WorldWideScience

Sample records for basin management planning

  1. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...

  2. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia;

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  3. Rainwater Basin Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rainwater Basin Wetland Management District for the next 15 years. This plan outlines...

  4. River basin management plans for the European Water Framework Directive

    NARCIS (Netherlands)

    Kronvang, B.; Bechmann, M.; Behrendt, H.; Ruboek, G.H.; Schoumans, O.F.

    2004-01-01

    The newly adopted EU water framework directive aims at protecting different water bodies by performing impact analysis and developing river basin management plans before 2009. The adoption of management measures in river basins demands that catchment managers are able to quantify the importance of d

  5. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Science.gov (United States)

    2011-04-05

    ... Bureau of Reclamation Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement... Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project. The Washington State...; and (4) identify a comprehensive approach for efficient management of basin water supplies....

  6. Land Protection Plan: Rainwater Basin Wetland Management District Expansion

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Land Protection Plan (LLP) describes the priorities for acquiring additional acres within the boundary of the Rainwater Basin Wetland Management District. The...

  7. Black-tailed prairie dog management plan : Rainwater Basin Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan is for management of black-tailed prairie dogs on the Rainwater Basin Wetland Management District , Nebraska. A management plan is needed for...

  8. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth;

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares...... the institutional set-up, the public participation and the potentials and barriers for implementing the water plans....

  9. Integrated Pest Management Plan Rainwater Basin Wetland Management District 2004-2008

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Rainwater Basin WMD....

  10. Habitat Management Plan for Ernest F. Hollings Ace Basin National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Ernest F. Hollings Ace Basin NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  11. Developing a Science-based River Basin Management Plan for the Kharaa River Basin, Mongolia

    Science.gov (United States)

    Karthe, Daniel

    2013-04-01

    management. In the past, shared and unclear responsibilities, a spatial mismatch between administrative and river basin boundaries, the lack of relevant information, financial resources and implementation capacity resulted in an uncoordinated and partially uncontrolled exploitation of water resources (Livingstone et al. 2009; Horlemann et al. 2012). The recent decision of the Mongolian government to develop river basin management plans and to provide for their implementation through river basin councils and administrations, and the comparatively good data availability resulting from the R&D project, resulted in the decision to jointly develop a science-based river basin management plan for the KRB as a model region for other river basins of the country. References: Hartwig, M.; Theuring, P.; Rode, M. & Borchardt, D. (2012): Suspended sediments in the Kharaa River catchment (Mongolia) and its impact on hyporheic zone functions. Environmental Earth Sciences 65(5):1535-1546. Hofmann, J.; Venohr, M.; Behrendt, H. & Opitz, D. (2010): Integrated Water Resources Management in Central Asia: Nutrient and heavy metal emissions and their relevance for the Kharaa River Basin, Mongolia. Water Science and Technology 62(2):353-363. Horlemann, L. & Dombrowsky, I. (2012): Institutionalising IWRM in developing and transition countries: the case of Mongolia. Environmental Earth Sciences 65(5):1547-1559. Karthe, D.; Borchardt, D. & Hufert, F. (2012a): Implementing IWRM: Experiences from a Central Asian Model Region. In: Pandya, A.B. (Ed.) (2012): India Water Week 2012. Water, Energy and Food Security: Call for Solutions, Part A3, pp. 1-15. Delhi: Ministry of Water Resources, Government of India. Karthe, D.; Sigel, K.; Scharaw, B. et al. (2012b): Towards an integrated concept for monitoring and improvements in water supply, sanitation and hygiene (WASH) in urban Mongolia. Water & Risk 20:1-5. Karthe, D.; Malsy, M.; Kopp, B. & Minderlein, S. (2013): Assessing Water Availibility and its Drivers in

  12. Rainwater Basin Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  13. Post conflict water management: learning from the past for recovery planning in the Orontes River basin

    OpenAIRE

    Saadé-Sbeih, Myriam; Zwahlen, François; Haj Asaad, Ahmed; Gonzalez, Raoul; Jaubert, Ronald

    2016-01-01

    Water management is a fundamental issue in post-conflict planning in Syria. Based on historical water balance assessment, this study identifies the drivers of the profound changes that took place in the Lebanese and Syrian parts of the Orontes River basin since the 1930s. Both drastic effects of the conflict on the hydro-system and the strong uncontrolled anthropization of the river basin prior to the crisis have to be considered in the design of recovery interventions.

  14. Post conflict water management: learning from the past for recovery planning in the Orontes River basin

    Science.gov (United States)

    Saadé-Sbeih, Myriam; Zwahlen, François; Haj Asaad, Ahmed; Gonzalez, Raoul; Jaubert, Ronald

    2016-10-01

    Water management is a fundamental issue in post-conflict planning in Syria. Based on historical water balance assessment, this study identifies the drivers of the profound changes that took place in the Lebanese and Syrian parts of the Orontes River basin since the 1930s. Both drastic effects of the conflict on the hydro-system and the strong uncontrolled anthropization of the river basin prior to the crisis have to be considered in the design of recovery interventions.

  15. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  16. Vodno načrtovanje in načrti upravljanja voda = Water planning and river basin management plans

    Directory of Open Access Journals (Sweden)

    Aleš Bizjak

    2008-01-01

    Full Text Available Directive 2000/60/EC – Water framework directive – is a milestone in history of waterpolicies in Europe. The Directive establishes a common framework for sustainable andintegrated management of all European surface and groundwaters, taking into accountall anthropogenic impact factors as well as economic implications of the preventive andsanitation measures. The ultimate objective of the Directive is to achieve good status of allwaters in the EU member states by the year 2015, with exemptions by 2021 or latest by 2027.The cornerstone of the Directive is the demand for integration and application of integratedwater management approach through the river basin management plans as well as publicparticipation and involvement.

  17. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  18. Risk management frameworks: supporting the next generation of Murray-Darling Basin water sharing plans

    Science.gov (United States)

    Podger, G. M.; Cuddy, S. M.; Peeters, L.; Smith, T.; Bark, R. H.; Black, D. C.; Wallbrink, P.

    2014-09-01

    Water jurisdictions in Australia are required to prepare and implement water resource plans. In developing these plans the common goal is realising the best possible use of the water resources - maximising outcomes while minimising negative impacts. This requires managing the risks associated with assessing and balancing cultural, industrial, agricultural, social and environmental demands for water within a competitive and resource-limited environment. Recognising this, conformance to international risk management principles (ISO 31000:2009) have been embedded within the Murray-Darling Basin Plan. Yet, to date, there has been little strategic investment by water jurisdictions in bridging the gap between principle and practice. The ISO 31000 principles and the risk management framework that embodies them align well with an adaptive management paradigm within which to conduct water resource planning. They also provide an integrative framework for the development of workflows that link risk analysis with risk evaluation and mitigation (adaptation) scenarios, providing a transparent, repeatable and robust platform. This study, through a demonstration use case and a series of workflows, demonstrates to policy makers how these principles can be used to support the development of the next generation of water sharing plans in 2019. The workflows consider the uncertainty associated with climate and flow inputs, and model parameters on irrigation and hydropower production, meeting environmental flow objectives and recreational use of the water resource. The results provide insights to the risks associated with meeting a range of different objectives.

  19. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  20. Construction and evaluation of a Toolbox for the formulation of the Hydrologic component of the Basin Management Plans in Colombia

    Science.gov (United States)

    Garzón, Victor H.; Garzón, Ricardo; Avellaneda, Pedro M.; Rodríguez, Erasmo A.; Alfonso, Leonardo

    2016-10-01

    The Colombian Ministry of Environment, Housing and Territorial Development issued the Policy for Integrated Water Resources Management in 2010, with the formulation of Basin Management Plans (POMCA) as a key component. The main purpose of these plans is to support land use planning and sustainable management of renewable natural resources. Since the announcement of the policy; however, advances in the formulation of POMCAs have been limited, due to the need of generating knowledge and the necessary information to formulate such plans. To contribute to the generation of such knowledge, we developed HidroCHEP: a Toolbox to support the formulation and hydrologic characterization of Colombian basins. In this paper, we report the design, architecture, implementation and use of the toolbox, to understand the climatic variability of the country and to improve predictions in ungauged basins. The use of the toolbox is illustrated and evaluated through its application in three pilot river basins (Pamplonita, Gualí and Ceibas) each with different level of available hydrologic and climatic data. This paper focuses on the use of the toolbox for the development of one of the products required by the technical guide for the formulation of POMCA, in the Pamplonita river basin. Main advantages and disadvantages of its application are evaluated. It is demonstrated that the toolbox has the potential to support the formulation of POMCAs in the country and to contribute to integrated national water resources management.

  1. Lessons learned from the preparation of the flood risk management plans on the Seine basin and perspectives

    Directory of Open Access Journals (Sweden)

    Dupray Sébastien

    2016-01-01

    Full Text Available The present paper presents how the flood directive has been implemented on the Seine and coastal rivers of Normandy basin. It presents the various steps and details the elaboration of the basin flood risk management plan (PGRI. Though out of the scope of the present paper, the new responsibility in term of flood prevention given to local authorities will be briefly introduced and discussed with reference to the implementation of the flood directive.

  2. Tulare Basin protection plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tulare Basin Protection Plan has been initiated by The Nature Conservancy to elucidate the problems and opportunities of natural diversity protection....

  3. Watershed Planning Basins

    Data.gov (United States)

    Vermont Center for Geographic Information — The Watershed Planning Basin layer is part of a larger dataset contains administrative boundaries for Vermont's Agency of Natural Resources. The dataset includes...

  4. An agent-based model for water management and planning in the Lake Naivasha basin, Kenya

    Science.gov (United States)

    van Oel, Pieter; Mulatu, Dawit; Odongo, Vincent; Onyando, Japheth; Becht, Robert; van der Veen, Anne

    2013-04-01

    A variety of human and natural processes influence the ecological and economic state of the Lake Naivasha basin. The ecological wealth and recent economic developments in the area are strongly connected to Lake Naivasha which supports a rich variety of flora, mammal and bird species. Many human activities depend on clean freshwater from the lake whereas recently the freshwater availability of good quality is seriously influenced by water abstractions and the use of fertilizers in agriculture. Management alternatives include those aiming at limiting water abstractions and fertilizer use. A possible way to achieve reduced use of water and fertilizers is the introduction of Payment for Environmental Services (PES) schemes. As the Lake Naivasha basin and its population have experienced increasing pressures various disputes and disagreements have arisen about the processes responsible for the problems experienced, and the effectively of management alternatives. Beside conflicts of interest and disagreements on responsibilities there are serious factual disagreements. To share scientific knowledge on the effects of the socio-ecological system processes on the Lake Naivasha basin, tools may be used that expose information at temporal and spatial scales that are meaningful to stakeholders. In this study we use a spatially-explicit agent-based modelling (ABM) approach to depict the interactions between socio-economic and natural subsystems for supporting a more sustainable governance of the river basin resources. Agents consider alternative livelihood strategies and decide to go for the one they perceive as likely to be most profitable. Agents may predict and sense the availability of resources and also can observe economic performance achieved by neighbouring agents. Results are presented at the basin and subbasin level to provide relevant knowledge to Water Resources Users Associations which are important collective forums for water management through which PES schemes

  5. Scenario analysis for integrated water resources planning and management under uncertainty in the Zayandehrud river basin

    Science.gov (United States)

    Safavi, Hamid R.; Golmohammadi, Mohammad H.; Sandoval-Solis, Samuel

    2016-08-01

    The goal of this study is to develop and analyze three scenarios in the Zayandehrud river basin in Iran using a model already built and calibrated by Safavi et al. (2015) that has results for the baseline scenario. Results from the baseline scenario show that water demands will be supplied at the cost of depletion of surface and ground water resources, making this scenario undesirable and unsustainable. Supply Management, Demand Management, and Meta (supply and demand management) scenarios are the selected scenarios in this study. They are to be developed and declared into the Zayandehrud model to assess and evaluate the imminent status of the basin. Certain strategies will be employed for this purpose to improve and rectify the current management policies. The five performance criteria of time-based and volumetric reliability, resilience, vulnerability, and maximum deficit will be employed in the process of scenario analysis and evaluation. The results obtained from the performance criteria will be summed up into a so-called 'Water Resources Sustainability Index' to facilitate comparison among the likely trade-offs. Uncertainties arising from historical data, management policies, rainfall-runoff model, demand priorities, and performance criteria are considered in the proposed conceptual framework and modeled by appropriate approaches. Results show that the Supply Management scenario can be used to improve upon the demand supply but that it has no tangible effects on the improvement of the resources in the study region. In this regard, the Demand Management scenario is found to be more effective than the water supply one although it still remains unacceptable. Results of the Meta scenario indicate that both the supply and demand management scenarios must be applied if the water resources are to be safeguarded against degradation and depletion. In other words, the supply management scenario is necessary but not adequate; rather, it must be coupled to the demand

  6. Drought management plans and water availability in agriculture: A risk assessment model for a Southern European basin

    Directory of Open Access Journals (Sweden)

    Carlos Dionisio Pérez-Blanco

    2014-08-01

    Full Text Available The Drought Management Plans (DMPs are regulatory instruments that establish priorities among the different water uses and define more stringent constraints to access to publicly provided water during droughts, especially for non-priority uses such as agriculture. These plans have recently become widespread across EU southern basins. However, in some of these basins the plans were approved without an assessment of the potential impacts that they may have on the economic activities exposed to water restrictions. This paper develops a stochastic methodology to estimate the expected water availability in agriculture that results from the decision rules of the recently approved DMPs. The methodology is applied to the particular case of the Guadalquivir River Basin in southern Spain. Results show that if DMPs are successfully enforced, available water will satisfy in average 62.2% of current demand, and this figure may drop to 50.2% by the end of the century as a result of climate change. This is much below the minimum threshold of 90% that has been guaranteed to irrigators so far.

  7. Probabilistic scenario-based water resource planning and management:A case study in the Yellow River Basin, China

    Science.gov (United States)

    Dong, C.; Schoups, G.; van de Giesen, N.

    2012-04-01

    Water resource planning and management is subject to large uncertainties with respect to the impact of climate change and socio-economic development on water systems. In order to deal with these uncertainties, probabilistic climate and socio-economic scenarios were developed based on the Principle of Maximum Entropy, as defined within information theory, and as inputs to hydrological models to construct probabilistic water scenarios using Monte Carlo simulation. Probabilistic scenarios provide more explicit information than equally-likely scenarios for decision-making in water resource management. A case was developed for the Yellow River Basin, China, where future water availability and water demand are affected by both climate change and socio-economic development. Climate scenarios of future precipitation and temperature were developed based on the results of multiple Global climate models; and socio-economic scenarios were downscaled from existing large-scale scenarios. Probability distributions were assigned to these scenarios to explicitly represent a full set of future possibilities. Probabilistic climate scenarios were used as input to a rainfall-runoff model to simulate future river discharge and socio-economic scenarios for calculating water demand. A full set of possible future water supply-demand scenarios and their associated probability distributions were generated. This set can feed the further analysis of the future water balance, which can be used as a basis to plan and manage water resources in the Yellow River Basin. Key words: Probabilistic scenarios, climate change, socio-economic development, water management

  8. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    Science.gov (United States)

    Hanson, R. T.; Lockwood, B.; Schmid, Wolfgang

    2014-11-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within “water-balance subregions” (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori. The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations

  9. Participatory Planning for the improvement of water management in uncertain conditions: Case study of the Souss-Massa basin in Morocco

    Science.gov (United States)

    Imani, Yasmina; Lahlou, Ouiam; Slimani, Imane; Joyce, Brian

    2016-04-01

    Due to its geographical location and to the natural features of its climate, Morocco is known as a drought prone and water scarce country. However, the country now faces, in the current context of Climate Change, an increasing and alarming water scarcity due to the combined effects of a strong decline of precipitations and a growing pressure on water resources induced by the economic development and demographic growth. Aware of this pressing issue, Morocco implemented a national water strategy based on the decentralization of water management at the river basin level and the establishment of Integrated Water Resources Management master plans for each basin. Unfortunately, these plans often underestimate the impact of uncertainty and this may lead to inefficient and unsustainable water management strategies. In this context, the aim of this study is to develop an innovative approach for robust decision making in uncertain conditions by coupling the WEAP (Water Evaluation and Planning System) model and the "XLRM" robust decision making framework to support the evaluation of management options and promote long-term sustainable integrated water management strategies at the basin level. The Souss-Massa basin, located in the south-western part of the country was retained as a case study because of its strategic importance but also because it now faces, as a consequence of the irrational use of water resources during the last decades significant water resources management challenges mainly due to the overexploitation of ground water resources, the increased of water demand due to the irrigation development, the urban and industrial growth and the expansion of tourism. Thus, in this study, a three step methodology was developed. First, the WEAP model were developed and calibrated for the Souss-Massa basin. In a second step, a XLRM participatory workshop gathering the basin main stakeholders were organized in order to identify the EXogenous factors (key uncertainties

  10. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  11. Lands with Wilderness Characteristics, Resource Management Plan Constraints, and Land Exchanges: Cross-Jurisdictional Management and Impacts on Unconventional Fuel Development in Utah's Uinta Basin

    Energy Technology Data Exchange (ETDEWEB)

    Keiter, Robert; Ruple, John; Holt, Rebecca; Tanana, Heather; McNeally, Phoebe; Tribby, Clavin

    2012-10-01

    Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Order’s implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics — whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 — are unlikely to profoundly impact oil shale development within Utah’s Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those

  12. From hydraulic infrastructures to basin management plans: limits and uncertainty on development of “protection from water” law

    Directory of Open Access Journals (Sweden)

    Stefano Masini

    2014-01-01

    Full Text Available The law activity for soil protection and water discipline, normally still to the imposition of the hydrological constraint, shows a gradual change towards a stronger planning activity able to recognize an homogeneous basin area, although through great gaps and uncertainties of Public Administration about prediction, prevention and mitigation works. The privates intervention is also ignored, getting worse the soil fragility and the answer to the climatic emergences requiring, in this way, an improvement in participation and responsibility about destination property choices, sheltered for hydrogeological risk.

  13. Wyoming Basin Rapid Ecoregional Assessment: Work Plan

    Science.gov (United States)

    Carr, Natasha B.; Garman, Steven L.; Walters, Annika; Ray, Andrea; Melcher, Cynthia P.; Wesner, Jeff S.; O’Donnell, Michael S.; Sherrill, Kirk R.; Babel, Nils C.; Bowen, Zachary H.

    2013-01-01

    The overall goal of the Rapid Ecoregional Assessments (REAs) being conducted for the Bureau of Land Management (BLM) is to provide information that supports regional planning and analysis for the management of ecological resources. The REA provides an assessment of baseline ecological conditions, an evaluation of current risks from drivers of ecosystem change, and a predictive capacity for evaluating future risks. The REA also may be used for identifying priority areas for conservation or restoration and for assessing the cumulative effects of a variety of land uses. There are several components of the REAs. Management Questions, developed by the BLM and partners for the ecoregion, identify the information needed for addressing land-management responsibilities. Conservation Elements represent regionally significant aquatic and terrestrial species and communities that are to be conserved and (or) restored. The REA also will evaluate major drivers of ecosystem change (Change Agents) currently affecting or likely to affect the status of Conservation Elements. We selected 8 major biomes and 19 species or species assemblages to be included as Conservation Elements. We will address the four primary Change Agents—development, fire, invasive species, and climate change—required for the REA. The purpose of the work plan for the Wyoming Basin REA is to document the selection process for, and final list of, Management Questions, Conservation Elements, and Change Agents. The work plan also presents the overall assessment framework that will be used to assess the status of Conservation Elements and answer Management Questions.

  14. Lands with Wilderness Characteristics, Resource Management Plan Constraints, and Land Exchanges: Cross-Jurisdictional Management and Impacts on Unconventional Fuel Development in Utah's Uinta Basin

    Energy Technology Data Exchange (ETDEWEB)

    Keiter, Robert [Univ. of Utah, Salt Lake City, UT (United States); Ruple, John [Univ. of Utah, Salt Lake City, UT (United States); Holt, Rebecca [Univ. of Utah, Salt Lake City, UT (United States); Tanana, Heather [Univ. of Utah, Salt Lake City, UT (United States); McNeally, Phoebe [Univ. of Utah, Salt Lake City, UT (United States); Tribby, Clavin [Univ. of Utah, Salt Lake City, UT (United States)

    2012-10-01

    Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Order’s implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics — whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 — are unlikely to profoundly impact oil shale development within Utah’s Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those

  15. Combining a conceptual framework and a spatial analysis tool, HABITAT, to support the implementation of river basin management plans

    NARCIS (Netherlands)

    Haasnoot, M.; Wolfshaar, van de K.E.

    2009-01-01

    Since the Ramsar meeting in 1971 many plans and agreements are developed to conserve and improve the quality of wetlands throughout the world. Within the European Union for example legislation has been developed in four Directives which require that water managers test activities on ecological effec

  16. Combining a conceptual framework and a spatial analysis tool, HABITAT, to support the implementation of river basin management plans

    NARCIS (Netherlands)

    Haasnoot, M.; Wolfshaar, van de K.E.

    2009-01-01

    Since the Ramsar meeting in 1971 many plans and agreements are developed to conserve and improve the quality of wetlands throughout the world. Within the European Union for example legislation has been developed in four Directives which require thatwater managers test activities on ecological effect

  17. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) Project A.9

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, J.W.

    2000-05-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment.

