WorldWideScience

Sample records for bingham pump outage

  1. Bingham Pump Outage Pits: Environmental information document

    International Nuclear Information System (INIS)

    Pekkala, R.O.; Jewell, C.E.; Holmes, W.G.; Marine, I.W.

    1987-03-01

    Seven waste sites known as the Bingham Pump Outage Pits located in areas of the Savannah River Plant (SRP) received solid waste containing an estimated 4 Ci of low-level radioactivity in 1957-1958. These sites were subsequently backfilled and have been inactive since that time. Most of the radioactivity at the Bingham Pump Outage Pits has been eliminated by radioactive decay. A total of approximately 1 Ci of activity (primarily 137 Cs and 90 Sr) is estimated to remain at the seven sites. The closure options considered for the Bingham Pump Outage Pits are waste removal and closure, no waste removal and closure, and no action. The predominant pathways for human exposure to chemical and/or radioactive constituents are through surface, subsurface, and atmospheric transport. Modeling calculations were made to determine the risks to human population via these general pathways for the three postulated closure options. An ecological assessment was conducted to predict the environmental impacts on aquatic and terrestrial biota. The relative costs for each of the closure options were estimated. Evaluation indicates that the relative human health risks for all closure options are small. The greatest public risk would occur after the waste site was released to unrestricted public use (assumed to occur in Year 2085) via the groundwater pathway to a well. The cost estimates show that the waste removal and closure option is the most expensive (89.6 million dollars). The cost of the no waste removal and the no action options is $800,000. 35 refs., 26 figs., 47 tabs

  2. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-06-01

    This Proposed Plan is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Proposed Plan is to describe the preferred remedial alternative for addressing the K-Area Bingham Pump Outage Pit (643-1G) (K BPOP) located at the Savannah River Site (SRS) in Aiken, South Carolina and to solicit public comments on the preferred alternative

  3. Final Remediation Report for the K-Area Bingham Pump Outage Pit (643-1G); FINAL

    International Nuclear Information System (INIS)

    Morganstern, M.

    2002-01-01

    The K-Area Bingham Pump Outage Pit (K BPOP) Building Number 643-1G, is situated immediately south and outside the K-Reactor fence line and is approximately 400 feet in length and 60 feet in width. For the K BPOP operable unit, the Land Use Control (LUC) objectives are to prevent contact, removal, or excavation of buried waste in the area and to preclude residential use of the area

  4. Proposed Plan for the R-Area Bingham Pump Outage Pits (643-8G, -9G, -10G) and R-Area Unknown Pits No.1, No.2, No.3 (RUNK-1, -2, -3); FINAL

    International Nuclear Information System (INIS)

    Mundy, S.

    2002-01-01

    The purpose of this proposed plan is to describe the preferred remedial alternative for the R-Area Bingham Pump Outage Pits (R BPOPs) and the R-Area Unknowns (RUNKs) operable unit (OU) and to provide for public involvement in the decision-making process

  5. Power Outages

    Science.gov (United States)

    ... Publications Emergency Alerts Preparedness Portal Preparedness Messaging Calendar Social Media Preparedness Toolkits Preparedness News Languages About Us Build a Kit Close Search Enter Search Term(s): Main Content Home Be Informed Power Outages Power Outages Extended power outages may impact ...

  6. Outages planning

    International Nuclear Information System (INIS)

    Blanquer, N.

    2010-01-01

    The reason of a nuclear power plant outage seems easy. Replace 1/3 of the total core fuel inside reactor for a new, store the old one in a pool and shuffle the rest 2/3 in other positions in the core to optimize fuel burn up. Also is needed to make the preventive, corrective and conservative maintenance, the selected design changes and the regulatory and technical requirements for equipment and systems. To make the plant outage strategy for all the above pack with nuclear safety not challenged is the objective of this article for the Spanish Nuclear Society magazine. (Author)

  7. Bingham Sealing and Application in Vacuum Clamping

    Science.gov (United States)

    Yao, S. M.; Teo, Wee Kin; Geng, Zunmin; Turner, Sam; Ridgway, Keith

    2011-12-01

    Vacuum clamping is extensively used in shell machining. In this paper a Bingham Sealing (BS) is presented and formulized based on Bingham plastic performance. The sealing capability of BS is evaluated in various cases. A new Bingham plastic is developed and the yield stress is measured. The performances of "O"ring sealing and BS with the developed Bingham plastic are compared to the static experiment. In this experiment the same vacuum is achieved and the distortion of the blade with BS is better than that with "O" ring sealing.

  8. Bingham Sealing and Application in Vacuum Clamping

    International Nuclear Information System (INIS)

    Yao, S M; Teo, Wee Kin; Geng Zunmin; Turner, Sam; Ridgway, Keith

    2011-01-01

    Vacuum clamping is extensively used in shell machining. In this paper a Bingham Sealing (BS) is presented and formulized based on Bingham plastic performance. The sealing capability of BS is evaluated in various cases. A new Bingham plastic is developed and the yield stress is measured. The performances of Or ing sealing and BS with the developed Bingham plastic are compared to the static experiment. In this experiment the same vacuum is achieved and the distortion of the blade with BS is better than that with 'O' ring sealing.

  9. Outage management

    International Nuclear Information System (INIS)

    Anonymous

    2006-01-01

    Since constructing Japan's first PWR plant, Mihama Unit 1, MHI has been working to upgrade its technologies. The ongoing goal is to provide PWR nuclear power plants with levels of reliability, safety, economy operation and maintainability unparalleled in the world market. To fulfill its obligations and responsibility as an integrated plant manufacturer in the nuclear industry, MHI keeps a close eye on every facility, component, device and sub-component from the viewpoint of its customers. Backed by its rich experience and advanced technology, MHI continues to enhance the safety, reliability and economy of nuclear plants introducing improvements at every level. MHI continues to develop and improve diagnostic and inspection technologies based on its more than 30 years of experience in inspection and servicing the major and auxiliary facilities within nuclear power plants. MHI secures the integrity of components by developing and deploying technologies to minimize the wear of components and to repair and replace parts either degraded by age or unduly susceptible to wear. MHI backs its development of these technologies with its comprehensive technical capabilities in the design of remote operation equipment and electro mechanics as well as its expertise in basic technologies such as welding and machining. Mitsubishi Heavy Industries, Ltd. is not only a PWR plant constructor, but also offers complete outage support and component services. In partnership with our customers, MHI is helping to reduce outage duration, radiation exposure and costs, by providing its state of the art engineering knowledge, advanced non-destructive examination, inspection, maintenance and repair technologies mentioned above. MHI is performing large equipment refurbishment such as Steam Generator Replacement, Reactor Vessel Head Replacement, LP/HP turbine replacement, and recently completed the first Core Internal Replacement in the world. The following activities are part of the outage

  10. Driving for shorter outages

    International Nuclear Information System (INIS)

    Tritch, S.

    1996-01-01

    Nuclear plant outages are necessary to complete activities that cannot be completed during the operating cycle, such as steam generator inspection and testing, refueling, installing modifications, and performing maintenance tests. The time devoted to performing outages is normally the largest contributor to plant unavailability. Similarly, outage costs are a sizable portion of the total plant budget. The scope and quality of work done during outages directly affects operating reliability and the number of unplanned outages. Improved management and planning of outages enhances the margin of safety during the outage and results in increased plant reliability. The detailed planning and in-depth preparation that has become a necessity for driving shorter outage durations has also produced safer outages and improved post-outage reliability. Short outages require both plant and vendor management to focus on all aspects of the outage. Short outage durations, such as 26 days at South Texas or 29 days at North Anna, require power plant inter-department and intra-department teamwork and communication and vendor participation. In this paper shorter and safer outage at the 3-loop plants in the United States are explained. (J.P.N.)

  11. Cycle 7 outage experience

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The scheduled 58-day refueling outage in preparation for the seventh operating cycle of the Fast Flux Test Facility (FFTF) was successfully completed three days ahead of schedule. The planning and execution of the outage was greatly aided by Project/2 automated scheduling capabilities. For example, the use of ''maintenance windows'' and resource loading capabilities was particularly effective. The value of the planning process was demonstrated by the smooth transition into the outage phase after an early shutdown and set the stage for our best outage to date

  12. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  13. Nuclear power plant outages

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls nuclear power plant safety in Finland. In addition to controlling the design, construction and operation of nuclear power plants, STUK also controls refuelling and repair outages at the plants. According to section 9 of the Nuclear Energy Act (990/87), it shall be the licence-holder's obligation to ensure the safety of the use of nuclear energy. Requirements applicable to the licence-holder as regards the assurance of outage safety are presented in this guide. STUK's regulatory control activities pertaining to outages are also described

  14. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  15. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  16. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  17. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  18. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  19. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  20. Outage information system

    International Nuclear Information System (INIS)

    Svengren, Haakan; Meyer, Brita Diskerud

    2005-09-01

    Today's control room systems are designed to operate during power operation, and there is clearly a need for a system to support control room personnel in automatically supervising the status of the plant during the outage period. In order to improve the supervision of Nuclear Power Plants during outages, three prototypes of the Outage Information system have been designed by the Halden Project, one for PWR and two for BWR. The Outage Information System is presented on a large screen, centrally placed in the control room. There will be a PC connected to manage the system. By using signals from the process as input to logic diagrams reflecting the plant's Safety Technical Specifications, the system automatically is supervising that requirements in Safety Technical Specifications are fulfilled during all plant states of the outage period. The system also automatically gives an overview of the status of safety systems and electrical bus bars. Alarm will occur if a requirement in the Safety Technical Specifications is not fulfilled or if a component planned to be ready for operation, is inoperable. In addition, selected measurements being important during the outage period are presented on the large screen. Which measurements and in which way the values will be presented, depends on the plant's control room design and work practice. (Author)

  1. Outage planning in Japan

    International Nuclear Information System (INIS)

    Nedderman, John.

    1997-01-01

    Nuclear plant operators in Japan are constrained to keep refuelling and maintenance outages to a minimum by the regulation limiting operating cycles to no longer than 13 months. Outage planning by two contrasting operators is described. Hokkaido Electric, which operates only one plant, Tomari, with two PWRs, plans to reduce outage time from the present 65 days in two stages. Detailed review of previous outage schedules has shown that a reduction to 59 days should be achievable by careful planning without any fundamental changes. The second reduction to 49 days will require such measures as relaxing water purity standards, rescheduling fuel unloading and loading shifts and speeding up eddy current testing of primary equipment by using steam generator nozzle dams. Kansai Electric, operating 11 PWRs at three plants, has scope for reducing outages at all of its units using a range of measures. Steam generator replacement in the seven oldest reactors, completed in July 1997, is by far the most significant of these and is expected to save 64 days repair time in a previous average outage time of 131 days. (UK)

  2. Mechanics of Bingham Flow in an Open Channel

    OpenAIRE

    荻原, 能男; 宮沢, 直季; 三浦, 美香

    1988-01-01

    In this paper, the velocity distribution on turbulent Bingham flow in an open channel is derived theoretically and the fitness of this distribution is examined by comparing with results of experiment using the fluid of water and bentonite mixture which shows the behavior of Bingham flow. The results show that the theoretical turbulent velocity distribution obtained here conforms to results of experiment in the region of lower bentonite concentration. By experiment, the empirical fomulae to es...

  3. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  4. The status of the Hanaro class 4 power outage

    International Nuclear Information System (INIS)

    Hyungkyoo, K.; Hoansung, J.; Jongsup, W.

    2004-01-01

    Electric power is essential for all industrial plant. All who use electric power desire a perfect frequency, voltage stability, and reliability all the time. But this cannot be realized in practice because of the many causes of a power supply disturbance that are beyond the control of the utility. Since the first criticality of the Hanaro research reactor, the major reasons for reactor trips were system malfunctions and inexperienced operators in the initial stage of its operation. As Hanaro is stabilizing, the power supply outage becomes the major reason for a reactor trip. This paper describes the status of power supply outages. This paper deals with not only the outages which have an effect on Hanaro operation but also the reasons for the Hanaro class-4 power outages. The class-4 power is a commercial power which supplies the load centers and the large motors such as primary cooling pumps and secondary cooling pumps. Even if a class-4 power outage occurs, Hanaro is safe because of the reactor cooling by natural convection and the flywheel effect of the primary cooling pumps. The analysis of the characteristics and the trends of the outages can provide clues to how the outages can be minimized and what the impact of the outages are on the operation. For the site-wide class-4 power, the latest failure rate has been 2.36 per year and the mean time to repair is 23,78 minutes for the exponentially weighted mowing average. The unavailability of the Class-4 power is 1.5 10 -4

  5. Outage reduction of Hamaoka NPS

    International Nuclear Information System (INIS)

    Hida, Shigeru; Anma, Minoru

    1999-01-01

    In the Hamaoka nuclear power plant, we have worked on the outage reduction since 1993. In those days, the outage length in Hamaoka was 80 days or more, and was largely far apart from excellent results of European and American plants about the 30days. A concrete strategy to achieve the reduction process is the extension of working hours, the changing work schedule control unit for every hour, the equipment improvements, and the improvements of work environments, etc. We executed them one by one reflecting results. As a result, we achieved the outage for 57 days in 1995. Starting from this, we acquired the further outage reduction one by one and achieved the outage for 38 days in 1997 while maintaining safety and reliability of the plant. We advance these strategies further and we will aim at the achievement of the 30·35 days outage in the future. (author)

  6. Diablo Canyon refueling outage program

    International Nuclear Information System (INIS)

    McLane, W.B.; Irving, T.L.

    1991-01-01

    Management of outages has become one of the most talked about subjects in the nuclear power industry in the past several years. Many utilities do not perform refueling outages very well or in the past have had some outages that they would not like to repeat and in some cases do not even like to think about. With the growing cost of energy and the demands placed on utilities to improve capacity factors, it is very easy for management to focus on shortening refueling outage durations as a prime objective in improving overall corporate performance. So it is with Pacific Gas and Electric Company and the Diablo Canyon power plant. A review of their refueling outage performance reflects a utility that is responding to the nuclear industry's call for improved outage performance

  7. 76 FR 53964 - Dale J. Bingham, P.A.; Revocation of Registration

    Science.gov (United States)

    2011-08-30

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Dale J. Bingham, P.A.; Revocation of... Enforcement Administration, issued an Order to Show Cause to Dale J. Bingham, P.A. (Registrant), of Ash Fork... 28 CFR 0.100(b), I order that DEA Certificate of Registration MB1048746, issued to Dale J. Bingham, P...

  8. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  9. PUMPS

    Science.gov (United States)

    Thornton, J.D.

    1959-03-24

    A pump is described for conveving liquids, particure it is not advisable he apparatus. The to be submerged in the liquid to be pumped, a conduit extending from the high-velocity nozzle of the injector,and means for applying a pulsating prcesure to the surface of the liquid in the conduit, whereby the surface oscillates between positions in the conduit. During the positive half- cycle of an applied pulse liquid is forced through the high velocity nozzle or jet of the injector and operates in the manner of the well known water injector and pumps liquid from the main intake to the outlet of the injector. During the negative half-cycle of the pulse liquid flows in reverse through the jet but no reverse pumping action takes place.

  10. 35/30 outage improvement project

    International Nuclear Information System (INIS)

    Clewett, L.

    2011-01-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day outages

  11. 35/30 outage improvement project

    Energy Technology Data Exchange (ETDEWEB)

    Clewett, L. [Bruce Power, Tiverton, Ontario (Canada)

    2011-07-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day

  12. Integrated outages increase Surry's availability

    International Nuclear Information System (INIS)

    Harms, S.R.; Downs, J.L.

    1995-01-01

    This article describes how, through Virginia Power's and Westinghouse's goal-oriented planning philosophy, teamwork and commitment, average outage duration has decreased significantly. During the past 10 years Virginia Power and its nuclear steam supply system (NSSS) services vendor, Westinghouse Electric Corp., have developed a working partnership with one goal in mind: increasing the availability and capacity factors of the North Anna and Surry nuclear power stations while driving down the operating costs of the plants. The outage integration program, steam generator maintenance agreement (SGMA), and integrated radiological services program form the core of this relationship and helped Virginia Power complete one of the most successful outages in Surry Power Station's operating history

  13. A bi-projection method for Bingham type flows

    OpenAIRE

    Chupin , Laurent; Dubois , Thierry

    2015-01-01

    We propose and study a new numerical scheme to compute the isothermal and unsteady flow of an incompressible viscoplastic Bingham medium.The main difficulty, for both theoretical and numerical approaches, is due to the non-differentiability of the plastic part of stress tensor in regionswhere the rate-of-strain tensor vanishes. This is handled by reformulating the definition of the plastic stress tensor in terms ofa projection.A new time scheme, based on the classical incremental projection m...

  14. Outage optimization - the US experience and approach

    International Nuclear Information System (INIS)

    LaPlatney, J.

    2007-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depends heavily on the performance of planned outages. Some reactor fleets, for example Finland and Germany, have demonstrated sustained good outage performance from their start of commercial operation. Others, such as the US, have improved performance over time. The principles behind a successful outage optimization process are: -) duration is not sole measure of outage success, -) outage work must be performed safely, -) scope selection must focus on improving plant material condition to improve reliability, -) all approved outage work must be completed, -) work must be done cost effectively, -) post-outage plant reliability is a key measure of outage success, and -) outage lessons learned must be effectively implemented to achieve continuous improvement. This approach has proven its superiority over simple outage shortening, and has yielded good results in the US fleet over the past 15 years

  15. Management techniques that keep outages on schedule

    International Nuclear Information System (INIS)

    Taylor, R.B.

    1987-01-01

    During the immature operation of the Pickering Units 5 through 8, significant numbers of outages have been required to deal with warranty inspections and equipment problems. Techniques have been developed to ensure that outages are properly planned and managed so that outage time is minimized, overtime is minimized, and capacity factor is maximized, while ensuring that personnel safety is not compromised. Successful outage planning and execution requires the commitment of many on-station and off-station resources groups. Coordination of all of these groups is required both before and during the outage to ensure outage time is not lost due to unavailability of men or equipment at the time they are required. This paper details the control processes that must be used prior to, during, and after an outage to ensure that time is not lost unnecessarily during outages. Successful outage management at Pickering Nuclear Generating Station can be subdivided into three stages; preoutage planning, outage execution, and postoutage review

  16. Pump

    International Nuclear Information System (INIS)

    Mole, C.J.

    1983-01-01

    An electromagnetic pump for circulating liquid -metal coolant through a nuclear reactor wherein opposite walls of a pump duct serve as electrodes to transmit current radially through the liquid-metal in the ducts. A circumferential electric field is supplied to the liquid-metal by a toroidal electromagnet which has core sections interposed between the ducts. The windings of the electromagnet are composed of metal which is superconductive at low temperatures and the electromagnet is maintained at a temperature at which it is superconductive by liquid helium which is fed through the conductors which supply the excitation for the electromagnet. The walls of the ducts joining the electrodes include metal plates insulated from the electrodes backed up by insulators so that they are capable of withstanding the pressure of the liquid-metal. These composite wall structures may also be of thin metal strips of low electrical conductivity backed up by sturdy insulators. (author)

  17. Outage management: A case study

    International Nuclear Information System (INIS)

    Haber, S.B.; Barriere, M.T.; Roberts, K.H.

    1992-01-01

    Outage management issues identified from a field study conducted at a two-unit commercial pressurized water reactor (PWR), when one unit was in a refueling outage and the other unit was at full power operation, are the focus of this paper. The study was conduced as part of the US Nuclear Regulatory Commission's (NRC) organizational factors research program, and therefore the issues to be addressed are from an organizational perspective. Topics discussed refer to areas identified by the NRC as critical for safety during shutdown operations, including outage planning and control, personnel stress, and improvements in training and procedures. Specifically, issues in communication, management attention, involvement and oversight, administrative processes, organizational culture, and human resources relevant to each of the areas are highlighted by example from field data collection. Insights regarding future guidance in these areas are presented based upon additional data collection subsequent to the original study

  18. The control of reactor outages

    International Nuclear Information System (INIS)

    Bouget, Y.H.; Berteloot, J.M.

    1995-01-01

    The 1985-1992 period was marked by a continuous decay in French reactors operation. This situation has led the Committee for Outages Mastery to take steps for the improvement of nuclear power plants availability. The control of reactor outages requires an integrated vision of the safety, duration, dosimetry, costs and security aspects and a perfect management of contractors. The paper describes the methodology used for the management and the maintenance of the French PWR reactors stock. A detailed schedule of maintenance tasks with dose estimations is now required from each site to anticipate and optimize the duration of outages. Thanks to this action, a significant reduction of the maintenance costs is observed for the 1992-1995 period. (J.S.). 2 figs

  19. Outage costs: who should pay?

    International Nuclear Information System (INIS)

    Stivison, D.V.

    1986-01-01

    Decisions affecting the Three Mile Island-1 and -2 reactors illustrate new an stricter standards which apply to how regulator will allocate the costs of outages. The rule allows outages for normal refueling and other normal shutdowns if return to the power grid is assured. TMI-1 was removed from the rate base one year after the accident, and was readmitted only after achieving full power in 1986. A reasonableness standard based on an analysis of the outage and utility responses is the basis for deciding for or against removal. The author cites cases in which unreasonable actions caused the Nuclear Regulatory Commission to charge utility management with imprudence. New safety standards will force utilities to reduce employee error, equipment failure, and management weakness. 19 references

  20. Improving refueling outages through partnership

    International Nuclear Information System (INIS)

    Mercado, Angelo L.

    2004-01-01

    This paper describes an approach to reduce nuclear plant outage duration and cost through partnership. Partnership is defined as a long-term commitment between the utility and the vendor with the objective of achieving shared business goals by maximizing the effectiveness of each party's resources. The elements of an effective partnership are described. Specific examples are given as to how partnership has worked in the effective performance of refueling outages. To gain the full benefits of a partnership, both parties must agree to share information, define the scope early, communicate goals and expectations, and identify boundaries for technical ownership. (author)

  1. Outages planning; Planificacion de recargas

    Energy Technology Data Exchange (ETDEWEB)

    Blanquer, N.

    2010-07-01

    The reason of a nuclear power plant outage seems easy. Replace 1/3 of the total core fuel inside reactor for a new, store the old one in a pool and shuffle the rest 2/3 in other positions in the core to optimize fuel burn up. Also is needed to make the preventive, corrective and conservative maintenance, the selected design changes and the regulatory and technical requirements for equipment and systems. To make the plant outage strategy for all the above pack with nuclear safety not challenged is the objective of this article for the Spanish Nuclear Society magazine. (Author)

  2. Squeeze flow of Bingham plastic with stick-slip at the wall

    Science.gov (United States)

    Muravleva, Larisa

    2018-03-01

    We solve numerically the axisymmetric squeeze flow of a viscoplastic Bingham medium with slip yield boundary condition at the wall. Using the original Bingham model we compute the shape of the yield surface, the velocity, and stress fields employing the augmented Lagrangian methods. We confirm numerically the recently obtained asymptotic solution.

  3. Outage capacity of multicarrier systems

    KAUST Repository

    Yilmaz, Ferkan; Alouini, Mohamed-Slim

    2010-01-01

    The probability density function and the cumulative distribution function of the product of shifted Gamma variates are obtained in terms of the generalized Fox's H function. Using these new results, the exact outage capacity of multi carrier transmission through a slow Nakagami-m fading channel is presented. Moreover, it is shown that analytical and simulation results are in perfect agreement. © 2009 IEEE.

  4. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  5. Outage capacity of multicarrier systems

    KAUST Repository

    Yilmaz, Ferkan

    2010-01-01

    The probability density function and the cumulative distribution function of the product of shifted Gamma variates are obtained in terms of the generalized Fox\\'s H function. Using these new results, the exact outage capacity of multi carrier transmission through a slow Nakagami-m fading channel is presented. Moreover, it is shown that analytical and simulation results are in perfect agreement. © 2009 IEEE.

  6. Activities of maintenance and outage

    International Nuclear Information System (INIS)

    Gracia-Orellan, J. M.; Gonzalez, P. L.; Verdu, M. F.; Fernandez, J. A.

    2004-01-01

    Iberinco Nuclear Generation Department have wanted to promote service activities in nuclear power plants for years besides its dedication to engineering activities. for it, in 1997 Nuclear Services Management was created to complement engineering activities and to be able to make an offer for products and turn key services. People involved in this Management have an extensive experience in Services Area, so that all type of maintenance works are promoted, as well other services like dismantling, fallout management and new equipment's for nuclear power plants services. Iberinco's experience in Support Services in Nuclear Power Plants allows to answer effectively to special workers during operation cycle and outages periods. These activities have been made in spanish nuclear power plants and Angra I and II plants, both of them in Brazil. In this area we provide Technical Consulting Management and Supervision to develop the following activities: - Improvement Maintenance Programs based in PSA: Implantation of Maintenance Rule in the plants. - Supervision and Assembly of design modifications in structures, systems and components. - Fulfilment of efficiency tests, inspection and turbo-group modification. - Noise and vibrations analysis. - Valves and rotative equipment calculations and diagnosis tests. Iberinco develop these outage activities itself or as contractors coordinator under its management. A lot of them have been working with Iberinco for many years and have a great experience in the Service Area they are developing. In this article, the main outage activities developed for Iberinco are detailed. (Author)

  7. Outage management philosophies at Oconee nuclear station

    International Nuclear Information System (INIS)

    Bond, R.T.

    1991-01-01

    At Oconee the biggest single factor in improving availability and cutting cost per kilowatt-hour is reducing outage lengths. This must be accomplished without compromising the quality of the work that must be performed during these outages. Oconee has completed 35 refueling outages and has gained considerable experience in outage management. Since 1984, outage costs and durations have consistently been reduced while continuing to improve capacity factors. The last 6 refueling outages were 43, 42, 45, 42, 41, and 44 days, respectively. The capacity factors for these units between refueling outages are 98, 94, 96, 98, and 98%, respectively. The average cost of outages has been less than $12 million. It is believed that success cannot be attributed to any one factor by itself but is a compilation of many factors, all complementing each other. It is also believed, however, that there are four key areas that represent philosophies and can be given most of the credit for successful outages: planning, experience, teamwork, and outage management

  8. Nuclear power plant outage optimisation strategy

    International Nuclear Information System (INIS)

    2002-10-01

    Competitive environment for electricity generation has significant implications for nuclear power plant operations, including among others the need of efficient use of resources, effective management of plant activities such as on-line maintenance and outages. Nuclear power plant outage management is a key factor for good, safe and economic nuclear power plant performance which involves many aspects: plant policy, co-ordination of available resources, nuclear safety, regulatory and technical requirements and, all activities and work hazards, before and during the outage. This technical publication aims to communicate these practices in a way they can be used by operators and utilities in the Member States of the IAEA. It intends to give guidance to outage managers, operating staff and to the local industry on planning aspects, as well as examples and strategies experienced from current plants in operation on the optimization of outage period. This report discusses the plant outage strategy and how this strategy is actually implemented. The main areas identified as most important for outage optimization by the utilities and government organizations participating in this report are: organization and management; outage planning and preparation, outage execution, safety outage review, and counter measures to avoid extension of outages and to easier the work in forced outages. This report was based on discussions and findings by the authors of the annexes and the participants of an Advisory Group Meeting on Determinant Causes for Reducing Outage Duration held in June 1999 in Vienna. The report presents the consensus of these experts regarding best common or individual good practices that can be used at nuclear power plants with the aim to optimize

  9. Management strategies for nuclear power plant outages

    International Nuclear Information System (INIS)

    2006-01-01

    More competitive energy markets have significant implications for nuclear power plant operations, including, among others, the need for more efficient use of resources and effective management of plant activities such as on-line maintenance and outages. Outage management is a key factor for safe, reliable and economic plant performance and involves many aspects: plant policy, coordination of available resources, nuclear safety, regulatory and technical requirements, and all activities and work hazards, before and during the outage. The IAEA has produced this report on nuclear power plant outage management strategies to provide both a summary and an update of a follow-up to a series of technical documents related to practices regarding outage management and cost effective maintenance. The aim of this publication is to identify good practices in outage management: outage planning and preparation, outage execution and post-outage review. As in in the related technical documents, this report aims to communicate these practices in such a way that they can be used by operating organizations and regulatory bodies in Member States. The report was prepared as part of an IAEA project on continuous process improvement. The objective of this project is to increase Member State capabilities in improving plant performance and competitiveness through the utilization of proven engineering and management practices developed and transferred by the IAEA

  10. Simulations of Bingham plastic flows with the multiple-relaxation-time lattice Boltzmann model

    Science.gov (United States)

    Chen, SongGui; Sun, QiCheng; Jin, Feng; Liu, JianGuo

    2014-03-01

    Fresh cement mortar is a type of workable paste, which can be well approximated as a Bingham plastic and whose flow behavior is of major concern in engineering. In this paper, Papanastasiou's model for Bingham fluids is solved by using the multiplerelaxation-time lattice Boltzmann model (MRT-LB). Analysis of the stress growth exponent m in Bingham fluid flow simulations shows that Papanastasiou's model provides a good approximation of realistic Bingham plastics for values of m > 108. For lower values of m, Papanastasiou's model is valid for fluids between Bingham and Newtonian fluids. The MRT-LB model is validated by two benchmark problems: 2D steady Poiseuille flows and lid-driven cavity flows. Comparing the numerical results of the velocity distributions with corresponding analytical solutions shows that the MRT-LB model is appropriate for studying Bingham fluids while also providing better numerical stability. We further apply the MRT-LB model to simulate flow through a sudden expansion channel and the flow surrounding a round particle. Besides the rich flow structures obtained in this work, the dynamics fluid force on the round particle is calculated. Results show that both the Reynolds number Re and the Bingham number Bn affect the drag coefficients C D , and a drag coefficient with Re and Bn being taken into account is proposed. The relationship of Bn and the ratio of unyielded zone thickness to particle diameter is also analyzed. Finally, the Bingham fluid flowing around a set of randomly dispersed particles is simulated to obtain the apparent viscosity and velocity fields. These results help simulation of fresh concrete flowing in porous media.

  11. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  12. Ontario-U.S. power outages : impacts on critical infrastructure

    International Nuclear Information System (INIS)

    2006-01-01

    This paper described the power outage and resulting blackout that occurred on August 14, 2003 and identified how critical infrastructure was directly and interdependently impacted in Canada. The aim of the paper was to assist critical infrastructure protection and emergency management professionals in assessing the potential impacts of large-scale critical infrastructure disruptions. Information for the study was acquired from Canadian and American media reports and cross-sectoral information sharing with provincial and federal governments and the private sector. The blackout impacted most of the sources and means of generating, transmitting and distributing power within the area, which in turn impacted all critical infrastructure sectors. Landline and cellular companies experienced operational difficulties, which meant that emergency responders were impacted. Newspapers and the electronic media struggled to release information to the public. The banking and finance industry experienced an immediate degradation of services. The power outage caused shipping and storage difficulties for commercial retailers and dairy producers. A number of incidents were reported where only partially treated waste water was released into neighbouring waterways. The timing of the blackout coincided with the closures of workplaces and created additional difficulties on transportation networks. Many gas station pumps were inoperable. Police, fire departments and ambulance services experienced a dramatic increase in the volume of calls received, and all branches of the emergency services sector encountered transportation delays and difficulties with communications equipment. Nuclear reactors were also impacted. An estimated 150,000 Government of Canada employees were unable to report to work. Estimates have indicated that the power outage cost Ontario's economy between $1 and $2 billion. The outage negatively impacted 82 per cent of small businesses in Ontario. 170 refs., 3 figs

  13. Review of Paks outage results 1990

    International Nuclear Information System (INIS)

    Lukacs, P.; Zsoldos, F.; Kiss, Z.

    1991-01-01

    The year 1990 was not the most successful from an outage point of view at the Paks Nuclear Power Plant in Hungary -there were one or two long delays. Work at unit 4 had a delay of 10 days because of an error made during assembling the reactor vessel. While the outage of unit 3 was running, a feedwater pipe hanger problem was discovered - several hangers were found displaced from the right position. A general inspection of the affected system was required and this took about 11 days. Information about each outage is presented on diagrams, making comparison easier. These diagrams give information about deviations from the outage plan, about work hours performed during outages, and about collective exposure. (author)

  14. Outage risk reduction at Diablo Canyon

    International Nuclear Information System (INIS)

    Burnett, Tobias W.T.; Eugene Newman, C.

    2004-01-01

    A formal risk reduction program was conducted at the Diablo Canyon Nuclear Generating plant as part of EPRI's Outage Risk Assessment and Management Program. The program began with a probabilistic and deterministic assessment of the frequency of core coolant boiling and core uncovery during shutdown operations. This step identified important contributors to risk, periods of high vulnerability, and potential mechanisms for reducing risk. Next, recovery strategies were evaluated and procedures, training, and outage schedules modified. Twelve risk reduction enhancements were developed and implemented. These enhancements and their impact are described in this paper. These enhancements reduced the calculated risk of core uncovery by about a factor of four for a refueling outage without lengthening the outage schedule; increased the outage efficiency, contributing to completing 11 days ahead of schedule; and helped to earn the highest achievable SALP rating from the NRC. (author)

  15. Major outage trends in light water reactors. Interim report

    International Nuclear Information System (INIS)

    Burns, E.T.

    1978-04-01

    The report is a summary of the major outages which occurred in light water reactor plants during the period January 1971 through June 1977. Only those outages greater than 100 hours duration (exclusive of refueling outages) are included in the report. The trends in outages related to various reactor systems and components are presented as a function of plant age, and alternatively, calendar year. The principal contributors to major outages are ranked by their effect on the overall outage time for PWRs and BWRs. In addition, the outage history of each operating nuclear plant greater than 150 MWe is presented, along with a brief summary of those outages greater than two months duration

  16. Areva: experiences in outage services

    International Nuclear Information System (INIS)

    Wiemeier, R.; Mueller, N.; Blanco, I. J.

    2010-01-01

    As the world leader in the nuclear industry, Areva is firmly committed to the safe and reliable operation of the Spanish nuclear power plants. Following this commitment, Areva has established the subsidiary Areva NP Services Spain as a local platform to provide nuclear services for the Spanish nuclear power plants. being integrated and supported by the global Areva Group, Areva NP Services Spain is able to offer services solutions to all customers demands while maintaining close and sustainable relationships with them. This integration also allows the Spanish personnel of Areva to employ their skills by working in multinational teams in international projects. This article will present the capacities, and the most important recent national and international project performed by Areva NP Services Spain in the field of outage services. (Author)

  17. Nuclear Power Plant Outage Optimization Strategy. 2016 Edition

    International Nuclear Information System (INIS)

    2016-10-01

    This publication is an update of IAEA-TECDOC-1315, Nuclear Power Plant Outage Optimisation Strategy, which was published in 2002, and aims to communicate good outage management practices in a manner that can be used by operators and utilities in Member States. Nuclear power plant outage management is a key factor for safe and economic nuclear power plant performance. This publication discusses plant outage strategy and how this strategy is actually implemented. The main areas that are important for outage optimization that were identified by the utilities and government organizations participating in this report are: 1) organization and management; 2) outage planning and preparation; 3) outage execution; 4) safety outage review; and 5) counter measures to avoid the extension of outages and to facilitate the work in forced outages. Good outage management practices cover many different areas of work and this publication aims to communicate these good practices in a way that they can be used effectively by operators and utilities

  18. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    drums and that of unit No. 3. Overhaul and inspection of new designs components, such as reactor internal pumps (RIPs), advanced type control rod drive mechanism (FMCRD) and large-capacity and high-efficiency turbine system, were conducted as planned, verifying their integrity after the commercial operation period. Operability during annual outage through ABWR-type main control room panels, which have a very new man-machine interface with touch-screen CRTs and flat displays, was also confirmed. In this paper, the commercial operation and annual outage experience of Kashiwazaki-Kariwa Nuclear Power Station units Nos. 6 and 7 are reported. (author)

  19. WNP-2 outage safety review methodology

    International Nuclear Information System (INIS)

    Chiang, Albert; Fu, James

    2004-01-01

    A practical and versatile method was developed in the flow chart and checklist forms to show the defense-in-depth for various key safety functions of a nuclear power plant during shutdown. Using four different colors (green, yellow, orange, and red) for indication of levels of defense-in-depth is visually impressive, easy to understand, and was adopted by the outage management personnel as a convenient reference tool for maintenance activity planning before the outage, and schedule changes during the outage. This paper describes the method and its application at Washington Public Power Supply System's Nuclear Project 2 (WNP-2). (author)

  20. San Onofre - the evolution of outage management

    International Nuclear Information System (INIS)

    Slagle, K.A.

    1993-01-01

    With the addition of units 2 and 3 to San Onofre nuclear station in 1983 and 1984, it became evident that a separate group was needed to manage outages. Despite early establishment of a division to handle outages, it was a difficult journey to make the changes to achieve short outages. Early organizational emphasis was on developing an error-free operating environment and work culture. This is difficult for a relatively large organization at a three-unit site. The work processes and decision styles were designed to be very deliberate with many checks and balances. The organization leadership and accountability were focused in the traditional operations, maintenance, and engineering divisions. Later, our organization emphasis shifted to achieving engineering excellence. With a sound foundation of operating and engineering excellence, our organizational focus has turned to achieving quality outages. This means accomplishing the right work in a shorter duration and having the units run until the next refueling

  1. Refueling outage data collection and analysis

    International Nuclear Information System (INIS)

    Harshaw, K.; Quilliam, J.; Brinsfield, W.; Jeffries, J.

    1993-07-01

    This report summarizes the results of an EPRI project to compile an industry generic refueling outage database applicable to alternate (non-full-power) modes of shutdown conditions at nuclear power plants. The project team evaluated five outages at two BWR plants. They obtained data primarily from control room logs, outage schedules, incident reports, and licensee event reports. The team organized the data by outage segment and time line. Due to its small sample size, this study produced no conclusive results related to initiating event frequencies, equipment failure rates, or human reliability estimates during shutdown conditions. However, it pointed out the problems of brief or inconsistent recordkeeping. A too brief record results in difficulty determining if the root cause of an event was mechanical or the result of human performance. Retrieval of data can be difficult and labor-intensive. There is a clear need for better, more comprehensive documentation

  2. Partnership - its contribution to outage success

    International Nuclear Information System (INIS)

    Gill, K.S.; Kirton-Darling, F.; Robinson, F.T.

    1996-01-01

    An innovative approach to developing the teamwork between the power station and the outage contractor has been pioneered over the past three years at the Bradwell nuclear power station in the UK, which houses two Magnox reactors. Magnox Electric and Rolls-Royce Nuclear Engineering Services are now undertaking their third outage under a partnership contract which has provided significant benefits to both parties. (Author)

  3. Stopping times in cessation flows of Bingham plastics with slip at the wall

    Science.gov (United States)

    Philippou, Maria; Damianou, Yiolanda; Kaoullas, George; Georgiou, Georgios C.

    2012-09-01

    We solve numerically the cessation of axisymmetric Poiseuille flow of a Bingham plastic assuming that slip occurs along the wall. A power-law expression is used to relate the wall shear stress to the slip velocity. The numerical results show that the velocity becomes and remains uniform before complete cessation and that the stopping time is finite only when the exponent sBingham number and the volumetric flow rate decays exponentially. When s>1, the decay is much slower, i.e. polynomial. The asymptotic expressions for the volumetric flow rate in the case of full-slip are also derived.

  4. Approximate Solution of Dam-break Flow of Low Viscosity Bingham Fluid

    Science.gov (United States)

    Puay, How Tion; Hosoda, Takashi

    In this study, we investigate the characteristics of dam-break flow of low viscosity Bingham fluid by deriving an approximate solution for the time development of the front position and depth at the origin of the flow. The asymptotic solutions representing the characteristic of Bingham fluid in the limit of low plastic viscosity are verified with a depth-averaged numerical model. Numerical simulations showed that with the decrease of plastic viscosity, the time development of the front position and depth at the origin approach to the theoretical asymptotic solution.

  5. Peristaltic transport of Bingham plastic fluid considering magnetic field, Soret and Dufour effects

    Directory of Open Access Journals (Sweden)

    T. Hayat

    Full Text Available Current attempt addresses the peristaltic transport of Bingham plastic fluid under the influence of magnetic force. Space dependent viscosity is considered. Novel Soret and Dufour effects are retained in the mathematical model. Problem formulation is presented through the conventional lubrication approach. Series solutions of the arising non-linear problem are developed via regular perturbation approach. Special attention is given to the role of embedded parameters on the axial velocity, temperature, concentration and pressure distributions. Furthermore the numerical solution of pressure rise per wavelength is obtained through numerical integration because its analytical solution seems impossible. Keywords: Bingham fluid, Variable viscosity, MHD and Joule heating, Soret and Dufour effects

  6. Nuclear outages: an approach to project controls

    International Nuclear Information System (INIS)

    Bryson, R.

    1985-01-01

    The annual budget for maintaining and operating a nuclear power plant has risen dramatically over the past 5 years. NRC-mandated plant improvements and outage related expenses are often cited to be the main contributors to these escalating budgets. Nuclear utilities have responded by developing programs to improve plant availability and outage costs through improved outage performance. Utilities recognize that for capital improvements the program to control costs does no begin with outage planning, but rather more appropriately up front during the engineering phase. To support their management objectives, utilities have been developing comprehensive project control systems for concurrently reducing capital expenditures, outage-related costs, and time. This paper provides an approach to project controls that, rather than using one all inclusive comprehensive system, requires five separate monitoring systems - one for each phase of an activity's life cycle. Through the integration of these discrete but interrelated systems, utility management acquires the necessary tools for comprehensive planning and control of their modification program and effective detailed monitoring for all outage-related activities

  7. Framatome ANP outage optimization support solutions

    International Nuclear Information System (INIS)

    Bombail, Jean Paul

    2003-01-01

    Over the last several years, leading plant operators have demonstrated that availability factors can be improved while safety and reliability can be enhanced on a long-term basis and operating costs reduced. Outage optimization is the new term being used to describe these long-term initiatives through which a variety of measures aimed at shortening scheduled plant outages have been developed and successfully implemented by these leaders working with their service providers who were introducing new technologies and process improvements. Following the leaders, all operators now have ambitious outage optimization plans and the median and average outage duration are decreasing world-wide. Future objectives are even more stringent and must include plant upgrades and component replacements being performed for life extension of plant operation. Outage optimization covers a broad range of activities from modifications of plant systems to faster cool down rates to human behavior improvements. It has been proven to reduce costs, avoid unplanned outages and thus support plant availability and help to ensure the utility's competitive position in the marketplace

  8. Analysis of T101 outage radiation dose

    International Nuclear Information System (INIS)

    Li, Zhonghua

    2008-01-01

    Full text: Collective radiation dose during outage is about 80% of annual collective radiation dose at nuclear power plants (NPPs). T 101 Outage is the first four-year outage of Unit 1 at Tianwan Nuclear Power Station (TNPS) and thorough overhaul was undergone for the 105-day's duration. Therefore, T 101 Outage has significant reference meaning to reducing collective radiation dose at TNPS. This paper collects the radiation dose statistics during T 101 Outage and analyses the radiation dose distribution according to tasks, work kinds and varying trend of the collective radiation dose etc., comparing with other similar PWRs in the world. Based on the analysis this paper attempts to find out the major factors in collective radiation dose during T 101 Outage. The major positive factor is low radiation level at workplace, which profits from low content of Co in reactor construction materials, optimised high-temperature p H value of the primary circuit coolant within the tight range and reactor operation without trips within the first fuel cycle. One of the most negative factors is long outage duration and many person-hours spent in the radiological controlled zone, caused by too many tasks and inefficient work. So besides keeping good performance of reducing radioactive sources, it should be focused on how to improve implementation of work management including work selection, planning and scheduling, work preparation, work implementation, work assessment and feedback, which can lead to reduced numbers of workers needed to perform a task, of person-hours spent in the radiological controlled zone. Moreover, this leads to reduce occupational exposures in an ALARA fashion. (author)

  9. Advanced Test Reactor outage risk assessment

    International Nuclear Information System (INIS)

    Thatcher, T.A.; Atkinson, S.A.

    1997-01-01

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance

  10. Reactor refurbishment in an outage environment

    International Nuclear Information System (INIS)

    Gowthorpe, P.; Hoare, R.

    2012-01-01

    Reactor life extension has typically been performed during specific refurbishment outages. These outages are long and costly due to the sheer complexity of the scope, not to mention the ever present discovery work. A scope of this size requires a huge labour force to execute, which poses significant challenges. The work is difficult to staff with qualified people able to execute the work smoothly and managing the required labour pool problematic. Cost and time overruns are inevitable in that environment. Reducing the cost and schedule is critical to the long term viability of reactor refurbishment projects. With planning, the total cost of the refurbishment can be reduced by managing the inspection and repairs during normal outages. Identifying what activities need to be done each outage for the life of the reactor and bringing the latest technology can make this viable. Tightly planned outages with a small well trained labour force will go a long way to reducing costs. The suite of services and tooling available to the utilities to manage their reactor integrity has improved significantly in recent years and continues to evolve. New feeder inspection technologies can provide improved inspection results for the complex feeder geometry. These improvements lead to more accurate wear rates and better predictions of component life. Feeders that need replacement based on improved inspection techniques can be replaced systematically during regular outages rather than specific refurbishment outages. Targeting areas rather than entire feeders reduces time, dose and cost. In cases where feeder replacement isn't feasible or where unpredicted wear is found, a feeder weld overlay process can be used. To manage the reactor work, new data systems are under development that allow for effective tracking of each activity performed and outcomes in a single package. (author)

  11. Integrated outage management: Leveraging utility system assets including GIS and AMR for optimum outage response

    Energy Technology Data Exchange (ETDEWEB)

    Finamore, E. P.

    2004-02-01

    The control of electrical system outages is discussed. The principal argument advanced is that traditional stand-alone methods of outage response will no longer get the job done without utility companies integrating their outage management systems with other system assets such as GIS (geographic information system) and AMR (advanced metering systems). Many meter reading systems, while primarily supporting customer billing, can also provide outage alarm and some are also capable of service restoration notification, which is an invaluable benefit to service operators since it obviates the need for verifying system restoration by labour-intensive on-site visits or customer call-backs. If successfully leveraged, optimization of all utility assets and improvements in labour productivity can results in improved outage management performance gains without affecting performance in other areas.

  12. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  13. Contingency Analysis of Cascading Line Outage Events

    Energy Technology Data Exchange (ETDEWEB)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  14. Non-modal stability in Hagen-Poiseuille flow of a Bingham fluid

    Science.gov (United States)

    Liu, Rong; Liu, Qiu Sheng

    2014-01-01

    Linear stability in Hagen-Poiseuille flow of a Bingham fluid is considered. Bingham fluid exhibits a yield stress in addition to a plastic viscosity. A Bingham number B, which describes the ratio of yield and viscous stresses, is used to characterize the behavior of Bingham-Hagen-Poiseuille flow. The effects of B on the stability are investigated using the energy method and the non-modal stability theory. The energy analysis shows that the non-axisymmetric disturbance has the lowest critical energy Reynolds number for all B. The global critical energy Reynolds number Reg increases with B. At sufficient large B, Reg has the order of B1/2. For the non-modal stability, we focus on response to external excitations and initial conditions. The former is studied by examining the ɛ-pseudospectrum, and the latter is by examining the energy growth function G(t). For the problem of response to external excitations, the maximum response is achieved by non-axisymmetric and streamwise uniform disturbances at the frequency of ω = 0, with a possible choice of the azimuthal wavenumbers of n = 1, 2, or 3. For the problem of response to initial conditions, it is found that there can be a rather large transient growth even though the linear operator of the Bingham-Hagen-Poiseuille flow has no unstable eigenvalue. For small B, the optimal disturbance is in the form of streamwise uniform vortices and streaks. For large B, the optimal disturbance is in the form of oblique waves. The optimal energy growth decreases and the optimal azimuthal wavenumber increases with the increase of B.

  15. Partnership - the heart of integrated outage management

    International Nuclear Information System (INIS)

    Robinson, F.T.

    1995-01-01

    Changes in the power generating industry continue apace. The effects of privatisation are widely visible: nowhere more so than in the growing national and international competition facing the generators around the world. A successful, long-term marriage between generator and contractor on power station outage management offers significant scope for cost reduction, shortening annual plant downtime and generating more megawatts, all within a safety environment of continuous improvement. Working in close partnership, Nuclear Electric and Rolls-Royce Nuclear Engineering Services have remodelled the whole contractor/client strategy. The new discipline, known as integrated outage management and partnering, is already producing shorter outage periods at Bradwell, a Magnox Station in Essex. (author)

  16. Benchmark Report on Key Outage Attributes: An Analysis of Outage Improvement Opportunities and Priorities

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2014-09-01

    Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally do not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.

  17. Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    St. Germain, Shawn W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whaley, April M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Medema, Heather D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gertman, David I. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

  18. Standard plants, standard outages: the EdF approach

    International Nuclear Information System (INIS)

    Miron, J.L.

    1991-01-01

    At the end of 1990 Electricite de France had carried out a total of 350 PWR refuelling outages. Although the French units are standardized the routine of the outages are not all the same. The major influences on outages were: setting up new organizations to apply quality assurance regulations; improving systematic experience feedback; incorporating modifications in the outage schedules; assumilation of computerized maintenance management by the sites. (author)

  19. Residential outage cost estimation: Hong Kong

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Shiu, A.; Cheng, Y.S.; Horowitz, I.; Wang, J.

