WorldWideScience

Sample records for biblis on-site interim

  1. Consequences of the Federal Administrative Court decisions about the Biblis on-site interim store and the 'Biblis condition' as seen by the Nuclear Regulatory Authority of the State of Baden-Wuerttemberg; Folgerungen aus den Urteilen des Bundesverwaltungsgerichts zum Standortzwischenlager Biblis und zur 'Biblis-Auflage' aus der Sicht der Atomaufsichtsbehoerde des Landes Baden-Wuerttemberg

    Energy Technology Data Exchange (ETDEWEB)

    Rauscher, Dieter [Umweltministerium Baden-Wuerttemberg, Stuttgart (Germany)

    2009-03-15

    On March 17, 2005, the Baden-Wuerttemberg State Ministry of Economics, following instructions by the Federal Ministry for the Environment, Nature Conservation, and Nuclear Safety (BMU), imposed an ex-post-facto condition on the licensee of the Philippsburg Units 1 and 2 nuclear power station. Its content can be summed up as follows: In case of deviations from criteria specified in the license which are relevant to accident management, the plant must be shut down. In case of suspicion that, for whatever reason, accident management could be doubtful, accident management must be demonstrated to function; failing this, the plant must be shut down. In a decision of February 26, 2007, the Baden-Wuerttemberg State Court of Administration set this condition aside. The Federal Administrative Court, in its ruling of April 10, 2008, essentially confirmed the decision of the court of first instance. Both decisions are analyzed. Licensees and public authorities are shown the general framework of administrative law within which their relations are regulated. Another subject covered is jurisdiction about provisions against damage in connection with the ruling of the Federal Administrative Court of April 10, 2008 in the matter of the Brunsbuettel interim store. The court comments on the question of provision against damage in the area of protection, develops the dogma from scratch again as to the borderlines separating provisions against damage from residual risk and, within this framework, addresses the problem of third-party action against execution, especially so with respect to protection. The question of possible repercussions upon practice is discussed also for this court ruling. (orig.)

  2. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  3. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Science.gov (United States)

    2010-07-01

    ....212 Making the hazardous waste determination at an on-site interim status or permitted treatment... hazardous waste permit or interim status as soon as it arrives in the on-site treatment, storage or disposal... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste,...

  4. Biblis A: operation justifiable at all times

    International Nuclear Information System (INIS)

    For some time already, the government of the state of Hessen has executed legislation as if it was rehearsing the nuclear phase-out. The most prominent object of its attention is the Biblis nuclear power station of RWE Energie AG with its units A and B. Unit A (1204 megawatts) was shut down from April '95 to August '96, although the defects discovered in the 1995 annual check were quickly remedied. Klaus Distler, the director of the power station, points out the safety standards and protection targets of the plant. He also discusses the results of the safety analysis carried out by the technical control board (''TUeV''). (orig.)

  5. Safeguards for spent nuclear fuel in transfer from wet storage to dry storage in on-site interim storage facilities

    International Nuclear Information System (INIS)

    Germany initially planned to store spent nuclear fuel in the two away-from-reactor interim storage facilities built at Ahaus and Gorleben. The current approach for spent fuel management is on-site interim storage in transport and storage casks as part of a political agreement between the German government and the nuclear operators on the future use of nuclear energy. A reason for this is to avoid near term transportation of spent fuel determined for direct final disposal via public road or rail systems to away-from-reactor storage facilities. Recent legislation has triggered the construction of 12 on-site dry storage facilities at nuclear power plants. Currently, such facilities are being taken into operation on a step-by-step basis. There is a strong need to develop acceptable safeguards concepts for both transfer and dry storage of spent fuel, ideally, a standard safeguards concept that would match all German nuclear power plant sites without ignoring technical and organisational differences. The paper will address the relevant issues and give an overview of the status of safeguards implementation. (author)

  6. El doctor Francisco Guerra, bibliófilo

    OpenAIRE

    Sánchez Mariana, Manuel

    2007-01-01

    Biografía del doctor Francisco Guerra, médico y uno de los bibliófilos más representativos de comienzos del s. XXI, poseedor de una importantísima biblioteca, donada por decisión propia, en el año 2006 a la Biblioteca Histórica de la Universidad Complutense. La biblioteca está compuesta por más de 4000 impresos y manuscritos de una variada seleccion de títulos humanísticos y científicos: clásicos griegos, romanos y españoles, clásicos de economía, descubrimiento de América, crónicas españolas...

  7. The mitochondrial genome of Cethosia biblis (Drury) (Lepidoptera: Nymphalidae).

    Science.gov (United States)

    Xin, Tianrong; Li, Lei; Yao, Chengyi; Wang, Yayu; Zou, Zhiwen; Wang, Jing; Xia, Bin

    2016-07-01

    We present the complete mitogenome of Cethosia biblis (Drury) (Lepidoptera: Nymphalidae) in this article. The mitogenome was a circle molecular consisting of 15,286 nucleotides, 37 genes, and an A + T-rich region. The order of 37 genes was typical of insect mitochondrial DNA sequences described to date. The overall base composition of the genome is A (37.41%), T (42.80%), C (11.87%), and G (7.91%) with an A + T-rich hallmark as that of other invertebrate mitochondrial genomes. The start codon was mainly ATA in most of the mitochondrial protein-coding genes such as ND2, COI, ATP8, ND3, ND5, ND4, ND6, and ND1, but COII, ATP6, COIII, ND4L, and Cob genes employing ATG. The stop codon was TAA in all the protein-coding genes. The A + T region is located between 12S rRNA and tRNA(M)(et). The phylogenetic relationships of Lepidoptera species were constructed based on the nucleotides sequences of 13 PCGs of mitogenomes using the neighbor-joining method. The molecular-based phylogeny supported the traditional morphological classification on relationships within Lepidoptera species. PMID:26029877

  8. O bibliógrafo: a experiência na Unicamp

    Directory of Open Access Journals (Sweden)

    Liane Maria Bertucci Bertucci

    2001-01-01

    Full Text Available Relatando o processo de escolha de um profissional para atuar como bibliógrafo (bibliographer na Biblioteca do Instituto de Filosofia e Ciências Humanas da UNICAMP, o texto discute aspectos do trabalho deste profissional na avaliação e manutenção do acervo da biblioteca, realizando a seleção dos materiais doados, indicando títulos para novas aquisições, solicitando doações para a Biblioteca e elaborando projetos que podem resultar em compra de livros e outros materiais ou em verba para cuidados especiais com o patrimônio da BIBIFCH. relatando el proceso de elección de un profesional para actuar como bibliógrafo (bibliographer en la Biblioteca del Instituto de Filosofía y Ciencias Humanas de la Universidad Estadual de Campinas – UNICAMP, el texto discute aspectos del trabajo de este profesional en la evaluación y mantenimiento del acervo de la biblioteca, realizando la selección de los materiales donados, indicando títulos para nuevas adquisiciones, solicitando donaciones para la biblioteca y elaborando proyectos que pueden resultar en la compra de libros y otros materiales o en recursos financieros para cuidados especialies relativos al patrimonio de la BIBIFCH.

  9. Considerations on collective doses in the nuclear power plant at Biblis

    International Nuclear Information System (INIS)

    The radiation protection supervision in the nuclear power plant at Biblis includes control of the individual personal doses as well as the control of the collective doses for specified periods and jobs. The collective dose can be taken as an indicator for the effectiveness of the planning and execution of jobs and the radiation protection control. Based on the experiences of four refuelling and inspection periods it was tried to estimate amount and time-dependency of the collective doses for the refuelling period of unit B 1979 before this period. For such an estimation one needs some informations: data about dose intensive jobs, gained from experience, a day-based dose value for the sum of jobs with low doses, degree of 'stabilization' concerning organisation, planning, experiences and units. (orig.)

  10. Zinc injection in the primary coolant of PWR for dose rate reduction - experience from Biblis and Obrigheim

    International Nuclear Information System (INIS)

    Zinc addition for reduction of radiation fields was qualified for Siemens-designed PWRs in a three year program and then implemented at three plants: in September 1996 at the 1300 MW unit B of the Biblis power station, in January 1998 at the 1225 MW unit A, and in February 1998 at the 357 MW PWR Obrigheim. This paper gives an overview of the experience gathered with zinc addition at these plants over one respectively two fuel cycles. Zinc addition could be implemented into daily plant operation practice without any problems. No negative influence on fuel and the performance of reactor coolant pumps could be detected. The compatibility of the method with the overall plant could be proven. Onset of zinc addition resulted in an increase in corrosion and activation products in the primary coolant. Surface investigations showed that zinc was incorporated into oxide layers on system surfaces. Measurement of dose rates and surface g activities at system surfaces during annual plant revisions showed the predicted decrease in radiation levels of 10 to 15 percent per year or cycle, on the average. The effects of the dose rate reduction at the plants on personnel doses are still difficult to quantify, as various parameters are superimposed. The observed tendencies indicate that zinc injection leads to the expected slow improvement in the situation in the plants. (orig.)

  11. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  12. Pecat amagat és mitg perdonat.... La polèmica entre mossèn Gudiol i Antoni Bulbena a ran de les edicions bibliòfiles de llibres eròtics

    OpenAIRE

    Domènech, Albert

    2014-01-01

    Resum: El desembre de 1911 aparegué a la premsa local de Vic un article que va aixecar molta polseguera entre els bibliòfils de tot Catalunya. Un mossèn –historiador de l’art i gran moralista- acusava un conegut editor de llibres de bibliofília –sense dir-ne el nom-, d’editar llibres luxosos de contingut priàpic (pornogràfic). Aquest fet anecdòtic ens serveix per saber qui era l’editor esmentat, què hi havia de cert en l’»acusació» i com va encaixar el vituperat veure’s exposat a la vergonya ...

  13. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  14. Present on Site

    DEFF Research Database (Denmark)

    Ingemann, Bruno

    Why are exhibitions and museums so important? What can they be used for? Who determines relevance in a transformative process? Transforming exhibitions is not just something you do, it is something that gets better the more you do it. This book looks at the intersection of the visitor or user, wh...... • Invisibles – The exhibition design processes • Openings – Category, objects and communication Present on site is relevant not only for students and researchers in the field of museum communication, media and design studies, but also for exhibition and museum practitioners....

  15. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  16. Interim Design Report

    OpenAIRE

    Abrams, R.; Agarwalla, S.; A. Alekou; Andreopoulos, C.; Ankenbrandt, C.; Antusch, S.; M. Apollonio(19, d); Aslaninejad, M.; J. Back; P. Ballett; Barker, G.; Beard, K.; Benedetto, E; Bennett, J.; Berg, J.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RD...

  17. Report on interim storage of spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    The report on interim storage of spent nuclear fuel discusses the technical, regulatory, and economic aspects of spent-fuel storage at nuclear reactors. The report is intended to provide legislators state officials and citizens in the Midwest with information on spent-fuel inventories, current and projected additional storage requirements, licensing, storage technologies, and actions taken by various utilities in the Midwest to augment their capacity to store spent nuclear fuel on site.

  18. Interim Design Report

    CERN Document Server

    Abrams, R J; Alekou, A; Andreopoulos, C; Ankenbrandt, C M; Antusch, S; Apollonio, M; Aslaninejad, M; Back, J; Ballett, P; Barker, G; Beard, K B; Benedetto, E; Bennett, J R J; Berg, J S; Bhattacharya, S; Blackmore, V; Blennow, M; Blondel, A; Bogacz, A; Bonesini, M; Bontoiu, C; Booth, C; Bromberg, C; Brooks, S; Bross, A; Caretta, O; Cervera-Villanueva, A; Choubey, S; Cline, D; Cobb, J; Coloma, P; Coney, L; Cummings, M A C; Davenne, T; de Gouvea, A; Densham, C; Ding, X; Donini, A; Dornan, P; Dracos, M; Dufour, F; Eccleston, R; Edgecock, R; Efthymiopoulos, I; Ellis, M; Fernandez-Martinez, E; Fernow, R; Flanagan, G; Gallardo, J C; Gandhi, R; Garoby, R; Gavela, B; Geer, S; Gilardoni, S; Gomez-Cadenas, J J; Goswami, S; Graves, V B; Gupta, R; Hanson, G; Harrison, P; Hart, T; Hernandez, P; Huber, P; Indumathi, D; Johnson, R P; Johnstone, C; Karadzhov, Y; Kelliher, D; Kirk, H; Kopp, J; Kudenko, Y; Kuno, Y; Kurup, A; Kyberd, P; Laing, A; Li, T; Lindner, M; Long, K; Pavon, J Lopez; Loveridge, P; Machida, S; Majumdar, D; Maltoni, M; Martin-Albo, J; Martini, M; Matev, R; McDonald, K T; McFarland, A; Meloni, D; Mezzetto, M; Migliozzi, P; Mishra, S R; Mokhov, N; Mondal, N; Morfin, J; Mori, Y; Morozov, V; Neuffer, D; Ota, T; Palladino, V; Parke, S; Pascoli, S; Pasternak, J; Peltoniemi, J; Petti, R; Planche, T; Popovic, M; Pozimski, J; Prior, G; Prior, C; Rees, G; Rigolin, S; Roberts, T J; Roblin, Y; Rogers, C; Samulyak, R; Schwetz, T; Simos, N; Sinha, N; Skoro, G; Snopok, P; Soler, F J P; Souchlas, N; Strait, J; Stratakis, D; Striganov, S; Tang, J; Thomason, J W G; Tortora, L; Tsenov, R; Winter, W; Witte, H; Yasuda, O; Yoshikawa, C Y; Zisman, M

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  19. Ontario interim market

    International Nuclear Information System (INIS)

    Ontario's White Paper outlined the government's plan to restructure the electric power industry to an open market by the year 2000. Bill 35, when passed, will be the legislation required to start the process of electricity restructuring laid out in the White Paper. In the section dealing with the Independent Market Operator, the White Paper states that the Ontario government, as a transitional step to an open market, will introduce an element of competition into the industry by establishing an interim market for replacement power and impose a discipline on Ontario Hydro. Unfortunately, this transitional step did not live up to its billing and has had a minimal impact on both Ontario Hydro and the marketplace. Nevertheless, the experiment has provided a peek into the future of electricity and power pricing in Ontario, by making price information available and posted on the Internet. This paper examines how informative this experience has been and looks at the year just past in perspective. One of the notable developments was that the threat of a power shortage as a result of shutting down seven of Ontario Hydro's nuclear reactors, did not materialize. Ontario Hydro's fossil fuel generation plants were able to step into the breach and generate enough energy to make up for the reduction in nuclear production, and did so within the allowable limit for acid gas emissions. Some interesting developments in pricing electric power exported to the US in the summer of of 1998 are also reviewed for what they can teach us about the value of transparency and full price disclosure. 2 figs

  20. An Interim President Sets the Stage

    Science.gov (United States)

    Guardo, Carol J.

    2006-01-01

    An interim president often plays a crucial role in leading a college or university. In some instances, the interim can address and resolve troublesome issues and thus clear the way for the new president to generate progress. In others, the interim stays the course so that the institution maintains its momentum and seizes strategic opportunities to…

  1. 32 CFR 776.82 - Interim suspension.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Interim suspension. 776.82 Section 776.82... Complaint Processing Procedures § 776.82 Interim suspension. (a) Where the Rules Counsel determines there is... interim suspension, pending completion of a professional responsibility investigation. The...

  2. 22 CFR 127.8 - Interim suspension.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Interim suspension. 127.8 Section 127.8 Foreign... Interim suspension. (a) The Managing Director of the Directorate of Defense Trade Controls or the Director of the Office of Defense Trade Controls Compliance is authorized to order the interim suspension...

  3. Development of Accident Scenario for Interim Spent Fuel Storage Facility Based on Fukushima Accident

    International Nuclear Information System (INIS)

    700 MTU of spent nuclear fuel is discharged from nuclear fleet every year and spent fuel storage is currently 70.9% full. The on-site wet type spent fuel storage pool of each NPP(nuclear power plants) in Korea will shortly exceed its storage limit. Backdrop, the Korean government has rolled out a plan to construct an interim spent fuel storage facility by 2024. However, the type of interim spent fuel storage facility has not been decided yet in detail. The Fukushima accident has resulted in more stringent requirements for nuclear facilities in case of beyond design basis accidents. Therefore, there has been growing demand for developing scenario on interim storage facility to prepare for beyond design basis accidents and conducting dose assessment based on the scenario to verify the safety of each type of storage

  4. Big Oaks National Wildlife Refuge : Interim Plans : 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This interim plan for Big Oaks National Wildlife Refuge cover an interim comprehensive conservation plan, a hunting and fishing plan and an interim compatibility...

  5. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  6. 45 CFR 1623.6 - Interim funding.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  7. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... controls are used for a soil area that is subject to erosion, measures shall be taken to contain the soil... specified in § 35.1320, dust control, and lead-contaminated soil control. As provided by § 35.155, interim... be removed. (f) Soil-lead hazards. (1) Interim control treatments used to control soil-lead......

  8. THESAURUS OF ERIC DESCRIPTORS (INTERIM) JANUARY 1967.

    Science.gov (United States)

    1967

    THE "THESAURUS OF ERIC DESCRIPTORS (INTERIM)" SUPERSEDES, AND REPRESENTS A REFINEMENT OF, THE "THESAURUS OF ERIC DESCRIPTORS." THE INTERIM ISSUE IS A PRELIMINARY ERIC SYSTEM TOOL AND IS NOT TO BE CONSIDERED A COMPLETE REPRESENTATION OF THE FINAL PRODUCT. THIS REFINEMENT IS THE RESULT OF TWO MAJOR PROJECTS--(1) THE INCORPORATION OF SUGGESTIONS…

  9. 15 CFR 904.322 - Interim action.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as...

  10. Efficient on-site construction

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff; Hvam, Lars

    2011-01-01

    Purpose – This research aims to analyse the implementation of a German platform for housing projects through a successful case on modern methods of construction featuring efficient on-site construction. Through continuous development, the platform has been carefully designed to suit a carefully...... selected market – optimising cost and value. Based on the platform, the company has managed to create a high-quality product at low cost. In fact, they have managed to reduce costs by more than 30 per cent, enabling the company to sell houses to people that normally would not be able to afford a house...

  11. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  12. Report on interim storage of spent nuclear fuel. Midwestern high-level radioactive waste transportation project

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    The report on interim storage of spent nuclear fuel discusses the technical, regulatory, and economic aspects of spent-fuel storage at nuclear reactors. The report is intended to provide legislators state officials and citizens in the Midwest with information on spent-fuel inventories, current and projected additional storage requirements, licensing, storage technologies, and actions taken by various utilities in the Midwest to augment their capacity to store spent nuclear fuel on site.

  13. Model study radioecology Biblis. Vol. 1

    International Nuclear Information System (INIS)

    The first part of the study deals with questions concerning radiation on account of the release of radioactive substances into the environment via the aquatic pathway. The discussion is preceded by a lecture on the basis for the calculations, and on a lecture on the results of primary radiological model calculations. The colloquium aims at establishing existing knowledge, at coordinating deviating opinions, and at elaborating questions still open and the possibility to deal with these. On the whole, ten questions have emerged. They are mainly concerned with site conditions. These questions will be dealt with in the form of partial studies by individual participants or by task groups. The results will be discussed at further colloquia. (orig.)

  14. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  15. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  16. Training Artisans On-Site

    Directory of Open Access Journals (Sweden)

    Edoghogho Ogbeifun

    2011-09-01

    Full Text Available The decline in apprenticeship in both the public and private sectors, the increasing use of sub-contractors as well as the uncoordinated approach in the informal sector are contributing factors to the shortage of skilled artisans in the construction industry. Artisans training can be introduced and implemented through the adoption of progressive implementation of construction processes commencing work from areas requiring low skill demands to areas of high skill demand. The success of this principle hinges on the collaborative effort of the key project stakeholders. The client should be willing to absorb extra cost and delays in the project; the design and contract documentation should facilitate on-site training, and  the consultant actively guide the contractor and the construction processes to achieve the training objectives. The exploratory research method was adopted in this study and research revealed that this principle was used in a project in the UK and in the development of infrastructure in the tourism industry of South Africa .It is being recommended that the principle be adapted by the public sector for the development of small size infrastructures that can be repeated in many places. This will boost the quality and quantity of artisans, enhance employability, reduce rural urban migration and alleviate poverty.Keywords: Skilled artisans, on-site training, progressive construction processes, project stakeholders, contract documentation. 

  17. Russian River Interim Action Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An interim action plan is presented to guide the 1979 management of the Kenai National Moose Range's portion of the lower Russian River and its confluence with the...

  18. Interim and End States, Sellafield, United Kingdom

    International Nuclear Information System (INIS)

    The Sellafield PFSP is an uncovered external pond, currently in the pre-decommissioning waste retrieval phase. Further consideration is now being given to the next phases of decommissioning, including defining interim states and the end state for the facility

  19. CANDU spent fuel dry storage interim technique

    International Nuclear Information System (INIS)

    CANDU heavy water reactor is developed by Atomic Energy of Canada (AECL) it has 40 years of design life. During operation, the reactor can discharge a lot of spent fuels by using natural uranium. The spent fuel interim storage should be considered because the spent fuel bay storage capacity is limited with 6 years inventory. Spent fuel wet interim storage technique was adopted by AECL before 1970s, but it is diseconomy and produced extra radiation waste. So based on CANDU smaller fuel bundle dimension, lighter weight, lower burn-up and no-critical risk, AECL developed spent fuel dry interim storage technique which was applied in many CANDU reactors. Spent fuel dry interim storage facility should be designed base on critical accident prevention, decay heat removal, radiation protection and fissionable material containment. According to this introduction, analysis spent fuel dry interim storage facility and equipment design feature, it can be concluded that spent fuel dry interim storage could be met with the design requirement. (author)

  20. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  1. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  2. Testing in support of on-site storage of residues in the Pipe Overpack Container

    International Nuclear Information System (INIS)

    The disposition of the large back-log of plutonium residues at the Rocky Flats Environmental Technology Site (Rocky Flats) will require interim storage and subsequent shipment to a waste repository. Current plans call for disposal at the Waste Isolation Pilot Plant (WIPP) and the transportation to WIPP in the TRUPACT-II. The transportation phase will require the residues to be packaged in a container that is more robust than a standard 55-gallon waste drum. Rocky Flats has designed the Pipe Overpack Container to meet this need. It is desirable to use this same waste packaging for interim on-site storage in non-hardened buildings. To meet the safety concerns for this storage the Pipe Overpack Container has been subjected to a series of tests at Sandia National Laboratories in Albuquerque, New Mexico. In addition to the tests required to qualify the Pipe Overpack Container as a waste container for shipment in the TRUPACT-II several tests were performed solely for the purpose of qualifying the container for interim storage. This report will describe these tests and the packages response to the tests. 12 figs., 3 tabs

  3. EMCS Retrofit Analysis - Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  4. Interim Financial Reporting in Function of Proper Decision Makind

    OpenAIRE

    Kacanski, Slobodan; Tomašević, Stevan; Vlaović-Begović, Sanja

    2014-01-01

    This paper analyses the attributes of interim financial reporting, as well as performs overview and interpretation of International Accounting Standard 34 which deals with this issue. The paper emphasizes risk and effects of interim financial statements implementation in decision making process. Time and cost limitations significantly influence the level of reliability on interim repors since those reports were not audited. This paper analyses the attributes of interim financial reporting,...

  5. Interim-Management: A paradox for leadership research?

    OpenAIRE

    Bruns, Jürgen; Kabst, Rüdiger

    2005-01-01

    The study focuses on Interim-Management as a so far rarely discussed phenomenon of the flexible firm. Contradicting popular leadership perception, the authors argue that Interim-Management does not constitute a leadership paradox but can be explained by established organization theory. In particular, transaction cost economics as well as resource-based view help explain the utilization of Interim-Management. Furthermore, the authors show that Interim-Management constitutes a response to reduc...

  6. Design review report FFTF interim storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Scott, P.L.

    1995-01-03

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location.

  7. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  8. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  9. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  10. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  11. 12 CFR 268.505 - Interim relief.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Interim relief. 268.505 Section 268.505 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM RULES..., eligibility for a within-grade increase, or the completion of the service requirement for career tenure,...

  12. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Interim goals. 385.38 Section 385.38 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN Ensuring Protection of the...

  13. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  14. Interim storage facility for spent fuel

    International Nuclear Information System (INIS)

    The spent fuel generated from the operation of a nuclear power plant is to be treated in the reprocessing plant in Rokkasho, Aomori. At present, spent fuel is stored in the nuclear power plant until it is reprocessed. However the amount of spent fuel generated exceeds the capacity of the reprocessing plant. Hence an additional spent fuel storage facility is needed for the nuclear fuel cycle. The spent fuel interim storage facility is the first institution in Japan that stores spent fuel outside of the nuclear power plant site. Our company has received an order for internal equipment for this facility. This paper introduces an overview of the interim storage facility for spent fuel. (author)

  15. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  16. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  17. Recommendations for on-site vibration standards

    International Nuclear Information System (INIS)

    Unless certain common sense precautions are observed, the luminosity of the Collider may be adversely affected by otherwise preventable ground vibrations. Previous work indicates that ground vibrations can be thought of as being caused by the sum of (a) natural and (b) cultural (i.e., man-made) effects, of which the latter can be further divided into uncontrollable and controllable. Examples of category (b) include: traffic, both on site and off site; construction activity on site and off site; assembly of equipment in nearby I.R. Halls, even footsteps in the tunnel; or continuously operating machinery. This note addresses question with respect to category (b) iv., only. As a guide, the order of magnitude of amplitudes and frequencies of presently, (on site) known noise polluters is described in relation to naturally occurring disturbances and to the tolerances required for successful Collider operation. Some methods of mitigating the effects of on site machinery are suggested. Finally, a vibration tolerance level specification is recommended as well as a mechanism to police adherence to such standards. 6 figures

  18. Requirements of on-site facilities

    International Nuclear Information System (INIS)

    1) Requirements of on-site facilities: a) brief description of supplying the site with electricity and water; communication facilities, b) necessary facilities for containment and pipeline installation, c) necessary facilities for storage, safety, accommodation of personnel, housing; workshops; 2) Site management: a) Organisation schedules for 'turn-key-jobs' and 'single commission', b) Duties of the supervisory staff. (orig.)

  19. SICOM: On-site inspection systems

    International Nuclear Information System (INIS)

    As the irradiation conditions become more demanding for the fuel than in the past, there is a need for surveillance programs to gather in-reactor operating experience. The data obtained in these programs can be used to assess the performance of current fuel designs and the improvements incorporated to the fuel assembly design, the performance of the advanced cladding alloys, etc. In these regards, valuable data is obtained from on-site fuel inspections. These on-site data comprise fuel assembly dimensional data such as length and distortion (tilt, twist and bow) and fuel rod data such as length and oxide thickness. These data have to be reliable and accurate to be useful thus, demanding a high precision inspection equipment. However, the inspection equipment has to be also robust and flexible enough to operate in the plant spent fuel pool and, sometimes, without interfering in the works carried out during a plant outage. To meet these requirements, during the past years ENUSA and TECNATOM have developed two on-site inspection systems. While the first system can perform most of the typical measurements in a stand-alone manner thus, without interfering with the critical path of the reload, the second one reduces the inspection time but requires using the plant capabilities. The paper describes both equipment for fuel on-site inspection, their characteristics and main features. (author)

  20. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... has neither established transport and termination rates based on forward-looking economic cost studies... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from...

  1. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  2. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  3. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Science.gov (United States)

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power...

  4. Site development interim removable dental prosthesis.

    Science.gov (United States)

    Pasquinelli, Kirk L; Sze, Alexander J; Matosian, Alex J

    2016-07-01

    Transitioning a patient with partial edentulism through hard and soft tissue grafting to an implant restoration with an interim removable dental prosthesis (IRDP) presents a challenge to the restorative dentist. The management of grafted sites requires care, and without the appropriate design, an IRDP may impede surgical outcomes and place the graft at risk for displacement or necrosis. A site development IRDP (SDIRDP) for a grafted site must fulfill restorative goals and promote the surgical objectives for site development. A technique is described for fabricating an SDIRDP that facilitates surgical procedures and maintains prosthetic goals. PMID:26831920

  5. Central waste complex interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    Cain, F.G.

    1995-05-15

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste.

  6. National NIF Diagnostic Program Interim Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  7. Interim Reliability Evaluation Program procedures guide

    International Nuclear Information System (INIS)

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  8. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  9. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  10. On site monitoring of concrete reinforcement corrosion

    International Nuclear Information System (INIS)

    Reinforcement corrosion is the result of the penetration through the concrete cover of the carbon dioxide (carbonation) and of chlorides. It is not a usual event in nuclear plants due to the relatively short service life required. However, in waste storage facilities with much longer target service life.. it may be one of the most relevant deterioration processes. Therefore. its detection and measurement should be one of the aspects to be taken into account in the overall management of these kind of installations. In present paper, the most usual electrochemical techniques to measure reinforcement corrosion are described. The aims of the application of these techniques is. 1) to control the performance of new constructions (embedded sensors). 2) to detect corroding areas in existing structures (by on-site measurements or by installing external sensors) and implement these values in models to recalculate the structural performance and 3) to control the efficiency of repair techniques. In the paper is as well presented the evolution from 1995 of corrosion parameters (corrosion rate, corrosion potential, electrical resistivity, concrete strains, oxygen availability) obtained in a pilot container buried in real conditions in the repository of El-Carbril-Spain. The results indicate that the temperature is the most relevant variable influencing the measurements. In conclusion: Corrosion of reinforcement can be approximately model and accurately measured on-site. The periodical corrosion rate measurements on its monitoring seems very necessary to assess present conditions of concrete structures and is a very useful tool in the case of cooling towers of power plants. Techniques based in the measurement of Polarization Resistance have been implemented in portable corrosion rate meters to obtain corrosion rate values, and corrosion-data-loggers are now operative in different structures to monitor corrosion related parameters. (authors)

  11. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  12. Spent Fuel Behaviour During Interim Storage

    International Nuclear Information System (INIS)

    Objective: Review of spent fuel data relevant for future storage in Spain Perform destructive and non-destructive examinations on irradiated and non-irradiated fuel rods relevant to Spanish spent fuel management. Research approach: Among the programmes initiated in the last years (finished or about to be finished) one may highlight the following ones: • Isotopic measurements on high burnup fuels: up to 75 GW·d·t(U)-1 PWR and 53 GW·d·t(U)-1 BWR peak values; • Mechanical tests on high burnup PWR (ZIRLO) cladding and BWR (Zry-2) cladding samples; • Mechanical tests on unirradiated ZIRLO rods. Influence of hydrides content; • Modelling of mechanical tests with unirradiated claddings; • Interim storage creep modelling; • Burnup measurement equipment; • Fuel database

  13. AGR-1 Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Machael Abbott

    2009-08-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010.

  14. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137CsCl and 90SrF2, stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  15. TANK FARM INTERIM SURFACE BARRIER MATERIALS AND RUNOFF ALTERNATIVES STUDY

    Energy Technology Data Exchange (ETDEWEB)

    HOLM MJ

    2009-06-25

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  16. Big Oaks National Wildlife Refuge : Interim Public Access Plan : 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This interim plan covers public access for Big Oaks National Wildlife Refuge. Sections include introduction, safety briefing protocols, entry procedure, types of...

  17. Strategic Review of Medical Training and Career Structure Interim Report

    OpenAIRE

    Department of Health

    2013-01-01

    Click here to download Strategic Review of Medical Training and Career Structure Interim Report PDF 44kb Click here to download Strategic Review of Medical Training and Career Structure Terms of Reference PDF 59KB

  18. Walnut Creek National Wildlife Refuge : Interim hunting plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This interim hunting plan for Neal Smith National Wildlife Refuge (formerly Walnut Creek National Wildlife Refuge) outlines hunting guidelines for the Refuge....

  19. Interim Land Use Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Interim Land Use Plan for Muscatatuck NWR provides a brief history of the Refuge; summarizes present land conditions, needs, and habitat types; and provides an...

  20. Technical bases for interim storage of spent nuclear fuel

    International Nuclear Information System (INIS)

    The experience base for water storage of spent nuclear fuel has evolved since 1943. The technology base includes licensing documentation, standards, technology studies, pool operator experience, and documentation from public hearings. That base reflects a technology which is largely successful and mundane. It projects probable satisfactory water storage of spent water reactor fuel for several decades. Interim dry storage of spent water reactor fuel is not yet licensed in the US, but a data base and documentation have developed. There do not appear to be technological barriers to interim dry storage, based on demonstrations with irradiated fuel. Water storage will continue to be a part of spent fuel management at reactors. Whether dry storage becomes a prominent interim fuel management option depends on licensing and economic considerations. National policies will strongly influence how long the spent fuel remains in interim storage and what its final disposition will be

  1. Interim research assessment 2003-2005 - Computer Science

    OpenAIRE

    Mouthaan, A.J.; Hartel, P.H.

    2007-01-01

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  2. Security of radioactive sources: Interim guidance for comment

    International Nuclear Information System (INIS)

    The paper is a brief summary of the material contained in IAEA-TECDOC-1355, Security of Radioactive Sources: Interim Guidance for Comment, covering the topics of threat assessment, Security Groups and performance objectives, and security based categorization. (author)

  3. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  4. RATIO BETWEEN ACCOUNTING PRINCIPLES AND INTERIM FINANCIAL REPORTING

    OpenAIRE

    Claudia-Elena GRIGORAS-ICHIM

    2010-01-01

    In economic and financial communication, the common language is represented by accounting rules which consent the process of converting the operations afferent to economic development in figures (the situation of the one which prepares the interim financial reports) and a process to convert figures in economic transactions (the situation of the one using the interim financial reports). Therefore arises necessarily the “accounting standardization process” involving a complex of rules capable t...

  5. Liability for on-site nuclear property damage

    International Nuclear Information System (INIS)

    Typically, liability for on-site property addressed in contracts between operator and its suppliers. Nuclear power plant operators ordinarily protect themselves against risk of nuclear damage to on-site property by insurance. Nuclear liability laws do not specifically address liability for nuclear damage to on-site property. Nuclear plant owners should address risk of damage to on-site property when developing risk management program

  6. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  7. Radioactive waste interim storage in Germany; Zwischenlagerung von radioaktiven Abfaellen in Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-15

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  8. A review of proposed Glen Canyon Dam interim operating criteria

    Energy Technology Data Exchange (ETDEWEB)

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  9. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  10. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  11. 78 FR 56750 - Interim Staff Guidance on Environmental Issues Associated With New Reactors

    Science.gov (United States)

    2013-09-13

    ... COMMISSION Interim Staff Guidance on Environmental Issues Associated With New Reactors AGENCY: Nuclear... Notice: Draft Interim Staff Guidance on Environmental Issues Associated with New Reactors. ML12326A742 Interim Staff Guidance-026, Environmental Issues Associated with New Reactors. ML12326A811...

