improvement system maintenance and P of traction substations were described. The methodology and the method of assessing the quality of system maintenance and P of TS allows quickly respond to changing operating conditions of power equipment of traction substations, and to determine the most effective strategies for maintenance of electrical and P TS under conditions of uncertainty functioning distance electricity. Originality. The method of a systematic approach to improve the quality of the system maintenance and P of power equipment of traction substation under conditions of uncertainty based on expert

  12. Risk-based equipment removal guide for on-line maintenance at PSE ampersand G

    International Nuclear Information System (INIS)

    Knoll, A.; Smith, C.; Pollock, J.

    1995-01-01

    On-line maintenance plays an important role in achieving safe and reliable power generation in a nuclear power plant. However, maintenance, if not properly planned and performed, may also be an important contributor to plant risk. Therefore, plant-specific procedures are needed for equipment removal from service to enhance the benefits of on-line maintenance and minimize the risks involved. The problem is to identify and implement the most effective on-line maintenance policy in the form of a proceduralized guide to assure plant safety under various operation and maintenance constraints. This paper presents a methodology to develop plant-specific on-line maintenance strategies and acceptance criteria using a multivariate safety approach based on risk assessment. Based on plant-specific data as modeled in the individual plant evaluation (IPE) and the updated probabilistic safety assessment (PSA), the risk-based methodology is currently being applied to the development of proceduralized equipment removal guides at Hope Creek and Salem units 1 and 2 of Public Service Electric and Gas Company (PSE ampersand G)

  13. Efficiency evaluation of an electronic equipment: availability,reliability and maintenance

    International Nuclear Information System (INIS)

    Guyot, C.

    1966-01-01

    This concept of efficiency often called ''system effectiveness'', is presented and analyzed in terms of reliability and maintenance. It allows to define the availability factor of an electronic equipment. A procedure of evaluation is proposed. (A.L.B.)

  14. 34 CFR 395.10 - The maintenance and replacement of vending facility equipment.

    Science.gov (United States)

    2010-07-01

    ... and replacement of vending facility equipment. The State licensing agency shall maintain (or cause to... 34 Education 2 2010-07-01 2010-07-01 false The maintenance and replacement of vending facility equipment. 395.10 Section 395.10 Education Regulations of the Offices of the Department of Education...

  15. Optimization of maintenance for power system equipment using a predictive health model

    NARCIS (Netherlands)

    Bajracharya, G.; Koltunowicz, T.; Negenborn, R.R.; Papp, Z.; Djairam, D.; Schutter, B.D. de; Smit, J.J.

    2009-01-01

    In this paper, a model-predictive control based framework is proposed for modeling and optimization of the health state of power system equipment. In the framework, a predictive health model is proposed that predicts the health state of the equipment based on its usage and maintenance actions. Based

  16. Study on a quantitative evaluation method of equipment maintenance level and plant safety level for giant complex plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2010-01-01

    In this study, a quantitative method on maintenance level which is determined by the two factors, maintenance plan and field work implementation ability by maintenance crew is discussed. And also a quantitative evaluation method on safety level for giant complex plant system is discussed. As a result of consideration, the following results were obtained. (1) It was considered that equipment condition after maintenance work was determined by the two factors, maintenance plan and field work implementation ability possessed by maintenance crew. The equipment condition determined by the two factors was named as 'equipment maintenance level' and its quantitative evaluation method was clarified. (2) It was considered that CDF in a nuclear power plant, evaluated by using a failure rate counting the above maintenance level was quite different from CDF evaluated by using existing failure rates including a safety margin. Then, the former CDF was named as 'plant safety level' of plant system and its quantitative evaluation method was clarified. (3) Enhancing equipment maintenance level means an improvement of maintenance quality. That results in the enhancement of plant safety level. Therefore, plant safety level should be always watched as a plant performance indicator. (author)

  17. The improvement of maintenance service for traction networks equipment on the base of process approach

    Directory of Open Access Journals (Sweden)

    D. V. Mironov

    2014-12-01

    Full Text Available Purpose. The new methods development for improving the maintenance service for equipment of traction networks in order to increase its efficiency and quality. Methodology. In world practice of solving problems related to the quality of products and services is usually achieved by introducing quality management system in to the enterprises. The provisions of quality management system were used for solving the problem. The technologies of process engineering were used for describing the main stages of maintenance service. Findings. The development of high-speed movement and growth of its intensity, the use of electric rolling stock of a new generation require the introduction of new methods diagnostics of equipment technical state and improvement of the existing maintenance system and repair of power supply. Developing a model of business-processes, their optimization with using techniques of process engineering and system management is needed for the transition to the management system based on the process approach. From the standpoint of the process approach and in accordance with the requirements of the quality management system (ISO 9001-2009, the operation of the E (Department of electrification and power supply infrastructure sector is represented as a scheme of business-processes in which the guaranteed supply with electricity of railway and third-party consumers is defined as the main business-process of management. Each of the sub-process of power supply for consumers is described in details. The use methods and main stages of process approach for sample management system reorganization were investigated. The methodology and the application method of PDCA (Plan-Do-Check-Act closed loop to the equipment maintenance system were described. The monitoring process of traction networks maintenance using the process approach was divided into components after investigations. The technical documentation of maintenance service was investigated in

  18. Activity of the Service for maintenance of the electronic equipment of the RA reactor in 1976, report - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1976-01-01

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system [sr

  19. 49 CFR 214.521 - Flagging equipment for on-track roadway maintenance machines and hi-rail vehicles.

    Science.gov (United States)

    2010-10-01

    ... maintenance machines and hi-rail vehicles. 214.521 Section 214.521 Transportation Other Regulations Relating... WORKPLACE SAFETY On-Track Roadway Maintenance Machines and Hi-Rail Vehicles § 214.521 Flagging equipment for on-track roadway maintenance machines and hi-rail vehicles. Each on-track roadway maintenance machine...

  20. 49 CFR 1242.42 - Administration, repair and maintenance, machinery repair, equipment damaged, dismantling retired...

    Science.gov (United States)

    2010-10-01

    ... repair, equipment damaged, dismantling retired property, fringe benefits, other casualties and insurance, lease rentals, joint facility rents, other rents, depreciation, joint facility, repairs billed to others... maintenance, machinery repair, equipment damaged, dismantling retired property, fringe benefits, other...

  1. A Novel Short-Term Maintenance Strategy for Power Transmission and Transformation Equipment Based on Risk-Cost-Analysis

    Directory of Open Access Journals (Sweden)

    Hang Yang

    2017-11-01

    Full Text Available Current studies on preventive condition-based maintenance of power transmission and transformation equipment mainly focus on mid-term or long-term maintenance, and cannot meet the requirements of short-term especially temporary maintenance. In order to solve the defects of the present preventive maintenance strategies, according to the engineering application and based on risk-cost analysis, a short-term maintenance strategy is proposed in this manuscript. For the equipment working in bad health condition, its active maintenance costs and operation risk costs are evaluated, respectively. Then the latest maintenance time is calculated in accordance with the principle that its operation risk costs are no higher than active maintenance costs. Utilizing the latest maintenance time, the best maintenance time is calculated by setting the maximum relative earnings of postponing maintenance as the target, which provides the operation staffs with comprehensive maintenance-decision support. In the end, different cases on the IEEE 24-bus system are simulated. The effectiveness and advantages of the proposed strategy are demonstrated by the simulation results.

  2. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem

    Science.gov (United States)

    Vahdani, Behnam; Jolai, Fariborz; Tavakkoli-Moghaddam, Reza; Meysam Mousavi, S.

    2012-07-01

    Maintenance outsourcing can be regarded as a strategic weapon to increase productivity and customer satisfaction in many companies, and this critical activity can be performed in a more efficient and effective way. This article presents two novel fuzzy possibilistic bi-objective zero-one programming (FPBOZOP) models for outsourcing of the equipment maintenance. In these models, cost parameters, including outsourcing cost, risk cost, time operations for performing the equipment maintenance and reliability level, as well as other influential parameters are considered through the outsourcing process. Moreover, the presented models can measure the capability of the company in doing different activities, unlike previous studies, in order to see the possibility of maintenance in-house, and can lead to make a best decision on the basis of the models' results. Both models are developed under uncertainty, which bring top managers the possibility of assigning more than one equipment or project to the supplier so that the profit is maximized, and the cost is minimized by considering bi-objectives concurrently. Then, a new fuzzy mathematical programming based possibilistic approach is introduced as a solution methodology from the recent literature to solve the proposed bi-objective zero-one programming (BOZOP) models and to reach a preferred compromise solution. Furthermore, a real-case study is utilized to demonstrate and to validate the effectiveness of the presented models. The computational results revealed that the models can be implemented in variety of problems in the domain of the equipment maintenance outsourcing and project outsourcing either from theory or application perspectives.

  3. Equipment for maintenance and repair of 900 MW PWR units in France

    International Nuclear Information System (INIS)

    Blary, F.; Castaing, C.; Haessig, M.

    1984-01-01

    As of March 1984, Electricite de France has been operating twenty-seven 900 MW PWR power units. To cut down unit unavailability and reduce the dosimetric requirements of maintenance staff, a wide range of special devices for inspecting and repairing equipment has been designed; details of 64 operational devices and a further 18 still being developed are given in a maintenance catalogue. This special equipment, together with maintenance and repair procedures, has been devised in collaboration with Framatome, the constructor of the nuclear island. One particular problem resolved was that of replacing the pins of the upper internals (UI) of 21 operational units, preventive measures having been taken at the other units. The strategy adopted consisted, first, in setting up a pin-changing workshop to enable the pins and guide tubes to be replaced separately and, second, in devising and applying wherever possible a method for partially replacing the guide tubes outside the critical path of the outage by means of a mobile pool known as the 'Aquarium'. (author)

  4. Fuel Handling Equipment Maintenance for Critical Path Time Savings

    Energy Technology Data Exchange (ETDEWEB)

    Saville, M.; Williams, A.

    2015-07-01

    By sharing lessons learned and operating experience gained by AREVA Stearns RogerTM Services from more than 45 years of servicing, maintaining, and upgrading Fuel Handling Equipment (FHE) and as the original equipment manufacturer to 56% of domestic U.S. FHE (PWR and BWR) as well as 19 units overseas, this paper presents trends and market forces that have led to the neglect of FHE, the risks of not adequately maintaining FHE, and the financial benefits of proactively maintaining FHE. The benefit to audiences is to come to a better understanding of how critical path delays can be avoided and thus reduce nuclear power plant operating costs. Note that statistics and monetary values given herein are based on recent typical experiences of AREVA Stearns RogerTM Services. Examples discussed are based on actual lessons learned. For the purposes of this paper, upgrades are considered a part of equipment maintenance unless specifically discussed separately. (Author)

  5. Preventive maintenance basis: Volume 21 -- HVAC, air handling equipment. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 21 of the report provides a program of PM tasks suitable for application to HVAC-Air Handling Equipment. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  6. Pengukuran Overall Equipment Effectiveness (Oee) Dengan Labview 8.5 Sebagai Pengendali Maintenance

    OpenAIRE

    Syarief, Syafrizal

    2015-01-01

    Total Productive Maintenance (TPM) is a philosophy that aims to maximize the effectiveness of the facilities used in industry, it is applied to analyze problems that occur on any equipment and machinery with a method of calculation of Overall Equipment Effectiveness (OEE) of product quality. Value is determined by OEE Availability, Performance and Yield / Quality. LabVIEW (Laboratory Virtual Instrument Engineering Workbench) software is dedicated to the activities of the interface and control...

  7. Predictive maintenance of critical equipment in industrial processes

    Science.gov (United States)

    Hashemian, Hashem M.

    This dissertation is an account of present and past research and development (R&D) efforts conducted by the author to develop and implement new technology for predictive maintenance and equipment condition monitoring in industrial processes. In particular, this dissertation presents the design of an integrated condition-monitoring system that incorporates the results of three current R&D projects with a combined funding of $2.8 million awarded to the author by the U.S. Department of Energy (DOE). This system will improve the state of the art in equipment condition monitoring and has applications in numerous industries including chemical and petrochemical plants, aviation and aerospace, electric power production and distribution, and a variety of manufacturing processes. The work that is presented in this dissertation is unique in that it introduces a new class of condition-monitoring methods that depend predominantly on the normal output of existing process sensors. It also describes current R&D efforts to develop data acquisition systems and data analysis algorithms and software packages that use the output of these sensors to determine the condition and health of industrial processes and their equipment. For example, the output of a pressure sensor in an operating plant can be used not only to indicate the pressure, but also to verify the calibration and response time of the sensor itself and identify anomalies in the process such as blockages, voids, and leaks that can interfere with accurate measurement of process parameters or disturb the plant's operation, safety, or reliability. Today, process data are typically collected at a rate of one sample per second (1 Hz) or slower. If this sampling rate is increased to 100 samples per second or higher, much more information can be extracted from the normal output of a process sensor and then used for condition monitoring, equipment performance measurements, and predictive maintenance. A fast analog-to-digital (A

  8. Application of IoT concept on predictive maintenance of industrial equipment

    Directory of Open Access Journals (Sweden)

    Parpala Radu Constantin

    2017-01-01

    Full Text Available The Internet of Things (IoT concept describes an intelligent connectivity of smart devices using the internet network. Nowadays, companies try different approaches for predictive maintenance as a solution to reduce costs and the frequency of maintenance activities. The IoT platforms provide a good support for predictive maintenance as it can integrate information from different machines and manufacturing systems. The main drawback in integrating production system with IoT dedicated platforms is the communication framework, knowing that the main industrial communication protocols are incompatible with modern communication protocols implemented on IoT platforms. In this context, the present paper proposes a new and simple method for on-line monitoring and predictive maintenance of industrial equipment. This method has two features of connected manufacturing. One of these is process monitoring for constant quality assurance, the other one is condition monitoring in order to prevent unplanned downtimes. A case study is presented to demonstrate the feasibility of the proposed method.

  9. A Decision Optimization Model for Leased Manufacturing Equipment with Warranty under Forecasting Production/Maintenance Problem

    Directory of Open Access Journals (Sweden)

    Zied Hajej

    2015-01-01

    Full Text Available Due to the expensive production equipment, many manufacturers usually lease production equipment with a warranty period during a finite leasing horizon, rather than purchasing them. The lease contract contains the possibility of obtaining an extended warranty for a given additional cost. In this paper, based on the forecasting production/maintenance optimization problem, we develop a mathematical model to study the lease contract with basic and extended warranty based on win-win relationship between the lessee and the lessor. The influence of the production rates in the equipment degradation consequently on the total cost by each side during the finite leasing horizon is stated in order to determine a theoretical condition under which a compromise-pricing zone exists under different possibilities of maintenance policies.

  10. Laboratory equipment maintenance contracts.

    Science.gov (United States)

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  11. Techniques and Emerging Trends for State of the Art Equipment Maintenance Systems—A Bibliometric Analysis

    Directory of Open Access Journals (Sweden)

    Burkhard Hoppenstedt

    2018-06-01

    Full Text Available The increasing interconnection of machines in industrial production on one hand, and the improved capabilities to store, retrieve, and analyze large amounts of data on the other, offer promising perspectives for maintaining production machines. Recently, predictive maintenance has gained increasing attention in the context of equipment maintenance systems. As opposed to other approaches, predictive maintenance relies on machine behavior models, which offer several advantages. In this highly interdisciplinary field, there is a lack of a literature review of relevant research fields and realization techniques. To obtain a comprehensive overview on the state of the art, large data sets of relevant literature need to be considered and, best case, be automatically partitioned into relevant research fields. A proper methodology to obtain such an overview is the bibliometric analysis method. In the presented work, we apply a bibliometric analysis to the field of equipment maintenance systems. To be more precise, we analyzed clusters of identified literature with the goal to obtain deeper insight into the related research fields. Moreover, cluster metrics reveal the importance of a single paper and an investigation of the temporal cluster development indicates the evolution of research topics. In this context, we introduce a new measure to compare results from different time periods in an appropriate way. In turn, among others, this simplifies the analysis of topics, with a vast amount of subtopics. Altogether, the obtained results particularly provide a comprehensive overview of established techniques and emerging trends for equipment maintenance systems.

  12. Remote-automated inspection and maintenance of nuclear power plant equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Masayoshi; Nakano, Yoshiyuki

    1984-12-01

    Employing remote-control inspection and maintenance equipment in nuclear power plants increases the plant availability by decreasing the annual shutdown time (outage), as well as radiation exposure and man-power. This paper presents an outline of the latest designs for an automatic refueling machine, a control rod drive handling machine, a fuel preparation machine, and a main steam line plug, which were supplied to the Fukushima Dai-Ni No. 2 Plant of the Tokyo Electric Power Co., Inc. (Fukushima 2-2). Also, the up-to-date developments of other new automatic machines, such as a CRD disassembly and cleaning system, spent fuel channel box volume reduction equipment, and robotics for nuclear plant use are presented.

  13. Experience in testing and inspection and maintenance of material handling equipments

    International Nuclear Information System (INIS)

    Sharma, M.L.

    2009-01-01

    All the Industries, Power Projects/Stations, Organizations engaged in the field of process of manufacturing, power generation, transportation, design, layout, manufacturing, and supply have to utilize material handling equipment, machinery tools tackles, lifting gears for performing their tasks/activities. The major role of the material handling equipments play an important role and a component of 40% of the total activities of the system/process to achieve targeted output with the reliability and quality is performed by material handling equipment and machineries. The material handling equipment shall have to be chosen/selected to suit the process requirement at times to be specifically designed inspected and tested to meet the specific requirement. These equipment/machineries/lifting gears have to undergo for the periodical inspection and testing to qualify for further use in a specified period. All those equipment and machinery to be used for material handling if not found satisfactory during inspection and testing or otherwise also shall be dismantled/stripped to the extent of inspection requirement of the components/sub components and maintenance repair shall have to be done to make them worthy for reuse after testing and inspection duly witnessed by competent authority

  14. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  15. Annual report of the group for maintenance of electronic equipment

    International Nuclear Information System (INIS)

    Popovic, B.

    1965-01-01

    Maintenance and repair of the RA reactor control and safety systems were uniformly distributed during the whole year and were done according to the annual plan. A series of repairs of he electronic equipment as well as exchange of electronic components and elec tonic tubes. The testing and calibration of control and protection circuits were done regularly according to the needs and operation state of the reactor and according to the instructions. Inspections, repairs and reconstructions well as operating characteristics of individual elements as well as complete electronic circuits during 1965 have shown da the systems of control and safety are still in good condition. Somewhat higher number of failures due to aging of electronic tubes is a regular consequence of equipment and instrumentation aging [sr

  16. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  17. Maintenance related to life management: Survey and control of equipment ageing

    International Nuclear Information System (INIS)

    Hevia Ruperez, F.

    2000-01-01

    The aim of this paper is to review relevant objectives and aspects of the Maintenance Evaluation and Improvement Programmes for Nuclear Power Plant Life Management. Recent experience shows that current maintenance practice often fails to directly address long-term degradation that affects singular plant components and equipment populations. Instead, delayed attention to the consequences makes good Life Management unfeasible. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to protect against, mitigate and/or monitor ageing that affects the safe, profitable life of the facility. The paper analyses the methodologies used, incidents during their application and the main conclusions reached from the implementation of these programmes in Spanish nuclear power plants. Special attention is paid to recommended solutions for improving the efficiency of the utility's contributions, its leadership in task development and integration, and its interfaces with organisations specialised in providing services that support Life Management Programmes. The coexistence of these and other similar maintenance programmes make it necessary to integrate tasks to optimise effort and tools. The paper analyses the guidelines to be considered when integrating these Programmes with other maintenance optimisation programmes (economy and feasibility, RCM) and with tasks derived from the application of Maintenance Rule regulatory requirements. Lastly, the paper reports on the state of these Maintenance Evaluation and Improvement Programmes, their development, what prospects they have, and the Industry's initiative and actions concerning the matter. (author)

  18. The Impact Of Occupational Hazards In Workplaces - Maintenance, A Main Target For Ensuring The Safety Of Working Equipment

    Science.gov (United States)

    Antonov, Anca Elena; Buica, Georgeta; Darabont, Doru Costin; Beiu, Constantin

    2015-07-01

    For use of work equipment having the economic performance and the highest level of safety, it must be ensured that it complies with the conditions set by the manufacturer in terms of putting into service, use and maintenance operations, ensuring appropriate technical and environmental requirements, including appropriate measures and means of protection. The research aimed to identify and analyze the occupational hazards associated to maintenance operations, in terms of the history of the adjustments, maintenance, cleaning and repair, including the case that occur after the incidents, capital repairs and upgrades. The results of the research consisted in the development of recommendations on the effective management of maintenance activities of work equipment and a software model to enable an efficient management of maintenance, as a tool for occupational hazards in companies - premise for increasing the competitiveness of employers in the market economy.

  19. Efficiency evaluation of an electronic equipment: availability,reliability and maintenance; Notion d'efficacite d'un equipement electronique: disponibilite, fiabilite et maintenabilite

    Energy Technology Data Exchange (ETDEWEB)

    Guyot, C

    1966-07-01

    This concept of efficiency often called ''system effectiveness'', is presented and analyzed in terms of reliability and maintenance. It allows to define the availability factor of an electronic equipment. A procedure of evaluation is proposed. (A.L.B.)

  20. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    International Nuclear Information System (INIS)

    DALE, R.N.

    2000-01-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O and M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085

  1. Financial report on the investment and maintenance of the RA reactor and equipment, Annex 5

    International Nuclear Information System (INIS)

    2002-01-01

    For the purpose of maintenance of the RA reactor building and equipment, Serbian Ministry of science, technology and development has approved financial support for the following: purchase and installing 12 new battery cells in the reactor building, for purchase of the missing fire protection equipment, and purchasing the material for protection of the roof of the ventilation center. All the planned tasks were fulfilled [sr

  2. Kennedy's Biomedical Laboratory Makes Multi-Tasking Look Easy

    Science.gov (United States)

    Dunn, Carol Anne

    2009-01-01

    If it is one thing that Florida has in abundance, it is sunshine and with that sunshine heat and humidity. For workers at the Kennedy Space Center that have to work outside in the heat and humidity, heat exhaustion/stroke is a real possibility. It might help people to know that Kennedy's Biomedical Laboratory has been testing some new Koolvests(Trademark) that can be worn underneath SCAPE suits. They have also been working on how to block out high noise levels; in fact, Don Doerr, chief of the Biomedical Lab, says, "The most enjoyable aspect is knowing that the Biomedical Lab and the skills of its employees have been used to support safe space flight, not only for the astronaut flight crew, but just as important for the ground processing personnel as well." The NASA Biomedical Laboratory has existed in the John F. Kennedy's Operations and Checkout Building since the Apollo Program. The primary mission of this laboratory has been the biomedical support to major, manned space programs that have included Apollo, Apollo-Soyuz, Skylab, and Shuttle. In this mission, the laboratory has been responsible in accomplishing much of the technical design, planning, provision, fabrication, and maintenance of flight and ground biomedical monitoring instrumentation. This includes the electronics in the launch flight suit and similar instrumentation systems in the spacecraft. (Note: The Lab checked out the system for STS-128 at Pad A using Firing room 4 and ground support equipment in the lab.) During Apollo, there were six engineers and ten technicians in the facility. This has evolved today to two NASA engineers and two NASA technicians, a Life Science Support contract physiologist and part-time support from an LSSC nurse and physician. Over the years, the lab has enjoyed collaboration with outside agencies and investigators. These have included on-site support to the Ames Research Center bed rest studies (seven years) and the European Space Agency studies in Toulouse, France (two

  3. Enhancing biomedical design with design thinking.

    Science.gov (United States)

    Kemnitzer, Ronald; Dorsa, Ed

    2009-01-01

    The development of biomedical equipment is justifiably focused on making products that "work." However, this approach leaves many of the people affected by these designs (operators, patients, etc.) with little or no representation when it comes to the design of these products. Industrial design is a "user focused" profession which takes into account the needs of diverse groups when making design decisions. The authors propose that biomedical equipment design can be enhanced, made more user and patient "friendly" by adopting the industrial design approach to researching, analyzing, and ultimately designing biomedical products.

  4. Configuration control during maintenance of safety related equipment

    International Nuclear Information System (INIS)

    Irish, C.S.

    2001-01-01

    Possibly the most important aspect of performing maintenance of safety related equipment is maintaining the component's original design basis. Assuring that the repaired item will perform the same safety function within the original performance and equipment qualification parameters is commonly referred to as configuration control. Maintaining configuration control of a technologically current well documented item is easy. Unfortunately, this does not describe most safety related items requiring maintenance within the global nuclear industry. Items such as motors, transformers, metal clad switchgear (low and medium voltage circuit breakers), refrigeration compressors, and electronic components (i.e. circuit boards, power supplies, regulators, etc.) which routinely require repair have been in service for twenty plus years. As a result, finding replacement parts and or material to repair the items to the original condition is becoming more and more difficult. An added difficulty is the lack of original technical documentation available on the item which is being repaired. The lack of technical documentation makes it difficult to identify replacement material and parts when the original part or material is not available. The lack of documentation also makes it difficult to test the repaired item to make sure that the original configuration has been maintained after the repair. The presentation will discuss the details of repairing various items including motors, metal clad switchgear, refrigeration compressors and power supplies and the controls which are necessary to maintain the configuration of the original item. The discussion will include the Quality Assurance and engineering necessary to identify and evaluate replacement material and parts necessary to perform repairs on safety related equipment when the original material or part is not available. Examples of repairs which required different parts or materials than the original to be used in the repair will be

  5. Configuration control during maintenance of safety related equipment

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    Possibly the most important aspect of performing maintenance of safety related equipment is maintaining the component's original design basis. Assuring that the repaired item will perform the same safety function within the original performance and equipment qualification parameters is commonly referred to as configuration control. Maintaining configuration control of a technologically current well documented item is easy. Unfortunately, this does not describe most safety related items requiring maintenance within the global nuclear industry. Items such as motors, transformers, metal clad switchgear (low and medium voltage circuit breakers), refrigeration compressors, and electronic components (i.e. circuit boards, power supplies, regulators, etc.) which routinely require repair have been in service for twenty plus years. As a result, finding replacement parts and or material to repair the items to the original condition is becoming more and more difficult. An added difficulty is the lack of original technical documentation available on the item which is being repaired. The lack of technical documentation makes it difficult to identify replacement material and parts when the original part or material is not available. The lack of documentation also makes it difficult to test the repaired item to make sure that the original configuration has been maintained after the repair. The presentation will discuss the details of repairing various items including motors, metal clad switchgear, refrigeration compressors and power supplies and the controls which are necessary to maintain the configuration of the original item. The discussion will include the Quality Assurance and engineering necessary to identify and evaluate replacement material and parts necessary to perform repairs on safety related equipment when the original material or part is not available. Examples of repairs which required different parts or materials than the original to be used in the repair will be

  6. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  7. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy : final report.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  8. Design and preliminary validation of a mobile application-based expert system to facilitate repair of medical equipment in resource-limited health settings

    Directory of Open Access Journals (Sweden)

    Wong AL

    2018-05-01

    Full Text Available Alison L Wong,1,2 Kelly M Lacob,1 Madeline G Wilson,1 Stacie M Zwolski,1 Soumyadipta Acharya1 1Center for Bioengineering, Innovation and Design, Johns Hopkins University, Baltimore, MD, USA; 2Division of Plastic Surgery, Dalhousie University, Halifax, NS, Canada Background: One of the greatest barriers to safe surgery is the availability of functional biomedical equipment. Biomedical technicians play a major role in ensuring that equipment is functional. Following in-field observations and an online survey, a mobile application was developed to aid technicians in troubleshooting biomedical equipment. It was hypothesized that this application could be used to aid technicians in equipment repair, as modeled by repair of a pulse oximeter.Methods: To identify specific barriers to equipment repair and maintenance for biomedical technicians, an online survey was conducted to determine current practices and challenges. These findings were used to guide the development of a mobile application system that guides technicians through maintenance and repair tasks. A convenience sample of technicians in Ethiopia tested the application using a broken pulse oximeter task and following this completed usability and content validity surveys.Results: Fifty-three technicians from 13 countries responded to the initial survey. The results of the survey showed that technicians find equipment manuals most useful, but these are not easily accessible. Many do not know how to or are uncomfortable reaching out to human resources. Thirty-three technicians completed the broken pulse oximeter task using the application. All were able to appropriately identify and repair the equipment, and post-task surveys of usability and content validity demonstrated highly positive scores (Agree to Strongly Agree on both scales.Discussion: This research demonstrates the need for improved access to resources for technicians and shows that a mobile application can be used to address a gap in

  9. Maintenance service contract model for heavy equipment in mining industry using principal agent theory

    Science.gov (United States)

    Pakpahan, Eka K. A.; Iskandar, Bermawi P.

