WorldWideScience

Sample records for beam dumping system

  1. High intensity beam dump for the Tevatron beam abort system

    International Nuclear Information System (INIS)

    Kidd, J.; Mokhov, N.; Murphy, T.; Palmer, M.; Toohig, T.; Turkot, F.; VanGinneken, A.

    1981-01-01

    The beam abort system proposed for the Fermilab Tevatron Accelerator will extract the proton beam from the ring in a single turn (approximately 20/mu/s) and direct it to an external beam dump. It is the function of the beam dump to absorb the unwanted beam and limit the escaping radiation to levels that are acceptable to the surrounding populace and apparatus. A beam dump that is expected to meet these requirements has been designed and constructed. Detailed design of the dump, including considerations leading to the choice of materials, are given. 6 refs

  2. LHC beam dumping system Extraction channel layout and acceptance

    CERN Document Server

    Goddard, B; Uythoven, J; Veness, R; Weterings, W

    2003-01-01

    The LHC beam dumping system must safely abort the LHC beams under all conditions, including those resulting from abnormal behaviour of machine elements or subsystems of the beam dumping system itself. The extraction channels must provide sufficient aperture both for the circulating and extracted beams, over the whole energy range and under various beam parameters. These requirements impose tight constraints on the tolerances of various extraction channel components, and also on the allowed range of beam positions in the region of these components. Operation of the beam dumping system under various fault states has been considered, and the resulting apertures calculated. After describing briefly the beam dumping system and the extraction channel geometry, the various assumptions made in the analysis are presented, before deriving tolerance limits for the relevant equipment and beam parameters.

  3. LHC beam dump system Consequences of abnormal operation

    CERN Document Server

    Kramer, T; Uythoven, J

    2010-01-01

    The LHC beam dump system is one of the most critical systems concerning machine protection and safe operation. It is used to dispose of high intensity beams between 450 GeV and 7 TeV. Studies into the consequences of abnormal beam dump actions have been performed. Different error scenarios have been evaluated using particle tracking in MAD-X, including an asynchronous dump action, and the impact of different orbit and collimator settings. Losses at locations in the ring and the beam dump transfer lines have been quantified as a function of different settings of the dump system protection elements. The implications for the setting up and operation of these protection elements are discussed.

  4. The LHC Beam Dumping System Trigger Synchronisation and Distribution System

    CERN Document Server

    Antoine, A; Voumard, N

    2005-01-01

    Two LHC beam dumping systems (LBDS) will fast-extract the counter-rotating beams safely from the LHC collider during setting-up of the accelerator, at the end of a physics run and in case of emergencies. They consist of 15 fast pulsed magnets per ring for beam extraction from the accelerator combined with 10 fast pulsed magnets for horizontal and vertical beam dilution. Dump requests will come from 3 different sources: the machine protection system for emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These spontaneously issued dump requests will be synchronised with the 3 µs beam abort gap within a fail-safe trigger synchronisation unit (TSU) based on a digital phase lock loop (DPLL) locked on the beam revolution frequency with a maximum phase error of 40 ns. Afterwards, the synchronised trigger pulse will be distributed to the fast pulsed magnet high voltage generators through a redundant fault tolerant trigger distribution system based on the...

  5. Design study of the SPS beam dumping system

    CERN Document Server

    Faugeras, Paul E; Schröder, G H

    1973-01-01

    An internal beam dumping system is needed for the SPS, in order to prevent uncontrolled loss of the beam in the accelerator. Several possible dumping schemes have been studied and compared in Ref. (1), and the method using fast kicker magnets has been chosen. The beam dumping system will use a pair of kicker magnets, which deflect the beam verti-cally onto the absorber blocks, and the beam will be dumped in one SPS revolution. It has been shown$^{(1)}$ that dumping a ow emittance beam of 10$^{13}$ ppp at 400 GeV/c leads to severe thermal problems in the absorber blocks. In particular, dumping the beam with fast kickers induces in the absorber blocks instantaneous temperature rises. These depend on the proton density distributions in the beam and the material used for the block and can be at least as high as l000$^{°}$C in case of aluminium. Although the values of these temperature spikes cannot be calculated with good accuracy, they are certainly higher than permitted for a reliable absorber block design. It...

  6. Initial results from beam commissioning of the LHC beam dump system

    CERN Document Server

    Goddard, B; Carlier, E; Ducimetière, L; Gallet, E; Gyr, M; Jensen, L; Jones, R; Kain, V; Kramer, T; Lamont, M; Meddahi, M; Mertens, V; Risselada, Thys; Uythoven, J; Wenninger, J; Weterings, W

    2010-01-01

    Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of the extraction channels and kicker performance derived from dilution sweep shapes are presented. The performance of the other equipment subsystems is summarised, in particular that of the dedicated dump system beam instrumentation.

  7. Performance with lead ions of the LHC beam dump system

    CERN Document Server

    Bruce, R; Jensen, L; Lefèvre, T; Weterings, W

    2007-01-01

    The LHC beam dump system must function safely with 208Pb82+ions. The differences with respect to the LHC proton beams are briefly recalled, and the possible areas for performance concerns discussed, in particular the various beam intercepting devices and the beam instrumentation. Energy deposition simulation results for the most critical elements are presented, and the conclusions drawn for the lead ion operation. The expected performance of the beam instrumentation systems are reviewed in the context of the damage potential of the ion beam and the required functionality of the various safety and post-operational analysis requirements.

  8. Premature beam dumps in 2011

    CERN Document Server

    Albert, Markus

    2012-01-01

    The statistical analysis of all non-programmed beam dumps during the 2011 proton run is presented. The selection criteria of fills that got considered were that the beam intensity of each of the two beams exceeded at least 1e12 particles per beam in order to exclude all probe beam dumps and most of the MPS test dumps. A distribution of beam dump causes by system is shown, as well as the time it took to re-establish injection after a non-programmed dump for fills which made it into STABLE BEAMS. This was done in an attempt to evaluate the cost of those non-programmed dumps in terms of time.

  9. 40 kA dumping system for the ISR beams

    International Nuclear Information System (INIS)

    Schnuriger, J.C.

    1975-01-01

    The kinetic energy of the proton beam of each ISR is W = I x E x T/sub rev/. With the maximum value of current achieved so far in the ISR I approximately equal to 30 A, a proton energy E = 26 GeV, and a revolution time T/sub rev/ = 3.15 μs, the result is a maximum kinetic energy of W = 2.45 MJ. Such an energy, if suddenly lost and instantaneously dissipated in any part of the ISR, would cause a major breakdown. It was therefore necessary to build a fast and reliable system which could dump the beam whenever safety monitors indicated a hardware fault or a beam loss. The beam in each ISR is dumped by means of four fast pulsed magnets deflecting the particles vertically onto an absorber block situated in the same long straight section. In 1970, when the ISR was first put into operation, each of the four magnets in each ring was energized independently by its own 3 Ω pulse generator. By means of a special spark-gap developed for that purpose, and by switching together the four 3 Ω pulse-forming networks, it was possible to improve significantly the reliability of the system. The 0.75 OMEGA, 40 kA pulse generator now energizing the four fast pulsed magnets is described, with special attention given to the principles and technological solutions which were adopted in order to achieve the necessary reliability of the system for each type of operation, particularly during long colliding beam experiments. (auth)

  10. The beam dump tunnels

    CERN Multimedia

    Patrice Loïez

    2002-01-01

    In these images workers are digging the tunnels that will be used to dump the counter-circulating beams. Travelling just a fraction under the speed of light, the beams at the LHC will each carry the energy of an aircraft carrier travelling at 12 knots. In order to dispose of these beams safely, a beam dump is used to extract the beam and diffuse it before it collides with a radiation shielded graphite target.

  11. Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System

    CERN Document Server

    Vatansever, Volkan

    The nominal stored energy in each LHC beam is 360 MJ, surpassing the beam energy of other accelerators by orders of magnitude. This energy threatens to damage accelerator components in case of uncontrolled beam losses To avoid damage of accelerator equipment due to impacting beam, the controlled removal of the LHC beams from the collider rings towards the dump block must be guaranteed at all times. Therefore, the LHC Beam Dumping System was built according to high reliability standards. To further reduce the risk of incapability to dump the beams in case of correlated failures in the redundant system, a new direct link from the LHC Beam Interlock System to the Re-triggering Lines of the LHC Beam Dumping System will be implemented for the startup with beam in 2015. This link represents a diverse redundancy to the current implementation, which should neither significantly increase the risk for so-called Asynchronous Beam Dumps nor compromise machine availability. Therefore, a reliability analysis down to the co...

  12. The Beam Energy Tracking System of the LHC Beam Dumping System

    CERN Document Server

    Barlow, R A; Carlier, E; Gräwer, G; Voumard, N; Gjelsvik, R

    2005-01-01

    The LHC Beam Dumping System (LBDS) of the Large Hadron Collider (LHC), presently under construction at CERN, will be installed around the straight section 6. It comprises per ring 15 horizontally deflecting extraction kickers, followed by 1 quadrupole, 15 vertically deflecting steel septum magnets, 10 dilution kickers and, in a separate cavern several hundred meters away, an external absorber assembly. A beam dump request can occur at any moment during the operation of the collider, from injection at 450 GeV up to top energy at 7 TeV. The Beam Energy Tracking System (BETS) monitors the deflection strength of each active element of the LBDS with respect to the beam energy in order to guarantee the correct extraction trajectory over the complete operational range and under all operational conditions. Its main functions are the acquisition of the beam energy, the generation of the kick strength reference signals for the extraction and dilution kickers, the continuous checking that the kicker high voltage generat...

  13. Dependability analysis of a safety critical system the LHC beam dumping system at CERN

    CERN Document Server

    Filippini, R

    2006-01-01

    This thesis presents the dependability study of the Beam Dumping System of the Large Hadron Collider (LHC), the high energy particle accelerator to be commissioned at CERN in summer 2007. There are two identical, independent LHC Beam Dumping Systems (LBDS), one per LHC beam, each consisting of a series of magnets that extract the particle beam from the LHC ring into the extraction line leading to the absorbing block. The consequences of a failure within the LBDS can be very severe. This risk is reduced by applying redundancy to the design of the most critical components and on-line surveillance that, in case of a detected failure, issues a safe operation abort, called false beam dump. The system has been studied applying Failure Modes Effects and Criticality Analysis (FMECA) and reliability prediction. The system failure processes have been represented with a state transition diagram, governed by a Markov regenerative stochastic process, and analysed for different operational scenarios for one year of operati...

  14. LHC beam dump system : analysis of beam commissioning, performance and the consequences of abnormal operation

    International Nuclear Information System (INIS)

    Kramer, T.

    2011-01-01

    The LHC accelerates proton beams to a momentum of up to 7 TeV/c. At this energy level and with nominal beam intensity the stored energy of 360 MJ per beam is sufficient to melt 500 kg of copper. In addition up to 10 GJ are stored within the LHC magnet system at top energy. lt is obvious that such a machine needs well designed safety and protection systems. The LHC Beam Dump System (LBDS) is such a system and one of the most critical once concerning machine protection and safe operation. lt is used to dispose of high intensity beams between 450 GeV and 7 TeV and is thus designed to fast extract beam in a loss free way and to transfer it to an external absorber. For each ring systems of 15 horizontal fast kicker magnets (MKD), 15 vertically deflecting magnetic septa (MSD) and 10 diluter kicker magnets (MKB) are installed. This thesis is concerned with the analysis of the LBDS performance under normal operating parameters as well as under abnormal conditions like in the event of asynchronous beam abort or missing MKD elements. Therefore a sophisticated simulation environment was developed based on the use of the MAD-X tracking code. A system of tracking jobs was set up to study failure cases and losses for various dump events. Those jobs can be distributed to available CPU power and be calculated in parallel. Studies into the consequences of abnormal beam dump actions have been performed. Different error scenarios have been evaluated including an asynchronous dump action, prefire cases, and the impact of different orbit and collimator settings. Losses at locations in the ring and the beam dump transfer lines have been quantified as a function of different settings of the dump system protection elements. The implications for the setup and operation of these protection elements are discussed. Particle distributions can be created according to the used orbit. Simulations with different orbit parameters (including magnet field errors, beam position read out errors

  15. Changes to the LHC Beam Dumping System for LHC Run 2

    CERN Document Server

    Uythoven, Jan; Borburgh, Jan; Carlier, Etienne; Gabourin, Stéphane; Goddard, Brennan; Magnin, Nicolas; Senaj, Viliam; Voumard, Nicolas; Weterings, Wim

    2014-01-01

    The LHC beam dumping system performed according to expectations during Run 1 of the LHC (2009 – 2013). A brief overview of the experience is given, including a summary of the observed performance by comparison to expectations. An important number of changes are applied to the beam dumping system during the present Long Shutdown in order to further improve its safety and performance. They include the addition of a direct link between the Beam Interlock System and the re-triggering system of the dump kickers, the modification of the uninterrupted electrical power distribution architecture, the upgrade of the HV generators, the consolidation of the trigger synchronisation system, the modifications to the triggering system of the power switches and the changes to the dump absorbers TCDQ.

  16. Reliability Analysis of the LHC Beam Dumping System Taking into Account the Operational Experience during LHC Run 1

    CERN Document Server

    Filippini, R; Magnin, N; Uythoven, J A

    2014-01-01

    The LHC beam dumping system operated reliably during the Run 1 period of the LHC (2009 2013). A number of internal failures of the beam dumping system occurred that, because of built-in safety features, resulted in a safe removal of the particle beams from the machine, so called “internal beam

  17. LHC Beam Dump System: Analysis of beam commissioning, performance and the consequences of abnormal operation

    CERN Document Server

    Kramer, Thomas

    2011-01-01

    The LHC accelerates proton beams to a momentum of up to 7 TeV/c. At this energy level and with nominal beam intensity the stored energy of 360 MJ per beam is sufficient to melt 500 kg of copper. In addition up to 10 GJ are stored within the LHC magnet system at top energy. It is obvious that such a machine needs well designed safety and protection systems. The LHC Beam Dump System (LBDS) is such a system and one of the most critical once concerning machine protection and safe operation. It is used to dispose of high intensity beams between 450 GeV and 7 TeV and is thus designed to fast extract beam in a loss free way and to transfer it to an external absorber. For each ring systems of 15 horizontal fast kicker magnets (MKD), 15 vertically deflecting magnetic septa (MSD) and 10 diluter kicker magnets (MKB) are installed. This thesis is concerned with the analysis of the LBDS performance under normal operating parameters as well as under abnormal conditions like in the event of asynchronous beam abort or missin...

  18. Safety Analysis of the Movable Absorber TCDQ in the LHC Beam Dumping System

    CERN Document Server

    Filippini, R

    2009-01-01

    The LHC Beam Dumping System nominally dumps the beam synchronously with the passage of the particle free beam abort gap at the beam dump extraction kickers. In the case of an asynchronous beam dump the TCDQ absorber protects the machine aperture. It is a single sided collimator, positioned close to the beam and it has to follow the beam position and beam size during the energy ramp. This report assesses the different failure scenarios of TCDQ positioning and their likelihood. The failure probability for the two TCDQ systems together is estimated to be 3.6 E-05 (mean value) for one year of LHC operation. This corresponds to a SIL4 safety level, which is considered sufficient. The three dominant failure modes are highlighted. The calculated failure probability refers to scenarios that are generated and developed inside the TCDQ system. Potential failure sources not included are the interaction with external systems: the transmission of the start signal to the PLC from a dedicated timing card and the manual opti...

  19. Implementation of a Direct Link between the LHC Beam Interlock System and the LHC Beam Dumping System Re-Triggering Lines

    CERN Document Server

    Gabourin, S; Denz, R; Magnin, N; Uythoven, J; Wollmann, D; Zerlauth, M; Vatansever, V; Bartholdt, M; Bertsche, B; Zeiler, P

    2014-01-01

    To avoid damage of accelerator equipment due to impacting beam, the controlled removal of the LHC beams from the collider rings towards the dump blocks must be guaranteed at all times. When a beam dump is demanded, the Beam Interlock System communicates this request to the Trigger Synchronisation and Distribution System of the LHC Beam Dumping System. Both systems were built according to high reliability standards. To further reduce the risk of incapability to dump the beams in case of correlated failures in the Trigger Synchronisation and Distribution System, a new direct link from the Beam Interlock System to the re-triggering lines of the LHC Beam Dumping System will be implemented for the start-up with beam in 2015. The link represents a diverse redundancy to the current implementation, which should neither significantly increase the risk for so-called asynchronous beam dumps nor compromise machine availability. This paper describes the implementation choices of this link. Furthermore the results of a rel...

  20. Abort Gap Cleaning using the Transverse Feedback System Simulation and Measurements in the SPS for the LHC Beam Dump System

    CERN Document Server

    Koschik, A; Höfle, Wolfgang; Kotzian, G; Kramer, Daniel; Kramer, T

    2008-01-01

    The critical and delicate process of dumping the beams of the LHC requires very low particle densities within the $3 \\mu$s of the dump kicker rising edge. High beam population in this so-called 'abort gap' might cause magnet quenches or even damage. Constant refilling due to diffusion processes is expected which will be counter-acted by an active abort gap cleaning system employing the transverse feedback kickers. In order to assess the feasibility and performance of such an abort gap cleaning system, simulations and measurements with beam in the SPS have been performed. Here we report on the results of these studies.

  1. The Performance of the New TCDQ System in the LHC Beam Dumping Region

    CERN Document Server

    Presland, Andrew; Weterings, Wim

    2005-01-01

    The superconducting quadrupole magnet Q4 and other downstream LHC machine elements risk destruction in the event of a beam dump that is not synchronised with the abort gap. In order to protect these elements, a single sided mobile graphite diluter block TCDQ, in combination with a two-sided secondary collimator TCS and iron shield TCDQM, will be installed in front of Q4. This protection system should also intercept spurious particles in the beam abort gap to prevent quenches from occurring during regular beam aborts, and must also intercept the particles from the secondary halo during low beam lifetime without provoking quenches. The conceptual design of the TCDQ system is briefly presented, with the load conditions and performance criteria. The FLUKA simulations are described results discussed in the context of the expected performance levels for LHC operation.

  2. Dumping the decelerated beams of CLIC

    CERN Document Server

    Jeanneret, Bernard

    2011-01-01

    The spent drive beam must be cleanly extracted and bent away from the decelerator axis at the end of each CLIC decelerator in order to leave space for injecting a fresh beam train in the next sector. Then the spent beam must be safely absorbed. A compact extraction system made of a single dipole is proposed. The spent beam is driven to a water dump located at 20m downstream of the extraction point and transversely 6m away of the axis of the main linac. An adequate spread of the beam impact map on the dump offers small temperature excursions in both the dump and its entrance window, allowing for reliable operation and a long lifetime of the system.

  3. Reliability Analysis of the Trigger Synchronisation and Distribution System of the LHC Beam Dumping System

    CERN Document Server

    Filippini, R

    2013-01-01

    The Trigger Synchronisation and Distribution System (TSDS) is one of the core components of the LHC Beam Dumping System and an essential element to guarantee that operation with the beam is always safe. The most critical failure of the TSDS is the missed trigger and re-trigger of at least 2 MKD magnets. This report presents the modelling and analysis of the likelihood of the TSDS to develop such a failure scenario during operation. The analysis returns the Safety Integrity Level (SIL) for the TSDS, and the list of the most important contributors. Sensitivity analysis is performed with respect to the failure parameters and with respect to failure dependencies among components that are in the redundant sets. This includes a study of the common cause failures that are in the TSDS architecture. The results in terms of SIL for the TSDS will be compared to the SIL for the previous architecture which was operational until the Long Shutdown 1. Recommendations in order to obtain higher safety by design will also be gi...

  4. High power electron beam dumps at CEBAF

    International Nuclear Information System (INIS)

    Wiseman, M.; Sinclair, C.K.; Whitney, R.; Zarecky, M.

    1997-01-01

    The CEBAF accelerator produces a very small emittance CW electron beam of up to 200 μA average current. The resulting beam power, up to 1 MW at 5 GeV, and the very high beam power density, pose challenging problems for beam dump design. Two styles of high power dumps have been developed. The first, rated for 100+ kW, is used for beam tune-up and accelerator commissioning. The beam power is entirely contained in metal in this dump, minimizing the problems associated with radioactive water handling. Full power 1 MW dumps are used with the experimental halls. In these dumps, one-third of the beam power is directly absorbed in water. Both dump designs require the beam to be rastered when the smallest beam sizes are used. Design details for each of these dumps will be presented

  5. A high current sinusoidal pulse generator for the diluter magnets of the LHC beam dump system

    CERN Document Server

    Vossenberg, Eugène B; Ducimetière, L; Schröder, G H

    2000-01-01

    CERN is constructing the Large Hadron Collider (LHC), a superconducting accelerator that will collide protons at a center of mass energy of 14 TeV. The two colliding beams will each store an energy of up to 540 MJ, which must be safely deposited within one beam revolution of 89 mu s on two external absorbers located about 700 m from the extraction points at the end of dedicated extraction tunnels. To avoid evaporation of the graphite absorber material by the very high energy density of the incident beams, the deposition area of the beams on the absorber front face will be increased. This is done by a pair of sinusoidally powered orthogonal magnet systems producing approximately an e-shape figure of about 35 mm diameter, with a minimum velocity of 10 mm/ mu s during the dumping process. The pulse generators of the horizontally and vertically deflecting diluter magnets are composed of capacitor banks, discharged by stacks of solid state closing switches. They are connected to the magnets by 28 m long low induct...

  6. Design of the LHC beam dump

    International Nuclear Information System (INIS)

    Ferrari, A.; Stevenson, G.R.; Weisse, E.

    1992-01-01

    The severe constraints on the beam dumping system for the proposed Large Hadron Collider (LHC) arising from the beam energy (7.7 TeV) and intensity (5x10 14 protons) call for unusual procedures to dilute the beam. Monte-Carlo cascade simulations which calculated the effectiveness of thin scatterers placed upstream of the main absorber have been corrected and updated. Results are also presented concerning the optimization of the thicknesses of such scatterers. These show that a combined sweeping plus double-scatterer system gives a reasonable safety margin. A system combining the sweeping procedure with a dump where the absorber blocks are interleaved with air gaps could produce comparable dilution of the deposited energy. (author) 6 refs.; 3 figs

  7. Construction of a new Tevatron collider beam abort dump

    International Nuclear Information System (INIS)

    Hanna, B.; Crawford, C.

    1991-01-01

    As part of the Collider upgrade a new abort system is to be installed in the Tevatron at AO. It consists of two sets of fast kickers and two 90% full aperture graphite beam dumps. This system will abort both protons and antiprotons. Details of the beam dump design and construction are presented

  8. High and low energy gamma beam dump designs for the gamma beam delivery system at ELI-NP

    International Nuclear Information System (INIS)

    Yasin, Zafar; Matei, Catalin; Ur, Calin A.; Mitu, Iani-Octavian; Udup, Emil; Petcu, Cristian

    2016-01-01

    The Extreme Light Infrastructure - Nuclear Physics (ELI-NP) is under construction in Magurele, Bucharest, Romania. The facility will use two 10 PW lasers and a high intensity, narrow bandwidth gamma beam for stand-alone and combined laser-gamma experiments. The accurate estimation of particle doses and their restriction within the limits for both personel and general public is very important in the design phase of any nuclear facility. In the present work, Monte Carlo simulations are performed using FLUKA and MCNPX to design 19.4 and 4 MeV gamma beam dumps along with shielding of experimental areas. Dose rate contour plots from both FLUKA and MCNPX along with numerical values of doses in experimental area E8 of the facility are performed. The calculated doses are within the permissible limits. Furthermore, a reasonable agreement between both codes enhances our confidence in using one or both of them for future calculations in beam dump designs, radiation shielding, radioactive inventory, and other calculations releated to radiation protection. Residual dose rates and residual activity calculations are also performed for high-energy beam dump and their effect is negligible in comparison to contributions from prompt radiation.

  9. High and low energy gamma beam dump designs for the gamma beam delivery system at ELI-NP

    Energy Technology Data Exchange (ETDEWEB)

    Yasin, Zafar, E-mail: zafar.yasin@eli-np.ro; Matei, Catalin; Ur, Calin A.; Mitu, Iani-Octavian; Udup, Emil; Petcu, Cristian [Extreme Light Infrastructure - Nuclear Physics / Horia Hulubei National Institute for R& D in Physics and Nuclear Engineering, Bucharest-Magurele (Romania)

    2016-03-25

    The Extreme Light Infrastructure - Nuclear Physics (ELI-NP) is under construction in Magurele, Bucharest, Romania. The facility will use two 10 PW lasers and a high intensity, narrow bandwidth gamma beam for stand-alone and combined laser-gamma experiments. The accurate estimation of particle doses and their restriction within the limits for both personel and general public is very important in the design phase of any nuclear facility. In the present work, Monte Carlo simulations are performed using FLUKA and MCNPX to design 19.4 and 4 MeV gamma beam dumps along with shielding of experimental areas. Dose rate contour plots from both FLUKA and MCNPX along with numerical values of doses in experimental area E8 of the facility are performed. The calculated doses are within the permissible limits. Furthermore, a reasonable agreement between both codes enhances our confidence in using one or both of them for future calculations in beam dump designs, radiation shielding, radioactive inventory, and other calculations releated to radiation protection. Residual dose rates and residual activity calculations are also performed for high-energy beam dump and their effect is negligible in comparison to contributions from prompt radiation.

  10. Results from the LHC Beam Dump Reliability Run

    CERN Document Server

    Uythoven, J; Carlier, E; Castronuovo, F; Ducimetière, L; Gallet, E; Goddard, B; Magnin, N; Verhagen, H

    2008-01-01

    The LHC Beam Dumping System is one of the vital elements of the LHC Machine Protection System and has to operate reliably every time a beam dump request is made. Detailed dependability calculations have been made, resulting in expected rates for the different system failure modes. A 'reliability run' of the whole system, installed in its final configuration in the LHC, has been made to discover infant mortality problems and to compare the occurrence of the measured failure modes with their calculations.

  11. Dilution kicker for the SPS beam dump

    CERN Multimedia

    1974-01-01

    In order to reduce thermal stress on the SPS dump material, the fast-ejected beam was swept horizontally across the dump. This was done with the "dilution kicker" MKDH, still in use at the time of writing. The person on the left is Manfred Mayer. See also 7404072X.

  12. Dilution kicker for the SPS beam dump

    CERN Multimedia

    1974-01-01

    In order to reduce thermal stress on the SPS dump material, the fast-ejected beam was swept horizontally across the dump. This was done with the "dilution kicker" MKDH, still in use at the time of writing. See also 7402051X.

  13. SPIDER beam dump as diagnostic of the particle beam

    Energy Technology Data Exchange (ETDEWEB)

    Zaupa, M., E-mail: matteo.zaupa@igi.cnr.it; Sartori, E. [Università degli Studi di Padova, Via 8 Febbraio 2, Padova 35122 (Italy); Consorzio RFX, Corso Stati Uniti 4, Padova 35127 (Italy); Dalla Palma, M.; Brombin, M.; Pasqualotto, R. [Consorzio RFX, Corso Stati Uniti 4, Padova 35127 (Italy)

    2016-11-15

    The beam power produced by the negative ion source for the production of ion of deuterium extracted from RF plasma is mainly absorbed by the beam dump component which has been designed also for measuring the temperatures on the dumping panels for beam diagnostics. A finite element code has been developed to characterize, by thermo-hydraulic analysis, the sensitivity of the beam dump to the different beam parameters. The results prove the capability of diagnosing the beam divergence and the horizontal misalignment, while the entity of the halo fraction appears hardly detectable without considering the other foreseen diagnostics like tomography and beam emission spectroscopy.

  14. TCDQ-TCT retraction and losses during asynchronous beam dump

    CERN Document Server

    Bracco, Chiara; Quaranta, Elena; CERN. Geneva. ATS Department

    2016-01-01

    The protection provided by the TCDQs in case of asynchronous beam dump depends strongly on their correct setup. They have to respect the strict hierarchy of the full collimation system and shield the tertiary collimators in the experimental regions. This MD aimed at performing asynchronous beam dump tests with different configurations, in order to assess the minimum allowed retraction between TCTs and TCDQs and, as a consequence, on the The protection provided by the TCDQs in case of asynchronous beam dump depends strongly on their correct setup. They have to respect the strict hierarchy of the full collimation system and shield the tertiary collimators in the experimental regions. This MD aimed at performing asynchronous beam dump tests with different configurations, in order to assess the minimum allowed retraction between TCTs and TCDQs and, as a consequence, on the β* reach.

  15. Beam dump experiments at the AGS

    International Nuclear Information System (INIS)

    Soukas, A.; Bregman, M.; Galik, R.

    1978-01-01

    Searches for the prompt production of weak or semi-strongly interacting particles in a neutrino beam dump and their subsequent interaction or decay were performed at the AGS. The experiment is detailed using the totally active liquid scintillator detector, and mention the results of the spark chamber detector. An exposure of a copper beam dump to two orders of magnitude more protons than in previous searches at 28 GeV has yielded 104 neutrino-like events in the detector. The events from the beam dump are compared directly with those from π and K decay neutrinos produced concurrently in the normal long neutrino decay path following a 15 cm brass target. The characteristics of the events are similar. However, when compared to the rate of events predicted by scaling the 15 cm target yields, the beam dump data show an excess of 45 +- 16 events. The excess events from the beam dump appear to deposit energies greater than or equal to 1 GeV. Their source remains puzzling. Future experiments at the AGS could verify the existence of the effect, decrease the uncertainty in the predicted number of events from 30 to 10% by directly measuring the pion absorption length with a variable density target, search for threshold effects, and measure the sign of the charge of the existing muons. 22 references

  16. ATA diagnostic beam dump conceptual design

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-01

    A diagnostic beam dump, able to withstand 72,000 pulses (10 kA, 50 MeV/pulse) per shift was designed and analyzed. The analysis shows that the conceptual beam dump design consisting of 80 vitreous carbon plate-foam elements is able to withstand the thermal and mechanical stresses generated. X-rays produced by bremsstrahlung are absorbed by a three element copper plate-foam x-ray absorber. Cooling between bursts of electron pulses is provided by pressurized helium.

  17. Design of the MI40 beam-abort dump

    International Nuclear Information System (INIS)

    Bhat, C.M.; Martin, P.S.; Russell, A.D.

    1995-05-01

    A beam-abort dump for the Fermilab Main Injector to handle 3E13 protons per pulse at 150 Gev has been designed. A 120 GeV beam line goes through the beam-dump off-set by 27cm from its center. The design and the environmental safety aspects of the beam-dump are described here

  18. Upgrade of the LHC Beam Dumping Protection Elements

    CERN Document Server

    Weterings, W; Balhan, B; Borburgh, J; Goddard, B; Maglioni, C; Versaci, R

    2012-01-01

    The Beam Dumping System for the Large Hadron Collider comprises for each ring a set of horizontally deflecting extraction kicker magnets, vertically deflecting steel septa, dilution kickers and finally, a couple of hundred meters further downstream, an absorber block. A mobile diluter (TCDQ) protects the superconducting quadrupole immediately downstream of the extraction as well as the arc at injection energy and the triplet aperture at top energy from bunches with small impact parameters, in case of a beam dump that is not synchronized with the particle free gap or a spontaneous firing of the extraction kickers. Simulations have shown that an asynchronous dump of a 7 TeV nominal beam into the TCDQ absorber blocks could damage it. This paper describes the proposed changes to this device in order to maintain the protection for the downstream elements while reducing the risk of damaging the TCDQ in case of such a beam loss.

  19. Ion beam dump for JT-60 NBI

    International Nuclear Information System (INIS)

    Kuriyama, Masaaki; Horiike, Hiroshi; Matsuda, Shinzaburo; Morita, Hiroaki; Shibanuma, Kiyoshi

    1981-10-01

    The design of the active cooling type ion beam dump for JT-60 NBI which receives the total beam power of 5.6 MW for 10 sec continuously is described. It is composed of array of many finned tubes which is made of oxygen free copper with 0.2% silver content. The safety margin against thermal and mechanical troubles is estimated by the heat transfer and the thermal stress calculation. (author)

  20. Uncoupled thermoelasticity solutions applied on beam dumps

    Directory of Open Access Journals (Sweden)

    A. Ouzia

    2016-06-01

    Full Text Available In particle accelerators the process of beam absorption is vital. At CERN particle beams are accelerated at energies of the order of TeV. In the event of a system failure or following collisions, the beam needs to be safely absorbed by dedicated protecting blocks. The thermal shock caused by the rapid energy deposition within the absorbing block causes thermal stresses that may rise above critical levels. The present paper provides a convenient expression of such stresses under hypotheses described hereafter. The temperature field caused by the beam energy deposition is assumed to be Gaussian. Such a field models a non-diffusive heat deposition. These effects are described as thermoelastic as long as the stresses remain below the proportional limit and can be analytically modeled by the coupled equations of thermoelasticity. The analytical solution to the uncoupled thermoelastic problem in an infinite domain is presented herein and matched with a finite unit radius sphere. The assumption of zero diffusion as well as the validity of the match with a finite geometry is quantified such that the obtained solutions can be rigorously applied to real problems. Furthermore, truncated series solutions, which are not novel, are used for comparison purposes. All quantities are nondimensional and the problem reduces to a dependence of five dimensionless parameters. The equations of elasticity are presented in the potential formulation where the shear potential is assumed to be nil due to the source being a gradient and the absence of boundaries. Nevertheless equivalent three-dimensional stresses are computed using the compressive potential and optimized using standard analytical optimization methods. An alternative algorithm for finding the critical points of the three-dimensional stress function is presented. Finally, a case study concerning the proton synchrotron booster dump is presented where the aforementioned analytical solutions are used and the

  1. Iodine Beam Dump Design and Fabrication

    Science.gov (United States)

    Polzin, K. A.; Bradley, D. E.

    2017-01-01

    During the testing of electric thrusters, high-energy ions impacting the walls of a vacuum chamber can cause corrosion and/or sputtering of the wall materials, which can damage the chamber walls. The sputtering can also introduce the constituent materials of the chamber walls into an experiment, with those materials potentially migrating back to the test article and coating it with contaminants over time. The typical method employed in this situation is to install a beam dump fabricated from materials that have a lower sputter yield, thus reducing the amount of foreign material that could migrate towards the test article or deposit on anything else present in the vacuum facility.

  2. Proposal for the award of a contract without competitive tendering for the supply of coaxial high-voltage cable for the LHC beam dumping system

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract without competitive tendering for the supply of two types of coaxial high-voltage cable for the LHC beam dumping system. Following a market survey carried out among 14 firms in four Member States, a call for tenders (IT-2969/SL/LHC) was sent on 10 July 2001 to one firm. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with DRAKA MULTIMEDIA CABLE (DE), the only bidder, for the supply of 14 km of coaxial high-voltage cable for the LHC beam dumping system for a total amount of 530 488 euros (779 900 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 100%.

  3. Injection and Dump Systems

    CERN Document Server

    Bracco, C; Barnes, M J; Carlier, E; Drosdal, L N; Goddard, B; Kain, V; Meddahi, M; Mertens, V; Uythoven, J

    2012-01-01

    Performance and failures of the LHC injection and ex- traction systems are presented. In particular, a comparison with the 2010 run, lessons learnt during operation with high intensity beams and foreseen upgrades are described. UFOs, vacuum and impedance problems related to the injection and extraction equipment are analysed together with possible improvements and solutions. New implemented features, diagnostics, critical issues of XPOC and IQC applications are addressed.

  4. Experimental use of neutrinos from ISABELLE beam dumps

    International Nuclear Information System (INIS)

    Bozoki, G.E.; Thorndike, A.M.; Mann, A.K.

    1979-01-01

    The purpose of this paper is to emphasize the technical feasibility and possible applicability of using ISABELLE beam dumps as powerful sources for directed high energy neutrino bursts. In the present machine design two dump systems are applied to absorb the extracted fast beams. These systems are normally activated when a machine working period terminates or when the beams in the rings become somewhat anomalous. Disregarding the latter, emergency extractions, the expected normal beam extraction rate is 1 to 2 per day, when about (6.3 to 7.5) x 10 14 protons are hitting the external targets during a pulse length of 50 μsec. These protons are considered so far to be useless. The present interest in having neutrino beams at high energy and measurable intensity at very large (so to say, global) distances, however, suggests a natural application of these apparently useless protons: converting them into neutrinos. In other words, the proton dumps can serve as neutrino bursters. This does not mean that the ISABELLE neutrino bursters would compete with the dedicated neutrino beams of various laboratories such as FNAL. However, since they would provide 2 to 4 neutrino bursts per day during the whole lifetime of the machine (without disturbing the ISABELLE normal research program), these neutrino bursts might have importance for research activities that require years of continuous running of massive neutrino detectors. It is anticipated that among these activities the following would be included: (1) the study of coherent neutrino regeneration, (2) calibration and permanent testing of cosmic-ray and astrophysical neutrino detectors, (3) research on the practical applicability of neutrinos in telecommunication, and (4) certain astro- and geophysical applications

  5. High power semiconductor switches in the 12 kV, 50 kA pulse generator of the SPS beam dump kicker system

    CERN Document Server

    Bonthond, J; Faure, P; Vossenberg, Eugène B

    2001-01-01

    Horizontal deflection of the beam in the dump kicker system of the CERN SPS accelerator is obtained with a series of fast pulsed magnets. The high current pulses of 50 kA per magnet are generated with capacitor discharge type generators which, combined with a resistive free-wheel diode circuit, deliver a critically damped half-sine current with a rise-time of 25 ms. Each generator consists of two 25 kA units, connected in parallel to a magnet via a low inductance transmission line.

  6. Thermal analysis of the ATLAS dump system

    CERN Document Server

    Wichrowska Polok, I

    2003-01-01

    The dump system of the ATLAS Magnet, situated on third level of the USA15 cavern is an assembly of diodes and dump resistors through which the energy stored in the Magnet is dissipated when running down the magnet current to zero. The dump system is permanently connected to the Magnet through a system of bus bars and is able to dissipate about 1.5 GJ of energy in 3 hours. The goal of this thermal analysis, performed by ST/CV, is to understand whether the heat released by the dump system can be removed by free convection into the PX15 shaft or if forced ventilation is needed

  7. First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit

    CERN Document Server

    Antoine, A; Magnin, N; Juteau, P; Voumard, N

    2011-01-01

    Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 μs beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented f...

  8. Detailed mechanical design of the LIPAc beam dump radiological shielding

    Energy Technology Data Exchange (ETDEWEB)

    Nomen, Oriol, E-mail: onomen@irec.cat [IREC, Barcelona, Catalonia (Spain); CDEI-UPC, Barcelona, Catalonia (Spain); Martínez, José I.; Arranz, Fernando; Iglesias, Daniel; Barrera, Germán; Brañas, Beatriz [CIEMAT, Madrid (Spain); Ogando, Francisco [UNED, Madrid (Spain); Molla, Joaquín [CIEMAT, Madrid (Spain); Sanmartí, Manel [IREC, Barcelona, Catalonia (Spain)

    2013-10-15

    Highlights: ► Mechanical design of the IFMIF LIPAc beam dump shielding has been performed. ► Lead shutter design performed to shield radiation from beam dump when LIPAc is off. ► External loads, working and dismantling conditions, included as design constraints. -- Abstract: The LIPAc is a 9 MeV, D{sup +} linear prototype accelerator for the validation of the IFMIF accelerator design. The high intensity, 125 mA CW beam is stopped in a copper cone involving a high production of neutrons and gamma radiation and activation of its surface. The beam stopper is surrounded by a shielding to attenuate the resulting radiation so that dose rate values comply with the limits at the different zones of the installation. The shielding includes for that purpose polyethylene rings, water tanks and gray cast iron rings. A lead shutter has also been designed to shield the gamma radiation that comes through the beam tube when the linear accelerator is not in operation, in order to allow access inside the building for maintenance tasks. The present work summarizes the detailed mechanical design of the beam dump shielding and the lead shutter taking into account the design constraints, such as working conditions and other external loads, as well as including provisions for dismantling.

  9. Thermal analysis of injection beam dump of high-intensity rapid-cycling synchrotron in J-PARC

    Science.gov (United States)

    Kamiya, J.; Saha, P. K.; Yamamoto, K.; Kinsho, M.; Nihei, T.

    2017-10-01

    The beam dump at the beam injection area in the J-PARC 3-GeV rapid cycling synchrotron (RCS) accepts beams that pass through the charge exchange foil without ideal electron stripping during the multi-turn beam injection. The injection beam dump consists of the beam pipe, beam stopper, radiation shield, and cooling mechanism. The ideal beam power into the injection beam dump is 400 W in the case of design RCS extraction beam power of 1 MW with a healthy foil, which has 99.7 % charge stripping efficiency. On the other hand, as a radiation generator, the RCS is permitted to be operated with maximum average beam power of 4 kW into the injection beam dump based on the radiation shielding calculation, in consideration of lower charge stripping efficiency due to the foil deterioration. In this research, to evaluate the health of the RCS injection beam dump system from the perspective of the heat generation, a thermal analysis was performed based on the actual configuration with sufficiently large region, including the surrounding concrete and soil. The calculated temperature and heat flux density distribution showed the validity of the mesh spacing and model range. The calculation result showed that the dumped 4 kW beam causes the temperature to increase up to 330, 400, and 140 °C at the beam pipe, beam stopper, and radiation shield, respectively. Although these high temperatures induce stress in the constituent materials, the calculated stress values were lower than the ultimate tensile strength of each material. Transient temperature analysis of the beam stopper, which simulated the sudden break of the charge stripper foil, demonstrated that one bunched beam pulse with the maximum beam power does not lead to a serious rise in the temperature of the beam stopper. Furthermore, from the measured outgassing rate of stainless steel at high temperature, the rise in beam line pressure due to additive outgassing from the heated beam pipe was estimated to have a negligible

  10. Design and development of multi-megawatt beam dumps

    International Nuclear Information System (INIS)

    Haughian, J.M.; Cooper, W.S.; Paterson, J.A.

    1976-11-01

    The next generation of U.S. fusion experiments which includes TFTR, MFTF, and Doublet III, will utilize neutral-beam injection for plasma heating. TFTR, for example, desires 20 MW of 120-keV deuterium atoms in pulses of 0.5-sec duration. In order to meet these requirements, a 15-A, 120-keV, 0.5-sec pulse per minute module is presently under test at the neutral-beam test facility at the Lawrence Berkeley Laboratory. A 65-A, 120-keV, 0.5-sec module is under construction and is scheduled for assembly in April of this year. Some of the features of a calorimeter/beam dump that is presently being used in the testing and evaluation of these neutral beam sources are discussed

  11. Modernization of dump truck onboard system

    Science.gov (United States)

    Semenov, M. A.; Bolshunova, O. M.; Korzhev, A. A.; Kamyshyan, A. M.

    2017-10-01

    The review of the only automated dispatch system for the career dump trucks, which is presented in the domestic market, was made. A method for upgrading the loading control system and technological weighing process of the career dump was proposed. The cargo weight during loading is determined by the gas pressure in the suspension cylinders at the time of the oscillation ending and at the start of the vibration smoothing process; the smoothing speed correction is performed. The error of the cargo weighting is 2.5-3%, and of the technological weighing process during driving - 1%, which corresponds to the error level of the steady-state weighting means.

  12. Monte Carlo calculations for beam dump shield design for K-130 cyclotron at VECC

    International Nuclear Information System (INIS)

    Chatterjee, S.; Banerjee, K.; Roy, Pratap; Bhattacharya, C.; Bhattacharya, S.; Bandyopadhyay, T.

    2013-01-01

    In any accelerator based nuclear physics experiment most of incident beam passes through the target material and stopped in the beam dump. So the beam dump becomes the major source of neutron and γ-radiations. This contribution is much larger than that of actual neutron and γ-rays produced from the nuclear reactions with target nuclei

  13. Prompt neutrino results from a proton beam dump experiment

    Energy Technology Data Exchange (ETDEWEB)

    Berge, P.; Dydak, F.; Guyot, C.; Hagelberg, R.; Merlo, J.P.; Ranjard, F.; Rothberg, J.; Steinberger, J.; Taureg, H.; Rueden, W. von; Wahl, H.; Williams, R.W.; Wotschack, J. (European Organization for Nuclear Research, Geneva (Switzerland)); Bluemer, H.; Buchholz, P.; Duda, J.; Eisele, F.; Kleinknecht, K.; Knobloch, J.; Pollmann, D.; Pszola, B.; Renk, B. (Dortmund Univ. (Germany). Inst. fuer Physik); Belusevic, R.; Falkenburg, B.; Flottmann, T.; Groot, J.G.H. de; Geweniger, C.; Hepp, V.; Keilwerth, H.; Tittel, K. (Heidelberg Univ. (Germany). Inst. fuer Hochenergiephysik); Debu, P.; Para, A.; Perez, P.; Peyaud, B.; Rander, J.; Schuller, J.P.; Turlay, R. (CEA Centre d' Etudes Nucleaires de Saclay, 91 - Gif-sur-Yvette (France)); Abramowicz, H.; Krolikowski, J. (Warsaw Univ. (Poland). Inst. Fizyki Doswiadczalnej)

    1992-10-01

    A study of prompt neutrino events from 400 GeV protons on a beam-dump is presented. The ratio of electron- to muon-neutrino rates in 0.86{+-}0.14, in agreement with e-{mu} universality. The anti-neutrino to neutrino flux ratio is anti {nu}{sub {mu}}/{nu}{sub {mu}}=0.81{+-}0.19. The absolute rates and distributions observed are shown to be in quantitative agreement with the known properties of charmed-quark production in hadron collisions. (orig.).

  14. Conceptual Design of the LHC Beam Dumping Protection Elements TCDS and TCDQ

    CERN Document Server

    Goddard, B; Sans-Merce, M; Weterings, W

    2004-01-01

    The Beam Dumping System for the Large Hadron Collider, presently under construction at CERN, consists, per ring, of a set of horizontally deflecting extraction kicker magnets, vertically deflecting steel septa, dilution kickers and finally, a couple of hundred metres further downstream, an absorber block. A fixed diluter (TCDS) will protect the septa in the event of a beam dump that is not synchronised with the particle free gap or a spontaneous firing of the extraction kickers which will cause the beam to sweep over the septum. Another, mobile, diluter block (TCDQ) will protect the superconducting quadrupole immediate downstream of the extraction as well as the arc at injection energy and the triplet aperture at top energy from bunches with small impact parameters. This paper describes the conceptual design of the protection elements.

  15. New limits on hidden photons from past electron beam dumps

    International Nuclear Information System (INIS)

    Andreas, Sarah; Niebuhr, Carsten; Ringwald, Andreas

    2012-09-01

    Hidden sectors with light extra U(1) gauge bosons, so called hidden photons, have recently attracted some attention because they are a common feature of physics beyond the Standard Model like string theory and SUSY and additionally are phenomenologically of great interest regarding recent astrophysical observations. The hidden photon is already constrained by various laboratory experiments and presently searched for in running as well as upcoming experiments. We summarize the current status of limits on hidden photons from past electron beam dump experiments including two new limits from such experiments at KEK and Orsay that have so far not been considered. All our limits take into account the experimental acceptances obtained from Monte Carlo simulations.

  16. New limits on hidden photons from past electron beam dumps

    Energy Technology Data Exchange (ETDEWEB)

    Andreas, Sarah; Niebuhr, Carsten; Ringwald, Andreas

    2012-09-15

    Hidden sectors with light extra U(1) gauge bosons, so called hidden photons, have recently attracted some attention because they are a common feature of physics beyond the Standard Model like string theory and SUSY and additionally are phenomenologically of great interest regarding recent astrophysical observations. The hidden photon is already constrained by various laboratory experiments and presently searched for in running as well as upcoming experiments. We summarize the current status of limits on hidden photons from past electron beam dump experiments including two new limits from such experiments at KEK and Orsay that have so far not been considered. All our limits take into account the experimental acceptances obtained from Monte Carlo simulations.

  17. Design of Air-Cooled Beam Dump for Extraction Line of PS Booster

    CERN Document Server

    Perillo-Marcone, A; Venturi, V; Antonakakis, T; Vlachoudis, V; Nowak, E; Mason, G; Battistin, M; Czapski, M; Sgobba, S

    2013-01-01

    A new beam dump has been designed, which withstands the future proton beam extracted from the Proton Syncrotron Booster (PSB) at CERN, consisting of up to 1E14 protons per pulse at 2 GeV after its upgrade in 2018/2019. In order to be able to efficiently release the deposited heat, the new dump will be made out of a single cylindrical block of a copper alloy and cooled by forced ventilation. In order to determine the energy density distribution deposited by the beam in the dump, Monte Carlo simulations were performed using FLUKA, and thermomechanical analyses carried out by importing the energy density into Ansys. In addition, CFD simulations of the airflow were carried out in order to accurately estimate the heat transfer convection coefficient on the surface of the dump. This paper describes the design process and highlights the constraints of integrating a new dump for increased beam power into the existing facility.

  18. Analysis of RHIC beam dump pre-fires

    International Nuclear Information System (INIS)

    Zhang, W.; Ahrens, L.; Fischer, W.; Hahn, H.; Mi, J.; Sandberg, J.; Tan, Y.

    2011-01-01

    It has been speculated that the beam may cause instability of the RHIC Beam Abort Kickers. In this study, we explore the available data of past beam operations, the device history of key modulator components, and the radiation patterns to examine the correlations. The RHIC beam abort kicker system was designed and built in the 90's. Over last decade, we have made many improvements to bring the RHIC beam abort kicker system to a stable operational state. However, the challenge continues. We present the analysis of the pre-fire, an unrequested discharge of kicker, issues which relates to the RHIC machine safety and operational stability.

  19. Development of the heat sink structure of a beam dump for the proton accelerator

    International Nuclear Information System (INIS)

    Maeng, W. Y.; Gil, C. S.; Kim, J. H.; Kim, D. H.

    2007-01-01

    The beam dump is the essential component for the good beam quality and the reliable performance of the proton accelerator. The beam dump for a 20 MeV and 20 mA proton accelerator was designed and manufactured in this study. The high heats deposited, and the large amount of radioactivity produced in beam dump should be reduced by the proper heat sink structure. The heat source by the proton beam of 20 MeV and 20 mA was calculated. The radioactivity assessments of the beam dump were carried out for the economic shielding design with safety. The radioactivity by the protons and secondary neutrons in designed beam dump were calculated in this sturdy. The effective engineering design for the beam dump cooling was performed, considering the mitigation methods of the deposited heats with small angle, the power densities with the stopping ranges in the materials and the heat distributions in the beam dump. The heat sink structure of the beam dump was designed to meet the accelerator characteristics by placing two plates of 30 cm by 60 cm at an angle of 12 degree. The highest temperatures of the graphite, copper, and copper faced by cooling water were designed to be 223 degree, 146 degree, and 85 degree, respectively when the velocity of cooling water was 3 m/s. The heat sink structure was manufactured by the brazing graphite tiles to a copper plate with the filler alloy of Ti-Cu-Ag. The brazing procedure was developed. The tensile stress of the graphite was less than 75% of a maximum tensile stress during the accelerator operation based on the analysis. The safety analyses for the commissioning of the accelerator operation were also performed. The specimens from the brazed parts of beam dump structure were made to identify manufacturing problems. The soundness of the heat sink structure of the beam dump was confirmed by the fatigue tests of the brazed specimens of the graphite-copper tile components with the repetitive heating and cooling. The heat sink structure developed

  20. Simulation of the Beam Dump for a High Intensity Electron Gun

    CERN Document Server

    Doebert, S; Lefevre, T; Pepitone, K

    2014-01-01

    The CLIC Drive Beam is a high-intensity pulsed electron beam. A test facility for the Drive Beam electron gun will soon be commissioned at CERN. In this contribution we outline the design of a beam dump / Faraday cup capable of resisting the beam’s thermal load. The test facility will operate initially up to 140 keV. At such low energies, the electrons are absorbed very close to the surface of the dump, leading to a large energy deposition density in this thin layer. In order not to damage the dump, the beam must be spread over a large surface. For this reason, a small-angled cone has been chosen. Simulations using Geant4 have been performed to estimate the distribution of energy deposition in the dump. The heat transport both within the electron pulse and between pulses has been modelled using finite element methods to check the resistance of the dump at high repetition rates. In addition, the possibility of using a moveable dump to measure the beam profile and emittance is discussed.

  1. A new dump system design for stray light reduction of Thomson scattering diagnostic system on EAST

    Energy Technology Data Exchange (ETDEWEB)

    Xiao, Shumei; Zang, Qing, E-mail: zangq@ipp.ac.cn; Han, Xiaofeng; Wang, Tengfei; Zhao, Junyu [Institute of Plasma Physics, Chinese Academy of Sciences, P.O. Box 1126, Hefei, Anhui 230031 (China); Yu, Jin [Academy of Opto-Electronics, Chinese Academy of Sciences, Beijing 100094 (China)

    2016-07-15

    Thomson scattering (TS) diagnostic is an important diagnostic for measuring electron temperature and density during plasma discharge. However, the measurement of Thomson scattering signal is disturbed by the stray light easily. The stray light sources in the Experimental Advanced Superconducting Tokamak (EAST) TS diagnostic system were analyzed by a simulation model of the diagnostic system, and simulation results show that the dump system is the primary stray light source. Based on the optics theory and the simulation analysis, a novel dump system including an improved beam trap was proposed and installed. The measurement results indicate that the new dump system can reduce more than 60% of the stray light for the diagnostic system, and the influence of stray light on the error of measured density decreases.

  2. Beam systems without failures - What can be done?

    International Nuclear Information System (INIS)

    Solfaroli Camillocci, M.; Uythoven, J.

    2012-01-01

    The beam dumps at 3.5 TeV triggered by interlocks not related to the magnet powering are discussed. This concerns the systems like the RF, the transverse feedbacks, beam instrumentation, beam dumping system, collimators and control systems. An analysis of the reasons of these dumps is presented together with a possible strategy to mitigate the effect of these failures. It is very important to notice that no system has been identified to have any structural problem

  3. Beam Dumps and Beam Stoppers for LHC and CNGS Transfer Lines

    CERN Document Server

    Péraire, S

    2001-01-01

    Three new beam transfer lines are presently under construction at the SPS: TI2 and TI8 which will transfer protons and ions to the LHC, and TT41 which will transfer protons to the CNGS neutrino target. Three beam dumps (TED) and two beam stoppers (TBSE) will be installed in TI2 and TI8, and one TBSE in TT41. Both types of equipment are required to intercept the 450 GeV SPS beams concentrated in very short pulses (7.8 µs-10.5 µs) at intensities up to ~ 5 10**13 protons, every 16.8 seconds for the TED and as single shot for the TBSE. The outer TED iron shielding will be identical to the existing SPS one, while dimensions and material composition of both TED and TBSE cores have been optimised to cope with the new beam conditions. The optimised TED inner core consists of a Ø80 mm graphite cylinder 2.9 m long, housed into a Ø80/160 mm aluminium blind tube 3.5 m long, itself fitted into a Ø160/310 mm copper blind tube 4.3 m long. The TBSE is made of the same graphite cylinder, housed into a Ø80/120 mm alumin...