  12. Corporate Risk Disclosure: A Content Analysis of Swedish Interim Reports

    OpenAIRE

    Khaledi, Soheila

    2014-01-01

    The aim of this research is to examine the determinants of the level of corporate risk disclosure (CRD) in the interim reports of Swedish non-financial companies. A quantitative research approach is used, the sample data of which consist of 166 firms with 4,849 interim reports over a 10-year period. By utilizing the notion of risk and its definition, I have distinguished three categories of risk, namely risk as uncertainty, risk as threat and risk as opportunity. A systematic content analysis...

  13. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  14. 7 CFR 205.403 - On-site inspections.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Certification § 205.403 On-site inspections. (a) On-site inspections....

  15. 40 CFR 266.103 - Interim status standards for burners.

    Science.gov (United States)

    2010-07-01

    ... during interim status to industrial furnaces (e.g., kilns, cupolas) that feed hazardous waste for a... HAZARDOUS WASTE MANAGEMENT FACILITIES Hazardous Waste Burned in Boilers and Industrial Furnaces § 266.103... and industrial furnaces that burn hazardous waste where such standards define the...

  16. 17 CFR 210.10-01 - Interim financial statements.

    Science.gov (United States)

    2010-04-01

    ... ACT OF 1934, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935, INVESTMENT COMPANY ACT OF 1940, INVESTMENT... registrants reporting under § 210.9 shall show investment securities gains or losses separately regardless of...)(11) of Regulation S-K, (17 CFR 229.601(b)(11)). (3) If, during the most recent interim...

  17. Single Shell Tank (SST) Interim Stabilization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  18. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  19. 46 CFR 308.103 - Insured amounts under interim binder.

    Science.gov (United States)

    2010-10-01

    ... INSURANCE War Risk Hull and Disbursements Insurance § 308.103 Insured amounts under interim binder. (a... vessel had been requisitioned for title under section 902(a) of the Merchant Marine Act, 1936, as amended (46 App. U.S.C. 1242(a)) at the time of the attachment of the insurance under said policy:...

  20. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  1. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... registered by its manufacturer under 40 CFR part 79 according to the specifications in paragraphs (c) (1... hearing procedures shall be informal, and the hearing shall not be subject to or governed by 40 CFR part... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program....

  2. Interim analysis in long-term clinical trials

    NARCIS (Netherlands)

    G.A. van Es (Gerrit Anne)

    1990-01-01

    textabstractThe purpose of this dissertation is to evaluate the usefulness of both stopping rules and estimation methods in long-term clinical trials with interim analyses. The ASPECT trial, a long-term clinical trial to assess the effect of anticoagulant therapy on mortality in patients after myoca

  3. 42 CFR 417.808 - Interim per capita payments.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim per capita payments. 417.808 Section 417.808 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES... efficiency and economy, and will not result in excessive adjustment at the end of the reporting period....

  4. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Directory of Open Access Journals (Sweden)

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  5. Minish Named Interim Head of Admissions at Virginia Tech

    OpenAIRE

    Virginia Tech News

    2004-01-01

    Roberta M.Minish, of Blacksburg, Va., associate dean emeritus of Virginia Tech's former College of Human Sciences and Education, has been named interim director of undergraduate admissions at the university, effective Jan. 19. She fills the position left vacant in December with the resignation of Karen Torgersen.

  6. Penalty Inflation Adjustments for Civil Money Penalties. Interim Final Rule.

    Science.gov (United States)

    2016-06-27

    In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990, as amended by the Debt Collection Improvement Act of 1996, and further amended by the Bipartisan Budget Act of 2015, section 701: Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015, this interim final rule incorporates the penalty inflation adjustments for the civil money penalties contained in the Social Security Act

  7. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    International Nuclear Information System (INIS)

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  8. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  9. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  10. Managing the risks of on-site health centers.

    Science.gov (United States)

    Gorman, Kathleen M; Miller, Ross M

    2011-11-01

    This review sought to assess compliance concerns, determine risk management strategies, and identify opportunities for future research to contribute to employers' understanding of the laws and regulations that apply to on-site care. A comprehensive review of databases, professional organizations' websites, and journals resulted in 22 publications reporting on the consequences of noncompliance among on-site health centers accepted for inclusion. None of those studies reported a study design or quantifiable outcome data. Two noncompliance themes were repeated among the publications. First, direct penalties included fines, civil actions, loss of licensure, and, potentially, criminal charges. Second, noncompliance also resulted in indirect costs such as employee mistrust and lowered standards of care, which jeopardize on-site health centers' ability to demonstrate a return on investment. Further research with rigorous methodology is needed to inform employer decisions about on-site health services and associated risk management. PMID:22017191

  11. Interim assessment of the VAL automated guideway transit system. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Anagnostopoulos, G.

    1981-11-01

    This report describes an interim assessment of the VAL (Vehicules Automatiques Legers or Light Automated Vehicle) AGT system which is currently under construction in Lille, France, and which is to become fully operational in December 1983. This report contains a technical description and performance data resulting from a demonstration test program performed concurrently in August 1980. VAL is the first driverless AGT urban system application in France. The system operates at grade, elevated, and in tunnels on an exclusive concrete dual-lane guideway that is 12.7 kilometers long. The configuration of the system is a push-pull loop operating between 17 on-line stations. The system is designed to provide scheduled operation at 60-second headways and a normal one-way capacity of 7440 passengers per hour per direction with 55 percent of the passengers seated. Two pneumatic-tired vehicles are coupled into a single vehicle capable of carrying 124 passengers at line speeds of 60 km/hr. During the course of the demonstration test program, VAL demonstrated that it could achieve high levels of dependability and availability and could perform safely under all perceivable conditions.

  12. Verification of the new ECMWF ERA-Interim reanalysis over France

    Science.gov (United States)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2011-02-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 27%. A GPCP-corrected version of ERA-Interim is less biased (13%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6 Wm-2, ERA-Interim overestimates the ISR by 10 Wm-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  13. Verification of the new ECMWF ERA-Interim reanalysis over France

    Directory of Open Access Journals (Sweden)

    C. Szczypta

    2011-02-01

    Full Text Available An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid is performed over France, based on the high resolution (8 km SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR, air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 27%. A GPCP-corrected version of ERA-Interim is less biased (13%. The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6 Wm−2, ERA-Interim overestimates the ISR by 10 Wm−2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  14. Verification of the new ECMWF ERA-Interim reanalysis over France

    Directory of Open Access Journals (Sweden)

    C. Szczypta

    2010-09-01

    Full Text Available An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid is performed over France, based on the high resolution (8 km SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR, air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 26%. A GPCP-corrected version of ERA-Interim is less biased (10–15%. The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6–8 W m−2, ERA-Interim overestimates the ISR by 9–10 W m−2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  15. Assessment report of research and development activities. Activity: advanced science research' (Interim report)

    International Nuclear Information System (INIS)

    Japan Atomic Energy Agency (hereinafter referred to as 'JAEA') consults an assessment committee, 'Evaluation Committee of Research Activities for Advanced Science Research' (hereinafter referred to as 'Committee') for interim assessment of 'Advanced Science Research,' in accordance with General Guideline for the Evaluation of Government Research and Development (R and D) Activities' by Cabinet Office, Government of Japan, 'Guideline for Evaluation of R and D in Ministry of Education, Culture, Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by JAEA. In response to the JAEA's request, the Committee assessed the research program of the Advanced Science Research Center (hereinafter referred to as 'ASRC') during the period of two years from October 2005 to September 2007. The Committee evaluated the management and research activities of the ASRC based on the explanatory documents prepared by the ASRC, the oral presentations with questions-and-answers by the Director and the research group leaders, and interviews from group members through on-site visits by the Committee members. One CD-ROM is attached as an appendix. (J.P.N.)

  16. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    International Nuclear Information System (INIS)

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  17. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  18. Rosiglitazone evaluated for cardiovascular outcomes--an interim analysis

    DEFF Research Database (Denmark)

    Home, Philip D; Pocock, Stuart J; Beck-Nielsen, Henning;

    2007-01-01

    group). The primary end point was hospitalization or death from cardiovascular causes. RESULTS: Because the mean follow-up was only 3.75 years, our interim analysis had limited statistical power to detect treatment differences. A total of 217 patients in the rosiglitazone group and 202 patients......BACKGROUND: A recent meta-analysis raised concern regarding an increased risk of myocardial infarction and death from cardiovascular causes associated with rosiglitazone treatment of type 2 diabetes. METHODS: We conducted an unplanned interim analysis of a randomized, multicenter, open...... in the control group had the adjudicated primary end point (hazard ratio, 1.08; 95% confidence interval [CI], 0.89 to 1.31). After the inclusion of end points pending adjudication, the hazard ratio was 1.11 (95% CI, 0.93 to 1.32). There were no statistically significant differences between the rosiglitazone...

  19. Terrestrial gravity data analysis for interim gravity model improvement

    Science.gov (United States)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  20. 105-H Reactor Interim Safe Storage Project Final Report

    International Nuclear Information System (INIS)

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D and D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  1. Waste Encapsulation and Storage Facility interim operational safety requirements

    CERN Document Server

    Covey, L I

    2000-01-01

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  2. Species management in aquatic habitats WRc RD Interim 1997

    OpenAIRE

    1997-01-01

    This is the Species management in aquatic Habitats WRc Interim 1997 document produced by the Environment Agency in 1997. This document reports progress on R&D Project 640, which aims to provide information on species of conservation value of particular relevance to the Environment Agency, in relation to its activities affecting aquatic environments. A range of stand-alone outputs is being produced, comprising Species Action Plans, practical management guidelines for Agency staff and third par...

  3. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  4. Loss of approval for interim storage by time schedule

    International Nuclear Information System (INIS)

    The Act ''Gesetz zur Suche und Auswahl eines Standortes fuer ein Endlager fuer Waerme entwickelnde radioaktive Abfaelle'' on the search and selection of a site for a repository for heat-generating radioactive waste as also other acts insert a new topic for interim site storage. The operation should be restricted for 40 years. This part of the act is analysed with respect to future requirements for the storage of waste.

  5. Penalty Inflation Adjustments for Civil Money Penalties. Interim Final Rule.

    Science.gov (United States)

    2016-06-27

    In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990, as amended by the Debt Collection Improvement Act of 1996, and further amended by the Bipartisan Budget Act of 2015, section 701: Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015, this interim final rule incorporates the penalty inflation adjustments for the civil money penalties contained in the Social Security Act PMID:27373014

  6. 105-H Reactor Interim Safe Storage Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    E.G. Ison

    2008-11-08

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  7. Interim data report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Vahlund, Fredrik [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Andersson, Johan [JA Streamflow AB, Aelvsjoe (Sweden)

    2004-08-01

    This document is the interim data report in the project SR-Can. The purpose of the data report is to present input data, with uncertainty estimates, for the SR-Can assessment calculations. Besides input data, the report also describes the standardised procedures used when deriving the input data and the corresponding uncertainty estimates. However, in the present interim version of the report (written in the initial stage of the project when site characterisation has yet not been completed) the standardised procedures have not been possible to apply for most of the data and, in order to present a compilation of the data used in the assessment, much of the input data is presented without following the standardised procedures. This will however be changed for the final version of the SR-Can data report, in order to show the methodology that will be used in the final version one example of how input data will be presented is included (migration data for buffer) . The recommended input data for the assessment calculations are, for the interim version, mainly based on SR 97 Beberg data, these are merely presented without any background or uncertainty discussion (this is presented in the SR 97 data report)

  8. Interim Dry Storage of Spent Fuel in Casks

    International Nuclear Information System (INIS)

    French option for the back end of the fuel cycle is reprocessing of used fuel and recycling the fissile material, except some very specific fuel stored in vaults (dry conditions). Used fuel management solutions studied by AREVA for various countries allow for either direct transport to the reprocessing plant, or interim storage and transport after storage of used fuel. Interim storage solutions are wet storage or dry storage (DSC, metal casks or vault systems). When the decision on used fuel management has been postponed, some extension of interim storage duration is considered, therefore it becomes necessary to study used fuel and cask material behaviour and deterioration mechanisms. One objective of this R&D was to review research efforts on spent fuel behaviour and Dry storage experience in casks. Particularly we were interested in the assessment of retrievability of fuel after storage for further use. A review therefore, was made of the effect of storage time/ temperatures and of loading/ drying operation on used fuel integrity. R&D programmes were also carried out on the evaluation of cask materials in long term, especially materials susceptible to degradation

  9. On-site disposal as a decommissioning strategy

    International Nuclear Information System (INIS)

    On-site disposal is not a novel decommissioning strategy in the history of the nuclear industry. Several projects based on this strategy have been implemented. Moreover, a number of studies and proposals have explored variations within the strategy, ranging from in situ disposal of entire facilities or portions thereof to disposal within the site boundary of major components such as the reactor pressure vessel or steam generators. Regardless of these initiatives, and despite a significant potential for dose, radioactive waste and cost reduction, on-site disposal has often been disregarded as a viable decommissioning strategy, generally as the result of environmental and other public concerns. Little attention has been given to on-site disposal in previous IAEA publications in the field of decommissioning. The objective of this report is to establish an awareness of technical factors that may or may not favour the adoption of on-site disposal as a decommissioning strategy. In addition, this report presents an overview of relevant national experiences, studies and proposals. The expected end result is to show that, subject to safety and environmental protection assessment, on-site disposal can be a viable decommissioning option and should be taken into consideration in decision making

  10. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  11. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    Energy Technology Data Exchange (ETDEWEB)

    CALMUS, R.B.

    1999-05-18

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward.

  12. Effect of polyester fiber reinforcement on the mechanical properties of interim fixed partial dentures

    OpenAIRE

    N. Gopichander; K.V. Halini Kumarai; Vasanthakumar, M

    2015-01-01

    Background: Different reinforcements currently available for interim fixed partial denture (FPD) materials do not provide the ideal strength for long-term use. Therefore, the aim of this investigation was to develop a more ideal provisional material for long-term use with better mechanical properties. This study evaluated the effectiveness of polyester fiber reinforcement on different interim FPD materials. Methods: Thirty resin-bonded FPDs were constructed from three provisional interim F...

  13. High level waste interim storge architecture selection - decision report

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B.

    1996-09-27

    The U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford Site tank waste treatment and immobilization services using privatized facilities (RL 1996a). This plan contains a two-phased approach. Phase I is a proof-of-principle/connnercial demonstration- scale effort and Phase II is a fiill-scale production effort. In accordance with the planned approach, interim storage and disposal of various products from privatized facilities are to be DOE fumished. The high-level waste (BLW) interim storage options, or alternative architectures, were identified and evaluated to provide the framework from which to select the most viable method of Phase I BLW interim storage (Calmus 1996). This evaluation, hereafter referred to as the Alternative Architecture Evaluation, was performed to established performance and risk criteria (technical merit, cost, schedule, etc.). Based on evaluation results, preliminary architectures and path forward reconunendations were provided for consideration in the architecture decision- maldng process. The decision-making process used for selection of a Phase I solidified BLW interim storage architecture was conducted in accordance with an approved Decision Plan (see the attachment). This decision process was based on TSEP-07,Decision Management Procedure (WHC 1995). The established decision process entailed a Decision Board, consisting of Westinghouse Hanford Company (VY`HC) management staff, and included appointment of a VTHC Decision Maker. The Alternative Architecture Evaluation results and preliminary recommendations were presented to the Decision Board members for their consideration in the decision-making process. The Alternative Architecture Evaluation was prepared and issued before issuance of @C-IP- 123 1, Alternatives Generation and Analysis Procedure (WI-IC 1996a), but was deemed by the Board to fully meet the intent of WHC-IP-1231. The Decision Board members concurred with the bulk of the Alternative Architecture

  14. Experiences with on-site power sources at KCB

    International Nuclear Information System (INIS)

    The design of the nuclear power station is of the late sixties. The experiences with the on-site power sources, signal processing and some of the resulting modifications of the design of the power plant are mentioned. In order to let the design satisfy as much as possible present ideas about safety, it was decided to realize a total new and Independent decay heat removal System. With this system a second independent on-site power System is at disposal in case of accident situations. (author)

  15. Interim rules amending ERISA disclosure requirements for group health plans--DoL. Interim rules with request for comments.

    Science.gov (United States)

    1997-04-01

    This document contains interim rules governing the content of the summary plan description (SPD) for group health plans, the furnishing of summaries of material reductions in covered services or benefits by group health plans, and the disclosure of SPD and related information through electronic media. The rules contained in this document implement amendments to the disclosure provisions of the Employee Retirement Income Security Act of 1974 (ERISA) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). Interested persons are invited to submit comments on the interim rules for consideration by the Department in developing final rules. The rules contained in this document are being adopted on an interim basis to accommodate statutorily established time frames intended to ensure that sponsors and administrators of group health plans, as well as participants and beneficiaries covered by such plans, have timely guidance concerning compliance with the recently enacted amendments to ERISA. PMID:10166825

  16. BWR Spent Nuclear Fuel Integrity Research and Development Survey for UKABWR Spent Fuel Interim Storage

    International Nuclear Information System (INIS)

    The objective of this report is to identify issues and support documentation and identify and detail existing research on spent fuel dry storage; provide information to support potential R&D for the UKABWR (United Kingdom Advanced Boiling Water Reactor) Spent Fuel Interim Storage (SFIS) Pre-Construction Safety Report; and support development of answers to questions developed by the regulator. Where there are gaps or insufficient data, Oak Ridge National Laboratory (ORNL) has summarized the research planned to provide the necessary data along with the schedule for the research, if known. Spent nuclear fuel (SNF) from nuclear power plants has historically been stored on site (wet) in spent fuel pools pending ultimate disposition. Nuclear power users (countries, utilities, vendors) are developing a suite of options and set of supporting analyses that will enable future informed choices about how best to manage these materials. As part of that effort, they are beginning to lay the groundwork for implementing longer-term interim storage of the SNF and the Greater Than Class C (CTCC) waste (dry). Deploying dry storage will require a number of technical issues to be addressed. For the past 4-5 years, ORNL has been supporting the U.S. Department of Energy (DOE) in identifying these key technical issues, managing the collection of data to be used in issue resolution, and identifying gaps in the needed data. During this effort, ORNL subject matter experts (SMEs) have become expert in understanding what information is publicly available and what gaps in data remain. To ensure the safety of the spent fuel under normal and frequent conditions of wet and subsequent dry storage, intact fuel must be shown to: 1.Maintain fuel cladding integrity; 2.Maintain its geometry for cooling, shielding, and subcriticality; 3.Maintain retrievability, and damaged fuel with pinhole or hairline cracks must be shown not to degrade further. Where PWR (pressurized water reactor) information is

  17. BWR Spent Nuclear Fuel Integrity Research and Development Survey for UKABWR Spent Fuel Interim Storage

    Energy Technology Data Exchange (ETDEWEB)

    Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Mertyurek, Ugur [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Belles, Randy [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Scaglione, John M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-10-01

    The objective of this report is to identify issues and support documentation and identify and detail existing research on spent fuel dry storage; provide information to support potential R&D for the UKABWR (United Kingdom Advanced Boiling Water Reactor) Spent Fuel Interim Storage (SFIS) Pre-Construction Safety Report; and support development of answers to questions developed by the regulator. Where there are gaps or insufficient data, Oak Ridge National Laboratory (ORNL) has summarized the research planned to provide the necessary data along with the schedule for the research, if known. Spent nuclear fuel (SNF) from nuclear power plants has historically been stored on site (wet) in spent fuel pools pending ultimate disposition. Nuclear power users (countries, utilities, vendors) are developing a suite of options and set of supporting analyses that will enable future informed choices about how best to manage these materials. As part of that effort, they are beginning to lay the groundwork for implementing longer-term interim storage of the SNF and the Greater Than Class C (CTCC) waste (dry). Deploying dry storage will require a number of technical issues to be addressed. For the past 4-5 years, ORNL has been supporting the U.S. Department of Energy (DOE) in identifying these key technical issues, managing the collection of data to be used in issue resolution, and identifying gaps in the needed data. During this effort, ORNL subject matter experts (SMEs) have become expert in understanding what information is publicly available and what gaps in data remain. To ensure the safety of the spent fuel under normal and frequent conditions of wet and subsequent dry storage, intact fuel must be shown to: 1.Maintain fuel cladding integrity; 2.Maintain its geometry for cooling, shielding, and subcriticality; 3.Maintain retrievability, and damaged fuel with pinhole or hairline cracks must be shown not to degrade further. Where PWR (pressurized water reactor) information is

  18. Number of on-site personnel and their functions

    International Nuclear Information System (INIS)

    After the definition of the general tasks, the development of an organization chart for on-site personnel is shown, the number and qualifications are indicated relating to the specific jobs. The functions of the different people are explained in detail. (orig.)

  19. Environmental survey of two interim dumpsites, Middle Atlantic Bight from 05 November 1973 to 10 November 1973 (NODC Accession 7501280)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A second oceanographic survey cruise was made to an interim municipal sludge dumpsite and initially to an interim dumpsite for the disposal of industrial acid waste...

  20. Decommissioning costs of WWER-440 nuclear power plants. Interim report: Data collection and preliminary evaluations

    International Nuclear Information System (INIS)

    comparison of data. As a result, the cost figures were collected in a recommended structure and analysed. During progress of work, experts of participating Member States responded to a questionnaire, and explained the contents of individual cost items and cost groups during subsequent discussions. Comparison of cost estimates in the various decommissioning projects showed to be rather difficult, even with the support of the standardised list of items for costing purposes. In each country, the existing cost figures were many times allocated to different cost codes, and it was difficult to re-allocate costs that were grouped based on the individual costing methodologies. Verification of cost figures was sometimes executed while comparing with previous IAEA as well as OECD/NEA studies. The total costs for the immediate decommissioning option vary from 219 MUSD (Finland) to 1,370 MUSD (Germany). This large difference is mainly due to country and site specific conditions. In the case of Finland the possibility for on-site disposal of all dismantled material reduces the costs dramatically. In the case of the Greifswald project (Germany) major costs for post-operational and site support activities, as well as the construction of a large interim storage on the site are included. For the safe enclosure option the cost figures vary from 210 MUSD (Czech Republic) to 469 MUSD (Hungary). In this case the spread in the cost estimations is smaller, but still significant, the reason for this being the different scopes that are included. At this stage of cost estimating in the participating countries, overall comparisons seem to be premature and it is necessary to look at the detail of each cost item. Comparing the cost categories Labour Costs; Capital, Equipment and Material Costs; and Expenses has demonstrated that labour represents about 50 % of the total decommissioning costs. Comparing these results with former OECD/NEA cost studies shows quite good agreement. It may be concluded

  1. An Interim Report on NASA's Draft Space Technology Roadmaps

    Science.gov (United States)

    2011-01-01

    NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13

  2. Summary Interim Report on Findings and Interim Themes from Phase 1 of the review of Allied Health Professions (AHP) support for children/young people with a statement of special educational needs (SEN)

    OpenAIRE

    Public Health Agency

    2015-01-01

    Summary Interim Report on Findings and Interim Themes from Phase 1 of the review of Allied Health Professions (AHP) support for children/young people with a statement of special educational needs (SEN)This interim report is outlining the service principles agreed by the Project Board and the themes identified throughout engagement and information gathering.

  3. Interim Financial Reporting in the Perspective of harmonization of the Romanian Accountancy with the International Financial Reporting Standards

    OpenAIRE

    Bunea-Bontas, Cristina Aurora

    2007-01-01

    The main objective of the interim financial reporting is to present, timely and regularly, information concerning the enterprise’s capacity to generate earnings and cash flows and its financial position and liquidity. International Accounting Standard 34 “Interim Financial Reporting” concerns the financial statements for an interim period. According to IAS 34, the interim financial report includes a complete or condensed set of financial statements, elaborated for a shorter period than a full...

  4. The Effect of Incorporation, Orientation and Silane Treatment of Glass Fibers on the Fracture Resistance of Interim Fixed Partial Dentures

    OpenAIRE

    Basant, Gupta; Reddy, Y G

    2011-01-01

    Fracture of interim fixed partial dentures (FPD) is of important concern to the dental surgeon, especially with long-span fixed partial dentures or areas of heavy occlusal stress. Polymers used in interim FPDs, reinforced with glass fibers have shown to have a positive effect on the fracture resistance of interim FPDs. Since little research has been done on the influence of silane treated glass fibers on the fracture resistance of interim FPDs, this study was conducted to evaluate the effect ...

  5. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... of each contract period. The forecast must be based on financial and statistical data and records... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating...

  6. Interim storage of wastes and refuse derived fuels; Zwischenlagerung von Abfaellen und Ersatzbrennstoffen

    Energy Technology Data Exchange (ETDEWEB)

    Thome-Kozmiensky, K.J.; Versteyl, A.; Beckmann, M. (eds.)

    2006-07-01

    Authors comment on interim storage of municipal wastes and refuse derived fuels. Topics of the 16 contributions are: Logistics and engineering, planning, estimation of storage time, cost and commitment, amend ment of the regulations, penal risks of interim storage, material flow management at waste incinerators, fire prevention, environmental risk, insurances. (uke)

  7. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  8. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-06-02

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  9. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  10. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    International Nuclear Information System (INIS)

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis

  11. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Science.gov (United States)

    2013-07-03

    ... COMMISSION Draft Spent Fuel Storage and Transportation Interim Staff Guidance AGENCY: Nuclear Regulatory... Regulatory Commission (NRC) requests public comment on Draft Spent Fuel Storage and Transportation Interim... given in NUREG-1927 ``Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System...

  12. Effects of Interim Assessments across the Achievement Distribution: Evidence From an Experiment

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2016-01-01

    We use data from a large-scale experiment conducted in Indiana in 2009-2010 to examine the impact of two interim assessment programs (mCLASS and Acuity) across the mathematics and reading achievement distributions. Specifically, we focus on whether the use of interim assessments has a particularly strong effect on improving outcomes for low…

  13. 32 CFR 643.36 - Policy-Interim leasing of excess properties to facilitate economic readjustment.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Policy-Interim leasing of excess properties to facilitate economic readjustment. 643.36 Section 643.36 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE Policy § 643.36 Policy—Interim leasing of...

  14. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  15. Performance of ERA-Interim wave data in the nearshore waters around India

    Digital Repository Service at National Institute of Oceanography (India)

    SanilKumar, V.; Naseef, T.M.

    the Interim European Centre for Medium-Range Weather Forecasts (ECMWF) Re-Analysis [ERA-Interim (ERA-I)] wave height and period data in the nearshore waters around India. The difference between the ERA-I significant wave height (SWH) and the buoy SWH varies...

  16. 76 FR 59394 - Energy Conservation Program for Consumer Products: Publication of the Extension of Interim Waiver...

    Science.gov (United States)

    2011-09-26

    ... multiple defrost cycles, and requested comments on Samsung's petition. 76 FR 16760 (March 25, 2011... comment period on its interim final rule for the refrigerator test procedure. 76 FR 57612 (Sept. 15, 2011...: Publication of the Extension of Interim Waiver Granted to Samsung Electronics America, Inc. From...

  17. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    Energy Technology Data Exchange (ETDEWEB)

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  18. Hanford low-level tank waste interim performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mann, F.M.

    1996-09-16

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single- and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and its performance as early as possible in the project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives.

  19. Hanford low-level tank waste interim performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mann, F.M.

    1997-09-12

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives.

  20. Dosimetry at an interim storage for spent nuclear fuel.

    Science.gov (United States)

    Králík, M; Kulich, V; Studeny, J; Pokorny, P

    2007-01-01

    The Czech nuclear power plant Dukovany started its operation in 1985. All fuel spent from 1985 up to the end of 2005 is stored at a dry interim storage, which was designed for 60 CASTOR-440/84 casks. Each of these casks can accommodate 84 fuel assemblies from VVER 440 reactors. Neutron-photon mixed fields around the casks were characterized in terms of ambient dose equivalent measured by standard area dosemeters. Except this, neutron spectra were measured by means of a Bonner sphere spectrometer, and the measured spectra were used to derive the corresponding ambient dose equivalent due to neutrons. PMID:17526479

  1. Dosimetry at an interim storage for spent nuclear fuel.

    Science.gov (United States)

    Králík, M; Kulich, V; Studeny, J; Pokorny, P

    2007-01-01

    The Czech nuclear power plant Dukovany started its operation in 1985. All fuel spent from 1985 up to the end of 2005 is stored at a dry interim storage, which was designed for 60 CASTOR-440/84 casks. Each of these casks can accommodate 84 fuel assemblies from VVER 440 reactors. Neutron-photon mixed fields around the casks were characterized in terms of ambient dose equivalent measured by standard area dosemeters. Except this, neutron spectra were measured by means of a Bonner sphere spectrometer, and the measured spectra were used to derive the corresponding ambient dose equivalent due to neutrons.

  2. Haiti; Interim Poverty Reduction Strategy Paper: Joint Staff Advisory Note

    OpenAIRE

    International Monetary Fund

    2007-01-01

    This Joint Staff Advisory Note focuses on the Interim Poverty Reduction Strategy Paper (I-PRSP) for Haiti. The I-PRSP outlines the main areas of actions envisaged by the authorities to reduce poverty as well as the steps to be undertaken in the preparation of the full Poverty Reduction Strategy. The I-PRSP presents a good diagnostic of the current dimensions of poverty in Haiti. It also covers well the authorities’ macroeconomic objectives and the broad measures necessary to reach these obj...

  3. Republic of Congo; Interim Poverty Reduction Strategy Paper Progress Report

    OpenAIRE

    International Monetary Fund

    2005-01-01

    This paper examines Congo’s Interim Poverty Reduction Strategy Paper (I-PRSP). Congo’s I-PRSP explains the features and causes of poverty in Congo. It provides a short- and medium-term vision of development as well as a strategic orientation for a return to sustainable and equitable growth. The main objective is steady poverty reduction. The choice and implementation of strategic orientations and priority actions in the I-PRSP are consistent with the government’s commitment to rebuilding the ...

  4. Hanford low-level tank waste interim performance assessment

    International Nuclear Information System (INIS)

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives

  5. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Science.gov (United States)

    2012-09-07

    ... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...: Nuclear Regulatory Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate Interim Staff... Final Japan Lessons-Learned Project Directorate (JLD) Interim Staff Guidance (ISG),...

  6. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Science.gov (United States)

    2012-09-07

    ... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...: Nuclear Regulatory Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff... Final Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG),...

  7. On-site early-warning system for Bishkek (Kyrgyzstan

    Directory of Open Access Journals (Sweden)

    Dino Bindi

    2015-04-01

    Full Text Available In this work, the development of an on-site early warning system for Bishkek (Kyrgyzstan is outlined. Several low cost sensors equipped with MEMS accelerometers are installed in eight buildings distributed within the urban area. The different sensing units communicate each other via wireless links and the seismic data are streamed in real-time to the data center using internet. Since each single sensing unit has computing capabilities, software for data processing can be installed to perform decentralized actions. In particular, each sensing unit can perform event detection task and run software for on-site early warning. If a description for the vulnerability of the building is uploaded in the sensing unit, this piece of information can be exploited to introduce the expected probability of damage in the early-warning protocol customized for a specific structure.

  8. The feasibility of mobile computing for on-site inspection.

    Energy Technology Data Exchange (ETDEWEB)

    Horak, Karl Emanuel; DeLand, Sharon Marie; Blair, Dianna Sue

    2014-09-01

    With over 5 billion cellphones in a world of 7 billion inhabitants, mobile phones are the most quickly adopted consumer technology in the history of the world. Miniaturized, power-efficient sensors, especially video-capable cameras, are becoming extremely widespread, especially when one factors in wearable technology like Apples Pebble, GoPro video systems, Google Glass, and lifeloggers. Tablet computers are becoming more common, lighter weight, and power-efficient. In this report the authors explore recent developments in mobile computing and their potential application to on-site inspection for arms control verification and treaty compliance determination. We examine how such technology can effectively be applied to current and potential future inspection regimes. Use cases are given for both host-escort and inspection teams. The results of field trials and their implications for on-site inspections are discussed.

  9. AB005. Genomics on site of detection of malaria

    OpenAIRE

    Sugano, Sumio; Yamagishi, Junya; Mongan, Arthur E.; Tuda, Joesf; Suzuki, Yutaka

    2015-01-01

    Nanopore sequencer, MinION, has enabled sequencing analysis without pre-installation of expensive conventional sequencers or pre-requisite of specific skills in biological experiments. Even electric supply is not always necessary, by connecting MinION to a laptop PC. These features of MinION have opened the opportunity to enable precise genotyping of pathogens on site. In this study, we conducted genotyping of presumed drug resistance-causing SNVs in malaria parasites, Plasmodium falciparum. ...

  10. On-site testing of crop drying fans

    OpenAIRE

    Winkelman, Paul M.

    1988-01-01

    The commercial peanut dryers used today were first conceived when energy was relatively inexpensive. Since then, energy costs have increased significantly, and more efficient peanuts dryers are desirable. To evaluate dryer efficiency, a mobile fan test facility was designed, built and calibrated for on-site fan airflow and energy measurements. Four-, six-, and eight-trailer peanut dryers were tested for performance. The characteristics observed were delivery of fan airflow as compared to m...

  11. Advantages on dry interim storage for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, L.S. [Centro Tecnologico da Marinha em Sao Paulo, Av. Professor Lineu Prestes 2468, 05508-900 Sao Paulo (Brazil); Rzyski, B.M. [IPEN/ CNEN-SP, 05508-000 Sao Paulo (Brazil)]. e-mail: romanato@ctmsp.mar.mil.br

    2006-07-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  12. Glass packages in interim storage; Les verres dans les stockages

    Energy Technology Data Exchange (ETDEWEB)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO{sub 2}. The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ``source term`` models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs.