    2014-01-01

    Hong Kong has almost perfect electricity reliability, the result of substantial investments ultimately financed by electricity consumers who may be willing to accept lower reliability in exchange for lower bills. But consumers with high outage costs are likely to reject the reliability reduction. Our ordered-logit regression analysis of the responses by 1876 households to a telephone survey conducted in June 2013 indicates that Hong Kong residents exhibit a statistically-significant preference for their existing service reliability and rate. Moreover, the average residential cost estimate for a 1-h outage is US$45 (HK$350), topping the estimates reported in 10 of the 11 studies published in the last 10 years. The policy implication is that absent additional compelling evidence, Hong Kong should not reduce its service reliability. - Highlights: • Use a contingent valuation survey to obtain residential preferences for reliability. • Use an ordered logit analysis to estimate Hong Kong's residential outage costs. • Find high outage cost estimates that imply high reliability requirements. • Conclude that sans new evidence, Hong Kong should not reduce its reliability

  20. Pricing power outages in the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Baarsma, Barbara E.; Hop, J. Peter [SEO Economic Research/University of Amsterdam, Amsterdam (Netherlands)

    2009-09-15

    In most Western countries, the power grid provides electricity more than 99% of the time. To maintain reliability at such high levels, energy companies have to continually invest in electric transmission- and distribution systems. Since customers of electricity cannot switch from one distribution network to another, no economic incentive exists that matches the supplied reliability to customer preferences. Either under- or over-investment in reliability may thus result. In order to introduce market-like incentives, the Dutch Energy Regulator introduced a regulatory system based on the (perceived) costs of power outages. An essential ingredient of the regulation is the cost of a power outage of a particular duration (i.e., 1 minute). This paper measures these outage cost by using conjoint analysis. We find that the social cost of the present Dutch level of reliability - that is, one outage of two hours every four years - is EUR2.80 on average for every household, and EUR33.10 on average for every SME firm. The total costs to Dutch society are almost EUR50 million. (author)

  1. Qinshan CANDU NPP outage performance improvement through benchmarking

    International Nuclear Information System (INIS)

    Jiang Fuming

    2005-01-01

    With the increasingly fierce competition in the deregulated Energy Market, the optimization of outage duration has become one of the focal points for the Nuclear Power Plant owners around the world. People are seeking various ways to shorten the outage duration of NPP. Great efforts have been made in the Light Water Reactor (LWR) family with the concept of benchmarking and evaluation, which great reduced the outage duration and improved outage performance. The average capacity factor of LWRs has been greatly improved over the last three decades, which now is close to 90%. CANDU (Pressurized Heavy Water Reactor) stations, with its unique feature of on power refueling, of nuclear fuel remaining in the reactor all through the planned outage, have given raise to more stringent safety requirements during planned outage. In addition, the above feature gives more variations to the critical path of planned outage in different station. In order to benchmarking again the best practices in the CANDU stations, Third Qinshan Nuclear Power Company (TQNPC) have initiated the benchmarking program among the CANDU stations aiming to standardize the outage maintenance windows and optimize the outage duration. The initial benchmarking has resulted the optimization of outage duration in Qinshan CANDU NPP and the formulation of its first long-term outage plan. This paper describes the benchmarking works that have been proven to be useful for optimizing outage duration in Qinshan CANDU NPP, and the vision of further optimize the duration with joint effort from the CANDU community. (authors)

  2. Cell outage compensation in LTE networks: Algorithms and performance assessment

    NARCIS (Netherlands)

    Amirijoo, M.; Jorguseski, L.; Litjens, R.; Schmelz, L.C.

    2011-01-01

    Cell outage compensation is a self-healing function and as such part of the Self-Organising Networks concept for mobile wireless networks. It aims at mitigating the degradation of coverage, capacity and service quality caused by a cell or site level outage. Upon detection of such an outage, cell

  3. Thermal development of the laminar flow of a Bingham fluid between two plane plates with viscous dissipation

    Energy Technology Data Exchange (ETDEWEB)

    Boualit, A.; Boualit, S. [Unite de recherche appliquee en energies renouvelables, Ghardaia (Algeria); Zeraibi, N. [Universite de Boumerdes, Faculte des hydrocarbures dept. Transport et equipement, Boumerdes (Algeria); Amoura, M. [Universite des Sciences et de la Technologie Houari Boumedienne, Faculte de Physique, Dept. Energetique, Alger (Algeria)

    2011-01-15

    The thermal development of the hydrodynamically developing laminar flow of a viscoplastic fluid (fluid of Bingham) between two plane plates maintained at a constant temperature has been studied numerically. This analysis has shown the effect caused by inertia and the rheological behaviour of the fluid on the velocity, pressure and temperature fields. The effects of Bingham and Peclet numbers on the Nusselt values with the inclusion of viscous dissipation are also discussed. (authors)

  4. Influence of Parameters of Core Bingham Material on Critical Behaviour of Three-Layered Annular Plate

    Directory of Open Access Journals (Sweden)

    Pawlus Dorota

    2017-12-01

    Full Text Available The paper presents the dynamic response of annular three-layered plate subjected to loads variable in time. The plate is loaded in the plane of outer layers. The plate core has the electrorheological properties expressed by the Bingham body model. The dynamic stability loss of plate with elastic core is determined by the critical state parameters, particularly by the critical stresses. Numerous numerical observations show the influence of the values of viscosity constant and critical shear stresses, being the Bingham body parameters, on the supercritical viscous fluid plate behaviour. The problem has been solved analytically and numerically using the orthogonalization method and finite difference method. The solution includes both axisymmetric and asymmetric plate dynamic modes.

  5. ALE finite volume method for free-surface Bingham plastic fluids with general curvilinear coordinates

    International Nuclear Information System (INIS)

    Nagai, Katsuaki; Ushijima, Satoru

    2010-01-01

    A numerical prediction method has been proposed to predict Bingham plastic fluids with free-surface in a two-dimensional container. Since the linear relationships between stress tensors and strain rate tensors are not assumed for non-Newtonian fluids, the liquid motions are described with Cauchy momentum equations rather than Navier-Stokes equations. The profile of a liquid surface is represented with the two-dimensional curvilinear coordinates which are represented in each computational step on the basis of the arbitrary Lagrangian-Eulerian (ALE) method. Since the volumes of the fluid cells are transiently changed in the physical space, the geometric conservation law is applied to the finite volume discretizations. As a result, it has been shown that the present method enables us to predict reasonably the Bingham plastic fluids with free-surface in a container.

  6. ALE finite volume method for free-surface Bingham plastic fluids with general curvilinear coordinates

    Science.gov (United States)

    Nagai, Katsuaki; Ushijima, Satoru

    2010-06-01

    A numerical prediction method has been proposed to predict Bingham plastic fluids with free-surface in a two-dimensional container. Since the linear relationships between stress tensors and strain rate tensors are not assumed for non-Newtonian fluids, the liquid motions are described with Cauchy momentum equations rather than Navier-Stokes equations. The profile of a liquid surface is represented with the two-dimensional curvilinear coordinates which are represented in each computational step on the basis of the arbitrary Lagrangian-Eulerian (ALE) method. Since the volumes of the fluid cells are transiently changed in the physical space, the geometric conservation law is applied to the finite volume discretizations. As a result, it has been shown that the present method enables us to predict reasonably the Bingham plastic fluids with free-surface in a container.

  7. Bingham liquid flow between two cylinders induced by inner ring rotation

    Science.gov (United States)

    Jaroslav, Štigler; Simona, Fialová

    2017-09-01

    This paper deals with the fluid flow between two cylinders induced by inner ring rotation. The gap width between the cylinders, in case that they are both concentric, is 1mm, the gap and inner ring radius ratio 0.013 and the radius ratio 0.987. Attention is focused on rotation speed and eccentricity influence on the flow. Calculations were done for both Newtonian liquid and Bingham plastic liquid with the yield stress threshold 50 Pa.

  8. Mathematical Modeling of Bingham Plastic Model of Blood Flow Through Stenotic Vessel

    OpenAIRE

    S.R. Verma

    2014-01-01

    The aim of the present paper is to study the axially symmetric, laminar, steady, one-dimensional flow of blood through narrow stenotic vessel. Blood is considered as Bingham plastic fluid. The analytical results such as pressure drop, resistance to flow and wall shear stress have been obtained. Effect of yield stress and shape of stenosis on resistance to flow and wall shear stress have been discussed through tables and graphically. It has been shown that resistance to flow and th...

  9. Flow and Heat Transfer of Bingham Plastic Fluid over a Rotating Disk with Variable Thickness

    Science.gov (United States)

    Liu, Chunyan; Pan, Mingyang; Zheng, Liancun; Ming, Chunying; Zhang, Xinxin

    2016-11-01

    This paper studies the steady flow and heat transfer of Bingham plastic fluid over a rotating disk of finite radius with variable thickness radially in boundary layer. The boundary layer flow is caused by the rotating disk when the extra stress is greater than the yield stress of the Bingham fluid. The analyses of the velocity and temperature field related to the variable thickness disk have not been investigated in current literatures. The governing equations are first simplified into ordinary differential equations owing to the generalized von Kármán transformation for seeking solutions easily. Then semi-similarity approximate analytical solutions are obtained by using the homotopy analysis method for different physical parameters. It is found that the Bingham number clearly influences the velocity field distribution, and the skin friction coefficient Cfr is nonlinear growth with respect to the shape parameter m. Additionally, the effects of the involved parameters (i.e. shape parameter m, variable thickness parameter β, Reynolds number Rev, and Prandtl number Pr) on velocity and temperature distribution are investigated and analyzed in detail.

  10. Acoustic heating produced in the thermoviscous flow of a Bingham plastic

    Science.gov (United States)

    Perelomova, Anna

    2011-02-01

    This study is devoted to the instantaneous acoustic heating of a Bingham plastic. The model of the Bingham plastic's viscous stress tensor includes the yield stress along with the shear viscosity, which differentiates a Bingham plastic from a viscous Newtonian fluid. A special linear combination of the conservation equations in differential form makes it possible to reduce all acoustic terms in the linear part of of the final equation governing acoustic heating, and to retain those belonging to the thermal mode. The nonlinear terms of the final equation are a result of interaction between sounds and the thermal mode. In the field of intense sound, the resulting nonlinear acoustic terms form a driving force for the heating. The final governing dynamic equation of the thermal mode is valid in a weakly nonlinear flow. It is instantaneous, and does not imply that sounds be periodic. The equations governing the dynamics of both sounds and the thermal mode depend on sign of the shear rate. An example of the propagation of a bipolar initially acoustic pulse and the evolution of the heating induced by it is illustrated and discussed.

  11. Nuclear safety risk control in the outage of CANDU unit

    International Nuclear Information System (INIS)

    Wu Mingliang; Zheng Jianhua

    2014-01-01

    Nuclear fuel remains in the core during the outage of CANDU unit, but there are still nuclear safety risks such as reactor accidental criticality, fuel element failure due to inability to properly remove residual heat. Furthermore, these risks are aggravated by the weakening plant system configuration and multiple cross operations during the outage. This paper analyzes the phases where there are potential nuclear safety risks on the basis of the typical critical path arrangement of the outage of Qinshan NPP 3 and introduces a series of CANDU-specific risk control measures taken during the past plant outages to ensure nuclear safety during the unit outage. (authors)

  12. Sodium pumping: pump problems

    International Nuclear Information System (INIS)

    Guer, M.; Guiton, P.

    Information on sodium pumps for LMFBR type reactors is presented concerning ring pump design, pool reactor pump design, secondary pumps, sodium bearings, swivel joints of the oscillating annulus, and thermal shock loads

  13. Excellence through outage planning and scheduling

    International Nuclear Information System (INIS)

    Ferriole, G.

    1987-01-01

    The Nuclear and Fossil Generation Division of Electricite de France (EdF) has been the largest nuclear plant operating utility in France since 1984. The size of the units, their standardization, and extensive operating experience were favorable parameters leading to the development of a very complete maintenance organization. Electricite de France believes in the importance of well-defined maintenance concepts. These maintenance concepts contribute to outage performance by requiring a careful consideration of work to be done and by defining the techniques and means of accomplishing this work. In addition to maintenance concepts and careful planning and scheduling, good outage management is achieved through the motivation and dedication of the people involved. It is the key to good operational results

  14. Programming and organisation of unit outages

    International Nuclear Information System (INIS)

    Hadjidakis, Y.; Cezard, C.; Audierne, J.

    1997-01-01

    The unit outages are scheduled every 12 to 18 months for fuel reloading. The success of these shutdowns, with the whole of objectives (duration, dosimetry, costs), with maintaining the safety level, is an important stake for the competitiveness of the enterprise. In this article are described the planning, the experience return and the organisation of scheduled shutdowns which have contribute to the improvement of availability. (N.C.)

  15. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby

    2012-05-01

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage

  16. Long-term optimization of outage performance

    International Nuclear Information System (INIS)

    Huemmeler, Alexander; Jakobs, Norbert; Seifert, Siegfried

    2003-01-01

    Deregulation of the power markets and the accompanying pressure on electricity prices have forced all electric utilities to reduce their power generating costs in order to be able to hold their own in the new market environment. This has also particularly affected the operators of nuclear power plants since they have to compete against the lower power generating costs of fossil-fired combined-cycle power plants and, in Germany are faced with a difficult political climate. The areas identified as having the greatest cost-cutting potential were fuel costs, operating costs and measures to increase plant availability. The main objective behind increasing plant availability was not only to improve the already high standard of operational reliability and plant safety even further, but also to significantly shorten the downtime needed for annual refueling outages. A variety of measures aimed at shortening scheduled plant outages have thus been developed and successfully implemented by nuclear plant operators. At the same time, process improvements and new technologies have been introduced by the service providers. Both initiatives together have contributed towards substantially reducing outage time and cost. (author)

  17. Optimization of safety equipment outages improves safety

    International Nuclear Information System (INIS)

    Cepin, Marko

    2002-01-01

    Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one

  18. How individual traces and interactive timelines could support outage execution - Toward an outage historian concept

    International Nuclear Information System (INIS)

    Parfouru, S.; De-Beler, N.

    2012-01-01

    In the context of a project that is designing innovative ICT-based solutions for the organizational concept of outage management, we focus on the informational process of the OCR (Outage Control Room) underlying the execution of the outages. Informational process are based on structured and unstructured documents that have a key role in the collaborative processes and management of the outage. We especially track the structured and unstructured documents, electronically or not, from creation to sharing. Our analysis allows us to consider that the individual traces produced by an individual participant with a specific role could be multi-purpose and support sharing between participants without creating duplication of work. The ultimate goal is to be able to generate an outage historian, that is not just focused on highly structured information, which could be useful to improve the continuity of information between participants. We study the implementation of this approach through web technologies and social media tools to address this issue. We also investigate the issue of data access through interactive visualization timelines coupled with other modality's to assist users in the navigation and exploration of the proposed historian. (authors)

  19. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    2006-04-01

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  20. Three-dimensional simulations of Bingham plastic flows with the multiple-relaxation-time lattice Boltzmann model

    Directory of Open Access Journals (Sweden)

    Song-Gui Chen

    2016-01-01

    Full Text Available This paper presents a three-dimensional (3D parallel multiple-relaxation-time lattice Boltzmann model (MRT-LBM for Bingham plastics which overcomes numerical instabilities in the simulation of non-Newtonian fluids for the Bhatnagar–Gross–Krook (BGK model. The MRT-LBM and several related mathematical models are briefly described. Papanastasiou’s modified model is incorporated for better numerical stability. The impact of the relaxation parameters of the model is studied in detail. The MRT-LBM is then validated through a benchmark problem: a 3D steady Poiseuille flow. The results from the numerical simulations are consistent with those derived analytically which indicates that the MRT-LBM effectively simulates Bingham fluids but with better stability. A parallel MRT-LBM framework is introduced, and the parallel efficiency is tested through a simple case. The MRT-LBM is shown to be appropriate for parallel implementation and to have high efficiency. Finally, a Bingham fluid flowing past a square-based prism with a fixed sphere is simulated. It is found the drag coefficient is a function of both Reynolds number (Re and Bingham number (Bn. These results reveal the flow behavior of Bingham plastics.

  1. Application of the optimal homotopy asymptotic method to nonlinear Bingham fluid dampers

    Directory of Open Access Journals (Sweden)

    Marinca Vasile

    2017-10-01

    Full Text Available Dynamic response time is an important feature for determining the performance of magnetorheological (MR dampers in practical civil engineering applications. The objective of this paper is to show how to use the Optimal Homotopy Asymptotic Method (OHAM to give approximate analytical solutions of the nonlinear differential equation of a modified Bingham model with non-viscous exponential damping. Our procedure does not depend upon small parameters and provides us with a convenient way to optimally control the convergence of the approximate solutions. OHAM is very efficient in practice for ensuring very rapid convergence of the solution after only one iteration and with a small number of steps.

  2. Application of the optimal homotopy asymptotic method to nonlinear Bingham fluid dampers

    Science.gov (United States)

    Marinca, Vasile; Ene, Remus-Daniel; Bereteu, Liviu

    2017-10-01

    Dynamic response time is an important feature for determining the performance of magnetorheological (MR) dampers in practical civil engineering applications. The objective of this paper is to show how to use the Optimal Homotopy Asymptotic Method (OHAM) to give approximate analytical solutions of the nonlinear differential equation of a modified Bingham model with non-viscous exponential damping. Our procedure does not depend upon small parameters and provides us with a convenient way to optimally control the convergence of the approximate solutions. OHAM is very efficient in practice for ensuring very rapid convergence of the solution after only one iteration and with a small number of steps.

  3. Fluid boundary of a viscoplastic Bingham flow for finite solid deformations

    OpenAIRE

    Thual , Olivier; Lacaze , Laurent

    2010-01-01

    International audience; The modelling of viscoplastic Bingham fluids often relies on a rheological constitutive law based on a "plastic rule function" often identical to the yield criterion of the solid state. It is also often assumed that this plastic rule function vanishes at the boundary between the solid and fluid states, based on the fact that it is true in the limit of small deformations of the solid state or for simple yield criteria. We show that this is not the case for finite deform...

  4. Peristaltic transport of Bingham plastic fluid considering magnetic field, Soret and Dufour effects

    Science.gov (United States)

    Hayat, T.; Farooq, S.; Mustafa, M.; Ahmad, B.

    Current attempt addresses the peristaltic transport of Bingham plastic fluid under the influence of magnetic force. Space dependent viscosity is considered. Novel Soret and Dufour effects are retained in the mathematical model. Problem formulation is presented through the conventional lubrication approach. Series solutions of the arising non-linear problem are developed via regular perturbation approach. Special attention is given to the role of embedded parameters on the axial velocity, temperature, concentration and pressure distributions. Furthermore the numerical solution of pressure rise per wavelength is obtained through numerical integration because its analytical solution seems impossible.

  5. Approach to shortening duration of nuclear plant refueling outage

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Yoshiharu; Nakanishi, Tooru [Mitsubishi Heavy Industries Ltd., Kobe (Japan). Kobe Shipyard and Machinery Works; Yoshihara, Seiichi; Kanbara, Masayuki; Yamanaka, Misao; Shimizu, Takeshi

    1998-07-01

    This paper summarizes the mission role of the MHI in-house project team for a shorter outage duration for PWR plants operating in Japan and its results. The major tasks of project team are benchmarking to develop outage performance goals, and develop recommendation packages for outage enhancement covering field procedures and tooling betterment. An optimization study for maintenance tasks was also carried out. This paper highlights the results of efforts the activities of the project team. (author)

  6. Unit availability not affected by extending outage cycles

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D.J.

    2003-03-01

    To improve their economic dispatch position, more and more plant owners are extending the intervals between major outages for boilers from one year to 18-24 months and for steam turbine up to 12 years. In many instances, extended outage cycles have resulted in no loss in availability or increases in forced outages. The article discusses outage scheduling at Tucson Electric Power's Springville coal-fired plant, the Panther Creek Energy Facility in Pennsylvania, and at Tennessee Valley Authority's coal-fired power plants. 1 fig.

  7. Outage Risk Assessment and Management (ORAM) technology to improve outage safety and economics

    International Nuclear Information System (INIS)

    Kalra, S.P.

    2004-01-01

    The Electric Power Research Institute (EPRI) has undertaken an aggressive program, called ORAM (Outage Risk Assessment and Management), to provide utilities with tools and technology to assist in managing risk during the planning and conduct of outages. The ORAM program consists of the following 6 steps: i) Perform utility surveys and visits on shutdown risk management needs, ii) Perform probabilistic shutdown safety assessments (PSSAs) to identify generic insights that can be incorporated into risk management guidelines and identify selected areas for the development of contingency actions, iii) Develop risk management guidelines (RMG's) that provide a systematic approach to the planning and conduct of outages from a safety perspective. Incorporate insights from the shutdown safety assessments and other operating experience into the RMG's. iv) Develop selected contingency actions including a thermalhydraulic tool kit to address higher risk time periods and activities identified in the shutdown safety assessments, v) Develop computer software that integrates all of the above capability into an easy to use tool for effective shutdown operation management for utilities, vi) Provide assistance in the transfer of this technology and the application of these tools. This paper briefly describes the technical approach and tools developed under EPRI's ORAM program and its applications for improving outage safety and economics. (author)

  8. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  9. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    International Nuclear Information System (INIS)

    Kosonen, M.; Hakola, M.

    2012-01-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  10. Augmented Lagrangian methods to solve Navier-Stokes equations for a Bingham fluid flow

    International Nuclear Information System (INIS)

    Boscardin, Laetitia

    1999-01-01

    The objective of this research thesis is to develop one or more methods for the numerical resolution of equations of movement obtained for a Bingham fluid. The resolution of Navier-Stokes equations is processed by splitting elliptic and hyperbolic operators (Galerkin transport). In this purpose, the author first studied the Stokes problem, and then addressed issues of stability and consistency of the global scheme. The variational formulation of the Stokes problem can be expressed under the form of a minimisation problem under the constraint of non linear and non differentiable functions. Then, the author proposes a discretization of the Stokes problem based on a hybrid finite element method. Then he extends the demonstrations of stability and consistency of the Galerkin-transport scheme which have been established for a Newtonian fluid, to the case of a Bingham fluid. A relaxation algorithm and a Newton-GMRES algorithm are developed to solve the problem, and their convergence is studied. To ensure this convergence, some constraints must be verified. In order to do so, a specific speed element has been developed [fr

  11. Impact cratering experiments in Bingham materials and the morphology of craters on Mars and Ganymede

    Science.gov (United States)

    Fink, J. H.; Greeley, R.; Gault, D. E.

    1982-01-01

    Results from a series of laboratory impacts into clay slurry targets are compared with photographs of impact craters on Mars and Ganymede. The interior and ejecta lobe morphology of rampart-type craters, as well as the progression of crater forms seen with increasing diameter on both Mars and Ganymede, are equalitatively explained by a model for impact into Bingham materials. For increasing impact energies and constant target rheology, laboratory craters exhibit a morphologic progression from bowl-shaped forms that are typical of dry planetary surfaces to craters with ejecta flow lobes and decreasing interior relief, characteristic of more volatile-rich planets. A similar sequence is seen for uniform impact energy in slurries of decreasing yield strength. The planetary progressions are explained by assuming that volatile-rich or icy planetary surfaces behave locally in the same way as Bingham materials and produce ejecta slurries with yield strenghs and viscosities comparable to terrestrial debris flows. Hypothetical impact into Mars and Ganymede are compared, and it is concluded that less ejecta would be produced on Ganymede owing to its lower gravitational acceleration, surface temperature, and density of surface materials.

  12. Outage analysis of blind cooperative diversity

    KAUST Repository

    Tourki, Kamel; Alouini, Mohamed-Slim

    2011-01-01

    Mobile users with single antennas can still take advantage of spatial diversity through cooperative space-time-encoded transmission. In this paper, we considered a scheme in which a relay chooses to cooperate only if its source-relay channel is of an acceptable quality, and we evaluate the usefulness of relaying when the source acts blindly and ignores the decision of the relays whether they may cooperate or not. In our study, we consider the regenerative relays in which the decisions to cooperate are based on a targeted end-to-end data rate R. We derived the end-to-end outage probability for a transmission rate R and a code rate ρ and look at a power allocation strategy between the source and the relays in order to minimize the end-to-end outage probability at the destination for high signal-to-noise ratio, by using the golden section search method. Performance results show that the computer simulations-based results coincide with our analytical results. Copyright © 2011 John Wiley & Sons, Ltd.

  13. Outage analysis of blind cooperative diversity

    KAUST Repository

    Tourki, Kamel

    2011-06-06

    Mobile users with single antennas can still take advantage of spatial diversity through cooperative space-time-encoded transmission. In this paper, we considered a scheme in which a relay chooses to cooperate only if its source-relay channel is of an acceptable quality, and we evaluate the usefulness of relaying when the source acts blindly and ignores the decision of the relays whether they may cooperate or not. In our study, we consider the regenerative relays in which the decisions to cooperate are based on a targeted end-to-end data rate R. We derived the end-to-end outage probability for a transmission rate R and a code rate ρ and look at a power allocation strategy between the source and the relays in order to minimize the end-to-end outage probability at the destination for high signal-to-noise ratio, by using the golden section search method. Performance results show that the computer simulations-based results coincide with our analytical results. Copyright © 2011 John Wiley & Sons, Ltd.

  14. Outage time reduction in GKN II without loss of safety

    International Nuclear Information System (INIS)

    Sturm, J.

    1999-01-01

    GKN II is a 1340 MWE 4-loop pressurised water reactor from Siemens KONVOI type, located in the south of Germany. It was originally connected to the grid at the end of 1988. Commercial operation under utility responsibility started at the second half of 1989. The first outage was performed in 1990. Beginning from this date, the outage duration was contiguously reduced from 33 days to 15 days in 1996. In 1998, two refueling and maintenance outages were performed, each with a duration of 7 days. Key planning factors to achieve these results are: A well adapted planning organisation with an outage manager and an outage planning team. An effective long term planning. This means the combination of work with a long duration every 4 or 8 years. No longlasting work in the years in between. Main work only on one safety train per year. Optimisation and standardisation of the shutdown and the startup sequence. The real change of reactor states have been modified, compared to the vendor recommendations. An tests are assigned to plant conditions, where they are most effective and are less time critical. Small modifications in the plant, mainly on the auxiliary systems, to speedup some sequences. Extreme detailed planning of maintenance and periodic tests. Each work/test can be found in a detailed schedule with a dedicated time widow. Optimized tools to perform the detailed planning and to implement the feedback of experience from former outages. Optimized tools for maintenance and handlings of heavy equipment on the critical path. Optimized tools to perform periodic tests. Key factors during outage are: Permanent control of the schedules with an updated 3-day program. Best and permanent information with this 3-day program of all people that are involved. Fast reaction on delays. Outage managers permanent on site. Gain in safety during shutdown states, with reduced outage duration: It has to be proven, that short outages don't lead to faster and less accurate work. It can be

  15. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  16. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    International Nuclear Information System (INIS)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-01-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  17. Line outage contingency analysis including the system islanding ...

    African Journals Online (AJOL)

    The optimally ordered sparse [Bʹ], [Bʺ] matrices for the integrated system are used for load flow analysis to determine modified values of voltage phase angles [d] and bus voltages [V] to determine the over loading effect on the remaining lines due to outage of a selected line outage contingency. In case of over loading in ...

  18. Evaluation of the Planned Outage Durations in EU-APR

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Byung Joon; Lee, Keun Sung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    EU-APR has been designed to comply with European Utility Requirements (EUR) and nuclear design requirements of the European countries. And it is modified and improved from its original design of APR1400. The whole duration varies depending on items for additional process. Refueling and regular maintenance outage is comprised of basic processes and Main turbine-generator outage includes dismantling inspection of main generator and high pressure turbine as a critical path in addition to basic processes. In-Service Inspection Outage includes Automatic ultrasonic inspection on the upper side/lower side of a nuclear reactor as a critical path in addition to basic processes. The planned outage durations of EU-APR are optimized according to the above results. And they are complied with EUR Requirement (EUR 2.2.7.2.2 B), respectively. In addition, outage duration can be reduced with improved operating technology and more maintenance friendly environment including betterment of filling, drain and ventilation.

  19. Evaluation of the Planned Outage Durations in EU-APR

    International Nuclear Information System (INIS)

    Jung, Byung Joon; Lee, Keun Sung

    2016-01-01

    EU-APR has been designed to comply with European Utility Requirements (EUR) and nuclear design requirements of the European countries. And it is modified and improved from its original design of APR1400. The whole duration varies depending on items for additional process. Refueling and regular maintenance outage is comprised of basic processes and Main turbine-generator outage includes dismantling inspection of main generator and high pressure turbine as a critical path in addition to basic processes. In-Service Inspection Outage includes Automatic ultrasonic inspection on the upper side/lower side of a nuclear reactor as a critical path in addition to basic processes. The planned outage durations of EU-APR are optimized according to the above results. And they are complied with EUR Requirement (EUR 2.2.7.2.2 B), respectively. In addition, outage duration can be reduced with improved operating technology and more maintenance friendly environment including betterment of filling, drain and ventilation

  20. Analysis of scrams and forced outages at boiling water reactors

    International Nuclear Information System (INIS)

    Earle, R.T.; Sullivan, W.P.; Miller, K.R.; Schwegman, W.J.

    1980-07-01

    This report documents the results of a study of scrams and forced outages at General Electric Boiling Water Reactors (BWRs) operating in the United States. This study was conducted for Sandia Laboratories under a Light Water Reactor Safety Program which it manages for the United States Department of Energy. Operating plant data were used to identify the causes of scrams and forced outages. Causes of scrams and forced outages have been summarized as a function of operating plant and plant age and also ranked according to the number of events per year, outage time per year, and outage time per event. From this ranking, identified potential improvement opportunities were evaluated to determine the associated benefits and impact on plant availability

  1. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  2. On a solvability of hydro-mechanical problem based on contact problem with visco-plastic friction in Bingham rheology

    Czech Academy of Sciences Publication Activity Database

    Nedoma, Jiří; Tomášek, Luboš

    2008-01-01

    Roč. 218, č. 1 (2008), s. 116-124 ISSN 0377-0427 Institutional research plan: CEZ:AV0Z10300504 Keywords : visco-plasticity * Bingham rheology * contact problems with friction * variational inequalities * FEM * geomechanics * hydromechanics Subject RIV: BA - General Mathematics Impact factor: 1.048, year: 2008

  3. 77 FR 21835 - Savage, Bingham & Garfield Railroad Company-Trackage Rights Exemption-Elgin, Joliet and Eastern...

    Science.gov (United States)

    2012-04-11

    ... (CN),\\1\\ has agreed to grant limited overhead trackage rights to Savage, Bingham & Garfield Railroad Company (SBG) over approximately 0.6 miles of rail line between milepost J 47.4 (south end of CN's Whiting Yard) and Bridge Number 631 at or near milepost J 46.8 on CN's Calumet Spur on CN's Matteson...

  4. On a Solvability of Contact Problems with Visco-Plastic Friction in the Thermo-Visco-Plastic Bingham Rheology

    Czech Academy of Sciences Publication Activity Database

    Nedoma, Jiří

    2006-01-01

    Roč. 22, č. 4 (2006), s. 484-499 ISSN 0167-739X Institutional research plan: CEZ:AV0Z10300504 Keywords : unilateral contact problem * local visco- plastic friction * thermo-visco- plastic Bingham rheology * FEM Subject RIV: BA - General Mathematics Impact factor: 0.722, year: 2006

  5. Study of blades inclination influence of gate impeller with a non-Newtonian fluid of Bingham

    Directory of Open Access Journals (Sweden)

    Rahmani Lakhdar

    2016-01-01

    Full Text Available A large number of chemical operations, biochemical or petrochemical industry is very depending on the rheological fluids nature. In this work, we study the case of highly viscous of viscoplastic fluids in a classical system of agitation: a cylindrical tank with plate bottom without obstacles agitated by gate impeller agitator. We are interested to the laminar, incompressible and isothermal flows. We devote to a numerical approach carried out using an industrial code CFD Fluent 6.3.26 based on the method of finites volumes discretization of Navier - Stokes equations formulated in variables (U.V.P. The threshold of flow related to the viscoplastic behavior is modeled by a theoretical law of Bingham. The results obtained are used to compare between the five configurations suggested of power consumption. We study the influence of inertia by the variation of Reynolds number.

  6. Generation of the vorticity mode by sound in a Bingham plastic

    Science.gov (United States)

    Perelomova, Anna; Wojda, Pawel

    2011-10-01

    This study investigates interaction between acoustic and non-acoustic modes, such as vorticity mode, in some class of a non-newtonian fluid called Bingham plastic. The instantaneous equations describing interaction between different modes are derived. The attention is paid to the nonlinear effects in the field of intense sound. The resulting equations which describe dynamics of both sound and the vorticity mode apply to both periodic and aperiodic sound of any waveform. They use only instantaneous quantities and do not imply averaging over the sound period. The theory is illustrated by an example of acoustic force of vorticity induced in the field of a Gaussian sound beam. Some unusual peculiarities in both sound and the vorticity induced in its field as compared to a newtonian fluid, are discovered.

  7. Thermal convection of a viscoplastic liquid with high Rayleigh and Bingham numbers

    Science.gov (United States)

    Vikhansky, A.

    2009-10-01

    We consider the effect of yield stress on the Rayleigh-Bénard convection of a viscoplastic material. First we consider the model problem of convection in a differentially heated loop, which is described by the (modified) Lorenz equations. The presence of the yield stress significantly alters the dynamics of the system. In particular, the chaotic motion can stop suddenly (sometimes, after a period of chaotic oscillations). Guided by the model equations we performed direct numerical simulations of convection of the Bingham liquid in a square cavity heated from bellow. Our interest has been concentrated on the situation when both buoyancy and plastic forces are large. The obtained results are in a reasonable agreement with the predictions by the Lorenz equations.

  8. A Bingham-plastic model for fluid mud transport under waves and currents

    Science.gov (United States)

    Liu, Chun-rong; Wu, Bo; Huhe, Ao-de

    2014-04-01

    Simplified equations of fluid mud motion, which is described as Bingham-Plastic model under waves and currents, are presented by order analysis. The simplified equations are non-linear ordinary differential equations which are solved by hybrid numerical-analytical technique. As the computational cost is very low, the effects of wave current parameters and fluid mud properties on the transportation velocity of the fluid mud are studied systematically. It is found that the fluid mud can move toward one direction even if the shear stress acting on the fluid mud bed is much smaller than the fluid mud yield stress under the condition of wave and current coexistence. Experiments of the fluid mud motion under current with fluctuation water surface are carried out. The fluid mud transportation velocity predicted by the presented mathematical model can roughly match that measured in experiments.

  9. Effect of confinement on forced convection from a heated sphere in Bingham plastic fluids

    Science.gov (United States)

    Das, Pradipta K.; Gupta, Anoop K.; Nirmalkar, Neelkanth; Chhabra, Raj P.

    2015-05-01

    In this work, the momentum and heat transfer characteristics of a heated sphere in tubes filled with Bingham plastic fluids have been studied. The governing differential equations (continuity, momentum and thermal energy) have been solved numerically over wide ranges of conditions as: Reynolds number, 1 ≤ Re ≤ 100; Prandtl number, 1 ≤ Pr ≤ 100; Bingham number, 0 ≤ Bn ≤ 100 and blockage ratio,0 ≤ λ ≤ 0.5 where λ is defined as the ratio of the sphere to tube diameter. Over this range of conditions, the flow is expected to be axisymmetric and steady. The detailed flow and temperature fields in the vicinity of the surface of the sphere are examined in terms of the streamline and isotherm contours respectively. Further insights are developed in terms of the distribution of the local Nusselt number along the surface of the sphere together with their average values in terms of mean Nusselt number. Finally, the wall effects on drag are present only when the fluid-like region intersects with the boundary wall. However, heat transfer is always influenced by the wall effects. Also, the flow domain is mapped in terms of the yielded- (fluid-like) and unyielded (solid-like) sub-regions. The fluid inertia tends to promote yielding whereas the yield stress counters it. Furthermore, the introduction of even a small degree of yield stress imparts stability to the flow and therefore, the flow remains attached to the surface of the sphere up to much higher values of the Reynolds number than that in Newtonian fluids. The paper is concluded by developing predictive correlations for drag and Nusselt number.

  10. Technology Integration Initiative In Support of Outage Management

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby; David Gertman

    2012-07-01

    Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980’s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

  11. Extended layup of steam generators during a refurbishment outage

    International Nuclear Information System (INIS)

    Marks, C.R.; Little, M.D.; Slade, J.; Gendron, T.

    2009-01-01

    In May 2008, Point Lepreau Generating Station (PLGS), owned and operated by New Brunswick Power Nuclear (NBPN), entered an extended refurbishment outage initially expected to last approximately 18 months. NBPN had the two inter-related goals with respect to layup of the steam generators during this period: equipment preservation and inspection interval modification. The steam generators were to be preserved such that there was no loss of operating life due to corrosion of either the tubing (Alloy 800NG) or other internal components (with carbon steel being the limiting material with respect to corrosion). Additionally, NBPN desired that the time in layup not count as operating time in setting the schedule for future inspections. That is, a key goal of the steam generator layup is that the future inspection interval be based on operating time, not calendar time. The NBPN approach consists of the following four steps: A review of industry operating experience with long outages (including both PWRs and PHWRs); The development of technically based layup strategies and procedures; A mid-outage review of the implementation of the layup strategies and procedures; and A post-outage review to determine if the actual conditions in the steam generators will support modification of the inspection interval. This paper discusses the results of the first three of these steps. At this time, the plant is still in the refurbishment outage. Throughout the outage evaluation process, the following issues have been the main focus of the reviews: The potential for degradation (pitting and cracking) of steam generator tubes; The potential for general corrosion of carbon and low alloy steel internals; Oxidation of deposits (which could subsequently lead to oxidizing conditions during operation, possibly leading to tube degradation). This paper discusses the industry operating experience reviewed, the pre-outage assessments, and the mid-outage assessments. Current outage planning places the

  12. Maintenance, outages and chemistry really can be compatible

    International Nuclear Information System (INIS)

    Roberts, J.G.; Deaconescu, R.

    2006-01-01

    'Full text:' In their address to the Canadian Nuclear Society, Bruce Power's Chemistry Design staff will describe how maintenance and outages can impact negatively on chemistry control and asset protection. Considerations of material impacts and material condition have significant influences on the approach to, and control of, chemistry. This applies equally to operation as it does during unit and/or system outages. Ideas will be presented as to how to facilitate making maintenance, outages and chemistry compatible. It will be shown how the lack of such an approach can lead to disastrous results. (author)

  13. Maintenance, outages and chemistry really can be compatible

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J.G.; Deaconescu, R. [Bruce Power, Tiverton, Ontario (Canada)

    2006-07-01

    'Full text:' In their address to the Canadian Nuclear Society, Bruce Power's Chemistry Design staff will describe how maintenance and outages can impact negatively on chemistry control and asset protection. Considerations of material impacts and material condition have significant influences on the approach to, and control of, chemistry. This applies equally to operation as it does during unit and/or system outages. Ideas will be presented as to how to facilitate making maintenance, outages and chemistry compatible. It will be shown how the lack of such an approach can lead to disastrous results. (author)

  14. Saving doses by outage planning strategy and architectural arrangements

    International Nuclear Information System (INIS)

    Wahlstroem, B.

    1993-01-01

    All radiation doses come out as a result of dose rate and exposure time, and the main part of the occupational exposure is caused during outages. While every reasonable attempt should be made to lower the dose rates, the other factor, the exposure time, may not be forgotten. The paper presents possible ways of saving man-hours in the controlled zone by outage planning strategy. And every saved man-hour means a saved radiation dose. At Loviisa NPS also some special architectural arrangements contribute to shortening the outage time, thus saving doses

  15. Outage Analysis of Asymmetric RF-FSO Systems

    KAUST Repository

    Ansari, Imran Shafique; Abdallah, Mohamed M.; Alouini, Mohamed-Slim; Qaraqe, Khalid A.

    2017-01-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channels cascaded with free-space optical (FSO) links is presented. The RF links are modeled by the Rayleigh fading

  16. Outage performance of cognitive radio systems with Improper Gaussian signaling

    KAUST Repository

    Amin, Osama

    2015-06-14

    Improper Gaussian signaling has proved its ability to improve the achievable rate of the systems that suffer from interference compared with proper Gaussian signaling. In this paper, we first study impact of improper Gaussian signaling on the performance of the cognitive radio system by analyzing the outage probability of both the primary user (PU) and the secondary user (SU). We derive exact expression of the SU outage probability and upper and lower bounds for the PU outage probability. Then, we design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the proposed bounds and adaptive algorithms by numerical results.

  17. Good practices for outage management in nuclear power plants

    International Nuclear Information System (INIS)

    1991-09-01

    As a follow-up to an earlier Technical Document on Good Practices for Improved Nuclear Power Plant Performance (IAEA-TECDOC-498), the Agency has produced a more focused technical report on good practices associated with nuclear power plant outage planning and execution. As with the earlier document, the overall aim is that by identifying good practices in the key aspects of outage management, overall world nuclear performance will improve and the gap between excellent performers and operators with developing programmes will be narrowed. This document has been produced through the contribution of numerous operators and government agencies. It aims at minimizing text and focusing on actual good practices in use which can be found in the annexes. While the specific methods used to achieve excellence in maintenance/refuelling outages may differ, the fundamental requirements of outage management are discussed

  18. Outage performance of cognitive radio systems with Improper Gaussian signaling

    KAUST Repository

    Amin, Osama; Abediseid, Walid; Alouini, Mohamed-Slim

    2015-01-01

    design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the proposed bounds and adaptive algorithms by numerical

  19. The four ''Ps'' of outage management

    International Nuclear Information System (INIS)

    Kuehn, S.E.

    1996-01-01

    This article describes how planning, partnering, preparation and people prevent poor outage performance. Boasting the best production costs in a decade, the US fleet of nuclear reactors is performing better than ever. Industry wide, production costs fell 7% to $20.02 per net megawatt hour (MWh) and output climbed 3% to 634million MWh. It doesn't take a nuclear physicists to realize that when base-loaded nuclear units are operated for long periods of time, near their technical potential, costs will fall and relative performance improves. Statistics for 1994 compiled by the Institute of Nuclear Operations (INPO) and the World Association of Nuclear Operators (WANO) showed the industry has steadily improved in most of the 10 industry-recognized categories. In 1994, Unit Capability Factor (the percentage of maximum energy generation a plant can supply to the grid) reached just under 82%, beating the 1995 goal and proving just how far the industry has come (62.7% in 1980) when improving plant operations

  20. Predicting Power Outages Using Multi-Model Ensemble Forecasts

    Science.gov (United States)

    Cerrai, D.; Anagnostou, E. N.; Yang, J.; Astitha, M.

    2017-12-01

    Power outages affect every year millions of people in the United States, affecting the economy and conditioning the everyday life. An Outage Prediction Model (OPM) has been developed at the University of Connecticut for helping utilities to quickly restore outages and to limit their adverse consequences on the population. The OPM, operational since 2015, combines several non-parametric machine learning (ML) models that use historical weather storm simulations and high-resolution weather forecasts, satellite remote sensing data, and infrastructure and land cover data to predict the number and spatial distribution of power outages. A new methodology, developed for improving the outage model performances by combining weather- and soil-related variables using three different weather models (WRF 3.7, WRF 3.8 and RAMS/ICLAMS), will be presented in this study. First, we will present a performance evaluation of each model variable, by comparing historical weather analyses with station data or reanalysis over the entire storm data set. Hence, each variable of the new outage model version is extracted from the best performing weather model for that variable, and sensitivity tests are performed for investigating the most efficient variable combination for outage prediction purposes. Despite that the final variables combination is extracted from different weather models, this ensemble based on multi-weather forcing and multi-statistical model power outage prediction outperforms the currently operational OPM version that is based on a single weather forcing variable (WRF 3.7), because each model component is the closest to the actual atmospheric state.

  1. Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Shawn St. Germain; Ronald Farris; Heather Medeman

    2013-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near

  2. Evolution of an outage management organization in a small utility

    International Nuclear Information System (INIS)

    Oubre, R.P.; Shetler, J.

    1985-01-01

    Six refueling outages with a number of major equipment failure outages have taught Rancho Seco management three main items. One is that a dedicated management organization must be formed for the purpose of controlling work functions at Rancho Seco. This dedicated organization must have the experience of the plant and not have the responsibility for the actual maintenance. Second, upper management within a power plant must get directly involved in the outage. Upper management must show their presence, give input, and be available when needed. The third item learned is that the scheduling organization must be adequately staffed. Although Rancho Seco completed a refueling outage in 1978 within only 36 days, additional inspection requirements due to regulatory changes and/or previous equipment failures requiring follow-up actions would place the shortest possible outage today at approx.70 days. The only way an organization can keep this outage time down is with the proper scheduling of the resources and the timely coordination of activities to reduce conflicts

  3. Development of an Overview Display to Allow Advanced Outage Control Center Management to Quickly Evaluate Outage Status

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hugo, Jacques Victor [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    This report describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations.

  4. ethod of straight lines for a Bingham problem as a model for the flow of waxy crude oils

    Directory of Open Access Journals (Sweden)

    German Ariel Torres

    2005-11-01

    Full Text Available In this work, we develop a method of straight lines for solving a Bingham problem that models the flow of waxy crude oils. The model describes the flow of mineral oils with a high content of paraffin at temperatures below the cloud point (i.e. the crystallization temperature of paraffin and more specifically below the pour point at which the crystals aggregate themselves and the oil takes a jell-like structure. From the rheological point of view such a system can be modelled as a Bingham fluid whose parameters evolve according to the volume fractions of crystallized paraffin and the aggregation degree of crystals. We prove that the method is well defined for all times, a monotone property, qualitative behaviour of the solution, and a convergence theorem. The results are compared with numerical experiments at the end of this article.

  5. A perturbation model for the oscillatory flow of a Bingham plastic in rigid and periodically displaced tubes.

    Science.gov (United States)

    De Chant, L J

    1999-10-01

    An approximate analytical model for the pulsatile flow of an ideal Bingham plastic fluid in both a rigid and a periodically displaced tube has been developed using regular perturbation methods. Relationships are derived for the velocity field and dimensionless flow rate. The solution compares adequately with available experimentally measured oscillatory non-Newtonian fluid flow data. These solutions provide useful analytical models supporting experimental and computation studies of arterial blood flow.

  6. Three-dimensional simulations of Bingham plastic flows with the multiple-relaxation-time lattice Boltzmann model

    OpenAIRE

    Song-Gui Chen; Chuan-Hu Zhang; Yun-Tian Feng; Qi-Cheng Sun; Feng Jin

    2016-01-01

    This paper presents a three-dimensional (3D) parallel multiple-relaxation-time lattice Boltzmann model (MRT-LBM) for Bingham plastics which overcomes numerical instabilities in the simulation of non-Newtonian fluids for the Bhatnagar–Gross–Krook (BGK) model. The MRT-LBM and several related mathematical models are briefly described. Papanastasiou’s modified model is incorporated for better numerical stability. The impact of the relaxation parameters of the model is studied in detail. The MRT-L...

  7. Solution of the square lid-driven cavity flow of a Bingham plastic using the finite volume method

    OpenAIRE

    Syrakos, Alexandros; Georgiou, Georgios C.; Alexandrou, Andreas N.

    2016-01-01

    We investigate the performance of the finite volume method in solving viscoplastic flows. The creeping square lid-driven cavity flow of a Bingham plastic is chosen as the test case and the constitutive equation is regularised as proposed by Papanastasiou [J. Rheol. 31 (1987) 385-404]. It is shown that the convergence rate of the standard SIMPLE pressure-correction algorithm, which is used to solve the algebraic equation system that is produced by the finite volume discretisation, severely det...

  8. Bingham viscosity and yield stress of molten (TeO2)0.78(WO3)0.22 glass

    International Nuclear Information System (INIS)

    Churbanov, M.F.; Snopatin, G.E.; Shaposhnikov, R.M.; Shabarov, V.V.; Plotnichenko, V.G.

    2007-01-01

    The flow of molten (TeO 2 ) 0.78 (WO 3 ) 0.22 glass in a circular-cylindrical channel has been studied at temperatures from 390 to 430 deg C. The variation of the measured volumetric flow rate with the gas pressure over the melt attests to non-Newtonian flow behavior. The flow rates calculated in the pseudo plastic model were used to determine the yield stress and plastic (Bingham) viscosity of the melt [ru

  9. Sample Results from MCU Solids Outage

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T.; Washington, A.; Oji, L.; Coleman, C.; Poirier, M.