    2015-12-01

    Mining industry is characterized by a high operational revenue, and hence high availability of heavy equipment used in mining industry is a critical factor to ensure the revenue target. To maintain high avaliability of the heavy equipment, the equipment's owner hires an agent to perform maintenance action. Contract is then used to control the relationship between the two parties involved. The traditional contracts such as fixed price, cost plus or penalty based contract studied is unable to push agent's performance to exceed target, and this in turn would lead to a sub-optimal result (revenue). This research deals with designing maintenance contract compensation schemes. The scheme should induce agent to select the highest possible maintenance effort level, thereby pushing agent's performance and achieve maximum utility for both parties involved. Principal agent theory is used as a modeling approach due to its ability to simultaneously modeled owner and agent decision making process. Compensation schemes considered in this research includes fixed price, cost sharing and revenue sharing. The optimal decision is obtained using a numerical method. The results show that if both parties are risk neutral, then there are infinite combination of fixed price, cost sharing and revenue sharing produced the same optimal solution. The combination of fixed price and cost sharing contract results in the optimal solution when the agent is risk averse, while the optimal combination of fixed price and revenue sharing contract is obtained when agent is risk averse. When both parties are risk averse, the optimal compensation scheme is a combination of fixed price, cost sharing and revenue sharing.

  10. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    Energy Technology Data Exchange (ETDEWEB)

    DALE, R.N.

    2000-05-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

  11. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  12. Management information system of medical equipment using mobile devices

    Science.gov (United States)

    Núñez, C.; Castro, D.

    2011-09-01

    The large numbers of technologies currently incorporated into mobile devices transform them into excellent tools for capture and to manage the information, because of the increasing computing power and storage that allow to add many miscellaneous applications. In order to obtain benefits of these technologies, in the biomedical engineering field, it was developed a mobile information system for medical equipment management. The central platform for the system it's a mobile phone, which by a connection with a web server, it's capable to send and receive information relative to any medical equipment. Decoding a type of barcodes, known as QR-Codes, the management process is simplified and improved. These barcodes identified the medical equipments in a database, when these codes are photographed and decoded with the mobile device, you can access to relevant information about the medical equipment in question. This Project in it's actual state is a basic support tool for the maintenance of medical equipment. It is also a modern alternative, competitive and economic in the actual market.

  13. 14 CFR Appendix A to Part 91 - Category II Operations: Manual, Instruments, Equipment, and Maintenance

    Science.gov (United States)

    2010-01-01

    ... June 26, 1979, two sensitive altimeters adjustable for barometric pressure, having markings at 20-foot... date of submission— (1) The ILS localizer and glide slope equipment were bench checked according to the... that are listed in the proposed maintenance program were bench checked and found to meet the...

  14. Report on coal refining and chemical equipment analogous to coal liquefaction equipment in fiscal 1981. Maintenance of equipment for direct desulfurization, indirect desulfurization, and fluidized catalytic cracking; 1981 nendo sekitan ekika ruiji seiyu seisei oyobi kagaku sochi ni kansuru chosa hokokusho. Chokudatsu, kandatsu, ryudo sesshoku bunkai sochi no hozen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    This questionnaire survey was intended to investigate the actual state of maintenance such as materials used, conditions for use, anti-corrosion measures, and cases and handling of damage, concerning primary apparatus in the direct/indirect desulfurization equipment and the fluidized catalytic crackers, which are owned by each oil refinery and which are analogous to coal liquefaction equipment. The questionnaire was intended for the following equipment and apparatus, with the actual state of their maintenance investigated. 1. Questionnaire concerning maintenance of direct desulfurization (reactor, high temperature separation tank, material furnace tube, reactor exit piping, high temperature heat exchanger, low temperature heat exchanger, and pressure reducing valve), 2. Questionnaire concerning maintenance of indirect desulfurization (reactor, high temperature separation tank, material furnace tube, reactor exit piping, high temperature heat exchanger, low temperature heat exchanger, and pressure reducing valve), 3. Questionnaire concerning maintenance of fluidized catalytic cracker (reactor, regeneration tower, riser pipe, and fractionator bottom pump). The questionnaire this time was distributed to 27 domestic oil companies, with the reply received from 23 of them. The replies were summarized by each type of equipment. Shown at the back of the report were the cases of damage and handling in FCC's and reactors. (NEDO)

  15. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    OpenAIRE

    Orlando Duran; Andrea Capaldo; Paulo Andrés Duran Acevedo

    2017-01-01

    Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despi...

  16. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  17. Integrated Instrumentation and Sensor Systems Enabling Condition-Based Maintenance of Aerospace Equipment

    Directory of Open Access Journals (Sweden)

    Richard C. Millar

    2012-01-01

    Full Text Available The objective of the work reported herein was to use a systems engineering approach to guide development of integrated instrumentation/sensor systems (IISS incorporating communications, interconnections, and signal acquisition. These require enhanced suitability and effectiveness for diagnostics and health management of aerospace equipment governed by the principles of Condition-based maintenance (CBM. It is concluded that the systems engineering approach to IISS definition provided clear benefits in identifying overall system requirements and an architectural framework for categorizing and evaluating alternative architectures, relative to a bottom up focus on sensor technology blind to system level user needs. CBM IISS imperatives identified include factors such as tolerance of the bulk of aerospace equipment operational environments, low intrusiveness, rapid reconfiguration, and affordable life cycle costs. The functional features identified include interrogation of the variety of sensor types and interfaces common in aerospace equipment applications over multiplexed communication media with flexibility to allow rapid system reconfiguration to adapt to evolving sensor needs. This implies standardized interfaces at the sensor location (preferably to open standards, reduced wire/connector pin count in harnesses (or their elimination through use of wireless communications.

  18. Application of new control technology during the maintenance of equipment in the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Ojeda R, M. A.

    2008-01-01

    In the nuclear power plant of Laguna Verde, in normal operation and recharges are carried out activities of preventive maintenance and corrective to different equipment, due to the one displacement of radioactive materials from the vessel of the reactor until the one system of vapor, different radiation levels are generated (from low until very high) in the circuits of vapor and water, the particles can be incrusted on those interior surfaces of the pipes and equipment, creating this way a potential risk of contamination and exhibition during the maintenance of equipment. To help to optimize the dose to the personnel the use of new technology the has been implemented which besides contributing an absolute control of the work, it offers bigger comfort to the one worker during the development of their work, also contributing a supervision more effective of the same one. Using the captured and processed information of the work developed you can use for the personnel's capacitation and feedback of the work for the continuous improvement of the same one. During a reduction of programmed power and normal operation are carried out maintenance correctives and specific works to preserve the readiness and ability of the equipment and with this to maintain the security of the nuclear power plant. The development of the theme it is showing the advances and commitments of personnel to take to excellence to the nuclear power plant of Laguna Verde showing to the obtained results of the dose and benefits of 2 works carried out in the nuclear power plant where tools ALARA were applied as well as the use of the new technology (Video Equipment of Tele dosimetry and Audio 'VETA') in works carried out in the building of purification level 10.15, change and cuts of filter of the prefilters of system G16, as well as,the retirement and transfer for its decay of High Integrity Container (HIC) of the building of purification level -0.55 to the Temporary Warehouse in Site. Works of high

  19. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  20. Decontamination chamber for the maintenance of DUPIC nuclear fuel fabrication and process equipment

    International Nuclear Information System (INIS)

    Kim, K. H.; Park, J. J.; Yang, M. S.; Lee, H. H.; Shin, J. M.

    2000-10-01

    This report presents the decontamination chamber of being capable of decontaminating and maintaining DUPIC nuclear fuel fabrication equipment contaminated in use. The decontamination chamber is a closed room in which contaminated equipment can be isolated from a hot-cell, be decontaminated and be reparired. This chamber can prevent contamination from spreading over the hot-cell, and it can also be utilized as a part of the hot-cell after maintenance work. The developed decontamination chamber has mainly five sub-modules - a horizontal module for opening and closing a ceil of the chamber, a vertical module for opening and closing a side of the chamber, a subsidiary door module for enforcing the vertical opening/closing module, a rotary module for rotating contaminated equipment, and a grasping module for holding a decontamination device. Such sub-modules were integrated and installed in the M6 hot-cell of the IMEF at the KAERI. The mechanical design considerations of each modules and the arrangement with hot-cell facility, remote operation and manipulation of the decontamination chamber are also described

  1. Decontamination chamber for the maintenance of DUPIC nuclear fuel fabrication and process equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, K. H.; Park, J. J.; Yang, M. S.; Lee, H. H.; Shin, J. M

    2000-10-01

    This report presents the decontamination chamber of being capable of decontaminating and maintaining DUPIC nuclear fuel fabrication equipment contaminated in use. The decontamination chamber is a closed room in which contaminated equipment can be isolated from a hot-cell, be decontaminated and be reparired. This chamber can prevent contamination from spreading over the hot-cell, and it can also be utilized as a part of the hot-cell after maintenance work. The developed decontamination chamber has mainly five sub-modules - a horizontal module for opening and closing a ceil of the chamber, a vertical module for opening and closing a side of the chamber, a subsidiary door module for enforcing the vertical opening/closing module, a rotary module for rotating contaminated equipment, and a grasping module for holding a decontamination device. Such sub-modules were integrated and installed in the M6 hot-cell of the IMEF at the KAERI. The mechanical design considerations of each modules and the arrangement with hot-cell facility, remote operation and manipulation of the decontamination chamber are also described.

  2. New technology for optimized I and C maintenance and management of ageing of critical equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2000-01-01

    Advanced sensors and new testing and maintenance technologies have become available over the last ten years for nuclear power plants (NPPs) to replace outdated, obsolete, and troublesome instruments, provide for management of ageing of critical plant equipment, optimize maintenance activities, reduce maintenance costs and personnel radiation exposure, and at the same time, improve plant safety and availability. These new developments are reviewed in this TECDOC. The material covered here has been summarized from NUREG/CR-5501, a 1998 report written by H.M. Hashemian and his co-authors for the US Nuclear Regulatory Commission. (author)

  3. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  4. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  5. Proposal for the award of a contract for the maintenance of industrial transport and handling equipment

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the maintenance of industrial transport and handling equipment. Following a market survey carried out among 145 firms in sixteen Member States, a call for tenders (IT-3049/ST) was sent on 8 May 2002 to two firms and four consortia, one consortium consisting of three firms and three consortia consisting of two firms, in three Member States. By the closing date, CERN had received six tenders from six consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC (FR), SPIE-TRINDEL (FR), ELECTRON (NL) and FENWICK-LINDE (FR), the lowest bidder after alignment, for the maintenance of industrial transport and handling equipment for a total amount of 2 973 280 euros (4 346 900 Swiss francs), covering an initial period of three years starting on 1 October 2002, subject to revision for inflation from 1 October 2005. The contract will include an option for two further one-year extensions beyond t...

  6. Development of the maintenance process by the servo manipulator for the parts of the equipment outside the MSM's workspace in a hot cell

    International Nuclear Information System (INIS)

    Lee, J. Y.; Kim, S. H.; Song, D. K.; Park, B. S.; Yun, G. S.

    2003-01-01

    In this study, the maintenance process by the servo manipulator for the parts of the equipment that cannot be reached by MSM in the hot cell was developed. To do this, the virtual mock up is implemented using virtual prototyping technology. And, Using this mock-up, the workspace of the manipulators in the hot cell and the operator's view through the wall-mounted lead glass are analyzed. And the path planning of the servo manipulator using the collision detection of the virtual mockup is established. Also, the maintenance process for the parts of the equipment that are located out area of the MSM's workspace by the servo manipulator is proposed and verified through the graphic simulation. The proposed remote maintenance process of the equipment can be effectively used in the real hot cell operation. Also, the implemented virtual mock-up of the hot cell can be effecively used in analyzing the various hot cell operation and in enhancing the reliability and safety of the spent fuel manaement

  7. Results of potential exposure assessments during the maintenance and cleanout of deposition equipment

    Energy Technology Data Exchange (ETDEWEB)

    Zimmermann, E., E-mail: eric.zimmermann@cea.fr; Derrough, S.; Locatelli, D.; Durand, C.; Fromaget, J. L.; Lefranc, E.; Ravanel, X.; Garrione, J. [Nanosafety Platform, CEA, DRT (France)

    2012-10-15

    This study is a compilation of results obtained during the cleanout of deposition equipment such as chemical vapor deposition or physical vapor deposition The measurement campaigns aimed to evaluate the potential exposure to nanoaerosols in the occupational environment and were conducted in the workspace. The characterization of aerosols includes measurements of the concentration using condensation particle counters and measurements of the size distribution using fast mobility particle sizer, scanning mobility particle sizer, and electrical low pressure impactor (ELPI). Particles were sampled using collection membranes placed on the ELPIs stages. The samples were analyzed with an SEM-EDS to provide information including size, shape, agglomeration state, and the chemical composition of the particles. The majority of the time, no emission of nanoparticles (NPs) was measured during the use of the molecular deposition equipment or when opening the chambers, mainly due to the enclosed processes. On the other hand, the maintenance of the equipment, and especially the cleanout step, could induce high concentrations of NPs in the workplace following certain processes. Values of around 1 million particles/cm{sup 3} were detected with a size distribution including a high concentration of particles around 10 nm.

  8. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  9. Plant equipment integrity monitoring and diagnosing method and device therefor, plant equipment maintenance and inspection time determining method and device therefor, as well as nuclear power plant

    International Nuclear Information System (INIS)

    Kato, Takahiko; Ando, Masashi; Osumi, Katsumi; Horiuchi, Tetsuo; Asakura, Yamato; Akamine, Kazuhiko.

    1995-01-01

    The present invention can accurately forecast a time for occurrence of troubles of plant equipments in contact with recycling water, to conduct its maintenance and inspection before occurrence of the troubles. Namely, change of water quality in plant equipments caused by corrosion of recycling water occurred in constitutional parts of the plant equipments is measured. The time upon occurrence of the troubles of the plant equipments to corrosion of the recycling water is forecast based on the measured value. A time till the occurrence of the change of water quality after starting the use of the plant equipments is calculated based on the measured value. The calculated time is compared with a correlation between the time of occurrence of the troubles after starting the use of the plant equipments and the time of occurrence of change of the water quality, to forecast the time of occurrence of the troubles. Preferably, electroconductivity and pH of recycling water in the inside or at the exit of the plant equipments are measured as an object for the measurement of change of water quality. (I.S.)

  10. Total Productive Maintenance at Paccar INC

    OpenAIRE

    Ştefan Farkas

    2010-01-01

    This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  11. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex E - Report of the electric Equipment Service

    International Nuclear Information System (INIS)

    Sanovic, V.; Stamenkovic, D.

    1985-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  12. The MERC maintenance system

    International Nuclear Information System (INIS)

    Izquierdo, J.J.; Chauvire, P.; Plessis, L.

    1991-01-01

    Maintenance in the modern commercial reprocessing plants is a subject of the highest priority in order to guarantee availability for the whole life of the plant. The design concept of the UP3 reprocessing plant at La Hague identified several categories of equipment according to their maintenance design principles. Among them, Standard Process Equipment such as pumps, valves, ejectors and filters which need periodic maintenance. These equipment items are designed in removable modular form to avoid the need to disconnect piping. Removal is performed under shielding and without breach of containment through the use of a transfer cask that is connected to the cell containing the equipment to be removed. This transfer cask is called MERC (Mobile Equipment Replacement Cask). Containment is preserved by an air-tight system consisting of coupled doors, with a special connecting gasket. This system can remove and replace failed equipment, without spreading contamination to work areas. (author)

  13. Total Productive Maintenance at Paccar INC

    Directory of Open Access Journals (Sweden)

    Ştefan Farkas

    2010-06-01

    Full Text Available This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  14. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  15. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  16. Analysis of total productive maintenance (TPM) implementation using overall equipment effectiveness (OEE) and six big losses: A case study

    Science.gov (United States)

    Martomo, Zenithia Intan; Laksono, Pringgo Widyo

    2018-02-01

    In improving the productivity of the machine, the management of the decision or maintenance policy must be appropriate. In Spinning II unit at PT Apac Inti Corpora, there are 124 ring frame machines that often have breakdown and cause a high downtime so that the production target is not achieved, so this research was conducted on the ring frame machine. This study aims to measure the value of equipment effectiveness, find the root cause of the problem and provide suggestions for improvement. This research begins with measuring the achievement of overall equipment effectiveness (OEE) value, then identifying the six big losses that occur. The results show that the average value of OEE in the ring frame machine is 79.96%, the effectiveness value is quite low because the standard of OEE value for world class company ideally is 85%. The biggest factor that influences the low value of OEE is performance rate with percentage factor six big losses at reduced speed losses of 17.303% of all time loss. Proposed improvement actions are the application of autonomous maintenance, providing training for operators and maintenance technicians and supervising operators in the workplace.

  17. 浅谈医疗设备管理中的预防性维护%On advantages and disadvantages of preventive maintenance for medical equipments

    Institute of Scientific and Technical Information of China (English)

    张宜江; 焦明阳

    2012-01-01

    目的:医疗设备是医院现代化建设的物质基础,加强医疗设备管理,使医疗设备预防性维护(PM)成为医院现代化管理的一项重要措施.方法:在医院建设中,人才是基础,医疗器械是条件,管理是关键.加强医疗设备管理是医院重点工作之一,在医疗设备管理中维修与保养则是重中之重.结果:做好医疗设备的维护保养对延长仪器寿命、提高诊断准确率起到重要作用.结论:预防性维护是指周期性地对仪器进行一系列科学的维护工作,以确保仪器安全地处于最佳工作状态.%Objective: Hospital medical equipment is the material basis of hospital modernization, and also an important symbol of the modernization. Methods: In hospital construction, talent is the foundation, medical equipment is the condition, management is the key. Strengthen the management of medical equipment is a focal point of the work of the hospital. In the management of medical equipment, repair and maintenance is very important. Results: The maintenance plays an important role in extending equipment life and improving the accuracy of diagnosis. Conclusion: Preventive maintenance is a series of scientific maintenance work for equipments, to ensure that the apparatus securely in the best working condition. This series of maintenance work mainly includes the operating performance test and adjustment, electrical safety testing, cleaning, lubricating, and replacing consumable components.

  18. Proposal for the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment with SCHNEIDER (FR) for a total amount of 1 100 000 euros (1 742 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  19. Biomedical Engineering and its Relevance to Total Health Care ...

    African Journals Online (AJOL)

    Aim: To highlight the importance of biomedical engineering, with respect to the many basic amenities including adequate water supply, electricity, drugs and medical equipment necessary for the proper functioning of medical doctors which are totally lacking in most developing countries. Method: Review of biomedical ...

  20. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  1. Summer Biomedical Engineering Institute 1972

    Science.gov (United States)

    Deloatch, E. M.

    1973-01-01

    The five problems studied for biomedical applications of NASA technology are reported. The studies reported are: design modification of electrophoretic equipment, operating room environment control, hematological viscometry, handling system for iridium, and indirect blood pressure measuring device.

  2. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  3. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  4. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  5. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  6. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  7. Applications of computational intelligence in biomedical technology

    CERN Document Server

    Majernik, Jaroslav; Pancerz, Krzysztof; Zaitseva, Elena

    2016-01-01

    This book presents latest results and selected applications of Computational Intelligence in Biomedical Technologies. Most of contributions deal with problems of Biomedical and Medical Informatics, ranging from theoretical considerations to practical applications. Various aspects of development methods and algorithms in Biomedical and Medical Informatics as well as Algorithms for medical image processing, modeling methods are discussed. Individual contributions also cover medical decision making support, estimation of risks of treatments, reliability of medical systems, problems of practical clinical applications and many other topics  This book is intended for scientists interested in problems of Biomedical Technologies, for researchers and academic staff, for all dealing with Biomedical and Medical Informatics, as well as PhD students. Useful information is offered also to IT companies, developers of equipment and/or software for medicine and medical professionals.  .

  8. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2003-12-01

    Development of radiation monitoring equipment could be the base of domestic development of RMS. And the technique could be adapted to development of other radiation equipment of KAERI as well as hospitals and nuclear power plants. The RMS technology could be adapted to the development of precision instruments related to nuclear radiation and be the base of fundamental technology such as protein structure analysis of bio technology, development of nano advanced material and aircraft material. The technology of multi-channel readout ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  9. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  10. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  11. Good practices for effective maintenance to manage aging at NPPs

    International Nuclear Information System (INIS)

    Scott, W.B.; Enderlin, W.I.; Levy, I.S.

    1989-01-01

    The Nuclear Regulatory Commission's Office of Nuclear Regulatory Research is sponsoring this effort to study maintenance as it relates to aging, under the Nuclear Plant Aging Research (NPAR). Maintenance is the primary means of combating and correcting the effects of aging degradation at nuclear power plants. Maintenance effectiveness directly affects the safety of nuclear power plants. Several recent plant events have shown that improper maintenance or a lack of maintenance can be a significant contributory cause of plant incidents (e.g., transients at Rancho Seco and Davis Besse, and the Salem anticipated transient without scram event). In these, and other events, safety related plant equipment functions have been impaired by poor maintenance practices or a lack of maintenance on the specific equipment or in ancillary equipment that affects the ability of the safety related equipment to function. In some cases, the ancillary equipment has been nonsafety-related equipment, or balance-of-plant equipment that has not received adequate maintenance attention. In addition to the potential for causing safety significant plant transients, poor or lacking maintenance may allow the licensing basis of the plant to be eroded without detection. In some cases, time-related aging degradation of equipment that has not been detected, corrected or managed by the maintenance program has been a significant contributory factor. The NPAR program has developed significant information on aging degradation, detection, mitigation, and correction practices for safety-significant structures, systems and components that can be factored into maintenance programs and their effectiveness

  12. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  13. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  14. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1998-01-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  15. Remote maintenance development for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Shibanuma, Kiyoshi

    1998-04-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  16. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  17. Development of radiation-hard electric connector with ball bearing for in-vessel remote maintenance equipment of ITER

    International Nuclear Information System (INIS)

    Ito, Akira; Obara, Kenjiro; Tada, Eisuke; Morita, Yousuke; Yagi, Toshiaki; Iida, Kazuhisa; Sato, Masaru.

    1997-12-01

    Development of radiation-hard electric connector with ball bearing for in-vessel remote maintenance equipment of ITER (International Thermonuclear Experimental Reactor) has been conducted. Since the in-vessel remote maintenance equipment is operated under the condition of 10 6 R/h gamma ray dose rate, the electric connector has to be radiation hard for an accumulation dose of 10 10 R. In addition, the simple attachment/removal mechanism is essential for remote operation. For this, the alumina (Al203) ceramics and a ball bearing were adopted to electric insulator and plug (male) of connector, respectively. The handling tests on attachment/removal of the connector were conducted by using master slave manipulator and general purpose robot with handling tool, and as a result, the validity of the attachment/removal mechanism was verified. In the gamma ray irradiation tests, which are under way, no degradation in break down voltage (1000V 1min.) up to 10 10 R was confirmed. However insulation resistance and contact resistance between contact pin and contact socket were deteriorated in proportion to the accumulation dose. Increase of contact resistance is considered due to an erosion of contact pin. (author)

  18. Visual simulation study of equipment maintenance in dangerous environment

    International Nuclear Information System (INIS)

    Zhu Bo; Yang Yanhua; Li Shiting

    2010-01-01

    The maintenance characteristics in dangerous environments are analyzed, and the application characteristics of visualized maintenance technology are introduced. The interactive method to implement maintenance simulation is presented using EON simulation platform. Then an interacted Virtual Maintenance Training System (VMTS) is further developed, and the composition and function are described in details. The VMTS can be used in extensive array of application scopes, and it is well compatible to the hardware of virtual reality. (author)

  19. BWR Services maintenance training program

    International Nuclear Information System (INIS)

    Cox, J.H.; Chittenden, W.F.

    1979-01-01

    BWR Services has implemented a five-phase program to increase plant availability and capacity factor in operating BWR's. One phase of this program is establishing a maintenance training program on NSSS equipment; the scope encompasses maintenance on both mechanical equipment and electrical control and instrumentation equipment. The program utilizes actual product line equipment for practical Hands-on training. A total of 23 formal courses will be in place by the end of 1979. The General Electric Company is making a multimillion dollar investment in facilities to support this training. These facilities are described

  20. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  1. Ex-vessel remote maintenance for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist in removing and repairing such components as diagnostic modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the plasma chamber includes a bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid-radiation-waste-handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design were addressed in fiscal year (FY) 1987, including conceptual designs of manipulator systems, the start of a remote equipment research and development (RandD) program, and definition of the hot cell, decon, and equipment repair facility requirements. R and D work included preliminary demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development (ROMD) Facility. 1 ref., 6 figs

  2. Maintenance management at the High Flux Isotope Reactor

    International Nuclear Information System (INIS)

    Farrar, M.B.

    1982-02-01

    Maintenance procedures are described for mechanical and electrical equipment; nuclear and process instrumentation; operational maintenance; equipment and systems inspections; and HFIR quality assurance

  3. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  4. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  5. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  6. Integrated software system for improving medical equipment management.

    Science.gov (United States)

    Bliznakov, Z; Pappous, G; Bliznakova, K; Pallikarakis, N

    2003-01-01

    The evolution of biomedical technology has led to an extraordinary use of medical devices in health care delivery. During the last decade, clinical engineering departments (CEDs) turned toward computerization and application of specific software systems for medical equipment management in order to improve their services and monitor outcomes. Recently, much emphasis has been given to patient safety. Through its Medical Device Directives, the European Union has required all member nations to use a vigilance system to prevent the reoccurrence of adverse events that could lead to injuries or death of patients or personnel as a result of equipment malfunction or improper use. The World Health Organization also has made this issue a high priority and has prepared a number of actions and recommendations. In the present workplace, a new integrated, Windows-oriented system is proposed, addressing all tasks of CEDs but also offering a global approach to their management needs, including vigilance. The system architecture is based on a star model, consisting of a central core module and peripheral units. Its development has been based on the integration of 3 software modules, each one addressing specific predefined tasks. The main features of this system include equipment acquisition and replacement management, inventory archiving and monitoring, follow up on scheduled maintenance, corrective maintenance, user training, data analysis, and reports. It also incorporates vigilance monitoring and information exchange for adverse events, together with a specific application for quality-control procedures. The system offers clinical engineers the ability to monitor and evaluate the quality and cost-effectiveness of the service provided by means of quality and cost indicators. Particular emphasis has been placed on the use of harmonized standards with regard to medical device nomenclature and classification. The system's practical applications have been demonstrated through a pilot

  7. Chief objectives of the development of X-ray equipment engineering in Russia

    International Nuclear Information System (INIS)

    Blinov, N.N.; Varshavskij, Yu.V.; Zelikman, M.I.

    1997-01-01

    Based on the world tendencies in the development of X-ray diagnostic instruments the main problems int he development of domestic X-ray diagnostic equipment engineering are analyzed. Variant of basic equipment for modern X-ray room for digital biomedical radiography is proposed. Tendencies int he instrumentation of X-ray diagnosis are the following ones: X-ray computerized tomograph creation, development of telecontrolled X-ray computerized. complexes for biomedical X-ray complexes for digital biomedical radiography, automation of the film development

  8. Study on compact design of remote handling equipment for ITER blanket maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi

    2006-03-01

    In the ITER, the neutrons created by D-T reactions activate structural materials, and thereby, the circumstance in the vacuum vessel is under intense gamma radiation field. Thus, the in-vessel components such as blanket are handled and replaced by remote handling equipment. The objective of this report is to study the compactness of the remote handling equipment (a vehicle/manipulator) for the ITER blanket maintenance. In order to avoid the interferences between the blanket and the equipment during blanket replacement in the restricted vacuum vessel, a compact design of the equipment is required. Therefore, the compact design is performed, including kinematic analyses aiming at the reduction of the sizes of the vehicle equipped with a manipulator handling the blanket and the rail for the vehicle traveling in the vacuum vessel. Major results are as follows: 1. The compact vehicle/manipulator is designed concentration on the reduction of the rail size and simplification of the guide roller mechanism as well as the reduction of the gear diameter for vehicle rotation around the rail. Height of the rail is reduced from 500 mm to 400 mm by a parameter survey for weight, stiffness and stress of the rail. The roller mechanism is divided into two simple functional mechanisms composed of rollers and a pad, that is, the rollers support relatively light loads during rail deployment and vehicle traveling while a pad supports heavy loads during blanket replacement. Regarding the rotation mechanism, the double helical gear is adopted, because it has higher contact ratio than the normal spur gear and consequently can transfer higher force. The smaller double helical gear, 996 mm in diameter, can achieve 26% higher output torque, 123.5 kN·m, than that of the original spur gear of 1,460 mm in diameter, 98 kN·m. As a result, the manipulator becomes about 30% lighter, 8 tons, than the original weight, 11.2 tons. 2. Based on the compact design of the vehicle/manipulator, the

  9. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  10. Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Gee Wook; Kim, Bum Shin; Choi, Woo Song; Park, Myung Soo [KEPCO Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (Pof) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RB I is to identify important failure modes and causes in the equipment. Once these are defined, the Pof and COF can be assessed for each failure. During Pof and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the Pof is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.