  4. KTeV beam systems design report

    Energy Technology Data Exchange (ETDEWEB)

    Bocean, V.; Childress, S.; Coleman, R. [and others

    1997-09-01

    The primary and secondary beams for the KTeV experiments E799-II and E832 are discussed. The specifications are presented and justified. The technical details of the implementation of the primary beam transport and stability are detailed. The target, beam dump, and radiation safety issues are discussed. The details of the collimation system for the pair of secondary beams are presented.

  5. Fluka Studies of the Asynchronous Beam Dump Effects on LHC Point 6 for a 7 TeV beam

    CERN Document Server

    VERSACI, R; GODDARD, B; MEREGHETTI, A; SCHMIDT, R; VLACHOUDIS, V

    2012-01-01

    The LHC is a record-breaking machine for beam energy and intensity. An intense effort has therefore been deployed in simulating critical operational scenarios of energy deposition. Using FLUKA Monte Carlo simulations, we have investigated the effects of an asynchronous beam dump at the LHC Point 6 where beams, with a stored energy of 360 MJ, can instantaneously release up to a few J cm^{-3} in the cryogenic magnets which have a quench limit of the order of the mJ cm^{-3}. In the present paper we will describe the simulation approach, and discuss the evaluated maximum energy release onto the superconducting magnets during an asynchronous beam dump of a 7 TeV beam. We will then analyze the shielding provided by collimators installed in the area and discuss safety limits for the operation of the LHC.

  6. Activation of the IFMIF prototype accelerator and beam dump by deuterons and protons

    Czech Academy of Sciences Publication Activity Database

    Simakov, S. P.; Bém, Pavel; Burjan, Václav; Fischer, U.; Forrest, R.A.; Götz, Miloslav; Honusek, Milan; Klein, H.; Kroha, Václav; Novák, Jan; Sauer, A.; Šimečková, Eva; Tiede, R.

    2008-01-01

    Roč. 83, 10-12 (2008), s. 1543-1547 ISSN 0920-3796 R&D Projects: GA MPO 2A-1TP1/101 Institutional research plan: CEZ:AV0Z10480505 Keywords : IFMIF * Protons and deuterons accelerator * Beam dump Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders Impact factor: 0.828, year: 2008

  7. Design for a 1.3 MW, 13 MeV Beam Dump for an Energy Recovery Linac

    CERN Document Server

    Sinclair, Charles K; Smith, Colin H

    2005-01-01

    The electron beam exiting an Energy Recovery Linac (ERL) is dumped close to the injection energy. This energy is chosen as low as possible while allowing the beam quality specifications to be met. As ERLs are designed for high average beam current, beam dumps are required to handle high beam power at low energy. Low energy electrons have a short range in practical dump materials, requiring the beam size at the dump face be enlarged to give acceptable power densities and heat fluxes. Cornell University is developing a 100 mA average current ERL as a synchrotron radiation source. The 13 MeV optimum injection energy requires a 1.3 MW beam dump. We present a mature design for this dump, using an array of water-cooled extruded copper tubes. This array is mounted in the accelerator vacuum normal to the beam. Fatigue failure resulting from abrupt thermal cycles associated with beam trips is a potential failure mechanism. We report on designs for a 75 kW, 750 keV tube-cooled beryllium plate dump for electron gun test...

  8. Fluka studies of the Asynchronous Beam Dump Effects on LHC Point 6

    CERN Document Server

    Versaci, R; Goddard, B; Mereghetti, A; Schmidt, R; Vlachoudis, V; CERN. Geneva. ATS Department

    2011-01-01

    The LHC is a record-breaking machine for beam energy and intensity. An intense effort has therefore been deployed in simulating critical operational scenarios of energy deposition. Using FLUKA Monte Carlo simulations, we have investigated the effects of an asynchronous beam dump at the LHC Point 6 where beams, with a stored energy of 360 MJ, can instantaneously release up to a few J cm^-3 in the cryogenic magnets which have a quench limit of the order of the mJ cm^-3. In the present paper we will describe the simulation approach, and discuss the evaluated maximum energy release onto the superconducting magnets during an asynchronous beam dump. We will then analyze the shielding provided by collimators installed in the area and discuss safety limits for the operation of the LHC.

  9. Burnout experiment in subcooled forced-convection boiling of water for beam dumps of a high power neutral beam injector

    International Nuclear Information System (INIS)

    Horiike, Hiroshi; Kuriyama, Masaaki; Morita, Hiroaki

    1982-01-01

    Experimental studies were made on burnout heat flux in highly subcooled forced-convection boiling of water for the design of beam dumps of a high power neutral beam injector for Japan Atomic Energy Research Institute Tokamak-60. These dumps are composed of many circular tubes with two longitudinal fins. The tube was irradiated with nonuniformly distributed hydrogen ion beams of 120 to 200 kW for as long as 10 s. The coolant water was circulated at flow velocities of 3 to 7.5 m/s at exit pressures of 0.4 to 0.9 MPa. The burnout and film-boiling data were obtained at local heat fluxes of 8 to 15 MW/m 2 . These values were as high as 2.5 times larger than those for the circumferentially uniform heat flux case with the same parameters. These data showed insensitivity to local subcooling as well as to pressure, and simple burnout correlations were derived. From these results, the beam dumps have been designed to receive energetic beam fluxes of as high as 5 MW/m 2 with a margin of a factor of 2 for burnout

  10. Dark Matter Search in a Proton Beam Dump with MiniBooNE.

    Science.gov (United States)

    Aguilar-Arevalo, A A; Backfish, M; Bashyal, A; Batell, B; Brown, B C; Carr, R; Chatterjee, A; Cooper, R L; deNiverville, P; Dharmapalan, R; Djurcic, Z; Ford, R; Garcia, F G; Garvey, G T; Grange, J; Green, J A; Huelsnitz, W; de Icaza Astiz, I L; Karagiorgi, G; Katori, T; Ketchum, W; Kobilarcik, T; Liu, Q; Louis, W C; Marsh, W; Moore, C D; Mills, G B; Mirabal, J; Nienaber, P; Pavlovic, Z; Perevalov, D; Ray, H; Roe, B P; Shaevitz, M H; Shahsavarani, S; Stancu, I; Tayloe, R; Taylor, C; Thornton, R T; Van de Water, R; Wester, W; White, D H; Yu, J

    2017-06-02

    The MiniBooNE-DM Collaboration searched for vector-boson mediated production of dark matter using the Fermilab 8-GeV Booster proton beam in a dedicated run with 1.86×10^{20} protons delivered to a steel beam dump. The MiniBooNE detector, 490 m downstream, is sensitive to dark matter via elastic scattering with nucleons in the detector mineral oil. Analysis methods developed for previous MiniBooNE scattering results were employed, and several constraining data sets were simultaneously analyzed to minimize systematic errors from neutrino flux and interaction rates. No excess of events over background was observed, leading to a 90% confidence limit on the dark matter cross section parameter, Y=ε^{2}α_{D}(m_{χ}/m_{V})^{4}≲10^{-8}, for α_{D}=0.5 and for dark matter masses of 0.01dark matter. This is the best limit from a dedicated proton beam dump search in this mass and coupling range and extends below the mass range of direct dark matter searches. These results demonstrate a novel and powerful approach to dark matter searches with beam dump experiments.

  11. Radiation Protection Study for the Shielding Design of the LINAC4 Beam Dump at CERN

    CERN Document Server

    Blaha, Jan

    2013-01-01

    The aim of this study is to determine an optimal shielding of the LINAC4 beam dump fulfilling the radiation protection requirements. Therefore a detailed Monte-Carlo calculation using FLUKA particle transport and interaction code has been performed and the relevant physics quantities, such as particle fluences, neutron energy spectra, residual and prompt dose rates, air and water activation have been evaluated for different LINAC4 operation phases.

  12. Dark Matter Search in a Beam-Dump eXperiment (BDX) at Jefferson Lab

    International Nuclear Information System (INIS)

    Battaglieri, M.

    2016-01-01

    MeV-GeV dark matter (DM) is theoretically well motivated but remarkably unexplored. This proposal presents the MeV-GeV DM discovery potential for a ∼ 1 m$^3$ segmented CsI(Tl) scintillator detector placed downstream of the Hall A beam-dump at Jefferson Lab, receiving up to 10 22 electrons-on-target (EOT) in 285 days. This experiment (Beam-Dump eXperiment or BDX) would be sensitive to elastic DM-electron and to inelastic DM scattering at the level of 10 counts per year, reaching the limit of the neutrino irreducible background. The distinct signature of a DM interaction will be an electromagnetic shower of few hundreds of MeV, together with a reduced activity in the surrounding active veto counters. A detailed description of the DM particle χ production in the dump and subsequent interaction in the detector has been performed by means of Monte Carlo simulations. Different approaches have been used to evaluate the expected backgrounds: the cosmogenic background has been extrapolated from the results obtained with a prototype detector running at INFN-LNS (Italy), while the beam-related background has been evaluated by GEANT4 Monte Carlo simulations. The proposed experiment will be sensitive to large regions of DM parameter space, exceeding the discovery potential of existing and planned experiments in the MeV-GeV DM mass range by up to two orders of magnitude.

  13. Dark Matter Search in a Beam-Dump eXperiment (BDX) at Jefferson Lab

    Energy Technology Data Exchange (ETDEWEB)

    Battaglieri, M. [Univ. of Genova (Italy). National Institute for Nuclear Physics. et al

    2016-07-05

    MeV-GeV dark matter (DM) is theoretically well motivated but remarkably unexplored. This proposal presents the MeV-GeV DM discovery potential for a $\\sim$1 m$^3$ segmented CsI(Tl) scintillator detector placed downstream of the Hall A beam-dump at Jefferson Lab, receiving up to 10$^{22}$ electrons-on-target (EOT) in 285 days. This experiment (Beam-Dump eXperiment or BDX) would be sensitive to elastic DM-electron and to inelastic DM scattering at the level of 10 counts per year, reaching the limit of the neutrino irreducible background. The distinct signature of a DM interaction will be an electromagnetic shower of few hundreds of MeV, together with a reduced activity in the surrounding active veto counters. A detailed description of the DM particle $\\chi$ production in the dump and subsequent interaction in the detector has been performed by means of Monte Carlo simulations. Different approaches have been used to evaluate the expected backgrounds: the cosmogenic background has been extrapolated from the results obtained with a prototype detector running at INFN-LNS (Italy), while the beam-related background has been evaluated by GEANT4 Monte Carlo simulations. The proposed experiment will be sensitive to large regions of DM parameter space, exceeding the discovery potential of existing and planned experiments in the MeV-GeV DM mass range by up to two orders of magnitude.

  14. THE RHIC BEAM ABORT KICKER SYSTEM

    International Nuclear Information System (INIS)

    Hahn, H.

    1999-01-01

    THE ENERGY STORED IN THE RHIC BEAM IS ABOUT 200 KJ PER RING AT DESIGN ENERGY AND INTENSITY. TO PREVENT QUENCHING OF THE SUPERCONDUCTING MAGNETS OR MATERIAL DAMAGE, THE BEAM WILL BE SAFELY DISPOSED OF BY AN INTERNAL BEAM ABORT SYSTEM, WHICH INCLUDES THE KICKER MAGNETS, THE PULSED POWER SUPPLIES, AND THE DUMP ABSORBER. DISPOSAL OF HEAVY IONS, SUCH AS GOLD, IMPOSES DESIGN CONSTRAINTS MORE SEVERE THAN THOSE FOR PROTON BEAMS OF EQUAL INTENSITY. IN ORDER TO MINIMIZE THE THERMAL SHOCK IN THE CARBON-FIBER DUMP BLOCK, THE BUNCHES MUST BE LATERALLY DISPERSED

  15. FLUKA Studies of the Asynchronous Beam Dump Effects on LHC Point 6

    CERN Document Server

    Versaci, R; Goddard, B; Schmidt, R; Vlachoudis, V; Mereghetti, A

    2011-01-01

    The LHC is a record-breaking machine for beam energy and intensity. An intense effort has therefore been deployed in simulating critical operational scenarios of energy deposition. FLUKA is the most widely used code for this kind of simulations at CERN because of the high reliability of its results and the ease to custom detailed simulations all along hundreds of meters of beam line. We have investigated the effects of an asynchronous beam dump on the LHC Point 6 where, beams with a stored energy of 360 MJ, can instantaneously release up to a few J cm−3 in the cryogenic magnets which have a quench limit of the order of the mJ cm−3. In the present paper we will describe the simulation approach, and discuss the evaluated maximum energy release onto the superconducting magnets during an asynchronous beam dump. We will then analyse the shielding provided by collimators installed in the area and discuss safety limits for the operation of the LHC.

  16. Design of a Compact Dump Resistor System for LCD Magnet

    CERN Document Server

    Gaddi, A

    2010-01-01

    In this technical note we suggest a possible solution for the choice of the detector magnet dump resistor. The push-pull scenario for Linear Collider Detectors imposes new solutions for magnet powering and protection lines, else than what developed for LHC detectors. The magnet dump resistor is the protecting equipment that has the function of extracting a significant amount of magnetic stored energy, from the coil winding to a dump. The LCD magnet has to move with the experiment from the garage to the beam position, so it has to be compact and reliable at the same time. We make here a proposal for a passive water-cooled dumper, we calculate the minimum amount of water required, the resistor hot-spot temperature, the overall mechanical design. The electrical part is not covered by this note, as it can be assumed that the solutions adopted by LHC detector magnets, in terms of quench instrumentation, energy extraction and maximum voltage, are not significantly affected by the push-pull scenario.

  17. LHC Beam Dump Design Study - Part III : Off-normal operating conditions

    CERN Document Server

    Bruno, L; Ross, M; Sala, P

    2000-01-01

    The LHC beam dump design study has been preliminarily substantiated by energy deposition simulations (Part I) and heat transfer analyses (Part II). The present report is devoted to the abnormal operating conditions induced by a malfunction of the beam diluters. A general approach to the analysis of off-normal operation is presented, which is derived from standard design norms adopted in the nuclear industry. Attention is focused mainly on the carbon core, which is longitudinally split into segments of different density in order to better distribute the deposited energy. The maximum energy density it absorbs decreases by at least 33%, compared to a uniform standard density carbon core. This structure may sustain any partial sweep failure without major damage, up to the ultimate beam intensity and energy. To minimise the risks inherent in a fully unswept beam, a sacrificial graphite mandrel will be placed on the core axis, surrounded by a thick high strength carbon-carbon composite tube. With this arrangement, ...

  18. LHC Asynchronous Beam Dump: Study of new TCDQ model and effects on downstream magnets

    CERN Document Server

    Versaci, R; Vlachoudis, V

    2012-01-01

    An asynchronous beam dump is one of the most critical accidents the LHC could face. In the effort to have a better protection of the machine, and to increase the robustness of the protection device itself, new models for the TCDQ (Target Collimator Dump Quadrupole) have been proposed and are under evaluation. Within this frame we have performed FLUKA evaluation of the energy deposition on one of the proposed models and on the downstream quadrupoles, MQY.4R6 and MQY.5R6, in order to evaluate the protection provided by the proposed model. The results of our study are compared to a similar one for a different proposed model and are input for the evaluation of the heat load on the proposed collimator.

  19. Design of the calorimeter and beam dump for the TFTR prototype neutral beam injector

    International Nuclear Information System (INIS)

    Stone, R.R.; Haughian, J.M.

    1977-01-01

    A calorimeter has been designed for use with the TFTR prototype neutral beam injection system. It consists of three vees each having two 18.8-mm-thick (0.75 in.) copper plates at a 6-deg angle, relative to the beam centerline. The maximum power density on a plate with this arrangement will be 2.0 kW/cm 2 , resulting in a front surface temperature rise of about 420 0 C. A support and retraction system moves the calorimeter in and out of the beam centerline. Various factors used in the selection of the absorber plate material will be discussed and also some experimental test results will be presented

  20. Design and fabrication of a 250 KW beam dump for LEHIPA

    International Nuclear Information System (INIS)

    Sawant, Y.; Agarwal, A.; Krishnagopal, S.; Singh, P.; Verma, Vishnu; Singh, R.K.; Kumawat, H.; Prasad, N.K.

    2013-01-01

    A 250 kW proton beam dump has been designed and developed for the Low Energy High Intensity Proton Accelerator (LEHIPA) project at BARC. This paper presents details of the design parameters, thermal analysis, and fabrication procedure and test results. Calculations of the heat flux distribution have been carried with the ICMC-1.0 code. The temperature distribution in the target and fluid, and heat flux at the solid-fluid interface has been evaluated using computational fluid dynamics code CFD ACE+. Effect of flow velocity on the temperature distribution has also been studied. The beam dump is in two sections: a conical inner section made of copper, on which the beam falls and deposits its energy, and an outer section that is the water cooling jacket. The copper parts were joined together by brazing. The outer cooling jacket has been designed and fabricated keeping in mind the cooling requirement of the inner target cone. The inner section has been vacuum checked to a vacuum level of 10 -6 Torr, and the outer section has been pressure tested to 6 bar. (author)

  1. Bounds on supersymmetric particles from a proton beam-dump experiment

    International Nuclear Information System (INIS)

    Bergsma, F.; Dorenbosch, J.; Jonker, M.; Nieuwenhuis, C.; Allaby, J.V.; Amaldi, U.; Barbiellini, G.; Barone, L.; Capone, A.; Flegel, W.; Metcalf, M.; Panman, J.; Winter, K.; Aspiazu, J.; Buesser, F.W.; Daumann, H.; Gall, P.D.; Metz, E.; Niebergall, F.; Ranitzsch, K.H.; Staehelin, P.

    1983-01-01

    We estimate the magnitude of effects induced by gluino hadroproduction and subsequent gluino decay into a photino and hadrons in a proton beam-dump experiment. By comparing our estimates with results obtained by us in an experiment performed at the CERN SPS we set a lower bound on the gluino mass which is a function of the scalar quark mass. The results do not favour the existence of low mass gluinos (< 2 GeV) and scalar quarks (< 100 GeV). (orig.)

  2. Hidden photons in beam dump experiments and in connection with dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Andreas, Sarah

    2012-12-15

    Hidden sectors with light extra U(1) gauge bosons, so-called hidden photons, recently received much interest as natural feature of beyond standard model scenarios like string theory and SUSY and because of their possible connection to dark matter. This paper presents limits on hidden photons from past electron beam dump experiments including two new limits from experiments at KEK and Orsay. Additionally, various hidden sector models containing both a hidden photon and a dark matter candidate are discussed with respect to their viability and potential signatures in direct detection.

  3. Radiation damage in silicon due to albedo neutrons emitted from hadronic beam dumps (Fe and U)

    International Nuclear Information System (INIS)

    Gabriel, T.A.; Bishop, B.L.

    1987-01-01

    Calculations have been carried out to determine the level of radiation damage that can be expected from albedo neutrons when 1- and 5-GeV negative pions are incident on iron and uranium beam dumps. The calculated damage data are presented in several ways including neutron fluence above 0.111 MeV, 1 MeV equivalent neutron fluence, damage energy deposition, and DPA or displacements per atom. Details are presented as to the method of calculation. 14 refs., 1 fig., 1 tab

  4. Optimization of Front Axle Suspension System of Articulated Dump Truck

    DEFF Research Database (Denmark)

    Langer, Thomas Heegaard; Christensen, Brian B.; Mouritsen, Ole Ø.

    2010-01-01

    Manufacturers of construction machinery are challenged to accommodate legal requirements on the vibration exposure associated with their products. For such machines a crucial performance parameter is the whole body vibration level that the operator is subjected to. This paper presents results from...... that has been subjected to comfort improvement is a two axle articulated dump truck. The comfort has been in terms of whole body vibration exposure and the overall improvement has been made possible by adding front axle suspension. However, a hydraulic stabilizing system between the tractor and trailer...... to evaluate the whole body vibrations. By use of a multibody simulation model of the dump truck the whole body vibration exposure has been computed using the predefined work cycle as model input. The design parameters comprise the components of the hydraulic subsystem of the suspension, i.e., the size...

  5. SHiP: a new multipurpose beam-dump experiment at the SPS

    Directory of Open Access Journals (Sweden)

    Dijkstra H.B.

    2016-01-01

    to be constructed beam-dump facility at the CERN SPS. The SHiP Technical Proposal has been submitted to the CERN SPS Committee in April 2015. The 400 GeV/c proton beam extracted from the SPS will be dumped on a heavy target with the aim of integrating 2 × 1020 proton on target in five years. A detector located downstream of the target, based on a long vacuum tank followed by a spectrometer and particle identification detectors, will allow probing a variety of models with light long-lived exotic particles and masses below a few GeV/c2. The main focus will be the physics of the so-called Hidden Portals, i.e. search for Dark Photons, Light scalars and pseudo-scalars, and Heavy Neutral Leptons (HNL. The sensitivity to HNL will allow for the first time to probe, in the mass range between the kaon and the charm meson mass, a coupling range for which Baryogenesis and active neutrino masses could also be explained. Integrated in SHiP is an Emulsion Cloud Chamber, already used in the OPERA experiment, which will allow to study active neutrino cross-sections and angular distributions. In particular SHiP can distinguish between vτ and v̄τ, and their deep inelastic scattering cross sections will be measured with statistics three orders of magnitude larger than currently available.

  6. New exclusion limits for dark gauge forces from proton Bremsstrahlung in beam-dump data

    Energy Technology Data Exchange (ETDEWEB)

    Bluemlein, Johannes [Deutsches Elektronen-Synchrotron (DESY), Zeuthen (Germany); Brunner, Juergen [Aix-Marseille Univ. CNRS/IN2P3 (France). CPPM

    2013-11-15

    We re-analyze published proton beam dump data taken at the U70 accelerator at IHEP Serpukhov with the {nu}-calorimeter I experiment in 1989 to set mass-coupling limits for dark gauge forces. The corresponding data have been used for axion and light Higgs particle searches before. More recently, limits on dark gauge forces have been derived from this data set, considering a dark photon production from {pi}{sup 0}-decay. Here we determine extended mass and coupling exclusion bounds for dark gauge bosons ranging to masses m{sub {gamma}'} of 624 MeV at admixture parameters {epsilon}{approx_equal}10{sup -6} considering high-energy Bremsstrahlung of the U-boson of the initial proton beam and different detection mechanisms.

  7. Results of a beam dump experiment at the CERN SPS neutrino facility

    Directory of Open Access Journals (Sweden)

    T. Hansl

    1978-03-01

    Full Text Available We report results from a beam dump experiment that has been performed at the CERN SPS neutrino facility using the CDHS neutrino counter detector. Limits on dimuon and trimuon production by new penetrating neutral particles are given. A new source of prompt electron and muon neutrinos has been observed giving (1.2±0.4× 10−7 νe or νμ per incident proton with neutrino angle smaller than 1.85 mrad and Eν > 20 GeV. If these prompt neutrinos are attributed to charmed meson pair production, the inclusive DD production cross section could be of the order of 30 ωb. If axions are existing their production rate relative to π0 mesons is found to be less than 0.5 × 10−8.

  8. Wheel slip dump valve for railway braking system

    Science.gov (United States)

    Zhang, Xuan; Zhang, LiHao; Li, QingXuan; Shi, YanTao

    2017-09-01

    As we all know, pneumatic braking system plays an important role in the safety of the whole vehicle. In the anti slip braking system, the pressure of braking cylinder can be adjusted by the quick power response of wheel slip dump valve, so that the lock situation won’t occur during vehicle service. During the braking of railway vehicles, the braking force provided by braking disc reduces vehicle’s speed. But the locking slip will happen due to the oversize of braking force or the reduction of sticking coefficient between wheel and rail. It will cause not only the decline of braking performance but also the increase of braking distance. In the meanwhile, it will scratch the wheel and influence the stable running of vehicles. Now, the speed of passenger vehicle has been increased. In order to shorten the braking distance as far as possible, sticking stickiness must be fully applied. So the occurrence probability of wheel slip is increased.

  9. SHiP: a new multipurpose beam-dump experiment at the SPS.

    CERN Document Server

    AUTHOR|(SzGeCERN)387671

    2016-01-01

    SHiP is an experiment to look for very weakly interacting particles at a new to be constructed beam-dum p facility at the CERN SPS. The SHiP Technical Proposal has been submitted to the CERN SPS Committee in April 2015. The 400 GeV/c proton beam extracted from the SPS will be dumped on a heavy target with the aim of integ rating $2\\times 10^{20}$ proton on target in five years. A detector located downstream of the target, based on a long vacuum tank followed by a spectrometer and particle identification detectors, will allow probing a variety of models with light long-lived exotic particles and masses below a few GeV/c$^2$. The main focus will be the physics of the so-called Hidden Portals, i.e. search for Dark Photons, Light scalars and pseudo-scalars, and Heavy Neutral Leptons (HNL). The sensitivity to HNL will allow for the first time to probe, in the mass range between the kaon and the charm meson mass, a coupling range for which Baryogenesis and active neutrino masses could also be explained...

  10. SEA participation in the design of local shielding the beam dump of IFMIF; Participacion de sea en el diseno del blindaje local del beam dumpo de IFMIF

    Energy Technology Data Exchange (ETDEWEB)

    Ortega, P.

    2012-07-01

    The beam dump is a very important source of radiation both during the operation and after the throttle stop, so it requires the availability of a local shielding to minimize dose in the neighboring rooms during operation as well as the dose to the teams maintenance during shutdown.

  11. Diffraction measurements using the LHC Beam Loss Monitoring System

    Science.gov (United States)

    Kalliokoski, Matti

    2017-03-01

    The Beam Loss Monitoring (BLM) system of the Large Hadron Collider protects the machine from beam induced damage by measuring the absorbed dose rates of beam losses, and by triggering beam dump if the rates increase above the allowed threshold limits. Although the detection time scales are optimized for multi-turn losses, information on fast losses can be recovered from the loss data. In this paper, methods in using the BLM system in diffraction studies are discussed.

  12. AIP Diffraction measurements using the LHC Beam Loss Monitoring System

    CERN Document Server

    Kalliokoski, Matti

    2017-01-01

    The Beam Loss Monitoring (BLM) system of the Large Hadron Collider protects the machine from beam induced damage by measuring the absorbed dose rates of beam losses, and by triggering beam dump if the rates increase above the allowed threshold limits. Although the detection time scales are optimized for multi-turn losses, information on fast losses can be recovered from the loss data. In this paper, methods in using the BLM system in di ff raction studies are discussed.

  13. Search for Light Dark Matter Produced in a Proton Beam Dump

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, Remington Tyler [Indiana Univ., Bloomington, IN (United States)

    2017-01-01

    Cosmological observations indicate that our universe contains dark matter (DM), yet we have no measurements of its microscopic properties. Whereas the gravitational interaction of DM is well understood, its interaction with the Standard Model is not. Direct detection experiments, the current standard, search for a nuclear recoil interaction and have a low-mass sensitivity edge of order 1 GeV. A path to detect DM with mass below 1 GeV is the use of accelerators producing boosted low-mass DM. Using neutrino detectors to search for low-mass DM is logical due to the similarity of the DM and neutrino signatures in the detector. The MiniBooNE experiment, located at Fermilab on the Booster Neutrino Beamline, has produced the first proton beam-dump light DM search results. Using dark matter scattering from nucleons 90% confidence limits were set over a large parameter space and, to allow tests of other theories, a model independent DM rate was extracted.

  14. Measurements of Linac4 H$^{-}$ ion source beam with a magnetized Einzel lens electron dump

    CERN Document Server

    Midttun, O; Scrivens, R

    2014-01-01

    Linac4 is a part of the upgrade of CERN’s accelerator complex for increased luminosity in the LHC. A new system to extract the ion beam from the plasma generator has been designed and tested, in order to improve the reliability and beam optics of the pulsed H- ion source. This paper presents the successfully implemented extraction system and three different beam measurements. The simulations compare well to the measurements and show that the plasma density was too low for the extraction system design during the measurements.

  15. Accelerator physics studies on the effects from an asynchronous beam dump onto the LHC experimental region collimators

    CERN Document Server

    Lari, L; Boccone, V; Bruce, R; Cerutti, F; Rossi, A; Vlachoudis, V; Mereghetti, A; Faus-Golfe, A

    2012-01-01

    Asynchronous beam aborts at the LHC are estimated to occur on average once per year. Accelerator physics studies of asynchronous dumps have been performed at different beam energies and beta-stars. The loss patterns are analyzed in order to identify the losses in particular on the Phase 1 Tertiary Collimators (TCT), since their tungsten-based active jaw insert has a lower damage threshold than the carbon-based other LHC collimators. Settings of the tilt angle of the TCTs are discussed with the aim of reducing the thermal loads on the TCT themselves.

  16. Mapping Of Construction Waste Illegal Dumping Using Geographical Information System (GIS)

    Science.gov (United States)

    Zainun, Noor Yasmin; Rahman, Ismail Abdul; Azwana Rothman, Rosfazreen

    2016-11-01

    Illegal dumping of solid waste not only affecting the environment but also social life of communities, hence authorities should have an effective system to cater this problem. Malaysia is experiencing extensive physical developments and this has led to an increase of construction waste illegal dumping. However, due to the lack of proper data collection, the actual figure for construction waste illegal dumping in Malaysia are not available. This paper presents a mapping of construction waste illegal dumping in Kluang district, Johor using Geographic Information System (GIS) software. Information of the dumped waste such as coordinate, photos, types of material and quantity of waste were gathered manually through site observation for three months period. For quantifying the dumped waste, two methods were used which are the first method is based on shape of the waste (pyramids or squares) while the second method is based weighing approach. All information regarding the waste was assigned to the GIS for the mapping process. Results indicated a total of 12 types of construction waste which are concrete, tiles, wood, gypsum board, mixed construction waste, brick and concrete, bricks, sand, iron, glass, pavement and tiles, and concrete at 64 points locations of illegal dumping on construction waste in Kluang. These wastes were accounted to an estimated volume of 427.2636 m3. Hopefully, this established map will assist Kluang authority to improve their solid waste management system in Kluang.

  17. Energy dump of the ATLAS superconducting system simulations of electrical and thermal behaviour of magnet system at slow- and fast dump

    CERN Document Server

    van Beek, Martijn; Dudarev, A

    During the slow dump (discharge) of the Barrel Toroidal (superconducting) magnet of the ATLAS detector, the control system gave an alarm that the differences between the voltages over the conductors were too high. The alarm was not due to any danger, because of some sort of phenomenon observed in the first few seconds after start of the discharge. A possible explanation of the differences of the coil voltages is that the changing current through the conductors may cause induced currents in the coil casing around. The goal was to make a simulation of the electrical behaviour of the magnet system during a slow dump. In this way, an explanation can be found for the start phenomenon of the slow dump of the Barrel Toroid. Some extra analyses on the measurements were performed to describe the energy dissipation during a fast dump. This is done by calculating the resistance of the coils during the dump. With the maximum resistance, the maximum temperature can be estimated, which says something about the enthalpy of ...

  18. Recuperation of ISR Dipole Magnet Yokes for Use as Shielding for the LHC Beam Dumps TDE

    CERN Document Server

    Ross, M

    1999-01-01

    The quantity of iron shielding required for two LHC dumps was estimated at about 1500 tons. Possible sources of slightly irradiated iron shielding were considered, in particular, the ISR dipole yokes, which were stocked in the I2. Of rectangular form and weighing 22 tons each, they were well suited to the LHC dump geometry. Furthermore, they were to all intents and purposes non-radioactive. The preferred solution was to cut off four lifting pads and three support plates using arc/air equipment, seal temporarily each end with shutters, fit two lifting "anchor" pins, and fill with concrete.

  19. Radiation damage and waste management options for the sombrero final focus system and neutron dumps

    Energy Technology Data Exchange (ETDEWEB)

    Reyes, S.; Latkowski, J.F.; Meier, W.R. [Lawrence Livermore National Lab., CA (United States); Reyes, S. [Escuela Tecnica Superior de Ingenieros Industriales, Universidad Nacional de Educacion a Distancia and Instituto de Fusion Nuclear, Dept. Ingenieria Energetica, Bilbao (Spain)

    2000-07-01

    Previous studies of the safety and environmental aspects of the SOMBRERO inertial fusion energy (IFE) power plant design did not completely address the issues associated with the final focus system. While past work calculated neutron fluences for a grazing incidence metal mirror (GIMM) and a final focus mirror, scattering off of the final optical component was not included, and thus, fluences in the final focus mirror were significantly underestimated. In addition, past work did not consider neutron-induced gamma-rays. Finally, power plant lifetime waste volumes may have been underestimated as neutron activation of the neutron dumps and building structure were not addressed. In the present work, a modified version of the SOMBRERO target building is presented where a significantly larger open solid-angle fraction (5%) is used to enhance beam smoothing of a diode-pumped solid-state laser (DPSSL). The GIMMs are replaced with transmissive fused silica wedges and have been included in three-dimensional neutron and photon transport calculations. This work shows that a power plant with a large open solid-angle fraction, needed for beam smoothing with a DPSSL, is acceptable from tritium breeding, and neutron activation points-of-view. (authors)

  20. Dumping convention

    International Nuclear Information System (INIS)

    Roche, P.

    1992-01-01

    Sea dumping of radioactive waste has, since 1983, been precluded under a moratorium established by the London Dumping Convention. Pressure from the nuclear industry to allow ocean dumping of nuclear waste is reported in this article. (author)

  1. Dark matter search in a Beam-Dump eXperiment (BDX) at Jefferson Lab: an update on PR12-16-001

    Energy Technology Data Exchange (ETDEWEB)

    Battaglieri, M.; et al.

    2017-12-07

    This document is an update to the proposal PR12-16-001 Dark matter search in a Beam-Dump eXperiment (BDX) at Jefferson Lab submitted to JLab-PAC44 in 2016 reporting progress in addressing questions raised regarding the beam-on backgrounds. The concerns are addressed by adopting a new simulation tool, FLUKA, and planning measurements of muon fluxes from the dump with its existing shielding around the dump. First, we have implemented the detailed BDX experimental geometry into a FLUKA simulation, in consultation with experts from the JLab Radiation Control Group. The FLUKA simulation has been compared directly to our GEANT4 simulations and shown to agree in regions of validity. The FLUKA interaction package, with a tuned set of biasing weights, is naturally able to generate reliable particle distributions with very small probabilities and therefore predict rates at the detector location beyond the planned shielding around the beam dump. Second, we have developed a plan to conduct measurements of the muon ux from the Hall-A dump in its current configuration to validate our simulations.

  2. Beam scanning system

    International Nuclear Information System (INIS)

    Enge, H.A.

    1977-01-01

    A system for deflecting a beam of particles having different momenta, preferably through a 90 0 angle, so as to cause the beam to impinge upon a moving target and to scan across the target is described. The system includes a means responsive to a beam from a suitable source for causing the beam to periodically scan in a scanning plane and further means for deflecting the periodically scanned beam through the desired angle in a deflection plane so that the deflected beam impinges on the target. Means are included in the system for reducing the momentum dispersion at the target in both the deflection and the scanning planes and for spatially focussing the beam so as to produce a desired beam diameter at the target

  3. Research on hydraulic system of KZC-5 type rear dump truck in underground mine

    International Nuclear Information System (INIS)

    Lei Zeyong

    2005-01-01

    KZC-5 type rear dump truck in underground mine is introduced in this paper. The determining principles and ways of two main hydraulic systems are discussed. It has been proved that the hydraulic systems are reasonable in the industrial scale test. (author)

  4. Evaluation of the Energy Deposition in the event of an Asynchronous Beam Dump for a 7 TeV beam on the new TCDQ model proposed for the LHC

    CERN Document Server

    Versaci, R; CERN. Geneva. ATS Department

    2012-01-01

    An asynchronous beam dump is one of the most critical accident the LHC could face. In the effort to have a better protection of the machine, a new model for the TCDQ (Target Collimator Dump Quadrupole) has been proposed and is under evaluation. Within this frame we have performed FLUKA evaluation of the energy deposition. The results of our simulations are also input for the evaluation of the heat load on the collimator.

  5. Upgrade of the TCDQ: A dumping protection system for the LHC

    CERN Document Server

    Antonakakis, T

    2012-01-01

    In the context of the LHC, an asynchronous beam dump could be destructive. In order to ensure the safety of the machine and its surroundings a model of the TCDQ dump has been designed. The length of the TCDQ dump is increased by 50% and its material distribution along its length is changed from graphite to a carbon composite that clearly withstands higher stresses then its counterpart. There are two different density composites used along the dump‘s length in a similar distribution than that of the TCDS, varying from high density to low then back to high. The power deposition within the duration of a pulse is given by FLUKA simulations and is used to predict temperature and stress distributions in space and time. The results are compared with previous studies in which graphite material was used. The difference in the thermal expansion coefficient of the two materials explains the reduced stresses in the newer design. Due to the high cost of carbon composites an alternative solution is thought without jeopar...

  6. TPX Neutral Beam Injection System design

    International Nuclear Information System (INIS)

    von Halle, A.; Bowen, O.N.; Edwards, J.W.

    1993-01-01

    The existing Tokamak Fusion Test Reactor Neutral Beam system is proposed to be modified for long pulse operation on the Tokamak Physics Experiment (TPX). Day one of TPX will call for one TFTR beamline modified for 1000 second pulse lengths oriented co-directional to the plasma current. The system design will be capable of accommodating an additional co-directional and a single counter directional beamline. For the TPX conceptual design, every attempt was made to use existing Neutral Beam hardware, plant facilities, auxiliary systems, service infrastructure, and control systems. This paper describes the moderate modifications required to the power systems, the ion sources, and the beam impinged surfaces of the ion dumps, the calorimeters, the various beam scrapers, and the neutralizers. Also described are the minimal modifications required to the vacuum, cryogenic, and gas systems and the major modification of replacing the beamline-torus duct in its entirety. Operational considerations for Neutral Beam subsystems over 1000 second pulse lengths will be explored including proposed operating scenarios for full steady state operation

  7. The CMS Beam Conditions and Radiation Monitoring System

    Science.gov (United States)

    Castro, E.; Bacchetta, N.; Bell, A. J.; Dabrowski, A.; Guthoff, M.; Hall-Wilton, R.; Hempel, M.; Henschel, H.; Lange, W.; Lohmann, W.; Müller, S.; Novgorodova, O.; Pfeiffer, D.; Ryjov, V.; Stickland, D.; Schimdt, R.; Walsh, R.

    The Compact Muon Solenoid (CMS) is one of the two large, general purpose experiments situated at the LHC at CERN. As with all high energy physics experiments, knowledge of the beam conditions and luminosity is of vital importance. The Beam Conditions and Radiation Monitoring System (BRM) is installed in CMS to protect the detector and to provide feedback to LHC on beam conditions. It is composed of several sub-systems that measure the radiation level close to or inside all sub-detectors, monitor the beam halo conditions with different time resolution, support beam tuning and protect CMS in case of adverse beam conditions by firing a beam abort signal. This paper presents three of the BRM subsystems: the Fast Beam Conditions Monitor (BCM1F), which is designed for fast flux monitoring, measuring with nanosecond time resolution, both the beam halo and collision products; the Beam Scintillator Counters (BSC), that provide hit rates and time information of beam halo and collision products; and the Beam Conditions Monitors (BCM) used as a protection system that can trigger a beam dump when beam losses occur in order to prevent damage to the pixel and tracker detectors. A description of the systems and a characterization on the basis of data collected during LHC operation is presented.

  8. Social dumping

    DEFF Research Database (Denmark)

    Pedersen, Klaus

    2010-01-01

    bidrag til, at OK-2010 "landes" fredeligt, fordi aftalen giver fagforeningerne en væsentlig indrømmelse i indsatsen mod social dumping. Aftalen har rigtignok til formål at imødekomme et af fagbevægelsens centrale overenskomstkrav om nye redskaber i indsatsen mod "social dumping". Men hvad er det aftalen...

  9. A Large Scintillating Screen for the LHC Dump Line

    CERN Document Server

    Lefèvre, T; Bravin, E; Burger, S; Goddard, B; Hutchins, S; Renaglia, T

    2008-01-01

    The 7 TeV proton beam from the LHC ring is ejected through a long transfer line to beam dump blocks, approximately 100m downstream of the ejection septa, a series of dilution kicker magnets provide a sweeping deflection spreading the extracted beam over a 40 cm diameter area on the face of the beam dump cores. During normal operation, the quality of each dump event must be recorded and verified. The so-called â€ワPost-Mortem” dataset will include information from the beam dumping system (logic signals, kicker pulses…) as well as from the beam diagnostics along the extraction lines. For this purpose, profile monitors in front of the dump blocks must be permanently available during machine operation. With more than 1014 protons stored in LHC, the energy deposited in the screen becomes an issue and thermalresistant materials have to be considered. In this paper, the design of this quite unusual device is presented. The different technical options considered for the choice of the screen material are ...

  10. Evaluation of a radar-based proximity warning system for off-highway dump trucks.

    Science.gov (United States)

    Ruff, Todd

    2006-01-01

    A radar-based proximity warning system was evaluated by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health to determine if the system would be effective in detecting objects in the blind spots of an off-highway dump truck. An average of five fatalities occur each year in surface mines as a result of an equipment operator not being aware of a smaller vehicle, person or change in terrain near the equipment. Sensor technology that can detect such obstacles and that also is designed for surface mining applications is rare. Researchers worked closely with the radar system manufacturer to test and modify the system on large, off-highway dump trucks at a surface mine over a period of 2 years. The final system was thoroughly evaluated by recording video images from a camera on the rear of the truck and by recording all alarms from the rear-mounted radar. Data show that the system reliably detected small vehicles, berms, people and other equipment. However, alarms from objects that posed no immediate danger were common, supporting the assertion that sensor-based systems for proximity warning should be used in combination with other devices, such as cameras, that would allow the operator to check the source of any alarm.

  11. Electron beam processing system

    International Nuclear Information System (INIS)

    Kashiwagi, Masayuki

    2004-01-01

    Electron beam Processing Systems (EPS) are used as useful and powerful tools in many industrial application fields such as the production of cross-linked wire, rubber tire, heat shrinkable film and tubing, curing, degradation of polymers, sterilization and environmental application. In this paper, the feature and application fields, the selection of machine ratings and safety measures of EPS will be described. (author)

  12. The beam transport system

    International Nuclear Information System (INIS)

    1986-01-01

    The first proton beams have been transported along the transfer beamline and the diagnostic components have thus been used and tested under real operating conditions. The various electronic systems have been linked to the control system and the equipment can now be operated from the control console. The performance of the diagnostic system for the transfer beamline is satisfactory. The beam diagnostic components for the high-energy beamlines up to the isotope production and neutron therapy vaults and the first experimental target rooms have been installed. The high-energy slits have been delivered. The scanner and harp electronics have been installed and linked to their respective components in the beamlines. The pneumatic acuator control electronics has been manufactured, installed and is operational; provision has been made for special control features of the equipment in the therapy beamline. The high-voltage bias supply for the Faraday cups has been implemented. The installation of the beam current measurement system is nearing completion although part of it is already operational. A coaxial relay multiplexer for the capacitive phase probe signals has been manufactured and installed. The diagnostic equipment for the beamlines to isotope production and neutron therapy is thus ready for operation. 4 figs

  13. Reclamation of landfills and dumps of municipal solid waste in a energy efficient waste management system: methodology and practice

    Science.gov (United States)

    Orlova, Tatyana; Melnichuk, Aleksandr; Klimenko, Kseniya; Vitvitskaya, Valentina; Popovych, Valentina; Dunaieva, Ielizaveta; Terleev, Vitaly; Nikonorov, Aleksandr; Togo, Issa; Volkova, Yulia; Mirschel, Wilfried; Garmanov, Vitaly

    2017-10-01

    The article considers the methodological and practical aspects of reclamation of landfills and dumps of municipal solid waste in a waste management system. The general tendencies of system development in the context of elements of the international concept of waste hierarchy are analyzed. Statistics of the formation and burial of domestic waste indicate a strategic non-alternative to the rejection of landfill technologies in favor of environmentally, energy efficient and economically expedient ways of utilization of municipal waste as a world trend. Practical approaches to the study of territories on which there are dumps and landfills are considered to justify the design solutions for reclamation.

  14. Slow beam raster system at CEBAF

    International Nuclear Information System (INIS)

    Yan, C.; Beaufait, J.; Carlini, R.; Cuevas, C.; Vulcan, W.; Wines, R.

    1994-01-01

    A bedstead air-core raster magnet is being installed now, it will be used at CEBAF to scan the beam on the Hall C polarized target and the beam dump with fixed frequency 60 Hz in horizontal, 103.4 Hz in vertical. The x and y raster magnets are driven by Variac transformer and SUMIT-OMO inverter respectively. Both of them provide an approximate sine current waveform with peak current 20 A, corresponding to a maximum deflection angle 1 mr

  15. High heat flux engineering for the upgraded neutral beam injection systems of MAST-U

    Energy Technology Data Exchange (ETDEWEB)

    Dhalla, F., E-mail: Fahim.dhalla@ccfe.ac.uk; Mistry, S.; Turner, I.; Barrett, T.R.; Day, I.; McAdams, R.

    2015-10-15

    Highlights: • A new Residual Ion Dump (RID) and bend magnet system for the upgraded NBI systems have been designed for the 5 s MAST-U pulse requirements. • Design scoping was performed using numerical ion-tracing analysis software (MAGNET and OPERA codes). • A more powerful bending magnet will separate the residual ions into full, half and third energy components. • Three separate CuCrZr dumps spread the power loading resulting in acceptable power footprints. • FE thermo-mechanical analyses using ANSYS to validate the designs against the ITER SDC-IC code. • New bend magnet coils, yoke and CuCrZr water-cooled plates are in the procurement phase. - Abstract: For the initial phase of MAST-U operation the two existing neutral beam injection systems will be used, but must be substantially upgraded to fulfil expected operational requirements. The major elements are the design, manufacture and installation of a bespoke bending magnet and Residual Ion Dump (RID) system. The MAST-design full energy dump is being replaced with new actively-cooled full, half and third energy dumps, designed to receive 2.4 MW of ion power deflected by an iron-cored electromagnet. The main design challenge is limited space available in the vacuum vessel, requiring ion-deflection calculations to ensure acceptable heat flux distribution on the dump panels. This paper presents engineering and physics analysis of the upgraded MAST beamlines and reports the current status of manufacture.

  16. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  17. Observation of an excess of νe, νe events in a beam dump experiment at 400 GeV

    Directory of Open Access Journals (Sweden)

    P. Alibran

    1978-03-01

    Full Text Available A beam dump experiment has been performed at CERN in Gargamelle using the neutrino facility to look for penetrating particles produced either directly in the beam interaction or by prompt decay of new particles. A total of 32 interactions with a visible energy greater than 10 GeV has been found, classified, aftercorrections, into 18 charged current νμ or νμ, 5.1 neutral current and 8.9 νe or νe charged current events. An excess of νe events remains after all subtractions from any established sources. Results are presented in terms of the product of the cross section and the leptonic decay branching ratio of the possible source.

  18. Fibre Monitoring System for the Beam Permit Loops at the LHC and Future Evolution of the Beam Interlock System

    CERN Document Server

    García-Argos, Carlos; Gabourin, Stéphane; Martin, Christophe; Puccio, Bruno; Siemko, Andrzej P.

    The optical fibres that transmit the beam permit loop signals at the CERN accelerator complex are deployed along radiation areas. This may result in increased attenuation of the fibres, which reduces the power margin of the links. In addition, other events may cause the links to not function properly and result in false dumps, reducing the availability of the accelerator chain and affecting physics data taking. In order to evaluate the state of the fibres, an out-of-band fibre monitoring system is proposed, working in parallel to the actual beam permit loops. The future beam interlock system to be deployed during LHC long shutdown 2 will implement online, real-time monitoring of the fibres, a feature the current system lacks. Commercial off-the-shelf components to implement the optical transceivers are proposed whenever possible instead of ad-hoc designs.

  19. DEVELOPMENT OF SYSTEMS FOR SUPPORT OF OPEN-CAST DUMP TRUCK DRIVERS’ FITNESS TO WORK

    Directory of Open Access Journals (Sweden)

    V. V. Savchenko

    2006-01-01

    Full Text Available The paper considers the ways directed on improvement of drivers’ work efficiency and peculiarities of the executed algorithms of their activity. Several possibilities for the usage of algorithms and hardware-software means with the purpose to control development of emotional excitation of open-cast dump truck drivers are discussed in the paper. Such approach is presented as one of the possible ways intended to increase an efficiency of open-cast dump trucks functioning. It is based on minimization of negative aspects of so called «human factors» during the execution of algorithm activity by a driver.

  20. Ocean Dumping Control Regulations

    International Nuclear Information System (INIS)

    1978-01-01

    These Regulations were made further to the Ocean Dumping Control Act which provides for restrictions in dumping operations. The Regulations contain model applications for permits to dump or load a series of materials. (NEA)

  1. Beam based systems and controls

    CERN Document Server

    Jacquet, D

    2012-01-01

    This presentation will give a review from the operations team of the performance and issues of the beam based systems, namely RF, ADT, beam instrumentation, controls and injection systems. For each of these systems, statistics on performance and availability will be presented with the main issues encountered in 2012. The possible improvements for operational efficiency and safety will be discussed, with an attempt to answer the question "Are we ready for the new challenges brought by the 25ns beam and increased energy after LSI? ".

  2. A magnetized Einzel lens electron dump for the Linac4 H− ion source

    CERN Document Server

    Midttun, O; Kronberger, M; Lettry, J; Pereira, H; Scrivens, R

    2013-01-01

    Linac4 is a 160 MeV linear accelerator which will inject negative hydrogen ions (H−) into CERN’s Proton Synchrotron Booster, a required upgrade to improve the beam brightness in the LHC injector chain. A volume production RF ion source, based on the design of the DESY RF source was implemented, but showed considerable electron dump ablation during operation at 45 keV beam energy. To reduce the electron beam power density in the dump, a magnetized Einzel lens is designed that reduces the beam energy to 10 keV before permanentmagnets dump the electrons on a tungsten surface. Presented in this paper are simulations of the design using IBSimu, the tunable range of parameters depending on the extracted H− and electron current, as well as details of the implementation, the choice of pulsed power converters and the electrode alignment system. In addition, simulations of proton extraction from this source will be shown.

  3. Beam Cleaning and Collimation Systems

    CERN Document Server

    Redaelli, S

    2016-01-01

    Collimation systems in particle accelerators are designed to dispose of unavoidable losses safely and efficiently during beam operation. Different roles are required for different types of accelerator. The present state of the art in beam collimation is exemplified in high-intensity, high-energy superconducting hadron colliders, like the CERN Large Hadron Collider (LHC), where stored beam energies reach levels up to several orders of magnitude higher than the tiny energies required to quench cold magnets. Collimation systems are essential systems for the daily operation of these modern machines. In this document, the design of a multistage collimation system is reviewed, taking the LHC as an example case study. In this case, unprecedented cleaning performance has been achieved, together with a system complexity comparable to no other accelerator. Aspects related to collimator design and operational challenges of large collimation systems are also addressed.

  4. ITER Neutral Beam Injection System

    International Nuclear Information System (INIS)

    Ohara, Yoshihiro; Tanaka, Shigeru; Akiba, Masato

    1991-03-01

    A Japanese design proposal of the ITER Neutral Beam Injection System (NBS) which is consistent with the ITER common design requirements is described. The injection system is required to deliver a neutral deuterium beam of 75MW at 1.3MeV to the reactor plasma and utilized not only for plasma heating but also for current drive and current profile control. The injection system is composed of 9 modules, each of which is designed so as to inject a 1.3MeV, 10MW neutral beam. The most important point in the design is that the injection system is based on the utilization of a cesium-seeded volume negative ion source which can produce an intense negative ion beam with high current density at a low source operating pressure. The design value of the source is based on the experimental values achieved at JAERI. The utilization of the cesium-seeded volume source is essential to the design of an efficient and compact neutral beam injection system which satisfies the ITER common design requirements. The critical components to realize this design are the 1.3MeV, 17A electrostatic accelerator and the high voltage DC acceleration power supply, whose performances must be demonstrated prior to the construction of ITER NBI system. (author)

  5. Steel Tape-wound Cut Cores as Magnet Yokes for the Beam Dump Kickers of the Large Hadron Collider

    CERN Document Server

    Mayer, M; Jansson, U; Fox, D

    2004-01-01

    Fast pulsed magnets, also called kickers, are used in particle accelerators for beam injection, extraction and similar applications. To excite these magnets, typically current pulses with rise and fall times in the range of 100 ns to 10 µs, with pulse duration of up to 100 µs and amplitudes in the order of kilo Amperes, are used. The short rise time imposes low inductance circuits and high voltage operation. The yokes are usually made out of ferrite, with reaches field saturation at about 0.5 T.

  6. PLT neutral beam injection systems

    International Nuclear Information System (INIS)

    Menon, M.M.; Barber, G.C.; Blue, C.W.

    1979-01-01

    A brief description of the Princeton Large Torus (PLT) neutral beam injection system is given and its performance characteristics are outlined. A detailed operational procedure is included, as are some tips on troubleshooting. Proper operation of the source is shown to be a crucial factor in system performance

  7. First operational experience with the LHC machine protection system when operating with beam energies beyond the 100MJ range

    CERN Document Server

    Assmann, R; Ferro-Luzzi, M; Goddard, B; Lamont, M; Schmidt, R; Siemko, A; Uythoven, J; Wenninger, J; Zerlauth, M

    2012-01-01

    The Large Hadron Collider (LHC) at CERN has made remarkable progress during 2011, surpassing its ambitious goal for the year in terms of luminosity delivered to the LHC experiments. This achievement was made possible by a progressive increase of beam intensities by more than 5 orders of magnitude during the first months of operation, reaching stored beam energies beyond the 100MJ range at the end of the year, less than a factor of 4 from the nominal design value. The correct functioning of the machine protection systems is vital during the different operational phases, for initial operation and even more when approaching nominal beam parameters where already a small fraction of the stored energy is sufficient to damage accelerator equipment or experiments in case of uncontrolled beam loss. Safe operation of the machine in presence of such high intensity proton beams is guaranteed by the interplay of many different systems: beam dumping system, beam interlocks, beam instrumentation, equipment monitoring, colli...

