WorldWideScience

Sample records for basin project management

  1. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Science.gov (United States)

    2011-04-05

    ... Bureau of Reclamation Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement... Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project. The Washington State...; and (4) identify a comprehensive approach for efficient management of basin water supplies....

  2. Collaboration in River Basin Management: The Great Rivers Project

    Science.gov (United States)

    Crowther, S.; Vridhachalam, M.; Tomala-Reyes, A.; Guerra, A.; Chu, H.; Eckman, B.

    2008-12-01

    The health of the world's freshwater ecosystems is fundamental to the health of people, plants and animals around the world. The sustainable use of the world's freshwater resources is recognized as one of the most urgent challenges facing society today. An estimated 1.3 billion people currently lack access to safe drinking water, an issue the United Nations specifically includes in its recently published Millennium Development Goals. IBM is collaborating with The Nature Conservancy and the Center for Sustainability and the Global Environment (SAGE) at the University of Wisconsin, Madison to build a Modeling Collaboration Framework and Decision Support System (DSS) designed to help policy makers and a variety of stakeholders (farmers, fish and wildlife managers, hydropower operators, et al.) to assess, come to consensus, and act on land use decisions representing effective compromises between human use and ecosystem preservation/restoration efforts. Initially focused on Brazil's Paraguay-Parana, China's Yangtze, and the Mississippi Basin in the US, the DSS integrates data and models from a wide variety of environmental sectors, including water balance, water quality, carbon balance, crop production, hydropower, and biodiversity. In this presentation we focus on the collaboration aspects of the DSS. The DSS is an open environment tool that allows scientists, policy makers, politicians, land owners, and anyone who desires to take ownership of their actions in support of the environment to work together to that end. The DSS supports a range of features that empower such a community to collaboratively work together. Supported collaboration mediums include peer reviews, live chat, static comments, and Web 2.0 functionality such as tagging. In addition, we are building a 3-D virtual world component which will allow users to experience and share system results, first-hand. Models and simulation results may be annotated with free-text comments and tags, whether unique or

  3. The Palouse Basin Participatory Model Pilot Project: A Participatory Approach to Bi-state Groundwater Management

    Science.gov (United States)

    Beall, A.; Fiedler, F.; Boll, J.; Cosens, B.; Harris, C.

    2008-12-01

    In March 2008, The University of Idaho Waters of the West, the Palouse Basin Aquifer Committee and its Citizen Advisory Group undertook a pilot project to explore the use of participatory modeling to assist with water resource management decisions. The Palouse basin supplies Moscow, Idaho, Pullman, Washington, and surrounding communities with high quality groundwater. However, water levels in the major aquifer systems have been declining since records have been kept. Solutions are complicated by jurisdictional considerations and limited alternatives for supply. We hope that by using a participatory approach major conflicts will be avoided. Group system dynamics modeling has been used for various environmental concerns such as air quality, biological management, water quality and quantity. These models create a nexus of science, policy, and economic and social concerns, which enhances discussion of issues surrounding the use of natural resources. Models may be developed into educational and or decision support tools which can be used to assist with planning processes. The long-term goal of the Palouse basin project is to develop such a model. The pilot project participants include hydrologists, facility operators, policy makers and local citizens. The model they have developed integrates issues such as scientific uncertainty, groundwater volumes, and potential conservation measures and costs. Preliminary results indicate that participants are satisfied with the approach and are looking to use the model for education and to help direct potential research. We will present the results of the pilot project, including the developed model and insights from the process.

  4. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  6. Fish Habitat Improvement Projects in the Fifteenmile Creek and Trout Creek Basins of Central Oregon: Field Review and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Kauffman, J. Boone

    1993-07-01

    A field review of stream habitat improvement project sites in the lower Deschutes River Basin was conducted by riparian ecology, fisheries, and hydrology specialists. Habitat management objectives, limiting factors, project implementation, land use history, and other factors were discussed at each site. This information, in conjunction with the reviewer`s field inspections of portions of a particular habitat project, provided the basis for this report.

  7. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  8. Mitigation : Closed Basin Project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The upcoming meeting on waterfowl mitigation for the Closed Basin Project will have several people talk about possible changes to the waterfowl mitigation program. A...

  9. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    Science.gov (United States)

    Hanson, R. T.; Lockwood, B.; Schmid, Wolfgang

    2014-11-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within “water-balance subregions” (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori. The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations

  10. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  11. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  12. Project 2010 Project Management

    CERN Document Server

    Happy, Robert

    2010-01-01

    The ideal on-the-job reference guide for project managers who use Microsoft Project 2010. This must-have guide to using Microsoft Project 2010 is written from a real project manager's perspective and is packed with information you can use on the job. The book explores using Project 2010 during phases of project management, reveals best practices, and walks you through project flow from planning through tracking to closure. This valuable book follows the processes defined in the PMBOK Guide, Fourth Edition , and also provides exam prep for Microsoft's MCTS: Project 2010 certification.: Explains

  13. U.S. Geological Survey and Bureau of Land Management Cooperative Coalbed Methane Project in the Powder River Basin, Wyoming

    Science.gov (United States)

    ,

    2006-01-01

    Introduction: Evidence that earthquakes threaten the Mississippi, Ohio, and Wabash River valleys of the Central United States abounds. In fact, several of the largest historical earthquakes to strike the continental United States occurred in the winter of 1811-1812 along the New Madrid seismic zone, which stretches from just west of Memphis, Tenn., into southern Illinois (fig. 1). Several times in the past century, moderate earthquakes have been widely felt in the Wabash Valley seismic zone along the southern border of Illinois and Indiana (fig. 1). Throughout the region, between 150 and 200 earthquakes are recorded annually by a network of monitoring instruments, although most are too small to be felt by people. Geologic evidence for prehistoric earthquakes throughout the region has been mounting since the late 1970s. But how significant is the threat? How likely are large earthquakes and, more importantly, what is the chance that the shaking they cause will be damaging?The Bureau of Land Management (BLM) Wyoming Reservoir Management Group and the U.S. Geological Survey (USGS) began a cooperative project in 1999 to collect technical and analytical data on coalbed methane (CBM) resources and quality of the water produced from coalbeds in the Wyoming part of the Powder River Basin. The agencies have complementary but divergent goals and these kinds of data are essential to accomplish their respective resource evaluation and management tasks. The project also addresses the general public need for information pertaining to Powder River Basin CBM resources and development. BLM needs, which relate primarily to the management of CBM resources, include improved gas content and gas in-place estimates for reservoir characterization and resource/reserve assessment, evaluation, and utilization. USGS goals include a basinwide assessment of CBM resources, an improved understanding of the nature and origin of coalbed gases and formation waters, and the development of predictive

  14. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  15. 78 FR 69363 - Lake Tahoe Basin Management Unit, California, Heavenly Mountain Resort Epic Discovery Project

    Science.gov (United States)

    2013-11-19

    ... East Peak Lodge. It will allow visitors the opportunity to hike back and forth between the two activity... observation tower near the existing Ridge Run Overlook. It will resemble a historic Forest Service Fire... and modern role in managing the forests, including fire. The tower will be approximately...

  16. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    Science.gov (United States)

    Hanson, Randall T.; Lockwood, Brian; Schmid, Wolfgang

    2014-01-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within “water-balance subregions” (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori.

  17. THE ADVANCED CHEMISTRY BASINS PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    William Goddard; Peter Meulbroek; Yongchun Tang; Lawrence Cathles III

    2004-04-05

    In the next decades, oil exploration by majors and independents will increasingly be in remote, inaccessible areas, or in areas where there has been extensive shallow exploration but deeper exploration potential may remain; areas where the collection of data is expensive, difficult, or even impossible, and where the most efficient use of existing data can drive the economics of the target. The ability to read hydrocarbon chemistry in terms of subsurface migration processes by relating it to the evolution of the basin and fluid migration is perhaps the single technological capability that could most improve our ability to explore effectively because it would allow us to use a vast store of existing or easily collected chemical data to determine the major migration pathways in a basin and to determine if there is deep exploration potential. To this end a the DOE funded a joint effort between California Institute of Technology, Cornell University, and GeoGroup Inc. to assemble a representative set of maturity and maturation kinetic models and develop an advanced basin model able to predict the chemistry of hydrocarbons in a basin from this input data. The four year project is now completed and has produced set of public domain maturity indicator and maturation kinetic data set, an oil chemistry and flash calculation tool operable under Excel, and a user friendly, graphically intuitive basin model that uses this data and flash tool, operates on a PC, and simulates hydrocarbon generation and migration and the chemical changes that can occur during migration (such as phase separation and gas washing). The DOE Advanced Chemistry Basin Model includes a number of new methods that represent advances over current technology. The model is built around the concept of handling arbitrarily detailed chemical composition of fluids in a robust finite-element 2-D grid. There are three themes on which the model focuses: chemical kinetic and equilibrium reaction parameters, chemical

  18. A Proposal of Branding Water - Based Recreational Activities Within The Destination Management Project in The Dalaman Basin, Muğla, Turkey

    Directory of Open Access Journals (Sweden)

    Ali TÜRKER

    2014-08-01

    Full Text Available "Arrival place" (TDK, 2012 or "a place that has different natural features or attractions where visitors are interested in visiting" (Coltman, 1989: 48 were defined as destination. Nowadays this is one of the topics that attention is paid to in tourism literature. However, destination is drawn in a reg ional boundaries rather than political boundaries where tourist resources in a geographic area are clustered. This in turn necessitates the different local government units and non - governmental organizations (NGOs in acting management and marketing togeth er. Dalaman basin boundaries cover Dalaman, Ortaca and Koycegiz municipalities in the province of Mugla. Dalaman international airport is located in the area that tourists have an easy access to reach accommodation establishments soon after they land and t ourists further benefit from the region's historical and touristic values. This study has primarily presented the findings regarding Dalaman Basin Destination Management Project involving these three municipalities, the tourism business representatives, NG Os and Mugla Sıtkı Kocman University lecturers. Through this consecutive meetings among these parties involved, a main conclusion has drawn upon water - based recreational activities should be focused and these activities should be used in marketing the regi on. Further to this conclusion, these water - based activities should be branded. Within this destination management project, "Turkish Water Land" was proposed as a brand name to describe the region‟s water - based activities. The three local authorities of th e Dalaman basin unanimously agreed upon a protocol stating the roles and allocation of investments and expenditures required. Water based recreation activities are located in the region as follows: Dalaman river, Koycegiz lake, Iztuzu and Sarigerme beaches , Ekin and Sarsala bays and Dalyan canal.

  19. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  20. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  1. Making climate change projections relevant to water management: opportunities and challenges in the Colorado River basin (Invited)

    Science.gov (United States)

    Vano, J. A.

    2013-12-01

    By 2007, motivated by the ongoing drought and release of new climate model projections associated with the IPCC AR4 report, multiple independent studies had made estimates of future Colorado River streamflow. Each study had a unique approach, and unique estimate for the magnitude for mid-21st century streamflow change ranging from declines of only 6% to declines of as much as 45%. The differences among studies provided for interesting scientific debates, but to many practitioners this appeared to be just a tangle of conflicting predictions, leading to the question 'why is there such a wide range of projections of impacts of future climate change on Colorado River streamflow, and how should this uncertainty be interpreted?' In response, a group of scientists from academic and federal agencies, brought together through a NOAA cross-RISA project, set forth to identify the major sources of disparities and provide actionable science and guidance for water managers and decision makers. Through this project, four major sources of disparities among modeling studies were identified that arise from both methodological and model differences. These differences, in order of importance, are: (1) the Global Climate Models (GCMs) and emission scenarios used; (2) the ability of land surface hydrology and atmospheric models to simulate properly the high elevation runoff source areas; (3) the sensitivities of land surface hydrology models to precipitation and temperature changes; and (4) the methods used to statistically downscale GCM scenarios. Additionally, reconstructions of pre-instrumental streamflows provided further insights about the greatest risk to Colorado River streamflow of a multi-decadal drought, like those observed in paleo reconstructions, exacerbated by a steady reduction in flows due to climate change. Within this talk I will provide an overview of these findings and insights into the opportunities and challenges encountered in the process of striving to make

  2. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) Project A.9

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, J.W.

    2000-05-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment.

  3. Yakima Basin Fish Passage Project, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs.

  4. Modern project-management

    CERN Document Server

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  5. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  6. Project Risk Management Phases

    OpenAIRE

    Claudiu-George BOCEAN

    2008-01-01

    Risk management is the human activity which integrates recognition of risk, risk assessment, developing strategies to manage it, and mitigation of risk using managerial resources. Notwithstanding the domain of activities where they are conducted, projects often entail risks, and risk management has been widely recognized as a success factor in project management. Following a concept clarification on project risk management, this paper presents a generic list steps in the risk management proce...

  7. Ecological River Basin Management.

    Science.gov (United States)

    Smith, Anthony Wayne

    Addressing the Seventh American Water Resources Conference, Washington, D. C., October, 1971, Anthony Wayne Smith, President, National Parks and Conservation Association, presents an expose on how rivers should be managed by methods which restores and preserve the natural life balances of the localities and regions through which they flow. The…

  8. Project Portfolio Management Software

    OpenAIRE

    Paul POCATILU

    2006-01-01

    In order to design a methodology for the development of project portfolio management (PPM) applications, the existing applications have to be studied. This paper describes the main characteristics of the leading project portfolio management software applications.

  9. Project Portfolio Management Software

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available In order to design a methodology for the development of project portfolio management (PPM applications, the existing applications have to be studied. This paper describes the main characteristics of the leading project portfolio management software applications.

  10. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  11. Web Project Management

    OpenAIRE

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  12. Information systems project management

    CERN Document Server

    Olson, David

    2014-01-01

    Information Systems Project Management addresses project management in the context of information systems. It deals with general project management principles, with focus on the special characteristics of information systems. It is based on an earlier text, but shortened to focus on essential project management elements.This updated version presents various statistics indicating endemic problems in completing information system projects on time, within budget, at designed functionality. While successful completion of an information systems project is a challenge, there are some things that ca

  13. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  14. Initial Provincial Water Rights Dynamic Projection Pursuit Allocation Based on the Most Stringent Water Resources Management: A Case Study of Taihu Basin, China

    Directory of Open Access Journals (Sweden)

    Min Ge

    2017-01-01

    Full Text Available Clarification of initial water rights is the basis and prerequisite for a water rights trade-off market and also an effective solution to the problem of water scarcity and water conflicts. According to the new requirements for the most stringent water resources management in China, an initial provincial water rights allocation model is proposed. Firstly, based on analysis of multiple principles for initial provincial water rights allocation including total water use, water use efficiency, water quality of water function zones, regional coordination and sharing, an index system of initial provincial water rights allocation is designed. Secondly, according to dynamic projection pursuit technique, an initial provincial water rights allocation model with the total water use control is set up. Moreover, the self-adaptive chaotic optimization algorithm is applied to tackle the model. Finally, a case study of Taihu Basin is adopted. Considering the multiple scenarios of three different water frequencies (50%, 75% and 90% and planning year 2030, the empirical results show Jiangsu Province always obtains the most initial water rights. When the developing situation of provinces are given more consideration, Shanghai should acquire more initial water rights than Zhejiang Province; but when the dynamic increment evolving trend of provinces is taken more into account, Shanghai should obtain less initial water rights than Zhejiang Province. The case about Taihu Lake further verifies the feasibility and effectiveness of the proposed model and provides a multiple-scenarios decision making support for entitling the initial water rights with the most stringent water resources management constrains in Taihu Basin.

  15. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  16. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  17. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  18. Pro web project management

    CERN Document Server

    Emond, Justin

    2012-01-01

    Caters to an under-served niche market of small and medium-sized web consulting projects Eases people's project management pain Uses a clear, simple, and accessible style that eschews theory and hates walls of text

  19. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  20. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefull...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  1. Project Management Handbook

    OpenAIRE

    Hyttinen, Kirsi

    2017-01-01

    Project Management has become a core competency, and nearly every manager is involved in managing one or more projects. Moreover, the role of projects in organisations is receiving increasing attention.” In almost every organisation, projects are planned and run on a daily basis. At the same time, we are living in a hectic world with no time for massive reading exercises. This handbook aims to support both perspectives: to run projects smoothly, and to quickly find topics that are releva...

  2. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  3. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management of distr......Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  4. Western Kenya integrated ecosystem management project

    OpenAIRE

    Kenya Agricultural Research Institute (KARI)

    2007-01-01

    The project seeks to improve the productivity and sustainability of land use systems in selected watersheds in the Nzoia, Yala and Nyando river basins through adoption of an integrated ecosystem management approach. In order to achieve this the project will: (i) support on- and off-farm conservation strategies; and (ii) improve the capacity of local communities and institutions to identify, formulate and implement integrated ecosystem management activities (including both on-and off-farm land...

  5. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  6. Knowledge-based approaches for river basin management

    Directory of Open Access Journals (Sweden)

    P. Mikulecký

    2007-06-01

    Full Text Available Rare attempts to use knowledge technologies and other relevant approaches are found in the river basin management. Some applications of expert systems as well as utilization of soft computing techniques (as neural networks or genetic algorithms are known in an experimental level. Knowledge management approaches still have not been used at all. In this paper we discuss knowledge-based approaches in the river basin management as a difficult yet important direction which could be proven to be helpful. We summarize the research done in the scope of the AQUIN project, one of first Czech knowledge management projects in the river basin management. The project was initiated by the water management company in Pilsen, where dispatchers make decisions about manipulations on the reservoir Nýrsko, the strategic source of drinking water for inhabitants of Pilsen. The project aim was to support dispatchers' decision making under a high degree of uncertainty or data shortage. The research is continued in the scope of a new project AQUINpro, planned for the period of 2006 to 2008.

  7. How integrated is river basin management?

    Science.gov (United States)

    Downs, Peter W.; Gregory, Kenneth J.; Brookes, Andrew

    1991-05-01

    Land and water management is increasingly focused upon the drainage basin. Thirty-six terms recently used for schemes of “integrated basin management” include reference to the subject or area and to the aims of integrated river basin management, often without allusion to the multiobjective nature. Diversity in usage of terms has occurred because of the involvement of different disciplines, of the increasing coherence of the drainage basin approach, and the problems posed in particular parts of the world. The components included in 21 different approaches are analyzed, and, in addition to showing that components related broadly to water supply, river channel, land, and leisure aspects, it is concluded that there are essentially five interrelated facets of integrated basin management that involved water, channel, land, ecology, and human activity. Two aspects not fully included in many previous schemes concern river channel changes and the dynamic integrity of the fluvial system. To clarify the terminology used, it is suggested that the term comprehensive river basin management should be used where a wide range of components is involved, whereas integrated basin management can signify the interactions of components and the dominance of certain components in the particular area. Holistic river basin management is advocated as a term representing an approach that is both fully comprehensive and integrated but also embraces the energetics of the river system and consideration of changes of river channels and of human impacts throughout the river system. The paradigm of working with the river can be extended to one of working with the river in the holistic basin context.

  8. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  9. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  10. Agile Project Portfolio Management

    DEFF Research Database (Denmark)

    Andersen, Jesper Rank; Riis, Jens Ove; Mikkelsen, Hans

    2005-01-01

    This paper will provide a preliminary introduction to the application of Agile Thinking in management of project portfolio and company development. At any point in time, companies have a crowd of development initiatives spread around the organisation and managed at different levels...... in the managerial hierarchy. They compete for resources and managerial attention, and they often take too long time - and some do not survive in the rapid changing context. Top man¬agers ask for speed, flexibility and effectiveness in the portfolio of development activities (projects). But which competencies...

  11. Project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  12. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  13. Spatial Preference Heterogeneity for Integrated River Basin Management: The Case of the Shiyang River Basin, China

    Directory of Open Access Journals (Sweden)

    Fanus Asefaw Aregay

    2016-09-01

    Full Text Available Integrated river basin management (IRBM programs have been launched in most parts of China to ease escalating environmental degradation. Meanwhile, little is known about the benefits from and the support for these programs. This paper presents a case study of the preference heterogeneity for IRBM in the Shiyang River Basin, China, as measured by the Willingness to Pay (WTP, for a set of major restoration attributes. A discrete choice analysis of relevant restoration attributes was conducted. The results based on a sample of 1012 households in the whole basin show that, on average, there is significant support for integrated ecological restoration as indicated by significant WTP for all ecological attributes. However, residential location induced preference heterogeneities are prevalent. Generally, compared to upper-basin residents, middle sub-basin residents have lower mean WTP while lower sub-basin residents express higher mean WTP. The disparity in utility is partially explained by the difference in ecological and socio-economic status of the residents. In conclusion, estimating welfare benefit of IRBM projects based on sample responses from a specific sub-section of the basin only may either understate or overstate the welfare estimate.

  14. From project management to project leadership

    NARCIS (Netherlands)

    F. Braun; M. Avital

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we inv

  15. Enhanced project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  16. Management & Communication: Project Management Case Study

    CERN Document Server

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  17. Best Practices in Project Management

    OpenAIRE

    Liviu ILIES; Emil CRISAN; Ioana Natalia MURESAN

    2010-01-01

    Project management has evolved over time, becoming the principal mean of dealing with change in modern organizations. Best practices have occurred as a result of business evolution and of practicing project management at a global level. Best practices in project management, if followed, increase the chances of success in achieving goals when dealing with projects. In this article we present the concept of best practice, the advantages of using best practices in project management, which are t...

  18. Management and Development of the Western Resources Project

    Energy Technology Data Exchange (ETDEWEB)

    Terry Brown

    2009-03-09

    The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

  19. Integrated Project Management System description. [UMTRAP Project

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office ( Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs.

  20. OVERVIEW ABOUT PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2014-01-01

    Full Text Available The purpose of this study is to emphasize the main aspects regarding project quality management. This study tries to present in the comparative manner, different approaches of the main guidelines, international standards and methodologies regarding project quality management (the PMBOK ® Guide elaborated by the Project Management Institute, the PRINCE method elaborated by the British Office of Government Commerce etc.. The PMBOK® Guide describes three elements (processes of quality management: quality planning (plan quality management, quality assurance (perform quality assurance and quality control (control quality. The PMBOK approach regarding project quality management is that quality management must lead to achieving and validating project requirements. According the PRINCE method the quality is one of the six variables involved in any project. The PRINCE approach regarding project quality management considers that strategy in this field must lead to achieving just the level of quality needed to achieve in the project and not to ensuring the best quality.

  1. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...

  2. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  3. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  4. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  5. Scaling issues in sustainable river basin management

    Science.gov (United States)

    Timmerman, Jos; Froebich, Jochen

    2014-05-01

    Sustainable river basin management implies considering the whole river basin when managing the water resources. Management measures target at dividing the water over different uses (nature, agriculture, industry, households) thereby avoiding calamities like having too much, too little or bad quality water. Water management measures are taken at the local level, usually considering the sub-national and sometimes national effects of such measures. A large part of the world's freshwater resources, however, is contained in river basins and groundwater systems that are shared by two or more countries. Sustainable river basin management consequently has to encompass local, regional, national and international scales. This requires coordination over and cooperation between these levels that is currently compressed into the term 'water governance' . Governance takes into account that a large number of stakeholders in different regimes (the principles, rules and procedures that steer management) contribute to policy and management of a resource. Governance includes the increasing importance of basically non-hierarchical modes of governing, where non-state actors (formal organizations like NGOs, private companies, consumer associations, etc.) participate in the formulation and implementation of public policy. Land use determines the run-off generation and use of irrigation water. Land use is increasingly determined by private sector initiatives at local scale. This is a complicating factor in the governance issue, as in comparison to former developments of large scale irrigation systems, planning institutions at state level have then less insight on actual water consumption. The water management regime of a basin consequently has to account for the different scales of water management and within these different scales with both state and non-state actors. The central elements of regimes include the policy setting (the policies and water management strategies), legal setting

  6. Project culture using Agile project management in hand with traditional project management

    OpenAIRE

    Sigurjón Páll Kolbeins 1965

    2013-01-01

    The Agile “revolution” within software development projects is changing how we do project management. This paper looks at the project management culture in one of the big three commercial banks in Iceland and how it has evolved the past 6 years. How stakeholders perceive project management through the lenses of those who sponsor projects, supply resources to projects, manage the projects and deliver the projects. The paper takes a look at how Agile project management has changed the cultu...

  7. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...

  8. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and

  9. Fault Management Assistant (FMA) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — S&K Aerospace (SKA) proposes to develop the Fault Management Assistant (FMA) to aid project managers and fault management engineers in developing better and more...

  10. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...... has lived a somewhat quiet life in Denmark, which leads to the purpose of this chapter, which is to set the stage for rethinking project management in Denmark. The chapter is based on an empirical study within the Danish project management community and beyond where we discuss this rethinking process...

  11. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  12. Fundamentals of technology project management

    CERN Document Server

    Garton, Colleen

    2012-01-01

    Designed to provide software engineers, students, and IT professionals with an understanding of the fundamentals of project management in the technology/IT field, this book serves as a practical introduction to the subject. Updated with information on how Fundamentals of Project Management integrates with and complements Project Management Institute''s Project Management Body of Knowledge, this collection explains fundamental methodologies and techniques while also discussing new technology, tools, and virtual work environments. Examples and case studies are based on technology projects, and t

  13. Project Management in Higher Education

    Science.gov (United States)

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  14. Grande Ronde Basin Fish Habitat Enhancement Project : 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance R.; Powell, Russ M.

    1999-05-01

    The primary goal of ''The Grande Ronde Basin Fish Habitat Improvement Project'' is to access, create, improve, protect, and restore reparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin.

  15. [Upper Steele Bayou Projects : Yazoo River Basin, Mississippi

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a collection of documents related to four projects which were proposed by the U.S. Army, Corps of Engineers in the Yazoo River Basin. The Upper Yazoo Basin...

  16. Insights of project managers into the problems in project management

    Directory of Open Access Journals (Sweden)

    Peter Vincent Livesey

    2016-03-01

    Full Text Available A Delphi study using project managers who had managed projects in excess of $500 million was used to confirm the significance and frequency of problems resulting from the nature of projects. Using the results obtained from the Delphi study a ranking of the problems experienced in these projects was obtained by calculating a Relative Importance Index. Additionally, the Delphi panel members were asked their views concerning the need for traditional project management skills (hard skills and team management skills (soft skills as project size increased from below $50 million to over $500 million. A substantial increase in the need for both skills was indicated with the increase in the need for soft skills being the most significant.

  17. Klamath Basin Restoration Agreement Off-Project Water Program Sub-basin Analysis Flow Statistics

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — VERSION 5/15/2012 HYDROLOGICAL INFORMATION PRODUCTS FOR THE OFF-PROJECT WATER PROGRAM OF THE KLAMATH BASIN RESTORATION AGREEMENT By Daniel T. Snyder, John C. Risley,...

  18. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  19. Developing a Science-based River Basin Management Plan for the Kharaa River Basin, Mongolia

    Science.gov (United States)

    Karthe, Daniel

    2013-04-01

    The Kharaa River Basin (KRB), which is located north of Mongolia's capital Ulaanbaatar and south of Lake Baikal, was chosen as a model region for the development and implementation of an integrated water resources management consisting of a monitoring concept, technical measures and a capacity development program (Karthe et al. 2012a). The basin of the Kharaa River covers an area of 14534 km² that is partly mountaineous and largely covered by taiga and steppe. At its outlet, the 362 km Kharaa River has a mean long-term annual discharge of 12.1 m³/s (MoMo Consortium 2009). A highly continental climate results in limited water resources, and rising water consumption coupled with the effects of climate and land use change may in the future exacerbate this water scarcity (Malsy et al. 2012; Karthe et al. 2013). Whereas the environment in the upper part of the catchment is in a relatively pristine state, the mid- and downstream sections of the river are characterized by nearby industry, mining activities and intensive agriculture (Menzel et al. 2011), resulting in declining water quality and ultimately a degradation of aquatic ecosystems (Hofmann et al. 2010; Hartwig et al. 2012). Moreover, it is a problem for the supply of major cities like Darkhan which largely rely on alluvial aquifers containing shallow-depth groundwater (Mun et al. 2008). Currently, there are alarming signs of water quality deterioration. With regard to water provision, a major problem is the poor state of distribution infrastructures which were often built in the 1960s and 70s (Scharaw & Westerhoff 2011). Rather little is currently known about the water quality supplied to end users; the latter is even more dubious in the city's informal ger districts (Karthe et al. 2012b). One important goal of the research and development project "Integrated Water Resources Management in Central Asia: Model Region Mongolia" lies in the implementation of a holistic concept for water resources monitoring and

  20. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  1. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  2. Application Coherency Manager Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal describes an Application Coherency Manager that implements and manages the interdependencies of simulation, data, and platform information. It will...

  3. NICA project management information system

    Science.gov (United States)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  4. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia;

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  5. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  6. River basin management plans for the European Water Framework Directive

    NARCIS (Netherlands)

    Kronvang, B.; Bechmann, M.; Behrendt, H.; Ruboek, G.H.; Schoumans, O.F.

    2004-01-01

    The newly adopted EU water framework directive aims at protecting different water bodies by performing impact analysis and developing river basin management plans before 2009. The adoption of management measures in river basins demands that catchment managers are able to quantify the importance of d

  7. Mobile Project Management

    Directory of Open Access Journals (Sweden)

    Catalin BOJA

    2006-01-01

    Full Text Available Based on the development of new communication and data transfer technologies, the mobile solutions for the management process have been able to provide new ways to conduct management actions. This environment describes methods and tools available only here, which will bring information, speed and efficiency to any stage and component of the management process. The paper takes into discussion the impact of the technological development on the management process paradigm. The paper presents the main aspects regarding the business and management models used in mobile management. The role of mobile multimedia informatics applications in mobile management is highlighted.