  11. Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants

    International Nuclear Information System (INIS)

    Song, Gee Wook; Kim, Bum Shin; Choi, Woo Song; Park, Myung Soo

    2013-01-01

    Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (Pof) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RB I is to identify important failure modes and causes in the equipment. Once these are defined, the Pof and COF can be assessed for each failure. During Pof and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the Pof is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided

  12. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  13. Maintenance concept development for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.

    1988-01-01

    The Compact Ignition Tokamak (CIT), located at the Princeton Plasma Physics Laboratory, will be the next major experimental machine in the US Fusion Program. Its use of deuterium-tritium (D-T) fuel requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist of removing and repairing such components as diagnostic equipment modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the vacuum vessel includes both bridge-mounted and floor-mounted manipulator systems. Additionally, decontamination (decon) equipment, hot cell repair facilities, and equipment for handling and packaging solid radioactive waste (rad-waste) are being developed. Recent design activities have focused on establishing maintenance system interfaces with the facility design, developing manipulator system requirements, and using mock-ups to support the tokamak configuration design. 3 refs., 8 figs

  14. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  15. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  16. Review of spectral imaging technology in biomedical engineering: achievements and challenges.

    Science.gov (United States)

    Li, Qingli; He, Xiaofu; Wang, Yiting; Liu, Hongying; Xu, Dongrong; Guo, Fangmin

    2013-10-01

    Spectral imaging is a technology that integrates conventional imaging and spectroscopy to get both spatial and spectral information from an object. Although this technology was originally developed for remote sensing, it has been extended to the biomedical engineering field as a powerful analytical tool for biological and biomedical research. This review introduces the basics of spectral imaging, imaging methods, current equipment, and recent advances in biomedical applications. The performance and analytical capabilities of spectral imaging systems for biological and biomedical imaging are discussed. In particular, the current achievements and limitations of this technology in biomedical engineering are presented. The benefits and development trends of biomedical spectral imaging are highlighted to provide the reader with an insight into the current technological advances and its potential for biomedical research.

  17. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  18. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  19. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyeon; Hong, Suk Bong; Moon, Je Sun; Choi, Myeong Jin; Kim, Seung Bok; Kim, Jeong Bok

    1994-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have imposed the maintainability of instruments to use effectively. 15 tabs., 14 figs., 14 refs. (Author) .new

  20. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kwang Soo; Chung, Chong Eun; Park, Kwang Hyeon; Hong, Suk Boong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jung Bok

    1996-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. (author). 10 refs., 18 tabs., 8 figs.

  1. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Chung, Chong Eun; Park, Kwang Hyeon; Hong, Suk Boong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jung Bok.

    1996-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. (author). 10 refs., 18 tabs., 8 figs

  2. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyun; Hong, Suk Bong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jeong Bok

    1995-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. 18 tabs., 17 figs., 13 refs. (Author) .new

  3. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyun; Hong, Suk Bong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jeong Bok [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. 18 tabs., 17 figs., 13 refs. (Author) .new.

  4. Equipment improvements for performance enhancement

    International Nuclear Information System (INIS)

    Gaestel, P.; Guesnon, H.; Sauze, G.

    1994-01-01

    In order to enhance the reactor availability, several improvements on reactor equipment have been developed: design optimization for stator maintenance replacement in the main alternator; adjustment modification of stator coils in the main alternator for an easier maintenance; improvement of the fuel handling line (pole crane, transfer equipment, loading machine); development of a loose part trapping system in the steam generator secondary circuit. 1 tab

  5. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  6. Development of augmented reality system for servicing electromechanical equipment

    Science.gov (United States)

    Zhukovskiy, Y.; Koteleva, N.

    2018-05-01

    Electromechanical equipment is widely used. It is used in industrial enterprises, in the spheres of public services, in everyday life, etc. Maintenance servicing of electromechanical equipment is an important part of its life cycle. High-quality and timely service can extend the life of the electromechanical equipment. The creation of special systems that simplify the process of servicing electromechanical equipment is an urgent task. Such systems can shorten the time for maintenance of electrical equipment, and, therefore, reduce the cost of maintenance in general. This article presents an analysis of information on the operation of service services for maintenance and repair of electromechanical equipment, identifies the list of services, and estimates the time required to perform basic service operations. The structure of the augmented reality system is presented, the ways of interaction of the augmented reality system with the automated control systems working at the enterprise are presented.

  7. Maintenence and fabrication of Electronic Equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Young Keun; Kim, Jung Bok; Lee, Sang Suk

    2004-12-01

    Development of the SPND Monitor could be the base of development of small signal processing circuits and the technique could be used to develop other precision equipment. The repair technology for high purity germanium(HPGe) detector system could be adapted to other areas where high purity detectors are used such as hospitals, universities etc. The technology of multi-channel ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  8. A natural fit: home healthcare and biomedical engineering.

    Science.gov (United States)

    Damasco, Nestor; Abe, Chris

    2010-01-01

    The involvement of Biomed in management of home care equipment has become a natural fit for Rady Children's Hospital. Managing all aspects of home care equipment through an in-house biomedical engineering department is cost-effective, efficient, provides excellent customer service, and enhances the relationship with the clinical staff and patients. It develops a sense of security for patients and staff that home care equipment is tested and maintained in a stringent manner that promotes safety.

  9. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  10. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  11. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  12. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  13. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  14. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  15. Remote-automation of nuclear power plant equipment inspection and maintenance

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi; Kawamura, Hironobu; Nakano, Yoshiyuki; Izumi, Shigeru.

    1984-01-01

    The remotely operated automation of the checkup and maintenance of nuclear power generation facilities has largely contributed to the rise of capacity ratio of plants due to the shortening of regular inspection period and to the reduction of radiation exposure dose during working, the labor saving in working and so on. In this paper, the new technologies adopted in an automatic fuel exchanger, a remotely operated automatic CRD exchanger, a new type channel handling machine, pressure-withstanding main steam line plugs and so on for No.2 plant in the Fukushima No.2 Nuclear Power Station, Tokyo Electric Power Co., Inc., are reported. Besides, the state of development of new remotely operated automatic machines for nuclear power use, such as CRD disassembling and cleaning device, volume reduction equipment for spent fuel channel boxes and control rods, multi-functional robots for use under high radiation and so on is described. Also the trend of development of latest robot technology which will be put in practical use in near future is outlined, such as a running manipulator for checkup and inspection, a variable form crawler vehicle and a five-leg movable manipulator. (Kako, I.)

  16. COSWIN Logiciel de Maintenance des Equipements de Levage

    CERN Document Server

    Langer, B

    1999-01-01

    La section 'Maintenance d'équipements de levage' assure l'entretien préventif et correctif d'un parc de 2800 appareils de levage et de manutention. Cette tâche est effectuée en collaboration avec une entreprise, spécialisée dans la maintenance industrielle. Pour faciliter la gestion des interventions, la section ST-HM-PR dispose depuis 1985 d'un système de gestion de maintenance assistée par ordinateur (GMAO). En 1996, cet ancien système a été remplacé par le logiciel 'COSWIN'. Celui-ci correspond aux besoins de la maintenance des appareils de levage. Sa disponibilité sous la plate-forme 'WINDOWS' rend l'utilisation de la GMAO facile et conviviale. 'COSWIN' travaillant en réseau, la base de données est commune pour tous les utilisateurs et mise à jour en temps réel. Depuis leurs locaux, situés au Technoparc de St. Genis, les opérateurs de l'entreprise contractante ont accès au logiciel par une ligne téléphonique. Le contrôle et le suivi des performances de l'entreprise se fait par l'ana...

  17. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  18. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    International Nuclear Information System (INIS)

    Husler, R.O.; Weir, T.J.

    1991-01-01

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I ampersand C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified to include process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility

  19. Fault Detection for Large-Scale Railway Maintenance Equipment Base on Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Junfu Yu

    2014-04-01

    Full Text Available Focusing on the fault detection application for large-scale railway maintenance equipment with the specialties of low-cost, energy efficiency, collecting data of the function units. This paper proposed energy efficiency, convenient installation fault detection application using Sigsbee wireless sensor networks, which Sigsbee is the most widely used protocol based on IEEE 802.15.4. This paper proposed a systematic application from hardware design using STM32F103 chips as processer, to software system. Fault detection application is the basic part of the fault diagnose system, wireless sensor nodes of the fault detection application with different kinds of sensors for verities function units communication by Sigsbee to collecting and sending basic working status data to the home gateway, then data will be sent to the fault diagnose system.

  20. Measuring the performance of maintenance service outsourcing.

    Science.gov (United States)

    Cruz, Antonio Miguel; Rincon, Adriana Maria Rios; Haugan, Gregory L

    2013-01-01

    The aims of this paper are (1) to identify the characteristics of maintenance service providers that directly impact maintenance service quality, using 18 independent covariables; (2) to quantify the change in risk these covariables present to service quality, measured in terms of equipment turnaround time (TAT). A survey was applied to every maintenance service provider (n = 19) for characterization purposes. The equipment inventory was characterized, and the TAT variable recorded and monitored for every work order of each service provider (N = 1,025). Finally, the research team conducted a statistical analysis to accomplish the research objectives. The results of this study offer strong empirical evidence that the most influential variables affecting the quality of maintenance service performance are the following: type of maintenance, availability of spare parts in the country, user training, technological complexity of the equipment, distance between the company and the hospital, and the number of maintenance visits performed by the company. The strength of the results obtained by the Cox model built are supported by the measure of the Rp,e(2) = 0.57 with a value of Rp,e= 0.75. Thus, the model explained 57% of the variation in equipment TAT, with moderate high positive correlation between the dependent variable (TAT) and independent variables.

  1. Biomedical engineering for health research and development.

    Science.gov (United States)

    Zhang, X-Y

    2015-01-01

    Biomedical engineering is a new area of research in medicine and biology, providing new concepts and designs for the diagnosis, treatment and prevention of various diseases. There are several types of biomedical engineering, such as tissue, genetic, neural and stem cells, as well as chemical and clinical engineering for health care. Many electronic and magnetic methods and equipments are used for the biomedical engineering such as Computed Tomography (CT) scans, Magnetic Resonance Imaging (MRI) scans, Electroencephalography (EEG), Ultrasound and regenerative medicine and stem cell cultures, preparations of artificial cells and organs, such as pancreas, urinary bladders, liver cells, and fibroblasts cells of foreskin and others. The principle of tissue engineering is described with various types of cells used for tissue engineering purposes. The use of several medical devices and bionics are mentioned with scaffold, cells and tissue cultures and various materials are used for biomedical engineering. The use of biomedical engineering methods is very important for the human health, and research and development of diseases. The bioreactors and preparations of artificial cells or tissues and organs are described here.

  2. TOTAL PRODUCTIVE MAINTENANCE, A CENTRAL PREOCCUPATION OF THE MANAGERS

    Directory of Open Access Journals (Sweden)

    Daniela POPESCU

    2013-06-01

    Full Text Available This present study demonstrates that the role of the mangers in the productive maintenance is currently becoming more important. This assessment is formulated starting from the daily realities regarding the growth of the proportions of productions and along with these the growth of the volume of equipments which need a better care and maintenance for a proper operation. The productive maintenance has developed and emerged out of this necessity. Therefore, the productive maintenance in the economic theory represents the maintenance of the equipments and fabric at the highest productive level by cooperating with all departments related to production. This aspect points out that the maintenance and repair works of the equipments have to be the main preoccupation of the personnel and especially of the managers.

  3. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Jung Bok

    1999-12-01

    Providing technical support to the maintenance and repair problems of electronic instruments, we have assisted the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the performance of the data processing system of RMS, and also modified the cyclic box using PLC which is a facility for airborne monitoring in radiation area. (author)

  4. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  5. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  6. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  7. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology to carry out maintenance operations on auxiliary machine components. These operations consist of removing and repairing components such as diagnostics and radio frequency (rf) heating modules using remotely operated maintenance equipment. The major equipment that is being developed to accomplish maintenance external to the plasma chamber includes the bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid rad-waste handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design have been addressed in fiscal year (FY) 1987. These included conceptual designs of manipulator systems, the start of a remote equipment research and development (R and D) program, and definition of the hot cell, decon, and equipment repair facility requirements. The manipulator work included investigating transporters and viewing/lighting subsystems. In each case, existing commercial units are being assessed initially, along with viable alternative approaches. R and D work also included demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development Facility

  8. The importance of maintainability in maintenance cost management

    International Nuclear Information System (INIS)

    Allen, R.R.

    1996-01-01

    This paper provides specific examples and results from ongoing projects at Power Plants, and for offshore oil platforms. The paper describes the vital role maintainability has on plant availability. How the application of equipment maintainability principles, if addressed using state of the art computer tools and advanced business processes can bring annual return on investment results as high as 15 to 1. The maintenance process of today and for the future must provide for high plant availability at the lowest possible cost. The high cost of obtaining equipment reliability levels necessary to meet required availability demands has not proved to be sustainable. Therefore new business decision processes that address equipment failures as part of the maintenance process have been developed. Repair costs require that equipment failures be selective and controlled so that a high level of safety and plant availability is assurance. This can only be accomplished by the use of advanced computer tools in the hands of well trained maintenance-engineering specialist. The relationship between Reliability Centered Maintenance (RCM), Condition Directed Planned Maintenance (CDPM), and maintainability is also presented

  9. Activities of the Service for maintenance of the RA reactor electronic equipment in 1979 - Report - Annex IV; Prilog IV Rad sluzbe za odrzavanje elektronske opreme reaktora RA u 1979. godini - Izvestaj -

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1979-12-15

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system. [Serbo-Croat] U okviru organizacione seme OOUR nuklearni reaktor RA sluzba za odrzavanje instrumentacije postrojenja ima sledece zadatke: odrzavanje postojece elektronske opreme; ucesce u planiranju eksperimenata i priprema elektronske opreme; nabavka nove opreme, rezervnih delova i komponenti; rad na izradi elektronske opreme i uredjaja za sopstvene potrebe i izrada projekata u domenu reaktorske opreme i ucesce u ugradnji nove opreme. Osnovna instrumentacija postrojenja obuhvata: sistem za upravljanje i zastitu, sistem za tehnolosku kontrolu i sistem za dozimetrijsku kontrolu.

  10. Maintenance strategies to reduce downtime due to machine positional errors

    OpenAIRE

    Shagluf, Abubaker; Longstaff, A.P.; Fletcher, S.

    2014-01-01

    Proceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014 Manufacturing strives to reduce waste and increase Overall Equipment Effectiveness (OEE). When managing machine tool maintenance a manufacturer must apply an appropriate decision technique in order to reveal hidden costs associated with production losses, reduce equipment downtime competentely and similiarly identify the machines performance. Total productive maintenance (TPM) is a maintenance progr...

  11. Failure: A Source of Progress in Maintenance and Design

    Science.gov (United States)

    Chaïb, R.; Taleb, M.; Benidir, M.; Verzea, I.; Bellaouar, A.

    This approach, allows using the failure as a source of progress in maintenance and design to detect the most critical components in equipment, to determine the priority order maintenance actions to lead and direct the exploitation procedure towards the most penalizing links in this equipment, even define the necessary changes and recommendations for future improvement. Thus, appreciate the pathological behaviour of the material and increase its availability, even increase its lifespan and improve its future design. In this context and in the light of these points, the failures are important in managing the maintenance function. Indeed, it has become important to understand the phenomena of failure and degradation of equipments in order to establish an appropriate maintenance policy for the rational use of mechanical components and move to the practice of proactive maintenance [1], do maintenance at the design [2].

  12. Remote operation and maintenance demonstration facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D.; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock up various hot cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups

  13. THE OFFICIAL AUDIT: THE MAINTENANCE OF THE STRUCTURES AND EQUIPMENTS

    Directory of Open Access Journals (Sweden)

    Claudio Biglia

    2008-12-01

    Full Text Available The author distinguishes the ordinary maintenance in corrective, preventive and predictive maintenance and describes the importance of the verifications of the maintenance procedures of the structures and the equipmentes in the food industy. He individualizes criterions to follow for an aware detective check. This approach offers a greater guarantee of food security and a greater responsibility of OSA

  14. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  15. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  16. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  17. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology for ex-vessel maintenance operations on auxiliary machine components. These operations consist of repairing and replacing components such as diagnostic, radio-frequency (rf) heating, and fueling systems using remotely operated maintenance equipment in the test cell. In addition, ex-vessel maintenance design also includes developing hot cell facilities for equipment decontamination, repair, and solid radioactive waste handling. The test cell maintenance philosophy is markedly influenced by the neutron/gamma shield surrounding the machine that allows personal access into the test cell one day after shutdown. Hence, maintenance operations can be performed hands-on in the test cell with the shield intact and must be remotely performed when the shield is disassembled for machine access. The constricted access to the auxiliary components of the machine affect the design requirements for the maintenance equipment and impose major spatial constraints. Several major areas of the maintenance system design are being addressed in fiscal year 1987. These include conceptual design of the manipulator system, preliminary remote equipment research and development, and definition of the hot cell, decontamination, and equipment repair facility requirements. The manipulator work includes investigating transporters and viewing/lighting subsystems. 2 figs

  18. Model-based fault diagnosis framework for effective predictive maintenance / B.B. Akindele

    OpenAIRE

    Akindele, Babatunde Babajide

    2010-01-01

    Predictive maintenance is a proactive maintenance strategy that is aimed at preventing the unexpected failure of equipment through condition monitoring of the health and performance of the equipment. Incessant equipment outage resulting in low availability of production facilities is a major issue in the Nigerian manufacturing environment. Improving equipment availability in Nigeria industry through institution of a full featured predictive maintenance has been suggested by many authors. T...

  19. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  20. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  1. Remote Operation and Maintenance Demonstration Facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock-up various hot-cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and the other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups. 6 figures

  2. The development of web based power plant maintenance management system

    International Nuclear Information System (INIS)

    Kim, Bum Shin; Kim, Eui Hyun; Jang, Dong Sik; Cho, Jae Min; Chae, Gil Seok; Jung, Gyu Chol

    2004-01-01

    Most power plants have operated many independent computerize systems for maintenance. Independence of systems have caused complexity of business process and inconvenience of computer system management. Because the equipment and material master data is not standardize and structurize, it is difficult to manage equipment maintenance history and material delivery. Especially equipment classification criterion is important for standardization of every maintenance information. It is necessary to integrate function of independent systems for business process simplification and rapid work flow. This paper provides equipment classification criterion design and system integration method with the case of live system development

  3. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  4. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  5. Modelo de gerenciamento da manutenção de equipamentos de radiologia convencional Maintenance management model for conventional radiology equipments

    Directory of Open Access Journals (Sweden)

    Nelson Fraga do Couto

    2003-12-01

    Full Text Available Foi elaborado um modelo de gerenciamento da manutenção dos equipamentos convencionais de raios X no Hospital Universitário Clementino Fraga Filho. O modelo foi implementado em várias etapas, que incluíram visitas a centros hospitalares que gerenciam seus equipamentos, linha de colaboração com a Fundação Oswaldo Cruz para realização de cursos e treinamento de técnicos de eletrônica do hospital, montagem de uma esquemateca dos equipamentos em uso, criação de um programa de gerenciamento utilizando um banco de dados na plataforma Microsoft Windows 98-Access, levantamento operacional e condições de funcionamento dos equipamentos. A criação de uma nova rotina nas manutenções vai ao encontro das necessidades de reduzir o tempo de atendimento, custos, e de melhoria na qualidade da imagem em um serviço de radiodiagnóstico, atendendo também às exigências da Portaria 453/98 do Ministério da Saúde.We developed a management model for maintenance of hospital radiological X-ray equipment. The model was implemented in several steps including visits to other hospitals where equipment management is also done, collaboration work with "Fundação Oswaldo Cruz" for the realization of courses and a training program for the hospital electronic technicians, organization of a small library with the schemes of the radiological equipment in use at "Hospital Universitário Clementino Fraga Filho", Rio de Janeiro, Brazil, development of a management software using a database from Access (Microsoft Windows and evaluation of the performance of the radiological equipment. The implementation of a new routine for equipment maintenance fulfils the need for reducing repair delay and costs, improving image quality in radiodiagnosis services, and complying with resolution 453/98 of the Brazilian Ministry of Health.

  6. Biomedical laboratories: architecture and radioprotection principles

    International Nuclear Information System (INIS)

    Lapa, Renata

    2005-01-01

    In institutions where biological research are made and some technologies make use of radioisotope, the radiation protection is an issue of biosecurity for conceptual reasons. In the process of architectural design of Biomedical Laboratories, engineering and architecture reveal interfaces with other areas of knowledge and specific concepts. Exploring the role of architectural design in favor of personal and environmental protection in biological containment laboratories that handle non-sealed sources in research, the work discusses the triad that compose the principle of containment in health environments: best practices, protective equipment, physical facilities, with greater emphasis on the latter component. The shortcomings of the design process are reflected in construction and in use-operation and maintenance of these buildings, with direct consequences on the occupational health and safety, environmental and credibility of work processes. In this context, the importance of adoption of alternatives to improve the design process is confirmed, taking into account the early consideration of several variables involved and providing subsidies to the related laboratories . The research, conducted at FIOCRUZ - a Brazilian health institution, developed from the analysis of the participants in the architectural project, aiming at the formulation of design guidelines which could contribute to the rationalisation of this kind of building construction

  7. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  8. Annual report of the maintenance division for 1965

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-12-01

    The personnel of the Division is organized in groups, each responsible for a number of tasks related to maintenance of reactor mechanical structures, electric equipment, electronic equipment. According to the action plan for 1965 the division for RA reactor maintenance the main activities were: planned maintenance of the reactor components, planned repair of the main components, indispensable repairs during reactor operation, repair during planned shutdown periods and tasks related to improvement of operation components and systems. Quite a significant number of failures was related to electronic equipment resulting from failures of thermometers in the heavy water system due to vibrations of the pumps. A number of spare parts and tools were produced needed for maintenance of reactor components, as well as instruments for control and calibration of reactor measuring devices [sr

  9. The maintenance management for lean organization

    Directory of Open Access Journals (Sweden)

    Daniel D. GEORGESCU

    2010-12-01

    Full Text Available The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvement program; instantaneous maintenance; improvement setup operations. In the spirit of Lean principle, Lean TPM adjusts overall equipment effectiveness concept for all supply-chain from supplier to customer. Maintaining equipment in its optimal state and continually improving its productivity is the whole strategy behind Lean TPM.

  10. Maintenance Strategies to Reduce Downtime Due to\\ud Machine Positional Errors

    OpenAIRE

    Shagluf, Abubaker; Longstaff, Andrew P.; Fletcher, Simon

    2014-01-01

    Manufacturing strives to reduce waste and increase\\ud Overall Equipment Effectiveness (OEE). When managing machine tool maintenance a manufacturer must apply an appropriate decision technique in order to reveal hidden costs associated with production losses, reduce equipment downtime\\ud competently and similarly identify the machines’ performance.\\ud Total productive maintenance (TPM) is a maintenance program that involves concepts for maintaining plant and equipment effectively. OEE is a pow...

  11. Thermoeconomic studies applied to maintenance of power plants

    International Nuclear Information System (INIS)

    Carvalho, F.R.; Horta Nogueira, L.A.

    1996-01-01

    The thermoeconomic method is an important tool aiming to improve maintenance activities in steam power plants, becoming possible to share the irreversibilities costs to each equipment, as boilers, turbines and heat exchangers. Furthermore, the effects related to changes in operational and design parameters can be studied in a detailed way, evaluating the local and distributed effects. In this work, after a brief review of power plant maintenance costs concepts and values, one address a methodology for maintenance costs estimation and develops a case study of thermoeconomics of a hypothetical plant, presenting the exergy flows, exergy losses and maintenance costs distribution. Also is presented an evaluation of exergoeconomic maintenance cost, evaluating their significance, at equipment level, related to overall maintenance cost, aiming to help the maintenance activities planning. 10 refs, 3 figs, 12 tabs

  12. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2001-12-01

    Providing technical support to the maintenance and repair problems of electronic instruments, we have assisted the research and development work, and made it done effectively in KAERI. In addition, we have improved the performance of the alarming system of the unit211 in PIEF and the lamp control module(IND100) in RWTF using PLCs. And also, electronic circuit modules for MAFF system which is an instrument for airborne monitoring in radiation area have been designed and fabricated

  13. Choice and maintenance of equipment for electron crystallography.

    Science.gov (United States)

    Mills, Deryck J; Vonck, Janet

    2013-01-01

    The choice of equipment for an electron crystallography laboratory will ultimately be determined by the available budget; nevertheless, the ideal lab will have two electron microscopes: a dedicated 300 kV cryo-EM with a field emission gun and a smaller LaB(6) machine for screening. The high-end machine should be equipped with photographic film or a very large CCD or CMOS camera for 2D crystal data collection; the screening microscope needs a mid-size CCD for rapid evaluation of crystal samples. The microscope room installations should provide adequate space and a special environment that puts no restrictions on the collection of high-resolution data. Equipment for specimen preparation includes a carbon coater, glow discharge unit, light microscope, plunge freezer, and liquid nitrogen containers and storage dewars. When photographic film is to be used, additional requirements are a film desiccator, dark room, optical diffractometer, and a film scanner. Having the electron microscopes and ancillary equipment well maintained and always in optimum condition facilitates the production of high-quality data.

  14. Object and operation supported maintenance for mining equipment

    Directory of Open Access Journals (Sweden)

    Walter Bartelmus

    2014-09-01

    Full Text Available The paper aroused in answer to discussion in Mining Magazine (MM September 2011 and July/August 2013. The paper shows that discussion given in the MM issue July/August 2013 does not fulfill expectations expressed in MM issue 2011. The presented paper is the review on maintenance that is based on condition monitoring as tool for detection of faults and failure prevention. Fault and failure are regarded as inevitable during the machine operation as the process of wear and the process of degradation. The question is, if one can influence the wear and degradation process, using condition monitoring. The paper will present technology (in reference to cited papers which demonstrates that the use of the proper method can influence the wear and machine degradation process, using proper condition monitoring techniques and knowing scenarios of wear and degradation process, the maintenance can be rationalized. The presented paper shows possible improvements which are needed to fulfill expectations expressed in MM September 2011 and they are not taken into consideration in MM July/August 3013. These improvements can be fulfilling on the bases of object and operation supported maintenance.

  15. Remote maintenance concepts for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Davis, F.C.; Hager, E.R.

    1988-01-01

    Because deuterium-tritium fuel will be used in the Compact Ignition Tokamak (CIT), remote handling technology is needed to carry out some maintenance operations on the machine. In keeping with the compact, low-cost nature of CIT, remote maintenance is provided only for systems with the highest probability of failure. Remote operations include removing, repairing (if feasible), and replacing such components as thermal protection tiles on the first wall, radio-frequency (rf) heating modules, and diagnostic modules. For maintenance inside the vacuum vessel, major pieces of equipment under development include an articulated boom manipulator with servomanipulators, an inspection manipulator, and special tooling. For maintenance outside the cryostat, remote equipment includes a bridge-mounted manipulator system, equipment for decontamination and hot cell activities, and for handling and packaging solid radioactive waste. The conceptual design phase of the CIT project is nearing completion; research and development activities in support of the project include demonstrations of remote maintenance operations on full-size partial mock-ups. 9 figs

  16. Numerical study of inventory management under various maintenance policies

    NARCIS (Netherlands)

    Poppe, J.; Basten, R.J.I.; Boute, R.N.; Lambrecht, M.R.