    2014-09-22

    Savannah River National Laboratory (SRNL) has received several solid and liquid samples from MCU in an effort to understand and recover from the system outage starting on April 6, 2014. SRNL concludes that the presence of solids in the Salt Solution Feed Tank (SSFT) is the likely root cause for the outage, based upon the following discoveries: A solids sample from the extraction contactor #1 proved to be mostly sodium oxalate; A solids sample from the scrub contactor#1 proved to be mostly sodium oxalate; A solids sample from the Salt Solution Feed Tank (SSFT) proved to be mostly sodium oxalate; An archived sample from Tank 49H taken last year was shown to contain a fine precipitate of sodium oxalate; A solids sample from ; A liquid sample from the SSFT was shown to have elevated levels of oxalate anion compared to the expected concentration in the feed. Visual inspection of the SSFT indicated the presence of precipitated or transferred solids, which were likely also in the Salt Solution Receipt Tank (SSRT). The presence of the solids coupled with agitation performed to maintain feed temperature resulted in oxalate solids migration through the MCU system and caused hydraulic issues that resulted in unplanned phase carryover from the extraction into the scrub, and ultimately the strip contactors. Not only did this carryover result in the Strip Effluent (SE) being pushed out of waste acceptance specification, but it resulted in the deposition of solids into several of the contactors. At the same time, extensive deposits of aluminosilicates were found in the drain tube in the extraction contactor #1. However it is not known at this time how the aluminosilicate solids are related to the oxalate solids. The solids were successfully cleaned out of the MCU system. However, future consideration must be given to the exclusion of oxalate solids into the MCU system. There were 53 recommendations for improving operations recently identified. Some additional considerations or

  10. Main-coolant-pump shaft-seal reliability investigation. Interim report

    International Nuclear Information System (INIS)

    Fair, C.E.; Marsi, J.A.; Greer, A.O.

    1982-09-01

    This report contains the results of a survey of reactor coolant pump shaft seal reliability. The survey sample is representatively large (approx. = 27% of total US commercial plant population) and includes the three industry seal suppliers (Bingham-Williamette, Byron Jackson, and Westinghouse). Operationally incurred/induced problems and seal redesign parameters are identified. Failure hypotheses in the form of fault trees have been developed to describe the failure mechanisms. Recommendations are made for seal reliability improvement

  11. Numerical modeling of landslides and generated seismic waves: The Bingham Canyon Mine landslides

    Science.gov (United States)

    Miallot, H.; Mangeney, A.; Capdeville, Y.; Hibert, C.

    2016-12-01

    Landslides are important natural hazards and key erosion processes. They create long period surface waves that can be recorded by regional and global seismic networks. The seismic signals are generated by acceleration/deceleration of the mass sliding over the topography. They consist in a unique and powerful tool to detect, characterize and quantify the landslide dynamics. We investigate here the processes at work during the two massive landslides that struck the Bingham Canyon Mine on the 10th April 2013. We carry a combined analysis of the generated seismic signals and the landslide processes computed with a 3D modeling on a complex topography. Forces computed by broadband seismic waveform inversion are used to constrain the study and particularly the force-source and the bulk dynamic. The source time function are obtained by a 3D model (Shaltop) where rheological parameters can be adjusted. We first investigate the influence of the initial shape of the sliding mass which strongly affects the whole landslide dynamic. We also see that the initial shape of the source mass of the first landslide constrains pretty well the second landslide source mass. We then investigate the effect of a rheological parameter, the frictional angle, that strongly influences the resulted computed seismic source function. We test here numerous friction laws as the frictional Coulomb law and a velocity-weakening friction law. Our results show that the force waveform fitting the observed data is highly variable depending on these different choices.

  12. John Bingham Roberts and the first American monograph on human brain surgery.

    Science.gov (United States)

    Stone, J L

    2001-10-01

    JOHN BINGHAM ROBERTS (1852-1924) of Philadelphia was an active general surgeon in the latter 19th and early 20th centuries. He made pioneering contributions to a number of areas of surgery. From 1880 until the end of his career, he was one of the few American surgeons to advocate an aggressive exploratory approach to cranial fractures in an effort to avoid consequences such as infection, delayed seizures, and insanity. In his 1885 article in the Transactions of the American Surgical Association titled "The Field and Limitation of the Operative Surgery of the Human Brain," he predicted that with antiseptic precautions and the growing knowledge of cerebral localization, operations on the brain would become commonplace. This work predated that of Horsley, Keen, and many others. Roberts had a continuing interest in head injuries, cranial fractures, and the development of trephines and burrs for reconstructive cranial work, but his active enthusiasm for brain surgery diminished in the 1890s. Nevertheless, Roberts was a very prolific teacher and leader in American surgery who is perhaps best remembered for his monographs and textbooks on general, orthopedic, plastic, and reconstructive surgery.

  13. Continuous improvement of pump seals

    International Nuclear Information System (INIS)

    Wong, W.; Eyvindson, A.; Rhodes, D.B.

    2003-01-01

    Pump seal reliability continues to be an area needing improvement and ongoing vigilance. Methods have been developed for identifying and assessing factors relating to seal performance, selecting the most relevant ones for a specific station, and then focusing on the most significant aspects and how to improve. Discussion invariably addresses maintenance practices, seal design, monitoring capabilities, operating conditions, transients, and pump and motor design. Success in reliability improvement requires ongoing dialogue among the station operators, pump manufacturers and seal designers. AECL CAN-seals lead the nuclear industry in reliability and seal life. They effectively save operators millions of dollars in outage time and person-rem. This paper describes some of the significant developments in AECL's ongoing program in seal R and D, as well as recent new installations following the most demanding seal qualification programs to date. (author)

  14. Line outage contingency analysis including the system islanding scenario

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D.; Bhuyan, S. [Assam Engineering College, Jalukbari, Guwahati 781013 (India); Chowdhury, S.P. [Jadavpur University, Jadavpur, Kolkata 700 032 (India)

    2006-05-15

    The paper describes an algorithm for determining the line outage contingency of a line taking into account of line over load effect in remaining lines and subsequent tripping of over loaded line(s) leading to possible system split or islanding of a power system. The optimally ordered sparse [B'], [B'] matrices for the integrated system are used for load flow analysis to determine modified values of voltage phase angles [{delta}] and bus voltages [V] to determine the over loading effect on the remaining lines due to outage of a selected line outage contingency. In case of over loading in remaining line(s), the over loaded lines are removed from the system and a topology processor is used to find the islands. A fast decoupled load flow (FDLF) analysis is carried out for finding out the system variables for the islanded (or single island) system by incorporating appropriate modification in the [B'] and [B'] matrices of the integrated system. Line outage indices based on line overload, loss of load, loss of generation and static voltage stability are computed to indicate severity of a line outage of a selected line. (author)

  15. Integrated use of Primavera and ORAM codes in outage 1999 at NPP Krsko

    International Nuclear Information System (INIS)

    Krajnc, J.; Skaler, F.; Basic, I.; Kocnar, R.

    1999-01-01

    The paper deals with the following postulated main goals of outage scheduling with Primavera tool at Krsko NPP: planning and controlling of resources (people, equipment, locations, sources), controlling the safety aspects of an outage and assuring defense-in-depth philosophy (through integrated safety assessment by ORAM code), diversity use of the plan during preparations period and outage progress (MCB, work leaders, management, planning Dept., subcontractors, support, etc.), allowing for optimization of outage duration. A snapshot in Primavera of what actually happened in outage 1999, lessons learned and a new work template is the scope of the next year outage.(author)

  16. Questions and perceptions about nuclear power plant outages

    International Nuclear Information System (INIS)

    Mc Donald, R.P.

    1985-01-01

    The most commonly used measure of nuclear power plant productivity is ''availability'' which is usually construed to be the percentage of time in a given period that a nuclear unit is actually tied to a grid supplying electrical power. When a unit is not tied to a grid, it is in an ''outage'' condition, possibly being shutdown, refueled, repaired, or in some stage of startup. There are some very positive by-products of well performed outages in addition to cost and availability enhancements: almost all supervisory and engineering personnel participate in planning and preparations. This approach promotes the professional and leadership development of each person, the supervisors and engineers participate in a competitive venture as a team and enjoy and benefit from comparative interactions with other utilities, perhaps the greatest benefit reaped from the development of outage management expertise is the improved ability to handle unexpected plant problems

  17. Outage Risk Assessment and Management (ORAM) thermal-hydraulics toolkit

    International Nuclear Information System (INIS)

    Denny, V.E.; Wassel, A.T.; Issacci, F.; Pal Kalra, S.

    2004-01-01

    A PC-based thermal-hydraulic toolkit for use in support of outage optimization, management and risk assessment has been developed. This mechanistic toolkit incorporates simple models of key thermal-hydraulic processes which occur during an outage, such as recovery from or mitigation of outage upsets; this includes heat-up of water pools following loss of shutdown cooling, inadvertent drain down of the RCS, boiloff of coolant inventory, heatup of the uncovered core, and reflux cooling. This paper provides a list of key toolkit elements, briefly describes the technical basis and presents illustrative results for RCS transient behavior during reflux cooling, peak clad temperatures for an uncovered core and RCS response to loss of shutdown cooling. (author)

  18. Wolsong Unit 1 restart chemistry procedures during retubing outage

    International Nuclear Information System (INIS)

    Yun, Hyunran; Lee, Sarang; Moon, Yunyong; Kim, Seoyul

    2015-01-01

    Lay-up is aimed at protecting systems from degradation during outage, mainly by minimizing corrosion and particularly, when the outage is longer than 16 weeks. Due to the intrinsic design of CANDU reactors, their horizontal fuel channels should be replaced for another service life time. This poster presents the lay-up guidelines and methods recommended for re-tubing outage based on the first re-tubing operation made in Korea (at the Wolsung Unit 1). It is shown that dry lay-up with specific gas blanket was the sole choice for the primary heat transfer system, the moderator system and the steam cycle system while wet lay-up under circulation was recommended for the end shield cooling system and the liquid zone control system. The water filled part of steam generators, of the liquid zone control system and of the end shield cooling system was maintained normal

  19. Assessing energy supply security: Outage costs in private households

    International Nuclear Information System (INIS)

    Praktiknjo, Aaron J.; Hähnel, Alexander; Erdmann, Georg

    2011-01-01

    The objective of this paper is to contribute to the topic of energy supply security by proposing a Monte Carlo-based and a survey based model to analyze the costs of power interruptions. Outage cost estimations are particularly important when deciding on investments to improve supply security (e.g. additional transmission lines) in order to compare costs to benefits. But also other policy decisions on measures that have direct or indirect consequences for the supply security (e.g. a phasing out of nuclear energy) need to be based on results from outage cost estimations. The main focus of this paper lies with residential consumers, but the model is applied to commercial, industrial and governmental consumers as well. There are limited studies that have approached the problem of evaluating outage cost. When comparing the results of these studies, they often display a high degree of diversification. As consumers have different needs and dependencies towards the supply of electricity because of varying circumstances and preferences, a great diversity in outage cost is a logical consequence. To take the high degree of uncertainties into account, a Monte Carlo simulation was conducted in this study for the case of private households in Germany. - Highlights: ► A macroeconomic model to assess outage cost is proposed. ► Possibilities for substitution are considered by analyzing individual preferences for the time-use. ► Uncertainties are taken into account by using a Monte Carlo simulation. ► This study reveals the distribution of outage costs to different electricity consumers. ► Implications for energy policy decisions are discussed.

  20. Planning and management of outages in nuclear power plants

    International Nuclear Information System (INIS)

    Sica, G.F.; Fusari, W.; Reginelli, A.

    1984-01-01

    At present the Ente Nazionale per l'Energia Elettrica (ENEL) operates three nuclear power plants, only one of which belongs to the new generation, i.e. the Caorso Nuclear Power Plant which has been in commercial operation since December 1981. Outage planning, implementation and analysis are very important in order to minimize the shutdown time and thus improve plant availability, which is of particular importance for a large nuclear power plant. Such activities are very complicated because of the large number of jobs that have to be performed in accordance with detailed written procedures and which have to be properly documented and controlled. Large off-site resources are required which have to be accurately interfaced with on-site staff. The ENEL is making a great effort to define both the administrative and technical aspects of refuelling outages. As outage planning requires the availability and handling of a large amount of data and information, a maintenance information system that has been widely used in conventional plants was applied, with some modifications made especially for the Caorso Nuclear Power Plant. After two years the following results have been achieved: a large number of raw and processed data are now available, the first refuelling outage was carried out with few problems and according to schedule, and the second refuelling outage, based on the experience of the first, required somewhat less preparation and is developing well even though many special activities have had to be scheduled. The ENEL believes that the efforts made in the planning and management areas will pay off in terms of the short duration, smoothness and economy of further outages, both for Caorso and for future plants. (author)

  1. The course of a true outage never ran so smooth

    International Nuclear Information System (INIS)

    Harberts, Craig

    1994-01-01

    In order to improve the performance of outages at San Onofre Nuclear Generating Station in California, the working structure of the entire organisation has had to be radically altered, in order to bring San Onofre up to standard with other nuclear plants known to be performing well. Working systems were simplified and efficiency improved. Personnel needed to be remotivated to work cooperatively and the outage budget process was revised to include input from all relevant organizations, historical costs and benchmark information from other plants that performed well. Finally, the decision making and teamwork culture has altered radically at San Onofre over the last decade. (UK)

  2. Impacts of organization and management on outage performance

    International Nuclear Information System (INIS)

    Huang Yuhao; Cheng, S.-K.

    2004-01-01

    From probabilistic safety assessments and root cause analyses for incidents/accidents, the risk at refueling outage has recently been recognized to be comparable to (or even more significant than) the commonly evaluated risk at power in a Nuclear Power Plant (NPP). This paper summarizes the major findings in the aspect of 'organization and management', which is identified to have significant impacts on outage performance in the qualitative assessment of a PWR plant. In order to reduce the potential risk arisen from those identified imperfections, the corresponding suggestions are also proposed. (author)

  3. On test and maintenance: Optimization of allowed outage time

    International Nuclear Information System (INIS)

    Mavko, B.; Cepin, M.T.

    2000-01-01

    Probabilistic Safety Assessment is widely becoming standard method for assessing, maintaining, assuring and improving the nuclear power plant safety. To achieve one of its many potential benefits, the optimization of allowed outage time specified in technical specifications is investigated. Proposed is the risk comparison approach for evaluation of allowed outage time. The risk of shutting the plant down due to failure of certain equipment is compared to the risk of continued plant operation with the specified equipment down. The core damage frequency serves as a risk measure. (author)

  4. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  5. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    Miller, D.W.; Green, W.H.

    1995-01-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  6. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  7. Penis Pump

    Science.gov (United States)

    ... your appointment might be less involved. Choosing a penis pump Some penis pumps are available without a ... it doesn't get caught in the ring. Penis pumps for penis enlargement Many advertisements in magazines ...

  8. A free-surface lattice Boltzmann method for modelling the filling of expanding cavities by Bingham fluids.

    Science.gov (United States)

    Ginzburg, Irina; Steiner, Konrad

    2002-03-15

    The filling process of viscoplastic metal alloys and plastics in expanding cavities is modelled using the lattice Boltzmann method in two and three dimensions. These models combine the regularized Bingham model for viscoplastic fluids with a free-interface algorithm. The latter is based on a modified immiscible lattice Boltzmann model in which one species is the fluid and the other one is considered to be a vacuum. The boundary conditions at the curved liquid-vacuum interface are met without any geometrical front reconstruction from a first-order Chapman-Enskog expansion. The numerical results obtained with these models are found in good agreement with available theoretical and numerical analysis.

  9. Yield strengths of flows on the earth, Mars, and moon. [application of Bingham plastic model to lava flows

    Science.gov (United States)

    Moore, H. J.; Arthur, D. W. G.; Schaber, G. G.

    1978-01-01

    Dimensions of flows on the earth, Mars, and moon and their topographic gradients obtained from remote measurements are used to calculate yield strengths with a view to explore the validity of the Bingham plastic model and determine whether there is a relation between yield strengths and silica contents. Other factors are considered such as the vagaries of natural phenomena that might contribute to erroneous interpretations and measurements. Comparison of yield strengths of Martian and lunar flows with terrestrial flows suggests that the Martian and lunar flows are more akin to terrestrial basalts than they are to terrestrial andesites, trachytes, and rhyolites.

  10. Efficient Simulation of the Outage Probability of Multihop Systems

    KAUST Repository

    Ben Issaid, Chaouki; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    In this paper, we present an efficient importance sampling estimator for the evaluation of the outage probability of multihop systems with amplify-and-forward channel state-information-assisted. The proposed estimator is endowed with the bounded relative error property. Simulation results show a significant reduction in terms of number of simulation runs compared to naive Monte Carlo.

  11. Options for shortening nuclear power plant refueling outages

    International Nuclear Information System (INIS)

    Kastl, H.

    2001-01-01

    Deregulation of the European electricity market on 01.01.1999 forced a large number of electric utilities- especially nuclear power plant operators - to find ways of drastically cutting down their costs in order to be able to compete successfully within the new market environment. Nuclear power plants currently in operation mainly have three potential ways of reducing their power generating costs: by increasing plant availability, reducing fuel costs and cutting down operating costs. The optimization of plant refueling outages offers considerable potential for enhancing plant availability, but also helps bring down operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of its duration and costs, a variety of approaches are possible - all of which, however, involve certain key factors such as good organization, planning, logistics and control, improvement of equipment and tools, as well as motivation of personnel. Another aspect is the introduction of innovative technologies. In the last few years, such technologies have frequently enabled maintenance effort to be reduced, thus saving considerable time, and have also resulted in a need for fewer personnel to carry out the work, thus reducing radiation exposure. In many instances they have also improved the quality of work and outage performance as a whole. The paper uses recent examples to show how innovative technologies can contribute to-wards reducing nuclear plant maintenance costs and shorten the duration of refueling out-ages. (author)

  12. Refueling outage services in Spanish Nuclear Power Plants

    International Nuclear Information System (INIS)

    Landete, J. L.; Soto, M.; Nunuez, A.

    2007-01-01

    DOMINGUIS Group, through its 75 years of business development, has positioned as the Spanish leader Group in Services for the Nuclear Energy and Petrochemical Sectors. In this article, we present the most significant services summary that, through the companies that constitute DOMINGUIS Group, we have developed in Refueling Outage in Spanish Nuclear Power Plants. (Author)

  13. Study of Arkansas Nuclear One-1 13th refueling outage

    International Nuclear Information System (INIS)

    Hashiba, Takashi

    1997-01-01

    Recently performance of nuclear power plants in the USA has improved remarkably. Their average automatic shutdown rate has been sharply dropping, although it is still higher than that in Japan, and their average capacity factor has become higher than that in Japan in recent years. One of the main contributors is an extension of the operational period, and another is a shortening of refueling-outage time. It is considerably difficult to have accomplished both the improvement of plant reliability and shortening of refueling-outage time because their refueling outage corresponds to our periodical inspection which is central to maintenance activities in Japanese plants. In order to learn how they have been achieved, a visit to Arkansas Nuclear One-1 (ANO-1) which obtained the top-class result of SALP (Systematic Assessment of Licensee Performance) performed by the Nuclear Regulatory Commission was planned and study of their 13th refueling outage was carried out. Their achievements result from performance-base maintenance and on-line maintenance, based on a proper preventive maintenance program, and untiring efforts of efficiency improvement, represented by the introduction of several on-line systems. And the reason behind this is severe competition concerning power generation cost reduction. (author)

  14. Study of Arkansas Nuclear One-1 13th refueling outage

    Energy Technology Data Exchange (ETDEWEB)

    Hashiba, Takashi [Institute of Nuclear Safety System Inc., Seika, Kyoto (Japan)

    1997-09-01

    Recently performance of nuclear power plants in the USA has improved remarkably. Their average automatic shutdown rate has been sharply dropping, although it is still higher than that in Japan, and their average capacity factor has become higher than that in Japan in recent years. One of the main contributors is an extension of the operational period, and another is a shortening of refueling-outage time. It is considerably difficult to have accomplished both the improvement of plant reliability and shortening of refueling-outage time because their refueling outage corresponds to our periodical inspection which is central to maintenance activities in Japanese plants. In order to learn how they have been achieved, a visit to Arkansas Nuclear One-1 (ANO-1) which obtained the top-class result of SALP (Systematic Assessment of Licensee Performance) performed by the Nuclear Regulatory Commission was planned and study of their 13th refueling outage was carried out. Their achievements result from performance-base maintenance and on-line maintenance, based on a proper preventive maintenance program, and untiring efforts of efficiency improvement, represented by the introduction of several on-line systems. And the reason behind this is severe competition concerning power generation cost reduction. (author)

  15. Efficient Simulation of the Outage Probability of Multihop Systems

    KAUST Repository

    Ben Issaid, Chaouki

    2017-10-23

    In this paper, we present an efficient importance sampling estimator for the evaluation of the outage probability of multihop systems with amplify-and-forward channel state-information-assisted. The proposed estimator is endowed with the bounded relative error property. Simulation results show a significant reduction in terms of number of simulation runs compared to naive Monte Carlo.

  16. Practice of fuel management and outage strategy at Paks NPP

    International Nuclear Information System (INIS)

    Farago, P.; Hamvas, I.; Szecsenyi, Zs.; Nemes, I.; Javor, E.

    2000-01-01

    The Paks Nuclear Power Plant generates almost 40% of Hungarian electricity production at lowest price. In spite of this fact the reduction of operational and maintenance costs is one of the most important goal of the plant management. The proper fuel management and outage strategy can give a considerable influence for this cost reduction. The aim of loading pattern planning is to get the required cycle length with available fuel cassettes and to keep all key parameters of safety analysis under safety limits. Another important point is production at profit, where both the fuel and spent fuel cost are determining. Earlier the conditions given by our only fuel supplier restricted our possibilities, so at the beginning the fuel arrangement changing was the only way to improve efficiency of fuel using. As first step we introduced the low leakage core design. The next step was the 4 years cycle using of some cassettes. By this way nearly half of 3 years cycle old cassettes remained in the core for fourth cycle. In the immediate future we want to use profiled cassettes developed by Russian supplier. Simultaneously we will load new type of WWER cassettes with burnable poison developed by BNFL Company. Hereby we can apply more BNFL cassettes for four years cycle even more. Both cost of fuel and number of spent fuel can be reduced besides keeping parameters under safety limits. The Hungarian in service inspection rules determine that every four year we have to make a complete inspection of reactor vessel. Therefore earlier we had two types of outages. Every 4 years we planned a long outage with 55-65 days duration and normal ones with about 30-35 days duration between the long ones. During the normal outages this way did not give us enough room to utilise the shortest possible critical path determined by works on reactor. Some years ago we changed our outage strategy. Now we plan every 4 years a long outage, and between them one normal and two short ones. As a result the

  17. World class performance: the outage/operating cycle continuum

    Energy Technology Data Exchange (ETDEWEB)

    Remphal, M. [Ontario Power Generation, Darlington, Ontario (Canada)

    2011-07-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  18. World class performance: the outage/operating cycle continuum

    International Nuclear Information System (INIS)

    Remphal, M.

    2011-01-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  19. Does Your Domestic Photovoltaic Energy System Survive Grid Outages?

    Directory of Open Access Journals (Sweden)

    Marijn R. Jongerden

    2016-09-01

    Full Text Available Domestic renewable energy systems, including photovoltaic energy generation, as well as local storage, are becoming increasingly popular and economically feasible, but do come with a wide range of options. Hence, it can be difficult to match their specification to specific customer’s needs. Next to the usage-specific demand profiles and location-specific production profiles, local energy storage through the use of batteries is becoming increasingly important, since it allows one to balance variations in production and demand, either locally or via the grid. Moreover, local storage can also help to ensure a continuous energy supply in the presence of grid outages, at least for a while. Hybrid Petri net (HPN models allow one to analyze the effect of different battery management strategies on the continuity of such energy systems in the case of grid outages. The current paper focuses on one of these strategies, the so-called smart strategy, that reserves a certain percentage of the battery capacity to be only used in case of grid outages. Additionally, we introduce a new strategy that makes better use of the reserved backup capacity, by reducing the demand in the presence of a grid outage through a prioritization mechanism. This new strategy, called power-save, only allows the essential (high-priority demand to draw from the battery during power outages. We show that this new strategy outperforms previously-proposed strategies through a careful analysis of a number of scenarios and for a selection of survivability measures, such as minimum survivability per day, number of survivable hours per day, minimum survivability per year and various survivability quantiles.

  20. Natural convection in Bingham plastic fluids from an isothermal spheroid: Effects of fluid yield stress, viscous dissipation and temperature-dependent viscosity

    Science.gov (United States)

    Gupta, Anoop Kumar; Gupta, Sanjay; Chhabra, Rajendra Prasad

    2017-08-01

    In this work, the buoyancy-induced convection from an isothermal spheroid is studied in a Bingham plastic fluid. Extensive results on the morphology of approximate yield surfaces, temperature profiles, and the local and average Nusselt numbers are reported to elucidate the effects of the pertinent dimensionless parameters: Rayleigh number, 102 ≤ Ra ≤ 106; Prandtl number, 20 ≤ Pr ≤ 100; Bingham number, 0 ≤ Bn ≤ 103, and aspect ratio, 0.2 ≤ e ≤ 5. Due to the fluid yield stress, fluid-like (yielded) and solid-like (unyielded) regions coexist in the flow domain depending upon the prevailing stress levels vis-a-vis the value of the fluid yield stress. The yielded parts progressively grow in size with the rising Rayleigh number while this tendency is countered by the increasing Bingham and Prandtl numbers. Due to these two competing effects, a limiting value of the Bingham number ( Bn max) is observed beyond which heat transfer occurs solely by conduction due to the solid-like behaviour of the fluid everywhere in the domain. Such limiting values bear a positive dependence on the Rayleigh number ( Ra) and aspect ratio ( e). In addition to this, oblate shapes ( e 1) impede it. Finally, simple predictive expressions for the maximum Bingham number and the average Nusselt number are developed which can be used to predict a priori the overall heat transfer coefficient in a new application. Also, a criterion is developed in terms of the composite parameter Bn• Gr-1/2 which predicts the onset of convection in such fluids. Similarly, another criterion is developed which delineates the conditions for the onset of settling due to buoyancy effects. The paper is concluded by presenting limited results to delineate the effects of viscous dissipation and the temperature-dependent viscosity on the Nusselt number. Both these effects are seen to be rather small in Bingham plastic fluids.

  1. A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys

    Energy Technology Data Exchange (ETDEWEB)

    Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

    2003-11-01

    A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1

  2. Dynamic analysis of an SDOF helicopter model featuring skid landing gear and an MR damper by considering the rotor lift factor and a Bingham number

    Science.gov (United States)

    Saleh, Muftah; Sedaghati, Ramin; Bhat, Rama

    2018-06-01

    The present study addresses the performance of a skid landing gear (SLG) system of a rotorcraft impacting the ground at a vertical sink rate of up to 4.5 ms‑1. The impact attitude is assumed to be level as per chapter 527 of the Airworthiness Manual of Transport Canada Civil Aviation and part 27 of the Federal Aviation Regulations of the US Federal Aviation Administration. A single degree of freedom helicopter model is investigated under different values of rotor lift factor, L. In this study, three SLG versions are evaluated: (a) standalone conventional SLG; (b) SLG equipped with a passive viscous damper; and (c) SLG incorporated a magnetorheological energy absorber (MREA). The non-dimensional solutions of the helicopter models show that the two former SLG systems suffer adaptability issues with variations in the impact velocity and the rotor lift factor. Therefore, the alternative successful choice is to employ the MREA. Two different optimum Bingham numbers for compression and rebound strokes are defined. A new chart, called the optimum Bingham number versus rotor lift factor ‘B{i}o-L’, is introduced in this study to correlate the optimum Bingham numbers to the variation in the rotor lift factor and to provide more accessibility from the perspective of control design. The chart shows that the optimum Bingham number for the compression stroke is inversely linearly proportional to the increase in the rotor lift factor. This alleviates the impact force on the system and reduces the amount of magnetorheological yield force that would be generated. On the contrary, the optimum Bingham number for the rebound stroke is found to be directly linearly proportional to the rotor lift factor. This ensures controllable attenuation of the restoring force of the linear spring element. This idea can be exploited to generate charts for different landing attitudes and sink rates. In this article, the response of the helicopter equipped with the conventional undamped, damped

  3. Development and demonstration of techniques for reducing occupational radiation doses during refueling outages. Tasks 7A/7B. Advanced outage management and radiation exposure control

    International Nuclear Information System (INIS)

    1985-03-01

    Objectives of Tasks 7A and 7B were to develop and demonstrate computer based systems to assist plant management and staff in utilizing information more effectively to reduce occupational exposures received as a result of refueling outages, and to shorten the duration of the outage. The Advanced Outage Management (AOM) Tool (Task 7A) is an automated outage planning system specifically designed to meet the needs of nuclear plant outage management. The primary objective of the AOM tool is to provide a computerized system that can manipulate the information typically associated with outage planning and scheduling to furnish reports and schedules that more accurately project the future course of the outage. The Radiation Exposure Control (REC) Tool (Task 7B) is a computerized personnel radiation exposure accounting and management system designed to enable nuclear plant management to project and monitor total personnel radiation exposure on a real-time basis. The two systems were designed to operate on the same computer system and interface through a common database that enables information sharing between plant organizations not typically interfaced. This interfacing provides outage planners with a means of incorporating occupational radiation exposure as a factor for making decisions on the course of an outage

  4. Centrifugal pumps

    CERN Document Server

    Anderson, HH

    1981-01-01

    Centrifugal Pumps describes the whole range of the centrifugal pump (mixed flow and axial flow pumps are dealt with more briefly), with emphasis on the development of the boiler feed pump. Organized into 46 chapters, this book discusses the general hydrodynamic principles, performance, dimensions, type number, flow, and efficiency of centrifugal pumps. This text also explains the pumps performance; entry conditions and cavitation; speed and dimensions for a given duty; and losses. Some chapters further describe centrifugal pump mechanical design, installation, monitoring, and maintenance. The

  5. The process of NPP refuelling outage analysis and follow-up

    International Nuclear Information System (INIS)

    Nemec, T.; Savli, S.; Cernilogar Radez, M.; Persic, A.; Pecek, V.; Stritar, A.

    2007-01-01

    Following the outages in 2004 and 2006, the Slovenian Nuclear Safety Administration (SNSA) has started with the practice of independent outage analysis in a form of an internal report. It includes a comparison of performed activities against the planned time schedule of activities, evaluation of design modifications implementation and analysis of significant events. The main result of the outage analysis is a list of recommendations and some open issues that have been identified. These findings are the basis for development of an action plan for SNSA activities until the next outage, aimed at eliminating deficiencies found out during the outage and further improving outage activities. The established system of outage supervision together with the final analysis and long term action plan represents an effective continuous safety supervision process, by which the regulatory body independently contributes to the higher level of safety culture both at the licensee and among its own staff. (author)

  6. Siemens capabilities to perform detailed fuel inspections during short outages

    International Nuclear Information System (INIS)

    Knecht, K.; Reparaz, A.

    1999-01-01

    Fuel inspection data are used to support development activities such as corrosion resistant cladding and advanced fuel assembly designs that will reach higher burnups. Increased inspection efforts are necessary to optimize fuel management and performance strategies. Additionally, there is an increasing trend to reduce outage time in Germany and abroad. Siemens has recently developed several timesaving systems for rapid inspection of fuel assemblies and core components. Siemens' focus in developing these systems has been to obtain data in reduced reactor outage time while increasing both the volume and the quality of the measured data. Mast sipping for PWRs is used for identifying leaking fuel assemblies and allows early detection of leaks during downloading of the fuel assemblies from the reactor. An In-Core sipping system for BWRs based on a hood technique to allow testing a full core within 16 hours is under development. (authors)

  7. Outage analysis of opportunistic decode-and-forward relaying

    KAUST Repository

    Tourki, Kamel

    2010-09-01

    In this paper, we investigate a dual-hop opportunistic decode-and-forward relaying scheme where the source may or not be able to communicate directly with the destination. We first derive statistics based on exact probability density function (PDF) of each hop. Then, the PDFs are used to determine closed-form outage probability expression for a transmission rate R. Furthermore, we evaluate the asymptotic outage performance and the diversity order is deduced. Unlike existing works where the analysis focused on high signal-to-noise ratio (SNR) regime, such results are important to enable the designers to take decisions regarding practical systems that operate at low SNR regime. We show that performance simulation results coincide with our analytical results under practical assumption of unbalanced hops. © 2010 IEEE.

  8. Methodology if inspections to carry out the nuclear outages model

    International Nuclear Information System (INIS)

    Aycart, J.; Mortenson, S.; Fourquet, J. M.

    2005-01-01

    Before the nuclear generation industry was deregulated in the United States, refueling and maintenance outages in nuclear power plants usually lasted orotund 100 days. After deregulation took effect, improved capability factors and performances became more important. As a result, it became essential to reduce the critical path time during the outage, which meant that activities that had typically been done in series had to be executed in parallel. The new outage model required the development of new tools and new processes, The 360-degree platform developed by GE Energy has made it possible to execute multiple activities in parallel. Various in-vessel visual inspection (IVVI) equipments can now simultaneously perform inspections on the pressurized reactor vessel (RPV) components. The larger number of inspection equipments in turn results in a larger volume of data, with the risk of increasing the time needed for examining them and postponing the end of the analysis phase, which is critical for the outage. To decrease data analysis times, the IVVI Digitalisation process has been development. With this process, the IVVI data are sent via a high-speed transmission line to a site outside the Plant called Center of Excellence (COE), where a team of Level III experts is in charge of analyzing them. The tools for the different product lines are being developed to interfere with each other as little as possible, thus minimizing the impact of the critical path on plant refueling activities. Methods are also being developed to increase the intervals between inspection. In accordance with the guidelines of the Boiling Water Reactor Vessel and Internals project (BWRVIP), the intervals between inspections are typically longer if ultrasound volumetric inspections are performed than if the scope is limited to IVVI. (Author)

  9. Outage probability of distributed beamforming with co-channel interference

    KAUST Repository

    Yang, Liang

    2012-03-01

    In this letter, we consider a distributed beamforming scheme (DBF) in the presence of equal-power co-channel interferers for both amplify-and-forward and decode-and-forward relaying protocols over Rayleigh fading channels. We first derive outage probability expressions for the DBF systems. We then present a performance analysis for a scheme relying on source selection. Numerical results are finally presented to verify our analysis. © 2011 IEEE.

  10. Outage Probability Analysis of FSO Links over Foggy Channel

    KAUST Repository

    Esmail, Maged Abdullah; Fathallah, Habib; Alouini, Mohamed-Slim

    2017-01-01

    Outdoor Free space optic (FSO) communication systems are sensitive to atmospheric impairments such as turbulence and fog, in addition to being subject to pointing errors. Fog is particularly severe because it induces an attenuation that may vary from few dBs up to few hundreds of dBs per kilometer. Pointing errors also distort the link alignment and cause signal fading. In this paper, we investigate and analyze the FSO systems performance under fog conditions and pointing errors in terms of outage probability. We then study the impact of several effective communication mitigation techniques that can improve the system performance including multi-hop, transmit laser selection (TLS) and hybrid RF/FSO transmission. Closed-form expressions for the outage probability are derived and practical and comprehensive numerical examples are suggested to assess the obtained results. We found that the FSO system has limited performance that prevents applying FSO in wireless microcells that have a 500 m minimum cell radius. The performance degrades more when pointing errors appear. Increasing the transmitted power can improve the performance under light to moderate fog. However, under thick and dense fog the improvement is negligible. Using mitigation techniques can play a major role in improving the range and outage probability.

  11. Upgrading BWR training simulators for annual outage operation training

    International Nuclear Information System (INIS)

    Yamakabe, K.; Nakajima, A.; Shiyama, H.; Noji, K.; Okabe, N.; Murata, F.

    2006-01-01

    Based upon the recently developed quality assurance program by the Japanese electric companies, BWR Operator Training Center (BTC) identified the needs to enhance operators' knowledge and skills for operations tasks during annual outage, and started to develop a dedicated operator training course specialized for them. In this paper, we present the total framework of the training course for annual outage operations and the associated typical three functions of our full-scope simulators specially developed and upgraded to conduct the training; namely, (1) Simulation model upgrade for the flow and temperature behavior concerning residual heat removal (RHR) system with shutdown cooling mode, (2) Addition of malfunctions for DC power supply equipment, (3) Simulation model upgrade for water filling operation for reactor pressurization (future development). We have implemented a trial of the training course by using the upgraded 800MW full-scope training simulator with functions (1) and (2) above. As the result of this trial, we are confident that the developed training course is effective for enhancing operators' knowledge and skills for operations tasks during annual outage. (author)

  12. Outage Probability Analysis of FSO Links over Foggy Channel

    KAUST Repository

    Esmail, Maged Abdullah

    2017-02-22

    Outdoor Free space optic (FSO) communication systems are sensitive to atmospheric impairments such as turbulence and fog, in addition to being subject to pointing errors. Fog is particularly severe because it induces an attenuation that may vary from few dBs up to few hundreds of dBs per kilometer. Pointing errors also distort the link alignment and cause signal fading. In this paper, we investigate and analyze the FSO systems performance under fog conditions and pointing errors in terms of outage probability. We then study the impact of several effective communication mitigation techniques that can improve the system performance including multi-hop, transmit laser selection (TLS) and hybrid RF/FSO transmission. Closed-form expressions for the outage probability are derived and practical and comprehensive numerical examples are suggested to assess the obtained results. We found that the FSO system has limited performance that prevents applying FSO in wireless microcells that have a 500 m minimum cell radius. The performance degrades more when pointing errors appear. Increasing the transmitted power can improve the performance under light to moderate fog. However, under thick and dense fog the improvement is negligible. Using mitigation techniques can play a major role in improving the range and outage probability.

  13. Ultrasonic Examination of Jet Pump Diffuser Assemblies

    International Nuclear Information System (INIS)

    Hacker, M.; Levesque, M.; Whitman, G.

    1998-01-01

    In October 1997 the Boiling Water REactor Vessel and Internals Project (BWRVIP) issued the BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines (BWRVIP-41). This document identified several welds on the jet pump diffuser assembly that are susceptible to Intergranular Stress Corrosion Cracking (IGSCC) or fatigue, and whose failure could result in jet pump disassembly. Based on the potential for failures, the document recommends inspection of 50% of the high priority welds at the next refueling outage for each BWR, with 100% expansion if flaws are identified. Because each diffuser assembly contains as many as six high priority welds, and access to these welds from the annulus is very restricted, implementing these recommendations can have a significant impact on outage critical path. In an effort to minimize the impact of implementing these recommendations, Framatome Technologies, Inc (FTI) developed a method to perform ultrasonic examinations of the jet pump diffuser assembly welds utilizing remotely operated equipment from the inner diameter (ID) of the diffuser assembly. This paper will discuss the tooling, ultrasonic methods, and delivery techniques used to perform the examinations, as well as the results obtained from a spring 1998 deployment of the system at a U.S. Nuclear Generating Plant. (Author)

  14. Pressurizer pump reliability analysis high flux isotope reactor

    International Nuclear Information System (INIS)

    Merryman, L.; Christie, B.

    1993-01-01

    During a prolonged outage from November 1986 to May 1990, numerous changes were made at the High Flux Isotope Reactor (HFIR). Some of these changes involved the pressurizer pumps. An analysis was performed to calculate the impact of these changes on the pressurizer system availability. The analysis showed that the availability of the pressurizer system dropped from essentially 100% to approximately 96%. The primary reason for the decrease in availability comes because off-site power grid disturbances sometimes result in a reactor trip with the present pressurizer pump configuration. Changes are being made to the present pressurizer pump configuration to regain some of the lost availability

  15. Performance Shaping Factors Assessments and Application to PHWR Outages

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seung Woo

    2007-02-15

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10{sup -4} more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted

  16. Performance Shaping Factors Assessments and Application to PHWR Outages

    International Nuclear Information System (INIS)

    Lee, Seung Woo

    2007-02-01

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10 -4 more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted in changes of core damage

  17. Bingham plastic fluid flow model in tape casting of ceramics using two doctor blades – analytical approach

    DEFF Research Database (Denmark)

    Jabbari, Masoud; Hattel, Jesper Henri

    2014-01-01

    One of the most common processes used in manufacturing of multilayer ceramic packages, multilayer capacitors and large scale integration circuits is tape casting. In this process, the wet tape thickness is one of the single most determining parameters affecting the final properties of the product......, and it is therefore of great interest to be able to control it. One way to control the tape thickness is to use a two doctor blade configuration in the tape casting machine. In this case, it becomes important to fix the height of the slurry in front of both doctor blades according to the desired tape thickness...... and casting speed (belt velocity). In the present work, the flow in both doctor blade regions of a slurry is described with a steady state momentum equation in combination with a Bingham plastic constitutive equation, and this is integrated to a closed form analytical solution for both reservoirs based...

  18. Heat pumps

    CERN Document Server

    Macmichael, DBA

    1988-01-01

    A fully revised and extended account of the design, manufacture and use of heat pumps in both industrial and domestic applications. Topics covered include a detailed description of the various heat pump cycles, the components of a heat pump system - drive, compressor, heat exchangers etc., and the more practical considerations to be taken into account in their selection.

  19. On Outage Performance of Spectrum-Sharing Communication over M-Block Fading

    KAUST Repository

    Alabbasi, AbdulRahman

    2015-12-06

    In this paper, we consider a cognitive radio system in which a block-fading channel is assumed. Each transmission frame consists of M blocks and each block undergoes a different channel gain. Instantaneous channel state information about the interference links remains unknown to the primary and secondary users. We minimize the secondary user\\'s targeted outage probability over the block-fading channels. To protect the primary user, a statistical constraint on its targeted outage probability is enforced. The secondary user\\'s targeted outage region and the corresponding optimal power are derived. We also propose two sub-optimal power strategies and derive compact expressions for the corresponding outage probabilities. These probabilities are shown to be asymptotic lower and upper bounds on the outage probability. Utilizing these bounds, we derive the exact diversity order of the secondary user outage probability. Selected numerical results are presented to characterize the system\\'s behavior.

  20. Heat pumps

    CERN Document Server

    Brodowicz, Kazimierz; Wyszynski, M L; Wyszynski

    2013-01-01

    Heat pumps and related technology are in widespread use in industrial processes and installations. This book presents a unified, comprehensive and systematic treatment of the design and operation of both compression and sorption heat pumps. Heat pump thermodynamics, the choice of working fluid and the characteristics of low temperature heat sources and their application to heat pumps are covered in detail.Economic aspects are discussed and the extensive use of the exergy concept in evaluating performance of heat pumps is a unique feature of the book. The thermodynamic and chemical properties o

  1. Design Concepts for an Outage Control Center Information Dashboard

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques Victor [Idaho National Lab. (INL), Idaho Falls, ID (United States); St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thompson, Cheradan Jo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whitesides, McKenzie Jo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-12-01

    The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data

  2. Design Concepts for an Outage Control Center Information Dashboard

    International Nuclear Information System (INIS)

    Hugo, Jacques Victor; St Germain, Shawn Walter; Thompson, Cheradan Jo; Whitesides, McKenzie Jo; Farris, Ronald Keith

    2015-01-01

    The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data

  3. Use of workstations in the ANAV outage tasks course access

    International Nuclear Information System (INIS)

    Gómez Rodriguez, Carlos A.

    2016-01-01

    The access course for the Asco and Vandellos II Nuclear Power Plants contains all of the training that is considered necessary in compliance with the stipulations of current legislation for the pupils to carry out their activity at the plants. Given the heterogeneity of the special characteristics of those workers who take part in the outage tasks at our plants we have sought to improve the learning values of their access course with the inclusion of Work Stations since 2013. Several changes have been made in the training action since that date to make it more interactive.

  4. Centrifugal pumps

    CERN Document Server

    Gülich, Johann Friedrich

    2014-01-01

    This book gives an unparalleled, up-to-date, in-depth treatment of all kinds of flow phenomena encountered in centrifugal pumps including the complex interactions of fluid flow with vibrations and wear of materials. The scope includes all aspects of hydraulic design, 3D-flow phenomena and partload operation, cavitation, numerical flow calculations, hydraulic forces, pressure pulsations, noise, pump vibrations (notably bearing housing vibration diagnostics and remedies), pipe vibrations, pump characteristics and pump operation, design of intake structures, the effects of highly viscous flows, pumping of gas-liquid mixtures, hydraulic transport of solids, fatigue damage to impellers or diffusers, material selection under the aspects of fatigue, corrosion, erosion-corrosion or hydro-abrasive wear, pump selection, and hydraulic quality criteria. As a novelty, the 3rd ed. brings a fully analytical design method for radial impellers, which eliminates the arbitrary choices inherent to former design procedures. The d...

  5. The costs of power outages: A case study from Cyprus

    International Nuclear Information System (INIS)

    Zachariadis, Theodoros; Poullikkas, Andreas

    2012-01-01

    We study the costs of electricity disruptions in Cyprus, which suffered severe power shortages in summer 2011 after an explosion that destroyed 60% of its power generating capacity. We employ both economic and engineering approaches to assess these costs. Among other calculations, we provide estimates of the value of lost load by economic sector and the hourly value of electricity by season and type of day. The results of two economic methods employed to assess welfare losses differ largely, indicating that the assessment of outage costs is associated with many uncertainties. Our calculations show that the emergency actions taken by national energy authorities in response to that accident, though not necessarily optimal, have generally been appropriate and in line with international best practices: the additional costs incurred due to these measures are lower than the economic losses avoided thanks to these actions. Preferential treatment of specific consumer types in the case of repeated power outages remains an open policy question. - Highlights: ► We evaluate the response of energy authorities to a sudden electricity crisis. ► We combine two top-down economic methods and a bottom-up engineering approach. ► We estimate the value of lost electricity by hour, day type and season. ► The response of energy authorities turned out to be effective. ► Costs of emergency actions were lower than the economic losses avoided.

  6. Radiological protection for the ANGRA 1 steam generator replacement outage

    International Nuclear Information System (INIS)

    Oliveira, Magno Jose de; Amaral, Marcos Antonio do; Minelli, Edson; Ferreira, William Alves

    2009-01-01

    The Angra 1 Nuclear Power Plant (NPP) is a Westinghouse two-loop plant with net output before its 1P16 Outage of 632 MWe, with the Old Steam Generators (OSG) type model D3, which were replaced by two new Steam Generators with feed water-ring system. Localized in Angra dos Reis, Rio de Janeiro - Brazil, Angra 1 started in commercial operation in 1985 and, from the beginning problems related to corrosion have appeared in the Inconel 600 alloy of the tubes. The corrosion problems indicated the necessity for a strong control of the tubes thicknesses and, after a time, the ELETRONUCLEAR decided to replace the OSG. In 2009, ELETRONUCLEAR initiated in January 24, the actions for the Steam Generators Replacement - SGR. During the SGR process, several controls were applied in field, which made possible to have no radiological accidents, no dose limits exceeded, and permitted to achieve a very good result in terms of Collective Dose. This paper describes the radiological controls applied for the Angra 1 Steam Generator Replacement Outage, the radiological protection team sizing and distribution and the obtained results. (author)

  7. Outage Analysis of Asymmetric RF-FSO Systems

    KAUST Repository

    Ansari, Imran Shafique

    2017-03-20

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channels cascaded with free-space optical (FSO) links is presented. The RF links are modeled by the Rayleigh fading distribution and the FSO links are modeled by Malaga (M) turbulence distribution. The FSO links account for pointing errors and both types of detection techniques (i.e. heterodyne detection as well as intensity modulation/direct detection (IM/DD)). Transmit diversity is applied at the source, selection combining is applied at the destination, and the relay is equipped with single RF receive antenna and single aperture for relaying the information over FSO links. With this model, a new exact closed-form expression is derived for the outage probability of the end-to- end signal-to-noise ratio of such communication systems in terms of the Meijer\\'s G function under fixed amplify-and-forward relay scheme. All new analytical results are verified via computer-based Monte-Carlo simulations and are illustrated by some selected numerical results.

  8. Evaluation of allowed outage time using PRA results

    International Nuclear Information System (INIS)

    Johanson, G.

    1985-01-01

    In a probabilistic risk assessment (PRA) different measures of risk importance can be established. These measures can be used as a basis for further evaluation and determination of allowed outage time for specific components, within safety systems of a nuclear power plant. In order to optimize the allowed outage time (AOT) stipulated in the plant's Technical Specification it is necessary to create a methodology which could incorporate existing PRA data into a quantitative extrapolation. In order to evaluate the plant risk status due to AOT in a quantitative manner, the risk achievement worth is utilized. Risk achievement worth is defined as follows: to measure the worth of a feature, in achieving the present risk, one approach is to remove the feature and then determine how much the risk has increased. Thus, the risk achievement worth is formally defined to be the increase in risk if the feature were assumed not be there or to be failed. Another parameter of interest for this analysis is the shutdown risk increase. The shutdown risk achievement worth must be incorporated into the accident sequence risk achievement worth to arrive at an optimal set of plant specific AOTs

  9. Outage analysis for underlay cognitive networks using incremental regenerative relaying

    KAUST Repository

    Tourki, Kamel

    2013-02-01

    Cooperative relay technology has recently been introduced into cognitive radio (CR) networks to enhance the network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service (QoS) of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. Analysis is conducted for two schemes, referred to as the channel-state information (CSI)-based and fault-tolerant schemes, respectively, where different amounts of CSI were considered. We first provide the exact cumulative distribution function (cdf) of the received signal-to-noise ratio (SNR) over each hop with colocated relays. Then, the cdf\\'s are used to determine a very accurate closed-form expression for the outage probability for a transmission rate $R$. In a high-SNR region, a floor of the secondary outage probability occurs, and we derive its corresponding expression. We validate our analysis by showing that the simulation results coincide with our analytical results in Rayleigh fading channels. © 1967-2012 IEEE.

