WorldWideScience

Sample records for bevalac 1974-1977 planning

  1. Biological and medical research with accelerated heavy ions at the Bevalac, 1974--1977. [Planning for use for radiotherapy and as radiation source for diagnostic radiography

    Energy Technology Data Exchange (ETDEWEB)

    Elam, S. (ed.)

    1977-04-01

    The Bevalac, a versatile high-energy heavy-ion accelerator complex, has been in operation for less than two years. A major purpose for which the Bevalac was constructed was to explore the possibility of heavy-ion teams for therapy for certain forms of cancer. Significant progress has been made in this direction. The National Cancer Institute has recognized the advantages that these and other accelerated particles offer, and heavy ions have been included in a long-term plan for particle therapy that will assess by means of controlled therapeutic tests the value of various modalities. Since accelerated heavy ions became available, the possibility of other contributions, not planned, became apparent. We are developig a new diagnostic method known as heavy-ion radiography that has greatly increased sensitivity for soft-tissue detail and that may become a powerful tool for localizing early tumors and metastases. We have discovered that radioactive beams are formed from fragmentation of stable deflected beams. Use of these autoradioactive beams is just beginning; however, we know that these beams will be helpful in localizing the region in the body where therapy is being delivered. In addition, it has been demonstrated that instant implantation of the radioactive beam allows direct measurements of blood perfusion rates in inaccessible parts of the body, and such a technique may become a new tool for the study of fast hot atom reactions in biochemistry, tracer biology and nuclear medicine. The Bevalac will also be useful for the continuation of previously developed methods for the control of acromegaly, Cushing's disease and, on a research basis, advanced diabetes mellitus with vascular disease. The ability to make small bloodless lesions in the brain and elsewhere with heavy-ion beams has great potential for nervous-system studies and perhaps later for radioneurosurgery.

  2. Biological and medical research with accelerated heavy ions at the Bevalac, 1974--1977

    International Nuclear Information System (INIS)

    Elam, S.

    1977-04-01

    The Bevalac, a versatile high-energy heavy-ion accelerator complex, has been in operation for less than two years. A major purpose for which the Bevalac was constructed was to explore the possibility of heavy-ion teams for therapy for certain forms of cancer. Significant progress has been made in this direction. The National Cancer Institute has recognized the advantages that these and other accelerated particles offer, and heavy ions have been included in a long-term plan for particle therapy that will assess by means of controlled therapeutic tests the value of various modalities. Since accelerated heavy ions became available, the possibility of other contributions, not planned, became apparent. We are developig a new diagnostic method known as heavy-ion radiography that has greatly increased sensitivity for soft-tissue detail and that may become a powerful tool for localizing early tumors and metastases. We have discovered that radioactive beams are formed from fragmentation of stable deflected beams. Use of these autoradioactive beams is just beginning; however, we know that these beams will be helpful in localizing the region in the body where therapy is being delivered. In addition, it has been demonstrated that instant implantation of the radioactive beam allows direct measurements of blood perfusion rates in inaccessible parts of the body, and such a technique may become a new tool for the study of fast hot atom reactions in biochemistry, tracer biology and nuclear medicine. The Bevalac will also be useful for the continuation of previously developed methods for the control of acromegaly, Cushing's disease and, on a research basis, advanced diabetes mellitus with vascular disease. The ability to make small bloodless lesions in the brain and elsewhere with heavy-ion beams has great potential for nervous-system studies and perhaps later for radioneurosurgery

  3. Bevalac extraction

    International Nuclear Information System (INIS)

    Kalnins, J.G.; Krebs, G.; Tekawa, M.; Cowles, D.; Byrne, T.

    1992-02-01

    This report will describe some of the general features of the Bevatron extraction system, primarily the dependence of the beam parameters and extraction magnet currents on the Bevalac field. The extraction magnets considered are: PFW, XPl, XP2, XS1, XS2, XM1, XM2, XM3, XQ3A and X03B. This study is based on 84 past tunes (from 1987 to the present) of various ions (p,He,O,Ne,Si,S,Ar,Ca,Ti,Fe,Nb,La,Au and U), for Bevalac fields from 1.749 to 12.575 kG, where all tunes included a complete set of beam line wire chamber pictures. The circulating beam intensity inside the Bevalac is measured with Beam Induction Electrodes (BIE) in the South Tangent Tank. The extracted beam intensity is usually measured with the Secondary Emission Monitor (SEM) in the F1-Box. For most of the tunes the extraction efficiency, as given by the SEM/BIE ratio, was not recorded in the MCR Log Book, but plotting the available Log Book data as a function of the Bevalac field, see Fig.9, we find that the extraction efficiency is typically between 30->60% with feedback spill

  4. Bevalac user's handbook

    International Nuclear Information System (INIS)

    1990-04-01

    This report is a users manual on the Bevalac accelerator facility. This paper discuses: general information; the Bevalac and its operation; major facilities and experimental areas; and experimental equipment

  5. Bevalac operations update

    International Nuclear Information System (INIS)

    1991-02-01

    The Bevalac passed the recent Tiger Team assessment with flying colors, thanks to the unremitting effort of countless people over the last several months, pulling miles of cables, sending tons of ''valuable'' junk to salvage, painting, pushing brooms, writing operating procedures. It is time to look ahead now and plan for doing science again; however, it is not business as usual. The Bevalac survived, but not without changes. There are more procedures to be followed, safety appraisals to be made, training to be gone through. The primary goal is not just to get a task done, but to get it done in a safe manner according to code. If this means a delay in a run because enough time wasn't allotted for making a change in the setup, then the experiment will be delayed. Many of the obvious changes you will find the next time you come to work here are summarized in this newsletter. We will inform you of others as they are forthcoming. Also we will discuss these changes at our ''We Survived the Tigers, but hor-ellipsis'' Users' Information Meeting at the Washington APS meeting. Details are inside this report

  6. Bevalac computer support group

    International Nuclear Information System (INIS)

    McParland, C.; Bronson, M.

    1985-01-01

    During the past year, a group was created and placed under the leadership of Charles McParland. This is an expansion of previous Bevalac software efforts and has responsibilities in three major hardware and software areas. The first area is the support of the existing data acquisition/analysis VAX 11/780s at the Bevalac. The second area is the continued support of present data acquisition programs. The third principal area of effort is the development of new data acquisition systems to meet the increasing needs of the Bevalac experimental program

  7. Bevalac external beamline optics

    Energy Technology Data Exchange (ETDEWEB)

    Kalnins, J.G.; Krebs, G.F.; Tekawa, M.M.; Alonso, J.R.

    1987-04-01

    This handbook is intended as an aid for tuning the external particle beam (EPB) lines at the Lawrence Berkeley Laboratory's Bevalac. The information contained within will be useful to the Bevalac's Main Control Room and experimenters alike. First, some general information is given concerning the EPB lines and beam optics. Next, each beam line is described in detail: schematics of the beam line components are shown, all the variables required to run a beam transport program are presented, beam envelopes are given with wire chamber pictures and magnet currents, focal points and magnifications. Some preliminary scaling factors are then presented which should aid in choosing a given EPB magnet's current for a given central Bevalac field. Finally, some tuning hints are suggested.

  8. Bevalac external beamline optics

    International Nuclear Information System (INIS)

    Kalnins, J.G.; Krebs, G.F.; Tekawa, M.M.; Alonso, J.R.

    1987-04-01

    This handbook is intended as an aid for tuning the external particle beam (EPB) lines at the Lawrence Berkeley Laboratory's Bevalac. The information contained within will be useful to the Bevalac's Main Control Room and experimenters alike. First, some general information is given concerning the EPB lines and beam optics. Next, each beam line is described in detail: schematics of the beam line components are shown, all the variables required to run a beam transport program are presented, beam envelopes are given with wire chamber pictures and magnet currents, focal points and magnifications. Some preliminary scaling factors are then presented which should aid in choosing a given EPB magnet's current for a given central Bevalac field. Finally, some tuning hints are suggested

  9. The Bevalac Upgrade Project

    International Nuclear Information System (INIS)

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact

  10. Bevalac operations update. No. 3

    International Nuclear Information System (INIS)

    1986-10-01

    Activities are reported in these areas: Bevatron operations (including a list of major experimental runs), user support at the Bevalac, modifications to the local injector, accelerator improvements at the Super HILAC, and general Bevalac upgrading. Modifications are reported for six individual beam lines

  11. The Bevalac long flattop

    International Nuclear Information System (INIS)

    Celata, C.M.; Abbott, S.; Bennett, M.; Bordua, M.; Calvert, J.; Dwinell, R.; Howard, D.; Hunt, D.; Feinberg, B.; Force, R.; Frias, R.; Kalnins, J.; Lewis, S.; Nyman, M.; Shalz, L.; Solomons, S.R.; Tekawa, M.

    1992-10-01

    Until July of 1992, the maximum length of the Bevalac flattop was 2 seconds, limiting the beam spill to 1.5 seconds. The normal running condition was a 1.5 second flattop, with a 1.0 second beam spill. If we define the duty factor as the spill length (in time) divided by the synchrotron pulse length, that is, the percentage of time the Bevalac can deliver beam to experiments, the duty factor for the 1.5 second flattop ranged from 17% (at full field, i.e., 12575 G) to 25% (low field). The purpose of the Long Flattop Project was to increase the length of the flattop, thus increasing the duty factor of the machine, and its efficiency for experiments. This has been done, with resultant increase in the duty factor and experimental data rate. It is now possible to run with duty factor of about 80% for low fields, falling to about 60% at 10 kG, and 34% at full field. This report documents what was done, and its limitations. It should be noted that increasing the length of the beam spill is only possible if the source can produce more beam per pulse than is usable by the experimenter. Experimenters running at full intensity with a short flattop (1.5 seconds) cannot benefit from a longer flattop. This paper describe the changes that have been made to Bevalac systems to make the long flattop possible, the limits put on the length of the flattop by existing hardware, and the procedure for tuning for the long flattop

  12. Bevalac Radiotherapy Facility

    International Nuclear Information System (INIS)

    Alonso, J.R.; Howard, J.; Criswell, T.

    1979-03-01

    Patient Treatment Room at the Bevalac is now in full operation. In the design of this facility, emphasis has been placed on creating an atmosphere appropriate to a clinical facility; the usual features of an irradiation cave have been hidden behind carpets, curtains and paint. Patient positioning is done with a Philips Ram-style couch, with additional fixtures to accommodate a patient in the seated or standing, as well as the supine, position. Dosimetry apparatus, collimators, ion chambers and the beam flattening system used to produce the highly uniform 20 cm diameter therapy field are described

  13. Bevalac beam transport system

    International Nuclear Information System (INIS)

    Avery, R.; Behrsing, G.; Morgado, R.; Rondeau, D.; Salsig, W.; Selph, F.; Staples, J.; Yourd, R.

    1975-03-01

    The Bevalac consists of, in part, a 200 meter long transfer line between the SuperHILAC and the Bevatron, which are at differing elevation. Unique features in the construction of the transfer line are described. The line, located largely outside, must cope with a natural environment. Part of the line passes through a hillside, requiring some unique support and alignment techniques. The dipoles are of the tape-wound variety and the steering magnets use printed circuit conductors. The vacuum system and an inexpensive and effective destructive monitoring system are described. (U.S.)

  14. Bevalac Radiotherapy Facility

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, J.R.; Howard, J.; Criswell, T.

    1979-03-01

    Patient Treatment Room at the Bevalac is now in full operation. In the design of this facility, emphasis has been placed on creating an atmosphere appropriate to a clinical facility; the usual features of an irradiation cave have been hidden behind carpets, curtains and paint. Patient positioning is done with a Philips Ram-style couch, with additional fixtures to accommodate a patient in the seated or standing, as well as the supine, position. Dosimetry apparatus, collimators, ion chambers and the beam flattening system used to produce the highly uniform 20 cm diameter therapy field are described.

  15. El movimiento laborista británico y España (1974-1977

    Directory of Open Access Journals (Sweden)

    Pilar Ortuño-Anaya

    1996-01-01

    Full Text Available Son escasos los estudios dedicados por los historiadores a la dimensión internacional de la transición española, esto es, la influencia de los actores externos sobre el proceso de cambio político en España. El trabajo publicado con Charles T. Powell: «La dimensión internacional de la transición española» abre una línea de investigación hasta entonces sin explorar. Gobiernos democráticos. Comunidad Económica Europea, Organizaciones no gubernamentales transnacionales como la Internacional Socialista, partidos y fundaciones políticas... todos ellos contribuyeron sin duda al proceso de cambio político y consolidación democrática en España durante los años setenta. Esta investigación se centra en el papel desempeñado por el movimiento laborista británico durante los años 1974-1977 como factor externo en el apoyo al movimiento socialista en España y al proceso de democratización española. Para ello hemos considerado la actuación del partido laborista, los sindicatos británicos y el gobierno británico que fue laborista desde 1974 hasta 1979.

  16. Radioactive beam production at the Bevalac

    International Nuclear Information System (INIS)

    Alonso, J.R.; Feinberg, B.; Kalnins, J.G.; Krebs, G.F.; McMahan, M.A.; Tanihata, I.

    1989-10-01

    At the Bevalac radioactive beams are routinely produced by the fragmentation process. The effectiveness of this process with respect to the secondary beam's emittance, intensity and energy spread depends critically on the nuclear reaction kinematics and the magnitude of the incident beam energy. When this beam energy significantly exceeds the energies of the nuclear reaction process, many of the qualities of the incident beam can be passed on to the secondary beam. Factors affecting secondary beam quality are discussed along with techniques for isolating and purifying a specific reaction product. The on-going radioactive beam program at the Bevalac is used as an example with applications, present performance and plans for the future. 6 refs., 6 figs., 1 tab

  17. Bevalac user's handbook

    Energy Technology Data Exchange (ETDEWEB)

    1990-04-01

    This report is a users manual on the Bevalac accelerator facility. This paper discuses: general information; the Bevalac and its operation; major facilities and experimental areas; and experimental equipment.

  18. Bevalac Minibeam Facility

    International Nuclear Information System (INIS)

    Schimmerling, W.; Alonso, J.; Morgado, R.; Tobias, C.A.; Grunder, H.; Upham, F.T.; Windsor, A.; Armer, R.A.; Yang, T.C.H.; Gunn, J.T.

    1977-03-01

    The Minibeam Facility is a biomedical heavy-ion beam area at the Bevalac designed to satisfy the following requirements: (1) provide a beam incident in a vertical plane for experiments where a horizontal apparatus significantly increases the convenience of performing an experiment or even determines its feasibility; (2) provide an area that is well shielded with respect to electronic interference so that microvolt signals can be detected with acceptable signal-to-noise ratios; (3) provide a beam of small diameter, typically a few millimeters or less, for various studies of cellular function; and (4) provide a facility for experiments that require long setup and preparation times and apparatus that must be left relatively undisturbed between experiments and that need short periods of beam time. The design of such a facility and its main components is described. In addition to the above criteria, the design was constrained by the desire to have inexpensive, simple devices that work reliably and can be easily upgraded for interfacing to the Biomedical PDP 11/45 computer

  19. Bevatron/Bevalac user's handbook: biology and medicine. Revision

    International Nuclear Information System (INIS)

    1985-04-01

    The Bevalac Biomedical Facility develops a source of near-relativistic heavy ions for applications to radiation biology, radiation therapy and diagnostic radiology. Pulsed beams of high LET heavy ions with variable pulse width, frequency, intensity and energy are produced and delivered to the Biomedical Facility by the Bevatron/Bevalac accelerator complex. Dosimetry equipment under computer control provides accurate determinations of absorbed doses in all regions of the Bragg curve. Depth-dose modifying devices and precise specimen positioning equipment are available. Animal housing and tissue culture facilities are convenient to the experimenter. This handbook is designed to provide the user with the relevant information for planning, proposing and executing an experiment

  20. Synchrotrons for heavy ions: Bevalac experience

    International Nuclear Information System (INIS)

    Grunder, H.A.; Gough, R.A.; Alonso, J.R.

    1980-10-01

    The Bevalac should be viewed not as a model of accelerator hardware - a modern heavy ion complex will look quite different, but as a model for an operating versatile multifaceted, multiuser heavy ion facility. Of value to the planning of a new accelerator such as MARIA is the knowledge of operating modes peculiar to heavy ions and specific hardware requirements to carry out its mission with the mandated flexibility and reliability. This paper starts with a discussion of parameters and machine characteristics most suitable for medical and nuclear science applications. It then covers experience in interleaving these two research programs, and finally, concentrates on accelerator configuratin questions; injectors, repetition rate, vacuum systems and cost criteria which will be relevant to the design of MARIA

  1. Recent results from the Bevalac

    International Nuclear Information System (INIS)

    Pugh, H.G.

    1982-06-01

    In a collision between a 1.8 GeV/amu argon ion and a lead target, the overlapping regions of projectile and target undergo violent interaction while the non-overlapping regions either continue with beam velocity and break up into projectile fragments or remain at rest and break into target fragments. Projectile fragements are the easiest to study; the participants, in the mid-rapidity region, are the next easiest, while the target fragments have not been extensively studied, except by radiochemistry techniques. This talk concentrates (with the exception of a discussion of anomalous projectile fragments) on the participant region, where one would expect to find high densities and temperatures and where evidence of any phase transition might be found. The extensive evidence for a high degree of equilibration at Bevalac energies is omitted, even though the stopping power of nuclei is crucial for possible studies at higher energies

  2. Bevalac injector final stage RF amplifier upgrades

    International Nuclear Information System (INIS)

    Howard, D.; Calvert, J.; Dwinell, R.; Lax, J.; Lindner, A.; Richter, R.; Ridgeway, W.

    1991-01-01

    With the assistance of the DOE In-house Energy Management Program, the Bevalac injector final stage RF amplifier systems have been successfully upgraded to reduce energy consumption and operating costs. This recently completed project removed the energy-inefficient plate voltage modulator circuits that were used in conjunction with the final stage RF amplifiers. Construction, design, and operating parameters are described in detail

  3. High purity radioactive beams at the bevalac

    International Nuclear Information System (INIS)

    Alonso, J.R.; Chatterjee, A.; Tobias, C.A.

    1979-03-01

    Peripheral nuclear fragmentation reactions of primary Bevalac heavy ion beams are used to produce secondary beams of radioactive nuclei. The large cross section and small deflection of the projectile fragments lead to high production and delivery efficiency for these beams. Dispersive beam transport allows good separation and purification of the desired secondary beams. 11 C and 19 Ne beams of high purity and good intensity (almost 0.2% of the primary beam current) are presently being used for biomedical experiments

  4. Heavy ion therapy: Bevalac epoch

    International Nuclear Information System (INIS)

    Castro, J.R.

    1993-10-01

    An overview of heavy ion therapy at the Bevelac complex (SuperHILac linear accelerator + Bevatron) is given. Treatment planning, clinical results with helium ions on the skull base and uveal melanoma, clinical results with high-LET charged particles, neon radiotherapy of prostate cancer, heavy charged particle irradiation for unfavorable soft tissue sarcoma, preliminary results in heavy charged particle irradiation of bone sarcoma, and irradiation of bile duct carcinoma with charged particles and-or photons are all covered

  5. Studies at LBL's Bevalac will help resolve uncertainties about radiation risks to astronauts

    International Nuclear Information System (INIS)

    Kahn, J.

    1991-01-01

    Plans to operate the LBL's Bevalac facility for space research are discussed. The proposed program includes the use of cell cultures and animal models to assess the biological consequences of exposures to different particles that are components of the space radiation environment. Research will also be conducted on measures to counter radiation. Experiments will be carried out to examine how various materials that could be used in a spacecraft wall would alter the cascade of particles that would ultimately reach an astronaut

  6. Dilepton (e+e-) production at Bevalac energies

    International Nuclear Information System (INIS)

    Schroeder, L.S.

    1990-09-01

    The use of dilepton production in p-A and A-A collisions as a probe of nuclear matter under extreme conditions is described. Recent results from the DLS collaboration at the Bevalac are presented. 10 refs., 2 figs

  7. BERKELEY: Farewell to the Bevatron/Bevalac

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Full text: Nearly a hundred current and former Lawrence Berkeley Laboratory employees gathered at the Bevatron accelerator on 21 February to watch Ed Lofgren turn off the beam for the last time. Lofgren, in charge of the venerable machine from its completion in 1954 until his retirement in 1979, pushed a button that someone long ago labeled ''atom smasher offer'', bringing to an end four decades of accomplishment in high energy and heavy ion physics. Owen Chamberlain, who shared the 1959 physics Nobel with Emilio Segré for the discovery of the antiproton at the Bevatron, was among those present at the closing ceremony. The shutdown came 39 years to the week after Bevatron beam first circulated, and a touching moment came just after Lofgren shut the machine down when the poignant strains of the ''Taps'' salute wafted out over the PA system. The Bevatron - or Bevalac, as it was called after being linked to the Super HILAC linear accelerator in the 1970s - made major contributions in four distinct areas of research: high energy physics, heavy ion physics, medical research and therapy, and space-related studies of radiation damage and heavy particles in space. As well as the discovery of the antiproton, the early years of the Bevatron saw classic studies of the kaon, leading to a deeper understanding of both strong and weak interaction physics. With Luis Alvarez' development of Donald Glaser's original bubble chamber idea into a prolific physics technique, the Bevatron was a major focus of the heady days of resonance hunting in the late 1950s and early 1960s. Most recently the Bevalac (Bevatron-SuperHILAC combination) pioneered relativistic heavy ion physics. The central focus of this research programme was the production and study of extreme conditions in nuclear matter. Highlights include the first definitive evidence of collective flow of nuclear matter at high temperatures and densities, studies of the nuclear

  8. Bevalac versatility: Operations achievements in the multi-tasking mode

    International Nuclear Information System (INIS)

    Lothrop, F.; Alonso, J.; Miller, R.; Tekawa, M.

    1989-03-01

    Demand for relativistic heavy ion beams at the Bevalac has increased dramatically in the past two years. To keep pace, the Bevalac make use of five injectors, precise guide field control, preset beam transport line tunes, nine nuclear science target areas, and three biology/radiotherapy areas, along with elegant control computer algorithms, to achieve high operating efficiency. Routine operation includes as many as ten ion/energy/beamline changes per day, 15 major nuclear science experiments each year, radiotherapy on nearly a daily basis, with biology experiments operating biweekly. High operating efficiency and low failure rates combine to produce high annual research hours. 12 refs., 2 figs

  9. First results on dilepton production at the Bevalac

    International Nuclear Information System (INIS)

    Roche, G.; Claesson, G.; Hendrie, D.

    1987-12-01

    We report on preliminary results of direct electron pair measurements in p+Be at 4.9 GeV and 2.1 GeV and Ca+Ca at 1.95 GeVA collisions at the Bevalac. The results are compared to existing data in p+Be at 12.1 GeV and π - p at 15.9 and 16.9 GeV

  10. Design of a pulsed switching magnet for the Bevalac

    International Nuclear Information System (INIS)

    Abbott, S.; Alonso, J.; Brown, J.; Kalnins, J.; Krebs, G.; Reimers, R.

    1989-03-01

    The design and construction of a water cooled, pulsed, laminated core dipole magnet which has recently been installed at the Bevalac is described. This new, energy efficient magnet was funded by the DOE In-House Energy Management Program. The magnet has been specifically designed for maximum efficiency in power utilization and has replaced two dc powered magnets in the Bevalac switchyard. It will reduce energy usage by 747 MWh/yr, and it provides the capability of pulse-to-pulse switching in 0.7 seconds between two major beamline channels serving the nuclear science and radiotherapy programs at the /Bevalac. A unique feature of this magnet is the core design which utilizes an external structure that remains integral with the core laminations after assembly. The structure provides for both torsional and longitudinal rigidity of the core while also facilitating the precision assembly and compression of the core laminations without the use of special assembly fixtures. 2 refs., 4 figs., 1 tab

  11. Equipment proposal for Bevalac experiments. Final technical report

    International Nuclear Information System (INIS)

    Brady, F.P.; Romero, J.L.

    1983-01-01

    A large Multiple Sampling Ionization Chamber (MUSIC) has been developed as a part of the Heavy Ion Spectrometer System (HISS). This facility is being used for the study of relativistic nuclear collisions at the Bevalac of Lawrence Berkeley Laboratory. We have measured for MUSIC a single event resolution of 15% for Fe beam and a charge resolution better than 0.5 units of charge for a Ne beam. These results indicate that a charge resolution of one unit from Z = 7 to Z = 100 should be achieved with the present detector

  12. Beam profile monitor system for the bevalac transfer line

    International Nuclear Information System (INIS)

    Stover, G.

    1985-01-01

    Incorporated in the current Bevalac transfer line upgrade project is a proposal for a new electronic beam monitoring system. It will be designed to amplify, convert, and transmit the signals of twelve 16 by 16 multi-wire grids to a central computer located in the Bevatron control room. Each station will contain interface amplifiers and a local microprocessor to convert wire grid currents into digitized values which will then be transmitted via a serial data channel to the main computer. The system will have a large dynamic range (1 nano to 1 milli-ampere of beam current), be designed for distributed operation, and will be easily expandable. This paper describes the basic electronic hardware and software components of the proposed system

  13. Relativistic nucleus-nucleus collisions: from the BEVALAC to RHIC

    International Nuclear Information System (INIS)

    Stock, Reinhard

    2004-01-01

    I briefly describe the initial goals of relativistic nuclear collision research, focusing on the LBL Bevatron/Bevalac facility in the 1970s. An early concept of high hadronic density fireball formation, and subsequent isentropic decay (preserving information of the high-density stage), led to an outline of physics observables that could determine the nuclear matter equation of state at several times the nuclear ground state matter density. With the advent of QCD the goal of locating and characterizing the hadron-parton deconfinement phase transformation suggested the need for higher √s, the research thus shifting to the BNL AGS and CERN SPS, and finally to RHIC at BNL. A set of physics observables is discussed where present data span the entire √s domain, from Bevalac and SIS at GSI, to high RHIC energy. Referring, selectively, to data concerning bulk hadron production, the overall √s evolution of directed and radial flow observables, and of pion pair Bose-Einstein correlation is discussed. The hadronization process is studied in the grand canonical statistical model. The resulting hadronization points in the plane T versus μ B converge onto the parton-hadron phase boundary predicted by finite μ B lattice QCD, from high SPS to RHIC energy. At lower SPS and high AGS energy a steep strangeness maximum occurs at which the Wroblewski parameter λ s ∼ 0.6; a possible connection to the QCD critical point is discussed. Finally the unique new RHIC physics is addressed: high-p T hadron suppression and jet 'tomography'

  14. A proposal to pulse the Bevatron/Bevalac main guide field magnet with SCR power supplies

    International Nuclear Information System (INIS)

    Frias, B.; Alonso, J.; Dwinell, R.; Lothrop, F.