    2017-01-01

    Capital assets, such as manufacturing equipment, require maintenance to remain functioning. Maintenance can be performed when a component breaks down and needs replacement (i.e., corrective maintenance), or the maintenance and part replacement can be performed preventively. Preventive maintenance

  17. Exploration and Application of Standardization Management of Electrical Equipment Maintenance in Chemical Enterprises%化工企业电气设备检修标准化管理探索及应用

    Institute of Scientific and Technical Information of China (English)

    陶者青

    2016-01-01

    Discusses the current large-scale chemical enterprise electrical equipment maintenance problems,and the company electrical equipment maintenance standardization of the practice of the introduction and summary.%探讨目前大型化工企业电气设备检修存在问题,并对该公司电气设备检修标准化的实践,进行了介绍与总结。

  18. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  19. Development of Tokai reprocessing plant maintenance support system (TORMASS) in the Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Shimizu, Kazuyuki; Tomita, Tsuneo; Sakai, Katsumi

    2008-01-01

    The maintenance work of many equipments such as mechanical, electrical and instrumentations installed in Tokai reprocessing plant has been performed more then 10,000 times per year and about 90% of maintenances were preventive work. For the maintenance management, optimization of maintenance information is required. Therefore, Tokai Reprocessing Plant Maintenance Support System (TORMASS) was developed from 1985 to 1992 as the aim of construction for suitable maintenance management system. About 24,000 equipments of specifications and about 261,000 maintenance detail were registered in this system. TORMASS has been used for the repair, inspection and replacement of equipment since 1992. (author)

  20. Preventive Maintenance Optimization in Healthcare Domain: Status of Research and Perspective

    OpenAIRE

    Mahfoud, H.; El Barkany, A.; El Biyaali, A.

    2016-01-01

    Although medical equipment maintenance has been carefully managed for years, very few in-depth studies have been conducted to evaluate the effectiveness and efficiency of these implemented preventive maintenance strategies, especially after the debate about the credibility of manufacturer’s recommendations has increased in the clinical engineering community. Facing the dilemma of merely following manufactures maintenance manual or establishing an evidence-based maintenance, medical equipment ...

  1. Some aspects related to the management of maintenance for a TRIGA research reactor In Romania

    International Nuclear Information System (INIS)

    Vieru, G.

    2003-01-01

    Safety management for a nuclear research reactor involves 'good dependability management' of operations activities, such as: reliability, availability, maintainability and maintenance support. In order to evaluate the safety management aspects intended to be applied by research reactor management, the performance dependability indicators and their impact on reactor availability and reactor safety have to be established. The document ISO 9000-4/IEC 300-1 'Dependability Management' (1995), describes five internationally agreed indicators of reactor equipment dependability. Each of them can be used for corrective maintenance or for preventive maintenance, such as: I 1 - equipment Maintenance Frequency; I 2 - equipment Maintenance Effort; I 3 - equipment Maintenance Downtime Factor; I 4 - equipment Maintenance Contribution to the System Function Downtime Factor; I 5 - equipment Maintenance Contribution to the reactor Capability Loss Factor. This paper presents an evaluation of those 5 mentioned indicators with reference to the primary circuit of the INR's TRIGA research reactor and conclusion. The analyzed period was between 1994- 1999. It is to be noted that this type of analysis is performed for the first time for a research reactor. (author)

  2. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Chong Soo; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2000-12-01

    Providing technical support to the maintenance and repair problems of electronic instruments, we have assisted the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the performance of the data processing system of RMS, and modified the cyclic box and IND100 using PLCs which are a facility for airborne monitoring in radiation area and lamp control modules of radiation monitoring control panel respectively. And also, a gamma-ray densitometer for KNGR has been designed and fabricated.

  3. Human error in maintenance: An investigative study for the factories of the future

    International Nuclear Information System (INIS)

    Dhillon, B S

    2014-01-01

    This paper presents a study of human error in maintenance. Many different aspects of human error in maintenance considered useful for the factories of the future are studied, including facts, figures, and examples; occurrence of maintenance error in equipment life cycle, elements of a maintenance person's time, maintenance environment and the causes for the occurrence of maintenance error, types and typical maintenance errors, common maintainability design errors and useful design guidelines to reduce equipment maintenance errors, maintenance work instructions, and maintenance error analysis methods

  4. Maintenance considerations of the STARFIRE commercial tokamak

    International Nuclear Information System (INIS)

    Trachsel, C.A.; Zahn, H.S.; Field, R.E.; Stevens, H.C.

    1979-01-01

    This paper presents the maintenance approach, the commercial tokamak design features that enhance maintenance and preliminary repair time and required mean-time-between-failures for major subsystems. Reactor hall building and maintenance equipment requirements including hot cells, coil rewinding, and cranes are discussed

  5. Use of risk importance measures in maintenance prioritization

    International Nuclear Information System (INIS)

    Dubreil Chambardel, A.; Ardorino, F.; Mauger, P.

    1997-01-01

    A RCM method has been developed at EDF since 1990 to optimize maintenance through a prioritization of resources for equipment that are important in terms of safety, availability and maintenance costs. In 1994, the Nuclear Power Plant Operations Division decided to apply this method to the most important systems of the French PWRs. About 50 systems are in the scope of the RCM. Those that have a role in safety were ranked depending on their contribution to the risk of core melt provided by PSAs. The RCM studies on the 20 most important to safety systems are performed by the Nuclear Power Plant Operations division, the other 30 systems are studied on sites. The RCM study consists first in the research of equipment and failures modes significant to safety, availability or maintenance costs and the evaluation of the performance of those equipment. Those studies lead to the distinction of equipment and failure modes that are critical or non critical to safety, availability and costs. The last part of the study consists in optimizing maintenance on those equipment. In this process, risk measures are used to help defining equipment and failure modes critical to safety. This is done by calculation of risk importance measures provided by PSAs. We explain in this paper which measures of risk have been defined, how PSAs allow calculation of those measures, and how we used those results in the RCM studies we processed. We give also extensions of the use of those measures in the process of defining optimized maintenance tasks. After having defined a RCM method for the French PWRs, the Nuclear Power plant Operations Division decided to start a generalized program of maintenance optimization for the most important systems. The three criteria on which the method relies are: safety, unit availability and maintenance costs. We present here the safety aspect of the method and more precisely these of risk importance measures in the RCM process. (author)

  6. Biomedical waste management in Ayurveda hospitals - current practices & future prospectives.

    Science.gov (United States)

    Rajan, Renju; Robin, Delvin T; M, Vandanarani

    2018-03-16

    Biomedical waste management is an integral part of traditional and contemporary system of health care. The paper focuses on the identification and classification of biomedical wastes in Ayurvedic hospitals, current practices of its management in Ayurveda hospitals and its future prospective. Databases like PubMed (1975-2017 Feb), Scopus (1960-2017), AYUSH Portal, DOAJ, DHARA and Google scholar were searched. We used the medical subject headings 'biomedical waste' and 'health care waste' for identification and classification. The terms 'biomedical waste management', 'health care waste management' alone and combined with 'Ayurveda' or 'Ayurvedic' for current practices and recent advances in the treatment of these wastes were used. We made a humble attempt to categorize the biomedical wastes from Ayurvedic hospitals as the available data about its grouping is very scarce. Proper biomedical waste management is the mainstay of hospital cleanliness, hospital hygiene and maintenance activities. Current disposal techniques adopted for Ayurveda biomedical wastes are - sewage/drains, incineration and land fill. But these methods are having some merits as well as demerits. Our review has identified a number of interesting areas for future research such as the logical application of bioremediation techniques in biomedical waste management and the usage of effective micro-organisms and solar energy in waste disposal. Copyright © 2017 Transdisciplinary University, Bangalore and World Ayurveda Foundation. Published by Elsevier B.V. All rights reserved.

  7. Electrical predictive maintenance at Trillo I Nuclear Power Plant

    International Nuclear Information System (INIS)

    Vicente, L. R.; Fernandez de la Mata, R.; Cano Gonzalez, J. C.

    1998-01-01

    An electrical predictive maintenance plan is currently being put into effect at Trillo I Nuclear Power Plant which is initially being applied to three types of equipment: motors, transformers and motor-driven valves. This paper describes the different phases considered in the implementation of the Predictive Maintenance Plan: study of existing techniques for such equipment (tangoδ, spectral analysis of stator current, chromatographic analysis of gases, spectral analysis of the axial stray magnetic flux, etc), study of the special characteristics of the electrical equipment at Trillo NPP, analysis of applicable techniques (characteristic parameters, alert-alarm values, experience with such techniques, etc), analysis of machine history records, study of the optimum preventive-predictive case, study of applicable frequencies and definition of the computerised predictive maintenance management tool. With the exception of the computerised predictive maintenance management applications which are presently being implemented, all the activities described above have been carried out on the three types of equipment mentioned. (Author)

  8. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  9. Assessing the practice of biomedical ontology evaluation: Gaps and opportunities.

    Science.gov (United States)

    Amith, Muhammad; He, Zhe; Bian, Jiang; Lossio-Ventura, Juan Antonio; Tao, Cui

    2018-04-01

    With the proliferation of heterogeneous health care data in the last three decades, biomedical ontologies and controlled biomedical terminologies play a more and more important role in knowledge representation and management, data integration, natural language processing, as well as decision support for health information systems and biomedical research. Biomedical ontologies and controlled terminologies are intended to assure interoperability. Nevertheless, the quality of biomedical ontologies has hindered their applicability and subsequent adoption in real-world applications. Ontology evaluation is an integral part of ontology development and maintenance. In the biomedicine domain, ontology evaluation is often conducted by third parties as a quality assurance (or auditing) effort that focuses on identifying modeling errors and inconsistencies. In this work, we first organized four categorical schemes of ontology evaluation methods in the existing literature to create an integrated taxonomy. Further, to understand the ontology evaluation practice in the biomedicine domain, we reviewed a sample of 200 ontologies from the National Center for Biomedical Ontology (NCBO) BioPortal-the largest repository for biomedical ontologies-and observed that only 15 of these ontologies have documented evaluation in their corresponding inception papers. We then surveyed the recent quality assurance approaches for biomedical ontologies and their use. We also mapped these quality assurance approaches to the ontology evaluation criteria. It is our anticipation that ontology evaluation and quality assurance approaches will be more widely adopted in the development life cycle of biomedical ontologies. Copyright © 2018 Elsevier Inc. All rights reserved.

  10. Optimization of maintenance periodicity of complex of NPP safety systems

    International Nuclear Information System (INIS)

    Kolykhanov, V.; Skalozubov, V.; Kovrigkin, Y.

    2006-01-01

    The analysis of the positive and negative aspects connected to maintenance of the safety systems equipment which basically is in a standby state is executed. Tests of systems provide elimination of the latent failures and raise their reliability. Poor quality of carrying out the tests can be a source of the subsequent failures. Therefore excess frequency of tests can result in reducing reliability of safety systems. The method of optimization of maintenance periodicity of the equipment taking into account factors of its reliability and restoration procedures quality is submitted. The unavailability factor is used as a criterion of optimization of maintenance periodicity. It is offered to use parameters of reliability of the equipment and each of safety systems of NPPs received at developing PSA. And it is offered to carry out the concordance of maintenance periodicity of systems within the NPP maintenance program taking into account a significance factor of the system received on the basis of the contribution of system in CDF. Basing on the submitted method the small computer code is developed. This code allows to calculate reliability factors of a separate safety system and to determine optimum maintenance periodicity of its equipment. Optimization of maintenance periodicity of a complex of safety systems is stipulated also. As an example results of optimization of maintenance periodicity at Zaporizhzhya NPP are presented. (author)

  11. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  12. Conference on medical physics and biomedical engineering

    International Nuclear Information System (INIS)

    2013-01-01

    Due to the rapid technological development in the world today, the role of physics in modern medicine is of great importance. The frequent use of equipment that produces ionizing radiation further increases the need for radiation protection, complicated equipment requires technical support, the diagnostic and therapeutic methods impose the highest professionals in the field of medical physics. Thus, medical physics and biomedical engineering have become an inseparable part of everyday medical practice. There are a certain number of highly qualified and dedicated professionals in medical physics in Macedonia who committed themselves to work towards resolving medical physics issues. In 2000 they established the first and still only professional Association for Medical Physics and Biomedical Engineering (AMPBE) in Macedonia; a one competent to cope with problems in the fields of medicine, which applies methods of physics and biomedical engineering to medical procedures in order to develop tools essential to the physicians that will ultimately lead to improve the quality of medical practice in general. The First National Conference on Medical Physics and Biomedical Engineering was organized by the AMPBE in 2007. The idea was to gather all the professionals working in medical physics and biomedical engineering in one place in order to present their work and increase the collaboration among them. Other involved professions such as medical doctors, radiation technologists, engineers and professors of physics at the University also took part and contributed to the success of the conference. As a result, the Proceedings were published in Macedonian, with summaries in English. In order to further promote the medical physics amongst the scientific community in Macedonia, our society decided to organize The Second Conference on Medical Physics and Biomedical Engineering in November 2010. Unlike the first, this one was with international participation. This was very suitable

  13. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  14. Double-Shell Tank (DST) Maintenance and Recovery Subsystem Definition Report

    International Nuclear Information System (INIS)

    SMITH, E.A.

    2000-01-01

    The description of the Double-Shell Tank (DST) Maintenance and Recovery Subsystem presented in this document was developed to establish its boundaries. The DST Maintenance and Recovery Subsystem consists of new and existing equipment and facilities used to provide tank farm operators logistic support and problem resolution for the DST System during operations. This support will include evaluating equipment status, performing preventive and corrective maintenance, developing work packages, managing spares and consumables, supplying tooling, and training maintenance and operations personnel

  15. Application of Bayesian statistical decision theory for a maintenance optimization problem

    International Nuclear Information System (INIS)

    Procaccia, H.; Cordier, R.; Muller, S.

    1997-01-01

    Reliability-centered maintenance (RCM) is a rational approach that can be used to identify the equipment of facilities that may turn out to be critical with respect to safety, to availability, or to maintenance costs. Is is dor these critical pieces of equipment alone that a corrective (one waits for a failure) or preventive (the type and frequency are specified) maintenance policy is established. But this approach has limitations: - when there is little operating feedback and it concerns rare events affecting a piece of equipment judged critical on a priori grounds (how is it possible, in this case, to decide whether or not it is critical, since there is conflict between the gravity of the potential failure and its frequency?); - when the aim is propose an optimal maintenance frequency for a critical piece of equipment - changing the maintenance frequency hitherto applied may cause a significant drift in the observed reliability of the equipment, an aspect not generally taken into account in the RCM approach. In these two situations, expert judgments can be combined with the available operating feedback (Bayesian approach) and the combination of risk of failure and economic consequences taken into account (statistical decision theory) to achieve a true optimization of maintenance policy choices. This paper presents an application on the maintenance of diesel generator component

  16. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  17. Fast Flux Test Facility (FFTF) maintenance provisions

    International Nuclear Information System (INIS)

    Marshall, J.L.

    1981-05-01

    The Fast Flux Test Facility (FFTF) was designed with maintainability as a primary parameter, and facilities and provisions were designed into the plant to accommodate the maintenance function. This paper describes the FFTF and its systems. Special maintenance equipment and facilities for performing maintenance on radioactive components are discussed. Maintenance provisions designed into the plant to enhance maintainability are also described

  18. Policy for equipment’s leasing period extension with minimum cost of maintenance

    Science.gov (United States)

    Lestari, C.; Kurniati, N.

    2018-04-01

    The cost structure for equipment investment including purchase cost and maintenance cost is getting more expensive. The company considers to lease the equipment instead of purchase it under a contractual agreement. Offering to extend the lease period, following to the base lease period, will provide more benefits for both the lessor (owner) and the lessee (user). Whenever the lease period extension offered at the beginning of the contract, there are some risks in finance e.g. uncertainty of the equipment performance and lessor responsibility. Therefore, this research attempts to model the optimal maintenance policy for lease period extension offered at the end of the contract. Minimal repair is performed to rectify a failed equipment, while imperfect preventive maintenance is conducted to improve the operational state of the equipment when reaches a certain control limit to avoid failures. The mathematical model is constructed to determine the optimal control limit, the number and degree of preventive maintenance, and the multiplication number of the lease period extension. Finally, numerical examples are given to illustrate the influences of the optimal length of the extended lease and the maintenance policy to minimize the maintenance cost.

  19. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  20. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  1. Analyse of Maintenance Cost in ST

    CERN Document Server

    Jenssen, B W

    2001-01-01

    An analyse has been carried out in ST concerning the total costs for the division. Even though the target was the maintenance costs in ST, the global budget over has been analysed. This has been done since there is close relation between investments & consolidation and the required level for maintenance. The purpose of the analyse was to focus on maintenance cost in ST as a ratio of total maintenance costs over the replacement value of the equipment, and to make some comparisons with other industries and laboratories. Families of equipment have been defined and their corresponding ratios calculated. This first approach gives us some "quantitative" measurements. This analyse should be combined with performance indicators (more "qualitative" measurements) that are telling us how well we are performing. This will help us in defending our budget, make better priorities, and we will satisfy the requirements from our external auditors.

  2. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  3. Safety and maintenance engineering: A compilation

    Science.gov (United States)

    1974-01-01

    A compilation is presented for the dissemination of information on technological developments which have potential utility outside the aerospace and nuclear communities. Safety of personnel engaged in the handling of hazardous materials and equipment, protection of equipment from fire, high wind, or careless handling by personnel, and techniques for the maintenance of operating equipment are reported.

  4. ITER assembly and maintenance

    International Nuclear Information System (INIS)

    Honda, T.; Davis, F.; Lousteau, D.

    1991-01-01

    This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

  5. Using systematic aging assessments to improve effectiveness of plant maintenance programs

    International Nuclear Information System (INIS)

    Watson, P.; Yang, J.X.; Dam, R.F.; Nickerson, J.H.

    2003-01-01

    Nuclear plant equipment aging assessment studies provided by AECL include life assessments, condition assessments or systematic assessments of maintenance. AECL has developed several tools to apply the results of aging assessment studies to improve the effectiveness of actual plant maintenance programs. The Systematic Assessment of Maintenance and the SYSTMS tool generate maintenance tasks for a system. The System Maintenance Datastore tool assesses the maintenance resources on a system basis, and can thus quantify the savings realized by optimizing the maintenance program. Long term trends in condition-based maintenance due to component aging can be predicted, and resource savings due to optimum timing of component replacement or general plant refurbishment can be quantified. The System based Adaptive Maintenance Process ensures the maintenance program is continually updated to reflect the latest plant equipment condition and maintenance strategy information. (author)

  6. Mathematical thinking of maintenance. Problem setting and solving bases

    International Nuclear Information System (INIS)

    2007-01-01

    Plant or mechanical facility for maintenance became more complicated than before and consisted of many subsystems made of various equipments or facilities with parts, which were a system having complicated and hierarchical structure. Maintenance was required to be properly implemented to assure reliability of a system for a long period so as for each equipment to play a specified role for a stable operation of plant. Mathematical thinking using probability theory was rational to optimize maintenance action with failure rate function of system or part of equipment. Reliability function, maintainability function and availability of plant and equipment were defined. Unreliability function was called failure time distribution function (F(t)) and failure rate function (λ(t)) was defined as the ratio of failure time density distribution function (dF(t)/dt) to reliability function (1-F(t)). λ(t) could be expressed as a simple equation with Weibull parameter. Availability at steady state was attributed to ratio of average operating time to sum of operating time and maintenance time, i.e. MTBF/(MTBF+MTTR) where MTBF was mean time between failures and MTTR was mean time to repair. Optimization of system risk and maintenance action was encouraged using computational science simulating material degradation. (T. Tanaka)

  7. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  8. Information Technology Applications to Maintenance Management

    Institute of Scientific and Technical Information of China (English)

    Abdul Raouf S.I.

    2003-01-01

    Application of IT (Information Technology) to equipment management have not been ade-quately made. A system using Benefit Evaluation Ladder is described for evaluating the need for IT ap-plications to maintenance management. A systematic evaluation scheme for Computerized Maintenance Management System (CMMS) is presented.

  9. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  10. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  11. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  12. Coherent fiber supercontinuum laser for nonlinear biomedical imaging

    DEFF Research Database (Denmark)

    Tu, Haohua; Liu, Yuan; Liu, Xiaomin

    2012-01-01

    Nonlinear biomedical imaging has not benefited from the well-known techniques of fiber supercontinuum generation for reasons such as poor coherence (or high noise), insufficient controllability, low spectral power intensity, and inadequate portability. Fortunately, a few techniques involving...... nonlinear fiber optics and femtosecond fiber laser development have emerged to overcome these critical limitations. These techniques pave the way for conducting point-of-care nonlinear biomedical imaging by a low-maintenance cost-effective coherent fiber supercontinuum laser, which covers a broad emission...... wavelength of 350-1700 nm. A prototype of this laser has been demonstrated in label-free multimodal nonlinear imaging of cell and tissue samples.© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only....

  13. Annual report of the group for maintenance of electronic equipment; Godisnji izvestaj elektronske grupe

    Energy Technology Data Exchange (ETDEWEB)

    Popovic, B [Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1965-12-15

    Maintenance and repair of the RA reactor control and safety systems were uniformly distributed during the whole year and were done according to the annual plan. A series of repairs of he electronic equipment as well as exchange of electronic components and elec tonic tubes. The testing and calibration of control and protection circuits were done regularly according to the needs and operation state of the reactor and according to the instructions. Inspections, repairs and reconstructions well as operating characteristics of individual elements as well as complete electronic circuits during 1965 have shown da the systems of control and safety are still in good condition. Somewhat higher number of failures due to aging of electronic tubes is a regular consequence of equipment and instrumentation aging. [Serbo-Croat] Remontni radovi na opremi sistema za upravljanje i sigurnost reaktora RA ravnomerno su rasporedjeni tokom cele godine i obavljaju se prema planu remonta. Izvrsen je citav niz popravki elektronske instrumentacije, kao i zamena komponenti i elektronskih cevi. Sve kontrole ispravnosti i kalibracije lanaca za upravljanje i zastitu reaktora redovno su vrsene prema potrebi i u vezi sa radnim stanjem reaktora prema uputstvu za ove operacije. Pregledi, remonti i popravke kao i radne karakteristike pojedinih elemenata kao i kompletnih instrumentalnih kontrolnih lanaca u toku 1965. godine pokazali su da su sistemi upravljanja i sigurnosne zastite jos u dobrom stanju. Nesto veci broj kvarova usled starenja elektronskih cevi je normalna posledica starenja opreme i instrumentacije.

  14. BWR nuclear plant maintenance simulation

    International Nuclear Information System (INIS)

    Stuart, I.F.

    1985-01-01

    As early as 1977, the General Electric Company, USA, Nuclear Energy Operation was making plans to construct a maintenance-type simulator to support Training and Services. The Company's pioneering experience with control room simulators started in 1968 with the Dresden simulator and showed clearly the benefits of having such facilities for training, checkout of procedures and, in the case of maintenance, match-up of equipment or tools as needed. Since the dedication of the facility, it has proved to be an invaluable resource in the training of refuelling and servicing crews. The facility has also been extensively used as developmental and test facility for in-vessel servicing equipment and procedures. (author)

  15. The application of GIS equipment in nuclear power plant

    International Nuclear Information System (INIS)

    Ji Lin; Huang Pengbo; Chang Xin'ai

    2012-01-01

    In this paper, the advantage and disadvantage of gas insulated switchgear (GIS) in environmental adaptability, operation safety and economic benefit are analyzed. Issues concerning the manufacture, transportation, on-site installation, operation, maintenance and extension of GIS equipment are discussed. Comparing those characteristics with air insulated switchgear (AIS), GIS is characterized by better aseismic ability, less occupied area and installation process, lower fault rate, longer maintenance period, easier for extension and higher economic benefit, SF6 gas insures the operation safety and reliability of GIS equipment, modular transport and re-assembling improves the installation flexibility. Therefore, GIS equipment may be the first choice for the primary equipment of nuclear power plant. (authors)

  16. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2007-01-01

    ITER is a joint international research and development project that aims to demonstrate the scientific and technological feasibility of fusion power. As soon as the plasma operation begins using tritium, the replacement of the vacuum vessel internal components will need to be done with remote handling techniques. To accomplish these operations ITER has equipped itself with a Remote Maintenance System; this includes the Remote Handling equipment set and the Hot Cell facility. Both need to work in a cooperative way, with the aim of minimizing the machine shutdown periods and to maximize the machine availability. The ITER Remote Handling equipment set is required to be available, robust, reliable and retrievable. The machine components, to be remotely handle-able, are required to be designed simply so as to ease their maintenance. The baseline ITER Remote Handling equipment is described. The ITER Hot Cell Facility is required to provide a controlled and shielded area for the execution of repair operations (carried out using dedicated remote handling equipment) on those activated components which need to be returned to service, inside the vacuum vessel. The Hot Cell provides also the equipment and space for the processing and temporary storage of the operational and decommissioning radwaste. A conceptual ITER Hot Cell Facility is described. (orig.)

  17. Maintenance of the Hanford cone penetrometer platform during fiscal year 1999

    International Nuclear Information System (INIS)

    IWATATE, D.F.

    1998-01-01

    This SOW describes services requested of Applied Research and Associates, Inc. (ARA), as a commercial provider of cone penetrometer equipment and services, to provide routine inspection and minimum preventive maintenance on the Hanford CP Platform (CPP) during Fiscal Year 1999. This SOW specifically pertains to the maintenance of the CPP and associated support equipment and is limited in scope to routine preventive maintenance and identification of any deficiencies. ARA is the original manufacturer of the CPP and will conduct this work following the vendor-prepared maintenance schedule

  18. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2002-12-01

    Providing technical support to the maintenance and repair problems of electronic instruments, we have assisted the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have converted the localized control system of the unit211 into remote control system using computer network, and replaced the analog meter for the temperature indication of the spent fuel receiving process(unit212) with digital devices. 50 scintillators with PMTs, which have been deteriorated from aging, have been replaced with new ones that were fabricated and evaluated in our laboratory. Preamplification circuit for radiation detectors were developed and also signal processing multi-channel ASIC for the 2D array detector were developed and evaluated

  19. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  20. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  1. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  2. Characteristics and application study of AP1000 NPPs equipment reliability classification method

    International Nuclear Information System (INIS)

    Guan Gao

    2013-01-01

    AP1000 nuclear power plant applies an integrated approach to establish equipment reliability classification, which includes probabilistic risk assessment technique, maintenance rule administrative, power production reliability classification and functional equipment group bounding method, and eventually classify equipment reliability into 4 levels. This classification process and result are very different from classical RCM and streamlined RCM. It studied the characteristic of AP1000 equipment reliability classification approach, considered that equipment reliability classification should effectively support maintenance strategy development and work process control, recommended to use a combined RCM method to establish the future equipment reliability program of AP1000 nuclear power plants. (authors)

  3. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  4. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  5. [Big data, medical language and biomedical terminology systems].

    Science.gov (United States)

    Schulz, Stefan; López-García, Pablo

    2015-08-01

    A variety of rich terminology systems, such as thesauri, classifications, nomenclatures and ontologies support information and knowledge processing in health care and biomedical research. Nevertheless, human language, manifested as individually written texts, persists as the primary carrier of information, in the description of disease courses or treatment episodes in electronic medical records, and in the description of biomedical research in scientific publications. In the context of the discussion about big data in biomedicine, we hypothesize that the abstraction of the individuality of natural language utterances into structured and semantically normalized information facilitates the use of statistical data analytics to distil new knowledge out of textual data from biomedical research and clinical routine. Computerized human language technologies are constantly evolving and are increasingly ready to annotate narratives with codes from biomedical terminology. However, this depends heavily on linguistic and terminological resources. The creation and maintenance of such resources is labor-intensive. Nevertheless, it is sensible to assume that big data methods can be used to support this process. Examples include the learning of hierarchical relationships, the grouping of synonymous terms into concepts and the disambiguation of homonyms. Although clear evidence is still lacking, the combination of natural language technologies, semantic resources, and big data analytics is promising.

  6. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  7. RA Reactor operation and maintenance (I-IX), Part III, Task 3.08/04-02 Refurbishment of the electrical equipment; Pogon i odrzavanje reaktora RA (I-IX), III Deo, Zadatak 3.08/04-02 Remont elektro opreme

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V; Nikolic, M; Poznanovic, B; Rajic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume contains detailed action plan for repair of electrical equipment of the RA reactor, the list of electrical equipment parts which were either repaired or exchanged for improvement of their performance. Detailed work describing the repair and maintenance work done of the listed equipment is part of this report. Equipment related to dosimetry and control systems are included as well.

  8. 23 CFR 635.106 - Use of publicly owned equipment.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.106 Use of publicly owned equipment. (a) Publicly owned equipment should not normally compete with privately owned equipment on a project to be let to contract... publicly owned equipment is to be made available in connection with construction work to be let to contract...

  9. Maintenance of scientific instruments

    International Nuclear Information System (INIS)

    Lucero, E.