  8. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  9. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  10. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  11. Agile Project Management with Scrum

    CERN Document Server

    Schwaber, Ken

    2009-01-01

    The rules and practices for Scrum-a simple process for managing complex projects-are few, straightforward, and easy to learn. But Scrum's simplicity itself-its lack of prescription-can be disarming, and new practitioners often find themselves reverting to old project management habits and tools and yielding lesser results. In this illuminating series of case studies, Scrum co-creator and evangelist Ken Schwaber identifies the real-world lessons-the successes and failures-culled from his years of experience coaching companies in agile project management. Through them, you'll understand how to

  12. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  13. Western Gas Sands Project: stratigrapy of the Piceance Basin

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, S. (comp.)

    1980-08-01

    The Western Gas Sands Project Core Program was initiated by US DOE to investigate various low permeability, gas bearing sandstones. Research to gain a better geological understanding of these sandstones and improve evaluation and stimulation techniques is being conducted. Tight gas sands are located in several mid-continent and western basins. This report deals with the Piceance Basin in northwestern Colorado. This discussion is an attempt to provide a general overview of the Piceance Basin stratigraphy and to be a useful reference of stratigraphic units and accompanying descriptions.

  14. Changes in groundwater recharge under projected climate in the upper Colorado River basin

    Science.gov (United States)

    Tillman, Fred; Gangopadhyay, Subhrendu; Pruitt, Tom

    2016-01-01

    Understanding groundwater-budget components, particularly groundwater recharge, is important to sustainably manage both groundwater and surface water supplies in the Colorado River basin now and in the future. This study quantifies projected changes in upper Colorado River basin (UCRB) groundwater recharge from recent historical (1950–2015) through future (2016–2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 climate projections. Simulated future groundwater recharge in the UCRB is generally expected to be greater than the historical average in most decades. Increases in groundwater recharge in the UCRB are a consequence of projected increases in precipitation, offsetting reductions in recharge that would result from projected increased temperatures.

  15. Changes in groundwater recharge under projected climate in the upper Colorado River basin

    Science.gov (United States)

    Tillman, Fred D.; Gangopadhyay, Subhrendu; Pruitt, Tom

    2016-07-01

    Understanding groundwater-budget components, particularly groundwater recharge, is important to sustainably manage both groundwater and surface water supplies in the Colorado River basin now and in the future. This study quantifies projected changes in upper Colorado River basin (UCRB) groundwater recharge from recent historical (1950-2015) through future (2016-2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 climate projections. Simulated future groundwater recharge in the UCRB is generally expected to be greater than the historical average in most decades. Increases in groundwater recharge in the UCRB are a consequence of projected increases in precipitation, offsetting reductions in recharge that would result from projected increased temperatures.

  16. A comparison of integrated river basin management strategies: A global perspective

    Science.gov (United States)

    Zhao, Chunhong; Wang, Pei; Zhang, Guanghong

    In order to achieve the integrated river basin management in the arid and rapid developing region, the Heihe River Basin (HRB) in Northwestern China, one of critical river basins were selected as a representative example, while the Murray-Darling Basin (MDB) in Australia and the Colorado River Basin (CRB) in the USA were selected for comparative analysis in this paper. Firstly, the comparable characters and hydrological contexts of these three watersheds were introduced in this paper. Then, based on comparative studies on the river basin challenges in terms of the drought, intensive irrigation, and rapid industrialization, the hydrological background of the MDB, the CRB and the HRB was presented. Subsequently, the river management strategies were compared in three aspects: water allocation, water organizations, and water act and scientific projects. Finally, we proposed recommendations for integrated river basin management for the HRB: (1) Water allocation strategies should be based on laws and markets on the whole basin; (2) Public participation should be stressed by the channels between governance organizations and local communities; (3) Scientific research should be integrated into river management to understand the interactions between the human and nature.

  17. Material Stabilization Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SPEER, D.R.

    1999-09-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  18. Rainwater Basin Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rainwater Basin Wetland Management District for the next 15 years. This plan outlines...

  19. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  20. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  1. Project Management with IT Security Focus

    Directory of Open Access Journals (Sweden)

    Felician Alecu

    2011-12-01

    Full Text Available The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress. Also, the project manger skills are highlighted in this specific context.

  2. Fault Management Technologies Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Given that SysML is becoming a standard for model-based systems engineering and Integration (SE&I), system health management (SHM)-related models will either be...

  3. Strategic Management of Large Projects

    Institute of Scientific and Technical Information of China (English)

    WangYingluo; LiuYi; LiYuan

    2004-01-01

    The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy is pointed out. The supporting system and characteristics of flexible strategy are analyzed. The changes of flexible strategy and integration of strategic management are discussed.

  4. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  5. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  6. Project management of business process

    OpenAIRE

    Jovanović, Slaviša

    2011-01-01

    This thesis presents one of the hottest areas in today's software industry, business process management (. Business Process Management has become an important tool for companies to hone their capabilities and business processes to adjust rapid and sudden changes in the marketplace and achieve the set of plans. Thesis is divided into two parts. The first section provides an overview of the scope of business process management through the project approach, historically defined its...

  7. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  8. Measurement of Software Project Management Effectiveness

    Science.gov (United States)

    2008-12-01

    software project managements will be presented. Project Management Institute’s (PMI, 2004) “Project Management Body of Knowledge Third Edition” ( PMBOK ...4. Monitoring and Controlling Process Group. 5. Closing Process Group. According to the PMBOK , these are not phases of a project and they may be...repeated for each phase where appropriate. PMBOK also identifies and lists nine project management knowledge areas: 1. Project Integration Management

  9. Black-tailed prairie dog management plan : Rainwater Basin Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan is for management of black-tailed prairie dogs on the Rainwater Basin Wetland Management District , Nebraska. A management plan is needed for...

  10. INTEGRATED PROJECT MANAGEMENT MEASURES IN CMMI

    OpenAIRE

    Mahmoud Khraiwesh

    2015-01-01

    Project management is quite important to execute projects effectively and efficiently. Project management is vital to projects success. The main challenge of project management is to achieve all project goals, taking into consideration time, scope, budget constraints, and quality. This paper will identify general measures for the two specific goals and its ten specific practices of Integrated Project management Process Area in Capability Maturity Model Integration (CMMI). CMMI is ...

  11. The San Luis Valley Project : Closed Basin Division : Facts and concepts about the project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fact and concept packet for the Closed Basin Division project serves as a reference and has background information. Commonly asked questions, information about...

  12. The San Luis Valley Project : Closed Basin Division : Design and planning of the project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This design and planning document for the Closed Basin Division is a public information packet. The packet describes the planning process, design of the project,...

  13. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  14. Project finance in Campos Basin; O 'Project Finance' na auto-suficiencia

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes; Mendonca, Roberto Wagner [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The present conquest of the self-sufficiency is a result of 3 decades of investments that started with the discovery of the well 1-RJS-9A in 1974. The second leap was the discovery of giant fields in the 1980 including Marlim (1984) and Albacora (1985) among others. This first two conquests were basically technical and were recognized by the OTC in 1991 and 2000. The third leap was the utilization of project finance structures. We examine the role of project finance in the main projects developed by the PETROBRAS E and P - Exploration and Production - segment in the Campos Basin region. These projects allowed PB to invest more than US$ 6 billion dollars in a five year interval increasing production in 12 oil fields by 75% in a 7 years interval which later enabled PB to be self-sufficient in oil production. The financial structures of Albacora, Barracuda, EVM and Marlim are shown and discussed in various aspects which including structure, schedule, conditionalities, warranties, management of the SPEs and relationship with international agencies. Considering the present quest of developing Tupi and Jupiter which might represent investments around US$ 80 billion and it's impacts to the PETROBRAS capital structure and risk this might be a useful discussion. (author)

  15. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  16. Software Project Management

    Science.gov (United States)

    1989-07-01

    incorporated into the sys- Kotler88 tem. Several interesting concepts are presented, but Kotler , P. Marketing Planning: Analysis, Planning, the bulk of the...Metzger87 Mantei, M. "The Effect of Programming Team Metzger, Philip W. Managing Programming Structures on Programming Tasks." Comm. ACM People: A Personal... Philips . Software Engi- Classic approach in organization theory. neering. Englewood Cliffs, N.J.: Prentice-Hall, 1988. Shannon75 An industrial approach

  17. Klamath Basin Restoration Agreement Off-Project Water Program Sub-basin Analysis Flow Statistics

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  18. Basin Management under the Global Climate Change (Take North-East Asia Heilongjiang -Amur Basin and Taihu Basin For Example)

    Science.gov (United States)

    Liu, S.; Zhou, Z.; Zhong, G.; Zhang, X.

    2015-12-01

    The impact of global climate change on environment and society causes increasingly concern in different countries around the world. The main climate characteristic values, such as precipitation and temperature, have been changed, which leads to the variation of water resources, especially in large basins. Heilongjiang-Amur Basin and Taihu Basin are two large and important basins in China with large area and population. As global climate change and human activities have siganificant impacts on hydrology and water resources in two basins, the analysis of climate change are of great value. In this study, in Heilongjiang-Amur Basin, precipitation and temperature are investigated and their variation are predicted. And in Taihu Basin, precipitation including plum rain and typhoon, are studied and the variation trend of precipitation is predicted. Hence, the impacts of global climate change are assessed. From the result, it shows that the average temperature will continue to increase, and the precipitation will reduce first and then turn to increase in these two basins. It demonstrates that the water resources have been affected a lot by climate change as well as human activities. And these conclusions are provided as reference for policy makers and basin authorities in water resources management and natural hazards mitigation. Meanwhile, according to basins' particualr characters, the suggestions to future water resources management in two basins are given, and more scientific, comprehensive and sustained managements are required. Especially, in Heilongjiang-Amur River, which is a boundary river between China and Russia, it is very essential to enhance the cooperation between two countries.

  19. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  20. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  1. Project Management in New Product Introduction Projects of a Company

    OpenAIRE

    Joenaho, Ilkka

    2016-01-01

    The success of projects is highly correlated to the way projects are managed. Project management is simply just an application of skills, tools, techniques and knowledge to project activities in a formal and systematic way. The company’s New Product Introduction projects have grown more complex over time and it has become necessary to evaluate current project management practices. The aim of this thesis was to study and evaluate the current state of New Product Introduction proje...

  2. Project Manager’s Handbook

    Science.gov (United States)

    1996-09-30

    the quick entry of the names of government personnel and contract positions. D-10 - - ’ I Contrad One click on Sum a brings up a screen similar to...milestones based on the contracting vehicle and estimated contract award date. D-11 - One click on this button will bring up the planned versus...once on the POC Input to JON button and then re-enter the Project Manager’s last name. Once the Project Manager’s name is entered, one click on the OK

  3. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  4. Methodological Aspects of Project Techniques Selection for Innovation Project Management

    Directory of Open Access Journals (Sweden)

    Anna Yakovleva

    2014-06-01

    Full Text Available Project Management offers a variety of methodologies which provides managers with different techniques and tools to use during project planning and implementation. At the same time there is a substantial lack of systematized approaches to the management of innovation projects. In this article key factors in the selection of appropriate techniques in innovation project management will first be identified. Theoretical analysis of different project management standards and possibility of their use will then be discussed. In addition how the techniques can be applied will be investigated through academic paper analysis. . This research makes a theoretical contribution to the field of project management by selecting and determining which project management techniques can be adapted and applied to innovation projects. Recommendations for practical application are based on theoretical findings of the research. These include two main factors, which are: influencing the choice of project management techniques and the structure of project selection process. The significance of the results obtained is confirmed by creation of theoretical knowledge, which permits to thoroughly understand and capture issues which may emerge during innovation project planning and implementation, through the use of established project management methodology. Keywords: Project management, Innovation, Project management standard, innovation project, PMBoK, PRINCE2, ICB.

  5. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

  6. The Project Manager Who Saved His Country

    Science.gov (United States)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  7. Problems of Syrdarya river basin management

    Institute of Scientific and Technical Information of China (English)

    Serdar EYEBERENOV; Baijing CAO; Fengting LI

    2009-01-01

    Prior to independence, Central Asian countries were closely interconnected through the regional management incorporating water, energy, and food sectors. This approach, supported by the central government of Union of Soviet Socialist Republics (USSR), functioned effectively - meeting the needs of both upstream and downstream countries. However, after independence, Central Asian countries started prioritizing their own economic development policies without due account to regional concerns such as joint use of water resources, leading to instability.In this study, the case of Syrdarya basin was investigated to show how,such strategies create tension in the region, since primary focus is given to national interests, without consideration for regional problems. To address this issue, an integrated approach to incorporating water,energy, and agriculture is needed. It is suggested that a single sector approach on water alone does not lead to stability, and a multi-sectoral approach is necessary to ensure sustainable development. Countries sharing benefits from the river have to be responsible for costs of operation and maintenance of the water facilities.

  8. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

    2001-04-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old

  9. Land Protection Plan: Rainwater Basin Wetland Management District Expansion

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Land Protection Plan (LLP) describes the priorities for acquiring additional acres within the boundary of the Rainwater Basin Wetland Management District. The...

  10. KMUT – Project Management Toolbox

    Directory of Open Access Journals (Sweden)

    Stefanie Quade

    2013-05-01

    Full Text Available Small and medium-sized enterprises (SMEs are increasingly dealing with international projects and distributed (sometimes even virtual teams. Consequently, they are looking for project management (PM tools which fit their respective needs regarding communication and collaboration. Unfortunately, the majority of the PM software available in the market seems to be oversized for this purpose. Instead most project managers are requesting smart solutions that allow quick implementation without any significant organisational or technical change. Within the research project InterComp SME 2.0 we combine theoretical research and real business to develop hands-on solutions for SMEs. This paper describes an effective approach for a “PM Toolbox” that allows finding the right project tool for a specific project need. The toolbox has been developed in due consideration of user stories gained from business practice, a more detailed SME business survey, a theoretical PM meta model and a market of PM tools. Since the business survey revealed that the readiness to use and test a “toolbox” is highly dependent on the type of user and his or her technical background, we designed the system based on use cases and user typology. As a result, we suggest a framework of open, freely available, easy-to-install, single and multi purpose PM software tools which can be selected solely on a need basis. With this free platform we want to guide practitioners through the tool jungle with the potential to grow into a lively community.

  11. 76 FR 56363 - Capital Project Management

    Science.gov (United States)

    2011-09-13

    ... project activities. See, e.g., Project Management Institute, Body of Knowledge (2004), Ch. 11. This NPRM... Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY: Federal...: This proposal would transform the current FTA rule for project management oversight into a discrete...

  12. Conceptualizing Knowledge Communication for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2015-01-01

    In the field of project management, the search for better ways to manage projects is ongoing. One of the more recent trends in the literature focuses on the integration of knowledge management in project management environments. Advantages of integrating knowledge management into projects can...... be seen by the 2007 Project of the Year, where the Project Manager used knowledge management and transparent communication with stakeholders, resulting in a project that finished years early and was substantially under budget. (Hildebrand 2008) Knowledge management relies on communication practices. Seely...... Brown and Nonaka, among other scholars, imply that communication is central to knowledge management; however, concepts related to how communication about project knowledge works at the operational level are implicit or out of focus. To place communication more centrally in our understanding of project...

  13. Project Portfolio Management Prototype Application Design

    OpenAIRE

    Paul POCATILU

    2007-01-01

    The management of project portfolio in a company requires the use of specific software, especially when the number of projects is significant. This paper is based on the Methodology for the development of IT projects portfolio management applications research project. This paper presents some of the results of a project portfolio application design.

  14. Project Portfolio Management Prototype Application Design

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available The management of project portfolio in a company requires the use of specific software, especially when the number of projects is significant. This paper is based on the Methodology for the development of IT projects portfolio management applications research project. This paper presents some of the results of a project portfolio application design.

  15. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  16. Enhancing Floodplain Management in the Lower Mekong River Basin Using Vegetation and Water Cycle Satellite Observations

    Science.gov (United States)

    Bolten, J. D.; Spruce, J.; Wilson, R.; Strauch, K.; Doyle, T.; Srinivan, R.; Lakshmi, V.; Gupta, M.

    2014-12-01

    The Lower Mekong River Basin shared by China, Burma, Laos, Thailand, Cambodia, and Vietnam, is considered the lifeblood of Southeast Asia. The Mekong Basin is subject to large hydrological fluctuations on a seasonal and inter-annual basis. The basin remains prone to severe annual floods that continue to cause widespread damage and endanger food security and the livelihood of the millions who dwell in the region. Also the placement of newly planned dams primarily for hydropower in the Lower Mekong Basin may cause damaging social, agriculture and fisheries impacts to the region where we may now likely be at a critical 'tipping point'. The primary goal of this project is to apply NASA and USGS products, tools, and information for improved flood and water management in the Lower Mekong River Basin to help characterize, understand, and predict future changes on the basin. Specifically, we are providing and helping transfer to the Mekong River Commission (MRC) and the member countries of Thailand, Cambodia, Lao, Vietnam, and Burma the enhanced Soil and Water Assessment Tool (SWAT) using remotely sensed surface, ground water, and root zone soil moisture along with improved Land Use and Land Cover (LULC) maps. In order to estimate the flood potential and constrain the SWAT Available Water Capacity model parameter over the region, we are assimilated GRACE Terrestrial Water Storage observations into the Catchment Land Surface Model. In addition, a Graphic Visualization Tool (GVT) as been developed to work in concert with the output of the SWAT model parameterized for the Mekong Basin as an adjunct tool of the MRC Decision Support Framework. The project requires a close coordination of the development and assessment of the enhanced MRC SWAT with the guidance of MRC resource managers and technical advisors. This presentation will evaluate the skill of the enhanced SWAT model using qualitative (i.e., MODIS change detection) and quantitative (e.g., streamflow) metrics over one

  17. Using Stochastic Dynamic Programming to Support Water Resources Management in the Ziya River Basin, China

    DEFF Research Database (Denmark)

    Davidsen, Claus; Cardenal, Silvio Javier Pereira; Liu, Suxia;

    2015-01-01

    of stochastic dynamic programming, to optimize water resources management in the Ziya River basin. Natural runoff from the upper basin was estimated with a rainfall-runoff model autocalibrated using in situ measured discharge. The runoff serial correlation was described by a Markov chain and used as input...... for the optimization model. This model was used to assess the economic impacts of ecosystem minimum flow constraints, limited groundwater pumping, and the middle route of the South–North Water Transfer Project (SNWTP). A regional climate shift has exacerbated water scarcity and increased water values, resulting...... in stricter water management. The results show that the SNWTP reduces the impacts of water scarcity and impacts optimal water management in the basin. The presented modeling framework provides an objective basis for the development of tools to avoid overpumping groundwater resources at minimum costs....

  18. Projected hydrologic changes in monsoon-dominated Himalaya Mountain basins with changing climate and deforestation

    Science.gov (United States)

    Neupane, Ram P.; White, Joseph D.; Alexander, Sara E.

    2015-06-01

    In mountain headwaters, climate and land use changes affect short and long term site water budgets with resultant impacts on landslide risk, hydropower generation, and sustainable agriculture. To project hydrologic change associated with climate and land use changes in the Himalaya Mountains, we used the Soil and Water Assessment Tool (SWAT) calibrated for the Tamor and Seti River basins located at eastern and western margins of Nepal. Future climate change was modeled using averaged temperature and precipitation for 2080 derived from Special Report on Emission Scenarios (SRES) (B1, A1B and A2) of 16 global circulation models (GCMs). Land use change was modeled spatially and included expansion of (1) agricultural land, (2) grassland, and (3) human settlement area that were produced by considering existing land use with projected changes associated with viability of elevation and slope characteristics of the basins capable of supporting different land use type. From these simulations, higher annual stream discharge was found for all GCM-derived scenarios compared to a baseline simulation with maximum increases of 13 and 8% in SRES-A2 and SRES-A1B for the Tamor and Seti basins, respectively. On seasonal basis, we assessed higher precipitation during monsoon season in all scenarios that corresponded with higher stream discharge of 72 and 68% for Tamor and Seti basins, respectively. This effect appears to be geographically important with higher influence in the eastern Tamor basin potentially due to longer and stronger monsoonal period of that region. However, we projected minimal changes in stream discharge for the land use scenarios potentially due to higher water transmission to groundwater reservoirs associated with fractures of the Himalaya Mountains rather than changes in surface runoff. However, when combined the effects of climate and land use changes, discharge was moderately increased indicating counteracting mechanisms of hydrologic yield in these mountains

  19. Managing Projects Well What They Don't Teach You in Project Management School

    CERN Document Server

    Bender, Stephen A

    1999-01-01

    Few people realise how many projects people actually manage. Or how many of the theoretical approaches to Project Management do not meet the test of the real world. This intensive look at Project Management teaches people what they need to know to lead, or be a member of, a project team. Most Project Management texts deal predominantly with technical areas, leaving readers ill-prepared for the real world. Managing Projects Well looks closely at the behavioural aspects of project management and project team participation. .Managing Projects Well shows:. What happens when your boss decides the p

  20. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  1. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  2. Managing Water Resource Challenges in the Congo River Basin

    Science.gov (United States)

    Aloysius, N. R.

    2015-12-01

    Water resources in the tropical regions are under pressure from human appropriation and climate change. Current understanding of interactions between hydrology and climate in the tropical regions is inadequate. This is particularly true for the Congo River Basin (CRB), which also lacks hydroclimate data. Global climate models (GCM) show limited skills in simulating CRB's climate, and their future projections vary widely. Yet, GCMs provide the most credible scenarios of future climate, based upon which changes in water resources can be predicted with coupled hydrological models. The objectives of my work are to i) elucidate the spatial and temporal variability of water resources by developing a spatially explicit hydrological model suitable for describing key processes and fluxes, ii) evaluate the performance of GCMs in simulating precipitation and temperature and iii) develop a set of climate change scenarios for the basin. In addition, I also quantify the risks and reliabilities in smallholder rain-fed agriculture and demonstrates how available water resources can be utilized to increase crop yields. Key processes and fluxes of CRB's hydrological cycle are amply characterized by the hydrology model. Climate change projections are evaluated using a multi-model ensemble approach under different greenhouse gas emission scenarios. The near-term projections of climate and hydrological fluxes are not affected by emission scenarios. However, towards the mid-21st century, projections are emission scenario dependent. Available freshwater resources are projected to increase in the CRB, except in the semiarid southeast. These increases present new opportunities and challenges for augmenting human appropriation of water resources. By evaluating agricultural water requirements, and timing and availability of precipitation, I challenge the conventional wisdom that low agriculture productivities in the CRB are primarily attributable to nutrient limitation. Results show that

  3. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  4. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  5. Interrelations of the Caroni River Basin ecosystems and hydroelectric power projects

    Energy Technology Data Exchange (ETDEWEB)

    Morales, L.C.; Gorzula, S.

    The Caroni is the river with the greatest hydroelectric potential in Venezuela. Large scale hydroelectric projects produce environmental impacts upstream from the dam, due to the formation of an artificial lake, and downstream from the dam, by regulating the river's flow rate. The useful life of a dam for the production of hydroelectricity depends on the rate at which it fills up with sediments, and it's efficiency depends on the maintenance of the hydrological and limnological conditions upon which it was designed. These parameters must be monitored for the duration of the project, and any changes in them must be evaluated. Both environmental impact evaluation and river basin management require basic data about the ecosystems that make up the river basin. However, both the type and detail of the required research to produce base line data must be defined carefully.

  6. Project Management – Multi-perspective Leadership

    DEFF Research Database (Denmark)

    Riis, Eva

    2014-01-01

    Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse......”Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse...

  7. Adaptation of Agile Project Management Methodology for Project Team

    OpenAIRE

    Rasnacis Arturs; Berzisa Solvita

    2015-01-01

    A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptat...

  8. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  9. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  10. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ... TRANSPORTATION Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY... Capital Project Management to December 2, 2011, to allow interested parties time to carefully review the...) proposing to transform the current FTA rule for project management oversight into a discrete set...

  11. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  12. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  13. Managing for timber and biodiversity in the Congo Basin

    DEFF Research Database (Denmark)

    Nasi, Robert; Billand, Alain; van Vliet, Nathalie

    2012-01-01

    Multiple-use forest management is considered by many as a preferable alternative to single-use, generally timber-dominant, management models. In the Congo Basin rainforests, integration of timber and non-timber forest resources plays a key role in the subsistence and market economies of rural...

  14. Coupling the hydrological and ecological process to implement the sustainable water resources manage-ment in Hanjiang River Basin

    Institute of Scientific and Technical Information of China (English)

    ZHANG Xiang; XIA Jun

    2009-01-01

    Research on the combination of hydrological variation and ecological demands plays an important role In water availability assessment and sustainable management on basin scale.An integrative frame, consisting of hydrological regime modelling, ecological water demands estimation and renewable re-sources management, is given in this paper in order to support the implementation of the sustainable water resources management.The suggested integrative frame has been used to study the integrated water resources management in southern Hanjiang River Basin which is the water source of South-to-North Water Transportation Project in China.SWAT (soil and water assessment tool) model was used to simulate the monthly averaging streamflow and the amounts of ecological water demands in stream were also estimated in order to evaluate the available water resources for the local users and the transportation project.Then we formed the developing scenarioes by coupling the available water re-sources, the recovering rate of water resources in natural water cycle, the local water use rate and the amounts of the water transported to North, and used the Scheafer model to analyze their evolving tra-jectories.Eventually, the sustainable water resources management measures were assembled by the comprehensive evaluation of the scenarioea.The research indicates that the integrative frame provided a new way for the integrated water resources management in river basin.

  15. Integrated Pest Management Plan Rainwater Basin Wetland Management District 2004-2008

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Rainwater Basin WMD....

  16. Project Management: From Site Office to Project Department

    Institute of Scientific and Technical Information of China (English)

    Mi Jinsheng

    2008-01-01

    @@ To a construction company,the department of project is the basic unit,and project management is of basic content.With 30 years experiences in market practice since the relorm and opening up,project management is developing its own style according to the real situation in China.

  17. Digital spatial data as support for river basin management: The case of Sotla river basin

    Directory of Open Access Journals (Sweden)

    Prah Klemen

    2013-01-01

    Full Text Available Many real-world spatially related problems, including river-basin planning and management, give rise to geographical information system based decision making, since the performance of spatial policy alternatives were traditionally and are still often represented by thematic maps. Advanced technologies and approaches, such as geographical information systems (GIS, offer a unique opportunity to tackle spatial problems traditionally associated with more efficient and effective data collection, analysis, and alternative evaluation. This paper discusses the advantages and challenges of the use of digital spatial data and geographical information systems in river basis management. Spatial data on social, environmental and other spatial conditions for the study area of 451.77 km2, the Slovenian part of the Sotla river basin, are used to study the GIS capabilities of supporting spatial decisions in the framework of river basin management.

  18. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  19. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  20. Integrated management of operations in Santos Basin: methodology applied to a new philosophy of operations

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Leandro Leonardo; Lima, Claudio Benevenuto de Campos [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Derenzi Neto, Dario [Accenture, Rio de Janeiro, RJ (Brazil); Pinto, Vladimir Steffen [Soda IT, Rio de Janeiro, RJ (Brazil); Lima, Gilson Brito Alves [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2012-07-01

    The objective of this paper is to present the methodology used to develop the Integrated Management of Operations (GIOp) project in Santos Basin Operational Unit (UO-BS) in the South-Southeast Exploration and Production area of PETROBRAS. The following text describes how the activities were carried out to gather improvements opportunities and to design To-Be processes, considering the challenging environment of the Santos Basin in the coming years. At the end of more than 12 months of work, more than 50 processes and sub-processes were redesigned, involving a multidisciplinary team in the areas of operations, maintenance, safety, health and environment, flow assurance, wells, reservoirs and planning. (author)

  1. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led......, managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... to partial recovery of the project but not until several coping strategies had been tried....

  2. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...... a foundation for further development of both rethinking project management and Project Half Double......./value – The paper presents how stakeholders from Danish industry interpret the actuality in projects and how they want to move forward with a radically different project paradigm. This is expressed in the 10 leading stars and ILF method, which is compared and contrasted to the existing RPM literature providing...

  3. Fifteenmile Basin Habitat Enhancement Project: Annual Report FY 1988.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Roger C.; Marx, Steven D.

    1989-04-01

    The goal of the Fifteenmile Creek Habitat Enhancement Project is to improve wild winter steelhead in the Fifteenmile Creek Basin under the Columbia River Basin Fish and Wildlife Program. The project is funded by through the Bonneville Power Administration. Cooperators in the habitat enhancement project include the USDA Forest Service, Wasco County Soil and Water Conservation District and the Confederated Tribes of the Warms Springs. Installation of instream fish habitat structures was completed on four miles of Ramsey Creek and on one mile of Fifteenmile Creek. One hundred thirty-five structures were installed in treatment areas. Construction materials included logs and rock. Riparian protection fencing was completed on Dry Creek and Ramsey Creek worksites. Five and one-half miles of new fence was added to existing fence on Ramsey Creek to afford riparian protection to four miles of stream. Six miles of stream on Dry Creek will be afforded riparian protection by constructing 4.5 miles of fence to complement existing fence. 2 refs., 5 figs.

  4. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  5. Assessing Management Regimes in Transboundary River Basins: Do They Support Adaptive Management?

    Directory of Open Access Journals (Sweden)

    Eduard Interwies

    2008-06-01

    Full Text Available River basin management is faced with complex problems that are characterized by uncertainty and change. In transboundary river basins, historical, legal, and cultural differences add to the complexity. The literature on adaptive management gives several suggestions for handling this complexity. It recognizes the importance of management regimes as enabling or limiting adaptive management, but there is no comprehensive overview of regime features that support adaptive management. This paper presents such an overview, focused on transboundary river basin management. It inventories the features that have been claimed to be central to effective transboundary river basin management and refines them using adaptive management literature. It then collates these features into a framework describing actor networks, policy processes, information management, and legal and financial aspects. Subsequently, this framework is applied to the Orange and Rhine basins. The paper concludes that the framework provides a consistent and comprehensive perspective on transboundary river basin management regimes, and can be used for assessing their capacity to support adaptive management.