  10. APPROACH TO ASSESSING THE PREPAREDNESS OF HOSPITALS TO POWER OUTAGES

    Directory of Open Access Journals (Sweden)

    Lenka BREHOVSKÁ

    2017-06-01

    Full Text Available Within the secondary impacts of electricity blackouts, it is necessary to pay attention to facilities providing medical care for the population, namely the hospitals. Hospitals represent a key position in the provision of health care also in times of crisis. These facilities must provide constant care; it is therefore essential that the preparedness of such facilities is kept at a high level. The basic aim of this article is to analyse the preparedness of hospitals to power outages (power failures, blackouts within a pilot study. On that basis, a SWOT analysis is used to determine strengths and weaknesses of the system of preparedness of hospitals to power outages and solutions for better security of hospitals are defined. The sample investigated consists of four hospitals founded by the Regional Authority (hospitals Nos. 1-4 and one hospital founded by the Ministry of Health of the Czech Republic (hospital No. 5. The results of the study shows that most weaknesses of the preparedness of hospitals are represented by inadequately addressed reserves of fuel for the main backup power supply, poor knowledge of employees who are insufficiently retrained, and old backup power supplies (even 35 years in some cases.

  11. Pumping life

    DEFF Research Database (Denmark)

    Sitsel, Oleg; Dach, Ingrid; Hoffmann, Robert Daniel

    2012-01-01

    The name PUMPKIN may suggest a research centre focused on American Halloween traditions or the investigation of the growth of vegetables – however this would be misleading. Researchers at PUMPKIN, short for Centre for Membrane Pumps in Cells and Disease, are in fact interested in a large family o......’. Here we illustrate that the pumping of ions means nothing less than the pumping of life....

  12. Operating experience with an on-line vibration control system for PWR main coolant pumps

    International Nuclear Information System (INIS)

    Runkel, J.; Stegemann, D.; Vortriede, A.

    1996-01-01

    The main circulation pumps are key components of nuclear power plants with pressurized water reactors, because the availability of the main circulation pumps has a direct influence on the availability and electrical output of the entire plant. The on-line automatic vibration control system ASMAS was developed for early failure detection during the normal operation of the main circulation pumps in order to avoid unexpected outages and to establish the possibility of preventive maintenance of the pumps. This system is permanently and successfully operating in three German 1300 MW el NPP's with PWR and has been successfully tested in a 350 MW el NPP with a PWR. (orig.)

  13. Operating experience with an on-line vibration control system for PWR main coolant pumps

    International Nuclear Information System (INIS)

    Runkel, J.; Stegemann, D.; Vortriede, A.

    1998-01-01

    The main circulation pumps are key components of nuclear power plants with pressurized water reactors (PWRs), because the availability of the main circulation pumps has a direct influence on the availability and electrical output of the entire plant. The on-line automatic vibration control system ASMAS was developed for early failure detection during the normal operation of the main circulation pumps in order to avoid unexpected outages and to establish the possibility of preventive maintenance of the pumps. This system is permanently and successfully operating in three German 1300 MW e1 NPP's with PWR and has been successfully tested in a 350 MW e1 NPP with a PWR. (orig.)

  14. Seasonal and Local Characteristics of Lightning Outages of Power Distribution Lines in Hokuriku Area

    Science.gov (United States)

    Sugimoto, Hitoshi; Shimasaki, Katsuhiko

    The proportion of the lightning outages in all outages on Japanese 6.6kV distribution lines is high with approximately 20 percent, and then lightning protections are very important for supply reliability of 6.6kV lines. It is effective for the lightning performance to apply countermeasures in order of the area where a large number of the lightning outages occur. Winter lightning occurs in Hokuriku area, therefore it is also important to understand the seasonal characteristics of the lightning outages. In summer 70 percent of the lightning outages on distribution lines in Hokuriku area were due to sparkover, such as power wire breakings and failures of pole-mounted transformers. However, in winter almost half of lightning-damaged equipments were surge arrester failures. The number of the lightning outages per lightning strokes detected by the lightning location system (LLS) in winter was 4.4 times larger than that in summer. The authors have presumed the occurrence of lightning outages from lightning stroke density, 50% value of lightning current and installation rate of lightning protection equipments and overhead ground wire by multiple regression analysis. The presumed results suggest the local difference in the lightning outages.

  15. Use of collaboration software to improve nuclear power plant outage management

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn

    2015-02-01

    Nuclear Power Plant (NPP) refueling outages create some of the most challenging activities the utilities face in both tracking and coordinating thousands of activities in a short period of time. Other challenges, including nuclear safety concerns arising from atypical system configurations and resource allocation issues, can create delays and schedule overruns, driving up outage costs. Today the majority of the outage communication is done using processes that do not take advantage of advances in modern technologies that enable enhanced communication, collaboration and information sharing. Some of the common practices include: runners that deliver paper-based requests for approval, radios, telephones, desktop computers, daily schedule printouts, and static whiteboards that are used to display information. Many gains have been made to reduce the challenges facing outage coordinators; however; new opportunities can be realized by utilizing modern technological advancements in communication and information tools that can enhance the collective situational awareness of plant personnel leading to improved decision-making. Ongoing research as part of the Light Water Reactor Sustainability Program (LWRS) has been targeting NPP outage improvement. As part of this research, various applications of collaborative software have been demonstrated through pilot project utility partnerships. Collaboration software can be utilized as part of the larger concept of Computer-Supported Cooperative Work (CSCW). Collaborative software can be used for emergent issue resolution, Outage Control Center (OCC) displays, and schedule monitoring. Use of collaboration software enables outage staff and subject matter experts (SMEs) to view and update critical outage information from any location on site or off.

  16. Outage Analysis of Spectrum-Sharing over M-Block Fading with Sensing Information

    KAUST Repository

    Alabbasi, Abdulrahman; Rezki, Zouheir; Shihada, Basem

    2016-01-01

    on the outage probability with tractable expressions. These bounds allow us to derive the exact diversity order of the secondary user’s outage probability. To further enhance the system’s performance, we also investigate the impact of including the sensing

  17. Allowable outage analysis for the LOFT CIS and reflood assist bypass valves

    International Nuclear Information System (INIS)

    Trainer, J.E.; Matthews, S.D.

    1977-06-01

    To determine the outage time allowable for a typical 1 of 2 redundant valve configuration, a Markov model was created to analyze the various operating states for the valves. Since no performance criteria have been specified, an availability model was constructed with regard to the valve outage

  18. Underlay Cognitive Radio Systems with Improper Gaussian Signaling: Outage Performance Analysis

    KAUST Repository

    Amin, Osama

    2016-03-29

    Improper Gaussian signaling has the ability over proper (conventional) Gaussian signaling to improve the achievable rate of systems that suffer from interference. In this paper, we study the impact of using improper Gaussian signaling on the performance limits of the underlay cognitive radio system by analyzing the achievable outage probability of both the primary user (PU) and secondary user (SU). We derive the exact outage probability expression of the SU and construct upper and lower bounds of the PU outage probability which results in formulating an approximate expression of the PU outage probability. This allows us to design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the derived expressions for both the SU and the PU and the corresponding adaptive algorithms by numerical results.

  19. Estimating Power Outage Cost based on a Survey for Industrial Customers

    Science.gov (United States)

    Yoshida, Yoshikuni; Matsuhashi, Ryuji

    A survey was conducted on power outage cost for industrial customers. 5139 factories, which are designated energy management factories in Japan, answered their power consumption and the loss of production value due to the power outage in an hour in summer weekday. The median of unit cost of power outage of whole sectors is estimated as 672 yen/kWh. The sector of services for amusement and hobbies and the sector of manufacture of information and communication electronics equipment relatively have higher unit cost of power outage. Direct damage cost from power outage in whole sectors reaches 77 billion yen. Then utilizing input-output analysis, we estimated indirect damage cost that is caused by the repercussion of production halt. Indirect damage cost in whole sectors reaches 91 billion yen. The sector of wholesale and retail trade has the largest direct damage cost. The sector of manufacture of transportation equipment has the largest indirect damage cost.

  20. Underlay Cognitive Radio Systems with Improper Gaussian Signaling: Outage Performance Analysis

    KAUST Repository

    Amin, Osama; Abediseid, Walid; Alouini, Mohamed-Slim

    2016-01-01

    Improper Gaussian signaling has the ability over proper (conventional) Gaussian signaling to improve the achievable rate of systems that suffer from interference. In this paper, we study the impact of using improper Gaussian signaling on the performance limits of the underlay cognitive radio system by analyzing the achievable outage probability of both the primary user (PU) and secondary user (SU). We derive the exact outage probability expression of the SU and construct upper and lower bounds of the PU outage probability which results in formulating an approximate expression of the PU outage probability. This allows us to design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the derived expressions for both the SU and the PU and the corresponding adaptive algorithms by numerical results.

  1. Exact Outage Probability of Dual-Hop CSI-Assisted AF Relaying Over Nakagami-m Fading Channels

    KAUST Repository

    Xia, Minghua; Aissa, Sonia; Wu, Yik-Chung

    2012-01-01

    to evaluate the outage performance of the system under study. The analytical results of outage probability coincide exactly with Monte-Carlo simulation results and outperform the previously reported upper bounds in the low and medium SNR regions.

  2. The Role of Occupational Health and Safety in Complex Outage Services to NPPs

    International Nuclear Information System (INIS)

    Rozman, A.; Androjna, A.

    2010-01-01

    Meeting outage schedules in NPPs which are increasingly demanding, apart from all other aspects, introduces a new perspective on occupational health and safety (OHS). Not only is the OHS a constituent part of a plant's overall outage management, it above all dictates paramount objectives to outage service providers. The paper reviews the impacts of reductions of outage durations on OHS and presents related experience of the leading Slovenian outage services provider, NUMIP d.o.o. over the last ten years. The company is now getting prepared for its 12th outage at Krsko NPP in 2010, and has not have recorded a major injury so far, even though these projects engaged over 450 people at a time on-site. To achieve such results, a lot of emphasis is being put onto OHS management prior to and during outages. A certified OHSAS 18001 system has been established and implemented to further support preparation and execution of NUMIP's outage activities at Krsko NPP, and also for other projects. An effective continuous improvement system is built into the project, providing for implementation of lessons learned from domestic and foreign plants. To illustrate the topic in more detail, a case on a Seismic protection of polar crane project is presented. It took place in the 2009 Outage and has certainly been one of the most demanding projects from the OHS point of view for NUMIP so far. The paper aims at contributing to a better understanding of the role of effective management of OHS on the side of a service provider, and, consequently, in the overall outage success of a plant.(author).

  3. Protective Controller against Cascade Outages with Selective Harmonic Compensation Function

    Science.gov (United States)

    Abramovich, B. N.; Kuznetsov, P. A.; Sychev, Yu A.

    2018-05-01

    The paper presents data on the power quality and development of protective devices for the power networks with distributed generation (DG).The research has shown that power quality requirements for DG networks differ from conventional ones. That is why main tendencies, protective equipment and filters should be modified. There isa developed algorithm for detection and prevention of cascade outages that can lead to the blackoutin DG networks and there was a proposed structural scheme for a new active power filter for selective harmonics compensation. Analysis of these theories and equipment led to the development of protective device that could monitor power balance and cut off non-important consumers. The last part of the article describes a microcontroller prototype developed for connection to the existing power station control center.

  4. Braess's paradox in oscillator networks, desynchronization and power outage

    International Nuclear Information System (INIS)

    Witthaut, Dirk; Timme, Marc

    2012-01-01

    Robust synchronization is essential to ensure the stable operation of many complex networked systems such as electric power grids. Increasing energy demands and more strongly distributing power sources raise the question of where to add new connection lines to the already existing grid. Here we study how the addition of individual links impacts the emergence of synchrony in oscillator networks that model power grids on coarse scales. We reveal that adding new links may not only promote but also destroy synchrony and link this counter-intuitive phenomenon to Braess's paradox known for traffic networks. We analytically uncover its underlying mechanism in an elementary grid example, trace its origin to geometric frustration in phase oscillators, and show that it generically occurs across a wide range of systems. As an important consequence, upgrading the grid requires particular care when adding new connections because some may destabilize the synchronization of the grid—and thus induce power outages. (paper)

  5. Outage analysis for underlay relay-assisted cognitive networks

    KAUST Repository

    Tourki, Kamel; Qaraqe, Khalid A.; Alouini, Mohamed-Slim

    2012-01-01

    Cooperative relay technology was recently introduced into cognitive radio networks in order to enhance network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. We first provide the exact cumulative density function (CDF) of received signal-to-noise (SNR) over each hop with co-located relays. Then, the CDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. We validate our analysis by showing that simulation results coincide with our analytical results in Rayleigh fading channels. © 2012 IEEE.

  6. Asymmetric Hardware Distortions in Receive Diversity Systems: Outage Performance Analysis

    KAUST Repository

    Javed, Sidrah; Amin, Osama; Ikki, Salama S.; Alouini, Mohamed-Slim

    2017-01-01

    This paper studies the impact of asymmetric hardware distortion (HWD) on the performance of receive diversity systems using linear and switched combining receivers. The asymmetric attribute of the proposed model motivates the employment of improper Gaussian signaling (IGS) scheme rather than the traditional proper Gaussian signaling (PGS) scheme. The achievable rate performance is analyzed for the ideal and non-ideal hardware scenarios using PGS and IGS transmission schemes for different combining receivers. In addition, the IGS statistical characteristics are optimized to maximize the achievable rate performance. Moreover, the outage probability performance of the receive diversity systems is analyzed yielding closed form expressions for both PGS and IGS based transmission schemes. HWD systems that employ IGS is proven to efficiently combat the self interference caused by the HWD. Furthermore, the obtained analytic expressions are validated through Monte-Carlo simulations. Eventually, non-ideal hardware transceivers degradation and IGS scheme acquired compensation are quantified through suitable numerical results.

  7. Outage analysis for underlay relay-assisted cognitive networks

    KAUST Repository

    Tourki, Kamel

    2012-12-01

    Cooperative relay technology was recently introduced into cognitive radio networks in order to enhance network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. We first provide the exact cumulative density function (CDF) of received signal-to-noise (SNR) over each hop with co-located relays. Then, the CDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. We validate our analysis by showing that simulation results coincide with our analytical results in Rayleigh fading channels. © 2012 IEEE.

  8. Asymmetric Hardware Distortions in Receive Diversity Systems: Outage Performance Analysis

    KAUST Repository

    Javed, Sidrah

    2017-02-22

    This paper studies the impact of asymmetric hardware distortion (HWD) on the performance of receive diversity systems using linear and switched combining receivers. The asymmetric attribute of the proposed model motivates the employment of improper Gaussian signaling (IGS) scheme rather than the traditional proper Gaussian signaling (PGS) scheme. The achievable rate performance is analyzed for the ideal and non-ideal hardware scenarios using PGS and IGS transmission schemes for different combining receivers. In addition, the IGS statistical characteristics are optimized to maximize the achievable rate performance. Moreover, the outage probability performance of the receive diversity systems is analyzed yielding closed form expressions for both PGS and IGS based transmission schemes. HWD systems that employ IGS is proven to efficiently combat the self interference caused by the HWD. Furthermore, the obtained analytic expressions are validated through Monte-Carlo simulations. Eventually, non-ideal hardware transceivers degradation and IGS scheme acquired compensation are quantified through suitable numerical results.

  9. Paste pumping and deposition field trials and concepts on Syncrude's dewatered mature fine tailings MFT centrifuge cake

    Energy Technology Data Exchange (ETDEWEB)

    Lahaie, R. [Syncrude Canada Ltd., Edmonton, AB (Canada); Ahmed, I.; Labelle, M.; Brown, R. [Golder Paste Technology, Sudbury, ON (Canada)

    2009-07-01

    This presentation discussed a paste pumping and deposition field study conducted on dewatered mature fine tailings (MFT) located at Syncrude's Mildred Lake operation. Bench scale rheological examinations of centrifuge cakes and design field testing are used to determine the pumpability of MFT centrifuge cakes. The study included a transportation assessment for the conveyor and positive displacement pumps and pipelines, as well as geotechnical and environmental analyses of bulk materials. Flocculant optimization and centrifuge operational parameter assessments were conducted. Pressure differential and flow rate data were captured in the field studies in order to determine pipeline friction loss. The study showed that pipe friction factors can be obtained using the Bingham plastic model. A natural deposition angle was determined for the MFT centrifuged cake. The study showed that the cake must be sheared in order to reduce yield stress before pumping. It was concluded that displacement pumps can be used to reduced pipeline friction factors. tabs., figs.

  10. Liquid metals pumping

    International Nuclear Information System (INIS)

    Le Frere, J.P.

    1984-01-01

    Pumps used to pump liquid metals depend on the liquid metal and on the type of application concerned. One deals more particularly with electromagnetic pumps, the main pumps used with mechanical pumps. To pump sodium in the nuclear field, these two types of pumps are used; the pumps of different circuits of Super Phenix are presented and described [fr

  11. Electromagnetic pump

    International Nuclear Information System (INIS)

    Ito, Koji; Suetake, Norio; Aizawa, Toshie; Nakasaki, Masayoshi

    1998-01-01

    The present invention provides an electromagnetic pump suitable to a recycling pump for liquid sodium as coolants of an FBR type reactor. Namely, a stator module of the electromagnetic pump of the present invention comprises a plurality of outer laminate iron core units and outer stator modules stacked alternately in the axial direction. With such a constitution, even a long electromagnetic pump having a large number of outer stator coils can be manufactured without damaging electric insulation of the outer stator coils. In addition, the inner circumferential surface of the outer laminate iron cores is urged and brought into contact with the outer circumferential surface of the outer duct by an elastic material. With such a constitution, Joule loss heat generated in the outer stator coils and internal heat generated in the outer laminate iron cores can be released to an electroconductive fluid flowing the inner circumference of the outer duct by way of the outer duct. (I.S.)

  12. Electrokinetic pump

    Science.gov (United States)

    Patel, Kamlesh D.

    2007-11-20

    A method for altering the surface properties of a particle bed. In application, the method pertains particularly to an electrokinetic pump configuration where nanoparticles are bonded to the surface of the stationary phase to alter the surface properties of the stationary phase including the surface area and/or the zeta potential and thus improve the efficiency and operating range of these pumps. By functionalizing the nanoparticles to change the zeta potential the electrokinetic pump is rendered capable of operating with working fluids having pH values that can range from 2-10 generally and acidic working fluids in particular. For applications in which the pump is intended to handle highly acidic solutions latex nanoparticles that are quaternary amine functionalized can be used.

  13. Enhanced outage prediction modeling for strong extratropical storms and hurricanes in the Northeastern United States

    Science.gov (United States)

    Cerrai, D.; Anagnostou, E. N.; Wanik, D. W.; Bhuiyan, M. A. E.; Zhang, X.; Yang, J.; Astitha, M.; Frediani, M. E.; Schwartz, C. S.; Pardakhti, M.

    2016-12-01

    The overwhelming majority of human activities need reliable electric power. Severe weather events can cause power outages, resulting in substantial economic losses and a temporary worsening of living conditions. Accurate prediction of these events and the communication of forecasted impacts to the affected utilities is necessary for efficient emergency preparedness and mitigation. The University of Connecticut Outage Prediction Model (OPM) uses regression tree models, high-resolution weather reanalysis and real-time weather forecasts (WRF and NCAR ensemble), airport station data, vegetation and electric grid characteristics and historical outage data to forecast the number and spatial distribution of outages in the power distribution grid located within dense vegetation. Recent OPM improvements consist of improved storm classification and addition of new predictive weather-related variables and are demonstrated using a leave-one-storm-out cross-validation based on 130 severe extratropical storms and two hurricanes (Sandy and Irene) in the Northeast US. We show that it is possible to predict the number of trouble spots causing outages in the electric grid with a median absolute percentage error as low as 27% for some storm types, and at most around 40%, in a scale that varies between four orders of magnitude, from few outages to tens of thousands. This outage information can be communicated to the electric utility to manage allocation of crews and equipment and minimize the recovery time for an upcoming storm hazard.

  14. Reliabilty worth: Development of a relationship with outage magnitude, duration and frequency

    International Nuclear Information System (INIS)

    Turner, F.P.P.; Katrichak, A.M.; Dwyer, A.; Edwards, D.; Ibrahim, A.

    1994-01-01

    British Columbia Hydro's Worth Project Team was founded to determine values for reliability for reference in evaluation of investment and operating decisions. Work to date has produced key preliminary values for specific outages and concepts for the shape of the relationship between value and these determinates of reliability worth, frequency, magnitude and duration. These values and concepts are described. The values are developed through an iterative, trial and refinement approach. The approach incorporates direct input from customers, common sense and judgement, and micro- and macro-economic concepts. Reliability worth values for reduced or prevented outages are presented for residential, commercial, small industrial and mixed sectors and various outage durations. Reliability worth values were obtained through customer surveys. Limitations of the reliability worth value are numerous and are listed. Study of cost vs magnitude of interruption using microeconomic models has shown that costly system improvements to reduce the possibility of widespread outages may not be justified. The case of exceptionally large area outages (blackouts) is examined. The cost vs frequency relationship was examined in terms of the economic concept of utility or satisfaction. Different loss/frequency characteristics are demonstrated for different customer classes. Customer value for reduced outage duration is expressed in a curve with flatter slope than that for eliminated outages. 2 refs., 6 figs

  15. Use of a Computerized Tool (ORAM) to Help Manage Outage Safety and Risk at NPP Krsko

    International Nuclear Information System (INIS)

    Spiler, J.; Basic, I.; Vrbanic, I.; Fifnja, I.; Kastelan, M.; Dagan, W. J.; Shanley, L. B.; Naum, T. J.

    1998-01-01

    Outage Risk Assessment and Management (ORAM) is a computerized methodology developed by the U.S. Electric Power Research Institute (EPRI) to help Nuclear Power Plant personnel manage the risk and safety associated with refueling and forced plant outages. Today, over 60 plants including NPP Krsko are using ORAM during the preparation and performance of plant outages. In fact, many plants are attributing much of the reductions in the duration of refueling outages to the use of ORAM. The success of the ORAM methodology is the capability to provide plant and management personnel with understandable results from both deterministic evaluations of plant safety and quantitative risk assessments. The Nuklearna Elektrarna Krsko (NEK) use of ORAM involves both of these approaches. The deterministic portion of ORAM is used to model the NPP Krsko Shutdown Technical Specifications and administrative considerations. The probabilistic portion of ORAM uses industry and NEK specific initiating events and other risk elements pertaining to shutdown to derive a quantitative risk assessment for various end states, including core damage and RCS boiling. This paper expands on the value of each approach and demonstrates the benefits of combining these elements in the decision-making process. Another key advantage of ORAM is the ability to apply the methodology to specific outages. Since no outage is identical, this provides tremendous benefits to plant personnel for managing the safety and risk of a particular outage. ORAM does this ba organizing all of the various plant configurations and equipment unavailability windows into numerous plant states. Furthermore, ORAM evaluations can be a utomated b y interfacing with outage scheduling software programs such as Primavera. For each plant state, the deterministic and the probabilistic logic evaluations are applied. This paper will demonstrate the ORAM evaluation for an actual NPP Krsko outage. (author)

  16. Pumps and pump facilities. 2. ed.

    International Nuclear Information System (INIS)

    Bohl, W.; Bauerfeind, H.; Gutmann, G.; Leuschner, G.; Matthias, H.B.; Mengele, R.; Neumaier, R.; Vetter, G.; Wagner, W.

    1981-01-01

    This book deals with the common fundamental aspects of liquid pumps and gives an exemplary choice of the most important kinds of pumps. The scientific matter is dealt with by means of practical mathematical examples among other ways of presenting the matter. Survey of contents: Division on main operational data of pumps - pipe characteristics - pump characteristics - suction behaviour of the pumps - projecting and operation of rotary pumps - boiler feed pumps - reactor feed pumps - oscillating positive-displacement pumps - eccentric spiral pumps. (orig./GL) [de

  17. Outage performance analysis of underlay cognitive RF and FSO wireless channels

    KAUST Repository

    Ansari, Imran Shafique; Abdallah, Mohamed M.; Alouini, Mohamed-Slim; Qaraqe, Khalid A.

    2014-01-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channel cascaded with a free-space optical (FSO) link is presented. For the RF link, an underlay cognitive network

  18. A Unified Simulation Approach for the Fast Outage Capacity Evaluation over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2016-01-01

    The outage capacity (OC) is among the most important performance metrics of communication systems over fading channels. The evaluation of the OC, when equal gain combining (EGC) or maximum ratio combining (MRC) diversity techniques are employed

  19. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  20. OPG's approach of crediting natural circulation in outage heat sinks

    International Nuclear Information System (INIS)

    Fung, K.K.; Mackinnon, J.C.

    2001-01-01

    A review of crediting natural circulation as a backup means of removing the reactor core decay heat during an outage in Ontario Power Generation's nuclear stations was completed in 2000. The objective was to define the configurations and conditions under which natural circulation can be confidently credited as an effective heat transport mechanism for use in shutdown heat sink management. The project was an interdisciplinary program, and involved analyses in the areas of heat transport system thermalhydaulics, fuel and fuel channel thermal and mechanical behaviour, radiation physics, and probabilistic risks. The assessment shows that it is economically acceptable to credit natural circulation as a backup means of removing the core decay heat whenever the no fuel failure criteria are met. The economic risks associated with such a potential use decrease with time after shutdown. The waiting times after shutdown when there would be various levels of risks of damaging the pressure tubes and fuel bundles were derived for use in planning maintenance activities so as to minimize the economic risks. (author)

  1. Failed fuel rod detection system and computerized manipulator during outages

    International Nuclear Information System (INIS)

    Boehm, H.H.; Foerch, H.

    1984-01-01

    During regular outages spent fuel assemblies need to be replaced and relocated within the core. Defective fuel rods in particular fuel assemblies have to be removed from further service and before delivery of such faulty fuel assemblies to a reprocessing plant. The system which Brown Boveri Reaktor GmbH and Krautkraemer have developed in the Federal Republic of Germany is capable of directly locating the defective rods in a proper fuel assembly. Inspection times are comparable to those of standard sipping methods, with the advantages of immediately available results and direct identification of the defective fuel rods. During the repair of fuel assemblies this system allows withdrawal of individual defective rods. With the sipping method all the fuel rods of a defective fuel assembly need to be removed and inspected by eddy current testing. During steam generator inspection and repair personnel are exposed to ample radiation. A remotely controlled, computerized manipulator was used to significantly reduce the radiation dose by automating steps in the procedures; at the same time inspection and repair times were reduced. The main features of the manipulator are a rigid component construction of the leg and two arms, and a resolver control for horizontal and vertical motion that enables rapid and accurate access to a desired tube (author)

  2. Verification and Enhancement of VIIRS Day-Night Band (DNB) Power Outage Detection Product

    Science.gov (United States)

    Burke, Angela; Schultz, Lori A.; Omitaomu, Olufemi; Molthan, Andrew L.; Cole, Tony; Griffin, Robert

    2017-01-01

    This case study of Hurricane Matthew (October 2016) uses the NASA Short-Term Prediction Research and Transition (SPoRT) Center DNB power outage product (using GSFC VIIRS DNB preliminary Black Marble product, Roman et al.. 2017) and 2013 LandScan Global population data to look for correlations between the post-event %-of-normal radiance and the utility company-reported outage numbers (obtained from EAGLE-1).

  3. Fluidic pumps

    International Nuclear Information System (INIS)

    Priestman, G.H.

    1990-01-01

    A fluidic pump has primary and secondary vessels connected by a pipe, a displacement vessel having liquid to be delivered through a pipe via a rectifier provided with a feed tank. A drive unit delivers pressure fluid to a line to raise liquid and compress trapped gas or liquid in the space, including the pipe between the liquids in the two vessels and thus drive liquid out of the displacement vessel. The driving gas is therefore separated by the barrier liquid and the trapped gas or liquid from the liquid to be pumped which liquid could be e.g. radioactive. (author)

  4. Pumped storage

    International Nuclear Information System (INIS)

    Strauss, P.L.

    1991-01-01

    The privately financed 1,000 MW Rocky Point Pumped Storage Project located in central Colorado, USA, will be one of the world's highest head, 2,350 feet reversible pump/turbine projects. The project will offer an economical supply of peaking power and spinning reserve power to Colorado and other southwestern states. This paper describes how the project will be made compatible with the environmental conditions in the project area and the type of terrestrial mitigation measures that are being proposed for those situations where the project impacts the environment, either temporarily or permanently

  5. Estimating the spatial distribution of power outages during hurricanes in the Gulf coast region

    International Nuclear Information System (INIS)

    Han, S.-R.; Guikema, Seth D.; Quiring, Steven M.; Lee, Kyung-Ho; Rosowsky, David; Davidson, Rachel A.

    2009-01-01

    Hurricanes have caused severe damage to the electric power system throughout the Gulf coast region of the US, and electric power is critical to post-hurricane disaster response as well as to long-term recovery for impacted areas. Managing power outage risk and preparing for post-storm recovery efforts requires accurate methods for estimating the number and location of power outages. This paper builds on past work on statistical power outage estimation models to develop, test, and demonstrate a statistical power outage risk estimation model for the Gulf Coast region of the US. Previous work used binary hurricane-indicator variables representing particular hurricanes in order to achieve a good fit to the past data. To use these models for predicting power outages during future hurricanes, one must implicitly assume that an approaching hurricane is similar to the average of the past hurricanes. The model developed in this paper replaces these indicator variables with physically measurable variables, enabling future predictions to be based on only well-understood characteristics of hurricanes. The models were developed using data about power outages during nine hurricanes in three states served by a large, investor-owned utility company in the Gulf Coast region

  6. Comparison and validation of statistical methods for predicting power outage durations in the event of hurricanes.

    Science.gov (United States)

    Nateghi, Roshanak; Guikema, Seth D; Quiring, Steven M

    2011-12-01

    This article compares statistical methods for modeling power outage durations during hurricanes and examines the predictive accuracy of these methods. Being able to make accurate predictions of power outage durations is valuable because the information can be used by utility companies to plan their restoration efforts more efficiently. This information can also help inform customers and public agencies of the expected outage times, enabling better collective response planning, and coordination of restoration efforts for other critical infrastructures that depend on electricity. In the long run, outage duration estimates for future storm scenarios may help utilities and public agencies better allocate risk management resources to balance the disruption from hurricanes with the cost of hardening power systems. We compare the out-of-sample predictive accuracy of five distinct statistical models for estimating power outage duration times caused by Hurricane Ivan in 2004. The methods compared include both regression models (accelerated failure time (AFT) and Cox proportional hazard models (Cox PH)) and data mining techniques (regression trees, Bayesian additive regression trees (BART), and multivariate additive regression splines). We then validate our models against two other hurricanes. Our results indicate that BART yields the best prediction accuracy and that it is possible to predict outage durations with reasonable accuracy. © 2011 Society for Risk Analysis.

  7. Outages 1999 and 2000, investments in safety and long-term operation of NE Krsko

    International Nuclear Information System (INIS)

    Sirola, P.; Krajnc, J.; Androjna, F.

    1999-01-01

    Plant outage is an important part of nuclear power plant operation. During that time the conditions are established for the performance of specific activities, such as refueling, tests, inspections, preventive and corrective maintenance and modifications, that are intended to confirm proper condition and availability of safety and other important components and improve overall plant safety and reliability. It is well know that in Nuclear Power Plant Krsko (Nuklearna elektrarna Krsko NEK) during Outage 2000 new Steam Generators (SGs) will be placed in service, while Outage '99 was used for preparatory works. But the importance of those two outages is even greater, because they are implementing a broad number of improvements and establishing a basis for long-term plant operation. Outage '99 required very detailed planning to assure a good control over the outage activities and operational plant systems necessary for safe shutdown. Numerous activities took place in a relatively narrow space in the Reactor Building. Some of these activities will have a big significance for the future. The article treats the status update and summarizes the specifics and importance of the mentioned activities to long-term plant safe and reliable operation.(author)

  8. Outage Analysis of Spectrum-Sharing over M-Block Fading with Sensing Information

    KAUST Repository

    Alabbasi, Abdulrahman

    2016-07-13

    Future wireless technologies, such as, 5G, are expected to support real-time applications with high data throughput, e.g., holographic meetings. From a bandwidth perspective, cognitive radio is a promising technology to enhance the system’s throughput via sharing the licensed spectrum. From a delay perspective, it is well known that increasing the number of decoding blocks will improve the system robustness against errors, while increasing the delay. Therefore, optimally allocating the resources to determine the tradeoff of tuning the length of decoding blocks while sharing the spectrum is a critical challenge for future wireless systems. In this work, we minimize the targeted outage probability over the block-fading channels while utilizing the spectrum-sharing concept. The secondary user’s outage region and the corresponding optimal power are derived, over twoblocks and M-blocks fading channels. We propose two suboptimal power strategies and derive the associated asymptotic lower and upper bounds on the outage probability with tractable expressions. These bounds allow us to derive the exact diversity order of the secondary user’s outage probability. To further enhance the system’s performance, we also investigate the impact of including the sensing information on the outage problem. The outage problem is then solved via proposing an alternating optimization algorithm, which utilizes the verified strict quasiconvex structure of the problem. Selected numerical results are presented to characterize the system’s behavior and show the improvements of several sharing concepts.

  9. Estimating the Propagation of Interdependent Cascading Outages with Multi-Type Branching Processes

    Energy Technology Data Exchange (ETDEWEB)

    Qi, Junjian; Ju, Wenyun; Sun, Kai

    2016-01-01

    In this paper, the multi-type branching process is applied to describe the statistics and interdependencies of line outages, the load shed, and isolated buses. The offspring mean matrix of the multi-type branching process is estimated by the Expectation Maximization (EM) algorithm and can quantify the extent of outage propagation. The joint distribution of two types of outages is estimated by the multi-type branching process via the Lagrange-Good inversion. The proposed model is tested with data generated by the AC OPA cascading simulations on the IEEE 118-bus system. The largest eigenvalues of the offspring mean matrix indicate that the system is closer to criticality when considering the interdependence of different types of outages. Compared with empirically estimating the joint distribution of the total outages, good estimate is obtained by using the multitype branching process with a much smaller number of cascades, thus greatly improving the efficiency. It is shown that the multitype branching process can effectively predict the distribution of the load shed and isolated buses and their conditional largest possible total outages even when there are no data of them.

  10. Verification and Enhancement of VIIRS Day-Night Band Power Outage Detection Product

    Science.gov (United States)

    Burke, A.; Schultz, L. A.; Omitaomu, O.; Molthan, A.; Cole, T.; Griffin, R.

    2017-12-01

    The NASA SPoRT (Short-term Prediction Research and Transition) Center has collaborated with scientists at NASA Goddard Space Flight Center to create a power outage detection product from radiance data obtained by the VIIRS (Visible Infrared Imaging Radiometer Suite) sensor aboard the Suomi-NPP satellite. This product uses a composite of pre-event radiance values from the VIIRS Day-Night Band to establish a baseline of "normal" nighttime lights for a study area. Then, after a severe weather event or other disaster, post-event images are compared to the composite to generate a percent-of-normal radiance product to identify areas that are experiencing outages and to aid in disaster response and monitor recovery. This project will use ground-truth county-level outage data provided by Oak Ridge National Laboratory (ORNL) in order validate the product and to establish a percent-of-normal threshold for identifying power outages. Once a threshold is found, ORNL's LandScan Global population data will be combined with the product to estimate how many electrical customers are being affected by power outages after a disaster. Two case studies will be explored to examine power outage recovery after severe weather events, including Hurricane Matthew from 2016 and the Washington D.C. Derecho event of 2012.

  11. Synergistic Use of Nighttime Satellite Data, Electric Utility Infrastructure, and Ambient Population to Improve Power Outage Detections in Urban Areas

    Directory of Open Access Journals (Sweden)

    Tony A. Cole

    2017-03-01

    Full Text Available Natural and anthropogenic hazards are frequently responsible for disaster events, leading to damaged physical infrastructure, which can result in loss of electrical power for affected locations. Remotely-sensed, nighttime satellite imagery from the Suomi National Polar-orbiting Partnership (Suomi-NPP Visible Infrared Imaging Radiometer Suite (VIIRS Day/Night Band (DNB can monitor power outages in disaster-affected areas through the identification of missing city lights. When combined with locally-relevant geospatial information, these observations can be used to estimate power outages, defined as geographic locations requiring manual intervention to restore power. In this study, we produced a power outage product based on Suomi-NPP VIIRS DNB observations to estimate power outages following Hurricane Sandy in 2012. This product, combined with known power outage data and ambient population estimates, was then used to predict power outages in a layered, feedforward neural network model. We believe this is the first attempt to synergistically combine such data sources to quantitatively estimate power outages. The VIIRS DNB power outage product was able to identify initial loss of light following Hurricane Sandy, as well as the gradual restoration of electrical power. The neural network model predicted power outages with reasonable spatial accuracy, achieving Pearson coefficients (r between 0.48 and 0.58 across all folds. Our results show promise for producing a continental United States (CONUS- or global-scale power outage monitoring network using satellite imagery and locally-relevant geospatial data.

  12. Outage Probability Minimization for Energy Harvesting Cognitive Radio Sensor Networks

    Directory of Open Access Journals (Sweden)

    Fan Zhang

    2017-01-01

    Full Text Available The incorporation of cognitive radio (CR capability in wireless sensor networks yields a promising network paradigm known as CR sensor networks (CRSNs, which is able to provide spectrum efficient data communication. However, due to the high energy consumption results from spectrum sensing, as well as subsequent data transmission, the energy supply for the conventional sensor nodes powered by batteries is regarded as a severe bottleneck for sustainable operation. The energy harvesting technique, which gathers energy from the ambient environment, is regarded as a promising solution to perpetually power-up energy-limited devices with a continual source of energy. Therefore, applying the energy harvesting (EH technique in CRSNs is able to facilitate the self-sustainability of the energy-limited sensors. The primary concern of this study is to design sensing-transmission policies to minimize the long-term outage probability of EH-powered CR sensor nodes. We formulate this problem as an infinite-horizon discounted Markov decision process and propose an ϵ-optimal sensing-transmission (ST policy through using the value iteration algorithm. ϵ is the error bound between the ST policy and the optimal policy, which can be pre-defined according to the actual need. Moreover, for a special case that the signal-to-noise (SNR power ratio is sufficiently high, we present an efficient transmission (ET policy and prove that the ET policy achieves the same performance with the ST policy. Finally, extensive simulations are conducted to evaluate the performance of the proposed policies and the impaction of various network parameters.

  13. Flow of a Bingham fluid in a porous bed under the action of a magnetic field: Application to magneto-hemorheology

    Directory of Open Access Journals (Sweden)

    J.C. Misra

    2017-06-01

    Full Text Available The study deals with an investigation of the flow of a Bingham plastic fluid in a porous bed under the action of an external magnetic field. Porosity of the bed has been described by considering Brinkman model. Both steady and pulsatile motion of this non-Newtonian fluid have been analysed. The governing equations are solved numerically by developing a suitable finite difference scheme. As an application of the theory in the field of magneto-hemorheology, the said physical variables have been computed by considering the values of the involved parameters for blood flow in a pathological state, when the system is under the action of an external magnetic field. The pathological state corresponds to a situation, where the lumen of an arterial segment has turned into a porous structure due to formation of blood clots. Numerical estimates are obtained for the velocity profile and volumetric flow rate of blood, as well as for the shear stress, in the case of blood flow in a diseased artery, both the velocity and volumetric flow rate diminish, as the strength of the external magnetic field is enhanced. The study further shows that blood velocity is maximum in the plug (core region. It decreases monotonically as the particles of blood travel towards the wall. The study also bears the potential of providing numerical estimates for many industrial fluids that follow Bingham plastic model, when the values of different parameters are chosen appropriately.

  14. Solar Pump

    Science.gov (United States)

    Pique, Charles

    1987-01-01

    Proposed pump moves liquid by action of bubbles formed by heat of sun. Tube of liquid having boiling point of 100 to 200 degrees F placed at focal axis of cylindrical reflector. Concentrated sunlight boils liquid at focus, and bubbles of vapor rise in tube, carrying liquid along with them. Pressure difference in hot tube sufficient to produce flow in large loop. Used with conventional flat solar heating panel in completely solar-powered heat-storage system.

  15. Upgrading primary heat transport pump seals

    International Nuclear Information System (INIS)

    Graham, T.; Metcalfe, R.; Rhodes, D.; McInnes, D.

    1995-01-01

    Changes in the operating environment at the Bruce-A Nuclear Generating Station created the need for an upgraded Primary Heat Transport Pump (PHTP) seal. In particular, the requirement for low pressure running during more frequent start-ups exposed a weakness of the CAN2 seal and reduced its reliability. The primary concern at Bruce-A was the rotation of the CAN2 No. 2 stators in their holders. The introduction of low pressure running exacerbated this problem, giving rapid wear of the stator back face, overheating, and thermocracking. In addition, the resulting increase in friction between the stator and its holder increased stationary-side hysteresis and thereby changed the seal characteristic to the point where interseal pressure oscillations became prevalent. The resultant increased hysteresis also led to hard rubbing of the seal faces during temperature transients. An upgraded seal was required for improved reliability to avoid forced outages and to reduce maintenance costs. This paper describes this upgraded 'replacement seal' and its performance history. In spite of the 'teething' problems detailed in this paper, there have been no forced outages due to the replacement seal, and in the words of a seal maintenance worker at Bruce-A, 'it allows me to go home and sleep at night instead of worrying about seal failures.' (author)

  16. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  17. Hybrid Cascading Outage Analysis of Extreme Events with Optimized Corrective Actions

    Energy Technology Data Exchange (ETDEWEB)

    Vallem, Mallikarjuna R.; Vyakaranam, Bharat GNVSR; Holzer, Jesse T.; Samaan, Nader A.; Makarov, Yuri V.; Diao, Ruisheng; Huang, Qiuhua; Ke, Xinda

    2017-10-19

    Power system are vulnerable to extreme contingencies (like an outage of a major generating substation) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Some cascading outages are seen within minutes following a major contingency, which may not be captured exclusively using the dynamic simulation of the power system. The utilities plan for contingencies either based on dynamic or steady state analysis separately which may not accurately capture the impact of one process on the other. We address this gap in cascading outage analysis by developing Dynamic Contingency Analysis Tool (DCAT) that can analyze hybrid dynamic and steady state behavior of the power system, including protection system models in dynamic simulations, and simulating corrective actions in post-transient steady state conditions. One of the important implemented steady state processes is to mimic operator corrective actions to mitigate aggravated states caused by dynamic cascading. This paper presents an Optimal Power Flow (OPF) based formulation for selecting corrective actions that utility operators can take during major contingency and thus automate the hybrid dynamic-steady state cascading outage process. The improved DCAT framework with OPF based corrective actions is demonstrated on IEEE 300 bus test system.

  18. Distributed power-line outage detection based on wide area measurement system.

    Science.gov (United States)

    Zhao, Liang; Song, Wen-Zhan

    2014-07-21

    In modern power grids, the fast and reliable detection of power-line outages is an important functionality, which prevents cascading failures and facilitates an accurate state estimation to monitor the real-time conditions of the grids. However, most of the existing approaches for outage detection suffer from two drawbacks, namely: (i) high computational complexity; and (ii) relying on a centralized means of implementation. The high computational complexity limits the practical usage of outage detection only for the case of single-line or double-line outages. Meanwhile, the centralized means of implementation raises security and privacy issues. Considering these drawbacks, the present paper proposes a distributed framework, which carries out in-network information processing and only shares estimates on boundaries with the neighboring control areas. This novel framework relies on a convex-relaxed formulation of the line outage detection problem and leverages the alternating direction method of multipliers (ADMM) for its distributed solution. The proposed framework invokes a low computational complexity, requiring only linear and simple matrix-vector operations. We also extend this framework to incorporate the sparse property of the measurement matrix and employ the LSQRalgorithm to enable a warm start, which further accelerates the algorithm. Analysis and simulation tests validate the correctness and effectiveness of the proposed approaches.

  19. International outage coding system for nuclear power plants. Results of a co-ordinated research project

    International Nuclear Information System (INIS)

    2004-05-01

    The experience obtained in each individual plant constitutes the most relevant source of information for improving its performance. However, experience of the level of the utility, country and worldwide is also extremely valuable, because there are limitations to what can be learned from in-house experience. But learning from the experience of others is admittedly difficult, if the information is not harmonized. Therefore, such systems should be standardized and applicable to all types of reactors satisfying the needs of the broad set of nuclear power plant operators worldwide and allowing experience to be shared internationally. To cope with the considerable amount of information gathered from nuclear power plants worldwide, it is necessary to codify the information facilitating the identification of causes of outages, systems or component failures. Therefore, the IAEA established a sponsored Co-ordinated Research Project (CRP) on the International Outage Coding System to develop a general, internationally applicable system of coding nuclear power plant outages, providing worldwide nuclear utilities with a standardized tool for reporting outage information. This TECDOC summarizes the results of this CRP and provides information for transformation of the historical outage data into the new coding system, taking into consideration the existing systems for coding nuclear power plant events (WANO, IAEA-IRS and IAEA PRIS) but avoiding duplication of efforts to the maximum possible extent

  20. Balance-of-plant outage availability study. Phase I. Extension report. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    Thomasson, F.R.

    1978-09-01

    After completion of the Phase 1 Refueling Outage Availability Study, Babcock and Wilcox and the U.S. Department of Energy entered into a supplemental agreement to perform a balance-of-plant maintenance, inspection, and test study with the cooperation of Duke Power Company and Arkansas Power and Light Company. The objectives were (1) to expand the Phase 1 data base, including balance-of-plant activities, to reduce outage time and increase plant availability and (2) to conduct an onsite review of plant maintenance, practices to complement the utility efforts in reducing outage time and increasing on-line operational time. Data were obtained from (1) observations during the 1977 refueling outage at Oconee 3, (2) review of maintenance practices during the Arkansas Nuclear One, Unit 1, operational cycle in 1977, and (3) selected observations of the 1978 refueling outage at ANO-1. Accumulated data were then reviewed and analyzed to produce a list of improvement recommendations for Oconee 3 and ANO-1 that can be generically applied to plants of similar design and construction.

  1. Balance-of-plant outage availability study. Phase I. Extension report

    International Nuclear Information System (INIS)

    Thomasson, F.R.

    1978-09-01

    After completion of the Phase 1 Refueling Outage Availability Study, Babcock and Wilcox and the U.S. Department of Energy entered into a supplemental agreement to perform a balance-of-plant maintenance, inspection, and test study with the cooperation of Duke Power Company and Arkansas Power and Light Company. The objectives were (1) to expand the Phase 1 data base, including balance-of-plant activities, to reduce outage time and increase plant availability and (2) to conduct an onsite review of plant maintenance, practices to complement the utility efforts in reducing outage time and increasing on-line operational time. Data were obtained from (1) observations during the 1977 refueling outage at Oconee 3, (2) review of maintenance practices during the Arkansas Nuclear One, Unit 1, operational cycle in 1977, and (3) selected observations of the 1978 refueling outage at ANO-1. Accumulated data were then reviewed and analyzed to produce a list of improvement recommendations for Oconee 3 and ANO-1 that can be generically applied to plants of similar design and construction

  2. Pumping behavior of sputter ion pumps

    International Nuclear Information System (INIS)

    Chou, T.S.; McCafferty, D.

    The ultrahigh vacuum requirements of ISABELLE is obtained by distributed pumping stations. Each pumping station consists of 1000 l/s titanium sublimation pump for active gases (N 2 , H 2 , O 2 , CO, etc.), and a 20 l/s sputter ion pump for inert gases (methane, noble gases like He, etc.). The combination of the alarming production rate of methane from titanium sublimation pumps (TSP) and the decreasing pumping speed of sputter ion pumps (SIP) in the ultrahigh vacuum region (UHV) leads us to investigate this problem. In this paper, we first describe the essential physics and chemistry of the SIP in a very clean condition, followed by a discussion of our measuring techniques. Finally measured methane, argon and helium pumping speeds are presented for three different ion pumps in the range of 10 -6 to 10 -11 Torr. The virtues of the best pump are also discussed

  3. Outage Performance of Decode-and-Forward in Two-Way Relaying with Outdated CSI

    KAUST Repository

    Hyadi, Amal

    2015-01-07

    In this paper, we analyze the outage behavior of decode-and-forward relaying in the context of selective two-way cooperative systems. First, a new relay selection metric is proposed to take into consideration both transmission rates and instantaneous link conditions between cooperating nodes. Afterwards, the outage probability of the proposed system is derived for Nakagami-m fading channels in the case when perfect channel state information is available and then extended to the more realistic scenario where the available channel state information (CSI) is outdated due to fast fading. New expressions for the outage probability are obtained, and the impact of imperfect CSI on the performance is evaluated. Illustrative numerical results, Monte Carlo simulations, and comparisons with similar approaches are presented to assess the accuracy of our analytical derivations and confirm the performance gain of the proposed scheme.

  4. Lessons learned in planning ALARA/health physics support for major nuclear power plant outages

    International Nuclear Information System (INIS)

    Gilman, T.R.; Lesinski, M.L.