    1989-01-01

    The Bevatron/Bevalac Main Guide Field Power Supply was originally designed to provide a 15,250 Volt DC. at sign 8400 Ampere peak magnet pulse. Protons were accelerated to 6.2 Gev. The 128 Megawatt (MW) pulse required two large motor-generator (MG) sets with 67 ton flywheels to store 680 Megajoules of energy. Ignitron rectifiers are used to rectify the generator outputs. Acceleration of heavy ions results in an operating schedule with a broad range of peak fields. The maximum field of 12.5 kilogauss requires a peak pulse of 80 MW. Acceleration of ions to 1.0 kilogauss requires an 8 MW peak pulse. One MG set can provide pulses below 45 MW. Peak pulses of less than 15 MW are now a large block of the operating schedule. A proposal has been made to replace the existing MG system with eight SCR power supplies for low field operation. The SCR supplies will be powered directly from the Lawrence Berkeley Laboratory's 12.3 KV. power distribution system. This paper describes the many advantages of the plan. 4 refs., 3 figs., 3 tabs

  15. Operating results for the beam profile monitor system currently in use at Bevalac Facility

    International Nuclear Information System (INIS)

    Stover, G.; Fowler, K.

    1987-03-01

    Three stations of a soon to be completed multi-station, multi-wire beam monitoring system have been installed in the Bevalac transfer line. The following article will provide a cursory analysis of the electronic circuitry, discuss new design additions and summarize the operating results obtained over the last year

  16. Collective flow and azimuthal correlations in nucleus-nucleus collisions at the Bevalac

    International Nuclear Information System (INIS)

    Rai, G.

    1993-09-01

    The EOS experiment at the Bevalac has recently carried out exclusive event-by-event measurements of relativistic heavy ion collisions with a variety of projectile, target and beam energy combinations. The data was obtained using the EOS Time Projection Chamber. We present preliminary results on inclusive spectra, collective flow and azimuthal correlations obtained from a study of Au + Au reactions with beam energies covering 0.6 - 1.2 A GeV

  17. Workshop summary. Biomedical and Space-Related Research with Heavy Ions at the BEVALAC

    Science.gov (United States)

    Schimmerling, W.; Curtis, S. B.

    1989-01-01

    The authors provide an overview of papers presented at a workshop on Biomedical and Space-Related Research with Heavy Ions at the BEVALAC at Lawrence Berkeley Laboratory. Goals of the meeting were to determine the critical experiments using heavy ions as probes in radiation physics, radiation chemistry, macromolecular and cellular biology, evolution science, basic neurophysiology, and medical therapies; how beam lines and facilities at Lawrence Berkeley Laboratory can be improved for these experiments; and implications in priorities and funding for national policy. Workshop topics included physics and facilities, cellular and molecular biology, tissue radiobiology, and the future of heavy ion research.

  18. Relativistic nuclear collisions from the EOS experiment at the Bevalac: collective observables and multifragmentation

    International Nuclear Information System (INIS)

    Insolia, A.

    1996-01-01

    The EOS Collaborations has completed an exclusive study of relativistic heavy ion collisions at the Bevalac using a variety of projectile, target and beam energy combinations. We report here results on directed sidewards flow in Au+Au between 0.25 AGeV and 1.2 AGeV, using a standard in-plane transverse momentum analysis. We also report on projectile fragmentation of Au in C at 1 AGeV. An analysis of fluctuations and critical exponents for small systems seems to support the idea that the multifragmentation regime is associated with a liquid gas phase transition in nuclear matter. (authors)

  19. Progress in collective flow studies from the onset to Bevalac/SIS

    International Nuclear Information System (INIS)

    Lisa, M.A.

    1995-03-01

    Collective flow in heavy ion collisions was first observed experimentally more than a decade ago at the Bevalac by the Plastic Ball collaboration. Although early calculations had suggested that measurement of the flow would place tight constraints on the nuclear equation of state, uncertainties in other input parameters of microscopic models, which also affect the flow, led to large ambiguities in the equation of state. This talk will discuss recent flow studies that attempt to overcome these difficulties. The EOS and FOPI experiments at the Bevalac and SIS accelerators have measured flow in the 200--2000 A-MeV bombarding energy range with better acceptance, particle identification, and systematics than was previously available. Meanwhile, programs at MSU and GANIL are studying the disappearance of flow around 50 A-MeV. Systematic comparison of these data with predictions of microscopic models is beginning to reduce the ambiguities in the extraction of physics quantities. Also, new directions in flow studies, such as the flow of produced particles and radial flow, offer the possibility of further information from flow studies. Recent accomplishments and new directions in flow studies are discussed, and areas where further study is needed are pointed out

  20. The scintillating optical fiber isotope experiment: Bevalac calibrations of test models

    International Nuclear Information System (INIS)

    Connell, J.J.; Binns, W.R.; Dowkontt, P.F.; Epstein, J.W.; Israel, M.H.; Klarmann, J.; Washington Univ., St. Louis, MO; Webber, W.R.; Kish, J.C.

    1990-01-01

    The Scintillating Optical Fiber Isotope Experiment (SOFIE) is a Cherenkov dE/dx-range experiment being developed to study the isotopic composition of cosmic rays in the iron region with sufficient resolution to resolve isotopes separated by one mass unit at iron. This instrument images stopping particles with a block of scintillating optical fibers coupled to an image intensified video camera. From the digitized video data the trajectory and range of particles stopping in the fiber bundle can be determined; this information, together with a Cherenkov measurement, is used to determine mass. To facilitate this determination, a new Cherenkov response equation was derived for heavy ions at energies near threshold in thick Cherenkov radiators. Test models of SOFIE were calibrated at the Lawrence Berkeley Laboratory's Bevalac heavy ion accelerator in 1985 and 1986 using beams of iron nuclei with energies of 465 to 515 MeV/nucleon. This paper presents the results of these calibrations and discusses the design of the SOFIE Bevalac test models in the context of the scientific objectives of the eventual balloon experiment. The test models show a mass resolution of σ A ≅0.30 amu and a range resolution of σ R ≅250 μm. These results are sufficient for a successful cosmic ray isotope experiment, thus demonstrating the feasibility of the detector system. The SOFIE test models represent the first successful application in the field of cosmic ray astrophysics of the emerging technology of scintillating optical fibers. (orig.)

  1. Comparative Animal Research Laboratory. Progress report, 1974--1977

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-01

    Separate abstracts were prepared for three sections of the report. The publication also includes an organizational chart, financial data, and a section on facilities construction and improvement. (HLW)

  2. Bevalac, a high-energy heavy-ion facility: status and outlook

    International Nuclear Information System (INIS)

    Grunder, H.A.

    1974-01-01

    The high-energy heavy-ion facility, which has commonly been referred to as the Bevalac, is a synchrotron with B rho of 9000 [kG-in or 2.3 x 10 2 kG-m] having special injectors. The synchrotron has three injectors. The 50 MeV proton injector, originally from BNL, is a tool left over from the high-energy high-intensity days of this productive synchrotron. The 20 MeV linac is a proton linac, designed so conservatively that it was possible to accelerate modest but useful beams of 12 C, 14 N, and 16 O as well as deuterons and alpha particles in the 2 β lambda mode. This was accomplished in 1971. After our first trials, a suggestion made earlier by A. Ghiorso to inject from the SuperHILAC into the synchrotron was actively pursued. Reasons as to why the SuperHILAC is being used as injector to the Bevatron are given

  3. Metallic wedge degraders for rapid energy measurement of Bevalac heavy ion beams

    Energy Technology Data Exchange (ETDEWEB)

    Wada, R.; Alonso, J.R.

    1981-03-01

    An ever-present need in an accelerator-based research program is knowing the energy of the beam delivered to the experimenter. Knowledge of accelerator parameters is generally good enough to predict the beam energy to within a few percent as it leaves the machine, but after passage through a complex switchyard, with air gaps, and non-destructive monitors, substantial changes in the energy can occur. Knowledge of the material in the beam path allows for calculations of expected energy loss, but this knowledge is not always complete, and the unforeseen often plays tricks on the unwary experimenter; for example, a section of beam-pipe inadvertently let up to air, or a monitor left in the beam-line from the previous run. Although such occurrences are rare, to say they do not happen would be grossly inaccurate. The only defense of the experimenter, then, is to have an accurate technique for determining the beam energy at his target location, a technique which requires little beam time and which is non-disruptive of his experimental setup. The device described meets all of these criteria, and is now used extensively in the Nuclear Science and Biomedical programs at the Bevalac.

  4. Metallic wedge degraders for rapid energy measurement of Bevalac heavy ion beams

    International Nuclear Information System (INIS)

    Wada, R.; Alonso, J.R.

    1981-03-01

    An ever-present need in an accelerator-based research program is knowing the energy of the beam delivered to the experimenter. Knowledge of accelerator parameters is generally good enough to predict the beam energy to within a few percent as it leaves the machine, but after passage through a complex switchyard, with air gaps, and non-destructive monitors, substantial changes in the energy can occur. Knowledge of the material in the beam path allows for calculations of expected energy loss, but this knowledge is not always complete, and the unforeseen often plays tricks on the unwary experimenter; for example, a section of beam-pipe inadvertently let up to air, or a monitor left in the beam-line from the previous run. Although such occurrences are rare, to say they do not happen would be grossly inaccurate. The only defense of the experimenter, then, is to have an accurate technique for determining the beam energy at his target location, a technique which requires little beam time and which is non-disruptive of his experimental setup. The device described meets all of these criteria, and is now used extensively in the Nuclear Science and Biomedical programs at the Bevalac

  5. Light-ion therapy in the US: From the Bevalac to ??

    International Nuclear Information System (INIS)

    Alonso, Jose R.; Castro, Joseph R.

    2002-01-01

    While working with E.O. Lawrence at Berkeley, R.R. Wilson in 1946 noted the potential for using the Bragg-peak of protons (or heavier ions) for radiation therapy. Thus began the long history of contributions from Berkeley to this field. Pioneering work by C.A. Tobias et al at the 184-Inch Synchrocyclotron led ultimately to clinical applications of proton and helium beams, with over 1000 patients treated through 1974 with high-energy plateau radiation; placing the treatment volume (mostly pituitary fields) at the rotational center of a sophisticated patient positioner. In 1974 the SuperHILAC and Bevatron accelerators at the Lawrence Berkeley Laboratory were joined by the construction of a 250-meter transfer line, forming the Bevalac, a facility capable of accelerating ions of any atomic species to relativistic energies. With the advent of these new beams, and better diagnostic tools capable of more precise definition of tumor volume and determination of the stopping point of charged-particle beams, large-field Bragg-peak therapy with ion beams became a real possibility. A dedicated Biomedical experimental area was developed, ultimately consisting of three distinct irradiation stations; two dedicated to therapy and one to radiobiology and biophysics. These facilities included dedicated support areas for patient setup and staging of animal and cell samples, and a central control area linked to the main Bevatron control room

  6. Design of the Bevalac heavy ion spectrometer system and its performance in studying /sup 12/C fragmentation

    Energy Technology Data Exchange (ETDEWEB)

    Engelage, J; Crawford, H J; Flores, I; Baumgartner, M E; Beleal, E; Bieser, F; Bronson, M; Greiner, D E; Greiner, L; Lindstrom, P J

    1989-05-01

    A description is given of the design and operation of the Heavy Ion Spectrometer System (HISS) at the Lawrence Berkeley Laboratory Bevalac. The general characteristics of the apparatus, which include a large superconducting magnet with drift chambers before and after for precise angle and momentum analysis of high multiplicity events and a large scintillation array for charge and velocity measurements, are explained. The performance of each part as measured in a /sup 12/C fragmentation experiment is discussed in detail. The main feature of the data-acquisition and apparatus-monitoring systems and of the off-line event reconstruction are given.

  7. Study of radiative effects in 1.8 GeV/n 40Ar incident on Pb (Bevalac Experiment E486H)

    International Nuclear Information System (INIS)

    Hallman, T.; McIntyre, E.; Madansky, L.; Carroll, J.; Mulera, T.; Sagle, A.; Koontz, R.; Roche, G.; Schroeder, L.

    1981-01-01

    The experimental setup, instrumentation, and results of Experiment 486H at Bevalac to test the feasibility of studying two photon inclusive and inclusive lepton pair production in the presence of a high multiplicity of background secondaries are described. Some preliminary observations are discussed

  8. General program of energy research: innovation in hard coal, 1974-1977. New drivage systems. Rahmenprogramm energieforschung: innovation steinkohle, 1974-1977. Neue vortriebssysteme. Volume 1, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    During the four year period of the program, initiated by the German Federal government, 19 research and machine development projects in the field of road heading machines were subsidized. The Juelich energy research project management oversaw the progress of the programs. Projects for developing new machines at a total cost of 0.1 to 3.2 million DM per project were subsidized by 50%. The developed machinery includes the Roboter, WAV 200 and AM 50 high powered road cutter loaders, HSV 4 and Hausherr Mini ripper hydraulic percussion hammer heading machines, the DEMAG/SVM full face tunneling machine with a cutting head of 6 m in diameter, efficient drilling and blasting equipment for road drivage in rock and mechanized systems for achieving efficient support work, and keeping pace with the speed of mine drivage.

  9. General programme of energy research: innovation in hard coal, 1974-1977. Preparation and surface facilities. Rahmenprogramm Energieforschung: Innovation Steinkohle, 1974-1977. Aufbereitung und Tagesanlagen)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Under the program Preparation and Surface Facilities initiated by the Federal Ministry of Economy of the FRG financial support in the amount of 50% (approx. 17 million DM) of the total project costs was allocated to eight applicants from the mining industry. The Ministry subsidized 15 research projects in the field of coal preparation and handling dealing with: surface blending and storage facilities; the development of a solid bowl centrifuge, steam cowl filter, and reciprocating centrifuge for dewatering coal fines; development of a jig and a screen sizer for coal sizing; clarification units and combustion of waste slurries in a fluidized-bed furnace; computerized monitoring of coal flow in surface and underground installations; the development of a conception for preparing coal otherwise difficult to prepare; and the development of the Olifloc method for agglomeration of coal fines sludge and separation from tailings. (In German)

  10. The Bevalac accelerator

    International Nuclear Information System (INIS)

    Dacal, A.

    1989-01-01

    Presented are the characteristics of the Bevatron and SuperHilac heavy ion accelerators in a very general manner. Some aspects of their application in the field of biological medicine and some of the interesting results obtained in experiments on nuclear physics are mentioned. (Author). 20 refs, 2 figs, 2 tabs

  11. Manual for the application of NURE 1974--1977 aerial gamma-ray spectrometer data

    International Nuclear Information System (INIS)

    Saunders, D.F.; Potts, M.J.

    1977-09-01

    This manual was prepared as an aid to those interested in the interpretation and application of high-sensitivity aerial gamma-ray spectrometer data in uranium exploration. Particular emphasis is on the first 10 radiometric surveys performed under the National Uranium Resource Evaluation (NURE) program. The primary purpose of aerial gamma-ray spectrometer surveys in the NURE program is to map regional distributions of near-surface natural radioelements, i.e., the uranium and thorium decay series, and potassium-40. These data along with an understanding of the geochemical behavior of the pertinent isotopes under a variety of conditions allow uranium-enriched areas of the earth's crust (uraniferous provinces) to be identified as part of the regional appraisal phase of prospecting. Uranium ore deposits tend to occur more frequently in these generally enriched regions than elsewhere, and, consequently, uraniferous provinces constitute preferred territory for follow-up exploration methods such as detailed aerial or surface radiometric prospecting, geological studies, etc., to define potential prospects. These in turn may be investigated by still more detailed surface geological studies perhaps supplemented by radon or uranium geochemical surveys and exploration drilling and logging. This manual outlines the fundamentals of uranium geology and geochemistry along with interpretive approaches which may be used to identify statistically and geochemically significant uranium anomalies and uraniferous provinces. Follow-up prospecting methods are summarized along with guides to recent literature. Specific suggestions are made as to interpretive approaches and applicable follow-up prospecting procedures tailored to fit the data characteristics and general environment of each of the first 10 NURE aerial gamma-ray spectrometer surveys performed by Geodata International, Inc. and Texas Instruments Incorporated

  12. Proteins in growth regulation during early development. Comprehensive three year report, 1974--1977

    Energy Technology Data Exchange (ETDEWEB)

    Klein, N.W.

    1977-08-01

    Progress is reported on the following research projects: response of embryo regions to nutrition; synthesis of serum proteins by the yolk-sac; serum protein synthesis in relation to protein nutrition, protease secretion, teratogenic agents, genetic abnormalities, yolk-sac cell cultures, and cell free systems; and effects of serum proteins on rat embryos, chick embryos without yolk-sacs, and isolated brains. (HLW)

  13. The Portuguese Literacy Campaigns after the Carnation Revolution (1974-1977)

    Science.gov (United States)

    Gomes, Isabel Pereira; Amorim, José Pedro; Correia, José Alberto; Menezes, Isabel

    2015-01-01

    This article presents a description of the major campaigns of adult literacy in the revolutionary period in Portugal, between the years 1974 and 1977. The campaigns aimed to address the problem of extremely low levels of formal education and high levels of adult illiteracy, and were organized by different movements, from the military to political…

  14. Radioactivity in soils and sediments in and adjacent to the Los Alamos area, 1974-1977

    International Nuclear Information System (INIS)

    Purtymun, W.D.; Peters, R.J.; Stoker, A.K.

    1980-02-01

    Soils and sediments are analyzed for gross alpha, gross beta, 238 Pu, 239 Pu, 137 Cs, 90 Sr, and total uranium as part of the continuing Environmental Monitoring Program at the Los Alamos Scientific Laboratory. This report documents the levels of radioactivity of radionuclides in soils and sediments in northern New Mexico from natural sources and worldwide fallout as well as at seven on-site soil and sediment stations which contain radioactivity contributed by the Laboratory for the period 1974 through 1977

  15. Prying the Gates Wide Open: Academic Freedom and Gender Equality at Brown University, 1974-1977

    Science.gov (United States)

    Porwancher, Andrew

    2013-01-01

    In 1974, Brown University's Department of Anthropology denied tenure to assistant professor Louise Lamphere. Convinced that her dismissal was the product of sex discrimination, Lamphere filed suit against Brown. Lamphere and three other female scholars who joined her suit successfully pressed Brown into an out-of-court settlement in 1977.…

  16. The Portuguese Literacy Campaigns After the Carnation Revolution (1974-1977

    Directory of Open Access Journals (Sweden)

    Isabel Pereira Gomes

    2015-05-01

    Full Text Available This article presents a description of the major campaigns of adult literacy in the revolutionary period in Portugal, between the years 1974 and 1977. The campaigns aimed to address the problem of extremely low levels of formal education and high levels of adult illiteracy, and were organized by different movements, from the military to political youth organizations. In all cases, Paulo Freire’s theory and methods were an important reference to these initiatives of popular education even if, in some cases, these were clearly top-down approaches, while others advocated a bottom-up perspective. We will start by an analysis of the rationale of these movements based on documents produced at the period and a literature review. Then, retrospective interviews with two women participating in these campaigns are used to illustrate these experiences and their perceived impact on themselves and the adults involved. Not surprisingly, the impact of these literacy campaigns is perceived as significant both for the population, particularly older women, but mainly for the young literacy mediators who seem to have experienced this as a life-changing event. Even though this is a preliminary stage of the research, results suggest the significance of gender inequality and poverty as markers in the lived experience of these campaigns, and the high levels of hope and political mobilization of the young people involved, even with various degrees of ideological commitment. Cet article présente une description de grandes campagnes d'alphabétisation des adultes dans la période révolutionnaire au Portugal, entre les années 1974 et 1977. Les campagnes visaient à régler le problème des très faibles niveaux d'éducation formelle et des niveaux élevés d'analphabétisme des adultes et ont été organisées par différents mouvements, de l'armée à des organisations politiques de jeunesse. Dans tous les cas, la théorie et les méthodes de Paulo Freire ont été une référence importante pour ces initiatives d'éducation populaire même si, dans certains cas, ces approches ont été clairement de haut en bas, tandis que d'autres plaidé pour une perspective de bas en haut. Nous allons commencer par une analyse de la justification de ces mouvements fondés sur les documents produits à la période et une revue de la littérature. Ensuite, des entretiens rétrospectifs avec deux femmes participant à ces campagnes servent à illustrer ces expériences et leurs répercussions perçues sur eux-mêmes et les adultes impliqués. Sans surprise, l'impact de ces campagnes d'alphabétisation est perçue comme importante tant pour la population, les femmes âgées en particulier, mais surtout pour les jeunes médiateurs de l'alphabétisation qui semblent avoir fait de cette expérience comme un événement qui change la vie. Même s'il s'agit d'une étape préliminaire de la recherche, les résultats suggèrent l'importance des inégalités entre les sexes et la pauvreté comme marqueurs dans l'expérience vécue de ces campagnes et les niveaux élevés d'espoir et de mobilisation politique des jeunes impliqués, même avec divers degrés d'engagement idéologique.

  17. Physico-chemical study of some areas of fundamental significance to biophysics. Final report, 1974--1977

    Energy Technology Data Exchange (ETDEWEB)

    McGlynn, S.P.

    1977-08-18

    The comprehensive report includes a complete list of publications resulting from the work and a review of studies made in the vacuum ultraviolet, photoelectron spectroscopy, excited states and electron structure of inorganic salts, a model for polar molecules, application of abstract mathematics to the genetic code, the orbital approximation in which orbital properties are related to state properties. (JSR)

  18. Physico-chemical study of some areas of fundamental significance to biophysics. Final report, 1974--1977

    International Nuclear Information System (INIS)

    McGlynn, S.P.

    1977-01-01

    The comprehensive report includes a complete list of publications resulting from the work and a review of studies made in the vacuum ultraviolet, photoelectron spectroscopy, excited states and electron structure of inorganic salts, a model for polar molecules, application of abstract mathematics to the genetic code, the orbital approximation in which orbital properties are related to state properties

  19. Charge-exchange products of BEVALAC projectiles

    International Nuclear Information System (INIS)

    Rasmussen, J.

    1982-11-01

    There is a substantial production of fragments of all masses lighter than the projectile, such fragments being centered in a narrow region of velocity space around the beam velocity. The exciting studies about anomalons deal with the curious enhanced reactivity of some of these secondary fragments. I direct attention here to the rather rare fragments of the same mass number as the projectile but differing in charge by one unit. We also keep track, as a frame of reference, of the products that have lost one neutron from the projectile

  20. Bevalac operations update: Pub. 496, No. 5

    International Nuclear Information System (INIS)

    1989-03-01

    This report contains information on the following experiments: Beam 30-1 (Dilepton Spectrometer); Beam 30-2 (Janus Spectrometer); Beam 39 I Low Energy Program; Beam 39 II Irradiation Station; Beam 39 III Irradiation Station; Beam 40 I RTE; Beam 40 II NASA; Beam 42 I EOS; Beam 42 II Radioactive Beams-Nuclear Radii; Beam 42 III Fragmentation; Beam 42 IV TPC; Beam 42 V Time of Flight Wall; Beam 44 I Low Energy Program; Beam 44 II Radioactive Beams-Magnetic Moments; Beam 44 III Antiprotons; AIP 86-Uranium Intensity; AIP 87-SHILAC Drift Tubes; AIP 88-Computer Control Upgrade I; AIP 89-Computer Control Upgrade II; AIP 90-External Particle Beam Lines Control; AIP 91-Power Supplies; BEVAX Developments; Spiller Control; and, New Pulsed Switching Magnet. 20 figs

  1. Di-leptons at the Bevalac

    International Nuclear Information System (INIS)

    Matis, H.S.

    1988-03-01

    Recent results on the production of di-leptons measured by the Di-Lepton-Spectrometer (DLS) collaboration are discussed. Results are reported from observations made on p /plus/ Be collisions with proton beams from 1.0 to 4.9 GeV and on Ca collisions with calcium beams of 1.0 to 2.0 GeV/A. The shape of the distributions are similar to that at higher energies. The low mass cross section appears to be explained by π-π annihilation, but detailed calculations are needed to substantiate that hypothesis

  2. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  3. Asbestos: a perspective. I. An overview. II. An annotated literature collection, 1960--1974. III. A literature compilation, 1974--1977. [Health hazards

    Energy Technology Data Exchange (ETDEWEB)

    Huff, J.E.; Hammons, A.S.; Dinger, C.Y.; Kline, B.W.; Whitfield, B.L.; Black, S.A.

    1978-03-01

    Although the general population is widely exposed to asbestos, both by inhalation and ingestion, the hazards of chronic, environmental exposure have not been determined. Reasons conflict but are attributed in part to a paucity of information on human dose response, effects of asbestos ingestion, ambient concentrations and distribution of asbestos in the environment, the environmental cycling of asbestos, and related biological interactions including transmission through foodchains. As distilled from the world's asbestos literature, conclusions representing a majority opinion on the pathological effects of asbestos on man are summarized. (38 references.)

  4. Plan well, plan often

    Science.gov (United States)

    Bill Block

    2013-01-01

    This issue includes an invited paper by Courtney Schultz and her colleagues commenting on the application of the newly adopted U.S. Forest Service Planning Rule (hereafter, the rule) for wildlife. The rule is basically implementing language to interpret the spirit and intent of the National Forest Management Act (NFMA) of 1976. Laws such as NFMA require additional...

  5. Language Planning: Corpus Planning.

    Science.gov (United States)

    Baldauf, Richard B., Jr.

    1989-01-01

    Focuses on the historical and sociolinguistic studies that illuminate corpus planning processes. These processes are broken down and discussed under two categories: those related to the establishment of norms, referred to as codification, and those related to the extension of the linguistic functions of language, referred to as elaboration. (60…

  6. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  7. A history of central collisions at the Bevalac

    International Nuclear Information System (INIS)

    Poskanzer, A.M.