  6. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  7. Improving Hydro-Climatic Projections with Bias-Correction in Sahelian Niger Basin, West Africa

    Directory of Open Access Journals (Sweden)

    Ganiyu Titilope Oyerinde

    2017-02-01

    Full Text Available Climate simulations in West Africa have been attributed with large uncertainties. Global climate projections are not consistent with changes in observations at the regional or local level of the Niger basin, making management of hydrological projects in the basin uncertain. This study evaluates the potential of using the quantile mapping bias correction to improve the Coupled Model Intercomparison Project (CMIP5 outputs for use in hydrological impact studies. Rainfall and temperature projections from 8 CMIP5 Global Climate Models (GCM were bias corrected using the quantile mapping approach. Impacts of climate change was evaluated with bias corrected rainfall, temperature and potential evapotranspiration (PET. The IHACRES hydrological model was adapted to the Niger basin and used to simulate impacts of climate change on discharge under present and future conditions. Bias correction with quantile mapping significantly improved the accuracy of rainfall and temperature simulations compared to observations. The mean of six efficiency coefficients used for monthly rainfall comparisons of 8 GCMs to the observed ranged from 0.69 to 0.91 and 0.84 to 0.96 before and after bias correction, respectively. The range of the standard deviations of the efficiency coefficients among the 8 GCMs rainfall data were significantly reduced from 0.05–0.14 (before bias correction to 0.01–0.03 (after bias correction. Increasing annual rainfall, temperature, PET and river discharge were projected for most of the GCMs used in this study under the RCP4.5 and RCP8.5 scenarios. These results will help improving projections and contribute to the development of sustainable climate change adaptation strategies.

  8. The Environmental Management Project Manager`s Handbook for improved project definition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  9. The Australian central Eromanga Basin project: An introduction

    Science.gov (United States)

    Moss, F. J.; Wake-Dyster, K. D.

    1983-12-01

    The Australian Bureau of Mineral Resources is carrying out a major multidisciplinary program of geological and geophysical studies in southwestern Queensland in cooperation with the Geological Survey of Queensland. The project is aimed at providing information on the regional structure and depositional history of the central Eromanga Basin and the underlying Adavale, Cooper and Galilee basins. The information being obtained is particularly relevant to a better understanding of the petroleum prospectivity of the area. The program includes geophysical surveys involving 1400 km of new six-fold CDP seismic reflection coverage on regional traverses up to 400 km long crossing the main structural elements of the area; gravity measurements along all new seismic reflection traverses; refraction surveys along two major east-west and north-south traverses and magnetotelluric soundings along the same major east-west traverse. LANDSAT imagery studies are providing new perspective on many regional structures when used in conjunction with seismic and gravity information. Wireline logs and synthetic seismograms are being used with the new seismic data to re-examine stratigraphic correlations. Palynologic and lithologic studies are underway to assist in determining depositional environments. Source rock, maturation, hydrological and geochemical studies are providing information on the generation and migration of hydrocarbons. A significant feature of the program is the extension of the recording time of all new reflection data to 20 s to obtain good quality deep crustal reflection information comparable to that obtained on COCORP programs in the United States. The reflection data is being interpreted with the refraction, gravity and magnetotelluric data to investigate the relationship of deep crustal and upper mantle features to the sedimentary basins in the central Eromanga Basin area.

  10. INTEGRATED PROJECT MANAGEMENT MEASURES IN CMMI

    Directory of Open Access Journals (Sweden)

    Mahmoud Khraiwesh

    2015-10-01

    Full Text Available Project management is quite important to execute projects effectively and efficiently. Project management is vital to projects success. The main challenge of project management is to achieve all project goals, taking into consideration time, scope, budget constraints, and quality. This paper will identify general measures for the two specific goals and its ten specific practices of Integrated Project management Process Area in Capability Maturity Model Integration (CMMI. CMMI is a framework for improvement and assessment of computer information systems. The method we used to define the measures is to apply the Goal Questions Metrics (GQM paradigm to the two specific goals and its ten specific practices of Integrated Project management Process Area in CMMI.

  11. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  12. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  13. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ... Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY: Federal... revise the agency's project management oversight regulations, in light of the recent, fundamental changes... Progress in the 21st Century Act (``MAP-21''). FTA will reinitiate a rulemaking for project...

  14. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  15. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  16. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  17. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  18. Relationship between the IT projects performance and project management maturity

    Directory of Open Access Journals (Sweden)

    Renato de Oliveira Moraes

    2013-03-01

    Full Text Available This paper presents a study on the relationship between performance of IT projects and the project management maturity of performing organization. The research was conducted through a survey with 185 respondents during the year 2010. The project performance was evaluated through the first two dimensions Shenhar et al (2001 - project efficiency and customer impact. The maturity of project management was assessed by the level of formalization of procedures for project management described in PMBoK. The data were analyzed using statistical procedures (factor analysis, Cronbach's alpha, cluster analysis and bivariate analysis and revealed that (i that organizations with higher maturity have a superior performance in their projects, and (ii different dimensions of maturity has different impacts on the performance of IT projects.

  19. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  20. 43 CFR 418.29 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29....29 Project management. In addition to the provisions of § 418.28, if the District is found to be... management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of...

  1. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  2. Scheduling in Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2015-01-01

    Full Text Available This issue presents five papers selected from the 2013 (4th International Conference on Engineering, Project, and Production Management (EPPM2013 held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  3. Uranium Mill Tailings Remedial Action Project surface project management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  4. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  5. 77 FR 45653 - Yakima River Basin Conservation Advisory Group; Yakima River Basin Water Enhancement Project...

    Science.gov (United States)

    2012-08-01

    ... Bureau of Reclamation Yakima River Basin Conservation Advisory Group; Yakima River Basin Water... on the structure, implementation, and oversight of the Yakima River Basin Water Conservation Program... of the Water Conservation Program, including the applicable water conservation guidelines of...

  6. Interaction between stakeholders and research for integrated river basin management

    NARCIS (Netherlands)

    Jongman, R.H.G.; Padovani, C.R.

    2006-01-01

    Integrated Water Management calls for basin-wide coordination of activities related to land and water use. The need for multi-stakeholder involvement, the necessity to integrate scientific approaches and local information, the process of mutual communication, the results of discussions on integrated

  7. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  8. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  9. Reducing the basin vulnerability by land management practices under past and future climate: a case study of the Nam Ou River Basin, Lao PDR

    Science.gov (United States)

    Maharjan, M.; Babel, M. S.; Maskey, S.

    2014-08-01

    This research evaluates different land management practices for the Nam Ou River Basin in Northern Laos for reducing vulnerability of the basin due to erosion and sediment yield under existing and future climate conditions. We use climate projection data (precipitation and temperature) from three general circulation models (GCMs) for three greenhouse gas emission scenarios (GHGES), namely B1, A1B and A2 and three future periods, namely 2011-2030, 2046-2065 and 2080-2099. These large resolution GCM data are downscaled using the Long Ashton Research Station-Weather Generator (LARS-WG). The Soil and Water Assessment Tool (SWAT), which is a process based hydrological model, is used to simulate discharge and sediment yield and a threshold value of annual sediment yield is applied to identify vulnerable sub-basins. Results show that the change in the annual precipitation is expected to be between -7.60 to 2.64% in 2011-2030, -8.98 to 11.85% in 2046-2065, and -11.04 to 25.84% in 2080-2099. In the meantime, the changes in mean monthly temperature vary from 0.3 to 1.3 °C in the 2011-2030, 1.3 to 2.9 °C in the 2046-2065 and 1.9 to 4.9 °C in the 2080-2099. Five sub-basins are identified vulnerable (critical) under the current climate. Our results show that terracing is the most effective land management practice to reduce sediment yield in these sub-basins followed by strip-cropping and filter strip. Appropriate land management practices applied under future climate scenarios show significant reduction in sediment yield (i.e. up to the tolerance limit) except for some sub-basins. In these exceptional sub-basins, designing an optimum combination of management practices is essential to reduce the vulnerability of the basin.

  10. Sedimentation retention basin utilization for best management practice

    Institute of Scientific and Technical Information of China (English)

    Zaheer Iqbal; CUI Guang-bo; ZHANG Li-qiong

    2003-01-01

    Approaches to the artificial impoundment and theoretical design of sedimentation retention basin are reviewed with particular attention to best management practice(BMP) to control agriculture and surface runoff. Sediments retention basins are the small version of farm pond used where a criteria of farm pond is not met. Such basin traps the pollutants and suspended solids prior to entry into streams and lakes. The study is focused with special reference to the assessment and control of non-point source pollution(NPSP) from the sub-basin area of Tai Lake in the Xishan County of Wuxi City of China. The author suggested two different approaches to conduct this study including theoretical design for sedimentation retention basin and computation of flow, sediment transport and deposition during the artificial impoundment of retention basin for BMP's utilization. Theoretical design will provide a useful function as a first line defense against the movement of sediments and transport of pollutants into the Tai Lake while the assessment of sediments deposition will help to make its proper use and periodic cleanup.

  11. Project Management Concepts, Methods, and Techniques

    CERN Document Server

    Maley, Claude H

    2011-01-01

    In order to succeed in today's increasingly competitive environment, corporations, companies, governments, and nonprofit organizations must be conversant with modern project management techniques. This is especially true for individuals looking to remain professionally competitive. Illustrating the why, what, and how of project management, Project Management Concepts, Methods, and Techniques will help readers develop and refine the skills needed to achieve strategic objectives. It presents a balanced blend of detailed explanatory texts and more than 200 illustrations to supply readers with act

  12. IT project management 30 steps to success

    CERN Document Server

    Doraiswamy, Premanand

    2011-01-01

    This pocket guide is designed to help IT project managers to succeed, and is based on the author's years of experience in IT project management. The guide's step-by-step approach will enable those new to IT project management, or intending to make a career in this field, to master the essential skills. For seasoned professionals, the pocket guide offers an invaluable concise reference guide.

  13. Changing Pedagogical Means in Project Management

    DEFF Research Database (Denmark)

    Thorsteinsson, Uffe

    1998-01-01

    Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet.......Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet....

  14. Managing complex industrial change through projects

    OpenAIRE

    Perotti, Clément; Minel, Stéphanie; Benoit, Roussel; Jean, Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  15. Amine Swingbed Payload Project Management

    Science.gov (United States)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  16. Research, demonstration, and extension: the ARS area-wide ecologically based invasive plant management project

    Science.gov (United States)

    The Area-wide project is a collaborative five year effort funded in 2008 by USDA-ARS that has brought together scientists with the USDA-ARS, universities, land managers, and policy makers throughout the Great Basin. A primary goal of the project is to develop and implement a comprehensive, regional...

  17. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  18. Fish and Wildlife report for the Closed Basin Division : San Luis Valley Project Colorado

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report for the Closed Basin Division is a description of the project and the fish and wildlife resources associated with the project. The document also reports...

  19. Western Gas Sands Project. Quarterly Basin Activities Report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-01-31

    This report is a summation of 3 months' drilling and testing activities in the four primary WGSP study areas: Greater Green River Basin, Northern Great Plains Province, Piceance Basin, and Uinta Basin. The monitoring of basin activities is part of resource assessment. (DLC)

  20. Western Gas Sands Project Quarterly Basin Activities Report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-04-30

    This quarterly basin activities report is a summation of three months drilling and testing activities in the Greater Green River Basin, Northern Great Plains Province, Piceance Basin, and Uinta Basin. Detailed information is given for each study area for the first quarter of 1979.

  1. Implementing Integrated Catchment Management in the upper Limpopo River basin: A situational assessment

    Science.gov (United States)

    Mwenge Kahinda, J.; Meissner, R.; Engelbrecht, F. A.

    2016-06-01

    A three-phase study was initiated as a way to promote Integrated Catchment Management approaches in the Limpopo River basin. This paper presents the situational assessment, which should enable De Beers to understand how their Venetia Mine operations are located within a broader and highly dynamic socio-economic and ecohydrological landscape as it pertains to water risks. The second phase, Risk assessment, aims to develop conservation interventions in the identified areas; the third phase will develop mechanisms for implementing water stewardship schemes to mitigate the shared water risks. Analysis of the social-ecological system (hydrological, climatic, ecological, socio-economic and governance systems) of the Limpopo River basin indicates that the institutional arrangement of the Limpopo River basin is neither simple nor effective. The basin is rapidly approaching closure in the sense that almost all of the available supplies of water have already been allocated to existing water users. If the proposed ecological flow requirements were to be met for all of the tributaries, the basin would be 'closed'. On-going and projected land use changes and water resources developments in the upper reaches of the basin, coupled with projected rainfall reductions and temperature increases, and allocation of the flows for the ecological reserve, are likely to further reduce downstream river flows. The coupled increase in temperature and decrease in rainfall is of great concern for everyone in the basin, especially the poorer communities, who rely on rain-fed agriculture for their livelihoods. Increased temperatures also lead to increased evaporation from reservoirs and therefore result in a decrease in water availability. This will lead to increased abstraction of groundwater, especially from alluvial aquifers, and consequently an increase in river transmission losses and a decrease in river flows.

  2. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  3. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  4. Management model application at nested spatial levels in Mediterranean Basins

    Science.gov (United States)

    Lo Porto, Antonio; De Girolamo, Anna Maria; Froebrich, Jochen

    2014-05-01

    In the EU Water Framework Directive (WFD) implementation processes, hydrological and water quality models can be powerful tools that allow to design and test alternative management strategies, as well as judging their general feasibility and acceptance. Although in recent decades several models have been developed, their use in Mediterranean basins, where rivers have a temporary character, is quite complex and there is limited information in literature which can facilitate model applications and result evaluations in this region. The high spatial variability which characterizes rainfall events, soil hydrological properties and land uses of Mediterranean basin makes more difficult to simulate hydrological and water quality in this region than in other Countries. This variability also has several implications in modeling simulations results especially when simulations at different spatial scale are needed for watershed management purpose. It is well known that environmental processes operating at different spatial scale determine diverse impacts on water quality status (hydrological, chemical, ecological). Hence, the development of management strategies have to include both large scale (watershed) and local spatial scales approaches (e.g. stream reach). This paper presents the results of a study which analyzes how the spatial scale affects the results of hydrologic process and water quality of model simulations in a Mediterranean watershed. Several aspects involved in modeling hydrological and water quality processes at different spatial scale for river basin management are investigated including model data requirements, data availability, model results and uncertainty. A hydrologic and water quality model (SWAT) was used to simulate hydrologic processes and water quality at different spatial scales in the Candelaro river basin (Puglia, S-E Italy) and to design management strategies to reach as possible WFD goals. When studying a basin to assess its current status

  5. On the weak project construction cost management

    Institute of Scientific and Technical Information of China (English)

    高守刚; 姜婧; 李玲

    2013-01-01

    the weak cost management is the most talked about topics in the weak industry, but also the basis of the weak construction business management and focus. With the increasingly fierce market competition, weak construction enterprises, the competition among enterprises wil gradual y transition from product quality competition to price competition. To strengthen the management of the weak construction enterprises cost, cut public spending ef iciency, improve market competitiveness, wil be the main way most weak construction corporate earnings and long-term business strategy. Based on the to weak project construction cost management based on analysis of the type of project construction costs, and further proposed the weak project construction cost management measures.

  6. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  7. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  8. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  9. Drought risk management in Mediterranean river basins.

    Science.gov (United States)

    Iglesias, Ana; Garrote, Luis; Martín-Carrasco, Francisco

    2009-01-01

    The Mediterranean region has an extensive hydraulic infrastructure and complex socioeconomic interactions among water users. In this region, competition for water among urban, agricultural, industrial, and environmental demands is strongest in times of water scarcity. Allocation of scarce water in the face of multiple demands is a challenging task that requires careful analysis. Precipitation decreases may likely be translated into drought periods in most cases. Nevertheless water scarcity (the shortage of water resources to serve water demands) not only depends on drought or precipitation deficits but also on water management. Adaptation options depend on the strategic contingency planning and management decisions that affect water resources systems. The risk management of water scarcity and drought depends on the level of water scarcity. Therefore, an adequate diagnosis of the water scarcity level is essential to anticipate the possible solutions. This study proposes a methodology for drought risk management based on the evaluation of 4 indicators of water scarcity to be used to define the thresholds of risk management actions. Based on the definition of thresholds, the study proposes the implementation of risk management actions that may be used for responding to each water scarcity situation.

  10. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  11. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  12. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  13. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  14. Implementation of project management in IT company

    OpenAIRE

    Kříž, Lubomír

    2008-01-01

    This thesis deals with the implementation of project management in an IT company from the sector of Small and Medium Enterprise. Its goal is to prepare the project management framework based on the robust methodics PMBoK, by which the company can begin to perform its business cases by using projects. The minor goals are the clear definition of project management and the summary of PMBoK and its features customized for the SME sector. This thesis consists of three parts: first one defines the ...

  15. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth;

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares...... the institutional set-up, the public participation and the potentials and barriers for implementing the water plans....

  16. Challenges of linking scientific knowledge to river basin management policy: AquaTerra as a case study

    NARCIS (Netherlands)

    Slob, A.; Rijnveld, M.

    2007-01-01

    The EU Project AquaTerra generates knowledge about the river-soil-sediment-groundwater system and delivers scientific information of value for river basin management. In this article, the use and ignorance of scientific knowledge in decision making is explored by a theoretical review. We elaborate o

  17. The Fast Forward MBA in Project Management

    CERN Document Server

    Verzuh, Eric

    2011-01-01

    An updated and revised edition of the bestselling guide to managing projects For any professional responsible for coordinating projects among different departments, across executive levels, or with technical complexity, The Fast Forward MBA in Project Management offers comprehensive instruction on how to deliver on time and on budget. Get the step-by-step advice you need to find the right sponsor, clarify objectives, and set realistic schedules and budget projections. This Fourth Edition of the 200,000-copy bestseller now covers critical new topics including: software and IT projects, agile te

  18. Making Things Happen Mastering Project Management

    CERN Document Server

    Berkun, Scott

    2008-01-01

    In the updated edition of this critically acclaimed and bestselling book, Microsoft insider Scott Berkun offers a collection of essays on field-tested philosophies and strategies for defining, leading, and managing projects. Based on his nine years of experience as a program manager for Microsoft's biggest projects, Berkun explains to technical and non-technical readers alike what it takes to get through a large software or web development project.

  19. Integrated water resources assessment and management in the Kharaa River Basin, Mongolia

    Science.gov (United States)

    Ibisch, Ralf; Karthe, Daniel; Hofmann, Jürgen; Borchardt, Dietrich

    2016-04-01

    A comprehensive study on hydrology, hydro-morphology, climatology, water physico-chemistry and ecology was conducted in the Kharaa River Basin (Mongolia) between 2006 and 2013. The assessment provided a detailed characterization of water resources for the first time and serves as a scientific basis to develop an integrated water resources management (IWRM) in the region. Following European water management approaches we identified "water bodies" as the smallest management sub-unit within the river basin, based on characteristic abiotic and biocenotic features. Four clearly identifiable water bodies in the Kharaa River main channel and seven water bodies in the tributaries were delineated. In order to achieve a good ecological status of the surface water bodies, type-specific undisturbed reference states of various aquatic ecosystems were identified and current deviations thereof were assessed. Based on the assessment a set of water management measures was developed. With regards to water quality and quantity, the upper reaches of the Kharaa River basin were classified as having a "good" ecological and chemical status. Compared to these natural reference conditions in the upper reaches, the initial risk assessment identified several "hot spot" regions with impacted water bodies in the middle and lower basin. Therefore, the affected water bodies are at risk of not achieving the good ecological and/or chemical status for surface waters. The use of natural references conditions offers a sound scientific base to assess the impact of anthropogenic activities across the Kharaa River basin. Based on the scientific results and practical experiences from a seven-year project in the region, the potentials and limitations of IWRM implementation will be discussed in the presentation.

  20. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  1. Great Basin paleoenvironmental studies project; Technical progress report: First quarter (January--August 1993)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project.

  2. Project ManagerManagement Competency’ vs. ‘Technical Competency’. Which is more important to overall project management success?

    OpenAIRE

    Barry Jon Bauer; Richardson, Tracey M

    2014-01-01

    Project managers apply multiple skills and competencies in the course of successfully delivering projects. Management and technical competencies represent two major competency categories associated with project management. In this study, the relationship between management and technical competency was investigated and a weak, yet positive correlation was observed as an outcome of this quantitative study.

  3. Breckinridge Project, initial effort. Report VI. Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  4. California Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project--shallow aquifer assessment

    Science.gov (United States)

    ,

    2013-01-01

    The California State Water Resources Control Board’s (SWRCB) GAMA Program is a comprehensive assessment of statewide groundwater quality in California. From 2004 to 2012, the GAMA Program’s Priority Basin Project focused on assessing groundwater resources used for public drinking-water supplies. More than 2,000 public-supply wells were sampled by U.S. Geological Survey (USGS) for this effort. Starting in 2012, the GAMA Priority Basin Project began an assessment of water resources in shallow aquifers in California. These shallow aquifers provide water for domestic and small community-supply wells, which are often drilled to shallower depths in the groundwater system than public-supply wells. Shallow aquifers are of interest because shallow groundwater may respond more quickly and be more susceptible to contamination from human activities at the land surface, than the deeper aquifers. The SWRCB’s GAMA Program was developed in response to the Groundwater Quality Monitoring Act of 2001 (Water Code sections 10780-10782.3): a public mandate to assess and monitor the quality of groundwater resources used for drinking-water supplies, and to increase the availability of information about groundwater quality to the public. The U.S. Geological Survey is the technical lead of the Priority Basin Project. Stewardship of California’s groundwater resources is a responsibility shared between well owners, communities, and the State. Participants and collaborators in the GAMA Program include Regional Water Quality Control Boards, Department of Water Resources, Department of Public Health, local and regional groundwater management entities, county and local water agencies, community groups, and private citizens. Well-owner participation in the GAMA Program is entirely voluntary.

  5. Project W-443 cask/transporation project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Byrd, L.C., Westinghouse Hanford

    1996-07-02

    This document has been prepared and is being released for Project W-443 participants to use in the performance of project activities. This PMP establishes the organizational responsibilities and baseline controls to be used to manage Spent Nuclear Fuel Subproject W-443.

  6. Framework for managing uncertainty in property projects

    NARCIS (Netherlands)

    Reymen, Isabelle M.M.J.; Dewulf, Geert P.M.R.; Blokpoel, Sjoerd B.

    2008-01-01

    A primary task of property development (or real estate development, RED) is making assessments and managing risks and uncertainties. Property managers cope with a wide range of uncertainties, particularly in the early project phases. Although the existing literature addresses the management of calcu

  7. Integrated Modeling and Decision-Support System for Water Management in the Puget Sound Basin: Snow Caps to White Caps

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Yang, Zhaoqing [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Voisin, Nathalie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Richey, Jeff [Univ. of Washington, Seattle, WA (United States); Wang, Taiping [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Taira, Randal Y. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Constans, Michael [Univ. of Washington, Seattle, WA (United States); Wigmosta, Mark S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Van Cleve, Frances B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tesfa, Teklu K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-01

    Final Report for the EPA-sponsored project Snow Caps to White Caps that provides data products and insight for water resource managers to support their predictions and management actions to address future changes in water resources (fresh and marine) in the Puget Sound basin. This report details the efforts of a team of scientists and engineers from Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) to examine the movement of water in the Snohomish Basin, within the watershed and the estuary, under present and future conditions, using a set of linked numerical models.

  8. Integrated Modeling and Decision-Support System for Water Management in the Puget Sound Basin: Snow Caps to White Caps

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E.; Yang, Zhaoqing; Voisin, Nathalie; Richey, Jeff; Wang, Taiping; Taira, Randal Y.; Constans, Michael; Wigmosta, Mark S.; Van Cleve, Frances B.; Tesfa, Teklu K.

    2013-12-31

    Final Report for the EPA-sponsored project Snow Caps to White Caps that provides data products and insight for water resource managers to support their predictions and management actions to address future changes in water resources (fresh and marine) in the Puget Sound basin. This report details the efforts of a team of scientists and engineers from Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) to examine the movement of water in the Snohomish Basin, within the watershed and the estuary, under present and future conditions, using a set of linked numerical models.

  9. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  10. Project management as a breakthrough at CERN

    CERN Document Server

    Ninin, P

    1998-01-01

    Building and maintaining control systems for high-energy physics is becoming an increasingly complex and costly activity. The quickly evolving technology and the tight budget conditions require today a better management of our engineering activities. This situation led us to organize these activities as "projects" and to use modern project management practices already widely spread in industry. In this context, many aspects of the re-engineering of the controls infrastructure of the two CERN largest particle accelerators - SPS and LEP - as well as the supervision of the CERN wide technical services are fully conducted as projects with special control over the costs, resources, objectives, activities and maintenance aspects. This paper presents our experience in project-based management with special emphasis on its applicability in a research environment, the impact on the current working practices, and the potential benefits for the future. Some key concepts and techniques of project management are introduced...

  11. Project management as a breakthrough at CERN

    CERN Document Server

    Van den Eynden, M

    1997-01-01

    Building and maintaining control systems for high energy physics is becoming an increasingly complex and costly activity. The quickly evolving technology and the tight budget conditions require today a better management of our engineering activities. This situation led us to organise these activities as "projects" and to use modern project management practices already widely spread in industry. In this context, many aspects of the re-engineering of the controls infrastructure of the two CERN largest particle accelerators - SPS and LEP - as well as the supervision of the CERN wide technical services are fully conducted as projects with special control over the costs, resources, objectives, activities and maintenance aspects. This paper presents our experience in project-based management with special emphasis on its applicability in a research environment, on the impact on the current working pratices and on the potential benefits for the future. Some key concepts and techniques of project management are introd...

  12. CONCEPTUALIZATION OF THE INTERVENTION EDUCATIONAL PROJECTS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Codruta Dana DUDĂ-DĂIANU

    2016-02-01

    Full Text Available This paper offers the conceptual landmarks of the intervention educational projects’ management, the structural and conceptual features of the intervention educational projects, which have remained common with the ones of the social domain. Also, the monitoring of the project implementation is approached, emphasizing the role of the objectives as a defining managerial leverage, but also some guiding aspects wedded to the monitoring of the project, with relevant curricular applications. The competences of the project manager, demanded by the educational market, are presented, and the role of the team activity in the management of the educational projects and, finally, the contributions of the partnership in the intervention educational project’ management are analytically exposed.

  13. Uncertainty in flow and sediment projections due to future climate scenarios for the 3S Rivers in the Mekong Basin

    Science.gov (United States)

    Shrestha, Bikesh; Cochrane, Thomas A.; Caruso, Brian S.; Arias, Mauricio E.; Piman, Thanapon

    2016-09-01

    Reliable projections of discharge and sediment are essential for future water and sediment management plans under climate change, but these are subject to numerous uncertainties. This study assessed the uncertainty in flow and sediment projections using the Soil and Water Assessment Tool (SWAT) associated with three Global Climate Models (GCMs), three Representative Concentration Pathways (RCPs) and three model parameter (MP) sets for the 3S Rivers in the Mekong River Basin. The uncertainty was analyzed for the short term future (2021-2040 or 2030s) and long term future (2051-2070 or 2060s) time horizons. Results show that dominant sources of uncertainty in flow and sediment constituents vary spatially across the 3S basin. For peak flow, peak sediment, and wet seasonal flows projection, the greatest uncertainty sources also vary with time horizon. For 95% low flows and for seasonal and annual flow projections, GCM and MP were the major sources of uncertainty, whereas RCPs had less of an effect. The uncertainty due to RCPs is large for annual sediment load projections. While model parameterization is the major source of uncertainty in the short term (2030s), GCMs and RCPs are the major contributors to uncertainty in flow and sediment projections in the longer term (2060s). Overall, the uncertainty in sediment load projections is larger than the uncertainty in flow projections. In general, our results suggest the need to investigate the major contributing sources of uncertainty in large basins temporally and at different scales, as this can have major consequences for water and sediment management decisions. Further, since model parameterization uncertainty can play a significant role for flow and sediment projections, there is a need to incorporate hydrological model parameter uncertainty in climate change studies and efforts to reduce the parameter uncertainty as much as possible should be considered through a careful calibration and validation process.

  14. Hazardous waste management in the Pacific basin

    Energy Technology Data Exchange (ETDEWEB)

    Cirillo, R.R.; Chiu, S.; Chun, K.C.; Conzelmann, G. [Argonne National Lab., IL (United States); Carpenter, R.A.; Indriyanto, S.H. [East-West Center, Honolulu, HI (United States)

    1994-11-01

    Hazardous waste control activities in Asia and the Pacific have been reviewed. The review includes China (mainland, Hong Kong, and Taiwan), Indonesia, Korea, Malaysia, Papua New Guinea, the Philippines, Singapore, and Thailand. It covers the sources of hazardous waste, the government structure for dealing with hazardous waste, and current hazardous waste control activities in each country. In addition, the hazardous waste program activities of US government agencies, US private-sector organizations, and international organizations are reviewed. The objective of these reviews is to provide a comprehensive picture of the current hazardous waste problems and the waste management approaches being used to address them so that new program activities can be designed more efficiently.

  15. A Communications Approach to Teaching Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2012-01-01

    This chapter presents a communications approach to teaching project management analyzed from a Design Science Research perspective. Using a combination of product and process, as well as three inter-related Design Science Research Cycles—relevance, design and rigor—the Project Management Course...... in the Bachelor of Marketing and Management Communication at Aarhus University is examined and analyzed. The presence of the three Design Science Research Cycles combined with both process and product, highlights the critical role of communication in both understanding Project Management and applying Design...... to both frame the learners’ audience for Project Management Writing assignments, and to provide a concrete organizational context to aid in communication practices such as stakeholder analysis, and the development of a critical internal monitor for quality in the learner’s mind. The relevance of Design...