  13. Climate change : we are at risk : interim report

    International Nuclear Information System (INIS)

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs

  14. Nuclear waste: Is there a need for federal interim storage

    International Nuclear Information System (INIS)

    The Congress created the Monitored Retrievable Storage Review Commission to provide a report on the need for a Federal monitored retrievable storage facility (MRS) as part of the Nation's nuclear waste management system. The Commission concludes that the MRS as presently described in the law, which links the capacity and schedule of operation of the MRS to a permanent geologic repository, cannot be justified. The Commission finds, however, that while no single factor would favor an MRS over the No-MRS option, cumulatively the advantages of an MRS would justify the building of an MRS if: there were no linkages between the MRS and the repository; the MRS could be constructed at an early date; and the opening of the repository were delayed considerably beyond its presently scheduled date of operation. The Commission therefore recommends that the Congress take the following actions: Authorize construction of a Federal Emergency Storage facility with a capacity limit of 2,000 metric tons of uranium; Authorize construction of a User-Funded Interim Storage facility with a capacity limit of 5,000 metric tons of uranium; Reconsider the subject of interim storage by the year 2000

  15. Climate change : we are at risk : interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  16. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996.

  17. Interim FEP report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina (ed.) [Kemakta Konsult AB, Stockholm (Sweden)

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  18. Local Area Artworks: Collaborative Art Interpretation On-Site

    DEFF Research Database (Denmark)

    Polli, Anna Maria; Korn, Matthias; Klokmose, Clemens Nylandsted

    2013-01-01

    In this paper we present Local Area Artworks, a system enabling collaborative art interpretation on-site deployed during an exhibition in a local art gallery. Through the system, we explore ways to re-connect people to the local place by making use of their personal mobile devices as interfaces...... to the shared physical space. We do this by re-emphasizing the local characteristics of wireless networks over the global connectivity to the Internet. With a collaborative writing system in a semi-public place, we encourage local art discussions and provide a platform for the public to actively participate...

  19. On-site hydrogen generation from biodiesel and diesel

    OpenAIRE

    Martin, Stefan

    2015-01-01

    The lack of hydrogen infrastructure and distribution poses an obstacle for the introduction of fuel cell vehicles to the market. Therefore it is reasonable to consider using liquid fuels for on-board or on-site hydrogen generation. Within the FP7 project NEMESIS2+ (01/2012-06/2015, www.nemesis-project.eu) a small-scale hydrogen generator capable of producing 50 Nm3h-1 from biodiesel and diesel is currently being developed. Reduction of hydrogen production costs (< 5.0 € per kg), high overall...

  20. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  1. The On-Site Analysis of the Cherenkov Telescope Array

    CERN Document Server

    Bulgarelli, Andrea; Zoli, Andrea; Aboudan, Alessio; Rodríguez-Vázquez, Juan José; De Cesare, Giovanni; De Rosa, Adriano; Maier, Gernot; Lyard, Etienne; Bastieri, Denis; Lombardi, Saverio; Tosti, Gino; Bergamaschi, Sonia; Beneventano, Domenico; Lamanna, Giovanni; Jacquemier, Jean; Kosack, Karl; Antonelli, Lucio Angelo; Boisson, Catherine; Borkowski, Jerzy; Buson, Sara; Carosi, Alessandro; Conforti, Vito; Colomé, Pep; Reyes, Raquel de los; Dumm, Jon; Evans, Phil; Fortson, Lucy; Fuessling, Matthias; Gotz, Diego; Graciani, Ricardo; Gianotti, Fulvio; Grandi, Paola; Hinton, Jim; Humensky, Brian; Inoue, Susumu; Knödlseder, Jürgen; Flour, Thierry Le; Lindemann, Rico; Malaguti, Giuseppe; Markoff, Sera; Marisaldi, Martino; Neyroud, Nadine; Nicastro, Luciano; Ohm, Stefan; Osborne, Julian; Oya, Igor; Rodriguez, Jerome; Rosen, Simon; Ribo, Marc; Tacchini, Alessandro; Schüssler, Fabian; Stolarczyk, Thierry; Torresi, Eleonora; Testa, Vincenzo; Wegner, Peter

    2015-01-01

    The Cherenkov Telescope Array (CTA) observatory will be one of the largest ground-based very high-energy gamma-ray observatories. The On-Site Analysis will be the first CTA scientific analysis of data acquired from the array of telescopes, in both northern and southern sites. The On-Site Analysis will have two pipelines: the Level-A pipeline (also known as Real-Time Analysis, RTA) and the level-B one. The RTA performs data quality monitoring and must be able to issue automated alerts on variable and transient astrophysical sources within 30 seconds from the last acquired Cherenkov event that contributes to the alert, with a sensitivity not worse than the one achieved by the final pipeline by more than a factor of 3. The Level-B Analysis has a better sensitivity (not be worse than the final one by a factor of 2) and the results should be available within 10 hours from the acquisition of the data: for this reason this analysis could be performed at the end of an observation or next morning. The latency (in part...

  2. Use of leaching chambers for on-site sewage treatment.

    Science.gov (United States)

    St Marseille, J G; Anderson, B C

    2002-03-01

    An innovative chamber system was installed for on-site sewage treatment beneath an active parking lot at a restaurant near Cornwall, Ontario. The configuration of this prototype system used polyethylene leaching chambers over which wastewater was allowed to trickle. The chambers were vented to the surface to provide direct, passive air transfer. This demonstration project was examined as a cost-effective wastewater treatment alternative for a very constrained site. The leaching chambers were installed over a geotextile-covered sand filter bed. Chamber sidewall contact contributed an additional 50% to the total soil contact area hence justification for a footprint reduction. A labile carbon source (sawdust) was added into one half of the bed to encourage dissimilatory denitrification. Average hydraulic loading was 50 l m(-1) day(-1) (5 cm day(-1)). Treatment rates exceeded more than 4 orders of magnitude removal for E. coli; 90% biochemical oxygen demand; ammonium; and 99% total phosphorus. Nitrate-N on the carbon-amended side averaged 0.6 mg l(-1) compared with 8.6 mg l(-1) on the (non-carbon) control side. This project has demonstrated that effective on-site treatment can be accomplished. Flow and load equalization, pulse dosing, chamber venting, phosphorus precipitation, and denitrification were keys to treatment success. Applications include domestic and commercial sites. PMID:11999988

  3. Status of small reactor designs without on-site refuelling

    International Nuclear Information System (INIS)

    There is an ongoing interest in member states in the development and application of small and medium sized reactors (SMRs). In the near term, most new NPPs are likely to be evolutionary designs building on proven systems while incorporating technological advances and often the economics of scale, resulting from the reactor outputs of up to 1600 MW(e). For the longer term, the focus is on innovative designs aiming to provide increased benefits in the areas of safety and security, non-proliferation, waste management, resource utilization and economy, as well as to offer a variety of energy products and flexibility in design, siting and fuel cycle options. Many innovative designs are reactors within the small-to-medium size range, having an equivalent electric power less than 700 MW(e) or even less than 300 MW(e). A distinct trend in design and technology development, accounting for about half of the SMR concepts developed worldwide, is represented by small reactors without on-site refuelling. Such reactors, also known as battery-type reactors, could operate without reloading and shuffling of fuel in the core over long periods, from 5 to 25 years and beyond. Upon the advice and with the support of IAEA member states, within its Programme 1 'Nuclear Power, Fuel Cycle, and Nuclear Science', the IAEA provides a forum for the exchange of information by experts and policy makers from industrialized and developing countries on the technical, economic, environmental, and social aspects of SMRs development and implementation in the 21st century, and makes this information available to all interested Member States by producing status reports and other publications dedicated to advances in SMR technology. The objective of this report is to provide Member States, including those just considering the initiation of nuclear power programmes and those already having practical experience in nuclear power, with a balanced and objective information on important development trends and

  4. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  5. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results

    International Nuclear Information System (INIS)

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show that the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water

  6. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B.; Marshall, D.S.

    1992-06-01

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show that the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water.

  7. Interim sanitary landfill groundwater monitoring report. 1995 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Bagwell, L.

    1996-04-24

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled biannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500- 1120 (formerly DWP-087A) and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane was elevated in one downgradient and one sidegradient well during 1995. Barium, 1, 1- dichloroethylene, specific conductance, and zinc exceeded standards in one well each. The elevated level of 1, 1-dichloroethylene occurred in a downgradient well. The groundwater flow direction in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 190 ft/year during first quarter 1995 and 150 ft/yr during third quarter 1995.

  8. Provisional materials: key components of interim fixed restorations.

    Science.gov (United States)

    Perry, Ronald D; Magnuson, Britta

    2012-01-01

    Clinicians have many choices of provisional materials from which to choose when fabricating interim fixed restorations. While traditional materials are still in use today, temporary materials are continuously being updated and improved upon. In addition to the functional necessities required of the provisional material, it must also provide esthetic value for the patient. This article provides an overview of provisional materials, including newer bis-acryls that have helped eliminate some of the challenges associated with traditional acrylic materials. Composite resin preformed crowns for single-unit provisional applications are also discussed, along with CAD/CAM-fabricated materials. Regardless of the material selected, a provisional restoration must maintain and protect the underlying tooth structure from ill effects. PMID:22432178

  9. Licensing Procedures for Interim Storage of Spent Fuel in Germany

    International Nuclear Information System (INIS)

    In accordance with the waste management concept in Germany spent fuel is stored in interim storage facilities for 40 years until disposal in a geological repository. The storage concept bases on dry storage of the spent fuel in metallic transport and storage casks, standing upright in halls of reinforced concrete. Storage of spent fuel as well as significant modifications of the storage require a license according to art. 6 of the Atomic Energy Act. The Federal Office for Radiation Protection (Bundesamt für Strahlenschutz - BfS) is the competent licensing authority. The mode of the licensing procedure — whether formalized or non-formalized — depends on the necessity to carry out an environmental impact assessment. Formalized licensing procedures include a public participation procedure. In the following, the licensing prodecures are illustrated and a short overview over the current licensing procedures conducted by BfS is given. (author)

  10. Interim report - geotechnical site assessment methodology. Vol.1

    International Nuclear Information System (INIS)

    An interim report summarizing the research conducted on geotechnical site assessment methodology at the Carwynnen test mine in Cornwall. The geological setting of the test site in the Cornubian granite batholith is described. The effect of structure imposed by discontinuities on the engineering behaviour of rock masses is discussed and the scanline survey method of obtaining data on discontinuities in the rock mass is described. The requirement for remote geophysical methods of characterizing the mass is discussed and initial experiments using seismic and ultrasonic velocity measurements are reported. Computer programs to perform statistical analysis of the discontinuity patterns are described. Overcoring and hydraulic fracturing methods of determining the in-situ stress are briefly described and the results of a programme of in-situ stress measurements using the overcoring method are reported. (author)

  11. Corrosion behaviour of metallic containers during long term interim storages

    International Nuclear Information System (INIS)

    Two main corrosion phenomena are encountered in long term interim storage conditions: dry oxidation by the air when the temperature of high level nuclear wastes containers is high enough (roughly higher than 100 C) and corrosion phenomena as those encountered in outdoor atmospheric corrosion when the temperature of the container wall is low enough and so condensation is possible on the container walls. Results obtained with dry oxidation in air lead to predict small damages (less than 1μm on steels over 100 years at 100 C) and no drastic changes with pollutants. For atmospheric corrosion, first developments deal with a pragmatic method that gives assessments of the indoor atmospheric corrosivities. (author)

  12. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Charles R. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Enos, David G. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  13. Advanced nuclear reactor public opinion project. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  14. Interim Site Assessment and Clean-up Guidebook

    International Nuclear Information System (INIS)

    In April 1995 an Interim Site Investigation and Clean-up Guidebook (for petroleum hydrocarbon and volatile organic compound impacted sites) was developed for public use. The purpose of the Guidebook was to offer a new approach to the site cleanup process: one that reduces time, cuts costs, and establishes a defined endpoint for investigations and cleanup actions. The Guidebook provided a matrix to screen for low-risk contaminated sites. After a year of use, the Guidebook was revised in May 1996. The most notable change was in the Petroleum Hydrocarbon Section and the modification of the screening table for petroleum hydrocarbon contaminated sites. The changes considered the strong influence of lithology on contaminant transport and recognized the large attenuation of the long chain, heavy oil and tar, hydrocarbons in soils

  15. T Tank Farm Interim Cover Test - Design Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Keller, Jason M.

    2006-07-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  16. Recommended alternative for interim stabilization of Tank 241-C-103

    Energy Technology Data Exchange (ETDEWEB)

    Dukelow, G.T.; Turner, D.A. [Westinghouse Hanford Co., Richland, WA (United States); Grigsby, J.M.

    1995-04-01

    The waste in tank 241-C-103 poses several health and safety risks and potential soil contamination caused by tank leaks. To minimize the risk of contaminating the soil beneath the tank, the pumpable waste liquids are planned to be removed by salt well pumping. In addition to aqueous liquids, this tank is unique because it also contains a layer of degraded PUREX solvent floating on the aqueous liquid. The following three options for removing and storing this separable phase organic solvent have been proposed and studied: transferring the organic solvent and pumpable aqueous liquids using existing salt well pumping equipment and procedures to a double-shell tank (DST) for storage; removing most of the organic solvent using a skimmer pump, then salt well pumping the remaining pumpable liquids to a different DST for storage; removing most of the organic solvent to an aboveground storage tank for eventual treatment or offsite transfer, and then salt well pumping the remaining pumpable liquids to a DST for interim storage. As a result of evaluating these three options and a no pumping option, the recommended action is to transfer both the organic solvent and pumpable aqueous liquid to a DST for storage using existing salt well pumping equipment. The evaluation considers the following criteria: public health and safety, worker safety, environmental compliance, engineering feasibility, and cost. The options compared these factors. Two key areas drove the selection of the recommended approach: the minimization of potential soil contamination from tank leaks caused the (interim stabilization by salt well pumping) options to be rated more highly than the no pumping option; and cost and implementation factors caused the transfer and storage to DST using existing tank farm salt well pumping equipment option to rate higher than the skimming options. Other factors have only a second order effect on the selection process. Evaluation results are described in this report.

  17. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  18. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  19. Intra-Service Section 7 Evaluation Consultation/Conference/Concurrence : Walnut Creek NWR Interim Hunting Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Section 7 Evaluation for the Neal Smith NWR Interim Hunting Plan states that the hunting program is not likely to adversely affect listed species on the...

  20. Big Oaks National Wildlife Refuge : Environmental Action Statement, Environmental Assessment, Interim Hunting and Fishing Plan : 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains the Environmental Action Statement, Environmental Assessment, and Interim Hunting and Fishing Plan for Big Oaks National Wildlife Refuge from...

  1. Basis for Interim Operation for the K-Reactor in Cold Standby

    International Nuclear Information System (INIS)

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993)

  2. Interim report for defining brine and oil threats in the Patoka River National Wildlife Refuge [2002

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following interim report is a list of activities being performed in conjunction with the study of oil brine effects on crayfish in the Patoka River National...

  3. Interim report for defining brine and oil threats in the Patoka River National Wildlife Refuge [2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following interim report is a list of activities being performed in conjunction with the study of oil brine effects on crayfish in the Patoka River National...

  4. Flammable gas deflagration consequence calculations for the tankwaste remediation system basis for interim operation

    Energy Technology Data Exchange (ETDEWEB)

    Van Vleet, R.J., Westinghouse Hanford

    1996-09-23

    This paper calculates the radiological dose consequences and the toxic exposures for deflagration accidents at various Tank Waste Remediation System facilities. These will be used in support of the Tank Waste Remediation System Basis for Interim Operation.

  5. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    International Nuclear Information System (INIS)

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  6. LANDFILLS AS BIOREACTORS: RESEARH AT THE OUTER LOOP LANDFILL, LOUISVILLE, KENTUCKY; FIRST INTERIM REPORT

    Science.gov (United States)

    Interim report resulting from a cooperative research and development agreement (CRADA) between US EP A's Officeof Research and Development - National Risk Management Research Laboratory and a n ongoing field demonstrationof municipal waste landfills being operated as bioreact...

  7. Decommissioning and dismantling of nuclear reactors and nuclear spent fuel interim storage in Germany

    International Nuclear Information System (INIS)

    The authors visited Germany in April 2013 to investigate state of reactor decommissioning and dismantling and interim storage of spent fuels reflecting nuclear power phaseout policy after the Fukushima accident. They visited interim storage facilities of radioactive wastes (ZLN, Zwischenlanger Nord) and central active workshop (ZAW, Zentrale Aktive Werkstatt) at Greifswald, and interim storage facilities of spent fuels at Philippsburg. CASTOR (Cask for Storage and Transport of Radioactive Material) was used for interim storage of spent fuels and high-level wastes for 40 years. Amount of wastes produced by decommissioning and dismantling was estimated 1800 ktons consisting of 1200 ktons non-radioactive and 600 ktons radioactive wastes, 500 ktons of which could be decontaminated less than clearance level and 100 ktons of which were obliged to be stored as radioactive wastes. New geological repository site for high level radioactive wastes should be found and developed. (T. Tanaka)

  8. Loke T. Kok named interim dean of College of Agriculture and Life Sciences

    OpenAIRE

    Owczarski, Mark

    2009-01-01

    Loke T. Kok of Blacksburg, professor and head of the Department of Entomology in the College of Agriculture and Life Sciences at Virginia Tech, has been named the college's interim dean effective March 1.

  9. Basis for Interim Operation for the K-Reactor in Cold Standby

    Energy Technology Data Exchange (ETDEWEB)

    Shedrow, B.

    1998-10-19

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

  10. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    Energy Technology Data Exchange (ETDEWEB)

    T. A. Lee

    2005-09-15

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  11. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Science.gov (United States)

    2011-03-18

    ... Improvement Program (AIP): Policy Regarding Access to Airports From Residential Property (75 FR 54946..., Safety Management System for Certificated Airports (75 FR 62008, October 7, 2010). However, the agency... Federal Aviation Administration Airport Improvement Program (AIP): Interim Policy Regarding Access...

  12. CASDAC system: On-Site Multiplexer user's guide

    International Nuclear Information System (INIS)

    The CASDAC (Containment and Surveillance Data Authenticated Communication) system has been developed by JAERI for nuclear safeguards and physical protection of nuclear material. This system is a remote monitoring system for continual verification of security and safeguards status of nuclear material. The CASDAC system consists of two subsystems, one of them is a Grand Command Center (GCC) subsystem and the other is a facility subsystem. This report describes the outline and usage of the On-Site Multiplexer (OSM), which controls all other equipments in a facility subsystem and communicates with the GCC. This work has been carried out in the framework of Japan Support Programme for Agency Safeguards (JASPAS) as a project, JA-1. (author)

  13. Greenhouse gas emissions from on-site wastewater treatment systems

    Science.gov (United States)

    Somlai-Haase, Celia; Knappe, Jan; Gill, Laurence

    2016-04-01

    Nearly one third of the Irish population relies on decentralized domestic wastewater treatment systems which involve the discharge of effluent into the soil via a percolation area (drain field). In such systems, wastewater from single households is initially treated on-site either by a septic tank and an additional packaged secondary treatment unit, in which the influent organic matter is converted into carbon dioxide (CO2) and methane (CH4) by microbial mediated processes. The effluent from the tanks is released into the soil for further treatment in the unsaturated zone where additional CO2 and CH4 are emitted to the atmosphere as well as nitrous oxide (N2O) from the partial denitrification of nitrate. Hence, considering the large number of on-site systems in Ireland and internationally, these are potential significant sources of greenhouse gas (GHG) emissions, and yet have received almost no direct field measurement. Here we present the first attempt to quantify and qualify the production and emissions of GHGs from a septic tank system serving a single house in the County Westmeath, Ireland. We have sampled the water for dissolved CO2, CH4 and N2O and measured the gas flux from the water surface in the septic tank. We have also carried out long-term flux measurements of CO2 from the drain field, using an automated soil gas flux system (LI-8100A, Li-Cor®) covering a whole year semi-continuously. This has enabled the CO2 emissions from the unsaturated zone to be correlated against different meteorological parameters over an annual cycle. In addition, we have integrated an ultraportable GHG analyser (UGGA, Los Gatos Research Inc.) into the automated soil gas flux system to measure CH4 flux. Further, manual sampling has also provided a better understanding of N2O emissions from the septic tank system.

  14. Will interim storage sites become ultimate storage sites?; Werden aus Zwischenlager Endlager?

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, W.P. [ia GmbH - Wissensmanagement und Ingenieurleistungen, Muenchen (Germany)

    2007-07-01

    According to a Prognos study, the maximum interim storage capacity required in Germany in 2008 will be 4 - 5 million cubic metres. Interim storage is necessary because there are not sufficient options for disposal. The stored waste will be combusted, so that German incinerators will be capable of running at full capacity until 2013. From mere disposal systems, incinerators are rapidly becoming waste-to-energy systems that will make a contribution to power supply. (orig.)

  15. Verification of the new ECMWF ERA-Interim reanalysis over France

    OpenAIRE

    Szczypta, C; J.-C. Calvet; Albergel, C.; Balsamo, G.; S. Boussetta; D. Carrer; S. Lafont; Meurey, C.

    2010-01-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-I...

  16. Verification of the new ECMWF ERA-Interim reanalysis over France

    OpenAIRE

    Szczypta, C; Calvet, J.-C.; Albergel, C.; Balsamo, G.; S. Boussetta; D. Carrer; S. Lafont; Meurey, C.

    2011-01-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-I...

  17. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  18. Effect of Interim Annealing on Mechanical Strength of TFA-MOD Derived YBCO Coated Conductors

    Science.gov (United States)

    Takagi, Y.; Nakaoka, K.; Nakamura, T.; Yoshizumi, M.; Kiss, T.; Izumi, T.; Shiohara, Y.

    TFA-MOD derived YBCO tapes are expected for many applications due to cost-efficiency. In some applications, uniformity and mechanical strength are required for tapes. A 205 m-long YBCO tape was fabricated with high and uniform Ic performance throughout the tape by adopting the interim annealing before the conversion process. The effect of the interim annealing on the crystal growth mechanism of YBCO has been studied focusing on the relationship between the interim annealing conditions and delamination, in this work. Delamination strength was evaluated in the samples prepared with and without interim annealing by the stud pull method. Measurements were carried out on 50 different points for each sample and the results were analyzed statistically. The difference between the two samples was remarkably seen in the delamination strength below 60 MPa. The conventionally annealed sample had more points with low delamination strength below 60 MPa than the interim annealed one. The cross sectional images of both samples observed by SEM showed that there were few pores within the interim annealed superconducting layer, although conventional superconducting layer had many pores. These results suggest that the pores within YBCO layer might be origins to be propagated for delamination at low strength.

  19. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  20. Interim measure work plan/design for Agra, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  1. On-site intermediate storage facilities in Germany

    International Nuclear Information System (INIS)

    Full text: In 2002 German utilities and the federal government agreed on the future of nuclear power in Germany. Part of this 'consensus' are site specific phase out periods, termination of reprocessing and the erection of on-site storage facilities. Shipment of spent fuel to reprocessing plants is only allowed until 2005, shipments to the German joint storage facilities of Ahaus and Gorleben have to be minimized. Each nuclear power plant has to create its own spent fuel storage with appropriate capacity. The necessary storage capacity is about 20 to 40 t/a and per plant, corresponding to 40 to 80 PWR- and 140 to 180 BWR-fuel bundles, depending on plant power and discharge burnup. Wet storage capacity inside the reactor building of most German NPPs was increased (compact storage) when shipments of spent fuel were ceased, following discussions about surface contaminations on casks. To avoid shut-down some plants even built short term storage facilities. Whereas short-term storage is to guarantee undisturbed operation of plants on an intermediate time scale, long term storage - until final nuclear waste disposal after 2030 is available - is also driven by economical considerations. Of the existing storage techniques wet and dry storage were analyzed with respect to costs and time for design, licensing and construction. Both techniques fulfill the safety requirements, but wet storage turns out to be more costly because of the necessary heat removing devices and operating expense. Total costs for construction, operation and decommissioning of a wet storage facility - as it was built in Obrigheim in 1998 on a smaller scale - rank from 80 to 250 million Euro, 1,4 million Euro annually and 45 million Euro for decommissioning (price index of 2003), respectively. Compared to that, dry storage needs about 26 million Euro for construction, annually 0,3 million Euro plus 2 - 3 casks (e.g. of the CASTOR type) with around 1,2 million Euro per flask and about 12 million Euro for

  2. Interim main report of the safety assessment SR-Can

    International Nuclear Information System (INIS)

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10-6 for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8. Hydrogeological

  3. Interim main report of the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Allan (ed.) [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection

  4. Dedicated-site, interim storage of high-level nuclear waste as part of the management system

    OpenAIRE

    Zen, E-an

    1980-01-01

    Dedicated-site interim storage of high-level reprocessed nuclear waste and of spent fuel rods is proposed as a long-term integral part of the systems approach of the national nuclear waste isolation program. Separation of interim sites for retrievable storage from permanent-disposal repositories should enhance ensurance of the performance of the latter; maintenance of retrievability at separate sites also has many advantages in both safety and possible use of waste as resources. Interim stora...

  5. On-site attractive multiorbital Hamiltonian for d -wave superconductors

    Science.gov (United States)

    Bishop, Christopher B.; Liu, Guangkun; Dagotto, Elbio; Moreo, Adriana

    2016-06-01

    We introduce a two-orbital Hamiltonian on a square lattice that contains on-site attractive interactions involving the two eg orbitals. Via a canonical mean-field procedure similar to the one applied to the well-known negative-U Hubbard model, it is shown that the model develops d -wave (B1 g) superconductivity with nodes along the diagonal directions of the square Brillouin zone. This result is also supported by exact diagonalization of the model in a small cluster. The expectation is that this relatively simple attractive model could be used to address the properties of multiorbital d -wave superconductors in the same manner that the negative-U Hubbard model is widely applied to the study of the properties of s -wave single-orbital superconductors. In particular, we show that by splitting the eg orbitals and working at three-quarters filling, such that the x2-y2 orbital dominates at the Fermi level but the 3 z2-r2 orbital contribution is nonzero, the d -wave pairing state found here phenomenologically reproduces several properties of the superconducting state of the high Tc cuprates.

  6. A potentiometric biosensor for rapid on-site disease diagnostics.

    Science.gov (United States)

    Tarasov, Alexey; Gray, Darren W; Tsai, Meng-Yen; Shields, Niall; Montrose, Armelle; Creedon, Niamh; Lovera, Pierre; O'Riordan, Alan; Mooney, Mark H; Vogel, Eric M

    2016-05-15

    Quantitative point-of-care (POC) devices are the next generation for serological disease diagnosis. Whilst pathogen serology is typically performed by centralized laboratories using Enzyme-Linked ImmunoSorbent Assay (ELISA), faster on-site diagnosis would infer improved disease management and treatment decisions. Using the model pathogen Bovine Herpes Virus-1 (BHV-1) this study employs an extended-gate field-effect transistor (FET) for direct potentiometric serological diagnosis. BHV-1 is a major viral pathogen of Bovine Respiratory Disease (BRD), the leading cause of economic loss ($2 billion annually in the US only) to the cattle and dairy industry. To demonstrate the sensor capabilities as a diagnostic tool, BHV-1 viral protein gE was expressed and immobilized on the sensor surface to serve as a capture antigen for a BHV-1-specific antibody (anti-gE), produced in cattle in response to viral infection. The gE-coated immunosensor was shown to be highly sensitive and selective to anti-gE present in commercially available anti-BHV-1 antiserum and in real serum samples from cattle with results being in excellent agreement with Surface Plasmon Resonance (SPR) and ELISA. The FET sensor is significantly faster than ELISA (<10 min), a crucial factor for successful disease intervention. This sensor technology is versatile, amenable to multiplexing, easily integrated to POC devices, and has the potential to impact a wide range of human and animal diseases. PMID:26765531

  7. On-site digital heritage inventory development at Bat, Oman

    Science.gov (United States)

    Kondo, Y.; Miki, T.; Kuronuma, T.; Oguchi, T.

    2015-08-01

    This paper reports on the on-site development of a local-scale digital heritage inventory (DHI) of the Bronze Age site at Bat in the interior of Oman. The goal of this inventory project was to share geospatial and archaeological information of tombs and other built structures with researchers and government agents to conduct cultural heritage management, scientific research, outreach, and education. To this end, the Bat Digital Heritage Inventory (BatDHI) was compiled at the local office by incorporating previous survey records, which were concurrently crosschecked and updated by ground-truth surveys. The current version of the BatDHI was implemented using a combination of a network-access-ready database application, open source geographical information system, and web-based map engine. This system assisted both fieldwork and management works including decision making and planning. This inventory project exemplified a transdisciplinary research, in which researchers and societal stakeholders collaborated for co-design of research agendas, co-production of knowledge, and co-dissemination of outcomes.

  8. On site inspection for nuclear test ban verirication

    Directory of Open Access Journals (Sweden)

    P. D. Marschall

    1994-06-01

    Full Text Available The problem of verifying compliance with a nuclear test ban treaty is mainly a technical one. However the problem of detecting, locating and identifying nuclear explosions has, since the late 1950s, been intimately involved with the political problems associated with negotiating a treaty. In fact there are few other areas in which policy, diplomacy and science have been so interwoven. This paper attempts to illustrate how technology can. be applied to solve some of the political problems which arise when considering the role of an On Site Inspection (OSI to determine whether or not a nuclear explosion, in violation of a treaty, has occurred or not. It is hoped that the reader, with a scientific background, but with little or no experience of treaty negotiations, will gain an. insight as to how technical matters can interact with political requirements. The demands made on scientists to provide technical support for negotiating and rnonitoring compliance of a treaty have increased significanfly over the last 40 years. This is a period in which a number of major treaties have contained a significant technical component e.g. the Limited Test Ban Treaty (Threshold Treaty and the Chemical Weapon Convention. This paper gives an indication of some of the political decisions which will have to be made and suggests some of the technical methods which are of value in the identification of a clandestine nuclear explosion.

  9. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage

  10. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  11. International Programs and Agreements in Geothermal Energy. An Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oppenheimer, M.; Fein, E.; Bye, J.

    1978-06-01

    This report contains the interim results of a study for the Division of Geothermal Energy on the Division's international programs and activities. The complete research program, which is scheduled to be finished i November 1978, will have the following elements: (1) an assessment of objectives that have motivated the formulation of international programs and an explanation of any changes in the evolution of those programs. These objectives will be assessed for their internal consistency, degree of governmental consensus, their practicality, the current status of their accomplishments, and the implications of their accomplishments for the role of DGE. (2) An assessment of organizational structures and teams, including the identity of key decisionmakers, the nature of the interagency process, procedures for generating nongovernmental support for international programs and the success of these procedures, and the effectiveness of the interface with foreign partners. (3) Assessment of results of international cooperative programs, which involve the development of an overall balance sheet of benefits and disbenefits attributed to each international program. (4) The formulation of future international cooperative programs based on the assessments described. These programs may involve the development of new exchanges, alteration or elimination of existing exchanges, and revisions in the management of exchanges by US government agencies.

  12. SWSA 6 interim corrective measures environmental monitoring: FY 1990 results

    Energy Technology Data Exchange (ETDEWEB)

    Ashwood, T.L.; Spalding, B.P.

    1991-07-01

    This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levels in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.

  13. The UN Interim Administration Mission in Kosovo (UNMIK

    Directory of Open Access Journals (Sweden)

    Alfonso J. Iglesias Velasco

    2001-12-01

    Full Text Available The current situation in the Province of Kosovo in the Republic of Serbia within the Yugoslav State became unsustainable in the late 1990´s as a result of the repressive policies of the Serbian authorities toward the Kosovar Albanians. International efforts tofind a peaceful solution to the conflict were unsuccessful, in large measure on account of Serbian intransigence, and the intensification of the conflict with tragic consequences for the Kosovar civilian population led the Atlantic Alliance in the spring of 1999 to a carryout a military intervention of, to say the least, dubious legality under international law, which in turn forced Serbian leaders to bow to the application of the solution worked out by the international community in the Rambouillet Accords and set down in UN Security Council Resolution 1244 (1999 of June 10, 1999. This resolution provided for two international entities in the province, one a security force (KFOR and the other civilian, the UN Interim Administration Mission (UNMIK. This paper analyzes the mission’s mandate and structure as well as the evolution of the peace process.

  14. Database and Interim Glass Property Models for Hanford HLW Glasses

    International Nuclear Information System (INIS)

    The purpose of this report is to provide a methodology for an increase in the efficiency and a decrease in the cost of vitrifying high-level waste (HLW) by optimizing HLW glass formulation. This methodology consists in collecting and generating a database of glass properties that determine HLW glass processability and acceptability and relating these properties to glass composition. The report explains how the property-composition models are developed, fitted to data, used for glass formulation optimization, and continuously updated in response to changes in HLW composition estimates and changes in glass processing technology. Further, the report reviews the glass property-composition literature data and presents their preliminary critical evaluation and screening. Finally the report provides interim property-composition models for melt viscosity, for liquidus temperature (with spinel and zircon primary crystalline phases), and for the product consistency test normalized releases of B, Na, and Li. Models were fitted to a subset of the screened database deemed most relevant for the current HLW composition region

  15. SHORT COMMUNICATION: The kilogram redefinition—an interim solution

    Science.gov (United States)

    Flowers, J. L.; Petley, B. W.

    2005-10-01

    The role of measurements of the fundamental constants continues to be extremely valuable in underpinning the basic units of metrology. It is concluded that it might be preferable to sustain the present definition of the kilogram for an interim period by having a mise en pratique accompanying the definition, much as is currently done with the specified methods of realizing the metre. Central to this proposal is our view that there is considerable latitude in the interpretation of the present definition of the kilogram and that this can be exploited while always disseminating a consistent mass unit. This would also permit the present methods of maintaining and disseminating the kilogram to continue to be employed throughout the world where necessary at the present accuracy until the new technology could be phased in. An alternative definition of the kilogram, formulated in terms of frequency, is also introduced. This would give an ampere that fundamentally depends on the elementary charge, e, without the need to change the present definitions of the ampere and ohm.

  16. Extreme Heat Stress trends in ERA Interim 1979-2011

    Science.gov (United States)

    Buzan, J. R.; Huber, M.