    1989-07-01

    You have heard a great deal about Plastic Ball results at this conference. There were talks on the first morning by Hans-Georg Ritter and Karl-Heinz Kampert on the Plastic Ball at Berkeley, there will be a talk next week by Rudi Schmidt on the Plastic Ball at CERN, and many other speakers have mentioned Plastic Ball results. The young students may think that when the new field of relativistic heavy ion physics opened up, an ideal detector was designed and built, data immediately analyzed, and results produced. The theme of my talk is to show that this is incorrect. The experiments proceeded in logical stages, one building upon the other, increasing in complexity and sophistication. The analysis techniques and the theory developed along with the experiments. If the more senior people in the audience easily remember this history of the development of the relativistic heavy ion field, they may spend their time during this talk thinking about what is happening now and what will happen in the future in the ultrarelativistic heavy ion field, where I believe history is repeating itself. 18 refs., 18 figs

  8. From the Bevalac to RHIC: Recent results and future perspectives

    International Nuclear Information System (INIS)

    Harris, J.W.

    1992-09-01

    There has been considerable theoretical progress and experimental development in the study of relativistic nucleus-nucleus collisions towards understanding the equation of state of nuclear, hadronic and partonic matter. At high energies, research has concentrated on the search for the quark-gluon plasma (QGP) and possible chiral symmetry restoration. In these lectures I comment on similarities and trends observed in recent results over a wide range of incident energies and attempt to provide a common framework where possible. I also point out future perspectives in the search for the QGP at the Relativistic Heavy Ion Collider (RHIC), and in Particular focus on one experiment to be undertaken

  9. Heavy ion physics challenges at Bevalac/SIS energies

    Energy Technology Data Exchange (ETDEWEB)

    Gyulassy, M.

    1987-11-01

    This paper discusses where the future of higher energy heavy ion acceleration may lead in terms of understanding the nucleus. The discussion concerns obstacles to formulating an equation of state for nuclear matter at high temperature and density. Implications of this research for astrophysical problems is also presented. (LSP)

  10. Forward planning

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    By definition, forward planning is a process where input consists of conditions on beam configurations and parameters and output consists of dose distributions on target and critical structures, in contrast to inverse planning, where the opposite is true. For forward planning IMRT, criteria are as follows: (i) Plans created as an extension of standard 3D conformational planning; (ii) No significant increase in the complexity of the treatment planning or treatment delivery process; (3) Treatment verification using standard QA procedures; and process consists of the following steps: (i) Create a standard 3D conformational treatment plan; (ii) Copy one of the existing beams; (iii) Create control points: design new beam segments, blocking high dose areas; (iv) Repeat for all beams; (v) Re-compute dose; and (vi) Adjust control points weights to achieve desired dose distribution. A detailed exposition, with many clinical examples, is given for the breast, lung, and brain (P.A.)

  11. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  12. Communication Planning.

    Science.gov (United States)

    Development Communication Report, 1978

    1978-01-01

    Communication planning in developing countries is discussed in individual articles on theory, knowledge production and utilization, planning at the regional level, software, and rural development. A nutrition education project and three experiments in developing educational materials with feedback from villagers in Africa are described in the…

  13. Conference Planning.

    Science.gov (United States)

    Carter, Richard

    1982-01-01

    Presents an overview of the management planning technique known as Break Even Analysis and outlines its use as a tool in financial planning for organizations intending to conduct or sponsor a conference, seminar, or workshop. Three figures illustrating Break Even Analysis concepts and a Break Even Analysis worksheet are included. (JL)

  14. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  15. General program of energy research: innovation in hard coal, 1974-1977. New logistical systems. Volume 2. Rahmenprogramm energieforschung: innovation steinkohle, 1976-1977. Neue logistische systeme. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The Federal Ministry of Economy subsidized 22 research and development projects in the field of new logistic systems in underground coal mines. The Juelich energy research project management, as the representative of the ministry, examined and endorsed all projects before the financial aid of 50% of the total project cost was granted. The 22 projects included development of the following underground equipment: electrical motor brakes for belt conveyors, automatic operation of underground locomotive transportation, protected batteries for use in firedamp conditions, rack wheel drives for the rack rail train and suspended monorail trolley, electrical equipment for 10 kV power supply, flame proof electrical switches, capacitors, circuit breakers, transformers and vacuum contactors,a chair lift system for personnel transportation, and also computerized monitoring systems in the field of mine operation and mine safety.

  16. Marketing plan

    OpenAIRE

    Jantunen, Essi; Hellman, Annika

    2012-01-01

    The aim of this bachelor’s thesis was to draw up an efficient marketing plan for Pohjolan Vihreä Polku Oy, which offers meeting and nature activity services. The company was in a process of conversion and needed a structured marketing plan. The objectives of the company were perceived through severe research. The main purposes of the marketing plan were to raise the visibility of the company and increase its clientele. The proposed marketing actions are also to be used to improve the company’...

  17. Ontological Planning

    Directory of Open Access Journals (Sweden)

    Ahmet Alkan

    2017-12-01

    • Is it possible to redefine ontology within the hierarchical structure of planning? We are going to seek answers to some of these questions within the limited scope of this paper and we are going to offer the rest for discussion by just asking them. In light of these assessments, drawing attention, based on ontological knowledge relying on the wholeness of universe, to the question, on macro level planning, of whether or not the ontological realities of man, energy and movements of thinking can provide macro data for planning on a universal level as important factors affecting mankind will be one of the limited objectives of the paper.

  18. Planning ahead

    Energy Technology Data Exchange (ETDEWEB)

    Davies, J. [Mintec Inc. (US)

    2004-09-01

    The paper presents a state-of-the-art mine planning program that facilitates data storage and provides easy access to essential mine information. MineSight from Mintec, Inc., and the addition MineSight 3D provide a powerful tool used by major coal companies worldwide, offering modelling of different deposit types and complete planning tools including advanced surface/surface and solid/surface intersection routines. The new MineSight Operations addition helps to streamline the planning process and store raw blasthole data (in acQuire) and essential cut attribute information. 12 figs.

  19. Planning Meals

    Science.gov (United States)

    ... Take the guess work out of what to eat using our tips, recipes and sample meals. Featured Book: Ultimate Diabetes Meal Planner includes weekly plans for breakfast, lunch, dinner, and snacks, along with detailed recipes that make ...

  20. Education plan

    International Nuclear Information System (INIS)

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  1. business plan

    OpenAIRE

    Luzan, Dmitrij

    2009-01-01

    My thesis is dedicated to the business plan of the gastronomic facility. The thesis describes foundation of the company, analyses demand for the gastronomic services. The financial plan is being presented as well. The thesis includes the analysis of the company's environment, suppliers and customers. SWOT analysis, net present value analysis, index of the net present value and other ratio indexes are the parts of this thesis.

  2. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  3. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  4. Flight Planning

    Science.gov (United States)

    1991-01-01

    Seagull Technology, Inc., Sunnyvale, CA, produced a computer program under a Langley Research Center Small Business Innovation Research (SBIR) grant called STAFPLAN (Seagull Technology Advanced Flight Plan) that plans optimal trajectory routes for small to medium sized airlines to minimize direct operating costs while complying with various airline operating constraints. STAFPLAN incorporates four input databases, weather, route data, aircraft performance, and flight-specific information (times, payload, crew, fuel cost) to provide the correct amount of fuel optimal cruise altitude, climb and descent points, optimal cruise speed, and flight path.

  5. VOYAGE PLANNING

    Directory of Open Access Journals (Sweden)

    Kazimierz SKÓRA

    2016-09-01

    Full Text Available A sea voyage can be divided into three parts with varying degrees of risk: - from the berth at the port of departure to the pilot disembarkation point - from the pilot disembarkation to another pilot embarkation point near the port of call/destination - from the pilot embarkation point to the berth Results of statistical research into ship accidents at sea point to an increased number of incidents and accidents, including groundings, especially in restricted areas. Such areas are often narrow and have limited depths, while their short straight sections require frequent course alterations, often in varying hydrometeorological conditions. Due to all these factors, the voyage has to be carefully planned and all watchkeeping officers have to be well prepared to conduct the ship safely. The article presents the objectives, scope, legal basis and stages in the process of voyage planning. The compliance with the outlined principles will reduce the level of risk in maritime transport.

  6. Big plans.

    Science.gov (United States)

    Fitch, Kevin F; Doyle, James F

    2005-09-01

    In Elmhurst Memorial Healthcare's capital planning method: Future replacement costs of assets are estimated by inflating their historical cost over their lives. A balanced model is created initially based on the assumption that rates of revenue growth, inflation, investment income, and interest expense are all equal. Numbers then can be adjusted to account for possible variations, such as excesses or shortages in investment or debt balances.

  7. Business plan

    OpenAIRE

    Dorożyński, Tomasz; Urbaniak, Wojciech

    2016-01-01

    Running a business on an international scale requires not only a substantial body of knowledge but also the ability to apply it in practice. That is why our textbook, with a vast collection of practical examples, discusses a wide variety of pertinent issues connected with business operations in international markets, from international market analysis, drafting business plans, concluding business transactions and the insurance of goods through to customs clearance procedures and professional ...

  8. Strategic plan

    International Nuclear Information System (INIS)

    1993-01-01

    In November 1989, the Office of Environmental Restoration and Waste Management (EM) was formed within the US Department of Energy (DOE). The EM Program was born of the recognition that a significant national effort was necessary to clean up over 45 years' worth of environmental pollution from DOE operations, including the design and manufacture of nuclear materials and weapons. Within EM, the Deputy Assistant Secretary for Environmental Restoration (EM-40) has been assigned responsibility for the assessment and cleanup of areas and facilities that are no longer a part of active DOE operations, but may be contaminated with varying levels and quantifies of hazardous, radioactive, and n-mixed waste. Decontamination and decommissioning (D ampersand D) activities are managed as an integral part of Envirorunental Restoration cleanup efforts. The Office of Environmental Restoration ensures that risks to the environment and to human health and safety are either eliminated or reduced to prescribed, acceptable levels. This Strategic Plan has been developed to articulate the vision of the Deputy Assistant Secretary for Environmental Restoration and to crystallize the specific objectives of the Environmental Restoration Program. The document summarizes the key planning assumptions that guide or constrain the strategic planning effort, outlines the Environmental Restoration Program's specific objectives, and identifies barriers that could limit the Program's success

  9. Planning Inequality

    DEFF Research Database (Denmark)

    Mandersheid, Katharina; Richardson, Tim

    2011-01-01

    as a territorial container, in which the social merges into regional and national entities. Correspondingly, movement is only interpreted as a derived demand, ignoring its integrative aspect as precondition of participation and part of network capital. On the other hand, the spatiality of the economy...... is represented as something outside and fluid which is meant to be channelled into the territorial containers by means of regional development and spatial planning. These representations of the social suggest a territorialized culturally integrated society as the unquestioned frame of reference which has lost...

  10. Multiemployer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active multiemployer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  11. Plan Repair as an Extension of Planning

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    In dynamic environments, agents have to deal with changing situations. In these cases, repairing a plan is often more efficient than planning from scratch, but existing planning techniques are more advanced than existing plan repair techniques. Therefore, we propose a straightforward method to

  12. Planning documents: a business planning strategy.

    Science.gov (United States)

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  13. Plan Colombia

    Directory of Open Access Journals (Sweden)

    Noam Chomsky

    2000-12-01

    Full Text Available Colombia recibe más ayuda militar de Estados Unidos que el resto de América Latina y el Caribe unidos, y esta situación puede profundizarse con la ejecución del Plan Colombia, fundamentado en la lucha antidrogas. Sin embargo, el pais ha sido calificado con el récord en violación de derechos humanos. En este contexto se aplica la reforma económica más significativa en la década de los noventa, generando condicionantes en los procesos de integración con sus vecinos. En concordancia con el secretario de Defensa, Henry Stimson, desde los años 60 Estados Unidos estaba autorizado para controlar su propio sistema regional, mientras todos los demás intenlos serian desmantelados. La presentación ambigua de esta política del gobierno estadounidense en Colombia es cómo disociar esta guerra contra la droga y la lucha irregular contrainsurgente En Estados Unidos hay otra opinión que debe conocerse para comprender las divergencias en e! interior de dicho país. Este artículo del prestigioso profesor universitario del MU, Noam Chomsky, es un referente obligado en términos de opinión pública y académica de dimensión internacional, por el inmenso respeto que infunde tanto en América como en Europa

  14. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  15. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  16. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  17. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  18. Teaching Treatment Planning.

    Science.gov (United States)

    Seligman, Linda

    1993-01-01

    Describes approach to teaching treatment planning that author has used successfully in both seminars and graduate courses. Clarifies nature and importance of systematic treatment planning, then describes context in which treatment planning seems more effectively taught, and concludes with step-by-step plan for teaching treatment planning.…

  19. Intelligent robot action planning

    Energy Technology Data Exchange (ETDEWEB)

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  20. Planning hierarchy, modeling and sdvanced planning dystems

    OpenAIRE

    Meyr, Herbert Ottmar

    2003-01-01

    Planning hierarchy, modeling and sdvanced planning dystems / B. Fleischmann, H. Meyr. - In: Supply chain management / ed. by A. G. de Kok ... - Amsterdam u.a. : Elsevier, 2003. - (Handbooks in operations research and management science ; 11)

  1. Financial planning

    OpenAIRE

    Χατζηγώγου, Αρτεμις Π.

    2003-01-01

    Σκοπός της μελέτης αυτής, είναι η συγκέντρωση όλων των στοιχείων εκείνων που συνθέτουν μια οργανωμένη διαδικασία έρευνας, που είναι γνωστή ως Financial Planning. Θα μπορούσαμε εναλλακτικά να πούμε, ότι βασικά ο χρηματοοικονομικός σχεδιασμός προγραμματίζει, εξευρίσκει και χρησιμοποιεί τα κεφάλαια με τέτοιο τρόπο ώστε η συνεισφορά τους να είναι μεγαλύτερη στην αποτελεσματική λειτουργία της οικονομικής μονάδας. Παρέχει τις γνώσεις των χρηματιστικών αγορών από όπου αντλούνται τα κεφάλαια. Οδηγεί ...

  2. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  3. Calfornia General Plans

    Data.gov (United States)

    California Natural Resource Agency — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  4. Understanding health insurance plans

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/patientinstructions/000879.htm Understanding health insurance plans To use the sharing features on this ... plan for you and your family. Types of Health Insurance Plans Depending on how you get your health ...

  5. The ground based plan

    International Nuclear Information System (INIS)

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  6. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  7. Conditional Epistemic Planning

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without...... branching, plans can offer only the possibility of achieving the goal (weak planning). We show how to formulate planning in uncertain domains using DEL and give a language of conditional plans. Translating this language to standard DEL gives verification of both strong and weak plans via model checking....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  8. Marketing Planning: Feeniks Koulu

    OpenAIRE

    Raut, Biranjan

    2013-01-01

    Degree Thesis “Marketing Planning: Feeniks Koulu” demonstrates structured marketing planning process with the help of case company “Feeniks Koulu”. The central idea of Thesis is to come up with systematic marketing plan following structured process. Thesis employs qualitative research methodology following inductive reasoning approach. Thesis, initiates by outlining theoretical planning methods, which then is materialized into marketing plan with the help of empirical research. Discussion and...

  9. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  10. Planned hospital birth versus planned home birth

    DEFF Research Database (Denmark)

    Olsen, O.; Clausen, J.A.

    2012-01-01

    Observational studies of increasingly better quality and in different settings suggest that planned home birth in many places can be as safe as planned hospital birth and with less intervention and fewer complications. This is an update of a Cochrane review first published in 1998....

  11. Changed planning for planned and unplanned change

    NARCIS (Netherlands)

    Woerkum, van C.; Aarts, N.; Herzele, Van A.

    2011-01-01

    Change, planned and unplanned, can be the product of events (change by chance), new language (change from societal interaction), and practices (track-bound change), and can involve many different societal actors. To position planning as an activity within this broader context, we present a model

  12. Planning for information systems

    CERN Document Server

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  13. The nuclear emergency plans

    International Nuclear Information System (INIS)

    Fuertes Menendez, M. J.; Gasco Leonarte, L.; Granada Ferrero, M. J.

    2007-01-01

    Planning of the response to emergencies in nuclear plants is regulated by the Basic Nuclear Emergency Plan (PLABEN). This basic Plan is the guidelines for drawing up, implementing and maintaining the effectiveness of the nuclear power plant exterior nuclear emergency plans. The five exterior emergency plans approved as per PLABEN (PENGUA, PENCA, PENBU, PENTA and PENVA) place special emphasis on the preventive issues of emergency planning, such as implementation of advance information programs to the population, as well as on training exercises and drills. (Author)

  14. Infrastructure Area Simplification Plan

    CERN Document Server

    Field, L.

    2011-01-01

    The infrastructure area simplification plan was presented at the 3rd EMI All Hands Meeting in Padova. This plan only affects the information and accounting systems as the other areas are new in EMI and hence do not require simplification.

  15. INDOT Technical Training Plan

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  16. DASH Eating Plan

    Science.gov (United States)

    ... Approaches to Stop Hypertension. It is an eating plan that is based on research studies sponsored by ... risk of getting heart disease. The DASH eating plan Emphasizes vegetables, fruits, and whole-grains Includes fat- ...

  17. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  18. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  19. Planning for Office Automation.

    Science.gov (United States)

    Mick, Colin K.

    1983-01-01

    Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)

  20. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  1. Planning for Pregnancy

    Science.gov (United States)

    ... Before Pregnancy Home Overview Planning for Pregnancy Women Men Image Library Women Who Want to Become Pregnant Women Who Do Not Want to Become Pregnant Hugging Nutrition Physical Activity Visiting the Doctor Planning for Pregnancy Language: English ( ...

  2. Planning a pregnancy

    Science.gov (United States)

    ... on Twitter Facebook Pinterest Email Print Planning a pregnancy Lupus Foundation of America September 27, 2017 Resource ... History or presence of antiphospholipid antibodies Planning Your Pregnancy Although many lupus pregnancies will have no complications, ...

  3. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... To receive Breastfeeding email updates Enter email Submit Planning ahead From choosing the crib to finding a ... care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  4. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  5. The Plan's the Thing.

    Science.gov (United States)

    Raley, Nancy

    1986-01-01

    Planning is the process of setting direction, priorities, and guidelines. A CASE survey of public relations professionals is described that notes the use of staff retreats and brainstorming sessions, among other techniques and strategies, that help professionals plan. (MLW)

  6. Holiday Meal Planning

    Science.gov (United States)

    ... Count Glycemic Index Low-Calorie Sweeteners Sugar and Desserts Fitness Exercise & Type 1 Diabetes Get Started Safely ... plan ahead. Fitting in Sweets Learn about eating desserts on special occasions. In this section Planning Meals ...

  7. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  8. Planning of nets

    International Nuclear Information System (INIS)

    Carberry, M

    1996-01-01

    The paper is about the planning of nets in areas of low density like it is the case of the rural areas. The author includes economic and technological aspects, planning of nets, demands and management among others

  9. Integrated transportation scenario planning.

    Science.gov (United States)

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  10. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding ...

  11. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Help Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ... Help Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ...

  12. USCG Security Plan Review

    Data.gov (United States)

    Department of Homeland Security — The Security Plan Review module is intended for vessel and facility operators to check on the status of their security plans submitted to the US Coast Guard. A MISLE...

  13. Network development plan 1995

    International Nuclear Information System (INIS)

    Anon.

    1995-11-01

    Network plan 1995 concerns several strategic problems, among others environmental policy of power transmission lines. Possibilities of restructuring aerial cable network are described. The state of the existing systems and plans for new network systems are presented. (EG)

  14. An Automation Planning Primer.

    Science.gov (United States)

    Paynter, Marion

    1988-01-01

    This brief planning guide for library automation incorporates needs assessment and evaluation of options to meet those needs. A bibliography of materials on automation planning and software reviews, library software directories, and library automation journals is included. (CLB)

  15. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  16. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  17. Interactive Energy Planning

    DEFF Research Database (Denmark)

    Blarke, Morten Boje

    2006-01-01

    Though it is being questioned whether planning theory should be fitted into neat typologies, some have described evolving planning theory as a journey away from ethnocentrism, through the lands of rationalism, pragmatism, socio-ecological idealism, political-economic mobilization, currently...... anchoring along the shores of the land of communications and collaboration. Whether or not a particular typology is applicable, theory and praxis are establishing standpoints, which strengthens our understanding of the planning complex, and which should inspire improved energy planning methodologies...

  18. Sport event marketing plan

    Directory of Open Access Journals (Sweden)

    Gašović Milan

    2007-01-01

    Full Text Available A marketing plan details how an event organization will compete in the marketplace in terms of its service offerings, promotions and evaluation. During the first stage of the marketing plan process, a number of its consumers (current, former and prospective and competitors. Marketing objectives are developed and implemented using an action plan. The marketing plan objectives are evaluated using an objective-discrepancy approach to determine the extent to which they were attained.

  19. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social mobil...

  20. Planning for agroforestry

    NARCIS (Netherlands)

    Budd, W.W.; Duchhart, I.; Hardesty, L.N.; Steiner, F.

    1990-01-01

    In this book a selection of contributions to the international symposium "Planning for agroforestry", held at Washington State University on April 24-27, 1989, is published. First the planning for agroforestry and agroforestry diagnosis and design is viewed over. Then the planning for and

  1. Generational Pension Plan Designs

    NARCIS (Netherlands)

    Huang, Xiaohong; Mahieu, Ronald

    2010-01-01

    We propose a generational plan for the occupational pension provision in which people from the same generation are pooled in a generational fund. Each fund can set its own policies independently. This plan provides the benefits of differentiation missing in the prevailing collective plan and the

  2. Making a Quit Plan

    Science.gov (United States)

    ... BACK CLOSE SMOKEFREE.GOV HOME Create My Quit Plan Quitting starts now. Make a plan . Step 1 of 7 mark Step 2 of ... boosts your chances of success. Build a quit plan to get ready and find out what to ...

  3. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  4. Planning for study abroad.

    Science.gov (United States)

    Freeman, L H; Hermann, C P

    1994-01-01

    There is more to planning for study abroad than buying airplane tickets. Providing a successful course away from the host institution requires a great deal of planning by the educator. This planning includes course development, budget, marketing, travel, housing, food, and entertainment. Careful preparation provides both the educator and student a unique and enriching experience that goes beyond the traditional course.

  5. Bounded Intention Planning Revisited

    OpenAIRE

    Sievers Silvan; Wehrle Martin; Helmert Malte

    2014-01-01

    Bounded intention planning provides a pruning technique for optimal planning that has been proposed several years ago. In addition partial order reduction techniques based on stubborn sets have recently been investigated for this purpose. In this paper we revisit bounded intention planning in the view of stubborn sets.

  6. Plan Merging : Experimental results

    NARCIS (Netherlands)

    De Weerdt, M.M.; Van der Krogt, R.P.J.; Zutt, J.

    2003-01-01

    In this paper we discuss the results of a plan merging algorithm. This algorithm coordinates the plans of multiple, autonomous agents, each able to independently find a plan. This algorithm is evaluated using realistic data from a taxi company. We show that when we allow passengers to be a few

  7. Introduction to planning law

    International Nuclear Information System (INIS)

    Ronellenfitsch, M.

    1986-01-01

    The author surveys the planning law in the Federal Republic of Germany. He deals with general regulations of the administrative procedure and land-use planning procedure and the main special rules of planning law, according to the Atomic Energy Act, the Nuclear Installation Ordinance and the Federal Act on the Protection against Nuisances. (WG) [de

  8. NACS Store Planning Manual.

    Science.gov (United States)

    College Store Journal, 1979

    1979-01-01

    Topics discussed by the NACS Store Planning/Renovation Committees in this updated version of the college store renovation manual include: short- and long-range planning, financial considerations, professional planning assistance, the store's image and business character, location considerations, building requirements, space requirements, fixtures,…

  9. Language Policy and Planning.

    Science.gov (United States)

    Takala, Sauli; Sajavaara, Kari

    2000-01-01

    Focuses on foreign language planning, or the planned changes in foreign language instructional systems and in uses of languages in different social contexts with special reference to the Nordic and Baltic countries. Special attention is given to the relationship between language planning and evaluation. (Author/VWL)

  10. Climate plan 2004; Plan climat 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO{sub 2} each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  11. Transportation planning for planned special events

    Science.gov (United States)

    2011-05-01

    Unique among planned special event activities are those events that carry the National Special Security Event (NSSE) designation. NSSEs occur with some frequency, with 35 of these events held between September 1998 and February 2010. These events inc...

  12. The alignment between spatial planning, transportation planning ...

    African Journals Online (AJOL)

    planning and environmental management strategically, functionally and operationally is ongoing .... between the built and the natural environment .... priorities as being experienced in. South Africa. 2. ... (intervention) proposals as contained.

  13. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  14. Tax Planning for Enterprises

    Institute of Scientific and Technical Information of China (English)

    Fan Weiqing

    2011-01-01

    @@ Tax planning is legal planning activities for tax savings, meaning tax payers make operation plans within the national policy framework and choose operation programs favorable to tax savings.Along with a maturing socialist market economy system in China, tax planning is becoming an integral part of enterprise management and operation.For a better tax planning, enterprises have to fully understand the meaning, get proficient at relevant strategies, and apply these methods to save taxes and realize the maximization of enterprise value while considering the actual situation.

  15. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  16. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  17. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  18. Smart City Planning

    DEFF Research Database (Denmark)

    Ekman, Ulrik

    2018-01-01

    This article reflects on the challenges for urban planning posed by the emergence of smart cities in network societies. In particular, it reflects on reductionist tendencies in existing smart city planning. Here the concern is with the implications of prior reductions of complexity which have been...... undertaken by placing primacy in planning on information technology, economical profit, and top-down political government. Rather than pointing urban planning towards a different ordering of these reductions, this article argues in favor of approaches to smart city planning via complexity theory....... Specifically, this article argues in favor of approaching smart city plans holistically as topologies of organized complexity. Here, smart city planning is seen as a theory and practice engaging with a complex adaptive urban system which continuously operates on its potential. The actualizations in the face...