  16. How different institutional arrangements promote integrated river basin management

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Frederiksen, Pia; Saarikoski, Heli;

    2013-01-01

    Management Planning processes in six countries around the Baltic Sea. We use theories on multi-level governance, regime interplay and institutional effectiveness. We find that, in most cases, central governments have played a dominant role in the formulation of river basin management plans, while local...... influence has been somewhat limited. The tight procedural deadlines of the di-rective appear to have pushed for more centralisation than originally intended by the countries. But the analysis also shows that interplay mechanisms such as norms, ideas and incentives do promote effective institutional...

  17. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  18. The Indus basin in the framework of current and future water resources management

    Science.gov (United States)

    Laghari, A. N.; Vanham, D.; Rauch, W.

    2012-04-01

    The Indus basin is one of the regions in the world that is faced with major challenges for its water sector, due to population growth, rapid urbanisation and industrialisation, environmental degradation, unregulated utilization of the resources, inefficient water use and poverty, all aggravated by climate change. The Indus Basin is shared by 4 countries - Pakistan, India, Afghanistan and China. With a current population of 237 million people which is projected to increase to 319 million in 2025 and 383 million in 2050, already today water resources are abstracted almost entirely (more than 95% for irrigation). Climate change will result in increased water availability in the short term. However in the long term water availability will decrease. Some current aspects in the basin need to be re-evaluated. During the past decades water abstractions - and especially groundwater extractions - have augmented continuously to support a rice-wheat system where rice is grown during the kharif (wet, summer) season (as well as sugar cane, cotton, maize and other crops) and wheat during the rabi (dry, winter) season. However, the sustainability of this system in its current form is questionable. Additional water for domestic and industrial purposes is required for the future and should be made available by a reduction in irrigation requirements. This paper gives a comprehensive listing and description of available options for current and future sustainable water resources management (WRM) within the basin. Sustainable WRM practices include both water supply management and water demand management options. Water supply management options include: (1) reservoir management as the basin is characterised by a strong seasonal behaviour in water availability (monsoon and meltwater) and water demands; (2) water quality conservation and investment in wastewater infrastructure; (3) the use of alternative water resources like the recycling of wastewater and desalination; (4) land use

  19. The Indus basin in the framework of current and future water resources management

    Directory of Open Access Journals (Sweden)

    A. N. Laghari

    2012-04-01

    Full Text Available The Indus basin is one of the regions in the world that is faced with major challenges for its water sector, due to population growth, rapid urbanisation and industrialisation, environmental degradation, unregulated utilization of the resources, inefficient water use and poverty, all aggravated by climate change. The Indus Basin is shared by 4 countries – Pakistan, India, Afghanistan and China. With a current population of 237 million people which is projected to increase to 319 million in 2025 and 383 million in 2050, already today water resources are abstracted almost entirely (more than 95% for irrigation. Climate change will result in increased water availability in the short term. However in the long term water availability will decrease. Some current aspects in the basin need to be re-evaluated. During the past decades water abstractions – and especially groundwater extractions – have augmented continuously to support a rice-wheat system where rice is grown during the kharif (wet, summer season (as well as sugar cane, cotton, maize and other crops and wheat during the rabi (dry, winter season. However, the sustainability of this system in its current form is questionable. Additional water for domestic and industrial purposes is required for the future and should be made available by a reduction in irrigation requirements. This paper gives a comprehensive listing and description of available options for current and future sustainable water resources management (WRM within the basin. Sustainable WRM practices include both water supply management and water demand management options. Water supply management options include: (1 reservoir management as the basin is characterised by a strong seasonal behaviour in water availability (monsoon and meltwater and water demands; (2 water quality conservation and investment in wastewater infrastructure; (3 the use of alternative water resources like the recycling of wastewater and desalination; (4

  20. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  1. Strategic Leadership of Portfolio and Project Management

    CERN Document Server

    Kloppenborg, Timothy J

    2012-01-01

    As an executive in today's economy, your organization may have limited resources and bench strength. How can you and other leaders make the most of your company's assets? This book will instruct you and your leadership teams on implementing strategy through identifying, selecting, prioritizing, resourcing, and governing an optimal combination of projects and other work. Inside, you'll learn how to sponsor every project stage, as well as instruct your project managers and direct reports to follow your lead. Detailed advice is given for project management competency on utilizing input from custo

  2. Managing water resources for sustainable development: the case of integrated river basin management in China.

    Science.gov (United States)

    Song, X; Ravesteijn, W; Frostell, B; Wennersten, R

    2010-01-01

    The emerging water crisis in China shows that the current institutional frameworks and policies with regard to water resources management are incapable of achieving an effective and satisfactory situation that includes Integrated River Basin Management (IRBM). This paper analyses this framework and related policies, examines their deficiencies in relation to all water stress problems and explores alternatives focusing on river basins. Water resources management reforms in modern China are reviewed and the main problems involved in transforming the current river management system into an IRBM-based system are analysed. The Huai River basin is used as an example of current river basin management, with quantitative data serving to show the scale and scope of the problems in the country as a whole. The institutional reforms required are discussed and a conceptual institutional framework is proposed to facilitate the implementation of IRBM in China. In particular, the roles, power and responsibilities of River Basin Commissions (RBCs) should be legally strengthened; the functions of supervising, decision-making and execution should be separated; and cross-sectoral legislation, institutional coordination and public participation at all levels should be promoted.

  3. Watershed-scale evaluation of the Water Erosion Prediction Project (WEPP) model in the Lake Tahoe basin

    Science.gov (United States)

    Brooks, Erin S.; Dobre, Mariana; Elliot, William J.; Wu, Joan Q.; Boll, Jan

    2016-02-01

    Forest managers need methods to evaluate the impacts of management at the watershed scale. The Water Erosion Prediction Project (WEPP) has the ability to model disturbed forested hillslopes, but has difficulty addressing some of the critical processes that are important at a watershed scale, including baseflow and water yield. In order to apply WEPP to forested watersheds, we developed and assessed new approaches for simulating streamflow and sediment transport from large watersheds using WEPP. We created specific algorithms to spatially distribute soil, climate, and management input files for all the subwatersheds within the basin. The model enhancements were tested on five geologically and climatically diverse watersheds in the Lake Tahoe basin, USA. The model was run with minimal calibration to assess WEPP's ability as a physically-based model to predict streamflow and sediment delivery. The performance of the model was examined against 17 years of observed snow water equivalent depth, streamflow, and sediment load data. Only region-wide baseflow recession parameters related to the geology of the basin were calibrated with observed streamflow data. Close agreement between simulated and observed snow water equivalent, streamflow, and the distribution of fine (20 μm) sediments was achieved at each of the major watersheds located in the high-precipitation regions of the basin. Sediment load was adequately simulated in the drier watersheds; however, annual streamflow was overestimated. With the exception of the drier eastern region, the model demonstrated no loss in accuracy when applied without calibration to multiple watersheds across Lake Tahoe basin demonstrating the utility of the model as a management tool in gauged and ungauged basins.

  4. Risk management methodology for RBMN project

    Energy Technology Data Exchange (ETDEWEB)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George, E-mail: fborssatto@gmail.com, E-mail: tellocc@cdtn.br, E-mail: george@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2013-07-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  5. Comparison of project management approaches in construction

    Institute of Scientific and Technical Information of China (English)

    李百毅; 郑敏; 李百战; AUSTIN; S; THORPE; T

    2009-01-01

    The construction industry is acutely aware of the need to improve its management process. Currently,construction management is facing four major schools of thoughts. This paper reports the recent study results,the aim of which was to compare these approaches. The focus will be on the questions:What is the theory root for this school of thoughts? What is the position of planning? What are the techniques used or recommended by each of these schools of thoughts in managing construction projects? Recommendations are then given through a deep discussion of the capability of each approach in managing today’s highly complex construction project.

  6. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  7. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  8. Ground Enterprise Management System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Emergent Space Technologies Inc. proposes to develop the Ground Enterprise Management System (GEMS) for spacecraft ground systems. GEMS will provide situational...

  9. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  10. Development of indicators for assessment of Lake Malawi Basin in an Integrated Lake Basin Management (ILBM framework

    Directory of Open Access Journals (Sweden)

    Clara Limbitso Chidammodzi

    2015-03-01

    Full Text Available This paper sought to understand the current state of the management environment of Lake Malawi Basin, deduce a lake vision and develop indicators for assessing Integrated Lake Basin Management (ILBM in the lake basin. The premise of the study was that targeted indicators are necessary to effectively monitor the lake basin and manage it sustainably. The study focused on the Malawian side of the lake. Interviews, field observations and review of existing lake management and indicator development approaches around the world were the methods employed. It was found that Malawi lacks focus on lakes in its strategies and the existing management of the lake is on a sector-to-sector basis with little coordination. Furthermore, the capacity of lake-related sector institutions is hampered by inadequate resources and unstable flow of funds. It was concluded that the current management of the lake basin is unsustainable and there is need to comprehensively monitor the lake basin as well as formulate and implement management plans and strategies that are based on the knowledge obtained from targeted monitoring. A set of governance indicators was developed taking into account the characteristics of the lake, the values that it offers and the threats that it is facing.

  11. Klamath Basin Restoration Agreement Off-Project Water Program Sub-basin Analysis Pour Points v3

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  12. OVERVIEW OF THE MARK TWAIN LAKE/SALT RIVER BASIN CONSERVATION EFFECTS ASSESSMENT PROJECT

    Science.gov (United States)

    The Mark Twain Lake/Salt River Basin was selected as one of 12 USDA-Agricultural Research Service benchmark watersheds for the Conservation Effects Assessment Project (CEAP) because of documented soil and water quality problems and broad stakeholder interest. The basin is located in northeastern Mis...

  13. K Basin Sandfilter Backwash Line Characterization Project and Analytical Results for Campaign 24

    Energy Technology Data Exchange (ETDEWEB)

    STEEN, F.H.

    1999-12-08

    Sample 203KWBMF was taken from the K West Sandfilter Backwash Pit on November 4, 1999 and received by 2224 Laboratory on November 4, 1999. Analyses were performed on sample 203KWBMF in accordance with ''Letter of Instruction for K Basins sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project.

  14. K Basin sandfilter backwash line characterization project, analytical results for Campaign 20

    Energy Technology Data Exchange (ETDEWEB)

    STEEN, F.H.

    1999-08-12

    Sample 112KWBMF was taken from the K West Sandfilter Backwash Pit on June 1, 1999, and received by 222-S Laboratory on June 2,1999. Analyses were performed on sample 112KWBMF in accordance with Letter of Instruction for K Basins Sandfilter Backwash Line Samples (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project.

  15. K Basin Sandfilter Backwash Line Characterization Project Analytical Results for Campaign 25

    Energy Technology Data Exchange (ETDEWEB)

    STEEN, F.H.

    2000-03-22

    Sample 023KWBMF was taken from the K West Sandfilter Backwash Pit on February 10, 2000 and received by 222-S Laboratory on February 11, 2000. Analyses were performed on sample 023KWBMF in accordance with ''Letter of Instruction for K Basins Sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project.

  16. Computer Technology in Construction Project Management

    Institute of Scientific and Technical Information of China (English)

    Zhang Zhi

    2014-01-01

    Today, the network information has become a trend al of the industries have to face. For the construction project management, we must fuly master the use of computer information technology, mining its intrinsic value, so that it can promote the construction industry to meet the requirements of the times. This paper demonstrates the main application of computer technology in construction project management in a brief analysis.

  17. Information Technology in Engineering and Project Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2017-01-01

    Full Text Available Information Technology (IT can be regarded as the use of computers to store, analyze, and manipulate data (Daintith, 2009. With the rapid development of personal computers, IT has been widely applied in nearly every field (Davenport, 2013. This issue presents five papers covering engineering and project management, three of which focus on the application of IT to solve engineering and project management issues, while one presents research into public private partnerships, and another into cash flow forecasting.

  18. The Agile Project Management Mapping Research

    OpenAIRE

    Fang, Aiwen

    2015-01-01

    Purpose: This dissertation reviews the agile project management (APM) related literatures to identify its academic current scenarios. Furthermore, this dissertation also discovers the future research directions of agile project management, especially its application in non-software related industries. Methodology: The literature was planned to be collected through selecting from the journals have 2 to 4* rating in the Association of Business School’s Academic Journal Guide 2015. The appl...

  19. An essay on agile project management practices

    OpenAIRE

    Gouveia, Daniel Rabasquinho

    2015-01-01

    The main goals for the current dissertation is to research on how practices and concepts from Agile Project Management can be applied in a non-IT context and to discover which aspects should be considered when deciding if whether an Agile approach should be implemented or not. Previous studies reflect on the adoption for the identified context. However, the recognition of these practices and concepts by the Project Management field of studies still remains unresolved. The adoption of Agile...

  20. Managing Projects with CSR in mind

    DEFF Research Database (Denmark)

    Kampf, Constance; Thomsen, Christa

    2008-01-01

    This paper examines project management as a place where CSR can be operationalized, focusing particularly on project conception processes and co-constructing CSR knowledge with emergent tertiary stakeholders. Two projects which dealt with emergent tertiary stakeholders differently are examined.......  First, the Finnish company Metsa-Botnia's paper pulp plant in Uruguay is examined as a project in which a tertiary stakeholder, Argentina, emerged during the early stages of the project.  Argentina requested dialogue about the project conception and Metsa Botnia did not include them.  In contrast......, the Danish emergency services company Falck A/S's project on redefining CSR is offered as an example of a project transformed through dialogue with the emergent tertiary stakeholder, the county of Aarhus.   To analyze the cases, the paper combines Morsing & Schultz's (2006) dialectic CSR strategy based...

  1. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  2. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  3. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  4. 75 FR 8395 - Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside...

    Science.gov (United States)

    2010-02-24

    ... Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and.../EIR for the proposed Riverside-Corona Feeder Project. The public and agencies are invited to comment..., and construction of the Riverside-Corona Feeder Project including: (i) 20 groundwater wells;...

  5. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  6. The impact of sustainability on project management

    NARCIS (Netherlands)

    Silvius, Gilbert; Brink, Jasper van den; Köhler, Adri

    2011-01-01

    Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management. Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of sustainability in t

  7. The impact of sustainability on project management

    NARCIS (Netherlands)

    Silvius, Gilbert; Brink, Jasper van den; Köhler, Adri

    2012-01-01

    Full text via link Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of s

  8. Management of Innovative Projects through Agile Technology

    Directory of Open Access Journals (Sweden)

    Radu Bucea-Manea-Tonis

    2014-09-01

    Full Text Available Because of the globalization and the evolution of internet and technologies, nowadays the innovation is associated with open collaboration conducted by a legal framework. The paper analyses the methods that allow a better management for innovative projects and focuses on agile projects within a technological network.

  9. Waste management project technical baseline description

    Energy Technology Data Exchange (ETDEWEB)

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  10. Graduate Student Project: Employer Operations Management Analysis

    Science.gov (United States)

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  11. Results of Mitigation Meeting on June 10, 1980 : Closed Basin Division, San Luis Valley Project, Colorado

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Results of a meeting regarding mitigation on the Closed Basin Division project written by David Coleman. Water and Power Resource Service, U.S. Geological Survey and...

  12. Results of alternatives negotiations of November 7, Closed Basin Division, San Luis Valley Project, Colorado

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Summary of discussions and agreements as well as a trascription of the November 7th, 1978 meeting pertaining to the planning for the Closed Basin Division Project.

  13. [Draft] Environmental Impact Statement : San Luis Valley Project : Colorado Closed Basin Division

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Closed Basin Division, San Luis Valley Project, Alamosa and Saguache Counties, Colorado, is a multi-purpose water resource plan designated to salvage and deliver...

  14. SEDIMENT MANAGEMENT IN HYDROELECTRIC PROJECTS

    Institute of Scientific and Technical Information of China (English)

    K.G.RANGA RAJU; U.C.KOTHYARI

    2005-01-01

    Withdrawal of water from a river into a canal involves the construction of a barrage or a dam across the river depending on whether the river is perennial or not. The design of the reservoir upstream of the dam and of the canal requires consideration of the sediment load carried by the river in case the river is sediment-laden. The basic equations concerning morphological changes in such rivers are discussed with particular reference to computation of reservoir sedimentation. The hydraulics of lined canals carrying wash load is examined from the point of view of limiting transport capacity and changes in frictional resistance. Lastly,the methods of design of sediment extraction devices like settling basins and vortex chambers are presented.

  15. River Basin Information System: Open Environmental Data Management for Research and Decision Making

    Directory of Open Access Journals (Sweden)

    Franziska Zander

    2016-07-01

    Full Text Available An open, standardized data management and related service infrastructure is a crucial requirement for a seamless storage and exchange of data and information within research projects, for the dissemination of project results and for their application in decision making processes. However, typical project databases often refer to only one research project and are limited to specific purposes. Once implemented, those systems are often not further maintained and updated, rendering the stored information useless once the system stops operating. The River Basin Information System (RBIS presented here is designed to fit not only the requirements of one research project, but focuses on generic functions, extensibility and standards compliance typically found in interdisciplinary environmental research. Developed throughout more than 10 years of research cooperation worldwide, RBIS is designed to manage different types of environmental data with and without spatial context together with a rich set of metadata. Beside data management and storage, RBIS provides functions for the visualization, linking, analysis and processing of different types of data to support research, decision making, result dissemination and information discovery for all kinds of users. The focus of this paper is on the description of the technical implementation and the presentation of functions. This will be complemented by an overview of example applications and experiences during RBIS development and operation.

  16. Low flows and reservoir management for the Durance River basin (Southern France) in the 2050s

    Science.gov (United States)

    Sauquet, Eric

    2015-04-01

    The Durance River is one of the major rivers located in the Southern part of France. Water resources are under high pressure due to significant water abstractions for human uses within and out of the natural boundaries of the river basin through an extended open channel network. Water demands are related to irrigation, hydropower, drinking water, industries and more recently water management has included water needs for recreational uses as well as for preserving ecological services. Water is crucial for all these activities and for the socio-economic development of South Eastern France. Both socio-economic development and population evolution will probably modify needs for water supply, irrigation, energy consumption, tourism, industry, etc. In addition the Durance river basin will have to face climate change and its impact on water availability that may question the sustainability of the current rules for water allocation. The research project R²D²-2050 "Risk, water Resources and sustainable Development within the Durance river basin in 2050" aims at assessing future water availability and risks of water shortage in the 2050s by taking into account changes in both climate and water management. R²D²-2050 is partially funded by the French Ministry in charge of Ecology and the Rhône-Méditerranée Water Agency. This multidisciplinary project (2010-2014) involves Irstea, Electricité de France (EDF), the University Pierre et Marie Curie (Paris), LTHE (CNRS), the Société du Canal de Provence (SCP) and the research and consultancy company ACTeon. A set of models have been developed to simulate climate at regional scale (given by 330 projections obtained by applying three downscaling methods), water resources (provided by seven rainfall-runoff models forced by a subset of 330 climate projections), water demand for agriculture and drinking water, for different sub basins of the Durance River basin upstream of Mallemort under present day and under future conditions

  17. Towards an optimal integrated reservoir system management for the Awash River Basin, Ethiopia

    Science.gov (United States)

    Müller, Ruben; Gebretsadik, Henok Y.; Schütze, Niels

    2016-05-01

    Recently, the Kessem-Tendaho project is completed to bring about socioeconomic development and growth in the Awash River Basin, Ethiopia. To support reservoir Koka, two new reservoirs where built together with extensive infrastructure for new irrigation projects. For best possible socioeconomic benefits under conflicting management goals, like energy production at three hydropower stations and basin wide water supply at various sites, an integrated reservoir system management is required. To satisfy the multi-purpose nature of the reservoir system, multi-objective parameterization-simulation-optimization model is applied. Different Pareto-optimal trade-off solutions between water supply and hydro-power generation are provided for two scenarios (i) recent conditions and (ii) future planned increases for Tendaho and Upper Awash Irrigation projects. Reservoir performance is further assessed under (i) rule curves with a high degree of freedom - this allows for best performance, but may result in rules curves to variable for real word operation and (ii) smooth rule curves, obtained by artificial neuronal networks. The results show no performance penalty for smooth rule curves under future conditions but a notable penalty under recent conditions.

  18. Stakeholder views on flood risk management in Hungary's Upper Tisza Basin.

    Science.gov (United States)

    Vari, Anna; Linnerooth-Bayer, Joanne; Ferencz, Zoltan

    2003-06-01

    With escalating costs of flood mitigation and relief, a challenge for the Hungarian government is to develop a flood mitigation and insurance/relief system that is viewed as efficient and fair by the many stakeholders involved. To aid policymakers in this task, this article reports on a recent study to elicit stakeholder views on flood risk management in the Upper Tisza Basin, including views on appropriate means of reducing losses and for transferring the residual losses from the direct victims to taxpayers or an insurance pool. This study is part of a project to develop an integrated approach to flood risk management coordinated by the International Institute of Applied Systems Analysis (IIASA) in collaboration with Swedish and Hungarian researchers. The discussion begins by describing the background of flood risk management problems in the Upper Tisza Basin. The results of interviews carried out with selected key stakeholders and the results of a public survey eliciting views on flood risk management are reported. The final section draws conclusions on incorporating stakeholder views into a flood risk management model, which will be used to illustrate policy paths at an upcoming stakeholder workshop. The conclusions are also of direct interest to Hungarian policymakers.

  19. Adopting SCRUM Agile Project Management for Managing Academic Institutions

    Directory of Open Access Journals (Sweden)

    Abdullah Basahel

    2015-01-01

    Full Text Available Managing academic institutions can be challenging and different than managing other organizations. This is because the staffs are highly qualified and may even be at the same and sometimes even higher academic level than their managers. An autocratic style of leadership may lead to tensions and be problematic for the organization. Therefore, a more democratic approach is required. SCRUM is an agile project management method, mainly used in IT domain. SCRUM teams have no manager and rely on the team to control its members. This paper will attempt to illustrate, how the SCRUM methodology can be used to manage an academic institution.

  20. Integrated Structural Health Management Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) proposes to advance the state of the art in composite health management through refinement of an existing technology developed...

  1. Spent Nuclear Fuel Project Document Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  2. Stop IT Project Failures Through Risk Management

    CERN Document Server

    Remenyi, D

    1999-01-01

    This book is about information systems development failures and how to avoid them. .It considers what goes wrong with information systems development projects and what actions may be taken to avoid potential difficulties.The reduction of the impact,or even the elimination of the problems,is discussed in terms of an information systems risk management programme. Stop I.T.Project failure helps to ensure that IS project managers are successful in helping to deliver application systems. However, IS development risk can never be entirely eliminated and consequently the practitioner needs to bear in

  3. Project Management for Engineering, Business, and Technology

    CERN Document Server

    Nicholas, John M

    2012-01-01

    There is an ever-growing need for better project management within the disciplines of engineering, business and technology and this new edition is a direct response to that need. By emphasizing practical applications, this book targets the ultimate purpose of project management; to unify and integrate the interests, resources and work efforts of many stakeholders to accomplish the overall project goal. The book encompasses the essential background material, from philosophy to methodology, that is required, before dedicating itself to presenting concepts and techniques of practical application

  4. The ComSoc guide to managing telecommunications projects

    CERN Document Server

    Desmond, Celia

    2010-01-01

    "This pocket guide provides an overview of the telecommunications environment as it has evolved over the past few years, illustrating the need for project management, the significance of project success to the companies, and the application of key project management processes within the telecom environment. Topics covered include: scope management, time management, cost management, procurement management, risk management, communications, quality, human resources, and Integration. It offers professionals a brief and accessible guide to managing telecommunication projects in the 21st century"--

  5. Boundaries of Consent: Stakeholder Representation in River Basin Management in Mexico and South Africa

    NARCIS (Netherlands)

    Wester, P.; Merrey, D.J.; Lange, M.

    2003-01-01

    Increasing the capacity of water users to influence decision-making is crucial in river basin management reforms. This article assesses emerging forums for river basin management in Mexico and South Africa and concludes that the pace of democratization of water management in both is slow. Mexico is

  6. Uncertainty of runoff projections under changing climate in Wami River sub-basin

    Directory of Open Access Journals (Sweden)

    Frank Joseph Wambura

    2015-09-01

    New Hydrological Insights for the Region: The results of projected streamflow shows that the baseline annual climatology flow (ACF is 98 m3/s and for the future, the median ACF is projected to be 81 m3/s. At 100% uncertainty of skilled projections, the ACF from the sub-basin is projected to range between −47% and +36% from the baseline ACF. However, the midstream of the sub-basin shows reliable water availability for foreseen water uses expansion up to the year 2039.

  7. Using facilitative skills in project management

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard; Hansen, Mette Sanne; Jacobsen, Peter

    2013-01-01

    managers are frequently finding themselves in situations where using facilitating skills is not an option, but a requirement. Facilitation is to be viewed as a process of ‘obstetric’ aid to meet the challenges of coping with the changing conditions for project management described briefly above...... facilitating skills are identified and discussed in relation to the changing circumstances for project management. The approach used to achieve this paper’s objective includes a literature review, model building and reflection on facilitation skills based on the author’s experiences from facilitating workshops......Project management can be seen as a profession, discipline and conceptual framework. It has been developed from different fields, including military engineering, mechanical engineering, social sciences and construction. During recent decades, there has been a number of challenges as to its efficacy...

  8. Identity and the Management Project

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg; Dehlin, Erlend

    and family resemblance. We argue that rules and family resemblance are central for the construction of identity because they are the link between individual and social realities. We use the concept of narrating to emphasize how individuals construct themselves as meaningful individuals in the world...... and family resemblance. As such, managing identity in organizations is closely linked to rules and family resemblance. Organizations manage identity through the definition of norms and values for right or wrong, appropriate or inappropriate, to name but a few. Norms and values are important as reference...... because the conditioning factors of these bonds, rules and family resemblances may be eroded by change....

  9. Estimation of efficiency project management

    Directory of Open Access Journals (Sweden)

    Novotorov Vladimir Yurevich

    2011-03-01

    Full Text Available In modern conditions, the effectiveness of the enterprises all in a greater degree depends on methods of management and business dealing forms. The organizations should choose the most effective for themselves strategy of management taking into account the existing legislation, concrete conditions of activity, financial and economic, investment potential and development strategy. Introduction of common system of planning and realization of strategy of the organization, it will allow to provide even development and long-term social and economic growth of the companies.

  10. Agile project management – a future approach to the management of projects?

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2013-05-01

    Full Text Available Like other professions, project management is constantly developing, new techniques are emerging, while newer, more effective approaches are being established. As an innovative modern approach, agile project management is most frequently mentioned and many experts argue that it is becoming the project management of the 21st century. The approach was developed in the field of software development and has delivered a number of novelties and benefits for the project team and the project client. On the other hand, it highlights some ‘new’ approaches that are not foreign to ‘traditional’ managers and raises a series of dilemmas about the actual benefits it brings. Even greater dilemmas arise when we attempt to use the approach for other types of projects. This speculative article summarises the most significant innovations introduced by the agile approach and critically assesses the possibility of extending the agile approach to other types of projects.

  11. Coupling the hydrological and ecological process to implement the sustainable water resources management in Hanjiang River Basin

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    Research on the combination of hydrological variation and ecological demands plays an important role in water availability assessment and sustainable management on basin scale. An integrative frame, consisting of hydrological regime modelling, ecological water demands estimation and renewable resources management, is given in this paper in order to support the implementation of the sustainable water resources management. The suggested integrative frame has been used to study the integrated water resources management in southern Hanjiang River Basin which is the water source of South-toNorth Water Transportation Project in China. SWAT (soil and water assessment tool) model was used to simulate the monthly averaging streamflow and the amounts of ecological water demands in stream were also estimated in order to evaluate the available water resources for the local users and the transportation project. Then we formed the developing scenarioes by coupling the available water resources, the recovering rate of water resources in natural water cycle, the local water use rate and the amounts of the water transported to North, and used the Scheafer model to analyze their evolving trajectories. Eventually, the sustainable water resources management measures were assembled by the comprehensive evaluation of the scenarioes. The research indicates that the integrative frame provided a new way for the integrated water resources management in river basin.

  12. Reducing the basin vulnerability by land management practices under past and future climate: a case study of the Nam Ou River Basin, Lao PDR

    Directory of Open Access Journals (Sweden)

    M. Maharjan

    2014-08-01

    Full Text Available This research evaluates different land management practices for the Nam Ou River Basin in Northern Laos for reducing vulnerability of the basin due to erosion and sediment yield under existing and future climate conditions. We use climate projection data (precipitation and temperature from three general circulation models (GCMs for three greenhouse gas emission scenarios (GHGES, namely B1, A1B and A2 and three future periods, namely 2011–2030, 2046–2065 and 2080–2099. These large resolution GCM data are downscaled using the Long Ashton Research Station-Weather Generator (LARS-WG. The Soil and Water Assessment Tool (SWAT, which is a process based hydrological model, is used to simulate discharge and sediment yield and a threshold value of annual sediment yield is applied to identify vulnerable sub-basins. Results show that the change in the annual precipitation is expected to be between −7.60 to 2.64% in 2011–2030, −8.98 to 11.85% in 2046–2065, and −11.04 to 25.84% in 2080–2099. In the meantime, the changes in mean monthly temperature vary from 0.3 to 1.3 °C in the 2011–2030, 1.3 to 2.9 °C in the 2046–2065 and 1.9 to 4.9 °C in the 2080–2099. Five sub-basins are identified vulnerable (critical under the current climate. Our results show that terracing is the most effective land management practice to reduce sediment yield in these sub-basins followed by strip-cropping and filter strip. Appropriate land management practices applied under future climate scenarios show significant reduction in sediment yield (i.e. up to the tolerance limit except for some sub-basins. In these exceptional sub-basins, designing an optimum combination of management practices is essential to reduce the vulnerability of the basin.

