WorldWideScience

Sample records for beam dump system

  1. High intensity beam dump for the Tevatron beam abort system

    International Nuclear Information System (INIS)

    Kidd, J.; Mokhov, N.; Murphy, T.; Palmer, M.; Toohig, T.; Turkot, F.; VanGinneken, A.

    1981-01-01

    The beam abort system proposed for the Fermilab Tevatron Accelerator will extract the proton beam from the ring in a single turn (approximately 20/mu/s) and direct it to an external beam dump. It is the function of the beam dump to absorb the unwanted beam and limit the escaping radiation to levels that are acceptable to the surrounding populace and apparatus. A beam dump that is expected to meet these requirements has been designed and constructed. Detailed design of the dump, including considerations leading to the choice of materials, are given. 6 refs

  2. LHC beam dumping system Extraction channel layout and acceptance

    CERN Document Server

    Goddard, B; Uythoven, J; Veness, R; Weterings, W

    2003-01-01

    The LHC beam dumping system must safely abort the LHC beams under all conditions, including those resulting from abnormal behaviour of machine elements or subsystems of the beam dumping system itself. The extraction channels must provide sufficient aperture both for the circulating and extracted beams, over the whole energy range and under various beam parameters. These requirements impose tight constraints on the tolerances of various extraction channel components, and also on the allowed range of beam positions in the region of these components. Operation of the beam dumping system under various fault states has been considered, and the resulting apertures calculated. After describing briefly the beam dumping system and the extraction channel geometry, the various assumptions made in the analysis are presented, before deriving tolerance limits for the relevant equipment and beam parameters.

  3. LHC beam dump system Consequences of abnormal operation

    CERN Document Server

    Kramer, T; Uythoven, J

    2010-01-01

    The LHC beam dump system is one of the most critical systems concerning machine protection and safe operation. It is used to dispose of high intensity beams between 450 GeV and 7 TeV. Studies into the consequences of abnormal beam dump actions have been performed. Different error scenarios have been evaluated using particle tracking in MAD-X, including an asynchronous dump action, and the impact of different orbit and collimator settings. Losses at locations in the ring and the beam dump transfer lines have been quantified as a function of different settings of the dump system protection elements. The implications for the setting up and operation of these protection elements are discussed.

  4. Chevron beam dump for ITER edge Thomson scattering system

    International Nuclear Information System (INIS)

    Yatsuka, E.; Hatae, T.; Bassan, M.; Itami, K.; Vayakis, G.

    2013-01-01

    This paper contains the design of the beam dump for the ITER edge Thomson scattering system and mainly concerns its lifetime under the harsh thermal and electromagnetic loads as well as tight space allocation. The lifetime was estimated from the multi-pulse laser-induced damage threshold. In order to extend its lifetime, the structure of the beam dump was optimized. A number of bent sheets aligned parallel in the beam dump form a shape called a chevron which enables it to avoid the concentration of the incident laser pulse energy. The chevron beam dump is expected to withstand thermal loads due to nuclear heating, radiation from the plasma, and numerous incident laser pulses throughout the entire ITER project with a reasonable margin for the peak factor of the beam profile. Structural analysis was also carried out in case of electromagnetic loads during a disruption. Moreover, detailed issues for more accurate assessments of the beam dump's lifetime are clarified. Variation of the bi-directional reflection distribution function (BRDF) due to erosion by or contamination of neutral particles derived from the plasma is one of the most critical issues that needs to be resolved. In this paper, the BRDF was assumed, and the total amount of stray light and the absorbed laser energy profile on the beam dump were evaluated

  5. Chevron beam dump for ITER edge Thomson scattering system

    Energy Technology Data Exchange (ETDEWEB)

    Yatsuka, E.; Hatae, T.; Bassan, M.; Itami, K. [Japan Atomic Energy Agency, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan); Vayakis, G. [ITER Organization, 13115 St Paul Lez Durance Cedex (France)

    2013-10-15

    This paper contains the design of the beam dump for the ITER edge Thomson scattering system and mainly concerns its lifetime under the harsh thermal and electromagnetic loads as well as tight space allocation. The lifetime was estimated from the multi-pulse laser-induced damage threshold. In order to extend its lifetime, the structure of the beam dump was optimized. A number of bent sheets aligned parallel in the beam dump form a shape called a chevron which enables it to avoid the concentration of the incident laser pulse energy. The chevron beam dump is expected to withstand thermal loads due to nuclear heating, radiation from the plasma, and numerous incident laser pulses throughout the entire ITER project with a reasonable margin for the peak factor of the beam profile. Structural analysis was also carried out in case of electromagnetic loads during a disruption. Moreover, detailed issues for more accurate assessments of the beam dump's lifetime are clarified. Variation of the bi-directional reflection distribution function (BRDF) due to erosion by or contamination of neutral particles derived from the plasma is one of the most critical issues that needs to be resolved. In this paper, the BRDF was assumed, and the total amount of stray light and the absorbed laser energy profile on the beam dump were evaluated.

  6. Chevron beam dump for ITER edge Thomson scattering system.

    Science.gov (United States)

    Yatsuka, E; Hatae, T; Vayakis, G; Bassan, M; Itami, K

    2013-10-01

    This paper contains the design of the beam dump for the ITER edge Thomson scattering system and mainly concerns its lifetime under the harsh thermal and electromagnetic loads as well as tight space allocation. The lifetime was estimated from the multi-pulse laser-induced damage threshold. In order to extend its lifetime, the structure of the beam dump was optimized. A number of bent sheets aligned parallel in the beam dump form a shape called a chevron which enables it to avoid the concentration of the incident laser pulse energy. The chevron beam dump is expected to withstand thermal loads due to nuclear heating, radiation from the plasma, and numerous incident laser pulses throughout the entire ITER project with a reasonable margin for the peak factor of the beam profile. Structural analysis was also carried out in case of electromagnetic loads during a disruption. Moreover, detailed issues for more accurate assessments of the beam dump's lifetime are clarified. Variation of the bi-directional reflection distribution function (BRDF) due to erosion by or contamination of neutral particles derived from the plasma is one of the most critical issues that needs to be resolved. In this paper, the BRDF was assumed, and the total amount of stray light and the absorbed laser energy profile on the beam dump were evaluated.

  7. Initial results from beam commissioning of the LHC beam dump system

    CERN Document Server

    Goddard, B; Carlier, E; Ducimetière, L; Gallet, E; Gyr, M; Jensen, L; Jones, R; Kain, V; Kramer, T; Lamont, M; Meddahi, M; Mertens, V; Risselada, Thys; Uythoven, J; Wenninger, J; Weterings, W

    2010-01-01

    Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of the extraction channels and kicker performance derived from dilution sweep shapes are presented. The performance of the other equipment subsystems is summarised, in particular that of the dedicated dump system beam instrumentation.

  8. Performance with lead ions of the LHC beam dump system

    CERN Document Server

    Bruce, R; Jensen, L; Lefèvre, T; Weterings, W

    2007-01-01

    The LHC beam dump system must function safely with 208Pb82+ions. The differences with respect to the LHC proton beams are briefly recalled, and the possible areas for performance concerns discussed, in particular the various beam intercepting devices and the beam instrumentation. Energy deposition simulation results for the most critical elements are presented, and the conclusions drawn for the lead ion operation. The expected performance of the beam instrumentation systems are reviewed in the context of the damage potential of the ion beam and the required functionality of the various safety and post-operational analysis requirements.

  9. Premature beam dumps in 2011

    CERN Document Server

    Albert, Markus

    2012-01-01

    The statistical analysis of all non-programmed beam dumps during the 2011 proton run is presented. The selection criteria of fills that got considered were that the beam intensity of each of the two beams exceeded at least 1e12 particles per beam in order to exclude all probe beam dumps and most of the MPS test dumps. A distribution of beam dump causes by system is shown, as well as the time it took to re-establish injection after a non-programmed dump for fills which made it into STABLE BEAMS. This was done in an attempt to evaluate the cost of those non-programmed dumps in terms of time.

  10. Radiation monitoring and beam dump system of the OPAL silicon microvertex detector

    CERN Document Server

    Braibant, S

    1997-01-01

    The OPAL microvertex silicon detector radiation monitoring and beam dump system is described. This system was designed and implemented in order to measure the radiation dose received at every beam crossing and to induce a fast beam dump if the radiation dose exceeds a given threshold.

  11. The beam dump tunnels

    CERN Multimedia

    Patrice Loïez

    2002-01-01

    In these images workers are digging the tunnels that will be used to dump the counter-circulating beams. Travelling just a fraction under the speed of light, the beams at the LHC will each carry the energy of an aircraft carrier travelling at 12 knots. In order to dispose of these beams safely, a beam dump is used to extract the beam and diffuse it before it collides with a radiation shielded graphite target.

  12. Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System

    CERN Document Server

    Vatansever, Volkan

    The nominal stored energy in each LHC beam is 360 MJ, surpassing the beam energy of other accelerators by orders of magnitude. This energy threatens to damage accelerator components in case of uncontrolled beam losses To avoid damage of accelerator equipment due to impacting beam, the controlled removal of the LHC beams from the collider rings towards the dump block must be guaranteed at all times. Therefore, the LHC Beam Dumping System was built according to high reliability standards. To further reduce the risk of incapability to dump the beams in case of correlated failures in the redundant system, a new direct link from the LHC Beam Interlock System to the Re-triggering Lines of the LHC Beam Dumping System will be implemented for the startup with beam in 2015. This link represents a diverse redundancy to the current implementation, which should neither significantly increase the risk for so-called Asynchronous Beam Dumps nor compromise machine availability. Therefore, a reliability analysis down to the co...

  13. Dependability analysis of a safety critical system the LHC beam dumping system at CERN

    CERN Document Server

    Filippini, R

    2006-01-01

    This thesis presents the dependability study of the Beam Dumping System of the Large Hadron Collider (LHC), the high energy particle accelerator to be commissioned at CERN in summer 2007. There are two identical, independent LHC Beam Dumping Systems (LBDS), one per LHC beam, each consisting of a series of magnets that extract the particle beam from the LHC ring into the extraction line leading to the absorbing block. The consequences of a failure within the LBDS can be very severe. This risk is reduced by applying redundancy to the design of the most critical components and on-line surveillance that, in case of a detected failure, issues a safe operation abort, called false beam dump. The system has been studied applying Failure Modes Effects and Criticality Analysis (FMECA) and reliability prediction. The system failure processes have been represented with a state transition diagram, governed by a Markov regenerative stochastic process, and analysed for different operational scenarios for one year of operati...

  14. Upgrade of the Super Proton Synchrotron Vertical Beam Dump System

    CERN Document Server

    Senaj, V; Vossenberg, E

    2010-01-01

    The vertical beam dump system of the CERN Super Proton Synchrotron (SPS) uses two matched magnets with an impedance of 2 W and a combined kick strength of 1.152 Tm at 60 kV supply voltage. For historical reasons the two magnets are powered from three 3 W pulse forming networks (PFN) through three thyratronignitron switches. Recently flashovers were observed at the entry of one of the magnets, which lead, because of the electrical coupling between the kickers, to a simultaneous breakdown of the pulse in both magnets. To improve the reliability an upgrade of the system was started. In a first step the radii of surfaces at the entry of the weak magnet were increased, and the PFN voltage was reduced by 4%; the kick strength could be preserved by reducing the magnet termination resistance by 10 %. The PFNs were protected against negative voltage reflections and their last cell was optimised. In a second step the two magnets will be electrically separated and powered individually by new 2 W PFNs with semiconductor ...

  15. External post-operational checks for the LHC beam dumping system

    International Nuclear Information System (INIS)

    Magnin, N.; Baggiolini, V.; Carlier, E.; Goddard, B.; Gorbonosov, R.; Khasbulatov, D.; Uythoven, J.; Zerlauth, M.

    2012-01-01

    The LHC Beam Dumping System (LBDS) is a critical part of the LHC machine protection system. After every LHC beam dump action the various signals and transient data recordings of the beam dumping control systems and beam instrumentation measurements are automatically analysed by the external Post-Operational Checks (XPOC) system to verify the correct execution of the dump action and the integrity of the related equipment. This software system complements the LHC machine protection hardware, and has to ascertain that the beam dumping system is 'as good as new' before the start of the next operational cycle. This is the only way by which the stringent reliability requirements can be met. The XPOC system has been developed within the framework of the LHC 'Post-Mortem' system, allowing highly dependable data acquisition, data archiving, live analysis of acquired data and replay of previously recorded events. It is composed of various analysis modules, each one dedicated to the analysis of measurements coming from specific equipment. This paper describes the global architecture of the XPOC system and gives examples of the analyses performed by some of the most important analysis modules. It explains the integration of the XPOC into the LHC control infrastructure along with its integration into the decision chain to allow proceeding with beam operation. Finally, it discusses the operational experience with the XPOC system acquired during the first years of LHC operation, and illustrates examples of internal system faults or abnormal beam dump executions which it has detected. (authors)

  16. Changes to the LHC Beam Dumping System for LHC Run 2

    CERN Document Server

    Uythoven, Jan; Borburgh, Jan; Carlier, Etienne; Gabourin, Stéphane; Goddard, Brennan; Magnin, Nicolas; Senaj, Viliam; Voumard, Nicolas; Weterings, Wim

    2014-01-01

    The LHC beam dumping system performed according to expectations during Run 1 of the LHC (2009 – 2013). A brief overview of the experience is given, including a summary of the observed performance by comparison to expectations. An important number of changes are applied to the beam dumping system during the present Long Shutdown in order to further improve its safety and performance. They include the addition of a direct link between the Beam Interlock System and the re-triggering system of the dump kickers, the modification of the uninterrupted electrical power distribution architecture, the upgrade of the HV generators, the consolidation of the trigger synchronisation system, the modifications to the triggering system of the power switches and the changes to the dump absorbers TCDQ.

  17. LHC beam dump system : analysis of beam commissioning, performance and the consequences of abnormal operation

    International Nuclear Information System (INIS)

    Kramer, T.

    2011-01-01

    The LHC accelerates proton beams to a momentum of up to 7 TeV/c. At this energy level and with nominal beam intensity the stored energy of 360 MJ per beam is sufficient to melt 500 kg of copper. In addition up to 10 GJ are stored within the LHC magnet system at top energy. lt is obvious that such a machine needs well designed safety and protection systems. The LHC Beam Dump System (LBDS) is such a system and one of the most critical once concerning machine protection and safe operation. lt is used to dispose of high intensity beams between 450 GeV and 7 TeV and is thus designed to fast extract beam in a loss free way and to transfer it to an external absorber. For each ring systems of 15 horizontal fast kicker magnets (MKD), 15 vertically deflecting magnetic septa (MSD) and 10 diluter kicker magnets (MKB) are installed. This thesis is concerned with the analysis of the LBDS performance under normal operating parameters as well as under abnormal conditions like in the event of asynchronous beam abort or missing MKD elements. Therefore a sophisticated simulation environment was developed based on the use of the MAD-X tracking code. A system of tracking jobs was set up to study failure cases and losses for various dump events. Those jobs can be distributed to available CPU power and be calculated in parallel. Studies into the consequences of abnormal beam dump actions have been performed. Different error scenarios have been evaluated including an asynchronous dump action, prefire cases, and the impact of different orbit and collimator settings. Losses at locations in the ring and the beam dump transfer lines have been quantified as a function of different settings of the dump system protection elements. The implications for the setup and operation of these protection elements are discussed. Particle distributions can be created according to the used orbit. Simulations with different orbit parameters (including magnet field errors, beam position read out errors

  18. Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets

    CERN Document Server

    Uythoven, J; Ducimetière, L; Goddard, B; Gräwer, G; Olivieri, F; Pereira, L; Vossenberg, Eugène B

    2006-01-01

    The LHC beam dumping system must protect the LHC machine from damage by reliably and safely extracting and absorbing the circulating beams when requested. Two sets of 15 extraction kicker magnets form the main active part of this system. They have been produced, tested and calibrated by measuring the integrated magnetic field and the magnet current at different beam energies. The calibration data have been analysed, and the critical parameters are compared with the specifications. Implications for the configuration, control and operation of the beam dumping system are discussed.

  19. LHC Beam Dump System: Analysis of beam commissioning, performance and the consequences of abnormal operation

    CERN Document Server

    Kramer, Thomas

    2011-01-01

    The LHC accelerates proton beams to a momentum of up to 7 TeV/c. At this energy level and with nominal beam intensity the stored energy of 360 MJ per beam is sufficient to melt 500 kg of copper. In addition up to 10 GJ are stored within the LHC magnet system at top energy. It is obvious that such a machine needs well designed safety and protection systems. The LHC Beam Dump System (LBDS) is such a system and one of the most critical once concerning machine protection and safe operation. It is used to dispose of high intensity beams between 450 GeV and 7 TeV and is thus designed to fast extract beam in a loss free way and to transfer it to an external absorber. For each ring systems of 15 horizontal fast kicker magnets (MKD), 15 vertically deflecting magnetic septa (MSD) and 10 diluter kicker magnets (MKB) are installed. This thesis is concerned with the analysis of the LBDS performance under normal operating parameters as well as under abnormal conditions like in the event of asynchronous beam abort or missin...

  20. Safety Analysis of the Movable Absorber TCDQ in the LHC Beam Dumping System

    CERN Document Server

    Filippini, R

    2009-01-01

    The LHC Beam Dumping System nominally dumps the beam synchronously with the passage of the particle free beam abort gap at the beam dump extraction kickers. In the case of an asynchronous beam dump the TCDQ absorber protects the machine aperture. It is a single sided collimator, positioned close to the beam and it has to follow the beam position and beam size during the energy ramp. This report assesses the different failure scenarios of TCDQ positioning and their likelihood. The failure probability for the two TCDQ systems together is estimated to be 3.6 E-05 (mean value) for one year of LHC operation. This corresponds to a SIL4 safety level, which is considered sufficient. The three dominant failure modes are highlighted. The calculated failure probability refers to scenarios that are generated and developed inside the TCDQ system. Potential failure sources not included are the interaction with external systems: the transmission of the start signal to the PLC from a dedicated timing card and the manual opti...

  1. The control system for the LEP beam dump

    International Nuclear Information System (INIS)

    Carlier, E.; Aimar, A.; Bretin, J.L.; Marchand, A.; Mertens, V.; Verhagen, H.

    1994-01-01

    A beam abort system has been developed and installed in LEP to allow the controlled disposal of the stored beam energy. In view of the importance of the system for the protection of the experiments and the machine, and the technical problems in a pulsed high-power environment, special care has been taken to arrive at a clean functional separation between the different elements of the control electronics, using optical transmission of information. All interlocks have been implemented in hardware. The slow controls and the monitoring tasks have been realized in the framework of a modular software tool kit. ((orig.))

  2. Implementation of a Direct Link between the LHC Beam Interlock System and the LHC Beam Dumping System Re-Triggering Lines

    CERN Document Server

    Gabourin, S; Denz, R; Magnin, N; Uythoven, J; Wollmann, D; Zerlauth, M; Vatansever, V; Bartholdt, M; Bertsche, B; Zeiler, P

    2014-01-01

    To avoid damage of accelerator equipment due to impacting beam, the controlled removal of the LHC beams from the collider rings towards the dump blocks must be guaranteed at all times. When a beam dump is demanded, the Beam Interlock System communicates this request to the Trigger Synchronisation and Distribution System of the LHC Beam Dumping System. Both systems were built according to high reliability standards. To further reduce the risk of incapability to dump the beams in case of correlated failures in the Trigger Synchronisation and Distribution System, a new direct link from the Beam Interlock System to the re-triggering lines of the LHC Beam Dumping System will be implemented for the start-up with beam in 2015. The link represents a diverse redundancy to the current implementation, which should neither significantly increase the risk for so-called asynchronous beam dumps nor compromise machine availability. This paper describes the implementation choices of this link. Furthermore the results of a rel...

  3. Study for a failsafe trigger generation system for the Large Hadron Collider beam dump kicker magnets

    CERN Document Server

    Rampl, M

    1999-01-01

    The 27 km-particle accelerator Large Hadron Collider (LHC), which will be completed at the European Laboratory for Particle Physics (CERN) in 2005, will work with extremely high beam energies (~334 MJ per beam). Since the equipment and in particular the superconducting magnets must be protected from damage caused by these high energy beams the beam dump must be able to absorb this energy very reliable at every stage of operation. The kicker magnets that extract the particles from the accelerator are synchronised with the beam by the trigger generation system. This thesis is a first study for this electronic module and its functions. A special synchronisation circuit and a very reliable electronic switch were developed. Most functions were implemented in a Gate-Array to improve the reliability and to facilitate modifications during the test stage. This study also comprises the complete concept for the prototype of the trigger generation system. During all project stages reliability was always the main determin...

  4. The Performance of the New TCDQ System in the LHC Beam Dumping Region

    CERN Document Server

    Presland, Andrew; Weterings, Wim

    2005-01-01

    The superconducting quadrupole magnet Q4 and other downstream LHC machine elements risk destruction in the event of a beam dump that is not synchronised with the abort gap. In order to protect these elements, a single sided mobile graphite diluter block TCDQ, in combination with a two-sided secondary collimator TCS and iron shield TCDQM, will be installed in front of Q4. This protection system should also intercept spurious particles in the beam abort gap to prevent quenches from occurring during regular beam aborts, and must also intercept the particles from the secondary halo during low beam lifetime without provoking quenches. The conceptual design of the TCDQ system is briefly presented, with the load conditions and performance criteria. The FLUKA simulations are described results discussed in the context of the expected performance levels for LHC operation.

  5. Dumping the decelerated beams of CLIC

    CERN Document Server

    Jeanneret, Bernard

    2011-01-01

    The spent drive beam must be cleanly extracted and bent away from the decelerator axis at the end of each CLIC decelerator in order to leave space for injecting a fresh beam train in the next sector. Then the spent beam must be safely absorbed. A compact extraction system made of a single dipole is proposed. The spent beam is driven to a water dump located at 20m downstream of the extraction point and transversely 6m away of the axis of the main linac. An adequate spread of the beam impact map on the dump offers small temperature excursions in both the dump and its entrance window, allowing for reliable operation and a long lifetime of the system.

  6. Design studies of the LHC beam dump

    CERN Document Server

    Zazula, J M

    1997-01-01

    This paper is a compilation of the results of the recent 5 years studies of the beam dump system for the LHC proton collider at CERN, with a special emphasis on feasibility of the central absorber. Simulations of energy deposition by particle cascades, optimisation of the beam sweeping system and core layout, and thermal analysis have been completed; the structural deformation, stress and vibration analyses are well advanced, and a new concept of the shielding design has recently been approved. The material characteristics, geometry, performance parameters and safety precautions for different components of the beam dump are actually close to completion, which augurs well for the start of construction work according to schedule.

  7. Beam-dump kicker magnets

    International Nuclear Information System (INIS)

    Bulos, F.; Odian, A.; Tomlin, B.

    1983-01-01

    The beam-dump kicker magnets are located in the final focus region and, in conjunction with septum magnets, extract the beams after they have passed the interaction point (IP) and direct them to their respective dumps. Two schemes for these kickers have been under consideration; ferrite transmission line magnets utilizing technology common with damping rings and positron target kickers, and current loop magnets which are possible only for the dump kickers, where the rise time of the magnetic pulse can be comparatively longer; approximately 400 nanoseconds as compared with 50 nanoseconds for the others. A prototype ferrite kicker has been built and is undergoing tests. Since the current loop requires lower voltage and power plus some additional savings in cost, we decided to build and test a prototype. This note describes in detail an optimized design for the current loop magnets and their associated pulse circuitry

  8. Beam catcher/dump

    International Nuclear Information System (INIS)

    Makdisi, Y.; Rodger, E.; Glenn, J.W.; Brown, K.

    1985-01-01

    A simple, low cost aperture limiting device with an absorber block has been developed and installed in the AGS ring at Brookhaven National Laboratory. The device intercepts injection tails, transition losses, and the inward spiraling beam of an aborted acceleration or extraction cycle. The resultant consolidation of losses at one point reduces activation of components around the ring and radiation exposure to personnel. 3 refs., 6 figs

  9. Design of the LHC beam dump

    International Nuclear Information System (INIS)

    Ferrari, A.; Stevenson, G.R.; Weisse, E.

    1992-01-01

    The severe constraints on the beam dumping system for the proposed Large Hadron Collider (LHC) arising from the beam energy (7.7 TeV) and intensity (5x10 14 protons) call for unusual procedures to dilute the beam. Monte-Carlo cascade simulations which calculated the effectiveness of thin scatterers placed upstream of the main absorber have been corrected and updated. Results are also presented concerning the optimization of the thicknesses of such scatterers. These show that a combined sweeping plus double-scatterer system gives a reasonable safety margin. A system combining the sweeping procedure with a dump where the absorber blocks are interleaved with air gaps could produce comparable dilution of the deposited energy. (author) 6 refs.; 3 figs

  10. Challenges and Plans for Injection and Beam Dump

    Science.gov (United States)

    Barnes, M.; Goddard, B.; Mertens, V.; Uythoven, J.

    The injection and beam dumping systems of the LHC will need to be upgraded to comply with the requirements of operation with the HL-LHC beams. The elements of the injection system concerned are the fixed and movable absorbers which protect the LHC in case of an injection kicker error and the injection kickers themselves. The beam dumping system elements under study are the absorbers which protect the aperture in case of an asynchronous beam dump and the beam absorber block. The operational limits of these elements and the new developments in the context of the HL-LHC project are described.

  11. High and low energy gamma beam dump designs for the gamma beam delivery system at ELI-NP

    International Nuclear Information System (INIS)

    Yasin, Zafar; Matei, Catalin; Ur, Calin A.; Mitu, Iani-Octavian; Udup, Emil; Petcu, Cristian

    2016-01-01

    The Extreme Light Infrastructure - Nuclear Physics (ELI-NP) is under construction in Magurele, Bucharest, Romania. The facility will use two 10 PW lasers and a high intensity, narrow bandwidth gamma beam for stand-alone and combined laser-gamma experiments. The accurate estimation of particle doses and their restriction within the limits for both personel and general public is very important in the design phase of any nuclear facility. In the present work, Monte Carlo simulations are performed using FLUKA and MCNPX to design 19.4 and 4 MeV gamma beam dumps along with shielding of experimental areas. Dose rate contour plots from both FLUKA and MCNPX along with numerical values of doses in experimental area E8 of the facility are performed. The calculated doses are within the permissible limits. Furthermore, a reasonable agreement between both codes enhances our confidence in using one or both of them for future calculations in beam dump designs, radiation shielding, radioactive inventory, and other calculations releated to radiation protection. Residual dose rates and residual activity calculations are also performed for high-energy beam dump and their effect is negligible in comparison to contributions from prompt radiation.

  12. High and low energy gamma beam dump designs for the gamma beam delivery system at ELI-NP

    Energy Technology Data Exchange (ETDEWEB)

    Yasin, Zafar, E-mail: zafar.yasin@eli-np.ro; Matei, Catalin; Ur, Calin A.; Mitu, Iani-Octavian; Udup, Emil; Petcu, Cristian [Extreme Light Infrastructure - Nuclear Physics / Horia Hulubei National Institute for R& D in Physics and Nuclear Engineering, Bucharest-Magurele (Romania)

    2016-03-25

    The Extreme Light Infrastructure - Nuclear Physics (ELI-NP) is under construction in Magurele, Bucharest, Romania. The facility will use two 10 PW lasers and a high intensity, narrow bandwidth gamma beam for stand-alone and combined laser-gamma experiments. The accurate estimation of particle doses and their restriction within the limits for both personel and general public is very important in the design phase of any nuclear facility. In the present work, Monte Carlo simulations are performed using FLUKA and MCNPX to design 19.4 and 4 MeV gamma beam dumps along with shielding of experimental areas. Dose rate contour plots from both FLUKA and MCNPX along with numerical values of doses in experimental area E8 of the facility are performed. The calculated doses are within the permissible limits. Furthermore, a reasonable agreement between both codes enhances our confidence in using one or both of them for future calculations in beam dump designs, radiation shielding, radioactive inventory, and other calculations releated to radiation protection. Residual dose rates and residual activity calculations are also performed for high-energy beam dump and their effect is negligible in comparison to contributions from prompt radiation.

  13. Results from the LHC Beam Dump Reliability Run

    CERN Document Server

    Uythoven, J; Carlier, E; Castronuovo, F; Ducimetière, L; Gallet, E; Goddard, B; Magnin, N; Verhagen, H

    2008-01-01

    The LHC Beam Dumping System is one of the vital elements of the LHC Machine Protection System and has to operate reliably every time a beam dump request is made. Detailed dependability calculations have been made, resulting in expected rates for the different system failure modes. A 'reliability run' of the whole system, installed in its final configuration in the LHC, has been made to discover infant mortality problems and to compare the occurrence of the measured failure modes with their calculations.

  14. Dilution kicker for the SPS beam dump

    CERN Multimedia

    1974-01-01

    In order to reduce thermal stress on the SPS dump material, the fast-ejected beam was swept horizontally across the dump. This was done with the "dilution kicker" MKDH, still in use at the time of writing. The person on the left is Manfred Mayer. See also 7404072X.

  15. TCDQ-TCT retraction and losses during asynchronous beam dump

    CERN Document Server

    Bracco, Chiara; Quaranta, Elena; CERN. Geneva. ATS Department

    2016-01-01

    The protection provided by the TCDQs in case of asynchronous beam dump depends strongly on their correct setup. They have to respect the strict hierarchy of the full collimation system and shield the tertiary collimators in the experimental regions. This MD aimed at performing asynchronous beam dump tests with different configurations, in order to assess the minimum allowed retraction between TCTs and TCDQs and, as a consequence, on the The protection provided by the TCDQs in case of asynchronous beam dump depends strongly on their correct setup. They have to respect the strict hierarchy of the full collimation system and shield the tertiary collimators in the experimental regions. This MD aimed at performing asynchronous beam dump tests with different configurations, in order to assess the minimum allowed retraction between TCTs and TCDQs and, as a consequence, on the β* reach.

  16. SPIDER beam dump as diagnostic of the particle beam

    Energy Technology Data Exchange (ETDEWEB)

    Zaupa, M., E-mail: matteo.zaupa@igi.cnr.it; Sartori, E. [Università degli Studi di Padova, Via 8 Febbraio 2, Padova 35122 (Italy); Consorzio RFX, Corso Stati Uniti 4, Padova 35127 (Italy); Dalla Palma, M.; Brombin, M.; Pasqualotto, R. [Consorzio RFX, Corso Stati Uniti 4, Padova 35127 (Italy)

    2016-11-15

    The beam power produced by the negative ion source for the production of ion of deuterium extracted from RF plasma is mainly absorbed by the beam dump component which has been designed also for measuring the temperatures on the dumping panels for beam diagnostics. A finite element code has been developed to characterize, by thermo-hydraulic analysis, the sensitivity of the beam dump to the different beam parameters. The results prove the capability of diagnosing the beam divergence and the horizontal misalignment, while the entity of the halo fraction appears hardly detectable without considering the other foreseen diagnostics like tomography and beam emission spectroscopy.

  17. Beam dump experiments at the AGS

    International Nuclear Information System (INIS)

    Soukas, A.; Bregman, M.; Galik, R.

    1978-01-01

    Searches for the prompt production of weak or semi-strongly interacting particles in a neutrino beam dump and their subsequent interaction or decay were performed at the AGS. The experiment is detailed using the totally active liquid scintillator detector, and mention the results of the spark chamber detector. An exposure of a copper beam dump to two orders of magnitude more protons than in previous searches at 28 GeV has yielded 104 neutrino-like events in the detector. The events from the beam dump are compared directly with those from π and K decay neutrinos produced concurrently in the normal long neutrino decay path following a 15 cm brass target. The characteristics of the events are similar. However, when compared to the rate of events predicted by scaling the 15 cm target yields, the beam dump data show an excess of 45 +- 16 events. The excess events from the beam dump appear to deposit energies greater than or equal to 1 GeV. Their source remains puzzling. Future experiments at the AGS could verify the existence of the effect, decrease the uncertainty in the predicted number of events from 30 to 10% by directly measuring the pion absorption length with a variable density target, search for threshold effects, and measure the sign of the charge of the existing muons. 22 references

  18. Proposal for the award of a contract for the supply of ceramic vacuum chambers for the LHC beam dumping system

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of ceramic vacuum chambers for the LHC beam dumping system. Following a market survey carried out among 22 firms in seven Member States and one firm in the United States, a call for tenders (IT-2765/SL/LHC) was sent on 13 September 2001 to one firm. By the closing date, CERN had received a tender. The Finance Committee is invited to agree to the negotiation of a contract with KYOCERA FINECERAMICS (DE) for the supply of 36 ceramic vacuum chambers for the LHC beam dumping system for a total amount of 681 530 euros (1 013 094 Swiss francs), not subject to revision, with options for six additional vacuum chambers, for an additional amount of 146 768 euros (218 171 Swiss francs), not subject to revision, bringing the total amount to 828 298 euros (1 231 265 Swiss francs), not subject to revision. The rate of exchange which has been used is that applying on the closing date of the call for tenders. The firm has indicated the following distribution by cou...

  19. ATA diagnostic beam dump conceptual design

    International Nuclear Information System (INIS)

    1981-09-01

    A diagnostic beam dump, able to withstand 72,000 pulses (10 kA, 50 MeV/pulse) per shift was designed and analyzed. The analysis shows that the conceptual beam dump design consisting of 80 vitreous carbon plate-foam elements is able to withstand the thermal and mechanical stresses generated. X-rays produced by bremsstrahlung are absorbed by a three element copper plate-foam x-ray absorber. Cooling between bursts of electron pulses is provided by pressurized helium

  20. Design of the MI40 beam-abort dump

    International Nuclear Information System (INIS)

    Bhat, C.M.; Martin, P.S.; Russell, A.D.

    1995-05-01

    A beam-abort dump for the Fermilab Main Injector to handle 3E13 protons per pulse at 150 Gev has been designed. A 120 GeV beam line goes through the beam-dump off-set by 27cm from its center. The design and the environmental safety aspects of the beam-dump are described here

  1. Upgrade of the LHC Beam Dumping Protection Elements

    CERN Document Server

    Weterings, W; Balhan, B; Borburgh, J; Goddard, B; Maglioni, C; Versaci, R

    2012-01-01

    The Beam Dumping System for the Large Hadron Collider comprises for each ring a set of horizontally deflecting extraction kicker magnets, vertically deflecting steel septa, dilution kickers and finally, a couple of hundred meters further downstream, an absorber block. A mobile diluter (TCDQ) protects the superconducting quadrupole immediately downstream of the extraction as well as the arc at injection energy and the triplet aperture at top energy from bunches with small impact parameters, in case of a beam dump that is not synchronized with the particle free gap or a spontaneous firing of the extraction kickers. Simulations have shown that an asynchronous dump of a 7 TeV nominal beam into the TCDQ absorber blocks could damage it. This paper describes the proposed changes to this device in order to maintain the protection for the downstream elements while reducing the risk of damaging the TCDQ in case of such a beam loss.

  2. Ion beam dump for JT-60 NBI

    International Nuclear Information System (INIS)

    Kuriyama, Masaaki; Horiike, Hiroshi; Matsuda, Shinzaburo; Morita, Hiroaki; Shibanuma, Kiyoshi

    1981-10-01

    The design of the active cooling type ion beam dump for JT-60 NBI which receives the total beam power of 5.6 MW for 10 sec continuously is described. It is composed of array of many finned tubes which is made of oxygen free copper with 0.2% silver content. The safety margin against thermal and mechanical troubles is estimated by the heat transfer and the thermal stress calculation. (author)

  3. Uncoupled thermoelasticity solutions applied on beam dumps

    Directory of Open Access Journals (Sweden)

    A. Ouzia

    2016-06-01

    Full Text Available In particle accelerators the process of beam absorption is vital. At CERN particle beams are accelerated at energies of the order of TeV. In the event of a system failure or following collisions, the beam needs to be safely absorbed by dedicated protecting blocks. The thermal shock caused by the rapid energy deposition within the absorbing block causes thermal stresses that may rise above critical levels. The present paper provides a convenient expression of such stresses under hypotheses described hereafter. The temperature field caused by the beam energy deposition is assumed to be Gaussian. Such a field models a non-diffusive heat deposition. These effects are described as thermoelastic as long as the stresses remain below the proportional limit and can be analytically modeled by the coupled equations of thermoelasticity. The analytical solution to the uncoupled thermoelastic problem in an infinite domain is presented herein and matched with a finite unit radius sphere. The assumption of zero diffusion as well as the validity of the match with a finite geometry is quantified such that the obtained solutions can be rigorously applied to real problems. Furthermore, truncated series solutions, which are not novel, are used for comparison purposes. All quantities are nondimensional and the problem reduces to a dependence of five dimensionless parameters. The equations of elasticity are presented in the potential formulation where the shear potential is assumed to be nil due to the source being a gradient and the absence of boundaries. Nevertheless equivalent three-dimensional stresses are computed using the compressive potential and optimized using standard analytical optimization methods. An alternative algorithm for finding the critical points of the three-dimensional stress function is presented. Finally, a case study concerning the proton synchrotron booster dump is presented where the aforementioned analytical solutions are used and the

  4. Results from beam dump experiments at CERN

    International Nuclear Information System (INIS)

    Conforto, G.

    1981-01-01

    Two series of proton beam dump experiments are discussed. One of the main goals of the experiment was to test the hypothesis that neutrinos produced in such a setting arose entirely from charm production followed by either electronic or muonic decay. While much of the data is difficult to interpret, it does appear that this hypothesis is not an adequate explanation of the results, in particular the ratio of electron neutrinos to muon neutrinos

  5. The charged beam dumps for the international linear collider

    CERN Document Server

    Appleby, R; Broome, T; Densham, C; Vincke, H

    2006-01-01

    The baseline configuration of the International Linear Collider requires 2 beam dumps per interaction region, each rated to 18MW of beam power, together with additional beam dumps for tuning purposes and machine protection. The baseline design uses high pressure moving water dumps, first developed for the SLC and used in the TESLA design, although a gas based dump is also being considered. In this paper we discuss the progress made by the international community on both physics and engineering studies for the beam dumps.

  6. Manufacturing prototypes for LIPAC beam dump

    Energy Technology Data Exchange (ETDEWEB)

    Arranz, F., E-mail: fernando.arranz@ciemat.es [CIEMAT, Madrid (Spain); Brañas, B.; Iglesias, D. [CIEMAT, Madrid (Spain); Nomen, O. [IREC, Barcelona (Spain); Rapisarda, D.; Lapeña, J.; Muñoz, A. [CIEMAT, Madrid (Spain); Szcepaniak, B. [GALVANO-T, Windeck (Germany); Manini, J. [CARMAN, Madrid (Spain); Gómez, J. [TRINOS VACUUM, Valencia (Spain)

    2014-10-15

    Highlights: •Electroforming of copper and electronbeam welding techniques are compared. •Mechanical properties of Cu–stainless steel joint by electroforming are presented. •Achieved manufacturing tolerances are shown. •The difficulties and solutions for the complicated manufacturing are explained. -- Abstract: The purpose of the research is to define the most adequate manufacturing process for the dump of a linear deuteron accelerator. The deuteron beam can be pulsed as well as continuous with energies up to 9 MeV. The maximum beam power is 1.12 MW corresponding to a beam current of 125 mA. The requirements on the surface on which the deuterons will be stopped are quite demanding and the length and slenderness of the cone poses a considerable difficulty in the manufacturing process. The design of the beam dump is based on a copper cone 2500 mm long, 300 mm aperture and 5 to 6.5 mm thickness. Basically only two technologies were found feasible for the manufacturing of the cone: Electroforming and Electron Beam Welding (EBW). The article shows the main results found when manufacturing different prototypes.

  7. Injection and Dump Systems

    CERN Document Server

    Bracco, C; Barnes, M J; Carlier, E; Drosdal, L N; Goddard, B; Kain, V; Meddahi, M; Mertens, V; Uythoven, J

    2012-01-01

    Performance and failures of the LHC injection and ex- traction systems are presented. In particular, a comparison with the 2010 run, lessons learnt during operation with high intensity beams and foreseen upgrades are described. UFOs, vacuum and impedance problems related to the injection and extraction equipment are analysed together with possible improvements and solutions. New implemented features, diagnostics, critical issues of XPOC and IQC applications are addressed.

  8. Experimental use of neutrinos from ISABELLE beam dumps

    International Nuclear Information System (INIS)

    Bozoki, G.E.; Thorndike, A.M.; Mann, A.K.

    1978-01-01

    The technical feasibility and possible applicability of using ISABELLE beam dumps as powerful sources for directed high-energy neutrino bursts are investigated. In the present machine design two dump systems are applied to absorb the extracted fast beams. The expected normal beam extraction rate is 1 to 2 per day, when about (6.3 to 7.5) x 10 14 protons are hitting the external targets during a pulse length of approx. 50 μs. These protons are considered so far to be useless. The neutrinos produced could be used for the following activities: the study of coherent neutrino regeneration, calibration and permanent testing of cosmic-ray and astrophysical neutrino detectors, research on the practical applicability of neutrinos in telecommunication, and certain astro- and geophysical applications. Tailoring the system to meet these activities is illustrated. 6 figures

  9. The IFMIF-EVEDA accelerator beam dump design

    International Nuclear Information System (INIS)

    Iglesias, D.; Arranz, F.; Arroyo, J.M.; Barrera, G.; Branas, B.; Casal, N.; Garcia, M.; Lopez, D.; Martinez, J.I.; Mayoral, A.; Ogando, F.; Parro, M.; Oliver, C.; Rapisarda, D.; Sanz, J.; Sauvan, P.; Ibarra, A.

    2011-01-01

    The IFMIF-EVEDA accelerator will be a 9 MeV, 125 mA cw deuteron accelerator prototype for verifying the validity of the 40 MeV accelerator design for IFMIF. A beam dump designed for maximum power of 1.12 MW will be used to stop the beam at the accelerator exit. The conceptual design for the IFMIF-EVEDA accelerator beam dump is based on a conical beam stop made of OFE copper. The cooling system uses an axial high velocity flow of water pressurized up to 3.4 x 10 5 Pa to avoid boiling. The design has been shown to be compliant with ASME mechanical design rules under nominal full power conditions. A sensitivity analysis has been performed to take into account the possible margin on the beam properties at the beam dump entrance. This analysis together with the study of the maintenance issues and the mounting and dismounting operations has led to the complete design definition.

  10. Iodine Beam Dump Design and Fabrication

    Science.gov (United States)

    Polzin, K. A.; Bradley, D. E.

    2017-01-01

    During the testing of electric thrusters, high-energy ions impacting the walls of a vacuum chamber can cause corrosion and/or sputtering of the wall materials, which can damage the chamber walls. The sputtering can also introduce the constituent materials of the chamber walls into an experiment, with those materials potentially migrating back to the test article and coating it with contaminants over time. The typical method employed in this situation is to install a beam dump fabricated from materials that have a lower sputter yield, thus reducing the amount of foreign material that could migrate towards the test article or deposit on anything else present in the vacuum facility.

  11. Proposal for the award of a contract without competitive tendering for the supply of coaxial high-voltage cable for the LHC beam dumping system

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract without competitive tendering for the supply of two types of coaxial high-voltage cable for the LHC beam dumping system. Following a market survey carried out among 14 firms in four Member States, a call for tenders (IT-2969/SL/LHC) was sent on 10 July 2001 to one firm. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with DRAKA MULTIMEDIA CABLE (DE), the only bidder, for the supply of 14 km of coaxial high-voltage cable for the LHC beam dumping system for a total amount of 530 488 euros (779 900 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 100%.

  12. High power semiconductor switches in the 12 kV, 50 kA pulse generator of the SPS beam dump kicker system

    CERN Document Server

    Bonthond, J; Faure, P; Vossenberg, Eugène B

    2001-01-01

    Horizontal deflection of the beam in the dump kicker system of the CERN SPS accelerator is obtained with a series of fast pulsed magnets. The high current pulses of 50 kA per magnet are generated with capacitor discharge type generators which, combined with a resistive free-wheel diode circuit, deliver a critically damped half-sine current with a rise-time of 25 ms. Each generator consists of two 25 kA units, connected in parallel to a magnet via a low inductance transmission line.

  13. New concept for a high-power beam dump

    International Nuclear Information System (INIS)

    Moir, R.W.; Taylor, C.E.

    1980-01-01

    A new concept for a dump for the ion and neutral beams used in the controlled nuclear fusion program uses thin sheets of a refractory metal such as tungsten formed into troughs having semi-circular cross sections. High-velocity water flowing circumferentially removes heat by subcooled nucleate boiling. Possible advantages are modular construction, lower water-pumping power, and a lower pressure drop than in conventional beam dumps. An example design calculation is shown for a dump capable of absorbing an incident flux of 10 kW/cm 2

  14. A high average power beam dump for an electron accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xianghong, E-mail: xl66@cornell.edu [Cornell Laboratory of Accelerator-based Sciences and Education, Cornell University, Ithaca, NY 14853 (United States); Bazarov, Ivan; Dunham, Bruce M.; Kostroun, Vaclav O.; Li, Yulin; Smolenski, Karl W. [Cornell Laboratory of Accelerator-based Sciences and Education, Cornell University, Ithaca, NY 14853 (United States)

    2013-05-01

    The electron beam dump for Cornell University's Energy Recovery Linac (ERL) prototype injector was designed and manufactured to absorb 600 kW of electron beam power at beam energies between 5 and 15 MeV. It is constructed from an aluminum alloy using a cylindrical/conical geometry, with water cooling channels between an inner vacuum chamber and an outer jacket. The electron beam is defocused and its centroid is rastered around the axis of the dump to dilute the power density. A flexible joint connects the inner body and the outer jacket to minimize thermal stress. A quadrant detector at the entrance to the dump monitors the electron beam position and rastering. Electron scattering calculations, thermal and thermomechanical stress analysis, and radiation calculations are presented.

  15. Beam Dump TIDV #1 - Vacuum Failure of 17 Oct. 97

    CERN Document Server

    Ross, M; CERN. Geneva. SPS and LEP Division

    1997-01-01

    A vacuum leak on the internal beam dump TIDV precipitated its replacement in the LSS1 on Monday the 20th of October 1997, the SPS consequently being shut down for three days. The dump had fulfilled its design function since it was installed in the SPS at the beginning of 1988. Prior to the intervention, the Vacuum Group LHC/VAC carried out a number of leak tests, which led to the decision being taken to replace the dump. After the successful intervention, normal machine operation was resumed. Out-gassing of the ten-year-old replacement was initially high, but vacuum pressure is slowly descending to the SPS standard level.

  16. Beam Dump Design for the Rare Isotope Accelerator Fragmentation Line

    Energy Technology Data Exchange (ETDEWEB)

    Stein, W; Ahle, L E; Reyes, S

    2006-05-02

    Beam dumps for the heavy ion beams of the fragmentation line of the Rare Isotope Accelerator have been designed. The most severe operational case involves a continuous U beam impacting the beam dump with a power of 295 kW and a nominal spot diameter size of 5 cm. The dump mechanically consists of two rotating barrels with a water cooled outer wall of 2 mm thick aluminum. The barrels are 70 cm in diameter and axially long enough to intercept a variety of other beams. The aluminum wall absorbs approximately 15% of the U beam power with the rest absorbed in the water downstream of the wall. The water acts as an absorber of the beam and as a coolant for the 2 mm aluminum wall. The barrel rotates at less than 400 RPM, maximum aluminum temperatures are less than 100 C and maximum thermal fatigue stresses are low at 3.5 x 10{sup 7} Pa (5 ksi). Rotation of the dump results in relatively low radiation damage levels with an operating lifetime of years for most beams.

  17. First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit

    CERN Document Server

    Antoine, A; Magnin, N; Juteau, P; Voumard, N

    2011-01-01

    Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 μs beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented f...

  18. Neutronics Assessments for a RIA Fragmentation Line Beam Dump Concept

    CERN Document Server

    Boles, Jason; Reyes, Susana; Stein, Werner

    2005-01-01

    Heavy ion and radiation transport calculations are in progress for conceptual beam dump designs for the fragmentation line of the proposed Rare Isotope Accelerator (RIA). Using the computer code PHITS, a preliminary design of a motor-driven rotating wheel beam dump and adjacent downstream multipole has been modeled. Selected results of these calculations are given, including neutron and proton flux in the wheel, absorbed dose and displacements per atom in the hub materials, and heating from prompt radiation and from decay heat in the multipole.

  19. ALPtraum. ALP production in proton beam dump experiments

    International Nuclear Information System (INIS)

    Doebrich, Babette; Jaeckel, Joerg

    2015-12-01

    With their high beam energy and intensity, existing and near-future proton beam dumps provide an excellent opportunity to search for new very weakly coupled particles in the MeV to GeV mass range. One particularly interesting example is a so-called axion-like particle (ALP), i.e. a pseudoscalar coupled to two photons. The challenge in proton beam dumps is to reliably calculate the production of the new particles from the interactions of two composite objects, the proton and the target atoms. In this work we argue that Primakoff production of ALPs proceeds in a momentum range where production rates and angular distributions can be determined to sufficient precision using simple electromagnetic form factors. Reanalysing past proton beam dump experiments for this production channel, we derive novel constraints on the parameter space for ALPs. We show that the NA62 experiment at CERN could probe unexplored parameter space by running in 'dump mode' for a few days and discuss opportunities for future experiments such as SHiP.

  20. Bounds on light gluinos from the BEBC beam dump experiments

    International Nuclear Information System (INIS)

    Cooper-Sarkar, A.M.; Parker, M.A.; Sarkar, S.; Klein, H.; Morrison, D.R.O.; Schmid, P.; Wachsmuth, H.; Aderholz, M.; Schmitz, N.; Bostock, P.; Krstic, J.; Faccini-Turluer, M.L.; Vignaud, D.; Graessler, H.; Guy, J.; Venus, W.; Hulth, P.O.; Hultqvist, K.; Walck, C.; Idschok, U.; Kreutzmann, H.; Nellen, B.; Wuensch, B.

    1985-01-01

    Observational upper limits on anomalous neutral-current events in a proton beam dump experiment are used to constrain the possible hadroproduction and decay of light gluinos. These results require msub(g tilde) >= 4 GeV for Msub(q tilde) approx.= msub(w). (orig.)

  1. Bounds on light gluinos from the BEBC beam dump experiment

    Science.gov (United States)

    Cooper-Sarkar, A. M.; Parker, M. A.; Sarkar, S.; Aderholz, M.; Bostock, P.; Clayton, E. F.; Faccini-Turluer, M. L.; Grässler, H.; Guy, J.; Hulth, P. O.; Hultqvist, K.; Idschok, U.; Klein, H.; Kreutzmann, H.; Krstic, J.; Mobayyen, M. M.; Morrison, D. R. O.; Nellen, B.; Schmid, P.; Schmitz, N.; Talebzadeh, M.; Venus, W.; Vignaud, D.; Walck, Ch.; Wachsmuth, H.; Wünsch, B.; WA66 Collaboration

    1985-10-01

    Observational upper limits on anomalous neutral-current events in a proton beam dump experiment are used to constrain the possible hadroproduction and decay of light gluinos. These results require ifm g˜$̆4 GeV for ifm q˜ - minw.

  2. Detailed mechanical design of the LIPAc beam dump radiological shielding

    Energy Technology Data Exchange (ETDEWEB)

    Nomen, Oriol, E-mail: onomen@irec.cat [IREC, Barcelona, Catalonia (Spain); CDEI-UPC, Barcelona, Catalonia (Spain); Martínez, José I.; Arranz, Fernando; Iglesias, Daniel; Barrera, Germán; Brañas, Beatriz [CIEMAT, Madrid (Spain); Ogando, Francisco [UNED, Madrid (Spain); Molla, Joaquín [CIEMAT, Madrid (Spain); Sanmartí, Manel [IREC, Barcelona, Catalonia (Spain)

    2013-10-15

    Highlights: ► Mechanical design of the IFMIF LIPAc beam dump shielding has been performed. ► Lead shutter design performed to shield radiation from beam dump when LIPAc is off. ► External loads, working and dismantling conditions, included as design constraints. -- Abstract: The LIPAc is a 9 MeV, D{sup +} linear prototype accelerator for the validation of the IFMIF accelerator design. The high intensity, 125 mA CW beam is stopped in a copper cone involving a high production of neutrons and gamma radiation and activation of its surface. The beam stopper is surrounded by a shielding to attenuate the resulting radiation so that dose rate values comply with the limits at the different zones of the installation. The shielding includes for that purpose polyethylene rings, water tanks and gray cast iron rings. A lead shutter has also been designed to shield the gamma radiation that comes through the beam tube when the linear accelerator is not in operation, in order to allow access inside the building for maintenance tasks. The present work summarizes the detailed mechanical design of the beam dump shielding and the lead shutter taking into account the design constraints, such as working conditions and other external loads, as well as including provisions for dismantling.

  3. Irradiation Effects on RIA Fragmentation Cu Beam Dump

    CERN Document Server

    Reyes, Susana; Boles, Jason; Stein, Werner; Wirth, Brian

    2005-01-01

    Within the scope of conceptual R&D activities in support of the Rare-Isotope Accelerator (RIA) facility, high priority is given to the development of high-power fragmentation beam dumps. A pre-study was made of a static water-cooled Cu beam dump that can meet requirements for a 400 MeV/u uranium beam. The issue of beam sputtering was addressed and found to be not a significant issue. Preliminary radiation transport simulations show significant damage (dpa) in the vicinity of the Bragg peak of uranium ions. Experimental data show that defects in Cu following neutron or high-energy particle irradiation tend to saturate at doses between 1 and 5 dpa, and this saturation in defect density also results in saturation of mechanical property degradation. However, effects of swift heavy ion irradiation and the production of gaseous and solid transmutant elements still need to be addressed. Initial calculations indicate that He concentrations on the order of 100 appm are produced in the beam dump after several weeks...