  19. On strategic spatial planning

    Directory of Open Access Journals (Sweden)

    Tošić Branka

    2014-01-01

    Full Text Available The goal of this paper is to explain the origin and development of strategic spatial planning, to show complex features and highlight the differences and/or advantages over traditional, physical spatial planning. Strategic spatial planning is seen as one of approaches in legally defined planning documents, and throughout the display of properties of sectoral national strategies, as well as issues of strategic planning at the local level in Serbia. The strategic approach is clearly recognized at the national and sub-national level of spatial planning in European countries and in our country. It has been confirmed by the goals outlined in documents of the European Union and Serbia that promote the grounds of territorial cohesion and strategic integrated planning, emphasizing cooperation and the principles of sustainable spatial development. [Projekat Ministarstva nauke Republike Srbije, br. 176017

  20. Setup planning for machining

    CERN Document Server

    Hazarika, Manjuri

    2015-01-01

    Professionals as well as researchers can benefit from this comprehensive introduction into the topic of setup planning, which reflects the latest state of research and gives hands-on examples. Starting with a brief but thorough introduction, this book explains the significance of setup planning in process planning and includes a reflection on its external constraints. Step-by-step the different phases of setup planning are outlined and traditional as well as modern approaches, such as fuzzy logic based setup planning, on the solution of setup planning problems are presented. Three detailed examples of applications provide a clear and accessible insight into the up-to-date techniques and various approaches in setup planning.

  1. PlanJury: probabilistic plan evaluation revisited

    Science.gov (United States)

    Witte, M.; Sonke, J.-J.; van Herk, M.

    2014-03-01

    Purpose: Over a decade ago, the 'Van Herk margin recipe paper' introduced plan evaluation through DVH statistics based on population distributions of systematic and random errors. We extended this work for structures with correlated uncertainties (e.g. lymph nodes or parotid glands), and considered treatment plans containing multiple (overlapping) dose distributions (e.g. conventional lymph node and hypo-fractionated tumor doses) for which different image guidance protocols may lead to correlated errors. Methods: A command-line software tool 'PlanJury' was developed which reads 3D dose and structure data exported from a treatment planning system. Uncertainties are specified by standard deviations and correlation coefficients. Parameters control the DVH statistics to be computed: e.g. the probability of reaching a DVH constraint, or the dose absorbed at given confidence in a (combined) volume. Code was written in C++ and parallelized using OpenMP. Testing geometries were constructed using idealized spherical volumes and dose distributions. Results: Negligible stochastic noise could be attained within two minutes computation time for a single target. The confidence to properly cover both of two targets was 90% for two synchronously moving targets, but decreased by 7% if the targets moved independently. For two partially covered organs at risk the confidence of at least one organ below the mean dose threshold was 40% for synchronous motion, 36% for uncorrelated motion, but only 20% for either of the organs separately. Two abutting dose distributions ensuring 91% confidence of proper target dose for correlated motions led to 28% lower confidence for uncorrelated motions as relative displacements between the doses resulted in cold spots near the target. Conclusions: Probabilistic plan evaluation can efficiently be performed for complicated treatment planning situations, thus providing important plan quality information unavailable in conventional PTV based evaluations.

  2. National energy and nuclear power system plans of the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schmidt-Kuester, W.J.

    1977-01-01

    Continuous and secure procurement of energy is of vital importance for our national economy. This has been demonstrated drastically during and after the energy crisis in 1973. Therefore, the aim of energy policy in the Federal Republic of Germany is to make energy available: (1) in always sufficient quantities; (2) with a maximum degree of security of supply; (3) in a way to protect the environment to a maximum extent; (4) at the cheapest possible cost to the economy. The other aim of our energy policy is to diversify the basis of primary energy sources in order to reduce our dependence on imported oil as fast as this is possible under reasonable economic conditions. For these reasons our efforts are concentrated on the development of nuclear and new non-nuclear energy sources as well as on the development of technologies on energy conservation. The concept of the Federal Republic of Germany for the development of new energy sources is outlined in the FRG program of energy research and technology. It combines the continuation of the 4. nuclear program of FRG (1973-1976) and the skeleton program of non-nuclear energy research (1974-1977). In continuation of existing activites the main object of the new program will be again the development of nuclear energy concentrating on advanced reactor systems, nuclear fuel cycle and safety and radiation protection research. In addition large efforts are made in the area of coal technology, the development of new primary and secondary energy sources and methods for energy conservation. Until 1985 in the FRG the percentage of nuclear energy will be increased from 2% of today to 15% in 1985, i.e. approximately 45.000 MWe. The development of nuclear power systems will be performed by industry and nuclear research centers. At present there are about 25.000 people working in this area

  3. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  4. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  5. Agent independent task planning

    Science.gov (United States)

    Davis, William S.

    1990-01-01

    Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

  6. Operation planning device

    International Nuclear Information System (INIS)

    Watanabe, Takashi; Odakawa, Naoto; Erikuchi, Makoto; Okada, Masayuki; Koizumi, Atsuhiko.

    1996-01-01

    The device of the present invention provides a device suitable for monitoring a reactor core state and operation replanning in terms of reactor operation. Namely, (1) an operation result difference judging means judges that replanning is necessary when the operation results deviates from the operation planning, (2) an operation replanning rule data base storing means stores a deviation key which shows various kinds of states where the results deviate from the planning and a rule for replanning for returning to the operation planning on every deviating key, (3) an operation replanning means forms a new operation planning in accordance with the rule which is retrieved based on the deviation key, (4) an operation planning optimizing rule data base storing means evaluates the reformed planning and stores it on every evaluation item, (5) an operation planning optimization means correct the operation planning data so as to be optimized when the evaluation of the means (4) is less than a reference value, and (6) an operation planning display means edits adaptable operation planning data and the result of the evaluation and displays them. (I.S.)

  7. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  8. Present status and future plan of the research using HIMAC of NIRS

    International Nuclear Information System (INIS)

    Kawachi, Kiyomitsu

    1996-01-01

    The Heavy Ion Medical Accelerator in Chiba (HIMAC) was completed in 1993, and since June of 1994 heavy ion therapy has made a new start at this facility after closed-down of the BEVALAC accelerator at LBL in Berkeley, California in 1992. The HIMAC is also opened for the researchers of outside of NIRS as well as the clinical trial of the heavy ion therapy. In this report, I will describe on the present status of HIMAC facility, the beam characteristics and the future developments of HIMAC. (author)

  9. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  10. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  11. Practical Planning in COLLAGE

    Science.gov (United States)

    Lansky, Amy L.; Getoor, Lise C.; Friedland, Peter (Technical Monitor)

    1994-01-01

    COLLAGE is a domain-independent planner that differs from traditional planners in two key ways: (1) it uses a diverse and extendible set of (it action-based) plan constructions methods; and (2) it utilizes a technique called (it localization) to partition the planning problem into smaller (and potentially interacting) sub problems. In this paper, we describe these features and how they are exploited in two different real-world planning domains. The first domain, building construction planning, has served as a framework for us to investigate how localization can improve scalability. The second domain, data analysis planning, benefits from COLLAGE's unique plan construction and representation methods. In addition, we describe extensions that were necessary to tackle these real-world problems.

  12. Business plan competition

    CERN Multimedia

    2007-01-01

    "Venture – Companies for tomorrow" is a business plan competition, which supports students and other junior entrepreneurs in developing their business plans. The sixth edition of the competition is now taking place. Venture 2008 highlights: - prize money totalling CHF 150’000; - possibility to optimize business ideas and business plans with the help of experienced coaches: around 200 coaches are available, with a wide range of backgrounds, entrepreneurs as well as venture capitalists; -\tpossibility to present business ideas and business plans to potential investors ("Investor Days" - 17 January and 7 May); - active involvement in the start-up community; -\tcontribution to potential independence. The competition consists of two phases: Phase I, Business idea, Deadline for submission of business idea: 5 December 2007 (online at http://www.venture.ch). Award Ceremony: 17 January 2008 Phase II, Business plan Deadline for submission of business plan: 2 April 2008 (online at...

  13. Influenza pandemic planning guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    An influenza pandemic will have serious economic impacts on the natural gas industry due to absenteeism as well as downstream effects due to supply disruption.This guide was prepared to assist gas distribution companies in planning for an influenza epidemic. The guide aimed to minimize the risks that an influenza pandemic might pose to the health and safety of employees and the continuity of business operations. The guide discussed 5 critical aspects of emergency planning: (1) prevention and threat mitigation; (2) preparedness; (3) response; (4) business continuity; and (5) communication. The legal context of the emergency plans were discussed. The plans were also discussed to other essential infrastructure emergency response plans. Recommendations were presented for infection control, decentralization and access restriction. Outlines for pandemic response planning teams and training and exercise programs were provided. Issues related to alert, mobilization, and response procedures were also discussed. 10 refs., 3 tabs., 1 fig.

  14. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  15. Planning Practice and Research

    DEFF Research Database (Denmark)

    2013-01-01

    Urban planning has dramatically shifted when compared with its former logics and styles. Increasingly, the dynamics of large urban agglomerations spanning multiple boundaries put significant pressure on planning institutions to scale up. In this shifting context, how can both planning theory...... and practice co- evolve in adapting to the ever-increasing transformation of cities and urban regions? In this context, Planning Practice and Research (PPR) is seeking perspectives from the young academic community in planning. We propose to publish at least one special edition of PPR with a number of short...... papers from Young Academics. The contributions should address the question of how planning theory and practice can respond to the increasing complexity of cities and regions....

  16. Utility planning for decommissioning

    International Nuclear Information System (INIS)

    Williams, D.H.

    1982-01-01

    Though the biggest impact on a utility of nuclear power plant decommissioning may occur many years from now, procrastination of efforts to be prepared for that time is unwarranted. Foresight put into action through planning can significantly affect that impact. Financial planning can assure the recovery of decommissioning costs in a manner equitable to customers. Decision-making planning can minimize adverse affects of current decisions on later decommissioning impacts and prepare a utility to be equipped to make later decommissioning decisions. Technological knowledge base planning can support all other planning aspects for decommissioning and prepare a utility for decommissioning decisions. Informed project planning can ward off potentially significant pitfalls during decommissioning and optimize the effectiveness of the actual decommissioning efforts

  17. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  18. Regional manpower planning

    OpenAIRE

    G. Erens; P. Salamink; C.A. Van der Merwe CA

    2003-01-01

    Particular problems come to the fore when planning development at the regional level. These range from the complexities of the multifarious interactions between the sect oral and local components of the region to the necessity of achieving extensive participation of regional stakeholders in the planning process. In this paper a methodology for regional manpower planning is proposed. The methodology is designed to accommodate the full range of problems by applying a systems approach which is b...

  19. Tax planning in corporation

    OpenAIRE

    Nevodnicheva, Yulia

    2010-01-01

    This thesis "Tax planning in corporation" puts brain to legal entity income tax and it is looking for possible solutions in tax planning in corporation. The first part deals with the tax theory, the other part is the theory of tax planning, comparison of tax regimes and tax policy and tax revenue by optimizing both internationally and in the local aspect. The last part discusses options for optimizing tax

  20. Biodiesel Test Plan

    Science.gov (United States)

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  1. China SLAT Plan Template

    Energy Technology Data Exchange (ETDEWEB)

    Dietrich, Richard E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

  2. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  3. Animation of planning algorithms

    OpenAIRE

    Sun, Fan

    2014-01-01

    Planning is the process of creating a sequence of steps/actions that will satisfy a goal of a problem. The partial order planning (POP) algorithm is one of Artificial Intelligence approach for problem planning. By learning G52PAS module, I find that it is difficult for students to understand this planning algorithm by just reading its pseudo code and doing some exercise in writing. Students cannot know how each actual step works clearly and might miss some steps because of their confusion. ...

  4. Reasoning about plans

    CERN Document Server

    Allen, James; Pelavin, Richard; Tenenberg, Josh

    1991-01-01

    This book presents four contributions to planning research within an integrated framework. James Allen offers a survey of his research in the field of temporal reasoning, and then describes a planning system formalized and implemented directly as an inference process in the temporal logic. Starting from the same logic, Henry Kautz develops the first formal specification of the plan recognition process and develops a powerful family of algorithms for plan recognition in complex situations. Richard Pelavin then extends the temporal logic with model operators that allow the representation to

  5. Strategic planning for neuroradiologists.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan. Copyright © 2012 Elsevier Inc. All rights reserved.

  6. Business Plans For Dummies

    CERN Document Server

    Tiffany, Paul; Barrow, Colin

    2011-01-01

    A full updated and extended second edition of an established UK bestseller Business Plans For Dummies 2nd Edition features new and updated information on formulating a solid business plan to build a secure business - even in an economic downturn. Complete with a brand new business plan template to get you started this expert guide offers fresh advice on reading the competitive marketplace and assessing your business in the current economic climate. It walks you step-by-step through every aspect of planning achievable business goals and diversification strategies, identifying trends, exploring

  7. Planning Complex Projects Automatically

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  8. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  9. Public Participation Plan

    International Nuclear Information System (INIS)

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  10. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  11. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  12. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  13. Automating Space Station operations planning

    Science.gov (United States)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  14. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  15. EMI Registry Development Plan

    CERN Document Server

    Memon, S.; Szigeti, G.; Field, L.

    2012-01-01

    This documents describes the overall development plan of the EMI Registry product, the plan focuses on the realisation of the EMI Registry specification as defined in the document. It is understood that during the course of the development phase the specification will likely evolve and the changes will be fed into the specification document.

  16. Technology Planning Strategies

    Science.gov (United States)

    Decker, Kathy

    2004-01-01

    Effective planning strategies drive achievement of an overall technology goal to increase access to electronic information in real time in order to increase efficiency, productivity, and communication across campus. Planning relies on providing access, 'Anytime Anywhere' to student information, calendar, email, course management tools, and the…

  17. A landscape analysis plan

    Science.gov (United States)

    Nancy E. Fleenor

    2002-01-01

    A Landscape Analysis Plan (LAP) sets out broad guidelines for project development within boundaries of the Kings River Sustainable Forest Ecosystems Project. The plan must be a dynamic, living document, subject to change as new information arises over the course of this very long-term project (several decades). Two watersheds, each of 32,000 acres, were dedicated to...

  18. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  19. Statistical Analysis Plan

    DEFF Research Database (Denmark)

    Ris Hansen, Inge; Søgaard, Karen; Gram, Bibi

    2015-01-01

    This is the analysis plan for the multicentre randomised control study looking at the effect of training and exercises in chronic neck pain patients that is being conducted in Jutland and Funen, Denmark. This plan will be used as a work description for the analyses of the data collected....

  20. Jobs Plan Highlights Education

    Science.gov (United States)

    Klein, Alyson

    2011-01-01

    President Barack Obama is putting new money to save educators' jobs and help states refurbish aging school facilities at the center of a nearly $450 billion plan to jump-start the sluggish economy. The author talks about the president's plan which is sure to face hurdles in a politically polarized Washington where one house of Congress is…

  1. A Process for Planning.

    Science.gov (United States)

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  2. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  3. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  4. Temporal logic motion planning

    CSIR Research Space (South Africa)

    Seotsanyana, M

    2010-01-01

    Full Text Available In this paper, a critical review on temporal logic motion planning is presented. The review paper aims to address the following problems: (a) In a realistic situation, the motion planning problem is carried out in real-time, in a dynamic, uncertain...

  5. Creating a Marketing Plan.

    Science.gov (United States)

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  6. Planning for College Success

    Science.gov (United States)

    PEPNet, 2009

    2009-01-01

    "Planning for College Success" (PCS) is a curriculum model designed by Sharon Downs, M.S., for a course intended to assist deaf and hard of hearing students during their initial introduction to college life. This program allows students to work one-on-one with a counselor to plan for their college success. The program includes short-term goals and…

  7. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  8. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  9. Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  10. 'Plans are useless'.

    Science.gov (United States)

    Bland, Michael

    2013-01-01

    An essential element in crisis recovery is the protection and/or recovery of reputation. This calls for a crisis communications function that is of more than passing interest to the business continuity specialist and which presents two major challenges in this era of process-driven management: (1) it is an inexact science, more about common sense, psychology, empathy and 'playing it by ear' than about box ticking; (2) it does not lend itself to detailed, rigid plans, although some degree of planning is essential. This paper outlines a flexible approach that will help the crisis team to develop a workable communications plan that strikes a balance between being too detailed and too sketchy. It argues that the whole management team should be involved in developing the plan and sets a number of questions, which, on being answered, will help a realistic, achievable and effective plan to evolve.

  11. Can Complexity be Planned?

    Directory of Open Access Journals (Sweden)

    Ilona Koutny

    2015-04-01

    Full Text Available The long accepted complexity invariance of human languages has become controversial within the last decade. In investigations of the problem, both creole and planned languages have often been neglected. After a presentation of the scope of the invariance problem and the proposition of the natural to planned language continuum, this article will discuss the contribution of planned languages. It will analyze the complexity of Esperanto at the phonological, morphological, syntactic and semantic levels, using linguistic data bases. The role of the L2 speech community and development of the language will also be taken into account when discussing the endurance of the same level of simplicity of this planned international language. The author argues that complexity can be variable and to some extent planned and maintained.

  12. Health Workforce Planning

    Science.gov (United States)

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  13. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  14. Effective Hull IMMR plan

    Energy Technology Data Exchange (ETDEWEB)

    Franco, Mireille

    2010-07-01

    The objective of the Hull Inspection, Maintenance and Repair Plan is to ensure the total integrity of the Floating Production Unit. To be efficient, the Monitoring has to be part of the Hull Inspection, Monitoring, Maintenance and Repair Plan (IMMR). The IMMR Plan should be developed during the design and project phases and take into account the interfaces between the different systems and teams' tasks in operation. The IMMR is multidisciplinary and form part of the hand-over to ensure an efficient and early implementation. Implementation of such a complex plan requires: - Cross-functionality: take advantage of the synergies - Boldness: break the mould and think outside the box - Listening: be attentive, be available, - Mutual support: during good and bad times. This paper presents the way Total believe the Hull IMMR Plan shall be developed, implemented and followed up. (Author)

  15. Emergency plan belgian experience

    International Nuclear Information System (INIS)

    Clymans, A.

    1989-01-01

    The Chernobyl disaster prompted authorities in Belgium to carry out a comprehensive review of all emergency plans and, in particular, those designed specifically for nuclear accidents. This review was aimed at determining what type of plans existed and to what extent such plans were operational. This paper sets out to present a broad overview of different aspects of this problem: organization of public emergency plans, co-ordination of operations, merits and demerits of centralization as opposed to decentralization, planning zones, obligation to release information to the public and relations with the media, and finally the international dimension to the problem. The author expresses the hope that the latter area will inspire practical suggestions [fr

  16. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on "what is actually...... done", as opposed to Habermas`  focus on "what should be done". We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  17. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    2002-01-01

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on ?what is actually...... done?, as opposed to Habermas?s focus on ?what should be done?. We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...... offers better prospects than does Habermas for those interested in understanding and bringing about democratic social change through planning....

  18. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  19. Spill control and intensity monitoring for the Bevatron--Bevalac external particle beams

    International Nuclear Information System (INIS)

    Barale, J.J.; Crebbin, K.C.

    1975-03-01

    Time-intensity modulation in beam spill can be of primary concern in some experiments. The major source of this beam structure is from main-guide field-magnet power supply ripple. If the time constants are appropriate, then final control of beam structure can be accomplished by closed loop control of the intensity of beam spill. The response characteristics of the feedback system will determine the final structure. At high beam fluxes signal to noise ratio of beam detectors, in the feedback loop, can be improved by at least four orders of magnitude by using photomultiplier tubes and a water Cherenkov counter in place of the normal secondary emission monitor. At beam fluxes below 10 10 particles per second (PPS), a plastic scintillator and photomultiplier tube are used in the feedback system. A plastic scintillator and photomultiplier are also used in the beam as intensity monitors. At intensities below about 10 7 PPS standard counting techniques are used. For intensities between 10 6 to 110 9 PPS, the photomultiplier is used as a current source driving an integrating circuit which is then calibrated to read the number of particles per pulse. (U.S.)

  20. Evidence for anomalous nuclei among relativistic projectile fragments at Bevalac energies

    International Nuclear Information System (INIS)

    Heckman, H.H.

    1981-01-01

    Two independent emulsion experiments using beams of 16 O and 56 Fe at approximately 2 GeV/nucleon find that the reaction mean free paths of projectile fragments (PF) with Z between 3 and 26 are shorter for a few centimeters after their emission than at larger distances, or than predicted from experiments on beam nuclei. Under the assumption that there are two populations of PF, a best fit to the data is obtained when approximately 6% of the PF have an anomalously short mean free path. The anomalous property of PF persists in subsequent fragmentation reactions. 6 figures

  1. Operational results for the raster scanning power supply system constructed at the Bevalac Biomedical Facility

    International Nuclear Information System (INIS)

    Stover, G.; Halliwell, J.; Nyman, M.; Dwinell, R.

    1989-03-01

    A raster scanning power supply for controlling an 8.0 Tesla-meter relativistic heavy-ion beam at the Biomedical Facility has been recently completed and is undergoing electrical testing before on- line operation in 1989. The scanner system will provide tightly controlled beam uniformity and off-axis treatment profiles with large aspect ratios and unusual dimensions. This article will discuss original specifications, agreement with measured results and special device performance (i.e. GTOs, FET actuator assembly, etc.). 5 refs., 4 figs

  2. Biological and medical research with accelerated heavy ions at the Bevalac, 1977-1980

    International Nuclear Information System (INIS)

    Pirruccello, M.C.; Tobias, C.A.

    1980-11-01

    Separate abstracts were prepared for the 46 papers presented in this progress report. This report is a major review of studies with accelerated heavy ions carried out by the Biology and Medicine Division of Lawrence Berkeley Laboratory from 1977 to 1980

  3. Use of a time-projection chamber in multifragmentation experiments at the BEVALAC

    International Nuclear Information System (INIS)

    Porile, N.T.

    1991-01-01

    An exclusive study of multifragmentation is described. The moments of the fragment charge distribution are used to extract the critical exponents associated with the phase transition to which the breakup is ascribed. The fragmentation of 1 GeV/nucleon La and Au is studied by reverse kinematics using a carbon target. Fragments with Z ≤ 6 will be identified with the EOS time projection chamber (TPC) while heavier fragments will be identified with a multiple sampling ionization chamber (MUSIC). The experimental setup using these detectors will be described

  4. Multi-wire chamber system for heavy ion beam monitoring at the Bevalac

    International Nuclear Information System (INIS)

    Cuperus, J.; Morgado, R.

    1975-03-01

    Horizontal and vertical integrated beam-current profiles are generated by a system of multi-wire chambers (32 wires/profile) operating in either the ionization or proportional mode. Sixteen distinct displays (1024 words) are digitally stored and any four may be simultaneously displayed. A new display can be generated at 64 ms intervals. A central control unit selects the mode of operation, the amount of delay after an appropriate trigger, the chamber integration time, and the particular chambers to be displayed. Operating in the proportional mode, the system can detect relativistic heavy-ion beam intensities as low as 10 4 charges cm -2 sec -1 . (U.S.)

  5. Thirty years at the forefront: a perspective on the Bevatron/Bevalac

    International Nuclear Information System (INIS)

    Alonso, J.R.

    1984-09-01

    The operational experience of the Bevatron can be divided into four major periods: first, the commissioning and early experimental period, when the Bevatron was among the highest-energy machines available (1954-1962); second, a period of increasing beam intensity and higher sophistication in the experimental program (1963-1973); third, the light-ion (A less than or equal to 56) period (1974-1981; and finally, the ongoing heavy-ion period. Reference material for this paper was taken mainly from internal LBL reports and log books

  6. Mixing and matching Bevalac programs: Rapid-switching of ions and other operations highlights: Progress report

    International Nuclear Information System (INIS)

    Lothrop, F.; Alonso, J.; Krebs, G.; Miller, R.; Stevenson, R.

    1987-03-01

    Rapid switching of ion, energy, and beam line has been accomplished on a routine basis; typical transfer time is 1 to 2 minutes in worst case situations. Operational efficiency has been improved by substantial reduction of inter-experiment tune time and improved optics in the external beam area installed in 1985. A comparison of current research efficiency and previous year efficiency is given. It is shown that compatibility and productivity for two simultaneous, independent research programs are not mutually exclusive

  7. FASTBUS based data acquisition system for the DI-lepton spectrometer at the BEVALAC

    International Nuclear Information System (INIS)

    Matis, H.S.; Claesson, G.; Hendrie, D.

    1985-10-01

    A data acquisition system using FASTBUS has been developed. FASTBUS TDC's are used to record hits from a drift chamber, while FASTBUS ADC's digitize the pulse heights from the chambers. FASTBUS data are transferred to CAMAC and then written to a VAX 11/750 using a MBD. The performance of this system is discussed. 5 refs., 4 figs

  8. Biological and medical research with accelerated heavy ions at the Bevalac, 1977-1980. [Lead abstract

    Energy Technology Data Exchange (ETDEWEB)

    Pirruccello, M.C.; Tobias, C.A. (eds.)

    1980-11-01

    Separate abstracts were prepared for the 46 papers presented in this progress report. This report is a major review of studies with accelerated heavy ions carried out by the Biology and Medicine Division of Lawrence Berkeley Laboratory from 1977 to 1980. (KRM)

  9. Supply chain planning classification

    Science.gov (United States)

    Hvolby, Hans-Henrik; Trienekens, Jacques; Bonde, Hans

    2001-10-01

    Industry experience a need to shift in focus from internal production planning towards planning in the supply network. In this respect customer oriented thinking becomes almost a common good amongst companies in the supply network. An increase in the use of information technology is needed to enable companies to better tune their production planning with customers and suppliers. Information technology opportunities and supply chain planning systems facilitate companies to monitor and control their supplier network. In spite if these developments, most links in today's supply chains make individual plans, because the real demand information is not available throughout the chain. The current systems and processes of the supply chains are not designed to meet the requirements now placed upon them. For long term relationships with suppliers and customers, an integrated decision-making process is needed in order to obtain a satisfactory result for all parties. Especially when customized production and short lead-time is in focus. An effective value chain makes inventory available and visible among the value chain members, minimizes response time and optimizes total inventory value held throughout the chain. In this paper a supply chain planning classification grid is presented based current manufacturing classifications and supply chain planning initiatives.