  18. A Web-based planning support tool for sediment management in a meso-scale river basin in Western Central Brazil.

    Science.gov (United States)

    Lorz, C; Neumann, C; Bakker, F; Pietzsch, K; Weiß, H; Makeschin, F

    2013-09-01

    In scope of an IWRM concept for the Federal District, Western Central Brazil we developed a planning support tool, which enables non-experts to test the effects of land-use and land-cover change (LULCC) on landscape processes and landscape functions (LPF) related to sediment generation and retention. For this purpose we developed the web-based tool Letsmap do Brasil. The tool has two principal layers. The upper layer contains information on land use and its effect on LPF, i.e. sediment retention, runoff control, nitrogen loss control and agronomic value. The parameterized relation between land use and LPF is the core of the whole system. For each LPF a value specific to land use has been assigned. A second layer contains information on landscape properties and potentials (LPP), e.g. potential for sediment input in river networks and runoff potential. By linking land use and LPPs the system provides a spatially explicit assessment of effects of LULCC on landscape processes and functions (LPF). Letsmap do Brasil might have two major purposes. (1) It will support decision-making in river basin management and sediment management. By creating their own land-use/cover pattern non-expert users are enabled to test effects of LULCC on LPFs. (2) It will support and train non-experts to participate in decision processes in land-use planning. Because of its high adaptability, transparency, and simple handling Letsmap do Brasil might be used as tool in river basin management and land-use planning.

  19. Energy Management Plan.

    Science.gov (United States)

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  20. Energy planning and management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  1. Ernest F. Hollings Ace Basin National Wildlife Refuge: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Ernest F. Hollings Ace Basin NWR for the next 15 years. This plan outlines the Refuge...

  2. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Cropland Management Plan is to describe cropland management activities at Shiawassee National Wildlife Refuge and provide the basis for future...

  3. Upland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Upland Management Plan provides guidelines for the methods and tools to manage uplands on the Arrowwood National Wildlife Refuge to provide quality cover and...

  4. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    global philosophy which includes terminology from ISO 22301:2012, the International Standard for business continuity management systems (BCI, 2014b...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT BUSINESS CONTINUITY MANAGEMENT PLAN December 2014...

  5. Scaling issues in sustainable river basin management

    Science.gov (United States)

    Timmerman, Jos; Froebich, Jochen

    2014-05-01

    Sustainable river basin management implies considering the whole river basin when managing the water resources. Management measures target at dividing the water over different uses (nature, agriculture, industry, households) thereby avoiding calamities like having too much, too little or bad quality water. Water management measures are taken at the local level, usually considering the sub-national and sometimes national effects of such measures. A large part of the world's freshwater resources, however, is contained in river basins and groundwater systems that are shared by two or more countries. Sustainable river basin management consequently has to encompass local, regional, national and international scales. This requires coordination over and cooperation between these levels that is currently compressed into the term 'water governance' . Governance takes into account that a large number of stakeholders in different regimes (the principles, rules and procedures that steer management) contribute to policy and management of a resource. Governance includes the increasing importance of basically non-hierarchical modes of governing, where non-state actors (formal organizations like NGOs, private companies, consumer associations, etc.) participate in the formulation and implementation of public policy. Land use determines the run-off generation and use of irrigation water. Land use is increasingly determined by private sector initiatives at local scale. This is a complicating factor in the governance issue, as in comparison to former developments of large scale irrigation systems, planning institutions at state level have then less insight on actual water consumption. The water management regime of a basin consequently has to account for the different scales of water management and within these different scales with both state and non-state actors. The central elements of regimes include the policy setting (the policies and water management strategies), legal setting

  6. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  7. Ecological River Basin Management.

    Science.gov (United States)

    Smith, Anthony Wayne

    Addressing the Seventh American Water Resources Conference, Washington, D. C., October, 1971, Anthony Wayne Smith, President, National Parks and Conservation Association, presents an expose on how rivers should be managed by methods which restores and preserve the natural life balances of the localities and regions through which they flow. The…

  8. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations...

  9. Wolf management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A memorandum from the Assistant Region Director, Refuges and Wildlife to all U.S. Fish and Wildlife refuge managers regarding the public planning effort on wolf...

  10. Grassland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan is for Bear River Migratory Bird Refuge in Utah. It includes a summary of the refuge, special considerations for endangered species,...

  11. Station Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following plan is the result of a recent initiative in Region 5 to produce general management guidance based on stated objectives for individual field stations....

  12. A Water Resources Planning Tool for the Jordan River Basin

    Directory of Open Access Journals (Sweden)

    Christopher Bonzi

    2011-06-01

    Full Text Available The Jordan River basin is subject to extreme and increasing water scarcity. Management of transboundary water resources in the basin is closely intertwined with political conflicts in the region. We have jointly developed with stakeholders and experts from the riparian countries, a new dynamic consensus database and—supported by hydro-climatological model simulations and participatory scenario exercises in the GLOWA (Global Change and the Hydrological Cycle Jordan River project—a basin-wide Water Evaluation and Planning (WEAP tool, which will allow testing of various unilateral and multilateral adaptation options under climate and socio-economic change. We present its validation and initial (climate and socio-economic scenario analyses with this budget and allocation tool, and invite further adaptation and application of the tool for specific Integrated Water Resources Management (IWRM problems.

  13. 75 FR 13253 - Plan Revision for Lake Tahoe Basin Management Unit, Alpine, El Dorado, and Placer Counties, CA...

    Science.gov (United States)

    2010-03-19

    ..., 2010. The agency expects to release a draft revised forest plan and draft EIS for formal comment by... natural areas, and other special areas. As important as the decisions to be made, is the identification of... science-based evaluations, was used to determine the need for change identified above and will...

  14. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  15. Work plan for the Sangamon River basin, Illinois

    Science.gov (United States)

    Stamer, J.K.; Mades, Dean M.

    1983-01-01

    The U.S. Geological Survey, in cooperation with the Division of Water Resources of the Illinois Department of Transportation and other State agencies, recognizes the need for basin-type assessments in Illinois. This report describes a plan of study for a water-resource assessment of the Sangamon River basin in central Illinois. The purpose of the study would be to provide information to basin planners and regulators on the quantity, quality, and use of water to guide management decisions regarding basin development. Water quality and quantity problems in the Sangamon River basin are associated primarily with agricultural and urban activities, which have contributed high concentrations of suspended sediment, nitrogen, phosphorus, and organic matter to the streams. The impact has resulted in eutrophic lakes, diminished capacity of lakes to store water, low concentrations of dissolved oxygen, and turbid stream and lake waters. The four elements of the plan of study include: (1) determining suspended sediment and nutrient transport, (2) determining the distribution of selected inorganic and organic residues in streambed sediments, (3) determining the waste-load assimilative capacity of the Sangamon River, and (4) applying a hydraulic model to high streamflows. (USGS)

  16. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  17. Plutonium Vulnerability Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  18. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  19. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  20. Biohazardous waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  1. Medical waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  2. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  3. Morris Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Morris Wetland Management District Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  4. Environmental Management System Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most

  5. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  6. Digital spatial data as support for river basin management: The case of Sotla river basin

    Directory of Open Access Journals (Sweden)

    Prah Klemen

    2013-01-01

    Full Text Available Many real-world spatially related problems, including river-basin planning and management, give rise to geographical information system based decision making, since the performance of spatial policy alternatives were traditionally and are still often represented by thematic maps. Advanced technologies and approaches, such as geographical information systems (GIS, offer a unique opportunity to tackle spatial problems traditionally associated with more efficient and effective data collection, analysis, and alternative evaluation. This paper discusses the advantages and challenges of the use of digital spatial data and geographical information systems in river basis management. Spatial data on social, environmental and other spatial conditions for the study area of 451.77 km2, the Slovenian part of the Sotla river basin, are used to study the GIS capabilities of supporting spatial decisions in the framework of river basin management.

  7. Sampling and Analysis Plan for K Basins Debris

    Energy Technology Data Exchange (ETDEWEB)

    WESTCOTT, J.L.

    2000-06-21

    This Sampling and Analysis Plan presents the rationale and strategy for sampling and analysis activities to support removal of debris from the K-East and K-West Basins located in the 100K Area at the Hanford Site. This project is focused on characterization to support waste designation for disposal of waste at the Environmental Restoration Disposal Facility (ERDF). This material has previously been dispositioned at the Hanford Low-Level Burial Grounds or Central Waste Complex. The structures that house the basins are classified as radioactive material areas. Therefore, all materials removed from the buildings are presumed to be radioactively contaminated. Because most of the materials that will be addressed under this plan will be removed from the basins, and because of the cost associated with screening materials for release, it is anticipated that all debris will be managed as low-level waste. Materials will be surveyed, however, to estimate radionuclide content for disposal and to determine that the debris is not contaminated with levels of transuranic radionuclides that would designate the debris as transuranic waste.

  8. Bison and Elk Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Bison and Elk Management Plan is to provide managers with goals, objectives, and strategies for managing bison and elk on the National Elk Refuge...

  9. Kulm Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this habitat management plan (HMP) is to provide a strategic plan for consistently and effectively protecting, acquiring, enhancing, restoring, and...

  10. How integrated is river basin management?

    Science.gov (United States)

    Downs, Peter W.; Gregory, Kenneth J.; Brookes, Andrew

    1991-05-01

    Land and water management is increasingly focused upon the drainage basin. Thirty-six terms recently used for schemes of “integrated basin management” include reference to the subject or area and to the aims of integrated river basin management, often without allusion to the multiobjective nature. Diversity in usage of terms has occurred because of the involvement of different disciplines, of the increasing coherence of the drainage basin approach, and the problems posed in particular parts of the world. The components included in 21 different approaches are analyzed, and, in addition to showing that components related broadly to water supply, river channel, land, and leisure aspects, it is concluded that there are essentially five interrelated facets of integrated basin management that involved water, channel, land, ecology, and human activity. Two aspects not fully included in many previous schemes concern river channel changes and the dynamic integrity of the fluvial system. To clarify the terminology used, it is suggested that the term comprehensive river basin management should be used where a wide range of components is involved, whereas integrated basin management can signify the interactions of components and the dominance of certain components in the particular area. Holistic river basin management is advocated as a term representing an approach that is both fully comprehensive and integrated but also embraces the energetics of the river system and consideration of changes of river channels and of human impacts throughout the river system. The paradigm of working with the river can be extended to one of working with the river in the holistic basin context.

  11. How different institutional arrangements promote integrated river basin management

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Frederiksen, Pia; Saarikoski, Heli;

    2013-01-01

    Management Planning processes in six countries around the Baltic Sea. We use theories on multi-level governance, regime interplay and institutional effectiveness. We find that, in most cases, central governments have played a dominant role in the formulation of river basin management plans, while local...... influence has been somewhat limited. The tight procedural deadlines of the di-rective appear to have pushed for more centralisation than originally intended by the countries. But the analysis also shows that interplay mechanisms such as norms, ideas and incentives do promote effective institutional...

  12. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  13. 1988 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1987 Annual Water Management Report 1988 Annual Water Management Plan. Includes 1987 weather summary, water availability forecast, summary of 1987...

  14. TWRS Configuration management program plan

    Energy Technology Data Exchange (ETDEWEB)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  15. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  16. Dahomey Plantation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Plan describing timber, wildlife and recreational assessments and assoicated development costs of the Dahomey Plantion timberlands. Plan details existinig forest...

  17. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  18. Water management plan [1976

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Approximately 25,150 acres of freshwater marsh, fresh meadows, and season-ally flooded basins dominate the 37,631-acre refuge [RBL NWR].The broad objectives of Ruby...

  19. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    Science.gov (United States)

    2012-02-28

    ... Management Plan, Yakima River Basin, Water Enhancement Project, Benton, Kittitas, Klickitat, and Yakima... analyzed the elements of the Integrated Water Resource Management Plan in the FPEIS. The FPEIS addresses... management plan includes three major components (Habitat, Systems Modification, and Water Supply) which...

  20. Knowledge-based approaches for river basin management

    Directory of Open Access Journals (Sweden)

    P. Mikulecký

    2007-06-01

    Full Text Available Rare attempts to use knowledge technologies and other relevant approaches are found in the river basin management. Some applications of expert systems as well as utilization of soft computing techniques (as neural networks or genetic algorithms are known in an experimental level. Knowledge management approaches still have not been used at all. In this paper we discuss knowledge-based approaches in the river basin management as a difficult yet important direction which could be proven to be helpful. We summarize the research done in the scope of the AQUIN project, one of first Czech knowledge management projects in the river basin management. The project was initiated by the water management company in Pilsen, where dispatchers make decisions about manipulations on the reservoir Nýrsko, the strategic source of drinking water for inhabitants of Pilsen. The project aim was to support dispatchers' decision making under a high degree of uncertainty or data shortage. The research is continued in the scope of a new project AQUINpro, planned for the period of 2006 to 2008.

  1. Development of indicators for assessment of Lake Malawi Basin in an Integrated Lake Basin Management (ILBM framework

    Directory of Open Access Journals (Sweden)

    Clara Limbitso Chidammodzi

    2015-03-01

    Full Text Available This paper sought to understand the current state of the management environment of Lake Malawi Basin, deduce a lake vision and develop indicators for assessing Integrated Lake Basin Management (ILBM in the lake basin. The premise of the study was that targeted indicators are necessary to effectively monitor the lake basin and manage it sustainably. The study focused on the Malawian side of the lake. Interviews, field observations and review of existing lake management and indicator development approaches around the world were the methods employed. It was found that Malawi lacks focus on lakes in its strategies and the existing management of the lake is on a sector-to-sector basis with little coordination. Furthermore, the capacity of lake-related sector institutions is hampered by inadequate resources and unstable flow of funds. It was concluded that the current management of the lake basin is unsustainable and there is need to comprehensively monitor the lake basin as well as formulate and implement management plans and strategies that are based on the knowledge obtained from targeted monitoring. A set of governance indicators was developed taking into account the characteristics of the lake, the values that it offers and the threats that it is facing.

  2. Material Stabilization Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SPEER, D.R.

    1999-09-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  3. Fishery Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A plan stating the slot limits and other fishing regulations on Noxubee National Wildlife Refuge. The slot limits were put in place to encourage removal of excessive...

  4. Beyond water, beyond boundaries: spaces of water management in the Krishna river basin, South India.

    Science.gov (United States)

    Venot, Jean-Philippe; Bharati, Luna; Giordano, Mark; Molle, François

    2011-01-01

    As demand and competition for water resources increase, the river basin has become the primary unit for water management and planning. While appealing in principle, practical implementation of river basin management and allocation has often been problematic. This paper examines the case of the Krishna basin in South India. It highlights that conflicts over basin water are embedded in a broad reality of planning and development where multiple scales of decisionmaking and non-water issues are at play. While this defines the river basin as a disputed "space of dependence", the river basin has yet to acquire a social reality. It is not yet a "space of engagement" in and for which multiple actors take actions. This explains the endurance of an interstate dispute over the sharing of the Krishna waters and sets limits to what can be achieved through further basin water allocation and adjudication mechanisms – tribunals – that are too narrowly defined. There is a need to extend the domain of negotiation from that of a single river basin to multiple scales and to non-water sectors. Institutional arrangements for basin management need to internalise the political spaces of the Indian polity: the states and the panchayats. This re-scaling process is more likely to shape the river basin as a space of engagement in which partial agreements can be iteratively renegotiated, and constitute a promising alternative to the current interstate stalemate.

  5. Hanford site sodium management plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1995-09-25

    The Hanford Site Sodium Management Plan, Revision 1, provides changes to the major elements and management strategy to ensure an integrated and coordinated approach for disposition of the more than 350,000 gallons of sodium and related sodium facilities located at the DOE`s Hanford Site

  6. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  7. Probabilistic Plan Management

    Science.gov (United States)

    2009-11-17

    Bryan Horling, John Phelps, Robert Goldman, Regis Vincent , C. Long, and Bob Kohout. C TAEMS language specification v. 1.06. October 2005. 3.3.2 Justin A...International Conference on Automated Planning and Scheduling (ICAPS ’05), Monterey, California, 2005. 2.2.2, 8.1.4 Vincent Vidal and Héctor Geffner...spec_task (label squashbug-syncpoint) (subtasks cloudscape salesman plainsman angina ) (qaf q_sync_sum)) (spec_task (label cloudscape) (subtasks orient

  8. Forest Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  9. Forest Management Plan : Eufaula National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Eufaula National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  10. Forest Management Plan : Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  11. Mississippi Sandhill Crane NWR Forest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mississippi Sandhill Crane NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  12. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  13. Plans for Implementing the Columbia River Basin Fish and Wildlife Program in Fiscal Year 1986.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1985-10-01

    The Fish and Wildlife Program is an effort to enhance, protect, and mitigate losses of those fish and wildlife which have been affected by the development, operation, and management of hydroelectric facilities in the Columbia River Basin. The implementation plan is organized to address the action items assigned to BPA in Section 1500 of the Council's Fish and Wildlife Program (1984). These action items generally relate to one or more specific measures in the Program. The following information is listed for each project: budget summary, projects, obligation plan, and work plan and milestones.

  14. Implementation of Theeuropeanwater Framework Directive In France: New Challenges For River Basin Organisat Ion, Planning and Participation

    Science.gov (United States)

    Allain, S.

    The European Water Framework Directive (2000/60/EC) establishes a system of participatory river basin planning for national and international basins. The French institutional framework for water management is already very close to this system: the 1964 Water Law actually set up basin bodies, the Agences de l'Eau ("Water Agencies"), at the level of large river basins, and multipartite basin commissions, the Comités de Bassin ("River Basin Authorities"), in order to monitor the Agences de l'Eau's policies; besides, the 1992 Water Law created a planning procedure at this level, the Schéma Directeur d'Aménagement et de Gestion des Eaux (SDAGE : "General Water Management Plan"), aiming to determine general orientations for the management of water resources and having to be defined by the Comités de Bassin. At first glance therefore, the implementation of the European Water Framework Directive should not raise a lot of problems in France. However, a quick analysis of the current situation shows that it is not so obvious : if the French Water Policy set up two basin organisations, neither of them deals concretely with the management of the water resources, and the implementation of water management plans depends on many stakeholders; the SDAGE itself only partially meets the demands of the Directive, regarding e. g. the economic analysis; finally, in spite of the creation of multipartite basin commissions, the public participation is very restricted. Such an analysis leads to pay more attention to the relations to establish between organisation, planning and participation at the level of large river basins. An analysis of other elements of the French institutional framework can help us in this way : another planning procedure was actually created by the 1992 Water Law, the Schéma d'Aménagement et de Gestion des Eaux (SAGE : "Water Management Plan"), aiming to fix general objectives to manage the water resources at the level of small river basins, and having to be

  15. Management Planning: Innovation on Campus.

    Science.gov (United States)

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  16. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  17. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  18. Annual water management plan - 1983-1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  19. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  20. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  1. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  2. Proceedings of the North Aleutian Basin information status and research planning meeting.

    Energy Technology Data Exchange (ETDEWEB)

    LaGory, K. E.; Krummel, J. R.; Hayse, J. W.; Hlohowskyj, I.; Stull, E. A.; Gorenflo, L.; Environmental Science Division

    2007-10-26

    The North Aleutian Basin Planning Area of the Minerals Management Service (MMS) is a large geographic area with significant ecological and natural resources. The Basin includes most of the southeastern part of the Bering Sea continental shelf including all of Bristol Bay. The area supports important habitat for a wide variety of species and globally significant habitat for birds and marine mammals including federally listed species. Villages and communities of the Alaska Peninsula and other areas bordering or near the Basin rely on its natural resources (especially commercial and subsistence fishing) for much of their sustenance and livelihood. The offshore area of the North Aleutian Basin is considered to have important hydrocarbon reserves, especially natural gas. In 2006, the MMS released a draft proposed program, Outer Continental Shelf Oil and Gas Leasing Program, 2007-2012 and an accompanying draft programmatic environmental impact statement (EIS). The draft proposed program identified two lease sales proposed in the North Aleutian Basin in 2010 and 2012, subject to restrictions. The area proposed for leasing in the Basin was restricted to the Sale 92 Area in the southwestern portion. Additional EISs will be needed to evaluate the potential effects of specific lease actions, exploration activities, and development and production plans in the Basin. A full range of updated multidisciplinary scientific information will be needed to address oceanography, fate and effects of oil spills, marine ecosystems, fish, fisheries, birds, marine mammals, socioeconomics, and subsistence in the Basin. Scientific staff at Argonne National Laboratory (Argonne) were contracted to assist the MMS Alaska Outer Continental Shelf (OCS) Region in identifying and prioritizing information needs related to the North Aleutian Basin and potential future oil and gas leasing and development activities. The overall approach focused on three related but separate tasks: (1) identification and

  3. Forest Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney National Wildlife Refuge Forest Management Plan is a general plan which outlines the management objectives, forest descriptions and silviculture of various...

  4. Grassland Management Plan : Trempealeau National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Trempealeau National Wildlife Refuge Grassland Management Plan provides guidelines for grassland habitat preservation and management. The goals of this plan aim...

  5. Forest Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee National Wildlife Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest description, forest...

  6. Litchfield Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Litchfield Wetland Management District for the next 15 years. This plan outlines the...

  7. Station Management Plan Maine Coastal Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan outlines how four Maine refuges and twelve islands and one peninsula should be managed over the next three to five years. Plan results are...

  8. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  9. Coho Salmon Master Plan, Clearwater River Basin.