  4. Energy deposition profile on ISOLDE Beam Dumps by FLUKA simulations

    CERN Document Server

    Vlachoudis, V

    2014-01-01

    In this report an estimation of the energy deposited on the current ISOLDE beam dumps obtained by means of FLUKA simulation code is presented. This is done for both ones GPS and HRS. Some estimations of temperature raise are given based on the assumption of adiabatic increase from energy deposited by the impinging protons. However, the results obtained here in relation to temperature are only a rough estimate. They are meant to be further studied through thermomechanical simulations using the energyprofiles hereby obtained.

  5. Thermal analysis of injection beam dump of high-intensity rapid-cycling synchrotron in J-PARC

    Science.gov (United States)

    Kamiya, J.; Saha, P. K.; Yamamoto, K.; Kinsho, M.; Nihei, T.

    2017-10-01

    The beam dump at the beam injection area in the J-PARC 3-GeV rapid cycling synchrotron (RCS) accepts beams that pass through the charge exchange foil without ideal electron stripping during the multi-turn beam injection. The injection beam dump consists of the beam pipe, beam stopper, radiation shield, and cooling mechanism. The ideal beam power into the injection beam dump is 400 W in the case of design RCS extraction beam power of 1 MW with a healthy foil, which has 99.7 % charge stripping efficiency. On the other hand, as a radiation generator, the RCS is permitted to be operated with maximum average beam power of 4 kW into the injection beam dump based on the radiation shielding calculation, in consideration of lower charge stripping efficiency due to the foil deterioration. In this research, to evaluate the health of the RCS injection beam dump system from the perspective of the heat generation, a thermal analysis was performed based on the actual configuration with sufficiently large region, including the surrounding concrete and soil. The calculated temperature and heat flux density distribution showed the validity of the mesh spacing and model range. The calculation result showed that the dumped 4 kW beam causes the temperature to increase up to 330, 400, and 140 °C at the beam pipe, beam stopper, and radiation shield, respectively. Although these high temperatures induce stress in the constituent materials, the calculated stress values were lower than the ultimate tensile strength of each material. Transient temperature analysis of the beam stopper, which simulated the sudden break of the charge stripper foil, demonstrated that one bunched beam pulse with the maximum beam power does not lead to a serious rise in the temperature of the beam stopper. Furthermore, from the measured outgassing rate of stainless steel at high temperature, the rise in beam line pressure due to additive outgassing from the heated beam pipe was estimated to have a negligible

  6. Resonant production of dark photons in positron beam dump experiments

    Science.gov (United States)

    Nardi, Enrico; Carvajal, Cristian D. R.; Ghoshal, Anish; Meloni, Davide; Raggi, Mauro

    2018-05-01

    Positrons beam dump experiments have unique features to search for very narrow resonances coupled superweakly to e+e- pairs. Due to the continued loss of energy from soft photon bremsstrahlung, in the first few radiation lengths of the dump a positron beam can continuously scan for resonant production of new resonances via e+ annihilation off an atomic e- in the target. In the case of a dark photon A' kinetically mixed with the photon, this production mode is of first order in the electromagnetic coupling α , and thus parametrically enhanced with respect to the O (α2)e+e-→γ A' production mode and to the O (α3)A' bremsstrahlung in e- -nucleon scattering so far considered. If the lifetime is sufficiently long to allow the A' to exit the dump, A'→e+e- decays could be easily detected and distinguished from backgrounds. We explore the foreseeable sensitivity of the Frascati PADME experiment in searching with this technique for the 17 MeV dark photon invoked to explain the Be 8 anomaly in nuclear transitions.

  7. Design and development of multi-megawatt beam dumps

    International Nuclear Information System (INIS)

    Haughian, J.M.; Cooper, W.S.; Paterson, J.A.

    1976-11-01

    The next generation of U.S. fusion experiments which includes TFTR, MFTF, and Doublet III, will utilize neutral-beam injection for plasma heating. TFTR, for example, desires 20 MW of 120-keV deuterium atoms in pulses of 0.5-sec duration. In order to meet these requirements, a 15-A, 120-keV, 0.5-sec pulse per minute module is presently under test at the neutral-beam test facility at the Lawrence Berkeley Laboratory. A 65-A, 120-keV, 0.5-sec module is under construction and is scheduled for assembly in April of this year. Some of the features of a calorimeter/beam dump that is presently being used in the testing and evaluation of these neutral beam sources are discussed

  8. Modernization of dump truck onboard system

    Science.gov (United States)

    Semenov, M. A.; Bolshunova, O. M.; Korzhev, A. A.; Kamyshyan, A. M.

    2017-10-01

    The review of the only automated dispatch system for the career dump trucks, which is presented in the domestic market, was made. A method for upgrading the loading control system and technological weighing process of the career dump was proposed. The cargo weight during loading is determined by the gas pressure in the suspension cylinders at the time of the oscillation ending and at the start of the vibration smoothing process; the smoothing speed correction is performed. The error of the cargo weighting is 2.5-3%, and of the technological weighing process during driving - 1%, which corresponds to the error level of the steady-state weighting means.

  9. Hydrodynamic calculations of 20-TeV beam interactions with the SSC beam dump

    International Nuclear Information System (INIS)

    Wilson, D.C.; Wingate, C.A.; Goldstein, J.C.; Godwin, R.P.; Mokhov, N.V.

    1993-01-01

    The 300μs, 400 MJ SSC proton beam must be contained when extracted to the external beam dump. The current design for the SSC beam dump can tolerate the beat load produced if the beam is deflected into a raster scan over the face of the dump. If the high frequency deflecting magnet were to fail, the beam would scan a single strip across the dump face resulting in higher local energy deposition. This could vaporize some material and lead to high pressures. Since the beam duration is comparable to the characteristic time of expected hydrodynamic motions, we have combined the static energy deposition capability of the MARS computer code with the two- and three-dimensional hydrodynamics of the MBA and SPHINX codes. EOS data suggest an energy deposition threshold of 15 kJ/g, below which hydrodynamic effects are minimal. Above this our 2D calculations show a hole boring rate of 7 cm/μs for the nominal beam, and pressures of a few kbar. Scanning the nominal beam faster than 0.08 cm/μs should minimize hydrodynamic effects. 3D calculations support this

  10. Conceptual Design of the LHC Beam Dumping Protection Elements TCDS and TCDQ

    CERN Document Server

    Goddard, B; Sans-Merce, M; Weterings, W

    2004-01-01

    The Beam Dumping System for the Large Hadron Collider, presently under construction at CERN, consists, per ring, of a set of horizontally deflecting extraction kicker magnets, vertically deflecting steel septa, dilution kickers and finally, a couple of hundred metres further downstream, an absorber block. A fixed diluter (TCDS) will protect the septa in the event of a beam dump that is not synchronised with the particle free gap or a spontaneous firing of the extraction kickers which will cause the beam to sweep over the septum. Another, mobile, diluter block (TCDQ) will protect the superconducting quadrupole immediate downstream of the extraction as well as the arc at injection energy and the triplet aperture at top energy from bunches with small impact parameters. This paper describes the conceptual design of the protection elements.

  11. New limits on hidden photons from past electron beam dumps

    International Nuclear Information System (INIS)

    Andreas, Sarah; Niebuhr, Carsten; Ringwald, Andreas

    2012-09-01

    Hidden sectors with light extra U(1) gauge bosons, so called hidden photons, have recently attracted some attention because they are a common feature of physics beyond the Standard Model like string theory and SUSY and additionally are phenomenologically of great interest regarding recent astrophysical observations. The hidden photon is already constrained by various laboratory experiments and presently searched for in running as well as upcoming experiments. We summarize the current status of limits on hidden photons from past electron beam dump experiments including two new limits from such experiments at KEK and Orsay that have so far not been considered. All our limits take into account the experimental acceptances obtained from Monte Carlo simulations.

  12. New limits on hidden photons from past electron beam dumps

    Energy Technology Data Exchange (ETDEWEB)

    Andreas, Sarah; Niebuhr, Carsten; Ringwald, Andreas

    2012-09-15

    Hidden sectors with light extra U(1) gauge bosons, so called hidden photons, have recently attracted some attention because they are a common feature of physics beyond the Standard Model like string theory and SUSY and additionally are phenomenologically of great interest regarding recent astrophysical observations. The hidden photon is already constrained by various laboratory experiments and presently searched for in running as well as upcoming experiments. We summarize the current status of limits on hidden photons from past electron beam dump experiments including two new limits from such experiments at KEK and Orsay that have so far not been considered. All our limits take into account the experimental acceptances obtained from Monte Carlo simulations.

  13. Analysis of RHIC beam dump pre-fires

    International Nuclear Information System (INIS)

    Zhang, W.; Ahrens, L.; Fischer, W.; Hahn, H.; Mi, J.; Sandberg, J.; Tan, Y.

    2011-01-01

    It has been speculated that the beam may cause instability of the RHIC Beam Abort Kickers. In this study, we explore the available data of past beam operations, the device history of key modulator components, and the radiation patterns to examine the correlations. The RHIC beam abort kicker system was designed and built in the 90's. Over last decade, we have made many improvements to bring the RHIC beam abort kicker system to a stable operational state. However, the challenge continues. We present the analysis of the pre-fire, an unrequested discharge of kicker, issues which relates to the RHIC machine safety and operational stability.

  14. Development of the heat sink structure of a beam dump for the proton accelerator

    International Nuclear Information System (INIS)

    Maeng, W. Y.; Gil, C. S.; Kim, J. H.; Kim, D. H.

    2007-01-01

    The beam dump is the essential component for the good beam quality and the reliable performance of the proton accelerator. The beam dump for a 20 MeV and 20 mA proton accelerator was designed and manufactured in this study. The high heats deposited, and the large amount of radioactivity produced in beam dump should be reduced by the proper heat sink structure. The heat source by the proton beam of 20 MeV and 20 mA was calculated. The radioactivity assessments of the beam dump were carried out for the economic shielding design with safety. The radioactivity by the protons and secondary neutrons in designed beam dump were calculated in this sturdy. The effective engineering design for the beam dump cooling was performed, considering the mitigation methods of the deposited heats with small angle, the power densities with the stopping ranges in the materials and the heat distributions in the beam dump. The heat sink structure of the beam dump was designed to meet the accelerator characteristics by placing two plates of 30 cm by 60 cm at an angle of 12 degree. The highest temperatures of the graphite, copper, and copper faced by cooling water were designed to be 223 degree, 146 degree, and 85 degree, respectively when the velocity of cooling water was 3 m/s. The heat sink structure was manufactured by the brazing graphite tiles to a copper plate with the filler alloy of Ti-Cu-Ag. The brazing procedure was developed. The tensile stress of the graphite was less than 75% of a maximum tensile stress during the accelerator operation based on the analysis. The safety analyses for the commissioning of the accelerator operation were also performed. The specimens from the brazed parts of beam dump structure were made to identify manufacturing problems. The soundness of the heat sink structure of the beam dump was confirmed by the fatigue tests of the brazed specimens of the graphite-copper tile components with the repetitive heating and cooling. The heat sink structure developed

  15. Thermal, mechanical and fluid flow aspects of the high power beam dump for FRIB

    Energy Technology Data Exchange (ETDEWEB)

    Avilov, Mikhail [Facility for Rare Isotope Beams, Michigan State University, East Lansing, MI 48824 (United States); Aaron, Adam [Oak Ridge National Laboratory, PO Box 2008, Oak Ridge, TN 37831 (United States); Amroussia, Aida [Department of Chemical Engineering and Materials Science, Michigan State University, East Lansing, MI 48824 (United States); Bergez, Wladimir [Institut de Mecanique des Fluides de Toulouse, Toulouse University, CNRS, Allée Camille Soula, 31400 Toulouse (France); Boehlert, Carl [Department of Chemical Engineering and Materials Science, Michigan State University, East Lansing, MI 48824 (United States); Burgess, Thomas; Carroll, Adam [Oak Ridge National Laboratory, PO Box 2008, Oak Ridge, TN 37831 (United States); Colin, Catherine [Institut de Mecanique des Fluides de Toulouse, Toulouse University, CNRS, Allée Camille Soula, 31400 Toulouse (France); Durantel, Florent [Centre des recherches sur les Ions, les Materiaux et la Photonique (CIMAP) CEA-CNRS-ENSICAEN-UCN, BP 5133, 14070 CAEN CEDEX 5 (France); Ferrante, Paride; Fourmeau, Tiffany [Facility for Rare Isotope Beams, Michigan State University, East Lansing, MI 48824 (United States); Graves, Van [Oak Ridge National Laboratory, PO Box 2008, Oak Ridge, TN 37831 (United States); Grygiel, Clara [Centre des recherches sur les Ions, les Materiaux et la Photonique (CIMAP) CEA-CNRS-ENSICAEN-UCN, BP 5133, 14070 CAEN CEDEX 5 (France); Kramer, Jacob [Facility for Rare Isotope Beams, Michigan State University, East Lansing, MI 48824 (United States); Mittig, Wolfgang [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Monnet, Isabelle [Centre des recherches sur les Ions, les Materiaux et la Photonique (CIMAP) CEA-CNRS-ENSICAEN-UCN, BP 5133, 14070 CAEN CEDEX 5 (France); Patel, Harsh [Facility for Rare Isotope Beams, Michigan State University, East Lansing, MI 48824 (United States); and others

    2016-06-01

    The Facility for Rare Isotope Beams (FRIB) under construction at Michigan State University is based on a 400 kW heavy ion accelerator and uses in-flight production and separation to generate rare isotope beams. The first section of the fragment separator houses the rare isotope production target, and the primary beam dump to stop the unreacted primary beam. The experimental program will use 400 kW ion beams from {sup 16}O to {sup 238}U. After interaction with the production target, over 300 kW in remaining beam power must be absorbed by the beam dump. A rotating water-cooled thin-shell metal drum was chosen as the basic concept for the beam dump. Extensive thermal, mechanical and fluid flow analyses were performed to evaluate the effects of the high power density in the beam dump shell and in the water. Many properties were optimized simultaneously, such as shell temperature, mechanical strength, fatigue strength, and radiation resistance. Results of the analyses of the beam dump performance with different design options will be discussed. For example, it was found that a design modification to the initial water flow pattern resulted in a substantial increase in the wall heat transfer coefficient. A detailed evaluation of materials for the shell is in progress. The widely used titanium alloy, Ti–6Al–4V (wt%), is presently considered as the best candidate, and is the subject of specific tests, such as studies of performance under heavy ion irradiation.

  16. Energy deposition profile for modification proposal of ISOLDE’s HRS Beam Dump, from FLUKA simulations

    CERN Document Server

    Vlachoudis, V

    2014-01-01

    The current ISOLDE HRS beam dump has been found to be unsuitable on previous simulations, due to thermomechanical stresses. In this paper a proposal for modifying HRS dump is studied using FLUKA. The energy deposited in this modified beam dump and the amount of neutrons streaming to the tunnel area are scored and compared with the simulation of current dump. Two versions of the modification have been assessed, determining which of them is more desirable in terms of influence of radiation on ISOLDE’s tunnel. Finally, a rough estimate of temperature raise in the modified dump is shown. Further conclusions on the adequacy of these modifications need to include the thermomechanical calculations’ results, based on those presented here.

  17. Simulation of the Beam Dump for a High Intensity Electron Gun

    CERN Document Server

    Doebert, S; Lefevre, T; Pepitone, K

    2014-01-01

    The CLIC Drive Beam is a high-intensity pulsed electron beam. A test facility for the Drive Beam electron gun will soon be commissioned at CERN. In this contribution we outline the design of a beam dump / Faraday cup capable of resisting the beam’s thermal load. The test facility will operate initially up to 140 keV. At such low energies, the electrons are absorbed very close to the surface of the dump, leading to a large energy deposition density in this thin layer. In order not to damage the dump, the beam must be spread over a large surface. For this reason, a small-angled cone has been chosen. Simulations using Geant4 have been performed to estimate the distribution of energy deposition in the dump. The heat transport both within the electron pulse and between pulses has been modelled using finite element methods to check the resistance of the dump at high repetition rates. In addition, the possibility of using a moveable dump to measure the beam profile and emittance is discussed.

  18. High power beam dump project for the accelerator prototype LIPAc: cooling design and analysis

    International Nuclear Information System (INIS)

    Parro Albeniz, M.

    2015-01-01

    an angle of 3.5o, 2.5 m long and 5 mm width. This part is cooled by water flowing on its external surface through the channel formed between the copper cone and a concentric piece with the latter. The thesis is developed in this realm, and its objective is designing the LIPAc beam dump cooling system...(Author)

  19. Design of a beam dump for the IFMIF-EVEDA accelerator

    International Nuclear Information System (INIS)

    Branas, B.; Iglesias, D.; Arranz, F.; Barrera, G.; Casal, N.; Garcia, M.; Gomez, J.; Lopez, D.; Martinez, J.I.; Martin-Fuertes, F.; Ogando, F.; Oliver, C.; Sanz, J.; Sauvan, P.; Ibarra, A.

    2009-01-01

    The IFMIF-EVEDA accelerator will be a 9 MeV, 125 mA cw deuteron accelerator prototype for verifying the validity of the accelerator design for IFMIF. A beam stop will be used for the RFQ and DTL commissioning as well as for the EVEDA accelerator tests. Therefore, this component must be designed to stop 5 MeV and 9 MeV deuteron beams with a maximum power of 1.13 MW. The first step of the design is the beam-facing material selection. The criteria used for this selection are low neutron production, low activation and good thermomechanical behavior. In this paper, the mechanical analysis and radioprotection calculations that have led to the choice of the main beam dump parameters will be described. The present design is based on a conical beam stop (2.5 m length, 30 cm diameter, and 3.5 mm thickness) made of copper plus a cylindrical 0.5 m long beam scraper. The cooling system is based on an axial high velocity flow of water. This design is compliant with the mechanical design rules during full power stationary operation of the accelerator. The radioprotection calculations performed demonstrate that, with an adequate local shielding, doses during beam on/off phases are below the limits.

  20. Design of multi-megawatt actively cooled beam dumps for the Neutral-Beam Engineering Test Facility

    International Nuclear Information System (INIS)

    Paterson, J.A.; Koehler, G.; Wells, R.P.

    1981-10-01

    The Neutral Beam Engineering Test Facility will test Neutral Beam Sources up to 170 keV, 65 Amps, with 30 second beam-on times. For this application actively cooled beam dumps for both the neutral and ionized particles will be required. The dumps will be able to dissipate a wide range of power density profiles by utilizing a standard modular panel design which is incorporated into a moveable support structure. The thermal hydraulic design of the panels permit the dissipation of 2 kW/cm 2 anywhere on the panel surface. The water requirements of the dumps are optimized by restricting the flow to panel sections where the heat flux falls short of the design value. The mechanical design of the beam-dump structures is described along with tests performed on a prototype panel. The prototype tests were performed on two different panel designs, one manufactured by Mc Donnell Douglas (MDAC) the other by United Technologies (UT). The dissipation capabilities of the panels were tested at the critical regions to verify their use in the beam dump assemblies

  1. Beam systems without failures - What can be done?

    International Nuclear Information System (INIS)

    Solfaroli Camillocci, M.; Uythoven, J.

    2012-01-01

    The beam dumps at 3.5 TeV triggered by interlocks not related to the magnet powering are discussed. This concerns the systems like the RF, the transverse feedbacks, beam instrumentation, beam dumping system, collimators and control systems. An analysis of the reasons of these dumps is presented together with a possible strategy to mitigate the effect of these failures. It is very important to notice that no system has been identified to have any structural problem

  2. Properties and interactions of neutrino (1977-1980) beam dump experiments

    International Nuclear Information System (INIS)

    Tsukerman, I.S.

    1981-01-01

    Data on search of instantaneous muon and electron neutrinos in experiments of beam dump type are presented in the review. Neutrino is formed in decays of particles rusulted from pN interactions. First experiments of the dump beam type have been realized at the CERN/SPS accelerator in 1975 and Serpukhov accelerator by the ITEF-IFVE group in 1977 with proton energies of 26 and 70 GeV, respectively. The results of beam dump experiments of the second generation in 1979 in CERN are considered in detail. These experiments have been intended for measuring the effect of instantaneous neutrino. The conclusion is drawn on the presence of instantaneous muon neutrinos in the above experiments [ru

  3. Activation of the IFMIF prototype accelerator and beam dump by deuterons and protons

    Czech Academy of Sciences Publication Activity Database

    Simakov, S. P.; Bém, Pavel; Burjan, Václav; Fischer, U.; Forrest, R.A.; Götz, Miloslav; Honusek, Milan; Klein, H.; Kroha, Václav; Novák, Jan; Sauer, A.; Šimečková, Eva; Tiede, R.

    2008-01-01

    Roč. 83, 10-12 (2008), s. 1543-1547 ISSN 0920-3796 R&D Projects: GA MPO 2A-1TP1/101 Institutional research plan: CEZ:AV0Z10480505 Keywords : IFMIF * Protons and deuterons accelerator * Beam dump Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders Impact factor: 0.828, year: 2008

  4. New exclusion limits for dark gauge forces from beam-dump data

    Energy Technology Data Exchange (ETDEWEB)

    Bluemlein, Johannes [Deutsches Elektronen-Synchrotron (DESY), Zeuthen (Germany); Brunner, Juergen [Deutsches Elektronen-Synchrotron (DESY), Zeuthen (Germany); CPPM, Aix-Marseille Univ. (France). CNRS/IN2P3

    2011-04-15

    We re-analyze proton beam dump data taken at the U70 accelerator at IHEP Serpukhov with the {nu}-calorimeter I experiment in 1989 to set mass-coupling limits for dark gauge forces. The corresponding data have been used for axion and light Higgs particle searches before. We determine new mass and coupling exclusion bounds for dark gauge bosons. (orig.)

  5. Design for a 1.3 MW, 13 MeV Beam Dump for an Energy Recovery Linac

    CERN Document Server

    Sinclair, Charles K; Smith, Colin H

    2005-01-01

    The electron beam exiting an Energy Recovery Linac (ERL) is dumped close to the injection energy. This energy is chosen as low as possible while allowing the beam quality specifications to be met. As ERLs are designed for high average beam current, beam dumps are required to handle high beam power at low energy. Low energy electrons have a short range in practical dump materials, requiring the beam size at the dump face be enlarged to give acceptable power densities and heat fluxes. Cornell University is developing a 100 mA average current ERL as a synchrotron radiation source. The 13 MeV optimum injection energy requires a 1.3 MW beam dump. We present a mature design for this dump, using an array of water-cooled extruded copper tubes. This array is mounted in the accelerator vacuum normal to the beam. Fatigue failure resulting from abrupt thermal cycles associated with beam trips is a potential failure mechanism. We report on designs for a 75 kW, 750 keV tube-cooled beryllium plate dump for electron gun test...

  6. Proposal for the award of a contract for the supply of moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel for the LHC beam dumping system

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel for the three different types of fast pulsed magnets for the beam dumping system of the LHC. Following a market survey carried out among 14 firms in four Member States and six firms in two non-Member States, a call for tenders (IT-2674/SL/LHC) was sent on 26 January 2001 to one firm in one Member State. By the closing date, CERN had received a tender from the firm. The Finance Committee is invited to agree to the negotiation of a contract with TELMAG MAGNETIC COMPONENTS (UK), the only bidder, for the supply of 2885 moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel, of three different types, for a total amount of 2 414 664 euros (3 692 147 Swiss francs), not subject to revision, with options for 560 additional moulded core assemblies of three different types, for an additional amount of 468 496 euros (716 355 Swiss francs), not subject to revision,...

  7. Fluka studies of the Asynchronous Beam Dump Effects on LHC Point 6

    CERN Document Server

    Versaci, R; Goddard, B; Mereghetti, A; Schmidt, R; Vlachoudis, V; CERN. Geneva. ATS Department

    2011-01-01

    The LHC is a record-breaking machine for beam energy and intensity. An intense effort has therefore been deployed in simulating critical operational scenarios of energy deposition. Using FLUKA Monte Carlo simulations, we have investigated the effects of an asynchronous beam dump at the LHC Point 6 where beams, with a stored energy of 360 MJ, can instantaneously release up to a few J cm^-3 in the cryogenic magnets which have a quench limit of the order of the mJ cm^-3. In the present paper we will describe the simulation approach, and discuss the evaluated maximum energy release onto the superconducting magnets during an asynchronous beam dump. We will then analyze the shielding provided by collimators installed in the area and discuss safety limits for the operation of the LHC.

  8. Fluka Studies of the Asynchronous Beam Dump Effects on LHC Point 6 for a 7 TeV beam

    CERN Document Server

    VERSACI, R; GODDARD, B; MEREGHETTI, A; SCHMIDT, R; VLACHOUDIS, V

    2012-01-01

    The LHC is a record-breaking machine for beam energy and intensity. An intense effort has therefore been deployed in simulating critical operational scenarios of energy deposition. Using FLUKA Monte Carlo simulations, we have investigated the effects of an asynchronous beam dump at the LHC Point 6 where beams, with a stored energy of 360 MJ, can instantaneously release up to a few J cm^{-3} in the cryogenic magnets which have a quench limit of the order of the mJ cm^{-3}. In the present paper we will describe the simulation approach, and discuss the evaluated maximum energy release onto the superconducting magnets during an asynchronous beam dump of a 7 TeV beam. We will then analyze the shielding provided by collimators installed in the area and discuss safety limits for the operation of the LHC.

  9. Beam Dumping Ghost Signals in Electric Sweep Scanners

    International Nuclear Information System (INIS)

    Stockli, M.P.; Leitner, M.; Keller, R.; Moehs, D.P.; Welton, R.F.

    2005-01-01

    Over the last 20 years many labs started to use Allison scanners to measure low-energy ion beam emittances. We show that large trajectory angles produce ghost signals due to the impact of the beamlet on the electric deflection plates. The strength of the ghost signal is proportional to the amount of beam entering the scanner. Depending on the ions and their velocity, ghost signals can have the opposite polarity as the main beam signals or the same polarity. These ghost signals are easily overlooked because they partly overlap the real signals, they are mostly below the 1% level, and they are often hidden in the noise. However, they cause significant errors in emittance estimates because they are associated with large trajectory angles. The strength of ghost signals, and the associated errors, can be drastically reduced with a simple modification of the deflection plates

  10. Beam dumping ghost signals in electric sweep scanners

    International Nuclear Information System (INIS)

    Stockli, M.P.; SNS Project, Oak Ridge; Tennessee U.; Leitner, M.; LBL, Berkeley; Moehs, D.P.; Keller, R.; LBL, Berkeley; Welton, R.F.; SNS Project, Oak Ridge

    2004-01-01

    Over the last 20 years many labs started to use Allison scanners to measure loW--energy ion beam emittances. We show that large trajectory angles produce ghost signals due to the impact of the beamlet on the electric deflection plates. The strength of the ghost signal is proportional to the amount of beam entering the scanner. Depending on the ions and their velocity, ghost signals can have the opposite polarity as the main beam signals or the same polarity. These ghost signals are easily overlooked because they partly overlap the real signals, they are mostly below the 1% level, and they are often hidden in the noise. However, they cause significant errors in emittance estimates because they are associated with large trajectory angles. The strength of ghost signals, and the associated errors, can be drastically reduced with a simple modification of the deflection plates

  11. Optimization of Front Axle Suspension System of Articulated Dump Truck

    DEFF Research Database (Denmark)

    Langer, Thomas Heegaard; Christensen, Brian B.; Mouritsen, Ole Ø.

    2010-01-01

    that has been subjected to comfort improvement is a two axle articulated dump truck. The comfort has been in terms of whole body vibration exposure and the overall improvement has been made possible by adding front axle suspension. However, a hydraulic stabilizing system between the tractor and trailer...... to evaluate the whole body vibrations. By use of a multibody simulation model of the dump truck the whole body vibration exposure has been computed using the predefined work cycle as model input. The design parameters comprise the components of the hydraulic subsystem of the suspension, i.e., the size...

  12. RF generation in the DARHT Axis-II beam dump

    Energy Technology Data Exchange (ETDEWEB)

    Ekdahl, Carl A. Jr. [Los Alamos National Laboratory

    2012-05-03

    We have occasionally observed radio-frequency (RF) electromagnetic signals in the downstream transport (DST) of the second axis linear induction accelerator (LIA) at the dual-axis radiographic hydrodynamic testing (DARHT) facility. We have identified and eliminated some of the sources by eliminating the offending cavities. However, we still observe strong RF in the range 1 GHz t0 2 GHz occurring late in the {approx}2-{micro}s pulse that can be excited or prevented by varying the downstream tune. The narrow frequency width (<0.5%) and near exponential growth at the dominant frequency is indicative of a beam-cavity interaction, and electro-magnetic simulations of cavity structure show a spectrum rich in resonances in the observed frequency range. However, the source of beam produced RF in the cavity resonance frequency range has not been identified, and it has been the subject of much speculation, ranging from beam-plasma or beam-ion instabilities to unstable cavity coupling.

  13. Dark Matter Search in a Proton Beam Dump with MiniBooNE.

    Science.gov (United States)

    Aguilar-Arevalo, A A; Backfish, M; Bashyal, A; Batell, B; Brown, B C; Carr, R; Chatterjee, A; Cooper, R L; deNiverville, P; Dharmapalan, R; Djurcic, Z; Ford, R; Garcia, F G; Garvey, G T; Grange, J; Green, J A; Huelsnitz, W; de Icaza Astiz, I L; Karagiorgi, G; Katori, T; Ketchum, W; Kobilarcik, T; Liu, Q; Louis, W C; Marsh, W; Moore, C D; Mills, G B; Mirabal, J; Nienaber, P; Pavlovic, Z; Perevalov, D; Ray, H; Roe, B P; Shaevitz, M H; Shahsavarani, S; Stancu, I; Tayloe, R; Taylor, C; Thornton, R T; Van de Water, R; Wester, W; White, D H; Yu, J

    2017-06-02

    The MiniBooNE-DM Collaboration searched for vector-boson mediated production of dark matter using the Fermilab 8-GeV Booster proton beam in a dedicated run with 1.86×10^{20} protons delivered to a steel beam dump. The MiniBooNE detector, 490 m downstream, is sensitive to dark matter via elastic scattering with nucleons in the detector mineral oil. Analysis methods developed for previous MiniBooNE scattering results were employed, and several constraining data sets were simultaneously analyzed to minimize systematic errors from neutrino flux and interaction rates. No excess of events over background was observed, leading to a 90% confidence limit on the dark matter cross section parameter, Y=ε^{2}α_{D}(m_{χ}/m_{V})^{4}≲10^{-8}, for α_{D}=0.5 and for dark matter masses of 0.01dark matter. This is the best limit from a dedicated proton beam dump search in this mass and coupling range and extends below the mass range of direct dark matter searches. These results demonstrate a novel and powerful approach to dark matter searches with beam dump experiments.

  14. Burnout experiment in subcooled forced-convection boiling of water for beam dumps of a high power neutral beam injector

    International Nuclear Information System (INIS)

    Horiike, Hiroshi; Kuriyama, Masaaki; Morita, Hiroaki

    1982-01-01

    Experimental studies were made on burnout heat flux in highly subcooled forced-convection boiling of water for the design of beam dumps of a high power neutral beam injector for Japan Atomic Energy Research Institute Tokamak-60. These dumps are composed of many circular tubes with two longitudinal fins. The tube was irradiated with nonuniformly distributed hydrogen ion beams of 120 to 200 kW for as long as 10 s. The coolant water was circulated at flow velocities of 3 to 7.5 m/s at exit pressures of 0.4 to 0.9 MPa. The burnout and film-boiling data were obtained at local heat fluxes of 8 to 15 MW/m 2 . These values were as high as 2.5 times larger than those for the circumferentially uniform heat flux case with the same parameters. These data showed insensitivity to local subcooling as well as to pressure, and simple burnout correlations were derived. From these results, the beam dumps have been designed to receive energetic beam fluxes of as high as 5 MW/m 2 with a margin of a factor of 2 for burnout

  15. Spiral kicker for the beam abort system

    Energy Technology Data Exchange (ETDEWEB)

    Martin, R.L.

    1983-01-01

    A brief study was carried out to determine the feasibility of a special kicker to produce a damped spiral beam at the beam dump for the beam abort system. There appears to be no problem with realizing this concept at a reasonably low cost.

  16. Spiral kicker for the beam abort system

    International Nuclear Information System (INIS)

    Martin, R.L.

    1983-01-01

    A brief study was carried out to determine the feasibility of a special kicker to produce a damped spiral beam at the beam dump for the beam abort system. There appears to be no problem with realizing this concept at a reasonably low cost

  17. Mechanical Design of a Heavy Ion Beam Dump for the RIA Fragmentation Line

    Energy Technology Data Exchange (ETDEWEB)

    Stein, W; Ahle, L E; Conner, D L

    2005-04-28

    The RIA fragmentation line requires a beam stop for the primary beam downstream of the first dipole magnet. The beam may consist of U, Ca, Sn, Kr, or O ions. with a variety of power densities. The configuration with highest power density is for the U beam, with a spot size of 3 cm x 3 cm and a total power of up to 300 kW. The mechanical design of the dump that meets these criteria consists of a 70 cm diameter aluminum wheel with water coolant channels. A hollow drive shaft supplies the coolant water and connects the wheel to an electrical motor located in an adjacent air space. The beam strikes the wheel along the outer perimeter and passes through a thin window of aluminum where 15% of its power is absorbed and the remainder of the beam is absorbed in flowing water behind the window. Rotation of the wheel at 400 RPM results in maximum aluminum temperatures below 100 C and acceptably low thermal stresses of 3 ksi. Rotating the wheel also results in low radiation damage levels by spreading the damage out over the whole perimeter of the wheel. For some of the other beams, a stationary dump consisting of a thin aluminum window with water acting as a coolant and absorber appears to be feasible.

  18. Dark Matter Search in a Beam-Dump eXperiment (BDX) at Jefferson Lab

    International Nuclear Information System (INIS)

    Battaglieri, M.

    2016-01-01

    MeV-GeV dark matter (DM) is theoretically well motivated but remarkably unexplored. This proposal presents the MeV-GeV DM discovery potential for a ∼ 1 m$^3$ segmented CsI(Tl) scintillator detector placed downstream of the Hall A beam-dump at Jefferson Lab, receiving up to 10 22 electrons-on-target (EOT) in 285 days. This experiment (Beam-Dump eXperiment or BDX) would be sensitive to elastic DM-electron and to inelastic DM scattering at the level of 10 counts per year, reaching the limit of the neutrino irreducible background. The distinct signature of a DM interaction will be an electromagnetic shower of few hundreds of MeV, together with a reduced activity in the surrounding active veto counters. A detailed description of the DM particle χ production in the dump and subsequent interaction in the detector has been performed by means of Monte Carlo simulations. Different approaches have been used to evaluate the expected backgrounds: the cosmogenic background has been extrapolated from the results obtained with a prototype detector running at INFN-LNS (Italy), while the beam-related background has been evaluated by GEANT4 Monte Carlo simulations. The proposed experiment will be sensitive to large regions of DM parameter space, exceeding the discovery potential of existing and planned experiments in the MeV-GeV DM mass range by up to two orders of magnitude.

  19. Dark Matter Search in a Beam-Dump eXperiment (BDX) at Jefferson Lab

    Energy Technology Data Exchange (ETDEWEB)

    Battaglieri, M. [Univ. of Genova (Italy). National Institute for Nuclear Physics. et al

    2016-07-05

    MeV-GeV dark matter (DM) is theoretically well motivated but remarkably unexplored. This proposal presents the MeV-GeV DM discovery potential for a $\\sim$1 m$^3$ segmented CsI(Tl) scintillator detector placed downstream of the Hall A beam-dump at Jefferson Lab, receiving up to 10$^{22}$ electrons-on-target (EOT) in 285 days. This experiment (Beam-Dump eXperiment or BDX) would be sensitive to elastic DM-electron and to inelastic DM scattering at the level of 10 counts per year, reaching the limit of the neutrino irreducible background. The distinct signature of a DM interaction will be an electromagnetic shower of few hundreds of MeV, together with a reduced activity in the surrounding active veto counters. A detailed description of the DM particle $\\chi$ production in the dump and subsequent interaction in the detector has been performed by means of Monte Carlo simulations. Different approaches have been used to evaluate the expected backgrounds: the cosmogenic background has been extrapolated from the results obtained with a prototype detector running at INFN-LNS (Italy), while the beam-related background has been evaluated by GEANT4 Monte Carlo simulations. The proposed experiment will be sensitive to large regions of DM parameter space, exceeding the discovery potential of existing and planned experiments in the MeV-GeV DM mass range by up to two orders of magnitude.

  20. Mechanical Design of a Heavy Ion Beam Dump for the RIA Fragmentation Line

    CERN Document Server

    Stein, Werner; Conner, David L

    2005-01-01

    The RIA fragmentation line requires a beam stop for the primary beam downstream of the first dipole magnet. The beam may consist of U, Ca, Sn, Kr, or O ions. with a variety of power densities. The configuration with highest power density is for the U beam, with a spot size of 3 cm x 3 cm and a total power of up to 300 kW. The mechanical design of the dump that meets these criteria consists of a 50 cm diameter aluminum wheel with water coolant channels. A hollow drive shaft supplies the coolant water and connects the wheel to an electrical motor located in an air space in the floor above the dump. The beam strikes the wheel along the outer perimeter and passes through a thin window of aluminum where 10% of its power is absorbed and the remainder of the beam is absorbed in flowing water behind the window. Rotation of the wheel at 400 RPM results in maximum aluminum temperatures below 100 C and acceptably low thermal stresses of 5 ksi. Rotating the wheel also results in low radiation damage levels by spreading t...

  1. Design of a Compact Dump Resistor System for LCD Magnet

    CERN Document Server

    Gaddi, A

    2010-01-01

    In this technical note we suggest a possible solution for the choice of the detector magnet dump resistor. The push-pull scenario for Linear Collider Detectors imposes new solutions for magnet powering and protection lines, else than what developed for LHC detectors. The magnet dump resistor is the protecting equipment that has the function of extracting a significant amount of magnetic stored energy, from the coil winding to a dump. The LCD magnet has to move with the experiment from the garage to the beam position, so it has to be compact and reliable at the same time. We make here a proposal for a passive water-cooled dumper, we calculate the minimum amount of water required, the resistor hot-spot temperature, the overall mechanical design. The electrical part is not covered by this note, as it can be assumed that the solutions adopted by LHC detector magnets, in terms of quench instrumentation, energy extraction and maximum voltage, are not significantly affected by the push-pull scenario.

  2. FLUKA Studies of the Asynchronous Beam Dump Effects on LHC Point 6

    CERN Document Server

    Versaci, R; Goddard, B; Schmidt, R; Vlachoudis, V; Mereghetti, A

    2011-01-01

    The LHC is a record-breaking machine for beam energy and intensity. An intense effort has therefore been deployed in simulating critical operational scenarios of energy deposition. FLUKA is the most widely used code for this kind of simulations at CERN because of the high reliability of its results and the ease to custom detailed simulations all along hundreds of meters of beam line. We have investigated the effects of an asynchronous beam dump on the LHC Point 6 where, beams with a stored energy of 360 MJ, can instantaneously release up to a few J cm−3 in the cryogenic magnets which have a quench limit of the order of the mJ cm−3. In the present paper we will describe the simulation approach, and discuss the evaluated maximum energy release onto the superconducting magnets during an asynchronous beam dump. We will then analyse the shielding provided by collimators installed in the area and discuss safety limits for the operation of the LHC.

  3. Layout considerations on the 25GeV/300kW beam dump of the XFEL project

    International Nuclear Information System (INIS)

    Maslov, M.; Sychev, V.; Schmitz, M.

    2006-08-01

    The European X-Ray Free Electron Laser (XFEL) project, which is currently under design at DESY, requires 3 beam dumps downstream of the accelerator. By means of energy deposition, temperature and mechanical stress calculations the layout of a solid edge cooled beam dump is presented. This dump is able to withstand a high cyclic impact, as induced by each subsequent bunch train of up to 2.5.10 13 electrons in combination with a large amount of dissipated power density (∼1.8 kW/cm) coming from a beam with an average power of up to 300 kW at a variable energy up to 25 GeV. The cyclic impact is faced by using graphite as a core material in the dump and setting a lower limit for the incoming beam size at σ beam ≥2 mm. Introducing a slow (not within the bunch train) circular beam sweep answers the question of heat extraction. Alternative layouts are investigated in order to avoid active beam sweeping. Unfortunately more severe risks and disadvantages are coming along with them. That is why theses solutions are not regarded as reliable alternatives and the dump design with beam sweeping is considered to be the baseline solution, for which a technical layout is under way. (orig.)

  4. Layout considerations on the 25GeV/300kW beam dump of the XFEL project

    Energy Technology Data Exchange (ETDEWEB)

    Maslov, M.; Sychev, V. [Institute for High Energy Physics (IHEP), Protvino (Russian Federation); Schmitz, M. [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany)

    2006-08-15

    The European X-Ray Free Electron Laser (XFEL) project, which is currently under design at DESY, requires 3 beam dumps downstream of the accelerator. By means of energy deposition, temperature and mechanical stress calculations the layout of a solid edge cooled beam dump is presented. This dump is able to withstand a high cyclic impact, as induced by each subsequent bunch train of up to 2.5.10{sup 13} electrons in combination with a large amount of dissipated power density ({approx}1.8 kW/cm) coming from a beam with an average power of up to 300 kW at a variable energy up to 25 GeV. The cyclic impact is faced by using graphite as a core material in the dump and setting a lower limit for the incoming beam size at {sigma}{sub beam}{>=}2 mm. Introducing a slow (not within the bunch train) circular beam sweep answers the question of heat extraction. Alternative layouts are investigated in order to avoid active beam sweeping. Unfortunately more severe risks and disadvantages are coming along with them. That is why theses solutions are not regarded as reliable alternatives and the dump design with beam sweeping is considered to be the baseline solution, for which a technical layout is under way. (orig.)

  5. THE RHIC BEAM ABORT KICKER SYSTEM

    International Nuclear Information System (INIS)

    Hahn, H.

    1999-01-01

    THE ENERGY STORED IN THE RHIC BEAM IS ABOUT 200 KJ PER RING AT DESIGN ENERGY AND INTENSITY. TO PREVENT QUENCHING OF THE SUPERCONDUCTING MAGNETS OR MATERIAL DAMAGE, THE BEAM WILL BE SAFELY DISPOSED OF BY AN INTERNAL BEAM ABORT SYSTEM, WHICH INCLUDES THE KICKER MAGNETS, THE PULSED POWER SUPPLIES, AND THE DUMP ABSORBER. DISPOSAL OF HEAVY IONS, SUCH AS GOLD, IMPOSES DESIGN CONSTRAINTS MORE SEVERE THAN THOSE FOR PROTON BEAMS OF EQUAL INTENSITY. IN ORDER TO MINIMIZE THE THERMAL SHOCK IN THE CARBON-FIBER DUMP BLOCK, THE BUNCHES MUST BE LATERALLY DISPERSED

  6. LHC Asynchronous Beam Dump: Study of new TCDQ model and effects on downstream magnets

    CERN Document Server

    Versaci, R; Vlachoudis, V

    2012-01-01

    An asynchronous beam dump is one of the most critical accidents the LHC could face. In the effort to have a better protection of the machine, and to increase the robustness of the protection device itself, new models for the TCDQ (Target Collimator Dump Quadrupole) have been proposed and are under evaluation. Within this frame we have performed FLUKA evaluation of the energy deposition on one of the proposed models and on the downstream quadrupoles, MQY.4R6 and MQY.5R6, in order to evaluate the protection provided by the proposed model. The results of our study are compared to a similar one for a different proposed model and are input for the evaluation of the heat load on the proposed collimator.

  7. LHC Beam Dump Design Study - Part III : Off-normal operating conditions

    CERN Document Server

    Bruno, L; Ross, M; Sala, P

    2000-01-01

    The LHC beam dump design study has been preliminarily substantiated by energy deposition simulations (Part I) and heat transfer analyses (Part II). The present report is devoted to the abnormal operating conditions induced by a malfunction of the beam diluters. A general approach to the analysis of off-normal operation is presented, which is derived from standard design norms adopted in the nuclear industry. Attention is focused mainly on the carbon core, which is longitudinally split into segments of different density in order to better distribute the deposited energy. The maximum energy density it absorbs decreases by at least 33%, compared to a uniform standard density carbon core. This structure may sustain any partial sweep failure without major damage, up to the ultimate beam intensity and energy. To minimise the risks inherent in a fully unswept beam, a sacrificial graphite mandrel will be placed on the core axis, surrounded by a thick high strength carbon-carbon composite tube. With this arrangement, ...

  8. Design of the calorimeter and beam dump for the TFTR prototype neutral beam injector

    International Nuclear Information System (INIS)

    Stone, R.R.; Haughian, J.M.

    1977-01-01

    A calorimeter has been designed for use with the TFTR prototype neutral beam injection system. It consists of three vees each having two 18.8-mm-thick (0.75 in.) copper plates at a 6-deg angle, relative to the beam centerline. The maximum power density on a plate with this arrangement will be 2.0 kW/cm 2 , resulting in a front surface temperature rise of about 420 0 C. A support and retraction system moves the calorimeter in and out of the beam centerline. Various factors used in the selection of the absorber plate material will be discussed and also some experimental test results will be presented

  9. Hidden photons in beam dump experiments and in connection with dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Andreas, Sarah

    2012-12-15

    Hidden sectors with light extra U(1) gauge bosons, so-called hidden photons, recently received much interest as natural feature of beyond standard model scenarios like string theory and SUSY and because of their possible connection to dark matter. This paper presents limits on hidden photons from past electron beam dump experiments including two new limits from experiments at KEK and Orsay. Additionally, various hidden sector models containing both a hidden photon and a dark matter candidate are discussed with respect to their viability and potential signatures in direct detection.

  10. Hidden photons in beam dump experiments and in connection with dark matter

    International Nuclear Information System (INIS)

    Andreas, Sarah

    2012-12-01

    Hidden sectors with light extra U(1) gauge bosons, so-called hidden photons, recently received much interest as natural feature of beyond standard model scenarios like string theory and SUSY and because of their possible connection to dark matter. This paper presents limits on hidden photons from past electron beam dump experiments including two new limits from experiments at KEK and Orsay. Additionally, various hidden sector models containing both a hidden photon and a dark matter candidate are discussed with respect to their viability and potential signatures in direct detection.

  11. Development of offroad unmanned dump truck navigation system. Dump truck mujin soko system no kaihatsu ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Horii, Z [Nittetsu Mining Co. Ltd., Tokyo (Japan)

    1992-08-25

    A large offroad unmanned dump truck navigation system has been developed, and is in practical operation mounted on dump trucks at Torigatayama Limestone Quarry of Nittetsu Mining Company. The system functions in a manual dump truck navigation mode, wireless navigation mode, and unmanned control mode. The unmanned control mode further includes a mode to navigate the truck on a predetermined course with its data having been input in a computer and a mode that when the truck was moved on a course under a wireless control, the computer learns the course and drives the truck autonomously thereafter. The safety measures are divided into the hardware safety function to detect abnormalities in brakes and other vehicle parts, and the software safety functions of data communications, sensor action check, and prevention of collision of trucks with each other. The system has resulted in a productivity of average one-way travel distance of 345 m, and average unmanned navigation cycle time of 9 minutes and 26 seconds for a transportation efficiency of 541 t/hour/truck, having reached at least the manned operation level. 4 figs., 1 tab.

  12. New exclusion limits for dark gauge forces from proton Bremsstrahlung in beam-dump data

    Energy Technology Data Exchange (ETDEWEB)

    Bluemlein, Johannes [Deutsches Elektronen-Synchrotron (DESY), Zeuthen (Germany); Brunner, Juergen [Aix-Marseille Univ. CNRS/IN2P3 (France). CPPM

    2013-11-15

    We re-analyze published proton beam dump data taken at the U70 accelerator at IHEP Serpukhov with the {nu}-calorimeter I experiment in 1989 to set mass-coupling limits for dark gauge forces. The corresponding data have been used for axion and light Higgs particle searches before. More recently, limits on dark gauge forces have been derived from this data set, considering a dark photon production from {pi}{sup 0}-decay. Here we determine extended mass and coupling exclusion bounds for dark gauge bosons ranging to masses m{sub {gamma}'} of 624 MeV at admixture parameters {epsilon}{approx_equal}10{sup -6} considering high-energy Bremsstrahlung of the U-boson of the initial proton beam and different detection mechanisms.

  13. Design of an 18 MW vortex flow water beam dump for 500 GeV electrons/positrons of an international linear collider

    International Nuclear Information System (INIS)

    Satyamurthy, Polepalle; Rai, Pravin; Tiwari, Vikas; Kulkarni, Kiran; Amann, John; Arnold, Raymond G.; Walz, Dieter; Seryi, Andrei; Davenne, Tristan; Caretta, Ottone; Densham, Chris; Appleby, Robert B.

    2012-01-01

    Beam dumps are essential components of any accelerator system. They are usually located at the end of the beam delivery systems and are designed to safely absorb and dissipate the particle energy. In the second stage of the proposed International Linear Collider (ILC), the electron and positron beams are accelerated to 500 GeV each (1 TeV total). Each bunch will have 2×10 10 electrons/positrons, and 2820 bunches form one beam bunch train with time duration of 0.95 ms and 4 Hz frequency. The average beam power will be 18 MW with a peak power of 4.5 GW. The FLUKA code was used to determine the power deposited by the beam at all critical locations. This data forms the input into the thermal hydraulic analysis CFD code for detailed flow and thermal evaluation. Both 2D and 3D flow analyses were carried out at all the critical regions to arrive at optimum geometry and flow parameters of the beam dump. The generation and propagation of pressure waves due to rapid deposition of heat has also been analyzed.

  14. Results of a beam dump experiment at the CERN SPS neutrino facility

    Directory of Open Access Journals (Sweden)

    T. Hansl

    1978-03-01

    Full Text Available We report results from a beam dump experiment that has been performed at the CERN SPS neutrino facility using the CDHS neutrino counter detector. Limits on dimuon and trimuon production by new penetrating neutral particles are given. A new source of prompt electron and muon neutrinos has been observed giving (1.2±0.4× 10−7 νe or νμ per incident proton with neutrino angle smaller than 1.85 mrad and Eν > 20 GeV. If these prompt neutrinos are attributed to charmed meson pair production, the inclusive DD production cross section could be of the order of 30 ωb. If axions are existing their production rate relative to π0 mesons is found to be less than 0.5 × 10−8.

  15. Search for tau-neutrino interactions in the BEBC beam dump experiment

    Science.gov (United States)

    Talebzadeh, M.; Guy, J.; Venus, W.; Aderholz, M.; Barnham, K. W. J.; Bostock, P.; Clayton, E. F.; Cooper-Sarkar, A. M.; Faccini-Turluer, M. L.; Grässler, H.; Hultquist, K.; Hulth, P. O.; Kreutzmann, H.; Krstic, J.; Miller, D. B.; Mobayyen, M. M.; Myatt, G.; Nellen, B.; Parker, M. A.; Schmitz, N.; Sewell, S.; Simopoulou, E.; Vayaki, A.; Vignaud, D.; Wachsmuth, H.; Wittek, W.; Wünsch, B.; BEBC WA66 Collaboration

    A novel and efficient kinematic method is used to estimate the number of ντ charged current interactions with Eν > 20 GeV in the BEBC beam dump experiment. The result, -14±12 ντ events, is consistent with zero. The ratio of D s to D meson production in 400 GeV proton interactions in copper is estimated to be below 0.65 at 90% c.l. The oscillation probability P( νe→ ντ) averaged over the electron-(anti)neutrino spectrum is found to be below 18%. The hypothesis that νe and ντ are identical is excluded by about 6 standard deviations. A remarkable event is described: it contains a muon, a high pT photon and a high pT hadron.

  16. Search for tau-neutrino interactions in the BEBC beam dump experiment

    International Nuclear Information System (INIS)

    Talebzadeh, M.; Barnham, K.W.J.; Clayton, E.F.; Miller, D.B.; Mobayyen, M.M.; Guy, J.; Venus, W.; Cooper-Sarkar, A.M.; Sewell, S.; Bostock, P.; Krstic, J.; Myatt, G.; Simopoulou, E.; Vayaki, A.

    1987-01-01

    A novel and efficient kinematic method is used to estimate the number of ν τ charged current interactions with E ν > 20 GeV in the BEBC beam dump experiment. The result, -14±12 ν τ events, is consistent with zero. The ratio of D s to D meson production in 400 GeV proton interactions in copper is estimated to be below 0.65 at 90% c.l. The oscillation probability P(ν c → ν τ ) averaged over the electron-(anti)neutrino spectrum is found to be below 18%. The hypothesis that ν c and ν τ are identical is excluded by about 6 standard deviations. A remarkable event is described: it contains a muon, a high p T photon and a high p T hadron. (orig.)

  17. Search for heavy neutrino decays in the BEBC beam dump experiment

    Science.gov (United States)

    Cooper-Sarkar, A. M.; Haywood, S. J.; Parker, M. A.; Sarkar, S.; Barnham, K. W. J.; Bostock, P.; Faccini-Turluer, M. L.; Grässler, H.; Guy, J.; Hulth, P. O.; Hultqvist, K.; Idschok, U.; Klein, H.; Kreutzmann, H.; Krstic, J.; Mobayyen, M. M.; Morrison, D. R. O.; Nellen, B.; Talebzadeh, M.; Venus, W.; Vignaud, D.; Wachsmuth, H.; Wittek, W.; Wünsch, B.; WA66 Collaboration

    1985-10-01

    New limits on lepton mixing parameters are derived from a search for decays of heavy neutrinos in a proton beam dump experiment. The limits | Uøi| 2, | Ue i| 2 < 10 -6-10 -7 are obtained for neutrino mass eigenstates vi of mass between 0.5 and 1.75 GeV, which can be produced through mixing in charmed D meson decays. This is the first such limit on | Uøi| 2 for neutrino masses greater than 0.5 GeV. For the mass eigenstate v3 in particular, we obtain the limits | Uø3 | 2 < 10 -7-10 -8, | Ue3 | 2 < 10 -9-10 -10 for the mass range 150-190 MeV, assuming the v3 to be produced directly in charmed F meson decays.