  10. Public affairs plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  11. Personal strategic planning

    Directory of Open Access Journals (Sweden)

    Rolando Juan Soliz Estrada

    2011-01-01

    Full Text Available Reconciling personal skills with the demands of a globalized and competitive market has become a pre-requisite for professionals aspiring for success in their careers. The quest for personal fulfillment has encouraged people to search for tools which develop their talents and balance their efforts, in order to achieve a better, happier and healthier life. As an option, planning, which historically was restricted to being an organizational tool, today has also come to be used by individuals who desire personal success. In this way, the objective of this article is to develop a model of Personal Strategic Planning which takes into account the various operation areas and human performance. The proposed model is divided into: Individual Planning, Professional Planning, Family Planning, Personal Business Planning and Political Participation, Social and Religious/Spiritual Planning and their respective fields. In order to analyse and validate the model, exploratory research of a qualitative nature was used through primary and secondary data sources. From the results obtained by the model, it is possible to consider their importance to future research, once the studied areas can be developed in subsequent works.

  12. Public affairs plan

    International Nuclear Information System (INIS)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies

  13. AECB strategic plan 1999

    International Nuclear Information System (INIS)

    1999-03-01

    This strategic plan provides the direction and focus required to successfully carry out our mandate in an efficient and effective manner over the next two to three years. It gives broad corporate direction by identifying where efforts need to be focussed, and therefore provides guidance for setting priorities and allocating resources. While we cannot ignore any aspect of our mandate, we must recognize that we will always have more work to do than can be accomplished within the resources available to us. Therefore we must set priorities and develop appropriate management systems to ensure that our major efforts and our resources are being directed towards those priorities. Our strategic plan is not a static document. We will always be faced with new challenges, and our strategies for meeting those challenges will also have to change. Therefore our strategic plan must be seen as a guide that reflects both the ever-changing environment and our ability to deal with new or evolving changes effectively. This plan is not intended to be a detailed operational plan. Each directorate must develop its own operational plans and procedures based on the directions in this strategic plan, and on corporate priorities and policies. (author)

  14. National Energy Plan II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This volume contains the Administration's second National Energy Plan, as required by section 801 of the Department of Energy Organization Act (Public Law 95-91). A second volume will contain an assessment of the environmental trends associated with the energy futures reported here. Detailed appendices to the Plan will be published separately. The eight chapters and their subtitles are: Crisis and Uncertainty in the World Energy Future (The Immediate Crisis and the Continuing Problem, The Emergence of the Energy Problem, The Uncertainties of the World Energy Future, World Oil Prices, Consequences for the U.S.); The U.S. Energy Future: The Implications for Policy (The Near-, Mid-, and Long-Term, The Strategy in Perspective); Conservation (Historical Changes in Energy Use, Post-Embargo Changes - In Detail, Conservation Policies and Programs, The Role of Conservation); Oil and Gas (Oil, Natural Gas); Coal and Nuclear (Coal, Nuclear, Policy for Coal and Nuclear Power); Solar and Other Inexhaustible Energy Sources (Solar Energy, Geothermal, Fusion, A Strategy for Inexhaustible Resources); Making Decisions Promptly and Fairly (Managing Future Energy Crises: Emergency Planning, Managing the Current Shortfall: The Iranian Response Plan, Managing the Long-Term Energy Problem: The Institutional Framework, Fairness in Energy Policy, Public Participation in the Development of Energy Policy); and NEP-II and the Future (The Second National Energy Plan and the Nation's Energy Future, The Second National Energy Plan and the Economy, Employment and Energy Policy, The Second National Energy Plan and Individuals, The Second National Energy Plan and Capital Markets, and The Second National Energy Plan and the Environment). (ERA citation 04:041097)

  15. Planning for the future.

    Science.gov (United States)

    Stiewing, Janis

    2002-01-01

    Revising the strategic plan was the beginning of a multiyear initiative that will determine the path of the JRCERT. The key word in the preceding statement is beginning. The strategic plan is an ever-changing document. Although some components, such as the values statements, will stand over time, other components will change as accreditation and educational arenas change. That is the paradox of strategic planning: Remaining true to the vision, values and mission statements requires knowing when to change to keep the JRCERT aligned with the responsive to its communities of interest.

  16. Heat pump planning handbook

    CERN Document Server

    Bonin, Jürgen

    2015-01-01

    The Heat Pump Planning Handbook contains practical information and guidance on the design, planning and selection of heat pump systems, allowing engineers, designers, architects and construction specialists to compare a number of different systems and options. Including detailed descriptions of components and their functions and reflecting the current state of technology this guide contains sample tasks and solutions as well as new model calculations and planning evaluations. Also economic factors and alternative energy sources are covered, which are essential at a time of rising heat costs. T

  17. Sea materials experimental plans

    International Nuclear Information System (INIS)

    1987-07-01

    This Seal Materials Performance Test Plan describes the plan for testing materials that will be used to seal a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The need for sealing and backfilling the repository and the use of various sealing materials are described. The seal materials include mined salt backfills, cementitious bulkheads and plugs, and earthen backfills. The laboratory testing program for characterizing the behavior and performance of these materials is described. This report includes plans for screening materials, evaluating candidate materials to be tested, and testing a representative set of materials

  18. Business Plan: Elpis Restaurant

    OpenAIRE

    Tran, Luu Quoc Phong

    2016-01-01

    The purpose of this Bachelor’s thesis is to create a business plan for starting up a restaurant in European – Asian style in Helsinki. While the restaurants are in European or Asian style separately, this restaurant will be unique with dishes which are based on local traditional dishes, traditional Asian dishes and mixture between them as well as creation of new dishes. This business plan is created to minimize the risk when starting up a restaurant. The plan will not only help the restaur...

  19. Environmental monitoring plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  20. Financial planning considerations at retirement.

    Science.gov (United States)

    Cole, R J

    1998-03-01

    The process of retirement planning is a difficult one for a physician. The Planning process should address the areas of Investment Planning, Estate Planning, and Risk Management. This article examines each of these dimensions with special emphasis on Modern Portfolio Theory as the basis for investment planning.

  1. What's an Asthma Action Plan?

    Science.gov (United States)

    ... Educators Search English Español What's an Asthma Action Plan? KidsHealth / For Parents / What's an Asthma Action Plan? ... acción contra el asma? What's an Asthma Action Plan? An asthma action plan (or management plan) is ...

  2. Teaching planning theory as planner roles in urban planning education

    DEFF Research Database (Denmark)

    Olesen, Kristian

    2018-01-01

    Planning theory is often portrayed as a subject that urban planning students find too abstract and fail to see the relevance of. This paper advocates the perspective that planning theory can be made more student-friendly. This requires, firstly, that academic discussions about the relevance...... of planning theory for urban planning practice are integrated into the course module. If students are to appreciate planning theory, it requires that they understand how planning theory can inspire planning practice. Secondly, it requires careful considerations to the pedagogy of planning theory. The paper...... suggests that teaching planning theory as a variety of planner roles offers a helpful pedagogical approach for helping students construct their identities as urban planners. The paper builds on the author’s own experiences of teaching planning theory in a master’s urban planning programme, and has been...

  3. Role of regional planning organizations in transportation planning across boundaries

    Science.gov (United States)

    2014-06-11

    The Volpe Center conducted research for the Federal Highway Administration Office of Planning that explores the implications of Regional Planning Organizations (RPO) engaging in transportation planning partnerships and projects of megaregions signifi...

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  5. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  6. DASH Eating Plan

    Science.gov (United States)

    ... levels declined in all three groups. The two groups that received counseling and followed a treatment plan had more weight loss than the advice-only group. However, participants who received counseling and followed the DASH diet had the greatest ...

  7. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  8. Watershed Planning Basins

    Data.gov (United States)

    Vermont Center for Geographic Information — The Watershed Planning Basin layer is part of a larger dataset contains administrative boundaries for Vermont's Agency of Natural Resources. The dataset includes...

  9. Planning for design quality

    International Nuclear Information System (INIS)

    Marguglio, B.W.

    1977-01-01

    In the nuclear industry and in other high technology industries in which the Government serves as either a customer or a regulator, it is almost always required that the contractor prepare a Quality Program Plan sometimes also referred to as a Quality Program Index. Often, the Quality Program Plan is included as part of the contractor's proposal in response to the Government's or a prime contractor's Request for Proposal. At this stage, the Quality Program Plan serves to demonstrate to the prospective customer the availability of the various quality systems. It provides the customer with a commitment as to the use of these quality systems, thus giving greater assurance that the customer's overall quality and design requirements can be met. The Quality Program Plan is contributing to the salability of the proposal. 1 ref

  10. Bridge removal plan requirements.

    Science.gov (United States)

    2011-04-15

    This report provides resources that detail specifications and guidelines related to bridge removal plans across the : United States. We have organized the information into three sections: : ! National Guidance : Includes language from AASHTO specific...

  11. Climate plan 2004

    International Nuclear Information System (INIS)

    2004-01-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO 2 each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  12. SSCL computer planning

    International Nuclear Information System (INIS)

    Price, L.E.

    1990-01-01

    The SSC Laboratory is in the process of planning the acquisition of a substantial computing system to support the design of detectors. Advice has been sought from users and computer experts in several stages. This paper discuss this process

  13. Technical Assistance Plan (TAP)

    Science.gov (United States)

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  14. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... your breastfeeding support network How to get your family on board with breastfeeding African-American celebrity moms ... health care Get health insurance Get help with family planning Get help with mental health Find girls' ...

  15. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  16. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  17. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... menu It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding ... in the African-American community Incredible facts about babies, breastmilk, and breastfeeding Overcoming challenges Common questions about ...

  18. Cancer Nanotechnology Plan

    Science.gov (United States)

    The Cancer Nanotechnology Plan serves as a strategic document to the NCI Alliance for Nanotechnology in Cancer as well as a guiding document to the cancer nanotechnology and oncology fields, as a whole.

  19. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing ... decisions. But if you haven’t already thought about breastfeeding, now is a great time. Before your baby is here is the ...

  20. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Don't Miss a Beat National Women and Girls HIV/AIDS Awareness Day National Women's Health Week ... family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media ...

  1. Joint Operation Planning

    National Research Council Canada - National Science Library

    2006-01-01

    .... It sets forth joint doctrine to govern the joint operation planning activities and performance of the Armed Forces of the United States in joint operations, and provides the joint doctrinal basis...

  2. Elective course planning

    DEFF Research Database (Denmark)

    Kristiansen, Simon; Sørensen, Matias; Stidsen, Thomas Riis

    2011-01-01

    Efficient planning increasingly becomes an indispensable tool for management of both companies and public organizations. This is also the case for high school management in Denmark, because the growing individual freedom of the students to choose courses makes planning much more complex. Due...... to reforms, elective courses are today an important part of the curriculum, and elective courses are a good way to make high school education more attractive for the students. In this article, the problem of planning the elective courses is modeled using integer programming and three different solution...... for the Elective Course Planning Problem has been described in the literature before. The proposed algorithms are tested on data sets from 98 of the 150 high schools in Denmark. The tests show that for the majority of the problems, the optimal solution can be obtained within the one hour time bound. Furthermore...

  3. Learning Through Scenario Planning

    DEFF Research Database (Denmark)

    Balarezo, Jose

    level variables, this research corrects this void by investigating the dynamics of organizational learning through the lenses of a corporate scenario planning process. This enhances our scientific understanding of the role that scenario planning might play in the context of organizational learning......This project investigates the uses and effects of scenario planning in companies operating in highly uncertain and dynamic environments. Whereas previous research on scenario planning has fallen short of providing sufficient evidence of its mechanisms and effects on individual or organizational...... and strategic renewal. Empirical evidence of the various difficulties that learning flows has to overcome as it journeys through organizational and hierarchical levels are presented. Despite various cognitive and social psychological barriers identified along the way, the results show the novel...

  4. Manpower and Transportation Planning

    NARCIS (Netherlands)

    Lai, S.W.

    2014-01-01

    This thesis studies three routing and scheduling problems arising in manpower and transportation planning. These problems are rooted in real applications, and carry interesting characteristics. By exploiting the structures of the problems, this thesis provides effective mathematical models and

  5. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Pregnancy Thyroid disease All A-Z health topics Find Help Get breastfeeding help Get health care Get ... with family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us ...

  6. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  7. A Planning Palimpsest

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay; Gutzon Larsen, Henrik; Olesen, Kristian

    2015-01-01

    In this article, we analyse the evolution and transformation of Danish spatial planning from its tentative origins in liberalist politics, through its rise as a central feature of the welfare state project, to its more recent entrepreneurial forms in a context of neoliberalisation. The article...... demonstrates how transformations of Danish spatial planning discourses and practices must be understood in context of previous discourses and practices sedimented as layers of meaning and materiality through time and over space. These layers do not completely overlay one another, but present a palimpsest...... saturated with contradictions as well as possibilities. We propose the notion of the ‘planning palimpsest’ as a helpful metaphor for drawing attention to the historical-geographical characteristics of planning discourses and practices....

  8. Hyperthermia treatment planning

    International Nuclear Information System (INIS)

    Lagendijk, J.J.W.

    2000-01-01

    The development of hyperthermia, the treatment of tumours with elevated temperatures in the range of 40-44 deg. C with treatment times over 30 min, greatly benefits from the development of hyperthermia treatment planning. This review briefly describes the state of the art in hyperthermia technology, followed by an overview of the developments in hyperthermia treatment planning. It particularly highlights the significant problems encountered with heating realistic tissue volumes and shows how treatment planning can help in designing better heating technology. Hyperthermia treatment planning will ultimately provide information about the actual temperature distributions obtained and thus the tumour control probabilities to be expected. This will improve our understanding of the present clinical results of thermoradiotherapy and thermochemotherapy, and will greatly help both in optimizing clinical heating technology and in designing optimal clinical trials. (author)

  9. Cooperative Transport Planning

    NARCIS (Netherlands)

    Zutt, J.; De Weerdt, M.M.

    2000-01-01

    To test and compare different forms of cooperative planning algorithms developed in the CABS project we use a generic simulator called MARS. Examples in the transportation sector are implemented in this simulator.

  10. Inverse planning IMRT

    International Nuclear Information System (INIS)

    Rosenwald, J.-C.

    2008-01-01

    The lecture addressed the following topics: Optimizing radiotherapy dose distribution; IMRT contributes to optimization of energy deposition; Inverse vs direct planning; Main steps of IMRT; Background of inverse planning; General principle of inverse planning; The 3 main components of IMRT inverse planning; The simplest cost function (deviation from prescribed dose); The driving variable : the beamlet intensity; Minimizing a 'cost function' (or 'objective function') - the walker (or skier) analogy; Application to IMRT optimization (the gradient method); The gradient method - discussion; The simulated annealing method; The optimization criteria - discussion; Hard and soft constraints; Dose volume constraints; Typical user interface for definition of optimization criteria; Biological constraints (Equivalent Uniform Dose); The result of the optimization process; Semi-automatic solutions for IMRT; Generalisation of the optimization problem; Driving and driven variables used in RT optimization; Towards multi-criteria optimization; and Conclusions for the optimization phase. (P.A.)

  11. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT BUSINESS CONTINUITY MANAGEMENT PLAN December 2014......maximum 200 words) Navy Supply Systems Command (NAVSUP) lacks a business process framework for the development of Business Continuity Management

  12. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Easy An Interview About Breastfeeding: Lauren Sogor Taking Care of Your Health — and Your Baby's Subscribe ... topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  13. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding support Fitting breastfeeding into your life Partner resources Subscribe To receive Breastfeeding email updates ...

  14. Planning for Higher Education.

    Science.gov (United States)

    Lindstrom, Caj-Gunnar

    1984-01-01

    Decision processes for strategic planning for higher education institutions are outlined using these parameters: institutional goals and power structure, organizational climate, leadership attitudes, specific problem type, and problem-solving conditions and alternatives. (MSE)

  15. Asthma action plan

    OpenAIRE

    Public Health Agency

    2014-01-01

    This action plans allow each child (or parent/carer) to record his or her asthma treatment to help manage their asthma when they are well, when their symptoms get worse and when they are suffering an asthma attack.

  16. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... we are What we do Programs and activities Work with us Contact Us Blog Popular topics Vision ... Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Breastfeeding myths in ...

  17. Planning Through Incrementalism

    Science.gov (United States)

    Lasserre, Ph.

    1974-01-01

    An incremental model of decisionmaking is discussed and compared with the Comprehensive Rational Approach. A model of reconciliation between the two approaches is proposed, and examples are given in the field of economic development and educational planning. (Author/DN)

  18. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Get help with family planning Get help with mental health Find girls' health information Stay Connected ... the Call, Don't Miss a Beat National Women and Girls HIV/AIDS Awareness Day National Women's ...

  19. Succession planning : phase II.

    Science.gov (United States)

    2008-06-01

    Succession planning is an organizational investment in the future. Institutional : knowledge is a critical ingredient in the culture of an organization, and its intangible : value becomes significant when an organization is faced with the need to pas...

  20. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... into your life Breastfeeding in daily life: At home and in public Laws that support breastfeeding 10 ... and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural ...

  1. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  2. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  3. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Get help with family planning Get help with mental health Find girls' health information Stay ... Women and Girls HIV/AIDS Awareness Day National Women's Health Week Supporting Nursing Moms ...

  4. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding support Fitting breastfeeding into your life Partner resources Subscribe To receive Breastfeeding email updates ...

  5. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Get help with family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media inquiries Social media About Us Who we are What we ...

  6. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  7. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media inquiries Social media About Us Who we are What we ...

  8. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  9. Family planning education.

    Science.gov (United States)

    Hamburg, M V

    1983-02-01

    17 days were spent devoted to the effort of learning about China's educational approach to family planning in the hope of discovering how they are achieving their remarkable success in reducing population growth. As a member of the 1981 New York University/SIECUS Colloquim in China, it was necessary to rely on the translation provided by the excellent guides. Discussions were focused on questions prepared in advance about the topics that concerned the group. These observations, based on a short and limited exposure, cover the following areas: marriage and family planning policies; the family planning program; school programs; adult education; family planning workers; and unique aspects of the program. China has an official position on marriage and family planning that continues to undergo revisions. The new marriage law sets the minimum ages of marriage at 22 for men and 20 for women. Almost everyone marries, and an unmarried person over age 28 is a rarity. The family planning program in China is carried out by an extensive organizational network at national, provincial, and local government levels. Officials termed it a "propaganda campaign." Hospitals, clinics, and factories invariably displayed posters; a popular set of four presents the advantages of the 1 child family as follows: late marriage is best, for it allows more time to work and study; 1 child is best for the health of the mother; one gets free medical care for his/her child if a family has only 1 child; and there is more time to teach 1 child. The state operated television regularly explains the 1 child policy utilizing special films. According to 1 family planning official, "before marriage there is little sex." There are few abortions for unmarried women. Education about sex is for adults, for those persons who are about to be married. There is little if any sex education in schools. Sexual teaching is not generally acceptable, especially in the rural areas. By contrast, in Shanghai the physiology

  10. Oncentra brachytherapy planning system.

    Science.gov (United States)

    Yang, Jack

    2018-03-27

    In modern cancer management, treatment planning has progressed as a contemporary tool with all the advances in computing power in recent years. One of the advanced planning tools uses 3-dimensional (3D) data sets for accurate dose distributions in patient prescription. Among these planning processes, brachytherapy has been a very important part of a successful cancer management program, offering clinical benefits with specific or combined treatments with external beam therapy. In this chapter, we mainly discussed the Elekta Oncentra planning system, which is the main treatment planning tool for high-dose rate (HDR) modality in our facility and in many other facilities in the United States. HDR is a technically advanced form of brachytherapy; a high-intensity radiation source (3.6 mm in length) is delivered with step motor in submillimeter precision under computer guidance directly into the tumor areas while minimizing injury to surrounding normal healthy tissue. Oncentra planning is the key component to generate a deliverable brachytherapy procedure, which is executed on the microSelectron V3 remote afterloader treatment system. Creating a highly conformal plan can be a time-consuming task. The development of Oncentra software (version 4.5.3) offers a variety of useful tools that facilitate many of the clinical challenging tasks for planning, such as contouring and image reconstruction, as well as rapid planning calculations with dose and dose volume histogram analysis. Oncentra Brachy module creates workflow and optimizes the planning accuracy for wide varieties of clinical HDR treatments, such as skin, gynecologic (GYN), breast, prostate, and many other applications. The treatment file can also be transferred to the afterloader control station for speedy delivery. The design concept, calculation algorithms, and optimization modules presented some key characteristics to plan and treat the patients effectively and accurately. The dose distribution and accuracy of

  11. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  12. NRPB corporate plan

    International Nuclear Information System (INIS)

    Clarke, Roger

    1995-01-01

    As with all non-departmental public bodies, the National Radiological Protection Board is required to prepare a Corporate Plan each year. The Plan for 1995/1996 to 1999/2000 is now available as a Board report; extracts from the introductory section are given here. They deal with the Board's statutory duty to provide advice and conduct research and with its power to provide services, all in relation to ionising and non-ionising radiations. (author)

  13. WIPP documentation plan

    International Nuclear Information System (INIS)

    Plung, D.L.; Montgomery, T.T.; Glasstetter, S.R.

    1986-01-01

    In support of the programs at the Waste Isolation Pilot Plant (WIPP), the Publications and Procedures Section developed a documentation plan that provides an integrated document hierarchy; further, this plan affords several unique features: 1) the format for procedures minimizes the writing responsibilities of the technical staff and maximizes use of the writing and editing staff; 2) review cycles have been structured to expedite the processing of documents; and 3) the numbers of documents needed to support the program have been appreciably reduced

  14. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  15. AUDIT plan documenting method

    International Nuclear Information System (INIS)

    Cornecsu, M.

    1995-01-01

    The work describes a method of documenting the AUDIT plan upon the basis of two quantitative elements resulting from quality assurance program appraisal system function implementation degree as established from the latest AUDIT performed an system function weight in QAP, respectively, appraised by taking into account their significance for the activities that are to be performed in the period for which the AUDITs are planned. (Author) 3 Figs., 2 Refs

  16. Management of Logistics Planning

    OpenAIRE

    Bjørnar Aas; Stein W. Wallace

    2010-01-01

    Logistics problems are gradually becoming more complex and a better understanding of logistics management as a subject is a key to deal with the new challenges. A core element of logistics management is logistics planning, which substitutes for low customer service levels, high waste, and the use of buffers and slacks in the execution of logistic activities. Furthermore, the availability of information and problem-solving capabilities are established as the core parts of logistics planning. B...

  17. Factor 4 planning

    International Nuclear Information System (INIS)

    Bariol-Mathais, Brigitte; Lavoillotte, Philippine; Gall-Sorrentino, Florence; Malez, Marianne; Sanna, Daniela; Marsauche, Maud; Marquet, Sarah; Debergue, Sophie; Aminu, Olufunmi; Bernard, Helene; Marchand, Jean-Michel; Blin, Frederic; Grange, Jerome; Caillierez, Sophie; Muller, Dania; Clement, Bob; Desire, Jean-Charles; Metais, Benedicte; Lannuzel, Philippe; Pezet-Kuhn, Murielle; Pons, Anne; Rivoire-Meley, Benedicte; Tissot, Heloise

    2015-07-01

    Factor 4 is the goal of cutting our greenhouse gas emissions by 75% by 2050. Achieving this objective will necessitate radical changes in our practices, in particular concerning transport and housing; the measures currently implemented, such as positive-energy buildings, low-impact mobility and eco-neighbourhoods, will not be enough to meet this goal. These measures must be conceived in the framework of broad territorial planning that integrates environmental and energy objectives far upstream. To this end, the French Environment and Energy Management Agency (ADEME) and the French network of Urban Planning Agencies (FNAU), pursuing their missions in their respective areas of competence, have joined forces to make infrastructure and land use planning an integral part of the environmental and energy transition process. In 2013, the two organisations signed a partnership agreement and compiled an inventory of practices that are relevant to Factor 4 planning. This work was led by Epures, Saint-etienne urban planning agency, along with FNAU, drawing upon the expertise of a dozen urban planning agencies in precursor territories. This inventory describes the stakes, resources and strengths for each territory, which have led to cross-sectoral territorial planning exercises with ambitious environmental and energy objectives; the importance of evaluation in attaining these goals is emphasised. Current experience, questions and available methodological tools are summarised in this document, to encourage territories and help them design their planning policies along a trajectory to achieve Factor 4 goals. The compilation also aims to be a contribution to the COP21 climate conference

  18. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  19. SCENARIO PLANNING AS LEARNING

    Directory of Open Access Journals (Sweden)

    Antonio Lourenço Junior

    2010-10-01

    Full Text Available Scenario Planning has been increasingly used, from its introduction to the decision process as effective tools to test decisions, and improve performance in a dynamic environment (Chermack, 2005. The purpose of this article is to demonstrate the potential of an experimental Scenario Planning Model to mobilize, encourage and add more content to the organization’s decision making process – mainly with respect to Strategic Plans of two governmental institutions, a pharmaceutical company and a technology education foundation.  This study describes the application stages of a hybrid scenario-planning model – herein referred to as Planning as Learning – via action-research, showing the scenarios resulting from the experiment and describes the main results of an assessment of such practice. In order to do that, two well-established Scenario Planning models (Prospective school and Shell’s model were analyzed. They were used as a reference for the proposition and application of an experimental model in the two study objects. A questionnaire was used to assess the technique impact. It was possible to obtain high levels of reliability. In-depth interviews were also conducted with the participants. At the end, the results confirmed the model efficiency as a basis for decision making in the competitive environment in which the two institutions are inserted, also to encourage the learning process as a group, as observed throughout the work.

  20. Strategic planning for marketers.

    Science.gov (United States)

    Wilson, I

    1978-12-01

    The merits of strategic planning as a marketing tool are discussed in this article which takes the view that although marketers claim to be future-oriented, they focus too little attention on long-term planning and forecasting. Strategic planning, as defined by these authors, usually encompasses periods of between five and twenty-five years and places less emphasis on the past as an absolute predictor of the future. It takes a more probabilistic view of the future than conventional marketing strategy and looks at the corporation as but one component interacting with the total environment. Inputs are examined in terms of environmental, social, political, technological and economic importance. Because of its futuristic orientation, an important tenant of strategic planning is the preparation of several alternative scenarios ranging from most to least likely. By planning for a wide-range of future market conditions, a corporation is more able to be flexible by anticipating the course of future events, and is less likely to become a captive reactor--as the authors believe is now the case. An example of strategic planning at General Elecric is cited.

  1. Computerized radiation treatment planning

    International Nuclear Information System (INIS)

    Laarse, R. van der.