  8. The ELENA Beam Diagnostics Systems

    CERN Document Server

    Tranquille, G

    2013-01-01

    The Extra Low ENergy Antiproton ring (ELENA) to be built at CERN is aimed at substantially increasing the number of antiprotons to the low energy antiproton physics community. It will be a small machine which will decelerate low intensity beams (<4x107) from 5.3 MeV to 100 keV and will be equipped with an electron cooler to avoid beam losses during the deceleration and to significantly reduce beam phase space at extraction. To measure the beam parameters from the extraction point of the Antiproton Decelerator (AD), through the ELENA ring and all the way to the experiments, many systems will be needed to ensure that the desired beam characteristics are obtained. Particular attention needs to be paid to the performance of the electron cooler which depends on reliable instrumentation in order to efficiently cool the antiprotons. This contribution will present the different monitors that have been proposed to measure the various beam parameters as well as some of the developments going on to further improve th...

  9. Review of the abort dump shown in the SSC [superconducting super collider] conceptual design report

    International Nuclear Information System (INIS)

    Cossairt, J.D.

    1987-04-01

    This report details the design of the abort dump for the Superconducting Super-Collider (SSC). The dump is made from graphite and designed to absorb the maximum beam energy of 400 MJ. The report considers long time activation effects of the dump components. The report concludes that the basic design of the abort dump is well defined

  10. Bevalac beam transport system

    International Nuclear Information System (INIS)

    Avery, R.; Behrsing, G.; Morgado, R.; Rondeau, D.; Salsig, W.; Selph, F.; Staples, J.; Yourd, R.

    1975-03-01

    The Bevalac consists of, in part, a 200 meter long transfer line between the SuperHILAC and the Bevatron, which are at differing elevation. Unique features in the construction of the transfer line are described. The line, located largely outside, must cope with a natural environment. Part of the line passes through a hillside, requiring some unique support and alignment techniques. The dipoles are of the tape-wound variety and the steering magnets use printed circuit conductors. The vacuum system and an inexpensive and effective destructive monitoring system are described. (U.S.)

  11. TFTR neutral beam power system

    International Nuclear Information System (INIS)

    Deitz, A.; Murray, H.; Winje, R.

    1977-01-01

    The TFTR NB System will be composed of four beam lines, each containing three ion sources presently being developed for TFTR by the Lawrence Berkeley Laboratories (LBL). The Neutral Beam Power System (NBPS) will provide the necessary power required to operate these Ion Sources in both an experimental or operational mode as well as test mode. This paper describes the technical as well as the administrative/management aspects involved in the development and building of this system. The NBPS will combine the aspects of HV pulse (120 kV) and long pulse width (0.5 sec) together to produce a high power system that is unique in the Electrical Engineering field

  12. Proton beam therapy control system

    Science.gov (United States)

    Baumann, Michael A [Riverside, CA; Beloussov, Alexandre V [Bernardino, CA; Bakir, Julide [Alta Loma, CA; Armon, Deganit [Redlands, CA; Olsen, Howard B [Colton, CA; Salem, Dana [Riverside, CA

    2008-07-08

    A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

  13. H- beam neutralization measurements in a solenoidal beam transport system

    International Nuclear Information System (INIS)

    Sherman, J.; Pitcher, E.; Stevens, R.; Allison, P.

    1992-01-01

    H minus beam space-charge neutralization is measured for 65-mA, 35-keV beams extracted from a circular-aperture Penning surface-plasma source, the small-angle source. The H minus beam is transported to a RFQ matchpoint by a two-solenoid magnet system. Beam noise is typically ±4%. A four-grid analyzer is located in a magnetic-field-free region between the two solenoid magnets. H minus potentials are deduced from kinetic energy measurements of particles (electrons and positive ions) ejected radially from the beam channel by using a griddled energy analyzer. Background neutral gas density is increased by the introduction of additional Xe and Ar gases, enabling the H minus beam to become overneutralized

  14. Antares automatic beam alignment system

    International Nuclear Information System (INIS)

    Appert, Q.; Swann, T.; Sweatt, W.; Saxman, A.

    1980-01-01

    Antares is a 24-beam-line CO 2 laser system for controlled fusion research, under construction at Los Alamos Scientific Laboratory (LASL). Rapid automatic alignment of this system is required prior to each experiment shot. The alignment requirements, operational constraints, and a developed prototype system are discussed. A visible-wavelength alignment technique is employed that uses a telescope/TV system to view point light sources appropriately located down the beamline. Auto-alignment is accomplished by means of a video centroid tracker, which determines the off-axis error of the point sources. The error is nulled by computer-driven, movable mirrors in a closed-loop system. The light sources are fiber-optic terminations located at key points in the optics path, primarily at the center of large copper mirrors, and remotely illuminated to reduce heating effects

  15. Limitations of dynamic beam delivery systems

    International Nuclear Information System (INIS)

    Chu, W.T.; Kuenning, R.W.

    1987-01-01

    The heavy charged-particle beams which have been extracted from the accelerator and channeled to the treatment rooms are usually small in diameter compared to the target volumes. Many different methods have been devised to spread out the beams in order to cover the entire target volume with a uniform dose. When using the double-scattering beam delivery method, the entire target volume is irradiated simultaneously; whereas, in the other beam delivery methods, such as the wobbler system or the raster scanning system, a relatively small beam spot is moved around to cover the entire target volume with a uniform dose and only a part of the target volume is irradiated at a time. The latter methods are therefore called dynamic beam delivery methods, and the double scattering method is called a passive beam delivery method. In this note, the dose uniformities achievable using the dynamic beam delivery systems are analyzed, and the requirements placed on the systems specifications are discussed

  16. The design, fabrication and operation of the mechanical systems for the Neutral Beam Engineering Test Facility

    International Nuclear Information System (INIS)

    Patterson, J.A.; Fong, M.; Koehler, G.W.; Low, W.; Purgalis, P.; Wells, R.P.

    1983-01-01

    The Neutral Beam Engineering Test Facility (NBETF) at the Lawrence Berkeley Laboratory (LBL) is a National Test Facility used to develop long pulse Neutral Beam Sources. The Facility will test sources up to 120 keV, 50 A, with 30 s beam-on times with a 10% duty factor. For this application, an actively cooled beam dump is required and one has been constructed capable of dissipating a wide range of power density profiles. The flexibility of the design is achieved by utilizing a standard modular panel design which is incorporated into a moveable support structure comprised of eight separately controllable manipulator assemblies. The thermal hydraulic design of the panels permits the dissipation of 2 kW/cm 2 anywhere on the panel surface. The cooling water requirements of the actively cooled dump system are provided by the closed loop Primary High Pressure Cooling Water System. To minimize the operating costs of continuously running this high power system, a variable speed hydraulic drive is used for the main pump. During beam pulses, the pump rotates at high speed, then cycles to low speed upon completion of the beam shot. A unique neutralizer design has been installed into the NBETF beamline. This is a gun-drilled moveable brazed assembly which provides continuous armoring of the beamline near the source. The unit penetrates the source mounting valve during operation and retracts to permit the valve to close as needed. The beamline also has an inertially cooled duct calorimeter assembly. This assembly is a moveable hinged matrix of copper plates that can be used as a beam stop up to pulse lengths of 50 ms. The beamline is also equipped with many beam scraper plates of differing detail design and dissipation capabilities

  17. Evaluation of a fast PLC module in prospect of the LHC beam interlock system

    CERN Document Server

    Zaera-Sanz, Manuel

    2005-01-01

    The LHC Beam Interlock system requires a controller performing a simple matrix function to collect the different beam dump requests. To satisfy the expected safety level of the Interlock, the system should be robust and reliable. The PLC is a promising candidate to fulfil both aspects but too slow to meet the expected response time which is of the order of mseconds. Siemens has introduced a “so called” fast module (FM352-5 Boolean Processor) that provides independent and extremely fast control of a process within a larger control system using an onboard processor, a Field Programmable Gate Array (FPGA), to execute code in parallel which results in extremely fast scan times. It is interesting to investigate its features and to evaluate it as a possible candidate for the beam interlock system. This note publishes the results of this study. As well, this note could be useful for other applications requiring fast processing using a PLC.

  18. On Optimal Dumping.

    OpenAIRE

    Lahiri, Sajal; Sheen, Jeffrey

    1990-01-01

    It is generally believed that, in the absence of retaliation, a country can enhance its welfare by dumping its product on another country. Antidumping policies, in the form of countervailing duties, are usually introduced by the dumped-upon countries. In this paper, the authors show that it may in fact be in the social interest of the dumping country to introduce a "voluntary dumping restraint" policy. It is also shown that such a policy can be enacted without the government having to forbid ...

  19. Assessment of the governance system for the management of the East Sea-Jung dumping site, Korea through analysis of heavy metal concentrations in bottom sediments

    Science.gov (United States)

    Song, Ki-Hoon; Choi, Ki-Young; Kim, Chang-Joon; Kim, Young-Il; Chung, Chang-Soo

    2015-12-01

    sediments. As a result, this site can be considered as uncontaminated or slightly contaminated. This implies that the efforts made by the Korea government to manage and govern the dumping site through various policies, including `the focal point system', `the responsibility zones system' and `the principle of pollution causing party liability', have been successful.

  20. Integrated control system for electron beam processes

    Science.gov (United States)

    Koleva, L.; Koleva, E.; Batchkova, I.; Mladenov, G.

    2018-03-01

    The ISO/IEC 62264 standard is widely used for integration of the business systems of a manufacturer with the corresponding manufacturing control systems based on hierarchical equipment models, functional data and manufacturing operations activity models. In order to achieve the integration of control systems, formal object communication models must be developed, together with manufacturing operations activity models, which coordinate the integration between different levels of control. In this article, the development of integrated control system for electron beam welding process is presented as part of a fully integrated control system of an electron beam plant, including also other additional processes: surface modification, electron beam evaporation, selective melting and electron beam diagnostics.

  1. Optimal allocation and sizing of PV/Wind/Split-diesel/Battery hybrid energy system for minimizing life cycle cost, carbon emission and dump energy of remote residential building

    International Nuclear Information System (INIS)

    Ogunjuyigbe, A.S.O.; Ayodele, T.R.; Akinola, O.A.

    2016-01-01

    Highlights: • Genetic Algorithm is used for tri-objective design of hybrid energy system. • The objective is minimizing the Life Cycle Cost, CO 2 emissions and dump energy. • Small split diesel generators are used in place of big single diesel generator. • The split diesel generators are aggregable based on certain set of rules. • The proposed algorithm achieves the set objectives (LCC, CO 2 emission and dump). - Abstract: In this paper, a Genetic Algorithm (GA) is utilized to implement a tri-objective design of a grid independent PV/Wind/Split-diesel/Battery hybrid energy system for a typical residential building with the objective of minimizing the Life Cycle Cost (LCC), CO 2 emissions and dump energy. To achieve some of these objectives, small split Diesel generators are used in place of single big Diesel generator and are aggregable based on certain set of rules depending on available renewable energy resources and state of charge of the battery. The algorithm was utilized to study five scenarios (PV/Battery, Wind/Battery, Single big Diesel generator, aggregable 3-split Diesel generators, PV/Wind/Split-diesel/Battery) for a typical load profile of a residential house using typical wind and solar radiation data. The results obtained revealed that the PV/Wind/Split-diesel/Battery is the most attractive scenario (optimal) having LCC of $11,273, COE of 0.13 ($/kW h), net dump energy of 3 MW h, and net CO 2 emission of 13,273 kg. It offers 46%, 28%, 82% and 94% reduction in LCC, COE, CO 2 emission and dump energy respectively when compared to a single big Diesel generator scenario.

  2. Beam monitoring system for intense neutron source

    International Nuclear Information System (INIS)

    Tron, A.M.

    2001-01-01

    Monitoring system realizing novel principle of operation and allowing to register a two-dimensional beam current distribution within entire aperture (100...200 mm) of ion pipe for a time in nanosecond range has been designed and accomplished for beam control of the INR intense neutron source, for preventing thermo-mechanical damage of its first wall. Key unit of the system is monitor of two-dimensional beam current distribution, elements of which are high resistant to heating by the beam and to radiation off the source. The description of the system and monitor are presented. Implementation of the system for the future sources with more high intensities are discussed. (author)

  3. Ocean Dumping Control Act

    International Nuclear Information System (INIS)

    1975-01-01

    This Act provides for the control of dumping of wastes and other substances in the ocean in accordance with the London Convention of 1972 on Prevention of Marine Pollution by the Dumping of Wastes and other Matter to which Canada is a Party. Radioactive wastes are included in the prohibited and restricted substances. (NEA)

  4. Reliability study of the Controls Interlocks Beam Dumping System CIBDS V5

    CERN Document Server

    Blumenschein, Miriam Ruth

    2017-01-01

    The CIBDS V5 reliability study includes a failure mode and effect analysis, a failure rate prediction and a fault tree analysis. The different steps of these analyses, the assumptions as well as the results are summarised in this note.

  5. Wideband current transformers for the surveillance of the beam extraction kicker system of the Large Hadron Collider

    CERN Document Server

    Defrance, C; Ducimetière, L; Vossenberg, E

    2007-01-01

    The LHC beam dumping system must protect the LHC machine from damage by reliably and safely extracting and absorbing the circulating beams when requested. Two sets of 15 extraction kicker magnets form the main active part of this system. A separate high voltage pulse generator powers each magnet. Because of the high beam energy and the consequences which could result from significant beam loss due to a malfunctioning of the dump system the magnets and generators are continuously surveyed in order to generate a beam abort as soon as an internal fault is detected. Amongst these surveillance systems, wideband current transformers have been designed to detect any erratic start in one of the generators. Output power should be enough to directly re-trigger all the power trigger units of the remaining 14 generators. The current transformers were developed in collaboration with industry. To minimize losses, high-resistivity cobalt alloy was chosen for the cores. The annealing techniques originally developed for LEP b...

  6. New ORNL neutral beam transport system

    International Nuclear Information System (INIS)

    Stirling, W.L.; Davis, R.C.; Haselton, H.H.; Schnechter, D.E.; Tsai, C.C.

    1977-01-01

    The Princeton Large Torus (PLT) neutral beam injection systems have proven themselves to be a solid foundation on which next generation systems can be based. There are two areas in the new systems receiving particular emphasis: (a) increased power per beam line and (b) higher beam transmission efficiency. Two different methods are being investigated to improve the transmission efficiency. First the drift tube region, the region of the beam line between the vacuum chamber housing the ion source and the torus, is being enlarged. In this manner a second, large cryopump will be installed in the drift tube to lower the pressure to approx.10 -5 torr. Thus, neutral beam reionization on the background gas will be significantly reduced from the measured losses at a few 10 -4 torr of the PLT system. Second, the beam divergence will be reduced by application of one or more of three known techniques developed on a single aperture source in the laboratory. Each of these methods has shown a reduction in single beamlet divergence from theta/sub HWHM/ approx. 1 0 to approx.0.5 0 . The low beamlet divergence coupled with a differentially pumped drift tube will effectively accommodate the larger ion sources under development. All future beam line systems will benefit either directly or indirectly from the experience gained operating and upgrading the PLT beam line concept

  7. Ocean Dumping: International Treaties

    Science.gov (United States)

    The London Convention and London Protocol are global treaties to protect the marine environment from pollution caused by the ocean dumping of wastes. The Marine, Protection, Research and Sanctuaries Act implements the requirements of the LC.

  8. Egg dumping in insects.

    Science.gov (United States)

    Tallamy, Douglas W

    2005-01-01

    Females that place eggs under the care of conspecifics have been labeled egg dumpers. Egg dumping is an effective reproductive alternative that lowers risks for, and has the potential to increase fecundity in, its practitioners. Although insect egg dumpers can be social parasites of the maternal behavior of egg recipients, dumping is more likely to be a viable reproductive alternative when the costs to egg recipients are low and thus the defense by potential hosts against egg dumping intrusions is minimal. These conditions are met in insects that guard only eggs or in insects whose eggs hatch into self-supporting precocial young that need little beyond defense from parents. When this is the case, egg dumping is favored by natural and/or kin selection as a mechanism by which dumpers can avoid parental risks and increase fecundity, and egg recipients can enhance offspring survival by diluting predation.

  9. On the evening of June 15, 2008, ALICE physicists saw the first tracks at LHC during the first injection test in transfer line TI 2. The Silicon Pixel detector recorded muon tracks produced in the beam dump near Point 2 of the LHC.

    CERN Multimedia

    Manzari, Vito

    2008-01-01

    On the evening of June 15, 2008, ALICE physicists saw the first tracks at LHC during the first injection test in transfer line TI 2. The Silicon Pixel detector recorded muon tracks produced in the beam dump near Point 2 of the LHC

  10. Advanced Light Source beam diagnostics systems

    International Nuclear Information System (INIS)

    Hinkson, J.

    1993-10-01

    The Advanced Light Source (ALS), a third-generation synchrotron light source, has been recently commissioned. Beam diagnostics were very important to the success of the operation. Each diagnostic system is described in this paper along with detailed discussion of its performance. Some of the systems have been in operation for two years. Others, in the storage ring, have not yet been fully commissioned. These systems were, however, working well enough to provide the essential information needed to store beam. The devices described in this paper include wall current monitors, a beam charge monitor, a 50 ohm Faraday cup, DC current transformers, broad-hand striplines, fluorescence screens, beam collimators and scrapers, and beam position monitors. Also, the means by which waveforms are digitized and displayed in the control room is discussed

  11. Vibrations and stability of complex beam systems

    CERN Document Server

    Stojanović, Vladimir

    2015-01-01

     This book reports on solved problems concerning vibrations and stability of complex beam systems. The complexity of a system is considered from two points of view: the complexity originating from the nature of the structure, in the case of two or more elastically connected beams; and the complexity derived from the dynamic behavior of the system, in the case of a damaged single beam, resulting from the harm done to its simple structure. Furthermore, the book describes the analytical derivation of equations of two or more elastically connected beams, using four different theories (Euler, Rayleigh, Timoshenko and Reddy-Bickford). It also reports on a new, improved p-version of the finite element method for geometrically nonlinear vibrations. The new method provides more accurate approximations of solutions, while also allowing us to analyze geometrically nonlinear vibrations. The book describes the appearance of longitudinal vibrations of damaged clamped-clamped beams as a result of discontinuity (damage). It...

  12. PLS beam position measurement and feedback system

    International Nuclear Information System (INIS)

    Huang, J.Y.; Lee, J.; Park, M.K.; Kim, J.H.; Won, S.C.

    1992-01-01

    A real-time orbit correction system is proposed for the stabilization of beam orbit and photon beam positions in Pohang Light Source. PLS beam position monitoring system is designed to be VMEbus compatible to fit the real-time digital orbit feedback system. A VMEbus based subsystem control computer, Mil-1553B communication network and 12 BPM/PS machine interface units constitute digital part of the feedback system. With the super-stable PLS correction magnet power supply, power line frequency noise is almost filtered out and the dominant spectra of beam obtit fluctuations are expected to appear below 15 Hz. Using DSP board in SCC for the computation and using an appropriate compensation circuit for the phase delay by the vacuum chamber, PLS real-time orbit correction system is realizable without changing the basic structure of PLS computer control system. (author)

  13. Preliminary design of the new Proton Synchrotron Internal Dump core

    CERN Document Server

    AUTHOR|(CDS)2091975; Nuiry, François-Xavier

    The luminosity of the LHC particle accelerator at CERN is planned to be upgraded in the first half of 2020s, requiring also the upgrade of its injector accelerators, including the Proton Synchrotron (PS). The PS Internal Dumps are beam dumps located in the PS accelerator ring. They are safety devices designed to stop the circulating proton beam in order to protect the accelerator from damage due to an uncontrolled beam loss. The PS Internal Dumps need to be upgraded to be able to withstand the future higher intensity and energy proton beams. The dump core is a block of material interacting with the beam. It is located in ultra-high vacuum and moved into the beam path in 150 milliseconds by an electromagnet and spring-based actuation mechanism. The circulating proton beam is shaved by the core surface during thousands of beam revolutions. The preliminary new dump core design weighs 13 kilograms and consists of an isostatically pressed fine-grain graphite and a precipitation hardened copper alloy CuCrZr. The ...

  14. A simple electron-beam lithography system

    DEFF Research Database (Denmark)

    Mølhave, Kristian; Madsen, Dorte Nørgaard; Bøggild, Peter

    2005-01-01

    A large number of applications of electron-beam lithography (EBL) systems in nanotechnology have been demonstrated in recent years. In this paper we present a simple and general-purpose EBL system constructed by insertion of an electrostatic deflector plate system at the electron-beam exit...... of the column of a scanning electron microscope (SEM). The system can easily be mounted on most standard SEM systems. The tested setup allows an area of up to about 50 x 50 pm to be scanned, if the upper limit for acceptable reduction of the SEM resolution is set to 10 run. We demonstrate how the EBL system can...

  15. High power 1 MeV neutral beam system and its application plan for the international tokamak experimental reactor

    Energy Technology Data Exchange (ETDEWEB)

    Hemsworth, R.S. [ITER Joint Central Team, Naka, Ibaraki (Japan)

    1997-03-01

    This paper describes the Neutral Beam Injection system which is presently being designed for the International Tokamak Experimental Reactor, ITER, in Europe Japan and Russia, with co-ordination by the Joint Central Team of ITER at Naka, Japan. The proposed system consists of three negative ion based neutral injectors, delivering a total of 50 MW of 1 MeV D{sup 0} to the ITER plasma for a pulse length of >1000 s. Each injectors uses a single caesiated volume arc discharge negative ion source, and a multi-grid, multi-aperture accelerator, to produce about 40 A of 1 MeV D{sup -}. This will be neutralized by collisions with D{sub 2} in a sub-divided gas neutralizer, which has a conversion efficiency of about 60%. The charged fraction of the beam emerging from the neutralizer is dumped in an electrostatic residual ion dump. A water cooled calorimeter can be moved into the beam path to intercept the neutral beam, allowing commissioning of the injector independent of ITER. ITER is scheduled to produce its first plasma at the beginning of 2008, and the planning of the R and D, construction and installation foresees the neutral injection system being available from the start of ITER operations. (author)

  16. A machine protection beam position monitor system

    International Nuclear Information System (INIS)

    Medvedko, E.; Smith, S.; Fisher, A.

    1998-01-01

    Loss of the stored beam in an uncontrolled manner can cause damage to the PEP-II B Factory. We describe here a device which detects large beam position excursions or unexpected beam loss and triggers the beam abort system to extract the stored beam safely. The bad-orbit abort trigger beam position monitor (BOAT BPM) generates a trigger when the beam orbit is far off the center (>20 mm), or rapid beam current loss (dI/dT) is detected. The BOAT BPM averages the input signal over one turn (136 kHz). AM demodulation is used to convert input signals at 476 MHz to baseband voltages. The detected signal goes to a filter section for suppression of the revolution frequency, then on to amplifiers, dividers, and comparators for position and current measurements and triggering. The derived current signal goes to a special filter, designed to perform dI/dT monitoring at fast, medium, and slow current loss rates. The BOAT BPM prototype test results confirm the design concepts

  17. A simple electron-beam lithography system

    International Nuclear Information System (INIS)

    Moelhave, Kristian; Madsen, Dorte Noergaard; Boeggild, Peter

    2005-01-01

    A large number of applications of electron-beam lithography (EBL) systems in nanotechnology have been demonstrated in recent years. In this paper we present a simple and general-purpose EBL system constructed by insertion of an electrostatic deflector plate system at the electron-beam exit of the column of a scanning electron microscope (SEM). The system can easily be mounted on most standard SEM systems. The tested setup allows an area of up to about 50x50 μm to be scanned, if the upper limit for acceptable reduction of the SEM resolution is set to 10 nm. We demonstrate how the EBL system can be used to write three-dimensional nanostructures by electron-beam deposition

  18. 650-nJ pulses from a cavity-dumped Yb:fiber-pumped ultrafast optical parametric oscillator.

    Science.gov (United States)

    Lamour, Tobias P; Reid, Derryck T

    2011-08-29

    Sub-250-fs pulses with energies of up to 650 nJ and peak powers up to 2.07 MW were generated from a cavity-dumped optical parametric oscillator, synchronously-pumped at 15.3 MHz with sub-400-fs pulses from an Yb:fiber laser. The average beam quality factor of the dumped output was M2 ~1.2 and the total relative-intensity noise was 8 mdBc, making the system a promising candidate for ultrafast laser inscription of infrared materials.

  19. Dump and Current Measurement of Unstripped H`ions at the Injection from the CERN LINAC4 Into the PS Booster

    CERN Document Server

    Chamizo, R; Goddard, B; Mereghetti, A; Versaci, R; Weterings, W

    2010-01-01

    Linac4 is the new H- linear accelerator under construction at CERN aiming to double the brightness of the beam injected to the CERN PS Booster (PSB) for delivering proton beams to experiments or further CERN accelerators, down to the LHC. The injection system in the PSB is based on the H- charge exchange where the 160 MeV H- beam is converted into an H+ beam by stripping the electrons with a carbon foil. A beam dump located inside a pulsed magnet for the injection bump will intercept the unstripped ions (H0 and H-) and measure the collected charge to detect the relative efficiency and degradation of the stripping foil. The challenge of the dump design is to meet the requirements of a beam dump providing a current measurement and at the same time minimizing the perturbation of the magnetic field of the surrounding pulsed magnet. This paper describes all phases of the dump design and the main issues related to its integration in the line.

  20. Allegheny County Illegal Dump Sites

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — The Illegal Dump Site dataset includes information on illegal dump sites, their type of trash, and the estimate tons of trash at each site. The information was...

  1. The AGS Booster Beam Position Monitor system

    International Nuclear Information System (INIS)

    Ciardullo, D.J.; Abola, A.; Beadle, E.R.; Smith, G.A.; Thomas, R.; Van Zwienen, W.; Warkentien, R.; Witkover, R.L.

    1991-01-01

    To accelerate both protons and heavy ions, the AGS Booster requires a broadband (multi-octave) beam position monitoring system with a dynamic range spanning several orders of magnitude (2 x 10 10 to 1.5 x 10 13 particles per pulse). System requirements include the ability to acquire single turn trajectory and average orbit information with ± 0.1 mm resolution. The design goal of ± 0.5 mm corrected accuracy requires that the detectors have repeatable linear performance after periodic bakeout at 300 degree C. The system design and capabilities of the Booster Beam Position Monitor will be described, and initial results presented. 7 refs., 5 figs

  2. A beam diagnostic system for ELSA

    International Nuclear Information System (INIS)

    Schillo, M.; Althoff, K.H.; Drachenfels, W.; Goetz, T.; Husmann, D.; Neckenig, M.; Picard, M.; Schittko, F.J.; Schauerte, W.; Wenzel, J.

    1991-01-01

    A beam diagnostic system, which is based on capacitive beam-position monitors combined with fast electronics, has been developed for the Bonn ELectron Stretcher Accelerator ELSA. The position signal of each monitor is digitized at an adjustable sampling rate (max.: 10 MHz) and the most recent 8192 position and intensity values are buffered. This allows a wide range of different beam diagnostic measurements. The main purpose is the closed-orbit correction, which can be carried out on various time scales. To optimize the duty factor of the extracted beam, the system can also be used as a fast relative intensity monitor resolving the intensity distribution of the bunches or of the injected beam. It is designed to support betatron tune and phase measurements with very high accuracy, offering the choice to select any of the beam position monitors. This enables the measuring of many optical parameters. Furthermore any pair of suitable monitors can be used for experimental particle tracking or phase space measurements

  3. Final focus system for high intensity beams

    Directory of Open Access Journals (Sweden)

    Enrique Henestroza

    2005-05-01

    Full Text Available The neutralized transport experiment (NTX at the Heavy Ion Fusion Virtual National Laboratory is exploring the performance of neutralized final-focus systems for high perveance heavy ion beams. The final-focus scenario in a heavy ion fusion driver consists of several large aperture quadrupole magnets followed by a drift section in which the beam space charge is neutralized by a plasma. This beam is required to hit a millimeter-sized target spot at the end of the drift section. The objective of the NTX experiments and associated theory and simulations is to study the various physical mechanisms that determine the final spot size (radius r_{s} at a given distance (f from the end of the last quadrupole. In a fusion driver, f is the standoff distance required to keep the chamber wall and superconducting magnets properly protected. The NTX final quadrupole focusing system produces a converging beam at the entrance to the neutralized drift section where it focuses to a small spot. The final spot is determined by the conditions of the beam entering the quadrupole section, the beam dynamics in the magnetic lattice, and the plasma neutralization dynamics in the drift section. The main issues are the control of emittance growth due to high order fields from magnetic multipoles and image fields. In this paper, we will describe the theoretical and experimental aspects of the beam dynamics in the quadrupole lattice, and how these physical effects influence the final beam size. In particular, we present theoretical and experimental results on the dependence of final spot size on geometric aberrations and perveance.

  4. Corrected electrostatic lens systems for ion beams

    International Nuclear Information System (INIS)

    Dalgish, R.L.

    1981-01-01

    Recent work in our laboratory has introduced a new class of electrostatic focus forming element for beams, the ELCO lens. It compares favourably with the electrostatic and magnetic quadrupole elements conventionally used for microbeam formation. The ELCO lens does however have disadvantages associated with apertures and alignment. We have continued with the development of ion beam lenses and have evolved a further class of lens element which eliminates aperture and alignment problems. This new element can be combined like optical lenses into an aberration corrected system. Experimental measurement on the basic lens element has confirmed mathematical analysis of ion trajectories through the element. This mathematical analysis predicts that the basic element can be combined into a corrected lens system for, either: (1) high resolution microprobe formation with intrinsic rastering ability, the spot size limited only by the beam properties; or (2) high quality image formation with large magnification/demagnification ratio and wide angular aperture. (orig.)

  5. The diagnostic neutral beam system for text

    International Nuclear Information System (INIS)

    Hammond, D.P.; Burgin, D.; Coupland, J.R.; DeVere, A.P.C.; Green, T.S.; Klein, H.H.

    1986-01-01

    The detection of highly stripped impurity ions in a Tokamak plasma by means of charge exchange with a probing neutral beam is an interesting and developing technique. Such a beam system is being designed and manufactured by the Culham Laboratory under contract to the University of Texas at Austin. The specification is for a high brightness beam of hydrogen atoms of 30-50 keV energy with a current density of 30 mA/cm/sup 2/ in the target plane. The pulse length is 100 mS, and the beam has to be capable of being modulated at high frequency (≥ 1 KHz) to improve the overall detection capability of the diagnostic system. The total extracted current at 50 KV is 7.2A. The design has been based on a ''bucket'' type plasma source with a four-electrode extraction array of circular apertures. Low perveance extraction is used to obtain both high brightness and freedom from high voltage breakdown, in view of the high degree of reliability needed. Details of performance of the beam line measured during commissioning tests at Culham are given

  6. Beam Interlocks for LHC and SPS

    CERN Document Server

    Dinius, A; Gimeno-Vicente, J; Nouchi, P; Puccio, B; Schmidt, R; Wenninger, J

    2003-01-01

    The Large Hadron Collider at CERN (LHC) will operate at 7 TeV/c with a luminosity of 10 cms. This requires two beams with about 3^10 protons/beam, corresponding to a stored energy of about 350 MJ, sufficient to heat and melt 500 kg of copper. Protection of equipment from damage in case of uncontrolled beam losses is challenging. Injection of the beam from the SPS to the LHC could already damage equipment and is only permitted when all LHC systems are correctly prepared. In case of an uncontrolled loss of the circulating LHC beams, it is required to extract the beams into a specially designed target as soon as possible. Beam loss monitors and equipment for hardware surveillance are distributed around the 26 km long accelerator. In case of failures or beam losses, the beam interlock system is informed and sends a dump request to the beam dumping system. The beam interlock system also inhibits injection when the LHC is not ready for beam. In this paper the requirements for the beam interlock system are discussed...

  7. The AGS Booster beam loss monitor system

    International Nuclear Information System (INIS)

    Beadle, E.R.; Bennett, G.W.; Witkover, R.L.

    1991-01-01

    A beam loss monitor system has been developed for the Brookhaven National Laboratory Booster accelerator, and is designed for use with intensities of up to 1.5 x 10 13 protons and carbon to gold ions at 50-3 x 10 9 ions per pulse. This system is a significant advance over the present AGS system by improving the sensitivity, dynamic range, and data acquisition. In addition to the large dynamic range achievable, it is adaptively shifted when high losses are detected. The system uses up to 80 argon filled ion chambers as detectors, as well as newly designed electronics for processing and digitizing detector outputs. The hardware simultaneously integrates each detector output, interfaces to the beam interrupt systems, and digitizes all 80 channels to 21 bits at 170 KHz. This paper discuses the design, construction, and operation of the system. 4 refs., 2 figs

  8. Design of the ITER (International Thermonuclear Experimental Reactor) neutral beam system beamline, United States concept

    International Nuclear Information System (INIS)

    Purgalis, P.; Anderson, O.A.; Cooper, W.S.; DeVries, G.E.; Lietzke, A.F.; Kunkel, W.B.; Kwan, J.W.; Matuk, C.A.; Nakai, T.; Stearns, J.W.; Soroka, L.; Wells, R.P.; Lindquist, W.B.; Neef, W.S.; Reginato, L.L.; Sedgley, D.W.; Brook, J.W.; Luzzi, T.E.; Myers, T.J.

    1989-01-01

    Design of a neutral beamline for ITER (International Thermonuclear Experimental Reactor) is described. The design incorporates a barium surface conversion D - source feeding a linear array of accelerator channels. The system uses a dc accelerator with electrostatic quadrupoles for strong focusing. A high voltage power supply that is integrated with the accelerator is presented as an attractive option. A gas neutralizer is used and residual ions exiting the neutralizer are deflected to watercooled dumps. Cryopanels are located at the accelerator exit to pump excess gas from the source and the neutralizer, and in the ion dump cavity to pump re-neutralized ions and neutralizer gas. All the above components are packaged in compact identical, independent modules that can be removed for remote maintenance. The neutral beam system delivers 75 MW of D degree into three ports with a total of nine modules arranged in stacks of three modules per port. To increase reliability each module is designed to deliver up to 10 MW at 1.3 MeV; this allows eight modules operating at partial capacity to deliver the required power in the event one module is removed from service. Radiation protection is provided by shielding and by locating critical components in the source and accelerator 35 m from the port into the torus. Neutron shielding in the drift duct provides the added feature of limiting conductance and thus reducing gas flow to and from the torus. Alternative component choices are also discussed for the evolving design. 8 refs., 4 figs., 1 tab

  9. Ion beam pulse radiolysis system at HIMAC

    Energy Technology Data Exchange (ETDEWEB)

    Chitose, N.; Katsumura, Y.; Domae, M.; Ishigure, K. [Tokyo Univ. (Japan); Murakami, T.

    1997-03-01

    An ion beam pulse radiolysis system has been constructed at HIMAC facility. Ion beam of 24MeV He{sup 2+} with the duration longer than 1 {mu}s is available for irradiation. Three kinds of aqueous solutions, (C{sub 6}H{sub 5}){sub 2}CO, NaHCO{sub 3}, and KSCN, were irradiated and the absorption signals corresponding to (C{sub 6}H{sub 5}){sub 2}CO{sup -}, CO{sub 3}{sup -}, and (SCN){sub 2}{sup -} respectively were observed. Ghost signals which interfere with the measurement are also discussed. (author)

  10. The CMS Beam Halo Monitor Detector System

    CERN Document Server

    CMS Collaboration

    2015-01-01

    A new Beam Halo Monitor (BHM) detector system has been installed in the CMS cavern to measure the machine-induced background (MIB) from the LHC. This background originates from interactions of the LHC beam halo with the final set of collimators before the CMS experiment and from beam gas interactions. The BHM detector uses the directional nature of Cherenkov radiation and event timing to select particles coming from the direction of the beam and to suppress those originating from the interaction point. It consists of 40 quartz rods, placed on each side of the CMS detector, coupled to UV sensitive PMTs. For each bunch crossing the PMT signal is digitized by a charge integrating ASIC and the arrival time of the signal is recorded. The data are processed in real time to yield a precise measurement of per-bunch-crossing background rate. This measurement is made available to CMS and the LHC, to provide real-time feedback on the beam quality and to improve the efficiency of data taking. In this talk we will describ...

  11. The CMS Beam Halo Monitor Detector System

    CERN Document Server

    Stifter, Kelly

    2015-01-01

    A new Beam Halo Monitor (BHM) detector system has been installed in the CMS cavern to measure the machine-induced background (MIB) from the LHC. This background originates from interactions of the LHC beam halo with the final set of collimators before the CMS experiment and from beam gas interactions. The BHM detector uses the directional nature of Cherenkov radiation and event timing to select particles coming from the direction of the beam and to supress those originating from the interaction point. It consists of 40 quartz rods, placed on each side of the CMS detector, coupled to UV sensitive PMTs. For each bunch crossing the PMT signal is digitized by a charge integrating ASIC and the arrival time of the signal is recorded. The data are processed in real time to yield a precise measurement of per-bunch-crossing background rate. This measurement is made available to CMS and the LHC, to provide real-time feedback on the beam quality and to improve the efficiency of data taking. In this talk we will descri...

  12. Implementation of EPICS based Control System for Radioisotope Beam line

    International Nuclear Information System (INIS)

    Kim, Jae-Ha; Ahn, Tae-Sung; Song, Young-Gi; Kwon, Hyeok-Jung; Cho, Yong-Sub

    2015-01-01

    Korea Mult-purpose Accelerator Complex (KOMAC) has been operating 100 MeV proton linear accelerator . For operating 100 MeV linac, various control system has been implemented such as vacuum, power supply, RCCS and etc. KOMAC is operating two beam lines so that clients can use 100 MeV proton beam for their experiment. KOMAC sends beam to beam line and target room using two dipole magnets and several quadrupole magnets. As demand for experiments and Radius Isotope using beam is increased, another beam line is under construction and RI beam line control system is need. To synchronize with KOMAC control system, RI beam line control system is based on Experimental Physics and Industrial control System (EPICS) software. The beam is transported to RI beam line to control magnet power supply and vacuum. Implementation of RI beam line control system is presented and some preliminary results are reported. The base RI beam line control system is implemented. It can control beam direction and vacuum. Comparing archived data and current data, RI beam line and control system will be improved. In the future, scroll pump and gate control system will be implemented using programmable logic controller PLC. RI beam interlock sequence will be added to KOMAC interlock system to protect linac

  13. Development of KSTAR Neutral Beam Heating System

    Energy Technology Data Exchange (ETDEWEB)

    Oh, B. H.; Song, W. S.; Yoon, B. J. (and others)

    2007-10-15

    The prototype components of a neutral beam injection (NBI) system have been developed for the KSTAR, and a capability of the manufactured components has been tested. High power ion source, acceleration power supply, other ion source power supplies, neutralizer, bending magnet for ion beam separation, calorimeter, and cryo-sorption pump have been developed by using the domestic technologies and tested for a neutral beam injection of 8 MW per beamline with a pulse duration of 300 seconds. The developed components have been continuously upgraded to achieve the design requirements. The development technology of high power and long pulse neutral beam injection system has been proved with the achievement of 5.2 MW output for a short pulse length and 1.6 MW output for a pulse length of 300 seconds. Using these development technologies, the domestic NB technology has been stabilized under the development of high power ion source, NB beamline components, high voltage and current power supplies, NB diagnostics, NB system operation and control.

  14. Beam transport

    International Nuclear Information System (INIS)

    1988-01-01

    Considerable experience has now been gained with the various beam transport lines, and a number of minor changes have been made to improve the ease of operation. These include: replacement of certain little-used slits by profile monitors (harps or scanners); relocation of steering magnets, closer to diagnostic harps or profile scanners; installation of a scanner inside the isocentric neutron therapy system; and conversion of a 2-doublet quadrupole telescope (on the neutron therapy beamline) to a 2-triplet telescope. The beam-swinger project has been delayed by very late delivery of the magnet iron to the manufacturer, but is now progressing smoothly. The K=600 spectrometer magnets have now been delivered and are being assembled for field mapping. The x,y-table with its associated mapping equipment is complete, together with the driver software. One of the experimental areas has been dedicated to the production of collimated neutron beams and has been equipped with a bending magnet and beam dump, together with steel collimators fixed at 4 degrees intervals from 0 degrees to 16 degrees. Changes to the target cooling and shielding system for isotope production have led to a request for much smaller beam spot sizes on target, and preparations have been made for rearrangement of the isotope beamline to permit installation of quadrupole triplets on the three beamlines after the switching magnet. A practical system of quadrupoles for matching beam properties to the spectrometer has been designed. 6 figs

  15. RHIC beam loss monitor system design

    International Nuclear Information System (INIS)

    Witkover, R.; Zitvogel, E.; Michnoff, R.

    1997-01-01

    The Beam Loss Monitor (BLM) System is designed to prevent the quenching of RHIC magnets due to beam loss, provide quantitative loss data, and the loss history in the event of a beam abort. The system uses 400 ion chambers of a modified Tevatron design. To satisfy fast (single turn) and slow (100 msec) loss beam criteria and provide sensitivity for studies measurements, a range of over 8 decades is needed. An RC pre-integrator reduces the dynamic range for a low current amplifier. This is digitized for data logging. The output is also applied to an analog multiplier which compensates the energy dependence, extending the range of the abort comparators. High and low pass filters separate the signal to dual comparators with independent programmable trip levels. Up to 64 channels, on 8 VME boards, are controlled by a micro-controller based VME module, decoupling it from the front-end computer (FEC) for real-time operation. Results with the detectors in the RHIC Sextant Test and the electronics in the AGS-to-RHIC (AtR) transfer line will be presented

  16. Molecular-beam epitaxial growth and ion-beam analysis systems for functional materials research

    International Nuclear Information System (INIS)

    Takeshita, H.; Aoki, Y.; Yamamoto, S.; Naramoto, H.

    1992-01-01

    Experimental systems for molecular beam epitaxial growth and ion beam analysis have been designed and constructed for the research of inorganic functional materials such as thin films and superlattices. (author)

  17. Development of beam monitoring system for proton pencil beam scanning using fiber-optic radiation sensor

    Science.gov (United States)

    Son, Jaeman; Koo, Jihye; Moon, Sunyoung; Yoon, Myonggeun; Jeong, Jonghwi; Kim, Sun-Young; Lim, Youngkyung; Lee, Se Byeong; Shin, Dongho; Kim, Meyoung; Kim, Dongwook

    2017-10-01

    We aimed to develop a beam monitoring system based on a fiber-optic radiation sensor (FORS), which can be used in real time in a beam control room, to monitor a beam in proton therapy, where patients are treated using a pencil beam scanning (PBS) mode, by measuring the beam spot width (BSW) and beam spot position (BSP) of the PBS. We developed two-dimensional detector arrays to monitor the PBS beam in the beam control room. We measured the BSW for five energies of the PBS beam and compared the measurements with those of Lynx and EBT3 film. In order to confirm the BSP, we compared the BSP values of the PBS calculated from radiation treatment planning (RTP), to five BSP values measured using FORS at 224.2 MeV. When comparing BSW values obtained using developed monitoring system to the measurements obtained using commercial EBT3 film, the average difference in BSW value of the PBS beam was 0.1 ± 0.1 mm. In the comparison of BSW values with the measurements obtained using Lynx, the average difference was 0.2 ± 0.1 mm. When comparing BSP measurements to the values calculated from RTP, the average difference was 0.4 ± 0.2 mm. The study results confirmed that the developed FORS-based beam monitoring system can monitor a PBS beam in real time in a beam control room, where proton beam is controlled for the patient.

  18. Extracted-beam-detection system around synchrotron saturne

    International Nuclear Information System (INIS)

    Anne, Remy; Milleret, Gerard; Giuliani, Arlette; Lefol, Andre; Perret, Robert; Poupard, Joseph; Trogno, Andre; Van den Bossche, Maurice; N'Guyen Sieu Viet.

    1977-07-01

    The extracted-beam-detection system working around the synchrotron Saturne is presented. The whole system is composed of about forty multiwire chambers used for beam tuning and providing beams profiles. Optic beam parameters such as position, divergence, dimension, emittance can be easily measured, or calculated with a program running on a computer. They are working in large range intensity beams (10 2 to 5.10 11 p/cm 2 /s of protons, alpha particles, deutons, pions, tritons and electrons [fr

  19. SISTEM PENGOLAHAN AIR ASAM TAMBANG PADA WATER POND DAN APLIKASI MODEL ENCAPSULATION IN-PIT DISPOSAL PADA WASTE DUMP TAMBANG BATUBARA (Acid Mine Drainage Treatment System in Water Pond and Application of Encapsulation In-Pit Disposal Model in Waste Dump

    Directory of Open Access Journals (Sweden)

    Andy R. Erwin Wijaya

    2010-03-01

    . The control system of acid mine drainage contamination included treatment of acid mine drainage into water pond and management of oxide/benign waste on the waste dump. Treatment method is neutralization of acid mine drainage into water pond using alkali reagent. The most effective and economic alkali reagent is limestone. Amount of limestone needed to neutralize of acid mine drainage (5040 m3 into water pond is 104.56 kg. The management of oxide/benign waste is application of encapsulation in-pit disposal model. This model is more effective to prevent acid mine drainage formed. Cover materials are often clay subsoils and have been used for covering to prevent oxidation. The clay have high compaction rates and low permeability (2.3148 x 10-9 m/s and this material is sufficient availability.

  20. Internally shielded beam transport and support system

    International Nuclear Information System (INIS)

    Schildkamp, W.; Brewer, H.

    1996-01-01

    Due to environmental concerns, the Advanced Photon Source has a policy that disallows any exposed lead within the facility. This creates a real problem for the beam transport system, not so much for the pipe but for the flexible coupling (bellows) sections. A complete internally shielded x-ray transport system, consisting of long transport lines joined by flexible coupling sections, has been designed for CARS sector 14 to operate either at high vacuum or as a helium flight tube. It can effectively shield against air scattering of wiggler or undulator white beam with proper placement of apertures, collimators, and masks for direct beam control. The system makes use of male- and female-style fittings that create a labyrinth allowing for continuous shielding through the flexible coupling sections. These parts are precision machined from a ternary hypereutectic lead alloy (cast under 15 inches of head pressure to assure a pinhole-free casting) then pressed into either end (rotatable vacuum flanges) of the bellows assembly. The transport pipe itself consists of a four part construction using a stepped transition ring (Z-ring) to connect an inner tube to the vacuum flange and also to a protective and supportive outer tube. The inner tube is wrapped with 1/16 double-prime pure lead sheet to a predetermined thickness following the shape of the stepped transition ring for continuous shielding. This design has been prototyped and radiation tested. copyright 1996 American Institute of Physics

  1. Beam position monitoring system at CESR

    International Nuclear Information System (INIS)

    Billing, M.G.; Bergan, W.F.; Forster, M.J.; Meller, R.E.; Rendina, M.C.; Rider, N.T.; Sagan, D.C.; Shanks, J.; Sikora, J.P.; Stedinger, M.G.; Strohman, C.R.; Palmer, M.A.; Holtzapple, R.L.

    2017-01-01

    The Cornell Electron-positron Storage Ring (CESR) has been converted from a High Energy Physics electron-positron collider to operate as a dedicated synchrotron light source for the Cornell High Energy Synchrotron Source (CHESS) and to conduct accelerator physics research as a test accelerator, capable of studying topics relevant to future damping rings, colliders and light sources. Some of the specific topics that were targeted for the initial phase of operation of the storage ring in this mode, labeled CESRTA (CESR as a Test Accelerator), included 1) tuning techniques to produce low emittance beams, 2) the study of electron cloud development in a storage ring and 3) intra-beam scattering effects. The complete conversion of CESR to CESRTA occurred over a several year period and is described elsewhere. As a part of this conversion the CESR beam position monitoring (CBPM) system was completely upgraded to provide the needed instrumental capabilities for these studies. This paper describes the new CBPM system hardware, its function and representative measurements performed by the upgraded system.

  2. Pressure rise analysis in superconducting coils during dumping

    International Nuclear Information System (INIS)

    Tada, E.; Shimamoto, S.

    1984-01-01

    This chapter describes the ALPHE computer code, whose purpose is to calculate transient helium behavior in a poolboiling coil and to determine suitable characteristics of safety devices to minimize the maximum pressure and the liquid helium lost during dumping due to quench, or when discharging without normalcy. The analysis is compared with the measurements obtained in the domestic test of the Japanese LCT coil. Topics considered include basic equations (helium behavior, heat generation), manual dump without quench, and dumping due to quench. It is demonstrated that the transient behavior, calculated by ALPHE assuming quasi-static equilibrium between helium and coil, is in good agreement with the experimental measurements observed in the domestic test of the Japanese LCT coil. The engineering technique required for the design criteria of superconducting coils and safety device during dumping is established. ALPHE can be used to design an emergency safety system for a helium refrigerator during dumping

  3. Contrastive Analysis and Research on Negative Pressure Beam Tube System and Positive Pressure Beam Tube System for Mine Use

    Science.gov (United States)

    Wang, Xinyi; Shen, Jialong; Liu, Xinbo

    2018-01-01

    Against the technical defects of universally applicable beam tube monitoring system at present, such as air suction in the beam tube, line clogging, long sampling time, etc., the paper analyzes the current situation of the spontaneous combustion fire disaster forecast of mine in our country and these defects one by one. On this basis, the paper proposes a research thought that improving the positive pressure beam tube so as to substitute the negative pressure beam tube. Then, the paper introduces the beam tube monitoring system based on positive pressure technology through theoretical analysis and experiment. In the comparison with negative pressure beam tube, the paper concludes the advantage of the new system and draws the conclusion that the positive pressure beam tube is superior to the negative pressure beam tube system both in test result and test time. At last, the paper proposes prospect of the beam tube monitoring system based on positive pressure technology.

  4. Experience with FreeStyle Libre Flash glucose monitoring system in management of refractory dumping syndrome in pregnancy shortly after bariatric surgery.

    Science.gov (United States)

    Novodvorsky, Peter; Walkinshaw, Emma; Rahman, Waliur; Gordon, Valerie; Towse, Karen; Mitchell, Sarah; Selvarajah, Dinesh; Madhuvrata, Priya; Munir, Alia

    2017-01-01

    Bariatric surgery is an effective therapy for obesity but is associated with long-term complications such as dumping syndromes and nutritional deficiencies. We report a case of a 26-year-old caucasian female, with history of morbid obesity and gestational diabetes (GDM), who became pregnant 4 months after Roux-en-Y bypass surgery. She developed GDM during subsequent pregnancy, which was initially managed with metformin and insulin. Nocturnal hypoglycaemia causing sleep disturbance and daytime somnolence occured at 19 weeks of pregnancy (19/40). Treatment with rapid-acting carbohydrates precipitated further hypoglycaemia. Laboratory investigations confirmed hypoglycaemia at 2.2 mmol/L with appropriately low insulin and C-peptide, intact HPA axis and negative IgG insulin antibodies. The patient was seen regularly by the bariatric dietetic team but concerns about compliance persisted. A FreeStyle Libre system was used from 21/40 enabling the patient a real-time feedback of changes in interstitial glucose following high or low GI index food intake. The patient declined a trial of acarbose but consented to an intraveneous dextrose infusion overnight resulting in improvement but not complete abolishment of nocturnal hypoglycaemia. Hypoglycaemias subsided at 34/40 and metformin and insulin had to be re-introduced due to high post-prandial blood glucose readings. An emergency C-section was indicated at 35 + 1/40 and a small-for-gestational-age female was delivered. There have been no further episodes of hypoglycaemia following delivery. This case illustrates challenges in the management of pregnancy following bariatric surgery. To our knowledge, this is the first use of FreeStyle Libre in dumping syndrome in pregnancy following bariatric surgery with troublesome nocturnal hypoglycaemia. Bariatric surgery represents the most effective treatment modality in cases of severe obesity. With increasing prevalence of obesity, more people are likely to undergo bariatric

  5. Active Beam Shaping System and Method Using Sequential Deformable Mirrors

    Science.gov (United States)

    Norman, Colin A. (Inventor); Pueyo, Laurent A. (Inventor)

    2015-01-01

    An active optical beam shaping system includes a first deformable mirror arranged to at least partially intercept an entrance beam of light and to provide a first reflected beam of light, a second deformable mirror arranged to at least partially intercept the first reflected beam of light from the first deformable mirror and to provide a second reflected beam of light, and a signal processing and control system configured to communicate with the first and second deformable mirrors. The first deformable mirror, the second deformable mirror and the signal processing and control system together provide a large amplitude light modulation range to provide an actively shaped optical beam.

  6. Beam Position Monitor System for PEP II

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Stephen R.; Aiello, G.Roberto; Hendrickson, Linda J.; Johnson, Ronald G.; Mills, Mark R.; Olsen, Jeff J.; /SLAC

    2011-09-12

    We describe the beam position monitor system built for PEP-II, the B-factory at SLAC. The system reports beam position for bunches of between 5 x 10{sup 8} and 8 x 10{sup 10} electron charges, either singly or as continuous streams of bunches every 4.2 ns. Resolution at full charge is to be better than 10 microns in a single turn. Higher resolution is available via on-board multi-turn averaging. The position signal is processed in a 20 MHz bandwidth around 952 MHz. This bandwidth, rather broader than that typical of RF position monitors, allows good resolution for low charge single bunches. Additional novel features include stringent control of return losses in order to minimize cross-talk between nearby bunches which may contain very different charges. The digitizing electronics is multiplexed between the two PEP-II storage rings. Design, construction, and installation experience, as well as first results with beam are presented.

  7. Design of CMS Beam Halo Monitor system

    CERN Document Server

    AUTHOR|(CDS)2078842

    2015-01-01

    A fast and directional monitoring system for the CMS experiment is designed to provide an online, bunch-by-bunch measurement of beam background induced by beam halo interactions, separately for each beam. The background detection is based on Cherenkov radiation produced in synthetic fused silica read out by a fast, UV sensitive photomultiplier tube. Twenty detector units per end will be azimuthally distributed around the rotating shielding of CMS, covering ~408 cm2 at 20.6m from the interaction point, at a radius of ~180 cm. The directional and fast response of the system allows the discrimination of the background particles from the dominant flux in the cavern induced by pp collision debris, produced within the 25 ns bunch spacing. A robust multi-layered shielding will enclose each detector unit to protect the photomultiplier tube from the magnetic field and to eliminate the occupancy from low energy particles. The design of the front-end units is validated by experimental results. An overview of the new sy...