  18. Wheel slip dump valve for railway braking system

    Science.gov (United States)

    Zhang, Xuan; Zhang, LiHao; Li, QingXuan; Shi, YanTao

    2017-09-01

    As we all know, pneumatic braking system plays an important role in the safety of the whole vehicle. In the anti slip braking system, the pressure of braking cylinder can be adjusted by the quick power response of wheel slip dump valve, so that the lock situation won’t occur during vehicle service. During the braking of railway vehicles, the braking force provided by braking disc reduces vehicle’s speed. But the locking slip will happen due to the oversize of braking force or the reduction of sticking coefficient between wheel and rail. It will cause not only the decline of braking performance but also the increase of braking distance. In the meanwhile, it will scratch the wheel and influence the stable running of vehicles. Now, the speed of passenger vehicle has been increased. In order to shorten the braking distance as far as possible, sticking stickiness must be fully applied. So the occurrence probability of wheel slip is increased.

  19. SHiP: a new multipurpose beam-dump experiment at the SPS.

    CERN Document Server

    AUTHOR|(SzGeCERN)387671

    2016-01-01

    SHiP is an experiment to look for very weakly interacting particles at a new to be constructed beam-dum p facility at the CERN SPS. The SHiP Technical Proposal has been submitted to the CERN SPS Committee in April 2015. The 400 GeV/c proton beam extracted from the SPS will be dumped on a heavy target with the aim of integ rating $2\\times 10^{20}$ proton on target in five years. A detector located downstream of the target, based on a long vacuum tank followed by a spectrometer and particle identification detectors, will allow probing a variety of models with light long-lived exotic particles and masses below a few GeV/c$^2$. The main focus will be the physics of the so-called Hidden Portals, i.e. search for Dark Photons, Light scalars and pseudo-scalars, and Heavy Neutral Leptons (HNL). The sensitivity to HNL will allow for the first time to probe, in the mass range between the kaon and the charm meson mass, a coupling range for which Baryogenesis and active neutrino masses could also be explained...

  20. Search for Light Dark Matter Produced in a Proton Beam Dump

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, Remington Tyler [Indiana Univ., Bloomington, IN (United States)

    2017-01-01

    Cosmological observations indicate that our universe contains dark matter (DM), yet we have no measurements of its microscopic properties. Whereas the gravitational interaction of DM is well understood, its interaction with the Standard Model is not. Direct detection experiments, the current standard, search for a nuclear recoil interaction and have a low-mass sensitivity edge of order 1 GeV. A path to detect DM with mass below 1 GeV is the use of accelerators producing boosted low-mass DM. Using neutrino detectors to search for low-mass DM is logical due to the similarity of the DM and neutrino signatures in the detector. The MiniBooNE experiment, located at Fermilab on the Booster Neutrino Beamline, has produced the first proton beam-dump light DM search results. Using dark matter scattering from nucleons 90% confidence limits were set over a large parameter space and, to allow tests of other theories, a model independent DM rate was extracted.

  1. Search for heavy neutrino decays in the BEBC beam dump experiment

    International Nuclear Information System (INIS)

    Cooper-Sarkar, A.M.; Haywood, S.J.; Parker, M.A.; Sarkar, S.; Klein, H.; Morrison, D.R.O.; Wachsmuth, H.; Barnham, K.W.J.; Mobayyen, M.M.; Talebzadeh, M.; Bostock, P.; Krstic, J.; Graessler, H.

    1985-01-01

    New limits on lepton mixing parameters are derived from a search for decays of heavy neutrinos in a proton beam dump experiment. The limits vertical strokeUsub(μi)vertical stroke 2 , vertical strokeUsub(ei)vertical stroke 2 -6 -10 -7 are obtained for neutrino mass eigenstates νsub(i) of mass between 0.5 and 1.75 GeV, which can be produced through mixing in charmed D meson decays. This is the first such limit on vertical strokeUsub(νi)vertical stroke 2 for neutrino masses greater than 0.5 GeV. For the mass eigenstate ν 3 in particular, we obtain the limits vertical strokeUsub(μ3)vertical stroke 2 -7 -10 -8 . vertical strokeUsub(e3)vertical stroke 2 -9 -10 -10 for the mass range 150-190 MeV, assuming the ν 3 to be produced directly in charmed F meson decays. (orig.)

  2. Beam raster system at CEBAF

    International Nuclear Information System (INIS)

    Yan, C.; Beaufait, J.; Brindza, P.; Carlini, R.; Vulcan, W.; Wines, R.

    1993-01-01

    A cascade raster system will be used in Hall C at CEBAF to generate a variable rastering pattern on the polarized target, the cryogenic hydrogen target, and the beam dump with adjustable frequency up to 10 kHz and variable deflection angle from 0.05 mr to 1 mr. Each raster consists of two air-core bedstead coils providing transverse and vertical scans. The magnets are energized by individual MOS power amplifiers controlled by a scan generator which determines frequency, amplitude, and phase shift between the cascade rasters

  3. Measurements of Linac4 H$^{-}$ ion source beam with a magnetized Einzel lens electron dump

    CERN Document Server

    Midttun, O; Scrivens, R

    2014-01-01

    Linac4 is a part of the upgrade of CERN’s accelerator complex for increased luminosity in the LHC. A new system to extract the ion beam from the plasma generator has been designed and tested, in order to improve the reliability and beam optics of the pulsed H- ion source. This paper presents the successfully implemented extraction system and three different beam measurements. The simulations compare well to the measurements and show that the plasma density was too low for the extraction system design during the measurements.

  4. Energy dump of the ATLAS superconducting system simulations of electrical and thermal behaviour of magnet system at slow- and fast dump

    CERN Document Server

    van Beek, Martijn; Dudarev, A

    During the slow dump (discharge) of the Barrel Toroidal (superconducting) magnet of the ATLAS detector, the control system gave an alarm that the differences between the voltages over the conductors were too high. The alarm was not due to any danger, because of some sort of phenomenon observed in the first few seconds after start of the discharge. A possible explanation of the differences of the coil voltages is that the changing current through the conductors may cause induced currents in the coil casing around. The goal was to make a simulation of the electrical behaviour of the magnet system during a slow dump. In this way, an explanation can be found for the start phenomenon of the slow dump of the Barrel Toroid. Some extra analyses on the measurements were performed to describe the energy dissipation during a fast dump. This is done by calculating the resistance of the coils during the dump. With the maximum resistance, the maximum temperature can be estimated, which says something about the enthalpy of ...

  5. Design and construction of a resistive energy dump device for bipolar superconducting magnet systems

    Energy Technology Data Exchange (ETDEWEB)

    Mohan, M. J.

    1977-05-01

    When superconducting magnets quench, the resistance of the conductor material rises rapidly to its normal value. This increase in resistance can result in catastrophic heating in the magnet unless stored field energy is quickly removed from the system. Phase inversion is the normal mode of energy removal. SCR's in the power supply are phased back, the output of the supply is inverted, and magnetic field energy is directed back into the utility grid. Under certain conditions, however, the power supply may fail to invert properly, and an alternate energy removal scheme must protect the superconducting magnet system. Composed of an isolation switch, a semiconductor switching module, and a dump resistor, the resistive dump device provides a viable protection scheme. Operationally, several conditions are capable of activating the isolation switch and triggering the bipolar SCR switching module. Manual dump commands, for instance, permit the operator to dump field energy in the event of observed abnormalities. A special voltage tap quench detector senses the aforementioned abnormal power supply output inversion and also fires the dump circuit. Regardless of the nature of the trigger input, however, activation of the energy dump device diverts coil current through the dump resistor. I/sup 2/R losses over time then safely dissipate stored magnetic field energy.

  6. AIP Diffraction measurements using the LHC Beam Loss Monitoring System

    CERN Document Server

    Kalliokoski, Matti

    2017-01-01

    The Beam Loss Monitoring (BLM) system of the Large Hadron Collider protects the machine from beam induced damage by measuring the absorbed dose rates of beam losses, and by triggering beam dump if the rates increase above the allowed threshold limits. Although the detection time scales are optimized for multi-turn losses, information on fast losses can be recovered from the loss data. In this paper, methods in using the BLM system in di ff raction studies are discussed.

  7. Diffraction measurements using the LHC Beam Loss Monitoring System

    Science.gov (United States)

    Kalliokoski, Matti

    2017-03-01

    The Beam Loss Monitoring (BLM) system of the Large Hadron Collider protects the machine from beam induced damage by measuring the absorbed dose rates of beam losses, and by triggering beam dump if the rates increase above the allowed threshold limits. Although the detection time scales are optimized for multi-turn losses, information on fast losses can be recovered from the loss data. In this paper, methods in using the BLM system in diffraction studies are discussed.

  8. Accelerator physics studies on the effects from an asynchronous beam dump onto the LHC experimental region collimators

    CERN Document Server

    Lari, L; Boccone, V; Bruce, R; Cerutti, F; Rossi, A; Vlachoudis, V; Mereghetti, A; Faus-Golfe, A

    2012-01-01

    Asynchronous beam aborts at the LHC are estimated to occur on average once per year. Accelerator physics studies of asynchronous dumps have been performed at different beam energies and beta-stars. The loss patterns are analyzed in order to identify the losses in particular on the Phase 1 Tertiary Collimators (TCT), since their tungsten-based active jaw insert has a lower damage threshold than the carbon-based other LHC collimators. Settings of the tilt angle of the TCTs are discussed with the aim of reducing the thermal loads on the TCT themselves.

  9. Recuperation of ISR Dipole Magnet Yokes for Use as Shielding for the LHC Beam Dumps TDE

    CERN Document Server

    Ross, M

    1999-01-01

    The quantity of iron shielding required for two LHC dumps was estimated at about 1500 tons. Possible sources of slightly irradiated iron shielding were considered, in particular, the ISR dipole yokes, which were stocked in the I2. Of rectangular form and weighing 22 tons each, they were well suited to the LHC dump geometry. Furthermore, they were to all intents and purposes non-radioactive. The preferred solution was to cut off four lifting pads and three support plates using arc/air equipment, seal temporarily each end with shutters, fit two lifting "anchor" pins, and fill with concrete.

  10. Dumping convention

    International Nuclear Information System (INIS)

    Roche, P.

    1992-01-01

    Sea dumping of radioactive waste has, since 1983, been precluded under a moratorium established by the London Dumping Convention. Pressure from the nuclear industry to allow ocean dumping of nuclear waste is reported in this article. (author)

  11. Radiation damage and waste management options for the sombrero final focus system and neutron dumps

    International Nuclear Information System (INIS)

    Reyes, S.; Latkowski, J.F.; Meier, W.R.; Reyes, S.

    2000-01-01

    Previous studies of the safety and environmental aspects of the SOMBRERO inertial fusion energy (IFE) power plant design did not completely address the issues associated with the final focus system. While past work calculated neutron fluences for a grazing incidence metal mirror (GIMM) and a final focus mirror, scattering off of the final optical component was not included, and thus, fluences in the final focus mirror were significantly underestimated. In addition, past work did not consider neutron-induced gamma-rays. Finally, power plant lifetime waste volumes may have been underestimated as neutron activation of the neutron dumps and building structure were not addressed. In the present work, a modified version of the SOMBRERO target building is presented where a significantly larger open solid-angle fraction (5%) is used to enhance beam smoothing of a diode-pumped solid-state laser (DPSSL). The GIMMs are replaced with transmissive fused silica wedges and have been included in three-dimensional neutron and photon transport calculations. This work shows that a power plant with a large open solid-angle fraction, needed for beam smoothing with a DPSSL, is acceptable from tritium breeding, and neutron activation points-of-view. (authors)

  12. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  13. Research on hydraulic system of KZC-5 type rear dump truck in underground mine

    International Nuclear Information System (INIS)

    Lei Zeyong

    2005-01-01

    KZC-5 type rear dump truck in underground mine is introduced in this paper. The determining principles and ways of two main hydraulic systems are discussed. It has been proved that the hydraulic systems are reasonable in the industrial scale test. (author)

  14. Dark matter search in a Beam-Dump eXperiment (BDX) at Jefferson Lab: an update on PR12-16-001

    Energy Technology Data Exchange (ETDEWEB)

    Battaglieri, M. [Istituto Nazionale di Fisica Nucleare (INFN), Genova (Italy); et. al.

    2017-12-07

    This document is an update to the proposal PR12-16-001 Dark matter search in a Beam-Dump eXperiment (BDX) at Jefferson Lab submitted to JLab-PAC44 in 2016 reporting progress in addressing questions raised regarding the beam-on backgrounds. The concerns are addressed by adopting a new simulation tool, FLUKA, and planning measurements of muon fluxes from the dump with its existing shielding around the dump. First, we have implemented the detailed BDX experimental geometry into a FLUKA simulation, in consultation with experts from the JLab Radiation Control Group. The FLUKA simulation has been compared directly to our GEANT4 simulations and shown to agree in regions of validity. The FLUKA interaction package, with a tuned set of biasing weights, is naturally able to generate reliable particle distributions with very small probabilities and therefore predict rates at the detector location beyond the planned shielding around the beam dump. Second, we have developed a plan to conduct measurements of the muon ux from the Hall-A dump in its current configuration to validate our simulations.

  15. Creating, Storing, and Dumping Low and High Resolution Graphics on the Apple IIe Microcomputer System.

    Science.gov (United States)

    Fletcher, Richard K., Jr.

    This description of procedures for dumping high and low resolution graphics using the Apple IIe microcomputer system focuses on two special hardware configurations that are commonly used in schools--the Apple Dot Matrix Printer with the Apple Parallel Interface Card, and the Imagewriter Printer with the Apple Super Serial Interface Card. Special…

  16. Evaluation of the Energy Deposition in the event of an Asynchronous Beam Dump for a 7 TeV beam on the new TCDQ model proposed for the LHC

    CERN Document Server

    Versaci, R; CERN. Geneva. ATS Department

    2012-01-01

    An asynchronous beam dump is one of the most critical accident the LHC could face. In the effort to have a better protection of the machine, a new model for the TCDQ (Target Collimator Dump Quadrupole) has been proposed and is under evaluation. Within this frame we have performed FLUKA evaluation of the energy deposition. The results of our simulations are also input for the evaluation of the heat load on the collimator.

  17. Radiation Simulations and Development of Concepts for High Power Beam Dumps, Catchers and Pre-separator Area Layouts for the Fragment Separators for RIA

    CERN Document Server

    Ronningen, Reginald; Beene, James R; Blideanu, Valetin; Boles, Jason; Bollen, Georg; Burgess, Thomas; Carter, Ken; Conner, David L; Gabriel, Tony A; Geissel, Hans; Gomes, Itacil C; Heilbronn, Lawrence; Iwase, Hiroshi; Lawton, Don; Levand, Anthony; Mansur, Louis; Momozaki, Yoichi; Morrissey, David; Nolen, Jerry; Reed, Claude; Remec, Igor; Rennich, Mark; Reyes, Susana; Sherrill, Bradley; Stein, Werner; Stoyer, Mark; Stracener, Dan; Wendel, Mark; Zeller, Al

    2005-01-01

    The development of high-power beam dumps and catchers, and pre-separator layouts for proposed fragment separators of the Rare-Isotope Accelerator (RIA) facility are important in realizing how to handle the 400 kW in the primary beam. We will present examples of pre-conceptual designs of beam dumps, fragment catchers, and the pre-separator layout. We will also present examples of ongoing work on radiation simulations using the heavy-ion-transport code PHITS, characterizing the secondary radiation produced by the high-power ion beams interacting with these devices. Results on radiation heating of targets, magnet coils, associated hardware and shielding, component activation, and levels of radiation dose will be presented. These initial studies will yield insight into the impact of the high-power dissipation on fragment separator design, remote handling concepts, nuclear safety and potential facility hazard classification, shielding design, civil construction design, component design, and material choices. Furth...

  18. Upgrade of the TCDQ: A dumping protection system for the LHC

    CERN Document Server

    Antonakakis, T

    2012-01-01

    In the context of the LHC, an asynchronous beam dump could be destructive. In order to ensure the safety of the machine and its surroundings a model of the TCDQ dump has been designed. The length of the TCDQ dump is increased by 50% and its material distribution along its length is changed from graphite to a carbon composite that clearly withstands higher stresses then its counterpart. There are two different density composites used along the dump‘s length in a similar distribution than that of the TCDS, varying from high density to low then back to high. The power deposition within the duration of a pulse is given by FLUKA simulations and is used to predict temperature and stress distributions in space and time. The results are compared with previous studies in which graphite material was used. The difference in the thermal expansion coefficient of the two materials explains the reduced stresses in the newer design. Due to the high cost of carbon composites an alternative solution is thought without jeopar...

  19. Using geographical information systems (GIS to examine sanitary implications of rubbish dump locations at human activity centres

    Directory of Open Access Journals (Sweden)

    Lenos Koku Ankrah

    2016-01-01

    Full Text Available This study sought to investigate health risks that refuse dump locations have on people. The global positioning systems (GPS were used to take location coordinates of 28 rubbish dump centers and human activity centers (clinics, restaurants, markets etc spread across a university campus in Ghana. The ArcGIS software was used to plot the coordinates and draw a buffer of 50 meters around the rubbish dump locations (RDL to show the closeness between the dump sites and the human activity centers (HAC, and the sanitary implications of the closeness. More than 90% of the HACs fell within the 50 meters buffer zone of the rubbish dump sites. The findings indicated that some sensitive HACs like food joints, laundries etc. were less than 15 meters from rubbish dump sites. The findings confirmed that the location of rubbish dump sites pose serious threat to the health of the human community in the university. The findings of this study can be used to make evidence- based decisions about possible relocation of rubbish dump containers in the university. This study is also an initiative to set the tone for more detailed research work on the health implications of rubbish disposal management on Ghanaians.

  20. PLT and Doublet III neutral beam injection systems

    International Nuclear Information System (INIS)

    Haselton, H.H.; Dagenhart, W.K.; Schechter, D.E.; Stewart, L.D.; Stirling, W.L.

    1976-01-01

    The design program is being supported by experimental work with all beam line components: gas cells, bending magnets, beam stops, magnetic shielding, and high speed-high throughput cryopumping systems. Stray toroidal fields and fields produced by external transmission or mirror magnets are under study to determine the optimum means of removing the unneutralized component from the beam. Concepts utilizing materials with high permeability are adequate to provide the source with the necessary magnetic shielding. Beam stops capable of dissipating a power density of 10 to 40 kW/cm 2 are required for ion dumps, diagnostics, and on line ion source conditioning

  1. Reconstruction of steam generators super emergency feadwater supply system (SHNC) and steam dump stations to the atmosphere system PSA

    International Nuclear Information System (INIS)

    Kuzma, J.

    2001-01-01

    Steam Generators Super Emergency Feadwater Supply System (SHNC) and Steam Dump Stations to the Atmosphere System (PSA) are two systems which cooperate to remove residual heat from reactor core after seismic event. SHNC assure feeding of the secondary site of steam generator (Feed) where after heat removal.from primary loops, is relieved to the atmosphere by PSA (Bleed) in form of steam. (author)

  2. Adaptive control system of dump truck traction electric drive

    Science.gov (United States)

    Bolshunova, O. M.; Korzhev, A. A.; Kamyshyan, A. M.

    2018-03-01

    The paper describes the operational factors that determine the accident rate of a quarry motor vehicle and assessment of their impact on the choice of the operation mode of the traction drive control system.

  3. Social dumping

    DEFF Research Database (Denmark)

    Pedersen, Klaus

    2010-01-01

    bidrag til, at OK-2010 "landes" fredeligt, fordi aftalen giver fagforeningerne en væsentlig indrømmelse i indsatsen mod social dumping. Aftalen har rigtignok til formål at imødekomme et af fagbevægelsens centrale overenskomstkrav om nye redskaber i indsatsen mod "social dumping". Men hvad er det aftalen...

  4. Evaluation of a radar-based proximity warning system for off-highway dump trucks.

    Science.gov (United States)

    Ruff, Todd

    2006-01-01

    A radar-based proximity warning system was evaluated by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health to determine if the system would be effective in detecting objects in the blind spots of an off-highway dump truck. An average of five fatalities occur each year in surface mines as a result of an equipment operator not being aware of a smaller vehicle, person or change in terrain near the equipment. Sensor technology that can detect such obstacles and that also is designed for surface mining applications is rare. Researchers worked closely with the radar system manufacturer to test and modify the system on large, off-highway dump trucks at a surface mine over a period of 2 years. The final system was thoroughly evaluated by recording video images from a camera on the rear of the truck and by recording all alarms from the rear-mounted radar. Data show that the system reliably detected small vehicles, berms, people and other equipment. However, alarms from objects that posed no immediate danger were common, supporting the assertion that sensor-based systems for proximity warning should be used in combination with other devices, such as cameras, that would allow the operator to check the source of any alarm.

  5. Reclamation of landfills and dumps of municipal solid waste in a energy efficient waste management system: methodology and practice

    Science.gov (United States)

    Orlova, Tatyana; Melnichuk, Aleksandr; Klimenko, Kseniya; Vitvitskaya, Valentina; Popovych, Valentina; Dunaieva, Ielizaveta; Terleev, Vitaly; Nikonorov, Aleksandr; Togo, Issa; Volkova, Yulia; Mirschel, Wilfried; Garmanov, Vitaly

    2017-10-01

    The article considers the methodological and practical aspects of reclamation of landfills and dumps of municipal solid waste in a waste management system. The general tendencies of system development in the context of elements of the international concept of waste hierarchy are analyzed. Statistics of the formation and burial of domestic waste indicate a strategic non-alternative to the rejection of landfill technologies in favor of environmentally, energy efficient and economically expedient ways of utilization of municipal waste as a world trend. Practical approaches to the study of territories on which there are dumps and landfills are considered to justify the design solutions for reclamation.

  6. Electron beam processing system

    International Nuclear Information System (INIS)

    Kashiwagi, Masayuki

    2004-01-01

    Electron beam Processing Systems (EPS) are used as useful and powerful tools in many industrial application fields such as the production of cross-linked wire, rubber tire, heat shrinkable film and tubing, curing, degradation of polymers, sterilization and environmental application. In this paper, the feature and application fields, the selection of machine ratings and safety measures of EPS will be described. (author)

  7. ITER neutral beam system

    International Nuclear Information System (INIS)

    Mondino, P.L.; Di Pietro, E.; Bayetti, P.

    1999-01-01

    The Neutral Beam (NB) system for the International Thermonuclear Experimental Reactor (ITER) has reached a high degree of integration with the tokamak and with the rest of the plant. Operational requirements and maintainability have been considered in the design. The paper considers the integration with the tokamak, discusses design improvements which appear necessary and finally notes R and D progress in key areas. (author)

  8. Conceptual Design of the RHIC Dump Core

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, A. J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    1995-09-26

    Conceptually, the internal dump consists of a "core" whose purpose is to absorb the energy of the beam, and surrounding shielding whose purpose is to attenuate radiation. Design of the core for an internal dump has two problems which must be overcome. The first problem is preserving the integrity of the dump core. The bunches must be dispersed laterally an amount sufficient to keep the energy density from cracking the dump core material. Since the dump kickers in RHIC are only ~25m upstream of the entrance face of the dump, this is i a difficult problem. The second problem, not addressed in this note, is that dumping the beam should not quench downstream magnets. Preliminary calculations related to both of these problems have been presented in earlier notes.

  9. ITER neutral beam system US conceptual design

    International Nuclear Information System (INIS)

    Purgalis, P.

    1990-09-01

    In this document we present the US conceptual design of a neutral beam system for International Thermonuclear Experimental Reactor (ITER). The design incorporates a barium surface conversion D - source feeding a linear array of accelerator channels. The system uses a dc accelerator with electrostatic quadrupoles for strong focusing. A high voltage power supply that is integrated with the accelerator is presented as an attractive option. A gas neutralizer is used and residual ions exiting the neutralizer are deflected to water-cooled dumps. Cryopanels are located at the accelerator exit to pump excess gas from the source and the neutralizer, and in the ion dump cavity to pump re-neutralized ions and neutralizer gas. All the above components are packaged in compact identical, independent modules which can be removed for remote maintenance. The neutral beam system delivers 75 MW of DO at 1.3 MeV, into three ports with a total of 9 modules arranged in stacks of three modules per port . To increase reliability each module is designed to deliver up to 10 MW; this allows eight modules operating at partial capacity to deliver the required power in the event one module is out of service, and provides 20% excess capacity to improve availability. Radiation protection is provided by shielding and by locating critical components in the source and accelerator 46.5 m from the torus centerline. Neutron shielding in the drift duct and neutralizer provides the added feature of limiting conductance and thus reducing gas flow to and from the torus

  10. Beam loss monitor system for machine protection

    CERN Document Server

    Dehning, B

    2005-01-01

    Most beam loss monitoring systems are based on the detection of secondary shower particles which depose their energy in the accelerator equipment and finally also in the monitoring detector. To allow an efficient protection of the equipment, the likely loss locations have to be identified by tracking simulations or by using low intensity beams. If superconducting magnets are used for the beam guiding system, not only a damage protection is required but also quench preventions. The quench levels for high field magnets are several orders of magnitude below the damage levels. To keep the operational efficiency high under such circumstances, the calibration factor between the energy deposition in the coils and the energy deposition in the detectors has to be accurately known. To allow a reliable damage protection and quench prevention, the mean time between failures should be high. If in such failsafe system the number of monitors is numerous, the false dump probability has to be kept low to keep a high operation...

  11. Development of the TFTR neutral beam injection system

    International Nuclear Information System (INIS)

    Prichard, B.A. Jr.

    1977-01-01

    The TFTR Neutral Beam Lines are designed to inject 20 MW of 120 keV neutral deuterium atoms into the plasma. This is accomplished using 12 sources, 65 amperes each, mounted in 4 beam lines. The 120 kV sources and a prototype beam line are being developed. The implementation of these beam lines has required the development of several associated pieces of hardware. 200 kV switch tubes for the power supplies are being developed for modulation and regulation of the accelerating supplies. A 90 cm metallic seal gate valve capable of sealing against atmosphere in either direction is being developed for separating the torus and beam line vacuum systems. A 70 x 80 cm fast shutter valve is also being developed to limit tritium migration from the torus into the beam line. Internal to the beam line a calorimeter, ion dump and deflection magnet have been designed to handle three beams, and optical diagnostics utilizing the doppler broadening and doppler shift of light emitted from the accelerated beam are being developed. The control and monitoring of the 12 sources will be done via the TFTR computer control system (CICADA) as will other parts of the machine, and software is being developed to condition and operate the sources automatically. The prototype beam line is scheduled to begin operation in the fall of 1978 and all four production beam lines on TFTR in 1982

  12. The beam transport system

    International Nuclear Information System (INIS)

    1986-01-01

    The first proton beams have been transported along the transfer beamline and the diagnostic components have thus been used and tested under real operating conditions. The various electronic systems have been linked to the control system and the equipment can now be operated from the control console. The performance of the diagnostic system for the transfer beamline is satisfactory. The beam diagnostic components for the high-energy beamlines up to the isotope production and neutron therapy vaults and the first experimental target rooms have been installed. The high-energy slits have been delivered. The scanner and harp electronics have been installed and linked to their respective components in the beamlines. The pneumatic acuator control electronics has been manufactured, installed and is operational; provision has been made for special control features of the equipment in the therapy beamline. The high-voltage bias supply for the Faraday cups has been implemented. The installation of the beam current measurement system is nearing completion although part of it is already operational. A coaxial relay multiplexer for the capacitive phase probe signals has been manufactured and installed. The diagnostic equipment for the beamlines to isotope production and neutron therapy is thus ready for operation. 4 figs

  13. Observation of an excess of νe, νe events in a beam dump experiment at 400 GeV

    Directory of Open Access Journals (Sweden)

    P. Alibran

    1978-03-01

    Full Text Available A beam dump experiment has been performed at CERN in Gargamelle using the neutrino facility to look for penetrating particles produced either directly in the beam interaction or by prompt decay of new particles. A total of 32 interactions with a visible energy greater than 10 GeV has been found, classified, aftercorrections, into 18 charged current νμ or νμ, 5.1 neutral current and 8.9 νe or νe charged current events. An excess of νe events remains after all subtractions from any established sources. Results are presented in terms of the product of the cross section and the leptonic decay branching ratio of the possible source.

  14. Observation of an excess of nu$_{e}$, n$\\overline{u}_{e}$ events in a beam dump experiment at 400 GeV

    CERN Document Server

    Alibran, P; Arnold, R; Bartley, J H; Bellotti, E; Bertrand, D; Blaes, R; Blondel, A; Blum, D; Bolognese, T; Bonetti, S; Bonneaud, G R; Bourotte, J; Bullock, F W; Burmeister, H; Carnesecchi, G; Cavalli, D; Conforto, G; Degrange, B; Dewit, M; Erriquez, O; Escoubés, B; Fiorini, Ettore; Frodesen, A G; Gillespie, J; Haguenauer, Maurice; Heusse, P; Jacquet, F; Jones, T W; Lutz, A M; Matteuzzi, C; Morfín, J G; Muciaccia, M T; Musset, P; Natali, S; Nguyen-Khac, U; Nuzzo, S; Pascaud, C; Pattison, B; Paty, M; Petitjean, P; Price, M; Pullia, Antonio; Riester, J L; Rognebakke, A; Rollier, M; Romano, F; Sacton, J; Skjeggestad, O; Sleeman, J C; Van Doninck, W K; Vialle, J P; Weerts, H; Welch, L; Willutzky, M; Zanotti, L

    1978-01-01

    A beam dump experiment has been performed at CERN in Gargammelle using the neutrino facility to look for penetrating particles produced either directly in the beam interaction or by prompt decay of new particles. A total of 32 interactions with a visible energy greater than 10 GeV has been found, classified, after corrections, into 18 charged current nu /sub mu / or nu /sub mu /, 5.1 neutral current and 8.9 nu /sub e/ or nu /sub e/ charged current events. An excess of nu /sub e/ events remains after all subtractions from any established sources. Results are presented in terms of the product of the cross section and the leptonic decay branching ratio of the possible source. (11 refs).

  15. High heat flux engineering for the upgraded neutral beam injection systems of MAST-U

    International Nuclear Information System (INIS)

    Dhalla, F.; Mistry, S.; Turner, I.; Barrett, T.R.; Day, I.; McAdams, R.

    2015-01-01

    Highlights: • A new Residual Ion Dump (RID) and bend magnet system for the upgraded NBI systems have been designed for the 5 s MAST-U pulse requirements. • Design scoping was performed using numerical ion-tracing analysis software (MAGNET and OPERA codes). • A more powerful bending magnet will separate the residual ions into full, half and third energy components. • Three separate CuCrZr dumps spread the power loading resulting in acceptable power footprints. • FE thermo-mechanical analyses using ANSYS to validate the designs against the ITER SDC-IC code. • New bend magnet coils, yoke and CuCrZr water-cooled plates are in the procurement phase. - Abstract: For the initial phase of MAST-U operation the two existing neutral beam injection systems will be used, but must be substantially upgraded to fulfil expected operational requirements. The major elements are the design, manufacture and installation of a bespoke bending magnet and Residual Ion Dump (RID) system. The MAST-design full energy dump is being replaced with new actively-cooled full, half and third energy dumps, designed to receive 2.4 MW of ion power deflected by an iron-cored electromagnet. The main design challenge is limited space available in the vacuum vessel, requiring ion-deflection calculations to ensure acceptable heat flux distribution on the dump panels. This paper presents engineering and physics analysis of the upgraded MAST beamlines and reports the current status of manufacture.

  16. Slow beam raster system at CEBAF

    International Nuclear Information System (INIS)

    Yan, C.; Beaufait, J.; Carlini, R.; Cuevas, C.; Vulcan, W.; Wines, R.

    1994-01-01

    A bedstead air-core raster magnet is being installed now, it will be used at CEBAF to scan the beam on the Hall C polarized target and the beam dump with fixed frequency 60 Hz in horizontal, 103.4 Hz in vertical. The x and y raster magnets are driven by Variac transformer and SUMIT-OMO inverter respectively. Both of them provide an approximate sine current waveform with peak current 20 A, corresponding to a maximum deflection angle 1 mr

  17. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  18. Radiation and shielding around beam absorbers

    International Nuclear Information System (INIS)

    Hurkmans, A.; Maas, R.

    1978-12-01

    During operational conditions it is anticipated that a fair amount of the total available beam power is dumped in either the slit system on one of the beam dumps. Thses beam absorbers therefore become strong radioactive sources. The radiation level due to the absorption of a 100 kW electron beam is estimated and the problem of residual activity is treated. Proposed shielding materials are discussed. (C.F.)

  19. Ocean Dumping Control Regulations

    International Nuclear Information System (INIS)

    1978-01-01

    These Regulations were made further to the Ocean Dumping Control Act which provides for restrictions in dumping operations. The Regulations contain model applications for permits to dump or load a series of materials. (NEA)

  20. Dumping Low and High Resolution Graphics on the Apple IIe Microcomputer System.

    Science.gov (United States)

    Fletcher, Richard K., Jr.; Ruckman, Frank, Jr.

    This paper discusses and outlines procedures for obtaining a hard copy of the graphic output of a microcomputer or "dumping a graphic" using the Apple Dot Matrix Printer with the Apple Parallel Interface Card, and the Imagewriter Printer with the Apple Super Serial Interface Card. Hardware configurations and instructions for high…

  1. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  2. A magnetized Einzel lens electron dump for the Linac4 H− ion source

    CERN Document Server

    Midttun, O; Kronberger, M; Lettry, J; Pereira, H; Scrivens, R

    2013-01-01

    Linac4 is a 160 MeV linear accelerator which will inject negative hydrogen ions (H−) into CERN’s Proton Synchrotron Booster, a required upgrade to improve the beam brightness in the LHC injector chain. A volume production RF ion source, based on the design of the DESY RF source was implemented, but showed considerable electron dump ablation during operation at 45 keV beam energy. To reduce the electron beam power density in the dump, a magnetized Einzel lens is designed that reduces the beam energy to 10 keV before permanentmagnets dump the electrons on a tungsten surface. Presented in this paper are simulations of the design using IBSimu, the tunable range of parameters depending on the extracted H− and electron current, as well as details of the implementation, the choice of pulsed power converters and the electrode alignment system. In addition, simulations of proton extraction from this source will be shown.

  3. Beam based systems and controls

    CERN Document Server

    Jacquet, D

    2012-01-01

    This presentation will give a review from the operations team of the performance and issues of the beam based systems, namely RF, ADT, beam instrumentation, controls and injection systems. For each of these systems, statistics on performance and availability will be presented with the main issues encountered in 2012. The possible improvements for operational efficiency and safety will be discussed, with an attempt to answer the question "Are we ready for the new challenges brought by the 25ns beam and increased energy after LSI? ".

  4. Neutral particle beam alternative concept for ITER

    International Nuclear Information System (INIS)

    Sedgley, D.; Brook, J.; Luzzi, T.; Deutsch, L.

    1989-01-01

    An analysis of an ITER neutral particle beam system is presented. The analysis covers the neutralizer, ion dumps, pumping, and geometric aspects. The US beam concept for ITER consists of three or four clusters of beamlines delivering approximately 80 MW total of 1.6-MeV deuterium to three or four reactor ports. Each cluster has three self-contained beamlines featuring plasma neutralizers and electrostatic ion dumps. In this study, each of the beamlines has two source assemblies with separate gas neutralizers and magnetic ion dumps. Deuterium is injected into the gas neutralizers by a separate system. Saddle-shaped copper coils augment the tokamak poloidal field to turn the charged particles into the ion dumps. The gas flow from the source, neutralizer, and ion dump is pumped by regenerable cryopanels. The effect of the port between the TF coils and the beam injection angle on the plasma footprint was studied

  5. Review of the abort dump shown in the SSC [superconducting super collider] conceptual design report

    International Nuclear Information System (INIS)

    Cossairt, J.D.

    1987-04-01

    This report details the design of the abort dump for the Superconducting Super-Collider (SSC). The dump is made from graphite and designed to absorb the maximum beam energy of 400 MJ. The report considers long time activation effects of the dump components. The report concludes that the basic design of the abort dump is well defined

  6. Beam Cleaning and Collimation Systems

    CERN Document Server

    Redaelli, S

    2016-01-01

    Collimation systems in particle accelerators are designed to dispose of unavoidable losses safely and efficiently during beam operation. Different roles are required for different types of accelerator. The present state of the art in beam collimation is exemplified in high-intensity, high-energy superconducting hadron colliders, like the CERN Large Hadron Collider (LHC), where stored beam energies reach levels up to several orders of magnitude higher than the tiny energies required to quench cold magnets. Collimation systems are essential systems for the daily operation of these modern machines. In this document, the design of a multistage collimation system is reviewed, taking the LHC as an example case study. In this case, unprecedented cleaning performance has been achieved, together with a system complexity comparable to no other accelerator. Aspects related to collimator design and operational challenges of large collimation systems are also addressed.

  7. ITER Neutral Beam Injection System

    International Nuclear Information System (INIS)

    Ohara, Yoshihiro; Tanaka, Shigeru; Akiba, Masato

    1991-03-01

    A Japanese design proposal of the ITER Neutral Beam Injection System (NBS) which is consistent with the ITER common design requirements is described. The injection system is required to deliver a neutral deuterium beam of 75MW at 1.3MeV to the reactor plasma and utilized not only for plasma heating but also for current drive and current profile control. The injection system is composed of 9 modules, each of which is designed so as to inject a 1.3MeV, 10MW neutral beam. The most important point in the design is that the injection system is based on the utilization of a cesium-seeded volume negative ion source which can produce an intense negative ion beam with high current density at a low source operating pressure. The design value of the source is based on the experimental values achieved at JAERI. The utilization of the cesium-seeded volume source is essential to the design of an efficient and compact neutral beam injection system which satisfies the ITER common design requirements. The critical components to realize this design are the 1.3MeV, 17A electrostatic accelerator and the high voltage DC acceleration power supply, whose performances must be demonstrated prior to the construction of ITER NBI system. (author)

  8. International Thermonuclear Experimental Reactor (ITER) neutral beam design

    International Nuclear Information System (INIS)

    Myers, T.J.; Brook, J.W.; Spampinato, P.T.; Mueller, J.P.; Luzzi, T.E.; Sedgley, D.W.

    1990-10-01

    This report discusses the following topics on ITER neutral beam design: ion dump; neutralizer and module gas flow analysis; vacuum system; cryogenic system; maintainability; power distribution; and system cost

  9. First operational experience with the LHC machine protection system when operating with beam energies beyond the 100MJ range

    CERN Document Server

    Assmann, R; Ferro-Luzzi, M; Goddard, B; Lamont, M; Schmidt, R; Siemko, A; Uythoven, J; Wenninger, J; Zerlauth, M

    2012-01-01

    The Large Hadron Collider (LHC) at CERN has made remarkable progress during 2011, surpassing its ambitious goal for the year in terms of luminosity delivered to the LHC experiments. This achievement was made possible by a progressive increase of beam intensities by more than 5 orders of magnitude during the first months of operation, reaching stored beam energies beyond the 100MJ range at the end of the year, less than a factor of 4 from the nominal design value. The correct functioning of the machine protection systems is vital during the different operational phases, for initial operation and even more when approaching nominal beam parameters where already a small fraction of the stored energy is sufficient to damage accelerator equipment or experiments in case of uncontrolled beam loss. Safe operation of the machine in presence of such high intensity proton beams is guaranteed by the interplay of many different systems: beam dumping system, beam interlocks, beam instrumentation, equipment monitoring, colli...

  10. PLT neutral beam injection systems

    International Nuclear Information System (INIS)

    Menon, M.M.; Barber, G.C.; Blue, C.W.

    1979-01-01

    A brief description of the Princeton Large Torus (PLT) neutral beam injection system is given and its performance characteristics are outlined. A detailed operational procedure is included, as are some tips on troubleshooting. Proper operation of the source is shown to be a crucial factor in system performance

  11. Antiproton source beam position system

    International Nuclear Information System (INIS)

    Bagwell, T.; Holmes, S.; McCarthy, J.; Webber, R.

    1984-05-01

    The TeV I Beam Position Monitor (BPM) system is designed to provide a useful diagnostic tool during the commissioning and operational phases of the antiproton source. Simply stated the design goal is to provide single turn position information for intensities of > 1x10 9 particles, and multi-turn (clocked orbit) information for beam intensities of > 1x10 7 particles, both with sub-millimeter resolution. It is anticipated that the system will be used during commissioning for establishing the first turn through the Debuncher and Accumulator, for aligning injection orbits, for providing information necessary to correct closed orbits, and for measuring various machine parameters (e.g. tunes, dispersion, aperture, chromaticity). During normal antiproton operation the system will be used to monitor the beam position throughout the accumulation process

  12. Reliability of Beam Loss Monitors System for the Large Hadron Collider

    CERN Document Server

    Guaglio, Gianluca; Santoni, C

    2004-01-01

    The employment of superconducting magnets, in the high energies colliders, opens challenging failure scenarios and brings new criticalities for the whole system protection. For the LHC beam loss protection system, the failure rate and the availability requirements have been evaluated using the Safety Integrity Level (SIL) approach. A downtime cost evaluation is used as input for the SIL approach. The most critical systems, which contribute to the final SIL value, are the dump system, the interlock system, the beam loss monitors system and the energy monitor system. The Beam Loss Monitors System (BLMS) is critical for short and intense particles losses, while at medium and higher loss time it is assisted by other systems, such as the quench protection system and the cryogenic system. For BLMS, hardware and software have been evaluated in detail. The reliability input figures have been collected using historical data from the SPS, using temperature and radiation damage experimental data as well as using standar...

  13. Performance Studies for Protection Against Asynchronous Dumps in the LHC

    CERN Document Server

    Kramer, T; Bracco, C; Goddard, B; Meddahi, M

    2010-01-01

    The LHC beam dump system has to safely dispose all beams in a wide energy range of 450 GeV to 7 TeV. A 3 ms abort gap in the beam structure for the switch-on of the extraction kicker field ideally allows a loss-free extraction under normal operating conditions. However, a low number of asynchronous beam aborts is to be expected from reliability calculations and from the first year's operational experience with the beam dump kickers. For such cases, MAD-X simulations including all optics and alignment errors have been performed to determine loss patterns around the LHC as a function of the position of the main protection elements in interaction region six. Special attention was paid to the beam load on the tungsten collimators which protect the triplets in the LHC experimental insertions, and the tracking results compared with semi-analytical numerical estimates. The simulations are also compared to the results of beam commissioning of these protection devices.

  14. Computer system for the beam line data processing at JT-60 prototype neutral beam injector

    International Nuclear Information System (INIS)

    Horiike, Hiroshi; Kawai, Mikito; Ohara, Yoshihiro

    1987-08-01

    The present report describes the hard and soft wares of the data acquisition computer system for the prototype neutral injector unit for JT-60. In order to operate the unit, more than hundreds of signals of the beam line components have to be measured. These are mainly differential thermometers for the coolant waters and thermocouples for the beam dump components but not include those for the cryo system. Since the unit operates in a series of pulses, the measurement should be conducted very quickly in order to ensure the simultaneity of large number of the measured data. The present system actualize fast data acquisition using a small computer of 128 kB and measuring instruments connected through the bus. The system is connected to the JAERI computer center since the data capacity is fairly large to completely process them by the small computer. Therefore the measured data can be transferred to the computer center to calculate there, and the results can be received. After the system was completed the computer quickly print out the power flow data, which needed much work to calculate with hands. This system was very useful. It enhanced the experiments at the unit and reduced the labor. It enables us to early demonstrate the rated operation of the unit and to accurately estimate such operation data of the JT-60 NBI as the injection power. (author)

  15. High efficiency and good beam quality of electro-optic, cavity-dumped and double-end pumped Nd:YLF laser

    Science.gov (United States)

    Tang, X. X.; Fan, Z. W.; Qiu, J. S.; Lian, F. Q.; Zhang, X. L.

    2012-06-01

    In this paper, we describe a Nd:YLF laser based on high-speed RTP electro-optical cavity dumping technique. Two home-made 150 W fiber pump modules are used from both sides to pump Nd:YLF crystal. Coupling systems are the key elements in end-pumped solid-state lasers, the aberrations of which greatly affect the efficiency of the lasers. In order to get high efficient and good quality laser output, the optical software ZEMAX is used to design a four-piece coupling system. When the pumped energy is 32 mJ at the repetition rate of 1 Hz, the output energy is 6.5 mJ with 2.5 ns pulse width. When the pumped energy is 13.1 W at the repetition rate of 200 Hz, the output energy is 2.2 W with small M 2 factor where M {/x 2} is 1.04, and M {/y 2} is 1.05, and the light-light conversion efficiency is up to 16.8%.

  16. Bevalac beam transport system

    International Nuclear Information System (INIS)

    Avery, R.; Behrsing, G.; Morgado, R.; Rondeau, D.; Salsig, W.; Selph, F.; Staples, J.; Yourd, R.

    1975-03-01

    The Bevalac consists of, in part, a 200 meter long transfer line between the SuperHILAC and the Bevatron, which are at differing elevation. Unique features in the construction of the transfer line are described. The line, located largely outside, must cope with a natural environment. Part of the line passes through a hillside, requiring some unique support and alignment techniques. The dipoles are of the tape-wound variety and the steering magnets use printed circuit conductors. The vacuum system and an inexpensive and effective destructive monitoring system are described. (U.S.)

  17. Performance of the KTeV high-energy neutral kaon beam at Fermilab

    International Nuclear Information System (INIS)

    Bocean, V.

    1998-01-01

    The performance of the primary and secondary beams for the KTeV experiments E832 and E799-II is reviewed. The beam was commissioned in the summer of 1996 and initially operated for approximately one year. The report includes results on the primary beam, target station including primary beam dump and muon sweeping system, neutral beam collimation system, and alignment

  18. TFTR neutral beam power system

    International Nuclear Information System (INIS)

    Deitz, A.; Murray, H.; Winje, R.

    1977-01-01

    The TFTR NB System will be composed of four beam lines, each containing three ion sources presently being developed for TFTR by the Lawrence Berkeley Laboratories (LBL). The Neutral Beam Power System (NBPS) will provide the necessary power required to operate these Ion Sources in both an experimental or operational mode as well as test mode. This paper describes the technical as well as the administrative/management aspects involved in the development and building of this system. The NBPS will combine the aspects of HV pulse (120 kV) and long pulse width (0.5 sec) together to produce a high power system that is unique in the Electrical Engineering field

  19. Conceptual design of a calorimeter and residual ion dump for the ITER negative ion injectors

    International Nuclear Information System (INIS)

    Watson, M.

    1998-01-01

    A conceptual design for the ITER Negative Ion Injectors' Calorimeter and Residual Ion Dump systems has been carried out. The work was undertaken in support of detailed studies performed by the Russian Federation. Concepts for both systems incorporate actively water cooled hypervapotrons as the primary beam stopping elements. The Calorimeter drive has been based on the utilisation of a novel force translation system via magnetic coupling. The Residual Ion Dump necessitates the use of double sided hypervapotron elements in order to cater for the restricted space envelope defined by the Accelerator Grid hole pattern. (author)

  20. Proton beam therapy control system

    Science.gov (United States)

    Baumann, Michael A [Riverside, CA; Beloussov, Alexandre V [Bernardino, CA; Bakir, Julide [Alta Loma, CA; Armon, Deganit [Redlands, CA; Olsen, Howard B [Colton, CA; Salem, Dana [Riverside, CA

    2008-07-08

    A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

  1. H- beam neutralization measurements in a solenoidal beam transport system

    International Nuclear Information System (INIS)

    Sherman, J.; Pitcher, E.; Stevens, R.; Allison, P.

    1992-01-01

    H minus beam space-charge neutralization is measured for 65-mA, 35-keV beams extracted from a circular-aperture Penning surface-plasma source, the small-angle source. The H minus beam is transported to a RFQ matchpoint by a two-solenoid magnet system. Beam noise is typically ±4%. A four-grid analyzer is located in a magnetic-field-free region between the two solenoid magnets. H minus potentials are deduced from kinetic energy measurements of particles (electrons and positive ions) ejected radially from the beam channel by using a griddled energy analyzer. Background neutral gas density is increased by the introduction of additional Xe and Ar gases, enabling the H minus beam to become overneutralized

  2. Assessment of the governance system for the management of the East Sea-Jung dumping site, Korea through analysis of heavy metal concentrations in bottom sediments

    Science.gov (United States)

    Song, Ki-Hoon; Choi, Ki-Young; Kim, Chang-Joon; Kim, Young-Il; Chung, Chang-Soo

    2015-12-01

    sediments. As a result, this site can be considered as uncontaminated or slightly contaminated. This implies that the efforts made by the Korea government to manage and govern the dumping site through various policies, including `the focal point system', `the responsibility zones system' and `the principle of pollution causing party liability', have been successful.

  3. Optimal allocation and sizing of PV/Wind/Split-diesel/Battery hybrid energy system for minimizing life cycle cost, carbon emission and dump energy of remote residential building

    International Nuclear Information System (INIS)

    Ogunjuyigbe, A.S.O.; Ayodele, T.R.; Akinola, O.A.

    2016-01-01

    Highlights: • Genetic Algorithm is used for tri-objective design of hybrid energy system. • The objective is minimizing the Life Cycle Cost, CO_2 emissions and dump energy. • Small split diesel generators are used in place of big single diesel generator. • The split diesel generators are aggregable based on certain set of rules. • The proposed algorithm achieves the set objectives (LCC, CO_2 emission and dump). - Abstract: In this paper, a Genetic Algorithm (GA) is utilized to implement a tri-objective design of a grid independent PV/Wind/Split-diesel/Battery hybrid energy system for a typical residential building with the objective of minimizing the Life Cycle Cost (LCC), CO_2 emissions and dump energy. To achieve some of these objectives, small split Diesel generators are used in place of single big Diesel generator and are aggregable based on certain set of rules depending on available renewable energy resources and state of charge of the battery. The algorithm was utilized to study five scenarios (PV/Battery, Wind/Battery, Single big Diesel generator, aggregable 3-split Diesel generators, PV/Wind/Split-diesel/Battery) for a typical load profile of a residential house using typical wind and solar radiation data. The results obtained revealed that the PV/Wind/Split-diesel/Battery is the most attractive scenario (optimal) having LCC of $11,273, COE of 0.13 ($/kW h), net dump energy of 3 MW h, and net CO_2 emission of 13,273 kg. It offers 46%, 28%, 82% and 94% reduction in LCC, COE, CO_2 emission and dump energy respectively when compared to a single big Diesel generator scenario.

  4. Evaluation of a fast PLC module in prospect of the LHC beam interlock system

    CERN Document Server

    Zaera-Sanz, Manuel

    2005-01-01

    The LHC Beam Interlock system requires a controller performing a simple matrix function to collect the different beam dump requests. To satisfy the expected safety level of the Interlock, the system should be robust and reliable. The PLC is a promising candidate to fulfil both aspects but too slow to meet the expected response time which is of the order of mseconds. Siemens has introduced a “so called” fast module (FM352-5 Boolean Processor) that provides independent and extremely fast control of a process within a larger control system using an onboard processor, a Field Programmable Gate Array (FPGA), to execute code in parallel which results in extremely fast scan times. It is interesting to investigate its features and to evaluate it as a possible candidate for the beam interlock system. This note publishes the results of this study. As well, this note could be useful for other applications requiring fast processing using a PLC.

  5. The design, fabrication and operation of the mechanical systems for the Neutral Beam Engineering Test Facility

    International Nuclear Information System (INIS)

    Patterson, J.A.; Fong, M.; Koehler, G.W.; Low, W.; Purgalis, P.; Wells, R.P.

    1983-01-01

    The Neutral Beam Engineering Test Facility (NBETF) at the Lawrence Berkeley Laboratory (LBL) is a National Test Facility used to develop long pulse Neutral Beam Sources. The Facility will test sources up to 120 keV, 50 A, with 30 s beam-on times with a 10% duty factor. For this application, an actively cooled beam dump is required and one has been constructed capable of dissipating a wide range of power density profiles. The flexibility of the design is achieved by utilizing a standard modular panel design which is incorporated into a moveable support structure comprised of eight separately controllable manipulator assemblies. The thermal hydraulic design of the panels permits the dissipation of 2 kW/cm 2 anywhere on the panel surface. The cooling water requirements of the actively cooled dump system are provided by the closed loop Primary High Pressure Cooling Water System. To minimize the operating costs of continuously running this high power system, a variable speed hydraulic drive is used for the main pump. During beam pulses, the pump rotates at high speed, then cycles to low speed upon completion of the beam shot. A unique neutralizer design has been installed into the NBETF beamline. This is a gun-drilled moveable brazed assembly which provides continuous armoring of the beamline near the source. The unit penetrates the source mounting valve during operation and retracts to permit the valve to close as needed. The beamline also has an inertially cooled duct calorimeter assembly. This assembly is a moveable hinged matrix of copper plates that can be used as a beam stop up to pulse lengths of 50 ms. The beamline is also equipped with many beam scraper plates of differing detail design and dissipation capabilities

  6. Antares automatic beam alignment system

    International Nuclear Information System (INIS)

    Appert, Q.; Swann, T.; Sweatt, W.; Saxman, A.