    Energy Technology Data Exchange (ETDEWEB)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these

  10. Coho Salmon Master Plan, Clearwater River Basin.

    Energy Technology Data Exchange (ETDEWEB)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these

  11. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  12. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  13. Integrated water resources management in the Ruhr River Basin, Germany.

    Science.gov (United States)

    Bode, H; Evers, P; Albrecht, D R

    2003-01-01

    The Ruhr, with an average flow of 80.5 m3/s at its mouth, is a comparatively small tributary to the Rhine River that has to perform an important task: to secure the water supply of more than 5 million people and of the industry in the densely populated region north of the river. The complex water management system and network applied by the Ruhrverband in the natural Ruhr River Basin has been developed step by step, over decades since 1913. And from the beginning, its major goal has been to achieve optimal conditions for the people living in the region. For this purpose, a functional water supply and wastewater disposal infrastructure has been built up. The development of these structures required and still requires multi-dimensional planning and performance. Since the river serves as receiving water and at the same time as a source of drinking water, the above-standard efforts of Ruhrverband for cleaner water also help to conserve nature and wildlife. Ruhrverband has summed up its environmental awareness in the slogan: "For the people and for the environment". This basic water philosophy, successfully applied to the Ruhr for more than 80 years, will be continued in accordance with the new European Water Framework Directive, enacted in 2000, which demands integrated water resources management in natural river basins, by including the good ecological status of surface waterbodies as an additional goal.

  14. Fur Management Plan : Tewaukon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tewaukon NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  15. Furbearer Management Plan : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  16. Fur Management Plan : Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Ottawa NWR Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental health,...

  17. Fur Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  18. Chautauqua National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chautauqua National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  19. Management plan abstract and keyword generator

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fill-in-the-blank Word form will generate abstracts for common management plans including: cropland management, disease contingency, fire management, fishing,...

  20. Water management plan : revised March 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Content of the Ruby Lake NWR Water Management Plan includes information on refuge background, objectives and management strategies, and water management program...

  1. Refuge Management Plan, Part III : Chapter 2 : Forest Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tamarac NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  2. Drought risk management in Mediterranean river basins.

    Science.gov (United States)

    Iglesias, Ana; Garrote, Luis; Martín-Carrasco, Francisco

    2009-01-01

    The Mediterranean region has an extensive hydraulic infrastructure and complex socioeconomic interactions among water users. In this region, competition for water among urban, agricultural, industrial, and environmental demands is strongest in times of water scarcity. Allocation of scarce water in the face of multiple demands is a challenging task that requires careful analysis. Precipitation decreases may likely be translated into drought periods in most cases. Nevertheless water scarcity (the shortage of water resources to serve water demands) not only depends on drought or precipitation deficits but also on water management. Adaptation options depend on the strategic contingency planning and management decisions that affect water resources systems. The risk management of water scarcity and drought depends on the level of water scarcity. Therefore, an adequate diagnosis of the water scarcity level is essential to anticipate the possible solutions. This study proposes a methodology for drought risk management based on the evaluation of 4 indicators of water scarcity to be used to define the thresholds of risk management actions. Based on the definition of thresholds, the study proposes the implementation of risk management actions that may be used for responding to each water scarcity situation.

  3. Integrating water management and spatial planning - Strategies based on the dutch experience

    NARCIS (Netherlands)

    Woltjer, Johan; Al, Niels

    2007-01-01

    A close connection is emerging between water management and spatial planning in the Netherlands as a result of a new acceptance of water on land, and the European Union's recent emphasis on managing water at the scale of entire river basins. We review Dutch and European trends in water management an

  4. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  5. Integrated Water Resources Management Improving Langat Basin Ecosystem Health

    Directory of Open Access Journals (Sweden)

    Mazlin B. Mokhtar

    2008-01-01

    Full Text Available The ecosystem provides us with all the goods and services that form the base of our economic, social cultural and spiritual life. Good scientific information will be required for managing the environment by using the Ecosystem approach. The groundwater is considered as a possible supplementary of alternative water source, and some factories already started shifting their water source from surface water to groundwater. Uncontrolled use of groundwater, however, may induce serious environmental problems, e.g., land subsidence, saltwater intrusion to the aquifer. The establishment of a balanced multi-sector and integrated groundwater resources and environmental management plan is deemed urgent to attain a sustainable groundwater resources use and to maintain a favorable groundwater quality in the Langat Basin. To achieve sustainable lifestyle in large scale ecosystem requires integrated and holistic approaches from all stakeholders. Through Aquifer Storage Recovery (ASR it was determined a revolutionized water resources management, providing a sustainable supply while minimizing the environmental impact of surface storage. By using underground geologic formations to store water, by integrated water resources management advisory system (IWRMAS aquifer recharge can now easily applied to obviate water resource and environmental problems, including seasonal shortages, emergency storage, ground subsidence and saline intrusion.

  6. Basin Management under the Global Climate Change (Take North-East Asia Heilongjiang -Amur Basin and Taihu Basin For Example)

    Science.gov (United States)

    Liu, S.; Zhou, Z.; Zhong, G.; Zhang, X.

    2015-12-01

    The impact of global climate change on environment and society causes increasingly concern in different countries around the world. The main climate characteristic values, such as precipitation and temperature, have been changed, which leads to the variation of water resources, especially in large basins. Heilongjiang-Amur Basin and Taihu Basin are two large and important basins in China with large area and population. As global climate change and human activities have siganificant impacts on hydrology and water resources in two basins, the analysis of climate change are of great value. In this study, in Heilongjiang-Amur Basin, precipitation and temperature are investigated and their variation are predicted. And in Taihu Basin, precipitation including plum rain and typhoon, are studied and the variation trend of precipitation is predicted. Hence, the impacts of global climate change are assessed. From the result, it shows that the average temperature will continue to increase, and the precipitation will reduce first and then turn to increase in these two basins. It demonstrates that the water resources have been affected a lot by climate change as well as human activities. And these conclusions are provided as reference for policy makers and basin authorities in water resources management and natural hazards mitigation. Meanwhile, according to basins' particualr characters, the suggestions to future water resources management in two basins are given, and more scientific, comprehensive and sustained managements are required. Especially, in Heilongjiang-Amur River, which is a boundary river between China and Russia, it is very essential to enhance the cooperation between two countries.

  7. Spring Creek Common Allotment habitat management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management plan for the Spring Creek Common Allotment on Charles M. Russell National Wildlife Refuge, in McCone and Garfield Counties, Montana. This plan discusses...

  8. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  9. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  10. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  11. Fish Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fish Management Plan for Muscatatuck NWR. The Plan provides an introduction to the Refuge, a description of the area, a description of the fish resource...

  12. Santee National Wildlife Refuge Fire Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Fire Management Plan is to provide objectives and guidelines for managingthe 15,095 acres of the Santee National Wildlife Refuge. This plan will...

  13. Kirtland's Warbler Wildlife Management Area Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kirtland's Warbler Wildlife Management Area Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  14. Development of a regional model for integrated management of water resources at the basin scale

    Science.gov (United States)

    Gaiser, T.; Printz, A.; von Raumer, H. G. Schwarz; Götzinger, J.; Dukhovny, V. A.; Barthel, R.; Sorokin, A.; Tuchin, A.; Kiourtsidis, C.; Ganoulis, I.; Stahr, K.

    Integrated modeling is a novel approach to couple knowledge and models from different disciplines and research fields and to use their potential in the strategic planning of water management at the river basin scale. The MOSDEW integrated regional model has been developed in the Neckar basin, a 14,000 km 2 river catchment in South-West Germany as a model cascade of nine submodels covering large scale hydrology, groundwater flow, water demand, agricultural production, point and non-point pollution and chemical as well as biological water quality. The models are being tested and validated in the Neckar basin as well as in additional river basins in West Africa (Ouémé basin) and Central Asia (Chirchik-Ahangaran-Keles basin, CHAB) with contrasting ecological, hydrological and socio-economic boundary conditions. The transfer to the CHAB basin required changes in the submodel selection and integration structure due to the strong anthropogenic modifications of the flow regime in the downstream area. There, water is conveyed from the Chirchik river to other catchments and distributed in a complex channel system to satisfy the demand of competing water users (irrigation, urban water supply, energy production). In the Ouémé basin, the ecohydraulic model was not integrated due to lack of input data for ecological requirements of fish species whereas the groundwater flow model was not applicable to the predominant presence of aquifers in fractured rock. The model results obtained so far are promising with respect to their accuracy to be used in scenario simulations for the strategic basin wide planning of water management.

  15. Problems of Syrdarya river basin management

    Institute of Scientific and Technical Information of China (English)

    Serdar EYEBERENOV; Baijing CAO; Fengting LI

    2009-01-01

    Prior to independence, Central Asian countries were closely interconnected through the regional management incorporating water, energy, and food sectors. This approach, supported by the central government of Union of Soviet Socialist Republics (USSR), functioned effectively - meeting the needs of both upstream and downstream countries. However, after independence, Central Asian countries started prioritizing their own economic development policies without due account to regional concerns such as joint use of water resources, leading to instability.In this study, the case of Syrdarya basin was investigated to show how,such strategies create tension in the region, since primary focus is given to national interests, without consideration for regional problems. To address this issue, an integrated approach to incorporating water,energy, and agriculture is needed. It is suggested that a single sector approach on water alone does not lead to stability, and a multi-sectoral approach is necessary to ensure sustainable development. Countries sharing benefits from the river have to be responsible for costs of operation and maintenance of the water facilities.

  16. Lacassine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lacassine National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  17. Fisheries Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fisheries Management Plan for Muscatatuck NWR provides an introduction to the Refuge, summarizes the relationship of fishery management to Refuge objectives,...

  18. Fire Management Plan and Environmental Assessment 2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fire Management Plan outlines and details all of the refuge objectives for prescribed burns for the 1991 calendar year. It includes new fire management...

  19. Mandalay National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mandalay NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  20. Muscatatuck National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  1. Lower Hatchie Forest Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lower Hatchie National Wildlife Refuge Forest Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  2. Sabine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sabine NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  3. Water Management Plan Recommendations for 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This memorandum outlines the management strategy for water level management on St. Vincent Island in 2007. A table of planned water levels for each month is provided...

  4. Wilderness Management Plan: Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Wilderness Management Plan for Tamarac NWR provides an introduction to the Refuge; a description of the Wilderness Area; a summary of management practices;...

  5. Montezuma National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Montezuma National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  6. Fire management plan Modoc National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to initiate the integrated program of fire management. Component management actions will include suppression (including the appropriate...

  7. Chincoteague National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chincoteague National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  8. Agassiz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  9. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  10. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan summarizes last years planned water management program and actual CY 1983 water events. A more detailed summary is available in the CY 1983 Annual Water...

  11. The San Luis Valley Project : Closed Basin Division : Design and planning of the project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This design and planning document for the Closed Basin Division is a public information packet. The packet describes the planning process, design of the project,...

  12. Integration of hydrologic and water allocation models in basin-scale water resources management considering crop pattern and climate change: Karkheh River Basin in Iran

    Science.gov (United States)

    The paradigm of integrated water resources management requires coupled analysis of hydrology and water resources in a river basin. Population growth and uncertainties due to climate change make historic data not a reliable source of information for future planning of water resources, hence necessit...

  13. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  14. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  15. Planning and managing the physician workforce

    OpenAIRE

    Schoenbaum Stephen C

    2012-01-01

    Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and pro...

  16. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  17. Amendment I : Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This amendment to the fur management plan for Stillwater Wildlife Management area calls for the annual trapping of beaver. The Lower Carson River is overpopulated...

  18. Integrated Pest Management Plan : Kulm Wetland Management District 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  19. Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fur management plan for Stillwater Wildlife Management Area outlines methods of fur harvest, trapping territories, selection of trappers, trapping equipment,...

  20. Integrated Pest Management Plan Kulm Wetland Management District 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  1. Integrated management of operations in Santos Basin: methodology applied to a new philosophy of operations

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Leandro Leonardo; Lima, Claudio Benevenuto de Campos [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Derenzi Neto, Dario [Accenture, Rio de Janeiro, RJ (Brazil); Pinto, Vladimir Steffen [Soda IT, Rio de Janeiro, RJ (Brazil); Lima, Gilson Brito Alves [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2012-07-01

    The objective of this paper is to present the methodology used to develop the Integrated Management of Operations (GIOp) project in Santos Basin Operational Unit (UO-BS) in the South-Southeast Exploration and Production area of PETROBRAS. The following text describes how the activities were carried out to gather improvements opportunities and to design To-Be processes, considering the challenging environment of the Santos Basin in the coming years. At the end of more than 12 months of work, more than 50 processes and sub-processes were redesigned, involving a multidisciplinary team in the areas of operations, maintenance, safety, health and environment, flow assurance, wells, reservoirs and planning. (author)

  2. Enhancing Floodplain Management in the Lower Mekong River Basin Using Vegetation and Water Cycle Satellite Observations

    Science.gov (United States)

    Bolten, J. D.; Spruce, J.; Wilson, R.; Strauch, K.; Doyle, T.; Srinivan, R.; Lakshmi, V.; Gupta, M.

    2014-12-01

    The Lower Mekong River Basin shared by China, Burma, Laos, Thailand, Cambodia, and Vietnam, is considered the lifeblood of Southeast Asia. The Mekong Basin is subject to large hydrological fluctuations on a seasonal and inter-annual basis. The basin remains prone to severe annual floods that continue to cause widespread damage and endanger food security and the livelihood of the millions who dwell in the region. Also the placement of newly planned dams primarily for hydropower in the Lower Mekong Basin may cause damaging social, agriculture and fisheries impacts to the region where we may now likely be at a critical 'tipping point'. The primary goal of this project is to apply NASA and USGS products, tools, and information for improved flood and water management in the Lower Mekong River Basin to help characterize, understand, and predict future changes on the basin. Specifically, we are providing and helping transfer to the Mekong River Commission (MRC) and the member countries of Thailand, Cambodia, Lao, Vietnam, and Burma the enhanced Soil and Water Assessment Tool (SWAT) using remotely sensed surface, ground water, and root zone soil moisture along with improved Land Use and Land Cover (LULC) maps. In order to estimate the flood potential and constrain the SWAT Available Water Capacity model parameter over the region, we are assimilated GRACE Terrestrial Water Storage observations into the Catchment Land Surface Model. In addition, a Graphic Visualization Tool (GVT) as been developed to work in concert with the output of the SWAT model parameterized for the Mekong Basin as an adjunct tool of the MRC Decision Support Framework. The project requires a close coordination of the development and assessment of the enhanced MRC SWAT with the guidance of MRC resource managers and technical advisors. This presentation will evaluate the skill of the enhanced SWAT model using qualitative (i.e., MODIS change detection) and quantitative (e.g., streamflow) metrics over one

  3. [Evaluation model for municipal health planning management].

    Science.gov (United States)

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  4. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  5. Managing for timber and biodiversity in the Congo Basin

    DEFF Research Database (Denmark)

    Nasi, Robert; Billand, Alain; van Vliet, Nathalie

    2012-01-01

    Multiple-use forest management is considered by many as a preferable alternative to single-use, generally timber-dominant, management models. In the Congo Basin rainforests, integration of timber and non-timber forest resources plays a key role in the subsistence and market economies of rural...

  6. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite...

  7. 78 FR 13316 - National Forest System Land Management Planning Directives

    Science.gov (United States)

    2013-02-27

    ... Forest Service RIN 0596-AD06 National Forest System Land Management Planning Directives AGENCY: Forest...) land management planning regulation. Issuance of these proposed directives will provide consistent... CONTACT: Annie Eberhart Goode, Planning Specialist, Ecosystem Management Coordination Staff,...

  8. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  9. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  10. Spatial Preference Heterogeneity for Integrated River Basin Management: The Case of the Shiyang River Basin, China

    Directory of Open Access Journals (Sweden)

    Fanus Asefaw Aregay

    2016-09-01

    Full Text Available Integrated river basin management (IRBM programs have been launched in most parts of China to ease escalating environmental degradation. Meanwhile, little is known about the benefits from and the support for these programs. This paper presents a case study of the preference heterogeneity for IRBM in the Shiyang River Basin, China, as measured by the Willingness to Pay (WTP, for a set of major restoration attributes. A discrete choice analysis of relevant restoration attributes was conducted. The results based on a sample of 1012 households in the whole basin show that, on average, there is significant support for integrated ecological restoration as indicated by significant WTP for all ecological attributes. However, residential location induced preference heterogeneities are prevalent. Generally, compared to upper-basin residents, middle sub-basin residents have lower mean WTP while lower sub-basin residents express higher mean WTP. The disparity in utility is partially explained by the difference in ecological and socio-economic status of the residents. In conclusion, estimating welfare benefit of IRBM projects based on sample responses from a specific sub-section of the basin only may either understate or overstate the welfare estimate.

  11. Fishery Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fishery Management Plan for Tamarac NWR provides an inventory of fishery resources on the Refuge including a description of the water area and fish sampling...

  12. Fire Management Plan : Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains the Finding of No Significant Impact (FONSI) and the Environmental Assessment (EA) for the Ottawa NWR Fire Management Plan. A description of...

  13. Cropland Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  14. Crop Management Plan: Sherburne National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sherburne NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  15. Agassiz National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  16. Cropland Management Plan: Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  17. Agassiz National Wildlife Refuge : Safety Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of this Safety Management Plan are to identify and define safety hazards that may be encountered on Agassiz Refuge and the procedures to be followed...

  18. Fishery Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of the Mingo NWR Fishery Management Plan are to maintain and improve the quality of aquatic habitats for a well-balanced community of fish and other...

  19. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  20. Meredosia National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Meredosia National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at...

  1. Gulf of Maine Tern Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following management plan provides an outline of the tasks proposed to restore tern numbers to levels approximating those reached during the last period of...

  2. Russian River Interim Action Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An interim action plan is presented to guide the 1979 management of the Kenai National Moose Range's portion of the lower Russian River and its confluence with the...

  3. Cropland Management Plan: Louisa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Louisa National Wildlife Refuge Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at...

  4. Fishery management plan: Yazoo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U.S. Fish and Wildlife Service for Yazoo National Wildlife Refuge. Data was provided by the Refuge and Area Office Wildlife...

  5. 1991-92 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi River National Wildlife and Fish Refuge – McGregor District Water Management Plan has been developed to meet the station objectives set forth...

  6. Cropland Management Plan Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Dahomey NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  7. Merced National Wildlife Refuge water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The details of this plan are separated into ten sections: Background, Water Management Related Goals and Objectives, Policies and Procedures, Inventory and Existing...

  8. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  9. The economic value of drought information for water management under climate change: a case study in the Ebro basin

    Directory of Open Access Journals (Sweden)

    S. Quiroga

    2011-03-01

    Full Text Available Drought events in the Mediterranean are likely to increase in frequency, duration and intensity due to climate change, thereby affecting crop production. Information about drought is valuable for river basin authorities and the farmers affected by their decisions. The economic value of this information and the resulting decisions are of interest to these two stakeholder groups and to the information providers. Understanding the dynamics of extreme events, including droughts, in future climate scenarios for the Mediterranean is being improved continuously. This paper analyses the economic value of information on drought events taking into account the risk aversion of water managers. We consider the effects of drought management plans on rice production in the Ebro river basin. This enables us to compute the willingness to compensate the river basin authority for more accurate information allowing for better decision-making. If runoff is reduced, river basin planners can consider the reduction of water allocation for irrigation in order to eliminate the risk of water scarcity. Alternately, river basin planners may decide to maintain water allocation and accept a reduction of water supply reliability, leaving farmers exposed to drought events. These two alternatives offer different risk levels for crop production and farmers' incomes which determine the value of this information to the river basin authority. The information is relevant for the revision of River Basin Management Plans of the Water Framework Directive (WFD within the context of climate change.

  10. Sustainable forest management planning in Serbia

    Directory of Open Access Journals (Sweden)

    Medarević Milan

    2014-01-01

    Full Text Available The forest cover of Serbia occupies around 29% of its territory, which puts it among fairly well wooded countries in Europe. The forests of Serbia are characterized by both state and private forests, medium preservation status, i.e. 27% of area that is covered by insufficiently stocked stands. Coppice forests cover about 50% of the area, and private forests are additionally burdened by fragmented plots. Forest management planning in Serbia is older than 200 years (The Plan of Deliblato Sands Afforestation 1806. There are two basic assumptions that define forest management planning: sustainability and multifunctionality. Today, forest management planning in Serbia is regulated by the Law on forests and it has the characteristics of a system. The planning also has the characteristics of an integral, integrated and adaptive system. The latter is particularly important in terms of pronounced climatic changes. For the forests in protected objects of nature, there are also other types of plans that complement sector plans in forestry (e.g. management plans in protected areas.

  11. Draft of the PHENIX Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  12. Assessing Management Regimes in Transboundary River Basins: Do They Support Adaptive Management?

    Directory of Open Access Journals (Sweden)

    Eduard Interwies

    2008-06-01

    Full Text Available River basin management is faced with complex problems that are characterized by uncertainty and change. In transboundary river basins, historical, legal, and cultural differences add to the complexity. The literature on adaptive management gives several suggestions for handling this complexity. It recognizes the importance of management regimes as enabling or limiting adaptive management, but there is no comprehensive overview of regime features that support adaptive management. This paper presents such an overview, focused on transboundary river basin management. It inventories the features that have been claimed to be central to effective transboundary river basin management and refines them using adaptive management literature. It then collates these features into a framework describing actor networks, policy processes, information management, and legal and financial aspects. Subsequently, this framework is applied to the Orange and Rhine basins. The paper concludes that the framework provides a consistent and comprehensive perspective on transboundary river basin management regimes, and can be used for assessing their capacity to support adaptive management.