    1981-01-01

    Following a general introduction, a chain consisting of three computer programs which has been developed for treatment planning of external beam radiotherapy without manual intervention is described. New score functions used for determination of optimal incidence directions are presented and the calculation of the position of the isocentre for each optimum combination of incidence directions is explained. A description of how a set of applicators, covering fields with dimensions of 4 to 20 cm, for the 6 to 20 MeV electron beams of a MEL SL75-20 linear accelerator was developed, is given. A computer program for three dimensional electron beam treatment planning is presented. A microprocessor based treatment planning system for the Selectron remote controlled afterloading system for intracavitary radiotherapy is described. The main differences in treatment planning procedures for external beam therapy with neutrons instead of photons is discussed. A microprocessor based densitometer for plotting isodensity lines in film dosimetry is described. A computer program for dose planning of brachytherapy is presented. Finally a general discussion about the different aspects of computerized treatment planning as presented in this thesis is given. (Auth.)

  2. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  3. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  4. Site 300 SPCC Plan

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-11-23

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

  5. Your cancer survivorship care plan

    Science.gov (United States)

    ... ency/patientinstructions/000822.htm Your cancer survivorship care plan To use the sharing features on this page, ... get one. What Is a Cancer Survivorship Care Plan? A cancer survivorship care plan is a document ...

  6. Single-employer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active single-employer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  7. 2008 Enterprise Transition Plan (ETP)

    National Research Council Canada - National Science Library

    England, Gordon

    2008-01-01

    The Enterprise Transition Plan (ETP) is the Department of Defense's integrated business transformation plan, which incorporates the transition plans of the Military Services, Components and the DoD Enterprise...

  8. Path planning in changeable environments

    NARCIS (Netherlands)

    Nieuwenhuisen, D.

    2007-01-01

    This thesis addresses path planning in changeable environments. In contrast to traditional path planning that deals with static environments, in changeable environments objects are allowed to change their configurations over time. In many cases, path planning algorithms must facilitate quick

  9. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  10. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  11. Strategic planning: the first step in the planning process.

    Science.gov (United States)

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  12. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    Directory of Open Access Journals (Sweden)

    Humphrey Tonkin

    2015-04-01

    Full Text Available The field of language planning (LP has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster suggests that planned languages (what Wüster calls Plansprache might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, and occasionally more international and cosmopolitan. Zamenhof's work on Esperanto provides extensive material, little studied, documenting the formation of the language and linking it particularly to issues of supranational LP. Defining LP decision-making, Kaplan & Baldauf begin with context and target population. Zamenhof's Esperanto came shortly before Ben-Yehuda's revived Hebrew. His target community was (mostly the world's educated elite; Ben-Yehuda's was worldwide Jewry. Both planners were driven not by linguistic interest but by sociopolitical ideology rooted in reaction to anti-Semitism and imbued with the idea of progress. Their territories had no boundaries, but were not imaginary. Function mattered as much as form (Haugen's terms, status as much as corpus. For Zamenhof, status planning involved emphasis on Esperanto's ownership by its community - a collective planning process embracing all speakers (cf. Hebrew. Corpus planning included a standardized European semantics, lexical selectivity based not simply on standardization but on representation, and the development of written, and literary, style. Esperanto was successful as linguistic system and community language, less as generally accepted lingua franca. Its terminology development and language cultivation offers a model for language revival, but Zamenhof's somewhat limited analysis of language economy left him unprepared to deal with language as power.

  13. Whooping crane recovery plan

    Science.gov (United States)

    Olsen, David L.; Blankenship, David R.; Irby, Harold D.; Erickson, Ray C.; Lock, Ross; Drewien, Roderick C.; Smith, Lawrence S.; Derrickson, Scott R.

    1980-01-01

    This plan has been prepared under the authority of the Endangered Species Act of 1973 and subsequent amendments. The Plan is designed to provide decision makers with an orderly set of events which, if carried out to a successful completion, will result in changing the status of the species from the endangered to the threatened level. It must be recognized that this Plan has been prepared 40 years after attempts to preserve the species began. As such, it covers events that have taken place, that are taking place, and that need to take place. The Plan, therefore, not only compiles in one place all whooping crane management and research efforts which are underway, but also proposes additional efforts needed for the recovery of the whooping crane. The Plan also establishes funding evels, time schedules, and priorities for each management and research effort.The Plan is organized into three parts. the first part includes an account of the whooping crane's history, biology, present status, and the factors believed to have resulted in its endangered status. Also included in this part is a synopsis of research and management activities that have taken place through 1978.The second part is a step-down pan wherein all existing and needed research and management efforts are organized into an orderly set of events. The prime objective is to move the whooping crane to non-endangered status. Minimum requirements for the attainment of this objective are the increase of the historical Wood Buffalo-Aransas population to at least 40 nesting pairs and the establishment of at least two additional, separate, and self-sustaining populations consisting of at least 20 nesting pairs each.the third part identifies the responsibility, time schedule, and cost for each element of the step-down plan.

  14. Attitudes toward family planning.

    Science.gov (United States)

    Gille, H

    1984-06-01

    Many of the 135 countries participating in the 1974 UN World Population Conference were far from accepting the basic human right to decide freely and responsibly the number and spacing of their children and to have the information, education, and means to do so. Considerable progress has been made since then, and the number of developing countries that provide direct government support for family planning has increased to over 60%. Many have liberalized laws and regulations which restricted access to modern contraceptive methods, and a growing number provide family planning services within their health care programs. A few have recognized the practice of family planning as a constitutional right. In late 1983 at the Second African Population Conference, recognition of family as a human right was strongly contested by several governments, particularly those of West Africa. in developed countries most of the women at risk of unwanted pregnancy are using contraceptives. Of the major developing regions the highest use level is in Latin America, wherein most countries 1/3 to 1/2 of married women are users. Levels in Asian countries range from up to 10% in Afghanistan, Nepal, and Pakistan to up to 40% in the southeastern countries. China, a special case, now probably exceeds an overall use level of 2/3 of married women. Contraceptive use is lowest in Africa. There is room for improvement even among many of the successful family planning programs, as access to contraceptives usually is not sufficient to overcome limiting factors. To ensure the individual's free choice and strengthen the acceptability and practice of family planning, all available methods should be provided in service programs and inluded in information and education activities. Family planning programs should engage local community groups, including voluntary organizations, in all aspects of planning, management, and allocation of resources. At the government level a clear political commitment to family

  15. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  16. PLANNING NATIONAL RADIOTHERAPY SERVICES

    Directory of Open Access Journals (Sweden)

    Eduardo eRosenblatt

    2014-11-01

    Full Text Available Countries, states and island nations often need forward planning of their radiotherapy services driven by different motives. Countries without radiotherapy services sponsor patients to receive radiotherapy abroad. They often engage professionals for a feasibility study in order to establish whether it would be more cost-beneficial to establish a radiotherapy facility. Countries where radiotherapy services have developed without any central planning, find themselves in situations where many of the available centres are private and thus inaccessible for a majority of patients with limited resources. Government may decide to plan ahead when a significant exodus of cancer patients travel to another country for treatment, thus exposing the failure of the country to provide this medical service for its citizens. In developed countries the trigger has been the existence of highly visible waiting lists for radiotherapy revealing a shortage of radiotherapy equipment.This paper suggests that there should be a systematic and comprehensive process of long-term planning of radiotherapy services at the national level, taking into account the regulatory infrastructure for radiation protection, planning of centres, equipment, staff, education pr

  17. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  18. Draft Transportation Institutional Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab

  19. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  20. Egypt boosts family planning.

    Science.gov (United States)

    1977-10-27

    A $4 million Agency for International Development (AID) agreement was signed in Cairo September 30 which will help the Egyptian government increase family planning services. The project is in response to a request for up to $17 million of AID funds for family planning programs during the next 3 years. The funds will pay for: contract advisors to provide short-term in-country training of physicians, architectural and engineering services to renovate a hospital for family planning and obstetrics/gynecology training, and a field training site for family planning service providers. Some Egyptians will receive training in specialized areas in the U.S. and other countries. More than $1.5 million of the $4 million will finance local costs of goods and services required. In addition, it is anticipated that U.S.-owned local currencies will be obligated for direct support of U.S. technical personnel. Over the 3-year life of the project the $17 million from AID plus $664,000 of U.S.-owned local currency will cover 44% of the total costs of selected Egyptian family planning activities. The Egyptian government will contribute at least $18.4 million and the U.N. Fund for Population Activities and the International Bank for Reconstruction and Development will contribute $4.3 million.

  1. Annual plan, December 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This annual plan is being provided as required under Section 'D' of the Alberta Energy and Utilities Board Information Letter IL 90-8. The objective is to provide the Board, NOVA Gas Transmission (NGTL) customers and other interested parties with a comprehensive overview of NOVA Gas Transmission's pipeline system expansion plans for the gas year 2000/ 2001, and the winter season of the 2001/2002 gas year. The plan includes descriptions of NGTL's design assumptions and criteria, as well as long term outlook for field deliverability, productive capability, gas deliveries, proposed facility additions, capital expenditures, revenue requirements and firm service demand rates. Major factors affecting the facility requirements for the period under consideration are a decrease in the maximum day delivery volume at the Empress border point, an increase in intra-Alberta maximum day delivery volumes and associated decline in productive capability. Chapter One of the Plan describes the the Annual Plan process itself; Chapter Two is devoted to a discussion of facilities design methodology; Chapter Three deals with economic assumptions; Chapter Four describes design flow, while Chapters Five and Six outline the mainline , meter stations, laterals, and lateral loops facility requirements. Chapter Seven provides and overview of the capital and financial forecasts. tabs., figs.

  2. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  3. Public Information Plan

    International Nuclear Information System (INIS)

    1984-06-01

    The Public Information Plan is intended to be used in conjunction with the DOE-UMTRA Project ''Public Participation Plan'' to describe the Department of Energy's plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control of Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites. The objective of the Public Information Plan of the UMTRA Project is timely and sufficient dissemination of factual information to promote understanding of the project by federal, state, and local officials, the media, special interest groups, and the general public; and thereby to encourage informed participation in the project by the public and government officials. The Uranium Mill Tailings Radiation Control Act provides for public involvement in remedial action planning, with special consideration given to landowners, Indian tribes, and the states. According to the Act, the Secretary of Energy shall hold public hearings in the states where processing sites, vicinity properties, and disposal sites are located. Public participation in the UMTRA Project will not, however, be limited to those mechanisms formally required by law. The public may also be involved informally through informational meetings, workshops, and local citizens' task forces. 12 refs., 2 figs., 1 tab

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  5. Planned Positron Factory project

    International Nuclear Information System (INIS)

    Okada, Sohei

    1990-01-01

    The Japan Atomic Energy Research Institute, JAERI, has started, drafting a construction plan for the 'Positron Factory', in which intense energy-controllable monoenergetic positron beams are produced from pair-production reactions caused by high-energy electrons from a linac. The JAERI organized a planning committee to provide a basic picture for the Positron Factory. This article presents an overview of the interactions of positrons, intense positron sources and the research program and facilities planned for the project. The interactions of positrons and intense positron sources are discussed focusing on major characteristics of positrons in different energy ranges. The research program for the Positron Factory is then outlined, focusing on advanced positron annihilation techniques, positron spectroscopy (diffraction, scattering, channeling, microscopy), basic positron physics (exotic particle science), and positron beam technology. Discussion is also made of facilities required for the Positron Factory. (N.K.)

  6. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  7. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  8. Energy and urban planning

    DEFF Research Database (Denmark)

    Fertner, Christian

    How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from the interna......How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from...... the international EU-FP7 project PLEEC (‘Planning for energy efficient cities’, 2013-2016) and spin-off projects list options and challenges....

  9. Educational program emergency planning.

    Science.gov (United States)

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  10. Fractional factorial plans

    CERN Document Server

    Dey, Aloke

    2009-01-01

    A one-stop reference to fractional factorials and related orthogonal arrays.Presenting one of the most dynamic areas of statistical research, this book offers a systematic, rigorous, and up-to-date treatment of fractional factorial designs and related combinatorial mathematics. Leading statisticians Aloke Dey and Rahul Mukerjee consolidate vast amounts of material from the professional literature--expertly weaving fractional replication, orthogonal arrays, and optimality aspects. They develop the basic theory of fractional factorials using the calculus of factorial arrangements, thereby providing a unified approach to the study of fractional factorial plans. An indispensable guide for statisticians in research and industry as well as for graduate students, Fractional Factorial Plans features: * Construction procedures of symmetric and asymmetric orthogonal arrays. * Many up-to-date research results on nonexistence. * A chapter on optimal fractional factorials not based on orthogonal arrays. * Trend-free plans...

  11. Flood action plans

    International Nuclear Information System (INIS)

    Slopek, R.J.

    1995-01-01

    Safe operating procedures developed by TransAlta Utilities for dealing with flooding, resulting from upstream dam failures or extreme rainfalls, were presented. Several operating curves developed by Monenco AGRA were described, among them the No Overtopping Curve (NOC), the Safe Filling Curve (SFC), the No Spill Curve (NSC) and the Guaranteed Fill Curve (GFC). The concept of an operational comfort zone was developed and defined. A flood action plan for all operating staff was created as a guide in case of a flooding incident. Staging of a flood action plan workshop was described. Dam break scenarios pertinent to the Bow River were developed for subsequent incorporation into a Flood Action Plan Manual. Evaluation of the technical presentations made during workshops were found them to have been effective in providing operating staff with a better understanding of the procedures that they would perform in an emergency. 8 figs

  12. Fra Plan til Undervisning

    DEFF Research Database (Denmark)

    Ingerslev, Gitte Holten; Svejgaard, Karin; Madsen, Anne-Grethe

    Fra plan til undervisningspraksis ? en evaluering af fagligt samspil Resumé: Fra plan til undervisning er en rapport fra et evalueringsprojekt finansieret af undervisningsministeriets midler til udviklingsarbejde og forsøg på de gymnasiale uddannelser. Projektet er gennemført af et konsortium...... fremstilles i rapporten Fra plan til Undervisning som tre cases. Casene indeholder en del fællestræk, da skolernes arbejde med fagligt samspil udspringer af en række fælles erfaringer og træk ved undervisningskulturen på htx. Det gælder først og fremmest det forhold, at fagligt samspil knyttes sammen med de...

  13. Continual improvement plan

    Science.gov (United States)

    1994-01-01

    NASA's approach to continual improvement (CI) is a systems-oriented, agency-wide approach that builds on the past accomplishments of NASA Headquarters and its field installations and helps achieve NASA's vision, mission, and values. The NASA of the future will fully use the principles of continual improvement in every aspect of its operations. This NASA CI plan defines a systematic approach and a model for continual improvement throughout NASA, stressing systems integration and optimization. It demonstrates NASA's constancy of purpose for improvement - a consistent vision of NASA as a worldwide leader in top-quality science, technology, and management practices. The CI plan provides the rationale, structures, methods, and steps, and it defines NASA's short term (1-year) objectives for improvement. The CI plan presents the deployment strategies necessary for cascading the goals and objectives throughout the agency. It also provides guidance on implementing continual improvement with participation from top leadership and all levels of employees.

  14. Tourism and Strategic Planning

    DEFF Research Database (Denmark)

    Pasgaard, Jens Christian

    2012-01-01

    the potential of ‘the extraordinary’ tourism-dominated space. As highlighted in the introduction, this report does not present any systematic analysis of strategic planning processes; neither does it provide any unequivocal conclusions. Rather, the report presents a collection of so-called ‘detours......The main purpose of this report is to explore and unfold the complexity of the tourism phenomenon in order to qualify the general discussion of tourism-related planning challenges. Throughout the report I aim to demonstrate the strategic potential of tourism in a wider sense and more specifically......’ – a collection of theoretical discussions and case studies with the aim to inspire future strategic planning. Due to the complexity and heterogeneity of the phenomenon I use a non-linear and non-chronological report format with the ambition to create a new type of overview. In this regard the report is intended...

  15. NASA strategic plan

    Science.gov (United States)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  16. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  17. Test plans for availability

    International Nuclear Information System (INIS)

    Rise, J.L.; Bjoerklund, O.

    1978-12-01

    In this work is developed principles for statistical test plans for availability compliance tests. Failure terminated and time terminated fixed size plans are considered as well as sequential test plans without and with failure and time truncation. The suggested methods are evaluated with respect to some important characteristics, namely the average number of failures to termination, the duration of the test and the operating characteristic function. The methods used are based on the assumption that up- and down-times can be considered gamma distributed. Simulation studies indicate that the methods are robust against reasonable deviations in distribution assumptions for the down-times. In the work is also outlined technical conditions and prerequisites applicable to availability compliance tests in general. The approach choosen seems very promising and is worth further development. It is based on the same fundamental principles as present is used in International standardization of equipment reliability testing. (author)

  18. Optics Supply Planning System

    International Nuclear Information System (INIS)

    Gaylord, J.

    2009-01-01

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  19. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  20. Planning as situated design

    DEFF Research Database (Denmark)

    Axel, Erik

    It is common to associate situated activity with concrete, craftlike or manual activity here and now and to reserve theoretical and abstract thinking for activities like theoretical experimentation and systematic planning. Much work has gone into demonstrating that these activities are concrete...... and situated, too. In this presentation it will be argued that the investigation of systematic planning as conflictual cooperation will help us see that situated activity is not only based on the present conditions, but also relates them to events spread out in time and space, thereby opening up for another...... understanding of theoretical thinking. Some material from the empirical research project developed with Klaus Nielsen on the design and engineering of a house will be presented. On this basis a conception of planning will be unfolded. It will be understood differently from the way it is understood...

  1. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  2. Undecidability in Epistemic Planning

    DEFF Research Database (Denmark)

    Aucher, Guillaume; Bolander, Thomas

    2013-01-01

    at a price. The planning framework is undecidable, even if we allow only purely epistemic actions (actions that change only beliefs, not ontic facts). Undecidability holds already in the S5 setting with at least 2 agents, and even with 1 agent in S4. It shows that multi-agent planning is robustly undecidable......Dynamic epistemic logic (DEL) provides a very expressive framework for multi-agent planning that can deal with nondeterminism, partial observability, sensing actions, and arbitrary nesting of beliefs about other agents’ beliefs. However, as we show in this paper, this expressiveness comes...... if we assume that agents can reason with an arbitrary nesting of beliefs about beliefs. We also prove a corollary showing undecidability of the DEL model checking problem with the star operator on actions (iteration)....

  3. OCRWM's evolving strategic planning process and the 1990 plan

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Munro, J.F.; Champagne, D.L.

    1991-01-01

    In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the strategic planning process being adopted by one of those organizations, the Office of Civilian Radioactive Waste Management (OCRWM). Secretary Watkins also ordered a much-abbreviated planning cycle for 1990 to produce the first set of plans in September. That first plan for OCRWM is also discussed here

  4. Corporate plan 1989

    International Nuclear Information System (INIS)

    1988-12-01

    The paper presents the United Kingdom Science and Engineering Research Council's second Corporate Plan 1989. The Corporate Plan comprises statements of the current objectives of the Astronomy and Planetary Science Board, the Engineering Board, the Nuclear Physics Board, the Atmospheric Sciences and Computing Centre, along with a discussion of the mechanisms for their attainment. The Annex contains a description of some scientific highlights between 1985-1989, as well as a review of progress between 1984-5 to 1987-8. (U.K.)

  5. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  6. Marketing Plan: Tukkanuotta Rauma

    OpenAIRE

    Hyrsky, Antti

    2012-01-01

    The purpose of this thesis was to make a marketing plan and a brand new website for a hair saloon. The marketing plan is based on the 7p’s of the extended or service marketing mix. The emphasis is on the parts of promotion and price. The thesis outlines the theory of marketing mix and applies it to the case. The second part of the thesis is a new website. The website was done using Joomla! 1.7 content management system. This platform was selected in order to make future updating and m...

  7. GTRgaz: investment plan

    International Nuclear Information System (INIS)

    Anon.

    2007-01-01

    GTRgaz company published on June 2007 its indicative development plan for the 10 years to come. This document serves as a communication vector between GTRgaz and the actors of the market and presents the projects of development of the gas transportation network as defined on the basis of the evolution of French and European markets, and on the knowledge of capacity needs directly or indirectly expressed by the suppliers community. This article summarizes the different points of this plan: reduction of the number of balancing points, development of interconnection capacities, development of output capacities, network free interplay improvement beyond 2013. (J.S.)

  8. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  9. Guam Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  10. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  11. Limerick Clare Energy Plan

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Dubuisson, Xavier

    2012-01-01

    at a national level, but they need to be supplemented by local plans also, since the most successful renewable energy projects to date are at a local level. For example, it is evident from the transition to renewable energy in Denmark, that 100% renewable energy systems can already be implemented at a local...... level. Hence, by initiating local action, national targets can be met and exceeded, while also creating a template for a wider transition to renewable energy. Accordingly, the primary goal of the project is: To develop a local energy plan for Limerick and Clare which is based on a quantified assessment...

  12. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  13. Completion of treatment planning

    International Nuclear Information System (INIS)

    Lief, Eugene

    2008-01-01

    The outline of the lecture included the following topics: entering prescription; plan printout; print and transfer DDR; segment BEV; export to R and V; physician approval; and second check. Considerable attention, analysis and discussion. The summary is as follows: Treatment planning completion is a very responsible process which requires maximum attention; Should be independently checked by the planner, physicist, radiation oncologist and a therapist; Should not be done in a last minute rush; Proper communication between team members; Properly set procedure should prevent propagation of an error by one individual to the treatment: the error should be caught by somebody else. (P.A.)

  14. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  15. Planning of irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Caha, A; Krystof, V [Vyzkumny Ustav Klinicke a Experimentalni Onkologie, Brno (Czechoslovakia)

    1979-07-01

    The principles are discussed of the planning of irradiation, ie., the use of the various methods of location of a pathological focus and the possibility of semiautomatic transmission of the obtained data on a two-dimensional or spatial model. An efficient equipment is proposed for large irradiation centres which should cooperate with smaller irradiation departments for which also a range of apparatus is proposed. Irradiation planning currently applied at the Research Institute of Clinical and Experimental Oncology in Brno is described. In conclusion, some of the construction principles of semi-automatic operation of radiotherapy departments are discussed.

  16. Business Plan for Nordfix

    OpenAIRE

    Stoyanov, Bogomil

    2015-01-01

    The purpose of this thesis is to create a partial business plan with the intended reader being a potential investor. Due to various reasons the creation of a complete business plan was not possible. The commissioning company for this thesis is Nordfix, in which I am the co-founder of. We operate in the IT-field, and more specifically in the maintenance and repairs of smart devices like smart phones, tablets or laptops. The business began operating in December 2013 from my home. With the ...

  17. Retirement Planning the Easy Way.

    Science.gov (United States)

    Fields, Cheryl D.

    1996-01-01

    Options available to college faculty for planning their retirement benefits are described, including defined benefit plans, defined contribution plans, and methods for customizing a pension plan. Data for 1993 on American households owning interest-earning assets (passbook savings, money market deposit accounts, certificates of deposit, checking…

  18. Diagnosis of plan structure Violations

    NARCIS (Netherlands)

    Roos, Nico

    2007-01-01

    Failures in plan execution can be attributed to errors in the execution of plan steps or violations of the plan structure. The structure of a plan prescribes which actions have to be performed and which precedence constraints between them have to be respected. Especially in multi-agent environments

  19. Develop a Professional Learning Plan

    Science.gov (United States)

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  20. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  1. Complexity Results in Epistemic Planning

    DEFF Research Database (Denmark)

    Bolander, Thomas; Jensen, Martin Holm; Schwarzentruber, Francois

    2015-01-01

    Epistemic planning is a very expressive framework that extends automated planning by the incorporation of dynamic epistemic logic (DEL). We provide complexity results on the plan existence problem for multi-agent planning tasks, focusing on purely epistemic actions with propositional preconditions...

  2. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  3. TVET Planning and Development

    NARCIS (Netherlands)

    Dr. J. Onstenk

    2014-01-01

    There are changes in society and labour market demands made to TVET and in the TVET system itself. To deal with both types of challenges, the aim for TVET planning and development is to anticipate how employment will evolve and to determine how to give individuals a knowledge base that will enable

  4. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  5. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... is the best time to learn about the benefits of breastfeeding and make plans to give your baby a healthy start in life. Expand the sections below to watch videos about breastfeeding and ... href="https://www.youtube-nocookie.com/embed/ge-2Cn-LRAE">https://www.youtube- ...

  6. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  7. Planning for Growth.

    Science.gov (United States)

    Astle, Judy Hughes

    2001-01-01

    A summer camp expanded into year-round operation one step at a time. Initial steps included identifying the camp mission, history, and assets. Successive steps became larger and included expanding the program within the mission, increasing marketing efforts, developing natural resources, creating plans for maintenance and improvements, and…

  8. RPII Action Plan

    International Nuclear Information System (INIS)

    2011-03-01

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  9. Chemical hygiene plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan was written to administer and monitor safety measures and chemical hygiene principles in the TAC Uranium Mill Tailing Remedial Action Project sample preparation facility in Albuquerque, New Mexico. It applies to toxic and/or hazardous materials to radioactive materials

  10. Brothers Grimm. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Grimm's fairy tales, this lesson plan presents activities designed to help students understand that fairy tales connect them to earlier generations, help them think about present situations, that magic figures prominently in fairy tales, and that fairy tales can inspire readers to create original works of art. The main activity in the…

  11. Impacted material placement plans

    International Nuclear Information System (INIS)

    Hickey, M.J.

    1997-01-01

    Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility

  12. BNL accelerator plans

    International Nuclear Information System (INIS)

    Lowenstein, D.I.

    1986-01-01

    The Brookhaven National Laboratory plan for high energy and heavy ion physics accelerator use for the next ten-year period is described. The two major initiatives are in the construction of the Relativistic Heavy Ion Collider and the upgrade of the Alternating Gradient Synchrotron to a ''Mini Kaon Factory''

  13. Vision, Plan and Reality

    DEFF Research Database (Denmark)

    Steinø, Nicolai

    , the theoretical study is organized as a threefold investigation of urban design theory, planning theory, as well as urban theory. As urban design in practice must consider what the built environment should be like as well as how it is developed, it must include normative as well as procedural considerations. Thus...

  14. Wind farms and planning

    International Nuclear Information System (INIS)

    Arkesteijn, L.; Havinga, R.; Benner, J.H.B.