    1980-01-01

    Antares is a 24-beam-line CO 2 laser system for controlled fusion research, under construction at Los Alamos Scientific Laboratory (LASL). Rapid automatic alignment of this system is required prior to each experiment shot. The alignment requirements, operational constraints, and a developed prototype system are discussed. A visible-wavelength alignment technique is employed that uses a telescope/TV system to view point light sources appropriately located down the beamline. Auto-alignment is accomplished by means of a video centroid tracker, which determines the off-axis error of the point sources. The error is nulled by computer-driven, movable mirrors in a closed-loop system. The light sources are fiber-optic terminations located at key points in the optics path, primarily at the center of large copper mirrors, and remotely illuminated to reduce heating effects

  7. Ocean Dumping Control Act

    International Nuclear Information System (INIS)

    1975-01-01

    This Act provides for the control of dumping of wastes and other substances in the ocean in accordance with the London Convention of 1972 on Prevention of Marine Pollution by the Dumping of Wastes and other Matter to which Canada is a Party. Radioactive wastes are included in the prohibited and restricted substances. (NEA)

  8. Reliability of Beam Loss Monitor Systems for the Large Hadron Collider

    International Nuclear Information System (INIS)

    Guaglio, G.; Dehning, B.; Santoni, C.

    2005-01-01

    The increase of beam energy and beam intensity, together with the use of super conducting magnets, opens new failure scenarios and brings new criticalities for the whole accelerator protection system. For the LHC beam loss protection system, the failure rate and the availability requirements have been evaluated using the Safety Integrity Level (SIL) approach. A downtime cost evaluation is used as input for the SIL approach. The most critical systems, which contribute to the final SIL value, are the dump system, the interlock system, the beam loss monitors system, and the energy monitor system. The Beam Loss Monitors System (BLMS) is critical for short and intense particles losses at 7 TeV and assisted by the Fast Beam Current Decay Monitors at 450 GeV. At medium and higher loss time it is assisted by other systems, such as the quench protection system and the cryogenic system. For BLMS, hardware and software have been evaluated in detail. The reliability input figures have been collected using historical data from the SPS, using temperature and radiation damage experimental data as well as using standard databases. All the data has been processed by reliability software (Isograph). The analysis spaces from the components data to the system configuration

  9. Reliability of Beam Loss Monitor Systems for the Large Hadron Collider

    Science.gov (United States)

    Guaglio, G.; Dehning, B.; Santoni, C.

    2005-06-01

    The increase of beam energy and beam intensity, together with the use of super conducting magnets, opens new failure scenarios and brings new criticalities for the whole accelerator protection system. For the LHC beam loss protection system, the failure rate and the availability requirements have been evaluated using the Safety Integrity Level (SIL) approach. A downtime cost evaluation is used as input for the SIL approach. The most critical systems, which contribute to the final SIL value, are the dump system, the interlock system, the beam loss monitors system, and the energy monitor system. The Beam Loss Monitors System (BLMS) is critical for short and intense particles losses at 7 TeV and assisted by the Fast Beam Current Decay Monitors at 450 GeV. At medium and higher loss time it is assisted by other systems, such as the quench protection system and the cryogenic system. For BLMS, hardware and software have been evaluated in detail. The reliability input figures have been collected using historical data from the SPS, using temperature and radiation damage experimental data as well as using standard databases. All the data has been processed by reliability software (Isograph). The analysis spaces from the components data to the system configuration.

  10. Reliability of Beam Loss Monitor Systems for the Large Hadron Collider

    CERN Document Server

    Guaglio, Gianluca; Santoni, C

    2005-01-01

    The increase of beam energy and beam intensity, together with the use of super conducting magnets, opens new failure scenarios and brings new criticalities for the whole accelerator protection system. For the LHC beam loss protection system, the failure rate and the availability requirements have been evaluated using the Safety Integrity Level (SIL) approach. A downtime cost evaluation is used as input for the SIL approach. The most critical systems, which contribute to the final SIL value, are the dump system, the interlock system, the beam loss monitors system, and the energy monitor system. The Beam Loss Monitors System (BLMS) is critical for short and intense particles losses at 7 TeV and assisted by the Fast Beam Current Decay Monitors at 450 GeV. At medium and higher loss time it is assisted by other systems, such as the quench protection system and the cryogenic system. For BLMS, hardware and software have been evaluated in detail. The reliability input figures have been collected using historical data...

  11. Reliability study of the Controls Interlocks Beam Dumping System CIBDS V5

    CERN Document Server

    Blumenschein, Miriam Ruth

    2017-01-01

    The CIBDS V5 reliability study includes a failure mode and effect analysis, a failure rate prediction and a fault tree analysis. The different steps of these analyses, the assumptions as well as the results are summarised in this note.

  12. Installation And Test Of Electron Beam Generation System To Produce Far-Infrared Radiation And X-Ray Pulses

    International Nuclear Information System (INIS)

    Wichaisirimongkol, Pathom; Jinamoon, Witoon; Khangrang, Nopadon; Kusoljariyakul, Keerati; Rhodes, Michael W.; Rimjaem, Sakhorn; Saisut, Jatuporn; Chitrlada, Thongbai; Vilaithong, Thiraphat; Wiedemann, Helmut

    2005-10-01

    SURIYA project at the Fast Neutron Research Facility, Chiang Mai University, aims to establish a facility to generate femtosecond electron beams. This electron beam can be used to generate high intensity far-infrared radiation and ultra-short X-ray pulses. The main components of the system are a 3 MeV RF electron gun with a thermionic cathode, an a-magnet as a bunch compressor, and post acceleration 15-20 MeV by a linear accelerator (linac). Between the main components, there are focusing quadrupole magnets and steering magnets to maintain the electron beam within a high vacuum tube. At the end of the beam transport line, a dipole magnet has been installed to function as a beam dump and an energy spectrometer. After the installation and testing of individual major components were completed, we have been investigating the generation of the electron beam, intense far- infrared radiation and ultra short X-ray pulses

  13. Integrated control system for electron beam processes

    Science.gov (United States)

    Koleva, L.; Koleva, E.; Batchkova, I.; Mladenov, G.

    2018-03-01

    The ISO/IEC 62264 standard is widely used for integration of the business systems of a manufacturer with the corresponding manufacturing control systems based on hierarchical equipment models, functional data and manufacturing operations activity models. In order to achieve the integration of control systems, formal object communication models must be developed, together with manufacturing operations activity models, which coordinate the integration between different levels of control. In this article, the development of integrated control system for electron beam welding process is presented as part of a fully integrated control system of an electron beam plant, including also other additional processes: surface modification, electron beam evaporation, selective melting and electron beam diagnostics.

  14. Ocean Dumping: International Treaties

    Science.gov (United States)

    The London Convention and London Protocol are global treaties to protect the marine environment from pollution caused by the ocean dumping of wastes. The Marine, Protection, Research and Sanctuaries Act implements the requirements of the LC.

  15. Surface sealing systems for dumps and old waste sites. Oberflaechenabdichtungssysteme fuer Deponien und Altlasten

    Energy Technology Data Exchange (ETDEWEB)

    Egloffstein, T [ed.; ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH, Karlsruhe (Germany); Burkhardt, G [ed.; ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH, Karlsruhe (Germany)

    1994-01-01

    The primary task of surface lining is to prevent rainwater from seeping into the wastes deposited below the surface. Its function is therefore to seal the surface. Above the sealing layer there is a drainage system; if large amount of gas are generated (domestic wastes) the gas is channeled through a gas drainage layer. The top layer of the system serves as recultivation horizon for plants. The functions of the liner are: - sealing against precipitating water; - channeling off gas or - seepage water; - plant site. (orig./EF)

  16. Beam monitoring system for intense neutron source

    International Nuclear Information System (INIS)

    Tron, A.M.

    2001-01-01

    Monitoring system realizing novel principle of operation and allowing to register a two-dimensional beam current distribution within entire aperture (100...200 mm) of ion pipe for a time in nanosecond range has been designed and accomplished for beam control of the INR intense neutron source, for preventing thermo-mechanical damage of its first wall. Key unit of the system is monitor of two-dimensional beam current distribution, elements of which are high resistant to heating by the beam and to radiation off the source. The description of the system and monitor are presented. Implementation of the system for the future sources with more high intensities are discussed. (author)

  17. Neutral beam program

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The structure of the beam injection program for the Doublet-3 device is discussed. The design considerations for the beam line and design parameters for the Doublet-3 ion souce are given. Major components of the neutral beam injector system are discussed in detail. These include the neutralizer, magnetic shielding, reflecting magnets, vacuum system, calorimeter and beam dumps, and drift duct. The planned location of the two-injector system for Doublet-3 is illustrated and site preparation is considered. The status of beamline units 1 and 2 and the future program schedule are discussed

  18. Design and R and D for manufacturing the MITICA Neutraliser and Electron Dump

    Energy Technology Data Exchange (ETDEWEB)

    Dalla Palma, Mauro, E-mail: mauro.dallapalma@igi.cnr.it [Consorzio RFX, Associazione Euratom-ENEA sulla Fusione, Padova (Italy); Sartori, Emanuele; Gonzalez, Winder [Università degli Studi di Padova, Padova (Italy); Tiso, Andrea; Trevisan, Lauro; Zaccaria, Pierluigi [Consorzio RFX, Associazione Euratom-ENEA sulla Fusione, Padova (Italy)

    2013-10-15

    Highlights: ► Analyses and verifications supporting the design of the MITICA Neutraliser and Electron Dump. ► Instrumentation and control systems have been analysed for protection, calorimetry, interlock. ► Assembly procedure, acceptance tests, and RH compatibility have been verified. ► R and D activities for design validation are ongoing to demonstrate the technical feasibility. -- Abstract: One MeV negative particle beam accelerated in the beam source of the ITER Neutral Beam Injectors (NBIs) will be neutralised in the Neutraliser gas cell. Four narrow beam channels are foreseen in the Neutraliser where the neutralisation process will occur with controlled gas pressure being the four channels delimited by five copper wall panels. Stray particles will be dumped on the copper Electron Dump and CuCrZr leading edges to be installed at the Neutraliser frontal section: the Electron Dump will intercept stray electrons in order to reduce the cryo pump thermal load; enhanced heat transfer in subcooled boiling conditions will occur in the panel leading edges with twisted tapes as turbulence promoters. The copper panels will be thermally controlled by means of embedded cooling circuits; thermo-hydraulic and thermo-mechanical analyses and verifications have been carried out considering several load combinations and satisfying the design rules as for ITER structural design criteria for in vessel components. Gas flow analyses have been carried out with molecular flow in the in-vessel vacuum environment to evaluate the gas pressure profile along the beam line also considering the presence of the Electron Dump. Furthermore, transient analyses of the gas flow inside channels have been performed to simulate the effect of last valve closure; analysis results demonstrate that gas flow variations can be detected by thermal measurements. The Neutraliser assembly, installation, and positioning inside the vacuum vessel have been verified considering alignment requirements and

  19. Improvement of Galilean refractive beam shaping system for accurately generating near-diffraction-limited flattop beam with arbitrary beam size.

    Science.gov (United States)

    Ma, Haotong; Liu, Zejin; Jiang, Pengzhi; Xu, Xiaojun; Du, Shaojun

    2011-07-04

    We propose and demonstrate the improvement of conventional Galilean refractive beam shaping system for accurately generating near-diffraction-limited flattop beam with arbitrary beam size. Based on the detailed study of the refractive beam shaping system, we found that the conventional Galilean beam shaper can only work well for the magnifying beam shaping. Taking the transformation of input beam with Gaussian irradiance distribution into target beam with high order Fermi-Dirac flattop profile as an example, the shaper can only work well at the condition that the size of input and target beam meets R(0) ≥ 1.3 w(0). For the improvement, the shaper is regarded as the combination of magnifying and demagnifying beam shaping system. The surface and phase distributions of the improved Galilean beam shaping system are derived based on Geometric and Fourier Optics. By using the improved Galilean beam shaper, the accurate transformation of input beam with Gaussian irradiance distribution into target beam with flattop irradiance distribution is realized. The irradiance distribution of the output beam is coincident with that of the target beam and the corresponding phase distribution is maintained. The propagation performance of the output beam is greatly improved. Studies of the influences of beam size and beam order on the improved Galilean beam shaping system show that restriction of beam size has been greatly reduced. This improvement can also be used to redistribute the input beam with complicated irradiance distribution into output beam with complicated irradiance distribution.

  20. High-Energy Beam Transport system

    International Nuclear Information System (INIS)

    Melson, K.E.; Farrell, J.A.; Liska, D.J.

    1979-01-01

    The High-Energy Beam Transport (HEBT) system for the Fusion Materials Irradiation Test (FMIT) Facility is to be installed at the Hanford Engineering Development Laboratory (HEDL) at Richland, Washington. The linear accelerator must transport a large emittance, high-current, high-power, continuous-duty deuteron beam with a large energy spread either to a lithium target or a beam stop. A periodic quadrupole and bending-magnet system provides the beam transport and focusing on target with small beam aberrations. A special rf cavity distributes the energy in the beam so that the Bragg Peak is distributed within the lithium target. Operation of the rf control system, the Energy Dispersion Cavity (EDC), and the beam transport magnets is tested on the beam stop during accelerator turn-on. Characterizing the beam will require extensions of beam diagnostic techniques and noninterceptive sensors. Provisions are being made in the facility for suspending the transport system from overhead supports using a cluster system to simplify maintenance and alignment techniques

  1. Preliminary design of the new Proton Synchrotron Internal Dump core

    CERN Document Server

    AUTHOR|(CDS)2091975; Nuiry, François-Xavier

    The luminosity of the LHC particle accelerator at CERN is planned to be upgraded in the first half of 2020s, requiring also the upgrade of its injector accelerators, including the Proton Synchrotron (PS). The PS Internal Dumps are beam dumps located in the PS accelerator ring. They are safety devices designed to stop the circulating proton beam in order to protect the accelerator from damage due to an uncontrolled beam loss. The PS Internal Dumps need to be upgraded to be able to withstand the future higher intensity and energy proton beams. The dump core is a block of material interacting with the beam. It is located in ultra-high vacuum and moved into the beam path in 150 milliseconds by an electromagnet and spring-based actuation mechanism. The circulating proton beam is shaved by the core surface during thousands of beam revolutions. The preliminary new dump core design weighs 13 kilograms and consists of an isostatically pressed fine-grain graphite and a precipitation hardened copper alloy CuCrZr. The ...

  2. On the evening of June 15, 2008, ALICE physicists saw the first tracks at LHC during the first injection test in transfer line TI 2. The Silicon Pixel detector recorded muon tracks produced in the beam dump near Point 2 of the LHC.

    CERN Multimedia

    Manzari, Vito

    2008-01-01

    On the evening of June 15, 2008, ALICE physicists saw the first tracks at LHC during the first injection test in transfer line TI 2. The Silicon Pixel detector recorded muon tracks produced in the beam dump near Point 2 of the LHC

  3. Deflection system for charged-particle beam

    Energy Technology Data Exchange (ETDEWEB)

    Bates, T

    1982-01-13

    A system is described for achromatically deflecting a beam of charged particles without producing net divergence of the beam comprising three successive magnetic deflection means which deflect the beam alternately in opposite directions; the first and second deflect by angles of less than 50/sup 0/ and the third by an angle of at least 90/sup 0/. Particles with different respective energies are transversely spaced as they enter the third deflection means, but emerge completely superimposed in both position and direction and may be brought to a focus in each of two mutually perpendicular planes, a short distance thereafter. Such a system may be particularly compact, especially in the direction in which the beam leaves the system. It is suitable for deflecting a beam of electrons from a linear accelerator so producing a vertical beam of electron (or with an X-ray target, of X-rays) which can be rotated about a horizontal patient for radiation therapy.

  4. Supervision Software for the Integration of the Beam Interlock System with the CERN Accelerator Complex

    CERN Document Server

    Audrain, M; Dragu, M; Fuchsberger, K; Garnier, JC; Gorzawski, AA; Koza, M; Krol, K; Moscatelli, A; Puccio, B; Stamos, K; Zerlauth, M

    2014-01-01

    The Accelerator complex at the European Organisation for Nuclear Research (CERN) is composed of many systems which are required to function in a valid state to ensure safe beam operation. One key component of machine protection, the Beam Interlock System (BIS), was designed to interface critical systems around the accelerator chain, provide fast and reliable transmission of beam dump requests and trigger beam extraction in case of malfunctioning of equipment systems or beam losses. Numerous upgrades of accelerator and controls components during the Long Shutdown 1 (LS1) are followed by subsequent software updates that need to be thoroughly validated before the restart of beam operation in 2015. In parallel, the ongoing deployments of the BIS hardware in the PS booster (PSB) and the future LINAC4 give rise to new requirements for the related controls and monitoring software due to their fast cycle times. This paper describes the current status and ongoing work as well as the long-term vision for the integratio...

  5. Neutral beam data systems at ORNL

    International Nuclear Information System (INIS)

    Stewart, C.R.

    1982-01-01

    A control system for neutral injection beam lines has been designed, implemented, and used with much success. Despite the problems with very high power levels this system is very successful in relieving the operators burdens of slow conditioning, data recording, and mode switching. The use of computer control with multiple beam lines now appears very promising

  6. Advanced Light Source beam diagnostics systems

    International Nuclear Information System (INIS)

    Hinkson, J.

    1993-10-01

    The Advanced Light Source (ALS), a third-generation synchrotron light source, has been recently commissioned. Beam diagnostics were very important to the success of the operation. Each diagnostic system is described in this paper along with detailed discussion of its performance. Some of the systems have been in operation for two years. Others, in the storage ring, have not yet been fully commissioned. These systems were, however, working well enough to provide the essential information needed to store beam. The devices described in this paper include wall current monitors, a beam charge monitor, a 50 ohm Faraday cup, DC current transformers, broad-hand striplines, fluorescence screens, beam collimators and scrapers, and beam position monitors. Also, the means by which waveforms are digitized and displayed in the control room is discussed

  7. Vibrations and stability of complex beam systems

    CERN Document Server

    Stojanović, Vladimir

    2015-01-01

     This book reports on solved problems concerning vibrations and stability of complex beam systems. The complexity of a system is considered from two points of view: the complexity originating from the nature of the structure, in the case of two or more elastically connected beams; and the complexity derived from the dynamic behavior of the system, in the case of a damaged single beam, resulting from the harm done to its simple structure. Furthermore, the book describes the analytical derivation of equations of two or more elastically connected beams, using four different theories (Euler, Rayleigh, Timoshenko and Reddy-Bickford). It also reports on a new, improved p-version of the finite element method for geometrically nonlinear vibrations. The new method provides more accurate approximations of solutions, while also allowing us to analyze geometrically nonlinear vibrations. The book describes the appearance of longitudinal vibrations of damaged clamped-clamped beams as a result of discontinuity (damage). It...

  8. Beam position monitor system for storage rings

    International Nuclear Information System (INIS)

    Nakamura, M.; Hinkson, J.A.

    1985-05-01

    Beam position monitors (BPM) for synchrotron light storage rings usually consist of beam pickup electrodes, coaxial relays and a narrowband receiver. While accurate, these systems are slow and of limited use in the commissioning of an accelerator. A beam position monitor is described which is intended to be a principal diagnostic during debug and routine running of a storage ring. It is capable of measuring the position of a single bunch on the first or nth orbit to an accuracy of a few percent. Stored beam position is more accurately measured with averaging techniques. Beam position changes can be studied in a bandwidth from DC to a few MHz. The beam monitor electronics consist of a separate amplification, detection, and sampling channel for each beam pickup electrode. Fast switches in each channel permit selection of the nth turn for measurement (single bunch mode). A calibration pulse is injected into each channel after beam measurement to permit gain offsets to be measured and removed from the final data. While initially more costly than the usual beam position monitor system, this sytem will pay for itself in reduced storage ring debug and trouble shooting time. 5 refs., 5 figs

  9. Beam-scanning system for determination of beam profiles and form factors in merged-beam experiments

    International Nuclear Information System (INIS)

    Keyser, C.J.; Froelich, H.R.; Mitchell, J.B.A.; McGowan, J.W.

    1979-01-01

    A beam-scanning system for a merged electron-ion beam experiment is described. This system is used to determine the horizontal and vertical beam profiles and the form factors at three different locations along the axis of the beams. Design details of the wedge-shaped scanners and the electronic circuit for obtaining beam profiles and form factors are described. The form factor derivation for merged beams is given and an expression in terms of measured quantities is derived. (author)

  10. Allegheny County Illegal Dump Sites

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — The Illegal Dump Site dataset includes information on illegal dump sites, their type of trash, and the estimate tons of trash at each site. The information was...

  11. PLS beam position measurement and feedback system

    International Nuclear Information System (INIS)

    Huang, J.Y.; Lee, J.; Park, M.K.; Kim, J.H.; Won, S.C.

    1992-01-01

    A real-time orbit correction system is proposed for the stabilization of beam orbit and photon beam positions in Pohang Light Source. PLS beam position monitoring system is designed to be VMEbus compatible to fit the real-time digital orbit feedback system. A VMEbus based subsystem control computer, Mil-1553B communication network and 12 BPM/PS machine interface units constitute digital part of the feedback system. With the super-stable PLS correction magnet power supply, power line frequency noise is almost filtered out and the dominant spectra of beam obtit fluctuations are expected to appear below 15 Hz. Using DSP board in SCC for the computation and using an appropriate compensation circuit for the phase delay by the vacuum chamber, PLS real-time orbit correction system is realizable without changing the basic structure of PLS computer control system. (author)

  12. 650-nJ pulses from a cavity-dumped Yb:fiber-pumped ultrafast optical parametric oscillator

    Science.gov (United States)

    Lamour, Tobias P.; Reid, Derryck T.

    2011-08-01

    Sub-250-fs pulses with energies of up to 650 nJ and peak powers up to 2.07 MW were generated from a cavity-dumped optical parametric oscillator, synchronously-pumped at 15.3 MHz with sub-400-fs pulses from an Yb:fiber laser. The average beam quality factor of the dumped output was M2 ~1.2 and the total relative-intensity noise was 8 mdBc, making the system a promising candidate for ultrafast laser inscription of infrared materials.

  13. Machine protection systems

    CERN Document Server

    Macpherson, A L

    2010-01-01

    A summary of the Machine Protection System of the LHC is given, with particular attention given to the outstanding issues to be addressed, rather than the successes of the machine protection system from the 2009 run. In particular, the issues of Safe Machine Parameter system, collimation and beam cleaning, the beam dump system and abort gap cleaning, injection and dump protection, and the overall machine protection program for the upcoming run are summarised.

  14. The SSRL injector beam position monitoring systems

    International Nuclear Information System (INIS)

    Lavender, W.; Baird, S.; Brennan, S.; Borland, M.; Hettel, R.; Nuhn, H.D.; Ortiz, R.; Safranek, J.; Sebek, J.; Wermelskirchen, C.; Yang, J.

    1991-01-01

    The beam position monitoring system of the SSRL injector forms a vital component of its operation. Several different types of instrumentation are used to measure the position or intensity of the electron beam in the injector. These include current toroids, fluorescent screens, Faraday cups, the 'Q' meter, a synchrotron light monitor, and electron beam position monitors. This paper focuses on the use of the electron beam position monitors to measure electron trajectories in the injector transport lines and the booster ring. The design of the beam position monitors is described in another paper to be presented at this conference. There are three different beam position monitor systems in the injector. One system consists of a set of five BPMs located on the injection transport line from the linac to the booster (known as the LTB line). There is a second system of six BPMs located on the ejection transport line (known as the BTS line). Finally, there is an array of 40 BPMs installed on the main booster ring itself. This article describes the software and processing electronics of the systems used to measure electron beam trajectories for the new SSRL injector for SPEAR

  15. Detection systems for radioactive ion beams

    International Nuclear Information System (INIS)

    Savajols, H.

    2002-01-01

    Two main methods are used to produce radioactive ion beams: -) the ISOL method (isotope separation on-line) in which the stable beam interacts with a thick target, the reaction products diffuse outside the target and are transferred to a source where they are ionized, a mass separator and a post-accelerator drive the selected radioactive ions to the right energy; -) the in-flight fragmentation method in which the stable beam interacts with a thin target, the reaction products are emitted from the target with a restricted angular distribution and a velocity close to that of the incident beam, the experimenter has to take advantage from the reaction kinetics to get the right particle beam. Characteristic time is far longer with the ISOL method but the beam intensity is much better because of the use of a post-accelerator. In both cases, the beam intensity is lower by several orders of magnitude than in the case of a stable beam. This article presents all the constraints imposed by radioactive beams to the detection systems of the reaction products and gives new technical solutions according to the type of nuclear reaction studied. (A.C.)

  16. Beam loss detection system in the arcs of the LHC

    Science.gov (United States)

    Arauzo, A.; Bovet, C.

    2000-11-01

    Over the whole circumference of the LHC, Beam Loss Monitors (BLM) will be needed for a continuous surveillance of fast and slow beam losses. In this paper, the location of the BLMs set outside the magnet cryostats in the arcs is proposed. In order to know the number of protons lost on the beam screen, the sensitivity of each BLM has been computed using the program GEANT 3.21, which generates the shower inside the cryostat. The material and the magnetic fields have been described thoroughly in 3-D and the simulation results show the best locations for 6 BLMs needed around each quadrupole. The number of minimum ionizing particles received for each lost proton serves to define local thresholds to dump the beam when the losses are menacing to quench a magnet.

  17. Beam loss detection system in the arcs of the LHC

    International Nuclear Information System (INIS)

    Arauzo, A.; Bovet, C.

    2000-01-01

    Over the whole circumference of the LHC, Beam Loss Monitors (BLM) will be needed for a continuous surveillance of fast and slow beam losses. In this paper, the location of the BLMs set outside the magnet cryostats in the arcs is proposed. In order to know the number of protons lost on the beam screen, the sensitivity of each BLM has been computed using the program GEANT 3.21, which generates the shower inside the cryostat. The material and the magnetic fields have been described thoroughly in 3-D and the simulation results show the best locations for 6 BLMs needed around each quadrupole. The number of minimum ionizing particles received for each lost proton serves to define local thresholds to dump the beam when the losses are menacing to quench a magnet

  18. High power 1 MeV neutral beam system and its application plan for the international tokamak experimental reactor

    Energy Technology Data Exchange (ETDEWEB)

    Hemsworth, R S [ITER Joint Central Team, Naka, Ibaraki (Japan)

    1997-03-01

    This paper describes the Neutral Beam Injection system which is presently being designed for the International Tokamak Experimental Reactor, ITER, in Europe Japan and Russia, with co-ordination by the Joint Central Team of ITER at Naka, Japan. The proposed system consists of three negative ion based neutral injectors, delivering a total of 50 MW of 1 MeV D{sup 0} to the ITER plasma for a pulse length of >1000 s. Each injectors uses a single caesiated volume arc discharge negative ion source, and a multi-grid, multi-aperture accelerator, to produce about 40 A of 1 MeV D{sup -}. This will be neutralized by collisions with D{sub 2} in a sub-divided gas neutralizer, which has a conversion efficiency of about 60%. The charged fraction of the beam emerging from the neutralizer is dumped in an electrostatic residual ion dump. A water cooled calorimeter can be moved into the beam path to intercept the neutral beam, allowing commissioning of the injector independent of ITER. ITER is scheduled to produce its first plasma at the beginning of 2008, and the planning of the R and D, construction and installation foresees the neutral injection system being available from the start of ITER operations. (author)

  19. Dump and Current Measurement of Unstripped H`ions at the Injection from the CERN LINAC4 Into the PS Booster

    CERN Document Server

    Chamizo, R; Goddard, B; Mereghetti, A; Versaci, R; Weterings, W

    2010-01-01

    Linac4 is the new H- linear accelerator under construction at CERN aiming to double the brightness of the beam injected to the CERN PS Booster (PSB) for delivering proton beams to experiments or further CERN accelerators, down to the LHC. The injection system in the PSB is based on the H- charge exchange where the 160 MeV H- beam is converted into an H+ beam by stripping the electrons with a carbon foil. A beam dump located inside a pulsed magnet for the injection bump will intercept the unstripped ions (H0 and H-) and measure the collected charge to detect the relative efficiency and degradation of the stripping foil. The challenge of the dump design is to meet the requirements of a beam dump providing a current measurement and at the same time minimizing the perturbation of the magnetic field of the surrounding pulsed magnet. This paper describes all phases of the dump design and the main issues related to its integration in the line.

  20. Walking beam pumping unit system efficiency measurements

    International Nuclear Information System (INIS)

    Kilgore, J.J.; Tripp, H.A.; Hunt, C.L. Jr.

    1991-01-01

    The cost of electricity used by walking beam pumping units is a major expense in producing crude oil. However, only very limited information is available on the efficiency of beam pumping systems and less is known about the efficiency of the various components of the pumping units. This paper presents and discusses measurements that have been made on wells at several Shell locations and on a specially designed walking beam pump test stand at Lufkin Industries. These measurements were made in order to determine the overall system efficiency and efficiency of individual components. The results of this work show that the overall beam pumping system efficiency is normally between 48 and 58 percent. This is primarily dependent on the motor size, motor type, gearbox size, system's age, production, pump size, tubing size, and rod sizes

  1. Reliability of Beam Loss Monitors System for the Large Hadron Collider

    Science.gov (United States)

    Guaglio, G.; Dehning, B.; Santoni, C.

    2004-11-01

    The employment of superconducting magnets in high energy colliders opens challenging failure scenarios and brings new criticalities for the whole system protection. For the LHC beam loss protection system, the failure rate and the availability requirements have been evaluated using the Safety Integrity Level (SIL) approach. A downtime cost evaluation is used as input for the SIL approach. The most critical systems, which contribute to the final SIL value, are the dump system, the interlock system, the beam loss monitors system and the energy monitor system. The Beam Loss Monitors System (BLMS) is critical for short and intense particle losses, while at medium and higher loss time it is assisted by other systems, such as the quench protection system and the cryogenic system. For BLMS, hardware and software have been evaluated in detail. The reliability input figures have been collected using historical data from the SPS, using temperature and radiation damage experimental data as well as using standard databases. All the data have been processed by reliability software (Isograph). The analysis ranges from the components data to the system configuration.

  2. Reliability of Beam Loss Monitors System for the Large Hadron Collider

    International Nuclear Information System (INIS)

    Guaglio, G.; Dehning, B.; Santoni, C.

    2004-01-01

    The employment of superconducting magnets in high energy colliders opens challenging failure scenarios and brings new criticalities for the whole system protection. For the LHC beam loss protection system, the failure rate and the availability requirements have been evaluated using the Safety Integrity Level (SIL) approach. A downtime cost evaluation is used as input for the SIL approach. The most critical systems, which contribute to the final SIL value, are the dump system, the interlock system, the beam loss monitors system and the energy monitor system. The Beam Loss Monitors System (BLMS) is critical for short and intense particle losses, while at medium and higher loss time it is assisted by other systems, such as the quench protection system and the cryogenic system. For BLMS, hardware and software have been evaluated in detail. The reliability input figures have been collected using historical data from the SPS, using temperature and radiation damage experimental data as well as using standard databases. All the data have been processed by reliability software (Isograph). The analysis ranges from the components data to the system configuration

  3. Beam studies with a LNB detector system

    Energy Technology Data Exchange (ETDEWEB)

    Schwarzkopf, Joachim; Judin, Vitali; Mueller, Anke-Susanne [Karlsruher Institut fuer Technologie (KIT), Karlsruhe (Germany)

    2013-07-01

    At ANKA, the synchrotron of the KIT (Karlsruhe Institue of Technology), beam studies with a detector system better known for its use in the entertainment industry have been carried out. The system basically consists of a LNB (Low Noise Block), usually part of a satellite TV receiver. One possible application in accelerator physics is the monitoring of the bunch length. This presentation reports on beam experiments with this inexpensive detector.

  4. Results of the studies on energy deposition in IR6 superconducting magnets from continuous beam loss on the TCDQ system

    CERN Document Server

    Bracco, C; Presland, A; Redaelli, S; Sarchiapone, L; Weiler, T

    2007-01-01

    A single sided mobile graphite diluter block TCDQ, in combination with a two-sided secondary collimator TCS and an iron shield TCDQM, will be installed in front of the superconducting quadrupole Q4 magnets in IR6, in order to protect it and other downstream LHC machine elements from destruction in the event of a beam dump that is not synchronised with the abort gap. The TCDQ will be positioned close to the beam, and will intercept the particles from the secondary halo during low beam lifetime. Previous studies (1-4) have shown that the energy deposited in the Q4 magnet coils can be close to or above the quench limit. In this note the results of the latest FLUKA energy deposition simulations for Beam 2 are described, including an upgrade possibility for the TCDQ system with an additional shielding device. The results are discussed in the context of the expected performance levels for the different phases of LHC operation.

  5. Low energy beam transport system developments

    Energy Technology Data Exchange (ETDEWEB)

    Dudnikov, V., E-mail: vadim@muonsinc.com [Muons, Inc., Batavia, IL 60510 (United States); Han, B.; Stockli, M.; Welton, R. [ORNL, Oak Ridge, TN 37831 (United States); Dudnikova, G. [University of Maryland, College Park, MD 3261 (United States); Institute of Computational Technologies SBRAS, Novosibirsk (Russian Federation)

    2015-04-08

    For high brightness beam production it is important to preserve the brightness in the low energy beam transport system (LEBT) used to transport and match the ion beams to the next stage of acceleration, usually an RFQ. While electrostatic focusing can be problematic for high current beam transport, reliable electrostatic LEBT operation has been demonstrated with H{sup −} beams up to 60 mA. Now, however, it is commonly accepted that an optimal LEBT for high current accelerator applications consists of focusing solenoids with space charge compensation. Two-solenoid LEBTs are successfully used for high current (>100 mA) proton beam transport. Preservation of low emittances (~0.15 π mm-mrad) requires the addition of a heavy gas (Xe, Kr), which causes ~5% of proton loss in a 1 m long LEBT. Similar Xe densities would be required to preserve low emittances of H{sup −} beams, but such gas densities cause unacceptably high H{sup −} beam losses. A short LEBT with only one short solenoid, movable for RFQ matching, can be used for reduced negative ion stripping. A strong electrostatic-focusing LEBT has been successfully adopted for transport of high current H{sup −} beams in the SNS Front End. Some modifications of such electrostatic LEBTs are expected to improve the reliable transport of intense positive and negative ion beams without greatly degrading their low emittances. We concentrate on processes that determine the beam brightness degradation and on their prevention. Proposed improvements to the SNS electrostatic LEBT are discussed.

  6. A machine protection beam position monitor system

    International Nuclear Information System (INIS)

    Medvedko, E.; Smith, S.; Fisher, A.

    1998-01-01

    Loss of the stored beam in an uncontrolled manner can cause damage to the PEP-II B Factory. We describe here a device which detects large beam position excursions or unexpected beam loss and triggers the beam abort system to extract the stored beam safely. The bad-orbit abort trigger beam position monitor (BOAT BPM) generates a trigger when the beam orbit is far off the center (>20 mm), or rapid beam current loss (dI/dT) is detected. The BOAT BPM averages the input signal over one turn (136 kHz). AM demodulation is used to convert input signals at 476 MHz to baseband voltages. The detected signal goes to a filter section for suppression of the revolution frequency, then on to amplifiers, dividers, and comparators for position and current measurements and triggering. The derived current signal goes to a special filter, designed to perform dI/dT monitoring at fast, medium, and slow current loss rates. The BOAT BPM prototype test results confirm the design concepts. copyright 1998 American Institute of Physics

  7. Resistive-wall Wake Effect in the Beam Delivery System

    International Nuclear Information System (INIS)

    Delayen, J.R.; Jefferson Lab; Wu, Juhao; Raubenheimer, T.O.; SLAC; Wang, Jiunn-Ming; BNL, NSLS

    2005-01-01

    General formulae for resistive-wall induced beam dilution are presented and then applied to the final beam delivery system of linear colliders. Criteria for the design of final beam delivery systems are discussed

  8. Antares beam-alignment-system performance

    International Nuclear Information System (INIS)

    Appert, Q.D.; Bender, S.C.

    1983-01-01

    The beam alignment system for the 24-beam-sector Antares CO 2 fusion laser automatically aligns more than 200 optical elements. A visible-wavelength alignment technique is employed which uses a telescope/TV system to view point-light sources appropriately located down the beamline. The centroids of the light spots are determined by a video tracker, which generates error signals used by the computer control system to move appropriate mirrors in a closed-loop system. Final touch-up alignment is accomplished by projecting a CO 2 alignment laser beam through the system and sensing its position at the target location. The techniques and control algorithms employed have resulted in alignment accuracies exceeding design requirements. By employing video processing to determine the centroids of diffraction images and by averaging over multiple TV frames, we achieve alignment accuracies better than 0.1 times system diffraction limits in the presence of air turbulence

  9. A simple electron-beam lithography system

    DEFF Research Database (Denmark)

    Mølhave, Kristian; Madsen, Dorte Nørgaard; Bøggild, Peter

    2005-01-01

    A large number of applications of electron-beam lithography (EBL) systems in nanotechnology have been demonstrated in recent years. In this paper we present a simple and general-purpose EBL system constructed by insertion of an electrostatic deflector plate system at the electron-beam exit...... of the column of a scanning electron microscope (SEM). The system can easily be mounted on most standard SEM systems. The tested setup allows an area of up to about 50 x 50 pm to be scanned, if the upper limit for acceptable reduction of the SEM resolution is set to 10 run. We demonstrate how the EBL system can...... be used to write three-dimensional nanostructures by electron-beam deposition. (C) 2004 Elsevier B.V. All rights reserved....

  10. TFTR neutral beam injection system conceptual design

    International Nuclear Information System (INIS)

    1975-01-01

    Three subsystems are described in the following chapters: (1) Neutral Beam Injection Line; (2) Power Supplies; and (3) Controls. Each chapter contains two sections: (1) Functions and Design Requirements; this is a brief listing of the requirements of components of the subsystem. (2) Design Description; this section describes the design and cost estimates. The overall performance requirements of the neutral beam injection system are summarized. (MOW)

  11. Construction of ion beam pulse radiolysis system

    Energy Technology Data Exchange (ETDEWEB)

    Chitose, Norihisa; Katsumura, Yosuke; Domae, Masafumi; Ishigure, Kenkichi; Murakami, Takeshi [Tokyo Univ. (Japan)

    1996-10-01

    An ion beam pulse radiolysis system has been constructed at HIMAC facility. Ion beam of 24 MeV He{sup 2+} with the duration longer than 1 {mu}s is available for irradiation. Three kinds of aqueous solutions, (C{sub 6}H{sub 5}){sub 2}CO, NaHCO{sub 3} and KSCN, were irradiated and the absorption signals were observed. (author)

  12. The AGS Booster Beam Position Monitor system

    International Nuclear Information System (INIS)

    Ciardullo, D.J.; Abola, A.; Beadle, E.R.; Smith, G.A.; Thomas, R.; Van Zwienen, W.; Warkentien, R.; Witkover, R.L.

    1991-01-01

    To accelerate both protons and heavy ions, the AGS Booster requires a broadband (multi-octave) beam position monitoring system with a dynamic range spanning several orders of magnitude (2 x 10 10 to 1.5 x 10 13 particles per pulse). System requirements include the ability to acquire single turn trajectory and average orbit information with ± 0.1 mm resolution. The design goal of ± 0.5 mm corrected accuracy requires that the detectors have repeatable linear performance after periodic bakeout at 300 degree C. The system design and capabilities of the Booster Beam Position Monitor will be described, and initial results presented. 7 refs., 5 figs

  13. Scattered radiation in fan beam imaging systems

    International Nuclear Information System (INIS)

    Johns, P.C.; Yaffe, M.

    1982-01-01

    Scatter-to-primary energy fluence ratios (S/P) have been studied for fan x-ray beams as used in CT scanners and slit projection radiography systems. The dependence of S/P on phantom diameter, distance from phantom to image receptor, and kilovoltage is presented. An empirical equation is given that predicts S/P over a wide range of fan beam imaging configurations. For CT body scans on a 4th-generation machine, S/P is approximately 5%. Scattered radiation can produce a significant cupping artefact in CT images which is similar to that due to beam hardening. When multiple slices are used in scanned slit radiography, they can be arranged such that the increase in S/P is negligible. Calculations of scatter-to-primary ratios for first order scattering showed that for fan beams the contribution of coherent scatter is comparable to or greater than that of incoherent first scatter

  14. The elettra beam line control system

    International Nuclear Information System (INIS)

    Mignacco, M.; Abrami, A.; Dequal, Z.

    1994-01-01

    Elettra is a third generation Synchrotron Light Source located in Trieste (Italy). It consists of a full energy linac injector and a storage ring with beam energies between 1.5 and 2 GeV. The facility is scheduled to be operational by end 1993. For the whole project 22 beam lines from insertion devices are foreseen, each of them is composed of a large number of measurement and controls instruments, most of them embedded in intelligent devices; in addition each beam line can be considered unique compared to the others, having been designed to provide a different kind of synchrotron radiation. This results in a large not homogenous environment where more than 200,000 physical points have to be controlled. A joint team composed of Softeco Sismat and Digital Equipment has developed a fully automated beam line control system able to give full remote controls, with different kind of access rights, to beam line users and beam line specialists as well as a full integration with experiment control systems. ((orig.))

  15. The beam diagnosis system for ELSA

    International Nuclear Information System (INIS)

    Schillo, M.

    1991-10-01

    A beam diagnostic system, which is based on capacitive beam-position monitors combined with fast electronics, has been developed for the Bonn Electron Stretcher Accelerator ELSA. The position signal of each monitor is digitized at an adjustable sampling rate and the most recent 8192 position and intensity values are buffered. This allows a wide range of different beam diagnostic measurements. The main purpose is the closed-orbit correction, which can be carried out on various time scales. To optimize the duty factor of the extracted beam, the system can also be used as a fast relative intensity monitor resolving the intensity distribution of the bunches or of the injected beam. It is designed to support betatron tune and phase measurements with very high accuracy, offering the choice to select any of the beam position monitors. This enables the measuring of many optical parameters. Furthermore any pair of suitable monitors can be used for experimental particle tracking or phase space measurements. (orig.) [de

  16. A beam diagnostic system for ELSA

    International Nuclear Information System (INIS)

    Schillo, M.; Althoff, K.H.; Drachenfels, W.; Goetz, T.; Husmann, D.; Neckenig, M.; Picard, M.; Schittko, F.J.; Schauerte, W.; Wenzel, J.

    1991-01-01

    A beam diagnostic system, which is based on capacitive beam-position monitors combined with fast electronics, has been developed for the Bonn ELectron Stretcher Accelerator ELSA. The position signal of each monitor is digitized at an adjustable sampling rate (max.: 10 MHz) and the most recent 8192 position and intensity values are buffered. This allows a wide range of different beam diagnostic measurements. The main purpose is the closed-orbit correction, which can be carried out on various time scales. To optimize the duty factor of the extracted beam, the system can also be used as a fast relative intensity monitor resolving the intensity distribution of the bunches or of the injected beam. It is designed to support betatron tune and phase measurements with very high accuracy, offering the choice to select any of the beam position monitors. This enables the measuring of many optical parameters. Furthermore any pair of suitable monitors can be used for experimental particle tracking or phase space measurements

  17. Design of the ITER (International Thermonuclear Experimental Reactor) neutral beam system beamline, United States concept

    International Nuclear Information System (INIS)

    Purgalis, P.; Anderson, O.A.; Cooper, W.S.; DeVries, G.E.; Lietzke, A.F.; Kunkel, W.B.; Kwan, J.W.; Matuk, C.A.; Nakai, T.; Stearns, J.W.; Soroka, L.; Wells, R.P.; Lindquist, W.B.; Neef, W.S.; Reginato, L.L.; Sedgley, D.W.; Brook, J.W.; Luzzi, T.E.; Myers, T.J.

    1989-01-01

    Design of a neutral beamline for ITER (International Thermonuclear Experimental Reactor) is described. The design incorporates a barium surface conversion D - source feeding a linear array of accelerator channels. The system uses a dc accelerator with electrostatic quadrupoles for strong focusing. A high voltage power supply that is integrated with the accelerator is presented as an attractive option. A gas neutralizer is used and residual ions exiting the neutralizer are deflected to watercooled dumps. Cryopanels are located at the accelerator exit to pump excess gas from the source and the neutralizer, and in the ion dump cavity to pump re-neutralized ions and neutralizer gas. All the above components are packaged in compact identical, independent modules that can be removed for remote maintenance. The neutral beam system delivers 75 MW of D degree into three ports with a total of nine modules arranged in stacks of three modules per port. To increase reliability each module is designed to deliver up to 10 MW at 1.3 MeV; this allows eight modules operating at partial capacity to deliver the required power in the event one module is removed from service. Radiation protection is provided by shielding and by locating critical components in the source and accelerator 35 m from the port into the torus. Neutron shielding in the drift duct provides the added feature of limiting conductance and thus reducing gas flow to and from the torus. Alternative component choices are also discussed for the evolving design. 8 refs., 4 figs., 1 tab

  18. Beam developments for the Harwell microprobe system

    International Nuclear Information System (INIS)

    Read, P.M.; Cookson, J.A.; Alton, G.D.

    1986-01-01

    A consequence of the rapid development of micron and submicron size electronic devices is the diminished applicability of high energy ion microprobes with their present resolution limitations to the study of such components. Although submicron beams have been reported the available beam current is barely sufficiently for PIXE and is not adequate for RBS. This lack of lateral resolution is due to low beam brightness at the microprobe object and aberrations in the focusing elements. As part of a program to address these problems the Harwell microprobe lens has been relocated on a new 5 MV Laddertron accelerator. The increased brightness and improved stability of this facility has so far led to a reduction in beam size from 3 x 3 μm 2 to about 2 x 2 μm 2 . The feasibility of using a liquid metal ion source has been examined with a view to achieving more substantial increases in brightness. While such sources have brightness approximately 10 5 times greater than conventional gaseous sources the highly divergent nature of the beam presents problems for the beam transport system. The use of a liquid metal source on the accelerator has been successfully demonstrated but it indicates the need for a special low aberration injection lens if brightness is to be maintained

  19. Neutral beam system for an ignition tokamak

    International Nuclear Information System (INIS)

    Fasolo, J.; Fuja, R.; Jung, J.; Moenich, J.; Norem, J.; Praeg, W.; Stevens, H.

    1978-01-01

    We have attempted to make detailed designs of several neutral beam systems which would be applicable to a large machine, e.g. an ITR (Ignition Test Reactor), EPR (Experimental Power Reactor), or reactor. Detailed studies of beam transport to the reactor and neutron transport from the reactor have been made. We have also considered constraints imposed by the neutron radiation environment in the injectors, and the resulting shielding, radiation-damage, and maintenance problems. The effects of neutron heat loads on cryopanels and ZrAl getter panels have been considered. Design studies of power supplies, vacuum systems, bending magnets, and injector layouts are in progress and will be discussed

  20. SISTEM PENGOLAHAN AIR ASAM TAMBANG PADA WATER POND DAN APLIKASI MODEL ENCAPSULATION IN-PIT DISPOSAL PADA WASTE DUMP TAMBANG BATUBARA (Acid Mine Drainage Treatment System in Water Pond and Application of Encapsulation In-Pit Disposal Model in Waste Dump

    Directory of Open Access Journals (Sweden)

    Andy R. Erwin Wijaya

    2010-03-01

    . The control system of acid mine drainage contamination included treatment of acid mine drainage into water pond and management of oxide/benign waste on the waste dump. Treatment method is neutralization of acid mine drainage into water pond using alkali reagent. The most effective and economic alkali reagent is limestone. Amount of limestone needed to neutralize of acid mine drainage (5040 m3 into water pond is 104.56 kg. The management of oxide/benign waste is application of encapsulation in-pit disposal model. This model is more effective to prevent acid mine drainage formed. Cover materials are often clay subsoils and have been used for covering to prevent oxidation. The clay have high compaction rates and low permeability (2.3148 x 10-9 m/s and this material is sufficient availability.

  1. RHIC Beam Loss Monitor System Initial Operation

    International Nuclear Information System (INIS)

    Witkover, R. L.; Michnoff, R. J.; Geller, J. M.

    1999-01-01

    The RHIC Beam Loss Monitor (BLM) System is designed to prevent beam loss quenching of the superconducting magnets, and acquire loss data. Four hundred ion chambers are located around the rings to detect losses. The required 8-decade range in signal current is compressed using an RC pre-integrator ahead of a low current amplifier. A beam abort may be triggered if fast or slow losses exceed programmable threshold levels. A micro-controller based VME module sets references and gains and reads trip status for up to 64 channels. Results obtained with the detectors in the RHIC Sextant Test and the prototype electronics in the AGS-to-RHIC (AtR) transfer line are presented along with the present status of the system

  2. The AGS Booster beam loss monitor system

    International Nuclear Information System (INIS)

    Beadle, E.R.; Bennett, G.W.; Witkover, R.L.

    1991-01-01

    A beam loss monitor system has been developed for the Brookhaven National Laboratory Booster accelerator, and is designed for use with intensities of up to 1.5 x 10 13 protons and carbon to gold ions at 50-3 x 10 9 ions per pulse. This system is a significant advance over the present AGS system by improving the sensitivity, dynamic range, and data acquisition. In addition to the large dynamic range achievable, it is adaptively shifted when high losses are detected. The system uses up to 80 argon filled ion chambers as detectors, as well as newly designed electronics for processing and digitizing detector outputs. The hardware simultaneously integrates each detector output, interfaces to the beam interrupt systems, and digitizes all 80 channels to 21 bits at 170 KHz. This paper discuses the design, construction, and operation of the system. 4 refs., 2 figs

  3. Neutral particle beam distributed data acquisition system

    International Nuclear Information System (INIS)

    Daly, R.T.; Kraimer, M.R.; Novick, A.H.

    1987-01-01

    A distributed data acquisition system has been designed to support experiments at the Argonne Neutral Particle Beam Accelerator. The system uses a host VAXstation II/GPX computer acting as an experimenter's station linked via Ethernet with multiple MicroVAX IIs and rtVAXs dedicated to acquiring data and controlling hardware at remote sites. This paper describes the hardware design of the system, the applications support software on the host and target computers, and the real-time performance

  4. Pressure rise analysis in superconducting coils during dumping

    International Nuclear Information System (INIS)

    Tada, E.; Shimamoto, S.

    1984-01-01

    This chapter describes the ALPHE computer code, whose purpose is to calculate transient helium behavior in a poolboiling coil and to determine suitable characteristics of safety devices to minimize the maximum pressure and the liquid helium lost during dumping due to quench, or when discharging without normalcy. The analysis is compared with the measurements obtained in the domestic test of the Japanese LCT coil. Topics considered include basic equations (helium behavior, heat generation), manual dump without quench, and dumping due to quench. It is demonstrated that the transient behavior, calculated by ALPHE assuming quasi-static equilibrium between helium and coil, is in good agreement with the experimental measurements observed in the domestic test of the Japanese LCT coil. The engineering technique required for the design criteria of superconducting coils and safety device during dumping is established. ALPHE can be used to design an emergency safety system for a helium refrigerator during dumping

  5. Ion beam pulse radiolysis system at HIMAC

    Energy Technology Data Exchange (ETDEWEB)

    Chitose, N; Katsumura, Y; Domae, M; Ishigure, K [Tokyo Univ. (Japan); Murakami, T

    1997-03-01

    An ion beam pulse radiolysis system has been constructed at HIMAC facility. Ion beam of 24MeV He{sup 2+} with the duration longer than 1 {mu}s is available for irradiation. Three kinds of aqueous solutions, (C{sub 6}H{sub 5}){sub 2}CO, NaHCO{sub 3}, and KSCN, were irradiated and the absorption signals corresponding to (C{sub 6}H{sub 5}){sub 2}CO{sup -}, CO{sub 3}{sup -}, and (SCN){sub 2}{sup -} respectively were observed. Ghost signals which interfere with the measurement are also discussed. (author)

  6. Experience with FreeStyle Libre Flash glucose monitoring system in management of refractory dumping syndrome in pregnancy shortly after bariatric surgery

    Directory of Open Access Journals (Sweden)

    Peter Novodvorsky

    2017-12-01

    Full Text Available Bariatric surgery is an effective therapy for obesity but is associated with long-term complications such as dumping syndromes and nutritional deficiencies. We report a case of a 26-year-old caucasian female, with history of morbid obesity and gestational diabetes (GDM, who became pregnant 4 months after Roux-en-Y bypass surgery. She developed GDM during subsequent pregnancy, which was initially managed with metformin and insulin. Nocturnal hypoglycaemia causing sleep disturbance and daytime somnolence occured at 19 weeks of pregnancy (19/40. Treatment with rapid-acting carbohydrates precipitated further hypoglycaemia. Laboratory investigations confirmed hypoglycaemia at 2.2 mmol/L with appropriately low insulin and C-peptide, intact HPA axis and negative IgG insulin antibodies. The patient was seen regularly by the bariatric dietetic team but concerns about compliance persisted. A FreeStyle Libre system was used from 21/40 enabling the patient a real-time feedback of changes in interstitial glucose following high or low GI index food intake. The patient declined a trial of acarbose but consented to an intraveneous dextrose infusion overnight resulting in improvement but not complete abolishment of nocturnal hypoglycaemia. Hypoglycaemias subsided at 34/40 and metformin and insulin had to be re-introduced due to high post-prandial blood glucose readings. An emergency C-section was indicated at 35 + 1/40 and a small-for-gestational-age female was delivered. There have been no further episodes of hypoglycaemia following delivery. This case illustrates challenges in the management of pregnancy following bariatric surgery. To our knowledge, this is the first use of FreeStyle Libre in dumping syndrome in pregnancy following bariatric surgery with troublesome nocturnal hypoglycaemia.

  7. The CMS Beam Halo Monitor Detector System

    CERN Document Server

    CMS Collaboration

    2015-01-01

    A new Beam Halo Monitor (BHM) detector system has been installed in the CMS cavern to measure the machine-induced background (MIB) from the LHC. This background originates from interactions of the LHC beam halo with the final set of collimators before the CMS experiment and from beam gas interactions. The BHM detector uses the directional nature of Cherenkov radiation and event timing to select particles coming from the direction of the beam and to suppress those originating from the interaction point. It consists of 40 quartz rods, placed on each side of the CMS detector, coupled to UV sensitive PMTs. For each bunch crossing the PMT signal is digitized by a charge integrating ASIC and the arrival time of the signal is recorded. The data are processed in real time to yield a precise measurement of per-bunch-crossing background rate. This measurement is made available to CMS and the LHC, to provide real-time feedback on the beam quality and to improve the efficiency of data taking. In this talk we will describ...