    1986-01-01

    During the last years Colombia has increased the use of nuclear techniques, instruments and equipment in ambitious health programs, as well as in research centers, industry and education; this has resulted in numerous maintenance problems. As an alternative solution IAN has established a Central Maintenance Laboratory for nuclear instruments within an International Atomic Energy Agency program for eight Latin American and nine Asian Countries. Established strategies and some results are detailed in this writing

  10. Maintenance system improvement in cast iron foundry

    Directory of Open Access Journals (Sweden)

    S. Kukla

    2011-07-01

    Full Text Available The work presents the issue of technical equipment management in an iron foundry basing on the assumptions of the TPM system (Total Productive Maintenance. Exploitation analysis of automatic casting lines has been carried out and their work’s influence on the whole production system’s functioning has been researched. Within maintenance system improvement, implementation of autonomic service and planned lines’ review have been proposed in order to minimize the time of breakdown stoppages. The SMED method was used to optimize changeover time, and the OEE (Overall Equipment Effectiveness was applied to evaluate the level of resources usage before and after implementing changes. Further, the influence of the maintenance strategy of casting devices’ efficiency on own costs of casting manufac- ture was estimated.

  11. Optimization on replacement and inspection period of plant equipment

    International Nuclear Information System (INIS)

    Takase, Kentaro; Kasai, Masao

    2004-01-01

    Rationalization of the plant maintenance is one of the main topics being investigated in Japanese nuclear power industries. Optimization of the inspection and replacement period of equipments is effective for the maintenance cost reduction. The more realistic model of the replacement policy is proposed in this study. It is based on the classical replacement policy model and its cost is estimated. Then, to consider the inspection for the maintenance, the formulation that includes the risk concept is discussed. Based on it, two variations of the combination of the inspection and the replacement are discussed and the costs are estimated. In this study the effect of the degradation of the equipment is important. The optimized maintenance policy depends on the existence of significant degradation. (author)

  12. Performance test of diamond-like carbon films for lubricating ITER blanket maintenance equipment under GPa-level high contact stress

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi

    2007-01-01

    Diamond-like carbon (DLC) coating was tested as a candidate solid lubricant for transmission gears of the maintenance equipment of the blanket of the ITER instead of an oil lubricant. The wear tests using the pin-on-disk method were performed on disks with SCM440 and SNCM420 as the base materials and coated with soft, layered, and hard DLCs. All cases satisfied the required allowable contact stress (2 GPa) and lifetime (10 4 cycles), and therefore the feasibility of the DLC coating was validated. Among the three types of DLCs, the soft DLC showed the best performance. (author)

  13. Maintenance of nuclear medicine instruments

    Energy Technology Data Exchange (ETDEWEB)

    Ambro, P

    1993-12-31

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment 1 fig., 1 tab

  14. Maintenance of nuclear medicine instruments

    International Nuclear Information System (INIS)

    Ambro, P.

    1992-01-01

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment

  15. Evolution of design concepts for remotely maintainable equipment racks

    International Nuclear Information System (INIS)

    Peishel, F.L.; Mouring, R.W.; Schrock, S.L.

    1986-01-01

    Equipment racks have been used to support process equipment in radioactive facilities for many years. Improvements in the design of these racks have evolved relatively slowly primarily as a result of limitations in the capabilities of maintenance equipment; that is, tasks could only be approached from above using bridge cranes with viewing primarily through periscopes. In recent years, however, technological advances have been made by the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) in bridge-mounted servomanipulators with onboard auxiliary hoists and television viewing systems. These advances permit full cell coverage by the manipulator arms which, in turn, allow maintenance tasks to be approached horizontally as well as from above. Maintainable equipment items can be stacked vertically on a rack because total overhead access is less important and maintenance tasks that would not have been attempted in the past can now be performed. These advances permit greater flexibility in the design and cell layout of the racks and lead to concepts that could significantly increase the availability of a facility. The evolution of rack design and a description of the alternative concepts based on present maintenance systems capabilities are presented in this paper. 13 refs., 11 figs

  16. A Proactive Aging/Asset Management Model to Optimize Equipment Maintenance Resources Over Plant Lifetime

    International Nuclear Information System (INIS)

    Meyer, Theodore A.; Perdue, Robert K.; Woodcock, Joel; Elder, G. Gary

    2002-01-01

    Experience has shown that proactive aging/asset management can best be defined as an ongoing process. Station goals directly supported by such a process include reducing Unplanned Capability Loss Factor and gaining the optimum value from maintenance and aging management budgets. An effective aging/asset management process must meet evolving and sometimes conflicting requirements for efficient and reliable nuclear power plant operation. The process should identify most likely contributors before they fail, and develop cost-effective contingencies. Current trends indicate the need for focused tools that give quantitative input to decision-making. Opposing goals, such as increasing availability while optimizing aging management budgets, must be balanced. Recognizing the importance of experience in reducing the uncertainty inherent in predicting equipment degradation rates, nuclear industry demographics suggest the need to capture existing expert knowledge in a usable form. The Proactive Aging/Asset Management Process has been developed to address these needs. The proactive approach is a process supported by tools. The process identifies goals and develops criteria - including safety, costs, and power production - that are used to prioritize systems and equipment across the plant. The process then draws upon tools to most effectively meet the plant's goals. The Proactive Aging/Asset Management Model TM is one software-enabled tool designed for mathematical optimization. Results assist a plant in developing a plant-wide plan of aging management activities. This paper describes the proactive aging/asset management process and provides an overview of the methodology that has been incorporated in a model to perform a plant-wide optimization of aging management activities. (authors)

  17. An economic-mathematical model for optimization of the electrical equipment maintenance parameters of the Bobov Dol mine power supply system

    International Nuclear Information System (INIS)

    Shishov, S.

    1990-01-01

    The model proposed helps to ground the quantitative evaluation of the maintenance parameters of the electrical equipment of the coal mine. In the process of simulation an assumption is made that no additional capital investments are needed - only the existing situation of the electric supply system is considered and the effect of the measures taken to increase its reliability. The model takes into account the annual operating expenses, the downtime costs, the power not supplied to the user due to breakdowns, the average total outage duration; the breakdowns intensity, the average time for serviceability restoration. The model is based on the statistical data from the equipment operation for a period of 3 years, as well as on the economical standards acting in this mine. The outage expenses calculations of two units of the Bobov Dol mine are presented as an illustrative example of the model testing. The model is realized as a software product written on PL-1. It can also simulate the effect of the personnel number as well as the annual reserves of spare parts of various equipment's makes. 2 tabs, 6 refs

  18. Special servicing equipment for reactor pressurized vessel stud hole and stud accessories

    International Nuclear Information System (INIS)

    Li Jianglian

    1999-01-01

    The author briefly introduces the design and manufacture of nuclear island special servicing equipment of Nuclear Power Institute of China. Maintenance process of reactor pressurized vessel (RPV) stud hold and stud accessories the special servicing equipment include RPV flange dummy, closed-circuit television (CCTV) inspection equipment, RPV stud hole expandable comb, RPV stud hole polisher, RPV stud hold thread lubricating equipment, RPV stud hole thread miller and RPV stud hole camera. It is presented how eight kinds of special servicing equipment perform the maintenance process concerning their function, structure, and characteristics, their practical use on site is also introduced

  19. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  20. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  1. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    Haenninen, S.; Laakso, K.

    1993-03-01

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  2. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  3. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  4. Mobile network maintenance (GSM)

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN mobile network infrastructure (GSM) on the 23 and 24 July from 6 p.m. to 6 a.m. in order to replace discontinued equipment and to increase the bandwidth capacity of the GSM mobile network. All CERN GSM emitters (40 units) will be moved one by one to the new infrastructure during the maintenance. The call of a user connected to an emitter at the time of its maintenance will be cut off. However, the general overlapping of the GSM radio coverage should mean that users are able immediately to call again should their call be interrupted. IT/CS/CS

  5. Standardization: using comparative maintenance costs in an economic analysis

    OpenAIRE

    Clark, Roger Nelson

    1987-01-01

    Approved for public release; distribution is unlimited This thesis investigates the use of comparative maintenance costs of functionally interchangeable equipments in similar U.S. Navy shipboard applications in an economic analysis of standardization. The economics of standardization, life-cycle costing, and the Navy 3-M System are discussed in general. An analysis of 3-M System maintenance costs for a selected equipment, diesel engines, is conducted. The potential use of comparative ma...

  6. Maintenance management during long-term stop of JRR-3

    International Nuclear Information System (INIS)

    Matsui, Yutaka; Suwa, Masayuki; Wada, Shigeru

    2016-01-01

    JRR-3 has been continuing its stop state for more than 5 years as of FY2015 after stopping the use operation of the reactor in November 2010. Different responses are required in the maintenance management for operation resumption, compared with those in normal operation. This paper introduces part of the maintenance managements that are performed during long-term stop. The water qualities of primary coolant and secondary coolant are controlled by measuring pH and conductivity, and the prevention of crevice corrosion of equipment is performed. In the management of pumps for coolant circulation, vibration measurement is performed to confirm that there are no signs of abnormality. As the management of the core structure, the bend measurement of beryllium reflector is performed to confirm that there is no hindrance to operation resumption, and the visual inspection of high burnup fuel elements is performed to confirm that abnormality has not occurred. As for the management of monitoring equipment, the equipment required in shutdown period is subjected to calibration work, and the equipment required in operation period is subjected to soundness check based on the results of cooling system operation. As the functional maintenance of the cooling system, cooling system operating test and 10-day continuous operation of the cooling system are monthly performed to confirm the soundness of equipment. In addition, the competence maintenance and capacity improvement of operators are performed through the cooling system operation and reactor simulator training. (A.O.)

  7. The Design and Implementation of Smart Monitoring System for Large-Scale Railway Maintenance Equipment Cab Based on ZigBee Wireless Sensor Network

    OpenAIRE

    Hairui Wang; Junfu Yu

    2014-01-01

    In recent years, organizations use IEEE 802.15.4 and ZigBee technology to deliver solution in variety areas including home environment monitoring. ZigBee technology has advantages on low-cost, low power consumption and self-forming. With the rapid expansion of the Internet, there is the requirement for remote monitoring large-scale railway maintenance equipment cab. This paper discusses the disadvantages of the existing smart monitoring system, and proposes a solution. A ZigBee wireless senso...

  8. Void Fraction Instrument operation and maintenance manual

    International Nuclear Information System (INIS)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01

    This Operations and Maintenance Manual (O ampersand MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document

  9. Implementation of the maintenance rule in Spain the PSA role

    International Nuclear Information System (INIS)

    Gerez, L.; Coello, A.

    2000-01-01

    The 10CFR50, 65 (Maintenance Rule) requires commercial nuclear power plant licensees to monitor the effectiveness of maintenance activities for safety important plant equipment in order to minimise the likelihood of failures and events caused by the lack of effective maintenance. (Author)

  10. Implementation of an agile maintenance mechanic assignment methodology

    Science.gov (United States)

    Jimenez, Jesus A.; Quintana, Rolando

    2000-10-01

    The objective of this research was to develop a decision support system (DSS) to study the impact of introducing new equipment into a medical apparel plant from a maintenance organizational structure perspective. This system will enable the company to determine if their capacity is sufficient to meet current maintenance challenges. The DSS contains two database sets that describe equipment and maintenance resource profiles. The equipment profile specifies data such as mean time to failures, mean time to repairs, and minimum mechanic skill level required to fix each machine group. Similarly, maintenance-resource profile reports information about the mechanic staff, such as number and type of certifications received, education level, and experience. The DSS will then use this information to minimize machine downtime by assigning the highest skilled mechanics to machines with higher complexity and product value. A modified version of the simplex method, the transportation problem, was used to perform the optimization. The DSS was built using the Visual Basic for Applications (VBA) language contained in the Microsoft Excel environment. A case study was developed from current existing data. The analysis consisted of forty-two machine groups and six mechanic categories with ten skill levels. Results showed that only 56% of the mechanic workforce was utilized. Thus, the company had available resources for meeting future maintenance requirements.

  11. Contract Service for School Maintenance

    Science.gov (United States)

    Modern Schools, 1976

    1976-01-01

    Preventive maintenance can extend useful equipment life in a school building and keep systems running more efficiently. Points to consider before selecting a comprehensive energy management package are listed. (Author/MLF)

  12. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  13. [Flexible print circuit technology application in biomedical engineering].

    Science.gov (United States)

    Jiang, Lihua; Cao, Yi; Zheng, Xiaolin

    2013-06-01

    Flexible print circuit (FPC) technology has been widely applied in variety of electric circuits with high precision due to its advantages, such as low-cost, high specific fabrication ability, and good flexibility, etc. Recently, this technology has also been used in biomedical engineering, especially in the development of microfluidic chip and microelectrode array. The high specific fabrication can help making microelectrode and other micro-structure equipment. And good flexibility allows the micro devices based on FPC technique to be easily packaged with other parts. In addition, it also reduces the damage of microelectrodes to the tissue. In this paper, the application of FPC technology in biomedical engineering is introduced. Moreover, the important parameters of FPC technique and the development trend of prosperous applications is also discussed.

  14. Remote system of data acquisition and equipment maintenance with communication door Series; Sistema remoto de aquisicao de dados e manutencao de equipamentos com portas de comunicacao Serie

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Ailton; Cabrera, Fernando [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The present work has for objective to present the Remote System of Data Acquisition and Equipment Maintenance with Communication door Series - GASYRG. The solution is based on a converter of protocol (Serial -Ethernet) and a panel that the function of commutator (switch) managed by control system assumes (SCADA). (author)

  15. Radiation protection calculations for diagnostic medical equipment

    International Nuclear Information System (INIS)

    Klueter, R.

    1992-01-01

    The standards DIN 6812 and DIN 6844 define the radiation protection requirements to be met by biomedical radiography equipment or systems for nuclear medicine. The paper explains the use of a specific computer program for radiation protection calculations. The program offers menu-controlled calculation, with free choice of the relevant nuclides. (DG) [de

  16. Ageing Management Based Maintenance at ETRR-II

    Energy Technology Data Exchange (ETDEWEB)

    Kamoon, A.; Ali, A., E-mail: akamoun2004@yahoo.com [Inshas Nuclear Research Centre, Egyptian Atomic Energy Authority (EAEA), Cairo (Egypt)

    2014-08-15

    The second research reactor of Egypt, ETRR-II, is an open pool type multi-purpose reactor of 22 MW that has been in operation since 1998. The main purposes of ETRR-II are the production of radioisotopes, personnel training, research and development. Ageing management of ETRR-II is based on the maintenance programme. This programme was planned to have a proactive maintenance strategy that mainly depends on adequate preventive and predictive maintenance. Screening of SSCs is based on safety classes, needs and quality levels. The operation condition and maintenance history are the basis to assess the level of degradation. The ultimate aim of the maintenance team is to perform adequate maintenance work only when it is really necessary. The objectives of the ageing management based maintenance are to maintain and improve equipment availability, confirm compliance with operational limits and conditions, and detect and correct any abnormal condition that might affect reactor safety. The programme also helps to detect trends in ageing so that a plan for mitigating ageing effects can be prepared and implemented. Reactor service conditions are monitored through many parameters and conditions such as conductivity and pH of coolant water, water radiochemical analysis, thermal and hydraulic parameters, a leak detection system, corrosion rate of piping, vibration level of rotating equipment and control rod drop time.

  17. Deficiency within pavement Maintenance Organization in Tanzania ...

    African Journals Online (AJOL)

    In addition, the rules and regulations of the public administrative system do not allow for an effective and efficient management of road maintenance. Lack of equipment and adequate qualified personnel in the field of road maintenance is too an added deficiency. As a consequence, Tanzania has started to put road ...

  18. DyKOSMap: A framework for mapping adaptation between biomedical knowledge organization systems.

    Science.gov (United States)

    Dos Reis, Julio Cesar; Pruski, Cédric; Da Silveira, Marcos; Reynaud-Delaître, Chantal

    2015-06-01

    Knowledge Organization Systems (KOS) and their associated mappings play a central role in several decision support systems. However, by virtue of knowledge evolution, KOS entities are modified over time, impacting mappings and potentially turning them invalid. This requires semi-automatic methods to maintain such semantic correspondences up-to-date at KOS evolution time. We define a complete and original framework based on formal heuristics that drives the adaptation of KOS mappings. Our approach takes into account the definition of established mappings, the evolution of KOS and the possible changes that can be applied to mappings. This study experimentally evaluates the proposed heuristics and the entire framework on realistic case studies borrowed from the biomedical domain, using official mappings between several biomedical KOSs. We demonstrate the overall performance of the approach over biomedical datasets of different characteristics and sizes. Our findings reveal the effectiveness in terms of precision, recall and F-measure of the suggested heuristics and methods defining the framework to adapt mappings affected by KOS evolution. The obtained results contribute and improve the quality of mappings over time. The proposed framework can adapt mappings largely automatically, facilitating thus the maintenance task. The implemented algorithms and tools support and minimize the work of users in charge of KOS mapping maintenance. Copyright © 2015 Elsevier Inc. All rights reserved.

  19. Maintenance and disassembly considerations for the Technology Demonstration Facility

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1983-01-01

    The Technology Demonstration Facility (TDF) is a tandem-mirror design concept carried out under the direction of Lawrence Livermore National Laboratory. It was conceived as a near-term device with a mission of developing engineering technology in a D-T fusion environment. Overall maintenance and component disassembly were among the responsibilities of the Fusion Engineering Design Center (FEDC). A configuration evolved that was based on the operational requirements of the components, as well as the requirements for their replacements. Component lifetime estimates were used to estimate the frequency and the number of replacements. In addition, it was determined that the need for remote handling equipment followed within 1.5 years after initial start-up, emphasizing the direct relationship between developing maintenance scenarios/equipment and the device configuration. Many of the scheduled maintenance operations were investigated to first order, and preliminary handling equipment concepts were developed

  20. Maintenance of influenza virus infectivity on the surfaces of personal protective equipment and clothing used in healthcare settings.

    Science.gov (United States)

    Sakaguchi, Hiroko; Wada, Koji; Kajioka, Jitsuo; Watanabe, Mayumi; Nakano, Ryuichi; Hirose, Tatsuko; Ohta, Hiroshi; Aizawa, Yoshiharu

    2010-11-01

    The maintenance of infectivity of influenza viruses on the surfaces of personal protective equipment and clothing is an important factor in terms of controlling viral cross-infection in the environment and preventing contact infection. The aim of this study was to determine if laboratory-grown influenza A (H1N1) virus maintained infectivity on the surfaces of personal protective equipment and clothing used in healthcare settings. Influenza A virus (0.5 mL) was deposited on the surface of a rubber glove, an N95 particulate respirator, a surgical mask made of non-woven fabric, a gown made of Dupont Tyvek, a coated wooden desk, and stainless steel. Each sample was left for 1, 8, and 24 h, and hemagglutination (HA) and 50% tissue culture infective dose (TCID(50))/mL were measured. The HA titer of this influenza A virus did not decrease in any of the materials tested even after 24 h. The infectivity of influenza A virus measured by TCID(50) was maintained for 8 h on the surface of all materials, with the exception of the rubber glove for which virus infectivity was maintained for 24 h. Our results indicate that the replacement/renewal of personal protective equipment and clothing by healthcare professionals in cases of exposure to secretions and droplets containing viruses spread by patients is an appropriate procedure to prevent cross-infection.

  1. Transmission Characteristics on Wire-Driven Links of a Bridge Transported Servo Manipulator for the ACP Equipment Maintenance

    International Nuclear Information System (INIS)

    Park, Byung Suk; Jin, Jae Hyun; Song, Tae Gil; Kim, Sung Hyun; Yoon, Ji Sup

    2004-01-01

    A bridge transported servo manipulator (BTSM) system for the advanced spent fuel conditioning process (ACP) has been developed to overcome the limitation of access, which is a drawback of mechanical master-slave manipulators (MSM) for the equipment maintenance. The servo manipulator is composed of a slave manipulator attached to the telescoping tube sets equipped with the overhead bridge installed at a hot cell and a master manipulator installed at an out-of-hot cell. Each manipulator has 7 degrees-of-freedom (DOF): a body rotation, an upper-arm tilt, a lower-arm tilt, a lower-arm rotation, a wrist pan and tilt, and a grasp motion. A wire-driven mechanism for a lower-arm rotation, a wrist pan and tilt, and a grasp motion of the manipulator has been adopted to increase the handling capacity compared to the manipulator weight and decrease the friction. The main disadvantage of the wire-driven mechanism is that if one link is in motion, other links can be affected. In this paper, the transmission characteristics among the wire-driven links have been formulated to overcome this drawback. The unexpected behaviors are confirmed by analyses of transmission characteristics as well as experiments. Also, the experimental results show that the unexpected behaviors are greatly decreased by the proposed compensation equations

  2. Current problems and perspectives of maintenance at NPPs

    International Nuclear Information System (INIS)

    Hevia Ruperez, F.; Garcia, R.; Manso Osuna, R.

    1994-01-01

    The highest levels of availability and efficiency for a plant in service, together with other, not less important, objectives such as improving plant safety, reliability and operability cannot be achieved if there is no adequate maintenance of plant systems and equipment. The combination of the large number of such system and equipment, diversity of their design, complexity of their interrelations and operation and maintenance requirements, make it difficult at times to obtain the right degree of technical and economic effectiveness. From the regulatory point of view, mention must be made of the Maintenance Rule (10/CFR/50.65) entitled ''Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants'' published on 10 July 1991 by the NRC. This Rule will come into force in the USA in 1996. This paper presents, on the one hand, a general view of the current status of NPP maintenance, enumerating the problems, difficulties and complications affecting its workability and, on the other, outlines new trends and methodologies (RAM, RCM, PRA, Remaining Lifetime Management, etc), for analysing and evaluating maintenance programmes, improving and optimizing them, and at the same time enhancing plant availability and lifetime. (Author)

  3. Maintenance for power conversion system of gas turbine high temperature reactor (GTHTR300). Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Kosugiyama, Shinichi; Takada, Shoji; Katanishi, Shoji; Yan, Xing; Takizuka, Takakazu; Kunitomi, Kazuhiko [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2002-11-01

    In order to be a suitable next generation nuclear power plant from reliable and economical points of view, it is necessary for GTHTR300 to have good maintenability and inspectability. Appropriate maintenance concept for the power conversion system of GTHTR300 consisting of a gas turbine, a compressor, a generator, a recuperator, a precooler and so on was studied based on results of the basic design of GTHTR300 in fiscal 2001. Considering degradation phenomena which could occur on each objective equipment, it is technically possible to reduce several maintenance items and extend maintenance interval for some equipment compared to those for existing LWR power plants and combined cycle fossil power plants. But owing to structural feature and installed location of each equipment, and fission product plate-out on each equipment, it became clear that some problems must be solved for making the maintenance works realistic and efficient. Solving the problems and confirming appropriateness of the proposed maintenance concept and plans will be done in coming detailing work of GTHTR300 design. (author)

  4. Some problems of maintenance regulation at Ukrainian nuclear power plants

    International Nuclear Information System (INIS)

    Koltakov, V.

    1997-01-01

    Among all the possible problems arising in a connection with provision of NPP power units safe operation, the maintenance and repair at the Ukrainian NPPs possess an important place. System of maintenance and repair at the Ukrainian NPPs is presently still traditional one, based on the former USSR' document ''Rules of the NPPs Equipment Maintenance and Repair Arrangement'' (RD.53.025.002-088). For to provide technical systems reliability and safety in an accordance with ''General Provisions on NPP Safety'' (OPB-82) (presently OPB-95 is in underway in Ukraine) nuclear operators are implementing their maintenance and repair. These procedures are obligatory conditions for NPP operation during all the life term. To implement an equipment maintenance and repair there are appropriate divisions in NPP structure envisaged such as departments, laboratories, sections, shops, etc. composing an NPP maintenance and repair service. There are also another specific enterprises engaged in such activities. (author). 2 tabs, 4 diagrams

  5. Medical equipment in government health facilities: Missed opportunities

    OpenAIRE

    Pardeshi Geeta

    2005-01-01

    BACKGROUND: The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. AIMS: (1) To identify the probl...

  6. EPRI spearheads generic PM recommendations for infrastructure equipment

    International Nuclear Information System (INIS)

    Worledge, David H.; Hinchcliffe, Glenn R.; Benak, Mark S.; Bridges, Martin

    2007-01-01

    All companies have at their core a vast amount of similar equipment that would benefit from solid preventive maintenance (PM) recommendations that are generic and easily adapted to meet operational conditions. The re-emergence of PM optimization methods like Reliability Centered Maintenance, further illustrates that companies in all industries recognize the positive influence that a well-focused maintenance program has on the corporate bottom line. The Electric Power Research Institute (EPRI) has long been a leader in providing universally adaptable maintenance solutions to meet the evolving needs of its membership. Nearly ten years ago, EPRI began developing the PM Basis Database, a one-of-a-kind repository of PM recommendations for basic infrastructure components (such as pumps, motors, valves, compressors), derived from equipment experts. EPRI has now made available this comprehensive body of knowledge to all industries. This paper will explore the origins and structure of the database, how these generic PM recommendations benefit every industry, and how they may be obtained. (author)

  7. METHODOLOGICAL FUNDAMENTALS OF DETERMINATION OF UNPOWERED ROLLING STOCK MAINTENANCE CHARACTERISTICS

    Directory of Open Access Journals (Sweden)

    L. A. Muradian

    2016-02-01

    Full Text Available Purpose. The paper involves: 1 confirmation of the technical characteristics of cars and their modifications, as well as indicators of unfailing work probability during the time between overhauls or service hours; 2 improving the methodological approaches to assess the maintenance characteristics of new and modernized equipment of rail transport on the example of not self-propelled rolling stock, namely, railway freight cars; 3 solution of scientific and applied problems in assessment the maintenance characteristics of the new and modernized railway equipment. Methodology. The basic methodological approaches to the assessment of the maintenance characteristics on the example of not self-propelled rolling stock, namely, railway freight cars were considered. The analysis of the reliability of the car, which is considered as a complex mechanical system, where all system elements are connected in series, wherein each element includes m is serially connected parts. The failure of each part of the calculation will result in refusal of the car. Thus, the car is a system without redundancy. Findings. The evaluation technic of the maintenance characteristics of freight cars in controlled operation with taking into account the features of the new generation of cars was improved. Specified: the duration of the tests, the frequency of inspection of the control group of cars controlled by the parameters of the car, the reasons for the early termination of controlled operation. Identified failures in the process of controlled operation are divided according to their nature. Originality. The authors proposed a method of assessing the maintenance characteristics of railway equipment in trial operation as an example of a new generation of freight cars. Practical value. The results allow assessing the maintenance characteristics of new and modernized rail transport equipment during the maintenance test.

  8. Technical diagnostics - equipment monitoring for increasing safety and availability of nuclear power plants

    International Nuclear Information System (INIS)

    Sturm, A.; Foerster, R.

    1977-01-01

    Utilization of technical diagnostics in equipment monitoring of nuclear power plants for ensuring nuclear safety, economic availability, and for decision making on necessary maintenance is reviewed. Technical diagnostics is subdivided into inspection and early detection of malfunctions. Moreover, combination of technical diagnostics and equipment monitoring, integration of technical diagnostics into maintenance strategy, and problems of introducing early detection of malfunctions into maintenance management of nuclear power plants are also discussed. In addition, a compilation of measuring techniques used in technical diagnostics has been made. The international state of the art of equipment monitoring in PWR nuclear power plants is illustrated by description of the sound and vibration measuring techniques. (author)

  9. Remote Operation and Maintenance Demonstration Facility at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1986-01-01

    The Remote Operation and Maintenance Demonstration (ROMD) Facility at the Oak Ridge National Laboratory has been developed by the Consolidated Fuel Reprocessing Program to demonstrate remote handling concepts on advanced nuclear fuel reprocessing equipment and for other programs of national interest. The ROMD facility is a large-volume high-bay area that encloses a complete, technologically advanced remote maintenance system and full-scale development reprocessing equipment. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the US Department of Energy (DOE), the Power Reactor and Nuclear Fuels Development Corporation of Japan, the US Navy, and the National Aeronautics and Space Administration. Extensive tests of manipulative systems and remote maintainability of process equipment have been performed. This paper describes the ROMD facility and key remote maintenance equipment and presents a summary of major experimental activities. 7 refs., 6 figs

  10. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    Rennich, M.J.; Nelson, B.E.

    1994-01-01

    The Tokamak Physics Experiment machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional ''hands-on'' procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and PFC structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  11. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  12. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  13. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  14. Degradation mode analysis: An approach to establish effective predictive maintenance tasks

    International Nuclear Information System (INIS)

    Sonnett, D.E.; Douglass, P.T.; Barnard, D.D.