  8. Experience with FreeStyle Libre Flash glucose monitoring system in management of refractory dumping syndrome in pregnancy shortly after bariatric surgery

    Directory of Open Access Journals (Sweden)

    Peter Novodvorsky

    2017-12-01

    Full Text Available Bariatric surgery is an effective therapy for obesity but is associated with long-term complications such as dumping syndromes and nutritional deficiencies. We report a case of a 26-year-old caucasian female, with history of morbid obesity and gestational diabetes (GDM, who became pregnant 4 months after Roux-en-Y bypass surgery. She developed GDM during subsequent pregnancy, which was initially managed with metformin and insulin. Nocturnal hypoglycaemia causing sleep disturbance and daytime somnolence occured at 19 weeks of pregnancy (19/40. Treatment with rapid-acting carbohydrates precipitated further hypoglycaemia. Laboratory investigations confirmed hypoglycaemia at 2.2 mmol/L with appropriately low insulin and C-peptide, intact HPA axis and negative IgG insulin antibodies. The patient was seen regularly by the bariatric dietetic team but concerns about compliance persisted. A FreeStyle Libre system was used from 21/40 enabling the patient a real-time feedback of changes in interstitial glucose following high or low GI index food intake. The patient declined a trial of acarbose but consented to an intraveneous dextrose infusion overnight resulting in improvement but not complete abolishment of nocturnal hypoglycaemia. Hypoglycaemias subsided at 34/40 and metformin and insulin had to be re-introduced due to high post-prandial blood glucose readings. An emergency C-section was indicated at 35 + 1/40 and a small-for-gestational-age female was delivered. There have been no further episodes of hypoglycaemia following delivery. This case illustrates challenges in the management of pregnancy following bariatric surgery. To our knowledge, this is the first use of FreeStyle Libre in dumping syndrome in pregnancy following bariatric surgery with troublesome nocturnal hypoglycaemia.

  9. Status of Beam Diagnostic Systems for the PEFP

    CERN Document Server

    Park Jang Ho; Choi Byung Ho; Ha Hwang Woon; Han, Sang-Hyo; Park, Sung-Ju; Woon Parc, Yong; Yun Huang Jung

    2005-01-01

    A proton linear accelerator is currently the construction at the KAERI (Korea Atomic Research Institute) to the PEFP (Proton Engineering Frontier Project) in Korea. We are accomplished the technique development of beam diagnostic system to be currently the construction. We treat beam diagnostics for the high power proton linear accelerator. Prototype beam position & phase monitor (BPPM) electronics was made and tested successfully in one of the beam diagnostic systems. The beam position monitor pickup electrode is a capacitive type (electrostatic type) which has a button form. Button form electrode, in common use around electron synchrotrons and storage rings, are a variant of the electrode with small button form (e.g., sub mm diameter). However, we are designed button form electrode to measure beam position of proton beam. The BCM (Beam Current Monitor) is developed Tuned CT (Current Transformer) for collaborate with Bergoz Instruments. This paper describes the status of beam diagnostic systems for the P...

  10. Managing Ocean Dumping in EPA Region 10

    Science.gov (United States)

    Overview of ocean dumping in Pacific Northwest, US. Includes materials dumped in the Region, ocean dumping permits issues, dredged material testing guidance, ocean disposal site descriptions and information, regional dredging teams and other partnerships.

  11. Managing Ocean Dumping in EPA Region 9

    Science.gov (United States)

    Overview of ocean dumping in EPA Pacific Southwest. Includes materials dumped in the Region, ocean dumping permits issues, dredged material testing guidance, ocean disposal site descriptions and information, regional dredging teams and other partnerships.

  12. Managing Ocean Dumping in EPA Region 6

    Science.gov (United States)

    Overview of ocean dumping in South Central, US. Includes materials dumped in the Region, ocean dumping permits issues, dredged material testing guidance, ocean disposal site descriptions and information, regional dredging teams and other partnerships

  13. Managing Ocean Dumping in EPA Region 1

    Science.gov (United States)

    Overview of ocean dumping in New England, US. Includes materials dumped in the Region, ocean dumping permits issues, dredged material testing guidance, ocean disposal site descriptions and information, regional dredging teams and other partnerships.

  14. Managing Ocean Dumping in EPA Region 4

    Science.gov (United States)

    Overview of ocean dumping in Southeast United States. Includes materials dumped in the Region, ocean dumping permits issues, dredged material testing guidance, ocean disposal site descriptions and information, regional dredging teams and other partnerships

  15. Managing Ocean Dumping in EPA Region 3

    Science.gov (United States)

    Overview of ocean dumping in Mid Atlantic, US. Includes materials dumped in the Region, ocean dumping permits issues, dredged material testing guidance, ocean disposal site descriptions and information, regional dredging teams and other partnerships.

  16. Managing Ocean Dumping in EPA Region 2

    Science.gov (United States)

    Overview of ocean dumping in NY, NJ and Puerto Rico. Includes materials dumped in the Region, ocean dumping permits issues, dredged material testing guidance, ocean disposal site descriptions and information, regional dredging teams and other partnerships

  17. Dumping in a Global World

    NARCIS (Netherlands)

    J.L. Moraga-Gonzalez (José Luis); J.M.A. Viaene (Jean-Marie)

    2004-01-01

    textabstractAnti-dumping actions are now the trade policy of choice of developing and transition economies. To understand why these economies have increasingly applied anti-dumping laws, we build a simple theoretical model of vertical intra-industry trade and investigate the strategic incentives of

  18. Dumping at Sea Act 1974

    International Nuclear Information System (INIS)

    1974-01-01

    This Act enables the United Kingdom Government to ratify both the Oslo Convention of 1972 for the Prevention of Marine Pollution by Dumping from Ships and Aircraft and the London Convention of 1972 on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter. (NEA) [fr

  19. Non-Linear Beam Transport System for the LENS 7 MeV Proton Beam

    CERN Document Server

    Jones, William P; Derenchuk, Vladimir Peter; Rinckel, Thomas; Solberg, Keith

    2005-01-01

    A beam transport system has been designed to carry a high-intensity low-emittance proton beam from the exit of the RFQ-DTL acceleration system of the Indiana University Low Energy Neutron System (LENS)* to the neutron production target. The goal of the design was to provide a beam of uniform density over a 3cm by 3cm area at the target. Two octupole magnets** are employed in the beam line to provide the necessary beam phase space manipulations to achieve this goal. First order calculations were done using TRANSPORT and second order calculations have been performed using TURTLE. Second order simulations have been done using both a Gaussian beam distribution and a particle set generated by calculations of beam transport through the RFQ-DTL using PARMILA. Comparison of the design characteristics with initial measurements from the LENS commissioning process will be made.

  20. Studies on the beam system for the calibration of the OPAL jet chamber with laser beams

    International Nuclear Information System (INIS)

    Maringer, G.

    1988-07-01

    UV laser beams are an important tool for the calibration of the OPAL jet chamber. A beam transport system containing about 350 mirrors in total guides the beams from the laser outside the detector into the chamber. Four of the mirrors are moveable under remote control allowing to guide the beams into each of the 24 sectors and to correct the beam path in case of deviations. A program to control these moveable mirrors has been developed. Drift velocity measurements will be performed by means of double beams which are generated by appropriate beamsplitters. Accurate knowledge of the double beam distances is essential to obtain the desired accuracy of better than 0.1% or 10 μm. Using a CCD device with a pixel size of 23x23 μm 2 the beam distance could be measured with errors below the required limit. (orig.)

  1. A beam position feedback system for beam lines at the photon factory

    International Nuclear Information System (INIS)

    Katsura, T.; Kamiya, Y.; Haga, K.; Mitsuhashi, T.

    1987-01-01

    The beam position of the synchrotron radiation produced from the Storage Ring was stabilized by a twofold position feedback system. A digital feedback system was developed to suppress the diurnal beam movement (one cycle of sin-like drifting motion per day) which became a serious problem in low-emittance operation. The feedback was applied to the closed-orbit-distortion (COD) correction system in order to cancel the position variation at all the beam lines proportionately to the variation monitored at one beam line. An analog feedback system is also used to suppress frequency components faster than the slow diurnal movement

  2. Beam-Forming Concentrating Solar Thermal Array Power Systems

    Science.gov (United States)

    Cwik, Thomas A. (Inventor); Dimotakis, Paul E. (Inventor); Hoppe, Daniel J. (Inventor)

    2016-01-01

    The present invention relates to concentrating solar-power systems and, more particularly, beam-forming concentrating solar thermal array power systems. A solar thermal array power system is provided, including a plurality of solar concentrators arranged in pods. Each solar concentrator includes a solar collector, one or more beam-forming elements, and one or more beam-steering elements. The solar collector is dimensioned to collect and divert incoming rays of sunlight. The beam-forming elements intercept the diverted rays of sunlight, and are shaped to concentrate the rays of sunlight into a beam. The steering elements are shaped, dimensioned, positioned, and/or oriented to deflect the beam toward a beam output path. The beams from the concentrators are converted to heat at a receiver, and the heat may be temporarily stored or directly used to generate electricity.

  3. The neutron beam users tape management system

    International Nuclear Information System (INIS)

    Lyall, B.; Johnson, M.W.

    1977-02-01

    Systems are described for dealing with data collected at the High Flux Reactor, Institut Laue-Langevin, Grenoble and brought on magnetic tape to the Neutron Beam Research Unit at the Rutherford Laboratory. The first system, named GNAT, was designed to archive the incoming 800 bpi tapes onto 6250 bpi tapes (to enable them to return to the ILL). The archiving program, besides choosing the archive tapes, keeping a record of the data sets archived, and writing the archive tape, should be able to cope with incoming tapes whose formats are somewhat different from the standard IBM format. The second system, named FONT, was designed to maintain a record of all the tapes in the NBRU's possession, their whereabouts and what data, if any, are on them. (U.K.)

  4. Beam characterisation of the KIRAMS electron microbeam system

    International Nuclear Information System (INIS)

    Sun, G. M.; Kim, E. H.; Song, K. B.; Jang, M.

    2006-01-01

    An electron microbeam system has been installed at the Korea Inst. of Radiological and Medical Sciences (KIRAMS) for use in radiation biology studies. The electron beam is produced from a commercial electron gun, and the beam size is defined by a 5 μm diameter pinhole. Beam energy can be varied in the range of 1-100 keV, covering a range of linear energy transfer from 0.4 to 12.1 keV μm -1 . The micrometer-sized electron beam selectively irradiates cells cultured in a Mylar-bottomed dish. The positioning of target cells one by one onto the beam exit is automated, as is beam shooting. The electron beam entering the target cells has been calibrated using a Passivated Implanted Planar Silicon (PIPS) detector. This paper describes the KIRAMS microbeam cell irradiation system and its beam characteristics. (authors)

  5. New data acquisition system for beam loss monitor used in J-PARC main ring

    Science.gov (United States)

    Satou, K.; Toyama, T.; Kamikubota, N.; Yoshida, S.; Matsushita, J.; Wakita, T.; Sugiyama, M.; Morino, T.

    2018-04-01

    A new data acquisition system has been developed continually as a part of the development of a new beam loss monitor (BLM) system for the J-PARC main ring. This development includes a newly designed front-end isolation amp that uses photo-couplers and a VME-based new analog-to-digital converter (ADC) system. Compared to the old amp, the new amp has a 10 times higher conversion impedance for the input current to the output voltage; this value is 1 M Ω. Moreover, the bandwidth was improved to from DC to 50 kHz, which is about two orders of magnitude greater than the previously used bandwidth. The theoretical estimations made in this study roughly agree with the frequency response obtained for the new system. The new ADC system uses an on-board field-programmable gate array chip for signal processing. By replacing the firmware of this chip, changes pertaining to future accelerator upgrade plans may be introduced into the new ADC system; in addition, the ADC system can be used in other applications. The sampling speed of the system is 1 MS/s, and it exhibits a 95 dBc spurious-free dynamic range and 16.5 effective number of bits. The obtained waveform and integrated charge data are compared with two reference levels in the ADC system. If the data exceeds the reference level, the system generates an alarm to dump the beams. By using the new data acquisition system, it was proved that the new BLM system shows a wide dynamic range of 160 dB. In this study, the details of the new data acquisition system are described.

  6. A GIS-based zoning of illegal dumping potential for efficient surveillance.

    Science.gov (United States)

    Tasaki, Tomohiro; Kawahata, Takatsune; Osako, Masahiro; Matsui, Yasuhiro; Takagishi, Susumu; Morita, Akihiro; Akishima, Shigeki

    2007-01-01

    To assist in the efficient surveillance against illegal dumping, this study examined and evaluated two methods to illustrate the illegal dumping potential of sites using GIS (Geographic Information System) data. One approach focused on the occurrence of illegal dumping sites; the other on the size of the illegal dumping. Both approaches to zoning were implemented for the Kanto region of Japan, utilizing seven or eight major geographical attributes most closely related to illegal dumping. The zoning results revealed the areas requiring patrols against illegal dumping. Evaluation of the zoning results using the ROC (Receiver Operating Characteristic) curve showed the number of illegal dumping sites detectable under certain surveillance conditions and that the size-based zoning was superior, but this superiority was insignificant for revealing sites with higher potential for large illegal dumping, for which it would be sufficient to use the occurrence-based zoning. The evaluation also showed the contribution of each geographical attribute. Finally, application of the ROC curve to the surveillance planning process was examined, which enables the total social cost of pollution by illegal dumping, rehabilitation of dumping sites, and illegal dumping surveillance to be minimized.

  7. Characterizing the Dynamic Response of a Chassis Frame in a Heavy-Duty Dump Vehicle Based on an Improved Stochastic System Identification

    Directory of Open Access Journals (Sweden)

    Zhi Chen

    2015-01-01

    Full Text Available This paper presents an online method for the assessment of the dynamic performance of the chassis frame in a heavy-duty dump truck based on a novel stochastic subspace identification (SSI method. It introduces the use of an average correlation signal as the input data to conventional SSI methods in order to reduce the noisy and nonstationary contents in the vibration signals from the frame, allowing accurate modal properties to be attained for realistically assessing the dynamic behaviour of the frame when the vehicle travels on both bumped and unpaved roads under different operating conditions. The modal results show that the modal properties obtained online are significantly different from the offline ones in that the identifiable modes are less because of the integration of different vehicle systems onto the frame. Moreover, the modal shapes between 7 Hz and 40 Hz clearly indicate the weak section of the structure where earlier fatigues and unsafe operations may occur due to the high relative changes in the modal shapes. In addition, the loaded operations show more modes which cause high deformation on the weak section. These results have verified the performance of the proposed SSI method and provide reliable references for optimizing the construction of the frame.

  8. Nonlinear wave-beam kinetic equilibrium in decelerating systems

    International Nuclear Information System (INIS)

    Grishin, V.K.; Shaposhnikova, E.N.

    1981-01-01

    The equilibrium state of the wave-beam system arising during the interaction of a particle beam and excited electromagnetic wave has been investigated on the basis of the analysis of the exact polution of a non-linear self-consistent linear equation using the complete system of conservation laws. A waveguide with a dielectric filler, into which a monoenergetic particle beam magnetized in a transverse plane is continuously injected, is used as a model of an decelerating system. A dispersion equation describing the system state and expression for the evaluation of efficiency of the beam energy conversion to the field energy have been obtained. It is concluded that larae fields and high efficiency of energy conversion are achieved during the marked beam reconstruction. States with different values of current and beam velocity but similar amplitudes of a longitudinal field are possible in the system considered [ru

  9. An elementary presentation of the PS ''beam control'' system

    International Nuclear Information System (INIS)

    Boussard, D.

    1973-01-01

    The PS synchrotron control system is explained in general terms, covering the topics of frequency control, beam transfer, damping, stability, conservation of longitudinal emittance, and second order problems

  10. The new 0.5 ohm, 60 kA beam dumping system under test in the laboratory

    CERN Multimedia

    1974-01-01

    In the foreground are the four ultra-high-vacuum tanks which house the deflection structure. In the background are the thirty 15 ohm high-voltage cables that connect the six pulse-forming networks to the spark gap and to the UHV tanks.

  11. TRANSIENT BEAM LOADING EFFECTS IN RF SYSTEMS IN JLEIC

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Haipeng [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Guo, Jiquan [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Rimmer, Robert A. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Wang, Shaoheng [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2016-05-01

    The pulsed electron bunch trains generated from the Continuous Electron Beam Accelerator Facility (CEBAF) linac to inject into the proposed Jefferson Lab Electron Ion Collider (JLEIC) e-ring will produce transient beam loading effects in the Superconducting Radio Frequency (SRF) systems that, if not mitigated, could cause unacceptably large beam energy deviation in the injection capture, or exceed the energy acceptance of CEBAF’s recirculating arcs. In the electron storage ring, the beam abort or ion clearing gaps or uneven bucket filling can cause large beam phase transients in the (S)RF cavity control systems and even beam loss due to Robinson instability. We have first analysed the beam stability criteria in steady state and estimated the transient effect in Feedforward and Feedback RF controls. Initial analytical models for these effects are shown for the design of the JLEIC e-ring from 3GeV to 12GeV.

  12. Development of a focused ion beam micromachining system

    Energy Technology Data Exchange (ETDEWEB)

    Pellerin, J.G.; Griffis, D.; Russell, P.E.

    1988-12-01

    Focused ion beams are currently being investigated for many submicron fabrication and analytical purposes. An FIB micromachining system consisting of a UHV vacuum system, a liquid metal ion gun, and a control and data acquisition computer has been constructed. This system is being used to develop nanofabrication and nanomachining techniques involving focused ion beams and scanning tunneling microscopes.

  13. High precision electron beam diagnostic system for high current long pulse beams

    International Nuclear Information System (INIS)

    Chen, Y J; Fessenden, T; Holmes, C; Nelson, S D; Selchow, N.

    1999-01-01

    As part of the effort to develop a multi-axis electron beam transport system using stripline kicker technology for DARHT II applications, it is necessary to precisely determine the position and extent of long high energy beams (6-40 MeV, 1-4 kA, 2 microseconds) for accurate position control. The kicker positioning system utilizes shot-to-shot adjustments for reduction of relatively slow (<20 MHz) motion of the beam centroid. The electron beams passing through the diagnostic systems have the potential for large halo effects that tend to corrupt measurements performed using capacitive pick-off probes. Likewise, transmission line traveling wave probes have problems with multi-bounce effects due to these longer pulse widths. Finally, the high energy densities experienced in these applications distort typical foil beam position measurements

  14. Multi-electron beam system for high resolution electron beam induced deposition

    NARCIS (Netherlands)

    Van Bruggen, M.J.

    2008-01-01

    The development of a multi-electron beam system is described which is dedicated for electron beam induced deposition (EBID) with sub-10 nm resolution. EBID is a promising mask-less nanolithography technique which has the potential to become a viable technique for the fabrication of 20-2 nm

  15. Design of a negative ion neutral beam system for TNS

    International Nuclear Information System (INIS)

    Easoz, J.R.

    1978-05-01

    A conceptual design of a neutral beam line based on the neutralization of negative deuterium ions is presented. This work is a detailed design of a complete neutral beam line based on using negative ions from a direct extraction source. Anticipating major technological advancements, beam line components have been scaled including the negative ion sources and components for the direct energy recovery of charged beams and high speed cryogenic pumping. With application to the next step in experimental fusion reactors (TNS), the neutral beam injector system that has been designed provides 10 MW of 200 keV neutral deuterium atoms. Several arms are required for plasma ignition

  16. Beam current control system for a high-voltage accelerator

    International Nuclear Information System (INIS)

    Razin, G.I.; Val'tman, D.S.; Timofeev, V.E.

    1979-01-01

    A flowsheet of the beam current control system for commercial accelerators is given. Setting and stabilization of a given beam current value are accomplished by the automatic change of a current of a diode electron gun heater or potential of a qrid of three-electrode gun. Beam current coming to an electron-optical converter generates a control signal supplying electron gun. The system operates in the beam current stabilization regime as well as in the radiation dose stabilization regime. The system response amounts to [ru

  17. Double deflection system for an electron beam device

    International Nuclear Information System (INIS)

    Parker, N.W.; Crewe, A.V.

    1978-01-01

    A double deflection scanning system for electron beam instruments is provided embodying a means of correcting isotropic coma, and anisotropic coma aberrations induced by the magnetic lens of such an instrument. The scanning system deflects the beam prior to entry into the magnetic lens from the normal on-axis intersection of the beam with the lens according to predetermined formulas and thereby reduces the aberrations

  18. Experimental study on beam for composite CES structural system

    Science.gov (United States)

    Matsui, Tomoya

    2017-10-01

    Development study on Concrete Encase Steel (CES) composite structure system has been continuously conducted toward the practical use. CES structure is composed of steel and fiber reinforced concrete. In previous study, it was found that CES structure has good seismic performance from experimental study of columns, beam - column joints, shear walls and a two story two span frame. However, as fundamental study on CES beam could be lacking, it is necessary to understand the structural performance of CES beam. In this study, static loading tests of CES beams were conducted with experimental valuable of steel size, the presence or absence of slab and thickness of slab. And restoring characteristics, failure behavior, deformation behavior, and strength evaluation method of CES beam were investigated. As the results, it was found that CES beam showed stable hysteresis behavior. Furthermore it was found that the flexural strength of the CES beam could be evaluated by superposition strength theory.

  19. The SPL-based Neutrino Super Beam

    CERN Document Server

    Baussan, E; Bobeth, C; Bouquerel, E; Caretta, O; Cupial, P; Davenne, T; Densham, C; Dracos, M; Fitton, M; Gaudiot, G; Kozien, M; Lacny, L; Lepers, B; Longhin, A; Loveridge, P; Osswald, F; Poussot, P; Rooney, M; Skoczen, B; Szybinski, B; Ustrzycka, A; Vassilopoulos, N; Wilcox, D; Wroblewski, A; Wurtz, J; Zeter, V; Zito, M

    2012-01-01

    The EUROnu Super Beam work package has studied a neutrino beam based on SPL at CERN and aimed at MEMPHYS, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane (Fr\\'ejus tunnel, France), with a baseline of 130 km. The aim of this proposed experiment is to study the CP violation in the neutrino sector. In the study reported here, we have developed the conceptual design of the neutrino beam, especially the target and the magnetic focusing device. Indeed, this beam present several unprecedented challenges, like the high primary proton beam power (4 MW), the high repetition rate (50 Hz) and the low energy of the protons (4.5 GeV). The design is completed by a study of all the main component of the system, starting from the transport system to guide the beam to the target up to the beam dump.

  20. Beam transport design for a recirculating-linac FEL driver

    International Nuclear Information System (INIS)

    Neuffer, D.; Douglas, D.; Li, Z.; Cornacchia, M.; Garren, A.

    1996-01-01

    The beam transport system for the CEBAF Industrial FEL includes a two-pass transport of the beam with acceleration from injector to wiggler, followed by energy recovery transport from wiggler to dump. From that context, the authors discuss the general problem of multi-pass energy-recovery beam transport for FELs. Tunable, nearly-isochronous, large-momentum-acceptance transport systems are required. The entire transport must preserve beam quality, particularly in the acceleration transport to the wiggler, and have low losses throughout the entire system. Various possible designs are presented, and results of dynamic analyses are discussed

  1. Data acquisition system for medium power neutral beam test facility

    International Nuclear Information System (INIS)

    Stewart, C.R. Jr.; Francis, J.E. Jr.; Hammons, C.E.; Dagenhart, W.K.

    1978-06-01

    The Medium Power Neutral Beam Test Facility at Oak Ridge National Laboratory was constructed in order to develop, test, and condition powerful neutral beam lines for the Princeton Large Torus experiment at Princeton Plasma Physics Laboratory. The data acquisition system for the test stand monitors source performance, beam characteristics, and power deposition profiles to determine if the beam line is operating up to its design specifications. The speed of the computer system is utilized to provide near-real-time analysis of experimental data. Analysis of the data is presented as numerical tabulation and graphic display

  2. Data acquisition system for PLT Neutral Beam Test Stand

    International Nuclear Information System (INIS)

    Francis, J.E. Jr.; Hammons, C.E.

    1977-01-01

    The PLT Neutral Beam Test Stand at Oak Ridge National Laboratory was constructed to test and condition powerful neutral beam sources for the Princeton Large Torus experiment at Princeton Plasma Physics Laboratory. The data acquisition system for the test stand monitors the beam characteristics and power output to determine if the beam is operating at its design specifications. The high speed of the computer system is utilized to provide near-real-time analysis of experimental data. The analysis of the data is presented as numerical tabulation and graphic display

  3. Neutral particle beam intensity controller

    Science.gov (United States)

    Dagenhart, W.K.

    1984-05-29

    The neutral beam intensity controller is based on selected magnetic defocusing of the ion beam prior to neutralization. The defocused portion of the beam is dumped onto a beam dump disposed perpendicular to the beam axis. Selective defocusing is accomplished by means of a magnetic field generator disposed about the neutralizer so that the field is transverse to the beam axis. The magnetic field intensity is varied to provide the selected partial beam defocusing of the ions prior to neutralization. The desired focused neutral beam portion passes along the beam path through a defining aperture in the beam dump, thereby controlling the desired fraction of neutral particles transmitted to a utilization device without altering the kinetic energy level of the desired neutral particle fraction. By proper selection of the magnetic field intensity, virtually zero through 100% intensity control of the neutral beam is achieved.

  4. Collected abstracts on particle beam diagnostic systems

    International Nuclear Information System (INIS)

    Hickok, R.L.

    1979-01-01

    This report contains a compilation of abstracts on work related to particle beam diagnostics for high temperature plasmas. The abstracts were gathered in early 1978 and represent the status of the various programs as of that date. It is not suggested that this is a comprehensive list of all the work that is going on in the development of particle beam diagnostics, but it does provide a representative view of the work in this field. For example, no abstracts were received from the U.S.S.R. even though they have considerable activity in particle beam diagnostics

  5. Engineering aspects of particle beam fusion systems

    International Nuclear Information System (INIS)

    Cook, D.L.

    1982-01-01

    The Department of Energy is supporting research directed toward demonstration of DT fuel ignition in an Inertial Confinement Fusion (ICF) capsule. As part of the ICF effort, two major Particle Beam Fusion Accelerators (PBFA I and II) are being developed at Sandia National Laboratories with the objective of providing energetic light ion beams of sufficient power density for target implosion. Supporting light ion beam research is being performed at the Naval Research Laboratory and at Cornell University. If the answers to several key physics and engineering questions are favorable, pulsed power accelerators will be able to provide an efficient and inexpensive approach to high target gain and eventual power production applications

  6. LHC Report: Beam on

    CERN Multimedia

    Rossano Giachino for the LHC Team

    2012-01-01

    The powering tests described in the last edition of the Bulletin were successfully finished at the end of the first week of March opening the way for 4 TeV operations this year. The beam was back in the machine on Wednesday 14 March. The first collisions at 4 TeV are scheduled for the first week of April.   The first beam of 2012 is dumped after making a few rounds in the LHC. The magnet powering tests were followed by the machine checkout phase. Here the operations team in collaboration with the equipment groups performs a sequence of tests to ensure the readiness of the LHC for beam. The tests include driving all the LHC systemsbeam dump, injection, collimation, RF, power converters, magnet circuits, vacuum, interlocks, controls, timing and synchronization – through the operational cycle. The “checkout phase” is really a massive de-bugging exercise, which is performed with the objective of ensuring the proper functioning of the whole machine and t...

  7. Dump Truck Stability During Unloading

    Directory of Open Access Journals (Sweden)

    Yu. N. Baryshnikov

    2015-01-01

    Full Text Available The article deals with the problem of stability of the truck while unloading. The main symptom is a loss of stability of a vehicle rollover. The most common vehicle rollover occurs when unloading on sloped sites. The unloading area can be both longitudinal and cross slope. In this regard, the main task of the calculation is to determine the stability of the car the maximum allowable angle of discharge site and loads acting on the bearing system of the car.The paper presents a developed mathematical model of the truck when unloading on the longitudinal slope. It also offers the procedure of the step change in the parameters for the calculation of the critical angle of the site. The formulas for calculating the force interaction platform and the support system in the truck unloading at the site with a longitudinal slope are given. On the basis of the developed technique, a program for calculating longitudinal stability and loads acting on the bearing system dump trucks is created.Modern methods to assess stability while unloading the truck on a cross slope are analyzed. It is noted that the solution of this problem is developing in two directions. The first approach involves the testing truck samples on the special stands. Examples of bench tests on the stability of trucks are given. Another approach uses computational methods for the study. However, this requires the creation of a complex mathematical model of the truck, which should take into account the structural features of the suspension, the nonlinear elastic suspension components and tires, as well as the possibility of plastic deformation of the support system in torsion. In this formulation, the problem can only be solved using numerical methods and may be the subject of further research.The proposed approach allows multiple calculations for truck strength and stability already at an early designing stage in order to find the optimal design solution.

  8. A system for online beam emittance measurements and proton beam characterization

    Science.gov (United States)

    Nesteruk, K. P.; Auger, M.; Braccini, S.; Carzaniga, T. S.; Ereditato, A.; Scampoli, P.

    2018-01-01

    A system for online measurement of the transverse beam emittance was developed. It is named 4PrOBεaM (4-Profiler Online Beam Emittance Measurement) and was conceived to measure the emittance in a fast and efficient way using the multiple beam profiler method. The core of the system is constituted by four consecutive UniBEaM profilers, which are based on silica fibers passing across the beam. The 4PrOBεaM system was deployed for characterization studies of the 18 MeV proton beam produced by the IBA Cyclone 18 MeV cyclotron at Bern University Hospital (Inselspital). The machine serves daily radioisotope production and multi-disciplinary research, which is carried out with a specifically conceived Beam Transport Line (BTL). The transverse RMS beam emittance of the cyclotron was measured as a function of several machine parameters, such as the magnetic field, RF peak voltage, and azimuthal angle of the stripper. The beam emittance was also measured using the method based on the quadrupole strength variation. The results obtained with both techniques were compared and a good agreement was found. In order to characterize the longitudinal dynamics, the proton energy distribution was measured. For this purpose, a method was developed based on aluminum absorbers of different thicknesses, a UniBEaM detector, and a Faraday cup. The results were an input for a simulation of the BTL developed in the MAD-X software. This tool allows machine parameters to be tuned online and the beam characteristics to be optimized for specific applications.

  9. A beam energy measurement system at NIRS-930 cyclotron

    International Nuclear Information System (INIS)

    Hojo, S.; Honma, T.; Sakamoto, Y.; Miyahara, N.; Okada, T.; Komatsu, K.; Tsuji, N.; Yamada, S.

    2005-01-01

    A beam energy measurement system employing a set of capacitive probes has been developed at NIRS-930 cyclotron. Principle of the measurement is applying a modified-TOF method, so that the two proves are installed at one of the straight section in the beam transport line. Usually they are separated about 5.8 m, which is equivalent to the almost final path length of the beam extracted in the cyclotron. In the measurement, two beam signals are superimposed by adjusting a position of the downstream-probe along the beam direction with watching an oscilloscope screen roughly. In order to determine the beam energy accurately the signals are processed by MCA with suitable electric module. (author)

  10. Wave Propagation in an Ion Beam-Plasma System

    DEFF Research Database (Denmark)

    Jensen, T. D.; Michelsen, Poul; Juul Rasmussen, Jens

    1979-01-01

    The spatial evolution of a velocity- or density-modulated ion beam is calculated for stable and unstable ion beam plasma systems, using the linearized Vlasov-Poisson equations. The propagation properties are found to be strongly dependent on the form of modulation. In the case of velocity...

  11. Chemical munitions dumped at sea

    Science.gov (United States)

    Edwards, Margo; Bełdowski, Jacek

    2016-06-01

    Modern chemical warfare is a byproduct of the industrial revolution, which created factories capable of rapidly producing artillery shells that could be filled with toxic chemicals such as chlorine, phosgene and mustard agent. The trench warfare of World War I inaugurated extensive deployments of modern chemical weapons in 1915. Concomitantly, the need arose to dispose of damaged, captured or excess chemical munitions and their constituents. Whereas today chemical warfare agents (CWA) are destroyed via chemical neutralization processes or high-temperature incineration in tandem with environmental monitoring, in the early to middle 20th century the options for CWA disposal were limited to open-air burning, burial and disposal at sea. The latter option was identified as the least likely of the three to impact mankind, and sea dumping of chemical munitions commenced. Eventually, the potential impacts of sea dumping human waste were recognized, and in 1972 an international treaty, the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter, was developed to protect the marine environment from pollution caused by the dumping of wastes and other matter into the ocean. By the time this treaty, referred to as the London Convention, was signed by a majority of nations, millions of tons of munitions were known to have been disposed throughout the world's oceans.

  12. Down in the dumps - cheerfully

    International Nuclear Information System (INIS)

    Ruhmer, W.T.

    1984-01-01

    Scavenging gold and uranium from the sands dumps and slimes dams is a highly profitable operation. In a few pages the author summarises some of the permutations and combinations of the various processes employed by South African concerns to achieve economic results

  13. Egg dumping by predatory insects

    Czech Academy of Sciences Publication Activity Database

    Corbani, A. C.; Ferrer, A.; Dixon, Anthony F. G.; Hemptinne, J. L.

    2011-01-01

    Roč. 36, č. 3 (2011), s. 290-293 ISSN 0307-6962 Institutional research plan: CEZ:AV0Z60870520 Keywords : Egg dumping * ladybird beetles * oocyte resorption * trophic egg Subject RIV: EH - Ecology, Behaviour Impact factor: 1.330, year: 2011

  14. Beam Position and Phase Monitor - Wire Mapping System

    Energy Technology Data Exchange (ETDEWEB)

    Watkins, Heath A [Los Alamos National Laboratory; Shurter, Robert B. [Los Alamos National Laboratory; Gilpatrick, John D. [Los Alamos National Laboratory; Kutac, Vincent G. [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory

    2012-04-10

    The Los Alamos Neutron Science Center (LANSCE) deploys many cylindrical beam position and phase monitors (BPPM) throughout the linac to measure the beam central position, phase and bunched-beam current. Each monitor is calibrated and qualified prior to installation to insure it meets LANSCE requirements. The BPPM wire mapping system is used to map the BPPM electrode offset, sensitivity and higher order coefficients. This system uses a three-axis motion table to position the wire antenna structure within the cavity, simulating the beam excitation of a BPPM at a fundamental frequency of 201.25 MHz. RF signal strength is measured and recorded for the four electrodes as the antenna position is updated. An effort is underway to extend the systems service to the LANSCE facility by replacing obsolete electronic hardware and taking advantage of software enhancements. This paper describes the upgraded wire positioning system's new hardware and software capabilities including its revised antenna structure, motion control interface, RF measurement equipment and Labview software upgrades. The main purpose of the wire mapping system at LANSCE is to characterize the amplitude response versus beam central position of BPPMs before they are installed in the beam line. The wire mapping system is able to simulate a beam using a thin wire and measure the signal response as the wire position is varied within the BPPM aperture.

  15. Lithium beam diagnostic system on the COMPASS tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Anda, G.; Bencze, A. [Wigner – RCP, HAS, Budapest (Hungary); Berta, M., E-mail: bertam@sze.hu [Institute of Plasma Physics AS CR, Prague (Czech Republic); Széchenyi István University, Győr (Hungary); Dunai, D. [Wigner – RCP, HAS, Budapest (Hungary); Hacek, P. [Institute of Plasma Physics AS CR, Prague (Czech Republic); Faculty of Mathematics and Physics, Charles University in Prague, Prague (Czech Republic); Krbec, J. [Institute of Plasma Physics AS CR, Prague (Czech Republic); Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University in Prague, Prague (Czech Republic); Réfy, D.; Krizsanóczi, T.; Bató, S.; Ilkei, T.; Kiss, I.G.; Veres, G.; Zoletnik, S. [Wigner – RCP, HAS, Budapest (Hungary)

    2016-10-15

    Highlights: • Li-beam diagnostic system on the COMPASS tokamak is an improved and compact system to allow testing of Atomic Beam Probe. • The possibility to measure background corrected density profiles on the few microseconds time scale. • First Li-beam diagnostic system with recirculating neutralizer. • The system includes the redesigned ion source with longer lifetime. - Abstract: An improved lithium beam based beam emission spectroscopy system – installed on COMPASS tokamak – is described. The beam energy enhanced up to 120 keV for Atomic Beam Probe measurement. The size of the ion source is doubled, using a newly developed thermionic heater instead of the conventionally used heating (tungsten or molybdenum) filament. The neutralizer is also improved. It produces the same sodium vapor in a cell but minimize the loss condensing the vapor on a cold surface which is led back (in fluid state) into the sodium oven. This way we call it recirculating neutralizer. The observation system consists of a CCD camera and an avalanche photodiode array.

  16. 30 CFR 77.1608 - Dumping facilities.

    Science.gov (United States)

    2010-07-01

    ... weight of a loaded dump truck, trucks shall be dumped a safe distance back from the edge of the bank. (c... material. (d) Grizzlies, grates, and other sizing devices at dump and transfer points shall be anchored securely in place. (e) If truck spotters are used, they shall be well in the clear while trucks are backing...

  17. Alternative power supply and dump resistor connections for similar, mutally coupled, superconducting coils

    International Nuclear Information System (INIS)

    Owen, E.W.; Shimer, D.W.; Wang, S.T.

    1983-01-01

    Alternative methods of connecting similar mutually coupled coils to their power supplies and dump resistors are investigated. The circuits are evaluated for both operating and fault conditions. The factors considered are the voltage to ground during a dump, short circuits, open circuits, quenches, and failure of the protection system to detect a quench. Of particular interest are the currents induced in coils that remain superconducting when one or more coils quench. The alternative connections include combined power supplies, individual dump resistors, combined resistors and series and parallel dump resistors. A new circuit that contains coupling resistors is proposed. The coupling resistors do not affect normal fast dumps but reduce the peak induced currents while also reducing the energy rating of the dump resistors. Another novel circuit, the series circuit with diodes, is discussed. The MFTF-B central-cell solenoids are used as an example

  18. Alternative power supply and dump resistor connections for similar, mutually coupled, superconducting coils

    International Nuclear Information System (INIS)

    Owen, E.W.; Shimer, W.; Wang, S.T.

    1983-01-01

    Alternative methods of connecting similar mutually coupled coils to their power supplies and dump resistors are investigated. The circuits are evaluated for both operating and fault conditions. The factors considered are the voltage to ground during a dump, short circuits, open circuits, quenches, and failure of the protection system to detect a quench. Of particular interest are the currents induced in coils that remain superconducting when one or more coils quench. The alternative connections include combined power supplies, individual dump resistors, combined resistors and series and parallel dump resistors. A new circuit that contains ''coupling'' resistors is proposed. The coupling resistors do not affect normal fast dumps but reduce the peak induced currents while also reducing the energy rating of the dump resistors. Another novel circuit, the series circuit with diodes, is discussed. The MFTF-B central-cell solenoids are used as an example

  19. Off-line system for particle beam diagnostics

    International Nuclear Information System (INIS)

    Basiladze, S.G.; Komolov, L.N.; Yudin, V.K.

    1979-01-01

    An off-line system in the CAMAC standard for beam diagnostics with the help of proportional chambers and the NTA-512B analyzer is described. The maximum number of wires in the system is 512. The accuracy of beam profile presentation is increased by selection of single-wire operations. The inquire time of one proportional chamber constitutes 15-20 μs and is comparable to the analyzer recording cycle. As a result, six chambers can detect 3000 particles per one accelerator cycle at the beam extraction duration of 400 ms. The system can be connected to a computer

  20. Measurement system with high accuracy for laser beam quality.

    Science.gov (United States)

    Ke, Yi; Zeng, Ciling; Xie, Peiyuan; Jiang, Qingshan; Liang, Ke; Yang, Zhenyu; Zhao, Ming

    2015-05-20

    Presently, most of the laser beam quality measurement system collimates the optical path manually with low efficiency and low repeatability. To solve these problems, this paper proposed a new collimated method to improve the reliability and accuracy of the measurement results. The system accuracy controlled the position of the mirror to change laser beam propagation direction, which can realize the beam perpendicularly incident to the photosurface of camera. The experiment results show that the proposed system has good repeatability and the measuring deviation of M2 factor is less than 0.6%.

  1. Neutral beam injection system design for KSTAR tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Choi, B.H.; Lee, K.W.; Chung, K.S.; Oh, B.H.; Cho, Y.S.; Bae, Y.D.; Han, J.M. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1998-06-01

    The NBI system for KSTAR (Korean Superconducting Tokamak Advanced Research) has been designed based on conventional positive ion beam technology. One beam line consists of three ion sources, three neutralizers, one bending magnet, and one drift tube. This system will deliver 8 MW deuterium beam to KSTAR plasma in normal operation to support the advanced experiments on heating, current drive and profile control. The key technical issues in this design were high power ion source(120 kV, 65 A), long pulse operation (300 seconds; world record is 30 sec), and beam rotation from vertical to horizontal direction. The suggested important R and D points on ion source and beam line components are also included. (author). 7 refs., 27 figs., 1 tab.

  2. Optical beam transport system at FEL-SUT

    CERN Document Server

    Nomaru, K; Yokoyama, M; Oda, F; Nakayama, A; Koike, H; Kuroda, H

    2000-01-01

    Kawasaki Heavy Industries Ltd. has installed an FEL beam transport system at the IR FEL Research Center of the Science University of Tokyo (FEL-SUT). This system transports the FEL output beam from the FEL machine room to the optical diagnostic room through a vacuum tube. The in-vacuum multi-mirror synchronized system operated from the FEL control room enables the operator to control the multiple mirrors simultaneously on or off axis of the FEL beam and to distribute the FEL output to one of the laboratories. The essential component of the transport system is the passive control optics that is composed of an elliptical and parabolic mirror couple. Once the control optics is aligned, a parallel FEL beam with a good pointing stability is obtained without any active operation to tune the optical system for different wavelengths.

  3. Experience with FreeStyle Libre Flash glucose monitoring system in management of refractory dumping syndrome in pregnancy shortly after bariatric surgery

    OpenAIRE

    Novodvorsky, Peter; Walkinshaw, Emma; Rahman, Waliur; Gordon, Valerie; Towse, Karen; Mitchell, Sarah; Selvarajah, Dinesh; Madhuvrata, Priya; Munir, Alia

    2017-01-01

    Bariatric surgery is an effective therapy for obesity but is associated with long-term complications such as dumping syndromes and nutritional deficiencies. We report a case of a 26-year-old caucasian female, with history of morbid obesity and gestational diabetes (GDM), who became pregnant 4 months after Roux-en-Y bypass surgery. She developed GDM during subsequent pregnancy, which was initially managed with metformin and insulin. Nocturnal hypoglycaemia causing sleep disturbance and daytime...

  4. Beam Dynamics and Pulse Duration Control During Final Beam Bunching in Driver System for Heavy Ion Inertial Fusion

    CERN Document Server

    Kikuchi, Takashi; Katayama, Takeshi; Kawata, Shigeo; Nakajima, Mitsuo; Someya, Tetsuo

    2005-01-01

    Beam dynamics is investigated by multi-particle simulations during a final beam bunching in a driver system for heavy ion inertial fusion (HIF). The longitudinal bunch compression causes the beam instability induced by the strong space charge effect. The multi-particle simulation can indicate the emittance growth due to the longitudinal bunch compression. Dependence in the beam pulse duration is also investigated for effective pellet implosion in HIF. Not only the spatial nonuniformity of the beam illumination, but also the errors of the beam pulse duration cause changes of implosion dynamics. The allowable regime of the beam pulse duration for the effective fusion output becomes narrow with decreasing the input beam energy. The voltage accuracy requirement at the beam velocity modulator is also estimated for the final beam bunching. It is estimated that the integrated voltage error is allowable as a few percent.

  5. Beam-plasma interaction in case of injection of the electron beam to the symmetrically open plasma system

    International Nuclear Information System (INIS)

    Opanasenko, A.V.; Romanyuk, L.I.

    1992-01-01

    A beam-plasma interaction at the entrance of the symmetrically open plasma system with an electron beam injected through it is investigated. An ignition of the plasma-beam discharge on waves of upper hybrid dispersion branch of a magnetoactive plasma is found in the plasma penetrating into the vacuum contrary to the beam. It is shown that the beam-plasma discharge is localized in the inhomogeneous penetrating plasma in the zone where only these waves exist. Regularities of the beam-plasma discharge ignition and manifestation are described. It is determined that the electron beam crossing the discharge zone leads to the strong energy relaxation of the beam. It is shown possible to control the beam-plasma discharge ignition by changing the potential of the electron beam collector. (author)

  6. LHC Report: Towards stable beams and collisions

    CERN Multimedia

    CERN Bulletin

    2011-01-01

    Over the past two weeks, the LHC re-commissioning with beam has continued at a brisk pace. The first collisions of 2011 were produced on 2 March, with stable beams and collisions for physics planned for the coming days. Low intensity beams with just a few bunches of particles were used to test the energy ramp to 3.5 TeV and the squeeze. The results were successful and, as a by-product, the first collisions of 2011 were recorded 2 March. One of the main activities carried out by the operation teams has been the careful set-up of the collimation system, and the injection and beam dump protection devices. The collimation system provides essential beam cleaning, preventing stray particles from impacting other elements of the machine, particularly the superconducting magnets. In addition to the collimation system, also the injection and beam dump protection devices perform a vital machine protection role, as they detect any beam that might be mis-directed during rare, but not totally unavoidable, hardware hiccups...

  7. LHC Beam Loss Monitoring System Verification Applications

    CERN Document Server

    Dehning, B; Zamantzas, C; Jackson, S

    2011-01-01

    The LHC Beam Loss Mon­i­tor­ing (BLM) sys­tem is one of the most com­plex in­stru­men­ta­tion sys­tems de­ployed in the LHC. In ad­di­tion to protecting the col­lid­er, the sys­tem also needs to pro­vide a means of di­ag­nos­ing ma­chine faults and de­liv­er a feed­back of loss­es to the control room as well as to sev­er­al sys­tems for their setup and analysis. It has to trans­mit and pro­cess sig­nals from al­most 4’000 mon­i­tors, and has near­ly 3 mil­lion con­fig­urable pa­ram­e­ters. The system was de­signed with re­li­a­bil­i­ty and avail­abil­i­ty in mind. The spec­i­fied op­er­a­tion and the fail-safe­ty stan­dards must be guar­an­teed for the sys­tem to per­form its func­tion in pre­vent­ing su­per­con­duc­tive mag­net de­struc­tion caused by par­ti­cle flux. Main­tain­ing the ex­pect­ed re­li­a­bil­i­ty re­quires ex­ten­sive test­ing and ver­i­fi­ca­tion. In this paper we re­port our most re­cent ad­di­t...

  8. Beam chopper development at LAMPF

    International Nuclear Information System (INIS)

    Hutson, R.L.; Cooke, D.W.; Heffner, R.H.; Schillaci, M.E.; Dodds, S.A.; Gist, G.A.

    1986-01-01

    In order to reduce pileup limitations on μSR data rates, a fast chopper for surface muon beams was built and tested at LAMPF. The system allowed one muon at a time to be stopped in a μSR sample in the following way: A surface beam from the LAMPF Stopped Muon Channel was focused through a crossed-field beam separator and onto a chopper slit. With the separator E and B fields adjusted properly, the beam could pass through the slit. The beam to the μSR sample was turned on or off (chopped) rapidly by switching the high voltage applied to the separator plates on or off within approximately 500 ns; with the E field off, the B field deflected the beam, dumping it near the slit. We demonstrated that, with improved electronics, we will be able to stop a single muon in a μSR sample as frequently as once every 20 μs and that data rates for the system can be a factor of five higher than is attainable with unchopped beams. The observed positron contamination of the beam was less than five percent, and the ratio of the muon rate with beam on to the rate with beam off was 1540

  9. Beam extraction control systems of the fast-cycling synchrotron

    International Nuclear Information System (INIS)

    Toumanian, A.; Zapolski, N.; Nickogosian, V.; Ananian, A.; Kazarian, A.; Khoetsian, M.; Agababian, A.; Matevosian, A.

    1992-01-01

    A compact system controlling the extraction of different beams (gamma, electron, synchrotron radiation) in single and simultaneous operation modes at high electromagnetic disturbances level based on using one computer of IBM PC/AT type is described. (author)

  10. Calculation of the beam injector steering system using Helmholtz coils

    International Nuclear Information System (INIS)

    Passaro, A.; Sircilli Neto, F.; Migliano, A.C.C.

    1991-03-01

    In this work, a preliminary evaluation of the beam injector steering system of the IEAv electron linac is presented. From the existing injector configuration and with the assumptions of monoenergetic beam (100 keV) and uniform magnetic field, two pairs of Helmholtz coils were calculated for the steering system. Excitations of 105 A.turn and 37 A.turn were determined for the first and second coils, respectively. (author)

  11. Beam Transfer Systems for the LAGUNA-LBNO Long Baseline Neutrino Beam from the CERN SPS

    CERN Document Server

    Goddard, B; Efthymiopoulos, I; Papaphilippou, Y; Parfenova, A

    2013-01-01

    For the Long Baseline neutrino facility under study at CERN (LAGUNA-LBNO) it is initially planned to extract a 400 GeV beam from the second long straight section in the SPS into the existing transfer channel TT20 leading to the North Area experimental zone, to a new target aligned with a far detector at a distance of 2300 km [1]. In a second phase a new High-Power Proton Synchrotron (HPPS) accelerator is proposed, to give a 2 MW beam at about 50 GeV on the same target. In this paper the required beam transfer systems are outlined, including the new sections of transfer line between the Superconducting Proton Linac (SPL), HP-PS and SPS, and from the SPS to the target, and also the injection and extraction systems in the long straight section of the HPPS. The feasibility of a 4 GeV H- injection system is discussed.

  12. Beam Tracking in Switched-Beam Antenna System for V2V Communication

    Directory of Open Access Journals (Sweden)

    Settawit Poochaya

    2016-01-01

    Full Text Available This paper presents the proposed switched beam antenna system for V2V communication including optimum antenna half power beamwidth determination in urban road environments. SQP optimization method is selected for the computation of optimum antenna half power beamwidth. In addition, beam tracking algorithm is applied to guarantee the best beam selection with maximum RSSI. The results present the success of the proposed system with the increasing of V2V performance metrics. Also, V2V data dissemination via the proposed system introduces the enhancement of V2V link in terms of RSSI, PER, BER, Tsafe, and Rsafe. The results indicate the improvement of V2V link reliability. Consequently, the road safety is improved.

  13. Optical manipulation with two beam traps in microfluidic polymer systems

    DEFF Research Database (Denmark)

    Khoury Arvelo, Maria; Matteucci, Marco; Sørensen, Kristian Tølbøl

    2015-01-01

    An optical trapping system with two opposing laser beams, also known as the optical stretcher, are naturally constructed inside a microfluidic lab-on-chip system. We present and compare two approaches to combine a simple microfluidic system with either waveguides directly written in the microflui......An optical trapping system with two opposing laser beams, also known as the optical stretcher, are naturally constructed inside a microfluidic lab-on-chip system. We present and compare two approaches to combine a simple microfluidic system with either waveguides directly written...... in the microfluidic chip or with optical fibers mounted in the chip....

  14. Beam propagation considerations in the Aurora laser system

    International Nuclear Information System (INIS)

    Rosoche, L.A.; Mc Leod, J.; Hanlon, J.A.

    1987-01-01

    Aurora is a high-power KrF laser system now being constructed for inertial confinement fusion (ICF) studies. It will use optical angular multiplexing and serial amplification by electron-beam-driven KrF amplifiers to deliver a stacked, multikilojoule 5-ns-duration laser pulse to ICF targets. The requirements of angular multiplexing KrF lasers at the multikilojoule level dictate path lengths on the order of 1 km. The inherent complicated path crossings produced by angular multiplexing and pulse stacking do not allow isolation of individual beam lines, so the optical quality of the long beam paths must be controlled. Propagation of the 248-nm light beams over long paths in air is affected by scattering, absorption thermal gradients and turbulence, beam alignment, and control and optical component figure errors

  15. Beam forming system modernization at the MMF linac proton injector

    CERN Document Server

    Derbilov, V I; Nikulin, E S; Frolov, O T

    2001-01-01

    The isolation improvements of the beam forming system (BFS) of the MMF linac proton injector ion source are reported. The mean beam current and,accordingly, BFS electrode heating were increased when the MMF linac has began to operate regularly in long beam sessions with 50 Hz pulse repetition rate. That is why the BFS electrode high-voltage isolation that was made previously as two consequently and rigidly glued solid cylinder insulators has lost mechanical and electric durability. The substitution of large (160 mm) diameter cylinder insulator for four small diameter (20 mm) tubular rods has improved vacuum conditions in the space of beam forming and has allowed to operate without failures when beam currents being up to 250 mA and extraction and focusing voltage being up to 25 and 40 kV respectively. Moreover,the construction provides the opportunity of electrode axial move. The insulators are free from electrode thermal expansion mechanical efforts in a transverse direction.

  16. Program for beam optical computation of axial symmetrical electrostatic systems

    International Nuclear Information System (INIS)

    Ke Jianlin; Wu Chunlei; Zhou Changgeng

    2012-01-01

    The beam optical computation of axial symmetrical electrostatic systems is very important in the design and test of low-energy accelerators such as Cock-Croft and Van de Graaf accelerators. In this paper, a program for the beam optical computation of these structures has been developed using transfer matrix method. The electrostatic field region is divided into several small intervals in the program, and then the beam envelope is calculated interval-to-interval from the axial potential distribution, which is calculated by other electromagnetic field simulation software such as Maxwell SV. Space charge effect is included so that the program can be used in the computation of intense beam, while nonlinear effect is beyond its ability. The program can be used in the calculation of beam optics in most complicated axial symmetrical electrostatic fields, and the computing time required is very short. (authors)

  17. Fast Dump of the ATLAS Toroids

    CERN Document Server

    Dudarev, A; Volpini, Giovanni; Dudarev, Alexey; Kate, Herman Ten

    2010-01-01

    The toroidal magnet system of the ATLAS Detector at CERN consists of a Barrel Toroid (BT) and two End Cap Toroids (ECT-A and ECT-C). Each toroid is built up from eight racetrack coils wound with an aluminum stabilized NbTi conductor and indirectly cooled by forced flow liquid helium. The three toroids operate in series at 20.5 kA with a total stored energy of 1.5 GJ. In order to verify the reliability and effectiveness of the quench protection system, series of fast dump tests have been performed first of the single toroids and finally of the entire toroidal magnet system. In this paper a model to simulate the fast dump of the ATLAS toroids in single mode operation and in full system configuration is presented. The model is validated through comparison with measured data extracted from the ramp-and-quench runs. The calculated energy dissipation in the various coils is in very good agreement (within 1-2\\%) with the enthalpy changes estimated from the temperature measurements of the different parts of the cold ...

  18. LHC Report: The beam is back at the LHC

    CERN Multimedia

    Reyes Alemany

    2015-01-01

    A series of sector beam tests paved the way for the start-up of the LHC in 2008 and 2009. These tests and the follow-up of the issues that arose were part of the process that led to a smooth start-up with beam.   Given this experience, sector tests were scheduled to take place several weeks before the 2015 start-up. On the weekend of 6-9 March, beam from the SPS was injected into both LHC injection regions, followed by a first pass through the downstream LHC sectors. For the clockwise LHC beam (called “beam 1”) this meant passing through ALICE and into Sector 2-3, while the anticlockwise beam (called “beam 2”) was threaded through LHCb and all the way from Point 8 to Point 6, where it was extracted by the beam dump kickers onto the beam dump block. The dry runs in the previous weeks were mainly targeted at preparation for the sector tests. The systems tested included: injection, timing, synchronisation and beam instrumentation. The beam interlock ...