  8. Versatile H+ beam chopper system at LAMPF

    International Nuclear Information System (INIS)

    Lunsford, J.S.; Lawrence, G.P.; Bentley, R.F.

    1979-01-01

    The H + chopper system at LAMPF provides two modes (A and B) of beam chopping. Mode A provides single micropulses separated by 1 μs or more. Mode B provides a single pulse 50-ns to 10-μs long at the LAMPF repetition rate of 12 Hz. The mode of operation is selected with coaxial relays which can switch during the dead time between LAMPF macropulses. The chopper consists of 1-m-long push-pull helical-wound slow-wave deflecting structures having an axial pulse velocity of 0.04c, which matches the velocity of the proton beam. The helix ground-planes are biased by a pulser providing push-pull 500-V pulses to deflect the H + beam from the injection channel. In chopping mode A, the helical windings are driven by push-pull, 1000-V, 5-ns pulses delivered by a circuit utilizing avalanche transistors and planar triodes. In mode B, the helical windings are driven by push-pull, 1000-V, 50-ns to 10-μs long pulses, produced by a circuit utilizing beam-power tetrodes and fast SCRs. In both modes, these pulses cancel the ground-plane bias and permit beam pulses to be delivered to the linac

  9. Dumping at Sea Act 1974

    International Nuclear Information System (INIS)

    1974-01-01

    This Act enables the United Kingdom Government to ratify both the Oslo Convention of 1972 for the Prevention of Marine Pollution by Dumping from Ships and Aircraft and the London Convention of 1972 on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter. (NEA) [fr

  10. Dumping in a Global World

    NARCIS (Netherlands)

    J.L. Moraga-Gonzalez (José Luis); J.M.A. Viaene (Jean-Marie)

    2004-01-01

    textabstractAnti-dumping actions are now the trade policy of choice of developing and transition economies. To understand why these economies have increasingly applied anti-dumping laws, we build a simple theoretical model of vertical intra-industry trade and investigate the strategic incentives of

  11. Development of KSTAR Neutral Beam Heating System

    Energy Technology Data Exchange (ETDEWEB)

    Oh, B. H.; Song, W. S.; Yoon, B. J. (and others)

    2007-10-15

    The prototype components of a neutral beam injection (NBI) system have been developed for the KSTAR, and a capability of the manufactured components has been tested. High power ion source, acceleration power supply, other ion source power supplies, neutralizer, bending magnet for ion beam separation, calorimeter, and cryo-sorption pump have been developed by using the domestic technologies and tested for a neutral beam injection of 8 MW per beamline with a pulse duration of 300 seconds. The developed components have been continuously upgraded to achieve the design requirements. The development technology of high power and long pulse neutral beam injection system has been proved with the achievement of 5.2 MW output for a short pulse length and 1.6 MW output for a pulse length of 300 seconds. Using these development technologies, the domestic NB technology has been stabilized under the development of high power ion source, NB beamline components, high voltage and current power supplies, NB diagnostics, NB system operation and control.

  12. Implementation of EPICS based Control System for Radioisotope Beam line

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae-Ha; Ahn, Tae-Sung; Song, Young-Gi; Kwon, Hyeok-Jung; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Gyeongju (Korea, Republic of)

    2015-10-15

    Korea Mult-purpose Accelerator Complex (KOMAC) has been operating 100 MeV proton linear accelerator . For operating 100 MeV linac, various control system has been implemented such as vacuum, power supply, RCCS and etc. KOMAC is operating two beam lines so that clients can use 100 MeV proton beam for their experiment. KOMAC sends beam to beam line and target room using two dipole magnets and several quadrupole magnets. As demand for experiments and Radius Isotope using beam is increased, another beam line is under construction and RI beam line control system is need. To synchronize with KOMAC control system, RI beam line control system is based on Experimental Physics and Industrial control System (EPICS) software. The beam is transported to RI beam line to control magnet power supply and vacuum. Implementation of RI beam line control system is presented and some preliminary results are reported. The base RI beam line control system is implemented. It can control beam direction and vacuum. Comparing archived data and current data, RI beam line and control system will be improved. In the future, scroll pump and gate control system will be implemented using programmable logic controller PLC. RI beam interlock sequence will be added to KOMAC interlock system to protect linac.

  13. HDF-EOS Dump Tools

    Science.gov (United States)

    Prasad, U.; Rahabi, A.

    2001-05-01

    The following utilities developed for HDF-EOS format data dump are of special use for Earth science data for NASA's Earth Observation System (EOS). This poster demonstrates their use and application. The first four tools take HDF-EOS data files as input. HDF-EOS Metadata Dumper - metadmp Metadata dumper extracts metadata from EOS data granules. It operates by simply copying blocks of metadata from the file to the standard output. It does not process the metadata in any way. Since all metadata in EOS granules is encoded in the Object Description Language (ODL), the output of metadmp will be in the form of complete ODL statements. EOS data granules may contain up to three different sets of metadata (Core, Archive, and Structural Metadata). HDF-EOS Contents Dumper - heosls Heosls dumper displays the contents of HDF-EOS files. This utility provides detailed information on the POINT, SWATH, and GRID data sets. in the files. For example: it will list, the Geo-location fields, Data fields and objects. HDF-EOS ASCII Dumper - asciidmp The ASCII dump utility extracts fields from EOS data granules into plain ASCII text. The output from asciidmp should be easily human readable. With minor editing, asciidmp's output can be made ingestible by any application with ASCII import capabilities. HDF-EOS Binary Dumper - bindmp The binary dumper utility dumps HDF-EOS objects in binary format. This is useful for feeding the output of it into existing program, which does not understand HDF, for example: custom software and COTS products. HDF-EOS User Friendly Metadata - UFM The UFM utility tool is useful for viewing ECS metadata. UFM takes an EOSDIS ODL metadata file and produces an HTML report of the metadata for display using a web browser. HDF-EOS METCHECK - METCHECK METCHECK can be invoked from either Unix or Dos environment with a set of command line options that a user might use to direct the tool inputs and output . METCHECK validates the inventory metadata in (.met file) using The

  14. Beam transport

    International Nuclear Information System (INIS)

    1988-01-01

    Considerable experience has now been gained with the various beam transport lines, and a number of minor changes have been made to improve the ease of operation. These include: replacement of certain little-used slits by profile monitors (harps or scanners); relocation of steering magnets, closer to diagnostic harps or profile scanners; installation of a scanner inside the isocentric neutron therapy system; and conversion of a 2-doublet quadrupole telescope (on the neutron therapy beamline) to a 2-triplet telescope. The beam-swinger project has been delayed by very late delivery of the magnet iron to the manufacturer, but is now progressing smoothly. The K=600 spectrometer magnets have now been delivered and are being assembled for field mapping. The x,y-table with its associated mapping equipment is complete, together with the driver software. One of the experimental areas has been dedicated to the production of collimated neutron beams and has been equipped with a bending magnet and beam dump, together with steel collimators fixed at 4 degrees intervals from 0 degrees to 16 degrees. Changes to the target cooling and shielding system for isotope production have led to a request for much smaller beam spot sizes on target, and preparations have been made for rearrangement of the isotope beamline to permit installation of quadrupole triplets on the three beamlines after the switching magnet. A practical system of quadrupoles for matching beam properties to the spectrometer has been designed. 6 figs

  15. RHIC beam loss monitor system design

    International Nuclear Information System (INIS)

    Witkover, R.; Zitvogel, E.; Michnoff, R.

    1997-01-01

    The Beam Loss Monitor (BLM) System is designed to prevent the quenching of RHIC magnets due to beam loss, provide quantitative loss data, and the loss history in the event of a beam abort. The system uses 400 ion chambers of a modified Tevatron design. To satisfy fast (single turn) and slow (100 msec) loss beam criteria and provide sensitivity for studies measurements, a range of over 8 decades is needed. An RC pre-integrator reduces the dynamic range for a low current amplifier. This is digitized for data logging. The output is also applied to an analog multiplier which compensates the energy dependence, extending the range of the abort comparators. High and low pass filters separate the signal to dual comparators with independent programmable trip levels. Up to 64 channels, on 8 VME boards, are controlled by a micro-controller based VME module, decoupling it from the front-end computer (FEC) for real-time operation. Results with the detectors in the RHIC Sextant Test and the electronics in the AGS-to-RHIC (AtR) transfer line will be presented

  16. A Beam Quality Monitor for LHC Beams in the SPS

    CERN Document Server

    Papotti, G

    2008-01-01

    The SPS Beam Quality Monitor (BQM) system monitors the longitudinal parameters of the beam before extraction to the LHC to prevent losses and degradation of the LHC luminosity by the injection of low quality beams. It is implemented in two priority levels. At the highest level the SPS-LHC synchronization and global beam structure are verified. If the specifications are not met, the beam should be dumped in the SPS before extraction. On the second level, individual bunch position, length and stability are checked for beam quality assessment. Tolerances are adapted to the mode of operation and extraction to the LHC can also be inhibited. Beam parameters are accessed by acquiring bunch profiles with a longitudinal pick up and fast digital oscilloscope. The beam is monitored for instabilities during the acceleration cycle and thoroughly checked a few ms before extraction for a final decision on extraction interlock. Dedicated hardware and software components implementing fast algorithms are required. In this pape...

  17. Molecular-beam epitaxial growth and ion-beam analysis systems for functional materials research

    International Nuclear Information System (INIS)

    Takeshita, H.; Aoki, Y.; Yamamoto, S.; Naramoto, H.

    1992-01-01

    Experimental systems for molecular beam epitaxial growth and ion beam analysis have been designed and constructed for the research of inorganic functional materials such as thin films and superlattices. (author)

  18. Beam diagnostics and data acquisition system for ion beam transport line used in applied research

    International Nuclear Information System (INIS)

    Skuratov, V.A.; Didyk, A.Yu.; Arkhipov, A.V.; Illes, A.; Bodnar, K.; Illes, Z.; Havancsak, K.

    1999-01-01

    Ion beam transport line for applied research on U-400 cyclotron, beam diagnostics and data acquisition system for condensed matter studies are described. The main features of Windows-based real time program are considered

  19. Extracted-beam-detection system around synchrotron saturne

    International Nuclear Information System (INIS)

    Anne, Remy; Milleret, Gerard; Giuliani, Arlette; Lefol, Andre; Perret, Robert; Poupard, Joseph; Trogno, Andre; Van den Bossche, Maurice; N'Guyen Sieu Viet.

    1977-07-01

    The extracted-beam-detection system working around the synchrotron Saturne is presented. The whole system is composed of about forty multiwire chambers used for beam tuning and providing beams profiles. Optic beam parameters such as position, divergence, dimension, emittance can be easily measured, or calculated with a program running on a computer. They are working in large range intensity beams (10 2 to 5.10 11 p/cm 2 /s of protons, alpha particles, deutons, pions, tritons and electrons [fr

  20. Beam dynamics in the SLC final focus system

    International Nuclear Information System (INIS)

    Bambade, P.S.

    1987-06-01

    The SLC luminosity is reached by colliding beams focused to about 2 μm transverse sizes. The Final Focus System (FFS) must enable, beyond its basic optical design, the detection and correction of errors accumulated in the system. In this paper, after summarizing the design, we review the sensitivity to such errors and the ability to correct them. The overall tuning strategy involves three phases: single beam spot minimization, steering the beams in collision and luminosity optimization with beam-beam effects

  1. Protection against Accidental Beam Losses at the LHC

    CERN Document Server

    Wenninger, Jörg

    2005-01-01

    Protection of the LHC against uncontrolled beam losses is of prime importance due to the very high stored beam energy. For nominal beam intensities, each of the two 7 TeV/c proton beams has a stored energy of 360 MJ threatening to damage accelerator equipment. At injection a number of passive beam absorbers must be correctly positioned and specific procedures have been proposed to ensure safe injection of high intensity. The LHC beam dump block being the only LHC element that can safety absorb the full LHC beam, it is essential that the beams are extracted unto the dump block in case of emergency. The failure time constants extend from 100 microseconds to few seconds depending on the equipment. Failures must be detected at a sufficiently early stage and transmitted to the beam interlock system that triggers the beam dumping system. To ensure safe operation the machine protection system uses a variety of systems to detect such failures. The strategy for protection of the LHC will be illustrated, with emphasis ...

  2. Building 65 Hydraulic Systems Handbook: Components, Systems, and Applications

    Science.gov (United States)

    2016-04-01

    Dump Buttons OVERVIEW Pump Dump Buttons...hydraulic system? There are different types of dump buttons that control a hierarchy of flow paths. Some dump buttons are used to shut down a pump ...that branch. The use of this dump button is preferred over the Pump Dump Button when possible. Test Site Dump

  3. Colliding beam fusion reactor space propulsion system

    International Nuclear Information System (INIS)

    Wessel, Frank J.; Binderbauer, Michl W.; Rostoker, Norman; Rahman, Hafiz Ur; O'Toole, Joseph

    2000-01-01

    We describe a space propulsion system based on the Colliding Beam Fusion Reactor (CBFR). The CBFR is a high-beta, field-reversed, magnetic configuration with ion energies in the range of hundreds of keV. Repetitively-pulsed ion beams sustain the plasma distribution and provide current drive. The confinement physics is based on the Vlasov-Maxwell equation, including a Fokker Planck collision operator and all sources and sinks for energy and particle flow. The mean azimuthal velocities and temperatures of the fuel ion species are equal and the plasma current is unneutralized by the electrons. The resulting distribution functions are thermal in a moving frame of reference. The ion gyro-orbit radius is comparable to the dimensions of the confinement system, hence classical transport of the particles and energy is expected and the device is scaleable. We have analyzed the design over a range of 10 6 -10 9 Watts of output power (0.15-150 Newtons thrust) with a specific impulse of, I sp ∼10 6 sec. A 50 MW propulsion system might involve the following parameters: 4-meters diameterx10-meters length, magnetic field ∼7 Tesla, ion beam current ∼10 A, and fuels of either D-He 3 ,P-B 11 ,P-Li 6 ,D-Li 6 , etc

  4. Study of electric phenomena in energy dumping of LCT coil

    International Nuclear Information System (INIS)

    Oka, Koichi; Tsuji, Hiroshi; Nishi, Masataka; Shimamoto, Susumu

    1980-03-01

    In IEA-LCT coil, electric phenomena in energy dumping were studied analytically and experimentally. Protection resistance of the Japanese LCT coil is chosen as 0.1 Ω considering the quenching voltage, so that temperature rise of the coil is no problem. Energy dumping characteristic of the six-coil system is calculated under different conditions. It is concluded that simultaneous dumping of all the coils with the equivalent resistance values of protection is necessary. Flashover voltage tests of the model in 4.2 K liquid helium, 4.2 K gas helium and 4.2 K boiling helium show margin in practical quenching voltage of the coil. (author)

  5. Neutral Beam Power System for TPX

    International Nuclear Information System (INIS)

    Ramakrishnan, S.; Bowen, O.N.; O'Conner, T.; Edwards, J.; Fromm, N.; Hatcher, R.; Newman, R.; Rossi, G.; Stevenson, T.; von Halle, A.

    1993-01-01

    The Tokamak Physics Experiment (TPX) will utilize to the maximum extent the existing Tokamak Fusion Test Reactor (TFTR) equipment and facilities. This is particularly true for the TFTR Neutral Beam (NB) system. Most of the NB hardware, plant facilities, auxiliary sub-systems, power systems, service infrastructure, and control systems can be used as is. The major changes in the NB hardware are driven by the new operating duty cycle. The TFTR Neutral Beam was designed for operation of the Sources for 2 seconds every 150 seconds. The TPX requires operation for 1000 seconds every 4500 seconds. During the Conceptual Design Phase of TPX every component of the TFTR NB Electrical Power System was analyzed to verify whether the equipment can meet the new operational requirements with our without modifications. The Power System converts 13.8 kV prime power to controlled pulsed power required at the NB sources. The major equipment involved are circuit breakers, auto and rectifier transformers surge suppression components, power tetrodes, HV Decks, and HVDC power transmission to sources. Thermal models were developed for the power transformers to simulate the new operational requirements. Heat runs were conducted for the power tetrodes to verify capability. Other components were analyzed to verify their thermal limitations. This paper describes the details of the evaluation and redesign of the electrical power system components to meet the TPX operational requirements

  6. Contrastive Analysis and Research on Negative Pressure Beam Tube System and Positive Pressure Beam Tube System for Mine Use

    Science.gov (United States)

    Wang, Xinyi; Shen, Jialong; Liu, Xinbo

    2018-01-01

    Against the technical defects of universally applicable beam tube monitoring system at present, such as air suction in the beam tube, line clogging, long sampling time, etc., the paper analyzes the current situation of the spontaneous combustion fire disaster forecast of mine in our country and these defects one by one. On this basis, the paper proposes a research thought that improving the positive pressure beam tube so as to substitute the negative pressure beam tube. Then, the paper introduces the beam tube monitoring system based on positive pressure technology through theoretical analysis and experiment. In the comparison with negative pressure beam tube, the paper concludes the advantage of the new system and draws the conclusion that the positive pressure beam tube is superior to the negative pressure beam tube system both in test result and test time. At last, the paper proposes prospect of the beam tube monitoring system based on positive pressure technology.

  7. Beam-plasma instability in ion beam systems used in neutral beam generation

    International Nuclear Information System (INIS)

    Hooper, E.B. Jr.

    1977-02-01

    The beam-plasma instability is analyzed for the ion beams used for neutral beam generation. Both positive and negative ion beams are considered. Stability is predicted when the beam velocity is less than the electron thermal velocity; the only exception occurs when the electron density accompanying a negative ion beam is less than the ion density by nearly the ratio of electron to ion masses. For cases in which the beam velocity is greater than the electron thermal velocity, instability is predicted near the electron plasma frequency

  8. Electron beam producing system for very high acceleration voltages and beam powers

    International Nuclear Information System (INIS)

    Andelfinger, C.; Dommaschk, W.; Ott, W.; Ulrich, M.; Weber, G.

    1975-01-01

    An electron beam producing system for acceleration voltages on the order of megavolts and beam powers on the order of gigawatts is described. A tubular housing of insulating material is used, and adjacent to its one closed end, a field emission cathode with a large surface area is arranged, while at its other end, from which the electron beam emerges, an annular anode is arranged. The device for collimating the electron beam consists of annular electrodes. (auth)

  9. An interactive beam position monitor system simulator

    International Nuclear Information System (INIS)

    Ryan, W.A.; Shea, T.J.

    1993-03-01

    A system simulator has been implemented to aid the development of the RHIC position monitor system. Based on the LabVIEW software package by National Instruments, this simulator allows engineers and technicians to interactively explore the parameter space of a system during the design phase. Adjustable parameters are divided into three categories: beam, pickup, and electronics. The simulator uses these parameters in simple formulas to produce results in both time-domain and frequencydomain. During the prototyping phase, these simulated results can be compared to test data acquired with the same software package. The RHIC position monitor system is presented as an example, but the software is applicable to several other systems as well

  10. Integrated cooling system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Johnson, B.; Chang, Y.

    1979-01-01

    The MFTF components that require water cooling include the neutral beam dumps, ion dumps, plasma dumps, baffle plates, magnet liners, gas boxes, streaming guns, and the neutral beam injectors. A total heat load of nearly 500 MW for 0.5 s dissipates over 4-min intervals. A steady-flow, closed-loop system is utilized. The design of the cooling system assumes that all components require cooling simultaneously. The cooling system contains process instrumentation for loop control. Alarms and safety interlocks are incorporated for the safe operation of the system

  11. Non-Linear Beam Transport System for the LENS 7 MeV Proton Beam

    CERN Document Server

    Jones, William P; Derenchuk, Vladimir Peter; Rinckel, Thomas; Solberg, Keith

    2005-01-01

    A beam transport system has been designed to carry a high-intensity low-emittance proton beam from the exit of the RFQ-DTL acceleration system of the Indiana University Low Energy Neutron System (LENS)* to the neutron production target. The goal of the design was to provide a beam of uniform density over a 3cm by 3cm area at the target. Two octupole magnets** are employed in the beam line to provide the necessary beam phase space manipulations to achieve this goal. First order calculations were done using TRANSPORT and second order calculations have been performed using TURTLE. Second order simulations have been done using both a Gaussian beam distribution and a particle set generated by calculations of beam transport through the RFQ-DTL using PARMILA. Comparison of the design characteristics with initial measurements from the LENS commissioning process will be made.

  12. Optics of ion beams for the neutral beam injection system on HL-2A Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Zou, G. Q.; Lei, G. J.; Cao, J. Y.; Duan, X. R. [Southwestern Institute of Physics, Chengdu, 610041 (China)

    2012-07-15

    The ion beam optics for the neutral beam injection system on HL-2A Tokomak is studied by two- dimensional numerical simulation program firstly, where the emitting surface is taken at 100 Debye lengths from the plasma electrode. The mathematical formulation, computation techniques are described. Typical ion orbits, equipotential contours, and emittance diagram are shown. For a fixed geometry electrode, the effect of plasma density, plasma potential and plasma electron temperature on ion beam optics is examined, and the calculation reliability is confirmed by experimental results. In order to improve ion beam optics, the application of a small pre-acceleration voltage ({approx}100 V) between the plasma electrode and the arc discharge anode is reasonable, and a lower plasma electron temperature is desired. The results allow optimization of the ion beam optics in the neutral beam injection system on HL-2A Tokomak and provide guidelines for designing future neutral beam injection system on HL-2M Tokomak.

  13. Optics of ion beams for the neutral beam injection system on HL-2A Tokamak.

    Science.gov (United States)

    Zou, G Q; Lei, G J; Cao, J Y; Duan, X R

    2012-07-01

    The ion beam optics for the neutral beam injection system on HL-2A Tokomak is studied by two- dimensional numerical simulation program firstly, where the emitting surface is taken at 100 Debye lengths from the plasma electrode. The mathematical formulation, computation techniques are described. Typical ion orbits, equipotential contours, and emittance diagram are shown. For a fixed geometry electrode, the effect of plasma density, plasma potential and plasma electron temperature on ion beam optics is examined, and the calculation reliability is confirmed by experimental results. In order to improve ion beam optics, the application of a small pre-acceleration voltage (∼100 V) between the plasma electrode and the arc discharge anode is reasonable, and a lower plasma electron temperature is desired. The results allow optimization of the ion beam optics in the neutral beam injection system on HL-2A Tokomak and provide guidelines for designing future neutral beam injection system on HL-2M Tokomak.

  14. Studies on the beam system for the calibration of the OPAL jet chamber with laser beams

    International Nuclear Information System (INIS)

    Maringer, G.

    1988-07-01

    UV laser beams are an important tool for the calibration of the OPAL jet chamber. A beam transport system containing about 350 mirrors in total guides the beams from the laser outside the detector into the chamber. Four of the mirrors are moveable under remote control allowing to guide the beams into each of the 24 sectors and to correct the beam path in case of deviations. A program to control these moveable mirrors has been developed. Drift velocity measurements will be performed by means of double beams which are generated by appropriate beamsplitters. Accurate knowledge of the double beam distances is essential to obtain the desired accuracy of better than 0.1% or 10 μm. Using a CCD device with a pixel size of 23x23 μm 2 the beam distance could be measured with errors below the required limit. (orig.)

  15. A beam position feedback system for beam lines at the photon factory

    International Nuclear Information System (INIS)

    Katsura, T.; Kamiya, Y.; Haga, K.; Mitsuhashi, T.

    1987-01-01

    The beam position of the synchrotron radiation produced from the Storage Ring was stabilized by a twofold position feedback system. A digital feedback system was developed to suppress the diurnal beam movement (one cycle of sin-like drifting motion per day) which became a serious problem in low-emittance operation. The feedback was applied to the closed-orbit-distortion (COD) correction system in order to cancel the position variation at all the beam lines proportionately to the variation monitored at one beam line. An analog feedback system is also used to suppress frequency components faster than the slow diurnal movement

  16. TFTR neutral-beam power system

    International Nuclear Information System (INIS)

    Winje, R.A.

    1982-10-01

    The TFTR Neutral Beam Power System (NBPS) consists of the accelerator grid power supply and the auxiliary power supplies required to operate the TFTR 120-keV ion sources. The current configuration of the NBPS including the 11-MVA accelerator grid power supply and the Arc and Filament power supplies isolated for operation at accelerator grid voltages up to 120 kV, is described. The prototype NBPS has been assembled at the Princeton Plasma Physics Laboratory and has been operated. The results of the initial operation and the description and resolution of some of the technical problems encountered during the commissioning tests are presented

  17. Real-time beam profile imaging system for actinotherapy accelerator

    International Nuclear Information System (INIS)

    Lin Yong; Wang Jingjin; Song Zheng; Zheng Putang; Wang Jianguo

    2003-01-01

    This paper describes a real-time beam profile imaging system for actinotheraphy accelerator. With the flash X-ray imager and the technique of digital image processing, a real-time 3-dimension dosage image is created from the intensity profile of the accelerator beam in real time. This system helps to obtain all the physical characters of the beam in any section plane, such as FWHM, penumbra, peak value, symmetry and homogeneity. This system has been used to acquire a 3-dimension dosage distribution of dynamic wedge modulator and the transient process of beam dosage. The system configure and the tested beam profile images are also presented

  18. Electron beam accelerator energy control system

    International Nuclear Information System (INIS)

    Sharma, Vijay; Rajan, Rehim; Acharya, S.; Mittal, K.C.

    2011-01-01

    A control system has been developed for the energy control of the electron beam accelerator using PLC. The accelerating voltage of 3 MV has been obtained by using parallel coupled voltage multiplier circuit. A autotransformer controlled variable 0-10 KV DC is fed to a tube based push pull oscillator to generate 120 Khz, 10 KV AC. Oscillator output voltage is stepped up to 0-300 KV/AC using a transformer. 0-300 KVAC is fed to the voltage multiplier column to generate the accelerating voltage at the dome 0-3 MV/DC. The control system has been designed to maintain the accelerator voltage same throughout the operation by adjusting the input voltage in close loop. Whenever there is any change in the output voltage either because of beam loading or arcing in the accelerator. The instantaneous accelerator voltage or energy is a direct proportional to 0-10 KVDC obtained from autotransformer. A PLC based control system with user settable energy level has been installed for 3 MeV, EB accelerator. The PLC takes the user defined energy value through a touch screen and compares it to the actual accelerating voltage (obtained using resistive divider). Depending upon the error the PLC generates the pulses to adjust the autotransformer to bring the actual voltage to the set value within the window of error (presently set to +/- 0.1%). (author)

  19. The neutron beam users tape management system

    International Nuclear Information System (INIS)

    Lyall, B.; Johnson, M.W.

    1977-02-01

    Systems are described for dealing with data collected at the High Flux Reactor, Institut Laue-Langevin, Grenoble and brought on magnetic tape to the Neutron Beam Research Unit at the Rutherford Laboratory. The first system, named GNAT, was designed to archive the incoming 800 bpi tapes onto 6250 bpi tapes (to enable them to return to the ILL). The archiving program, besides choosing the archive tapes, keeping a record of the data sets archived, and writing the archive tape, should be able to cope with incoming tapes whose formats are somewhat different from the standard IBM format. The second system, named FONT, was designed to maintain a record of all the tapes in the NBRU's possession, their whereabouts and what data, if any, are on them. (U.K.)

  20. Beam-Forming Concentrating Solar Thermal Array Power Systems

    Science.gov (United States)

    Cwik, Thomas A. (Inventor); Dimotakis, Paul E. (Inventor); Hoppe, Daniel J. (Inventor)

    2016-01-01

    The present invention relates to concentrating solar-power systems and, more particularly, beam-forming concentrating solar thermal array power systems. A solar thermal array power system is provided, including a plurality of solar concentrators arranged in pods. Each solar concentrator includes a solar collector, one or more beam-forming elements, and one or more beam-steering elements. The solar collector is dimensioned to collect and divert incoming rays of sunlight. The beam-forming elements intercept the diverted rays of sunlight, and are shaped to concentrate the rays of sunlight into a beam. The steering elements are shaped, dimensioned, positioned, and/or oriented to deflect the beam toward a beam output path. The beams from the concentrators are converted to heat at a receiver, and the heat may be temporarily stored or directly used to generate electricity.

  1. New data acquisition system for beam loss monitor used in J-PARC main ring

    Science.gov (United States)

    Satou, K.; Toyama, T.; Kamikubota, N.; Yoshida, S.; Matsushita, J.; Wakita, T.; Sugiyama, M.; Morino, T.

    2018-04-01

    A new data acquisition system has been developed continually as a part of the development of a new beam loss monitor (BLM) system for the J-PARC main ring. This development includes a newly designed front-end isolation amp that uses photo-couplers and a VME-based new analog-to-digital converter (ADC) system. Compared to the old amp, the new amp has a 10 times higher conversion impedance for the input current to the output voltage; this value is 1 M Ω. Moreover, the bandwidth was improved to from DC to 50 kHz, which is about two orders of magnitude greater than the previously used bandwidth. The theoretical estimations made in this study roughly agree with the frequency response obtained for the new system. The new ADC system uses an on-board field-programmable gate array chip for signal processing. By replacing the firmware of this chip, changes pertaining to future accelerator upgrade plans may be introduced into the new ADC system; in addition, the ADC system can be used in other applications. The sampling speed of the system is 1 MS/s, and it exhibits a 95 dBc spurious-free dynamic range and 16.5 effective number of bits. The obtained waveform and integrated charge data are compared with two reference levels in the ADC system. If the data exceeds the reference level, the system generates an alarm to dump the beams. By using the new data acquisition system, it was proved that the new BLM system shows a wide dynamic range of 160 dB. In this study, the details of the new data acquisition system are described.

  2. The new 0.5 ohm, 60 kA beam dumping system under test in the laboratory

    CERN Multimedia

    1974-01-01

    In the foreground are the four ultra-high-vacuum tanks which house the deflection structure. In the background are the thirty 15 ohm high-voltage cables that connect the six pulse-forming networks to the spark gap and to the UHV tanks.

  3. The Saturne beam measurement system for orbit corrections and high and low intensity beam acceleration

    International Nuclear Information System (INIS)

    Degueurce, L.; Nakach, A.; Sole, J.

    1980-07-01

    This paper summarizes the dipolar and multipolar correction system and the main beam diagnostics of Saturne II: wide-band RF electrostatic pick-up electrode for observation of bunches, beam position and tune measurement systems, special electrodes for observation of emittance blow-up when particles cross a resonance line. For low intensity beams, special electrodes and electronics have been developed. All this instrumentation is computer controlled

  4. Transformation instability of oscillations in inhomogeneous beam-plasma system

    International Nuclear Information System (INIS)

    Kitsenko, A.B.

    1985-01-01

    Wave transformation is studied in a plasma system which was weak-inhomogeneous along beam velocity, in absence of external magnetic field. For the case of small density beam formulae are obtained which have set a coupling between the charge density beam wave amplitudes and the Langmuir wave on both sides of transformation point. It is shown that in collisionless plasma the wave production is a cause of the absorption of the charge density beam waves. Transformation mechanism of the absolute instability in the weak-inhomogeneous beam-plasma system is revealed

  5. Fast pulse beam generation systems for electron accelerators

    International Nuclear Information System (INIS)

    Koontz, R.F.

    1977-01-01

    The fast pulse beam generation system to supply the SLAC storage ring, SPEAR, by the two one nanosecond bunch electron beam pulses is described. Generation of these pulses is accomplished with a combination of a fast pulsed grided gun and a synchronized transverse beam chopper. Fast gun based on spherical cathode-grid assembly has output current up to 2As. Fast pulse amplifier system can handle trains of short pulses with repetition rates up to 40 MHz during the 1.6 μs normal accelerating time. Chopping deflector system consists of a resonant coaxial line with the deflecting plates. The resonator frequency is 39.667 MHz. A schematic diagram of the resonant system is shown. The fast beam pickup system has a one hundred picosecond rise time overrall. Fast beam generation and chopper systems permit to generate almost any short or single bunch beam profile needed for experiments

  6. Sea dumping of hazardous wastes

    International Nuclear Information System (INIS)

    Thomas, J.

    1980-01-01

    From 1967 until 1976 ca. 45,000 t of weak radioactive wastes had been dumped into the sea during several actions under the supervision of the NEA. The requirements to be deduced from the experiences with regard to marine areas, packaging and transports of the wastes are described. Up to now the possibilities of the sea dumping of strong radioactive wastes has been just discussed. The natural removal of the decay heat by sea water would be advantageous but the problem of water-proof packagings for the period of 1000 years have not been solved yet. (orig.) [de

  7. A review of JAERI R and D activities on the negative-ion-based neutral beam injection system

    International Nuclear Information System (INIS)

    Ohara, Yoshihiro; Akiba, Masato; Araki, Masanori

    1990-08-01

    R and D efforts to realize a negative-ion-based neutral beam injection system have been made intensively at JAERI for the past several years. Concerning a high current negative ion source which is one of the most important R and D items, a 10 A, 50 keV negative hydrogen ion beam has been produced successfully. The negative ion beam current and the current density correspond already to the value required for the negative-ion-based NBI system. In order to increase the beam energy further, a 350 keV, 0.1 A test stand has been constructed, and the test of a high energy negative ion accelerator has started. Concerning a high energy acceleration power supply, an inverter type power supply which has a high speed AC switch was proposed and applied to the 100 kV, 5 A power supply for JAERI Electron Beam Irradiation Stand. The reliable operation indicates that the concept of this system can be applied for a MV class acceleration power supply. As one of the promising candidates for a beam dump cooling element, an externally-finned swirl tube was proposed and tested to have a high burnout heat flux of 4.1 kW/cm 2 , which is high enough for the next NBI system. The R and Ds on the negative-ion-based NBI system have made great progress at JAERI in recent years. The construction of a 500 keV class NBI system has become realistic from the engineering point of view. (author)

  8. A beam sweeping system for the Fermilab antiproton production target

    International Nuclear Information System (INIS)

    Bieniosek, F.M.

    1993-08-01

    In the Main Injector era beam intensities high enough to damage the antiproton production target will be available. In order to continue to operate with a tightly-focused primary beam spot on the target, and thus maintain yield, it will be necessary to spread the hot spot on the target by use of a beam sweeping system. This report summarizes the requirements for such a system, and addresses the issues involved in the design of a sweeping system

  9. Nonlinear wave-beam kinetic equilibrium in decelerating systems

    International Nuclear Information System (INIS)

    Grishin, V.K.; Shaposhnikova, E.N.

    1981-01-01

    The equilibrium state of the wave-beam system arising during the interaction of a particle beam and excited electromagnetic wave has been investigated on the basis of the analysis of the exact polution of a non-linear self-consistent linear equation using the complete system of conservation laws. A waveguide with a dielectric filler, into which a monoenergetic particle beam magnetized in a transverse plane is continuously injected, is used as a model of an decelerating system. A dispersion equation describing the system state and expression for the evaluation of efficiency of the beam energy conversion to the field energy have been obtained. It is concluded that larae fields and high efficiency of energy conversion are achieved during the marked beam reconstruction. States with different values of current and beam velocity but similar amplitudes of a longitudinal field are possible in the system considered [ru

  10. An elementary presentation of the PS ''beam control'' system

    International Nuclear Information System (INIS)

    Boussard, D.

    1973-01-01

    The PS synchrotron control system is explained in general terms, covering the topics of frequency control, beam transfer, damping, stability, conservation of longitudinal emittance, and second order problems

  11. Development of a focused ion beam micromachining system

    Energy Technology Data Exchange (ETDEWEB)

    Pellerin, J.G.; Griffis, D.; Russell, P.E.

    1988-12-01

    Focused ion beams are currently being investigated for many submicron fabrication and analytical purposes. An FIB micromachining system consisting of a UHV vacuum system, a liquid metal ion gun, and a control and data acquisition computer has been constructed. This system is being used to develop nanofabrication and nanomachining techniques involving focused ion beams and scanning tunneling microscopes.

  12. TRANSIENT BEAM LOADING EFFECTS IN RF SYSTEMS IN JLEIC

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Haipeng [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Guo, Jiquan [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Rimmer, Robert A. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Wang, Shaoheng [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2016-05-01

    The pulsed electron bunch trains generated from the Continuous Electron Beam Accelerator Facility (CEBAF) linac to inject into the proposed Jefferson Lab Electron Ion Collider (JLEIC) e-ring will produce transient beam loading effects in the Superconducting Radio Frequency (SRF) systems that, if not mitigated, could cause unacceptably large beam energy deviation in the injection capture, or exceed the energy acceptance of CEBAF’s recirculating arcs. In the electron storage ring, the beam abort or ion clearing gaps or uneven bucket filling can cause large beam phase transients in the (S)RF cavity control systems and even beam loss due to Robinson instability. We have first analysed the beam stability criteria in steady state and estimated the transient effect in Feedforward and Feedback RF controls. Initial analytical models for these effects are shown for the design of the JLEIC e-ring from 3GeV to 12GeV.

  13. Development of focused ion beam systems with various ion species

    International Nuclear Information System (INIS)

    Ji Qing; Leung, K.-N.; King, Tsu-Jae; Jiang Ximan; Appleton, Bill R.

    2005-01-01

    Conventional focused ion beam systems employ a liquid-metal ion source (LMIS) to generate high-brightness beams, such as Ga + beams. Recently there has been an increased need for focused ion beams in areas like biological studies, advanced magnetic-film manufacturing and secondary-ion mass spectroscopy (SIMS). In this article, status of development on focused ion beam systems with ion species such as O 2 + , P + , and B + will be reviewed. Compact columns for forming focused ion beams from low energy (∼3keV), to intermediate energy (∼35keV) are discussed. By using focused ion beams, a SOI MOSFET is fabricated entirely without any masks or resist

  14. Advanced neutral-beam technology

    International Nuclear Information System (INIS)

    Berkner, K.H.

    1980-09-01

    Extensive development will be required to achieve the 50- to 75-MW, 175- to 200-keV, 5- to 10-sec pulses of deuterium atoms envisioned for ETF and INTOR. Multi-megawatt injector systems are large (and expansive); they consist of large vacuum tanks with many square meters of cryogenic pumping panels, beam dumps capable of dissipating several megawatts of un-neutralized beam, bending magnets, electrical power systems capable of fast turnoff with low (capacity) stored energy, and, of course, the injector modules (ion sources and accelerators). The technology requirements associated with these components are described

  15. Beam stability in synchrotrons with digital transverse feedback systems in dependence on beam tunes

    International Nuclear Information System (INIS)

    Zhabitskij, V.M.

    2011-01-01

    The beam stability problem in synchrotrons with a digital transverse feedback system (TFS) is studied. The TFS damper kicker (DK) corrects the transverse momentum of a bunch in proportion to its displacement from the closed orbit measured at the location of the beam position monitor (BPM). It is shown that the area and configuration of the beam stability separatrix depend on the beam tune, the feedback gain, the phase balance between the phase advance from BPM to DK and the phase response of the feedback chain at the betatron frequency

  16. High precision electron beam diagnostic system for high current long pulse beams

    International Nuclear Information System (INIS)

    Chen, Y J; Fessenden, T; Holmes, C; Nelson, S D; Selchow, N.

    1999-01-01

    As part of the effort to develop a multi-axis electron beam transport system using stripline kicker technology for DARHT II applications, it is necessary to precisely determine the position and extent of long high energy beams (6-40 MeV, 1-4 kA, 2 microseconds) for accurate position control. The kicker positioning system utilizes shot-to-shot adjustments for reduction of relatively slow (<20 MHz) motion of the beam centroid. The electron beams passing through the diagnostic systems have the potential for large halo effects that tend to corrupt measurements performed using capacitive pick-off probes. Likewise, transmission line traveling wave probes have problems with multi-bounce effects due to these longer pulse widths. Finally, the high energy densities experienced in these applications distort typical foil beam position measurements

  17. Down in the dumps - cheerfully

    International Nuclear Information System (INIS)

    Ruhmer, W.T.

    1984-01-01

    Scavenging gold and uranium from the sands dumps and slimes dams is a highly profitable operation. In a few pages the author summarises some of the permutations and combinations of the various processes employed by South African concerns to achieve economic results

  18. Egg dumping by predatory insects

    Czech Academy of Sciences Publication Activity Database

    Corbani, A. C.; Ferrer, A.; Dixon, Anthony F. G.; Hemptinne, J. L.

    2011-01-01

    Roč. 36, č. 3 (2011), s. 290-293 ISSN 0307-6962 Institutional research plan: CEZ:AV0Z60870520 Keywords : Egg dumping * ladybird beetles * oocyte resorption * trophic egg Subject RIV: EH - Ecology, Behaviour Impact factor: 1.330, year: 2011

  19. Design of a negative ion neutral beam system for TNS

    International Nuclear Information System (INIS)

    Easoz, J.R.

    1978-05-01

    A conceptual design of a neutral beam line based on the neutralization of negative deuterium ions is presented. This work is a detailed design of a complete neutral beam line based on using negative ions from a direct extraction source. Anticipating major technological advancements, beam line components have been scaled including the negative ion sources and components for the direct energy recovery of charged beams and high speed cryogenic pumping. With application to the next step in experimental fusion reactors (TNS), the neutral beam injector system that has been designed provides 10 MW of 200 keV neutral deuterium atoms. Several arms are required for plasma ignition

  20. Electron cyclotron beam measurement system in the Large Helical Device

    Energy Technology Data Exchange (ETDEWEB)

    Kamio, S., E-mail: kamio@nifs.ac.jp; Takahashi, H.; Kubo, S.; Shimozuma, T.; Yoshimura, Y.; Igami, H.; Ito, S.; Kobayashi, S.; Mizuno, Y.; Okada, K.; Osakabe, M.; Mutoh, T. [National Institute for Fusion Science, Toki 509-5292 (Japan)

    2014-11-15

    In order to evaluate the electron cyclotron (EC) heating power inside the Large Helical Device vacuum vessel and to investigate the physics of the interaction between the EC beam and the plasma, a direct measurement system for the EC beam transmitted through the plasma column was developed. The system consists of an EC beam target plate, which is made of isotropic graphite and faces against the EC beam through the plasma, and an IR camera for measuring the target plate temperature increase by the transmitted EC beam. This system is applicable to the high magnetic field (up to 2.75 T) and plasma density (up to 0.8 × 10{sup 19} m{sup −3}). This system successfully evaluated the transmitted EC beam profile and the refraction.

  1. Beam-optics study of the gantry beam delivery system for light-ion cancer therapy

    International Nuclear Information System (INIS)

    Pavlovic, M.

    1995-12-01

    Ion optics considerations on the granty-like beam delivery system for light-ion cancer therapy are presented. A low-angle active beam scanning in two directions is included in the preliminary gantry design. The optical properties of several gantry modifications are discussed. (orig.)

  2. 30 CFR 77.1608 - Dumping facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Dumping facilities. 77.1608 Section 77.1608 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... Haulage § 77.1608 Dumping facilities. (a) Dumping locations and haulage roads shall be kept reasonably...

  3. Double deflection system for an electron beam device

    International Nuclear Information System (INIS)

    Parker, N.W.; Crewe, A.V.

    1978-01-01

    A double deflection scanning system for electron beam instruments is provided embodying a means of correcting isotropic coma, and anisotropic coma aberrations induced by the magnetic lens of such an instrument. The scanning system deflects the beam prior to entry into the magnetic lens from the normal on-axis intersection of the beam with the lens according to predetermined formulas and thereby reduces the aberrations

  4. Neutral-beam systems for magnetic-fusion reactors

    International Nuclear Information System (INIS)

    Fink, J.H.

    1981-01-01

    Neutral beams for magnetic fusion reactors are at an early stage of development, and require considerable effort to make them into the large, reliable, and efficient systems needed for future power plants. To optimize their performance to establish specific goals for component development, systematic analysis of the beamlines is essential. Three ion source characteristics are discussed: arc-cathode life, gas efficiency, and beam divergence, and their significance in a high-energy neutral-beam system is evaluated

  5. Alternative power supply and dump resistor connections for similar, mutually coupled, superconducting coils

    International Nuclear Information System (INIS)

    Owen, E.W.; Shimer, W.; Wang, S.T.

    1983-01-01

    Alternative methods of connecting similar mutually coupled coils to their power supplies and dump resistors are investigated. The circuits are evaluated for both operating and fault conditions. The factors considered are the voltage to ground during a dump, short circuits, open circuits, quenches, and failure of the protection system to detect a quench. Of particular interest are the currents induced in coils that remain superconducting when one or more coils quench. The alternative connections include combined power supplies, individual dump resistors, combined resistors and series and parallel dump resistors. A new circuit that contains ''coupling'' resistors is proposed. The coupling resistors do not affect normal fast dumps but reduce the peak induced currents while also reducing the energy rating of the dump resistors. Another novel circuit, the series circuit with diodes, is discussed. The MFTF-B central-cell solenoids are used as an example

  6. Alternative power supply and dump resistor connections for similar, mutally coupled, superconducting coils

    International Nuclear Information System (INIS)

    Owen, E.W.; Shimer, D.W.; Wang, S.T.

    1983-01-01

    Alternative methods of connecting similar mutually coupled coils to their power supplies and dump resistors are investigated. The circuits are evaluated for both operating and fault conditions. The factors considered are the voltage to ground during a dump, short circuits, open circuits, quenches, and failure of the protection system to detect a quench. Of particular interest are the currents induced in coils that remain superconducting when one or more coils quench. The alternative connections include combined power supplies, individual dump resistors, combined resistors and series and parallel dump resistors. A new circuit that contains coupling resistors is proposed. The coupling resistors do not affect normal fast dumps but reduce the peak induced currents while also reducing the energy rating of the dump resistors. Another novel circuit, the series circuit with diodes, is discussed. The MFTF-B central-cell solenoids are used as an example

  7. Beam transport design for a recirculating-linac FEL driver

    International Nuclear Information System (INIS)

    Neuffer, D.; Douglas, D.; Li, Z.; Cornacchia, M.; Garren, A.

    1996-01-01

    The beam transport system for the CEBAF Industrial FEL includes a two-pass transport of the beam with acceleration from injector to wiggler, followed by energy recovery transport from wiggler to dump. From that context, the authors discuss the general problem of multi-pass energy-recovery beam transport for FELs. Tunable, nearly-isochronous, large-momentum-acceptance transport systems are required. The entire transport must preserve beam quality, particularly in the acceleration transport to the wiggler, and have low losses throughout the entire system. Various possible designs are presented, and results of dynamic analyses are discussed

  8. The SPL-based Neutrino Super Beam

    CERN Document Server

    Baussan, E; Bobeth, C; Bouquerel, E; Caretta, O; Cupial, P; Davenne, T; Densham, C; Dracos, M; Fitton, M; Gaudiot, G; Kozien, M; Lacny, L; Lepers, B; Longhin, A; Loveridge, P; Osswald, F; Poussot, P; Rooney, M; Skoczen, B; Szybinski, B; Ustrzycka, A; Vassilopoulos, N; Wilcox, D; Wroblewski, A; Wurtz, J; Zeter, V; Zito, M

    2012-01-01

    The EUROnu Super Beam work package has studied a neutrino beam based on SPL at CERN and aimed at MEMPHYS, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane (Fr\\'ejus tunnel, France), with a baseline of 130 km. The aim of this proposed experiment is to study the CP violation in the neutrino sector. In the study reported here, we have developed the conceptual design of the neutrino beam, especially the target and the magnetic focusing device. Indeed, this beam present several unprecedented challenges, like the high primary proton beam power (4 MW), the high repetition rate (50 Hz) and the low energy of the protons (4.5 GeV). The design is completed by a study of all the main component of the system, starting from the transport system to guide the beam to the target up to the beam dump.

  9. Experimental study on beam for composite CES structural system

    Science.gov (United States)

    Matsui, Tomoya

    2017-10-01

    Development study on Concrete Encase Steel (CES) composite structure system has been continuously conducted toward the practical use. CES structure is composed of steel and fiber reinforced concrete. In previous study, it was found that CES structure has good seismic performance from experimental study of columns, beam - column joints, shear walls and a two story two span frame. However, as fundamental study on CES beam could be lacking, it is necessary to understand the structural performance of CES beam. In this study, static loading tests of CES beams were conducted with experimental valuable of steel size, the presence or absence of slab and thickness of slab. And restoring characteristics, failure behavior, deformation behavior, and strength evaluation method of CES beam were investigated. As the results, it was found that CES beam showed stable hysteresis behavior. Furthermore it was found that the flexural strength of the CES beam could be evaluated by superposition strength theory.

  10. Electron gun design study for the IUCF beam cooling system

    International Nuclear Information System (INIS)

    Friesel, D.L.; Ellison, T.; Jones, W.P.

    1985-01-01

    The design of a low temperature electron beam cooling system for the Indiana University electron-cooled storage ring is in progress. The storage ring, which will accept the light ion beams from the existing k=200, multi-stage cyclotron facility, requires an electron beam variable in energy from about 7 to 275 keV. The electron beam system consists of a high perveance electron gun with Pierce geometry and a flat cathode. The gun and a 28 element accelerating column are immersed in a uniform longitudinal magnetic guide field. A computer modeling study of the system was conducted to determine electron beam density and transverse temperature variations as a function of anode region and accelerator column design parameters. Transverse electron beam temperatures (E /SUB t/ = mc 2 β 2 γ(/theta/ /SUB H/ +/theta/ /SUB v/ )) of less than a few tenths of an electron volt at a maximum current density of 0.4 A/cm 2 are desired over the full energy range. This was achieved in the calculations without the use of resonant focusing for a 2 Amp, 275 keV electron beam. Some systematics of the electron beam temperature variations with system design parameters are presented. A short discussion of the mechanical design of the proposed electron beam system is also given

  11. NSRL 200 MeV linac beam energy stabilization system

    International Nuclear Information System (INIS)

    Huang Guirong; Pei Yuanji; Dong Sai

    2001-01-01

    By using the computer image processing technology and RF phase auto-shifting system, the ESS (Energy Stabilization System) was applied to 200 MeV Linac. the ESS adjusts beam energy automatically in a range of +-4 MeV. After adjustment beam energy stability is improved to +-6%

  12. System for combining laser beams of diverse frequencies

    International Nuclear Information System (INIS)

    1980-01-01

    A system is described for combining laser beams of different frequencies into a number of beams each comprising laser radiation having components of each of the different frequencies. The system can be used in laser isotope separation facilities. (U.K.)

  13. LHC Report: Beam on

    CERN Multimedia

    Rossano Giachino for the LHC Team

    2012-01-01

    The powering tests described in the last edition of the Bulletin were successfully finished at the end of the first week of March opening the way for 4 TeV operations this year. The beam was back in the machine on Wednesday 14 March. The first collisions at 4 TeV are scheduled for the first week of April.   The first beam of 2012 is dumped after making a few rounds in the LHC. The magnet powering tests were followed by the machine checkout phase. Here the operations team in collaboration with the equipment groups performs a sequence of tests to ensure the readiness of the LHC for beam. The tests include driving all the LHC systemsbeam dump, injection, collimation, RF, power converters, magnet circuits, vacuum, interlocks, controls, timing and synchronization – through the operational cycle. The “checkout phase” is really a massive de-bugging exercise, which is performed with the objective of ensuring the proper functioning of the whole machine and t...

  14. EU Lobbying and Anti-Dumping Policy

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Ulff-Møller; Svendsen, Gert Tinggaard

    2012-01-01

    of petitioning firms and Council voting in the case of anti-dumping policy. If the political position of countries in anti-dumping cases is influenced by domestic lobbying efforts, we expect that the empirical pattern of country distribution of petitioning firms in EU anti-dumping cases corresponds closely...... to the empirical pattern of EU country distribution in Council voting. Our results show a low petitioning intensity for anti-dumping investigations and a high voting intensity against anti-dumping measures in Northern Europe. Thus, it seems likely that domestic lobbying efforts have influenced the political...

  15. A gamma beam profile imager for ELI-NP Gamma Beam System

    Science.gov (United States)

    Cardarelli, P.; Paternò, G.; Di Domenico, G.; Consoli, E.; Marziani, M.; Andreotti, M.; Evangelisti, F.; Squerzanti, S.; Gambaccini, M.; Albergo, S.; Cappello, G.; Tricomi, A.; Veltri, M.; Adriani, O.; Borgheresi, R.; Graziani, G.; Passaleva, G.; Serban, A.; Starodubtsev, O.; Variola, A.; Palumbo, L.

    2018-06-01

    The Gamma Beam System of ELI-Nuclear Physics is a high brilliance monochromatic gamma source based on the inverse Compton interaction between an intense high power laser and a bright electron beam with tunable energy. The source, currently being assembled in Magurele (Romania), is designed to provide a beam with tunable average energy ranging from 0.2 to 19.5 MeV, rms energy bandwidth down to 0.5% and flux of about 108 photons/s. The system includes a set of detectors for the diagnostic and complete characterization of the gamma beam. To evaluate the spatial distribution of the beam a gamma beam profile imager is required. For this purpose, a detector based on a scintillator target coupled to a CCD camera was designed and a prototype was tested at INFN-Ferrara laboratories. A set of analytical calculations and Monte Carlo simulations were carried out to optimize the imager design and evaluate the performance expected with ELI-NP gamma beam. In this work the design of the imager is described in detail, as well as the simulation tools used and the results obtained. The simulation parameters were tuned and cross-checked with the experimental measurements carried out on the assembled prototype using the beam from an x-ray tube.

  16. Data acquisition system for medium power neutral beam test facility

    International Nuclear Information System (INIS)

    Stewart, C.R. Jr.; Francis, J.E. Jr.; Hammons, C.E.; Dagenhart, W.K.