    1987-01-01

    Although as low as reasonably achievable (ALARA)/health physics is viewed as necessary support for nuclear power plant outage work, it can be the last area to which attention is given in preparing for a large-scope outage. Inadequate lead times cause last-minute preparations resulting in delays in planned work. The Dresden Unit 3 Recirculation Piping Replacement Project is examined from a planning viewpoint. The attention that was given the various areas of a comprehensive ALARA/health physics program is examined, and approximate recommended lead times are discussed. The discussion will follow a chronological path from project inception to the beginning stages of outage work. Initially, the scope of work needs to be assessed by individuals familiar with similar projects of equivalent magnitude. Those individuals need to be health physics professionals who understand the particular utility and/or the site's way of doing business. They should also possess a good understanding of preferred industry practices

  5. Thermal Hydraulic Assessment for Loss of SDCS Event During the Outage of CANDU Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jonghyun [Gnest, Inc. Taejon (Korea, Republic of); Lee, Kwangho; Oh, Haechol; Jun, Hwangyong [KEPRI, Taejon (Korea, Republic of)

    2006-07-01

    During the outage(overhaul) of the nuclear power plant, there are several operating states other than the full power state, that is 'Hot-Zero Power', 'Depressurized-Cooldown', and 'Partially Drained'. Until now safety assessment has not been done much for this operating state of CANDU type reactor worldwide. For the accuracy and confidence of PSA for the CANDU outage, the safety analysis is necessary. At the first stage, we analyzed the thermal hydraulic characteristics and safety of the postulated event of loss of shutdown cooling system (SDCS) during the partially drained state which is the longest one in the middle of outage period. As an analysis tool, this study uses the best estimate thermal hydraulic code, RELAP5/CANDU which was modified according to the CANDU specific characteristics and based on RELAP5.Mod3.

  6. Outage Performance of Flexible OFDM Schemes in Packet-Switched Transmissions

    Directory of Open Access Journals (Sweden)

    Romain Couillet

    2009-01-01

    Full Text Available α-OFDM, a generalization of the OFDM modulation, is proposed. This new modulation enhances the outage capacity performance of bursty communications. The α-OFDM scheme is easily implementable as it only requires an additional time symbol rotation after the IDFT stage and a subsequent phase rotation of the cyclic prefix. The physical effect of the induced rotation is to slide the DFT window over the frequency spectrum. When successively used with different angles α at the symbol rate, α-OFDM provides frequency diversity in block fading channels. Interestingly, simulation results show a substantial gain in terms of outage capacity and outage BER in comparison with classical OFDM modulation schemes. The framework is extended to multiantenna and multicellular OFDM-based standards. Practical simulations, in the context of 3GPP-LTE, called hereafter α-LTE, sustain our theoretical claims.

  7. Power plant and utility performance: how world-record outages are being achieved in the USA

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Two record-breaking refuelling outages at power reactors in the USA are described. The first, at Browns Ferry 3 BWR, was accomplished in 19 days 39 minutes - a shorter time than for an General Electric BWR anywhere in the world hitherto. The management attribute this success to planning, personnel and performance. As well as refuelling, inspections and maintenance, major modifications were carried out. These included the completion of the installation of digital feedwater reactor level control and digital feedwater heater level control. The second outage, at South Texas Project 2 BWR, at 17 days 14 hours and 10 minutes was the fastest yet recorded for any US nuclear unit. This achievement is ascribed to excellent outage preparation and scheduling, the superior condition of the plant equipment and teamwork and safety consciousness on behalf of the plant personnel. Finally, brief consideration is given to the nuclear performance recovery programme of Commonwealth Edison and Ontario Hydro Nuclear. (UK)

  8. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  9. Outage performance of reactive cooperation in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha

    2010-06-01

    In this paper, we investigate the outage performance of Decode-and-Forward with reactive relaying in dual-hop cooperetive Nakagaml-m fading links. The destination, based on the umque knowledge of local second hop channel state information, selects the best relay to increase the chances of cooperation when the direct link is also available. After deriving the exact distribution of the variables of interest, the outage probability of the system - with and without the direct link - is obtained in closed-form, and the ε-outage capacity is derived in the particular c.se wh.ere the channel model is reduced to a Rayleigh fading. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters.

  10. Outage performance of Decode-and-Forward partial selection in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha

    2010-01-01

    In this paper, we investigate the outage performance of Decode-and-Forward with partial selection relaying in dualhop cooperative Nakagami-m fading links. The source, based on the unique knowledge of local first hop channel state information, selects the best relay to increase the chances of successful decoding and hence the possibility of cooperation when the direct link is also available. After deriving the exact distribution of the sum of two gamma variates with the same shape parameter, the outage probability of the system-with and without the direct link-is obtained in closed-form. We also derive the ε-outage capacity in different particular cases, and the obtained results- when the channel model is reduced to a Rayleigh fading-are either new or correspond to those previously obtained in other works. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters. © 2009 IEEE.

  11. Cost of Lightning Strike Related Outages of Visual Navigational Aids at Airports in the United States

    Science.gov (United States)

    Rakas, J.; Nikolic, M.; Bauranov, A.

    2017-12-01

    Lightning storms are a serious hazard that can cause damage to vital human infrastructure. In aviation, lightning strikes cause outages to air traffic control equipment and facilities that result in major disruptions in the network, causing delays and financial costs measured in the millions of dollars. Failure of critical systems, such as Visual Navigational Aids (Visual NAVAIDS), are particularly dangerous since NAVAIDS are an essential part of landing procedures. Precision instrument approach, an operation utilized during the poor visibility conditions, utilizes several of these systems, and their failure leads to holding patterns and ultimately diversions to other airports. These disruptions lead to both ground and airborne delay. Accurate prediction of these outages and their costs is a key prerequisite for successful investment planning. The air traffic management and control sector need accurate information to successfully plan maintenance and develop a more robust system under the threat of increasing lightning rates. To analyze the issue, we couple the Remote Monitoring and Logging System (RMLS) database and the Aviation System Performance Metrics (ASPM) databases to identify lightning-induced outages, and connect them with weather conditions, demand and landing runway to calculate the total delays induced by the outages, as well as the number of cancellations and diversions. The costs are then determined by calculating direct costs to aircraft operators and costs of passengers' time for delays, cancellations and diversions. The results indicate that 1) not all NAVAIDS are created equal, and 2) outside conditions matter. The cost of an outage depends on the importance of the failed system and the conditions that prevailed before, during and after the failure. The outage that occurs during high demand and poor weather conditions is more likely to result in more delays and higher costs.

  12. Environmental determinants of unscheduled residential outages in the electrical power distribution of Phoenix, Arizona

    International Nuclear Information System (INIS)

    Maliszewski, Paul J.; Larson, Elisabeth K.; Perrings, Charles

    2012-01-01

    The sustainability of power infrastructures depends on their reliability. One test of the reliability of an infrastructure is its ability to function reliably in extreme environmental conditions. Effective planning for reliable electrical systems requires knowledge of unscheduled outage sources, including environmental and social factors. Despite many studies on the vulnerability of infrastructure systems, the effect of interacting environmental and infrastructural conditions on the reliability of urban residential power distribution remains an understudied problem. We model electric interruptions using outage data between the years of 2002 and 2005 across Phoenix, Arizona. Consistent with perceptions of increased exposure, overhead power lines positively correlate with unscheduled outages indicating underground cables are more resistant to failure. In the presence of overhead lines, the interaction between birds and vegetation as well as proximity to nearest desert areas and lakes are positive driving factors explaining much of the variation in unscheduled outages. Closeness to the nearest arterial road and the interaction between housing square footage and temperature are also significantly positive. A spatial error model was found to provide the best fit to the data. Resultant findings are useful for understanding and improving electrical infrastructure reliability. - Highlights: ► Unscheduled outages were related to interacting environmental and infrastructural conditions. ► Underground feeders are more resistant to failure. ► In the presence of overhead lines, birds, vegetation, and proximity to desert areas are positive driving factors. ► Proximity to arterial roads and a proxy for energy demand were significantly positive. ► Outages were most spatially dependent up to around 350 m.

  13. Control Room Tasks During Refueling in Ringhals 1 Nuclear Power Plant - Operator performance during refuelling outages

    International Nuclear Information System (INIS)

    Stroebeck, Einar; Olausson, Jesper; Van Gemst, Paul

    1998-01-01

    This paper discusses the performance and tasks of the operators in the control room during refuelling outages. Analyses of such events have, during the last years, shown that the risk for nuclear accidents is not negligible compared with the risk at higher reactor power levels. Some experts have the opinion that, due to mistakes during an outage, the risk for such accidents during the outage and other accidents later on during power operation is higher than in other plant situations. The high risk level is mainly a result of errors at maintenance actions and supervision of lining up of safety systems. Most of the control rooms in existing NPPs were designed more than 10 years ago. At that time the activities and the tasks for the operators were not very well understood. Procedures for refuelling and other activities during the outages were not described very well. Often the utility organisation for refuelling outages was not established at the start of the control room design. Experience from operation during many years has shown that the performance of operators can be improved in existing plant, and thus risks be reduced, by upgrading the control room. These issues have been studied as a part of the modernisation project for Ringhals 1, an ABB Atom BWR owned by Vattenfall AB in Sweden. The paper will describe the working model for upgrading the control room and important issues to take care of with respect to refuelling outages. The identified issues will be used as the input for improving control room philosophy and the individual technical systems. (authors)

  14. Investigation on cause of outage of Wide Range Monitor (WRM) in High Temperature engineering Test Reactor (HTTR). Transport operation toward investigation for cause of outage

    International Nuclear Information System (INIS)

    Shinohara, Masanori; Sawahata, Hiroaki; Kawamoto, Taiki; Saito, Kenji; Takada, Shoji; Yoshida, Naoaki; Isozaki, Ryosuke; Katsuyama, Kozo; Motegi, Toshihiro

    2012-08-01

    An event, in which one of WRMs were disabled to detect the neutron flux in the reactor core, occurred during the period of reactor shut down of HTTR in March, 2010. The actual life time of WRM was unexpectedly shorter than the past developed life time. Investigation of the cause of the outage of WRM toward the recovery of the life time up to the developed life is one of the issues to develop the technology basis of High Temperature Gas cooled Reactor (HTGR). Then, a post irradiation examination was planned to specify the damaged part causing the event in the WRM was also planned. For the investigation, the X-ray computed tomography scanner in Fuels Monitoring Facility (FMF). This report describes the preliminary investigation on the cause of outage of the WRM. The results of study for transportation method of the irradiated WRM from HTTR to FMF is also reported with the record to complete the transport operation. (author)

  15. Integrated head area design of KNGR to reduce refueling outage duration

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo Tae; Park, Chi Yong; Kim, In Hwan; Kim, Dae Woong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    In the design of KNGR (Korea Next Generation Reactor), we believe that economy is one of the most important factors to be considered. Thus, we reviewed and evaluated the consequences of designing the head area into an integrated package from an economical point of view. The refueling outage durations of the nuclear power plants currently in operation in Korea, some having and others not having integrated head package, are compared. This paper discusses the characteristics of head area design and the critical design issues of KNGR head area to evaluate the effect of the head area characteristics on the outage duration. 8 refs., 4 figs. (Author)

  16. Integrated head area design of KNGR to reduce refueling outage duration

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo Tae; Park, Chi Yong; Kim, In Hwan; Kim, Dae Woong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    In the design of KNGR (Korea Next Generation Reactor), we believe that economy is one of the most important factors to be considered. Thus, we reviewed and evaluated the consequences of designing the head area into an integrated package from an economical point of view. The refueling outage durations of the nuclear power plants currently in operation in Korea, some having and others not having integrated head package, are compared. This paper discusses the characteristics of head area design and the critical design issues of KNGR head area to evaluate the effect of the head area characteristics on the outage duration. 8 refs., 4 figs. (Author)

  17. Power Allocation and Outage Probability Analysis for SDN-based Radio Access Networks

    Science.gov (United States)

    Zhao, Yongxu; Chen, Yueyun; Mai, Zhiyuan

    2018-01-01

    In this paper, performance of Access network Architecture based SDN (Software Defined Network) is analyzed with respect to the power allocation issue. A power allocation scheme PSO-PA (Particle Swarm Optimization-power allocation) algorithm is proposed, the proposed scheme is subjected to constant total power with the objective of minimizing system outage probability. The entire access network resource configuration is controlled by the SDN controller, then it sends the optimized power distribution factor to the base station source node (SN) and the relay node (RN). Simulation results show that the proposed scheme reduces the system outage probability at a low complexity.

  18. Outage probability analysis of wireless sensor networks in the presence of channel fading and spatial correlation

    KAUST Repository

    Al-Murad, Tamim M.

    2011-07-01

    Evaluating the reliability of wireless sensor networks is becoming more important as theses networks are being used in crucial applications. The outage probability defined as the probability that the error in the system exceeds a maximum acceptable threshold has recently been used as a measure of the reliability of such systems. In this work we find the outage probability of wireless sensor network in different scenarios of distributed sensing where sensors\\' readings are affected by spatial correlation and in the presence of channel fading. © 2011 IEEE.

  19. Replacement power costs due to nuclear-plant outages: a higher standard of care

    International Nuclear Information System (INIS)

    Gransee, M.F.

    1982-01-01

    This article examines recent state public utility commission cases that deal with the high costs of replacement power that utilities must purchase after a nuclear power plant outage. Although most commissions have approved such expenses, it may be that there is a trend toward splitting the costs of such expenses between ratepayer and stockholder. Commissions are demanding a management prudence test to determine the cause of the outage and whether it meets the reasonable man standard before allowing these costs to be passed along to ratepayers. Unless the standard is applied with flexibility, however, utility companies could invoke the defenses covering traditional common law negligence

  20. Pump characteristics and applications

    CERN Document Server

    Volk, Michael

    2013-01-01

    Providing a wealth of information on pumps and pump systems, Pump Characteristics and Applications, Third Edition details how pump equipment is selected, sized, operated, maintained, and repaired. The book identifies the key components of pumps and pump accessories, introduces the basics of pump and system hydraulics as well as more advanced hydraulic topics, and details various pump types, as well as special materials on seals, motors, variable frequency drives, and other pump-related subjects. It uses example problems throughout the text, reinforcing the practical application of the formulae

  1. Effects of heat and mass transfer on peristaltic flow of a Bingham fluid in the presence of inclined magnetic field and channel with different wave forms

    International Nuclear Information System (INIS)

    Akram, Safia; Nadeem, S.; Hussain, Anwar

    2014-01-01

    In the present analysis we discussed the influence of heat and mass transfer on the peristaltic flow of a Bingham in an inclined magnetic field and channel with different wave forms. The governing two dimensional equations of momentum, heat and mass transfer are simplified under the assumptions of long wavelength and low Reynolds number approximation. The exact solutions of momentum, heat and mass transfer are calculated. Finally, graphical behaviors of various physical parameters are also discussed through the graphical behavior of pressure rise, pressure gradient, temperature concentration and stream functions. - Highlights: • Combine effects of heat and mass transfer on peristaltic flow problem is discussed. • Effects of inclined magnetic field and channel on new fluid model are discussed. • Effects of different wave forms are also discussed in the present flow problem

  2. Reactor coolant pump seal leakage monitoring

    International Nuclear Information System (INIS)

    Stevens, D.M.; Spencer, J.W.; Morris, D.J.; James, W.; Shugars, H.G.

    1986-01-01

    Problems with reactor coolant pump seals have historically accounted for a large percentage of unscheduled outages. Studies performed for the Electric Power Research Institute (EPRI) have shown that the replacement of coolant pump seals has been one of the leading causes of nuclear plant unavailability over the last ten years. Failures of coolant pump seals can lead to primary coolant leakage rates of 200-500 gallons per minute into the reactor building. Airborne activity and high surface contamination levels following these failures require a major cleanup effort and increases the time and personnel exposure required to refurbish the pump seals. One of the problems in assessing seal integrity is the inability to accurately measure seal leakage. Because seal leakage flow is normally very small, it cannot be sensed directly with normal flow instrumentation, but must be inferred from several other temperature and flow measurements. In operating plants the leakage rate has been quantified with a tipping-bucket gauge, a device which indicates when one quart of water has been accumulated. The tipping-bucket gauge has been used for most rainfall-intensity monitoring. The need for a more accurate and less expensive gauge has been addressed. They have developed a drop-counter precipitation sensor has been developed and optimized. The applicability of the drop-counter device to the problem of measuring seal leakage is being investigated. If a review of system specification and known drop-counter performance indicates that this method is feasible for measuring seal leak rates, a drop-counter gauge will be fabricated and tested in the laboratory. If laboratory tests are successful the gauge will be demonstrated in a pump test loop at Ontario Hydro and evaluated under simulated plant conditions. 3 references, 2 figures

  3. 10 CFR 501.191 - Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Use of natural gas or petroleum for certain unanticipated... Natural Gas or Petroleum for Emergency and Unanticipated Equipment Outage Purposes § 501.191 Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies defined in section...

  4. Non-dimensional characterization of the friction stir/spot welding process using a simple Couette flow model part I: Constant property Bingham plastic solution

    International Nuclear Information System (INIS)

    Buck, Gregory A.; Langerman, Michael

    2004-01-01

    A simplified model for the material flow created during a friction stir/spot welding process has been developed using a boundary driven cylindrical Couette flow model with a specified heat flux at the inner cylinder for a Bingham plastic material. Non-dimensionalization of the constant property governing equations identified three parameters that influence the velocity and temperature fields. Analytic solutions to these equations are presented and some representative results from a parametric study (parameters chosen and varied over ranges expected for the welding of a wide variety of metals) are discussed. The results also provide an expression for the critical radius (location of vanishing material velocity) as functions of the relevant non-dimensional parameters. A final study was conducted in which values for the non-dimensional heat flux parameter were chosen to produce peak dimensional temperatures on the order of 80% of the melting temperature for a typical 2000 series aluminum. Under these conditions it was discovered that the ratio of the maximum rate of shear work within the material (viscous dissipation) to the rate of energy input at the boundary due to frictional heating, ranged from about 0.0005% for the lowest pin tool rotation rate, to about 1.3% for the highest tool rotation rate studied. Curve fits to previous Gleeble data taken for a number of aluminum alloys provide reasonable justification for the Bingham plastic constitutive model, and although these fits indicate a strong temperature dependence for critical flow stress and viscosity, this work provides a simple tool for more sophisticated model validation. Part II of this study will present numerical solutions for velocity and temperature fields resulting from the non-linear coupling of the momentum and energy equations created by temperature dependent transport properties

  5. Internal pump

    International Nuclear Information System (INIS)

    Kushima, Jun; Hayashi, Youjiro; Ueda, Masayuki.

    1997-01-01

    The present invention relates to an internal pump. A water hole allowing communication between internal and external circumferences of a stretch tube is provided at the portion of the stretch tube corresponding to a position where an end face of a nozzle portion of a motor case and an end face of a diffuser are joined with each other so that hot filtered water inside a pressure container which has entered from where the end face of the nozzle portion of the motor case and the end face of the diffuser are joined with each other is combined with the purged water so that it can be sent back to the pressure container again. (author) figs

  6. Operational Readiness Verification, Phase 3. A Field Study at a Swedish NPP during a Productive Outage (Safety-train Outage)

    International Nuclear Information System (INIS)

    Hollnagel, Erik; Gauthereau, Vincent; Persson, Bodil

    2004-01-01

    This report describes the results from Phase III of a study on Operational Readiness Verification (ORV) that was carried out from December 2002 to November 2003. The work comprised a field study of ORV activities at a Swedish NPP during a planned productive outage [subavstaellning], which allowed empirical work to be conducted in an appropriate environment with good accessibility to technical staff. One conclusion from Phase I of this project was the need to look more closely at the differences between three levels or types of tests that occur in ORV: object (component) test, system level test and (safety) function test, and to analyse the different steps of testing in order to understand the nontrivial relations between tests and safety. A second conclusion was the need to take a closer look at the organisation's ability to improvise in the sense of adjusting pre-defined plans to the actual conditions under which they are to be carried out. Phase II of the project found that although all three types of test occurred, they were rather used according to need rather than to a predefined arrangement or procedure. The complexity of ORV could be understood and described by using the concepts of Community of Practice, embedding, and Efficiency-Thoroughness Trade-Off. In addition, organisation and the different communities of practice improvise by adjusting pre-defined plans or work orders to the existing conditions. Such improvisations take place both on the levels of individual actions, on the level of communities of practice, and on the organisational level. The ability to improvise is practically a necessity for work to be carried out, but is also a potential risk. Phase III of the project studied how tasks are adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. It also looked further at the different Communities of Practice that are part of maintenance and ORV, focusing on the coordination and

  7. Operational Readiness Verification, Phase 3. A Field Study at a Swedish NPP during a Productive Outage (Safety-train Outage)

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, Erik [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, Vincent; Persson, Bodil [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2004-01-01

    This report describes the results from Phase III of a study on Operational Readiness Verification (ORV) that was carried out from December 2002 to November 2003. The work comprised a field study of ORV activities at a Swedish NPP during a planned productive outage, which allowed empirical work to be conducted in an appropriate environment with good accessibility to technical staff. One conclusion from Phase I of this project was the need to look more closely at the differences between three levels or types of tests that occur in ORV: object (component) test, system level test and (safety) function test, and to analyse the different steps of testing in order to understand the nontrivial relations between tests and safety. A second conclusion was the need to take a closer look at the organisation's ability to improvise in the sense of adjusting pre-defined plans to the actual conditions under which they are to be carried out. Phase II of the project found that although all three types of test occurred, they were rather used according to need rather than to a predefined arrangement or procedure. The complexity of ORV could be understood and described by using the concepts of Community of Practice, embedding, and Efficiency-Thoroughness Trade-Off. In addition, organisation and the different communities of practice improvise by adjusting pre-defined plans or work orders to the existing conditions. Such improvisations take place both on the levels of individual actions, on the level of communities of practice, and on the organisational level. The ability to improvise is practically a necessity for work to be carried out, but is also a potential risk. Phase III of the project studied how tasks are adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. It also looked further at the different Communities of Practice that are part of maintenance and ORV, focusing on the coordination and communication between

  8. Breastfeeding FAQs: Pumping

    Science.gov (United States)

    ... of pump is best? You can buy or rent a breast pump from lactation consultants, hospitals, retail ... place to do it. Many companies offer their employees pumping and nursing areas. If yours doesn't, ...

  9. Proceedings of a joint OECD/NEA-IAEA symposium on human factors and organisation in NPP maintenance outages: impact on safety

    International Nuclear Information System (INIS)

    1995-01-01

    The sessions of this conference dealt with outage strategy and methods (in Sweden, France and United States), the organisation and management of outages (organisation during refuelling shutdowns in France, safety approaches in France, in the USA, in Canada, in the United Kingdom and in Sweden), case studies and lessons learned (in France, Korea, Sweden, UK, USA), regulatory aspects of outages (UK, Germany, Mexico, France), the development of outage techniques

  10. Impact of Co-Channel Interference on the Outage Performance Under Multiple Type II Relay Environments

    KAUST Repository

    Choi, Seyeong; Alouini, Mohamed-Slim; Nam, Sung Sik

    2017-01-01

    In this paper, through an exact analysis of the outage probability, we investigate the impact of co-channel interference (CCI) on the outage performance of type II (or user equipment) relay under multiple-relay environments considering the selection combining-based relay selection scheme with the decode-and-forward protocol. We consider the signal to interference plus noise ratio (SINR) over both independent and identically distributed and independent but non-identically distributed fading channels. To fully take into account the effect of CCI, we adopt a more practical parameter such as the CCI coefficient. The major difficulty in the analysis resides in the determination of the statistics of the output SINR. To settle this problem, we first present the general but relatively simplified expressions for the statistics and then the related outage probability in closed-form. Furthermore, to consider more practical scenario, based on the fact that the number of participating relays can be random, we investigate the average outage probability by averaging the number of participating relays.

  11. On the Outage Performance of Full-Duplex Selective Decode-and-Forward Relaying

    KAUST Repository

    Khafagy, Mohammad Galal; Ismail, Amr; Alouini, Mohamed-Slim; Aissa, Sonia

    2013-01-01

    expression for the end-to-end outage probability that captures their joint effect. With the derived expression in hand, we propose a relay transmit power optimization scheme that only requires the relay knowledge of channel statistics. Finally, we corroborate our analysis with simulations.

  12. 77 FR 63757 - Extension of the Commission's Rules Regarding Outage Reporting to Interconnected Voice Over...

    Science.gov (United States)

    2012-10-17

    ... telephone subscriptions in the United States were users of interconnected VoIP providers--an increase of 21... Commission's Rules Regarding Outage Reporting to Interconnected Voice Over Internet Protocol Service Providers and Broadband Internet Service Providers AGENCY: Federal Communications Commission. ACTION: Final...

  13. Outage Analysis and Optimization of SWIPT in Network-Coded Two-Way Relay Networks

    Directory of Open Access Journals (Sweden)

    Ruihong Jiang

    2017-01-01

    Full Text Available This paper investigates the outage performance of simultaneous wireless information and power transfer (SWIPT in network-coded two-way relay systems, where a relay first harvests energy from the signals transmitted by two sources and then uses the harvested energy to forward the received information to the two sources. We consider two transmission protocols, power splitting two-way relay (PS-TWR and time switching two-way relay (TS-TWR protocols. We present two explicit expressions for the system outage probability of the two protocols and further derive approximate expressions for them in high and low SNR cases. To explore the system performance limits, two optimization problems are formulated to minimize the system outage probability. Since the problems are nonconvex and have no known solution methods, a genetic algorithm- (GA- based algorithm is designed. Numerical and simulation results validate our theoretical analysis. It is shown that, by jointly optimizing the time assignment and SWIPT receiver parameters, a great performance gain can be achieved for both PS-TWR and TS-TWR. Moreover, the optimized PS-TWR always outperforms the optimized TS-TWR in terms of outage performance. Additionally, the effects of parameters including relay location and transmit powers are also discussed, which provide some insights for the SWIPT-enabled two-way relay networks.

  14. A Study on the Frequency of Initiating Event of OPR-1000 during Outage Periods

    Energy Technology Data Exchange (ETDEWEB)

    Hong Jae Beol; Jae, Moo Sung [Hanyang Univ., Seoul (Korea, Republic of)

    2013-10-15

    These sources of data did not reflect the latest event data which have occurred during the PWR outage to the frequencies of initiating event Electric Power Research Institute(EPRI) in USA collected the data of loss of decay heat removal during outage from 1989 to 2009 and published technical report. Domestic operating experiences for LOOP is gathered in Operational Performance Information System for Nuclear Power Plant(OPIS). To reduce conservatism and obtain completeness for LPSD PSA, those data should be collected and used to update the frequencies. The frequencies of LOSDC and LOOP are reevaluated using the data of EPRI and OPIS in this paper. Quantification is conducted to recalculate core damage frequency(CDF), since the rate is changed. The results are discussed below. To make an accurate estimate of the initiating events of LPSD PSA, the event data were collected and the frequencies of initiating events were updated using Bayesian approach. CDF was evaluated through quantification. Δ CDF is -40% and the dominant contributor is pressurizer PSV stuck open event. The most of the event data in EPRI TR were collected from US nuclear power plant industry. Those data are not enough to evaluate outage risk precisely. Therefore, to reduce conservatism and obtain completeness for LPSD PSA, the licensee event report and domestic data should be collected and reflected to the frequencies of the initiating events during outage.

  15. Economic and Environmental Impacts of the Columbia-Snake River Extended Lock Outage

    Science.gov (United States)

    2012-03-01

    This reports main objective is to analyze the change in rates and modal costs for shippers, commodity industries and ports prior to, during and after the fifteen week lock outage and to determine the impacts on the environment in the form of energ...

  16. On the outage capacity of the block fading channel at low-power regime

    KAUST Repository

    Rezki, Zouheir; Alouini, Mohamed-Slim

    2014-01-01

    the transmitter and the receiver (CSI-TR), under a short-term power constraint. We show that selection diversity that allocates all the power to the strongest block is asymptotically optimal. Then, we provide a simple characterization of the outage probability

  17. Outage and BER analysis for ultrawideband-based WPAN in Nakagami-m fading channels

    KAUST Repository

    Mehbodniya, Abolfazl; Aissa, Sonia

    2011-01-01

    layer. Approximate expressions for the outage probability and average bit error rate (BER) are derived in closed form for the MB-OFDM target receiver, taking into account multi-user interference (MUI), as well as external interference in the form of time

  18. Health and maintenance outages in nuclear power plants: an epidemiological survey

    International Nuclear Information System (INIS)

    Telle, M.A.; Huez, D.; Niedbala, J.M.; Auclair, J.; Canales, J.P.; Duverge, C.; Forest, H.; Gerondal, M.; Paris, P.M.; Renault, J.C.; Bossevain, L.; Blaise, P.; Blanc, M.C.; Goldberg, M.; Charpak, Y.

    1995-01-01

    An epidemiological survey, started in 1989, was carried out at the nuclear power plants in the Loire river valley and at Le Blayais (France). Working conditions, work organisation and their impact on health during annual maintenance outages were studied. The main areas covered in this cross-sectional study were: anxiety and symptoms of depression using the Spielberger and CES-D scales. Comparisons were made during both a scheduled outage and in normal operation on four distinct groups of workers, each individual being his own control. A chi-square test was used for the quantitative variables and a test on differences for the quantitative variables. During a unit outage, more frequent overtime and atypical working hours were reported (p<0.01); working rhythms and safety rules were felt as more restrictive and exposure to radiation higher (p<0.01). Detrimental modifications of anxiety and symptoms of depression were observed on controllers whereas expected on maintenance agents. Similar results were observed when considering the rates of outages. Possible readings are given with reference to qualitative studies carried out on this topic, which implies extending our research with both the quantitative and qualitative approaches. (authors). 10 refs., 6 tabs

  19. Impact of Co-Channel Interference on the Outage Performance Under Multiple Type II Relay Environments

    KAUST Repository

    Choi, Seyeong

    2017-11-15

    In this paper, through an exact analysis of the outage probability, we investigate the impact of co-channel interference (CCI) on the outage performance of type II (or user equipment) relay under multiple-relay environments considering the selection combining-based relay selection scheme with the decode-and-forward protocol. We consider the signal to interference plus noise ratio (SINR) over both independent and identically distributed and independent but non-identically distributed fading channels. To fully take into account the effect of CCI, we adopt a more practical parameter such as the CCI coefficient. The major difficulty in the analysis resides in the determination of the statistics of the output SINR. To settle this problem, we first present the general but relatively simplified expressions for the statistics and then the related outage probability in closed-form. Furthermore, to consider more practical scenario, based on the fact that the number of participating relays can be random, we investigate the average outage probability by averaging the number of participating relays.

  20. 76 FR 36892 - Proposed Extension of Part 4 of the Commission's Rules Regarding Outage Reporting to...

    Science.gov (United States)

    2011-06-23

    ...: None. Title: Communications Outage Reporting for Interconnected Voice over Internet Protocol Service.... Type of Review: New collection. Respondents: Businesses (Interconnected Voice over Internet Protocol... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 4 [PS Docket No. 11-82; FCC 11-74] Proposed...

  1. Outage performance of reactive cooperation in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha; Alouini, Mohamed-Slim

    2010-01-01

    In this paper, we investigate the outage performance of Decode-and-Forward with reactive relaying in dual-hop cooperetive Nakagaml-m fading links. The destination, based on the umque knowledge of local second hop channel state information, selects

  2. Consequences of long-term power outages and high electricity prices lasting for months

    International Nuclear Information System (INIS)

    2005-01-01

    Several areas in the world have experienced electricity outages for longer periods of time, but the consequences of these are sparsely documented. There is a need for further analysis of the socioeconomic consequences of the outages. In addition to KILE (Quality adjusted revenue framework for un supplied energy) costs one has to take into account that the costs often increase proportionally with the durance of the outage, and that KILE tariffs do not reflect lost consumer's surplus for products that are not produced during an outage. A good example is the public underground transport, where the company's economical loss can be significantly smaller than the loss of utility value for the travellers. If the authorities act with reasonability it is difficult to see that periods with very high prices represent a big problem. The most important problems are related to diffused effects, especially for households with a weak economy. These problems can be solved with improved contractual forms (price guarantees) or by transfers to the households, without weakening the incentives for electricity economising (ml)

  3. LMFBR with booster pump in pumping loop

    International Nuclear Information System (INIS)

    Rubinstein, H.J.

    1975-01-01

    A loop coolant circulation system is described for a liquid metal fast breeder reactor (LMFBR) utilizing a low head, high specific speed booster pump in the hot leg of the coolant loop with the main pump located in the cold leg of the loop, thereby providing the advantages of operating the main pump in the hot leg with the reliability of cold leg pump operation

  4. Optimization of Allowed Outage Time and Surveillance Test Intervals

    Energy Technology Data Exchange (ETDEWEB)

    Al-Dheeb, Mujahed; Kang, Sunkoo; Kim, Jonghyun [KEPCO international nuclear graduate school, Ulsan (Korea, Republic of)

    2015-10-15

    The primary purpose of surveillance testing is to assure that the components of standby safety systems will be operable when they are needed in an accident. By testing these components, failures can be detected that may have occurred since the last test or the time when the equipment was last known to be operational. The probability a system or system component performs a specified function or mission under given conditions at a prescribed time is called availability (A). Unavailability (U) as a risk measure is just the complementary probability to A(t). The increase of U means the risk is increased as well. D and T have an important impact on components, or systems, unavailability. The extension of D impacts the maintenance duration distributions for at-power operations, making them longer. This, in turn, increases the unavailability due to maintenance in the systems analysis. As for T, overly-frequent surveillances can result in high system unavailability. This is because the system may be taken out of service often due to the surveillance itself and due to the repair of test-caused failures of the component. The test-caused failures include those incurred by wear and tear of the component due to the surveillances. On the other hand, as the surveillance interval increases, the component's unavailability will grow because of increased occurrences of time-dependent random failures. In that situation, the component cannot be relied upon, and accordingly the system unavailability will increase. Thus, there should be an optimal component surveillance interval in terms of the corresponding system availability. This paper aims at finding the optimal T and D which result in minimum unavailability which in turn reduces the risk. Applying the methodology in section 2 to find the values of optimal T and D for two components, i.e., safety injection pump (SIP) and turbine driven aux feedwater pump (TDAFP). Section 4 is addressing interaction between D and T. In general

  5. Optimization of Allowed Outage Time and Surveillance Test Intervals

    International Nuclear Information System (INIS)

    Al-Dheeb, Mujahed; Kang, Sunkoo; Kim, Jonghyun

    2015-01-01

    The primary purpose of surveillance testing is to assure that the components of standby safety systems will be operable when they are needed in an accident. By testing these components, failures can be detected that may have occurred since the last test or the time when the equipment was last known to be operational. The probability a system or system component performs a specified function or mission under given conditions at a prescribed time is called availability (A). Unavailability (U) as a risk measure is just the complementary probability to A(t). The increase of U means the risk is increased as well. D and T have an important impact on components, or systems, unavailability. The extension of D impacts the maintenance duration distributions for at-power operations, making them longer. This, in turn, increases the unavailability due to maintenance in the systems analysis. As for T, overly-frequent surveillances can result in high system unavailability. This is because the system may be taken out of service often due to the surveillance itself and due to the repair of test-caused failures of the component. The test-caused failures include those incurred by wear and tear of the component due to the surveillances. On the other hand, as the surveillance interval increases, the component's unavailability will grow because of increased occurrences of time-dependent random failures. In that situation, the component cannot be relied upon, and accordingly the system unavailability will increase. Thus, there should be an optimal component surveillance interval in terms of the corresponding system availability. This paper aims at finding the optimal T and D which result in minimum unavailability which in turn reduces the risk. Applying the methodology in section 2 to find the values of optimal T and D for two components, i.e., safety injection pump (SIP) and turbine driven aux feedwater pump (TDAFP). Section 4 is addressing interaction between D and T. In general

  6. Liquid metal pump

    Science.gov (United States)

    Pennell, William E.

    1982-01-01

    The liquid metal pump comprises floating seal rings and attachment of the pump diffuser to the pump bowl for isolating structural deflections from the pump shaft bearings. The seal rings also eliminate precision machining on large assemblies by eliminating the need for a close tolerance fit between the mounting surfaces of the pump and the seals. The liquid metal pump also comprises a shaft support structure that is isolated from the pump housing for better preservation of alignment of shaft bearings. The shaft support structure also allows for complete removal of pump internals for inspection and repair.

  7. Liquid metal pump

    International Nuclear Information System (INIS)

    Pennell, W.E.

    1982-01-01

    The liquid metal pump comprises floating seal rings and attachment of the pump diffuser to the pump bowl for isolating structural deflections from the pump shaft bearings. The seal rings also eliminate precision machining on large assemblies by eliminating the need for a close tolerance fit between the mounting surfaces of the pump and the seals. The liquid metal pump also comprises a shaft support structure that is isolated from the pump housing for better preservation of alignment of shaft bearings. The shaft support structure also allows for complete removal of pump internals for inspection and repair

  8. Heat pump technology

    CERN Document Server

    Von Cube, Hans Ludwig; Goodall, E G A

    2013-01-01

    Heat Pump Technology discusses the history, underlying concepts, usage, and advancements in the use of heat pumps. The book covers topics such as the applications and types of heat pumps; thermodynamic principles involved in heat pumps such as internal energy, enthalpy, and exergy; and natural heat sources and energy storage. Also discussed are topics such as the importance of the heat pump in the energy industry; heat pump designs and systems; the development of heat pumps over time; and examples of practical everyday uses of heat pumps. The text is recommended for those who would like to kno

  9. Implementation of an RHR/LPSI pump coupling retrofit program

    International Nuclear Information System (INIS)

    Dudiak, J.G.; Koch, R.P.; Orewyler, R.; Tipton, J.W.

    1994-01-01

    Nuclear plant operating experience has shown the RHR and LPSI services to be very demanding on pumps. The systems handle borated water at high temperatures and pressures with frequent step changes in both temperature and pressure. Additionally, the industry trend towards reduced flow rates during plant mid-loop (reduced inventory) conditions has resulted in extended pump operation at flow rates significantly below the pump best efficiency point flow. Operation at these low flow fates is known to cause high thrust loads and large shaft deflections. The combination of these and other factors have resulted in short mechanical seal life and short motor bearing life, thus requiring frequent pump and motor maintenance. For many nuclear plants, including Southern California Edison's (SCE) San Onofre Units 2 and 3, these pumps have represented a major operations and maintenance (O ampersand M) expenditure and a significant source of radiation exposure to plant personnel. SCE management determined that a pump upgrade was justified to reduce the O ampersand M costs and to improve plant availability. SCE decided to proceed with a pump retrofit program to improve the pump maintainability, reliability and availability. Installation was completed for four LPSI pumps at San Onofre Units 2 and 3 during the Cycle 7 refueling outages in 1993. A key to the program's success was the removal of many traditional supplier and customer barriers and revision of supplier and customer roles to create a unified team. This paper traces the RHR/LPSI retrofit program for San Onofre from problem identification to project implementation. The team approach used for this program and the lessons learned may be useful to other utilities and vendors when evaluating or implementing system and equipment upgrades

  10. Kozloduy NPP units 5 and 6 modernization program. Measures implementation in outages

    International Nuclear Information System (INIS)

    Naydenov, N.; Mignone, O.

    2004-01-01

    The units 5 and 6 modernization program is a highly demanding program composed by many plant modifications and studies about plant conditions. The program measures implementation during the units outages represents a challenge by the need to compromise shut down duration with the workload related to measures installation. The units shutdown duration should be kept to the planned duration. In parallel, contractors work has to be organized, planned and performed to allow successful measures completion. In accordance with the contract requirements, contractors prepare installation documents which comprise all activities to be performed during the installation and testing of the measures. The subcontractors complement these installation documents with the project organization and execution documents, which include the manpower skills, qualifications, work orders, and other important installation instructions and information. Contractors prepared detailed installation schedules, and these were integrated by Parsons E and C in the Integrated installation schedule. The integrated schedule proved to be useful to identify possible area usage conflicts and manpower overlapping, with appropriate results for electrical, instrumentation and control work, and for the utilization of the polar crane in the containment building. Contractors installation schedules were updated on a weekly basis, showing variances versus the target, and manpower histograms for the resource loading. Organization of contractors work was supported by KNPP plant outage meetings, in which status and problems were addressed, and solution and/or corrective actions defined for further implementation. KNPP meetings were planned on a daily basis for most relevant or critical measures, or on a weekly basis for less intensive measures. KNPP meetings proved to be an excellent communication tool for keeping the measures under control and monitoring KNPP defined personnel responsible for authorizing changes, in

  11. World-class outage performance of the Olkiluoto nuclear power plant

    International Nuclear Information System (INIS)

    Paavola, M.

    1998-01-01

    The production of the Olkiluoto power plant units covered 17% of the electricity consumption in Finland in 1997; the total share of nuclear energy was 27% of the electricity consumed in the country. Based on Finnish experience, nuclear energy is a safe, environmentally friendly and economic way to produce electricity provided that the plants and their personnel are well taken care of. TVO's policy is to keep the plant units in good condition and technically modern. This requires continuous investments in the plant. In maintenance, attention is paid to monitoring the condition of the plant and to preventive maintenance aiming at avoiding disturbances in production. TVO has chosen continuous development as the operational line develops the plant by annual investments and performs the necessary modifications during planned annual outages trying to avoid long production interruptions. The load factors of the Olkiluoto nuclear power plant have been high. The average load factor during the last decade was over 93%. The most significant single factor in the production deficits is the amount or electricity, which has not been produced because of the annual outages. Due to this, special attention has been paid to the performance of the annual outages. TVO aims at continuous development of the annual outage procedure. A centralized task management system makes it possible to perform simultaneously more tasks than before. The company has also invested in equipment and systems, which ease and speed up servicing. Normal outage length varies between 10 and 16 days. By keeping the plant units as modern as possible and in good condition we facilitate reaching TVO's target, which is also stated in TVO's slogan 'always 40 years lifetime'. (author)

  12. Dry vacuum pumps

    International Nuclear Information System (INIS)

    Sibuet, R

    2008-01-01

    For decades and for ultimate pressure below 1 mbar, oil-sealed Rotary Vane Pumps have been the most popular solution for a wide range of vacuum applications. In the late 80ies, Semiconductor Industry has initiated the development of the first dry roughing pumps. Today SC applications are only using dry pumps and dry pumping packages. Since that time, pumps manufacturers have developed dry vacuum pumps technologies in order to make them attractive for other applications. The trend to replace lubricated pumps by dry pumps is now spreading over many other market segments. For the Semiconductor Industry, it has been quite easy to understand the benefits of dry pumps, in terms of Cost of Ownership, process contamination and up-time. In this paper, Technology of Dry pumps, its application in R and D/industries, merits over conventional pumps and future growth scope will be discussed

  13. Solar Pumping : The Basics

    OpenAIRE

    World Bank Group

    2018-01-01

    Solar photovoltaic water pumping (SWP) uses energy from solar photovoltaic (PV) panels to power an electric water pump. The entire process, from sunlight to stored energy, is elegant and simple. Over last seven years, the technology and price of solar pumping have evolved dramatically and hence the opportunities it presents. Solar pumping is most competitive in regions with high solar inso...

  14. Multiple pump housing

    Science.gov (United States)

    Donoho, II, Michael R.; Elliott; Christopher M.

    2010-03-23

    A fluid delivery system includes a first pump having a first drive assembly, a second pump having a second drive assembly, and a pump housing. At least a portion of each of the first and second pumps are located in the housing.

  15. Centrifugal pump handbook

    CERN Document Server

    Pumps, Sulzer

    2010-01-01

    This long-awaited new edition is the complete reference for engineers and designers working on pump design and development or using centrifugal pumps in the field. This authoritative guide has been developed with access to the technical expertise of the leading centrifugal pump developer, Sulzer Pumps. In addition to providing the most comprehensive centrifugal pump theory and design reference with detailed material on cavitation, erosion, selection of materials, rotor vibration behavior and forces acting on pumps, the handbook also covers key pumping applications topics and operational

  16. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)

    2014-07-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  17. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  18. Development of a reactor-coolant-pump monitoring and diagnostic system. Semi-annual progress report, December 1981-May 1982

    International Nuclear Information System (INIS)

    Morris, D.J.; Gabler, H.C.

    1982-10-01

    Reactor coolant (RC) pump seal failures have resulted in excessive leakage of primary coolant into reactor containment buildings. In some cases, high levels of airborne activity and surface contamination following these failures have necessitated extensive cleanup efforts and personnel radiation exposure. Unpredictable pump seal performance has also caused forced outages and frequent maintenance. The quality of operating data has been insufficient to allow proper evaluation of theoretical RC pump seal failure mechanisms. The RC pump monitoring and diagnostic system being developed and installed at Toledo Edison's Davis-Besse Nuclear Power Station will examine the relationship between seal failures and three other variables. This report describes system software and hardware development, testing, and installation work performed during the period of December 1981 through May 1982. Also described herein is a parallel effort being conducted by a B and W/Byron Jackson/Utility group to improve pump seal performance

  19. Pumping mechanisms in sputter-ion pumps low pressure operation

    International Nuclear Information System (INIS)

    Welch, K.M.

    1991-01-01

    It is shown that significant H 2 pumping occurs in the walls of triode pumps. Also, H 2 is pumped in the anode cells of sputter-ion pumps. This pumping occurs in a manner similar to that by which the inert gases are pumped. That is, H 2 pumped in the walls of the anode cells by high energy neutral burial. Hydrogen in the pump walls and anodes limits the base pressure of the pump. 13 refs., 5 figs., 1 tab

  20. Pumping mechanisms in sputter-ion pumps low pressure operation

    International Nuclear Information System (INIS)

    Welch, K.M.

    1991-01-01

    It is shown that significant H 2 pumping occurs in the walls of triode pumps. Also, H 2 is pumped in the anode cells of sputter-ion pumps. This pumping occurs in a manner similar to that by which the inert gases are pumped. That is, H 2 is pumped in the walls of the anode cells by high energy neutral burial. Hydrogen in the pump walls and anodes limits the base pressure of the pump

  1. Adsorption pump for helium pumping out

    International Nuclear Information System (INIS)

    Donde, A.L.; Semenenko, Yu.E.

    1981-01-01

    Adsorption pump with adsorbent cooling by liquid helium is described. Shuttered shield protecting adsorbent against radiation is cooled with evaporating helium passing along the coil positioned on the shield. The pump is also equipped with primed cylindrical shield, cooled with liquid nitrogen. The nitrogen shield has in the lower part the shuttered shield, on the pump casing there is a valve used for pump pre-burning, and valves for connection to recipient as well. Pumping- out rates are presented at different pressures and temperatures of adsorbent. The pumping-out rate according to air at absorbent cooling with liquid nitrogen constituted 5x10 -4 Pa-3000 l/s, at 2x10 -2 Pa-630 l/s. During the absorbent cooling with liquid hydrogen the pumping-out rate according to air was at 4x10 -4 Pa-580 l/s, at 2x10 -3 Pa-680 l/s, according to hydrogen - at 8x10 -5 Pa-2500 l/s, at 5x10 -3 Pa-4200 l/s. During adsorbent cooling with liquid helium the rate of pumping-out according to hydrogen at 3x10 5 Pa-2400% l/s, at 6x10 3 Pa-1200 l/s, and according to helium at 3.5x10 -5 Pa-2800 l/s, at 4x10 -3 Pa-1150 l/s. The limit vacuum is equal to 1x10 -7 Pa. The volume of the vessel with liquid helium is equal to 3.5 l. Helium consumption is 80 cm 3 /h. Consumption of liquid nitrogen from the shield is 400 cm 3 /h. The limit pressure in the pump is obtained after forevacuum pumping-out (adsorbent regeneration) at 300 K temperature. The pump is made of copper. The pump height together with primed tubes is 800 mm diameter-380 mm [ru

  2. A RLS-SVM Aided Fusion Methodology for INS during GPS Outages.

    Science.gov (United States)

    Yao, Yiqing; Xu, Xiaosu

    2017-02-24

    In order to maintain a relatively high accuracy of navigation performance during global positioning system (GPS) outages, a novel robust least squares support vector machine (LS-SVM)-aided fusion methodology is explored to provide the pseudo-GPS position information for the inertial navigation system (INS). The relationship between the yaw, specific force, velocity, and the position increment is modeled. Rather than share the same weight in the traditional LS-SVM, the proposed algorithm allocates various weights for different data, which makes the system immune to the outliers. Field test data was collected to evaluate the proposed algorithm. The comparison results indicate that the proposed algorithm can effectively provide position corrections for standalone INS during the 300 s GPS outage, which outperforms the traditional LS-SVM method. Historical information is also involved to better represent the vehicle dynamics.

  3. On the outage capacity of the block fading channel at low-power regime

    KAUST Repository

    Rezki, Zouheir

    2014-06-01

    Outage performance of the M-block fading with additive white Gaussian noise (BF-AWGN) is investigated at low-power regime. We consider delay-constrained constant-rate communications with perfect channel state information (CSI) at both the transmitter and the receiver (CSI-TR), under a short-term power constraint. We show that selection diversity that allocates all the power to the strongest block is asymptotically optimal. Then, we provide a simple characterization of the outage probability in the regime of interest. We quantify the reward due to CSI-TR over the constant-rate constant-power scheme and show that this reward increases with the delay constraint. For instance, for Rayleigh fading, we find that a power gain up to 4.3 dB is achievable. © 2014 IEEE.