    2012-12-01

    Heat stress is a function of temperature and humidity, and is therefore subject to the covariance of the two quantities. One of the robust predictions from climate change is an increase in temperatures across the planet, and therefore heat stress is projected to increase, however the covariance with humidity is less sure. It has been proposed that in future climate, significant portions of the land surface become subject to life threatening heat stress levels to humans and mammals. There are numerous methods and metrics for calculating heat stress, however, the majority use atmospheric state variables (pressure, temperature, and specific humidity), to measure the thermodynamic state of the atmosphere or estimate thermal load on humans and mammals. Here we present calculations of the evolution of heat stress for the past 3 decades using the European Centre for Medium-Range Weather Forecasts (ECMWF) ERA Interim reanalysis data product from near surface boundary layer state variables. We characterize both spatial and temporal trends with a variety of the most commonly used heat stress metrics (wet bulb temperatures, heat index, etc.). The metrics are calculated from 4x daily values to capture both the diurnal cycle and the daily peak values for these indices.

  17. SWSA 6 interim corrective measures environmental monitoring: FY 1990 results

    International Nuclear Information System (INIS)

    This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levels in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs

  18. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  19. Interim performance criteria for photovoltaic energy systems. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  20. Conceptual design of interim storage facility for CNAI

    International Nuclear Information System (INIS)

    The reduced storage capacity available in the two spent fuel pools of argentine PHWR Atucha-1 power plant, the current plans for extending the reactor operation beyond its design lifetime, and the government decision on Atucha-2 NPP construction ending, have motivated the evaluation of a dry storage option for the interim management of spent fuel assemblies. Two different designs are presently being analyzed by an expert working group, from both technical and economical points of views. Authors are proposing a modular system consisting of an arrangement of reinforced concrete structures into which welded metallic canisters loaded with 37 spent fuel assemblies each stored in horizontal position. The reinforced concrete module is designed to provide the necessary physical protection and biological shielding to the loaded canisters during long-term storage, as well as passive means to remove the spent fuel decay heat by a combination of radiation, conduction and natural air convection. In this works are presented advances in the conceptual designs for a spent nuclear fuel system to Atucha I nuclear power plant. (author)

  1. International Symposium on Site Characterization for CO2Geological Storage

    Energy Technology Data Exchange (ETDEWEB)

    Tsang, Chin-Fu

    2006-02-23

    Several technological options have been proposed to stabilize atmospheric concentrations of CO{sub 2}. One proposed remedy is to separate and capture CO{sub 2} from fossil-fuel power plants and other stationary industrial sources and to inject the CO{sub 2} into deep subsurface formations for long-term storage and sequestration. Characterization of geologic formations for sequestration of large quantities of CO{sub 2} needs to be carefully considered to ensure that sites are suitable for long-term storage and that there will be no adverse impacts to human health or the environment. The Intergovernmental Panel on Climate Change (IPCC) Special Report on Carbon Dioxide Capture and Storage (Final Draft, October 2005) states that ''Site characterization, selection and performance prediction are crucial for successful geological storage. Before selecting a site, the geological setting must be characterized to determine if the overlying cap rock will provide an effective seal, if there is a sufficiently voluminous and permeable storage formation, and whether any abandoned or active wells will compromise the integrity of the seal. Moreover, the availability of good site characterization data is critical for the reliability of models''. This International Symposium on Site Characterization for CO{sub 2} Geological Storage (CO2SC) addresses the particular issue of site characterization and site selection related to the geologic storage of carbon dioxide. Presentations and discussions cover the various aspects associated with characterization and selection of potential CO{sub 2} storage sites, with emphasis on advances in process understanding, development of measurement methods, identification of key site features and parameters, site characterization strategies, and case studies.

  2. Seal capability of interim post and core crown with temporary cements

    Directory of Open Access Journals (Sweden)

    Guilherme Bönecker-Valverde

    2010-06-01

    Full Text Available The purpose of the present study was to evaluate the in vitro seal capability of interim post and core crown restorations. Eighty teeth were selected and divided into 8 groups. Four experimental groups received interim posts and core crowns. Half of each group was decoronated at the cementum-enamel junction, groups PCCH and PCZO. The other half was sectioned 2 mm coronal to the cementum-enamel junction, groups PCrZO and PCrCH. The interim post and core crowns were luted with Rely X Temp NE, groups PCrZO and PCZO; Hydro C was used for Groups PCrCH and PCCH. The control groups, PC and PCr, received uncoated post and core crowns; groups OTg and OT were left without interim post and core crowns and were totally open. Infiltration was accessed by dye exposure followed by demineralization of the teeth. The length of the infiltration was measured using digital images taken from the specimens. The images were inserted into the Image Tool 3.0 software. Kruskal-Wallis analysis of variance and Dunn's multiple comparison method were used to test for significant differences among test groups (P < .05. Groups PCrZO and PCrCH showed the least dye penetration, followed by groups PCZO and PCCH. Teeth restored with interim post and core crowns will be subject to leakage. Ethics Committee: 095/2008.

  3. The Study on Regulations of Interim Spent Fuel Storage Facility in Japan

    International Nuclear Information System (INIS)

    The expansion of nuclear power generation inevitably result in the increase of spent nuclear fuel generation. Every year ∼700t of spent nuclear fuels are accumulated and total of 10,761t of spent nuclear fuels generated from 20 reactors are stored within the reactor sites by the end of 2009. If this trend is maintained, it is expected that Korea will have ∼30,000t of spent nuclear fuel by 2030. The capacity of pools in reactor sites is expected to be reached from 2016 and Korea need to prepare measures including the introduction of interim storage facility urgently. Considering the domestic situation described so far, it is be very necessary to survey and analyze the regulations of interim storage facilities of advanced countries. This report excerpts and analyzes the report of Japanese Nuclear Energy Safety Organization (JNES) on the regulations of interim storage facilities which was issues before the construction of the Mutz Interim Storage Facility. This report will be effectively used for the preparation of interim storage facility of Korea

  4. Global Scale Methane Emissions from On-Site Wastewater Management

    Science.gov (United States)

    Reid, M. C.; Guan, K.; Mauzerall, D. L.

    2013-12-01

    Pit latrines and other on-site sanitation methods are important forms of wastewater management at the global scale, providing hygienic and low-cost sanitation for more than 1.7 billion people in developing and middle-income regions. Latrines have also been identified as major sources of the greenhouse gas methane (CH4) from the anaerobic decomposition of organic waste in pits. Understanding the greenhouse gas footprint of different wastewater systems is essential for sustainable water resource development and management. Despite this importance, CH4 emissions from decentralized wastewater treatment have received little attention in the scientific literature, and the rough calculations underlying government inventories and integrated assessment models do not accurately capture variations in emissions within and between countries. In this study, we improve upon earlier efforts and develop the first spatially explicit approach to quantifying latrine CH4 emissions, combining a high-resolution geospatial analysis of population, urbanization, and water table (as an indicator of anaerobic decomposition pathways) with CH4 emissions factors from the 2006 IPCC Guidelines for National Greenhouse Gas Inventories. Country-level health and sanitation surveys were used to determine latrine utilization in 2000 and predict usage in 2015. 18 representative countries in Asia, Africa, and Latin America were selected for this analysis to illustrate regional variations in CH4 emissions and to include the greatest emitting nations. Our analysis confirms that pit latrines are a globally significant anthropogenic CH4 source, emitting 4.7 Tg CH4 yr-1 in the countries considered here. This total is projected to decrease ~25% by 2015, however, driven largely by rapid urbanization in China and decreased reliance on latrines in favor of flush toilets. India has the greatest potential for large growth in emissions in the post-2015 period, since public health campaigns to end open defecation

  5. REPORT OF ON-SITE INSPECTION WORKSHOP-16

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, J J

    2009-07-07

    The central issue addressed by this workshop was the task of making the on-site inspection (OSI) part of the Comprehensive Nuclear-Test-Ban Treaty verification system operationally ready at entry into force of the Treaty. It is recognized, and this was emphasized by the 2008 OSI Integrated Field Exercise (IFE), that it is not possible to develop every part of the OSI regime simultaneously. Therefore, it is necessary to prioritize the approach to OSI readiness. The reviews of the IFE have pointed to many elements of OSI readiness that still need development. The objective of this workshop was to provide priorities for the path forward for Working Group B to consider. Several critical areas have been identified that are related to the development of OSI readiness: (1) Technology development: Priorities are radionuclide and noble gas sampling and analysis, visual observation, multispectral/infrared imaging methods, active seismic methods and the recognition of the importance of signatures. (2) Organizational development: Priorities are health and safety, the Operations Support Centre, the Equipment Storage and Maintenance Facility, information technology data flow and communications. (3) Resources: The expertise to develop key parts of the OSI regime is not available within the current OSI Division staff. To develop these aspects of the regime will require more staff or supplements to the staff with cost-free experts or other means. Aspects of the system that could benefit from more staff include radionuclide and noble gas detection methods, data flow and communications, visual observation, multispectral/infrared methods and health and safety. As the path forward, participants of this workshop recognized a need to optimize the development of OSI priorities. The outcome of this workshop is to suggest for consideration an operational approach to OSI readiness that utilizes results of an evaluation of the relative effectiveness of OSI elements versus their relative

  6. Wide-Field Infrared Survey Telescope (WFIRST) Interim Report

    Science.gov (United States)

    Green, J.; Schechter, P.; Baltay, C.; Bean, R.; Bennett, D.; Brown, R.; Conselice, C.; Donahue, M.; Gaudi, S.; Lauer, T.; Perlmutter, S.; Rauscher, B.; Rhodes, J.; Roellig, T.; Stern, D.; Sumi, T.; Gerhels, N.; Sambruna, R.; Barry, R. K.; Content, D.; Grady, K; Jackson, C.; Kruk, J.; Melton, M.; Rioux, N.

    2011-01-01

    Satellite (IRAS), the Cosmic Background Explorer (COBE), Herschel, Spitzer, and Wide-field Infrared Sur-vey Explorer (WISE) are all space missions that have produced stunning new scientific advances by going to space to observe in the infrared. This interim report describes progress as of June 2011 on developing a requirements flowdown and an evaluation of scientific performance. An Interim Design Reference Mission (IDRM) configuration is presented that is based on the specifications of NWNH with some refinements to optimize the design in accordance with the new scientific requirements. Analysis of this WFIRST IDRM concept is in progress to ensure the capability of the observatory is compatible with the science requirements. The SDT and Project will continue to refine the mission concept over the coming year as design, analysis and simulation work are completed, resulting in the SDT s WFIRST Design Reference Mission (DRM) by the end of 2012.

  7. 4D Dynamic RNP Annual Interim Report-Year 1

    Science.gov (United States)

    Finkelsztein, Daniel M.; Sturdy, James L.; Alaverdi, Omeed; Chung, William W.; Salvano, Daniel; Klooster, Joel; Hochwarth, Joachim K.

    2010-01-01

    This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an

  8. Radiological characterisation of waste in interim storage building of COVRA

    International Nuclear Information System (INIS)

    At COVRA spatial dose rate distribution measurements were performed in December 2004 and December 2006 in the interim L/ILW storage building (LOG). This storage facility consists out of four large storage halls (height x width x depth 7 m x 40 m x 70 m) each with a volume of about 20000 m3. The scope of this study is to investigate the benefits of the waste storage strategy and procedures for minimization of the dose to the workers and the public. The main aim of the measurements in 2004 was: to validate the applied L/ILW storage strategy - to examine, if spatial collected data can be used to detect unforeseen differences in radiation level. The results of these measurements of spatial dose showed a number of unforeseen hotspots at different locations, so that it could be concluded that the applied storage strategy and procedures has to be improved. Further the dose rate at the height of 6 m, mainly responsible for the sky-shine dose rate, being an important part of the dose rate to the public at the site boundary, has to be reduced by more shielding. In December 2006 a second serial of spatial radiological and non-radiological data have been collected. The applied nondestructive INDSS-R (Indoor Survey System-Radiation ) method has been improved, so that the following 3-dimensional data could be collected between 0.5 m and 5.5 m: - dose rate (by pressurized ionisation chamber). nuclide depended gamma photon flux (3 x 3 NaI). - temperature and relative humidity. These last two non-radiological parameters were measured to verify the storage conditions of the waste. The main aim of these 3 dimensional collection was to verify the second stated aim of 2004. (authors)

  9. Basis for Interim Operation for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the current and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment

  10. Interim results from UO2 fuel oxidation tests in air

    International Nuclear Information System (INIS)

    An experimental program is being conducted at Pacific Northwest Laboratory (PNL) to extend the characterization of spent fuel oxidation in air. To characterize oxidation behavior of irradiated UO2, fuel oxidation tests were performed on declad light-water reactor spent fuel and nonirradited UO2 pellets in the temperature range of 135 to 2500C. These tests were designed to determine the important independent variables that might affect spent fuel oxidation behavior. The data from this program, when combined with the test results from other programs, will be used to develop recommended spent fuel dry-storage temperature limits in air. This report describes interim test results. The initial PNL investigations of nonirradiated and spent fuels identified the important testing variables as temperature, fuel burnup, radiolysis of the air, fuel microstructure, and moisture in the air. Based on these initial results, a more extensive statistically designed test matrix was developed to study the effects of temperature, burnup, and moisture on the oxidation behavior of spent fuel. Oxidation tests were initiated using both boiling-water reactor and pressurized-water reactor fuels from several different reactors with burnups from 8 to 34 GWd/MTU. A 105 R/h gamma field was applied to the test ovens to simulate dry storage cask conditions. Nonirradiated fuel was included as a control. This report describes experimental results from the initial tests on both the spent and nonirradiated fuels and results to date on the tests in a 105 R/h gamma field. 33 refs., 51 figs., 6 tabs

  11. Idaho Waste Vitrification Facilities Project Vitrified Waste Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Bonnema, Bruce Edward

    2001-09-01

    This feasibility study report presents a draft design of the Vitrified Waste Interim Storage Facility (VWISF), which is one of three subprojects of the Idaho Waste Vitrification Facilities (IWVF) project. The primary goal of the IWVF project is to design and construct a treatment process system that will vitrify the sodium-bearing waste (SBW) to a final waste form. The project will consist of three subprojects that include the Waste Collection Tanks Facility, the Waste Vitrification Facility (WVF), and the VWISF. The Waste Collection Tanks Facility will provide for waste collection, feed mixing, and surge storage for SBW and newly generated liquid waste from ongoing operations at the Idaho Nuclear Technology and Engineering Center. The WVF will contain the vitrification process that will mix the waste with glass-forming chemicals or frit and turn the waste into glass. The VWISF will provide a shielded storage facility for the glass until the waste can be disposed at either the Waste Isolation Pilot Plant as mixed transuranic waste or at the future national geological repository as high-level waste glass, pending the outcome of a Waste Incidental to Reprocessing determination, which is currently in progress. A secondary goal is to provide a facility that can be easily modified later to accommodate storage of the vitrified high-level waste calcine. The objective of this study was to determine the feasibility of the VWISF, which would be constructed in compliance with applicable federal, state, and local laws. This project supports the Department of Energy’s Environmental Management missions of safely storing and treating radioactive wastes as well as meeting Federal Facility Compliance commitments made to the State of Idaho.

  12. E-Area Performance Assessment Interim Measures Assessment FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  13. Interim report of the task force on energy policy

    International Nuclear Information System (INIS)

    A Task Force was established by the Premier of British Columbia in August 2001 to draft an energy policy framework for the province. Based on best practices worldwide, and keeping in mind the specific energy needs of British Columbia, this framework aims at fostering energy development in British Columbia, in accordance with exemplary environmental practices. This interim report comprises the preliminary findings of the Task Force, and public input is sought before the final report is finalized and presented to government. The energy sector of British Columbia comprises hydroelectric power, oil, gas and coal resources. In addition, green energy and alternative energy technologies are being developed, such as wind, solar, and wave power, and hydrogen fuel cells. Industry and individual consumers are well served by the highly developed transmission and distribution systems for energy. Several strategic directions were identified by the Task Force for inclusion in the energy policy of British Columbia, to meet its full potential. They are: growth to ensure safe, reliable energy and take advantage of economic opportunities; diversification; competitiveness; industry restructuring and expansion; environmental imperative; government leadership; and community and First Nations' involvement. Some changes are also required for the continuing success of the energy sector in British Columbia: a move to fully competitive markets in the electricity system, the development of natural gas storage capacity in the Lower Mainland, additional considerations for coal use, and the development of alternative energy sources. It is expected that private capital and more energy supply will result from a fully competitive energy market, which in turn would lower energy costs. Jobs and income would increase as a result of the growth in the sector. Diversification makes good economic and environmental sense. tabs., figs

  14. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Science.gov (United States)

    2012-09-07

    ... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate...

  15. 77 FR 71019 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-04; Guidance on...

    Science.gov (United States)

    2012-11-28

    ... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-04; Guidance on...: Nuclear Regulatory Commission. ACTION: Japan Lessons-Learned Project Directorate Interim Staff Guidance issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing the Final Japan...

  16. 78 FR 48201 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2013-01; Guidance for...

    Science.gov (United States)

    2013-08-07

    ... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2013-01; Guidance for... Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2013-01, ``Guidance for... to http://www.nrc.gov/reading-rm/doc-collections/isg/japan-lessons-learned.html and refer to...

  17. 75 FR 41726 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Coverage of...

    Science.gov (United States)

    2010-07-19

    ... Internet search engines. No deletions, modifications, or redactions will be made to the comments received... April 14, 2010 (75 FR 19297). The second phase was interim final regulations implementing PHS Act... May 13, 2010 (75 FR 27122). The third phase was interim final regulations implementing section 1251...

  18. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... can be retrieved by most Internet search engines. No deletions, modifications, or redactions will be... Register on April 14, 2010 (75 FR 19297). The second phase was interim final regulations implementing PHS... Register on May 13, 2010 (75 FR 27122). The third phase was interim final regulations implementing...

  19. 33 CFR 96.350 - Interim Document of Compliance certificate: what is it and when can it be used?

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim Document of Compliance certificate: what is it and when can it be used? 96.350 Section 96.350 Navigation and Navigable Waters COAST...? § 96.350 Interim Document of Compliance certificate: what is it and when can it be used? (a) An...

  20. 76 FR 63676 - Final Division of Safety Systems Interim Staff Guidance DSS-ISG-2010-01: Staff Guidance Regarding...

    Science.gov (United States)

    2011-10-13

    ... COMMISSION Final Division of Safety Systems Interim Staff Guidance DSS-ISG- 2010-01: Staff Guidance Regarding... final Division of Safety Systems Interim Staff Guidance, (DSS-ISG) DSS- ISG-2010-01, ``Staff Guidance... guidance to the NRC staff reviewer to address the increased complexity of recent spent fuel pool...

  1. 78 FR 53183 - Request for Public Comments Regarding the Interim Environmental Review of the Trans-Pacific...

    Science.gov (United States)

    2013-08-28

    ... interim environmental review of the proposed Trans-Pacific Partnership Agreement (TPP). The interim... with Executive Order 13141-Environmental Review of Trade Agreements (64 FR 63,169, Nov. 18, 1999) and its implementing guidelines (65 FR 79,442, Dec. 19, 2000) and report on such reviews to the...

  2. Immobilized High Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report 2nd Generation Implementing Architecture

    Energy Technology Data Exchange (ETDEWEB)

    CALMUS, R.B.

    2000-09-14

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document.

  3. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ... the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (40 CFR 300.430(e)(2)(i... AGENCY RIN 2050-ZA05 Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA...) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at...

  4. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  5. Process evaluation of the Bonneville Power Administration Interim Residential Weatherization Program

    Energy Technology Data Exchange (ETDEWEB)

    Lerman, D.I.; Bronfman, B.H.

    1984-08-01

    A process evaluation of the Bonneville Power Administration (BPA) Interim Residential Weatherization Program was conducted between December of 1983 and March of 1984. For this evaluation seven of the utility participants were visited, as were the four BPA area offices serving those utilities. Interviews were also conducted with key staff members at BPA headquarters in Portland. This report describes the Interim Program and the elements of the BPA organizational structure involved in management of the program. It deals also with the implementation process at the seven utilities involved in the evaluation; perceptions of the key actors as to the strengths and weaknesses of the program; the adequacy of the BPA reimbursement for utility administrative expenses; and finally lessons for the Long-Term Program, the BPA residential program which followed the Interim Program in October 1983.

  6. THE IMPORTANCE OF FINANCIAL INTERIM REPORTING FOR THE POSITION OF COMPANIES

    Directory of Open Access Journals (Sweden)

    Claudia‐Elena\tGRIGORAȘ‐ICHIM

    2015-12-01

    Full Text Available The importance that each company must grant to the strategic sources of information generates our concern for analysis of the interim financial reporting. In every enterprise, there are doubts on the usefulness of interim financial reports, given the following elements: the necessary time for their preparation (relatively long, their restricted character and the resources necessary to establish them. Finding a common solution to these problems and, implicitly, increasing the interest for interim financial reporting, can help to increase the economic performance of the company, either by reducing the unnecessary costs related to time, or by increasing communication and transparency with third parties. An appropriate management can act early in the direction of counteracting the negative effects in their company or prevention of any commercial or production failures, the overall economic trends in that field and increasing productivity. Starting from these premises, we propose a research in order to capture the main aspects related to the mentioned issues.

  7. 76 FR 14691 - Delphi Steering, Including On-Site Leased Workers From Acro Service Corporation, Aerotek, Inc...

    Science.gov (United States)

    2011-03-17

    ... Services, Manpower, Inc., Rapid Global Business Solutions, Inc., TAC Worldwide, Trialon Corp., Trison Business Solutions, Wright K. Technologies, Interim Health Care and Advantage Technical Resourcing, Saginaw...., Rapid Global Business Solutions, Inc., TAC Worldwide, Trialon Corp., Trison Business Solutions, Wright...

  8. 1987 Federal interim storage fee study: A technical and economic analysis

    International Nuclear Information System (INIS)

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs

  9. Dynamics of Flexible Rotor Systems with an Interim Mass Unbalanced Disk Using a Spectral Element Model

    OpenAIRE

    Sangkyu Choi; Usik Lee

    2014-01-01

    A frequency domain spectral element model is developed for a rotor system that consists of two spinning shafts and an interim disk or blade system. In this study, the shafts are represented by spinning Timoshenko beam models, and the interim disk system is represented by a uniform thick rigid disk with an unbalanced mass. In our derivation of the governing equations of motion of the disk system, the disk is considered to be wobbling about the geometric center of the disk at which the spinning...

  10. Distribution of mental health professionals working on site in English and Welsh general practices.

    OpenAIRE

    Kendrick, T.; Sibbald, B; Addington-Hall, J.; Brenneman, D; Freeling, P.

    1993-01-01

    OBJECTIVE--To describe the nature and distribution of mental health professionals working on site in general practices. DESIGN--Postal questionnaire and telephone interview survey. SETTING--English and Welsh general practices. SUBJECTS--1880 general practitioners, of whom 1542 (82%) responded. MAIN OUTCOME MEASURES--Prevalence, types, and distribution of mental health professionals working on site among general practices. Factors predicting the presence of mental health professionals on site....

  11. Retrieval of plutonium-contaminated waste materials from interim storage

    International Nuclear Information System (INIS)

    Plutonium-contaminated solid waste materials (PCM) (contact-handled transuranic waste) originating from the early UK defence program were placed for interim storage in existing structures at Drigg, a site some 6km (4 miles) from Sellafield (formerly known as Windscale), the UK reprocessing and plutonium production site. The waste was contained within steel drums of up to 205 liters (55 US gallons) capacity or was contained in larger timber and plastic cuboid containment, known as 'crates'. The paper will describe the typical constituents of the drummed waste and of the crated waste, a proportion of which consists of redundant glove box facilities from the early production lines themselves. British Nuclear Fuels pie (BNFL) became responsible for the Drigg site and waste stored on it at Company formation in 1971. In the mid-1970s, a commitment was given that PCM would be removed from the Drigg site leaving it to fulfil its role as the principal site in the UK for the disposal of solid low level radioactive waste from Sellafield and from elsewhere. Following a program of design and procurement of necessary facilities, retrieval of drummed PCM began in 1976. A team of operators, not full-time on this task, removed all drummed PCM from the existing storage structures, known as magazines, by 1986. This work is briefly reviewed in the paper. Five of the magazines contain about 200 non-drummed packages which remain to be removed. Facilities to permit the retrieval of that waste have been designed and are now being procured and installed so that first retrieval can begin during this year. The project team has addressed all aspects of safety and has needed to obtain necessary consents and authorizations from Her Majesty's Inspectorate of Pollution, so far as the safety of the environment and of members of the public is concerned, from Her Majesty's Nuclear Installations Inspectorate, so far as the safety of the workforce is concerned, and from the Department of Transport, so

  12. Plutonium Immobilization Form Development Interim and Final Data Report Summaries

    Energy Technology Data Exchange (ETDEWEB)

    VanKonynenburg, R.; Ebbinghaus, B.

    2000-06-01

    Contained within this report are summaries of the available interim and final data summary reports provided by ANSTO, ANL, LLNL, and WSRC in support of work in the Form Development activity in the Plutonium Immobilization Development and Testing Program. Milestone reports and technical papers prepared for journals or conference proceedings are not included in this list. This document covers work from about 1997 to the present. All of the following reports are available from the Plutonium Immobilization Program Document Control Center (DCC) at LLNL. In most cases, the documents can also be obtained from the libraries the originating site or from the document's authors. All samples of the various formulations discussed in the following summaries were prepared by one of four processes: Wet-milling, dry-milling, an alkoxide-nitrate process, or attritor milling. The fabrication processes differ primarily in the mixing steps. The wet milling process is the one most commonly used. It is a simple ball milling process where water is added that provides intimate mixing of the materials. The dry milling process is a worst case dry mixing process. The alkoxide-nitrate process provides for very intimate mixing and is used when equilibrium samples are desired. The attritor milling process simulates the process being developed for the Plutonium Immobilization Plant. After mixing, the subsequent calcination and consolidation steps are generally the same. Most samples were consolidated by cold pressing and sintering although some of the earlier samples or Some of the single-phase samples were prepared by hot pressing. The sample identification numbers (ID's) that are referenced in the summaries (e.g. A-0, B3-13, etc.) are described in the Sample Test Matrix (PIP-99-012 and PIP-00-016). Samples which contain both plutonium and uranium are given the designation Hf-Pu-U samples. When Ce was used as a surrogate for Pu, the designation is Hf-Ce-U. When Th was used as a

  13. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  14. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  15. On-site or off-site treatment of medical waste: a challenge

    OpenAIRE

    Taghipour, Hassan; Mohammadyarei, Taher; Asghari Jafarabadi, Mohamad; Asl Hashemi, Ahmad

    2014-01-01

    Treating hazardous-infectious medical waste can be carried out on-site or off-site of health-care establishments. Nevertheless, the selection between on-site and off-site locations for treating medical waste sometimes is a controversial subject. Currently in Iran, due to policies of Health Ministry, the hospitals have selected on-site-treating method as the preferred treatment. The objectives of this study were to assess the current condition of on-site medical waste treatment facilities, com...

  16. 78 FR 76160 - Public Housing Assessment System (PHAS) Capital Fund Interim Scoring Notice: Reinstitution of...

    Science.gov (United States)

    2013-12-16

    ... by an interim rule published on February 23, 2011, at 76 FR 10136. The Capital Fund Program Indicator... Scoring Notice, also published on February 23, 2011, at 76 FR 10053. Under this indicator, PHAs can... occupancy ] rate is accounted for under another indicator, the management operations indicator, at 24...

  17. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Science.gov (United States)

    2011-09-16

    ... residues in whole milk and of which no more than 0.05 ppm is tetrachlorvinphos per se) at 0.05 ppm; poultry..., except kidney and liver.. 1.0 March 18, 2013. Milk, fat (reflecting negligible residues in 0.05 March 18... AGENCY 40 CFR Part 180 Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances...

  18. 40 CFR 57.302 - Performance level of interim constant controls.

    Science.gov (United States)

    2010-07-01

    ... exceed the following: (i) For sulfuric acid plants on copper smelters, 12-hour running average; (ii) For... smelters, 2-hour running average; (iv) For dimethylaniline (DMA) scrubbing units on copper smelters, 2-hour... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Performance level of interim...

  19. 76 FR 40777 - Interim Enforcement Policy for Certain Fire Protection Issues

    Science.gov (United States)

    2011-07-12

    ... Register notice Date Brief description 69 FR 33684 June 16, 2004 Describes the initial interim Enforcement Policy on fire protection. 70 FR 2662 January 14, 2005 Revises the submittal date for licensees to receive enforcement discretion for existing identified fire protection program noncompliant issues. 71...

  20. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    Science.gov (United States)

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  1. 78 FR 63276 - Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

    Science.gov (United States)

    2013-10-23

    ... Federal Aviation Administration Interim Policy, FAA Review of Solar Energy System Projects on Federally... federally obligated airports to construct solar energy systems on airport property. FAA is adopting an... for measuring ocular impact of proposed solar energy systems which are effective upon publication....

  2. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Science.gov (United States)

    2010-10-01

    ... of 46 CFR part 2, subpart 2.01 of this chapter. ... 46 Shipping 1 2010-10-01 2010-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype...

  3. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  4. Engineering report single-shell tank farms interim measures to limit infiltration through the vadose zone

    Energy Technology Data Exchange (ETDEWEB)

    HAASS, C.C.

    1999-10-14

    Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included.

  5. Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 2: Site Visit Reports.

    Science.gov (United States)

    CSR, Inc., Washington, DC.

    This second volume of the interim report provides detailed case study reports on each of the eight Youth Apprenticeship Projects. (Volume 1, an overview of data from the site visits, is available separately as CE 032 791.) Discussion areas covered in each site visit report are local context/operational environment, administrative information,…

  6. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    TORRES, T.D.

    2000-08-16

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms.

  7. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    RUNG, M.P.

    2000-06-20

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms.

  8. 40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.

    Science.gov (United States)

    2010-07-01

    ... gasoline non-conformity violations caused solely by the addition of misadditized ethanol or other PRC to... Detergent Gasoline § 80.156 Liability for violations of the interim detergent program controls and prohibitions. (a) Persons liable—(1) Gasoline non-conformity. Where gasoline contained in any storage tank...

  9. 78 FR 37719 - Interim Final Determination To Defer Sanctions; California; South Coast Air Quality Management...

    Science.gov (United States)

    2013-06-24

    ... approval of revisions to the South Coast Air Quality Management District's (SCAQMD) portion of the... Quality Management District Proposed Contingency Measures for the 2007 PM 2.5 SIP'' (dated October 2011... AGENCY 40 CFR Part 52 Interim Final Determination To Defer Sanctions; California; South Coast Air...

  10. 76 FR 9381 - Notice of Availability of Interim Staff Guidance Documents for Spent Fuel Storage Casks

    Science.gov (United States)

    2011-02-17

    ... COMMISSION Notice of Availability of Interim Staff Guidance Documents for Spent Fuel Storage Casks AGENCY... Gordon, Structural Mechanics and Materials Branch, Division of Spent Fuel Storage and Transportation... performing technical reviews of spent fuel storage and transportation packaging licensing actions.'' This...

  11. Educative Accountability Policies for Tasmania's Locally Managed Schools: Interim Policy Research Findings.

    Science.gov (United States)

    Macpherson, R. J. S.

    1996-01-01

    Summarizes interim findings of a policy research project in Tasmania, Australia, aimed at producing educative accountability options for identifying processes and criteria to improve learning, teaching, and leadership. Identifies preferred accountability criteria and processes in Tasmania's locally managed school district, maps patterns of…

  12. Engineering report single-shell tank farms interim measures to limit infiltration through the vadose zone

    International Nuclear Information System (INIS)

    Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included

  13. 77 FR 65366 - Interim Procedures for Considering Requests From the Public for Textile and Apparel Safeguard...

    Science.gov (United States)

    2012-10-26

    .... 8818, 77 FR 29519 (May 18, 2012). Background Title III, Subtitle B, Section 321 through Section 328 of... IMPLEMENTATION OF TEXTILE AGREEMENTS [Docket :121018560-2560-01; OMB Control :0625-0271 (Expiration: 10/31/2015)] RIN 0625-XC003 Interim Procedures for Considering Requests From the Public for Textile and...

  14. 77 FR 15997 - Interim Procedures for Considering Requests From the Public for Textile and Apparel Safeguard...

    Science.gov (United States)

    2012-03-19

    ... force. In Presidential Proclamation 8783 (77 FR 14265, March 9, 2012), the President delegated to the... Apparel Safeguard Actions on Imports from Peru'', 76 FR 9556 (February 18, 2011). A request will only be... IMPLEMENTATION OF TEXTILE AGREEMENTS Interim Procedures for Considering Requests From the Public for Textile...

  15. 78 FR 31886 - Interim Procedures for Considering Requests From the Public for Textile and Apparel Safeguard...

    Science.gov (United States)

    2013-05-28

    ... 321 through Section 328 of the Implementation Act and Proclamation No. 8894, 77 FR 66507 (November 5... IMPLEMENTATION OF TEXTILE AGREEMENTS [Docket : 130430427-3427-01; OMB Control : 0625-0274 (Expiration: 04/30/2016)] RIN 0625-XC006 Interim Procedures for Considering Requests From the Public for Textile and...

  16. 76 FR 52996 - Public Company Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim...

    Science.gov (United States)

    2011-08-24

    .... 34-64814 (Jul. 6, 2011) [76 FR 40961 (Jul. 12, 2011)]. II. Discussion Section 982 of the Dodd-Frank... COMMISSION Public Company Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim..., 2011, the Public Company Accounting Oversight Board (the ``Board'' or the ``PCAOB'') filed with...

  17. THE INTERIM EXPERTS’ COUNCIL RESOLUTION ON THE EMPA-REG OUTCOME TRIAL ISSUES

    Directory of Open Access Journals (Sweden)

    M. V. Shestakova

    2016-05-01

    Full Text Available The interdisciplinary interim experts’ council on March 3, 2016 in Moscow have considered the EMPA-REG OUTCOME trial results and suggested a number of propositions and recommendations on further empagliflozin’s cardiovascular effects investigation and its clinical application in patients with type 2 diabetes at high cardiovascular risk.

  18. THE INTERIM EXPERTS’ COUNCIL RESOLUTION ON THE EMPA-REG OUTCOME TRIAL ISSUES

    OpenAIRE

    M V Shestakova; S. A. Boytsov; O. M. Drapkina; T Yu Demidova; Drexel, H.; M B Antsiferov; N A Petunina; I. A. Chernikova; V. Yu. Kalashnikov; T P Bardymova; V. K. Protasov; A. Yu. Babenko; L. A. Ruyatkina; V V Klimontov; V. V. Salukhov

    2016-01-01

    The interdisciplinary interim experts’ council on March 3, 2016 in Moscow have considered the EMPA-REG OUTCOME trial results and suggested a number of propositions and recommendations on further empagliflozin’s cardiovascular effects investigation and its clinical application in patients with type 2 diabetes at high cardiovascular risk.