    1991-01-01

    A significant number of nuclear generating stations have been employing Reliability Centered Maintenance methodology to arrive at applicable and effective maintenance tasks for their plant equipment. The resultant endpoint of most programs has been an increased emphasis on predictive maintenance as the task of choice for monitoring and trending plant equipment condition to address failure mechanisms of the analyses. Many of these plants have spent several years conducting reliability centered analysis before they seriously begin implementing predictive program improvements. In this paper we present another methodology, entitled Degradation Mode Analysis, which provides a more direct method to quickly and economically achieve the major benefit of reliability centered analysis, namely predictive maintenance. (author)

  15. Eleven quick tips for architecting biomedical informatics workflows with cloud computing

    Science.gov (United States)

    Moore, Jason H.

    2018-01-01

    Cloud computing has revolutionized the development and operations of hardware and software across diverse technological arenas, yet academic biomedical research has lagged behind despite the numerous and weighty advantages that cloud computing offers. Biomedical researchers who embrace cloud computing can reap rewards in cost reduction, decreased development and maintenance workload, increased reproducibility, ease of sharing data and software, enhanced security, horizontal and vertical scalability, high availability, a thriving technology partner ecosystem, and much more. Despite these advantages that cloud-based workflows offer, the majority of scientific software developed in academia does not utilize cloud computing and must be migrated to the cloud by the user. In this article, we present 11 quick tips for architecting biomedical informatics workflows on compute clouds, distilling knowledge gained from experience developing, operating, maintaining, and distributing software and virtualized appliances on the world’s largest cloud. Researchers who follow these tips stand to benefit immediately by migrating their workflows to cloud computing and embracing the paradigm of abstraction. PMID:29596416

  16. Eleven quick tips for architecting biomedical informatics workflows with cloud computing.

    Science.gov (United States)

    Cole, Brian S; Moore, Jason H

    2018-03-01

    Cloud computing has revolutionized the development and operations of hardware and software across diverse technological arenas, yet academic biomedical research has lagged behind despite the numerous and weighty advantages that cloud computing offers. Biomedical researchers who embrace cloud computing can reap rewards in cost reduction, decreased development and maintenance workload, increased reproducibility, ease of sharing data and software, enhanced security, horizontal and vertical scalability, high availability, a thriving technology partner ecosystem, and much more. Despite these advantages that cloud-based workflows offer, the majority of scientific software developed in academia does not utilize cloud computing and must be migrated to the cloud by the user. In this article, we present 11 quick tips for architecting biomedical informatics workflows on compute clouds, distilling knowledge gained from experience developing, operating, maintaining, and distributing software and virtualized appliances on the world's largest cloud. Researchers who follow these tips stand to benefit immediately by migrating their workflows to cloud computing and embracing the paradigm of abstraction.

  17. Eleven quick tips for architecting biomedical informatics workflows with cloud computing.

    Directory of Open Access Journals (Sweden)

    Brian S Cole

    2018-03-01

    Full Text Available Cloud computing has revolutionized the development and operations of hardware and software across diverse technological arenas, yet academic biomedical research has lagged behind despite the numerous and weighty advantages that cloud computing offers. Biomedical researchers who embrace cloud computing can reap rewards in cost reduction, decreased development and maintenance workload, increased reproducibility, ease of sharing data and software, enhanced security, horizontal and vertical scalability, high availability, a thriving technology partner ecosystem, and much more. Despite these advantages that cloud-based workflows offer, the majority of scientific software developed in academia does not utilize cloud computing and must be migrated to the cloud by the user. In this article, we present 11 quick tips for architecting biomedical informatics workflows on compute clouds, distilling knowledge gained from experience developing, operating, maintaining, and distributing software and virtualized appliances on the world's largest cloud. Researchers who follow these tips stand to benefit immediately by migrating their workflows to cloud computing and embracing the paradigm of abstraction.

  18. Developing a comprehensive training curriculum for integrated predictive maintenance

    Science.gov (United States)

    Wurzbach, Richard N.

    2002-03-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  19. Enhancement of equipment services for Kozloduy NPP

    International Nuclear Information System (INIS)

    Schultz, Christophe

    2013-01-01

    Conclusion After 5 years of maintenance services, KNPP and AREVA have continuously intensified their partnership Close cooperation between KNPP, AREVA Local Office Engineers and OEM experts Involvement of sophisticated tools for diagnostics and condition monitoring Performance of engineering services and obsolescence evaluation Possibilities to perform equipment modernization of Electrical and IC equipment in future

  20. Report of the Service for maintenance of electric equipment Service - Annex 3; Prilog 3 - Rad sluzbe za odrzavanje elektro opreme reaktora RA u 1975. godini

    Energy Technology Data Exchange (ETDEWEB)

    Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  1. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  2. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  3. A predictive maintenance approach for improved nuclear plant availability

    International Nuclear Information System (INIS)

    Verma, R.M.P.; Pandya, M.B.; Kini, M.P.

    1979-01-01

    Predictive maintenance programme as against preventive maintenance programme aims at diagnosing, inspecting, monitoring, and objective condition-checking of equipment. It helps in forecasting failures, and scheduling the optimal frequencies for overhauls, replacements, lubrication etc. It also helps in establishing work load, manpower, resource planning and inventory control. Various stages of predictive maintenance programme for a nuclear power plant are outlined. A partial list of instruments for predictive maintenance is given. (M.G.B.)

  4. Remote maintenance design activities and research and development accomplishments for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1988-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (rf) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance activities internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For activities external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radiation-waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. 5 figs

  5. Remote maintenance design activities and research and development accomplishments for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology in order to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (RF) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance operations internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For operations external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radioactive waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. (orig.)

  6. 40 CFR 82.158 - Standards for recycling and recovery equipment.

    Science.gov (United States)

    2010-07-01

    ... importers of recycling and recovery equipment intended for use during the maintenance, service, or repair of... recycling or recovery equipment at manufacturing facilities to ensure that each equipment model line that... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Standards for recycling and recovery...

  7. Predictive Maintenance and Robotic System Design

    African Journals Online (AJOL)

    pc

    2018-03-05

    Mar 5, 2018 ... Business objectives include: reduce equipment maintenance time, reduce ... Data Acquisition: Proprietary machine diagnostic systems and sensors .... and Logistics, Volume #IPart# http://www.ifac-papersonline.net,. Identifier ...

  8. Implementation of the Principles of Tpm in Field of Maintenance Preparations

    OpenAIRE

    Vladimíra Schindlerová; Ivana Šajdlerová; Pavel Zmeškal

    2016-01-01

    Total Productive Maintenance (TPM) is one of the ways to ensure efficient production processes. TPM is primarily associated with the management of maintenance of production equipment. This article deals with the possible implementation of total productive maintenance in other field of maintenance of working means, and it the maintenance of preparations. Experience from practice shows that TPM approaches may be suitable for the maintenance management in this field. In this article are stated t...

  9. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  10. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  11. Bionic design methodology for wear reduction of bulk solids handling equipment

    NARCIS (Netherlands)

    Chen, G.; Schott, D.L.; Lodewijks, G.

    2016-01-01

    Large-scale handling of particulate solids can cause severe wear on bulk solids handling equipment surfaces. Wear reduces equipment life span and increases maintenance cost. Examples of traditional methods to reduce wear of bulk solids handling equipment include optimizing transport operations

  12. Integrated service engineers and spare parts planning in the maintenance logistics

    NARCIS (Netherlands)

    Al Hanbali, Ahmad; Zijm, Willem H.M.

    2016-01-01

    We analyze the integrated tactical capacity planning of spare parts supply and workforce allocation in maintenance logistics of advanced equipment. The equipment time-to-failure, spare parts replenishment time, and equipment repair time are random and independent of each other.

  13. Basic Concept and Theoretical Study of Condition-based Maintenance for Power Transmission System

    Institute of Scientific and Technical Information of China (English)

    LIMing; HAN Xueshan; YANG Ming; GUO Zhihong

    2011-01-01

    The appropriate maintenance time for the single equipment can be found easily and efficiently under the background of condition-based maintenance. However, from the perspective of the whole power system, discrepancy between equipment individual and the whole power system would appear. Once this discrepancy can not be coordinated, it will certainly cause contradiction and conflict between individual equipment and the whole system, and lose the integral efficiency. To solve this contradiction and conflicts is of significant meaning.

  14. Managing the maintenance inventory of a cement manufacturer

    Directory of Open Access Journals (Sweden)

    Morne Eloff

    2013-11-01

    Full Text Available Inventory management is a crucial aspect of managing a company successfully. This is even more apparent in the case of maintenance inventories for production equipment, which impact directly on production equipment efficiency. This is a typical inventory management issue for a cement manufacturer that faces the problem of managing its maintenance inventories optimally when certain maintenance items have exceptionally long lead times (100 weeks and values in excess of R500 000. An assessment of the cement manufacturer’s approach to managing its maintenance inventories indicated various shortcomings, which have resulted in a significant level of obsolescence. One approach to managing maintenance inventories efficiently is to implement a classification of the inventory items in terms of their criticality to the cement production process. The critical nature of a component could be established through a risk-based approach (minimisation of the risk of production loss and taking into account the type of maintenance (planned vs unplanned that the component is required for. A risk-based approach should form the basis of the maintenance inventory management of the cement manufacturer as this would allow the cement manufacturer to utilise other inventory management methods effectively. In addition, it is important to ensure that employees are well versed in the different inventory management approaches utilised and that high levels of integration between departments are pursued.

  15. A concept of distributed architecture for maintenance robot systems

    International Nuclear Information System (INIS)

    Asama, Hajime

    1990-01-01

    Aiming at development of a robot system for maintenance tasks in nuclear power plants, a concept of distributed architecture for autonomous robot systems is discussed. At first, based on investigation of maintenance tasks, requirements for maintenance robots are introduced, and structures to realize multi-functions are discussed. Then, as a new design strategy of maintenance robot system, an autonomous and decentralized robot systems is proposed, which is composed of multiple robots, computers, and equipments, and concept of ACTRESS (ACTor-based Robots and Equipments Synthetic System) including communication framework between robotic components is designed. Finally, as a model of ACTRESS, a experimental system is developed, which deals with object-pushing tasks by two micromice and an environment modeler with communicating with each other. Both of parallel independent motion and cooperative motion based on communication is reconciled, and the efficiency of the distributed architecture is verified. (author)

  16. The cost function for the preventive - maintenance replacement problem

    OpenAIRE

    Vilaplana, Jose Perez

    1994-01-01

    Let a discounted continuous review preventive-maintenance replacement model be such that its total discounted cost is given by means of two functional equations. We assume that downtime is caused by equipment breakdowns, and the length of a given downtime is the time necessary to repair the equipment and set it back in operation. The periodic preventive replacement policy is to replace the equipment by a new identical equipment when service age X is reached, or when the equipment ...

  17. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  18. TOTAL PRODUCTIVE MAINTENANCE, A CENTRAL PREOCCUPATION OF THE MANAGERS

    OpenAIRE

    Daniela POPESCU; Adriana SCRIOŞTEANU; ANDREI POPESCU

    2013-01-01

    This present study demonstrates that the role of the mangers in the productive maintenance is currently becoming more important. This assessment is formulated starting from the daily realities regarding the growth of the proportions of productions and along with these the growth of the volume of equipments which need a better care and maintenance for a proper operation. The productive maintenance has developed and emerged out of this necessity. Therefore, the productive maintenance in the eco...

  19. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  20. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  1. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing...

  2. Scientific conference at the Department of Biomedical Sciences, Russian Academy of Medical Sciences

    International Nuclear Information System (INIS)

    Rybakova, M.N.

    1997-01-01

    Review of reports at the scientific conference of the department of biomedical sciences of the Russian Academy of Medical Sciences, held in April, 1997, on the topic of Novel techniques in biomedical studied. Attention was paid to the creation and uses of rapid diagnosis instruments in micro devices, to the development of electron-photon, immuno enzyme and radionuclide techniques and their realization in automatic special equipment. Delay of native industry in creation of scientific-capacious highly efficient products, especially in the field of radiodiagnosis and instruments for laboratory studies was marked

  3. Application of new control technology during the maintenance of equipment in the Laguna Verde nuclear power plant; Aplicacion de nueva tecnologia de control durante el mantenimiento de equipos en la CLV

    Energy Technology Data Exchange (ETDEWEB)

    Ojeda R, M. A. [CFE, Central Laguna Verde, Subgerencia General de Operacion, Veracruz (Mexico)]. e-mail: mario.ojeda@cfe.gob.mx

    2008-07-01

    In the nuclear power plant of Laguna Verde, in normal operation and recharges are carried out activities of preventive maintenance and corrective to different equipment, due to the one displacement of radioactive materials from the vessel of the reactor until the one system of vapor, different radiation levels are generated (from low until very high) in the circuits of vapor and water, the particles can be incrusted on those interior surfaces of the pipes and equipment, creating this way a potential risk of contamination and exhibition during the maintenance of equipment. To help to optimize the dose to the personnel the use of new technology the has been implemented which besides contributing an absolute control of the work, it offers bigger comfort to the one worker during the development of their work, also contributing a supervision more effective of the same one. Using the captured and processed information of the work developed you can use for the personnel's capacitation and feedback of the work for the continuous improvement of the same one. During a reduction of programmed power and normal operation are carried out maintenance correctives and specific works to preserve the readiness and ability of the equipment and with this to maintain the security of the nuclear power plant. The development of the theme it is showing the advances and commitments of personnel to take to excellence to the nuclear power plant of Laguna Verde showing to the obtained results of the dose and benefits of 2 works carried out in the nuclear power plant where tools ALARA were applied as well as the use of the new technology (Video Equipment of Tele dosimetry and Audio 'VETA') in works carried out in the building of purification level 10.15, change and cuts of filter of the prefilters of system G16, as well as,the retirement and transfer for its decay of High Integrity Container (HIC) of the building of purification level -0.55 to the Temporary Warehouse in Site

  4. 42 CFR 493.1254 - Standard: Maintenance and function checks.

    Science.gov (United States)

    2010-10-01

    ...'s equipment, instruments, or test systems. The laboratory must perform and document the following... available and modified by the laboratory, or maintenance and function check protocols are not provided by the manufacturer. The laboratory must do the following: (1)(i) Establish a maintenance protocol that...

  5. Managing and controlling maintenance

    International Nuclear Information System (INIS)

    Chavez, G.; Perla, H.F.

    1980-01-01

    A well-planned maintenance-management program can bring organized yet flexible scheduling, improved productivity, and a ready-access data bank. The system detailed in the article, developed for a nuclear power plant, has application to any equipment-intensive facility. Key features of the system include: documentation of all work requirements and their completion; automated prioritizing of work orders; automatic generation of work orders for repetitive work, when due; work lists in priority sequence; deferred, standby, and outage work reports; labor and work-order backlog information; equipment work histories and cumulative failure data

  6. Joint optimization of LORA and spares stocks considering corrective maintenance time

    Institute of Scientific and Technical Information of China (English)

    Linhan Guo; Jiujiu Fan; Meilin Wen; Rui Kang

    2015-01-01

    Level of repair analysis (LORA) is an important method of maintenance decision for establishing systems of operation and maintenance in the equipment development period. Currently, the research on equipment of repair level focuses on economic analy-sis models which are used to optimize costs and rarely considers the maintenance time required by the implementation of the main-tenance program. In fact, as to the system requiring high mission complete success, the maintenance time is an important factor which has a great influence on the availability of equipment sys-tems. Considering the relationship between the maintenance time and the spares stocks level, it is obvious that there are contra-dictions between the maintenance time and the cost. In order to balance these two factors, it is necessary to build an optimization LORA model. To this end, the maintenance time representing per-formance characteristic is introduced, and on the basis of spares stocks which is traditional y regarded as a decision variable, a de-cision variable of repair level is added, and a multi-echelon multi-indenture (MEMI) optimization LORA model is built which takes the best cost-effectiveness ratio as the criterion, the expected num-ber of backorder (EBO) as the objective function and the cost as the constraint. Besides, the paper designs a convex programming algorithm of multi-variable for the optimization model, provides solutions to the non-convex objective function and methods for improving the efficiency of the algorithm. The method provided in this paper is proved to be credible and effective according to the numerical example and the simulation result.

  7. Condition monitoring a key component in the preventive maintenance

    International Nuclear Information System (INIS)

    Isar, C.

    2006-01-01

    The preventive maintenance programs are necessary to ensure that nuclear safety significant equipment will function when it is supposed to. Diesel generator, pumps, motor operated valves and air operated control valves are typically operated every three months. When you drive a car, you depend on lot of sounds, the feel of the steering wheel and gauges to determine if the car is running correctly. Similarly with operating equipment for a power plant - sounds or vibration of the equipment or the gauges and test equipment indicate a problem or degradation, actions are taken to correct the deficiency. Due to safety and economical reason diagnostic and monitoring systems are of growing interest in all complex industrial production. Diagnostic systems are requested to detect, diagnose and localize faulty operating conditions at an early stage in order to prevent severe failures and to enable predictive and condition oriented maintenance. In this context it is a need for using various on-line and off-line condition monitoring and diagnostics, non-destructive inspection techniques and surveillance. The condition monitoring technique used in nuclear power plant Cernavoda are presented in this paper. The selection of components and parameters to be monitored, monitoring and diagnostics techniques used are incorporated into a preventive maintenance program. Modern measurement technique in combination with advanced computerized data processing and acquisition show new ways in the field of machine surveillance. The diagnostic capabilities of predictive maintenance technologies have increased recently year with advances made in sensor technologies. The paper will focus on the following condition monitoring technique: - oil analysis - acoustic leakage monitoring - thermography - valve diagnostics: motor operated valve, air operated valve and check valve - motor current signature - vibration monitoring and rotating machine monitoring and diagnostics For each condition monitoring

  8. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  9. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  10. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  11. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  12. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  13. Aging management and preventive maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    Bessho, Toichi; Sagawa, Wataru; Oyamada, Osamu; Uchida, Shunsuke

    1995-01-01

    It is expected that nuclear power generation will bear main electric power supply for long term. For this purpose, by applying proper preventive maintenance to the nuclear power plants in operation, the maintenance of high reliability and the rate of plant operation is extremely important. Especially it has been strongly demanded to execute efficiently the periodic inspection which is carried out every year to shorten its period and increase the rate of operation, and to maintain the reliability by the proper maintenance for the aged plants with long operation years. As to efficient and short periodic inspection, the preparation is advanced by the guidance of electric power companies aiming at realizing it in nearest fiscal year, and further, effort is exerted for the development of technology in long term to optimize periodic inspection. For securing the reliability of aged plants, it is important to do proper inspection and diagnosis and to take the countermeasures by repair and replacement, based on the grasp of secular change mechanism and the evaluation of life of machinery, equipment and materials. In particular, effort is exerted for the development of maintenance technology for reactor pressure vessels and in-core equipment which are hard to access. The confirmation of the function of remote operation equipment and the establishment of execution condition are carried out by uisng the full scale mock-up of BWR plant. The problems in maintenance service and the activities and results of reliability improvement are reported. (K.I.)

  14. Repair/maintenance design for tokamak experimental fusion reactor

    International Nuclear Information System (INIS)

    1978-10-01

    Repair and maintenance design for JXFR has been studied. The reactor is in eight modules so that a damaged module alone can be separated from the other modules and transferred from the reactor room to a repair shop. Design work covers overhaul procedure, dismounting equipments (overhead cranes, auto welder/cutter and remote handling equipments), transport system of a module (module mounting carriages and rotating carriage), repair equipment for blanket, earthquake-proof analysis of the reactor, reactor room structure, repair shop layout, management of radioactive wastes, time and the number of persons required for overhaul etc. Though the repair and maintenance system is almost complete, there still remain problems for further study in joints of blanket cooling piping, auto welder/cutter and earthquake-proof strength in reactor disassemblage. More detailed studies and R and D are necessary for engineering perfection. (author)

  15. The establish and application of equipment reliability database in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zheng Wei; Li He

    2006-03-01

    Take the case of Daya Bay Nuclear Power Plant, the collecting and handling of equipment reliability data, the calculation method of reliability parameters and the establish and application of reliability databases, etc. are discussed. The data source involved the design information of the equipment, the operation information, the maintenance information and periodically test record, etc. Equipment reliability database built on a base of the operation experience. It provided the valid tool for thoroughly and objectively recording the operation history and the present condition of various equipment of the plant; supervising the appearance of the equipment, especially the safety-related equipment, provided the very practical worth information for enhancing the safety and availability management of the equipment and insuring the safety and economic operation of the plant; and provided the essential data for the research and applications in safety management, reliability analysis, probabilistic safety assessment, reliability centered maintenance and economic management in nuclear power plant. (authors)

  16. Recommendations for managing equipment aging in nuclear power plants

    International Nuclear Information System (INIS)

    Gunther, W.E.; Subudhi, M.; Aggarwal, S.K.

    1992-01-01

    Research conducted under the auspices of the US NRC's Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures

  17. ITER L 6 equatorial maintenance duct remote handling study

    International Nuclear Information System (INIS)

    Millard, J.

    1996-09-01

    The status and conclusions of a preliminary study of equatorial maintenance duct remote handling is reported. Due to issues with the original duct design a significant portion of the study had to be refocused on equatorial duct layout studies. The study gives an overview of some of the options for design of these ducts and the impact of the design on the equipment to work in the duct. To develop a remote handling concept for creating access through the ducts the following design tasks should be performed: define the operations sequences for equatorial maintenance duct opening and closing; review the remote handling requirements for equatorial maintenance duct opening and closing; design concept for door and pipe handling equipment and to propose preliminary procedures for material handling outsides the duct. 35 figs

  18. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  19. Statistical Learning Framework with Adaptive Retraining for Condition-Based Maintenance

    International Nuclear Information System (INIS)

    An, Sang Ha; Chang, Soon Heung; Heo, Gyun Young; Seo, Ho Joon; Kim, Su Young

    2009-01-01

    As systems become more complex and more critical in our daily lives, the need for the maintenance based on the reliable monitoring and diagnosis has become more apparent. However, in reality, the general opinion has been that 'maintenance is a necessary evil' or 'nothing can be done to improve maintenance costs'. Perhaps these were true statements twenty years ago when many of the diagnostic technologies were not fully developed. The developments of microprocessor or computer based instrumentation that can be used to monitor the operating condition of plant equipment, machinery and systems have provided the means to manage the maintenance operation. They have provided the means to reduce or eliminate unnecessary repairs, prevent catastrophic machine failures and reduce the negative impact of the maintenance operation on the profitability of manufacturing and production plants. Condition-based maintenance (CBM) techniques help determine the condition of in-service equipment in order to predict when maintenance should be performed. Most of the statistical learning techniques are only valid as long as the physics of a system does not change. If any significant change such as the replacement of a component or equipment occurs in the system, the statistical learning model should be re-trained or re-developed to adapt the new system. In this research, authors will propose a statistical learning framework which can be applicable for various CBMs, and the concept of the adaptive retraining technique will be described to support the execution of the framework so that the monitoring system does not need to be re-developed or re-trained even though there are any significant changes in the system or component

  20. Predictive maintenance strategy in the graphics departament of a tobacco company

    Directory of Open Access Journals (Sweden)

    Guilherme Francez Toazza

    2015-09-01

    Full Text Available The purpose of this article was to describe the implementation of a strategy for Predictive Maintenance in the graphics department of the company Souza Cruz SA after the techniques of Vibration Analysis, Thermography, Ferrography and Inspection Sensitive. The research method was the action-research. The proposed study is the application of a management Predictive Maintenance acting strategically within the context in which it is embedded. The article reviews the theoretical concepts and Predictive Maintenance techniques mentioned above. In the survey, were raised in the information system of the company, the rate of breakdown of equipment (downtime, waste energy costs, maintenance costs and availability of H / h (man / hour and availability of equipment for the production the period prior to the implementation of a predictive maintenance management and consistent compared with results after this deployment. From the results obtained, it was evident that only preventive maintenance, combined with a model predictive maintenance is not poor enough to maintain the desired reliability in a department of great importance to your company. So, it is possible to say that the implementation of a predictive maintenance strategy can make the Maintenance sector to work strategically with common goals to the company as a whole.

  1. 47 CFR 80.1105 - Maintenance requirements.

    Science.gov (United States)

    2010-10-01

    ... checkoff sheet listing each GMDSS equipment carried on a mandatory basis. (j) If the at-sea maintenance... strength and coding. The test may be conducted on board the ship or at an approved testing or servicing...

  2. Biomedical technology transfer: Bioinstrumentation for cardiology, neurology, and the circulatory system

    Science.gov (United States)

    1976-01-01

    Developments in applying aerospace medical technology to the design and production of medical equipment and instrumentation are reported. Projects described include intercranial pressure transducers, leg negative pressure devices, a synthetic speech prosthesis for victims of cerebral palsy, and a Doppler blood flow instrument. Commercialization activities for disseminating and utilizing NASA technology, and new biomedical problem areas are discussed.

  3. Estimation of component redundancy in optimal age maintenance

    OpenAIRE

    Siopa, Jorge; Garção, José; Silva, Júlio

    2012-01-01

    The classical Optimal Age-Replacement defines the maintenance strategy based on the equipment failure consequences. For severe consequences an early equipment replacement is recommended. For minor consequences the repair after failure is proposed. One way of reducing the failure consequences is the use of redundancies, especially if the equipment failure rate is decreasing over time, since in this case the preventive replacement does not reduce the risk of failure. The estimation of an ac...

  4. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  5. Non-invasive system for monitoring of the manufacturing equipment

    Science.gov (United States)

    Mazăre, A. G.; Belu, N.; Ionescu, L. M.; Rachieru, N.; Misztal, A.

    2017-08-01

    The automotive industry is one of the most important industries in the world that concerns the economy and the world culture. High demand has resulted in increasing of the pressure on the production lines. In conclusion, it is required more careful in monitoring of the production equipment not only for maintenance but also for staff safety and to increase the quality of production. In this paper, we propose a solution for non-invasive monitoring of the industrial equipment operation by measuring the current consumption on energy supply lines. Thus, it is determined the utilization schedule of the equipment and operation mode. Based on these measurements, it’s built an activity report for that equipment, available to the quality management and maintenance team. The solution consists of the current measuring equipment, with self-harvesting capabilities and radio transceiver, and an embedded system which run a server. The current measuring equipment will transmit data about consumption of each energy supply network line where is placed the industrial equipment. So, we have an internal measuring radio network. The embedded system will collect data for the equipment and put in a local data base and it will provide via an intranet application. The entire system not requires any supplementary energy supply and interventions in the factory infrastructure. It is experimented in a company from the automotive industries.

  6. Quality control of repair of equipment for coal preparation plants. Upravlenie kachestvom remonta oborudovaniya ugleobogatitel'nykh fabrik

    Energy Technology Data Exchange (ETDEWEB)

    Okonishnikov, A I; Neskoromnykh, V M; Surzhenko, V S; Sirichenko, R P; Pavlyuchenko, S G; Lesikov, A V

    1984-01-01

    The Ukrniiugleobogashchenie, Kalininsk and Sukhodol'sk coal preparation plants have developed the SUKRO system for control of repair quality of coal preparation equipment in the USSR. The system is based on a system of standards used in coal preparation plants. The following systems of standards used by the SUKRO system are analyzed: organization standards (order of repair in a coal preparation plant, repair planning, spare part systems, methods for determining equipment wear, analysis of equipment failures), standards for maintenance and repair (methods for equipment maintenance, service life of each equipment component or system, structure of preventive repair or repair, organizational models of repair operations, lubrication systems), standards for assessment of labor quality during repair operations. Use of the SUKRO system in the Sukhodol'sk coal preparation plant is evaluated. The SUKRO forms a system of standards for repair and maintenance of equipment considering operation conditions in coal preparation plants, requirements for equipment reliability and service life. (4 refs.)

  7. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  8. Sodium cleaning from sodium contaminated components and operation for experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, B. H.; Kim, J. M.; Kim, T. J.; Nam, H. Y.; Jeong, J. Y.; Choi, B. H.; Choi, J. H

    2007-11-15

    An objective of washing technology development for sodium contaminated equipment is to clean and reuse safely and effectively the used equipment through a washing and maintenance, and recovery of the sodium wastes generated during washing.