  19. Ultrafast fiber beam delivery: system technology and industrial application

    Science.gov (United States)

    Funck, Max C.; Eilzer, Sebastian; Wedel, Björn

    2017-02-01

    Flexible beam delivery of high power pico- and femtosecond pulses offers great advantages in industrial applications. Complex free space beam delivery as found in robot or gantry systems can be replaced, laser safety and uptime increased and system integration in production environment simplified. Only recently fiber beam delivery has become available for ultrafast lasers while it has been an established standard for cw and pulsed laser sources for many years. Using special kinds of fiber that guide the laser beam mostly inside a hollow core, nonlinear effects and catastrophic damage that would arise in conventional glass fibers can be avoided. Today, ultrafast pulses with several 100 μJ and hundreds of MW can be transmitted in quasi single mode fashion with micro-structured hollow core fibers. During the last years we have developed a modular beam delivery system that suits industrial ultrafast lasers and can be integrated into existing processing machines. Micro-structured hollow core fibers inside the sealed laser light cable efficiently guide high-power laser pulses over distances of several meters with excellent beam quality, while power, pulse duration and polarization are maintained. We report on the technology required for fiber beam delivery of ultrafast laser pulses and discuss requirements for successful integration into industrial production as well as achievable performance under realistic operation and show examples of micromachining applications.

  20. Laser beam riding guided system principle and design research

    Science.gov (United States)

    Qu, Zhou; Jin, Yi; Xu, Zhou; Xing, Hao

    2016-01-01

    With the development of science and technology, precision-strike weapons has been considered to be important for winning victory in military field. Laser guidance is a major method to execute precision-strike in modern warfare. At present, the problems of primary stage of Laser guidance has been solved with endeavors of countries. Several technical aspects of laser-beam riding guided system have been mature, such as atmosphere penetration of laser beam, clutter inhibition on ground, laser irradiator, encoding and decoding of laser beam. Further, laser beam quality, equal output power and atmospheric transmission properties are qualified for warfare situation. Riding guidance instrument is a crucial element of Laser-beam riding guided system, and is also a vital element of airborne, vehicle-mounted and individual weapon. The optical system mainly consist of sighting module and laser-beam guided module. Photoelectric detector is the most important sensing device of seeker, and also the key to acquire the coordinate information of target space. Currently, in consideration of the 1.06 u m of wavelength applied in all the semi-active laser guided weapons systems, lithium drifting silicon photodiode which is sensitive to 1.06 u m of wavelength is used in photoelectric detector. Compared to Solid and gas laser, diode laser has many merits such as small volume, simple construction, light weight, long life, low lost and easy modulation. This article introduced the composition and operating principle of Laser-beam riding guided system based on 980 nm diode laser, and made a analysis of key technology; for instance, laser irradiator, modulating disk of component, laser zooming system. Through the use of laser diode, Laser-beam riding guided system is likely to have smaller shape and very light.

  1. Construction of the facility for the testing of the TFTR Neutral Beam Injector

    International Nuclear Information System (INIS)

    Haughian, J.; Lou, K.; Roth, D.

    1979-11-01

    The prototype for the TFTR Neutral Beam Injection System has been assembled at the Lawrence Berkeley Laboraory, and is presently under test. Some of the construction features of the shielding enclosure, the cryogenic supply system, control and computer area, and the auxiliary vacuum and utility supply system are described. In addition, the paper describes the target chamber, its beam dump and cryopanels, and the duct that connects the target chamber to the injector vessel

  2. Conceptual design of dump resistor for superconducting CS of SST-1

    International Nuclear Information System (INIS)

    Roy, Swati; Pradhan, Subrata; Panchal, Arun

    2015-01-01

    During the upgradation of SST-1, the resistive central solenoid (CS) coil has been planned to be replaced with Nb 3 Sn based superconducting coil. The superconducting CS will store upto 3.5MJ of magnetic energy per operation cycle with operating current upto 14kA. In case of coil quench, the energy stored in the coils is to be extracted rapidly with a time constant of 1.5s. This will be achieved by inserting a 20m Ohm dump resistor in series with the superconducting CS which is normally shorted by circuit breakers. As a vital part of the superconducting CS quench protection system, a conceptual design of the 20m Ohm dump resistor has been proposed. In this paper, the required design aspects and a dimensional layout of the dump resistor for the new superconducting CS has been presented. Natural air circulation is proposed as cooling method for this dump resistor. The basic structure of the proposed dump resistor comprises of stainless steel grids connected in series in the shape of meander to minimize the stray inductance and increase the surface area for cooling. The entire dump resistor will be an array of such grids connected in series and parallel to meet electrical as well as thermal parameters. The maximum temperature of the proposed dump resistor is upto 350 °C during dump 3.5MJ energy. The proposed design permits indigenous fabrication of the dump resistor using commercially available welding techniques. (author)

  3. Design of fast kickers for the ISABELLE beam abort system

    International Nuclear Information System (INIS)

    Nawrocky, R.J.; Montemurro, P.A.; Baron, J.

    1981-01-01

    The ISA beam abort (extraction) system must be highly efficient, in the sense of producing minimum beam loss, and reliable to prevent serious damage to accelerator components by the circulating high-energy beams. Since the stored beams will be debunched, the low-loss requirement can be met only with ultra-thin extraction septa and/or fast-acting kickers. This paper examines the design of the ISA extraction kickers subject to a set of extraction channel constraints and a given maximum working voltage. Expressions are derived for determining system parameters for both a lumped parameter magnet and a delay-line magnet. Using these relationships, design parameters are worked out for several possible system configurations. The paper also describes the construction of a full-scale prototype module of the kicker and summarizes the preliminary test results obtained with the module

  4. Thermomechanical assessment of the effects of a jaw-beam angle during beam impact on Large Hadron Collider collimators

    Science.gov (United States)

    Cauchi, Marija; Assmann, R. W.; Bertarelli, A.; Carra, F.; Lari, L.; Rossi, A.; Mollicone, P.; Sammut, N.

    2015-02-01

    The correct functioning of a collimation system is crucial to safely and successfully operate high-energy particle accelerators, such as the Large Hadron Collider (LHC). However, the requirements to handle high-intensity beams can be demanding, and accident scenarios must be well studied in order to assess if the collimator design is robust against possible error scenarios. One of the catastrophic, though not very probable, accident scenarios identified within the LHC is an asynchronous beam dump. In this case, one (or more) of the 15 precharged kicker circuits fires out of time with the abort gap, spraying beam pulses onto LHC machine elements before the machine protection system can fire the remaining kicker circuits and bring the beam to the dump. If a proton bunch directly hits a collimator during such an event, severe beam-induced damage such as magnet quenches and other equipment damage might result, with consequent downtime for the machine. This study investigates a number of newly defined jaw error cases, which include angular misalignment errors of the collimator jaw. A numerical finite element method approach is presented in order to precisely evaluate the thermomechanical response of tertiary collimators to beam impact. We identify the most critical and interesting cases, and show that a tilt of the jaw can actually mitigate the effect of an asynchronous dump on the collimators. Relevant collimator damage limits are taken into account, with the aim to identify optimal operational conditions for the LHC.

  5. Thermomechanical assessment of the effects of a jaw-beam angle during beam impact on Large Hadron Collider collimators

    Directory of Open Access Journals (Sweden)

    Marija Cauchi

    2015-02-01

    Full Text Available The correct functioning of a collimation system is crucial to safely and successfully operate high-energy particle accelerators, such as the Large Hadron Collider (LHC. However, the requirements to handle high-intensity beams can be demanding, and accident scenarios must be well studied in order to assess if the collimator design is robust against possible error scenarios. One of the catastrophic, though not very probable, accident scenarios identified within the LHC is an asynchronous beam dump. In this case, one (or more of the 15 precharged kicker circuits fires out of time with the abort gap, spraying beam pulses onto LHC machine elements before the machine protection system can fire the remaining kicker circuits and bring the beam to the dump. If a proton bunch directly hits a collimator during such an event, severe beam-induced damage such as magnet quenches and other equipment damage might result, with consequent downtime for the machine. This study investigates a number of newly defined jaw error cases, which include angular misalignment errors of the collimator jaw. A numerical finite element method approach is presented in order to precisely evaluate the thermomechanical response of tertiary collimators to beam impact. We identify the most critical and interesting cases, and show that a tilt of the jaw can actually mitigate the effect of an asynchronous dump on the collimators. Relevant collimator damage limits are taken into account, with the aim to identify optimal operational conditions for the LHC.

  6. Electron beam diagnostic system using computed tomography and an annular sensor

    Science.gov (United States)

    Elmer, John W.; Teruya, Alan T.

    2014-07-29

    A system for analyzing an electron beam including a circular electron beam diagnostic sensor adapted to receive the electron beam, the circular electron beam diagnostic sensor having a central axis; an annular sensor structure operatively connected to the circular electron beam diagnostic sensor, wherein the sensor structure receives the electron beam; a system for sweeping the electron beam radially outward from the central axis of the circular electron beam diagnostic sensor to the annular sensor structure wherein the electron beam is intercepted by the annular sensor structure; and a device for measuring the electron beam that is intercepted by the annular sensor structure.

  7. Molecular beam sampling system with very high beam-to-background ratio: The rotating skimmer concept

    International Nuclear Information System (INIS)

    Benedikt, J.; Ellerweg, D.; Keudell, A. von

    2009-01-01

    A novel method of reducing the background pressure in a vacuum system used for sampling a molecular beam from a high pressure region is presented. A triple differential pumping stage is constructed with a chopper with rotating skimmer within the first pumping stage, which serves effectively as a valve separating periodically the vacuum system from the ambient environment. The mass spectrometry measurement of the species in the molecular beam show an excellent beam-to-background ratio of 14 and a detection limit below 1 ppm. The potential of this method for detection of low density reactive species in atmospheric pressure plasmas is demonstrated for the detection of oxygen atoms generated in an atmospheric pressure microplasma source.

  8. Dose error analysis for a scanned proton beam delivery system

    International Nuclear Information System (INIS)

    Coutrakon, G; Wang, N; Miller, D W; Yang, Y

    2010-01-01

    All particle beam scanning systems are subject to dose delivery errors due to errors in position, energy and intensity of the delivered beam. In addition, finite scan speeds, beam spill non-uniformities, and delays in detector, detector electronics and magnet responses will all contribute errors in delivery. In this paper, we present dose errors for an 8 x 10 x 8 cm 3 target of uniform water equivalent density with 8 cm spread out Bragg peak and a prescribed dose of 2 Gy. Lower doses are also analyzed and presented later in the paper. Beam energy errors and errors due to limitations of scanning system hardware have been included in the analysis. By using Gaussian shaped pencil beams derived from measurements in the research room of the James M Slater Proton Treatment and Research Center at Loma Linda, CA and executing treatment simulations multiple times, statistical dose errors have been calculated in each 2.5 mm cubic voxel in the target. These errors were calculated by delivering multiple treatments to the same volume and calculating the rms variation in delivered dose at each voxel in the target. The variations in dose were the result of random beam delivery errors such as proton energy, spot position and intensity fluctuations. The results show that with reasonable assumptions of random beam delivery errors, the spot scanning technique yielded an rms dose error in each voxel less than 2% or 3% of the 2 Gy prescribed dose. These calculated errors are within acceptable clinical limits for radiation therapy.

  9. ADVANCEMENT OF THE RHIC BEAM ABORT KICKER SYSTEM

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.; MI, J.; OERTER, B.; SANDBERG, J.; WARBURTON, D.

    2003-01-01

    As one of the most critical system for RHIC operation, the beam abort kicker system has to be highly available, reliable, and stable for the entire operating range. Along with the RHIC commission and operation, consistent efforts have been spend to cope with immediate issues as well as inherited design issues. Major design changes have been implemented to achieve the higher operating voltage, longer high voltage hold-off time, fast retriggering and redundant triggering, and improved system protection, etc. Recent system test has demonstrated for the first time that both blue ring and yellow ring beam abort systems have achieved more than 24 hours hold off time at desired operating voltage. In this paper, we report break down, thyratron reverse arcing, and to build a fast re-trigger system to reduce beam spreading in event of premature discharge

  10. Design of the AGS Booster beam position monitor system

    Energy Technology Data Exchange (ETDEWEB)

    Beadle, E.; Brennan, J.M.; Ciardullo, D.J.; Savino, J.; Stanziani, V.; Thomas, R.; Van Zwienen, W.; Witkover, R.L.; Schulte, E. (Brookhaven National Lab., Upton, NY (USA); European Organization for Nuclear Research, Geneva (Switzerland))

    1989-01-01

    The AGS Booster beam position monitor system must cover a wide range of beam intensity and bunch length for proton and heavy ion acceleration. The detector is designed to maintain 0.1 mm local tolerance following 300{degree}C bakeout. The electronics will be located in the tunnel, communicating via fiber optic links to avoid ground loops. The design will be described and test results for prototype units presented. 5 refs., 4 figs.

  11. ISABELLE accelerator software, control system, and beam diagnostic philosophy

    International Nuclear Information System (INIS)

    Cornacchia, M.; Humphrey, J.W.; Niederer, J.; Poole, J.H.

    1981-01-01

    The ISABELLE Project combines two large proton accelerators with two storage rings in the same facility using superconducting magnet technology. This combination leads to severe constraints on beam loss in magnets and involves complex treatment of magnetic field imperfections and correction elements. The consequent demands placed upon beam diagnostics, accelerator model programs, and the computer oriented control system are discussed in terms of an illustrative operation scenario

  12. Beam transport optics for high-power laser systems

    International Nuclear Information System (INIS)

    Taylor, J.R.

    1995-01-01

    Beam transport optics receive output energy from the laser cavity and deliver it to the work site. Depending on the application, this may require a few simple elements or large complex systems. Collection of the laser energy depends on the spatial and temporal energy distribution as well as the wavelength and polarization of the laser cavity and output coupler. Transport optics can perform a variety of functions, including beam formatting, frequency doubling, and distribution to one or more work sites while maintaining or even improving the beam quality. The beam may be delivered to work sites as focused spots or images, projected to distant targets, or propagated through various media for sensing or photochemical processing. Design may involve optical modeling of the system, including diffraction effects and thermal management. A Gaussian beam profile is often used for convenience in modeling. When deviations from this ideal profile need to be considered, it is necessary to characterize the laser beam in detail. Design of the transport system requires understanding of the interaction of the laser energy with optical materials and components. Practical considerations include mounting the optics without stress and with the stability suitable for the intended application. Requirements for beam direction, stability, size, shape, and quality dictate the design approach for each specific situation. Attention also must be given to reliability, environmental, and commercial requirements. Damage to optics in high-power laser systems is a common concern. Environmental problems such as atmospheric turbulence, contamination by dust or vapor from the work site or other sources, or absorption of water vapor can directly degrade beam quality. Other potentially significant optical performance effects may result from instability and aging of the optics, temperature, humidity, pressure, transmitted vibration, and contamination from the work site or other sources

  13. ICFA Beam Dynamics Newsletter

    Energy Technology Data Exchange (ETDEWEB)

    Ben-Zvi I.; Kuczewski A.; Altinbas, Z.; Beavis, D.; Belomestnykh,; Dai, J. et al

    2012-07-01

    The Collider-Accelerator Department at Brookhaven National Laboratory is building a high-brightness 500 mA capable Energy Recovery Linac (ERL) as one of its main R&D thrusts towards eRHIC, the polarized electron - hadron collider as an upgrade of the operating RHIC facility. The ERL is in final assembly stages, with injection commisioning starting in October 2012. The objective of this ERL is to serve as a platform for R&D into high current ERL, in particular issues of halo generation and control, Higher-Order Mode (HOM) issues, coherent emissions for the beam and high-brightness, high-power beam generation and preservation. The R&D ERL features a superconducting laser-photocathode RF gun with a high quantum efficiency photoccathode served with a load-lock cathode delivery system, a highly damped 5-cell accelerating cavity, a highly flexible single-pass loop and a comprehensive system of beam instrumentation. In this ICFA Beam Dynamics Newsletter article we will describe the ERL in a degree of detail that is not usually found in regular publications. We will discuss the various systems of the ERL, following the electrons from the photocathode to the beam dump, cover the control system, machine protection etc and summarize with the status of the ERL systems.

  14. Parallel beam scanning system for flatness measurements of thin plates

    Science.gov (United States)

    Fan, Kuang-Chao; Wu, John H.

    1993-09-01

    This paper describes the work to develop a Parallel Beam Scanning System (PBSS) for the non-contact measurement of surface flatness of thin plates. The PBSS consists of a He-Ne laser source having good pointing stability a scanner to create divergent scanning beams a large aplanatic meniscus lens to convert the divergent beams to parallel beams a linear stage to drive the testpiece to each sampling position a screen for the projection of reflected beams from the tested surface and an image processing unit to analyze the projected image. Due to the out-of-flatness of the surface the straight line formed by the incident parallel beams will be distorted and magnified on the screen as it is reflected from the tested surface. The stage then positions the testpiece step-by-step to carry out measurements in the line-by-line sequence. A CCD camera is employed to capture the image of the distorted line on the screen each time. With the proposed mathematical model the flatness data of the testpiece can be computed from the input image data. Experimental results by the use of this system have shown in good agreement with the results obtained from the coordinate measuring machine. This system can be applied to the flatness measurements of thin plates such as sheet metals sheet moulding compound (SMC) plates glass plates etc. which are difficult to measure by traditional methods.

  15. Comparison of Multi-Beam and Single-Beam Cytofluorometers for an Automated Screening System in Gynecologic Cytology

    Science.gov (United States)

    Fujii, Ken-ichi; Suzuki, Norihito

    1983-09-01

    Clumps of cells often give a false nuclear fluorescence intensity in a measuring system using flow cytofluorometry. In this study, we examined signal selection procedures in multi-beam and single-beam cytofluorometers with the aim of eliminating such false signals. The signal selection in the multi-beam cytofluorometer was found to be far superior to that in a single-beam cytofluorometer, and the problem of false nuclear fluorescence intensity is effectively obviated by using the former type of cytofluarometer.

  16. Fluka and thermo-mechanical studies for the CLIC main dump

    CERN Document Server

    Mereghetti, Alessio; Vlachoudis, Vasilis

    2011-01-01

    In order to best cope with the challenge of absorbing the multi-MW beam, a water beam dump at the end of the CLIC post-collision line has been proposed. The design of the dump for the Conceptual Design Report (CDR) was checked against with a set of FLUKA Monte Carlo simulations, for the estimation of the peak and total power absorbed by the water and the vessel. Fluence spectra of escaping particles and activation rates of radio-nuclides were computed as well. Finally, the thermal transient behavior of the water bath and a thermo-mechanical analysis of the preliminary design of the window were done.

  17. A set of dosimetry systems for electron beam irradiation

    International Nuclear Information System (INIS)

    Lin Min; Lin Jingwen; Chen Yundong; Li Huazhi; Xiao Zhenhong; Gao Juncheng

    1999-01-01

    To follow the rapid development of radiation processing with electron beams, it is urgent to set up a set of dosimetric standards to provide Quality Assurance (QA) of electron beam irradiation and unify the values of the quality of the absorbed dose measurements for electron beams. This report introduces a set of dosimetry systems established in Radiometrology Center of China Institute of Atomic Energy (RCCIAE), which have been or will be used as dosimetric standards in the Nuclear Industry System (NIS) in China. For instance, the potassium (silver) dichromate and ceric-cerous sulfate dosimetry systems will be used as standard dosimeters, while alanine-ESR dosimetry system as a transfer dosimeter, and FJL-01 CTA as a routine dosimeter. (author)

  18. Doublet III neutral beam multi-stream command language system

    International Nuclear Information System (INIS)

    Campbell, L.; Garcia, J.R.

    1983-01-01

    A multi-stream command language system was developed to provide control of the dual source neutral beam injectors on the Doublet III experiment at GA Technologies Inc. The Neutral Beam command language system consists of three parts: compiler, sequencer, and interactive task. The command language, which was derived from the Doublet III tokamak command language, POPS, is compiled, using a recursive descent compiler, into reverse polish notation instructions which then can be executed by the sequencer task. The interactive task accepts operator commands via a keyboard. The interactive task directs the operation of three input streams, creating commands which are then executed by the sequencer. The streams correspond to the two sources within a Doublet III neutral beam, plus an interactive stream. The sequencer multiplexes the execution of instructions from these three streams. The instructions include reads and writes to an operator terminal, arithmetic computations, intrinsic functions such as CAMAC input and output, and logical instructions. The neutral beam command language system was implemented using Modular Computer Systems (ModComp) Pascal and consists of two tasks running on a ModComp Classic IV computer. The two tasks, the interactive and the sequencer, run independently and communicate using shared memory regions. The compiler runs as an overlay to the interactive task when so directed by operator commands. The system is succesfully being used to operate the three neutral beams on Doublet III

  19. Beam position measurement system at the Fermilab main accelerator

    International Nuclear Information System (INIS)

    Kerns, Q.A.

    1975-01-01

    The beam position system of the Fermilab Main Ring contains one horizontal and one vertical Electrostatic Beam Pickup in each of the 96 cells of the machine. A pair of 75 ohm cables transmits the induced signal from the machine tunnel to the nearest service building. In each of the 24 service buildings, there is a solid-state multiplexer and a beam position detector which processes the A-B signal pairs to produce an intensity-normalized voltage proportional to beam displacement. This voltage is digitized, read into buffer of the Lockheed MAC A, and in turn transferred to the Xerox 530. Horizontal or vertical orbits can be obtained in 50 millisec. Orbits are obtained at injection and at a Main Ring Sample time, if requested, anywhere on the acceleration cycle. Injection orbits can be flattened automatically by a program that sets dipole trim magnets. (auth)

  20. Rapid cycling medical synchrotron and beam delivery system

    Science.gov (United States)

    Peggs, Stephen G [Port Jefferson, NY; Brennan, J Michael [East Northport, NY; Tuozzolo, Joseph E [Sayville, NY; Zaltsman, Alexander [Commack, NY

    2008-10-07

    A medical synchrotron which cycles rapidly in order to accelerate particles for delivery in a beam therapy system. The synchrotron generally includes a radiofrequency (RF) cavity for accelerating the particles as a beam and a plurality of combined function magnets arranged in a ring. Each of the combined function magnets performs two functions. The first function of the combined function magnet is to bend the particle beam along an orbital path around the ring. The second function of the combined function magnet is to focus or defocus the particle beam as it travels around the path. The radiofrequency (RF) cavity is a ferrite loaded cavity adapted for high speed frequency swings for rapid cycling acceleration of the particles.

  1. Pulsed magnet systems for high energy physics beam lines

    International Nuclear Information System (INIS)

    Praeg, W.F.

    1975-01-01

    During the past years pulsed magnet systems have been developed at Argonne National Laboratory to transport beam bursts of charged high energy particles of the Zero Gradient Synchrotron (ZGS) facility. The particular features of the switching circuits, the power supplies and the magnets are described. Included are septum, quadrupole, beam shutter and bending magnets with energies ranging from 25 J to 100 kJ. The degree to which magnet current must be repeated and held constant (flattopped) during beam spill varies from +-5 percent for a beam shutter magnet to +-0.005 percent for a bending magnet; the duration of flattop ranges from a few μs to many ms. (U.S.)

  2. Application of virtual instrument in accelerator beam measurement system

    International Nuclear Information System (INIS)

    Huang Guoqing; China Science and Technology Univ., Hefei; Yu Xiaoqi; Zhang Pengfei

    2007-01-01

    Virtual instrument is a novel computer-based technical method of measurement, which has got rapidly development and has been applied in many fields because of a variety of advantages. In this paper we mainly introduce application of virtual instrument in accelerator beam measurement system. Beam measurement system is an important part of accelerator technology and has important effect on accelerator debugging, running and machine research. Adopting new measurement methods and increasing accuracy of measurement directly affect accelerator debugging and running. Now many accelerators have been adopted virtual instrument system. (authors)

  3. Large amplitude forced vibration analysis of cross-beam system ...

    African Journals Online (AJOL)

    Large amplitude forced vibration behaviour of cross-beam system under harmonic excitation is studied, incorporating the effect of geometric non-linearity. The forced vibration analysis is carried out in an indirect way, in which the dynamic system is assumed to satisfy the force equilibrium condition at peak load value, thus ...

  4. Solid waste dumping site suitability analysis using geographic ...

    African Journals Online (AJOL)

    Solid waste dumping site suitability analysis using geographic information system (GIS) and remote sensing for Bahir Dar Town, North Western Ethiopia. ... The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

  5. A high energy neutral beam system for reactors

    International Nuclear Information System (INIS)

    Anderson, O.A.; Chan, C.F.; Cooper, W.S.

    1988-09-01

    High energy neutral beams provide a promising method of heating and driving current in steady-state tokamak fusion reactors. As an example, we have made a conceptual design of a neutral beam system for current drive on the International Thermonuclear Experimental Reactor (ITER). The system, based on electrostatic acceleration of D/sup /minus// ions, can deliver up to 100 MW of 1.6 MeV D 0 neutrals through three ports. Radiation protection is provided by locating sensitive beamline components 35 to 50 m from the reactor. In an application to a 3300 MW power reactor, a system delivering 120 MW of 2-2.4 MeV deuterium beams assisted by 21 MW of lower hybrid wave power drives 25 MA and provides an adequate plasma power gain (Q = 24) for a commercial fusion power plant. 8 refs., 1 fig., 2 tabs

  6. RAMI Analyses of Heating Neutral Beam and Diagnostic Neutral Beam Systems for ITER

    Science.gov (United States)

    Chang, D. H.; Lee, S.; Hemsworth, R.; van Houtte, D.; Okayama, K.; Sagot, F.; Schunke, B.; Svensson, L.

    2011-09-01

    A RAMI (Reliability, Availability, Maintainability, Inspectability) analysis has been performed for the heating (& current drive) neutral beam (HNB) and diagnostic neutral beam (DNB) systems of the ITER device [1-3]. The objective of these analyses is to implement RAMI engineering requirements for design and testing to prepare a reliability-centred plan for commissioning, operation, and maintenance of the system in the framework of technical risk control to support the overall ITER Project. These RAMI requirements will correspond to the RAMI targets for the ITER project and the compensating provisions to reach them as deduced from the necessary actions to decrease the risk level of the function failure modes. The RAMI analyses results have to match with the procurement plan of the systems.

  7. RAMI Analyses of Heating Neutral Beam and Diagnostic Neutral Beam Systems for ITER

    International Nuclear Information System (INIS)

    Chang, D. H.; Lee, S.; Hemsworth, R.; Houtte, D. van; Okayama, K.; Sagot, F.; Schunke, B.; Svensson, L.

    2011-01-01

    A RAMI (Reliability, Availability, Maintainability, Inspectability) analysis has been performed for the heating (and current drive) neutral beam (HNB) and diagnostic neutral beam (DNB) systems of the ITER device. The objective of these analyses is to implement RAMI engineering requirements for design and testing to prepare a reliability-centred plan for commissioning, operation, and maintenance of the system in the framework of technical risk control to support the overall ITER Project. These RAMI requirements will correspond to the RAMI targets for the ITER project and the compensating provisions to reach them as deduced from the necessary actions to decrease the risk level of the function failure modes. The RAMI analyses results have to match with the procurement plan of the systems.

  8. TFTR neutral beam systems conceptual design

    Energy Technology Data Exchange (ETDEWEB)

    1976-03-01

    The functions, design requirements, and design descriptions of the injection system are described. Cost summaries are given for each system and subsystem. The costs presented are for: materials procurement; and shipping, assembly, and installation at the Princeton site. (MOW)

  9. A Versatile Beam Loss Monitoring System for CLIC

    CERN Document Server

    Kastriotou, Maria; Farabolini, Wilfrid; Holzer, Eva Barbara; Nebot Del Busto, Eduardo; Tecker, Frank; Welsch, Carsten

    2016-01-01

    The design of a potential CLIC beam loss monitoring (BLM) system presents multiple challenges. To successfully cover the 48 km of beamline, ionisation chambers and optical fibre BLMs are under investigation. The former fulfils all CLIC requirements but would need more than 40000 monitors to protect the whole facility. For the latter, the capability of reconstructing the original loss position with a multi-bunch beam pulse and multiple loss locations still needs to be quantified. Two main sources of background for beam loss measurements are identified for CLIC. The two-beam accelerator scheme introduces so-called crosstalk, i.e. detection of losses originating in one beam line by the monitors protecting the other. Moreover, electrons emitted from the inner surface of RF cavities and boosted by the high RF gradients may produce signals in neighbouring BLMs, limiting their ability to detect real beam losses. This contribution presents the results of dedicated experiments performed in the CLIC Test Facility to qu...

  10. Understanding Beam Alignment in a Coherent Lidar System

    Science.gov (United States)

    Prasad, Narasimha S.; Roychoudhari, Chandrasekhar

    2015-01-01

    Optical beam alignment in a coherent lidar (or ladar) receiver system plays a critical role in optimizing its performance. Optical alignment in a coherent lidar system dictates the wavefront curvature (phase front) and Poynting vector) matching of the local oscillator beam with the incoming receiver beam on a detector. However, this alignment is often not easy to achieve and is rarely perfect. Furthermore, optical fibers are being increasingly used in coherent lidar system receivers for transporting radiation to achieve architectural elegance. Single mode fibers also require stringent mode matching for efficient light coupling. The detector response characteristics vary with the misalignment of the two pointing vectors. Misalignment can lead to increase in DC current. Also, a lens in front of the detector may exasperate phase front and Poynting vector mismatch. Non-Interaction of Waves, or the NIW property indicates the light beams do not interfere by themselves in the absence of detecting dipoles. In this paper, we will analyze the extent of misalignment on the detector specifications using pointing vectors of mixing beams in light of the NIW property.

  11. An Expert System For Tuning Particle-Beam Accelerators

    Science.gov (United States)

    Lager, Darrel L.; Brand, Hal R.; Maurer, William J.; Searfus, Robert M.; Hernandez, Jose E.

    1989-03-01

    We have developed a proof-of-concept prototype of an expert system for tuning particle beam accelerators. It is designed to function as an intelligent assistant for an operator. In its present form it implements the strategies and reasoning followed by the operator for steering through the beam transport section of the Advanced Test Accelerator at Lawrence Livermore Laboratory's Site 300. The system is implemented in the language LISP using the Artificial Intelligence concepts of frames, daemons, and a representation we developed called a Monitored Decision Script.

  12. Efficiency of Low-Profile External Dumping at Open Pit Coal Mining in Kemerovo Region

    Science.gov (United States)

    Selyukov, Alexey; Ermolaev, Vyacheslav; Kostinez, Irina

    2017-11-01

    Kemerovo region is one of the largest industrial regions of Russia, with a raw material specialization. The rapid growth of the coal industry in recent years has been greatly facilitated by the expansion and development of open pit mining for coal seams extraction, accompanied by an increase in the volumes of overburden and the height of the dumps. There are about 400 objects in the Russian Federation Government Register of Waste Disposal Facilities 80% of which are dumps. Approaches both to external dumping and to the technical stage of reclamation currently contribute to the growth of geomorphic system's instability. Thus, it is proposed to slightly change the approaches to external dumping: the essence consists in the formation of an external dump of overburden, which in future would represent a favorable landscape unit of a flat surface relief used for subsequent differently directed purposes.

  13. Efficiency of Low-Profile External Dumping at Open Pit Coal Mining in Kemerovo Region

    Directory of Open Access Journals (Sweden)

    Selyukov Alexey

    2017-01-01

    Full Text Available Kemerovo region is one of the largest industrial regions of Russia, with a raw material specialization. The rapid growth of the coal industry in recent years has been greatly facilitated by the expansion and development of open pit mining for coal seams extraction, accompanied by an increase in the volumes of overburden and the height of the dumps. There are about 400 objects in the Russian Federation Government Register of Waste Disposal Facilities 80% of which are dumps. Approaches both to external dumping and to the technical stage of reclamation currently contribute to the growth of geomorphic system's instability. Thus, it is proposed to slightly change the approaches to external dumping: the essence consists in the formation of an external dump of overburden, which in future would represent a favorable landscape unit of a flat surface relief used for subsequent differently directed purposes.

  14. 40 CFR 227.14 - Criteria for evaluating the need for ocean dumping and alternatives to ocean dumping.

    Science.gov (United States)

    2010-07-01

    ... ocean dumping and alternatives to ocean dumping. 227.14 Section 227.14 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CRITERIA FOR THE EVALUATION OF PERMIT APPLICATIONS FOR OCEAN DUMPING OF MATERIALS Need for Ocean Dumping § 227.14 Criteria for evaluating the need for ocean...

  15. Compact pulsed electron beam system for microwave generation

    Science.gov (United States)

    Sharma, S. K.; Deb, P.; Shukla, R.; Banerjee, P.; Prabaharan, T.; Adhikary, B.; Verma, R.; Sharma, A.; Shyam, A.

    2012-11-01

    A compact 180 kV electron beam system is designed for high power microwave generation. The electron beam system is consists of a secondary energy storage device, which can deliver energy to the load at faster rate than usual primary energy storage system such as tesla transformers or marx generator. The short duration, high voltage pulse with fast rise time and good flattop is applied to vacuum diode for high power microwave generation. The compact electron beam system is made up of single turn primary tesla transformer which charges a helical pulse forming line and transfers its energy to vacuum diode through a high voltage pressurized spark gap switch. We have used helical pulse forming line which has higher inductance as compared to coaxial pulse forming line, which in turns increases, the pulse width and reduce the length of the pulse forming line. Water dielectric medium is used because of its high dielectric constant, high dielectric strength and efficient energy storage capability. The time dependent breakdown property and high relative permittivity of water makes it an ideal choice for this system. The high voltage flat-top pulse of 90 kV, 260 ns is measured across the matched load. In this article we have reported the design details, simulation and initial experimental results of 180 kV pulsed electron beam system for high power microwave generation.

  16. Preliminary design of the pulse generator for the CLIC damping ring extraction system

    CERN Document Server

    Holma, Janne; Ovaska, Seppo

    2011-01-01

    The spent drive beam must be cleanly extracted and bent away from the decelerator axis at the end of each CLIC decelerator in order to leave space for injecting a fresh beam train in the next sector. Then the spent beam must be safely absorbed. A compact extraction system made of a single dipole is proposed. The spent beam is driven to a water dump located at 20m downstream of the extraction point and transversely 6m away of the axis of the main linac. An adequate spread of the beam impact map on the dump offers small temperature excursions in both the dump and its entrance window, allowing for reliable operation and a long lifetime of the system.

  17. System effects influencing the bending strength of timber beams

    DEFF Research Database (Denmark)

    Ditlevsen, Ove Dalager; Källsner, B.

    1998-01-01

    measurements of the strengths of a large number of shorttest pieces cut from the beams such that judgementally each test piece contains only a single defect cluster. The testpiece is spliced to stronger wood beam shafts in both ends. Due to the occurrence of a substantial number of splicefailures in the total...... test series of 197 tests a special maximum likelihood estimation procedure is applied to estimate theparameters. Assuming that the estimated parameters are applicable in the series system model for the full uncutbeams a theoretical bending strength distribution function is obtained in dependence......A stochastic model of hierarchical series system type for the bending strength of spruce beams isdefined from the anticipation that the bending failure takes place at a cross-section with a defect cluster formed by knots or grain irregularities. The parameters of the model are estimated from...

  18. Electronics and Calibration system for the CMS Beam Halo Monitor

    CERN Document Server

    Tosi, Nicolò; Fabbri, Franco L; Finkel, Alexey; Orfanelli, Stella; Loos, R; Montanari, Alessandro; Rusack, R; Stickland, David P

    2014-01-01

    In the context of increasing luminosity of LHC, it will be important to accurately measure the Machine Induced Background. A new monitoring system will be installed in the cavern of the Compact Muon Solenoid (CMS) experiment for measuring the beam background at high radius. This detector is composed of synthetic quartz Cherenkov radiators, coupled to fast photomultiplier tubes (PMT). The readout chain of this detector will make use of many components developed for the Phase 1 upgrade to the CMS Hadron Calorimeter electronics, with a dedicated firmware and readout adapted to the beam monitoring requirements. The PMT signal will be digitized by a charge integrating ASIC (QIE10), providing both the signal rise time and the charge integrated over one bunch crossing. The backend electronics will record bunch-by-bunch histograms, which will be published to CMS and the LHC using the newly designed CMS beam instrumentation specific DAQ. A calibration monitoring system has been designed to generate triggered pulses of...

  19. Development of global data warehouse for beam diagnostics at SSRF

    International Nuclear Information System (INIS)

    Lai Longwei; Leng Yongbin; Yan Yingbing; Chen Zhichu

    2015-01-01

    The beam diagnostic system is adequate during the daily operation and machine study at the Shanghai Synchrotron Radiation Facility (SSRF). Without the effective event detecting mechanism, it is difficult to dump and analyze abnormal phenomena such as the global orbital disturbance, the malfunction of the BPM and the noise of the DCCT. The global beam diagnostic data warehouse was built in order to monitor the status of the accelerator and the beam instruments. The data warehouse was designed as a Soft IOC hosted on an independent server. Once abnormal phenomena happen it will be triggered and will store the relevant data for further analysis. The results show that the data warehouse can detect abnormal phenomena of the machine and the beam diagnostic system effectively, and can be used for calculating confidential indicators of the beam instruments. It provides an efficient tool for the improvement of the beam diagnostic system and accelerator. (authors)

  20. Development of KOMAC Beam Monitoring System Using EPICS

    International Nuclear Information System (INIS)

    Song, Young-Gi; Yun, Sang-Pil; Kim, Han-Sung; Kwon, Hyeok-Jung; Cho, Yong-Sub

    2014-01-01

    The beam loss signals must be digitized and the sampling has to be synchronized to a reference signal which is an external trigger for beam operation. The digitized data must be accessible by the Experimental Physics and Industrial Control System (EPICS)-based control system, which manages the whole accelerator control. In order to satisfy the requirement, an Input /Output Controller (IOC), which runs Linux on a CPU module with PCI express based Analog to Digital Converter (ADC) modules, has been adopted. An associated linux driver and EPICS device support module also have been developed. The IOC meets the requirements and the development and maintenance of the software for the IOC is considerably efficient. The data acquisition system running EPICS will be used in increasing phase of KOrea Multi-purpose Accelerator Complex (KOMAC) beam power. The beam monitoring system integrates BLM and BPM signals into control system and offers real-time data to operators. The IOC, which is implemented with Linux and PCI driver, has supported data acquisition as a very flexible solution

  1. Neutral beam control systems for the Tandem Mirror Experiment

    International Nuclear Information System (INIS)

    Ross, R.I.

    1979-01-01

    The Tandem Mirror Experiment (TMX) is presently developing the technology and approaches which will be used in larger fusion systems. This paper describes some of the designs which were used in creating the control system for the TMX neutral beams. To create a system of controls that would work near these large, rapid switching current sources required a mixture of different technologies: fiberoptic data transmission, printed circuit and wirewrap techniques, etc

  2. Beam position monitor system of J-PARC RCS

    Energy Technology Data Exchange (ETDEWEB)

    Hayashi, N., E-mail: naoki.hayashi@j-parc.jp [Accelerator Division, J-PARC Center, Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki 319-1195 (Japan); Kawase, M.; Hatakeyama, S.; Hiroki, S.; Saeki, R.; Takahashi, H.; Teruyama, Y.; Toyokawa, R. [Accelerator Division, J-PARC Center, Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki 319-1195 (Japan); Arakawa, D.; Hiramatsu, S.; Lee, S.; Satou, K.; Tejima, M.; Toyama, T. [High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki 305-0801 (Japan)

    2012-06-11

    The J-PARC RCS is a 25 Hz Rapid-Cycling proton Synchrotron and its designed beam power is 1 MW. The beam position monitor (BPM) system at J-PARC RCS is described in this paper. The pre-defined diameter of the BPM detectors is larger than 250 mm, however, the system has to measure the beam position very accurately. In addition, it is necessary to have a large dynamic range. The system should work not only for the high intensity but also for low intensity, such as during beam commissioning, when the intensity is below 1% of the design intensity. There are 54 BPM detectors around the ring and most of them are placed inside steering magnets because of quite limited space. The BPM detector is an electro-static type and it has four electrodes, and a pair of electrodes gives a good linear response with a diagonal cut shape to detect the charge center precisely. The signal processing units, which are equipped with 14-bit 40 MS/s ADC and 600 MHz DSP, have been developed. They are accessed via shared memory space and controlled by EPICS. Such a processing unit is capable of recording the full 25 Hz pulse data for the so-called 'COD mode' (averaged beam position calculation) and it can also store the whole waveform data for further analysis, like turn-by-turn position calculation. The resolution was estimated to be 20{mu}m for 'COD mode' and to be 0.3 mm for the turn-by-turn mode with relatively low intensity of 8 Multiplication-Sign 10{sup 11}ppp. The position accuracy is estimated to be about 0.5 mm using a newly developed Beam Based Alignment (BBA) method.

  3. Conceptual Design of the Linac4 Main Dump

    CERN Document Server

    Leitao, I V; Maglioni, C

    2012-01-01

    Linac4 is the new CERN linear accelerator intended to replace the ageing Linac2 as the injector to the Proton Synchrotron Booster (PSB) for increasing the luminosity of the Large Hadron Collider (LHC). By delivering a 160MeV H- beam, Linac4 will provide the necessary conditions to double the brightness and intensity of the beam extracted from the PSB. This paper describes the conceptual design of the Linac4 Main Dump, where two different concepts relying respectively on water and air cooling were compared and evaluated. Based on the application of analytical models for the energy deposited by the beam, heat conduction and cooling concepts, a parametric study was performed. This approach allowed the identification of the “optimal” configuration for these two conceptual geometries and their relative comparison. Besides giving the theoretical guidelines for the design of the new dump, this work also contributes to the development of analytical tools to allow a better understanding of the influence of the se...

  4. Longitudinal beam instabilities in a double RF system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00229208; Gazis, Evangelos

    Operation with a double RF system is essential for many accelerators in order to increase beam stability, to change the bunch shape or to perform various RF manipulations. This is also the case for the operation of the CERN SPS as the LHC proton injector, where in addition to the main RF system, a fourth harmonic RF system is used in bunch shortening mode in order to increase the synchrotron frequency spread inside the bunch and thus to enhance Landau damping of the collective instabilities. In fact the double RF system operation in the SPS is one of the essential means, together with the controlled longitudinal emittance blow-up to significantly increase the longitudinal instability thresholds (single and multi-bunch) and deliver a good quality beam for the LHC. However, for the HiLumi-LHC (HL-LHC) and LHC injector upgrade (LIU) projects higher beam intensities are required. After all upgrades are in place, the main performance limitations of the LHC injector complex are beam instabilities and high intensity...

  5. Measuring and recording system for electron beam welding parameters

    International Nuclear Information System (INIS)

    Lobanova, N.G.; Lifshits, M.L.; Efimov, I.I.

    1987-01-01

    The observation possibility during electron beam welding of circular articles with guaranteed clearance of welding bath leading front in joint gap and flare cloud over the bath by means of television monitor is considered. The composition and operation mode of television measuring system for metric characteristics of flare cloud and altitude of welding bath leading front in the clearance are described

  6. Beam excitation and damping with the transverse feedback system

    International Nuclear Information System (INIS)

    Pellegrin, J.L.; Rees, J.R.

    1979-08-01

    The questions often come up, ''What is the strength if the beam excitation system? How much damping can the transverse feedback provide?'' The design is now advanced enough to answer these questions; also, laboratory tests of some components have been conducted and we know what can be expected of the hardware. This paper discusses these questions

  7. Large amplitude forced vibration analysis of cross-beam system ...

    African Journals Online (AJOL)

    user

    energy method. A. Mitra. *. ,P. Sahoo, K. N. Saha. Department of Mechanical Engineering, Jadavpur University, Kolkata 700032, INDIA. *Corresponding Author: e-mail: samik893@gmail.com. Abstract. Large amplitude forced vibration behaviour of cross-beam system under harmonic excitation is studied, incorporating the.

  8. A beam radiation monitoring and protection system for AGS secondary beams

    International Nuclear Information System (INIS)

    Levine, G.S.

    1978-01-01

    A commercially available radiation monitor using a scintillation detector was modified for charged particle beam monitoring. The device controls access to secondary beams of the AGS and limits beam intensity

  9. ESRF synchrotron injector beam position monitor system

    International Nuclear Information System (INIS)

    Scheidt, K.; Loyer, F.

    1992-01-01

    The complete lay-out of the BPM system which comprises 75 individual stations is presented from electro-static button signals down to the user level of the computer interface. The design of the electrode button and the block geometry is presented. The timing and the data-acquisition electronics permit precisely timed measurements to be taken simultaneously on all 75 BPM stations at a rate of 1 KHz. The results of this BPM system, are summarised with the performance characteristics of resolution, precision and reproductibility. (author) 4 refs.; 4 figs

  10. Daily check of the electron beams with a diode system

    Energy Technology Data Exchange (ETDEWEB)

    Pilette, P. [Hospital Civil de Charleroi (Belgium). Centre for Radiotherapy

    1995-12-01

    A fast systems to check all the accelerator beams on a daily basis has been developed. A cheap home-made detector, based on non-medical diodes (type 1N5408), has been used since July 1992 to verify all the electron beams every day. The relative energy and Top-cGy correspondence is verified with one single irradiation of less than 1 minute by 6 diodes fixed in a polystyrene phantom. The principle of construction, software implementation and results are presented.

  11. Implementation of Beam-Loss Monitor systems for the SSC

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.G.

    1994-07-01

    Beam-Loss Monitors (BLM) are used with each accelerator in the Superconducting Super Collider complex. The primary purpose of these detectors is to protect the accelerators from damage due to the loss of protons. Although the range of primary beam energies to be covered is very large, 20 MeV to 20 TeV, we plan to maintain commonality of detectors and electronics as much as possible. In this report the plans for developing and implementing BLM systems for each of the accelerators will be discussed. Possible solutions to problems that have been identified are presented.

  12. Rapid Process to Generate Beam Envelopes for Optical System Analysis

    Science.gov (United States)

    Howard, Joseph; Seals, Lenward

    2012-01-01

    The task of evaluating obstructions in the optical throughput of an optical system requires the use of two disciplines, and hence, two models: optical models for the details of optical propagation, and mechanical models for determining the actual structure that exists in the optical system. Previous analysis methods for creating beam envelopes (or cones of light) for use in this obstruction analysis were found to be cumbersome to calculate and take significant time and resources to complete. A new process was developed that takes less time to complete beam envelope analysis, is more accurate and less dependent upon manual node tracking to create the beam envelopes, and eases the burden on the mechanical CAD (computer-aided design) designers to form the beam solids. This algorithm allows rapid generation of beam envelopes for optical system obstruction analysis. Ray trace information is taken from optical design software and used to generate CAD objects that represent the boundary of the beam envelopes for detailed analysis in mechanical CAD software. Matlab is used to call ray trace data from the optical model for all fields and entrance pupil points of interest. These are chosen to be the edge of each space, so that these rays produce the bounding volume for the beam. The x and y global coordinate data is collected on the surface planes of interest, typically an image of the field and entrance pupil internal of the optical system. This x and y coordinate data is then evaluated using a convex hull algorithm, which removes any internal points, which are unnecessary to produce the bounding volume of interest. At this point, tolerances can be applied to expand the size of either the field or aperture, depending on the allocations. Once this minimum set of coordinates on the pupil and field is obtained, a new set of rays is generated between the field plane and aperture plane (or vice-versa). These rays are then evaluated at planes between the aperture and field, at a

  13. EU Lobbying and Anti-Dumping Policy

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Ulff-Møller; Svendsen, Gert Tinggaard

    2012-01-01

    Lobbying in the EU is difficult to measure. It varies in intensity and modes of expression across different policy areas and EU countries. By looking at a specific EU policy area this paper suggests to measure differences in the lobbying activity across EU countries by the combination...... of petitioning firms and Council voting in the case of anti-dumping policy. If the political position of countries in anti-dumping cases is influenced by domestic lobbying efforts, we expect that the empirical pattern of country distribution of petitioning firms in EU anti-dumping cases corresponds closely...... to the empirical pattern of EU country distribution in Council voting. Our results show a low petitioning intensity for anti-dumping investigations and a high voting intensity against anti-dumping measures in Northern Europe. Thus, it seems likely that domestic lobbying efforts have influenced the political...

  14. Applications of FASTBUS to beam diagnostics and experiment data systems

    International Nuclear Information System (INIS)

    Machen, D.R.

    1983-01-01

    A five-year effort by the North American NIM Committee, in collaboration with the ESONE Committee of European Laboratories, has resulted in a specification for the FASTBUS modular high-speed data-acquisition system. The system is designed around an emitter-coupled logic (ECL) 32-bit data bus for asynchronous data transmission at 100 ns per transaction. Initial applications of FASTBUS will be in experiment data systems at accelerator facilities worldwide--beam diagnostic data systems on the accelerator side and particle-beam experiment data systems in the experimental area. As the specification (and the resulting hardware and software) matures, real-time machine-control applications will become possible. This paper discusses the near-term use of FASTBUS in accelerator beam-diagnostics instrumentation systems, where an extra increment in system throughput and front-end processing speed can produce a greater understanding of the physical phenomena under study. The arguments and conclusions may be equally well applied to other similar data-handling problems requiring high bandwidth in the data system

  15. Design of automatic tracking system for electron beam welding

    International Nuclear Information System (INIS)

    He Chengdan; Chinese Academy of Space Technology, Lanzhou; Li Heqi; Li Chunxu; Ying Lei; Luo Yan

    2004-01-01

    The design and experimental process of an automatic tracking system applied to local vacuum electron beam welding are dealt with in this paper. When the annular parts of an exactitude apparatus were welded, the centre of rotation of the electron gun and the centre of the annular weld are usually not superposed because of the machining error, workpiece's setting error and so on. In this teaching process, a little bundle of electron beam is used to scan the weld groove, the amount of the secondary electrons reflected from the workpiece is different when the electron beam scans the both sides and the centre of the weld groove. The difference can indicate the position of the weld and then a computer will record the deviation between the electron beam spot and the centre of the weld groove. The computer will analyze the data and put the data into the storage software. During the welding process, the computer will modify the position of the electron gun based on the deviation to make the electron beam spot centered on the annular weld groove. (authors)

  16. Beam - and drive - controlled amplifier for the ISABELLE accelerating system

    International Nuclear Information System (INIS)

    Luccio, A.; Puglisi, M.

    1981-01-01

    The need of very low output impedance rf systems for heavy particle accelerators has led to the development of very sophisticated amplifier configurations. Among them, the use of a common-anode final amplifier seems most promising. If the output impedance is defined in the Thevenin Theorem sense, then class-A operation seems unavoidable. However, for particle dynamics only the voltage induced by the beam is of real concern and voltage requirements do not necessarily demand a time invariant output impedance. These considerations led to investigation of the conditions that must be met to obtain control over the beam-induced voltage. It was possible to demonstrate that in the common anode case the induced voltage can be largely independent of the bias applied to the final tube, if the beam loading is very strong

  17. Effects on the environment of the dumping of nuclear wastes

    International Nuclear Information System (INIS)

    1990-07-01

    Nationally and internationally accepted procedures and technologies are available for the safe handling and disposal of radioactive wastes. Authorized waste disposal practices are designed to ensure that there will be no significant impacts on man and his environment. 'Dumping' of nuclear wastes may result in the elimination of one or more of the multibarriers of protection inherent in an effective radioactive waste management system, thereby increasing the risk of radiological exposure to man and his environment. Quantitative assessments of the degree of environmental contamination and of the resulting hazards to man depend on the specific conditions surrounding the 'uncontrolled disposal' of radioactive waste. These include the nature and activity level of the waste, the physical form of the waste, the package that the waste is contained in and the characteristics of the dumping site. Depending on the scenario envisaged, the consequences of 'uncontrolled disposal' could vary from being insignificant to a situation where there is a significant hazard to an exposed population group. International transactions involving nuclear wastes are taking place between countries on the basis of bilateral agreements and under strict regulatory supervision so that radioactive wastes are transferred safely from one controlled area to another. Such transactions may increase in the future with increased international co-operation in sharing common waste repositories. No evidence exists that confirms that transboundary dumping of radioactive waste has occurred. Investigation of alleged dumping of radioactive wastes by the International Atomic Energy Agency has revealed that the 'suspect wastes' did not contain radioactive material. 2 tabs

  18. Preliminary thermo-mechanical analysis of angular beam impact on LHC collimators

    CERN Document Server

    Cauchi, M; Bertarelli, A; Carra, F; Dallocchio, A; Deboy, D; Mariani, N; Rossi, A; Lari, L; Mollicone, P; Sammut, N

    2012-01-01

    The correct functioning of the LHC Collimation System is crucial to attain the desired LHC luminosity performance. However, the requirements to handle high intensity beams can be demanding. In this respect, accident scenarios must be well studied in order to assess their effect on the robustness of the collimators. One of the most probable accident scenarios identified is an asynchronous beam dump coupled with slight angular misalignment errors of the collimator installation at the beam-line. Previous work presented a preliminary thermal evaluation of the extent of beam-induced damage for such scenarios, where it was shown that in some cases, a tilt of the jaw could actually serve to mitigate the effect of an asynchronous dump on the collimators. This paper will further analyze the response of tertiary collimators in presence of such angular jaw alignments. Such work will also help to start identifying optimal operational conditions.

  19. The software for the CERN LEP beam orbit measurement system

    International Nuclear Information System (INIS)

    Morpurgo, G.

    1992-01-01

    The Beam Orbit Measurement (BOM) system of LEP consists of 504 pickups, distributed all around the accelerator, that are capable of measuring the positions of the two beams. Their activity has to be synchronized, and the data produced by them have to be collected together, for example to form a 'closed orbit measurement' or a 'trajectory measurement'. On the user side, several clients can access simultaneously the results from this instrument. An automatic acquisition mode, and an 'on request' one, can run in parallel. This results in a very flexible and powerful system. The functionality of the BOM system is fully described, as well as the structure of the software processes which constitute the system, and their interconnections. Problems solved during the implementation are emphasized. (author)

  20. Electron beam extraction system with a ring radiation field

    International Nuclear Information System (INIS)

    Auslender, V.L.; Kuksanov, N.K.; Polyakov, V.A.; Salimov, R.A.; Chertok, I.L.