  13. Policy Recommendations for the Argentinean Water Resources National Plan Related to Extreme Events in Forested Mountain Basins.

    Science.gov (United States)

    Urciuolo, A. B.; Iturraspe, R. J.; Lofiego, R.

    2007-05-01

    In the framework of activities developed by COHIFE (Federal Water Resource Council), Argentina is preparing the Water Resources National Plan. To achieve an integrating project and considering that Argentina is a federal country, each province is working on the basis of its own Water Resources Provincial Plan. The first step of the plan consists in the identification of problems, with the purpose of further defining solutions based on structural and non structural actions. The general perception of the stakeholders involved in the plan development is the necessity of the analysis of strategies for the integrated water resource management Although a first document for water policy, named "Principios Rectores de Política Hídrica" is available, there are not specific strategies for integrated management of water and land use oriented to extreme events. In other way, there are a lack of policies oriented to Mountain basin with forest coverage, may be because of most of the population and the economical structure of the country is located on plain regions. This article proposes recommendations for policy to be integrated to the Water Resources National Plan, based on studies developed in a pilot basin representative of the Andean-Patagonia eco-region, in the framework of the EPIC FORCE proyect, financed by the European Union. Project methodology includes basin instrumentation, reconstruction and analysis of extreme events and land-water management practices revision. Climate, flow and sediment Data are available for simulation using the Shetran model on different land use scenarios, including changes in the basin forest coverage. On the basis of the first results of the project, policy guides oriented to fill mentioned policy lacks were defined.

  14. Forest Management Plan, ERDA Oak Ridge Reservation: 1976--1980

    Energy Technology Data Exchange (ETDEWEB)

    Bradburn, D. M.

    1977-06-01

    The ERDA Oak Ridge Reservation Forest Management Plan is utilized as a guide in the managing and administering of the natural resources of the forest. A revised management plan summarizes the goals and accomplishment of the previous plan while recommending necessary improvements and alternatives for the ensuing management cycle. The management plan contains programmatic assessments of silvicultural activities and their environmental impacts.

  15. Transforming European Water Governance? Participation and River Basin Management under the EU Water Framework Directive in 13 Member States

    Directory of Open Access Journals (Sweden)

    Nicolas W. Jager

    2016-04-01

    Full Text Available The European Union (EU Water Framework Directive (WFD requires EU member states to produce and implement river basin management plans, which are to be designed and updated via participatory processes that inform, consult with, and actively involve all interested stakeholders. The assumption of the European Commission is that stakeholder participation, and institutional adaptation and procedural innovation to facilitate it, are essential to the effectiveness of river basin planning and, ultimately, the environmental impact of the Directive. We analyzed official documents and the WFD literature to compare implementation of the Directive in EU member states in the initial WFD planning phase (2000–2009. Examining the development of participatory approaches to river basin management planning, we consider the extent of transformation in EU water governance over the period. Employing a mixed quantitative and qualitative approach, we map the implementation “trajectories” of 13 member states, and then provide a detailed examination of shifts in river basin planning and participation in four member states (Germany, Sweden, Poland and France to illustrate the diversity of institutional approaches observed. We identify a general tendency towards increased, yet circumscribed, stakeholder participation in river basin management in the member states examined, alongside clear continuities in terms of their respective pre-WFD institutional and procedural arrangements. Overall, the WFD has driven a highly uneven shift to river basin-level planning among the member states, and instigated a range of efforts to institutionalize stakeholder involvement—often through the establishment of advisory groups to bring organized stakeholders into the planning process.

  16. Planning and managing the physician workforce

    Directory of Open Access Journals (Sweden)

    Schoenbaum Stephen C

    2012-03-01

    Full Text Available Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries. This is a commentary on http://www.ijhpr.org/content/1/1/13.

  17. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  18. Spent Nuclear Fuel Project Document Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  19. Wilderness management plan : Farallon National Wildlife Refuge : Farallon Wilderness : Wilderness management plan [draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Farallon Wilderness. After introducing the area, it analyzes current management practices against current public...

  20. Adaptive Management of Bull Trout Populations in the Lemhi Basin

    Science.gov (United States)

    Peterson, James T.; Tyre, Andrew J.; Converse, Sarah J.; Bogich, Tiffany L.; Miller, Damien; Post van der Burg, Max; Thomas, Carmen; Thompson, Ralph J.; Wood, Jeri; Brewer, Donna; Runge, Michael C.

    2011-01-01

    The bull trout Salvelinus confluentus, a stream-living salmonid distributed in drainages of the northwestern United States, is listed as threatened under the Endangered Species Act because of rangewide declines. One proposed recovery action is the reconnection of tributaries in the Lemhi Basin. Past water use policies in this core area disconnected headwater spawning sites from downstream habitat and have led to the loss of migratory life history forms. We developed an adaptive management framework to analyze which types of streams should be prioritized for reconnection under a proposed Habitat Conservation Plan. We developed a Stochastic Dynamic Program that identified optimal policies over time under four different assumptions about the nature of the migratory behavior and the effects of brook trout Salvelinus fontinalis on subpopulations of bull trout. In general, given the current state of the system and the uncertainties about the dynamics, the optimal policy would be to connect streams that are currently occupied by bull trout. We also estimated the value of information as the difference between absolute certainty about which of our four assumptions were correct, and a model averaged optimization assuming no knowledge. Overall there is little to be gained by learning about the dynamics of the system in its current state, although in other parts of the state space reducing uncertainties about the system would be very valuable. We also conducted a sensitivity analysis; the optimal decision at the current state does not change even when parameter values are changed up to 75% of the baseline values. Overall, the exercise demonstrates that it is possible to apply adaptive management principles to threatened and endangered species, but logistical and data availability constraints make detailed analyses difficult.

  1. Productivity enhancement planning using participative management concepts

    Science.gov (United States)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  2. Stillwater Wildlife Management Area : Grasslands Management Plan : North Marsh Unit

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan is designed to serve as the initial Fish and Wildlife Service habitat management proposal for the North Marsh grazing unit of Stillwater National Wildlife...

  3. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No. 68 / Monday, April 9, 2012... National Forest System Land Management Planning AGENCY: Forest Service, USDA. ACTION: Final rule and record... land management planning rule (planning rule). The new planning rule guides the development,...

  4. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  5. 76 FR 17347 - Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control...

    Science.gov (United States)

    2011-03-29

    ...) * * * (D) Great Basin Unified Air Pollution Control District (1) Rule 201, ``Exemptions,'' adopted on... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control District CFR Correction In Title 40 of the Code of Federal Regulations, Part 52 (Sec....

  6. Interaction between stakeholders and research for integrated river basin management

    NARCIS (Netherlands)

    Jongman, R.H.G.; Padovani, C.R.

    2006-01-01

    Integrated Water Management calls for basin-wide coordination of activities related to land and water use. The need for multi-stakeholder involvement, the necessity to integrate scientific approaches and local information, the process of mutual communication, the results of discussions on integrated

  7. Integrated water management. The contribution of agricultural planning; Integrierte Wasserbewirtschaftung. Beitrag der Landwirtschaftsplanung

    Energy Technology Data Exchange (ETDEWEB)

    Bruns, Diedrich [Univ. Kassel (DE). Fachgebiet Landwirtschaftsplanung/Naturschutz (Germany)

    2004-09-01

    Official ''Landscape Planning'' provides information on Nature and Landscape for decision making. In Germany it makes contributions to environmental and spatial planning on all levels of public administration, including water and watershed management. As part of comprehensive planning a number of programmatic documents are provided on national, regional and local levels. These may serve as starting points for contributions to sectoral planning. In ''Integrated Water Management'' these include contributions to River Basin Management, to flood risk management for watersheds, and Environmental Reports required as part of Strategic Environmental Assessment. In project approval contributions of landscape planning include Environmental Reports for EIA, as well as landscape design and mitigation plans required according to environmental legislation. Additional contributions are made during implementation and construction of individual measures. Two examples of ''Integrated Water Management'' serve to demonstrate which factors lead to success in co-operation between water management planning and landscape planning''. The first factor of importance is that contracts for both are issued simultaneously, and that their task and mission is comprehensive and all inclusive. Public consultations are becoming increasingly important parts of spatial planning. They provide challenges that may also be mastered successfully in close co-operation of water management and landscape planning. (orig.)

  8. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  9. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Forest Service 36 CFR Part 219 RIN 0596-AB86 National Forest System Land Management Planning; Correction...-1104. FOR FURTHER INFORMATION CONTACT: Ecosystem Management Coordination staff's Planning Specialist... management plans (the planning rule). The National Forest Management Act (NFMA) at 16 U.S.C....

  10. Sedimentation retention basin utilization for best management practice

    Institute of Scientific and Technical Information of China (English)

    Zaheer Iqbal; CUI Guang-bo; ZHANG Li-qiong

    2003-01-01

    Approaches to the artificial impoundment and theoretical design of sedimentation retention basin are reviewed with particular attention to best management practice(BMP) to control agriculture and surface runoff. Sediments retention basins are the small version of farm pond used where a criteria of farm pond is not met. Such basin traps the pollutants and suspended solids prior to entry into streams and lakes. The study is focused with special reference to the assessment and control of non-point source pollution(NPSP) from the sub-basin area of Tai Lake in the Xishan County of Wuxi City of China. The author suggested two different approaches to conduct this study including theoretical design for sedimentation retention basin and computation of flow, sediment transport and deposition during the artificial impoundment of retention basin for BMP's utilization. Theoretical design will provide a useful function as a first line defense against the movement of sediments and transport of pollutants into the Tai Lake while the assessment of sediments deposition will help to make its proper use and periodic cleanup.

  11. A hydrologic analysis for the infiltration basins planned on Jeju Island, Korea

    Science.gov (United States)

    Lee, S.; Kang, T.; Lee, J.; Kang, S.

    2010-12-01

    Urban development is a cause of expansion of impervious area. It reduces infiltration of rain water and may increase runoff volume from storms. Infiltration basins can be a method to receive storm water and to let the water move into the soil. The contents of the study include a hydrologic analysis on a site and an evaluation of the capacity of infiltration basins planned on the site. Most region of Jeju Island, Korea is highly pervious. Three infiltration basins were designed on the area of the Jeju English Education City. To evaluate adequacy of the capacities of the infiltration basins, infiltration rates were measured and storm water runoff was simulated. Infiltration rates on the surface of the reserved land for infiltration basins were measured by a standard double ring infiltrometer or a small infiltrometer. A FORTRAN version of SWMM was modified to incorporate the infiltration basin and the basic equations of the infiltration basin are same as those of the infiltration trench used in MIDUSS. The code modified was used to simulate storm runoff from watersheds, infiltration from the infiltration basins, and reservoir routing of the infiltration basins. The saturated hydraulic conductivities on the reserved sites were measured by 0.0068, 0.0038, and 0.00017 cm/sec. The return period of the design rainfall is fifty years. The following results were obtained from a hydrologic analysis on the watersheds and the infiltration basins to be built. The two infiltration basins with higher infiltration rates have adequate capacities to infiltrate the total water inflow to the basins. Some water, however releases from the other infiltration basin and the capacity of the basin is not sufficient to infiltrate the total runoff after the land use change. A channel is needed in which the water released from the less pervious basin flows. The hydrologic analysis method of the study can be used for capacity evaluation of future infiltration basins on highly pervious areas in

  12. Myopia management: multihospital portfolio planning.

    Science.gov (United States)

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  13. The Indus basin in the framework of current and future water resources management

    Science.gov (United States)

    Laghari, A. N.; Vanham, D.; Rauch, W.

    2012-04-01

    The Indus basin is one of the regions in the world that is faced with major challenges for its water sector, due to population growth, rapid urbanisation and industrialisation, environmental degradation, unregulated utilization of the resources, inefficient water use and poverty, all aggravated by climate change. The Indus Basin is shared by 4 countries - Pakistan, India, Afghanistan and China. With a current population of 237 million people which is projected to increase to 319 million in 2025 and 383 million in 2050, already today water resources are abstracted almost entirely (more than 95% for irrigation). Climate change will result in increased water availability in the short term. However in the long term water availability will decrease. Some current aspects in the basin need to be re-evaluated. During the past decades water abstractions - and especially groundwater extractions - have augmented continuously to support a rice-wheat system where rice is grown during the kharif (wet, summer) season (as well as sugar cane, cotton, maize and other crops) and wheat during the rabi (dry, winter) season. However, the sustainability of this system in its current form is questionable. Additional water for domestic and industrial purposes is required for the future and should be made available by a reduction in irrigation requirements. This paper gives a comprehensive listing and description of available options for current and future sustainable water resources management (WRM) within the basin. Sustainable WRM practices include both water supply management and water demand management options. Water supply management options include: (1) reservoir management as the basin is characterised by a strong seasonal behaviour in water availability (monsoon and meltwater) and water demands; (2) water quality conservation and investment in wastewater infrastructure; (3) the use of alternative water resources like the recycling of wastewater and desalination; (4) land use

  14. The Indus basin in the framework of current and future water resources management

    Directory of Open Access Journals (Sweden)

    A. N. Laghari

    2012-04-01

    Full Text Available The Indus basin is one of the regions in the world that is faced with major challenges for its water sector, due to population growth, rapid urbanisation and industrialisation, environmental degradation, unregulated utilization of the resources, inefficient water use and poverty, all aggravated by climate change. The Indus Basin is shared by 4 countries – Pakistan, India, Afghanistan and China. With a current population of 237 million people which is projected to increase to 319 million in 2025 and 383 million in 2050, already today water resources are abstracted almost entirely (more than 95% for irrigation. Climate change will result in increased water availability in the short term. However in the long term water availability will decrease. Some current aspects in the basin need to be re-evaluated. During the past decades water abstractions – and especially groundwater extractions – have augmented continuously to support a rice-wheat system where rice is grown during the kharif (wet, summer season (as well as sugar cane, cotton, maize and other crops and wheat during the rabi (dry, winter season. However, the sustainability of this system in its current form is questionable. Additional water for domestic and industrial purposes is required for the future and should be made available by a reduction in irrigation requirements. This paper gives a comprehensive listing and description of available options for current and future sustainable water resources management (WRM within the basin. Sustainable WRM practices include both water supply management and water demand management options. Water supply management options include: (1 reservoir management as the basin is characterised by a strong seasonal behaviour in water availability (monsoon and meltwater and water demands; (2 water quality conservation and investment in wastewater infrastructure; (3 the use of alternative water resources like the recycling of wastewater and desalination; (4

  15. Management plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  16. Management model application at nested spatial levels in Mediterranean Basins

    Science.gov (United States)

    Lo Porto, Antonio; De Girolamo, Anna Maria; Froebrich, Jochen

    2014-05-01

    In the EU Water Framework Directive (WFD) implementation processes, hydrological and water quality models can be powerful tools that allow to design and test alternative management strategies, as well as judging their general feasibility and acceptance. Although in recent decades several models have been developed, their use in Mediterranean basins, where rivers have a temporary character, is quite complex and there is limited information in literature which can facilitate model applications and result evaluations in this region. The high spatial variability which characterizes rainfall events, soil hydrological properties and land uses of Mediterranean basin makes more difficult to simulate hydrological and water quality in this region than in other Countries. This variability also has several implications in modeling simulations results especially when simulations at different spatial scale are needed for watershed management purpose. It is well known that environmental processes operating at different spatial scale determine diverse impacts on water quality status (hydrological, chemical, ecological). Hence, the development of management strategies have to include both large scale (watershed) and local spatial scales approaches (e.g. stream reach). This paper presents the results of a study which analyzes how the spatial scale affects the results of hydrologic process and water quality of model simulations in a Mediterranean watershed. Several aspects involved in modeling hydrological and water quality processes at different spatial scale for river basin management are investigated including model data requirements, data availability, model results and uncertainty. A hydrologic and water quality model (SWAT) was used to simulate hydrologic processes and water quality at different spatial scales in the Candelaro river basin (Puglia, S-E Italy) and to design management strategies to reach as possible WFD goals. When studying a basin to assess its current status

  17. Double-O Habitat Management Plan: Malheur National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Double-0 Plan is a step-down plan of the 1985 Refuge Master Plan and Environmental Assessment. The purpose of this plan is to guide the management, protection,...

  18. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...) The functions to be exercised by the Indian Tribe pertain to the management and protection of...

  19. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  20. Data Management Facility Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  1. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  2. BUSINESS PLAN AS A MANAGEMENT TOOL

    Directory of Open Access Journals (Sweden)

    BRAG Ă FILOFTEIA VIORICA

    2013-02-01

    Full Text Available Most business people think of the business plans when they starting a new business or submitting documentation for accessing the funding source. The business plan involves a thinking perspective on the business, beginning from the set objectives, includes all the stages and resources they need to achieve them over a period of time. Therefore, in this article, we emphasize that they are equally useful for the daily management of a business, even if a business needs or not the new investment. Businesses need plans to optimize the growth and the development in accordance with the priorities.

  3. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    under curbing spatial coordination capacities, it could be argued that spatial planning in Denmark currently faces a state of crisis at national and especially regional levels – particularly when compared with the domain’s former clout and capacities. Following the 2015 general election the new centre...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth....

  4. Defense System Software Management Plan

    Science.gov (United States)

    1976-03-01

    quality assurance discipline " Lack of quantitative data base for feedback of "lessons learned" 2. Actions to be Taken a. Service policies will be...and identify where they could be improved. Feedback from the field will be incorporated in updated versions of the guidelines and a cor cinued...c~0 .00 0 u 0 Efl ) 0 0 H 11-4 " . 00 oo Wro o,_ U ) z I QI- (n 0 0~ wH 000 1-5 MANAGEMENT PRACTICE AND PROCEDURE The action vehicle envf.sioned for

  5. Hanford site integrated pest management plan

    Energy Technology Data Exchange (ETDEWEB)

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  6. Manage water resources allocation and water use in the Susquehanna River Basin with a GIS-based model

    Science.gov (United States)

    Zhang, Z.; Balay, J.

    2012-12-01

    Water supply is one of the priority management areas of the Susquehanna River Basin Commission. The desired results of the water supply is to meet immediate and future water needs of the people of the basin, in order to maintain sustainable economic viability, protect instream uses, and ensure ecological diversity. In this study, a GIS-based model is designed and developed to assist water resource planning and management in the Susquehanna River Basin. A comprehensive basin-wide water use geographic database is compiled by integrating reported/approved water use and estimated water use if no monitoring data is available, such as agriculture water use. Then water availability at each WBD10 watersheds within the Susquehanna River Basin are then determined based on the ecosystem flow needs and acceptable hydrologic alternation. A GIS-based basin-wide model integrates the water use and water availability and couples with a module that allows iterative evaluation of water resources management alternatives. The model is capable of quantification and graphic presentation of water use and availability at various spatial scale and performance of spatial analysis and scenario analysis to aid in determining optimized water resources management.

  7. Management Matters: Planning Goals and Time

    Science.gov (United States)

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  8. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  9. Grasslands Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The goal of this Grassland Management Plan for Tamarac NWR is to provide a variety of quality grasslands, by the year 1999 totaling 2,500 acres and eventually 5,000...

  10. Outcomes Oriented Planning, Management, and Evaluation.

    Science.gov (United States)

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  11. Comprehensive Conservation Plan: Huron Wetland Management District, Madison Wetland Management District, Sand Lake Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Huron Wetland Management District, Madison Wetland Management District, and Sand Lake...

  12. Combining Expert and Stakeholder Knowledge to Define Water Management Priorities in the Mékrou River Basin

    Directory of Open Access Journals (Sweden)

    Arnaud Reynaud

    2015-12-01

    Full Text Available Participatory approaches to water management, and specifically to transboundary river management, have been widely applied over recent decades. Regarding transboundary rivers, the active involvement of key actors in policy planning is of great importance. In this context, a participatory approach has been used to identify sectors of interest and priorities related to water and development in the Mékrou transboundary River Basin involving three countries: Benin, Burkina Faso and Niger. We conducted a web-based survey to quantify expert opinion on sectors of water management policy and priorities for the Mékrou River Basin. The same set of questions was then put to a sample of local stakeholders living in this river basin. Our analysis reveals some points of convergence and some discrepancies between the opinions of experts and local stakeholders. Overall, it provides a comparative analysis of how experts and local stakeholders prioritize water policy measures, which could influence decision-making.

  13. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  14. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...... comprises a finely tuned relationship between a strong national authority and autonomous municipal councils. The purpose is to solve the tasks at the lowest possible level so as to combine responsibility for decision-making with accountability for financial, social, and environmental consequences. To put...

  15. Strategic planning manager and management education in elementary education institutions

    Directory of Open Access Journals (Sweden)

    Kleeder José Bracho Pérez

    2013-10-01

    Full Text Available The purpose of this study was to determine the relationship between strategic planning and management of educational managers in primary schools of the parish municipality of Ricaurte Mara. The research was based on the theoretical bases of authors: Serna (2003, Chiavenato (2001, and Weihrich Koantz (2004, Pacheco, chestnut and Caicedo (2002 among others. The research was descriptive correlational design under a nonexperimental transactional field, the population consisted of 115 subjects between administrators and teachers, which the sample was taken and Tamayo Tamayo criterion; census. Data collection was conducted through two questionnaires (Brad for managers and (Brad for teachers each consisting of 42 items in Likert-type scale with four answer choices, which was validated by five experts and the reliability was calculated through Cronbach alpha coefficient was the result of which (0.95 for the questionnaire (Brad applied to directors and (0.90 for the questionnaire (Brad applied to teachers. The statistic used was descriptive using percentage tables. The results determined that the application of strategic planning by educational managers is low so there are weaknesses in management, we can say that there is a very high correlation (r = 0.89 between strategic planning and management of the educational manager in primary schools of the parish municipality of Ricaurte Mara. 