  9. DEVELOPMENT OF OPERATING DRIVE SYSTEMS IN ENGINEERING EQUIPMENT

    Directory of Open Access Journals (Sweden)

    A. A. Kotlobai

    2015-01-01

    Full Text Available Engineering machines being in operational service with military units of  engineer troops are fit to their purpose and their application is relevant in modern conditions. Maintenance of operating conditions in engineering equipment which was produced earlier by the USSR enterprises is considered as a rather complicated task due to lack of spare parts because their production has been discontinued.One of the approaches used for maintenance of engineering equipment combat capabilities is modernization of operating drive systems that presupposes replacement of mechanical systems in working element drives by hydrostatic drives which are realized while using modern element base. Usage of hydraulic units in drive systems being in mass production for replacement of mechanical systems manufactured earlier in small batches makes it possible to reduce labour inputs for maintenance and repair of machines. The paper presents some possibilities for development of operating drive systems in engineering equipment. The proposed approach is given through an example of  engineering obstacle-clearing vehicle (IMR-2M and excavation machines (MDK-3 and MDK-2M.Application of a hydraulic drive in working elements of the excavation machines permits to withdraw from cardan  shafts, a gear box, a rotary gear and an overload clutch. A hydraulic motor of the cutter and thrower drive is mounted  on a working element gearbox. While executing modernization of hydraulic systems in excavation machines a pump unit has been proposed for the cutter and thrower drive which consists of a controlled pump and a system for automatic maintenance of the pump operational parameters. While developing the operating drive systems in engineering equipment in accordance with the proposed requirements it is possible to simplify drive systems of working elements and  ensure reliable machinery operation in the units of engineer troops. 

  10. Fast Flux Test Facility interim examination and maintenance cell - past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The first 10 yr of operation were mainly devoted to the disassembly and examination of core component test assemblies. While some maintenance was performed on reactor support equipment, such as the closed-loop ex-vessel machine (CLEM) sodium-wetted grapple, 90% of IEM cell availability has been devoted to core component tests. Some test assemblies originally considered for processing in the IEM cell have not been irradiated; others, not originally planned, have been designed, irradiated, and processed. While no major reactor equipment has required remote repair or maintenance, the IEM cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished and are described

  11. Effectiveness of medical equipment donations to improve health systems: how much medical equipment is broken in the developing world?

    Science.gov (United States)

    Perry, Lora; Malkin, Robert

    2011-07-01

    It is often said that most of the medical equipment in the developing world is broken with estimates ranging up to 96% out of service. But there is little documented evidence to support these statements. We wanted to quantify the amount of medical equipment that was out of service in resource poor health settings and identify possible causes. Inventory reports were analyzed from 1986 to 2010, from hospitals in sixteen countries across four continents. The UN Human Development Index was used to determine which countries should be considered developing nations. Non-medical hospital equipment was excluded. This study examined 112,040 pieces of equipment. An average of 38.3% (42,925, range across countries: 0.83-47%) in developing countries was out of service. The three main causes were lack of training, health technology management, and infrastructure. We hope that the findings will help biomedical engineers with their efforts toward effective designs for the developing world and NGO's with efforts to design effective healthcare interventions.

  12. [Biomedical informatics].

    Science.gov (United States)

    Capurro, Daniel; Soto, Mauricio; Vivent, Macarena; Lopetegui, Marcelo; Herskovic, Jorge R

    2011-12-01

    Biomedical Informatics is a new discipline that arose from the need to incorporate information technologies to the generation, storage, distribution and analysis of information in the domain of biomedical sciences. This discipline comprises basic biomedical informatics, and public health informatics. The development of the discipline in Chile has been modest and most projects have originated from the interest of individual people or institutions, without a systematic and coordinated national development. Considering the unique features of health care system of our country, research in the area of biomedical informatics is becoming an imperative.

  13. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  14. Maintenance training - a modern necessity

    International Nuclear Information System (INIS)

    Bushall, W.

    1987-01-01

    In recent years, there has been an increase in technically advanced systems and equipment and a need for highly skilled and knowledgeable maintenance technicians to maintain them. To implement an effective training program, training groups' and plant staffs' key to success must be cooperation and creativity. This paper deals with plant staff interface and how to effectively conduct performance-based training while holding the line on costs. This paper includes cost effective and innovative measures to produce performance-based training for maintenance disciplines including: Using the plants staff as a resource as subject matter experts in the development and verification of training materials. Using the plant staff as a resource for the construction of training aids. Using salvage and surplus to produce high quality, low cost training aids. Using cutaways for better understanding of he theory of equipment operation. These cost saving practices are currently being used at Gulf States Utilities' River Bend Nuclear Station

  15. Guideline on dependability management for the power industry: detailed description of international power plant equipment dependability indicators

    International Nuclear Information System (INIS)

    Procaccia, H.; Silberberg, S.

    1997-01-01

    Dependability Management involves the management of reliability, availability maintainability and maintenance support, and in the power industry is necessary to ensure that plant meets the Reliability, Availability and Maintainability (RAM) targets set by the Utilities. In 1993, a joint Standard on Dependability Programme Management - Part 1: Dependability Programme Management), ISO 9000-': 1993 (Quality Management and Quality Assurance Standards - Part 4: Guide to Dependability Programme Management). UNIPEDE established a group of experts (Nulethermaint) to produce guidelines on its implementation specifically for use in the power industry. The present document comprises Part 2 OF THE UNIPEDE plant performance indicators and can be applied to both nuclear and fossil plant. There are five different equipment dependability indicators, all relating to equipment maintenance activities and the impact that these activities have on the loss of both system function and unit capability. Per year, each of the indicators can be applied separately to both preventive maintenance and corrective maintenance, giving rise to as many as ten indicator values for each item of equipment. Used in this way, the indicators provide a comprehensive picture of the maintenance strategy employed for key pieces of equipment, and its effectiveness. They are, therefore, a valuable managerial tool for improving maintenance activities at the unit level within a utility. This document provides guidance on the division of both nuclear and fossil power plant into their component parts and in each case the types of equipment having the most dominant effect on dependability are identified. These are the items which merit the greatest attention with regard to the equipment dependability indicators. (authors)

  16. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Deckman, M.

    1991-01-01

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  17. Medical Physics and Biomedical Engineering in Clinical Environment and Legal Surrounding

    International Nuclear Information System (INIS)

    Medvedec, M.

    2013-01-01

    An application of radiation in medicine is essentially associated with medical physics and biomedical engineering. The purpose of this study is to analyze the perception and the status of clinical medical physicists and biomedical engineers within the current international and Croatian legal framework. The International Labour Organization (ILO) in its International Standard Classification of Occupations (ISCO-08) notes that medical physicists and biomedical engineers are an integral part of the health workforce, alongside those occupations classified as health professionals. International Atomic Energy Agency (IAEA) in its basic safety standards for radiation protection and safety of radiation sources also defines medical physicists as health professional. The World Health Organization (WHO) urges member states to include biomedical engineers in assessment, planning, procurement, implementation and management of health technologies, in particular biomedical devices. The Council of the European Union (EU) in its directives defines qualified professionals, especially experts in medical physics, as workers who carry out physical, technical and radiochemical work in regard to dosimetry, radiation protection, quality assurance and quality control, equipment management, etc. According to the U.S. Office of Labor Statistics, biomedical engineer is an occupation with the third-fastest growth rate in the economy, as projected for the period 2010-2020. It is expected that the role and the importance of medical physics and biomedical engineering profession in Croatia, a member state of ILO, WHO, IAEA and EU, will be soon fully regulated in a way comparable to the career paths of other health professionals within a clinical environment, primarily for the benefit of patients and hospital staff, healthcare facilities and healthcare system in general.(author)

  18. Application of plant Technology Knowledge Infrastructure to plant engineering and maintenance

    International Nuclear Information System (INIS)

    Kawanaka, Tsutomu; Tamaki, Yuji; Ota, Yoshimi; Yoshinaga, Toshiaki

    2006-01-01

    Management and maintenance tools are now greatly available for contributing reduction of maintenance cost and time. These tools surely give us much benefit, but are only for maintaining reliabilities of the equipment. Reliability of the plant depends on the design and actual operating conditions. Accordingly, the matter to do first is to consider facilities in the range of the plant life cycle. This brings the result that 'process property' and 'functional property' are required besides 'equipment property' which has been used for the evaluation index. Because these properties are formed at the designing stage, the beginning of the life cycle, and by applying the equipment function to them, maintenance cost can be reduced without risk increasing. To execute this subject, it is strongly required to accumulate information and data, to build up the Technology Knowledge Infrastructure. This paper reports the system and the way of applying the method to the actual plants. (author)

  19. Excellence method in maintenance with application for cryogenic nuclear unit (EMAC)

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2006-01-01

    Full text: Cryogenic Nuclear Plant (CNP) has as main objectives the development of a technology for the removal of tritium from heavy water used in nuclear plants of CANDU type and finding of a methodology for complete inspection of the equipment used in the presence of tritium at very low temperatures. These aims imply achieving two main stages. The first stage concerns the maintenance conception on a scientific basis, while the second stage concerns the implementation. The first stage implies the management of maintenance in constraints relating to quality, risk and cost. The second stage regards the aspect of design and technology of CNP maintenance. The solution adequate with this conception will lead to a solution viable for implementation. The operative maintenance will be based on RCM (Reliability Centered Maintenance), using NOLAN and HEAP 1978 methodologies. The integrated maintenance through research and implementation demonstrates the design, realization of equipment, the dynamic and and the static complex uses of EMAC in CNP. It is a method of conception and implementation that integrates maintenance for the life cycle in the considered cryogenics systems. The implementation is achieved by means of the software LabVIEW applied to the specific objectives of the Program for Operative Maintenance in Temporal Dynamic Regime (POMTDR). (author)

  20. Proceedings of the CIM maintenance engineering/mine operators' conference; Comptes rendus du colloque de ICM sur l'ingenierie de maintenance et l'exploitation miniere

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This conference provided a forum to exchange knowledge and best practices that apply to to modern underground mining. It highlighted the synergy and co-operation that is essential for successful operations and maintenance practices. Solutions to mitigate increasing ventilation costs were presented along with possible alternatives to diesel powered equipment in order to maintain air quality at a level that is acceptable for human workers. The themes for the technical program were innovation and performance improvement; maintenance, and mining. The sessions were entitled: deep mining; environment; mining best practices; ground control; energy efficiency; research and development in mining; mining methods; narrow-vein mining; innovative equipment; predictive maintenance; research and development in maintenance; and, planning and scheduling. The conference featured 24 presentations, of which 5 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  1. A maintenance support system with document handling capability

    International Nuclear Information System (INIS)

    Fukumoto, A.; Tsumura, K.; Fujii, M.; Tai, I.; Makimo, M.; Watanabe, T.

    1990-01-01

    An operation and maintenance support system, called 'Advanced Man-Machine System for Nuclear Power Plants' (MMS-NPP) is under development with the support of the Japanese Government. Taking full advantage of Artificial Intelligence technology, the system aims to enhance the capability of already developed 'Computerized Operator Support System (COSS)' and gives wider and more advanced support for operation and maintenance. With a brief overview of MMS-NPP, this paper describes a support system for plant patrol and equipment inspection. The system gives guidance for plant patrol and for equipment inspection and provides easy access to plant drawings and documents. A unique knowledge acquisition method, utilizing image processing technology, was proposed in building the system

  2. Interventional suite and equipment management: cradle to grave

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, Keith J. [Harvard Medical School, Radiology Physics and Engineering, Children' s Hospital Boston, Boston, MA (United States)

    2006-09-15

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  3. Interventional suite and equipment management: cradle to grave

    International Nuclear Information System (INIS)

    Strauss, Keith J.

    2006-01-01

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  4. Functional Problems and Maintenance Operations of Hydraulic Turbines

    Directory of Open Access Journals (Sweden)

    Liliana Topliceanu

    2016-02-01

    Full Text Available The exploitation in good conditions of the hydroelectric power plant imposes a rigorous maintenance of equipment and operating facilities, primarily of the turbine. The efficiency of the turbine is strongly affected by any defects which could occur during the operation. The paper makes a synthesis of the most frequent failures which have occurred during the functioning of Kaplan turbines plant and the required maintenance plan that has to be adopted. The maintenance rules for the optimal working of these turbines are also emphasized.

  5. TPX in-vessel remote maintenance tooling

    International Nuclear Information System (INIS)

    Rennich, M.J.; Silke, G.W.

    1995-01-01

    The Tokamak Physics Experiment (TPX) has used the lessons learned from successful remote maintenance and remote handling facilities to develop both a concept and philosophy for incorporation of remote design from the earliest phases of the project. Initiation of mockup testing during the conceptual design phase leads to significant improvements in the basic maintenance equipment configuration. In addition, remote handling features and capabilities have been incorporated into the design of the plasma-facing components (PFCs) as part of the total PFC design effort

  6. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  7. Double-Shell Tanks System Maintenance and Recovery Needs Report

    International Nuclear Information System (INIS)

    SMITH, D.F.

    2002-01-01

    This report represents an initial effort to identify maintenance equipment needed to support critical components used for delivery of waste feed to the Waste Isolation and Treatment Plant (WTP). Rough estimates of cost benefits for selected maintenance capabilities are provided. A follow-on to this report should include a detailed cost analysis showing cost benefits and tradeoffs in selection and development of specific maintenance capabilities. Critical component failures during delivery of waste feed from the DSTs to the WTP have the potential to idle WTP facilities if the duration of the recovery operations are long enough to allow the WTP to exhaust a planned 60-day lag storage capacity for waste feed. If a critical component within the transfer route fails, current planning does not provide for an alternative HLW feed source. Critical components with relatively high failure frequencies and recovery times are identified, along with a summary of documentation regarding historical maintenance and recovery operations and planning. Components, such as mixer pumps and transfer pumps, are estimated to have relatively long recovery times due, in part, to the current practice of sending spare pumps, when needed, off-site to a remote location, for vendor refurbishment and testing prior to installation in a tank. No capability is provided on-site for pump ''run-in''. As neither the spare pumps in storage, installed pumps, or other critical components are subjected to periodic preventive maintenance, and these critical components are planned to be operated intermittently over a long period of time, component failures are to be expected. Recommendations are made for further analysis to identify specific equipment cost benefits, development costs, and tradeoffs in selection of alternatives. This new equipment will provide capabilities for component storage and maintenance in line with vendor recommendations, reduce the duration of recovery operations, and support personnel

  8. Design of underground layout and their maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Bok Youn; Kang, Chang Hee; Jo, Young Do; Lim, Sang Taek [Korea Institute of Geology Mining and Materials, Taejon (Korea, Republic of)

    1997-12-01

    Layout of underground structure has to be designed based on rock mechanical analysis and the concept of active support has to be adopted considering the large openings are requested to accommodate heavy duty diesel equipment in underground. Rock bolt and shotcrete will be the most applicable method to support such a large dimensional tunnels. 1) Direction: The main haulage way of the mines where diesel equipment are operating is ramp way system. For optimizing safety measures, and minimizing maintenance cost of the tunnels, it is strongly recommended that all the tunnels including ramp way, rooms and sublevels should be designed in parallel to the direction of principal stress and perpendicular to the direction of major discontinuity. 2) Inclination: Basically, the inclination of the ramp way depends on the specification of the equipment, but 10-15% is usual. The steep inclination needs less initial investment but there will be an adverse effects such as higher operating and maintenance costs. 3) Profile (Cross section): The maximum dimension of the equipment operating in local mines appeared 12.8m long, 3.705m wide and 3.68m high. Considering the dimension, the requested profile simply can be calculated to 4m x 4m, but it should be decided according to the regulated minimum clearances from the walls and roof. The minimum inner curvature radius of the tunnels should be more than 5.2m, and in this case, the tunnel width of the curved zone should be more than 5.5m. 4) Sight distance and braking distance: For the safe operation of the equipment, the sight distance must be longer than braking distance, so that the driver can hold up the equipment safely after finding the obstacles in front of him. The maximum braking distance without heating of brake shoe is 60m. 5) Support and maintenance: Due to the large dimensional tunnels where diesel equipment are operating, the conventional supporting system is not applicable. Therefore, the active support concept should be

  9. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  10. Development and application of computerized maintenance management system at a nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Oh, Yon Woo; Kim, S. D.; Jang, K. D.; Kim, Y. G.

    2001-12-01

    In order to accomplish the purpose of research, it is the most important for the equipment to work well. The computerized maintenance management system proven by the case-studies can have an effect on the research and it can be one of the most major elements to assist the research at the research laboratory. To prevent the breakdown of the equipment at the research facility which can hinder the improvement of the research work, it is essential to maintain the equipment of facility without the sudden breakdown and to short the recovery time. If these elements such as the causes of the breakdown were well-managed and suvervised with care, this recovery time could be minimized. The aims of this research, therefore, are to introduce the development of the computerized maintenance management system and to apply it at the field in order to minimize the breakdown of the equipment and the recovery time and in order to perform the equipment maintenance service with the minimized expense and maximize the service efficiency through the planned management of the budget, the manpower and the service

  11. Development of preventive maintenance technology and advanced service equipment for operating nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Kazuhiro; Sumikawa, Masaharu; Hirakawa, Hiromasa; Arakawa, Tadao; Hasegawa, Kunio; Kato, Kanji.

    1990-01-01

    Hitachi Ltd. as a manufacturer of nuclear power plants has carried out the consistent general preventive maintenance activities from the planning of the plants and the design of maintainability in the construction phase to the planning and working of preventive maintenance in the operation and maintenance phase, and exerted efforts to heighten the capacity ratio and reliability of the plants. For the purpose, the steady activities of reliability improvement have been carried out throughout the whole company, and the rationalization of the planning and management of the preventive maintenance with a computer and the development of the robots to which Al is applied have been promoted. As the technology of upgrading the facilities, boron racks, the control rods having long life and so on were developed, and their practical use is advanced. Moreover for the future, the development of the diagnostic technology on material deterioration using superconductive quantum interference devices (SQUID) is in progress. The preventive maintenance activities in Hitachi Ltd., the technical development for the purpose and the upgrading of the plant facilities are reported. (K.I.)

  12. Development of electromagnetic induction diagnostics technology for condition based maintenance

    International Nuclear Information System (INIS)

    Mawatari, Shingo; Oeda, Kaoru; Yatogi, Hideo; Fukuchi, Taira; Ueno, Tadashi

    2008-01-01

    In ROKKASHO Reprocessing Plant (below, called 'RRP'), we have applied Condition Based Maintenance to rotating equipment with vibration diagnostics technology. However, a few rotating equipment are difficult to diagnose definitely, because have structural problems which exercise vibrational noise to peripheral and be impossible to install vibratory sensor. Electromagnetic induction diagnostics technology which measure magnetic fields to eddy current which is induced to rotary through static magnetic field, diagnose deterioration behavior such as abrasion and crack. As a result, it has possibilities to clear above problems. Therefore, we started our basic researches with this technology for Condition Based Maintenance. In this paper, it introduces basic data about 'Non-seal pump' that have installed in RRP. As a result, this technology is a possibility that be able to detect Condition Based Maintenance. (author)

  13. Remote operational trials with the ITER FDR divertor handling equipment

    International Nuclear Information System (INIS)

    Irving, M.; Baldi, L.; Benamati, G.; Galbiati, L.; Giacomelli, S.; Lorenzelli, L.; Micciche, G.; Muro, L.; Polverari, A.; Palmer, J.; Martin, E.

    2003-01-01

    The ITER divertor test platform (DTP) located at ENEA's Research Centre in Brasimone, Italy is a full-scale mock-up of a 72 deg. arc of the ITER 1998 vessel divertor region--the result of a major initiative over the period 1996-2000. Since the implementation of this facility, the design of the ITER vessel--and therefore much of the remote maintenance equipment--has changed substantially. However, the nature and principles of the remote handling equipment are still very similar, and hence many valuable lessons can yet be learned from the existing equipment for the future. In particular, true remote handling tests of the major maintenance subsystems were seen as an important step in determining their suitability for ITER. This paper describes and documents a series of three, discrete, remote-handling trials carried out using most of the major DTP subsystems, and presents an overview of the conclusions and suggestions for future development of ITER cassette remote handling equipment

  14. Translational science matters: forging partnerships between biomedical and behavioral science to advance the public's health.

    Science.gov (United States)

    Mensah, George A; Czajkowski, Susan M

    2018-03-29

    The prevention and effective treatment of many chronic diseases such as cardiovascular disease, cancer and diabetes are dependent on behaviors such as not smoking, adopting a physically-active lifestyle, eating a healthy diet, and adhering to prescribed medical and behavioral regimens. Yet adoption and maintenance of these behaviors pose major challenges for individuals, their families and communities, as well as clinicians and health care systems. These challenges can best be met through the integration of the biomedical and behavioral sciences that is achieved by the formation of strategic partnerships between researchers and practitioners in these disciplines to address pressing clinical and public health problems. The National Institutes of Health has supported a number of clinical trials and research initiatives that demonstrate the value of biomedical and behavioral science partnerships in translating fundamental discoveries into significant improvements in health outcomes. We review several such examples of collaborations between biomedical and behavioral researchers, describe key initiatives focused on advancing a transdisciplinary translational perspective, and outline areas which require insights, tools and findings from both the biomedical and behavioral sciences to advance the public's health.

  15. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  16. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  17. On line performance monitoring for predictive maintenance [Paper No.: VIA - 2

    International Nuclear Information System (INIS)

    Gupta, R.K.; Chandra, Rajesh

    1981-01-01

    There will always be progressive deterioration in the performance of dynamic equipment due to normal inevitable wear, malfunctions, failures and other reasons. In most cases it is possible to monitor some parameters of a system which would get progressively affected with the deterioration in the health of the system. By on-line monitoring of such predetermined parameters, compared with preset base data generated for a healthy system earlier, would prove very helpful in avoiding breakdowns and in proper planning of preventive and predictive maintenance. With increasing use of on-line computerised controls the generation of design base data and also the in-built self checking feature of monitoring the equipment health can be achieved by incorporating suitable software. This type of system will be helpful in: (a) predicting the life of component, (b) prewarning the operator about impending malfunctions, (c) establishing a maintenance schedule and spare inventory, and (d) analysing the failures. This type of centralised predictive maintenance is increasingly becoming important where: (a) the number of equipments are large, (b) the operation of equipment is critical from safety criteria, and (c) the minimum safety margin in the performance of the component is to be maintained. Keeping this in mind, the Fuel Handling System of Narora Atomic Power Project and the future power plants having computerised controls will have facility for on-line performance monitoring for predictive maintenance. The paper also describes methodology of the technique in detail, with a few representative cases. (author)

  18. Adaptation and Implementation of Predictive Maintenance Technique with Nondestructive Testing for Power Plants

    International Nuclear Information System (INIS)

    Jung, Gye Jo; Jung, Nam Gun

    2010-01-01

    Many forces are pressuring utilities to reduce operating and maintenance costs without cutting back on reliability or availability. Many utility managers are re-evaluating maintenance strategies to meet these demands. To utilities how to reduce maintenance costs and extent the effective operating life of equipment, predictive maintenance technique can be adapted. Predictive maintenance had three types program which are in-house program, engineering company program and mixed program. We can approach successful predictive maintenance program with 'smart trust' concept

  19. Integrated logistics management system for operation of machinery and equipment

    Directory of Open Access Journals (Sweden)

    Józef Frąś

    2014-09-01

    Full Text Available Background: The main issue in the operations of machinery and equipment, which is the subject of theoretical and empirical research is to provide high reliability and durability with qualitative post-trade services of machinery and equipment. Quality of service can be achieved through planned maintenance activities supported by computer technology. The article presents the concept of an integrated system of logistics management operation of machinery and equipment, especially special one for stationary transport equipment. At the outset, it emphasized the importance and essence of technological transport and storage systems storage in modern manufacturing enterprise. Then the objective and the method of research have been set. An essential part of deliberations in the article is the concept of integrated logistics management system operation for stationary transport equipment. Authors of this article have presented the results the implementation and operation of the system. The results are presented in a descriptive and graphic form. Methods: The purpose of this article is to present the concept of implementing an integrated logistics management system for operation of stationary transport equipment. It goes through combination of planning, event logging service, warehouse management in the field of spare parts, account and records of the cost of service activities. The paper presents an analysis and evaluation method of brainstorming a new approach to logistics management operation stationary transport equipment. Authors takes into account the specific conditions of use of transport equipment and conduct the service, which have a significant impact on the time and place of cost and service as well. It should be noted that the developed system has been implemented. It was also carried out an assessment of its functionality and efficiency as the new IT tool for logistics management operation. Results and conclusions: The paper presents a new

  20. Implementation of the Principles of Tpm in Field of Maintenance Preparations

    Directory of Open Access Journals (Sweden)

    Vladimíra Schindlerová

    2016-09-01

    Full Text Available Total Productive Maintenance (TPM is one of the ways to ensure efficient production processes. TPM is primarily associated with the management of maintenance of production equipment. This article deals with the possible implementation of total productive maintenance in other field of maintenance of working means, and it the maintenance of preparations. Experience from practice shows that TPM approaches may be suitable for the maintenance management in this field. In this article are stated the conclusions drawn from the implementation of the principles of TPM in a concrete enterprise having available about 14,400 preparations.

  1. Research and Development of a Network-Based Intelligent Maintenance Information System

    Institute of Scientific and Technical Information of China (English)

    ZANG Tie-gang; YANG Ming-zhong; GUO Shun-sheng

    2003-01-01

    A maintenance information system is an important part of equipment management. An intelli gent maintenance information system ( IMIS) is a synthesis of network technology, information technology and intelligent technology. The IMIS is used to finish flexible maintenance decision-making and fast maintenance planning, which helps enterprises to effectively reduce maintenance cost and increase working efficiency. Because the IMIS integrates advanced technologies, its performance is better than a traditional one.The difference between an IMIS and a traditional maintenance information system, and the functions, structure, important realizations, and application of an IMIS are discussed in this paper.

  2. Plant and equipment division laboratory services series: a ten-year building-maintenance cost history

    International Nuclear Information System (INIS)

    Keesee, H.F.

    1976-09-01

    Maintaining a multifacility national laboratory in a safe, reliable condition is a complex management responsibility in terms of budgets, costs, and proper utilization of personnel and material resources. Increasing wage rates and material costs, combined with decreased budgets and aging facilities, create unusual challenges to maintenance managers. A ten-year history of building-maintenance costs, a brief description of the maintenance program, analyses of personnel requirements, cost increase indexes, unit costs, cost controls, procedures, and a brief discussion of alterations and improvements are presented

  3. [Biomedical waste management in five hospitals in Dakar, Senegal].

    Science.gov (United States)

    Ndiaye, M; El Metghari, L; Soumah, M M; Sow, M L

    2012-10-01

    wheelbarrows in 33.7% (N = 29). Biomedical waste was disposed of in old incinerators or in artisanal ovens with a great deal of smoke emanating from these. Working conditions were deemed poor by 81.3% (N = 61) of employees interviewed and personal protection equipment was available in 45.3% (N = 39) of services. Knowledge about biomedical waste management was deemed satisfactory by 62.6% (N = 47) of interviewees and 80% (N = 60) were aware of the health risks related to biomedical waste. The poor management of biomedical waste is a reality in hospital facilities in Dakar. This can be addressed by increasing the awareness of managers for an effective application of the legislation, implementing realistic management programmes and providing the appropriate on-the-job training to staff members.

  4. Current status of research and development on remote maintenance for fusion components

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi

    2008-01-01

    There is a growing attention to remote maintenance of nuclear fusion reactors. Remote maintenance is planned in ITER tokamak to keep the health of in-vessel components like blankets and divertors. In this article, current status of the development in the remote maintenance equipments and methods, especially for ITER tokamak are reviewed. The newly developed vehicle type and boom type maintenance devices, manipulator, and transfer cask are illustrated. (J.P.N.)

  5. Rules and management of biomedical waste at Vivekananda Polyclinic: A case study

    International Nuclear Information System (INIS)

    Gupta, Saurabh; Boojh, Ram; Mishra, Ajai; Chandra, Hem

    2009-01-01

    -of-the-art facilities and on-going training in order to develop a model biomedical waste management system in the Polyclinic. There is also a need to create awareness among all other stakeholders about the importance of biomedical waste management and related regulations. Furthermore, healthcare waste management should go beyond data compilation, enforcement of regulations, and acquisition of better equipment. It should be supported through appropriate education, training, and the commitment of the healthcare staff and management and healthcare managers within an effective policy and legislative framework

  6. Performance measures for world class maintenance

    International Nuclear Information System (INIS)

    Labib, A.W.

    1998-01-01

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a 'real time' environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs

  7. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A W [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1999-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  8. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A.W. [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1998-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  9. Exposure parameters in fluoroscopy equipment. Quality control

    International Nuclear Information System (INIS)

    Alonso, M.; Castaneda, M.J.; Matorras, P.; Diaz-Caneja, N.; Gutierrez, I.