    1979-01-01

    Description and results of testings of two electron beam extraction systems for shaping of a circular irradiation field are given. One of the systems contains three 20 cm long outlet windows arranged at 120 deg angle with respect to each other. Tests at the ILU-6 accelerator have shown that the given system provides 150 mm zone irradiation from three sides. Beam utilization factor when irradiating three 40 mm dia tubes amounted to 35% which provides capacity of 2.5 txMrad/h at 20 kW beam power. The other extraction system includes two C-form magnets producing nonuniform and opposing magnetic fields. This system tests at the EhLV-2 accelerator have shown that at 0.8-1.5 MeV electron energy it is possible to irradiate of 60 and 100 mm dia objects, accordingly. The system may be used together with both constant-action and pulse-action accelerators having extraction with linear scanning [ru

  1. Beam position feedback system for the Advanced Photon Source

    International Nuclear Information System (INIS)

    Chung, Y.

    1993-01-01

    The Advanced Photon Source (APS) will implement both global and local beam position feedback systems to stabilize the particle and X-ray beams for the storage ring. The systems consist of 20 VME crates distributed around the ring, each running multiple digital signal processors (DSP) running at 4kHz sampling rate with a proportional, integral, and derivative (PID) control algorithm. The particle and X-ray beam position data is shared by the distributed processors through networked reflective memory. A theory of closed orbit correction using the technique of singular value decomposition (SVD) of the response matrix and simulation of its application to the APS storage ring will be discussed. This technique combines the global and local feedback systems and resolves the conflict among multiple local feedback systems due to local bump closure error. Maximum correction efficiency is achieved by feeding back the global orbit data to the local feedback systems. The effect of the eddy current induced in the relatively thick (1/2 inch) vacuum chamber by the AC corrector magnet field for local feedback systems is compensated by digital filters. Results of experiments conducted on the X-ray ring of the National Synchrotron Light Source and the SPEAR at Stanford Synchrotron Radiation Laboratory will also be presented

  2. DC proton beam measurements in a single-solenoid low-energy beam transport system

    International Nuclear Information System (INIS)

    Stevens, R.R. Jr.; Schafstall, P.; Schneider, J.D.; Sherman, J.; Zaugg, T.; Taylor, T.

    1994-01-01

    High current, CW proton accelerators are being considered for a number of applications including disposition of nuclear wastes, reduction of fissionable nuclear material inventories, safe production of critical nuclear materials, and energy production. All these applications require the development of high current, reliable, hydrogen ion injectors. In 1986, a program using CW RFQ technology was undertaken at CRL in collaboration with LANL and was continued there until 1993. During this time, an accelerator was built which produced 600 keV, 75 mA and 1,250 keV, 55 mA CW proton beams. The present program at Los Alamos using this accelerator is aimed at continuing the CRL work to demonstrate long-term reliability. In the present work, the authors are seeking to determine the optimal match to and the current limit of the 1,250-keV RFQ. This paper discusses the characterization of the 50 keV beams at the exit of the single-solenoid LEBT and presents both the experimental measurements and the beam simulations done to model this system

  3. Interference-aware random beam selection for spectrum sharing systems

    KAUST Repository

    Abdallah, Mohamed M.

    2012-09-01

    Spectrum sharing systems have been introduced to alleviate the problem of spectrum scarcity by allowing secondary unlicensed networks to share the spectrum with primary licensed networks under acceptable interference levels to the primary users. In this paper, we develop interference-aware random beam selection schemes that provide enhanced throughput for the secondary link under the condition that the interference observed at the primary link is within a predetermined acceptable value. For a secondary transmitter equipped with multiple antennas, our schemes select a random beam, among a set of power- optimized orthogonal random beams, that maximizes the capacity of the secondary link while satisfying the interference constraint at the primary receiver for different levels of feedback information describing the interference level at the primary receiver. For the proposed schemes, we develop a statistical analysis for the signal-to-noise and interference ratio (SINR) statistics as well as the capacity of the secondary link. Finally, we present numerical results that study the effect of system parameters including number of beams and the maximum transmission power on the capacity of the secondary link attained using the proposed schemes. © 2012 IEEE.

  4. An automatic beam focusing system for MeV protons

    Science.gov (United States)

    Udalagama, C. N. B.; Bettiol, A. A.; van Kan, J. A.; Teo, E. J.; Breese, M. B. H.; Osipowicz, T.; Watt, F.

    2005-04-01

    An automatic focusing system for MeV protons has been developed. The focusing system utilises rapid real time proton induced secondary electron imaging of a calibration grid coupled with a modified Gaussian fit in order to take into account the enhanced secondary electron signal from the calibration grid edge. The focusing system has been successfully applied to MeV protons focused using a coupled triplet configuration of magnetic quadrupole lenses (Oxford triplet). Automatic beam focusing of a coarse beamspot of approximately (5 × 3.5) micrometres in the X and Y directions to a sub-micrometre beamspot of approximately (0.7 × 0.6) micrometers was achieved at a beam current of about 50 pA.

  5. Beam profile monitor system for the bevalac transfer line

    International Nuclear Information System (INIS)

    Stover, G.

    1985-01-01

    Incorporated in the current Bevalac transfer line upgrade project is a proposal for a new electronic beam monitoring system. It will be designed to amplify, convert, and transmit the signals of twelve 16 by 16 multi-wire grids to a central computer located in the Bevatron control room. Each station will contain interface amplifiers and a local microprocessor to convert wire grid currents into digitized values which will then be transmitted via a serial data channel to the main computer. The system will have a large dynamic range (1 nano to 1 milli-ampere of beam current), be designed for distributed operation, and will be easily expandable. This paper describes the basic electronic hardware and software components of the proposed system

  6. An automatic beam focusing system for MeV protons

    International Nuclear Information System (INIS)

    Udalagama, C.N.B.; Bettiol, A.A.; Kan, J.A. van; Teo, E.J.; Breese, M.B.H.; Osipowicz, T.; Watt, F.

    2005-01-01

    An automatic focusing system for MeV protons has been developed. The focusing system utilises rapid real time proton induced secondary electron imaging of a calibration grid coupled with a modified Gaussian fit in order to take into account the enhanced secondary electron signal from the calibration grid edge. The focusing system has been successfully applied to MeV protons focused using a coupled triplet configuration of magnetic quadrupole lenses (Oxford triplet). Automatic beam focusing of a coarse beamspot of approximately (5 x 3.5) micrometres in the X and Y directions to a sub-micrometre beamspot of approximately (0.7 x 0.6) micrometers was achieved at a beam current of about 50 pA

  7. DYNAMIC ANALYSIS OF HYDRAULIC DRIVE OF TILTING PLATFORM MECHANISM OF DUMP TRUCK

    Directory of Open Access Journals (Sweden)

    P. Kishkevich

    2011-01-01

    Full Text Available Object of research – hydraulic drive of tilting platform mechanism of dump truck. We pro-pose a dynamic model of the hydraulic system. The model takes into account the cyclic operation (lifting, lowering the platform.

  8. DYNAMIC ANALYSIS OF HYDRAULIC DRIVE OF TILTING PLATFORM MECHANISM OF DUMP TRUCK

    OpenAIRE

    P. Kishkevich; A. Safonau; I. Selivonchik; P. Bartosh

    2011-01-01

    Object of research – hydraulic drive of tilting platform mechanism of dump truck. We pro-pose a dynamic model of the hydraulic system. The model takes into account the cyclic operation (lifting, lowering the platform).

  9. Dose-homogeneity Driven Beam Delivery System Performance Requirements for MedAustron

    CERN Document Server

    Palm, M; Moser, F; Benedikt, M

    2011-01-01

    MedAustron [1], the Austrian hadron therapy center is currently under construction. Irradiation will be performed using active scanning with proton and carbon ion pencil beams. Major beam delivery system contributors to dose heterogeneities are evaluated: beam position, beam size and spot weight errors. Their individual and combined effect on the dose distribution is quantified, using semianalytical models of lateral beam spread in the nozzle and target and depth-dose curves for protons and carbon ions. Deduced requirements on critical parts of the beam delivery system are presented. Preventive and active methods to suppress the impact of beam delivery inaccuracies are proposed.

  10. Electron beam cyclotron instability of a beam-plasma system in a magnetic beach

    Energy Technology Data Exchange (ETDEWEB)

    Varandas, C.A.F.; Cabral, J.A.C.

    1988-09-01

    We study the development of the electron cyclotron instability of a beam-plasma system in a magnetic beach. Beaches of positive as well as of negative B-field gradient are considered. The frequency spectrum shows either one or two cyclotron peaks depending on the B-field inhomogeneity. The central frequencies of these peaks, as opposed to their amplitudes, are independent of both the axial and radial positions of the measuring probe. The experimental results are interpreted in terms of the analysis of the instability frequency spectrum theoretically constructed from the space-time evolution, in the WKB approximation, of unstable electron cyclotron waves.

  11. Fast 3D multiple fan-beam CT systems

    Science.gov (United States)

    Kohlbrenner, Adrian; Haemmerle, Stefan; Laib, Andres; Koller, Bruno; Ruegsegger, Peter

    1999-09-01

    Two fast, CCD-based three-dimensional CT scanners for in vivo applications have been developed. One is designed for small laboratory animals and has a voxel size of 20 micrometer, while the other, having a voxel size of 80 micrometer, is used for human examinations. Both instruments make use of a novel multiple fan-beam technique: radiation from a line-focus X-ray tube is divided into a stack of fan-beams by a 28 micrometer pitch foil collimator. The resulting wedge-shaped X-ray field is the key to the instrument's high scanning speed and allows to position the sample close to the X-ray source, which makes it possible to build compact CT systems. In contrast to cone- beam scanners, the multiple fan-beam scanner relies on standard fan-beam algorithms, thereby eliminating inaccuracies in the reconstruction process. The projections from one single rotation are acquired within 2 min and are subsequently reconstructed into a 1024 X 1024 X 255 voxel array. Hence a single rotation about the sample delivers a 3D image containing a quarter of a billion voxels. Such volumetric images are 6.6 mm in height and can be stacked on top of each other. An area CCD sensor bonded to a fiber-optic light guide acts as a detector. Since no image intensifier, conventional optics or tapers are used throughout the system, the image is virtually distortion free. The scanner's high scanning speed and high resolution at moderately low radiation dose are the basis for reliable time serial measurements and analyses.

  12. Particle beam digital phase control system for COSY

    International Nuclear Information System (INIS)

    Schnase, A.

    1994-02-01

    Particle accelerators require that the orbit of the charged particles in the vacuum chamber is controlled to fulfil narrow limits. This is done by magnetic deflection systems and exactly adjusted rf-acceleration. Up to now the necessary control-functions were realised with analogue parts. This work describes a digital phase control system that works in real time and is used with the proton accelerator COSY. The physical design of the accelerator sets the accuracy-specifications of the revolution frequency (<1 Hz in the whole range from 400 kHz to 1.6 MHz), the phase-difference (<0.01 ), the signal-to-noise-ratio (<-60 dBc) and the update rate (<1 μs) of the parameters. In a typical operation the beam is first bunched and synchronised to the reference oscillator. After that the beam influences the rf-system with the help of charge detectors and now the rf-systems will be synchronised with the bunched beam. This control-loop is modelled and simulated with PSPICE. (orig.)

  13. Beam vacuum system of Brookhaven's muon storage ring

    International Nuclear Information System (INIS)

    Hseuth, H.C.; Snydstrup, L.; Mapes, M.

    1995-01-01

    A storage ring with a circumference of 45 m is being built at Brookhaven to measure the g-2 value of the muons to an accuracy of 0.35 ppm.. The beam vacuum system of the storage ring will operate at 10 -7 Torr and has to be completely non-magnetic. It consists of twelve sector chambers. The chambers are constructed of aluminum and are approximately 3.5 m in length with a rectangular cross-section of 16.5 cm high by 45 cm at the widest point. The design features, fabrication techniques and cleaning methods for these chambers are described. The beam vacuum system will be pumped by forty eight non-magnetic distributed ion pumps with a total pumping speed of over 2000 ell/sec. Monte Carlo simulations of the pressure distribution in the muon storage region are presented

  14. Pattern data handling system for an electron beam exposure system

    International Nuclear Information System (INIS)

    Berrian, D.W.; Ward, B.W.

    1985-01-01

    A beam is blanked over a rectangular area by storing beam blanking data in a bit map memory having data words of n bits. An address counter is loaded with the x-coordinate of the location of the rectangle and inhibited (by word counter) from counting after advancing through a number of addresses corresponding to the length of the rectangle. Mask bits whose position determines the y-coordinate of the location of the rectangle and whose number determines the width of the rectangle are loaded into a mask latch having n bit locations each with an output coupled to write enable inputs of the memory corresponding to the n bits of the data words in the memory. As the address counter advances through the number of addresses corresponding to the length of the rectangle, data describing the rectangle is stored in the memory without altering masked parts of previously stored blanking data. (author)

  15. Conceptual design for the ZEPHYR neutral-beam injection system

    International Nuclear Information System (INIS)

    Cooper, W.S.; Elischer, V.P.; Goldberg, D.A.; Hopkins, D.B.; Jacobson, V.L.; Lou, K.H.; Tanabe, J.T.

    1981-03-01

    In June 1980, the Lawrence Berkeley Laboratory began a conceptual design study for a neutral beam injection system for the ZEPHYR ignition tokamak proposed by the Max-Planck-Institut fur Plasmaphysik in Garching, Germany. The ZEPHYR project was cancelled, and the LBL design effort concluded prematurely in January 1981. This report describes the conceptual design as it existed at that time, and gives brief consideration to a schedule, but does not deal with costs

  16. Conceptual design for the ZEPHYR neutral-beam injection system

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, W.S.; Elischer, V.P.; Goldberg, D.A.; Hopkins, D.B.; Jacobson, V.L.; Lou, K.H.; Tanabe, J.T.

    1981-03-01

    In June 1980, the Lawrence Berkeley Laboratory began a conceptual design study for a neutral beam injection system for the ZEPHYR ignition tokamak proposed by the Max-Planck-Institut fur Plasmaphysik in Garching, Germany. The ZEPHYR project was cancelled, and the LBL design effort concluded prematurely in January 1981. This report describes the conceptual design as it existed at that time, and gives brief consideration to a schedule, but does not deal with costs.

  17. Neutral beam interlock system on TFTR using infrared pyrometry

    International Nuclear Information System (INIS)

    Medley, S.S.; Kugel, H.W.; Kozub, T.A.; Lowrance, J.L.; Mastrocola, V.; Renda, G.; Young, K.M.

    1986-01-01

    Although the region of the Tokamak Fusion Test Reactor (TFTR) vacuum vessel wall which is susceptible to damage by neutral beam strike is armored with a mosaic of TiC-clad POCO graphite tiles, at power deposition levels above 2.5 kW/cm 2 the armor surface temperature exceeds 1200 0 C within 250 ms, and itself becomes susceptible to damage. In order to protect the wall armor, a neutral beam interlock system based on infrared pyrometry measurement of the armor surface temperature was installed on TFTR. For each beamline, a three-fiber-optic telescope views three areas of --30 cm diameter centered on the armor hot spots for the three ion sources. Each signal is fiber-optic coupled to a remote 900-nm pyrometer which feeds analog signals to the neutral beam interrupt circuits. The pyrometer interlock system is designed to interrupt each of the 12 ion sources independently within 10 ms of the temperature exceeding a threshold which can be set in the range of 500--2300 0 C. A description of the pyrometer interlock system and its performance will be presented

  18. Non-thermal fusion in a beam plasma system

    International Nuclear Information System (INIS)

    Santini, F.

    2006-01-01

    The problem of producing fusion power with low neutron emission has been debated in the past in the framework of the magnetic confinement fusion research. Proposals are still being renewed to use advanced fuels in various plasma systems. Since today's toroidal devices cannot support plasma conditions suitable for a large fusion production with such fuels, new concepts and configurations have been studied, where the plasma components are not in a thermal equilibrium. Here, a system of a neutral beam injected into a confined plasma is considered where fusion is produced only between the beam and plasma ions. The collisional slowing down of the beam into the plasma is described by a fluid model. General considerations in this model allow conditions to be found for the fusion-produced power to breakeven against the power needed to sustain the system itself. These conditions are only necessary since the nuclear power is maximized in the present analysis by using favourable assumptions. Nevertheless, the results for different advanced fuels indicate again the very high difficulty of getting a net power produced by the fusion of such fuels, unless the plasma target temperature reaches very high and unrealistic values

  19. Two-Pipe Chilled Beam System for Both Cooling and Heating of Office Buildings

    DEFF Research Database (Denmark)

    Afshari, Alireza; Gordnorouzi, Rouzbeh; Hultmark, Göran

    2013-01-01

    Simulations were performed to compare a conventional 4-pipe chilled beam system and a 2-pipe chilled beam system. The objective was to establish requirements, possibilities and limitations for a well-functioning 2-pipe chilled beam system for both cooling and heating of office buildings. The buil...

  20. An electron beam imaging system for quality assurance in IORT

    Science.gov (United States)

    Casali, F.; Rossi, M.; Morigi, M. P.; Brancaccio, R.; Paltrinieri, E.; Bettuzzi, M.; Romani, D.; Ciocca, M.; Tosi, G.; Ronsivalle, C.; Vignati, M.

    2004-01-01

    Intraoperative radiation therapy is a special radiotherapy technique, which enables a high dose of radiation to be given in a single fraction during oncological surgery. The major stumbling block to the large-scale application of the technique is the transfer of the patient, with an open wound, from the operating room to the radiation therapy bunker, with the consequent organisational problems and the increased risk of infection. To overcome these limitations, in the last few years a new kind of linear accelerator, the Novac 7, conceived for direct use in the surgical room, has become available. Novac 7 can deliver electron beams of different energies (3, 5, 7 and 9 MeV), with a high dose rate (up to 20 Gy/min). The aim of this work, funded by ENEA in the framework of a research contract, is the development of an innovative system for on-line measurements of 2D dose distributions and electron beam characterisation, before radiotherapy treatment with Novac 7. The system is made up of the following components: (a) an electron-light converter; (b) a 14 bit cooled CCD camera; (c) a personal computer with an ad hoc written software for image acquisition and processing. The performances of the prototype have been characterised experimentally with different electron-light converters. Several tests have concerned the assessment of the detector response as a function of impulse number and electron beam energy. Finally, the experimental results concerning beam profiles have been compared with data acquired with other dosimetric techniques. The achieved results make it possible to say that the developed system is suitable for fast quality assurance measurements and verification of 2D dose distributions.

  1. Monitoring the extracted proton beam at the SPS

    CERN Multimedia

    CERN PhotoLab

    1977-01-01

    Fluorescent screens in front of the target positions allow a precise adjustement in front of them. A similar photo was recorded at the beam dump at the beam injection into the SPS, see Weekly Bulletin of April 1976.

  2. European Anti-dumping Law and China

    Directory of Open Access Journals (Sweden)

    Piet Eeckhout

    1997-04-01

    Full Text Available The paper examines recent developments in the European Union's anti-dumping policy, as it is applied towards China. It concentrates on recent court cases involving dumping from China and on the basic non-market economy issue. The author essentially argues that the European Union's policy does not take account sufficiently of China's development towards a market economy, and that there are various legal flaws in the way the policy is applied.

  3. Performance and LHC beam stability issue related to Q/Q' diagnostics and feedback systems

    CERN Document Server

    Steinhagen, Ralph J

    2010-01-01

    The baseline tune (Q) and chromaticity (Q’) diagnostics and associated feedback systems played a crucial role during the LHC commissioning, in establishing circulating beam, the first ramps and their fill-to-fill feed-forward correction. Early on, they also allowed to identify issues such as the residual tune stability, beam spectrum interferences and beam-beam effects – all of which may impact beam lifetimes and thus need to be addressed in view of nominal LHC operation.

  4. Design of the ITER Neutral Beam injectors

    International Nuclear Information System (INIS)

    Hemsworth, R.S.; Feist, J.; Hanada, M.; Heinemann, B.; Inoue, T.; Kuessel, E.; Kulygin, V.; Krylov, A.; Lotte, P.; Miyamoto, K.; Miyamoto, N.; Murdoch, D.; Nagase, A.; Ohara, Y.; Okumura, Y.; Pamela, J.; Panasenkov, A.; Shibata, K.; Tanii, M.

    1996-01-01

    This paper describes the Neutral Beam Injection system which is presently being designed in Europe, Japan and Russia, with co-ordination by the Joint Central Team of ITER at Naka, Japan. The proposed system consists of three negative ion based neutral injectors, delivering a total of 50 MW of 1 MeV D 0 to the ITER plasma for pulse length of ≥1000 s. The injectors each use a single caesiated volume arc discharge negative ion source, and a multi-grid, multi-aperture accelerator, to produce about 40 A of 1 MeV D - . This will be neutralized in a sub-divided gas neutralizer, which has a conversion efficiency of about 60%. The charged fraction of the beam emerging from the neutralizer is dumped in an electrostatic residual ion dump. A water cooled calorimeter can be moved into the beam path to intercept the neutral beam, allowing commissioning of the injector independent of ITER. copyright 1996 American Institute of Physics

  5. Electron Beam Final Focus System For Thomson Scattering At Elbe

    CERN Document Server

    Krämer, J.M.; Bødkera, F.; Irman, A.; Jochmann, A.; Kristensena, J.P.; Lehnert, U.; Michel, P.; Schramm, U.; 10.1016/j.nima.2015.10.067

    2016-01-01

    The design of an electron beam final focus system (FFS) aiming for high-flux laser-Thomson backscattering X-ray sources at ELBE is presented. A telescope system consisting of four permanent magnet based quadrupoles was found to have significantly less chromatic aberrations than a quadrupole doublet or triplet as commonly used. Focusing properties like the position of the focal plane and the spot size are retained for electron beam energies between 20 and 30 MeV by adjusting the position of the quadrupoles individually on a motorized stage. The desired ultra-short electron bunches require an increased relative energy spread up to a few percent and, thus, second order chromatic effects must be taken into account. We also present the design and test results of the permanent magnet quadrupoles. Adjustable shunts allow for correction of the field strength and compensation of deviations in the permanent magnet material. For a beam emittance of 13 mm mrad, we predict focal spot sizes of about 40 μm (rms) and diverg...

  6. Electron beam final focus system for Thomson scattering at ELBE

    CERN Document Server

    Krämer, J.M.; Bødker, F.; Irman, A.; .Jochmann A.; Kristensen, J.P.; Lehnert U., HZDR; Michel, P.; Schrammb, U.; 10.1016/j.nima.2015.10.067

    2016-01-01

    The design of an electron beam final focus system (FFS) aiming for high-flux laser-Thomson backscattering X-ray sources at ELBE is presented. A telescope system consisting of four permanent magnet based quadrupoles was found to have significantly less chromatic aberrations than a quadrupole doublet or triplet as commonly used. Focusing properties like the position of the focal plane and the spot size are retained for electron beam energies between 20 and 30 MeV by adjusting the position of the quadrupoles individually on a motorized stage. The desired ultra-short electron bunches require an increased relative energy spread up to a few percent and, thus, second order chromatic effects must be taken into account. We also present the design and test results of the permanent magnet quadrupoles. Adjustable shunts allow for correction of the field strength and compensation of deviations in the permanent magnet material. For a beam emittance of 13 mm mrad, we predict focal spot sizes of about 40 μm (rms) and diverg...

  7. Electronics and Calibration system for the CMS Beam Halo Monitor

    CERN Document Server

    Tosi, Nicolo

    2014-01-01

    In the context of increasing luminosity of LHC, it will be important to accurately measure the Machine Induced Background. A new monitoring system will be installed in the CMS cavern for measuring the beam background at high radius. This detector is composed of synthetic quartz Cherenkov radiators, coupled to fast photomultiplier tubes (PMT). The readout chain of this detector will make use of many components developed for the Phase 1 upgrade to the CMS Hadron Calorimeter electronics, with a dedicated firmware and readout adapted to the beam monitoring requirements. The PMT signal will be digitized by a charge integrating ASIC (QIE10), providing both the signal rise time and the charge integrated over one bunch crossing.The backend electronics will record bunch-by-bunch histograms, which will be published to CMS and the LHC using the newly designed CMS beam instrumentation specific DAQ. A calibration monitoring system has been designed to generate triggered pulses of light to monitor the efficiency of the sys...

  8. Detection systems for radioactive ion beams; Systeme de detection en ions radioactifs

    Energy Technology Data Exchange (ETDEWEB)

    Savajols, H

    2002-07-01

    Two main methods are used to produce radioactive ion beams: -) the ISOL method (isotope separation on-line) in which the stable beam interacts with a thick target, the reaction products diffuse outside the target and are transferred to a source where they are ionized, a mass separator and a post-accelerator drive the selected radioactive ions to the right energy; -) the in-flight fragmentation method in which the stable beam interacts with a thin target, the reaction products are emitted from the target with a restricted angular distribution and a velocity close to that of the incident beam, the experimenter has to take advantage from the reaction kinetics to get the right particle beam. Characteristic time is far longer with the ISOL method but the beam intensity is much better because of the use of a post-accelerator. In both cases, the beam intensity is lower by several orders of magnitude than in the case of a stable beam. This article presents all the constraints imposed by radioactive beams to the detection systems of the reaction products and gives new technical solutions according to the type of nuclear reaction studied. (A.C.)

  9. Study of Electron Beam Curing Process Using Epoxy Resin System

    International Nuclear Information System (INIS)

    Nishitsuji, D. A.

    2006-01-01

    The competition among industries in the current globalization system has required a systematic cost reduction without affecting the quality of the final product. This fact has encouraged the use of new technologies application on productive process, especially on polymeric composites, to assure the competitiveness. The possibility of producing a new type of carbon fiber reinforced composite by radiation process with excellent thermal and mechanical properties, has been researched since 90's and it can be a potential application in aerospace, marine and automobile industries. The polymeric composites cured by thermal process (furnace or autoclave) are an example of long curing cycles, which requires time and energy consumption. Electron beam curing technology allows the process at room temperature and reduces curing time; consequently, it becomes the main difference of this technology over thermal curing process. The aim of this work was to study electron beam curable epoxy formulation for filament winding process, as well as to investigate the electron beam curing process parameters using a DC 1500/25 - Job 188 Dynamitron model linear accelerator as radiation source, with 0.5 to 1.5 MeV, 0.1 to 25 mA and 60 to 120 cm scanning electron beam. The resin system consists of commercial epoxy resin (diglycidyl ether of bisphenol A - DGEBA) and cationic initiator (diaryliodonium hexafluoantimonate) and the polymerization carried out at room temperature with controlled dose rate. Thermal post cure took part of the process to improve the degree of cure and glass transition temperature (Tg) similar to thermal curable resin properties

  10. Computer control of the beam transport system of the Chalk River electron test accelerator

    International Nuclear Information System (INIS)

    McMichael, G.E.; Kidner, S.H.; Fraser, J.S.

    1977-05-01

    The beam transport system of the Chalk River Electron Test Accelerator comprises steering coils and solenoidal focusing magnets driven by voltage-programmed, current-regulated power supplies. This report describes the beam transport and beam diagnostics systems presently in use. The computer controls all beam transport magnets from a single, allocatable control knob. The system is currently being expanded to two knobs and two readouts. (author)

  11. Design of beam transport system for the 14 UD pelletron at TIFR

    International Nuclear Information System (INIS)

    Prasad, K.G.; Sharma, R.P.

    1986-01-01

    The beam transport system of the pelletron accelerator under installation at the Tata Institute of Fundamental Research at Bombay is described in brief. Results of the study of the ion trajectories in the three sections of the system, namely low energy beam transport arrangement, high energy beam transport system, switching magnet and quadrapole lenses are described. Study was done to optimize the parameters of various components and their location along the beam path. (M.G.B.)

  12. Long radiation detector system for beam loss monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Balsamo, J.; Fewell, N.M.; Klein, J.D.; Witkover, R.L.

    1977-01-01

    The Long Radiation Monitor (LRM) system installed at the 200 MeV linac at Brookhaven National Laboratory is described. This system allows observation of both the spatial and temporal character of the losses in the linac and its transport lines. An array of large diameter gas filled coaxial cables are used as extended ion chambers to detect the losses. The output signals are available as a histogram, video waveforms, and numerical data via the computer. A fast beam interrupt is also provided. The detector characteristics and details of the processing electronics are presented. Results of studies of longitudinal, steering and focusing losses are described.

  13. Long radiation detector system for beam loss monitoring

    International Nuclear Information System (INIS)

    Balsamo, J.; Fewell, N.M.; Klein, J.D.; Witkover, R.L.

    1977-01-01

    The Long Radiation Monitor (LRM) system installed at the 200 MeV linac at Brookhaven National Laboratory is described. This system allows observation of both the spatial and temporal character of the losses in the linac and its transport lines. An array of large diameter gas filled coaxial cables are used as extended ion chambers to detect the losses. The output signals are available as a histogram, video waveforms, and numerical data via the computer. A fast beam interrupt is also provided. The detector characteristics and details of the processing electronics are presented. Results of studies of longitudinal, steering and focusing losses are described

  14. Geometry calibration method for a cone-beam CT system.

    Science.gov (United States)

    Yang, Hongkai; Kang, Kejun; Xing, Yuxiang

    2017-05-01

    The positioning accuracy of each component is important to ensure the image quality of cone-beam CT. However, accurate positioning is not easy and requires experience and time. The option is to calibrate the geometric parameters and then plug them into a reconstruction algorithm which is the preferred solution in practice. In this case, the image quality is determined by the accuracy and precision of the calibration method. This work describes a method to independently calibrate an imaging system in each pose (projection angle) for a cone-beam CT with a nonideal circular trajectory. The calibration method uses a phantom with 12 beads on 2 planes that are observed on the radiographic images. This pose-independent calibration method (PIC) can decorrelate the relationships among the geometric parameters so that the parameters can be estimated one-by-one. This simplifies the calibration process. Besides the pose-independent calibration method, this paper also describes an extended calibration method with additional constraints on the system geometry. Both methods are validated with numerical simulations and then experimentally on a practical system with a scanning object loosely supported by rotating wheels. The object rotates during the CT data acquisition. The angular and pose information of the CT system are not accurately known a priori in this case. The numerical simulations and the experiments both provide satisfactory results. The relative error of the calibrated source-to-detector distance in the simulation is less than 0.1%. The errors in the calibrated roll, pitch, and yaw angles are less than 0.04°. A sensitivity study using various bead position uncertainties in random directions shows that the pose-independent calibration method is robust to measurement errors. Tests were also done with a nonideal circular trajectory for further validation. Images reconstructed using the geometric parameters from both the pose-independent and the extended calibration

  15. Gaussian-beam-mode analysis of multibeam quasi-optical systems

    Science.gov (United States)

    Murphy, J. A.; Withington, Stafford

    1998-07-01

    In this paper we discuss the extension of Gaussian beam analysis to multi-beam quasi-optical systems. The normal approach taken in analyzing the propagation of multiple beams is to ray trace the optical axes of the individual beams and then superimpose the beam evolution of the on-axis beam. This is a rather inelegant and cumbersome process. We show how an efficient paraxial description of off-axis beams using Gaussian beam modes can be developed. The computational feasibility of the beam mode description clearly depends on finding an on-axis mode set in terms of which any off-axis beam can be approximated by a modal sum of modest size. We show how the optimum choice is made, and illustrate the power of the approach with an example.

  16. Beam Pipe HOM Absorber for 750 MHz RF Cavity Systems

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Rolland; Neubauer, Michael

    2014-10-29

    This joint project of Muons, Inc., Cornell University and SLAC was supported by a Phase I and Phase II grant monitored by the SBIR Office of Science of the DOE. Beam line HOM absorbers are a critical part of future linear colliders. The use of lossy materials at cryogenic temperatures has been incorporated in several systems. The design in beam pipes requires cylinders of lossy material mechanically confined in such a way as to absorb the microwave energy from the higher-order modes and remove the heat generated in the lossy material. Furthermore, the potential for charge build-up on the surface of the lossy material requires the conductivity of the material to remain consistent from room temperature to cryogenic temperatures. In this program a mechanical design was developed that solved several design constraints: a) fitting into the existing Cornell load vacuum component, b) allowing the use of different material compositions, c) a thermal design that relied upon the compression of the lossy ceramic material without adding stress. Coating experiments were performed that indicated the design constraints needed to fully implement this approach for solving the charge build-up problem inherent in using lossy ceramics. In addition, the ACE3P program, used to calculate the performance of lossy cylinders in beam pipes in general, was supported by this project. Code development and documentation to allow for the more wide spread use of the program was a direct result of this project was well.

  17. Beam monitors and transverse feedback system of TRISTAN Main Ring

    International Nuclear Information System (INIS)

    Ieiri, T.; Ishii, H.; Kishiro, J.; Mizumachi, Y.; Mori, K.; Nakajima, K.; Ogata, A.; Shintake, T.; Tejima, M.

    1987-01-01

    The construction of 30 GeV TRISTAN Main Ring (MR) started in 1983 soon after the commissioning of 8 GeV Accumulation Ring (AR). The authors prepared 392 position monitors, 6 synchrotron radiation monitors, 9 screen monitors, 2 DCCT's, 3 scrapers, 12 bunch monitors, transverse feedback systems for two beams and DC separators. Since the required monitoring devices of AR and MR are almost the same, the experiences in AR were very useful in the design of MR monitors. However, machine parameters of two rings are very different and the authors had to review the performance of each item. From the monitor point of view the most important is the difference of revolution frequency; 794.6 kHz for AR and 99.33 kHz for MR. This means that average beam current of MR is 1/8 as small as AR current with the same bunch number and intensity. Therefore, the sensitivity of each monitor must be better in MR. The second difference is that MR should be used as a collider from the beginning. Therefore they must prepare for multi-beam and multi-bunch operation

  18. The RF beam control system for the Brookhaven AGS synchrotron

    Energy Technology Data Exchange (ETDEWEB)

    Brennan, J.M.

    1992-01-01

    The new 1.5 GeV Booster synchrotron completes the injector chain for the Relativistic Heavy Ion Collider, RHIC. It enables the AGS to accelerate all heavy ions to 14 GeV/c for collider operation and also in the intensity of the AGS for fixed-target experiments by a factor of four. The ultra-high vacuum enables acceleration of partially stripped ions from the Tandem Van de Graaff to energies sufficient for complete stripping. For high intensities, it accelerates the 200 MeV linac beam in four batches of three bunches per AGS cycle. At 1.5 {times} 10{sup 13} protons per batch, it has the same space charge tune spread as the AGS at 200 MeV. This variety of applications means the Booster must accommodate a very wide range of particle masses and intensities. Since it operates in a Pulse-by-Pulse Modulation mode at 7.5 Hz, the computer controlled functions of time and magnetic field, and the 64 timing triggers of the beam control system take on unique values for each of four PPM users. Beams of {sup 197}Au{sup +33} ions and protons have been accelerated in the same PPM cycle.

  19. The RF beam control system for the Brookhaven AGS synchrotron

    Energy Technology Data Exchange (ETDEWEB)

    Brennan, J.M.

    1992-09-01

    The new 1.5 GeV Booster synchrotron completes the injector chain for the Relativistic Heavy Ion Collider, RHIC. It enables the AGS to accelerate all heavy ions to 14 GeV/c for collider operation and also in the intensity of the AGS for fixed-target experiments by a factor of four. The ultra-high vacuum enables acceleration of partially stripped ions from the Tandem Van de Graaff to energies sufficient for complete stripping. For high intensities, it accelerates the 200 MeV linac beam in four batches of three bunches per AGS cycle. At 1.5 {times} 10{sup 13} protons per batch, it has the same space charge tune spread as the AGS at 200 MeV. This variety of applications means the Booster must accommodate a very wide range of particle masses and intensities. Since it operates in a Pulse-by-Pulse Modulation mode at 7.5 Hz, the computer controlled functions of time and magnetic field, and the 64 timing triggers of the beam control system take on unique values for each of four PPM users. Beams of {sup 197}Au{sup +33} ions and protons have been accelerated in the same PPM cycle.

  20. Characteristics of Local Modulation Beam Propagating through Spatial Filter System

    Directory of Open Access Journals (Sweden)

    Kewei You

    2018-01-01

    Full Text Available As local defects may significantly harm beam quality and affect safe operation, a systematic analysis of the ability of a spatial filter to alleviate these adverse effects is required. Thus, the evolutional characteristics of a beam modulated by a local defect propagating through a spatial filter system at an image reply plane and a downstream plane are analyzed in detail. Modulation stripes appear at the image reply plane; these are caused by the pinhole cutoff effect. The modulation degree increases with increasing defect size. The maximum intensification factor can reach 3.2 under certain conditions. Thus, the defect size should be restricted to a reasonable size for safe operation with a specified pinhole size. Moreover, a maximal value appears at the downstream plane, and the intensity enhances with increasing defect size. To ensure beam quality, the maximum allowable defect size and angle of the spatial filter should meet special constraints. The maximum allowable defect size is calculated based on practical configuration parameters.

  1. A system for measuring the energy spread of an accelerated beam

    International Nuclear Information System (INIS)

    Wilkerson, J.F.; Ludwig, E.J.; Clegg, T.B.; Anderson, R.E.

    1987-01-01

    A system has been implemented to monitor directly the energy spread of analyzed beams from a tandem electrostatic accelerator. The dispersion of a deflection magnet in the beam handling system is used to transform the energy distribution into a spatial distribution, which then is measured by electrostatically sweeping the spatially extended beam across a narrow slit. (orig.)

  2. Hydrological investigations on an overburden dump in the Borken brown coal district, North Hessen

    International Nuclear Information System (INIS)

    Wolff, P.; Latif, A.

    1992-01-01

    After a general hydrological investigation of the Dosenberg overburden dump in North Hessen, a climatic water balance is established for the main vegetation periods of the years 1989, 1990, and 1991. This is followed by a description of the investigations of water levels of the plateau pools and time curves of water levels of observation holes drilled into the dump plateau. In all, the findings suggest that in the period under investigation, which comprised three draught years in sequence, the dump was largely an independent hydrological system. In this period, no significant discharge of water from the 'Dosenberg ecosystem' into the surrounding area occurred, i.e. the overburden dumps had no effect on the surrounding cultivated land and bodies of water. This may be different in wet years. On the other hand, the prevailing climate conditions give cause to assume that no negative effects need be expected. The investigation will be continued. (orig.) [de

  3. A high intensity beam handling system at the KEK-PS new experimental hall

    International Nuclear Information System (INIS)

    Tanaka, K.H.; Minakawa, M.; Yamanoi, Y.

    1991-01-01

    We would like to summarize newly developed technology for handling high-intensity beams. This was practically employed in the beam-handling system of primary protons at the KEK-PS new experimental hall. (author)

  4. Multi-beam backscatter image data processing techniques employed to EM 1002 system

    Digital Repository Service at National Institute of Oceanography (India)

    Fernandes, W.A.; Chakraborty, B.

    to compensate outer-beam backscatter strength data in such a way that the effect of angular backscatter strength is removed. In this work we have developed backscatter data processing techniques for EM1002 multi-beam system...

  5. Medium and high energy electron beam processing system

    Energy Technology Data Exchange (ETDEWEB)

    Kashiwagi, Masayuki [Nissin-High Voltage Co., Ltd., Kyoto (Japan)

    2003-02-01

    Electron Beam Processing System (EPS) is a useful and powerful tool for industrial irradiation process. The specification of EPS is decided by consideration to irradiate what material with how thick and wide, how much dose, how to handle, in what atmosphere. In designing an EPS, it is necessary to consider safety measure such as x-ray shielding, ozone control and interlock system. The initial costs to install typical EPS are estimated for acceleration voltages from 500 kV to 5 MV, including following items; those are electron beam machine, x-ray shielding, auxiliary equipment, material handling, survey for installation, ozone exhaust duct, cooling water system, wiring and piping. These prices are reference only because the price should be changed for each case. The price of x-ray shielding should be changed by construction cost. Auxiliary equipment includes window, cooling blower, ozone exhaust blower and SF6 gas handling equipment. In installation work at site, actual workers of 3 - 4 persons for 2 months are necessary. Material handling system is considered only rolls provided in the shielding room as reference. In addition to the initial installation, operators and workers may be required to wear a personal radiation monitor. An x-ray monitor of suitable design should be installed outside the shield room to monitor x-ray level in the working area. (Y. Tanaka)

  6. DIII-D Neutral Beam control system operator interface

    International Nuclear Information System (INIS)

    Harris, J.J.; Campbell, G.L.

    1993-10-01

    A centralized graphical user interface has been added to the DIII-D Neutral Beam (NB) control systems for status monitoring and remote control applications. This user interface provides for automatic data acquisition, alarm detection and supervisory control of the four NB programmable logic controllers (PLC) as well as the Mode Control PLC. These PLCs are used for interlocking, control and status of the NB vacuum pumping, gas delivery, and water cooling systems as well as beam mode status and control. The system allows for both a friendly user interface as well as a safe and convenient method of communicating with remote hardware that formerly required interns to access. In the future, to enable high level of control of PLC subsystems, complete procedures is written and executed at the touch of a screen control panel button. The system consists of an IBM compatible 486 computer running the FIX DMACS trademark for Windows trademark data acquisition and control interface software, a Texas Instruments/Siemens communication card and Phoenix Digital optical communications modules. Communication is achieved via the TIWAY (Texas Instruments protocol link utilizing both fiber optic communications and a copper local area network (LAN). Hardware and software capabilities will be reviewed. Data and alarm reporting, extended monitoring and control capabilities will also be discussed

  7. Computerized treatment planning systems for external photon beam radiotherapy

    International Nuclear Information System (INIS)

    Evans, M.D.C.

    2005-01-01

    Computerized treatment planning systems (TPSs) are used in external beam radiotherapy to generate beam shapes and dose distributions with the intent to maximize tumour control and minimize normal tissue complications. Patient anatomy and tumour targets can be represented as 3-D models. The entire process of treatment planning involves many steps and the medical physicist is responsible for the overall integrity of the computerized TPS to accurately and reliably produce dose distributions and associated calculations for external beam radiotherapy. The planning itself is most commonly carried out by a dosimetrist, and the plan must be approved by a radiation oncologist before implementation in actual patient treatments. Treatment planning prior to the 1970s was generally carried out through the manual manipulation of standard isodose charts on to patient body contours that were generated by direct tracing or lead wire representation, and relied heavily on the judicious choice of beam weight and wedging by an experienced dosimetrist. The simultaneous development of computed tomography (CT), along with the advent of readily accessible computing power from the 1970s on, led to the development of CT based computerized treatment planning, providing the ability to view dose distributions directly superimposed upon a patient's axial anatomy. The entire treatment planning process involves many steps, beginning from beam data acquisition and entry into the computerized TPS, through patient data acquisition, to treatment plan generation and the final transfer of data to the treatment machine. Successive improvements in treatment planning hardware and software have been most notable in the graphics, calculation and optimization aspects of current systems. Systems encompassing the 'Virtual Patient' are able to display beam's eye views (BEVs) of radiation beams and digitally reconstructed radiographs (DRRs) for arbitrary dose distributions. Dose calculations have evolved from

  8. Nonlinear behaviors of a bounded electron beam-plasma system

    International Nuclear Information System (INIS)

    Iizuka, Satoru; Saeki, Koichi; Sato, Noriyoshi; Hatta, Yoshisuke

    1985-01-01

    Nonlinear developments of a bounded electron beam-plasma system including stationary electrons are investigated experimentally. A stable double layer is formed as a result of ion trapping in a growing negative potential dip induced by the Pierce instability above the current regime of the Buneman instability. In the in-between regime of the Buneman and Pierce instabilities, energetic ions are observed. This effective ion heating is caused by ion detrapping due to double-layer disruption, being consistent with computer simulation. (author)

  9. Tuning of the Compact Linear Collider Beam Delivery System

    CERN Document Server

    Garcia, H; Inntjore Levinsen, Y; Latina, A; Tomas, R; Snuverink, J

    2014-01-01

    Tuning the Compact Linear Collider (CLIC) BeamDelivery System (BDS), and in particular the Final Focus (FF), is a challenging task. In simulations without misalignments, the goal is to reach 120%o f the nominal luminosity target, in order to allow for 10% loss due to static imperfections, and another 10% loss from dynamic imperfections. Various approaches have been considered to correct the magnet misalignments, including 1-1 correction, Dispersion Free Steering (DFS), and several minimization methods utilizing multipole movers. In this paper we report on the recent advancements towards a feasible tuning approach that reaches the required luminosity target.

  10. Fault detection and protection system for neutral beam generators on the Neutral Beam Engineering Test Facility (NBETF)

    International Nuclear Information System (INIS)

    deVries, G.J.; Chesley, K.L.; Owren, H.M.

    1983-12-01

    Neutral beam sources, their power supplies and instrumentation can be damaged from high voltage sparkdown or from overheating due to excessive currents. The Neutral Beam Engineering Test Facility (NBETF) in Berkeley has protective electronic hardware that senses a condition outside a safe operating range and generates a response to terminate such a fault condition. A description of this system is presented in this paper. 8 references, 2 figures, 2 tables

  11. Methodology for monitoring land reclamation of coal mining dumps

    International Nuclear Information System (INIS)

    Val, C.; Gil, A.

    1994-01-01

    The main objective of reclaiming coal mining dumps is to create a stable and self-sustaining land surface that can, in the long term, be put to some productive use. The relationship that is established between the soil and vegetation is the starting point for the newly created ecosystem to enter into a dynamic evolution. In order to know this evolution, it is necessary to develop a methodology for monitoring systematically the reclaimed surfaces. This monitoring methodology should make it feasible to continuously evaluate the obtained results and serve to clarify the potential uses of the reclaimed lands. This paper explains a monitoring methodology implemented at the mining waste dump at the Puentes Mine in Spain. It consists of the selection of 11 plots on the basis of the time the spoils have been exposed to weathering, the type of reconstructed soils, the reclamation system applied, and the revegetation success. Furthermore, an attempt was made to include every possible situation in the dump. Over a period of 3 years, the evolution of the physicochemical conditions of the reconstructed soils, the soil organisms, the herbaceous species, mycorrhizae, tree species, and vertebrates in these plots were studied. The paper also defines the parameters that need to be controlled within each phase of the study. The results obtained reveal the necessity to place the spoils selectively in the dump, the possibilities offered by the ashes as amendments, and the importance of applying organic fertilizers, seeding herbaceous species as a first phase, selecting tree species, and introducing the vertebrates, soil organisms, and mycorrhizae gradually

  12. Optical two-beam traps in microfluidic systems

    DEFF Research Database (Denmark)

    Berg-Sørensen, Kirstine

    2016-01-01

    An attractive solution for optical trapping and stretching by means of two counterpropagating laser beams is to embed waveguides or optical fibers in a microfluidic system. The microfluidic system can be constructed in different materials, ranging from soft polymers that may easily be cast...... in a rapid prototyping manner, to hard polymers that could even be produced by injection moulding, or to silica in which waveguides may either be written directly, or with grooves for optical fibers. Here, we review different solutions to the system and also show results obtained in a polymer chip with DUV...... written waveguides and in an injection molded polymer chip with grooves for optical fibers. (C) 2016 The Japan Society of Applied Physics....

  13. Development of high current beam ns pulsed system

    CERN Document Server

    Shen Guan Ren; Gao Fu; Guan Xia Ling; LiuNaiYi

    2001-01-01

    The development of high current beam ns pulsed system of CPNG and its characteristic, main technological performance and application are introduced. Firstly, important parameters of the system are calculated using theoretical model, the design requirements of some important parts are understood. Some mistakes in physics conception are corrected. Second, the chopper is designed for parallel plate deflector, chopping aperture and sine wave voltage sweeping device. It is emphasized that the conception of parallel plate load impedance is the capacitance load, but not the 50 ohm load impedance. The dynamic capacitance value has been measured. The output emphasizes the output voltage amplitude, but not the output power for sweeping device. The display system of output sweeping voltage was set up and it is sure that the maximum output voltage(V-V) is >=4000 V. The klystron buncher are re-designed. It is emphasized to overcome difficulty of support high voltage electrode in the klystron and insulator of input sine wa...

  14. Dual axis translation apparatus and system for translating an optical beam and related method

    Science.gov (United States)

    Cassidy, Kelly

    1991-01-01

    A dual axis translation device and system in accordance with this invention, for translating an optical beam along both an x-axis and a y-axis which are perpendicular to one another, has a beam directing means acting on said optical beam for directing the beam along a particular path transverse to said x and y axes. An arrangement supporting said beam directing means for movement in the x and y direction within a given plane is provided. The arrangement includes a first means for translating said beam directing means along the x-axis in said given plane in order to translate the beam along said x-axis. The arrangement comprises a second means for translating said beam directing means along the y-axis in said given plane in order to translate the beam along said y-axis.

  15. Self-consistent study of space-charge-dominated beams in a misaligned transport system

    International Nuclear Information System (INIS)

    Sing Babu, P.; Goswami, A.; Pandit, V.S.

    2013-01-01

    A self-consistent particle-in-cell (PIC) simulation method is developed to investigate the dynamics of space-charge-dominated beams through a misaligned solenoid based transport system. Evolution of beam centroid, beam envelope and emittance is studied as a function of misalignment parameters for various types of beam distributions. Simulation results performed up to 40 mA of proton beam indicate that centroid oscillations induced by the displacement and rotational misalignments of solenoids do not depend of the beam distribution. It is shown that the beam envelope around the centroid is independent of the centroid motion for small centroid oscillation. In addition, we have estimated the loss of beam during the transport caused by the misalignment for various beam distributions

  16. Fast automatic system for measurements of beam parameters of the MMF linac

    International Nuclear Information System (INIS)

    Reinhardt-Nickulin, P.; Bragin, S.; Ilinsky, N.; Senichev, Yu.

    1992-01-01

    Fast transverse beam profile and current monitoring systems have been tested at the Linear Accelerator of Moscow Meson Factory. The signals for each system are derived from multiwire secondary emission chamber and beam current transformer. Each beam pulse is digitized by fast ADC's. There are two modes for systems. First one is for detailed beam adjustment and second one is for normal 100 Hz rate of the MMF Linac. Essential features of the hardware, software, data acquisition, measurement accuracy and beam results are presented. (author)

  17. Differential correction system of laser beam directional dithering based on symmetrical beamsplitter

    Science.gov (United States)

    Hongwei, Yang; Wei, Tao; Xiaoqia, Yin; Hui, Zhao

    2018-02-01

    This paper proposes a differential correction system with a differential optical path and a symmetrical beamsplitter for correcting the directional dithering of the laser beams. This system can split a collimated laser beam into two laser beams with equal and opposite movements. Thus, the positional averages of the two split laser beams remain constant irrespective of the dithering angle. The symmetrical beamsplitter designed based on transfer matrix principle is to balance the optical paths and irradiances of the two laser beams. Experimental results show that the directional dithering is reduced to less than one-pixel value. Finally, two examples show that this system can be widely used in one-dimensional measurement.

  18. System for producing high-resolution polarized and unpolarized beams with a tandem accelerator

    International Nuclear Information System (INIS)

    Westerfeldt, C.R.; Bilpuch, E.G.; Bleck, M.E.; Outlaw, D.A.; Wells, W.K.; Wilkerson, J.F.; Clegg, T.B.

    1983-01-01

    A tandem accelerator beam energy stabilizer, which utilizes an optically coupled fast feedback loop to the accelerator terminal stripper, is described. Emphasis is placed on the components of the feedback system and on the application of this system to production of high energy-resolution beams. This system produces beam energy spreads ranging from 450 to 600 eV FWHM for 2 to 16 MeV unpolarized protons. Polarized beam energy spreads range from 550 to 700 eV FWHM, for the same beam energy range

  19. New Acquisition System for the PSR Beam Pulse Charge Monitor

    International Nuclear Information System (INIS)

    Sellyey, William C.; Lewis, Paul S.

    2004-01-01

    A Pearson 1010 current monitor toroid has been in use for many years to measure the charge per bunch being delivered from the LANSCE Proton Storage Ring (PSR) to the Lujan Center's spallation neutron source. Improved electronics have been developed to process the toroid's signal. The new system generates a calibrated measurement of charge per pulse and is network-enabled to provide remote access to charge, current and other data via EPICS. It is experimentally demonstrated that accurate charge measurements can be made on calibration pulses that contain frequency components well above what is contained in a typical beam pulse. The new electronics consists of a National Instruments (NI) PXI-1002 chassis that contains a PXI-8176 controller, a PXI-5112 100-MS/s digitizer, and a PXI-6602 scalar and digital I/O module. The 8176 runs under the NI Real Time operating system and was programmed to integrate proton pulse waveforms acquired by the 5112 digitizer. For each beam pulse a 50-kHz pulse stream proportional to the pulse charge is generated by the 6602 and this real time information is distributed to all experimental areas

  20. Radioactive dumping in the Arctic Ocean

    International Nuclear Information System (INIS)

    Lamb, J.; Gizewski, P.

    1993-01-01

    Recent revelations concerning the possible environmental hazards posed by the sunken Soviet nuclear submarine Komsomolets and the disposal of radioactive materials in the Arctic and North Atlantic oceans have generated much controversy and debate. Too often, however, the key scientific and policy issues that the dumping raises are treated as two solitudes. In reality, decisions taken by national governments and international agencies in connection with remediation, regulation, and even research must be based on both science and policy. Indeed, a sound approach to the dumping issue must integrate scientific evidence and policy considerations relating to legal, political, social, and economic matters. Radioactive waste disposal is an exceedingly difficult problem. Information detailing the Soviet Navy's past dumping practices, and increasing awareness of the problems that Russia and other states may encounter in the future disposal of radioactive waste, indicate that the global inventory of radioactive wastes requiring storage and disposal is large and growing

  1. Construction of Superconducting Magnet System for the J-PARC Neutrino Beam Line

    Energy Technology Data Exchange (ETDEWEB)

    Nakamoto, T.; Wanderer, P.; Sasaki, K.; Ajima, Y.; Araoka, O.; Fujii, Y.; Hastings, N.; Higashi, N.; Iida, M.; Ishii, T.; Kimura, N.; Kobayashi, T.; Makida, Y.; Nakadaira, T.; Ogitsu, T.; Ohhata, H.; Okamura, T.; Sakashita, K.; Sugawara, S.; Suzuki, S.; Tanaka, K.; Tomaru, T.; Terashima, A.; Yamamoto, A.; Ichikawa, A.; Kakuno, H.; Anerella, M.; Escallier, J.; Ganetis, G.; gupta, R.; Jain, A.; Muratore, J.; Parker, B.; Boussuge, T.; Charrier, J.-P.; Arakawa, M.; Ichihara, T.; Minato, T.; Okada, Y.; Itou, A.; Kumaki, T.; Nagami, M.; Takahashi, T.

    2009-10-18

    Following success of a prototype R&D, construction of a superconducting magnet system for J-PARC neutrino beam line has been carried out since 2005. A new conceptual beam line with the superconducting combined function magnets demonstrated the successful beam transport to the neutrino production target.

  2. Status of the control and beam diagnostic systems of the CRYRING project

    International Nuclear Information System (INIS)

    Starker, J.; Engstroem, M.