  16. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  17. A Wildlife Habitat Protection, Mitigation and Enhancement Plan for Eight Federal Hydroelectric Facilities in the Willamette River Basin: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Preston, S.K.

    1987-05-01

    The development and operation of eight federal hydroelectric projects in the Willamette River Basin impacted 30,776 acres of prime wildlife habitat. This study proposes mitigative measures for the losses to wildlife and wildlife habitat resulting from these projects, under the direction of the Columbia River Basin (CRB) Fish and Wildlife Program. The CRB Fish and Wildlife Program was adopted in 1982 by the Northwest Power Planning Council, pursuant to the Northwest Power Planning Act of 1980. The proposed mitigation plan is based on the findings of loss assessments completed in 1985, that used a modified Habitat Evaluation Procedure (HEP) to assess the extent of impact to wildlife and wildlife habitat, with 24 evaluation species. The vegetative structure of the impacted habitat was broken down into three components: big game winter range, riparian habitat and old-growth forest. The mitigation plan proposes implementation of the following, over a period of 20 years: (1) purchase of cut-over timber lands to mitigate, in the long-term, for big game winter range, and portions of the riparian habitat and old-growth forest (approx. 20,000 acres); (2) purchase approximately 4,400 acres of riparian habitat along the Willamette River Greenway; and (3) three options to mitigate for the outstanding old-growth forest losses. Monitoring would be required in the early stages of the 100-year plan. The timber lands would be actively managed for elk and timber revenue could provide O and M costs over the long-term.

  18. Hazardous waste management in the Pacific basin

    Energy Technology Data Exchange (ETDEWEB)

    Cirillo, R.R.; Chiu, S.; Chun, K.C.; Conzelmann, G. [Argonne National Lab., IL (United States); Carpenter, R.A.; Indriyanto, S.H. [East-West Center, Honolulu, HI (United States)

    1994-11-01

    Hazardous waste control activities in Asia and the Pacific have been reviewed. The review includes China (mainland, Hong Kong, and Taiwan), Indonesia, Korea, Malaysia, Papua New Guinea, the Philippines, Singapore, and Thailand. It covers the sources of hazardous waste, the government structure for dealing with hazardous waste, and current hazardous waste control activities in each country. In addition, the hazardous waste program activities of US government agencies, US private-sector organizations, and international organizations are reviewed. The objective of these reviews is to provide a comprehensive picture of the current hazardous waste problems and the waste management approaches being used to address them so that new program activities can be designed more efficiently.

  19. AVLIS Production Plant Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  20. Optical Networks Solutions planning - performances - management

    DEFF Research Database (Denmark)

    Fenger, Christian

    2002-01-01

    are kept optical and not converted into the optical domain. The focus is on the scientific results achieved throughout the Ph.D. period. Five subjects – all increasing the understanding of optical networks – are studied. Static wavelength routed optical networks are studied. Management on terms...... is up to two wavelengths, significant capacity savings are possible. Network planning in the form of optimal design of national and regional telecommunication networks is thoroughly studied and promising computer programs and methods are developed. In the optimization process are both duct, fiber......, and switch equipment cost considered. The contribution in network planning are one of the most important contributions with direct usability....

  1. National NIF Diagnostic Program Interim Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  2. Optimally managing water resources in large river basins for an uncertain future

    Science.gov (United States)

    Roehl, Edwin A.; Conrads, Paul A.

    2014-01-01

    Managers of large river basins face conflicting needs for water resources such as wildlife habitat, water supply, wastewater assimilative capacity, flood control, hydroelectricity, and recreation. The Savannah River Basin for example, has experienced three major droughts since 2000 that resulted in record low water levels in its reservoirs, impacting local economies for years. The Savannah River Basin’s coastal area contains municipal water intakes and the ecologically sensitive freshwater tidal marshes of the Savannah National Wildlife Refuge. The Port of Savannah is the fourth busiest in the United States, and modifications to the harbor have caused saltwater to migrate upstream, reducing the freshwater marsh’s acreage more than 50 percent since the 1970s. There is a planned deepening of the harbor that includes flow-alteration features to minimize further migration of salinity. The effectiveness of the flow-alteration features will only be known after they are constructed.

  3. Plan for characterization of K Basin spent nuclear fuel and sludge

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, L.A.; Marschman, S.C.

    1995-06-01

    This plan outlines a characterization program that supports the accelerated Path Forward scope and schedules for the Spent Nuclear Fuel stored in the Hanford K Basins. This plan is driven by the schedule to begin fuel transfer by December 1997. The program is structured for 4 years and is limited to in-situ and laboratory examinations of the spent nuclear fuel and sludge in the K East and K West Basins. The program provides bounding behavior of the fuel, and verification and acceptability for three different sludge disposal pathways. Fuel examinations are based on two shipping campaigns for the K West Basin and one from the K East Basin. Laboratory examinations include physical condition, hydride and oxide content, conditioning testing, and dry storage behavior.

  4. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans)...

  5. Managing water resources for sustainable development: the case of integrated river basin management in China.

    Science.gov (United States)

    Song, X; Ravesteijn, W; Frostell, B; Wennersten, R

    2010-01-01

    The emerging water crisis in China shows that the current institutional frameworks and policies with regard to water resources management are incapable of achieving an effective and satisfactory situation that includes Integrated River Basin Management (IRBM). This paper analyses this framework and related policies, examines their deficiencies in relation to all water stress problems and explores alternatives focusing on river basins. Water resources management reforms in modern China are reviewed and the main problems involved in transforming the current river management system into an IRBM-based system are analysed. The Huai River basin is used as an example of current river basin management, with quantitative data serving to show the scale and scope of the problems in the country as a whole. The institutional reforms required are discussed and a conceptual institutional framework is proposed to facilitate the implementation of IRBM in China. In particular, the roles, power and responsibilities of River Basin Commissions (RBCs) should be legally strengthened; the functions of supervising, decision-making and execution should be separated; and cross-sectoral legislation, institutional coordination and public participation at all levels should be promoted.

  6. Des Lacs National Wildlife Refuge Water Management Plan 1961

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  7. Des Lacs National Wildlife Refuge Water Management Plan 1969

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  8. Water Management Plan 1950 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  9. Pocosin Lakes National Wildlife Refuge : 2006 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  10. Pocosin Lakes National Wildlife Refuge : 2009 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2009 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  11. Water Management Plan 1949 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  12. Des Lacs National Wildlife Refuge Water Management Plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  13. Des Lacs National Wildlife Refuge Water Management Plan 1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  14. Pocosin Lakes National Wildlife Refuge : 2004 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  15. Ottawa National Wildlife Refuge : Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Ottawa NWR Integrated Pest Management plan (IPM) is to provide a plan and a tool for adaptive management of invasive species on the Refuge. The...

  16. Comprehensive Conservation Plan: North Dakota Wetland Management Districts

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on North Dakota Wetland Management Districts for the next 15 years. This plan outlines the...

  17. Comprehensive hatchery management plan: Carson National Fish Hatchery

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Hatchery Management Plan (CHMP) for the Carson National Fish Hatchery (NFH) is an operational management plan which outlines policy, legal...

  18. 78 FR 65751 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-11-01

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... States, Metropolitan Planning Organizations (MPO), and local governments that intend to initiate or continue Integrated Corridor Management (ICM) development with their partners, such as arterial...

  19. Forest Management Plan : Upper Mississippi River Wildlife & Fish Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi National Wildlife and Fish Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest...

  20. Yukon Flats National Wildlife Refuge Fishery. Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Yukon Flats National Wildlife Refuge Fishery Management Plan (Fishery Plan) provides comprehensive management direction to insure that fish species and habitats...

  1. Crab Orchard National Wildlife Refuge : Wilderness Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Wilderness Management Plan is a general plan which outlines the Refuge management objectives, wilderness creation and...

  2. St. Croix Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on St. Croix Wetland Management District for the next 15 years. This plan outlines the...

  3. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  4. Life-cycle cost and impacts: alternatives for managing KE basin sludge

    Energy Technology Data Exchange (ETDEWEB)

    Alderman, C.J.

    1997-06-27

    This document presents the results of a life-cycle cost and impacts evaluation of alternatives for managing sludge that will be removed from the K Basins. The two basins are located in the 100-K Area of the Hanford Site. This evaluation was conducted by Fluor Daniel Hanford, Inc. (FDH) and its subcontractors to support decisions regarding the ultimate disposition of the sludge. The long-range plan for the Hanford Site calls for spent nuclear fuel (SNF), sludge, debris, and water to be removed from the K East (KE) and K West (KW) Basins. This activity will be conducted as a removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The scope of the CERCLA action will be limited to removing the SNF, sludge, debris, and water from the basins and transferring them to authorized facilities for interim storage and/or treatment and disposal. The scope includes treating the sludge and water in the 100-K Area prior to the transfer. Alternatives for the removal action are evaluated in a CERCLA engineering evaluation/cost analysis (EE/CA) and include different methods for managing sludge from the KE Basins. The scope of the removal action does not include storing, treating, or disposing of the sludge once it is transferred to the receiving facility and the EE/CA does not evaluate those downstream activities. This life-cycle evaluation goes beyond the EE/CA and considers the full life-cycle costs and impacts of dispositioning sludge.

  5. Strategic plan for Hanford site information management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE.

  6. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.

  7. Remote sensing for land management and planning

    Science.gov (United States)

    Woodcock, Curtis E.; Strahler, Alan H.; Franklin, Janet

    1983-05-01

    The primary role of remote sensing in land management and planning has been to provide information concerning the physical characteristics of the land which influence the management of individual land parcels or the allocation of lands to various uses These physical characteristics have typically been assessed through aerial photography, which is used to develop resource maps and to monitor changing environmental conditions These uses are well developed and currently well integrated into the planning infrastructure at local, state, and federal levels in the United States. Many newly emerging uses of remote sensing involve digital images which are collected, stored, and processed automatically by electromechanical scanning devices and electronic computers Some scanning devices operate from aircraft or spacecraft to scan ground scenes directly; others scan conventional aerial transparencies to yield digital images. Digital imagery offers the potential for computer-based automated map production, a process that can significantly increase the amount and timeliness of information available to land managers and planners. Future uses of remote sensing in land planning and management will involve geographic information systems, which store resource information in a geocoded format. Geographic information systems allow the automated integration of disparate types of resource data through various types of spatial models so that with accompanying sample ground data, information in the form of thematic maps and/ or aerially aggregated statistics can be produced Key issues confronting the development and integration of geographic information systems into planning pathways are restoration and rectification of digital images, automated techniques for combining both quantitative and qualitative types of data in information-extracting procedures, and the compatibility of alternative data storage modes

  8. Trusted Computing Exemplar: Life Cycle Management Plan

    Science.gov (United States)

    2014-12-12

    Informal “An informal specification is written as prose in natural language...(e.g., Dutch, English, French, German). An informal specification is not...informal) prose . The restricted syntax language may be a natural language with restricted sentence structure and keywords with special meaning, or it may...accompanied by supporting explanatory (informal) prose .” [4] TCX: Life Cycle Management Plan NPS-CAG-14-002 4 2 Life Cycle Phases and Activities

  9. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  10. Perspectives of Forest Management Planning: Slovenian and Croatian Experience

    OpenAIRE

    2009-01-01

    Drawing upon the historical framework of origin and development, and a long tradition in forest management planning in Slovenia and Croatia, and based on a survey of literature and research to date, this paper addresses problems and perspectives of forest management planning. Comparison is made of forest management planning concepts, which generally differ from country to country in terms of natural, social and economic circumstances. Impacts of forest management planning on the condition and...

  11. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  12. Rainwater Wildlife Area Management Plan : Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

    2002-02-01

    The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

  13. 7 CFR 225.4 - Program management and administration plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Program management and administration plan. 225.4... Provisions § 225.4 Program management and administration plan. (a) Not later than February 15 of each year, each State agency shall submit to FNSRO a Program management and administration plan for that...

  14. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  15. 40 CFR 60.55c - Waste management plan.

    Science.gov (United States)

    2010-07-01

    ... Waste Incinerators for Which Construction is Commenced After June 20, 1996 § 60.55c Waste management plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management plan. 60.55c...

  16. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  17. The Palouse Basin Participatory Model Pilot Project: A Participatory Approach to Bi-state Groundwater Management

    Science.gov (United States)

    Beall, A.; Fiedler, F.; Boll, J.; Cosens, B.; Harris, C.

    2008-12-01

    In March 2008, The University of Idaho Waters of the West, the Palouse Basin Aquifer Committee and its Citizen Advisory Group undertook a pilot project to explore the use of participatory modeling to assist with water resource management decisions. The Palouse basin supplies Moscow, Idaho, Pullman, Washington, and surrounding communities with high quality groundwater. However, water levels in the major aquifer systems have been declining since records have been kept. Solutions are complicated by jurisdictional considerations and limited alternatives for supply. We hope that by using a participatory approach major conflicts will be avoided. Group system dynamics modeling has been used for various environmental concerns such as air quality, biological management, water quality and quantity. These models create a nexus of science, policy, and economic and social concerns, which enhances discussion of issues surrounding the use of natural resources. Models may be developed into educational and or decision support tools which can be used to assist with planning processes. The long-term goal of the Palouse basin project is to develop such a model. The pilot project participants include hydrologists, facility operators, policy makers and local citizens. The model they have developed integrates issues such as scientific uncertainty, groundwater volumes, and potential conservation measures and costs. Preliminary results indicate that participants are satisfied with the approach and are looking to use the model for education and to help direct potential research. We will present the results of the pilot project, including the developed model and insights from the process.

  18. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  19. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  20. Integrated Resource Planning for Urban Waste Management

    Directory of Open Access Journals (Sweden)

    Damien Giurco

    2015-01-01

    Full Text Available The waste hierarchy currently dominates waste management planning in Australia. It is effective in helping planners consider options from waste avoidance or “reduction” through to providing infrastructure for landfill or other “disposal”. However, it is inadequate for guiding context-specific decisions regarding sustainable waste management and resource recovery, including the ability for stakeholders to compare a range of options on an equal footing whilst considering their various sustainability impacts and trade-offs. This paper outlines the potential use of Integrated Resource Planning (IRP as a decision-making approach for the urban waste sector, illustrated using an Australian case study. IRP is well established in both the water and energy sectors in Australia and internationally. It has been used in long-term planning enabling decision-makers to consider the potential to reduce resource use through efficiency alongside options for new infrastructure. Its use in the waste sector could address a number of the current limitations experienced by providing a broader context-sensitive, adaptive, and stakeholder focused approach to planning not present in the waste hierarchy and commonly used cost benefit analysis. For both efficiency and new infrastructure options IRP could be useful in assisting governments to make decisions that are consistent with agreed objectives while addressing costs of alternative options and uncertainty regarding their environmental and social impacts. This paper highlights various international waste planning approaches, differences between the sectors where IRP has been used and gives a worked example of how IRP could be applied in the Australian urban waste sector.

  1. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  2. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... management planning for Indian forest land shall be carried out through participation in the development...

  3. Habitat planning, maintenance and management working group

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The Gulf of Mexico (GOM), called {open_quotes}America`s Sea,{close_quotes} is actually a small ocean basin covering over 1.5 million square kilometers. Because of the multiple uses, diversity, and size of the Gulf`s resources, management is shared by a number of governmental agencies including the Minerals Management Service, the Gulf of Mexico Fishery Management Council, the Gulf States Marine Fisheries Commission, National Marine Fisheries Service, the US Coast Guard, the US Army Corps of Engineers, and the five Gulf states fisheries agencies. All of these entities share a common goal of achieving optimum sustainable yield to maximize geological, biological, social, and economic benefits from these resources. These entities also share a common theme that the successful management of the northern GOM requires maintenance and enhancement of both the quantity and quality of habitats. A closer look at the GOM shows the sediment to be clearly dominated by vast sand and mud plains. These soft bottom habitats are preferred by many groundfish and shrimp species and, thus, have given rise to large commercial fisheries on these stocks. Hard bottom and reef habitats, on the other hand, are limited to approximately 1.6% of the total area of the Gulf, so that, while there are high demands by commercial and recreational fishermen for reef associated species, the availability of habitat for these stocks is limited. The thousands of oil and gas structures placed in the Gulf have added significant amounts of new hard substrate. The rigs-to-reefs concept was a common sense idea with support from environmental user groups and the petroleum industry for preserving a limited but valuable habitat type. As long as maximizing long-term benefits from the Gulf s resources for the greatest number of users remains the goal, then programs such as Rigs-to-Reefs will remain an important tool for fisheries and habitat managers in the Gulf.

  4. Integrating socio-economic and biophysical data to enhance watershed management and planning

    Science.gov (United States)

    Pirani, Farshad Jalili; Mousavi, Seyed Alireza

    2016-09-01

    Sustainability has always been considered as one of the main aspects of watershed management plans. In many developing countries, watershed management practices and planning are usually performed by integrating biophysical layers, and other existing layers which cannot be identified as geographic layers are ignored. We introduce an approach to consider some socioeconomic parameters which are important for watershed management decisions. Ganj basin in Chaharmahal-Bakhtiari Province was selected as the case study area, which includes three traditional sanctums: Ganj, Shiremard and Gerdabe Olya. Socioeconomic data including net agricultural income, net ranching income, population and household number, literacy rate, unemployment rate, population growth rate and active population were mapped within traditional sanctums and then were integrated into other biophysical layers. After overlaying and processing these data to determine management units, different quantitative and qualitative approaches were adopted to achieve a practical framework for watershed management planning and relevant plans for homogeneous units were afterwards proposed. Comparing the results with current plans, the area of allocated lands to different proposed operations considering both qualitative and quantitative approaches were the same in many cases and there was a meaningful difference with current plans; e.g., 3820 ha of lands are currently managed under an enclosure plan, while qualitative and quantitative approaches in this study suggest 1388 and 1428 ha to be allocated to this operation type, respectively. Findings show that despite the ambiguities and complexities, different techniques could be adopted to incorporate socioeconomic conditions in watershed management plans. This introductory approach will help to enhance watershed management decisions with more attention to societal background and economic conditions, which will presumably motivate local communities to participate in

  5. Boundaries of Consent: Stakeholder Representation in River Basin Management in Mexico and South Africa

    NARCIS (Netherlands)

    Wester, P.; Merrey, D.J.; Lange, M.

    2003-01-01

    Increasing the capacity of water users to influence decision-making is crucial in river basin management reforms. This article assesses emerging forums for river basin management in Mexico and South Africa and concludes that the pace of democratization of water management in both is slow. Mexico is

  6. Hanford site ground water protection management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities.

  7. Terrestrial forest management plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  8. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1988-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501. the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1989. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3 of the Program. The Work Plan includes schedules with key milestones for FY 1989 and beyond, and is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded projects discussed in the FY 1989 Work Plan are listed in Tables 1 and 2 according to their current status. Table 1 (pp. 3-11) lists completed, ongoing, and deferred projects. Table 2 (pp. 12-13) lists all projects which BPA plans to fund as ''new'' projects in FY 1989. ''Ongoing'' status indicates that the project started in FY 1988 or before, and that it was still being implemented by BPA at the end of FY 1988. &apos

  9. 31 CFR 206.6 - Cash management planning and review.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Cash management planning and review... planning and review. (a) An agency shall periodically perform cash management reviews to identify areas...) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE MANAGEMENT OF FEDERAL...

  10. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  11. PLANNING AND MANAGING VIRTUALIZED NEXT GENERATION NETWORKS

    Directory of Open Access Journals (Sweden)

    Sukant K. Mohapatra

    2015-11-01

    Full Text Available Service convergence, content digitization, rapid and flexible service delivery, reduction of capital and operating costs, economies of scale, changes in telecom policy and regulation, and ever increasing competition have been key factors in the evolution of virtualized Next Generation Networks (vNGN. IPcentric converged networks aim to provide a multitude of services over a single network infrastructure. Tremendous success and benefit of server virtualization in data centers is driving the adaption of network virtualization. Network virtualization is applicable to enterprise data center, and enterprise as well as wide area networks. The focus of this paper is network virtualization aspects of service providers’ next generation network. The key factors for moving to virtualized network is optimal use and sharing of network infrastructure even among competitive service providers, programmability of network and rapid introduction of new service and standard based on open platform rather than proprietary implementation. Evolving Software Defined Network (SDN and Network Function Virtualization (NFV shall enable common network infrastructure sharing, control, and management at a higher layer thus making network devices more generic and less intelligent, thus enabling cost competitiveness and quick service delivery. Network virtualization shall enable key benefits such as lower cost, flexibility, efficiency, and security, However, the deployment of virtualized next generation networks has brought its unique challenges for network managers and planners, as the network has to be planned in a comprehensive way with effective management of virtual network elements, its correlation with physical infrastructure and monitoring of control functions and server platforms. This paper discusses generic next generation network, its virtualization, and addresses the challenges related to the planning and managing of virtualized next generation networks. This

  12. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  13. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  14. Long Term Fur Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  15. Crab Orchard National Wildlife Refuge : Furbearer Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  16. Furbearer Management Plan : Rice Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Rice Lake NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  17. Back Bay National Wildlife Refuge: Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the...