    1992-01-01

    Within the quality control program in Diagnostic Radiology currently being undertaken at the 'Marques de Valdecilla' University Hospital, the corresponding specification and procedure prototypes for the control of conventional radioscopy equipment have been elaborated and applied. This paper presents the values proposed in the specifications and those obtained for the following radioscopy equipment parameters: reference kerma, and its reproducibility, kerma linearity, maximum kerma at the skin, and total filtration. The results obtained indicate that the equipment studied could comply with specified requirements if a Maintenance Program were to be implemented in coordination with the Quality Control Program. (author)

  10. Biomedical signal acquisition, processing and transmission using smartphone

    International Nuclear Information System (INIS)

    Roncagliolo, Pablo; Arredondo, Luis; Gonzalez, AgustIn

    2007-01-01

    This article describes technical aspects involved in the programming of a system of acquisition, processing and transmission of biomedical signals by using mobile devices. This task is aligned with the permanent development of new technologies for the diagnosis and sickness treatment, based on the feasibility of measuring continuously different variables as electrocardiographic signals, blood pressure, oxygen concentration, pulse or simply temperature. The contribution of this technology is settled on its portability and low cost, which allows its massive use. Specifically this work analyzes the feasibility of acquisition and the processing of signals from a standard smartphone. Work results allow to state that nowadays these equipments have enough processing capacity to execute signals acquisition systems. These systems along with external servers make it possible to imagine a near future where the possibility of making continuous measures of biomedical variables will not be restricted only to hospitals but will also begin to be more frequently used in the daily life and at home

  11. Biomedical signal acquisition, processing and transmission using smartphone

    Energy Technology Data Exchange (ETDEWEB)

    Roncagliolo, Pablo [Department of Electronics, Universidad Tecnica Federico Santa Maria, Casilla 110-V, ValparaIso (Chile); Arredondo, Luis [Department of Biomedical Engineering, Universidad de ValparaIso, Casilla 123-V, ValparaIso (Chile); Gonzalez, AgustIn [Department of Electronics, Universidad Tecnica Federico Santa MarIa, Casilla 110-V, ValparaIso (Chile)

    2007-11-15

    This article describes technical aspects involved in the programming of a system of acquisition, processing and transmission of biomedical signals by using mobile devices. This task is aligned with the permanent development of new technologies for the diagnosis and sickness treatment, based on the feasibility of measuring continuously different variables as electrocardiographic signals, blood pressure, oxygen concentration, pulse or simply temperature. The contribution of this technology is settled on its portability and low cost, which allows its massive use. Specifically this work analyzes the feasibility of acquisition and the processing of signals from a standard smartphone. Work results allow to state that nowadays these equipments have enough processing capacity to execute signals acquisition systems. These systems along with external servers make it possible to imagine a near future where the possibility of making continuous measures of biomedical variables will not be restricted only to hospitals but will also begin to be more frequently used in the daily life and at home.

  12. Biomedical signal acquisition, processing and transmission using smartphone

    Science.gov (United States)

    Roncagliolo, Pablo; Arredondo, Luis; González, Agustín

    2007-11-01

    This article describes technical aspects involved in the programming of a system of acquisition, processing and transmission of biomedical signals by using mobile devices. This task is aligned with the permanent development of new technologies for the diagnosis and sickness treatment, based on the feasibility of measuring continuously different variables as electrocardiographic signals, blood pressure, oxygen concentration, pulse or simply temperature. The contribution of this technology is settled on its portability and low cost, which allows its massive use. Specifically this work analyzes the feasibility of acquisition and the processing of signals from a standard smartphone. Work results allow to state that nowadays these equipments have enough processing capacity to execute signals acquisition systems. These systems along with external servers make it possible to imagine a near future where the possibility of making continuous measures of biomedical variables will not be restricted only to hospitals but will also begin to be more frequently used in the daily life and at home.

  13. Flexible maintenance system (FMS). Background, concept, and results of technical development

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Watanabe, Osami; Takizawa, Yoji; Ohga, Yukiharu; Ohi, Tadashi

    2006-01-01

    Maintenance works of nuclear power plants have been involved with various people and organizations. Thus human errors are apt to be made. Since 2000, the project on development of flexible maintenance system (FMS) has been conducted for five years in order to make maintenance works more rational and reduce human errors probability. Background, concept and results of technical development to upgrade maintenance works and training are reviewed. Advanced technology such as optical viewing equipments, laser holography inspection systems and neural networks shall be applied to maintenance works. (T. Tanaka)

  14. Long-term development of nuclear maintenance service provider in Slovenia

    International Nuclear Information System (INIS)

    Androjna, A.; Racic, Z.; Balazic, D.

    2004-01-01

    In recent years, most utilities have been facing a challenge of optimizing maintenance costs, while maintaining or improving equipment reliability. As the equipment ages and maintenance skills within the plant staff may decline due to a generation exchange, the challenge becomes even stronger. Consequently, many plants are looking for possible solutions through partnering with maintenance service providers. The fact that there is only one nuclear power plant in Slovenia hinders the development of local maintenance contractors to some extent. Additionally, they have to face everincreasing technical and organizational requirements while a longer fuel cycle and shorter outage durations result in a narrower annual scope of outage activities. In such circumstances, it may be very difficult for local maintenance service providers to retain and improve skills and qualifications in the long run. Even more so, since they also face the need to rejuvenate their staff and the interest of subcontractors to participate diminishes. The paper presents a case on long-term development issues as experienced by NUMIP, the leading Slovenian nuclear maintenance service provider. Above all, we would like to contribute to a better understanding of efficient local maintenance support. NUMIP's future strategic options are explored in light of possible partnering relationship with the nuclear power plant, based on trust, win-win attitude and continuous improvement. Long-term benefits of the proposed partnering are indicated for both parties, the nuclear power plant and the local maintenance service provider. (author)

  15. Research of Monte Carlo method used in simulation of different maintenance processes

    International Nuclear Information System (INIS)

    Zhao Siqiao; Liu Jingquan

    2011-01-01

    The paper introduces two kinds of Monte Carlo methods used in equipment life process simulation under the least maintenance: condition: method of producing the interval of lifetime, method of time scale conversion. The paper also analyzes the characteristics and the using scope of the two methods. By using the conception of service age reduction factor, the model of equipment's life process under incomplete maintenance condition is established, and also the life process simulation method applicable to this situation is invented. (authors)

  16. Equipment maintenance as a tool for raising of safety and efficiency of the NPP'Kozloduy' operation

    International Nuclear Information System (INIS)

    Kichev, E.

    1999-01-01

    The role of the maintenance in the NPP management is discussed. The main links in the management are: NPP executives and their position; maintenance; quantitative characteristics of the maintenance. The described management process gives the opportunity the maintenance optimization on different levels: component, system, unit, plant. The results are valid for other areas with high safety requirements

  17. Support and Maintenance of the International Monitoring System network

    Science.gov (United States)

    Pereira, Jose; Bazarragchaa, Sergelen; Kilgour, Owen; Pretorius, Jacques; Werzi, Robert; Beziat, Guillaume; Hamani, Wacel; Mohammad, Walid; Brely, Natalie

    2014-05-01

    The Monitoring Facilities Support Section of the Provisional Technical Secretariat (PTS) has as its main task to ensure optimal support and maintenance of an array of 321 monitoring stations and 16 radionuclide laboratories distributed worldwide. Raw seismic, infrasonic, hydroacoustic and radionuclide data from these facilities constitutes the basic product delivered by the International Monitoring System (IMS). In the process of maintaining such a wide array of stations of different technologies, the Support Section contributes to ensuring station mission capability. Mission capable data availability according to the IMS requirements should be at least 98% annually (no more than 7 days down time per year per waveform stations - 14 continuous for radionuclide stations) for continuous data sending stations. In this presentation, we will present our case regarding our intervention at stations to address equipment supportability and maintainability, as these are particularly large activities requiring the removal of a substantial part of the station equipment and installation of new equipment. The objective is always to plan these activities while minimizing downtime and continuing to meet all IMS requirements, including those of data availability mentioned above. We postulate that these objectives are better achieved by planning and making use of preventive maintenance, as opposed to "run-to-failure" with associated corrective maintenance. We use two recently upgraded Infrasound Stations (IS39 Palau and IS52 BIOT) as a case study and establish a comparison between these results and several other stations where corrective maintenance was performed, to demonstrate our hypothesis.

  18. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap [Multipurpose Research Reactor G.A. Siwabessy, National Nuclear Energy Agency (Indonesia)

    1999-10-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  19. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    International Nuclear Information System (INIS)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap

    1999-01-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  20. Biomedical engineering and nanotechnology

    International Nuclear Information System (INIS)

    Pawar, S.H.; Khyalappa, R.J.; Yakhmi, J.V.

    2009-01-01

    This book is predominantly a compilation of papers presented in the conference which is focused on the development in biomedical materials, biomedical devises and instrumentation, biomedical effects of electromagnetic radiation, electrotherapy, radiotherapy, biosensors, biotechnology, bioengineering, tissue engineering, clinical engineering and surgical planning, medical imaging, hospital system management, biomedical education, biomedical industry and society, bioinformatics, structured nanomaterial for biomedical application, nano-composites, nano-medicine, synthesis of nanomaterial, nano science and technology development. The papers presented herein contain the scientific substance to suffice the academic directivity of the researchers from the field of biomedicine, biomedical engineering, material science and nanotechnology. Papers relevant to INIS are indexed separately

  1. A guide to radiation protection in the use of X-ray optics equipment

    International Nuclear Information System (INIS)

    Bines, W.P.

    1986-01-01

    A booklet has been produced by a Working Group convened by the Health and Safety Executive to provide practical guidance for all who might be involved in work with X-ray optics equipment, such as designers, manufacturers, users, maintenance workers, inspectors, radiation protection advisers and supervisors. The particular radiation protection aspects described include those in connection with enclosure design and inspection, inter locks, tube shields, shutters and cover plates, administrative controls, monitoring and repair and maintenance of equipment. (UK)

  2. Biomedical photonics handbook biomedical diagnostics

    CERN Document Server

    Vo-Dinh, Tuan

    2014-01-01

    Shaped by Quantum Theory, Technology, and the Genomics RevolutionThe integration of photonics, electronics, biomaterials, and nanotechnology holds great promise for the future of medicine. This topic has recently experienced an explosive growth due to the noninvasive or minimally invasive nature and the cost-effectiveness of photonic modalities in medical diagnostics and therapy. The second edition of the Biomedical Photonics Handbook presents fundamental developments as well as important applications of biomedical photonics of interest to scientists, engineers, manufacturers, teachers, studen

  3. E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation

    OpenAIRE

    Böttcher, O

    2003-01-01

    The new ST-HM contract E072 for the maintenance of transport and handling equipment is designed to obtain the high operating reliability as required for the LHC installation and to respect the situation of limited resources at CERN at the same time. The contract is based on a dynamic maintenance strategy. It contains a flexible maintenance contingent that is essential to prepare the equipment for extremely important and critical utilization phases that will come up during the LHC installation...

  4. Recycling and recommissioning a used biomedical cyclotron

    International Nuclear Information System (INIS)

    Carroll, L.R.; Ramsey, F.; Armbruster, J.; Montenero, M.

    2001-01-01

    Biomedical Cyclotrons have a very long life, but there eventually comes a time when any piece of equipment has to be retired from service. From time to time, we have the opportunity to help find new homes for used cyclotrons which, with relatively modest overhaul and refurbishment, can have many additional years of productive service, and thus represent a very valuable asset. The reasons for retiring a cyclotron vary, of course, but in our experience it is often due to an institution's changing priorities or changing needs, rather than the due to any fundamental age-related deficiency in the cyclotron itself. In this paper we will report on the relocation and successful restoration of a used TCC CP-42 cyclotron, which was moved from M.D. Anderson Hospital in Houston to Denton, Texas in early 1998, where it is presently being used for R and D and commercial production of biomedical isotopes. Ownership of the machine has been transferred to the University of North Texas; facility, manpower, and operational resources are provided by International Isotopes, Inc

  5. Biomedical engineering principles

    CERN Document Server

    Ritter, Arthur B; Valdevit, Antonio; Ascione, Alfred N

    2011-01-01

    Introduction: Modeling of Physiological ProcessesCell Physiology and TransportPrinciples and Biomedical Applications of HemodynamicsA Systems Approach to PhysiologyThe Cardiovascular SystemBiomedical Signal ProcessingSignal Acquisition and ProcessingTechniques for Physiological Signal ProcessingExamples of Physiological Signal ProcessingPrinciples of BiomechanicsPractical Applications of BiomechanicsBiomaterialsPrinciples of Biomedical Capstone DesignUnmet Clinical NeedsEntrepreneurship: Reasons why Most Good Designs Never Get to MarketAn Engineering Solution in Search of a Biomedical Problem

  6. Year 2000 TWRS Maintenance procedure review report

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K

  7. Year 2000 TWRS Maintenance procedure review report

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  8. Operation and maintenance support expert systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo; Hayakawa, Hiroyasu; Fukutomi, Shigeki

    1990-01-01

    Toshiba has been developing expert systems for operation and maintenance support in BWRs. These expert systems are designed to be integrated with conventional plant monitoring systems, and maintenance management systems to provide both comprehensive and powerful support capabilities. Some of these expert systems are already being used on a trial basis both within Toshiba and in electric power utility companies. This paper describes expert systems for the support of plant and equipment monitoring, maintenance scheduling, and maintenance work procedure planning. (author)

  9. TRIZ method application for improving the special vehicles maintenance

    OpenAIRE

    Petrović Saša; Lozanović-Šajić Jasmina; Knežević Tijana; Pavlović Jovan; Ivanov Goran

    2014-01-01

    TRIZ methodology provides an opportunity for improving the classical engineering approach based on personal knowledge and experience. This paper presents the application of TRIZ methods for improving vehicle maintenance where special equipment is installed. A specific problem is the maintenance of the periscopes with heating system. Protective glass panels with heating system are rectangular glass elements. Their purpose is to perform mechanical protection ...

  10. Optimization of maintenance programme at Daya Bay Nuclear Power Station based on RCM analysis results

    International Nuclear Information System (INIS)

    Liu Min

    2003-01-01

    This paper begins with an introduction to Guangdong Daya Bay Nuclear Power Station (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic testing program are continuously modified and optimized, new on-condition maintenance technologies are introduced, non-productive scheduled overhauls are discarded, maintenance costs are effectively controlled, maintenance appropriateness has improved, management of hidden failures is more effective and timely. It will show the benefit of greater equipment reliability brought about by all of these changes, which in turn increases the reliability and safety of the entire power station. (author)

  11. Long-term preventive maintenance of instrumentation control equipment for PWR plants

    International Nuclear Information System (INIS)

    Sugitani, S.; Nanba, M.

    2006-01-01

    Since the PWR plants in Japan have been operated more than 30 years, main instrumentation control equipment of analog systems has been renewed to digital control systems. Renewal works had to be done in short period within periodical inspection term and for several facilities. The Mitsubishi LTD group had been provided with these market needs by its digital control system (MELTAC-NplusR 3) applicable to main instrumentation control equipment for primary and secondary systems and had already finished the renewal for practical plants. (T. Tanaka)

  12. Analysis of Medical Equipment Management in Relation to the Mandatory Medical Equipment Safety Manager (MESM in Japan

    Directory of Open Access Journals (Sweden)

    Kai Ishida

    2014-01-01

    Full Text Available Half a decade has passed since the fifth revision of the medical law and mandatory appointment of a medical equipment safety manager (MESM in hospitals in Japan. During this period, circumstances have changed regarding maintenance of medical equipment (ME. We conducted a survey to examine these changes and the current situation in ME management. Maintenance of ME and related work were found to have increased in many hospitals, but the number of clinical engineering technologists (CETs has only slightly increased. The appointed MESM was a CET or physician in most hospitals. In hospitals where physicians were appointed as the MESM, 81% had operation managers. Many respondents commented that it was difficult for one person to cover all the tasks required by the MESM, due to a lack of knowledge, too much work, or other reasons. This suggests the importance of an operation manager for ME to work under the MESM.

  13. Procuring, maintaining and using equipment: the key issues in controlling exposure to patients

    International Nuclear Information System (INIS)

    Hendra, I.R.F.

    1989-01-01

    Not only are acceptance criteria directly related to the design of medical x-ray equipment and quality assurance exercised during its manufacture, but also its performance, safety and reliability must feature in requirements for procuring new equipment. In the UK this issue is dealt with under the Department of Health and Social Security Manufacturer Registration Scheme for Medical Equipment in its application to radiological equipment. In the UK quality of maintenance services has been considered by one of our Working Parties commissioned by the South-East Thames Regional Health Authority who are the ''Centre of Responsibility'' for diagnostic imaging equipment in the National Health Service. The report prepared from the first phase of activity of this working group describes features of a procurement specification for maintenance services and prescribes complementary duties of contractors and customers. Radiograph reject analysis has indicated human error outweighs unsatisfactory equipment performance as the reason for rejecting poor radiographs. The use in X-ray departments of the kind of manufacturing quality system used by most reputable equipment manufacturers has the potential for a dramatic reduction in exposure. (author)

  14. Biomedical laboratories: architecture and radioprotection principles; Laboratorios biomedicos: arquitetura e principios de radioprotecao

    Energy Technology Data Exchange (ETDEWEB)

    Lapa, Renata [Fundacao Inst. Oswaldo Cruz (CIBio/FIOCRUZ), Rio de Janeiro, RJ (Brazil). Comissao Interna de Biosseguranca; Salgado, Monica Santos [Universidade Federal do Rio de Janeiro (PROARQ/FAU/UFRJ), RJ (Brazil). Fac. de Arquitetura e Urbanismo. Programa de Pos-Graduacao em Arquitetura; Vieira, Valeria Michielin [Universidade Federal do Rio de Janeiro (PROARQ/FAU/UFRJ), RJ (Brazil). Fac. de Arquitetura e Urbanismo. Programa de Pos-Graduacao em Arquitetura; Fundacao Inst. Oswaldo Cruz (FIOCRUZ), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    In institutions where biological research are made and some technologies make use of radioisotope, the radiation protection is an issue of biosecurity for conceptual reasons. In the process of architectural design of Biomedical Laboratories, engineering and architecture reveal interfaces with other areas of knowledge and specific concepts. Exploring the role of architectural design in favor of personal and environmental protection in biological containment laboratories that handle non-sealed sources in research, the work discusses the triad that compose the principle of containment in health environments: best practices, protective equipment, physical facilities, with greater emphasis on the latter component. The shortcomings of the design process are reflected in construction and in use-operation and maintenance of these buildings, with direct consequences on the occupational health and safety, environmental and credibility of work processes. In this context, the importance of adoption of alternatives to improve the design process is confirmed, taking into account the early consideration of several variables involved and providing subsidies to the related laboratories . The research, conducted at FIOCRUZ - a Brazilian health institution, developed from the analysis of the participants in the architectural project, aiming at the formulation of design guidelines which could contribute to the rationalisation of this kind of building construction.

  15. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  16. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  17. Progress in control equipment for fuel-handling machinery

    International Nuclear Information System (INIS)

    Nutting, B.A.

    1986-01-01

    The paper outlines the development of the equipment used to control the fuel-handling machinery associated with nuclear reactors, from the early electromechanical equipment, through solid-state switching logic to programmable controllers and microprocessors. The control techniques have developed along with the technology, and modern systems offer versatility, reliability and ease of design, operation and maintenance. Future trends and developments are discussed together with possible limiting factors. (author)

  18. Status of the maintenance for the KEK 12GEV-PS main ring and power supply

    International Nuclear Information System (INIS)

    Sato, Hikaru; Igarashi, Susumu; Marutsuka, Katsumi; Mikawa, Katsuhiko; Shirakata, Masashi; Sueno, Tsuyoshi; Tokuda, Noboru

    2004-01-01

    More than 30 years passed since the KEK 12GeV-PS construction, some of accelerator equipments are highly radiated, especially the injection and the extraction equipments. In recent years, the higher intensity beam has been required for such as the long baseline neutrino oscillation experiment and rare decay experiments. Then, the circumference of the maintenance work has become severe. Further, almost equipments of main ring and power supply have deteriorated. Status of the Maintenance for the KEK 12GeV-PS main ring and power supply are presented. (author)

  19. Development and application of computerized maintenance management system at a nuclear fuel cycle facilities

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Yon Woo; Kim, S D; Jang, K D; Kim, Y G

    2001-12-01

    In order to accomplish the purpose of research, it is the most important for the equipment to work well. The computerized maintenance management system proven by the case-studies can have an effect on the research and it can be one of the most major elements to assist the research at the research laboratory. To prevent the breakdown of the equipment at the research facility which can hinder the improvement of the research work, it is essential to maintain the equipment of facility without the sudden breakdown and to short the recovery time. If these elements such as the causes of the breakdown were well-managed and suvervised with care, this recovery time could be minimized. The aims of this research, therefore, are to introduce the development of the computerized maintenance management system and to apply it at the field in order to minimize the breakdown of the equipment and the recovery time and in order to perform the equipment maintenance service with the minimized expense and maximize the service efficiency through the planned management of the budget, the manpower and the service00.

  20. Maintenance management of railway infrastructures based on reliability analysis

    International Nuclear Information System (INIS)

    Macchi, Marco; Garetti, Marco; Centrone, Domenico; Fumagalli, Luca; Piero Pavirani, Gian

    2012-01-01

    Railway infrastructure maintenance plays a crucial role for rail transport. It aims at guaranteeing safety of operations and availability of railway tracks and related equipment for traffic regulation. Moreover, it is one major cost for rail transport operations. Thus, the increased competition in traffic market is asking for maintenance improvement, aiming at the reduction of maintenance expenditures while keeping the safety of operations. This issue is addressed by the methodology presented in the paper. The first step of the methodology consists of a family-based approach for the equipment reliability analysis; its purpose is the identification of families of railway items which can be given the same reliability targets. The second step builds the reliability model of the railway system for identifying the most critical items, given a required service level for the transportation system. The two methods have been implemented and tested in practical case studies, in the context of Rete Ferroviaria Italiana, the Italian public limited company for railway transportation.

  1. Periodic imperfect preventive maintenance with two categories of competing failure modes

    Energy Technology Data Exchange (ETDEWEB)

    Zequeira, R.I. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: romulo.zequeira@utt.fr; Berenguer, C. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: christophe.berenguer@utt.fr

    2006-04-15

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists.

  2. Periodic imperfect preventive maintenance with two categories of competing failure modes

    International Nuclear Information System (INIS)

    Zequeira, R.I.; Berenguer, C.

    2006-01-01

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists

  3. Biomedical engineering fundamentals

    CERN Document Server

    Bronzino, Joseph D

    2014-01-01

    Known as the bible of biomedical engineering, The Biomedical Engineering Handbook, Fourth Edition, sets the standard against which all other references of this nature are measured. As such, it has served as a major resource for both skilled professionals and novices to biomedical engineering.Biomedical Engineering Fundamentals, the first volume of the handbook, presents material from respected scientists with diverse backgrounds in physiological systems, biomechanics, biomaterials, bioelectric phenomena, and neuroengineering. More than three dozen specific topics are examined, including cardia

  4. 49 CFR 1242.35 - Repair and maintenance (account XX-26-41).

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Repair and maintenance (account XX-26-41). 1242.35 Section 1242.35 Transportation Other Regulations Relating to Transportation (Continued) SURFACE...-Equipment § 1242.35 Repair and maintenance (account XX-26-41). (a) Where the carrier maintains records of...

  5. [The Application of the Fault Tree Analysis Method in Medical Equipment Maintenance].

    Science.gov (United States)

    Liu, Hongbin

    2015-11-01

    In this paper, the traditional fault tree analysis method is presented, detailed instructions for its application characteristics in medical instrument maintenance is made. It is made significant changes when the traditional fault tree analysis method is introduced into the medical instrument maintenance: gave up the logic symbolic, logic analysis and calculation, gave up its complicated programs, and only keep its image and practical fault tree diagram, and the fault tree diagram there are also differences: the fault tree is no longer a logical tree but the thinking tree in troubleshooting, the definition of the fault tree's nodes is different, the composition of the fault tree's branches is also different.

  6. Optimization of safety equipment outages improves safety

    International Nuclear Information System (INIS)

    Cepin, Marko

    2002-01-01

    Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one

  7. Remote maintenance challenges presented in the ITER engineering design

    International Nuclear Information System (INIS)

    Burgess, T.W.; Herndon, J.N.; Schrock, S.L.; Lousteau, D.C.

    1995-01-01

    Leading fusion energy research institutions are currently engaged in the Engineering Design Activity for the International Thermonuclear Experimental Reactor (ITER). A tokamak reactor design is evolving which emphasizes high system performance in a minimum overall reactor and building size. The resulting high component density dictates careful attention to ITER remote maintenance considerations in the development of the configuration. The complexity and scale of ITER remote maintenance tasks are well beyond the scope of today's experience and technology. This paper discusses the remote maintenance philosophy, describes the basic configuration as it relates to maintenance, and describes the basic procedures and equipment required. Key enabling technology research and development needs are also addressed

  8. Service for maintenance of electrical equipment at the RA reactor, Report for 1977 - Annex III; Prilog III - Rad sluzbe za odrzavanje elektroopreme na reaktoru RA u 1977. godini - Izvestaj

    Energy Technology Data Exchange (ETDEWEB)

    Strezoski, V; Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  9. RCM optimization of a system under both preventive and corrective maintenance

    International Nuclear Information System (INIS)

    Bris, R.; Cepin, M.

    2005-01-01

    Testing and maintenance activities of power electrical equipment are an important potential for both risk and cost reduction. A multi-objective maintenance optimization method is presented based on the Genetic Algorithms (GA) technique. The method determines the optimal schedule of preventive maintenance actions based on minimization both selected risk measure and cost. Applied cost model takes into account both preventive and corrective maintenance. This paper also presents application of the methodology to optimize maintenance of a real distribution network 22 kV. Conclusions and recommendations for practice are made on the basis of obtained results. (author)

  10. A Study on Estimating the Next Failure Time of Compressor Equipment in an Offshore Plant

    Directory of Open Access Journals (Sweden)

    SangJe Cho

    2016-01-01

    Full Text Available The offshore plant equipment usually has a long life cycle. During its O&M (Operation and Maintenance phase, since the accidental occurrence of offshore plant equipment causes catastrophic damage, it is necessary to make more efforts for managing critical offshore equipment. Nowadays, due to the emerging ICTs (Information Communication Technologies, it is possible to send health monitoring information to administrator of an offshore plant, which leads to much concern on CBM (Condition-Based Maintenance. This study introduces three approaches for predicting the next failure time of offshore plant equipment (gas compressor with case studies, which are based on finite state continuous time Markov model, linear regression method, and their hybrid model.

  11. Consideration for solar system exploration - A system to Mars. [biomedical, environmental, and psychological factors

    Science.gov (United States)

    Nicogossian, Arnauld E.; Garshnek, Victoria

    1989-01-01

    Biomedical issues related to a manned mission to Mars are reviewed. Consideration is given to cardiovascular deconditioning, hematological and immunological changes, bone and muscle changes, nutritional issues, and the development of physiological countermeasures. Environmental issues are discussed, including radiation hazards, toxic chemical exposure, and the cabin environment. Also, human factors, performance and behavior, medical screening of the crew, disease prediction, and health maintenance are examined.

  12. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    Science.gov (United States)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  13. 77 FR 17099 - Proposed Extension of Existing Information Collection; Diesel-Powered Equipment for Underground...

    Science.gov (United States)

    2012-03-23

    ... to underground coal miners who work in mines that use diesel-powered equipment. Diesel equipment can... provide important safety protections to underground coal miners who work in mines that use diesel-powered... maintenance of fire suppression systems on the equipment and at fueling stations; exhaust gas sampling...

  14. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  15. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1990-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  16. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1987-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  17. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1988-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  18. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Tanaskovic, M.

    1995-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  19. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  20. Molecular image in biomedical research. Molecular imaging unit of the National Cancer Research Center

    International Nuclear Information System (INIS)

    Perez Bruzon, J.; Mulero Anhiorte, F.

    2010-01-01

    This article has two basic objectives. firstly, it will review briefly the most important imaging techniques used in biomedical research indicting the most significant aspects related to their application in the preclinical stage. Secondly, it will present a practical application of these techniques in a pure biomedical research centre (not associated to a clinical facility). Practical aspects such as organisation, equipment, work norms, shielding of the Spanish National Cancer Research Centre (CNIO) Imaging Unit will be shown. This is a pioneering facility in the application of these techniques in research centres without any dependence or any direct relationship with other hospital Nuclear Medicine services. (Author) 7 refs.