    1978-06-01

    The Medium Power Neutral Beam Test Facility at Oak Ridge National Laboratory was constructed in order to develop, test, and condition powerful neutral beam lines for the Princeton Large Torus experiment at Princeton Plasma Physics Laboratory. The data acquisition system for the test stand monitors source performance, beam characteristics, and power deposition profiles to determine if the beam line is operating up to its design specifications. The speed of the computer system is utilized to provide near-real-time analysis of experimental data. Analysis of the data is presented as numerical tabulation and graphic display

  17. Data acquisition system for PLT Neutral Beam Test Stand

    International Nuclear Information System (INIS)

    Francis, J.E. Jr.; Hammons, C.E.

    1977-01-01

    The PLT Neutral Beam Test Stand at Oak Ridge National Laboratory was constructed to test and condition powerful neutral beam sources for the Princeton Large Torus experiment at Princeton Plasma Physics Laboratory. The data acquisition system for the test stand monitors the beam characteristics and power output to determine if the beam is operating at its design specifications. The high speed of the computer system is utilized to provide near-real-time analysis of experimental data. The analysis of the data is presented as numerical tabulation and graphic display

  18. Powershift transmission for dump trucks; Neues Lastschaltgetriebe fuer Dump Trucks

    Energy Technology Data Exchange (ETDEWEB)

    Rebholz, Wolfgang; Geis, Joerg; Riedhammer, Michael [ZF Friedrichshafen AG, Friedrichshafen (Germany)

    2012-04-15

    Articulated dumpers (also called dump trucks) are used in many locations where large quantities of earth, spoil, gravel or other materials have to be moved on construction sites or in quarries. ZF has developed a new transmission with eight forward and four reverse gears up to production standard specifically for use in these vehicles. The integrated primary retarder is continuously controllable and provides maximum braking torque of up to 1800 Nm. (orig.)

  19. Collected abstracts on particle beam diagnostic systems

    International Nuclear Information System (INIS)

    Hickok, R.L.

    1979-01-01

    This report contains a compilation of abstracts on work related to particle beam diagnostics for high temperature plasmas. The abstracts were gathered in early 1978 and represent the status of the various programs as of that date. It is not suggested that this is a comprehensive list of all the work that is going on in the development of particle beam diagnostics, but it does provide a representative view of the work in this field. For example, no abstracts were received from the U.S.S.R. even though they have considerable activity in particle beam diagnostics

  20. Engineering aspects of particle beam fusion systems

    International Nuclear Information System (INIS)

    Cook, D.L.

    1982-01-01

    The Department of Energy is supporting research directed toward demonstration of DT fuel ignition in an Inertial Confinement Fusion (ICF) capsule. As part of the ICF effort, two major Particle Beam Fusion Accelerators (PBFA I and II) are being developed at Sandia National Laboratories with the objective of providing energetic light ion beams of sufficient power density for target implosion. Supporting light ion beam research is being performed at the Naval Research Laboratory and at Cornell University. If the answers to several key physics and engineering questions are favorable, pulsed power accelerators will be able to provide an efficient and inexpensive approach to high target gain and eventual power production applications

  1. The beam diagnosis system for ELSA. Das Strahldiagnosesystem fuer ELSA

    Energy Technology Data Exchange (ETDEWEB)

    Schillo, M.

    1991-10-01

    A beam diagnostic system, which is based on capacitive beam-position monitors combined with fast electronics, has been developed for the Bonn Electron Stretcher Accelerator ELSA. The position signal of each monitor is digitized at an adjustable sampling rate and the most recent 8192 position and intensity values are buffered. This allows a wide range of different beam diagnostic measurements. The main purpose is the closed-orbit correction, which can be carried out on various time scales. To optimize the duty factor of the extracted beam, the system can also be used as a fast relative intensity monitor resolving the intensity distribution of the bunches or of the injected beam. It is designed to support betatron tune and phase measurements with very high accuracy, offering the choice to select any of the beam position monitors. This enables the measuring of many optical parameters. Furthermore any pair of suitable monitors can be used for experimental particle tracking or phase space measurements. (orig.).

  2. Fast Dump of the ATLAS Toroids

    CERN Document Server

    Dudarev, A; Volpini, Giovanni; Dudarev, Alexey; Kate, Herman Ten

    2010-01-01

    The toroidal magnet system of the ATLAS Detector at CERN consists of a Barrel Toroid (BT) and two End Cap Toroids (ECT-A and ECT-C). Each toroid is built up from eight racetrack coils wound with an aluminum stabilized NbTi conductor and indirectly cooled by forced flow liquid helium. The three toroids operate in series at 20.5 kA with a total stored energy of 1.5 GJ. In order to verify the reliability and effectiveness of the quench protection system, series of fast dump tests have been performed first of the single toroids and finally of the entire toroidal magnet system. In this paper a model to simulate the fast dump of the ATLAS toroids in single mode operation and in full system configuration is presented. The model is validated through comparison with measured data extracted from the ramp-and-quench runs. The calculated energy dissipation in the various coils is in very good agreement (within 1-2\\%) with the enthalpy changes estimated from the temperature measurements of the different parts of the cold ...

  3. Operation of the NuMI Beam Monitoring System

    International Nuclear Information System (INIS)

    Zwaska, Robert M.; Indurthy, Dharma; Keisler, Ryan; Kopp, Sacha; Mendoza, Steven; Pavlovich, Zarko; Proga, Marek; Bishai, Mary; Diwan, Milind; Viren, Brett; Harris, Debbie; Marchionni, Alberto; Morfin, Jorge; McDonald, Jeffrey; Naples, Donna; Northacker, David; Erwin, Albert; Ping, Huican; Velissaris, Cristos

    2006-01-01

    The NuMI (Neutrinos at the Main Injector) facility produces an intense neutrino beam for experiments. The NuMI Beam Monitoring system consists of four arrays of ion chambers that measure the intensity and distribution of the remnant hadron and tertiary muon beams produced in association with the neutrinos. The ion chambers operate in an environment of high particle fluxes and high radiation

  4. Modematic: a fast laser beam analyzing system for high power CO2-laser beams

    Science.gov (United States)

    Olsen, Flemming O.; Ulrich, Dan

    2003-03-01

    The performance of an industrial laser is very much depending upon the characteristics of the laser beam. The ISO standards 11146 and 11154 describing test methods for laser beam parameters have been approved. To implement these methods in industry is difficult and especially for the infrared laser sources, such as the CO2-laser, the availabl analyzing systems are slow, difficult to apply and having limited reliability due to the nature of the detection methods. In an EUREKA-project the goal was defined to develop a laser beam analyzing system dedicated to high power CO2-lasers, which could fulfill the demands for an entire analyzing system, automating the time consuming pre-alignment and beam conditioning work required before a beam mode analyses, automating the analyzing sequences and data analysis required to determine the laser beam caustics and last but not least to deliver reliable close to real time data to the operator. The results of this project work will be described in this paper. The research project has led to the development of the Modematic laser beam analyzer, which is ready for the market.

  5. Conceptual design of dump resistor for superconducting CS of SST-1

    International Nuclear Information System (INIS)

    Roy, Swati; Pradhan, Subrata; Panchal, Arun

    2015-01-01

    During the upgradation of SST-1, the resistive central solenoid (CS) coil has been planned to be replaced with Nb 3 Sn based superconducting coil. The superconducting CS will store upto 3.5MJ of magnetic energy per operation cycle with operating current upto 14kA. In case of coil quench, the energy stored in the coils is to be extracted rapidly with a time constant of 1.5s. This will be achieved by inserting a 20m Ohm dump resistor in series with the superconducting CS which is normally shorted by circuit breakers. As a vital part of the superconducting CS quench protection system, a conceptual design of the 20m Ohm dump resistor has been proposed. In this paper, the required design aspects and a dimensional layout of the dump resistor for the new superconducting CS has been presented. Natural air circulation is proposed as cooling method for this dump resistor. The basic structure of the proposed dump resistor comprises of stainless steel grids connected in series in the shape of meander to minimize the stray inductance and increase the surface area for cooling. The entire dump resistor will be an array of such grids connected in series and parallel to meet electrical as well as thermal parameters. The maximum temperature of the proposed dump resistor is upto 350 °C during dump 3.5MJ energy. The proposed design permits indigenous fabrication of the dump resistor using commercially available welding techniques. (author)

  6. Spatial resolution test of a beam diagnostic system for DESIREE

    Science.gov (United States)

    Das, Susanta; Kallberg, A.

    2010-11-01

    A diagnostic system based on the observation of low energy ( ˜ 10 eV) secondary electrons (SE) produced by a beam, striking a metallic foil has been built to monitor and to cover the wide range of beam intensities and energies for Double ElectroStatic Ion Ring ExpEriment [1,2].The system consists of a Faraday cup to measure the beam current, a collimator with circular apertures of different diameters to measure the spatial resolution of the system, a beam profile monitoring system (BPMS), and a control unit. The BPMS, in turn, consists of an aluminim (Al) foil, a grid placed in front of the Al foil to accelerate the SE, position sensitive MCP, fluorescent screen, and a CCD camera to capture the images. The collimator contains a set of circular holes of different diameters and separations (d) between them. The collimator cuts out from the beam areas equal to the holes with separation d mm between the beams centers and creates well separated (distinguishable) narrow beams of approximately same intensity close to each other. A 10 keV proton beam was used. The spatial resolution of the system was tested for different Al plate and MCP voltages and resolution of better than 2 mm was achieved. Ref.: 1. K. Kruglov {et al}., NIM A 441 (2000) 595; 701 (2002) 193c, 2. MSL and Atomic Physics, Stockholm Univ.(www.msl.se, http://www.atom.physto.se/Cederquist/desiree/web/hc.html).

  7. Beam-induced pressure variations in a TFTR neutral-beam injector

    International Nuclear Information System (INIS)

    Willis, J.E.; Berkner, K.H.

    1981-10-01

    In neutral-beam injection systems either all or part of the gas flow into the neutralizer comes from the plasma source. When the beam is switched on, ions from the plasma source, which used to contribute to the gas flow, are converted to an energetic beam and are pumped away: hence reducing the gas input to the neutralizer. The large volume of the neutralizer and its high conductance damp out rapid changes; for example, when the gas to the source is first turned on, there is a 230 msec exponential rise time associated with pressure in the neutralizer. The neutralizer in turn acts as a source of gas to the first chamber and the first chamber to the second and so on. Beam dumps become additional sources of gas in the second chamber and target tank as gas molecules are collisionally desorbed from the surface of the dump. A simple analytical model (the equivalent of an electrical RC circuit) of the volumes and conductances of the system has been used to describe the pressure variations. The use of time dependent sources terms in the model gives an estimate of the desorption rate from the dumps and its time variation during a beam pulse

  8. MATLAB based beam orbit correction system of HLS storage ring

    International Nuclear Information System (INIS)

    Ding Shichuan; Liu Gongfa; Xuan Ke; Li Weimin; Wang Lin; Wang Jigang; Li Chuan; Bao Xun; Guo Weiqun

    2006-01-01

    The distortion of closed orbit usually causes much side effect which is harmful to synchrotron radiation source such as HLS, so it is necessary to correct the distortion of closed orbit. In this paper, the correction principle, development procedure and test of MATLAB based on beam orbit correction system of HLS storage ring are described. The correction system is consisted of the beam orbit measure system, corrector magnet system and the control system, and the beam orbit correction code based on MATLAB is working on the operation interface. The data of the beam orbit are analyzed and calculated firstly, and then the orbit is corrected by changing corrector strength via control system. The test shows that the distortion of closed orbit is from max 4.468 mm before correction to max 0.299 mm after correction as well as SDEV is from 2.986 mm to 0.087 mm. So the correction system reaches the design goal. (authors)

  9. Imagescope to photodiode beam-profile imaging system

    International Nuclear Information System (INIS)

    Chamberlin, D.D.; Hollabaugh, J.S.; Stump, C.J. Jr.

    1983-01-01

    Transverse beam-distribution measurements of high-current cw accelerators must be obtained from noninterceptive sensors. For the 100-mA H 2 or D beam of the Fusion Materials Irradiation Tst (FMIT) accelerator, these transverse properties may be obtained by detecting the visible radiation resulting from beam interactions with residual gas. A system of mirrors, intensified TV cameras, digitizers, and topographic reconstruction codes has been reported previously. This report describes a new technique for sensing and digitizing the light projected transversely from the beam of the FMIT accelerator at Los Alamos National Laboratory

  10. A beam energy measurement system at NIRS-930 cyclotron

    International Nuclear Information System (INIS)

    Hojo, S.; Honma, T.; Sakamoto, Y.; Miyahara, N.; Okada, T.; Komatsu, K.; Tsuji, N.; Yamada, S.

    2005-01-01

    A beam energy measurement system employing a set of capacitive probes has been developed at NIRS-930 cyclotron. Principle of the measurement is applying a modified-TOF method, so that the two proves are installed at one of the straight section in the beam transport line. Usually they are separated about 5.8 m, which is equivalent to the almost final path length of the beam extracted in the cyclotron. In the measurement, two beam signals are superimposed by adjusting a position of the downstream-probe along the beam direction with watching an oscilloscope screen roughly. In order to determine the beam energy accurately the signals are processed by MCA with suitable electric module. (author)

  11. Development of the TFTR neutral beam injection system

    International Nuclear Information System (INIS)

    Prichard, B.A. Jr.

    1978-01-01

    The TFTR Neutral Beam Lines are designed to inject 20 MW of 120 keV neutral deuterium atoms into the plasma. This is accomplished using 12 sources, 65 amperes each, mounted in 4 beam lines. The 120 kV sources are being developed by LBL and a prototype beam line which will be tested at Berkeley is being developed as a cooperative effort by LLL and LBL. The implementation of these beam lines has required the development of several associated pieces of hardware. The control and monitoring of the 12 sources will be done via the TFTR computer control system (CICADA) as will other parts of the machine, and software is being developed to condition and operate the sources automatically. The prototype beam line is scheduled to begin operation in the fall of 1978 and all four production beam lines on TFTR in 1982

  12. Accidental Beam Losses and Protection in the LHC

    International Nuclear Information System (INIS)

    Schmidt, R.; Wenninger, J.

    2005-01-01

    At top energy (proton momentum 7 TeV/c) with nominal beam parameters, each of the two LHC proton beams has a stored energy of 350 MJ threatening to damage accelerator equipment in case of accidental beam loss. It is essential that the beams are properly extracted onto the dump blocks in case of failure since these are the only elements that can withstand full beam impact. Although the energy stored in the beams at injection (450 GeV/c) is about 15 times smaller compared to top energy, the beams must still be properly extracted in case of large accidental beam losses. Failures must be detected at a sufficiently early stage and initiate a beam dump. Quenches and power converter failures will be detected by monitoring the correct functioning of the hardware systems. In addition, safe operation throughout the cycle requires the use of beam loss monitors, collimators and absorbers. Ideas of detection of fast beam current decay, monitoring of fast beam position changes and monitoring of fast magnet current changes are discussed, to provide the required redundancy for machine protection

  13. Accidental Beam Losses and Protection in the LHC

    Science.gov (United States)

    Schmidt, R.; Working Group On Machine Protection

    2005-06-01

    At top energy (proton momentum 7 TeV/c) with nominal beam parameters, each of the two LHC proton beams has a stored energy of 350 MJ threatening to damage accelerator equipment in case of accidental beam loss. It is essential that the beams are properly extracted onto the dump blocks in case of failure since these are the only elements that can withstand full beam impact. Although the energy stored in the beams at injection (450 GeV/c) is about 15 times smaller compared to top energy, the beams must still be properly extracted in case of large accidental beam losses. Failures must be detected at a sufficiently early stage and initiate a beam dump. Quenches and power converter failures will be detected by monitoring the correct functioning of the hardware systems. In addition, safe operation throughout the cycle requires the use of beam loss monitors, collimators and absorbers. Ideas of detection of fast beam current decay, monitoring of fast beam position changes and monitoring of fast magnet current changes are discussed, to provide the required redundancy for machine protection.

  14. Conventional external beam radiotherapy for central nervous system malignancies

    International Nuclear Information System (INIS)

    Halperin, E.C.; Burger, P.C.

    1985-01-01

    Fractionated external beam photon radiotherapy is an important component of the clinical management of malignant disease of the central nervous system. The practicing neurologist or neurosurgeon frequently relies on the consultative and treatment skills of a radiotherapist. This article provides a review for the nonradiotherapist of the place of conventional external beam radiotherapy in neuro-oncology. 23 references

  15. Wave Propagation in an Ion Beam-Plasma System

    DEFF Research Database (Denmark)

    Jensen, T. D.; Michelsen, Poul; Juul Rasmussen, Jens

    1979-01-01

    The spatial evolution of a velocity- or density-modulated ion beam is calculated for stable and unstable ion beam plasma systems, using the linearized Vlasov-Poisson equations. The propagation properties are found to be strongly dependent on the form of modulation. In the case of velocity...

  16. Observation of bifurcation phenomena in an electron beam plasma system

    International Nuclear Information System (INIS)

    Hayashi, N.; Tanaka, M.; Shinohara, S.; Kawai, Y.

    1995-01-01

    When an electron beam is injected into a plasma, unstable waves are excited spontaneously near the electron plasma frequency f pe by the electron beam plasma instability. The experiment on subharmonics in an electron beam plasma system was performed with a glow discharge tube. The bifurcation of unstable waves with the electron plasma frequency f pe and 1/2 f pe was observed using a double-plasma device. Furthermore, the period doubling route to chaos around the ion plasma frequency in an electron beam plasma system was reported. However, the physical mechanism of bifurcation phenomena in an electron beam plasma system has not been clarified so far. We have studied nonlinear behaviors of the electron beam plasma instability. It was found that there are some cases: the fundamental unstable waves and subharmonics of 2 period are excited by the electron beam plasma instability, the fundamental unstable waves and subharmonics of 3 period are excited. In this paper, we measured the energy distribution functions of electrons and the dispersion relation of test waves in order to examine the physical mechanism of bifurcation phenomena in an electron beam plasma system

  17. Mechanical engineering problems in the TFTR neutral beam system

    International Nuclear Information System (INIS)

    Cannon, D.D.; Bryant, E.H.; Johnson, R.L.; Kim, J.; Queen, C.C.; Schilling, G.

    1975-01-01

    A conceptual design of a prototype beam line for the TFTR Neutral Beam System has been developed. The basic components have been defined, cost estimates prepared, and the necessary development programs identified. Four major mechanical engineering problems, potential solutions and the required development programs are discussed

  18. Some aspects of the Unilac beam diagnostic system

    International Nuclear Information System (INIS)

    Glatz, J.; Klabunde, J.; Strehl, P.

    1976-01-01

    A survey of the Unilac beam diagnostic system is given with special reference to the operational experience collected during the running-in period. Devices for measurement and display of beam profiles, energy, rf phases and amplitudes and rf matching procedures between the different stages of the accelerator are described. Some aspects concerning future developments and improvements are discussed briefly. (author)

  19. 1 nA beam position monitoring system

    International Nuclear Information System (INIS)

    Ursic, R.; Flood, R.; Piller, C.

    1997-01-01

    A system has been developed at Jefferson Lab for measuring transverse position of very low current beams delivered to the Experimental Hall B of the Continuous Electron Beam Accelerator Facility (CEBAF). At the heart of the system is a position sensitive cavity operating at 1497 MHz. The cavity utilizes a unique design which achieves a high sensitivity to beam position at a relatively low cavity Q. The cavity output RF signal is processed using a down-converter and a commercial lock-in amplifier operating at 100 kHz. The system interfaces with a VME based EPICS control system using the IEEE, 488 bus. The main features of the system are simple and robust design, and wide dynamic range capable of handling beam currents from 1 nA to 1000 nA with an expected resolution better than 100 μm. This paper outlines the design of the system

  20. Beam Position and Phase Monitor - Wire Mapping System

    International Nuclear Information System (INIS)

    Watkins, Heath A.; Shurter, Robert B.; Gilpatrick, John D.; Kutac, Vincent G.; Martinez, Derwin

    2012-01-01

    The Los Alamos Neutron Science Center (LANSCE) deploys many cylindrical beam position and phase monitors (BPPM) throughout the linac to measure the beam central position, phase and bunched-beam current. Each monitor is calibrated and qualified prior to installation to insure it meets LANSCE requirements. The BPPM wire mapping system is used to map the BPPM electrode offset, sensitivity and higher order coefficients. This system uses a three-axis motion table to position the wire antenna structure within the cavity, simulating the beam excitation of a BPPM at a fundamental frequency of 201.25 MHz. RF signal strength is measured and recorded for the four electrodes as the antenna position is updated. An effort is underway to extend the systems service to the LANSCE facility by replacing obsolete electronic hardware and taking advantage of software enhancements. This paper describes the upgraded wire positioning system's new hardware and software capabilities including its revised antenna structure, motion control interface, RF measurement equipment and Labview software upgrades. The main purpose of the wire mapping system at LANSCE is to characterize the amplitude response versus beam central position of BPPMs before they are installed in the beam line. The wire mapping system is able to simulate a beam using a thin wire and measure the signal response as the wire position is varied within the BPPM aperture.

  1. Lithium beam diagnostic system on the COMPASS tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Anda, G.; Bencze, A. [Wigner – RCP, HAS, Budapest (Hungary); Berta, M., E-mail: bertam@sze.hu [Institute of Plasma Physics AS CR, Prague (Czech Republic); Széchenyi István University, Győr (Hungary); Dunai, D. [Wigner – RCP, HAS, Budapest (Hungary); Hacek, P. [Institute of Plasma Physics AS CR, Prague (Czech Republic); Faculty of Mathematics and Physics, Charles University in Prague, Prague (Czech Republic); Krbec, J. [Institute of Plasma Physics AS CR, Prague (Czech Republic); Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University in Prague, Prague (Czech Republic); Réfy, D.; Krizsanóczi, T.; Bató, S.; Ilkei, T.; Kiss, I.G.; Veres, G.; Zoletnik, S. [Wigner – RCP, HAS, Budapest (Hungary)

    2016-10-15

    Highlights: • Li-beam diagnostic system on the COMPASS tokamak is an improved and compact system to allow testing of Atomic Beam Probe. • The possibility to measure background corrected density profiles on the few microseconds time scale. • First Li-beam diagnostic system with recirculating neutralizer. • The system includes the redesigned ion source with longer lifetime. - Abstract: An improved lithium beam based beam emission spectroscopy system – installed on COMPASS tokamak – is described. The beam energy enhanced up to 120 keV for Atomic Beam Probe measurement. The size of the ion source is doubled, using a newly developed thermionic heater instead of the conventionally used heating (tungsten or molybdenum) filament. The neutralizer is also improved. It produces the same sodium vapor in a cell but minimize the loss condensing the vapor on a cold surface which is led back (in fluid state) into the sodium oven. This way we call it recirculating neutralizer. The observation system consists of a CCD camera and an avalanche photodiode array.

  2. The beam loss monitoring system for HLS storage ring

    CERN Document Server

    Li Yu Xiong; Li Wei; Li Jue Xin; Liu Zu Ping; Shao Bei Bei

    2001-01-01

    A beam loss monitoring system has been established at HLS. This paper gives its principle and scientific grounds. Study on the ring's TBA structure and utilization of Monte-Carlo calculation to the shower electrons is important in its design. The system composition and performance are also introduced. The detector BLMs, data acquisition devices and host PC are linked via CAN bus. This system is helpful to analyze beam loss distribution and regulate the machine operation parameters.

  3. Measurement system with high accuracy for laser beam quality.

    Science.gov (United States)

    Ke, Yi; Zeng, Ciling; Xie, Peiyuan; Jiang, Qingshan; Liang, Ke; Yang, Zhenyu; Zhao, Ming

    2015-05-20

    Presently, most of the laser beam quality measurement system collimates the optical path manually with low efficiency and low repeatability. To solve these problems, this paper proposed a new collimated method to improve the reliability and accuracy of the measurement results. The system accuracy controlled the position of the mirror to change laser beam propagation direction, which can realize the beam perpendicularly incident to the photosurface of camera. The experiment results show that the proposed system has good repeatability and the measuring deviation of M2 factor is less than 0.6%.

  4. Neutral beam systems for the magnetic fusion program

    International Nuclear Information System (INIS)

    Beal, J.W.; Staten, H.S.

    1977-01-01

    The attainment of economic, safe fusion power has been described as the most sophisticated scientific problem ever attacked by mankind. The presently established goal of the magnetic fusion program is to develop and demonstrate pure fusion central electric power stations for commercial applications. Neutral beam heating systems are a basic component of the tokamak and mirror experimental fusion plasma confinement devices. The requirements placed upon neutral beam heating systems are reviewed. The neutral beam systems in use or being developed are presented. Finally, the needs of the future are discussed

  5. Beam-based calibration system of BPM offset on BEPC

    International Nuclear Information System (INIS)

    Hu Chunliang

    2004-01-01

    The ever-increasing demand for better performance from circular accelerators requires improved methods to calibrate beam position monitors (BPM). A beam based calibration system has been established to locate the centers of the BPM with respect to the magnetic center of quadrupole magnets. Additional windings are applied to the quadrupole magnets to make the quadrupole magnetic strength individually adjustable and the number of the power supply of all 32 additional windings is only one. Software system has been finished to automatically measure the offsets of BPMs. The effect of the beam-based calibration system shows that the calibration of BPM has been more quickly and accurately

  6. LHC Report: Towards stable beams and collisions

    CERN Multimedia

    CERN Bulletin

    2011-01-01

    Over the past two weeks, the LHC re-commissioning with beam has continued at a brisk pace. The first collisions of 2011 were produced on 2 March, with stable beams and collisions for physics planned for the coming days. Low intensity beams with just a few bunches of particles were used to test the energy ramp to 3.5 TeV and the squeeze. The results were successful and, as a by-product, the first collisions of 2011 were recorded 2 March. One of the main activities carried out by the operation teams has been the careful set-up of the collimation system, and the injection and beam dump protection devices. The collimation system provides essential beam cleaning, preventing stray particles from impacting other elements of the machine, particularly the superconducting magnets. In addition to the collimation system, also the injection and beam dump protection devices perform a vital machine protection role, as they detect any beam that might be mis-directed during rare, but not totally unavoidable, hardware hiccups...

  7. Neutral beam injection system design for KSTAR tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Choi, B.H.; Lee, K.W.; Chung, K.S.; Oh, B.H.; Cho, Y.S.; Bae, Y.D.; Han, J.M. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1998-06-01

    The NBI system for KSTAR (Korean Superconducting Tokamak Advanced Research) has been designed based on conventional positive ion beam technology. One beam line consists of three ion sources, three neutralizers, one bending magnet, and one drift tube. This system will deliver 8 MW deuterium beam to KSTAR plasma in normal operation to support the advanced experiments on heating, current drive and profile control. The key technical issues in this design were high power ion source(120 kV, 65 A), long pulse operation (300 seconds; world record is 30 sec), and beam rotation from vertical to horizontal direction. The suggested important R and D points on ion source and beam line components are also included. (author). 7 refs., 27 figs., 1 tab.

  8. Dependence of electron beam instability growth rates on the beam-plasma system parameters

    International Nuclear Information System (INIS)

    Strangeway, R.J.

    1982-01-01

    Electron beam instabilites are studied by using a simple model for an electron beam streaming through a cold plasma, the beam being of finite width perpendicular to the ambient magnetic field. Through considerations of finite geometry and the coldness of the beam and background plasma, an instability similar to the two stream instability is assumed to be the means for wave growth in the system. Having found the maximum growth rate for one set of beam-plasma system parameters, this maximum growth rate is traced as these parameters are varied. The parameters that describe the system are the beam velocity (v/sub b/), electron gyrofrequency to ambient electron plasma frequency ratio (Ω/sub e//ω/sub p/e), the beam to background number density ratio (n/sub b//n/sub a/), and the beam width (a). When Ω/sub e//ω/sub p/e>1, a mode with Ω/sub e/<ω<ω/sub u/hr is found to be unstable, where Ω is the wave frequency and ω/sub u/hr is the upper hybrid resonance frequency. For low values of n/sub b//n/sub a/ and Ω/sub e/<ω/sub p/e, this mode is still present with ω/sub p/e<ω<ω/sub u/hr. If the beam density is large, n/sub b//n/sub a/approx. =1, the instability occures for frequencies just above the electron gyrofrequency. This mode may well be that observed in laboratory plasma before the system undergoes the beam-plasma discharge. There is another instability present, which occurs for ωapprox. =ω/sub p/e. The growth rates for this mode, which are generally larger than those found for the ωapprox. =ωuhr mode, are only weakly dependent on Ω/sub d//ω/sub p/e. That this mode is not always observed in the laboratory implies that some factors not considered in the present theory suppress this mode, specifically, finite beam length

  9. The ATLAS beam pick-up based timing system

    International Nuclear Information System (INIS)

    Ohm, C.; Pauly, T.

    2010-01-01

    The ATLAS BPTX stations are composed of electrostatic button pick-up detectors, located 175 m away along the beam pipe on both sides of ATLAS. The pick-ups are installed as a part of the LHC beam instrumentation and used by ATLAS for timing purposes. The usage of the BPTX signals in ATLAS is twofold: they are used both in the trigger system and for LHC beam monitoring. The BPTX signals are discriminated with a constant-fraction discriminator to provide a Level-1 trigger when a bunch passes through ATLAS. Furthermore, the BPTX detectors are used by a stand-alone monitoring system for the LHC bunches and timing signals. The BPTX monitoring system measures the phase between collisions and clock with a precision better than 100 ps in order to guarantee a stable phase relationship for optimal signal sampling in the sub-detector front-end electronics. In addition to monitoring this phase, the properties of the individual bunches are measured and the structure of the beams is determined. On September 10, 2008, the first LHC beams reached the ATLAS experiment. During this period with beam, the ATLAS BPTX system was used extensively to time in the read-out of the sub-detectors. In this paper, we present the performance of the BPTX system and its measurements of the first LHC beams.

  10. Thoughts of fast beam aborts for the international linear collider

    International Nuclear Information System (INIS)

    Mattison, T.

    2006-01-01

    The ILC beam is potentially very destructive, and a fast beam abort system is useful as part of the machine-protection strategy. Scaling laws for kicker pulse power and length optimization are presented. Kicker reference designs for the ILC with full linac aperture, and limited aperture, are presented. Power levels are of order 10 8 W for 100 nsec filling times, and length scales are of order 100 m. Design issues for beam transport to a dump are considered. Separation of the beams at the defining obstruction and energy bandwidth force either a long drift after the septum bend or long quads with large apertures for dispersion control. (author)

  11. LHC Beam Loss Monitoring System Verification Applications

    CERN Document Server

    Dehning, B; Zamantzas, C; Jackson, S

    2011-01-01

    The LHC Beam Loss Mon­i­tor­ing (BLM) sys­tem is one of the most com­plex in­stru­men­ta­tion sys­tems de­ployed in the LHC. In ad­di­tion to protecting the col­lid­er, the sys­tem also needs to pro­vide a means of di­ag­nos­ing ma­chine faults and de­liv­er a feed­back of loss­es to the control room as well as to sev­er­al sys­tems for their setup and analysis. It has to trans­mit and pro­cess sig­nals from al­most 4’000 mon­i­tors, and has near­ly 3 mil­lion con­fig­urable pa­ram­e­ters. The system was de­signed with re­li­a­bil­i­ty and avail­abil­i­ty in mind. The spec­i­fied op­er­a­tion and the fail-safe­ty stan­dards must be guar­an­teed for the sys­tem to per­form its func­tion in pre­vent­ing su­per­con­duc­tive mag­net de­struc­tion caused by par­ti­cle flux. Main­tain­ing the ex­pect­ed re­li­a­bil­i­ty re­quires ex­ten­sive test­ing and ver­i­fi­ca­tion. In this paper we re­port our most re­cent ad­di­t...

  12. Construction of the facility for the testing of the TFTR Neutral Beam Injector

    International Nuclear Information System (INIS)

    Haughian, J.; Lou, K.; Roth, D.

    1979-11-01

    The prototype for the TFTR Neutral Beam Injection System has been assembled at the Lawrence Berkeley Laboraory, and is presently under test. Some of the construction features of the shielding enclosure, the cryogenic supply system, control and computer area, and the auxiliary vacuum and utility supply system are described. In addition, the paper describes the target chamber, its beam dump and cryopanels, and the duct that connects the target chamber to the injector vessel

  13. A beam-synchronous gated peak-detector for the LHC beam observation system

    CERN Document Server

    Levens, T E; Wehrle, U

    2013-01-01

    Measurements of the bunch peak amplitude using the longitudinal wideband wall-current monitor are a vital tool used in the Large Hadron Collider (LHC) beam observation system. These peak-detected measurements can be used to diagnose bunch shape oscillations, for example coherent quadrupole oscillations, that occur at injection and during beam manipulations. Peak-detected Schottky diagnostics can also be used to obtain the synchrotron frequency distribution and other parameters from a bunched beam under stable conditions. For the LHC a beam-synchronous gated peak detector has been developed to allow individual bunches to be monitored without the influence of other bunches circulating in the machine. The requirement for the observation of both low intensity pilot bunches and high intensity bunches for physics requires a detector front-end with a high bandwidth and a large dynamic range while the usage for Schottky measurements requires low noise electronics. This paper will present the design of this detector s...

  14. Beam chopper development at LAMPF

    International Nuclear Information System (INIS)

    Hutson, R.L.; Cooke, D.W.; Heffner, R.H.; Schillaci, M.E.; Dodds, S.A.; Gist, G.A.

    1986-01-01

    In order to reduce pileup limitations on μSR data rates, a fast chopper for surface muon beams was built and tested at LAMPF. The system allowed one muon at a time to be stopped in a μSR sample in the following way: A surface beam from the LAMPF Stopped Muon Channel was focused through a crossed-field beam separator and onto a chopper slit. With the separator E and B fields adjusted properly, the beam could pass through the slit. The beam to the μSR sample was turned on or off (chopped) rapidly by switching the high voltage applied to the separator plates on or off within approximately 500 ns; with the E field off, the B field deflected the beam, dumping it near the slit. We demonstrated that, with improved electronics, we will be able to stop a single muon in a μSR sample as frequently as once every 20 μs and that data rates for the system can be a factor of five higher than is attainable with unchopped beams. The observed positron contamination of the beam was less than five percent, and the ratio of the muon rate with beam on to the rate with beam off was 1540

  15. Beam chopper development at LAMPF

    International Nuclear Information System (INIS)

    Hutson, R.L.; Cooke, D.W.; Heffner, R.H.; Schillaci, M.E.; Dodds, S.A.; Gist, G.A.

    1986-01-01

    In order to reduce pileup limitations on μSR data rates, a fast chopper for surface muon beams was built and tested at LAMPF. The system allowed one muon at a time to be stopped in a μSR sample in the following way: A surface beam from the LAMPF Stopped Muon Channel was focused through a crossed-field beam separator and onto a chopper slit. With the separator E and B fields adjusted properly, the beam could pass through the slit. The beam to the μSR sample was turned on or off (chopped) rapidly by switching the high voltage applied to the separator plates on or off within approximately 500 ns; with the E field off, the B field deflected the beam, dumping it near the slit. We demonstrated that, with improved electronics, we will be able to stop a single muon in a μSR sample as frequently as once every 20 μs and that data rates for the system can be a factor of five higher than is attainable with unchopped beams. The observed positron contamination of the beam was less than five percent, and the ratio of the muon rate with beam on to the rate with beam off was 1540. (orig.)

  16. Beam extraction control systems of the fast-cycling synchrotron

    International Nuclear Information System (INIS)

    Toumanian, A.; Zapolski, N.; Nickogosian, V.; Ananian, A.; Kazarian, A.; Khoetsian, M.; Agababian, A.; Matevosian, A.

    1992-01-01

    A compact system controlling the extraction of different beams (gamma, electron, synchrotron radiation) in single and simultaneous operation modes at high electromagnetic disturbances level based on using one computer of IBM PC/AT type is described. (author)

  17. The beam handling system of the Oslo Cyclotron

    International Nuclear Information System (INIS)

    Messelt, S.

    1985-11-01

    The beam optic system of the Oslo Cyclotron is described. A computer program for the calculation of optimal settings of quadropoles is presented. The reliability of the computer program is confirmed by experimental data

  18. Demonstration of direct energy recovery of full-energy ions at 40 keV on a PLT/ISX beam system

    International Nuclear Information System (INIS)

    Stirling, W.L.; Barber, G.C.; Dagenhart, W.K.

    1981-01-01

    Neutral beam injection systems that employ positive ion sources presently operate at energies of about 40 to 50 keV/nucleon at 60 A [Princeton Large Torus (PLT)] or 100 A [Princeton Divertor Experiment (PDX) or the Oak Ridge National Laboratory (ORNL) Impurities Study Experiment (ISX)] with about 60% conversion efficiency. However, the desire for multisecond beams in the 80-keV/nucleon energy range at approx. 10 MW/module has emphasized the need for technological advances in several areas. At such beam energies, as much as 75% of the initial beam energy is retained in the unneutralized ion components. As a result, two questions immediately come to mind: (1) how can one dispose of this energy; or better still, (2) how can one efficiently recover this energy. We have proposed and demonstrated a unique solution to this problem that not only removes the need for beam dumps but also returns from 50 to 80% of the energy contained in the full energy ion component directly and dynamically to the high voltage supply. In fact, the energy in the residual ion component is not expended. The tests were made on a PLT/ISX-type beam line at 40 keV/nucleon with about 800 kW and 0.1 s

  19. Beam-plasma interaction in case of injection of the electron beam to the symmetrically open plasma system

    International Nuclear Information System (INIS)

    Opanasenko, A.V.; Romanyuk, L.I.

    1992-01-01

    A beam-plasma interaction at the entrance of the symmetrically open plasma system with an electron beam injected through it is investigated. An ignition of the plasma-beam discharge on waves of upper hybrid dispersion branch of a magnetoactive plasma is found in the plasma penetrating into the vacuum contrary to the beam. It is shown that the beam-plasma discharge is localized in the inhomogeneous penetrating plasma in the zone where only these waves exist. Regularities of the beam-plasma discharge ignition and manifestation are described. It is determined that the electron beam crossing the discharge zone leads to the strong energy relaxation of the beam. It is shown possible to control the beam-plasma discharge ignition by changing the potential of the electron beam collector. (author)

  20. Geometrical E-beam proximity correction for raster scan systems

    Science.gov (United States)

    Belic, Nikola; Eisenmann, Hans; Hartmann, Hans; Waas, Thomas

    1999-04-01

    High pattern fidelity is a basic requirement for the generation of masks containing sub micro structures and for direct writing. Increasing needs mainly emerging from OPC at mask level and x-ray lithography require a correction of the e-beam proximity effect. The most part of e-beam writers are raster scan system. This paper describes a new method for geometrical pattern correction in order to provide a correction solution for e-beam system that are not able to apply variable doses.

  1. A Dynamic Alignment System for the Final Focus Test Beam

    International Nuclear Information System (INIS)

    Ruland, R.E.; Bressler, V.E.; Fischer, G.; Plouffe, D.; SLAC

    2005-01-01

    The Final Focus Test Beam (FFTB) was conceived as a technological stepping stone on the way to the next linear collider. Nowhere is this more evident than with the alignment subsystems. Alignment tolerances for components prior to beam turn are almost an order of magnitude smaller than for previous projects at SLAC. Position monitoring systems which operate independent of the beam are employed to monitor motions of the components locally and globally with unprecedented precision. An overview of the FFTB alignment system is presented herein

  2. CAVITY BEAM POSITION MONITOR SYSTEM FOR ATF2

    CERN Document Server

    Boogert, S T; Cullinan, F; Joshi, N; Lyapin, A; Aryshev, A; Honda, Y; Naito, T; Terunuma, N; Urakara, J; Heo, A; Kim, E-S; Kim, Y I; McCormick, D; Frisch, J; Nelson, J; Smith, T; White, G R

    2011-01-01

    The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 41 high resolution C and S band resonant cavity beam position monitors (BPM) with associated mixer electronics and digitisers. In addition 4 high resolution BPMs have been recently installed at the interaction point, we briefly describe the first operational experience of these cavities in the ATF2 beam-line. The current status of the overall BPM system is also described, with a focus on operational techniques and performance.

  3. Thermomechanical assessment of the effects of a jaw-beam angle during beam impact on Large Hadron Collider collimators

    Science.gov (United States)

    Cauchi, Marija; Assmann, R. W.; Bertarelli, A.; Carra, F.; Lari, L.; Rossi, A.; Mollicone, P.; Sammut, N.

    2015-02-01

    The correct functioning of a collimation system is crucial to safely and successfully operate high-energy particle accelerators, such as the Large Hadron Collider (LHC). However, the requirements to handle high-intensity beams can be demanding, and accident scenarios must be well studied in order to assess if the collimator design is robust against possible error scenarios. One of the catastrophic, though not very probable, accident scenarios identified within the LHC is an asynchronous beam dump. In this case, one (or more) of the 15 precharged kicker circuits fires out of time with the abort gap, spraying beam pulses onto LHC machine elements before the machine protection system can fire the remaining kicker circuits and bring the beam to the dump. If a proton bunch directly hits a collimator during such an event, severe beam-induced damage such as magnet quenches and other equipment damage might result, with consequent downtime for the machine. This study investigates a number of newly defined jaw error cases, which include angular misalignment errors of the collimator jaw. A numerical finite element method approach is presented in order to precisely evaluate the thermomechanical response of tertiary collimators to beam impact. We identify the most critical and interesting cases, and show that a tilt of the jaw can actually mitigate the effect of an asynchronous dump on the collimators. Relevant collimator damage limits are taken into account, with the aim to identify optimal operational conditions for the LHC.

  4. Thermomechanical assessment of the effects of a jaw-beam angle during beam impact on Large Hadron Collider collimators

    Directory of Open Access Journals (Sweden)

    Marija Cauchi

    2015-02-01

    Full Text Available The correct functioning of a collimation system is crucial to safely and successfully operate high-energy particle accelerators, such as the Large Hadron Collider (LHC. However, the requirements to handle high-intensity beams can be demanding, and accident scenarios must be well studied in order to assess if the collimator design is robust against possible error scenarios. One of the catastrophic, though not very probable, accident scenarios identified within the LHC is an asynchronous beam dump. In this case, one (or more of the 15 precharged kicker circuits fires out of time with the abort gap, spraying beam pulses onto LHC machine elements before the machine protection system can fire the remaining kicker circuits and bring the beam to the dump. If a proton bunch directly hits a collimator during such an event, severe beam-induced damage such as magnet quenches and other equipment damage might result, with consequent downtime for the machine. This study investigates a number of newly defined jaw error cases, which include angular misalignment errors of the collimator jaw. A numerical finite element method approach is presented in order to precisely evaluate the thermomechanical response of tertiary collimators to beam impact. We identify the most critical and interesting cases, and show that a tilt of the jaw can actually mitigate the effect of an asynchronous dump on the collimators. Relevant collimator damage limits are taken into account, with the aim to identify optimal operational conditions for the LHC.

  5. LHC Report: The beam is back at the LHC

    CERN Multimedia

    Reyes Alemany

    2015-01-01

    A series of sector beam tests paved the way for the start-up of the LHC in 2008 and 2009. These tests and the follow-up of the issues that arose were part of the process that led to a smooth start-up with beam.   Given this experience, sector tests were scheduled to take place several weeks before the 2015 start-up. On the weekend of 6-9 March, beam from the SPS was injected into both LHC injection regions, followed by a first pass through the downstream LHC sectors. For the clockwise LHC beam (called “beam 1”) this meant passing through ALICE and into Sector 2-3, while the anticlockwise beam (called “beam 2”) was threaded through LHCb and all the way from Point 8 to Point 6, where it was extracted by the beam dump kickers onto the beam dump block. The dry runs in the previous weeks were mainly targeted at preparation for the sector tests. The systems tested included: injection, timing, synchronisation and beam instrumentation. The beam interlock ...

  6. Fluka and thermo-mechanical studies for the CLIC main dump

    CERN Document Server

    Mereghetti, Alessio; Vlachoudis, Vasilis

    2011-01-01

    In order to best cope with the challenge of absorbing the multi-MW beam, a water beam dump at the end of the CLIC post-collision line has been proposed. The design of the dump for the Conceptual Design Report (CDR) was checked against with a set of FLUKA Monte Carlo simulations, for the estimation of the peak and total power absorbed by the water and the vessel. Fluence spectra of escaping particles and activation rates of radio-nuclides were computed as well. Finally, the thermal transient behavior of the water bath and a thermo-mechanical analysis of the preliminary design of the window were done.

  7. The Automation Control System Design of Walking Beam Heating Furnace

    OpenAIRE

    Hong-Yu LIU; Jun-Qing LIU; Jun-Jie XI

    2014-01-01

    Combining the transformation project of certain strip steel rolling production line, the techniques process of walking beam heating furnace was elaborated in this paper. The practical application of LOS-T18-2ZC1 laser detector was elaborated. The network communication model of walking beam heating furnace control system was designed. The realization method of production process automation control was elaborated. The entire automation control system allocation picture and PLC power distributio...

  8. CAVITY BEAM POSITION MONITOR SYSTEM FOR ATF2

    CERN Document Server

    Boogert, S T; Boorman, G; Molloy, S; Ross, M; Aryshev, A; Honda, Y; Terunuma, N; Urakawa, J; Kim, E S; Kim, Y I; Heo, A E; Lyapin, A; Swinson, C J; Frisch, J; McCormick, D M; Nelson, J; Smith, T; White, G R

    2010-01-01

    The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 38 C and S band resonant cavity beam position monitors (CBPM) with associated mixer electronics and digitizers. The current status of the BPM system is described, with a focus on operational techniques and performance.

  9. Performance of the DIII-D neutral beam injection system

    International Nuclear Information System (INIS)

    Kim, J.; Callis, R.W.; Colleraine, A.P.; Cummings, J.; Glad, A.S.; Gootgeld, A.M.; Haskovec, J.S.; Hong, R.; Kellman, D.H.; Langhorn, A.R.

    1987-01-01

    During the upgrade of the Doublet III tokamak, the neutral beam injection system as also modified to accommodate long pulse sources and to utilize the larger entrance apertures to the torus vessel. All four beamlines on DIII-D are now in operation with a total of eight common long pulse sources. These have exhibited easier conditioning and good reproducibility. Performance results of the beamlines and supporting systems are presented, and the observed beam properties are discussed

  10. Calculation of the beam injector steering system using Helmholtz coils

    International Nuclear Information System (INIS)

    Passaro, A.; Sircilli Neto, F.; Migliano, A.C.C.

    1991-03-01

    In this work, a preliminary evaluation of the beam injector steering system of the IEAv electron linac is presented. From the existing injector configuration and with the assumptions of monoenergetic beam (100 keV) and uniform magnetic field, two pairs of Helmholtz coils were calculated for the steering system. Excitations of 105 A.turn and 37 A.turn were determined for the first and second coils, respectively. (author)

  11. Transient beam loading in the ALS harmonic RF system

    International Nuclear Information System (INIS)

    Byrd, J.; De Santis, S.; Georgsson, M.; Stover, G.; Fox, J.; Prabhakar, S.; Teytelman, D.

    2000-01-01

    We report on the commissioning of a higher harmonic radiofrequency system at the Advanced Light Source, designed to improve the beam lifetime. We have achieved an increase above a factor of two in our best results up to now. Transient beam loading of the harmonic cavities, due to the unequal fill patterns, creates the greatest limitation on lifetime improvement. We also describe several interesting effects on the operation of the longitudinal and transverse multibunch feedback system

  12. Optical manipulation with two beam traps in microfluidic polymer systems

    DEFF Research Database (Denmark)

    Khoury Arvelo, Maria; Matteucci, Marco; Sørensen, Kristian Tølbøl

    2015-01-01

    An optical trapping system with two opposing laser beams, also known as the optical stretcher, are naturally constructed inside a microfluidic lab-on-chip system. We present and compare two approaches to combine a simple microfluidic system with either waveguides directly written in the microflui......An optical trapping system with two opposing laser beams, also known as the optical stretcher, are naturally constructed inside a microfluidic lab-on-chip system. We present and compare two approaches to combine a simple microfluidic system with either waveguides directly written...

  13. Old dumps of uranium mining

    International Nuclear Information System (INIS)

    Gatzweiler, R.; Mager, D.

    1993-01-01

    The production of natural uranium through mining and milling results in large volumes of low-level radioactive waste, mainly in mine dumps and mill tailings. Hazards which relate to abandoned uranium production sites and environmental remediation approaches are described in reference to the Wismut case. During the period 1947 to 1990 the former Soviet-German Wismut Corporation produced about 200 000 t of uranium from several deposits in Thuringia and Saxonia within a relatively small and densely populated area. These activities resulted in major land disturbance and other environmental damage. Restoration problems are highlighted. (orig.)

  14. International Surveillance Mechanism for Sea Dumping of Radioactive Waste

    Science.gov (United States)

    OECD Observer, 1977

    1977-01-01

    The OECD consultation and surveillance mechanism is discussed in detail in this article. Four phases are identified and examined: (1) Notification, (2) Consultation, (3) Supervision, (4) Post-operation. This system is designed to provide the safest possible conditions for sea dumping of radioactive wastes. (MA)

  15. Solid waste dumping site suitability analysis using geographic ...

    African Journals Online (AJOL)

    Solid waste dumping site suitability analysis using geographic information system (GIS) and remote sensing for Bahir Dar Town, North Western Ethiopia. ... The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

  16. Direct-heating solar-collector dump valve

    Science.gov (United States)

    Howikman, T. C.

    1977-01-01

    Five-port ganged valve isolates collector from primary load system pressure and drains collectors, allowing use of direct heating with all its advantages. Valve is opened and closed by same switch that controls pump or by temperature sensor set at O C, while providing direct dump option.

  17. Beam Tracking in Switched-Beam Antenna System for V2V Communication

    Directory of Open Access Journals (Sweden)

    Settawit Poochaya

    2016-01-01

    Full Text Available This paper presents the proposed switched beam antenna system for V2V communication including optimum antenna half power beamwidth determination in urban road environments. SQP optimization method is selected for the computation of optimum antenna half power beamwidth. In addition, beam tracking algorithm is applied to guarantee the best beam selection with maximum RSSI. The results present the success of the proposed system with the increasing of V2V performance metrics. Also, V2V data dissemination via the proposed system introduces the enhancement of V2V link in terms of RSSI, PER, BER, Tsafe, and Rsafe. The results indicate the improvement of V2V link reliability. Consequently, the road safety is improved.

  18. Beam forming system modernization at the MMF linac proton injector

    CERN Document Server

    Derbilov, V I; Nikulin, E S; Frolov, O T

    2001-01-01

    The isolation improvements of the beam forming system (BFS) of the MMF linac proton injector ion source are reported. The mean beam current and,accordingly, BFS electrode heating were increased when the MMF linac has began to operate regularly in long beam sessions with 50 Hz pulse repetition rate. That is why the BFS electrode high-voltage isolation that was made previously as two consequently and rigidly glued solid cylinder insulators has lost mechanical and electric durability. The substitution of large (160 mm) diameter cylinder insulator for four small diameter (20 mm) tubular rods has improved vacuum conditions in the space of beam forming and has allowed to operate without failures when beam currents being up to 250 mA and extraction and focusing voltage being up to 25 and 40 kV respectively. Moreover,the construction provides the opportunity of electrode axial move. The insulators are free from electrode thermal expansion mechanical efforts in a transverse direction.

  19. Beam propagation considerations in the Aurora laser system

    International Nuclear Information System (INIS)

    Rosoche, L.A.; Mc Leod, J.; Hanlon, J.A.

    1987-01-01

    Aurora is a high-power KrF laser system now being constructed for inertial confinement fusion (ICF) studies. It will use optical angular multiplexing and serial amplification by electron-beam-driven KrF amplifiers to deliver a stacked, multikilojoule 5-ns-duration laser pulse to ICF targets. The requirements of angular multiplexing KrF lasers at the multikilojoule level dictate path lengths on the order of 1 km. The inherent complicated path crossings produced by angular multiplexing and pulse stacking do not allow isolation of individual beam lines, so the optical quality of the long beam paths must be controlled. Propagation of the 248-nm light beams over long paths in air is affected by scattering, absorption thermal gradients and turbulence, beam alignment, and control and optical component figure errors

  20. Design of fast kickers for the ISABELLE beam abort system

    International Nuclear Information System (INIS)

    Nawrocky, R.J.; Montemurro, P.A.; Baron, J.

    1981-01-01

    The ISA beam abort (extraction) system must be highly efficient, in the sense of producing minimum beam loss, and reliable to prevent serious damage to accelerator components by the circulating high-energy beams. Since the stored beams will be debunched, the low-loss requirement can be met only with ultra-thin extraction septa and/or fast-acting kickers. This paper examines the design of the ISA extraction kickers subject to a set of extraction channel constraints and a given maximum working voltage. Expressions are derived for determining system parameters for both a lumped parameter magnet and a delay-line magnet. Using these relationships, design parameters are worked out for several possible system configurations. The paper also describes the construction of a full-scale prototype module of the kicker and summarizes the preliminary test results obtained with the module

  1. Efficiency of Low-Profile External Dumping at Open Pit Coal Mining in Kemerovo Region

    Science.gov (United States)

    Selyukov, Alexey; Ermolaev, Vyacheslav; Kostinez, Irina

    2017-11-01

    Kemerovo region is one of the largest industrial regions of Russia, with a raw material specialization. The rapid growth of the coal industry in recent years has been greatly facilitated by the expansion and development of open pit mining for coal seams extraction, accompanied by an increase in the volumes of overburden and the height of the dumps. There are about 400 objects in the Russian Federation Government Register of Waste Disposal Facilities 80% of which are dumps. Approaches both to external dumping and to the technical stage of reclamation currently contribute to the growth of geomorphic system's instability. Thus, it is proposed to slightly change the approaches to external dumping: the essence consists in the formation of an external dump of overburden, which in future would represent a favorable landscape unit of a flat surface relief used for subsequent differently directed purposes.