    1992-01-01

    The siting of wind farms is becoming an increasingly important issue in the Netherlands. This paper gives an overview of the current situation concerning the planning of wind farms. We will pay attention to: Wind energy in official Dutch planning policy. To select the optimal sites, the government has made an administrative agreement with the 7 windy provinces. Nevertheless, wind energy is still fighting for a rightful position in physical planning policy. Some examples will illustrate this. Studies on siting and siting problems in the Netherlands. In order to gain more insight into aspects of wind farming several studies have been executed. In this paper special attention will be paid to the results of a study on the potential impact of large windturbine clusters on an existing agricutural area. Experiences with siting of wind farms in the Netherlands. Based on experiences with the planning and realization of farms, this paper gives the main problems. In the final part of the paper we present some general conclusions. Generally speaking, the knowledge is available for selecting optimal sites in the Netherlands. The basic problems for wind farming nowadays seem to be the visual impact and actually obtaining the ground. Nevertheless, there do seem to be enough sites for realizing the goals in the Netherlands. (au)

  15. Major planning enquiries

    Energy Technology Data Exchange (ETDEWEB)

    Shore, P

    1978-11-01

    This is a speech delivered by the U.K. Secretary of State for the Environment in Manchester (UK) on September 13th 1978. It outlines the Minister's views on the role and significance of major planning inquiries - such as that proposed to be held on the Commercial Demonstration Fast Reactor. (CDFR) (author).

  16. NASA Technology Plan 1998

    Science.gov (United States)

    1998-01-01

    This NASA Strategic Plan describes an ambitious, exciting vision for the Agency across all its Strategic Enterprises that addresses a series of fundamental questions of science and research. This vision is so challenging that it literally depends on the success of an aggressive, cutting-edge advanced technology development program. The objective of this plan is to describe the NASA-wide technology program in a manner that provides not only the content of ongoing and planned activities, but also the rationale and justification for these activities in the context of NASA's future needs. The scope of this plan is Agencywide, and it includes technology investments to support all major space and aeronautics program areas, but particular emphasis is placed on longer term strategic technology efforts that will have broad impact across the spectrum of NASA activities and perhaps beyond. Our goal is to broaden the understanding of NASA technology programs and to encourage greater participation from outside the Agency. By relating technology goals to anticipated mission needs, we hope to stimulate additional innovative approaches to technology challenges and promote more cooperative programs with partners outside NASA who share common goals. We also believe that this will increase the transfer of NASA-sponsored technology into nonaerospace applications, resulting in an even greater return on the investment in NASA.

  17. Interactive environmental planning

    DEFF Research Database (Denmark)

    Freudendal-Pedersen, Malene; Hartmann-Petersen, Katrine; Kjærulff, Aslak A.

    2017-01-01

    This article presents a research project on mobility management in Danish municipalities aimed at creating more sustainable mobilities. The project, called Formula M (2011–2014), worked within sciences, public and private sectors, and civil society. Often contemporary projects in both planning an...

  18. PNNL Campus Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  19. Magnetic Fusion Program Plan

    International Nuclear Information System (INIS)

    1985-02-01

    This Plan reflects the present conditions of the energy situation and is consistent with national priorities for the support of basic and applied research. It is realistic in taking advantage of the technical position that the United States has already established in fusion research to make cost-effective progress toward the development of fusion power as a future energy option

  20. Resources | Energy Plan

    Science.gov (United States)

    Skip to main content Navigate Up This page location is: Department for Energy Development and Independence Department for Energy Development and Independence Resources Pages EnergyPlan Sign In Ky.gov An Official Website of the Commonwealth of Kentucky Energy and Environment Cabinet Department for Energy

  1. Smart Start Evaluation Plan.

    Science.gov (United States)

    Bryant, Donna; Burchinal, Margaret; Buysse, Virginia; Kotch, Jonathan; Maxwell, Kelly; Neenan, Peter; Noblit, George; Orthner, Dennis; Peisner-Feinberg, Ellen; Telfair, Joseph

    Smart Start is North Carolina's partnership between state government and local leaders, service providers, and families to better serve children under 6 years of age and their families. This report describes the comprehensive plan to evaluate the state and local goals and objectives of the program, focusing on the components addressing the…

  2. ACNW - 1998 strategic plan

    International Nuclear Information System (INIS)

    1998-01-01

    This plan provides strategic direction to The Advisory Committee on Nuclear Waste (ACNW) in 1998 and beyond for focusing on issues most important to the NRC in carrying out its mission of protecting public health and safety, promoting the common defense and security, and protecting the environment

  3. Environmental Education Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  4. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Get help with family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media inquiries Social media About Us Who we are What we do Work with us Our vision and mission Programs and ...

  5. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  6. Paradoxes in planning

    NARCIS (Netherlands)

    van Wezel, W.M.C.; Jorna, R.J.J.M.

    The word 'planner' has two distinct meanings in literature. The first meaning refers to the profession of a human. Organizational processes must be planned so people know what work they are going to do. An example is a production planner in a factory. The second meaning of planner refers to an actor

  7. "Frankenstein." [Lesson Plan].

    Science.gov (United States)

    Simon, Melanie

    Based on Mary Shelley's novel "Frankenstein," this lesson plan presents activities designed to help students understand that active readers interpret a novel (its characters, plot, setting, and theme) in different ways; and the great literature can be and has been adapted in many ways over time. The main activity of the lesson involves students…

  8. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Popular Topics Autoimmune diseases Breastfeeding Carpal tunnel syndrome Depression HIV and AIDS Menstruation Polycystic ovary syndrome (PCOS) Pregnancy Thyroid disease All A-Z health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  9. Epistemic and Doxastic Planning

    DEFF Research Database (Denmark)

    Jensen, Martin Holm

    This thesis is concerned with planning and logic, which are both core areas of Artificial Intelligence (AI). A wide range of research disciplines deal with AI, including philosophy, economy, psychology, neuroscience, mathematics and computer science. The approach of this thesis is based...

  10. Planning for Accessibility.

    Science.gov (United States)

    Spoor, Dana L.

    1997-01-01

    Argues that barrier-free designs should be incorporated in the first steps of school facility planning to avoid the difficulties in meeting Americans with Disabilities Act (ADA) guidelines during renovations. Explains why not all barriers need be removed to make a facility accessible to everyone. Discusses issues involving ADA guidelines and child…

  11. Business Planning for Parenthood.

    Science.gov (United States)

    Spruell, Geraldine

    1986-01-01

    With more mothers than ever in the labor force, companies are realizing they must help workers deal with multiple roles. Employer-sponsored programs include day care centers, vouchers, and referrals; flextime; job sharing; extended leave, flexible benefits, and work-at-home plans; and support groups. (CH)

  12. Aerocapacitor commercialization plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  13. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... activities In your community Funding opportunities Internships and jobs View all pages in this section Back to section menu It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Breastfeeding myths in ...

  14. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media inquiries Social media About Us Who we are What we do Work with us Our vision and mission Programs and ...

  15. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... your life Partner resources Subscribe To receive Breastfeeding email updates Enter email Submit Planning ahead From choosing the crib to ... Breastfeeding: The #First31 Days Subscribe To receive Breastfeeding email updates Enter email Submit All material contained on ...

  16. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... we are What we do Programs and activities Work with us Contact Us Blog Popular topics Vision and mission Leadership Programs and activities In your community Funding opportunities Internships and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural ...

  17. Recycling Lesson Plan

    Science.gov (United States)

    Okaz, Abeer Ali

    2013-01-01

    This lesson plan designed for grade 2 students has the goal of teaching students about the environmental practice of recycling. Children will learn language words related to recycling such as: "we can recycle"/"we can't recycle" and how to avoid littering with such words as: "recycle paper" and/or "don't throw…

  18. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Hunter, S.W.; Gallegos, G.M.; Surano, K.A.; Lamson, K.C.; Tate, P.J.; Balke, B.K.; Biermann, A.H.; Hoppes, W.G.; Fields, B.C.; Gouveia, F.J.; Berger, R.L.; Miller, F.S.; Rueppel, D.W.; Sims, J.M.

    1992-04-01

    The primary tasks of the environmental monitoring section (EMS) Livermore National Laboratory (LLNL) are: effluent monitoring of air, sewer, and NPDES water. Surveillance monitoring of soil, vegetation and foodstuff, water, air particulate, and air tritium. Radiation monitoring, dose assessment, emergency response, quality assurance, and reporting. This report describes LLNL and the monitoring plan

  19. Complex systems, evolutionary planning?

    NARCIS (Netherlands)

    Bertolini, L.; de Roo, G.; Silva, E.A.

    2010-01-01

    Coping with uncertainty is a defining challenge for spatial planners. Accordingly, most spatial planning theories and methods are aimed at reducing uncertainty. However, the question is what should be done when this seems impossible? This chapter proposes an evolutionary interpretation of spatial

  20. What is Planning?

    OpenAIRE

    Lennon, Mick

    2017-01-01

    Planners are frequently asked to explain what planning is. This seemingly simple request is often met with a vague response that leaves the interlocutors unsatisfied. A viewpoint is presented on how to identify and convey what it actually is we do as planners.

  1. PLANNING YOUR REMOVALS

    CERN Multimedia

    Service déménagement; ST Division

    1999-01-01

    To give you better service and avoid lengthy delays, the Removals Service advises you to refrain from programming moves between 26 July and 3 September, as large-scale removals are already planned during this summer period.Thanking you in advance for your co-operation and understanding.Removals Service STTel. 74185 / Mobile 164017

  2. Smart Consumer Lesson Plans.

    Science.gov (United States)

    New Jersey Consortium for Consumer Education, Newark.

    Lesson plans are provided for use with different populations of pre-K through senior high school students in four different areas of consumer education. Eight units in advertising are included: A First Look at Ads (pre-K-Grade 3), Don't Judge a Book by Its Cover (Grades 1-3), Fatal Distraction (Junior High), Package Labeling (Junior High), Product…

  3. IAEA Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geist, William H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-15

    The objectives for this presentation are to describe the method that the IAEA uses to determine a sampling plan for nuclear material measurements; describe the terms detection probability and significant quantity; list the three nuclear materials measurement types; describe the sampling method applied to an item facility; and describe multiple method sampling.

  4. A Comprehensive Planning Model

    Science.gov (United States)

    Temkin, Sanford

    1972-01-01

    Combines elements of the problem solving approach inherent in methods of applied economics and operations research and the structural-functional analysis common in social science modeling to develop an approach for economic planning and resource allocation for schools and other public sector organizations. (Author)

  5. Uranium enrichment plans

    International Nuclear Information System (INIS)

    Thomas, D.C.; Gagne, R.W.

    1978-01-01

    The following topics are covered: the status of the Government's existing uranium enrichment services contracts, natural uranium requirements based on the latest contract information, uncertainty in predicting natural uranium requirements based on uranium enrichment contracts, and domestic and foreign demand assumed in enrichment planning

  6. Planning with Reachable Distances

    KAUST Repository

    Tang, Xinyu

    2009-01-01

    Motion planning for spatially constrained robots is difficult due to additional constraints placed on the robot, such as closure constraints for closed chains or requirements on end effector placement for articulated linkages. It is usually computationally too expensive to apply sampling-based planners to these problems since it is difficult to generate valid configurations. We overcome this challenge by redefining the robot\\'s degrees of freedom and constraints into a new set of parameters, called reachable distance space (RD-space), in which all configurations lie in the set of constraint-satisfying subspaces. This enables us to directly sample the constrained subspaces with complexity linear in the robot\\'s number of degrees of freedom. In addition to supporting efficient sampling, we show that the RD-space formulation naturally supports planning, and in particular, we design a local planner suitable for use by sampling-based planners. We demonstrate the effectiveness and efficiency of our approach for several systems including closed chain planning with multiple loops, restricted end effector sampling, and on-line planning for drawing/sculpting. We can sample single-loop closed chain systems with 1000 links in time comparable to open chain sampling, and we can generate samples for 1000-link multi-loop systems of varying topology in less than a second. © 2009 Springer-Verlag.

  7. Medicare Advantage Plans

    Science.gov (United States)

    ... Glossary MyMedicare.gov Login Search Main Menu , collapsed Main Menu Sign Up / Change Plans Getting started with ... setup: setupNotifier, notify: notify }; lrNotifier.setup(); $("#menu-btn, li.toolbarmenu .toolbarmenu-a").click(function() { // var isExpanded = ' is ...

  8. Drug Plan Coverage Rules

    Science.gov (United States)

    ... Glossary MyMedicare.gov Login Search Main Menu , collapsed Main Menu Sign Up / Change Plans Getting started with ... setup: setupNotifier, notify: notify }; lrNotifier.setup(); $("#menu-btn, li.toolbarmenu .toolbarmenu-a").click(function() { // var isExpanded = ' is ...

  9. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  10. ECP divisional training: plan 1996

    OpenAIRE

    Storr, Kenneth Mick

    1996-01-01

    The divisional training plan is produced each year at the request of the Joint Training Board (JTB) following a recommendation in the 1991 CERN Training Plan which states that divisions should produce a plan setting out training priorities. This plan presents a review of training activities. a report on ECP progress in implementing the recommendations of the 1995 CERN training plan, a discussion of divisional training objectives, and a summary of training requests generated by the 1996 period...

  11. Human-scientific Planning Theory

    OpenAIRE

    Hagen, Aksel

    1998-01-01

    This working report is a paper written to XII AESOP Congress 22 – 25 July 1998, Aveiro, Portugal. It is a presentation of human-scientific action theory and its linkage to planning, both planning theory and planning practice. Human-scientific action theory is created by professor Gunnar Olsson and professor José Luis Ramírez, Nordic School of Planning, Stockholm. Planning is primarily a practical and reflective activity. The notion ”Planning” may, therefore, describe the activi...

  12. Nucleus-nucleus collisions and the nuclear equation of state

    International Nuclear Information System (INIS)

    Keane, D.

    1990-01-01

    Activities during the past year have been centered around: the analysis of existing experimental data from the Bevalac streamer chamber and from the Kent state neutron flow experiment 848H; transport model comparisons with these data and with published results from other experiments; and development of future Bevalac experiments, with particular emphasis on the EOS TPC. Activities under and above have led to 10 papers either published or submitted for publication in journals or conference proceedings during the 12-month period ending in March 1990. The PI is spokesperson for one of three beam-time proposals for the first round of experiments at the EOS TPC, to be considered by the Bevalac PAC in June 1990. Planned activities for the coming budget period include a continuation of strong emphasis on the TPC, and the initiation of participation in a planned RHIC experiment

  13. Automatic planning of head and neck treatment plans

    DEFF Research Database (Denmark)

    Hazell, Irene; Bzdusek, Karl; Kumar, Prashant

    2016-01-01

    radiation dose planning (dosimetrist) and potentially improve the overall plan quality. This study evaluates the performance of the Auto-Planning module that has recently become clinically available in the Pinnacle3 radiation therapy treatment planning system. Twenty-six clinically delivered head and neck...... as the previously delivered clinical plans. For all patients, the Auto-Planning tool produced clinically acceptable head and neck treatment plans without any manual intervention, except for the initial target and OAR delineations. The main benefit of the method is the likely improvement in the overall treatment......Treatment planning is time-consuming and the outcome depends on the person performing the optimization. A system that automates treatment planning could potentially reduce the manual time required for optimization and could also pro-vide a method to reduce the variation between persons performing...

  14. Performance Confirmation Plan

    International Nuclear Information System (INIS)

    Lindner, E.N.

    2000-01-01

    As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that is affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program

  15. Performance Confirmation Plan

    International Nuclear Information System (INIS)

    Lindner, E.N.

    2000-01-01

    As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program

  16. The Austrian Space Plan

    Science.gov (United States)

    Pseiner, K.; Balogh, W.

    2002-01-01

    After several years of preparation and discussion among the involved players, the Austrian Space Plan was approved for implementation in November 2001. Based on careful benchmarking and analysis of the capabilities of the Austrian space sector it aims to create excellent conditions for the sector's further development. The new space strategy embraces Austria's participation in the mandatory and optional programmes of the European Space Agency and establishes a National Space Programme supported by separate funding opportunities. A set of clearly-defined indicators ensures that the progress in implementing the Space Plan can be objectively judged through independent, annual reviews. The National Space Programme promotes international cooperation in space research and space activities with the aim to strengthen the role of space science and to better prepare Austrian space industry for the commercial space market. In the framework of the Space Plan the Austrian Space Agency has been tasked with integrating the industry's growing involvement in aeronautics activities to better utilize synergies with the space sector. This paper reviews the various steps leading to the approval of the new space strategy and discusses the hurdles mastered in this process. It reports on the Space Plan's first results, specifically taking into account projects involving international cooperation. For the first the Austria aerospace-sector can rely on an integrated strategy for aeronautics- and space activities which is firmly rooted in the efforts to enhance the country's R&D activities. It may also act as a useful example for other small space- using countries planning to enhance their involvement in space activities.

  17. 76 FR 45606 - Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan...

    Science.gov (United States)

    2011-07-29

    ...-N131; 80221-1112-80221-F2] Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan Amendment, Southern California: Environmental Impact Statement AGENCY: Fish and..., as amended, for the proposed Desert Renewable Energy Conservation Plan (DRECP). The EIS will be a...

  18. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  19. The Mission Operations Planning Assistant

    Science.gov (United States)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  20. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  1. RHIC STATUS AND PLANS.

    Energy Technology Data Exchange (ETDEWEB)

    PILAT,R.

    2002-06-02

    RHIC ended successfully its second year of operation in January 2002 after a six month run with gold ions and two months of polarized proton collisions. I will review the machine performance and accomplishments, that include reaching design energy (100 GeV/u) and design luminosity during the gold run, and the first high energy (100 GeV) polarized proton collisions. I will also discuss the machine development strategy and the main performance milestones. The goals and plans for the shutdown and the nest run, scheduled to start in November 2002 have been the focus of a RHIC Retreat in March 2002. I will summarize findings and plans for the upcoming run and outline a vision for the nest few years of RHIC operation and upgrades.

  2. Planned place of birth

    DEFF Research Database (Denmark)

    Overgaard, Charlotte; Coxon, Kirstie; Stewart, Mary

    Title Planned place of birth: issues of choice, access and equity. Outline In Northern European countries, giving birth is generally safe for healthy women with uncomplicated pregnancies, and their babies. However, place of birth can affect women’s outcomes and experiences of birth. Whilst tertiary...... countries, maternity care is provided free to women, through public financing of health care; universal access to care is therefore secured. Nevertheless, different models of care exist, and debates about the appropriateness of providing maternity care in different settings take place in both countries...... in Denmark Coxon K et al: Planned place of birth in England: perceptions of accessing obstetric units, midwife led units and home birth amongst women and their partners. How these papers interrelate These papers draw upon recent research in maternity care, undertaken in Denmark and in England. In both...

  3. Future planning - utopia

    International Nuclear Information System (INIS)

    Boernke, F.

    1978-01-01

    Our life develops as the anticipation of future. Everything we wish, hope, plan and carry out and think is or should be related to future and will have its effects in future. The certainty may spread that it is a necessary obligation to learn to find out our actual being more clearly to be able to develop a thinking and acting that is directed to future that has also a total of responsability as its essence. We will later atone for the failed outlooks into future or for only moderate or uncompleted starts of planning. For this reason we should consider that future does not come for its own, not without our demands, not without our acting. Only if our reflection and aspiration, thinking and acting is done with moderate and circumspect sense in the right way it will be a good fundamental for the future. (orig.) [de

  4. Particle therapy planning

    International Nuclear Information System (INIS)

    Zink, S.

    1987-01-01

    The Radiation Research Program (RRP) supports a variety of research through grants and contracts. During the last few years, considerable effort has been devoted to treatment planning evaluation in particle, photon and electron radiotherapy. In 1981, RRP issued a request for proposals (RFP) for the evaluation of treatment planning with particle beam radiotherapy - to include protons, heavy ions and neutrons. Contracts were subsequently awarded to four institutions: Massachusetts General Hospital (MGH), University of Texas and M.D. Anderson Hospital (MDAH), the heavy ion project at Lawrence Berkeley Laboratory (LBL) and University of Pennsylvania (UPa). These contracts reached completion December 31, 1986. The work for the contracts was carried out at the individual institutions and guided through a Working Group made up of the Project Officer and Principal Investigators and primary physicians and physicists at each of the participating institutions. This report summarizes the findings of the Working Group and makes recommendations for further research

  5. Guam Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  6. Public Participation Plan

    International Nuclear Information System (INIS)

    1984-06-01

    The purpose of this Public Participation Plan is to describe the Department of Energy's plan for involving the public in the decision-making process required by the National Environmental Policy Act (NEPA) of 1969 as related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by congress in the Uranium Mill Tailings Radiation Control Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated inactive uranium mill tailings sites and associated vicinity properties, which are located in ten western states and in Pennsylvania. The Act was amended in 1982 to also include vicinity properties contaminated with residual radioactive material in Edgemont, South Dakota

  7. Oil spill response plan

    International Nuclear Information System (INIS)

    1999-08-01

    The plan outlined in this document specifies the actions that the Canadian Wildlife Service Atlantic Region is mandated to take in the event of an oil spill, or on discovering oiled migratory birds in terrestrial, fresh water, marine and inter-tidal habitats. In addition to describing the role and responsibilities of the Canadian Wildlife Service, the document also describes response plans of other agencies for dealing with all wildlife species affected by oil spills. Reporting paths, the lead agency concept, shared responsibilities with other Canadian Wildlife Service regional offices, provincial agencies, Heritage Canada, non-government wildlife response agencies, oil spill response organizations, and international organizations are outlined. An overview of the reporting and communications process is also provided

  8. Plan og virkelighed

    DEFF Research Database (Denmark)

    Kaufmann, E.

    Der er dén bagside ved altid at se fremad og lægge planer, at man ikke rigtigt får tid til at se bagud og lære af sine fejl. I denne bog er det imidlertid forsøgt at se tilbage på to mindre planer, som blev lagt for 20 år siden. Hvordan svarer virkelighed til plan?......Der er dén bagside ved altid at se fremad og lægge planer, at man ikke rigtigt får tid til at se bagud og lære af sine fejl. I denne bog er det imidlertid forsøgt at se tilbage på to mindre planer, som blev lagt for 20 år siden. Hvordan svarer virkelighed til plan?...

  9. CIPS Validation Data Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nam Dinh

    2012-03-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  10. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  11. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  12. Campus Capability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Arsenlis, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bailey, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bergman, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brase, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brenner, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Camara, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Carlton, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Cheng, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chrzanowski, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Colson, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); East, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Farrell, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ferranti, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gursahani, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hansen, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Helms, L. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hernandez, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jeffries, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Larson, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lu, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNabb, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mercer, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Skeate, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sueksdorf, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zucca, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Le, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ancria, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Scott, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Leininger, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gagliardi, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gash, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bronson, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chung, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hobson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Meeker, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sanchez, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zagar, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Quivey, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sommer, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Atherton, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-06

    Lawrence Livermore National Laboratory Campus Capability Plan for 2018-2028. Lawrence Livermore National Laboratory (LLNL) is one of three national laboratories that are part of the National Nuclear Security Administration. LLNL provides critical expertise to strengthen U.S. security through development and application of world-class science and technology that: Ensures the safety, reliability, and performance of the U.S. nuclear weapons stockpile; Promotes international nuclear safety and nonproliferation; Reduces global danger from weapons of mass destruction; Supports U.S. leadership in science and technology. Essential to the execution and continued advancement of these mission areas are responsive infrastructure capabilities. This report showcases each LLNL capability area and describes the mission, science, and technology efforts enabled by LLNL infrastructure, as well as future infrastructure plans.

  13. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  14. Hanford Emergency Response Plan

    International Nuclear Information System (INIS)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures

  15. The planning cycle.

    Science.gov (United States)

    Johnson, William

    2005-01-01

    Information technology planning can be described as a continuous cyclical process composed of three phases whose primary purpose is optimum allocation of scarce resources. In the assessment phase, planners assess user needs, environmental factors, business objectives, and IT infrastructure needs to develop IT projects that address needs in each of these areas. A major goal of this phase is to develop a broad IT inventory. The prioritization phase seeks to ensure optimum allocation of scarce resources by prioritizing ITprojects based on: Costs--total life cycle costs. Benefits--both quantitative and non-quantitative, including support for the organization's strategic business objectives. Risks--subjective assessments of technological and non-technological risks. Implementation requirements--time and personnel requirements to implement the system. The scheduling phase incorporates sequencing considerations, personnel availability, and budgetary constraints to produce an IT plan in which project priorities are adjusted to meet organizational realities.

  16. Beyond the business plan.

    Science.gov (United States)

    Harrison, J; Thompson, D; Flanagan, H; Tonks, P

    1994-01-01

    Acknowledges that business planning in the NHS frequently disappoints. Reasons for this are found in the tendency for managers to view the production of a plan as an end rather than a means. A further difficulty resides in the perception managers have of their world. Argues that marketing is the most appropriate paradigm for understanding and structuring this world at present. However, an adaptive cognitive style is necessary to allow constant reframing within the dominant paradigm or even reframing of the paradigm itself. In adopting these approaches, the probability of achieving competitive advantage is heightened. If they are ignored, however, it is likely that training and development techniques, however sophisticated, will have little lasting impact.

  17. CIPS Validation Data Plan

    International Nuclear Information System (INIS)

    Dinh, Nam

    2012-01-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  18. Multistate Health Plans

    Directory of Open Access Journals (Sweden)

    Robert E. Moffit PhD

    2015-09-01

    Full Text Available We discuss and evaluate the Multi-State Plan (MSP Program, a provision of the Affordable Care Act that has not been the subject of much debate as yet. The MSP Program provides the Office of Personnel Management with new authority to negotiate and implement multistate insurance plans on all health insurance exchanges within the United States. We raise the concern that the MSP Program may lead to further consolidation of the health insurance industry despite the program’s stated goal of increasing competition by means of health insurance exchanges. The MSP Program arguably gives a competitive advantage to large insurers, which already dominate health insurance markets. We also contend that the MSP Program’s failure to produce increased competition may motivate a new effort for a public health insurance option.

  19. Hanford Emergency Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures.

  20. SE debt restructuring plan

    International Nuclear Information System (INIS)

    Janoska, J.