  18. Bombay Hook National Wildlife Refuge Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  19. Station Management Plan Long Island National Wildlife Refuge Complex 1992

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Station Management Plan provides the Refuge Manager with three to five year guidance for managing eight National Wildlife Refuges located on Long Island, New...

  20. Habitat Management Plan - Clarks River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Habitat Management Plans (HMPs) are dynamic working documents that provide refuge managers a decision-making process; guidance for the management of the refuge’s...

  1. Marsh and Water Management Plan : Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The marsh and water management plan outlines and describes management strategies for maintenance, rehabilitation, and development of managed waters on the Clarence...

  2. Fur Management Plan: Mark Twain National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  3. 1995 Annual Water Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1995 Water Management Plan for Muscatatuck NWR begins by summarizing the 1994 Water Management Program. Management results for moist soil units, green tree...

  4. Furbearer Management Plan : Big Stone National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Stone NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  5. Benton Lake National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Benton Lake NWR Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  6. Ecology, Planning, and River Management in the United States: Some Historical Reflections

    Directory of Open Access Journals (Sweden)

    Martin Reuss

    2005-06-01

    Full Text Available River ecologists are also river-basin planners. However, their role in planning has developed slowly over the decades since the beginning of the 20th century. Three major factors explain this phenomenon. First, ecologists focused on plant and animal communities rather than on broader policy issues related to land settlement and water development. Second, the federal government, and most state and local governments as well, used mainly economic criteria to justify projects. Intangible benefits, including the value of species or an aesthetically pleasing landscape, drew relatively little attention. Third, the public generally favored development, especially during the Great Depression of the 1930s. Only after World War II did the public's position shift in favor of more preservation, as ecologists developed the concept of the ecosystem, large dam projects forced basin inhabitants from their homes, and chemical and nuclear pollutants threatened the environment. Also, urbanization increased support for the preservation of recreation sites and of streams undisturbed by human intervention. Meanwhile, partly through important advances in geomorphology and hydrology, ecologists acquired new tools to understand the land-water relationship within river basins. Neverthless, benefit-cost analysis continued to dominate federal water-resources planning, and organizational culture and competing or overlapping bureaucracies hampered rational water resources administration. Environmental groups and physical, natural, and even social scientists began to promote alternative ways to develop rivers. Today, the ideas of integrated water resources management, sustainable development, and comprehensive river-basin management dominate much of the thinking about the future course of river planning in the United States. Any future planning must include ecologists who can help their planning colleagues choose from among rational choices that balance ecological and human

  7. Watershed basin management and agriculture practices: an application case for flooding areas in Piemonte.

    Science.gov (United States)

    Bianco, G.; Franzi, L.; Valvassore, U.

    2009-04-01

    Watershed basin management in Piemonte (Italy) is a challenging issue that forces the local Authorities to a careful land planning in the frame of a sustainable economy. Different and contrasting objectives should be taken into account and balanced in order to find the best or the most "reasonable" choice under many constraints. Frequently the need for flood risk reduction and the demand for economical exploitation of floodplain areas represent the most conflicting aspects that influence watershed management politics. Actually, flood plains have been the preferred places for socio-economical activities, due to the availability of water, fertility of soil and the easiness of agricultural soil exploitation. Sometimes the bed and planform profile adjustments of a river, as a consequence of natural processes, can impede some anthropogenic activities in agriculture, such as the erosion of areas used for crops, the impossibility of water diversion, the deposition of pollutants on the ground, with effects on the economy and on the social life of local communities. In these cases watershed basin management should either balance the opposite demands, as the protection of economic activities (that implies generally canalized rivers and levees construction) and the need of favouring the river morphological stability, allowing the flooding in the inundation areas. In the paper a case study in Piemonte region (Tortona irrigation district) is shown and discussed. The effects of the Scrivia river planform adjustment on water diversion and soil erodibility force the local community and the authority of the irrigation district to ask for flood protection and river bed excavation. A mathematical model is also applied to study the effects of local river channel excavation on flood risk. Some countermeasures are also suggested to properly balance the opposite needs in the frame of a watershed basin management.

  8. Mixed Waste Focus Area program management plan

    Energy Technology Data Exchange (ETDEWEB)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  9. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  10. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans...

  11. Social network analysis on mangrove ecosystem management of Welu Basin, Thailand

    Directory of Open Access Journals (Sweden)

    Thak Thongphubate

    2016-06-01

    Full Text Available The use of social network for support mangrove ecosystem management in terms of proposed policy was studied. The results show that most samples, live in Baan Si Lamtian and Baan Paaknam Welu. Majorities of samples are women in the age range of 51-60 years old and they are fishery and have own business, respectively. The social network characteristics are the center person of the network who is the mainstay of Baan Nagoong and close-by the person on a network cultivating farmers group of Baan Si Lamtian. Two main proposed policies are hastening to the control of encroach on forests, fishing gears uses and illegal germinate aquatic animals. In addition, information including coincide planning with fishermen who set the fish traps and specify Tambon Bangchan to be the special area for aquatics management were proposed by setting the measurement with community for farm control and cultivate plot which caused shallow in the basin.

  12. Injury risk management plan for volleyball athletes.

    Science.gov (United States)

    James, Lachlan P; Kelly, Vincent G; Beckman, Emma M

    2014-09-01

    Volleyball is an increasingly popular team sport. As with any competitive sport, there is an inherent risk of injury that must be recognized and collaboratively managed. This article provides a practical approach to the management of volleyball injuries within a team or organization. A brief review of the epidemiological data is presented which establishes (i) ankle sprain, (ii) shoulder overuse injury, (iii) patella tendinopathy, and (iv) anterior cruciate ligament injury as the primary injuries to address amongst these athletes. The interaction of modifiable and non-modifiable risk factors for these injuries are used to classify athletes into high-, medium- and low-risk groups. Targeted training interventions are suggested, based upon the risk level of the athlete, to minimize the occurrence of these injuries. Practical methods for integrating these activities into a training plan are also discussed.

  13. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  14. Discussion on Landscape Ecosystem Planning of Small Basins in the Qinghai.Tibet Plateau——Taking Nieruzangbu Basin as an Example

    Institute of Scientific and Technical Information of China (English)

    HeXiao-rong; LiHui-xia; LiAi-nong; ZhouHong-yi; WangXiao-dan

    2003-01-01

    In this paper, taking Nieruzangbu as an example, it is discussed that how to plan landscapes of small basin in the Qinghai-Tibet Plateau. With analyzed the status and character of landscape structure through the use of landscape diversity indexes and landscape dominant indexes, some major problems in the landscape ecosystem are pointed out. On the basis of regional restrictive principle and compliance principle of resources, environment and economy, Nieruzangbu Basin is divided into three landscape function areas. According to the demands of each function area, landscape structure planning is carried out to improve ecological environment through optimization and adjustment of landscape structure in Nieruzangbu Basin.

  15. Discussion on Landscape Ecosystem Planning of Small Basins in the Qinghai-Tibet Plateau-Taking Nieruzangbu Basin as an Example

    Institute of Scientific and Technical Information of China (English)

    He Xiao-rong; Li Hui-xia; Li Ai-nong; Zhou Hong-yi; Wang Xiao-dan

    2003-01-01

    In this paper, taking Nieruzangbu as an example, it is discussed that how to plan landscapes of small basin in the Qinghai-Tibet Plateau. With analyzed the status and character of landscape structure through the use of landscape diversity indexes and landscape dominant indexes, some major problems in the landscape ecosystem are pointed out. On the basis of regional restrictive principle and compliance principle of resources, environment and economy, Nieruzangbu Basin is divided into three landscape function areas. According to the demands of each function area, landscape structure planning is carried out to improve ecological environment through optimization and adjustment of landscape structure in Nieruzangbu Basin.

  16. Environmental planning and management in Greater Johannesburg.

    Science.gov (United States)

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  17. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  18. HotSpot Software Configuration Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  19. Amazon dams and waterways: Brazil's Tapajós Basin plans.

    Science.gov (United States)

    Fearnside, Philip M

    2015-09-01

    Brazil plans to build 43 "large" dams (>30 MW) in the Tapajós Basin, ten of which are priorities for completion by 2022. Impacts include flooding indigenous lands and conservation units. The Tapajós River and two tributaries (the Juruena and Teles Pires Rivers) are also the focus of plans for waterways to transport soybeans from Mato Grosso to ports on the Amazon River. Dams would allow barges to pass rapids and waterfalls. The waterway plans require dams in a continuous chain, including the Chacorão Dam that would flood 18,700 ha of the Munduruku Indigenous Land. Protections in Brazil's constitution and legislation and in international conventions are easily neutralized through application of "security suspensions," as has already occurred during licensing of several dams currently under construction in the Tapajós Basin. Few are aware of "security suspensions," resulting in little impetus to change these laws.

  20. The role of Natural Flood Management in managing floods in large scale basins during extreme events

    Science.gov (United States)

    Quinn, Paul; Owen, Gareth; ODonnell, Greg; Nicholson, Alex; Hetherington, David

    2016-04-01

    There is a strong evidence database showing the negative impacts of land use intensification and soil degradation in NW European river basins on hydrological response and to flood impact downstream. However, the ability to target zones of high runoff production and the extent to which we can manage flood risk using nature-based flood management solution are less known. A move to planting more trees and having less intense farmed landscapes is part of natural flood management (NFM) solutions and these methods suggest that flood risk can be managed in alternative and more holistic ways. So what local NFM management methods should be used, where in large scale basin should they be deployed and how does flow is propagate to any point downstream? Generally, how much intervention is needed and will it compromise food production systems? If we are observing record levels of rainfall and flow, for example during Storm Desmond in Dec 2015 in the North West of England, what other flood management options are really needed to complement our traditional defences in large basins for the future? In this paper we will show examples of NFM interventions in the UK that have impacted at local scale sites. We will demonstrate the impact of interventions at local, sub-catchment (meso-scale) and finally at the large scale. These tools include observations, process based models and more generalised Flood Impact Models. Issues of synchronisation and the design level of protection will be debated. By reworking observed rainfall and discharge (runoff) for observed extreme events in the River Eden and River Tyne, during Storm Desmond, we will show how much flood protection is needed in large scale basins. The research will thus pose a number of key questions as to how floods may have to be managed in large scale basins in the future. We will seek to support a method of catchment systems engineering that holds water back across the whole landscape as a major opportunity to management water

  1. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2003-03-01

    This report presents results for year eleven in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible.

  2. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  3. Groundwater quality assessment/corrective action feasibility plan: New TNX Seepage Basin

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, R.L.

    1989-12-05

    The New TNX Seepage Basin is located across River Road east of the TNX Area at the Savannah River Site. Currently the basin is out of service and is awaiting closure in accordance with the Consent Decree settled under Civil Act No. 1:85-2583. Groundwater monitoring data from the detection monitoring network around the New TNX Seepage Basin was recently analyzed using South Carolina Hazardous Waste Management Regulations R.61-79.264.92 methods to determine if groundwater downgradient of the New TNX Seepage Basin had been impacted. Results from the data analysis indicate that the groundwater has been impacted by inorganic constituents with no associated health risks. The impacts resulting from elevated levels of inorganic constituents, such as Mn, Na, and Total PO{sub 4} in the water table, do not pose a threat to human health and the environment.

  4. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management...

  5. Transforming River Basin Management In South Africa: Lessons from the Lower Komati River

    NARCIS (Netherlands)

    Waalewijn, P.; Wester, P.; Straaten, van K.

    2005-01-01

    This paper analyzes the transformation of river basin management in South Africa by focusing on the political processes involved in the creation of new water management bodies and irrigation infrastructure in the Lower Komati sub-basin. Institutional reform is described and analyzed in terms of the

  6. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    Energy Technology Data Exchange (ETDEWEB)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and

  7. Draft Pacific Flyway management plan for the emperor goose

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to update previous versions of this plan (Pacific Flyway Council 1988) and reemphasize established goals and strategies for management of...

  8. Station Management Plan Mason Neck National Wildlife Refuge 1993

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In March 1992, a planning team met to identify issues, set objectives and develop strategies for management of the three refuges. The information from the planning...

  9. Fishery management plan: Morgan Brake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines goals and objectives recommended by the Service Fisheries Assistance program. The plan is to be used as a guide in managing the Refuge's fishery...

  10. Rocky Mountain Arsenal 5 year fish and wildlife management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This five year management plan for Rocky Mountain Arsenal National Wildlife Refuge (RMA) was developed as a dynamic planning aid to guide and prioritize annual and...

  11. Pacific Flyway management plan for the dusky Canada goose

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan for the dusky Canada goose (Branta canadensis occidentalis) is a revision of earlier plans adopted by the Pacific Flyway Council (1973, 1985,...

  12. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  13. Marsh and Water Management Plan: Back Bay National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Marsh and Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of...

  14. Fisheries Management Plan Cameron Prairie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the fisheries management plan for the refuge. This plan develops strategies and tasks for maintaining a viable fishery for Unit 8. There are other areas...

  15. Water Management Plan: Savannah National Wildlife Refuge Calendar Year 1962

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Water Management Plan for Savannah NWR for calendar year 1962. This plan includes brief habitat descriptions and specific actions for Pools 2-7A, as well as...

  16. Umatilla National Wildlife Refuge: Comprehensive Conservation Plan Management Direction

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Umatilla NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  17. Annual Water Management Plan White River National Wildlife Refuge 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  18. Bear River Migratory Bird Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Bear River Migratory Bird Refuge for the next 15 years. This plan outlines the Refuge...

  19. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  20. Annual Water Management Plan Wheeler National Wildlife Refuge 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  1. Annual Water Management Plan Wheeler National Wildlife Refuge 1998

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  2. Annual Water Management Plan Wheeler National Wildlife Refuge 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  3. Mark Twain National Wildlife Refuge : Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  4. Annual Water Management Plan Wheeler National Wildlife Refuge 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  5. Water Management Plan: Bombay Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  6. Wildland Fire Management Plan: Great River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document establishes a Fire Management Plan (FMP) for the Great River National Wildlife Refuge and for purposes of this plan includes Clarence Cannon National...

  7. Annual Water Management Plan White River National Wildlife Refuge 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  8. Tool to address green roof widespread implementation effect in flood characteristics for water management planning

    Science.gov (United States)

    Tassi, R.; Lorenzini, F.; Allasia, D. G.

    2015-06-01

    In the last decades, new approaches were adopted to manage stormwater as close to its source as possible through technologies and devices that preserve and recreate natural landscape features. Green Roofs (GR) are examples of these devices that are also incentivized by city's stormwater management plans. Several studies show that GR decreases on-site runoff from impervious surfaces, however, the analysis of the effect of widespread implementation of GR in the flood characteristics at the urban basin scale in subtropical areas are little discussed, mainly because of the absence of data. Thereby, this paper shows results related to the monitoring of an extensive modular GR under subtropical weather conditions, the development of a rainfall-runoff model based on the modified Curve Number (CN) and SCS Triangular Unit Hydrograph (TUH) methods and the analysis of large-scale impact of GR by modelling different basins. The model was calibrated against observed data and showed that GR absorbed almost all the smaller storms and reduced runoff even during the most intense rainfall. The overall CN was estimated in 83 (consistent with available literature) with the shape of hydrographs well reproduced. Large-scale modelling (in basins ranging from 0.03 ha to several square kilometers) showed that the widespread use of GRs reduced peak flows (volumes) around 57% (48%) at source and 38% (32%) at the basin scale. Thus, this research validated a tool for the assessment of structural management measures (specifically GR) to address changes in flood characteristics in the city's water management planning. From the application of this model it was concluded that even if the efficiency of GR decreases as the basin scale increase they still provide a good option to cope with urbanization impact.

  9. Turn over folders: a proven tool in succession management planning.

    Science.gov (United States)

    Engells, Thomas E

    2011-01-01

    The dual challenges of succession management and succession management planning are considerable. A tool, the Turn over Folder, was introduced and described in detail as a useful first step in succession management planning. The adoption of that tool will not in itself produce a succession management plan, but it will orientate the organization and its members to the reality of succession management in all important leadership and critical positions. Succession management is an important consideration in all progressive organizations and well worth the effort.

  10. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2004-01-01

    This report presents results for year twelve in a basin-wide program to harvest northern pikeminnow1 (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified

  11. Design Reconstitution Program Plan and procedures for K Basins

    Energy Technology Data Exchange (ETDEWEB)

    Laney, T.

    1995-01-12

    This document establishes a systematic program to establish, organize, and document the design basis and design requirement information for the K Basins where existing design information is inadequate. The Design Reconstitution Program involves identifying and retrieving design information from identified source documents; evaluating, verifying, and validating the design information; resolving discrepancies; regenerating missing critical design information; and preparing and issuing a summary document of the design information. Upon completion, the design requirements shall be evaluated with the facility as-found configuration to verify the adequacy of appropriate design requirements with the as-found configuration and to document and resolve any discovered discrepancies. Once the design requirement (design analysis, calculation, design basis) comparison is made and discrepancies resolved (dispositioned, implemented, and incorporated as required), the as-found condition of a drawing then becomes an as-built drawing that is released into the engineering release system. This as-built drawing is then the accurate accounting of the field configuration that is consistent with the design requirements (recovered through the design reconstitution program) and is used with high confidence to make valid engineering, operational, and maintenance decisions.

  12. D-area oil seepage basin bioventing optimization test plan

    Energy Technology Data Exchange (ETDEWEB)

    Berry, C.J.; Radway, J.C.; Alman, D.; Hazen, T.C.

    1998-12-31

    The D Area Oil Seepage Basin (DOSB) was used from 1952 to 1975 for disposal of petroleum-based products (waste oils), general office and cafeteria waste, and apparently some solvents [trichloroethylene (TCE)/tetrachloroethylene (PCE)]. Numerous analytical results have indicated the presence of TCE and its degradation product vinyl chloride in groundwater in and around the unit, and of petroleum hydrocarbons in soils within the unit. The DOSB is slated for additional assessment and perhaps for environmental remediation. In situ bioremediation represents a technology of demonstrated effectiveness in the reclamation of sites contaminated with petroleum hydrocarbons and chlorinated solvents, and has been retained as an alternative for the cleanup of the DOSB. The Savannah River Site is therefore proposing to conduct a field treatability study designed to demonstrate and optimize the effectiveness of in situ microbiological biodegradative processes at the DOSB. The introduction of air and gaseous nutrients via two horizontal injection wells (bioventing) is expected to enhance biodegradation rates of petroleum components and stimulate microbial degradation of chlorinated solvents. The data gathered in this test will allow a determination of the biodegradation rates of contaminants of concern in the soil and groundwater, allow an evaluation of the feasibility of in situ bioremediation of soil and groundwater at the DOSB, and provide data necessary for the functional design criteria for the final remediation system.

  13. Developing a Sand Management Plan for Galveston Island

    Science.gov (United States)

    2015-10-16

    US Army Corps of Engineers BUILDING STRONG® Developing a Sand Management Plan for Galveston Island Ashley E. Frey, P. E. Research Civil...GenCade Alternatives • Sand Management Alternatives and Plan • Beach Nourishment Project 2 Innovative solutions for a safer, better world...BUILDING STRONG® Problem Statement/Approach Recommend a long-term plan of actions to better manage sands on Galveston Island Initial Tasks

  14. Urban Land Use Classifcation Linked to Planning Management

    Institute of Scientific and Technical Information of China (English)

    QI Dongjin; ZHOU Jianyun; SHI Ke

    2012-01-01

    By analyzing the applicability of the new Code for Classification of Urban Land Use and Planning Standards of Development Land from the angle of planning management,this paper points out the conflicts between the planning and land use management institutions.Referring to the experience of land use control in the US and the UK through zoning and case law respectively,this paper puts forward that the urban land use classification should take into consideration the characteristics of the actual urban planning system and the possibility of mixed land use due to the uncertainty of urban development,and be linked to the institutions of planning and land supply management.

  15. Information technology and decision support tools for stakeholder-driven river basin salinity management

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, N.W.T; Cozad, D.B.; Lee, G.

    2010-01-01

    Innovative strategies for effective basin-scale salinity management have been developed in the Hunter River Basin of Australia and more recently in the San Joaquin River Basin of California. In both instances web-based stakeholder information dissemination has been a key to achieving a high level of stakeholder involvement and the formulation of effective decision support salinity management tools. A common element to implementation of salinity management strategies in both river basins has been the concept of river assimilative capacity for controlling export salt loading and the potential for trading of the right to discharge salt load to the river - the Hunter River in Australia and the San Joaquin River in California. Both rivers provide basin drainage and the means of exporting salt to the ocean. The paper compares and contrasts the use of monitoring, modeling and information dissemination in the two basins to achieve environmental compliance and sustain irrigated agriculture in an equitable and socially and politically acceptable manner.