  2. Efficiency of Low-Profile External Dumping at Open Pit Coal Mining in Kemerovo Region

    Directory of Open Access Journals (Sweden)

    Selyukov Alexey

    2017-01-01

    Full Text Available Kemerovo region is one of the largest industrial regions of Russia, with a raw material specialization. The rapid growth of the coal industry in recent years has been greatly facilitated by the expansion and development of open pit mining for coal seams extraction, accompanied by an increase in the volumes of overburden and the height of the dumps. There are about 400 objects in the Russian Federation Government Register of Waste Disposal Facilities 80% of which are dumps. Approaches both to external dumping and to the technical stage of reclamation currently contribute to the growth of geomorphic system's instability. Thus, it is proposed to slightly change the approaches to external dumping: the essence consists in the formation of an external dump of overburden, which in future would represent a favorable landscape unit of a flat surface relief used for subsequent differently directed purposes.

  3. Fast Beam Current Change Monitor for the LHC

    CERN Document Server

    Kral, Jan

    Stringent demands on the LHC safety and protection systems require improved methods of detecting fast beam losses. The Fast Beam Current Transformer (FBCT) is a measurement instrument, providing information about bunch-to-bunch intensity of the accelerated beam. This thesis describes the development of a new protection system based on the FBCT signal measurements. This system, the Fast Beam Current Change Monitor (FBCCM), measures the FBCT signal in a narrow frequency band and computes time derivation of the beam signal magnitude. This derivation is proportional to the beam losses. When the losses exceed a certain level, the FBCCM requests a beam dump in order to protect the LHC. The LHC protection will be ensured by four FBCCMs which will be installed into the LHC in July 2014. Six FBCCMs have been already constructed and their characteristics were measured with satisfactory results. The FBCCMs were tested by a laboratory simulation of the real LHC environment.

  4. Electron beam diagnostic system using computed tomography and an annular sensor

    Science.gov (United States)

    Elmer, John W.; Teruya, Alan T.

    2014-07-29

    A system for analyzing an electron beam including a circular electron beam diagnostic sensor adapted to receive the electron beam, the circular electron beam diagnostic sensor having a central axis; an annular sensor structure operatively connected to the circular electron beam diagnostic sensor, wherein the sensor structure receives the electron beam; a system for sweeping the electron beam radially outward from the central axis of the circular electron beam diagnostic sensor to the annular sensor structure wherein the electron beam is intercepted by the annular sensor structure; and a device for measuring the electron beam that is intercepted by the annular sensor structure.

  5. Dose error analysis for a scanned proton beam delivery system

    International Nuclear Information System (INIS)

    Coutrakon, G; Wang, N; Miller, D W; Yang, Y

    2010-01-01

    All particle beam scanning systems are subject to dose delivery errors due to errors in position, energy and intensity of the delivered beam. In addition, finite scan speeds, beam spill non-uniformities, and delays in detector, detector electronics and magnet responses will all contribute errors in delivery. In this paper, we present dose errors for an 8 x 10 x 8 cm 3 target of uniform water equivalent density with 8 cm spread out Bragg peak and a prescribed dose of 2 Gy. Lower doses are also analyzed and presented later in the paper. Beam energy errors and errors due to limitations of scanning system hardware have been included in the analysis. By using Gaussian shaped pencil beams derived from measurements in the research room of the James M Slater Proton Treatment and Research Center at Loma Linda, CA and executing treatment simulations multiple times, statistical dose errors have been calculated in each 2.5 mm cubic voxel in the target. These errors were calculated by delivering multiple treatments to the same volume and calculating the rms variation in delivered dose at each voxel in the target. The variations in dose were the result of random beam delivery errors such as proton energy, spot position and intensity fluctuations. The results show that with reasonable assumptions of random beam delivery errors, the spot scanning technique yielded an rms dose error in each voxel less than 2% or 3% of the 2 Gy prescribed dose. These calculated errors are within acceptable clinical limits for radiation therapy.

  6. Excimer laser beam delivery systems for medical applications

    Science.gov (United States)

    Kubo, Uichi; Hashishin, Yuichi; Okada, Kazuyuki; Tanaka, Hiroyuki

    1993-05-01

    We have been doing the basic experiments of UV laser beams and biotissue interaction with both KrF and XeCl lasers. However, the conventional optical fiber can not be available for power UV beams. So we have been investigating about UV power beam delivery systems. These experiments carry on with the same elements doped quartz fibers and the hollow tube. The doped elements are OH ion, chlorine and fluorine. In our latest work, we have tried ArF excimer laser and biotissue interactions, and the beam delivery experiments. From our experimental results, we found that the ArF laser beam has high incision ability for hard biotissue. For example, in the case of the cow's bone incision, the incision depth by ArF laser was ca.15 times of KrF laser. Therefore, ArF laser would be expected to harden biotissue therapy as non-thermal method. However, its beam delivery is difficult to work in this time. We will develop ArF laser beam delivery systems.

  7. ADVANCEMENT OF THE RHIC BEAM ABORT KICKER SYSTEM

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.; MI, J.; OERTER, B.; SANDBERG, J.; WARBURTON, D.

    2003-01-01

    As one of the most critical system for RHIC operation, the beam abort kicker system has to be highly available, reliable, and stable for the entire operating range. Along with the RHIC commission and operation, consistent efforts have been spend to cope with immediate issues as well as inherited design issues. Major design changes have been implemented to achieve the higher operating voltage, longer high voltage hold-off time, fast retriggering and redundant triggering, and improved system protection, etc. Recent system test has demonstrated for the first time that both blue ring and yellow ring beam abort systems have achieved more than 24 hours hold off time at desired operating voltage. In this paper, we report break down, thyratron reverse arcing, and to build a fast re-trigger system to reduce beam spreading in event of premature discharge

  8. The Booster to AGS beam transfer fast kicker systems

    International Nuclear Information System (INIS)

    Zhang, W.; Bunicci, J.; Soukas, A.V.; Zhang, S.Y.

    1992-01-01

    The Brookhaven AGS Booster has a very successful commissioning period in June 1991. The third phase of that commissioning was a beam extraction test. The Booster extraction fast kicker (F3) deflected a 1.2 GeV proton beam from the Booster circulating orbit into the extraction septum aperture, partially down the extraction line to a temporary beam stop. Now, the Booster is committed to the AGS operations program for both heavy ion and proton beams. Thus, the Booster extraction and the corresponding AGS injection systems must operate routinely up to a pulse repetition frequency of 7.5 Hertz, and up to a beam energy of 1.5 Gev. The injection fast kicker is located in the A5 section of the AGS ring and is used to deflect the proton or heavy ion beam into its final AGS closed orbit. A distinctive feature of the AGS injection fast kicker modulators is the tail-bitting function required for proton beam injection. This enables the system to produce a fast current fall time to go along with the high current pulse amplitude with a fast rise time. The AGS injection fast kicker system has three pulse modulators, and each modulator consists of two thyratrons. The main PFN thyratrons switch on the current, and the tail bitting thyratrons are used to force the magnet current to decrease rapidly. Two digital pulse delay generators are used to align the main thyratrons and the tail bitting thyratrons respectively. The system has been tested and installed. The final commissioning of the Booster to AGS beam transfer line and injection is currently being undertaken. In this article, the system design, realization techniques and performance data will be presented

  9. Very-high-level neutral-beam control system

    International Nuclear Information System (INIS)

    Elischer, V.; Jacobson, V.; Theil, E.

    1981-10-01

    As increasing numbers of neutral beams are added to fusion machines, their operation can consume a significant fraction of a facility's total resources. LBL has developed a very high level control system that allows a neutral beam injector to be treated as a black box with just 2 controls: one to set the beam power and one to set the pulse duration. This 2 knob view allows simple operation and provides a natural base for implementing even higher level controls such as automatic source conditioning

  10. Direct Measurement of Neutral/Ion Beam Power using Thermocouple Analysis

    International Nuclear Information System (INIS)

    Day, I.; Gee, S.

    2006-01-01

    Modern Neutral Beam Injection systems such as those used on JET and MAST routinely use thermocouples embedded close to the surface of beam stopping elements, such as calorimeters and ion dumps, coupled to high speed data acquisition systems to determine beam profile and position from temperature rise data. With the availability of low cost data acquisition and storage systems it is now possible to record data from all thermocouples in a fully instrumented calorimeter or ion dump on 20 ms timescales or better. This sample rate is sufficiently fast to enable the thermocouple data to be used to calculate the incident power density from 1d heat transfer theory. This power density data coupled with appropriate Gaussian fits enables the determination of the 2d beam profile and thus allows an instantaneous and direct measurement of beam power. The theory and methodology required to analyse the fast thermocouple data from the MAST calorimeter and residual ion dump thermocouples is presented and direct measurements of beam power density are demonstrated. The power of desktop computers allows such analysis to be carried out virtually instantaneously. The methods used to automate this analysis are discussed in detail. A code, utilising the theory and methodology, has been developed to allow immediate measurements of beam power on a pulse by pulse basis. The uncertainty in determining the beam power density is shown to be less than 10 %. This power density data is then fitted to a 2d Gaussian beam profile and integrated to establish the total beam power. Results of this automated analysis for the neutral beam and residual ion power of the MAST duopigatron and PINI NBI systems are presented. This technology could be applied to a beam power safety interlock system. The application to a beam shine through protection system for the inner wall of the JET Tokamak is discussed as an example. (author)

  11. ICFA Beam Dynamics Newsletter

    Energy Technology Data Exchange (ETDEWEB)

    Ben-Zvi I.; Kuczewski A.; Altinbas, Z.; Beavis, D.; Belomestnykh,; Dai, J. et al

    2012-07-01

    The Collider-Accelerator Department at Brookhaven National Laboratory is building a high-brightness 500 mA capable Energy Recovery Linac (ERL) as one of its main R&D thrusts towards eRHIC, the polarized electron - hadron collider as an upgrade of the operating RHIC facility. The ERL is in final assembly stages, with injection commisioning starting in October 2012. The objective of this ERL is to serve as a platform for R&D into high current ERL, in particular issues of halo generation and control, Higher-Order Mode (HOM) issues, coherent emissions for the beam and high-brightness, high-power beam generation and preservation. The R&D ERL features a superconducting laser-photocathode RF gun with a high quantum efficiency photoccathode served with a load-lock cathode delivery system, a highly damped 5-cell accelerating cavity, a highly flexible single-pass loop and a comprehensive system of beam instrumentation. In this ICFA Beam Dynamics Newsletter article we will describe the ERL in a degree of detail that is not usually found in regular publications. We will discuss the various systems of the ERL, following the electrons from the photocathode to the beam dump, cover the control system, machine protection etc and summarize with the status of the ERL systems.

  12. Beam test with the HIMAC RF control system

    International Nuclear Information System (INIS)

    Kanazawa, M.; Sato, K.; Itano, A.

    1992-01-01

    RF system of the HIMAC synchrotron has been developed and tested in the factory. With the high power system, we could sweep the acceleration frequency from 1MHz to 8MHz with the acceleration voltage of 6KV. The performance of the RF control system has been confirmed with a developed simulator of the synchrotron oscillation. Following these two tests in the factory, we had a beam test of the RF control system at TARN-II in INS (Institute for Nuclear Study, University of Tokyo). This paper describes the beam test and its results. (author)

  13. The battle of the dumps continues

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    Although East Rand Gold and Uranium Company is about to start exploitation of the old slimes dams to produce gold, uranium and sulphuric acid, the battle to suppress dust and establish vegetation on the old dumps continues. The physical problems, planning, co-ordination and legal aspects of mine dump reclamation are outlined

  14. LCT protective dump-switch tests

    International Nuclear Information System (INIS)

    Parsons, W.M.

    1981-01-01

    Each of the six coils in the Large Coil Task (LCT) has a separate power supply, dump resistor, and switching circuit. Each switching circuit contains five switches, two of which are redundant. The three remaining switches perform separate duties in an emergency dump situation. These three switches were tested to determine their ability to meet the LCT conditions

  15. Design of the AGS Booster beam position monitor system

    International Nuclear Information System (INIS)

    Beadle, E.; Brennan, J.M.; Ciardullo, D.J.; Savino, J.; Stanziani, V.; Thomas, R.; Van Zwienen, W.; Witkover, R.L.; Schulte, E.

    1989-01-01

    The AGS Booster beam position monitor system must cover a wide range of beam intensity and bunch length for proton and heavy ion acceleration. The detector is designed to maintain 0.1 mm local tolerance following 300 degree C bakeout. The electronics will be located in the tunnel, communicating via fiber optic links to avoid ground loops. The design will be described and test results for prototype units presented. 5 refs., 4 figs

  16. Beam transport optics for high-power laser systems

    International Nuclear Information System (INIS)

    Taylor, J.R.

    1995-01-01

    Beam transport optics receive output energy from the laser cavity and deliver it to the work site. Depending on the application, this may require a few simple elements or large complex systems. Collection of the laser energy depends on the spatial and temporal energy distribution as well as the wavelength and polarization of the laser cavity and output coupler. Transport optics can perform a variety of functions, including beam formatting, frequency doubling, and distribution to one or more work sites while maintaining or even improving the beam quality. The beam may be delivered to work sites as focused spots or images, projected to distant targets, or propagated through various media for sensing or photochemical processing. Design may involve optical modeling of the system, including diffraction effects and thermal management. A Gaussian beam profile is often used for convenience in modeling. When deviations from this ideal profile need to be considered, it is necessary to characterize the laser beam in detail. Design of the transport system requires understanding of the interaction of the laser energy with optical materials and components. Practical considerations include mounting the optics without stress and with the stability suitable for the intended application. Requirements for beam direction, stability, size, shape, and quality dictate the design approach for each specific situation. Attention also must be given to reliability, environmental, and commercial requirements. Damage to optics in high-power laser systems is a common concern. Environmental problems such as atmospheric turbulence, contamination by dust or vapor from the work site or other sources, or absorption of water vapor can directly degrade beam quality. Other potentially significant optical performance effects may result from instability and aging of the optics, temperature, humidity, pressure, transmitted vibration, and contamination from the work site or other sources

  17. Design of a negative ion neutral beam system for TNS

    International Nuclear Information System (INIS)

    Easoz, J.R.; Sink, D.A.

    1979-01-01

    A design is presented that suggests that a negative ion neutral beam based on direct extraction is applicable to TNS, assuming technological advancements in several areas. Improvements in negative ion sources, direct energy conversion of charged beams, and high speed cryogenic pumping are needed. The increase in efficiency over a positive ion system and the encouraging results of the first attempt at a total design justify increased effort in the development of the above mentioned areas

  18. Beam Collimation and Machine-Detector Interface at the International Linear Collider

    CERN Document Server

    Mokhov, Nikolai V; Kostin, Mikhail A

    2005-01-01

    Synchrotron radiation, spray from the dumps and extraction lines, beam-gas and beam halo interactions with collimators and other components in the ILC beam delivery system create fluxes of muons and other secondaries which can exceed the tolerable levels at a detector by a few orders of magnitude. It is shown that with a multi-stage collimation system, magnetized iron spoilers which fill the tunnel and a set of masks in the detector, one can hopefully meet the design goals. Results of modeling with the STRUCT and MARS15 codes of beam loss and energy deposition effects are presented in this paper. We concentrate on collimation system and mask design and optimization, short- and long-term survivability of the critical components (spoilers, absorbers, magnets, separators, dumps), dynamic heat loads and radiation levels in magnets and other components, machine-related backgrounds and damage in collider detectors, and environmental aspects (prompt dose, ground-water and air activation).

  19. A beam position monitor system for electron cooler in HIRFL-CSR

    International Nuclear Information System (INIS)

    Li Guohong; Li Jie; Yang Xiaodong; Yan Tailai; Ma Xiaoming

    2010-01-01

    The efficient electron cooling requires that the ion beam and electron beam are parallel and overlapped. In order to measure the positions of ion beam and electron beam simultaneously, a beam position monitor system is developed for the HIRFL-CSR electron cooler device, which probe consists of four capacitive cylinder linear-cut poles. One can get the both beam positions from the picking up signals of four poles by using Fourier transform (FFT) method. The measurement results show that the beam position monitor system is accurate. This system is suitable for investigating the relation between electron cooling processing and the angle of ion beam and electron beam. (authors)

  20. Design of the 70 mm twin aperture superconducting quadrupole for the LHC dump insertion

    CERN Document Server

    Kirby, G A; Taylor, T M; Trinquart, G

    1996-01-01

    The LHC dump insertion features a pair of superconducting quadrupoles located on either side of a 340 m long straight section. Two horizontally deflecting kickers, located in between the quadrupole pairs, and a septum in the centre of the insertion, vertically deflect the two counter-rotating beams past the quadrupoles on the downstream sides, and into the dump areas. Due to the layout, the optical ß function in the quadrupoles is around 640 m, the largest around the LHC at injection. The quadrupoles must therefore have enlarged aperture and specially designed cryostats to allow for the safe passage of both the circulating and ejected beams. In this paper we present the design of the twin aperture dump quadrupole based on the 70 mm four layer coil proposed for the LHC low-ß quadrupoles. In preparation for model construction, we report on improvements of the coil design and a study of the retaining structures.

  1. An automatic beam steering system for the NSLS X-17T beam line using closed orbit feedback

    International Nuclear Information System (INIS)

    Nawrocky, R.J.; Ma, Li; Rarback, H.M.; Singh, O.V.; Yu, L.H.

    1987-01-01

    Initial observations of motion of the undulator radiation in the NSLS X-17T beam line clearly indicated that the beam had to be stabilized in both directions to be usable for the planned soft x-ray imaging experiments. The low frequency spectra of beam motion contained peaks in the range from dc to 60 Hz and at higher frequencies. A beam steering system employing closed orbit feedback has been designed and installed to stabilize the beam in both planes. In each plane of motion, beam position is measured with a beam position detector and a correction signal is fed back to a local four magnet orbit bump to dynamically control the angle of the radiation at the source. This paper describes the design and performance of the beam steering system

  2. IFMIF-LIPAc Beam Diagnostics. Profiling and Loss Monitoring Systems

    International Nuclear Information System (INIS)

    Egberts, J.

    2012-01-01

    The IFMIF accelerator will accelerate two 125 mA continuous wave (cw) deuteron beams up to 40 MeV and blasts them onto a liquid lithium target to release neutrons. The very high beam power of 10 MW pose unprecedented challenges for the accelerator development. Therefore, it was decided to build a prototype accelerator, the Linear IFMIF Prototype Accelerator (LIPAc), which has the very same beam characteristic, but is limited to 9 MeV only. In the frame of this thesis, diagnostics devices for IFMIF and LIPAc have been developed. The diagnostics devices consist of beam loss monitors and interceptive as well as non-interceptive profile monitors. For the beam loss monitoring system, ionization chambers and diamond detectors have been tested and calibrated for neutron and γ radiation in the energy range expected at LIPAc. During these tests, for the first time, diamond detectors were successfully operated at cryogenic temperatures. For the interceptive profilers, thermal simulations were performed to ensure safe operation. For the non-interceptive profiler, Ionization Profile Monitors (IPMs) were developed. A prototype has been built and tested, and based on the findings, the final IPMs were designed and built. To overcome the space charge of accelerator beam, a software algorithm was written to reconstruct the actual beam profile. (author) [fr

  3. Antiproton Production beam and Reverse Injection System

    Energy Technology Data Exchange (ETDEWEB)

    Chadwick, G.

    1981-08-16

    The objectives of this project are two fold: (1) To extract high energy protons from the Main Ring (MR) and target them to produce antiprotons which are subsequently captured in the existing Booster accelerator; and (2) to provide a channel for injecting either protons or antiprotons into the MR from the booster in a direction opposite to that of the normal proton acceleration as colliding beams can be created. The present design, therefore, is in support of two separate larger projects, viz., the collisions of protons in the Tevatron (normal circulation direction) with 'reverse injected' protons in the MR, and the collision of normal direction protons with reverse injected antiprotons either in the MR or in the Tevatron. Figure 1 shows the layout of the project area. It spans the shortest distance between possible injection/ejection points in the existing accelerator structures, hence minimizing costs. The tunnel will lie underground at the level of the MR and booster.

  4. Conceptual Design of the Linac4 Main Dump

    CERN Document Server

    Leitao, I V; Maglioni, C

    2012-01-01

    Linac4 is the new CERN linear accelerator intended to replace the ageing Linac2 as the injector to the Proton Synchrotron Booster (PSB) for increasing the luminosity of the Large Hadron Collider (LHC). By delivering a 160MeV H- beam, Linac4 will provide the necessary conditions to double the brightness and intensity of the beam extracted from the PSB. This paper describes the conceptual design of the Linac4 Main Dump, where two different concepts relying respectively on water and air cooling were compared and evaluated. Based on the application of analytical models for the energy deposited by the beam, heat conduction and cooling concepts, a parametric study was performed. This approach allowed the identification of the “optimal” configuration for these two conceptual geometries and their relative comparison. Besides giving the theoretical guidelines for the design of the new dump, this work also contributes to the development of analytical tools to allow a better understanding of the influence of the se...

  5. A set of dosimetry systems for electron beam irradiation

    International Nuclear Information System (INIS)

    Lin Min; Lin Jingwen; Chen Yundong; Li Huazhi; Xiao Zhenhong; Gao Juncheng

    1999-01-01

    To follow the rapid development of radiation processing with electron beams, it is urgent to set up a set of dosimetric standards to provide Quality Assurance (QA) of electron beam irradiation and unify the values of the quality of the absorbed dose measurements for electron beams. This report introduces a set of dosimetry systems established in Radiometrology Center of China Institute of Atomic Energy (RCCIAE), which have been or will be used as dosimetric standards in the Nuclear Industry System (NIS) in China. For instance, the potassium (silver) dichromate and ceric-cerous sulfate dosimetry systems will be used as standard dosimeters, while alanine-ESR dosimetry system as a transfer dosimeter, and FJL-01 CTA as a routine dosimeter. (author)

  6. Effects on the environment of the dumping of nuclear wastes

    International Nuclear Information System (INIS)

    1990-07-01

    Nationally and internationally accepted procedures and technologies are available for the safe handling and disposal of radioactive wastes. Authorized waste disposal practices are designed to ensure that there will be no significant impacts on man and his environment. 'Dumping' of nuclear wastes may result in the elimination of one or more of the multibarriers of protection inherent in an effective radioactive waste management system, thereby increasing the risk of radiological exposure to man and his environment. Quantitative assessments of the degree of environmental contamination and of the resulting hazards to man depend on the specific conditions surrounding the 'uncontrolled disposal' of radioactive waste. These include the nature and activity level of the waste, the physical form of the waste, the package that the waste is contained in and the characteristics of the dumping site. Depending on the scenario envisaged, the consequences of 'uncontrolled disposal' could vary from being insignificant to a situation where there is a significant hazard to an exposed population group. International transactions involving nuclear wastes are taking place between countries on the basis of bilateral agreements and under strict regulatory supervision so that radioactive wastes are transferred safely from one controlled area to another. Such transactions may increase in the future with increased international co-operation in sharing common waste repositories. No evidence exists that confirms that transboundary dumping of radioactive waste has occurred. Investigation of alleged dumping of radioactive wastes by the International Atomic Energy Agency has revealed that the 'suspect wastes' did not contain radioactive material. 2 tabs

  7. A new beam diagnostic system for the MASHA setup

    International Nuclear Information System (INIS)

    Motycak, S.; Kamas, D.; Rodin, A.M.; Novoselov, A.S.; Podshibyakin, A.V.; Belozerov, A.V.; Vedeneyev, V.Yu.; Gulyaev, A.V.; Gulyaeva, A.V.; Salamatin, V.S.; Stepantsov, S.V.; Chernysheva, E.V.; Yukhimchuk, S.A.; Komarov, A.B.; Krupa, L.; Kliman, J.

    2016-01-01

    A new beam diagnostic system based on the PXI standard was developed, tested, and used in the MASHA setup experiment. The beam energy and beam current measurements were carried out using several methods. The online time-of-flight energy measurements were carried out using three pick-up detectors. We used two electronic systems to measure the time between the pick-ups. The first system was based on fast Agilent digitizers (2-channel, 4-GHz sampling rate), and the second one was based on a constant fraction discriminator (CFD) connected to a time-to-digital converter (TDC, 5-ps resolution). A new graphical interface to monitor the electronic devices and to perform the online calculations of energy was developed using MFC C ++. The second system based on microchannel plate (time-of-flight) and silicon detectors for the determination of beam energy and the type of accelerated particles was also used. The beam current measurements were carried out with two different sensors. The first sensor is a rotating Faraday cup placed in front of the target, and the second one is an emission detector installed at the rear of the target. This system is now used in experiments for the synthesis of superheavy elements at the U400M cyclotron of the Flerov Laboratory of Nuclear Reactions (FLNR).

  8. A new beam diagnostic system for the MASHA setup

    Science.gov (United States)

    Motycak, S.; Rodin, A. M.; Novoselov, A. S.; Podshibyakin, A. V.; Krupa, L.; Belozerov, A. V.; Vedeneyev, V. Yu.; Gulyaev, A. V.; Gulyaeva, A. V.; Kliman, J.; Salamatin, V. S.; Stepantsov, S. V.; Chernysheva, E. V.; Yuchimchuk, S. A.; Komarov, A. B.; Kamas, D.

    2016-09-01

    A new beam diagnostic system based on the PXI standard was developed, tested, and used in the MASHA setup experiment. The beam energy and beam current measurements were carried out using several methods. The online time-of-flight energy measurements were carried out using three pick-up detectors. We used two electronic systems to measure the time between the pick-ups. The first system was based on fast Agilent digitizers (2-channel, 4-GHz sampling rate), and the second one was based on a constant fraction discriminator (CFD) connected to a time-to-digital converter (TDC, 5-ps resolution). A new graphical interface to monitor the electronic devices and to perform the online calculations of energy was developed using MFC C++. The second system based on microchannel plate (time-of-flight) and silicon detectors for the determination of beam energy and the type of accelerated particles was also used. The beam current measurements were carried out with two different sensors. The first sensor is a rotating Faraday cup placed in front of the target, and the second one is an emission detector installed at the rear of the target. This system is now used in experiments for the synthesis of superheavy elements at the U400M cyclotron of the Flerov Laboratory of Nuclear Reactions (FLNR).

  9. Doublet III neutral beam multi-stream command language system

    International Nuclear Information System (INIS)

    Campbell, L.; Garcia, J.R.

    1983-01-01

    A multi-stream command language system was developed to provide control of the dual source neutral beam injectors on the Doublet III experiment at GA Technologies Inc. The Neutral Beam command language system consists of three parts: compiler, sequencer, and interactive task. The command language, which was derived from the Doublet III tokamak command language, POPS, is compiled, using a recursive descent compiler, into reverse polish notation instructions which then can be executed by the sequencer task. The interactive task accepts operator commands via a keyboard. The interactive task directs the operation of three input streams, creating commands which are then executed by the sequencer. The streams correspond to the two sources within a Doublet III neutral beam, plus an interactive stream. The sequencer multiplexes the execution of instructions from these three streams. The instructions include reads and writes to an operator terminal, arithmetic computations, intrinsic functions such as CAMAC input and output, and logical instructions. The neutral beam command language system was implemented using Modular Computer Systems (ModComp) Pascal and consists of two tasks running on a ModComp Classic IV computer. The two tasks, the interactive and the sequencer, run independently and communicate using shared memory regions. The compiler runs as an overlay to the interactive task when so directed by operator commands. The system is succesfully being used to operate the three neutral beams on Doublet III

  10. THz computed tomography system with zero-order Bessel beam

    Science.gov (United States)

    Niu, Liting; Wu, Qiao; Wang, Kejia; Liu, Jinsong; Yang, Zhengang

    2018-01-01

    Terahertz (THz) waves can penetrate many optically opaque dielectric materials such as plastics, ceramics and colorants. It is effective to reveal the internal structures of these materials. We have built a THz Computed Tomography (CT) system with 0.3 THz zero-order Bessel beam to improve the depth of focus of this imaging system for the non-diffraction property of Bessel beam. The THz CT system has been used to detect a paper cup with a metal rod inside. Finally, the acquired projection data have been processed by the filtered back-projection algorithm and the reconstructed image of the sample has been obtained.

  11. Measurements of Beam Ion Loss from the Compact Helical System

    International Nuclear Information System (INIS)

    Darrow, D.S.; Isobe, M.; Kondo, Takashi; Sasao, M.

    2010-01-01

    Beam ion loss from the Compact Helical System (CHS) has been measured with a scintillator-type probe. The total loss to the probe, and the pitch angle and gyroradius distributions of that loss, have been measured as various plasma parameters were scanned. Three classes of beam ion loss were observed at the probe position: passing ions with pitch angles within 10o of those of transition orbits, ions on transition orbits, and ions on trapped orbits, typically 15o or more from transition orbits. Some orbit calculations in this geometry have been performed in order to understand the characteristics of the loss. Simulation of the detector signal based upon the following of orbits from realistic beam deposition profiles is not able to reproduce the pitch angle distribution of the losses measured. Consequently it is inferred that internal plasma processes, whether magnetohydrodynamic modes, radial electric fields, or plasma turbulence, move previously confined beam ions to transition orbits, resulting in their loss.

  12. Beam position measurement system at the Fermilab main accelerator

    International Nuclear Information System (INIS)

    Kerns, Q.A.

    1975-01-01

    The beam position system of the Fermilab Main Ring contains one horizontal and one vertical Electrostatic Beam Pickup in each of the 96 cells of the machine. A pair of 75 ohm cables transmits the induced signal from the machine tunnel to the nearest service building. In each of the 24 service buildings, there is a solid-state multiplexer and a beam position detector which processes the A-B signal pairs to produce an intensity-normalized voltage proportional to beam displacement. This voltage is digitized, read into buffer of the Lockheed MAC A, and in turn transferred to the Xerox 530. Horizontal or vertical orbits can be obtained in 50 millisec. Orbits are obtained at injection and at a Main Ring Sample time, if requested, anywhere on the acceleration cycle. Injection orbits can be flattened automatically by a program that sets dipole trim magnets. (auth)

  13. The LEP RF Trip and Beam Loss Diagnostics System

    CERN Document Server

    Arnaudon, L; Beetham, G; Ciapala, Edmond; Juillard, J C; Olsen, R

    2002-01-01

    During the last years of operation the number of operationally independent RF stations distributed around LEP reached a total of 40. A serious difficulty when running at high energy and high beam intensities was to establish cause and effect in beam loss situations, where the trip of any single RF station would result in beam loss, rapidly producing further multiple RF station trips. For the last year of operation a fast post-mortem diagnostics system was developed to allow precise time-stamping of RF unit trips and beam intensity changes. The system was based on eight local DSP controlled fast acquisition and event recording units, one in each RF sector, connected to critical RF control signals and fast beam intensity monitors and synchronised by GPS. The acquisition units were armed and synchronised at the start of each fill. At the end of the fill the local time-stamped RF trip and beam intensity change history tables were recovered, events ordered and the results stored in a database for subsequent analys...

  14. Preliminary design of the pulse generator for the CLIC damping ring extraction system

    CERN Document Server

    Holma, Janne; Ovaska, Seppo

    2011-01-01

    The spent drive beam must be cleanly extracted and bent away from the decelerator axis at the end of each CLIC decelerator in order to leave space for injecting a fresh beam train in the next sector. Then the spent beam must be safely absorbed. A compact extraction system made of a single dipole is proposed. The spent beam is driven to a water dump located at 20m downstream of the extraction point and transversely 6m away of the axis of the main linac. An adequate spread of the beam impact map on the dump offers small temperature excursions in both the dump and its entrance window, allowing for reliable operation and a long lifetime of the system.

  15. Neutron measurements from beam-target reactions at the ELISE neutral beam test facility

    International Nuclear Information System (INIS)

    Xufei, X.; Fan, T.; Nocente, M.; Gorini, G.; Bonomo, F.; Franzen, P.; Fröschle, M.; Grosso, G.; Tardocchi, M.; Grünauer, F.; Pasqualotto, R.

    2014-01-01

    Measurements of 2.5 MeV neutron emission from beam-target reactions performed at the ELISE neutral beam test facility are presented in this paper. The measurements are used to study the penetration of a deuterium beam in a copper dump, based on the observation of the time evolution of the neutron counting rate from beam-target reactions with a liquid scintillation detector. A calculation based on a local mixing model of deuterium deposition in the target up to a concentration of 20% at saturation is used to evaluate the expected neutron yield for comparison with data. The results are of relevance to understand neutron emission associated to beam penetration in a solid target, with applications to diagnostic systems for the SPIDER and MITICA Neutral Beam Injection prototypes

  16. Beam delivery system with a non-digitized diffractive beam splitter for laser-drilling of silicon

    Science.gov (United States)

    Amako, J.; Fujii, E.

    2016-02-01

    We report a beam-delivery system consisting of a non-digitized diffractive beam splitter and a Fourier transform lens. The system is applied to the deep-drilling of silicon using a nanosecond pulse laser in the manufacture of inkjet printer heads. In this process, a circularly polarized pulse beam is divided into an array of uniform beams, which are then delivered precisely to the process points. To meet these requirements, the splitter was designed to be polarization-independent with an efficiency>95%. The optical elements were assembled so as to allow the fine tuning of the effective overall focal length by adjusting the wavefront curvature of the beam. Using the system, a beam alignment accuracy ofbeam array and the throughput was substantially improved (10,000 points on a silicon wafer drilled in ~1 min). This beam-delivery scheme works for a variety of laser applications that require parallel processing.

  17. Large amplitude forced vibration analysis of cross-beam system ...

    African Journals Online (AJOL)

    Large amplitude forced vibration behaviour of cross-beam system under harmonic excitation is studied, incorporating the effect of geometric non-linearity. The forced vibration analysis is carried out in an indirect way, in which the dynamic system is assumed to satisfy the force equilibrium condition at peak load value, thus ...

  18. Lattice design of beam transport system of FELI

    International Nuclear Information System (INIS)

    Miyauchi, Y.; Koga, A.; Morii, Y.; Sato, S.; Keishi, T.; Tomimasu, T.

    1994-01-01

    A plan of lasing wide range FEL (Free Electron Laser) is in progress at FELI. For this purpose, an S-band linac accelerator system of four output energy levels is under construction. This paper describes the lattice design of its beam transport (BT) system. (author)

  19. DATA ACQUISITION FOR SNS BEAM LOSS MONITOR SYSTEM

    International Nuclear Information System (INIS)

    YENG, Y.; GASSNER, D.; HOFF, L.; WITKOVER, R.

    2003-01-01

    The Spallation Neutron Source (SNS) beam loss monitor system uses VME based electronics to measure the radiation produced by lost beam. Beam loss signals from cylindrical argon-filled ion chambers and neutron detectors will be conditioned in analog front-end (AFE) circuitry. These signals will be digitized and further processed in a dedicated VME crate. Fast beam inhibit and low-level, long-term loss warnings will be generated to provide machine protection. The fast loss data will have a bandwidth of 35kHz. While the low level, long-term loss data will have much higher sensitivity. This is further complicated by the 3 decade range of intensity as the Ring accumulates beam. Therefore a bandwidth of 100kHz and dynamic range larger than 21 bits data acquisition system will be required for this purpose. Based on the evaluation of several commercial ADC modules in preliminary design phase, a 24 bits Sigma-Delta data acquisition VME bus card was chosen as the SNS BLM digitizer. An associated vxworks driver and EPICS device support module also have been developed at BNL. Simulating test results showed this system is fully qualified for both fast loss and low-level, long-term loss application. The first prototype including data acquisition hardware setup and EPICS software (running database and OPI clients) will be used in SNS Drift Tube Linac (DTL) system commissioning

  20. TFTR neutral beam systems conceptual design

    International Nuclear Information System (INIS)

    1976-03-01

    The functions, design requirements, and design descriptions of the injection system are described. Cost summaries are given for each system and subsystem. The costs presented are for: materials procurement; and shipping, assembly, and installation at the Princeton site

  1. Tutorial on beam-based feedback systems for linacs

    International Nuclear Information System (INIS)

    Hendrickson, L.; Allison, S.; Gromme, T.; Grossberg, P.; Himel, T.; Krauter, K.; MacKenzie, R.; Ross, M.; Sass, R.; Shoaee, H.

    1994-08-01

    A generalized fast feedback system stabilizes beams in the SLC. It performs measurements and modifies actuator settings to control beam states such as position, angle, energy and intensity on a pulse to pulse basis. An adaptive cascade feature allows communication between a series of linac loops, avoiding overcorrection problems. The system is based on the state space formalism of digital control theory. Due to the database-driven design, new loops are added without requiring software modifications. Recent enhancements support the monitoring and control of nonlinear states such as beam phase using excitation techniques. In over three years of operation, the feedback system has grown from its original eight loops to more than fifty loops, and it has been invaluable in stabilizing the machine

  2. Current Status of the Beam Position Monitoring System at TLS

    Science.gov (United States)

    Kuo, C. H.; Hu, K. H.; Chen, Jenny; Lee, Demi; Wang, C. J.; Hsu, S. Y.; Hsu, K. T.

    2006-11-01

    The beam position monitoring system is an important part of a synchrotron light source that supports its routine operation and studies of beam physics. The Taiwan light source is equipped with 59 BPMs. Highly precise closed orbits are measured by multiplexing BPMs. Data are acquired using multi-channel 16-bit ADC modules. Orbit data are sampled every millisecond. Fast orbit data are shared in a reflective memory network to support fast orbit feedback. Averaged data were updated to control database at a rate of 10 Hz. A few new generation digital BPMs were tested to evaluate their performance and functionality. This report summarizes the system structure, the software environment and the preliminary beam test of the BPM system.

  3. Preservation of beam loss induced quenches, beam lifetime and beam loss measurements with the HERA-p beam-loss-monitor system

    International Nuclear Information System (INIS)

    Wittenburg, K.

    1994-01-01

    The beam-loss-monitors (BLMs) in the HERA-Proton-ring (HERAp) must fulfil the following requirements: They have to measure losses sensitive and fast enough to prevent the superconducting magnets from beam loss induced quenching; the dynamic range of the monitors must exceed several decades in order to measure losses during beam lifetimes of hundreds of hours as well as the much stronger losses that may quench superconducting magnets; they have to be insensitive to the synchrotron radiation of the adjacent electron-ring (HERAe); and their radiation hardness must allow a monitor-lifetime of a few years of HERA operation. These requirements are well satisfied by the HERAp-BLM-System. (orig.)

  4. Beam Tests of a New Digital Beam Control System for the CERN LEIR Accelerator

    CERN Document Server

    Angoletta, Maria Elena; Blas, Alfred; De Long, Joseph; Findlay, Alan; Matuszkiewicz, Pawel; Pedersen, Flemming; Salom-Sarasqueta, Angela

    2005-01-01

    The Low Energy Ion Ring (LEIR) is a major component in the Large Hadron Collider ion injector chain. We have been developing an all-digital beam control and cavity servo system for the RF acceleration in LEIR. The system is housed by VME motherboards that may hold various daughter boards. Fast tasks are executed in Field Programmable Gate Arrays (FPGAs), slower tasks and communication with the software layer above are achieved in Digital Signal Processors (DSPs). We describe a simplified system prototype, which we tested with low intensity beams on the CERN PS Booster (PSB). The aim was to verify the combined DSP+FPGA architecture and the feedback loop dynamics. An additional goal was to deploy and validate novel software concepts, such as reference-functions and timings generation, and user-selectable digital data acquisition.

  5. Fast feedback system for energy and beam stabilization

    International Nuclear Information System (INIS)

    R. Dickson; V. Lebedev

    1999-01-01

    The electron beams being delivered to targets of the Continuous Electron Beam Accelerator Facility (CEBAF) at Thomas Jefferson National Accelerator Facility (Jefferson Lab) are plagued with undesirable positional and energy fluctuations. These fluctuations primarily occur at harmonics of the power line frequency (60, 120, 180, etc. hertz), and their cause is rooted in electromagnetic fields generated by accelerator electronic equipment. It is possible to largely nullify these deviations by applying real time corrections to electromagnets and RF verniers along the beam line. This concept has been successfully applied at Jefferson Lab by extensively modifying the existing Beam Position Monitor (BPM) system with the integration of an algorithm that computes correction signals targeted at the power line harmonics. Many of the modifications required were due to the existing CEBAF BPM system not having the data acquisition bandwidth needed for this type of feedback system. This paper will describe the techniques required to transform the CEBAF standard BPM system into a high speed practical fast feedback system that coexists with the large scale control system--the Experimental Physics and Industrial Control System (EPICS)--that runs the CEBAF accelerator in daily operation

  6. A Versatile Beam Loss Monitoring System for CLIC

    CERN Document Server

    Kastriotou, Maria; Farabolini, Wilfrid; Holzer, Eva Barbara; Nebot Del Busto, Eduardo; Tecker, Frank; Welsch, Carsten

    2016-01-01

    The design of a potential CLIC beam loss monitoring (BLM) system presents multiple challenges. To successfully cover the 48 km of beamline, ionisation chambers and optical fibre BLMs are under investigation. The former fulfils all CLIC requirements but would need more than 40000 monitors to protect the whole facility. For the latter, the capability of reconstructing the original loss position with a multi-bunch beam pulse and multiple loss locations still needs to be quantified. Two main sources of background for beam loss measurements are identified for CLIC. The two-beam accelerator scheme introduces so-called crosstalk, i.e. detection of losses originating in one beam line by the monitors protecting the other. Moreover, electrons emitted from the inner surface of RF cavities and boosted by the high RF gradients may produce signals in neighbouring BLMs, limiting their ability to detect real beam losses. This contribution presents the results of dedicated experiments performed in the CLIC Test Facility to qu...

  7. The Automation Control System Design of Walking Beam Heating Furnace

    Directory of Open Access Journals (Sweden)

    Hong-Yu LIU

    2014-10-01

    Full Text Available Combining the transformation project of certain strip steel rolling production line, the techniques process of walking beam heating furnace was elaborated in this paper. The practical application of LOS-T18-2ZC1 laser detector was elaborated. The network communication model of walking beam heating furnace control system was designed. The realization method of production process automation control was elaborated. The entire automation control system allocation picture and PLC power distribution system picture of walking beam heating furnace were designed. Charge machine movement process was elaborated. Walking beam movement process was elaborated. Extractor movement process was elaborated. The hydraulic station of walking mechanism was elaborated. Relative control circuit diagram was designed. The control function of parallel shift motor, uplifted and degressive motor was elaborated. The control circuit diagram of parallel shift motor of charge machine and extractor of first heating furnace was designed. The control circuit diagram of uplifted and degressive motor of charge machine and extractor of first heating furnace was designed. The realization method of steel blank length test function was elaborated. The realization method of tracking and sequence control function of heating furnace field roller were elaborated. The design provides important reference base for enhancing walking beam heating furnace control level.

  8. The Beam Loss Detection System of the LHC Ring

    CERN Document Server

    Gschwendtner, E; Ferioli, G; Friesenbichler, W; Kain, V

    2002-01-01

    At the Large Hadron Collider (LHC) a beam loss system will be installed in the arc, dispersion suppressor and the straight regions for a continuous surveillance of particle losses. These beam particles deposit their energy partially in the super-conducting coils leading to temperature increase, possible magnet quenches and damages. The primary and secondary halo of the beam is absorbed by the collimation system. The tertiary halo will be lost at aperture limits in the ring. Its loss distribution along the magnets has been studies. At the positions, where most of the beam losses are expected, simulations of the particle fluences outside the cryostat and induced by lost protons at the aperture have been performed with the Monte Carlo Code Geant 3.2.1. This allows determining the most suitable positions of the detectors, the needed number of monitors and the impact on the dynamic range of the detectors. The design of the beam loss monitor system is presented that meet the required sensitivity, dynamic range and ...

  9. Resolution of a High Performance Cavity Beam Position Monitor System

    International Nuclear Information System (INIS)

    Walston, S.; Chung, C.; Fitsos, P.; Gronberg, J.; Ross, M.; Khainovski, O.; Kolomensky, Y.; Loscutoff, P.; Slater, M.; Thomson, M.; Ward, D.; Boogert, S.; Vogel, V.; Meller, R.; Lyapin, A.; Malton, S.; Miller, D.; Frisch, J.; Hinton, S.; May, J.; McCormick, D.; Smith, S.; Smith, T.; White, G.; Orimoto, T.; Hayano, H.; Honda, Y.; Terunuma, N.; Urakawa, J.

    2005-01-01

    International Linear Collider (ILC) interaction region beam sizes and component position stability requirements will be as small as a few nanometers. It is important to the ILC design effort to demonstrate that these tolerances can be achieved - ideally using beam-based stability measurements. It has been estimated that RF cavity beam position monitors (BPMs) could provide position measurement resolutions of less than one nanometer and could form the basis of the desired beam-based stability measurement. We have developed a high resolution RF cavity BPM system. A triplet of these BPMs has been installed in the extraction line of the KEK Accelerator Test Facility (ATF) for testing with its ultra-low emittance beam. A metrology system for the three BPMs was recently installed. This system employed optical encoders to measure each BPM's position and orientation relative to a zero-coefficient of thermal expansion carbon fiber frame and has demonstrated that the three BPMs behave as a rigid-body to less than 5 nm. To date, we have demonstrated a BPM resolution of less than 20 nm over a dynamic range of +/- 20 microns

  10. Geometric calibration method for multiple head cone beam SPECT systems

    International Nuclear Information System (INIS)

    Rizo, Ph.; Grangeat, P.; Guillemaud, R.; Sauze, R.

    1993-01-01

    A method is presented for performing geometric calibration on Single Photon Emission Tomography (SPECT) cone beam systems with multiple cone beam collimators, each having its own orientation parameters. This calibration method relies on the fact that, in tomography, for each head, the relative position of the rotation axis and of the collimator does not change during the acquisition. In order to ensure the method stability, the parameters to be estimated in intrinsic parameters and extrinsic parameters are separated. The intrinsic parameters describe the acquisition geometry and the extrinsic parameters position of the detection system with respect to the rotation axis. (authors) 3 refs

  11. An Expert System For Tuning Particle-Beam Accelerators

    Science.gov (United States)

    Lager, Darrel L.; Brand, Hal R.; Maurer, William J.; Searfus, Robert M.; Hernandez, Jose E.

    1989-03-01

    We have developed a proof-of-concept prototype of an expert system for tuning particle beam accelerators. It is designed to function as an intelligent assistant for an operator. In its present form it implements the strategies and reasoning followed by the operator for steering through the beam transport section of the Advanced Test Accelerator at Lawrence Livermore Laboratory's Site 300. The system is implemented in the language LISP using the Artificial Intelligence concepts of frames, daemons, and a representation we developed called a Monitored Decision Script.

  12. Development of global data warehouse for beam diagnostics at SSRF

    International Nuclear Information System (INIS)

    Lai Longwei; Leng Yongbin; Yan Yingbing; Chen Zhichu

    2015-01-01

    The beam diagnostic system is adequate during the daily operation and machine study at the Shanghai Synchrotron Radiation Facility (SSRF). Without the effective event detecting mechanism, it is difficult to dump and analyze abnormal phenomena such as the global orbital disturbance, the malfunction of the BPM and the noise of the DCCT. The global beam diagnostic data warehouse was built in order to monitor the status of the accelerator and the beam instruments. The data warehouse was designed as a Soft IOC hosted on an independent server. Once abnormal phenomena happen it will be triggered and will store the relevant data for further analysis. The results show that the data warehouse can detect abnormal phenomena of the machine and the beam diagnostic system effectively, and can be used for calculating confidential indicators of the beam instruments. It provides an efficient tool for the improvement of the beam diagnostic system and accelerator. (authors)

  13. Electronics and Calibration system for the CMS Beam Halo Monitor

    CERN Document Server

    Tosi, Nicolò; Fabbri, Franco L; Finkel, Alexey; Orfanelli, Stella; Loos, R; Montanari, Alessandro; Rusack, R; Stickland, David P

    2014-01-01

    In the context of increasing luminosity of LHC, it will be important to accurately measure the Machine Induced Background. A new monitoring system will be installed in the cavern of the Compact Muon Solenoid (CMS) experiment for measuring the beam background at high radius. This detector is composed of synthetic quartz Cherenkov radiators, coupled to fast photomultiplier tubes (PMT). The readout chain of this detector will make use of many components developed for the Phase 1 upgrade to the CMS Hadron Calorimeter electronics, with a dedicated firmware and readout adapted to the beam monitoring requirements. The PMT signal will be digitized by a charge integrating ASIC (QIE10), providing both the signal rise time and the charge integrated over one bunch crossing. The backend electronics will record bunch-by-bunch histograms, which will be published to CMS and the LHC using the newly designed CMS beam instrumentation specific DAQ. A calibration monitoring system has been designed to generate triggered pulses of...

  14. Model calibration and beam control systems for storage rings

    International Nuclear Information System (INIS)

    Corbett, W.J.; Lee, M.J.; Ziemann, V.

    1993-04-01

    Electron beam storage rings and linear accelerators are rapidly gaining worldwide popularity as scientific devices for the production of high-brightness synchrotron radiation. Today, everybody agrees that there is a premium on calibrating the storage ring model and determining errors in the machine as soon as possible after the beam is injected. In addition, the accurate optics model enables machine operators to predictably adjust key performance parameters, and allows reliable identification of new errors that occur during operation of the machine. Since the need for model calibration and beam control systems is common to all storage rings, software packages should be made that are portable between different machines. In this paper, we report on work directed toward achieving in-situ calibration of the optics model, detection of alignment errors, and orbit control techniques, with an emphasis on developing a portable system incorporating these tools

  15. Instrumentation system for long-pulse MFTF neutral beams

    International Nuclear Information System (INIS)

    Risch, D.M.

    1981-01-01

    The instrumentation system for long pulse neutral beams for MFTFS consists of monitoring and protective circuitry. Global synchronization of high speed monitoring data across twenty-four neutral beams is achieved via an experiment wide fiber optic timing system. Fiber optics are also used as a means of isolating signals at elevated voltages. An excess current monitor, interrupt monitor, sparkdown detector, spot detector and gradient grid ratio detector form the primary protection for the neutral beam source. A unique hierarchical interlocking scheme allows other protective devices to be factored into the shutdown circuitry of the power supply so that the initiating cause of a shutdown can be isolated and even allows some non-critical devices to be safely ignored for a period of time

  16. D0 Superconducting Solenoid Quench Data and Slow Dump Data Acquisition

    International Nuclear Information System (INIS)

    Markley, D.

    1998-01-01

    This Dzero Engineering note describes the method for which the 2 Tesla Superconducting Solenoid Fast Dump and Slow Dump data are accumulated, tracked and stored. The 2 Tesla Solenoid has eleven data points that need to be tracked and then stored when a fast dump or a slow dump occur. The TI555(Texas Instruments) PLC(Programmable Logic Controller) which controls the DC power circuit that powers the Solenoid, also has access to all the voltage taps and other equipment in the circuit. The TI555 constantly logs these eleven points in a rotating memory buffer. When either a fast dump(dump switch opens) or a slow dump (power supply turns off) occurs, the TI555 organizes the respective data and will down load the data to a file on DO-CCRS2. This data in this file is moved over ethernet and is stored in a CSV (comma separated format) file which can easily be examined by Microsoft Excel or any other spreadsheet. The 2 Tesla solenoid control system also locks in first fault information. The TI555 decodes the first fault and passes it along to the program collecting the data and storing it on DO-CCRS2. This first fault information is then part of the file.

  17. Development of KOMAC Beam Monitoring System Using EPICS

    Energy Technology Data Exchange (ETDEWEB)

    Song, Young-Gi; Yun, Sang-Pil; Kim, Han-Sung; Kwon, Hyeok-Jung; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    The beam loss signals must be digitized and the sampling has to be synchronized to a reference signal which is an external trigger for beam operation. The digitized data must be accessible by the Experimental Physics and Industrial Control System (EPICS)-based control system, which manages the whole accelerator control. In order to satisfy the requirement, an Input /Output Controller (IOC), which runs Linux on a CPU module with PCI express based Analog to Digital Converter (ADC) modules, has been adopted. An associated linux driver and EPICS device support module also have been developed. The IOC meets the requirements and the development and maintenance of the software for the IOC is considerably efficient. The data acquisition system running EPICS will be used in increasing phase of KOrea Multi-purpose Accelerator Complex (KOMAC) beam power. The beam monitoring system integrates BLM and BPM signals into control system and offers real-time data to operators. The IOC, which is implemented with Linux and PCI driver, has supported data acquisition as a very flexible solution.

  18. Development of KOMAC Beam Monitoring System Using EPICS

    International Nuclear Information System (INIS)

    Song, Young-Gi; Yun, Sang-Pil; Kim, Han-Sung; Kwon, Hyeok-Jung; Cho, Yong-Sub

    2014-01-01

    The beam loss signals must be digitized and the sampling has to be synchronized to a reference signal which is an external trigger for beam operation. The digitized data must be accessible by the Experimental Physics and Industrial Control System (EPICS)-based control system, which manages the whole accelerator control. In order to satisfy the requirement, an Input /Output Controller (IOC), which runs Linux on a CPU module with PCI express based Analog to Digital Converter (ADC) modules, has been adopted. An associated linux driver and EPICS device support module also have been developed. The IOC meets the requirements and the development and maintenance of the software for the IOC is considerably efficient. The data acquisition system running EPICS will be used in increasing phase of KOrea Multi-purpose Accelerator Complex (KOMAC) beam power. The beam monitoring system integrates BLM and BPM signals into control system and offers real-time data to operators. The IOC, which is implemented with Linux and PCI driver, has supported data acquisition as a very flexible solution

  19. A molecular beam/quadrupole mass spectrometer system with synchronized beam modulation and digital waveform analysis

    Science.gov (United States)

    Pellett, G. L.; Adams, B. R.