    2003-01-01

    Slovenske elektrarne, a.s. (SE) plans to restructure one's own debts in 2003-2005. Debt restructuring plan is following: 2003: Collection of pre-payment on electricity - 60 million Euro (2.5 billion Slovak crowns), consumer unknown. Own promissory notes in total value of 100 million US$ (3.5 billion Slovak crowns) - in process. Sale of claims worth 2.4 billion Slovak crowns (57.21 million Euro) - negotiations in process. 2003/2004: Restructuring of loans payable IV. quarter 2003 and at the beginning of 2004 in value of 200 million Euro (8.3 billion Slovak crowns). Aim of SE is a new credit payable within 7 years, with instalments payable in the last two to three without any state subsidies. 2005: Loans worth 460 million Euro (189 billion Slovak crowns) will still remain. SE want to negotiate them with banks without state support

  1. Architecture for spacecraft operations planning

    Science.gov (United States)

    Davis, William S.

    1991-01-01

    A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.

  2. Plan's CCCD approach - Country study PLAN-Bangladesh

    NARCIS (Netherlands)

    Uffelen, van G.J.

    2009-01-01

    PLAN Netherlands National Organisation has in coordination with PLAN International Headquarters commissioned an independent formative evaluation study to get systematic insight in the preconditions for appropriate functionality of Child Centred Community Development (CCCD) and to strengthen common

  3. The Importance of a Business Plan when Planning a ...

    African Journals Online (AJOL)

    The Importance of a Business Plan when Planning a Lexicographical Project* ... It is, however, an important step towards the establishment of a dictionary project. The compilation of a dictionary ... AJOL African Journals Online. HOW TO USE ...

  4. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  5. Defense waste management plan

    International Nuclear Information System (INIS)

    1983-06-01

    Defense high-level waste (HLW) and defense transuranic (TRU) waste are in interim storage at three sites, namely: at the Savannah River Plant, in South Carolina; at the Hanford Reservation, in Washington; and at the Idaho National Engineering Laboratory, in Idaho. Defense TRU waste is also in interim storage at the Oak Ridge National Laboratory, in Tennessee; at the Los Alamos National Laboratory, in New Mexico; and at the Nevada Test Site, in Nevada. (Figure E-2). This document describes a workable approach for the permanent disposal of high-level and transuranic waste from atomic energy defense activities. The plan does not address the disposal of suspect waste which has been conservatively considered to be high-level or transuranic waste but which can be shown to be low-level waste. This material will be processed and disposed of in accordance with low-level waste practices. The primary goal of this program is to utilize or dispose of high-level and transuranic waste routinely, safely, and effectively. This goal will include the disposal of the backlog of stored defense waste. A Reference Plan for each of the sites describes the sequence of steps leading to permanent disposal. No technological breakthroughs are required to implement the reference plan. Not all final decisions concerning the activities described in this document have been made. These decisions will depend on: completion of the National Environmental Policy Act process, authorization and appropriation of funds, agreements with states as appropriate, and in some cases, the results of pilot plant experiments and operational experience. The major elements of the reference plan for permanent disposal of defense high-level and transuranic waste are summarized

  6. The Student Plan

    DEFF Research Database (Denmark)

    Krejsler, John B.

    2009-01-01

    that must reconcile the challenges of student diversity, differentiated teaching, the documentation of achievement and so forth. Social technologies reduce complexity by coding procedures, thus signalling what is expected in terms of learning activities, and by coding subject positions, thereby guiding...... teachers and students in terms of the roles they may position themselves in. Some of the most prevalent social technologies adopted by schools today include project work, logbooks, social contracts, interactive testing, and student and personal action plans....

  7. Sustainability and Business Planning

    OpenAIRE

    Joy Davidson

    2017-01-01

    This session will consider the longer term sustainability of ROM services and provide an introduction to Business Model Canvas (BMC) as a tool to help develop a longer term business plan. Working in institutional groups, each group will work together to develop a BMC for their institution. This will be revisited at several stages over the life of the project and updated accordingly. By the end of this session, participants will: •be able to flesh out a Business Model C...

  8. Treatment planning systems

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    All aspects of treatment planning in radiotherapy are discussed in detail. Included are, among others, machine data and their acquisition, photon dose calculations and tests thereof, criteria of acceptability, sources of uncertainties, from 2D to 3D and from 3D to IMRT, dosimetric measurements for RTP validation, frequency of QA tests and suggested tolerances for TPS, time and staff requirements, model based segmentation, multi-dimensional radiotherapy (MD C RT), and biological IMRT process. (P.A.)

  9. Planning and participation

    International Nuclear Information System (INIS)

    Rucht, D.

    1982-01-01

    This study is trying to give a vast survey of the political and administrative system. It is to demonstrate the relations between its secular development trends, the necessity and the limits of political planning under the present conditions and, finally, the increasing demands for participation as expressed especially by citizens' initiatives. These stages, however, are certainly not presented in a smooth manner. Yet the author claims to have kept a certain continuity and inner logic of presentation and argumentation. (orig./DG) [de

  10. Operation Chromite: Amphibious Planning

    OpenAIRE

    2005-01-01

    tut present Tutorial Presentation Interactive Media Element This interactive tutorial covers the Inchon landing case study that provides several good examples of the types of decisions made during the amphibious planning process, and how they compare to the current matrix of the ten primary decisions for amphibious operation required today by joint doctrine. Operation Chromite is used as an example. 8808A Warfighting from the Sea: Amphibious Operations

  11. The Airlift Planning Problem

    Science.gov (United States)

    2017-01-02

    heuristic , which is a local search heuristic . We start with a partition S1, . . . , SA of the requirements, where Sa represents the requirements...in what order the aircraft will pickup and deliver its assigned requirements), using a combination of heuristics and column generation. Through...priority and short-notice missions. The planning of airlift missions is of critical importance to USTRANSCOM, for two reasons. First, due to the time

  12. 1998 Army Modernization Plan

    Science.gov (United States)

    1998-01-01

    Biological (CB) Protective Duty Uniform (STO) • Biometrics (SRO) • Nanoscience (SRO) • Millimeter Wave Material and Dissemination Technology... Biometrics and Nanoscience SROs will enable the development of advanced NBC detection and characterization systems, including the exploitation of biologically...Requirements Trailers • Procure HEMAT Trailers Figure K-23 K-19 //;<?. U.S. Army 1997Modernization Plan This final fleet assessment, made against the

  13. Planning the Nabarlek decommissioning

    International Nuclear Information System (INIS)

    Bailey, P.

    1986-01-01

    In planning the closure of a mine, there are two important considerations that have to be borne in mind. These are the ultimate use of the land; and the political framework within which the work is to be done. With regard to the Nabarlek mine, the end use is covered by an agreement between the operating company, Queensland Mines Limited, and the agents of the Aboriginal landowners, the Northern Land Council

  14. Statistical sampling plans

    International Nuclear Information System (INIS)

    Jaech, J.L.

    1984-01-01

    In auditing and in inspection, one selects a number of items by some set of procedures and performs measurements which are compared with the operator's values. This session considers the problem of how to select the samples to be measured, and what kinds of measurements to make. In the inspection situation, the ultimate aim is to independently verify the operator's material balance. The effectiveness of the sample plan in achieving this objective is briefly considered. The discussion focuses on the model plant

  15. Multiobjective programming and planning

    CERN Document Server

    Cohon, Jared L

    2004-01-01

    This text takes a broad view of multiobjective programming, emphasizing the methods most useful for continuous problems. It reviews multiobjective programming methods in the context of public decision-making problems, developing each problem within a context that addresses practical aspects of planning issues. Topics include a review of linear programming, the formulation of the general multiobjective programming problem, classification of multiobjective programming methods, techniques for generating noninferior solutions, multiple-decision-making methods, multiobjective analysis of water reso

  16. SERC corporate plan 1993

    International Nuclear Information System (INIS)

    1993-03-01

    In its last Corporate Plan, the Science and Engineering Research Council (SERC) planned wide-ranging policy and programme reviews. These have been carried out and the results set the context for this plan. In addition, the SERC is responding to major changes in the higher education sector and a difficult financial climate. The Plan has been prepared before the Government's proposed White Paper on science and technology is available but is consistent with the SERC's advice on the White Paper. The SERC's ''mission statement'' recognises its dual role of strengthening the United Kingdom's capabilities in fundamental research and of developing capabilities in strategic research related to industrial and social need. Six strategic aims are identified: the funding of a portfolio of excellent research which contributes both to advancement of knowledge, and economic and social advance, the support of the training of scientists and engineers, the improvement of knowledge transfer within the ''science and engineering base'' and between this base and industry, the promotion of effective international collaboration, increasing the public awareness of research in science and engineering and improving the economy, efficiency and effectiveness of all of the SERC's operations. Within its programme expenditure, the SERC will examine whether funding should be extended to a wider range of bodies; develop new, more efficient, ways of funding higher education institutes (HEI) research; increase emphasis on output measures of research; specify service standards; and market-test scientific support activities. The SERC will make gains of at least 1.5% a year in efficiency of administration, through measures including market testing, and will extend management accounting systems. (Author)

  17. HEDR model validation plan

    International Nuclear Information System (INIS)

    Napier, B.A.; Gilbert, R.O.; Simpson, J.C.; Ramsdell, J.V. Jr.; Thiede, M.E.; Walters, W.H.

    1993-06-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project has developed a set of computational ''tools'' for estimating the possible radiation dose that individuals may have received from past Hanford Site operations. This document describes the planned activities to ''validate'' these tools. In the sense of the HEDR Project, ''validation'' is a process carried out by comparing computational model predictions with field observations and experimental measurements that are independent of those used to develop the model

  18. Planning for nuclear emergencies

    International Nuclear Information System (INIS)

    Lakey, J.R.A.

    1989-01-01

    This paper aims to stimulate discussions between nuclear engineers and the radiological protection professions in order to facilitate planning for nuclear emergencies. A brief review is given of the response to nuclear accidents. Studying accidents can lead to prevention, but some effort must be put into emergency response. Such issues as decontamination and decommissioning, socio-economic consequences, education and training for nuclear personnel and exercises and drills, are raised. (UK)

  19. Energy planning in India

    International Nuclear Information System (INIS)

    Venu, S.

    1982-01-01

    A review is presented of India's planning for energy requirements in coal, oil, gas and nuclear power and in the fields of solar energy and the extension of forest areas to provide firewood. Coal and natural gas supplies will be increased to reduce oil demand. There will be an accelerated programme of development of bio-gas, an exploration of solar energy potential and extensive afforestation to provide additional energy sources. (author)

  20. Qualifying for Career Planning

    Directory of Open Access Journals (Sweden)

    Aleksandra Kovač

    1996-12-01

    Full Text Available The need for education in various spheres of life, which allows a person to fully develop his/her personality, is more and more presen t also in our society. The discussed educational programme Discovering Vocational Goals and Forming Strategies· to Realize them qualifies people for autonomous career planning by offer­ ing them one of the possible ways of making decisions in relation to profession and job. In the course of the realization of the programme the participants are given the chance to think about the kind of work that would suit their interests, capabilities and individual characteristics as weel as the needs in certain environments (possible employers. They are encouraged to make an actual plan, stating how and when the desired objective will be reached. In 1995 the pro­ gramme was being carried out within nine semi­ nars organized at the Employment Offices in Maribor and Ptuj. During that time the pro­ gramme has also been evaluated by Doba - Education Office, which was funded by the Ministry of Work, Family and Social Matters. The paper includes the content of the programme as well as the assessments of the research project. The presented data show that the participants learned the method of career planning and acqu­ired greater self-confidence and motivation to solve their job problem actively.

  1. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  2. Future land use plan

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ''Future Land Use'' initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities' interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory's view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts

  3. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  4. Landscape Planning of Schoolyards

    Science.gov (United States)

    Kopeva, A.; Khrapko, O.; Ivanova, O.

    2017-11-01

    The optimal landscape architecture planning of schoolyards allows for creation of favorable conditions for children personal development and physical fitness. The key principles of schoolyard landscape planning, same as for other areas intended for children, are as follows: establishment of a favorable microclimate, safety, aesthetic and educational environment. Green spaces play an essential role in this respect as they are essential to sanitary, hygienic, structural, and spatial planning performing decorative, artistic, cognitive, and educational functions in these areas. Various types of landscape plantings are used in school areas: borders, lawns, beds, vines, ornamental arrangements, and various potted plants. Children’s safety is the key principle when selecting a landscape design type and the plants’ range. Any allergenic, poisonous, thorny, strong-smelling or life-threatening plants are excluded. Plants on school grounds can serve as visual aids for studies. Drought-resistant, attractive, colorful, abundantly blooming plants with variable leaf texture are preferred. Ornamental trees and shrubs as well as perennials and annuals provide a broad plant range for school grounds.

  5. Site characterization plan:

    International Nuclear Information System (INIS)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs

  6. Ice condenser experimental plan

    International Nuclear Information System (INIS)

    Kannberg, L.D.; Piepel, G.F.; Owczarski, P.C.; Liebetrau, A.M.

    1986-01-01

    An experimental plan is being developed to validate the computer code ICEDF. The code was developed to estimate the extent of aerosol retention in the ice compartments of pressurized water reactor ice condenser containment systems during severe accidents. The development of the experimental plan began with review of available information on the conditions under which the code will be applied. Computer-generated estimates of thermohydraulic and aerosol conditions entering the ice condenser were evaluated and along with other information, used to generate design criteria. The design criteria have been used for preliminary test assembly design and for generation of statistical test designs. Consideration of the phenomena to be evaluated in the testing program, as well as equipment and measurement limitations, have led to changes in the design criteria and to subsequent changes in the test assembly design and statistical test design. The overall strategy in developing the experimental plan includes iterative generation and evaluation of candidate test designs using computer codes for statistical test design and ICEDF for estimation of experimental results. Estimates of experimental variability made prior to actual testing will be verified by replicate testing at preselected design points

  7. Mobile systems capability plan

    International Nuclear Information System (INIS)

    1996-09-01

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered

  8. Future land use plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  9. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  10. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  11. Emergency planning zone reduction

    International Nuclear Information System (INIS)

    Edwards, C.

    2002-01-01

    This paper describes the process used by a large industrial Department of Energy (DOE) site to communicate changing hazards to its stakeholders and install the confidence necessary to implement the resulting emergency planning changes. Over the last decade as the sites missions have shifted from full-scale production to a greater emphasis on environmental restoration and waste management, the off-site threat from its operations has substantially decreased. The challenge was to clearly communicate the reduced hazards, install confidence in the technical analysis that documented the hazard reduction, and obtain stakeholder buy-in on the path forward to change the emergency management program. The most significant change to the emergency management program was the proposed reduction of the sites Emergency Planning Zone (EPZ). As the EPZ is defined as an area for which planning is needed to protect the public in the event of an accident, the process became politically challenging. An overview of how the site initially approached this problem and then learned to more substantially involve the state and local emergency preparedness agencies and the local Citizens Advisory Board will be presented. (author)

  12. Outage planning in Japan

    International Nuclear Information System (INIS)

    Nedderman, John.

    1997-01-01

    Nuclear plant operators in Japan are constrained to keep refuelling and maintenance outages to a minimum by the regulation limiting operating cycles to no longer than 13 months. Outage planning by two contrasting operators is described. Hokkaido Electric, which operates only one plant, Tomari, with two PWRs, plans to reduce outage time from the present 65 days in two stages. Detailed review of previous outage schedules has shown that a reduction to 59 days should be achievable by careful planning without any fundamental changes. The second reduction to 49 days will require such measures as relaxing water purity standards, rescheduling fuel unloading and loading shifts and speeding up eddy current testing of primary equipment by using steam generator nozzle dams. Kansai Electric, operating 11 PWRs at three plants, has scope for reducing outages at all of its units using a range of measures. Steam generator replacement in the seven oldest reactors, completed in July 1997, is by far the most significant of these and is expected to save 64 days repair time in a previous average outage time of 131 days. (UK)

  13. Ontario's energy action plan

    International Nuclear Information System (INIS)

    2003-07-01

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  14. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  15. To Plan or Not to Plan, That Is the Question

    Science.gov (United States)

    Dolph, David A.

    2016-01-01

    Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…

  16. Self-interested Planning Agents using Plan Repair

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    We present a novel approach to multiagent planning for selfinterested agents. The main idea behind our approach is that multiagent planning systems should be built upon (singleagent) plan repair systems. In our system agents can exchange goals and subgoals through an auction, using their own

  17. Self-interested planning agents using plan repair

    NARCIS (Netherlands)

    R.P.J. van der Krogt; M.M. de Weerdt (Mathijs)

    2005-01-01

    htmlabstractWe present a novel approach to multiagent planning for selfinterested agents. The main idea behind our approach is that multiagent planning systems should be built upon (singleagent) plan repair systems. In our system agents can exchange goals and subgoals through an auction, using

  18. ERISA and health plans.

    Science.gov (United States)

    Schmidt, P; Mazo, J; Ladenheim, K

    1995-11-01

    This Issue Brief is designed to provide a basic understanding of the relationship of the Employee Retirement Income Security Act of 1974 (ERISA) to health plans. It is based, in part, on an Employee Benefit Research Institute-Education and Research Fund (EBRI-ERF) educational briefing held in March 1995. This report includes a section by Peter Schmidt of Arnold & Porter, a section about multiemployer plans written by Judy Mazo of The Segal Company; and a section about ERISA and state health reform written by Kala Ladenheim of the Intergovernmental Health Policy Project. Starting in the late 1980s, three trends converged to make ERISA a critical factor in state health reforms: increasingly comprehensive state health policy experimentation; changes in the makeup of the insurance market (including the rise in self-insurance and the growth of managed care); and increasingly expansive interpretations of ERISA by federal courts. The changing interpretations of ERISA's relationship to three categories of state health initiatives--insurance mandates, medical high risk pools, and uncompensated care pools--illustrate how these forces are playing out today. ERISA does have a very broad preemptive effect. Federal statutes do not need to say anything about preemption in order to preempt state law. For example, if there is a direct conflict, it would be quite clear under the Supremacy Clause [of the U.S. Constitution] that ERISA, or any federal statue, would preempt a directly conflicting state statute. States can indirectly regulate health care plans that provide benefits through insurance contracts by establishing the terms of the contract. And they also raise money by imposing premium taxes. But they cannot do the same with respect to self-funded plans. That is one of the factors that has caused a great rise in the number of self-funded plans. State regulation [of employee benefits] can create three kinds of problems: cost of taxes, fees, or other charges; cost of dealing

  19. Unvented Drum Handling Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    2000-01-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  20. Digital Architecture Planning Model

    International Nuclear Information System (INIS)

    Oxstrand, Johanna Helene; Al Rashdan, Ahmad Yahya Mohammad; Bly, Aaron Douglas; Rice, Brandon Charles; Fitzgerald, Kirk; Wilson, Keith Leon

    2016-01-01

    As part of the U.S. Department of Energy's Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development

  1. Digital Architecture Planning Model

    Energy Technology Data Exchange (ETDEWEB)

    Oxstrand, Johanna Helene [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Al Rashdan, Ahmad Yahya Mohammad [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Bly, Aaron Douglas [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Rice, Brandon Charles [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Fitzgerald, Kirk [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS); Wilson, Keith Leon [Idaho National Lab. (INL), Idaho Falls, ID (United States). Light Water Reactor Sustainability Program (LWRS)

    2016-03-01

    As part of the U.S. Department of Energy’s Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development, including

  2. Planning issues for IMRT

    International Nuclear Information System (INIS)

    Hoban, P.; Schneider, M.; Smee, R.

    2001-01-01

    Full text: Despite the 'inverse planning' stage of an intensity modulated radiotherapy (IMRT) treatment there remains a large number of variables that can, and must, be set manually. These variables can significantly affect the quality of the dose distribution arrived at by the optimisation. Clinical IMRT planning with the Radionics XPlan system for micro-multileaf collimator (MMLC) delivery has allowed for important lessons to be learned regarding the best beam and organ configurations prior to optimisation of beamlet weights. Important user-definable variables are beam directions, organ parameters (dose goals/penalties), and the margin (if any) around the planning target volume (PTV) used to aid coverage. Conventional stereotactic radiotherapy (SRT) treatments typically involve non-coplanar beams since there is often an advantage in terms of cranial organ at risk (OAR) sparing. IMRT can also benefit from such a configuration. The balance between target coverage and OAR sparing is largely controlled by user-defined goal doses and penalties. Once optimisation has been performed, intensity maps can be discretised into a selected number of levels. Less levels means less field segments and thus a shorter treatment time. Although IMRT beams attempt to spare structures which are in the 'beam's eye view' (BEV) of the target volume, sparing is greater if beams which minimise the involvement of OARs in their view are used. It has been found that the use of a margin is an effective way to ensure adequate PTV coverage. Alternatively the PTV penalties can be made larger. The best result is often obtained by the use of a 3-4 mm margin, whose penalty for underdosage is somewhat less than that for the PTV. Discretising the intensity maps to 4 or 5 levels is typically a good balance between shortening treatment time and not overly degrading the dose distribution. Beam configuration is still an important step in IMRT planning, even though optimisation of intensity maps is

  3. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  4. Qualified Health Plan (QHP) Landscape

    Data.gov (United States)

    U.S. Department of Health & Human Services — QHP Landscape Files present basic information about certified Qualified Health Plans and Stand-alone Dental Plans for individuals-families and small businesses...

  5. Preferred Provider Organization (PPO) Plans

    Science.gov (United States)

    ... Find & compare doctors, hospitals, & other providers Preferred Provider Organization (PPO) Plans How PPO Plans Work A Medicare ... extra for these benefits. Related Resources Health Maintenance Organization (HMO) Private Fee-for-Service (PFFS) Special Needs ...

  6. Health Maintenance Organization (HMO) Plan

    Science.gov (United States)

    ... Find & compare doctors, hospitals, & other providers Health Maintenance Organization (HMO) Plan In most HMO Plans, you generally ... certain service when needed. Related Resources Preferred Provider Organization (PPO) Private Fee-for-Service (PFFS) Special Needs ...

  7. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  8. Space Station Freedom operations planning

    Science.gov (United States)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  9. Strategic planning and managerial control

    OpenAIRE

    Mihaela Ghicajanu

    2004-01-01

    In this paper present relationship among strategic planning and managerial control process. For begin I want present few elements about strategic planning and managerial control in order to identify link inter these elements.

  10. The instruments of financial planning

    OpenAIRE

    Durnov, V.

    2011-01-01

    The paper analyzes financial planning efficiency for enterprise management improvement. The author describes the system of financial tools and considers in detail financial planning methods, their strengths and weaknesses

  11. Planning and User Interface Affordances

    National Research Council Canada - National Science Library

    St. Amant, Robert

    1999-01-01

    .... We identify a number of similarities between executing plans and interacting with a graphical user interface, and argue that affordances for planning environments apply equally well to user interface environments...

  12. Urban Farm Business Plan Handbook

    Science.gov (United States)

    The Urban Farm Business Plan Handbook (this document) provides guidance for developing a business plan for the startup and operation of an urban farm. It focuses on food and non-food related cultivated agriculture.

  13. The interventional radiology business plan.

    Science.gov (United States)

    Beheshti, Michael V; Meek, Mary E; Kaufman, John A

    2012-09-01

    Strategic planning and business planning are processes commonly employed by organizations that exist in competitive environments. Although it is difficult to prove a causal relationship between formal strategic/business planning and positive organizational performance, there is broad agreement that formal strategic and business plans are components of successful organizations. The various elements of strategic plans and business plans are not common in the vernacular of practicing physicians. As health care becomes more competitive, familiarity with these tools may grow in importance. Herein we provide an overview of formal strategic and business planning, and offer a roadmap for an interventional radiology-specific plan that may be useful for organizations confronting competitive and financial threats. Copyright © 2012 SIR. Published by Elsevier Inc. All rights reserved.

  14. Professional analysis in spatial planning

    Directory of Open Access Journals (Sweden)

    Andrej Černe

    2005-12-01

    Full Text Available Spatial analysis contributes to accomplishment of the three basic aims of spatial planning: it is basic element for setting spatial policies, concepts and strategies, gives basic information to inhabitants, land owners, investors, planners and helps in performing spatial policies, strategies, plans, programmes and projects. Analysis in planning are generally devoted to: understand current circumstances and emerging conditions within planning decisions; determine priorities of open questions and their solutions; formulate general principles for further development.

  15. 105-C Facility characterization plan

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    This facility characterization plan is a site-specific document that describes how quantification and qualification of the radiological sources and the radioactive contamination in the 105-C Building will be accomplished. Characterization of hazardous materials will be addressed in a separate plan. This plan was developed from review of video tapes, photographs, and records. The purpose of this characterization plan is to provide an efficient and cost-effective method for determining the distribution of radioactive contamination at the 105-C Facility

  16. Practical planning extending the classical AI planning paradigm

    CERN Document Server

    Wilkins, David E

    2014-01-01

    Planning, or reasoning about actions, is a fundamental element of intelligent behavior--and one that artificial intelligence has found very difficult to implement. The most well-understood approach to building planning systems has been under refinement since the late 1960s and has now reached a level of maturity where there are good prospects for building working planners. Practical Planning is an in-depth examination of this classical planning paradigm through an intensive case study of SIPE, a significantly implemented planning system. The author, the developer of SIPE, defines the plann

  17. Strategic Planning for Higher Education.

    Science.gov (United States)

    Kotler, Philip; Murphy, Patrick E.

    1981-01-01

    The framework necessary for achieving a strategic planning posture in higher education is outlined. The most important benefit of strategic planning for higher education decision makers is that it forces them to undertake a more market-oriented and systematic approach to long- range planning. (Author/MLW)

  18. Effective planning for internal audit

    OpenAIRE

    Cirtautas, Marius

    2016-01-01

    The purpose of this thesis is to find a way to effectively plan for internal audit. Conditions necessary for effective planning are formulated by using analysis of scientific literature. In second part author suggests a model for effective internal audit planning. In third part model is applied and analyzed using a case study.

  19. Strategic Planning: Shaping Future Success

    Science.gov (United States)

    2016-09-01

    fielding, the PM may also be planning for future increments , sustainment and other long-term ef- forts. Strategic planning can help the PM position these...introduced the Planning, Programming, and Budgeting System (PPBS) to the DoD. Prior to that, the DoD’s budget - ing focused on areas such as overhead

  20. Integrating financial and strategic planning.

    Science.gov (United States)

    Pivnicny, V C

    1989-09-01

    As hospitals face mounting profitability and liquidity concerns, the need to integrate strategic and financial planning also will continue to grow. This article describes a process for integrating these planning functions and the ideal organizational framework to facilitate the process. Obstacles to the integration of these planning processes also are discussed.