  19. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2A. GSFLS visit findings (appendix). Interim report

    International Nuclear Information System (INIS)

    This appendix is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This appendix provides the legal/regulatory reference material, supportive of Volume 2 - GSFLS Visit Finding and Evaluations; and certain background material on British Nuclear Fuel Limited

  20. A Reading Program for Mexican-American Children. Second Interim Report.

    Science.gov (United States)

    Amsden, Constance

    A second interim report on a reading program for Mexican-American children in an East Los Angeles elementary school notes that reading ability in the primary grades has improved. In January, 1967, the average first grade reading score on the Stanford Reading Test was at the third percentile, whereas in January, 1968, the score was at the eighth…

  1. A Reading Program for Mexican-American Children, Third Interim Report. Final Report.

    Science.gov (United States)

    Amsden, Constance

    The third and final interim report is devoted to analysis of research data relating to a 3-year experimental reading program for Mexican American children at the Malabar Street School in Los Angeles. The program utilized language development methods, individualized instruction, and parental assistance to improve the children's competencies. Using…

  2. Safety evaluation for the interim stabilization of Tank 241-C-103

    Energy Technology Data Exchange (ETDEWEB)

    Geschke, G.R.

    1995-03-01

    This document provides the basis for interim stabilization of tank 241-C-103. The document covers the removal of the organic liquid layer and the aqueous supernatant from tank 241-C-103. Hazards are identified, consequences are calculated and controls to mitigate or prevent potential accidents are developed.

  3. 78 FR 56752 - Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors...

    Science.gov (United States)

    2013-09-13

    ... COMMISSION Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors... and operate integral pressurized water reactors (iPWR). This guidance applies to environmental reviews... Environmental Guidance for iPWR Reviews.'' The purpose of this ISG is to clarify the NRC guidance...

  4. 77 FR 74512 - Interim Policy Leasing for Renewable Energy Data Collection Facility on the Outer Continental...

    Science.gov (United States)

    2012-12-14

    ... testing facilities on the OCS (72 FR 62673). An applicant has submitted a lease proposal to BOEM pursuant... the Federal Register (72 FR 62673), BOEM announced that it had established an interim policy under... renewable energy activities and initiatives (73 FR 21152). BOEM also took into consideration the...

  5. 14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Interim qualification of FSTDs for new aircraft types or models. 60.21 Section 60.21 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the...

  6. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2A. GSFLS visit findings (appendix). Interim report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-31

    This appendix is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This appendix provides the legal/regulatory reference material, supportive of Volume 2 - GSFLS Visit Finding and Evaluations; and certain background material on British Nuclear Fuel Limited (BNFL).

  7. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  8. T-TY Tank Farm Interim Surface Barrier Demonstration - Vadose Zone Monitoring FY10 Report

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Field, Jim G. [Washington River Protection Solutions, Inc., Richland, WA (United States); Parker, Danny L. [Washington River Protection Solutions, Inc., Richland, WA (United States)

    2011-01-01

    The U.S. Department of Energy’s Office of River Protection has constructed interim surface barriers over a portion of the T and TY tank farms as part of the Interim Surface Barrier Demonstration Project. The interim surface barriers (hereafter referred to as the surface barriers or barriers) are designed to minimize the infiltration of precipitation into the soil zones containing radioactive contaminants and minimize the movement of the contaminants. As part of the demonstration effort, vadose zone moisture is being monitored to assess the effectiveness of the barriers at reducing soil moisture. Solar-powered systems were installed to continuously monitor soil water conditions at four locations in the T (i.e., instrument Nests TA, TB, TC, and TD) and the TY (i.e., instrument Nests TYA and TYB) Farms beneath the barriers and outside the barrier footprint as well as site meteorological conditions. Nests TA and TYA are placed in the area outside the barrier footprint and serve as controls, providing subsurface conditions outside the influence of the surface barriers. Nest TB provides subsurface measurements to assess surface-barrier edge effects. Nests TC, TD, and TYB are used to assess changes in soil-moisture conditions beneath the interim surface barriers.

  9. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ... scope of CMAQ eligibility for electric vehicle charging stations and natural gas vehicle refueling... focus on construction equipment and vehicles, and summarizes the interim approach to calculating the PM... types of rail service in a January 16, 2002, Federal Register notice (67 FR 2278), and in a March...

  10. 77 FR 4758 - Foreign-Trade Zone 59-Lincoln, Nebraska, Application for Temporary/Interim Manufacturing...

    Science.gov (United States)

    2012-01-31

    ... Manufacturing Authority, Novartis Consumer Health, Inc. (Pharmaceutical Product Manufacturing), Lincoln, NE An... Lincoln Foreign-Trade Zone, Inc., grantee of FTZ 59, requesting temporary/interim manufacturing (T/ IM... request to the FTZ Board for FTZ manufacturing authority beyond a two-year period, which may...

  11. Experience collecting interim data on mortality: an example from the RALES study

    Directory of Open Access Journals (Sweden)

    Kulbertus Henri

    2001-02-01

    Full Text Available Abstract Introduction The Randomized Aldactone Evaluation Study (RALES randomized 822 patients to receive 25 mg spironolactone daily and 841 to receive placebo. The primary endpoint was death from all causes. Randomization began on March 24, 1995; recruitment was completed on December 31, 1996; follow-up was scheduled to continue through December 31, 1999. Evidence of a sizeable benefit on mortality emerged early in the RALES. The RALES data safety monitoring board (DSMB, which met semiannually throughout the trial, used a prespecified statistical guideline to recommend stopping for efficacy. At the DSMB's request, its meetings were preceded by an 'endpoint sweep', that is, a census of all participants to confirm their vital status. Methods We used computer simulation to evaluate the effect of the sweeps. Results The sweeps led to an estimated 5 to 8% increase in the number of reported deaths at the fourth and fifth interim analyses. The data crossed the statistical boundary at the fifth interim analysis. If investigators had reported all deaths within the protocol-required 24-h window, the DSMB might have recommended stopping after the fourth interim analysis. Discussion Although endpoint sweeps can cause practical problems at the clinical centers, sweeps are very useful if the intervals between patient visits or contact are long or if endpoints require adjudication by committee, reading center, or central laboratory. Conclusion We recommend that trials with interim analyses institute active reporting of the primary endpoints and endpoint sweeps.

  12. 78 FR 72897 - Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing...

    Science.gov (United States)

    2013-12-04

    ... Human Drug Compounding Outsourcing Facilities Under Section 503B of the Federal Food, Drug, and Cosmetic... entitled ``Interim Product Reporting for Human Drug Compounding Outsourcing Facilities Under Section 503B... register as outsourcing facilities (outsourcing facilities). DATES: Although you can comment on...

  13. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Science.gov (United States)

    2010-07-01

    ... HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Incinerators § 265.352 Interim status incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to this... particular hazardous wastes. 265.352 Section 265.352 Protection of Environment ENVIRONMENTAL...

  14. Neutron spectrometry at the interim storage facility for spent nuclear fuel

    CERN Document Server

    Králik, M; Studeny, J

    2002-01-01

    Dosimetric characteristics of neutron and photon components of mixed fields around casks for spent nuclear fuel have been determined at various places at the dry interim storage facility. The results obtained with metrological grade instruments were compared with data provided by usual survey meters for both neutrons and photons.

  15. Wendell Flinchum to serve as interim chief of Virginia Tech Police

    OpenAIRE

    Owczarski, Mark

    2006-01-01

    Lt. Wendell Flinchum, a 21-year veteran of the Virginia Tech Police Department, has been named the department's interim chief of police effective July 1. Flinchum's appointment follows the resignation of Chief Debra Duncan, who will leave the university to become police chief for the City of Monroe, N.C.

  16. 75 FR 11922 - Apria Healthcare, Including On-Site Leased Workers From Corestaff, Ultimate Staffing (Roth...

    Science.gov (United States)

    2010-03-12

    ... Employment and Training Administration Apria Healthcare, Including On-Site Leased Workers From Corestaff... Healthcare, including on-site leased workers from Corestaff, Cromwell, Connecticut. The notice was published in the Federal Register on January 25, 2010 (75 FR 3938). At the request of the State agency,...

  17. 13 CFR 120.1051 - Frequency of on-site reviews and examinations.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Frequency of on-site reviews and examinations. 120.1051 Section 120.1051 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Supervision § 120.1051 Frequency of on-site reviews and...

  18. 76 FR 4724 - Polaris Industries, Including On-Site Leased Workers From Westaff and Supply Technologies...

    Science.gov (United States)

    2011-01-26

    ..., 2010 (75 FR 56143). At the request of the petitioner, the Department reviewed the certification for... Employment and Training Administration Polaris Industries, Including On-Site Leased Workers From Westaff and... Assistance on August 26, 2010, applicable to workers of Polaris Industries, including on-site leased...

  19. 75 FR 77666 - Polaris Industries, Including On-Site Leased Workers From Westaff and Supply Technologies...

    Science.gov (United States)

    2010-12-13

    ..., 2010 (75 FR 56143). At the request of the petitioner, the Department reviewed the certification for... Employment and Training Administration Polaris Industries, Including On-Site Leased Workers From Westaff and... Assistance on August 26, 2010, applicable to workers of Polaris Industries, including on-site leased...

  20. 75 FR 55613 - General Motors Corporation, Renaissance Center, Including On-Site Leased Workers From Accretive...

    Science.gov (United States)

    2010-09-13

    ... on May 20, 2010 (75 FR 28299). At the request of the State agency, the Department reviewed the... Employment and Training Administration General Motors Corporation, Renaissance Center, Including On-Site... of General Motors Corporation, Renaissance Center, including on-site leased workers from...

  1. 78 FR 48468 - Delphi Corporation, Electronics and Safety Division, Including On-Site Leased Workers From...

    Science.gov (United States)

    2013-08-08

    ... determination was published in the Federal Register on June 10, 2013 (Volume 78 FR Pages 34672-34674). At the... Employment and Training Administration Delphi Corporation, Electronics and Safety Division, Including On-Site... to workers of Delphi Corporation, Electronics and Safety Division, including on-site leased...

  2. 75 FR 879 - National Semiconductor Corporation Arlington Manufacturing Site Including On-Site Leased Workers...

    Science.gov (United States)

    2010-01-06

    ... of integrated circuits. The company reports that on-site leased workers from ASML and Construction... workers leased from ASML and Construction Mechanical Systems working on-site at the Arlington, Texas... leased workers from CMPS have their (UI) wages reported to Silverleaf. The amended notice applicable...

  3. 7 CFR 3560.353 - Scheduling of on-site monitoring reviews.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Scheduling of on-site monitoring reviews. 3560.353 Section 3560.353 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING....353 Scheduling of on-site monitoring reviews. Generally, the Agency will provide the borrower...

  4. Annex D-200 Area Interim Storage Area Final Safety Analysis Report [FSAR] [Section 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    CARRELL, R D

    2002-07-16

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft{sup 2} and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped off-site to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the Fast Flux Test Facility (FFTF) SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF) TRIGA'--One Rad-Vault' container will store two DOT-6M3 containers and six NRF TRIGA casks currently stored in the 400 Area. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-I cask4 with an inner commercial light water reactor (LWR) canister, will be used for commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available.

  5. Interim summary report of the safety case 2009

    International Nuclear Information System (INIS)

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy), Posiva is preparing to submit a construction license application for the final disposal spent nuclear fuel at the Olkiluoto site, Finland, by the end of the year 2012. Disposal will take place in a geological repository implemented according to the KBS-3 method. The long-term safety section supporting the license application will be based on a safety case that, according to the internationally adopted definition, will be a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. The present Interim Summary Report represents a major contribution to the development of this safety case. The report has been compiled in accordance with Posiva's current plan for preparing this safety case. A full safety case for the KBS-3V variant will be developed to support the Preliminary Safety Assessment Report (PSAR) in 2012. The report outlines the current design and safety concept for the planned repository. It summarises the approach used to formulate scenarios for the evolution of the disposal system over time, describes these scenarios and presents the main models and computer codes used to analyse them. It also discusses compliance with Finnish regulatory requirements for long-term safety of a geological repository and gives the main evidence, arguments and analyses that lead to confidence, on the part of Posiva, in the long-term safety of the planned repository. Current understanding of the evolution of the disposal system indicates that, except a few unlikely circumstances affecting a small number of canisters, spent fuel will remain isolated, and the radionuclides contained within the canisters, for hundreds of thousands of years or more, in accordance with the base scenario. Confidence in this base scenario derives, in the first place, from the

  6. Age of stratospheric air in the ERA-Interim

    Science.gov (United States)

    Diallo, M.; Legras, B.; Chedin, A.

    2012-07-01

    The age of stratospheric air is calculated over 22 yr of the ERA-Interim reanalysis using an off-line Lagrangian transport model and heating rates. At low and mid-latitudes, the mean age of air is in good agreement with observed ages from aircraft flights, high altitude balloons and satellite observations of CO2 and SF6. The mid-latitude age spectrum in the lower stratosphere exhibits a long tail with a peak at 0.5 yr, which is maximum at the end of the winter, and a secondary flat maximum between 4 and 5 yr due to the combination of fast and slow branches of the Brewer-Dobson circulation and the reinforced barrier effect of the jet. At higher altitudes, the age spectrum exhibits the footprint of the annual modulation of the deep Brewer-Dobson circulation. The variability of the mean age is analysed through a decomposition in terms of annual cycle, QBO, ENSO and trend. The annual modulation is the dominating signal in the lower stratosphere and in the tropical pipe with amplitude up to one year. The phase of the oscillation is opposite in both hemisphere beyond 20° and is also reversed below and above 25 km with maximun arising in mid-March in the Northern Hemisphere and in mid-September in the Southern Hemisphere. The tropical pipe signal is in phase with the lower southern stratosphere and the mid northern stratosphere. The maximum amplitude of the QBO modulation is of about 0.5 yr and is mostly concentrated within the tropics between 25 and 35 km. It lags the QBO wind at 30 hPa by about 8 months. The ENSO signal is small and limited to the lower northen stratosphere. The trend is significant and negative, of the order of -0.3 to -0.5 yr dec-1, within the lower stratosphere in the Southern Hemisphere and under 40° N in the Northern Hemisphere below 25 km. It is positive (of the order of 0.3 yr dec-1) in the mid stratosphere but there is no region of consistent significance. This suggests that the shallow and deep Brewer-Dobson circulations may evolve in

  7. Unpublished Interim Digital Geologic Map of Hot Springs National Park and Vicinity, Arkansas (NPS, GRD, GRI, HOSP, HOSP digital map) adapted from the interim Arkansas Geological Survey DGM-HSR-003 by Johnson and Hanson (2011)

    Data.gov (United States)

    National Park Service, Department of the Interior — The Unpublished Interim Digital Geologic Map of Hot Springs National Park and Vicinity, Arkansas is composed of GIS data layers complete with ArcMap 9.3 layer...

  8. Fermín Peraza Sarausa, bibliógrafo y bibliotecólogo

    OpenAIRE

    Rivera, Zoia; Silva Crespo, Aimee

    2007-01-01

    An outline of the life, work and thought of Fermín Peraza Sarausa, one of the most eminent Cuban bibliographers and director of the Municipal Library of Havana for more than 25 years is presented. The role he played as an innovator and in the introduction of the best experiences of the library practice of the avanguard countries in Cuba is stressed. His work as publisher of the " Anuario Bibliográfico " (Bibliographical Yearbook) and his contribution to the training of librarians in Cuba is a...

  9. On-site or off-site treatment of medical waste: a challenge.

    Science.gov (United States)

    Taghipour, Hassan; Mohammadyarei, Taher; Asghari Jafarabadi, Mohamad; Asl Hashemi, Ahmad

    2014-01-01

    Treating hazardous-infectious medical waste can be carried out on-site or off-site of health-care establishments. Nevertheless, the selection between on-site and off-site locations for treating medical waste sometimes is a controversial subject. Currently in Iran, due to policies of Health Ministry, the hospitals have selected on-site-treating method as the preferred treatment. The objectives of this study were to assess the current condition of on-site medical waste treatment facilities, compare on-site medical waste treatment facilities with off-site systems and find the best location of medical waste treatment. To assess the current on-site facilities, four provinces (and 40 active hospitals) were selected to participate in the survey. For comparison of on-site and off-site facilities (due to non availability of an installed off-site facility) Analytical Hierarchy Process (AHP) was employed. The result indicated that most on-site medical waste treating systems have problems in financing, planning, determining capacity of installations, operation and maintenance. AHP synthesis (with inconsistency ratio of 0.01 < 0.1) revealed that, in total, the off-site treatment of medical waste was in much higher priority than the on-site treatment (64.1% versus 35.9%). According to the results of study it was concluded that the off-site central treatment can be considered as an alternative. An amendment could be made to Iran's current medical waste regulations to have infectious-hazardous waste sent to a central off-site installation for treatment. To begin and test this plan and also receive the official approval, a central off-site can be put into practice, at least as a pilot in one province. Next, if it was practically successful, it could be expanded to other provinces and cities. PMID:24739145

  10. Development of the on-site power supply in German nuclear power plants

    International Nuclear Information System (INIS)

    The design of the on-site power supply is different in German Nuclear Power Plants, depending on age and size of the plant. The cause for this is the evolution of the safety requirements. The general development of the design of safety Systems, which resulted in a strict separation of redundant trains is also reflected in the design of the emergency power system and even the complete on-site power supply System. This will be demonstrated by different examples. The advantages of this design with respect to the availability of on-site power will be explained and verified by means of operating experience. (author)

  11. 78 FR 59726 - Interim Final Appendix D of OMB Circular No. A-123, “Management's Responsibility for Internal...

    Science.gov (United States)

    2013-09-27

    ... Internal Control,'' defines management's responsibility for internal control in Federal agencies. OMB... From the Federal Register Online via the Government Publishing Office OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's Responsibility for...

  12. 77 FR 24857 - Interim Final Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-26

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Interim final... Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State... Part 52 Environmental protection, Air pollution control, Intergovernmental regulations,...

  13. Dedicated-site, interim storage of high-level nuclear waste as part of the management system.

    Science.gov (United States)

    Zen, E A

    1980-11-01

    Dedicated-site interim storage of high-level reprocessed nuclear waste and of spent fuel rods is proposed as a long-term integral part of the systems approach of the national nuclear waste isolation program. Separation of interim sites for retrievable storage from permanent-disposal repositories should enhance ensurance of the performance of the latter; maintenance of retrievability at separate sites also has many advantages in both safety and possible use of waste as resources. Interim storage sites probably will not be needed beyond about 100 years from now, so the institutional and technical considerations involved in their choice should be much less stringent than those for the selection of permanent sites. Development of interim sites must be concurrent with unabated effort to identify and to develop permanent repositories.

  14. Detailed Rules for the Implementing the Interim Regulations of the People's Republic of China on Value-added Tax

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ Article 1 The Detailed Rules are formulated according to the provisions of the Interim Regulations of the People's Republic of Chi-na on Value-added Tax (hereinafter referred to as the Regulations).

  15. John Burton named interim director for distance learning and summer sessions; Learning Technologies formally partners with undergraduate education

    OpenAIRE

    Owczarski, Mark

    2010-01-01

    John K. Burton, professor of learning sciences and technology in the School of Education in the College of Liberal Arts and Human Sciences at Virginia Tech, has been named the university's interim director for distance learning and summer sessions.

  16. On-site toxicity of irrigation drainwater from Stillwater National Wildlife Refuge to aquatic organisms

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The toxicity of water from seven locations in the Stillwater Wildlife Management Area was evaluated in a series of on-site tests conducted over a 10 day period with...

  17. 77 FR 4368 - Abbott Laboratories, Diagnostics Division, Including On-Site Leased Workers From Manpower...

    Science.gov (United States)

    2012-01-27

    ... Employment and Training Administration Abbott Laboratories, Diagnostics Division, Including On-Site Leased... for Worker Adjustment Assistance on February 24, 2011, applicable to workers of Abbott Laboratories... location of Abbott Laboratories, Diagnostics Division. The Department has determined that these...

  18. A sensitive rapid on-site immunoassay for heavy metal contamination

    Energy Technology Data Exchange (ETDEWEB)

    Blake, R.; Blake, D.; Flowers, G.

    1996-05-02

    This project concerns the development of immunoassays for heavy metals that will permit the rapid on-site analysis of specific heavy metals, including lead and chromium in water and soil samples. 2 refs.

  19. 78 FR 69878 - First Advantage Corporation, Including On-Site Leased Workers From Tapfin, Staffworks, Aerotek...

    Science.gov (United States)

    2013-11-21

    ... Employment and Training Administration First Advantage Corporation, Including On-Site Leased Workers From... Staffing, St. Petersburg, Florida; First Advantage Corporation, Charlotte, North Carolina, First Advantage Corporation, Bolingbrook, Illinois; First Advantage Corporation, Dallas, Texas; First Advantage...

  20. 75 FR 49526 - Halliburton Company, Duncan Mfg., Including On-Site Leased Workers from Express Personnel...

    Science.gov (United States)

    2010-08-13

    ... Employment and Training Administration Halliburton Company, Duncan Mfg., Including On-Site Leased Workers... Company, Technology and Engineering Division, Finance and Administration Division, Duncan, OK; Amended.... Workers of Halliburton Company, Technology and Engineering Division, and Finance and...

  1. New Technological Charts for Concreting Operations on Site for Civil Constructions

    OpenAIRE

    René Antonio Puig Martínez; Juan José Howland Albear

    2014-01-01

    The on site concreting of constructions, require some regulations to guide the construction companiesto execute the concreting operations according to the status and potential of existing technologies.In Cuba were used for a long time many regulations and construction technical standards issued bythe Ministry of Construction and relating companies, and was published in 1990 the only one versionof Technological Charts for concreting operations on site, about the existing constructions in Cuba,...

  2. Functions and requirements document for interim store solidified high-level and transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture, and interfaces.

  3. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, W.W.

    1997-12-30

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations.

  4. Criticality safety evaluation for long term storage of FFTF fuel in interim storage casks

    International Nuclear Information System (INIS)

    It has been postulated that a degradation phenomenon, referred to as ''hot cell rot'', may affect irradiated FFTF mixed plutonium-uranium oxide (MOX) fuel during dry interim storage. ''Hot cell rot'' refers to a variety of phenomena that degrade fuel pin cladding during exposure to air and inert gas environments. It is thought to be a form of caustic stress corrosion cracking or environmentally assisted cracking. Here, a criticality safety analysis was performed to address the effect of the ''hot cell rot'' phenomenon on the long term storage of irradiated FFTF fuel in core component containers. The results show that seven FFTF fuel assemblies or six Ident-69 pin containers stored in core component containers within interim storage casks will remain safely subcritical

  5. Interim storage for spent fuel elements. Bavarian Higher Administrative Court, judgement of February 7, 1985

    International Nuclear Information System (INIS)

    Spent fuel, which can be reprocessed under the conditions of sec. 9 a (1) Atomic Energy Act, is not classified as radioactive waste but as radioactive residues. Their interim storage is not subject to the provisions for waste disposal of sec. 9 a et seq. Atomic Energy Act, but to those of sec. 5 et seq. Atomic Energy Act. The construction and operation of a compact fuel storage in a cooling pond for the purpose of interim storage of irradiated fuel is subject to a licence pursuant to sec. 7 (1) Atomic Energy Act. External effects on a compact storage due to an incident 'plane crash' are to be attributed to the scope of residual risk because of the special precautions already considered within the design criteria and because of the comparatively favourable site of the plant Isar 1 at Ohu. (orig./HSCH)

  6. Safety features of proposed concepts for spent fuel dry interim storage

    International Nuclear Information System (INIS)

    Whichever solution is selected for the back-end of the fuel cycle, increasing quantities of spent fuel have often to be stored interim for rather long periods of time. Public acceptance of the corresponding storage facilities becomes more and more an important concern for all involved utilities in various countries. The fact that several governments have already issued sets of storage criteria which show significant differences with each other constitutes a weakness for all of them in front of their own population which no longer knows whom to believe. Therefore the need of an international consensus on basic rules and criteria for the safe interim storage of spent fuel has now become really urgent. The paper gives a brief view on this problem. (author)

  7. Dynamics of Flexible Rotor Systems with an Interim Mass Unbalanced Disk Using a Spectral Element Model

    Directory of Open Access Journals (Sweden)

    Sangkyu Choi

    2014-01-01

    Full Text Available A frequency domain spectral element model is developed for a rotor system that consists of two spinning shafts and an interim disk or blade system. In this study, the shafts are represented by spinning Timoshenko beam models, and the interim disk system is represented by a uniform thick rigid disk with an unbalanced mass. In our derivation of the governing equations of motion of the disk system, the disk is considered to be wobbling about the geometric center of the disk at which the spinning shafts are attached. The high accuracy of the proposed spectral element model is evaluated by comparison with the natural frequencies obtained using the conventional finite element method (FEM. The spectral element model is then used to investigate the effects of the unbalanced mass on the natural frequencies and dynamic responses of an example rotor system.

  8. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    International Nuclear Information System (INIS)

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste

  9. FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Barnitt, R.

    2010-05-01

    This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

  10. Financial compensation for municipalities hosting interim or final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Brazilian Law No. 10308 issued November 20, 2001, establishes in its 34th article that 'those municipalities hosting interim or final disposal facilities for radioactive waste are eligible to receive a monthly payment as compensation'. The values of due payments depend on parameters such as volume of wastes and activity and half-lives of the radionuclides. The method to calculating those values was established by the National Commission on Nuclear Energy, the Brazilian regulatory authority, by Resolution No. 10, issued in the August 18, 2003. In this paper we report the application of that method to a low- and intermediate-level radioactive waste interim storage facility at the Nuclear Energy Research Institute. (author)

  11. 400-MWe Consolidated Nuclear Steam System (CNSS). 1200-MWt Phase 2A interim studies. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    1978-09-01

    The Phase 2A interim studies of the Consolidated Nuclear Steam System (CNSS) consisted of a number of separate task studies addressing the design concepts developed during the Phase 1 study reported in BAW--1445. The purpose of the interim studies was to better establish overall concept feasibility from both a hardware and economic standpoint, to make modification and additions to the design where appropriate, and to understand and reduce the technical risks in critical areas of the design. The work on these task studies included input from Barberton, Mt. Vernon, and the Alliance Research Center as well as United Engineers and Constructors (UE and C). The UE and C work was carried out under a separate DOE contract.

  12. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    International Nuclear Information System (INIS)

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations

  13. Explanation of procedure on site medical emergency response for nuclear accident

    International Nuclear Information System (INIS)

    National occupational health standard-Procedure on Site Medical Emergency Response for Nuclear Accident has been approved and issued by the Ministry of Health. This standard is formulated according to the Emergency Response Law of the People's Republic of China, Law of the People 's Republic of China on Prevention and Control of Occupational Diseases, Regulations on Emergency Measures for Nuclear Accidents at Nuclear Power Plants, and Health Emergency Plans for Nuclear and Radiological Accidents of Ministry of Health, supporting the use of On-site Medical Emergency Planning and Preparedness for Nuclear Accidents and Off-site Medical Emergency Planning and Preparedness for Nuclear Accidents. Nuclear accident on-site medical response procedure is a part of the on-site emergency plan. The standard specifies the basic content and requirements of the nuclear accident on-site medical emergency response procedures of nuclear facilities operating units to guide and regulate the work of nuclear accident on-site medical emergency response of nuclear facilities operating units. The criteria-related contents were interpreted in this article. (authors)

  14. Value of biomedical scientists providing on-site specimen adequacy assessment for fine-needle aspirations.

    Science.gov (United States)

    Narine, N; Rana, D N; Perera, D M; Irshad, A

    2012-01-01

    Fine-needle aspiration (FNA) is accepted as a first-line investigation in patients with superficial or deep-seated mass lesions. One of the fundamental principles of successful aspiration is harvesting sufficient numbers of cells that are representative of the lesion being investigated. Central Manchester University Hospitals NHS Foundation Trust provides FNA services to Christie Hospital, including non-attended and biomedical scientist-attended aspirations, some of which are assessed on-site for specimen adequacy. This study audits the FNA coverage provided to Christie Hospital by exploring the contribution of biomedical scientist on-site specimen adequacy assessment to successful aspirations and identifies potential areas for service improvement such that unsatisfactory sampling is reduced. Satisfactory sampling rates varied between biomedical scientist-attended (79%) and non-attended (70%) procedures. Within the former group, 100% satisfactory sampling was achieved with on-site assessment, falling to 77% without on-site assessment. The highest unsatisfactory sampling rate was identified at 33% for thyroid aspirations in endocrinology, while rates elsewhere varied between 21% and 23%. This audit demonstrated the value of on-site specimen adequacy assessment as the ultimate goal of any FNA is to negate the need for more invasive procedures. In terms of flexibility and economic value, having adequately trained biomedical scientists to perform on-site assessment is quite feasible. Extending this biomedical scientist-led service to other departments would reduce unsatisfactory sample rates and the requirement for more invasive procedures. PMID:23057157

  15. 200 Area stack contamination. Interim report, August 2, 1948--October 11, 1948

    Energy Technology Data Exchange (ETDEWEB)

    Lapple, C.E.

    1948-10-11

    In connection with the problem of eliminating contamination of the atmosphere by the exhaust from the 221 Building ventilation air stacks, sand filters were previously recommended. Construction of a sand filter in West Area is about completed and construction of a filter in East Area is well underway. This report summarizes the status, technical findings, and comments and suggestions since the writer`s last Interim Report, dated August 6, 1948, was issued.

  16. Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans

    Science.gov (United States)

    Naud, Catherine M.; Booth, James F.; Del Genio, Anthony D.

    2014-01-01

    The Southern Ocean cloud cover modeled by the Interim ECMWF Re-Analysis (ERA-Interim) and Modern- Era Retrospective Analysis for Research and Applications (MERRA) reanalyses are compared against Moderate Resolution Imaging Spectroradiometer (MODIS) and Multiangle Imaging Spectroradiometer (MISR) observations. ERA-Interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the cloud amount. For a compositing analysis of clouds in warm season extratropical cyclones, both reanalyses show a low bias in cloud cover. They display a larger bias to the west of the cyclones in the region of subsidence behind the cold fronts. This low bias is larger for MERRA than for ERA-Interim. Both MODIS and MISR retrievals indicate that the clouds in this sector are at a low altitude, often composed of liquid, and of a broken nature. The combined CloudSat-Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) cloud profiles confirm these passive observations, but they also reveal that low-level clouds in other parts of the cyclones are also not properly represented in the reanalyses. The two reanalyses are in fairly good agreement for the dynamic and thermodynamic characteristics of the cyclones, suggesting that the cloud, convection, or boundary layer schemes are the problem instead. An examination of the lower-tropospheric stability distribution in the cyclones from both reanalyses suggests that the parameterization of shallow cumulus clouds may contribute in a large part to the problem. However, the differences in the cloud schemes and in particular in the precipitation processes, which may also contribute, cannot be excluded.

  17. Comprehensive Medical Management of Rosacea: An Interim Study Report and Literature Review

    OpenAIRE

    Del Rosso, James Q.; Baum, Eric W.

    2008-01-01

    Rosacea is a common inflammatory facial dermatosis seen in adults that exhibits considerable variety in clinical presentation. Multiple medical therapeutic options are available including topical and oral treatments. Optimal medical management of rosacea includes assessment of subtype and disease severity and use of appropriate skin care to reduce epidermal barrier dysfunction. This article provides an overall discussion of the medical management of rosacea and reviews interim results from a ...

  18. Record of Decision Colorado River Interim Surplus Guidelines Final Environmental Impact Statement

    OpenAIRE

    Secretary of the Department of the Interior

    2001-01-01

    This document constitutes the Record of Decision (ROD) of the Department of the Interior, regarding the preferred alternative for Colorado River Interim Surplus Guidelines (Guidelines). The Secretary of the Interior (Secretary) is vested with the responsibility of managing the mainstream waters of the lower Colorado River pursuant to federal law. This responsibility is carried out consistent with applicable federal law. Reclamation, as the agency that is designated to act on the Secretary’s b...

  19. Interim sanitary landfill groundwater monitoring report. First and second quarters 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. This document contains the analytical groundwater sampling data for these eight wells for the first two quarters of 1996.

  20. An Evaluation of the Individual Training Account/Eligible Training Provider Demonstration. Final Interim Report.

    OpenAIRE

    Ronald D'Amico; Alexandria Martinez; Jeffrey Salzman; Robin Wagner

    2001-01-01

    Presents interim findings from an evaluation of 13 grantees' efforts to deliver training services through the use of Individual Training Accounts, which participants can use to procure the training of their choice, as long as it is state-approved. Describes policies and practices at about the midpoint of the grant period. Discusses how eligible programs were selected and reviews the information available to participants for use in making training choices.

  1. Development of a novel interim bulk fuel storage facility for the PBMR / W.F. Fuls

    OpenAIRE

    Fuls, Wilhelm Franz

    2004-01-01

    The PBMR is the first High Temperature Reactor being designed for commercial power generation in South Africa. It makes use of spherical fuel elements, containing coated uranium oxide particles encapsulated in a graphite matrix. The spent fuel generated from the reactor is stored in a storage system before final disposal. Such storage systems are called interim storage facilities, and normally make use of small transportable containers. The PBMR design makes use of bulk storage containers...

  2. Solid rocket technology advancement for Space Tug and IUS applications. [Interim Upper Stage

    Science.gov (United States)

    Ascher, W.; Bailey, R. L.; Behm, J. W.; Gin, W.

    1975-01-01

    Two-burn restartable solid propellant rocket motors for the kick stage (auxiliary stage) of the Shuttle Tug, or Interim Upper Stage, are described, with details on features and test results of the ignition and quench (thrust termination) systems and procedures, fabrication of propellant and insulation, explosion hazards of propellants, and comparative data on present and future motor design. These rocket motor systems are designed for upper stage augmentation of launch vehicles and possible service in Shuttle-launched outer planet spacecraft.