  13. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....

  14. Climate change impact on the management of water resources in the Seine River basin, France

    Science.gov (United States)

    Dorchies, David; Thirel, Guillaume; Chauveau, Mathilde; Jay-Allemand, Maxime; Perrin, Charles; Dehay, Florine

    2013-04-01

    It is today commonly accepted that adaptation strategies will be needed to cope with the hydrological consequences of projected climate change. The main objective of the IWRM-Net Climaware project is to design adaptation strategies for various socio-economic sectors and evaluate their relevance at the European scale. Within the project, the Seine case study focuses on dam management. The Seine River basin at Paris (43800km²) shows major socio-economic stakes in France. Due to its important and growing demography, the number of industries depending on water resources or located on the river sides, and the developed agricultural sector, the consequences of droughts and floods may be dramatic. To mitigate the extreme hydrological events, a system of four large multi-purpose reservoirs was built in the upstream part of the basin between 1949 and 1990. The IPCC reports indicate modifications of the climate conditions in northern France in the future. An increase of mean temperature is very likely, and the rainfall patterns could be modified: the uncertainty on future trends is still high, but summer periods could experience lower quantities of rainfall. Anticipating these changes are crucial: will the present reservoirs system be adapted to these conditions? Here we propose to evaluate the capacity of the Seine River reservoirs to withstand future projected climate conditions using the current management rules. For this study a modeling chain was designed. We used two hydrological models: GR4J, a lumped model used as a benchmark, and TGR, a semi-distributed model. TGR was tuned to explicitly account for reservoir management rules. Seven climatic models forced by the moderate A1B IPCC scenario and downscaled using a weather-type method (DSCLIM, Pagé et al., 2009), were used. A quantile-quantile type method was applied to correct bias in climate simulations. A model to mimic the way reservoirs are managed was also developed. The evolution of low flows, high flows and

  15. Project management system model development and experimental research

    OpenAIRE

    Golubeva, Viktorija

    2006-01-01

    Project management is the application of knowledge, skills, tools and techniques to project activities to meet project requirements. Project Management Information System is tightly connected with organizational structure and particularity of executed projects. However the main objective of this research was to identify project management model that would be universal, helpful and easily used with small and medium projects In analysis phase we reviewed different methodologies, project ...

  16. Scope management in web application projects

    Directory of Open Access Journals (Sweden)

    Cristina Coelho de Abreu Pinna

    2008-07-01

    Full Text Available Software projects are subjected to certain risks and uncertainties, especially those that include Web applications, due to the fact that market competition aims to have electronic and virtual services available in a shorter and shorter period of time (also known as “Internet timing”. Another critical factor relates to the focus to be adopted into the management of Web application projects – should technology or business process be emphasized? This fact produces some difficulties in the acceptance of the software by the customer. This problem could be minimized by appropriate management of the project scope from its earliest phases (conception and planning. The article will present an approach that can be utilized on the management of Web applications projects for the minimization of uncertainties and risks when defining scope. A comparative and critical analysis will be carried out among several instruments and techniques that can be utilized on the definition of scope and priorities such as: QFD, Business Process Modeling and Partitioning. Key-words: Project Management, Scope Management, Web applications, QFD.

  17. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  18. Development and evaluation of project management effectiveness

    Directory of Open Access Journals (Sweden)

    L.L. Kalinichenko

    2016-12-01

    Full Text Available The aim of the article. The author notes that by Studying the work of project management, we can say that researchers distinguish effectiveness from the standpoint of professional activities at the project and organizational and psychological climate activities. The results of the analysis. Professionally efficiency is, first and foremost, the focus of the entire team at the end result, initiative and creative approach to solving problems. From the standpoint of organizational and psychological climate effective is such a command, in which: informal atmosphere; the objective is clear and accepted; the members listen to each other; discuss the issues, involving all members; conflicts and disagreements are present but are expressed and centered around ideas and methods, not personalities; the group is aware that does, decisions are based on consensus, not on majority vote. Under these conditions, the team not only successfully fulfills its mission, but also meets the personal and interpersonal needs of their members, resulting in the output result, which has implemented project with the planned performance as a measure of team activity. Effective management of the project team depends largely on the efficiency of project management, innovation and effective use of investment. The following article in the graphic scheme of forming an effective project team gives an idea of what the process is gradual and multidimensional, requires the project manager skills to rally the team, allocate responsibilities, set goals and monitor the activities of each member of the team. Conclusions and directions of further researches. In general, the novelty of this article is that the author describes a technique that enables to assess the effectiveness of the management team working on the project, taking into account the time that is, the leaders for team building, cohesion of its members, raising the level of competence of experts. This technique is simple in

  19. CONTRIBUTIONS IN PROJECT IMPLEMENTATION MANAGEMENT OFFICE (PMO IN HOSPITAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Antônio Carlos Pacagnella Jr.

    2016-12-01

    Full Text Available In a global environment, companies are finding the need to be increasingly agile and organized, seeking to formalize and improve the conduct of their projects. This article aims to investigate the contributions to the implementation of the PMO in Hospital Management through a strategic approach. The methodology was developed from multicases study by an exploratory research.Under analysis, many benefits were identified, such as increased efficiency and effective, serving as a benchmark for other projects within the organization, adding a systemic view of all tactical processes management through the performance of the company's manageability.

  20. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  1. Integrated water resources management in the Ruhr River Basin, Germany.

    Science.gov (United States)

    Bode, H; Evers, P; Albrecht, D R

    2003-01-01

    The Ruhr, with an average flow of 80.5 m3/s at its mouth, is a comparatively small tributary to the Rhine River that has to perform an important task: to secure the water supply of more than 5 million people and of the industry in the densely populated region north of the river. The complex water management system and network applied by the Ruhrverband in the natural Ruhr River Basin has been developed step by step, over decades since 1913. And from the beginning, its major goal has been to achieve optimal conditions for the people living in the region. For this purpose, a functional water supply and wastewater disposal infrastructure has been built up. The development of these structures required and still requires multi-dimensional planning and performance. Since the river serves as receiving water and at the same time as a source of drinking water, the above-standard efforts of Ruhrverband for cleaner water also help to conserve nature and wildlife. Ruhrverband has summed up its environmental awareness in the slogan: "For the people and for the environment". This basic water philosophy, successfully applied to the Ruhr for more than 80 years, will be continued in accordance with the new European Water Framework Directive, enacted in 2000, which demands integrated water resources management in natural river basins, by including the good ecological status of surface waterbodies as an additional goal.

  2. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  3. Hydrothermal Testing of K Basin Sludge and N Reactor Fuel at Sludge Treatment Project Operating Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Thornton, Brenda M.

    2007-03-30

    The Sludge Treatment Project (STP), managed for the U. S. DOE by Fluor Hanford (FH), was created to design and operate a process to eliminate uranium metal from K Basin sludge prior to packaging for Waste Isolation Pilot Plant (WIPP). The STP process uses high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. Under nominal process conditions, the sludge will be heated in pressurized water at 185°C for as long as 72 hours to assure the complete reaction (corrosion) of up to 0.25-inch diameter uranium metal pieces. Under contract to FH, the Pacific Northwest National Laboratory (PNNL) conducted bench-scale testing of the STP hydrothermal process in November and December 2006. Five tests (~50 ml each) were conducted in sealed, un-agitated reaction vessels under the hydrothermal conditions (e.g., 7 to 72 h at 185°C) of the STP corrosion process using radioactive sludge samples collected from the K East Basin and particles/coupons of N Reactor fuel also taken from the K Basins. The tests were designed to evaluate and understand the chemical changes that may be occurring and the effects that any changes would have on sludge rheological properties. The tests were not designed to evaluate engineering aspects of the process. The hydrothermal treatment affected the chemical and physical properties of the sludge. In each test, significant uranium compound phase changes were identified, resulting from dehydration and chemical reduction reactions. Physical properties of the sludge were significantly altered from their initial, as-settled sludge values, including, shear strength, settled density, weight percent water, and gas retention.

  4. Project Management: Essential Skill of Nurse Informaticists.

    Science.gov (United States)

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed.

  5. Status of groundwater quality in the Coastal Los Angeles Basin, 2006-California GAMA Priority Basin Project

    Science.gov (United States)

    Goldrath, Dara; Fram, Miranda S.; Land, Michael; Belitz, Kenneth

    2012-01-01

    Groundwater quality in the approximately 860-square-mile (2,227-square-kilometer) Coastal Los Angeles Basin study unit (CLAB) was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study area is located in southern California in Los Angeles and Orange Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA CLAB study was designed to provide a spatially unbiased assessment of the quality of untreated (raw) groundwater in the primary aquifer system. The assessment is based on water-quality and ancillary data collected in 2006 by the USGS from 69 wells and on water-quality data from the California Department of Public Health (CDPH) database. The primary aquifer system was defined by the depth interval of the wells listed in the CDPH database for the CLAB study unit. The quality of groundwater in the primary aquifer system may be different from that in the shallower or deeper water-bearing zones; shallow groundwater may be more vulnerable to surficial contamination. This study assesses the status of the current quality of the groundwater resource by using data from samples analyzed for volatile organic compounds (VOCs), pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements. This status assessment is intended to characterize the quality of groundwater resources in the primary aquifer system of the CLAB study unit, not the treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentration divided by the health- or aesthetic-based benchmark concentration) were used for evaluating groundwater quality for those constituents that have Federal and (or) California regulatory or non-regulatory benchmarks for drinking-water quality. A relative

  6. PMP Project Management Professional Exam Study Guide

    CERN Document Server

    Heldman, Kim

    2011-01-01

    Completely updated for the 2011 version of the PMP exam! If you're preparing for the Project Management Professional (PMP) exam, this thorough book is what you need. Not only does it reflect the very latest version of the exam, it is written by popular project management expert Kim Heldman—author of the five previous editions of this top-selling book—and it also includes a CD with practice exams, exam prep software, electronic flashcards, and over two hours of additional audio review. All exam objectives, as well as essential PMP topics, concepts, and key terms are covered.Prepares

  7. International Project Management Committee: Overview and Activities

    Science.gov (United States)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  8. Transforming local government by project portfolio management

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Kræmmergaard, Pernille

    2013-01-01

    Purpose – As public organizations strive for higher e-government maturity, Project Portfolio Management (IT PPM) has become a high priority issue. Assuming control is central in IT PPM, we investigate how a Danish local government conducts control in IT PPM; we identify control problems...... hierarchical levels difficult, which deprives organizations of the opportunity to pursue and display unambiguous value from their e-government initiatives. Originality/value – This paper fulfills an identified need to understand how local governments can improve IT PPM. Keywords – IT Project Portfolio...... Management, e-government, Control theory, control problems, formal mechanisms, informal mechanisms. Article type – Case study...

  9. An Operational ’Project Management Culture’ Framework (Part 1

    Directory of Open Access Journals (Sweden)

    Yvonne du Plessis

    2006-11-01

    Full Text Available The aim of this research is to develop an operational ‘project management culture’ framework, which can be used by project managers and organisations to support project work. One of the main causes of project failure is attributed to a non-supportive project management culture in organisations. A triangulation method is followed inclusive of a thorough literature review, a survey questionnaire and a concept mapping process. A project management culture framework with descriptive elements, based on Deal and Kennedy’s (1982 definition of organisational culture, comprising of four dimensions i.e. project process; people in projects; project systems and structure, and project environment was developed.

  10. 76 FR 3655 - Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside...

    Science.gov (United States)

    2011-01-20

    ... Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and.../DEIS) for the proposed Riverside-Corona Feeder (RCF) Project. Interested parties are invited to comment..., 555 West 6th Street, San Bernardino, California 92410 Corona Public Library, 650 South Main...

  11. Gender issues in project management: A subtlety

    Directory of Open Access Journals (Sweden)

    Pacha, Malyadri

    2013-01-01

    Full Text Available There are 2 bottlenecks in the drive of literacy towards women empowerment. Classifying women in India into 2 economic categories, the lower socio-economic category is still struggling to establish a higher literacy rate amongst the girl child. In the upper strata, where education equality has been established, the concern is equality in the corporate world. The present paper is an attempt to analyze the impact of growing project management responsibilities on women. Have women in software project management shifted from this technical and marketing fronts to other soft skill departments to combat issues of domestic and corporate imbalance or have they stepped off from the corporate ladder! The paper tries to derive a pattern of both similarity and difference in the managerial competence of male and female managers in the technological domain and analyze the steps to arrive at the androgynous manager model.

  12. The role of Natural Flood Management in managing floods in large scale basins during extreme events

    Science.gov (United States)

    Quinn, Paul; Owen, Gareth; ODonnell, Greg; Nicholson, Alex; Hetherington, David

    2016-04-01

    There is a strong evidence database showing the negative impacts of land use intensification and soil degradation in NW European river basins on hydrological response and to flood impact downstream. However, the ability to target zones of high runoff production and the extent to which we can manage flood risk using nature-based flood management solution are less known. A move to planting more trees and having less intense farmed landscapes is part of natural flood management (NFM) solutions and these methods suggest that flood risk can be managed in alternative and more holistic ways. So what local NFM management methods should be used, where in large scale basin should they be deployed and how does flow is propagate to any point downstream? Generally, how much intervention is needed and will it compromise food production systems? If we are observing record levels of rainfall and flow, for example during Storm Desmond in Dec 2015 in the North West of England, what other flood management options are really needed to complement our traditional defences in large basins for the future? In this paper we will show examples of NFM interventions in the UK that have impacted at local scale sites. We will demonstrate the impact of interventions at local, sub-catchment (meso-scale) and finally at the large scale. These tools include observations, process based models and more generalised Flood Impact Models. Issues of synchronisation and the design level of protection will be debated. By reworking observed rainfall and discharge (runoff) for observed extreme events in the River Eden and River Tyne, during Storm Desmond, we will show how much flood protection is needed in large scale basins. The research will thus pose a number of key questions as to how floods may have to be managed in large scale basins in the future. We will seek to support a method of catchment systems engineering that holds water back across the whole landscape as a major opportunity to management water

  13. LINKING PROJECTS TO BUSINESS STRATEGY THROUGH PROJECT PORTFOLIO MANAGEMENT

    Directory of Open Access Journals (Sweden)

    A.J. Buys

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: In many organisations, a chasm exists between the development of strategy and its successful implementation. Failure to cross this chasm may ultimately result in strategy failure and the loss of competitive advantage, profits, and employment. Project Portfolio Management (PPM is theorised as a management methodology that links a portfolio of projects to the business strategy. However, current literature lacks empirical evidence of the levels of employment, functionality, and success of the Project Portfolio Management approach in South Africa. A survey of respondents in 32 technology organisations was used to analyze the reasons for the following: strategy implementation and project delivery failure in South African technology organisations; the South African situation regarding the chasm that exists in many organisations between strategy development and successful strategy implementation; and the extent to which – and with what success – Project Portfolio Management is employed in South African technology organisations.

    AFRIKAANSE OPSOMMING: In baie organisasies bestaan daar ’n gaping tussen strategie-ontwikkeling en suksesvolle strategie-implementering. Die onvermoë om die gaping te oorbrug sal uiteindelik lei tot strategiefaling en die verlies van mededingende voordeel, winste, en werksgeleenthede. Projekportefeuljebestuur (PPB word voorgehou as ’n bestuursmetodologie wat ’n portefeulje van projekte koppel aan die besigheidstrategie. Bestaande literatuur gaan egter mank aan empiriese bewyse ten opsigte van die vlakke van indiensneming, funksionaliteit, en sukses van die Projekportefeuljebestuursbenadering in Suid-Afrika. ’n Opname van respondente in 32 tegnologie-organisasies is gebruik om die volgende aspekte te ondersoek: die redes vir falings in strategie-implementering en projekaflewering in Suid-Afrikaanse tegnologie-organisasies; die Suid-Afrikaanse situasie rakende die gaping wat bestaan tussen

  14. Agile project management. A case study on agile practices

    OpenAIRE

    Henriksen, André

    2016-01-01

    In project management and particularly software project management, there has been a shift from traditional plan based project management to the agile event driven project management style. Agile project management has for some time been viewed as the new big change that will revolutionize the software industry. The concept of agile has been around for some time, and although knowledge and usage are increasing, agile is not always the answer. Understanding when to use agile and which succ...

  15. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  16. A decision model for energy companies that sorts projects, classifies the project manager and recommends the final match between project and project manager

    Directory of Open Access Journals (Sweden)

    Elaine Cristina Batista de Oliveira

    2016-03-01

    Full Text Available Abstract This study presents an integrated model to support the process of classifying projects and selecting project managers for these projects in accordance with their characteristics and skills using a multiple criteria decision aid (MCDA approach. Such criteria are often conflicting. The model also supports the process of allocating project managers to projects by evaluating the characteristics/types of projects. The framework consists of a set of structured techniques and methods that are deemed very appropriate within the context of project management. A practical application of the proposed model was performed in a Brazilian electric energy company, which has a portfolio of projects that are specifically related to the company´s defined strategic plan. As a result, it was possible to classify the projects and project managers into definable categories, thus enabling more effective management as different projects require different levels of skills and abilities.

  17. Integrated Water Resources Management Improving Langat Basin Ecosystem Health

    Directory of Open Access Journals (Sweden)

    Mazlin B. Mokhtar

    2008-01-01

    Full Text Available The ecosystem provides us with all the goods and services that form the base of our economic, social cultural and spiritual life. Good scientific information will be required for managing the environment by using the Ecosystem approach. The groundwater is considered as a possible supplementary of alternative water source, and some factories already started shifting their water source from surface water to groundwater. Uncontrolled use of groundwater, however, may induce serious environmental problems, e.g., land subsidence, saltwater intrusion to the aquifer. The establishment of a balanced multi-sector and integrated groundwater resources and environmental management plan is deemed urgent to attain a sustainable groundwater resources use and to maintain a favorable groundwater quality in the Langat Basin. To achieve sustainable lifestyle in large scale ecosystem requires integrated and holistic approaches from all stakeholders. Through Aquifer Storage Recovery (ASR it was determined a revolutionized water resources management, providing a sustainable supply while minimizing the environmental impact of surface storage. By using underground geologic formations to store water, by integrated water resources management advisory system (IWRMAS aquifer recharge can now easily applied to obviate water resource and environmental problems, including seasonal shortages, emergency storage, ground subsidence and saline intrusion.

  18. Habitat Management Plan for Ernest F. Hollings Ace Basin National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Ernest F. Hollings Ace Basin NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  19. Transforming River Basin Management In South Africa: Lessons from the Lower Komati River

    NARCIS (Netherlands)

    Waalewijn, P.; Wester, P.; Straaten, van K.

    2005-01-01

    This paper analyzes the transformation of river basin management in South Africa by focusing on the political processes involved in the creation of new water management bodies and irrigation infrastructure in the Lower Komati sub-basin. Institutional reform is described and analyzed in terms of the

  20. Witwatersrand Water Ingress Project - Information Management System (WWIPIMS), South Africa

    Energy Technology Data Exchange (ETDEWEB)

    Hild, S.; Sieste, M.; Barth, A.; Rudinskaya, J. [Beak Consultants GmbH, Freiberg (Germany); Croukamp, L.; Roos, M. [Council for Geoscience (CGS), Pretoria (South Africa)

    2006-07-01

    The Witwatersrand Water Ingress Project at the Council for Geoscience, South Africa (CGS) deals with an inventory, a risk assessment and the development of rehabilitation strategies for abandoned mining sites in the Witwatersrand Mining Basin. The main focus is the prevention of water ingress and to understand the future decanting scenario. An Information Management System consisting of both a relational database and an application for the Witwatersrand Water Ingress Project is established for accessing and managing all project-related data. This easy to use application makes the data available to all staff at the CGS via several modules as well as a GIS-component for accessing and querying spatial data. This will enable the scientists to derive further knowledge of the water flowing processes by directly using all of the existing up-to-date data. Many additional functions, such as the support for map printing on demand, extensive possibilities for inquiries, data import and export, diagrams and a GIS-viewer for spatial inquiries do complete the system. (orig.)

  1. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  2. Quality management of microfilming projects

    Directory of Open Access Journals (Sweden)

    Hans van Dormolen

    2003-06-01

    Full Text Available I would like to tell you something about my work as quality manager microfilming and about the high quality standards for substitute microfilming we apply within the Dutch preservation programme Metamorfoze. Let me start with going back in time a bit. To be precise, to the year 1870. In this year, William Henry Jackson went riding into the hills of Wyoming, USA. Jackson was the chief photographer for the Hayden expedition. The aim of the Hayden expedition was to record the area as minutely as possible, in order to convince politicians to turn this area into a national park. There were two Hayden expeditions: in 1870 and in 1871. For both of these expeditions William Henry Jackson was the chief photographer. In 1872, the area was indeed proclaimed a national park as a result of the expeditions. And the pictures William Henry Jackson took played an important role in this US government decision. The reason I'm telling you this is not because I want to chat about the beautiful environment of Yellowstone National Park, nor do I want to emphasize the fact that it was quite an achievement that William Henry Jackson was travelling into the Wild West on horseback and coach without breaking the glass negatives he used. It's because I would like to focus your attention on the fact that today we still have access to these photographs made by Jackson and many others of his colleagues from the early days of photography, due to the excellent conditions under which these materials have been kept all this time. Without any doubt, these photographs have an important cultural and historical value.

  3. A New Tool for Effective and Efficient Project Management

    Energy Technology Data Exchange (ETDEWEB)

    Willett, Jesse A [Washington State Univ., Pullman, WA (United States)

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  4. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  5. Case Studies in Project, Program, and Organizational Project Management

    CERN Document Server

    Milosevic, Dragan Z; Srivannaboon, Sabin

    2011-01-01

    The ever expanding market need for information on how to apply project management principles and the PMBOK contents to day-to-day business situations has been met by our case studies book by Harold Kerzner.  That book was a spin-off from and ancillary to his best selling text but has gained a life of its own beyond adopters of that textbook.  All indications are that the market is hungry for more cases while our own need to expand the content we control, both in-print and online woudl benefit from such an expansion of project management "case content". 

  6. AVLIS Production Plant Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  7. E-learning for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    This is a series of online videos designed for the Project management course, in my YouTube channel. The video links are currently private for my university course. Please email me at cka@asb.dk if you are interested in viewing them. The videos total about 12 hours of lectures, and are adapted to...

  8. Software Development Factories, the Project Management Perspective

    OpenAIRE

    Felician ALECU

    2012-01-01

    In a software factory, the applications are developed in the same way Henri Ford started manufacturing cars. In such a way, a customized solution could be obtained within a reasonable budget and within the foreseen timeframe. This development method offers a flexible solution that can be readapted rapidly and automatically to the changing business needs, so the Project Management becomes a real challenge.

  9. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  10. 50 top IT project management challenges

    CERN Document Server

    Doraiswamy, Premanand

    2012-01-01

    This book offers a focused and concise summary of 50 challenges facing today's IT project manager. The authors draw on years of practical experience (rather than classroom theory) to outline these challenges and offer useful tips and advice on how to deal with them.

  11. Managing uncertainty for sustainability of complex projects

    DEFF Research Database (Denmark)

    Brink, Tove

    2017-01-01

    Purpose: The research reveals how management of uncertainty can enable sustainability of complex projects.Design/methodology/approach: The research was conducted from June 2014 to May 2015 using a qualitative deductive approach among operation & maintenance (O&M) actors in offshore wind farms. Th...

  12. Towards a Taxonomy for Project Management Competences

    NARCIS (Netherlands)

    Nijhuis, S.A.; Vrijhoef, R.; Kessels, J.W.M.

    2015-01-01

    Recent research on project management competences did not use a standard set of competences. Twenty-five publications, published in or after 2000, show little agreement on their competences: of the 353 only twelve percent is named more than once. Of the 353, 31 are linked to communication, but a cla

  13. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  14. Accumulating project management knowledge through process theory

    NARCIS (Netherlands)

    Niederman, Fred; March, Salvatore T.; Mueller, Benjamin

    2014-01-01

    This paper describes how the general notion of process theory can provide a foundational component in a portfolio of project management theories. The paper begins by outlining a variety of views pertaining to the nature of theory and theory development. This forms a basis for understanding how theor

  15. Les Robertson, CERN's LCG project manager

    CERN Multimedia

    Maximilien Brice

    2003-01-01

    "The LCG will provide a vital test-bed for the new Grid computing technologies that are set to revolutionise the way scientists use the world's computing resources in areas ranging from fundamental research to medical diagnosis," said Les Robertson, CERN's LCG project manager. The Grid is a new method of sharing processing power between computers in centres around the world.

  16. Surface-water-quality assessment of the upper Illinois River basin in Illinois, Indiana, and Wisconsin; project description

    Science.gov (United States)

    Mades, D.M.

    1987-01-01

    In 1986, the U.S. Geological Survey began a National Water-Quality Assessment program to (1) provide nationally consistent descriptions of the current status of water quality for a large, diverse, and geographically distributed part of the Nation's surface- and ground-water resources; (2) define, where possible, trends in water quality; and (3) identify and describe the relations of both status and trends in water quality to natural factors and the history of land use and land- and waste-management activities. The program is presently in a pilot phase that will test and modify, as necessary, concepts and approaches in preparation for possible full implementation of the program in the future. The upper Illinois River basin is one of four basins selected to test the concepts and approaches of the surface-water-quality element of the national program. The basin drains 10,949 square miles of Illinois, Indiana, and Wisconsin. Three principal tributaries are the Kankakee and Des Plaines Rivers that join to form the Illinois River and the Fox River. Land use is predominantly agricultural; about 75 percent of the basin is cultivated primarily for production of corn and soybeans. About 13 percent of the basin is urban area, most of which is located in the Chicago metropolitan area. The population of the basin is about 7 million. About 6 million people live in the Des Plaines River basin. Many water-quality issues in the upper Illinois River basin are related to sediment, nutrients, potentially toxic inorganic and organic constituents, and to water-management practices. Occurrence of sediment and the chemical constituents in the rivers and lakes within the basin has the potential to adversely affect the water's suitability for aquatic life, recreation, or, through the consumption of fish, human health. The upper Illinois River basin project consists of five major activities. The first activity--analysis of existing information and preparation of a report that describes

  17. Uinta Basin Pneumatic Controller Research Project: Industry meeting slides

    Science.gov (United States)

    Upstream oil and natural gas (ONG) production has increased significantly within Utah’s Uinta & Ouray (U&O) Basin and across the United States over the last decade. ONG extraction and production activities can co-emit volatile organic compounds (VOCs), a subset of which consists...

  18. Designing Project Management for Global Software Development

    DEFF Research Database (Denmark)

    Tjørnehøj, Gitte; B. Balogh, Maria; Iversen, Cathrine

    2014-01-01

    Software development in distributed teams remains challenging despite rapid technical improvement in tools for communication and collaboration across distance. The challenges stem from geographical, temporal and sociocultural distance and manifest themselves in a variety of difficulties...... in the development projects. This study has identified a range of difficulties described in the literature of global software development, lacking sufficient solutions. In particular, advice for project managers is lacking. Design science research has been applied to design a model to guide project managers...... of distributed software teams, based on a practice study and informed by well-known theories. Our work pinpoints the difficulties of handling the vital informal processes in distributed collaboration that are so vulnerable because the distances risk detaining their growth and increasing their decay rate...

  19. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    each other in research and practice. Design/methodology/approach – This is an empirical paper based on collaborative research between in-dustry and researchers. PHD has developed principles and practices driven by industry consisting of 10 leading stars and the impact, leadership and flow (ILF) method...... ideas and local implementations. Findings – RPM and PHD share a focus on value creation, social processes, learning and complexity while PHD also focuses on lean thinking, agile thinking, front-end loading and leadership, which are largely topics beyond the RPM research stream. Originality......Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...

  20. Information technology and decision support tools for stakeholder-driven river basin salinity management

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, N.W.T; Cozad, D.B.; Lee, G.

    2010-01-01

    Innovative strategies for effective basin-scale salinity management have been developed in the Hunter River Basin of Australia and more recently in the San Joaquin River Basin of California. In both instances web-based stakeholder information dissemination has been a key to achieving a high level of stakeholder involvement and the formulation of effective decision support salinity management tools. A common element to implementation of salinity management strategies in both river basins has been the concept of river assimilative capacity for controlling export salt loading and the potential for trading of the right to discharge salt load to the river - the Hunter River in Australia and the San Joaquin River in California. Both rivers provide basin drainage and the means of exporting salt to the ocean. The paper compares and contrasts the use of monitoring, modeling and information dissemination in the two basins to achieve environmental compliance and sustain irrigated agriculture in an equitable and socially and politically acceptable manner.

  1. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  2. Making Project Managers Project management grows with and boosts China's economic development

    Institute of Scientific and Technical Information of China (English)

    LIU XlNLIAN

    2011-01-01

    Project management certification is a relatively new trend in China,but already professional training courses on the discipline are expanding rapidly across the country.Since 1999 when the State Administration of Foreign Experts Affairs (SAFEA) and Project Management Institute (PMI) from the United States introduced project management professional certification in China,over 90,000 Chinese have taken the courses and about 53,000 of them have successfully obtained certification as of August 2011,according to Craig Killough,Vice President of PMI at the Second PMI Congress held in Beijing from September 16-17.

  3. Experiences in managing the Prometheus Project

    Science.gov (United States)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  4. Strategic Context of Project Portfolio Management

    Directory of Open Access Journals (Sweden)

    Nedka Nikolova

    2016-06-01

    Full Text Available In 2014 Bulgaria entered its second programming period (2014-2020 which opened a new stage in the development of project management in our country. Project-oriented companies are entering a new stage in which based on experience and increased design capacity they will develop their potential and will accelerate growth. This poses new challenges for science and business to identify strategic opportunities and formulation of project objectives, programs and portfolios of projects that will increase the competitive potential of companies and the economy as a whole. This article is an expression of the shared responsibility of science to develop the scientific front to solve methodologically difficult and practically new tasks that are derived from the needs to increase the competitive potential of the business-based project approach. The main objective of this study is based on the systematization of the results of theoretical research and development of methodology of Project Portfolio Management to explore the opportunities for its application in Bulgarian industrial companies.