  4. On the Outage Performance of Full-Duplex Selective Decode-and-Forward Relaying

    KAUST Repository

    Khafagy, Mohammad Galal

    2013-02-25

    We evaluate the outage performance in a three-terminal full-duplex relay channel that adopts a selective decode-and-forward protocol, taking relay self-interference into account. Previous work focused on coverage extension scenarios where direct source-destination transmissions are neglected or considered as interference. In this work, we account for the relay self-interference, and exploit the cooperative diversity offered by the independently fading source/relay message replicas that arrive at the destination. We present an approximate, yet accurate, closed-form expression for the end-to-end outage probability that captures their joint effect. With the derived expression in hand, we propose a relay transmit power optimization scheme that only requires the relay knowledge of channel statistics. Finally, we corroborate our analysis with simulations.

  5. A RLS-SVM Aided Fusion Methodology for INS during GPS Outages

    Directory of Open Access Journals (Sweden)

    Yiqing Yao

    2017-02-01

    Full Text Available In order to maintain a relatively high accuracy of navigation performance during global positioning system (GPS outages, a novel robust least squares support vector machine (LS-SVM-aided fusion methodology is explored to provide the pseudo-GPS position information for the inertial navigation system (INS. The relationship between the yaw, specific force, velocity, and the position increment is modeled. Rather than share the same weight in the traditional LS-SVM, the proposed algorithm allocates various weights for different data, which makes the system immune to the outliers. Field test data was collected to evaluate the proposed algorithm. The comparison results indicate that the proposed algorithm can effectively provide position corrections for standalone INS during the 300 s GPS outage, which outperforms the traditional LS-SVM method. Historical information is also involved to better represent the vehicle dynamics.

  6. Monitoring Disaster-Related Power Outages Using NASA Black Marble Nighttime Light Product

    Science.gov (United States)

    Wang, Z.; Román, M. O.; Sun, Q.; Molthan, A. L.; Schultz, L. A.; Kalb, V. L.

    2018-04-01

    Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL) provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA) Black Marble NTL daily standard product suite (VNP46) is generated from Visible Infrared Imaging Radiometer Suite (VIIRS) Day/Night Band (DNB) onboard the NASA/National Oceanic and Atmospheric Administration (NOAA) Suomi National Polar-orbiting Partnership (Suomi- NPP) satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines), the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  7. MONITORING DISASTER-RELATED POWER OUTAGES USING NASA BLACK MARBLE NIGHTTIME LIGHT PRODUCT

    Directory of Open Access Journals (Sweden)

    Z. Wang

    2018-04-01

    Full Text Available Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA Black Marble NTL daily standard product suite (VNP46 is generated from Visible Infrared Imaging Radiometer Suite (VIIRS Day/Night Band (DNB onboard the NASA/National Oceanic and Atmospheric Administration (NOAA Suomi National Polar-orbiting Partnership (Suomi- NPP satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines, the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  8. Prediction of power system frequency response after generator outages using neural nets

    Energy Technology Data Exchange (ETDEWEB)

    Djukanovic, M B; Popovic, D P [Electrotechnicki Inst. ' Nikola Tesla' , Belgrade (Yugoslavia); Sobajic, D J; Pao, Y -H [Case Western Reserve Univ., Cleveland, OH (United States)

    1993-09-01

    A new methodology is presented for estimating the frequency behaviour of power systems necessary for an indication of under-frequency load shedding in steady-state security assessment. It is well known that large structural disturbances such as generator tripping or load outages can initiate cascading outages, system separation into islands, and even the complete breakup. The approach provides a fairly accurate method of estimating the system average frequency response without making simplifications or neglecting non-linearities and small time constants in the equations of generating units, voltage regulators and turbines. The efficiency of the new procedure is demonstrated using the New England power system model for a series of characteristic perturbations. The validity of the proposed approach is verified by comparison with the simulation of short-term dynamics including effects of control and automatic devices. (author)

  9. Outage Performance of Hybrid FSO/RF System with Low-Complexity Power Adaptation

    KAUST Repository

    Rakia, Tamer

    2016-02-26

    Hybrid free-space optical (FSO) / radio-frequency (RF) systems have emerged as a promising solution for high data- rate wireless communication systems. We consider truncated channel inversion based power adaptation strategy for coherent and non- coherent hybrid FSO/RF systems, employing an adaptive combining scheme. Specifically, we activate the RF link along with the FSO link when FSO link quality is unacceptable, and adaptively set RF transmission power to ensure constant combined signal-to-noise ratio at receiver terminal. Analytical expressions for the outage probability of the hybrid system with and without power adaptation are derived. Numerical examples show that, the hybrid FSO/RF systems with power adaptation achieve considerable outage performance improvement over conventional hybrid FSO/RF systems without power adaptation. © 2015 IEEE.

  10. Outage Probability versus Fairness Trade-off in Opportunistic Relay Selection with Outdated CSI

    Directory of Open Access Journals (Sweden)

    Vicario JoseLopez

    2009-01-01

    Full Text Available We analyze the existing trade-offs in terms of system performance versus fairness of a cooperative system based on opportunistic relay selection (ORS and with outdated channel state information (CSI. In particular, system performance is analytically evaluated in terms of outage probability, and the fairness behavior is assessed based on the power consumption at the different relays. In order to improve the fairness behavior of ORS while keeping the selection diversity gain, we propose a relay selection mechanism where the relay with the highest normalized signal-to-noise ratio (SNR is selected for relaying the source's information. The proposed strategy is compared with existing relay selection strategies by adopting a novel graphical representation inspired by expected profit versus risk plots used in modern portfolio theory. As shown in the paper, this strategy allows operating the system in more favorable points of the outage versus fairness region.

  11. Outage and Capacity Performance Evaluation of Distributed MIMO Systems over a Composite Fading Channel

    Directory of Open Access Journals (Sweden)

    Wenjie Peng

    2014-01-01

    Full Text Available The exact closed-form expressions regarding the outage probability and capacity of distributed MIMO (DMIMO systems over a composite fading channel are derived. This is achieved firstly by using a lognormal approximation to a gamma-lognormal distribution when a mobile station (MS in the cell is in a fixed position, and the so-called maximum ratio transmission/selected combining (MRT-SC and selected transmission/maximum ratio combining (ST-MRC schemes are adopted in uplink and downlink, respectively. Then, based on a newly proposed nonuniform MS cell distribution model, which is more consistent with the MS cell hotspot distribution in an actual communication environment, the average outage probability and capacity formulas are further derived. Finally, the accuracy of the approximation method and the rationality of the corresponding theoretical analysis regarding the system performance are proven and illustrated by computer simulations.

  12. Method for estimating power outages and restoration during natural and man-made events

    Science.gov (United States)

    Omitaomu, Olufemi A.; Fernandez, Steven J.

    2016-01-05

    A method of modeling electric supply and demand with a data processor in combination with a recordable medium, and for estimating spatial distribution of electric power outages and affected populations. A geographic area is divided into cells to form a matrix. Within the matrix, supply cells are identified as containing electric substations and demand cells are identified as including electricity customers. Demand cells of the matrix are associated with the supply cells as a function of the capacity of each of the supply cells and the proximity and/or electricity demand of each of the demand cells. The method includes estimating a power outage by applying disaster event prediction information to the matrix, and estimating power restoration using the supply and demand cell information of the matrix and standardized and historical restoration information.

  13. Recent Performance of and Plasma Outage Studies with the SNS H- Source

    Energy Technology Data Exchange (ETDEWEB)

    Stockli, Martin P [ORNL; Han, Baoxi [ORNL; Murray Jr, S N [ORNL; Pennisi, Terry R [ORNL; Piller, Chip [ORNL; Santana, Manuel [ORNL; Welton, Robert F [ORNL

    2016-01-01

    SNS ramps to higher power levels that can be sustained with high availability. The goal is 1.4 MW despite a compromised RFQ, which requires higher RF power than design levels to approach the nominal beam transmission. Unfortunately at higher power the RFQ often loses its thermal stability, a problem apparently enhanced by beam losses and high influxes of hydrogen. Delivering as much H- beam as possible with the least amount of hydrogen led to plasma outages. The root cause is the dense 1-ms long ~55-kW 2-MHz plasma pulses reflecting ~90% of the continuous ~300W, 13-MHz power, which was mitigated with a 4-ms filter for the reflected power signal and an outage resistant, slightly-detuned 13-MHz match. Lowering the H2 also increased the H- beam current to ~55 mA, and increased the transmission by ~7%.

  14. Continuously pumping and reactivating gas pump

    International Nuclear Information System (INIS)

    Batzer, T.H.; Call, W.R.

    1984-01-01

    Apparatus for continuous pumping using cycling cyropumping panels. A plurality of liquid helium cooled panels are surrounded by movable nitrogen cooled panels the alternatively expose or shield the helium cooled panels from the space being pumped. Gases condense on exposed helium cooled panels until the nitrogen cooled panels are positioned to isolate the helium cooled panels. The helium cooled panels are incrementally warmed, causing captured gases to accumulate at the base of the panels, where an independent pump removes the gases. After the helium cooled panels are substantially cleaned of condensate, the nitrogen cooled panels are positioned to expose the helium cooled panels to the space being pumped

  15. Continuously pumping and reactivating gas pump

    Science.gov (United States)

    Batzer, Thomas H.; Call, Wayne R.

    1984-01-01

    Apparatus for continuous pumping using cycling cyropumping panels. A plurality of liquid helium cooled panels are surrounded by movable nitrogen cooled panels the alternatively expose or shield the helium cooled panels from the space being pumped. Gases condense on exposed helium cooled panels until the nitrogen cooled panels are positioned to isolate the helium cooled panels. The helium cooled panels are incrementally warmed, causing captured gases to accumulate at the base of the panels, where an independent pump removes the gases. After the helium cooled panels are substantially cleaned of condensate, the nitrogen cooled panels are positioned to expose the helium cooled panels to the space being pumped.

  16. Exact closed form expressions for outage probability of GSC receivers over Rayleigh fading channel subject to self-interference

    KAUST Repository

    Nam, Sungsik; Hasna, Mazen Omar; Alouini, Mohamed-Slim

    2010-01-01

    in mind, we capitalize in this paper on some new order statistics results to derive exact closed-form expressions for outage probability of GSC RAKE receivers subject to self-interference over independent and identically distributed Rayleigh fading

  17. Energy markets : refinery outages can have varying gasoline price impacts, but gaps in federal data limit understanding of impacts.

    Science.gov (United States)

    2009-07-01

    In 2008, GAO reported that, with : the exception of the period : following Hurricanes Katrina and : Rita, refinery outages in the United : States did not show discernible : trends in reduced production : capacity, frequency, and location : from 2002 ...

  18. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    International Nuclear Information System (INIS)

    Gotcheva, N.; Macchi, L.; Oedewald, P.; Eitrheim, M.H.R.; Axelsson, C.; Reiman, T.; Pietikaeinen, E.

    2013-04-01

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  19. Study on European Nuclear Safety Practices during Planned Outages at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2001-12-01

    The present project was aimed at providing: a description of the current status of nuclear safety practices during planned outages at nuclear power plants followed in Europe; the criteria for the safety analysis of future reactors at the design stage; proposing a set of recommendations on good practices and criteria leading to the improvement of nuclear safety during those conditions. The work was organised in 3 phases: Collecting data on current practices; Analysis of questionnaire answers and drawing up of safety good practices references and recommendations; Collecting relevant ideas related to the future reactors at design stage (European Pressurised Water Reactor, European Passive Plant project, European Utilities Requirements and Utilities Requirement Document project). The key element of the performed work was the detailed questionnaire, based on bibliographical review, expert experience and outage practices available in the working team. Different safety areas and activities were covered: outage context; nuclear safety; outage strategy, organisation and control; operating feedback; use of Probabilistic Safety Assessment. The questionnaire was answered by 12 European nuclear power plants, representing 9 different European countries and three different types of reactors (Pressurised Water Reactor, Boiling Water Reactor and Water Water Energy Reactor). Conclusions were drawn under the following headers: Organisational survey and generalities Organisational effectiveness Quality of maintenance Quality of operation Engineering support, management of modification Specific aspects Each analysed subject includes the following topics: Questions background with a summary and the aim of the questions. Current status, that describes common practices, as derived from the answers to the questionnaire, and some examples of good specific practices. Identified good practices. (author)

  20. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    Energy Technology Data Exchange (ETDEWEB)

    Gotcheva, N.; Macchi, L.; Oedewald, P. [Technical Research Centre of Finland (VTT), Espoo (Finland); Eitrheim, M.H.R. [Institute for Energy Technology (IFE) (Norway); Axelsson, C.; Reiman, T.; Pietikaeinen, E. [Ringhals AB (NPP), Vattenfall AB (Sweden)

    2013-04-15

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  1. Shortened outage duration and increased safety with head assembly upgrade packages

    International Nuclear Information System (INIS)

    Leanne, M.; Lisien, P.E.; Plute, K.; Duran, J.

    2007-01-01

    To significantly reduce outage critical path duration and personnel radiation exposure, and to increase personnel safety, Westinghouse Electric Co., LLC has designed and installed upgrades to the existing head assemblies of operating pressurized water reactors. These upgrades are known as Head Assembly Upgrade Packages (HAUPs) or Simplified Head Assemblies (SHAs). Custom configurations are created from a set of standard elements to optimize the design for each unique containment, head assembly configuration, and licensing basis. Two primary options are available for implementation: a full HAUP or targeted component and system upgrades. Plants may achieve much of the outage savings, dose reduction, and safety improvements even with a more limited hardware scope. A range of improvements can be offered from integral missile shields, to redesigned duct work, radiation shields, and cable layout and connection optimization. The hardware changes are customized to target the scope that adds the most value for a given plant. While combining upgrades with a reactor vessel head (RVH) replacement adds some flexibility, it is not necessary. Some plants have chosen to implement targeted upgrades prior to a replacement RVH outage and then complete the remainder of the full HAUP during the replacement RVH outage. Three-dimensional computer aided design tools are used in the conceptual and detailed design phases to identify and avoid interferences between existing and replacement plant components. State-of-the-art computational fluid dynamics models for control drive mechanism (CDM) cooling systems are used to demonstrate the ability to maintain or improve the original design performance while greatly simplifying the disassembly/re-assembly activities. Likewise, state-of-the-art finite element analysis methods allow optimization of structural components while meeting code limits for design basis accident conditions. (authors)

  2. Worldwide OMEGA and Very Low Frequency (VLF) Transmitter Outages, January to December 1980.

    Science.gov (United States)

    1981-05-01

    WORLDWIDE OMEGA AND VERY LOW FREQUENCY IVLF) TRANSMITTER OUTAGE--ETC, MAY 81 L RZONCA ,’,L.ASSI LED FAA-CT-81-26 FAA-RD- B1 -29 UL7 A-I’ l15FDRL AIO...computer for the time period GBR - Rugby , England (16.00 kHz) January to December 1980. (For the purposes of this report, any downtime NA - Cutler, Maine

  3. Partner cooperation with decode-and-forward: Closed-form outage analysis and comparison

    KAUST Repository

    Benjillali, Mustapha

    2013-01-01

    In this paper, we investigate the outage performance of "partner cooperation" based on opportunistic Decodeand- Forward with constrained partial selection and reactive relaying strategies in dual-hop cooperative Nakagami-m fading links. The source/destination, which is based on the unique knowledge of local channel state information, selects the best relay to increase the chances of cooperation in both uplink and downlink communications when the direct link is also available. After deriving new expressions for the cumulative distribution functions of the variables of interest, the outage probability of the system is obtained in closed-form. We also derive the ε-outage capacity in different particular cases, and the obtained results - when the channel model is reduced to a Rayleigh fading - either are new or correspond to those previously obtained in other works. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters and provide a new insight into the design and optimization of cooperative configurations. © 2012 IEEE.

  4. Outage Analysis of Mixed Underlay Cognitive RF MIMO and FSO Relaying with Interference Reduction

    KAUST Repository

    Al-Qahtani, Fawaz S.; El-Malek, Ahmed H. Abd; Ansari, Imran S.; Radaydeh, Redha Mahmoud Mesleh; Zummo, Salam A.

    2017-01-01

    In this paper, we study the outage performance of multiuser mixed underlay radio frequency (RF)/multidestinations free-space optical (FSO) links. For RF links, we consider a secondary network with multiple users that can communicate with multiple destinations through a relaying node. The relay is equipped with an antenna array at the RF side, and it uses the amplify-and-forward (AF) protocol. The primary users (PUs) are equipped with multiple antennas at transmit and receive nodes. The RF link is subjected to the aggregate PUs interference effect on the secondary network. To reduce the effect of PUs interference on secondary network at the relay node, two interference cancellation (IC) schemes are adopted, which vary in terms of complexity and achieved performance. On the other hand, the multidestination FSO links can be exploited to further enhance the quality of the second hop, and their associated channel models account for pointing errors, intensity modulation/direct detection, and heterodyne detection. For the aforementioned system model, we obtain exact and asymptotic closed-form expressions for the end-to-end outage probability. To further enhance system performance, optimal power allocation between the two hops is obtained based on the derived asymptotic outage probability expressions.

  5. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  6. Outage Analysis of Mixed Underlay Cognitive RF MIMO and FSO Relaying with Interference Reduction

    KAUST Repository

    Al-Qahtani, Fawaz S.

    2017-03-22

    In this paper, we study the outage performance of multiuser mixed underlay radio frequency (RF)/multidestinations free-space optical (FSO) links. For RF links, we consider a secondary network with multiple users that can communicate with multiple destinations through a relaying node. The relay is equipped with an antenna array at the RF side, and it uses the amplify-and-forward (AF) protocol. The primary users (PUs) are equipped with multiple antennas at transmit and receive nodes. The RF link is subjected to the aggregate PUs interference effect on the secondary network. To reduce the effect of PUs interference on secondary network at the relay node, two interference cancellation (IC) schemes are adopted, which vary in terms of complexity and achieved performance. On the other hand, the multidestination FSO links can be exploited to further enhance the quality of the second hop, and their associated channel models account for pointing errors, intensity modulation/direct detection, and heterodyne detection. For the aforementioned system model, we obtain exact and asymptotic closed-form expressions for the end-to-end outage probability. To further enhance system performance, optimal power allocation between the two hops is obtained based on the derived asymptotic outage probability expressions.

  7. A novel fusion methodology to bridge GPS outages for land vehicle positioning

    International Nuclear Information System (INIS)

    Chen, Wei; Li, Xu; Song, Xiang; Xu, Qimin; Li, Bin; Song, Xianghui

    2015-01-01

    Many intelligent transportation system applications require accurate, reliable, and continuous vehicle position information whether in open-sky environments or in Global Positioning System (GPS) denied environments. However, there remains a challenging task for land vehicles to achieve such positioning performance using low-cost sensors, especially microelectromechanical system (MEMS) sensors. In this paper, a novel and cost-effective fusion methodology to bridge GPS outages is proposed and applied in the Inertial Navigation System (INS)/GPS/ compass integrated positioning system. In the implementation of the proposed methodology, a key data preprocessing algorithm is first developed to eliminate the noise in inertial sensors in order to provide more accurate information for subsequent modeling. Then, a novel hybrid strategy incorporating the designed autoregressive model (AR model)-based forward estimator (ARFE) with Kalman filter (KF) is presented to predict the INS position errors during GPS outages. To verify the feasibility and effectiveness of the proposed methodology, real road tests with various scenarios were performed. The proposed methodology illustrates significant improvement in positioning accuracy during GPS outages. (paper)

  8. Outage Probability Analysis in Power-Beacon Assisted Energy Harvesting Cognitive Relay Wireless Networks

    Directory of Open Access Journals (Sweden)

    Ngoc Phuc Le

    2017-01-01

    Full Text Available We study the performance of the secondary relay system in a power-beacon (PB assisted energy harvesting cognitive relay wireless network. In our system model, a secondary source node and a relay node first harvest energy from distributed PBs. Then, the source node transmits its data to the destination node with the help of the relay node. Also, fading coefficients of the links from the PBs to the source node and relay node are assumed independent but not necessarily identically distributed (i.n.i.d Nakagami-m random variables. We derive exact expressions for the power outage probability and the channel outage probability. Based on that, we analyze the total outage probability of the secondary relay system. Asymptotic analysis is also performed, which provides insights into the system behavior. Moreover, we evaluate impacts of the primary network on the performance of the secondary network with respect to the tolerant interference threshold at the primary receiver as well as the interference introduced by the primary transmitter at the secondary source and relay nodes. Simulation results are provided to validate the analysis.

  9. Outage Analysis of Cooperative Transmission with Energy Harvesting Relay: Time Switching versus Power Splitting

    Directory of Open Access Journals (Sweden)

    Guanyao Du

    2015-01-01

    Full Text Available This paper investigates the multiuser transmission network with an energy harvesting (EH cooperative relay, where a source transmits independent information to multiple destinations with the help of an energy constrained relay. The relay can harvest energy from the radio frequency (RF signals transmitted from the source, and it helps the multiuser transmission only by consuming the harvested energy. By adopting the time switching and the power splitting relay receiver architectures, we firstly propose two protocols, the time switching cooperative multiuser transmission (TSCMT protocol and the power splitting cooperative multiuser transmission (PSCMT protocol, to enable the simultaneous information processing and EH at the relay for the system. To evaluate the system performance, we theoretically analyze the system outage probability for the two proposed protocols and then derive explicit expressions for each of them, respectively. Numerical results are provided to demonstrate the accuracy of our analytical results and reveal that compared with traditional noncooperative scheme our proposed protocols are green solutions to offer reliable communication and lower system outage probability without consuming additional energy. In particular, for the same transmit power at the source, the PSCMT protocol is superior to the TSCMT protocol to obtain lower system outage probability.

  10. Assessment and Application of the ROSE Code for Reactor Outage Thermal-Hydraulic and Safety Analysis

    International Nuclear Information System (INIS)

    Liang, Thomas K.S.; Ko, F.-K.; Dai, L.-C.

    2001-01-01

    The currently available tools, such as RELAP5, RETRAN, and others, cannot easily and correctly perform the task of analyzing the system behavior during plant outages. Therefore, a medium-sized program aiming at reactor outage simulation and evaluation, such as midloop operation (MLO) with loss of residual heat removal (RHR), has been developed. Important thermal-hydraulic processes involved during MLO with loss of RHR can be properly simulated by the newly developed reactor outage simulation and evaluation (ROSE) code. The two-region approach with a modified two-fluid model has been adopted to be the theoretical basis of the ROSE code.To verify the analytical model in the first step, posttest calculations against the integral midloop experiments with loss of RHR have been performed. The excellent simulation capacity of the ROSE code against the Institute of Nuclear Energy Research Integral System Test Facility test data is demonstrated. To further mature the ROSE code in simulating a full-sized pressurized water reactor, assessment against the WGOTHIC code and the Maanshan momentary-loss-of-RHR event has been undertaken. The successfully assessed ROSE code is then applied to evaluate the abnormal operation procedure (AOP) with loss of RHR during MLO (AOP 537.4) for the Maanshan plant. The ROSE code also has been successfully transplanted into the Maanshan training simulator to support operator training. How the simulator was upgraded by the ROSE code for MLO will be presented in the future

  11. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  12. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  13. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  14. Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages

    International Nuclear Information System (INIS)

    Mayers, J.B.; Soth, L.G.

    1978-04-01

    The objective of the project, conducted by Commonwealth Research Corporation and Westinghouse Electric Corporation, is to identify improvements in procedures and equipment which will reduce the time required for refueling/maintenance outages at PWR nuclear power plants. The outage of Commonwealth Edison Zion Station Unit 1 in March through May of 1976 was evaluated to identify those items which caused delays and those work activities that offer the potential for significant improvements that could reduce the overall duration of the outage and achieve an improvement in the plant's availability for power production. Modifications in procedures have been developed and were evaluated during one or more outages in 1977. Conceptual designs have been developed for equipment modifications to the refueling system that could reduce the time required for the refueling portion of the outage. The purpose of the interim report is to describe those conceptual designs and to assess their impact upon future outages. Recommendations are included for the implementation of these equipment improvements in a continuation of this program as a demonstration of plant availability benefits that can be realized in PWR nuclear plants already in operation or under construction

  15. Pumps in mining

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This article looks at the pump industry as a whole, its historical links with the mining industry, their parallel develop ment, and at the individual manufacturers and pumps, services and auxillary products they have to offer.

  16. Photovoltaic pump systems

    Science.gov (United States)

    Klockgether, J.; Kiessling, K. P.

    1983-09-01

    Solar pump systems for the irrigation of fields and for water supply in regions with much sunshine are discussed. For surface water and sources with a hoisting depth of 12 m, a system with immersion pumps is used. For deep sources with larger hoisting depths, an underwater motor pump was developed. Both types of pump system meet the requirements of simple installation and manipulation, safe operation, maintenance free, and high efficiency reducing the number of solar cells needed.

  17. Rotary magnetic heat pump

    Science.gov (United States)

    Kirol, L.D.

    1987-02-11

    A rotary magnetic heat pump constructed without flow seals or segmented rotor accomplishes recuperation and regeneration by using split flow paths. Heat exchange fluid pumped through heat exchangers and returned to the heat pump splits into two flow components: one flowing counter to the rotor rotation and one flowing with the rotation. 5 figs.

  18. Vertical pump assembly

    International Nuclear Information System (INIS)

    Dohnal, M.; Rosel, J.; Skarka, V.

    1988-01-01

    The mounting is described of the drive assembly of a vertical pump for nuclear power plants in areas with seismic risk. The assembly is attached to the building floor using flexible and damping elements. The design allows producing seismically resistant pumps without major design changes in the existing types of vertical pumps. (E.S.). 1 fig

  19. Detection of pump degradation

    International Nuclear Information System (INIS)

    Casada, D.A.

    1994-01-01

    There are a variety of stressors that can affect the operation of centrifugal pumps. These can generally be classified as: Mechanical; Hydraulic; Tribological; Chemical; and Other (including those associated with the pump driver). Although these general stressors are active in essentially all centrifugal pumps, the stressor level and the extent of wear and degradation can vary greatly. Parameters that affect the extent of stressor activity are manifold. In order to assure the long-term operational readiness of a pump, it is important to both understand the nature and magnitude of the specific degradation mechanisms and to monitor the performance of the pump

  20. Liquid metal pump

    International Nuclear Information System (INIS)

    Pennell, W.E.

    1981-01-01

    A liquid metal pump comprising a shaft support structure which is isolated from the pump housing for better preservation of alignment of shaft bearings. The shaft carries an impeller and the support structure carries an impeller cage which is slidably disposed in a diffuser so as to allow complete removal of pump internals for inspection and repair. The diffuser is concentrically supported in the pump housing which also takes up all reaction forces generated by the discharge of the liquid metal from the diffuser, with floating seals arranged between impeller cage and the diffuser. The space between the diffuser and the pump housing permits the incoming liquid to essentially surround the diffuser. (author)

  1. Jet pump assisted artery

    Science.gov (United States)

    1975-01-01

    A procedure for priming an arterial heat pump is reported; the procedure also has a means for maintaining the pump in a primed state. This concept utilizes a capillary driven jet pump to create the necessary suction to fill the artery. Basically, the jet pump consists of a venturi or nozzle-diffuser type constriction in the vapor passage. The throat of this venturi is connected to the artery. Thus vapor, gas, liquid, or a combination of the above is pumped continuously out of the artery. As a result, the artery is always filled with liquid and an adequate supply of working fluid is provided to the evaporator of the heat pipe.

  2. Pumps for nuclear facilities

    International Nuclear Information System (INIS)

    1999-01-01

    The guide describes how the Finnish Radiation and Nuclear Safety Authority (STUK) controls pumps and their motors at nuclear power plants and other nuclear facilities. The scope of the control is determined by the Safety Class of the pump in question. The various phases of the control are: (1) review of construction plan, (2) control of manufacturing, and construction inspection, (3) commissioning inspection, and (4) control during operation. STUK controls Safety Class 1, 2 and 3 pumps at nuclear facilities as described in this guide. STUK inspects Class EYT (non-nuclear) pumps separately or in connection with the commissioning inspections of the systems. This guide gives the control procedure and related requirements primarily for centrifugal pumps. However, it is also applied to the control of piston pumps and other pump types not mentioned in this guide

  3. Internal pump monitoring device

    International Nuclear Information System (INIS)

    Kurosaki, Toshikazu.

    1996-01-01

    In the present invention, a thermometer is disposed at the upper end of an internal pump casing of a coolant recycling system in a BWR type reactor to detect leakage of reactor water thereby ensuring the improvement of reliability of the internal pump. Namely, a thermometer is disposed, which can detect temperature elevation occurred when water in the internal pump leaked from a reactor pressure vessel passes through the gap between a stretch tube and an upper end of the pump casing. Signals from the thermometer are transmitted to a signal processing device by an instrumentation cable. The signal processing device generates an alarm when the temperature signal exceeds a predetermined value and announces that leakage of reactor water occurs in the internal pump. Since the present invention can detect the leakage of the reactor water in the pump casing in an early stage, it can contribute to the improvement of the safety and reliability of the internal pump. (I.S.)

  4. Pump element for a tube pump

    DEFF Research Database (Denmark)

    2011-01-01

    The invention relates to a tube pump comprising a tube and a pump element inserted in the tube, where the pump element comprises a rod element and a first and a second non-return valve member positioned a distance apart on the rod element. The valve members are oriented in the same direction...... relative to the rod element so as to allow for a fluid flow in the tube through the first valve member, along the rod element, and through the second valve member. The tube comprises an at least partly flexible tube portion between the valve members such that a repeated deformation of the flexible tube...... portion acts to alternately close and open the valve members thereby generating a fluid flow through the tube. The invention further relates to a pump element comprising at least two non-return valve members connected by a rod element, and for insertion in an at least partly flexible tube in such tube...

  5. Pumping behavior of sputtering ion pump

    Energy Technology Data Exchange (ETDEWEB)

    Chou, T.S.; Bittner, J.; Schuchman, J.

    1991-12-31

    To optimize the design of a distributed ion pump (DIP) for the Superconducting X-Ray Lithography Source (SXLS) the stability of the rotating electron cloud at very high magnetic field beyond transition, must be re-examined. In this work the pumping speed and frequency spectrum of a DIP at various voltages (1 to 10 KV) and various magnetic fields (0.1 to 4 Tesla) are measured. Three cell diameters 10 mm, 5 mm and 2.5 mm, each 8 mm long, and with 3 or 4 mm gaps between anode and cathode are investigated. In this study both the titanium cathodes and the stainless steel anode plates are perforated with holes comparable in size to the anode cell diameters. Only the partially saturated pumping behavior is under investigation. The ultimate pressure and conditioning of the pump will be investigated at a later date when the stability criterion for the electron cloud is better understood.

  6. Pumping behavior of sputtering ion pump

    Energy Technology Data Exchange (ETDEWEB)

    Chou, T.S.; Bittner, J.; Schuchman, J.

    1991-01-01

    To optimize the design of a distributed ion pump (DIP) for the Superconducting X-Ray Lithography Source (SXLS) the stability of the rotating electron cloud at very high magnetic field beyond transition, must be re-examined. In this work the pumping speed and frequency spectrum of a DIP at various voltages (1 to 10 KV) and various magnetic fields (0.1 to 4 Tesla) are measured. Three cell diameters 10 mm, 5 mm and 2.5 mm, each 8 mm long, and with 3 or 4 mm gaps between anode and cathode are investigated. In this study both the titanium cathodes and the stainless steel anode plates are perforated with holes comparable in size to the anode cell diameters. Only the partially saturated pumping behavior is under investigation. The ultimate pressure and conditioning of the pump will be investigated at a later date when the stability criterion for the electron cloud is better understood.

  7. Outage performance of two-way DF relaying systems with a new relay selection metric

    KAUST Repository

    Hyadi, Amal

    2012-04-01

    This paper investigates a new constrained relay selection scheme for two-way relaying systems where two end terminals communicate simultaneously via a relay. The introduced technique is based on the maximization of the weighted sum rate of both users. To evaluate the performance of the proposed system, the outage probability is derived in a general case (where an arbitrary channel is considered), and then over independently but not necessarily identically distributed (i.n.i.d.) Rayleigh fading channels. The analytical results are verified through simulations. © 2012 IEEE.

  8. Outage and BER analysis for ultrawideband-based WPAN in Nakagami-m fading channels

    KAUST Repository

    Mehbodniya, Abolfazl

    2011-09-01

    This paper presents a performance analysis of multiband orthogonal frequency-division multiplexing (MB-OFDM) in ultra wideband (UWB)-based personal area networks (UPANs). A UPAN consists of devices with different UWB technologies at the physical layer. Approximate expressions for the outage probability and average bit error rate (BER) are derived in closed form for the MB-OFDM target receiver, taking into account multi-user interference (MUI), as well as external interference in the form of time-hopping (TH) and direct-sequence (DS) UWB signals. © 2010 IEEE.

  9. A study on assessment methodology of surveillance test interval and allowed outage time

    International Nuclear Information System (INIS)

    Che, Moo Seong; Cheong, Chang Hyeon; Lee, Byeong Cheol

    1996-07-01

    The objectives of this study is the development of methodology by which assessing the optimizes Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korea nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches is performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method

  10. Exact outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel; Yang, Hongchuan; Alouini, Mohamed-Slim

    2010-01-01

    In this paper, we investigate a dual-hop decode-andforward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. In our study, we derive exact closed-form expression for the outage probability based on the exact statistics of each hop. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2010 IEEE.

  11. Exact outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel

    2010-11-01

    In this paper, we investigate a dual-hop decode-andforward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. In our study, we derive exact closed-form expression for the outage probability based on the exact statistics of each hop. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2010 IEEE.

  12. Efficient Outage Probability Evaluation of Diversity Receivers Over Generalized Gamma Channels

    KAUST Repository

    Ben Issaid, Chaouki; Alouini, Mohamed-Slim; Tempone, Raul

    2016-01-01

    In this paper, we are interested in determining the cumulative distribution function of the sum of generalized Gamma in the setting of rare event simulations. To this end, we present an efficient importance sampling estimator. The main result of this work is the bounded relative property of the proposed estimator. This result is used to accurately estimate the outage probability of multibranch maximum ratio combining and equal gain combining diversity receivers over generalized Gamma fading channels. Selected numerical simulations are discussed to show the robustness of our estimator compared to naive Monte Carlo.

  13. A study on assessment methodology of surveillance test interval and allowed outage time

    Energy Technology Data Exchange (ETDEWEB)

    Che, Moo Seong; Cheong, Chang Hyeon; Lee, Byeong Cheol [Seoul Nationl Univ., Seoul (Korea, Republic of)] (and others)

    1996-07-15

    The objectives of this study is the development of methodology by which assessing the optimizes Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korea nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches is performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method.

  14. Efficient Outage Probability Evaluation of Diversity Receivers Over Generalized Gamma Channels

    KAUST Repository

    Ben Issaid, Chaouki

    2016-10-01

    In this paper, we are interested in determining the cumulative distribution function of the sum of generalized Gamma in the setting of rare event simulations. To this end, we present an efficient importance sampling estimator. The main result of this work is the bounded relative property of the proposed estimator. This result is used to accurately estimate the outage probability of multibranch maximum ratio combining and equal gain combining diversity receivers over generalized Gamma fading channels. Selected numerical simulations are discussed to show the robustness of our estimator compared to naive Monte Carlo.

  15. An Internet of Things Approach to Electrical Power Monitoring and Outage Reporting

    Energy Technology Data Exchange (ETDEWEB)

    Koch, Daniel B [ORNL

    2017-01-01

    The so-called Internet of Things concept has captured much attention recently as ordinary devices are connected to the Internet for monitoring and control purposes. One enabling technology is the proliferation of low-cost, single board computers with built-in network interfaces. Some of these are capable of hosting full-fledged operating systems that provide rich programming environments. Taken together, these features enable inexpensive solutions for even traditional tasks such as the one presented here for electrical power monitoring and outage reporting.

  16. Outage and ser performance of an opportunistic multi-user underlay cognitive network

    KAUST Repository

    Khan, Fahd Ahmed

    2012-10-01

    Consider a multi-user underlay cognitive network where multiple cognitive users concurrently share the spectrum with a primary network and a single secondary user is selected for transmission. The channel is assumed to have independent but not identical Nakagami-m fading. Closed form expressions for the outage performance and the symbol-error-rate performance of the opportunistic multi-user secondary network are derived when a peak interference power constraint is imposed on the secondary network in addition to the limited peak transmit power of each secondary user. © 2012 IEEE.

  17. Psychosocial work strain of maintenance personnel during annual outage and normal operation in a nuclear power plant

    International Nuclear Information System (INIS)

    Jacobsson, L.; Svensson, O.

    1991-01-01

    This paper reports on a study which evaluates psychosocial work demands during the annual outage for a maintenance work group in a nuclear power plant. The study is based on a stress paradigm and it has been asserted that increased work strain would have a negative effect on performance. Nineteen workers, aged 20-55 years, participated in the study. The subjects filled out a questionnaire comparing work strain during annual outage and normal operation. During the outage period a 3-shift 24-hour work schedule, including nightwork, was used (working hours during normal operation was 7-16). Increased demands on concentration and vigilance, increased time pressure and strain on social relations within the group were found to characterize work during annual outage. Interestingly, for specific work tasks an association was found between the risk of making errors and high psychological workload. Increased work strain, shiftwork including nightwork and reduced social support are important psychosocial risk factors that might contribute to human error during the outage period

  18. Outage probability analysis of a secondary user in an underlay dual hop cognitive amplify and forward relay network

    Directory of Open Access Journals (Sweden)

    Kiran Chandra

    2016-09-01

    Full Text Available This paper presents the performance evaluation of a secondary user (SU in an underlay cognitive dual-hop relaying system considering instantaneous as well as average channel information of the interfering links (from the secondary source and relay to the primary receiver and the data link from the secondary source to relay, to calculate transmit power and amplifying gain of secondary system. Comparison of above mentioned cases is done for two different scenarios – with direct path and without direct path. We evaluate the performance considering two different diversity techniques namely as selection combining (SC and maximum ratio combining (MRC. The effect of different fading channels (Rayleigh and Nakagami on the outage performance of the SU for the two diversity techniques is also shown. The outage probability of the SU is reduced when the diversity techniques are used (with direct path as compared to the outage probability of SU without direct path. We find that the outage performance is better for instantaneous channel information as compared to average channel information for the links. We observe that MRC provides better performance than SC. Furthermore, this work shows that the outage performance of the SU has been improved when the Nakagami fading channel (m = 2 is considered instead of Rayleigh fading channel.

  19. Economic costs of electrical system instability and power outages caused by snakes on the Island of Guam

    Science.gov (United States)

    Fritts, T.H.

    2002-01-01

    The Brown Tree Snake, Boiga irregularis, is an introduced species on Guam where it causes frequent electrical power outages. The snake's high abundance, its propensity for climbing, and use of disturbed habitats all contribute to interruption of Guam's electrical service and the activities that depend on electrical power. Snakes have caused more than 1600 power outages in the 20-yr period of 1978–1997 and most recently nearly 200 outages per year. Single outages spanning the entire island and lasting 8 or more hours are estimated to cost in excess of $3,000,000 in lost productivity, but the costs of outages that involve only parts of the island or those of shorter durations are more difficult to quantify. Costs to the island's economy have exceeded $4.5 M $4.5M"> per year over a 7-yr period without considering repair costs, damage to electrical equipment, and lost revenues. Snakes pose the greatest problem on high voltage transmission lines, on transformers, and inside electrical substations.

  20. Electrokinetic pumps and actuators

    International Nuclear Information System (INIS)

    Phillip M. Paul

    2000-01-01

    Flow and ionic transport in porous media are central to electrokinetic pumping as well as to a host of other microfluidic devices. Electrokinetic pumping provides the ability to create high pressures (to over 10,000 psi) and high flow rates (over 1 mL/min) with a device having no moving parts and all liquid seals. The electrokinetic pump (EKP) is ideally suited for applications ranging from a high pressure integrated pump for chip-scale HPLC to a high flow rate integrated pump for forced liquid convection cooling of high-power electronics. Relations for flow rate and current fluxes in porous media are derived that provide a basis for analysis of complex microfluidic systems as well as for optimization of electrokinetic pumps

  1. Electrokinetic pumps and actuators

    Energy Technology Data Exchange (ETDEWEB)

    Phillip M. Paul

    2000-03-01

    Flow and ionic transport in porous media are central to electrokinetic pumping as well as to a host of other microfluidic devices. Electrokinetic pumping provides the ability to create high pressures (to over 10,000 psi) and high flow rates (over 1 mL/min) with a device having no moving parts and all liquid seals. The electrokinetic pump (EKP) is ideally suited for applications ranging from a high pressure integrated pump for chip-scale HPLC to a high flow rate integrated pump for forced liquid convection cooling of high-power electronics. Relations for flow rate and current fluxes in porous media are derived that provide a basis for analysis of complex microfluidic systems as well as for optimization of electrokinetic pumps.

  2. Outage performance of opportunistic two-way amplify-and-forward relaying with outdated channel state information

    KAUST Repository

    Hwang, Kyusung

    2013-09-01

    In this paper, we study the outage performance of an amplify-and-forward (AF)-based two-way relaying (TWR) system with multiple relays where a single relay selection is performed based on outdated channel state information (CSI). Specifically, we propose a single relay selection scheme in AF-based TWR system under outdated CSI conditions. With this policy, we offer a statistical analysis of the signal-to-noise ratio per hop and analyze the outage probability with asymmetric outage thresholds based on CSI-assisted AF protocol. Additionally, we provide the exact and asymptotic expressions based on the provided statistical/joint statistical analyses of a dual-hop AF transmission. Finally, we verify our analytical results with some selected computer-based simulation results. © 1972-2012 IEEE.

  3. Performance Analysis of Secrecy Outage Probability for AF-Based Partial Relay Selection with Outdated Channel Estimates

    Directory of Open Access Journals (Sweden)

    Kyu-Sung Hwang

    2017-01-01

    Full Text Available We study the secrecy outage probability of the amplify-and-forward (AF relaying protocol, which consists of one source, one destination, multiple relays, and multiple eavesdroppers. In this system, the aim is to transmit the confidential messages from a source to a destination via the selected relay in presence of eavesdroppers. Moreover, partial relay selection scheme is utilized for relay selection based on outdated channel state information where only neighboring channel information (source-relays is available and passive eavesdroppers are considered where a transmitter does not have any knowledge of eavesdroppers’ channels. Specifically, we offer the exact secrecy outage probability of the proposed system in a one-integral form as well as providing the asymptotic secrecy outage probability in a closed-form. Numerical examples are given to verify our provided analytical results for different system conditions.

  4. Outage probability of dual-hop partial relay selection with feedback delay in the presence of interference

    KAUST Repository

    Al-Qahtani, Fawaz S.

    2011-09-01

    In this paper, we investigate the outage performance of a dual-hop relaying systems with partial relay selection and feedback delay. The analysis considers the case of Rayleigh fading channels when the relaying station as well as the destination undergo mutually independent interfering signals. Particularly, we derive the cumulative distribution function (c.d.f.) of a new type of random variable involving sum of multiple independent exponential random variables, based on which, we present closed-form expressions for the exact outage probability of a fixed amplify-and-forward (AF) and decode-and-forward (DF) relaying protocols. Numerical results are provided to illustrate the joint effect of the delayed feedback and co-channel interference on the outage probability. © 2011 IEEE.

  5. Detection of pump degradation

    International Nuclear Information System (INIS)

    Greene, R.H.; Casada, D.A.; Ayers, C.W.

    1995-08-01

    This Phase II Nuclear Plant Aging Research study examines the methods of detecting pump degradation that are currently employed in domestic and overseas nuclear facilities. This report evaluates the criteria mandated by required pump testing at U.S. nuclear power plants and compares them to those features characteristic of state-of-the-art diagnostic programs and practices currently implemented by other major industries. Since the working condition of the pump driver is crucial to pump operability, a brief review of new applications of motor diagnostics is provided that highlights recent developments in this technology. The routine collection and analysis of spectral data is superior to all other technologies in its ability to accurately detect numerous types and causes of pump degradation. Existing ASME Code testing criteria do not require the evaluation of pump vibration spectra but instead overall vibration amplitude. The mechanical information discernible from vibration amplitude analysis is limited, and several cases of pump failure were not detected in their early stages by vibration monitoring. Since spectral analysis can provide a wealth of pertinent information concerning the mechanical condition of rotating machinery, its incorporation into ASME testing criteria could merit a relaxation in the monthly-to-quarterly testing schedules that seek to verify and assure pump operability. Pump drivers are not included in the current battery of testing. Operational problems thought to be caused by pump degradation were found to be the result of motor degradation. Recent advances in nonintrusive monitoring techniques have made motor diagnostics a viable technology for assessing motor operability. Motor current/power analysis can detect rotor bar degradation and ascertain ranges of hydraulically unstable operation for a particular pump and motor set. The concept of using motor current or power fluctuations as an indicator of pump hydraulic load stability is presented

  6. Detection of pump degradation

    Energy Technology Data Exchange (ETDEWEB)

    Greene, R.H.; Casada, D.A.; Ayers, C.W. [and others

    1995-08-01

    This Phase II Nuclear Plant Aging Research study examines the methods of detecting pump degradation that are currently employed in domestic and overseas nuclear facilities. This report evaluates the criteria mandated by required pump testing at U.S. nuclear power plants and compares them to those features characteristic of state-of-the-art diagnostic programs and practices currently implemented by other major industries. Since the working condition of the pump driver is crucial to pump operability, a brief review of new applications of motor diagnostics is provided that highlights recent developments in this technology. The routine collection and analysis of spectral data is superior to all other technologies in its ability to accurately detect numerous types and causes of pump degradation. Existing ASME Code testing criteria do not require the evaluation of pump vibration spectra but instead overall vibration amplitude. The mechanical information discernible from vibration amplitude analysis is limited, and several cases of pump failure were not detected in their early stages by vibration monitoring. Since spectral analysis can provide a wealth of pertinent information concerning the mechanical condition of rotating machinery, its incorporation into ASME testing criteria could merit a relaxation in the monthly-to-quarterly testing schedules that seek to verify and assure pump operability. Pump drivers are not included in the current battery of testing. Operational problems thought to be caused by pump degradation were found to be the result of motor degradation. Recent advances in nonintrusive monitoring techniques have made motor diagnostics a viable technology for assessing motor operability. Motor current/power analysis can detect rotor bar degradation and ascertain ranges of hydraulically unstable operation for a particular pump and motor set. The concept of using motor current or power fluctuations as an indicator of pump hydraulic load stability is presented.

  7. Fundamental Limits of Parallel Optical Wireless Channels: Capacity Results and Outage Formulation

    KAUST Repository

    Chaaban, Anas; Rezki, Zouheir; Alouini, Mohamed-Slim

    2016-01-01

    Multi-channel (MC) optical wireless communication (OWC) systems employing wave-division multiplexing for outdoors free-space optical communications, or multi-user timedivision multiple access for indoors visible-light communications, e.g., can be modeled as parallel channels. Multi-input multioutput OWC systems can also be transformed, possibly with some performance loss, to parallel channels using pre-/postcoding. Studying the performance of such MC-OWC systems requires characterizing the capacity of the underlying parallel channels. In this paper, upper and lower bounds on the capacity of constant parallel OWC channels with a total average intensity constraint are derived. Then, the paper focuses on finding intensity allocations that maximize the lower bounds given channel-state information at the transmitter (CSIT). Due to its nonconvexity, the KKT conditions are used to describe a list of candidate allocations. Instead searching exhaustively for the best solution, low-complexity near-optimal algorithms are proposed. The resulting optimized lower bound nearly coincides with capacity at high signal-to-noise ratio (SNR). Under a quasi-static channel model and in the absence of CSIT, outage probability upper and lower bounds are derived. Those bounds also meet at high SNR, thus characterizing the outage capacity in this regime. Finally, the results are extended to a system with both average and peak intensity constraints.

  8. LIDAR AND INS FUSION IN PERIODS OF GPS OUTAGES FOR MOBILE LASER SCANNING MAPPING SYSTEMS

    Directory of Open Access Journals (Sweden)

    I. Klein

    2012-09-01

    Full Text Available Mobile laser scanning systems are becoming an increasingly popular means to obtain 3D coverage on a large scale. To perform the mapping, the exact position of the vehicle must be known throughout the trajectory. Exact position is achieved via integration of Global Positioning Systems (GPS and Inertial Navigation Systems (INS. Yet, in urban environments, cases of complete or even partial GPS outages may occur leaving the navigation solution to rely only on the INS. The INS navigation solution degrades with time as the Inertial Measurement Unit (IMU measurements contains noise, which permeates into the navigation equations. Degradation of the position determination leads to loss of data in such segments. To circumvent such drift and its effects, we propose fusing INS with lidar data by using building edges. This detection of edges is then translated into position data, which is used as an aiding to the INS. It thereby enables the determination of the vehicle position with a satisfactory level accuracy, sufficient to perform the laser-scanning based mapping in those outage periods.

  9. Global NDE Best Practice for Technology Improvement, Outage Management, Foreign Material Exclusion and Dose Control

    International Nuclear Information System (INIS)

    Glass, S. W.; Mohr, F.