  3. Interim Storage of Spent Nuclear Fuel before Final Disposal in Germany - Regulator's view

    International Nuclear Information System (INIS)

    For spent nuclear fuel management in Germany the concept of dry interim storage in dual purpose casks before direct disposal is applied. The Federal Office for Radiation Protection (BfS) is the competent authority for licensing of interim storage facilities. The competent authority for surveillance of operation is the responsible authority of the respective federal state (Land). Currently operation licenses for storage facilities have been granted for a storage time of 40 years and are based on safety demonstrations for all safety issues as safe enclosure, shielding, sub-criticality and decay heat removal under consideration of operation conditions. In addition, transportability of the casks for the whole storage period has to be provided. Due to current delay in site selection and exploration of a disposal site, an extension of the storage time beyond 40 years could be needed. This will cause appropriate actions by the licensee and the competent authorities as well. A brief description of the regulatory base of licensing and surveillance of interim storage is given from the regulators view. Furthermore the current planning for final disposal of spent nuclear fuel and high level waste and its interconnections between storage and disposal concepts are shortly explained. Finally the relevant aspects for licensing of extended storage time beyond 40 years will be discussed. Current activities on this issue, which have been initiated by the Federal Government, will be addressed. On the regulatory side a review and amendment of the safety guideline for interim storage of spent fuel has been performed and the procedure of periodic safety review is being implemented. A guideline for implementing an ageing management programme is available in a draft version. Regarding safety of long term storage a study focussing on the identification and evaluation of long term effects as well as gaps of knowledge has been finished in 2010. A continuation and update is currently underway

  4. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  5. Operations and Maintenance Concept Plan for the Immobilized High-Level Waste (IHLW) Interim Storage Facility

    International Nuclear Information System (INIS)

    This OandM Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design

  6. Seismic Safety Margins Research Program. Phase I. Interim definition of terms

    International Nuclear Information System (INIS)

    This report documents interim definitions of terms in the Seismic Safety Margins Research Program (SSMRP). Intent is to establish a common-based terminology integral to the probabilistic methods that predict more realistically the behavior of nuclear power plants during an earthquake. These definitions are a response to a request by the Nuclear Regulatory Commission Advisory Committee on Reactor Safeguards at its meeting held November 15-16, 1979

  7. Detailed Rules for Implementing the Interim Regulations of the People's Republic of China on Business Tax

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ Article 1 The Detailed Rules are formulated in accordance with the Interim Regulations of the People's Republic of China on Busi-ness Tax (hereinafter referred to as the Regulations). Article 2 "Services" as mentioned in Article 1 of the Regulations refers to services within the scope of taxable items in the trans-portation, construction, finance and insurance, posts and tele-communications, culture and sports, entertainment and service industries (hereinafter referred to as taxable services).

  8. The British Society of Gastroenterology early gastric cancer/dysplasia survey: an interim report.

    OpenAIRE

    De Dombal, F T; Price, A. B.; Thompson, H; Williams, G. T.; Morgan, A G; Softley, A; Clamp, S E; Unwin, B J

    1990-01-01

    This presentation describes interim findings in a series of 319 patients referred from 41 hospitals on the basis of histopathological findings of 'early gastric cancer', 'dysplasia', or 'worrying mucosal appearances'. Data were recorded using a predefined proforma, and histopathological material circulated amongst a 'panel' of three further pathologists. After this process, 132 patients were classified as having early gastric cancer and 63 as dysplasia. There was good agreement between pathol...

  9. Dry interim spent fuel storage casks. Licensing, evaluation and operational experience

    International Nuclear Information System (INIS)

    The German concept for the external dry interim storage of spent fuel and high level wastes is based on the used of monolithic ductile iron casks which are licensed according to the transport regulations and the national Atomic Energy Act. The casks ensure the safe confinement of the radioactive inventory over long term storage periods of up to 40 years. Essential for that purpose is the double barrier containment system, consisting of two independent lids sealed with long term resistant metallic gaskets and equipped with an interspace pressure monitoring device. Since the establishment of this dry interim storage concept in Germany in the early 1980s, a great deal of experience has been accumulated and now spent fuel elements from the THTR reactor at Hamm-Uentrop and from the AVR research reactor at Juelich are loaded into CASTOR-THTR/AVR casks under dry conditions and stored in the licensed external dry interim storage facilities in Ahaus and Juelich. These are now routine procedures that started in 1992 and has so far comprise more than 200 casks. A great deal of operational experience exists and has also been gained in process optimization without any serious problems. Much more difficult are the drying and evacuation procedures for casks loaded under wet conditions in the spent fuel storage pond of a nuclear power plant. In this case, special operational procedures involving humidity measurements are applied. Different loading operations in several German power plants have been carried out since 1982 and the first wet loaded cask proposed for storage in the licensed external dry interim storage facility at Gorleben came into operation in July 1994. (author). 4 refs, 5 figs, 1 tab

  10. Evaluation of the Flexural Strength of Interim Restorative Materials in Fixed Prosthodontics

    Science.gov (United States)

    Mehrpour, Hanieh; Farjood, Ehsan; Giti, Rashin; Barfi Ghasrdashti, Alireza; Heidari, Hossein

    2016-01-01

    Statement of the Problem Mechanical properties of interim restorations are considered as important factors specially when selecting materials for long-term application or for patients with para-functional habits. Flexural strength is one of the most important components of these restorations. Purpose The purpose of this study was to compare the flexural strength of five interim restorative materials. Materials and Method Fifty identical samples sized 25×2×2-mm were made from five interim materials (TempSpan; Protemp 4, Unifast III, Trim, and Revotek LC) according to ADA specification #27. The specimens were stored in artificial saliva for 2 weeks and then thermocycled for 2500 cycles (5-55˚C). A standard three-point bending test was conducted on the specimens with a universal testing machine at a crosshead speed of 0.75mm/min. Data were analyzed by using one-way ANOVA and Tamhane’s post-hoc tests to measure the flexural strength of temporary materials. Results One of the bis-acryl resins (TempSpan) showed the highest, and the light polymerized resin (Revotek LC) showed the lowest flexural strength. The mean values of flexural strength (MPa) for the examined materials were as follow: TempSpan=120.00, Protemp 4=113.00, Unifast III=64.20, Trim= 63.73 and Revotek LC=47.16. There were significant differences between all materials except Trim and Unifast III which did not show any statistical significant difference. Conclusion Bis-acryl resins were statistically superior to traditional methacrylate and light-cured resins. Therefore, application of bis-acryl resins should be deliberated in patients with heavy occlusion and in cases that need long-term use of interim restorations. PMID:27602395

  11. Democratic Republic of the Congo; Interim Poverty Reduction Strategy Paper Preparation Status Report

    OpenAIRE

    International Monetary Fund

    2004-01-01

    In this paper, the implementation of the activities under the interim poverty reduction strategy and progress toward the elaboration of poverty reduction strategy are described. Institutional framework is strengthened by the creation of the inter-ministerial committee on the implementation of the National Strategy for Poverty Reduction. The goal is to identify priorities and strategies at the community level, and their capacity to operationalize sectoral and thematic poverty reduction strateg...

  12. Wide-Field InfraRed Survey Telescope (WFIRST) Interim Report

    CERN Document Server

    Green, James; Baltay, Charles; Bean, Rachel; Bennett, David; Brown, Robert; Conselice, Christopher; Donahue, Megan; Gaudi, Scott; Lauer, Tod; Perlmutter, Saul; Rauscher, Bernard; Rhodes, Jason; Roellig, Thomas; Stern, Daniel; Sumi, Takahiro; Tanner, Angelle; Wang, Yun; Wright, Edward; Gehrels, Neil; Sambruna, Rita; Traub, Wesley

    2011-01-01

    In December 2010, NASA created a Science Definition Team (SDT) for WFIRST, the Wide Field Infra-Red Survey Telescope, recommended by the Astro 2010 Decadal Survey as the highest priority for a large space mission. The SDT was chartered to work with the WFIRST Project Office at GSFC and the Program Office at JPL to produce a Design Reference Mission (DRM) for WFIRST. This paper describes an Interim DRM. The DRM will be completed in 2012.

  13. Surface Water Interim Measures/Interim Remedial Action Plan/ Environmental and Decision Document, South Walnut Creek Basin, Operable Unit No.2

    International Nuclear Information System (INIS)

    Water quality investigations have identified the presence of volatile organic compound (VOC) and radionuclide contamination of surface water at the Rocky Flats Plant (RFP). The subject interim Measures/Interim Remedial Action Plan/Environmental Assessment (IM/IRAP/EA) addresses contaminated surface water in a portion of the South Walnut Creek drainage basin located within an area identified as Operable Unit No. 2 (OU 2). There is no immediate threat to public health and the environment posed by this surface water contamination. The affected surface water is contained within the plant boundary by existing detention ponds, and is treated prior to discharge for removal of volatile contaminants and suspended particulates to which radionuclides, if present, are likely to absorb. However, there is a potential threat and the Department of Energy (DOE) is implementing this Surface Water IM/IRAP at the request of the US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH). Implementation of the Surface Water IM/IRA will enhance the DOE's efforts towards containing and managing contaminated surface water, and will mitigate downgradient migration of contaminants. Another factor in implementing this IM/IRA is the length of time it will take to complete the investigations and engineering studies necessary to determine the final remedy for OU 2. 44 refs., 23 figs., 14 tabs

  14. The role of interim storage facilities in the nuclear waste management policy of Germany

    International Nuclear Information System (INIS)

    The article discusses the role of interim storage of spent fuel elements in the current nuclear waste management policy in Germany, and possible demand for additional interim storage facilities in the future, as a consequence of the shift in the radioactive waste disposal concept and the nuclear power opt-out policy of the Federal Government. Success or failure of the consensus on the nuclear power phase-out strategy, agreed between the Federal Government and the nuclear power industry on 14 June 2000, hinges not only but essentially on the availability of sufficient interim storage facilities for spent fuel elements accrued over the negotiated remaining operating periods of nuclear power plants. The NPP operators say the present radioactive waste management concept has to be put on a different basis and needs amending in response to the change in energy policy. For the electric utilities, the crucial test is whether the Federal Government will be able to fulfill their promise made during the consensus negotiations, namely that there will be no premature shutdowns of nuclear power plants because of a bottleneck in spent fuel storage capacity. (orig./CB)

  15. Safety of interim storage solutions of used nuclear fuel during extended term

    International Nuclear Information System (INIS)

    In 2013, the total amount of stored used nuclear fuel (UNF) in the world will reach 225,000 T HM. The UNF inventory in wet storage will take up over 80% of the available total spent fuel pool (SFP) capacity. Interim storage solutions are needed. They give flexibility to the nuclear operators and ensure that nuclear reactors continue to operate. However, we need to keep in mind that they are also an easy way to differ final decision and implementation of a UNF management approach (recycling or final disposal). In term of public perception, they can have a negative impact overtime as it may appear that nuclear industry may have significant issues to resolve. In countries lacking an integrated UNF management approach, the UNF are being discharged from the SFPs to interim storage (mostly to dry storage) at the same rate as UNF is being discharged from reactors, as the SFPs at the reactor sites are becoming full. This is now the case in USA, Taiwan, Switzerland, Spain, South Africa and Germany. For interim storage, AREVA has developed different solutions in order to allow the continued operation of reactors while meeting the current requirements of Safety Authorities: -) Dry storage canisters on pads, -) Dual-purpose casks (dry storage and transportation), -) Vault dry storage, and -) Centralized pool storage

  16. Lessons learned from the Siting Process of an Interim Storage Facility in Spain - 12024

    Energy Technology Data Exchange (ETDEWEB)

    Lamolla, Meritxell Martell [MERIENCE Strategic Thinking, 08734 Olerdola, Barcelona (Spain)

    2012-07-01

    On 29 December 2009, the Spanish government launched a site selection process to host a centralised interim storage facility for spent fuel and high-level radioactive waste. It was an unprecedented call for voluntarism among Spanish municipalities to site a controversial facility. Two nuclear municipalities, amongst a total of thirteen municipalities from five different regions, presented their candidatures to host the facility in their territories. For two years the government did not make a decision. Only in November 30, 2011, the new government elected on 20 November 2011 officially selected a non-nuclear municipality, Villar de Canas, for hosting this facility. This paper focuses on analysing the factors facilitating and hindering the siting of controversial facilities, in particular the interim storage facility in Spain. It demonstrates that involving all stakeholders in the decision-making process should not be underestimated. In the case of Spain, all regional governments where there were candidate municipalities willing to host the centralised interim storage facility, publicly opposed to the siting of the facility. (author)

  17. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  18. Early interim {sup 18}F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    Energy Technology Data Exchange (ETDEWEB)

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele [University of Bologna, Institute of Hematology and Medical Oncology ' ' L. e A. Seragnoli' ' , Policlinico ' ' Sant' Orsola-Malpighi' ' , Bologna (Italy); Rigacci, Luigi; Puccini, Benedetta [Azienda Ospedaliero Universitaria ' ' Careggi' ' , Hematology Department, Florence (Italy); Castagnoli, Antonio [Ospedale ' ' Misericordia e Dolce' ' , Nuclear Medicine, Prato (Italy); Vaggelli, Luca [Azienda Ospedaliero Universitaria ' ' Careggi' ' , Nuclear Medicine, Florence (Italy); Zanoni, Lucia; Fanti, Stefano [Policlinico ' ' Sant' Orsola-Malpighi' ' , Department of Nuclear Medicine, Bologna (Italy)

    2012-01-15

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  19. Assessment of On-Site Power Opportunities in the Industrial Sector

    Energy Technology Data Exchange (ETDEWEB)

    Bryson, T.

    2001-10-08

    The purpose of this report is to identify the potential for on-site power generation in the U.S. industrial sector with emphasis on nine industrial groups called the ''Industries of the Future'' (IOFs) by the U.S. Department of Energy (DOE). Through its Office of Industrial Technologies (OIT), the DOE has teamed with the IOFs to develop collaborative strategies for improving productivity, global competitiveness, energy usage and environmental performance. Total purchases for electricity and steam for the IOFs are in excess of $27 billion annually. Energy-related costs are very significant for these industries. The nine industrial groups are (1) Agriculture (SIC 1); (2) Forest products; (3) Lumber and wood products (SIC 24); (4) Paper and allied products (SIC 26); (5) Mining (SIC 11, 12, 14); (6) Glass (SIC 32); (7) Petroleum (SIC 29); (8) Chemicals (SIC 28); and (9) Metals (SIC 33): Steel, Aluminum, and Metal casting. Although not currently part of the IOF program, the food industry is included in this report because of its close relationship to the agricultural industry and its success with on-site power generation. On-site generation provides an alternative means to reduce energy costs, comply with environmental regulations, and ensure a reliable power supply. On-site generation can ease congestion in the local utility's electric grid. Electric market restructuring is exacerbating the price premium for peak electricity use and for reliability, creating considerable market interest in on-site generation.

  20. Assessment of On-Site Power Opportunities in the Industrial Sector; TOPICAL

    International Nuclear Information System (INIS)

    The purpose of this report is to identify the potential for on-site power generation in the U.S. industrial sector with emphasis on nine industrial groups called the ''Industries of the Future'' (IOFs) by the U.S. Department of Energy (DOE). Through its Office of Industrial Technologies (OIT), the DOE has teamed with the IOFs to develop collaborative strategies for improving productivity, global competitiveness, energy usage and environmental performance. Total purchases for electricity and steam for the IOFs are in excess of$27 billion annually. Energy-related costs are very significant for these industries. The nine industrial groups are: (1) Agriculture (SIC 1); (2) Forest products; (3) Lumber and wood products (SIC 24); (4) Paper and allied products (SIC 26); (5) Mining (SIC 11, 12, 14); (6) Glass (SIC 32); (7) Petroleum (SIC 29); (8) Chemicals (SIC 28); and (9) Metals (SIC 33)-Steel, Aluminum, Metal casting. Although not currently part of the IOF program, the food industry is included in this report because of its close relationship to the agricultural industry and its success with on-site power generation. On-site generation provides an alternative means to reduce energy costs, comply with environmental regulations, and ensure a reliable power supply. On-site generation can ease congestion in the local utility's electric grid. Electric market restructuring is exacerbating the price premium for peak electricity use and for reliability, creating considerable market interest in on-site generation

  1. 78 FR 15049 - The Evercare Company Including On-Site Leased Workers From Global Personnel Solutions and...

    Science.gov (United States)

    2013-03-08

    ... Employment and Training Administration The Evercare Company Including On-Site Leased Workers From Global... Company, including on-site leased workers from Global Personnel Solutions and Manpower, Waynesboro... Evercare Company, Waynesboro, Georgia (subject firm). The subject worker group included on-site...

  2. On-Site Inspection RadioIsotopic Spectroscopy (Osiris) System Development

    Energy Technology Data Exchange (ETDEWEB)

    Caffrey, Gus J. [Idaho National Laboratory, Idaho Falls, ID (United States); Egger, Ann E. [Idaho National Laboratory, Idaho Falls, ID (United States); Krebs, Kenneth M. [Idaho National Laboratory, Idaho Falls, ID (United States); Milbrath, B. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jordan, D. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Warren, G. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilmer, N. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-01

    We have designed and tested hardware and software for the acquisition and analysis of high-resolution gamma-ray spectra during on-site inspections under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The On-Site Inspection RadioIsotopic Spectroscopy—Osiris—software filters the spectral data to display only radioisotopic information relevant to CTBT on-site inspections, e.g.,132I. A set of over 100 fission-product spectra was employed for Osiris testing. These spectra were measured, where possible, or generated by modeling. The synthetic test spectral compositions include non-nuclear-explosion scenarios, e.g., a severe nuclear reactor accident, and nuclear-explosion scenarios such as a vented underground nuclear test. Comparing its computer-based analyses to expert visual analyses of the test spectra, Osiris correctly identifies CTBT-relevant fission product isotopes at the 95% level or better.The Osiris gamma-ray spectrometer is a mechanically-cooled, battery-powered ORTEC Transpec-100, chosen to avoid the need for liquid nitrogen during on-site inspections. The spectrometer was used successfully during the recent 2014 CTBT Integrated Field Exercise in Jordan. The spectrometer is controlled and the spectral data analyzed by a Panasonic Toughbook notebook computer. To date, software development has been the main focus of the Osiris project. In FY2016-17, we plan to modify the Osiris hardware, integrate the Osiris software and hardware, and conduct rigorous field tests to ensure that the Osiris system will function correctly during CTBT on-site inspections. The planned development will raise Osiris to technology readiness level TRL-8; transfer the Osiris technology to a commercial manufacturer, and demonstrate Osiris to potential CTBT on-site inspectors.

  3. Development of dual-purpose metal cask for interim storage of spent nuclear fuel (1). Outline of cask structure

    International Nuclear Information System (INIS)

    Spent fuels discharged from nuclear power plants in Japan are planed to be reprocessed at the nuclear fuel recycle plant under construction at Rokkasho-mura. Since the amount of the spent fuels exceeds that of recycled fuel, the spent fuels have to be properly stored and maintained as recycle fuel resource until the beginning of the reprocessing. For that sake, interim storage installations are being constructed outside the nuclear power plants by 2010. The storage dry casks have been practically used as the interim storage in the nuclear power plants. From this reason, the storage system using the storage dry casks is promising as the interim storage installations away form the reactors, which are under discussion. In the interim storage facilities, the storage using the dry cask of the storage metal cask with business showings, having the function of transportation is now under discussion. By employing transportation and storage dual-purpose cask, the repack equipments can be exhausted, and the reliability of the interim storage installations can be increased. Hitachi, Ltd. has been developing the high reliable and economical transportation and storage dry metal cask. In this report, the outline of our developing transportation and storage dry cask is described. (author)

  4. Analytical evaluation of a rapid on-site oral fluid drug test

    OpenAIRE

    Goessaert, An-Sofie; Pil, Kristof; Veramme, Jolien; Verstraete, Alain

    2010-01-01

    There is a need for a reliable rapid on-site oral fluid test that can be used in police controls to detect impaired drivers. We evaluated the Varian OralabA (R) 6 and collected two oral fluid samples from 250 subjects, one with the Varian OralabA (R) 6 and one with the StatSure (TM) SalivaaEuro cent Sampler (TM). The OralabA (R) 6 can detect six drug types: amphetamines, methamphetamine, cocaine, opiates, delta9-tetrahydrocannabinol (THC), and phencyclidine (PCP). On-site results were obtaine...

  5. Safety report for Central Interim Storage facility for radioactive waste from small producers

    International Nuclear Information System (INIS)

    In 1999 the Agency for Radwaste Management took over the management of the Central Interim Storage (CIS) in Brinje, intended only for radioactive waste from industrial, medical and research applications. With the transfer of the responsibilities for the storage operation, ARAO, the new operator of the facility, received also the request from the Slovenian Nuclear Safety Administration for refurbishment and reconstruction of the storage and for preparation of the safety report for the storage with the operational conditions and limitations. In order to fulfill these requirements ARAO first thoroughly reviewed the existing documentation on the facility, the facility itself and the stored inventory. Based on the findings of this review ARAO prepared several basic documents for improvement of the current conditions in the storage facility. In October 2000 the Plan for refurbishment and modernization of the CIS was prepared, providing an integral approach towards remediation and refurbishment of the facility, optimization of the inventory arrangement and modernization of the storage and storing utilization. In October 2001 project documentation for renewal of electric installations, water supply and sewage system, ventilation system, the improvements of the fire protection and remediation of minor defects discovered in building were completed according to the Act on Construction. In July 2003 the safety report was prepared, based on the facility status after the completion of the reconstruction works. It takes into account all improvements and changes introduced by the refurbishment and reconstruction of the facility according to project documentation. Besides the basic characteristics of the location and its surrounding, it also gives the technical description of the facility together with proposed solutions for the renewal of electric installations, renovation of water supply and sewage system, refurbishment of the ventilation system, the improvement of fire

  6. International Peer Review of Swedish Nuclear Fuel and Waste Management Company's SR-Can interim report

    International Nuclear Information System (INIS)

    SKB has produced an interim safety assessment report as part of its work to develop a licence application for the construction of a spent nuclear fuel encapsulation plant. The purpose of the interim report is to set out and demonstrate SKB's proposed methodology for long-term safety assessment. The aim of producing an interim report is to allow the Swedish regulatory authorities (SKI and SSI) to review and comment on SKB's proposed methodology before it is used in support of a formal licence application. To help inform their review of SKB's proposed methodology, the authorities appointed an international review team (IRT) to carry out a review of SKB's interim safety assessment report. Comments from the IRT are presented in this document and will be considered by the regulatory authorities in developing their own view of SKB's proposed methodology. The IRT's review included examination of SKB's documentation (the 'Interim Main Report of the Safety Assessment SR-Can' and four supporting documents) and hearings with SKB staff and contractors. The hearings provided an opportunity for the IRT to discuss the SR-Can safety assessment with the authors and contributors to SKB's work. As directed by SKI and SSI, the IRT's review focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology: (i) is fit for the purpose of supporting a licence application; (ii) has a reasonable prospect of leading to a safety assessment that is sufficiently comprehensive, reproducible, traceable and transparent; (iii) is compatible with the authorities' regulations and guidance. No evaluation of long term safety or site acceptability was attempted by the IRT. At the request of SKI and SSI, the IRT's review considered and made recommendations on the following issues: Description of the initial state of the repository and its components; Description of features, events and processes (FEPs) relevant to repository evolution; Strategy for safety

  7. T-TY Tank Farm Interim Surface Barrier Demonstration—Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-09-27

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy’s Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  8. Interim report on the accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (the Investigation Committee) of Tokyo Electric Power Company (TEPCO) was established by the Cabinet decision on May 24, 2011. Its objectives are: to conduct investigation for finding out the causes of accidents at the Fukushima Dai-ichi Nuclear Power Station (Fukushima Dai-ichi NPS) and Fukushima Dai-ni Nuclear Power Station (Fukushima Dai-ni NPS) of TEPCO as well as the causes of accident damage; and to make policy recommendations for limiting the expansion of damage and preventing reoccurrence of similar accidents. The Investigation Committee has conducted its investigation and evaluation since its first meeting on June 7, 2011. Its activities included: site visits to the Fukushima Dai-ichi and Dai-ni NPSs, as well as to other facilities; hearing of heads of local governments around the Fukushima Dai-ichi NPS; and hearing of people concerned through interviews mainly arranged by the Secretariat. As of December 16, 2011, the number of interviewees reached 456. The investigation and evaluation by the Investigation Committee are still ongoing and the Interim Report does not cover every item that the Committee aims at investigating and evaluating. Fact-finding of even some of those items discussed in the Interim Report are not yet completed. The Investigation Committee continues to conduct its investigation and evaluation and will issue its Final Report in the summer of 2012. This brief executive summary covers mainly considerations and evaluation of the issues in Chapter VII of the Interim Report, with brief reference to Chapters I to VI. The Investigation Committee recommendations are printed in bold. (author)

  9. On-Site Renewable Energy and Green Buildings: A System-Level Analysis.

    Science.gov (United States)

    Al-Ghamdi, Sami G; Bilec, Melissa M

    2016-05-01

    Adopting a green building rating system (GBRSs) that strongly considers use of renewable energy can have important environmental consequences, particularly in developing countries. In this paper, we studied on-site renewable energy and GBRSs at the system level to explore potential benefits and challenges. While we have focused on GBRSs, the findings can offer additional insight for renewable incentives across sectors. An energy model was built for 25 sites to compute the potential solar and wind power production on-site and available within the building footprint and regional climate. A life-cycle approach and cost analysis were then completed to analyze the environmental and economic impacts. Environmental impacts of renewable energy varied dramatically between sites, in some cases, the environmental benefits were limited despite the significant economic burden of those renewable systems on-site and vice versa. Our recommendation for GBRSs, and broader policies and regulations, is to require buildings with higher environmental impacts to achieve higher levels of energy performance and on-site renewable energy utilization, instead of fixed percentages. PMID:27031788

  10. Performance of on-site Medical waste disinfection equipment in hospitals of Tabriz, Iran

    Science.gov (United States)

    Taghipour, Hassan; Alizadeh, Mina; Dehghanzadeh, Reza; Farshchian, Mohammad Reza; Ganbari, Mohammad; Shakerkhatibi, Mohammad

    2016-01-01

    Background: The number of studies available on the performance of on-site medical waste treatment facilities is rare, to date. The aim of this study was to evaluate the performance of onsite medical waste treatment equipment in hospitals of Tabriz, Iran. Methods: A various range of the on-site medical waste disinfection equipment (autoclave, chemical disinfection, hydroclave, and dry thermal treatment) was considered to select 10 out of 22 hospitals in Tabriz to be included in the survey. The apparatus were monitored mechanically, chemically, and biologically for a six months period in all of the selected hospitals. Results: The results of the chemical monitoring (Bowie-Dick tests) indicated that 38.9% of the inspected autoclaves had operational problems in pre-vacuum, air leaks, inadequate steam penetration into the waste, and/or vacuum pump. The biological indicators revealed that about 55.55% of the samples were positive. The most of applied devices were not suitable for treating anatomical, pharmaceutical, cytotoxic, and chemical waste. Conclusion: Although on-site medical waste treating facilities have been installed in all the hospitals, the most of infectious-hazardous medical waste generated in the hospitals were deposited into a municipal solid waste landfill, without enough disinfection. The responsible authorities should stringently inspect and evaluate the operation of on-site medical waste treating equipment. An advanced off-site central facility with multi-treatment and disinfection equipment and enough capacity is recommended as an alternative.

  11. On-Site Enzyme Production by Trichoderma asperellum for the Degradation of Duckweed

    DEFF Research Database (Denmark)

    Bech, Lasse; Herbst, Florian-Alexander; Grell, Morten Nedergaard;

    2015-01-01

    The on-site production of cell wall degrading enzymes is an important strategy for the development of sustainable bio-refinery processes. This study concerns the optimization of production of plant cell wall-degrading enzymes produced by Trichoderma asperellum. A comparative secretome analysis...

  12. Operations manual: On Site Monitor (OSM), solar heating and cooling systems

    Science.gov (United States)

    1977-01-01

    The on-site monitor is a portable device which, when connected to a solar system site data acquisition subsystem; allows readouts of clock and sensor data in voltage or engineering units at instrumented solar heating and cooling sites. The unit is described and procedures for its proper operation are presented.

  13. Subsystem design package for the on-site monitor at solar heating and cooling sites

    Science.gov (United States)

    1977-01-01

    The on-site monitor is a portable device which can be easily connected to a Site Data Acquisition Subsystem to allow readouts of realtime sensor data in voltage or engineering units at instrumented solar heating and cooling sites. The design package consists of the performance specification, performance requirements cross reference, and the acceptance test procedure.

  14. Large-scale tomo-PIV for on-site drag analysis in speed sports

    NARCIS (Netherlands)

    Terra, W.; Sciacchitano, A.; Scarano, F.

    2015-01-01

    Large-scale tomographic Particle Image Velocimetry is proposed as a tool for the on-site aerodynamic investigation in speed sports. The ring-of-fire concept is presented, which relies upon a tomographic PIV system used during the training of athletes in speed sports. The system consists of a short t

  15. On-Site Renewable Energy and Green Buildings: A System-Level Analysis.

    Science.gov (United States)

    Al-Ghamdi, Sami G; Bilec, Melissa M

    2016-05-01

    Adopting a green building rating system (GBRSs) that strongly considers use of renewable energy can have important environmental consequences, particularly in developing countries. In this paper, we studied on-site renewable energy and GBRSs at the system level to explore potential benefits and challenges. While we have focused on GBRSs, the findings can offer additional insight for renewable incentives across sectors. An energy model was built for 25 sites to compute the potential solar and wind power production on-site and available within the building footprint and regional climate. A life-cycle approach and cost analysis were then completed to analyze the environmental and economic impacts. Environmental impacts of renewable energy varied dramatically between sites, in some cases, the environmental benefits were limited despite the significant economic burden of those renewable systems on-site and vice versa. Our recommendation for GBRSs, and broader policies and regulations, is to require buildings with higher environmental impacts to achieve higher levels of energy performance and on-site renewable energy utilization, instead of fixed percentages.

  16. Rapid on-site evaluation of axillary fine-needle aspiration cytology in breast cancer.

    LENUS (Irish Health Repository)

    O'Leary, D P

    2012-06-01

    Axillary ultrasonography (AUS) and fine-needle aspiration cytology (FNAC) can establish axillary lymph node status before surgery, although this technique is hampered by poor adequacy rates. To achieve consistently high rates of FNAC adequacy, rapid on-site evaluation (ROSE) of FNAC samples was introduced.

  17. 76 FR 5833 - Polaris Industries, Including On-Site Leased Workers From Westaff, Supply Technologies, Aerotek...

    Science.gov (United States)

    2011-02-02

    ... the Federal Register on September 15, 2010 (75 FR 56143). The notice was amended on December 6, 2010... Register on December 13, 2010 (75 FR 77666). At the request of the State agency, the Department reviewed... Employment and Training Administration Polaris Industries, Including On-Site Leased Workers From...

  18. 76 FR 22729 - Polaris Industries, Including On-Site Leased Workers From Westaff, Supply Technologies, Aerotek...

    Science.gov (United States)

    2011-04-22

    ... vehicles. The notice was published in the Federal ] Register on September 15, 2010 (75 FR 56143). The... December 13, 2010 (75 FR 77666) and February 2, 2011 (76 FR 5833), respectively. At the request of the... Employment and Training Administration Polaris Industries, Including On-Site Leased Workers From...

  19. On-site and off-site forensic analysis capabilities for proliferation and terrorism prevention

    International Nuclear Information System (INIS)

    Full text: We will present current on-site technologies that can be utilized for the screening of explosives, chemical agents, and environmental contaminants. These techniques must have the capability to detect various hazardous materials at very low levels, since they pose a major challenge for first responders. Specifically, the technology must detect concealed explosives or chemical agents on-site rapidly. Lawrence Livermore National Laboratory (LLNL) is currently developing several different high explosive screening and detection technologies for field use. Two technologies that have demonstrated an ability to screen for explosives at low levels are colorimetric spot tests and thin layer chromatography (TLC). Another technology that has demonstrated usefulness for the on-site analysis of unknowns is portable gas chromatography-mass spectrometry (GC-MS) with solid phase micro-extraction (SPME) sampling. Several examples utilizing these technologies and their usefulness will be presented. In addition to developing on-site screening methods, LLNL is an Organization for the Prohibition of Chemical Weapons (OPCW) designated laboratory and is certified to accept CW suspect samples. Currently, LLNL is expanding its ISO-17025 certification to include nuclear forensics and explosives. These off-site forensic analysis capabilities and certified procedures will support the needs for homeland security. We will highlight some of the ISO-17025 requirements to accredit procedures, handle samples, and reports. Work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under contract W-7405-ENG-48

  20. ON-SITE GC/MS ANALYSIS OF CHAPMAN GASIFICATION SEPARATOR LIQUOR

    Science.gov (United States)

    The report gives results of a characterization of a wastewater stream from a coal gasification plant, using on-site extraction and GC/MS analysis. Extractable material in the wastewater was primarily phenols and alkylphenols, accounting for about 99% of the total mass identified....

  1. 78 FR 54487 - Abbott Laboratories; Diagnostic-Hematology; Including On-Site Leased Workers From Manpower...

    Science.gov (United States)

    2013-09-04

    ... Workers From Manpower Service Group and ATR International; Santa Clara, California; Amended Certification..., Santa Clara, California. The Department's notice of determination was published in the Federal Register... from ATR International were employed on-site at the Santa Clara, California location of...

  2. 75 FR 41895 - Whirlpool Corporation, Evansville Division, Including On-Site Leased Workers From Andrews...

    Science.gov (United States)

    2010-07-19

    ... Workers From Andrews International, Inc., M.H. Equipment, and Kenco Logistics Services, LLC, Evansville..., Evansville Division, including on-site leased workers from Andrews International, Inc., Kenco Logistics... notice was published in the Federal Register on March 5, 2010 (75 FR 10321). The notice was amended...

  3. Decision precision or holistic heuristic?: Insights on on-site selection of student nurses and midwives.

    Science.gov (United States)

    Macduff, Colin; Stephen, Audrey; Taylor, Ruth

    2016-01-01

    Concerns about quality of care delivery in the UK have led to more scrutiny of criteria and methods for the selection of student nurses. However few substantive research studies of on-site selection processes exist. This study elicited and interpreted perspectives on interviewing processes and related decision making involved in on-site selection of student nurses and midwives. Individual and focus group interviews were undertaken with 36 lecturers, 5 clinical staff and 72 students from seven Scottish universities. Enquiry focused primarily on interviewing of candidates on-site. Qualitative content analysis was used as a primary strategy, followed by in-depth thematic analysis. Students had very mixed experiences of interview processes. Staff typically took into account a range of candidate attributes that they valued in order to achieve holistic assessments. These included: interpersonal skills, team working, confidence, problem-solving, aptitude for caring, motivations, and commitment. Staff had mixed views of the validity and reliability of interview processes. A holistic heuristic for overall decision making predominated over belief in the precision of, and evidence base for, particular attribute measurement processes. While the development of measurement tools for particular attributes continues apace, tension between holism and precision is likely to persist within on-site selection procedures.