  5. Project communication management in complex environments

    CERN Document Server

    Ying, Zhong

    2014-01-01

    This unique book that deals with project communication management in complex environments, taking a leaf from China’s experience with a major earthquake in Sichuan, would be a timely contribution to fill this lacuna. Readers would be able to understand how companies and organizations that are unprepared for crisis management would react to their detriment. The lessons provided in this book are the only one of its kind to highlight the lessons for companies and organizations to prepare themselves for successful project communication management through the complexity-informed framework. Although the book is written by two building professionals, the concepts and lessons presented are generic and equally applicable for businesses outside of the construction industry; for example, for airports, resorts, hotels, shipyards, etc.

  6. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  7. Watcr Security Situation in Haihc Rivcr Basin after South-to-North Watcr Transfer Project

    Institute of Scientific and Technical Information of China (English)

    JIA Shaofeng; YAN Tingting; LUE Aifeng

    2012-01-01

    The over-exploitation of water resources in the Haihe River Basin (HRB) has now become a serious problem. This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of over-exploited groundwater has reached over 1000×10^8m^3. It is important to note that the exploitation of water resources in HRB was reasonable before 1979. After 1980, however, over-exploitation happened with an annual average amount of 40×10^8m^3. Both the dry season and rapid economic growth in HRB took place at the same time. Therefore, the over-exploitation of water in HRB was actually the negative result of the conjunction of a continuous dry season and rapid economic growth. So the over-exploitation would not be as serious as it is today if either of the above two stopped. After the first stage of south-to-north water transfer project, the water shortage problem in HRB could be eased for the following reasons: firstly, water transfer project will bring to the Basin 60x108m3 water resources; secondly, a wet season will come back eventually according to natural law of climate variability; finally, its agricultural and industrial use and total water consumption all have decreased from the peak value, so that the groundwater table will raise certainly and ecological water in rivers and lakes that were dried-up will be partly restored. In the future, the main problem of water resources security in HRB will include water pollution, operation risk of the south-to-north water transfer project, groundwater pollution and engineering geological hazards that may be brought by groundwater rise. The proposed countermeasures are as follows: keeping strengthening water demand management, raising water price as well as subsidies for the low- income family and improving other water related policies, preventing and dealing with water pollution seriously and getting fully prepared for the operation of south-to-north water transfer project.

  8. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  9. THE ROLE OF PROJECT MANAGER AND PROJECT TEAM IN PROJECT MANAGEMENT

    OpenAIRE

    KLIMIUK JOLANTA

    2009-01-01

    В материале описаны роль, функции, а также компетенции заведующего проектом, а также роль, которую выполняет группа управления проектом.The material describes the role, functions and competitions that should characterize the project leader and the role of project’s managing team.

  10. Groundwater simulation and management models for the upper Klamath Basin, Oregon and California

    Science.gov (United States)

    Gannett, Marshall W.; Wagner, Brian J.; Lite, Kenneth E.

    2012-01-01

    the pumped water comes from groundwater storage over a broad geographic area even after two decades. Moreover, because the effects are spread out over a broad area, the impacts to individual features are much smaller than in the case of nearby pumping. Simulations show that the discharge features most affected by pumping in the area of the Bureau of Reclamation's Klamath Irrigation Project are agricultural drains, and impacts to other surface-water features are small in comparison. A groundwater management model was developed that uses techniques of constrained optimization along with the groundwater flow model to identify the optimal strategy to meet water user needs while not violating defined constraints on impacts to groundwater levels and streamflows. The coupled groundwater simulation-optimization models were formulated to help identify strategies to meet water demand in the upper Klamath Basin. The models maximize groundwater pumping while simultaneously keeping the detrimental impacts of pumping on groundwater levels and groundwater discharge within prescribed limits. Total groundwater withdrawals were calculated under alternative constraints for drawdown, reductions in groundwater discharge to surface water, and water demand to understand the potential benefits and limitations for groundwater development in the upper Klamath Basin. The simulation-optimization model for the upper Klamath Basin provides an improved understanding of how the groundwater and surface-water system responds to sustained groundwater pumping within the Bureau of Reclamation's Klamath Project. Optimization model results demonstrate that a certain amount of supplemental groundwater pumping can occur without exceeding defined limits on drawdown and stream capture. The results of the different applications of the model demonstrate the importance of identifying constraint limits in order to better define the amount and distribution of groundwater withdrawal that is sustainable.

  11. The Future of Project Management in Technical Communication

    DEFF Research Database (Denmark)

    Kampf, Constance

    2006-01-01

    Project Management increasing shapes workplace communication, especially when technical commuicators participate in cross-disciplinary development teams. This paper looks at the future of project management in technical communication and argues for a communicative approach to project management...... for technical communication students. The Project Management course in the International Bachelor Program of Marketing and Management Communication at the Aarhus School of Business is described, and the implications fortechnical communication curricula are discussed....

  12. 78 FR 17643 - Greater Mississippi River Basin Water Management Board; Engineer Regulation No. 15-2-13

    Science.gov (United States)

    2013-03-22

    ... Department of the Army, U.S. Army Corps of Engineers Greater Mississippi River Basin Water Management Board... Corps Greater Mississippi River Basin Water Management Board. It is applicable to all Corps offices involved with water management within the Greater Mississippi River Basin. The Board consists of the...

  13. Beyond water, beyond boundaries: spaces of water management in the Krishna river basin, South India.

    Science.gov (United States)

    Venot, Jean-Philippe; Bharati, Luna; Giordano, Mark; Molle, François

    2011-01-01

    As demand and competition for water resources increase, the river basin has become the primary unit for water management and planning. While appealing in principle, practical implementation of river basin management and allocation has often been problematic. This paper examines the case of the Krishna basin in South India. It highlights that conflicts over basin water are embedded in a broad reality of planning and development where multiple scales of decisionmaking and non-water issues are at play. While this defines the river basin as a disputed "space of dependence", the river basin has yet to acquire a social reality. It is not yet a "space of engagement" in and for which multiple actors take actions. This explains the endurance of an interstate dispute over the sharing of the Krishna waters and sets limits to what can be achieved through further basin water allocation and adjudication mechanisms – tribunals – that are too narrowly defined. There is a need to extend the domain of negotiation from that of a single river basin to multiple scales and to non-water sectors. Institutional arrangements for basin management need to internalise the political spaces of the Indian polity: the states and the panchayats. This re-scaling process is more likely to shape the river basin as a space of engagement in which partial agreements can be iteratively renegotiated, and constitute a promising alternative to the current interstate stalemate.

  14. Agent-Based Simulations for Project Management

    Science.gov (United States)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  15. A Heuristic Dynamically Dimensioned Search with Sensitivity Information (HDDS-S) and Application to River Basin Management

    OpenAIRE

    Jinggang Chu; Yong Peng; Wei Ding; Yu Li

    2015-01-01

    River basin simulation and multi-reservoir optimal operation have been critical for river basin management. Due to the intense interaction between human activities and river basin systems, the river basin model and multi-reservoir operation model are complicated with a large number of parameters. Therefore, fast and stable optimization algorithms are required for river basin management under the changing conditions of climate and current human activities. This study presents a new global opti...

  16. Web-based Projects Evaluation Management System

    Directory of Open Access Journals (Sweden)

    S. Al-Zoubi

    2008-01-01

    Full Text Available This project designs a Web-based evaluation management system for the College of Arts and Sciences (CAS. Problem statement: The Msc students in College of Arts and Sciences (CAS in applied sciences had to take their final project as a project paper in order to fulfill the requirements of their programs and be able to graduate. The final project was evaluated in two parts; first part is representing 40% of the total mark and evaluated by evaluators. Second part was representing 60% of the total mark and evaluated by the student's supervisor. These evaluation were done manually. Both the evaluators and supervisors had to fill in the evaluation forms manually and submit them to the office. Approach: The design research methodology or sometimes called "improvement research" contained the major steps: Awareness the problem, suggestion, development, evaluation and conclusion. Results: Both evaluators and supervisors can fill in the evaluation forms through the Internet. Bring the advantage of saving time and resources over traditional paper and pencil scan sheet method. For enhancing the performance of current final project evaluation process in College of Arts and Sciences (CAS this study proposed a web based evaluation management system to replace the current paper forms used by the evaluators and supervisors. Conclusion: Implementing this system will enable the evaluation results to be entered, presume and retrieved anytime anywhere.

  17. NASA's Cryogenic Fluid Management Technology Project

    Science.gov (United States)

    Tramel, Terri L.; Motil, Susan M.

    2008-01-01

    The Cryogenic Fluid Management (CFM) Project's primary objective is to develop storage, transfer, and handling technologies for cryogens that will support the enabling of high performance cryogenic propulsion systems, lunar surface systems and economical ground operations. Such technologies can significantly reduce propellant launch mass and required on-orbit margins, reduce or even eliminate propellant tank fluid boil-off losses for long term missions, and simplify vehicle operations. This paper will present the status of the specific technologies that the CFM Project is developing. The two main areas of concentration are analysis models development and CFM hardware development. The project develops analysis tools and models based on thermodynamics, hydrodynamics, and existing flight/test data. These tools assist in the development of pressure/thermal control devices (such as the Thermodynamic Vent System (TVS), and Multi-layer insulation); with the ultimate goal being to develop a mature set of tools and models that can characterize the performance of the pressure/thermal control devices incorporated in the design of an entire CFM system with minimal cryogen loss. The project does hardware development and testing to verify our understanding of the physical principles involved, and to validate the performance of CFM components, subsystems and systems. This database provides information to anchor our analytical models. This paper describes some of the current activities of the NASA's Cryogenic Fluid Management Project.

  18. Scaling issues in multi-criteria evaluation of combinations of measures for integrated river basin management

    Science.gov (United States)

    Dietrich, Jörg

    2016-05-01

    In integrated river basin management, measures for reaching the environmental objectives can be evaluated at different scales, and according to multiple criteria of different nature (e.g. ecological, economic, social). Decision makers, including responsible authorities and stakeholders, follow different interests regarding criteria and scales. With a bottom up approach, the multi criteria assessment could produce a different outcome than with a top down approach. The first assigns more power to the local community, which is a common principle of IWRM. On the other hand, the development of an overall catchment strategy could potentially make use of synergetic effects of the measures, which fulfils the cost efficiency requirement at the basin scale but compromises local interests. Within a joint research project for the 5500 km2 Werra river basin in central Germany, measures have been planned to reach environmental objectives of the European Water Framework directive (WFD) regarding ecological continuity and nutrient loads. The main criteria for the evaluation of the measures were costs of implementation, reduction of nutrients, ecological benefit and social acceptance. The multi-criteria evaluation of the catchment strategies showed compensation between positive and negative performance of criteria within the catchment, which in the end reduced the discriminative power of the different strategies. Furthermore, benefit criteria are partially computed for the whole basin only. Both ecological continuity and nutrient load show upstream-downstream effects in opposite direction. The principles of "polluter pays" and "overall cost efficiency" can be followed for the reduction of nutrient losses when financial compensations between upstream and downstream users are made, similar to concepts of emission trading.

  19. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  20. Results of agile project management implementation in software engineering companies

    Directory of Open Access Journals (Sweden)

    Suetin Sergei

    2016-01-01

    Full Text Available Agile project management methodologies, tools and techniques have been becoming more and more popular among Russian and foreign software companies. Though the agile software project management methodologies appear to be more flexible and sound alternative to traditional project management approaches, the practice of agile project management implementation needs more research. The article presents the research on the practical results of agile project management implementation in Russian software engineering companies. The survey-based study covers 8 companies and 35 their projects managed with the help of agile methodologies. In contrast to some optimistic researchers of agile practices, the research findings show that in the investigated projects agile project management led to the deterioration of cost and schedule performance. However, the quality, both perceived by clients and assessed by internal technical analysts, improved after the implementation of agile software project management practices.

  1. International Project Management Leadership in Complex Environments

    CERN Document Server

    Grisham, Thomas W

    2011-01-01

    The theory, practice, and example projects of international project management A Singaporean corporation builds a manufacturing facility in Cambodia, with a Chinese partner, a Cambodian government agency, and value chain organizations in Germany, Morocco, Vietnam, and Brazil. A Russian charity operates in the Balkans and the Persian Gulf. Pharmaceuticals and food come from ten different countries, physicians are from the EU and Russia, and donations are from Central Asia and the subcontinent. A transnational organization markets through divisions in eighty-two countries. The products are desig

  2. Reservoir compartmentalization and management strategies: Lessons learned in the Illinois basin

    Energy Technology Data Exchange (ETDEWEB)

    Grube, J.P.; Crockett, J.E.; Huff, B.G. [and others

    1997-08-01

    A research project jointly sponsored by the US Department of Energy and the Illinois State Geological Survey focused on the Cypress and Aux Vases Formations (Mississippian), major clastic reservoirs in the Illinois Basin. Results from the research showed that understanding the nature and distribution of reservoir compartments, and using effective reservoir management strategies, can significantly improve recovery efficiencies from oil fields in this mature basin. Compartments can be most effectively drained where they are geologically well defined and reservoir management practices are coordinated through unified, compartment-wide, development programs. Our studies showed that the Cypress and Aux Vases reservoirs contain lateral and vertical permeability barriers forming compartments that range in size from isolated, interlaminated sandstone and shale beds to sandstone bodies tens of feet in thickness and more than a mile in length. Stacked or shingled, genetically similar sandstone bodies are commonly separated by thin impermeable intervals that can be difficult to distinguish on logs and can, therefore, cause correlation problems, even between wells drilled on spacing of less than ten acres. Lateral separation of sandstone bodies causes similar problems. Reservoir compartmentalization reduces primary and particularly secondary recovery by trapping pockets of by-passed or banked oil. Compartments can be detected by comparing recovery factors of genetically similar sandstone bodies within a field; using packers to separate commingled intervals and analyzing fluid recoveries and pressures; making detailed core-to-log calibrations that identify compartment boundaries; and analyzing pressure data from waterflood programs.

  3. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  4. Tidal River Management (TRM and Tidal Basin Management (TBM: A case study on Bangladesh

    Directory of Open Access Journals (Sweden)

    Talchabhadel Rocky

    2016-01-01

    Full Text Available Bangladesh is the biggest delta of the world. Construction of numbers of polders is one of the flood resilient approach. But the presence of coastal polders de-linked the flood plain. The siltation in river causes riverbeds to become higher than the adjacent crop lands, and vast area under the polders became permanently water logged rendering large tract of land uncultivable. The current practice is temporarily de-poldering by cutting embankment. This is a natural water management process with very little human interventions but it needs strong participation and consensus with a great deal of sacrifice by the stakeholders for a specific period (3 to 5 years or even more[1]. An attempt has been made to study the phenomena of tidal basin management reviewing some secondary data and processes involved in successfully operated tidal basins of Bangladesh. And preliminary laboratory experiments are carried out to precisely look into the suspended sediment transport. With varying outflow discharge and sediment supply, the transport processes are investigated. 3D sediment transport model developed using openFOAM has good agreement with experimental result and can be used to better understand effectiveness of tidal basin management.

  5. Managing Uncertainty and Conflict in IT Project Portfolio Management

    DEFF Research Database (Denmark)

    Pedersen, Keld; Agger Nielsen, Jeppe

    2011-01-01

    Maximizing the outcome of IT project investments has been a major concern for years. Several approaches have been suggested one of them being Project Portfolio Management (PPM). Even though PPM offers valuable techniques for aligning IT project portfolios with organizational needs and maximizing...... the outcome of project portfolios, practitioners find it difficult to implement. Our research suggests one of the reasons being the fact that PPM builds upon classic rational ideals about decision-making in organizations that are hard to realize and in some aspects counterproductive for non-routine decision......-making. Especially, we focus on the importance of incorporating mechanisms that deal with uncertainty and conflict during portfolio decision-making, and on the importance of identifying and understanding dysfunctional decision-making patterns as part of improving PPM practice. Reducing the reliance on classic...

  6. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    Energy Technology Data Exchange (ETDEWEB)

    Allee, Brian J. (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  7. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  8. Power Production Management of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Zhang Cheng

    2010-01-01

    @@ The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China,Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project's dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable references for the operation of oversized hydropower plants.

  9. Regional water quality management for the Dong Nai River Basin, Vietnam.

    Science.gov (United States)

    Grayman, W M; Day, H J; Luken, R

    2003-01-01

    A three-year study that started solely as an industrial pollution reduction effort in Dong Nai Province of Vietnam expanded into an ongoing regional river basin water quality management effort. The project was a cooperative effort between the United Nations (UNDP and UNIDO) and the Federal and Provincial governments in Vietnam. A comprehensive approach was used to assess the impacts and strategies for reducing industrial, municipal and agricultural pollution to the water, air and land. The strategy was based upon use of knowledge in four subject areas, economics, ecology, technology and institutions, integrated within a framework for regional environmental quality management, sometimes called Areawide Environmental Quality Management (AEQM). Dong Nal Province encompasses a major developing area immediately north of Ho Chi Minh City. The land area chosen for the AEQM study is the 1,400 square kilometre region in and around Bien Hoa that drains into the Dong Nai River. The Dong Nai River serves many purposes including navigation, fisheries and a water supply for both the Province and Ho Chi Minh City. Extensive industrial and residential development was underway and was projected to increase in the coming decade. A strategy for the control of pollution from liquid, gaseous and solid wastes for the period 1998 to 2010 in Dong Nai Province was developed.

  10. Manager of Educational Project and His Competencies

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available It is more than desirable for project-oriented activities to be conducted and managed by people with relevant knowledge and experience. At the same time, managers should have appropriate skills in order to apply knowledge and experience respectably in the context of the study field and the situation. The aim of this presented paper is to propose a competency model of educational projects which shall be primary used in the educational institutions. The contribution consists of two parts. The first part is focused on the basic terminology issues and anchor concepts such as competencies and the competency model. The second part is dedicated to the description of the specific proposal for a precise competency model and its subsequent presentation and verification.

  11. It's Just Rocket Science, Not Project Management

    DEFF Research Database (Denmark)

    Vangsgaard, Mikkel; Thuesen, Christian

    2015-01-01

    This paper presents an inductive, empirically based research on the Danish non-profit voluntary space association Copenhagen Suborbitals. The purpose was to execute a qualitative constructivist grounded theory study to discover and explain the behavior and operation of the case subject. Based...... and learning by doing. Unexpectedly the research evolved to support contemporary claims that the practice of project management has forgotten these values, and that intuitive and alternative methods should be accepted as viable project management....... on this, grounded theory methodology was found highly adequate, as it allowed an investigation without predetermined hypotheses, specific research questions, and a theoretical framework. The central question was: What are they actually doing? Therefore, prior to the study, the researcher formed...

  12. Is Agile Project Management Applicable to Construction?

    OpenAIRE

    Owen, R.; Koskela, LJ; Henrich, G; Codinhoto, R

    2006-01-01

    This paper briefly summarises the evolution of Agile Project Management (APM) and differentiates it from lean and agile production and ‘leagile’ construction. The significant benefits being realized through employment of APM within the information systems industry are stated. The characteristics of APM are explored, including: philosophy, organizational attitudes and practices, planning, execution and control and learning. Finally, APM is subjectively assessed as to its potential contribution...

  13. 信息管理系统在世行贷款淮河重点平原洼地治理项目中的应用%Application of Information Management System in Management and Drainage Improvement Project of Huai River Basin Flood

    Institute of Scientific and Technical Information of China (English)

    贾燕

    2011-01-01

    信息管理系统的设计开发和使用是世界银行贷款项目的特点之一,通过信息管理系统实现对项目工程、财务信息及时跟踪了解。信息管理系统设计的较为科学合理,收集的信息更为真实可靠,为项目决策提供有利保障,一定程度上促进项目管理水平的提高。该文主要介绍信息管理系统的功能,通过与现有水利工程管理信息收集体制的比较,分析信息管理系统的优点,探讨信息管理系统应用的前景和意义。%Using and designing of information management system is a characteristic of World Bank loan project.By using information management system,the information of project and finance can be learned timely.The design of information management system is scientific and rational,so that we can collect more real and reliable information by using in formation management system to make a favorable decision for the protection project,which raises the level of project management to some extent.The function and benifits of information management system were introduced.The prospects and significances of information management system was discussed.

  14. 75 FR 22423 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-04-28

    ... Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project... of the Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Proposed Project Use Power Rate Adjustment. ] SUMMARY: The Bureau of Reclamation is reopening the comment period for the...

  15. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  16. Knowledge Management Concepts For Training By Project An observation of the case of project management education

    CERN Document Server

    Michel, Christine

    2009-01-01

    Project management education programmes are often proposed in higher education to give students competences in project planning (Gantt's chart), project organizing, human and technical resource management, quality control and also social competences (collaboration, communication), emotional ones (empathy, consideration of the other, humour, ethics), and organizational ones (leadership, political vision, and so on). This training is often given according a training-by-project type of learning with case studies. This article presents one course characterized by a pedagogical organization based upon Knowledge Management (KM) concepts: knowledge transfer and construction throughout a learning circle and social interactions. The course is supported by a rich and complex tutor organization. We have observed this course by using another KM method inspired from KADS with various return of experience formalized into cards and charts. Our intention is, according to the model of Argyris and Sch\\"on (Smith, 2001), to gai...

  17. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  18. Managing project interdependencies in IT/IS project portfolios: a review of managerial issues

    OpenAIRE

    Sameer Bathallath; Åsa Smedberg; Harald Kjellin

    2016-01-01

    Adequately managing project interdependencies among diverse and simultaneous projects is deemed critical for successful implementation of project portfolios. The challenge is significant because it may entail managing a complex network of project interdependencies that keeps changing over time. The present study investigates the managerial challenges that may undermine effective management of project interdependencies in IT/IS project portfolios. The investigation is based on evidence from re...

  19. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    The bestselling project management text for students and professionals-now updated and expanded This Eleventh Edition of the bestselling ""bible"" of project management maintains the streamlined approach of the prior editions and moves the content even closer to PMI''s Project Management Body of Knowledge (PMBOK). New content has been added to this edition on measuring project management ROI, value to the organization and to customers, and much more. The capstone ""super"" case on the ""Iridium Project"" has been maintained, covering all aspects of project management. Increased use of sideba

  20. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  1. Is project management the new management 2.0?

    Directory of Open Access Journals (Sweden)

    Steve A Leybourne

    2014-06-01

    Some theoretical frameworks are offered that assist in explaining the shift from the historically accepted ‘tools and techniques’ model to a more nuanced and behaviorally driven paradigm that is arguably more appropriate to manage change in today’s flexible and progressive organizations, and which provide a more coherent response, both in PM and traditional management, to McDonald’s forces. In addition, we offer a number of examples to robustly support our assertions, based around the development of innovative products from Apple Inc. In using this metaphor to demonstrate the evolution of project-based work, we link PM with innovation and new product development.

  2. Financial arrangement selection for energy management projects

    Science.gov (United States)

    Woodroof, Eric Aubrey

    Scope and method of study. The purpose of this study was to develop a model (E-FUND) to help facility managers select financial arrangements for energy management projects (EMPs). The model was developed with the help of a panel of expert financiers. The panel also helped develop a list of key objectives critical to the decision process. The E-FUND model was tested by a population of facility managers in four case studies. Findings and conclusions. The results may indicate that having a high economic benefit (from an EMP) is not overwhelmingly important, when compared to other qualitative objectives. The results may also indicate that the true lease and performance contract may be the most applicable financial arrangements for EMPs.

  3. Mechanisms of Change in Public Management Projects

    Directory of Open Access Journals (Sweden)

    Tiina Soininen

    2013-04-01

    Full Text Available This article draws conclusions from four separate case evaluations from different development programs in Finland and aims to discuss the role of welfare state values in new public management. The study develops a comprehensive picture of the change in public management since 2000. The synthesis of the four case studies follows the critical realism tradition. This article shows that cooperation forms the key mechanism in all public administration projects and in any changes to their structure. The new structure is the postmodern service production sector that still faces many challenges with regard to the traditional welfare state values. One of these is the conflict between the deep-seated moral imperatives of the old welfare state and the goal-attainment priorities of the new public management. While evaluation research has become one of the operations in public administration that fulfills the control function, the value bases of society, management, and evaluations should be balanced together. Also the objectives of public management and evaluations should be more clearly defined in relation to values other than efficiency. An applied science, like evaluation, needs basic social research to formulate, recognize, and conceptualize the new public management structure. Furthermore, there is an urgent requirement to address those values that underpin society as a whole.

  4. 75 FR 61414 - Basin Electric Power Cooperative: South Dakota PrairieWinds Project

    Science.gov (United States)

    2010-10-05

    ...) for the Environmental Impact Statement (EIS) for the proposed South Dakota PrairieWind Project... purpose of the EIS was to evaluate the potential environmental impacts of and alternatives to Basin... 151.5-megawatt (MW) nameplate capacity wind-powered energy generation facility that would feature...

  5. Klamath Basin Restoration Agreement Off-Project Water Program Distance to Gaining Streams and Lakes

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  6. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for May 2004

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  7. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for September 2004

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  8. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for July 2004

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  9. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for September 2006

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  10. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for July 2006

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  11. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for June 2004

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  12. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for August 2004

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  13. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for May 2006

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  14. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for October 2004

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  15. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for October 2006

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  16. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for June 2006

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  17. Land use projections for the Rhine Basin under possible future climates

    NARCIS (Netherlands)

    Veeneklaas, F.R.; Slothouwer, D.

    1995-01-01

    Possible future land use in the Rhine Basin is presented, both as a result of technical, economic, political and demographic developments and in view of changing climatic conditions caused by the greenhouse effect. For the decade 2040-2049 land use projections were made under both unchanged and chan

  18. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for April 2006

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  19. Klamath Basin Restoration Agreement Off-Project Water Program Distance to Perennial Streams and Lakes

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  20. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for August 2006

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  1. Klamath Basin Restoration Agreement Off-Project Water Program Evapotranspiration Map for April 2004

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Hydrological Information Products for the Off-Project Water Program of the Klamath Basin Restoration Agreement U.S. Geological Survey Open-File Report 2012-1199 U.S....

  2. Hydrological effects of water management measures in the Dovine River basin, Lithuania

    NARCIS (Netherlands)

    Querner, E.P.; Povilaitis, A.

    2009-01-01

    Lake Žuvintas, located in southern Lithuania in the Dovine River basin, is one of the largest lakes and oldest nature reserves in the country. However, changes in the hydrology of the Dovine River basin, caused by large-scale land reclamation and water management works carried out in the 20th centur

  3. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  4. Preparing Future Leaders: Project Management Strategies for Service Learning

    Science.gov (United States)

    Munger, Roger; Gutowski, Amanda

    2008-01-01

    This article makes a case for teaching project management strategies in service-learning courses. The authors describe three specific documents students can create to help them manage a service-learning project and then present strategies that can help students manage their project teams. Such skills, the authors argue, provide the tools students…

  5. 24 CFR 990.275 - Project-based management (PBM).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  6. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  7. Managing Complex Distance Education Projects in a Telework Environment

    Science.gov (United States)

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  8. A method to study the management of urban development projects

    NARCIS (Netherlands)

    Heurkens, E.

    2011-01-01

    The management of urban development projects in the Netherlands has changed significantly in recent years. These projects have become mainly ‘led’ by developers as they manage the entire life cycle of development projects, while public actors mainly facilitate development projects. This changes the

  9. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  10. Project manager insights: An analysis of career progression

    Directory of Open Access Journals (Sweden)

    James W Marion

    2014-08-01

    Full Text Available The project manager is key to the success of any project.  But the path to becoming a successful project manager is ill defined.  In this study, the authors analyzed interview results of 87 project managers’ responses to questions associated with entry into the field, career progression, and advice for the new project manager, seeking to better understand practicing project manager career progression.  Qualitative analysis techniques were used to identify recurring themes from the interview summaries. The themes and the resulting conceptual framework provide evidence that supports the development of successful project manager career path. Further, the results suggest individual project management competencies in soft skills as a key enabler of project execution.

  11. The Research of Project Management Tools and Techniques

    Institute of Scientific and Technical Information of China (English)

    XuDishi

    2005-01-01

    Effective project management on today's projects, where the emphasis is often on the rapid completion of the project, is not something that is learned entirely by reading a book or a report. But having the right training and the right tools makes a big difference. To be sure, even where project management is practiced professionally, the theories or the methodologies behind it are often misunderstood. As a role of management consultant, my report focus on the methods and their relationship project management use such as Earned Value Methodology, Scope Change Control, WBS (work breakdown structure) and Data Capture to plan, monitor and ultimately control projects. Thus, this report will contribute to a better understanding of how to utilize project management methods to plan and control projects so that they can be completed with constrain of time and cost. In addition, some companies in IT field for example can use computer software to manage project more effectively and efficiently.

  12. Adaptive Management of Bull Trout Populations in the Lemhi Basin

    Science.gov (United States)

    Peterson, James T.; Tyre, Andrew J.; Converse, Sarah J.; Bogich, Tiffany L.; Miller, Damien; Post van der Burg, Max; Thomas, Carmen; Thompson, Ralph J.; Wood, Jeri; Brewer, Donna; Runge, Michael C.