    1992-01-01

    CRYRING is a facility for research in atomic, molecular and nuclear physics. It uses a cryogenic electron beam ion source, CRYSIS, together with an RFQ linear accelerator as injector into a synchrotron/storage ring for very highly charged, heavy ions. The first circulating beam was achieved in december 1990. The status of the systems for control and beam diagnostics are described. (author)

  3. Geotechnical aspects for the optimization of dump design at Chinh Bac Mine waste dump in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Fuchsschwanz, M.; Ziegler, M. [Aachen Univ., Aachen (Germany). Dept. of Geotechnical Engineering; Ahmad, S.; Fernandez, J.B.P.; Martens, P.N. [Aachen Univ., Aachen (Germany). Inst. of Mining Engineering; Deissmann, G. [Brenk Systemplanung GmbH, Aachen (Germany)

    2009-07-01

    Vietnam's Quang Ninh province is one of the country's most important coal producing regions. Several open pit mines are being operated in the area by Nui Beo Coal Company (NBCC). The construction of large waste dumps for overburden removed by blasting have led to environmental problems at the mining sites, including dust emissions from mining and dumping operations; ground and surface water contamination by acid mine drainage; and slope stability problems caused by heavy rainfall and dump movements. This paper discussed investigations regarding the influence of the dump layout on slope stability and erosion. The paper described the project site and ongoing activities for the development of optimized stabilization and rehabilitation concepts with a particular focus on geotechnical aspects. The site was described in terms of coal and waste rock production; Chinh Bac waste rock dump; crack mapping; material properties of dumped material; density; and settlements. Ongoing activities focus on the effect of benches on slope stability; influence of benches on erosion; and layered dumping. 7 refs., 4 figs.

  4. Analytical formula for a circular flattened Gaussian beam propagating through a misaligned paraxial ABCD optical system

    International Nuclear Information System (INIS)

    Hu Li; Cai Yangjian

    2006-01-01

    Based on the generalized diffraction integral formula for treating the propagation of a laser beam through a misaligned paraxial ABCD optical system in the cylindrical coordinate system, analytical formula for a circular flattened Gaussian beam propagating through such optical system is derived. Furthermore, an approximate analytical formula is derived for a circular flattened Gaussian beam propagating through an apertured misaligned ABCD optical system by expanding the hard aperture function as a finite sum of complex Gaussian functions. Numerical examples are given

  5. Propagation of a general-type beam through a truncated fractional Fourier transform optical system.

    Science.gov (United States)

    Zhao, Chengliang; Cai, Yangjian

    2010-03-01

    Paraxial propagation of a general-type beam through a truncated fractional Fourier transform (FRT) optical system is investigated. Analytical formulas for the electric field and effective beam width of a general-type beam in the FRT plane are derived based on the Collins formula. Our formulas can be used to study the propagation of a variety of laser beams--such as Gaussian, cos-Gaussian, cosh-Gaussian, sine-Gaussian, sinh-Gaussian, flat-topped, Hermite-cosh-Gaussian, Hermite-sine-Gaussian, higher-order annular Gaussian, Hermite-sinh-Gaussian and Hermite-cos-Gaussian beams--through a FRT optical system with or without truncation. The propagation properties of a Hermite-cos-Gaussian beam passing through a rectangularly truncated FRT optical system are studied as a numerical example. Our results clearly show that the truncated FRT optical system provides a convenient way for laser beam shaping.

  6. Source, transport and dumping of radioactive waste

    International Nuclear Information System (INIS)

    1980-03-01

    The results of an examination into the problems of radioactive waste are presented, in particular the sources, transport and dumping and the policy considerations in favour of specific methods. The theoretical background of radioactive waste is described, including the physical and chemical, ecological, medical and legal aspects. The practical aspects of radioactive waste in the Netherlands are considered, including the sources, the packaging and transport and dumping in the Atlantic Ocean. The politics and policies involved in this process are outlined. (C.F.)

  7. Optical Matching of Slowly Extracted Beam with Transport System at HIMAC

    CERN Document Server

    Furukawa, Takuji; Katsumata, Masashi; Noda, Koji; Shibuya, Shinji; Shiraishi, Tadahiro; Takada, Eiichi; Torikoshi, Masami; Uesugi, Takehiro; Yamada, Satoru

    2005-01-01

    The optical matching between the ring and the transport line plays important role in order to control the beam size and profile after the transport. At HIMAC, thus, we have studied the optical matching of the slowly extracted beam. As a result, it was verified that the beam size of the slowly extracted beam were controlled owing to the optical matching. It was also found that small deviation of quadrupole strength in the ring brings orbit distortion at the transport system.

  8. Beam-based alignment and tuning procedures for e+e- collider final focus systems

    International Nuclear Information System (INIS)

    Bulos, F.; Burke, D.; Helm, R.; Irwin, J.; Odian, A.; Roy, G.; Ruth, R.; Yamamoto

    1991-01-01

    For future linear colliders, with very small emittances and beam sizes and demanding tolerances on final focus system alignment and magnet errors, it becomes increasingly important to use the beam as a diagnostic tool. The authors report here procedures they have identified and will be implemented in the Final Focus Test Beam at SLAC incorporating (1) quadrupole strength changes, (2) central orbit modifications, (3) spot size measurements, and (4) beam stability monitoring

  9. Beam-based alignment and tuning procedures for e+e- collider final focus systems

    International Nuclear Information System (INIS)

    Bulos, F.; Burke, D.; Helm, R.; Irwin, J.; Odian, A.; Roy, G.; Ruth, R.; Yamamoto, N.

    1991-05-01

    For future linear colliders, with very small emittances and beam sizes and demanding tolerances on final focus system alignment and magnet errors, it becomes increasingly important to use the beam as a diagnostic tool. We report here procedures we have identified and will be implemented in the Final Focus Test Beam at SLAC incorporating (1) quadrupole strength changes, (2) central orbit modifications, (3) spot size measurements, and (4) beam stability monitoring. 3 refs., 4 figs., 3 tabs

  10. LogAmp electronics and Optical Transmission for the new SPS Beam Position Measurement System

    CERN Document Server

    Deplano, C; Gonzalez, J L; Savioz, J J

    2013-01-01

    A new front-end board is under development for the CERN SPS Multi ORbit Position System (MOPOS). Based on logarithmic amplifiers, it measures the beam position over a large dynamic range of beam intensities and resolves the multi-batch structure of the SPS beams. Analogue data are digitized at 10 MS/s, packed in frames by an FPGA and on every turn sent to the readout board, via a 2.4 Gb/s optical transmission link. A first prototype has been successfully tested with several SPS beams. This paper presents an overall description of the system and its capabilities highlighted by the first beam measurements.

  11. Radiation Safety System for SPIDER Neutral Beam Accelerator

    Science.gov (United States)

    Sandri, S.; Coniglio, A.; D'Arienzo, M.; Poggi, C.

    2011-12-01

    SPIDER (Source for Production of Ion of Deuterium Extracted from RF Plasma only) and MITICA (Megavolt ITER Injector Concept Advanced) are the ITER neutral beam injector (NBI) testing facilities of the PRIMA (Padova Research Injector Megavolt Accelerated) Center. Both injectors accelerate negative deuterium ions with a maximum energy of 1 MeV for MITICA and 100 keV for SPIDER with a maximum beam current of 40 A for both experiments. The SPIDER facility is classified in Italy as a particle accelerator. At present, the design of the radiation safety system for the facility has been completed and the relevant reports have been presented to the Italian regulatory authorities. Before SPIDER can operate, approval must be obtained from the Italian Regulatory Authority Board (IRAB) following a detailed licensing process. In the present work, the main project information and criteria for the SPIDER injector source are reported together with the analysis of hypothetical accidental situations and safety issues considerations. Neutron and photon nuclear analysis is presented, along with special shielding solutions designed to meet Italian regulatory dose limits. The contribution of activated corrosion products (ACP) to external exposure of workers has also been assessed. Nuclear analysis indicates that the photon contribution to worker external exposure is negligible, and the neutron dose can be considered by far the main radiation protection issue. Our results confirm that the injector has no important radiological impact on the population living around the facility.

  12. Intense relativistic electron beam injector system for tokamak current drive

    International Nuclear Information System (INIS)

    Bailey, V.L.; Creedon, J.M.; Ecker, B.M.; Helava, H.I.

    1983-01-01

    We report experimental and theoretical studies of an intense relativistic electron beam (REB) injection system designed for tokamak current drive experiments. The injection system uses a standard high-voltage pulsed REB generator and a magnetically insulated transmission line (MITL) to drive an REB-accelerating diode in plasma. A series of preliminary experiments has been carried out to test the system by injecting REBs into a test chamber with preformed plasma and applied magnetic field. REBs were accelerated from two types of diodes: a conventional vacuum diode with foil anode, and a plasma diode, i.e., an REB cathode immersed in the plasma. REB current was in the range of 50 to 100 kA and REB particle energy ranged from 0.1 to 1.0 MeV. MITL power density exceeded 10 GW/cm 2 . Performance of the injection system and REB transport properties is documented for plasma densities from 5 x 10 12 to 2 x 10 14 cm -3 . Injection system data are compared with numerical calculations of the performance of the coupled system consisting of the generator, MITL, and diode

  13. Beam Loss Monitoring for LHC Machine Protection

    Science.gov (United States)

    Holzer, Eva Barbara; Dehning, Bernd; Effnger, Ewald; Emery, Jonathan; Grishin, Viatcheslav; Hajdu, Csaba; Jackson, Stephen; Kurfuerst, Christoph; Marsili, Aurelien; Misiowiec, Marek; Nagel, Markus; Busto, Eduardo Nebot Del; Nordt, Annika; Roderick, Chris; Sapinski, Mariusz; Zamantzas, Christos

    The energy stored in the nominal LHC beams is two times 362 MJ, 100 times the energy of the Tevatron. As little as 1 mJ/cm3 deposited energy quenches a magnet at 7 TeV and 1 J/cm3 causes magnet damage. The beam dumps are the only places to safely dispose of this beam. One of the key systems for machine protection is the beam loss monitoring (BLM) system. About 3600 ionization chambers are installed at likely or critical loss locations around the LHC ring. The losses are integrated in 12 time intervals ranging from 40 μs to 84 s and compared to threshold values defined in 32 energy ranges. A beam abort is requested when potentially dangerous losses are detected or when any of the numerous internal system validation tests fails. In addition, loss data are used for machine set-up and operational verifications. The collimation system for example uses the loss data for set-up and regular performance verification. Commissioning and operational experience of the BLM are presented: The machine protection functionality of the BLM system has been fully reliable; the LHC availability has not been compromised by false beam aborts.

  14. The 12 kV, 50 kA Pulse Generator for the SPS MKDH Horizontal Beam Dump Kicker System,equipped with Semiconductor Switches

    CERN Document Server

    Bonthond, J; Faure, P; Vossenberg, Eugène B; CERN. Geneva. SPS and LHC Division

    2001-01-01

    The high current pulses for the MKDH magnets are generated with capacitor discharge type generators which, combined with a resistive free-wheel diode circuit, deliver a critically damped half-sine current with a rise-time of 25 ms. Each generator consists of two 25 kA units, connected in parallel to a magnet via low inductance transmission lines. They are equipped with a stack of four Fast High Current Thyristors, together with snubber capacitors, a voltage divider and a specially designed trigger transformer.

  15. Combatting social dumping - also an obligation for municipalities

    DEFF Research Database (Denmark)

    Jørgensen, Henning; Baadsgaard, Kelvin

    2018-01-01

    Analytisk indkredsning af social dumping og argumentation for kommuners opgaver i forbindelse med bekæmpelse heraf......Analytisk indkredsning af social dumping og argumentation for kommuners opgaver i forbindelse med bekæmpelse heraf...

  16. Systems analysis for modular versus multi-beam HIF drivers

    International Nuclear Information System (INIS)

    Meier, W.R.; Logan, B.G.

    2004-01-01

    Previous modeling for HIF drivers concentrated on designs in which 100 or more beams are grouped in an array and accelerated through a common set of induction cores. The total beam energy required by the target is achieved by the combination of final ion energy, current per beam and number of beams. Economic scaling favors a large number of small (∼1 cm dia.) beams. An alternative architecture has now been investigated, which we refer to as a modular driver. In this case, the driver is subdivided into many (>10) independent accelerators with one or many beams each. A key objective of the modular driver approach is to be able to demonstrate all aspects of the driver (source-to-target) by building a single, lower cost module compared to a full-scale, multi-beam driver. We consider and compare several design options for the modular driver including single-beam designs with solenoid instead of quadrupole magnets in order to transport the required current per module in a single beam, solenoid/quad combinations, and multi-beam, all-quad designs. The drivers are designed to meet the requirements of the hybrid target, which can accommodate a larger spot size than the distributed radiator target that was used for the Robust Point Design. We compare the multi-beam and modular driver configuration for a variety and assumptions and identify key technology advances needed for the modular design

  17. Systems and methods of varying charged particle beam spot size

    Science.gov (United States)

    Chen, Yu-Jiuan

    2014-09-02

    Methods and devices enable shaping of a charged particle beam. A modified dielectric wall accelerator includes a high gradient lens section and a main section. The high gradient lens section can be dynamically adjusted to establish the desired electric fields to minimize undesirable transverse defocusing fields at the entrance to the dielectric wall accelerator. Once a baseline setting with desirable output beam characteristic is established, the output beam can be dynamically modified to vary the output beam characteristics. The output beam can be modified by slightly adjusting the electric fields established across different sections of the modified dielectric wall accelerator. Additional control over the shape of the output beam can be excreted by introducing intentional timing de-synchronization offsets and producing an injected beam that is not fully matched to the entrance of the modified dielectric accelerator.

  18. Uniform irradiation system using beam scanning method for cyclotron

    International Nuclear Information System (INIS)

    Agematsu, Takashi; Okumura, Susumu; Arakawa, Kazuo

    1994-03-01

    JAERI AVF-cyclotron is equipped with an ion beam scanner for large area irradiation. The two-dimensional fluence distribution of ion beam obtained using cellulose triacetate film dosimeter was not uniform. This is resulted from the distortion of excitation current for electromagnet of the scanner. So, the beam scanning condition, i.e., the relation between the ion species, the beam profile and the scanning width, was extremely limited to make a good uniformity. We have developed a beam scanning simulator to get fluence distributions by calculation and then compared the simulated distributions with the measured ones. It was revealed that the both of them are in good agreement and the beam scanning condition to get good uniformity was led by using this simulator. On the basis of these results, the power supply of scanner was improved. A good uniformity of beam distribution was available. (author)

  19. 2D potential measurements by applying automatic beam adjustment system to heavy ion beam probe diagnostic on the Large Helical Device

    International Nuclear Information System (INIS)

    Shimizu, A.; Ido, T.; Kato, S.; Hamada, Y.; Kurachi, M.; Makino, R.; Nishiura, M.; Nishizawa, A.

    2014-01-01

    Two-dimensional potential profiles in the Large Helical Device (LHD) were measured with heavy ion beam probe (HIBP). To measure the two-dimensional profile, the probe beam energy has to be changed. However, this task is not easy, because the beam transport line of LHD-HIBP system is very long (∼20 m), and the required beam adjustment consumes much time. To reduce the probe beam energy adjustment time, an automatic beam adjustment system has been developed. Using this system, required time to change the probe beam energy is dramatically reduced, such that two-dimensional potential profiles were able to be successfully measured with HIBP by changing the probe beam energy shot to shot

  20. Analysis of the London dumping convention

    International Nuclear Information System (INIS)

    Nauke, M.K.

    1983-05-01

    This report gives an in-depth review of the provisions of the London Dumping Convention and of its origins in the context of the international legal framework for controlling all aspects of marine pollution. Particular attention is paid to the provisions concerning radioactive waste. (NEA) [fr

  1. EU Economic Freedoms and Social Dumping

    NARCIS (Netherlands)

    Cremers, Jan; Bernaciak, Magdalena

    2015-01-01

    In the book, 'Market Expansion and Social Dumping in Europe', edited by Magdalena Bernaciak and published by Routledge, Jan Cremers (AIAS and Tilburg University) contributes with a chapter called ‘EU economic freedoms and social dumping’. He demonstrates how the emphasis on the primacy of economic

  2. EU economic freedoms and social dumping

    NARCIS (Netherlands)

    Cremers, J.; Bernaciak, M.

    2015-01-01

    In the book, Market Expansion and Social Dumping in Europe, edited by Magdalena Bernaciak and published by Routledge, Jan Cremers (AIAS) contributes with a chapter called ‘EU economic freedoms and social dumping’. He demonstrates how the emphasis on the primacy of economic freedoms has negatively

  3. Decision of the Council establishing a multilateral consultation and surveillance mechanism for sea dumping of radioactive waste

    International Nuclear Information System (INIS)

    1977-01-01

    This Mechanism set up by the OECD Council on 22nd July, 1977 supplements the system established by the 1975 London Convention on prevention of marine pollution by dumping of wastes and the IAEA provisional definition and recommendations. It lays down further compulsory rules on sea dumping of radioactive waste and provides for a prior notification and consultation procedure (choice of dumping site, containers, ships etc), international surveillance and an information system consisting of regular updating of standards guidelines and recommendations to be applied in the field. (NEA) [fr

  4. Multi-slit triode ion optical system with ballistic beam focusing

    Energy Technology Data Exchange (ETDEWEB)

    Davydenko, V., E-mail: V.I.Davydenko@inp.nsk.su; Amirov, V.; Gorbovsky, A.; Deichuli, P.; Ivanov, A.; Kolmogorov, A.; Kapitonov, V.; Mishagin, V.; Shikhovtsev, I.; Sorokin, A.; Stupishin, N. [Budker Institute of Nuclear Physics, Novosibirsk 630090 (Russian Federation); Karpushov, A. N. [Ecole Polytechnique Fédérale de Lausanne, Centre de Recherches en Physique des Plasmas (CRPP), CH-1015 Lausanne (Switzerland); Smirnov, A. [Tri Alpha Energy, Inc., Rancho Santa Margarita, California 92688 (United States); Uhlemann, R. [Institute of Energy and Climate Research-Plasma Physics, Research Center Juelich, 52425 Juelich (Germany)

    2016-02-15

    Multi-slit triode ion-optical systems with spherical electrodes are of interest for formation of intense focused neutral beams for plasma heating. At present, two versions of focusing multi-slit triode ion optical system are developed. The first ion optical system forms the proton beam with 15 keV energy, 140 A current, and 30 ms duration. The second ion optical system is intended for heating neutral beam injector of Tokamak Configuration Variable (TCV). The injector produces focused deuterium neutral beam with 35 keV energy, 1 MW power, and 2 s duration. In the later case, the angular beam divergence of the neutral beam is 20-22 mrad in the direction across the slits of the ion optical system and 12 mrad in the direction along the slits.

  5. Performance of the HIMAC beam control system using multiple-energy synchrotron operation

    Science.gov (United States)

    Mizushima, K.; Furukawa, T.; Iwata, Y.; Hara, Y.; Saotome, N.; Saraya, Y.; Tansho, R.; Sato, S.; Fujimoto, T.; Shirai, T.; Noda, K.

    2017-09-01

    Multiple-energy synchrotron operation was developed to realize fast 3D scanning irradiation for carbon-ion radiotherapy. This type of operation can output various carbon-ion beams with different energies in a single synchrotron cycle. The beam control system used in this kind of operation was developed to quickly provide the beam energy and intensity required from the irradiation control system. The performance of the system was verified by experimental tests. The system could output beams of 197 different energies in 63 s. The beam intensity could be controlled for all the output beams without large ripples or overshooting. The experimental test of irradiation for prostate cancer treatment was also successfully performed, and the test results proved that our system can greatly reduce the irradiation time.

  6. 7 CFR 46.22 - Accounting for dumped produce.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Accounting for dumped produce. 46.22 Section 46.22... Market Receivers § 46.22 Accounting for dumped produce. A clear and complete record shall be maintained... justifying dumping shall be forwarded to the consignor or joint account partner with the accounting and a...

  7. La condicionalidad social como remedio al dumping = Social clause as remedy to dumping

    OpenAIRE

    D??az Pascual, Fernando

    2015-01-01

    El estudio trata de abordar las diferentes formas con las que luchar contra el dumping social. A tal fin, se analiza, en primer lugar el concepto e implicaciones del dumping social. Acto seguido, se abordan las distintas alternativas empleadas para combatirlo, empezando por la condicionalidad social en general, atendiendo a su primer origen normativo, explicando en qu?? consiste y sus posturas tanto a favor como en contra. El segundo modo para hacerle frente, o condicionalidad unilateral, vie...

  8. Ghost reflections of Gaussian beams in anamorphic optical systems with an application to Michelson interferometer.

    Science.gov (United States)

    Abd El-Maksoud, Rania H

    2016-02-20

    In this paper, a methodology is developed to model and analyze the effect of undesired (ghost) reflections of Gaussian beams that are produced by anamorphic optical systems. The superposition of these beams with the nominal beam modulates the nominal power distribution at the recording plane. This modulation may cause contrast reduction, veiling parts of the nominal image, and/or the formation of spurious interference fringes. The developed methodology is based on synthesizing the beam optical paths into nominal and ghost optical beam paths. Similar to the nominal beam, we present the concept that each ghost beam is characterized by a beam size, wavefront radius of curvature, and Gouy phase in the paraxial regime. The nominal and ghost beams are sequentially traced through the system and formulas for estimating the electric field magnitude and phase of each ghost beam at the recording plane are presented. The effective electric field is the addition of the individual nominal and ghost electric fields. Formulas for estimating Gouy phase, the shape of the interference fringes, and the central interference order are introduced. As an application, the theory of the formation of the interference fringes by Michelson interferometer is presented. This theory takes into consideration the ghost reflections that are formed by the beam splitter. To illustrate the theory and to show its wide applicability, simulation examples that include a Mangin mirror, a Michelson interferometer, and a black box optical system are provided.

  9. Low-energy run of Fermilab Electron Cooler's beam generation system

    Energy Technology Data Exchange (ETDEWEB)

    Prost, Lionel; Shemyakin, Alexander; /Fermilab; Fedotov, Alexei; Kewisch, Jorg; /Brookhaven

    2010-08-01

    As a part of a feasibility study of using the Fermilab Electron Cooler for a low-energy Relativistic Heavy Ion Collider (RHIC) run at Brookhaven National Laboratory (BNL), the cooler operation at 1.6 MeV electron beam energy was tested in a short beam line configuration. The main result of the study is that the cooler beam generation system is suitable for BNL needs. In a striking difference with running 4.3 MeV beam, no unprovoked beam recirculation interruptions were observed.

  10. Ion beam probe diagnostic system for the LITE experiment

    International Nuclear Information System (INIS)

    Stufflebeam, J.H.; Jennings, W.C.; Hickok, R.L.

    1974-11-01

    The problem of defocusing of the ion beam by the strong gradients in the magnetic field was discussed. It was shown this can be overcome by a linear field lens to shape the initial beam, or by proper selection of the size and position of the secondary ion detector. The results of the preliminary beam alignment were presented and the favorable comparison of the scaling formula and computer simulation was evident

  11. Development of high intensity beam handling system, 4

    International Nuclear Information System (INIS)

    Yamanoi, Yutaka; Tanaka, Kazuhiro; Minakawa, Michifumi

    1992-01-01

    We have constructed the new counter experimental hall at the KEK 12 GeV Proton Synchrotron (KEK-PS) in order to handle high intensity primary proton beams of up to 1x10 3 pps (protons per second), which is one order of magnitude greater than the present beam intensity of the KEK-PS, 1x10 12 pps. New technologies for handling high-intensity beams have, then, been developed and employed in the construction of the new hall. A part of our R/D work on handling high intensity beams will be reported. (author)

  12. New magnet transport system for the LHC beam transfer lines

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system (pictured here in one of the tunnels) is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The lead vehicle is powered by an electric rail set into the roof of the tunnel. The system is backed up by electrical batteries that enable it to operate in the absence of an outside power source or in the event of power failure. Last but not least, for the long-distance transport of magnets, it can be optically guided by a line traced on the tunnel floor. The convoy moves through the particularly narr...

  13. The beam monitor system for heavy ion shallow in tumor therapy

    International Nuclear Information System (INIS)

    Tang Bin; Hu Zhengguo; Xu Zhiguo; Mao Ruishi; Zhang Xueheng; Tu Xiaolin; Guo Zhongyan; Sun Zhiyu; Wang Meng; Xiao Guoqing; Xu Hushan

    2008-01-01

    The program of heavy ion shallow tumor therapy has been started. The beam monitor system for the therapy is described in this paper. It is composed of plastic scintillator, which used to monitor the stability of beam intensity and control the irradiation dose, and PPAC which is to measure the beam homogeneity in the irradiation area. This system has shown good performance in the clinic experiments of the shallow tumor therapy. (authors)

  14. Feasibility of Harvesting Radon from FRIB Beam Dump

    Energy Technology Data Exchange (ETDEWEB)

    Visser, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Scielzo, N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-11-15

    The observation of a permanent electric dipole moment (EDM) in an atom would signal a long-soughtafter presence of time-reversal violation and would have far reaching consequences for both particle physics and cosmology. Currently, the most stringent limitation on time-reversal violating effects in the nucleus comes from studies of stable 199Hg. However, for certain nuclei which have an octupole deformed shape, such as 223Rn, the time-reversal violating interactions are expected to be 100-1000 times greater than in 199Hg (Auerbach et al. 1996). As a result, there is great interest in searching for EDMs in octupole deformed nuclei and some of the initial studies of these nuclei have been featured on the cover of the journal Nature (Gaffney et al. 2013). All the octupole deformed nuclei of interest are radioactive and therefore available only in limited quantities. The primary challenge for an EDM experiment using radon is to collect large enough samples to perform sensitive searches.

  15. The role of dumping syndrome in weight loss after gastric bypass surgery.

    Science.gov (United States)

    Banerjee, Ambar; Ding, Yi; Mikami, Dean J; Needleman, Bradley J

    2013-05-01

    Roux-en-Y gastric bypass is the most commonly performed operation for the treatment of morbid obesity in the US. Dumping syndrome is an expected and desired part of the behavior modification caused by gastric bypass surgery; it can deter patients from consuming energy-dense food. In this study we assessed the role dumping has in weight loss and its relationship with the patient's eating behavior. Fifty patients who underwent gastric bypass between January 2008 and June 2008 were enrolled. Two questionnaires, the dumping syndrome questionnaire and the Three-Factor Eating Questionnaire (TFEQ), were used to record the patients' responses. The diagnosis of dumping syndrome was based on the Sigstad scoring system, where a score of 7 and above was considered positive. TFEQ evaluated the patients' eating behavior under three scales: cognitive restraint, uncontrolled eating, and emotional eating. The results were analyzed with descriptive and parametric statistics where applicable. The prevalence of dumping syndrome was 42 %, with 66.7 % of the subjects being women. The nondumpers were observed to have a greater mean decrease in body mass index than the dumpers at 1 and 2 years (18.5 and 17.8 vs. 14.4 and 13.7 respectively). There was no definite relationship between the presence of dumping syndrome and the eating behavior of the patient. However, the cognitive restraint scores, greater than 80 %, were associated with an average decrease in BMI of 19 and 20.8 at 1 and 2 years compared with 14.6 and 12.4 in those with scores less than 80 % (p = 0.01 and p = 0.03, respectively). The presence of dumping syndrome after gastric bypass does not influence weight loss, though eating behaviors may directly influence it.

  16. Tokamak Fusion Test Reactor neutral beam injection system vacuum chamber

    International Nuclear Information System (INIS)

    Pedrotti, L.R.

    1977-01-01

    Most of the components of the Neutral Beam Lines of the Tokamak Fusion Test Reactor (TFTR) will be enclosed in a 50 cubic meter box-shaped vacuum chamber. The chamber will have a number of unorthodox features to accomodate both neutral beam and TFTR requirements. The design constraints, and the resulting chamber design, are presented

  17. Prototype system for phase advance measurements of LHC small beam oscillations

    CERN Document Server

    Olexa, J; Brezovic, Z; Gasior, M

    2013-01-01

    Magnet lattice parameters of the Large Hadron Collider (LHC) are measured by exciting beam transverse oscillations that allow measuring their phase advance using the beam position measurement (BPM) system. However, the BPM system requires millimetre oscillation amplitudes, with which nominal high intensity beams would cause large particle loss, dangerous for the LHC superconducting magnets. Therefore, such measurements cannot be done often, as they require special low intensity beams with important set-up time. After its first long shut-down the LHC will be equipped with new collimators with embedded BPMs, for which a new front-end electronics has been developed. Its main processing channels based on compensated diode detectors are designed for beam orbit measurement with sub-micrometre resolution. It is planned to extend this system by adding dedicated channels optimised for phase advance measurement, allowing continuous LHC optics measurement with much smaller beam excitation. This subsystem will be based o...

  18. A Collision Detection-Based Wandering Method for Equipment Deploy Scene in Land Reclamation Area of Mining Dump

    OpenAIRE

    Ma, Juncheng; Li, Daoliang; Chen, Yingyi; Li, Li; Gao, Fei; Zhang, Lingxian

    2011-01-01

    Part 1: Decision Support Systems, Intelligent Systems and Artificial Intelligence Applications; International audience; Aiming at developing a simple and efficient collision detection method to support the wandering in equipment deploy scene in land reclamation area of mining dump. This paper presents an efficient algorithm for collision detection in the waste dump land reclamation equipment deploy scene using a bounding volume nestification which consists of an oriented bounding boxes (OBBs)...

  19. Modelling and Testing of the Piezoelectric Beam as Energy Harvesting System

    Directory of Open Access Journals (Sweden)

    Koszewnik Andrzej

    2016-12-01

    Full Text Available The paper describes modelling and testing of the piezoelectric beam as energy harvesting system. The cantilever beam with two piezo-elements glued onto its surface is considered in the paper. As result of carried out modal analysis of the beam the natural frequencies and modes shapes are determined. The obtained results in the way mentioned above allow to estimate such location of the piezo-actuator on the beam where the piezo generates maximal values of modal control forces. Experimental investigations carried out in the laboratory allow to verify results of natural frequencies obtained during simulation and also testing of the beam in order to obtain voltage from vibration with help of the piezo-harvester. The obtained values of voltage stored on the capacitor C0 shown that the best results are achieved for the beam excited to vibration with third natural frequency, but the worst results for the beam oscillating with the first natural frequency.

  20. Computer controlled vacuum control system for synchrotron radiation beam lines

    International Nuclear Information System (INIS)

    Goldberg, S.M.; Wang, C.; Yang, J.

    1983-01-01

    The increasing number and complexity of vacuum control systems at the Stanford Synchrotron Radiation Laboratory has resulted in the need to computerize its operations in order to lower costs and increase efficiency of operation. Status signals are transmitted through digital and analog serial data links which use microprocessors to monitor vacuum status continuously. Each microprocessor has a unique address and up to 256 can be connected to the host computer over a single RS232 data line. A FORTRAN program on the host computer will request status messages and send control messages via only one RS232 line per beam line, signal the operator when a fault condition occurs, take automatic corrective actions, warn of impending valve failure, and keep a running log of all changes in vacuum status for later recall. Wiring costs are thus greatly reduced and more status conditions can be monitored without adding excessively to the complexity of the system. Operators can then obtain status reports at various locations in the lab quickly without having to read a large number of meter and LED's

  1. Beam Test of the ATLAS Level-1 Calorimeter Trigger System

    CERN Document Server

    Garvey, J; Mahout, G; Moye, T H; Staley, R J; Thomas, J P; Typaldos, D; Watkins, P M; Watson, A; Achenbach, R; Föhlisch, F; Geweniger, C; Hanke, P; Kluge, E E; Mahboubi, K; Meier, K; Meshkov, P; Rühr, F; Schmitt, K; Schultz-Coulon, H C; Ay, C; Bauss, B; Belkin, A; Rieke, S; Schäfer, U; Tapprogge, T; Trefzger, T; Weber, GA; Eisenhandler, E F; Landon, M; Apostologlou, P; Barnett, B M; Brawn, I P; Davis, A O; Edwards, J; Gee, C N P; Gillman, A R; Mirea, A; Perera, V J O; Qian, W; Sankey, D P C; Bohm, C; Hellman, S; Hidvegi, A; Silverstein, S

    2005-01-01

    The Level-1 Calorimter Trigger consists of a Preprocessor (PP), a Cluster Processor (CP), and a Jet/Energy-sum Processor (JEP). The CP and JEP receive digitised trigger-tower data from the Preprocessor and produce Region-of-Interest (RoIs) and trigger multiplicities. The latter are sent in real time to the Central Trigger Processor (CTP) where the Level-1 decision is made. On receipt of a Level-1 Accept, Readout Driver Modules (RODs), provide intermediate results to the data acquisition (DAQ) system for monitoring and diagnostic purpose. RoI information is sent to the RoI builder (RoIB) to help reduce the amount of data required for the Level-2 Trigger The Level-1 Calorimeter Trigger System at the test beam consisted of 1 Preprocessor module, 1 Cluster Processor Module, 1 Jet/Energy Module and 2 Common Merger Modules. Calorimeter energies were sucessfully handled thourghout the chain and trigger object sent to the CTP. Level-1 Accepts were sucessfully produced and used to drive the readout path. Online diagno...

  2. Conceptual design of beam dividing system for J-PARC Transmutation Experimental Facility

    International Nuclear Information System (INIS)

    Yoshimoto, Masahiro; Okabe, Kota; Kinsho, Michikazu

    2015-01-01

    At the Japan Proton Accelerator Research Complex, a new experimental facility called the Transmutation Experimental Facility (TEF) is planned for the Accelerator-Driven System. The TEF facility will use the 400 MeV proton beam from the LINAC, which requires introducing a beam dividing system at a Beam Transport from the LINAC to the 3 GeV Rapid Cycling Synchrotron (RCS). However, an early feasibility study indicates that sufficient beam orbit separation is difficult to obtain at the doublet with only a pulsed bending magnet. Therefore, the beam for the TEF is extracted by using both the pulsed bending magnet and a static septum magnet. To optimize this two-step beam extraction scheme, the doublet quadrupole magnets should be improved. Moreover, the residual field of the pulse bending magnet at zero current should be corrected. By studying every possible scheme for the beam dividing system under current conditions, we expect to obtain a realistic design for the beam dividing system. In this paper, we introduce a conceptual design of the beam dividing system that is based on resent results of studies of realistic designs. (author)

  3. Developing an expert system to control a beam line at the Los Alamos Meson Physics Facility

    International Nuclear Information System (INIS)

    Clearwater, S.H.; Papcun, G.; Clark, D.A.

    1985-01-01

    High energy particle experiments require an accelerator as a source of high energy particles. To increase the productivity of an accelerator facility, we wish to develop an expert system to control beam lines. Expert Systems are a branch of Artificial Intelligence where a computer program performs tasks requiring human expertise. Unlike most expert systems we have a physical model underlying our beam line and this model can be used with the expert system to improve performance. The development of the expert system will lead to an increased understanding of the beam line as well as the possibility of state-of-the-art expert system building

  4. The design of the electronic system on neutron beam monitor based on GEM

    International Nuclear Information System (INIS)

    Zuo Min; Zhuang Bao'an; Zhao Yubin; Chen Shaojia; Wang Na; Zhang Hongyu; Zhao Jingwei

    2012-01-01

    The Neutron Beam Monitor - a GEM based system used to monitor the neutron beams in real time - is introduced. The electronic parts are described in details, including the principles of the circuit, the system structure, the design of the Daughterboard and the logic and algorithm of the FPGA on the Monitor board. The test results are also given out in the final. (authors)

  5. Modelling and calibration of the laser beam-scanning triangulation measurement system

    NARCIS (Netherlands)

    Wang, G.Y.; Zheng, Bing; Li, Xin; Houkes, Z.; Regtien, Paulus P.L.

    2002-01-01

    We present an approach of modelling and calibration of an active laser beam-scanning triangulation measurement system. The system works with the pattern of two-dimensional beam-scanning illumination and one-dimensional slit-scanning detection with a photo-multiplier tube instead of a CCD camera. By

  6. A proton beam delivery system for conformal therapy and intensity modulated therapy

    International Nuclear Information System (INIS)

    Yu Qingchang

    2001-01-01

    A scattering proton beam delivery system for conformal therapy and intensity modulated therapy is described. The beam is laterally spread out by a dual-ring double scattering system and collimated by a program-controlled multileaf collimator and patient specific fixed collimators. The proton range is adjusted and modulated by a program controlled binary filter and ridge filters

  7. SLC beam line error analysis using a model-based expert system

    International Nuclear Information System (INIS)

    Lee, M.; Kleban, S.

    1988-02-01

    Commissioning particle beam line is usually a very time-consuming and labor-intensive task for accelerator physicists. To aid in commissioning, we developed a model-based expert system that identifies error-free regions, as well as localizing beam line errors. This paper will give examples of the use of our system for the SLC commissioning. 8 refs., 5 figs

  8. Simulations of beam trajectory for position target optimization of extraction system output beams cyclotron proton Decy-13

    International Nuclear Information System (INIS)

    Idrus Abdul Kudus; Taufik

    2015-01-01

    Positioning and track simulation beam the cyclotron Decy-13 for laying optimization the target system have been done using lorentz force function and scilab 5.4.1 simulation. Magnetic field and electric field is calculated using Opera3D/Tosca as a simulation input. Used radio frequency is 77.66 MHz with the amplitude voltage is 40 kV is obtained energy 13 MeV. The result showed that the coordinates of the laying of the target system in a vacuum chamber is located at x = -389 mm and y = 445 mm with the width of the output beam is 10 mm. The laying stripper position for the output in center target is located at x = -76 mm and y =416 mm from the center coordinate on the center of dee with the energy of proton is 13 MeV at the point of beam extraction carbon foil. The changes position laying is carried out on range x = -70; y = 424 mm until x = - 118; y = 374 mm result for shifting area stripper which is still capable of deflection the electron beam. (author)

  9. Performance of a fast acquisition system for in-beam PET monitoring tested with clinical proton beams

    Energy Technology Data Exchange (ETDEWEB)

    Piliero, M.A., E-mail: piliero@pi.infn.it [Department of Physics, University of Pisa and INFN, sezione di Pisa (Italy); Bisogni, M.G. [Department of Physics, University of Pisa and INFN, sezione di Pisa (Italy); Cerello, P. [INFN, sezione di Torino (Italy); Department of Physics, University of Torino (Italy); Del Guerra, A. [Department of Physics, University of Pisa and INFN, sezione di Pisa (Italy); Fiorina, E. [INFN, sezione di Torino (Italy); Department of Physics, University of Torino (Italy); Liu, B.; Morrocchi, M. [Department of Physics, University of Pisa and INFN, sezione di Pisa (Italy); Pennazio, F. [INFN, sezione di Torino (Italy); Department of Physics, University of Torino (Italy); Pirrone, G. [Department of Physics, University of Pisa and INFN, sezione di Pisa (Italy); Wheadon, R. [INFN, sezione di Torino (Italy)

    2015-12-21

    In this work we present the performance of a fast acquisition system for in-beam PET monitoring during the irradiation of a PMMA phantom with a clinical proton beam. The experimental set-up was based on 4 independent detection modules. Two detection modules were placed at one side of a PMMA phantom and the other two modules were placed at the opposite side of the phantom. One detection module was composed of a Silicon Photon Multiplier produced by AdvanSiD coupled to a single scintillating LYSO crystal. The read-out system was based on the TOFPET ASIC managed by a Xilinx ML605 FPGA Evaluation Board (Virtex 6). The irradiation of the PMMA phantom was performed at the CNAO hadrontherapy facility (Pavia, Italy) with a 95 MeV pulsed proton beam. The pulsed time structure of the proton beam was reconstructed by each detection module. The β{sup +} annihilation peak was successfully measured and the production of β{sup +} isotopes emitters was observed as increasing number of 511 keV events detected during irradiation. Finally, after the irradiation, the half lives of the {sup 11}C and {sup 15}O radioactive isotopes were estimated.

  10. Patient dumping. Status, implications, and policy recommendations.

    Science.gov (United States)

    Ansell, D A; Schiff, R L

    1987-03-20

    Patient dumping, or the transfer of patients from private to public hospitals because of economic or social factors, is on the increase throughout the United States. Focusing on the dumping of patients by hospital emergency departments, the authors examine the economic, ethical, legal, and medical aspects of the problem. Although 22 states and the federal government have enacted statutes requiring hospitals to provide emergency care regardless of ability to pay and requiring that patients be stabilized before transfer to another hospital, Ansell and Schiff contend that even the best of these laws are deficient in defining such terms as "emergency" and "patient stability" and that monitoring and enforcement of existing laws and the guidelines of the American College of Emergency Physicians are inadequate. They propose a policy that no patient in need of emergency hospitalization should be denied admission or transferred for economic reasons.

  11. Advanced rapid prototyping by laser beam sintering of metal prototypes: design and development of an optimized laser beam delivery system

    Science.gov (United States)

    Geiger, Manfred; Coremans, A.; Neubauer, Norbert; Niebling, F.

    1996-08-01

    Fast technological advances and steadily increasing severe worldwide competition force industry to respond all the time faster to new and chanced customer wishes. Some of the recently emerged processes, commonly referred to as 'rapid prototyping' (RP), have proved to be powerful tools for accelerating product and process development. Early approaches aimed at the automated production of plastic models. These techniques achieved industrial maturity extremely fast and are meanwhile established as standard utilities in the field of development/design processes. So far, their applicability to metal working industry was limited to design studies because the mechanical properties of the prototypes, e.g. modulus of elasticity and mechanical strength were not comparable to the final products they represented. Therefore, RP-processes aimed at the direct production of metallic prototypes gained more and more importance during recent years. A technique belonging to this group is manufacturing of prototypes by using a laser beam sintering machine capable of directly processing metal powders. This so called laser beam sintering process showed a great potential for direct manufacturing of functional tools and prototypes in early feasibility studies. Detailed examinations were performed at several research centers to determine the attainable quality of the parts concerning roughness, dimensional accuracy and mechanical strength. These examinations showed, that there still is a considerable demand for quality improvements of the previously mentioned parameters. The practical application and the potential for improvement of the geometrical accuracy of laser beam sintered parts by using a dual beam concept was proven. An innovative beam guiding and forming concept, similar to the previously mentioned patented beam guiding system, was developed and built with the goal to improve the process parameters governing mechanical properties as well as geometrical accuracy. Further reaching

  12. A very sensitive nonintercepting beam average velocity monitoring system for the TRIUMF 300-keV injection line

    International Nuclear Information System (INIS)

    Yin, Y.; Laxdal, R.E.; Zelenski, A.; Ostroumov, P.

    1997-01-01

    A nonintercepting beam velocity monitoring system has been installed in the 300-keV injection line of the TRIUMF cyclotron to reproduce the injection energy for beam from different ion sources and to monitor any beam energy fluctuations. By using a programmable beam signal leveling method the system can work with a beam current dynamic range of 50 dB. Using synchronous detection, the system can detect 0.5 eV peak-to-peak energy modulation of the beam, sensitivity is 1.7x10 -6 . The paper will describe the principle and beam measurement results. copyright 1997 American Institute of Physics

  13. The application of multilayer elastic beam in MEMS safe and arming system

    Energy Technology Data Exchange (ETDEWEB)

    Li, Guozhong, E-mail: liguozhong-bit@bit.edu.cn; Shi, Gengchen; Sui, Li [National Lab of Mechatronic Engineering and Control, Beijing Institute of Technology, Beijing 100081, P.R.CHINA (China); Yi, Futing; Wang, Bo [Institute of High Energy Physics Chinese Academy of Sciences, Beijing 100049, P.R.CHINA (China)

    2015-07-15

    In this paper, a new approach for a multilayer elastic beam to provide a driving force and driving distance for a MEMS safe and arming system is presented. In particular this is applied where a monolayer elastic beam cannot provide adequate driving force and driving distance at the same time in limited space. Compared with thicker elastic beams, the bilayer elastic beam can provide twice the driving force of a monolayer beam to guarantee the MEMS safe and arming systems work reliably without decreasing the driving distance. In this paper, the theoretical analysis, numerical simulation and experimental verification of the multilayer elastic beam is presented. The numerical simulation and experimental results show that the bilayer elastic provides 1.8–2 times the driving force of a monolayer, and a method that improves driving force without reducing the driving distance.

  14. Conceptual design of Dump resistor for Superconducting CS of SST-1

    Science.gov (United States)

    Roy, Swati; Raj, Piyush; Panchal, Arun; Pradhan, Subrata

    2017-04-01

    Under upgradation activities for SST-1, the existing resistive central solenoid (CS) coil will be replaced with Nb3Sn based superconducting coil. Design of Central solenoid had been completed and some of the initiative has already taken for its manufacturing. The superconducting CS will store upto 3 MJ of magnetic energy per operation cycle with operating current upto 14 kA. During quench, energy stored in the coils has to be extracted rapidly with a time constant of 1.5 s by inserting a 20 mΩ dump resistor in series with the superconducting CS which is normally shorted by circuit breakers. As a critical part of the superconducting CS quench protection system, a conceptual design of the 20 mΩ dump resistor has been proposed. The required design aspects and a dimensional layout of the dump resistor for the new superconducting CS has been presented and discussed. The basic structure of the proposed dump resistor comprises of stainless steel grids connected in series in the form of meander to minimize the stray inductance and increase the surface area for cooling. Such an array of grids connected in series and parallel will cater to the electrical as well as thermal parameters. It will be cooled by natural convection. During operation, the estimated maximum temperature of the proposed dump resistor will raise upto 600 K.

  15. Vetiver Grass: a potential tool for phytoremediation of iron ore mine site spoil dump

    Directory of Open Access Journals (Sweden)

    Anita Mukherjee

    2015-06-01

    Full Text Available The impact of mining has lead to the generation of a large amount of spoil dumps that has become dangerous to human health, wildlife and biodiversity. Thus it is essential that the post mining areas and waste land generated need to be rapidly vegetated. Vetiver grass (Chrysopogon zizanioides (L. Roberty is a tropical plant which grows naturally in various soil conditions and is well known for its ability to resist DNA damage while growing on typically polluted soil conditions. The spoil dumps from the iron mine site is unstable and inhospitable for plant growth due to presence of various toxic heavy metals like - Fe, Mn, Zn, Cu, Pb, Ni, Cr, Cd etc. Vetiver system is an efficient bio-engineering tool for reclaiming such spoil dumps. There are 12 known species of Vetiver grass, and many hundreds of different cultivars that are exploited by users depending on need. In the present study we selected the polyploid infertile variety of vetiver and carried pot experiments. Vetiver plants grown on the iron ore mine spoil dump show distinct differences in their growth with fewer numbers of tillers, reduced chlorophyll content, upregulation of antioxidant enzymes and increased proline content. To investigate the level of DNA damage incurred and change in the genetic stability Comet assay and RAPD analysis were performed. Results confirmed that Vetiver grass can serve as a model species for phytoremediating the iron ore mine spoil dumps.

  16. Engineering aspects of particle-beam fusion systems

    International Nuclear Information System (INIS)

    Cook, D.L.

    1982-01-01

    The Department of Energy is supporting research directed toward demonstration of DT fuel ignition in an Inertial Confinement Fusion (ICF) capsule. As part of the ICF effort, two major Particle Beam Fusion Accelerators (PBFA I and II) are being developed at Sandia National Laboratories with the objective of providing energetic light ion beams of sufficient power density for target implosion. Supporting light ion beam research is being performed at the Naval Research Laboratory and at Cornell University. If the answers to several key physics and engineering questions are favorable, pulsed power accelerators will be able to provide an efficient and inexpensive approach to high target gain and eventual power production applications

  17. Optical diagnosis system for intense electron beam diode plasma

    International Nuclear Information System (INIS)

    Yang Jie; Shu Ting; Zhang Jun; Fan Yuwei; Yang Jianhua; Liu Lie; Yin Yi; Luo Ling

    2012-01-01

    A nanosecond time-resolved imaging platform for diode plasmas diagnostics has been constructed based on the pulsed electron beam accelerator and high speed framing camera (HSFC). The accelerator can provide an electrical pulse with voltages of 200-500 kV, rise-time (from 10% to 90% amplitude) of 25 ns and duration of 110 ns. The diode currents up to kA level can be extracted. The trigger signal for camera was picked up by a water-resistor voltage divider after the main switch of the accelerator, which could avoid the disadvantageous influence of the time jitter caused by the breakdown of the gas gaps. Then the sampled negative electrical pulse was converted into a transistor-transistor logic (TTL) signal (5 V) with rise time of about 1.5 ns and time jitter less than 1 ns via a processor. And this signal was taken as the synchronization time base. According to the working characteristics of the camera, the synchronization scheme relying mainly on electrical pulse delay method supplemented by light signal delay method was determined to make sure that the camera can work synchronously with the light production and transportation from the diode plasma within the time scale of nanosecond. Moreover, shielding and filtering methods were used to restrain the interference on the measurement system from the accelerator. Finally, time resolved 2-D framing images of the diode plasma were acquired. (authors)

  18. High-power beam combining: a step to a future laser weapon system

    Science.gov (United States)

    Protz, Rudolf; Zoz, Jürgen; Geidek, Franz; Dietrich, Stephan; Fall, Michael

    2012-11-01

    Due to the enormous progress in the field of high-power fiber lasers during the last years commercial industrial fiber lasers are now available, which deliver a near-diffraction limited beam with power levels up to10kW. For the realization of a future laser weapon system, which can be used for Counter-RAM or similar air defence applications, a laser source with a beam power at the level of 100kW or more is required. At MBDA Germany the concept for a high-energy laser weapon system is investigated, which is based on such existing industrial laser sources as mentioned before. A number of individual high-power fiber laser beams are combined together, using one common beam director telescope. By this "geometric" beam coupling scheme, sufficient laser beam power for an operational laser weapon system can be achieved. The individual beams from the different lasers are steered by servo-loops, using fast tip-tilt mirrors. This principle enables the concentration of the total laser beam power at the common focal point on a distant target, also allowing fine tracking of target movements and first order compensation of turbulence effects on laser beam propagation. The proposed beam combination concept was demonstrated using several experimental set-ups. Different experiments were performed, to investigate laser beam target interaction and target fine tracking also at large distances. Content and results of these investigations are reported. An example for the lay-out of an Air Defence High Energy Laser Weapon (ADHELW ) is given. It can be concluded, that geometric high-power beam combining is an important step for the realization of a laser weapon system in the near future.

  19. Experimental results of Tore Supra neutral beam injector in the line testing system

    International Nuclear Information System (INIS)

    Fumelli, M.; Jequier, F.

    1991-04-01

    Results of the tests carried out on one of the six Tore Supra neutral beam injectors are reported. Several minor modifications of the injector design allowed us to operate up to 92 keV - 30 A beams limited by the high voltage power supplies. Results of studies on different topics like new titanium pumping system, neutron yield from neutraliser and target, beam conditioning and breakdown statistical analysis are also reported [fr

  20. Development of a computerized tomographic system based on the FAN-BEAM technique

    International Nuclear Information System (INIS)

    Junqueira, M.M.; Santos, C.A.C.; Borges, J.C.

    1986-01-01

    The Nuclear Instrumentation Laboratory, at COPPE/UFRJ, concentrates its researches in the development of computerized tomographic systems, looking for applications in industrial and medical non destructive analysing techniques. In this work we have projected and constructed a tomographic prototype, based on the FAN-BEAM technique for irradiating the object under analysis. An algorithm previously developed to analyse parallel beams, was modified and adapted to the FAN-BEAM geometry. (Author) [pt

  1. Low-Energy Run of Fermilab Electron Cooler's Beam Generation System

    Energy Technology Data Exchange (ETDEWEB)

    Prost, L.R.; Shemyakin, A.; /Fermilab; Fedotov, A.; Kewisch, J.; /Brookhaven

    2011-03-14

    In the context of the evaluation of possibly using the Fermilab Electron Cooler for the proposed low-energy RHIC run at BNL, operating the cooler at 1.6 MeV electron beam energy was tested in a short beam line configuration. The main conclusion of this feasibility study is that the cooler's beam generation system is suitable for BNL needs. The beam recirculation was stable for all tested parameters. In particular, a beam current of 0.38 A was achieved with the cathode magnetic field up to the maximum value presently available of 250 G. The energy ripple was measured to be 40 eV. A striking difference with running the 4.3 MeV beam (nominal for operation at FNAL) is that no unprovoked beam recirculation interruptions were observed. Electron cooling proposed to increase the luminosity of the RHIC collider for heavy ion beam energies below 10 GeV/nucleon [1] needs a good quality, 0.9-5 MeV electron beam. Preliminary design studies indicate that the scheme of the Recycler's electron cooler at FNAL is suitable for low-energy RHIC cooling and most parts of the cooler can be re-used after the end of the Tevatron Run II. To analyze issues related to the generation of the electron beam in the energy recovery mode and to gain experience with the beam transport at lower beam energy, a dedicated study was performed at FNAL with a beam run through a short beam line (so called U-bend). This report summarizes our findings and observations in the course of the measurements.

  2. SSC detector muon sub-system beam tests

    International Nuclear Information System (INIS)

    Downing, R.; Errede, S.; Gauthier, A.; Haney, M.; Karliner, I.; Liss, T.; O'Halloran, T.; Sheldon, P.; Simiatis, V.; Thaler, J.; Wiss, J.; Kunori, S.; Skuja, A.; Davisson, R.; Liang, G.; Lubatti, H.; Wilkes, R.; Zhao, T.; Carlsmith, D.

    1993-01-01

    We propose to start a test-beam experiment at Fermilab studying the problems associated with tracking extremely high energy muons through absorbers. We anticipate that in this energy range the observation of the muons will be complicated by associated electromagnetic radiation Monte Carlo simulations of this background need to be tuned by direct observations. These beam tests are essential to determine important design parameters of a SSC muon detector, such as the choice of the tracking, geometry, hardware triggering schemes, the number of measuring stations, the amount of iron between measuring stations, etc. We intend to begin the first phase of this program in November of 1990 utilizing the Tevatron muon beam. We plan to measure the multiplicity, direction, and separation of secondary particles associated with the primary muon track as it emerges from an absorber. The second phase of beam test in 1992 or later will be a full scale test for the final design chosen in our muon subsystem proposal

  3. Performance of the beam pulsing system of the 15 UD Pelletron accelerator at Nuclear Science Centre

    International Nuclear Information System (INIS)

    Joshi, R.; Barua, P.; Jha, V.; Sarkar, A.; Ghosh, S.; Bhowmik, R.K.