  4. Rapid on-site detection of Acidovorax citrulli by cross-priming amplification.

    Science.gov (United States)

    Zhang, Jing; Tian, Qian; Zhu, Shui-fang; Zhao, Wen-jun; Liu, Feng-quan

    2012-08-01

    Cross-priming amplification (CPA) for Acidovorax citrulli detection was evaluated in this study. The sensitivity of CPA assay for pure bacterial culture was 3.7 × 10(3) CFU/ml. Bacteria on naturally infected watermelon seeds were detected using CPA assay, suggesting this method is suitable for A. citrulli on-site detection from watermelon seeds. PMID:22507851

  5. Decision precision or holistic heuristic?: Insights on on-site selection of student nurses and midwives.

    Science.gov (United States)

    Macduff, Colin; Stephen, Audrey; Taylor, Ruth

    2016-01-01

    Concerns about quality of care delivery in the UK have led to more scrutiny of criteria and methods for the selection of student nurses. However few substantive research studies of on-site selection processes exist. This study elicited and interpreted perspectives on interviewing processes and related decision making involved in on-site selection of student nurses and midwives. Individual and focus group interviews were undertaken with 36 lecturers, 5 clinical staff and 72 students from seven Scottish universities. Enquiry focused primarily on interviewing of candidates on-site. Qualitative content analysis was used as a primary strategy, followed by in-depth thematic analysis. Students had very mixed experiences of interview processes. Staff typically took into account a range of candidate attributes that they valued in order to achieve holistic assessments. These included: interpersonal skills, team working, confidence, problem-solving, aptitude for caring, motivations, and commitment. Staff had mixed views of the validity and reliability of interview processes. A holistic heuristic for overall decision making predominated over belief in the precision of, and evidence base for, particular attribute measurement processes. While the development of measurement tools for particular attributes continues apace, tension between holism and precision is likely to persist within on-site selection procedures. PMID:26213147

  6. The interactive on-site inspection system: An information management system to support arms control inspections

    Energy Technology Data Exchange (ETDEWEB)

    DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

    1996-12-01

    The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

  7. 2009 Melbourne metropolitan sewerage strategy: a portfolio of decentralised and on-site concept designs.

    Science.gov (United States)

    Brown, V; Jackson, D W; Khalifé, M

    2010-01-01

    The bulk and retail water companies of the greater Melbourne area are developing the 2009 Metropolitan Sewerage Strategy to provide sustainable sewerage services to 2060. The objective of the strategy is to establish long term principles and near term actions to produce a robust sewage management system for Melbourne. Melbourne's existing sewerage system is largely centralised and discharges to two major treatment plants. Several small satellite treatment plants service local urban areas generally more distant from the centralised system. Decentralised and on-site wastewater systems are options for future sewage management and could play a role in local recycling. A portfolio of 18 on-site and decentralised concept designs was developed, applicable to the full range of urban development types in Melbourne. The concepts can be used in evaluation of metropolitan system configurations as part of future integrated water cycle planning. The options included secondary and tertiary treatment systems incorporating re-use of water for non potable uses, urine separation, black and greywater separation and composting toilets. On-site and cluster treatment systems were analysed. Each option is described by its indicative capital and operating costs, energy use and water and nutrient balances. This paper summarises and compares the portfolio mix of decentralized and on-site options in Melbourne's context. PMID:20705997

  8. 76 FR 81986 - Honeywell International, Inc., Automation and Control Solutions Division, Including On-Site...

    Science.gov (United States)

    2011-12-29

    ..., 2010 (75 FR 49531). The notice was amended on December 7, 2010 to include several on-site leased worker firms. The amended notice was published in the Federal Register on December 13, 2010 (75 FR 77664-77665... Employment and Training Administration Honeywell International, Inc., Automation and Control...

  9. On-site and off-site forensic analysis capabilities for proliferation and terrorism prevention

    International Nuclear Information System (INIS)

    We present current on-site technologies that can be utilized for the screening of explosives, chemical agents, and environmental contaminants. These techniques must have the capability to detect various hazardous materials at very low levels, since they pose a major challenge for first responders. Specifically, the technology must detect concealed explosives or chemical agents on-site rapidly. Lawrence Livermore National Laboratory (LLNL) is currently developing several different high explosive screening and detection technologies for field use. Two technologies that have demonstrated an ability to screen for explosives at low levels are colorimetric spot tests and thin layer chromatography (TLC). Another technology that has demonstrated usefulness for the on-site analysis of unknowns is portable gas chromatography-mass spectrometry (GC-MS) with solid phase micro-extraction (SPME) sampling. Several examples utilizing these technologies and their usefulness will be presented. In addition to developing on-site screening methods, LLNL is an Organization for the Prohibition of Chemical Weapons (OPCW) designated laboratory and is certified to accept CW suspect samples. Currently, LLNL is expanding its ISO-17025 certification to include nuclear forensics and explosives. These off-site forensic analysis capabilities and certified procedures will support the needs for homeland security. We will highlight some of the ISO-17025 requirements to accredit procedures, handle samples, and reports. Work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under contract W-7405-ENG-48. (author)

  10. 40 CFR 86.1860-04 - How to comply with the Tier 2 and interim non-Tier 2 fleet average NOX standards.

    Science.gov (United States)

    2010-07-01

    ... interim non-Tier 2 fleet average NOX standards. 86.1860-04 Section 86.1860-04 Protection of Environment... § 86.1860-04 How to comply with the Tier 2 and interim non-Tier 2 fleet average NOX standards. (a) The fleet average standards referred to in this section are the corporate fleet average standards for...

  11. Early interim FDG PET/CT prediction of treatment response and prognosis in pediatric Hodgkin disease - added value of low-dose CT

    Energy Technology Data Exchange (ETDEWEB)

    Ilivitzki, Anat [Rambam Health Care Campus, Department of Diagnostic Imaging, Haifa (Israel); Rambam Health Care Campus, Department of Pediatric Radiology, Haifa (Israel); Radan, Lea; Israel, Ora [Rambam Health Care Campus, Department of Nuclear Medicine, Haifa (Israel); Ben-Arush, Miriam; Ben-Barak, Ayelet [Rambam Health Care Campus, Department of Pediatric Oncology, Haifa (Israel)

    2013-01-15

    Interim 18F-FDG PET helps predict outcome and tailor treatment in adults with Hodgkin disease (HD). The purpose of this study was to assess predictive values of interim 18F-FDG PET/CT in children with HD and to define the potential added value to interim PET of low-dose CT. Children were prospectively enrolled August 2002-April 2007. PET/low-dose CT was performed at staging, after 2 cycles, at the end of treatment and during follow-up (mean 45 months). Treatment was unchanged regardless of interim results. PET and low-dose CT were read independently. Of 34 enrolled children (ages 3-17 years), 27 achieved complete response, 4 had progressive disease and 3 had relapse. Interim PET alone had positive and negative predictive values of 67% and 89%, respectively. Interim low-dose CT alone had positive and negative predictive values of 35% and 100%, respectively. Interim PET/CT had positive and negative predictive values of 75% and 96%, respectively. Early interim PET/CT was a good predictor of outcome. Integrated PET and low-dose CT improved the predictive value in children with HD. (orig.)

  12. Interim storage of solidified fission products from fuel element reprocessing with utilization of obtaining post-decay heat

    International Nuclear Information System (INIS)

    It is noted that the out-lined interim store for HRW with industrial utilization of decay heat (production of saturated steam and hydrogen) does include a certain risk potential like any technical plant but that it does not represent a danger to the population living nearby. All internal and external impacts on the store result in safely triggering natural convection cooling. A further emergency cooling system is provided by the water irrigation facility so that obtaining after-heat can be safely removed under all circumstances. Therefore, there are no safety-technology arguments against any realization of the concept presented for interim storage of solidified high-level radio-active wastes. An interim store of this type may be built and operated even in densely populated regions and urban agglomerations. (orig./HP)

  13. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    Energy Technology Data Exchange (ETDEWEB)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.

  14. IFMIF (International Fusion Materials Irradiation Facility) key element technology phase interim report

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, Hiroo; Ida, Mizuho; Sugimoto, Masayoshi; Takeuchi, Hiroshi; Yutani, Toshiaki (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-03-01

    Activities of International Fusion Materials Irradiation Facility (IFMIF) have been performed under an IEA collaboration since 1995. IFMIF is an accelerator-based deuteron (D{sup +})-lithium (Li) neutron source designed to produce an intense neutron field (2 MW/m{sup 2}, 20 dpa/year for Fe) in a volume of 500 cm{sup 3} for testing candidate fusion materials. In 2000, a 3 year Key Element technology Phase (KEP) of IFMIF was started to reduce the key technology risk factors. This interim report summarizes the KEP activities until mid 2001 in the major project work-breakdown areas of accelerator, target, test facilities and design integration. (author)

  15. Nondestructive evaluation of creep-fatigue damage: an interim report. [LMFBR

    Energy Technology Data Exchange (ETDEWEB)

    Nickell, R.E.

    1977-02-01

    In view of the uncertainties involved in designing against creep-fatigue failure and the consequences of such failures in Class 1 nuclear components that operate at elevated temperature, the possibility of intermittent or even continuous non-destructive examination of these components has been considered. In this interim report some preliminary results on magnetic force and ultrasonic evaluation of creep-fatigue damage in an LMFBR steam generator material are presented. These results indicate that the non-destructive evaluation of pure creep damage will be extremely difficult. A set of biaxial creep-fatigue tests that are designed to discriminate between various failure theories is also described.

  16. Meet the Challenges of Spent Fuel Interim Storage by Using Intensive Innovation

    International Nuclear Information System (INIS)

    AREVA Logistics Business Unit, through its entities TN International in France, Transnuclear Inc. in the USA and Transnuclear Ltd. in Japan, has proposed for more than 2 decades the leading dry storage systems of spent fuel in use today. These systems have mainly been sold in Europe, in the US and in Japan. The PWR, BWR or VVER fuel characteristics may have various enrichment values up to 5%, various cooling time down to 2 years and various burnups up to 65,000 MWd/tU. Facing the current international trend towards expanding Spent Fuel Interim Storage capabilities and the unpredictable market prices of steel large forged components, AREVA Logistics Business Unit has launched an extensive innovation process to create the new generation of dry interim storage systems: i) the TN®DUO cask is an innovative and cost effective dual purpose cask; and ii) the TN®NOVA system is an innovative canister system based on the NUHOMS® cask system, the US industry leading spent fuel storage solution. These two innovative solutions can naturally be transported to the storage facilities as well as other sites such as reprocessing facilities or geological repositories depending of the national strategy for the back-end of the nuclear fuel cycle. In addition to these innovative dry interim storage systems and based on 40 years experience in design, licensing and fabrication of baskets for transportation cask, AREVA Logistics Business Unit has developed new innovative designs for Underwater Fuel Storage Racks which includes the use of Metal Matrix Composite (MMC) material as a neutron absorbing material. This kind of material allows proposing a cost efficient solution with a reduced rack weight and a significant improvement of the criticality performance. Furthermore, AREVA Logistics Business Unit Rack Design remains flexible and evolutionary linked to fuel characteristics evolution and it can include other neutron absorbing materials commonly used in the nuclear industry as borated

  17. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  18. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    Science.gov (United States)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  19. Safety research activities for Japanese regulations of spent fuel interim storage facilities

    International Nuclear Information System (INIS)

    Japan Nuclear Energy Safety Organization (JNES) carries out (a) preparation of technical documents, (b) technical evaluations of standards (prepared by academic societies), etc. and (c) other R and D activities, to support Nuclear Regulation Authority (NRA: which controls the regulations for Spent Fuel Interim Storage Facilities). In 2012 fiscal year, JNES carried out dynamic test of spent fuel to examine the integrity of spent fuel under cask drop accidents, and preparation for PWR spent fuel storage test to prove long term integrity of spent fuel and cask itself. Some of these tests will be also carried out in 2013 fiscal year and after. (author)

  20. Emulytics for Cyber-Enabled Physical Attack Scenarios: Interim LDRD Report of Year One Results.

    Energy Technology Data Exchange (ETDEWEB)

    Clem, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Urias, Vincent [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Atkins, William Dee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Symonds, Christopher J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-08

    Sandia National Laboratories has funded the research and development of a new capability to interactively explore the effects of cyber exploits on the performance of physical protection systems. This informal, interim report of progress summarizes the project’s basis and year one (of two) accomplishments. It includes descriptions of confirmed cyber exploits against a representative testbed protection system and details the development of an emulytics capability to support live, virtual, and constructive experiments. This work will support stakeholders to better engineer, operate, and maintain reliable protection systems.

  1. IFMIF (International Fusion Materials Irradiation Facility) key element technology phase interim report

    International Nuclear Information System (INIS)

    Activities of International Fusion Materials Irradiation Facility (IFMIF) have been performed under an IEA collaboration since 1995. IFMIF is an accelerator-based deuteron (D+)-lithium (Li) neutron source designed to produce an intense neutron field (2 MW/m2, 20 dpa/year for Fe) in a volume of 500 cm3 for testing candidate fusion materials. In 2000, a 3 year Key Element technology Phase (KEP) of IFMIF was started to reduce the key technology risk factors. This interim report summarizes the KEP activities until mid 2001 in the major project work-breakdown areas of accelerator, target, test facilities and design integration. (author)

  2. Interim obturator in an infant with Treacher Collins syndrome: Review and chairside modification in impression making

    Directory of Open Access Journals (Sweden)

    Sudhir Bhandari

    2011-01-01

    Full Text Available Treacher Collins syndrome has been described as a syndrome involving 1st and 2nd branchial arches, affecting various organs in the craniofacial region. Affected infants report with nasal regurgitation and minimal dietary intake due to cleft palate, consequently show delayed and retarded growth. The situation is further complicated when the repair of the palatal defect is postponed due to delayed milestones. At this juncture, it is of paramount importance to intervene prosthetically and close the defect with the aid of an interim obturator. Herein we describe a simple, yet successful, chairside approach to make an impression of an infant without the aid of any kind of anesthesia.

  3. Interim obturator in an infant with Treacher Collins syndrome: Review and chairside modification in impression making.

    Science.gov (United States)

    Bhandari, Sudhir; Aras, Meena; Bakshi, Sonika

    2011-10-01

    Treacher Collins syndrome has been described as a syndrome involving 1st and 2nd branchial arches, affecting various organs in the craniofacial region. Affected infants report with nasal regurgitation and minimal dietary intake due to cleft palate, consequently show delayed and retarded growth. The situation is further complicated when the repair of the palatal defect is postponed due to delayed milestones. At this juncture, it is of paramount importance to intervene prosthetically and close the defect with the aid of an interim obturator. Herein we describe a simple, yet successful, chairside approach to make an impression of an infant without the aid of any kind of anesthesia.

  4. 2. interim report on radiation situation in Finland from 5 to 16 May 1986

    International Nuclear Information System (INIS)

    This second interim report is a continuation of the first 'Fallout situation in Finland from April 26 to May 4' STUK-B-VALO-44. It deals with the results from external radiation measurements and analysis of environmental and foodstuff samples between 5 and 16 May, i.e. the development of the situation after the fallout peak. The whole-body counter measurements of tourists returning from the Soviet Union and from other countries in Eastern Europe after the accident are also reported

  5. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  6. Interim structural evaluation of pool swell loads on suppression chamber of Peach Bottom Plant

    International Nuclear Information System (INIS)

    An interim structural evaluation has been conducted to establish the effects of pool swell loads on the suppression chamber system of a typical Mark I plant. The plant selected for the analyses was the Peach Bottom Atomic Power Station, Unit 3. In order to provide results in a timely manner, the geometry was adopted from an existing finite element model of a suppression chamber such that the model closely represented, though not identically, the Peach Bottom Plant. A brief summary of the results obtained from the various analyses is presented for the three main structural components of the suppression chamber, i.e., the support columns, the reinforcing ring, and the cylindrical shell

  7. Interim structural evaluation of pool swell loads on suppression chamber of Peach Bottom Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kontoudakis, J.; Higginbotham, A.B.

    1976-04-01

    An interim structural evaluation has been conducted to establish the effects of pool swell loads on the suppression chamber system of a typical Mark I plant. The plant selected for the analyses was the Peach Bottom Atomic Power Station, Unit 3. In order to provide results in a timely manner, the geometry was adopted from an existing finite element model of a suppression chamber such that the model closely represented, though not identically, the Peach Bottom Plant. A brief summary of the results obtained from the various analyses is presented for the three main structural components of the suppression chamber, i.e., the support columns, the reinforcing ring, and the cylindrical shell.

  8. Liivimaa ja Augsburgi Interim 1548. Lisandusi teadmistele reformatsiooni levikust Baltikumi / Juhan Kreem

    Index Scriptorium Estoniae

    Kreem, Juhan, 1971-

    2011-01-01

    Interim (15. mail Augsburgi riigipäevale kogunenutele esitatud usuküsimuste ajutine lahendus) oli viimane tõsine katse ületada usulõhe. Võib arvata, et Interimi tekst sai Liivimaal laiemalt teatavaks 1548. aasta novembri esimesel poolel. Saksa Ordu reageering sellele sisaldub 1548. aasta sügisel koostatud ordukapiitlil arutatavate küsimuste nimekirjas. Tegemist on Interimi luterliku eitamisega. Tallinlaste meelest polnud keiser üldse volitatud usuasjade üle otsustama. Tallinlaste soovitatav käitumine oli vaikiv vastupanu. Interimi-vastast suhtumist ei saa siiski pidada Liivimaa üksmeelseks väljenduseks

  9. Evaluation of Equivalent Dose Rate of Interim Dry Storage Casks Loaded with Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    Equivalent dose rate calculations of the CASTOR RBMK-1500 and CONSTOR RBMK-1500 casks were performed using SCALE 4.3 computer codes system. These casks are planned for an interim storage of spent nuclear fuel at Ignalina NPP. The dose rate calculations were made on the sidelong, upper and lower surface of the cask and at the certain distance. Results show that dose rate values on the surface of the cask are much less then permissible value 1000 μSv/h when average burnup of fuel assembly is 20 GWd/tU. (author)

  10. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  11. Department of Energy Plutonium ES ampersand H Vulnerability Assessment Savannah River Site interim compensatory measures

    International Nuclear Information System (INIS)

    The Savannah River Site (SRS) has recently completed a self-assessment of potential vulnerabilities associated with plutonium and other transuranic materials stored at the site. An independent Working Group Assessment Team (WGAT) appointed by DOE/ES ampersand H also performed an independent assessment, and reviewed and validated the site self-assessment. The purpose of this report is to provide a status of interim compensatory measures at SRS to address hazards in advance of any corrective actions. ES ampersand H has requested this status for all vulnerabilities ranked medium or higher with respect to potential consequences to workers, environment, and the public

  12. Conceptual design of the JT-60 neutral beam injection system (interim report)

    International Nuclear Information System (INIS)

    This is an interim report on conceptual design of the JT-60 neutral beam injection system. Requirements for the JT-60 neutral beam injector are injection of a 20 MW neutral hydrogen beam into the plasma in the vicinity of energy 75 keV as long as 10 sec, keeping thermal gas flow rate into the torus vacuum chamber below 15% the neutral beam flux. On the basis of these requirements and recent results of research and development of ion sources and beam line components, system conceptual design is now proceeding. Scale of the JT-60 neutral beam injection system is discussed, indicating also future problems. (auth.)

  13. Unit cell modeling in support of interim performance assessment for low level tank waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kline, N.W., Westinghouse Hanford

    1996-08-01

    A unit cell model is used to simulate the base analysis case and related sensitivity cases for the interim performance assessment of low level tank waste disposal. Simulation case results are summarized in terms of fractional contaminant release rates to the vadose zone and to the water table at the unconfined aquifer. Results suggest that the crushed glass water conditioning layer at the top of the facility and the chemical retardation pad at the bottom of the facility can be important components of the facility. Results also suggest that the release rates to the water table are dominated by the release rate from the waste form.

  14. Republic of Congo; Joint Staff Advisory Note of the Interim Poverty Reduction Strategy Paper

    OpenAIRE

    International Monetary Fund

    2005-01-01

    This Joint Staff Advisory Note examines Congo’s Interim Poverty Reduction Strategy Paper (I-PRSP). The I-PRSP recognizes the lack of recent and good quality data on poverty, and recommends new surveys and studies to improve poverty assessment and analysis. On the basis of the sparsely available data, the I-PRSP estimates that at least 50 percent of the population is poor. The I-PRSP also links the high poverty incidence to a significant decline in per capita output and the deterioration of ...

  15. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  16. Hydrogen combustion in an MCO during interim storage (fauske and associates report 99-14)

    Energy Technology Data Exchange (ETDEWEB)

    PLYS, M.G.

    1999-05-12

    Flammable conditions are not expected to develop in an MCO during interim storage. This report considers potential phenomena which, although not expected t o occur, could lead t o flammable conditions. For example, reactions of hydrogen w i t h fuel over decades a r e postulated t o lead t o flammable atmospheric mixtures. For the extreme cases considered in this report, the highest attainable post-combustion pressure is about 13 atmospheres absolute, almost a factor of two and a half below the MCO design pressure of 31 atmospheres.

  17. Interim results from the characterization testing of the Engineering Development (EDM) rubidium clocks for satellite applications

    Science.gov (United States)

    Powers, Edward D., Jr.; Danzy, Fredrick

    1990-01-01

    Some interim results from the environmental testing program to evaluate the Engineering Design Model (EDM) of the EG and G Spaceborne Rubidium Clock are presented. This effort is in support of the Global Positioning System (GPS) BLOCK IIR program and is intended to characterize the performance of EG and G design for BLOCK IIR satellite applications. Two EG and G EDM units are currently under test at NRL's Clock Test Facility to measure the long-term frequency stability, drift, and frequency versus temperature characteristics.

  18. Limitations of on-site dairy farm regulatory debits as milk quality predictors.

    Science.gov (United States)

    Borneman, Darand L; Stiegert, Kyle; Ingham, Steve

    2015-03-01

    In the United States, compliance with grade A raw fluid milk regulatory standards is assessed via laboratory milk quality testing and by on-site inspection of producers (farms). This study evaluated the correlation between on-site survey debits being marked and somatic cell count (SCC) or standard plate count (SPC) laboratory results for 1,301 Wisconsin grade A dairy farms in 2012. Debits recorded on the survey form were tested as predictors of laboratory results utilizing ordinary least squares regression to determine if results of the current method for on-site evaluation of grade A dairy farms accurately predict SCC and SPC test results. Such a correlation may indicate that current methods of on-site inspection serve the primary intended purpose of assuring availability of high-quality milk. A model for predicting SCC was estimated using ordinary least squares regression methods. Step-wise selected regressors of grouped debit items were able to predict SCC levels with some degree of accuracy (adjusted R2=0.1432). Specific debit items, seasonality, and farm size were the best predictors of SCC levels. The SPC data presented an analytical challenge because over 75% of the SPC observations were at or below a 25,000 cfu/mL threshold but were recorded by testing laboratories as at the threshold value. This classic censoring problem necessitated the use of a Tobit regression approach. Even with this approach, prediction of SPC values based on on-site survey criteria was much less successful (adjusted R2=0.034) and provided little support for the on-site survey system as a way to inform farmers about making improvements that would improve SPC. The lower level of correlation with SPC may indicate that factors affecting SPC are more varied and differ from those affecting SCC. Further, unobserved deficiencies in postmilking handling and storage sanitation could enhance bacterial growth and increase SPC, whereas postmilking sanitation will have no effect on SCC because

  19. Progress and future direction for the interim safe storage and disposal of Hanford high level waste (HLW)

    International Nuclear Information System (INIS)

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the US DOE and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described

  20. Wayne Interim Storage Site environmental report for calendar year 1989, Wayne, New Jersey

    International Nuclear Information System (INIS)

    The environmental monitoring program, begun in 1984, was continued in 1989 at the Wayne Interim Storage Site (WISS), a US Department of Energy (DOE) facility located in Wayne Township, New Jersey. The WISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive material remains from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The monitoring program at WISS measures radon and thoron concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the findings of the environmental monitoring program conducted at the Wayne Interim Storage Site (WISS) during calendar year 1989. 26 refs., 12 figs., 16 tabs

  1. Cna 1 spent fuel element interim dry storage system thermal analysis

    International Nuclear Information System (INIS)

    At the moment, the Atucha I Nuclear Power Plant (Cnea-I) located in the city of Lima, has enough room to store its spent fuel (Sf) in their two pools spent fuel until about 2015.In case of life extension a spend fuel element interim dry storage system is needed.Nucleolectrica Argentina S.A. (N A-S A) and the Comision Nacional de Energia Atomica (Cnea), have proposed different interim dry storage systems.These systems have to be evaluated in order to choose one of them.The present work's objective is the thermal analysis of one dry storage alternative for the Sf element of Cna 1.In this work a simple model was developed and used to perform the thermal calculations corresponding to the system proposed by Cnea.This system considers the store of sealed containers with 37 spent fuels in concrete modules.Each one of the containers is filled in the pool houses and transported to the module in a transference cask with lead walls.Fulfill the maximum cladding temperature requirement (<200 degrade C) for a total 2140 W thermal power

  2. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  3. INTERIM STORAGE AND LONG TERM DISPOSAL OF RESEARCH REACTOR SPENT FUEL

    Energy Technology Data Exchange (ETDEWEB)

    Vinson, D

    2006-08-22

    Aluminum clad research reactor spent nuclear fuel (SNF) is currently being consolidated in wet storage basins (pools). Approximately 20 metric tons (heavy metal) of aluminum-based spent nuclear fuel (Al-SNF) is being consolidated for treatment, packaging, interim storage, and preparation for ultimate disposal in a geologic repository. The storage and disposal of Al-SNF are subject to requirements that provide for safety and acceptable radionuclide release. The options studied for interim storage of SNF include wet storage and dry storage. Two options have also been studied to develop the technical basis for the qualification and repository disposal of aluminum spent fuel. The two options studied include Direct Disposal and Melt-Dilute treatment. The implementation of these options present relative benefits and challenges. Both the Direct Disposal and the Melt-Dilute treatment options have been developed and their technical viability assessed. Adaptation of the melt-dilute technology for the treatment of spent fuel offers the benefits of converting the spent fuel into a proliferation resistant form and/or significantly reducing the volume of the spent fuel. A Mobile Melt-Dilute system concept has emerged to realize these benefits and a prototype system developed. The application of the melt-dilute technology for the treatment of legacy nuclear materials has been evaluated and also offers the promise for the safe disposal of these materials.

  4. CERCLA interim action at the Par Pond unit: A case study

    International Nuclear Information System (INIS)

    The Par Pond unit designated under CERCLA consists of sediments within a Savannah River Site (SRS) cooling water reservoir. The sediments are contaminated with radionuclides and nonradioactive constituents from nuclear production reactor operations. The mercury in Par Pond is believed to have originated from the Savannah River. Because of Par Pond Dam safety Issues, the water level of the reservoir was drawn down, exposing more than 1300 acres of contaminated sediments and triggering the need for CERCLA interim remedial action. This paper presents the interim action approach taken with Par Pond as a case study. The approach considered the complexity of the Par Pond ecosystem, the large size of Par Pond, the volume of contaminated sediments, and the institutional controls existing at SRS. The Environmental Protection Agency (EPA) considers units with large volumes of low-concentration wastes, as is the case with Par Pond, to be open-quotes special sites.close quotes Accordingly, EPA guidance establishes that the range of alternatives developed focus primarily on containment options and other remedial approaches that mitigate potential risks associated with the open-quotes special site.close quotes The remedial alternatives, according to EPA, are not to be prohibitively expensive or difficult to implement. This case study also is representative of the types of issues that will need to be addressed within the Department of Energy (DOE) complex as nuclear facilities are transitioned to inactive status and corrective/remedial actions are warranted

  5. INTERIM BARRIER AT HANFORDS TY FARM TO PROTECT GROUNDWATER AT THE HANFORD SITE WASHINGTON USA

    Energy Technology Data Exchange (ETDEWEB)

    PARKER DL; HOLM MJ; HENDERSON JC; LOBER RW

    2011-01-13

    An innovative interim surface barrier was constructed as a demonstration project at the Hanford Site's TY Tank Farm. The purpose of the demonstration barrier is to stop rainwater and snowmelt from entering the soils within the tank farm and driving contamination from past leaks and spills toward the ground water. The interim barrier was constructed using a modified asphalt material with very low permeability developed by MatCon{reg_sign}. Approximately 2,400 cubic yards of fill material were added to the tank farm to create a sloped surface that will gravity drain precipitation to collection points where it will be routed through buried drain lines to an evapotranspiration basin adjacent to the farm. The evapotranspiration basin is a lined basin with a network of perforated drain lines covered with soil and planted with native grasses. The evapotranspiration concept was selected because it prevents the runoff from percolating into the soil column and also avoids potential monitoring and maintenance issues associated with standing water in a traditional evaporation pond. Because of issues associated with using standard excavation and earth moving equipment in the farm a number of alternate construction approaches were utilized to perform excavations and prepare the site for the modified asphalt.

  6. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-04-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  7. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    International Nuclear Information System (INIS)

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs

  8. Czech interim spent fuel storage facility: operation experience, inspections and future plans

    International Nuclear Information System (INIS)

    The paper describes the situation in the spent fuel management in the Czech Republic. The interim Spent Fuel Storage Facility (ISFSF) at Dukovany, which was commissioned in January 1997 and is using dual transport and storage CASTOR - 440/84 casks, is briefly described. The authors deal with their experience in operating and inspecting the ISFSF Dukovany. The structure of the basic safety document 'Limits and Conditions of Normal Operation' is also mentioned, including the experience of the performance. The inspection activities focused on permanent checking of the leak tightness of the CASTOR 440/84 casks, the maximum cask temperature and inspections monitoring both the neutron and gamma dose rate as well as the surface contamination. The results of the inspections are mentioned in the presentation as well. The operator's experience with re-opening partly loaded and already dried CASTOR-440/84 cask, after its transport from NPP Jaslovske Bohunice to the NPP Dukovany is also described. The paper introduces briefly the concept of future spent fuel storage both from the NPP Dukovany and the NPP Temelin, as prepared by the CEZ. The preparatory work for the Central Interim Spent Nuclear Fuel Storage Facility (CISFSF) in the Czech Republic and the information concerning the planned storage technology for this facility is discussed in the paper as well. The authors describe the site selection process and the preparatory steps concerning new spent fuel facility construction including the Environmental Impact Assessment studies. (author)

  9. Modified Interim Mandibular Advancement (MIMA) Appliance for Symptomatic Correction of Obstructive Sleep Apnea.

    Science.gov (United States)

    Maurya, Rajkumar; Singh, Harpreet; Mishra, Harsh Ashok; Gupta, Ankur

    2016-08-01

    Obstructive Sleep Apnea (OSA) is a chronic, progressive, multifactorial, life-threatening disorder that causes significant impact on patient's life. Patients with OSA [Apnea/Hypopnea Index (AHI)>30] who cannot tolerate Continuous Positive Airway Pressure (CPAP) therapy or are not surgical candidates may benefit from oral appliances. This paper describes interim appliance devised from existing Hawley's retainer in patients with OSA. A 38-year-old man of athletic built with history of orthodontic treatment six months back due to esthetic concerns and wearing upper Hawley's retainer, reported with chief complaint of frequent nocturnal awakening along with excessive daytime somnolence. Based on diagnostic aids, he was diagnosed with Class II Division 1 malocclusion with severe mandibular retrusion. Sleep test revealed AHI score of 34, suggestive of severe OSA. With ENT and Oral surgeon concurrence, mandibular advancement of 7mm with Bilateral Sagital Split Osteotomy (BSSO) with distraction was contemplated as a viable functional and curative stable treatment plan. Because of non-adherence and non-compliance with CPAP therapy and on request of patient, an interim anterior positioning appliance was devised to facilitate comfortable sound sleep till the time surgery is impending. After three months of wearing this customized appliance, improved quality of sleep was discernible; both subjectively as reported by patient and objectively using sleep test (AHI=9.8). PMID:27656589

  10. Does the radiation from the interim storage in Gorleben affect the sex ratio of newborn children?

    International Nuclear Information System (INIS)

    In the professional world but especially in public, the question is discussed whether ionizing radiation from nuclear facilities has a significant impact on the secondary sex ratio of newborn children in the vicinity of the plants. This issue is of exceptional importance in the region around Gorleben, where the opposition to nuclear facilities and activities for decades is particularly strong. At the site borders of the interim storage facility (TBL-G) of GNS the effective individual dose is about 0.2 mSv per year, mainly caused by neutron irradiation from 108 casks with high-level radioactive waste from reprocessing. In the surrounding villages there is no radiation measurable. Statistical studies allegedly have shown evidence that in some villages in the area and during certain periods, proportionately fewer girls were born in comparison to the average for the Federal Republic of Germany. Based on these purely statistical results henceforward was also alleged that neutron-induced secondary effects such as activation or secondary gamma radiation would be responsible for it. Monte Carlo calculations and special measurements yielded values of the dose at the plant border for activation products less than E-04 mSv/a and for secondary gamma radiation of about E-03 mSv/a. These results indicate that the ionizing radiation from the Gorleben interim storage facility cannot be held accountable for shifts of the secondary sex ratio.