    2011-01-01

    The bull trout Salvelinus confluentus, a stream-living salmonid distributed in drainages of the northwestern United States, is listed as threatened under the Endangered Species Act because of rangewide declines. One proposed recovery action is the reconnection of tributaries in the Lemhi Basin. Past water use policies in this core area disconnected headwater spawning sites from downstream habitat and have led to the loss of migratory life history forms. We developed an adaptive management framework to analyze which types of streams should be prioritized for reconnection under a proposed Habitat Conservation Plan. We developed a Stochastic Dynamic Program that identified optimal policies over time under four different assumptions about the nature of the migratory behavior and the effects of brook trout Salvelinus fontinalis on subpopulations of bull trout. In general, given the current state of the system and the uncertainties about the dynamics, the optimal policy would be to connect streams that are currently occupied by bull trout. We also estimated the value of information as the difference between absolute certainty about which of our four assumptions were correct, and a model averaged optimization assuming no knowledge. Overall there is little to be gained by learning about the dynamics of the system in its current state, although in other parts of the state space reducing uncertainties about the system would be very valuable. We also conducted a sensitivity analysis; the optimal decision at the current state does not change even when parameter values are changed up to 75% of the baseline values. Overall, the exercise demonstrates that it is possible to apply adaptive management principles to threatened and endangered species, but logistical and data availability constraints make detailed analyses difficult.

  13. The Dust Management Project: Final Report

    Science.gov (United States)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  14. Rainwater Basin Wetland Management District: Annual narrative report: Calendar year 1989

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual narrative report for Rainwater Basin Wetland Management District outlines accomplishments during the 1989 calendar year. The report begins with a summary...

  15. Water Resources Inventory and Assessment for Kern National Wildlife Refuge and Tulare Basin Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Water Resource Inventory and Assessment report for Kern National Wildlife Refuge and Tulare Basin Wildlife Management Area describes hydrologic information,...

  16. Umatilla River Basin Anadromous Fsh Habitat Enhancement Project : 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R. Todd

    2001-12-31

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2000 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla River Basin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Habitat enhancement projects continued to be maintained on 44 private properties, four riparian easements and one in-stream enhancement agreement were secured, two new projects implemented and two existing projects improved to enhance anadromous fish habitat and natural fisheries production capabilities in the Umatilla River Basin. New project locations included sites on the mid Umatilla River and Buckaroo Creek. Improvements were implemented at existing project sites on the upper Umatilla River and Wildhorse Creek. A stream bank stabilization project was implemented at approximately River Mile 37.4 Umatilla River to stabilize 760 feet of eroding stream bank and improve in-stream habitat diversity. Habitat enhancements at this site included construction of six rock barbs with one large conifer root wad incorporated into each barb, stinging approximately 10,000 native willow cuttings, planting 195 tubling willows and 1,800 basin wildrye grass plugs, and seeding 40 pounds of native grass seed. Staff time to assist in development of a subcontract and fence materials were provided to establish eight spring sites for off-stream watering and to protect wetlands within the Buckaroo Creek Watershed. A gravel bar was moved and incorporated into an adjacent point bar to reduce stream energy and stream channel confinement within the existing project area at River Mile 85 Umatilla River. Approximately 10,000 native willow cuttings were stung and trenched into the stream channel margins and stream banks, and 360

  17. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  18. Strategic Project Management at the NASA Kennedy Space Center

    Science.gov (United States)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  19. Measuring productivity of customer knowledge management in projects

    Directory of Open Access Journals (Sweden)

    Tanika D. Sofianti

    2013-06-01

    Full Text Available Projects is one of the dominating modes of international business today. Companies interact with their customers in projects for a certain period. To explore the impact of customer knowledge management in such interactions, this paper promotes a measurement framework that can be used to measure the productivity of customer knowledge management. The measures are developed based on previous studies on customer knowledge management and project management. To verify the measures, this study conducted a survey involving 24 projects. The results of the study provide some insights into the impact of customer knowledge management in interactions between companies and their customers through projects.

  20. Solving Engineering, Project, and Production Management Problems through Modeling

    OpenAIRE

    Chien-Ho Ko

    2016-01-01

    This issue presents five papers covering engineering management, project management, and production management. While distinct, these three fields frequently overlap and share common managerial concepts, e.g. solving problems through modeling.

  1. Managing Operating Procedures in Distributed Collaborative Projects

    Science.gov (United States)

    Hool, A.; Beuzelin Ollivier, M.-G.; Roubert, F.

    2013-04-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity - a field which has only been under investigation for a few years and is still lacking regulatory framework - highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  2. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  3. Project Management Software for Distributed Industrial Companies

    Science.gov (United States)

    Dobrojević, M.; Medjo, B.; Rakin, M.; Sedmak, A.

    This paper gives an overview of the development of a new software solution for project management, intended mainly to use in industrial environment. The main concern of the proposed solution is application in everyday engineering practice in various, mainly distributed industrial companies. Having this in mind, special care has been devoted to development of appropriate tools for tracking, storing and analysis of the information about the project, and in-time delivering to the right team members or other responsible persons. The proposed solution is Internet-based and uses LAMP/WAMP (Linux or Windows - Apache - MySQL - PHP) platform, because of its stability, versatility, open source technology and simple maintenance. Modular structure of the software makes it easy for customization according to client specific needs, with a very short implementation period. Its main advantages are simple usage, quick implementation, easy system maintenance, short training and only basic computer skills needed for operators.

  4. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    implementations. Findings – RPM and PHD share a focus on value creation, social processes, learning and complexity while PHD also focusses on lean thinking, agile thinking, front-end loading and leadership, which are largely topics beyond the RPM research stream. Originality/value – The paper presents how...... and practice. Design/methodology/approach – This is an empirical paper based on collaborative research between industry and researchers. PHD has developed principles and practices driven by industry consisting of ten leading stars and the impact, leadership and flow (ILF) method. The ten leading stars and ILF......Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish rethinking project management (RPM) initiative named Project Half Double (PHD) and the RPM research stream. The paper furthermore discusses how PHD and RPM can inspire each other in research...

  5. Assessing and managing water scarcity within the Nile River Transboundary Basin

    Science.gov (United States)

    Butts, M. B.; Wendi, D.; Jessen, O. Z.; Riegels, N. D.

    2012-04-01

    The Nile Basin is the main source of water in the North Eastern Region of Africa and is perhaps one of the most critical river basins in Africa as the riparian countries constitute 40% of the population on the continent but only 10% of the area. This resource is under considerable stress with rising levels of water scarcity, high population growth, watershed degradation, and loss of environmental services. The potential impacts of climate change may significantly exacerbate this situation as the water resources in the Nile Basin are critically sensitive to climate change (Conway, Hanson, Doherty, & Persechino, 2007). The motivation for this study is an assessment of climate change impacts and adaptation potential for floods and droughts within the UNEP project "Adapting to climate change induced water stress in the Nile River Basin", supported by SIDA. This project is being carried out as collaboration between DHI, the UK Met Office, and the Nile Basin Initiative (NBI). The Nile Basin exhibits highly diverse climatological and hydrological characteristics. Thus climate change impacts and adaptive capacity must be addressed at both regional and sub-basin scales. While the main focus of the project is the regional scale, sub-basin scale modelling is required to reflect variability within the basin. One of the major challenges in addressing this variability is the scarcity of data. This paper presents an initial screening modelling study of the water balance of the Nile Basin along with estimates of expected future impacts of climate change on the water balance. This initial study is focussed on the Ethiopian Highlands and the Lake Victoria regions, where the impact of climate change on rainfall is important. A robust sub-basin based monthly water balance model is developed and applied to selected sub-basins. The models were developed and calibrated using publicly available data. One of the major challenges in addressing this variability within the basin is the

  6. A Review of Integrated River Basin Management for Sarawak River

    Directory of Open Access Journals (Sweden)

    Kuok K. Kuok

    2011-01-01

    Full Text Available Problem statement: Sarawak River was a life-sustaining water source for the residents in Kuching City and surrounding areas. Raw water is treated at Batu Kitang Water Treatment Plant (BKWTP that supplies more than 98% of the total water production in Kuching City. The raw water supply to BKWTP is not adequate to meet the ever increasing water demand. In order to overcome this problem, four projects had been implemented along Sarawak River for managing and securing water supply to BKWTP. Approach: These four projects are construction of 1.5m height storage weir across Sungai Sarawak Kiri river channel, Kuching Barrage and Shiplock, Bengoh Dam and Kuching Centralized Wastewater Management System (KCWMS. In 2005, 1.5 m height submersible weir was constructed across Sungai Sarawak Kiri channel for increasing the safe yield that can last until year 2010. Kuching Barrage and Shiplock were commissioned in 2000 as barrier to avoid the saline intrusion reaching upper catchment. 24 telemetry stations were installed along Sarawak River for monitoring and regulating the water level. This will preserve high quality water storage at upper catchment of Sarawak River. In year 2010, Bengoh Dam was constructed to ensure adequate raw water will be supplied to BKWTP for meeting the increasing water demand from 2010-2030. This reservoir will store 144 million m3 of fresh water covering reservoir area of 8.77km2. Beyond 2030, the water supply shall not depend solely on fresh water. Results: Black and grey water in Sarawak Catchment was treated through Kuching Centralized Wastewater Management System (KCWMS and recycled for daily used. Conclusion: The treated water that comply Standard A water quality, can distribute for domestic, industrial and irrigation used in nearest future. This will reduce the water demand solely on raw water and create a sustainable living in Kuching City. Beyond 2030, a few alternatives are also proposed for conserving and

  7. A participatory approach for Integrated River Basin Management in the Elbe catchment

    Science.gov (United States)

    Nunneri, C.; Hofmann, J.

    2005-02-01

    This paper presents a qualitative analysis of a series of in-depth interviews with governmental and non-governmental institutions (NGOs). Within the EUROCAT 1 project this methodology of participatory approach, aiming to scope the present perceptions about environmental issues and possible strategies for environmental improvement, is applied to the study of the Elbe catchment for the first time. In this frame, an Advisory Board (AB) was created, with the aim of giving insights into conflicting interests in the river catchment and guidelines for river basin management. Focus of the Elbe case study is the issue of nutrient enrichment (from the catchment) and the induced eutrophication of the coastal waters (the German Bight). Specifically, regarding this topic, the possible reduction of eutrophication in the German Bight by a (policy driven) decrease in nutrient inputs from the catchment area is analysed. Different measures for reducing the input of nutrients from the catchment, and ultimately preventing eutrophication of the coastal waters are considered. In this context, the members of the AB were asked about the efficiency and feasibility of different measures and the criteria for choosing 'better' management solutions among the possible ones. Although there is a general agreement about the necessity of reducing nutrient emissions, some members of the AB perceive other environmental issues (e.g. altered morphodynamics) as more relevant than nutrient enrichment. Voluntary cooperation, eco-efficiency and 'trans-sectoral' communication are the key concepts mentioned as being indispensable for integrated management. The (public) acceptance of measures for nutrient reduction have to find its way through compromises and social equity, allowing for win-win solutions among different groups of interests and balanced spatial division of costs and benefits. EUROpean CATchments, Project N° EVK1-CT-2000-00044 ( http://www.iia-cnr.unical.it/EUROCAT/project.htm).

  8. Information technology project risk management in Peru

    OpenAIRE

    Del Carpio Gallegos, Javier; Universidad Nacional Mayor de San Marcos

    2014-01-01

    This article shows how some principles, uses, and practices of risk management are applied in information technology projects in Peru; in the last four years, in representative sectors like manufacturing, banking, information and communications, academics institutions, construction, government, consulting, services, and others. El presente artículo muestra algunos principios, usos y prácticas de cómo la gestión de riesgos de proyectos de tecnología se ha llevado a cabo en los últimos cuatr...

  9. Projected effects of proposed chloride-control projects on shallow ground water; preliminary results for the Wichita River basin, Texas

    Science.gov (United States)

    Garza, Sergio

    1983-01-01

    The U.S. Army Corps of Engineers' plan to control the natural chloride pollution in the Wichita River basin includes the construction of Truscott Brine Lake on a tributary of the North Wichita River. In connection with the proposed brine lake, the U.S. Geological Survey was requested to: (1) Define the existing ground-water conditions in the shallow fresh-water system of the project area; and (2) project the post-construction effects of the proposed lake on the fresh-water aquifer, especially in relation to hydraulic-head changes but also with respect to possible changes in the chemical quality of the ground water.

  10. Reinventing project management the diamond approach to successful growth & innovation

    CERN Document Server

    Shenhar, Aaron J.

    2007-01-01

    Projects are the engines that drive innovation from idea to commercialization. In fact, the number of projects in most organizations today is expanding while operations is shrinking. Yet, since many companies still focus on operational excellence and efficiency, most projects fail--largely because conventional project management concepts cannot adapt to a dynamic business environment. Moreover, top managers neglect their company's project activity, and line managers treat all their projects alike--as part of operations. Based on an unprecedented study of more than 600 projects in a variety of businesses and organizations around the globe, "Reinventing Project Management" provides a new and highly adaptive model for planning and managing projects to achieve superior business results.

  11. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  12. Project management plan for project W-320, tank 241-C-106 sluicing

    Energy Technology Data Exchange (ETDEWEB)

    Leliefeld, K.W.

    1996-02-02

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  13. Project management best practices: forging win-win partnerships and mitigating power project risk

    Energy Technology Data Exchange (ETDEWEB)

    Trowsdale, R. [EPCOR Power Development Corp. (Canada)

    2006-07-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance.

  14. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    Science.gov (United States)

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  15. Exploring the Project Portfolio Manager's Role: Between a Data Manager and a Strategic Advisor

    NARCIS (Netherlands)

    Filippov, S.; Van der Weg, R.; Van Ogtrop, F.; Beelen, P.; Mooi, H.

    2014-01-01

    Many companies adopt project portfolio management processes to manage multi-project environments effectively and efficiently. One of the key roles in this process is assigned to the project portfolio manager. This role is formally defined in various guidelines and standards of portfolio management.

  16. An Integrated Decision Support System for Water Quality Management of Songhua River Basin

    Science.gov (United States)

    Zhang, Haiping; Yin, Qiuxiao; Chen, Ling

    2010-11-01

    In the Songhua River Basin of China, many water resource and water environment conflicts interact. A Decision Support System (DSS) for the water quality management has been established for the Basin. The System is featured by the incorporation of a numerical water quality model system into a conventional water quality management system which usually consists of geographic information system (GIS), WebGIS technology, database system and network technology. The model system is built based on DHI MIKE software comprising of a basin rainfall-runoff module, a basin pollution load evaluation module, a river hydrodynamic module and a river water quality module. The DSS provides a friendly graphical user interface that enables the rapid and transparent calculation of various water quality management scenarios, and also enables the convenient access and interpretation of the modeling results to assist the decision-making.

  17. Yakima/Klickitat Fisheries Project : Management, Data and Habitat, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin R.

    2002-03-01

    The Yakima/Klickitat Fisheries Project (YKFP or Project) is an all stock initiative that is responding to the need for scientific knowledge for rebuilding and maintaining naturally spawning anadromous fish stocks in both basins. The Yakama Nation, as the Lead Agency, in coordination with the co-managers, Washington Department of Fish and Wildlife and in cooperation with the Bonneville Power Administration, the funding agency, is pursuing this. We are testing the principles of supplementation as a means to rebuild fish populations through the use of locally adapted broodstock in an artificial production program. This concept is being utilized on the Spring Chinook within the Yakima River Basin. The coho and fall chinook programs were approved and implemented in the Yakima Basin. The coho programs principle objective is to determine if naturally spawning coho populations can be reintroduced throughout their biological range in the basin. The objective of the fall chinook program is to determine if supplementation is a viable strategy to increase fall chinook populations in the Yakima subbasin. The coho and fall chinook programs are under the three step process that was established by the Northwest Power Planning Council. The Klickitat subbasin management program is combined with the Yakima subbasin program. This contract includes the Klickitat Basin Coordinator and operational costs for the basin. The Klickitat Subbasin has separate contracts for Monitoring and Evaluation, Construction, and ultimately, Operation and Maintenance. In the Klickitat subbasin, we propose to use supplementation to increase populations of spring chinook and steelhead. This program is still in the developmental stages consistent with the three step process.

  18. Yakima/Klickitat Fisheries Project: Management, Data and Habitat, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin R.

    2002-03-01

    The Yakima/Klickitat Fisheries Project (YKFP or Project) is an all stock initiative that is responding to the need for scientific knowledge for rebuilding and maintaining naturally spawning anadromous fish stocks in both basins. The Yakama Nation, as the Lead Agency, in coordination with the co-managers, Washington Department of Fish and Wildlife and in cooperation with the Bonneville Power Administration, the funding agency, is pursuing this. We are testing the principles of supplementation as a means to rebuild fish populations through the use of locally adapted broodstock in an artificial production program. This concept is being utilized on the Spring Chinook within the Yakima River Basin. The coho and fall chinook programs were approved and implemented in the Yakima Basin. The coho programs principle objective is to determine if naturally spawning coho populations can be reintroduced throughout their biological range in the basin. The objective of the fall chinook program is to determine if supplementation is a viable strategy to increase fall chinook populations in the Yakima subbasin. The coho and fall chinook programs are under the three step process that was established by the Northwest Power Planning Council. The Klickitat subbasin management program is combined with the Yakima subbasin program. This contract includes the Klickitat Basin Coordinator and operational costs for the basin. The Klickitat Subbasin has separate contracts for Monitoring & Evaluation, Construction, and ultimately, Operation and Maintenance. In the Klickitat subbasin, we propose to use supplementation to increase populations of spring chinook and steelhead. This program is still in the developmental stages consistent with the three step process.

  19. Rainwater Basin Wetland Management District: Annual narrative report: 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual narrative report for Rainwater Basin WMD outlines accomplishments during the 1997 fiscal year. The report begins with a summary of the year's highlights...

  20. Rainwater Basin Wetland Management District: Annual narrative report: 2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual narrative report for Rainwater Basin WMD outlines accomplishments during the 2001 calendar year. The report begins with a summary of the year's...

  1. Keynote presentation: Project Management, Technology and Evolving Work Processes

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    Bridging the classroom and workplace is a challenge in the Project Management classroom because students rarely have the opportunity or the experience needed to head up large projects. So how can instructors present the opportunity to develop skills and gain experience needed to understand project...... management in a classroom setting? To begin to answer this question, the presentation describes three key strategies used in a Project Management course developed from a communications perspective in the International Bachelor Program in Marketing and Management Communication, Business & Social Sciences......, Aarhus University. First, this Project Management course involves continual, ongoing development through working with real clients. To learn about project management from a communications perspective, learners were asked to work in teams for project conception and planning. To communicate with the client...

  2. Inquiry into the Conceptual Dimensions of Project Portfolio Management

    Directory of Open Access Journals (Sweden)

    Pedro Bruno de Souza

    2015-01-01

    Full Text Available Although much has been written about how to manage individual projects, there is still little guidance on how to evaluate the “quality” of project portfolio management itself, that is, the degree of “accomplishment” of the process by which the project portfolio is formed and run. This study addresses this gap by employing a q ualitative approach to uncover managerial perceptions about what is encompassed by project portfolio management and how the this construct should be evaluated. By building from a review of the scant literature on project portfolio management , conversations with expert scholars on project management, interpretations provided by managers, and theoretical reflection by the authors of this study, it was possible to identify main aspects that seem to tap how the degree of “accomplishment” of project portfolio ma nagement can be conceptually defined and operationally measured.

  3. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    Science.gov (United States)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  4. An investigation of risk management strategies in projects

    Directory of Open Access Journals (Sweden)

    Zahra Asadi

    2015-06-01

    Full Text Available Risk is considered as an inseparable part of any project and since all the effective factors in projects are not predictable, risk management is inevitable. One of the biggest administrative problems with internal projects is the managers’ neglect of the importance of risk management which leads to delay in projects delivery and increase of the cost of the projects. Since not all risks are regarded as threats but also as opportunities, risk management is considered as a balance factor between the loss of threats and the profit earned through opportunities. It has focused on some strategies for successful implementation of risk management in projects as well. In the risk management, the most logical way of planning is managing risk before taking risk. This study investigated risk and risk management, its aims, components, and different stages of risk to reach the expected aims and outcomes of the study.

  5. Discussion on the Management of Collaborative Translation Project

    Institute of Scientific and Technical Information of China (English)

    陈意

    2015-01-01

    With the rapidly increasing demands for translating, the number of translation projects is soaring and the scope of the project is expending to a large extent.Therefore, collaborative translation came into fashion breeding the needs for corresponding management which alters the traditional individual translation mode.The study of translation project management becomes necessary and is of great significance to MTI students.This paper makes a discussion on the management of collaborative translation projects standing in the position of a MTI student, composed of project analyzing and planning, translators organizing, translation quality optimizing and project schedule controlling.

  6. Projected oriented organizations as development of enterprise management methods

    Directory of Open Access Journals (Sweden)

    S.I. Pavlova

    2016-12-01

    Full Text Available Dynamic external environment, significant shortage of product life cycle, increase of product technological difficulty, extension of innovative knowledge motivates managers to look for and use in their activities keys that will provide constant, stable development of organizational structures. The methodology of project enterprise management meets the requirements of «preservation through development». The articles researches the integration of methods and procedures of project management into the enterprise management system. Project management philosophy is the efficient way of existence in the competitive environment and the means for internal development of a company. The author conducts an analysis, determines the essence and peculiarities of a project-oriented enterprise, performs comparing characteristics of functional and project management, describes the stages of gradual transformation of an enterprise organizational structure into a project-oriented one. It is defined that a project-oriented enterprise is that one which functions on the base of innovative development and are scientific, creative and widely use the project activity as the means of a steady development. The article describes internal and external instruments of project management, base knowledge systems on project management and possibilities of enterprises on audit of state of system project management in an enterprise according to the IPMA certification program on the territory of Ukraine.

  7. PECULIARITIES OF ASSESSMENT AND RISK MANAGEMENT IN INNOVATIVE PROJECTS

    Directory of Open Access Journals (Sweden)

    Victor V. Guzhov

    2014-01-01

    Full Text Available The methodological and methodicalbases of risk management in innovativeprojects. Classification of risks. Types of risks depending on the stage of realizationof the innovative project. Investigated thefactors contributing to the emergence ofrisk situations. The basic techniques of risk management of innovation projects.Proposed criteria for the choice of the innovative project to implement in the realsector of the economy.

  8. Building an Experiential Learning Model for a Project Management Course

    Science.gov (United States)

    Chen, Kuan C.; Chuang, Keh-Wen

    2009-01-01

    Teaching students to become project management professionals requires a real world experience. Incorporating live clients into student projects, instead of using case studies or mock companies, adds a dimension that exposes students to the realities of project management. This paper will describe a structured methodology used in a project…

  9. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  10. An Examination of Assistant Professors' Project Management Practices

    Science.gov (United States)

    Alpert, Shannon Atkinson; Hartshorne, Richard

    2013-01-01

    Purpose: The purpose of this research was to identify factors that influence the use of project management in higher education research projects by investigating the project management practices of assistant professors. Design/methodology/approach: Using a grounded theory approach that included in-depth, semi-structured interviews with 22…

  11. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  12. How Configuration Management Helps Projects Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  13. Sustainability in projects requires training in managing as designing

    NARCIS (Netherlands)

    Lousberg, L.H.M.J.; Heintz, J.L.; Prins, M.

    2015-01-01

    Problems that present project managers have to deal with are more and more concerning complexity, i.e. unexpected, uncertain, unstable or unique situations. This seems also the case with sustainable building projects. It is therefore necessary that project managers are trained to deal with these pro

  14. The implementation of sustainability principles in project management

    NARCIS (Netherlands)

    Goedknegt, Debby; Silvius, Gilbert

    2012-01-01

    It is becoming clear that the project management practice must embrace sustainability in order to develop into a 'true profession' (Silvius et al., 2012). In project management, sustainability can be gained in both the product of the project and in the process of delivering the product. (Gareis et a

  15. BUSINESS PROCESS MODELLING FOR PROJECTS COSTS MANAGEMENT IN AN ORGANIZATION

    Directory of Open Access Journals (Sweden)

    PĂTRAŞCU AURELIA

    2014-05-01

    Full Text Available Using Information Technologies in organizations represents an evident progress for company, money economy, time economy and generates value for the organization. In this paper the author proposes to model the business processes for an organization that manages projects costs, because modelling is an important part of any software development process. Using software for projects costs management is essential because it allows the management of all operations according to the established parameters, the management of the projects groups, as well as the management of the projects and subprojects, at different complexity levels.

  16. Modeling of basin-wide water management for dry-season paddy irrigation with large reservoirs in the Mekong River Basin

    Science.gov (United States)

    Kudo, R.; Masumoto, T.; Horikawa, N.; Yoshida, T.

    2012-12-01

    Northeast Thailand, one of the regions in the Mekong River Basin, has less rainfall than adjacent countries and its rainfall is heavily concentrated in rainy seasons (almost 90% of annual rainfall). Therefore, this area is characterized as semi-arid region especially during dry seasons. In this region, rain-fed paddies account for about 90% and this leads to unstable rice production. Against these backgrounds, a number of large irrigation projects have been carried out since the 1970s to increase agricultural productivity. In these projects, a lot of irrigation facilities such as large/medium reservoirs, diversion weirs and irrigation canals were constructed for stable water supply in dry seasons. These projects enable farmers to pursue double rice cropping as rainy- and dry-season cropping in this region. Paddy field irrigation, however, exerts a great influence on water circulation of river basins in Monsoon Asia and modeling of these processes is crucial to understand the hydrological cycle especially in areas where irrigated agriculture is dominant. In this study, to quantify the hydrological cycle in irrigation-dominant basins, we applied a distributed hydrological model incorporating paddy irrigation schemes to the Mun River Basin, one of the tributaries of the Mekong River, in Northeast Thailand, and analyzed water circulation considering complex water use by agricultural activities. The model used in this study consists of four sub-models, such as referential evapotranspiration, cropping pattern/area, agricultural water use, and runoff model in order to estimate various information on agricultural water use. Additionally, water allocation and reservoir operation models were integrated into the hydrological model to account for the water circulation in large irrigation areas. For the analysis, the basin is divided into 10km-mesh and each mesh contains the ratio of 5 land-use category as forest, rain-fed paddy, irrigated paddy, upland field and water area

  17. Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance

    2003-08-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream

  18. Advanced Hybrid Particulate Collector Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  19. Integrating configuration workflows with project management system

    Science.gov (United States)

    Nilsen, Dimitri; Weber, Pavel

    2014-06-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  20. Risk Management Adoption Framework for Software Projects: A Case Study for Kenyan Software Project Managers and Developers

    Directory of Open Access Journals (Sweden)

    Noela Jemutai Kipyegen

    2012-05-01

    Full Text Available Despite the existence and availability of proper software development risk management processes, Kenyans software projects experience myriad of challenges. This study looks at software risk management practice and the root of problems experienced by Kenyan software project managers and developers. The survey helped to understand these causes and the kind of risk management adoption framework suitable to software projects and that solves existing problems in Kenya. Results from 62 software developers and 15 IT project managers from 30 software development firms showed that majority (87% of IT project managers and developers do not use formal risk management techniques. There are no measures put in place by various development organizations for the implementation of formal risk management methods. This paper develops a framework that guides in the adoption of the existing formal risk management techniques in two areas; Institutions of learning and software development industry.

  1. Managing project interdependencies in IT/IS project portfolios: a review of managerial issues

    Directory of Open Access Journals (Sweden)

    Sameer Bathallath

    2016-01-01

    Full Text Available Adequately managing project interdependencies among diverse and simultaneous projects is deemed critical for successful implementation of project portfolios. The challenge is significant because it may entail managing a complex network of project interdependencies that keeps changing over time. The present study investigates the managerial challenges that may undermine effective management of project interdependencies in IT/IS project portfolios. The investigation is based on evidence from reviewing relevant literature and documented studies associated with managing project interdependencies. The main contribution of this study is to discuss three managerial challenges of project interdependencies in project portfolios. We discuss the challenges from three perspectives: types of interdependencies; patterns of interaction in interdependencies; and cost/benefit impact of project interdependencies.

  2. Complexity management in projects between rational momentum and complex conditions

    DEFF Research Database (Denmark)

    Mac, Anita; Schlamovitz, Jesper

    This study takes its departure in a model of complexity, developed by Stacey (1993), to test and discuss its practical benefit as perceived by practicing project managers. Based on a survey, the study finds that complexity is a phenomenon recognized by project managers, and complexity management...... is associated with benefits in the development of tasks and managing stakeholders. It is also associated with some difficulty in terms of an increased need for dialogue and a risk of creating goal ambiguity. Based on the findings, we conclude that classical project management approaches can benefit from...... incorporating complexity management....

  3. Complexity Management In Projects Between Rational Momentum And Complex Conditions

    DEFF Research Database (Denmark)

    Mac, Anita; Schlamovitz, Jesper

    2015-01-01

    Abstract: This study takes its departure in a model of complexity, developed by Stacey (1993), to test and discuss its practical benefit as perceived by practicing project managers. Based on a survey, the study finds that complexity is a phenomenon recognized by project managers, and complexity...... management is associated with benefits in the development of tasks and managing stakeholders. It is also associated with some difficulty in terms of an increased need for dialogue and a risk of creating goal ambiguity. Based on the findings, we conclude that classical project management approaches can...... benefit from incorporating complexity management....

  4. Software Support for the Classical, Contemporary and Future Project Management

    Directory of Open Access Journals (Sweden)

    Jakov Crnkovic

    2006-04-01

    Full Text Available The volume and complexity of Project Management (PM raises many questions for managers. What exactly are we managing? People? Performance? Efficiency? Effectiveness? Cost? Time? At what levels do projects become challenging and worthy of significant management attention? Can some projects be left on auto-pilot? Must others be managed more aggressively? What metrics are useful in Project Management? How can they be integrated with normal performance metrics in the organization? How can metrics be built into assessment programs that work? How can projects be monitored, re-planned to stay within the original budget and schedule deadlines? How good is the PM software support? Do we really need PM software packages or it should be the integral part of the company's information system (IS? Where is the knowledge about company's previous projects and performance? Are we able to establish company or even industry wide standards for project management? Can we (or should we move from the PMBOK® guidelines and use other approaches? We discussing important questions in PM: software products, responsibilities for concurrently executing several projects (multi-projects with multi objectives and multiple deadlines, introducing a need for initiation, design, execution, and control using a virtual project management and application of the organizational project maturity model.