  16. Scaling issues in multi-criteria evaluation of combinations of measures for integrated river basin management

    Science.gov (United States)

    Dietrich, Jörg

    2016-05-01

    In integrated river basin management, measures for reaching the environmental objectives can be evaluated at different scales, and according to multiple criteria of different nature (e.g. ecological, economic, social). Decision makers, including responsible authorities and stakeholders, follow different interests regarding criteria and scales. With a bottom up approach, the multi criteria assessment could produce a different outcome than with a top down approach. The first assigns more power to the local community, which is a common principle of IWRM. On the other hand, the development of an overall catchment strategy could potentially make use of synergetic effects of the measures, which fulfils the cost efficiency requirement at the basin scale but compromises local interests. Within a joint research project for the 5500 km2 Werra river basin in central Germany, measures have been planned to reach environmental objectives of the European Water Framework directive (WFD) regarding ecological continuity and nutrient loads. The main criteria for the evaluation of the measures were costs of implementation, reduction of nutrients, ecological benefit and social acceptance. The multi-criteria evaluation of the catchment strategies showed compensation between positive and negative performance of criteria within the catchment, which in the end reduced the discriminative power of the different strategies. Furthermore, benefit criteria are partially computed for the whole basin only. Both ecological continuity and nutrient load show upstream-downstream effects in opposite direction. The principles of "polluter pays" and "overall cost efficiency" can be followed for the reduction of nutrient losses when financial compensations between upstream and downstream users are made, similar to concepts of emission trading.

  17. Towards an optimal integrated reservoir system management for the Awash River Basin, Ethiopia

    Science.gov (United States)

    Müller, Ruben; Gebretsadik, Henok Y.; Schütze, Niels

    2016-05-01

    Recently, the Kessem-Tendaho project is completed to bring about socioeconomic development and growth in the Awash River Basin, Ethiopia. To support reservoir Koka, two new reservoirs where built together with extensive infrastructure for new irrigation projects. For best possible socioeconomic benefits under conflicting management goals, like energy production at three hydropower stations and basin wide water supply at various sites, an integrated reservoir system management is required. To satisfy the multi-purpose nature of the reservoir system, multi-objective parameterization-simulation-optimization model is applied. Different Pareto-optimal trade-off solutions between water supply and hydro-power generation are provided for two scenarios (i) recent conditions and (ii) future planned increases for Tendaho and Upper Awash Irrigation projects. Reservoir performance is further assessed under (i) rule curves with a high degree of freedom - this allows for best performance, but may result in rules curves to variable for real word operation and (ii) smooth rule curves, obtained by artificial neuronal networks. The results show no performance penalty for smooth rule curves under future conditions but a notable penalty under recent conditions.

  18. Neutralized current acid waste consolidation management plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, W.J.; Brown, R.G.; Galbraith, J.; Jensen, C.; Place, D.E.; Reddick, G.W.; Zuroff, W. [Westinghouse Hanford Co., Richland, WA (United States); Brothers, A.J. [Pacific Northwest National Lab., Richland, WA (United States)

    1996-01-01

    The scope of this evaluation is to recommend a management plan for the high-heat tank waste, including neutralized current acid waste (NCAW) in AY and AZ Tank Farms, and tank C-106 waste. The movement of solids, liquids and salt cake in the designated tank farms is included. Decision analysis techniques were used to determine a recommended alternative. The recommended course of action was replacement of a 75-hp mixer pump in tank AY-102 and in-tank concentration of tank AZ-102 supernate. The alternative includes transfer fo tank C-106 sludge to tank AY-102, then transfer to tank AY-102 and tank C-106 sludge to tank AZ-101 using the new 75-hp mixer pump installed in tank AY-102. Tank AZ-101 becomes a storage tank for high-level waste (HLW) sludge, with the capacity to mix and transfer sludge as desired.

  19. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  20. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  1. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  2. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  3. Measuring the Sustainability of Water Plans in Inter-Regional Spanish River Basins

    Directory of Open Access Journals (Sweden)

    María M. Borrego-Marín

    2016-08-01

    Full Text Available This paper analyses and compares the sustainability of the water plans in the Spanish River basins according to the objectives of the Water Framework Directive. Even though the concept of sustainability has been traditionally associated with the triple bottom line framework, composed of economic, environmental, and social dimensions, in this paper sustainability has been enlarged by including governance aspects. Two multicriteria decision analysis approaches are proposed to aggregate the sustainability dimensions. Results show that the environmental dimension plays the most important role in the whole sustainability (40% of water basins, followed by both economic and social criteria (25%. By contrast, the dimension of governance is the least important for sustainability (11%. A classification of the Spanish basins according to their sustainability indicates that the water agency with the highest sustainability is Western Cantabrian, followed by Eastern Cantabrian and Tagus. By contrast, Minho-Sil, Jucar, and Douro are the least sustainable.

  4. A groundwater management plan for Stuttgart.

    Science.gov (United States)

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater.

  5. Elements for an integrated resource planning in the framework of river basins: a study for the Cuiaba River Basin; Elementos para um planejamento integrado de recursos no ambito de bacias hidrograficas: um estudo para a bacia do rio Cuiaba

    Energy Technology Data Exchange (ETDEWEB)

    Dorileo, Ivo Leandro; Bajay, Sergio Valdir [Universidade Estadual de Campinas (NIPE/UNICAMP), SP (Brazil). Nucleo Interdisciplinar de Planejamento Energetico. Dept. de Energia], e-mail: ildorileo@sigmanet.com.br, e-mail: bajay@fem.unicamp.br

    2008-07-01

    A new approach in energy planning in Brazil, IRP - Integrated Resources Planning for River Basins, gathers three main determinants of development: water, electricity and piped gas. This paper argues, briefly, the need of this planning, of indicative character, integrated with the River Basin Plans, and it presents a retrospective analysis concerning water, electricity and LPG demands of the economy sectors from Cuiaba River Basin region, priority elements to aid the prospective studies and to carry out process related to the IRP. (author)

  6. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Glaser, Bryce G.; Amren, Jennifer

    2003-03-01

    This report presents results for year ten in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified

  7. KNOWLEDGE MANAGEMENT AND ENTERPRISE RESOURCE PLANNING IMPLEMENTATION: A CONCEPTUAL MODEL

    Directory of Open Access Journals (Sweden)

    Sevenpri Candra

    2014-01-01

    Full Text Available The purpose of this research is examining the influence of organizational learning and knowledge management in enterprise resource planning implementation. This study is based on organizational learning, knowledge management and enterprise resource planning implementation. This research did not test all organizational factors and focus particularly on knowledge management capacity and absorptive capability. Enterprise resource planning implementation successful is a must. In today’s global and competitor in business, enterprise resource planning is becoming one of the main tools to achieve competitiveness in business. Enterprise resource planning is an infrastructure to create and maintain business to improve front-office and back-office efficiency and effectiveness. This study is significant to bring new thinking in determines the key antecedents to successful enterprise resource planning implementation based on knowledge management perspectives and it will helps to understand the key success factor in enterprise resource planning implementation.

  8. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained prominenc

  9. Water Management Plan for Iroquois National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — As of the date of this plan, development permits the control of water on 1,354 acres of major pools within the swampland basin, and on 449 acres of upland marshes on...

  10. 77 FR 14568 - Environmental Impact Statement for Proposed General Management Plan, Pinnacles National Monument...

    Science.gov (United States)

    2012-03-12

    ... analysis for this general management planning effort. SUPPLEMENTARY INFORMATION: This new GMP will update... planning process to date, the NPS planning team developed four preliminary alternatives for the management... National Park Service Environmental Impact Statement for Proposed General Management Plan,...

  11. Fort Niobrara National Wildlife Refuge River Recreation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Fort Niobrara National Wildlife Refuge River Recreation Management Plan is to provide guidance and direction for management of recreational...

  12. Merritt Island National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Merritt Island NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  13. Habitat Management Plan for Atchafalaya National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Atchafalaya NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Atchafalaya NWR,...

  14. Habitat Management Plan for Roanoke River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Roanoke River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Roanoke River...

  15. Grassland Management Plan Wertheim National Wildlife Refuge 1989

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan for Wertheim National Wildlife Refuge is presented as an interim document to provide refuge staff in 1989 with management guidelines...

  16. Prime Hook National Wildlife Refuge Fire Management Plan 2002

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Department of the Interior fire management policy requires that all national wildlife refuges with vegetation that can sustain fire have a Fire Management Plan...

  17. Moose/Habitat Management Plan : [Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kenai NWR Moose/Habitat Management Plan was developed to guide future FWS management of moose/habitat on Kenai NWR. The present status and trend of Kenai NWR...

  18. Rocky Mountain Arsenal National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Habitat Management Plan identifies important wildlife resources on the Rocky Mountain Arsenal National Wildlife Refuge and the management strategies that will...

  19. Habitat Management Plan for Pond Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pond Creek National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  20. Integrated Pest Management Plan for Sand Lake NWR Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Sand Lake WMD. The...

  1. Two Ponds National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan will provide the framework for making decisions on conserving natural, cultural, and recreational resources, managing visitor use,...

  2. Refuge Management Plan, Part III : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Management Plan for Agassiz NWR provides an overview of the Management Program. Outputs include endangered species maintenance, waterfowl production, waterfowl...

  3. Aquatic management plan : [Rocky Mountain Arsenal National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The aquatic management plan for Rocky Mountain Arsenal National Wildlife Refuge (Refuge) provides management direction and guidance to ensure the conservation of...

  4. Integrated Pest Management Plan Medicine Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Medicine Lake NWR. The...

  5. Integrated Pest Management Plan - Fish Springs National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Fish Springs NWR. The...

  6. Forest Management Plan Blackwater National Wildlife Refuge 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan will be geared mainly toward habitat management of refuge woodlands to benefit and/or protect the endangered Bald Eagle and the Delmarva...

  7. Fishery Management Plan Kenai National Wildlife Refuge FY 1996 - 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Fishery Management Plan for the Kenai National Wildlife Refuge for the Kenai National Wildlife Refuge provides management direction necessary to ensure...

  8. Habitat Management Plan for Bayou Cocodrie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Cocodrie NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Cocodrie...

  9. Habitat Management Plan for Tennessee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tennessee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Tennessee NWR, to...

  10. Bayou Sauvage National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Sauvage NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Sauvage...

  11. Pocosin Lakes National Wildlife Refuge : 2006 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  12. Pocosin Lakes National Wildlife Refuge : 2004 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  13. Pocosin Lakes National Wildlife Refuge : 2000 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2000 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  14. Pocosin Lakes National Wildlife Refuge : 2002 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2002 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  15. Pocosin Lakes National Wildlife Refuge : 2003 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2003 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  16. Pocosin Lakes National Wildlife Refuge : 2001 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2001 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  17. Pocosin Lakes National Wildlife Refuge : 1999 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1999 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  18. Louisa District Mark Twain NWR : Grassland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain National Wildlife Refuge- Louisa District Grassland Management Plan addresses management strategies to provide habitat and food for waterfowl and...

  19. Arrowwood National Wildlife Refuge Complex Integrated Pest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Arrowwood NWRC. The...

  20. Integrated Pest Management Plan Ouray National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Ouray NWR. The goals...

  1. Arapaho National Wildlife Refuge Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Arapaho National...

  2. Handy Brake National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Handy Brake National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  3. Cameron Prairie National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Cameron Prairie National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  4. Moist Soil Management Plan : Hatchie National Wildlife Refuge : 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This moist soil management plan for Hatchie National Wildlife Refuge covers the 1982 management and manipulation of seasonally flooded wetlands to produce a mudflat...

  5. Integrated Pest Management Plan Browns Park National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Browns Park National...

  6. Grassland Management Plan Erie National Wildlife Refuge 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan provides well defined guidelines to accomplish the following goals at Erie National Wildlife Refuge : 1) to manage existing grasslands, 2)...

  7. Panther Swamp National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Panther Swamp National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  8. Bombay Hook National Wildlife Refuge Cropland Management Plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  9. Bombay Hook National Wildlife Refuge Cropland Management Plan 1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  10. Bombay Hook National Wildlife Refuge Cropland Management Plan 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  11. Fire Managment Plan Presquile National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document establishes a Fire Management Plan for Presquile National Wildlife Refuge. It relates to existing land management policy, however, comprehensive...

  12. Habitat Management Plan for Carolina Sandhills National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Carolina Sandhills NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Carolina...

  13. Modoc National Wildlife Refuge annual water management plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1980, recommended water management for 1981, and...

  14. Modoc National Wildlife Refuge annual water management plan 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1981, recommended water management for 1982, and...

  15. Management Plan : Parts I & II : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parts I and II of the Management Plan for Tamarac NWR summarize the location, history, environment, resources, administration, land status, and current management...

  16. Red River National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Red River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  17. Habitat Management Plan for Lake Ophelia National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lake Ophelia NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Lake Ophelia NWR,...

  18. Habitat Management Plan for Black Bayou Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Black Bayou Lake NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Black Bayou...

  19. Rocky Mountain Arsenal National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan will provide the framework for making decisions on conserving natural, cultural, and recreational resources, managing visitor use,...

  20. Cypress Creek National Wildlife Refuge: Comprehensive Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Management Plan (CMP) for Cypress Creek National Wildlife Refuge (NWR) was prepared to guide management direction of the Refuge over the next 15...

  1. Habitat Management Plan for Delta and Breton National Wildlife Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Delta and Breton NWRs Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Delta and...

  2. Bayou Teche National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bayou Teche NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bayou Sauvage NWR,...

  3. Great River & Clarence Cannon National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Great River and Clarence Cannon NWRs Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  4. Habitat Management Plan for Tensas River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tensas River NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Tensas River NWR,...

  5. Habitat Management Plan for St. Marks National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The St. Marks NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at St. Marks NWR, to...

  6. Habitat Management Plan Squaw Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Squaw Creek National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  7. Habitat Management Plan for Bogue Chitto National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bogue Chitto NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Bogue Chitto NWR,...

  8. Big Branch Marsh National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Branch National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  9. Mountain Longleaf National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mountain Longleaf National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  10. Habitat Management Plan for Pee Dee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Pee Dee NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Pee Dee NWR, to...

  11. Occoquan Bay National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Occoquan Bay National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  12. Merritt Island National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Merritt Island National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  13. Cape May National Wildlife Refuge Station Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Station Management Plan for Cape May National Wildlife Refuge provides the Refuge Manager with one to three year guidance for 1) acquiring or otherwise...

  14. Agassiz National Wildlife Refuge : Marsh and Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Marsh and Water Management Plan (MWMP) is intended to guide the management of Agassiz NWR wetlands into the twenty-first century. The foundation on which this...

  15. Habitat Management Plan for Logan Cave National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Logan Cave NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at Logan Cave NWR, to...

  16. Cahaba River National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Cahaba River National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  17. D'Arbonne National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The D'Arbonne National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  18. Upper Ouachita National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Ouachita National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  19. John Heinz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The John Heinz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  20. A Timber Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan for Mingo National Wildlife Refuge describes how forest management techniques will be used to fulfill refuge objectives. A history and...

  1. Grand Cote National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Grand Cote NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  2. Two Rivers National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Two Rivers National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  3. Bon Secour National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bon Secour National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  4. Management Plan Parts I and II : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Management Plan for Agassiz NWR summarizes the refuge objectives, history, resources, land status, and administration of the Refuge. Objectives and management...

  5. Fishery Management Plan : Ottawa National Wildlife Refuge Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fishery Management Plan for Ottawa NWR provides an overview of the relationship between fishery management and Refuge objectives. Wildlife use and production...

  6. [Draft] Fishery Management Plan : Valentine National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fishery management plan for Valentine National Wildlife Refuge has objectives and strategies for fish management that are in agreement with the background and...

  7. Pocosin Lakes National Wildlife Refuge : 2005 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2005 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  8. Wilderness management plan : Monomoy National Wildlife Refuge : Monomoy Wilderness

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Monomoy Wilderness. After introducing the area, it analyzes current management practices against current public...

  9. St. Vincent National Wildlife Refuge : Timber Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Timber Management Plan for St. Vincent National Wildlife Refuge describes how forest management techniques will be used to fulfill refuge objectives. Two types...

  10. Water resource systems planning and management an introduction to methods, models, and applications

    CERN Document Server

    Loucks, Daniel P

    2017-01-01

    This book is open access under a CC BY-NC 4.0 license. This revised, updated textbook presents a systems approach to the planning, management, and operation of water resources infrastructure in the environment. Previously published in 2005 by UNESCO and Deltares (Delft Hydraulics at the time), this new edition, written again with contributions from Jery R. Stedinger, Jozef P. M. Dijkman, and Monique T. Villars, is aimed equally at students and professionals. It introduces readers to the concept of viewing issues involving water resources as a system of multiple interacting components and scales. It offers guidelines for initiating and carrying out water resource system planning and management projects. It introduces alternative optimization, simulation, and statistical methods useful for project identification, design, siting, operation and evaluation and for studying post-planning issues. The authors cover both basin-wide and urban water issues and present ways of identifying and evaluating alternatives for ...

  11. 78 FR 17643 - Greater Mississippi River Basin Water Management Board; Engineer Regulation No. 15-2-13

    Science.gov (United States)

    2013-03-22

    ... Department of the Army, U.S. Army Corps of Engineers Greater Mississippi River Basin Water Management Board... Corps Greater Mississippi River Basin Water Management Board. It is applicable to all Corps offices involved with water management within the Greater Mississippi River Basin. The Board consists of the...

  12. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  13. A Heuristic Dynamically Dimensioned Search with Sensitivity Information (HDDS-S) and Application to River Basin Management

    OpenAIRE

    Jinggang Chu; Yong Peng; Wei Ding; Yu Li

    2015-01-01

    River basin simulation and multi-reservoir optimal operation have been critical for river basin management. Due to the intense interaction between human activities and river basin systems, the river basin model and multi-reservoir operation model are complicated with a large number of parameters. Therefore, fast and stable optimization algorithms are required for river basin management under the changing conditions of climate and current human activities. This study presents a new global opti...

  14. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Lesson Planning Task 1 As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need to be included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasons why we need to plan our lessons.

  15. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Lesson PlanningTask 1As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need tobe included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasonswhy we need to plan our lessons.

  16. FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

    Energy Technology Data Exchange (ETDEWEB)

    Hamling, John; Klapperich, Ryan; Stepan, Daniel; Sorensen, James; Pekot, Lawrence; Peck, Wesley; Jacobson, Lonny; Bosshart, Nicholas; Hurley, John; Wilson, William; Kurz, Marc; Burnison, Shaughn; Salako, Olarinre; Musich, Mark; Botnen, Barry; Kalenze, Nicholas; Ayash, Scott; Ge, Jun; Jiang, Tao; Dalkhaa, Chantsalmaa; Oster, Benjamin; Peterson, Kyle; Feole, Ian; Gorecki, Charles; Steadman, Edward

    2016-03-31

    The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1987-1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide Bonneville Power Administration (BPA) in carrying out our responsibility to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gave BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife were affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for Program implementation during Fiscal Year (FY) 1988. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Program's Action Plan: to provide a solid, timely, and focused basis for budgeting and planning. Additionally, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3. It includes schedules with key milestones for FY 1988 through FY 1990. The Work Plan is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program.

  18. Nulhegan Deer Wintering Area Management Plan 1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Within the Nulhegan basin lies the Nulhegan Deer Wintering Area, an approximately 15,000-acre tract of land. In addition to being the largest deer wintering area in...

  19. The 'WaterWare' decision-support system for river-basin planning. 3. Example applications

    Science.gov (United States)

    Jamieson, D. G.; Fedra, K.

    1996-04-01

    Having outlined the conceptual design and planning capability in the previous two papers, the final contribution in this trilogy describes the application of WaterWare to the River Thames basin in England and Rio Lerma in Mexico. Examples are given of the real-world problems that can be addressed using this system. These include water-resource assessment, reservoir site selection, decontamination of groundwater, estimation of sustainable irrigation abstractions and derivation of required effluent-quality standards. The requirement in both cases is to provide the analytical tools to be used by the agency staff themselves for planning purposes.

  20. Comprehensive Plan for Rehabilitation of Anadromous Fish Stocks in the Umatilla River Basin, 1985 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Boyce, Raymond R.

    1986-01-01

    The goals of the project were to: establish fishery rehabilitation objectives for naturally and hatchery produced salmonids in the Umatilla Basin; estimate potential benefits of each of the rehabilitation and flow enhancement projects to naturally and hatchery produced salmonids; and develop a plan to set priorities, implement, and evaluate projects that will achieve rehabilitation objectives. This document identifies fishery needs, quantifies the contribution of proposed fishery projects under present and enhanced flows, provides cost estimates for projects, and provides a plan for prioritization, implementation, and evaluation of projects.

  1. Tidal River Management (TRM and Tidal Basin Management (TBM: A case study on Bangladesh

    Directory of Open Access Journals (Sweden)

    Talchabhadel Rocky

    2016-01-01

    Full Text Available Bangladesh is the biggest delta of the world. Construction of numbers of polders is one of the flood resilient approach. But the presence of coastal polders de-linked the flood plain. The siltation in river causes riverbeds to become higher than the adjacent crop lands, and vast area under the polders became permanently water logged rendering large tract of land uncultivable. The current practice is temporarily de-poldering by cutting embankment. This is a natural water management process with very little human interventions but it needs strong participation and consensus with a great deal of sacrifice by the stakeholders for a specific period (3 to 5 years or even more[1]. An attempt has been made to study the phenomena of tidal basin management reviewing some secondary data and processes involved in successfully operated tidal basins of Bangladesh. And preliminary laboratory experiments are carried out to precisely look into the suspended sediment transport. With varying outflow discharge and sediment supply, the transport processes are investigated. 3D sediment transport model developed using openFOAM has good agreement with experimental result and can be used to better understand effectiveness of tidal basin management.