  11. Physical protection of a nuclear waste interim storage against interference by third parties

    International Nuclear Information System (INIS)

    Full text: The nuclear power plant (NPP) Lubmin/Greifswald was shut down in 1990. As there exists no final storage for radioactive waste in Germany it is necessary to store the spent nuclear fuel elements and the radioactive waste of the decommissioning on the NPP site. Therefore the Interim Storage North (ISN) was erected. The spent fuel elements are dry stored in massive iron casks from type CASTOR-440/84. The physical protection of the ISN is determined by the storage of spent nuclear fuel. It must realize the prevention of danger to life and health due to release of a substantial amount of radioactive material and of stealing nuclear fuels in such amounts that critical accumulations can be produced. The concept of physical protection against interference by third parties consists of three barriers. The first is the CASTOR cask itself, the second is the storage building and the third the fence around the storage site. In the paper the systems of physical protection of the Interim Storage North are presented. (author)

  12. COMPLETION OF THE FIRST INTEGRATED SPENT NUCLEAR FUEL TRANSSHIPMENT/INTERIM STORAGE FACILITY IN NW RUSSIA

    International Nuclear Information System (INIS)

    Northwest and Far East Russia contain large quantities of unsecured spent nuclear fuel (SNF) from decommissioned submarines that potentially threaten the fragile environments of the surrounding Arctic and North Pacific regions. The majority of the SNF from the Russian Navy, including that from decommissioned nuclear submarines, is currently stored in on-shore and floating storage facilities. Some of the SNF is damaged and stored in an unstable condition. Existing Russian transport infrastructure and reprocessing facilities cannot meet the requirements for moving and reprocessing this amount of fuel. Additional interim storage capacity is required. Most of the existing storage facilities being used in Northwest Russia do not meet health and safety, and physical security requirements. The United States and Norway are currently providing assistance to the Russian Federation (RF) in developing systems for managing these wastes. If these wastes are not properly managed, they could release significant concentrations of radioactivity to these sensitive environments and could become serious global environmental and physical security issues. There are currently three closely-linked trilateral cooperative projects: development of a prototype dual-purpose transport and storage cask for SNF, a cask transshipment interim storage facility, and a fuel drying and cask de-watering system. The prototype cask has been fabricated, successfully tested, and certified. Serial production is now underway in Russia. In addition, the U.S. and Russia are working together to improve the management strategy for nuclear submarine reactor compartments after SNF removal

  13. Maywood Interim Storage Site: Annual environmental report for calendar year 1990, Maywood, New Jersey

    International Nuclear Information System (INIS)

    Environmental monitoring of the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) and surrounding area began in 1984. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The MISS Environmental monitoring programs was established to accommodate facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, extent and use of affected land and water, and local public interest or concern. The environmental monitoring program at MISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium, radium-226, and thorium-232 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs, and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program show that concentrations of the contaminants of concern were all below applicable standards. Because the site is used only for interim storage and produces no processing effluents, all monitoring, except for radon and direct gamma radiation, was done on a quarterly basis. 18 refs., 17 figs., 28 tabs

  14. Methods for assessing environmental impacts of a FUSRAP property-cleanup/interim-storage remedial action

    International Nuclear Information System (INIS)

    This document provides a description of a property-cleanup/interim-storage action, explanation of how environmental impacts might occur, comprehensive treatment of most potential impacts that might occur as a result of this type of action, discussion of existing methodologies for estimating and assessing impacts, justification of the choice of specific methodologies for use in FUSRAP environmental reviews, assessments of representative impacts (or expected ranges of impacts where possible), suggested mitigation measures, and some key sources of information. The major topical areas covered are physical and biological impacts, radiological impacts, and socioeconomic impacts. Some project-related issues were beyond the scope of this document, including dollar costs, specific accident scenarios, project funding and changes in Congressional mandates, and project management (contracts, labor relations, quality assurance, liability, emergency preparedness, etc.). These issues will be covered in other documents supporting the decision-making process. Although the scope of this document covers property-cleanup and interim-storage actions, it is applicable to other similar remedial actions. For example, the analyses discussed herein for cleanup activities are applicable to any FUSRAP action that includes site cleanup

  15. Energy policy act transportation study: Interim report on natural gas flows and rates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-17

    This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of natural gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.

  16. Identifying Potential Areas for Siting Interim Nuclear Waste Facilities Using Map Algebra and Optimization Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Omitaomu, Olufemi A [ORNL; Liu, Cheng [ORNL; Cetiner, Sacit M [ORNL; Belles, Randy [ORNL; Mays, Gary T [ORNL; Tuttle, Mark A [ORNL

    2013-01-01

    The renewed interest in siting new nuclear power plants in the United States has brought to the center stage, the need to site interim facilities for long-term management of spent nuclear fuel (SNF). In this paper, a two-stage approach for identifying potential areas for siting interim SNF facilities is presented. In the first stage, the land area is discretized into grids of uniform size (e.g., 100m x 100m grids). For the continental United States, this process resulted in a data matrix of about 700 million cells. Each cell of the matrix is then characterized as a binary decision variable to indicate whether an exclusion criterion is satisfied or not. A binary data matrix is created for each of the 25 siting criteria considered in this study. Using map algebra approach, cells that satisfy all criteria are clustered and regarded as potential siting areas. In the second stage, an optimization problem is formulated as a p-median problem on a rail network such that the sum of the shortest distance between nuclear power plants with SNF and the potential storage sites from the first stage is minimized. The implications of obtained results for energy policies are presented and discussed.

  17. Field sampling and selecting on-site analytical methods for explosives in soil

    Energy Technology Data Exchange (ETDEWEB)

    Crockett, A.B.; Craig, H.D.; Jenkins, T.F.; Sisk, W.E.

    1996-12-01

    A large number of defense-related sites are contaminated with elevated levels of secondary explosives. Levels of contamination range from barely detectable to levels above 10% that need special handling because of the detonation potential. Characterization of explosives-contaminated sites is particularly difficult because of the very heterogeneous distribution of contamination in the environment and within samples. To improve site characterization, several options exist including collecting more samples, providing on-site analytical data to help direct the investigation, compositing samples, improving homogenization of the samples, and extracting larger samples. This publication is intended to provide guidance to Remedial Project Managers regarding field sampling and on-site analytical methods for detecting and quantifying secondary explosive compounds in soils, and is not intended to include discussions of the safety issues associated with sites contaminated with explosive residues.

  18. Rapid On-Site Formation of a Free-Standing Flexible Optical Link for Sensing Applications

    Directory of Open Access Journals (Sweden)

    Carlos Angulo Barrios

    2016-10-01

    Full Text Available An optical link, based on a conventional Scotch tape waveguide, for sensing applications requiring rapid on-site assembly is proposed and demonstrated. The flexible waveguide contains an integrated aluminum one-dimensional grating coupler that, when stuck on the radiative surface of a light emitting device, allows light to be coupled in and transmitted through the tape, whose tip end is, in turn, adhered onto the photosensitive surface of a photodetector. The (decoupling approaches exhibit high alignment tolerances that permit the formation of a free-standing flexible optical connection between surface-normal optoelectronic devices without the need of specialized equipment. As the first demonstration of a sensing application, the proposed optical link is easily configured as a cost-effective intensity-based refractometric sensor for liquid detection, which can be applicable to on-site quality and process control of, for example, beverages.

  19. 1000kW on-site PAFC power plant development and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Satomi, Tomohide; Koike, Shunichi [Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA), Osaka (Japan); Ishikawa, Ryou [New Energy and Industrial Technology Development Organization (NEDO), Tokyo (Japan)

    1996-12-31

    Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA) and New Energy and Industrial Technology Development Organization (NEDO) have been conducting a joint project on development of a 5000kW urban energy center type PAFC power plant (pressurized) and a 1000kW on-site PAFC power plant (non-pressurized). The objective of the technical development of 1000kW on-site PAFC power plant is to realize a medium size power plant with an overall efficiency of over 70% and an electrical efficiency of over 36%, that could be installed in a large building as a cogeneration system. The components and system integration development work and the plant design were performed in 1991 and 1992. Manufacturing of the plant and installation at the test site were completed in 1994. PAC test was carried out in 1994, and generation test was started in January 1995. Demonstration test is scheduled for 1995 and 1996.

  20. Analysis of acoustic-seismic coupling behaviour for CTBT on-site inspection performance improvement

    Energy Technology Data Exchange (ETDEWEB)

    Liebsch, Mattes; Knoop, Jan-Frederik [Technische Univ. Dortmund (Germany)

    2013-07-01

    After teleseismic detection of a big underground explosion, during on-site inspections under the Comprehensive Nuclear Test-Ban Treaty (CTBT) weak seismic signals from aftershocks are to be detected. These, however, can be masked by soil vibrations which are caused by acoustic waves which couple to the ground. To analyse the coupling behaviour between acoustic waves and soil vibrations several experiments with different acoustic sources (helicopters, firecrackers, loudspeaker) were performed. Of special interest is the influence of surface waves, excited in a larger area around the sensor, which can superpose constructively at the position of the sensor and can increase the measured seismic signal. A better understanding of the acoustic-seismic coupling can be used to develop guidelines for seismic aftershock measurements, such as a suitable sensor setup, with the goal of reducing or even preventing disturbing signals to improve the performance of on-site inspections for the CTBT.

  1. A Review of On-Site Wastewater Treatment Systems in Western Australia from 1997 to 2011

    OpenAIRE

    Maria Gunady; Natalia Shishkina; Henry Tan; Clemencia Rodriguez

    2015-01-01

    On-site wastewater treatment systems (OWTS) are widely used in Western Australia (WA) to treat and dispose of household wastewater in areas where centralized sewerage systems are unavailable. Septic tanks, aerobic treatment units (ATUs), and composting toilets with greywater systems are among the most well established and commonly used OWTS. However, there are concerns that some OWTS installed in WA are either performing below expected standards or failing. Poorly performing OWTS are often at...

  2. Portable gas chromatograph mass spectrometer for on-site chemical analyses

    Energy Technology Data Exchange (ETDEWEB)

    Haas, Jeffrey S. (San Ramon, CA); Bushman, John F. (Oakley, CA); Howard, Douglas E. (Livermore, CA); Wong, James L. (Livermore, CA); Eckels, Joel D. (Livermore, CA)

    2002-01-01

    A portable, lightweight (approximately 25 kg) gas chromatograph mass spectrometer, including the entire vacuum system, can perform qualitative and quantitative analyses of all sample types in the field. The GC/MS has a conveniently configured layout of components for ease of serviceability and maintenance. The GC/MS system can be transported under operating or near-operating conditions (i.e., under vacuum and at elevated temperature) to reduce the downtime before samples can be analyzed on-site.

  3. Feasibility Evaluation of an On-site Generator Network by the Cooperative Game Theory

    Science.gov (United States)

    Komiyama, Ryoichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    On-site generator, such as CGS (cogeneration system), is allegedly considered to be an effective end-use energy system in order to accomplish primary energy conservation, CO2 emission mitigation and system cost reduction, which characteristics eventually improve the whole performance of an existing energy system for the future. Considering the drawback of installing an end-use CGS into the customer with small or middle scale floor space, however, it is difficult to achieve those distinctive features because the thermal-electricity ratio of CGS does not always be in agreement with that of customer energy demand. In order to overcome that matching deficiency, it is hence better to organize an on-site generator network based on mutual electricity and heating transmission. But focusing on some cogenerators underlying their behaviors on maximizing their own profits, this on-site network, which situation corresponds to a grand coalition, is not necessarily established because of each cogenerator’s motivation to form a partial coalition and acquire its own profit as much as possible. In this paper, we attempt to analyze the optimal operation of an on-site generator network and identify by applying the nucleolus of the cooperative game theory the optimal benefit allocation strategy in order for the cogenerators to construct the network. Regarding the installation site of this network, the center of Tokyo area is assumed, which locational information includes floor space and so forth through a GIS (geographic information system) database. The results from the nucleolus suggest that all districts should impartially obtain the benefit from organizing network for the purpose of jointly attaining the system total cost reduction.

  4. Using Automated On-Site Monitoring to Calibrate Empirical Models of Trihalomethanes Concentrations in Drinking Water

    OpenAIRE

    Thomas E. Watts III; Robyn A. Snow; Brown, Aaron W.; J. C. York; Greg Fantom; Paul S. Simone Jr.; Gary L. Emmert

    2015-01-01

    An automated, on-site trihalomethanes concentration data set from a conventional water treatment plant was used to optimize powdered activated carbon and pre-chlorination doses. The trihalomethanes concentration data set was used with commonly monitored water quality parameters to improve an empirical model of trihalomethanes formation. A calibrated model was used to predict trihalomethanes concentrations the following year. The agreement between the models and measurements was evaluated. The...

  5. Optimal selection of on-site generation with combined heat andpower applications

    Energy Technology Data Exchange (ETDEWEB)

    Siddiqui, Afzal S.; Marnay, Chris; Bailey, Owen; HamachiLaCommare, Kristina

    2004-11-30

    While demand for electricity continues to grow, expansion of the traditional electricity supply system, or macrogrid, is constrained and is unlikely to keep pace with the growing thirst western economies have for electricity. Furthermore, no compelling case has been made that perpetual improvement in the overall power quality and reliability (PQR)delivered is technically possible or economically desirable. An alternative path to providing high PQR for sensitive loads would generate close to them in microgrids, such as the Consortium for Electricity Reliability Technology Solutions (CERTS) Microgrid. Distributed generation would alleviate the pressure for endless improvement in macrogrid PQR and might allow the establishment of a sounder economically based level of universal grid service. Energy conversion from available fuels to electricity close to loads can also provide combined heat and power (CHP) opportunities that can significantly improve the economics of small-scale on-site power generation, especially in hot climates when the waste heat serves absorption cycle cooling equipment that displaces expensive on-peak electricity. An optimization model, the Distributed Energy Resources Customer Adoption Model (DER-CAM), developed at Berkeley Lab identifies the energy bill minimizing combination of on-site generation and heat recovery equipment for sites, given their electricity and heat requirements, the tariffs they face, and a menu of available equipment. DER-CAM is used to conduct a systemic energy analysis of a southern California naval base building and demonstrates atypical current economic on-site power opportunity. Results achieve cost reductions of about 15 percent with DER, depending on the tariff.Furthermore, almost all of the energy is provided on-site, indicating that modest cost savings can be achieved when the microgrid is free to select distributed generation and heat recovery equipment in order to minimize its over all costs.

  6. Training of medical teams on-site for individual and coordinated response in emergency management

    DEFF Research Database (Denmark)

    Andersen, Verner

    2003-01-01

    involved in the complete preparedness: fire brigade, police, medical team, civil defence, etc. All these modules will in the end be integrated on a common integration platform, either to a fully-fledged system covering all aspects of training for the complete preparedness, or for creating a dedicated...... system for specific training set-ups for specific groups of trainees. The first module completed as a commercial system, "Training of medical teams on site", will be presented....

  7. Performance evaluation of telemetry stations based on site selection (Short Communication)

    OpenAIRE

    M. Goswami; B. Sucharita; P. Arya

    2003-01-01

    In a test range, selection of sites for deployment of mobile telemetry stations plays a crucial role for acquiring and tracking any airborne vehicle under test. Efforts have been made to correlate the tracking performance of the auto track stations based on site selection for various test flights conducted from different launching pads. Some of the tracking methodologies discussed in this paper are single channel amplitude comparison monopulse (SCACMP) technique and E-SCAN technique. A...

  8. 77 FR 70477 - Verso Paper Corporation, Sartell Mill Division, Including On-Site Leased Workers From Securitas...

    Science.gov (United States)

    2012-11-26

    ... to the production of coated mechanical and supercalendered paper for various commercial printing... revealed that the subject worker group includes on- site leased workers from several commercial entities...

  9. On-site electronic observational assessment tool for discomfort and pain.

    Science.gov (United States)

    Schiepers, Pieter; Bonroy, Bert; Leysens, Greet; Miljkovic, Dragana; De Maesschalck, Lieven; Quanten, Stijn; Vanrumste, Bart; Berckmans, Daniel

    2010-07-01

    Over the recent years pen-paper observational assessment scales have proven to be useful to monitor behaviour and responses of humans and animals. Observational assessment tools are typically applied for subjects who are not able to communicate directly. For on-site observational assessment however it is hard to record and evaluate timing patterns of observed events using pen-paper scales. Although timing information is in many cases assumed highly valuable, only (videotaped) laboratory scales are able to benefit from this knowledge. In the work described in this paper we digitize pen-paper assessment scales resulting in new functionalities capable to improve assessment scores. A study of on-site pain and discomfort assessment of severely demented elderly is presented. The resulting system is a mobile electronic device with a graphical user interface (GUI) on a touch screen. Moreover digital information is stored in a database improving administration, providing immediate feedback and allowing applications like: visualisation, statistical analysis and scientific research like data mining. The device allows easily registering and automatically interpreting complex timing patterns of behaviours and responses, on-site. This feature could be employed in the development of new more accurate observational assessment instruments.

  10. New Technological Charts for Concreting Operations on Site for Civil Constructions

    Directory of Open Access Journals (Sweden)

    René Antonio Puig Martínez

    2014-03-01

    Full Text Available The on site concreting of constructions, require some regulations to guide the construction companiesto execute the concreting operations according to the status and potential of existing technologies.In Cuba were used for a long time many regulations and construction technical standards issued bythe Ministry of Construction and relating companies, and was published in 1990 the only one versionof Technological Charts for concreting operations on site, about the existing constructions in Cuba,that are in obsolescence in this moment. During more than two decades, the country has experimentedvery rapidly develop of on site concreting technologies according with the development achieved bythe construction industry, importing or producing new efficient and productive equipments. The newtechnological charts are the result of the authors research project. They have proposed the suitableprocedures for the preparation, transportation, pouring, compaction and curing of the concrete mix incorrespondence with the country "state of the art", and the consumption normative of workers,equipments, time and costs of these activities, using the "concreting flow" as a regulator of theconcreting system.

  11. 77 FR 46127 - Interim Staff Guidance on Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2...

    Science.gov (United States)

    2012-08-02

    ... COMMISSION Interim Staff Guidance on Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2... Learned (GALL) Report,'' and the NRC staff's aging management review procedure and acceptance criteria... learned and to address emergent issues not covered in license renewal guidance documents. In this way,...

  12. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Science.gov (United States)

    2010-11-17

    ... most Internet search engines. Comments may be submitted anonymously. Department of Labor. Comments to... were published in the Federal Register on June 17, 2010 (75 FR 34538). Additionally, on September 20... FR 34538). Paragraph (a)(1)(ii) of the interim final regulations provides that if a group health...

  13. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Science.gov (United States)

    2010-07-01

    ... Certificate: what is it and when can it be used? 96.360 Section 96.360 Navigation and Navigable Waters COAST...? § 96.360 Interim Safety Management Certificate: what is it and when can it be used? (a) A responsible... 6 months. It may be issued to a U.S. vessel which meets the conditions of paragraph (a) of...

  14. Television as a Socialization Factor: Interim Results of a Study Concerning the Effects of Television Violence on Viewers' Behaviour

    Science.gov (United States)

    Kellner, Hella

    1978-01-01

    The results of the initial study suggested that the question of effects of television violence could be answered meaningfully only in the same context as the question of the social effect of television. Interim results reported here support this hypothesis. (Author)

  15. 78 FR 3039 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-06; Performing a...

    Science.gov (United States)

    2013-01-15

    ... guidance prior to its issuance formally for public comment. On October 26, 2012 (77 FR 65417), the NRC... COMMISSION Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-06; Performing a Tsunami, Surge, or Seiche Hazard Assessment AGENCY: Nuclear Regulatory Commission. ACTION: Japan...

  16. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Science.gov (United States)

    2010-04-01

    ... pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF...-kindergarten Programs § 39.1100 Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. Those schools having pre-kindergarten programs funded fully or...

  17. 75 FR 53353 - Notice of Availability of Final Interim Staff Guidance Document No. 25 “Pressure and Helium...

    Science.gov (United States)

    2010-08-31

    ... COMMISSION Notice of Availability of Final Interim Staff Guidance Document No. 25 ``Pressure and Helium... Guidance Document No. 25 (ISG-25) ``Pressure and Helium Leakage Testing of the Confinement Boundary of... helium leakage testing and ASME Code required pressure (hydrostatic/pneumatic) testing that is...

  18. 75 FR 26981 - Notice of Establishment of Interim Final Supplementary Rules for Public Lands Managed by the...

    Science.gov (United States)

    2010-05-13

    ..., protect natural and cultural resources, improve recreational opportunities, and protect public health. All... safety concerns and resource protection needs within the management area. All of the interim final... Managed by the Mother Lode Field Office, California AGENCY: Bureau of Land Management, Interior....

  19. 77 FR 4492 - Endangered and Threatened Wildlife and Plants; Reissuance of Interim Special Rule for the Polar Bear

    Science.gov (United States)

    2012-01-30

    ... Wildlife Service the December 16, 2008, final special rule for the polar bear (73 FR 76249). The Court..., 2008 (73 FR 28306), shall remain in effect until superseded by the new special rule for the polar bear... the polar bear (73 FR 76249), the Court further ordered that, in its place, the interim final...

  20. 75 FR 8412 - Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of...

    Science.gov (United States)

    2010-02-24

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of... Sections 2.4.12 and 2.4.13 regarding the assessment of ground water flow and transport of...

  1. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Science.gov (United States)

    2011-03-28

    .... SUMMARY: The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-018 (Agencywide... of ] the design certification (DC) and combined license (COL) applications. The NRC staff issues DC/COL-ISGs to facilitate timely implementation of current staff guidance and to facilitate...

  2. 75 FR 16202 - Office of New Reactors; Interim Staff Guidance on Ensuring Hazard-Consistent Seismic Input for...

    Science.gov (United States)

    2010-03-31

    ...) DC/COL-ISG-017 titled ``Ensuring Hazard-Consistent Seismic Input for Site Response and Soil Structure..., and DC/COL-ISG-01, ``Interim Staff Guidance on Seismic Issues Associated with High Frequency Ground... No. ML081400293). The NRC staff issues DC/COL-ISGs to facilitate timely implementation of...

  3. Leading Curriculum Innovation in Primary Schools Project: An Interim Report on School Leaders' Roles in Curriculum Development in England

    Science.gov (United States)

    Brundrett, Mark; Duncan, Diane; Rhodes, Christopher

    2010-01-01

    This article provides an interim report on a two-phase study of curriculum innovation in primary schools in England during one of the most significant periods of change for the last two decades. More specifically, the study addresses the challenges to school leaders created by the Rose Review of the primary curriculum. This article presents and…

  4. 75 FR 8411 - Office of New Reactors: Interim Staff Guidance on Assessing the Consequences of an Accidental...

    Science.gov (United States)

    2010-02-24

    ... Gallagher at 301-492-3668; e-mail at Carol.Gallagher@nrc.gov . Mail comments to: Michael T. Lesar, Chief... on May 4, 2009 (74 FR 20510), on its Proposed Interim Staff Guidance (ISG) DC/ COL-ISG-013...

  5. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Science.gov (United States)

    2010-03-22

    ... authorized by FTZ Board Orders 1347 (69 FR 52857, 8/30/04) and 1480 (71 FR 55422, 9/22/06), including notice in the Federal Register inviting public comment (75 FR 4344, January 27, 2010). The FTZ staff... Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG...

  6. 76 FR 72006 - Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon...

    Science.gov (United States)

    2011-11-21

    ... COMMISSION Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance with 10 CFR 20... that existing guidance does not sufficiently detail how the NRC staff reviews surveys of radon...

  7. 78 FR 33120 - Final Interim Staff Guidance LR-ISG-2011-04; Updated Aging Management Criteria for Reactor Vessel...

    Science.gov (United States)

    2013-06-03

    ... Internal Components for Pressurized Water Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Interim... Reactor Vessel Internal Components for Pressurized Water Reactors.'' This final LR-ISG revises the... components exposed to reactor coolant environments. ADDRESSES: Please refer to Docket ID NRC-2012-0070...

  8. ALERTES-SC3 Early Warning System prototype for South Iberian Peninsula: on-site approach.

    Science.gov (United States)

    Pazos, Antonio; Lopez de Mesa, Mireya; Gallego Carrasco, Javier; Martín Davila, José; Rioja del Rio, Carlos; Morgado, Arturo; Vera, Angel; Ciberia, Angel; Cabieces, Roberto; Strollo, Angelo; Hanka, Winfried; Carranza, Marta

    2016-04-01

    In recent years several Earthquake Early Warning Systems (EEWS) have been developed for different parts of the world. The area between SW Cape St. Vicente and the Strait of Gibraltar is one of the most seismically active zones in the Ibero-Maghrebian region, with predominantly moderate and superficial seismicity, but also big events with associated tsunamis are well documented in the area, like the 1755 Lisbon earthquake. In the frame of the ALERT-ES (2011-2013) and ALERTES-RIM (2014-2016) Spanish projects, the ALERTES-SC3 EEWS, regional approach, prototype has been developed at the Royal Spanish Navy Observatory (ROA) and is being tested in near real time for south Iberia. This prototype, based on the SeisComP3 software package, is largely based on algorithms derived from the analysis of the first seconds of the P wave records. Calculation of several parameters are carried out, mainly the characteristic period (τc) and the displacement peak (Pd), but also the velocity peak (Pv), the maximum period (τPmáx), among others. In order to warm the areas closest to the hypocentre, places located inside the "blind zone", a on-site EEWS has also been developed by ROA and integrated in the ALERTES-SC3 prototype. From the on-site approach, a warm level is declared from one station as a function of the estimated characteristic period (τc) and the displacement Peak (Pd), although the earthquake location and therefore the lead time available remains unknown. This on-site EEWS is being tested in several Western Mediterranean net (WM) stations as ARNO (Arenosillo, Huelva,Spain) or CHAS (Chafarinas island, North Africa, Spain). Also an on-site low cost station is being developed based in low cost accelerometers. In this work the current state of the on-site EEWS developed, its integration in the ALERTES-SC3 EEWS system and the low cost seismic stations are shown.

  9. Testing the applicability of rapid on-site enzymatic activity detection for surface water monitoring

    Science.gov (United States)

    Stadler, Philipp; Vogl, Wolfgang; Juri, Koschelnik; Markus, Epp; Maximilian, Lackner; Markus, Oismüller; Monika, Kumpan; Peter, Strauss; Regina, Sommer; Gabriela, Ryzinska-Paier; Farnleitner Andreas, H.; Matthias, Zessner

    2015-04-01

    On-site detection of enzymatic activities has been suggested as a rapid surrogate for microbiological pollution monitoring of water resources (e.g. using glucuronidases, galactosidases, esterases). Due to the possible short measuring intervals enzymatic methods have high potential as near-real time water quality monitoring tools. This presentation describes results from a long termed field test. For twelve months, two ColiMinder devices (Vienna Water Monitoring, Austria) for on-site determination of enzymatic activity were tested for stream water monitoring at the experimental catchment HOAL (Hydrological Open Air Laboratory, Center for Water Resource Systems, Vienna University of Technology). The devices were overall able to follow and reflect the diverse hydrological and microbiological conditions of the monitored stream during the test period. Continuous data in high temporal resolution captured the course of enzymatic activity in stream water during diverse rainfall events. The method also proofed sensitive enough to determine diurnal fluctuations of enzymatic activity in stream water during dry periods. The method was able to capture a seasonal trend of enzymatic activity in stream water that matches the results gained from Colilert18 analysis for E. coli and coliform bacteria of monthly grab samples. Furthermore the comparison of ColiMinder data with measurements gained at the same test site with devices using the same method but having different construction design (BACTcontrol, microLAN) showed consistent measuring results. Comparative analysis showed significant differences between measured enzymatic activity (modified fishman units and pmol/min/100ml) and cultivation based analyses (most probable number, colony forming unit). Methods of enzymatic activity measures are capable to detect ideally the enzymatic activity caused by all active target bacteria members, including VBNC (viable but nonculturable) while cultivation based methods cannot detect VBNC

  10. Prognostic value of interim 18F-FDG PET/CT in diffuse large B-cell lymphoma

    Institute of Scientific and Technical Information of China (English)

    Zhitao Ying; Xuejuan Wang; Yuqin Song; Wen Zheng; Xiaopei Wang; Yan Xie; Ningjing Lin

    2013-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a heterogeneous disease.The prognostic factor currently used is not accurate enough to predict the outcomes of patients with DLBCL.The prognostic significance of interim PET/CT in DLBCL remains controversial.The aim of this study is to determine the predictive value of interim 18F-FDG PET/CT after first-line treatment in patients with DLBCL.Methods:Thirty-two patients with DLBCL underwent baseline,interim and post-treatment 18F-FDG PET/CT scans.Imaging results were analyzed for the survival of patients via software SPSS 13.0,retrospectively.Results:Thirty-one of the 32 patients were treated with R-CHOP regimen,and interim 18F-FDG PET/CT of 24 patients was performed after 2 cycles of treatment.After a median follow-up period of 16.7 months,the 2-year progression-free survival (PFS) rates were significandy different between the groups above and below SUVmax cut-off value of 2.5 (P=0.039).No significant differences were found in the 2-year PFS rates if SUVmax cut-offvalues were set as 2.0 and 3.0,respectively (P=0.360; P=0.113).Conclusions:Interim PET/CT could predict the prognosis of DLBCL patients with the SUVmax cut-off value of 2.5,but more clinical data should be concluded to confirm this conclusion.

  11. Data Analysis of GPM Constellation Satellites-IMERG and ERA-Interim precipitation products over West of Iran

    Science.gov (United States)

    Sharifi, Ehsan; Steinacker, Reinhold; Saghafian, Bahram

    2016-04-01

    Precipitation is a critical component of the Earth's hydrological cycle. The primary requirement in precipitation measurement is to know where and how much precipitation is falling at any given time. Especially in data sparse regions with insufficient radar coverage, satellite information can provide a spatial and temporal context. Nonetheless, evaluation of satellite precipitation is essential prior to operational use. This is why many previous studies are devoted to the validation of satellite estimation. Accurate quantitative precipitation estimation over mountainous basins is of great importance because of their susceptibility to hazards. In situ observations over mountainous areas are mostly limited, but currently available satellite precipitation products can potentially provide the precipitation estimation needed for meteorological and hydrological applications. One of the newest and blended methods that use multi-satellites and multi-sensors has been developed for estimating global precipitation. The considered data set known as Integrated Multi-satellitE Retrievals (IMERG) for GPM (Global Precipitation Measurement) is routinely produced by the GPM constellation satellites. Moreover, recent efforts have been put into the improvement of the precipitation products derived from reanalysis systems, which has led to significant progress. One of the best and a worldwide used model is developed by the European Centre for Medium Range Weather Forecasts (ECMWF). They have produced global reanalysis daily precipitation, known as ERA-Interim. This study has evaluated one year of precipitation data from the GPM-IMERG and ERA-Interim reanalysis daily time series over West of Iran. IMERG and ERA-Interim yield underestimate the observed values while IMERG underestimated slightly and performed better when precipitation is greater than 10mm. Furthermore, with respect to evaluation of probability of detection (POD), threat score (TS), false alarm ratio (FAR) and probability

  12. 76 FR 79221 - Android Industries Belvidere, LLC, Including On-Site Leased Workers From QPS Employment Group...

    Science.gov (United States)

    2011-12-21

    ... notice was published in the Federal Register on July 16, 2010 (75 FR 41526). At the request of the State... Employment and Training Administration Android Industries Belvidere, LLC, Including On-Site Leased Workers... Android Industries Belvidere, LLC, including on-site leased workers from QPS Employment Group and...

  13. 77 FR 12081 - Comscope, Inc., Catawba Facility, A Subsidiary of the Carlyle Group Including On-Site Leased...

    Science.gov (United States)

    2012-02-28

    ... Carolina. The workers are engaged in activities related to the production of coaxial cable and coax products for the cable television industry. The notice was published in the Federal Register on October 26... Including On-Site Leased Workers From Staffmasters, Including On- Site Workers from Cable Transport,...

  14. 78 FR 12358 - Cardinal Health, Financial Shared Services West, Including On-Site Leased Workers From Aerotek...

    Science.gov (United States)

    2013-02-22

    ... Employment and Training Administration Cardinal Health, Financial Shared Services West, Including On- Site..., Financial Shared Services West, including on-site leased workers from Aerotek, eXcel Staffing, and Experis... these workers were sufficiently under the control of Cardinal Health, Financial Shared Services West...

  15. 75 FR 11921 - Heritage Aviation, Ltd., Including On-Site Leased Workers From Global Technical Services and...

    Science.gov (United States)

    2010-03-12

    ... the Federal Register on February 16, 2010 (75 FR 7033). At the request of the State Agency, the... Employment and Training Administration Heritage Aviation, Ltd., Including On-Site Leased Workers From Global... workers of Heritage Aviation, including on-site leased workers from Heritage Aviation, Ltd, including...

  16. 75 FR 41522 - Hewlett Packard, Technical Support Call Center, Including On-Site Leased Workers From Manpower...

    Science.gov (United States)

    2010-07-16

    ... Employment and Training Administration Hewlett Packard, Technical Support Call Center, Including On-Site... workers of Hewlett Packard, Technical Support Call Center, including on-site leased workers from Manpower, Volt, and Adecco, Boise, Idaho. The notice was published in the Federal Register March 12, 2010 (75...

  17. 77 FR 21588 - Hart and Cooley, Inc., A Subsidiary of Tomkins, PLC Including On-Site Leased Workers from...

    Science.gov (United States)

    2012-04-10

    ... of determination was published in the Federal Register on April 23, 2010 (75 FR 21354). At the... Employment and Training Administration Hart and Cooley, Inc., A Subsidiary of Tomkins, PLC Including On- Site... subsidiary of Tomkins, PLC, including on-site leased workers from Reliable, Masiello Employment...

  18. 75 FR 38128 - Ceva Freight, LLC, Dell Logistics Division, Including On-Site Leased Workers From Prologistix and...

    Science.gov (United States)

    2010-07-01

    ..., LLC, Dell Logistics Division, including on-site leased workers from Prologistix, Winston-Salem, North Carolina. The notice was published in the Federal Register on April 23, 2010 (75 FR 21357). At the request... Employment and Training Administration Ceva Freight, LLC, Dell Logistics Division, Including On-Site...

  19. 75 FR 452 - Tenneco, Inc.; Including On-Site Workers From Elite Staffing, Inc.; Cozad, NE; Tenneco, Inc...

    Science.gov (United States)

    2010-01-05

    ... Federal Register on February 2, 2009 (74 FR Number 5871). The Department issued an amended certification... Employment and Training Administration Tenneco, Inc.; Including On-Site Workers From Elite Staffing, Inc.; Cozad, NE; Tenneco, Inc.; Including On-Site Leased Workers of Elite Staffing, Inc.; Monroe, MI;...

  20. 78 FR 49292 - Northshore Mining Company, a Subsidiary of Cliffs Natural Resources, Including On-Site Leased...

    Science.gov (United States)

    2013-08-13

    ... Employment and Training Administration Northshore Mining Company, a Subsidiary of Cliffs Natural Resources..., Minnesota; Northshore Mining Company, a Subsidiary of Cliffs Natural Resources, Including On- Site Leased... Miming Company, a subsidiary of Cliffs Natural Resources, including on-site leased workers from...