    1983-01-01

    A performance evaluation is conducted for a molecular beam/mass spectrometer (MB/MS) system, as applied to a 1-30 torr microwave-discharge flow reactor (MWFR) used in the formation of the methylperoxy radical and a study of its subsequent destruction in the presence or absence of NO(x). The modulated MB/MS system is four-staged and differentially pumped. The results obtained by the MWFR study is illustrative of overall system performance, including digital waveform analysis; significant improvements over previous designs are noted in attainable S/N ratio, detection limit, and accuracy.

  20. Neutral beam control systems for the Tandem Mirror Experiment

    International Nuclear Information System (INIS)

    Ross, R.I.

    1979-01-01

    The Tandem Mirror Experiment (TMX) is presently developing the technology and approaches which will be used in larger fusion systems. This paper describes some of the designs which were used in creating the control system for the TMX neutral beams. To create a system of controls that would work near these large, rapid switching current sources required a mixture of different technologies: fiberoptic data transmission, printed circuit and wirewrap techniques, etc

  1. Solid waste dumping site suitability analysis using geographic ...

    African Journals Online (AJOL)

    Solid waste dumping is a serious problem in the urban areas because most solid wastes are not dumped in the suitable areas. Bahir Dar Town has the problem of solid waste dumping site identification. The main objective of this study was to select potential areas for suitable solid waste dumping sites for Bahir Dar Town, ...

  2. ESRF synchrotron injector beam position monitor system

    International Nuclear Information System (INIS)

    Scheidt, K.; Loyer, F.

    1992-01-01

    The complete lay-out of the BPM system which comprises 75 individual stations is presented from electro-static button signals down to the user level of the computer interface. The design of the electrode button and the block geometry is presented. The timing and the data-acquisition electronics permit precisely timed measurements to be taken simultaneously on all 75 BPM stations at a rate of 1 KHz. The results of this BPM system, are summarised with the performance characteristics of resolution, precision and reproductibility. (author) 4 refs.; 4 figs

  3. X-ray beam-position feedback system with easy-to-use beam-position monitor.

    Science.gov (United States)

    Park, Jae Yeon; Kim, Yesul; Lee, Sangsul; Lim, Jun

    2018-05-01

    X-ray beam-position stability is indispensable in cutting-edge experiments using synchrotron radiation. Here, for the first time, a beam-position feedback system is presented that utilizes an easy-to-use X-ray beam-position monitor incorporating a diamond-fluorescence screen. The acceptable range of the monitor is above 500 µm and the feedback system maintains the beam position within 3 µm. In addition to being inexpensive, the system has two key advantages: it works without a scale factor for position calibration, and it has no dependence on X-ray energy, X-ray intensity, beam size or beam shape.

  4. A technique for aligning sextupole systems using beam optics

    International Nuclear Information System (INIS)

    Chao, Yu-Chiu.

    1992-03-01

    A technique for beam based alignment of sextupole system is developed exploiting the enhancement effect of orbit differences by the sextupoles. This technique can in principle be applied to sextupole or sextupole strings with controlled orbit pattern and BPM configurations. This paper will discuss the theoretical basis, special optimization considerations and expected accuracy. Application to the SLC final focus is also discussed

  5. Beam excitation and damping with the transverse feedback system

    International Nuclear Information System (INIS)

    Pellegrin, J.L.; Rees, J.R.

    1979-08-01

    The questions often come up, ''What is the strength if the beam excitation system? How much damping can the transverse feedback provide?'' The design is now advanced enough to answer these questions; also, laboratory tests of some components have been conducted and we know what can be expected of the hardware. This paper discusses these questions

  6. Doublet III neutral beam multi-stream command language system

    International Nuclear Information System (INIS)

    Campbell, L.; Garcia, J.R.

    1983-12-01

    A multi-stream command language system was developed to provide control of the dual source neutral beam injectors on the Doublet III experiment at GA Technologies Inc. The Neutral Beam command language system consists of three parts: compiler, sequencer, and interactive task. The command language, which was derived from the Doublet III tokamak command language, POPS, is compiled, using a recursive descent compiler, into reverse polish notation instructions which then can be executed by the sequencer task. The interactive task accepts operator commands via a keyboard. The interactive task directs the operation of three input streams, creating commands which are then executed by the sequencer. The streams correspond to the two sources within a Doublet III neutral beam, plus an interactive stream. The sequencer multiplexes the execution of instructions from these three streams. The instructions include reads and writes to an operator terminal, arithmetic computations, intrinsic functions such as CAMAC input and output, and logical instructions. The neutral beam command language system was implemented using Modular Computer Systems (ModComp) Pascal and consists of two tasks running on a ModComp Classic IV computer

  7. Multiple-beam LDV system for buried landmine detection

    Science.gov (United States)

    Lal, Amit K.; Zhang, Hansheng; Aranchuk, Vyacheslav; Hurtado, Ernesto; Hess, Cecil F.; Burgett, Richard D.; Sabatier, James M.

    2003-09-01

    This paper discusses the performance and experimental results of a multiple beam laser Doppler vibrometer designed to locate buried landmines with the laser-acoustic technique. The device increases the speed of landmine detection by simultaneously probing 16 positions on the ground over a span of 1 meter, and measuring the ground velocity at each of these positions. Experimental results are presented from controlled laboratory experiments as well as from landmine test lanes at the University of Mississippi. In the mine lanes, the multiple beam system is raised to a height of 2.5 meters with a forklift, with the 16 beams spread over a 1 meter line along the mine lane. A motor system then allows the 16 beams to be translated across the mine lane, enabling the system to scan a 1 x 1 meter area in a much shorter time than with previous scanning techniques. The effects of experimental parameters such as platform motion, angle of incidence, speckle dropout, and system depth-of-field will be presented and discussed.

  8. System effects influencing the bending strength of timber beams

    DEFF Research Database (Denmark)

    Ditlevsen, Ove Dalager; Källsner, B.

    1998-01-01

    A stochastic model of hierarchical series system type for the bending strength of spruce beams isdefined from the anticipation that the bending failure takes place at a cross-section with a defect cluster formed by knots or grain irregularities. The parameters of the model are estimated from meas...

  9. Measuring and recording system for electron beam welding parameters

    International Nuclear Information System (INIS)

    Lobanova, N.G.; Lifshits, M.L.; Efimov, I.I.

    1987-01-01

    The observation possibility during electron beam welding of circular articles with guaranteed clearance of welding bath leading front in joint gap and flare cloud over the bath by means of television monitor is considered. The composition and operation mode of television measuring system for metric characteristics of flare cloud and altitude of welding bath leading front in the clearance are described

  10. Beam Diagnostics Systems for the National Ignition Facility

    International Nuclear Information System (INIS)

    Demaret, R D; Boyd, R D; Bliss, E S; Gates, A J; Severyn, J R

    2001-01-01

    The National Ignition Facility (NIF) laser focuses 1.8 megajoules of ultraviolet light (wavelength 351 nanometers) from 192 beams into a 600-micrometer-diameter volume. Effective use of this output in target experiments requires that the power output from all of the beams match within 8% over their entire 20-nanosecond waveform. The scope of NIF beam diagnostics systems necessary to accomplish this task is unprecedented for laser facilities. Each beamline contains 110 major optical components distributed over a 510-meter path, and diagnostic tolerances for beam measurement are demanding. Total laser pulse energy is measured with 2.8% precision, and the interbeam temporal variation of pulse power is measured with 4% precision. These measurement goals are achieved through use of approximately 160 sensor packages that measure the energy at five locations and power at three locations along each beamline using 335 photodiodes, 215 calorimeters, and 36 digitizers. Successful operation of such a system requires a high level of automation of the widely distributed sensors. Computer control systems provide the basis for operating the shot diagnostics with repeatable accuracy, assisted by operators who oversee system activities and setup, respond to performance exceptions, and complete calibration and maintenance tasks

  11. Longitudinal beam instabilities in a double RF system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00229208; Gazis, Evangelos

    Operation with a double RF system is essential for many accelerators in order to increase beam stability, to change the bunch shape or to perform various RF manipulations. This is also the case for the operation of the CERN SPS as the LHC proton injector, where in addition to the main RF system, a fourth harmonic RF system is used in bunch shortening mode in order to increase the synchrotron frequency spread inside the bunch and thus to enhance Landau damping of the collective instabilities. In fact the double RF system operation in the SPS is one of the essential means, together with the controlled longitudinal emittance blow-up to significantly increase the longitudinal instability thresholds (single and multi-bunch) and deliver a good quality beam for the LHC. However, for the HiLumi-LHC (HL-LHC) and LHC injector upgrade (LIU) projects higher beam intensities are required. After all upgrades are in place, the main performance limitations of the LHC injector complex are beam instabilities and high intensity...

  12. Polarimeters and energy spectrometers for the ILC beam delivery system

    Energy Technology Data Exchange (ETDEWEB)

    Boogert, S. [London Univ. (United Kingdom). Royal Holloway; Hildreth, M. [Univ. of Notre Dame (United States); Kaefer, K. [DESY, Hamburg (Germany); DESY, Zeuthen (DE)] (and others)

    2009-02-15

    This article gives an overview of current plans and issues for polarimeters and energy spectrometers in the Beam Delivery System of the ILC. It is meant to serve as a useful reference for the Detector Letter of Intent documents currently being prepared. (orig.)

  13. High slope waste dumps – a proven possibility

    Directory of Open Access Journals (Sweden)

    Igor Svrkota

    2013-11-01

    Full Text Available This paper is an overview of dumping operations on High Slope Waste Dump at Veliki Krivelj open pit copper mine, RTB Bor, Serbia. The High Slope Waste Dump in Bor is the highest single slope waste dump in the world with the slope height of 405 m. The paper gives the basics and limitations of the designed dumping technology, the redesigned technology, gives an overview of the 13 year long operation and gathered experiences and addresses the main issues of dumping operations in high slope conditions as well as the present condition of the High Slope Waste Dump.

  14. Rapid Process to Generate Beam Envelopes for Optical System Analysis

    Science.gov (United States)

    Howard, Joseph; Seals, Lenward

    2012-01-01

    The task of evaluating obstructions in the optical throughput of an optical system requires the use of two disciplines, and hence, two models: optical models for the details of optical propagation, and mechanical models for determining the actual structure that exists in the optical system. Previous analysis methods for creating beam envelopes (or cones of light) for use in this obstruction analysis were found to be cumbersome to calculate and take significant time and resources to complete. A new process was developed that takes less time to complete beam envelope analysis, is more accurate and less dependent upon manual node tracking to create the beam envelopes, and eases the burden on the mechanical CAD (computer-aided design) designers to form the beam solids. This algorithm allows rapid generation of beam envelopes for optical system obstruction analysis. Ray trace information is taken from optical design software and used to generate CAD objects that represent the boundary of the beam envelopes for detailed analysis in mechanical CAD software. Matlab is used to call ray trace data from the optical model for all fields and entrance pupil points of interest. These are chosen to be the edge of each space, so that these rays produce the bounding volume for the beam. The x and y global coordinate data is collected on the surface planes of interest, typically an image of the field and entrance pupil internal of the optical system. This x and y coordinate data is then evaluated using a convex hull algorithm, which removes any internal points, which are unnecessary to produce the bounding volume of interest. At this point, tolerances can be applied to expand the size of either the field or aperture, depending on the allocations. Once this minimum set of coordinates on the pupil and field is obtained, a new set of rays is generated between the field plane and aperture plane (or vice-versa). These rays are then evaluated at planes between the aperture and field, at a

  15. Daily check of the electron beams with a diode system

    Energy Technology Data Exchange (ETDEWEB)

    Pilette, P [Hospital Civil de Charleroi (Belgium). Centre for Radiotherapy

    1995-12-01

    A fast systems to check all the accelerator beams on a daily basis has been developed. A cheap home-made detector, based on non-medical diodes (type 1N5408), has been used since July 1992 to verify all the electron beams every day. The relative energy and Top-cGy correspondence is verified with one single irradiation of less than 1 minute by 6 diodes fixed in a polystyrene phantom. The principle of construction, software implementation and results are presented.

  16. Applications of FASTBUS to beam diagnostics and experiment data systems

    International Nuclear Information System (INIS)

    Machen, D.R.

    1983-01-01

    A five-year effort by the North American NIM Committee, in collaboration with the ESONE Committee of European Laboratories, has resulted in a specification for the FASTBUS modular high-speed data-acquisition system. The system is designed around an emitter-coupled logic (ECL) 32-bit data bus for asynchronous data transmission at 100 ns per transaction. Initial applications of FASTBUS will be in experiment data systems at accelerator facilities worldwide--beam diagnostic data systems on the accelerator side and particle-beam experiment data systems in the experimental area. As the specification (and the resulting hardware and software) matures, real-time machine-control applications will become possible. This paper discusses the near-term use of FASTBUS in accelerator beam-diagnostics instrumentation systems, where an extra increment in system throughput and front-end processing speed can produce a greater understanding of the physical phenomena under study. The arguments and conclusions may be equally well applied to other similar data-handling problems requiring high bandwidth in the data system

  17. A beam radiation monitoring and protection system for AGS secondary beams

    International Nuclear Information System (INIS)

    Levine, G.S.

    1978-01-01

    A commercially available radiation monitor using a scintillation detector was modified for charged particle beam monitoring. The device controls access to secondary beams of the AGS and limits beam intensity

  18. Method of laser beam coding for control systems

    Science.gov (United States)

    Pałys, Tomasz; Arciuch, Artur; Walczak, Andrzej; Murawski, Krzysztof

    2017-08-01

    The article presents the method of encoding a laser beam for control systems. The experiments were performed using a red laser emitting source with a wavelength of λ = 650 nm and a power of P ≍ 3 mW. The aim of the study was to develop methods of modulation and demodulation of the laser beam. Results of research, in which we determined the effect of selected camera parameters, such as image resolution, number of frames per second on the result of demodulation of optical signal, is also shown in the paper. The experiments showed that the adopted coding method provides sufficient information encoded in a single laser beam (36 codes with the effectiveness of decoding at 99.9%).

  19. Design of automatic tracking system for electron beam welding

    International Nuclear Information System (INIS)

    He Chengdan; Chinese Academy of Space Technology, Lanzhou; Li Heqi; Li Chunxu; Ying Lei; Luo Yan

    2004-01-01

    The design and experimental process of an automatic tracking system applied to local vacuum electron beam welding are dealt with in this paper. When the annular parts of an exactitude apparatus were welded, the centre of rotation of the electron gun and the centre of the annular weld are usually not superposed because of the machining error, workpiece's setting error and so on. In this teaching process, a little bundle of electron beam is used to scan the weld groove, the amount of the secondary electrons reflected from the workpiece is different when the electron beam scans the both sides and the centre of the weld groove. The difference can indicate the position of the weld and then a computer will record the deviation between the electron beam spot and the centre of the weld groove. The computer will analyze the data and put the data into the storage software. During the welding process, the computer will modify the position of the electron gun based on the deviation to make the electron beam spot centered on the annular weld groove. (authors)

  20. Pulsed system for obtaining microdosimetric data with high intensity beams

    International Nuclear Information System (INIS)

    Zaider, M.; Dicello, J.F.; Hiebert, R.D.

    1977-01-01

    The use of heavy particle accelerators for radiation therapy requires high intensity beams in order to produce useful dose rates. The 800-MeV proton beam at LAMPF passes through different production targets to generate secondary pion beams. Conventional microdosimetric techniques are not applicable under these conditions because exceedingly high count rates result in detector damage, gas breakdown, and saturation effects in the electronics. We describe a new microdosimetric system developed at the Pion Biomedical Channel of LAMPF. The accelerator provides a variable low intensity pulse once every ten high intensity macropulses. The voltage on the detector is pulsed in coincidence with the low intensity pulse so that we were able to operate the detector under optimum data-taking conditions. A low noise two-stage preamplifier was built in connection with the pulsed mode operation. A comparison is made between data obtained in pulsed (high intensity beam) and unpulsed (low intensity beam) modes. The spectra obtained by the two methods agree within the experimental uncertainties

  1. Hydrogen ion species analysis and related neutral beam injection power assessment in the Heliotron E neutral beam injection system

    International Nuclear Information System (INIS)

    Sano, Fumimichi; Obiki, Tokuhiro; Sasaki, Akihiko; Iiyoshi, Atsuo; Uo, Koji

    1982-01-01

    The hydrogen ion species in a Heliotron E neutral beam injection system of maximum electric power 6.3 MW were analyzed in order to assess the neutral beam power injected into the torus. The masimum p roton ratio of the cylindrical bucket type ion source used was observed to be more than 90 percent assuming that the angular divergences for the respective species in the beam are the same. The experimental data are compared with calculations using a particle balance model. The analysis indicates that the net injection power reaches nearly 2.7 MW at the optimal conditions of the system considering the geometrical limitation of the neutral beam path. (author)

  2. Ion beam induced fluorescence imaging in biological systems

    International Nuclear Information System (INIS)

    Bettiol, Andrew A.; Mi, Zhaohong; Vanga, Sudheer Kumar; Chen, Ce-belle; Tao, Ye; Watt, Frank

    2015-01-01

    Imaging fluorescence generated by MeV ions in biological systems such as cells and tissue sections requires a high resolution beam (<100 nm), a sensitive detection system and a fluorescent probe that has a high quantum efficiency and low bleaching rate. For cutting edge applications in bioimaging, the fluorescence imaging technique needs to break the optical diffraction limit allowing for sub-cellular structure to be visualized, leading to a better understanding of cellular function. In a nuclear microprobe this resolution requirement can be readily achieved utilizing low beam current techniques such as Scanning Transmission Ion Microscopy (STIM). In recent times, we have been able to extend this capability to fluorescence imaging through the development of a new high efficiency fluorescence detection system, and through the use of new novel fluorescent probes that are resistant to ion beam damage (bleaching). In this paper we demonstrate ion beam induced fluorescence imaging in several biological samples, highlighting the advantages and challenges associated with using this technique

  3. E-Beam - a new transfer system for isolator technology

    International Nuclear Information System (INIS)

    Sadat, Theo; Huber, Thomas

    2002-01-01

    In every aseptic filling application, the sterile transfer of goods into the aseptic area is a challenge, and there are many different ways to do it. With isolator technology a higher sterility assurance level (SAL) is achieved. This SAL is only as good as the weakest segment in the chain of manufacturing. The transfer of goods into and out of the isolator is one of these critical segments. Today different techniques, some already well established, others still very new, are available on the market like: dry heat tunnel, autoclave, pulsed light, rapid transfer systems (RTP), H 2 O 2 tunnel, UV light, etc. all these systems are either not applicable for continuous transfer, only good for heat-compatible materials like glass, or do not guarantee a 6 log spore reduction. E-Beam opens new perspectives in this field. With E-beam technology it is possible to transfer heat-sensitive (plastic), pre-sterilised materials at high speed, continuously into an aseptic area. E-Beam unifies three different technologies, that result in a very efficient and high-speed decontamination machine designed for the pharmaceutical industry. First, there is the electron beam that decontaminates the goods and an accurate shielding that protects the surrounding from this beam. Second, there is the conveyor system that guarantees the output and the correct exposure time underneath the beam. And third, there is the isolator interface to provide correct differential pressure and clean air inside the tunnel as well as the decontamination of the tunnel with H 2 O 2 prior to production. The E-beam is a low-energy electron beam, capable of decontaminating any kind of surface. It penetrates only a few micrometers into the material and therefore does not deform the packaging media. Currently, machines are being built to transfer pre-sterilised syringes, packed in plastic tubs with a Tyvek cover into an aseptic filling isolator with the following data: decontamination efficiency of 10 6 (6 log spore

  4. The software for the CERN LEP beam orbit measurement system

    International Nuclear Information System (INIS)

    Morpurgo, G.

    1992-01-01

    The Beam Orbit Measurement (BOM) system of LEP consists of 504 pickups, distributed all around the accelerator, that are capable of measuring the positions of the two beams. Their activity has to be synchronized, and the data produced by them have to be collected together, for example to form a 'closed orbit measurement' or a 'trajectory measurement'. On the user side, several clients can access simultaneously the results from this instrument. An automatic acquisition mode, and an 'on request' one, can run in parallel. This results in a very flexible and powerful system. The functionality of the BOM system is fully described, as well as the structure of the software processes which constitute the system, and their interconnections. Problems solved during the implementation are emphasized. (author)

  5. Beam profile diagnostics system for SDUV-FEL

    International Nuclear Information System (INIS)

    Xu Yichao; Han Lifeng; Chen Yongzhong

    2010-01-01

    A new beam profile diagnostics system for Shanghai Deep Ultraviolet Free Electron Laser (SDUV-FEL) has been developed based on industrial Ethernet, with good versatility and scalability. The system includes three major subsystems for image acquisition,pneumatic control and stepper motor control, respectively. Virtual instrument technology is adopted to drive the devices, and to develop the measurement software. In this paper,we describe the system structure, and its hardware and software design. The results of system commissioning are given as well. As an important diagnostic tool and data acquisition method, the system has been successfully applied to the measurement and control of the SDUV-FEL.(authors)

  6. Design of Database System of HIRFL-CSR Beam Line

    International Nuclear Information System (INIS)

    Li Peng; Li Ke; Yin Dayu; Yuan Youjin; Gou Shizhe

    2009-01-01

    This paper introduces the database design and optimization for the power supply system of Lanzhou Heavy Ion Accelerator CSR (HIRFL-CSR) beam line. Based on HIFEL-CSR main Oracle database system, the interface was designed to read parameters of the power supply while achieving real-time monitoring. A new database system to store the history data of power supplies was established at the same time, and it realized the data exchange between Oracle database system and Access database system. Meanwhile, the interface was designed conveniently for printing and query parameters. (authors)

  7. Optical two-beam traps in microfluidic systems

    DEFF Research Database (Denmark)

    Berg-Sørensen, Kirstine

    2016-01-01

    An attractive solution for optical trapping and stretching by means of two counterpropagating laser beams is to embed waveguides or optical fibers in a microfluidic system. The microfluidic system can be constructed in different materials, ranging from soft polymers that may easily be cast...... written waveguides and in an injection molded polymer chip with grooves for optical fibers. (C) 2016 The Japan Society of Applied Physics....

  8. Mathematical model of vertical mass transport in the mine dumps Western Donbass

    Directory of Open Access Journals (Sweden)

    Yevhrashkina T.P.

    2012-09-01

    Full Text Available The multivariate mathematical models of the recultivated, recultivated and dumping with dry system, recultivated in systematically irrigation conditions and free of overgrowth by wild plants are proposed, designed and quantified. The theory of physico-chemical hydrodynamics of pore space using analytical and numerical methods for solving the equations of motion and mass conservation of matter all models are based on. The adequacy of built models and man-maid processes that proceed inside the mine dumps is proved.

  9. Beam position feedback system for the advanced photon source

    International Nuclear Information System (INIS)

    Chung, Y.

    1994-01-01

    The Advanced Photon Source (APS) will implement both global and local beam position feedback systems to stabilize the particle and x-ray beams for the storage ring. The systems consist of 20 VME crates distributed around the ring, each running multiple digital signal processors (DSP) running at 4 kHz sampling rate with a proportional, integral, and derivative (PID) control algorithm. The particle and x-ray beam position data is shared by the distributed processors through networked reflective memory. A theory of closed orbit correction using the technique of singular value decomposition (SVD) of the response matrix and simulation of its application to the APS storage ring will be discussed. This technique combines the global and local feedback systems and resolves the conflict among multiple local feedback systems due to local bump closure error. Maximum correction efficiency is achieved by feeding back to the global orbit data to the local feedback systems. The effect of the eddy current induced in the relatively thick (1/2 in.) vacuum chamber by the ac corrector magnet field for local feedback systems is compensated by digital filters. Results of experiments conducted on the x-ray ring of the National Synchrotron Light Source and the SPEAR at Stanford Synchrotron Radiation Laboratory will also be presented

  10. Beam position feedback system for the advanced photon source

    International Nuclear Information System (INIS)

    Chung, Y.

    1994-01-01

    The Advanced Photon Source (APS) will implement both global and local beam position feedback systems to stabilize the particle and X-ray beams for the storage ring. The systems consist of 20 VME crates distributed around the ring, each running multiple digital signal processors (DSP) running at 4 kHz sampling rate with a proportional, integral, and derivative (PID) control algorithm. The particle and X-ray beam position data is shared by the distributed processors through networked reflective memory. A theory of closed orbit correction using the technique of singular value decomposition (SVD) of the response matrix and simulation of its application to the APS storage ring will be discussed. This technique combines the global and local feedback systems and resolves the conflict among multiple local feedback systems due to local bump closure error. Maximum correction efficiency is achieved by feeding back the global orbit data to the local feedback systems. The effect of the vacuum chamber eddy current induced by the AC corrector magnet field for local feedback systems is compensated by digital filters. Results of experiments conducted on the X-ray ring of the National Synchrotron Light Source and the SPEAR at Stanford Synchrotron Radiation Laboratory will be presented. copyright 1994 American Institute of Physics

  11. Beam position feedback system for the Advanced Photon Source

    International Nuclear Information System (INIS)

    Chung, Y.

    1993-01-01

    The Advanced Photon Source (APS) will implement both global and local beam position feedback systems to stabilize the particle and X-ray beams for the storage ring. The systems consist of 20 VME crates distributed around the ring, each running multiple digital signal processors (DSP) running at 4kHz sampling rate with a proportional, integral, and derivative (PID) control algorithm. The particle and X-ray beam position data is shared by the distributed processors through networked reflective memory. A theory of closed orbit correction using the technique of singular value decomposition (SVD) of the response matrix and simulation of its application to the APS storage ring will be discussed. This technique combines the global and local feedback systems and resolves the conflict among multiple local feedback systems due to local bump closure error. Maximum correction efficiency is achieved by feeding back the global orbit data to the local feedback systems. The effect of the vacuum chamber eddy current induced by the AC corrector magnet field for local feedback systems is compensated by digital filters. Results of experiments conducted on the X-ray ring of the National Synchrotron Light Source and the SPEAR at Stanford Synchrotron Radiation Laboratory will be presented

  12. Beam position feedback system for the Advanced Photon Source

    International Nuclear Information System (INIS)

    Chung, Y.

    1993-01-01

    The Advanced Photon Source (APS) will implement both global and local beam position feedback systems to stabilize the particle and X-ray beams for the storage ring. The systems consist of 20 VME crates distributed around the ring, each running multiple digital signal processors (DSP) running at 4kHz sampling rate with a proportional, integral, and derivative (PID) control algorithm. The particle and X-ray beam position data is shared by the distributed processors through networked reflective memory. A theory of closed orbit correction using the technique of singular value decomposition (SVD) of the response matrix and simulation of its application to the APS storage ring will be discussed. This technique combines the global and local feedback systems and resolves the conflict among multiple local feedback systems due to local bump closure error. Maximum correction efficiency is achieved by feeding back the global orbit data to the local feedback systems. The effect of the eddy current induced in the relatively thick (1/2 inch) vacuum chamber by the AC corrector magnet field for local feedback systems is compensated by digital filters. Results of experiments conducted on the X-ray ring of the National Synchrotron Light Source and the SPEAR at Stanford Synchrotron Radiation Laboratory will also be presented

  13. Electron beam extraction system with a ring radiation field

    International Nuclear Information System (INIS)

    Auslender, V.L.; Kuksanov, N.K.; Polyakov, V.A.; Salimov, R.A.; Chertok, I.L.

    1979-01-01

    Description and results of testings of two electron beam extraction systems for shaping of a circular irradiation field are given. One of the systems contains three 20 cm long outlet windows arranged at 120 deg angle with respect to each other. Tests at the ILU-6 accelerator have shown that the given system provides 150 mm zone irradiation from three sides. Beam utilization factor when irradiating three 40 mm dia tubes amounted to 35% which provides capacity of 2.5 txMrad/h at 20 kW beam power. The other extraction system includes two C-form magnets producing nonuniform and opposing magnetic fields. This system tests at the EhLV-2 accelerator have shown that at 0.8-1.5 MeV electron energy it is possible to irradiate of 60 and 100 mm dia objects, accordingly. The system may be used together with both constant-action and pulse-action accelerators having extraction with linear scanning [ru

  14. Advanced Lyapunov control of a novel laser beam tracking system

    Science.gov (United States)

    Nikulin, Vladimir V.; Sofka, Jozef; Skormin, Victor A.

    2005-05-01

    Laser communication systems developed for mobile platforms, such as satellites, aircraft, and terrain vehicles, require fast wide-range beam-steering devices to establish and maintain a communication link. Conventionally, the low-bandwidth, high-steering-range part of the beam-positioning task is performed by gimbals that inherently constitutes the system bottleneck in terms of reliability, accuracy and dynamic performance. Omni-WristTM, a novel robotic sensor mount capable of carrying a payload of 5 lb and providing a full 180-deg hemisphere of azimuth/declination motion is known to be free of most of the deficiencies of gimbals. Provided with appropriate controls, it has the potential to become a new generation of gimbals systems. The approach we demonstrate describes an adaptive controller enabling Omni-WristTM to be utilized as a part of a laser beam positioning system. It is based on a Lyapunov function that ensures global asymptotic stability of the entire system while achieving high tracking accuracy. The proposed scheme is highly robust, does not require knowledge of complex system dynamics, and facilitates independent control of each channel by full decoupling of the Omni-WristTM dynamics. We summarize the basic algorithm and demonstrate the results obtained in the simulation environment.

  15. Interference-aware random beam selection for spectrum sharing systems

    KAUST Repository

    Abdallah, Mohamed M.

    2012-09-01

    Spectrum sharing systems have been introduced to alleviate the problem of spectrum scarcity by allowing secondary unlicensed networks to share the spectrum with primary licensed networks under acceptable interference levels to the primary users. In this paper, we develop interference-aware random beam selection schemes that provide enhanced throughput for the secondary link under the condition that the interference observed at the primary link is within a predetermined acceptable value. For a secondary transmitter equipped with multiple antennas, our schemes select a random beam, among a set of power- optimized orthogonal random beams, that maximizes the capacity of the secondary link while satisfying the interference constraint at the primary receiver for different levels of feedback information describing the interference level at the primary receiver. For the proposed schemes, we develop a statistical analysis for the signal-to-noise and interference ratio (SINR) statistics as well as the capacity of the secondary link. Finally, we present numerical results that study the effect of system parameters including number of beams and the maximum transmission power on the capacity of the secondary link attained using the proposed schemes. © 2012 IEEE.

  16. Design, fabrication and operation of the mechanical systems for the Neutral Beam Engineering Test Facility

    International Nuclear Information System (INIS)

    Paterson, J.A.; Biagi, L.A.; Fong, M.; Koehler, G.W.; Low, W.; Purgalis, P.; Wells, R.P.

    1983-12-01

    The Neutral Beam Engineering Test Facility (NBETF) at Lawrence Berkeley Laboratory (LBL) is a National Test Facility used to develop long pulse Neutral Beam Sources. The Facility will test sources up to 120 keV, 50 A, with 30 s beam-on times with a 10% duty factor. For this application, an actively cooled beam dump is required and one has been constructed capable of dissipating a wide range of power density profiles. The flexibility of the design is achieved by utilizing a standard modular panel design which is incorporated into a moveable support structure comprised of eight separately controllable manipulator assemblies. A unique neutralizer design has been installed into the NBETF beamline. This is a gun-drilled moveable brazed assembly which provides continuous armoring of the beamline near the source. The unit penetrates the source mounting valve during operation and retracts to permit the valve to close as needed. The beamline is also equpped with many beam scraper plates of differing detail design and dissipation capabilities

  17. Development of an energy analyzer as diagnostic of beam-generated plasma in negative ion beam systems

    Science.gov (United States)

    Sartori, E.; Carozzi, G.; Veltri, P.; Spolaore, M.; Cavazzana, R.; Antoni, V.; Serianni, G.

    2017-08-01

    The measurement of the plasma potential and the energy spectrum of secondary particles in the drift region of a negative ion beam offers an insight into beam-induced plasma formation and beam transport in low pressure gasses. Plasma formation in negative-ion beam systems, and the characteristics of such a plasma are of interest especially for space charge compensation, plasma formation in neutralizers, and the development of improved schemes of beam-induced plasma neutralisers for future fusion devices. All these aspects have direct implications in the ITER Heating Neutral Beam and the operation of the prototypes, SPIDER and MITICA, and also have important role in the conceptual studies for NBI systems of DEMO, while at present experimental data are lacking. In this paper we present the design and development of an ion energy analyzer to measure the beam plasma formation and space charge compensation in negative ion beams. The diagnostic is a retarding field energy analyzer (RFEA), and will measure the transverse energy spectra of plasma molecular ions. The calculations that supported the design are reported, and a method to interpret the measurements in negative ion beam systems is also proposed. Finally, the experimental results of the first test in a magnetron plasma are presented.

  18. DC proton beam measurements in a single-solenoid low-energy beam transport system

    International Nuclear Information System (INIS)

    Stevens, R.R. Jr.; Schafstall, P.; Schneider, J.D.; Sherman, J.; Zaugg, T.; Taylor, T.

    1994-01-01

    High current, CW proton accelerators are being considered for a number of applications including disposition of nuclear wastes, reduction of fissionable nuclear material inventories, safe production of critical nuclear materials, and energy production. All these applications require the development of high current, reliable, hydrogen ion injectors. In 1986, a program using CW RFQ technology was undertaken at CRL in collaboration with LANL and was continued there until 1993. During this time, an accelerator was built which produced 600 keV, 75 mA and 1,250 keV, 55 mA CW proton beams. The present program at Los Alamos using this accelerator is aimed at continuing the CRL work to demonstrate long-term reliability. In the present work, the authors are seeking to determine the optimal match to and the current limit of the 1,250-keV RFQ. This paper discusses the characterization of the 50 keV beams at the exit of the single-solenoid LEBT and presents both the experimental measurements and the beam simulations done to model this system

  19. Beam profile monitor system for the bevalac transfer line

    International Nuclear Information System (INIS)

    Stover, G.

    1985-01-01

    Incorporated in the current Bevalac transfer line upgrade project is a proposal for a new electronic beam monitoring system. It will be designed to amplify, convert, and transmit the signals of twelve 16 by 16 multi-wire grids to a central computer located in the Bevatron control room. Each station will contain interface amplifiers and a local microprocessor to convert wire grid currents into digitized values which will then be transmitted via a serial data channel to the main computer. The system will have a large dynamic range (1 nano to 1 milli-ampere of beam current), be designed for distributed operation, and will be easily expandable. This paper describes the basic electronic hardware and software components of the proposed system

  20. The Final Focus Test Beam laser referene system

    International Nuclear Information System (INIS)

    Bressler, V.E.; Ruland, R.E.

    1993-05-01

    The original design for the SLAC linac included an alignment reference system with 270 diffraction gratings situated along the 3000 meter linac. These gratings have provided SLAC with a global reference line repeatable to within 200 micro meters. For the Final Focus Test Beam, this laser system has been extended and 13 new diffraction gratings have been installed. Improvements targets and the availability of new instruments allows us to evaluate the performance of the laser reference system at the 510 micro meter level. An explanation of the system and the results of our evaluation are presented

  1. Hydrological investigations on an overburden dump in the Borken brown coal district, North Hessen

    International Nuclear Information System (INIS)

    Wolff, P.; Latif, A.

    1992-01-01

    After a general hydrological investigation of the Dosenberg overburden dump in North Hessen, a climatic water balance is established for the main vegetation periods of the years 1989, 1990, and 1991. This is followed by a description of the investigations of water levels of the plateau pools and time curves of water levels of observation holes drilled into the dump plateau. In all, the findings suggest that in the period under investigation, which comprised three draught years in sequence, the dump was largely an independent hydrological system. In this period, no significant discharge of water from the 'Dosenberg ecosystem' into the surrounding area occurred, i.e. the overburden dumps had no effect on the surrounding cultivated land and bodies of water. This may be different in wet years. On the other hand, the prevailing climate conditions give cause to assume that no negative effects need be expected. The investigation will be continued. (orig.) [de

  2. Emittance measuring unit for 100% duty factor linac injector beams

    Energy Technology Data Exchange (ETDEWEB)

    Shubaly, M R; Pachner, J Jr; Ormrod, J H; Ungrin, J; Schriber, S O [ed.

    1976-11-01

    A description is given of a system to measure the emittance of a 750 keV 100 mA dc proton beam suitable for injection into a 100% duty factor linear accelerator. A relatively slowly pulsed 45/sup 0/ magnet switches the beam to a beam dump inside the emittance measuring unit for approx. 10 s. A fast pulsed 5/sup 0/ magnet then deflects the beam to a multiple aperture ''pepper-pot'' plate for 300 ..mu..s. Beamlets passing through the plate travel 520 mm and produce a pattern on a scintillator screen. A photograph of the pattern is analyzed to determine beam emittance. Preliminary results on low current beams show a gross increase in the emittance in the horizontal plane.

  3. Particle beam digital phase control system for COSY

    International Nuclear Information System (INIS)

    Schnase, A.

    1994-02-01

    Particle accelerators require that the orbit of the charged particles in the vacuum chamber is controlled to fulfil narrow limits. This is done by magnetic deflection systems and exactly adjusted rf-acceleration. Up to now the necessary control-functions were realised with analogue parts. This work describes a digital phase control system that works in real time and is used with the proton accelerator COSY. The physical design of the accelerator sets the accuracy-specifications of the revolution frequency (<1 Hz in the whole range from 400 kHz to 1.6 MHz), the phase-difference (<0.01 ), the signal-to-noise-ratio (<-60 dBc) and the update rate (<1 μs) of the parameters. In a typical operation the beam is first bunched and synchronised to the reference oscillator. After that the beam influences the rf-system with the help of charge detectors and now the rf-systems will be synchronised with the bunched beam. This control-loop is modelled and simulated with PSPICE. (orig.)

  4. Microcontroller based two axis microtron beam extraction system

    International Nuclear Information System (INIS)

    Ashoka, H.; Jathar, M.; Meshram, V.; Rao, Nageswara

    2009-01-01

    Microtron is an electron accelerator which is used to accelerate the electron beam. The Microtron consists of electro magnet with two poles separated by yoke for completion of path for magnetic flux lines. A compact Microtron capable of accelerating electrons up to 12 MeV has been developed in RRCAT. The beam from the Microtron has to be extracted from various orbits depending upon the user requirement (X-Y stage is built with an accuracy of 100 μm). This paper describes the design and development of microcontroller based two axis beam extraction system for Microtron, with a resolution of 50 μm to position the extraction tube with respect to selected orbit. Two axis motion controller is developed using current controlled micro-stepping driver mechanism, which uses Bipolar Chopper Drive for driving stepper motors. Each phase has 2A continuous driving capability. The system is provided with user selectable controls like speed, steps, direction, and mode. This system is provided with RS-232 interface, to accept commands from PC. This system also has local keyboard and LCD interface to use in Stand-alone mode (local Mode). (author)

  5. Beam shaping to provide round and square-shaped beams in optical systems of high-power lasers

    Science.gov (United States)

    Laskin, Alexander; Laskin, Vadim

    2016-05-01

    Optical systems of modern high-power lasers require control of irradiance distribution: round or square-shaped flat-top or super-Gaussian irradiance profiles are optimum for amplification in MOPA lasers and for thermal load management while pumping of crystals of solid-state ultra-short pulse lasers to control heat and minimize its impact on the laser power and beam quality while maximizing overall laser efficiency, variable profiles are also important in irradiating of photocathode of Free Electron lasers (FEL). It is suggested to solve the task of irradiance re-distribution using field mapping refractive beam shapers like piShaper. The operational principle of these devices presumes transformation of laser beam intensity from Gaussian to flat-top one with high flatness of output wavefront, saving of beam consistency, providing collimated output beam of low divergence, high transmittance, extended depth of field, negligible residual wave aberration, and achromatic design provides capability to work with ultra-short pulse lasers having broad spectrum. Using the same piShaper device it is possible to realize beams with flat-top, inverse Gauss or super Gauss irradiance distribution by simple variation of input beam diameter, and the beam shape can be round or square with soft edges. This paper will describe some design basics of refractive beam shapers of the field mapping type and optical layouts of their applying in optical systems of high-power lasers. Examples of real implementations and experimental results will be presented as well.

  6. Pattern data handling system for an electron beam exposure system

    International Nuclear Information System (INIS)

    Berrian, D.W.; Ward, B.W.

    1985-01-01

    A beam is blanked over a rectangular area by storing beam blanking data in a bit map memory having data words of n bits. An address counter is loaded with the x-coordinate of the location of the rectangle and inhibited (by word counter) from counting after advancing through a number of addresses corresponding to the length of the rectangle. Mask bits whose position determines the y-coordinate of the location of the rectangle and whose number determines the width of the rectangle are loaded into a mask latch having n bit locations each with an output coupled to write enable inputs of the memory corresponding to the n bits of the data words in the memory. As the address counter advances through the number of addresses corresponding to the length of the rectangle, data describing the rectangle is stored in the memory without altering masked parts of previously stored blanking data. (author)

  7. Development of BPM/BLM DAQ System for KOMAC Beam Line

    Energy Technology Data Exchange (ETDEWEB)

    Song, Young-Gi; Kim, Jae-Ha; Yun, Sang-Pil; Kim, Han-Sung; Kwon, Hyeok-Jung; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Gyeongju (Korea, Republic of)

    2016-10-15

    The proton beam is accelerated from 3 MeV to 100 MeV through 11 DTL tanks. The KOMAC installed 10 beam lines, 5 for 20-MeV beams and 5 for 100-MeV beams. The proton beam is transmitted to two target room. The KOMAC has been operating two beam lines, one for 20 MeV and one for 100 MeV. New beam line, RI beam line is under commissioning. A Data Acquisition (DAQ) system is essential to monitor beam signals in an analog front-end circuitry from BPM and BLM at beam lines. A data acquisition (DAQ) system is essential to monitor beam signals in an analog front-end circuitry from BPM and BLM at beam lines. The DAQ digitizes beam signal and the sampling is synchronized with a reference signal which is an external trigger for beam operation. The digitized data is accessible by the Experimental Physics and Industrial Control System (EPICS)-based control system, which manages the whole accelerator control. The beam monitoring system integrates BLM and BPM signals into the control system and offers realtime data to operators. The IOC, which is implemented with Linux and a PCI driver, supports data acquisition as a very flexible solution.

  8. Plasma waves in hot relativistic beam-plasma systems: Pt. 1

    International Nuclear Information System (INIS)

    Magneville, A.

    1990-01-01

    Dispersion relations of plasma waves in a beam-plasma system are computed in the general case where the plasma and beam temperatures, and the velocity of the beam, may be relativistic. The two asymptotic temperature cases, and different contributions of plasma or beam particles to wave dispersion are considered. (author)

  9. Current status of electron beam processing system and its applications

    International Nuclear Information System (INIS)

    Taniguchi, S.

    2005-01-01

    The feature and application fields of electron beam processing systems (EPS), the selection of machine ratings and safety measures for EPS are described. EPS has the various features: a) Chemical reactions occurs independent of the temperature, b) it occurs without any added substances such as catalysts, c) mass productivity, d) easy operation, as is exemplified by switch ON and OFF, and e) easy maintenance, compared with radioisotope sources. After briefly explaining acceleration type (DC or AC), power supply (Van-de-Graaf or Cockcroft-walton and others), beam scanning to be used for large area irradiation, and some typical applications (cross-linking, radical polymerization, the paper describes necessary safety measures such as X-ray shielding, ozone control including ozone generation and its disposal, interlock system, warning buzzer, and monitoring and measuring. (S. Ohno)

  10. Beam vacuum system of Brookhaven's muon storage ring

    International Nuclear Information System (INIS)

    Hseuth, H.C.; Snydstrup, L.; Mapes, M.

    1995-01-01

    A storage ring with a circumference of 45 m is being built at Brookhaven to measure the g-2 value of the muons to an accuracy of 0.35 ppm.. The beam vacuum system of the storage ring will operate at 10 -7 Torr and has to be completely non-magnetic. It consists of twelve sector chambers. The chambers are constructed of aluminum and are approximately 3.5 m in length with a rectangular cross-section of 16.5 cm high by 45 cm at the widest point. The design features, fabrication techniques and cleaning methods for these chambers are described. The beam vacuum system will be pumped by forty eight non-magnetic distributed ion pumps with a total pumping speed of over 2000 ell/sec. Monte Carlo simulations of the pressure distribution in the muon storage region are presented

  11. Monitoring the extracted proton beam at the SPS

    CERN Multimedia

    CERN PhotoLab

    1977-01-01

    Fluorescent screens in front of the target positions allow a precise adjustement in front of them. A similar photo was recorded at the beam dump at the beam injection into the SPS, see Weekly Bulletin of April 1976.

  12. Conceptual design for the ZEPHYR neutral-beam injection system

    International Nuclear Information System (INIS)

    Cooper, W.S.; Elischer, V.P.; Goldberg, D.A.; Hopkins, D.B.; Jacobson, V.L.; Lou, K.H.; Tanabe, J.T.

    1981-03-01

    In June 1980, the Lawrence Berkeley Laboratory began a conceptual design study for a neutral beam injection system for the ZEPHYR ignition tokamak proposed by the Max-Planck-Institut fur Plasmaphysik in Garching, Germany. The ZEPHYR project was cancelled, and the LBL design effort concluded prematurely in January 1981. This report describes the conceptual design as it existed at that time, and gives brief consideration to a schedule, but does not deal with costs

  13. PS BOOSTER BEAM TESTS OF THE NEW DIGITAL BEAM CONTROL SYSTEM FOR LEIR

    CERN Document Server

    Angoletta, Maria Elena; Bento, J; De Long, J H; Findlay, A; Matuszkiewicz, P; Pedersen, F; Salom-Sarasqueta, A; CERN. Geneva. AB Department

    2005-01-01

    We have been developing a scaled-down prototype of the new digital beam control and cavity servoing system for CERN’s Low Energy Ion Ring (LEIR) slated for commissioning in 2005. The system’s hardware and software, developed as part of a CERN-BNL collaboration, are based on new all-digital technology already deployed at BNL's AGS Booster. The system relies on VME modules, carrying Digital Signal Processors (DSPs) as well as Field Programmable Gate Arrays (FPGAs), and daughter cards. New concepts deployed include software implementation, through DSPs & FPGAs, of functions traditionally executed by analogue hardware, such as reference-functions and timings generation. Additionally, a user-selectable digital data acquisition functionality provides diagnostic and troubleshoot access points, a new feature which is very useful in a digital system. The scaled-down prototype implements frequency program, radial steering, phase and radial loops capabilities and it has been tested in CERN's PS Booster (PSB) dur...

  14. The system of RF beam control for electron gun

    International Nuclear Information System (INIS)

    Barnyakov, A.M.; Levichev, A.E.; Chernousov, Yu.D.; Ivannikov, V.I.; Shebolaev, I.V.

    2015-01-01

    The system of RF control of three-electrode electron gun current is described. It consists of a source of microwave signal, coaxial line, coaxial RF switch and RF antenna lead. The system allows one to get the electron beam in the form of bunches with the frequency of the accelerating section to achieve the capture of particles in the acceleration mode close to 100%. The results of calculation and analysis of the elements of the system are presented. Characteristics of the devices are obtained experimentally. The results of using RF control in three-electrode electron gun at electron linear accelerator are described

  15. Beam diagnostic system for SSC on HIRFL central console

    International Nuclear Information System (INIS)

    Zhang Guixu; Wang Zhen; Huang Tuanhua

    1998-01-01

    The SSC ion beam diagnostic system on the console of HIRFL in institute of modern physics is presented. The information between console and diagnostic system can be transferred via DECnet communication. The central computer for HIRFL console is VAX-8350, the working computer of diagnostic system is changed from IBM PC/XT to COMPAQ 486, and the operating program is rewritten from FORTRAN to C. In order to communicate information, DECnet TTT function is put into both programs on the VAX and PC

  16. Summary and presentation of the international workshop on beam induced energy deposition (issues, concerns, solutions)

    International Nuclear Information System (INIS)

    Soundranayagam, R.

    1991-11-01

    This report discusses: energy deposition and radiation shielding in antriproton source at FNAL; radiation issues/problems at RHIC; radiation damage to polymers; radiation effects on optical fibre in the SSC tunnel; capabilities of the Brookhaven Radiation Effects Facility; the SSC interaction region; the FLUKA code system, modifications, recent extension and experimental verification; energy particle transport calculations and comparisons with experimental data; Los Alamos High Energy Transport code system; MCNP features and applications; intercomparison of Monte Carlo codes designed for simulation of high energy hadronic cascades; event generator, DTUJET-90 and DTUNUC; Preliminary hydrodynamic calculations of beam energy deposition; MESA code calculations of material response to explosive energy deposition; Smooth particle hydrodynamic; hydrodynamic effects and mass depletion phenomena in targets; beam dump: Beam sweeping and spoilers; Design considerations to mitigate effects of accidental beam dump; SSC beam abort and absorbed; beam abort system of SSC options; unconventional scheme for beam spoilers; low β quadrupoles: Energy deposition and radioactivation; beam induces energy deposition in the SSC components; extension of SSC-SR-1033 approach to radioactivation in LHC and SSC detectors; energy deposition in the SSC low-β IR-quads; beam losses and collimation in the LHC; and radiation shielding around scrapers

  17. The beam synchronous timing system for the LEP instrumentation

    International Nuclear Information System (INIS)

    Baribaud, G.; Brahy, D.; Cojan, A.; Momal, F.; Rabany, M.; Saban, R.; Wolles, J.C.

    1990-01-01

    The beam instrumentation group of LEP has constructed a number of detectors distributed around the collider: these instruments are interfaced to approximately 100 VME-based computers which acquire and process data autonomously. In order to ensure the coherence of a measurement and to correlate measurements of different instruments, it is essential that the data are acquired at the same moment on all the systems. The beam synchronous timing system ensures this by broadcasting messages that describe to all instruments the action to be performed. The instructions are guaranteed to arrive at exactly the same moment to all stations around the 27 km circumference by careful compensation of the delay for each station. The heart of the system is a commercial 25 MHz 68020-based VME module coupled to an in-house designed message assembler: these are able to synthesize instructions for up to six different kinds of instruments in a single LEP revolution (89 μs). Each listening station provides the hardware with pulses derived from the incoming message, filters the messages according to the addresses and passes them to real-time tasks which set the hardware or acquire the data. A reverse channel, peripheral station to the control room, allows up to eight different signals to inform the master of locally detected events such as beam loss or high background. Special recovery instructions can then be broadcast. (orig.)

  18. Properties of waves in an ion-beam plasma system

    International Nuclear Information System (INIS)

    Zank, G.P.; McKenzie, J.F.

    1988-01-01

    A multi-fluid approach is used to describe electrostatic interactions in an ion-beam plasma system. The structure of the wave equation governing the system exhibits the anisotropic and dispersive nature of the waves, whose properties are analysed in terms of the dispersion relation. The main purpose is to classify the different waves that can arise in an ion-beam plasma system in a systematic fashion. The classification is facilitated by introducing a three-parameter CMA diagram that illustrates the topological changes in not only the wavenumber, or refractive-index, surface but also the ray-velocity surface. Furthermore, an analytic expression governing wave amplification in an ion beam plasma is incorporated within the framework of a generalized CMA diagram. Such a description provides a simple interpretation for the onset of wave amplification in terms of a topological change in the refractive-index surface. It is hoped that by collating the wave properties in a unified form, many of the complicated wave features observed in an experiment may be interpreted more easily. (author)

  19. The LCLS Undulator Beam Loss Monitor Readout System

    Energy Technology Data Exchange (ETDEWEB)

    Dusatko, John; Browne, M.; Fisher, A.S.; Kotturi, D.; Norum, S.; Olsen, J.; /SLAC

    2012-07-23

    The LCLS Undulator Beam Loss Monitor System is required to detect any loss radiation seen by the FEL undulators. The undulator segments consist of permanent magnets which are very sensitive to radiation damage. The operational goal is to keep demagnetization below 0.01% over the life of the LCLS. The BLM system is designed to help achieve this goal by detecting any loss radiation and indicating a fault condition if the radiation level exceeds a certain threshold. Upon reception of this fault signal, the LCLS Machine Protection System takes appropriate action by either halting or rate limiting the beam. The BLM detector consists of a PMT coupled to a Cherenkov radiator located near the upstream end of each undulator segment. There are 33 BLMs in the system, one per segment. The detectors are read out by a dedicated system that is integrated directly into the LCLS MPS. The BLM readout system provides monitoring of radiation levels, computation of integrated doses, detection of radiation excursions beyond set thresholds, fault reporting and control of BLM system functions. This paper describes the design, construction and operational performance of the BLM readout system.

  20. Design of the ITER Neutral Beam injectors

    International Nuclear Information System (INIS)

    Hemsworth, R.S.; Feist, J.; Hanada, M.; Heinemann, B.; Inoue, T.; Kuessel, E.; Kulygin, V.; Krylov, A.; Lotte, P.; Miyamoto, K.; Miyamoto, N.; Murdoch, D.; Nagase, A.; Ohara, Y.; Okumura, Y.; Pamela, J.; Panasenkov, A.; Shibata, K.; Tanii, M.

    1996-01-01

    This paper describes the Neutral Beam Injection system which is presently being designed in Europe, Japan and Russia, with co-ordination by the Joint Central Team of ITER at Naka, Japan. The proposed system consists of three negative ion based neutral injectors, delivering a total of 50 MW of 1 MeV D 0 to the ITER plasma for pulse length of ≥1000 s. The injectors each use a single caesiated volume arc discharge negative ion source, and a multi-grid, multi-aperture accelerator, to produce about 40 A of 1 MeV D - . This will be neutralized in a sub-divided gas neutralizer, which has a conversion efficiency of about 60%. The charged fraction of the beam emerging from the neutralizer is dumped in an electrostatic residual ion dump. A water cooled calorimeter can be moved into the beam path to intercept the neutral beam, allowing commissioning of the injector independent of ITER. copyright 1996 American Institute of Physics