  2. Succession planning for RNs: implementing a nurse management internship.

    Science.gov (United States)

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  3. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  4. Risk management plans as a tool for proactive pharmacovigilance

    DEFF Research Database (Denmark)

    Vermeer, N S; Duijnhoven, R G; Straus, S M J M;

    2014-01-01

    Risk Management Plans (RMPs) have become a cornerstone in the pharmacovigilance of new drugs in Europe. The RMP was introduced in 2005 to support a proactive approach in gaining knowledge on safety concerns through early planning of pharmacovigilance activities. However, the rate at which...... of uncertainties, suggests that opportunities for optimization exist while ensuring feasible and risk-proportionate pharmacovigilance planning....

  5. Uranium Mill Tailings Remedial Action Project surface project management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  6. Issues of governance in water resource management and spatial planning

    NARCIS (Netherlands)

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial ma

  7. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water...

  8. 40 CFR 262.214 - Laboratory management plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Laboratory management plan. 262.214... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain...

  9. Montana's Clark Fork River Basin Task Force: a vehicle for integrated water resources management?

    Science.gov (United States)

    Shively, David D; Mueller, Gerald

    2010-11-01

    This article examines what is generally considered to be an unattainable goal in the western United States: integrated water resources management (IWRM). Specifically, we examine an organization that is quite unique in the West, Montana's Clark Fork River Basin Task Force (Task Force), and we analyze its activities since its formation in 2001 to answer the question: are the activities and contributions of the Task Force working to promote a more strongly integrated approach to water resources management in Montana? After reviewing the concepts underlying IWRM, some of the issues that have been identified for achieving IWRM in the West, and the Montana system of water right allocation and issues it faces, we adapt Mitchell's IWRM framework and apply it to the analysis of the Task Force's activities in the context of IWRM. In evaluating the physical, interaction, and protocol/planning/policy components of IWRM, we find that the Task Force has been contributing to the evolution of Montana's water resources management towards this framework, though several factors will likely continue to prevent its complete realization. The Task Force has been successful in this regard because of its unique nature and charge, and because of the authority and power given it by successive Montana legislatures. Also critical to the success of the organization is its ability to help translate into policy the outcomes of legal and quasi-judicial decisions that have impacted the state's water resources management agency.

  10. Planning among nurse managers in district hospitals in Ghana.

    Science.gov (United States)

    Asamani, James Avoka; Kwafo, Esther Oforiwaa; Ansah-Ofei, Adelaide Maria

    2013-12-01

    This article reports the results of a study that explored the planning practices of nurse managers at ward level, their knowledge of planning process and the factors that influence effective planning. Although the practice of planning was almost universal, half the participants had no knowledge of the process, and this knowledge gap was traced to a lack of educational preparation before their appointment. In-service training, support from management and staff, and funding were identified as major factors influencing effective planning at ward level. The authors recommend that prospective nurse managers have educational preparation before they take up these positions and nurse managers already in post have capacity-building training in planning.

  11. Reserve network planning for fishes in the middle and lower Yangtze River basin by systematic conservation approaches.

    Science.gov (United States)

    Huang, Xinyi; Li, Fan; Chen, Jiakuan

    2016-03-01

    Although China has established more than 600 wetland nature reserves, conservation gaps still exist for many species, especially for freshwater fishes. Underlying this problem is the fact that top-level planning is missing in the construction of nature reserves. To promote the development of nature reserves for fishes, this study took the middle and lower reaches of the Yangtze River basin (MLYRB) as an example to carry out top-level reserve network planning for fishes using approaches of systematic conservation planning. Typical fish species living in freshwater habitats were defined and considered in the planning. Based on sample data collected from large quantities of literatures, continuous distribution patterns of 142 fishes were obtained with species distribution modeling and subsequent processing, and the distributions of another eleven species were artificially designated. With the distribution pattern of species, Marxan was used to carry out conservation planning. To obtain ideal solutions with representativeness, persistence, and efficiency, parameters were set with careful consideration regarding existing wetland reserves, human disturbances, hydrological connectivity, and representation targets of species. Marxan produced the selection frequency of planning units (PUs) and a best solution. Selection frequency indicates the relative protection importance of a PU. The best solution is a representative of ideal fish reserve networks. Both of the PUs with high selection frequency and those in the best solution have low proportions included in existing wetland nature reserves, suggesting that there are significant conservation gaps for fish species in MLYRB. The best solution could serve as a reference for establishing a fish reserve network in the MLYRB. There is great flexibility for replacing selected PUs in the solution, and such flexibility facilitates the implementation of the solution in reality in case of unexpected obstacles. Further, we suggested

  12. Croplands management plan: Wheeler National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan updates the agricultural portion of the Land Use Plan prepared and signed by C. M. Parker August 7, 1958 and revised March 3, 1959. A description of the...

  13. TWRS systems engineering software configuration management plan

    Energy Technology Data Exchange (ETDEWEB)

    Porter, P.E.

    1996-10-09

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  14. Program Planning Concepts in Solid Waste Management

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  15. Strategic Planning and Army Installation Management.

    Science.gov (United States)

    1996-01-01

    program. The U.S. Army has adopted the Malcolm Baldrige National Quality Award criteria for use in the ACOE program. Strategic planning is one of the...seven pillars of the Baldrige criteria. The Army has recognized that strategic planning is the key to the future. Strategic planning is the key to...and utilization of strategic planning . This paper examines through case study analysis several civilian communities and lessons learned through their

  16. Prescriptions for adaptive comanagement: the case of flood management in the German Rhine basin

    Directory of Open Access Journals (Sweden)

    Gert Becker

    2015-09-01

    Full Text Available Centrally administered bureaucracies are ill suited to managing the environmental resources of complex social-ecological systems. Therefore management approaches are required that can better deal with its complexity and uncertainty, which are further exacerbated by developments such as climate change. Adaptive comanagement (ACM has emerged as a relatively novel governance approach and potential solution to the challenges arising. Adaptive comanagement hinges on certain institutional prescriptions intended to enhance the adaptability of management by improving the comprehension of and response to the complex context and surprises of social-ecological systems. The ACM literature describes that for enhanced adaptability, institutional arrangements should be polycentric, aligned with the scale of ecosystems (the bioregional approach, feature open and participatory governance, and involve much experimentation. The case of flood management in the German part of the Rhine basin is used to provide an assessment of these ideas. We analyze whether and to what degree the prescriptions have been implemented and whether or not certain fundamental changes seen in German flood management can be traced back to the application of the prescriptions. Our study demonstrates a transition from the traditional engineering and "flood control" approach to a more holistic management concept based on a risk perspective. In this process, the four ACM prescriptions have made an important contribution in preparing or facilitating policy changes. The findings suggest that the application of the prescriptions requires the right supporting context before they can be applied to the fullest extent possible, such as a high problem pressure, new discourses, or leading actors. A major constraint arises in the misalignment of political power and of the different interests of the actors, which contribute to reactive management and inadequate interplay. To address this, we recommend

  17. Hydrological effects of water management measures in the Dovine River basin, Lithuania

    NARCIS (Netherlands)

    Querner, E.P.; Povilaitis, A.

    2009-01-01

    Lake Žuvintas, located in southern Lithuania in the Dovine River basin, is one of the largest lakes and oldest nature reserves in the country. However, changes in the hydrology of the Dovine River basin, caused by large-scale land reclamation and water management works carried out in the 20th centur

  18. A comparison of integrated river basin management strategies: A global perspective

    Science.gov (United States)

    Zhao, Chunhong; Wang, Pei; Zhang, Guanghong

    In order to achieve the integrated river basin management in the arid and rapid developing region, the Heihe River Basin (HRB) in Northwestern China, one of critical river basins were selected as a representative example, while the Murray-Darling Basin (MDB) in Australia and the Colorado River Basin (CRB) in the USA were selected for comparative analysis in this paper. Firstly, the comparable characters and hydrological contexts of these three watersheds were introduced in this paper. Then, based on comparative studies on the river basin challenges in terms of the drought, intensive irrigation, and rapid industrialization, the hydrological background of the MDB, the CRB and the HRB was presented. Subsequently, the river management strategies were compared in three aspects: water allocation, water organizations, and water act and scientific projects. Finally, we proposed recommendations for integrated river basin management for the HRB: (1) Water allocation strategies should be based on laws and markets on the whole basin; (2) Public participation should be stressed by the channels between governance organizations and local communities; (3) Scientific research should be integrated into river management to understand the interactions between the human and nature.

  19. Rational versus adaptive forest management planning: exploratory research on the strategic planning practices of Dutch forest management organizations

    NARCIS (Netherlands)

    Hoogstra-Klein, M.A.; Burger, M.

    2013-01-01

    The long-running debate between the rational and the adaptive school of strategic forest management planning has received considerable attention. There is, however, little empirical evidence of whether and how forest management organizations actually plan strategically. The goal of this paper is to

  20. The European flood risk management plan : Between spatial planning and water engineering

    NARCIS (Netherlands)

    Hartmann, Thomas; Juepner, R.

    2014-01-01

    In response to the extreme flood events of recent decades, the European Floods Directive (2007/60/EC) requires Member States of the European Union to develop Flood Risk Management Plans (Dworak & Görlach 2005). These plans need to be in place by 2015 and set‘appropriate objectives for the management

  1. Planning an Agricultural Water Resources Management System: A Two-Stage Stochastic Fractional Programming Model

    Directory of Open Access Journals (Sweden)

    Liang Cui

    2015-07-01

    Full Text Available Irrigation water management is crucial for agricultural production and livelihood security in many regions and countries throughout the world. In this study, a two-stage stochastic fractional programming (TSFP method is developed for planning an agricultural water resources management system under uncertainty. TSFP can provide an effective linkage between conflicting economic benefits and the associated penalties; it can also balance conflicting objectives and maximize the system marginal benefit with per unit of input under uncertainty. The developed TSFP method is applied to a real case of agricultural water resources management of the Zhangweinan River Basin China, which is one of the main food and cotton producing regions in north China and faces serious water shortage. The results demonstrate that the TSFP model is advantageous in balancing conflicting objectives and reflecting complicated relationships among multiple system factors. Results also indicate that, under the optimized irrigation target, the optimized water allocation rate of Minyou Channel and Zhangnan Channel are 57.3% and 42.7%, respectively, which adapts the changes in the actual agricultural water resources management problem. Compared with the inexact two-stage water management (ITSP method, TSFP could more effectively address the sustainable water management problem, provide more information regarding tradeoffs between multiple input factors and system benefits, and help the water managers maintain sustainable water resources development of the Zhangweinan River Basin.

  2. Ecosystem services and water resource management in a small scale river basin characterized by ponds and wetlands: Fizeş River(Romania

    Directory of Open Access Journals (Sweden)

    Cristian V. Maloş

    2008-09-01

    Full Text Available Water resource management can prove to be a very difficult task. It is not an easy job trying to fulfill the current requirements of the Water Framework Directive1 (WFD 2000/60/EC especially because it is difficult to estimate what really ?good status? means according with WFD. In order to reach the ?good status? in a particular river basin the water manager needs to propose a so called Program of Measures, which identifies and proposes measures to be taken in order to lower the impact generated by human activities. All these measures are based on an evaluation of the supposed natural status and current status in the river basin. What we try to propose here is a model for an tegrated management plan approach based both on the natural functionality of the river but also on the ecosystem services and social functionalities generated by man made ponds in the river basin.

  3. Water accounting for stressed river basins based on water resources management models.

    Science.gov (United States)

    Pedro-Monzonís, María; Solera, Abel; Ferrer, Javier; Andreu, Joaquín; Estrela, Teodoro

    2016-09-15

    Water planning and the Integrated Water Resources Management (IWRM) represent the best way to help decision makers to identify and choose the most adequate alternatives among other possible ones. The System of Environmental-Economic Accounting for Water (SEEA-W) is displayed as a tool for the building of water balances in a river basin, providing a standard approach to achieve comparability of the results between different territories. The target of this paper is to present the building up of a tool that enables the combined use of hydrological models and water resources models to fill in the SEEA-W tables. At every step of the modelling chain, we are capable to build the asset accounts and the physical water supply and use tables according to SEEA-W approach along with an estimation of the water services costs. The case study is the Jucar River Basin District (RBD), located in the eastern part of the Iberian Peninsula in Spain which as in other many Mediterranean basins is currently water-stressed. To guide this work we have used PATRICAL model in combination with AQUATOOL Decision Support System (DSS). The results indicate that for the average year the total use of water in the district amounts to 15,143hm(3)/year, being the Total Water Renewable Water Resources 3909hm(3)/year. On the other hand, the water service costs in Jucar RBD amounts to 1634 million € per year at constant 2012 prices. It is noteworthy that 9% of these costs correspond to non-conventional resources, such as desalinated water, reused water and water transferred from other regions.

  4. Statistical prediction of seasonal discharge in the Naryn basin for water resources planning in Central Asia

    Science.gov (United States)

    Apel, Heiko; Gafurov, Abror; Gerlitz, Lars; Unger-Shayesteh, Katy; Vorogushyn, Sergiy; Merkushkin, Aleksandr; Merz, Bruno

    2016-04-01

    The semi-arid regions of Central Asia crucially depend on the water resources supplied by the mountainous areas of the Tien-Shan and Pamirs. During the summer months the snow and glacier melt water of the rivers originating in the mountains provides the only water resource available for agricultural production but also for water collection in reservoirs for energy production in winter months. Thus a reliable seasonal forecast of the water resources is crucial for a sustainable management and planning of water resources.. In fact, seasonal forecasts are mandatory tasks of national hydro-meteorological services in the region. Thus this study aims at a statistical forecast of the seasonal water availability, whereas the focus is put on the usage of freely available data in order to facilitate an operational use without data access limitations. The study takes the Naryn basin as a test case, at which outlet the Toktogul reservoir stores the discharge of the Naryn River. As most of the water originates form snow and glacier melt, a statistical forecast model should use data sets that can serve as proxy data for the snow masses and snow water equivalent in late spring, which essentially determines the bulk of the seasonal discharge. CRU climate data describing the precipitation and temperature in the basin during winter and spring was used as base information, which was complemented by MODIS snow cover data processed through ModSnow tool, discharge during the spring and also GRACE gravimetry anomalies. For the construction of linear forecast models monthly as well as multi-monthly means over the period January to April were used to predict the seasonal mean discharge of May-September at the station Uchterek. An automatic model selection was performed in multiple steps, whereas the best models were selected according to several performance measures and their robustness in a leave-one-out cross validation. It could be shown that the seasonal discharge can be predicted with

  5. Rainwater Basin Wetland Management District: Annual narrative report: Calendar year 1989

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual narrative report for Rainwater Basin Wetland Management District outlines accomplishments during the 1989 calendar year. The report begins with a summary...

  6. Water Resources Inventory and Assessment for Kern National Wildlife Refuge and Tulare Basin Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Water Resource Inventory and Assessment report for Kern National Wildlife Refuge and Tulare Basin Wildlife Management Area describes hydrologic information,...

  7. Managing Water Resource Challenges in the Congo River Basin

    Science.gov (United States)

    Aloysius, N. R.

    2015-12-01

    Water resources in the tropical regions are under pressure from human appropriation and climate change. Current understanding of interactions between hydrology and climate in the tropical regions is inadequate. This is particularly true for the Congo River Basin (CRB), which also lacks hydroclimate data. Global climate models (GCM) show limited skills in simulating CRB's climate, and their future projections vary widely. Yet, GCMs provide the most credible scenarios of future climate, based upon which changes in water resources can be predicted with coupled hydrological models. The objectives of my work are to i) elucidate the spatial and temporal variability of water resources by developing a spatially explicit hydrological model suitable for describing key processes and fluxes, ii) evaluate the performance of GCMs in simulating precipitation and temperature and iii) develop a set of climate change scenarios for the basin. In addition, I also quantify the risks and reliabilities in smallholder rain-fed agriculture and demonstrates how available water resources can be utilized to increase crop yields. Key processes and fluxes of CRB's hydrological cycle are amply characterized by the hydrology model. Climate change projections are evaluated using a multi-model ensemble approach under different greenhouse gas emission scenarios. The near-term projections of climate and hydrological fluxes are not affected by emission scenarios. However, towards the mid-21st century, projections are emission scenario dependent. Available freshwater resources are projected to increase in the CRB, except in the semiarid southeast. These increases present new opportunities and challenges for augmenting human appropriation of water resources. By evaluating agricultural water requirements, and timing and availability of precipitation, I challenge the conventional wisdom that low agriculture productivities in the CRB are primarily attributable to nutrient limitation. Results show that

  8. Information System for Land-Use Planning and Management

    Institute of Scientific and Technical Information of China (English)

    YU Xiao; MIAO Fang

    2008-01-01

    In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM+ and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.

  9. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  10. Nevada Experiments and Operations Program (N Program) Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  11. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  12. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmon recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.

  13. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-03-08

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of...

  14. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-05-11

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Prepare a Water Resources Management Plan/ Environmental Impact Statement for Mojave National Preserve... to inform preparation of a Water Resources Management Plan/Environmental Impact Statement...

  15. Geothermal reservoir engineering management program plan (GREMP Plan)

    Energy Technology Data Exchange (ETDEWEB)

    1977-10-01

    A plan was formulated for development of the geothermal resources of the United States. Six major elements were identified to make up the research program structure. These are: properties of materials; definition of reservoir characteristics; description of example reservoirs; modeling the behavior of geothermal systems; exploitation strategies; and economics. The six elements yield twelve research categories and fifty research projects. These are discussed in detail in Appendix A and summarized in a table. (JGB)

  16. River Basin Management Plans for analysis within Waterpraxis

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Viuf Ørby, Pia; Nielsen, Helle Ørsted;

    Rapporten opstiller kriterier for udvælgelse af vanddistrikter til analyse i Waterpraxis WP3, og gør rede for disse kriterier for de valgte vanddistrikter i landene omkring Østersøen......Rapporten opstiller kriterier for udvælgelse af vanddistrikter til analyse i Waterpraxis WP3, og gør rede for disse kriterier for de valgte vanddistrikter i landene omkring Østersøen...

  17. Managing Uncertainty: Thinking and Planning Strategically.

    Science.gov (United States)

    Lorenzo, Albert L.

    1993-01-01

    Argues that rapid change and tight resources demand reality-based planning, rather than planning models that ignore internal and external customers or emphasize process over product. Describes the Strategic Guidance Model (SGM) which provides colleges with strategic visioning, organizational assessment, environmental scanning, quality improvement,…

  18. Artificial Post mining lakes - a challenge for the integration in natural hydrography and river basin management

    Science.gov (United States)

    Fleischhammel, Petra; Schoenheinz, Dagmar; Grünewald, Uwe

    2010-05-01

    In terms of the European Water Framework Directive (WFD), post mining lakes are artificial water bodies (AWB). The sustainable integration of post mining lakes in the groundwater and surface water landscape and their consideration in river basin management plans have to be linked with various (geo)hydrological, hydro(geo)chemical, technological and socioeconomic issues. The Lower Lusatian lignite mining district in eastern Germany is part of the major river basins of river Elbe and river Oder. Regionally, the mining area is situated in the sub-basins of river Spree and Schwarze Elster. After the cessation of mining activities and thereby of the artificially created groundwater drawdown in numerous mining pits, a large number of post mining lakes are evolving as consequence of natural groundwater table recovery. The lakes' designated uses vary from water reservoirs to landscape, recreation or fish farming lakes. Groundwater raise is not only substantial for the lake filling, but also for the area rehabilitation and a largely self regulated water balance in post mining landscapes. Since the groundwater flow through soil and dump sites being affected by the former mining activities, groundwater experiences various changes in its hydrochemical properties as e.g. mineralization and acidification. Consequently, downstream located groundwater fed running and standing water bodies will be affected too. Respective the European Water Framework Directive, artificial post mining lakes are not allowed to cause significant adverse impacts on the good ecological status/potential of downstream groundwater and surface water bodies. The high sulphate concentrations of groundwater fed mining lakes which reach partly more than 1,000 mg/l are e.g. damaging concrete constructures in downstream water bodies thereby representing threats for hydraulic facilities and drinking water supply. Due to small amounts of nutrients, the lakes are characterised by oligo¬trophic to slightly

  19. Groundwater quality assessment/corrective action feasibility plan. Savannah River Laboratory Seepage Basins

    Energy Technology Data Exchange (ETDEWEB)

    Stejskal, G.F.

    1989-11-15

    The Savannah River Laboratory (SRL) Seepage Basins are located in the northeastern section of the 700 Area at the Savannah River Site. Currently the four basins are out of service and are awaiting closure in accordance with the Consent Decree settled under Civil Act No. 1:85-2583. Groundwater monitoring data from the detection monitoring network around the SRL Basins was recently analyzed using South Carolina Hazardous Waste Management Regulations R.61-79.264.92 methods to determine if groundwater in the immediate vicinity of the SRL Basins had been impacted. Results from the data analysis indicate that the groundwater has been impacted by both volatile organic constituents (VOCs) and inorganic constituents. The VOCs, specifically trichloroethylene and tetrachloroethylene, are currently being addressed under the auspices of the SRS Hazardous Waste Permit Application (Volume III, Section J.6.3). The impacts resulting from elevated levels of inorganic constituent, such as barium, calcium, and zinc in the water table, do not pose a threat to human health and the environment. In order to determine if vertical migration of the inorganic constituents has occurred three detection monitoring wells are proposed for installation in the upper portion of the Congaree Aquifer.

  20. Social Impact Management Plans: Innovation in corporate and public policy

    Energy Technology Data Exchange (ETDEWEB)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.