    2010-01-01

    Non Destructive Examination (NDE) is a critical element of both Boiling Water and Pressurized Water Reactor outages. Frequently this includes critical path activity so both the utility and the inspection vendor are under intense pressure to perform the work quickly. Concurrent with AREVA's new global organization of NDE resources, AREVA NDE SOLUTIONS, efforts have intensified for global application of lessons learned and best practices. These best practices include new developments as well as continuous improvements to well established tools and NDE techniques. Advancements range from steam generator robots, advanced steam generator deposit characterization sensors and method, new phased array approaches for PWR and BWR reactor vessel examination, new sensors and approaches for RPV head examinations, plus advanced internals examination robots and methods. In addition to specialized tools and techniques, best practice includes numerous management innovations. AREVA's multi-disciplined integrated nuclear worker strategy helps to minimize the total number of personnel deployed to multi-task outages. Specific design and on-site practice has been implemented to minimize or eliminate foreign material from the reactor system and vigorous pursuit of dose management practices keeps our nuclear worker dose as low as reasonably achievable. The industry is moving to much more conservative nuclear worker dose limits. While this is proving to be an issue with many vendors, AREVA has had an internal policy of <2R since 2006. Globalizing the organization also helps AREVA manage peaks and unplanned emergency inspections from an enlarged pool of globally qualified inspection personnel and tools. (Author)

  10. Key Issues for the control of refueling outage duration and costs in PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Degrave, Claude

    2002-01-01

    For several years, EDF, within the framework of the CIDEM1 project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories Design, Maintenance and Logistic Support, Outage Management. Most of the key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  11. Key issues for the control of refueling outage duration and costs in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    2000-01-01

    For several years, EDF, within the framework of the CIDEM project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories: Design; Maintenance and Logistic Support; Outage Management. Most key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  12. Outage Analysis of Practical FSO/RF Hybrid System With Adaptive Combining

    KAUST Repository

    Rakia, Tamer

    2015-08-01

    Hybrid free-space optical (FSO)/radio-frequency (RF) systems have emerged as a promising solution for high-data-rate wireless transmission. We present and analyze a transmission scheme for the hybrid FSO/RF communication system based on adaptive combining. Specifically, only FSO link is active as long as the instantaneous signal-to-noise ratio (SNR) at the FSO receiver is above a certain threshold level. When it falls below this threshold level, the RF link is activated along with the FSO link and the signals from the two links are combined at the receiver using a dual-branch maximal ratio combiner. Novel analytical expression for the cumulative distribution function (CDF) of the received SNR for the proposed hybrid system is obtained. This CDF expression is used to study the system outage performance. Numerical examples are presented to compare the outage performance of the proposed hybrid FSO/RF system with that of the FSO-only and RF-only systems. © 1997-2012 IEEE.

  13. Nonparametric Tree-Based Predictive Modeling of Storm Outages on an Electric Distribution Network.

    Science.gov (United States)

    He, Jichao; Wanik, David W; Hartman, Brian M; Anagnostou, Emmanouil N; Astitha, Marina; Frediani, Maria E B

    2017-03-01

    This article compares two nonparametric tree-based models, quantile regression forests (QRF) and Bayesian additive regression trees (BART), for predicting storm outages on an electric distribution network in Connecticut, USA. We evaluated point estimates and prediction intervals of outage predictions for both models using high-resolution weather, infrastructure, and land use data for 89 storm events (including hurricanes, blizzards, and thunderstorms). We found that spatially BART predicted more accurate point estimates than QRF. However, QRF produced better prediction intervals for high spatial resolutions (2-km grid cells and towns), while BART predictions aggregated to coarser resolutions (divisions and service territory) more effectively. We also found that the predictive accuracy was dependent on the season (e.g., tree-leaf condition, storm characteristics), and that the predictions were most accurate for winter storms. Given the merits of each individual model, we suggest that BART and QRF be implemented together to show the complete picture of a storm's potential impact on the electric distribution network, which would allow for a utility to make better decisions about allocating prestorm resources. © 2016 Society for Risk Analysis.

  14. Zero-Outage Cellular Downlink with Fixed-Rate D2D Underlay

    DEFF Research Database (Denmark)

    Kiilerich Pratas, Nuno; Popovski, Petar

    2015-01-01

    . D2D connections can be instrumental in localized aggregation of uplink M2M traffic to a more capable cellular device, before being finally delivered to the Base Station (BS). In this paper we show that a fixed M2M rate is an enabler of efficient Machine-Type D2D underlay operation taking place......, but not the interfering channels from the MTDs to U, we prove that there is a positive downlink rate that can always be decoded by U, leading to zero-outage of the downlink signal. This is a rather surprising consequence of the features of the multiple access channel and the fixed rate RM. We also consider the case...... of a simpler, single-user decoder at U with successive interference cancellation. However, with single-user decoder, a positive zero-outage rate exists only when NM = 1 and is zero when NM > 1. This implies that joint decoding is instrumental in enabling fixed-rate underlay operation....

  15. Inducement of IGA/SCC in Inconel 600 steam generator tubing during unit outages

    Energy Technology Data Exchange (ETDEWEB)

    Durance, D.; Sedman, K. [Bruce Power, Tiverton, Ontario (Canada); Roberts, J. [CANTECH Associates Ltd., Burlington, Ontario (Canada); King, P. [Babcock and Wilcox Canada, Cambridge, Ontario (Canada); Gorman, J. [Dominion Engineering, Reston, VA (United States); Allen, R. [Kinectrics, Inc., Toronto, Ontario (Canada)

    2008-07-01

    The degradation of Unit 4 SG tubing by IGA/SCC has limited both the operating period and end of life predictions for Unit 4 since restart in late 2003. The circumferential IGA/SCC has been most significant in SG4 with substantial increases in both initiation and growth rates from 2005 through the spring of 2007. A detailed review of the occurrence of circumferential OD IGA/SCC at the RTZ in the HL TTS region of Bruce 4 steam generator tubes has led a conclusion that it is probable that the IGA/SCC has been the result of attack by partially reduced sulfur species such as tetrathionates and thiosulfates during periods of low temperature exposure. It is believed that attack of this type has mostly likely occurred during startup evolutions following outages as the result the development of aggressive reduced sulfur species in the TTS region during periods when the boilers were fully drained for maintenance activities. The modification of outage practices to limit secondary side oxygen ingress in the spring of 2007 has apparently arrested the degradation and has had significant affects on the allowable operating interval and end of life predictions for the entire unit. (author)

  16. Inducement of IGA/SCC in Inconel 600 steam generator tubing during unit outages

    International Nuclear Information System (INIS)

    Durance, D.; Sedman, K.; Roberts, J.; King, P.; Gorman, J.; Allen, R.

    2008-01-01

    The degradation of Unit 4 SG tubing by IGA/SCC has limited both the operating period and end of life predictions for Unit 4 since restart in late 2003. The circumferential IGA/SCC has been most significant in SG4 with substantial increases in both initiation and growth rates from 2005 through the spring of 2007. A detailed review of the occurrence of circumferential OD IGA/SCC at the RTZ in the HL TTS region of Bruce 4 steam generator tubes has led a conclusion that it is probable that the IGA/SCC has been the result of attack by partially reduced sulfur species such as tetrathionates and thiosulfates during periods of low temperature exposure. It is believed that attack of this type has mostly likely occurred during startup evolutions following outages as the result the development of aggressive reduced sulfur species in the TTS region during periods when the boilers were fully drained for maintenance activities. The modification of outage practices to limit secondary side oxygen ingress in the spring of 2007 has apparently arrested the degradation and has had significant affects on the allowable operating interval and end of life predictions for the entire unit. (author)

  17. Optimal utilization of outages. The tasks of the OEM and/or service provider

    International Nuclear Information System (INIS)

    Jakobs, Norbert; Grauf, Eberhard

    1998-01-01

    The deregulation of Europe's power market on January 1, 1999 will force many electric utilities and especially nuclear power plant operators to introduce extensive cost-cutting measures in order that they can hold their own in the new competitive environment. Existing plants basically have three potential ways of reducing their power generating costs: by increasing availability, reducing fuel costs and cutting back operating costs. Optimizing plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of performance time and cost, there are a number of starting points based on certain key factors: organization, planning, logistics, performance monitoring, plant and equipment enhancements as well as personnel motivation. To reach this goal it is necessary for the original equipment manufacturer (OEM) and/or service provider to be involved in these activities to a much greater extent than before and for a closer form of partnership to be established with the consumer. For it is only within a team having a common set of goals that the successes of the past have been able to be achieved and new tasks can be efficiently handled in the future. (author)

  18. Placement of Synchronized Measurements for Power System Observability during Cascaded Outages

    Science.gov (United States)

    Thirugnanasambandam, Venkatesh; Jain, Trapti

    2017-11-01

    Cascaded outages often result in power system islanding followed by a blackout and therefore considered as a severe disturbance. Maintaining the observability of each island may help in taking proper control actions to preserve the stability of individual islands thus, averting system collapse. With this intent, a strategy for placement of synchronized measurements, which can be obtained from phasor measurement units (PMU), has been proposed in this paper to keep the system observable during cascaded outages also. Since, all the cascaded failures may not lead to islanding situations, therefore, failures leading to islanding as well as non-islanding situations have been considered. A topology based algorithm has been developed to identify the islanding/non-islanding condition created by a particular cascaded event. Additional contingencies such as single line loss and single PMU failure have also been considered after the occurrence of cascaded events. The proposed method is further extended to incorporate the measurement redundancy, which is desirable for a reliable state estimation. The proposed scheme is tested on IEEE 14-bus, IEEE 30-bus and a practical Indian 246-bus networks. The numerical results ensure the observability of the power system under system intact as well as during cascaded islanding and non-islanding disturbances.

  19. Fast Outage Probability Simulation for FSO Links with a Generalized Pointing Error Model

    KAUST Repository

    Ben Issaid, Chaouki

    2017-02-07

    Over the past few years, free-space optical (FSO) communication has gained significant attention. In fact, FSO can provide cost-effective and unlicensed links, with high-bandwidth capacity and low error rate, making it an exciting alternative to traditional wireless radio-frequency communication systems. However, the system performance is affected not only by the presence of atmospheric turbulences, which occur due to random fluctuations in the air refractive index but also by the existence of pointing errors. Metrics, such as the outage probability which quantifies the probability that the instantaneous signal-to-noise ratio is smaller than a given threshold, can be used to analyze the performance of this system. In this work, we consider weak and strong turbulence regimes, and we study the outage probability of an FSO communication system under a generalized pointing error model with both a nonzero boresight component and different horizontal and vertical jitter effects. More specifically, we use an importance sampling approach which is based on the exponential twisting technique to offer fast and accurate results.

  20. An Efficient Simulation Scheme of the Outage Probability with Co-Channel Interference

    KAUST Repository

    Rached, Nadhir B.

    2016-03-28

    © 2015 IEEE. The outage probability (OP) of the signal-to-interference-plus-noise ratio (SINR) is an important metric used to evaluate the performance of wireless communication systems operating over fading channels. One major difficulty toward assessing the OP is that, in most of the realistic scenarios, closed-form expressions cannot be derived. This is for instance the case of Log-normal fading environments, in which evaluating the OP of the SINR amounts to computing the probability that a sum of correlated Log-normal variates exceeds a given threshold. Since such a probability is not known to admit a closed-form expression, it has thus far been evaluated by several approximation techniques, the accuracies of which are unfortunately not guaranteed in the interesting region of small outage probabilities. For these regions, simulation techniques based on variance reduction algorithms can represent a good alternative, being well-recognized to be quick and highly accurate for estimating rare event probabilities. This constitutes the major motivation behind our work. More specifically, we propose an efficient importance sampling approach which is based on a covariance matrix scaling technique and illustrate its computational gain over naive Monte Carlo simulations through some selected simulation results.

  1. Fundamental Limits of Parallel Optical Wireless Channels: Capacity Results and Outage Formulation

    KAUST Repository

    Chaaban, Anas

    2016-10-26

    Multi-channel (MC) optical wireless communication (OWC) systems employing wave-division multiplexing for outdoors free-space optical communications, or multi-user timedivision multiple access for indoors visible-light communications, e.g., can be modeled as parallel channels. Multi-input multioutput OWC systems can also be transformed, possibly with some performance loss, to parallel channels using pre-/postcoding. Studying the performance of such MC-OWC systems requires characterizing the capacity of the underlying parallel channels. In this paper, upper and lower bounds on the capacity of constant parallel OWC channels with a total average intensity constraint are derived. Then, the paper focuses on finding intensity allocations that maximize the lower bounds given channel-state information at the transmitter (CSIT). Due to its nonconvexity, the KKT conditions are used to describe a list of candidate allocations. Instead searching exhaustively for the best solution, low-complexity near-optimal algorithms are proposed. The resulting optimized lower bound nearly coincides with capacity at high signal-to-noise ratio (SNR). Under a quasi-static channel model and in the absence of CSIT, outage probability upper and lower bounds are derived. Those bounds also meet at high SNR, thus characterizing the outage capacity in this regime. Finally, the results are extended to a system with both average and peak intensity constraints.

  2. Knowledge to Action - Understanding Natural Hazards-Induced Power Outage Scenarios for Actionable Disaster Responses

    Science.gov (United States)

    Kar, B.; Robinson, C.; Koch, D. B.; Omitaomu, O.

    2017-12-01

    The Sendai Framework for Disaster Risk Reduction 2015-2030 identified the following four priorities to prevent and reduce disaster risks: i) understanding disaster risk; ii) strengthening governance to manage disaster risk; iii) investing in disaster risk reduction for resilience and; iv) enhancing disaster preparedness for effective response, and to "Build Back Better" in recovery, rehabilitation and reconstruction. While forecasting and decision making tools are in place to predict and understand future impacts of natural hazards, the knowledge to action approach that currently exists fails to provide updated information needed by decision makers to undertake response and recovery efforts following a hazard event. For instance, during a tropical storm event advisories are released every two to three hours, but manual analysis of geospatial data to determine potential impacts of the event tends to be time-consuming and a post-event process. Researchers at Oak Ridge National Laboratory have developed a Spatial Decision Support System that enables real-time analysis of storm impact based on updated advisory. A prototype of the tool that focuses on determining projected power outage areas and projected duration of outages demonstrates the feasibility of integrating science with decision making for emergency management personnel to act in real time to protect communities and reduce risk.

  3. Exploiting Outage and Error Probability of Cooperative Incremental Relaying in Underwater Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Hina Nasir

    2016-07-01

    Full Text Available This paper embeds a bi-fold contribution for Underwater Wireless Sensor Networks (UWSNs; performance analysis of incremental relaying in terms of outage and error probability, and based on the analysis proposition of two new cooperative routing protocols. Subject to the first contribution, a three step procedure is carried out; a system model is presented, the number of available relays are determined, and based on cooperative incremental retransmission methodology, closed-form expressions for outage and error probability are derived. Subject to the second contribution, Adaptive Cooperation in Energy (ACE efficient depth based routing and Enhanced-ACE (E-ACE are presented. In the proposed model, feedback mechanism indicates success or failure of data transmission. If direct transmission is successful, there is no need for relaying by cooperative relay nodes. In case of failure, all the available relays retransmit the data one by one till the desired signal quality is achieved at destination. Simulation results show that the ACE and E-ACE significantly improves network performance, i.e., throughput, when compared with other incremental relaying protocols like Cooperative Automatic Repeat reQuest (CARQ. E-ACE and ACE achieve 69% and 63% more throughput respectively as compared to CARQ in hard underwater environment.

  4. Spatial generalized linear mixed models of electric power outages due to hurricanes and ice storms

    International Nuclear Information System (INIS)

    Liu Haibin; Davidson, Rachel A.; Apanasovich, Tatiyana V.

    2008-01-01

    This paper presents new statistical models that predict the number of hurricane- and ice storm-related electric power outages likely to occur in each 3 kmx3 km grid cell in a region. The models are based on a large database of recent outages experienced by three major East Coast power companies in six hurricanes and eight ice storms. A spatial generalized linear mixed modeling (GLMM) approach was used in which spatial correlation is incorporated through random effects. Models were fitted using a composite likelihood approach and the covariance matrix was estimated empirically. A simulation study was conducted to test the model estimation procedure, and model training, validation, and testing were done to select the best models and assess their predictive power. The final hurricane model includes number of protective devices, maximum gust wind speed, hurricane indicator, and company indicator covariates. The final ice storm model includes number of protective devices, ice thickness, and ice storm indicator covariates. The models should be useful for power companies as they plan for future storms. The statistical modeling approach offers a new way to assess the reliability of electric power and other infrastructure systems in extreme events

  5. Outage performance analysis of underlay cognitive RF and FSO wireless channels

    KAUST Repository

    Ansari, Imran Shafique

    2014-09-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channel cascaded with a free-space optical (FSO) link is presented. For the RF link, an underlay cognitive network is considered where the secondary users share the spectrum with licensed primary users. Indoor femtocells act as a practical example for such networks. More specifically, it is assumed that the RF link applies power control to maintain the interference at the primary network below a predetermined threshold. While the RF channel is modeled by the Rayleigh fading distribution, the FSO link is modeled by a unified Gamma-Gamma turbulence distribution. The FSO link accounts for pointing errors and both types of detection techniques (i.e. heterodyne detection as well as intensity modulation/direct detection (IM/DD)). With this model, a new exact closed-form expression is derived for the outage probability of the end-To-end signal-To-noise ratio of these systems in terms of the Meijer\\'s G function and the Fox\\'s H functions under fixed amplify-and-forward relay scheme. All new analytical results are verified via computer-based Monte-Carlo simulations and are illustrated by some selected numerical results.

  6. Thermomechanical piston pump development

    Science.gov (United States)

    Sabelman, E. E.

    1971-01-01

    A thermally powered reciprocating pump has been devised to replace or augment an electric pump for the transport of temperature-control fluid on the Thermoelectric Outer Planet Spacecraft (TOPS). The thermally powered pump operates cyclically by extracting heat energy from the fluid by means of a vapor-pressure expansion system and by using the heat to perform the mechanical work of pumping. A feasibility test unit has been constructed to provide an output of 7 cu in during a 10- to 100-second cycle. It operates with a fluid input temperature of 200 to 300 F and a heat sink temperature of 0 to 30 F.

  7. Pumps for nuclear industry

    International Nuclear Information System (INIS)

    Tanguy, L.

    1978-01-01

    In order to meet the requirements of nuclear industry for the transfer of corrosive, toxic, humidity sensitive or very pure gases, different types of pumps were developped and commercialized. Their main characteristics are to prevent pollution of the transfered fluid by avoiding any contact between this fluid and the lubricated parts of the machine, and to prevent a contamination of the atmosphere or of the fluid by a total tightness. Patellar pumps have been particularly developped because the metallic bellows are quite reliable and resistant in this configuration. Two types are described: patellar pumps without friction and barrel pumps whose pistons are provided with rings sliding in the cylinders without lubrication [fr

  8. Pump safety device

    International Nuclear Information System (INIS)

    Timmermans, Francis; Vandervorst, Jean.

    1981-01-01

    Safety device for longitudinally leak proofing the shaft of a pump in the event of the fracture of the dynamic seal separating the pump fluid high pressure chamber from the low pressure chamber. It is designed for fitting to the primary pumps of nuclear reactors. It includes a hollow cyclindrical piston located coaxially around the pump shaft and normally housed in a chamber provided for this purpose in the fixed housing of the dynamic seal, and means for moving this piston coaxially so as to compress a safety O ring between the shaft and the piston in the event of the dynamic seal failing [fr

  9. Optically pumped atoms

    CERN Document Server

    Happer, William; Walker, Thad

    2010-01-01

    Covering the most important knowledge on optical pumping of atoms, this ready reference is backed by numerous examples of modelling computation for optical pumped systems. The authors show for the first time that modern scientific computing software makes it practical to analyze the full, multilevel system of optically pumped atoms. To make the discussion less abstract, the authors have illustrated key points with sections of MATLAB codes. To make most effective use of contemporary mathematical software, it is especially useful to analyze optical pumping situations in the Liouville spa

  10. Detection of pump degradation

    International Nuclear Information System (INIS)

    Casada, D.

    1995-01-01

    There are a variety of stressors that can affect the operation of centrifugal pumps. Although these general stressors are active in essentially all centrifugal pumps, the stressor level and the extent of wear and degradation can vary greatly. Parameters that affect the extent of stressor activity are manifold. In order to assure the long-term operational readiness of a pump, it is important to both understand the nature and magnitude of the specific degradation mechanisms and to monitor the performance of the pump. The most commonly applied method of monitoring the condition of not only pumps, but rotating machinery in general, is vibration analysis. Periodic or continuous special vibration analysis is a cornerstone of most pump monitoring programs. In the nuclear industry, non-spectral vibration monitoring of safety-related pumps is performed in accordance with the ASME code. Pump head and flow rate are also monitored, per code requirements. Although vibration analysis has dominated the condition monitoring field for many years, there are other measures that have been historically used to help understand pump condition; advances in historically applied technologies and developing technologies offer improved monitoring capabilities. The capabilities of several technologies (including vibration analysis, dynamic pressure analysis, and motor power analysis) to detect the presence and magnitude of both stressors and resultant degradation are discussed

  11. Champagne Heat Pump

    Science.gov (United States)

    Jones, Jack A.

    2004-01-01

    The term champagne heat pump denotes a developmental heat pump that exploits a cycle of absorption and desorption of carbon dioxide in an alcohol or other organic liquid. Whereas most heat pumps in common use in the United States are energized by mechanical compression, the champagne heat pump is energized by heating. The concept of heat pumps based on other absorption cycles energized by heat has been understood for years, but some of these heat pumps are outlawed in many areas because of the potential hazards posed by leakage of working fluids. For example, in the case of the water/ammonia cycle, there are potential hazards of toxicity and flammability. The organic-liquid/carbon dioxide absorption/desorption cycle of the champagne heat pump is similar to the water/ammonia cycle, but carbon dioxide is nontoxic and environmentally benign, and one can choose an alcohol or other organic liquid that is also relatively nontoxic and environmentally benign. Two candidate nonalcohol organic liquids are isobutyl acetate and amyl acetate. Although alcohols and many other organic liquids are flammable, they present little or no flammability hazard in the champagne heat pump because only the nonflammable carbon dioxide component of the refrigerant mixture is circulated to the evaporator and condenser heat exchangers, which are the only components of the heat pump in direct contact with air in habitable spaces.

  12. Performance of Wind Pump Prototype

    African Journals Online (AJOL)

    Mulu

    Mekelle University, Mekelle, Ethiopia (*mul_at@yahoo.com). ABSTRACT. A wind ... balanced rotor power and reciprocating pump, hence did not consider the effect of pump size. ... Keywords: Wind pump, Windmill, Performance testing, Pump efficiency, Pump discharge, ... Unfortunately, in rural places, where the houses are.

  13. Detection of pump degradation

    International Nuclear Information System (INIS)

    Casada, D.

    1994-01-01

    There are a variety of stressors that can affect the operation of centrifugal pumps. Although these general stressors are active in essentially all centrifugal pumps, the stressor level and the extent of wear and degradation can vary greatly. Parameters that affect the extent of stressor activity are manifold. In order to assure the long-term operational readiness of a pump, it is important to both understand the nature and magnitude of the specific degradation mechanisms and to monitor the performance of the pump. The most commonly applied method of monitoring the condition of not only pumps, but rotating machinery in general, is vibration analysis. Periodic or continuous spectral vibration analysis is a cornerstone of most pump monitoring programs. In the nuclear industry, non-spectral vibration monitoring of safety-related pumps is performed in accordance with the ASME code. Although vibration analysis has dominated the condition monitoring field for many years, there are other measures that have been historically used to help understand pump condition: advances in historically applied technologies and developing technologies offer improved monitoring capabilities. The capabilities of several technologies (including vibration analysis, dynamic pressure analysis, and motor power analysis) to detect the presence and magnitude of both stressors and resultant degradation are discussed

  14. Normetex Pump Alternatives Study

    International Nuclear Information System (INIS)

    Clark, Elliot A.

    2013-01-01

    A mainstay pump for tritium systems, the Normetex scroll pump, is currently unavailable because the Normetex company went out of business. This pump was an all-metal scroll pump that served tritium processing facilities very well. Current tritium system operators are evaluating replacement pumps for the Normetex pump and for general used in tritium service. An all-metal equivalent alternative to the Normetex pump has not yet been identified. 1. The ideal replacement tritium pump would be hermetically sealed and contain no polymer components or oils. Polymers and oils degrade over time when they contact ionizing radiation. 2. Halogenated polymers (containing fluorine, chlorine, or both) and oils are commonly found in pumps. These materials have many properties that surpass those of hydrocarbon-based polymers and oils, including thermal stability (higher operating temperature) and better chemical resistance. Unfortunately, they are less resistant to degradation from ionizing radiation than hydrocarbon-based materials (in general). 3. Polymers and oils can form gaseous, condensable (HF, TF), liquid, and solid species when exposed to ionizing radiation. For example, halogenated polymers form HF and HCl, which are extremely corrosive upon reaction with water. If a pump containing polymers or oils must be used in a tritium system, the system must be designed to be able to process the unwanted by-products. Design features to mitigate degradation products include filters and chemical or physical traps (eg. cold traps, oil traps). 4. Polymer components can work in tritium systems, but must be replaced regularly. Polymer components performance should be monitored or be regularly tested, and regular replacement of components should be viewed as an expected normal event. A radioactive waste stream must be established to dispose of used polymer components and oil with an approved disposal plan developed based on the facility location and its regulators. Polymers have varying

  15. Circulation pump mounting

    International Nuclear Information System (INIS)

    Skalicky, A.

    1976-01-01

    The suspension is described of nuclear reactor circulating pumps enabling their dilatation with a minimum reverse force consisting of spacing rods supported with one end in the anchor joints and provided with springs and screw joints engaging the circulating pump shoes. The spacing rods are equipped with side vibration dampers anchored in the shaft side wall and on the body of the circulating pump drive body. The negative reverse force F of the spacing rods is given by the relation F=Q/l.y, where Q is the weight of the circulating pump, l is the spatial distance between the shoe joints and anchor joints, and y is the deflection of the circulating pump vertical axis from the mean equilibrium position. The described suspension is advantageous in that that the reverse force for the deflection from the mean equilibrium position is minimal, dynamic behaviour is better, and construction costs are lower compared to suspension design used so far. (J.B.)

  16. Outage performance improvement by state of the art reactor stud tensioning

    International Nuclear Information System (INIS)

    Oehler, Horst Werner; Vervliet, Herman

    2006-01-01

    Actual methods of reactor closing, i.e. cover to vessel sealing, is based on the creation of an equal load to the sealing circumference by tensioning all reactor studs with an equal force. This method ensures leak tightness through equal compression of the reactor seal in normal circumstances and is largely applied for all types of reactors throughout many generations and designs of nuclear power stations. The tension generated in each reactor stud is controlled indirectly by measuring the reactor stud elongation while under stress. Most studs are designed to measure this elongation easily by conventional or more advanced systems (from individual clock gauge to integrated digital transmission to a computer screen). It is this elongation value, prescribed by the reactor vessel/cover manufacturer which must be respected and demonstrated during all reactor closing operations, weather they take place for initial hydro testing, refuelling operations or periodical hydraulic tests of the primary circuit. Closing (and re-opening) of reactor vessels has become a routine operation as it is required for fuel reloading of the reactor core. This operation is performed on all PWR and BWR type of reactors with a large variety of tooling. As most of the utilities have implemented maintenance optimisation programs, the refuelling outage is reduced to a sequence of activities that allow quick and efficient refuelling of the core. The performance and efficiency of instrumentation and tooling deployed during these essential activities are of the utmost importance to minimise the critical path of the refuelling outage. Today, in support of outage performance, many utilities have invested in new and refurbished tooling to allow quick and efficient opening and closing of the reactor vessel. The features and properties of the most performing multi stud tensioning machines currently in service in nuclear power stations world wide (Africa, Europe, Asia and USA) are presented in the paper

  17. BWR series pump recirculation system

    International Nuclear Information System (INIS)

    Dillmann, C.W.

    1992-01-01

    This patent describes a recirculation system for driving reactor coolant water contained in an annular downcomer defined between a boiling water reactor vessel and a reactor core spaced radially inwardly therefrom. It comprises a plurality of circumferentially spaced second pumps disposed in the downcomer, each including an inlet for receiving from the downcomer a portion of the coolant water as pump inlet flow, and an outlet for discharging the pump inlet flow pressurized in the second pump as pump outlet flow; and means for increasing pressure of the pump inlet flow at the pump inlet including a first pump disposed in series flow with the second pump for first receiving the pump inlet flow from the downcomer and discharging to the second pump inlet flow pressurized in the first pump

  18. High pressure liquid gas pump

    Science.gov (United States)

    Acres, R. L.

    1972-01-01

    Design and development of two types of pumps for handling liquefied gases are discussed. One pump uses mechanical valve shift and other uses pneumatic valve shift. Illustrations of pumps are provided and detailed description of operation is included.

  19. Understanding the Benefits of Dispersed Grid-Connected Photovoltaics: From Avoiding the Next Major Outage to Taming Wholesale Power Markets

    International Nuclear Information System (INIS)

    Letendre, Steven E.; Perez, Richard

    2006-01-01

    Thanks to new solar resource assessment techniques using cloud cover data available from geostationary satellites, it is apparent that grid-connected PV installations can serve to enhance electric grid reliability, preventing or hastening recovery from major power outages and serving to mitigate extreme price spikes in wholesale energy markets. (author)

  20. Air traffic control : good progress on interim replacement for outage-plagued system, but risks can be further reduced

    Science.gov (United States)

    1996-10-01

    Certain air traffic control(ATC) centers experienced a series of major outages, : some of which were caused by the Display Channel Complex or DCC-a mainframe : computer system that processes radar and other data into displayable images on : controlle...

  1. Outage performance of opportunistic two-way amplify-and-forward relaying with outdated channel state information

    KAUST Repository

    Hwang, Kyusung; Ju, Minchul; Alouini, Mohamed-Slim

    2013-01-01

    In this paper, we study the outage performance of an amplify-and-forward (AF)-based two-way relaying (TWR) system with multiple relays where a single relay selection is performed based on outdated channel state information (CSI). Specifically, we

  2. 47 CFR 4.11 - Notification and initial and final communications outage reports that must be filed by...

    Science.gov (United States)

    2010-10-01

    ... Notification shall provide: The name of the reporting entity; the date and time of onset of the outage; a brief... FEDERAL COMMUNICATIONS COMMISSION GENERAL DISRUPTIONS TO COMMUNICATIONS Reporting Requirements for... and contact telephone number by which the Commission's technical staff may contact the reporting...

  3. Resolving piping analysis issues to minimize impact on installation activities during refueling outage at nuclear power plants

    International Nuclear Information System (INIS)

    Bhavnani, D.

    1996-01-01

    While it is required to maintain piping code compliance for all phases of installation activities during outages at a nuclear plant, it is equally essential to reduce challenges to the installation personnel on how plant modification work should be performed. Plant betterment activities that incorporate proposed design changes are continually implemented during the outages. Supporting analysis are performed to back these activities for operable systems. The goal is to reduce engineering and craft man-hours and minimize outage time. This paper outlines how plant modification process can be streamlined to facilitate construction teams to do their tasks that involve safety related piping. In this manner, installation can proceed by minimizing on the spot analytical effort and reduce downtime to support the proposed modifications. Examples are provided that permit performance of installation work in any sequence. Piping and hangers including the branch lines are prequalified and determined operable. The system is up front analyzed for all possible scenarios. The modification instructions in the work packages is flexible enough to permit any possible installation sequence. The benefit to this approach is large enough in the sense that valuable outage time is not extended and on site analytical work is not required

  4. Evaluation of mean time between forced outage for reactor protection system using RBD and failure rate

    International Nuclear Information System (INIS)

    Lee, D. Y.; Park, J. H.; Hwang, I. K.; Cha, K. H.; Choi, J. K.; Lee, K. Y.; Park, J. K.

    2001-01-01

    The design life of nuclear power plants (NPPs) under recent construction is about fifty to sixty years. However, the duration that equipments of control systems operate without failures is at most five to ten years. Design for diversity and adequate maintenance strategy are required for NPP protection system in order to use the control equipment which has shorter life time than the design life of NPP. Fault Tree Analysis (FTA) technique, which has been applied to Probabilistics Safety Analysis (PSA), has been introduced to quantitatively evaluate the reliability of NPP I and C systems. The FTA, however, cannot properly consider the effect of maintenance. In this work, we have reviewed quantitative reliability evaluation techniques using the reliability block diagram and failure rates and applied it to the evaluation of mean time between forced outage for reactor protection system

  5. A Unified Simulation Approach for the Fast Outage Capacity Evaluation over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.

    2016-01-06

    The outage capacity (OC) is among the most important performance metrics of communication systems over fading channels. The evaluation of the OC, when equal gain combining (EGC) or maximum ratio combining (MRC) diversity techniques are employed, boils down to computing the cumulative distribution function (CDF) of the sum of channel envelopes (equivalently amplitudes) for EGC or channel gains (equivalently squared enveloped/ amplitudes) for MRC. Closed-form expressions of the CDF of the sum of many generalized fading variates are generally unknown and constitute open problems. We develop a unified hazard rate twisting Importance Sampling (IS) based approach to efficiently estimate the CDF of the sum of independent arbitrary variates. The proposed IS estimator is shown to achieve an asymptotic optimality criterion, which clearly guarantees its efficiency. Some selected simulation results are also shown to illustrate the substantial computational gain achieved by the proposed IS scheme over crude Monte Carlo simulations.

  6. Investigation report from the commission for energy regulation about the outage of Saturday November 4, 2006

    International Nuclear Information System (INIS)

    2007-01-01

    On November 4, 2006, a large-scale incident occurred on the European high-voltage interconnected power network which left 15 million people without electricity in Western Europe during about 2 hours. Considering the European dimension of the outage, the European Regulators Group for Electricity and Gas (ERGEG) conducted an investigation, the final report of which being made publically available on February 6, 2007. Considering the impact of this incident on the French territory, the French commission for energy regulation (CRE) decided as soon as November 5, 2006 to carry out its own investigation in order to inform the French consumers about the chronology of facts and the precise causes of this incident. This document summarises the CRE's report and presents its conclusions and recommendations as well as the technical report of the incident

  7. Ratepayers should not fund IP-2 outage, NY Attorney General says

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The New York Attorney General is trying to block Consolidated Edison's effort to pay for an Indian Point nuclear plant outage through the fuel-adjustment clause on the grounds that the utility had repeated system warnings and should have taken action to prevent the leakage of water into the containment building. The utility rejects the assessment of personnel negligence and, blaming equipment failure, plans to replace its heat exchangers. The New York Public Service Commission approved Con Ed's use of the fuel-adjustment clause to pay for replacement power, but agrees that ratepayers should not pay the costs of negligence if the charges are proved. The Attorney General feels that Con Ed could legally challenge a later request for refunds. Other funding possibilities include nuclear-insurance policies or legal action against the equipment manufacturer

  8. A unified simulation approach for the fast outage capacity evaluation over generalized fading channels

    KAUST Repository

    Rached, Nadhir B.

    2015-06-14

    The outage capacity (OC) is among the most important performance metrics of communication systems over fading channels. The evaluation of the OC, when Equal Gain Combining (EGC) or Maximum Ratio Combining (MRC) diversity techniques are employed, boils down to computing the Cumulative Distribution Function (CDF) of the sum of channel envelopes (equivalently amplitudes) for EGC or channel gain (equivalently squared enveloped/amplitudes) for MRC. Closed-form expressions of the CDF of the sum of many generalized fading variates are generally unknown and constitute open problems. In this paper, we develop a unified hazard rate twisting Importance Sampling (IS) based approach to efficiently estimate the CDF of the sum of independent arbitrary variates. The proposed IS estimator is shown to achieve an asymptotic optimality criterion, which clearly guarantees its efficiency. Some selected simulation results are also shown to illustrate the substantial computational gain achieved by the proposed IS scheme over crude Monte-Carlo simulations.

  9. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2011-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  10. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2010-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  11. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2010-07-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  12. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2011-03-15

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  13. Accurate outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel; Yang, Hongchuan; Alouini, Mohamed-Slim

    2011-01-01

    In this paper, we investigate a dual-hop decode-and-forward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. We first derive the exact statistics of received signal-to-noise (SNR) over each hop with co-located relays, in terms of probability density function (PDF). Then, the PDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2011 IEEE.

  14. R and D proposals to improve outages operation. Methods, practices and tools

    International Nuclear Information System (INIS)

    Dionis, Francois

    2014-01-01

    This paper deals with outage operation improvement. It offers a number of tracks on the interactions between the operation activities and maintenance, with a methodological perspective and proposals concerning the Information System. On the methodological point of view, a clever plant systems modeling may allow representing the needed characteristics in order to optimize tagouts, alignment procedures and the schedule. Tools must be taken n into account for new tagout practices such as tags sharing. It is possible to take advantage of 2D drawings integrated into the information system in order to improve the data controls and to visualize operation activities. An integrated set of mobile applications should allow field operators to join the information system for a better and safer performance. (author)

  15. Start-up of Cirus after refurbishment outage and observations during approach to criticality

    International Nuclear Information System (INIS)

    Singh, Tej; Singh, Kanchhi; Sengupta, S.N.

    2004-10-01

    The report presents various physics related aspects of the startup of Cirus reactor after the prolonged refurbishment outage. The special nuclear instrumentation scheme adopted to ensure safe startup of the reactor is described. Salient observations made and physics measurements carried out during various approaches to criticality are covered. One of the significant observations concerned a major reactivity anomaly during the approach to criticality. After due investigations the cause of the anomaly was attributed to the inadvertent wetting of the graphite reflector which houses the reactor regulating and protection system ion chambers. The report also includes salient observations during raising of reactor power to high levels. The wet reflector also resulted in a significant difference measured between the thermal and neutronic power of the reactor. In view of the reactivity anomaly, the core reactivity variation with time was closely followed and compared with computations. As expected the reactivity anomaly reduced gradually with time. (author)

  16. BINARY PARTICLE SWARM OPTIMIZATION APPROACH FOR RANDOM GENERATION OUTAGE MAINTENANCE SCHEDULING

    Directory of Open Access Journals (Sweden)

    K. Suresh

    2013-01-01

    Full Text Available This paper presents a methodology for maintenance scheduling (MS of generators using binary particle swarm optimization (BPSO based probabilistic approach. The objective of this paper is to reduce the loss of load probability (LOLP for a power system. The capacity outage probability table (COPT is the initial step in creating maintenance schedule using the probabilistic levelized risk method. This paper proposes BPSO method which is used to construct the COPT. In order to mitigate the effects of probabilistic levelized risk method, BPSO based probabilistic levelized risk method is embarked on a MS problem. In order to validate the effectiveness of the proposed algorithm, case study results for simple five unit system can accomplish a significant levelization in the reliability indices that make possible to evaluate system generation system adequacy in the MS horizon of the power system. The proposed method shows better performance compared with other optimization methods and conventional method with improved search performance.

  17. Outage probability of dual-hop FSO fixed gain relay transmission systems

    KAUST Repository

    Zedini, Emna

    2016-12-24

    In this paper, we analyze the end-to-end performance of dual-hop free-space optical (FSO) fixed gain relaying systems in the presence of atmospheric turbulence as well as pointing errors. More specifically, an exact closed-form expression for the outage probability is presented in terms of the bivariate Fox\\'s H function that accounts for both heterodyne detection as well as intensity modulation with direct detection. At high signal-to-noise ratio (SNR) regime, we provide very tight asymptotic result for this performance metric in terms of simple elementary functions. By using dual-hop FSO relaying, we demonstrate a better system performance as compared to the single FSO link. Numerical and Monte-Carlo simulation results are provided to verify the accuracy of the newly proposed results, and a perfect agreement is observed.

  18. Accurate outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel

    2011-04-01

    In this paper, we investigate a dual-hop decode-and-forward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. We first derive the exact statistics of received signal-to-noise (SNR) over each hop with co-located relays, in terms of probability density function (PDF). Then, the PDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2011 IEEE.

  19. Scale models: A proven cost-effective tool for outage planning

    Energy Technology Data Exchange (ETDEWEB)

    Lee, R. [Commonwealth Edison Co., Morris, IL (United States); Segroves, R. [Sargent & Lundy, Chicago, IL (United States)

    1995-03-01

    As generation costs for operating nuclear stations have risen, more nuclear utilities have initiated efforts to improve cost effectiveness. Nuclear plant owners are also being challenged with lower radiation exposure limits and new revised radiation protection related regulations (10 CFR 20), which places further stress on their budgets. As source term reduction activities continue to lower radiation fields, reducing the amount of time spent in radiation fields becomes one of the most cost-effective ways of reducing radiation exposure. An effective approach for minimizing time spent in radiation areas is to use a physical scale model for worker orientation planning and monitoring maintenance, modifications, and outage activities. To meet the challenge of continued reduction in the annual cumulative radiation exposures, new cost-effective tools are required. One field-tested and proven tool is the physical scale model.

  20. The power outage of November 4, 2006: a plea for a genuine European energy policy

    International Nuclear Information System (INIS)

    Merlin, Andre

    2006-01-01

    As a power outage affected several millions European people in November 2006, this article identifies and discusses actions to be implemented at the European level to avoid such a situation and thus strengthen energy security for all European citizen. It proposes a detailed analysis of the situation of electricity transport grids before the incident, of what happened in terms of overloads for some very high voltage lines: the de-energizing of a line over the Ems River resulted in a domino triggering off of very high voltage lines connected to different areas of Europe; a decrease of current frequency resulted in the disconnection of power plants and grid managers had to reduce consumption in emergency. The article draws some early lessons of the incident before the UCTE (Power Transport Coordination Union) inquiry, and recommends some actions regarding grid coordination, harmonisation of abilities and decisions, and performance of provisional assessments of the electricity supply/demand balance

  1. Signal Quality Outage Analysis for Ultra-Reliable Communications in Cellular Networks

    DEFF Research Database (Denmark)

    Gerardino, Guillermo Andrés Pocovi; Alvarez, Beatriz Soret; Lauridsen, Mads

    2015-01-01

    Ultra-reliable communications over wireless will open the possibility for a wide range of novel use cases and applications. In cellular networks, achieving reliable communication is challenging due to many factors, particularly the fading of the desired signal and the interference. In this regard......, we investigate the potential of several techniques to combat these main threats. The analysis shows that traditional microscopic multiple-input multiple-output schemes with 2x2 or 4x4 antenna configurations are not enough to fulfil stringent reliability requirements. It is revealed how such antenna...... schemes must be complemented with macroscopic diversity as well as interference management techniques in order to ensure the necessary SINR outage performance. Based on the obtained performance results, it is discussed which of the feasible options fulfilling the ultra-reliable criteria are most promising...

  2. Outage Performance Analysis of Cooperative Diversity with MRC and SC in Correlated Lognormal Channels

    Directory of Open Access Journals (Sweden)

    Skraparlis D

    2009-01-01

    Full Text Available Abstract The study of relaying systems has found renewed interest in the context of cooperative diversity for communication channels suffering from fading. This paper provides analytical expressions for the end-to-end SNR and outage probability of cooperative diversity in correlated lognormal channels, typically found in indoor and specific outdoor environments. The system under consideration utilizes decode-and-forward relaying and Selection Combining or Maximum Ratio Combining at the destination node. The provided expressions are used to evaluate the gains of cooperative diversity compared to noncooperation in correlated lognormal channels, taking into account the spectral and energy efficiency of the protocols and the half-duplex or full-duplex capability of the relay. Our analysis demonstrates that correlation and lognormal variances play a significant role on the performance gain of cooperative diversity against noncooperation.

  3. Pumping machinery theory and practice

    CERN Document Server

    Badr, Hassan M

    2014-01-01

    Pumping Machinery Theory and Practice comprehensively covers the theoretical foundation and applications of pumping machinery. Key features: Covers characteristics of centrifugal pumps, axial flow pumps and displacement pumpsConsiders pumping machinery performance and operational-type problemsCovers advanced topics in pumping machinery including multiphase flow principles, and two and three-phase flow pumping systemsCovers different methods of flow rate control and relevance to machine efficiency and energy consumptionCovers different methods of flow rate control and relevance to machine effi

  4. Unified Importance Sampling Schemes for Efficient Simulation of Outage Capacity over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2015-01-01

    The outage capacity (OC) is among the most important performance metrics of communication systems operating over fading channels. Of interest in the present paper is the evaluation of the OC at the output of the Equal Gain Combining (EGC) and the Maximum Ratio Combining (MRC) receivers. In this case, it can be seen that this problem turns out to be that of computing the Cumulative Distribution Function (CDF) for the sum of independent random variables. Since finding a closedform expression for the CDF of the sum distribution is out of reach for a wide class of commonly used distributions, methods based on Monte Carlo (MC) simulations take pride of price. In order to allow for the estimation of the operating range of small outage probabilities, it is of paramount importance to develop fast and efficient estimation methods as naive Monte Carlo (MC) simulations would require high computational complexity. In this line, we propose in this work two unified, yet efficient, hazard rate twisting Importance Sampling (IS) based approaches that efficiently estimate the OC of MRC or EGC diversity techniques over generalized independent fading channels. The first estimator is shown to possess the asymptotic optimality criterion and applies for arbitrary fading models, whereas the second one achieves the well-desired bounded relative error property for the majority of the well-known fading variates. Moreover, the second estimator is shown to achieve the asymptotic optimality property under the particular Log-normal environment. Some selected simulation results are finally provided in order to illustrate the substantial computational gain achieved by the proposed IS schemes over naive MC simulations.

  5. Limiting the impact of recent outage experience in a midsize university reactor environment

    International Nuclear Information System (INIS)

    Vernetson, W.G.

    1996-01-01

    The University of Florida Training Reactor (UFTR) is a light-water-cooled, graphite- and light-water-moderated, modified Argonaut-type reactor licensed to operate at steady-state power levels up to 100 kW. The UFTR continues to utilize high-enriched materials test reactor-type fuel in a piping circuit type of system versus the more familiar pool reactor design. Though somewhat limited for research and service, the UFTR is a valuable educational facility. Despite its relatively low power level, the two-slab core configuration provides a peak thermal flux near 2 x 10 12 n/cm 2 · s; in addition, other modifications and experimental adaptations have been implemented in the 36-yr history of the facility to enhance the potential of the facility for diverse types of unique educational usage. Its small physical size in a loop configuration makes it a good teaching tool, but it can also be associated with unique maintenance problems, as in this case. The mission of the UFTR is to serve regional needs for access to quality reactor usage in a variety of areas to support educational and training needs as well as research and service, including public information about nuclear energy. As the only nonpower reactor in the state of Florida in affiliation with an established and diverse nuclear and radiological engineering department, it has a strong role to play in education, training, research, and service, especially the former. As a result of its unique position, the facility has been quite successful in its mission. With so much educational usage scheduled, sometimes for classes arriving from 100 miles away, it is important to avoid unexpected outages as well as unexpectedly lengthy outages. Such planning usually is successful and has allowed the RFTR to build a clientele of more than four dozen regular educational users, although events in 1995 could have undetermined this effort

  6. Unified Importance Sampling Schemes for Efficient Simulation of Outage Capacity over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.

    2015-11-13

    The outage capacity (OC) is among the most important performance metrics of communication systems operating over fading channels. Of interest in the present paper is the evaluation of the OC at the output of the Equal Gain Combining (EGC) and the Maximum Ratio Combining (MRC) receivers. In this case, it can be seen that this problem turns out to be that of computing the Cumulative Distribution Function (CDF) for the sum of independent random variables. Since finding a closedform expression for the CDF of the sum distribution is out of reach for a wide class of commonly used distributions, methods based on Monte Carlo (MC) simulations take pride of price. In order to allow for the estimation of the operating range of small outage probabilities, it is of paramount importance to develop fast and efficient estimation methods as naive Monte Carlo (MC) simulations would require high computational complexity. In this line, we propose in this work two unified, yet efficient, hazard rate twisting Importance Sampling (IS) based approaches that efficiently estimate the OC of MRC or EGC diversity techniques over generalized independent fading channels. The first estimator is shown to possess the asymptotic optimality criterion and applies for arbitrary fading models, whereas the second one achieves the well-desired bounded relative error property for the majority of the well-known fading variates. Moreover, the second estimator is shown to achieve the asymptotic optimality property under the particular Log-normal environment. Some selected simulation results are finally provided in order to illustrate the substantial computational gain achieved by the proposed IS schemes over naive MC simulations.

  7. Integrated services as the key to the optimisation of refueling outages

    International Nuclear Information System (INIS)

    Ortega, Juan; Gonzalez, Roberto; Gutierrez, Jose E.

    2010-01-01

    Refueling outages at nuclear power plants are subject to demanding improvement criteria in each and every one of the activities scheduled. The management of activities on the refueling floor, including the phases of opening and closing of the reactor vessel and associated tasks relating to the reactor internals, the unloading, loading and management of the irradiated fuel and activities requested for the in-service inspection of essential primary circuit components, are interventions that have an impact on the refueling critical path and whose overall integration allows for significant optimization of the entire management of this fundamental refueling activity. For several years now, ENUSA, as the company specializing in irradiated fuel services, TECNATOM as the company responsible for the in-service inspection of critical primary side components and Westinghouse as the technology provider and specialist in the supply of plant support services, have together formed a solid working team offering this integrated refueling service to the Spanish plants. Today, the new and heightened demands regarding the training and specialization of the personnel participating in refueling outages, the need to consider contingencies in the activities scheduled and the objectives relating to the ALARA concept and safe operations require that this service include new activities providing synergies and leading to higher levels of commitment to excellence. This paper will present the service model developed, the most significant activities integrated in the service and the advantages and milestones achieved and reached during this period, compared to the conventional distributed functions model. Likewise, an analysis will be made of the new challenges that are being addressed, with a view to bringing about a more global integration. (authors)

  8. Electromagnetic pump technology

    International Nuclear Information System (INIS)

    Prabhakar, R.