    1997-01-01

    The Electrostatic International Incorporation (EII), USA supplied beam pulsing system of the 15 UD Pelletron accelerator at Nuclear Science Centre consists of mainly three components viz. a chopper, a travelling wave deflector (TWD) and a buncher. The chopper is used to chop the dc beam into small portions at the repetition rate of 4 MHz. The function of TWD is to achieve the eleven different repetition rates other than 4 MHz and the buncher finally bunches the chopped beam from the chopper. The performance of this beam pulsing system improved considerably after incorporating a line voltage stabilizer to the system electronics and modifying the feedback loop of the system. The performance of TWD was also improved after some modification in its operation and adding an interlock circuit to TWD electronics. A spiral cavity is now installed in the vault area after the analyzing magnet for the efficient measurement of time resolution of the pulsed beam. (author). 2 refs., 4 figs., 1 tab

  4. Low energy and high energy dumps for ELI-NP accelerator facility: rational and Monte-Carlo calculations - results

    Science.gov (United States)

    Esposito, A.; Frasciello, O.; Pelliccioni, M.

    2017-09-01

    ELI-NP will be a new international research infrastructure facility for laser-based Nuclear Physics to be built in Magurele, south west of Bucharest, Romania. For the machine to operate as an intense γ rays' source based on Compton back-scattering, electron beams are employed, undergoing a two stage acceleration to 320 MeV and 740 MeV (and, with an eventual energy upgrade, also to 840 MeV) beam energies. In order to assess the radiation safety issues, concerning the effectiveness of the dumps in absorbing the primary electron beams, the generated prompt radiation field and the residual dose rates coming from the activation of constituent materials, as well as the shielding of the adjacent environments against both prompt and residual radiation fields, an extensive design study by means of Monte Carlo simulations with FLUKA code was performed, for both low energy 320 MeV and high energy 720 MeV (840 MeV) beam dumps. For the low energy dump we discuss also the rational of the choice to place it in the building basement, instead of installing it in one of the shielding wall at the machine level, as it was originally conceived. Ambient dose equivalent rate constraints, according to the Rumenian law in force in radiation protection matter were 0.1 /iSv/h everywhere outside the shielding walls and 1.4 μiSv/h outside the high energy dump area. The dumps' placements and layouts are shown to be fully compliant with the dose constraints and environmental impact.

  5. Design and initial tests of beam current monitoring systems for the APS transport lines

    International Nuclear Information System (INIS)

    Wang, Xucheng.

    1992-01-01

    The non-intercepting beam current monitoring systems suitable for a wide, range of beam parameters have been developed for the Advanced Photon Source (APS) low energy transport lines and high energy transport line. The positron or electron beam pulse in the transport lines wig have peak beam currents ranging from 8 mA to 29 A with pulse widths varying from 120 ps to 30 ns and pulse repetition rates from 2 Hz to 60 Hz. The peak beam current or total beam charge is measured with the fast or integrating current transformer, respectively, manufactured by Bergoz. In-house high speed beam signal processing electronics provide a DC level output proportional to the peak current or total charge for the digitizer input. The prototype systems were tested on the linacs which have beam pulse structures similar to that of the APS transport lines. This paper describes the design of beam signal processing electronics and grounding and shielding methods for current transformers. The results of the initial operations are presented. A short introduction on the preliminary design of current monitoring systems for the APS rings is also included

  6. Dump truck-related deaths in construction, 1992-2007.

    Science.gov (United States)

    McCann, Michael; Cheng, Mei-Tai

    2012-05-01

    Dump trucks are universally used in construction and other industries to haul materials to the location and to remove waste materials. The source for dump truck-related fatality data was the Bureau of Labor Statistics Census of Fatal Occupational Injuries (CFOI) Research File. From 1992 to 2007, 829 construction workers were killed in dump truck-related incidents nationwide. Of those, 336 were dump truck operators with 215 deaths occurring in street and highway incidents. Another 343 deaths involved workers on foot, three-quarters struck by dump trucks. Sixty-four of the construction workers killed were maintaining dump trucks, 22 when caught between the truck frame and a falling dump truck bed. Of the 86 other deaths, 55 involved streets and highways. Recommendations include: (i) improving the reporting of seat belt usage in fatality reports; (ii) requiring use of seat belts; (iii) requiring the use of backup alarms, spotters, or other methods to alert dump truck operators to workers in their blind spots; (iv) prohibiting direct dumping at river banks and embankments; (v) using cameras or radar to enforce stopping at railway crossings; and (xi) enforcing worker safety practices (e.g., lockout/tagout procedures on elevated dump truck beds). Copyright © 2011 Wiley Periodicals, Inc.

  7. An Innovative Beam Halo Monitor system for the CMS experiment at the LHC: Design, Commissioning and First Beam Results

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00344917; Dabrowski, Anne

    The Compact Muon Solenoid (CMS) is a multi-purpose experiment situated at the Large Hadron Collider (LHC). The CMS has the mandate of searching new physics and making precise measurements of the already known mechanisms by using data produced by collisions of high-energy particles. To ensure high quality physics data taking, it is important to monitor and ensure the quality of the colliding particle beams. This thesis presents the research and design, the integration and the first commissioning results of a novel Beam Halo Monitor (BHM) that was designed and built for the CMS experiment. The BHM provides an online, bunch-by-bunch measurement of background particles created by interactions of the proton beam with residual gas molecules in the vacuum chamber or with collimator material upstream of the CMS, separately for each beam. The system consists of two arrays of twenty direction-sensitive detectors that are distributed azimuthally around the outer forward shielding of the CMS experiment. Each detector is ...

  8. Redox chemistry of sulphate and uranium in a phosphogypsum tailings dump.

    Science.gov (United States)

    Papanicolaou, Fanos; Antoniou, Stella; Pashalidis, Ioannis

    2010-08-01

    The present study aims to assess the effect of redox conditions existing within the tailings dump on the stability of phosphogypsum (e.g. sulphate reduction) and uranium(VI). Phosphogypsum sampling and in-situ measurements were carried out at a coastal tailings dump in Vasiliko Cyprus, pH, E(H) and solubility experiments were performed in simulated laboratory systems and thermodynamic calculations using MINTEQA2. Generally, in the open tailings dump oxidizing conditions predominate stabilizing sulphur and uranium in their hexavalent oxidation states. On the other hand, after the application of a soil/vegetative cover and in the presence of natural organic matter, anoxic conditions prevail (E(H) phosphogypsum resulting in enhanced erosion of the material by rain- and seawater and washing out of contaminants in particulate/colloidal form. Copyright 2010 Elsevier Ltd. All rights reserved.

  9. The beam intensity and positron monitoring system of the Daresbury Electron Synchrotron (NINA)

    International Nuclear Information System (INIS)

    Poole, D.E.; Ring, T.; Peters, D.G.; Allen, J.

    1976-01-01

    The beam sensing system of NINA has been redesigned and rebuilt to provide comprehensive monitoring of beam intensity and position. The reasons for the change are stated, and the requirements and performance specification for the new system are listed. The report falls under the following heads: the sensing head; the head electronics unit; the line receiver unit; performance of installed monitors; display system and computer interface. The performance of the new system is summarized. (U.K.)

  10. System Architecture for measuring and monitoring Beam Losses in the Injector Complex at CERN

    CERN Document Server

    Zamantzas, C; Dehning, B; Jackson, S; Kwiatkowski, M; Vigano, W

    2012-01-01

    The strategy for beam setup and machine protection of the accelerators at the European Organisation for Nuclear Research (CERN) is mainly based on its Beam Loss Monitoring (BLM) systems. For their upgrade to higher beam energies and intensities, a new BLM system is under development with the aim of providing faster measurement updates with higher dynamic range and the ability to accept more types of detectors as input compared to its predecessors. In this paper, the architecture of the complete system is explored giving an insight to the design choices made to provide a highly reconfigurable system that is able to fulfil the different requirements of each accelerator using reprogrammable devices.

  11. Requirements and guidelines for NSLS experimental beam line vacuum systems: Revision A

    Energy Technology Data Exchange (ETDEWEB)

    Foerster, C.; Halama, H.; Thomlinson, W.

    1986-10-01

    Requirements are provided for NSLS beam line front ends and vacuum interlocks. Guidelines are provided for UHV beam line vacuum systems, including materials, vacuum hardware (pumps, valves, and flanges), acoustic delay lines and beam line fast valves, instrumentation, fabrication and testing, and the NSLS cleaning facility. Also discussed are the design review for experimenters' equipment that would be connected to the NSLS and acceptance tests for any beam line to be connected with the ring vacuum. Also appended are a description of the acoustic delay line as well as the NSLS vacuum standards and NSLS procedures. (LEW)

  12. Requirements and guidelines for NSLS experimental beam line vacuum systems: Revision A

    International Nuclear Information System (INIS)

    Foerster, C.; Halama, H.; Thomlinson, W.

    1986-10-01

    Requirements are provided for NSLS beam line front ends and vacuum interlocks. Guidelines are provided for UHV beam line vacuum systems, including materials, vacuum hardware (pumps, valves, and flanges), acoustic delay lines and beam line fast valves, instrumentation, fabrication and testing, and the NSLS cleaning facility. Also discussed are the design review for experimenters' equipment that would be connected to the NSLS and acceptance tests for any beam line to be connected with the ring vacuum. Also appended are a description of the acoustic delay line as well as the NSLS vacuum standards and NSLS procedures

  13. Machine Protection and Interlock Systems for Circular Machines - Example for LHC

    CERN Document Server

    Schmidt, R.

    2016-01-01

    This paper introduces the protection of circular particle accelerators from accidental beam losses. Already the energy stored in the beams for accelerators such as the TEVATRON at Fermilab and Super Proton Synchrotron (SPS) at CERN could cause serious damage in case of uncontrolled beam loss. With the CERN Large Hadron Collider (LHC), the energy stored in particle beams has reached a value two orders of magnitude above previous accelerators and poses new threats with respect to hazards from the energy stored in the particle beams. A single accident damaging vital parts of the accelerator could interrupt operation for years. Protection of equipment from beam accidents is mandatory. Designing a machine protection system requires an excellent understanding of accelerator physics and operation to anticipate possible failures that could lead to damage. Machine protection includes beam and equipment monitoring, a system to safely stop beam operation (e.g. extraction of the beam towards a dedicated beam dump block o...

  14. Design of RF chopper system for improving beam quality in FEL injector with thermionic gun

    International Nuclear Information System (INIS)

    Chen, Q.; Qin, B.; Tan, P.; Hu, T.; Pei, Y.; Zhang, F.

    2014-01-01

    For a linac-based Free Electron Laser (FEL), good beam quality largely contributes to the success of the final radiation. An imperfection confronted with the HUST THz-FEL facility is the long beam tail that emerges in the electron gun and exists through the whole beam line. This paper proposes to deploy a chopper system after the electron gun to truncate the beam tails before they enter into the linac. Physical dimensions of the chopper cavity are discussed in detail and we have developed and derived new analytical expressions applying to all frequencies for the optimal design. Also, technical issues of the cavity are considered. Beam dynamic simulation is performed to examine the truncation effect and the results show that more than 78% of the beam tail can be removed effectively, while preserving the emittance and energy spread in acceptable level

  15. Progress in the design of the ITER Neutral Beam cell Remote Handling System

    Energy Technology Data Exchange (ETDEWEB)

    Shuff, R., E-mail: robin.shuff@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Van Uffelen, M.; Damiani, C. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Tesini, A.; Choi, C.-H. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France); Meek, R. [Oxford Technologies Limited, 7 Nuffield Way, Abingdon OX14 1RL (United Kingdom)

    2014-10-15

    The ITER Neutral Beam cell will include a suite of Remote Handling equipment for maintenance tasks. This paper summarises the current status and recent developments in the design of the ITER Neutral Beam Remote Handling System. Its concept design was successfully completed in July 2012 by CCFE in the frame of a grant agreement with F4E, in collaboration with the ITER Organisation, including major systems like monorail crane, Beam Line Transporter, beam source equipment, upper port and neutron shield equipment and associated tooling. Research and development activities are now underway on the monorail crane radiation hardened on-board control system and first of a kind remote pipe and lip seal maintenance tooling for the beam line vessel, reported in this paper.

  16. The Wigner distribution function of a super Lorentz—Gauss SLG11 beam through a paraxial ABCD optical system

    International Nuclear Information System (INIS)

    Zhou Yi-Min; Zhou Guo-Quan

    2013-01-01

    An orthonormal beam family of super Lorentz—Gauss (SLG) beam model is proposed to describe the higher-order mode beams with high divergence, which are generated by a high power diode laser. Here we consider the simplest case of the SLG beams, where there are four mutually orthogonal SLG beams, namely SLG 00 , SLG 01 , SLG 10 , and SLG 11 beams. The SLG 00 beam is just the Lorentz—Gauss beam. Based on the Collins integral formula and the Hermite—Gaussian expansion of a Lorentz function, an analytical expression for the Wigner distribution function (WDF) of an SLG 11 beam through a paraxial ABCD optical system is derived. The properties of the WDF of an SLG 11 beam propagating in free space are demonstrated. The normalized WDFs of an SLG 11 beam at the different spatial points are depicted in several observation planes. The influence of the beam parameter on the WDF of an SLG 11 beam in free space is analyzed at different propagation distances. The second-order moments of the WDF of an SLG 11 beam in free space are also examined. This research reveals the propagation properties of an SLG 11 beam from another perspective. The WDFs of SLG 01 and SLG 10 beams can be easily obtained by using the WDFs of Lorentz—Gauss beam and the SLG 11 beam. (electromagnetism, optics, acoustics, heat transfer, classical mechanics, and fluid dynamics)

  17. Operating characteristics of a new ion source for KSTAR neutral beam injection system.

    Science.gov (United States)

    Kim, Tae-Seong; Jeong, Seung Ho; Chang, Doo-Hee; Lee, Kwang Won; In, Sang-Ryul

    2014-02-01

    A new positive ion source for the Korea Superconducting Tokamak Advanced Research neutral beam injection (KSTAR NBI-1) system was designed, fabricated, and assembled in 2011. The characteristics of the arc discharge and beam extraction were investigated using hydrogen and helium gas to find the optimum operating parameters of the arc power, filament voltage, gas pressure, extracting voltage, accelerating voltage, and decelerating voltage at the neutral beam test stand at the Korea Atomic Energy Research Institute in 2012. Based on the optimum operating condition, the new ion source was then conditioned, and performance tests were primarily finished. The accelerator system with enlarged apertures can extract a maximum 65 A ion beam with a beam energy of 100 keV. The arc efficiency and optimum beam perveance, at which the beam divergence is at a minimum, are estimated to be 1.0 A/kW and 2.5 uP, respectively. The beam extraction tests show that the design goal of delivering a 2 MW deuterium neutral beam into the KSTAR Tokamak plasma is achievable.

  18. Beam-transport system for high-resolution heavy-ion spectroscopy

    International Nuclear Information System (INIS)

    Roussel, P.; Kashy, E.

    1980-01-01

    A method is given to adjust a beam-transport system to the requirements of high-energy resolution heavy-ion spectroscopy. The results of a test experiment performed on a MP tandem with a 12 C beam are shown. A drastic improvement in energy resolution is obtained for a kinematical factor K=1/p dp/dtheta=0.12 [fr

  19. Periodic solutions of a multi-DOF beam system with impact

    NARCIS (Netherlands)

    Vorst, E.L.B. van de; Campen, D.H. van; Kraker, A. de; Fey, R.H.B

    1996-01-01

    The steady state behaviour is analyzed of a periodically driven multi-DOF beam system which has an elastic stop at its middle. The elastic stop is modelled in a continuous way by using the contact law of Hertz. The beam is modelled by using finite elements and subsequently reduced by using a

  20. In-service performance evaluation and monitoring of a hybrid composite beam bridge system : final report.

    Science.gov (United States)

    2017-10-01

    The hybrid composite beam (HCB) technology has been presented as a system for short and medium span beam bridges as an alternative to traditional materials such as concrete and steel. An HCB consists of a concrete tied arch encased in a fiber reinfor...

  1. Performance requirements of the MedAustron beam delivery system

    CERN Document Server

    AUTHOR|(CDS)2073034

    The Austrian hadron therapy center MedAustron is currently under construction with patient treatment planned to commence in 2015. Tumors will be irradiated using proton and carbon ions, for which the steeply rising Bragg curve and finite range offer a better conformity of the dose to the geometrical shape of the tumor compared to conventional photon irradiation. The current trend is to move from passive scattering toward active scanning using a narrow pencil beam in order to reach an even better dose conformation and limit the need of patient specific hardware. The quality of the deposited dose will ultimately depend on the performance of the beam delivery chain: beam profile and extraction stability of the extracted beam, accuracy and ramp rate of the scanning magnet power supplies, and precision of the beam monitors used for verifying the delivered dose. With a sharp lateral penumbra, the transverse dose fall-off can be minimized. This is of particular importance in situations where the lesion is adjace...

  2. REQUIREMENTS AND GUIDELINES FOR NSLS EXPERIMENTAL BEAM LINE VACUUM SYSTEMS-REVISION B.

    Energy Technology Data Exchange (ETDEWEB)

    FOERSTER,C.

    1999-05-01

    Typical beam lines are comprised of an assembly of vacuum valves and shutters referred to as a ''front end'', optical elements to monochromatize, focus and split the photon beam, and an experimental area where a target sample is placed into the photon beam and data from the interaction is detected and recorded. Windows are used to separate sections of beam lines that are not compatible with storage ring ultra high vacuum. Some experimental beam lines share a common vacuum with storage rings. Sections of beam lines are only allowed to vent up to atmospheric pressure using pure nitrogen gas after a vacuum barrier is established to protect ring vacuum. The front end may only be bled up when there is no current in the machine. This is especially true on the VUV storage ring where for most experiments, windows are not used. For the shorter wavelength, more energetic photons of the x-ray ring, beryllium windows are used at various beam line locations so that the monochromator, mirror box or sample chamber may be used in a helium atmosphere or rough vacuum. The window separates ring vacuum from the environment of the downstream beam line components. The stored beam lifetime in the storage rings and the maintenance of desirable reflection properties of optical surfaces depend upon hydrocarbon-free, ultra-high vacuum systems. Storage ring vacuum systems will operate at pressures of {approximately} 1 x 10{sup {minus}10} Torr without beam and {approximately} 1 x 10{sup {minus}9} Torr with beam. Systems are free of hydrocarbons in the sense that no pumps, valves, etc. containing organics are used. Components are all-metal, chemically cleaned and bakeable. To the extent that beam lines share a common vacuum with the storage ring, the same criteria will hold for beam line components. The design philosophy for NSLS beam lines is to use all-metal, hydrocarbon-free front end components and recommend that experimenters use this approach for common vacuum hardware

  3. REQUIREMENTS AND GUIDELINES FOR NSLS EXPERIMENTAL BEAM LINE VACUUM SYSTEMS-REVISION B

    International Nuclear Information System (INIS)

    FOERSTER, C.

    1999-01-01

    Typical beam lines are comprised of an assembly of vacuum valves and shutters referred to as a ''front end'', optical elements to monochromatize, focus and split the photon beam, and an experimental area where a target sample is placed into the photon beam and data from the interaction is detected and recorded. Windows are used to separate sections of beam lines that are not compatible with storage ring ultra high vacuum. Some experimental beam lines share a common vacuum with storage rings. Sections of beam lines are only allowed to vent up to atmospheric pressure using pure nitrogen gas after a vacuum barrier is established to protect ring vacuum. The front end may only be bled up when there is no current in the machine. This is especially true on the VUV storage ring where for most experiments, windows are not used. For the shorter wavelength, more energetic photons of the x-ray ring, beryllium windows are used at various beam line locations so that the monochromator, mirror box or sample chamber may be used in a helium atmosphere or rough vacuum. The window separates ring vacuum from the environment of the downstream beam line components. The stored beam lifetime in the storage rings and the maintenance of desirable reflection properties of optical surfaces depend upon hydrocarbon-free, ultra-high vacuum systems. Storage ring vacuum systems will operate at pressures of ∼ 1 x 10 -10 Torr without beam and ∼ 1 x 10 -9 Torr with beam. Systems are free of hydrocarbons in the sense that no pumps, valves, etc. containing organics are used. Components are all-metal, chemically cleaned and bakeable. To the extent that beam lines share a common vacuum with the storage ring, the same criteria will hold for beam line components. The design philosophy for NSLS beam lines is to use all-metal, hydrocarbon-free front end components and recommend that experimenters use this approach for common vacuum hardware downstream of front ends. O-ring-sealed valves, if used, are not

  4. Baseball II-T multiple beam project 50 kV, 80 amp, power supply system for sustaining neutral beam sources

    International Nuclear Information System (INIS)

    Waugh, A.F.

    1976-01-01

    This document describes a high power, high voltage power supply system required to operate sustaining neutral beam (NB) sources as would be used in the Baseball II-T Multiple Beam Project. Two such systems would be needed. Appended are site plan installation drawings

  5. Performance of a high resolution cavity beam position monitor system

    International Nuclear Information System (INIS)

    Walston, Sean; Boogert, Stewart; Chung, Carl; Fitsos, Pete; Frisch, Joe; Gronberg, Jeff; Hayano, Hitoshi; Honda, Yosuke; Kolomensky, Yury; Lyapin, Alexey; Malton, Stephen; May, Justin; McCormick, Douglas; Meller, Robert; Miller, David; Orimoto, Toyoko; Ross, Marc; Slater, Mark; Smith, Steve; Smith, Tonee; Terunuma, Nobuhiro; Thomson, Mark; Urakawa, Junji; Vogel, Vladimir; Ward, David; White, Glen

    2007-01-01

    It has been estimated that an RF cavity Beam Position Monitor (BPM) could provide a position measurement resolution of less than 1nm. We have developed a high resolution cavity BPM and associated electronics. A triplet comprised of these BPMs was installed in the extraction line of the Accelerator Test Facility (ATF) at the High Energy Accelerator Research Organization (KEK) for testing with its ultra-low emittance beam. The three BPMs were each rigidly mounted inside an alignment frame on six variable-length struts which could be used to move the BPMs in position and angle. We have developed novel methods for extracting the position and tilt information from the BPM signals including a robust calibration algorithm which is immune to beam jitter. To date, we have demonstrated a position resolution of 15.6nm and a tilt resolution of 2.1μrad over a dynamic range of approximately +/-20μm

  6. Performance of a High Resolution Cavity Beam Position Monitor System

    Energy Technology Data Exchange (ETDEWEB)

    Walston, S; Boogert, S; Chung, C; Fitsos, P; Frisch, J; Gronberg, J; Hayano, H; Honda, Y; Kolomensky, Y; Lyapin, A; Malton, S; May, J; McCormick, D; Meller, R; Miller, D; Orimoto, T; Ross, M; Slater, M; Smith, S; Smith, T; Terunuma, N; Thomson, M; Urakawa, J; Vogel, V; Ward, D; White, G

    2006-12-18

    It has been estimated that an RF cavity Beam Position Monitor (BPM) could provide a position measurement resolution of less than one nanometer. We have developed a high resolution cavity BPM and associated electronics. A triplet comprised of these BPMs was installed in the extraction line of the Accelerator Test Facility (ATF) at the High Energy Accelerator Research Organization (KEK) for testing with its ultra-low emittance beam. The three BPMs were each rigidly mounted inside an alignment frame on six variable-length struts which could be used to move the BPMs in position and angle. We have developed novel methods for extracting the position and tilt information from the BPM signals including a robust calibration algorithm which is immune to beam jitter. To date, we have demonstrated a position resolution of 15.6 nm and a tilt resolution of 2.1 {micro}rad over a dynamic range of approximately {+-} 20 {micro}m.

  7. Performance of a High Resolution Cavity Beam Position Monitor System

    Energy Technology Data Exchange (ETDEWEB)

    Walston, Sean; Boogert, Stewart; Chung, Carl; Fitsos, Joe; Frisch, Joe; Gronberg, Jeff; Hayano, Hitoshi; Honda, Yosuke; Kolomensky, Yury; Lyapin, Alexey; Malton, Stephen; May, Justin; McCormick, Douglas; Meller, Robert; Miller, David John; Orimoto, Toyoko; Ross, Marc; Slater, Mark; Smith, Steve; Smith, Tonee; Terunuma, Nobuhiro; /Fermilab /UC,

    2007-06-08

    It has been estimated that an RF cavity Beam Position Monitor (BPM) could provide a position measurement resolution of less than one nanometer. We have developed a high resolution cavity BPM and associated electronics. A triplet comprised of these BPMs was installed in the extraction line of the Accelerator Test Facility (ATF) at the High Energy Accelerator Research Organization (KEK) for testing with its ultra-low emittance beam. The three BPMs were each rigidly mounted inside an alignment frame on six variable-length struts which could be used to move the BPMs in position and angle. We have developed novel methods for extracting the position and tilt information from the BPM signals including a robust calibration algorithm which is immune to beam jitter. To date, we have demonstrated a position resolution of 15.6 nm and a tilt resolution of 2.1 {mu}rad over a dynamic range of approximately {+-} 20 {mu}m.

  8. The upgraded data acquisition system for beam loss monitoring at the Fermilab Tevatron and Main Injector

    International Nuclear Information System (INIS)

    Baumbaugh, A.; Briegel, C.; Brown, B.C.; Capista, D.; Drennan, C.; Fellenz, B.; Knickerbocker, K.; Lewis, J.D.; Marchionni, A.; Needles, C.; Olson, M.

    2011-01-01

    A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. The system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.

  9. Dynamic Stresses in the LHC TCDS Diluter from 7 TeV Beam Loading

    CERN Document Server

    Goddard, B; Presland, A; Weterings, W

    2006-01-01

    In the event of an unsynchronised beam abort, the MSD extraction septum of the LHC beam dumping system is protected from damage by the TCDS diluter. The simultaneous constraints of obtaining sufficient beam dilution while ensuring the survival of the TCDS make the design difficult, with high thermally induced dynamic stresses occurring in the material needed to attenuate the particle showers induced by the primary beam impact. In this paper, full 3D simulations are described where the worst-case beam loading has been used to generate the local temperature rise and to follow the resulting time evolution of the mechanical stresses. The results and the accompanying design changes for the TCDS, to provide an adequate performance margin, are detailed.

  10. Low energy ion beam systems for surface analytical and structural studies

    International Nuclear Information System (INIS)

    Nelson, G.C.

    1980-01-01

    This paper reviews the use of low energy ion beam systems for surface analytical and structural studies. Areas where analytical methods which utilize ion beams can provide a unique insight into materials problems are discussed. The design criteria of ion beam systems for performing materials studies are described and the systems now being used by a number of laboratories are reviewed. Finally, several specific problems are described where the solution was provided at least in part by information provided by low energy ion analysis techniques

  11. A beam position measurement system using quadrupole magnets magnetic centra as the position reference

    International Nuclear Information System (INIS)

    Roejsel, P.

    1994-01-01

    This measurement system uses a method to measure the beam position with high precision in a storage ring with respect to the quadrupole magnets magnetic centra that is used as the absolute position reference. The absolute position of the pickup elements does not affect the beam position measurements so a calibration of the pickup elements absolute position can be done in situ. This paper describes the system, and shows results from a working system at the MAX I storage ring. (orig.)

  12. Firebird Database Backup by Serialized Database Table Dump

    OpenAIRE

    Ling, Maurice HT

    2007-01-01

    This paper presents a simple data dump and load utility for Firebird databases which mimics mysqldump in MySQL. This utility, fb_dump and fb_load, for dumping and loading respectively, retrieves each database table using kinterbasdb and serializes the data using marshal module. This utility has two advantages over the standard Firebird database backup utility, gbak. Firstly, it is able to backup and restore single database tables which might help to recover corrupted databases. Secondly, the ...

  13. Impact of large beam-induced heat loads on the transient operation of the beam screens and the cryogenic plants of the Future Circular Collider (FCC)

    Science.gov (United States)

    Correia Rodrigues, H.; Tavian, L.

    2017-12-01

    The Future Circular Collider (FCC) under study at CERN will produce 50-TeV high-energy proton beams. The high-energy particle beams are bent by 16-T superconducting dipole magnets operating at 1.9 K and distributed over a circumference of 80 km. The circulating beams induce 5 MW of dynamic heat loads by several processes such as synchrotron radiation, resistive dissipation of beam image currents and electron clouds. These beam-induced heat loads will be intercepted by beam screens operating between 40 and 60 K and induce transients during beam injection. Energy ramp-up and beam dumping on the distributed beam-screen cooling loops, the sector cryogenic plants and the dedicated circulators. Based on the current baseline parameters, numerical simulations of the fluid flow in the cryogenic distribution system during a beam operation cycle were performed. The effects of the thermal inertia of the headers on the helium flow temperature at the cryogenic plant inlet as well as the temperature gradient experienced by the beam screen has been assessed. Additionally, this work enabled a thorough exergetic analysis of different cryogenic plant configurations and laid the building-block for establishing design specification of cold and warm circulators.

  14. Indium-tin-oxide thin film deposited by a dual ion beam assisted e-beam evaporation system

    International Nuclear Information System (INIS)

    Bae, J.W.; Kim, J.S.; Yeom, G.Y.

    2001-01-01

    Indium-tin-oxide (ITO) thin films were deposited on polycarbonate (PC) substrates at low temperatures (<90 deg. C) by a dual ion beam assisted e-beam evaporation system, where one gun (gun 1) is facing ITO flux and the other gun (gun 2) is facing the substrate. In this experiment, effects of rf power and oxygen flow rate of ion gun 2 on the electrical and optical properties of depositing ITO thin films were investigated. At optimal deposition conditions, ITO thin films deposited on the PC substrates larger than 20 cmx20 cm showed the sheet resistance of less than 40 Ω/sq., the optical transmittance of above 90%, and the uniformity of about 5%

  15. TRANSPORT: a computer program for designing charged particle beam transport systems

    International Nuclear Information System (INIS)

    Brown, K.L.; Rothacker, F.; Carey, D.C.; Iselin, C.

    1977-05-01

    TRANSPORT is a first- and second-order matrix multiplication computer program intended for the design of static-magnetic beam transport systems. It has been in existence in various evolutionary versions since 1963. The present version, described in the manual given, includes both first- and second-order fitting capabilities. TRANSPORT will step through the beam line, element by element, calculating the properties of the beam or other quantities, described below, where requested. Therefore one of the first elements is a specification of the phase space region occupied by the beam entering the system. Magnets and intervening spaces and other elements then follow in the sequence in which they occur in the beam line. Specifications of calculations to be done or of configurations other than normal are placed in the same sequence, at the point where their effect is to be made

  16. Explicit formulation for natural frequencies of double-beam system with arbitrary boundary conditions

    Energy Technology Data Exchange (ETDEWEB)

    Mirzabeigy, Alborz; Madoliat, Reza [Iran University of Science and Technology, Narmak, Tehran (Iran, Islamic Republic of); Dabbagh, Vahid [University of Malaya, Kuala Lumpur (Malaysia)

    2017-02-15

    In this paper, free transverse vibration of two parallel beams connected through Winkler type elastic layer is investigated. Euler- Bernoulli beam hypothesis has been applied and it is assumed that boundary conditions of upper and lower beams are similar while arbitrary without any limitation even for non-ideal boundary conditions. Material properties and cross-section geometry of beams could be different from each other. The motion of the system is described by a homogeneous set of two partial differential equations, which is solved by using the classical Bernoulli-Fourier method. Explicit expressions are derived for the natural frequencies. In order to verify accuracy of results, the problem once again solved using modified Adomian decomposition method. Comparison between results indicates excellent accuracy of proposed formulation for any arbitrary boundary conditions. Derived explicit formulation is simplest method to determine natural frequencies of double-beam systems with high level of accuracy in comparison with other methods in literature.

  17. Analysis of a High Speed Electron Beam Deflection System

    Czech Academy of Sciences Publication Activity Database

    Zobač, Martin

    2009-01-01

    Roč. 44, 5-6 (2009), s. 59-63 ISSN 0861-4717 Institutional research plan: CEZ:AV0Z20650511 Keywords : electron beam deflection * transfer function * eddy - current * hysteresis * instability Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering

  18. Mobilization and transport of pollutants in an abandoned dump in tropical conditions

    Science.gov (United States)

    Pelinson, Natalia; Shinzato, Marjolly; Wendland, Edson

    2017-04-01

    The valuation and treatment techniques of municipal solid waste (MSW) in developing countries are not sufficiently developed, and therefore, the volume of waste destined for disposal still presents significant amounts. In Brazil, the more common practice of final destination is the deposition on the soil, due to its simple operation and low cost compared to other techniques. One of the most serious negative environmental impacts in the irregular disposal of solid waste is the contamination of soil and groundwater by waste leachates. The final disposal in dumps is forbidden by Brazilian law since 2010, nevertheless, the public administration is not prepared to monitor waste disposal areas and the risk of contamination of water. In this sense, a research has been developed in an abandoned dump installed over an outcrop of the Botucatu Formation, which is part of the Guarani Aquifer System (SAG) and therefore, is an area of high water vulnerability. In this dump, an old gully was used as a final waste disposal area for urban, construction and demolition, medical and industrial waste from 1980 to 1996. Since the end of the deposition, the waste body is kept with inefficient hydraulic control. The water infiltration due to rainfall promotes the mobility of contaminant in the deposit. The present water quality in the dump has been monitored through physical and chemical analysis of samples collected in the unsaturated zone (inside the waste mass using vacuum lysimeters) and in the saturated zone (monitoring wells). The rainfall variation observed in the years 2014 (dry year) and 2015 (wet year) contributed significantly to evaluate the mobilization of pollutants within the dump. The reduction of the water volume that infiltrates the waste mass affected the quality of the leachate collected in the lysimeters. The groundwater collected in monitoring wells outside the dump area presents low turbidity values (1000 µS.cma-1 in leachate) and chlorides values (>800 mg.L-1

  19. Modeling of a light elastic beam by a system of rigid bodies

    Directory of Open Access Journals (Sweden)

    Šalinić Slaviša

    2004-01-01

    Full Text Available This paper has shown that a light elastic beam, in the case of small elastic deformations, can be modeled by a kinematic chain without branching composed of rigid bodies which are connected by passive revolute or prismatic joints with corresponding springs in them. Elastic properties of the beam are modeled by the springs introduced. The potential energy of the elastic beam is expressed as a function of components of the vector of elastic displacement and the vector of elastic rotation calculated for the elastic centre of the beam, which results in the diagonal stiffness matrix of the beam. As the potential energy of the introduced system of bodies with springs is expressed in the function of relative joint displacements, the diagonal stiffness matrix is obtained. In addition, these two stiffness matrices are equal. The modeling process has been demonstrated on the example of an elastic beam rotating about a fixed vertical axis, with a rigid body whose mass is considerably larger than the beam mass fixed to its free end. Differential equations of motion have been formed for this mechanical system. The modeling technique described here aims at expanding of usage of well developed methods of dynamics of systems of rigid bodies to the analysis of systems with elastic bodies. .

  20. Development of a raster electronics system for expanding the APT proton beam

    International Nuclear Information System (INIS)

    Chapelle, S.; Hubbard, E.L.; Smith, T.L.; Schulze, M.E.; Shafer, R.E.

    1998-01-01

    A 1700 MeV, 100 mA proton linear accelerator is being designed for Accelerator Production of Tritium (APT). A beam expansion system is required to uniformly irradiate a 19 x 190 cm tritium production target. This paper describes a beam expansion system consisting of eight ferrite dipole magnets to raster the beam in the x- and y-planes and also describes the salient features of the design of the electronics that are unique to the expander. Eight Insulated Gate Bipolar Transistor (IGBT)-based modulators drive the raster magnets with triangular current waveforms that are synchronized using phase-locked loops (PLLs) and voltage controlled crystal oscillators (VCXOs). Fault detection circuitry shuts down the beam before the target can be damaged by a failure of the raster system. Test data are presented for the prototype system

  1. A fluorescent screen + CCD system for quality assurance of therapeutic scanned ion beams

    Energy Technology Data Exchange (ETDEWEB)

    Takeshita, E., E-mail: eriuli@nirs.go.jp [National Institute of Radiological Sciences, Chiba (Japan); Furukawa, T., E-mail: t_furu@nirs.go.jp [National Institute of Radiological Sciences, Chiba (Japan); Inaniwa, T., E-mail: taku@nirs.go.jp [National Institute of Radiological Sciences, Chiba (Japan); Sato, S., E-mail: shin_s@nirs.go.jp [National Institute of Radiological Sciences, Chiba (Japan); Himukai, T., E-mail: himukai@nirs.go.jp [National Institute of Radiological Sciences, Chiba (Japan); Shirai, T., E-mail: t_shirai@nirs.go.jp [National Institute of Radiological Sciences, Chiba (Japan); Noda, K., E-mail: noda_k@nirs.go.jp [National Institute of Radiological Sciences, Chiba (Japan)

    2011-12-15

    A fluorescent screen + a charge coupled device (CCD) system were developed to verify the performance of scanned ion beams at the HIMAC. The fluorescent light from the screen is observed by the CCD camera. Two-dimensional fields, produced by the scanning process, i.e., the position and the size of the beam for each scan, represent of the important issues in scanning irradiation. In the developed system, the two-dimensional relative fluence and the flatness of the irradiation field were measured in a straightforward technique from the luminance distribution on the screen. The position and the size of the beams were obtained from centroid computation results of the brightness. By the good sensitivity and spatial resolution of the fluorescent screen + CCD system, the scanned ion beams were verified as the measurements at the HIMAC prototype scanning system.

  2. A fluorescent screen + CCD system for quality assurance of therapeutic scanned ion beams

    Science.gov (United States)

    Takeshita, E.; Furukawa, T.; Inaniwa, T.; Sato, S.; Himukai, T.; Shirai, T.; Noda, K.

    2011-12-01

    A fluorescent screen + a charge coupled device (CCD) system were developed to verify the performance of scanned ion beams at the HIMAC. The fluorescent light from the screen is observed by the CCD camera. Two-dimensional fields, produced by the scanning process, i.e., the position and the size of the beam for each scan, represent of the important issues in scanning irradiation. In the developed system, the two-dimensional relative fluence and the flatness of the irradiation field were measured in a straightforward technique from the luminance distribution on the screen. The position and the size of the beams were obtained from centroid computation results of the brightness. By the good sensitivity and spatial resolution of the fluorescent screen + CCD system, the scanned ion beams were verified as the measurements at the HIMAC prototype scanning system.

  3. Edge plasma diagnostics in the compact helical system (CHS) device using fast neutral lithium beam

    International Nuclear Information System (INIS)

    Ueda, Mario.

    1992-05-01

    This paper reports the research activities of the author on using fast neutral lithium beam edge plasma diagnostic, at the Japanese National Institute for Fusion Science compact helical system (CHS). (author). 20 figs

  4. Effect of X-ray suppression system upon parameters of electrostatic accelerator ion beam

    Directory of Open Access Journals (Sweden)

    I. G. Ignat'ev

    2014-12-01

    Full Text Available Experimental study results are presented for a beam profile and emittance of an electrostatic accelerator “Sokol” before and after being equipped with magnet X-ray suppression system.

  5. Development of a raster electronics system for expanding the APT proton beam

    Energy Technology Data Exchange (ETDEWEB)

    Chapelle, S.; Hubbard, E.L.; Smith, T.L. [General Atomics, San Diego, CA (United States); Schulze, M.E.; Shafer, R.E. [General Atomics, Los Alamos, NM (United States)

    1998-12-31

    A 1700 MeV, 100 mA proton linear accelerator is being designed for Accelerator Production of Tritium (APT). A beam expansion system is required to uniformly irradiate a 19 x 190 cm tritium production target. This paper describes a beam expansion system consisting of eight ferrite dipole magnets to raster the beam in the x- and y-planes and also describes the salient features of the design of the electronics that are unique to the expander. Eight Insulated Gate Bipolar Transistor (IGBT)-based modulators drive the raster magnets with triangular current waveforms that are synchronized using phase-locked loops (PLLs) and voltage controlled crystal oscillators (VCXOs). Fault detection circuitry shuts down the beam before the target can be damaged by a failure of the raster system. Test data are presented for the prototype system.

  6. An Ion Beam Tracking System based on a Parallel Plate Avalanche Counter

    Directory of Open Access Journals (Sweden)

    Carter I. P.

    2013-12-01

    Full Text Available A pair of twin position-sensitive parallel plate avalanche counters have been developed at the Australian National University as a tracking system to aid in the further rejection of unwanted beam particles from a 6.5 T super conducting solenoid separator named SOLEROO. Their function is to track and identify each beam particle passing through the detectors on an event-by-event basis. In-beam studies have been completed and the detectors are in successful operation, demonstrating the tracking capability. A high efficiency 512-pixelwide-angle silicon detector array will then be integrated with the tracking system for nuclear reactions studies of radioactive ions.

  7. Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Eckard, R.D.; Van Ness, H.W.

    1979-01-01

    A fixed-price procurement contract for $24.9 million was awarded to Aydin Energy Division, Palo Alto, CA, for the design, manufacture, installation, and acceptance testing of the sustaining neutral beam power supply system (SNBPSS). This system is scheduled for completion in early 1981 and will provide the conditioned power for the 24 neutral beam source modules. Each of the 24 power supply sets will provide the accel potential of 80 kV at 88 A, the arc power, the filament power, and the suppressor power for its associated neutral beam source module

  8. A new cone beam computerized tomography system for use in endodontic surgery.

    Science.gov (United States)

    Tsurumachi, T; Honda, K

    2007-03-01

    To present a newly developed cone beam computerized tomography system (3DX Micro-CT) and its application in endodontic surgery. Cone beam CT has attracted considerable attention as a new diagnostic imaging technique in dentistry. The assessment of fractured endodontic instruments and the planning of endodontic surgery present challenges that conventional radiography cannot meet successfully. In this report, the value of the 3DX cone beam computerized radiography system is illustrated by the case of a fractured endodontic instrument protruding into the maxillary sinus.

  9. OPERATIONAL EXPERIENCE WITH BEAM ABORT SYSTEM FOR SUPERCONDUCTING UNDULATOR QUENCH MITIGATION*

    Energy Technology Data Exchange (ETDEWEB)

    Harkay, Katherine C.; Dooling, Jeffrey C.; Sajaev, Vadim; Wang, Ju

    2017-06-25

    A beam abort system has been implemented in the Advanced Photon Source storage ring. The abort system works in tandem with the existing machine protection system (MPS), and its purpose is to control the beam loss location and, thereby, minimize beam loss-induced quenches at the two superconducting undulators (SCUs). The abort system consists of a dedicated horizontal kicker designed to kick out all the bunches in a few turns after being triggered by MPS. The abort system concept was developed on the basis of single- and multi-particle tracking simulations using elegant and bench measurements of the kicker pulse. Performance of the abort system—kick amplitudes and loss distributions of all bunches—was analyzed using beam position monitor (BPM) turn histories, and agrees reasonably well with the model. Beam loss locations indicated by the BPMs are consistent with the fast fiber-optic beam loss monitor (BLM) diagnostics described elsewhere [1,2]. Operational experience with the abort system, various issues that were encountered, limitations of the system, and quench statistics are described.

  10. Expected damage to accelerator equipment due to the impact of the full LHC beam: beam instrumentation, experiments and simulations

    CERN Document Server

    Burkart, Florian

    The Large Hadron Collider (LHC) is the biggest and most powerful particle accelerator in the world, designed to collide two proton beams with particle momentum of 7 TeV/c each. The stored energy of 362MJ in each beam is sufficient to melt 500 kg of copper or to evaporate about 300 liter of water. An accidental release of even a small fraction of the beam energy can cause severe damage to accelerator equipment. Reliable machine protection systems are necessary to safely operate the accelerator complex. To design a machine protection system, it is essential to know the damage potential of the stored beam and the consequences in case of a failure. One (catastrophic) failure would be, if the entire beam is lost in the aperture due to a problem with the beam dumping system. This thesis presents the simulation studies, results of a benchmarking experiment, and detailed target investigation, for this failure case. In the experiment, solid copper cylinders were irradiated with the 440GeV proton beam delivered by the ...

  11. LIPAc personnel protection system for realizing radiation licensing conditions on injector commissioning with deuteron beam

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Hiroki, E-mail: takahashi.hiroki@jaea.go.jp [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Narita, Takahiro; Kasugai, Atsushi [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Kojima, Toshiyuki [Gitec Co. Ltd., Hachinohe, Aomori (Japan); Marqueta, Alvaro; Nishiyama, Koichi [IFMIF/EVEDA Project Team, Rokkasho, Aomori (Japan); Sakaki, Hironao [Quantum Beam Science Center, JAEA, Kizu, Kyoto (Japan); Gobin, Raphael [Commissariat à l’Energie Atomique et aux Energies Alternatives, CEA/Saclay, DSM/IRFU, Gif/Yvette (France)

    2016-11-01

    Highlights: • Personnel Protection System (PPS) is developed to adapt the radiation licensing. • PPS achieves the target performance to secure the personnel safety. • Pulse Duty Management System (PDMS) is developed to manage the beam-operation-time. • Satisfying performance of PDMS is confirmed by injector operation with H+ beam. • By the result of PPS and PDMS tests, the radiation license was successfully obtained. - Abstract: The performance validation of the Linear IFMIF Prototype Accelerator (LIPAc), up to the energy of 9 MeV deuteron beam with 125 mA continuous wave (CW), is planned in Rokkasho, Japan. There are three main phases of LIPAc performance validation: Injector commissioning, RFQ commissioning and LIPAc commissioning. Injector commissioning was started by H{sup +} and D{sup +} beam. To apply the radiation licensing for the Injector commissioning, the entering/leaving to/from accelerator vault should be under control, and access to the accelerator vault has to be prohibited for any person during the beam operation. The Personnel Protection System (PPS) was developed to adapt the radiation licensing conditions. The licensing requests that PPS must manage the accumulated D{sup +} current. So, to manage the overall D{sup +} beam time during injector operation, Pulse Duty Management System (PDMS) was developed as a configurable subsystem as part of the PPS. The PDMS was tested during H{sup +} beam (as simulated D{sup +}) operation, to confirm that it can handle the beam inhibit from Injector before the beam accumulation is above the threshold value specified in the radiation licensing condition. In this paper, the design and configuration of these systems and the result of the tests are presented.

  12. Method for energy recovery of spent ERL beams

    Energy Technology Data Exchange (ETDEWEB)

    Marhauser, Frank; Hannon, Fay; Rimmer, Robert; Whitney, R. Roy

    2018-01-16

    A method for recovering energy from spent energy recovered linac (ERL) beams. The method includes adding a plurality of passive decelerating cavities at the beam dump of the ERL, adding one or more coupling waveguides between the passive decelerating cavities, setting an adequate external Q (Qext) to adjust to the beam loading situation, and extracting the RF energy through the coupling waveguides.

  13. System and method for dose verification and gamma ray imaging in ion beam therapy

    Energy Technology Data Exchange (ETDEWEB)

    Mihailescu, Lucian

    2017-12-26

    This disclosure provides systems, methods, and apparatus related to ion beam therapy. In one aspect, a system includes a position sensitive detector and a collimator. The position sensitive detector configured to detect gamma rays generated by an ion beam interacting with a target. The collimator is positioned between the target and the position sensitive detector. The collimator includes a plurality of knife-edge slits, with a first knife-edge slit intersecting with a second knife-edge slit.

  14. A control and data acquisition system for use in relativistic neutral hydrogen beam studies

    International Nuclear Information System (INIS)

    Anderson, J.R.; Durocher, J.J.G.; Smith, G.R.; James, D.R.

    1987-01-01

    An experimental facility consisting of both hardware and software has been assembled for use in studies with 10 to 50 MeV H 0 beams. With a CAMAC/MBD hardware base, the system controls an optical monochrometer, monitors the H 0 beam, logs data and does preliminary analysis of the results. The system has been successfully adapted to use in other experiments requiring similar monitor and control functions

  15. High resolution acoustic measurement system and beam pattern reconstruction method for bat echolocation emissions.

    Science.gov (United States)

    Gaudette, Jason E; Kloepper, Laura N; Warnecke, Michaela; Simmons, James A

    2014-01-01

    Measurements of the transmit beam patterns emitted by echolocating bats have previously been limited to cross-sectional planes or averaged over multiple signals using sparse microphone arrays. To date, no high-resolution measurements of individual bat transmit beams have been reported in the literature. Recent studies indicate that bats may change the time-frequency structure of their calls depending on the task, and suggest that their beam patterns are more dynamic than previously thought. To investigate beam pattern dynamics in a variety of bat species, a high-density reconfigurable microphone array was designed and constructed using low-cost ultrasonic microphones and custom electronic circuitry. The planar array is 1.83 m wide by 1.42 m tall with microphones positioned on a 2.54 cm square grid. The system can capture up to 228 channels simultaneously at a 500 kHz sampling rate. Beam patterns are reconstructed in azimuth, elevation, and frequency for visualization and further analysis. Validation of the array measurement system and post-processing functions is shown by reconstructing the beam pattern of a transducer with a fixed circular aperture and comparing the result with a theoretical model. To demonstrate the system in use, transmit beam patterns of the big brown bat, Eptesicus fuscus, are shown.

  16. FE Modelling of the Seismic Behavior of Wide Beam-Column Joints Strengthened with CFRP Systems

    Directory of Open Access Journals (Sweden)

    Giuseppe Santarsiero

    2018-02-01

    Full Text Available A large share of reinforced concrete (RC framed buildings is provided with wide beams being a type of beam allowing greater freedom in the architectural arrangement of interiors, beyond further advantage due to fewer formworks needed during the construction. Nevertheless, little attention has been devoted to the seismic vulnerability of this kind of framed RC buildings as well as to the study of strengthening systems purposely developed for wide beams and wide beam-column connections. Under these premises, this paper proposes simple strengthening solutions made by Fibre Reinforced Polymers (FRP systems able to effectively improve seismic capacity through feasible arrangement suitable in case a wide beam is present. On the basis of wide beam-column joints previously tested without strengthening system, detailed nonlinear finite element models were calibrated. Then, an FRP strengthening intervention based on a brand new arrangement was modeled in order to perform additional simulations under seismic actions. This way, the effectiveness of the strengthening intervention was assessed finding out that significant strength and ductility increments were achieved with a relatively simple and cheap strengthening arrangement. Additional research would be desirable in the form of experimental tests on the simulated wide beam-column joints.

  17. Industrial fiber beam delivery system for ultrafast lasers: applications and recent advances

    Science.gov (United States)

    Eilzer, Sebastian; Funck, Max C.; Wedel, Björn

    2016-03-01

    Fiber based laser beam delivery is the method of choice for high power laser applications whenever great flexibility is required. For cw-lasers fiber beam delivery has long been established but has recently also become available for ultrafast lasers. Using micro-structured hollow core fibers that guide the laser beam mostly inside a hollow core, nonlinear effects and catastrophic damage that arise in conventional glass fibers can be avoided. Today, ultrafast pulses with several 100 μJ and hundreds of MW can be transmitted in quasi single mode fashion. In addition, the technology opens new possibilities for beam delivery systems as the pulse propagation inside the fiber can be altered on purpose. For example to shorten the pulse duration of picosecond lasers down into the femtosecond regime. We present a modular fiber beam delivery system for micromachining applications with industrial pico- and femtosecond lasers that is flexibly integrated into existing applications. Micro-structured hollow core fibers inside the sealed laser light cable efficiently guide high-power laser pulses over distances of several meters with excellent beam quality, while power, pulse duration and polarization are maintained. Robust and stable beam transport during dynamic operation as in robot or gantry systems will be discussed together with optional pulse compression.

  18. Combined hydrogen and lithium beam emission spectroscopy observation system for Korea Superconducting Tokamak Advanced Research

    Energy Technology Data Exchange (ETDEWEB)

    Lampert, M. [Wigner RCP, Euratom Association-HAS, Budapest (Hungary); BME NTI, Budapest (Hungary); Anda, G.; Réfy, D.; Zoletnik, S. [Wigner RCP, Euratom Association-HAS, Budapest (Hungary); Czopf, A.; Erdei, G. [Department of Atomic Physics, BME IOP, Budapest (Hungary); Guszejnov, D.; Kovácsik, Á.; Pokol, G. I. [BME NTI, Budapest (Hungary); Nam, Y. U. [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2015-07-15

    A novel beam emission spectroscopy observation system was designed, built, and installed onto the Korea Superconducting Tokamak Advanced Research tokamak. The system is designed in a way to be capable of measuring beam emission either from a heating deuterium or from a diagnostic lithium beam. The two beams have somewhat complementary capabilities: edge density profile and turbulence measurement with the lithium beam and two dimensional turbulence measurement with the heating beam. Two detectors can be used in parallel: a CMOS camera provides overview of the scene and lithium beam light intensity distribution at maximum few hundred Hz frame rate, while a 4 × 16 pixel avalanche photo-diode (APD) camera gives 500 kHz bandwidth data from a 4 cm × 16 cm region. The optics use direct imaging through lenses and mirrors from the observation window to the detectors, thus avoid the use of costly and inflexible fiber guides. Remotely controlled mechanisms allow adjustment of the APD camera’s measurement location on a shot-to-shot basis, while temperature stabilized filter holders provide selection of either the Doppler shifted deuterium alpha or lithium resonance line. The capabilities of the system are illustrated by measurements of basic plasma turbulence properties.

  19. Dual ion beam irradiation system for in situ observation with electron microscope

    International Nuclear Information System (INIS)

    Tsukamoto, Tetuo; Hojou, Kiiti; Furuno, Sigemi; Otsu, Hitosi; Izui, Kazuhiko.

    1993-01-01

    We have developed a new in situ observation system for dynamic processes under dual ion beam irradiation. The system consists of a modified 400 keV analytical electron microscope (JEOL, JEM-4000FX) and two 40 kV ion beam accelerators. This system allows evaluation of microscopic changes of structure and chemical bonding state of materials in the dynamic processes under two kinds of ion beam irradiations, that is required for the simulation test of the first wall of nuclear fusion reactors onto which He + , H + , and H 2 + ions are irradiated simultaneously. These two ion accelerators were equipped symmetrically both sides of the electron microscope and individually controlled. Each ion beam extracted from a duo-plasmatron ion gun is bent downward by an angle of 30deg with a mass-separating magnet, and introduced into specimen chamber of the electron microscope. Inside the specimen chamber the beam is deflected again by an angle of 30deg with an electrostatic prism so as to be incident on the specimen surface. Finally, two ion beams from both side are incident on the specimen surface at an angle of 60deg. The maximum ion current density of helium is more than 250μA/cm 2 at the specimen at an ion energy of 17 keV. Images of the electron microscope during dual ion beam irradiation are observed through a TV camera and recorded with a VTR. (author)

  20. Java Expert GUI framework for CERN beam instrumentation systems

    CERN Document Server

    Bart Pedersen, S; Jackson, S

    2011-01-01

    The CERN Beam Instrumentation Group’s software section has recently performed a study of the tools used to produce Java expert GUI applications. This paper will present the analysis that was made to understand the requirements for generic components and the resulting tools including a collection of Java components that have been made available for a wider audience. The paper will also discuss the prospect of using Maven as the deployment tool with its implications for developers and users.