  5. Geothermal aquaculture project: Real Property Systems Inc. , Harney Basin, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-14

    Real Property Systems Inc., (RPS) owns two parcels in the vicinity of Harney Lake, Oregon. One parcel is 120 acres in size, the other is 200 acres. A study concludes that the 200 acre parcel has the greater potential for geothermal development. RPS is interested in an aquaculture operation that produces fresh water prawns, (Macrobrachium rosenbergii) for the market. To supply the heat necessary to maintain the ideal temperature of 82/sup 0/F desired for these prawns, a geothermal resource having a 150/sup 0/F temperature or higher, is needed. The best estimate is that 150/sup 0/F water can be found from a minimum 1090 feet depth to 2625 feet, with no absolute assurances that sufficient quantities of geothermal waters exist without drilling for the same. This study undertakes the preliminary determination of project economics so that a decision can be made whether or not to proceed with exploratory drilling. The study is based on 10 acres of ponds, with a peak requirement of 2500 gpm of 150/sup 0/F geothermal water.

  6. How Agile Methods Inspire Project Management - The Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and are today highly implemented in practice. Observations of general project management practice show how it has been inspired by agile software development......, but very little research addresses the issue of agile project management. In order to understand and to provide suggestions for future practice on how agility can be incorporated in general project management, this paper provides an analysis which compares ten characteristics of agile software development...... (identified in theory) and the Half Double Methodology developed by the Danish Project Half Double initiative; a Methodology developed with practitioners and tested in seven Danish case companies. The analysis shows how the general project management to a great extent has been inspired by agile methods...

  7. A Case-Based System for Construction Project Risk Management

    Institute of Scientific and Technical Information of China (English)

    YANG Lan-rong; ZHANG Jin-long

    2002-01-01

    This paper presents a Case-Based system for assisting construction project managers in identifying risk factors and the corresponding construction project risk. The construction project risk identification model captures the case, acquired from previous completed construction projects and experience. A prototype is developed based on the proposed Case-Based system to determine risk factors along with their risk effects.

  8. A Novel Project Management Theory and Its Applicability

    Science.gov (United States)

    2008-03-01

    63 Table 8. F-16 Project Highest Level Activity / Entity List .................................. 68 Table 9. MSIP Stage II Activity / Entity List...75 Table 10. MSIP Stage II Decisions Table...OpenProj OpenProj is a free open source alternative for MS Project. OpenProj provide tools for a project manager to plan and control a project. Gantt Charts

  9. The Convergence of Heat, Groundwater & Fracture Permeability. Innovative Play Fairway Modelling Applied to the Tularosa Basin Phase 1 Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Carlon R. [Ruby Mountain Inc., Salt Lake City, UT (United States); Nash, Gregory D. [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Sorkhabi, Rasoul [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Brandt, Adam [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Barker, Benjamin [Univ. of Utah, Salt Lake City, UT (United States). Energy & Geoscience Institute; Swanson, Brigitte [Ruby Mountain Inc., Salt Lake City, UT (United States)

    2015-10-16

    This report summarizes the activities and key findings of the project team occurring during Phase 1 (August 2014-October 2015) of the Tularosa Basin Geothermal Play Fairway Analysis Project. The Tularosa Basin Play Fairway Analysis (PFA) project tested two distinct geothermal exploration methodologies covering the entire basin within South Central New Mexico and Far West Texas. Throughout the initial phase of the project, the underexplored basin proved to be a challenging, yet ideal test bed to evaluate effectiveness of the team’s data collection techniques as well as the effectiveness of our innovative PFA. Phase 1 of the effort employed a low-cost, pragmatic approach using two methods to identify potential geothermal plays within the study area and then compared and contrasted the results of each method to rank and evaluate potential plays. Both methods appear to be very effective and highly transferable to other areas.

  10. 18th International Congress on Project Management and Engineering

    CERN Document Server

    Blanco, José; Capuz-Rizo, Salvador

    2016-01-01

    This volume features papers from the 18th International Congress on Project Management and Engineering, held by the University of Zaragoza in collaboration with the Spanish Association of Project Management and Engineering (AEIPRO). It illustrates the state of the art in this emerging area. Readers will discover ways to increase the effectiveness of project engineering as well as the efficiency of project management. The papers, written by international researchers and professionals, cover civil engineering and urban planning, product and process engineering, environmental engineering, energy efficiency and renewable energies, rural development, safety, labor risks and ergonomics, and training in project engineering. Overall, this book contributes to the improvement of project engineering research and enhances the transfer of results to the job of project engineers and project managers around the world. It will appeal to all professionals in the field as well as researchers and teachers involved in the traini...

  11. The Narew River Basin: A model for the sustainable management of agriculture, nature and water supply

    NARCIS (Netherlands)

    Gielczewski, Marek

    2003-01-01

    This thesis is a search for a method of environmental management that may lead to sustainable development in North-eastern Poland and the Warsaw region. The methods studied in this thesis provide the components of a decision support system for managing the water quality of the Narew River Basin. The

  12. Probabilistic projections of regional climatic changes over the Great Lakes Basin

    Science.gov (United States)

    Wang, Xiuquan; Huang, Guohe; Baetz, Brian W.; Zhao, Shan

    2016-11-01

    As the largest surface fresh water system on earth, the Great Lakes is facing the threat of climate change. Understanding how the hydrologic cycle in the Great Lakes region would be affected by human-induced global warming is important for developing informed adaptation strategies. In this study, high-resolution regional climate ensemble simulations based upon the PRECIS modeling system are conducted to project future climatic changes over the Great Lakes Basin. The results show that the Great Lakes Basin is very likely to experience a continuous warming-up throughout the 21st century. Particularly, mean air temperatures will rise by 2.6 °C in the forthcoming decades (i.e., 2030s), 3.8 °C in the middle of the century (i.e., 2050s), and 5.6 °C to the end of the century (i.e., 2080s), respectively. The warming air temperatures are very likely to result in more precipitation over the entire basin. The annual total precipitation over the Great Lakes Basin is projected to increase by 8.9% in the 2030s and 12.2% in the 2050s, while the magnitude of precipitation increase would decline to 7.1% in the 2080s. The slow-down of the precipitation increase from the 2050s to the 2080s indicates a shift from the aggressive increase of precipitation before and in the middle of this century to the eventual decrease by the end of this century, suggesting that a nonlinear response relationship between precipitation and temperature may exist in the Great Lakes Basin and such a relationship is also likely to vary in response to global warming.

  13. Projected hydrologic regime changes in the Poyang Lake Basin due to climate change

    Science.gov (United States)

    Wang, Le; Guo, Shenglian; Hong, Xingjun; Liu, Dedi; Xiong, Lihua

    2016-09-01

    Poyang Lake, the largest freshwater lake in China, and its surrounding sub-basins have suffered frequent floods and droughts in recent decades. To better understand and quantitatively assess hydrological impacts of climate change in the region, this study adopted the Statistical Downscaling Model (SDSM) to downscale the outputs of a Global Climate Model (GCM) under three scenarios (RCP2.6, RCP4.5 and RCP8.5) as recommended by the fifth phase of the Coupled Model Inter-comparison Project (CMIP5) during future periods (2010‒2099) in the Poyang Lake Basin. A semi-distributed two-parameter monthly water balance model was also used to simulate and predict projected changes of runoff in the Ganjiang sub-basin. Results indicate that: 1) SDSM can simulate monthly mean precipitation reasonably well, while a bias correction procedure should be applied to downscaled extreme precipitation indices (EPI) before being employed to simulate future precipitation; 2) for annual mean precipitation, a mixed pattern of positive or negative changes are detected in the entire basin, with a slightly higher or lower trend in the 2020s and 2050s, with a consistent increase in the 2080s; 3) all six EPI show a general increase under RCP4.5 and RCP8.5 scenarios, while a mixed pattern of positive and negative changes is detected for most indices under the RCP2.6 scenario; and 4) the future runoff in the Ganjiang sub-basin shows an overall decreasing trend for all periods but the 2080s under the RCP8.5 scenario when runoff is more sensitive to changes in precipitation than evaporation.

  14. Projected hydrologic regime changes in the Poyang Lake Basin due to climate change

    Science.gov (United States)

    Wang, Le; Guo, Shenglian; Hong, Xingjun; Liu, Dedi; Xiong, Lihua

    2017-03-01

    Poyang Lake, the largest freshwater lake in China, and its surrounding sub-basins have suffered frequent floods and droughts in recent decades. To better understand and quantitatively assess hydrological impacts of climate change in the region, this study adopted the Statistical Downscaling Model (SDSM) to downscale the outputs of a Global Climate Model (GCM) under three scenarios (RCP2.6, RCP4.5 and RCP8.5) as recommended by the fifth phase of the Coupled Model Inter-comparison Project (CMIP5) during future periods (2010‒2099) in the Poyang Lake Basin. A semi-distributed two-parameter monthly water balance model was also used to simulate and predict projected changes of runoff in the Ganjiang sub-basin. Results indicate that: 1) SDSM can simulate monthly mean precipitation reasonably well, while a bias correction procedure should be applied to downscaled extreme precipitation indices (EPI) before being employed to simulate future precipitation; 2) for annual mean precipitation, a mixed pattern of positive or negative changes are detected in the entire basin, with a slightly higher or lower trend in the 2020s and 2050s, with a consistent increase in the 2080s; 3) all six EPI show a general increase under RCP4.5 and RCP8.5 scenarios, while a mixed pattern of positive and negative changes is detected for most indices under the RCP2.6 scenario; and 4) the future runoff in the Ganjiang sub-basin shows an overall decreasing trend for all periods but the 2080s under the RCP8.5 scenario when runoff is more sensitive to changes in precipitation than evaporation.

  15. The IRETHERM Project: Assessment Of The Rathlin Basin As A Possible Geothermal Aquifer

    Science.gov (United States)

    Delhaye, R. P.; Jones, A. G.; Brown, C.; Reay, D.

    2013-12-01

    IRETHERM (www.iretherm.ie) is a collaborative, SFI-funded research project to identify and evaluate sites within Ireland possessing the greatest potential for deep, low-enthalpy, geothermal energy provision. Geothermal aquifers, which might host such resources and that will be evaluated over the next three years, are found within relatively high primary and/or secondary porosity media, with viability depending largely on the permeability distribution which controls fluid flow and heat-exchange. Promising primary-porosity targets are located in the Permo-Triassic sedimentary basins of Northern Ireland and include the Triassic Sherwood Sandstone Group (measured porosities and permeabilities of 8-24% and 2-1000 mD respectively in borehole core samples). The subject of the work presented here, the Rathlin Basin in Co. Antrim, is one such basin, where measurements in two independent boreholes show geothermal gradients of between 36 and 43 °C/km to depths of 1481 m. Previously published interpretations of gravity models across the basin attribute a thickness of 2000 m to the Sherwood Sandstone Group, with a maximum depth to the Permo-Triassic basement of 4000 m. Magnetotelluric data were acquired onshore in June 2012 across a 2-D grid of 57 sites with a 2 km site spacing in June 2012, and on the nearby Rathlin Island in two profiles totalling 12 sites with an 800 m site spacing in April 2013 in order to image the thickness and continuity of the sediments in the north-eastern portion of the basin. In the modelling results presented here, the Permo-Triassic sediment fill has a well-imaged resistivity contrast to the surrounding basal Dalradian metasediments. The data have been analysed and modelled to determine a model that maps the variation in thickness of the sediment fill and the truncation of the basin sediments against the Tow Valley Fault.

  16. USE THE METHOD OF DIMENSIONING OF INFILTRATION-RETENTION BASINS FOR MANAGEMENT OF RAINWATER

    Directory of Open Access Journals (Sweden)

    Ewa Suchanek

    2015-01-01

    Full Text Available The easiest way to “use” rainwater is its detention in places where it falls, and referral to the ground. Systems of rainwater utilization system can be implemented in different variants. In the simplest configuration it is a tank, with a runoff from the roof. The principle of operation of the tank (basin is a method for rain water management. The article presents a practical application of methods of dimensioning infiltration basins by performing calculations showing how to alter the dimensions of the basin when changing the ground conditions while maintaining the same filling.

  17. Post conflict water management: learning from the past for recovery planning in the Orontes River basin

    OpenAIRE

    Saadé-Sbeih, Myriam; Zwahlen, François; Haj Asaad, Ahmed; Gonzalez, Raoul; Jaubert, Ronald

    2016-01-01

    Water management is a fundamental issue in post-conflict planning in Syria. Based on historical water balance assessment, this study identifies the drivers of the profound changes that took place in the Lebanese and Syrian parts of the Orontes River basin since the 1930s. Both drastic effects of the conflict on the hydro-system and the strong uncontrolled anthropization of the river basin prior to the crisis have to be considered in the design of recovery interventions.

  18. Post conflict water management: learning from the past for recovery planning in the Orontes River basin

    Science.gov (United States)

    Saadé-Sbeih, Myriam; Zwahlen, François; Haj Asaad, Ahmed; Gonzalez, Raoul; Jaubert, Ronald

    2016-10-01

    Water management is a fundamental issue in post-conflict planning in Syria. Based on historical water balance assessment, this study identifies the drivers of the profound changes that took place in the Lebanese and Syrian parts of the Orontes River basin since the 1930s. Both drastic effects of the conflict on the hydro-system and the strong uncontrolled anthropization of the river basin prior to the crisis have to be considered in the design of recovery interventions.

  19. A SYSTEMATIC REVIEW OF UNCERTAINTIES IN SOFTWARE PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Marcelo Marinho

    2014-12-01

    Full Text Available It is no secret that many projects fail, regardless of the business sector, software projects are notoriously disaster victims, not necessarily because of technological failure, but more often due to their uncertainties. The threats identified by uncertainty in day-to-day of a project are real and immediate and the stakes in a project are often high. This paper presents a systematic review about software project management uncertainties. It helps to identify the difficulties and the actions that can minimize the uncertainties effects in the projects and how managers and teams can prepare themselves for the challenges of their projects scenario, with the aim of contributing to the improvement of project management in organizations as well as contributing to project success

  20. Managing the continuum certainty, uncertainty, unpredictability in large engineering projects

    CERN Document Server

    Caron, Franco

    2013-01-01

    The brief will describe how to develop a risk analysis applied to a project , through a sequence of steps: risk management planning, risk identification, risk classification, risk assessment, risk quantification, risk response planning, risk monitoring and control, process close out and lessons learning. The project risk analysis and management process will be applied to large engineering projects, in particular related to the oil and gas industry. The brief will address the overall range of possible events affecting the project moving from certainty (project issues) through uncertainty (project risks) to unpredictability (unforeseeable events), considering both negative and positive events. Some quantitative techniques (simulation, event tree, Bayesian inference, etc.) will be used to develop risk quantification. The brief addresses a typical subject in the area of project management, with reference to large engineering projects concerning the realization of large plants and infrastructures. These projects a...

  1. Modeling Climate and Management Change Impacts on Water Quality and In-Stream Processes in the Elbe River Basin

    Directory of Open Access Journals (Sweden)

    Cornelia Hesse

    2016-01-01

    Full Text Available Eco-hydrological water quality modeling for integrated water resources management of river basins should include all necessary landscape and in-stream nutrient processes as well as possible changes in boundary conditions and driving forces for nutrient behavior in watersheds. The study aims to assess possible impacts of the changing climate (ENSEMBLES climate scenarios and/or land use conditions on resulting river water quantity and quality in the large-scale Elbe river basin by applying a semi-distributed watershed model of intermediate complexity (SWIM with implemented in-stream nutrient (N+P turnover and algal growth processes. The calibration and validation results revealed the ability of SWIM to satisfactorily simulate nutrient behavior at the watershed scale. Analysis of 19 climate scenarios for the whole Elbe river basin showed a projected increase in temperature (+3 °C and precipitation (+57 mm on average until the end of the century, causing diverse changes in river discharge (+20%, nutrient loads (NO3-N: −5%; NH4-N: −24%; PO4-P: +5%, phytoplankton biomass (−4% and dissolved oxygen concentration (−5% in the watershed. In addition, some changes in land use and nutrient management were tested in order to reduce nutrient emissions to the river network.

  2. Pechora River basin integrated system management PRISM; biodiversity assessment for the Pechora River basin; Cluster B: biodiversity, land use & forestry modeling

    NARCIS (Netherlands)

    Sluis, van der T.

    2005-01-01

    This report describes the biodiversity for the Pechora River basin Integrated System Management (PRISM). The Pechora River Basin, situated just west of the Ural Mountains, Russia, consists of vast boreal forests and tundra landscapes, partly pristine and undisturbed. The concept of biodiversity is d

  3. Managing aquatic ecosystems and water resources under multiple stress--an introduction to the MARS project.

    Science.gov (United States)

    Hering, Daniel; Carvalho, Laurence; Argillier, Christine; Beklioglu, Meryem; Borja, Angel; Cardoso, Ana Cristina; Duel, Harm; Ferreira, Teresa; Globevnik, Lidija; Hanganu, Jenica; Hellsten, Seppo; Jeppesen, Erik; Kodeš, Vit; Solheim, Anne Lyche; Nõges, Tiina; Ormerod, Steve; Panagopoulos, Yiannis; Schmutz, Stefan; Venohr, Markus; Birk, Sebastian

    2015-01-15

    Water resources globally are affected by a complex mixture of stressors resulting from a range of drivers, including urban and agricultural land use, hydropower generation and climate change. Understanding how stressors interfere and impact upon ecological status and ecosystem services is essential for developing effective River Basin Management Plans and shaping future environmental policy. This paper details the nature of these problems for Europe's water resources and the need to find solutions at a range of spatial scales. In terms of the latter, we describe the aims and approaches of the EU-funded project MARS (Managing Aquatic ecosystems and water Resources under multiple Stress) and the conceptual and analytical framework that it is adopting to provide this knowledge, understanding and tools needed to address multiple stressors. MARS is operating at three scales: At the water body scale, the mechanistic understanding of stressor interactions and their impact upon water resources, ecological status and ecosystem services will be examined through multi-factorial experiments and the analysis of long time-series. At the river basin scale, modelling and empirical approaches will be adopted to characterise relationships between multiple stressors and ecological responses, functions, services and water resources. The effects of future land use and mitigation scenarios in 16 European river basins will be assessed. At the European scale, large-scale spatial analysis will be carried out to identify the relationships amongst stress intensity, ecological status and service provision, with a special focus on large transboundary rivers, lakes and fish. The project will support managers and policy makers in the practical implementation of the Water Framework Directive (WFD), of related legislation and of the Blueprint to Safeguard Europe's Water Resources by advising the 3rd River Basin Management Planning cycle, the revision of the WFD and by developing new tools for

  4. A study of project management knowledge and sustainable outcomes in Thailand’s reproductive health projects

    Directory of Open Access Journals (Sweden)

    Jantanee Dumrak

    2015-05-01

    Full Text Available In Thailand, numerous reproductive health projects funded by both national and international agencies have been established in an attempt to mitigate reproductive health problems. Solving problems on reproductive health projects that only have temporary funding requires effective project management that hopefully leads to better long-term desired outcomes. This paper identifies the association between collaborative reproductive health (CRH project management and sustainable outcomes. The Guide to the Project Management Body of Knowledge (PMBOK® Guide is employed to benchmark project management practices on four CRH projects in Thailand. The research methodology presented in this paper comprises of content analysis and questionnaire survey. It is evident that limited use of certain project management knowledge areas (PMKAs affects CRH project implementation and success. The association between the use of PMKAs and sustainable outcomes on these projects is also presented. Scope, integration and quality management were found to be the most influential PMKAs for sustainable outcomes on CRH projects. Nevertheless, the projects showed a shortage of project management processes for PMKAs that were required to attain the outcomes.

  5. Critical evaluation of project manager's competency standard for proposing a comprehensive model

    OpenAIRE

    Ghasem Omidvar; ZULKIFLEE BIN ABDUL SAMAD; SOMAYE FATTAHI ZAFARGHANDI

    2011-01-01

    Identifying and developing project manager’s competency is becoming more and more important in a today competitive market. This importance also has absorbed the attention of main project management institutions such as Project Management Institute (PMI), Association for Project Management (APM), International Project Management Association (IPMA), and Australian institute of Project management (AIPM). These project management organizations in order to address the importance of project manager...

  6. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  7. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  8. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME). Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.

  9. Requirements engineering and management for software development projects

    CERN Document Server

    Chemuturi, Murali

    2012-01-01

    Requirements Engineering and Management for Software Development Projects presents a complete guide on requirements for software development including engineering, computer science and management activities. It is the first book to cover all aspects of requirements management in software development projects. This book introduces the understanding of the requirements, elicitation and gathering, requirements analysis, verification and validation of the requirements, establishment of requirements, different methodologies in brief, requirements traceability and change management among other topic

  10. Status and understanding of groundwater quality in the South Coast Interior groundwater basins, 2008: California GAMA Priority Basin Project

    Science.gov (United States)

    Parsons, Mary C.; Kulongoski, Justin T.; Belitz, Kenneth

    2014-01-01

    Groundwater quality in the approximately 653-square-mile (1,691-square-kilometer) South Coast Interior Basins (SCI) study unit was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The South Coast Interior Basins study unit contains eight priority groundwater basins grouped into three study areas, Livermore, Gilroy, and Cuyama, in the Southern Coast Ranges hydrogeologic province. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA South Coast Interior Basins study was designed to provide a spatially unbiased assessment of untreated (raw) groundwater quality within the primary aquifer system, as well as a statistically consistent basis for comparing water quality between basins. The assessment was based on water-quality and ancillary data collected by the USGS from 50 wells in 2008 and on water-quality data from the California Department of Public Health (CDPH) database. The primary aquifer system was defined by the depth intervals of the wells listed in the CDPH database for the SCI study unit. The quality of groundwater in the primary aquifer system may be different from that in the shallower or deeper water-bearing zones; shallow groundwater may be more vulnerable to surficial contamination. The first component of this study, the status of the current quality of the groundwater resource, was assessed by using data from samples analyzed for volatile organic compounds (VOCs), pesticides, and naturally occurring inorganic constituents, such as trace elements and minor ions. This status assessment is intended to characterize the quality of groundwater resources within the primary aquifer system of the SCI study unit, not the treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentration

  11. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  12. Understanding Extension Within a Convergent Orogen: Initial Results From the Carpathian Basins Seismic Project

    Science.gov (United States)

    Stuart, G. W.; Houseman, G.; Dando, B.; Hegedus, E.; Brueckl, E.; Radovanovic, S.; Falus, G.; Kovacs, A.; Hausmann, H.; Brisbourne, A.

    2007-12-01

    The Carpathian Basins Project (CBP) aims to understand the origin of Miocene-age extensional basins, of which the Pannonian Basin is the largest, within the arc of the Alpine-Carpathian Mountain Ranges - a compressional structure. Analysis of the subsidence history of the Pannonian Basin shows that its mantle lithosphere has undergone a much greater degree of extension than the overlying crust. We describe the results of a temporary seismic deployment to test competing theories of how the continental lithosphere evolved in the region. We deployed a 46-element seismic network, 450 km x 80 km, oriented in a NW-SE direction, crossing the Vienna and western Pannonian Basins in Austria, Hungary and Serbia. The network ran for 14 months from early May 2006. The stations were broadband to 30s and spaced at ~30 km along 3 parallel lines, which are 40 km apart. The principal object of this network is to use P and S-wave teleseismic tomography to image the upper mantle. P- wave residuals from sources perpendicular to the tectonic grain show a ~1s variation across the Mid-Hungarian High in to the Pannonian Basin. This delay cannot be explained by sedimentary or crustal thickness variations, which are well-controlled by boreholes, deep seismic soundings and our own receiver function analyses. We must infer significant lithospheric thinning and anomalously low asthenospheric velocities underlying the Pannonian Basin to explain our observations. These travel time delays are accompanied by a dramatic change in the orientation of SKS splitting measurements from E-W to NW-SE across the Mid-Hungarian High. We have also installed a more broadly distributed regional broadband array of 10 instruments (broadband to 120 sec) for 2 years from September 2005, spaced at ~100km within Hungary, Croatia and Serbia to augment the data available from permanent broadband networks in central Europe. Preliminary interstation surface wave dispersion results from across the Pannonian Basin imply

  13. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  14. Development of a regional model for integrated management of water resources at the basin scale

    Science.gov (United States)

    Gaiser, T.; Printz, A.; von Raumer, H. G. Schwarz; Götzinger, J.; Dukhovny, V. A.; Barthel, R.; Sorokin, A.; Tuchin, A.; Kiourtsidis, C.; Ganoulis, I.; Stahr, K.

    Integrated modeling is a novel approach to couple knowledge and models from different disciplines and research fields and to use their potential in the strategic planning of water management at the river basin scale. The MOSDEW integrated regional model has been developed in the Neckar basin, a 14,000 km 2 river catchment in South-West Germany as a model cascade of nine submodels covering large scale hydrology, groundwater flow, water demand, agricultural production, point and non-point pollution and chemical as well as biological water quality. The models are being tested and validated in the Neckar basin as well as in additional river basins in West Africa (Ouémé basin) and Central Asia (Chirchik-Ahangaran-Keles basin, CHAB) with contrasting ecological, hydrological and socio-economic boundary conditions. The transfer to the CHAB basin required changes in the submodel selection and integration structure due to the strong anthropogenic modifications of the flow regime in the downstream area. There, water is conveyed from the Chirchik river to other catchments and distributed in a complex channel system to satisfy the demand of competing water users (irrigation, urban water supply, energy production). In the Ouémé basin, the ecohydraulic model was not integrated due to lack of input data for ecological requirements of fish species whereas the groundwater flow model was not applicable to the predominant presence of aquifers in fractured rock. The model results obtained so far are promising with respect to their accuracy to be used in scenario simulations for the strategic basin wide planning of water management.

  15. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  16. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  17. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    Science.gov (United States)

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  18. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  19. Site response zones and short-period earthquake ground motion projections for the Las Vegas Basin

    Indian Academy of Sciences (India)

    Barbara Luke; Ying Liu

    2008-11-01

    A deterministic seismic hazard analysis was conducted to address the effect of local soil conditions on earthquake-induced strong ground motion in the Las Vegas Basin, Nevada (US). Using a large geological and geotechnical database, two response units were defined: a fine-grained unit, predominantly clay; and a coarse-grained unit, predominantly gravel. A moderate number of high-quality shallow shear wave velocity measurements were collected from which characteristic shear wave velocity profiles were developed for each response unit. An equivalent-linear one-dimensional site response model was used. The model was calibrated using a basin-wide, small-strain ground motion database. Calibration tests showed that ground motion projections become increasingly conservative with increasing ground-motion amplitude. Projections were overconservative for the coarsegrained response unit, likely due to the sparseness of the velocity database. For the earthquake response analyses, historical ground motions were used to model characteristic ‘bedrock’ motion for earthquakes on 10 faults judged to be critical. Response spectral envelopes were generated for each unit through Monte-Carlo simulations. For the fine-grained response unit, 95th percentile peak ground acceleration, peak spectral acceleration and predominant period were 310 cm/s2, 1100cm/s2, and 0.29 s, respectively. With respect to codified design spectra, projections are lower at short periods and higher at long periods. Projections of peak spectral accelerations for the coarsegrained response unit, were more than double that of codified spectra; however, they are believed to be overconservative. Near-fault effects and basin-edge effects, though potentially important, were not considered in these analyses.

  20. Managing the effects of multiple stressors on aquatic ecosystems under water scarcity. The GLOBAQUA project

    Science.gov (United States)

    Navarro-Ortega, Alícia; Acuña, Vicenç; Bellin, Alberto; Burek, Peter; Cassiani, Giorgio; Choukr-Allah, Redouane; Dolédec, Sylvain; Elosegi, Arturo; Ferrari, Federico; Ginebreda, Antoni; Grathwohl, Peter; Jones, Colin; Rault, Philippe Ker; Kok, Kasper; Koundouri, Phoebe; Ludwig, Ralf Peter; Merz, Ralf; Milacic, Radmila; Muñoz, Isabel; Nikulin, Grigory; Paniconi, Claudio; Paunović, Momir; Petrovic, Mira; Sabater, Laia; Sabaterb, Sergi; Skoulikidis, Nikolaos Th.; Slob, Adriaan; Teutsch, Georg; Voulvoulis, Nikolaos; Barceló, Damià

    2015-01-01

    Water scarcity is a serious environmental problem in many European regions, and will likely increase in the near future as a consequence of increased abstraction and climate change. Water scarcity exacerbates the effects of multiple stressors, and thus results in decreased water quality. It impacts river ecosystems, threatens the services they provide, and it will force managers and policy-makers to change their current practices. The EU-FP7 project GLOBAQUA aims at identifying the prevalence, interaction and linkages between stressors, and to assess their effects on the chemical and ecological status of freshwater ecosystems in order to improve water management practice and policies. GLOBAQUA assembles a multidisciplinary team of 21 European plus 2 non-European scientific institutions, as well as water authorities and river basin managers. The project includes experts in hydrology, chemistry, biology, geomorphology, modelling, socio-economics, governance science, knowledge brokerage, and policy advocacy. GLOBAQUA studies six river basins (Ebro, Adige, Sava, Evrotas, Anglian and Souss Massa) affected by water scarcity, and aims to answer the following questions: how does water scarcity interact with other existing stressors in the study river basins? How will these interactions change according to the different scenarios of future global change? Which will be the foreseeable consequences for river ecosystems? How will these in turn affect the services the ecosystems provide? How should management and policies be adapted to minimise the ecological, economic and societal consequences? These questions will be approached by combining data-mining, field- and laboratory-based research, and modelling. Here, we outline the general structure of the project and the activities to be conducted within the fourteen work-packages of GLOBAQUA. PMID:25005236