    1994-01-01

    Fast Breeder Reactors have an important role to play in our nuclear power programme. Liquid metal sodium is used as the coolant for removing fission heat generated in fast reactors and a distinctive physical property of sodium is its high electrical conductivity. This enables application of electromagnetic (EM) pumps, working on same principle as electric motors, for pumping liquid sodium. Due to its lower efficiency as compared to centrifugal pumps, use of EM pumps has been restricted to reactor auxiliary circuits and experimental facilities. As part of our efforts to manufacture fast reactor components indigenously, work on the development of two types of EM pumps namely flat linear induction pump (FLIP) and annular linear induction pump (ALIP) has been undertaken. Design procedures based on an equivalent circuit approach have been established and results from testing a 5.6 x 10E-3 Cum/s (20 Cum/h) FLIP in a sodium loop were used to validate the procedure. (author). 7 refs., 6 figs

  9. Radio resource management scheme and outage analysis for network-assisted multi-hop D2D communications

    Directory of Open Access Journals (Sweden)

    Leila Melki

    2016-11-01

    Full Text Available In a cellular network it's very difficult to make spectrum resource more efficiently. Device-to-Device (D2D technology enables new service opportunities, and provides high throughput and reliable communication while reducing the base station load. For better total performance, short-range D2D links and cellular links share the same radio resource and the management of interference becomes a crucial task. Here we argue that single-hop D2D technology can be used to further improve cellular networks performance if the key D2D radio resource management algorithms are suitably extended to support multi-hop D2D communications. Aiming to establish a new paradigm for the analysis and design of multi-hop D2D communications, We propose a radio resource allocation for multi-hop D2D routes based on interference avoidance approach in LTE-A networks. On top of that, we investigate the outage probability of D2D communication. We first introduce a new definition of outage probability by considering the maximum distance to be allowable for single-hop transmission. Then we study and analyze the outage performance of a multi-hop D2D route. We derive the general closed form expression of outage probability of the multi-hop D2D routes. The results demonstrate that the D2D radio, sharing the same resources as the cellular network, provide higher capacity compared to pure cellular communication where all the data is transmitted through the base station. They also demonstrate that the new method of calculation of D2D multi hop outage probability has better performance than classical method defined in the literature.

  10. Improving nuclear utility generation capacity, understanding the sources of forced outage and learning how to prevent them

    International Nuclear Information System (INIS)

    Brodeur, D.L.; Todreas, N.E.; Angus, V.T.

    1998-01-01

    MIT and PECO Energy have completed a detailed examination of the sources of forced outages at the Limerick Generating Station (LGS) Boiling Water Reactor Class IV (BWR IV) site over a five year period and contrasted that information to similar BWR IV utilities in the United States over the same period. Each forced outage was attributed to one system and assigned causal codes of equipment versus human factors and failure attributes such as weak design, poor craftsmanship, and worn parts. It was found that fifty four percent of the lost power at LGS was the result of Balance of Plant failures. Industry wide data identifies fifty nine percent of the lost power as attributed to Balance of Plant failures. Balance of Plant systems are those systems not included in the primary and safety related system category. Considering failure causal factors, forty six percent of the lost power at the utility under study was the result of equipment factors such as weak design or worn parts. Significantly, the study showed a high variance between those systems which caused significant forced outage at the two sister LGS units. This demonstrated the infrequent nature of plant forced outages within a given system. This was supported by the observation that dominant systems attributing to forced outage at LGS were not equally represented in industry data. It is suggested that for individual utilities to dramatically improve unit capability factors with regard to Balance of Plant systems, they must learn from industry wide experiences and develop cooperative means of exchanging lessons learned among similarly designed plants and systems. With the broad knowledge base of system failures, current designs must be frequently assessed and altered until each system poses an acceptable level of risk to generation capacity. (author)

  11. James A. FitzPatrick Nuclear Power Plant recirculation pumps vibration system installation and performance since July 7, 1990

    International Nuclear Information System (INIS)

    Lefter, J.

    1992-01-01

    James A. FitzPatrick recirculation pumps are vertical units consisting of General Electric 5,300 hp variable speed motors driving Byron Jackson Pumps. Speed range is from 400 rpm at 20% reactor power to 1,480 rpm at 100% power. Full speed pump output is 42,500 gpm at 530 ft. head. This paper describes the vibration monitoring system. The design of this vibration monitoring system took about five months and was installed during plant refueling outage between February and May 1990. The objectives of this project were as follows: (1) document and assess the mechanical condition of each RRP during plant startup normal operation and shutdown; (2) identify any areas of operation that might be harmful to the unit; (3) perform impact testing of the proximity probe brackets to determine if any bracket resonances existed in the 0 to 20 times operating speed region (0 to 20X); (4) define and recommend Acceptance Regions in the TDM system

  12. Absorption heat pumps

    International Nuclear Information System (INIS)

    Formigoni, C.

    1998-01-01

    A brief description of the difference between a compression and an absorption heat pump is made, and the reasons why absorption systems have spread lately are given. Studies and projects recently started in the field of absorption heat pumps, as well as criteria usually followed in project development are described. An outline (performance targets, basic components) of a project on a water/air absorption heat pump, running on natural gas or LPG, is given. The project was developed by the Robur Group as an evolution of a water absorption refrigerator operating with a water/ammonia solution, which has been on the market for a long time and recently innovated. Finally, a list of the main energy and cost advantages deriving from the use of absorption heat pumps is made [it

  13. Nuclear-pumped lasers

    CERN Document Server

    Prelas, Mark

    2016-01-01

    This book focuses on Nuclear-Pumped Laser (NPL) technology and provides the reader with a fundamental understanding of NPLs, a review of research in the field, and exploration of large scale NPL system design and applications. Early chapters look at the fundamental properties of lasers, nuclear-pumping and nuclear reactions that may be used as drivers for nuclear-pumped lasers. The book goes on to explore the efficient transport of energy from the ionizing radiation to the laser medium and then the operational characteristics of existing nuclear-pumped lasers. Models based on Mathematica, explanations and a tutorial all assist the reader’s understanding of this technology. Later chapters consider the integration of the various systems involved in NPLs and the ways in which they can be used, including beyond the military agenda. As readers will discover, there are significant humanitarian applications for high energy/power lasers, such as deflecting asteroids, space propulsion, power transmission and mining....

  14. Gas fired heat pumps

    International Nuclear Information System (INIS)

    Seifert, M.

    2006-01-01

    The condensing gas boiler is now state of the art and there is no more room for improvement in performance, technically speaking. The next logical step to improve the overall efficiency is to exploit ambient heat in combination with the primary source of energy, natural gas. That means using natural-gas driven heat pumps and gas-fired heat pumps. Based on this, the Swiss Gas Industry decided to set up a practical test programme enjoying a high priority. The aim of the project 'Gas-fired heat pump practical test' is to assess by field tests the characteristics and performance of the foreign serial heat pumps currently on the market and to prepare and promote the introduction on the market place of this sustainable natural-gas technology. (author)

  15. Absorption heat pump system

    Science.gov (United States)

    Grossman, G.

    1982-06-16

    The efficiency of an absorption heat pump system is improved by conducting liquid from a second stage evaporator thereof to an auxiliary heat exchanger positioned downstream of a primary heat exchanger in the desorber of the system.

  16. Regenerative Hydride Heat Pump

    Science.gov (United States)

    Jones, Jack A.

    1992-01-01

    Hydride heat pump features regenerative heating and single circulation loop. Counterflow heat exchangers accommodate different temperatures of FeTi and LaNi4.7Al0.3 subloops. Heating scheme increases efficiency.

  17. Pressurized Vessel Slurry Pumping

    International Nuclear Information System (INIS)

    Pound, C.R.

    2001-01-01

    This report summarizes testing of an alternate ''pressurized vessel slurry pumping'' apparatus. The principle is similar to rural domestic water systems and ''acid eggs'' used in chemical laboratories in that material is extruded by displacement with compressed air

  18. Mechanical vaccum pumps

    CERN Document Server

    Chew, A D

    2007-01-01

    This presentation gives an overview of the technology of contemporary primary and secondary mechanical vacuum pumps. For reference a brief history of vacuum and a summary of important and basic vacuum concepts are first presented.

  19. High Voltage Charge Pump

    KAUST Repository

    Emira, Ahmed A.; Abdelghany, Mohamed A.; Elsayed, Mohannad Yomn; Elshurafa, Amro M; Salama, Khaled N.

    2014-01-01

    Various embodiments of a high voltage charge pump are described. One embodiment is a charge pump circuit that comprises a plurality of switching stages each including a clock input, a clock input inverse, a clock output, and a clock output inverse. The circuit further comprises a plurality of pumping capacitors, wherein one or more pumping capacitors are coupled to a corresponding switching stage. The circuit also comprises a maximum selection circuit coupled to a last switching stage among the plurality of switching stages, the maximum selection circuit configured to filter noise on the output clock and the output clock inverse of the last switching stage, the maximum selection circuit further configured to generate a DC output voltage based on the output clock and the output clock inverse of the last switching stage.

  20. High Voltage Charge Pump

    KAUST Repository

    Emira, Ahmed A.

    2014-10-09

    Various embodiments of a high voltage charge pump are described. One embodiment is a charge pump circuit that comprises a plurality of switching stages each including a clock input, a clock input inverse, a clock output, and a clock output inverse. The circuit further comprises a plurality of pumping capacitors, wherein one or more pumping capacitors are coupled to a corresponding switching stage. The circuit also comprises a maximum selection circuit coupled to a last switching stage among the plurality of switching stages, the maximum selection circuit configured to filter noise on the output clock and the output clock inverse of the last switching stage, the maximum selection circuit further configured to generate a DC output voltage based on the output clock and the output clock inverse of the last switching stage.

  1. GAS METERING PUMP

    Science.gov (United States)

    George, C.M.

    1957-12-31

    A liquid piston gas pump is described, capable of pumping minute amounts of gas in accurately measurable quantities. The pump consists of a flanged cylindrical regulating chamber and a mercury filled bellows. Sealed to the ABSTRACTS regulating chamber is a value and having a gas inlet and outlet, the inlet being connected by a helical channel to the bellows. A gravity check valve is in the gas outlet, so the gas passes through the inlet and the helical channel to the bellows where the pumping action as well as the metering is accomplished by the actuation of the mercury filled bellows. The gas then flows through the check valve and outlet to any associated apparatus.

  2. JET pump limiter

    International Nuclear Information System (INIS)

    Sonnenberg, K.; Deksnis, E.; Shaw, R.; Reiter, D.

    1988-01-01

    JET plans to install two pump limiter modules which can be used for belt-limiter, inner-wall and X-point discharges and, also, for 1-2s as the main limiter. A design is presented which is compatible with two diagnostic systems, and which allows partial removal of the pump limiter to provide access for remote-handling operations. The high heat-flux components are initially cooled during a pulse. Heat is removed between discharges by radiation and pressure contacts to a water-cooled support structure. The pumping edge will be made of annealed pyrolytic graphite. Exhaust efficiency has been estimated, for a 1-d edge model, using a Monte-Carlo calculation of neutral gas transport. When the pump limiter is operated together with other wall components we expect an efficiency of ≅ 5% (2.5 x 10 21 part/s). As a main limiter the efficiency increases to about 10%. (author)

  3. Types of Breast Pumps

    Science.gov (United States)

    ... called a bicycle horn pump, consists of a hollow rubber ball attached to a breast-shield. Some ... and Drug Administration 10903 New Hampshire Avenue Silver Spring, MD 20993 1-888-INFO-FDA (1-888- ...

  4. Design of Reactor Coolant Pump Seal Online Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Ah, Sang Ha; Chang, Soon Heung [KAIST, Daejeon (Korea, Republic of); Lee, Song Kyu [Korea Power Engineering Co., Yongin (Korea, Republic of)

    2008-05-15

    As a part of a Department of Korea Power Engineering Co., (KOPEC) Project, Statistical Quality Control techniques have been applied to many aspects of industrial engineering. An application to nuclear power plant maintenance and control is also presented that can greatly improve plant safety. As a demonstration of such an approach, a specific system is analyzed: the reactor coolant pumps (RCPs) and the fouling resistance of heat exchanger. This research uses Shewart X-bar, R charts, Cumulative Sum charts (CUSUM), and Sequential Probability Ratio Test (SPRT) to analyze the process for the state of statistical control. And the Control Chart Analyzer (CCA) has been made to support these analyses that can make a decision of error in process. The analysis shows that statistical process control methods can be applied as an early warning system capable of identifying significant equipment problems well in advance of traditional control room alarm indicators. Such a system would provide operators with enough time to respond to possible emergency situations and thus improve plant safety and reliability. RCP circulates reactor coolant to transfer heat from the reactor to the steam generators. RCP seals are in the pressure part of reactor coolant system, so if it breaks, it can cause small break LOCA. And they are running on high pressure, and high temperature, so they can be easily broken. Since the reactor coolant pumps operate within the containment building, physical access to the pumps occurs only during refueling outages. Engineers depend on process variables transmitted to the control room and through the station's data historian to assess the pumps' condition during normal operation.

  5. Design of Reactor Coolant Pump Seal Online Monitoring System

    International Nuclear Information System (INIS)

    Ah, Sang Ha; Chang, Soon Heung; Lee, Song Kyu

    2008-01-01

    As a part of a Department of Korea Power Engineering Co., (KOPEC) Project, Statistical Quality Control techniques have been applied to many aspects of industrial engineering. An application to nuclear power plant maintenance and control is also presented that can greatly improve plant safety. As a demonstration of such an approach, a specific system is analyzed: the reactor coolant pumps (RCPs) and the fouling resistance of heat exchanger. This research uses Shewart X-bar, R charts, Cumulative Sum charts (CUSUM), and Sequential Probability Ratio Test (SPRT) to analyze the process for the state of statistical control. And the Control Chart Analyzer (CCA) has been made to support these analyses that can make a decision of error in process. The analysis shows that statistical process control methods can be applied as an early warning system capable of identifying significant equipment problems well in advance of traditional control room alarm indicators. Such a system would provide operators with enough time to respond to possible emergency situations and thus improve plant safety and reliability. RCP circulates reactor coolant to transfer heat from the reactor to the steam generators. RCP seals are in the pressure part of reactor coolant system, so if it breaks, it can cause small break LOCA. And they are running on high pressure, and high temperature, so they can be easily broken. Since the reactor coolant pumps operate within the containment building, physical access to the pumps occurs only during refueling outages. Engineers depend on process variables transmitted to the control room and through the station's data historian to assess the pumps' condition during normal operation

  6. Optically pumped laser systems

    International Nuclear Information System (INIS)

    DeMaria, A.J.; Mack, M.E.

    1975-01-01

    Laser systems which are pumped by an electric discharge formed in a gas are disclosed. The discharge is in the form of a vortex stabilized electric arc which is triggered with an auxiliary energy source. At high enough repetition rates residual ionization between successive pulses contributes to the pulse stabilization. The arc and the gain medium are positioned inside an optical pumping cavity where light from the arc is coupled directly into the gain medium

  7. Lunar Base Heat Pump

    Science.gov (United States)

    Walker, D.; Fischbach, D.; Tetreault, R.

    1996-01-01

    The objective of this project was to investigate the feasibility of constructing a heat pump suitable for use as a heat rejection device in applications such as a lunar base. In this situation, direct heat rejection through the use of radiators is not possible at a temperature suitable for lde support systems. Initial analysis of a heat pump of this type called for a temperature lift of approximately 378 deg. K, which is considerably higher than is commonly called for in HVAC and refrigeration applications where heat pumps are most often employed. Also because of the variation of the rejection temperature (from 100 to 381 deg. K), extreme flexibility in the configuration and operation of the heat pump is required. A three-stage compression cycle using a refrigerant such as CFC-11 or HCFC-123 was formulated with operation possible with one, two or three stages of compression. Also, to meet the redundancy requirements, compression was divided up over multiple compressors in each stage. A control scheme was devised that allowed these multiple compressors to be operated as required so that the heat pump could perform with variable heat loads and rejection conditions. A prototype heat pump was designed and constructed to investigate the key elements of the high-lift heat pump concept. Control software was written and implemented in the prototype to allow fully automatic operation. The heat pump was capable of operation over a wide range of rejection temperatures and cooling loads, while maintaining cooling water temperature well within the required specification of 40 deg. C +/- 1.7 deg. C. This performance was verified through testing.

  8. Resorption heat pump

    International Nuclear Information System (INIS)

    Vasiliev, L.L.; Mishkinis, D.A.; Antukh, A.A.; Kulakov, A.G.; Vasiliev, L.L.

    2004-01-01

    Resorption processes are based on at least two solid-sorption reactors application. The most favorable situation for the resorption heat pumps is the case, when the presence of a liquid phase is impossible. From simple case--two reactors with two salts to complicated system with two salts + active carbon fiber (fabric) and two branch of the heat pump acting out of phase to produce heat and cold simultaneously, this is the topic of this research program

  9. Portable photovoltaic irrigation pumps

    Energy Technology Data Exchange (ETDEWEB)

    Furber, J. D.

    1980-07-01

    Experiences in developing a solar-powered irrigation pump to meet the needs of poor farmers in developing nations are summarized. The design which evolved is small and portable, employing a high-efficiency electric pump, powered by photovoltaic panels. Particular emphasis is placed on how the system works, and on early field problems experienced with the first prototypes. The resolution of these problems and the performance of actual systems in various countries is presented and user responses are noted.

  10. Tokamak pump limiters

    International Nuclear Information System (INIS)

    Conn, R.W.

    1984-05-01

    Recent experiments with a scoop limiter without active internal pumping have been carried out in the PDX tokamak with up to 6MW of auxiliary neutral beam heating. Experiments have also been done with a rotating head pump limiter in the PLT tokamak in conjunction with RF plasma heating. Extensive experiments have been done in the ISX-B tokamak and first experiments have been completed with the ALT-I limiter in TEXTOR. The pump limiter modules in these latter two machines have internal getter pumping. Experiments in ISX-B are with ohmic and auxiliary neutral beam heating. The results in ISX-B and TEXTOR show that active density control and particle removal is achieved with pump limiters. In ISX-B, the boundary layer (or scape-off layer) plasma partially screens the core plasma from gas injection. In both ISX-B and TEXTOR, the pressure internal to the module scales linearly with plasma density but in ISX-B, with neutral beam injection, a nonlinear increase is observed at the highest densities studied. Plasma plugging is the suspected cause. Results from PDX suggest that a region may exist in which core plasma energy confinement improves using a pump limiter during neutral beam injection. Asymmetric radial profiles and an increased edge electron temperature are observed in discharges with improved confinement. The injection of small amounts of neon into ISX-B has more clearly shown an improved electron core energy confinement during neutral beam injection. While carried out with a regular limiter, this Z-mode of operation is ideal for use with pump limiters and should be a way to achieve energy confinement times similar to values for H-mode tokamak plasmas. The implication of all these results for the design of a reactor pump limiter is described

  11. Tokamak pump limiters

    International Nuclear Information System (INIS)

    Conn, R.W.; California Univ., Los Angeles

    1984-01-01

    Recent experiments with a scoop limiter without active internal pumping have been carried out in the PDX tokamak with up to 6 MW of auxiliary neutral beam heating. Experiments have also been performed with a rotating head pump limiter in the PLT tokamak in conjunction with RF plasma heating. Extensive experiments have been done in the ISX-B tokamak and first experiments have been completed with the ALT-I limiter in TEXTOR. The pump limiter modules in these latter two machines have internal getter pumping. Experiments in ISX-B are with ohmic and auxiliary neutral beam heating. The results in ISX-B and TEXTOR show that active density control and particle removal is achieved with pump limiters. In ISX-B, the boundary layer (or scrape-off layer) plasma partially screens the core plasma from gas injection. In both ISX-B and TEXTOR, the pressure internal to the module scales linearly with plasma density but in ISX-B, with neutral beam injection, a nonlinear increase is observed at the highest densities studied. Plasma plugging is the suspected cause. Results from PDX suggest that a regime may exist in which core plasma energy confinement improves using a pump limiter during neutral beam injection. Asymmetric radial profiles and an increased edge electron temperature are observed in discharges with improved confinement. The injection of small amounts of neon into ISX-B has more clearly shown an improved electron core energy confinement during neutral beam injection. While carried out with a regular limiter, this 'Z-mode' of operation is ideal for use with pump limiters and should be a way to achieve energy confinement times similar to values for H-mode tokamak plasmas. The implication of all these results for the design of a reactor pump limiter is described. (orig.)

  12. Energy efficiency in pumps

    Energy Technology Data Exchange (ETDEWEB)

    Kaya, Durmus; Yagmur, E. Alptekin [TUBITAK-MRC, P.O. Box 21, 41470 Gebze, Kocaeli (Turkey); Yigit, K. Suleyman; Eren, A. Salih; Celik, Cenk [Engineering Faculty, Kocaeli University, Kocaeli (Turkey); Kilic, Fatma Canka [Department of Air Conditioning and Refrigeration, Kocaeli University, Kullar, Kocaeli (Turkey)

    2008-06-15

    In this paper, ''energy efficiency'' studies, done in a big industrial facility's pumps, are reported. For this purpose; the flow rate, pressure and temperature have been measured for each pump in different operating conditions and at maximum load. In addition, the electrical power drawn by the electric motor has been measured. The efficiencies of the existing pumps and electric motor have been calculated by using the measured data. Potential energy saving opportunities have been studied by taking into account the results of the calculations for each pump and electric motor. As a conclusion, improvements should be made each system. The required investment costs for these improvements have been determined, and simple payback periods have been calculated. The main energy saving opportunities result from: replacements of the existing low efficiency pumps, maintenance of the pumps whose efficiencies start to decline at certain range, replacements of high power electric motors with electric motors that have suitable power, usage of high efficiency electric motors and elimination of cavitation problems. (author)

  13. Energy efficiency in pumps

    International Nuclear Information System (INIS)

    Kaya, Durmus; Yagmur, E. Alptekin; Yigit, K. Suleyman; Kilic, Fatma Canka; Eren, A. Salih; Celik, Cenk

    2008-01-01

    In this paper, 'energy efficiency' studies, done in a big industrial facility's pumps, are reported. For this purpose; the flow rate, pressure and temperature have been measured for each pump in different operating conditions and at maximum load. In addition, the electrical power drawn by the electric motor has been measured. The efficiencies of the existing pumps and electric motor have been calculated by using the measured data. Potential energy saving opportunities have been studied by taking into account the results of the calculations for each pump and electric motor. As a conclusion, improvements should be made each system. The required investment costs for these improvements have been determined, and simple payback periods have been calculated. The main energy saving opportunities result from: replacements of the existing low efficiency pumps, maintenance of the pumps whose efficiencies start to decline at certain range, replacements of high power electric motors with electric motors that have suitable power, usage of high efficiency electric motors and elimination of cavitation problems

  14. Pump trials for charged liquids

    International Nuclear Information System (INIS)

    Moroni, J.C.; Niver, A.

    1964-01-01

    The pumps intended for the circulation of charged and radioactive liquids have particular qualities. The choice of such a pump has called for endurance tests with various types of equipment: a Goodyear volumetric screw pumps, and RICHIER, Klein and SCHABAVER centrifugal pumps. The latter, fitted with a special oakum, gave the best results. (authors) [fr

  15. BIOMATERIALS FOR ROTARY BLOOD PUMPS

    NARCIS (Netherlands)

    VANOEVEREN, W

    Rotary blood pumps are used for cardiac assist and cardiopulmonary support since mechanical blood damage is less than with conventional roller pumps. The high shear rate in the rotary pump and the reduced anticoagulation of the patient during prolonged pumping enforces high demands on the

  16. Retrofit of AECL CAN6 seals into the Pickering shutdown cooling pumps

    International Nuclear Information System (INIS)

    Rhodes, D.; Metcalfe, R.; Brown, G.

    1997-01-01

    The existing mechanical seals in the shutdown cooling (SDC) pumps at the eight-unit Pickering Nuclear Generating Station have caused as least seven forced outages in the last fifteen years. The SDC pumps were originally intended to run only during shutdowns, mostly at low pressure, except for short periods during routine testing of SDC isolation valves while the plant is operating at full pressure to verify that the emergency core injection system is available. Unfortunately, in practice, some SDC pumps must be run much more frequently than this to prevent overheating or freezing of components in the system while the plant is at power. This more severe service has decreased seal lifetime from about 8000 running hours to about 3000 running hours. Rather than tackling the difficult task of eliminating on-power running of the pumps, Pickering decided to install a more robust seal design that could withstand this. Through the process of competitive tender, AECL's CAN6 seal was chosen. This seal has a successful history in similarly demanding conditions in boiling water reactors in the USA. To supplement this and demonstrate there would be no 'surprises,' a 2000-hour test program was conducted. Testing consisted of simulating all the expected conditions, plus some special tests under abnormal conditions. This has given assurance that the seal will operate reliably in the Pickering shutdown cooling pumps. (author)

  17. Retrofit of AECL CAN6 seals into the Pickering shutdown cooling pumps

    International Nuclear Information System (INIS)

    Rhodes, D.; Metcalfe, R.; Brown, G.; Kiameh, P.; Burchett, P.

    1997-01-01

    The existing mechanical seals in the shutdown cooling (SDC) pumps at the eight-unit Pickering Nuclear Generating Station have caused at least seven forced outages in the last fifteen years. The SDC pumps were originally intended to run only during shutdowns, mostly at low pressure, except for short periods during routine testing of SDC isolation valves while the plant is operating at full pressure to verify that the emergency core injection system is available. Unfortunately, in practice, some SDC pumps must be run much more frequently than this to prevent overheating or freezing of components in the system while the plant is at power. This more severe service has decreased seal lifetime from about 8000 running hours to about 3000 running hours. Rather than tackling the difficult task of eliminating on-power running of the pumps, Pickering decided to install a more robust seal design that could withstand this. Through the process of competitive tender, AECL's CAN6 seal was chosen. This seal has a successful history in similarly demanding conditions in boiling water reactors in the USA. To supplement this and demonstrate there would be no 'surprises,' a 2000-hour test program was conducted. Testing consisted of simulating all the expected conditions, plus some special tests under abnormal conditions. This has given assurance that the seal will operate reliably in the Pickering shutdown cooling pumps. (author)

  18. Pumps in nuclear power plants

    International Nuclear Information System (INIS)

    Kim, J.H.

    1991-01-01

    This paper reports that pumps play an important role in nuclear plant operation. For instance, reactor coolant pumps (RCPs) should provide adequate cooling for reactor core in both normal operation and transient or accident conditions. Pumps such as Low Pressure Safety Injection (LPSI) pump in the Emergency Core Cooling System (ECCS) play a crucial role during an accident, and their reliability is of paramount importance. Some key issues involved with pumps in nuclear plant system include the performance of RCP under two-phase flow conditions, piping vibration due to pump operating in two-phase flows, and reliability of LPSI pumps

  19. Inservice testing of vertical pumps

    International Nuclear Information System (INIS)

    Cornman, R.E. Jr.; Schumann, K.E.

    1994-01-01

    This paper focuses on the problems that may occur with vertical pumps while inservice tests are conducted in accordance with existing American Society of Mechanical Engineers Code, Section XI, standards. The vertical pump types discussed include single stage, multistage, free surface, and canned mixed flow pumps. Primary emphasis is placed on the hydraulic performance of the pump and the internal and external factors to the pump that impact hydraulic performance. In addition, the paper considers the mechanical design features that can affect the mechanical performance of vertical pumps. The conclusion shows how two recommended changes in the Code standards may increase the quality of the pump's operational readiness assessment during its service life

  20. Thermally Actuated Hydraulic Pumps

    Science.gov (United States)

    Jones, Jack; Ross, Ronald; Chao, Yi

    2008-01-01

    Thermally actuated hydraulic pumps have been proposed for diverse applications in which direct electrical or mechanical actuation is undesirable and the relative slowness of thermal actuation can be tolerated. The proposed pumps would not contain any sliding (wearing) parts in their compressors and, hence, could have long operational lifetimes. The basic principle of a pump according to the proposal is to utilize the thermal expansion and contraction of a wax or other phase-change material in contact with a hydraulic fluid in a rigid chamber. Heating the chamber and its contents from below to above the melting temperature of the phase-change material would cause the material to expand significantly, thus causing a substantial increase in hydraulic pressure and/or a substantial displacement of hydraulic fluid out of the chamber. Similarly, cooling the chamber and its contents from above to below the melting temperature of the phase-change material would cause the material to contract significantly, thus causing a substantial decrease in hydraulic pressure and/or a substantial displacement of hydraulic fluid into the chamber. The displacement of the hydraulic fluid could be used to drive a piston. The figure illustrates a simple example of a hydraulic jack driven by a thermally actuated hydraulic pump. The pump chamber would be a cylinder containing encapsulated wax pellets and containing radial fins to facilitate transfer of heat to and from the wax. The plastic encapsulation would serve as an oil/wax barrier and the remaining interior space could be filled with hydraulic oil. A filter would retain the encapsulated wax particles in the pump chamber while allowing the hydraulic oil to flow into and out of the chamber. In one important class of potential applications, thermally actuated hydraulic pumps, exploiting vertical ocean temperature gradients for heating and cooling as needed, would be used to vary hydraulic pressures to control buoyancy in undersea research

  1. Innovation to reality for improved pump seal performance

    International Nuclear Information System (INIS)

    Wong, W.; Eyvindson, A.; Rhodes, D.B.

    2003-01-01

    'Full-Text:' The nuclear industry requires reliable pump seals. Extended operating conditions for aging plants (i.e., low pressure starts, pressure and temperature transients) and increasing demands from new plants (larger sizes, higher speeds) are pushing the operating envelope for seals. This means that many seals that were previously considered adequate are now requiring increased attention and care. Operating utilities have taken different approaches to addressing their existing, or emerging, seal problems. Primary concerns include maintenance practices, seal design, and monitoring capabilities, as well as operating conditions, transients, pump and motor design. Success in this area requires ongoing dialogue among the station operators, pump manufacturers and seal designers. Regardless of the design, the basic requirement in CANDU is a reliable seal lifetime exceeding 5 years. This paper describes AECL's efforts to meet this requirement through an ongoing program of research and development in seal technology. Current work includes rigorous testing and evaluation of new seal materials and coatings to maximize seal stability and minimize friction and wear (i.e., pressure/temperature transients produce unpredictable shaft movement that can significantly alter face deflections affecting leak rates and seal stability, and sometimes cause the seal to hang-up and de-stage). Also required is a practical method for on-line monitoring of the condition of the seal, whether it is newly installed or after several years of reliable performance. This provides crucial information for inventory, maintenance and outage planning. While new concepts may look good on paper, it is only after they have been demonstrated under fully representative station operating conditions that they can truly be considered ready for field use. AECL CAN-seals lead the nuclear industry in reliability and seal life. They effectively save operators millions of dollars in outage time and person

  2. ITER - torus vacuum pumping system remote handling issues

    International Nuclear Information System (INIS)

    Stringer, J.

    1992-11-01

    This report describes design issues concerning remote maintenance of the ITER torus vacuum pumping system. Key issues under investigation in this report are bearings for inert gas operation, transporter integration options, cryopump access, gate valve maintenance frequency, tritium effects on materials, turbomolecular pump design, and remote maintenance. Alternative bearing materials are explored for inert gas operation. Encapsulated motors and rotary feedthroughs offer an alternative option where space requirements are restrictive. A number of transporter options are studied. The preferred scheme depends on the shielded reconfigured ducts to prevent streaming and activation of RH (remote handling) equipment. A radiation mapping of the cell is required to evaluate this concept. Valve seal and bellow life are critical issues and need to be evaluated, as they have a direct bearing on the provision of adequate RH equipment to meet scheduled and unscheduled maintenance outages. The limited space on the inboard side of the cryopumps for RH equipment access requires a reconfigured duct and manifold. A modified shielded duct arrangement is proposed, which would provide more access space, reduced activation of components, and the potential for improved valve seal life. Work at Mound Laboratories has shown the adverse effects of tritium on some bearing lubricants. Silicone-based lubricants should be avoided. (11 refs., 2 tabs., 31 figs.)

  3. Heat driven pulse pump

    Science.gov (United States)

    Benner, Steve M (Inventor); Martins, Mario S. (Inventor)

    2000-01-01

    A heat driven pulse pump includes a chamber having an inlet port, an outlet port, two check valves, a wick, and a heater. The chamber may include a plurality of grooves inside wall of the chamber. When heated within the chamber, a liquid to be pumped vaporizes and creates pressure head that expels the liquid through the outlet port. As liquid separating means, the wick, disposed within the chamber, is to allow, when saturated with the liquid, the passage of only liquid being forced by the pressure head in the chamber, preventing the vapor from exiting from the chamber through the outlet port. A plurality of grooves along the inside surface wall of the chamber can sustain the liquid, which is amount enough to produce vapor for the pressure head in the chamber. With only two simple moving parts, two check valves, the heat driven pulse pump can effectively function over the long lifetimes without maintenance or replacement. For continuous flow of the liquid to be pumped a plurality of pumps may be connected in parallel.

  4. Using Rapid Improvement Events for Disaster After-Action Reviews: Experience in a Hospital Information Technology Outage and Response.

    Science.gov (United States)

    Little, Charles M; McStay, Christopher; Oeth, Justin; Koehler, April; Bookman, Kelly

    2018-02-01

    The use of after-action reviews (AARs) following major emergency events, such as a disaster, is common and mandated for hospitals and similar organizations. There is a recurrent challenge of identified problems not being resolved and repeated in subsequent events. A process improvement technique called a rapid improvement event (RIE) was used to conduct an AAR following a complete information technology (IT) outage at a large urban hospital. Using RIE methodology to conduct the AAR allowed for the rapid development and implementation of major process improvements to prepare for future IT downtime events. Thus, process improvement methodology, particularly the RIE, is suited for conducting AARs following disasters and holds promise for improving outcomes in emergency management. Little CM , McStay C , Oeth J , Koehler A , Bookman K . Using rapid improvement events for disaster after-action reviews: experience in a hospital information technology outage and response. Prehosp Disaster Med. 2018;33(1):98-100.

  5. Exact Outage Probability of Dual-Hop CSI-Assisted AF Relaying Over Nakagami-m Fading Channels

    KAUST Repository

    Xia, Minghua

    2012-10-01

    In this correspondence, considering dual-hop channel state information (CSI)-assisted amplify-and-forward (AF) relaying over Nakagami- m fading channels, the cumulative distribution function (CDF) of the end-to-end signal-to-noise ratio (SNR) is derived. In particular, when the fading shape factors m1 and m2 at consecutive hops take non-integer values, the bivariate H-function and G -function are exploited to obtain an exact analytical expression for the CDF. The obtained CDF is then applied to evaluate the outage performance of the system under study. The analytical results of outage probability coincide exactly with Monte-Carlo simulation results and outperform the previously reported upper bounds in the low and medium SNR regions.

  6. Wet motor geroter fuel pump

    Energy Technology Data Exchange (ETDEWEB)

    Wiernicki, M.V.

    1987-05-05

    This patent describes a wet motor gerotor fuel pump for pumping fuel from a fuel source to an internal combustion which consists of: gerotor pump means comprising an inner pump gear, an outer pump gear, and second tang means located on one of the inner and outer pump gears. The second tang means further extends in a second radial direction radially offset from the first radial direction and forms a driving connection with the first tang means such that the fuel pump pumps fuel from the fuel source into the narrow conduit inlet chamber, through the gerotor pump means past the electric motor means into the outlet housing means substantially along the flow axis to the internal combustion engine.

  7. On the Efficient Simulation of the Distribution of the Sum of Gamma-Gamma Variates with Application to the Outage Probability Evaluation Over Fading Channels

    KAUST Repository

    Ben Issaid, Chaouki; Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    the outage probability achieved by some diversity techniques over this kind of channels is of major practical importance. In many circumstances, this is related to the difficult question of analyzing the statistics of a sum of Gamma- Gamma random variables

  8. Fusion reactor pumped laser

    International Nuclear Information System (INIS)

    Jassby, D.L.

    1988-01-01

    A nuclear pumped laser is described comprising: a toroidal fusion reactor, the reactor generating energetic neutrons; an annular gas cell disposed around the outer periphery of the reactor, the cell including an annular reflecting mirror disposed at the bottom of the cell and an annular output window disposed at the top of the cell; a gas lasing medium disposed within the annular cell for generating output laser radiation; neutron reflector material means disposed around the annular cell for reflecting neutrons incident thereon back into the gas cell; neutron moderator material means disposed between the reactor and the gas cell and between the gas cell and the neutron reflector material for moderating the energy of energetic neutrons from the reactor; converting means for converting energy from the moderated neutrons to energy pumping means for pumping the gas lasing medium; and beam compactor means for receiving output laser radiation from the annular output window and generating a single output laser beam therefrom

  9. Methodology if inspections to carry out the nuclear outages model; Metodologia de inspeccciones para cumplir el modelo de paradas nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Aycart, J.; Mortenson, S.; Fourquet, J. M.

    2005-07-01

    Before the nuclear generation industry was deregulated in the United States, refueling and maintenance outages in nuclear power plants usually lasted orotund 100 days. After deregulation took effect, improved capability factors and performances became more important. As a result, it became essential to reduce the critical path time during the outage, which meant that activities that had typically been done in series had to be executed in parallel. The new outage model required the development of new tools and new processes, The 360-degree platform developed by GE Energy has made it possible to execute multiple activities in parallel. Various in-vessel visual inspection (IVVI) equipments can now simultaneously perform inspections on the pressurized reactor vessel (RPV) components. The larger number of inspection equipments in turn results in a larger volume of data, with the risk of increasing the time needed for examining them and postponing the end of the analysis phase, which is critical for the outage. To decrease data analysis times, the IVVI Digitalisation process has been development. With this process, the IVVI data are sent via a high-speed transmission line to a site outside the Plant called Center of Excellence (COE), where a team of Level III experts is in charge of analyzing them. The tools for the different product lines are being developed to interfere with each other as little as possible, thus minimizing the impact of the critical path on plant refueling activities. Methods are also being developed to increase the intervals between inspection. In accordance with the guidelines of the Boiling Water Reactor Vessel and Internals project (BWRVIP), the intervals between inspections are typically longer if ultrasound volumetric inspections are performed than if the scope is limited to IVVI. (Author)

  10. Intermediate report of MoReMo. Modelling resilience for maintenance and outage

    Energy Technology Data Exchange (ETDEWEB)

    Oedewald, P.; Macchi, L. (VTT Technical Research Centre of Finland (Finland)); Axelsson, C. (Ringhals AB, Vattenfall AB (Sweden)); Eitrheim, M.H.R. (Institute for Energy Technology (Norway))

    2012-02-15

    Resilience Engineering (RE) is a new approach to safety that helps organisations and individuals adapt to unforeseen events and long-term changes. Such an approach is needed by nuclear power plants (NPPs) as they face demanding modification projects, high staff turnover and increased pressures to maintain and improve safety. The goal of the Modelling Resilience for Maintenance and Outage (MoReMO) project is to develop and test models and methods to identify and analyse resilience in safety-critical activities in natural everyday settings. In 2011, we have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. The project has collected data through observations, interviews and document reviews at two NPPs. Together, the four approaches have provided valuable insights for understanding the rationale behind work practices, their effects on safety, and the support of flexibility and adaptability. In 2012, the MoReMO project will complete the data collection and integrate results on how resilience can be operationalized in practical safety management tools for the companies. (Author)

  11. A study on assessment methodology of surveillance test interval and Allowed Outage Time

    International Nuclear Information System (INIS)

    Che, Moo Seong; Cheong, Chang Hyeon; Ryu, Yeong Woo; Cho, Jae Seon; Heo, Chang Wook; Kim, Do Hyeong; Kim, Joo Yeol; Kim, Yun Ik; Yang, Hei Chang

    1997-07-01

    Objectives of this study is the development of methodology by which assesses the optimization of Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korean nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches are performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method. In the second year of this study, the sensitivity analyses about the failure factors of the components are performed in the bases of the assessment methodologies of the first study, the interaction modeling of the STI and AOT is quantified. And the reliability assessment methodology about the diesel generator is reviewed and applied to the PSA code

  12. On the Efficient Simulation of Outage Probability in a Log-normal Fading Environment

    KAUST Repository

    Rached, Nadhir B.

    2017-02-15

    The outage probability (OP) of the signal-to-interference-plus-noise ratio (SINR) is an important metric that is used to evaluate the performance of wireless systems. One difficulty toward assessing the OP is that, in realistic scenarios, closed-form expressions cannot be derived. This is for instance the case of the Log-normal environment, in which evaluating the OP of the SINR amounts to computing the probability that a sum of correlated Log-normal variates exceeds a given threshold. Since such a probability does not admit a closed-form expression, it has thus far been evaluated by several approximation techniques, the accuracies of which are not guaranteed in the region of small OPs. For these regions, simulation techniques based on variance reduction algorithms is a good alternative, being quick and highly accurate for estimating rare event probabilities. This constitutes the major motivation behind our work. More specifically, we propose a generalized hybrid importance sampling scheme, based on a combination of a mean shifting and a covariance matrix scaling, to evaluate the OP of the SINR in a Log-normal environment. We further our analysis by providing a detailed study of two particular cases. Finally, the performance of these techniques is performed both theoretically and through various simulation results.

  13. Method for Evaluation of Outage Probability on Random Access Channel in Mobile Communication Systems

    Science.gov (United States)

    Kollár, Martin

    2012-05-01

    In order to access the cell in all mobile communication technologies a so called random-access procedure is used. For example in GSM this is represented by sending the CHANNEL REQUEST message from Mobile Station (MS) to Base Transceiver Station (BTS) which is consequently forwarded as an CHANNEL REQUIRED message to the Base Station Controller (BSC). If the BTS decodes some noise on the Random Access Channel (RACH) as random access by mistake (so- called ‘phantom RACH') then it is a question of pure coincidence which èstablishment cause’ the BTS thinks to have recognized. A typical invalid channel access request or phantom RACH is characterized by an IMMEDIATE ASSIGNMENT procedure (assignment of an SDCCH or TCH) which is not followed by sending an ESTABLISH INDICATION from MS to BTS. In this paper a mathematical model for evaluation of the Power RACH Busy Threshold (RACHBT) in order to guaranty in advance determined outage probability on RACH is described and discussed as well. It focuses on Global System for Mobile Communications (GSM) however the obtained results can be generalized on remaining mobile technologies (ie WCDMA and LTE).

  14. A study on assessment methodology of surveillance test interval and allowed outage time

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Chang Hyun; You, Young Woo; Cho, Jae Seon; Huh, Chang Wook; Kim, Do Hyoung; Kim, Ju Youl; Kim, Yoon Ik; Yang, Hui Chang; Park, Kang Min [Seoul National Univ., Seoul (Korea, Republic of)

    1998-03-15

    The objectives of this study is the development of methodology by which assesses the optimization of Surveillance Test Internal(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korean nuclear power plant safety. In this study, the survey about the assessment methodologies, modelings and results performed by domestic and international researches are performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method. The sensitivity analyses about the failure factors of the components are performed in the bases of the and AOT is quantified. And the reliability assessment methodology about the diesel generator is reviewed and applied to the PSA code. The qualitative assessment for the STI/AOR of RPS/ESFAS assured safety the most important system in the nuclear power plant are performed.

  15. A study on assessment methodology of surveillance test interval and Allowed Outage Time

    Energy Technology Data Exchange (ETDEWEB)

    Che, Moo Seong; Cheong, Chang Hyeon; Ryu, Yeong Woo; Cho, Jae Seon; Heo, Chang Wook; Kim, Do Hyeong; Kim, Joo Yeol; Kim, Yun Ik; Yang, Hei Chang [Seoul National Univ., Seoul (Korea, Republic of)

    1997-07-15

    Objectives of this study is the development of methodology by which assesses the optimization of Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korean nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches are performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method. In the second year of this study, the sensitivity analyses about the failure factors of the components are performed in the bases of the assessment methodologies of the first study, the interaction modeling of the STI and AOT is quantified. And the reliability assessment methodology about the diesel generator is reviewed and applied to the PSA code.

  16. Outage and ser performance of spectrum sharing system with TAS/MRC

    KAUST Repository

    Khan, Fahd Ahmed

    2013-06-01

    Capacity of the secondary network degrades due to the interference constraint from the primary network. The secondary network capacity can be enhanced by means of spatial diversity, that can be achieved by adding multiple antennas on the terminals. In this paper, the performance of a multiple-input multiple-output (MIMO) secondary link with transmit antenna selection (TAS) at the transmitter and maximum ratio combining (MRC) at the receiver is analysed. A peak transmit power constraint is considered in addition to the interference power constraint. For a Rayleigh faded channel, closed-form expression for the outage probability of a MIMO cognitive system (MIMO-CS) with TAS/MRC is derived. In addition, closed-form expressions of the moment generating function and the symbol error rate are also obtained. The performance of this system is analyzed for asymptotic regimes and it is shown that TAS/MRC in a MIMO-CS achieves a generalized diversity order of nTnR, where nT and nR are the number of transmit and receive antennas, respectively. Numerical results are also presented to corroborate the derived analytical results. © 2013 IEEE.

  17. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    International Nuclear Information System (INIS)

    Mankamo, T.; Kim, I.S.; Samanta, P.K.

    1992-01-01

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested

  18. Gentilly 2 steam generators Spring 2000 outage: tubesheet waterlance cleaning and inspection; upper bundle inspection

    International Nuclear Information System (INIS)

    Akeroyd, J.K.; Plante, S.

    2000-01-01

    A review of the secondary side maintenance activities recently completed during the Gentilly 2 Annual Spring 2000 Maintenance Outage. Activities included: 1) Tubesheet intertube waterlance cleaning and visual inspection, 2) First tube support plate, in-bundle visual inspection of the hot leg, and 3) Upper bundle tube support plate visual inspection. A description of the waterlancing and inspection equipment and setup in the RB at Gentilly 2 is provided. Several innovative techniques were successfully employed and yielded savings in critical path duration, labour and personnel radiation dose. These included accessing the SG tubesheet region through one handhole only and sludge removal utilizing the SG blowdown system. Plant personnel judged tubesheet sludge removal successful. Before and after results of the cleaning process along with samples of the visual inspection results are provided. Inspection of the first support plate, which was a repeat of an inspection done in 1997, was conducted along with an in-bundle inspection of the upper tube supports. Results are presented along with a discussion of the implications for future steam generator maintenance. (author)

  19. Evaluation of allowed outage times (AOTS) from a risk and reliability standpoint

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1989-08-01

    This report describes the basic risks associated with allowed outage times (AOTS), defines strategies for selecting the risks to be quantified, and describes how the risks can be quantified. This report provides a basis for risk-based approaches for regulatory and plant implementation. The AOT risk evaluations can be applied to proposed one-time AOT changes, or to permanent changes. The evaluations can also be used to quantify risks associated with present AOTs, and in establishing AOTs from a risk perspective. The report shows that the standard way of calculating AOT risks in probabilistic risk analyses (PRAs) generally is not sufficient when evaluating all the risks associated with an AOT in order to assess its acceptability. The PRA calculates an average AOT risk which includes the frequency at which the AOT is expected to occur. Other risks associated with an AOT include the single downtime risk, which is the risk incurred when (given) the AOT has occurred. The single downtime risk is generally the most applicable risk in determining the acceptability of the AOT. The single downtime risks are generally much larger than the PRA-averaged risk. For more comprehensive evaluations, both risks should be calculated. The report also describes other risks which can be considered, including personnel and economic risks. Finally, the report discusses the detailed evaluations which are involved in calculating AOT risks, including considerations of uncertainty. (author)

  20. On the Efficient Simulation of Outage Probability in a Log-normal Fading Environment

    KAUST Repository

    Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    The outage probability (OP) of the signal-to-interference-plus-noise ratio (SINR) is an important metric that is used to evaluate the performance of wireless systems. One difficulty toward assessing the OP is that, in realistic scenarios, closed-form expressions cannot be derived. This is for instance the case of the Log-normal environment, in which evaluating the OP of the SINR amounts to computing the probability that a sum of correlated Log-normal variates exceeds a given threshold. Since such a probability does not admit a closed-form expression, it has thus far been evaluated by several approximation techniques, the accuracies of which are not guaranteed in the region of small OPs. For these regions, simulation techniques based on variance reduction algorithms is a good alternative, being quick and highly accurate for estimating rare event probabilities. This constitutes the major motivation behind our work. More specifically, we propose a generalized hybrid importance sampling scheme, based on a combination of a mean shifting and a covariance matrix scaling, to evaluate the OP of the SINR in a Log-normal environment. We further our analysis by providing a detailed study of two particular cases. Finally, the performance of these techniques is performed both theoretically and through various simulation results.